  1. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  2. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  3. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  4. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  5. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    International Nuclear Information System (INIS)

    Shonder, John A.; Hughes, Patrick; Atkin, Erica

    2006-01-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipment prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.

  6. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  7. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  8. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  9. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  10. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  11. Social cost impact assessment of pipeline infrastructure projects

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, John C., E-mail: matthewsj@battelle.org [Battelle, 7231 Palmetto Dr, Baton Rouge, LA 70808 (United States); Allouche, Erez N., E-mail: allouche@latech.edu [Louisiana Tech University (United States); Sterling, Raymond L., E-mail: sterling@latech.edu [Louisiana Tech University (United States)

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  12. Social cost impact assessment of pipeline infrastructure projects

    International Nuclear Information System (INIS)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-01

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors

  13. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-03-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $210.6 million, total reported cost savings were $215.1 million, and total guaranteed cost savings were $204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

  14. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  15. Final Report: Hydrogen Storage System Cost Analysis

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); Houchins, Cassidy [Strategic Analysis Inc., Arlington, VA (United States); Huya-Kouadio, Jennie Moton [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel A. [Strategic Analysis Inc., Arlington, VA (United States)

    2016-09-30

    The Fuel Cell Technologies Office (FCTO) has identified hydrogen storage as a key enabling technology for advancing hydrogen and fuel cell power technologies in transportation, stationary, and portable applications. Consequently, FCTO has established targets to chart the progress of developing and demonstrating viable hydrogen storage technologies for transportation and stationary applications. This cost assessment project supports the overall FCTO goals by identifying the current technology system components, performance levels, and manufacturing/assembly techniques most likely to lead to the lowest system storage cost. Furthermore, the project forecasts the cost of these systems at a variety of annual manufacturing rates to allow comparison to the overall 2017 and “Ultimate” DOE cost targets. The cost breakdown of the system components and manufacturing steps can then be used to guide future research and development (R&D) decisions. The project was led by Strategic Analysis Inc. (SA) and aided by Rajesh Ahluwalia and Thanh Hua from Argonne National Laboratory (ANL) and Lin Simpson at the National Renewable Energy Laboratory (NREL). Since SA coordinated the project activities of all three organizations, this report includes a technical description of all project activity. This report represents a summary of contract activities and findings under SA’s five year contract to the US Department of Energy (Award No. DE-EE0005253) and constitutes the “Final Scientific Report” deliverable. Project publications and presentations are listed in the Appendix.

  16. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  17. 14 CFR 151.41 - Project costs.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...

  18. The projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2010-10-01

    This paper describes the outcomes from the joint report between the Nuclear Energy Agency and the International Energy Agency of the OECD on the projected costs of generating electricity. The study contains data on electricity generating costs for almost 200 power plants provided by 17 OECD member countries, 4 non-OECD countries and 4 industrial companies or industry organisations. The paper presents the projected costs of generating electricity calculated according to common methodological rules on the basis of the data provided by participating countries and organisations. Data were received for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. Cost estimates were also provided for combined heat and power plants, as well as for coal plants that include carbon capture. As in previous studies of the same series, all costs and benefits were discounted or capitalised to the date of commissioning in order to calculate the state of the electricity costs per MWh, based on plant operating lifetime data. In addition, the paper contains a discussion of a number of factors affecting the cost of capital, the outlook for carbon capture and storage and the working of electricity markets. (Author)

  19. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  20. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  1. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  2. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  3. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  4. Research on the Investment Costs of IT Project

    Science.gov (United States)

    Zurong, Chen; Feng, Jingchun

    2018-02-01

    The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.

  5. Flexible resource management and its effect on project cost and duration

    Science.gov (United States)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  6. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  7. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  8. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  9. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  10. Projected costs of generating electricity

    International Nuclear Information System (INIS)

    2005-01-01

    Previous editions of Projected Costs of Generating Electricity have served as the reference in this field for energy policy makers, electricity system analysts and energy economists. The study is particularly timely in the light of current discussions of energy policy in many countries. The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today and considered by participating countries as candidates for commissioning by 2010-2015 or earlier. Investors and other decision makers will also need to take the full range of other factors into account (such as security of supply, risks and carbon emissions) when selecting an electricity generation technology. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut ''winner''. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. An appendix to the report provides country statements on generation technologies and costs. Previous studies in the series were published in 1983, 1986, 1990, 1993 and 1998. (author)

  11. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  12. 10 CFR 611.102 - Eligible project costs.

    Science.gov (United States)

    2010-01-01

    ... Accounting Principles and these costs may be considered by DOE in determining the Borrower's contribution to... 10 Energy 4 2010-01-01 2010-01-01 false Eligible project costs. 611.102 Section 611.102 Energy... PROGRAM Direct Loan Program § 611.102 Eligible project costs. (a) Eligible costs are: (1) Those costs that...

  13. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  14. The cost of wetland creation and restoration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    King, D.; Bohlen, C.

    1995-08-01

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  15. Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jones-Albertus, Rebecca [U.S. Department of Energy

    2018-04-02

    The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as well as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.

  16. The Problem with the Delta Cost Project Database

    Science.gov (United States)

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  17. Final Report: Hydrogen Production Pathways Cost Analysis (2013 – 2016)

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel Allan [Strategic Analysis Inc., Arlington, VA (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-30

    This report summarizes work conducted under a three year Department of Energy (DOE) funded project to Strategic Analysis, Inc. (SA) to analyze multiple hydrogen (H2) production technologies and project their corresponding levelized production cost of H2. The analysis was conducted using the H2A Hydrogen Analysis Tool developed by the DOE and National Renewable Energy Laboratory (NREL). The project was led by SA but conducted in close collaboration with the NREL and Argonne National Laboratory (ANL). In-depth techno-economic analysis (TEA) of five different H2 production methods was conducted. These TEAs developed projections for capital costs, fuel/feedstock usage, energy usage, indirect capital costs, land usage, labor requirements, and other parameters, for each H2 production pathway, and use the resulting cost and system parameters as inputs into the H2A discounted cash flow model to project the production cost of H2 ($/kgH2). Five technologies were analyzed as part of the project and are summarized in this report: Proton Exchange Membrane technology (PEM), High temperature solid oxide electrolysis cell technology (SOEC), Dark fermentation of biomass for H2 production, H2 production via Monolithic Piston-Type Reactors with rapid swing reforming and regeneration reactions, and Reformer-Electrolyzer-Purifier (REP) technology developed by Fuel Cell Energy, Inc. (FCE).

  18. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  19. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  20. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  1. Final report: Compiled MPI. Cost-Effective Exascale Application Development

    Energy Technology Data Exchange (ETDEWEB)

    Gropp, William Douglas [Univ. of Illinois, Urbana-Champaign, IL (United States)

    2015-12-21

    This is the final report on Compiled MPI: Cost-Effective Exascale Application Development, and summarizes the results under this project. The project investigated runtime enviroments that improve the performance of MPI (Message-Passing Interface) programs; work at Illinois in the last period of this project looked at optimizing data access optimizations expressed with MPI datatypes.

  2. Health sector costs of self-reported food allergy in Europe: a patient-based cost of illness study

    NARCIS (Netherlands)

    Mugford, M.; Fox, M.; Voordouw, J.; Cornelisse-Vermaat, J.R.; Antonides, G.; Hoz Caballer, de la B.

    2013-01-01

    Introduction: Food allergy is a recognized health problem, but little has been reported on its cost for health services. The EuroPrevall project was a European study investigating the patterns, prevalence and socio-economic cost of food allergy. Aims: To investigate the health service cost for

  3. Health sector costs of self-reported food allergy in Europe : A patient-based cost of illness study

    NARCIS (Netherlands)

    Fox, Margaret; Mugford, Miranda; Voordouw, Jantine; Cornelisse-Vermaat, Judith; Antonides, Gerrit; de la Hoz Caballer, Belen; Cerecedo, Inma; Zamora, Javier; Rokicka, Ewa; Jewczak, Maciej; Clark, Allan B; Kowalski, Marek L; Papadopoulos, Nikos; Knulst, Anna C; Seneviratne, Suranjith; Belohlavkova, Simona; Asero, Roberto; de Blay, Frederic; Purohit, Ashok; Clausen, Michael; Flokstra de Blok, Bertine; Dubois, Anthony E; Fernandez-Rivas, Montserrat; Burney, Peter; Frewer, Lynn J; Mills, Clare E N

    2013-01-01

    Introduction: Food allergy is a recognized health problem, but little has been reported on its cost for health services. The EuroPrevall project was a European study investigating the patterns, prevalence and socio-economic cost of food allergy. Aims: To investigate the health service cost for

  4. What Causes Cost Overrun in Transport Infrastructure Projects?

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    cost escalation for three types of project ownership - private, state-owned enterprise and other public ownership - it is shown that the oft-seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. Type of accountability......This article presents results from the first statistically significant study of causes of cost escalation in transport infrastructure projects. The study is based on a sample of 258 rail, bridge, tunnel and roads projects worth US$90 billion. The focus is on the dependence of cost escalation on (1......) length of project implementation phase, (2) size of project and (3) type of project ownership. First, it is found with very high statistical significance that cost escalation is strongly dependent on length of implementation phase. The policy implications are clear: Decision makers and planners should...

  5. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  6. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  7. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  8. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  9. Budget Period 1 Summary Report: Hywind Maine Project

    Energy Technology Data Exchange (ETDEWEB)

    Keiser, Meagan [Statoil, Stavanger (Norway)

    2014-02-28

    In accordance with the Statement of Project Objectives (SOPO) agreed to between the Department of Energy (“DOE”) and Statoil for the Hywind Maine project, Statoil hereby submits a Budget Period 1 Summary Report which includes accomplishments for the project. The report includes summaries of the other submitted reports (see Section 1.2-2) and progress regarding innovations leading to potential reductions in the Cost of Energy (see Section 3). The Hywind Demo project, the world’s first full-scale 2.3 megawatts (MW) floating wind turbine, installed at a water depth of 200 meter (m), 10 kilometer (km) off the coast of Norway, has proven that the Hywind floating substructure is a suitable platform for conventional multi- MW turbines. A principal goal of the Hywind Maine Project was to leverage that experience, both to demonstrate the commercial feasibility of the technology and to further develop and optimize the technology all in order to bring the costs down in a larger scale development. With the Hywind Maine Project, Statoil planned to deploy four turbines of 3 MW in approximately 140 meters water depth. Although the project in Maine will not move forward, much value was gained through the BP1 work package. Advanced modeling related to the design basis, which will have applicability beyond the Maine project, was completed. In addition, initial supply chain analyses were conducted, which will help assist with development of updated cost of energy models. Geophysical and various environmental surveys were also conducted, the results of which Statoil has committed to share publicly, and which will help build a database of information that future developers may be able to access. Finally, Statoil gained a greater understanding of the US offshore wind industry and related markets, which will assist the company as it looks for full-scale, commercial opportunities.

  10. Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

    Energy Technology Data Exchange (ETDEWEB)

    Slattery, Bob S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-01-01

    The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

  11. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  12. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  13. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  14. Cost benchmarking of railway projects in Europe – can it help to reduce costs?

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Nielsen, Otto Anker

    a certain overview of the range of costs in various budget disciplines. The Copenhagen-Ringsted project is shown to be right in the middle of the range in terms of total costs per kilometre, and its values in the discipline comparisons do not significantly differ from the values of the less expensive...... projects. Deeper analysis of project unit costs is still continuing, but the preliminary results show that the cost values for projects located in the same geographical zone are similar. For example, this can be explained by their use of the same construction companies. However, unit prices in southern...

  15. Historical and projected costs of natural disasters

    Energy Technology Data Exchange (ETDEWEB)

    Engi, D.

    1995-04-01

    Natural disasters cause billions of dollars of damage and thousands Of deaths globally each year. While the magnitude is clear, the exact costs (in damage and fatalities) are difficult to clearly identify. This document reports on the results of a survey of data on the costs associated with significant natural disasters. There is an impressive amount of work and effort going into natural disaster research, mitigation, and relief. However, despite this effort, there are surprisingly few consistent and reliable data available regarding the effects of natural disasters. Even lacking consistent and complete data, it is clear that the damage and fatalities from natural disasters are increasing, both in the United States, and globally. Projections using the available data suggest that, in the United States alone, the costs of natural disasters between 1995 and 2010 will be in the range of $90 billion (94$) and 5000 lives.

  16. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  17. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  18. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  19. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  20. Ceramic Technology Project. Semiannual progress report for April 1993 through September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Ceramic Technology Project was originally developed by the Department of Energy`s Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS`s Materials Development Program, was developed to meet the ceramic technology requirements of the OTS`s automotive technology programs. During the course of the Ceramic Technology Project, remarkable progress has been made in the development of reliable structural ceramics. However, further work is needed to reduce the cost of ceramics to facilitate their commercial introduction, especially in the highly cost-sensitive automotive market. The work described in this report is organized according to the following WBS project elements: Project Management and Coordination; Materials and Processing; Materials Design Methodology; Data Base and Life Prediction; and Technology Transfer. This report includes contributions from all currently active project participants. Separate abstracts were prepared for the 47 projects reported here.

  1. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  2. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  3. Cost Finding Principles and Procedures. Preliminary Field Review Edition. Technical Report 26.

    Science.gov (United States)

    Ziemer, Gordon; And Others

    This report is part of the Larger Cost Finding Principles Project designed to develop a uniform set of standards, definitions, and alternative procedures that will use accounting and statistical data to find the full cost of resources utilized in the process of producing institutional outputs. This technical report describes preliminary procedures…

  4. HET/JUPITER project assessment report

    International Nuclear Information System (INIS)

    Baxter, B.J.; Harrington, F.E.; Kaiser, G.G.; Wolf, J.

    1979-05-01

    This report is an assessment of the United States' Hot Engineering Test (HET) and the Federal Republic of Germany's Juelich Pilot Plant Thorium Element Reprocessing (JUPITER) Projects. The assessment was conducted with a view to developing mutually supportive roles in the achievement of hot engineering test objectives. Conclusions of the assessment are positive and identify several technical areas with potential for US/FRG cooperation. Recommendations presented in this report support a cost-effective US/FRG program to jointly develop high temperature gas-cooled reactor fuel recycle technology. (orig.) [de

  5. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  6. Severn Barrage project. Detailed report - V. 5

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    Prior to the present programme of work, the effects which a tidal power barrage would have on the region, during both construction and operation, had not been studied in detail. This volume of the Detailed Report therefore represents a significant extension of work into these aspects of the Severn Barrage Project. In the Regional Study, a number of benefits have been identified, some of which may represent net benefits nationally. The economic assessment of both regional and national benefits and costs is presented. The second part of this volume reports on the work done on the Legal Background for the Project. (author).

  7. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  8. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  9. Subject Access Project. Third Quarterly Report.

    Science.gov (United States)

    Atherton, Pauline

    This third quarterly report for the period January to March 1977 describes the production schedule, records, and estimated costs and times in creating the Subject Access Project data base. Plans for on-line use of the data base and search strategy design are outlined. A table of specifications for preparing the data base for on-line searching is…

  10. The Hidden Cost of Regulation: The Administrative Cost of Reporting Serious Reportable Events.

    Science.gov (United States)

    Blanchfield, Bonnie B; Acharya, Bijay; Mort, Elizabeth

    2018-04-01

    More than half of the 50 states (27) and the District of Columbia require reporting of Serous Reportable Events (SREs). The goal is to hold providers accountable and improve patient safety, but there is little information about the administrative cost of this reporting requirement. This study was conducted to identify costs associated with investigating and reporting SREs. This qualitative study used case study methods that included interviewing staff and review of data and documents to investigate each SRE occurring at one academic medical center during fiscal year 2013. A framework of tasks and a model to categorize costs was created. Time was summarized and costs were estimated for each SRE. The administrative cost to process 44 SREs was estimated at $353,291, an average cost of $8,029 per SRE, ranging $6,653 for an environmental-related SRE to $21,276 for a device-related SRE. Care management SREs occurred most frequently, costing an average $7,201 per SRE. Surgical SREs, the most expensive on average, cost $9,123 per SRE. Investigation of events accounted for 64.5% of total cost; public reporting, 17.2%; internal reporting, 10.2%; finance and administration, 6.0%; and 2.1%, other. Even with 26 states mandating reporting, the 17.2% incremental cost of public reporting is substantial. Policy makers should consider the opportunity costs of these resources, averaging $8,029 per SRE, when mandating reporting. The benefits of public reporting should be collectively reviewed to ensure that the incremental costs in this resource-constrained environment continue to improve patient safety and that trade-offs are acknowledged. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  11. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  12. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  13. Medicare Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Medicare certified institutional providers are required to submit an annual cost report to a Medicare Administrative Contractor. The cost report contains provider...

  14. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  15. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  16. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  17. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  18. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  19. Array automated assembly task low cost silicon solar array project. Phase 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Clayton

    1980-12-01

    The initial contract was a Phase II Process Development for a process sequence, but with concentration on two particular process steps: laserscribing and spray-on junction formation. The add-on portion of the contract was to further develop these tasks, to incorporate spray-on of AR Coating and aluminum and to study the application of microwave energy to solar cell fabrication. The overall process cost projection is 97.918 cents/Wp. The major contributor to this excess cost is the module encapsulation materials cost. During the span of this contract the study of microwave application to solar cell fabrication produced the ability to apply this technique to any requirement of 600/sup 0/C or less. Above this temperature, non-uniformity caused the processing to be unreliable. The process sequence is described in detail, and a SAMICS cost analysis for each valid process step studied is presented. A temporary catalog for expense items is included, and engineering specifications for the process steps are given. (WHK)

  20. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  1. How much does it cost? The LIFE Project - Costing Models for Digital Curation and Preservation

    Directory of Open Access Journals (Sweden)

    Richard Davies

    2007-11-01

    Full Text Available Digital preservation is concerned with the long-term safekeeping of electronic resources. How can we be confident of their permanence, if we do not know the cost of preservation? The LIFE (Lifecycle Information for E-Literature Project has made a major step forward in understanding the long-term costs in this complex area. The LIFE Project has developed a methodology to model the digital lifecycle and to calculate the costs of preserving digital information for the next 5, 10 or 100 years. National and higher education (HE libraries can now apply this process and plan effectively for the preservation of their digital collections. Based on previous work undertaken on the lifecycles of paper-based materials, the LIFE Project created a lifecycle model and applied it to real-life digital collections across a diverse subject range. Three case studies examined the everyday operations, processes and costs involved in their respective activities. The results were then used to calculate the direct costs for each element of the digital lifecycle. The Project has made major advances in costing preservation activities, as well as making detailed costs of real digital preservation activities available. The second phase of LIFE (LIFE2, which recently started, aims to refine the lifecycle methodology and to add a greater range and breadth to the project with additional exemplar case studies.

  2. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  3. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  4. Cost estimates for near-term depolyment of advanced traffic management systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, S.S.; Chin, S.M.

    1993-02-15

    The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

  5. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  6. Genetic algorithm for project time-cost optimization in fuzzy environment

    Directory of Open Access Journals (Sweden)

    Khan Md. Ariful Haque

    2012-12-01

    Full Text Available Purpose: The aim of this research is to develop a more realistic approach to solve project time-cost optimization problem under uncertain conditions, with fuzzy time periods. Design/methodology/approach: Deterministic models for time-cost optimization are never efficient considering various uncertainty factors. To make such problems realistic, triangular fuzzy numbers and the concept of a-cut method in fuzzy logic theory are employed to model the problem. Because of NP-hard nature of the project scheduling problem, Genetic Algorithm (GA has been used as a searching tool. Finally, Dev-C++ 4.9.9.2 has been used to code this solver. Findings: The solution has been performed under different combinations of GA parameters and after result analysis optimum values of those parameters have been found for the best solution. Research limitations/implications: For demonstration of the application of the developed algorithm, a project on new product (Pre-paid electric meter, a project under government finance launching has been chosen as a real case. The algorithm is developed under some assumptions. Practical implications: The proposed model leads decision makers to choose the desired solution under different risk levels. Originality/value: Reports reveal that project optimization problems have never been solved under multiple uncertainty conditions. Here, the function has been optimized using Genetic Algorithm search technique, with varied level of risks and fuzzy time periods.

  7. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  8. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  9. Project feasibility and mine production costs

    Energy Technology Data Exchange (ETDEWEB)

    Longworth, C R

    1987-01-01

    The paper outlines the present investment environment existing in the Australian Coal Industry and places this in the context of the current world seaborne coal trade. Those factors which have the greatest influence on the viability of coal projects today, namely coal prices and quality, exchange rates, cash cost of production, capital and borrowing costs, infrastructure and government charges are dealt with briefly. The paper concludes by giving a schedule of those factors of a local character which can be changed to render projects more competitive and also presents some external factors beyond Australia's control which will, in part, influence the development of the industry in the next decade. 4 refs., 8 figs.

  10. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    At the request of Enova (the 'Client'), Garrad Hassan and Partners Limited ('GH') has provided technical advice on capital cost expectations for wind farm developments. In summary, the work provides a survey of the present and future 5-year prognosis for costs and conditions facing developers and suppliers in the European wind power market. The report will be used as a benchmark to support tendering for future Norwegian projects. As such, it will also provide discussion of how project characteristics can influence project cost. Data Used in the Analysis GH has obtained data on the investment costs for 35 projects developed or in development in Europe. The projects represent to the extent possible the characteristics representative of potential Norwegian projects. The data used in this analysis are from actual projects in: France, Germany, Hungary, Ireland, Italy, Northern Ireland, Portugal, Scotland, Spain and Wales. The turbine capacities represented in the data are typically 2 MW or above, except in one case where a mix of turbines sizes was used at the project. GH highlights that because of high demand for turbines, the main manufacturers have recently been offering to meet delivery schedules for new orders from late 2010. For new tenders it is likely that delivery time frames offered will now be for 2011 deliveries. As a result of the current 'Seller's Market', production capacity typically relates directly to the number of turbines sold in the year; therefore for 2007 the annual production capacity was approximately 22 GW. GH is aware that turbine suppliers across the market are working to increase their production capacity in order to ease the pressure on the market, however, there are bottlenecks through the supply chain at the sub component level. As a result, increases in production capacity will likely remain at a relatively steady state in the short term. Energy Assessment The energy assessment of a project is the area

  11. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  12. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  13. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  14. Electrification Futures Study: End-Use Electric Technology Cost and Performance Projections through 2050

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, Laura J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jadun, Paige [National Renewable Energy Lab. (NREL), Golden, CO (United States); McMillan, Colin A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Steinberg, Daniel C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Muratori, Matteo [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu T. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-02

    This report provides projected cost and performance assumptions for electric technologies considered in the Electrification Futures Study, a detailed and comprehensive analysis of the effects of widespread electrification of end-use service demands in all major economic sectors - transportation, residential and commercial buildings, and industry - for the contiguous United States through 2050. Using extensive literature searches and expert assessment, the authors identify slow, moderate, and rapid technology advancement sensitivities on technology cost and performance, and they offer a comparative analysis of levelized cost metrics as a reference indicator of total costs. The identification and characterization of these end-use service demand technologies is fundamental to the Electrification Futures Study. This report, the larger Electrification Futures Study, and the associated data and methodologies may be useful to planners and analysts in evaluating the potential role of electrification in an uncertain future. The report could be broadly applicable for other analysts and researchers who wish to assess electrification and electric technologies.

  15. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Science.gov (United States)

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  16. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  17. Projected Costs of Generating Electricity

    International Nuclear Information System (INIS)

    Plante, J.

    1998-01-01

    Every 3 to 4 years, the NEA undertakes a study on projected costs of generating electricity in OECD countries. This started in 1983 and the last study (1997) has just be completed. All together 5 studies were performed, the first three dealing with nuclear and coal options, while the 1992 and 1997 included also the gas option. The goal of the study is to compare, country by country, generating costs of nuclear, coal-fired and gas-fired power plants that could be commissioned in the respondent countries by 2005-2010

  18. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  19. Retrospective Study of the Costs of EPA Regulations: A Report of Four Case Studies (2014)

    Science.gov (United States)

    Report discusses the factors that may account for differences between projected and actual regulatory costs and presents the findings of four case studies that attempt to assess compliance cost retrospectively.

  20. Ceramic Technology Project semiannual progress report, October 1992--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, D.R.

    1993-09-01

    This project was developed to meet the ceramic technology requirements of the OTS`s automotive technology programs. Although progress has been made in developing reliable structural ceramics, further work is needed to reduce cost. The work described in this report is organized according to the following work breakdown structure project elements: Materials and processing (monolithics [Si nitride, carbide], ceramic composites, thermal and wear coatings, joining, cost effective ceramic machining), materials design methodology (contact interfaces, new concepts), data base and life prediction (structural qualification, time-dependent behavior, environmental effects, fracture mechanics, nondestructive evaluation development), and technology transfer.

  1. Identifying an Australian ‘Shadow’ Benefit / Cost Ratio for Public Projects

    OpenAIRE

    Lawrence, Craig

    2009-01-01

    This paper examines the social opportunity cost of a hypothetical public project in Australia and compares these values with the cost of the project as measured by factor prices. Since 2001, the Australian taxation system has included an ad valorem tax, the Goods and Services Tax, however relatively little analysis of the impact of this tax on public project evaluation methods has been undertaken. This tax creates divergences between social opportunity cost and conventional cost measures. The...

  2. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  3. Final Project Report for DOE/EERE High-Capacity and Low-Cost Hydrogen-Storage Sorbents for Automotive Applications

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Hong-Cai [Texas A & M Univ., College Station, TX (United States); Liu, Di-Jia [Texas A & M Univ., College Station, TX (United States)

    2017-12-01

    This report provides a review of the objectives, progress, and milestones of the research conducted during this project on the topic of developing innovative metal-organic frameworks (MOFs) and porous organic polymers (POPs) for high-capacity and low-cost hydrogen-storage sorbents in automotive applications.1 The objectives of the proposed research were to develop new materials as next-generation hydrogen storage sorbents that meet or exceed DOE’s 2017 performance targets of gravimetric capacity of 0.055 kg H2/kgsystem and volumetric capacity of 0.040 kg H2/Lsystem at a cost of $400/kg H2 stored. Texas A&M University (TAMU) and Argonne National Laboratory (ANL) collaborated in developing low-cost and high-capacity hydrogen-storage sorbents with appropriate stability, sorption kinetics, and thermal conductivity. The research scope and methods developed to achieve the project’s goals include the following: Advanced ligand design and synthesis to construct MOF sorbents with optimal hydrogen storage capacities, low cost and high stability; Substantially improve the hydrogen uptake capacity and chemical stability of MOF-based sorbents by incorporating high valent metal ions during synthesis or through the post-synthetic metal metathesis oxidation approach; Enhance sorbent storage capacity through material engineering and characterization; Generate a better understanding of the H2-sorbent interaction through advanced characterization and simulation. Over the course of the project 5 different MOFs were developed and studied: PCN-250, PCN-12, PCN-12’, PCN-608 and PCN-609.2-3 Two different samples were submitted to the National Renewable Energy Laboratory (NREL) in order to validate their hydrogen adsorption capacity, PCN-250 and PCN-12. Neither of these samples reached the project’s Go/No-Go requirements but the data obtained did further prove the hypothesis that the presence of open metal

  4. Monthly Program Cost Report (MPCR)

    Data.gov (United States)

    Department of Veterans Affairs — The Monthly Program Cost Report (MPCR) replaces the Cost Distribution Report (CDR). The MPCR provides summary information about Veterans Affairs operational costs,...

  5. Automotive Manufacturers' Cost/Revenue, Financial and Risk Analysis : Projected Impact of Automobile Manufacturing on the Plastics Industry

    Science.gov (United States)

    1979-08-01

    The report is part of a study to update the historical and projected cost/revenue analysis of the U.S. domestic automobile manufacturers. It includes the evaluation of the historical and projected financial data to assess the corporate financial posi...

  6. Parent Early Evaluation of Kids: PEEK Outreach Training Project. Final Report.

    Science.gov (United States)

    Squires, Jane; Twombly, Liz; Yockelson, Sue

    This report describes achievements and activities of the Parent Early Evaluation of Kids (PEEK) Outreach Project at the University of Oregon. This project focused on assisting state agencies, regional and tribal entities, and local health and education programs to develop comprehensive, low-cost systems for child-find and referral. Rural and inner…

  7. Annual Report, Fall 2016: Identifying Cost Effective Tank Waste Characterization Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Reboul, S. H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); DiPrete, D. P. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-12-12

    This report documents the activities that were performed during the second year of a project undertaken to improve the cost effectiveness and timeliness of SRNL’s tank closure characterization practices. The activities performed during the first year of the project were previously reported in SRNL-STI-2015-00144. The scope of the second year activities was divided into the following three primary tasks: 1) develop a technical basis and strategy for improving the cost effectiveness and schedule of SRNL’s tank closure characterization program; 2) initiate the design and assembly of a new waste removal system for improving the throughput and reducing the personnel dose associated with extraction chromatography radiochemical separations; and 3) develop and perform feasibility testing of three alternative radiochemical separation protocols holding promise for improving high resource demand/time consuming tank closure sample analysis methods.

  8. Healthcare Cost and Utilization Project (HCUP)

    Science.gov (United States)

    The Healthcare Cost and Utilization Project is a family of health care databases and related software tools and products developed through a Federal-State-Industry partnership and sponsored by the Agency for Healthcare Research and Quality.

  9. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  10. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  11. Town of Edinburg landfill reclamation demonstration project. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County, with majority funding provided by the New York State Energy Research and Development Authority. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified

  12. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  13. Final Report: Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications (2012-2016)

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); Huya-Kouadio, Jennie Moton [Strategic Analysis Inc., Arlington, VA (United States); Houchins, Cassidy [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel Allen [Strategic Analysis Inc., Arlington, VA (United States)

    2016-09-01

    This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.

  14. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  15. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  16. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  17. The Stripa project annual report 1984

    International Nuclear Information System (INIS)

    1985-07-01

    This is an autonomous OECD/NEA project relating to the final disposal of highly radioactive waste. Research is being performed in a granite formation 350 m below the ground surface. The first phase consists of three parts, namely hydrogeological and hydrogeochemical investigations in boreholes, tracer migration tests and large-scale tests of the behaviour of backfill material. The second phase includes the following investigations: detection and characterization of fracture zones, sealing of boreholes and shafts, hydrogoelogical characterization of the Stripa site and isotopic characterization of its groundwaters. The estimated cost of both phases is 111 MSEK and they are scheduled for completion in 1986. A summary of the progress of the project phase I and phase II is given in this report. (G.B.)

  18. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  19. Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations

    Directory of Open Access Journals (Sweden)

    Hans Lind

    2014-09-01

    Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project.   Keywords: Cost overruns, Infrastructure projects, Policy measures

  20. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    Science.gov (United States)

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  1. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  2. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    of Engineering, the Built. Environment, and .... works; identification of causes of cost overruns, as well as the control measures for .... project; poor project schedules and management; increases in the prices of .... conclusion, the magnitude of the cost overrun was reduced after ..... Research in Business, 3(11), pp. 775-780.

  3. 40 CFR 35.925-18 - Limitation upon project costs incurred prior to award.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Limitation upon project costs incurred...-Clean Water Act § 35.925-18 Limitation upon project costs incurred prior to award. That project... project costs in the following cases: (1) Step 1 work begun after the date of approval by the Regional...

  4. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  5. Dynamic Cost-Contingency Management: A Method for Reducing Project Costs While Increasing the Probability of Success

    National Research Council Canada - National Science Library

    Kujawski, Edouard

    2007-01-01

    In the real world, "Money Allocated is Money Spent" (MAIMS). As a consequence, cost underruns are rarely available to protect against cost overruns, while task overruns are passed on to the total project cost...

  6. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  7. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  8. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  9. Cost Reporting at a Navy Branch Clinic

    Science.gov (United States)

    1993-03-01

    John Wiley & Sons, 1991. 15 Horngren , Charles, Cost Accounting -=A Managerial Emphasis, 5th Edition, Prentice Hall, Inc., Englewood Cliffs, N.J., 1982...traditionally reported under a partial cost reporting system. By applying basic principles of managerial accounting , a full cost reporting system is...traditionally reported under a partial cost reporting system. By applying basic principles of managerial accounting , a proposed full cost reporting

  10. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  11. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  12. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  13. Projected Lifetime Healthcare Costs Associated with HIV Infection

    DEFF Research Database (Denmark)

    Nakagawa, Fumiyo; Miners, Alec; Smith, Colette J

    2015-01-01

    computer simulation model to project the distribution of lifetime outcomes and costs of men-who-have-sex-with-men (MSM) infected with HIV in 2013 aged 30, over 10,000 simulations. We assumed a resource-rich setting with no loss to follow-up, and that standards and costs of healthcare management remain...

  14. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  15. The cost of wetland creation and restoration. Final report, [February 12, 1992--April 30, 1994]- Draft

    Energy Technology Data Exchange (ETDEWEB)

    King, D.; Costanza, R.

    1994-07-11

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  16. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    OpenAIRE

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is a...

  17. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  18. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  19. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  20. Technical Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    Energy Technology Data Exchange (ETDEWEB)

    Bill Stanley; Sandra Brown; Zoe Kant; Patrick Gonzalez

    2009-01-07

    The Nature Conservancy participated in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project was 'Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration'. The objectives of the project were to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects, providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Final Technical Report discusses the results of the six tasks that The Nature Conservancy undertook to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between July 1st 2001 and July 10th 2008. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. The project occurred in two phases. The first was a focused exploration of specific carbon measurement and monitoring methodologies and pre-selected carbon sequestration opportunities. The second was a more systematic and comprehensive approach to compare various competing measurement and monitoring methodologies, and assessment of a variety of carbon sequestration opportunities in order to find those that are the lowest cost with the greatest combined carbon and other

  1. A quantitative analysis of the cost-effectiveness of project types in the CDM pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gavin A.

    2008-09-15

    The flexibility of the CDM is intended to reduce the cost of compliance for Annex 1 countries and contribute to cost-effective reductions. This paper provides a framework for defining cost-effective payments for CDM carbon reductions. The projects in the CDM pipeline are categorised into project types. The data provided in the Project Design Documents is quantitatively assessed to calculate the median cost and range of costs for producing a CER from the project categories. These are measured against the range of prices in the market in order to estimate the level of cost-effectiveness. Global warming potential and size of the project were shown to be key factors in the cost of producing a CER. The results show that although prices for CERs are difficult to define in the primary CER market, many of the project categories generated CERs at a cost well below the lowest market price. The difference in these two values is defined as a loss in cost-effectiveness. The CDM is shown to be successful at developing the 'lowest hanging fruit' but the mechanism could be improved to fulfil the goal of cost-effectiveness by linking the price per CER to the cost of generating a CER. (au)

  2. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  3. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  4. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  5. Sharing the cost of risky projects

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moulin, Hervé

    2018-01-01

    Users share the cost of unreliable non-rival projects (items). For instance, industry partners pay today for R&D that may or may not deliver a cure to some viruses, agents pay for the edges of a network that will cover their connectivity needs, but the edges may fail, etc. Each user has a binary...

  6. Projected costs of electricity generation

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-01-01

    This paper describes the outcomes of a study on the projected costs of generating electricity. It presents the latest data available on electricity generating costs for a wide variety of fuels and technologies, including coal, gas, nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal. The study reaches 2 key conclusions. First, at a 5% real interest rate, nuclear energy is the most competitive solution for base-load electricity generation followed by coal-fired plants without carbon capture and natural gas-fired combined plants. It should be noted that coal with carbon capture has not reached a commercial phase. Second, at a 10% interest rate, nuclear remains the most competitive in Asia and North America but in Europe, coal without carbon capture equipment, followed by coal with carbon capture equipment, and gas-fired combined cycle turbines are overall more competitive than nuclear energy. The results highlight the paramount importance of interest rates (this dependence is a direct consequence of the nuclear energy's high capital costs) and of the carbon price. For instance if we assume a 10% interest rate and a cost of 50 dollar per tonne of CO 2 , nuclear energy would become competitive against both coal and gas. (A.C.)

  7. Project SERAPHIM Report.

    Science.gov (United States)

    Moore, John W.

    1983-01-01

    Lists and briefly describes computer programs recently added to those currently available from Project SERAPHIM. Program name, subject, hardware, author, supplier, and cost are provided in separate listings for Apple, PET, TRS-80 I or III, IBM, VIC-20, TERAK, and PDP-11 microcomputers. Includes corrections for two current Apple programs. (JN)

  8. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  9. GAO report and EDF cost revisions reignite debate on Hinkley Point C

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, The Independent Global Nuclear News Agency, Brussels (Belgium)

    2017-10-15

    The announcement by French state-controlled utility EDF that it has added pound 1.5 bn (Euro 1.7 bn, $ 1.9 bn) to its estimated costs for two new reactors at Hinkley Point C, has led to questions about whether the government should rethink the project, with some politicians calling for it to be abandoned. EDF's announcement came less than two weeks after a report from the Government Accountability Office (GAO) said the government's deal for the two EPR units, now estimated to be costing pound 19.6 bn (Euro 22.3 bn, $ 25.5 bn), has locked consumers into a risky and expensive project with uncertain strategic and economic benefits. The UK's Energy Technologies Institute (ETI), in a report prepared before the EDF announcement, had already said the requirement to improve the predictability and affordability of new nuclear power plants has never been stronger.

  10. GAO report and EDF cost revisions reignite debate on Hinkley Point C

    International Nuclear Information System (INIS)

    Dalton, David

    2017-01-01

    The announcement by French state-controlled utility EDF that it has added pound 1.5 bn (Euro 1.7 bn, $ 1.9 bn) to its estimated costs for two new reactors at Hinkley Point C, has led to questions about whether the government should rethink the project, with some politicians calling for it to be abandoned. EDF's announcement came less than two weeks after a report from the Government Accountability Office (GAO) said the government's deal for the two EPR units, now estimated to be costing pound 19.6 bn (Euro 22.3 bn, $ 25.5 bn), has locked consumers into a risky and expensive project with uncertain strategic and economic benefits. The UK's Energy Technologies Institute (ETI), in a report prepared before the EDF announcement, had already said the requirement to improve the predictability and affordability of new nuclear power plants has never been stronger.

  11. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  12. Analysis of the production and transaction costs of forest carbon offset projects in the USA.

    Science.gov (United States)

    Galik, Christopher S; Cooley, David M; Baker, Justin S

    2012-12-15

    Forest carbon offset project implementation costs, comprised of both production and transaction costs, could present an important barrier to private landowner participation in carbon offset markets. These costs likewise represent a largely undocumented component of forest carbon offset potential. Using a custom spreadsheet model and accounting tool, this study examines the implementation costs of different forest offset project types operating in different forest types under different accounting and sampling methodologies. Sensitivity results are summarized concisely through response surface regression analysis to illustrate the relative effect of project-specific variables on total implementation costs. Results suggest that transaction costs may represent a relatively small percentage of total project implementation costs - generally less than 25% of the total. Results also show that carbon accounting methods, specifically the method used to establish project baseline, may be among the most important factors in driving implementation costs on a per-ton-of-carbon-sequestered basis, dramatically increasing variability in both transaction and production costs. This suggests that accounting could be a large driver in the financial viability of forest offset projects, with transaction costs likely being of largest concern to those projects at the margin. Copyright © 2012 Elsevier Ltd. All rights reserved.

  13. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  14. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  15. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  16. The cost and performance of utility commercial lighting programs. A report from the Database on Energy Efficiency Programs (DEEP) project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, J.; Vine, E.; Shown, L.; Sonnenblick, R.; Payne, C. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.

    1994-05-01

    The objective of the Database on Energy Efficiency Programs (DEEP) is to document the measured cost and performance of utility-sponsored, energy-efficiency, demand-side management (DSM) programs. Consistent documentation of DSM programs is a challenging goal because of problems with data consistency, evaluation methodologies, and data reporting formats that continue to limit the usefulness and comparability of individual program results. This first DEEP report investigates the results of 20 recent commercial lighting DSM programs. The report, unlike previous reports of its kind, compares the DSM definitions and methodologies that each utility uses to compute costs and energy savings and then makes adjustments to standardize reported program results. All 20 programs were judged cost-effective when compared to avoided costs in their local areas. At an average cost of 3.9{cents}/kWh, however, utility-sponsored energy efficiency programs are not ``too cheap to meter.`` While it is generally agreed upon that utilities must take active measures to minimize the costs and rate impacts of DSM programs, the authors believe that these activities will be facilitated by industry adoption of standard definitions and reporting formats, so that the best program designs can be readily identified and adopted.

  17. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  18. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  19. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  20. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  1. OPTIMIZATION OF TIMES AND COSTS OF PROJECT OF HORIZONTAL LAMINATOR PRODUCTION USING PERT/CPM TECHNICAL

    Directory of Open Access Journals (Sweden)

    Fernando Henrique Lermen

    2016-09-01

    Full Text Available The PERT/CPM is a technique widely used in both the scheduling and in the project feasibility in terms of cost control and time.  In order to optimize time and costs involved in production, the work presented here aims to apply the PERT/CPM technique in the production project of the Horizontal Laminator, a machine used to cut polyurethane foam blocks in the mattresses industries. For the application of PERT/CPM technique in the project of Horizontal Laminator production were identified the activities that compose the project, the dependence between them, the normal and accelerated durations and the normal and accelerated costs. In this study, deterministic estimates for the duration of the activities were considered. The results show that the project can be completed in 520 hours at a total cost of R$7,042.50, when all activities are performed in their normal durations.  When all the activities that compose the critical path are accelerated, the project can be completed in 333.3 hours at a total cost of R$9,263.01. If the activities slacks have been exploited, it can obtain a final total cost of R$6,157.8, without changing the new duration of the project. It is noteworthy that the final total cost of the project if the slacks are used, will be lower than the initial cost. Regarding the initial cost of the project, after the application of the PERT/CPM technique, it presents a decrease of 12.56% of the total project cost.

  2. IEA Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy; Work Package 1 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Schwabe, P.; Lensink, S.; Hand, M.

    2011-03-01

    The lifetime cost of wind energy is comprised of a number of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is critical in estimating a wind plant's cost of energy. Some of these cost streams will vary over the life of a given project. From the outset of project development, investors in wind energy have relatively certain knowledge of the plant's lifetime cost of wind energy. This is because a wind energy project's installed costs and mean wind speed are known early on, and wind generation generally has low variable operation and maintenance costs, zero fuel cost, and no carbon emissions cost. Despite these inherent characteristics, there are wide variations in the cost of wind energy internationally, which is the focus of this report. Using a multinational case-study approach, this work seeks to understand the sources of wind energy cost differences among seven countries under International Energy Agency (IEA) Wind Task 26 - Cost of Wind Energy. The participating countries in this study include Denmark, Germany, the Netherlands, Spain, Sweden, Switzerland, and the United States. Due to data availability, onshore wind energy is the primary focus of this study, though a small sample of reported offshore cost data is also included.

  3. Technical Progress Report on Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration

    Energy Technology Data Exchange (ETDEWEB)

    Bill Stanley; Patrick Gonzalez; Sandra Brown; Jenny Henman; Ben Poulter; Sarah Woodhouse Murdock; Neil Sampson; Tim Pearson; Sarah Walker; Zoe Kant; Miguel Calmon; Gilberto Tiepolo

    2006-06-30

    The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects, providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st and July 30th 2006. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. Work is being carried out in Brazil, Belize, Chile, Peru and the USA.

  4. 13 CFR 120.882 - Eligible Project costs for 504 loans.

    Science.gov (United States)

    2010-01-01

    ... financing including points, fees and interest. (e) If the project involves expansion of a small business... expansion of a small business concern” includes any project that involves the acquisition, construction or... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Eligible Project costs for 504...

  5. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  6. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  7. Project-Based Emissions Trading. The Impact of Institutional Arrangements on Cost-Effectiveness

    International Nuclear Information System (INIS)

    Woerdman, E.; Van der Gaast, W.

    2001-01-01

    In this paper we demonstrate that the institutional arrangement (or: design) of Joint Implementation (JI) and the Clean Development Mechanism (CDM) has a decisive impact on their cost-effectiveness. We illustrate our arguments by statistically analyzing the costs from 94 Activities Implemented Jointly (AIJ) pilot phase projects as well as by adjusting these data on the basis of simple mathematical formulas. These calculations explicitly take into account the institutional differences between JI (sinks, no banking) and the CDM (banking, no sinks) under the Kyoto Protocol and also show the possible effects on credit costs of alternative design options. However, our numerical illustrations should be viewed with caution, because AIJ is only to a limited extent representative of potential future JI and CDM projects and because credit costs are not credit prices. Some of the main figures found in this study are: an average cost figure per unit of emission reduction for AIJ projects of 46 dollar per ton of carbon dioxide equivalent ($/Mg CO 2 -eq), an average potential JI credit cost figure which is lowered to 37 $/Mg CO 2 -eq by introducing banking and an average of 6 $/Mg CO 2 -eq per credit for potential low-cost CDM projects which includes sinks. However, at CoP6 in November 2000 in The Hague (The Netherlands), the Parties to the Framework Convention on Climate Change (FCCC) did not (yet) reach consensus on the institutional details of the project-based mechanisms, such as the possible arrangement of early JI action or the inclusion of sinks under the CDM. 55 refs

  8. nuSTORM Costing document

    Energy Technology Data Exchange (ETDEWEB)

    Bross, Alan D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-10-01

    Detailed costing of the nuSTORM conventional facilities has been done by the Fermilab Facilities Engineering Services Section (FESS) and is reported on in the nuSTORM Project Definition Report (PDR) 6-13-1. Estimates for outfitting the primary proton beam line, the target station, the pion capture/transport line and decay ring are based on either experience from existing Fermilab infrastructure (NuMI) or is based on the detailed costing exercises for DOE CD-1 approval for future experiments (mu2e and LBNE). The detector costing utilized the Euronu costing for the Neutrino Factory Magnetized Iron Neutrino Detector (MIND), extrapolations from MINOS as-built costs and from recent vendor quotes. Costs included all manpower and are fully burdened (FY2013 dollars). The costs are not escalated, however, beyond the 5-year project timeline, since a project start for nuSTORM is unknown. Escalation can be estimated from various models (see Figure 1). LBNE has used the Jacob’s model to determine their cost escalation.

  9. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  10. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects

    Science.gov (United States)

    1997-02-01

    The General Accounting Office (GAO) was requested to assess the effectiveness of the Federal Highway Administration's (FHWA's) oversight of the costs of large-dollar highway and bridge projects (those with a total estimated cost of over $100 million)...

  11. Unicycle Project Report

    OpenAIRE

    Thomson, S

    2010-01-01

    The Unicycle project implemented an institutional Open Educational Resource repository with a view to ensuring sustainability in approach by embedding OER as an Assessment, Learning and Teaching strategy. This is the final submitted report for the project.

  12. Final Report - Stationary and Emerging Market Fuel Cell System Cost Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Contini, Vince [Battelle Memorial Inst., Columbus, OH (United States); Heinrichs, Mike [Battelle Memorial Inst., Columbus, OH (United States); George, Paul [Battelle Memorial Inst., Columbus, OH (United States); Eubanks, Fritz [Battelle Memorial Inst., Columbus, OH (United States); Jansen, Mike [Battelle Memorial Inst., Columbus, OH (United States); Valluri, Manoj [Battelle Memorial Inst., Columbus, OH (United States); Mansouri, Mahan [Battelle Memorial Inst., Columbus, OH (United States); Swickrath, Mike [Battelle Memorial Inst., Columbus, OH (United States)

    2017-04-30

    The U.S. Department of Energy (DOE) is focused on providing a portfolio of technology solutions to meet energy security challenges of the future. Fuel cells are a part of this portfolio of technology offerings. To help meet these challenges and supplement the understanding of the current research, Battelle has executed a five-year program that evaluated the total system costs and total ownership costs of two technologies: (1) an ~80 °C polymer electrolyte membrane fuel cell (PEMFC) technology and (2) a solid oxide fuel cell (SOFC) technology, operating with hydrogen or reformate for different applications. Previous research conducted by Battelle, and more recently by other research institutes, suggests that fuel cells can offer customers significant fuel and emission savings along with other benefits compared to incumbent alternatives. For this project, Battelle has applied a proven cost assessment approach to assist the DOE Fuel Cell Technologies Program in making decisions regarding research and development, scale-up, and deployment of fuel cell technology. The cost studies and subsequent reports provide accurate projections of current system costs and the cost impact of state-of-the-art technologies in manufacturing, increases in production volume, and changes to system design on system cost and life cycle cost for several near-term and emerging fuel cell markets. The studies also provide information on types of manufacturing processes that must be developed to commercialize fuel cells and also provide insights into the optimization needed for use of off-the-shelf components in fuel cell systems. Battelle’s analysis is intended to help DOE prioritize investments in research and development of components to reduce the costs of fuel cell systems while considering systems optimization.

  13. Benchmarking for Cost Improvement. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy`s (DOE) Office of Environmental Restoration and Waste Management (EM) conducted the Benchmarking for Cost Improvement initiative with three objectives: Pilot test benchmarking as an EM cost improvement tool; identify areas for cost improvement and recommend actions to address these areas; provide a framework for future cost improvement. The benchmarking initiative featured the use of four principal methods (program classification, nationwide cost improvement survey, paired cost comparison and component benchmarking). Interested parties contributed during both the design and execution phases. The benchmarking initiative was conducted on an accelerated basis. Of necessity, it considered only a limited set of data that may not be fully representative of the diverse and complex conditions found at the many DOE installations. The initiative generated preliminary data about cost differences and it found a high degree of convergence on several issues. Based on this convergence, the report recommends cost improvement strategies and actions. This report describes the steps taken as part of the benchmarking initiative and discusses the findings and recommended actions for achieving cost improvement. The results and summary recommendations, reported below, are organized by the study objectives.

  14. Projection report 2015 according to the EU regulation no. 525/2013/EU

    International Nuclear Information System (INIS)

    2016-01-01

    For the German projection report 2015 a research consort has elaborated a with-measures-scenario for the development of greenhouse gas emission in Germany for the period 2005 to 2035. The following issues are covered: demographic and economic data, projection of the primary energy cost development; prices for greenhouse emission permissions (traffic, private households, industry); overall measures, measured within individual sections; quantification of the effect of climate protection measures and instruments including methodology and sensitivity analyses (traffic, buildings, private households, commerce, industry, energy production, agriculture, waste industry), projection results.

  15. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    Science.gov (United States)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  16. A framework for cost-aware process management: cost reporting and cost prediction

    NARCIS (Netherlands)

    Wynn, M.T.; Low, W.Z.; Hofstede, ter A.H.M.; Nauta, W.E.

    2014-01-01

    Organisations are constantly seeking efficiency gains for their business processes in terms of time and cost. Management accounting enables detailed cost reporting of business operations for decision making purposes, although significant effort is required to gather accurate operational data.

  17. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  18. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  19. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  20. Assessing the Implementation and Cost of High Quality Early Care and Education: A Review of the Literature. OPRE Report 2016-31

    Science.gov (United States)

    Caronongan, Pia; Kirby, Gretchen; Boller, Kimberly; Modlin, Emily; Lyskawa, Julia

    2016-01-01

    This report summarizes the findings of a literature review conducted as part of the Assessing the Implementation and Cost of High-Quality Early Care and Education (ECE-ICHQ) project. The project's goal is to create a technically sound and feasible instrument that will provide consistent, systematic measures of the implementation and costs of…

  1. Report on the Savannah River Site aluminum-based spent nuclear fuel alternatives cost study

    International Nuclear Information System (INIS)

    1998-12-01

    Initial estimates of costs for the interim management and disposal of aluminum-based spent nuclear fuel (SNF) were developed during preparation of the Environmental Impact Statement (EIS) on the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel. The Task Team evaluated multiple alternatives, assessing programmatic, technical, and schedule risks, and generated life-cycle cost projections for each alternative. The eight technology alternatives evaluated were: direct co-disposal; melt and dilute; reprocessing; press and dilute; glass material oxidation dissolution system (GMODS); electrometallurgical treatment; dissolve and vitrify; and plasma arc. In followup to the Business Plan that was developed to look at SNF dry storage, WSRC prepared an addendum to the cost study. This addendum estimated the costs for the modification and use of an existing (105L) reactor facility versus a greenfield approach for new facilities (for the Direct Co-Disposal and Melt and Dilute alternatives). WSRC assessed the impacts of a delay in reprocessing due to the potential reservation of H-Canyon for other missions (i.e., down blending HEU for commercial use or the conversion of plutonium to either MOX fuel or an immobilized repository disposal form). This report presents the relevant results from these WSRC cost studies, consistent with the most recent project policy, technology implementation, canyon utilization, and inventory assumptions. As this is a summary report, detailed information on the technical alternatives or the cost assumptions raised in each of the above-mentioned cost studies is not provided. A comparison table that briefly describes the bases used for the WSRC analyses is included as Appendix A

  2. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  3. A low-cost and portable realization on fringe projection three-dimensional measurement

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  4. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  5. Waste Management Facilities Cost Information Report

    Energy Technology Data Exchange (ETDEWEB)

    Feizollahi, F.; Shropshire, D.

    1992-10-01

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

  6. Waste Management Facilities Cost Information Report

    International Nuclear Information System (INIS)

    Feizollahi, F.; Shropshire, D.

    1992-10-01

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options

  7. WP1 – Final project report

    NARCIS (Netherlands)

    Drachsler, Hendrik; Scheffel, Maren; Orrego, Carola; Stieger, Lina; Hartkopf, Kathleen; Henn, Patrick; Hynes, Helen; Przibilla, Monika; Geiger, Uschi; Schroeder, Hanna; Sopka, Sasa

    2015-01-01

    This report contains the complete project reporting of the PATIENT project from October 2012 until end of March 2015. It provides a summary of all project activities and achievements that are based on the previous WP deliverables such as the project progress reports from WP1 (D1.01) and the quality

  8. Externalities of fuel cycles 'ExternE' project. Summary report

    International Nuclear Information System (INIS)

    Holland, M.; Berry, J.

    1994-01-01

    energy use in the transport and domestic sectors and a number of non-environmental externalities. Phase 3 of the project will be undertaken within the European Commission's 4th Framework Programme (1995-1998) and will concentrate on the application of the accounting framework in support of policy issues and decision making. A major result of this work is the methodology which has been developed. This is a significant advance on earlier studies of the external costs of energy. It provides a transparent basis on which different impacts, technologies and locations may be compared. It is suitable for evaluation of the health and environmental damages due to increments in electricity production, with or without monetary valuation of the impacts. This report reviews this methodology and presents the major results obtained in its application to seven important fuel cycles, namely the coal, lignite, oil, gas, nuclear, hydro and wind fuel cycles. Chapter 2 reviews the methodology developed for the quantification of impacts and discusses the associated issues. Chapter 3 discusses the methodological issues associated with the economic valuation of impacts. Chapters 4 and 5 report in detail on the assessment of the coal and nuclear fuel cycles. Chapter 6 summarises the progress that has been made to date on the ExternE Project and presents a comparison of the results obtained for the four fossil fuel cycles together with results from the nuclear and renewable fuel cycles. This project is at the forefront of work in this area. It has drawn together an extensive multidisciplinary team of environmental scientists, energy technologists, health and ecology experts, atmospheric modellers, economists and computer analysts. The results obtained are based on thorough review of scientific and economic studies. This does not mean that exact values have been established for external costs. Indeed, one of our most important conclusions is that the uncertainties are large. Previous analyses

  9. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  10. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  11. 30 CFR 203.89 - What is in a cost report?

    Science.gov (United States)

    2010-07-01

    ... based on historical costs, engineering estimates, or analogous projects. These costs cover: (1... evaluations). (d) Transportation costs, based on historical costs, engineering estimates, or analogous... lines; and (3) Gas plant processing for natural gas liquids. (e) Abandonment costs, based on historical...

  12. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    International Nuclear Information System (INIS)

    Tomes, John J; Finlayson, Chris E

    2016-01-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values. (paper)

  13. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    Science.gov (United States)

    Tomes, John J.; Finlayson, Chris E.

    2016-09-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values.

  14. Final Report for NIREC Renewable Energy Research & Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Borland, Walt [Nevada Institute for Renewable Energy Commercialization (NIREC), Las Vegas, NV (United States)

    2017-05-02

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption of renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.

  15. The LiveWire Project final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, C.D.; Nelson, T.T. [Enova Technology, San Diego, CA (United States); Kelly, J.C.; Dominguez, H.A. [Paragon Consulting Services, La Verne, CA (United States)

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  16. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  17. Revised management plan, milestone plan, cost plan, and manpower plan. Sixth and seventh monthly status reports, October 1-November 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1978-01-01

    The following are included: project background and discussion, technical progress reports for all subtasks, contract management summary report, milestone schedule and status report, milestone log, cost plans, cost management reports, manpower plans, and manpower management reports. The following appendices are included: selection of heat pumps simulation locations, economic computations, fuel costs, system studies, recommended methodology for calculating residential load models, potential performance of heat pumps, data required from cooling contractors, cooling locations, thermal outputs: cooling, recommended inputs for the 25 ton advanced cooling simulation study, meteorological data, and contract modification. (MHR)

  18. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  19. Carbon Accounting and Cost Estimation in Forestry Projects Using CO2Fix V.3

    International Nuclear Information System (INIS)

    Groen, T.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is applied to four cases: (1) Joint implementation afforestation project in Romania, (2) Forest management project in Central Europe, (3) Reduced impact logging possibly under the Clean Development Mechanism (CDM) in the future, and (4) Afforestation with native species under the Clean Development Mechanism. The results show the wide applicability of CO2FIX, from degrading grasslands as baseline cases to multiple cohort forest ecosystems. Also the results show that Forest Management in the European case can generate considerable amounts of carbon emission reductions. Further, the results show that although reduced impact logging is not yet an allowed option under the Clean Development Mechanism, it shows promising results in that it is (1) very cost effective, (2) seems to be able to generate intermediate amounts of credits and (3) seems to us as a project type that is not prone to leakage issues. These results are yet another indication to seriously consider reduced impact logging as an eligible measure under the CDM

  20. Projected costs of generating electricity - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This joint report by the International Energy Agency (IEA) and the OECD Nuclear Energy Agency (NEA) is the seventh in a series of studies on electricity generating costs. It presents the latest data available for a wide variety of fuels and technologies, including coal and gas (with and without carbon capture), nuclear, hydro, onshore and offshore wind, biomass, solar, wave and tidal as well as combined heat and power (CHP). It provides levelised costs of electricity (LCOE) per MWh for almost 200 plants, based on data covering 21 countries (including four major non-OECD countries), and several industrial companies and organisations. For the first time, the report contains an extensive sensitivity analysis of the impact of variations in key parameters such as discount rates, fuel prices and carbon costs on LCOE. Additional issues affecting power generation choices are also examined. The study shows that the cost competitiveness of electricity generating technologies depends on a number of factors which may vary nationally and regionally. Readers will find full details and analyses, supported by over 130 figures and tables, in this report which is expected to constitute a valuable tool for decision makers and researchers concerned with energy policies and climate change

  1. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  2. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    International Nuclear Information System (INIS)

    1995-01-01

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE's UMTRA Project is the world's largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation

  3. Low Cost Solar Array Project. Feasibility of the silane process for producing semiconductor-grade silicon. Final report, October 1975-March 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The commercial production of low-cost semiconductor-grade silicon is an essential requirement of the JPL/DOE (Department of Energy) Low-Cost Solar Array (LSA) Project. A 1000-metric-ton-per-year commercial facility using the Union Carbide Silane Process will produce molten silicon for an estimated price of $7.56/kg (1975 dollars, private financing), meeting the DOE goal of less than $10/kg. Conclusions and technology status are reported for both contract phases, which had the following objectives: (1) establish the feasibility of Union Carbide's Silane Process for commercial application, and (2) develop an integrated process design for an Experimental Process System Development Unit (EPSDU) and a commercial facility, and estimate the corresponding commercial plant economic performance. To assemble the facility design, the following work was performed: (a) collection of Union Carbide's applicable background technology; (b) design, assembly, and operation of a small integrated silane-producing Process Development Unit (PDU); (c) analysis, testing, and comparison of two high-temperature methods for converting pure silane to silicon metal; and (d) determination of chemical reaction equilibria and kinetics, and vapor-liquid equilibria for chlorosilanes.

  4. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  5. Cost and sensitivity analysis for uranium in situ leach mining. Open file report Oct 79-Mar 81

    International Nuclear Information System (INIS)

    Toth, G.W.; Annett, J.R.

    1981-03-01

    This report presents the results of an assessment of uranium in situ leach mining costs through the application of process engineering and discounted cash flow analysis procedures. A computerized costing technique was developed to facilitate rapid cost analyses. Applications of the cost model will generate mine life capital and operating costs as well as solve for economic production cost per pound U 3 O 8 . Conversely, rate of return may be determined subject to a known selling price. The data bases of the cost model were designed to reflect variations in Texas versus Wyoming site applications. The results of applying the model under numerous ore deposit, operating, well field, and extraction plant conditions for Texas and Wyoming are summarized in the report. Sensitivity analysis of changes in key project parameters have also been tested and are included

  6. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  7. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  8. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  9. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  10. Challenges in Delivering Green Building Projects: Unearthing the Transaction Costs (TCs

    Directory of Open Access Journals (Sweden)

    Queena K. Qian

    2015-03-01

    Full Text Available Delivering green building (GB projects involve some activities that are atypical in comparison with conventional buildings. Such new activities are characterized by uncertainty, and they incur hidden costs that have not been expected nor are they readily appreciated among the stakeholders. This paper develops a typology and chronology to examine the new activities that are associated with transaction costs (TCs in the real estate development process (REDP of green building. Through in-depth interviews with representatives from the major developers in Hong Kong who have experiences in GB practice, this study aims to unearth TCs involved at the critical stages of the REDP. Apart from reconfirming the early project planning stage as the most critical in the consideration of TCs, the study results also identified “extra legal liability risk of the GB product” as the major concern for any GB developer in Hong Kong. The key additional activities that bring significant TCs in developing GB are identified and compared to their traditional counterparts. In turn, project managers not only have to pursue overall cost management whilst winning more business, but they also have to pay particular attention to sustainability in order to minimize hidden societal costs. The study also provides a reference for governments and professionals that will aid in forming policy as well as advance the practice of the GB market by optimizing the societal costs.

  11. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  12. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  13. Monitoring and evaluation of Blyth Offshore Wind Farm. Projected operation and maintenance costs of UK offshore wind farms based on the experience at Blyth

    Energy Technology Data Exchange (ETDEWEB)

    Greig, E.

    2004-07-01

    This is the fifth of seven reports in this series on specific aspects of the monitoring and evaluation of the Blyth offshore wind farm project. The report assesses the operation and maintenance (O and M) costs for the wind farm in its first full year of operation, and extrapolates these costs to give indicative costs for larger projects. It identifies both planned regular costs and unplanned site maintenance costs; some costs can be attributed to 'troubleshooting' during installation and would not be expected in future years. The Blyth wind farm, the first in the UK, consists of two 2 MW wind turbines installed approximately 1 km from the coast in water about 6 m deep at low tide. The site is exposed to the full impact of the North Sea weather, breaking waves and a significant tidal range (about 5 m). Location, boat availability, weather and insurance are identified as the key factors affecting O and M costs for future offshore wind farms in the UK.

  14. Health Clinic Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Healthcare Cost Report Information System (HCRIS) Dataset - Independent Rural Health Clinic and Freestanding Federally Qualified Health Center (HCLINIC).This data...

  15. Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, R.R.

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.

  16. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  17. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  18. Fermilab D-0 Experimental Facility: Energy conservation report and mechanical systems design optimization and cost analysis study

    International Nuclear Information System (INIS)

    Krstulovich, S.F.

    1987-01-01

    This report is developed as part of the Fermilab D-0 Experimental Facility Project Title II Design Documentation Update. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis

  19. Supercompaction/grouting demonstration project: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of this supercompaction demonstration project was to allow Martin Marietta Energy Systems, Inc. (The Company), to obtain cost analysis and performance information on volume reduction and waste encapsulation of solid, low-level contaminated waste (SLW). Ultimately, this information will be used to help define a waste disposal process for SLW that is acceptable to regulatory agencies and the US Department of Energy, Oak Ridge Operations (DOE/ORO). The technical objectives of the demonstration project were: (1) to obtain detailed performance data on each of the compacted barrels; (2) evaluate operating performance problems that may have occurred; (3) describe in detail the compaction and encapsulation process; and (4) to obtain operating cost data for the performance of this demonstration

  20. Quarterly report on program cost and schedule: Third quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian radioactive waste management program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes performance data through June 1988. In December 1987, Congress passed the Nuclear Waste Policy Amendments Act of 1987 which changed the near-term activities of the program. Specifically, this Act required that the tuff site in Nevada be characterized for the first repository and that site-specific activities at the other two first repository sites (the salt site in Texas and the basalt site in Washington) be terminated within 90 days of enactment. The Act requires the phase-out of all second repository activities designed to evaluate the suitability of crystalline rock as a potential hoist rock for a repository. The new legislation impacts the contents of this report by focusing the first repository program on the activities of the tuff project and phasing-out the activities for the salt, basalt and second repository projects

  1. EBT-P project status report

    International Nuclear Information System (INIS)

    1983-11-01

    This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project

  2. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  3. NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs

    Institute of Scientific and Technical Information of China (English)

    Franco-Sepulveda Giovanni; Campuzano Carlos; Pineda Cindy

    2017-01-01

    This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

  4. Weighing the Costs and Benefits of Renewables Portfolio Standards:A Comparative Analysis of State-Level Policy Impact Projections

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Cliff; Wiser, Ryan; Bolinger, Mark

    2007-01-16

    State renewables portfolio standards (RPS) have emerged as one of the most important policy drivers of renewable energy capacity expansion in the U.S. Collectively, these policies now apply to roughly 40% of U.S. electricity load, and may have substantial impacts on electricity markets, ratepayers, and local economies. As RPS policies have been proposed or adopted in an increasing number of states, a growing number of studies have attempted to quantify the potential impacts of these policies, focusing primarily on projecting cost impacts, but sometimes also estimating macroeconomic and environmental effects. This report synthesizes and analyzes the results and methodologies of 28 distinct state or utility-level RPS cost impact analyses completed since 1998. Together, these studies model proposed or adopted RPS policies in 18 different states. We highlight the key findings of these studies on the costs and benefits of RPS policies, examine the sensitivity of projected costs to model assumptions, assess the attributes of different modeling approaches, and suggest possible areas of improvement for future RPS analysis.

  5. An analysis of decommissioning costs

    International Nuclear Information System (INIS)

    Teunckens, L.; Loeschhorn, U.; Yanagihara, S.; Wren, G.; Menon, S.

    1992-01-01

    Within the OECD/NEA Cooperative Programme on Decommissioning a Task Group was set up early in 1989 to identify the reasons for the large variations in decommissioning cost estimates. The Task Group gathered cost data from 12 of the 14 projects in the Programme to form the basis of their analysis. They included reactors being decommissioned to various stages as well as fuel cycle facilities. The projects were divided into groups of projects with similar characteristics ('models') to facilitate the analysis of the cost distribution in each group of projects and the cost data was progressively refined by a dialogue between the Task Group and the project managers. A comparative analysis was then performed and project specific discrepancies were identified. The Task Group's report is summarized on the results of the comparative analysis as well as the lessons learnt by the Task Group in the acquisition and analysis of cost data from international decommissioning projects. (author) 5 tabs

  6. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  7. NREL Energy Storage Projects. FY2014 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, Ahmad [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ban, Chunmei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Burton, Evan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gonder, Jeff [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Grad, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jun, Myungsoo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Keyser, Matt [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kim, Gi-Heon [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Neubauer, Jeremy [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Santhanagopalan, Shriram [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saxon, Aron [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Shi, Ying [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sprague, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tenent, Robert [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wood, Eric [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Yang, Chuanbo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Chao [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Han, Taeyoung [General Motors, Detroit, MI (United States); Hartridge, Steve [CD-adapco, Detroit, MI (United States); Shaffer, Christian E. [EC Power, Aurora, CO (United States)

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  8. Projected Costs of Generating Electricity - 2015 Edition. Executive Summary

    International Nuclear Information System (INIS)

    2015-01-01

    This joint report by the International Energy Agency (IEA) and the Nuclear Energy Agency (NEA) is the eighth in a series of studies on electricity generating costs. As policy makers work to ensure that the power supply is reliable, secure and affordable, while making it increasingly clean and sustainable in the context of the debate on climate change, it is becoming more crucial that they understand what determines the relative cost of electricity generation using fossil fuel, nuclear or renewable sources of energy. A wide range of fuels and technologies are presented in the report, including natural gas, coal, nuclear, hydro, solar, onshore and offshore wind, biomass and biogas, geothermal, and combined heat and power, drawing on a database from surveys of investment and operating costs that include a larger number of countries than previous editions. The analysis of more than 180 plants, based on data covering 22 countries, reveals several key trends, pointing, for example, to a significant decline in recent years in the cost of renewable generation. The report also reveals that nuclear energy costs remain in line with the cost of other base-load technologies, particularly in markets that value de-carbonisation. Overall, cost drivers of the different generating technologies remain both market-specific and technology-specific. Readers will find a wealth of details and analysis, supported by over 200 figures and tables, underlining this report's value as a tool for decision makers and researchers concerned with energy policies, climate change and the evolution of power sectors around the world. (authors)

  9. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  10. New Concepts in Fish Ladder Design, Part I of IV, Summary Report, 1982-1984 Final Project Report.

    Energy Technology Data Exchange (ETDEWEB)

    Orsborn, John F.

    1985-08-01

    The report looks at the most active periods of fishway research since 1938 as background for a project to apply fundamental fluid and bio-mechanics to fishway design, and develop more cost effective fish passage facilities with primary application to small scale hydropower facilities. Also discussed are new concepts in fishway design, an assessment of fishway development and design, and an analysis of barriers to upstream migration. (ACR)

  11. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  12. LBNL report of the vetting review of the GRETINA project

    International Nuclear Information System (INIS)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.

    2004-01-01

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas

  13. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  14. A Systematic Review of Cost-Effectiveness Studies Reporting Cost-per-DALY Averted.

    Directory of Open Access Journals (Sweden)

    Peter J Neumann

    Full Text Available Calculating the cost per disability-adjusted life years (DALYs averted associated with interventions is an increasing popular means of assessing the cost-effectiveness of strategies to improve population health. However, there has been no systematic attempt to characterize the literature and its evolution.We conducted a systematic review of cost-effectiveness studies reporting cost-per-DALY averted from 2000 through 2015. We developed the Global Health Cost-Effectiveness Analysis (GHCEA Registry, a repository of English-language cost-per-DALY averted studies indexed in PubMed. To identify candidate studies, we searched PubMed for articles with titles or abstracts containing the phrases "disability-adjusted" or "DALY". Two reviewers with training in health economics independently reviewed each article selected in our abstract review, gathering information using a standardized data collection form. We summarized descriptive characteristics on study methodology: e.g., intervention type, country of study, study funder, study perspective, along with methodological and reporting practices over two time periods: 2000-2009 and 2010-2015. We analyzed the types of costs included in analyses, the study quality on a scale from 1 (low to 7 (high, and examined the correlation between diseases researched and the burden of disease in different world regions.We identified 479 cost-per-DALY averted studies published from 2000 through 2015. Studies from Sub-Saharan Africa comprised the largest portion of published studies. The disease areas most commonly studied were communicable, maternal, neonatal, and nutritional disorders (67%, followed by non-communicable diseases (28%. A high proportion of studies evaluated primary prevention strategies (59%. Pharmaceutical interventions were commonly assessed (32% followed by immunizations (28%. Adherence to good practices for conducting and reporting cost-effectiveness analysis varied considerably. Studies mainly included

  15. Projected costs of nuclear and conventional base load electricity generation in some IAEA Member States

    International Nuclear Information System (INIS)

    1990-09-01

    The cost of nuclear and conventional electricity is one of the most important parameters for power system planning, and in particular for decisions on base load power projects. This study reviews the projected levelized electricity generation costs of the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained and evaluated for nuclear and fossil fuelled (mainly coal-fired) plants that could be commissioned in the mid- to late 1990s in 10 IAEA Member States. 27 refs, figs and tabs

  16. Risk information in support of cost estimates for the Baseline Environmental Management Report (BEMR). Section 1

    International Nuclear Information System (INIS)

    Gelston, G.M.; Jarvis, M.F.; Warren, B.R.; Von Berg, R.

    1995-06-01

    The Pacific Northwest Laboratory (PNL)(1) effort on the overall Baseline Environmental Management Report (BEMR) project consists of four installation-specific work components performed in succession. These components include (1) development of source terms, 92) collection of data and preparation of environmental settings reports, (3) calculation of unit risk factors, and (4) utilization of the unit risk factors in Automated Remedial Action Methodology (ARAM) for computation of target concentrations and cost estimates. This report documents work completed for the Nevada Test Site, Nevada, for components 2 and 3. The product of this phase of the BEMR project is the development of unit factors (i.e., unit transport factors, unit exposure factors, and unit risk factors). Thousands of these unit factors are gene rated and fill approximately one megabyte of computer information per installation. The final unit risk factors (URF) are transmitted electronically to BEMR-Cost task personnel as input to a computer program (ARAM). Abstracted files and exhibits of the URF information are included in this report. These visual formats are intended to provide a sample of the final task deliverable (the URF files) which can be easily read without a computer

  17. New vaccines against otitis media: projected benefits and cost-effectiveness.

    Science.gov (United States)

    O'Brien, Megan A; Prosser, Lisa A; Paradise, Jack L; Ray, G Thomas; Kulldorff, Martin; Kurs-Lasky, Marcia; Hinrichsen, Virginia L; Mehta, Jyotsna; Colborn, D Kathleen; Lieu, Tracy A

    2009-06-01

    New vaccines that offer protection against otitis media caused by nontypeable Haemophilus influenzae and by Moraxella catarrhalis are under development. However, the potential health benefits and economic effects of such candidate vaccines have not been systematically assessed. We created a computerized model to compare the projected benefits and costs of (1) the currently available 7-valent pneumococcal conjugate vaccine, (2) a candidate pneumococcal-nontypeable H influenzae vaccine that has been tested in Europe, (3) a hypothetical pneumococcal-nontypeable H influenzae-Moraxella vaccine, and (4) no vaccination. The clinical probabilities of acute otitis media and of otitis media with effusion were generated from multivariate analyses of data from 2 large health maintenance organizations and from the Pittsburgh Child Development/Otitis Media Study cohort. Other probabilities, costs, and quality-of-life values were derived from published and unpublished sources. The base-case analysis assumed vaccine dose costs of $65 for the 7-valent pneumococcal conjugate vaccine, $100 for the pneumococcal-nontypeable H influenzae vaccine, and $125 for the pneumococcal-nontypeable H influenzae-Moraxella vaccine. With no vaccination, we projected that 13.7 million episodes of acute otitis media would occur annually in US children aged 0 to 4 years, at an annual cost of $3.8 billion. The 7-valent pneumococcal conjugate vaccine was projected to prevent 878,000 acute otitis media episodes, or 6.4% of those that would occur with no vaccination; the corresponding value for the pneumococcal-nontypeable H influenzae vaccine was 3.7 million (27%) and for the pneumococcal-nontypeable H influenzae-Moraxella vaccine was 4.2 million (31%). Using the base-case vaccine costs, pneumococcal-nontypeable H influenzae vaccine use would result in net savings compared with nontypeable 7-valent pneumococcal conjugate use. Conversely, pneumococcal-nontypeable H influenzae-Moraxella vaccine use would not

  18. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  19. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  20. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  1. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  2. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  3. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Clark, F.R.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project

  4. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  5. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  6. Financial Reporting and Cost Analysis Manual for Day Care Centers, Head Start, and Other Programs.

    Science.gov (United States)

    Bedger, Jean E.; And Others

    This manual is designed to provide fundamental directions for systematic financial reporting and cost analysis for the administrators, accountants, bookkeepers, and staff of day care, Project Head Start, and other programs. The major aims of the manual are to induce day care directors to adopt uniform bookkeeping procedures and to analyze costs…

  7. Multi-objective optimization of discrete time-cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

    Science.gov (United States)

    Shahriari, Mohammadreza

    2016-06-01

    The time-cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate extra resources to short the finishing time of project and the project managers are intended to spend the lowest possible amount of money and achieve the maximum crashing time, as a result, both direct and indirect costs will be influenced in the project, and here, we are facing into the time value of money. It means that when we crash the starting activities in a project, the extra investment will be tied in until the end date of the project; however, when we crash the final activities, the extra investment will be tied in for a much shorter period. This study is presenting a two-objective mathematical model for balancing compressing the project time with activities delay to prepare a suitable tool for decision makers caught in available facilities and due to the time of projects. Also drawing the scheduling problem to real world conditions by considering nonlinear objective function and the time value of money are considered. The presented problem was solved using NSGA-II, and the effect of time compressing reports on the non-dominant set.

  8. Results from the OECD report on international projections of electricity generating costs

    International Nuclear Information System (INIS)

    Paffenbarger, J.A.; Bertel, E.

    1998-01-01

    The International Energy Agency and Nuclear Energy Agency of the OECD have periodically undertaken a joint study on electricity generating costs in OECD Member countries and selected non-Member countries. This paper presents key results from the 1998 update of this study. Experts from 19 countries drawn from electric utility companies and government provided data on capital costs, operating and maintenance costs, and fuel costs from which levelized electricity generating costs (US cents/kWh) for baseload power plants were estimated in each country using a common set of economic assumptions. Light water nuclear power plants, pulverized coal plants, and natural gas-fired combined cycle gas turbines were the principal options evaluated. five and 10% discount rates, 40-year operating lifetime, and 75% annual load factor were the base assumptions, with sensitivity analyses on operating lifetime and load factor. Fuel costs and fuel escalation were provided individually by country, with a sensitivity case to evaluate costs assuming no real fuel price escalation over plant lifetimes. Of the three principal fuel/technology options, none is predominantly the cheapest option for all economic assumptions. However, fossil-fueled options are generally estimated to be the least expensive option. The study confirms that gas-fired combined cycles have improved their economic performance in most countries in recent years and are strong competitors to nuclear and coal-fired plants. Eleven out of the 18 countries with two or more options show gas-fired plants to be the cheapest option at 10% discount rate. Coal remains a strong competitor to gas when lower discount rates are used. Nuclear is the least expensive at both 5 and 10% discount rate in only two countries. Generally, with gas prices above 5 US$/GJ, nuclear plants constructed at overnight capital costs below 1 650 $/kWe have the potential to be competitive only at lower discount rates

  9. Utility-Scale Solar 2015: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division

    2016-08-17

    The utility-scale solar sector—defined here to include any ground-mounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar power (“CSP”) project that is larger than 5 MWAC in capacity—has led the overall U.S. solar market in terms of installed capacity since 2012. It is expected to maintain its market-leading position for at least another five years, driven in part by December 2015’s three-year extension of the 30% federal investment tax credit (“ITC”) through 2019 (coupled with a favorable switch to a “start construction” rather than a “placed in service” eligibility requirement, and a gradual phase down of the credit to 10% by 2022). In fact, in 2016 alone, the utility-scale sector is projected to install more than twice as much new capacity as it ever has previously in a single year. This unprecedented boom makes it difficult, yet more important than ever, to stay abreast of the latest utility-scale market developments and trends. This report—the fourth edition in an ongoing annual series—is intended to help meet this need, by providing in-depth, annually updated, data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes not just installed project costs or prices—i.e., the traditional realm of most solar economic analyses—but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects throughout the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

  10. Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-09-01

    Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MWAC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the next few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.

  11. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  12. Annual report on reactor safety research projects. Reporting period 2011. Progress report

    International Nuclear Information System (INIS)

    2011-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  13. Annual report on reactor safety research projects. Reporting period 2014. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. lt has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  14. Annual report on reactor safety research projects. Reporting period 2013. Progress report

    International Nuclear Information System (INIS)

    2013-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  15. Annual report on reactor safety research projects. Reporting period 2015. Progress report

    International Nuclear Information System (INIS)

    2015-01-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft tor Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are ·' prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. it has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  16. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  17. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  18. Costing Future Complex and Novel Projects

    Science.gov (United States)

    2016-04-30

    Defence Science and Technology Laboratory (DSTL) is reported. The work involves pioneering data collection, analysis, and tool development to support... philosophy of the work and future prospects for its wider application. Summary The United Kingdom National Audit Office Major Projects Report 2014 states...the work will be in tackling variety in the data collected, one of the “3 Vs ” of Big Data. The outline programme is shown in Figure 2. Programme

  19. Supporting data and calculations for the NNWSI [Nevada Nuclear Waste Storage Investigations] project information management system concepts evaluation report

    International Nuclear Information System (INIS)

    1986-12-01

    This report presents the supporting data and calculations that provided the basis for the NNWSI Project Information Management System Concepts Evaluation Report. Project documentation estimates for numbers of documents and pages are presented for all nine Project participants. These estimates cover the time period from 1980 to 1990. In addition, the report presents a calculational method for estimating document and page volumes beyond the year 1990. Electronic character code and bit-mapped image storage requirements associated with the page volumes are also shown and the calculational method described. Six conceptual system approaches capable of satisfying NNWSI Project requirements are defined and described. These approaches include: fully centralized microfilm system based on computer-assisted retrieval (CAR) (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical disk system based on electronic image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). All assumptions associated with these approaches are given. Data sheets in an appendix describe the capital equipment and labor components that were used as the basis of the cost evaluation. Definitions of two cost scenarios cover: (1) processing of all documents and pages and (2) processing of 10% of the total documents and 30% of the total pages. Capital equipment, labor, and summary cost tables for the years from 1987 through 1991 are presented for both scenarios. The report also describes a case for starting system operations in 1988 instead of 1987 and complete cost tables for the 1988 start-up case are given. 1 ref

  20. Supplemental report on cost estimates'

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis

  1. Alcoholism treatment and medical care costs from Project MATCH.

    Science.gov (United States)

    Holder, H D; Cisler, R A; Longabaugh, R; Stout, R L; Treno, A J; Zweben, A

    2000-07-01

    This paper examines the costs of medical care prior to and following initiation of alcoholism treatment as part of a study of patient matching to treatment modality. Longitudinal study with pre- and post-treatment initiation. The total medical care costs for inpatient and outpatient treatment for patients participating over a span of 3 years post-treatment. Three treatment sites at two of the nine Project MATCH locations (Milwaukee, WI and Providence, RI). Two hundred and seventy-nine patients. Patients were randomly assigned to one of three treatment modalities: a 12-session cognitive behavioral therapy (CBT), a four-session motivational enhancement therapy (MET) or a 12-session Twelve-Step facilitation (TSF) treatment over 12 weeks. Total medical care costs declined from pre- to post-treatment overall and for each modality. Matching effects independent of clinical prognosis showed that MET has potential for medical-care cost-savings. However, patients with poor prognostic characteristics (alcohol dependence, psychiatric severity and/or social network support for drinking) have better cost-savings potential with CBT and/or TSF. Matching variables have significant importance in increasing the potential for medical-care cost-reductions following alcoholism treatment.

  2. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  3. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    Energy Technology Data Exchange (ETDEWEB)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  4. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  5. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  6. Prototype road weather performance management tool : project report : draft report.

    Science.gov (United States)

    2016-09-30

    This report is the Project Report for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Uses Connected Vehicle Data (RW-...

  7. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  8. Management of water hyacinth. A CSC/UNEP project. Progress report

    International Nuclear Information System (INIS)

    1981-05-01

    The water hyacinth project was initially proposed at the Regional Workshop on Rural Technology held at Dacca in January 1978. In November 1978, national coordinators met at New Delhi and outlined the project in detail as reported in CSC(79)RT-4. The meeting was attended by delegates from Bangladesh, Egypt, Guyana, India, Malaysia, Papua New Guinea, Sri Lanka, Commonwealth Science Council and the United Nations Environment Programme. Following this a proposal was submitted to UNEP seeking funding support to meet the external cost component of the project. This support was subsequently granted. The project aims to achieve an integrated approach towards managing water hyacinth. The underlying intention was that management would cover both eradication of the plant as well as making productive use of it when possible. Productive uses envisaged include biogas synthesis, production of papers and boards and as a source of proteins. Another interesting possibility is the use of the plant to control industrial as well as domestic water pollution . All these were detailed in a three and a half year time plan. The project had its first review meeting in June 1979 in Papua New Guinea. The major intention of this meeting was to examine status reports from each country in an attempt to quantify the problem caused by water hyacinth and assess the work plan in relation to this. The report of this meeting has been published as CSC(79)RT-5. At this meeting Papua New Guinea decided to withdraw from this project as water hyacinth was not regarded as a severe problem. The use of dugong as a control agent was not recommended by Papua New Guinea. In April 1980 an interim review meeting attended by the Regional Coordinator and representatives of UNEP and CSC was held in London where, based on the progress made in the participating countries, activities and time schedules were refined and sharpened (CSC (80)RT-16). It look some time to resolve the external funding question . It was

  9. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  10. 13. status report of the project HDR safety program of Kernforschungszentrum Karlsruhe. Working report 05.46/89

    International Nuclear Information System (INIS)

    Katzenmeier, G.

    1989-01-01

    The programme phase III, which extends to the end of 1991, is divided into the part projects containment behaviour in extreme accidents, long-term damage and monitoring the components in operation, behaviour of damaged components in dynamic accidents and large fires of actual materials. The main aims, state of the HDR safety programme, main points of the programme for 1990 and 8 technical reports on phase II and III are documented. There is a survey of costs. (DG) [de

  11. Community Mental Health Clinic Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Healthcare Cost Report Information System (HCRIS) Dataset - Community Mental Health Center (CMHC). This data was reported on form CMS-2088-92. The data in this...

  12. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  13. CALiPER Report 21.3. Cost Effectiveness of Linear (T8) LED Lamps

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-05-01

    Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15 minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.

  14. CALiPER Report 21.3: Cost-Effectiveness of Linear (T8) LED Lamps

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Naomi J.; Perrin, Tess E.; Royer, Michael P.

    2014-05-27

    Meeting performance expectations is important for driving adoption of linear LED lamps, but cost-effectiveness may be an overriding factor in many cases. Linear LED lamps cost more initially than fluorescent lamps, but energy and maintenance savings may mean that the life-cycle cost is lower. This report details a series of life-cycle cost simulations that compared a two-lamp troffer using LED lamps (38 W total power draw) or fluorescent lamps (51 W total power draw) over a 10-year study period. Variables included LED system cost ($40, $80, or $120), annual operating hours (2,000 hours or 4,000 hours), LED installation time (15 minutes or 30 minutes), and melded electricity rate ($0.06/kWh, $0.12/kWh, $0.18/kWh, or $0.24/kWh). A full factorial of simulations allows users to interpolate between these values to aid in making rough estimates of economic feasibility for their own projects. In general, while their initial cost premium remains high, linear LED lamps are more likely to be cost-effective when electric utility rates are higher than average and hours of operation are long, and if their installation time is shorter.

  15. AN ENHANCED MODEL TO ESTIMATE EFFORT, PERFORMANCE AND COST OF THE SOFTWARE PROJECTS

    Directory of Open Access Journals (Sweden)

    M. Pauline

    2013-04-01

    Full Text Available The Authors have proposed a model that first captures the fundamentals of software metrics in the phase 1 consisting of three primitive primary software engineering metrics; they are person-months (PM, function-points (FP, and lines of code (LOC. The phase 2 consists of the proposed function point which is obtained by grouping the adjustment factors to simplify the process of adjustment and to ensure more consistency in the adjustments. In the proposed method fuzzy logic is used for quantifying the quality of requirements and is added as one of the adjustment factor, thus a fuzzy based approach for the Enhanced General System Characteristics to Estimate Effort of the Software Projects using productivity has been obtained. The phase 3 takes the calculated function point from our work and is given as input to the static single variable model (i.e. to the Intermediate COCOMO and COCOMO II for cost estimation. The Authors have tailored the cost factors in intermediate COCOMO and both; cost and scale factors are tailored in COCOMO II to suite to the individual development environment, which is very important for the accuracy of the cost estimates. The software performance indicators are project duration, schedule predictability, requirements completion ratio and post-release defect density, are also measured for the software projects in my work. A comparative study for effort, performance measurement and cost estimation of the software project is done between the existing model and the authors proposed work. Thus our work analyzes the interaction¬al process through which the estimation tasks were collectively accomplished.

  16. Final Technical Report Power through Policy: "Best Practices" for Cost-Effective Distributed Wind

    Energy Technology Data Exchange (ETDEWEB)

    Rhoads-Weaver, Heather; Gagne, Matthew; Sahl, Kurt; Orrell, Alice; Banks, Jennifer

    2012-02-28

    necessary. The ranking of distributed wind state policy and economic environments summarized in the attached report, based on the Policy Tool's default COE results, highlights favorable market opportunities for distributed wind growth as well as market conditions ripe for improvement. Best practices for distributed wind state policies are identified through an evaluation of their effect on improving the bottom line of project investments. The case studies and state rankings were based on incentives, power curves, and turbine pricing as of 2010, and may not match the current results from the Policy Tool. The Policy Tool can be used to evaluate the ways that a variety of federal and state policies and incentives impact the economics of distributed wind (and subsequently its expected market growth). It also allows policymakers to determine the impact of policy options, addressing market challenges identified in the U.S. DOE's '20% Wind Energy by 2030' report and helping to meet COE targets. In providing a simple and easy-to-use policy comparison tool that estimates financial performance, the Policy Tool and guidebook are expected to enhance market expansion by the small wind industry by increasing and refining the understanding of distributed wind costs, policy best practices, and key market opportunities in all 50 states. This comprehensive overview and customized software to quickly calculate and compare policy scenarios represent a fundamental step in allowing policymakers to see how their decisions impact the bottom line for distributed wind consumers, while estimating the relative advantages of different options available in their policy toolboxes. Interested stakeholders have suggested numerous ways to enhance and expand the initial effort to develop an even more user-friendly Policy Tool and guidebook, including the enhancement and expansion of the current tool, and conducting further analysis. The report and the project's Guidebook include

  17. SolAir. Innovative solar collectors for efficient and cost-effective solar thermal power generation - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Barbato, M. C.; Haueter, Ph.; Bader, R.; Steinfeld, A.; Pedretti, A.

    2008-12-15

    This report presents the main results of the project. The project has been started at the end of 2007 and has been successfully finished in December 2008. The present project of ALE AirLight Energy aims at the engineering investigation and design of a novel concept of a solar collector system for efficient and cost-effective solar thermal power generation. The technology exploits an air-inflated reflective structure to concentrate solar radiation. This new arrangement reduces investment costs of the collector field and promises to be economically competitive. A first prototype, built in 2007, has been redesigned and heavily modified during this project. In the new configuration, by using secondary mirrors, the focal area is located close to the main structure and allows the integration of the receiver into the inflated structure. The topics developed in this document are as follows: (i) Design solutions for the concentrated energy receiver suitable for the revised SolAir concentrator concept. (ii) Solar flux simulation via Monte Carlo method. (iii) New version of the ALE AirLight Energy concentrator prototype. (iv) Prototype radiative flux measurements. (author)

  18. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  19. IFMIF (International Fusion Materials Irradiation Facility) conceptual design activity reduced cost report

    International Nuclear Information System (INIS)

    2000-02-01

    This report describes the results of a preliminary reevaluation of the design and cost of the International Fusion Materials Irradiation Facility (IFMIF) Project in response to the request from the 28th FPCC meeting in January 1999. Two major ideas have been considered: 1) reduction of the total construction cost through elimination of the previously planned facility upgrade and 2) a facility deployment in 3 stages with capabilities for limited experiments in the first stage. As a result, the size and complexity of the facility could be significantly reduced, leading to substantial cost savings. In addition to these two ideas, this study also included a critical review of the original CDA specification with the objective of elimination of nonessential items. For example, the number of lithium targets was reduced from two to one. As a result of these changes in addition to the elimination of the upgrade, the total cost estimate was very substantially reduced from 797.2 MICF to 487.8 MICF, where 1 MICF = 1 Million of the IFMIF Conversion Units (approximately $1M US January, 1996). (author)

  20. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  1. Resource Roads demonstration project : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  2. UMTRA project list of reportable occurrences

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

  3. UMTRA project list of reportable occurrences

    International Nuclear Information System (INIS)

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items

  4. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  5. Life cycle cost report of VHLW cask

    International Nuclear Information System (INIS)

    1995-06-01

    This document, the Life Cycle Cost Report (LCCR) for the VHLW Cask, presents the life cycle costs for acquiring, using, and disposing of the VHLW casks. The VHLW cask consists of a ductile iron cask body, called the shielding insert, which is used for storage and transportation, and ultimately for disposal of Defense High Level Waste which has been vitrified and placed into VHLW canisters. Each ductile iron VHLW shielding insert holds one VHLW canister. For transportation, the shielding insert is placed into a containment overpack. The VHLW cask as configured for transportation is a legal weight truck cask which will be licensed by NRC. The purpose of this LCCR is to present the development of the life cycle costs for using the VHLW cask to transport VHLW canisters from the generating sites to a disposal site. Life cycle costs include the cost of acquiring, operating, maintaining, and ultimately dispositioning the VHLW cask and its associated hardware. This report summarizes costs associated with transportation of the VHLW casks. Costs are developed on the basis of expected usage, anticipated source and destination locations, and expected quantities of VHLW which must be transported. DOE overhead costs, such as the costs associated with source and destination facility handling of the VHLW, are not included. Also not included are costs exclusive to storage or disposal of the VHLW waste

  6. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  7. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  8. Project-based physics labs using low-cost open-source hardware

    Science.gov (United States)

    Bouquet, F.; Bobroff, J.; Fuchs-Gallezot, M.; Maurines, L.

    2017-03-01

    We describe a project-based physics lab, which we proposed to third-year university students. These labs are based on new open-source low-cost equipment (Arduino microcontrollers and compatible sensors). Students are given complete autonomy: they develop their own experimental setup and study the physics topic of their choice. The goal of these projects is to let students to discover the reality of experimental physics. Technical specifications of the acquisition material and case studies are presented for practical implementation in other universities.

  9. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  10. (abstract) Science-Project Interaction in the Low-Cost Mission

    Science.gov (United States)

    Wall, Stephen D.

    1994-01-01

    Large, complex, and highly optimized missions have performed most of the preliminary reconnaisance of the solar system. As a result we have now mapped significant fractions of its total surface (or surface-equivalent) area. Now, however, scientific exploration of the solar system is undergoing a major change in scale, and existing missions find it necessary to limit costs while fulfilling existing goals. In the future, NASA's Discovery program will continue the reconnaisance, exploration, and diagnostic phases of planetary research using lower cost missions, which will include lower cost mission operations systems (MOS). Historically, one of the more expensive functions of MOS has been its interaction with the science community. Traditional MOS elements that this interaction have embraced include mission planning, science (and engineering) event conflict resolution, sequence optimization and integration, data production (e.g., assembly, enhancement, quality assurance, documentation, archive), and other science support services. In the past, the payoff from these efforts has been that use of mission resources has been highly optimized, constraining resources have been generally completely consumed, and data products have been accurate and well documented. But because these functions are expensive we are now challenged to reduce their cost while preserving the benefits. In this paper, we will consider ways of revising the traditional MOS approach that might save project resources while retaining a high degree of service to the Projects' customers. Pre-launch, science interaction can be made simplier by limiting numbers of instruments and by providing greater redundancy in mission plans. Post launch, possibilities include prioritizing data collection into a few categories, easing requirements on real-time of quick-look data delivery, and closer integration of scientists into the mission operation.

  11. Projected costs of generating electricity - 2005 update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The joint IEA/NEA study provides generation cost estimates for over a hundred power plants that use a variety of fuels and technologies. These include coal-fired, gas-fired, nuclear, hydro, solar and wind plants. Cost estimates are also given for combined heat and power plants that use coal, gas and combustible renewables. Data and information for this study were provided by experts from 19 OECD member countries and 3 non-member countries. The power plants examined in the study use technologies available today. The study shows that the competitiveness of alternative generation sources and technologies ultimately depends on many parameters: there is no clear-cut 'winner'. Major issues related to generation costs addressed in the report include: descriptions of state-of-the-art generation technologies; the methodologies for incorporating risk in cost assessments; the impact of carbon emission trading; and how to integrate wind power into the electricity grid. 24 figs., 38 tabs., 11 apps.

  12. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  13. Community-Level Impacts Projection System (CLIPS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Monts, J.K.; Bareiss, E.R.

    1979-02-01

    The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands and spatial location; to estimate how many in-migrating workers will be required; to estimate the demographic characteristics of the in-migrating workers (e.g., how many elementary school children they will bring); to estimate how many additional secondary employment opportunities (e.g., employment in eating and drinking establishments and grocery stores) will be generated; to estimate what the local area's population levels in various age groups would be both with the project and without it; to estimate community population levels for both the impact case and the baseline case; and to estimate the approximate resource requirements and costs for providing additional municipal facilities and services (e.g., water treatment and distribution, wastewater treatment and collection, gas and electric distribution, police and fire protection, etc.)

  14. Benefit–cost analysis of non-marginal climate and energy projects

    International Nuclear Information System (INIS)

    Dietz, Simon; Hepburn, Cameron

    2013-01-01

    Conventional benefit–cost analysis incorporates the normally reasonable assumption that the policy or project under examination is marginal. Among the assumptions this entails is that the policy or project is small, so the underlying growth rate of the economy does not change. However, this assumption may be inappropriate in some important circumstances, including in climate-change and energy policy. One example is global targets for carbon emissions, while another is a large renewable energy project in a small economy, such as a hydropower dam. This paper develops some theory on the evaluation of non-marginal projects, with empirical applications to climate change and energy. We examine the conditions under which evaluation of a non-marginal project using marginal methods may be wrong, and in our empirical examples we show that both qualitative and large quantitative errors are plausible. - Highlights: • This paper develops the theory of the evaluation of non-marginal projects. • It also includes empirical applications to climate change and energy. • We show when evaluation of a non-marginal project using marginal methods is wrong

  15. SECON - A tool for estimation of storage costs and storage project revenue

    International Nuclear Information System (INIS)

    Hall, O.

    1997-01-01

    The SECON model Storage ECONomics is useful for gas suppliers, storage operators, gas distributors and consumers when investigating new storage possibilities. SECON has been used within the Sydkraft group to compare cost for different types of storage and to identify the market niche for lined rock cavern (LRC) storage. In the model cost for the different storage types, salt caverns, LNG, and LRC can be compared. By using input according to market needs each storage type can be validated for a specific service e.g. peak shaving, seasonal storage or balancing. The project revenue can also be calculated. SECON includes three models for income calculation; US storage service, Trading and Avoided Supply Contract Costs. The income models calculates annual turnover, pay of time, net present value, internal rate of return and max. liquidity shortfall for the project. The SECON will facilitate sensitivity analysis both regarding cost for different services and different storage types and on the income side by using different scenarios. At the poster session SECON will be presented live and the delegates will have the opportunity to test the model. (au)

  16. Vulnerability in Determining the Cost of Information System Project to Avoid Loses

    Science.gov (United States)

    Haryono, Kholid; Ikhsani, Zulfa Amalia

    2018-03-01

    Context: This study discusses the priority of cost required in software development projects. Objectives: To show the costing models, the variables involved, and how practitioners assess and decide the priorities of each variable. To strengthen the information, each variable also confirmed the risk if ignored. Method: The method is done by two approaches. First, systematic literature reviews to find the models and variables used to decide the cost of software development. Second, confirm and take judgments about the level of importance and risk of each variable to the software developer. Result: Obtained about 54 variables that appear on the 10 models discussed. The variables are categorized into 15 groups based on the similarity of meaning. Each group becomes a variable. Confirmation results with practitioners on the level of importance and risk. It shown there are two variables that are considered very important and high risk if ignored. That is duration and effort. Conclusion: The relationship of variable rates between the results of literature studies and confirmation of practitioners contributes to the use of software business actors in considering project cost variables.

  17. Fusion Simulation Project Workshop Report

    Science.gov (United States)

    Kritz, Arnold; Keyes, David

    2009-03-01

    The mission of the Fusion Simulation Project is to develop a predictive capability for the integrated modeling of magnetically confined plasmas. This FSP report adds to the previous activities that defined an approach to integrated modeling in magnetic fusion. These previous activities included a Fusion Energy Sciences Advisory Committee panel that was charged to study integrated simulation in 2002. The report of that panel [Journal of Fusion Energy 20, 135 (2001)] recommended the prompt initiation of a Fusion Simulation Project. In 2003, the Office of Fusion Energy Sciences formed a steering committee that developed a project vision, roadmap, and governance concepts [Journal of Fusion Energy 23, 1 (2004)]. The current FSP planning effort involved 46 physicists, applied mathematicians and computer scientists, from 21 institutions, formed into four panels and a coordinating committee. These panels were constituted to consider: Status of Physics Components, Required Computational and Applied Mathematics Tools, Integration and Management of Code Components, and Project Structure and Management. The ideas, reported here, are the products of these panels, working together over several months and culminating in a 3-day workshop in May 2007.

  18. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  19. SMART 3D SUBSURFACE CONTAMINANT CHARACTERIZATION AT THE BGRR DECOMMISSIONING PROJECT. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT

    International Nuclear Information System (INIS)

    HEISER, J.; KALB, P.; SULLIVAN, T.; MILIAN, L.

    2001-01-01

    The Brookhaven Graphite Research Reactor (BGRR), which operated from 1951--1968 is currently undergoing decontamination and decommissioning (D and D). As part of this effort, many of the major structures and facilities (e.g., Above Grade Ducts, Cooling Fans, Pile Fan Sump, Transfer Canal and Instruments Houses) are being removed to eliminate contaminants and reduce the footprint of the overall facility. However, a significant cost savings (almost $5M) can potentially be realized if the large concrete Below Grade Ducts (BGD) can be decontaminated and left in place. In order to do this, soils beneath the ducts must be fully characterized to identify areas where contaminants may have leaked, what radioactive and hazardous contaminants remain, and in what concentrations. This information will then be used to evaluate whether discrete areas of localized contaminated soil can be selectively removed or, if the contamination is significant and widespread, and whether the ducts themselves must be removed for complete cleanup. The information generated from this effort is input into the BGRR BGD Characterization Report and an Engineering Evaluation/Cost Analysis (EE/CA) currently being prepared to evaluate potential options for the ducts. This FY01 Department of Energy Accelerated Site Technology Deployment (DOE ASTD) project combined a suite of innovative technologies to provide cost-effective characterization of the soils beneath the BGD and present the data in an easily understandable three-dimensional representation of the contaminant concentrations beneath the ducts. Conventional characterization of the soil would have required sampling a very large area in a tight grid pattern to ensure that all areas of potential contamination were evaluated. It is estimated that using baseline techniques would require approximately 2500 samples (costing ∼$1.6M), depending on the level of precision required by regulators. This massive amount of data would then be difficult to

  20. 24 CFR Appendix A to Part 570 - Guidelines and Objectives for Evaluating Project Costs and Financial Requirements

    Science.gov (United States)

    2010-04-01

    ... breakdown of all project costs and that each cost element making up the project be reviewed for... either a firm commitment of its funds or a decision not to participate in the project; and B. Equity... his/her motivation remains high to pursue the business with vigor. The amount, type and terms of the...

  1. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  2. Nuclear power plant decommissioning costs in perspective

    International Nuclear Information System (INIS)

    Rothwell, Geoffrey; Deffrennes, Marc; Weber, Inge

    2016-01-01

    At the international level, actual experience is limited in the completion of nuclear power plant decommissioning projects. Cost data for decommissioning projects are thus largely unavailable, with few examples of analyses or comparisons between estimates and actual costs at the project level. The Nuclear Energy Agency (NEA) initiated a project to address this knowledge gap and in early 2016 published the outcomes in the report on Costs of Decommissioning Nuclear Power Plants. The study reviews decommissioning costs and funding practices adopted by NEA member countries, based on the collection and analysis of survey data via a questionnaire. The work was carried out in co-operation with the International Atomic Energy Agency (IAEA) and the European Commission (EC). (authors)

  3. [A cost-benefit analysis of occupational disease reporting in China].

    Science.gov (United States)

    Tang, X Z; Zeng, Q; Liu, D S

    2017-03-20

    Objective: To perform a cost-benefit analysis of the occupational disease reporting system in China, and to provide a basis for effective resource allocation. Methods: The data on the cost of occupational diseases were collected from China Health Statistics Yearbook 2013, the estimated benefit data were collected from published articles in China and foreign countries, and the probability data were collected from the occupational diseasereports published by health and family planning administrative departments. Adecision-making tree was used for the cost-benefit analysis. Results: The estimated cost of occupational disease reporting was about 102.47 million yuan/year, consisting of a cost of reporting in national medical institutions of 1.25 million yuan/year, a management cost of 30.35 million yuan/year, a management cost in local public health institutions of 69.80 million yuan/year, a management cost in national public health institutions of 370 thousand yuan/year, and a cost of construction and maintenance of reporting system of 700 thousand yuan/year. The results of the decision tree analysis showed that when an occupational disease monitoring system was established, the incremental input for occupational disease monitoring and prevention/control was 2.1 billion yuan/year, the output was 6.5 billion yuan/year, and the benefit of occupational disease reporting system was 4.4 billion yuan/year. Conclusion: The benefit of occupational disease reporting system depends on the cost-benefit of occupational disease prevention and control measures, and proper prevention and control measures are extremely important for improving the benefit of occupational disease reporting system.

  4. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  5. The Distributed Wind Cost Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, Trudy; Jimenez, Tony; Preus, Robert; Tegen, Suzanne; Baring-Gould, Ian

    2017-03-28

    To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbine costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.

  6. Evolution of investment costs related to wood energy collective installations (2000-2006). Final report - Synthesis

    International Nuclear Information System (INIS)

    2009-04-01

    Based on a survey on 90 French projects, and on a comparison with 76 German projects and 36 Austrian projects, this document proposes a synthesis of a study which aimed at identifying and analysing the evolution of investment costs for wood collective heating systems between 2000 and 2006. Data are analysed and commented while stressing their limitations which are related to their quality, to project heterogeneity, to economic value scattering. The evolution of investment costs of French projects is analysed in terms of global cost, and of items (heat production, public works, studies and construction, item ratios)

  7. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  8. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  9. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  10. Projected Costs of Informal Caregiving for Cardiovascular Disease: 2015 to 2035: A Policy Statement From the American Heart Association.

    Science.gov (United States)

    Dunbar, Sandra B; Khavjou, Olga A; Bakas, Tamilyn; Hunt, Gail; Kirch, Rebecca A; Leib, Alyssa R; Morrison, R Sean; Poehler, Diana C; Roger, Veronique L; Whitsel, Laurie P

    2018-05-08

    In a recent report, the American Heart Association estimated that medical costs and productivity losses of cardiovascular disease (CVD) are expected to grow from $555 billion in 2015 to $1.1 trillion in 2035. Although the burden is significant, the estimate does not include the costs of family, informal, or unpaid caregiving provided to patients with CVD. In this analysis, we estimated projections of costs of informal caregiving attributable to CVD for 2015 to 2035. We used data from the 2014 Health and Retirement Survey to estimate hours of informal caregiving for individuals with CVD by age/sex/race using a zero-inflated binomial model and controlling for sociodemographic factors and health conditions. Costs of informal caregiving were estimated separately for hypertension, coronary heart disease, heart failure, stroke, and other heart disease. We analyzed data from a nationally representative sample of 16 731 noninstitutionalized adults ≥54 years of age. The value of caregiving hours was monetized by the use of home health aide workers' wages. The per-person costs were multiplied by census population counts to estimate nation-level costs and to be consistent with other American Heart Association analyses of burden of CVD, and the costs were projected from 2015 through 2035, assuming that within each age/sex/racial group, CVD prevalence and caregiving hours remain constant. The costs of informal caregiving for patients with CVD were estimated to be $61 billion in 2015 and are projected to increase to $128 billion in 2035. Costs of informal caregiving of patients with stroke constitute more than half of the total costs of CVD informal caregiving ($31 billion in 2015 and $66 billion in 2035). By age, costs are the highest among those 65 to 79 years of age in 2015 but are expected to be surpassed by costs among those ≥80 years of age by 2035. Costs of informal caregiving for patients with CVD represent an additional 11% of medical and productivity costs

  11. Conceptual design report, 219-S secondary containment upgrade, Project W-178

    International Nuclear Information System (INIS)

    Beyer, J.J.

    1993-05-01

    The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000

  12. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    Science.gov (United States)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  13. 2013 Cost of Wind Energy Review

    Energy Technology Data Exchange (ETDEWEB)

    Mone, C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Smith, A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Maples, B. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-02-01

    This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

  14. West Hackberry Tertiary Project. Annual report, September 3, 1997--September 2, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Gillham, T.H.

    1997-09-10

    The following report is the Project Management Plan for the fifth year of the West Hackberry Tertiary Project. The West Hackberry Tertiary Project is one of four mid-term projects selected by the United States Department of Energy (DOE) as part of the DOE`s Class 1 Program for the development of advance recovery technologies in fluvial dominated deltaic reservoirs. The West Hackberry Tertiary Project is a field test of the idea that air injection can be combined with the Double Displacement Process to produce a low cost tertiary recovery process which is economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. The Double Displacement Process is based upon the concept that in fields such as West Hackberry waterdrive recoveries are typically 50%-60% of the original oil in place while gravity drainage recoveries average 80%-90% of the original oil in place. Therefore, by injecting a gas into a watered out reservoir, a gas cap will form an additional oil can be recovered due to gravity drainage. Although the Double Displacement Process has been shown to be successful in recovering tertiary oil in other fields, this project will be the first to utilize air injection in the Double Displacement Process. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery due to the combustion process. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs where tertiary oil recovery is presently uneconomical.

  15. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  16. Implementation of the international structure for decommissioning costing; examples and related IAEA projects - 59313

    International Nuclear Information System (INIS)

    Daniska, Vladimir; Laraia, Michele; O'Sullivan, Patrick

    2012-01-01

    In 1999, IAEA, the OECD Nuclear Energy Agency and the European Commission jointly proposed the standardised listing of decommissioning activities [1] to serve as a general basis for presentation of decommissioning costs and for promoting the harmonisation in decommissioning costing. The standardised listing of activities [1] was developed in three hierarchical levels based on analysis of typical decommissioning activities identified in various decommissioning projects. The structure [1] has been currently updated by the same organisations as the International Structure for Decommissioning Costing (ISDC) based on the experience gained over ten years of use of the original standardised listing [2]. First part of the paper presents the revised ISDC. The principle of the three-level original hierarchical structure has been preserved. Re-definition of the content and re-structuring was done to avoid ambiguity and to ensure comprehensiveness. Paper presents two basic approaches for implementation of the ISDC structure in costing - converting the cost data available in specific cost structures, mostly according the work breakdown structures of decommissioning projects into ISDC and implementation of the ISDC as the cost calculation structure. Examples of the second approach are given to show that this approach is feasible and may have several advantages. An ORACLE based costing model with implemented of the extended ISDC for detailed costing and an Excel based costing model for preliminary costing at IAEA for research reactors are given. (authors)

  17. Final Project Report

    DEFF Research Database (Denmark)

    Duer, Karsten

    1997-01-01

    The report summarizes the work that has been carried out within the project "B1 AEROGELS" as a part of the IEA SH&CP Task 18 "Advanced Glazing and Associated Materials For SolarAnd Building Applications". By providing at the same time thermal insulation and transparency the silica aerogel is a very...

  18. Final Technical Report Advanced Anchoring Technology DOE Award Number DE-EE0003632 Project Period 09/10 - 09/12

    Energy Technology Data Exchange (ETDEWEB)

    Meggitt, Dallas J

    2012-11-09

    It is generally conceded that the costs associated with current practices for the mooring, anchoring, or foundation systems of Marine HydroKinetic (MHK) and Deepwater Floating Wind systems are a disproportionate portion of the total cost of an installed system. Reducing the cost of the mooring and anchoring components for MHK systems can contribute substantially to reducing the levelized cost of electricity (LCOE). Micropile anchors can reduce the LCOE both directly, because the anchors, associated mooring hardware and installation costs are less than conventional anchor and mooring systems, but also because micropile anchors require less extensive geotechnical surveys for confident design and proper implementation of an anchor or foundation system. This report presents the results of the development of critical elements of grouted marine micropile anchor (MMA) technology for application to MHK energy conversion systems and other ocean engineering applications that require fixing equipment to the seafloor. Specifically, this project identified grout formulations and developed designs for grout dispensing systems suitable for use in a seawater environment as a critical development need for successful implementation of practical MMA systems. The project conducted a thorough review of available information on the use of cement-based grouts in seawater. Based on this review and data available from commercial sources, the project selected a range of grout formulations for testing as part of a micropile system. The project also reviewed instrumentation for measuring grout density, pressure and flow rate, and integrated an instrumentation system suitable for use with micropile installation. The grout formulations and instrumentation system were tested successfully and demonstrated the suitability of MMA technology for implementation into anchor systems for MHK and other marine renewable energy systems. In addition, this project developed conceptual designs for micropile

  19. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  20. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  1. Administration and transaction cost estimates for a greenhouse gas offset system : final report

    International Nuclear Information System (INIS)

    2004-01-01

    Canada's Climate Change Plan provides large final emitters (LFEs) with the option to meet their emission targets through the purchase of domestic greenhouse gas (GHG) offset credits. This paper presents the results of a study which identified and estimated transaction costs associated with an offset system. The cost to both proponents and governments were identified. The study also suggested ways to reduce administration and transaction costs through design options. The study considered projects involving agriculture, forests, landfill gas capture, renewable energy and energy efficiency within a potential domestic offset system. It was determined that average transaction costs per tonne range from $19 per tonne to $0.05 depending on the design choice and project type. Total administration costs did not vary more than 5 per cent between different design choices. The total system costs, which are the combination of all transaction and administration costs, are the best indicator for the potential of a project. Eight case studies were examined and costs per tonne were presented. According to the results, the best opportunities to reduce both transaction and administration costs are to choose a broad approach to baselines, boundaries and quantification; and, to allow pooling in the forestry and agriculture sectors. Transaction costs can be lowered further by reducing the frequency of monitoring and verification and allowing pre-2008 crediting. refs., tabs., figs

  2. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  3. Cost Assessment Methodology and Economic Viability of Tidal Energy Projects

    Directory of Open Access Journals (Sweden)

    Eva Segura

    2017-11-01

    Full Text Available The exploitation of technologies with which to harness the energy from ocean currents will have considerable possibilities in the future thanks to their enormous potential for electricity production and their high predictability. In this respect, the development of methodologies for the economic viability of these technologies is fundamental to the attainment of a consistent quantification of their costs and the discovery of their economic viability, while simultaneously attracting investment in these technologies. This paper presents a methodology with which to determine the economic viability of tidal energy projects, which includes a technical study of the life-cycle costs into which the development of a tidal farm can be decomposed: concept and definition, design and development, manufacturing, installation, operation and maintenance and dismantling. These cost structures are additionally subdivided by considering their sub-costs and bearing in mind the main components of the tidal farm: the nacelle, the supporting tidal energy converter structure and the export power system. Furthermore, a technical study is developed in order to obtain an estimation of the annual energy produced (and, consequently, the incomes generated if the electric tariff is known by considering its principal attributes: the characteristics of the current, the ability of the device to capture energy and its ability to convert and export the energy. The methodology has been applied (together with a sensibility analysis to the particular case of a farm composed of first generation tidal energy converters in one of the Channel Island Races, the Alderney Race, in the U.K., and the results have been attained by means of the computation of engineering indexes, such as the net present value, the internal rate of return, the discounted payback period and the levelized cost of energy, which indicate that the proposed project is economically viable for all the case studies.

  4. Abbreviated report of the critical analysis of the spent nuclear fuel project's activity-based cost estimate

    International Nuclear Information System (INIS)

    Warren, R.N.

    1998-01-01

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI's review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI's review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI's scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES

  5. Deterministic Assessment of Future Costs for Dismantling (FA)

    Energy Technology Data Exchange (ETDEWEB)

    Vasko, Marek [DECOM, Trnava (Slovakia)

    2012-11-01

    The main objective of the report is to provide an re-evaluation of cost calculations by OMEGA code for the Intermediate Storage for Spent Fuel in Studsvik (FA facility) using up-to-date Swedish labour cost unit factors and available up-to-date Swedish (or international) cost unit factors for consumables, materials and substances. Furthermore, evolution of other OMEGA database parameters concerning cost calculations e.g. manpower unit factors and workgroups parameters are taken into account. This report follows up former project which introduced tentative calculations of main decommissioning parameters such as costs, manpower and exposure of personnel for activities of older nuclear facility decommissioning in Sweden represented by FA Facility in Studsvik by means of calculation code OMEGA. The project demonstrated an implementation of advanced costing methodology based on PSL structure format to achieve transparent, traceable and comparable estimates even for older nuclear facilities like FA Facility in Studsvik. This former project used Slovak origin labour costs unit factors and other cost unit factors. After successful completion of this project, there was an intent of SSM to reevaluate calculations using an up-to-date Swedish labour cost data and also available Swedish consumables and materials cost data if available. Within this report re-calculations of main decommissioning parameters using available Swedish data are presented in structure according to Proposed Standardized List of Items for Costing Purposes. Calculations are made for decommissioning scenario with post-dismantling decontamination and steel radwaste melting technologies available at the site. All parameters are documented and summed up in both table and graphic forms in text and Annexes. Further, comparison of calculated results with previous calculations together with discussion is provided.

  6. Deterministic Assessment of Future Costs for Dismantling (FA)

    International Nuclear Information System (INIS)

    Vasko, Marek

    2012-03-01

    The main objective of the report is to provide an re-evaluation of cost calculations by OMEGA code for the Intermediate Storage for Spent Fuel in Studsvik (FA facility) using up-to-date Swedish labour cost unit factors and available up-to-date Swedish (or international) cost unit factors for consumables, materials and substances. Furthermore, evolution of other OMEGA database parameters concerning cost calculations e.g. manpower unit factors and workgroups parameters are taken into account. This report follows up former project which introduced tentative calculations of main decommissioning parameters such as costs, manpower and exposure of personnel for activities of older nuclear facility decommissioning in Sweden represented by FA Facility in Studsvik by means of calculation code OMEGA. The project demonstrated an implementation of advanced costing methodology based on PSL structure format to achieve transparent, traceable and comparable estimates even for older nuclear facilities like FA Facility in Studsvik. This former project used Slovak origin labour costs unit factors and other cost unit factors. After successful completion of this project, there was an intent of SSM to reevaluate calculations using an up-to-date Swedish labour cost data and also available Swedish consumables and materials cost data if available. Within this report re-calculations of main decommissioning parameters using available Swedish data are presented in structure according to Proposed Standardized List of Items for Costing Purposes. Calculations are made for decommissioning scenario with post-dismantling decontamination and steel radwaste melting technologies available at the site. All parameters are documented and summed up in both table and graphic forms in text and Annexes. Further, comparison of calculated results with previous calculations together with discussion is provided

  7. Sectoral Costs of Environmental Policy. Final Report

    International Nuclear Information System (INIS)

    Vercaemst, P.; Vanassche, S.; Campling, P.; Vranken, L.; Agnolucci, P.; Salmons, R.; Shaw, B.; Jantzen, J.; Van der Woerd, H.; Gruenig, M.; Best, A.

    2007-12-01

    The Directorate General for Environment of the European Commission has launched a study on the 'Sectoral costs of environmental policy'. The overall aim of the study is to obtain a clearer picture of the impact of environmental policy in some of the industrial sectors most affected by environmental policy, taking into account the differences between sectors and Member States. Previous studies mainly focussed on the individual impact of one Directive, but in this study we will assess the cumulative costs attributable to the environmental policy in its entirety and attempt to identify synergies between individual policies. The project has the following main objectives: paint a clearer picture of the environmental costs for the selected industries; indicate the differences in costs between individual companies; indicate the differences in costs between Member States; demonstrate the drivers for environmental expenditures of the companies and differences between sectors and Member States; describe different types of environmental regulation (policy instruments) and their impact on environmental expenditures; evaluate the environmental performance of the industries and differences between companies/Member States; collect evidence for the impacts of environmental regulation (and associated costs) on the competitiveness of companies; and carry out an international comparison. The sectors selected are:oil supply chain; electricity production; steel industry; and textile and leather industry

  8. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Conditions Must be Met by a Grantee? § 637.41 What are the cost restrictions on design...

  9. FY2011 Annual Report for NREL Energy Storage Projects

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  10. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Science.gov (United States)

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  11. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  12. Cryogenic Barrier Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  13. Highway Safety Data : costs, quality, and strategies for improvement : research report

    Science.gov (United States)

    1998-01-01

    The goal of this project was to analyze the collection and management of highway safety data by identifying issues and costs, and proposing means of resolving those issues and reducing the costs. Initial emphasis addressed known elements of the highw...

  14. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  15. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  16. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  17. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Russell, E.W.; Clarke, W. [Lawrence Livermore National Lab., CA (United States); Domian, H.A. [Babcock and Wilcox Co., Lynchburg, VA (United States); Madson, A.A. [Kaiser Engineers California Corp., Oakland, CA (United States)

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B&S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs.

  18. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Russell, E.W.; Clarke, W.; Domian, H.A.; Madson, A.A.

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B ampersand S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs

  19. Savage Island Project borehole completion report

    International Nuclear Information System (INIS)

    Chamness, M.A.; Gilmore, T.J.; Teel, S.S.

    1993-02-01

    This report discusses three wells which were drilled in 1990 and 1991 in support of Pacific Northwest Laboratory's Ground-Water surveillance Project. These wells were intended to monitor the Rattlesnake Ridge interbed aquifer and the deeper portion of the unconfined aquifer to determine whether ground-water contamination emanating from the Hanford Site was migrating offsite through these aquifers. This report discusses well construction, lithologies encountered, and other data collected during drilling. At least three reports have been or are being prepared to discuss the results of this well monitoring project

  20. Report of the ANS Project Feasibility Workshop for a High Flux Isotope Reactor-Center for Neutron Research Facility

    International Nuclear Information System (INIS)

    Peretz, F.J.; Booth, R.S.

    1995-07-01

    The Advanced Neutron Source (ANS) Conceptual Design Report (CDR) and its subsequent updates provided definitive design, cost, and schedule estimates for the entire ANS Project. A recent update to this estimate of the total project cost for this facility was $2.9 billion, as specified in the FY 1996 Congressional data sheet, reflecting a line-item start in FY 1995. In December 1994, ANS management decided to prepare a significantly lower-cost option for a research facility based on ANS which could be considered during FY 1997 budget deliberations if DOE or Congressional planners wished. A cost reduction for ANS of about $1 billion was desired for this new option. It was decided that such a cost reduction could be achieved only by a significant reduction in the ANS research scope and by maximum, cost-effective use of existing High Flux Isotope Reactor (HFIR) and ORNL facilities to minimize the need for new buildings. However, two central missions of the ANS -- neutron scattering research and isotope production-were to be retained. The title selected for this new option was High Flux Isotope Reactor-Center for Neutron Research (HFIR-CNR) because of the project's maximum use of existing HFIR facilities and retention of selected, central ANS missions. Assuming this shared-facility requirement would necessitate construction work near HFIR, it was specified that HFIR-CNR construction should not disrupt normal operation of HFIR. Additional objectives of the study were that it be highly credible and that any material that might be needed for US Department of Energy (DOE) and Congressional deliberations be produced quickly using minimum project resources. This requirement made it necessary to rely heavily on the ANS design, cost, and schedule baselines. A workshop methodology was selected because assessment of each cost and/or scope-reduction idea required nearly continuous communication among project personnel to ensure that all ramifications of propsed changes

  1. A conceptual framework for the evaluation of cost-effectiveness of projects to reduce GHG emissions and sequester carbon

    International Nuclear Information System (INIS)

    Sathaye, J.; Norgaard, R.; Makundi, W.

    1993-07-01

    This paper proposes a conceptual framework for evaluating the cost of projects to reduce atmospheric greenhouse gases (GHGs). The evaluation of cost-effectiveness should account for both the timing of carbon emissions and the damage caused by the atmospheric stock of carbon. We develop a conceptual basis to estimate the cost-effectiveness of projects in terms of the cost of reducing atmospheric carbon (CRAC) and other GHGs. CRAC accounts for the economic discount rate, alternative functional forms of the shadow price, the residence period of carbon in the atmosphere, and the multiple monetary benefits of projects. The last item is of particular importance to the developing countries

  2. Frequent Change Request From User to Handle Cost on Project in Agile Model

    Directory of Open Access Journals (Sweden)

    Shariq Aziz Butt

    2017-05-01

    Full Text Available Agile has invented to improve and overcome Draw backs of software development. Now agile model is using in software development very vastly. It is facilitating the developer and client both very resourcefully. It is getting popularity than the other Software Development Life Cycle models because of its characteristics and most owing to allow change request at any level of the project. The client in the software development is the main part and asset of the company. The software house always focuses on its client because client is an asset. Thus developer has major concern with the client’s requirement and change request. Agile is getting popularity because of allow change request at any stage of project, on the other hand it is also a drawback in agile model because when project starts the project’s completion time and cost is decided. But due to frequent change of requests come from client the cost and completion time both increase eventually which is not good for software house’s business and reputation. So there is need a cost and time estimation technique to solve change request issue in agile model.

  3. Cost-benefit of the telecardiology service in the state of Minas Gerais: Minas Telecardio Project.

    Science.gov (United States)

    Andrade, Mônica Viegas; Maia, Ana Carolina; Cardoso, Clareci Silva; Alkmim, Maria Beatriz; Ribeiro, Antônio Luiz Pinho

    2011-10-01

    Telecardiology is a tool that can aid in cardiovascular care, mainly in towns located in remote areas. However, economic assessments on this subject are scarce and have yielded controversial results. To evaluate the cost-benefit of implementing a Telecardiology service in remote, small towns in the state of Minas Gerais, Brazil. The study used the database from the Minas Telecardio (MTC) Project, developed from June 2006 to November 2008, in 82 towns in the countryside of the state. Each municipality received a microcomputer with a digital electrocardiograph, with the possibility of transmitting ECG tracings and communicating with the on-duty cardiologist at the University hospital. The cost-benefit analysis was carried out by comparing the cost of performing an ECG in the project versus the cost of performing it by patient referral to another city. The average cost of an ECG in the MTC project was R$ 28.92, decomposed into R$ 8.08 for the cost of implementation and R$ 20.84 for maintenance. The cost simulation of the ECG with referral ranged from R$ 30.91 to R$ 54.58, with the cost-benefit ratio being always favorable to the MTC program, regardless of the type of calculation used for referral distance. The simulations considered the financial sponsor's and society's points-of-view. The sensitivity analysis with variation of calibration parameters confirmed these results. The implementation of a Telecardiology system as support to primary care in small Brazilian towns is feasible and economically beneficial, and can be used as a regular program within the Brazilian public health system.

  4. Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, F.E.

    1995-08-01

    The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

  5. The status of nuclear industry Cost Beneficial Licensing Actions (CBLA) activities. Final report

    International Nuclear Information System (INIS)

    Ross, A.M.; Sokolsky, D.

    1995-05-01

    The project addressed in this report investigated the status of nuclear utility industry Cost Beneficial Licensing Action (CBLA) and Commitment Reduction (CR) activities. The CBLA program was a recent NRC initiative to enable utilities to revise regulatory commitments that have minimal safety impact and have but have been costly to implement. The project determined that approximately half of the utilities in the industry have formal programs to address this issue and that the programs implemented to date have had mixed results: some utilities benefited greatly and others only achieved minimal rewards. The project also determined that there are some significant factors that impact the potential for success of such programs. These factors include the level of management involvement and support, the level of resources dedicated to CBLA/CR activities, and the willingness of the utility to pursue issues that previously had not been considered. In addition, the overall success of the industry efforts will be highly dependent upon the effectiveness of the respective assigned NRR Project Manager, NRC's newly formed CBLA Task Group, and the NRC's ability to effect a mechanism to provide real value added for those submittals made to the Commission that are designated as CBLA submittals. It is anticipated that the next 12 months will be critical to the success or failure of industry CBLA/CR efforts as the industry begins to use an NEI process designed to facilitate the evaluation of CBLA/CR issues and the NRC CBLA Task Group begins to function in a routine manner

  6. How many Enrons? Mark-ups in the stated capital cost of independent power producers' (IPPs') power projects in developing countries

    International Nuclear Information System (INIS)

    Phadke, Amol

    2009-01-01

    I analyze the determinants of the stated capital cost of IPPs' power projects which significantly influences their price of power. I show that IPPs face a strong incentive to overstate their capital cost and argue that effective competition or regulatory scrutiny will limit the extent of the same. I analyze the stated capital costs of combined cycle gas turbine (CCGT) IPP projects in eight developing countries which became operational during 1990-2006 and find that the stated capital cost of projects selected without competitive bidding is 44-56% higher than those selected with competitive bidding, even after controlling for the effect of cost differences among projects. The extent to which the stated capital costs of projects selected without competitive bidding are higher compared those selected with competitive bidding, is a lower bound on the extent to which they are overstated. My results indicate the drawbacks associated with a policy of promoting private sector participation without an adequate focus on improving competition or regulation. (author)

  7. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities

    International Nuclear Information System (INIS)

    Benjamin, Serge; Descures, Sylvain; Du Pasquier, Louis; Francois, Patrice; Buonarotti, Stefano; Mariotti, Giovanni; Tarakonov, Jurij; Daniska, Vladimir; Bergh, Niklas; Carroll, Simon; AaSTRoeM, Annika; Cato, Anna; De La Gardie, Fredrik; Haenggi, Hannes; Rodriguez, Jose; Laird, Alastair; Ridpath, Andy; La Guardia, Thomas; O'Sullivan, Patrick; ); Weber, Inge; )

    2017-01-01

    The cost estimation process of decommissioning nuclear facilities has continued to evolve in recent years, with a general trend towards demonstrating greater levels of detail in the estimate and more explicit consideration of uncertainties, the latter of which may have an impact on decommissioning project costs. The 2012 report on the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, a joint recommendation by the Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission, proposes a standardised structure of cost items for decommissioning projects that can be used either directly for the production of cost estimates or for mapping of cost items for benchmarking purposes. The ISDC, however, provides only limited guidance on the treatment of uncertainty when preparing cost estimates. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, prepared jointly by the NEA and IAEA, is intended to complement the ISDC, assisting cost estimators and reviewers in systematically addressing uncertainties in decommissioning cost estimates. Based on experiences gained in participating countries and projects, the report describes how uncertainty and risks can be analysed and incorporated in decommissioning cost estimates, while presenting the outcomes in a transparent manner

  8. Good research practices for measuring drug costs in cost-effectiveness analyses: a societal perspective: the ISPOR Drug Cost Task Force report--Part II.

    Science.gov (United States)

    Garrison, Louis P; Mansley, Edward C; Abbott, Thomas A; Bresnahan, Brian W; Hay, Joel W; Smeeding, James

    2010-01-01

    Major guidelines regarding the application of cost-effectiveness analysis (CEA) have recommended the common and widespread use of the "societal perspective" for purposes of consistency and comparability. The objective of this Task Force subgroup report (one of six reports from the International Society for Pharmacoeconomics and Outcomes Research [ISPOR] Task Force on Good Research Practices-Use of Drug Costs for Cost Effectiveness Analysis [Drug Cost Task Force (DCTF)]) was to review the definition of this perspective, assess its specific application in measuring drug costs, identify any limitations in theory or practice, and make recommendations regarding potential improvements. Key articles, books, and reports in the methodological literature were reviewed, summarized, and integrated into a draft review and report. This draft report was posted for review and comment by ISPOR membership. Numerous comments and suggestions were received, and the report was revised in response to them. The societal perspective can be defined by three conditions: 1) the inclusion of time costs, 2) the use of opportunity costs, and 3) the use of community preferences. In practice, very few, if any, published CEAs have met all of these conditions, though many claim to have taken a societal perspective. Branded drug costs have typically used actual acquisition cost rather than the much lower social opportunity costs that would reflect only short-run manufacturing and distribution costs. This practice is understandable, pragmatic, and useful to current decision-makers. Nevertheless, this use of CEA focuses on static rather than dynamic efficacy and overlooks the related incentives for innovation. Our key recommendation is that current CEA practice acknowledge and embrace this limitation by adopting a new standard for the reference case as one of a "limited societal" or "health systems" perspective, using acquisition drug prices while including indirect costs and community preferences. The

  9. Bottom-up comparisons of CO2 storage and costs in forestry and biomass energy projects

    International Nuclear Information System (INIS)

    Swisher, J.N.

    1993-01-01

    In order to include forestry and biomass energy projects in a possible CO 2 emission reduction regime, and to compare the costs of individual projects or national programs, it is necessary to determine the rate of equivalency between carbon in fossil fuel emissions and carbon stored in different types of forestry, biomass and renewable energy projects. This paper presents a comprehensive and consistent methodology to account for the costs and carbon flows of different categories of forestry and biomass energy projects and describes the application of the methodology to several sets of projects in Latin America. The results suggest that both biomass energy development and forestry measures including reforestation and forest protection can contribute significantly to the reduction of global CO 2 emissions, and that local land-use capacity must determine the type of project that is appropriate in specific cases. No single approach alone is sufficient as either a national or global strategy for sustainable land use or carbon emission reduction

  10. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  11. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  12. Technology Cost and Schedule Estimation (TCASE) Final Report

    Science.gov (United States)

    Wallace, Jon; Schaffer, Mark

    2015-01-01

    During the 2014-2015 project year, the focus of the TCASE project has shifted from collection of historical data from many sources to securing a data pipeline between TCASE and NASA's widely used TechPort system. TCASE v1.0 implements a data import solution that was achievable within the project scope, while still providing the basis for a long-term ability to keep TCASE in sync with TechPort. Conclusion: TCASE data quantity is adequate and the established data pipeline will enable future growth. Data quality is now highly dependent the quality of data in TechPort. Recommendation: Technology development organizations within NASA should continue to work closely with project/program data tracking and archiving efforts (e.g. TechPort) to ensure that the right data is being captured at the appropriate quality level. TCASE would greatly benefit, for example, if project cost/budget information was included in TechPort in the future.

  13. Estimating Total Program Cost of a Long-Term, High-Technology, High-Risk Project with Task Durations and Costs That May Increase Over Time

    National Research Council Canada - National Science Library

    Brown, Gerald G; Grose, Roger T; Koyak, Robert A

    2006-01-01

    .... Each task suffers some risk of delay and changed cost. Ignoring budget constraints, we use Monte Carlo simulation of the duration of each task in the project to infer the probability distribution of the project completion time...

  14. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    Energy Technology Data Exchange (ETDEWEB)

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  15. The Stripa project. Annual report 1990

    International Nuclear Information System (INIS)

    1991-07-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The research and development division of the Swedish Nuclear Fuel and Waste Management Co. (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1990

  16. The Stripa project annual report 1991

    International Nuclear Information System (INIS)

    1992-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1991

  17. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  18. Alternate bidding strategies for asphalt and concrete pavement projects utilizing life cycle cost analysis (LCCA).

    Science.gov (United States)

    2012-07-01

    Recent changes in pavement materials costs have impacted the competitive environment relative to the : determination of the most cost effective pavement structure for a specific highway project. In response, State : highway agencies have renewed thei...

  19. Status Report: Mathematics Curriculum-Development Projects Today

    Science.gov (United States)

    Arithmetic Teacher, 1972

    1972-01-01

    Brief reports on the Cambridge Conference on School Mathematics, Comprehensive School Mathematics Program, Computer-Assisted Instruction Projects at Stanford, Individually Prescribed Instruction Project, The Madison Project, Mathematics/Science Learning System, MINNEMAST, and School Mathematics Study Group. (MM)

  20. Cost to serve : zooming in customer profitability at Nike

    NARCIS (Netherlands)

    Martelli, Maria Eugenia

    2008-01-01

    This report presents the outcome of the Logistics Design Project carried out for Nike Inc. The goal of this project is to design a cost model that provides visibility on the profitability of each relevant segment of the matrix, by establishing the cost correlation between products, processes,

  1. Electricity transmission congestion costs: A review of recent reports

    Energy Technology Data Exchange (ETDEWEB)

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-10-01

    Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

  2. Projected hydrogen cost from methane reforming for North America 2015-2050

    International Nuclear Information System (INIS)

    Vanderveen, K.; Lutz, A.; Klebanoff, L.; Drennen, T.; Keller, J.; Drennen, T.; Kamery, W.

    2006-01-01

    The Hydrogen Futures Simulation Model (H 2 Sim) was used to project the cost for hydrogen at the point of sale to light duty vehicles for distributed, small-scale steam methane reforming. Projections cover the period from 2010-2050 in North America, and take into account assumptions about the quantity of recoverable natural gas remaining in North America. We conclude that there is a window for distributed reforming to play a positive role in supplying a H 2 fuel infrastructure, but this window is closing rapidly. The analysis assumes that production from natural gas reserves in North America will peak sometime before 2050 and demand will cause the price to rise after the peak of production in a manner consistent with Hotelling's model. We consider three scenarios for when the peak occurs, and evaluate the impact on the cost of hydrogen fuel produced via distributed small scale reforming in these three scenarios. (authors)

  3. Nuclear power costs

    International Nuclear Information System (INIS)

    1963-01-01

    A report prepared by the IAEA Secretariat and presented to the seventh session of the Agency's General Conference says that information on nuclear power costs is now rapidly moving from the domain of uncertain estimates to that of tested factual data. As more and more nuclear power stations are being built and put into operation, more information on the actual costs incurred is becoming available. This is the fourth report on nuclear power costs to be submitted to the IAEA General Conference. The report last year gave cost information on 38 nuclear power projects, 17 of which have already gone into operation. Certain significant changes in the data given last year are included-in the present report; besides, information is given on seven new plants. The report is divided into two parts, the first on recent developments and current trends in nuclear power costs and the second on the use of the cost data for economic comparisons. Both stress the fact that the margin of uncertainty in the basic data has lately been drastically reduced. At the same time, it is pointed out, some degree of uncertainty is inherent in the assumptions made in arriving at over-all generating cost figures, especially when - as is usually the case - a nuclear plant is part of an integrated power system

  4. Solar Avoided Cost Solution SunShot 6 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, John [Genability, San Francisco, CA (United States); Danziger, Eric [Genability, San Francisco, CA (United States)

    2014-01-29

    The core objectives of this project were two separate but integrated products, collectively providing game-changing Avoided Cost capabilities. The first was a kit of avoided cost tools and data that any solar provider can use a-lacarte or as a whole. It’s open and easily accessible nature allows the rapid and accurate calculation of avoided cost in whatever context and software that make sense (“Typical and Avoided Cost Tools”). This kit includes a dataset of typical energy rates, costs and usage that can be used for solar prospecting, lead generation and any situation where data about an opportunity is missing or imperfect. The second is a web application and related APIs specifically built for solar providers to radically streamline their lead-to-sale process (“Solar Provider Module”). The typical and Avoided Cost tools are built directly into this, and allow for solar providers to track their opportunities, collaborate with their installers and financiers, and close more sales faster.

  5. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  6. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  7. New benchmarks for costs and cost-efficiency of school-based feeding programs in food-insecure areas.

    Science.gov (United States)

    Gelli, Aulo; Cavallero, Andrea; Minervini, Licia; Mirabile, Mariana; Molinas, Luca; de la Mothe, Marc Regnault

    2011-12-01

    School feeding is a popular intervention that has been used to support the education, health and nutrition of school children. Although the benefits of school feeding are well documented, the evidence on the costs of such programs is remarkably thin. Address the need for systematic estimates of the cost of different school feeding modalities, and of the determinants of the considerable cost variation among countries. WFP project data, including expenditures and number of schoolchildren covered, were collected for 78 projects in 62 countries through project reports and validated through WFP Country Office records. Yearly project costs per schoolchild were standardized over a set number of feeding days and the amount of energy provided by the average ration. Output metrics, such as tonnage, calories, and micronutrient content, were used to assess the cost-efficiency of the different delivery mechanisms. The standardized yearly average school feeding cost per child, not including school-level costs, was US$48. The yearly costs per child were lowest at US$23 for biscuit programs reaching school-going children and highest at US$75 for take-home rations programs reaching families of schoolgoing children. The average cost of programs combining on-site meals with extra take-home rations for children from vulnerable households was US$61. Commodity costs were on average 58% of total costs and were highest for biscuit and take-home rations programs (71% and 68%, respectively). Fortified biscuits provided the most cost-efficient option in terms of micronutrient delivery, whereas take-home rations were more cost-efficient in terms of food quantities delivered. Both costs and effects should be considered carefully when designing school feeding interventions. The average costs of school feeding estimated here are higher than those found in earlier studies but fall within the range of costs previously reported. Because this analysis does not include school-level costs, these

  8. Cost estimation of thermal and nuclear power using annual securities report

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Nagatomi, Yu; Murakami, Tomoko

    2011-01-01

    Cost estimation of generation cost derived from various power sources was widely conducted using model plant or annual securities report of electric utilities. Although annual securities report method was subjected to some limitation in methodology itself, useful information was obtained for cost comparison of thermal and nuclear power. Studies on generation cost evaluation of thermal and nuclear power based on this method during past five years showed that nuclear power cost was almost stable 7 Yen/kWh and thermal power cost was varying 9 - 12 Yen/kWh dependent on violent fluctuations of primary energy cost. Nuclear power was expected cost increase due to enhanced safety requirements or damage compensation of accidents as well as decommissioning and back-end cost, which were difficult to evaluate accurately with annual securities report. Further comprehensive and accurate cost estimation should be encouraged including these items. (T. Tanaka)

  9. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  10. Evaluation of directional vacuum-assisted breast biopsy: Report for the National Breast Cancer Centre final report, CHERE Project Report No 21

    OpenAIRE

    Marion Haas; Lorraine Ivancic

    2003-01-01

    This project was commissioned by the National Breast Cancer Centre (NBCC). The objectives of the project, as set out in the call for expressions of interest, were to determine: 1. The costs associated with the introduction and use of directional vacuum-assisted breast biopsy(DVA breast biopsy) in Australia; and 2. Whether directional vacuum-assisted breast biopsy used for diagnostic purposes is cost-effectivein Australia when compared to core biopsy. The motivation for commissioning the proje...

  11. Development of TRU transmuters for optimization of the global fuel cycle. Final Report for the NERI Project

    International Nuclear Information System (INIS)

    Lee, John C.

    2009-01-01

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report

  12. The Stripa project. Annual report 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) hsa been enstrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1988. (36 figs., 4 tabs.)

  13. 2015 Cost of Wind Energy Review

    Energy Technology Data Exchange (ETDEWEB)

    Mone, Christopher; Hand, Maureen; Bolinger, Mark; Rand, Joseph; Heimiller, Donna; Ho, Jonathan

    2017-04-05

    This report uses representative commercial projects to estimate the levelized cost of energy (LCOE) for both land-based and offshore wind plants in the United States for 2015. Scheduled to be published on an annual basis, the analysis relies on both market and modeled data to maintain an up-to-date understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed by the National Renewable Energy Laboratory (NREL) are used in this analysis to inform wind technology cost projections, goals, and improvement opportunities.

  14. 2014 Cost of Wind Energy Review

    Energy Technology Data Exchange (ETDEWEB)

    Mone, Christopher [National Renewable Energy Lab. (NREL), Golden, CO (United States); Stehly, Tyler [National Renewable Energy Lab. (NREL), Golden, CO (United States); Maples, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Settle, Edward [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-10-01

    This report uses representative commercial projects to estimate the levelized cost of energy (LCOE) for both land-based and offshore wind plants in the United States for 2014. Scheduled to be published on an annual basis, the analysis relies on both market and modeled data to maintain an up-to-date understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed by the National Renewable Energy Laboratory (NREL) are used in this analysis to inform wind technology cost projections, goals, and improvement opportunities.

  15. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  16. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  17. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  18. Prototype Rail Crossing Violation Warning Application Project Report.

    Science.gov (United States)

    2017-09-05

    This report is the Project Report for the Rail Crossing Violation Warning (RCVW) safety application developed for the project on Rail Crossing Violation Warning Application and Infrastructure Connection, providing a means for equipped connected vehic...

  19. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  20. Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor That Produces Low Cost Electricty - FY-02 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Mac Donald, Philip Elsworth; Buongiorno, Jacopo

    2002-10-01

    The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A. This is the third in a series of Annual Reports for this project, the others are also listed in Appendix A as FY-00 and FY-01 Annual Reports.

  1. Advanced conceptual design report solid waste retrieval facility, phase I, project W-113

    International Nuclear Information System (INIS)

    Smith, K.E.

    1994-01-01

    Project W-113 will provide the equipment and facilities necessary to retrieve suspect transuranic (TRU) waste from Trench 04 of the 218W-4C burial ground. As part of the retrieval process, waste drums will be assayed, overpacked, vented, head-gas sampled, and x-rayed prior to shipment to the Phase V storage facility in preparation for receipt at the Waste Receiving and Processing Facility (WRAP). Advanced Conceptual Design (ACD) studies focused on project items warranting further definition prior to Title I design and areas where the potential for cost savings existed. This ACD Report documents the studies performed during FY93 to optimize the equipment and facilities provided in relation to other SWOC facilities and to provide additional design information for Definitive Design

  2. Carbon accounting and cost estimation in forestry projects using CO2Fix V.3

    NARCIS (Netherlands)

    Groen, T.A.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by

  3. Nuclear energy: the real cost. A special report

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, K.; Marshall, R.; Sweet, C.; Prior, M.; Welsh, I.; Bunyard, P.; Goldsmith, E.; Hildyard, N.; Jeffery, J.W. (Committee for the Study of the Economics of Nuclear Electricity, Camelford (UK))

    1981-12-01

    This report on the discussions within a small group of academics falls under the headings: chairman's foreword; summary and recommendations; the government's nuclear power programme and its implications; the CEGB's planning record; the past performance of Britain's nuclear power stations - a guide for the future (query); nuclear power -early uncertainties; historic costs - 'the fraud inherent in all inflationary finance'; current cost accounting; fuel costs - coal stays steady, nuclear rises; net effective cost and the rationale for nuclear power; reinterpreting net effective costs; other considerations; conclusions and recommendations; references.

  4. The cost and feasibility of marine coastal restoration.

    Science.gov (United States)

    Bayraktarov, Elisa; Saunders, Megan I; Abdullah, Sabah; Mills, Morena; Beher, Jutta; Possingham, Hugh P; Mumby, Peter J; Lovelock, Catherine E

    2016-06-01

    Land-use change in the coastal zone has led to worldwide degradation of marine coastal ecosystems and a loss of the goods and services they provide. Restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed and is critical for habitats where natural recovery is hindered. Uncertainties about restoration cost and feasibility can impede decisions on whether, what, how, where, and how much to restore. Here, we perform a synthesis of 235 studies with 954 observations from restoration or rehabilitation projects of coral reefs, seagrass, mangroves, salt-marshes, and oyster reefs worldwide, and evaluate cost, survival of restored organisms, project duration, area, and techniques applied. Findings showed that while the median and average reported costs for restoration of one hectare of marine coastal habitat were around US$80000 (2010) and US$1600000 (2010), respectively, the real total costs (median) are likely to be two to four times higher. Coral reefs and seagrass were among the most expensive ecosystems to restore. Mangrove restoration projects were typically the largest and the least expensive per hectare. Most marine coastal restoration projects were conducted in Australia, Europe, and USA, while total restoration costs were significantly (up to 30 times) cheaper in countries with developing economies. Community- or volunteer-based marine restoration projects usually have lower costs. Median survival of restored marine and coastal organisms, often assessed only within the first one to two years after restoration, was highest for saltmarshes (64.8%) and coral reefs (64.5%) and lowest for seagrass (38.0%). However, success rates reported in the scientific literature could be biased towards publishing successes rather than failures. The majority of restoration projects were short-lived and seldom reported monitoring costs. Restoration success depended primarily on the ecosystem, site selection, and techniques

  5. Photovoltaic Programme Edition 2007. Summary Report, Project List, Annual Project Reports 2006 (Abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This 2007 edition summary report for the Swiss Federal Office of Energy (SFOE), reports on the work done within the framework of the Swiss Photovoltaics Program in 2006. The document contains 46 abstracts on work done in the photovoltaics area. The subjects reported on in the thin-film photovoltaics sector include advanced processing and characterisation of thin film silicon solar cells, high-rate deposition of micro-crystalline silicon, a new large-area VHF reactor for high-rate deposition of micro-crystalline silicon, the stability of zinc oxide in encapsulated thin film silicon solar cells, spectral photocurrent measurement, roll-to-roll technology for the production of thin film silicon modules, advanced thin film technologies, ultra thin silicon wafer cutting, bifacial thin industrial multi-crystalline silicon solar cells, flexible CIGS solar cells and mini-modules, large-area CIS-based thin-film solar modules and advanced thin-film technologies. In the area of dye-sensitised modules, the following projects are reported on: Dye-sensitised nano-crystalline solar cells, voltage enhancement of dye solar cells and molecular orientation as well as low band-gap and new hybrid device concepts for the improvement of flexible organic solar cells. Other projects reported on include a new PV wave making more efficient use of the solar spectrum, photovoltaic textiles, organic photovoltaic devices, photo-electrochemical and photovoltaic conversion and storage of solar energy, PV modules with antireflex glass, improved integration of PV into existing buildings, the seventh program at the LEEE-TISO, the 'PV enlargement' and 'Performance' programs, efficiency and annual electricity production of PV modules, photovoltaics system technology 2005-2006, an update on photovoltaics in view of the 'ecoinvent' v.2.0 tool and environmental information services for solar energy industries. The contributions to four Swiss IEA PVPS tasks and the Swiss

  6. Photovoltaic Programme Edition 2007. Summary Report, Project List, Annual Project Reports 2006 (Abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This 2007 edition summary report for the Swiss Federal Office of Energy (SFOE), reports on the work done within the framework of the Swiss Photovoltaics Program in 2006. The document contains 46 abstracts on work done in the photovoltaics area. The subjects reported on in the thin-film photovoltaics sector include advanced processing and characterisation of thin film silicon solar cells, high-rate deposition of micro-crystalline silicon, a new large-area VHF reactor for high-rate deposition of micro-crystalline silicon, the stability of zinc oxide in encapsulated thin film silicon solar cells, spectral photocurrent measurement, roll-to-roll technology for the production of thin film silicon modules, advanced thin film technologies, ultra thin silicon wafer cutting, bifacial thin industrial multi-crystalline silicon solar cells, flexible CIGS solar cells and mini-modules, large-area CIS-based thin-film solar modules and advanced thin-film technologies. In the area of dye-sensitised modules, the following projects are reported on: Dye-sensitised nano-crystalline solar cells, voltage enhancement of dye solar cells and molecular orientation as well as low band-gap and new hybrid device concepts for the improvement of flexible organic solar cells. Other projects reported on include a new PV wave making more efficient use of the solar spectrum, photovoltaic textiles, organic photovoltaic devices, photo-electrochemical and photovoltaic conversion and storage of solar energy, PV modules with antireflex glass, improved integration of PV into existing buildings, the seventh program at the LEEE-TISO, the 'PV enlargement' and 'Performance' programs, efficiency and annual electricity production of PV modules, photovoltaics system technology 2005-2006, an update on photovoltaics in view of the 'ecoinvent' v.2.0 tool and environmental information services for solar energy industries. The contributions to four Swiss IEA PVPS tasks and the Swiss interdepartmental platform for

  7. 76 FR 39474 - Monthly Median Cost of Funds Reporting, and Publication of Cost of Funds Indices

    Science.gov (United States)

    2011-07-06

    ... Semiannual Cost of Funds Index (SCOF), and other related cost of funds ratios currently published monthly in... discussed in this notice, please contact Jim Caton, Managing Director--Economic and Industry Analysis, at... Thrift Financial Report (TFR): \\2\\ \\2\\ Copies of the reporting forms and instructions for the TFR (OMB No...

  8. Budget Period 2 Summary Report Part 3: Hywind Maine Project

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Frederick [Statoil Wind US LLC, Washington, DC (United States); Platt, Andrew [Statoil Wind US LLC, Washington, DC (United States); Sirnivas, Senu [Statoil Wind US LLC, Washington, DC (United States)

    2015-08-15

    This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data

  9. Final Project Report for Award ER65581

    Energy Technology Data Exchange (ETDEWEB)

    Stoy, Paul C. [Montana State Univ., Bozeman, MT (United States)

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  10. Reactor vessel decommissioning project. Final report

    International Nuclear Information System (INIS)

    Schoonen, D.H.

    1984-09-01

    This report describes a reactor vessel decommissioning project; it documents and explains the project objectives, scope, performance results, and sodium removal process. The project was successfully completed in FY-1983, within budget and without significant problems or adverse impact on the environment. Waste generated by the operation included the reactor vessel, drained sodium, and liquid, solid, and gaseous wastes which were significantly less than project estimates. Personnel radiation exposures were minimized, such that the project total was one-half the predicted exposure level. Except for the sodium removed, the material remaining in the reactor vessel is essentially the same as when the vessel arrived for processing

  11. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  12. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; David Duncan; Joan Connolly; Margaret Hinman; Charles Marcinkiewicz; Gary Mecham

    2011-03-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  13. Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

    CERN Document Server

    Lebrun, Philippe

    2010-01-01

    High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

  14. Benefits and Economic Costs of Managed Aquifer Recharge in California

    Directory of Open Access Journals (Sweden)

    Debra Perrone

    2016-07-01

    Full Text Available doi: http://dx.doi.org/10.15447/sfews.2016v14iss2art4Groundwater management is important and challenging, and nowhere is this more evident than in California. Managed aquifer recharge (MAR projects can play an important role in ensuring California manages its groundwater sustainably. Although the benefits and economic costs of surface water storage have been researched extensively, the benefits and economic costs of MAR have been little researched. Historical groundwater data are sparse or proprietary within the state, often impairing groundwater analyses. General obligation bonds from ballot propositions offer a strategic means of mining information about MAR projects, because the information is available publicly. We used bond-funding applications to identify anticipated MAR project benefits and proposed economic costs. We then compared these costs with actual project costs collected from a survey, and identified factors that promote or limit MAR. Our analysis indicates that the median proposed economic cost for MAR projects in California is $410 per acre-foot per year ($0.33 per cubic meter per year. Increasing Water Supply, Conjunctive Use, and Flood Protection are the most common benefits reported. Additionally, the survey indicates that (1 there are many reported reasons for differences between proposed and actual costs ($US 2015 and (2 there is one primary reason for differences between proposed recharge volumes and actual recharge volumes (AFY: availability of source water for recharge. Although there are differences between proposed and actual costs per recharge volume ($US 2015/AFY, the ranges for proposed costs per recharge volume and actual costs per recharge volume for the projects surveyed generally agree. The two most important contributions to the success of a MAR project are financial support and good communication with stakeholders.

  15. Past and Future Cost of Wind Energy: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Hand, M.; Wiser, R.

    2012-08-01

    The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions.

  16. Cost-Benefit Study of a Project to Lower Cost and Improve Fleet Readiness through Integrating the Management of Technical Information

    OpenAIRE

    Levine, Dan

    2010-01-01

    Proceedings Paper (for Acquisition Research Program) Approved for public release; distribution unlimited. This paper describes a cost-benefit analysis by the Institute for Defense Analyses of the ''Bridge Project'' that ADL (Advanced Distributed Learning) is conducting for the Office of Secretary of Defense for Acquisition, Technology and Logistics (OSD(AT&L) to improve the management of Integrated Logistics Support (ILS). The Project is part of the OSD RTOC program (Reduction in Total ...

  17. Social opportunity cost of capital: empirical estimates

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, S.

    1978-02-01

    This report develops estimates of the social-opportunity cost of public capital. The private and social costs of capital are found to diverge primarily because of the effects of corporate and personal income taxes. Following Harberger, the social-opportunity cost of capital is approximated by a weighted average of the returns to different classes of savers and investors where the weights are the flows of savings or investments in each class multiplied by the relevant elasticity. Estimates of these parameters are obtained and the social-opportunity cost of capital is determined to be in the range of 6.2 to 10.8%, depending upon the parameter values used. Uncertainty is found to affect the social-opportunity cost of capital in two ways. First, some allowance must be made for the chance of failure or at least of not realizing claims of a project's proponents. Second, a particular government project will change the expected variability of the returns to the government's entire portfolio of projects. In the absence of specific information about each project, the use of the economy-wide average default and risk adjustments is suggested. These are included in the empirical estimates reported. International capital markets make available private capital, the price of which is not distorted by the U.S. tax system. The inclusion of foreign sources slightly reduces the social-opportunity cost of capital. 21 references.

  18. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  19. National Writing Project. 2011-2012 Report

    Science.gov (United States)

    National Writing Project (NJ1), 2012

    2012-01-01

    This National Writing Project 2011-2012 Report describes how Writing Project teacher-leaders study and share effective practices that enhance student writing and learning, work collaboratively with other educators, design resources, and take on new roles in effecting positive change. It includes a financial summary for years ended September 30 for…

  20. Computerized management report system for monitoring manpower and cost

    International Nuclear Information System (INIS)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures

  1. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  2. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  3. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    Energy Technology Data Exchange (ETDEWEB)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  4. Opportunities for low-cost CO2 storage demonstration projects in China

    International Nuclear Information System (INIS)

    Meng, Kyle C.; Williams, Robert H.; Celia, Michael A.

    2007-01-01

    Several CO 2 storage demonstration projects are needed in a variety of geological formations worldwide to prove the viability of CO 2 capture and storage as a major option for climate change mitigation. China has several low-cost CO 2 sources at sites that produce NH 3 from coal via gasification. At these plants, CO 2 generated in excess of the amount needed for other purposes (e.g., urea synthesis) is vented as a relatively pure stream. These CO 2 sources would potentially be economically interesting candidates for storage demonstration projects if there are suitable storage sites nearby. In this study a survey was conducted to estimate CO 2 availability at modern Chinese coal-fed ammonia plants. Results indicate that annual quantities of available, relatively pure CO 2 per site range from 0.6 to 1.1 million tonnes. The CO 2 source assessment was complemented by analysis of possible nearby opportunities for CO 2 storage. CO 2 sources were mapped in relation to China's petroliferous sedimentary basins where prospective CO 2 storage reservoirs possibly exist. Four promising pairs of sources and sinks were identified. Project costs for storage in deep saline aquifers were estimated for each pairing ranging from $15-21/t of CO 2 . Potential enhanced oil recovery and enhanced coal bed methane recovery opportunities near each prospective source were also considered

  5. Advanced Neutron Source (ANS) Project progress report, FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, J.H.; King-Jones, K.H. [eds.; Selby, D.L.; Harrington, R.M. [Oak Ridge National Lab., TN (United States); Thompson, P.B. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States). Central Engineering Services

    1995-01-01

    The President`s budget request for FY 1994 included a construction project for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the minimum design requirement set by the user community. At the time of this writing, DOE has not established an enrichment level for ANS, but two advisory committees have recommended adopting the new core design, provided the minimum flux requirements are still met.

  6. Advanced Neutron Source (ANS) Project progress report, FY 1994

    International Nuclear Information System (INIS)

    Campbell, J.H.; King-Jones, K.H.; Thompson, P.B.

    1995-01-01

    The President's budget request for FY 1994 included a construction project for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the minimum design requirement set by the user community. At the time of this writing, DOE has not established an enrichment level for ANS, but two advisory committees have recommended adopting the new core design, provided the minimum flux requirements are still met

  7. Final Technical Report: The Water-to-Wire (W2W) Project

    Energy Technology Data Exchange (ETDEWEB)

    Lissner, Daniel N. [Free Flow Power Corporation, Boston, MA (United States); Edward, Lovelace C. [Free Flow Power Corporation, Boston, MA (United States)

    2013-12-24

    The purpose of the Free Flow Power (FFP) Water-to-Wire Project (Project) was to evaluate and optimize the performance, environmental compatibility, and cost factors of FFP hydrokinetic turbines through design analyses and deployments in test flumes and riverine locations.

  8. Cost comparison for REDC pretreatment project

    International Nuclear Information System (INIS)

    Robinson, S.M.; Homan, F.J.

    1997-06-01

    This analysis has been prepared to support the planned expenditure to provide the Radiochemical Engineering Development Center (REDC) with the capability to pretreat their liquid low-level waste (LLLW) before discharging it to the Oak Ridge National Laboratory (ORNL) LLLW system. Pretreatment will remove most of the radioactivity, particularly the transuranic isotopes and Cs-137 from the waste to be discharged. This will render the supernates that accumulate in the storage tanks low-activity Class B low-level wastes rather than high-activity Class B or Class C wastes. The sludges will be Class C rather than remote-handled transuranic (RH-TRU) wastes. When REDC wastes are commingled with other ORNL LLLW, the present-worth treatment and transport costs are higher by a factor of 1.3 for the no-pretreatment cases. This result is consistent with data from similar studies conducted at other sites. Based on the information presented in this analysis, the recommendation is to proceed with REDC treatment projects

  9. Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Boing, L.E.; Aldana, J.

    1997-03-01

    The Final Report for the Decontamination and Decommissioning (D ampersand D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D ampersand D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D ampersand D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D ampersand D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a open-quotes Radiologically Controlled Area,close quotes noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion)

  10. Cost-effectiveness of intensified versus conventional multifactorial intervention in type 2 diabetes: results and projections from the Steno-2 study

    DEFF Research Database (Denmark)

    Gaede, Peter; Valentine, William J; Palmer, Andrew J

    2008-01-01

    and account Danish-specific costs to project life expectancy, quality-adjusted life expectancy (QALE), and lifetime direct medical costs expressed in year 2005 Euros. Clinical and cost outcomes were projected over patient lifetimes and discounted at 3% annually. Sensitivity analyses were performed. RESULTS...... gained. This is considered a conservative estimate because accounting prescription of generic drugs and capturing indirect costs would further favor intensified therapy. CONCLUSIONS: From a health care payer perspective in Denmark, intensive therapy was more cost-effective than conventional treatment...

  11. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and

  12. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  13. Project Elderly. Interim and Final Reports.

    Science.gov (United States)

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  14. Natural gas purchasing for cogeneration projects

    International Nuclear Information System (INIS)

    Kubacki, J. Jr.

    1992-01-01

    This paper reports on the primary cost component for most gas-fired cogeneration or on-site power projects, cost of natural gas. Often gas comprises 50 to 65% of total project costs over the life of the project. Thus it is very important to focus on natural gas sourcing, pricing, transportation and storage. This important task should not be blindly delegated to a gas supplier. The end user must develop a gas strategy that results in the most cost-effective burnertip price. Long-term natural gas supplies are usually source from the three major producing regions: Mod-Continent, Gulf Coast, and Western Canada. A well-reasoned gas strategy must include: determination of transportation and distribution options from the project site to potential gas sources (including direct interconnection of the project to interstate pipelines); acquisition of competitive gas bids from suppliers in appropriate regions; negotiation of potential discounts from interstate pipelines and local distribution companies (LDCs); fine-tuning project economics by, for example, using storage to maximize transportation load factor; and pricing mechanisms that meet economic parameters of the project. This paper uses a hypothetical project in the Midwest to examine the major factors in devising a cost-effective natural gas sourcing

  15. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  16. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  17. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  18. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  19. 2016 Cost of Wind Energy Review

    Energy Technology Data Exchange (ETDEWEB)

    Stehly, Tyler J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Heimiller, Donna M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Scott, George N. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-12-29

    This report uses representative utility-scale projects to estimate the levelized cost of energy (LCOE) for land-based and offshore wind power plants in the United States. Data and results detailed here are derived from 2016 commissioned plants. More specifically, analysis detailed here relies on recent market data and state-of-the-art modeling capabilities to maintain an up-to-date understanding of wind energy cost trends and drivers. This report is intended to provide insight into current component-level costs as well as a basis for understanding variability in LCOE across the country. This publication represents the sixth installment of this annual report.

  20. Economic analysis of geothermal projects

    International Nuclear Information System (INIS)

    Allegrini, G.; Cappetti, G.

    1990-01-01

    This paper reports on the high investment costs typical of geothermal energy which necessitate careful verification of the resource before embarking on a development project. Moreover, they require the adoption of all strategies aimed at limiting investment costs and times as much as possible in order to contain the tie-up of capital in the construction activities. For this purpose a series of choices has been made regarding the constructional standardization of plants and the adoption of organizational criteria that allow cost reduction and better management of the various phases of a development project. A computer program has also been developed which makes it possible to examine the bearing the various parameters relating to the reservoir characteristics have on the cost of the kWh and to optimize resource utilization for the various activities of a development project

  1. Systematic review of model-based analyses reporting the cost-effectiveness and cost-utility of cardiovascular disease management programs.

    Science.gov (United States)

    Maru, Shoko; Byrnes, Joshua; Whitty, Jennifer A; Carrington, Melinda J; Stewart, Simon; Scuffham, Paul A

    2015-02-01

    The reported cost effectiveness of cardiovascular disease management programs (CVD-MPs) is highly variable, potentially leading to different funding decisions. This systematic review evaluates published modeled analyses to compare study methods and quality. Articles were included if an incremental cost-effectiveness ratio (ICER) or cost-utility ratio (ICUR) was reported, it is a multi-component intervention designed to manage or prevent a cardiovascular disease condition, and it addressed all domains specified in the American Heart Association Taxonomy for Disease Management. Nine articles (reporting 10 clinical outcomes) were included. Eight cost-utility and two cost-effectiveness analyses targeted hypertension (n=4), coronary heart disease (n=2), coronary heart disease plus stoke (n=1), heart failure (n=2) and hyperlipidemia (n=1). Study perspectives included the healthcare system (n=5), societal and fund holders (n=1), a third party payer (n=3), or was not explicitly stated (n=1). All analyses were modeled based on interventions of one to two years' duration. Time horizon ranged from two years (n=1), 10 years (n=1) and lifetime (n=8). Model structures included Markov model (n=8), 'decision analytic models' (n=1), or was not explicitly stated (n=1). Considerable variation was observed in clinical and economic assumptions and reporting practices. Of all ICERs/ICURs reported, including those of subgroups (n=16), four were above a US$50,000 acceptability threshold, six were below and six were dominant. The majority of CVD-MPs was reported to have favorable economic outcomes, but 25% were at unacceptably high cost for the outcomes. Use of standardized reporting tools should increase transparency and inform what drives the cost-effectiveness of CVD-MPs. © The European Society of Cardiology 2014.

  2. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  3. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  4. Cost and performance of innovative remediation technologies

    International Nuclear Information System (INIS)

    Cummings, J.B.; Kingscott, J.W.; Fiedler, L.D.

    1995-01-01

    The selection and use of more cost-effective remedies requires better access to data on the performance and cost of technologies used in the field. To make data more widely available, the US Environmental Protection Agency is working jointly with member agencies of the Federal Remediation Technologies Round table to publish case studies of full-scale remediation and demonstration projects. EPA, DoD, and DOE have published case studies of cleanup projects primarily consisting of bioremediation, soil vapor extraction, and thermal desorption. Within the limits of this initial data set, the paper evaluates technology performance and cost. In the analysis of cost factors, the paper shows the use of a standardized Work Breakdown Structure (WBS). Use of the WBS will be important in future reporting of completed projects to facilitate cost comparison. The paper notes the limits to normalization and thus cross-site comparison which can be achieved using the WBS. The paper identifies conclusions from initial efforts to compile cost and performance data, highlights the importance of such efforts to the overall remediation effort, and discusses future cost and performance documentation efforts

  5. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  6. Report to Congress on the U.S. Department of Energy's Environmental Management Science Program. Research funded and its linkages to environmental cleanup problems. High out-year cost environmental management project descriptions. Volume 3 of 3 - Appendix C

    International Nuclear Information System (INIS)

    1998-04-01

    The Department of Energy's Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation's nuclear complex. Appendix C provides details about each of the Department's 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research

  7. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  8. An analysis of energy conservation measure costs

    International Nuclear Information System (INIS)

    Jones, R.; Ellis, R.; Gellineau, D.

    1990-01-01

    This paper reports on a Denver Support Office project to evaluate cost estimation in the Institutional Conservation Program. Unit cost characteristics and cost prediction accuracy were evaluated from 1,721 Energy Conservation Measures (ECMs) and 390 Technical Assistance (TA) reports funded in the last six years. This information is especially useful to state and DOE review engineers in determining the reasonableness of future cost estimates. The estimated cost provisions for TA report grants were generally adequate to cover the actual costs. Individually, there was a tendency for TA reports to cost less than estimated by about 10%. TA report unit costs averaged $.09 to $.11 per square foot, and decreased as the building size increased. Individually, there was a tendency for ECMs to cost more than estimated by about 17%. Overall, the estimated costs of the 1,721 measures were $20.4 minion, while the actual costs were $21.4 million. This 4.6% difference indicates that, overall, ECM cost estimates have provided a reasonable basis for grant awards. There was a high variation in ECM unit costs. The data did not support speculation that there is a tendency to manipulate cost estimates to fit ECMs within the simple payback eligibility criteria of 2 to 10 years

  9. WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY

    Energy Technology Data Exchange (ETDEWEB)

    NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

    2012-03-26

    The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

  10. The role of technology in reducing health care costs. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Sill, A.E.; Warren, S.; Dillinger, J.D.; Cloer, B.K.

    1997-08-01

    Sandia National Laboratories applied a systems approach to identifying innovative biomedical technologies with the potential to reduce U.S. health care delivery costs while maintaining care quality. This study was conducted by implementing both top-down and bottom-up strategies. The top-down approach used prosperity gaming methodology to identify future health care delivery needs. This effort provided roadmaps for the development and integration of technology to meet perceived care delivery requirements. The bottom-up approach identified and ranked interventional therapies employed in existing care delivery systems for a host of health-related conditions. Economic analysis formed the basis for development of care pathway interaction models for two of the most pervasive, chronic disease/disability conditions: coronary artery disease (CAD) and benign prostatic hypertrophy (BPH). Societal cost-benefit relationships based on these analyses were used to evaluate the effect of emerging technology in these treatment areas. 17 figs., 48 tabs.

  11. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  12. Continuum of eLearning: 2012 Project Summary Report

    Science.gov (United States)

    2012-10-01

    multimedia, and Continuum of eLearning | Purpose and Vision 19 << UNCLASSIFIED>> (limited) situated learning. Future versions of the CoL self-paced...Continuum of eLearning : 2012 Project Summary Report Continuum of eLearning The Next Evolution of Joint Training on JKO October 2012 Joint...Technical Report November 2011 – August 2012 Continuum of eLearning : 2012 Project Summary Report N00140-06-D-0060 David T. Fautua, Sae Schatz, Andrea

  13. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  14. Cost-Benefit Analysis of Smart Grids Implementation

    International Nuclear Information System (INIS)

    Tomsic, Z.; Pongrasic, M.

    2014-01-01

    Paper presents guidelines for conducting the cost-benefit analysis of Smart Grid projects connected to the implementation of advanced technologies in electric power system. Restrictions of presented electric power networks are also mentioned along with solutions that are offered by advanced electric power network. From an economic point of view, the main characteristic of advanced electric power network is big investment, and benefits are seen after some time with risk of being smaller than expected. Therefore it is important to make a comprehensive analysis of those projects which consist of economic and qualitative analysis. This report relies on EPRI methodology developed in American institute for energy. The methodology is comprehensive and useful, but also simple and easy to understand. Steps of this methodology and main characteristics of methodologies which refer to EPRI methodology: methodology developed in Joint Research Center and methodologies for analysing implementation of smart meters in electricity power network are explained. Costs, benefits and categories in which they can be classified are also defined. As a part of qualitative analysis, social aspect of Smart Grid projects is described. In cost defining, special attention has to be paid to projects of integrating electricity from variable renewable energy sources into the power system because of additional costs. This work summarized categories of additional costs. In the end of this report, an overview is given of what has been done and what will be done in European Union. (author).

  15. The cost of solar refrigeration: The rococo project; Was solare Kuehlung kostet - das Rococo-Projekt

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, J.P.

    2008-01-21

    The cost of modern solar refrigerators is between 1,300 and 8,000 Euros per kW of refrigeration capacity. The biggest potential for savings is in the peripheral components, as well as in the operating cost and especially in servicing. Cost reduction must have priority if solar refrigeration is to be successful in the market. In the context of the European research project ''Reduction of costs of Solar Cooling systems'' (Rococo), a team of scientists from France, Spain and Austria investigated existing systems. (orig.)

  16. HIV prevention costs and program scale: data from the PANCEA project in five low and middle-income countries

    Directory of Open Access Journals (Sweden)

    Stanley Nicci

    2007-07-01

    Full Text Available Abstract Background Economic theory and limited empirical data suggest that costs per unit of HIV prevention program output (unit costs will initially decrease as small programs expand. Unit costs may then reach a nadir and start to increase if expansion continues beyond the economically optimal size. Information on the relationship between scale and unit costs is critical to project the cost of global HIV prevention efforts and to allocate prevention resources efficiently. Methods The "Prevent AIDS: Network for Cost-Effectiveness Analysis" (PANCEA project collected 2003 and 2004 cost and output data from 206 HIV prevention programs of six types in five countries. The association between scale and efficiency for each intervention type was examined for each country. Our team characterized the direction, shape, and strength of this association by fitting bivariate regression lines to scatter plots of output levels and unit costs. We chose the regression forms with the highest explanatory power (R2. Results Efficiency increased with scale, across all countries and interventions. This association varied within intervention and within country, in terms of the range in scale and efficiency, the best fitting regression form, and the slope of the regression. The fraction of variation in efficiency explained by scale ranged from 26% – 96%. Doubling in scale resulted in reductions in unit costs averaging 34.2% (ranging from 2.4% to 58.0%. Two regression trends, in India, suggested an inflection point beyond which unit costs increased. Conclusion Unit costs decrease with scale across a wide range of service types and volumes. These country and intervention-specific findings can inform projections of the global cost of scaling up HIV prevention efforts.

  17. Nuclear and conventional baseload electricity generation cost experience

    International Nuclear Information System (INIS)

    1993-04-01

    The experienced costs of electricity generation by nuclear and conventional plants and the expected costs of future plants are important for evaluating the economic attractiveness of various power projects and for planning the expansion of electrical generating systems. The main objective of this report is to shed some light on recent cost experience, based on well authenticated information made available by the IAEA Member States participating in this study. Cost information was provided by Canada (Ontario Hydro), Czechoslovakia, Hungary, India, the Republic of Korea and Spain. Reference is also made to information received from Brazil, China, France, Russia and the United States of America. The part of the report that deals with cost experience is Section 2, where the costs of both nuclear and fossil fired plants are reviewed. Other sections give emphasis to the analysis of the major issues and relevant cost elements influencing the costs of nuclear power plants and to a discussion of cost projections. Many of the conclusions can also be applied to conventional plants, although they are usually less important than in the case of nuclear plants. 1 ref., figs and tabs

  18. Biofuels cost developments in the EU27+ until 2030. Full-chain cost assessment and implications of policy options. REFUEL WP4 final report

    International Nuclear Information System (INIS)

    Londo, H.M.; Lensink, S.M.; Deurwaarder, E.P.; Wakker, A.; De Wit, M.; Junginger, M.; Koenighofer, K; Jungmeier, G.

    2008-02-01

    With the rapid developments in the biofuels domain comes the need for biofuel policies that spur their introduction in a responsible way. The REFUEL project, supported by the EU Intelligent Energy Europe programme, develops a road map for biofuels in the EU27+ up to 2030. This WP4 report shows the results of a full-chain analysis of the costs of different biofuels. Effects of different levels of biofuel target setting were analysed, and also the impact of different additional policy measures, such as the introduction of a CO2 pricing mechanism and specific subsidies

  19. Ceramics Technology Project database: September 1991 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1992-06-01

    The piston ring-cylinder liner area of the internal combustion engine must withstand very-high-temperature gradients, highly-corrosive environments, and constant friction. Improving the efficiency in the engine requires ring and cylinder liner materials that can survive this abusive environment and lubricants that resist decomposition at elevated temperatures. Wear and friction tests have been done on many material combinations in environments similar to actual use to find the right materials for the situation. This report covers tribology information produced from 1986 through July 1991 by Battelle columbus Laboratories, Caterpillar Inc., and Cummins Engine Company, Inc. for the Ceramic Technology Project (CTP). All data in this report were taken from the project`s semiannual and bimonthly progress reports and cover base materials, coatings, and lubricants. The data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies, but not to draw conclusions from these data.

  20. The cost-effectiveness of quality improvement projects: a conceptual framework, checklist and online tool for considering the costs and consequences of implementation-based quality improvement.

    Science.gov (United States)

    Thompson, Carl; Pulleyblank, Ryan; Parrott, Steve; Essex, Holly

    2016-02-01

    In resource constrained systems, decision makers should be concerned with the efficiency of implementing improvement techniques and technologies. Accordingly, they should consider both the costs and effectiveness of implementation as well as the cost-effectiveness of the innovation to be implemented. An approach to doing this effectively is encapsulated in the 'policy cost-effectiveness' approach. This paper outlines some of the theoretical and practical challenges to assessing policy cost-effectiveness (the cost-effectiveness of implementation projects). A checklist and associated (freely available) online application are also presented to help services develop more cost-effective implementation strategies. © 2015 John Wiley & Sons, Ltd.

  1. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  2. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  3. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  4. Costing methods for nuclear desalination

    International Nuclear Information System (INIS)

    1966-01-01

    The question of the methods used for costing desalination plants has been recognized as very important in the economic choice of a plant and its optimization. The fifth meeting of the Panel on the Use of Nuclear Energy in Saline Water Conversion, convened by the International Atomic Energy Agency in April 1965, noted this fact and recommended the preparation of a report on suitable methods for costing and evaluating nuclear desalination schemes. The Agency has therefore prepared this document, which was reviewed by an international panel of experts that met in Vienna from 18 to 22 April, 1966. The report contains a review of the underlying principles for costing desalination plants and of the various methods that have been proposed for allocating costs in dual-purpose plants. The effect of the different allocation methods on the water and power costs is shown at the end of the report. No attempt is made to recommend any particular method, but the possible limitations of each are indicated. It is hoped that this report will help those involved in the various phases of desalination projects

  5. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  6. AX Tank Farm waste retrieval alternatives cost estimates

    International Nuclear Information System (INIS)

    Krieg, S.A.

    1998-01-01

    This report presents the estimated costs associated with retrieval of the wastes from the four tanks in AX Tank Farm. The engineering cost estimates developed for this report are based on previous cost data prepared for Project W-320 and the HTI 241-C-106 Heel Retrieval System. The costs presented in this report address only the retrieval of the wastes from the four AX Farm tanks. This includes costs for equipment procurement, fabrication, installation, and operation to retrieve the wastes. The costs to modify the existing plant equipment and systems to support the retrieval equipment are also included. The estimates do not include operational costs associated with pumping the waste out of the waste receiver tank (241-AY-102) between AX Farm retrieval campaigns or transportation, processing, and disposal of the retrieved waste

  7. Ceramic Technology Project database: September 1993 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1994-01-01

    Data presented in this report represent an intense effort to improve processing methods, testing methods, and general mechanical properties of candidate ceramics for use in advanced heat engines. Materials discussed include GN-10, GS-44, GTE PY6, NT-154, NT-164, sintered-reaction-bonded silicon nitrides, silicon nitride combined with rare-earth oxides, NT-230, Hexoloy SX-G1, Dow Corning`s {beta}-Si{sub 3}N{sub 4}, and a few whisker-reinforced ceramic composites. Information in this report was taken from the project`s semiannual and bimonthly progress reports and from final reports summarizing the results of individual studies. Test results are presented in tabular form and in graphs. All data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies but not to draw conclusions from those data.

  8. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  9. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1997-01-01

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations

  10. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, W.W.

    1997-12-30

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

  11. Offshore Wind Resource, Cost, and Economic Potential in the State of Maine

    Energy Technology Data Exchange (ETDEWEB)

    Musial, Walter D. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-02-12

    This report provides information for decision-makers about floating offshore wind technologies in the state of Maine. It summarizes research efforts performed at the National Renewable Energy Laboratory between 2015 and 2017 to analyze the resource potential, cost of offshore wind, and economic potential of offshore wind from four primary reports: Musial et al. (2016); Beiter et al. (2016, 2017); and Mone et al. (unpublished). From Musial et al. (2016), Maine's technical offshore wind resource potential ranked seventh in the nation overall with more than 411 terawatt-hours/year of offshore resource generating potential. Although 90% of this wind resource is greater than 9.0-meters-per-second average velocity, most of the resource is over deep water, where floating wind technology is needed. Levelized cost of energy and levelized avoided cost of energy were computed to estimate the unsubsidized 'economic potential' for Maine in the year 2027 (Beiter et al. 2016, 2017). The studies found that Maine may have 65 gigawatts of economic potential by 2027, the highest of any U.S. state. Bottom-line costs for the Aqua Ventus project, which is part of the U.S. Department of Energy's Advanced Technology Demonstration project, were released from a proprietary report written by NREL in 2016 for the University of Maine (Mone et al. unpublished). The report findings were that economies of scale and new technology advancements lowered the cost from $300/megawatt-hour (MWh) for the two-turbine 12-megawatt (MW) Aqua Ventus 1 project, to $126/MWh for the commercial-scale, 498-MW Aqua Ventus-2 project. Further cost reductions to $77/MWh were found when new technology advancements were applied for the 1,000-MW Aqua Ventus-3 project in 2030. No new analysis was conducted for this report.

  12. 2015 Cost of Wind Energy Review

    Energy Technology Data Exchange (ETDEWEB)

    Moné, Christopher [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hand, Maureen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rand, Joseph [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Heimiller, Donna [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ho, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-06-27

    This report uses representative utility-scale projects to estimate the levelized cost of energy (LCOE) for land-based and offshore wind plants in the United States. Data and results detailed here are derived from 2015 commissioned plants. More specifically, analysis detailed here relies on recent market data and state-of-the-art modeling capabilities to maintain an up-to-date understanding of wind energy cost trends and drivers. It is intended to provide insight into current component-level costs as well as a basis for understanding variability in LCOE across the industry. This publication reflects the fifth installment of this annual report.

  13. Costs for district heating development. Status 2010; Kostnader for fjernvarmeutbygging. Status 2010

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report 'Costs of district heating development' presents the costs for district heating based on bioenergy primarily as base load. The report aims to be a tool for the heating developer to set up the investment budget and implement pilot projects. The project is funded by the Norwegian District Heating with support from Enova SF and implemented in close cooperation with the Norwegian district heating. (AG)

  14. Fermilab ACP multi-microprocessor project

    International Nuclear Information System (INIS)

    Gaines, I.; Areti, H.; Biel, J.; Bracker, S.; Case, G.; Fischler, M.; Husby, D.; Nash, T.

    1984-08-01

    We report on the status of the Fermilab Advanced Computer Program's project to provide more cost-effective computing engines for the high energy physics community. The project will exploit the cheap, but powerful, commercial microprocessors now available by constructing modular multi-microprocessor systems. A working test bed system as well as plans for the next stages of the project are described

  15. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  16. The fracture zone project - final report

    International Nuclear Information System (INIS)

    Andersson, Peter

    1993-09-01

    This report summarizes the work and the experiences gained during the fracture zone project at the Finnsjoen study site. The project is probably the biggest effort, so far, to characterize a major fracture zone in crystalline bedrock. The project was running between 1984-1990 involving a large number of geological, geohydrological, geochemical, and geomechanical investigation. The methods used for identification and characterization are reviewed and discussed in terms of applicability and possible improvements for future investigations. The discussion is exemplified with results from the investigation within the project. Flow and transport properties of the zone determined from hydraulic tests and tracer tests are discussed. A large number of numerical modelling efforts performed within the fracture zone project, the INTRAVAL project, and the SKB91-study are summarized and reviewed. Finally, occurrence of similar zones and the relevance of major low angle fracture zones in connection to the siting of an underground repository is addressed

  17. Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Musante, Patricia

    This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…

  18. NREL Energy Storage Projects: FY2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  19. Project 2nd Periodic Report - Section 2

    DEFF Research Database (Denmark)

    Healy, Mark; Knowles, Emma; Johnstone, Cameron

    The work described in this publication has received support from the European Community - Research Infrastructure Action under the FP7 “Capacities” Specific Programme through grant agreement number 262552, MaRINET. Project Periodic Report. 2nd Period: October 2012 – March 2014 inclusive.......The work described in this publication has received support from the European Community - Research Infrastructure Action under the FP7 “Capacities” Specific Programme through grant agreement number 262552, MaRINET. Project Periodic Report. 2nd Period: October 2012 – March 2014 inclusive....

  20. Project Aprendizaje. Final Evaluation Report 1992-93.

    Science.gov (United States)

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  1. The indirect costs and benefits of greenhouse gas limitations

    Energy Technology Data Exchange (ETDEWEB)

    Markandya, A

    1999-12-31

    The purpose of this report is to evaluate GHG limitation issues in a broader context. This includes the impacts of projects on vulnerable groups, the impacts on the environment more generally and the impacts on sustainability in a wider sense. It also offers some advice on how a decision-making framework can bring together these different dimensions. The structure of the guidelines is as follows. Section 2 introduces essential cost concepts and discusses the adjustments needed to the financial costs of different components, to arrive at the true economic costs. Section 3 looks at the macro-economic impacts of different GHG limitation project/policies. Section 4 discusses the way in which the sustainability concerns of such projects/policies can be monitored. Section 5 brings these different components together and looks at different methods of project selection. Section 6 provides a basic framework of impacts that are likely to arise in different GHG-related projects/policies, and what kind of method of estimation is available for these different impacts. Sections 7 to 9 go into greater depth on specific impacts. Sections 7 and 8 look at the employment and distributional effects respectively, and how they might be estimated. Section 9 evaluates the benefits in terms of changes in environmental damage resulting from GHG projects/policies. Section 10 provides three case studies in which the methods outlined in the report are applied. These case studies consider a biogas plant in Tanzania, a forestry project in the Russian Federation, and an energy efficiency project in Thailand. Section 11 concludes the report. (au) 59 refs.

  2. The indirect costs and benefits of greenhouse gas limitations

    Energy Technology Data Exchange (ETDEWEB)

    Markandya, A.

    1998-12-31

    The purpose of this report is to evaluate GHG limitation issues in a broader context. This includes the impacts of projects on vulnerable groups, the impacts on the environment more generally and the impacts on sustainability in a wider sense. It also offers some advice on how a decision-making framework can bring together these different dimensions. The structure of the guidelines is as follows. Section 2 introduces essential cost concepts and discusses the adjustments needed to the financial costs of different components, to arrive at the true economic costs. Section 3 looks at the macro-economic impacts of different GHG limitation project/policies. Section 4 discusses the way in which the sustainability concerns of such projects/policies can be monitored. Section 5 brings these different components together and looks at different methods of project selection. Section 6 provides a basic framework of impacts that are likely to arise in different GHG-related projects/policies, and what kind of method of estimation is available for these different impacts. Sections 7 to 9 go into greater depth on specific impacts. Sections 7 and 8 look at the employment and distributional effects respectively, and how they might be estimated. Section 9 evaluates the benefits in terms of changes in environmental damage resulting from GHG projects/policies. Section 10 provides three case studies in which the methods outlined in the report are applied. These case studies consider a biogas plant in Tanzania, a forestry project in the Russian Federation, and an energy efficiency project in Thailand. Section 11 concludes the report. (au) 59 refs.

  3. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  4. Cost Accounting System for fusion studies

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

    1985-12-01

    A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program

  5. Cost Accounting System for fusion studies

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, W.R.; Keeton, D.C.; Thomson, S.L.

    1985-12-01

    A Cost Accounting System that is applicable to all magnetic fusion reactor design studies has been developed. This system provides: (1) definitions of the elements of cost and methods for the combination of these elements to form a cost estimate; (2) a Code of Accounts that uses a functional arrangement for identification of the plant components; and (3) definitions and methods to analyze actual cost data so that the data can be directly reported into this Cost Accounting System. The purpose of the Cost Accounting System is to provide the structure for the development of a fusion cost data base and for the development of validated cost estimating procedures. This system has been developed through use at the Fusion Engineering Design Center (FEDC) and has been applied to different confinement concepts (tokamaks and tandem mirrors) and to different types of projects (experimental devices and commercial power plants). The use of this Cost Accounting System by all magnetic fusion projects will promote the development of a common cost data base, allow the direct comparison of cost estimates, and ultimately establish the cost credibility of the program.

  6. An integrated framework for cost- benefit analysis in road safety projects using AHP method

    Directory of Open Access Journals (Sweden)

    Mahsa Mohamadian

    2011-10-01

    Full Text Available Cost benefit analysis (CBA is a useful tool for investment decision-making from economic point of view. When the decision involves conflicting goals, the multi-attribute analysis approach is more capable; because there are some social and environmental criteria that cannot be valued or monetized by cost benefit analysis. The complex nature of decision-making in road safety normally makes it difficult to reach a single alternative solution that can satisfy all decision-making problems. Generally, the application of multi-attribute analysis in road sector is promising; however, the applications are in preliminary stage. Some multi-attribute analysis techniques, such as analytic hierarchy process (AHP have been widely used in practice. This paper presents an integrated framework with CBA and AHP methods to select proper alternative in road safety projects. The proposed model of this paper is implemented for a case study of improving a road to reduce the accidents in Iran. The framework is used as an aid to cost benefit tool in road safety projects.

  7. Windpower project ownership and financing: The cost impacts of alternative development structures

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.H. [Lawrence Berkeley National Lab., CA (United States)

    1997-12-31

    This paper uses traditional financial cash-flow techniques to examine the impact of different ownership and financing structures on the cost of wind energy. While most large-scale wind projects are constructed, operated, and financed by non-utility generators (NUGs) via project financing, investor- and publicly-owned utilities have expressed interest in owning and financing their own facilities rather than purchasing wind energy from independent generators. A primary justification for utility ownership is that, because of financing and tax benefits, windpower may be cheaper when developed in this fashion. The results presented in this paper support that justification, though some of the estimated cost savings associated with utility ownership are found to be a result of shortcomings in utility analysis procedures and implicit risk shifting. This paper also discusses the comparative value of the federal production tax credit and renewable energy production incentive; estimates the financing premium paid by NUG wind owners compared to traditional gas-fired generation facilities; and explores the impact of electricity restructuring on financing.

  8. Socio-economic research on fusion. SERF 1997-98. Macro Tast E2: External costs and benefits. Task 2: Comparison of external costs

    International Nuclear Information System (INIS)

    Schleisner, Lotte; Korhonen, Riitta

    1998-12-01

    This report is part of the SERF (Socio-Economic Research on Fusion) project, Macro Task E2, which covers External Costs and Benefits. The report is the documentation of Task 2, Comparison of External Costs. The aim of Task 2 Comparison of External Costs, has been to compare the external costs of the fusion energy with those from other alternative energy generation technologies. In this task identification and quantification of the external costs for wind energy and photovoltaic have been performed by Risoe, while identification and quantification of the external cost for nuclear fission and fossil fuels have been discussed by VTT. The methodology used for the assessment of the externalities of the fuel cycles selected has been the one developed within the ExternE Project. First estimates for the externalities of fusion energy have been under examination in Macrotask E2. Externalities of fossil fuels and nuclear fission have already been evaluated in the ExternE project and a vast amount of material for different sites in various countries is available. This material is used in comparison. In the case of renewable wind energy and photovoltaic are assessed separately. External costs of the various alternatives may change as new technologies are developed and costs can to a high extent be avoided (e.g. acidifying impacts but also global warming due to carbon dioxide emissions). Also fusion technology can experience major progress and some important cost components probably can be avoided already by 2050. (EG)

  9. Socio-economic research on fusion. SERF 1997-98. Macro Tast E2: External costs and benefits. Task 2: Comparison of external costs

    Energy Technology Data Exchange (ETDEWEB)

    Schleisner, Lotte; Korhonen, Riitta

    1998-12-01

    This report is part of the SERF (Socio-Economic Research on Fusion) project, Macro Task E2, which covers External Costs and Benefits. The report is the documentation of Task 2, Comparison of External Costs. The aim of Task 2 Comparison of External Costs, has been to compare the external costs of the fusion energy with those from other alternative energy generation technologies. In this task identification and quantification of the external costs for wind energy and photovoltaic have been performed by Risoe, while identification and quantification of the external cost for nuclear fission and fossil fuels have been discussed by VTT. The methodology used for the assessment of the externalities of the fuel cycles selected has been the one developed within the ExternE Project. First estimates for the externalities of fusion energy have been under examination in Macrotask E2. Externalities of fossil fuels and nuclear fission have already been evaluated in the ExternE project and a vast amount of material for different sites in various countries is available. This material is used in comparison. In the case of renewable wind energy and photovoltaic are assessed separately. External costs of the various alternatives may change as new technologies are developed and costs can to a high extent be avoided (e.g. acidifying impacts but also global warming due to carbon dioxide emissions). Also fusion technology can experience major progress and some important cost components probably can be avoided already by 2050. (EG) 36 refs.

  10. Projected costs for mined geologic repositories for dispoal of commercial nuclear wastes

    International Nuclear Information System (INIS)

    Waddell, J.D.; Dippold, D.G.; McSweeney, T.I.

    1982-12-01

    This documen reports cost estimates for: (1) the exploration and development activities preceding the final design of terminal isolation facilities for disposal of commercial high-level waste; and (2) the design, construction, operation, and decommissioning of such facilities. Exploration and evelopment costs also include a separate cost category for related programs such as subseabed research, activities of the Transportation Technology Center, and waste disposal impact mitigation activities

  11. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  12. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  13. Decommissioning Cost Estimating -The ''Price'' Approach

    International Nuclear Information System (INIS)

    Manning, R.; Gilmour, J.

    2002-01-01

    Over the past 9 years UKAEA has developed a formalized approach to decommissioning cost estimating. The estimating methodology and computer-based application are known collectively as the PRICE system. At the heart of the system is a database (the knowledge base) which holds resource demand data on a comprehensive range of decommissioning activities. This data is used in conjunction with project specific information (the quantities of specific components) to produce decommissioning cost estimates. PRICE is a dynamic cost-estimating tool, which can satisfy both strategic planning and project management needs. With a relatively limited analysis a basic PRICE estimate can be produced and used for the purposes of strategic planning. This same estimate can be enhanced and improved, primarily by the improvement of detail, to support sanction expenditure proposals, and also as a tender assessment and project management tool. The paper will: describe the principles of the PRICE estimating system; report on the experiences of applying the system to a wide range of projects from contaminated car parks to nuclear reactors; provide information on the performance of the system in relation to historic estimates, tender bids, and outturn costs

  14. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  15. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Charles [Delta Products, Triangle Park, NC (United States)

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical

  16. The cost and value of pre-registration clinical placements for Project 2000 students.

    Science.gov (United States)

    Jones, M L; Akehurst, R

    1999-07-01

    The research outlined in this article was commissioned by the Sheffield and North Trent College of Nursing and Midwifery to explore the cost implications of pre-registration clinical placements in the context of Project 2000. The authors outline the methodology and findings of an exercise designed to collect relevant cost information which was not readily available. On the basis of these findings, they suggest that: at 1995/1996 pay and prices, clinical placements cost the education provider approximately pound 890 per student per annum; in terms of real resources, the value to service providers of the service contribution made by second- and third-year nursing and midwifery students on ward-based placements outweighs the value of the time spent by qualified staff on their supervision and education. Once the funding assumptions underlying the introduction of Project 2000 have been taken into account, second- and third-year nursing and midwifery students benefit the service provider by on average pound 3.46 for every hour they spend in an unrostered ward-based placement. The service contribution made by students in community-based clinical placements cannot free staff time in the same way as on the wards and, because qualified staff in these areas are generally more highly graded, the value of the time they spend on the supervision and education of students on placement is higher than in ward-based placements. Second- and third-year students therefore appear to cost the service provider on average pound 0.48 for each hour they spend in a community-based placement. It was not possible to determine whether this cost translates into a reduction in patient contacts.

  17. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  18. CENELEC Project Report Smart House Roadmap (draft)

    NARCIS (Netherlands)

    Hartog, F.T.H. den; Suters, T.; Parsons, J.; Faller, J.

    2010-01-01

    This CENELEC project report has been drafted by a project team and steering group of representatives of interested parties and is to be endorsed on 2010-11-23. Neither the national members of CENELEC nor the CEN-CENELEC Management Centre can be held accountable for the technical content of this

  19. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  20. Benchmarking U.S. Small Wind Costs with the Distributed Wind Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Poehlman, Eric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-10-04

    The objective of this report is to benchmark costs for small wind projects installed in the United States using a distributed wind taxonomy. Consequently, this report is a starting point to help expand the U.S. distributed wind market by informing potential areas for small wind cost-reduction opportunities and providing a benchmark to track future small wind cost-reduction progress.

  1. Massachusetts Crystalline Repository Project. Progress report, December 31, 1985

    International Nuclear Information System (INIS)

    1985-01-01

    Project activities which have been undertaken include the following: review and comment on OCRD projects reports; review of pertinent DOE, NRC, EPA, and DOT quidelines and regulations; review of reports and maps released by the federal project group and contractors; attendance at DOE workshops and conferences; implementation of state-specific research activities; interaction with representatives of federal agencies and other participating states; and interface with media, state officials and legislators, and interested citizens

  2. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  3. Cost Estimates and Investment Decisions

    International Nuclear Information System (INIS)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  4. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  5. ROLL OUT THE TALENT : Final project report

    OpenAIRE

    Eerola, Tuomas; Tuominen, Pirjo; Hakkarainen, Riitta-Liisa; Laurikainen, Marja; Mero, Niina

    2014-01-01

    The ROLL OUT THE TALENT project was born out of the desire to recognise and support the strengths of vocational students and to develop new and innovative operating models. ROLL OUT THE TALENT promoted regional cooperation between institutes and companies. The project produced operating and study path models that take into consideration the individual strengths of vocational students and the principles of lifelong learning. This is the final report of the ROLL OUT THE TALENT project, and ...

  6. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  7. Learning curve approach to projecting cost and performance for photovoltaic technologies

    Science.gov (United States)

    Cody, George D.; Tiedje, Thomas

    1997-10-01

    The current cost of electricity generated by PV power is still extremely high with respect to power supplied by the utility grid, and there remain questions as to whether PV power can ever be competitive with electricity generated by fossil fuels. An objective approach to this important question was given in a previous paper by the authors which introduced analytical tools to define and project the technical/economic status of PV power from 1988 through the year 2010. In this paper, we apply these same tools to update the conclusions of our earlier study in the context of recent announcements by Amoco/Enron-Solar of projected sales of PV power at rates significantly less than the U.S. utility average.

  8. The Oregon Applied Academics Project: Final Report

    Science.gov (United States)

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  9. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

  10. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  11. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  12. Projection report 2015 according to the EU regulation no. 525/2013/EU; Projektionsbericht 2015 gemaess der Verordnung (EU) Nr. 525/2013/EU

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    For the German projection report 2015 a research consort has elaborated a with-measures-scenario for the development of greenhouse gas emission in Germany for the period 2005 to 2035. The following issues are covered: demographic and economic data, projection of the primary energy cost development; prices for greenhouse emission permissions (traffic, private households, industry); overall measures, measured within individual sections; quantification of the effect of climate protection measures and instruments including methodology and sensitivity analyses (traffic, buildings, private households, commerce, industry, energy production, agriculture, waste industry), projection results.

  13. Residential construction cost: An Italian survey.

    Science.gov (United States)

    Canesi, Rubina; Marella, Giuliano

    2017-04-01

    This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy). The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  14. Residential construction cost: An Italian survey

    Directory of Open Access Journals (Sweden)

    Rubina Canesi

    2017-04-01

    Full Text Available This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy. The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  15. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  16. 42 CFR 56.603 - Project elements.

    Science.gov (United States)

    2010-10-01

    ... set forth in the most recent CSA Poverty Income Guidelines (42 CFR 1060.2) (except that nominal fees... statistical data, cost accounting, management information, and reporting or monitoring systems which will meet the project's management needs and shall enable the project to provide such statistics and other...

  17. Extreme project. Progress report 2006

    International Nuclear Information System (INIS)

    Eyrolle, F.; Masson, O.; Charmasson, S.

    2007-01-01

    The E.X.T.R.E.M.E. project introduced in 2005 to the S.E.S.U.R.E. / L.E.R.C.M. has for objectives to acquire data on the consequences of the extreme climatic meteorological episodes on the distribution of the artificial radioisotopes within the various compartments of the geosphere. This report presents the synthesis of the actions developed in 2006 in positioning and in co financing of the project by means of regional or national research programs (C.A.R.M.A., E.X.T.R.E.M.A., E.C.C.O.R.E.V.I.), of data acquisition, valuation and scientific collaboration. (N.C.)

  18. Pervasive Mobile and Ambient Wireless Communications COST Action 2100

    CERN Document Server

    Zanella, Alberto

    2012-01-01

    Pervasive Mobile and Ambient Wireless Communications reports the findings of COST 2100, a project of the European intergovernmental COST framework addressing various topics currently emerging in mobile and wireless communications. Drawing on experience developed in this and earlier COST projects, the text represents the final outcome of collaborative work involving more than 500 researchers in 140 institutions and 30 countries (including outside Europe). The book’s subject matter includes: • transmission techniques; • signal processing; • radio channel modelling and measurement; • radio network issues; and • recent paradigms including ultra-wideband, cooperative, vehicle-to-vehicle and body communications. The research reported comes from a variety of backgrounds: academic, equipment-manufacturing and operational. The information contained in this book will bring the study reported to a wider audience from all those spheres of work. Pervasive Mobile and Ambient Wireless Communications will be of i...

  19. Cost analysis and cost justification of automated data processing in the clinical laboratory.

    Science.gov (United States)

    Westlake, G E

    1983-03-01

    Prospective cost analysis of alternative data processing systems can be facilitated by proper selection of the costs to be analyzed and realistic appraisal of the effect on staffing. When comparing projects with dissimilar cash flows, techniques such as analysis of net present value can be helpful in identifying financial benefits. Confidence and accuracy in prospective analyses will increase as more retrospective studies are published. Several accounts now in the literature describe long-term experience with turnkey laboratory information systems. Acknowledging the difficulty in longitudinal studies, they all report favorable effects on labor costs and recovery of lost charges. Enthusiasm is also expressed for the many intangible benefits of the systems. Several trends suggest that cost justification and cost effectiveness will be more easily demonstrated in the future. These are the rapidly decreasing cost of hardware (with corresponding reduction in service costs) and the entry into the market of additional systems designed for medium to small hospitals. The effect of broadening the sales base may be lower software prices. Finally, operational and executive data management and reporting are destined to become the premier extensions of the LIS for cost justification. Aptly applied, these facilities can promote understanding of costs, control of costs, and greater efficiency in providing laboratory services.

  20. Project Progress Assessment Report (PPAR) 2015

    International Nuclear Information System (INIS)

    Sall, Baba

    2015-01-01

    This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.