  1. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  2. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  3. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  4. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  5. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  6. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  7. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  8. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    International Nuclear Information System (INIS)

    Shonder, John A.; Hughes, Patrick; Atkin, Erica

    2006-01-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  9. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  10. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  11. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  12. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  13. Array automated assembly task low cost silicon solar array project. Phase 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Clayton

    1980-12-01

    The initial contract was a Phase II Process Development for a process sequence, but with concentration on two particular process steps: laserscribing and spray-on junction formation. The add-on portion of the contract was to further develop these tasks, to incorporate spray-on of AR Coating and aluminum and to study the application of microwave energy to solar cell fabrication. The overall process cost projection is 97.918 cents/Wp. The major contributor to this excess cost is the module encapsulation materials cost. During the span of this contract the study of microwave application to solar cell fabrication produced the ability to apply this technique to any requirement of 600/sup 0/C or less. Above this temperature, non-uniformity caused the processing to be unreliable. The process sequence is described in detail, and a SAMICS cost analysis for each valid process step studied is presented. A temporary catalog for expense items is included, and engineering specifications for the process steps are given. (WHK)

  14. Final Report for Project titled High Thermal Conductivity Polymer Composites for Low-Cost Heat Exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Thibaud-Erkey, Catherine [United Technologies reserach Center, East Hartford, CT (United States); Alahyari, Abbas [United Technologies reserach Center, East Hartford, CT (United States)

    2016-12-28

    Heat exchangers (HXs) are critical components in a wide range of heat transfer applications, from HVAC (Heating Ventilation and Cooling) to automobiles to manufacturing plants. They require materials capable of transferring heat at high rates while also minimizing thermal expansion over the usage temperature range. Conventionally, metals are used for applications where effective and efficient heat exchange is required, since many metals exhibit thermal conductivity over 100 W/m K. While metal HXs are constantly being improved, they still have some inherent drawbacks due to their metal construction, in particular corrosion. Polymeric material can offer solution to such durability issues and allow designs that cannot be afforded by metal construction either due to complexity or cost. A major drawback of polymeric material is their low thermal conductivity (0.1-0.5? W/mK) that would lead to large system size. Recent improvements in the area of filled polymers have highlighted the possibility to greatly improve the thermal conductivity of polymeric materials while retaining their inherent manufacturing advantage, and have been applied to heat sink applications. Therefore, the objective of this project was to develop a robust review of materials for the manufacturing of industrial and commercial non-metallic heat exchangers. This review consisted of material identification, literature evaluation, as well as empirical and model characterization, resulting in a database of relevant material properties and characteristics to provide guidance for future heat exchanger development.

  15. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  16. Results from the OECD report on international projections of electricity generating costs

    International Nuclear Information System (INIS)

    Paffenbarger, J.A.; Bertel, E.

    1998-01-01

    The International Energy Agency and Nuclear Energy Agency of the OECD have periodically undertaken a joint study on electricity generating costs in OECD Member countries and selected non-Member countries. This paper presents key results from the 1998 update of this study. Experts from 19 countries drawn from electric utility companies and government provided data on capital costs, operating and maintenance costs, and fuel costs from which levelized electricity generating costs (US cents/kWh) for baseload power plants were estimated in each country using a common set of economic assumptions. Light water nuclear power plants, pulverized coal plants, and natural gas-fired combined cycle gas turbines were the principal options evaluated. five and 10% discount rates, 40-year operating lifetime, and 75% annual load factor were the base assumptions, with sensitivity analyses on operating lifetime and load factor. Fuel costs and fuel escalation were provided individually by country, with a sensitivity case to evaluate costs assuming no real fuel price escalation over plant lifetimes. Of the three principal fuel/technology options, none is predominantly the cheapest option for all economic assumptions. However, fossil-fueled options are generally estimated to be the least expensive option. The study confirms that gas-fired combined cycles have improved their economic performance in most countries in recent years and are strong competitors to nuclear and coal-fired plants. Eleven out of the 18 countries with two or more options show gas-fired plants to be the cheapest option at 10% discount rate. Coal remains a strong competitor to gas when lower discount rates are used. Nuclear is the least expensive at both 5 and 10% discount rate in only two countries. Generally, with gas prices above 5 US$/GJ, nuclear plants constructed at overnight capital costs below 1 650 $/kWe have the potential to be competitive only at lower discount rates

  17. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  18. Medicare Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Medicare certified institutional providers are required to submit an annual cost report to a Medicare Administrative Contractor. The cost report contains provider...

  19. The role of technology in reducing health care costs. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Sill, A.E.; Warren, S.; Dillinger, J.D.; Cloer, B.K.

    1997-08-01

    Sandia National Laboratories applied a systems approach to identifying innovative biomedical technologies with the potential to reduce U.S. health care delivery costs while maintaining care quality. This study was conducted by implementing both top-down and bottom-up strategies. The top-down approach used prosperity gaming methodology to identify future health care delivery needs. This effort provided roadmaps for the development and integration of technology to meet perceived care delivery requirements. The bottom-up approach identified and ranked interventional therapies employed in existing care delivery systems for a host of health-related conditions. Economic analysis formed the basis for development of care pathway interaction models for two of the most pervasive, chronic disease/disability conditions: coronary artery disease (CAD) and benign prostatic hypertrophy (BPH). Societal cost-benefit relationships based on these analyses were used to evaluate the effect of emerging technology in these treatment areas. 17 figs., 48 tabs.

  20. Report Project

    International Nuclear Information System (INIS)

    Diédhiou, Ibrahima; Diédhiou, Pape Madiallaké; Ndoye Ndir, Khadidiatou

    2010-01-01

    This report highlights the activities carried out during the last semester (July to December) of 2010 as following: Induced mutagenesis for the genetic improvement of Jatropha curcas. Radiation test For gamma irradiation, the 60Co source was used. Radiosensitivity test was carried out on Jatropha curcas seeds of the variety Bacary Sane that had good germination rate (i.e. >90%). Therefore, 4 replicates of 10 seeds per dose were moisture equilibrated by desiccation with 60% glycerol for at least 3 days. A wide range of doses (0, 100, 200, 300,400, 500 and 600 Gy) were tested. After irradiation, seeds were shelled and pregerminated in Petri dishes at 28 ºC for 48h. A 100 % germination rate was obtained for all treatments. After transplantation into the growth substrate, survival rate as well as hypocotyl length were assessed at 14 days and at 1 month after planting. The survival rate decreased with increasing γ ray dose. A regression line with the equation y = -0.2238x + 106.39 could be drawn, whereby the R2 value reached 0.9489.

  1. Low cost solar array project. Quarterly progress report, January-March, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The engineering design, fabrication, assembly, operation, economic analysis, and process support R and D for an Experimental Process System Development Unit (EPSDU) are presented. The civil construction work was completed and the mechanical bid package is in preparation. The electrical design effort is in progress. Parallel efforts which complement the mechanical design are the process flow diagrams and control instrumentation logic for startup operation and shutdown. These are in progress and will identify all process and utility streams, control systems, and flow logic. The data collection system takes the signals from the instrumentation, translates them into engineering units and finally develops a data report which summarizes all key performance parameters. Cleaning procedures have been established to assure a contamination-free product and inspection visits have been made to the fabricators of specialty equipment.

  2. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  3. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  4. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  5. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  6. SMART 3D SUBSURFACE CONTAMINANT CHARACTERIZATION AT THE BGRR DECOMMISSIONING PROJECT. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT

    International Nuclear Information System (INIS)

    HEISER, J.; KALB, P.; SULLIVAN, T.; MILIAN, L.

    2001-01-01

    The Brookhaven Graphite Research Reactor (BGRR), which operated from 1951--1968 is currently undergoing decontamination and decommissioning (D and D). As part of this effort, many of the major structures and facilities (e.g., Above Grade Ducts, Cooling Fans, Pile Fan Sump, Transfer Canal and Instruments Houses) are being removed to eliminate contaminants and reduce the footprint of the overall facility. However, a significant cost savings (almost $5M) can potentially be realized if the large concrete Below Grade Ducts (BGD) can be decontaminated and left in place. In order to do this, soils beneath the ducts must be fully characterized to identify areas where contaminants may have leaked, what radioactive and hazardous contaminants remain, and in what concentrations. This information will then be used to evaluate whether discrete areas of localized contaminated soil can be selectively removed or, if the contamination is significant and widespread, and whether the ducts themselves must be removed for complete cleanup. The information generated from this effort is input into the BGRR BGD Characterization Report and an Engineering Evaluation/Cost Analysis (EE/CA) currently being prepared to evaluate potential options for the ducts. This FY01 Department of Energy Accelerated Site Technology Deployment (DOE ASTD) project combined a suite of innovative technologies to provide cost-effective characterization of the soils beneath the BGD and present the data in an easily understandable three-dimensional representation of the contaminant concentrations beneath the ducts. Conventional characterization of the soil would have required sampling a very large area in a tight grid pattern to ensure that all areas of potential contamination were evaluated. It is estimated that using baseline techniques would require approximately 2500 samples (costing ∼$1.6M), depending on the level of precision required by regulators. This massive amount of data would then be difficult to

  7. The cost and performance of utility commercial lighting programs. A report from the Database on Energy Efficiency Programs (DEEP) project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, J.; Vine, E.; Shown, L.; Sonnenblick, R.; Payne, C. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.

    1994-05-01

    The objective of the Database on Energy Efficiency Programs (DEEP) is to document the measured cost and performance of utility-sponsored, energy-efficiency, demand-side management (DSM) programs. Consistent documentation of DSM programs is a challenging goal because of problems with data consistency, evaluation methodologies, and data reporting formats that continue to limit the usefulness and comparability of individual program results. This first DEEP report investigates the results of 20 recent commercial lighting DSM programs. The report, unlike previous reports of its kind, compares the DSM definitions and methodologies that each utility uses to compute costs and energy savings and then makes adjustments to standardize reported program results. All 20 programs were judged cost-effective when compared to avoided costs in their local areas. At an average cost of 3.9{cents}/kWh, however, utility-sponsored energy efficiency programs are not ``too cheap to meter.`` While it is generally agreed upon that utilities must take active measures to minimize the costs and rate impacts of DSM programs, the authors believe that these activities will be facilitated by industry adoption of standard definitions and reporting formats, so that the best program designs can be readily identified and adopted.

  8. Monthly Program Cost Report (MPCR)

    Data.gov (United States)

    Department of Veterans Affairs — The Monthly Program Cost Report (MPCR) replaces the Cost Distribution Report (CDR). The MPCR provides summary information about Veterans Affairs operational costs,...

  9. Health Clinic Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Healthcare Cost Report Information System (HCRIS) Dataset - Independent Rural Health Clinic and Freestanding Federally Qualified Health Center (HCLINIC).This data...

  10. 14 CFR 151.41 - Project costs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...

  11. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  12. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  13. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  14. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  15. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  16. Unicycle Project Report

    OpenAIRE

    Thomson, S

    2010-01-01

    The Unicycle project implemented an institutional Open Educational Resource repository with a view to ensuring sustainability in approach by embedding OER as an Assessment, Learning and Teaching strategy. This is the final submitted report for the project.

  17. Abbreviated report of the critical analysis of the spent nuclear fuel project's activity-based cost estimate

    International Nuclear Information System (INIS)

    Warren, R.N.

    1998-01-01

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI's review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI's review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI's scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES

  18. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  19. Historical and projected costs of natural disasters

    Energy Technology Data Exchange (ETDEWEB)

    Engi, D.

    1995-04-01

    Natural disasters cause billions of dollars of damage and thousands Of deaths globally each year. While the magnitude is clear, the exact costs (in damage and fatalities) are difficult to clearly identify. This document reports on the results of a survey of data on the costs associated with significant natural disasters. There is an impressive amount of work and effort going into natural disaster research, mitigation, and relief. However, despite this effort, there are surprisingly few consistent and reliable data available regarding the effects of natural disasters. Even lacking consistent and complete data, it is clear that the damage and fatalities from natural disasters are increasing, both in the United States, and globally. Projections using the available data suggest that, in the United States alone, the costs of natural disasters between 1995 and 2010 will be in the range of $90 billion (94$) and 5000 lives.

  20. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  1. Project SERAPHIM Report.

    Science.gov (United States)

    Moore, John W.

    1983-01-01

    Lists and briefly describes computer programs recently added to those currently available from Project SERAPHIM. Program name, subject, hardware, author, supplier, and cost are provided in separate listings for Apple, PET, TRS-80 I or III, IBM, VIC-20, TERAK, and PDP-11 microcomputers. Includes corrections for two current Apple programs. (JN)

  2. Drilling for improvement : Statoil and Halliburton report significant cost savings and more accurate well placement at the Leismer demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2010-07-15

    This article discussed new improvements in steam assisted gravity drainage (SAGD) made by Statoil and Halliburton at the Leismer demonstration project. The Leismer project is Statoil's inaugural project in oil sands development, and will have a capacity to produce 10,000 barrels per day through 4 separate well pads with 23 well pairs. Challenges to the project included the long lateral sections required for the well pairs to remain parallel to each other while remaining within the target formation. An azimuthal deep resistivity (ADR) tool was used to detect the proximity of the wellbore to shale and water zones. Use of the tool allowed operators to modify the planned well trajectory in order to optimize placements within the reservoir. A rotary steerable system (RSS) was used increase injection times. The project was completed 6 to 8 weeks ahead of schedule. Applications have now been filed for a further 10 phases that will produce 240,000 barrels per day. 1 fig.

  3. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  4. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  5. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  6. Residential photovoltaic module and array requirement study. Low-Cost Solar Array Project engineering area. Final report appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    This volume contains the appendices to a study to identify design requirements for photovoltaic modules and arrays used in residential applications. Appendices include: (1) codes, standards, and manuals of accepted practice-definition and importance; (2) regional code variations-impact; (3) model and city codes-review; (4) National Electric Code (NEC)-review; (5) types of standards-definition and importance; (6) federal standards-review; (7) standards review method; (8) manuals of accepted practice; (9) codes and referenced standards-summary; (10) public safety testing laboratories; (11) insurance review; (12) studies approach; (13) mounting configurations; (14) module/panel size and shape cost analysis; (15) grounding, wiring, terminal and voltage studies; (16) array installation cost summary; (17) photovoltaic shingle/module comparison; (18) retrofit application; (19) residential photovoltaic module performance criteria; (20) critique of JPL's solar cell module design and test specifications for residential applications; and (21) CSI format specification. (WHK)

  7. Final Project Report

    DEFF Research Database (Denmark)

    Duer, Karsten

    1997-01-01

    The report summarizes the work that has been carried out within the project "B1 AEROGELS" as a part of the IEA SH&CP Task 18 "Advanced Glazing and Associated Materials For SolarAnd Building Applications". By providing at the same time thermal insulation and transparency the silica aerogel is a very...

  8. Healthcare Cost and Utilization Project (HCUP)

    Science.gov (United States)

    The Healthcare Cost and Utilization Project is a family of health care databases and related software tools and products developed through a Federal-State-Industry partnership and sponsored by the Agency for Healthcare Research and Quality.

  9. Final Report: Hydrogen Storage System Cost Analysis

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); Houchins, Cassidy [Strategic Analysis Inc., Arlington, VA (United States); Huya-Kouadio, Jennie Moton [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel A. [Strategic Analysis Inc., Arlington, VA (United States)

    2016-09-30

    The Fuel Cell Technologies Office (FCTO) has identified hydrogen storage as a key enabling technology for advancing hydrogen and fuel cell power technologies in transportation, stationary, and portable applications. Consequently, FCTO has established targets to chart the progress of developing and demonstrating viable hydrogen storage technologies for transportation and stationary applications. This cost assessment project supports the overall FCTO goals by identifying the current technology system components, performance levels, and manufacturing/assembly techniques most likely to lead to the lowest system storage cost. Furthermore, the project forecasts the cost of these systems at a variety of annual manufacturing rates to allow comparison to the overall 2017 and “Ultimate” DOE cost targets. The cost breakdown of the system components and manufacturing steps can then be used to guide future research and development (R&D) decisions. The project was led by Strategic Analysis Inc. (SA) and aided by Rajesh Ahluwalia and Thanh Hua from Argonne National Laboratory (ANL) and Lin Simpson at the National Renewable Energy Laboratory (NREL). Since SA coordinated the project activities of all three organizations, this report includes a technical description of all project activity. This report represents a summary of contract activities and findings under SA’s five year contract to the US Department of Energy (Award No. DE-EE0005253) and constitutes the “Final Scientific Report” deliverable. Project publications and presentations are listed in the Appendix.

  10. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  11. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  12. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  13. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Science.gov (United States)

    2010-01-01

    ... Agency's satisfaction before the application will be approved. The applicant must submit the original... to bioenergy projects, which are, as defined in § 4280.103, renewable energy systems that produce... requirements and obtaining those agreements. This is required even if the system is installed on the customer...

  14. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  15. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  16. Research on the Investment Costs of IT Project

    Science.gov (United States)

    Zurong, Chen; Feng, Jingchun

    2018-02-01

    The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.

  17. Final Project Report for DOE/EERE High-Capacity and Low-Cost Hydrogen-Storage Sorbents for Automotive Applications

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Hong-Cai [Texas A & M Univ., College Station, TX (United States); Liu, Di-Jia [Texas A & M Univ., College Station, TX (United States)

    2017-12-01

    This report provides a review of the objectives, progress, and milestones of the research conducted during this project on the topic of developing innovative metal-organic frameworks (MOFs) and porous organic polymers (POPs) for high-capacity and low-cost hydrogen-storage sorbents in automotive applications.1 The objectives of the proposed research were to develop new materials as next-generation hydrogen storage sorbents that meet or exceed DOE’s 2017 performance targets of gravimetric capacity of 0.055 kg H2/kgsystem and volumetric capacity of 0.040 kg H2/Lsystem at a cost of $400/kg H2 stored. Texas A&M University (TAMU) and Argonne National Laboratory (ANL) collaborated in developing low-cost and high-capacity hydrogen-storage sorbents with appropriate stability, sorption kinetics, and thermal conductivity. The research scope and methods developed to achieve the project’s goals include the following: Advanced ligand design and synthesis to construct MOF sorbents with optimal hydrogen storage capacities, low cost and high stability; Substantially improve the hydrogen uptake capacity and chemical stability of MOF-based sorbents by incorporating high valent metal ions during synthesis or through the post-synthetic metal metathesis oxidation approach; Enhance sorbent storage capacity through material engineering and characterization; Generate a better understanding of the H2-sorbent interaction through advanced characterization and simulation. Over the course of the project 5 different MOFs were developed and studied: PCN-250, PCN-12, PCN-12’, PCN-608 and PCN-609.2-3 Two different samples were submitted to the National Renewable Energy Laboratory (NREL) in order to validate their hydrogen adsorption capacity, PCN-250 and PCN-12. Neither of these samples reached the project’s Go/No-Go requirements but the data obtained did further prove the hypothesis that the presence of open metal

  18. Low Cost Solar Array Project. Feasibility of the silane process for producing semiconductor-grade silicon. Final report, October 1975-March 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The commercial production of low-cost semiconductor-grade silicon is an essential requirement of the JPL/DOE (Department of Energy) Low-Cost Solar Array (LSA) Project. A 1000-metric-ton-per-year commercial facility using the Union Carbide Silane Process will produce molten silicon for an estimated price of $7.56/kg (1975 dollars, private financing), meeting the DOE goal of less than $10/kg. Conclusions and technology status are reported for both contract phases, which had the following objectives: (1) establish the feasibility of Union Carbide's Silane Process for commercial application, and (2) develop an integrated process design for an Experimental Process System Development Unit (EPSDU) and a commercial facility, and estimate the corresponding commercial plant economic performance. To assemble the facility design, the following work was performed: (a) collection of Union Carbide's applicable background technology; (b) design, assembly, and operation of a small integrated silane-producing Process Development Unit (PDU); (c) analysis, testing, and comparison of two high-temperature methods for converting pure silane to silicon metal; and (d) determination of chemical reaction equilibria and kinetics, and vapor-liquid equilibria for chlorosilanes.

  19. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  20. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  1. Project radon final report

    International Nuclear Information System (INIS)

    Ekholm, S.; Rossby, U.

    1990-01-01

    The main radiation problem in Sweden is due to radon in dwellings. At the Swedish State Power Board, R, D and D about radon has been going on since 1980. The work has concentrated on the important questions: How to find building with enhanced radon levels?; How to accurately decide on measures that will give adequate cleaning-up results, using appropriate measurement procedures; What cleaning-up effect is possible to achieve with an electro-filter?; and What cleaning-up effects are possible to achieve with different types of ventilation systems? The R, D and D-work, has been pursued in cooperation with universities of technology in Denmark and Finland, equipment manufacturers, consultants and authorities concerned. It was decided in December 1986 to give an offer to some SSPB-employees to investigate the radon situation of their dwellings, in order to test methods of measurement and cleaning-up under realistic conditions and to develop the methods to commercial maturity. The investigation was named 'Project Radon' and was carried out in three years with costs amounting to 1 M dollars. During the project less comprehensive radon measurements, named 'trace-measurements' were undertaken in about 1300 dwellings and more elaborate measurements, leading to suggestions of actions to be taken, in about 400 dwellings. Out of the suggestions, about 50 are carried out including control measurement after actions taken. The control measurement have shown that the ability to suggest appropriate actions is very successful - in just one case was a minor additional action necessary. The high reliability is achieved by always doing elaborate measurements before suggested mitigation method is decided on. (authors)

  2. Project feasibility and mine production costs

    Energy Technology Data Exchange (ETDEWEB)

    Longworth, C R

    1987-01-01

    The paper outlines the present investment environment existing in the Australian Coal Industry and places this in the context of the current world seaborne coal trade. Those factors which have the greatest influence on the viability of coal projects today, namely coal prices and quality, exchange rates, cash cost of production, capital and borrowing costs, infrastructure and government charges are dealt with briefly. The paper concludes by giving a schedule of those factors of a local character which can be changed to render projects more competitive and also presents some external factors beyond Australia's control which will, in part, influence the development of the industry in the next decade. 4 refs., 8 figs.

  3. Sharing the cost of risky projects

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moulin, Hervé

    2018-01-01

    Users share the cost of unreliable non-rival projects (items). For instance, industry partners pay today for R&D that may or may not deliver a cure to some viruses, agents pay for the edges of a network that will cover their connectivity needs, but the edges may fail, etc. Each user has a binary...

  4. IRRSUD Project - Final report

    CERN Document Server

    Loyer, F

    2002-01-01

    IRRSUD is an irradiation facility which makes use of the low energy (0.5 MeV/n - 1 MeV/n) beams from the GANIL IRRSUD injectors. It is financed by the group GARI (Group of Ion Research Applications) and was established as a joint-venture of GANIL and CIRIL to develop the applied physics and ion based industrial applications. Among research directions framed by IRRSUD one can mention; the nano-technologies i.e. utilisation of the modifications induced in materials exposed to ion bombardment; realization of microporous membranes and low-D materials; aging of materials by irradiation. Also, the low energy ions issued from the injector matches very well the fission fragments in reactors. In addition IRRSUD could be used as testing facility for injectors.. The report is structured as follows: 1. Outline; 1.2. Project's main features; 1.3. Ion beam characterization; 2. Technical solutions; 2.1. Denominations; 2.2. Beam optics; 2.3. Beam bending magnets; 2.4. Beam instrumentation; 2.5. Current supply; 2.6. Vacuum sy...

  5. Fabrication of large-volume, low-cost ceramic lanthanum halide scintillators for gamma ray detection : final report for DHS/DNDO/TRDD project TA-01-SL01.

    Energy Technology Data Exchange (ETDEWEB)

    Boyle, Timothy J.; Ottley, Leigh Anna M.; Yang, Pin; Chen, Ching-Fong; Sanchez, Margaret R.; Bell, Nelson Simmons

    2008-10-01

    This project uses advanced ceramic processes to fabricate large, optical-quality, polycrystalline lanthanum halide scintillators to replace small single crystals produced by the conventional Bridgman growth method. The new approach not only removes the size constraint imposed by the growth method, but also offers the potential advantages of both reducing manufacturing cost and increasing production rate. The project goal is to fabricate dense lanthanum halide ceramics with a preferred crystal orientation by applying texture engineering and solid-state conversion to reduce the thermal mechanical stress in the ceramic and minimize scintillation light scattering at grain boundaries. Ultimately, this method could deliver the sought-after high sensitivity and <3% energy resolution at 662 keV of lanthanum halide scintillators and unleash their full potential for advanced gamma ray detection, enabling rapid identification of radioactive materials in a variety of practical applications. This report documents processing details from powder synthesis, seed particle growth, to final densification and texture development of cerium doped lanthanum bromide (LaBr{sub 3}:Ce{sup +3}) ceramics. This investigation demonstrated that: (1) A rapid, flexible, cost efficient synthesis method of anhydrous lanthanum halides and their solid solutions was developed. Several batches of ultrafine LaBr{sub 3}:Ce{sup +3} powder, free of oxyhalide, were produced by a rigorously controlled process. (2) Micron size ({approx} 5 {micro}m), platelet shape LaBr{sub 3} seed particles of high purity can be synthesized by a vapor phase transport process. (3) High aspect-ratio seed particles can be effectively aligned in the shear direction in the ceramic matrix, using a rotational shear-forming process. (4) Small size, highly translucent LaBr{sub 3} (0.25-inch diameter, 0.08-inch thick) samples were successfully fabricated by the equal channel angular consolidation process. (5) Large size, high density

  6. The Problem with the Delta Cost Project Database

    Science.gov (United States)

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  7. Supplemental report on cost estimates'

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis

  8. Cost Reporting at a Navy Branch Clinic

    Science.gov (United States)

    1993-03-01

    John Wiley & Sons, 1991. 15 Horngren , Charles, Cost Accounting -=A Managerial Emphasis, 5th Edition, Prentice Hall, Inc., Englewood Cliffs, N.J., 1982...traditionally reported under a partial cost reporting system. By applying basic principles of managerial accounting , a full cost reporting system is...traditionally reported under a partial cost reporting system. By applying basic principles of managerial accounting , a proposed full cost reporting

  9. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  10. 10 CFR 611.102 - Eligible project costs.

    Science.gov (United States)

    2010-01-01

    ... Accounting Principles and these costs may be considered by DOE in determining the Borrower's contribution to... 10 Energy 4 2010-01-01 2010-01-01 false Eligible project costs. 611.102 Section 611.102 Energy... PROGRAM Direct Loan Program § 611.102 Eligible project costs. (a) Eligible costs are: (1) Those costs that...

  11. Final Year Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Hubsch, Tristan [Howard University

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  12. ACCESS Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Weller, Heiko [Robert Bosch, LLC, Farmington Hills, MI (United States)

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  13. Costing Future Complex and Novel Projects

    Science.gov (United States)

    2016-04-30

    Defence Science and Technology Laboratory (DSTL) is reported. The work involves pioneering data collection, analysis, and tool development to support... philosophy of the work and future prospects for its wider application. Summary The United Kingdom National Audit Office Major Projects Report 2014 states...the work will be in tackling variety in the data collected, one of the “3 Vs ” of Big Data. The outline programme is shown in Figure 2. Programme

  14. Projected costs of generating electricity - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies, including coal and gas (with and without carbon capture), nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal as well as combined heat and power (CHP). It provides levelised costs of electricity (LCOE) per MWh for almost 200 plants, based on data covering 21 countries (including four major non-OECD countries), and several industrial companies and organisations. For the first time, the report contains an extensive sensitivity analysis of the impact of variations in key parameters such as discount rates, fuel prices and carbon costs on LCOE. Additional issues affecting power generation choices are also examined. The study shows that the cost competitiveness of electricity generating technologies depends on a number of factors which may vary nationally and regionally. Readers will find full details and analyses, supported by over 130 figures and tables, in this report which is expected to constitute a valuable tool for decision makers and researchers concerned with energy policies and climate change

  15. Subject Access Project. Third Quarterly Report.

    Science.gov (United States)

    Atherton, Pauline

    This third quarterly report for the period January to March 1977 describes the production schedule, records, and estimated costs and times in creating the Subject Access Project data base. Plans for on-line use of the data base and search strategy design are outlined. A table of specifications for preparing the data base for on-line searching is…

  16. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Small, R. Justin [Woods Hole Oceanographic Institution, MA (United States); Bryan, Frank [Woods Hole Oceanographic Institution, MA (United States); Tribbia, Joseph [Woods Hole Oceanographic Institution, MA (United States); Park, Sungsu [Woods Hole Oceanographic Institution, MA (United States); Dennis, John [Woods Hole Oceanographic Institution, MA (United States); Saravanan, R. [Woods Hole Oceanographic Institution, MA (United States); Schneider, Niklas [Woods Hole Oceanographic Institution, MA (United States); Kwon, Young-Oh [Woods Hole Oceanographic Institution, MA (United States)

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  17. Final Project Report

    DEFF Research Database (Denmark)

    Workspace

    2003-01-01

    of the Disappearing Computer to be that of  “Augmenting reality”, where “Augmented reality” meant:  •  Augmented user – positioning, visualising. •  Augmented environment, Panels, tables and site-pack •  Augmented Artifacts - RFID , tagging, tracking •  Augmented communications – efficient exchange and integration......The primary focus of the WORKSPACE project was to augment the working  environment through the development of spatial computing components, initially for  members of the design professions, but with wider applicability to a range of work  domains.     The project interpreted the requirements...... of the above.    The philosophy was to make the computer disappear by both making it large and  embedding it into the environment (e.g. furniture).  The project has successfully achieved its objectives, and has developed a range of  demonstrator prototypes, some of which is in daily use by practitioners within...

  18. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  19. Final report: Compiled MPI. Cost-Effective Exascale Application Development

    Energy Technology Data Exchange (ETDEWEB)

    Gropp, William Douglas [Univ. of Illinois, Urbana-Champaign, IL (United States)

    2015-12-21

    This is the final report on Compiled MPI: Cost-Effective Exascale Application Development, and summarizes the results under this project. The project investigated runtime enviroments that improve the performance of MPI (Message-Passing Interface) programs; work at Illinois in the last period of this project looked at optimizing data access optimizations expressed with MPI datatypes.

  20. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  1. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  2. Novalignin project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stigsson, Lars [KIRAM AB, Saltsjoebaden (Sweden)

    2002-02-01

    The NovaFiber process is a new and sustainable technology for manufacturing of chemical pulp incorporating an efficient route for recovery of energy and pulping chemicals. The process is substantially sulphur chemicals free and this creates a great potential for recovery of sulphur free lignin for internal use as a fuel or export from the mill. The NovaLignin project has been launched to evaluate this potential from a technical and economical perspective. The NovaLignin research and development effort has been partly financed by NUTEK, Energimyndigheten and Mistra. A major feature of the new lignin is the absence of organically bound sulphur compounds in the material increasing the scope of potential uses for the lignin as a precursor for fine chemicals preparation or as a sulphur free biomass based fuel. Two major forest industry laboratories in Scandinavia have conducted the laboratory cooking and lignin extraction work in the present project. The lignin extracted from the NovaFiber process, NovaLignin, has been characterised and evaluated for use in different applications. The consequences of lignin extraction in different mill configurations with a recovery boiler or a black liquor gasification system for chemicals recovery is outlined below. The NovaFiber pulp mill is compared to a reference mill based on conventional kraft pulping on the same wood raw material. The mill capacity is 2000 t/d bleached softwood pulp. The lime kiln is fired with bark and the remaining falling bark is sold, or if there is a deficit, more bark is purchased. Initial laboratory studies conducted at ATO-DLO, the Netherlands, clearly show a great potential for NovaLignin as a functional additive in thermoplastics. NovaFiber and Kraft lignin act as an UV stabiliser for polyethylene at a comparable level as an expensive commercial stabiliser, such as HALS. This means that NovaFiber lignin has a very good price/performance ratio. Experiments show that NovaFiber lignin has good potential

  3. Summer Project Report

    CERN Document Server

    Islam, Wasikul

    2015-01-01

    In this project we mainly prepared and classified several materials, important links for understanding accelerators for different age group. Accelarators now-a-days are very much important tool for not only particle physics laboratories but also for the common people for its extended applications. So, it is very much important to make people know the basics of accelerators, its basic principles, objectives and different varieties. As different age group of people have different level of understandings, so it was necessary to develop materials differently for categories based on age group. Hence, for three different categories we have separately prepared different presentations and collected important all the useful weblinks, videos, animations, games etc. related to accelerators and put them to our new webpage : https://twiki.cern.ch/twiki/bin/view/Main/Material

  4. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  5. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  6. Projected costs of generating electricity - 2005 update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut 'winner'. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. 24 figs., 38 tabs., 11 apps.

  7. Skyhook project: progress report

    International Nuclear Information System (INIS)

    Ainsworth, E.J.; Prioleau, J.C.; Mahlmann, L.J.

    1986-01-01

    The authors have initiated two types of animal experiments to complement and extend the existing data base comparing low- and high-LET radiations, and the studies utilize the Harderian gland model and range-finding or pilot studies on life-span shortening after exposure to heavy charged particles characterized by different LETs. Results from the animal studies have yielded new information concerning relationships between LET and carcinogenic effects and the animal studies are of themselves complementary. The Harderian gland model yields information on in-vivo transformation under conditions of tumor promotion that result from excess pituitary hormones, while the life-span studies, involving no extraneous promotion, indicate interactions between tumor induction and expression. Comparison of tumorigenic results on the Harderian gland and life shortening responses are expected to be highly informative. The purpose of the Skyhook Project was to test the hypothesis that LET was an adequate predictor for life shortening and that low-energy charged particles characterized by a LET approximately the same as that for fission neutrons would produce quantitatively similar life-shortening results after single or multifractionated doses. Another purpose was to evaluate life shortening, using comparatively high doses, over a LET range from less than 1 to approximately 200 keV/μm

  8. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Jin [University of California Santa Cruz; Zhao, Yiping [University of Georgia at Athens

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  9. Summer Student Project Report

    CERN Document Server

    Cai, Yiming

    2014-01-01

    In order to know the influence of penguin contribution to the measurement of CP violation phase in Bs to J/Psi phi. We need to measure it in Bs to J/Psi Kst. And we also need to know the ratio of these two branch ratios. To get the branch ratio of Bs to J/Psi phi, we use the data of Bs to J/Psi KK and correct it by a p-wave/s-wave factor. This report shows the results of this p-wave/s-wave correction ratio.

  10. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  11. Severn Barrage project. Detailed report - V. 5

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    Prior to the present programme of work, the effects which a tidal power barrage would have on the region, during both construction and operation, had not been studied in detail. This volume of the Detailed Report therefore represents a significant extension of work into these aspects of the Severn Barrage Project. In the Regional Study, a number of benefits have been identified, some of which may represent net benefits nationally. The economic assessment of both regional and national benefits and costs is presented. The second part of this volume reports on the work done on the Legal Background for the Project. (author).

  12. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  13. Dehydration project report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-31

    Catalytic Industrial Group became interested in the ability to use its catalytic infrared technology for the removal of moisture in substances after having had very positive experience in removing moisture from water-based coatings which are becoming increasingly popular as industry strives to comply with clean air mandates. The first attempts were crude but showed that the moisture could be removed, and intriguing enough that they started to think about a conveying-based system that would remove moisture from products. The initial tests were designed around sawdust. The authors felt that the market in particleboard and in the MDF board by itself justified the research into this concept. The Kansas Department of Health and Environment has been kept apprised of the on-going development of the infrared drying system by Catalytic Industrial Group. There were some early delays in the delivery of equipment needed to build the prototype machine. The design changes identified during the experimental phase of the development of the infrared dryer have been resolved and a process-testing device has been developed. This technical report outlines the progress made to date.

  14. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  15. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  16. Array Automated Assembly Task Low Cost Silicon Solar Array Project. Phase 2. Annual technical report, September 20, 1977-December 31, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Rhee, Sang S.; Jones, Gregory T.; Allison, Kimberly L.

    1978-01-01

    This program was conducted to develop and demonstrate those solar cells and module process steps which have the technological readiness or capability to achieve the 1986 LSA goals. Results are reported. Seventeen process groups were investigated. Very promising results were achieved. A laserscribe computer program was developed. It demonstrated that silicon solar cells could be trimmed and holed by laser without causing mechanical defects (i.e., microcracks) nor any major degradation in solar cell electrical performance. The silicon wafer surface preparation task demonstrated a low-cost, high throughput texturizing process readily adaptable to automation. Performance verification tests of a laser scanning system showed a limited capability to detect hidden cracks or defects in solar cells. A general review of currently available thick film printing equipment provided the indication that state-of-the-art technology can adequately transform the capability of current printing machines to the elevated rate of 7200 wafers per hour. The LFE System 8000 silicon nitride plasma deposition system with the inclusion of minor equipment modifications was shown to be consistent with the 1986 LSA pricing goals. The performance verification test of the silicon nitride A.R. coating process provided the result that texturized, A.R. coated solar cells display a 14.1% improvement in electrical performance over identical solar cells without an A.R. coating. A new electroless nickel plating system was installed and demonstrated a low-cost, high throughput process readily adaptable to automation. A multiple wafer dipping method was investigated and operational parameters defined. A flux removal method consisting of a three stage D.I. water cascade rinse system with ultrasonic agitator was found to be very promising. Also, a SAMICS cost analysis was performed. (WHK)

  17. Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design, demand and fuel projections and cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-08

    The Phase I Report, Grid ICES, presented the broad alternatives and implications for development of an energy system satisfying thermal demand with the co-generation of electric power, all predicated on the use of solid fuels. Participants of the system are the University of Minnesota, operator and primary thermal user, and Northern States Power Company, primary electrical user; with St. Mary's Hospital, Fairview Hospital, and Augsburg College as Add-on Customers for the thermal service (Option I). Included for consideration are the Options of (II) solid waste disposal by the Pyrolysis Method, with heat recovery, and (III) conversion of a portion of the thermal system from steam to hot water distribution to increase co-generation capability and as a demonstration system for future expansion. This report presents the conceptual design of the energy system and each Option, with the economic implications identified so that selection of the final system can be made. Draft outline of the Environmental Assessment for the project is submitted as a separate report.

  18. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  19. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  20. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  1. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  2. Cost comparison for REDC pretreatment project

    International Nuclear Information System (INIS)

    Robinson, S.M.; Homan, F.J.

    1997-06-01

    This analysis has been prepared to support the planned expenditure to provide the Radiochemical Engineering Development Center (REDC) with the capability to pretreat their liquid low-level waste (LLLW) before discharging it to the Oak Ridge National Laboratory (ORNL) LLLW system. Pretreatment will remove most of the radioactivity, particularly the transuranic isotopes and Cs-137 from the waste to be discharged. This will render the supernates that accumulate in the storage tanks low-activity Class B low-level wastes rather than high-activity Class B or Class C wastes. The sludges will be Class C rather than remote-handled transuranic (RH-TRU) wastes. When REDC wastes are commingled with other ORNL LLLW, the present-worth treatment and transport costs are higher by a factor of 1.3 for the no-pretreatment cases. This result is consistent with data from similar studies conducted at other sites. Based on the information presented in this analysis, the recommendation is to proceed with REDC treatment projects

  3. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  4. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  5. Cost Benefit Studies. Final Report.

    Science.gov (United States)

    Weiner, Arthur; Marson, Arthur A.

    This document applies Dr. Mehar Aurora's method for conducting cost benefit studies to the Food Manufacturing Technology-Dairy and the Food Manufacturing Technology-Canning and Freezing programs offered by the Moraine Park Technical Institute. Costs to individual students enrolled in the programs include tuition, fees, housing, travel, books,…

  6. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  7. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  8. The cost of wetland creation and restoration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    King, D.; Bohlen, C.

    1995-08-01

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  9. Fusion Simulation Project Workshop Report

    Science.gov (United States)

    Kritz, Arnold; Keyes, David

    2009-03-01

    The mission of the Fusion Simulation Project is to develop a predictive capability for the integrated modeling of magnetically confined plasmas. This FSP report adds to the previous activities that defined an approach to integrated modeling in magnetic fusion. These previous activities included a Fusion Energy Sciences Advisory Committee panel that was charged to study integrated simulation in 2002. The report of that panel [Journal of Fusion Energy 20, 135 (2001)] recommended the prompt initiation of a Fusion Simulation Project. In 2003, the Office of Fusion Energy Sciences formed a steering committee that developed a project vision, roadmap, and governance concepts [Journal of Fusion Energy 23, 1 (2004)]. The current FSP planning effort involved 46 physicists, applied mathematicians and computer scientists, from 21 institutions, formed into four panels and a coordinating committee. These panels were constituted to consider: Status of Physics Components, Required Computational and Applied Mathematics Tools, Integration and Management of Code Components, and Project Structure and Management. The ideas, reported here, are the products of these panels, working together over several months and culminating in a 3-day workshop in May 2007.

  10. What Causes Cost Overrun in Transport Infrastructure Projects?

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    cost escalation for three types of project ownership - private, state-owned enterprise and other public ownership - it is shown that the oft-seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. Type of accountability......This article presents results from the first statistically significant study of causes of cost escalation in transport infrastructure projects. The study is based on a sample of 258 rail, bridge, tunnel and roads projects worth US$90 billion. The focus is on the dependence of cost escalation on (1......) length of project implementation phase, (2) size of project and (3) type of project ownership. First, it is found with very high statistical significance that cost escalation is strongly dependent on length of implementation phase. The policy implications are clear: Decision makers and planners should...

  11. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  12. HET/JUPITER project assessment report

    International Nuclear Information System (INIS)

    Baxter, B.J.; Harrington, F.E.; Kaiser, G.G.; Wolf, J.

    1979-05-01

    This report is an assessment of the United States' Hot Engineering Test (HET) and the Federal Republic of Germany's Juelich Pilot Plant Thorium Element Reprocessing (JUPITER) Projects. The assessment was conducted with a view to developing mutually supportive roles in the achievement of hot engineering test objectives. Conclusions of the assessment are positive and identify several technical areas with potential for US/FRG cooperation. Recommendations presented in this report support a cost-effective US/FRG program to jointly develop high temperature gas-cooled reactor fuel recycle technology. (orig.) [de

  13. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  14. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  15. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  16. 10 CFR 609.12 - Project Costs.

    Science.gov (United States)

    2010-01-01

    ... to meet market requirements, reasonably required reserve funds and other carrying costs during... corporation or affiliated entity assessments, including organizational expenses; (3) Goodwill, franchise...

  17. Selecting and Ranking Cost Research Projects

    Science.gov (United States)

    1993-09-01

    Model (STACM) Enhancements Automated Cost Estimating Integrated Tools ( ACEIT ) Libraries BM/C 3 GEP Engineering and Cost BM/C 3 EP Engineering and Cost...50K NOM VHI 0.02635481 STACM ENHANCEMENTS NOM អK NOM VHI 0.02468682 ACEIT LIBRARIES VHI 50-IOOK HI VHI 0.06357704 GEP ENGRG. & COST VHI 100-150K VHl...0.02505922 SCATS LOW អK NOM VIII 0.02468682 PICES SUPPORT NOM 50-100K NOM VlIl 0.02455186 ACEIT SUPPORT VIII 50-100K VHI VHI 0.08208244 GUARDIAN

  18. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  19. The costs and benefits of smoke alarms in Canadian houses: report for Jacques Rousseau, Project Implementation Division, Canada Mortgage and Housing Corporation

    National Research Council Canada - National Science Library

    Hansen, A. T; Platts, R. E

    1990-01-01

    The study was intended to establish the effectiveness of smoke alarms, evaluate the costs and benefits of extending their use to houses that do not currently have them, and consider ways of improving...

  20. Projected cost comparison of nuclear electricity

    International Nuclear Information System (INIS)

    Juhn, P.E.; Hu, C.W.

    2000-01-01

    Comparison of electricity generation costs has been done in the late years through a large co-operation between several organisations. The studies are aiming to provide reliable comparison of electricity generating costs of nuclear and conventional base load power plants. This paper includes the result of the joint IAEA/OECD study published in 1997. (author)

  1. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  2. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    of Engineering, the Built. Environment, and .... works; identification of causes of cost overruns, as well as the control measures for .... project; poor project schedules and management; increases in the prices of .... conclusion, the magnitude of the cost overrun was reduced after ..... Research in Business, 3(11), pp. 775-780.

  3. Community Mental Health Clinic Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Healthcare Cost Report Information System (HCRIS) Dataset - Community Mental Health Center (CMHC). This data was reported on form CMS-2088-92. The data in this...

  4. FY 1997 cost savings report

    International Nuclear Information System (INIS)

    Sellards, J.B.

    1998-01-01

    With the end of the cold war, funding for the Environmental Management program increased rapidly as nuclear weapons production facilities were shut down, cleanup responsibilities increased, and facilities were transferred to the cleanup program. As funding for the Environmental Management (EM) program began to level off in response to Administration and Congressional efforts to balance the Federal budget, the program redoubled its efforts to increase efficiency and get more productivity out of every dollar. Cost savings and enhanced performance are an integral pair of Hanford Site operations. FY1997 was the third year of a cost savings program that was initially defined in FY 1995. The definitions and process remained virtually the same as those used in FY 1996

  5. Final Report: Hydrogen Production Pathways Cost Analysis (2013 – 2016)

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel Allan [Strategic Analysis Inc., Arlington, VA (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-30

    This report summarizes work conducted under a three year Department of Energy (DOE) funded project to Strategic Analysis, Inc. (SA) to analyze multiple hydrogen (H2) production technologies and project their corresponding levelized production cost of H2. The analysis was conducted using the H2A Hydrogen Analysis Tool developed by the DOE and National Renewable Energy Laboratory (NREL). The project was led by SA but conducted in close collaboration with the NREL and Argonne National Laboratory (ANL). In-depth techno-economic analysis (TEA) of five different H2 production methods was conducted. These TEAs developed projections for capital costs, fuel/feedstock usage, energy usage, indirect capital costs, land usage, labor requirements, and other parameters, for each H2 production pathway, and use the resulting cost and system parameters as inputs into the H2A discounted cash flow model to project the production cost of H2 ($/kgH2). Five technologies were analyzed as part of the project and are summarized in this report: Proton Exchange Membrane technology (PEM), High temperature solid oxide electrolysis cell technology (SOEC), Dark fermentation of biomass for H2 production, H2 production via Monolithic Piston-Type Reactors with rapid swing reforming and regeneration reactions, and Reformer-Electrolyzer-Purifier (REP) technology developed by Fuel Cell Energy, Inc. (FCE).

  6. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  7. Extreme project. Progress report 2006

    International Nuclear Information System (INIS)

    Eyrolle, F.; Masson, O.; Charmasson, S.

    2007-01-01

    The E.X.T.R.E.M.E. project introduced in 2005 to the S.E.S.U.R.E. / L.E.R.C.M. has for objectives to acquire data on the consequences of the extreme climatic meteorological episodes on the distribution of the artificial radioisotopes within the various compartments of the geosphere. This report presents the synthesis of the actions developed in 2006 in positioning and in co financing of the project by means of regional or national research programs (C.A.R.M.A., E.X.T.R.E.M.A., E.C.C.O.R.E.V.I.), of data acquisition, valuation and scientific collaboration. (N.C.)

  8. Least cost analysis of renewable energy projects

    International Nuclear Information System (INIS)

    Cosgrove-Davies, M.; Cabraal, A.

    1994-01-01

    This paper describes the methodology for evaluating dispersed and centralized rural energy options on a least cost basis. In defining the load to be served, each supply alternative must provide equivalent levels of service. The village to be served is defined by the number of loads, load density, distance from the nearest power distribution line, and load growth. Appropriate rural energy alternatives are identified and sized to satisfy the defined load. Lastly, a net present value analysis (including capital, installation, O and M, fuel, and replacement costs, etc.) is performed to identify the least cost option. A spreadsheet-based analytical tool developed by the World Bank's Asia Alternative Energy Unit (ASTAE) incorporates this approach and has been applied to compare photovoltaic solar home systems with other rural energy supply options in Indonesia. Load size and load density are found to be the critical factors in choosing between a grid and off-grid solution

  9. WP1 – Final project report

    NARCIS (Netherlands)

    Drachsler, Hendrik; Scheffel, Maren; Orrego, Carola; Stieger, Lina; Hartkopf, Kathleen; Henn, Patrick; Hynes, Helen; Przibilla, Monika; Geiger, Uschi; Schroeder, Hanna; Sopka, Sasa

    2015-01-01

    This report contains the complete project reporting of the PATIENT project from October 2012 until end of March 2015. It provides a summary of all project activities and achievements that are based on the previous WP deliverables such as the project progress reports from WP1 (D1.01) and the quality

  10. A framework for cost-aware process management: cost reporting and cost prediction

    NARCIS (Netherlands)

    Wynn, M.T.; Low, W.Z.; Hofstede, ter A.H.M.; Nauta, W.E.

    2014-01-01

    Organisations are constantly seeking efficiency gains for their business processes in terms of time and cost. Management accounting enables detailed cost reporting of business operations for decision making purposes, although significant effort is required to gather accurate operational data.

  11. International Chernobyl project [AEA report

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The IAEA have co-ordinated the first international assessment of the radiological consequences of the Chernobyl accident in the affected areas outside the 30km prohibited zone around the reactor. These areas have a total population of about 1 million people, living in approximately 2700 settlements. The main aim of the project was to answer the question 'Is it safe for the population to go on living in the affected areas?'. The project did not investigate radiological health effects among more than 100 000 people evacuated from the 30 km prohibited zone. Nor did it study effects among the emergency personnel temporarily brought into the region for accident management and recovery work (the so-called 'liquidators'). Project teams reviewed official data on environmental contamination from 500 settlements, data collection practices and reporting and also official information on radiation doses received by people living in seven settlements. Other project teams reviewed official data at key medical centres and institutes. Then they examined people both from surveyed contaminated settlement and from surveyed control settlements. The team concluded that there were significant non-radiation related health disorders in populations of both contaminated and control settlements. None of the disorders could be attributed directly to radiation exposure. In particular, no evidence was found for a significant increase in foetal abnormalities; infant and prenatal mortality rates had fallen since the accident. Children were found to be generally healthy with no abnormalities in either thyroid stimulating or thyroid hormones. The accident had created substantial negative psychological consequences, manifesting themselves in terms of anxiety and stress due to continuing high levels of uncertainty. (author)

  12. The Stripa project annual report 1984

    International Nuclear Information System (INIS)

    1985-07-01

    This is an autonomous OECD/NEA project relating to the final disposal of highly radioactive waste. Research is being performed in a granite formation 350 m below the ground surface. The first phase consists of three parts, namely hydrogeological and hydrogeochemical investigations in boreholes, tracer migration tests and large-scale tests of the behaviour of backfill material. The second phase includes the following investigations: detection and characterization of fracture zones, sealing of boreholes and shafts, hydrogoelogical characterization of the Stripa site and isotopic characterization of its groundwaters. The estimated cost of both phases is 111 MSEK and they are scheduled for completion in 1986. A summary of the progress of the project phase I and phase II is given in this report. (G.B.)

  13. Benchmarking for Cost Improvement. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy`s (DOE) Office of Environmental Restoration and Waste Management (EM) conducted the Benchmarking for Cost Improvement initiative with three objectives: Pilot test benchmarking as an EM cost improvement tool; identify areas for cost improvement and recommend actions to address these areas; provide a framework for future cost improvement. The benchmarking initiative featured the use of four principal methods (program classification, nationwide cost improvement survey, paired cost comparison and component benchmarking). Interested parties contributed during both the design and execution phases. The benchmarking initiative was conducted on an accelerated basis. Of necessity, it considered only a limited set of data that may not be fully representative of the diverse and complex conditions found at the many DOE installations. The initiative generated preliminary data about cost differences and it found a high degree of convergence on several issues. Based on this convergence, the report recommends cost improvement strategies and actions. This report describes the steps taken as part of the benchmarking initiative and discusses the findings and recommended actions for achieving cost improvement. The results and summary recommendations, reported below, are organized by the study objectives.

  14. Life cycle cost report of VHLW cask

    International Nuclear Information System (INIS)

    1995-06-01

    This document, the Life Cycle Cost Report (LCCR) for the VHLW Cask, presents the life cycle costs for acquiring, using, and disposing of the VHLW casks. The VHLW cask consists of a ductile iron cask body, called the shielding insert, which is used for storage and transportation, and ultimately for disposal of Defense High Level Waste which has been vitrified and placed into VHLW canisters. Each ductile iron VHLW shielding insert holds one VHLW canister. For transportation, the shielding insert is placed into a containment overpack. The VHLW cask as configured for transportation is a legal weight truck cask which will be licensed by NRC. The purpose of this LCCR is to present the development of the life cycle costs for using the VHLW cask to transport VHLW canisters from the generating sites to a disposal site. Life cycle costs include the cost of acquiring, operating, maintaining, and ultimately dispositioning the VHLW cask and its associated hardware. This report summarizes costs associated with transportation of the VHLW casks. Costs are developed on the basis of expected usage, anticipated source and destination locations, and expected quantities of VHLW which must be transported. DOE overhead costs, such as the costs associated with source and destination facility handling of the VHLW, are not included. Also not included are costs exclusive to storage or disposal of the VHLW waste

  15. Report to Congress on the U.S. Department of Energy's Environmental Management Science Program. Research funded and its linkages to environmental cleanup problems. High out-year cost environmental management project descriptions. Volume 3 of 3 - Appendix C

    International Nuclear Information System (INIS)

    1998-04-01

    The Department of Energy's Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation's nuclear complex. Appendix C provides details about each of the Department's 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research

  16. Health sector costs of self-reported food allergy in Europe: a patient-based cost of illness study

    NARCIS (Netherlands)

    Mugford, M.; Fox, M.; Voordouw, J.; Cornelisse-Vermaat, J.R.; Antonides, G.; Hoz Caballer, de la B.

    2013-01-01

    Introduction: Food allergy is a recognized health problem, but little has been reported on its cost for health services. The EuroPrevall project was a European study investigating the patterns, prevalence and socio-economic cost of food allergy. Aims: To investigate the health service cost for

  17. Health sector costs of self-reported food allergy in Europe : A patient-based cost of illness study

    NARCIS (Netherlands)

    Fox, Margaret; Mugford, Miranda; Voordouw, Jantine; Cornelisse-Vermaat, Judith; Antonides, Gerrit; de la Hoz Caballer, Belen; Cerecedo, Inma; Zamora, Javier; Rokicka, Ewa; Jewczak, Maciej; Clark, Allan B; Kowalski, Marek L; Papadopoulos, Nikos; Knulst, Anna C; Seneviratne, Suranjith; Belohlavkova, Simona; Asero, Roberto; de Blay, Frederic; Purohit, Ashok; Clausen, Michael; Flokstra de Blok, Bertine; Dubois, Anthony E; Fernandez-Rivas, Montserrat; Burney, Peter; Frewer, Lynn J; Mills, Clare E N

    2013-01-01

    Introduction: Food allergy is a recognized health problem, but little has been reported on its cost for health services. The EuroPrevall project was a European study investigating the patterns, prevalence and socio-economic cost of food allergy. Aims: To investigate the health service cost for

  18. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  19. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  20. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  1. Natural gas tariffs peak-free with freedom of choice for contracts. Final report of the project 'Balancing with cost-effectiveness with regard to the profile contract

    International Nuclear Information System (INIS)

    2008-12-01

    Market gardeners who approach the profile boundary of 170,000 m 3 gas may face high gas prices in certain situations. LTO Glaskracht Nederland (the Dutch association of entrepreneurs in this sector) examined this problem together with LTO Groeiservice (Organisation for Agriculture and Horticulture Growing). The final report provides recommendations for market gardeners and the organizations LTO Glaskracht Nederland and Productschap Tuinbouw (Commodity Board for Horticulture) [nl

  2. Achievement report on research and development in the Sunshine Project in fiscal 1976. (Electrotechnical Laboratory/Research and development cost); 1977 nendo kenkyu seika no gaiyo (kenkyu kaihatsuhi)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    This paper describes achievements in research and development of new energy technologies (the Sunshine Project) in fiscal 1997 at the General Research Institute for Electronics Technologies. In spectral radiance measurement of solar beam, the measurement is continued in ultraviolet and visible ray zones to accumulate and analyze the data, and a near infrared zone measuring device is completed to start the measurement. In solar heat power generation, studies are made on models, devices and materials, and discussions are given on their systematization. Fundamental studies are also being made on solar cells to pursue economical and technological feasibility of solar beam power generation systems. Fundamental studies are being performed to realize thermal electron power generation systems utilizing solar furnaces. Studies are being carried out to elucidate fundamental conditions for a hydrogen manufacturing method using high-temperature pyrolysis of water at 1,000 degrees C or higher. High-temperature solid electrolyte fuel cell elements are fabricated on a trial basis to elucidate the technological problems therein. Energy systems are identified as the sum including the mutual relationship between societies and nature to study optimal systems. Energy conversion utilizing low temperature differential (especially in marine application) is being discussed. The paper also describes studies on super-conducting magnets for energy storage. (NEDO)

  3. Retrospective Study of the Costs of EPA Regulations: A Report of Four Case Studies (2014)

    Science.gov (United States)

    Report discusses the factors that may account for differences between projected and actual regulatory costs and presents the findings of four case studies that attempt to assess compliance cost retrospectively.

  4. BIM cost analysis of transport infrastructure projects

    Science.gov (United States)

    Volkov, Andrey; Chelyshkov, Pavel; Grossman, Y.; Khromenkova, A.

    2017-10-01

    The article describes the method of analysis of the energy costs of transport infrastructure objects using BIM software. The paper consideres several options of orientation of a building using SketchUp and IES VE software programs. These options allow to choose the best direction of the building facades. Particular attention is given to a distribution of a temperature field in a cross-section of the wall according to the calculation made in the ELCUT software. The issues related to calculation of solar radiation penetration into a building and selection of translucent structures are considered in the paper. The article presents data on building codes relating to the transport sector, on the basis of which the calculations were made. The author emphasizes that BIM-programs should be implemented and used in order to optimize a thermal behavior of a building and increase its energy efficiency using climatic data.

  5. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  6. Projected Lifetime Healthcare Costs Associated with HIV Infection

    DEFF Research Database (Denmark)

    Nakagawa, Fumiyo; Miners, Alec; Smith, Colette J

    2015-01-01

    computer simulation model to project the distribution of lifetime outcomes and costs of men-who-have-sex-with-men (MSM) infected with HIV in 2013 aged 30, over 10,000 simulations. We assumed a resource-rich setting with no loss to follow-up, and that standards and costs of healthcare management remain...

  7. Waste Management Facilities Cost Information Report

    Energy Technology Data Exchange (ETDEWEB)

    Feizollahi, F.; Shropshire, D.

    1992-10-01

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

  8. Waste Management Facilities Cost Information Report

    International Nuclear Information System (INIS)

    Feizollahi, F.; Shropshire, D.

    1992-10-01

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options

  9. Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones-Albertus, Rebecca [U.S. Department of Energy

    2018-04-02

    The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as well as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.

  10. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  11. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  12. Implementation of online volatile fatty acids sensor for control and optimization of anaerobic process for low cost biogas production from manure. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Boe, K.; Angelidaki, I.

    2010-10-15

    Proper monitoring and control can improve process stability and enhance process performance for better economy of the biogas plants. Volatile fatty acid (VFA) is the most widely recognized as a direct, relevant measure of stability. Classic on-line measurement of individual VFA is based on filtration, which suffers from fouling when applied with manure slurries. A VFA sensor developed at DTU Environment, based on headspace chromatography technique could avoid the problems from particulate matters. In this work, the sensor had been implemented for online monitoring of the lab-scale and the pilot-scale manure digester. The industrial prototype of the VFA sensor and sample acquisition system has been constructed and implemented at a pilot scale biogas plant, located at Lundtofte, DTU. The VFA sensor has shown very satisfying results in terms of sensitivity and reliability for monitoring the biogas process. Moreover, the online VFA and biogas registration data were used as process indicators for automatic control of the biogas reactor. The results from control experiments confirmed that the combination of biogas production, total VFA concentration and propionate concentration could effectively reflect the dynamic state of the process which was very crucial for automatic control. Due to the standardized analyzing condition (pH<2, temperature>70 deg. C), the sensor responses were not affected by the manure composition (TS, VS or the addition of extra organics), which made these results representative for implementing in the full-scale biogas plant where some industrial organic wastes were added to increase the biogas production. During the project period, the sensor design and construction had been modified and tested several times to improve the robustness. However, the implementation of the sensor in full-scale biogas plant would need some further development such as improvement of mechanical design and further up-scaling depending on the dry solid content in the

  13. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  14. Spray casting project final report

    International Nuclear Information System (INIS)

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step

  15. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  16. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  17. Prototype road weather performance management tool : project report : draft report.

    Science.gov (United States)

    2016-09-30

    This report is the Project Report for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Uses Connected Vehicle Data (RW-...

  18. Sectoral Costs of Environmental Policy. Final Report

    International Nuclear Information System (INIS)

    Vercaemst, P.; Vanassche, S.; Campling, P.; Vranken, L.; Agnolucci, P.; Salmons, R.; Shaw, B.; Jantzen, J.; Van der Woerd, H.; Gruenig, M.; Best, A.

    2007-12-01

    The Directorate General for Environment of the European Commission has launched a study on the 'Sectoral costs of environmental policy'. The overall aim of the study is to obtain a clearer picture of the impact of environmental policy in some of the industrial sectors most affected by environmental policy, taking into account the differences between sectors and Member States. Previous studies mainly focussed on the individual impact of one Directive, but in this study we will assess the cumulative costs attributable to the environmental policy in its entirety and attempt to identify synergies between individual policies. The project has the following main objectives: paint a clearer picture of the environmental costs for the selected industries; indicate the differences in costs between individual companies; indicate the differences in costs between Member States; demonstrate the drivers for environmental expenditures of the companies and differences between sectors and Member States; describe different types of environmental regulation (policy instruments) and their impact on environmental expenditures; evaluate the environmental performance of the industries and differences between companies/Member States; collect evidence for the impacts of environmental regulation (and associated costs) on the competitiveness of companies; and carry out an international comparison. The sectors selected are:oil supply chain; electricity production; steel industry; and textile and leather industry

  19. The Hidden Cost of Regulation: The Administrative Cost of Reporting Serious Reportable Events.

    Science.gov (United States)

    Blanchfield, Bonnie B; Acharya, Bijay; Mort, Elizabeth

    2018-04-01

    More than half of the 50 states (27) and the District of Columbia require reporting of Serous Reportable Events (SREs). The goal is to hold providers accountable and improve patient safety, but there is little information about the administrative cost of this reporting requirement. This study was conducted to identify costs associated with investigating and reporting SREs. This qualitative study used case study methods that included interviewing staff and review of data and documents to investigate each SRE occurring at one academic medical center during fiscal year 2013. A framework of tasks and a model to categorize costs was created. Time was summarized and costs were estimated for each SRE. The administrative cost to process 44 SREs was estimated at $353,291, an average cost of $8,029 per SRE, ranging $6,653 for an environmental-related SRE to $21,276 for a device-related SRE. Care management SREs occurred most frequently, costing an average $7,201 per SRE. Surgical SREs, the most expensive on average, cost $9,123 per SRE. Investigation of events accounted for 64.5% of total cost; public reporting, 17.2%; internal reporting, 10.2%; finance and administration, 6.0%; and 2.1%, other. Even with 26 states mandating reporting, the 17.2% incremental cost of public reporting is substantial. Policy makers should consider the opportunity costs of these resources, averaging $8,029 per SRE, when mandating reporting. The benefits of public reporting should be collectively reviewed to ensure that the incremental costs in this resource-constrained environment continue to improve patient safety and that trade-offs are acknowledged. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  20. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  1. Final Project Report for Award ER65581

    Energy Technology Data Exchange (ETDEWEB)

    Stoy, Paul C. [Montana State Univ., Bozeman, MT (United States)

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  2. Project LIFT: Year 1 Report

    Science.gov (United States)

    Norton, Michael; Piccinino, Kelly

    2014-01-01

    Research for Action (RFA) is currently in the second year of a five-year external evaluation of the Project Leadership and Investment for Transformation (LIFT) Initiative in the Charlotte-Mecklenburg School District (CMS). Project LIFT is a public-private partnership between CMS and the local philanthropic and business communities in Charlotte,…

  3. Flexible resource management and its effect on project cost and duration

    Science.gov (United States)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  4. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  5. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  6. CERN Summer Student Project Report

    CERN Document Server

    Parton, Thomas

    2015-01-01

    My Summer Student project was divided between two areas: work on Thin Gap Chamber (TGC) Level-1 muon triggers for the ATLAS experiment, and data acquisition (DAQ) for an RPC muon detector at the Gamma Irradiation Facility (GIF++)

  7. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  8. Costs of RCRA corrective action: Interim report

    International Nuclear Information System (INIS)

    Tonn, B.; Russell, M.; Hwang Ho-Ling; Goeltz, R.; Warren, J.

    1991-09-01

    This report estimates the cost of the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) for all non-federal facilities in the United States. RCRA is the federal law which regulates the treatment, storage, disposal, and recovery of hazardous waste. The 1984 amendment to RCRA, known as the Hazardous and Solid Waste Amendments, stipulates that facilities that treat, store or dispose of hazardous wastes (TSDs) must remediate situations where hazardous wastes have escaped into the environment from their solid waste management units (SWMUs). The US Environmental Protection Agency (USEPA 1990a), among others, believes that the costs of RCRA corrective action could rival the costs of SUPERFUND. Evaluated herein are costs associated with actual remedial actions. The remedial action cost estimating program developed by CH2M Hill is known as the Cost of Remedial Action Model (CORA). It provides cost estimates, in 1987 dollars, by technology used to remediate hazardous waste sites. Rules were developed to categorize each SWMU in the RTI databases by the kinds of technologies that would be used to remediate them. Results were then run through CORA using various assumptions for variable values that could not be drawn from the RTI databases and that did not have CORA supplied default values. Cost estimates were developed under several scenarios. The base case assumes a TSD and SWMU universe equal to that captured in the RTI databases, a point of compliance at the SWMU boundary with no ability to shift wastes from SWMU to SWMU, and a best-as-practical clean-up to health-based standards. 11 refs., 12 figs., 12 tabs

  9. Hualapai Wind Project Feasibility Report

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, Kevin [Hualapai Tribe; Randall, Mark [Daystar Consulting; Isham, Tom [Power Engineers; Horna, Marion J [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.

    2012-12-20

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  10. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  11. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-03-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $210.6 million, total reported cost savings were $215.1 million, and total guaranteed cost savings were $204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

  12. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  13. The LiveWire Project final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, C.D.; Nelson, T.T. [Enova Technology, San Diego, CA (United States); Kelly, J.C.; Dominguez, H.A. [Paragon Consulting Services, La Verne, CA (United States)

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  14. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  15. Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

    2006-02-28

    This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle “quality” qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

  16. Summer Student Report - Project Kryolize

    CERN Document Server

    Drozdowski, Pawel

    2016-01-01

    The purpose of this document is to describe the work and results obtained by the author during his summer student internship at CERN. The author of this document was attached to the project Kryolize as a software developer, overtaking the job from a recently departed technical student.

  17. EBT-P project status report

    International Nuclear Information System (INIS)

    1983-11-01

    This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project

  18. GOWind Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, Ian [CEO

    2014-12-19

    To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

  19. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  20. Dynamic Cost-Contingency Management: A Method for Reducing Project Costs While Increasing the Probability of Success

    National Research Council Canada - National Science Library

    Kujawski, Edouard

    2007-01-01

    In the real world, "Money Allocated is Money Spent" (MAIMS). As a consequence, cost underruns are rarely available to protect against cost overruns, while task overruns are passed on to the total project cost...

  1. The DOE/AL cost and schedule control system (CS2) - A user's perspective in its use as both a reporting system and as a valuable project management tool

    International Nuclear Information System (INIS)

    Fate, Richard E.; Cox, Warren B.

    1992-01-01

    Sandia National Laboratories (SNL) Environmental Restoration (ER) Program has recently implemented a highly structured CS 2 required by DOE. It is a complex system which has evolved over a period of a year and a half. During the implementation of this system) problem areas were discovered in cost estimating, allocation of management costs, and integration of the CS 2 system with the Sandia Financial Information System. In addition to problem areas, benefits of the system were found in the areas of schedule adjustment, projecting personnel requirements, budgeting, and responding to audits. Finally, a number of lessons were learned regarding how to successfully implement the system. (author)

  2. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  3. Ceramic Technology Project semiannual progress report, October 1992--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, D.R.

    1993-09-01

    This project was developed to meet the ceramic technology requirements of the OTS`s automotive technology programs. Although progress has been made in developing reliable structural ceramics, further work is needed to reduce cost. The work described in this report is organized according to the following work breakdown structure project elements: Materials and processing (monolithics [Si nitride, carbide], ceramic composites, thermal and wear coatings, joining, cost effective ceramic machining), materials design methodology (contact interfaces, new concepts), data base and life prediction (structural qualification, time-dependent behavior, environmental effects, fracture mechanics, nondestructive evaluation development), and technology transfer.

  4. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  5. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  6. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  7. Project Rulison: a preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M Jr; Bray, B G; Mann, R L

    1970-01-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Tuli Rulison field in Garfield County, Colorado. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90 to 125 billion cu ft per 640 acres from earlier wells, was confirmed from information obtained on 2 conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas-flow computer model. (20 refs.)

  8. Support to LANL: Cost estimation. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors

  9. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  10. The Stripa project. Annual report 1990

    International Nuclear Information System (INIS)

    1991-07-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The research and development division of the Swedish Nuclear Fuel and Waste Management Co. (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1990

  11. The Stripa project. Annual report 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) hsa been enstrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1988. (36 figs., 4 tabs.)

  12. The Stripa project annual report 1991

    International Nuclear Information System (INIS)

    1992-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1991

  13. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    OpenAIRE

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is a...

  14. Photovoltaic demonstration project. Final report

    International Nuclear Information System (INIS)

    Jicarilla Apache Tribe

    2002-01-01

    The Jicarilla Apache Nation is in Rio Arriba County in North Central New Mexico. The photovoltaic project was installed at the Dulce High School in the town of Dulce. Dulce is in the most northern part of the reservation near the New Mexico/Colorado boundary and can be reached from the New Mexico State Capitol in Santa Fe, hence to the town of Chama along U.S. Highway 84 to the junction of U.S. Highway 64. Dulce is about 12 miles west of the junction along U.S. Highway 64. Dulce community is in the mountainous part of the Nation with a population of about 4000. No industry exists in the community, however, a few commercial sites do exist such as a motel, restaurants, gas stations, food and liquor stores

  15. ECOGEN 4th Project Report

    DEFF Research Database (Denmark)

    Krogh, Paul Henning

    to be larger than Bt-effects for parameters such as soil nematode abundance. Our field studies are now completed and the data are being published in scientific journals. The GMHT corn and reduced tillage farming practice were included in the sampling programme and have improved the versatility of the ECOGEN...... ecological investigations of GM farming systems considerably. The divergent scientific domains covering agricultural-, ecological, ecotoxicological and economic sciences were skilfully integrated by the WP6 team and have resulted in useful output published in international journals. The economic studies...... comprising all aspect of the project such as collection, analysis, integration, presentation and publication of data and results. The integrative data mining and decision support activities have resulted in novel analyses of farming system ecology and economics. Results from all WP’s have been efficiently...

  16. Project Rulison: A preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Miles Jr [Austral Oil Company Incorporated, Houston, TX (United States); Bray, Bruce G; Mann, Robert L [CER Geonuclear Corporation, Las Vegas, NV (United States)

    1970-05-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Rulison Field in Garfield County, Colorado. Since discovery in 1952, this reservoir has been tested by nine widely-spaced conventionally completed wells. A method of stimulation, far greater in magnitude and efficiency than conventional hydraulic fracturing, is needed to recover this gas at economic rates. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90-125 billion cubic feet per 640 acres from earlier wells, was confirmed from information obtained on two conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas flow computer model. A nuclear explosive with a design yield of 40 kilotons was emplaced in a 10-3/4 inch hole at a depth of 8426 feet below ground surface and detonated on September 10, 1969. A preliminary appraisal of the data taken at shot time indicate that the explosive behaved as predicted. The explosion was completely contained underground as predicted and no major seismic damage occurred. The post-shot drilling program, to reenter the chimney, will congruence in March 1970, approximately six months after detonation. A test program will be initiated at that time to determine the degree of reservoir stimulation achieved. (author)

  17. Alcoholism treatment and medical care costs from Project MATCH.

    Science.gov (United States)

    Holder, H D; Cisler, R A; Longabaugh, R; Stout, R L; Treno, A J; Zweben, A

    2000-07-01

    This paper examines the costs of medical care prior to and following initiation of alcoholism treatment as part of a study of patient matching to treatment modality. Longitudinal study with pre- and post-treatment initiation. The total medical care costs for inpatient and outpatient treatment for patients participating over a span of 3 years post-treatment. Three treatment sites at two of the nine Project MATCH locations (Milwaukee, WI and Providence, RI). Two hundred and seventy-nine patients. Patients were randomly assigned to one of three treatment modalities: a 12-session cognitive behavioral therapy (CBT), a four-session motivational enhancement therapy (MET) or a 12-session Twelve-Step facilitation (TSF) treatment over 12 weeks. Total medical care costs declined from pre- to post-treatment overall and for each modality. Matching effects independent of clinical prognosis showed that MET has potential for medical-care cost-savings. However, patients with poor prognostic characteristics (alcohol dependence, psychiatric severity and/or social network support for drinking) have better cost-savings potential with CBT and/or TSF. Matching variables have significant importance in increasing the potential for medical-care cost-reductions following alcoholism treatment.

  18. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  19. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  20. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  1. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  2. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  3. Decomposable Mandrel Project. Progress report

    International Nuclear Information System (INIS)

    Letts, S.A.; Fearon, E.; Allison, L.; Buckley, S.; Saculla, M.; Cook, R.

    1995-01-01

    We report on our progress in developing a new technology to produce both Nova and NIF scale capsules using a depolymerizable mandrel. In this technique we use poly(α-methylstyrene) (PAMS) beads or shells as mandrels which are overcoated with plasma polymer. The poly(α-methylstyrene) mandrel is then thermally depolymerized to gas phase monomer which diffuses away through the more thermally stable plasma polymer coating, leaving a hollow shell. Since our last report we have concentrated on characterization of the final shell. Starting with PAMS bead mandrels leads to distorted pyrolyzed shells because of thermally induced creep of the CH coating. We found that plasma polymer coatings on hollow shell mandrels shrink isotropically during pyrolysis and maintain sphericity. We are now concentrating our efforts on the use of microencapsulated shells to prepare targets with buried diagnostic layers or inner wall surface texture

  4. Flammable gas project topical report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, G.D.

    1997-01-29

    The flammable gas safety issue was recognized in 1990 with the declaration of an unreviewed safety question (USQ) by the U. S. Department of Energy as a result of the behavior of the Hanford Site high-level waste tank 241-SY-101. This tank exhibited episodic releases of flammable gas that on a couple of occasions exceeded the lower flammability limit of hydrogen in air. Over the past six years there has been a considerable amount of knowledge gained about the chemical and physical processes that govern the behavior of tank 241-SY-1 01 and other tanks associated with the flammable gas safety issue. This report was prepared to provide an overview of that knowledge and to provide a description of the key information still needed to resolve the issue. Items covered by this report include summaries of the understanding of gas generation, retention and release mechanisms, the composition and flammability behavior of the gas mixture, the amounts of stored gas, and estimated gas release fractions for spontaneous releases. `Me report also discusses methods being developed for evaluating the 177 tanks at the Hanford Site and the problems associated with these methods. Means for measuring the gases emitted from the waste are described along with laboratory experiments designed to gain more information regarding rates of generation, species of gases emitted and modes of gas storage and release. Finally, the process for closing the USQ is outlined as are the information requirements to understand and resolve the flammable gas issue.

  5. ROLL OUT THE TALENT : Final project report

    OpenAIRE

    Eerola, Tuomas; Tuominen, Pirjo; Hakkarainen, Riitta-Liisa; Laurikainen, Marja; Mero, Niina

    2014-01-01

    The ROLL OUT THE TALENT project was born out of the desire to recognise and support the strengths of vocational students and to develop new and innovative operating models. ROLL OUT THE TALENT promoted regional cooperation between institutes and companies. The project produced operating and study path models that take into consideration the individual strengths of vocational students and the principles of lifelong learning. This is the final report of the ROLL OUT THE TALENT project, and ...

  6. Annual Report 2015: Project Glossines

    International Nuclear Information System (INIS)

    2016-04-01

    On the basis of the results of the feasibility study which (i) confirmed the presence of Glossina palpalis gambiensis on the Dakar-Thies-Kayar triangle and the disease it transmits (trypanosomiasis) and (ii) Isolated from the area in relation to other tsetse infested areas, the control phase started in 2010. The following results were obtained: block I (Kayar) has been rehabilitated since 2012; populations of tsetse flies are reduced to more than 99% in Block II (Sebikotane, Diacsaw Peulh, Pout) where the release of sterile males of tsetse fly sterile insect technique since 2013 for the complete liberation of the area, are terminally ill; the reduction of tsetse populations has started since June 2015 in blocks 3a (Dakar, Rufisque) and 3b (Thies) with a success rate of more than 95%. Starting of sterile male releases is planned for June 2016; the prevalence of trypanosomiasis, a disease transmitted by tsetse flies, increased from 10% to less than 1%; the total elimination of tsetse flies in the Niayes area is expected by the end of 2017. Activities in 2015 consisted of entomological monitoring throughout the Project area (blocks 1, 2 and 3), suppression in the block 3, elimination in block 2, parasitological monitoring, environmental monitoring and socio-economic study at the selected sites. (Author)

  7. Projected Costs of Generating Electricity - 2015 Edition. Executive Summary

    International Nuclear Information System (INIS)

    2015-01-01

    This joint report by the International Energy Agency (IEA) and the Nuclear Energy Agency (NEA) is the eighth in a series of studies on electricity generating costs. As policy makers work to ensure that the power supply is reliable, secure and affordable, while making it increasingly clean and sustainable in the context of the debate on climate change, it is becoming more crucial that they understand what determines the relative cost of electricity generation using fossil fuel, nuclear or renewable sources of energy. A wide range of fuels and technologies are presented in the report, including natural gas, coal, nuclear, hydro, solar, onshore and offshore wind, biomass and biogas, geothermal, and combined heat and power, drawing on a database from surveys of investment and operating costs that include a larger number of countries than previous editions. The analysis of more than 180 plants, based on data covering 22 countries, reveals several key trends, pointing, for example, to a significant decline in recent years in the cost of renewable generation. The report also reveals that nuclear energy costs remain in line with the cost of other base-load technologies, particularly in markets that value de-carbonisation. Overall, cost drivers of the different generating technologies remain both market-specific and technology-specific. Readers will find a wealth of details and analysis, supported by over 200 figures and tables, underlining this report's value as a tool for decision makers and researchers concerned with energy policies, climate change and the evolution of power sectors around the world. (authors)

  8. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Science.gov (United States)

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  9. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  10. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  11. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  12. The Oregon Applied Academics Project: Final Report

    Science.gov (United States)

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  13. National Writing Project. 2011-2012 Report

    Science.gov (United States)

    National Writing Project (NJ1), 2012

    2012-01-01

    This National Writing Project 2011-2012 Report describes how Writing Project teacher-leaders study and share effective practices that enhance student writing and learning, work collaboratively with other educators, design resources, and take on new roles in effecting positive change. It includes a financial summary for years ended September 30 for…

  14. CENELEC Project Report Smart House Roadmap (draft)

    NARCIS (Netherlands)

    Hartog, F.T.H. den; Suters, T.; Parsons, J.; Faller, J.

    2010-01-01

    This CENELEC project report has been drafted by a project team and steering group of representatives of interested parties and is to be endorsed on 2010-11-23. Neither the national members of CENELEC nor the CEN-CENELEC Management Centre can be held accountable for the technical content of this

  15. Project Elderly. Interim and Final Reports.

    Science.gov (United States)

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  16. UMTRA project list of reportable occurrences

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

  17. UMTRA project list of reportable occurrences

    International Nuclear Information System (INIS)

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items

  18. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, Laura J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-02

    This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

  19. Cost Finding Principles and Procedures. Preliminary Field Review Edition. Technical Report 26.

    Science.gov (United States)

    Ziemer, Gordon; And Others

    This report is part of the Larger Cost Finding Principles Project designed to develop a uniform set of standards, definitions, and alternative procedures that will use accounting and statistical data to find the full cost of resources utilized in the process of producing institutional outputs. This technical report describes preliminary procedures…

  20. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  1. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  2. Budget Period 1 Summary Report: Hywind Maine Project

    Energy Technology Data Exchange (ETDEWEB)

    Keiser, Meagan [Statoil, Stavanger (Norway)

    2014-02-28

    In accordance with the Statement of Project Objectives (SOPO) agreed to between the Department of Energy (“DOE”) and Statoil for the Hywind Maine project, Statoil hereby submits a Budget Period 1 Summary Report which includes accomplishments for the project. The report includes summaries of the other submitted reports (see Section 1.2-2) and progress regarding innovations leading to potential reductions in the Cost of Energy (see Section 3). The Hywind Demo project, the world’s first full-scale 2.3 megawatts (MW) floating wind turbine, installed at a water depth of 200 meter (m), 10 kilometer (km) off the coast of Norway, has proven that the Hywind floating substructure is a suitable platform for conventional multi- MW turbines. A principal goal of the Hywind Maine Project was to leverage that experience, both to demonstrate the commercial feasibility of the technology and to further develop and optimize the technology all in order to bring the costs down in a larger scale development. With the Hywind Maine Project, Statoil planned to deploy four turbines of 3 MW in approximately 140 meters water depth. Although the project in Maine will not move forward, much value was gained through the BP1 work package. Advanced modeling related to the design basis, which will have applicability beyond the Maine project, was completed. In addition, initial supply chain analyses were conducted, which will help assist with development of updated cost of energy models. Geophysical and various environmental surveys were also conducted, the results of which Statoil has committed to share publicly, and which will help build a database of information that future developers may be able to access. Finally, Statoil gained a greater understanding of the US offshore wind industry and related markets, which will assist the company as it looks for full-scale, commercial opportunities.

  3. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume III, Appendix B, Fisheries Report; Appendix C, Engineering Alternative Evaluation; Appendix D, Benefit/Cost Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developd to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. This volume contains appendices of habitat survey data, potential production, resident fish population data, upstream passage designs, and benefit/cost calculations. (ACR)

  4. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  5. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  6. Foam shell project: Progress report

    International Nuclear Information System (INIS)

    Overturf, G.; Reibold, B.; Cook, B.; Schroen-Carey, D.

    1994-01-01

    The authors report on their work to produce a foam shell target for two possible applications: (1) as liquid-layered cryogenic target on Omega Upgrade, and (2) as a back-up design for the NIF. This target consists of a roughly 1 mm diameter and 100 μm thick spherical low-density foam shell surrounding a central void. The foam will be slightly overfilled with liquid D 2 or DT, the overfilled excess being symmetrically distributed on the inside of the shell and supported by thermal gradient techniques. The outside of the foam is overcoated with full density polymer which must be topologically smooth. The technology for manufacturing this style of foam shell involves microencapsulation techniques and has been developed by the Japanese at ILE. Their goal is to determine whether this technology can be successfully adapted to meet US ICF objectives. To this end a program of foam shell development has been initiated at LLNL in collaboration with both the General Atomics DOE Target Fabrication Contract Corporation and the Target Fabrication Group at LLE

  7. Laser fusion project: initial report

    International Nuclear Information System (INIS)

    Boyd, D.C.; Dumbaugh, W.H.; Morgan, D.W.; Spivack, B.D.

    1977-01-01

    The objective of the first year program is to explore and characterize fluoride glass systems to find a glass with the lowest possible nonlinear refractive index, satisfactory chemical durability, and physical properties which enable casting large optical quality pieces. A second part of this objective is to explore techniques for forming optical quality fluoride glass. Beryllium fluoride type glasses offer the best approach. In order to achieve the objectives, the first main task is to provide a facility and equipment to safely work in beryllium fluoride type systems. The main emphasis of this report is a description of facility and equipment along with a schedule for the first year's research. Some preliminary exploration of the beryllium fluoride type glasses has indicated that achievement of the objectives is feasible. Expansion coefficients (25 to 300 0 C) are in the 150 x 10 -7 / 0 C region and annealing points are around 350 0 C. A number of beryllium-free fluoride glasses have also been made in small quantities

  8. Cost Assessment Methodology and Economic Viability of Tidal Energy Projects

    Directory of Open Access Journals (Sweden)

    Eva Segura

    2017-11-01

    Full Text Available The exploitation of technologies with which to harness the energy from ocean currents will have considerable possibilities in the future thanks to their enormous potential for electricity production and their high predictability. In this respect, the development of methodologies for the economic viability of these technologies is fundamental to the attainment of a consistent quantification of their costs and the discovery of their economic viability, while simultaneously attracting investment in these technologies. This paper presents a methodology with which to determine the economic viability of tidal energy projects, which includes a technical study of the life-cycle costs into which the development of a tidal farm can be decomposed: concept and definition, design and development, manufacturing, installation, operation and maintenance and dismantling. These cost structures are additionally subdivided by considering their sub-costs and bearing in mind the main components of the tidal farm: the nacelle, the supporting tidal energy converter structure and the export power system. Furthermore, a technical study is developed in order to obtain an estimation of the annual energy produced (and, consequently, the incomes generated if the electric tariff is known by considering its principal attributes: the characteristics of the current, the ability of the device to capture energy and its ability to convert and export the energy. The methodology has been applied (together with a sensibility analysis to the particular case of a farm composed of first generation tidal energy converters in one of the Channel Island Races, the Alderney Race, in the U.K., and the results have been attained by means of the computation of engineering indexes, such as the net present value, the internal rate of return, the discounted payback period and the levelized cost of energy, which indicate that the proposed project is economically viable for all the case studies.

  9. 40 CFR 35.925-18 - Limitation upon project costs incurred prior to award.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Limitation upon project costs incurred...-Clean Water Act § 35.925-18 Limitation upon project costs incurred prior to award. That project... project costs in the following cases: (1) Step 1 work begun after the date of approval by the Regional...

  10. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  11. The fracture zone project - final report

    International Nuclear Information System (INIS)

    Andersson, Peter

    1993-09-01

    This report summarizes the work and the experiences gained during the fracture zone project at the Finnsjoen study site. The project is probably the biggest effort, so far, to characterize a major fracture zone in crystalline bedrock. The project was running between 1984-1990 involving a large number of geological, geohydrological, geochemical, and geomechanical investigation. The methods used for identification and characterization are reviewed and discussed in terms of applicability and possible improvements for future investigations. The discussion is exemplified with results from the investigation within the project. Flow and transport properties of the zone determined from hydraulic tests and tracer tests are discussed. A large number of numerical modelling efforts performed within the fracture zone project, the INTRAVAL project, and the SKB91-study are summarized and reviewed. Finally, occurrence of similar zones and the relevance of major low angle fracture zones in connection to the siting of an underground repository is addressed

  12. Cryogenic Barrier Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  13. PEM Low Cost Endplates. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Martin; Clyens, S.; Steenstrup, F.R.; Christiansen, Jens [Danish Technological Institute. Plastics Technology, Taastrup (Denmark); Yde-Andersen, S. [IRD Fuel Cell A/S, Svendborg (Denmark)

    2013-03-15

    In the project, an endplate for the PEM-type fuel cells has been developed. The initial idea was to use an injection mouldable fibre reinforced polymer to produce the endplate and thereby exploit the opportunities of greater geometrical freedom to reduce weight and material consumption. Different PPS/glass-fibre compounds were produced and tested in order to use the results to optimize the results on the computer through FEM simulations. As it turned out, it was impossible to achieve adequate stiffness for the endplates within the given geometrical limitations. At the relatively high temperatures at which the endplates operate the material simply goes to soft. Material focus shifted to fibre reinforced high strength concrete composite. Test specimens were produced and tested so the results again could be used for FEM-simulations which also accounted for the technical limitations the concrete composite has regarding casting ability. In the process, the way the endplate is mounted was also alternated to better accommodate the properties of the concrete composite. A number of endplates were cast in specially produced moulds in order to map the optimum process parameters, and a final endplate was tested at IRD Fuel Cells A/S. The field test was in many aspects successful. However, the gas sealing and the surface finish can be further improved. The weight may still be an issue for some applications, even though it is lower than the endplate currently used. This issue can be addressed in a future project. The work has resulted in a new endplate design, which makes the stack assembly simpler and with fewer components. The endplates fabrication involves low cost methods, which can be scaled up as demand of fuel cells begin to take off. (Author)

  14. Supercompaction/grouting demonstration project: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this supercompaction demonstration project was to allow Martin Marietta Energy Systems, Inc. (The Company), to obtain cost analysis and performance information on volume reduction and waste encapsulation of solid, low-level contaminated waste (SLW). Ultimately, this information will be used to help define a waste disposal process for SLW that is acceptable to regulatory agencies and the US Department of Energy, Oak Ridge Operations (DOE/ORO). The technical objectives of the demonstration project were: (1) to obtain detailed performance data on each of the compacted barrels; (2) evaluate operating performance problems that may have occurred; (3) describe in detail the compaction and encapsulation process; and (4) to obtain operating cost data for the performance of this demonstration

  15. Savage Island Project borehole completion report

    International Nuclear Information System (INIS)

    Chamness, M.A.; Gilmore, T.J.; Teel, S.S.

    1993-02-01

    This report discusses three wells which were drilled in 1990 and 1991 in support of Pacific Northwest Laboratory's Ground-Water surveillance Project. These wells were intended to monitor the Rattlesnake Ridge interbed aquifer and the deeper portion of the unconfined aquifer to determine whether ground-water contamination emanating from the Hanford Site was migrating offsite through these aquifers. This report discusses well construction, lithologies encountered, and other data collected during drilling. At least three reports have been or are being prepared to discuss the results of this well monitoring project

  16. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  17. Resource Roads demonstration project : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  18. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  19. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  20. Leven estuary project. Fisheries Department final report

    OpenAIRE

    Bayliss, B.D.

    1997-01-01

    This is the report on the Leven estuary project: Fisheries Department final report produced by the Environment Agency North West in 1997. This report contains information about Leven estuary, river Leven catchment, river Crake catchment and the Ulverston Discharges. The Leven estuary is characterised by being very shallow, and shares the extremely variable tides and currents that characterize the whole of Morecambe Bay. There was little detailed knowledge of the impact on the Leven estuary, a...

  1. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  2. Manufacturing Methods and Technology Project Summary Reports

    Science.gov (United States)

    1984-12-01

    Powder ME-16 Type Recoil Mechanism Testing Machine (Powder Gymnasticator ) Projects 677, 78 7814 - Synthetic Quenchants for ME-18 Heat Treating Weapon...were deemed most urgent. These two were the prime candidates for the GEPTTA. Figure I is an artist depiction of the General Purpose Transportability...REPORT (RCS DRCMT-302) MMT Project 677 7753 titled "Noise Suppressor for Powder Type Recoil Mecha- nism Testing Machine (Powder Gymnasticator )" was

  3. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  4. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-01-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

  5. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  6. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  7. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  8. Town of Edinburg landfill reclamation demonstration project. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County, with majority funding provided by the New York State Energy Research and Development Authority. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified

  9. Project 2nd Periodic Report - Section 2

    DEFF Research Database (Denmark)

    Healy, Mark; Knowles, Emma; Johnstone, Cameron

    The work described in this publication has received support from the European Community - Research Infrastructure Action under the FP7 “Capacities” Specific Programme through grant agreement number 262552, MaRINET. Project Periodic Report. 2nd Period: October 2012 – March 2014 inclusive.......The work described in this publication has received support from the European Community - Research Infrastructure Action under the FP7 “Capacities” Specific Programme through grant agreement number 262552, MaRINET. Project Periodic Report. 2nd Period: October 2012 – March 2014 inclusive....

  10. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  11. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  12. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  13. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  14. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  15. Project Progress Assessment Report (PPAR) 2015

    International Nuclear Information System (INIS)

    Sall, Baba

    2015-01-01

    This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.

  16. Project Progress Assessment Report (PPAR) 2012

    International Nuclear Information System (INIS)

    Sall, Baba

    2012-01-01

    This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.

  17. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  18. Nuclear safety research project. Annual report 1995

    International Nuclear Information System (INIS)

    Hueper, R.

    1996-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZK) has been part of the Nuclear Safety Research Project (PSF) since 1990. The present annual report 1995 summarizes the R and D results. The research tasks are coordinated in agreement with internal and external working groups. The contributions to this report correspond to the status of early 1996. An abstract in English precedes each of them, whenever the respective article is written in German. (orig.) [de

  19. Quality of Security Service Costing Demonstration for the MSHN Project

    National Research Council Canada - National Science Library

    Spyropoulou, Evdoxia

    2000-01-01

    .... Each service has two costs: an initialization cost and a run-time cost. The demonstration illustrates the costs incurred as network modes and security levels are changed. High level and detailed specifications are provided.

  20. Automotive Manufacturers' Cost/Revenue, Financial and Risk Analysis : Projected Impact of Automobile Manufacturing on the Plastics Industry

    Science.gov (United States)

    1979-08-01

    The report is part of a study to update the historical and projected cost/revenue analysis of the U.S. domestic automobile manufacturers. It includes the evaluation of the historical and projected financial data to assess the corporate financial posi...

  1. NCSS Peace Studies Project: An Interim Report.

    Science.gov (United States)

    Ferber, Michael

    This preliminary report of a National Council for the Social Studies (NCSS) project briefly assesses teaching materials related to peace and nuclear warfare. Covering elementary, secondary, and higher education, the materials discussed present a variety of activities, decision-making approaches, and analytical assessments of policies of many…

  2. National Writing Project 2009 Annual Report

    Science.gov (United States)

    National Writing Project (NJ1), 2009

    2009-01-01

    Writing as a tool for thinking, learning, and communicating is crucial to academic and career success as well as to active citizenship in a democracy. This annual report of the National Writing Project features teachers of math, chemistry, art, history, and business who develop their students as writers. These educators employ writing to engage…

  3. Minewater heat recovery project. Final Technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  4. Federal Workplace Literacy Project. Internal Evaluation Report.

    Science.gov (United States)

    Matuszak, David J.

    This report describes the following components of the Nestle Workplace Literacy Project: six job task analyses, curricula for six workplace basic skills training programs, delivery of courses using these curricula, and evaluation of the process. These six job categories were targeted for training: forklift loader/checker, BB's processing systems…

  5. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  6. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  7. The international Chernobyl project. Technical report

    International Nuclear Information System (INIS)

    1991-01-01

    This report contains the findings of the International Chernobyl Project. Separate chapters deal with the history of the accident and the Soviet emergency measures, environmental contamination, radiation exposure of the population, health impact, and protective measures. The conclusions and recommendations of the Project are presented, and an annex gives the available data on cesium 137 and strontium 90 contamination levels in populated areas of the BSSR, the RSFSR and the UkrSSR from June/July 1989: these data were used to draw up the area contamination maps. Ref, figs and tabs

  8. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  9. Identifying an Australian ‘Shadow’ Benefit / Cost Ratio for Public Projects

    OpenAIRE

    Lawrence, Craig

    2009-01-01

    This paper examines the social opportunity cost of a hypothetical public project in Australia and compares these values with the cost of the project as measured by factor prices. Since 2001, the Australian taxation system has included an ad valorem tax, the Goods and Services Tax, however relatively little analysis of the impact of this tax on public project evaluation methods has been undertaken. This tax creates divergences between social opportunity cost and conventional cost measures. The...

  10. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  11. LBNL report of the vetting review of the GRETINA project

    International Nuclear Information System (INIS)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.

    2004-01-01

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas

  12. The cost of wetland creation and restoration. Final report, [February 12, 1992--April 30, 1994]- Draft

    Energy Technology Data Exchange (ETDEWEB)

    King, D.; Costanza, R.

    1994-07-11

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  13. Status Report Kuwait Nuclear Data Project

    Energy Technology Data Exchange (ETDEWEB)

    Farhan, A. [Kuwait Nuclear Data Center, Kuwait University, Kuwait (Kuwait)

    2013-08-15

    This report covers the Kuwaiti group's activities for the period April 2011 - January 2013. The Kuwait Group will continue its collaboration in order to fulfill its commitments. The Kuwait Nuclear Data Project has permanent responsibility for evaluating and updating ENSDF for A = 74 -80. The status of the mass chains is: - A = 74 (2006), - A = 75 (1999) {radical}, - A = 76 (1995) {radical}, - A = 77 (2012), - A = 78 (2009), - A = 79 (2002), - A = 80 (2005)

  14. Nuclear Safety Project - annual report 1980

    International Nuclear Information System (INIS)

    1981-08-01

    The Annual Report 1980 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1980 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work completed, essential results, plans for the near future. (orig./RW) [de

  15. Combined Final Report for Colony II Project

    Energy Technology Data Exchange (ETDEWEB)

    Kale, Laxmikant [University of Illinois; Jones, Terry [Oak Ridge National Laboratory; Moreira, Jose [IBM Corp.

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  16. Carbon disclosure project report 2009 : Canada 200

    International Nuclear Information System (INIS)

    Campbell, G.

    2009-01-01

    The carbon disclosure project conducts an annual survey to determine the strategies and actions of major cap companies in relation to climate change. This report discussed initiatives implemented by Canada's largest companies to prepare for a carbon-constrained future. The report documented results from 97 companies. The aim of the report was to help companies make use of the disclosures as reference points for future carbon markets and regulations relating to reporting requirements. Results of the survey demonstrated that Canada's low-carbon and high-carbon impact sectors have implemented several significant initiatives and best practices for operations. However, widespread engagement in a comprehensive manner has yet to be achieved. Many respondents were in the process of developing a more balanced risk-opportunity agenda in relation to climate change, and nearly half of all respondents have implemented governance arrangements or personal incentives in both both the high-carbon and low-carbon impact sectors. 5 tabs., 26 figs.

  17. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  18. Carbon Accounting and Cost Estimation in Forestry Projects Using CO2Fix V.3

    International Nuclear Information System (INIS)

    Groen, T.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is applied to four cases: (1) Joint implementation afforestation project in Romania, (2) Forest management project in Central Europe, (3) Reduced impact logging possibly under the Clean Development Mechanism (CDM) in the future, and (4) Afforestation with native species under the Clean Development Mechanism. The results show the wide applicability of CO2FIX, from degrading grasslands as baseline cases to multiple cohort forest ecosystems. Also the results show that Forest Management in the European case can generate considerable amounts of carbon emission reductions. Further, the results show that although reduced impact logging is not yet an allowed option under the Clean Development Mechanism, it shows promising results in that it is (1) very cost effective, (2) seems to be able to generate intermediate amounts of credits and (3) seems to us as a project type that is not prone to leakage issues. These results are yet another indication to seriously consider reduced impact logging as an eligible measure under the CDM

  19. Genetic algorithm for project time-cost optimization in fuzzy environment

    Directory of Open Access Journals (Sweden)

    Khan Md. Ariful Haque

    2012-12-01

    Full Text Available Purpose: The aim of this research is to develop a more realistic approach to solve project time-cost optimization problem under uncertain conditions, with fuzzy time periods. Design/methodology/approach: Deterministic models for time-cost optimization are never efficient considering various uncertainty factors. To make such problems realistic, triangular fuzzy numbers and the concept of a-cut method in fuzzy logic theory are employed to model the problem. Because of NP-hard nature of the project scheduling problem, Genetic Algorithm (GA has been used as a searching tool. Finally, Dev-C++ 4.9.9.2 has been used to code this solver. Findings: The solution has been performed under different combinations of GA parameters and after result analysis optimum values of those parameters have been found for the best solution. Research limitations/implications: For demonstration of the application of the developed algorithm, a project on new product (Pre-paid electric meter, a project under government finance launching has been chosen as a real case. The algorithm is developed under some assumptions. Practical implications: The proposed model leads decision makers to choose the desired solution under different risk levels. Originality/value: Reports reveal that project optimization problems have never been solved under multiple uncertainty conditions. Here, the function has been optimized using Genetic Algorithm search technique, with varied level of risks and fuzzy time periods.

  20. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  1. Final Report: Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications (2012-2016)

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); Huya-Kouadio, Jennie Moton [Strategic Analysis Inc., Arlington, VA (United States); Houchins, Cassidy [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel Allen [Strategic Analysis Inc., Arlington, VA (United States)

    2016-09-01

    This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.

  2. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  3. Ceramic Technology Project. Semiannual progress report for April 1993 through September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Ceramic Technology Project was originally developed by the Department of Energy`s Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS`s Materials Development Program, was developed to meet the ceramic technology requirements of the OTS`s automotive technology programs. During the course of the Ceramic Technology Project, remarkable progress has been made in the development of reliable structural ceramics. However, further work is needed to reduce the cost of ceramics to facilitate their commercial introduction, especially in the highly cost-sensitive automotive market. The work described in this report is organized according to the following WBS project elements: Project Management and Coordination; Materials and Processing; Materials Design Methodology; Data Base and Life Prediction; and Technology Transfer. This report includes contributions from all currently active project participants. Separate abstracts were prepared for the 47 projects reported here.

  4. Advanced Blade Manufacturing Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  5. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  6. Contracting and project strategy to reduce the costs

    International Nuclear Information System (INIS)

    Moum, I.O.; Mosbergvik, O.A.

    1995-01-01

    The Norwegian oil industry has developed and grown to a significant size from the 1970's through the 80's, and numerous large fields were developed under a business environment with high oil prices. The technological challenges were significant, but the expectation of high volumes of produced oil and increasing oil prices, secured the funding for development of these large fields. Today this situation is dramatically changed, and the low oil price alone would make it uneconomic to develop the new fields. In addition to low oil prices, people are now also facing smaller reservoirs, deeper water and more sever environmental conditions. The general competitiveness of the Norwegian Continental Shelf is challenged. Many initiatives have been launched in Norway to support the necessary improvements in business performance. The Norwegian oil and gas industry together with the authorities have through 1994 worked together in the NORSOK initiative to identify means to save 40--50% in cost and time for development of new fields. The industry has developed new technology. The authorities have been addressing the fiscal conditions and general framework for the oil companies, and several areas of improvement have been identified and to some degree implemented by the operators. The most important improvements are probably those that are directly implemented in actual development projects, and Statoil/Kvaerner have together some joint experiences that can illustrate how such ideas successfully can be implemented

  7. Energy Storage and Distributed Energy Generation Project, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  8. The Greenland Analogue Project. Yearly Report 2009

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    the parameters and processes needed to achieve a realistic understanding of how an ice sheet may impact a deep repository, and will provide measurements, observations and data that may significantly improve our safety assessments and risk analyses of glaciation scenarios. The project includes three sub-projects (A.C) with specific individual objectives, which collectively aim at contributing knowledge and input to the overall project aim. Figure 1.1 gives an overview of the different aspects of the three GAP sub-projects. The purpose of subdividing the project is that insights and data obtained from the different sub-projects constitute self-consistent data sets, which will be tested and implemented within the individual sub-projects. The overall idea is that the results of all sub-projects used and analyzed together will result in large synergistic effects for the understanding of hydrological conditions during glacial periods. That is also the reason why all sub-projects are performed within the same geographical area (see Figure 1.2). Finally, the GAP project will contribute to a three dimensional process understanding of a glaciated environment by obtaining an integrated view of ice sheet hydrology and groundwater flow and chemistry (Figure 1.1). This report was produced by the GAP team members and presents the outcome of the activities within the GAP during 2009

  9. The Greenland Analogue Project. Yearly Report 2009

    International Nuclear Information System (INIS)

    2010-12-01

    the parameters and processes needed to achieve a realistic understanding of how an ice sheet may impact a deep repository, and will provide measurements, observations and data that may significantly improve our safety assessments and risk analyses of glaciation scenarios. The project includes three sub-projects (A.C) with specific individual objectives, which collectively aim at contributing knowledge and input to the overall project aim. Figure 1.1 gives an overview of the different aspects of the three GAP sub-projects. The purpose of subdividing the project is that insights and data obtained from the different sub-projects constitute self-consistent data sets, which will be tested and implemented within the individual sub-projects. The overall idea is that the results of all sub-projects used and analyzed together will result in large synergistic effects for the understanding of hydrological conditions during glacial periods. That is also the reason why all sub-projects are performed within the same geographical area (see Figure 1.2). Finally, the GAP project will contribute to a three dimensional process understanding of a glaciated environment by obtaining an integrated view of ice sheet hydrology and groundwater flow and chemistry (Figure 1.1). This report was produced by the GAP team members and presents the outcome of the activities within the GAP during 2009

  10. TMI-2 Vessel Investigation Project integration report

    International Nuclear Information System (INIS)

    Wolf, J.R.; Rempe, J.L.; Stickler, L.A.; Korth, G.E.; Diercks, D.R.; Neimark, L.A.; Akers, D.W.; Schuetz, B.K.; Shearer, T.L.; Chavez, S.A.; Thinnes, G.L.; Witt, R.J.; Corradini, M.L.; Kos, J.A.

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel's condition after the accident

  11. TMI-2 Vessel Investigation Project integration report

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, J. R.; Rempe, J. L.; Stickler, L. A.; Korth, G. E.; Diercks, D. R.; Neimark, L. A.; Akers, D W; Schuetz, B. K.; Shearer, T L; Chavez, S. A.; Thinnes, G. L.; Witt, R. J.; Corradini, M L; Kos, J. A. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel`s condition after the accident.

  12. 76 FR 39474 - Monthly Median Cost of Funds Reporting, and Publication of Cost of Funds Indices

    Science.gov (United States)

    2011-07-06

    ... Semiannual Cost of Funds Index (SCOF), and other related cost of funds ratios currently published monthly in... discussed in this notice, please contact Jim Caton, Managing Director--Economic and Industry Analysis, at... Thrift Financial Report (TFR): \\2\\ \\2\\ Copies of the reporting forms and instructions for the TFR (OMB No...

  13. Salt repository project closeout status report

    International Nuclear Information System (INIS)

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE's) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs

  14. Summary Report for Capsule Dry Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    JOSEPHSON, W S

    2003-09-04

    There are 1.936 cesium (Cs) and strontium (Sr) capsules stored in pools at the Waste Encapsulation and Storage Facility (WESF). These capsules will be moved to dry storage on the Hanford Site as an interim measure to reduce risk. The Cs/Sr Capsule Dry Storage Project (CDSP) is conducted under the assumption the capsules will eventually be moved to the repository at Yucca Mountain, and the design criteria include requirements that will facilitate acceptance at the repository. The storage system must also permit retrieval of capsules in the event vitrification of the capsule contents is pursued. A cut away drawing of a typical cesium chloride (CsCI) capsule and the capsule property and geometry information are provided in Figure 1.1. Strontium fluoride (SrF{sub 2}) capsules are similar in design to CsCl capsules. Further details of capsule design, current state, and reference information are given later in this report and its references. Capsule production and life history is covered in WMP-16938, Capsule Characterization Report for Capsule Dry Storage Project, and is briefly summarized in Section 5.2 of this report.

  15. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects

    Science.gov (United States)

    1997-02-01

    The General Accounting Office (GAO) was requested to assess the effectiveness of the Federal Highway Administration's (FHWA's) oversight of the costs of large-dollar highway and bridge projects (those with a total estimated cost of over $100 million)...

  16. Alternate bidding strategies for asphalt and concrete pavement projects utilizing life cycle cost analysis (LCCA).

    Science.gov (United States)

    2012-07-01

    Recent changes in pavement materials costs have impacted the competitive environment relative to the : determination of the most cost effective pavement structure for a specific highway project. In response, State : highway agencies have renewed thei...

  17. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  18. Nuclear Safety Project. Annual report 1986

    International Nuclear Information System (INIS)

    1987-09-01

    The annual report 1986 is a detailed description of work within the Nuclear Safety Project performed in 1986 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes individual research activities on dynamic loads and strains of reactor components under accident conditions, fuel behaviour under accident conditions, investigation and control of LWR core-meltdown accidents, improvement of fission product retention and reduction of radiation exposure, and on behaviour, impact and removal of released pollutants. (DG)

  19. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    Science.gov (United States)

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  20. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  1. Project - GEDEPEON activity report 2001-2004

    International Nuclear Information System (INIS)

    Delpech, Marc; Le Brun, Christian; Leray, S.; Tassan-Got, Laurent; Junquera, T.; Barreau, G.; Gunsing, F.; Letourneau, Alain; Bringer, Olivier; Chabod, Sebastien; Foucher, Yann; Ridikas, Danas; Toussaint, Jean-Christian; Veyssiere, Christian; Faust, Herbert; Mutti, Paolo; Al Mahamid, Ilham; Blandin, Christophe; Breaud, Stephane; Chartier, Frederic; Brissot, R.; Kirchner, Thomas; Latge, Christian; Varaine, F.; Courouau, Jean-Louis; Maitre, Alexandre; Gachon, J.C.; Fiorani, J.; Ghetta, Veronique; Balbaud-Celerier, Fanny; Martinelli, L.; Lone Sang, S.; Ngomsik, A.; Terlain, A.; Sanchez, S.; Picard, G.; Gorse, D.; Auger, T.; Guerin, S.; Lorang, G.; Majimel, J.; Pastol, J.L.; Russier, V.; Dupeux, M.; Ghetta, V.; Vogt, J.-B.; Legris, A.; Serre, I.; Wolski, Krzysztof; Heuer, D.; Meplan, O.; Sanchez, Sylvie; Picard, Gerard

    2005-04-01

    This report presents activities and publications within the frame of GEDEON (Management of wastes by new options) and GEDEPEON (Management of wastes and energy production by new options), two research actions performed in collaboration by the CEA, CNRS, EDF and Framatome, and which mainly addressed accelerator-driven systems (ADS) at the beginning, and then transmutation systems (such as ADS) and innovating systems with transmutation capacities and natural resource saving (GFR of gas fast reactor, MSR or molten salt reactor, and so on). Thus this report contains brief presentations of researches related to the following topics: nuclear data (spallation, spallation over 200 keV, nuclear data for neutron energies lower than 20 MeV), physics of sub-critical reactors, spallation targets and materials (the Megapie project, liquid metals and corrosion for spallation target), linear accelerators for a hybrid system, studies of innovating systems, systems and scenarios, pyrochemical processes

  2. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  3. Fast Breeder Project status report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    A compilation of the papers read at the Status Report of the Fast Breeder Project at the Karlsruhe Nuclear Research Center on March 26, 1974 is presented. The first papers present a general survey of the present state of research and development work performed by the German, Belgian, and Netherlands research centers on the SNR 300 Prototype Fast Breeder Reactor (Kalkar Nuclear Power Station), on the SNR follow-on program, alternative fuels and coolants and basic problems, on work performed by industry with respect to the licensing procedure and construction of the SNR 300, and on commissioning and the planned conversion of KNK, the Compact Sodium Cooled Nuclear Reactor. The detailed papers deal with results elaborated at the institutes of GfK Karlsruhe, SCK/CEN Mol, RCN Petten, and TNO Apeldoorn. Most of these efforts have been concentrated upon fuel pin and materials development and on the physics and safety of fast reactors. The status report concludes with a reference to the future program under the Project. (U.S.)

  4. Report on TRISTAN Project. September, 1996

    International Nuclear Information System (INIS)

    1996-09-01

    This is the final report on TRISTAN Project. It passed 15 years since the construction was begun on 1981, and 10 years since the experiment was begun. At first, it was gathered a lot of interests in the world as the highest e(+)e(-) collider, and conducted an experiment aiming at discovering top quark, an experiment on generation determination by neutrino, and so forth. Regretfully, it was found that it had unsufficient energy to reach the top quark. However, it obtained many important discovery on quark and gluon and a lot of interesting results used with an energy with the most remarkable weak electric interaction. As an accelerator side, a success of the first actual accelerator using the superconducting whole in the world showed the level of the Japanese technology to the world and brought a large confidence for future development. TRISTAN will be executed its large modification by 1998, to change B-factory newly. In this report, the following contents are described; 1) Outlines of TRISTAN Project, 2) Research Results (Precision investigation of standard theory and discovery of new phenomenon forecast thereby, Survey on new phenomenon beyond the standard theory, As photon and photon collider, and development of experimental techniques), 3)TRISTAN and accelerator science, and others. (G.K.)

  5. Status Report: Mathematics Curriculum-Development Projects Today

    Science.gov (United States)

    Arithmetic Teacher, 1972

    1972-01-01

    Brief reports on the Cambridge Conference on School Mathematics, Comprehensive School Mathematics Program, Computer-Assisted Instruction Projects at Stanford, Individually Prescribed Instruction Project, The Madison Project, Mathematics/Science Learning System, MINNEMAST, and School Mathematics Study Group. (MM)

  6. Nuclear energy: the real cost. A special report

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, K.; Marshall, R.; Sweet, C.; Prior, M.; Welsh, I.; Bunyard, P.; Goldsmith, E.; Hildyard, N.; Jeffery, J.W. (Committee for the Study of the Economics of Nuclear Electricity, Camelford (UK))

    1981-12-01

    This report on the discussions within a small group of academics falls under the headings: chairman's foreword; summary and recommendations; the government's nuclear power programme and its implications; the CEGB's planning record; the past performance of Britain's nuclear power stations - a guide for the future (query); nuclear power -early uncertainties; historic costs - 'the fraud inherent in all inflationary finance'; current cost accounting; fuel costs - coal stays steady, nuclear rises; net effective cost and the rationale for nuclear power; reinterpreting net effective costs; other considerations; conclusions and recommendations; references.

  7. Analysis of the production and transaction costs of forest carbon offset projects in the USA.

    Science.gov (United States)

    Galik, Christopher S; Cooley, David M; Baker, Justin S

    2012-12-15

    Forest carbon offset project implementation costs, comprised of both production and transaction costs, could present an important barrier to private landowner participation in carbon offset markets. These costs likewise represent a largely undocumented component of forest carbon offset potential. Using a custom spreadsheet model and accounting tool, this study examines the implementation costs of different forest offset project types operating in different forest types under different accounting and sampling methodologies. Sensitivity results are summarized concisely through response surface regression analysis to illustrate the relative effect of project-specific variables on total implementation costs. Results suggest that transaction costs may represent a relatively small percentage of total project implementation costs - generally less than 25% of the total. Results also show that carbon accounting methods, specifically the method used to establish project baseline, may be among the most important factors in driving implementation costs on a per-ton-of-carbon-sequestered basis, dramatically increasing variability in both transaction and production costs. This suggests that accounting could be a large driver in the financial viability of forest offset projects, with transaction costs likely being of largest concern to those projects at the margin. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  9. Project financing knits parts of costly LNG supply chain

    International Nuclear Information System (INIS)

    Minyard, R.J.; Strode, M.O.

    1997-01-01

    The supply and distribution infrastructure of an LNG project requires project sponsors and LNG buyers to make large, interdependent capital investments. For a grassroots project, substantial investments may be necessary for each link in the supply chain: field development; liquefaction plant and storage; ports and utilities; ships; receiving terminal and related facilities; and end-user facilities such as power stations or a gas distribution network. The huge sums required for these projects make their finance ability critical to implementation. Lenders have become increasingly comfortable with LNG as a business and now have achieved a better understanding of the risks associated with it. Raising debt financing for many future LNG projects, however, will present new and increasingly difficult challenges. The challenge of financing these projects will be formidable: political instability, economic uncertainty, and local currency volatility will have to be recognized and mitigated. Described here is the evolution of financing LNG projects, including the Rasgas LNG project financing which broke new ground in this area. The challenges that lie ahead for sponsors seeking to finance future projects selling LNG to emerging markets are also discussed. And the views of leading experts from the field of project finance, specifically solicited for this article, address major issues that must be resolved for successful financing of these projects

  10. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  11. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  12. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  13. Study to establish cost projections for production of Redox chemicals

    Science.gov (United States)

    Walther, J. F.; Greco, C. C.; Rusinko, R. N.; Wadsworth, A. L., III

    1982-01-01

    A cost study of four proposed manufacturing processes for redox chemicals for the NASA REDOX Energy Storage System yielded favorable selling prices in the range $0.99 to $1.91/kg of chromic chloride, anhydrous basis, including ferrous chloride. The prices corresponded to specific energy storage costs from under $9 to $17/kWh. A refined and expanded cost analysis of the most favored process yielded a price estimate corresponding to a storage cost of $11/kWh. The findings supported the potential economic viability of the NASA REDOX system.

  14. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  15. Parent Early Evaluation of Kids: PEEK Outreach Training Project. Final Report.

    Science.gov (United States)

    Squires, Jane; Twombly, Liz; Yockelson, Sue

    This report describes achievements and activities of the Parent Early Evaluation of Kids (PEEK) Outreach Project at the University of Oregon. This project focused on assisting state agencies, regional and tribal entities, and local health and education programs to develop comprehensive, low-cost systems for child-find and referral. Rural and inner…

  16. Prototype Rail Crossing Violation Warning Application Project Report.

    Science.gov (United States)

    2017-09-05

    This report is the Project Report for the Rail Crossing Violation Warning (RCVW) safety application developed for the project on Rail Crossing Violation Warning Application and Infrastructure Connection, providing a means for equipped connected vehic...

  17. Overview of NREL Distribution Grid Integration Cost Projects

    Energy Technology Data Exchange (ETDEWEB)

    Horowitz, Kelsey A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ding, Fei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Mather, Barry A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Palmintier, Bryan S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Denholm, Paul L [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-12

    This presentation was given at the 2017 NREL Workshop 'Benchmarking Distribution Grid Integration Costs Under High Distributed PV Penetrations.' It provides a brief overview of recent and ongoing NREL work on distribution system grid integration costs, as well as challenges and needs from the community.

  18. Facility Interface Capability Assessment (FICA) project report

    International Nuclear Information System (INIS)

    Pope, R.B.; MacDonald, R.R.; Viebrock, J.M.; Mote, N.

    1995-09-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from commercial facilities. The objective of the Facility Interface Capability Assessment (FICA) project was to assess the capability of each commercial spent nuclear fuel (SNF) storage facility, at which SNF is stored, to handle various SNF shipping casks. The purpose of this report is to present and analyze the results of the facility assessments completed within the FICA project. During Phase 1, the data items required to complete the facility assessments were identified and the database for the project was created. During Phase 2, visits were made to 122 facilities on 76 sites to collect data and information, the database was updated, and assessments of the cask-handling capabilities at each facility were performed. Each assessment of cask-handling capability contains three parts: the current capability of the facility (planning base); the potential enhanced capability if revisions were made to the facility licensing and/or administrative controls; and the potential enhanced capability if limited physical modifications were made to the facility. The main conclusion derived from the planning base assessments is that the current facility capabilities will not allow handling of any of the FICA Casks at 49 of the 122 facilities evaluated. However, consideration of potential revisions and/or modifications showed that all but one of the 49 facilities could be adapted to handle at least one of the FICA Casks. For this to be possible, facility licensing, administrative controls, and/or physical aspects of the facility would need to be modified

  19. Facility Interface Capability Assessment (FICA) project report

    Energy Technology Data Exchange (ETDEWEB)

    Pope, R.B. [ed.] [Oak Ridge National Lab., TN (United States); MacDonald, R.R. [ed.] [Civilian Radioactive Waste Management System, Vienna, VA (United States); Viebrock, J.M.; Mote, N. [Nuclear Assurance Corp., Norcross, GA (United States)

    1995-09-01

    The US Department of Energy`s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing the Civilian Radioactive Waste Management System (CRWMS) to accept spent nuclear fuel from commercial facilities. The objective of the Facility Interface Capability Assessment (FICA) project was to assess the capability of each commercial spent nuclear fuel (SNF) storage facility, at which SNF is stored, to handle various SNF shipping casks. The purpose of this report is to present and analyze the results of the facility assessments completed within the FICA project. During Phase 1, the data items required to complete the facility assessments were identified and the database for the project was created. During Phase 2, visits were made to 122 facilities on 76 sites to collect data and information, the database was updated, and assessments of the cask-handling capabilities at each facility were performed. Each assessment of cask-handling capability contains three parts: the current capability of the facility (planning base); the potential enhanced capability if revisions were made to the facility licensing and/or administrative controls; and the potential enhanced capability if limited physical modifications were made to the facility. The main conclusion derived from the planning base assessments is that the current facility capabilities will not allow handling of any of the FICA Casks at 49 of the 122 facilities evaluated. However, consideration of potential revisions and/or modifications showed that all but one of the 49 facilities could be adapted to handle at least one of the FICA Casks. For this to be possible, facility licensing, administrative controls, and/or physical aspects of the facility would need to be modified.

  20. Steam Generator Group Project. Annual report, 1982

    International Nuclear Information System (INIS)

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided

  1. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  2. Mock Site Licensing Demonstration Project. Final report

    International Nuclear Information System (INIS)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities

  3. Energy tariff project - Latvia. Summary report

    International Nuclear Information System (INIS)

    Harne, N.J.

    1996-05-01

    Latvia has only a few indigenous energy resources that are concentrated on hydro-power, wood and peat. The country is therefore strongly dependant on imports of natural gas, oil, coal and electricity. After independence the supply of natural gas, oil and electricity were organised by three state owned joint-stock companies, Latvijas Gaze, Latvijas Nafta and Latvenergo. Partial privatisation of the gas and oil companies has been decided by the Latvian government but so far not implemented. Two types of models have been used within the Energy Tariff Project: The EFOM model that was developed and implemented for Latvia as a part of the EURIO project has been adapted to describe the long term reactions for the electricity and district heating sectors; A system of Customer Calculation Sheets for the analysis of consumer expenditure and utility revenue. The optimization model for the electricity and CHP system is also used to analyze the impact of gas tariffs for the electricity and district heating sector within geographical or institutional limits. In this report the following regions are specified: City of Riga; Other district heating areas; Rest of Latvia. The Danish tariff structure for natural gas was reviewed. The present structure is presently market orientated with direct links to the price movements of alternative fuels for all customer groups. (EG) 50 refs

  4. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  5. Regional Assessment of Supplementation Project. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year`s objectives and recommendations for future tasks are contained in this report.

  6. Report for the NGFA-5 project.

    Energy Technology Data Exchange (ETDEWEB)

    Jaing, C; Jackson, P; Thissen, J; Wollard, J; Gardner, S; McLoughlin, K

    2011-11-15

    The objective of this project is to provide DHS a comprehensive evaluation of the current genomic technologies including genotyping, TaqMan PCR, multiple locus variable tandem repeat analysis (MLVA), microarray and high-throughput DNA sequencing in the analysis of biothreat agents from complex environmental samples. To effectively compare the sensitivity and specificity of the different genomic technologies, we used SNP TaqMan PCR, MLVA, microarray and high-throughput illumine and 454 sequencing to test various strains from B. anthracis, B. thuringiensis, BioWatch aerosol filter extracts or soil samples that were spiked with B. anthracis, and samples that were previously collected during DHS and EPA environmental release exercises that were known to contain B. thuringiensis spores. The results of all the samples against the various assays are discussed in this report.

  7. Fermilab D-0 Experimental Facility: Energy conservation report and mechanical systems design optimization and cost analysis study

    International Nuclear Information System (INIS)

    Krstulovich, S.F.

    1987-01-01

    This report is developed as part of the Fermilab D-0 Experimental Facility Project Title II Design Documentation Update. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis

  8. The Greenland analogue project. Yearly report 2010

    Energy Technology Data Exchange (ETDEWEB)

    Harper, J; Brinkerhoff, D; Johnson, J [University of Montana, Missoula (United States); Ruskeeniemi, T; Engstroem, J; Kukkonen, I [Geological Survey of Finland (Finland); and others

    2012-04-15

    A four-year field and modelling study of the Greenland ice sheet and subsurface conditions, Greenland Analogue Project (GAP), has been initiated collaboratively by SKB, Posiva and NWMO to advance the understanding of processes associated with glaciation and their impact on the long-term performance of a deep geological repository. The study site encompasses a land terminus portion of the Greenland ice sheet, east of Kangerlussuaq, and is in many ways considered to be an appropriate analogue of the conditions that are expected to prevail in much of Canada and Fennoscandia during future glacial cycles. The project begins in 2009 and is scheduled for completion in 2012. Our current understanding of the hydrological, hydrogeological and hydrogeochemical processes associated with cold climate conditions and glacial cycles, and their impact on the long-term performance of deep geological repositories for spent nuclear fuel, will be significantly improved by studying a modern analogue. The GAP will conduct the first in situ investigations of some of the parameters and processes needed to achieve a better understanding of how an ice sheet may impact a deep repository, and will provide measurements, observations and data that may significantly improve our safety assessments and risk analyses of glaciation scenarios. This report was produced by the GAP team members and presents an overview of the activities within the GAP during the interval January 1 to December 31, 2010, as well as research results obtained during this time frame. Research for the GAP is ongoing, and additional results related to the data presented here may become available in the future and will be presented in subsequent annual reports. (orig.)

  9. The Greenland analogue project. Yearly report 2010

    International Nuclear Information System (INIS)

    Harper, J.; Brinkerhoff, D.; Johnson, J.; Ruskeeniemi, T.; Engstroem, J.; Kukkonen, I.

    2012-04-01

    A four-year field and modelling study of the Greenland ice sheet and subsurface conditions, Greenland Analogue Project (GAP), has been initiated collaboratively by SKB, Posiva and NWMO to advance the understanding of processes associated with glaciation and their impact on the long-term performance of a deep geological repository. The study site encompasses a land terminus portion of the Greenland ice sheet, east of Kangerlussuaq, and is in many ways considered to be an appropriate analogue of the conditions that are expected to prevail in much of Canada and Fennoscandia during future glacial cycles. The project begins in 2009 and is scheduled for completion in 2012. Our current understanding of the hydrological, hydrogeological and hydrogeochemical processes associated with cold climate conditions and glacial cycles, and their impact on the long-term performance of deep geological repositories for spent nuclear fuel, will be significantly improved by studying a modern analogue. The GAP will conduct the first in situ investigations of some of the parameters and processes needed to achieve a better understanding of how an ice sheet may impact a deep repository, and will provide measurements, observations and data that may significantly improve our safety assessments and risk analyses of glaciation scenarios. This report was produced by the GAP team members and presents an overview of the activities within the GAP during the interval January 1 to December 31, 2010, as well as research results obtained during this time frame. Research for the GAP is ongoing, and additional results related to the data presented here may become available in the future and will be presented in subsequent annual reports. (orig.)

  10. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  11. Parents and the High Cost of Child Care: 2012 Report

    Science.gov (United States)

    Child Care Aware of America, 2012

    2012-01-01

    "Parents and the High Cost of Child Care: 2012 Report" presents 2011 data reflecting what parents pay for full-time child care in America. It includes average fees for both child care centers and family child care homes. Information was collected through a survey conducted in January 2012 that asked for the average costs charged for…

  12. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  13. Financial Reporting and Cost Analysis Manual for Day Care Centers, Head Start, and Other Programs.

    Science.gov (United States)

    Bedger, Jean E.; And Others

    This manual is designed to provide fundamental directions for systematic financial reporting and cost analysis for the administrators, accountants, bookkeepers, and staff of day care, Project Head Start, and other programs. The major aims of the manual are to induce day care directors to adopt uniform bookkeeping procedures and to analyze costs…

  14. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  15. OPTIMIZATION OF TIMES AND COSTS OF PROJECT OF HORIZONTAL LAMINATOR PRODUCTION USING PERT/CPM TECHNICAL

    Directory of Open Access Journals (Sweden)

    Fernando Henrique Lermen

    2016-09-01

    Full Text Available The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.

  16. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  17. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  18. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  19. Healthcare Cost and Utilization Project (HCUP) - National Inpatient Sample

    Data.gov (United States)

    U.S. Department of Health & Human Services — 2001 forward. The National (Nationwide) Inpatient Sample (NIS) is part of a family of databases and software tools developed for the Healthcare Cost and Utilization...

  20. Project monitor. Final report. [Allegheny County, PA

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, P.Y.; Beck, P.; Doctors, S.I.

    1979-04-27

    Results are reported of a study of consumers' energy attitudes and behavior. Household consumers and small business consumers (both retail and manufacturing) responded to the survey, but only the household results are reported. The study sought to understand energy-related behavior at the level where the various components of energy policy intersect. Attempts are made to attain this goal by determining the extent to which various properties of the individuals and firms are associated with various amounts of conservation. A representative sample of the adult population in Allegheny County, Pennsylvania was interviewed. Part I introduces the measures of household conservation to be used in the survey. Part II analyzes each of the types of energy conservation - general, winterization, heating, cooling, appliance, transportation, and electricity reductions - and relates them to demographic, situation, attitudinal, and perceptual variables in the household sample. Part III deals with the impacts of Project Pacesetter and the United Mine Workers' strike against the coal operators - particularly, the impact of the coal strike on household residents of Allegheny County. Part IV summarizes the findings and uses them for recommendations regarding energy conservation policy. Additional data are presented in 4 appendices. (MCW)

  1. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  2. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  3. Final project report for NEET pulsed ion beam project

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, S. O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-11

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurement of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.

  4. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  5. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  6. Computerized management report system for monitoring manpower and cost

    International Nuclear Information System (INIS)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures

  7. Low-cost rural surface alternatives : demonstration project.

    Science.gov (United States)

    2015-06-01

    The goals of this project were to implement several stabilization methods for preventing or mitigating freeze-thaw damage to : granular surfaced roads and identify the most effective and economical methods for the soil and climate conditions of Iowa....

  8. Cost estimate modeling of transportation management plans for highway projects.

    Science.gov (United States)

    2012-05-01

    Highway rehabilitation and reconstruction projects frequently cause road congestion and increase safety concerns while limiting access for road users. State Transportation Agencies (STAs) are challenged to find safer and more efficient ways to renew ...

  9. 13 CFR 120.882 - Eligible Project costs for 504 loans.

    Science.gov (United States)

    2010-01-01

    ... financing including points, fees and interest. (e) If the project involves expansion of a small business... expansion of a small business concern” includes any project that involves the acquisition, construction or... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Eligible Project costs for 504...

  10. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  11. Progress report on the investigation of nuclear plant costs

    International Nuclear Information System (INIS)

    Kent, G.F.

    1987-01-01

    Over the past few years, many studies have been performed in an effort to understand, evaluate, and explain the reasons for the substantial increases in nuclear plant costs, as well as for the divergence between predicted and actual costs. Concerns regarding these cost increases is shared by utility owners, engineer/constructors, and public utility commissions. The future use of nuclear power depends on the ability of the industry to control these costs while maintaining safety. Stone and Webster Engineering Corporation (SWEC) has responded to this concern by initiating an internal study to evaluate, quantify, and explain the factors influencing this cost growth. Previously, a conceptual approach was presented in which three explanatory variables or factors were used as surrogates for the many variables that affected plant cost. This paper presents a progress report of that continuing study

  12. Electricity transmission congestion costs: A review of recent reports

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-10-01

    Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

  13. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  14. Stochastic project networks temporal analysis, scheduling and cost minimization

    CERN Document Server

    Neumann, Klaus

    1990-01-01

    Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does no...

  15. Kansas Advanced Semiconductor Project: Final Report

    International Nuclear Information System (INIS)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-01-01

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  16. Cost estimation in software engineering projects with web components development

    Directory of Open Access Journals (Sweden)

    Javier de Andrés

    2015-01-01

    Full Text Available Existen multitud de modelos propuestos para la predicción de co stes en proyectos de software, al gunos orientados específicamen te para proyectos Web. Este trabajo analiza si los modelos específicos para proyectos Web están justifi cados, examinando el comportami ento diferencial de los costes entre proyectos de desarrollo softwar e Web y no Web. Se analizan dos aspectos del cálculo de costes: las deseconomías de escala, y el im pacto de algunas características de estos proyectos que son utilizadas como cost drivers. Se en uncian dos hipótesis: (a en estos proyect os las deseconomías de escala so n mayores y (b el incremento de coste que provocan los cost dr ivers es menor para los proyectos Web. Se contrastaron estas hipótesis a nalizando un conjunto de proyectos reales. Los resultados sugie ren que ambas hipótesis se cumplen. Por lo tanto, la principal contribu ción a la literatura de esta inv estigación es que el desarrollo de modelos específicos para los proyectos Web está justificado.

  17. Final Report for NIREC Renewable Energy Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Borland, Walt [Nevada Institute for Renewable Energy Commercialization (NIREC), Las Vegas, NV (United States)

    2017-05-02

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption of renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.

  18. FY2011 Annual Report for NREL Energy Storage Projects

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  19. A comparison of high velocity systems on rail. Cooperation project. Pt. 2/A. Final report. A method to evaluate operating costs. Vergleich von spurgefuehrten Hochgeschwindigkeitssystemen. Kooperationsprojekt. T. 2/A. Abschlussbericht. Comparaison de systemes de transport guide a grande vitesse. Projet de cooperation. Pt. 2/A. Rapport final. Methode zur Bestimmung der Betriebskosten. Methode de determination des couts d'exploitation

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    In this German-French cooperation project a comparison between the high speed Intercity Express (ICE), the high speed train TGV (train a grande vitesse) and the maglev rapid transit system Transrapid is drawn. Investment costs for infrastructure and rail network and operating costs, ie costs for the operational management, maintenance and capital cost are compared. For this a method has been worked out for the calculation of operating cost ratios and a model has been developed for writing operating programmes and for the evaluation of operating costs. (RHM).

  20. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Russell, E.W.; Clarke, W. [Lawrence Livermore National Lab., CA (United States); Domian, H.A. [Babcock and Wilcox Co., Lynchburg, VA (United States); Madson, A.A. [Kaiser Engineers California Corp., Oakland, CA (United States)

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B&S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs.

  1. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Russell, E.W.; Clarke, W.; Domian, H.A.; Madson, A.A.

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B ampersand S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs

  2. Costing the EPR Project Using the Real Options Method

    International Nuclear Information System (INIS)

    Epaulard, Anne; Gallon, Stephane

    2001-01-01

    Real options theory makes it possible to cost investments which offer flexibility but whose returns are uncertain, such as the construction in 2000 of an EPR prototype; this prototype will enable the European pressurised-water reactor (EPR) to be used to renew EDF's nuclear power stations in 2020 (flexibility) but its economic worth will then depend on the cost of the competing gas-fired power plants (uncertain return). Options theory shows that investing in EPR technology in 2000 provides sufficient flexibility in 2020 to be considered cost-effective, even though use of EPRs is unlikely by that date. The investment made in 2000 to develop EPR technology therefore actually plays the part of an option or, in other words, insurance (against the risk of high gas prices)

  3. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  4. Cost-Benefit Analysis for Investment Decisions: Chapter 16 (Cost-Benefit Analysis of Transportation Projects)

    OpenAIRE

    Glenn Jenkins; Chun-Yan Kuo; Arnold C. Harberger

    2011-01-01

    This chapter will focus on the problems of evaluating transportation projects in the context of the less-developed countries. Emphasis will be placed on highway projects, because these account for the bulk of transport investments in the developing parts of the world. If a project passes a straight financial test, based on the present value of its cash inflows and outflows, projects would only come if this financial NPV were outweighed by the present value of the project’s various externali...

  5. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  6. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  7. cptnHook - Summer Student Project Report

    CERN Document Server

    Asimakopoulou, Eleni - Myrto

    2015-01-01

    The present is a report of the work that was conducted during my 8-week summer school internship at CERN. The project was centered on the development of an instrumentation tool for the usage of mathematical functions in a scientific application. More specifically, $\\textbf{cptnHook}$ addresses a current issue that arises from the the extensive use of very time-consuming mathematical functions (such as transcendental functions) that results in them accounting for a big portion of their run-time. It is believed that the problem can be addressed with ad-hoc approximations of mathematical functions, for which a clear overview of the usage of the functions in the program is required. $\\textbf{cptnHook}$ approaches this problem by providing a measurement of the use of mathematical functions in a program by hooking into the machine code and probing the arguments of the functions, without modifying the application's source code. The outputs of the tool are provided in ROOT format for further on analysis.

  8. Mid term report for IDEAL project

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    The main objective of this report is to describe the progresses in the WP4 achived at the mid term of the IDEAL project. The main objective of work package 4 is threefold: Firstly, obtaining a reliable forecast of the residual stresses and strains directly from the casting simulation. For this pu...... of the casting simulation, the heat treatment simulation as well as a possible subsequent load analysis together and thereby addressing the entire CAE-chain........ For this purpose the process simulation must include a thorough thermomechanical analysis itself. This is already possible in the FV-based process optimisation tool MAGMAsoft, although it is further being developed in the work package with respect to the constitutive description of the aluminium parts at high...... temperatures. Secondly, establishing a reliable model for the thermomechanical conditions during the subsequent heat treatment of the cast aluminium parts. In this process, several approaches involving both simple visco-plastic models as well as more complex unified models are taken. Thirdly, coupling...

  9. Enewetak radiological support project. Final report

    International Nuclear Information System (INIS)

    Friesen, B.

    1982-09-01

    From 1972 through 1980, the Department of Energy acted in an advisory role to the Defense Nuclear Agency during planning for and execution of the cleanup of Enewetak Atoll. The Nevada Operations Office of the Department of Energy was responsible for the radiological characterization of the atoll and for certification of radiological condition of each island upon completion of the project. In-situ measurements of gamma rays emitted by americium-241 were utilized along with wet chemistry separation of plutonium from soil samples to identify and delineate surface areas requiring removal of soil. Military forces removed over 100,000 cubic yards of soil from the surface of five islands and deposited this material in a crater remaining from the nuclear testing period. Subsurface soil was excavated and removed from several locations where measurements indicated the presence of radionuclides above predetermined criteria. The methodologies of data acquisition, analysis and interpretation are described and detailed results are provided in text, figures and microfiche. The final radiological condition of each of 43 islets is reported

  10. Borehole project - Final report of phase 3

    International Nuclear Information System (INIS)

    Pusch, R.; Ramqvist, G.

    2008-03-01

    The report describes borehole plugging techniques for use in deep boreholes extending from the ground surface, and construction and placement of plugs in holes of different lengths and orientations bored from the repository rooms. The principle employed is the one proposed in earlier phases of the project, i.e. to tightly seal those parts of boreholes where the rock has few fractures and a low hydraulic conductivity, and filling of those parts that intersect water-bearing fracture zones with physically stable material that does not need to be low-permeable. Four methods for tight plugging have been identified and tested and a technique has been found for filling boreholes that are intersected by fracture zones. The upper end of boreholes extending from the ground surface needs a 'mechanical' seal for which copper metal and concrete work well. The experience from plugging of a 550 m deep borehole at Olkiluoto (OL-KR24) has been compiled and plans worked out for sampling and testing of contacting clay and concrete in this hole and in short holes in the Aespoe URL. (orig.)

  11. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  12. 523 factors influencing direct costs dynamics of building projects

    African Journals Online (AJOL)

    Osondu

    2013-08-16

    Aug 16, 2013 ... effect of the direct cost variation factors (p-values between 0.365 and 0.930). Construction, resources, and performance factors are the most significant of the groups (MS range = 3.66 to 4.33), though no .... financial control on site ranked first and second ... order according to the consultants were, inflation.

  13. 24 CFR 954.303 - Eligible project costs.

    Science.gov (United States)

    2010-04-01

    ... meet the applicable new construction standards of the grantee and the Model Energy Code referred to in... more per home) the cost of funding an initial operating deficit reserve, which is a reserve to meet any... only be used to pay operating expenses, reserve for replacement payments, and debt service. Any HOME...

  14. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  15. Offset project report : Cleanit Greenit aerobic composting project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-02-15

    The Cleanit Greenit site is owned and operated by Cleanit Greenit Composting System Inc. and is a composting facility located in Edmonton, Alberta. The facility has an annual processing capacity of 20,000 tonnes of organic waste and was the first in Canada to compost a large variety of industrial by-products containing hydrocarbons, through controlled blending with other wastes and monitoring of moisture, temperature and pH. The composting process turns organic waste material from industrial, commercial and domestic sources into finished projects, thus removing these materials from conditions where treatment and disposal is often difficult, expensive and environmentally harmful. This protocol document covered the diversion of organic residues from landfill for biological decomposition to a condition sufficiently stable for nuisance-free storage and for safe use in land application. A wide variety of organic residues were considered, including agricultural and agri-food residues; the organic portion of municipal solid waste; food wastes; and forestry and landscaping wastes. The document presented information on the Cleanit Greenit project and discussed the calculation of greenhouse gas emission reductions. An appendix that contained the Cleanit Greenit aerobic composting offset project plan was also provided. tabs., figs.

  16. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  17. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  18. Brown Grease to Biodiesel Demonstration Project Report

    Energy Technology Data Exchange (ETDEWEB)

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    Municipal wastewater treatment facilities have typically been limited to the role of accepting wastewater, treating it to required levels, and disposing of its treatment residuals. However, a new view is emerging which includes wastewater treatment facilities as regional resource recovery centers. This view is a direct result of increasingly stringent regulations, concerns over energy use, carbon footprint, and worldwide depletion of fossil fuel resources. Resources in wastewater include chemical and thermal energy, as well as nutrients, and water. A waste stream such as residual grease, which concentrates in the drainage from restaurants (referred to as Trap Waste), is a good example of a resource with an energy content that can be recovered for beneficial reuse. If left in wastewater, grease accumulates inside of the wastewater collection system and can lead to increased corrosion and pipe blockages that can cause wastewater overflows. Also, grease in wastewater that arrives at the treatment facility can impair the operation of preliminary treatment equipment and is only partly removed in the primary treatment process. In addition, residual grease increases the demand in treatment materials such as oxygen in the secondary treatment process. When disposed of in landfills, grease is likely to undergo anaerobic decay prior to landfill capping, resulting in the atmospheric release of methane, a greenhouse gas (GHG). This research project was therefore conceptualized and implemented by the San Francisco Public Utilities Commission (SFPUC) to test the feasibility of energy recovery from Trap Waste in the form of Biodiesel or Methane gas. The research goals are given below: To validate technology performance; To determine the costs and benefits [including economic, socioeconomic, and GHG emissions reduction] associated with co-locating this type of operation at a municipal wastewater treatment plant (WWTP); To develop a business case or model for replication of the

  19. Fiscal 1998 result report on research and development project of regional consortiums (the first year). Research and development of regional consortium energy / Report on development of high-grade and low-cost molds for rubber and plastics; 1998 nendo chiiki consortium energy kenkyu kaihatsu (dai 1 nendo). Gomu plastic yo kohin'i tei cost kanagata no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Discussions were given on quality improvement and cost reduction of heating and forming molds for household rubber, plastics and electronic device parts. This paper summarizes the achievements in fiscal 1998. Verification was made on chromium plated steel and stainless steel molds as to improvement in water repellency of the mold surface by injecting N and F ions, improvement in surface hardness by making the surface into CrN and CrF, and improvement in wear resistance. In order to inject the ions uniformly into the mold surface having irregularities, a high-frequency and high-energy power supply was developed. Development was made on a negative voltage induction pulse power supply taking synchronism with the above pulse power supply and a 50-kV field through device. The design and fabrication thereof have been completed and the trial operation has begun. In order to evaluate mold releasing performance and pollution effect on molds under the same conditions for all makes, a unified evaluation criterion was established. With regard to nitriding and chromation by means of nitrogen ion injection into chromium plated steels under the unified rubber composition, the mold releasing performance and pollution effect were evaluated in terms of economics. Residue of rubber material in a mold has decreased, and metal polluting effect has been improved. Quantitative evaluation was performed successfully by the CCD taken image processing of surface images. (NEDO)

  20. Project Rio Blanco: site restoration. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7,000 foot well in northwestern Colorado. Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975 and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. The activities throughout the restoration period are summarized and the final site status, including the disposition of all project facilities and the status of all project related wells after plug and abandonment and recompletion work are described

  1. Manufacturing Methods and Technology Project Summary Reports

    Science.gov (United States)

    1984-06-01

    cadmium but slightly greater than electroplated cadmium. However, if polution abatement costs are included in the costs for electroplated cadmium, then...filled with tritium, a radioactive gas. As the tritium decays, it releases beta particles which strike and excite the phosphors. Figure 1, causing them

  2. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  3. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  4. Cost estimates for near-term depolyment of advanced traffic management systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, S.S.; Chin, S.M.

    1993-02-15

    The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

  5. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  6. Cost Overruns in Large-scale Transportation Infrastructure Projects

    DEFF Research Database (Denmark)

    Cantarelli, Chantal C; Flyvbjerg, Bent; Molin, Eric J. E

    2010-01-01

    is also considered possible. Non-political explanations are diverse in character, therefore a range of different theories (including rational choice theory and prospect theory), depending on the kind of explanation is considered more appropriate than one all-embracing theory........ Overall, four categories of explanations can be distinguished: technical, economic, psychological, and political. Political explanations have been seen to be the most dominant explanations for cost overruns. Agency theory is considered the most interesting for political explanations and an eclectic theory...

  7. Ice Load Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Timothy J. [DNV GL, Seattle, WA (United States); Brown, Thomas [IFC Engineering, Calgary, AB (Canada); Byrne, Alex [DNV GL, Seattle, WA (United States)

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  8. LYNX community advocacy & service engagement (CASE) project final report.

    Science.gov (United States)

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  9. Marginal abatement cost curves for Heavy Duty Vehicles. Background report

    Energy Technology Data Exchange (ETDEWEB)

    Schroten, A.; Warringa, G.; Bles, M.

    2012-09-15

    Cost curves were calculated for CO2 abatement technologies for Heavy Duty Vehicles. These curves were elaborated for eight different vehicle categories (six categories of truck and two subcategories), as well as for an 'average' truck and bus. Given that cost curves depend very much on underlying assumptions, the MACH model (Marginal Abatement Costs of Heavy duty vehicles) was developed. This model allows users to enter their own assumptions with respect to parameters like fuel prices and cost and lifetime of individual technologies, with the model then generating new cost curves for the various vehicle categories. This background report contains a description of the model and a summary of the results of several model runs.

  10. NREL Energy Storage Projects. FY2014 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, Ahmad [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ban, Chunmei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Burton, Evan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gonder, Jeff [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Grad, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jun, Myungsoo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Keyser, Matt [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kim, Gi-Heon [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Neubauer, Jeremy [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Santhanagopalan, Shriram [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saxon, Aron [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Shi, Ying [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sprague, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tenent, Robert [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wood, Eric [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Yang, Chuanbo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Chao [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Han, Taeyoung [General Motors, Detroit, MI (United States); Hartridge, Steve [CD-adapco, Detroit, MI (United States); Shaffer, Christian E. [EC Power, Aurora, CO (United States)

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  11. Photovoltaic Programme Edition 2007. Summary Report, Project List, Annual Project Reports 2006 (Abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This 2007 edition summary report for the Swiss Federal Office of Energy (SFOE), reports on the work done within the framework of the Swiss Photovoltaics Program in 2006. The document contains 46 abstracts on work done in the photovoltaics area. The subjects reported on in the thin-film photovoltaics sector include advanced processing and characterisation of thin film silicon solar cells, high-rate deposition of micro-crystalline silicon, a new large-area VHF reactor for high-rate deposition of micro-crystalline silicon, the stability of zinc oxide in encapsulated thin film silicon solar cells, spectral photocurrent measurement, roll-to-roll technology for the production of thin film silicon modules, advanced thin film technologies, ultra thin silicon wafer cutting, bifacial thin industrial multi-crystalline silicon solar cells, flexible CIGS solar cells and mini-modules, large-area CIS-based thin-film solar modules and advanced thin-film technologies. In the area of dye-sensitised modules, the following projects are reported on: Dye-sensitised nano-crystalline solar cells, voltage enhancement of dye solar cells and molecular orientation as well as low band-gap and new hybrid device concepts for the improvement of flexible organic solar cells. Other projects reported on include a new PV wave making more efficient use of the solar spectrum, photovoltaic textiles, organic photovoltaic devices, photo-electrochemical and photovoltaic conversion and storage of solar energy, PV modules with antireflex glass, improved integration of PV into existing buildings, the seventh program at the LEEE-TISO, the 'PV enlargement' and 'Performance' programs, efficiency and annual electricity production of PV modules, photovoltaics system technology 2005-2006, an update on photovoltaics in view of the 'ecoinvent' v.2.0 tool and environmental information services for solar energy industries. The contributions to four Swiss IEA PVPS tasks and the Swiss interdepartmental platform for

  12. Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations

    Directory of Open Access Journals (Sweden)

    Hans Lind

    2014-09-01

    Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project.   Keywords: Cost overruns, Infrastructure projects, Policy measures

  13. The Southern Forest Futures Project: technical report

    Science.gov (United States)

    David N. Wear; John G. Greis

    2013-01-01

    Please visit the Southern Forest Futures Project website for more information.The Southern Forest Futures Project provides a science-based “futuring” analysis of the forests of the 13 States of the Southeastern United States. With findings...

  14. The ICE-CREAM Project : final report

    NARCIS (Netherlands)

    Janse, M.D.

    2004-01-01

    The ICE-CREAM project has been investigating how to make compelling experiences for end-users based on enabling technologies for interactive media, such as DVB-MHP, Internet and MPEG-4. The goals of the project were to extend the notion of interaction, to exploit domestic activities and familiar

  15. Kalispel Resident Fish Project : Annual Report, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  16. Collaborative Elder Abuse Prevention Project Quarterly Report.

    Science.gov (United States)

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide collaborative elder abuse prevention project, to prevent abuse of elderly and disabled adults. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for…

  17. Project International Emphasis Interim Report, July 1991.

    Science.gov (United States)

    Blois, Beverly, Ed.; Williams, Barbara

    Project International Emphasis (PIE), a curriculum development effort involving all 24 colleges in the Virginia Community College System (VCCS), focuses on the infusion of globally oriented components across the academic curriculum and in related career development programs. Activities undertaken during the project's first year included an annual…

  18. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  19. Hispanic Vocational Exploration Project. Final Report.

    Science.gov (United States)

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  20. A Systematic Review of Cost-Effectiveness Studies Reporting Cost-per-DALY Averted.

    Directory of Open Access Journals (Sweden)

    Peter J Neumann

    Full Text Available Calculating the cost per disability-adjusted life years (DALYs averted associated with interventions is an increasing popular means of assessing the cost-effectiveness of strategies to improve population health. However, there has been no systematic attempt to characterize the literature and its evolution.We conducted a systematic review of cost-effectiveness studies reporting cost-per-DALY averted from 2000 through 2015. We developed the Global Health Cost-Effectiveness Analysis (GHCEA Registry, a repository of English-language cost-per-DALY averted studies indexed in PubMed. To identify candidate studies, we searched PubMed for articles with titles or abstracts containing the phrases "disability-adjusted" or "DALY". Two reviewers with training in health economics independently reviewed each article selected in our abstract review, gathering information using a standardized data collection form. We summarized descriptive characteristics on study methodology: e.g., intervention type, country of study, study funder, study perspective, along with methodological and reporting practices over two time periods: 2000-2009 and 2010-2015. We analyzed the types of costs included in analyses, the study quality on a scale from 1 (low to 7 (high, and examined the correlation between diseases researched and the burden of disease in different world regions.We identified 479 cost-per-DALY averted studies published from 2000 through 2015. Studies from Sub-Saharan Africa comprised the largest portion of published studies. The disease areas most commonly studied were communicable, maternal, neonatal, and nutritional disorders (67%, followed by non-communicable diseases (28%. A high proportion of studies evaluated primary prevention strategies (59%. Pharmaceutical interventions were commonly assessed (32% followed by immunizations (28%. Adherence to good practices for conducting and reporting cost-effectiveness analysis varied considerably. Studies mainly included

  1. Projected Costs of Informal Caregiving for Cardiovascular Disease: 2015 to 2035: A Policy Statement From the American Heart Association.

    Science.gov (United States)

    Dunbar, Sandra B; Khavjou, Olga A; Bakas, Tamilyn; Hunt, Gail; Kirch, Rebecca A; Leib, Alyssa R; Morrison, R Sean; Poehler, Diana C; Roger, Veronique L; Whitsel, Laurie P

    2018-05-08

    In a recent report, the American Heart Association estimated that medical costs and productivity losses of cardiovascular disease (CVD) are expected to grow from $555 billion in 2015 to $1.1 trillion in 2035. Although the burden is significant, the estimate does not include the costs of family, informal, or unpaid caregiving provided to patients with CVD. In this analysis, we estimated projections of costs of informal caregiving attributable to CVD for 2015 to 2035. We used data from the 2014 Health and Retirement Survey to estimate hours of informal caregiving for individuals with CVD by age/sex/race using a zero-inflated binomial model and controlling for sociodemographic factors and health conditions. Costs of informal caregiving were estimated separately for hypertension, coronary heart disease, heart failure, stroke, and other heart disease. We analyzed data from a nationally representative sample of 16 731 noninstitutionalized adults ≥54 years of age. The value of caregiving hours was monetized by the use of home health aide workers' wages. The per-person costs were multiplied by census population counts to estimate nation-level costs and to be consistent with other American Heart Association analyses of burden of CVD, and the costs were projected from 2015 through 2035, assuming that within each age/sex/racial group, CVD prevalence and caregiving hours remain constant. The costs of informal caregiving for patients with CVD were estimated to be $61 billion in 2015 and are projected to increase to $128 billion in 2035. Costs of informal caregiving of patients with stroke constitute more than half of the total costs of CVD informal caregiving ($31 billion in 2015 and $66 billion in 2035). By age, costs are the highest among those 65 to 79 years of age in 2015 but are expected to be surpassed by costs among those ≥80 years of age by 2035. Costs of informal caregiving for patients with CVD represent an additional 11% of medical and productivity costs

  2. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  3. The Current and Projected Taxpayer Shares of US Health Costs.

    Science.gov (United States)

    Himmelstein, David U; Woolhandler, Steffie

    2016-03-01

    We estimated taxpayers' current and projected share of US health expenditures, including government payments for public employees' health benefits as well as tax subsidies to private health spending. We tabulated official Centers for Medicare and Medicaid Services figures on direct government spending for health programs and public employees' health benefits for 2013, and projected figures through 2024. We calculated the value of tax subsidies for private spending from official federal budget documents and figures for state and local tax collections. Tax-funded health expenditures totaled $1.877 trillion in 2013 and are projected to increase to $3.642 trillion in 2024. Government's share of overall health spending was 64.3% of national health expenditures in 2013 and will rise to 67.1% in 2024. Government health expenditures in the United States account for a larger share of gross domestic product (11.2% in 2013) than do total health expenditures in any other nation. Contrary to public perceptions and official Centers for Medicare and Medicaid Services estimates, government funds most health care in the United States. Appreciation of government's predominant role in health funding might encourage more appropriate and equitable targeting of health expenditures.

  4. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

  5. Project Sterling. Project manager's report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1967-12-01

    The Sterling experiment, detonated Dec. 3, 1966, was the first decoupled underground nuclear detonation. This experiment used the existing Salmon cavity and the original Salmon emplacement hole. The principal purpose of the Sterling experiment was (1) to determine the extent of decoupling of a sprung cavity in salt; specifically, to determine the decoupling ratio as a function of frequency; (2) to determine the accuracy of decoupling calculations for a sprung cavity; and (3) to define any operational problems associated with the reuse of a cavity. Project Sterling is a part of the Vela Uniform program. Vela is the short title of a research and development program directed toward locating, detecting, and identifying underground, surface, and high altitude nuclear detonations. The administration, operational planning, public safety, engineering and construction and logistics performed by NVOO in support of the technical and scientific experiments carried out are presented. (TFD)

  6. Solar Avoided Cost Solution SunShot 6 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, John [Genability, San Francisco, CA (United States); Danziger, Eric [Genability, San Francisco, CA (United States)

    2014-01-29

    The core objectives of this project were two separate but integrated products, collectively providing game-changing Avoided Cost capabilities. The first was a kit of avoided cost tools and data that any solar provider can use a-lacarte or as a whole. It’s open and easily accessible nature allows the rapid and accurate calculation of avoided cost in whatever context and software that make sense (“Typical and Avoided Cost Tools”). This kit includes a dataset of typical energy rates, costs and usage that can be used for solar prospecting, lead generation and any situation where data about an opportunity is missing or imperfect. The second is a web application and related APIs specifically built for solar providers to radically streamline their lead-to-sale process (“Solar Provider Module”). The typical and Avoided Cost tools are built directly into this, and allow for solar providers to track their opportunities, collaborate with their installers and financiers, and close more sales faster.

  7. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  8. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  9. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  10. Status Report of Projects Activities at CERN

    CERN Document Server

    Missiaen, Dominique; Dobers, Tobias; Fuchs, Jean-Frederic; Gayde, Jean-Christophe; Jones, Mark; Mainaud Durand, Helene

    2014-01-01

    Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view.

  11. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  12. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Science.gov (United States)

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  13. The ALPHA project: A progress report

    International Nuclear Information System (INIS)

    Yadigaroglu, G.

    1995-01-01

    A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of passive Advanced Light Water Reactors. In its present phase, the project is directed to the investigation of the Simplified Boiling Water Reactor (SBWR) Passive Containment Cooling system. The project includes separate-effects tests of containment phenomena (the LINX program). The effects of aerosols that may result from hypothetical severe accidents are also considered (the AIDA program). The construction and commissioning of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA is complete and the first series of tests are underway. Scaling studies have guided their design. Several small-scale experiments and studies have already produced valuable results

  14. Medicare Demonstration Projects and Evaluation Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) conducts and sponsors a number of innovative demonstration projects to test and measure the effect of potential...

  15. Status report EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.; Kopecky, J.

    1990-08-01

    The European Fusion File (EFF) project and the associated European Activation File Project (EAF) are sponsored by the European Community's Fusion Technology Programme. The 1st programme is directed to the short-term needs of the NET team, which designs the Next European Torus, while the 2nd program is directed to long-term needs in the development of a Fusion Demonstration Reactor, in particular in connection with the study of low-activation materials. Various European laboratories participate in this project. The programme of the EFF-project is in its 2nd phase, after the successful completion of the EFF-1 data file. The emphasis on the 1st phase was on the improvement of the tritium breeding and neutron multiplication cross sections, while the 2nd phase emphasizes the improvement of a shielding data base. The progress of this 2nd phase is described. (author). 1 tab

  16. Final Report on Atomic Database Project

    International Nuclear Information System (INIS)

    Yuan, J.; Gui, Z.; Moses, G.A.

    2006-01-01

    LTE model, the calculation is simple since the Boltzmann distribution can be used. As long as we have the energy levels and the ionization energy, we can calculate the plasma population very easily. However, for the non-LTE model, the calculation is very complex since various atomic data are required to build the transition balance matrix. Currently, empirical formulas are used to calculate these data such as electron collision ionization and autoionization. Furnished with these tested atomic data computing codes, we have developed a friendly user interface and a flexible atomic database [5]. The UTA model is considered the most practical method for medium and high Z elements since it is very time-consuming and difficult to calculate the enormous number of the transitions. However, the UTA model may overestimate the opacity, therefore, the DTA model is desirable even for medium and high Z elements. With the constant decrease in the cost of the disk storage and increase of CPU speed, it is possible to apply the DTA model to the medium and high Z elements. In this project, we calculate opacities for high Z elements in fully detailed term accounting model for significant populated states. For the various rate coefficients, we calculate the data using the detailed configuration accounting approximation. In order to handle the large volume of data generated for medium to high-Z atoms, we use the HDF data format as our database format, which is becoming a standard for storing scientific data. We have built a sophisticated graphical user interface using Java technology to distinguish our atomic database from other existing databases. Unlike other atomic databases, in which the users can obtain the opacity data in a pair of photon energy and opacity, in our database the user can browser more detailed atomic data information other than the opacity data set by combining our atomic database and Java technology. For example, the user can find out the abundant ion stage and

  17. The Southern Forest Futures Project: summary report

    Science.gov (United States)

    David N. Wear; John G. Greis

    2012-01-01

    The Southern Forest Futures Project provides a science-based “futuring” analysis of the forests of the 13 States of the Southeastern United States. With findings organized in a set of scenarios and using a combination of computer models and science synthesis, the authors of the Southern Forest Futures Project examine a variety of possible futures that could shape...

  18. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  19. The STRIPA project. Annual report 1986

    International Nuclear Information System (INIS)

    1987-08-01

    A summary of the Stripa Project phase 2 is given. The detailed informations describe crosshole techniques for the detection and characterization of fracture zones, the hydrological characterization of the Stripa site Part II, a three-dimensional migration experiment, borehole, shaft and tunnel sealing, the hydrogeochemical characterization of the Stripa groundwater and question of economy. A decision was taken in principale for an extension of the project into a third phase. (DG)

  20. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  1. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  2. Canadian Fusion Fuels Technology Project activities report

    International Nuclear Information System (INIS)

    1985-01-01

    The Canadian Fusion Fuels Technology Project was formally established in 1982. The project is directed toward the further development of Canadian capabilities in five major areas: tritium technology, breeder technology, materials technology, equipment development and safety and the environment. The project is funded by three partners - Government of Canada (50%), Ontario Provincial Government (25%) and Ontario Hydro (25%). The fiscal year 1984/85 represents the third year of operation of the project. In 1984/85, 108 contracts were awarded totalling $4 million. Supplementary funding by subcontractors added approximately $1.9 million to the total project value. More than 200 people participated in the technical work involved in the project. Sixteen people were on attachment to foreign facilities for terms ranging from 1 month to 2.5 years. Five patents were applied for including a tritium discrimination monitor, a new radio-chemical tritium separation method, a new variation of fuel cleanup by gas chromatography, a passive tritium permeation system using bimetallic membranes, and a new breeder process using lithium salts dissolved in heavy water

  3. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    Energy Technology Data Exchange (ETDEWEB)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  4. Final Technical Report. Project Boeing SGS

    Energy Technology Data Exchange (ETDEWEB)

    Bell, Thomas E. [The Boeing Company, Seattle, WA (United States)

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  5. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  6. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  7. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  8. The Project Of Another Low-Cost Metaphase Finder

    International Nuclear Information System (INIS)

    Furukawa, Akira

    2016-01-01

    The most popular and 'gold standard' phenomenon in Biological dosimetry is the appearance of dicentric chromosomes in metaphase in white blood cells. The metaphase finder is a tool for biological dosimetry that finds metaphase cells on slide glasses. The author and a software company were using new special software that was faster than conventional systems. A Nikon Eclipse Ni-E microscope with motorised X-Y stage, 4x objective lens and 1920 x 1024 pixels colour camera for hardware were used. The software uses mathematical morphology filters. The new system was compact and low-priced. And the remarkable point is, this system can be applicable not only to human blood, but also to non-human samples. The speed was 208-236 s per 5 x 20 mm area, while capturing 378 images, which achieved the aim of the project. The false-positive ratio achieved below 5% in some slides. (author)

  9. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  10. Project Report on Development of a Safeguards Approach for Pyroprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Robert Bean

    2010-09-01

    The Idaho National Laboratory has undertaken an effort to develop a standard safeguards approach for international commercial pyroprocessing facilities. This report details progress for the fiscal year 2010 effort. A component by component diversion pathway analysis has been performed, and has led to insight on the mitigation needs and equipment development needed for a valid safeguards approach. The effort to develop an in-hot cell detection capability led to the digital cloud chamber, and more importantly, the significant potential scientific breakthrough of the inverse spectroscopy algorithm, including the ability to identify energy and spatial location of gamma ray emitting sources with a single, non-complex, stationary radiation detector system. Curium measurements were performed on historical and current samples at the FCF to attempt to determine the utility of using gross neutron counting for accountancy measurements. A solid cost estimate of equipment installation at FCF has been developed to guide proposals and cost allocations to use FCF as a test bed for safeguards measurement demonstrations. A combined MATLAB and MCNPX model has been developed to perform detector placement calculations around the electrorefiner. Early harvesting has occurred wherein the project team has been requested to provide pyroprocessing technology and safeguards short courses.

  11. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  12. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    NARCIS (Netherlands)

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by

  13. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  14. Bottom-up comparisons of CO2 storage and costs in forestry and biomass energy projects

    International Nuclear Information System (INIS)

    Swisher, J.N.

    1993-01-01

    In order to include forestry and biomass energy projects in a possible CO 2 emission reduction regime, and to compare the costs of individual projects or national programs, it is necessary to determine the rate of equivalency between carbon in fossil fuel emissions and carbon stored in different types of forestry, biomass and renewable energy projects. This paper presents a comprehensive and consistent methodology to account for the costs and carbon flows of different categories of forestry and biomass energy projects and describes the application of the methodology to several sets of projects in Latin America. The results suggest that both biomass energy development and forestry measures including reforestation and forest protection can contribute significantly to the reduction of global CO 2 emissions, and that local land-use capacity must determine the type of project that is appropriate in specific cases. No single approach alone is sufficient as either a national or global strategy for sustainable land use or carbon emission reduction

  15. Moly99 Production Facility: Report on Beamline Components, Requirements, Costs

    Energy Technology Data Exchange (ETDEWEB)

    Bishofberger, Kip A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-12-23

    In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introduced briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.

  16. EUDP Project: Low Noise Airfoil - Final Report

    DEFF Research Database (Denmark)

    This document summarizes the scientific results achieved during the EUDP-funded project `Low-Noise Airfoil'. The goals of this project are, on one side to develop a measurement technique that permits the evaluation of trailing edge noise in a classical aerodynamic wind tunnel, and on the other side...... to develop and implement a design procedure to manufacture airfoil profiles with low noise emission. The project involved two experimental campaigns: one in the LM Wind Power wind tunnel, a classical aerodynamic wind tunnel, in Lunderskov (DK), the second one in the Virginia Tech Stability Wind Tunnel....... In particular, the so-called TNO trailing edge noise model could be significantly improved by introducing turbulence anisotropy in its formulation, as well as the influence of the boundary layer mean pressure gradient. This two characteristics are inherent to airfoil flows but were neglected in the original...

  17. Budget Period 2 Summary Report Part 3: Hywind Maine Project

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Frederick [Statoil Wind US LLC, Washington, DC (United States); Platt, Andrew [Statoil Wind US LLC, Washington, DC (United States); Sirnivas, Senu [Statoil Wind US LLC, Washington, DC (United States)

    2015-08-15

    This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data

  18. Advanced Neutron Source (ANS) Project progress report, FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, J.H.; King-Jones, K.H. [eds.; Selby, D.L.; Harrington, R.M. [Oak Ridge National Lab., TN (United States); Thompson, P.B. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States). Central Engineering Services

    1995-01-01

    The President`s budget request for FY 1994 included a construction project for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the minimum design requirement set by the user community. At the time of this writing, DOE has not established an enrichment level for ANS, but two advisory committees have recommended adopting the new core design, provided the minimum flux requirements are still met.

  19. Advanced Neutron Source (ANS) Project progress report, FY 1994

    International Nuclear Information System (INIS)

    Campbell, J.H.; King-Jones, K.H.; Thompson, P.B.

    1995-01-01

    The President's budget request for FY 1994 included a construction project for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the minimum design requirement set by the user community. At the time of this writing, DOE has not established an enrichment level for ANS, but two advisory committees have recommended adopting the new core design, provided the minimum flux requirements are still met

  20. Community-Level Impacts Projection System (CLIPS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Monts, J.K.; Bareiss, E.R.

    1979-02-01

    The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands and spatial location; to estimate how many in-migrating workers will be required; to estimate the demographic characteristics of the in-migrating workers (e.g., how many elementary school children they will bring); to estimate how many additional secondary employment opportunities (e.g., employment in eating and drinking establishments and grocery stores) will be generated; to estimate what the local area's population levels in various age groups would be both with the project and without it; to estimate community population levels for both the impact case and the baseline case; and to estimate the approximate resource requirements and costs for providing additional municipal facilities and services (e.g., water treatment and distribution, wastewater treatment and collection, gas and electric distribution, police and fire protection, etc.)

  1. Kalispel Resident Fish Project : Annual Report, 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Todd [Kalispel Natural Resource Department

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  2. The Soleil detailed pre-project report

    International Nuclear Information System (INIS)

    1999-01-01

    The aim of the joint CNRS/CEA Soleil project was to develop a facility equipped with several synchrotron radiation sources and their associated experimental devices in order to answer the estimated research needs in this domain for the 20 to 30 forthcoming years. This document is the detailed pre-project. It describes the studies carried out and relative to the infrastructures and buildings, to the accelerators and light sources (storage ring, injector, radiation production), to the program of experiments, to the computer science aspects, and to the administrative and organisational aspects. (J.S.)

  3. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Clark, F.R.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project

  4. Nuclear data project evaluation activity report. October 1998 - October 2000

    International Nuclear Information System (INIS)

    Akovali, Y.; Blackmon, J.; Radford, D.; Smith, M.

    2001-01-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report

  5. Nuclear data project evaluation activity report. October 1998 - October 2000

    Energy Technology Data Exchange (ETDEWEB)

    Akovali, Y; Blackmon, J; Radford, D; Smith, M [Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN (United States)

    2001-02-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report.

  6. Report on the Audit of Foreign Direct Selling Costs

    National Research Council Canada - National Science Library

    1990-01-01

    This is our final report on the Audit of Foreign Direct Selling Costs. The Contract Management Directorate made the audit from October 1989 to January 1990 in response to a requirement in U.S.C., title 10, Sec. 2324(f)(5...

  7. Report on the Audit of Foreign Direct Selling Costs

    Science.gov (United States)

    1990-09-18

    This is our final report on the Audit of Foreign Direct Selling Costs. The Contract Management Directorate made the audit from October 1989 to...The objective of the audit was to assess whether DoD regulations provided the appropriate incentives to stimulate exports by the. U.S. Defense

  8. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  9. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  10. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  11. Technology Cost and Schedule Estimation (TCASE) Final Report

    Science.gov (United States)

    Wallace, Jon; Schaffer, Mark

    2015-01-01

    During the 2014-2015 project year, the focus of the TCASE project has shifted from collection of historical data from many sources to securing a data pipeline between TCASE and NASA's widely used TechPort system. TCASE v1.0 implements a data import solution that was achievable within the project scope, while still providing the basis for a long-term ability to keep TCASE in sync with TechPort. Conclusion: TCASE data quantity is adequate and the established data pipeline will enable future growth. Data quality is now highly dependent the quality of data in TechPort. Recommendation: Technology development organizations within NASA should continue to work closely with project/program data tracking and archiving efforts (e.g. TechPort) to ensure that the right data is being captured at the appropriate quality level. TCASE would greatly benefit, for example, if project cost/budget information was included in TechPort in the future.

  12. Project Ta-kos Outreach. Final Report.

    Science.gov (United States)

    Askew, Linda; And Others

    The Project Ta-kos Outreach program is an inservice training model designed to increase the probability that children (ages birth to 8) at risk for or with special needs and their families can access and receive appropriate services in order to remain an integral part of the community in which they reside. The program reflects an ecological…

  13. Maine Project against Bullying. Final Report.

    Science.gov (United States)

    Saufler, Chuck; Gagne, Cyndi

    Noting that bullying among primary school-age children has become recognized as an antecedent to more violent behavior in later grades, the 3-year Maine Project Against Bullying examined currently available research on bullying and evaluated books, curricula, media materials, and programs to identify resources and strategies which can be applied…

  14. Horse Palace photovoltaic pilot project findings report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-06-15

    This paper provided details of a solar photovoltaic (PV) feasibility study conducted as part of the Toronto Exhibition Place's 2010 energy self-sufficiency plan. The 100 kw plant was installed on the roof of the Horse Palace, and when first installed represented the largest urban PV array in Canada. The study was conducted to compare the performance of technology alternatives under otherwise common environmental and operating conditions, to build capacity to operate large roof-mounted PV systems in Toronto, and to gain experience with Ontario's renewable energy standard offer program (RESOP). The initial year of monitoring identified complications with inverters and monitoring equipment, shading issues, and problems with data collection and management. Interconnecting the project with the electricity grid to sell the produced power was a complicated and lengthy procedure. A problem with the baseline performance modeling that was used to assess the project was also identified. In 2008, the project produced 96,724 kWh. Simple payback for the project was estimated at 16.7 years. The plant is now participating in the RESOP and receiving monthly payments. 14 figs., 2 appendices.

  15. Ecological Compliance Assessment Project: 1994 Summary report

    International Nuclear Information System (INIS)

    Brandt, C.A.

    1994-11-01

    The Ecological Compliance Assessment Project (ECAP) began full operation on March 1, 1994. The project is designed around a baseline environmental data concept that includes intensive biological field surveys of key areas of the Hanford Site where the majority of Site activities occur. These surveys are conducted at biologically appropriate times of year to ensure that the data gathered are current and accurate. The data are entered into the ECAP database, which serves as a reference for the evaluation of review requests coming in to the project. This methodology provided the basis for over 90 percent of the review requests received. Field surveys conducted under ECAP are performed to document occurrence information for species of concern and to obtain habitat descriptions. There are over 200 species of concern on the Hanford Site, including plants, birds, mammals, reptiles, amphibians, fish, and invertebrates. In addition, Washington State has designated mature sagebrush-steppe habitat as a Priority Habitat meriting special protective measures. Of the projects reviewed, 17 resulted or will result in impacts to species or habitats of concern on the Hanford Site. The greatest impact has been on big sagebrush habitat. Most of the impact has been or will be within the 600 Area of the Site

  16. The Continuity Project, Fall 1997 Report.

    Science.gov (United States)

    Wasilko, Peter J.

    The Continuity Project is a research, development, and technology transfer initiative aimed at creating a "Library of the Future" by combining features of an online public access catalog (OPAC) and a campus wide information system (CWIS) with advanced facilities drawn from such areas as artificial intelligence (AI), knowledge…

  17. Project SEED. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2012

    2012-01-01

    "Project SEED" is a supplemental mathematics program for low-achieving students in grades 3 through 8 and is intended to prepare students to be successful in high school and college math. Based on the Socratic method, instruction is delivered through a series of questions to the class. In addition to individual responses, the instructor…

  18. Externalities of fuel cycles 'ExternE' project. Summary report

    International Nuclear Information System (INIS)

    Holland, M.; Berry, J.

    1994-01-01

    energy use in the transport and domestic sectors and a number of non-environmental externalities. Phase 3 of the project will be undertaken within the European Commission's 4th Framework Programme (1995-1998) and will concentrate on the application of the accounting framework in support of policy issues and decision making. A major result of this work is the methodology which has been developed. This is a significant advance on earlier studies of the external costs of energy. It provides a transparent basis on which different impacts, technologies and locations may be compared. It is suitable for evaluation of the health and environmental damages due to increments in electricity production, with or without monetary valuation of the impacts. This report reviews this methodology and presents the major results obtained in its application to seven important fuel cycles, namely the coal, lignite, oil, gas, nuclear, hydro and wind fuel cycles. Chapter 2 reviews the methodology developed for the quantification of impacts and discusses the associated issues. Chapter 3 discusses the methodological issues associated with the economic valuation of impacts. Chapters 4 and 5 report in detail on the assessment of the coal and nuclear fuel cycles. Chapter 6 summarises the progress that has been made to date on the ExternE Project and presents a comparison of the results obtained for the four fossil fuel cycles together with results from the nuclear and renewable fuel cycles. This project is at the forefront of work in this area. It has drawn together an extensive multidisciplinary team of environmental scientists, energy technologists, health and ecology experts, atmospheric modellers, economists and computer analysts. The results obtained are based on thorough review of scientific and economic studies. This does not mean that exact values have been established for external costs. Indeed, one of our most important conclusions is that the uncertainties are large. Previous analyses

  19. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  20. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  1. Photovoltaic Programme Edition 2007. Summary Report, Project List, Annual Project Reports 2006 (Abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This 2007 edition summary report for the Swiss Federal Office of Energy (SFOE), reports on the work done within the framework of the Swiss Photovoltaics Program in 2006. The document contains 46 abstracts on work done in the photovoltaics area. The subjects reported on in the thin-film photovoltaics sector include advanced processing and characterisation of thin film silicon solar cells, high-rate deposition of micro-crystalline silicon, a new large-area VHF reactor for high-rate deposition of micro-crystalline silicon, the stability of zinc oxide in encapsulated thin film silicon solar cells, spectral photocurrent measurement, roll-to-roll technology for the production of thin film silicon modules, advanced thin film technologies, ultra thin silicon wafer cutting, bifacial thin industrial multi-crystalline silicon solar cells, flexible CIGS solar cells and mini-modules, large-area CIS-based thin-film solar modules and advanced thin-film technologies. In the area of dye-sensitised modules, the following projects are reported on: Dye-sensitised nano-crystalline solar cells, voltage enhancement of dye solar cells and molecular orientation as well as low band-gap and new hybrid device concepts for the improvement of flexible organic solar cells. Other projects reported on include a new PV wave making more efficient use of the solar spectrum, photovoltaic textiles, organic photovoltaic devices, photo-electrochemical and photovoltaic conversion and storage of solar energy, PV modules with antireflex glass, improved integration of PV into existing buildings, the seventh program at the LEEE-TISO, the 'PV enlargement' and 'Performance' programs, efficiency and annual electricity production of PV modules, photovoltaics system technology 2005-2006, an update on photovoltaics in view of the 'ecoinvent' v.2.0 tool and environmental information services for solar energy industries. The contributions to four Swiss IEA PVPS tasks and the Swiss

  2. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  3. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  4. GAO report and EDF cost revisions reignite debate on Hinkley Point C

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, The Independent Global Nuclear News Agency, Brussels (Belgium)

    2017-10-15

    The announcement by French state-controlled utility EDF that it has added pound 1.5 bn (Euro 1.7 bn, $ 1.9 bn) to its estimated costs for two new reactors at Hinkley Point C, has led to questions about whether the government should rethink the project, with some politicians calling for it to be abandoned. EDF's announcement came less than two weeks after a report from the Government Accountability Office (GAO) said the government's deal for the two EPR units, now estimated to be costing pound 19.6 bn (Euro 22.3 bn, $ 25.5 bn), has locked consumers into a risky and expensive project with uncertain strategic and economic benefits. The UK's Energy Technologies Institute (ETI), in a report prepared before the EDF announcement, had already said the requirement to improve the predictability and affordability of new nuclear power plants has never been stronger.

  5. GAO report and EDF cost revisions reignite debate on Hinkley Point C

    International Nuclear Information System (INIS)

    Dalton, David

    2017-01-01

    The announcement by French state-controlled utility EDF that it has added pound 1.5 bn (Euro 1.7 bn, $ 1.9 bn) to its estimated costs for two new reactors at Hinkley Point C, has led to questions about whether the government should rethink the project, with some politicians calling for it to be abandoned. EDF's announcement came less than two weeks after a report from the Government Accountability Office (GAO) said the government's deal for the two EPR units, now estimated to be costing pound 19.6 bn (Euro 22.3 bn, $ 25.5 bn), has locked consumers into a risky and expensive project with uncertain strategic and economic benefits. The UK's Energy Technologies Institute (ETI), in a report prepared before the EDF announcement, had already said the requirement to improve the predictability and affordability of new nuclear power plants has never been stronger.

  6. Annual Report, Fall 2016: Identifying Cost Effective Tank Waste Characterization Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Reboul, S. H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); DiPrete, D. P. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-12-12

    This report documents the activities that were performed during the second year of a project undertaken to improve the cost effectiveness and timeliness of SRNL’s tank closure characterization practices. The activities performed during the first year of the project were previously reported in SRNL-STI-2015-00144. The scope of the second year activities was divided into the following three primary tasks: 1) develop a technical basis and strategy for improving the cost effectiveness and schedule of SRNL’s tank closure characterization program; 2) initiate the design and assembly of a new waste removal system for improving the throughput and reducing the personnel dose associated with extraction chromatography radiochemical separations; and 3) develop and perform feasibility testing of three alternative radiochemical separation protocols holding promise for improving high resource demand/time consuming tank closure sample analysis methods.

  7. A low-cost and portable realization on fringe projection three-dimensional measurement

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  8. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  9. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  10. Project Aprendizaje, 1988-89. Evaluation Section Report. OREA Report.

    Science.gov (United States)

    Berney, Tomi D.; Velasquez, Clara

    In it's first year, Project Aprendizaje served 250 students from the Dominican Republic and Puerto Rico at Seward Park High School in Manhattan (New York). Project objectives were to improve participants' language skills in Spanish and English, help participants successfully complete content area courses needed for graduation, and provide career…

  11. Canadian Fusion Fuels Technology Project annual report 93/94

    International Nuclear Information System (INIS)

    1994-01-01

    The Canadian Fusion Fuels Technology Project exists to develop fusion technologies and apply them worldwide in today's advanced fusion projects and to apply these technologies in fusion and tritium research facilities. CFFTP concentrates on developing capability in fusion fuel cycle systems, in tritium handling technologies and in remote handling. This is an annual report for CFFTP and as such also includes a financial report

  12. Massachusetts Crystalline Repository Project. Progress report, December 31, 1985

    International Nuclear Information System (INIS)

    1985-01-01

    Project activities which have been undertaken include the following: review and comment on OCRD projects reports; review of pertinent DOE, NRC, EPA, and DOT quidelines and regulations; review of reports and maps released by the federal project group and contractors; attendance at DOE workshops and conferences; implementation of state-specific research activities; interaction with representatives of federal agencies and other participating states; and interface with media, state officials and legislators, and interested citizens

  13. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  14. Final performance report for Project JEM

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  15. The Versatile Link common project: feasibility report

    International Nuclear Information System (INIS)

    Vasey, F; Soos, C; Troska, J; Hall, D; Huffman, T; Weidberg, T; Kwan, S; Prosser, A; Xiang, A; Ye, J

    2012-01-01

    The Versatile Link is a bi-directional digital optical data link operating at rates up to 4.8 Gbit/s and featuring radiation-resistant low-power and low-mass front-end components. The system is being developed in multimode or singlemode versions operating at 850 nm or 1310 nm wavelength respectively. It has serial data interfaces and is protocol-agnostic, but is targeted to operate in tandem with the GigaBit Transceiver (GBT) serializer/deserializer chip being designed at CERN. This paper gives an overview of the project status three and a half years after its launch. It describes the challenges encountered and highlights the solutions proposed at the system as well as the component level. It concludes with a positive feasibility assesment and an outlook for future project development directions.

  16. EuCARD final project report

    CERN Document Server

    Koutchouk, J P

    2014-01-01

    After four years of activity, EuCARD has most of its objectives fulfilled, with some new objectives added and a few others on excellent tracks while requiring additional time. The management has been active in reinforcing the collaborative links between partners and projects, contributing to the preparation of FP7-EuCARD2, initiating FP7-HiLumi-LHC Design Study, to favour sustained collaborations beyond EuCARD. An out-of-contract network has been successfully launched on laser plasma acceleration, to combine forces between accelerator, laser and plasma communities. Communication and dissemination activities have led to two highlights: Accelerating News, an accelerator R&D newsletter initiated by EuCARD and now common to all FP7 accelerator projects (over 1000 subscribers) and a series of monographs on accelerator sciences that is progressively finding its public. The scientific networks have more than fulfilled their initial objectives: roadmaps are defined for neutrino facilities, submitted to the Europe...

  17. The ETE spherical Tokamak project. IAEA report

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, Gerson Otto; Del Bosco, E.; Berni, L.A.; Ferreira, J.G.; Oliveira, R.M.; Andrade, M.C.R.; Shibata, C.S.; Barroso, J.J.; Castro, P.J.; Patire Junior, H. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil). Lab. Associado de Plasma]. E-mail: ludwig@plasma.inpe.br

    2002-07-01

    This paper describes the general characteristics of spherical tokamaks, or spherical tori, with a brief overview of work in this area already performed or in progress at several institutions worldwide. The paper presents also the historical development of the ETE (Spherical Tokamak Experiment) project, its research program, technical characteristics and operating conditions as of October, 2002 at the Associated Plasma Laboratory (LAP) of the National Space Research Institute (INPE) in Brazil. (author)

  18. The CHEMVAL 2 project - status report

    International Nuclear Information System (INIS)

    Read, D.

    1993-01-01

    This paper summarizes the progress made during the first year of CHEMVAL 2, a coordinated four year research programme for evaluating and enhancing chemical models used in radiological risk assessment. Eighteen organisations from nine countries are currently participating, several of whom are also undertaking related experimental studies within the Commission of European Communities (CEC) MIRAGE Project (Migration of Radionuclides in the geosphere) - Third Phase. 16 refs., 3 figs

  19. Annual report on reactor safety research projects. Reporting period 2013. Progress report

    International Nuclear Information System (INIS)

    2013-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  20. Annual report on reactor safety research projects. Reporting period 2011. Progress report

    International Nuclear Information System (INIS)

    2011-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  1. Annual report on reactor safety research projects. Reporting period 2014. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. lt has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  2. Annual report on reactor safety research projects. Reporting period 2015. Progress report

    International Nuclear Information System (INIS)

    2015-01-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft tor Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are ·' prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. it has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  3. Half Moon Cove Tidal Project. Feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    The proposed Half Moon Cove Tidal Power Project would be located in a small cove in the northern part of Cobscook Bay in the vicinity of Eastport, Maine. The project would be the first tidal electric power generating plant in the United States of America. The basin impounded by the barrier when full will approximate 1.2 square miles. The average tidal range at Eastport is 18.2 feet. The maximum spring tidal range will be 26.2 feet and the neap tidal range 12.8 feet. The project will be of the single pool-type single effect in which generation takes place on the ebb tide only. Utilizing an average mean tidal range of 18.2 feet the mode of operation enables generation for approximately ten and one-half (10-1/2) hours per day or slightly in excess of five (5) hours per tide. The installed capacity will be 12 MW utilizing 2 to 6 MW units. An axial flow, or Bulb type of turbine was selected for this study.

  4. NSDD LBNL Isotopes Project Collaboration Report

    Energy Technology Data Exchange (ETDEWEB)

    Firestone, R. B. [Isotopes Project, Lawrence Berkeley National Laboratory, Berkeley CA (United States)

    2013-08-15

    The Isotopes Project group currently consists of five scientists and a postdoctoral student. It also leads the Evaluated Gamma-ray Activation File (EGAF) collaboration consisting of over 20 scientists at ten universities and laboratories. The group is responsible for the evaluation of mass chains in the region 21-30. EGAF evaluations: The Isotope Project's primary effort is to measure and evaluate neutron capture {gamma}-ray cross section data for all stable and selected radioactive isotopes. These data include prompt and delayed {gamma}-ray cross sections, {delta}{sub {gamma}}, total thermal radiative neutron cross sections, {delta}{sub 0}, and neutron separation energies, S{sub n}. The first EGAF elemental {gamma}-ray cross section library was published as the result of an IAEA CRP and the neutron separation energies were supplied to the Atomic Mass Evaluation project for inclusion in their most recent evaluation. EGAF is being updated with new experiments on enriched isotopes using the Budapest and Munich FRM II guided neutron beam facilities. New measurements have been performed on the isotopes {sup 151,153}Eu, {sup 155,157}Gd, {sup 180,182,183,184,186}W, {sup 237}Np, {sup 240}Pu, and {sup 241}Am. Additional measurements have been approved for 2013 on {sup 70,72,73,74,76}Ge, {sup 90,91,92,94,96}Zr, and {sup 238}U.

  5. The Dust Management Project: Final Report

    Science.gov (United States)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  6. The cost of solar refrigeration: The rococo project; Was solare Kuehlung kostet - das Rococo-Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, J.P.

    2008-01-21

    The cost of modern solar refrigerators is between 1,300 and 8,000 Euros per kW of refrigeration capacity. The biggest potential for savings is in the peripheral components, as well as in the operating cost and especially in servicing. Cost reduction must have priority if solar refrigeration is to be successful in the market. In the context of the European research project ''Reduction of costs of Solar Cooling systems'' (Rococo), a team of scientists from France, Spain and Austria investigated existing systems. (orig.)

  7. Estimating Total Program Cost of a Long-Term, High-Technology, High-Risk Project with Task Durations and Costs That May Increase Over Time

    National Research Council Canada - National Science Library

    Brown, Gerald G; Grose, Roger T; Koyak, Robert A

    2006-01-01

    .... Each task suffers some risk of delay and changed cost. Ignoring budget constraints, we use Monte Carlo simulation of the duration of each task in the project to infer the probability distribution of the project completion time...

  8. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  9. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  10. Cost and sensitivity analysis for uranium in situ leach mining. Open file report Oct 79-Mar 81

    International Nuclear Information System (INIS)

    Toth, G.W.; Annett, J.R.

    1981-03-01

    This report presents the results of an assessment of uranium in situ leach mining costs through the application of process engineering and discounted cash flow analysis procedures. A computerized costing technique was developed to facilitate rapid cost analyses. Applications of the cost model will generate mine life capital and operating costs as well as solve for economic production cost per pound U 3 O 8 . Conversely, rate of return may be determined subject to a known selling price. The data bases of the cost model were designed to reflect variations in Texas versus Wyoming site applications. The results of applying the model under numerous ore deposit, operating, well field, and extraction plant conditions for Texas and Wyoming are summarized in the report. Sensitivity analysis of changes in key project parameters have also been tested and are included

  11. The Astronomy Genealogy Project: A Progress Report

    Science.gov (United States)

    Tenn, Joseph S.

    2016-01-01

    Although it is not yet visible, much progress has been made on the Astronomy Genealogy Project (AstroGen) since it was accepted as a project of the Historical Astronomy Division (HAD) three years ago. AstroGen will list the world's astronomers with information about their highest degrees and advisors. (In academic genealogy, your thesis advisor is your parent.) A small group (the AstroGen Team) has compiled a database of approximately 12,000 individuals who have earned doctorates with theses (dissertations) on topics in astronomy, astrophysics, cosmology, or planetary science. These include nearly all those submitted in Australia, Canada, the Netherlands, and New Zealand, and most of those in the United States (all through 2014 for most universities and all through 1990 for all). We are compiling more information than is maintained by the Mathematics Genealogy Project (MGP). In addition to name, degree, university, year of degree, and thesis advisor(s), all provided by MGP as well, we are including years of birth and death when available, mentors in addition to advisors, and links to the thesis when it is online and to the person's web page or obituary, when we can find it. We are still struggling with some questions, such as the boundaries of inclusion and whether or not to include subfields of astronomy. We believe that AstroGen will be a valuable resource for historians of science as well as a source of entertainment for those who like to look up their academic family trees. A dedicated researcher following links from AstroGen will be able to learn quite a lot about the careers of astronomy graduates of a particular university, country, or era. We are still seeking volunteers to enter the graduates of one or more universities.

  12. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  13. Final Report - Stationary and Emerging Market Fuel Cell System Cost Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Contini, Vince [Battelle Memorial Inst., Columbus, OH (United States); Heinrichs, Mike [Battelle Memorial Inst., Columbus, OH (United States); George, Paul [Battelle Memorial Inst., Columbus, OH (United States); Eubanks, Fritz [Battelle Memorial Inst., Columbus, OH (United States); Jansen, Mike [Battelle Memorial Inst., Columbus, OH (United States); Valluri, Manoj [Battelle Memorial Inst., Columbus, OH (United States); Mansouri, Mahan [Battelle Memorial Inst., Columbus, OH (United States); Swickrath, Mike [Battelle Memorial Inst., Columbus, OH (United States)

    2017-04-30

    The U.S. Department of Energy (DOE) is focused on providing a portfolio of technology solutions to meet energy security challenges of the future. Fuel cells are a part of this portfolio of technology offerings. To help meet these challenges and supplement the understanding of the current research, Battelle has executed a five-year program that evaluated the total system costs and total ownership costs of two technologies: (1) an ~80 °C polymer electrolyte membrane fuel cell (PEMFC) technology and (2) a solid oxide fuel cell (SOFC) technology, operating with hydrogen or reformate for different applications. Previous research conducted by Battelle, and more recently by other research institutes, suggests that fuel cells can offer customers significant fuel and emission savings along with other benefits compared to incumbent alternatives. For this project, Battelle has applied a proven cost assessment approach to assist the DOE Fuel Cell Technologies Program in making decisions regarding research and development, scale-up, and deployment of fuel cell technology. The cost studies and subsequent reports provide accurate projections of current system costs and the cost impact of state-of-the-art technologies in manufacturing, increases in production volume, and changes to system design on system cost and life cycle cost for several near-term and emerging fuel cell markets. The studies also provide information on types of manufacturing processes that must be developed to commercialize fuel cells and also provide insights into the optimization needed for use of off-the-shelf components in fuel cell systems. Battelle’s analysis is intended to help DOE prioritize investments in research and development of components to reduce the costs of fuel cell systems while considering systems optimization.

  14. Emergency Fish Restoration Project; Final Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  15. The MAJORANA Project: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Steven Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-09

    This series of slides presents the topic under the following aspects: ββ sensitivity, underground laboratory, shield, monoliths, strings, detectors, electroformed small parts, and background. Assembly and construction are proceeding at Sanford Davis Campus laboratory. Based on assays, material backgrounds are projected to meet cleanliness goals. Module 1 is complete. Electroformed copper has just been completed at SURF and PNNL. The shield is nearly complete. Successful reduction and refinement of enrGe has taken place with 98% yield. AMTEK (ORTEC) has produced 27 kg within 32 detectors from the reduced/refined enrGe; 30 of these are underground at SURF being assembled into strings.

  16. West Valley Demonstration Project annual report

    International Nuclear Information System (INIS)

    1986-01-01

    In FY 1985 the most challenging goal of the Project to date, the start of verification testing of major subsystems of the Vitrification System, was accomplished. Individual testing of subsystems was completed in FY 1985 allowing for the start of integrated testing of all major portions of the Vitrification System. Other accomplishments during this period included completion of cleanup of the first of several former reprocessing cells, the first phase of testing and operation of the system which will solidify low-level liquid wastes and the beginning of construction to support installation of the Supernatant Treatment System which will be used to remove the radioactive fission products from the supernatant

  17. Final Report. Montpelier District Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Baker, Jessie [City of Montpelier Vermont, Montpelier, VT (United States). Dept. of Public Works; Motyka, Kurt [City of Montpelier Vermont, Montpelier, VT (United States). Dept. of Public Works; Aja, Joe [State of Vermont, Montpelier, VT (United States). Dept. of Buildings and General Services; Garabedian, Harold T. [Energy & Environmental Analytics, Montpelier, VT (United States)

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  18. Fairbanks Geothermal Energy Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Bernie [CHSR,LLC Owner

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  19. Status report on the NESC1 project

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R C; McGarry, D [European Commission Joint Research Centre Petten (Netherlands); Wintle, J [AEA Technology, Risley (United Kingdom); Hemsworth, B [HSE Nuclear Installations Inspectorate Bootle, Merseyside (United Kingdom)

    1997-09-01

    The Spinning Cylinder Project is the first joint international collaboration of the Network for Evaluating Steel Components (NESC) and is based around a large scale spinning cylinder test. This paper summarizes how the test conditions were defined and analysed, and how a method for detecting the moment of crack growth was developed. Now that the test has been successfully completed, the complex evaluation procedures can be commenced. The results of the test will constitute an important international benchmark for the understanding and validation of fracture methodologies used by the nuclear industry to assess reactor pressure vessels against pressurized thermal shock. (author). 13 refs, 3 figs.

  20. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs