  1. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  3. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  4. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  5. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  6. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  7. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  8. 30 CFR 881.6 - Project contract.

    Science.gov (United States)

    2010-07-01

    ... contractors or suppliers for the construction, installation, services or work to be performed. (b) Project... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a...

  9. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  10. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  11. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  12. The interplay between formal and informal contracting in integrated project delivery

    NARCIS (Netherlands)

    Bygballe, L.E.; Dewulf, Geert P.M.R.; Levitt, R.

    2015-01-01

    This research examines the interplay between formal and informal contracting in integrated project delivery (IPD). It investigates how the interplay enables parties in health-care construction projects to cope with uncertainty and complexities, due to, among others, changing demands. New delivery

  13. Contract types for nuclear power projects, non-turnkey type contracts in particular

    International Nuclear Information System (INIS)

    Nyte'n, T.

    1975-01-01

    A non-turnkey contract differs from a turnkey contract in no special formal way. The way the buyer chooses to exercise his project leadership must be concretized in the contract. The way and extent he wishes to exercise technical checking must be laid down in the form of clear rules. The way information has to flow from one contractor over buyer to others and vice versa has to be laid down in detail and the consequences of non conformance fixed in such a manner that optimum project performance is reached. (orig./FW) [de

  14. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  15. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  16. A Social Contract for University-Industry Collaboration: A Case of Project-Based Learning Environment

    Science.gov (United States)

    Vartiainen, Tero

    This study determines a social contract for a form of university-industry collaboration to a project-based learning environment in close collaboration with industry. The author's previous studies on moral conflicts in a project-based learning (PjBL) environment and his 5-year engagement in the PjBL environment are used as background knowledge, and John Rawls' veil of ignorance is used as a method in the contract formulation. Fair and impartial treatment of actors is strived for with the contract which constitutes of sets of obligations for each party, students, clients, and university (instructors) in the chosen project course. With the contract fair and impartial treatment of actors is strived for and the most dilemmatic moral conflicts are tried to be avoided. The forming of the social contract is evaluated, and implications for research and collaborations in practice are offered.

  17. Neutron-Induced Fission Cross Section of Uranium, Americium and Curium Isotopes. Progress report - Research Contract 14485, Coordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Alekseev, A.A.; Bergman, A.A.; Berlev, A.I.; Koptelov, E.A.; Samylin, B.F.; Trufanov, A.M.; Fursov, B.I.; Shorin, V.S.

    2009-12-01

    This report contains brief description of the Lead Slowing Down Spectrometer and results of measurements of neutron-induced fission cross sections for 236 U, 242m Am, 243 Cm, 244 Cm, 245 Cm and 246 Cm done at this spectrometer. The work was partially supported through the IAEA research contract RC-14485-RD in the framework of the IAEA Coordinated Research Project 'Minor Actinide Neutron Reaction Data (MANREAD)'. The detailed description of the experimental set up, measurements procedure and data treatment can be found in the JIA-1182 (2007) and JIA-1212 (2009) reports from the Institute of Nuclear Research of the Russian Academy of Science published in Russian. Part 1 contains the first year report of the research contract and part 2 the second year report. (author)

  18. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  19. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  20. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  1. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  2. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  3. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  5. Process Improvement for Interinstitutional Research Contracting.

    Science.gov (United States)

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  6. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  7. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  8. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  9. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  10. IAEA research contracts. First annual report

    International Nuclear Information System (INIS)

    1961-01-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation

  11. IAEA research contracts. First annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-07-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation.

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  13. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  14. Research on the energy-saving and revenue sharing strategy of ESCOs under the uncertainty of the value of Energy Performance Contracting Projects

    International Nuclear Information System (INIS)

    Qian, Dong; Guo, Ju’e

    2014-01-01

    Under the uncertainty of the value of Energy Performance Contracting Projects (EPCPs), this paper develops a revenue-sharing bargaining model between an Energy Service Company (ESCO) and an Energy-Using Organization (EU). Based on the model the paper analyzes the impacts of energy prices, risk-adjusted discount rates and accidents on the ESCO’s bargaining strategies. The research shows that the greater the probability of adverse circumstances is, the higher is the revenue share (of the EU), and the more disadvantageous is the ESCO’s position in the game. Furthermore, we design a forecast–commitment contract between an ESCO and an EU and analyze the optimal product’s energy savings commitment strategy of the ESCO to cope with uncertain energy savings and contract risk. The research illustrates that by introducing penalties and commitments, the contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent; when the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment, thus enhancing the strategy value of the bilateral relationship and reducing the contract risk. Finally, the policy recommendations about improving shared savings contract standard, third-party energy savings measurement and verification mechanism and arbitration mechanism of EPCs are provided. - Highlights: • We provide a method for determining the revenue-sharing bargaining strategy space in a finite bargaining game of the ESCO. • The increase of the probability of adverse circumstances will increase the revenue share (of the EU). • We design a forecast–commitment contract between an ESCO and an EU. • The forecast–commitment contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent. • When the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment

  15. Legal Considerations for International Collaborative Research Contract

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Kim, H. J.; Lee, J. H.

    2007-01-01

    Though collaborative research is pure academic activity the research plan and resource allocation for the research are shaped under foam of contract. Thus, legal binding effect and compulsive instrument is adopted at the research contract. This paper aimed at guiding equal collaborative research contract in legal aspect. To reach the goal (1) enforceability and elements of international collaborative contract, (2) damage calculation and related issues with those topics shall be discussed in each section

  16. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  17. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  18. Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2018-03-01

    Full Text Available One of the highly rated causes of poor performance is errors in contract documents. The objectives of this study are to investigate the prevalent errors in contract documents and their effects on construction projects. Questionnaire survey and 51 case study projects (mixed method were adopted for the study. The study also involved the use of Delphi technique to extract the possible errors that may be contained in contract documents; it did not however constitute the empirical data for the study. The sample of the study consists of 985 consulting and 275 contracting firms that engaged in the construction of building projects that were completed between 2013 and 2016 and were above the ground floor. The two-stage stratified random sampling technique was adopted for the study. The data for the study were analysed with descriptive and inferential statistics (based on Shapiro-Wilk’s test. The results of the study indicate that errors in contract documents were moderately prevalent. However, overmeasurement in bill of quantities was prevalent in private, institutional and management procured projects. Traditionally procured projects contain 68% of the errors in contract documents among the procurement methods. Drawings contain the highest number of errors, followed by bill of quantities and specifications. The severe effects of errors in contract documents were structural collapse, deterioration of buildings and contractors’ claims among others. The result of the study implies that, management procurement method is the route to error minimization in developing countries, but it may need to be backed by law and guarded against overmeasurement.

  19. The Research Contract Programme annual report and statistics for 2000

    International Nuclear Information System (INIS)

    2001-06-01

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  20. The Research Contract Programme annual report and statistics for 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-15

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  1. The complexity of collaboration: Opportunities and challenges in contracted research

    Directory of Open Access Journals (Sweden)

    Marion Bowl

    2010-11-01

    Full Text Available This article explores some of the challenges of utilising collaborative research approaches when undertaking contracted research projects for government and non-government agencies in the adult and community education (ACE sector. To discuss these challenges, the article draws on three recent examples of research projects undertaken for ACE sector organisations in Aotearoa New Zealand. These challenges include managing relationships with the different parties to the research; dealing with conflicting expectations of funding agencies, commissioning organisations and practitioners; and ownership and dissemination of findings. We highlight the complexity of notions of collaboration and the importance of deliberate trust-building in establishing credibility. We also open up for discussion the thorny issues of who owns the right to disseminate research findings and how far should researchers’ and universities’ responsibilities extend to ensure that research findings are put in the public domain?

  2. Contract Research, the University, and the Academic.

    Science.gov (United States)

    Crawshaw, Bruce

    1985-01-01

    Implications of the growth of university-based contract research are examined, including moral and ethical issues, legal aspects, ownership of research results, staff rights, researcher status, publication, authority, responsibility, social justice, and conflicts between teaching and research. Eleven suggestions for successful contract research…

  3. Technical note: Analysis of claims and disputes in contracts for oil and gas development projects in Iran with solutions

    Directory of Open Access Journals (Sweden)

    Fathollah Sajedi

    2017-08-01

    Full Text Available Contracts for oil and gas development projects are naturally complex, they are explained with some of maps and technical specifications. To supply the goals of contracts, it is necessary to construct by a team having owner, consulting engineer and contractor. The unique aspects of each project and team working are resulting to disagreements. It should be noted that the majority of team workers have not previously worked together. It may not be expected to forecast all project aspects in design and preparation of tender documents process. However, in some cases it will occur inconsistencies in contract documents and possibly may be disagreements on commentary of the cases which there are in the provisions of the contract. Every root of disagreement resulted in to claim and finally dispute. Lack of foresight and/or existing ambiguous texts in some provisions of contract, not being aware of components of the project to conditions and obligations and rules of contract will complex and sometimes impossible the agreement on implementation problems. Therefore, the claims will be resulted in disputes and inflict financial losses to contractors and/or owners and then the projects will not be completed. In Iran many activities have not been carried out about claims and disputes in different orientations especially in areas futures and hence, it was studied in this research. Firstly, research history was considered and the causes of claims and disputes were identified in process of different levels of oil projects construction from primary to exploitation and then a questionnaire was prepared using the comments of experts. Finally, the questionnaire was analysed by SPSS and the approved factors in creation of claims and disputes and in their roots were ranked.

  4. Contracting in vivo research: what are the issues?

    Science.gov (United States)

    Underwood, Wendy J

    2007-07-01

    As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.

  5. Advanced energy projects: FY 1987 research summaries

    International Nuclear Information System (INIS)

    1987-09-01

    This report contains brief summaries of all projects active in the Division of Advanced Energy Projects during Fiscal Year 1987 (October 1, 1986-September 30, 1987). The intent of this compilation is to provide a convenient means for quickly acquainting an interested reader with the program in Advanced Energy Projects. More detailed information on research activities in a particular project may be obtained by contacting directly the principal investigator. Some projects will have reached the end of their contract periods by the time this book appears, and will, therefore, no longer be active. Those cases in which work was completed in FY '87 are indicated by the footnote: Project completed. The annual funding level of each project is shown

  6. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  7. IAEA research contracts. Seventh annual report

    International Nuclear Information System (INIS)

    1967-01-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  8. IAEA research contracts. Sixth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-04-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology.

  9. IAEA research contracts. Seventh annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-05-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  10. IAEA research contracts. Sixth annual report

    International Nuclear Information System (INIS)

    1966-01-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology

  11. 48 CFR 46.309 - Research and development contracts (short form).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Research and development... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.309 Research and development contracts... Development (Short Form), in solicitations and contracts for research and development when the clause...

  12. 48 CFR 970.35 - Research and development contracting.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and development contracting. ...

  13. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  14. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  15. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  16. Client’s flexibility in renovation projects with long-term DBFMO contracts

    NARCIS (Netherlands)

    Kuhlmann, M.; Blokhuis, E.G.J.; Han, Q.; Schaefer, W.F.; Yildiz, H.T.

    2009-01-01

    Construction project clients are faced with long-term commitments when opting for a DBFMO contract, the Dutch version of PFI. This way of contracting is characterized by the delivery of a full housing service to the client over a period of decades, offered by a construction consortium including

  17. Abstract and research accomplishments of University Coal Research Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their respective projects in time for distribution at a conference on June 13--14, 1995 at Tennessee State University in Nashville, Tennessee. This book is a compilation of the material received in response to that request. For convenience, the 70 grants reported in this book are stored into eight technical areas, Coal Science, Coal Surface Science, Reaction Chemistry, Advanced Process Concepts, Engineering Fundamentals and Thermodynamics, Environmental Science, high Temperature Phenomena, and Special topics. Indexes are provided for locating projects by subject, principal investigators, and contracting organizations. Each extended abstract describes project objectives, work accomplished, significance to the Fossil Energy Program, and plans for the next year.

  18. 48 CFR 235.070-1 - Indemnification under research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... research and development contracts. 235.070-1 Section 235.070-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.070-1 Indemnification under research and development contracts. (a...

  19. Basic research projects

    International Nuclear Information System (INIS)

    1979-04-01

    The research programs under the cognizance of the Office of Energy Research (OER) are directed toward discovery of natural laws and new knowledge, and to improved understanding of the physical and biological sciences as related to the development, use, and control of energy. The ultimate goal is to develop a scientific underlay for the overall DOE effort and the fundamental principles of natural phenomena so that these phenomena may be understood, and new principles, formulated. The DOE-OER outlay activities include three major programs: High Energy Physics, Nuclear Physics, and Basic Energy Sciences. Taken together, these programs represent some 30 percent of the Nation's Federal support of basic research in the energy sciences. The research activities of OER involve more than 6,000 scientists and engineers working in some 17 major Federal Research Centers and at more than 135 different universities and industrial firms throughout the United States. Contract holders in the areas of high-energy physics, nuclear physics, materials sciences, nuclear science, chemical sciences, engineering, mathematics geosciences, advanced energy projects, and biological energy research are listed. Funding trends for recent years are outlined

  20. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  1. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  2. 48 CFR 46.307 - Fixed-price research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.307 Fixed-price research and development... Development—Fixed-Price, in solicitations and contracts for research and development when (1) the primary... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price research and...

  3. PISA Research Project Portfolio. Towards a new understanding of technological decision-making

    International Nuclear Information System (INIS)

    Meskens, G.

    2006-01-01

    In 2005, the programme of integration of social sciences into nuclear research participates in several research projects. It is the aim to apply transdiciplinary problem-oriented methods in PhD's work, in contract research, in international networking and to take challenging opportunities in conferences

  4. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated.

  5. Data base on nuclear power plant dose reduction research projects

    International Nuclear Information System (INIS)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated

  6. Research projects in radiobiology and radiation protection

    International Nuclear Information System (INIS)

    1960-01-01

    Of the research projects sponsored by the International Atomic Energy Agency quite a large number are concerned with the biological effects of ionizing radiation. That itself, of course, is a very wide field covering such subjects as the nature and mechanism of radiation damage, genetic mutations, the varying radiosensitivity of different organisms, ways of modifying the natural sensitivity or resistance, and biological and chemical means of protection. In all these branches of enquiry, the Agency has awarded research contracts to scientific institutes or laboratories in different countries

  7. Research projects in radiobiology and radiation protection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-04-15

    Of the research projects sponsored by the International Atomic Energy Agency quite a large number are concerned with the biological effects of ionizing radiation. That itself, of course, is a very wide field covering such subjects as the nature and mechanism of radiation damage, genetic mutations, the varying radiosensitivity of different organisms, ways of modifying the natural sensitivity or resistance, and biological and chemical means of protection. In all these branches of enquiry, the Agency has awarded research contracts to scientific institutes or laboratories in different countries

  8. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.308 Cost-reimbursement... of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  9. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2002

    International Nuclear Information System (INIS)

    2003-08-01

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. The research work is normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. Doctoral CRPs, (previously known as Thematic CRPs), meant to complement traditional CRPs, are currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear technologies in developing Member States through CRPs that rest on pair building between agreement holders and contract holders and includes a PhD training programme at the contract holders? institutions. Further details of the administration of research contracts and general information on CRPs is contained in the Agency's Website at http://www-crp.iaea.org. The CRPs reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Material Technologies; Analysis for Sustainable Energy Development; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation Safety; Management of Radioactive Waste; Safeguards. The Sub-programmes supported by the CRPs are listed. Results of research are available to all Member States, and are disseminated through national, international and Agency scientific

  10. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-15

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. The research work is normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. Doctoral CRPs, (previously known as Thematic CRPs), meant to complement traditional CRPs, are currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear technologies in developing Member States through CRPs that rest on pair building between agreement holders and contract holders and includes a PhD training programme at the contract holders? institutions. Further details of the administration of research contracts and general information on CRPs is contained in the Agency's Website at http://www-crp.iaea.org. The CRPs reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Material Technologies; Analysis for Sustainable Energy Development; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation Safety; Management of Radioactive Waste; Safeguards. The Sub-programmes supported by the CRPs are listed. Results of research are available to all Member States, and are disseminated through national, international and Agency scientific

  11. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-15

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. The research work is normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear technologies in developing Member States through CRPs that rest on pair building between agreement holders and contract holders and includes a PhD training programme at the contract holders' institutions. Further details of the administration of research contracts and general information on CRPs is contained in the Agency?s Website at http://www.iaea.org/programmes/ri/uc.html. The CRPs reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Waste Management Technology; Comparative Assessment for Sustainable Energy Development; Food and Agriculture; Human Health; Marine Environment and Water Resources; Applications of Physical and Chemical Sciences; Nuclear Safety; Radiation Safety; Radioactive Waste Safety; Co-ordination of Safety Activities; Safeguards. The Sub-programmes supported by the CRPs are listed. Results of research are available to all Member States, and are disseminated through national

  12. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2001

    International Nuclear Information System (INIS)

    2002-07-01

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. The research work is normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear technologies in developing Member States through CRPs that rest on pair building between agreement holders and contract holders and includes a PhD training programme at the contract holders' institutions. Further details of the administration of research contracts and general information on CRPs is contained in the Agency?s Website at http://www.iaea.org/programmes/ri/uc.html. The CRPs reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Waste Management Technology; Comparative Assessment for Sustainable Energy Development; Food and Agriculture; Human Health; Marine Environment and Water Resources; Applications of Physical and Chemical Sciences; Nuclear Safety; Radiation Safety; Radioactive Waste Safety; Co-ordination of Safety Activities; Safeguards. The Sub-programmes supported by the CRPs are listed. Results of research are available to all Member States, and are disseminated through national

  13. The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

    Science.gov (United States)

    Suhaida, S. K.; Wong, Z. D.

    2017-11-01

    Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.

  14. Stimulation of Research in Biomedicine. Role of Effective Contract.

    Science.gov (United States)

    Aleksandrova, N V; Shkolnikova, M A; Dlin, V V; Yugay, M T

    Analysis of publication activity in the field of biomedicine shows insignificant input of Russia in the world scientific product. This is largely due to the lack of incentives for researchers. Article describes stimulation of researchers in Russia, compares it with foreign models, formulates main shortcomings of support and stimulation of research in Russia and introduces the concept of effective contract. Development of personnel motivation and stimulation of employees of scientific and research organizations in the field of health. As a successful experience the article describes the implementation of effective contract in Veltishev Research and Clinical Institute for Pediatrics where for years remuneration of researchers depended upon their positions without consideration of research results. Effective contract brought significant changes in the traditional system setting new performance and efficiency criteria. New evaluation system took into account publication activity, presentation activity, implementation of research results, raising scientific personnel, thesis work and income-generating activities. Introduction of effective contract already in the second year led to a rise in the number of foreign publications, publications in journals with impact factor of more than 2, the general increase in the number of articles in peer-reviewed journals with impact factor more than 0.3, the growth of the number of articles by 1 researcher, Hirsch index improving both by individual employees and the entire Institute, increase of grant activity and presentation activity at top-rated professional congresses. The growth of publication and presentation activities has been achieved at the reduction of research staff by 23%. From financial viewpoint effective contract resulted in the redistribution of resources in favour of more efficient researchers. The introduction of effective contract and increase of requirements for scientific output did not cause resistance of staff

  15. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    the technical and contractual requirements of the project. A project manager with extensive experience in major defence projects has been contracted and a team of technical and contracts specialists has now completed documentation which has been issued as a Request for Tender to four pre-qualified reactor vendors. The four vendors were selected as a result of a worldwide invitation in mid 1998 for expressions of interest. The tender process is a 'two envelope' system whereby the tenderers are required to submit in one envelope the technical and contractual details of their bid whilst submitting the pricing details in the other envelope. Tenders close on 3 January 2000. A contract is expected to be agreed by mid 2000 with commissioning completed during 2005

  16. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  17. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  18. Aspects of research and development contract terms in the bio/pharmaceutical sector.

    Science.gov (United States)

    Banerjee, Tannista

    2012-01-01

    The cost of new drug development is increasing every year. Pharmaceutical companies use R&D joint ventures, mergers, and outsource different stages of pharmaceutical R&D activities for a faster and cost minimizing method of innovation. Pharmaceutical companies outsource R&D activities to independent small biotech or pharmaceutical companies that specialize in different stages of pharmaceutical R&D. This chapter examines the determinants of the payment structure of research contracts between large bio/pharmaceutical companies and specialized research firms. Determinants of R&D contracts are analyzed using detailed R&D contract data between bio/pharmaceutical companies and independent research firms for 10 years. A multinomial logit model is used in order to understand the determinants of three different types of contracts; royalty contracts, fixed payment contracts, and the mixed contracts. Under uncertainty, the likelihood of a royalty contract rises for the early stages of the research and with the patent stock of the research firm. It is more likely to observe both royalty and fixed payment if the pharmaceutical client has past contracts with the same research firm. The results also suggest that if Food and Drug Administration (FDA) is more stringent in any disease area in reviewing the new drug application, then the likelihood of signing pure royalty contract decreases. Understanding the nature of R&D contracts and the effects of FDA's behavior on the pharmaceutical R&D contract is important because these contracts not only affect the cost of new drug invention but also the quality and the rate of invention. VALUE: Results are useful for both the pharmaceutical companies and the economic/business researchers.

  19. Research project on “A Study in Urban Air Pollution Improvement in Asia”

    OpenAIRE

    2017-01-01

    This final report of the joint research project “A study in urban air pollution improvement in Asia” is submitted by the Asian Institute of Technology (AIT) on behalf of the project team following the contract between AIT and the Japan International Cooperation Agency (JICA) for the project period of March 2015 - December 2017. Technical support is provided by the Asia Center for Air Pollution Research (ACAP) Japan and the operational support is provided by the Pollution Control Department (P...

  20. Fossil Energy Program report, 1 October 1976--30 September 1977. [Objectives, progress and plans for each contract or project

    Energy Technology Data Exchange (ETDEWEB)

    Dunning, H. Neal; Batchelor, James; Crim, Winfred; Furlong, Leroy; Harvie, Robert; Hunter, Juanita; Jones, William; Karnes, Anita; Ludwig, Linda; Miller, C. Lowell; Mills, G. Alex; Sacks, Stephen; Watkins, J. Wade; Watson, Coni; Weaver, Val

    1978-08-01

    This report is an integral part of the documentation system of the Fossil Energy Program of the Department of Energy. It contains descriptions of each contract and project, arranged in conformance with planning and budgetary documents. The results of contracts are reported at various intervals, depending on the type of contract, but at least annually. These reports are not listed individually in the ''Publications'' sections but are available from the National Technical Information Service, U.S. Department of Commerce, Springfield, Virginia 22161. The Department of Energy also publishes several abstract journals: Fossil Energy Update, Energy Research Abstracts, and Energy Abstracts for Policy Analysis.

  1. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  2. Flexibility in PPP contracts : Dealing with potential change in the pre-contract phase of a construction project

    NARCIS (Netherlands)

    Demirel, H.C.; Leendertse, W.L.; Volker, L.; Hertogh, M.J.C.M.

    2016-01-01

    Public Private Partnerships (PPPs) cover a range of possible relationships between public and private parties. PPP contracts are typically used in contexts of great uncertainty, such as large construction and infrastructure projects that are realized over a longer period of time. Hence, a major

  3. IAEA research contracts. Fifth annual report

    International Nuclear Information System (INIS)

    1965-01-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  4. IAEA research contracts. Fifth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-04-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  5. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Science.gov (United States)

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  6. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  7. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  8. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  9. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  10. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  11. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  12. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  13. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  14. 21 CFR 312.52 - Transfer of obligations to a contract research organization.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Transfer of obligations to a contract research... and Investigators § 312.52 Transfer of obligations to a contract research organization. (a) A sponsor may transfer responsibility for any or all of the obligations set forth in this part to a contract...

  15. DOE's foreign research reactor transportation services contract: Perspective and experience

    International Nuclear Information System (INIS)

    Patterson, John

    1997-01-01

    DOE committed to low- and moderate-income countries participating in the foreign research reactor spent fuel returns program that the United States government would provide for the transportation of the spent fuel. In fulfillment of that commitment, DOE entered into transportation services contracts with qualified, private-sector firms. NAC will discuss its experience as a transportation services provider, including range of services available to the foreign reactors, advantages to DOE and to the foreign research reactors, access to contract services by high income countries and potential advantages, and experience with initial tasks performed under the contract. (author)

  16. Roles of contract research organizations in translational medicine

    Directory of Open Access Journals (Sweden)

    Mei-Shu Shih

    2015-04-01

    Full Text Available Transitional medicine/science is shifting the medical research paradigm from compound-based to evidence-based drug/device discovery. It is increasing interdisciplinary collaborations, enhancing usage of advanced technologies, and facilitating therapeutics reaching patients faster. The fundamental theme of evidence-based discovery is to apply what is revealed in preclinical experimentation and to bring the resulting safety and efficacy to clinics. In the medical fields, a contract research organization (CRO works like a hired agent who has corresponding knowledge and experience to conduct and complete tasks for a sponsor. The relationship is business, and the contract is for deliverables. The increasingly high volume of sponsored outsourcing work has made this for-profit business boom in the past decade. Location boundaries are being blurred under globalization in the sciences and cross-border regulatory reviews. Getting from bench to bedside is a winding road with many obstacles and high hurdles. Efficient teamwork becomes essential to materialize ideas and bring them to the market. The professionals within team communities include drug/device makers and CROs. It has become increasingly obvious that CROs play pivotal roles in the chain of discovery/design, developing product to market through in vitro, in vivo, and ex vivo testing during preclinical experimentations and clinical trials. Project management teams are responsible for nurturing the materialization in a collaborative manner and enhancing the productivity of the pipelines. CROs have many functional aspects and specialties, and no one organization is fully capable of serving, i.e., integrated services, with expertise in each step of the chain to the needs of a variety of sponsors. Instead of competition among the CROs themselves, the continuously expanding market demands can be shared by Expertise-Based Integrated Services among allied CROs, in contrast to the few large CROs

  17. Variations in government contract in Malaysia

    Directory of Open Access Journals (Sweden)

    Jaspal Singh Nachatar

    2010-12-01

    Full Text Available The complexity of construction works means that it is hardly possible to complete a project without changes to the plans or the construction process itself. There can only be a minority of contracts of any size in which the subject matter when completed is identical in every respect with what was contemplated at the outset. As such, variations are inevitable in even the best-planned contracts. This study is attempted to examine the ways a variation was formed in law and project, in finding out whether the Standard Form of Contract used in Malaysia particularly the government Public Works Department (PWD form has been utilized to the best level in variation cases. Additionally, this study examined the benefits of variations to parties in contract and also provides suggestions and assumptions in an effort to contribute solutions to issues and problem detected. The research methodology used in this study was an extensive review of relevant literature, case study, empirical questionnaires and structured interviews and general observations based on experience and surroundings. The academic study approach incorporated stages such as initial understanding, data and information gathering, analysis of data, findings and conclusion and general suggestions in the study. The major findings of this study, among others, revealed that the existences of variations are common in projects. The main cause of variations was due to client request because of inadequate project objectives for the designer to develop comprehensive design. Besides, the analysis pointed out that the government form of contract the Public Works Department (PWD 203/203A can help in overcoming projects with variation because of the clear defined procedure. This study also found that proper planning and coordination at tender stage can minimize the risk of ‘unwanted’ variations. In conclusion, this study recommended that future research should be done in design and build based contract

  18. Reengineering and health physics within the project Hanford management contract

    International Nuclear Information System (INIS)

    Atencio, E.M.

    1997-01-01

    The impending transition of the Hartford Site management and operations (M ampersand O) contract to a management and integrating (M ampersand I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the 're-engineering' of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M ampersand O to the M ampersand I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor's Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M ampersand I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved

  19. NASA Small Business Innovation Research Program. Composite List of Projects, 1983 to 1989

    Science.gov (United States)

    1990-01-01

    The NASA SBIR Composite List of Projects, 1983 to 1989, includes all projects that have been selected for support by the Small Business Innovation Research (SBIR) Program of NASA. The list describes 1232 Phase 1 and 510 Phase 2 contracts that had been awarded or were in negotiation for award in August 1990. The main body is organized alphabetically by name of the small businesses. Four indexes cross-reference the list. The objective of this listing is to provide information about the SBIR program to anyone concerned with NASA research and development activities.

  20. Effects of Contract Delivery Method on the LEED(trademark) Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006) (CD-ROM)

    National Research Council Canada - National Science Library

    Carpenter, Deanna S

    2005-01-01

    ...: 1 CD-ROM; 4 3/4 in.; 484 KB. ABSTRACT: This research study focused on determining the effects that the two major contract delivery methods had on the LEED score of projects over the design and construction time horizon...

  1. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  2. A report to Congress Nuclear Regulatory Research: Project descriptions for FY88

    International Nuclear Information System (INIS)

    1988-08-01

    This report has been written in response to a request of the United States Congress that the Nuclear Regulatory Commission prepare and submit to the Congress a summary description of its research projects. Commercial contracts and research efforts at the Department of Energy (DOE) laboratories are assigned a five-digit financial number (FIN). This report provides a project descriptions for each FIN number. The project descriptions are divided into five major sections called program areas. These areas are: integrity of reactor components, prevent damage to reactor cores, reactor containment safety, confirming safety of nuclear waste disposal, and resolving safety issues and developing regulations. An explanation of each program area is given in an overview at the beginning of each section

  3. Convergence Properties of Projection and Contraction Methods for Variational Inequality Problems

    International Nuclear Information System (INIS)

    Xiu, N.; Wang, C.; Zhang, J.

    2001-01-01

    In this paper we develop the convergence theory of a general class of projection and contraction algorithms (PC method), where an extended stepsize rule is used, for solving variational inequality (VI) problems. It is shown that, by defining a scaled projection residue, the PC method forces the sequence of the residues to zero. It is also shown that, by defining a projected function, the PC method forces the sequence of projected functions to zero. A consequence of this result is that if the PC method converges to a nondegenerate solution of the VI problem, then after a finite number of iterations, the optimal face is identified. Finally, we study local convergence behavior of the extragradient algorithm for solving the KKT system of the inequality constrained VI problem

  4. The 2004 activities and the workshop of the human resources development project in FNCA. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-08-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project there are two kinds of activity; in-workshop activity and Outside-of-workshop activity. The FNCA 2004 Workshop on HRD Project was held on October 4-7, 2004, in Kuala Lumpur, Malaysia. The Workshop was sponsored by the Ministry of Science and Technology Innovation (MOSTI) of Malaysia and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The Malaysian Institute for Nuclear Technology Research (MINT) and the Japan Atomic Energy Research Institute (JAERI) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The activities of HRD Project was presented in the Sixth Coordinators Meeting of FNCA was held on March 30 - April 1, 2005, in Tokyo, Japan. This report consists of presentation papers and materials at the FNCA 2004 Workshop, a review document of HRD Project for the Coordinators Meeting of FNCA, a letter of request from the Project Leader of Japan to the Project Leaders of the participating countries and theme of the country report as Outside-Workshop Activity. (author)

  5. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  6. Improved contraction schemes for projected entangled pair states

    Energy Technology Data Exchange (ETDEWEB)

    Lubasch, Michael; Cirac, Juan Ignacio; Banuls, Mari-Carmen [Max Planck Institute of Quantum Optics, Hans-Kopfermann-Strasse 1, 85748 Garching (Germany)

    2013-07-01

    Projected Entangled Pair States (PEPS) represent the natural generalization of Matrix Product States (MPS) in higher dimensions. The strength of MPS in the numerical simulation of 1D quantum many-body systems is well established, as they are the variational class of states underlying the Density Matrix Renormalization Group and the latter is nowadays considered numerically exact for systems comprising hundreds of quantum particles. In algorithms based on MPS or PEPS, the bond dimension D of the state determines the number of variational parameters and the computational cost. While bond dimensions on the order of hundreds and thousands are feasible with MPS, standard 2D PEPS algorithms are limited to values in the range 2 to 6 due to the much worse scaling of the computational cost with D. Recently, a new algorithm based on an alternative contraction has been proposed that reduces this cost significantly. It resorts to the single-layer picture where the contraction is done in ket and bra separately. We investigate the advantages and disadvantages of this algorithm which can be understood in terms of the PEPS's boundary approximation.

  7. Engineering and construction projects for oil and gas processing facilities: Contracting, uncertainty and the economics of information

    International Nuclear Information System (INIS)

    Berends, Kees

    2007-01-01

    The amount of oil and gas processing capacity required to meet demand during the next 20 years is more than twice the amount realised during the last decades. Engineering and Construction contractors (ECs) play a key role in the development and implementation of Large Engineering and Construction Projects (LECPs) for these facilities. We examine the characteristics of LECPs, demand and supply of the contracting market and the strategies traditionally adopted by owners to contract out the development and implementation of these projects to ECs. We demonstrate that these traditional strategies are not longer effective, in the current 'sellers market', to mitigate the oligopolistic economic inefficiencies. As the 'overheating' of the contracting market is expected to continue for a considerable period of time, alternative contracting strategies are required. Contract theory, particularly the economics of information on LECPs, indicates how alternative contracting strategies can be used to overcome economic inefficiencies. The effective use of these alternative strategies requires increased owner involvement and their effectiveness is contingent upon owner competency and ECs acting as the owner's agent rather than its adversary. This will require an organisational and behavioural change process for both owners and ECs

  8. ESO Signs Largest-Ever European Industrial Contract For Ground-Based Astronomy Project ALMA

    Science.gov (United States)

    2005-12-01

    ESO, the European Organisation for Astronomical Research in the Southern Hemisphere, announced today that it has signed a contract with the consortium led by Alcatel Alenia Space and composed also of European Industrial Engineering (Italy) and MT Aerospace (Germany), to supply 25 antennas for the Atacama Large Millimeter Array (ALMA) project, along with an option for another seven antennas. The contract, worth 147 million euros, covers the design, manufacture, transport and on-site integration of the antennas. It is the largest contract ever signed in ground-based astronomy in Europe. The ALMA antennas present difficult technical challenges, since the antenna surface accuracy must be within 25 microns, the pointing accuracy within 0.6 arc seconds, and the antennas must be able to be moved between various stations on the ALMA site. This is especially remarkable since the antennas will be located outdoor in all weather conditions, without any protection. Moreover, the ALMA antennas can be pointed directly at the Sun. ALMA will have a collecting area of more than 5,600 square meters, allowing for unprecedented measurements of extremely faint objects. The signing ceremony took place on December 6, 2005 at ESO Headquarters in Garching, Germany. "This contract represents a major milestone. It allows us to move forward, together with our American and Japanese colleagues, in this very ambitious and unique project," said ESO's Director General, Dr. Catherine Cesarsky. "By building ALMA, we are giving European astronomers access to the world's leading submillimetre facility at the beginning of the next decade, thereby fulfilling Europe's desire to play a major role in this field of fundamental research." Pascale Sourisse, Chairman and CEO of Alcatel Alenia Space, said: "We would like to thank ESO for trusting us to take on this new challenge. We are bringing to the table not only our recognized expertise in antenna development, but also our long-standing experience in

  9. Contract employment policy and research productivity of knowledge workers: An analysis of Spanish universities

    OpenAIRE

    Lafuente González, Esteban Miguel; Berbegal-Mirabent, Jasmina

    2017-01-01

    This article investigates how contract employment practices adopted by universities—fixed-term contracts and permanent contracts—impact research productivity measured in terms of publications in scholarly journals. The empirical application considers the Spanish public higher education system for the period 2002-2008. We report an inverse U-shaped relationship between the rate fixed-term contracts and the research productivity of Spanish universities. That is, contract policies based on fixed...

  10. Strategic urban projects in Amsterdam and New York : Incomplete contracts and good faith in different legal systems

    NARCIS (Netherlands)

    Van der Veen, M.; Korthals Altes, W.K.

    2009-01-01

    Contracts between local government and private investment agencies play an important role in strategic urban projects. Real estate cycles provide only a narrow window of opportunity within which to draft such contracts. A legal system should therefore not impede the possibility of reaching an

  11. United States private-sector physicians and pharmaceutical contract research: a qualitative study.

    Science.gov (United States)

    Fisher, Jill A; Kalbaugh, Corey A

    2012-01-01

    There have been dramatic increases over the past 20 years in the number of nonacademic, private-sector physicians who serve as principal investigators on US clinical trials sponsored by the pharmaceutical industry. However, there has been little research on the implications of these investigators' role in clinical investigation. Our objective was to study private-sector clinics involved in US pharmaceutical clinical trials to understand the contract research arrangements supporting drug development, and specifically how private-sector physicians engaged in contract research describe their professional identities. We conducted a qualitative study in 2003-2004 combining observation at 25 private-sector research organizations in the southwestern United States and 63 semi-structured interviews with physicians, research staff, and research participants at those clinics. We used grounded theory to analyze and interpret our data. The 11 private-sector physicians who participated in our study reported becoming principal investigators on industry clinical trials primarily because contract research provides an additional revenue stream. The physicians reported that they saw themselves as trial practitioners and as businesspeople rather than as scientists or researchers. Our findings suggest that in addition to having financial motivation to participate in contract research, these US private-sector physicians have a professional identity aligned with an industry-based approach to research ethics. The generalizability of these findings and whether they have changed in the intervening years should be addressed in future studies. Please see later in the article for the Editors' Summary.

  12. United States private-sector physicians and pharmaceutical contract research: a qualitative study.

    Directory of Open Access Journals (Sweden)

    Jill A Fisher

    Full Text Available There have been dramatic increases over the past 20 years in the number of nonacademic, private-sector physicians who serve as principal investigators on US clinical trials sponsored by the pharmaceutical industry. However, there has been little research on the implications of these investigators' role in clinical investigation. Our objective was to study private-sector clinics involved in US pharmaceutical clinical trials to understand the contract research arrangements supporting drug development, and specifically how private-sector physicians engaged in contract research describe their professional identities.We conducted a qualitative study in 2003-2004 combining observation at 25 private-sector research organizations in the southwestern United States and 63 semi-structured interviews with physicians, research staff, and research participants at those clinics. We used grounded theory to analyze and interpret our data. The 11 private-sector physicians who participated in our study reported becoming principal investigators on industry clinical trials primarily because contract research provides an additional revenue stream. The physicians reported that they saw themselves as trial practitioners and as businesspeople rather than as scientists or researchers.Our findings suggest that in addition to having financial motivation to participate in contract research, these US private-sector physicians have a professional identity aligned with an industry-based approach to research ethics. The generalizability of these findings and whether they have changed in the intervening years should be addressed in future studies. Please see later in the article for the Editors' Summary.

  13. The U.S. Public's Investment in Medical Research: An Evolving Social Contract.

    Science.gov (United States)

    Heinig, Stephen J; Dev, Anurupa; Bonham, Ann C

    2016-01-01

    Medical researchers and their institutions are operating under extraordinary financial stress. More than a decade after completion of the 5-year doubling of the National Institutes of Health budget, the medical research community must confront a significant loss in National Institutes of Health purchasing power and downward pressures in federal discretionary spending. In part, this trend results from a federal budget stalemate over the growth in entitlement programs, particularly spending on medical care. This article considers the changing nature of the federal investment in medical research and the potential for medical researchers and institutions conducting the full spectrum of research to improve health system performance and health equity. In our view, continued federal investments reflect an evolving social contract for research serving the public good; the term contract is used metaphorically to represent a figurative, implicit agreement between the scientific community and the public's representatives in government. Under this conceptual contract, the American people--who are ultimately the funders of research, research training and infrastructure--expect outcomes that lead to better health, security or other benefits. The evolving contract includes expectations for more accountability, transparency, sharing of results and resources, and better integration of research systems and cultures that used to take pride in boundaries and distinctions. We outline here some of the major movements of organizations realigning to social support, which are increasingly essential to sustain public investment in medical research. Copyright © 2016 Southern Society for Clinical Investigation. Published by Elsevier Inc. All rights reserved.

  14. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  15. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  16. Use of Federal Acquisition Regulation. Part 12. Contracts for Applied Research

    National Research Council Canada - National Science Library

    2001-01-01

    ...) Part 12, "Acquisition of Commercial Items,"contracts for acquiring applied research. Applied research involves the scientific efforts to translate basic research into solutions for broadly defined military needs...

  17. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  18. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  19. Listing of engineering research contract reports under the DREAM, AERD and ERDAF programs of the Research Branch, 1973-1988

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, B A; Thuns, A; Feldman, M

    1988-01-01

    To supplement in-house investigations, Agriculture Canada contracted out research in a number of programs including three which supported engineering work. This document lists the contracts awarded under the programs and provides reference citations of the contract reports. Reports are grouped by file number, scientific authority, author or contractor, and subject, and a subject index is also included. The three programs are: Development, Research and Evaluation in Agricultural Mechanization (DREAM), Agricultural Engineering Research and Development Program (AERD), and Energy Research and Development in Agriculture and Food (ERDAF). AERD, which replaced DREAM, has been terminated, but the ERDAF program is still continuing as of the date of this document.

  20. Research projects at the TRIGA-reactor Vienna

    International Nuclear Information System (INIS)

    Boeck, H.; Buchberger, T.; Buchtela, K.; Hammer, J.; Miksovsky, A.; Veider, A.; Weber, H.W.; Zugarek, G.

    1986-01-01

    In 1985 the thermalizing column was modified to a beam tube with a conical collimator for neutron radiography. A highly sophisticated sample and cassette changer will be constructed in the next months. The central channel of the thermal column is also used for neutron radiography especially for small objects. The four beam tubes of the TRIGA-reactor are intensively used for neutron spectroscopy, small angle scattering, neutron interferometry and investigations of magnetic structures with polarized neutrons. The neutron activation installation in the piecing beam tube is permanently used for various sample analysis using a ultrafast pneumatic transfer system. In addition to these experiments directly related to the TRIGA-reactor other research projects are carried out, some of them under an IAEA research contract which are mostly focused towards nuclear safeguards such as the magnetic scanning of power reactor fuel assemblies or the laser surveillance system of spent fuel pools. (author)

  1. Towards sustainable infrastructure development through integrated contracts : Experiences with inclusiveness in Dutch infrastructure projects

    NARCIS (Netherlands)

    Lenferink, Sander; Tillema, Taede; Arts, Jos

    Current complex society necessitates finding inclusive arrangements for delivering sustainable road infrastructure integrating design, construction and maintenance stages of the project lifecycle. In this article we investigate whether linking stages by integrated contracts can lead to more

  2. FACTORS INFLUENCING THE ACCURACY OF PRE-CONTRACT STAGE ESTIMATION OF FINAL CONTRACT PRICE IN NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Cong Ji

    2014-12-01

    Full Text Available Establishing and prioritising the factors that may influence the final contract price when responding to a call for tenders is crucial for proper risk analysis and reliable forecasting; it could make or mar the ability to achieve expected profit margin in an era of lump sum fixed price contracts where clients often contest variation claims. In New Zealand, these factors have not been researched; hence estimators rely only on judgement to ‘guess-estimate’ in their price forecasting. This study aimed to fill the knowledge gap by investigating the priority factors. 150 responses from professional members of the New Zealand Institute of Quantity Surveyors were analysed using multi-attribute method. Results showed thirty-seven factors which could influence the final contract price; the three most influential being poor tender documentation, complexity of design & construction, and completeness of project information. Other factors relating to project, client and contractor characteristics, design consultants and tendering conditions, estimating practice and external factors were reported. Concordance analysis indicated high level of agreement amongst survey participants in the rank-ordering of the relative importance of the identified factors. The findings could assist quantity surveyors to prepare more reliable contract price estimates at the pre-contract stage. It would also improve construction-stage cost control.

  3. IAEA Co-ordinated Research Program (CRP)

    International Nuclear Information System (INIS)

    Schrenk, M.

    2010-01-01

    The Coordinated Research Project is a topical collection of research agreements and contracts. The research contracts are awarded with financial support of about 10-20% of the total contract cost. Among the activities of the project is the organization of consultant group meetings and workshops involving several international experts and representatives of users and developers of border radiation monitoring equipment. The project also supports in coordinating the development of equipment and techniques for up-to-date border monitoring and in establishing of a process for providing nuclear forensics support to member states

  4. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  5. Collaborative Research: The Alphabetic Braille and Contracted Braille Study as an Example of Collaborative Research

    Science.gov (United States)

    Wormsley, Diane P.; Emerson, Robert Wall; Erin, Jane

    2011-01-01

    This article examines the Alphabetic Braille Contracted Braille Study in relation to the dimensions of collaborative research: extent, intensity, substance, heterogeneity, velocity, formality, and productivity. It also discusses the dimensions of financing research and researchers' attitudes. The overall consensus is that the study would not have…

  6. Global contract automation for E and P: project overview; Contrato global de automacao para E e P: visao geral do projeto

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Luiz Alberto Barbosa; Cintra, Paulo Cesar Vogel; Gaban, Allan Rodrigo Martins [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Corazza, Andre [Altus Sistemas de Automacao S.A., Sao Leopoldo, RS (Brazil)

    2012-07-01

    This paper aims to present a technical overview of Global Contract for Automation (CGA in Portuguese) for the segment of E and P (Exploration and Production) in Oil and Gas. This paper presents the theory of this type of contract showing the first contract of its kind in Brazil, ongoing for Pre-Salt FPSOs. The idea of using this contract as a reference is relate theory to practice. In the study is done an analysis of 'win-win' relationship in when performing pre-detailing and detail engineering, project development and automation directly with the manufacturer of the automation solution. The project herein includes automation and control of eight FPSOs (Float Production Storage and Offloading), to be produced in series. The system contracted in CGA consists of 12 systems and integrated sub-systems related to production process, fire and gas detection and emergency shutdown (shutdown). The eight FPSO have the same design, are replicas of a single project. The CGA has in its scope to interface simultaneously with different contractors: FEED project; hull constructor; construction and assembly of modules; integration of the FPSO and direct contracts with equipment suppliers. It will also be detail in this paper the scope of supply of subsystems equipment, pre-detail and detail engineering services, automation and control systems integration, consistency and testing of automation system and technical assistance for pre operation and operation of the FPSO. (author)

  7. University Research and Development Activities: The Federal Income Tax Consequences of Research Contracts, Research Subsidiaries and Joint Ventures.

    Science.gov (United States)

    Kertz, Consuelo Lauda; Hasson, James K., Jr.

    1986-01-01

    Features of the federal income tax law applying to income received from commercially funded university-based scientific research and development activities are discussed, including: industry-sponsored research contracts, separately incorporated entities, partnerships and joint ventures, subsidiaries and unrelated income consequences of…

  8. Development through science: The IAEA research contract programme

    International Nuclear Information System (INIS)

    Benson Wiltschegg, T.; Gillen, V.

    1991-01-01

    The IAEA strives to stimulate the growth of science in developing countries by assuring that the IAEA and the scientific communities of developed and developing countries share their knowledge and experience. If the assistance provided is well organized and in keeping with the needs of developing countries it can make the crucial difference in sustainable development. This booklet provides a survey of the historical development of the IAEA's Research Contract Programme and outlines the aims and achievements of selected Co-ordinated Research Programmes. A complete listing of Co-ordinated Research Programmes is provided

  9. Budget projections - 1991 through 1996 for research in high energy physics

    International Nuclear Information System (INIS)

    1991-05-01

    This research program in high energy physics is carried out under the general supervision of a committee which is composed of G.W. Brandenburg, G.J. Feldman, M.E. Franklin, R.J. Glauber, K. Kinoshita, F.M. Pipkin, K. Strauch, R. Wilson, and H. Yamamoto. Professor G.J. Feldman currently serves as chair of this committee. Dr. Brandenburg is the Director of the High Energy Physics Laboratory and administers the DOE high energy physics contract. In the fall of 1991 S. Mishra will join this committee. Harvard is planning to make one or two additional senior faculty appointments in experimental high energy physics over the next two years. The principal goals of the work described here are to carry out forefront programs in high energy physics research and to provide first rate educational opportunities for students. The experimental program supported through HEPL is carried out at the major accelerator centers in the world and addresses some of the most important questions in high energy physics. Harvard's educational efforts are concentrated in graduate education, where they are currently supporting thirteen research students. In addition, undergraduate students work in projects at HEPL during the academic year and over summers. These budget projections cover all of the Harvard based high energy physics experimental activities. The open-quotes umbrellaclose quotes nature of this contract greatly simplifies support of essential central technical and computer services and helps the group to take advantage of new physics opportunities and to respond to unexpected needs. The funding for the operation of the HEPL facility is shared proportionally by the experimental groups. Harvard financially supports this high energy physics research program in many ways

  10. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Research and Development Contracting (SF 298). 53.235 Section 53.235 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development...

  11. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  12. Analysis of Air Force Wartime Contracted Construction Project Performance

    Science.gov (United States)

    2015-03-26

    KPIs ) identified in current literature. Chan’s meta-analysis of KPIs found that time and cost are the primary objective indicators of a successful...Smith, Currie & Hancock, 2009). 46 Key performance indicators ( KPI ) were also used as input factors to analyze differences between contracts...Chan, et al. (2002) performed a meta-analysis of KPIs , as determined by construction researchers. They found that the most predictive performance

  13. Multi-scale analysis of deformation behavior at SCC crack tip (2). (Contract research)

    International Nuclear Information System (INIS)

    Kaji, Yoshiyuki; Miwa, Yukio; Tsukada, Takashi; Hayakawa, Masao; Nagashima, Nobuo

    2007-03-01

    This report describes a result of the research conducted by the Japan Atomic Energy Agency and the National Institute for Materials Science under contract with Japan Nuclear Energy Safety Organization (JNES) that was concerned with a multi-scale analysis of plastic deformation behavior at the crack tip of stress corrosion cracking (SCC). The research was carried out to evaluate the validity of the SCC growth data acquired in the intergranular SCC (IGSCC) project based on a mechanistic understanding of SCC. For the purpose, in this research, analyses of the plastic deformation behavior and microstructure around the crack tip were performed in a nano-order scale. The hardness measured in nano, meso and macro scales was employed as a common index of the strength, and the essential data necessary to understand the SCC propagation behavior were acquired and analyzed that are mainly a size of plastic deformation region and a microstructural information in the region, e.g. data of crystallografy, microscopic deformation and dislocations at the inside of grains and grain boundaries. In this year, we analyzed the state of plastic deformation region at the crack tip of IGSCC under various conditions and investigated relationship between crack growth behavior and stress intensity factor. Especially, we investigated in detail about two different hardened specimens used in the SCC growth tests in the IGSCC project. (J.P.N.)

  14. NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

    Science.gov (United States)

    Wilson, Scott D.; Wong, Wayne A.

    2015-01-01

    A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

  15. A Study of sensory and nutritional quality of virgin olive oil. Presentation of a European project of research

    Directory of Open Access Journals (Sweden)

    Esposito, Giovanni

    1994-04-01

    Full Text Available The purpose of this paper is to present, in a synthesis, the objectives and means of the FLAIR project on olive oil quality (FLAIR proposal N.- 89041, contract N° AGRF - GT91 - 0046. Comments are reported on the scientific assumptions and practical problems that have motivated this research. The participants are also presented with their roles and tasks in the project.

  16. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  17. Contracting out maintenance and a plan for future research

    NARCIS (Netherlands)

    Martin, H.H.

    1997-01-01

    Presents a discussion of the research survey carried out at the Faculty of Technology Management at the Eindhoven University of Technology concerning contractors’ maintenance. First, gives a brief introduction to the emerging contracting out phenomenon in The Netherlands. Then, provides an overview

  18. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  19. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  20. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    International Nuclear Information System (INIS)

    Felise, P.; Phillips, J.D.

    1994-01-01

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice

  1. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Felise, P.; Phillips, J.D.

    1994-10-17

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice.

  2. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  3. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  4. 48 CFR 227.7204 - Contracts under the Small Business Innovative Research Program.

    Science.gov (United States)

    2010-10-01

    ... Business Innovative Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovative Research Program. When contracting under the Small Business Innovative Research Program, follow the procedures at 227-7104. ...

  5. Into the Looking Glass: Psychological Contracts in Research Administration

    Science.gov (United States)

    Hicks, Melanie; Monroy-Paz, Jorge

    2015-01-01

    In a world of fast moving technology, pressure cooker work climates and stretched resources, productivity, employee engagement, and talent retention are critical to the success of any organization. Research administration offices are no exception. Psychological contract theory provides insightful illumination on reactions to these environments by…

  6. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  7. R and D contract management systems in the USA; Beikoku ni okeru R and D contract kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Outlined herein are the US Government's R and D contract management, which is considered to have greatly contributed to promotion of innovation in the USA. The procedures for the R and D contracts are managed through the mechanisms of the (government procurement), following the FAR (Federal Acquisition Regulations) that govern the government procurement rules. The procedural flow includes planning, public announcement of inviting the application documents, examination of the applications, negotiations, granting the fund, project management, suspension of the project and completion of the project. The audition sometimes takes several years to complete. The staff managing the individual contract is fairly specialized, and a team consisting of several professionals is responsible for each project. The substantial lifetime training systems the contract officers can receive are established. The alternative contract system encourages the applications from consortiums, and private enterprises frequently tie up with academic organizations to apply for the funds. Granting the funds to consortiums have many advantages, e.g., cost sharing and technological transfer. (NEDO)

  8. Review of the research contract programs in the field of nuclear science and technology (1959-1979)

    Energy Technology Data Exchange (ETDEWEB)

    Bonoan, L S; Marasigan, C J; Relunia, E D [Philippine Atomic Energy Commission, Diliman, Quezon City

    1982-01-01

    This paper presents the 20 year span of cooperative services in the form of research contracts availed of by the country with the International Atomic Energy Agency (IAEA). All research contract grants are placed under the direct supervision of educational institutions, industrial laboratories, research centers and other institutions on areas of direct interest of the Agency's work. These areas are generally in the field of: life sciences with emphasis on medical and agricultural applications, radiation biology; nuclear safety; environmental protection; physical sciences such as physics and chemistry; engineering and technology, with special emphasis on nuclear power. Tables and figures graphically present research contracts grants and field classification.

  9. Multi-scale analysis of deformation behavior at SCC crack tip (3) (Contract research)

    International Nuclear Information System (INIS)

    Kaji, Yoshiyuki; Miwa, Yukio; Tsukada, Takashi; Hayakawa, Masao; Nagashima, Nobuo

    2008-08-01

    In recent years, incidents of the stress corrosion cracking (SCC) were frequently reported that occurred to the various components of domestic boiling water reactors (BWR), and the cause investigation and measure become the present important issue. By the Japan nuclear energy safety organization (JNES), a research project on the intergranular SCC (IGSCC) in nuclear grade stainless steels (henceforth, IGSCC project) is under enforcement from a point of view to secure safety and reliability of BWR, and SCC growth data of low carbon stainless steels are being accumulated for the weld part or the work-hardened region adjacent to the weld metal. In the project, it has been an important subject to guarantee the validity of accumulated SCC data. At a crack tip of SCC in compact tension (CT) type specimen used for the SCC propagation test, a macroscopic plastic region is formed where heterogeneity of microstructure developed by microscopic sliding and dislocations is observed. However, there is little quantitative information on the plastic region, and therefore, to assess the data of macroscopic SCC growth rate and the validity of propagation test method, it is essentially required to investigate the plastic region at the crack tip in detail from a microscopic viewpoint. This report describes a result of the research conducted by the Japan Atomic Energy Agency and the National Institute for Materials Science under contract with JNES that was concerned with a multi-scale analysis of plastic deformation behavior at the crack tip of SCC. The research was carried out to evaluate the validity of the SCC growth data acquired in the IGSCC project based on a mechanistic understanding of SCC. For the purpose, in this research, analyses of the plastic deformation behavior and microstructure around the crack tip were performed in a nano-order scale. The hardness measured in nano, meso and macro scales was employed as a common index of the strength, and the essential data necessary

  10. Emerging trends in contract research industry in India.

    Science.gov (United States)

    Drabu, Sushma; Gupta, Alka; Bhadauria, Anupama

    2010-09-01

    A Contract Research Organization (CRO) is a service organization that provides support to the pharmaceutical industry and offers a wide range of "outsourced" pharmaceutical research services to aid in R&D process and is thus an essential tool for undertaking clinical trials in the present scenario when high stakes are involved in the drug discovery process. This industry also offers a safe option of investment as the industry is largely recession-proof, with a significant upscale growth. Presently India occupies a very small pie of the global market share in the Clinical Trials Industry but it is estimated to conduct nearly 5% of global clinical trials by 2012. The global CRO industry valued $18 bn in 2008 and the market is expected to grow at an annual rate of 14% between 2009 and 13. Top multinational pharmaceuticals companies are venturing into the Indian business, in collaboration with the Indian Drug Companies. According to a recent study by Mckinsey & Company, the Indian Clinical Research Industry can attract $1.5 bn of revenue from US and EU by 2010. Such an increase in outsourcing from the western countries has led the global pharma companies and Indian entrepreneurs to set up Contract Research Organizations (CROs) in India. To bring this into realization and fulfil the market demand, while simultaneously aiding in improving the country's economical standards and market position, joint and well-coordinated efforts on part of the government, industry, and working professionals are needed in terms of regulatory affairs, audits, transparency in work affairs, garnering patient confidence, and pharmacovigilance. Copyright 2010 Elsevier Inc. All rights reserved.

  11. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  12. National register of research projects

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    This Register is intended to serve as a source of information on research which is being conducted in all fields (both natural and human sciences) in the Republic of South Africa. New research projects commenced during 1983 or 1984, and significantly changed research projects, as well as project that were completed or terminated during this period, on which information was received by the compilers before December 1984, are included, with the exception of confidential projects.

  13. INDEFINITE CONTRACT REVIEW 1999 Procedure for Research Physicists (Professional Category 1)

    CERN Multimedia

    1999-01-01

    In view of the long-standing deliberate turnover policy of professional category 1 research physicists on fixed-term contracts, a special procedure is defined, distinct from the other professional categories. This procedure takes into account that research physicists stay at CERN for only up to 6 years and that periods of service as Fellow may be counted within these six years.The following procedure has been agreed:1.\tThe review covers research physicists holding fixed-term contracts and having completed at least 4 years of service on 30 June 1999. Prior years as Fellow may be taken into consideration in the specific context.\tAll candidates are informed individually.2.\tThe files of all candidates are considered by search committees. The members of the committees are nominated by the Director-General and comprise members of the senior CERN staff as well as at least one senior external physicist. The committees are free to take up references and to interview the candidates.3.\tIn ord...

  14. Capital budgeting under relational contracting: optimal ranking and duration criteria for schemes of concession, project-financing and public-private partnership

    OpenAIRE

    Biondi, Yuri

    2009-01-01

    International audience; Project-financing and public-private partnership schemes are joint projects of investment that are generally submitted to investment valuation criteria based on compound discounting. However, the theoretical basis of these criteria is at issue nowadays. According to recent studies on relational contracting economics and behavioral finance, joint projects of investment can be considered as special relational environments where the project's returns improve on alternativ...

  15. 48 CFR 227.7107-2 - Contracts for construction supplies and research and development work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contracts for construction supplies and research and development work. 227.7107-2 Section 227.7107-2 Federal Acquisition Regulations... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-2 Contracts for construction supplies and...

  16. Legal issues in power sale contract negotiations

    International Nuclear Information System (INIS)

    Goodwin, L.M.

    1990-01-01

    The Public Utility Regulatory Policies Act of 1978 (PURPA) is the foundation of the cogeneration industry. However, few cogeneration projects could be financed on the basis of PURPA alone. PURPA guarantees project owners the right to sell power at the purchasing utility's Avoided Cost, whatever that may be from time to time. However, the development and financing of a cogeneration project requires a secure and dependable income stream, not a mere guarantee of the right to receive the spot price for power. Accordingly, developers have found that a formal power sale contract with the purchasing utility is a prerequisite to successful project development. This paper summarizes some current issues in power sale contract negotiation, with a particular emphasis on contract terms which shift risks from the utility and its ratepayers to the developer. Many of these trends originally appeared before the advent of competitive bidding systems, but most will continue to affect power sale contracts under competitive bidding, and under IPP project development as well

  17. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  18. Participation of INR to the research project initiated by the CANDU Owners Group - Canada

    International Nuclear Information System (INIS)

    Roth, Maria; Ciocanescu, Marin; Gheorghiu, C-tin; Ohai, Dumitru; Visinescu, Doru; Ionescu, Silviu; Man, Ion; Pitigoi, Vasile; Anghel, Dumitru; Uta, Octavian

    2004-01-01

    Having in view the participation of the INR's Nuclear Materials and Corrosion Departments together with Chalk River Laboratories, AECL, and other nine well known institutes, to the Research Project coordinated by the International Atomic Energy Agency - Vienna and the results obtained as well, the CANDU Owners Group (COG) - Canada has proposed an economical contract to INR - Pitesti, called the DHC Project. The goal of this project was the investigation of the slow cracking in the hydration state (Delayed Hydride Cracking phenomenon) of the pressure tubes in CANDU reactors. There were determined, in specific conditions, the DHC rate, V DHC , and threshold factor of triggering the phenomenon K HI (the factor of stress intensity in the crack) occurring in un-irradiated Zr-2.5%Nb alloy. Further extensions of the project to irradiated alloys of the pressure tubes used in CANDU reactors, provided by the Canadian partner, are planned. This paper gives an overview covering the contributions of the INR's departments to the contract provisions for the current year as concluded with COG - Canada. It is described the design and execution activity of a device for processing the samples subject to testing, the mounting of the measuring chain, developing of a system for monitoring the testing parameters, the acquisition and automated processing of experimental data up to constituting the final report. The testing report was appreciated by the COG and recognized as demonstrating the INR's capability to fulfil the tasks of the DHC Project and so opened the way to further cooperation

  19. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  20. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  1. Student Research Projects

    Science.gov (United States)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  2. 24 CFR 983.203 - HAP contract information.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  3. A FRAMEWORK FOR SUBCONTRACTOR INTEGRATION IN ALLIANCE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Vilasini, Nimesha

    2012-04-01

    Full Text Available Project alliancing involves the active collaboration of construction project owners and non-owner participants (designer, contractors, and suppliers to deliver projects in an atmosphere of shared responsibilities and liabilities. Alliancing connotes integration but in real practice, it fails to create a true alliance environment since only part of the value chain (owner, designer, main contractor is considered for integration. Consequently subcontractors are very often left out of the key alliance. Therefore this study identifies improvement areas to current alliance practice and suggests changes that will permit critical sub-contracting processes to be integrated into a project’s main alliance. To achieve this objective the research follows a comparative study approach. Information obtained from relevant literature is used to identify current subcontractor management practices and best practices for subcontractor integration in alliances. A case study of an alliance project is used to identify improvement areas in subcontractor management practices in an alliance environment. From these findings, the study proposes a revised alliance framework that integrates subcontractors from the early stages in alliance contracts, thus enabling the realisation of benefits accruable to projects through early contractor involvement.

  4. Experimental Plasma Research project summaries

    International Nuclear Information System (INIS)

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  5. Experimental Plasma Research project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report.

  6. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  7. An Optional Instrument for European Insurance Contract Law

    OpenAIRE

    Mandeep Lakhan; Helmut Heiss

    2010-01-01

    The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law) network, drafting a specific part of the Common Fr...

  8. Smart Contract Templates: foundations, design landscape and research directions

    OpenAIRE

    Clack, Christopher D.; Bakshi, Vikram A.; Braine, Lee

    2016-01-01

    In this position paper, we consider some foundational topics regarding smart contracts (such as terminology, automation, enforceability, and semantics) and define a smart contract as an automatable and enforceable agreement. We explore a simple semantic framework for smart contracts, covering both operational and non-operational aspects, and describe templates and agreements for legally-enforceable smart contracts, based on legal documents. Building upon the Ricardian Contract, we identify op...

  9. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1978-08-01

    This report contans descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Measurements and Instrumentation; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  10. Radiation protection research projects. Programme report 2013. Summary of results from recent research projects of the BMU's Applied Research Programme carried out under the responsibility of the German Office of Radiation Protection (BfS); Strahlenschutzforschung. Programmreport 2013. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz, Bau und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Schmitt-Hannig, Annemarie; Goedde, Ralph; Loebke-Reinl, Angelika; Hachenberger, Claudia; Trugenberger-Schnabel, Angela (comps.)

    2014-09-15

    On behalf of the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. Planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects are tasks of the Federal Office for Radiation Protection. This report provides information on preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMUB's Environmental Research Plan for the year 2013.

  11. Radiation protection research projects. Programme report 2010. Summary of results from recent research projects of the BMU's Applied Research Programme carried out under the responsibility of the German Office of Radiation Protection (BfS); Strahlenschutzforschung. Programmreport 2010. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Bernhard-Stroel, Claudia; Goedde, Ralph; Hachenberger, Claudia; Loebke-Reinl, Angelika; Schmitt-Hannig, Annemarie

    2011-11-15

    On behalf of the Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. Planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects are tasks of the Federal Office for Radiation Protection. This report provides information on preliminary and, where applicable, final results (in the form of status reports) of radiation protection projects within the BMU's Environmental Research Plan for the year 2010. (orig.)

  12. Radiation protection research projects. Programme report 2012. Summary of results from recent research projects of the BMU's Applied Research Programme carried out under the responsibility of the German Office of Radiation Protection (BfS); Strahlenschutzforschung. Programmreport 2012. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Bernhard-Stroel, Claudia; Goedde, Ralph; Hachenberger, Claudia; Loebke-Reinl, Angelika; Schmitt-Hannig, Annemarie; Trugenberger-Schnabel, Angela

    2013-12-15

    On behalf of the Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. Planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects are tasks of the Federal Office for Radiation Protection. This report provides information on preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMU's Environmental Research Plan for the year 2012.

  13. STUK research projects 1998-2000

    International Nuclear Information System (INIS)

    Salomaa, S.; Eloranta, E.; Heimbuerger, H.; Jokela, K.; Jaervinen, H.

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK's own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK's own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK's research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (orig.)

  14. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  15. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  16. Project Swiftsure final report: Destruction of chemical agent waste at Defence Research Establishment Suffield. Special publication

    Energy Technology Data Exchange (ETDEWEB)

    McAndless, J.M.

    1994-04-01

    Project Swiftsure describes a three-year project at the Defence Research Establishment Suffield to safely destroy stockpiles of mustard lewisite, nerve agents and decontaminate scrap material which was stored on the DRES Experimental Proving Ground. Using both in-house and contracted resources, the agent waste was destroyed by chemical neutralization or incineration. With the exception of the arsenic byproducts from the lewisite neutralization process, all secondary waste generated by chemical neutralization was incinerated. Mustard in different forms was thermally destroyed using a transportable incinerator of commercial design. Extensive environmental monitoring and public consultation programs were conducted during the project. Results of the monitoring programs verified that the chemical warfare agents were destroyed in a safe, environmentally-responsible manner. jg p.329.

  17. Performance-based contracts for road projects comparative analysis of different types

    CERN Document Server

    Gajurel, Ashish

    2014-01-01

    This book focuses on the aspects of contracting contracts, basically related to road construction and management contracts. The book presents an analytical study of Performance-Based Road Management and Maintenance (PMMR), Funktionsbauvertrag (FBV) (Function-Based Construction Contract) and Public Private Partnerships (PPP). A separate chapter is also included about the comparative study of these contract types. The book provides useful material for university libraries, construction companies and government departments of construction.

  18. 48 CFR 227.7104 - Contracts under the Small Business Innovation Research (SBIR) Program.

    Science.gov (United States)

    2010-10-01

    ... Business Innovation Research (SBIR) Program. 227.7104 Section 227.7104 Federal Acquisition Regulations... Data and Computer Software—Small Business Innovation Research (SBIR) Program, when technical data or... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7104 Contracts under the Small Business...

  19. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  20. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  1. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  2. The importance of project networking for the replacement research reactor

    International Nuclear Information System (INIS)

    Whitbourn, G.

    2003-01-01

    When the HIFAR research reactor was commissioned in 1958 it was both constructed and regulated by the then Australian Atomic Energy Commission. The situation now is much more complicated, with an independent regulator, The Australian Radiation Protection and Nuclear Safety Agency (ARPANSA) and oversight by national security agencies and the Australian Safeguards and Non proliferation Organisation (ASNO). In July 2000 ANSTO contracted INVAP SE a suitably qualified and experienced nuclear organisation based in Argentina to provide the Replacement Research Reactor (RRR). INVAP subcontracted an Australian entity, a joint venture between John Holland and Evans Deakin Industries (JHEDI) to provide resources in Australia. There is an international network of over 100 subcontractors providing services, products and materials to INVAP and JHEDI and a significant number of contractors providing project support services to ANSTO. The interaction of all these entities to provide the RRR is a significant networking challenge, involving a complex network of legal, contractual and functional relationships and communication processes

  3. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  4. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  5. Coordinated research projects (CRP). Coordinated research project (CRP)

    International Nuclear Information System (INIS)

    Takagi, Hidekazu; Koike, Fumihiro; Nakamura, Nobuyuki

    2013-01-01

    In the present paper, the contribution of Japanese scientists in coordinated research projects on thermonuclear fusion. Representative subjects taken in seven projects are the precise computation of theoretical data on electron-molecule collisions in the peripheral plasma, the computation of spectroscopic data of multi-charged tungsten ions, the spectroscopic measurement of multi-charged tungsten ions using an ion trap device, the development of collisional-radiative model for plasmas including hydrogen and helium, the computational and theoretical studies on the behavior of tungsten and beryllium in the plasma-wall interaction, the study on the property of dusts generated in fusion devices. These subjects are those of most important issues in ITER. (author)

  6. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  7. The Construction of Academic Time: Sub/Contracting Academic Labour in Research.

    Science.gov (United States)

    Hey, Valerie

    2001-01-01

    Offers a poststructuralist analysis of the UK higher education sector's academic division of labor, exploring some new contradictions from a contract researcher's standpoint. Raises political, social, and methodological questions about these divisions by exploring their class and gender dimensions. Too many academics remain silent about adverse…

  8. Budget projections 1990, 1991, and 1992 for research in high energy nuclear physics

    International Nuclear Information System (INIS)

    1990-05-01

    Research programs in experimental high energy physics are carried out at Harvard under the general supervision of a departmental faculty committee on high energy physics. The committee members are: G.W. Brandenburg, M. Franklin, S. Geer, R. J. Glauber, K. Kinoshita, F. M. Pipkin, R. F. Schwitters, K. Strauch, M. E. Law, and R. Wilson. Of these individuals, Professors R.J. Glauber, F.M. Pipkin, R.F.Schwitters, K. Strauch, and R. Wilson are the principal investigators with whom a number of junior faculty members and post-doctoral research fellows are associated. Dr. Brandenburg is the Director of the High Energy Physics Laboratory and administers the DOE high energy physics contract. Professor Schwitters is currently on leave of absence as Director of the Superconducting Super Collider project. In the fall of 1990 Professor G. Feldman, who is currently at SLAC, will join the Harvard faculty and become a principal investigator. Harvard is planning to make one or two additional senior faculty appointments in experimental high energy physics over the next two years. The principal goals of the work described here are to carry out forefront programs in high energy physics research and to provide first rate educational opportunities for students. The experimental program supported through HEPL is carried out at the major accelerator centers in the world and addresses some of the most important questions in high energy physics. Harvard's educational efforts are concentrated in graduate education. These budget projections cover all of the Harvard based high energy physics experimental activities. The open-quotes umbrellaclose quotes nature of this contract greatly simplifies support of essential central technical and computer services and helps the group to take advantage of new physics opportunities and to respond to unexpected needs. The funding for the operation of the HEPL facility is shared equally by the experimental groups

  9. Solar Market Research and Analysis Projects | Solar Research | NREL

    Science.gov (United States)

    Market Research and Analysis Projects Solar Market Research and Analysis Projects Solar market research and analysis efforts at NREL seek to further solar technologies' role in supporting a more . Midscale Commercial Market Solar Analysis NREL experts are providing analysis to expand the midscale solar

  10. Principles of European Contract Law

    DEFF Research Database (Denmark)

    Lando, Ole; Beale, Hugh

    This text provides a comprehensive guide to the principles of European contract law. They have been drawn up by an independent body of experts from each Member State of the EU, under a project supported by the European Commission and many other organizations. The principles are stated in the form...... of articles, with a detailed commentary explaining the purpose and operation of each article and its relation to the remainder. Each article also has extensive comparative notes surveying the national laws and other international provisions on the topic. "The Principles of European Contract Law Parts I &...... in developing a common European legal culture. The European Parliament has twice called for the creation of a European Civil Code. The principles of European contract law are essential steps in these projects. This text provides a comprehensive guide to the Principles of European contract law. They have been...

  11. Big-pharmaceuticalisation: clinical trials and Contract Research Organisations in India.

    Science.gov (United States)

    Sariola, Salla; Ravindran, Deapica; Kumar, Anand; Jeffery, Roger

    2015-04-01

    The World Trade Organisation's Trade Related Intellectual Property Rights [TRIPS] agreement aimed to harmonise intellectual property rights and patent protection globally. In India, the signing of this agreement resulted in a sharp increase in clinical trials since 2005. The Indian government, along with larger Indian pharmaceutical companies, believed that they could change existing commercial research cultures through the promotion of basic research as well as attracting international clinical trials, and thus create an international level, innovation-based drug industry. The effects of the growth of these outsourced and off-shored clinical trials on local commercial knowledge production in India are still unclear. What has been the impact of the increasing scale and commercialisation of clinical research on corporate science in India? In this paper we describe Big-pharmaceuticalisation in India, whereby the local pharmaceutical industry is moving from generic manufacturing to innovative research. Using conceptual frameworks of pharmaceuticalisation and innovation, this paper analyses data from research conducted in 2010-2012 and describes how Contract Research Organisations (CROs) enable outsourcing of randomised control trials to India. Focussing on twenty-five semi-structured interviews CRO staff, we chart the changes in Indian pharmaceutical industry, and implications for local research cultures. We use Big-pharmaceuticalisation to extend the notion of pharmaceuticalisation to describe the spread of pharmaceutical research globally and illustrate how TRIPS has encouraged a concentration of capital in India, with large companies gaining increasing market share and using their market power to rewrite regulations and introduce new regulatory practices in their own interest. Contract Research Organisations, with relevant, new, epistemic skills and capacities, are both manifestations of the changes in commercial research cultures, as well as the vehicles to

  12. 24 CFR 983.202 - Purpose of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Purpose of HAP contract. 983.202... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.202 Purpose of HAP contract. (a) Requirement. The PHA must enter into a HAP contract with the owner. The HAP contract must be...

  13. 32 CFR 3.9 - Follow-on production contracts.

    Science.gov (United States)

    2010-07-01

    ...) Use competition to select parties for participation in the OT prototype agreement and evaluate the... THAN CONTRACTS, GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.9 Follow-on production contracts. (a) Authority. A competitively awarded OT agreement for a prototype project that satisfies the...

  14. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  15. Project Summaries: Office of Basic Research Contract Program, 1989-1991

    Science.gov (United States)

    1990-08-01

    United States Army Research Institute for the BAhavioral and Social Sciences Approved !or public release; distribution is unlimited U.S. ARMY RESEARCH...Soldiers’ evaluation of their leaders in World WarII and the All- Volunteer Force. 27 (N): Group Functioning and Communicative Processes (0...Fischer, G. & Stevens, C. (1987) Volunteering Information: Enhancing the Communication Capabilities of Knowledge-Based Systems, Proceedings of INTERACT

  16. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  17. Research projects of STUK 2000-2002

    International Nuclear Information System (INIS)

    Salomaa, S.

    2000-06-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2000 - 2002 summarises STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and the health effects of radiation. During 2000 - 2002, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research activities are now more international than ever; the institute is involved in about 20 research projects funded by EC. Apart from the European Union and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (author)

  18. Note on Deduction Theorems in contraction-free logics

    Czech Academy of Sciences Publication Activity Database

    Chvalovský, Karel; Cintula, Petr

    2012-01-01

    Roč. 58, č. 3 (2012), s. 236-243 ISSN 0942-5616 R&D Projects: GA ČR GAP202/10/1826 Grant - others:Austrian Science Fund (FWF)(AT) START Y544-N23 Institutional research plan: CEZ:AV0Z10300504 Keywords : Local Deduction Theorem * BCI-logic * Substructural logics * Rule of contraction Subject RIV: BA - General Mathematics Impact factor: 0.376, year: 2012

  19. Governance variety in the energy service contracting market

    Energy Technology Data Exchange (ETDEWEB)

    Ostertag, Katrin; Huelsmann, Friederike

    2008-07-01

    There is a surprisingly high variety of actors involved in the supply of energy service contracting arrangements. Based on an empirical record of approximately 2,500 contracting projects in the domain of space heating in Germany, the paper analyses specialisation patterns of contractors. An econometric model is used to test hypotheses derived from transaction cost economics, which contractor type should be expected for which kind of contracting project. According to our results, if physical, site and human asset specificity are high, governance modes are preferred, for which contracting represents a downward integration of business activities along the value-added chain. This includes the supply of contracting by municipal utilities. More specifically, municipal utilities occur as superior suppliers of contracting if combined heat and power is implemented, if the building served is connected to their gas grid and if it is a public building. This pattern could orient the development of contracting activities for utilities reconsidering their strategic position following the liberalisation of the electricity market. (orig.)

  20. Using Social Media for Research Dissemination: The Digital Research Video Project

    Directory of Open Access Journals (Sweden)

    Suzanne Pilaar Birch

    2013-09-01

    Full Text Available This article discusses the outcomes of the Digital Research Video Project, which was part of the larger Social Media Knowledge Exchange program at the Centre for Research in the Arts, Social Sciences, and Humanities (CRASSH at the University of Cambridge and funded by the Arts & Humanities Research Council (UK. The project was founded on the premise that open access publication of research, while important, does not necessarily make research accessible. Often, PhD students and post-doctoral scholars lack the skills needed to communicate their research to a broader audience. The goal of the project was, first, to provide communication training to early career researchers (achieved through a workshop held in autumn 2012 and second, to create illustrated videos highlighting projects by early career researchers that would help them engage with their work using multimedia and share their results with a larger audience. This article considers the methods of dissemination and impact of the project.

  1. Research projects of STUK 2000-2002

    Energy Technology Data Exchange (ETDEWEB)

    Salomaa, S. [ed.

    2000-06-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2000 - 2002 summarises STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and the health effects of radiation. During 2000 - 2002, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research activities are now more international than ever; the institute is involved in about 20 research projects funded by EC. Apart from the European Union and the Nordic countries, STUK's main partners are to be found in Russia, Estonia and the USA. (author)

  2. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  3. Software Support for Industrial Controls Contract

    CERN Document Server

    Sánchez-Corral, E

    2001-01-01

    The contract covers the development and the operation and maintenance (O&M) of the monitoring and control systems used for supervising CERN's technical infrastructure. The contract involves those responsible for equipment in any current or future technical installation. We are outsourcing a complex activity which will require efforts on both preparing the specifications for new projects and setting clear definitions of tasks and procedures for O&M. It is a result-oriented contract in which performance will be continually evaluated by different methods and tools: project management plan and project follow-up, and CAMMS (Computerised Assets and Maintenance Management system). To be used effectively, this approach requires complete traceability of activities and documentation of the systems. Based on the analysis of the results measured and the shared (CERN and contractor) experience, the O&M activities will be reviewed and reorganised and operational procedures will be changed according to needs. A ...

  4. 24 CFR 983.205 - Term of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 983.205... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.205 Term of HAP contract. (a) Ten-year initial term. The PHA may enter into a HAP contract with an owner for an initial...

  5. E-Commerce in Europe - Relevant Law when Concluding a Contract on the Internet

    Czech Academy of Sciences Publication Activity Database

    Matejka, Ján; Štědroň, B.

    2004-01-01

    Roč. 4, č. 1 (2004), s. 45-49 ISSN 1213-4678 R&D Projects: GA AV ČR KJB7068402 Institutional research plan: CEZ:AV0Z7068917 Keywords : e- commerce * contract law * information society Subject RIV: AG - Legal Sciences

  6. Relationship Contracting: The South Australian Experience - A Case Study

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available The construction industry has long been accusedof poor performance. The confrontational attitudeof its members and the resultant adversarial atmosphere has been identified as a major factor responsible for this poor performance. A cultural change is required to remove these barriers and to promote optimum project outcomes. Relationship contracting is promoted as a way to support the shift from the adversarial culture to the co-operative and collaborative culture within the industry and the project team.The Adelaide Convention Centre Extensions project was the first in South Australia to be procure und r the principles of relationship contract1ng. Usmg the case study approach, this paper reviews the form of relationship contracting used in this milestone project. The paper documents the lessons learned from this project and makes recommendations that can lead to improvements for future projects.

  7. Research projects of STUK 2003-2005

    International Nuclear Information System (INIS)

    Salomaa, S.

    2004-01-01

    The primary goal of STUK, Finnish Radiation and Nuclear Safety Authority, is to protect man, society, environment and future generations from the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation. STUK research projects 2003 - 2005 summarizes STUK's own research activities on radiation protection. In addition to these, STUK also supervises and funds research projects related to safety of nuclear energy, and nuclear waste and materials that are carried out in other research institutes. Information on the research projects and related publications is also available on STUK's WWW pages at www.stuk.fi. STUK's research focuses on radiation protection and health effects of radiation. During 2003 - 2005 the main emphasis will be on research supporting the Finnish national environmental health action plan, and projects concerning the health risks of radiation, nuclear emergency preparedness and protection of biota. EU directives on radiation protection and medical radiation exposure also influence the course taken by the research carried out at STUK. New research priorities also include studies on non-ionising radiation, especially the effects of mobile phone frequency radiation. STUK's research networks involve well over 100 national and international partners. During 2003 - 2005 STUK is actively participating in the 6th framework research programmes of EC

  8. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  9. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  10. 24 CFR 891.565 - Term of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 891.565... 8 Assistance § 891.565 Term of HAP contract. The term of the HAP contract for assisted units shall be 20 years. If the project is completed in stages, the term of the HAP contract for assisted units...

  11. The advantages of cost plus award fee contracts

    Science.gov (United States)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  12. Proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of an amendment to the blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments with the company SOURIAU (CH), for the next three years for up to 600 000 euros (954 600 Swiss francs), subject to revision for inflation from January 2007, bringing the total amount of the blanket purchase contract to a maximum amount of 1 200 000 euros (1 909 200 Swiss francs), subject to revision for inflation from January 2007. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/60/5/e

  13. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  14. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  15. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  16. Contract types - turnkey

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    Turnkey or the turnkey type of contract refers to a system of management according to which one organization accepts total responsibility for completing all parts and all phases of a project. In the case of a power project the turnkey contractor undertakes to design the plant, supply or procure and erect the equipment, build the station and put it into operation. (orig./FW) [de

  17. 77 FR 47797 - Federal Acquisition Regulation; Small Business Set Asides for Research and Development Contracts

    Science.gov (United States)

    2012-08-10

    ... Acquisition Regulation; Small Business Set Asides for Research and Development Contracts AGENCY: Department of... when the market research conducted in accordance with FAR part 10 indicates there are small businesses... officer can proceed with a small business set-aside for research and development. FAR 19.502-2(b...

  18. Mizunami Underground Research Project annual report in the 2002 fiscal year

    International Nuclear Information System (INIS)

    Ota, Kunio; Amano, Kenji; Kumazaki, Naoki

    2003-07-01

    The current geoscientific research of the Mizunami Underground Research Laboratory (MIU) Project have been carried out since the 1996 fiscal year at the Shobasama site in Akeyo-cho, Mizunami City, Gifu Prefecture. The main goals of the MIU Project are to establish appropriate methodologies for reliably investigating and assessing a deep subsurface, and to develop a range of engineering techniques for deep underground application in granite. This site for MIU construction was changed in January 2002, from the Shobasama site to city-owned land (MIU Construction Site) after lease contract with Mizunami city. The surface-based investigations at the MIU Construction site have started since February 2002. In 2002 fiscal year, geophysical survey and shallow borehole investigations were conducted and deep borehole investigations have started for modeling and characterization of geological environment in the MIU Construction Site before sinking the shafts. Detail of study and survey during the construction phase of MIU project was planned based on the layout and plan of construction of the underground facilities as one of the results of development of engineering technologies in a deep underground. In the Shobasama site, VSP survey was carried out to improve the model of geological environment. Hydrogeological model was calibrated using the results of long-term pumping test and long-term subsurface and groundwater monitoring. Important factors for hydrogeological modeling were evaluated as the results of numerical analysis by multiple approaches of groundwater flow modeling. The preliminary analysis based on the rock mechanical model at the Shobasama site was performed to estimate the deformation caused by excavation of the underground facilities. (author)

  19. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  20. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1982-10-01

    The experimental plasma Research Branch has responsibility for developing a broad range of experimental data and new experimental techniques that are required for operating and interpreting present large-scale confinement experiments, and for designing future deuterium-tritium burining facilities. The Branch pursued these objectives by supporting research in DOE laboratories, other Federal laboratories, other Federal laboratories, universities, and private industry. Initiation and renewal of research projects are primarily through submission of unsolicited proposals by these institutions to DOE. Summaries of these projects are given

  1. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  2. An O-"fish"-ial Research Project

    Science.gov (United States)

    Newman, James; Krustchinsky, Rick; Vanek, Karen; Nguyen, Kim-Thoa

    2009-01-01

    In this "O-"fish"-ial" research project, third-grade students use multiple resources to research several fish species, write a research paper and develop a PowerPoint presentation to communicate their findings. In addition, students actually examine these species up close with samples from the local market, and then conclude the project with a…

  3. Global Change Research: Summaries of research in FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This document describes the activities and products of the Global Research Program in FY 1993. This publication describes all of the projects funded by the Environmental Sciences Division of DOE under annual contracts, grants, and interagency agreements in FY 1993. Each description contains the project`s title; its 3-year funding history (in thousands of dollars); the period over which the funding applies; the name(s) of the principal investigator(s); the institution(s) conducting the projects; and the project`s objectives, products, approach, and results to date (for most projects older than 1 year). Project descriptions are categorized within the report according to program areas: climate modeling, quantitative links, global carbon cycle, vegetation research, ocean research, economics of global climate change, education, information and integration, and NIGEC. Within these categories, the descriptions are grouped alphabetically by principal investigator. Each program area is preceded by a brief text that defines the program area, states its goals and objectives, lists principal research questions, and identifies program managers.

  4. RESEARCH ON PROBLEMS WITH PROJECTS AND PARTNERSHIPS THAT PUBLIC INSTITUTIONS IN THE CENTRE REGION FACED IN ACCESSING EUROPEAN FUNDS

    Directory of Open Access Journals (Sweden)

    DUMITRASCU DANUT

    2012-12-01

    solve the identified problems. The qualitative research revealed the existence of some problems faced by institutions in relation to accessing and developing projects that focus on several directions: when filling out the application form, the technical-financial reporting, at the contracting phase of the projects, problems of partners. This article deals with the problems encountered during the projects’ contracting stage and problems caused by partners. The respondents’ answers place the problems of partners on top of the categories of problems that stood in the way of European funds’ beneficiaries. A series of causes that have led to the occurrence of these problems have also been identified. It should be stated that the information obtained from the conducted research supplies, theoretically speaking, the studied field and brings an important contribution not only to possible beneficiaries of European funds, but to the institutions managing European funds in Romania, who have a lot to learn from the experience of the first period of programmes. The authors’ main contribution is to integrate this study into the logical thread of the thesis entitled “Strategic management in European project funding”. Both articles, part of a research in the field of project management are unique and original and meet a current and pressing requirement of the Romanian society.

  5. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  6. Technology Base Research Project for electrochemical energy storage

    Science.gov (United States)

    Kinoshita, K.

    1985-06-01

    The DOE Electrochemical Energy Storage Program is divided into two projects: (1) the exploratory technology development and testing (ETD) project and (2) the technology base research (TBR) project. The role of the TBR Project is to perform supporting research for the advanced battery systems under development by the ETD Project, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the TBR Project is to identify the most promising electrochemical technologies and transfer them to industry and/or the ETD Project for further development and scale-up. This report summarizes the research, financial, and management activities relevant to the TBR Project in CY 1984. General problem areas addressed by the project include identification of new electrochemical couples for advanced batteries, determination of technical feasibility of the new couples, improvements in battery components and materials, establishment of engineering principles applicable to electrochemical energy storage and conversion, and the assessment of fuel-cell technology for transportation applications. Major emphasis is given to applied research which will lead to superior performance and lower life-cycle costs. The TBR Project is divided into three major project elements: exploratory research, applied science research, and air systems research.

  7. Energy R and D programme: energy conservation research. Survey of results (1975-1979) and compilation of selected new projects (1979-1983)

    Energy Technology Data Exchange (ETDEWEB)

    Zegers, P [ed.

    1981-01-01

    Results obtained in the European Communities Energy Conservation Research and Development (R and D) Program are presented. Energy Conservation R and D was executed in the following subsectors: improved insulation of buildings; use of heat pumps; urban transport; residual heat recovery; materials recycling; production of energy from waste; industrial processes; and storage of secondary energy. Summaries are presented for information gained from the research projects. Then, separate abstracts for all final reports (96), contract numbers, and the authors are given. (MCW)

  8. Research of Project Cost Management System Based on the Target Cost Contract%基于目标成本合同的工程项目成本管理体系研究

    Institute of Scientific and Technical Information of China (English)

    陈继光

    2016-01-01

    With the constant construction of social engineering, the theory and method of project management also have the rapid development in the process. And the mode of partners' relationships is more advocated. Among them, the target cost contract is a kind of relatively common partnership mode, it can help project contractor and owner to gain better economic benefits. This paper studies the engineering project cost management system of the target cost contract.%随着社会工程的不断建设,工程项目管理的理论以及方法也在此过程中得到了较为快速的发展,且更加倡导合作伙伴的关系模式.其中,目标成本合同则是一种较为常用的伙伴关系模式,能够帮助项目承包商以及业主更好的从中获得经济收益.在本文中,将就基于目标成本合同的工程项目成本管理体系进行一定的研究.

  9. Radiation research contracts: Biological effects of small radiation doses

    International Nuclear Information System (INIS)

    Hug, O.

    1959-01-01

    According to its Statute the IAEA has to fulfil a dual function - to help individual countries in solving their specific problems and to undertake tasks in the common interest of all its Member States. With this latter aim in mind the Agency has placed a number of research contracts with national research institutes. The purpose and scope of two of them is described below by the scientists responsible for their execution. The Agency has contributed to this work by putting at the institutes' disposal scientists from its own staff apparatus and financial aid.IAEA placed a research contract concerning the effects of small radiation doses on cells, in particular on nervous cells, with the Pharmacological Institute of the University of Vienna. This Institute appeared well suited to deal with the problem owing to the type of its previous research work. The Director, Prof. Franz Bruecke, and his collaborator Dr. Otto Kraupp, have long been interested in the functioning of the nervous system and in the influence of different drugs upon it. It was particularly fortunate that the electrical properties and functions of cells had been measured by a method specially developed at this Institute. From the above mentioned observations one could expect that instantaneous reactions of cells to radiation would also lead to changes of the electrical status. Consequently, this method is now being applied to the research undertaken for IAEA. Different cells of plants and animals, ranging from algae to muscle fibres of mammals, were chosen as objects. So far changes of potentials-had been observed only during irradiation with very high doses. During these investigations another useful test for small radiation doses was developed, namely the measurement of the through-flow of an artificial blood solution through the blood vessels of an intestinal loop. It was observed that a few seconds after irradiation the flow rate diminishes, and returns to its normal level only when irradiation ends

  10. Radiation research contracts: Biological effects of small radiation doses

    Energy Technology Data Exchange (ETDEWEB)

    Hug, O

    1959-01-15

    According to its Statute the IAEA has to fulfil a dual function - to help individual countries in solving their specific problems and to undertake tasks in the common interest of all its Member States. With this latter aim in mind the Agency has placed a number of research contracts with national research institutes. The purpose and scope of two of them is described below by the scientists responsible for their execution. The Agency has contributed to this work by putting at the institutes' disposal scientists from its own staff apparatus and financial aid.IAEA placed a research contract concerning the effects of small radiation doses on cells, in particular on nervous cells, with the Pharmacological Institute of the University of Vienna. This Institute appeared well suited to deal with the problem owing to the type of its previous research work. The Director, Prof. Franz Bruecke, and his collaborator Dr. Otto Kraupp, have long been interested in the functioning of the nervous system and in the influence of different drugs upon it. It was particularly fortunate that the electrical properties and functions of cells had been measured by a method specially developed at this Institute. From the above mentioned observations one could expect that instantaneous reactions of cells to radiation would also lead to changes of the electrical status. Consequently, this method is now being applied to the research undertaken for IAEA. Different cells of plants and animals, ranging from algae to muscle fibres of mammals, were chosen as objects. So far changes of potentials-had been observed only during irradiation with very high doses. During these investigations another useful test for small radiation doses was developed, namely the measurement of the through-flow of an artificial blood solution through the blood vessels of an intestinal loop. It was observed that a few seconds after irradiation the flow rate diminishes, and returns to its normal level only when irradiation ends

  11. Research and development projects in the frame of the technology transfer program of the Kernforschungszentrum Karlsruhe

    International Nuclear Information System (INIS)

    Wuest, J.

    1984-01-01

    Within the framework of the Technology Transfer Programme carried through by kfk for some years now, a specific technology transfer model has been developed for the purpose of efficient utilization of the spin-off. This model showing means and methods of ensuring a continuous, purposeful and controllable organization of the transfer of know-how, is accompanied by experience in the appropriate contractual activities adjusted to the various conditions encountered, as e.g. cooperation and licence agreements, services, consultative agreements, personnel transfer, selling agreements, committed research agreements, and development contracts. Consuming about 2 p.c. of the annual overall expenses of the kfk, the Technology Transfer Programme belongs to the minor projects of the research centre. (DG) [de

  12. On the Techniques and Tools for Privacy-Preserving Smart Contracts

    Directory of Open Access Journals (Sweden)

    Anastasia A. Barinova

    2017-06-01

    Full Text Available Currently, business processes become more and more complicated. Data used in these processes circulates mainly through the digital communications. Due to these conditions some kind of electronic contracts for business deals becomes necessary. Smart contracts should describe a set of conditions, implemented through some events in the real world and digital systems. The most important requirement for this technology is privacy ensuring. In this work we have explored existing projects of privacy-preserving smart contracts, defined comparison criteria, compared projects and made a conclusion about options required for smart contract frameworks.

  13. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  14. Successful contracting of prevention services: fighting malnutrition in Senegal and Madagascar.

    Science.gov (United States)

    Marek, T; Diallo, I; Ndiaye, B; Rakotosalama, J

    1999-12-01

    There are very few documented large-scale successes in nutrition in Africa, and virtually no consideration of contracting for preventive services. This paper describes two successful large-scale community nutrition projects in Africa as examples of what can be done in prevention using the contracting approach in rural as well as urban areas. The two case-studies are the Secaline project in Madagascar, and the Community Nutrition Project in Senegal. The article explains what is meant by 'success' in the context of these two projects, how these results were achieved, and how certain bottlenecks were avoided. Both projects are very similar in the type of service they provide, and in combining private administration with public finance. The article illustrates that contracting out is a feasible option to be seriously considered for organizing certain prevention programmes on a large scale. There are strong indications from these projects of success in terms of reducing malnutrition, replicability and scale, and community involvement. When choosing that option, a government can tap available private local human resources through contracting out, rather than delivering those services by the public sector. However, as was done in both projects studied, consideration needs to be given to using a contract management unit for execution and monitoring, which costs 13-17% of the total project's budget. Rigorous assessments of the cost-effectiveness of contracted services are not available, but improved health outcomes, targeting of the poor, and basic cost data suggest that the programmes may well be relatively cost-effective. Although the contracting approach is not presented as the panacea to solve the malnutrition problem faced by Africa, it can certainly provide an alternative in many countries to increase coverage and quality of services.

  15. 30 CFR 402.10 - Research-project applications.

    Science.gov (United States)

    2010-07-01

    ... project title, project objectives, background information, research tasks, methodology to conduct the... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Research-project applications. 402.10 Section... PROGRAM AND THE WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management...

  16. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  17. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  18. The North Sea contracting industry

    International Nuclear Information System (INIS)

    Wright, P.J.C.

    1996-09-01

    The North Sea Contracting Industry provides in-depth profiles of major contracting organisations including manpower, facilities, expertise, future directions and financial details. It addresses key issues such as: how will the role of operators and contractors change toward 2000 and beyond?; how will the contractor-operator relationship develop?; will the contractors take a more speculative role in projects such as leasing and contract to produce?; does the future belong to broad skilled providers or small specialised niche players, or both?; and how will rapid technological improvements affect the industry? (author)

  19. The relation between project management education and newer streams in project management research

    DEFF Research Database (Denmark)

    Leimbach, Timo; Goodall, Julie Bladt

    2017-01-01

    In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from that of trai......In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from...... that of training technicians, to fostering reflective practitioners that are better equipped to handle the increasing complexity of the profession. This paper is based on a recently commenced re-search project titled "Rethinking Project Management Education – the Role of Universities" that is aimed at analysing...... how the development of PM research is reflected in the education of project managers. On the basis of a short overview of the state of the art of PM education research and practices, the possible challenges for the development of PM education are discussed, and, finding that there is a lack...

  20. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Science.gov (United States)

    2010-01-01

    ... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  1. Coordinated research activities: Annual report and statistics for 2005

    International Nuclear Information System (INIS)

    2006-06-01

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The Agency's Coordinated Research Activities stimulate and coordinate the undertaking of research in selected nuclear fields by scientists in IAEA Member States. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. These Coordinated Research Activities are normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. The Agency may also respond to proposals from institutes for participation in the research activities by awarding individual research contracts not related to a CRP. A small portion of available funds is used to finance individual projects, which deal with topics covered by the Agency's scientific programme. The Agency also supports Doctoral CRPs, which are designed to strengthen promotion of research on nuclear technologies in developing Member States through pair building between agreement holders and contract holders. These CRPs include a PhD training programme at the contract holders' institutions. Three doctoral CRPs currently implemented by the Human Health programme address the management of liver cancer using radionuclide methods, improvement of radiotherapy outcomes in AIDS cancer patients and isotopic and complementary tools for the study of micronutrient status and interactions in developing country populations exposed to multiple nutritional deficiencies. Further information on the Agency's Coordinated Research Activities contained

  2. Coordinated research activities: Annual report and statistics for 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-06-15

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The Agency's Coordinated Research Activities stimulate and coordinate the undertaking of research in selected nuclear fields by scientists in IAEA Member States. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. These Coordinated Research Activities are normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. The Agency may also respond to proposals from institutes for participation in the research activities by awarding individual research contracts not related to a CRP. A small portion of available funds is used to finance individual projects, which deal with topics covered by the Agency's scientific programme. The Agency also supports Doctoral CRPs, which are designed to strengthen promotion of research on nuclear technologies in developing Member States through pair building between agreement holders and contract holders. These CRPs include a PhD training programme at the contract holders' institutions. Three doctoral CRPs currently implemented by the Human Health programme address the management of liver cancer using radionuclide methods, improvement of radiotherapy outcomes in AIDS cancer patients and isotopic and complementary tools for the study of micronutrient status and interactions in developing country populations exposed to multiple nutritional deficiencies. Further information on the Agency's Coordinated Research Activities contained

  3. Advanced energy projects FY 1992 research summaries

    International Nuclear Information System (INIS)

    1992-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are beyond the scope of ongoing applied research or technology development programs. The Division provides a mechanism for converting basic research findings to applications that eventually could impact the Nation's energy economy. Technical topics include physical, chemical, materials, engineering, and biotechnologies. Projects can involve interdisciplinary approaches to solve energy-related problems. Projects are supported for a finite period of time, which is typically three years. Annual funding levels for projects are usually about $300,000 but can vary from approximately $50,000 to $500,000. It is expected that, following AEP support, each concept will be sufficiently developed and promising to attract further funding from other sources in order to realize its full potential. There were 39 research projects in the Division of Advanced Energy Projects during Fiscal Year 1992 (October 1, 1991 -- September 30, 1992). The abstracts of those projects are provided to introduce the overall program in Advanced Energy Projects. Further information on a specific project may be obtained by contacting the principal investigator, who is listed below the project title. Projects completed during FY 1992 are indicated

  4. Toxicology research projects directory, 1978. Monthly repts

    International Nuclear Information System (INIS)

    1978-01-01

    The Toxicology Research Projects Directory is a monthly publication of ongoing research projects in toxicology and related fields selected from the files of the Smithsonian Science Information Exchange (SSIE). Each issue lists toxicology-related research projects reported to SSIE during the one-month period preceding that issue. Each of the summaries is categorized by scientific discipline and assigned a unique identification number for cross-referencing from the Directory Indexes--Subject, Investigator, Performing Organization, Supporting Agency, and Master Grant Number. The thirteenth issue consists of Cumulative Indexes for the entire volume with referencing to projects in all of the previous twelve issues. The emphasis of the Directory is on the manifestations of the exposure of man and animals to toxic substances. Projects are classified by toxic agents, research orientation, and areas of environmental concern

  5. Removal of radon by aeration testing of various aeration techniques for small water works. For European Commission under Contract No FI4PCT960054 TENAWA project

    CERN Document Server

    Salonen, L; Mehtonen, J; Mjoenes, L; Raff, O; Turunen, H

    2002-01-01

    Capability of various aeration techniques to remove radon from water in small waterworks was studied as a part of project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water), which was carried out during 1997-1999 on a cost-shared basis (contract No. F14PCT960054) with The European Commission (CEC) under the supervision of the Directorate-General XII Radiation Protection Research Unit. In TENAWA project both laboratory and field experiments were performed in order to find reliable methods and equipment for removing natural radionuclides from ground water originating either from private wells or small waterworks. Because such techniques are more often needed in private households than at waterworks, the main emphasis of the research was aimed to solve the water treatment problems related to the private water supplies, especially bedrock wells. Radon was the most important radionuclide to be removed from water at waterworks whereas the removal of other radionuclides ( sup 2 sup 3 sup 4...

  6. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  7. Anatomy of a cogeneration deal : natural gas contracts and regulatory issues

    International Nuclear Information System (INIS)

    Brett, J.T.

    1999-01-01

    The special features of gas contracts for cogeneration projects were discussed. It was recommended that a gas power purchase contract should be entered early in a project development cycle to justify requests for new pipeline facilities. Issues regarding buyer's commitments, market prices, and volumes were also discussed. In the event of failure to deliver, the contract should include provisions which would make it possible to source gas elsewhere, terminate the contract or seek damages. This paper also discussed various pricing provisions in a gas commodity contract, security of supplies, gas transportation arrangements, regulatory considerations, outstanding issues, and IMO (independent market operator) requirements

  8. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects: effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  9. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects:effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  10. Internationalization Measures in Large Scale Research Projects

    Science.gov (United States)

    Soeding, Emanuel; Smith, Nancy

    2017-04-01

    Internationalization measures in Large Scale Research Projects Large scale research projects (LSRP) often serve as flagships used by universities or research institutions to demonstrate their performance and capability to stakeholders and other interested parties. As the global competition among universities for the recruitment of the brightest brains has increased, effective internationalization measures have become hot topics for universities and LSRP alike. Nevertheless, most projects and universities are challenged with little experience on how to conduct these measures and make internationalization an cost efficient and useful activity. Furthermore, those undertakings permanently have to be justified with the Project PIs as important, valuable tools to improve the capacity of the project and the research location. There are a variety of measures, suited to support universities in international recruitment. These include e.g. institutional partnerships, research marketing, a welcome culture, support for science mobility and an effective alumni strategy. These activities, although often conducted by different university entities, are interlocked and can be very powerful measures if interfaced in an effective way. On this poster we display a number of internationalization measures for various target groups, identify interfaces between project management, university administration, researchers and international partners to work together, exchange information and improve processes in order to be able to recruit, support and keep the brightest heads to your project.

  11. Advanced energy projects FY 1997 research summaries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The mission of the Advanced Energy Projects (AEP) program is to explore the scientific feasibility of novel energy-related concepts that are high risk, in terms of scientific feasibility, yet have a realistic potential for a high technological payoff. The concepts supported by the AEP are typically at an early stage of scientific development. They often arise from advances in basic research and are premature for consideration by applied research or technology development programs. Some are based on discoveries of new scientific phenomena or involve exploratory ideas that span multiple scientific and technical disciplines which do not fit into an existing DOE program area. In all cases, the objective is to support evaluation of the scientific or technical feasibility of the novel concepts involved. Following AEP support, it is expected that each concept will be sufficiently developed to attract further funding from other sources to realize its full potential. Projects that involve evolutionary research or technology development and demonstration are not supported by AEP. Furthermore, research projects more appropriate for another existing DOE research program are not encouraged. There were 65 projects in the AEP research portfolio during Fiscal Year 1997. Eigheen projects were initiated during that fiscal year. This document consists of short summaries of projects active in FY 1997. Further information of a specific project may be obtained by contacting the principal investigator.

  12. Analysis of FP aerosol behavior in piping in WIND project. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Hidaka, Akihide; Maruyama, Yu; Shibazaki, Hiroaki; Maeda, Akio; Harada, Yuhei [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Nagashima, Toshio; Yoshino, Takehito; Sugimoto, Jun

    1998-07-01

    In the analyses of aerosol behavior test in piping in WIND (Wide Range Piping Integrity Demonstration) project at Japan Atomic Energy Research Institute (JAERI), ART code developed by JAERI and VICTORIA code developed by Sandia National Laboratories are used to perform WIND test analysis and to validate the models in the both codes. It is noted that VICTORIA code is supposed to be used as reference code of ART at JAERI. As a part of these activities, WIND Aerosol Deposition tests (WAD4 and 5) and FP aerosol behaviors in safety relief valve (SRV) line during BWR high pressure sequence which will be performed in future WIND experiment were analyzed with ART and VICTORIA codes. The present analyses showed that the portion and mass with relatively large amount of cesium iodide (CsI) deposition observed in WAD4 and 5 tests were reasonably reproduced by ART and VICTORIA codes. A difference was found in condensation and revaporization behaviors of gaseous CsI between the two codes. VICTORIA overestimated the condensed mass of CsI vapor while ART reproduced better the experimental data than the VICTORIA calculation. Further investigation is needed for this issue. Although the deposition mass at the pipe connection part in WAD4 and 5 experiments was not measured, the mass at that portion will be measured from next experiment because relatively large amount of CsI could be deposited there and the measurement is considered to be useful for code verification. The predicted principal aerosol deposition mechanism in SRV line is turbulence. Temperature of SRV line could increase by about 300 K by decay heat from deposited FPs. However, the SRV line made of carbon steel would not be failed because the predicted temperature is still far lower than the melting temperature of carbon steel. (author)

  13. Wartime Construction Project Outcomes as a Function of Contract Type

    Science.gov (United States)

    2016-07-01

    contract types has been well established. The theory of contractual incentives promulgated by Sherer (1964) established expected contractor...behaviors using a max- imization problem. The theory focuses on expected contractor behaviors in incentive contracts (cf. Federal Acquisition Regulation...Scherer, F. M. (1964). The theory of contractual incentives for cost reduction. Quarterly Journal of Economics, 78, 257–280. Tawazuh Commercial and

  14. 'Ethiopia-Netherlands AIDS research project'

    NARCIS (Netherlands)

    Sanders, E. J.; Rinke de Wit, T. F.; Fontanet, A. L.; Goudsmit, J.; Miedema, F.; Coutinho, R. A.

    2001-01-01

    The 'Ethiopia-Netherlands AIDS Research Project' (ENARP), started in 1994, is a long-term collaboration between AIDS researchers in Amsterdam and the Ethiopian Health and Nutrition Research Institute in Addis Ababa. The ENARP's primary objectives include conducting studies on HIV and AIDS in

  15. Research activities in radiation protection. Programme report 1997. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Goedde, R.; Thieme, M.

    1998-03-01

    On behalf of the Federal Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection (BfS) is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Departmental Research Programme of the year 1997. (orig.) [de

  16. Research activities in radiation protection. Programme report 1996. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Thieme, M.; Goedde, R.

    1997-02-01

    On behalf of the Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Department Research Programme of the year 1996. (orig.) [de

  17. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  18. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  19. Utility Energy Services Contracts Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-08-01

    This document describes best practices in the use of Utility Energy Services Contracts. The recommendations were generated by a group of innovative energy managers in many successful projects. The topics include project financing, competition between utility franchises, and water conservation.

  20. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  1. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  2. Systems Engineering-Based Tool for Identifying Critical Research Systems

    Science.gov (United States)

    Abbott, Rodman P.; Stracener, Jerrell

    2016-01-01

    This study investigates the relationship between the designated research project system independent variables of Labor, Travel, Equipment, and Contract total annual costs and the dependent variables of both the associated matching research project total annual academic publication output and thesis/dissertation number output. The Mahalanobis…

  3. 48 CFR 1552.237-70 - Contract publication review procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review... journal article to the Project Officer, and one copy to the Contracting Officer. (d) If the Government has... AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  4. Integrated Project Delivery (IPD Research Trends.

    Directory of Open Access Journals (Sweden)

    Kahvandi, Z.

    2017-07-01

    Full Text Available Integrated Project Delivery (IPD is introduced as a vibrant approach to enhance project implementation, having particular position in recent studies among construction researchers. This study analyzes the research trends on the field of IPD to provide an appropriate vision for future researchers in this specialized field. While so far no comprehensive research has been done in this field, this study provides a comprehensive review of existing studies through in-depth literature review method. This research evaluates studies conducted in the field of IPD, which is a basis for future researchers to improve conditions of IPD implementation in different countries. For that this study Using library studies, the trend of researches conducted on various concepts and domains during various years, has been investigated. Future studies can simply use the outputs of this research to shape their research flow on establishing continuing progress of IPD. The data obtained from descriptive analyses are illustrated quantitatively, followed by comprehensive analyses and discussion of the results. Moreover, this study concluded that during recent years, the trend of studies conducted about IPD has increased, particularly articles examined challenges. In the next step, more studies have been performed in the field of construction. Those articles are preferred that have evaluated principles, challenges, and solutions for resolving barriers. Proper IPD implementation facilitates enhanced share of information and early identification of stakeholders through a proper timing as vital keys to realize objectives of the construction projects, reduce risks, and increase the chance of project success.

  5. FY 2000 report on the results of the project for the promotion of industrial technology development for the global environment. Project on the investigational research of high technology; 2000 nendo NEDO seika hokokusho. Chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo - Sentan gijutsu chosa kenkyu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    High-tech study was conducted for fields of CO2 fixation/effective utilization, technical development of low environmental load substances and technical development of environmentally friendly type production process, and the FY 2000 results were summarized. Out of the proposals for research projects collected in FY 1999, 25 projects that were recognized to be excellent were consigned to contract research. Research Institute of Innovative Technology for the Earth also selected 4 projects for research. Through research activities, 179 projects were made public, and 2 patents were applied for. The number of research themes was 29 including the following themes: development of food resource resistant to the future global environment, study on new circulation type polymer chemical recycling by bio-process, development of dioxin decomposition technology using artificial enzyme and absorption resin, design of rare metal free cathode substance for large lithium ion secondary battery, and reforming of carbon circulation system in the Australian desert by natural humus supply. (NEDO)

  6. Advanced energy projects FY 1994 research summaries

    International Nuclear Information System (INIS)

    1994-09-01

    The Division of Advanced Energy Projects (AEP) provides support to explore the feasibility of novel, energy-related concepts that evolve from advances in basic research. These concepts are typically at an early stage of scientific definition and, therefore, are premature for consideration by applied research or technology development programs. The AEP also supports high-risk, exploratory concepts that do not readily fit into a program area but could have several applications that may span scientific disciplines or technical areas. Projects supported by the Division arise from unsolicited ideas and concepts submitted by researchers. The portfolio of projects is dynamic and reflects the broad role of the Department in supporting research and development for improving the Nation's energy outlook. FY 1994 projects include the following topical areas: novel materials for energy technology; renewable and biodegradable materials; exploring uses of new scientific discoveries; alternate pathways to energy efficiency; alternative energy sources; and innovative approaches to waste treatment and reduction. Summaries are given for 66 projects

  7. LEGAL PRINCIPLES IN FUNCTION AND PERFORMANCE OF BOT CONTRACT

    Directory of Open Access Journals (Sweden)

    Reifon Cristabella Eventia

    2017-09-01

    Full Text Available Build, Operate and Transfer (BOT represents a long term partnership of the government and private sector. In BOT project, either the government or a private sector identifies a need for a development project. The philosophy in BOT contract begins from the increasing infrastructural needs in all areas and with a limited budget, government are required to commit the duties and functions state governance so that the concept of BOT give a solution through a partnership with the private sector. The government then gives a concession to the private sector to build the project and operate it for a fixed period years, after the period ended, the building shall be transferred to the government. Through BOT, the country is able to gain asset without government spending while maintaining a measure of regulatory control over the project. BOT permits the government to use private sector fund to finance public infrastructure development. The main issues elaborated in this article are the legal principle in the formation of BOT contract and the legal principle in the performance of BOT contract. There are two results; firstly, in the formation of a BOT contract, the principles of partnership and the principle of transparency should be emphasized. Secondly, in performance of the BOT contract, the principle of risk management and the principle of proportionality should be clearly stated in the rules and legal norms.

  8. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  9. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  10. Diversity in research projects - A key to success?

    Science.gov (United States)

    Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle

    2017-04-01

    According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.

  11. Power Generation and Transportation Systems Research Department: 1992 annual status report (Gas Research Institute)

    International Nuclear Information System (INIS)

    Benedict, A.

    1992-09-01

    Activities of Gas Research Institute's Power Generation and Transportation Systems subprogram for the period between October 1, 1991 and September 30, 1992 are summarized. The particular project areas covered in the report are Cogeneration and Power Systems, Engine Technology and Component Development, Natural Gas Vehicles Research, and Electric Power Generation. For each project area a separate chapter is provided. Each chapter includes a rationale for funding the research effort, the goals and objectives to be achieved, a general statement on research accomplishments, and the strategy employed in the project area. Each chapter also contains a series of summary reports on the status of each contract

  12. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  13. 48 CFR 16.103 - Negotiating contract type.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  14. Group contractions in quantum field theory

    International Nuclear Information System (INIS)

    Concini, C. De; Vitiello, G.

    1979-01-01

    General theorems are given for SU(n) and SO(n). A projective geometry argument is also presented with disclosure of the occurrence a group contraction mechanism as a geometric consequence of spontaneous breakdown of symmetry. It is also shown that a contraction of the conformal group gives account of the number of degrees of freedom of an n-pseudoparticle system in an Euclidean SU(2) gauge invariant Yang-Mills theory, in agreement with the result obtained by algebraic geometry methods. Low-energy theorems and ordered states symmetry patterns are observable manifestations of group contractions. These results seem to support the conjecture that the transition from quantum to classical physics involves a group contraction mechanism. (author)

  15. Complete Instruction and Project Book for Contracting. A Library Cooperation Tool.

    Science.gov (United States)

    Radcliffe, Walter H.; Kemper, Robert E.

    An important tool for establishing efficient total library service is contracting, which allows a unit of government or a library to obtain the use of the resources of another library according to its specific needs. A contract can cover services to be purchased, financial arrangements, administrative responsibilities, legal considerations, and…

  16. What do medical students understand by research and research skills? Identifying research opportunities within undergraduate projects.

    Science.gov (United States)

    Murdoch-Eaton, Deborah; Drewery, Sarah; Elton, Sarah; Emmerson, Catherine; Marshall, Michelle; Smith, John A; Stark, Patsy; Whittle, Sue

    2010-01-01

    Undergraduate research exposure leads to increased recruitment into academic medicine, enhanced employability and improved postgraduate research productivity. Uptake of undergraduate research opportunities is reported to be disappointing, and little is known about how students perceive research. To investigate opportunities for undergraduate participation in research, recognition of such opportunities, and associated skills development. A mixed method approach, incorporating student focus and study groups, and documentary analysis at five UK medical schools. Undergraduates recognised the benefits of acquiring research skills, but identified practical difficulties and disadvantages of participating. Analysis of 905 projects in four main research skill areas - (1) research methods; (2) information gathering; (3) critical analysis and review; (4) data processing - indicated 52% of projects provided opportunities for students to develop one or more skills, only 13% offered development in all areas. In 17%, project descriptions provided insufficient information to determine opportunities. Supplied with information from a representative sample of projects (n = 80), there was little consensus in identifying skills among students or between students and researchers. Consensus improved dramatically following guidance on how to identify skills. Undergraduates recognise the benefits of research experience but need a realistic understanding of the research process. Opportunities for research skill development may not be obvious. Undergraduates require training to recognise the skills required for research and enhanced transparency in potential project outcomes.

  17. The 2006 activities and the workshop of the human resources development project in FNCA (Contract research)

    International Nuclear Information System (INIS)

    2007-09-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asia countries. In the Project there are two kinds of activity; In-workshop activity and Outside-workshop activity. The FNCA 2006 Workshop on HRD Project was held on July 31 - August 4, 2006, in Shenzhen, China. The Workshop was sponsored by the China Atomic Energy Authority (CAEA) and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The China Atomic Energy Authority (CAEA) and the Japan Atomic Energy Agency (JAEA) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The activities of HRD Project was presented in the Eighth Coordinators Meeting of FNCA held on February 7th - 9th, 2007, in Tokyo, Japan. This report consists of presentation papers and materials at the FNCA 2006 Workshop, a review document of HRD Project for the Coordinators Meeting of FNCA as Outside-Workshop Activity. (author)

  18. The 2005 activities and the workshop of the human resources development project in FNCA (Contract research)

    International Nuclear Information System (INIS)

    2006-10-01

    In 1999, the Project for Human Resources Development (HRD Project) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project there are two kinds of activity; In-workshop activity and Outside-of-workshop activity. The FNCA 2005 Workshop on HRD Project was held on September 13-16, 2005, in Dalat, Viet Nam. The Workshop was sponsored by the Ministry of Science and Technology (MOST) of Viet Nam and the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan. The Vietnam Atomic Energy Commission (VAEC) and the Japan Atomic Energy Agency (JAEA) acted as the hosts. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The activities of HRD Project was presented in the Seventh Coordinators Meeting of FNCA was held on March 30 - April 1, 2006, in Tokyo, Japan. This report consists of presentation papers and materials at the FNCA 2005 Workshop, a review document of HRD Project for the Coordinators Meeting of FNCA as Outside-Workshop Activity. (author)

  19. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  20. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  1. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Helmut Heiss

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts.Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  2. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Mandeep Lakhan

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts. Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  3. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  4. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  5. 24 CFR 983.207 - Condition of contract units.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.207... in accordance with the HQS. The PHA may not make any HAP payment to the owner for a contract unit.... Such remedies include termination of housing assistance payments, abatement or reduction of housing...

  6. Linguistic analysis of project ownership for undergraduate research experiences.

    Science.gov (United States)

    Hanauer, D I; Frederick, J; Fotinakes, B; Strobel, S A

    2012-01-01

    We used computational linguistic and content analyses to explore the concept of project ownership for undergraduate research. We used linguistic analysis of student interview data to develop a quantitative methodology for assessing project ownership and applied this method to measure degrees of project ownership expressed by students in relation to different types of educational research experiences. The results of the study suggest that the design of a research experience significantly influences the degree of project ownership expressed by students when they describe those experiences. The analysis identified both positive and negative aspects of project ownership and provided a working definition for how a student experiences his or her research opportunity. These elements suggest several features that could be incorporated into an undergraduate research experience to foster a student's sense of project ownership.

  7. NGA-West2 Research Project

    Science.gov (United States)

    Bozorgnia, Yousef; Abrahamson, Norman A.; Al Atik, Linda; Ancheta, Timothy D.; Atkinson, Gail M.; Baker, Jack W.; Baltay, Annemarie S.; Boore, David M.; Campbell, Kenneth W.; Chiou, Brian S.J.; Darragh, Robert B.; Day, Steve; Donahue, Jennifer; Graves, Robert W.; Gregor, Nick; Hanks, Thomas C.; Idriss, I. M.; Kamai, Ronnie; Kishida, Tadahiro; Kottke, Albert; Mahin, Stephen A.; Rezaeian, Sanaz; Rowshandel, Badie; Seyhan, Emel; Shahi, Shrey; Shantz, Tom; Silva, Walter; Spudich, Paul A.; Stewart, Jonathan P.; Watson-Lamprey, Jennie; Wooddell, Kathryn; Youngs, Robert

    2014-01-01

    The NGA-West2 project is a large multidisciplinary, multi-year research program on the Next Generation Attenuation (NGA) models for shallow crustal earthquakes in active tectonic regions. The research project has been coordinated by the Pacific Earthquake Engineering Research Center (PEER), with extensive technical interactions among many individuals and organizations. NGA-West2 addresses several key issues in ground-motion seismic hazard, including updating the NGA database for a magnitude range of 3.0–7.9; updating NGA ground-motion prediction equations (GMPEs) for the “average” horizontal component; scaling response spectra for damping values other than 5%; quantifying the effects of directivity and directionality for horizontal ground motion; resolving discrepancies between the NGA and the National Earthquake Hazards Reduction Program (NEHRP) site amplification factors; analysis of epistemic uncertainty for NGA GMPEs; and developing GMPEs for vertical ground motion. This paper presents an overview of the NGA-West2 research program and its subprojects.

  8. Fiscal 1998 research cooperation project on development of the easy-to-operate electronic design/production support system; 1998 nendo kan'i sosagata denshi sekkei seisan shien system no kaihatsu ni kansuru kenkyu kyoryoku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This report summarizes 'Research cooperation on the easy-to- operate electronic design/production support system' which was promoted together with Asian countries as a part of the international research projects. This project is promoted by joint research with research organizations in China, Indonesia, Malaysia, Singapore and Thailand. The project promotes the interexchange and cooperation of researchers along the memoranda on MATIC (Manufacturing Technology International Cooperation) concluded between NEDO and research organizations every country. The project is implemented by CICC (Center of the International Cooperation for Computerization) through the contract with NEDO. CICC is promoting this project with the production system future integrated information system committee, MATIC committee, and automobile, home appliance, fiber and apparel working groups. The project has been promoted by the survey in fiscal 1994, the basic planning in fiscal 1995-1996, and development of the prototype information system in fiscal 1996-1998. The final demonstration test is scheduled in fiscal 1998. (NEDO)

  9. 33 CFR 211.109 - Contract of sale.

    Science.gov (United States)

    2010-07-01

    ... Navigation Project in Oklahoma, to Former Owners § 211.109 Contract of sale. Upon determination of the price... and deliver it to the applicant for acceptance. The contract of sale shall provide for the deposit of earnest money equal to twenty (20) percent of the price at which the land will be sold or the estimated...

  10. Studies on engineering technologies in the Mizunami Underground Research Laboratory. FY 2007 (Contract research)

    International Nuclear Information System (INIS)

    Noda, Masaru; Suyama, Yasuhiro; Nobuto, Jun; Ijiri, Yuji; Mikake, Shinichiro; Matsui, Hiroya

    2009-07-01

    The Mizunami Underground Research Laboratory (MIU) of the Japan Atomic Energy Agency is a major site for geoscientific research to advance the scientific and technological basis for geological disposal of high-level radioactive waste in crystalline rock. Studies on relevant engineering technologies in the MIU consist of a) research on design and construction technology for very deep underground applications, and b) research on engineering technology as a basis of geological disposal. In the Second Phase of the MIU project (the construction phase), engineering studies have focused on research into design and construction technologies for deep underground. The main subjects in the study of very deep underground structures consist of the following: 'Demonstration of the design methodology', 'Demonstration of existing and supplementary excavation methods', 'Demonstration of countermeasures during excavation' and 'Demonstration of safe construction'. In the FY 2007 studies, identification and evaluation of the subjects for study of engineering technologies in the construction phase were carried out to optimize future research work. Specific studies included: validation of the existing design methodology based on data obtained during construction; validation of existing and supplementary rock excavation methods for very deep shafts; estimation of rock stability under high differential water pressures, methodology on long-term maintenance of underground excavations and risk management systems for construction of underground structures have been performed. Based on these studies, future research focused on the four subject areas, which are 'Demonstration of the design methodology', 'Demonstration of existing and supplementary excavation methods', 'Demonstration of countermeasures during excavation' and 'Demonstration of safe construction', has been identified. The design methodology in the first phase of the MIU Project (surface-based investigation phase) was verified to

  11. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  12. Jmol-Enhanced Biochemistry Research Projects

    Science.gov (United States)

    Saderholm, Matthew; Reynolds, Anthony

    2011-01-01

    We developed a protein research project for a one-semester biochemistry lecture class to enhance learning and more effectively train students to understand protein structure and function. During this semester-long process, students select a protein with known structure and then research its structure, sequence, and function. This project…

  13. Teaching/Research Project "Wheelmap"

    Science.gov (United States)

    Gollenstede, Andreas

    2018-05-01

    In recent years new didactic concepts and approaches have been developed and evaluated at the universities. The concept for cartography lectures presented in this article is based on the close link of research and teaching/learning. The students are involved in all essential steps of a scientific project taking place during a series of lectures - beginning with the development of the scientific issues, followed by the choice and execution of the research methods and finally the presentation of the achieved outcomes. The specific project introduced here is based on self-experiments in which students took the perspective of wheelchair users entrusted with the task to map places, which are accessible for people with impairments. Among others, the goal set for the students was to develop an appropriate concept for the mobile acquisition of data and to visualise the final results by different methods of cartography.

  14. Bio Diesel Cellulosic Ethanol Research Project

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, Edward A. [County of Hendry, FL (United States); Capece, John C. [County of Hendry, FL (United States); McAvoy, Eugene [County of Hendry, FL (United States); Hodges, Alan Wayne [County of Hendry, FL (United States); Shukla, Sanjay [County of Hendry, FL (United States); Ozores-Hamilton, Monica [County of Hendry, FL (United States); Gilbert, Rob [County of Hendry, FL (United States); Wright, Alan [County of Hendry, FL (United States); Baucum, L. [County of Hendry, FL (United States)

    2017-02-07

    The objective of the project is to create the Hendry County Sustainable Biofuels Center and initiate its research, development, and education programs. The mission is to develop engineering and economic assessment methods to evaluate the natural resources impacts of biomass farming and fuel conversion systems; provide sustainability assessments of specific biofuels productions proposals; develop biomass farming and fuel conversion systems that are compatible with south Florida ecosystem restoration priorities; create ecosystem services opportunities and structures to diversify farm income; monitor the range of research and development activities necessary to the creation of sutstainable biofuels production systems in south Florida, identify gaps in the regional research, and assist in the development and coordination of additional projects to fill out the required knowledge base; prepare the workforce of southwest Florida for employment in biofuels related professions; and assist businesses & governmental design and realize sustainable biofuels projects.

  15. Iterative Contracts as Proactive Law Instruments

    DEFF Research Database (Denmark)

    Henschel, René Franz

    2012-01-01

    The purpose of this article is to analyse the use of proactive law in contracts illustrated by the use of a particular type of contract within the IT industry, the so-called iterative contract. This type of contract has its root in a special software development process called iterative and incre...... the potential to create more business success. However, empirical research still needs to be done in order to confirm that these types of contracts are better at securing business success than traditional contract forms....

  16. Coordinated research activities: Annual report and statistics for 2004

    International Nuclear Information System (INIS)

    2005-05-01

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The Agency's Coordinated Research Activities stimulate and coordinate the undertaking of research in selected nuclear fields by scientists in IAEA Member States. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. These Coordinated Research Activities are normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. The Agency may also respond to proposals from institutes for participation in the research activities by awarding individual research contracts not related to a CRP. A small portion of available funds is used to finance individual projects, which deal with topics covered by the Agency's scientific programme. The Agency also supports Doctoral CRPs, which are designed to strengthen promotion of research on nuclear technologies in developing Member States through pair building between agreement holders and contract holders. These CRPs include a PhD training programme at the contract holders' institutions. Three doctoral CRPs currently implemented by the Human Health programme address the management of liver cancer using radionuclide methods, improvement of radiotherapy outcomes in AIDS cancer patients and isotopic and complementary tools for the study of micronutrient status and interactions in developing country populations exposed to multiple nutritional deficiencies. Further information on the Agency's coordinated research activities

  17. Coordinated research activities: Annual report and statistics for 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-15

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The Agency's Coordinated Research Activities stimulate and coordinate the undertaking of research in selected nuclear fields by scientists in IAEA Member States. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. These Coordinated Research Activities are normally implemented through Coordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. The Agency may also respond to proposals from institutes for participation in the research activities by awarding individual research contracts not related to a CRP. A small portion of available funds is used to finance individual projects, which deal with topics covered by the Agency's scientific programme. The Agency also supports Doctoral CRPs, which are designed to strengthen promotion of research on nuclear technologies in developing Member States through pair building between agreement holders and contract holders. These CRPs include a PhD training programme at the contract holders' institutions. Three doctoral CRPs currently implemented by the Human Health programme address the management of liver cancer using radionuclide methods, improvement of radiotherapy outcomes in AIDS cancer patients and isotopic and complementary tools for the study of micronutrient status and interactions in developing country populations exposed to multiple nutritional deficiencies. Further information on the Agency's coordinated research activities

  18. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  19. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  20. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  1. Needs assessment in health research projects: a new approach to project management in iran.

    Science.gov (United States)

    Peykari, Niloofar; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Djalalinia, Shirin

    2013-01-01

    The science and technology health plan has defined the outline of health research to the national vision of Iran by 2025. The aim of this study was to focus on the process of needs assessment of health research projects also health research priority setting in Iran. THE PROJECT MANAGEMENT LIFE CYCLE HAS FOUR PHASES: Initiation, Planning, Execution and Closure. Based on abovementioned points we conducted the study. Focusing on the needs assessment led to systematic implementation of needs assessment of health project in all of the medical sciences universities. Parallel with this achieved strategies health research priority setting was followed through specific process from empowerment to implementation. We should adopt with more systematic progressive methods of health project managements for both our national convenience as well as our international health research programs.

  2. The lifecycle approach as a driver for innovative power contracting; Der Lifecycle-Ansatz als Treiber fuer innovatives Energie-Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Gayer, Alfred [RWE Energiedienstleistungen GmbH (Germany)

    2011-07-01

    The sensible and efficient use of energy raises more and more the general awareness. The efficiency of projects will be influenced not only by the replacement of existing technology, but also mainly by the general conception of the design of decentralized energy supplies. The integration of waste heat from production-related processes as well as the use of all forms of energy such as electricity, heat, refrigeration and compressed air to meet the customer needs in a comprehensive energy plan increase the complexity and significantly the efficiencies. In the implementation of such projects the contracting is becoming increasingly important because the future gains in efficiency are taken into account directly. Contracting projects include the traditional total-cost-of-ownership approach (lifecycle approach). This approach considers the investment costs as well as the consequential costs of a project and shows how to optimize the total cost.

  3. Fiscal 1998 research cooperation project on development of the easy-to-operate electronic design/production support system; 1998 nendo kan'i sosagata denshi sekkei seisan shien system no kaihatsu ni kansuru kenkyu kyoryoku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This report summarizes 'Research cooperation on the easy-to- operate electronic design/production support system' which was promoted together with Asian countries as a part of the international research projects. This project is promoted by joint research with research organizations in China, Indonesia, Malaysia, Singapore and Thailand. The project promotes the interexchange and cooperation of researchers along the memoranda on MATIC (Manufacturing Technology International Cooperation) concluded between NEDO and research organizations every country. The project is implemented by CICC (Center of the International Cooperation for Computerization) through the contract with NEDO. CICC is promoting this project with the production system future integrated information system committee, MATIC committee, and automobile, home appliance, fiber and apparel working groups. The project has been promoted by the survey in fiscal 1994, the basic planning in fiscal 1995-1996, and development of the prototype information system in fiscal 1996-1998. The final demonstration test is scheduled in fiscal 1998. (NEDO)

  4. Methodology of impact assessment of research projects

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2014-01-01

    In the context of the management of research projects development it is necessary to have tools to monitor and evaluate progress and the performance of the projects, as well as their results and the impact on society (international agencies of the United Nations and the States 2002 and 2005 Paris Declaration), with the objective of to ensure their contribution to the social and economic development of countries. Many organizations, agencies and Governments apply different methodologies (IDB, World Bank, UNDP, ECLAC, UNESCO; UNICEF, Canada, Japan, other) for these purposes. In the results-based project management system not only paramount is the process or product itself, but also the result or impact of the project (if the program/project produced the effects desired persons, households and institutions and whether those effects are attributable to the intervention of the program / project). The work shows a methodology that allows for a qualitative and quantitative evaluation of impact of research projects and has been result of experience in project management of international collaboration with the International Agency for Atomic Energy (IAEA) and the Cuban Nuclear programme. (author)

  5. Environment and safety research status report: 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The 1993 status report discusses ongoing and planned research activities in the GRI Environment and Safety Program. The objectives and goals, accomplishments, and strategy along with the basis for each project area are presented for the supply, end use, and gas operations subprograms. Within the context of these subprograms, contract status summaries under their conceptual titles are given for the following project areas: Gas Supply Environmental and Safety Research, Air Quality Research, End Use Equipment Safety Research, Gas Operations Safety Research, Liquefied Natural Gas, Safety Research, and Gas Operations Environmental Research

  6. 48 CFR 46.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... QUALITY ASSURANCE Warranties 46.710 Contract clauses. The clauses and alternates prescribed in this... research and development contract is contemplated and the use of a warranty clause has been approved under... performance specifications or design are of major importance; a fixed-price supply, service, or research and...

  7. Incomplete contracting theory in empirical accounting research

    NARCIS (Netherlands)

    van Lent, L.A.G.M.

    1999-01-01

    In three essays, the implications of the costly contracting approach in accounting are investigated. First, the consequences of changing the set of acceptable accounting techniques in the banking and insurance industry are examined. The regulations imposed by a government agency alter the

  8. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  9. Report on {open_quotes}inspection of human subject research in intelligence and intelligence-related projects{close_quotes}

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-16

    Executive Order 12333, {open_quotes}United States Intelligence Activities,{close_quotes} (1) designates the Department`s intelligence element as a member of the Intelligence Community, and (2) states that no agency within the Intelligence community shall sponsor, contract for or conduct research on human subjects except in accordance with guidelines issued by the Department of Health and Human Services. The Federal policy for the Protection of Human Subjects, which was based on Department of Health and Human Services regulations, was promulgated in Title 10 Code of Federal Regulations Part 745 by the Department of Energy. The purpose of this inspection was to review the internal control procedures used by the Office of Nonproliferation and National Security to manage selected intelligence and intelligence-related projects that involve human subject research.

  10. 28 CFR 512.20 - Publication of results of research project.

    Science.gov (United States)

    2010-07-01

    ... project. 512.20 Section 512.20 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  11. Math Fact Strategies Research Project

    Science.gov (United States)

    Boso, Annie

    2011-01-01

    An action research project was conducted in order to determine effective math fact strategies for first graders. The traditional way of teaching math facts included using timed tests and flashcards, with most students counting on their fingers or a number line. Six new research-based strategies were taught and analyzed to decide which methods…

  12. Federal Research and Development Contract Trends and the Supporting Industrial Base, 2000-2014

    Science.gov (United States)

    2016-04-30

    Homeland Security, and government-wide services contracting trends; sourcing policy and cost estimation methodologies; and recent U.S. Army modernization ...been fears that the sharp downturn in federal contract obligations would disproportionately impact the R&D contracting portfolios within individual...329 - contracting portfolios , and the industrial base that supports those efforts, within each R&D contracting agency. The main finding of this

  13. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  14. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  15. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  16. Overview of research in the ADVANTAGE project

    DEFF Research Database (Denmark)

    Angjelichinoski, Marko; Cosovic, Mirsad; Kalalas, Charalampos

    2016-01-01

    The European Marie Curie Project ADVANTAGE (Advanced Communications and Information processing in smart grid systems) was launched in 2014. It represents a major inter-disciplinary research project into the topic of Smart Grid technology. A key aspect of the project is to bring together and train...

  17. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  18. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  19. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  20. Simple Tools to Facilitate Project Management of a Nursing Research Project.

    Science.gov (United States)

    Aycock, Dawn M; Clark, Patricia C; Thomas-Seaton, LaTeshia; Lee, Shih-Yu; Moloney, Margaret

    2016-07-01

    Highly organized project management facilitates rigorous study implementation. Research involves gathering large amounts of information that can be overwhelming when organizational strategies are not used. We describe a variety of project management and organizational tools used in different studies that may be particularly useful for novice researchers. The studies were a multisite study of caregivers of stroke survivors, an Internet-based diary study of women with migraines, and a pilot study testing a sleep intervention in mothers of low-birth-weight infants. Project management tools were used to facilitate enrollment, data collection, and access to results. The tools included protocol and eligibility checklists, event calendars, screening and enrollment logs, instrument scoring tables, and data summary sheets. These tools created efficiency, promoted a positive image, minimized errors, and provided researchers with a sense of control. For the studies described, there were no protocol violations, there were minimal missing data, and the integrity of data collection was maintained. © The Author(s) 2016.

  1. The participation of IPEN in the IAEA coordinated research projects on accelerators driven systems (ADS)

    Energy Technology Data Exchange (ETDEWEB)

    Maiorino, J.R.; Santos, A.; Carluccio, T.; Rossi, P.C.R.; Antunes, A.; Oliveira, F. de; Lee, S.M. [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)]. E-mail: maiorino@ipen.br

    2007-07-01

    This paper describes the participation of the IPEN in the International Atomic Energy Agency (IAEA) Coordinated Research Projects(CRP) on Analytical and Experimental Benchmark Analysis on ADS and Low Enriched Uranium Fuel Utilization in ADS. The first CRP has as specific objective to improve the present understanding of the coupling of an external neutron source [e.g. a spallation source in the case of the accelerator driven system (ADS)] with a multiplicative sub-critical core, and the second CRP, or collaborative work, the utilization of LEU in existing or planned ADS facilities. IPEN participate in both CRP through a research contract (13388), and although there are several benchmarks defined in both CRP, presently IPEN is participating in the activities related with reactor physics benchmark of the Yalina Booster facility in Belarus, in the analytical and numerical benchmarking of methods and codes for ADS kinetics, and in the ADS target calculations. Besides, since there are plans to introduce a compact neutron generator in a sub critical core of the IPEN-MB-01 facility, a benchmark of a simulation of such project has been proposed in the LEU-ADS CRP. The paper will review the CRPs with details on the activities in which IPEN is participating. (author)

  2. The participation of IPEN in the IAEA coordinated research projects on accelerators driven systems (ADS)

    International Nuclear Information System (INIS)

    Maiorino, J.R.; Santos, A.; Carluccio, T.; Rossi, P.C.R.; Antunes, A.; Oliveira, F. de; Lee, S.M.

    2007-01-01

    This paper describes the participation of the IPEN in the International Atomic Energy Agency (IAEA) Coordinated Research Projects(CRP) on Analytical and Experimental Benchmark Analysis on ADS and Low Enriched Uranium Fuel Utilization in ADS. The first CRP has as specific objective to improve the present understanding of the coupling of an external neutron source [e.g. a spallation source in the case of the accelerator driven system (ADS)] with a multiplicative sub-critical core, and the second CRP, or collaborative work, the utilization of LEU in existing or planned ADS facilities. IPEN participate in both CRP through a research contract (13388), and although there are several benchmarks defined in both CRP, presently IPEN is participating in the activities related with reactor physics benchmark of the Yalina Booster facility in Belarus, in the analytical and numerical benchmarking of methods and codes for ADS kinetics, and in the ADS target calculations. Besides, since there are plans to introduce a compact neutron generator in a sub critical core of the IPEN-MB-01 facility, a benchmark of a simulation of such project has been proposed in the LEU-ADS CRP. The paper will review the CRPs with details on the activities in which IPEN is participating. (author)

  3. Defense Threat Reduction Agency > Contracts > Contract Award Data

    Science.gov (United States)

    Integration Command Senior Enlisted Leader Media News News Archive Strategic Plan Videos Mission Research Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current Justifications & Approvals Careers Who We Are Our Values Strategic Recruiting Programs Professional

  4. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  5. New Perils for the Contract Ethnographer.

    Science.gov (United States)

    Fetterman, David M.

    1981-01-01

    Conditions of contract research may lead some workers to ignore publication rights of colleagues whose reports are of limited circulation. The author presents a case example of how this process occurred with the use of his own work and argues for rigorous ethical standards in the publication of contract research results. (Author/GC)

  6. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  7. Atmospheric Science Program. Summaries of research in FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report provides descriptions for all projects funded by ESD under annual contracts in FY 1994. Each description contains the project`s title; three-year funding history (in thousands of dollars); the contract period over which the funding applies; the name(s) of the principal investigator(s); the institution(s) conducting the projects; and the project`s objectives, products, approach, and results to date (for most projects older than one year). Project descriptions are categorized within the report according to program areas: atmospheric chemistry, atmospheric dynamics, and support operations. Within these categories, the descriptions are ordered alphabetically by principal investigator. Each program area is preceded by a brief text that defines the program area, states it goals and objectives, lists principal research questions, and identifies program managers. Appendixes provide the addresses and telephone numbers of the principal investigators and define the acronyms used.

  8. Informal contracting between and within firms

    Directory of Open Access Journals (Sweden)

    Ricard Gil

    Full Text Available Abstract While informal contracts are widely used in modern economies, limited systematic empirical evidence is available to researchers and policy makers. This paper aims to fill the gap by discussing a selected sample of empirical works through the lens of a theoretical framework that clarifies the role of informal contracts. We also highlight unexplored research opportunities offered by more recent theoretical models that investigate how informal contracts are built over time, how they are subject to path dependency, and how relational rents are created, and are awaiting empirical analysis.

  9. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  10. Small angle neutron scattering. Report of a coordinated research project 2000-2003

    International Nuclear Information System (INIS)

    2006-03-01

    Small angle neutron scattering (SANS) is a powerful technique for studying macro structures like polymers, precipitates in metallurgical specimens, biological molecules, micelles and magnetic systems like ferrofluids. Neutron scattering has an advantage over X ray scattering (XSAXS) due to selective absorption and scattering cross section of neutrons across the periodic table. It is possible to develop and use a SANS instrument even with a medium flux reactor. The present CRP was aimed at the development of components like collimators, monochromators, position sensitive detectors (PSD) etc. for improving the throughput of the instrument and foster the effective utilization of research reactors, as well as to provide a link between developing and developed facilities. The CRP was launched with the first research coordination meeting (RCM) in 2000 to refine the project proposals and define the action plans and partnerships. There were eight research contracts and four research agreements. Good partnerships were established between various participants with collaborations among participants from various countries including those from developing and developed countries. The progress of the individual projects and team work under the CRP was evaluated and discussed during the second RCM and the action plan for the final phase was formulated. The results of the work done under the CRP were then reviewed in the final RCM held in Vienna, December 2003. This publication presents the results of the work carried out by the participants under the CRP at their respective institutions. The information will be useful for the users and operators of research reactors in developing an instrument and building collaborations for capacity building. The development of collimators, detector assemblies, utilization of the SANS for microstructural characterization of advanced materials , development and design of a ultra small angle neutron scattering (USANS) and proposals for a new SANS

  11. Reports on the research projects in the field of reactor safety sponsored by the Federal Ministry of Science and Technology

    International Nuclear Information System (INIS)

    1975-12-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the safety program 'Reactor Safety' are sponsored by the Bundesminister fuer Forschung und Technologie (BMFT - Secretary of State for Research and Technology). Objective of this program is to continue improving the safety of LWR, in order to minimize the risk for the environment. With grant assistance from the Bundesminister des Innern (BMI - Secretary of State for Home Affairs) research contracts in the field of reactor safety are being performed. Results of these projects should contribute to resolve questions arising nuclear licensing procedures. The Forschungsbetreuung (FB - research supervision department) at the Institute for Reactor Safety (IRS), as consultants to BMFT and BMI, provides information about the progress of investigations. Individual reports will be prepared and put into standard forms by the research contractors. Each report gives information on: 1) the work accomplished, 2) the results obtained, 3) the work planned to be continued. Initial reports of research projects describe in addition the purpose of the work. A BMFT-research program on the safety of Fast Breeders (Schneller Brutreaktor - SBR) is presently under discussion. In order to define several problems, investigations included in the present compilation (RS 139, 140, 143, 162) will be previously performed. (orig.) [de

  12. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  13. HOW DESIGN RESEARCHERS CAN LEAD HIGHER EDUCATION TO A GREATER IMPACT ON SOCIETY

    DEFF Research Database (Denmark)

    Howard, Thomas J.; McMahon, C.A.; Giess, M.D.

    2011-01-01

    . However, with the aid of available government funding, researchers could benefit from undertaking such support work to fill gaps between fixed term research contracts; though administering short term irregular contracts proved a major unresolved barrier. It is recommended that engineering design...... researchers work as projects managers to provide technology and knowledge transfer, drawing further expertise from researchers within their universities. A trail case was completed showing identifying three key barriers to future progress....

  14. Short-Term Contract Work in Adult Education (I) and (II).

    Science.gov (United States)

    Hall, Dorothea; McMath, Patricia

    1986-01-01

    This two-part article discusses short-term project contracts for adult education staff. Part one covers implications of this trend for the service and for the staff involved. Part two looks at short-term contracts from the management viewpoint. (CH)

  15. Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract

    NARCIS (Netherlands)

    Favie, R.; Nordennen, van A.; Kleine, A.J.; Maas, G.J.; Ceric, A.; Radujkovic, M.

    2009-01-01

    In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are

  16. Green Performance Contracting Strategy for Highway Construction Projects

    OpenAIRE

    2014-01-01

    With the growing awareness of sustainability and global climate change, state highway agencies are taking essential steps to reduce carbon emissions from highway infrastructure on a life cycle basis. While much is known regarding climate change mitigation and adaption strategies during highway operation, very little is understood about how climate change issues should be integrated into highway planning, delivery, and construction processes. This paper presents the current contracting pra...

  17. Evaluation of the Montana Department of Transportation's research project solicitation, prioritization, and selection process

    Science.gov (United States)

    2008-05-01

    The Montana Department of Transportation (MDT) contracted the Bureau of Business and Economic Research at the University of Montana Missoula to conduct research to determine how other states solicit, prioritize, and select research problem statem...

  18. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  19. Report on the first research co-ordination meeting of the co-ordinated research project: 'The development of strategies for the effective monitoring of veterinary drug residues in livestock and livestock products in developing countries' (D3.20.22)

    International Nuclear Information System (INIS)

    2002-01-01

    The first Research Co-ordination Meeting (RCM) of the Co-ordinated Research Project (CRP) on 'the development of strategies for the effective monitoring of veterinary drug residues in livestock and livestock products in developing countries' was held in the Vienna International Centre from 2 to 6 September 2002. Twelve Research Contracts (RCs) and 3 Research Agreements (RAs) have been awarded under this CRP and all awardees, the Project Officer and a guest speaker from the Austrian Agency for Health and Food Safety (AAHFS) participated in the RCM. The objective of the RCM was to plan the first phase of the CRP, initiation of the development and validation of methods. Specific objectives were to: Agree upon a small number of veterinary drugs upon which to focus the research; Agree upon analytical methodologies to be employed; formulate individual work plans for each research contract holder within the framework of the overall work plan. Each RC holder presented an overview of residues monitoring from the perspective of their respective countries. Emphasis was placed on problems encountered and future requirements. The participants visited the Austrian National Reference Laboratory for veterinary drug residues at Moedling and discussed the activities there with Mr. Kuhn and laboratory staff. An overall framework for phase of the CRP, focusing upon the compounds and analytical techniques of major importance to the majority of participants, was formulated. Each RC holder discussed and revised their individual work plan with the RA holders and the PO. The overall framework was then reviewed and a summary of the individual work plans presented. Conclusions and recommendations were drafted

  20. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  1. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  2. AVST Morphing Project Research Summaries in Fiscal Year 2001

    Science.gov (United States)

    McGowan, Anna-Maria R.

    2002-01-01

    The Morphing project at the National Aeronautics and Space Agency's Langley Research Center is part of the Aerospace Vehicle Systems Program Office that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing project are to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include micro or macro, structural or fluidic approaches. The current document on the Morphing project is a compilation of research summaries and other information on the project from fiscal year 2001. The focus of this document is to provide a brief overview of the project content, technical results and lessons learned from fiscal year 2001.

  3. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  4. Energy performance contracting - energy saving potential of selected energy conservation measures (ECM)

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M. (Dansk Energi Analyse A/S, Frederiksberg (Denmark)); Langkilde, G.; Olesen, Bjarne W. (Technical Univ. of Denmark, ICIEE, Kgs. Lyngby (Denmark)); Moerck, O. (Cenergia Energy Consultants, Herlev (Denmark)); Sundman, O. (DONG Energy, Copenhagen (Denmark)); Engelund Thomsen, K. (Aalborg Univ., SBi, Hoersholm (Denmark))

    2008-09-15

    This report has been developed under the research project 'Etablering af grundlag for energitjenester i Danmark' (project number: ENS-33031-0185) under the Danish research programme - EFP. The objective of this project has been to contribute to the utilisation of the large potential for energy conservations in the building sector within the public, industry and service sectors through the development of a better basis for decision making for both the Energy Service Companies (ESCOes) and the building owners. The EU directive on Energy Service Contracting points at the buildings as the area where the biggest potential market for energy services and energy efficiency improvements are. The EFP-project has two parts: (1) A Danish part and (2) participation in the international cooperation project 'Holistic Assesment Tool-Kit on Energy Efficient Retrofit Measures for Government Buildings (EnERGo)', Annex 46 under the IEA R and D program 'Energy Conservation In Buildings And Community Systems' (ECBCS). This report describes the Danish contributions to the IEA projects subtask B, which has a primary objective to develop a database of energy conservation measures (ECM) with descriptions and performance characteristics of these. (au)

  5. Energy performance contracting - energy saving potential of selected energy conservation measures (ECM)

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, M [Dansk Energi Analyse A/S, Frederiksberg (Denmark); Langkilde, G; Olesen, Bjarne W [Technical Univ. of Denmark, ICIEE, Kgs. Lyngby (Denmark); Moerck, O [Cenergia Energy Consultants, Herlev (Denmark); Sundman, O [DONG Energy, Copenhagen (Denmark); Engelund Thomsen, K [Aalborg Univ., SBi, Hoersholm (Denmark)

    2008-09-15

    This report has been developed under the research project 'Etablering af grundlag for energitjenester i Danmark' (project number: ENS-33031-0185) under the Danish research programme - EFP. The objective of this project has been to contribute to the utilisation of the large potential for energy conservations in the building sector within the public, industry and service sectors through the development of a better basis for decision making for both the Energy Service Companies (ESCOes) and the building owners. The EU directive on Energy Service Contracting points at the buildings as the area where the biggest potential market for energy services and energy efficiency improvements are. The EFP-project has two parts: (1) A Danish part and (2) participation in the international cooperation project 'Holistic Assesment Tool-Kit on Energy Efficient Retrofit Measures for Government Buildings (EnERGo)', Annex 46 under the IEA R and D program 'Energy Conservation In Buildings And Community Systems' (ECBCS). This report describes the Danish contributions to the IEA projects subtask B, which has a primary objective to develop a database of energy conservation measures (ECM) with descriptions and performance characteristics of these. (au)

  6. Artificial Intelligence Project

    Science.gov (United States)

    1990-01-01

    Symposium on Aritificial Intelligence and Software Engineering Working Notes, March 1989. Blumenthal, Brad, "An Architecture for Automating...Artificial Intelligence Project Final Technical Report ARO Contract: DAAG29-84-K-OGO Artificial Intelligence LaboratO"ry The University of Texas at...Austin N>.. ~ ~ JA 1/I 1991 n~~~ Austin, Texas 78712 ________k A,.tificial Intelligence Project i Final Technical Report ARO Contract: DAAG29-84-K-0060

  7. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  8. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  9. Report on the research and development work of 1984 in the project atomic fusion

    International Nuclear Information System (INIS)

    Finken, D.

    1985-02-01

    The work done by the Nuclear Research Centre in Karlsruhe on fusion under magnetic influence is compiled in the project atomic fusion and put in the programme for European Fusion Technology. The work is supported by an association contract between KfK and Euratom via the European Commission. Some of the work exceeds the volume defined in the E.E.C's technology programme. Using these papers, mostly studies, connections are established between the various fields of work and new tasks prepared. This is taking place in the light of the expected extension of the technology programme in the coming year and the plans for NET. The reports compiled here are the 1984 papers from the KfK institute. The appendix contains a compilation of the tasks undertaken by KfK from the EEC's fusion technology programme. (orig./GG) [de

  10. Advanced Energy Projects FY 1990 research summaries

    International Nuclear Information System (INIS)

    1990-09-01

    This report serves as a guide to prepare proposals and provides summaries of the research projects active in FY 1990, sponsored by the Office of Basic Energy Sciences Division of Advanced Energy Projects, Department of Energy. (JF)

  11. 7 CFR 932.45 - Production research and marketing research and development projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Production research and marketing research and....45 Production research and marketing research and development projects. (a) The following activities... Secretary, establish or provide for the establishment of production research, and marketing research and...

  12. STUK research projects 1998-2000; Saeteilyturvakeskuksen tutkimushankkeet 1998-2000

    Energy Technology Data Exchange (ETDEWEB)

    Salomaa, S; Eloranta, E; Heimbuerger, H; Jokela, K; Jaervinen, H

    1998-07-01

    The primary goal of STUK, the Finnish Radiation and Nuclear Safety Authority, is to prevent and limit the harmful effects of radiation. The research conducted by STUK yields new information related to the use, occurrence and effects of radiation and promotes the supervision of nuclear safety. STUK research projects 1998 - 2000 summarizes STUK`s own research projects and commissioned research designed to promote the supervision of nuclear safety. Information on the research projects and related publications is also available on STUK`s WWW pages at www.stuk.fi. The work done on the safe use of nuclear power and nuclear waste management mainly comprises commissioned research projects which derive from the needs of authorities, and are funded and directed by STUK. This research is conducted by organizations outside STUK, but supervised by STUK experts. In some cases, STUK personnel are also involved. The goal of this research work is to produce the information needed for decision-making, to develop supervisory methods and to ensure that recent developments in science and technology are taken into account in action to promote safe use of nuclear power. STUK`s own research focuses on radiation protection and the health effects of radiation. During 1998 - 2000, the main emphasis will be on projects supporting the Finnish national environmental health action plan, the health risks of radiation, emergency preparedness and cooperation with neighbouring CEE areas. EU directives on radiation protection and medical exposure to radiation also influence the course taken by research carried out at STUK. STUK`s research activities are now more international than ever; the institute is involved in more then 20 research projects funded by EU. Apart from the EU and the Nordic countries, STUK`s main partners are to be found in Russia, Estonia and the USA. (orig.)

  13. Research Applications for Teaching (RAFT) Project. Final Report.

    Science.gov (United States)

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  14. Defining and implementing a model for pharmacy resident research projects

    Directory of Open Access Journals (Sweden)

    Dick TB

    2015-09-01

    Full Text Available Objective: To describe a standard approach to provide a support structure for pharmacy resident research that emphasizes self-identification of a residency research project. Methods: A subcommittee of the residency advisory committee was formed at our institution. The committee was initially comprised of 2 clinical pharmacy specialists, 1 drug information pharmacist, and 2 pharmacy administrators. The committee developed research guidelines that are distributed to residents prior to the residency start that detail the research process, important deadlines, and available resources. Instructions for institutional review board (IRB training and deadlines for various assignments and presentations throughout the residency year are clearly defined. Residents conceive their own research project and emphasis is placed on completing assignments early in the residency year. Results: In the 4 years this research process has been in place, 15 of 16 (94% residents successfully identified their own research question. All 15 residents submitted a complete research protocol to the IRB by the August deadline. Four residents have presented the results of their research at multi-disciplinary national professional meetings and 1 has published a manuscript. Feedback from outgoing residents has been positive overall and their perceptions of their research projects and the process are positive. Conclusion: Pharmacy residents selecting their own research projects for their residency year is a feasible alternative to assigning or providing lists of research projects from which to select a project.

  15. Advanced Energy Projects: FY 1993, Research summaries

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included.

  16. Advanced Energy Projects: FY 1993, Research summaries

    International Nuclear Information System (INIS)

    1993-09-01

    AEP has been supporting research on novel materials for energy technology, renewable and biodegradable materials, new uses for scientific discoveries, alternate pathways to energy efficiency, alternative energy sources, innovative approaches to waste treatment and reduction, etc. The summaries are grouped according to projects active in FY 1993, Phase I SBIR projects, and Phase II SBIR projects. Investigator and institutional indexes are included

  17. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  18. Solar buildings program contract summary, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-07

    The mission of the US Department of Energy's Solar Buildings Program is to advance the development and widespread deployment of competitive solar thermal technologies for use in buildings. The long-term goal of the Program is to combine solar energy technologies with energy-efficient construction techniques and create cost-effective buildings that have a zero net need for fossil fuel energy on an annual basis. The Solar Buildings Program conducts research and development on solar technologies that can deliver heat, light, and hot water to residential and commercial buildings. By working closely with manufacturers in both the buildings and solar energy industries and by supporting research at universities and national laboratories, the Solar Buildings Program brings together the diverse players developing reliable and affordable solar technologies for building applications. The National Renewable Energy Laboratory (NREL) in Golden, Colorado, and Sandia National Laboratories (SNL) in Albuquerque, New Mexico, jointly participate in the Solar Buildings Program. These two national laboratories work closely with industry researching new concepts, developing technology improvements, reducing manufacturing costs, monitoring system performance, promoting quality assurance, and identifying potential new markets. In calendar year 1999, the Solar Buildings Program focused primarily on solar hot water system research and development (R and D), US industry manufacturing assistance, and US market assistance. The Program also completed a number of other projects that were begun in earlier years. This Contract Summary describes the Program's contracted activities that were active during 1999.

  19. Research from Afar: Considerations for Conducting an Off-Site Research Project.

    Science.gov (United States)

    Williams, Reg Arthur; Hagerty, Bonnie M.; Hoyle, Kenneth; Yousha, Steven M.; Abdoo, Yvonne; Andersen, Curt; Engler, Dorothy

    1999-01-01

    Critical elements in the success of off-site research projects include the following: negotiation, attention to personnel issues, communication, participation of research subjects, data management, and concern for privacy issues. (SK)

  20. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  1. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  2. Overview of decommissioning research and development activities in the European Community

    International Nuclear Information System (INIS)

    Huber, B.

    1982-01-01

    The European Community's research program on the decommissioning of nuclear power plants is managed by the Commission of the European Communities and carried out by national laboratories and private firms under cost-sharing contracts. Starting in 1980, about fifty research contracts covering a large variety of topics have been let so far. The paper outlines the content, progress and selected results of the seven projects composing the program. These projects concern the following subjects: maintaining disused plants in a safe condition; decontamination for decommissioning purposes; dismantling techniques; treatment of waste materials; large waste containers; estimation of waste arisings; and plant design features facilitating decommissioning. 4 references

  3. Final Report on the Research Project Ringhals Diagnostics and Monitoring. Stage 4

    International Nuclear Information System (INIS)

    Demaziere, C.; Arzhanov, V.; Karlsson, Joakim K.H.; Pazsit, I.

    1999-01-01

    This report gives an account of the work performed by the Department of Reactor Physics in the frame of a research contract with Ringhals, Vattenfall AB. The contract constitutes Stage 4 of a long-term co-operative research work concerning diagnostics and monitoring of the BWR and PWR units. The work in Stage 4 has been performed between 1 October 1998 and 1 September 1999. In Stage 4 we have worked with four items as follows: 1. Regional modes in R1 stability measurements; 2. Analysis of data from the measurement 980604; 3. Study of the possibility of measuring the moderator temperature coefficient using noise methods. Literature survey and measurement evaluation; 4. Transfer of the method for determining axial control rod elevation. Current situation and progress

  4. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  5. The Weyl law for contractive maps

    Science.gov (United States)

    Spina, Maria E.; Rivas, Alejandro M. F.; Carlo, Gabriel

    2013-11-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps.

  6. The Weyl law for contractive maps

    International Nuclear Information System (INIS)

    Spina, Maria E; Rivas, Alejandro M F; Carlo, Gabriel

    2013-01-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps. (paper)

  7. The research project on technical information basis for aging management in Fukui and Kinki area. Final report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Nagayama, Shigeru; Watarumi, Chikae; Toudou, Tsugihiko

    2011-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI) as a five-year program effectively, to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the technical strategy map for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants, 2) The development of inspection techniques to monitor the initiation and propagation of defects, 3) The development of a guideline for evaluating weld repair methods, 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2010, 11 continuing research subjects were proposed for this project and all were accepted. Of these, 5 subjects were related to the first topic (pipe thinning), 4 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  8. Co-ordinated research activities: Annual report and statistics for 2003

    International Nuclear Information System (INIS)

    2004-07-01

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. These co-ordinated research activities are normally implemented through Co-ordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. The Agency may also respond to proposals from institutes for participation in the research activities by awarding individual contracts not related to a CRP. A small portion of available funds is used to finance individual projects, which deal with topics covered by the Agency's scientific programme. The Agency also supports several Doctoral CRPs. This new, optional type of CRP has been designed to strengthen promotion of research on nuclear technologies in developing Member States through pair building between agreement holders and contract holders. These CRPs include a PhD training programme at the contract holders' institutions. Three doctoral CRPs are currently being carried out by the Human Health programme. Further information on the Agency's co-ordinated research activities, including current information on CRPs and programme areas supported, information on policies and procedures and the administration of the activities is contained in the Agency's website at http://www-crp.iaea.org. The co-ordinated research activities reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Material Technologies; Analysis for Sustainable

  9. Co-ordinated research activities: Annual report and statistics for 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-15

    Article III of the IAEA Statute authorises the Agency to encourage and assist research on, and development and practical application of, atomic energy for peaceful purposes throughout the world and to foster the exchange of scientific and technical information, as well as the exchange of scientists in the field of peaceful uses of atomic energy. The research supported by the Agency is within the framework of the Agency's programmes, sub-programmes and projects that are listed in the approved Programme and Budget of the Agency. These co-ordinated research activities are normally implemented through Co-ordinated Research Projects (CRPs) that bring together research institutes in both developing and developed Member States to collaborate on the research topic of interest. The Agency may also respond to proposals from institutes for participation in the research activities by awarding individual contracts not related to a CRP. A small portion of available funds is used to finance individual projects, which deal with topics covered by the Agency's scientific programme. The Agency also supports several Doctoral CRPs. This new, optional type of CRP has been designed to strengthen promotion of research on nuclear technologies in developing Member States through pair building between agreement holders and contract holders. These CRPs include a PhD training programme at the contract holders' institutions. Three doctoral CRPs are currently being carried out by the Human Health programme. Further information on the Agency's co-ordinated research activities, including current information on CRPs and programme areas supported, information on policies and procedures and the administration of the activities is contained in the Agency's website at http://www-crp.iaea.org. The co-ordinated research activities reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Material Technologies; Analysis for Sustainable

  10. Cross-disciplinary, authentic student research projects

    NARCIS (Netherlands)

    Heck, A.; Uylings, P.; Kędzierska, E.; Ellermeijer, T.

    2010-01-01

    In the Dutch secondary education system, students must carry out at the end of their school career a rather large research or design project to demonstrate their ability to apply acquired knowledge and skills while pursuing a research question or design goal in some depth. They are encouraged to

  11. Research projects in family medicine funded by the European Union.

    Science.gov (United States)

    Pavličević, Ivančica; Barać, Lana

    2014-01-01

    This study aimed at synthesizing funding opportunities in the field of family medicine by determining the number of family medicine projects, as well as number of project leaderships and/ or participations by each country. This was done in order to encourage inclusion of physicians in countries with underdeveloped research networks in successful research networks or to encourage them to form new ones. We searched the Community Research and Development Information Service project database in February 2013. Study covered the period from years 1992 - 2012, selecting the projects within the field of general/family medicine. The search was conducted in February 2013. First search conducted in the CORDIS database came up with a total of 466 projects. After excluding 241 projects with insufficient data, we analysed 225 remaining projects; out of those, 22 (9.8%) were in the field of family medicine and 203 (90.2%) were from other fields of medicine. Sorted by the number of projects per country, Dutch institutions had the highest involvement in family medicine projects and were partners or coordinators in 18 out of 22 selected projects (81.8%), followed by British institutions with 15 (68.8%), and Spanish with 10 projects (45.5%). Croatia was a partner in a single FP7 Health project. Research projects in family medicine funded by the European Union show significant differences between countries. Constant and high-quality international cooperation in family medicine is the prerequisite for improvement and development of scientific research and the profession. Copyright © 2014 by Academy of Sciences and Arts of Bosnia and Herzegovina.

  12. Laboratory technology research: Abstracts of FY 1998 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of the country: the world-class basic research capability of the DOE Office of Science (SC) national laboratories and the unparalleled entrepreneurial spirit of American industry. Projects supported by the LTR program in FY 1998 explore the applications of basic research advances relevant to DOE`s mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials, intelligent processing and manufacturing research, and environmental and biomedical research. Abstracts for 85 projects are contained in this report.

  13. Research coordination meeting of the coordinated research project on analytical and experimental benchmark analyses of accelerator driven systems. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The Technical Meeting hosted at the Belarus National Academy of Sciences in Minsk by the Joint Institute of Power Engineering and Nuclear Research 'SOSNY' from 5-9 December 2005 was the kick-off Research Coordination Meeting (RCM) of the IAEA Coordinated Research Project (CRP) on 'Analytical and Experimental Benchmark Analyses of Accelerator Driven Systems (ADS)'. The CRP had received proposals for research agreements and contracts from scientists representing the following 25 institutions: Centro Atomico Bariloche, SCK CEN Mol, Instituto de Pesquisas Energeticas e Nucleares Sao Paulo, Joint Institute of Power Engineering and Nuclear Research SOSNY Minsk, China Institute of Atomic Energy, CEA Cadarache, CNRS Paris, FZ Rossendorf, FZ Karlsruhe, Budapest University of Technology and Economics, Politecnico di Torino, Japan Atomic Energy Agency, Nuclear Research and Consultancy Group (NRG) Petten, Pakistan Institute of Nuclear Science and Technology, AGH-University of Science and Technology Krakow, Institute of Atomic Energy Otwock/Swierk, ITEP Moscow, MEPHI Moscow, Kurchatov Institute, JINR Dubna, Universidad Politecnica de Madrid, CIEMAT Madrid, Royal Institute of Technology Stockholm, National Science Center 'Kharkov Institute and Technology', and Argonne National Laboratory). These institutions represent 18 IAEA Member States (i.e., Argentina, Belarus, Belgium, Brazil, China, France, Germany, Hungary, Italy, Japan, Netherlands, Pakistan, Poland, Russia, Spain, Sweden, Ukraine, USA), and one International Organization (JINR Dubna). The overall objective of the CRP is contributing to the generic R and D efforts in various fields common to innovative fast neutron system development, i.e., heavy liquid metal thermal hydraulics, dedicated transmutation fuels and associated core designs, theoretical nuclear reaction models, measurement and evaluation of nuclear data for transmutation, and development and validation of calculational methods and codes. Ultimately, the CRP

  14. Campaign contributions, lobbying and post-Katrina contracts.

    Science.gov (United States)

    Hogan, Michael J; Long, Michael A; Stretesky, Paul B

    2010-07-01

    This research explores the relationship between political campaign contributions, lobbying and post-Hurricane Katrina cleanup and reconstruction contracts. Specifically, a case-control study design is used to determine whether campaign contributions to national candidates in the 2000-04 election cycles and/or the employment of lobbyists and lobbying firms increased a company's probability of receiving a post-hurricane contract. Results indicate that both a campaign contribution dichotomous variable and the dollar amount of contributions are significantly related to whether a company received a contract, but that lobbying activity was not. These findings are discussed in the context of previous research on the politics of natural disasters, government contracting and governmental and corporate deviance.

  15. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Saegusa, Hiromitsu; Sato, Toshinori; Umeda, Koji; Yasue, Kenichi; Asamori, Koichi; Osawa, Hideaki; Koide, Kaoru; Nagae, Isako; Natsuyama, Ryoko; Mizuno, Takashi; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Yokota, Hideharu; Ishii, Eiichi; Aoyagi, Kazuhei; Nakayama, Masashi; Ito, Hiroaki; Tsusaka, Kimikazu; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2015-08-01

    We have synthesised the research results from Mizunami/Horonobe URLs and geo-stability projects in the second mid-term research phase. It could be used as technical bases for NUMO/Regulator in each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High quality construction techniques and field investigation methods have been developed and implemented and these will be directly applicable to the National Disposal Program (along with general assessments of hazardous natural events and processes). It will be crucial to acquire technical knowledge on decisions of partial backfilling and final closure by actual field experiments in Mizunami/Horonobe URLs as main themes for the next phases. (author)

  16. Invalidity of contract: legislative regulation and types

    Directory of Open Access Journals (Sweden)

    Василь Іванович Крат

    2017-09-01

    Full Text Available Invalidity contracts always attracted attention researchers. Without regard to it, in modern conditions there is an enormous layer of the problems related to invalidity contract, that to require a doctrine and utilitarian comprehension. The article is sanctified to research invalidity contract. In the article analyses problems of the legislative regulation and types of invalidity contract through the prism of judicial practice. In the Civil code of Ukraine, a voidable contract sets as a common rule. A voidable of the contract is incarnated in the so-called «virtual» invalidity when only the most typical grounds are enumerated. However, even such approach does not allow to overcome all possible cases that arise up in practice. Such situation touches possibility of voidable contracts concluded with the purpose of to shut out the appeal of claim to the property of the debtor. Therefore it follows to set general rules in relation to voidable contracts of the debtor. A nullity of the contract takes place only in the case when there is the direct pointing of law on the qualification of that or another contract as the nullity. The nullity of contract in the Civil code of Ukraine is constructed by means of «textual» invalidity. There are no single attempts to use the construction of «virtual» invalidity in judicial practice when there is the direct pointing of law on the qualification of that or another contract as the nullity, that is impermissible. Methodologically incorrectly to carry out identifying of invalidity contract and obligation with the aim of providing of application of different after the rich in content filling norms.

  17. SAGE as a Source for Undergraduate Research Projects

    Science.gov (United States)

    Hutz, Benjamin

    2017-01-01

    This article examines the use of the computer algebra system SAGE for undergraduate student research projects. After reading this article, the reader should understand the benefits of using SAGE as a source of research projects and how to commence working with SAGE. The author proposes a tiered working group model to allow maximum benefit to the…

  18. Outline of criticality safety research project

    International Nuclear Information System (INIS)

    Kobayashi, Iwao; Tachimori, Shoichi; Suzaki, Takenori; Takeshita, Isao; Miyoshi, Yoshinori; Nakajima, Ken; Sakurai, Satoshi; Yanagisawa, Hiroshi

    1987-01-01

    As the power generation capacity of LWRs in Japan increased, the establishment and development of nuclear fuel cycle have become the important subject. Conforming to the safety research project of the nation, the Japan Atomic Energy Research Institute has advanced the project of constructing a new research facility, that is, Nuclear Fuel Cycle Engineering Research Facility (NUCEF). In this facility, it is planned to carry out the research on criticality safety, upgraded reprocessing techniques, and the treatment and disposal of transuranium element wastes. In this paper, the subjects of criticality safety research and the research carried out with a criticality safety experiment facility which is expected to be installed in the NUCEF are briefly reported. The experimental data obtained from the criticality safety handbooks and published literatures in foreign countries are short of the data on the mixture of low enriched uranium and plutonium which is treated in the reprocessing of spent fuel from LWRs. The acquisition of the criticality data for various forms of fuel, the elucidation of the scenario of criticality accidents, and the soundness of the confinement system for gaseous fission products and plutonium are the main subjects. The Static Criticality Safety Facility, Transient Criticality Safety Facility and pulse column system are the main facilities. (Kako, I.)

  19. Research and development at PSI and collaboration with Nagra

    International Nuclear Information System (INIS)

    Hadermann, J.; Hagenlocher, I.

    1997-01-01

    PSI has been involved in all of Nagra's milestone projects to date (Project Gewaehr 1985, Kristallin-I synthesis, general licence application Wellenberg) and the fruitful research collaboration between the two organisations will continue in the future (e.g. with Project Entsorgungsnachweis). A research contract between the two partners specifies the areas of work covered by the collaboration, namely: waste matrices, repository near-field, repository far-field and performance assessment. Cost which arise are borne by the partners in equal shares. (author) 6 figs

  20. Research and investigation on medical usage of cyclotrons as a special research project

    International Nuclear Information System (INIS)

    1980-01-01

    In the National Institute of Radiological Sciences, the special research project ''Research and investigation on the medical usage of cyclotrons'' had been carried out in the three years program from fiscal 1976 to 1978. Its purpose was to establish the methods of therapy using particle beam such as fast neutrons and the methods of diagnosis using short-lived radioisotopes and positron-emitting radioisotopes. The works were conducted comprehensively in cooperation of the personnel both in and outside the NIRS. Consequently, the purpose was able to be fulfilled satisfactorily. Following on this project, a new special research project ''Research and investigation on the medical usage of particle accelerators'' was started in fiscal 1979. These results are described on the effects of the therapy, diagnostic utilizations, and the medical usage of heavy ion accelerators. (J.P.N.)

  1. FY 1997 report of survey on the intellectual property in international collaboration research project; 1997 nendo chosa hokokusho (kokusai kyodo kenkyu ni okeru chiteki zaisanken ni tsuite no chosa hokokusho)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    In promoting international collaboration research project, coordination of the patent system of each country which participants to the project belong to has broad implications in concluding the contract for the project. For example, in Japan, 100% of the patent belongs to the government for contrast or collaboration project with the government. While, in the USA, the patent developed by the private company belongs to the private company even for the contrast project. In Japan, the shared patent can not be transferred to the third party or implemented without agreement with the partner. While, in the USA, the shared patent can be transferred to the third party or implemented without agreement with the partner. Due to such a difference, some projects can not be established by ill coordination of intellectual property even when the meaning of the projects is well understood. In this survey, was investigated the outline of patent systems of major countries to study about what should well balanced treatment of intellectual property in international collaboration research project be in the future. 4 figs., 8 tabs.

  2. Building Information Modelling and Standardised Construction Contracts: a Content Analysis of the GC21 Contract

    Directory of Open Access Journals (Sweden)

    Aaron Manderson

    2015-08-01

    Full Text Available Building Information Modelling (BIM is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle is yet to occur. One commonly identified barrier to BIM adoption is the perceived legal risks associated with its integration, coupled with the need for implementation in a collaborative environment. Many existing standardised contracts used in the Australian AEC industry were drafted before the emergence of BIM. As BIM continues to become ingrained in the delivery process the shortcomings of these existing contracts have become apparent. This paper reports on a study that reviewed and consolidated the contractual and legal concerns associated with BIM implementation. The findings of the review were used to conduct a qualitative content analysis of the GC21 2nd edition, an Australian standardised construction contract, to identify possible changes to facilitate the implementation of BIM in a collaborative environment. The findings identified a number of changes including the need to adopt a collaborative contract structure with equitable risk and reward mechanisms, recognition of the model as a contract document and the need for standardisation of communication/information exchange.

  3. US heat pump research and development projects, 1976-1986

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  4. Research ethics in the era of personalized medicine: updating science's contract with society.

    Science.gov (United States)

    Meslin, Eric M; Cho, Mildred K

    2010-01-01

    With the completed sequence of the human genome has come the prospect of substantially improving the quality of life for millions through personalized medicine approaches. Still, any advances in this direction require research involving human subjects. For decades science and ethics have enjoyed an allegiance reflected in a common set of ethical principles and procedures guiding the conduct of research with human subjects. Some of these principles emphasize avoiding harm over maximizing benefit. In this paper we revisit the priority given to these ethical principles - particularly the principles that support a cautious approach to science - and propose a reframing of the 'social contract' between science and society that emphasizes reciprocity and meeting public needs.

  5. Commercial agreements and documentation relevant for project financing renewable energy schemes

    International Nuclear Information System (INIS)

    1997-01-01

    Renewable energy projects covered by the NFFO Orders are distinguished by the fact that the key contract in any project is in effect a standard form contract in the form of the Power Purchase Agreement with the Non-Fossil Purchasing Agency Limited (''NFPA''). However our research has indicated that general contract standardization is unlikely to be practicable in the short term, although it is thought that the production of a range of specimen documents in the context of this study with input from various representative industry associations could lead to a more consistent approach to the negotiation and structuring of projects and facilitate the presentation of projects at the funding stage. We have produced a suite of documents which are specimens of the sorts of agreements that lenders are likely to find acceptable. The range of documents which we have produced covers the principal contractual arrangements for a typical renewable energy project (including full text or abridged agreements), for a land lease and for agreements for design and build, operation and maintenance, waste supply, wind lease, landfill gas, and forestry residue supply. We have produced an insurance scope of cover and financing documentation including a due diligence check list, term sheet, and a facility agreement with related security documentation. (author)

  6. Towards efficient use of research resources: a nationwide database of ongoing primary care research projects in the Netherlands.

    Science.gov (United States)

    Kortekaas, Marlous F; van de Pol, Alma C; van der Horst, Henriëtte E; Burgers, Jako S; Slort, Willemjan; de Wit, Niek J

    2014-04-01

    PURPOSE. Although in the last decades primary care research has evolved with great success, there is a growing need to prioritize the topics given the limited resources available. Therefore, we constructed a nationwide database of ongoing primary care research projects in the Netherlands, and we assessed if the distribution of research topics matched with primary care practice. We conducted a survey among the main primary care research centres in the Netherlands and gathered details of all ongoing primary care research projects. We classified the projects according to research topic, relation to professional guidelines and knowledge deficits, collaborative partners and funding source. Subsequently, we compared the frequency distribution of clinical topics of research projects to the prevalence of problems in primary care practice. We identified 296 ongoing primary care research projects from 11 research centres. Most projects were designed as randomized controlled trial (35%) or observational cohort (34%), and government funded mostly (60%). Thematically, most research projects addressed chronic diseases, mainly cardiovascular risk management (8%), depressive disorders (8%) and diabetes mellitus (7%). One-fifth of the projects was related to defined knowledge deficits in primary care guidelines. From a clinical primary care perspective, research projects on dermatological problems were significantly underrepresented (P = 0.01). This survey of ongoing projects demonstrates that primary care research has a firm basis in the Netherlands, with a strong focus on chronic disease. The fit with primary care practice can improve, and future research should address knowledge deficits in professional guidelines more.

  7. NASA's Morphing Project Research Summaries in Fiscal Year 2002

    Science.gov (United States)

    McGowan, Anna-Maria R.; Waszak, Martin R.

    2005-01-01

    The Morphing Project at the National Aeronautics and Space Agency s (NASA) Langley Research Center (LaRC) is part of the Breakthrough Vehicle Technologies Project, Vehicle Systems Program that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing Project are to develop and assess the advanced technologies and integrated component concepts to enable efficient, multi-point adaptability of flight vehicles; primarily through the application of adaptive structures and adaptive flow control to substantially alter vehicle performance characteristics. This document is a compilation of research summaries and other information on the project for fiscal year 2002. The focus is to provide a brief overview of the project content, technical results and lessons learned. At the time of publication, the Vehicle Systems Program (which includes the Morphing Project) is undergoing a program re-planning and reorganization. Accordingly, the programmatic descriptions of this document pertain only to the program as of fiscal year 2002.

  8. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project (Translated document)

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Onoe, Hironori; Sato, Toshinori; Yasue, Kenichi; Asamori, Koichi; Niwa, Masakazu; Osawa, Hideaki; Nagae, Isako; Natsuyama, Ryoko; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Takeda, Masaki; Aoyagi, Kazuhei; Nakayama, Masashi; Miyakawa, Kazuya; Ito, Hiroaki; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2016-08-01

    We have synthesized the research results from the Mizunami/Horonobe Underground Research Laboratories (URLs) and geo-stability projects in the second mid-term research phase. This report can be used as a technical basis for the Nuclear Waste Management Organization of Japan/Regulator at each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High-quality construction techniques and field investigation methods have been developed and implemented, which will be directly applicable to the National Disposal Program (together with general assessments of hazardous natural events and processes). Acquisition of technical knowledge on decisions of partial backfilling and final closure from actual field experiments in the Mizunami/Horonobe URLs will be crucial as the main theme for the next phases. (author)

  9. Pressure Scalings and Influence Region Research

    Science.gov (United States)

    2018-01-01

    AFRL-RQ-WP-TP-2018-0015 PRESSURE SCALINGS AND INFLUENCE REGION RESEARCH James H. Miller High Speed Systems Division...inside pages STINFO COPY AIR FORCE RESEARCH LABORATORY AEROSPACE SYSTEMS DIRECTORATE WRIGHT-PATTERSON AIR FORCE BASE, OH... RESEARCH 5a. CONTRACT NUMBER In-house 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62201F 6. AUTHOR(S) James H. Miller 5d. PROJECT NUMBER

  10. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  11. Laboratory Technology Research: Abstracts of FY 1996 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of this country: the world-class basic research capability of the DOE Energy Research (ER) multi-program national laboratories and the unparalleled entrepreneurial spirit of American industry. Projects supported by the LTR program are conducted by the five ER multi-program laboratories: Argonne, Brookhaven, Lawrence Berkeley, Oak Ridge, and Pacific Northwest National Laboratories. These projects explore the applications of basic research advances relevant to Department of Energy`s (DOE) mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials, intelligent processing/manufacturing research, and sustainable environments.

  12. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  13. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  14. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studie...... and professional self-reflection amongst students are improved....

  15. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  16. Catalogue of research projects

    International Nuclear Information System (INIS)

    Skarp, K.

    1993-01-01

    The Centre for Materials Science serves as an umbrella for organizations involved in materials research at the two Universities and at certain branch institutes in the Gothenburg region. The general goal of the Centre is to promote materials research among the member organizations and to provide a link to industry and to the society at large. Members of the Centre work on most aspects of modern materials research, ranging from single-atom manipulation and theoretical simulations to biomaterials and production engineering. In order to give a presentation of the members and their research, the Centre produces an inventory of materials research projects approximately every four years. The 1993 issue is somewhat more extensive than previous editions, detailing e.g. also scientific equipment and listing work published during the past four years. The register covers the following main headings: General materials and surface science; Materials chemistry; Polymers and fibres; Biomaterials; Clusters and fine particles; Electronic and opto-electronic materials; Superconductors and nanometer structures; Ceramics; Metals; Building materials; Production and materials processing

  17. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  18. Lessons learned : pavement marking warranty contract.

    Science.gov (United States)

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  19. Study on development of evaluation technique of in-situ tracer test in Horonobe Underground Research Laboratory project (Contract research)

    International Nuclear Information System (INIS)

    Yokota, Hideharu; Amano, Kenji; Maekawa, Keisuke; Kunimaru, Takanori; Naemura, Yumi; Ijiri, Yuji; Motoshima, Takayuki; Suzuki, Shunichi; Teshima, Kazufumi

    2013-06-01

    In the Horonobe Underground Research Laboratory Project, in-situ tracer tests are valuable and important as the investigations to obtain the mass transportation data of fractures in hostrock. However, it is difficult that the in-situ tests are executed under various conditions due to long test period and the tests results are evaluated about permeable heterogeneity in a fracture and/or scale effects. In this study, a number of tracer tests are simulated in a fictitious single plate fracture generated on computer. And the transport parameters are identified by fitting one- and two-dimensional models to the breakthrough curves obtained from the simulations in order to investigate the applicability of these models to the evaluation of in-situ tracer test. As a result, one-dimensional model yields larger longitudinal dispersion length than two-dimensional model in the both cases of homogeneous and heterogeneous hydraulic conductivity fields of the fictitious fracture. This is because that the effect of transverse dispersion has to be included in the longitudinal dispersion length parameter in the one-dimensional model. It is also found that the larger dipole ratio and the larger natural groundwater flow crossing the flow generated between two boreholes make the identified longitudinal dispersion length larger. And, the longitudinal dispersion length identified from a tracer test is smaller and/or larger than the macroscopic longitudinal dispersion length identified from whole fracture. It is clarified that these are occurred by shorter or longer distance between boreholes compare to the correlation length of geostatistical heterogeneity of fictitious fracture. (author)

  20. Light water reactor safety research project

    International Nuclear Information System (INIS)

    Markoczy, G.; Aksan, S.N.; Behringer, K.; Prodan, M.; Stierli, F.; Ullrich, G.

    1980-07-01

    The research and development activities for the safety of Light Water Power Reactors carried out 1979 at the Swiss Federal Institute for Reactor Research are described. Considerations concerning the necessity, objectives and size of the Safety Research Project are presented, followed by a detailed discussion of the activities in the five tasks of the program, covering fracture mechanics and nondestructive testing, thermal-hydraulics, reactor noise analysis and pressure vessel steel surveillance. (Auth.)

  1. Annual review of research projects 1984

    International Nuclear Information System (INIS)

    Keam, D.W.

    1986-02-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  2. Annual review of research projects 1983

    International Nuclear Information System (INIS)

    1985-08-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  3. Methodology for evaluation of railroad technology research projects

    Science.gov (United States)

    1981-04-01

    This Project memorandum presents a methodology for evaluating railroad research projects. The methodology includes consideration of industry and societal benefits, with special attention given to technical risks, implementation considerations, and po...

  4. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  5. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1992-06-01

    This is the latest in a series of Project Summary books going back to 1976 and is the first after a hiatus of several years. They are published to provide a short description of each project supported by the Experimental Plasma Research Branch of the Division of Applied Plasma Physics in the Office of Fusion Energy. The Experimental Plasma Research Branch seeks to provide a broad range of experimental data, physics understanding, and new experimental techniques that contribute to operation, interpretation, and improvement of high temperature plasma as a source of fusion energy. In pursuit of these objectives, the branch supports research at universities, DOE laboratories, other federal laboratories and industry. About 70 percent of the funds expended are spent at universities and a significant function of this program is the training of students in fusion physics. The branch supports small- and medium-scale experimental studies directly related to specific critical plasma issues of the magnetic fusion program. Plasma physics experiments are conducted on transport of particles and energy within plasma and innovative approaches for operating, controlling, and heating plasma are evaluated for application to the larger confinement devices of the magnetic fusion program. New diagnostic approaches to measuring the properties of high temperature plasmas are developed to the point where they can be applied with confidence on the large-scale confinement experiments. Atomic data necessary for impurity control, interpretation of diagnostic data, development of heating devices, and analysis of cooling by impurity ion radiation are obtained. The project summaries are grouped into these three categories of plasma physics, diagnostic development and atomic physics

  6. An Evaluation of the Lower Rio Grande Valley Contracts with Non-VA Providers

    National Research Council Canada - National Science Library

    Piihl, Janet

    1999-01-01

    ... (DRGs with a HCFA average length of stay of three days or less). Surprisingly, four months after the contracts were implemented actual utilization of the contracts was significantly lower than projected...

  7. Work Hours as a Moderator of the Relationship between Developmental Human Resource Management Practices and the Psychological Contract: A Multilevel Investigation

    OpenAIRE

    Håkensen, Katrine

    2014-01-01

    Purpose & background – The purpose of this study was to examine if part-time and full-time employees differ in terms of psychological contract content according to level of developmental HRM practices. The study adds to an ongoing research project Organizational antecedents of psychological contracts and work-related outcomes , run by Sabine Raeder, University of Oslo in cooperation with José María Peiró, University of Valencia, Spain. Design & methodology – A survey of 463 employees from 35...

  8. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  9. The research project on technical information basis for aging management in Fukui and Kinki area (2nd report)

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2009-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in 2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experience and results of the participating organizations were considered and the following four topics were extracted. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants. 2) The development of inspection techniques to monitor the initiation and propagation of defects. 3) The development of a guideline for evaluating weld repair methods. 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as of coordinator to make a contracts, facilitate execution, and compile annual reports. In FY2008, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects were related to the second topic (inspection technique) and I subject was related to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  10. The research project on technical information basis for aging management in Fukui and Kinki area. 3rd report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2010-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. (1) The improvement of pipe thinning management in nuclear power plants, (2) The development of inspection techniques to monitor the initiation and propagation of defects, (3) The development of a guideline for evaluating weld repair methods, (4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2009, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  11. Ethics issues experienced in HBM within Portuguese health surveillance and research projects

    Directory of Open Access Journals (Sweden)

    Miguel J Pereira

    2008-01-01

    Full Text Available Abstract Background In keeping with the fundamental practice of transparency in the discussion and resolution of ethics conflicts raised by research, a summary of ethics issues raised during Portuguese biomonitoring in health surveillance and research is presented and, where applicable, their resolution is described. Methods Projects underway aim to promote the surveillance of public health related to the presence of solid waste incinerators or to study associations between human exposure to environmental factors and adverse health effects. The methodological approach involves biomonitoring of heavy metals, dioxins and/or other persistent organic pollutants in tissues including blood, human milk and both scalp and pubic hair in groups such as the general population, children, pregnant women or women attempting pregnancy. As such, the projects entail the recruitment of individuals representing different demographic and health conditions, the collection of body tissues and personal data, and the processing of the data and results. Results The issue of autonomy is raised during the recruitment of participants and during the collection of samples and data. This right is protected by the requirement for prior written, informed consent from the participant or, in the case of children, from their guardian. Recruitment has been successful, among eligible participants, in spite of incentives rarely being offered. The exception has been in obtaining guardians' consent for children's participation, particularly for blood sampling. In an attempt to mitigate the harm-benefit ratio, current research efforts include alternative less invasive biomarkers. Surveys are currently being conducted under contract as independent biomonitoring actions and as such, must be explicitly disclosed as a potential conflict of interests. Communication of results to participants is in general only practised when a health issue is present and corrective action possible

  12. Clemson Apparel Research. Years 4 and 5 Demonstration Contract

    National Research Council Canada - National Science Library

    Kernodle, Joseph

    2001-01-01

    The purpose of this contract is to develop and demonstrate modern technologies and management practices that optimize the performance of the Department of Defense's Clothing and Textile's supply chain...

  13. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  14. Integration of Multiple Contractors with Performance Type of Contracts

    International Nuclear Information System (INIS)

    BURDGE, L.F.

    2000-01-01

    The management practices, procedures, and processes that are suited to managing Management and Operation (MandO) type of contracts at Department of Energy (DOE) sites, which were cost reimbursement with award fee, are not well suited to managing contracts where fee is determined by performance metrics. Thus a different style of management, requiring substantial revamping of the management process, is needed. This shift in philosophy also requires a dramatic shift in culture. This paper will describe how these changes are being managed at the River Protection Project (RPP), located at the DOE's Hanford Site in Washington State, one of DOE's largest and highest risk environmental clean-up project

  15. Joint development utility and university and utility and research center

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, Roberto del Giudice R.; Valgas, Helio Moreira [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This paper shows the background acquired by CEMIG in dealing with projects associated with R and D (Research and Development), carried out as a result of the establishment of contracts or governants with universities and research center for direct application on the solution of problems related to the operation of the system, within the scope of electrical operation planning. The various aspects of a project of this nature such as legal questions, characterization of a contract or a covenant, main developments and new opportunity areas should be covered. Finally the subject shall be dealt with under the Total Quality approach, involving the proposition of control items associated to the process and goals to be reached. (author) 7 refs., 2 figs.

  16. Blockchain-based Smart Contracts: A Systematic Mapping Study

    OpenAIRE

    Alharby, Maher; van Moorsel, Aad

    2017-01-01

    An appealing feature of blockchain technology is smart contracts. A smart contract is executable code that runs on top of the blockchain to facilitate, execute and enforce an agreement between untrusted parties without the involvement of a trusted third party. In this paper, we conduct a systematic mapping study to collect all research that is relevant to smart contracts from a technical perspective. The aim of doing so is to identify current research topics and open challenges for future stu...

  17. The Universities and JAERI joint research project. The achievements and prospects

    International Nuclear Information System (INIS)

    Ohashi, Hiroshi; Nakamura, Takashi; Yamaguchi, Sadaei

    1999-01-01

    The universities and JAERI joint research project has been carried out since 13 years ago on an equivalent basis with the universities and JAERI and co-ownership of the results. This paper consists of the history and results of research project and evaluation. The significance, characteristics, themes and problems of the project are arranged. The main results and the future of the project are explained. Two large projects such as the backend chemical project and the high-degree application of radiation project have been studied. The backend chemical project consisted of four themes; the nuclear chemical researches for TRU recycle, the solid chemical research of nuclear fuel and waste, new separation method for reprocessing and waste disposal and the fundamental chemical researches for disposal waste. The high-degree application of radiation project have eight themes; effects of ion beam on organism, slow positron generation and its application to materials, ion irradiation effects on polymer materials, nuclear spectroscopy and nuclear physics of isotope using online isotope separator, shield and behavior of accelerator radiation, materials analysis by ion beam, effects of nuclear transformation product by nuclear fusion reactor radiation damage and biofunction analysis of plant using positron release nuclide. (S.Y.)

  18. RODOS User's Group: Final project report. Contract number: F14P- CT98-0075

    International Nuclear Information System (INIS)

    Sinkko, K.; Ammann, M.

    2001-03-01

    Prior to 1998, the development of RODOS, a decision support system designed for the management of nuclear emergencies, had been carried out almost entirely by research scientists and engineers. The end-users/operators had little or no input into this development. To redress this situation, the RODOS Users Group (RUG) was established in 1998 under a Concerted Action Contract between the European Commission and STUK. The main objectives of this group were to encourage the emergency management community to use such a system, to provide a forum for end-users to share their experience in the use of such systems and to provide feedback from the end-users to the model and system developers in regard to operational problems and required improvements. The contract, which commenced on 1st September 1998, was for a period of two years. During this period, RUG established a www homepage, planned and performed two nuclear accident exercises and held four meetings. Technically the Web page operated very well. State-of-the-art Internet technology provided an efficient communication channel at low cost. The membership of the RUG was, however, too low to maintain a lively and ongoing discussion in parallel with the RODOS project Web page. This experience would suggest that it might have been better to have operated a Web page for RUG on the RODOS project Web-site rather than an independent RUG Web-site. Exercises based on fixed accident scenarios proved to be an appropriate means of highlighting issues that needed to be discussed between users and developers and to stimulate and motivate the end-users to maintain and further develop the system. Such exercises also promoted further activity in the field of emergency management. The organisation and administration of realistic exercises are time consuming, laborious and expensive. It is therefore very important that the maximum benefit is achieved from such exercises. The use of analytical evaluation methods could be better employed

  19. Minnesota wood energy scale-up project 1994 establishment cost data

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M. [Oak Ridge National Lab., TN (United States); Pierce, R. [Champion International, Alexandria, MN (United States); Kroll, T. [Minnesota Department of Natural Resources-Forestry, St. Cloud, MN (United States)

    1996-03-18

    The Minnesota Wood Energy Scale-up Project began in late 1993 with the first trees planted in the spring of 1994. The purpose of the project is to track and monitor economic costs of planting, maintaining and monitoring larger scale commercial plantings. For 15 years, smaller scale research plantings of hybrid poplar have been used to screen for promising, high-yielding poplar clones. In this project 1000 acres of hybrid poplar trees were planted on Conservation Reserve Program (CRP) land near Alexandria, Minnesota in 1994. The fourteen landowners involved re-contracted with the CRP for five-year extensions of their existing 10-year contracts. These extended contracts will expire in 2001, when the plantings are 7 years old. The end use for the trees planted in the Minnesota Wood Energy Scale-up Project is undetermined. They will belong to the owner of the land on which they are planted. There are no current contracts in place for the wood these trees are projected to supply. The structure of the wood industry in the Minnesota has changed drastically over the past 5 years. Stumpage values for fiber have risen to more than $20 per cord in some areas raising the possibility that these trees could be used for fiber rather than energy. Several legislative mandates have forced the State of Minnesota to pursue renewable energy including biomass energy. These mandates, a potential need for an additional 1700 MW of power by 2008 by Northern States Power, and agricultural policies will all affect development of energy markets for wood produced much like agricultural crops. There has been a tremendous amount of local and international interest in the project. Contractual negotiations between area landowners, the CRP, a local Resource Conservation and Development District, the Minnesota Department of Natural Resources and others are currently underway for additional planting of 1000 acres in spring 1995.

  20. Structural requirements of research tissue banks derived from standardized project surveillance.

    Science.gov (United States)

    Herpel, E; Koleganova, N; Schreiber, B; Walter, B; Kalle, C V; Schirmacher, P

    2012-07-01

    Tissue banks constitute decisive and rate-limiting resource and technology platforms for basic and translational biomedical research, notably in the area of cancer. Thus, it is essential to plan and structure tissue banking and allocate resources according to research needs, but essential requirements are still incompletely defined. The tissue bank of the National Center of Tumor Diseases Heidelberg (NCT) was founded with the intention to provide tissues of optimal quality and to prioritize the realization of research projects. We analysed its structure and prospective project management registration as well as tracking records for all projects of the NCT tissue bank as of its start in 2005 in order to obtain information that may be relevant for tissue bank planning. All project proposals submitted to the NCT tissue bank (n = 681) were included in the study. For a detailed evaluation of provided services, only projects that were completed until July 2011 (n = 605) were analysed. For these 605 projects, NCT tissue bank provided 769 specific services. In all projects/services, we recorded project leader, type and amount of material provided, type of research (basic/translational), work load of project and project completion. Furthermore, all completed projects were tracked after 90 days according to a standard protocol to determine principal investigators' (PI) satisfaction and quality of the provided material. Until July 2011, 605 projects had been successfully completed as documented by material transfer agreement. Of the projects, 72.7 % addressed basic research, 22.3 % were translational research projects and 3 % concerned epidemiological research; 91 % (n = 546) concerned a single PI and the NTC tissue bank. For these projects, 769 specific services were provided. Of these services, 288 concerned providing formalin-fixed and paraffin-embedded (FFPE) tissue (extracts, full size sections), 126 providing fresh frozen materials (including fresh frozen

  1. The CARE project (Coordinated Accelerator Research in Europe)

    International Nuclear Information System (INIS)

    Napoly, Olivier

    2006-01-01

    CARE, an ambitious and coordinated project of accelerator research and developments oriented towards High Energy Physics projects, has been launched in January 2004 by the main European laboratories and the European Commission with the 6th Framework Programme. This project aims at improving existing infrastructures dedicated to future projects such as linear colliders, upgrades of hadron colliders and high intensity proton drivers An important part of this programme is devoted to advancing the performance of the superconducting technology, both in the fields of RF cavities for electron and proton acceleration and of high field magnets, as well as to developing high intensity electron and proton injectors. We describe the plans of the four main Joint Research Activities and report on the results and progress obtained so far. The CARE project also includes three adjacent Networking Activities whose main goal is to organize a forum of discussions and to provide the strategic plans in the fields of the Linear Collider, intense Neutrino Beams, and future Hadron Colliders

  2. Clemson Apparel Research Demonstration Contract. Years 6 and 7

    National Research Council Canada - National Science Library

    Kernodle, Joseph

    2003-01-01

    The purpose of this contract is to develop and demonstrate modern technologies and management practices that optimize the performance of the Department of Defense's Clothing and Textiles (C&T) supply chain...

  3. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  4. Compilation of contract research for the Materials Engineering Branch, Division of Engineering Technology. Annual report for FY 1982

    International Nuclear Information System (INIS)

    1983-03-01

    This report presents summaries of the research work performed during Fiscal Year 1982 by laboratories and organizations under contracts administered by the NRC's Materials Engineering Branch, Office of Nuclear Regulatory Research. The contractor reports are organized into the major areas of concern to Primary System Integrity: Vessel and Piping Fracture Mechanics; Pressure Vessel Surveillance Dosimetry; Steam Generators and Environmental Cracking; and Nondestructive Examination

  5. Researching the potentials and limitations of contract farming in sub-Saharan Africa

    DEFF Research Database (Denmark)

    Kuzilwa, Joseph A.; Fold, Niels; Henningsen, Arne

    2017-01-01

    Contract farming has received renewed attention recently as developing economies try to grapple with how to transform the agricultural sector and its associated value chains. This book examines different contract arrangements for selected crops, applying both qualitative and quantitative approach...

  6. Radiation protection research projects. Program report 2015. Report on research program radiation protection of the Federal ministry for environment, nature conservation and reactor safety with technical and administrative steering by the Bundesamt fuer Strahlenschutz; Strahlenschutzforschung. Programmreport 2015. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz, Bau und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Schmitt-Hannig, Annemarie; Loebke-Reinl, Angelika; Peter, Josef; Goedde, Ralph; Hachenberger, Claudia; Trugenberger-Schnabel, Angela (comps.)

    2016-08-15

    On behalf of the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. The tasks of the Federal Office for Radiation Protection involve planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects. This report provides information on results, i. e. preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMUB's Environmental Research Plan for the year 2015.

  7. Research on bidding quotation game of international project

    Science.gov (United States)

    Lin, Tao; Xu, Xin

    2017-04-01

    Bidding competition of international projects is more and more fierce currently. However, China started late relatively in the field, it is still lack of experience in the aspect of participation in bidding of international projects, and more effective bidding quotation system is not formed till present. Therefore, China can not win through systemic bidding quotation methods compared with many powerful bidding enterprises in the international field. Research on the field is also focused by many aspects as a result. It is urgent to solve related problems. Game theory is combined for analyzing the effectiveness and operability of bidding quotation models mainly based on current situation of bidding market in China international projects during research process in the paper. The research starts with the perspective of bidders for analyzing their game with tenderers and other bidders. The results have operational value aiming at bidders.

  8. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  9. Report on the third research co-ordination meeting of the coordinated research project: 'The development of strategies for the effective monitoring of veterinary drug residues in livestock and livestock products in developing countries' (D3.20.22)

    International Nuclear Information System (INIS)

    2005-01-01

    The third RCM for the CRP on the development of strategies for the effective monitoring of veterinary drug residues in livestock and livestock products in developing countries was held in Natal, Brazil, from 11-15 April 2005. The meeting was attended by ten Research Contract Holders, a second representative of the research group of the host country, two Research Agreement Holders, two Technical Contract Holders and the Scientific Secretary. The work in the second phase of this CRP has built upon the progress reported from the first phase, resulting in good quality immunoassay reagents, confirmatory methods and a number of validated methods. It is recommended that all contracts (with one exception), including technical contracts, be renewed to facilitate the completion of the work plans agreed at the meeting. A protocol for the validation of immunoassays will be provided by a Research Agreement Holder. The protocol has already been successfully applied for validation of an RIA method in Brazil. It is recommended that this protocol be adopted by all participants in the project to harmonize the validation of immunoassay methods developed. Work on the development of the 125 I-radioimmunoassay for chloramphenicol has not been satisfactory. It is recommended that this work is transferred to the research group in Brazil. The meeting agreed that the FAO/IAEA Joint Division's INFOCRIS database and associated e-learning modules are a very useful resource for developing country scientists. It is recommended to proceed with the expansion of the database as planned. In addition, it was suggested that a database and bibliography of original literature on, for example, pharmacokinetic and metabolism studies on veterinary drugs and hormonal growth promoters should be included. Much of this data was published many years ago and is very difficult to access, but is of importance in the design and development of methods. Some of the results generated by CRP participants should be

  10. Information Systems Development Contracts: an exploratory study of Australian legal practitioners' and Information Systems professionals' perceptions

    Directory of Open Access Journals (Sweden)

    Phil Joyce

    2003-05-01

    Full Text Available IS professionals are primarily concerned with the development of a project to meet the goals of a client. Unfortunately, IS professional do not always pay close attention to the contract or to its management and are often unaware of the legal implications of the contracts to which they are assenting. Legal advice can be sought during pre-contractual processes to help ensure that the contract meets the expectations of all the parties. If the project does not meet stakeholder’s expectations, thus causing a contract to come into dispute, lawyers may be called in to review the contract and to seek a settlement. This paper reports an exploratory study of the differences in perceptions of IS development contracts that exist between IS professionals and legal practitioners.

  11. Experiences with project-oriented research in graduate engineering education

    International Nuclear Information System (INIS)

    Miley, G.H.

    1976-01-01

    Two examples of project-oriented research that involve the conceptual design of fusion systems are described. One of these projects involved close collaboration with workers in a national laboratory while the second was formally organized as a cooperative effort with two other laboratories. An important educational aspect of such research is that the students are involved in a design team composed of both students and professionals facing a realistic problem. In retrospect, it appears that both students and faculty profited from the experience. Several students have taken jobs in related areas, and additional research has resulted at the University from new insight gained during the projects

  12. United States Crystalline Repository Project - key research areas

    International Nuclear Information System (INIS)

    Patera, E.S.

    1986-01-01

    The Crystalline Repository Project is responsible for siting the second high-level nuclear waste repository in crystalline rock for the US Department of Energy. A methodology is being developed to define data and information needs and a way to evaluate that information. The areas of research the Crystalline Repository Project is involved in include fluid flow in a fractured network, coupled thermal, chemical and flow processes and cooperation in other nations and OECD research programs

  13. Identifying key performance indicators in food technology contract R&D

    NARCIS (Netherlands)

    Flipse, S.M.; Sanden, van der M.C.A.; Velden, van der T.; Fortuin, F.T.J.M.; Omta, S.W.F.; Osseweijer, P.

    2013-01-01

    Innovating companies increasingly rely on outsourcing to Contract Research Organisations (CROs) for their Research and Development (R&D), which are largely understudied. This paper presents the outcome of a case study in the field of food technology contract research, identifying context

  14. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  15. Values underlying perceptions of breach of the psychological contract

    Directory of Open Access Journals (Sweden)

    Leon Botha

    2010-10-01

    Research purpose: The study identifies the most important breaches and investigates which values underlie employee perceptions of breach of the psychological contract. It also addresses values that lead to employees interpreting incidents as breaches. Motivation for the study: The study calls on the fact that employees make inconsequential contributions to the terms of many formal employment contracts may imply that such contracts cannot be viewed as documents between equals. Research design, approach and method: The study identifies the most prominent breaches of the psychological contract and the values underlying the perceptions that violations have occurred. Main findings: The data revealed lack of promotion, poor interpersonal relations between colleagues and bad treatment by seniors as three main breaches of the contract, and social recognition, world of peace and sense of accomplishment as three dominant values that underlie perceptions of contract violation. Practical/managerial implications: The competent and intelligent manner in which lack of promotion is handled and communicated to employees is vital because it has implications for their willingness to contribute, their career prospects and their intention to stay in the organisation. Contribution/value-add: This research can serve as the basis for the development of survey or research instruments that are appropriate and relevant to the population.

  16. Compilation of contract research for the Materials Branch, Division of Engineering Safety: Annual report for FY 1986

    International Nuclear Information System (INIS)

    1987-03-01

    This report presents summaries of the research work performed during Fiscal Year 1986 by laboratories and organizations under contracts administered by the NRC's Materials Branch, Office of Nuclear Regulatory Research. Each contractor has written a more complete and detailed annual report of their work which can be obtained by writing to NRC; however, we believe it is useful to have a summary of each contractor's efforts for the year combined into one volume

  17. Farmers' Preferences for PES Contracts to Adopt Silvopastoral Systems in Southern Ecuador, Revealed Through a Choice Experiment.

    Science.gov (United States)

    Raes, Leander; Speelman, Stijn; Aguirre, Nikolay

    2017-08-01

    This study investigates farmers' preferences to participate in payment contracts to adopt silvopastoral systems in Ecuador. A choice experiment was used to elicit preferences between different contract attributes, including differing payment amounts and land management requirements. The research was carried out in the buffer zone of Podocarpus National Park in Southern Ecuador, an area where most land is dedicated to cattle husbandry. A choice experiment was conducted to measure farmers' interest in different types of contracts. Based on existing incentive programs, contract choices varied with respect to the type of silvopastoral system, extra land-use requirements, payment levels and contract duration. In addition, contracts differed with regards to access by cattle to streams. Although the farmers did not show strong preferences for every contract attribute, the majority of farmers in the area showed interest in the proposed contracts. A latent class model identified three classes of respondents, based on their preferences for different contracts attributes or the "business as usual" option. The results suggest that farmland area, agricultural income, and landowners' perceptions of environmental problems provide a partial explanation for the heterogeneity observed in the choices for specific contracts. Participation might increase if contracts were targeted at specific groups of farmers, such as those identified through our latent class model. Offering flexible contracts with varying additional requirements within the same scheme, involving farmers from the start in payments for environmental services design, and combining payments for environmental services with integrated conservation and development projects may be a better way to convince more farmers to adopt silvopastoral systems.

  18. Farmers' Preferences for PES Contracts to Adopt Silvopastoral Systems in Southern Ecuador, Revealed Through a Choice Experiment

    Science.gov (United States)

    Raes, Leander; Speelman, Stijn; Aguirre, Nikolay

    2017-08-01

    This study investigates farmers' preferences to participate in payment contracts to adopt silvopastoral systems in Ecuador. A choice experiment was used to elicit preferences between different contract attributes, including differing payment amounts and land management requirements. The research was carried out in the buffer zone of Podocarpus National Park in Southern Ecuador, an area where most land is dedicated to cattle husbandry. A choice experiment was conducted to measure farmers' interest in different types of contracts. Based on existing incentive programs, contract choices varied with respect to the type of silvopastoral system, extra land-use requirements, payment levels and contract duration. In addition, contracts differed with regards to access by cattle to streams. Although the farmers did not show strong preferences for every contract attribute, the majority of farmers in the area showed interest in the proposed contracts. A latent class model identified three classes of respondents, based on their preferences for different contracts attributes or the "business as usual" option. The results suggest that farmland area, agricultural income, and landowners' perceptions of environmental problems provide a partial explanation for the heterogeneity observed in the choices for specific contracts. Participation might increase if contracts were targeted at specific groups of farmers, such as those identified through our latent class model. Offering flexible contracts with varying additional requirements within the same scheme, involving farmers from the start in payments for environmental services design, and combining payments for environmental services with integrated conservation and development projects may be a better way to convince more farmers to adopt silvopastoral systems.

  19. Dearfield Dream Project: Developing an Interdisciplinary Historical/Cultural Research Network

    Directory of Open Access Journals (Sweden)

    Robert Brunswig

    2013-08-01

    Full Text Available The Dearfield Dream Project is a collaborative research initiative to conduct historical, cultural, archaeological, and environmental studies on the early 20th Century African-American colony site of Dearfield, Colorado, USA. Because the breadth and significance of the Dearfield Project requires an interdisciplinary research team, a network of research collaborators has been assembled. This research network seeks to discover, preserve, and disseminate knowledge of the site and its surrounding farmsteads’ economic, social, political, and environmental history for better understanding and interpretation of its contributions to Colorado and U.S. history. Herein, we detail progress that has been made on this important historical/cultural research project. Further, we outline the future of the Dearfield research network along with our current and anticipated subjects of inquiry.

  20. Good Faith in European Contract Law

    NARCIS (Netherlands)

    Hondius, E.H.

    2002-01-01

    Reinhard Zimmermann and Simon Whittaker, Good Faith in European Contract Law, pp 720, ISBN 0 521 77190 0, Cambridge University Press, Cambridge 2000. This is the first publication resulting from the Trento Common Core of European Private Law project. It analyses the law relating to good faith in

  1. 48 CFR 916.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ..., output, be it hardware, research and development, demonstration or services, together with business... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405-2 Cost-plus-award-fee... appropriate) and business management considerations tailored to the needs of the particular situation. In...

  2. Interdisciplinary physics research in the Japanese Hadron Project

    International Nuclear Information System (INIS)

    Yamazaki, Toshimitsu.

    1990-09-01

    The Japanese Hadron Project (JHP) is a large future plan of interdisciplinary and international scope, aimed at basic physics research by creating and using various secondary unstable particle beams such as mesons, muons, neutrons and accelerated exotic nuclei. It comprises a high-intensity proton linac of 1 GeV, a compressor/stretcher ring and an ISOL/accelerator to deliver beams to MESON, NEUTRON and EXOTIC NUCLEI arena's. In addition, as the present ongoing project, we are pushing KAON arena based on the KEK 12 GeV proton synchrotron. The present paper describes the scientific motivation and technological bases for this future project as well as the presently going pre-JHP research activities. (author)

  3. Development of project management data calculation models relating to dismantling of nuclear facilities. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Sukegawa, Takenori; Ohshima, Soichiro; Shiraishi, Kunio; Yanagihara, Satoshi [Department of Decommissioning and Waste Management, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai Ibaraki (Japan)

    1999-02-01

    Labor-hours necessary for dismantling activities are generally estimated based on experience, for example, as a form of unit productivity factors such as the relationship between labor-hours and weight of components dismantled which were obtained by actual dismantling activities. The project management data calculation models together with unit productivity factors for basic dismantling work activities were developed by analyzing the data obtained from the Japan Power Demonstration Reactor (JPDR) dismantling project, which will be applicable to estimation of labor-hours in various dismantling conditions. Typical work breakdown structures were also prepared by categorizing repeatable basic dismantling work activities for effective planning of dismantling activities. The labor-hours for dismantling the JPDR components and structures were calculated by using the code system for management of reactor decommissioning (COSMARD), in which the work breakdown structures and the calculation models were contained. It was confirmed that the labor-hours could be easily estimated by COSMARD through the calculations. This report describes the labor-hour calculation models and application of these models to COSMARD. (author)

  4. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  5. CURRENT STATUS OF RESEARCH PROJECT ACTIVITIES IN MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: In Bulgaria there are five medical universities: in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. Their main mission is training specialists in the fields of medicine and health care, increasing their qualification by means of postgraduate education and performing research activities. One of medical universities’ top priorities is encouraging research activities mainly aimed at preparation and implementation of research projects. Aim: The purpose of our study is to examine the current status of research project activities in Bulgarian medical universities.Material and methods: In order to define the science competitions related to Bulgarian medical universities we have applied a documentary and sociological approach. Results: Research projects that Bulgarian medical universities can apply for are divided into two groups – national and international. The most significant international projects are European ones since Bulgaria is an EU member state and this allows us to participate in such projects. Conclusion: Universities should strive for establishing even better conditions for encouraging application for research projects aimed at developing competent and experienced staff, even though the majority of them may not obtain approval for financing.The changes in the situation regarding Bulgarian science require the implementation and development of more research staff motivated to improve their knowledge and skills in the relevant dynamically changing competition and project field.

  6. Creative and Arts-Based Research Methods in Academic Research. Lessons from a Participatory Research Project in the Netherlands

    Directory of Open Access Journals (Sweden)

    Gwenda van der Vaart

    2018-05-01

    Full Text Available This article contributes to the discussion on the value of creative and arts-based research methods to researchers interested in community resilience. Based on a participatory research project that used a mix of these methods conducted in a Dutch village, we provide more nuanced, concrete insights into their value. We elaborate on the three project stages: walking interviews, group discussions, and a creative workshop that resulted in an exhibition, and on the challenges encountered during our project. We discuss how each project stage contributed to producing multifaceted knowledge. Researchers can benefit from the discussions about the process and implications of creative and arts-based methods such as ours as, to date, there has been relatively little methodological reflection on these methods. Based on our study, we conclude that despite some challenges, creative and arts-based research methods have much to offer researchers interested in community resilience. We found they can: 1. generate deep insight by going beyond rational-cognitive ways of knowing and providing new ways of understanding people's real lived experiences and views; and 2. offer ways to "give back" and contribute to a community, potentially igniting a spark among community members to engage in further action and contribute to their community's resilience. This aligns with the, currently often articulated, aims of researchers to directly benefit those involved and to share their research findings with a broader non-academic audience.

  7. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  8. Research of the tasks on risk communication enforcement (Contract research)

    International Nuclear Information System (INIS)

    Tanaka, Masaru; Aoyama, Isao; Ishizaka, Kaoru; Ohata, Yuki; Fukuike, Iori; Miyagawa, Hiroshi; Ishimori, Yuu

    2017-01-01

    From 1955 to 2001, Japan Atomic Energy Agency (JAEA) carried out research and development projects related to uranium exploration, mining, refining, conversion and enrichment at/around Ningyo-toge in Japan. Subsequently, JAEA has been carrying out remediation of the uranium mine legacy sites and decommissioning of the nuclear fuel cycle facilities. JAEA has many experiences of communication with local stakeholders from these projects. Among such experiences, management of the waste rock sites became local concern in 1988, 27 years after completion of the exploration. The issue was resolved in 2012 after several efforts. From this experience, it was suggested that the lack of information sharing with local stakeholders and that the inadequate support to stakeholder's requests caused the delay of problem solving. Therefore, sustainable relationship with local stakeholders for over decades is important for JAEA Ningyo-toge Environmental Engineering Center. As reference, similar domestic cases were investigated and strategies for risk communication were planned. As follows; (1) Clarify roles and responsibilities of communication staffs for sustainable communicating with local residents. (2) Identify gaps in risk communication knowledge among center and local residents and work toward filling those gaps. (3) Improve the effectiveness of Ningyo-toge center's website and PR-magazines as primary mechanism for communicating with wide stakeholders. (4) Investigate new communication methods for sustainable communicating, such as combination of environmental restoration studies by experts and environmental learning activities by residents. (author)

  9. Current status and future plan of the research on the rock deformation and disturbed zone within the Hades project

    International Nuclear Information System (INIS)

    Neerdael, Bernard; Bruyn, D.de; Volckaert, Geert

    1994-01-01

    In the framework of the high activity disposal experimental site (HADES) project managed by the Belgian Nuclear Research Establishment, an in situ research program was launched in 1980. An underground research facility was built in a deep Tertiary clay formation. The various issues related to the site characterization were investigated, including the performance of engineered barriers. Most of the research has been performed under the contract with the Commission of European Communities (CEC) and the Belgian Waste Management Authority (ONDRF/NIRAS). Various civil engineering works and underground experiments haave been carried out to assess the technical feasibility of building a high level waste repository in a plastic clay formaiton. Further information has been collected on the extent and the evolution of the disturbance caused in clay mass by underground structures. The study on clay behavior was extended to the near field conditions after disposal when the host rocks underwent the thermal effect of heat-emitting waste. The general background of the Boom clay, the mechanical behavior of the Boom clay, the numerical simulation of excavation progress and backfill materials are reported. (K.I.)

  10. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  11. University-Level Research Projects for High School Students

    Science.gov (United States)

    McConnell, Mark L.

    2000-01-01

    The goal of this project was to provide an opportunity for high school students to participate in university-level research projects. In this case, students from Pinkerton Academy (Derry, New Hampshire) were invited to participate in efforts to catalog data from the COMPTEL experiment on NASA's Compton Gamma-Ray Observatory (CGRO). These activities were part of a senior level honors course at Pinkerton. Although the success of this particular program was rather limited, we feel that the general concept is a sound one. In principle, the concept of partnerships between local schools and university researchers is one that could be especially attractive to soft money researchers. Programs can be carefully designed to benefit both the students and the research program.

  12. Auditability In The U.S. Navy: A Knowledge Assessment Of The Contracting Workforce

    Science.gov (United States)

    2016-12-01

    contracts, purchasing, management , marketing , quantitative methods or organization and management , a Baccalaureate degree, and one year of contracting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...maximum 200 words) The Department of Defense (DOD) has some problems in its contracting workforce that make the department susceptible to

  13. Global LNG - characteristics, clients and contracts

    International Nuclear Information System (INIS)

    Bauquis, P.R.

    1997-01-01

    Total's liquefied natural gas (LNG) holdings were described. Other topics discussed included an overview of gas consumption and internationally traded gas in 1995, a primer on the history of LNG, Japan's average import prices in 1996, Europe's border gas prices and consumption in 1995, Canada/US regional price differences in 1995 and 1996, and world gas markets and prices in 1996. The projected LNG supply and demand in Europe and Asia , especially in Japan, China and India, was also discussed. General concepts of LNG pricing, the general structure of a gas sales contract, and the different categories of LNG contracts were also reviewed. 24 figs

  14. Radioactive waste inventories and projections

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from January 1981 through September 1982. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. (25 abstracts)

  15. Research capacity building integrated into PHIT projects: leveraging research and research funding to build national capacity.

    Science.gov (United States)

    Hedt-Gauthier, Bethany L; Chilengi, Roma; Jackson, Elizabeth; Michel, Cathy; Napua, Manuel; Odhiambo, Jackline; Bawah, Ayaga

    2017-12-21

    Inadequate research capacity impedes the development of evidence-based health programming in sub-Saharan Africa. However, funding for research capacity building (RCB) is often insufficient and restricted, limiting institutions' ability to address current RCB needs. The Doris Duke Charitable Foundation's African Health Initiative (AHI) funded Population Health Implementation and Training (PHIT) partnership projects in five African countries (Ghana, Mozambique, Rwanda, Tanzania and Zambia) to implement health systems strengthening initiatives inclusive of RCB. Using Cooke's framework for RCB, RCB activity leaders from each country reported on RCB priorities, activities, program metrics, ongoing challenges and solutions. These were synthesized by the authorship team, identifying common challenges and lessons learned. For most countries, each of the RCB domains from Cooke's framework was a high priority. In about half of the countries, domain specific activities happened prior to PHIT. During PHIT, specific RCB activities varied across countries. However, all five countries used AHI funding to improve research administrative support and infrastructure, implement research trainings and support mentorship activities and research dissemination. While outcomes data were not systematically collected, countries reported holding 54 research trainings, forming 56 mentor-mentee relationships, training 201 individuals and awarding 22 PhD and Masters-level scholarships. Over the 5 years, 116 manuscripts were developed. Of the 59 manuscripts published in peer-reviewed journals, 29 had national first authors and 18 had national senior authors. Trainees participated in 99 conferences and projects held 37 forums with policy makers to facilitate research translation into policy. All five PHIT projects strongly reported an increase in RCB activities and commended the Doris Duke Charitable Foundation for prioritizing RCB, funding RCB at adequate levels and time frames and for allowing

  16. Laboratory technology research - abstracts of FY 1997 projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The Laboratory Technology Research (LTR) program supports high-risk, multidisciplinary research partnerships to investigate challenging scientific problems whose solutions have promising commercial potential. These partnerships capitalize on two great strengths of this country: the world-class basic research capability of the DOE Energy Research (ER) multi-program national laboratories and the unparalleled entrepreneurial spirit of American industry. A distinguishing feature of the ER multi-program national laboratories is their ability to integrate broad areas of science and engineering in support of national research and development goals. The LTR program leverages this strength for the Nation`s benefit by fostering partnerships with US industry. The partners jointly bring technology research to a point where industry or the Department`s technology development programs can pursue final development and commercialization. Projects supported by the LTR program are conducted by the five ER multi-program laboratories. These projects explore the applications of basic research advances relevant to DOE`s mission over a full range of scientific disciplines. The program presently emphasizes three critical areas of mission-related research: advanced materials; intelligent processing/manufacturing research; and sustainable environments.

  17. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  18. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  19. The JAERI and Universities joint project research reports on the 4th joint research project between JAERI and Universities on backend chemistry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-02-01

    In the Joint Research Project between JAERI and Universities on Backend Chemistry, the 4th-term researches of it were performed on sixteen themes from April of 1999 to March of 2001 under the four categories, i.e. Nuclear-chemistry and physical-chemistry properties of actinides', 'Solid state chemistry and nuclear fuel engineering of actinides', 'Solution chemistry and technologies for separation and analysis of actinides' and Treatment of radioactive waste and environmental chemistry'. The present report compiled the papers contributed to the Joint Research Project. (author)

  20. Psychological Contract Development: An Integration of Existing Knowledge to Form a Temporal Model

    Directory of Open Access Journals (Sweden)

    Kelly Windle

    2014-07-01

    Full Text Available The psychological contract has received substantial theoretical attention over the past two decades as a popular framework within which to examine contemporary employment relationships. Previous research mostly examines breach and violation of the psychological contract and its impact on employee organization outcomes. Few studies have employed longitudinal, prospective research designs to investigate the psychological contract and as a result, psychological contract content and formation are incompletely understood. It is argued that employment relationships may be better proactively managed with greater understanding of formation and changes in the psychological contract. We examine existing psychological contract literature to identify five key factors proposed to contribute to the formation of psychological contracts. We extend the current research by integrating these factors for the first time into a temporal model of psychological contract development.

  1. Harvard Personal Genome Project: lessons from participatory public research

    Science.gov (United States)

    2014-01-01

    Background Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an ‘open consent’ framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Discussion Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. Summary We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants. PMID:24713084

  2. Harvard Personal Genome Project: lessons from participatory public research.

    Science.gov (United States)

    Ball, Madeleine P; Bobe, Jason R; Chou, Michael F; Clegg, Tom; Estep, Preston W; Lunshof, Jeantine E; Vandewege, Ward; Zaranek, Alexander; Church, George M

    2014-02-28

    Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an 'open consent' framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants.

  3. Toolbox for Research, or how to facilitate a central data management in small-scale research projects.

    Science.gov (United States)

    Bialke, Martin; Rau, Henriette; Thamm, Oliver C; Schuldt, Ronny; Penndorf, Peter; Blumentritt, Arne; Gött, Robert; Piegsa, Jens; Bahls, Thomas; Hoffmann, Wolfgang

    2018-01-25

    In most research projects budget, staff and IT infrastructures are limiting resources. Especially for small-scale registries and cohort studies professional IT support and commercial electronic data capture systems are too expensive. Consequently, these projects use simple local approaches (e.g. Excel) for data capture instead of a central data management including web-based data capture and proper research databases. This leads to manual processes to merge, analyze and, if possible, pseudonymize research data of different study sites. To support multi-site data capture, storage and analyses in small-scall research projects, corresponding requirements were analyzed within the MOSAIC project. Based on the identified requirements, the Toolbox for Research was developed as a flexible software solution for various research scenarios. Additionally, the Toolbox facilitates data integration of research data as well as metadata by performing necessary procedures automatically. Also, Toolbox modules allow the integration of device data. Moreover, separation of personally identifiable information and medical data by using only pseudonyms for storing medical data ensures the compliance to data protection regulations. This pseudonymized data can then be exported in SPSS format in order to enable scientists to prepare reports and analyses. The Toolbox for Research was successfully piloted in the German Burn Registry in 2016 facilitating the documentation of 4350 burn cases at 54 study sites. The Toolbox for Research can be downloaded free of charge from the project website and automatically installed due to the use of Docker technology.

  4. Report on research and development work 1985 on the nuclear fusion project. Annual report of the Association KfK-Euratom

    International Nuclear Information System (INIS)

    Finken, D.

    1986-05-01

    The Nuclear Research Centre Karlsruhe and the Max Planck Institute for Plasma Physics together form the Nuclear Fusion Development Association. The partners collaborate with the aim of creating the physical and technical preconditions for the use of the energy released by nuclear fusion and to plan and carry out future large-scale experiments. The work of the Nuclear Research Centre Karlsruhe on fusion with magnetic containment is included in the nuclear fusion project and is part of the European fusion technology programme. The work is supported by an association contract between KfK and Euratom by the European Commission. Connections are built up between areas of work and new projects are prepared by supplementary KfK contributions, mostly studies. This is done with regard to the expansion of the technology programme to be expected for future years and the planning activities for NET. The reports collected here are contributions of the KfK institutes in 1985. The appendix contains a list of the tasks which KfK has taken over from the fusion technology programme of the EEC. References to the institutes' contributions make the assignment of textual contributions easier. (orig.) [de

  5. Performance-Driven Interface Contract Enforcement for Scientific Components

    Energy Technology Data Exchange (ETDEWEB)

    Dahlgren, Tamara Lynn [Univ. of California, Davis, CA (United States)

    2008-01-01

    Performance-driven interface contract enforcement research aims to improve the quality of programs built from plug-and-play scientific components. Interface contracts make the obligations on the caller and all implementations of the specified methods explicit. Runtime contract enforcement is a well-known technique for enhancing testing and debugging. However, checking all of the associated constraints during deployment is generally considered too costly from a performance stand point. Previous solutions enforced subsets of constraints without explicit consideration of their performance implications. Hence, this research measures the impacts of different interface contract sampling strategies and compares results with new techniques driven by execution time estimates. Results from three studies indicate automatically adjusting the level of checking based on performance constraints improves the likelihood of detecting contract violations under certain circumstances. Specifically, performance-driven enforcement is better suited to programs exercising constraints whose costs are at most moderately expensive relative to normal program execution.

  6. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  7. The role of research programs and commercial contracts for increase of economic competitiveness and development at INR Pitesti

    International Nuclear Information System (INIS)

    Petra, Nicoleta Mihaela; Ionila, Maria; Datcu, Mirela; Balan, Iosif Bogdan; Cretu, Ileana

    2008-01-01

    In the period in which globalization is increasing, one of the strategic objectives of the institute is to focus on those activities which help developing of services, products and technologies, applicable in nuclear industry, environment protection and medicine. One way to sustain INR activity is the technological transfer which ensures availability of research results by carrying out of R and D contracts in priority areas and of contracts with economical agents for the supply of services, products, technologies, such as: - Materials irradiation for medicine, industry and research; - Neutron Activation Analysis (NAA) and prompt gamma spectrometry for Cernavoda NPP - Unit 1; - Control and testing: non-destructive examination, functional tests of samples and equipment from Cernavoda NPP - Unit 1; - Characterization, conditioning and treatment of radioactive wastes for NPP- Cernavoda, Unit 1, Nuclear Fuel Plant (FCN) - Pitesti; - Measurement of isotopes concentration in environmental samples; -Corrosion experiments in static autoclaves and experiments regarding microbial corrosion for NPP Cernavoda Unit 1 and FCN Pitesti; - Nuclear consultancy for Cernavoda NPP - Unit 1 and Unit 2; - Stainless steel casks for radwaste; - Containers for heavy water; - Training and practice for students at the Universities of Pitesti, Bucuresti, Brasov. The paper presents the main areas where the results obtained in R and D programs can be applied, their implementation can be done, and the status of contracts and their importance for INR Pitesti and Romanian society development, as well. (authors)

  8. Are Project Developers Knights and Researchers Queens?

    DEFF Research Database (Denmark)

    Vinstrup, Anya Bjørn

    2014-01-01

    How do project developers at universities view their customers – the researchers, and how do they see themselves as a profession? Does this view influence their motivation and what challenges does it impose? Taking elements of theory from Public Service Motivation (PSM) and linking it with a small...... empirically based survey among the project developers at a centrally located office at a university in Denmark – these questions are sought to be answered. The focal point being the motivation of the project developer, with special emphasis on their user perception, and the practical implications it has...... for leadership and organisational structures....

  9. Future Contract Selection by Term Structure Analysis

    Directory of Open Access Journals (Sweden)

    Vasco Grossmann

    2017-07-01

    Full Text Available In futures markets, a single asset is generally represented by several contracts with different maturities. The selection of specific contracts is an inevitable task that also creates new opportunities, especially in terms of speculative trading. Evaluating immediate and upcoming trading costs for all considered contracts might lead to a significantly improved performance. Among that, even possible market inefficiencies might be taken into consideration. This research introduces and evaluates a new algorithm for the contract selection. The results are benchmarked and compared with established methods using a Monte Carlo simulation on different commodity and index futures.

  10. Learning Contracts in Undergraduate Courses: Impacts on Student Behaviors and Academic Performance

    Science.gov (United States)

    Frank, Timothy; Scharf, Lauren F. V

    2013-01-01

    This project studied the effect of individualized, voluntary learning contracts for 18 students who performed poorly in the first part of the semester. Contracts were hypothesized to increase commitment and motivation, and lead to changes in behaviors and course performance. Self-reported prioritization and learning-related behaviors (completion…

  11. Korea-China optical technology research centre project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Cheol Jung; Lee, J M; Rhee, Y J. and others

    2001-09-01

    The main objectives of this project are to establish the internatinal collaboration basis of optical technolgies between Korean and China through the combination of the Chinese advanced fundamental technologies with the Korea industrialization and commercialization infrastructures, by ways of exchanging scientist and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to that of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both of the countries, technical support for the investment on the optical industries in the two countries and establishment of foundation for the venture capitals are also the purpose of this project. Because the state-of-the-arts of the Chinese technologies such as aerospace engineering, military defense technology, applications to medical treatments, laser fusion research, and so on, are known to be far above those of Korean and upto one of the most advanced in the world, it is necessary that the acquisition of these technologies, resulting in the enhancement of the levels of domestic technologies in these fields, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued.

  12. Korea-China Optical Technology Research Centre Project

    International Nuclear Information System (INIS)

    Kim, Cheol Jung; Rhee, Y. J.; Jung, D. Y. and others

    2004-06-01

    The main objectives of this project are to establish the international collaboration basis of optical technologies between Korea and China. The combination of the Chinese advanced fundamental technologies with the Korean industrialization and commercialization infrastructures is realized, by ways of exchanging scientists and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to those of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both countries, providing technical advice and suggestions to the optical industries in the two countries is an another goal of this project. The state-of-the-arts of the Chinese technologies such as aerospace engineering, military defence technology, medical technology, laser fusion research, and so on, are known to be far above those of Korean and up to one of the most advanced in the world. Thus it is thought to be necessary that the acquisition of these technologies, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued in order to enhance the levels of Korean technologies in these fields

  13. Korea-China optical technology research centre project

    International Nuclear Information System (INIS)

    Kim, Cheol Jung; Lee, J. M.; Rhee, Y. J. and others

    2001-09-01

    The main objectives of this project are to establish the internatinal collaboration basis of optical technolgies between Korean and China through the combination of the Chinese advanced fundamental technologies with the Korea industrialization and commercialization infrastructures, by ways of exchanging scientist and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to that of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both of the countries, technical support for the investment on the optical industries in the two countries and establishment of foundation for the venture capitals are also the purpose of this project. Because the state-of-the-arts of the Chinese technologies such as aerospace engineering, military defense technology, applications to medical treatments, laser fusion research, and so on, are known to be far above those of Korean and upto one of the most advanced in the world, it is necessary that the acquisition of these technologies, resulting in the enhancement of the levels of domestic technologies in these fields, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued

  14. Korea-China Optical Technology Research Centre Project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Cheol Jung; Rhee, Y. J.; Jung, D. Y. and others

    2004-06-15

    The main objectives of this project are to establish the international collaboration basis of optical technologies between Korea and China. The combination of the Chinese advanced fundamental technologies with the Korean industrialization and commercialization infrastructures is realized, by ways of exchanging scientists and informations, holding joint seminars, cooperative utilization of research resources. On the ground of this establishment, the optical technologies of Korea are supposed to be leveled up to those of the world-most advanced. At the same time, for the improvement of mutual benefit and financial profit of both countries, providing technical advice and suggestions to the optical industries in the two countries is an another goal of this project. The state-of-the-arts of the Chinese technologies such as aerospace engineering, military defence technology, medical technology, laser fusion research, and so on, are known to be far above those of Korean and up to one of the most advanced in the world. Thus it is thought to be necessary that the acquisition of these technologies, implementation of joint research projects for technology development as well as the balanced opportunities for commercial product/sales and cooperation should be actively pursued in order to enhance the levels of Korean technologies in these fields.

  15. Reading Research Utilization Project: An RIC Project for Teachers and Other Field Personnel.

    Science.gov (United States)

    District of Columbia Public Schools, Washington, DC. Dept. of Research and Evaluation.

    This is the final report of the Reading Research Utilization Project (RUP) which was funded by the U.S. Office of Education from July, 1971 to June, 1973. The purpose of the RUP was to encourage the translation of research, particularly reading research, into practice in 16 target elementary schools in Washington, D.C. RUP was a school information…

  16. Research projects and capacity building | Breen | Water SA

    African Journals Online (AJOL)

    ... by capacity building in the context of research projects. Based on this interpretation, reasonable and unreasonable expectations with respect to the extent to which capacity building can be achieved within a given project duration are discussed. A model is suggested, which would improve understanding and delivery and ...

  17. Regulatory body core competencies: when should a regulator contract a TSO?

    International Nuclear Information System (INIS)

    Wieland, Patricia; Salati de Almeida, Ivan P.; Almeida, Claudio U.; Costa, Eduardo M.

    2008-01-01

    The main nuclear regulatory functions are authorization, safety review and assessment, inspection and enforcement and development of regulations and guides. Additionally, the following supplementary functions may be executed by the regulatory body: research and development, emergency response and international cooperation. In order to function properly, the regulatory body should also have the following support functions: general management, logistics, training, communication and information, information technology support, institutional relationship, internal controls and audits, ombudsman and legal support. Technical Support Organizations (TSOs) may assist the regulatory body in meeting the challenges in a rapid growing and changing environment. Specially when there is a temporary need for a wider technical expertise diversity, short time to finish a project or when the cost of developing and maintaining infrastructure of their own laboratories for analysis and research is too high and may deviate the focus on the regulator's mission. Decision on the 'size' of the regulatory body and on what can be contracted to a Technical Support Organization (TSO) depends on the resources and capabilities needed to fulfil the regulatory functions efficiently. It is important to establish the core competencies that must be at the regulatory body, keeping the focus on the regulatory goals and define the real need to contract a TSO, weighting the benefits and disadvantages. As a contribution to the definition of the regulatory core competencies, the paper discusses what is essential to be kept at the regulatory body and what can be delegated to a TSO; how to manage and control the work of the TSO; the cost effectiveness of contracting, sharing of tacit knowledge; how to handle eventual conflicts between the parties involved in the licensing process; contract types and risk evaluation, concerning the dependence on a TSO, eventual change of partners and the intellectual capital

  18. Expanding Energy Performance Contracting in china: policy solutions and market mechanisms

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Bo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Price, Lynn [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Liu, Xu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Meng, Lu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Shi, Wenjing [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Evans, Meredydd [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Roshchanka, Volha [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Yu, Sha [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-07-19

    Energy performance contracting is an important market mechanism that uses energy savings to pay over time for the upfront costs of energy efficiency retrofits in buildings, industries, and other types of facilities. Through energy performance contracts (EPCs), Energy Service Companies (ESCOs) play an important role in implementing energy efficiency retrofits. Both China and the United States have large markets for EPCs and significant opportunities for growth. The Chinese government has made great efforts in promoting the country’s ESCO business and expanding its EPC markets. This paper makes a series of recommendations for China to adopt more ambitious policy measures to encourage deep energy savings projects via EPCs. These recommendations are built on initial insights from a white paper developed by researchers at the Pacific Northwest National Laboratory and the Lawrence Berkeley National Laboratory with the assistance from the ESCO Committee of China’s Energy Conservation Association (EMCA). Key recommendations are listed below.

  19. Latent organizations in the film industry: contracts, rewards and resources

    NARCIS (Netherlands)

    Ebbers, J.J.; Wijnberg, N.M.

    2009-01-01

    The main aim of this article is to study the extent to which the project-based organization (PBO) and the latent organization determine the actual behavior of actors in a project-based industry and how this is mediated by the types of contracts and rewarding practices these organizational forms

  20. Crowd-sourced Archaeological Research: The MicroPasts Project

    Directory of Open Access Journals (Sweden)

    Chiara Bonacchi

    2014-10-01

    Full Text Available This paper offers a brief introduction to MicroPasts, a web-enabled crowd-sourcing and crowd-funding project whose overall goal is to promote the collection and use of high quality research data via institutional and community collaborations, both on- and off-line. In addition to introducing this initiative, the discussion below is a reflection of its lead author’s core contribution to the project and will dwell in more detail on one particular aspect of MicroPasts: its relevance to research and practice in public archaeology, cultural policy and heritage studies.

  1. On-going research projects at Ankara Nuclear research center in agriculture and animal science

    International Nuclear Information System (INIS)

    Tukenmez, I.

    2004-01-01

    Full text:The research and development activities of Ankara Nuclear Research Center in Agriculture and Animal Science(ANRCAA) are concentrated on the contribution of atomic energy to peace by the use of nuclear and related techniques in food, agriculture and animal science. Nuclear techniques are used in the above fields in two ways: in vitro or in vivo radio tracing the substances and processes of biological importance, and irradiation of biological materials for preservation and quality modification. Research projects are carried out by interdisciplinary studies with well equipped laboratories at the Center. The projects in progress conducted by the Center comprises nuclear-aided researches in soil fertility, plant nutrition, plant protection, improvement of field crops, improvement of horticultural plants and forest trees by mutation breeding, in vitro culture technique with mutagen treatments, use of phosphogypsum in soil amelioration, sterilization of medical supplies, wastewater treatment, animal nutrition, animal health and productivity and accreditation. The on-going projects with the above subjects will be summarized for possible collaborations

  2. On-going research projects at Ankara Nuclear Research Center in Agriculture and Animal Science

    International Nuclear Information System (INIS)

    Tukenmez, I.

    2004-01-01

    Full text: The research and development activities of Ankara Nuclear Research Center in Agriculture and Animal Science(ANRCAA) are concentrated on the contribution of atomic energy to peace by the use of nuclear and related techniques in food, agriculture and animal science. Nuclear techniques are used in the above fields in two ways: in vitro or in vivo radio tracing the substances and processes of biological importance, and irradiation of biological materials for preservation and quality modification. Research projects are carried out by interdisciplinary studies with well equipped laboratories at the Center. The projects in progress conducted by the Center comprises nuclear-aided researches in soil fertility, plant nutrition, plant protection, improvement of field crops, improvement of horticultural plants and forest trees by mutation breeding, in vitro culture technique with mutagen treatments, use of phosphogypsum in soil amelioration, sterilization of medical supplies, wastewater treatment, animal nutrition, animal health and productivity and accreditation. The on-going projects with the above subjects will be summarized for possible collaborations

  3. MIV Project: Executive Summary

    DEFF Research Database (Denmark)

    Ravazzotti, Mariolina T.; Jørgensen, John Leif; Neefs, Marc

    1997-01-01

    Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing the feasibility of Rendez-vous and docking of unmanned spacecrafts, a reference mission scenario was defined. This report gives an executive summary of the achievements and results from the project.......Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing the feasibility of Rendez-vous and docking of unmanned spacecrafts, a reference mission scenario was defined. This report gives an executive summary of the achievements and results from the project....

  4. INVESTIGATING WHAT ROMANIAN IT RECRUITERS AND EMPLOYEES VALUE WHEN THEY NEGOTIATE EMPLOYMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Anca Maria CLIPA

    2017-12-01

    Full Text Available When negotiating, people have economic as well noneconomic, subjective concerns. This study is an exploratory investigation into the objective and subjective factors influencing employment contract negotiations and the willingness to interact in future business negotiations in the case of Romanian IT employees and recruiters. The study draws on qualitative data collection and analysis methods, i.e. semi-structured interviews with 10 participants, projective techniques and content analysis. At the time, 5 of the participants held recruitment and contracting HR roles, and 5 were working as employees (programmers, business analysts, IT project managers. They all had a recent working contract negotiation experience (less than one year ago in the IT industry. Using the principles of corpus linguistics and the methods specific to discourse and critical discourse analysis, our study highlights some of the factors taken into account by Romanian IT employees and recruiters in employment contract negotiations.

  5. Ferox is awarded another contract by CERN

    CERN Multimedia

    2002-01-01

    Ferox, manufacturer of equipment for the chemical industry, has been awarded a second contract by the physical research centre CERN (Switzerland). The contract regards the delivery of 10 pcs of stainless containers for liquid nitrogen and argon with a capacity of 50 cu mt (1 paragraph).

  6. CARONTE project: Creating an Agenda for Research on Transportation Security

    Energy Technology Data Exchange (ETDEWEB)

    Leon Bello, J.; Gonzalez Viosca, E.

    2016-07-01

    Europe’s prosperity relies on effective transport systems. Any attacks and disturbances to land freight and passenger transport would have significant impact on economic growth, territorial cohesion, social development and the environment. Unfortunately, there are weaknesses in the land transport security.The objective of CARONTE project is define a future research agenda for security in land transport that focuses on core gaps caused by emerging risks while avoiding any doubling-up of research elsewhere. Its research agenda will cover all threats, including cyber-crime, and security aspects across all modes of land transportation. At the same time, it will respect the fundamental human rights and privacy of European citizens. The step-by-step method of CARONTE’s consortium has analyzed the state of the art and emerging risks; has identified gaps, analyses and assessments of potential solutions; and has produced an overall research agenda for the future. CARONTE’s results will answer the following questions among others: Which existing research projects merit a follow up and extension? Where are the combinations or synergy effects to be attended? Which themes and topics should be elaborated in new research projects? Who should be involved and integrated in future research projects (stakeholders, authorities, etc.)? The CARONTE consortium includes universities and research institutes, companies, and end-users providing with experience in research and consultancy in transportation, logistics, infrastructure management, security and communications. ITENE - Instituto Tecnológico del Embalaje, Transporte y Logística-has been one of the Project partners among a total of 11 members from eight different countries in the European Union which have also been supported via a High Level Advisory Board. (Author)

  7. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  8. Water Resources Research Grant Program project descriptions, fiscal year 1987

    Science.gov (United States)

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  9. European research project 'Metrology for radioactive waste management'

    International Nuclear Information System (INIS)

    Suran, J.

    2014-01-01

    The three-year European research project M etrology for Radioactive Waste Management' was launched in October 2011 under the EMRP (European Metrology Research Programme). It involves 13 European national metrology institutes and a total budget exceeds four million Euros. The project is coordinated by the Czech Metrology Institute and is divided into five working groups. This poster presents impact, excellence, relevance to EMPR objectives, and implementation and management of this project.(author)

  10. Lessons learned from setting up the NOWESP research data base: Experiences in an interdisciplinary research project

    Science.gov (United States)

    Radach, Günther; Gekeler, Jens

    1996-09-01

    Research carried out within the framework of the MAST project NOWESP (North-West European Shelf Programme) was based on a multi-parameter data set of existing marine data, relevant for estimating trends, variability and fluxes on the Northwest European Shelf. The data sets were provided by the partners of the project. Additional data sets were obtained from several other institutions. During the project, the data were organized in the NOWESP Research Data Base (NRDB), for which a special data base scheme was defined that was capable of storing different types of marine data. Data products, like time series and interpolated fields, were provided to the partners for analysis (Radach et al. [1997]). After three years of project time, the feasibility of such an approach is discussed. Ways of optimizing data access and evaluation are proposed. A project-oriented Research Data Base is a useful tool because of its flexibility and proximity to the research being carried out. However, several requirements must be met to derive optimum benefits from this type of service unit. Since this task usually is carried out by a limited number of staff, an early start of project data management is recommended. To enable future projects to succeed in an analogous compilation of relevant data for their use, as performed in NOWESP, the task of organizing the data sets for any short-term project should be shared between a research data base group and a national or international data centre whose experience and software could be used. It must be ensured that only quality controlled data sets from the individual data-produ cing projects are delivered to the national data centres. It is recommended that data quality control should be performed by the originators and/or data centres before delivering any data sets to the research data base. Delivery of the (full) data sets should be checked and their quality should be approved by authorized data centres.

  11. Fuel irradiation research of Japan at OECD Halden Reactor Project. Achievement of joint researches between JAERI and other organizations in the period from 1994 to 1996

    International Nuclear Information System (INIS)

    Uetsuka, Hiroshi; Nakamura, Jinichi; Kinoshita, Motoyasu

    1998-01-01

    JAERI has performed cooperative researches with many Japanese agencies and companies by means of the Halden Boiling Heavy Water Reactor (HBWR) which is located at Halden in Norway. These cooperative researches are carried out based on the contracts of the cooperative researches, which are revised every three years, in accordance with the renewal of the participation of JAERI to the OECD Halden Reactor Project. This report summaries the objectives, contents and the outlines of the achievements of the cooperative researches during the three years from 1994 January to 1996 December. During the period, ten cooperative researches had been carried out, and two of them had finished during the period and other eight researches has been continued to the next three year period. There are many research items, and most of them are irradiation test researches of advanced fuel and cladding concerned with the high burnup utilization of LWR fuel or MOX fuel irradiation researches to prepare for the introduction of Plutonium utilization in LWRs. The researches of fuel irradiation usually take long time because of the characteristics of these kind of research work, and three years are usually not enough to obtain some achievements from the irradiation tests. Therefore, eight tests have been continued after the three year period. In this report, the achievements of the continued researches to the next three year period are not final one but a kind of progress report. (author) kind of progress report. (author)

  12. Community-researcher liaisons: the Pathways to Resilience Project ...

    African Journals Online (AJOL)

    The Pathways to Resilience Project is an ongoing, community-based participatory research (CBPR) project. Its express focus is the exploration of how at-risk youths use formal services and/or informal, naturally occurring resources to beat the odds that have been stacked against them, with the intent of partnering with ...

  13. TRIGA Research Reactor Conversion to LEU and Modernization of Safety Related Systems

    Energy Technology Data Exchange (ETDEWEB)

    Sanda, R. M. [Institute for Nuclear Research Piteşti (SCN-Piteşti), Piteşti (Romania)

    2014-08-15

    The USA and IAEA proposed an international programme to reduce the enrichment of uranium in research reactors by converting nuclear fuel containing HEU into fuel containing 20% enriched uranium. The Government of Romania joined the programme and actively supported political, scientific, technical and economic actions that led to the conversion of the active area of the 14 MW TRIGA reactor at the Institute for Nuclear Research in Piteşti in May 2006. This confirmed the continuity of the Romanian Government’s non-proliferation policy and their active support of international cooperation. Conversion of the Piteşti research reactor was made possible by completion of milestones in the Research Agreement for Reactor Conversion, a contract signed with the US Department of Energy and Argonne National Laboratory. This agreement provided scientific and technical support and the possibility of delivery of all HEU TRIGA fuel to the United States. Additionally, about 65% of the fresh LEU fuel needed to start the conversion was delivered in the period 1992–1994. Furthermore, conversion was promoted through IAEA Technical Cooperation project ROM/4/024 project funded primarily by the United States that supported technical and scientific efforts and the delivery of the remaining required LEU nuclear fuel to complete the conversion. Nuclear fuel to complete the conversion was made by the French company CERCA with a tripartite contract among the IAEA, CERCA and Romania. The contract was funded by the US Department of Energy with a voluntary contribution by the Romanian Government. The contract stipulated manufacturing and delivery of LEU fuel by CERCA with compliance measures for quality, delivery schedule and safety requirements set by IAEA standards and Romanian legislation. The project was supported by the ongoing technical cooperation, safeguards, legal and procurement assistance of the IAEA, in particular its Department of Nuclear Safety. For Romanian research, the

  14. Online tutoring procedure for research project supervision: management, organization and key elements

    Directory of Open Access Journals (Sweden)

    Antònia Darder Mesquida

    2015-07-01

    Full Text Available Research project tutoring appears as a crucial element for teaching; it is a planned action based on the relationship between a tutor and a student. This paper presents the findings of a design and development research which has as its main aim to create an organization system for the tutoring of online research projects. That system seeks to facilitate the tutoring and supervision task with trainee researchers, providing guidance for its management and instruments for its implementation. The main conclusions arising from this research derive from considering the need to offer a solution to the problem of distance research project supervision and has materialized in organization and sequencing through a model about the variables that influence the research project tutoring problem.

  15. Designing Business and Technology Management Work-Packages in Cleantech Research Projects

    DEFF Research Database (Denmark)

    Tambo, Torben; Enevoldsen, Peter

    2014-01-01

    a clearer and more explicit perspective of conversion from research to business in to research project in energy storage. This paper suggests a model view on the conversion capability within cleantech research projects in order to anchor a distinctive and methodological consideration for business...

  16. Student and Faculty Outcomes of Undergraduate Science Research Projects by Geographically Dispersed Students

    Science.gov (United States)

    Shaw, Lawton; Kennepohl, Dietmar

    2013-01-01

    Senior undergraduate research projects are important components of most undergraduate science degrees. The delivery of such projects in a distance education format is challenging. Athabasca University (AU) science project courses allow distance education students to complete research project courses by working with research supervisors in their…

  17. Project management best practices: forging win-win partnerships

    International Nuclear Information System (INIS)

    Livet, B.

    2006-01-01

    This paper reviews various aspects of management of renewable energy projects. It outlines contracting strategies, major cost impacts on balance of plants construction and permitting a wind farm project. It concludes by recommending a careful evaluation of the contracting strategy which best fits the circumstances, consideration of site and balance of plant issues in developing a realistic cost model for the project and making an early contact with authorities to ascertain the permitting required for the project

  18. Research on evaluation of enterprise project culture based on Denison model

    Directory of Open Access Journals (Sweden)

    Yucheng Zeng

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to build enterprise project culture evaluation model and search for the best evaluation method for Chinese enterprise project culture on the basis of studying and drawing lessons from enterprise culture evaluation theory and method at home and abroad. Design/methodology/approach: Referring to the Denison enterprise culture evaluation model, this paper optimizes it according to the difference of enterprise project culture, designs the enterprise project culture evaluation model and proves the practicability of the model through empirical. Finding: This paper finds that it`s more applicable to use the Denison model for enterprise project culture evaluation through the comparative analysis of domestic and foreign enterprise culture evaluation theory and method, the systematic project culture management framework of Chinese enterprises has not yet formed through empirical research, and four factors in enterprise project culture have important influence on project operation performance improvement. Research limitations/implications: The research on evaluation of enterprise project culture based on Denison model is a preliminary attempt, the design of evaluation index system, evaluation model and scale structure also need to be improved, but the thinking of this paper in this field provides a valuable reference for future research. Practical Implications: This paper provides the support of theory and practice for evaluating the present situation of enterprise project culture construction and analyzing the advantages and disadvantages of project culture, which contributes to the "dialectical therapy" of enterprise project management, enterprise management and enterprise project culture construction. Originality/value: The main contribution of this paper is the introduction of Denison enterprise culture model. Combining with the actual situation of enterprises, this paper also builds the evaluation model for

  19. 48 CFR 227.7103-6 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... software or computer software documentation (see 227.72), commercial items (see 227.7102-3), existing works...-engineer and construction contracts. (b)(1) Use the clause at 252.227-7013 with its Alternate I in research... Software Previously Delivered to the Government, in solicitations when the resulting contract will require...

  20. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.