  1. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  2. The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

    Science.gov (United States)

    Suhaida, S. K.; Wong, Z. D.

    2017-11-01

    Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.

  3. 24 CFR 891.595 - HAP contract extension or renewal.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract extension or renewal... Handicapped-Section 8 Assistance § 891.595 HAP contract extension or renewal. Upon expiration of the term of the HAP contract, HUD and the Borrower may agree (subject to available funds) to extend the term of...

  4. Contraction-based classification of supersymmetric extensions of kinematical lie algebras

    International Nuclear Information System (INIS)

    Campoamor-Stursberg, R.; Rausch de Traubenberg, M.

    2010-01-01

    We study supersymmetric extensions of classical kinematical algebras from the point of view of contraction theory. It is shown that contracting the supersymmetric extension of the anti-de Sitter algebra leads to a hierarchy similar in structure to the classical Bacry-Levy-Leblond classification.

  5. 77 FR 38078 - Notice of Extension of Concession Contract

    Science.gov (United States)

    2012-06-26

    ... Extension of Concession Contract AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: Pursuant to the terms of the listed concession contract, the National Park Service hereby gives public notice... INFORMATION: The contract listed below will expire by its terms on October 31, 2013. Pursuant to 36 CFR 51.23...

  6. 75 FR 52013 - Notice of Extension of Concession Contract

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Extension of Concession Contract AGENCY: National Park Service, Interior. ACTION: Public notice. DATES: Effective Date: January 1, 2013. FOR FURTHER... contract for a period of two years through December 31, 2014. SUPPLEMENTARY INFORMATION: The listed...

  7. Incentive contracts for development projects

    Science.gov (United States)

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  8. 30 CFR 881.6 - Project contract.

    Science.gov (United States)

    2010-07-01

    ... contractors or suppliers for the construction, installation, services or work to be performed. (b) Project... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a...

  9. 77 FR 65169 - Extension of Certain Timber Sale Contracts; Finding of Substantial Overriding Public Interest

    Science.gov (United States)

    2012-10-25

    ... that are in breach, or (6) contracts when the purchaser's processing facility has not operated during... DEPARTMENT OF AGRICULTURE Forest Service Extension of Certain Timber Sale Contracts; Finding of Substantial Overriding Public Interest AGENCY: Forest Service, USDA. ACTION: Notice of contract extensions...

  10. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  11. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  12. Contract types for nuclear power projects, non-turnkey type contracts in particular

    International Nuclear Information System (INIS)

    Nyte'n, T.

    1975-01-01

    A non-turnkey contract differs from a turnkey contract in no special formal way. The way the buyer chooses to exercise his project leadership must be concretized in the contract. The way and extent he wishes to exercise technical checking must be laid down in the form of clear rules. The way information has to flow from one contractor over buyer to others and vice versa has to be laid down in detail and the consequences of non conformance fixed in such a manner that optimum project performance is reached. (orig./FW) [de

  13. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  14. 77 FR 9698 - Notice of Extension of Concession Contracts

    Science.gov (United States)

    2012-02-17

    ...-03 Dudley Food and Gulf Islands Beverage, Inc.. National Seashore. FOR FURTHER INFORMATION CONTACT... DEPARTMENT OF THE INTERIOR National Park Service Notice of Extension of Concession Contracts AGENCY: National Park Service, Interior. ACTION: Public notice. SUMMARY: The National Park Service hereby...

  15. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  16. 76 FR 2706 - Notice of Extension of Concession Contracts

    Science.gov (United States)

    2011-01-14

    ... Florida, Inc. GUIS001-03 Dudley Food and Gulf Islands National Seashore. Beverage. JODR002-90... DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE [NPS-WASO-CONC-0111-6327; 2410-OYC] Notice of Extension of Concession Contracts AGENCY: National Park Service, Interior. ACTION: Public notice. DATES...

  17. A simple extension of contraction theory to study incremental stability properties

    DEFF Research Database (Denmark)

    Jouffroy, Jerome

    Contraction theory is a recent tool enabling to study the stability of nonlinear systems trajectories with respect to one another, and therefore belongs to the class of incremental stability methods. In this paper, we extend the original definition of contraction theory to incorporate...... in an explicit manner the control input of the considered system. Such an extension, called universal contraction, is quite analogous in spirit to the well-known Input-to-State Stability (ISS). It serves as a simple formulation of incremental ISS, external stability, and detectability in a differential setting....... The hierarchical combination result of contraction theory is restated in this framework, and a differential small-gain theorem is derived from results already available in Lyapunov theory....

  18. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  19. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  20. A comparison of project participants and extension officers ...

    African Journals Online (AJOL)

    The study examined the perception of project participants and extension officers regarding marketing of agricultural produce in agricultural projects in the North West Province. The objective of the study was primarily to compare the perceptions of project participants and extension officers. When establishing a project, ...

  1. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  2. Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2018-03-01

    Full Text Available One of the highly rated causes of poor performance is errors in contract documents. The objectives of this study are to investigate the prevalent errors in contract documents and their effects on construction projects. Questionnaire survey and 51 case study projects (mixed method were adopted for the study. The study also involved the use of Delphi technique to extract the possible errors that may be contained in contract documents; it did not however constitute the empirical data for the study. The sample of the study consists of 985 consulting and 275 contracting firms that engaged in the construction of building projects that were completed between 2013 and 2016 and were above the ground floor. The two-stage stratified random sampling technique was adopted for the study. The data for the study were analysed with descriptive and inferential statistics (based on Shapiro-Wilk’s test. The results of the study indicate that errors in contract documents were moderately prevalent. However, overmeasurement in bill of quantities was prevalent in private, institutional and management procured projects. Traditionally procured projects contain 68% of the errors in contract documents among the procurement methods. Drawings contain the highest number of errors, followed by bill of quantities and specifications. The severe effects of errors in contract documents were structural collapse, deterioration of buildings and contractors’ claims among others. The result of the study implies that, management procurement method is the route to error minimization in developing countries, but it may need to be backed by law and guarded against overmeasurement.

  3. Principles of European Contract Law

    DEFF Research Database (Denmark)

    Lando, Ole; Beale, Hugh

    This text provides a comprehensive guide to the principles of European contract law. They have been drawn up by an independent body of experts from each Member State of the EU, under a project supported by the European Commission and many other organizations. The principles are stated in the form...... of articles, with a detailed commentary explaining the purpose and operation of each article and its relation to the remainder. Each article also has extensive comparative notes surveying the national laws and other international provisions on the topic. "The Principles of European Contract Law Parts I &...... in developing a common European legal culture. The European Parliament has twice called for the creation of a European Civil Code. The principles of European contract law are essential steps in these projects. This text provides a comprehensive guide to the Principles of European contract law. They have been...

  4. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  5. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  6. Relationship Contracting: The South Australian Experience - A Case Study

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available The construction industry has long been accusedof poor performance. The confrontational attitudeof its members and the resultant adversarial atmosphere has been identified as a major factor responsible for this poor performance. A cultural change is required to remove these barriers and to promote optimum project outcomes. Relationship contracting is promoted as a way to support the shift from the adversarial culture to the co-operative and collaborative culture within the industry and the project team.The Adelaide Convention Centre Extensions project was the first in South Australia to be procure und r the principles of relationship contract1ng. Usmg the case study approach, this paper reviews the form of relationship contracting used in this milestone project. The paper documents the lessons learned from this project and makes recommendations that can lead to improvements for future projects.

  7. Economic case for CANDU life extension projects

    International Nuclear Information System (INIS)

    Qureshi, S.; Tenev, T.; Lewi, M.

    2014-01-01

    As CANDU reactors approach their original end of design life utilities are faced with two options: to extend the operating life of the reactor by undergoing a life extension project (LEP), or to commence decommissioning activities. Recent project experience has shown that there is economic merit in extending the life of the operating reactor. There are many benefits to such a decision, the most obvious being the revenue that will be generated from the additional years of electricity production by the utility. Delays in decommissioning are also advantageous since the large costs associated with such a long-term activity are pushed into the future, thereby decreasing the net present value (NPV) of the investment. In addition, relatively few power reactors have been fully decommissioned to date and deferring this activity transfers the associated risks to others that are currently obligated to undertake decommissioning activities sooner. Candu Energy has been involved with the life extension projects of the following CANDU reactors: Point Lepreau (New Brunswick, Canada), Bruce Unit 1 and Unit 2 (Ontario, Canada), and Wolsong Unit 1 (South Korea). These reactors underwent fuel channel replacement programs in addition to replacement of major reactor components. Most recently, both Ontario Power Generation (OPG) and Nucleoelectrica Argentina Sociedad Anonima (NA-SA) have commenced work on life extension projects at the Darlington (Canada) and Embalse (Argentina) sites respectively. The experience gained from previous LEP projects allows Candu Energy to deliver future projects in a timely, efficient, and cost effective manner. (author)

  8. A Social Contract for University-Industry Collaboration: A Case of Project-Based Learning Environment

    Science.gov (United States)

    Vartiainen, Tero

    This study determines a social contract for a form of university-industry collaboration to a project-based learning environment in close collaboration with industry. The author's previous studies on moral conflicts in a project-based learning (PjBL) environment and his 5-year engagement in the PjBL environment are used as background knowledge, and John Rawls' veil of ignorance is used as a method in the contract formulation. Fair and impartial treatment of actors is strived for with the contract which constitutes of sets of obligations for each party, students, clients, and university (instructors) in the chosen project course. With the contract fair and impartial treatment of actors is strived for and the most dilemmatic moral conflicts are tried to be avoided. The forming of the social contract is evaluated, and implications for research and collaborations in practice are offered.

  9. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  10. 5 CFR 470.315 - Project modification and extension.

    Science.gov (United States)

    2010-01-01

    ... provisions of approved project plans will not be modified, duplicated in organizations not listed in the... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project modification and extension. 470... PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  11. Client’s flexibility in renovation projects with long-term DBFMO contracts

    NARCIS (Netherlands)

    Kuhlmann, M.; Blokhuis, E.G.J.; Han, Q.; Schaefer, W.F.; Yildiz, H.T.

    2009-01-01

    Construction project clients are faced with long-term commitments when opting for a DBFMO contract, the Dutch version of PFI. This way of contracting is characterized by the delivery of a full housing service to the client over a period of decades, offered by a construction consortium including

  12. The interplay between formal and informal contracting in integrated project delivery

    NARCIS (Netherlands)

    Bygballe, L.E.; Dewulf, Geert P.M.R.; Levitt, R.

    2015-01-01

    This research examines the interplay between formal and informal contracting in integrated project delivery (IPD). It investigates how the interplay enables parties in health-care construction projects to cope with uncertainty and complexities, due to, among others, changing demands. New delivery

  13. An extension to artifact-free projection overlaps

    International Nuclear Information System (INIS)

    Lin, Jianyu

    2015-01-01

    Purpose: In multipinhole single photon emission computed tomography, the overlapping of projections has been used to increase sensitivity. Avoiding artifacts in the reconstructed image associated with projection overlaps (multiplexing) is a critical issue. In our previous report, two types of artifact-free projection overlaps, i.e., projection overlaps that do not lead to artifacts in the reconstructed image, were formally defined and proved, and were validated via simulations. In this work, a new proposition is introduced to extend the previously defined type-II artifact-free projection overlaps so that a broader range of artifact-free overlaps is accommodated. One practical purpose of the new extension is to design a baffle window multipinhole system with artifact-free projection overlaps. Methods: First, the extended type-II artifact-free overlap was theoretically defined and proved. The new proposition accommodates the situation where the extended type-II artifact-free projection overlaps can be produced with incorrectly reconstructed portions in the reconstructed image. Next, to validate the theory, the extended-type-II artifact-free overlaps were employed in designing the multiplexing multipinhole spiral orbit imaging systems with a baffle window. Numerical validations were performed via simulations, where the corresponding 1-pinhole nonmultiplexing reconstruction results were used as the benchmark for artifact-free reconstructions. The mean square error (MSE) was the metric used for comparisons of noise-free reconstructed images. Noisy reconstructions were also performed as part of the validations. Results: Simulation results show that for noise-free reconstructions, the MSEs of the reconstructed images of the artifact-free multiplexing systems are very similar to those of the corresponding 1-pinhole systems. No artifacts were observed in the reconstructed images. Therefore, the testing results for artifact-free multiplexing systems designed using the

  14. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  15. Esmeralda project for studying extensive sodium fire

    International Nuclear Information System (INIS)

    Sophy, Y.M.; Roy, D.; Bentz, A.; Gerosa, A.; Noel, H.

    1979-01-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  16. Nuclear Energy Gradients for Internally Contracted Complete Active Space Second-Order Perturbation Theory: Multistate Extensions.

    Science.gov (United States)

    Vlaisavljevich, Bess; Shiozaki, Toru

    2016-08-09

    We report the development of the theory and computer program for analytical nuclear energy gradients for (extended) multistate complete active space perturbation theory (CASPT2) with full internal contraction. The vertical shifts are also considered in this work. This is an extension of the fully internally contracted CASPT2 nuclear gradient program recently developed for a state-specific variant by us [MacLeod and Shiozaki, J. Chem. Phys. 2015, 142, 051103]; in this extension, the so-called λ equation is solved to account for the variation of the multistate CASPT2 energies with respect to the change in the amplitudes obtained in the preceding state-specific CASPT2 calculations, and the Z vector equations are modified accordingly. The program is parallelized using the MPI3 remote memory access protocol that allows us to perform efficient one-sided communication. The optimized geometries of the ground and excited states of a copper corrole and benzophenone are presented as numerical examples. The code is publicly available under the GNU General Public License.

  17. Application and Assessment of Extension of Time Claim: Findings of Case Studies Conducted in Malaysia

    Directory of Open Access Journals (Sweden)

    M.S. Mohd Danuri,

    2006-12-01

    Full Text Available It is a common phenomenon for construction projects to have applications for extension of time. Many problems are encountered in practice in the application and preparation of extension of time claims. A study was conducted to identify the main problems encountered in the application and assessment of extension of time claim in selected construction projects in Malaysia. Three (3 case studies have been used 10 investigate the extension of time issues. Findings from the study revealed that local contractors usually fail to comply with the contract procedural requirements to submit timely notification of delay and have difficulty in demonstrating their entitlement for extension of time. The main problem faced by contract administrators is that contractors tend to "inflate" their extension of time entitlement with the intention to maximise their claims. Adherence to the agreed procedure in preparing and evaluating of delay claims and the implementation of a set of agreed standardised delay analysis may help to minimize the frequency and impact of such problems.

  18. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  19. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  20. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  1. Flexibility in PPP contracts : Dealing with potential change in the pre-contract phase of a construction project

    NARCIS (Netherlands)

    Demirel, H.C.; Leendertse, W.L.; Volker, L.; Hertogh, M.J.C.M.

    2016-01-01

    Public Private Partnerships (PPPs) cover a range of possible relationships between public and private parties. PPP contracts are typically used in contexts of great uncertainty, such as large construction and infrastructure projects that are realized over a longer period of time. Hence, a major

  2. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Science.gov (United States)

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  3. Variations in government contract in Malaysia

    Directory of Open Access Journals (Sweden)

    Jaspal Singh Nachatar

    2010-12-01

    Full Text Available The complexity of construction works means that it is hardly possible to complete a project without changes to the plans or the construction process itself. There can only be a minority of contracts of any size in which the subject matter when completed is identical in every respect with what was contemplated at the outset. As such, variations are inevitable in even the best-planned contracts. This study is attempted to examine the ways a variation was formed in law and project, in finding out whether the Standard Form of Contract used in Malaysia particularly the government Public Works Department (PWD form has been utilized to the best level in variation cases. Additionally, this study examined the benefits of variations to parties in contract and also provides suggestions and assumptions in an effort to contribute solutions to issues and problem detected. The research methodology used in this study was an extensive review of relevant literature, case study, empirical questionnaires and structured interviews and general observations based on experience and surroundings. The academic study approach incorporated stages such as initial understanding, data and information gathering, analysis of data, findings and conclusion and general suggestions in the study. The major findings of this study, among others, revealed that the existences of variations are common in projects. The main cause of variations was due to client request because of inadequate project objectives for the designer to develop comprehensive design. Besides, the analysis pointed out that the government form of contract the Public Works Department (PWD 203/203A can help in overcoming projects with variation because of the clear defined procedure. This study also found that proper planning and coordination at tender stage can minimize the risk of ‘unwanted’ variations. In conclusion, this study recommended that future research should be done in design and build based contract

  4. The ESMERALDA project for studying extensive sodium fire

    International Nuclear Information System (INIS)

    Sophy, Y.M.; Roy, D.; Noel, H.; Gerosa, A.

    1979-08-01

    This paper describes the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The motivations which prompted the decision to create this research facility are related to construction of the Super-Phenix breeder reactor and to the scale effect problems posed by the use of very large quantities of sodium. Information is included on the dimensions of the installation, the objectives of the project, the means to be employed, the timetable to be followed, and the organization which was created for this project within the context of Franco-Italian cooperation

  5. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  6. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  7. 10 CFR 905.32 - Resource extensions and resource pool size.

    Science.gov (United States)

    2010-01-01

    ... 905.32 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Power Marketing Initiative... begin, to existing customers with long-term firm power contracts. The remaining unextended power will be... Projects. (b) At two 5-year intervals after the effective date of the extension to existing customers...

  8. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  9. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  10. Reengineering and health physics within the project Hanford management contract

    International Nuclear Information System (INIS)

    Atencio, E.M.

    1997-01-01

    The impending transition of the Hartford Site management and operations (M ampersand O) contract to a management and integrating (M ampersand I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the 're-engineering' of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M ampersand O to the M ampersand I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor's Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M ampersand I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved

  11. The Roland Maze Project - school-based extensive air shower network

    International Nuclear Information System (INIS)

    Feder, J.; Jedrzejczak, K.; Karczmarczyk, J.; Lewandowski, R.; Swarzynski, J.; Szabelska, B.; Szabelski, J.; Wibig, T.

    2006-01-01

    We plan to construct the large area network of extensive air shower detectors placed on the roofs of high school buildings in the city of Lodz. Detection points will be connected by INTERNET to the central server and their work will be synchronized by GPS. The main scientific goal of the project are studies of ultra high energy cosmic rays. Using existing town infrastructure (INTERNET, power supply, etc.) will significantly reduce the cost of the experiment. Engaging high school students in the research program should significantly increase their knowledge of science and modern technologies, and can be a very efficient way of science popularisation. We performed simulations of the projected network capabilities of registering Extensive Air Showers and reconstructing energies of primary particles. Results of the simulations and the current status of project realisation will be presented

  12. 75 FR 37780 - Proposed Waivers and Extensions of Project Periods: Presidential Academies and Congressional...

    Science.gov (United States)

    2010-06-30

    ... the teaching of history. We seek this waiver and extension of project period in order to enable each... or the teaching of history. The Secretary certifies that the proposed waiver and extension of project... American History and Civics Education, and 34 CFR 75.261(c)(2), as it applies to the project funded under...

  13. Using R-Project for Free Statistical Analysis in Extension Research

    Science.gov (United States)

    Mangiafico, Salvatore S.

    2013-01-01

    One option for Extension professionals wishing to use free statistical software is to use online calculators, which are useful for common, simple analyses. A second option is to use a free computing environment capable of performing statistical analyses, like R-project. R-project is free, cross-platform, powerful, and respected, but may be…

  14. Convergence Properties of Projection and Contraction Methods for Variational Inequality Problems

    International Nuclear Information System (INIS)

    Xiu, N.; Wang, C.; Zhang, J.

    2001-01-01

    In this paper we develop the convergence theory of a general class of projection and contraction algorithms (PC method), where an extended stepsize rule is used, for solving variational inequality (VI) problems. It is shown that, by defining a scaled projection residue, the PC method forces the sequence of the residues to zero. It is also shown that, by defining a projected function, the PC method forces the sequence of projected functions to zero. A consequence of this result is that if the PC method converges to a nondegenerate solution of the VI problem, then after a finite number of iterations, the optimal face is identified. Finally, we study local convergence behavior of the extragradient algorithm for solving the KKT system of the inequality constrained VI problem

  15. THE PROFESSIONAL QUALIFICATION SOLIDARY EXTENSION PROJECT AT ELECTRONICS: TECHNICAL AUXILIAR

    Directory of Open Access Journals (Sweden)

    Glaucio Lopes Ramos

    2009-10-01

    Full Text Available This paper has the objective to present the extension course “professional qualification solidary extension project at electronics: technical auxiliar” in the Electrical Engineering course in the University Center of Belo Horizonte, as a professional qualification activity that make possible to young, adults and elderly people from poor communities the social inclusion and an opportunity to improve their access to the labor market. The course is part of extension program of Uni-BH, UniTrabalho e Renda, that is offered since 2006. The responsible for the course are professors and students of the Electrical Engineering course, and an electricity project is also offered. This paper presents the results of an evaluation that is made for the students at the beginning and at the end of the course and showed that the concepts had been assimilated by the students and the expectation of them related to the insertion at labor market is also improved.

  16. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  17. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  18. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  19. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  20. Duration and extension of scope contracts with public entities

    Directory of Open Access Journals (Sweden)

    Kristian Rodrigo Pscheidt

    2016-12-01

    Full Text Available Brazilian Government is guided by the principles of legality and effectiveness. For example, there are the administrative contracts and tender procedures, according to the provisions of Law n. 8.666/1993. It happens that there is legislative omission about the scope contracts, in particular regarding the validity period and renovation. In this vacuum, Tribunals has followed the guidance of the Union General Attorney, which requires new bidding process whenever expires the contract. But that guidance can not be followed without restriction, under penalty of violation of effectiveness indicated in Article 37 of the Constitution. This occurs, for example, in hiring law firms and accounting advice in scope, with fees tied to the success.

  1. Improved contraction schemes for projected entangled pair states

    Energy Technology Data Exchange (ETDEWEB)

    Lubasch, Michael; Cirac, Juan Ignacio; Banuls, Mari-Carmen [Max Planck Institute of Quantum Optics, Hans-Kopfermann-Strasse 1, 85748 Garching (Germany)

    2013-07-01

    Projected Entangled Pair States (PEPS) represent the natural generalization of Matrix Product States (MPS) in higher dimensions. The strength of MPS in the numerical simulation of 1D quantum many-body systems is well established, as they are the variational class of states underlying the Density Matrix Renormalization Group and the latter is nowadays considered numerically exact for systems comprising hundreds of quantum particles. In algorithms based on MPS or PEPS, the bond dimension D of the state determines the number of variational parameters and the computational cost. While bond dimensions on the order of hundreds and thousands are feasible with MPS, standard 2D PEPS algorithms are limited to values in the range 2 to 6 due to the much worse scaling of the computational cost with D. Recently, a new algorithm based on an alternative contraction has been proposed that reduces this cost significantly. It resorts to the single-layer picture where the contraction is done in ket and bra separately. We investigate the advantages and disadvantages of this algorithm which can be understood in terms of the PEPS's boundary approximation.

  2. Technical note: Analysis of claims and disputes in contracts for oil and gas development projects in Iran with solutions

    Directory of Open Access Journals (Sweden)

    Fathollah Sajedi

    2017-08-01

    Full Text Available Contracts for oil and gas development projects are naturally complex, they are explained with some of maps and technical specifications. To supply the goals of contracts, it is necessary to construct by a team having owner, consulting engineer and contractor. The unique aspects of each project and team working are resulting to disagreements. It should be noted that the majority of team workers have not previously worked together. It may not be expected to forecast all project aspects in design and preparation of tender documents process. However, in some cases it will occur inconsistencies in contract documents and possibly may be disagreements on commentary of the cases which there are in the provisions of the contract. Every root of disagreement resulted in to claim and finally dispute. Lack of foresight and/or existing ambiguous texts in some provisions of contract, not being aware of components of the project to conditions and obligations and rules of contract will complex and sometimes impossible the agreement on implementation problems. Therefore, the claims will be resulted in disputes and inflict financial losses to contractors and/or owners and then the projects will not be completed. In Iran many activities have not been carried out about claims and disputes in different orientations especially in areas futures and hence, it was studied in this research. Firstly, research history was considered and the causes of claims and disputes were identified in process of different levels of oil projects construction from primary to exploitation and then a questionnaire was prepared using the comments of experts. Finally, the questionnaire was analysed by SPSS and the approved factors in creation of claims and disputes and in their roots were ranked.

  3. Engineering and construction projects for oil and gas processing facilities: Contracting, uncertainty and the economics of information

    International Nuclear Information System (INIS)

    Berends, Kees

    2007-01-01

    The amount of oil and gas processing capacity required to meet demand during the next 20 years is more than twice the amount realised during the last decades. Engineering and Construction contractors (ECs) play a key role in the development and implementation of Large Engineering and Construction Projects (LECPs) for these facilities. We examine the characteristics of LECPs, demand and supply of the contracting market and the strategies traditionally adopted by owners to contract out the development and implementation of these projects to ECs. We demonstrate that these traditional strategies are not longer effective, in the current 'sellers market', to mitigate the oligopolistic economic inefficiencies. As the 'overheating' of the contracting market is expected to continue for a considerable period of time, alternative contracting strategies are required. Contract theory, particularly the economics of information on LECPs, indicates how alternative contracting strategies can be used to overcome economic inefficiencies. The effective use of these alternative strategies requires increased owner involvement and their effectiveness is contingent upon owner competency and ECs acting as the owner's agent rather than its adversary. This will require an organisational and behavioural change process for both owners and ECs

  4. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  5. Strategic urban projects in Amsterdam and New York : Incomplete contracts and good faith in different legal systems

    NARCIS (Netherlands)

    Van der Veen, M.; Korthals Altes, W.K.

    2009-01-01

    Contracts between local government and private investment agencies play an important role in strategic urban projects. Real estate cycles provide only a narrow window of opportunity within which to draft such contracts. A legal system should therefore not impede the possibility of reaching an

  6. Temporary labour contracts

    CERN Document Server

    2001-01-01

    At its September 2000 meeting, the Finance Committee approved a second one-year extension of the four existing temporary labour contracts (L020/PE, L021/PE, L022/PE, L023/PE) until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices. The Finance Committee is invited: - to take note that the estimated annual expenditure on temporary labour in 2001 will amount to approximately 4 500 000 Swiss francs against the previously estimated 6 000 000 Swiss francs; - to approve the extension of the four existing contracts by six months to 30 June 2002 for an overall amount not exceeding 1 500 000 Swiss francs; - to take note that new contracts for the Swiss part of the CERN site will be submitted for adjudication in December 2001 and that new contracts for the French part of the CERN site will be submitted for adjudication in the course of 2002.

  7. Proposal for the extension of a partner project agreement with ISTC ? ATLAS collaboration

    CERN Document Server

    2000-01-01

    This document concerns the extension of the scope of work covered by a partner project agreement with the ISTC, namely Partner Project Agreement 1800p for Manufacturing, Assembly and Testing of the End-cap Transition Radiation Tracker (TRT) for the ATLAS Experiment at the CERN LHC. This Partner Project Agreement was approved by Council on 23 June 2000 (c.f. draft minutes of the meeting CERN/2340/Draft). For reasons set out in this document the Finance Committee is invited to approve the extension of the scope of work covered by Partner Project Agreement 1800p to include the Manufacturing, Assembly and Testing of type C End-cap support rings for a total amount of 503 720 Swiss francs.

  8. Proposal for the Extension of a Project Agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2002-01-01

    This document concerns the extension of the scope of work covered by a project agreement with the ISTC, entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medicine and Pharmacology" which was approved by Finance Committee on 19 September 2001 (CERN/FC/4478). For the reasons set out in this document, the Finance Committee is invited to approve the extension of the scope of work covered by the above project agreement for the optimisation of the technology for a total amount of 160 000 US dollars. This extension will be partially funded by two external sponsors (RAYTEST - DE and the UNIVERSITY OF LAUSANNE - CH) at the level of 90 000 US dollars. CERN's contribution, which will be funded by revenue generated by its technology transfer activities, will not exceed 70 000 US dollars. This extension will bring the total amount of the Project Agreement to 935 000 US dollars, of which CERN's total contribution will not exceed 320 000 US dollars...

  9. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  10. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  11. Farmer's market, demonstration gardens, and research projects expand outreach of Extension Master Gardeners

    Science.gov (United States)

    Pamela J. Bennett; Ellen M. Bauske; Alison Stoven O' Connor; Jean Reeder; Carol Busch; Heidi A. Kratsch; Elizabeth Leger; Angela O' Callaghan; Peter J. Nitzche; Jim Downer

    2013-01-01

    Extension Master Gardener (EMG) volunteers are central to expanding the outreach and engagement of extension staff. A workshop format was used at the Annual Conference of the American Society for Horticultural Science on 31 July 2012 in Miami, FL to identify successful management techniques and projects that expand EMG volunteer outreach, leading to increased extension...

  12. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  13. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  14. Towards sustainable infrastructure development through integrated contracts : Experiences with inclusiveness in Dutch infrastructure projects

    NARCIS (Netherlands)

    Lenferink, Sander; Tillema, Taede; Arts, Jos

    Current complex society necessitates finding inclusive arrangements for delivering sustainable road infrastructure integrating design, construction and maintenance stages of the project lifecycle. In this article we investigate whether linking stages by integrated contracts can lead to more

  15. 48 CFR 17.204 - Contracts.

    Science.gov (United States)

    2010-10-01

    .... (f) Contracts may express options for increased quantities of supplies or services in terms of (1... identified as the option. (g) Contracts may express extensions of the term of the contract as an amended... on the purchase of additional supplies or services, or the overall duration of the term of the...

  16. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  17. Extensive Evaluation of Using a Game Project in a Software Architecture Course

    Science.gov (United States)

    Wang, Alf Inge

    2011-01-01

    This article describes an extensive evaluation of introducing a game project to a software architecture course. In this project, university students have to construct and design a type of software architecture, evaluate the architecture, implement an application based on the architecture, and test this implementation. In previous years, the domain…

  18. Global contract automation for E and P: project overview; Contrato global de automacao para E e P: visao geral do projeto

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Luiz Alberto Barbosa; Cintra, Paulo Cesar Vogel; Gaban, Allan Rodrigo Martins [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Corazza, Andre [Altus Sistemas de Automacao S.A., Sao Leopoldo, RS (Brazil)

    2012-07-01

    This paper aims to present a technical overview of Global Contract for Automation (CGA in Portuguese) for the segment of E and P (Exploration and Production) in Oil and Gas. This paper presents the theory of this type of contract showing the first contract of its kind in Brazil, ongoing for Pre-Salt FPSOs. The idea of using this contract as a reference is relate theory to practice. In the study is done an analysis of 'win-win' relationship in when performing pre-detailing and detail engineering, project development and automation directly with the manufacturer of the automation solution. The project herein includes automation and control of eight FPSOs (Float Production Storage and Offloading), to be produced in series. The system contracted in CGA consists of 12 systems and integrated sub-systems related to production process, fire and gas detection and emergency shutdown (shutdown). The eight FPSO have the same design, are replicas of a single project. The CGA has in its scope to interface simultaneously with different contractors: FEED project; hull constructor; construction and assembly of modules; integration of the FPSO and direct contracts with equipment suppliers. It will also be detail in this paper the scope of supply of subsystems equipment, pre-detail and detail engineering services, automation and control systems integration, consistency and testing of automation system and technical assistance for pre operation and operation of the FPSO. (author)

  19. Coexisting contraction-extension consistent with buoyancy of the crust and upper mantle in North-Central Italy

    CERN Document Server

    Aoudia, A; Ismail-Zadeh, A T; Panza, G F; Pontevivo, A

    2002-01-01

    The juxtaposed contraction and extension observed in the crust of the Italian Apennines and elsewhere has, for a long time, attracted the attention of geoscientists and is a long-standing enigmatic feature. Several models, invoking mainly external forces, have been put forward to explain the close association of these two end-member deformation mechanisms clearly observed by geophysical and geological investigations. These models appeal to interactions along plate margins or at the base of the lithosphere such as back-arc extension or shear tractions from mantle flow or to subduction processes such as slab roll back, retreat or pull and detachment. We present here a revisited crust and upper mantle model that supports delamination processes beneath North-Central Italy and provides a new background for the genesis and age of the recent magmatism in Tuscany. Although external forces must have been important in the building up of the Apennines, we show that internal buoyancy forces solely can explain the coexist...

  20. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  1. TWENTY-ONE-YEAR EXTENSION PROJECT PERFORMANCE "LET'S BREASTFEEDING, MOMMY?"

    Directory of Open Access Journals (Sweden)

    Marizete Argolo Teixeira

    2017-05-01

    Full Text Available Research aiming to describe the actions that were developed by the Extension Project "Let's breastfeed, Mom?" During the 21 years of its performance in Jequié / Bahia and identify the difficulties, facilities and progress of the project. This is a descriptive, quantitative-qualitative study. The data were collected in the archived project documents, analyzed through descriptive statistics and content analysis. The results showed that 8,923 registered postpartum women with educational activities and 1,313 domiciliary visits were carried out, as the main actions carried out by the project. The difficulties were: lack of consumer / permanent materials and human resources; As facilities: responsibility and commitment of the members of the project, as well as the support of the transportation service of the institution. The advances were the elaboration of the research project, with insertion of research fellows, creation of the webpage and the logo. It is necessary to reflect on the difficulties and propose measures to remedy them and thus continue to contribute to the promotion, protection and support of breastfeeding in the Municipality, contributing to the reduction of infant morbidity and mortality

  2. 78 FR 9865 - Air Carrier Contract Maintenance Requirements; Extension of Comment Period

    Science.gov (United States)

    2013-02-12

    .... FAA-2011-1136; Notice No. 12-07] RIN 2120-AJ33 Air Carrier Contract Maintenance Requirements... performing contract maintenance that are acceptable to the FAA and to include them in their maintenance... contract their maintenance. At the behest of several of their FAA-certificated air carrier members...

  3. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  4. WIMS library update project: first stage extension

    International Nuclear Information System (INIS)

    Santo, A.C.F. de; Santos Bastos, W. dos.

    1994-09-01

    This paper reports the results of nine structural lattices obtained through the WIMS-TRACA computer program. This work was performed by request of the managers of the WLU/IAEA project, for the extension of the first stage. These benchmark lattices include regular arrays with heavy water and data of the thorium cycle. Besides K ∞ and K eff (employing the experimental buckling to account for the leakages) spectrum index and ratio at reaction rates are also determined for comparison with the experimental values. The input data for each lattice, are given in the appendix to help exploring possible differences in the results. (author). 4 refs, 1 fig, 11 tabs

  5. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  6. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    International Nuclear Information System (INIS)

    Felise, P.; Phillips, J.D.

    1994-01-01

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice

  7. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Felise, P.; Phillips, J.D.

    1994-10-17

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice.

  8. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  9. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  10. Impact of an aquaculture extension project in Bangladesh

    DEFF Research Database (Denmark)

    Rand, John; Tarp, Finn

    2009-01-01

    productivity and the value of fish production per capita among participants. However, in the long run no similar well-determined effect emerges. Second, MAEP appears to have had no significant impact on socioeconomic status as measured by consumption expenditure of participating households. The authors argue......This paper is an impact study of key short- and long-run effects of the Danida supported Mymensingh Aquaculture Extension Project (MAEP) in Bangladesh, applying different matching and double difference estimators. Results are mixed. First, the paper finds a positive short-run impact on pond...

  11. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  12. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  13. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  14. R and D contract management systems in the USA; Beikoku ni okeru R and D contract kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Outlined herein are the US Government's R and D contract management, which is considered to have greatly contributed to promotion of innovation in the USA. The procedures for the R and D contracts are managed through the mechanisms of the (government procurement), following the FAR (Federal Acquisition Regulations) that govern the government procurement rules. The procedural flow includes planning, public announcement of inviting the application documents, examination of the applications, negotiations, granting the fund, project management, suspension of the project and completion of the project. The audition sometimes takes several years to complete. The staff managing the individual contract is fairly specialized, and a team consisting of several professionals is responsible for each project. The substantial lifetime training systems the contract officers can receive are established. The alternative contract system encourages the applications from consortiums, and private enterprises frequently tie up with academic organizations to apply for the funds. Granting the funds to consortiums have many advantages, e.g., cost sharing and technological transfer. (NEDO)

  15. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  16. 78 FR 78342 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF DEFENSE Office of the Secretary Extension of Autism Services Demonstration Project... (the Department) Enhanced Access to Autism Services Demonstration Project (Autism Demonstration) under the Extended Care Health Option (ECHO) for beneficiaries diagnosed with an Autism Spectrum Disorder...

  17. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  18. 76 FR 80903 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Science.gov (United States)

    2011-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Extension of Autism Services Demonstration Project... Enhanced Access to Autism Services Demonstration Project under the Extended Care Health Option for beneficiaries diagnosed with an Autism Spectrum Disorder (ASD). Under the demonstration, the Department...

  19. Dike-induced contraction along oceanic and continental divergent plate boundaries

    KAUST Repository

    Trippanera, D.

    2014-10-28

    The axis of divergent plate boundaries shows extension fractures and normal faults at the surface. Here we present evidence of contraction along the axis of the oceanic ridge of Iceland and the continental Main Ethiopian Rift. Contraction is found at the base of the tilted hanging wall of dilational normal faults, balancing part of their extension. Our experiments suggest that these structures result from dike emplacement. Multiple dike injection induces subsidence above and uplift to the sides of the dikes; the transition in between is accommodated by reverse faults and subsequent peripheral inward dipping normal faults. Our results suggest that contraction is a direct product of magma emplacement along divergent plate boundaries, at various scales, marking a precise evolutionary stage and initiating part of the extensional structures (extension fractures and normal faults). Key Points Contraction along divergent plate boundaries results from dike emplacementContraction generates extensional structures along divergent plate boundariesSurface deformation along divergent plate boundaries may be magma induced

  20. Dike-induced contraction along oceanic and continental divergent plate boundaries

    KAUST Repository

    Trippanera, D.; Acocella, V.; Ruch, Joel

    2014-01-01

    The axis of divergent plate boundaries shows extension fractures and normal faults at the surface. Here we present evidence of contraction along the axis of the oceanic ridge of Iceland and the continental Main Ethiopian Rift. Contraction is found at the base of the tilted hanging wall of dilational normal faults, balancing part of their extension. Our experiments suggest that these structures result from dike emplacement. Multiple dike injection induces subsidence above and uplift to the sides of the dikes; the transition in between is accommodated by reverse faults and subsequent peripheral inward dipping normal faults. Our results suggest that contraction is a direct product of magma emplacement along divergent plate boundaries, at various scales, marking a precise evolutionary stage and initiating part of the extensional structures (extension fractures and normal faults). Key Points Contraction along divergent plate boundaries results from dike emplacementContraction generates extensional structures along divergent plate boundariesSurface deformation along divergent plate boundaries may be magma induced

  1. Capital budgeting under relational contracting: optimal ranking and duration criteria for schemes of concession, project-financing and public-private partnership

    OpenAIRE

    Biondi, Yuri

    2009-01-01

    International audience; Project-financing and public-private partnership schemes are joint projects of investment that are generally submitted to investment valuation criteria based on compound discounting. However, the theoretical basis of these criteria is at issue nowadays. According to recent studies on relational contracting economics and behavioral finance, joint projects of investment can be considered as special relational environments where the project's returns improve on alternativ...

  2. Legal issues in power sale contract negotiations

    International Nuclear Information System (INIS)

    Goodwin, L.M.

    1990-01-01

    The Public Utility Regulatory Policies Act of 1978 (PURPA) is the foundation of the cogeneration industry. However, few cogeneration projects could be financed on the basis of PURPA alone. PURPA guarantees project owners the right to sell power at the purchasing utility's Avoided Cost, whatever that may be from time to time. However, the development and financing of a cogeneration project requires a secure and dependable income stream, not a mere guarantee of the right to receive the spot price for power. Accordingly, developers have found that a formal power sale contract with the purchasing utility is a prerequisite to successful project development. This paper summarizes some current issues in power sale contract negotiation, with a particular emphasis on contract terms which shift risks from the utility and its ratepayers to the developer. Many of these trends originally appeared before the advent of competitive bidding systems, but most will continue to affect power sale contracts under competitive bidding, and under IPP project development as well

  3. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  4. 24 CFR 983.203 - HAP contract information.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  5. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  7. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  8. Fossil Energy Program report, 1 October 1976--30 September 1977. [Objectives, progress and plans for each contract or project

    Energy Technology Data Exchange (ETDEWEB)

    Dunning, H. Neal; Batchelor, James; Crim, Winfred; Furlong, Leroy; Harvie, Robert; Hunter, Juanita; Jones, William; Karnes, Anita; Ludwig, Linda; Miller, C. Lowell; Mills, G. Alex; Sacks, Stephen; Watkins, J. Wade; Watson, Coni; Weaver, Val

    1978-08-01

    This report is an integral part of the documentation system of the Fossil Energy Program of the Department of Energy. It contains descriptions of each contract and project, arranged in conformance with planning and budgetary documents. The results of contracts are reported at various intervals, depending on the type of contract, but at least annually. These reports are not listed individually in the ''Publications'' sections but are available from the National Technical Information Service, U.S. Department of Commerce, Springfield, Virginia 22161. The Department of Energy also publishes several abstract journals: Fossil Energy Update, Energy Research Abstracts, and Energy Abstracts for Policy Analysis.

  9. Federal Energy Savings Performance Contracts: Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et seq.

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-12-21

    Document provides clarification and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. It is a supplement to the Federal Energy Management Program's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contract (ESPC) projects.

  10. An Optional Instrument for European Insurance Contract Law

    OpenAIRE

    Mandeep Lakhan; Helmut Heiss

    2010-01-01

    The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law) network, drafting a specific part of the Common Fr...

  11. Temporary labour contracts

    CERN Document Server

    1999-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L021/PE, L022/PE, L023/PE and L024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) will reach the end of their initial three-year contractual period at the end of December 1999. Following the satisfactory execution of these contracts during this period, CERN requests approval to extend them from January 2000 for the first of the two years foreseen in the original adjudication. The Finance Committee is invited: - to take note that the three-year expenditure for Temporary Labour contracts from 1997 to 1999 will not exceed 19 100 000 Swiss francs, compared to the 18 900 000 Swiss francs estimated at the time of the adjudication in March 1996; - to approve an extension of the present Temporary Labour contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs.

  12. transforming agriculture through contracted extension service

    African Journals Online (AJOL)

    ACSS

    Agribusiness Project (KAPAP) is implementing an innovative service delivery model, whose approaches include ... in Kenya and in other developing nations with minimal modifications. ... declining human and financial capital, lack of.

  13. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  14. Performance-based contracts for road projects comparative analysis of different types

    CERN Document Server

    Gajurel, Ashish

    2014-01-01

    This book focuses on the aspects of contracting contracts, basically related to road construction and management contracts. The book presents an analytical study of Performance-Based Road Management and Maintenance (PMMR), Funktionsbauvertrag (FBV) (Function-Based Construction Contract) and Public Private Partnerships (PPP). A separate chapter is also included about the comparative study of these contract types. The book provides useful material for university libraries, construction companies and government departments of construction.

  15. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  16. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  17. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  18. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  19. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  20. ESO Signs Largest-Ever European Industrial Contract For Ground-Based Astronomy Project ALMA

    Science.gov (United States)

    2005-12-01

    ESO, the European Organisation for Astronomical Research in the Southern Hemisphere, announced today that it has signed a contract with the consortium led by Alcatel Alenia Space and composed also of European Industrial Engineering (Italy) and MT Aerospace (Germany), to supply 25 antennas for the Atacama Large Millimeter Array (ALMA) project, along with an option for another seven antennas. The contract, worth 147 million euros, covers the design, manufacture, transport and on-site integration of the antennas. It is the largest contract ever signed in ground-based astronomy in Europe. The ALMA antennas present difficult technical challenges, since the antenna surface accuracy must be within 25 microns, the pointing accuracy within 0.6 arc seconds, and the antennas must be able to be moved between various stations on the ALMA site. This is especially remarkable since the antennas will be located outdoor in all weather conditions, without any protection. Moreover, the ALMA antennas can be pointed directly at the Sun. ALMA will have a collecting area of more than 5,600 square meters, allowing for unprecedented measurements of extremely faint objects. The signing ceremony took place on December 6, 2005 at ESO Headquarters in Garching, Germany. "This contract represents a major milestone. It allows us to move forward, together with our American and Japanese colleagues, in this very ambitious and unique project," said ESO's Director General, Dr. Catherine Cesarsky. "By building ALMA, we are giving European astronomers access to the world's leading submillimetre facility at the beginning of the next decade, thereby fulfilling Europe's desire to play a major role in this field of fundamental research." Pascale Sourisse, Chairman and CEO of Alcatel Alenia Space, said: "We would like to thank ESO for trusting us to take on this new challenge. We are bringing to the table not only our recognized expertise in antenna development, but also our long-standing experience in

  1. 24 CFR 983.202 - Purpose of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Purpose of HAP contract. 983.202... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.202 Purpose of HAP contract. (a) Requirement. The PHA must enter into a HAP contract with the owner. The HAP contract must be...

  2. 32 CFR 3.9 - Follow-on production contracts.

    Science.gov (United States)

    2010-07-01

    ...) Use competition to select parties for participation in the OT prototype agreement and evaluate the... THAN CONTRACTS, GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.9 Follow-on production contracts. (a) Authority. A competitively awarded OT agreement for a prototype project that satisfies the...

  3. Extensible Adaptive System for STEM Learning

    Science.gov (United States)

    2013-07-16

    Copyright 2013 Raytheon BBN Technologies Corp. All Rights Reserved ONR STEM Grand Challenge Extensible Adaptive System for STEM Learning ...Contract # N00014-12-C-0535 Raytheon BBN Technologies Corp. (BBN) Reference # 14217 In partial fulfillment of contract deliverable item # A001...Quarterly Progress Report #2 April 7, 2013 –July 6, 2013 Submitted July 16, 2013 BBN Technical POC: John Makhoul Raytheon BBN Technologies

  4. LXI Technologies for Remote Labs: An Extension of the VISIR Project

    OpenAIRE

    Jaime Irurzun; Olga Dziabenko; Pablo Orduña; Diego Lopez-de-Ipiña; Ignacio Angulo; Javier García-Zubia; Unai Hernandez-Jayo

    2010-01-01

    Several remote labs to support analog circuits are presented in this work. They are analyzed from the software and the hardware point of view. VISIR remote lab is one of these labs. After this analysis, a new VISIR remote lab approach is presented. This extension of the VISIR project is based on LXI technologies with the aim of becoming it in a remote lab easily interchangeable with other instruments. The addition of new components and experiments is also easier and cheaper.

  5. Governance variety in the energy service contracting market

    Energy Technology Data Exchange (ETDEWEB)

    Ostertag, Katrin; Huelsmann, Friederike

    2008-07-01

    There is a surprisingly high variety of actors involved in the supply of energy service contracting arrangements. Based on an empirical record of approximately 2,500 contracting projects in the domain of space heating in Germany, the paper analyses specialisation patterns of contractors. An econometric model is used to test hypotheses derived from transaction cost economics, which contractor type should be expected for which kind of contracting project. According to our results, if physical, site and human asset specificity are high, governance modes are preferred, for which contracting represents a downward integration of business activities along the value-added chain. This includes the supply of contracting by municipal utilities. More specifically, municipal utilities occur as superior suppliers of contracting if combined heat and power is implemented, if the building served is connected to their gas grid and if it is a public building. This pattern could orient the development of contracting activities for utilities reconsidering their strategic position following the liberalisation of the electricity market. (orig.)

  6. Software Support for Industrial Controls Contract

    CERN Document Server

    Sánchez-Corral, E

    2001-01-01

    The contract covers the development and the operation and maintenance (O&M) of the monitoring and control systems used for supervising CERN's technical infrastructure. The contract involves those responsible for equipment in any current or future technical installation. We are outsourcing a complex activity which will require efforts on both preparing the specifications for new projects and setting clear definitions of tasks and procedures for O&M. It is a result-oriented contract in which performance will be continually evaluated by different methods and tools: project management plan and project follow-up, and CAMMS (Computerised Assets and Maintenance Management system). To be used effectively, this approach requires complete traceability of activities and documentation of the systems. Based on the analysis of the results measured and the shared (CERN and contractor) experience, the O&M activities will be reviewed and reorganised and operational procedures will be changed according to needs. A ...

  7. 24 CFR 983.205 - Term of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 983.205... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.205 Term of HAP contract. (a) Ten-year initial term. The PHA may enter into a HAP contract with an owner for an initial...

  8. Differential substrate subsidence of the EnviHUT project pitched extensive green roof

    Directory of Open Access Journals (Sweden)

    Nečadová Klára

    2017-01-01

    Full Text Available In primary phase of testing building physical characteristics of the EnviHUT project extensive and semi-intensive roofs with 30° inclination occurred exceptional substrate subsidence. An extensive testing field with retaining geocell-system evinced differential subsidence of individual sectors after six months. Measured subsidence of installed substrate reached 40 % subsidence compared to originally designed height (intended layer thickness. Subsequent deformation of geocell-system additionally caused partial slide of substrate to drip edge area. These slides also influenced initial development of stonecrop plants on its surface. Except functional shortages the aesthetical function of the whole construction is influenced by the mentioned problem. The stated paper solves mentioned issues in view of installation method optimization, selection and modification of used roof substrate and in view of modification of geometric and building installed elements retaining system arrangement. Careful adjustment of roof system geometry and enrichment of original substrate fraction allow full functionality from pitched extensive green roof setting up. The modification scheme and its substantiation is a part of this technical study output.

  9. LXI Technologies for Remote Labs: An Extension of the VISIR Project

    Directory of Open Access Journals (Sweden)

    Jaime Irurzun

    2010-09-01

    Full Text Available Several remote labs to support analog circuits are presented in this work. They are analyzed from the software and the hardware point of view. VISIR remote lab is one of these labs. After this analysis, a new VISIR remote lab approach is presented. This extension of the VISIR project is based on LXI technologies with the aim of becoming it in a remote lab easily interchangeable with other instruments. The addition of new components and experiments is also easier and cheaper.

  10. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  11. 24 CFR 891.565 - Term of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Term of HAP contract. 891.565... 8 Assistance § 891.565 Term of HAP contract. The term of the HAP contract for assisted units shall be 20 years. If the project is completed in stages, the term of the HAP contract for assisted units...

  12. Essence of Time in Construction Contracts

    Directory of Open Access Journals (Sweden)

    Tony Lim

    2012-11-01

    Full Text Available The building industry has in recent years seen huge costs incurreddue to disputes arising on notice requirement clauses. Theseclaims could have been averted if the parties had been diligent inproviding the necessary notices. This article sets out to explorethe law briefl y as interpreted by the courts in common law andequity and discuss the possibility of defence under the principle ofpromissory estoppel. More importantly it also shares the author’sview on how such pitfalls could have been prevented by givingthe proper notices within the timeline required by the contractconditions. It cannot be emphasised enough that contractorswould be wise to comply strictly with the notice provisions in thecontract instead of relying on the estoppel principle or waiver orunconscionability to save their day. Notice clauses essentiallyrequire a competent contracts administrator to follow the time lineprovided in the contract conditions and would be most effective ifthe project team worked closely with the contracts administratorto ensure that proper notices are given when directions orinstructions are received. Although it is common to see noticeclauses which make it a condition precedent for a contractor to beentitled to claim for an extension of time or loss and expense claimbeing interpreted restrictively, in any litigation or arbitration it isalways diffi cult to predict how the courts or tribunal would be willingto uphold such notice clause. It is therefore in the interest of theparties that notice clauses should be properly observed. Suffi ceto say, failure to comply with a notice clause and time bar may befatal to a claim.

  13. The advantages of cost plus award fee contracts

    Science.gov (United States)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  14. Proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of an amendment to the blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments with the company SOURIAU (CH), for the next three years for up to 600 000 euros (954 600 Swiss francs), subject to revision for inflation from January 2007, bringing the total amount of the blanket purchase contract to a maximum amount of 1 200 000 euros (1 909 200 Swiss francs), subject to revision for inflation from January 2007. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/60/5/e

  15. THE DYNAMICS OF PROJECT-BASED LEARNING EXTENSION COURSES: THE “LABORATORY OF SOCIAL PROJECTS” CASE STUDY

    Directory of Open Access Journals (Sweden)

    Joao Alberto Arantes do Amaral

    2017-01-01

    Full Text Available In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, “Laboratory of Social Projects.” The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of São Paulo (Unifesp, Osasco Campus, Brazil. The course had 72 participants (41 community members and 31 university students. The participants worked in teams of four members (on average and developed 13 projects on behalf of eight NGOs that help people in need. In our research, we followed a mixed methods approach, using unstructured questionnaires and project reports as sources of information. We made use of system thinking analysis to reveal the dynamics that unfolded during the course. Our main findings are: 1 free-of-charge extension courses can be much more challenging to manage than traditional courses; the bureaucracy of getting the university’s approval and problems related to dropouts are issues to consider; 2 the workload of the professors involved can be substantially higher than the workload of similar regular courses; 3 the use of project-based learning techniques can be very effective; 4 the courses can provide a very rich experience to the participants, promoting intense knowledge-sharing among all involved.

  16. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  17. Contract types - turnkey

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    Turnkey or the turnkey type of contract refers to a system of management according to which one organization accepts total responsibility for completing all parts and all phases of a project. In the case of a power project the turnkey contractor undertakes to design the plant, supply or procure and erect the equipment, build the station and put it into operation. (orig./FW) [de

  18. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  19. Galilean contractions of W-algebras

    Directory of Open Access Journals (Sweden)

    Jørgen Rasmussen

    2017-09-01

    Full Text Available Infinite-dimensional Galilean conformal algebras can be constructed by contracting pairs of symmetry algebras in conformal field theory, such as W-algebras. Known examples include contractions of pairs of the Virasoro algebra, its N=1 superconformal extension, or the W3 algebra. Here, we introduce a contraction prescription of the corresponding operator-product algebras, or equivalently, a prescription for contracting tensor products of vertex algebras. With this, we work out the Galilean conformal algebras arising from contractions of N=2 and N=4 superconformal algebras as well as of the W-algebras W(2,4, W(2,6, W4, and W5. The latter results provide evidence for the existence of a whole new class of W-algebras which we call Galilean W-algebras. We also apply the contraction prescription to affine Lie algebras and find that the ensuing Galilean affine algebras admit a Sugawara construction. The corresponding central charge is level-independent and given by twice the dimension of the underlying finite-dimensional Lie algebra. Finally, applications of our results to the characterisation of structure constants in W-algebras are proposed.

  20. Assessment of thermochemical hydrogen production. Project 8994 mid-contract progress report, July 1--November 1, 1977. [Iron chloride and copper sulfate cycles

    Energy Technology Data Exchange (ETDEWEB)

    Dafler, J.R.; Foh, S.E.; Schreiber, J.D.

    1977-12-01

    We have completed the base-case (first-cut) flowsheet analysis for two thermochemical water-splitting cycles that have been under study at the Institute of Gas Technology: a four-step iron chloride cycle (denoted B-1) and a four-step copper sulfate cycle (denoted H-5). In the case of Cycle B-1, an energy balance has located the worst problem areas in the cycle, and flowsheet modifications have begun. Calculations of equilibrium effects due to the hydrolysis of ferrous chloride at pressures high enough to interface with projected hydrogen transmission systems will, apparently, necessitate higher temperature process heat input for this step. Higher pressure operation of some critical separation processes yields more favorable heat balances. For Cycle H-5, the unmodified (base-case) flowsheet indicates that reaction product separations will be relatively simple with respect to Cycle B-1. Work of Schuetz and others dealing with the electrolysis and thermodynamics of HBr/H/sub 2/O/SO/sub 2/ systems is being extensively reviewed. Work plans for this part of the contract are currently being reviewed.

  1. Motor units in vastus lateralis and in different vastus medialis regions show different firing properties during low-level, isometric knee extension contraction.

    Science.gov (United States)

    de Souza, Leonardo Mendes Leal; Cabral, Hélio Veiga; de Oliveira, Liliam Fernandes; Vieira, Taian Martins

    2018-04-01

    Architectural differences along vastus medialis (VM) and between VM and vastus lateralis (VL) are considered functionally important for the patellar tracking, knee joint stability and knee joint extension. Whether these functional differences are associated with a differential activity of motor units between VM and VL is however unknown. In the present study, we, therefore, investigate neuroanatomical differences in the activity of motor units detected proximo-distally from VM and from the VL muscle. Nine healthy volunteers performed low-level isometric knee extension contractions (20% of their maximum voluntary contraction) following a trapezoidal trajectory. Surface electromyograms (EMGs) were recorded from VM proximal and distal regions and from VL using three linear adhesive arrays of eight electrodes. The firing rate and recruitment threshold of motor units decomposed from EMGs were then compared among muscle regions. Results show that VL motor units reached lower mean firing rates in comparison with VM motor units, regardless of their position within VM (P motor units (P = .997). Furthermore, no significant differences in the recruitment threshold were observed for all motor units analysed (P = .108). Our findings possibly suggest the greater potential of VL to generate force, due to its fibres arrangement, may account for the lower discharge rate observed for VL then either proximally or distally detected motor units in VM. Additionally, the present study opens new perspectives on the importance of considering muscle architecture in investigations of the neural aspects of motor behaviour. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. On the Techniques and Tools for Privacy-Preserving Smart Contracts

    Directory of Open Access Journals (Sweden)

    Anastasia A. Barinova

    2017-06-01

    Full Text Available Currently, business processes become more and more complicated. Data used in these processes circulates mainly through the digital communications. Due to these conditions some kind of electronic contracts for business deals becomes necessary. Smart contracts should describe a set of conditions, implemented through some events in the real world and digital systems. The most important requirement for this technology is privacy ensuring. In this work we have explored existing projects of privacy-preserving smart contracts, defined comparison criteria, compared projects and made a conclusion about options required for smart contract frameworks.

  3. Minnesota wood energy scale-up project 1994 establishment cost data

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M. [Oak Ridge National Lab., TN (United States); Pierce, R. [Champion International, Alexandria, MN (United States); Kroll, T. [Minnesota Department of Natural Resources-Forestry, St. Cloud, MN (United States)

    1996-03-18

    The Minnesota Wood Energy Scale-up Project began in late 1993 with the first trees planted in the spring of 1994. The purpose of the project is to track and monitor economic costs of planting, maintaining and monitoring larger scale commercial plantings. For 15 years, smaller scale research plantings of hybrid poplar have been used to screen for promising, high-yielding poplar clones. In this project 1000 acres of hybrid poplar trees were planted on Conservation Reserve Program (CRP) land near Alexandria, Minnesota in 1994. The fourteen landowners involved re-contracted with the CRP for five-year extensions of their existing 10-year contracts. These extended contracts will expire in 2001, when the plantings are 7 years old. The end use for the trees planted in the Minnesota Wood Energy Scale-up Project is undetermined. They will belong to the owner of the land on which they are planted. There are no current contracts in place for the wood these trees are projected to supply. The structure of the wood industry in the Minnesota has changed drastically over the past 5 years. Stumpage values for fiber have risen to more than $20 per cord in some areas raising the possibility that these trees could be used for fiber rather than energy. Several legislative mandates have forced the State of Minnesota to pursue renewable energy including biomass energy. These mandates, a potential need for an additional 1700 MW of power by 2008 by Northern States Power, and agricultural policies will all affect development of energy markets for wood produced much like agricultural crops. There has been a tremendous amount of local and international interest in the project. Contractual negotiations between area landowners, the CRP, a local Resource Conservation and Development District, the Minnesota Department of Natural Resources and others are currently underway for additional planting of 1000 acres in spring 1995.

  4. Successful contracting of prevention services: fighting malnutrition in Senegal and Madagascar.

    Science.gov (United States)

    Marek, T; Diallo, I; Ndiaye, B; Rakotosalama, J

    1999-12-01

    There are very few documented large-scale successes in nutrition in Africa, and virtually no consideration of contracting for preventive services. This paper describes two successful large-scale community nutrition projects in Africa as examples of what can be done in prevention using the contracting approach in rural as well as urban areas. The two case-studies are the Secaline project in Madagascar, and the Community Nutrition Project in Senegal. The article explains what is meant by 'success' in the context of these two projects, how these results were achieved, and how certain bottlenecks were avoided. Both projects are very similar in the type of service they provide, and in combining private administration with public finance. The article illustrates that contracting out is a feasible option to be seriously considered for organizing certain prevention programmes on a large scale. There are strong indications from these projects of success in terms of reducing malnutrition, replicability and scale, and community involvement. When choosing that option, a government can tap available private local human resources through contracting out, rather than delivering those services by the public sector. However, as was done in both projects studied, consideration needs to be given to using a contract management unit for execution and monitoring, which costs 13-17% of the total project's budget. Rigorous assessments of the cost-effectiveness of contracted services are not available, but improved health outcomes, targeting of the poor, and basic cost data suggest that the programmes may well be relatively cost-effective. Although the contracting approach is not presented as the panacea to solve the malnutrition problem faced by Africa, it can certainly provide an alternative in many countries to increase coverage and quality of services.

  5. The North Sea contracting industry

    International Nuclear Information System (INIS)

    Wright, P.J.C.

    1996-09-01

    The North Sea Contracting Industry provides in-depth profiles of major contracting organisations including manpower, facilities, expertise, future directions and financial details. It addresses key issues such as: how will the role of operators and contractors change toward 2000 and beyond?; how will the contractor-operator relationship develop?; will the contractors take a more speculative role in projects such as leasing and contract to produce?; does the future belong to broad skilled providers or small specialised niche players, or both?; and how will rapid technological improvements affect the industry? (author)

  6. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Science.gov (United States)

    2010-01-01

    ... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  7. Muscle activity during knee-extension strengthening exercise performed with elastic tubing and isotonic resistance.

    Science.gov (United States)

    Jakobsen, Markus Due; Sundstrup, Emil; Andersen, Christoffer H; Bandholm, Thomas; Thorborg, Kristian; Zebis, Mette K; Andersen, Lars L

    2012-12-01

    While elastic resistance training, targeting the upper body is effective for strength training, the effect of elastic resistance training on lower body muscle activity remains questionable. The purpose of this study was to evaluate the EMG-angle relationship of the quadriceps muscle during 10-RM knee-extensions performed with elastic tubing and an isotonic strength training machine. 7 women and 9 men aged 28-67 years (mean age 44 and 41 years, respectively) participated. Electromyographic (EMG) activity was recorded in 10 muscles during the concentric and eccentric contraction phase of a knee extension exercise performed with elastic tubing and in training machine and normalized to maximal voluntary isometric contraction (MVC) EMG (nEMG). Knee joint angle was measured during the exercises using electronic inclinometers (range of motion 0-90°). When comparing the machine and elastic resistance exercises there were no significant differences in peak EMG of the rectus femoris (RF), vastus lateralis (VL), vastus medialis (VM) during the concentric contraction phase. However, during the eccentric phase, peak EMG was significantly higher (ptubing (5.7±0.6) compared with knee extensions performed in training machine (5.9±0.5). Knee extensions performed with elastic tubing induces similar high (>70% nEMG) quadriceps muscle activity during the concentric contraction phase, but slightly lower during the eccentric contraction phase, as knee extensions performed using an isotonic training machine. During the concentric contraction phase the two different conditions displayed reciprocal EMG-angle patterns during the range of motion. 5.

  8. Extensibility of the hamstrings is best explained by mechanical components of muscle contraction, not behavioral measures in individuals with chronic low back pain.

    Science.gov (United States)

    Marshall, Paul W M; Mannion, Jamie; Murphy, Bernadette A

    2009-08-01

    To examine the relationship between hamstring extensibility by use of the instrumented straight leg raise; mechanical components of muscle contraction, including muscle recruitment, passive torque measures of tissue stiffness, and eccentric strength; and self-reported measures of pain and disability. Cross-sectional study. University laboratory. Twenty-one individuals with chronic nonspecific axial lower back pain and 15 healthy control subjects. Instrumented straight leg raise, concentric and eccentric hamstring strength, self-reported measures of pain, disability, fear avoidance, general health and well-being Objective measures included hamstring extensibility, hamstring muscle stiffness, absolute and relative concentric/eccentric strength, concentric/eccentric strength ratios. Self-reported measures included Oswestry disability index, visual analog pain scale, fear avoidance beliefs, and general health and well being. Patients with lower back pain had lower range of motion, greater changes in muscle stiffness, and impaired concentric-to-eccentric strength levels. Stepwise regression identified measures of stiffness as significantly predicting hamstring extensibility (adjusted r(2) = 0.58, F = 23.76, P hamstrings also was associated with greater hamstring extensibility. Decreased extensibility of the hamstrings was associated with increased passive stiffness during the common range of motion (20 to 50 degrees ). Impaired stretch tolerance is associated with actual mechanical restriction, not behavioral measures indicating increased pain or fear-avoidant behavior. With no relationship to actual disability and contradictory findings in the literature for the relationship of the hamstrings to the mechanics of the low back, it is unclear whether decreased hamstring extensibility should be targeted in rehabilitation programs for axial lower back pain.

  9. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  10. Anatomy of a cogeneration deal : natural gas contracts and regulatory issues

    International Nuclear Information System (INIS)

    Brett, J.T.

    1999-01-01

    The special features of gas contracts for cogeneration projects were discussed. It was recommended that a gas power purchase contract should be entered early in a project development cycle to justify requests for new pipeline facilities. Issues regarding buyer's commitments, market prices, and volumes were also discussed. In the event of failure to deliver, the contract should include provisions which would make it possible to source gas elsewhere, terminate the contract or seek damages. This paper also discussed various pricing provisions in a gas commodity contract, security of supplies, gas transportation arrangements, regulatory considerations, outstanding issues, and IMO (independent market operator) requirements

  11. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects: effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  12. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects:effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  13. FACTORS INFLUENCING THE ACCURACY OF PRE-CONTRACT STAGE ESTIMATION OF FINAL CONTRACT PRICE IN NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Cong Ji

    2014-12-01

    Full Text Available Establishing and prioritising the factors that may influence the final contract price when responding to a call for tenders is crucial for proper risk analysis and reliable forecasting; it could make or mar the ability to achieve expected profit margin in an era of lump sum fixed price contracts where clients often contest variation claims. In New Zealand, these factors have not been researched; hence estimators rely only on judgement to ‘guess-estimate’ in their price forecasting. This study aimed to fill the knowledge gap by investigating the priority factors. 150 responses from professional members of the New Zealand Institute of Quantity Surveyors were analysed using multi-attribute method. Results showed thirty-seven factors which could influence the final contract price; the three most influential being poor tender documentation, complexity of design & construction, and completeness of project information. Other factors relating to project, client and contractor characteristics, design consultants and tendering conditions, estimating practice and external factors were reported. Concordance analysis indicated high level of agreement amongst survey participants in the rank-ordering of the relative importance of the identified factors. The findings could assist quantity surveyors to prepare more reliable contract price estimates at the pre-contract stage. It would also improve construction-stage cost control.

  14. CONTRACT FARMING PRACTICE IN INDIAN PUNJAB: FARMERS’ PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    Nivedita Sharma

    2014-01-01

    Full Text Available This paper examines the status quo of contract farming in Indian Punjab from the farmers‟ perspective. The analysis is based on the field survey of three districts of the state covering 300 contract farmers. It is observed that agribusiness normalization has taken hold of the CF practice and farmers are facing its brunt. Withdrawal of extension services, reneging on prices and procurement are the major issues afflicting CF. Lack of adjudication is making contract farming exploitative in approach and the study recommends vigilant and strong intervention of the government.

  15. Wartime Construction Project Outcomes as a Function of Contract Type

    Science.gov (United States)

    2016-07-01

    contract types has been well established. The theory of contractual incentives promulgated by Sherer (1964) established expected contractor...behaviors using a max- imization problem. The theory focuses on expected contractor behaviors in incentive contracts (cf. Federal Acquisition Regulation...Scherer, F. M. (1964). The theory of contractual incentives for cost reduction. Quarterly Journal of Economics, 78, 257–280. Tawazuh Commercial and

  16. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  17. Some Extensions of Banach's Contraction Principle in Complete Cone Metric Spaces

    Directory of Open Access Journals (Sweden)

    Raja P

    2008-01-01

    Full Text Available Abstract In this paper we consider complete cone metric spaces. We generalize some definitions such as -nonexpansive and -uniformly locally contractive functions -closure, -isometric in cone metric spaces, and certain fixed point theorems will be proved in those spaces. Among other results, we prove some interesting applications for the fixed point theorems in cone metric spaces.

  18. Utility Energy Services Contracts Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-08-01

    This document describes best practices in the use of Utility Energy Services Contracts. The recommendations were generated by a group of innovative energy managers in many successful projects. The topics include project financing, competition between utility franchises, and water conservation.

  19. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  20. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  1. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model

    Directory of Open Access Journals (Sweden)

    Hong-ze Li

    2013-01-01

    Full Text Available The external economies of wind power engineering project may affect the operational efficiency of wind power enterprises and sustainable development of wind power industry. In order to ensure that the wind power engineering project is constructed and developed in a scientific manner, a reasonable external economies evaluation needs to be performed. Considering the interaction relationship of the evaluation indices and the ambiguity and uncertainty inherent, a hybrid model of external economies evaluation designed to be applied to wind power engineering project was put forward based on the analytic hierarchy process (AHP and matter-element extension model in this paper. The AHP was used to determine the weights of indices, and the matter-element extension model was used to deduce final ranking. Taking a wind power engineering project in Inner Mongolia city as an example, the external economies evaluation is performed by employing this hybrid model. The result shows that the external economies of this wind power engineering project are belonged to the “strongest” level, and “the degree of increasing region GDP,” “the degree of reducing pollution gas emissions,” and “the degree of energy conservation” are the sensitive indices.

  2. 48 CFR 1552.237-70 - Contract publication review procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review... journal article to the Project Officer, and one copy to the Contracting Officer. (d) If the Government has... AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  3. The PREEV project of the Latin American Forum.Regulatory practices on aging and life extension

    International Nuclear Information System (INIS)

    Figueras, J. M.

    2011-01-01

    The American Forum Plenary approved in 2008 the PREEV project, Regulatory Practices in Aging and Life Extension, whose main objective is to improve the regulatory action with regard to the management programs of life and long-term operation of nuclear power plants in the countries of the region Latin American.

  4. LEGAL PRINCIPLES IN FUNCTION AND PERFORMANCE OF BOT CONTRACT

    Directory of Open Access Journals (Sweden)

    Reifon Cristabella Eventia

    2017-09-01

    Full Text Available Build, Operate and Transfer (BOT represents a long term partnership of the government and private sector. In BOT project, either the government or a private sector identifies a need for a development project. The philosophy in BOT contract begins from the increasing infrastructural needs in all areas and with a limited budget, government are required to commit the duties and functions state governance so that the concept of BOT give a solution through a partnership with the private sector. The government then gives a concession to the private sector to build the project and operate it for a fixed period years, after the period ended, the building shall be transferred to the government. Through BOT, the country is able to gain asset without government spending while maintaining a measure of regulatory control over the project. BOT permits the government to use private sector fund to finance public infrastructure development. The main issues elaborated in this article are the legal principle in the formation of BOT contract and the legal principle in the performance of BOT contract. There are two results; firstly, in the formation of a BOT contract, the principles of partnership and the principle of transparency should be emphasized. Secondly, in performance of the BOT contract, the principle of risk management and the principle of proportionality should be clearly stated in the rules and legal norms.

  5. The Texts of the Instruments connected with the Agency's Assistance to the Democratic Republic of the Congo in Continuing a Research Reactor Project Project. Extension Agreement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-11-18

    The text of the Project Extension Agreement between the Agency and the Government of the Democratic Republic of the Congo in connection with the Agency's additional assistance to that Government in continuing a research reactor project is reproduced in this document for the information of all Members. This Agreement entered into force on 27 September 1966.

  6. Multiple Kernel Sparse Representation based Orthogonal Discriminative Projection and Its Cost-Sensitive Extension.

    Science.gov (United States)

    Zhang, Guoqing; Sun, Huaijiang; Xia, Guiyu; Sun, Quansen

    2016-07-07

    Sparse representation based classification (SRC) has been developed and shown great potential for real-world application. Based on SRC, Yang et al. [10] devised a SRC steered discriminative projection (SRC-DP) method. However, as a linear algorithm, SRC-DP cannot handle the data with highly nonlinear distribution. Kernel sparse representation-based classifier (KSRC) is a non-linear extension of SRC and can remedy the drawback of SRC. KSRC requires the use of a predetermined kernel function and selection of the kernel function and its parameters is difficult. Recently, multiple kernel learning for SRC (MKL-SRC) [22] has been proposed to learn a kernel from a set of base kernels. However, MKL-SRC only considers the within-class reconstruction residual while ignoring the between-class relationship, when learning the kernel weights. In this paper, we propose a novel multiple kernel sparse representation-based classifier (MKSRC), and then we use it as a criterion to design a multiple kernel sparse representation based orthogonal discriminative projection method (MK-SR-ODP). The proposed algorithm aims at learning a projection matrix and a corresponding kernel from the given base kernels such that in the low dimension subspace the between-class reconstruction residual is maximized and the within-class reconstruction residual is minimized. Furthermore, to achieve a minimum overall loss by performing recognition in the learned low-dimensional subspace, we introduce cost information into the dimensionality reduction method. The solutions for the proposed method can be efficiently found based on trace ratio optimization method [33]. Extensive experimental results demonstrate the superiority of the proposed algorithm when compared with the state-of-the-art methods.

  7. Blood pressure response to low level static contractions

    DEFF Research Database (Denmark)

    Fallentin, Nils; Jørgensen, Kurt

    1992-01-01

    The present study re-examines the 15% MVC concept, i.e. the existence of a circulatory steady-state in low intensity static contractions below 15% of maximal voluntary contraction (MVC). Mean arterial blood pressure was studied during static endurance contractions of the elbow flexor and extensor...... 0.7) min for elbow extension]. Mean arterial blood pressure exhibited a continuous and progressive increase during the 10% MVC contractions indicating that the 15% MVC concept would not appear to be valid. The terminal blood pressure value recorded at the point of exhaustion in the 10% MVC elbow...... the circulation to the muscles was arrested just prior to the cessation of the contraction, blood pressure only partly recovered and remained elevated for as long as the occlusion persisted, indicating the level of pressure-raising muscle chemoreflexes. Based on blood pressure recordings obtained during...

  8. 48 CFR 31.201-7 - Construction and architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...

  9. Group contractions in quantum field theory

    International Nuclear Information System (INIS)

    Concini, C. De; Vitiello, G.

    1979-01-01

    General theorems are given for SU(n) and SO(n). A projective geometry argument is also presented with disclosure of the occurrence a group contraction mechanism as a geometric consequence of spontaneous breakdown of symmetry. It is also shown that a contraction of the conformal group gives account of the number of degrees of freedom of an n-pseudoparticle system in an Euclidean SU(2) gauge invariant Yang-Mills theory, in agreement with the result obtained by algebraic geometry methods. Low-energy theorems and ordered states symmetry patterns are observable manifestations of group contractions. These results seem to support the conjecture that the transition from quantum to classical physics involves a group contraction mechanism. (author)

  10. Complete Instruction and Project Book for Contracting. A Library Cooperation Tool.

    Science.gov (United States)

    Radcliffe, Walter H.; Kemper, Robert E.

    An important tool for establishing efficient total library service is contracting, which allows a unit of government or a library to obtain the use of the resources of another library according to its specific needs. A contract can cover services to be purchased, financial arrangements, administrative responsibilities, legal considerations, and…

  11. Research on the energy-saving and revenue sharing strategy of ESCOs under the uncertainty of the value of Energy Performance Contracting Projects

    International Nuclear Information System (INIS)

    Qian, Dong; Guo, Ju’e

    2014-01-01

    Under the uncertainty of the value of Energy Performance Contracting Projects (EPCPs), this paper develops a revenue-sharing bargaining model between an Energy Service Company (ESCO) and an Energy-Using Organization (EU). Based on the model the paper analyzes the impacts of energy prices, risk-adjusted discount rates and accidents on the ESCO’s bargaining strategies. The research shows that the greater the probability of adverse circumstances is, the higher is the revenue share (of the EU), and the more disadvantageous is the ESCO’s position in the game. Furthermore, we design a forecast–commitment contract between an ESCO and an EU and analyze the optimal product’s energy savings commitment strategy of the ESCO to cope with uncertain energy savings and contract risk. The research illustrates that by introducing penalties and commitments, the contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent; when the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment, thus enhancing the strategy value of the bilateral relationship and reducing the contract risk. Finally, the policy recommendations about improving shared savings contract standard, third-party energy savings measurement and verification mechanism and arbitration mechanism of EPCs are provided. - Highlights: • We provide a method for determining the revenue-sharing bargaining strategy space in a finite bargaining game of the ESCO. • The increase of the probability of adverse circumstances will increase the revenue share (of the EU). • We design a forecast–commitment contract between an ESCO and an EU. • The forecast–commitment contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent. • When the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment

  12. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  13. Technology News; Distance Education Project: Extending Extension Programming via Telecommunications Technology; [and] Fax for Library Services.

    Science.gov (United States)

    Coyle, Larry; Spitzer, Kathleen L.

    1992-01-01

    Three articles discuss (1) the numbers of microcomputers installed in elementary and secondary schools; (2) a distance education project in the Minnesota Extension Service that used a satellite delivery system and integrated it with a computer information network; and (3) the use of facsimile machines for library services. (LRW)

  14. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Helmut Heiss

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts.Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  15. An Optional Instrument for European Insurance Contract Law

    Directory of Open Access Journals (Sweden)

    Mandeep Lakhan

    2010-08-01

    Full Text Available The Principles of European Insurance Contract Law, also referred tousing the acronym PEICL, were published in September 2009. They are the result of ten years of academic work undertaken by the"Restatement of European Insurance Contract Law" Project Group. In the time since its establishment in 1999, the project has been transformed from being a stand-alone project to a part of the CoPECL (Common Principles of European Insurance Contract Law network, drafting a specific part of the Common Frame of Reference. Having continually worked under the guiding principle that "the law of insurance [in Europe] must be one," it now represents a serious option for providing Europe with a single legal framework for insurance contracts. Despite the European Council's proclamations that the Common Frame of Reference will remain a non-binding instrument, the implementation of one or more optional instruments in the future does not appear to beimprobable considering recent developments. The possibility of anoptional instrument has been expressed more than once by the European Commission in its Action Plan and Communication on European Contract Law. Other indications in favour of an optional instrument include the European Parliament's repeated references to the Common Frame of Reference as providing, at the very least, a model for a futureoptional instrument, as well as the EESC's earlier proposal of anoptional instrument as an alternative to standardising insurancecontract law. The preparation by the EESC of another (own-initiative opinion on European contract law is underway, and its presentation is anticipated in 2010. Hence, the optional instrument is evidently the subject of serious political deliberation. Using Article 1:102, the Principles of European Insurance Contract Law represent a prototype for such an instrument.

  16. 76 FR 79665 - Agency Information Collection Extension

    Science.gov (United States)

    2011-12-22

    .... ACTION: Submission for Office of Management and Budget (OMB) review; comment request. SUMMARY: The... extension of ``Industrial Relations,'' OMB Control Number 1910-0600. This proposed collection covers major Department contractor Human Resource information necessary for contract management, administration, and cost...

  17. Effects of Contract Delivery Method on the LEED(trademark) Score of U.S. Navy Military Construction Projects (Fiscal Years 2004-2006) (CD-ROM)

    National Research Council Canada - National Science Library

    Carpenter, Deanna S

    2005-01-01

    ...: 1 CD-ROM; 4 3/4 in.; 484 KB. ABSTRACT: This research study focused on determining the effects that the two major contract delivery methods had on the LEED score of projects over the design and construction time horizon...

  18. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  19. 24 CFR 983.207 - Condition of contract units.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.207... in accordance with the HQS. The PHA may not make any HAP payment to the owner for a contract unit.... Such remedies include termination of housing assistance payments, abatement or reduction of housing...

  20. 33 CFR 211.109 - Contract of sale.

    Science.gov (United States)

    2010-07-01

    ... Navigation Project in Oklahoma, to Former Owners § 211.109 Contract of sale. Upon determination of the price... and deliver it to the applicant for acceptance. The contract of sale shall provide for the deposit of earnest money equal to twenty (20) percent of the price at which the land will be sold or the estimated...

  1. 49 CFR 1313.7 - Contract summary for grain products-involving a port.

    Science.gov (United States)

    2010-10-01

    ... the contract. (ii) The termination date of the contract, and any terms for automatic extension or... type (e.g. single-car, multiple-car, unit-train) or minimum volume requirements. (6) Special features..., guaranteed car supply, minimum percentage of traffic requirements, credit terms, discounts, etc. (7) Rail car...

  2. Community Development and Divergent Forces in Philippine State Universities and Colleges: Developing a Protocol in Evaluating Extension Projects Towards Community Empowerment

    Directory of Open Access Journals (Sweden)

    Dexter S. Ontoy

    2016-11-01

    Full Text Available Divergent paradigms operate in State Universities and Colleges SUCs, which influence the performance of extension projects towards attainment of full empowerment as the ultimate goal implied by the universally-accepted definition of community development. In particular, a livelihood and environment project of Cebu Normal University (CNU implemented in Caputatan Norte, Medillin, Cebu, Philippines was assessed based on five (5 primary parameters and two (2 secondary parameters. A novel protocol using Delphi Method shows was developed and used for this particular study, which could be adapted in evaluating the performance of community extension projects. In this particular case, the performance of CNU livelihood and environment project falls between ―demonstration‖ and ―community organizing‖. The evaluation shows that there is still a need to reinforce activities to the ultimate goal. However, it is also implied that the secondary parameters are more robust indicators in assessing the outcomes of the project implementation towards full community empowerment.

  3. Extension Systems in Tanzania: Identifying Gaps in Research

    African Journals Online (AJOL)

    their interactions and communication networks among these ..... traders, processors and retailers have contracted extension ..... amount of ex post analysis will be able to get at the larger .... private provision of inputs or purchase of outputs,.

  4. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  5. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  6. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  7. The lifecycle approach as a driver for innovative power contracting; Der Lifecycle-Ansatz als Treiber fuer innovatives Energie-Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Gayer, Alfred [RWE Energiedienstleistungen GmbH (Germany)

    2011-07-01

    The sensible and efficient use of energy raises more and more the general awareness. The efficiency of projects will be influenced not only by the replacement of existing technology, but also mainly by the general conception of the design of decentralized energy supplies. The integration of waste heat from production-related processes as well as the use of all forms of energy such as electricity, heat, refrigeration and compressed air to meet the customer needs in a comprehensive energy plan increase the complexity and significantly the efficiencies. In the implementation of such projects the contracting is becoming increasingly important because the future gains in efficiency are taken into account directly. Contracting projects include the traditional total-cost-of-ownership approach (lifecycle approach). This approach considers the investment costs as well as the consequential costs of a project and shows how to optimize the total cost.

  8. Final report for the protocol extensions for ATM Security Laboratory Directed Research and Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Tarman, T.D.; Pierson, L.G.; Brenkosh, J.P. [and others

    1996-03-01

    This is the summary report for the Protocol Extensions for Asynchronous Transfer Mode project, funded under Sandia`s Laboratory Directed Research and Development program. During this one-year effort, techniques were examined for integrating security enhancements within standard ATM protocols, and mechanisms were developed to validate these techniques and to provide a basic set of ATM security assurances. Based on our experience during this project, recommendations were presented to the ATM Forum (a world-wide consortium of ATM product developers, service providers, and users) to assist with the development of security-related enhancements to their ATM specifications. As a result of this project, Sandia has taken a leading role in the formation of the ATM Forum`s Security Working Group, and has gained valuable alliances and leading-edge experience with emerging ATM security technologies and protocols.

  9. Contracting and building renovation - does it work together?

    Energy Technology Data Exchange (ETDEWEB)

    Tritthart, Wibke; Bruner-Lienhart, Susanne [Inter-Univ. Research Centre for Technology, Work and Culture, Graz (Austria); Bleyl, Jan W.; Bucar, Gerhard [Graz Energy Agency (Austria)

    2007-07-01

    The renovation or refurbishment is an important point in the life cycle of a building that makes it possible to achieve both environmental and climate protection goals and a higher quality of living of the inhabitants. However, lack of money often leads to a renovation that covers only the basic requirements, whereas measures that are valuable in a long term perspective like energy saving measures are not realised. Energy performance contracting (EPC) is widely used as an instrument to reduce long term operating costs significantly by guaranteed energy savings. An energy service company (ESCo) implements saving technologies, especially in the field of heating, HVAC, lighting and plug loads, and in particular in public buildings. It is the aim of this paper to investigate the possibilities to incorporate construction measures like building envelope insulation into standard energy performance contracting.For this purpose a qualitative survey is presented that was performed among experts and stakeholders in the business: ESCos, building owners and facility managers, representatives of construction companies and financing institutions were interviewed. The focus was on their experiences with such projects, on difficulties that arose or barriers that exist from their point of view and on the chances they perceived. This provides the basis for identifying restraints and supporting factors for the integration of contracting and constructional measures.Three pilot projects that have been renovated in Austria are outlined subsequently. They are evaluated with respect to the contractual network between the project partners, types of guarantees and financing issues. Special emphasis is put on the assignment of tasks and the cash flow between the project partners. Various constellations of trades acted as energy service provider: a general contractor, an energy supply company, a consortium of a builder and a plumber. The projects reveal some differences to the standard energy

  10. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  11. Development and perspectives of principles of european insurance contract law

    Directory of Open Access Journals (Sweden)

    Ana Keglević

    2013-01-01

    Full Text Available Summary: Principles of European Insurance Contract Law (PEICL provides for a set of principles, definitions and model rules exclusively addressing general law for insurance contract. This work has been preformed within greater project for the creation of Common frame of reference on European contract law initiated by the Commission in 2003. PEICL is essentially designed to perform two basic functions. It would improve the quality of the EU acquis in the area of contract law, remove differences and achieve higher degree of divergences between contract laws of the Member states, and even help the national legislators when enacting legislation or Courts with the possible interpretation of the acquis. On the other hand PEICL could be adopted as an optional instrument, thus offering the common platform for contracting in the area of insurance law on the EU level. Possible Optional instrument would exist parallel with, rather instead of, national insurance contract laws. European Parliament resolution of 2011 on policy options for progress towards a European Contract Law for consumers and businesses and corresponding Green Paper of 2010 show positive tendency towards optional instrument in the legal form of Regulation. This would suit the requirements of the insurance sector. However, there are numerous signals showing adversely. For that reason this paper analyses the development and the status of Principles of European Insurance Contract Law particularly the status and perspectives of Principles within the project for the creation of European contract law.

  12. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  13. Goodwyn project under way off NW Australia

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the $2 billion (Australian) Goodwyn field development project on Australia's Northwest Shelf is under way with installation of a 17,500 metric ton steel platform jacket. Northwest Shelf project operator Woodside Petroleum Pty. Ltd. and partners are continuing with an extensive exploration program in the Northwest Shelf area. The group expects to begin soon a wide ranging 3-D seismic survey over the WA-28-P license area and the Northwest Shelf production permits. The goal is to identify new and appraise existing oil and gas prospects in the region for an exploratory drilling campaign to begin in first half 1993. Finding more gas reserves would bode well for extending existing LNG contracts with Japan or competing for new markets in Japan, South Korea, and Taiwan

  14. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  15. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  16. Comparative Study of the Use of Extensible Business Reporting Language (XBRL in Projects for the Supervision of Banking Institutions

    Directory of Open Access Journals (Sweden)

    Myrna Berríos Pagan

    2011-08-01

    Full Text Available The objective of this research is to make a comparative analysis of the use of Extensible Business Reporting Language (XBRL in the projects undertaken for the mandatory filing of banks’ financial information in the United States and the European Union. The agencies overseeing these filing requirements are the Federal Financial Institutions Examination Council (FFIEC and the Committee of European Banking Supervisors (CEBS in the United States and the European Union, respectively. This comparative analysis is made for the following five dimensions: 1 project definition and scope; 2 planned project activities and responsibilities of stakeholders; 3 project management methodology and process; 4 progress monitoring, deadlines, and milestones; and 5 outcomes in terms of project goals and objectives.

  17. Study protocol: Audit and Best Practice for Chronic Disease Extension (ABCDE Project

    Directory of Open Access Journals (Sweden)

    Thompson Sandra

    2008-09-01

    Full Text Available Abstract Background A growing body of international literature points to the importance of a system approach to improve the quality of care in primary health care settings. Continuous Quality Improvement (CQI concepts and techniques provide a theoretically coherent and practical way for primary care organisations to identify, address, and overcome the barriers to improvements. The Audit and Best Practice for Chronic Disease (ABCD study, a CQI-based quality improvement project conducted in Australia's Northern Territory, has demonstrated significant improvements in primary care service systems, in the quality of clinical service delivery and in patient outcomes related to chronic illness care. The aims of the extension phase of this study are to examine factors that influence uptake and sustainability of this type of CQI activity in a variety of Indigenous primary health care organisations in Australia, and to assess the impact of collaborative CQI approaches on prevention and management of chronic illness and health outcomes in Indigenous communities. Methods/design The study will be conducted in 40–50 Indigenous community health centres from 4 States/Territories (Northern Territory, Western Australia, New South Wales and Queensland over a five year period. The project will adopt a participatory, quality improvement approach that features annual cycles of: 1 organisational system assessment and audits of clinical records; 2 feedback to and interpretation of results with participating health centre staff; 3 action planning and goal setting by health centre staff to achieve system changes; and 4 implementation of strategies for change. System assessment will be carried out using a System Assessment Tool and in-depth interviews of key informants. Clinical audit tools include two essential tools that focus on diabetes care audit and preventive service audit, and several optional tools focusing on audits of hypertension, heart disease, renal

  18. Short-Term Contract Work in Adult Education (I) and (II).

    Science.gov (United States)

    Hall, Dorothea; McMath, Patricia

    1986-01-01

    This two-part article discusses short-term project contracts for adult education staff. Part one covers implications of this trend for the service and for the staff involved. Part two looks at short-term contracts from the management viewpoint. (CH)

  19. Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract

    NARCIS (Netherlands)

    Favie, R.; Nordennen, van A.; Kleine, A.J.; Maas, G.J.; Ceric, A.; Radujkovic, M.

    2009-01-01

    In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are

  20. Strategic Inventories in Vertical Contracts

    OpenAIRE

    Krishnan Anand; Ravi Anupindi; Yehuda Bassok

    2008-01-01

    Classical reasons for carrying inventory include fixed (nonlinear) production or procurement costs, lead times, nonstationary or uncertain supply/demand, and capacity constraints. The last decade has seen active research in supply chain coordination focusing on the role of incentive contracts to achieve first-best levels of inventory. An extensive literature in industrial organization that studies incentives for vertical controls largely ignores the effect of inventories. Does the ability to ...

  1. Green Performance Contracting Strategy for Highway Construction Projects

    OpenAIRE

    2014-01-01

    With the growing awareness of sustainability and global climate change, state highway agencies are taking essential steps to reduce carbon emissions from highway infrastructure on a life cycle basis. While much is known regarding climate change mitigation and adaption strategies during highway operation, very little is understood about how climate change issues should be integrated into highway planning, delivery, and construction processes. This paper presents the current contracting pra...

  2. 78 FR 24736 - Energy Savings Performance Contracts: Extension of Comment Period

    Science.gov (United States)

    2013-04-26

    ... Verification (M&V), financing procurement, and definition of risk and responsibilities. More detailed... legislated and executive-ordered energy, greenhouse gas, and water goals. These are delivered through project..., obtaining, and implementing project funding for energy projects through the use of ESPCs. ESPCs allow...

  3. TraceContract

    Science.gov (United States)

    Kavelund, Klaus; Barringer, Howard

    2012-01-01

    TraceContract is an API (Application Programming Interface) for trace analysis. A trace is a sequence of events, and can, for example, be generated by a running program, instrumented appropriately to generate events. An event can be any data object. An example of a trace is a log file containing events that a programmer has found important to record during a program execution. Trace - Contract takes as input such a trace together with a specification formulated using the API and reports on any violations of the specification, potentially calling code (reactions) to be executed when violations are detected. The software is developed as an internal DSL (Domain Specific Language) in the Scala programming language. Scala is a relatively new programming language that is specifically convenient for defining such internal DSLs due to a number of language characteristics. This includes Scala s elegant combination of object-oriented and functional programming, a succinct notation, and an advanced type system. The DSL offers a combination of data-parameterized state machines and temporal logic, which is novel. As an extension of Scala, it is a very expressive and convenient log file analysis framework.

  4. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  5. Australian National University Science Extension Day

    Science.gov (United States)

    Fletcher, Sarah

    2016-01-01

    The first Australian National University (ANU) Science Extension Day was held on September 8, 2015. The ANU Science Extension Day is a project that was initiated by Theodore Primary School (ACT) and developed by Theodore Primary, Calwell High School, Science Educators Association of the ACT (SEA*ACT), and the ANU. The project was developed with a…

  6. Artificial Intelligence Project

    Science.gov (United States)

    1990-01-01

    Symposium on Aritificial Intelligence and Software Engineering Working Notes, March 1989. Blumenthal, Brad, "An Architecture for Automating...Artificial Intelligence Project Final Technical Report ARO Contract: DAAG29-84-K-OGO Artificial Intelligence LaboratO"ry The University of Texas at...Austin N>.. ~ ~ JA 1/I 1991 n~~~ Austin, Texas 78712 ________k A,.tificial Intelligence Project i Final Technical Report ARO Contract: DAAG29-84-K-0060

  7. Erosion Modeling of the High Contraction Chromium Plated Crusader Gun System

    National Research Council Canada - National Science Library

    Sopok, S

    2003-01-01

    Thermal-chemical- mechanical erosion modeling predictions are given for the high contraction chromium plated Crusader gun system based on extensive cannon firing, inspection, characterization, and experimental data...

  8. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  9. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  10. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  12. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  13. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  14. Gear Shifting of Quadriceps during Isometric Knee Extension Disclosed Using Ultrasonography.

    Science.gov (United States)

    Zhang, Shu; Huang, Weijian; Zeng, Yu; Shi, Wenxiu; Diao, Xianfen; Wei, Xiguang; Ling, Shan

    2018-01-01

    Ultrasonography has been widely employed to estimate the morphological changes of muscle during contraction. To further investigate the motion pattern of quadriceps during isometric knee extensions, we studied the relative motion pattern between femur and quadriceps under ultrasonography. An interesting observation is that although the force of isometric knee extension can be controlled to change almost linearly, femur in the simultaneously captured ultrasound video sequences has several different piecewise moving patterns. This phenomenon is like quadriceps having several forward gear ratios like a car starting from rest towards maximal voluntary contraction (MVC) and then returning to rest. Therefore, to verify this assumption, we captured several ultrasound video sequences of isometric knee extension and collected the torque/force signal simultaneously. Then we extract the shapes of femur from these ultrasound video sequences using video processing techniques and study the motion pattern both qualitatively and quantitatively. The phenomenon can be seen easier via a comparison between the torque signal and relative spatial distance between femur and quadriceps. Furthermore, we use cluster analysis techniques to study the process and the clustering results also provided preliminary support to the conclusion that, during both ramp increasing and decreasing phases, quadriceps contraction may have several forward gear ratios relative to femur.

  15. Reorganised force control in elbow pain patients during isometric wrist extension

    DEFF Research Database (Denmark)

    Mista, Christian Ariel; Monterde, Sonia; Inglés, Montserrat

    2018-01-01

    INTRODUCTION: Reorganised force control may be an important adaptation following painful traumas. In this study, force control adaptations were assessed in elbow pain patients. Increasing the contraction demand may overcome pain interference on the motor control and as such act as an internal...... voluntary contraction. Pressure pain thresholds were recorded at the lateral epicondyle and tibialis anterior muscle. Contraction force was recorded using a three-directional force transducer. Participants performed contractions according with visual feedback of the task-related force intensity (main...... direction of wrist extension) and another set of contractions with feedback of the three force directions. Going from the simple to the detailed force feedback will increase the demand of the motor task. Force steadiness in all 3 dimensions and force direction was extracted. RESULTS: Compared with controls...

  16. Collaboration of Extension and Grape Industry Members to Create a New Extension Publication

    Science.gov (United States)

    Stafne, Eric T.; Ingels, George; Ingels, Jane; Carroll, Becky

    2016-01-01

    Collaboration is an important part of the interaction between Extension and industry. Successful sharing of workload can provide benefits for both parties. A project to create a workbook to address vineyard sustainability was initiated by members of the Oklahoma grape industry with assistance from land-grant university Extension. Productive…

  17. The Weyl law for contractive maps

    Science.gov (United States)

    Spina, Maria E.; Rivas, Alejandro M. F.; Carlo, Gabriel

    2013-11-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps.

  18. The Weyl law for contractive maps

    International Nuclear Information System (INIS)

    Spina, Maria E; Rivas, Alejandro M F; Carlo, Gabriel

    2013-01-01

    We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps. (paper)

  19. Context matters in NGO-government contracting for health service delivery: a case study from Pakistan.

    Science.gov (United States)

    Zaidi, Shehla; Mayhew, Susannah H; Cleland, John; Green, Andrew T

    2012-10-01

    Contracting non-governmental organizations (NGOs) for health service provision is gaining increasing importance in low- and middle-income countries. However, the role of the wider context in influencing the effectiveness of contracting is not well studied and is of relevance given that contracting has produced mixed results so far. This paper applies a policy analysis approach to examine the influence of policy and political factors on contracting origin, design and implementation. Evidence is drawn from a country case study of Pakistan involving extensive NGO contracting for human immunodeficiency virus (HIV) prevention services supported by international donor agencies. A multilevel study was conducted using 84 in-depth interviews, 22 semi-structured interviews, document review and direct observation to examine the national policy design, provincial management of contracting and local contract implementation. There were three main findings. First, contracting origin and implementation was an inherently political process affected by the wider policy context. Although in Pakistan a combination of situational events successfully managed to introduce extensive and sophisticated contracting, it ran into difficulties during implementation due to ownership and capacity issues within government. Second, wide-scale contracting was mis-matched with the capacity of local NGOs, which resulted in sub-optimal contract implementation challenging the reliance on market simulation through contracting. Third, we found that contracting can have unintended knock-on effects on both providers and purchasers. As a result of public sector contracts, NGOs became more distanced from their grounded attributes. Effects on government purchasers were more unpredictable, with greater identification with contracting in supportive governance contexts and further distancing in unsupportive contexts. A careful approach is needed in government contracting of NGOs, taking into account acceptance of

  20. Extension properties of states on operator algebras

    Science.gov (United States)

    Hamhalter, Jan

    1995-08-01

    We summarize and deepen some recent results concerning the extension problem for states on operator algebras and general quantum logics. In particular, we establish equivalence between the Gleason extension property, the Hahn-Banach extension property, and the universal state extension property of projection logics. Extensions of Jauch-Piron states are investigated.

  1. Muscle activity during knee-extension strengthening exercise performed with elastic tubing and isotonic resistance

    DEFF Research Database (Denmark)

    Jakobsen, Markus Due; Sundstrup, Emil; Andersen, Christoffer H

    2012-01-01

    muscle during 10-RM knee-extensions performed with elastic tubing and an isotonic strength training machine. METHODS: 7 women and 9 men aged 28-67 years (mean age 44 and 41 years, respectively) participated. Electromyographic (EMG) activity was recorded in 10 muscles during the concentric and eccentric......BACKGROUND/PURPOSE: While elastic resistance training, targeting the upper body is effective for strength training, the effect of elastic resistance training on lower body muscle activity remains questionable. The purpose of this study was to evaluate the EMG-angle relationship of the quadriceps...... tubing induces similar high (>70% nEMG) quadriceps muscle activity during the concentric contraction phase, but slightly lower during the eccentric contraction phase, as knee extensions performed using an isotonic training machine. During the concentric contraction phase the two different conditions...

  2. Muscle activity during knee-extension strengthening exercise performed with elastic tubing and isotonic resistance

    DEFF Research Database (Denmark)

    Jakobsen, Markus Due; Sundstrup, Emil; Andersen, Christoffer H

    2012-01-01

    tubing induces similar high (>70% nEMG) quadriceps muscle activity during the concentric contraction phase, but slightly lower during the eccentric contraction phase, as knee extensions performed using an isotonic training machine. During the concentric contraction phase the two different conditions......BACKGROUND/PURPOSE: While elastic resistance training, targeting the upper body is effective for strength training, the effect of elastic resistance training on lower body muscle activity remains questionable. The purpose of this study was to evaluate the EMG-angle relationship of the quadriceps...... muscle during 10-RM knee-extensions performed with elastic tubing and an isotonic strength training machine. METHODS: 7 women and 9 men aged 28-67 years (mean age 44 and 41 years, respectively) participated. Electromyographic (EMG) activity was recorded in 10 muscles during the concentric and eccentric...

  3. Building Information Modelling and Standardised Construction Contracts: a Content Analysis of the GC21 Contract

    Directory of Open Access Journals (Sweden)

    Aaron Manderson

    2015-08-01

    Full Text Available Building Information Modelling (BIM is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle is yet to occur. One commonly identified barrier to BIM adoption is the perceived legal risks associated with its integration, coupled with the need for implementation in a collaborative environment. Many existing standardised contracts used in the Australian AEC industry were drafted before the emergence of BIM. As BIM continues to become ingrained in the delivery process the shortcomings of these existing contracts have become apparent. This paper reports on a study that reviewed and consolidated the contractual and legal concerns associated with BIM implementation. The findings of the review were used to conduct a qualitative content analysis of the GC21 2nd edition, an Australian standardised construction contract, to identify possible changes to facilitate the implementation of BIM in a collaborative environment. The findings identified a number of changes including the need to adopt a collaborative contract structure with equitable risk and reward mechanisms, recognition of the model as a contract document and the need for standardisation of communication/information exchange.

  4. Legal issues relating to the Ontario FIT contract - An update

    International Nuclear Information System (INIS)

    Weizman, Michael

    2011-01-01

    The paper discusses the legal issues related to the Ontario FIT contract, which includes the FIT waiver agreement, WTO challenge, FIT extension, political risk assessment and issues related to unforeseen events beyond human control (force majeure). The risk of termination of the FIT waiver is omitted for convenience by OPA but timing implications relating to the FIT waiver are included. The binding agreement for supply of generating equipment is also presented and the term sheet for turbine equipment and bill of purchase being understood as binding agreements is questioned. Political risks relate to existing contracts, lawsuit risks and changes to the REA process. Change in government and the implications of minority government can be added to the political risks. A successful WTO challenge has been assumed and the possible implications are discussed. Some of them include risk to FIT contracts already issued; changes in DC requirements and in FIT contract pricing and re-pricing of construction and turbine equipment supply contracts if DC requirements are relaxed.

  5. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  6. Individual and Group Extension Methods: Perspectives from Vi ...

    African Journals Online (AJOL)

    Participatory Rural Appraisals (PRAs) tools including semi-structured questionnaires were administrated to 90 randomly selected farmers who had received extension services from the project. In addition, twelve project extension workers were interviewed. Data were analysed using SPSS computer package and descriptive ...

  7. A Game-Theoretic Model for Distributed Programming by Contract

    DEFF Research Database (Denmark)

    Henriksen, Anders Starcke; Hvitved, Tom; Filinski, Andrzej

    2009-01-01

    We present an extension of the programming-by-contract (PBC) paradigm to a concurrent and distributed environment.  Classical PBC is characterized by absolute conformance of code to its specification, assigning blame in case of failures, and a hierarchical, cooperative decomposition model – none...

  8. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  9. Lessons learned : pavement marking warranty contract.

    Science.gov (United States)

    2013-12-01

    In 2012, UDOT implemented a performance-based warranty on a portion of an I-15 pavement marking : project. The awarded contract requested a contractor warranty on the implemented markings for a total : duration of six years. This is the first time th...

  10. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  11. An Evaluation of the Lower Rio Grande Valley Contracts with Non-VA Providers

    National Research Council Canada - National Science Library

    Piihl, Janet

    1999-01-01

    ... (DRGs with a HCFA average length of stay of three days or less). Surprisingly, four months after the contracts were implemented actual utilization of the contracts was significantly lower than projected...

  12. Isometric Contractions Are More Analgesic Than Isotonic Contractions for Patellar Tendon Pain: An In-Season Randomized Clinical Trial.

    Science.gov (United States)

    Rio, Ebonie; van Ark, Mathijs; Docking, Sean; Moseley, G Lorimer; Kidgell, Dawson; Gaida, Jamie E; van den Akker-Scheek, Inge; Zwerver, Johannes; Cook, Jill

    2017-05-01

    This study aimed to compare the immediate analgesic effects of 2 resistance programs in in-season athletes with patellar tendinopathy (PT). Resistance training is noninvasive, a principle stimulus for corticospinal and neuromuscular adaptation, and may be analgesic. Within-season randomized clinical trial. Data analysis was conducted blinded to group. Subelite volleyball and basketball competitions. Twenty jumping athletes aged more than 16 years, participating in games/trainings 3 times per week with clinically diagnosed PT. Two quadriceps resistance protocols were compared; (1) isometric leg extension holds at 60 degrees knee flexion (80% of their maximal voluntary isometric contraction) or (2) isotonic leg extension (at 80% of their 8 repetition maximum) 4 times per week for 4 weeks. Time under load and rest between sets was matched between groups. (1) Pain (0-10 numerical rating score) during single leg decline squat (SLDS), measured preintervention and postintervention sessions. (2) VISA-P, a questionnaire about tendon pain and function, completed at baseline and after 4 weeks. Twenty athletes with PT (18 men, mean 22.5 ± 4.7 years) participated (isotonic n = 10, isometric n = 10). Baseline median SLDS pain was 5/10 for both groups (isotonic range 1-8, isometric range 2-8). Isometric contractions produced significantly greater immediate analgesia (P < 0.002). Week one analgesic response positively correlated with improvements in VISA-P at 4 weeks (r = 0.64). Both protocols appear efficacious for in-season athletes to reduce pain, however, isometric contractions demonstrated significantly greater immediate analgesia throughout the 4-week trial. Greater analgesia may increase the ability to load or perform.

  13. Analysis of Air Force Wartime Contracted Construction Project Performance

    Science.gov (United States)

    2015-03-26

    KPIs ) identified in current literature. Chan’s meta-analysis of KPIs found that time and cost are the primary objective indicators of a successful...Smith, Currie & Hancock, 2009). 46 Key performance indicators ( KPI ) were also used as input factors to analyze differences between contracts...Chan, et al. (2002) performed a meta-analysis of KPIs , as determined by construction researchers. They found that the most predictive performance

  14. A FRAMEWORK FOR SUBCONTRACTOR INTEGRATION IN ALLIANCE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Vilasini, Nimesha

    2012-04-01

    Full Text Available Project alliancing involves the active collaboration of construction project owners and non-owner participants (designer, contractors, and suppliers to deliver projects in an atmosphere of shared responsibilities and liabilities. Alliancing connotes integration but in real practice, it fails to create a true alliance environment since only part of the value chain (owner, designer, main contractor is considered for integration. Consequently subcontractors are very often left out of the key alliance. Therefore this study identifies improvement areas to current alliance practice and suggests changes that will permit critical sub-contracting processes to be integrated into a project’s main alliance. To achieve this objective the research follows a comparative study approach. Information obtained from relevant literature is used to identify current subcontractor management practices and best practices for subcontractor integration in alliances. A case study of an alliance project is used to identify improvement areas in subcontractor management practices in an alliance environment. From these findings, the study proposes a revised alliance framework that integrates subcontractors from the early stages in alliance contracts, thus enabling the realisation of benefits accruable to projects through early contractor involvement.

  15. Integration of Multiple Contractors with Performance Type of Contracts

    International Nuclear Information System (INIS)

    BURDGE, L.F.

    2000-01-01

    The management practices, procedures, and processes that are suited to managing Management and Operation (MandO) type of contracts at Department of Energy (DOE) sites, which were cost reimbursement with award fee, are not well suited to managing contracts where fee is determined by performance metrics. Thus a different style of management, requiring substantial revamping of the management process, is needed. This shift in philosophy also requires a dramatic shift in culture. This paper will describe how these changes are being managed at the River Protection Project (RPP), located at the DOE's Hanford Site in Washington State, one of DOE's largest and highest risk environmental clean-up project

  16. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  17. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  18. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  19. Information Systems Development Contracts: an exploratory study of Australian legal practitioners' and Information Systems professionals' perceptions

    Directory of Open Access Journals (Sweden)

    Phil Joyce

    2003-05-01

    Full Text Available IS professionals are primarily concerned with the development of a project to meet the goals of a client. Unfortunately, IS professional do not always pay close attention to the contract or to its management and are often unaware of the legal implications of the contracts to which they are assenting. Legal advice can be sought during pre-contractual processes to help ensure that the contract meets the expectations of all the parties. If the project does not meet stakeholder’s expectations, thus causing a contract to come into dispute, lawyers may be called in to review the contract and to seek a settlement. This paper reports an exploratory study of the differences in perceptions of IS development contracts that exist between IS professionals and legal practitioners.

  20. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  1. The PREEV project of the Latin American Forum.Regulatory practices on aging and life extension; El proyecto {sup P}reev del Foro Iberoamericano. Practicas reguladoras en envejecimiento y extension de vida.

    Energy Technology Data Exchange (ETDEWEB)

    Figueras, J. M.

    2011-07-01

    The American Forum Plenary approved in 2008 the PREEV project, Regulatory Practices in Aging and Life Extension, whose main objective is to improve the regulatory action with regard to the management programs of life and long-term operation of nuclear power plants in the countries of the region Latin American.

  2. Good Faith in European Contract Law

    NARCIS (Netherlands)

    Hondius, E.H.

    2002-01-01

    Reinhard Zimmermann and Simon Whittaker, Good Faith in European Contract Law, pp 720, ISBN 0 521 77190 0, Cambridge University Press, Cambridge 2000. This is the first publication resulting from the Trento Common Core of European Private Law project. It analyses the law relating to good faith in

  3. The programs for lifetime extension by AREVA

    International Nuclear Information System (INIS)

    Knoche, P.

    2014-01-01

    In 2011 AREVA launched 2 worldwide programs to meet the demands of its customers: 'AREVA Safety Alliance' that proposes a set of measures for post-Fukushima safety upgrading and 'AREVA Forward Alliance' that is dedicated to lifetime extension projects. Concerning 'AREVA Safety Alliance' about 150 projects have been carried out for 53 customers in 19 countries, as for 'AREVA Forward Alliance' 60% of the lifetime extension projects in the US have been performed by AREVA. In the framework of lifetime extension projects, upgrading measures and services are proposed such as the installation of hydrogen recombiner units, of filtered ventilation systems for severe accidents, or the upgrading of the reactor control system through the implementation of the digital Teleperm XS technology, or recommendations about the methodology to follow for the repair or replacement of important components. The replacement of steam generators and of the pressurizer and with other upgrading works led to a gain of 18.5% on the output power of the Ringhals-4 unit. (A.C.)

  4. Learning to learn with farmers : a case study of an adult learning extension project conducted in Queensland, Australia 1990 - 1995

    NARCIS (Netherlands)

    Hamilton, N.A.

    1995-01-01

    In this thesis, the relationship between the use of participatory processes in the development and use of information and knowledge and their impact on change is described and explored. This research utilises a major extension project carried out with respect to fallow management in

  5. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  6. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  7. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  8. Auditability In The U.S. Navy: A Knowledge Assessment Of The Contracting Workforce

    Science.gov (United States)

    2016-12-01

    contracts, purchasing, management , marketing , quantitative methods or organization and management , a Baccalaureate degree, and one year of contracting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...maximum 200 words) The Department of Defense (DOD) has some problems in its contracting workforce that make the department susceptible to

  9. Project Swiftsure final report: Destruction of chemical agent waste at Defence Research Establishment Suffield. Special publication

    Energy Technology Data Exchange (ETDEWEB)

    McAndless, J.M.

    1994-04-01

    Project Swiftsure describes a three-year project at the Defence Research Establishment Suffield to safely destroy stockpiles of mustard lewisite, nerve agents and decontaminate scrap material which was stored on the DRES Experimental Proving Ground. Using both in-house and contracted resources, the agent waste was destroyed by chemical neutralization or incineration. With the exception of the arsenic byproducts from the lewisite neutralization process, all secondary waste generated by chemical neutralization was incinerated. Mustard in different forms was thermally destroyed using a transportable incinerator of commercial design. Extensive environmental monitoring and public consultation programs were conducted during the project. Results of the monitoring programs verified that the chemical warfare agents were destroyed in a safe, environmentally-responsible manner. jg p.329.

  10. Global LNG - characteristics, clients and contracts

    International Nuclear Information System (INIS)

    Bauquis, P.R.

    1997-01-01

    Total's liquefied natural gas (LNG) holdings were described. Other topics discussed included an overview of gas consumption and internationally traded gas in 1995, a primer on the history of LNG, Japan's average import prices in 1996, Europe's border gas prices and consumption in 1995, Canada/US regional price differences in 1995 and 1996, and world gas markets and prices in 1996. The projected LNG supply and demand in Europe and Asia , especially in Japan, China and India, was also discussed. General concepts of LNG pricing, the general structure of a gas sales contract, and the different categories of LNG contracts were also reviewed. 24 figs

  11. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  12. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  13. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  14. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  15. The Project for the Extension of the Continental Shelf - the Portuguese experience

    Science.gov (United States)

    Madureira, Pedro; Ribeiro, Luísa P.; Roque, Cristina; Henriques, Guida; Brandão, Filipe; Dias, Frederico; Simões, Maria; Neves, Mariana; Conceição, Patricia; Botelho Leal, Isabel; Emepc, Equipa

    2017-04-01

    Under the United Nations Convention on the Law of the Sea (UNCLOS), the continental shelf is a juridical term used to define a submarine area that extends throughout the natural prolongation of a land territory, where the coastal State exercises sovereign rights for the purpose of exploring it and exploiting its natural resources. Article 76 provides a methodology for determining the outer edge of the continental margin and to delineate the outer limits of the continental shelf. The task of preparing the Portuguese submission to the Commission on the Limits of the Continental Shelf was committed to the Task Group for the Extension of the Continental Shelf (EMEPC), which formally began its activity in January 2005. At that time, the existing national capacity to conduct such a task was very limited in its hydrographic, geological and geophysical components. A great effort has been made by Portugal to overcome these weaknesses and develop a strategy to submit the proposal for the extension of the continental shelf beyond 200 nautical miles on 11th May of 2009. The execution of the project involved the implementation of several complementary strategies including: 1) intensive bathymetric, geophysical and, locally, geological data acquisition; 2) acquisition/development of new stand-alone and ship mounted equipment; 3) interactions with universities and research institutes, with emphasis in R&D initiatives; 4) creation of critical mass in deep-sea research by promoting advanced studies on: International Law, Geophysics, Geology, Hydrography, Biology, amongst others; 5) promotion of the sea as a major national goal, coupled with an outreach strategy. Until now, more than 1050 days of surveying have resulted in a large scale seafloor mapping using two EM120 and one EM710 multibeam echosounders from Kongsberg mounted on two hydrographic vessels. The surveys follow IHO Order 2 Standard (SP44, 5th Edition) and cover an area over 2.6 million km2. A multichannel reflection

  16. Mobile contract services: what you need to know.

    Science.gov (United States)

    Inman, M

    2000-01-01

    With sufficient planning and ongoing attention to detail, the performance of a mobile imaging service provider can exceed expectations and requirements. The relationship can prove to be mutually agreeable and profitable for many years. But, when contracting mobile services, you cannot spend too much time on initial research and detail. Several scenarios present outsourcing or mobile services as an acceptable alternative to purchase or lease: outdated equipment, novel or under-utilized technologies, the need for incrementally added or temporary service. To find suitable providers, check with peer sources in your area for recommendations; look specifically for facilities that are comparable in size and volume to your facility. Expect that larger volume facilities will rate more favorable schedules or pricing. Obtain and check references. Require mobile service providers to adhere to the same state and federal laws, rules and regulations that govern your facility; receive the assurance of compliance in writing if it is not specifically addressed in the contract. JCAHO requires that any contract service provider be governed by the same requirements as the accredited facility. Several other rules or licensing requirements may also pertain to mobile services. A prevailing reason for outsourcing imaging services is high equipment costs that cannot be justified with current volume projections. However, equipment quality should not be compromised; it must meet your needs and be in good repair. The mobile service provider you choose should be an extension of your department; quality standards must exist unilaterally. The set rule for assessing mobile service fees is that there is no set rule. There are many ways to negotiate the fee schedule so that it meets the needs of both parties. An effective marketing campaign lets physicians and patients know what you have available. Work with the mobile service provider to plan an initial announcement or open house. The mobile

  17. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  18. Learning Contracts in Undergraduate Courses: Impacts on Student Behaviors and Academic Performance

    Science.gov (United States)

    Frank, Timothy; Scharf, Lauren F. V

    2013-01-01

    This project studied the effect of individualized, voluntary learning contracts for 18 students who performed poorly in the first part of the semester. Contracts were hypothesized to increase commitment and motivation, and lead to changes in behaviors and course performance. Self-reported prioritization and learning-related behaviors (completion…

  19. Latent organizations in the film industry: contracts, rewards and resources

    NARCIS (Netherlands)

    Ebbers, J.J.; Wijnberg, N.M.

    2009-01-01

    The main aim of this article is to study the extent to which the project-based organization (PBO) and the latent organization determine the actual behavior of actors in a project-based industry and how this is mediated by the types of contracts and rewarding practices these organizational forms

  20. MIV Project: Executive Summary

    DEFF Research Database (Denmark)

    Ravazzotti, Mariolina T.; Jørgensen, John Leif; Neefs, Marc

    1997-01-01

    Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing the feasibility of Rendez-vous and docking of unmanned spacecrafts, a reference mission scenario was defined. This report gives an executive summary of the achievements and results from the project.......Under the ESA contract #11453/95/NL/JG(SC), aiming at assessing the feasibility of Rendez-vous and docking of unmanned spacecrafts, a reference mission scenario was defined. This report gives an executive summary of the achievements and results from the project....

  1. INVESTIGATING WHAT ROMANIAN IT RECRUITERS AND EMPLOYEES VALUE WHEN THEY NEGOTIATE EMPLOYMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Anca Maria CLIPA

    2017-12-01

    Full Text Available When negotiating, people have economic as well noneconomic, subjective concerns. This study is an exploratory investigation into the objective and subjective factors influencing employment contract negotiations and the willingness to interact in future business negotiations in the case of Romanian IT employees and recruiters. The study draws on qualitative data collection and analysis methods, i.e. semi-structured interviews with 10 participants, projective techniques and content analysis. At the time, 5 of the participants held recruitment and contracting HR roles, and 5 were working as employees (programmers, business analysts, IT project managers. They all had a recent working contract negotiation experience (less than one year ago in the IT industry. Using the principles of corpus linguistics and the methods specific to discourse and critical discourse analysis, our study highlights some of the factors taken into account by Romanian IT employees and recruiters in employment contract negotiations.

  2. Lessons from the Malawi Agroforestry Extension Project Abstract

    African Journals Online (AJOL)

    User

    The study examined the factors affecting agroforestry technology upscaling and .... This means that farmers whose main source of income is crop sales are .... depended on the performance and commitment of the agricultural extension staff in.

  3. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  4. Umatilla River subbasin fish habitat improvement project. Annual report 1993

    International Nuclear Information System (INIS)

    Bailey, T.D.; Laws, T.S.

    1994-05-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) procurement of one access easement with a private landowner, (2) design, layout, and implementation of 3.36 miles of instream structure maintenance, (3) inspection and routine maintenance of 15.1 miles of fence, (4) revegetation along 3.36 miles of stream, (5) collection and summarization of physical and biological monitoring data, (6) extensive interagency coordination, and (7) environmental education activities with local high school students

  5. Project management best practices: forging win-win partnerships

    International Nuclear Information System (INIS)

    Livet, B.

    2006-01-01

    This paper reviews various aspects of management of renewable energy projects. It outlines contracting strategies, major cost impacts on balance of plants construction and permitting a wind farm project. It concludes by recommending a careful evaluation of the contracting strategy which best fits the circumstances, consideration of site and balance of plant issues in developing a realistic cost model for the project and making an early contact with authorities to ascertain the permitting required for the project

  6. Djeen (Database for Joomla!'s Extensible Engine): a research information management system for flexible multi-technology project administration.

    Science.gov (United States)

    Stahl, Olivier; Duvergey, Hugo; Guille, Arnaud; Blondin, Fanny; Vecchio, Alexandre Del; Finetti, Pascal; Granjeaud, Samuel; Vigy, Oana; Bidaut, Ghislain

    2013-06-06

    With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. We developed Djeen (Database for Joomla!'s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group.Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material.

  7. Proposal for the award of a contract for the maintenance and operation of CERN's sewage installations

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the maintenance and operation of CERN's sewage installations. The Finance Committee is invited to agree to the negotiation of a contract with VALLIER ASSAINISSEMENT (FR), the lowest bidder, for the maintenance and operation of CERN's sewage installations for a period of three years for a total amount of 1 745 897 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period.

  8. Proposal for the award of an industrial support contract for indoor fitting work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for indoor fitting work (carpentry, glazing, venetian and roller blinds) at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm ROLAND COSTA MENUISERIE (CH), the lowest bidder, for the provision of indoor fitting work at CERN, for three years for a total amount not exceeding 1 213 403 Swiss francs, not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  9. Acute effects of a vibration-like stimulus during knee extension exercise.

    Science.gov (United States)

    Mileva, Katya N; Naleem, Asif A; Biswas, Santonu K; Marwood, Simon; Bowtell, Joanna L

    2006-07-01

    This study was conducted to test whether a low-frequency vibration-like stimulus (rapid variable resistance) applied during a single session of knee extension exercise would alter muscle performance. Torque, knee joint angle, EMG activity of rectus femoris (RF) and vastus lateralis (VL) muscles, and VL muscle oxygenation status (near-infrared spectroscopy) were recorded during metronome-guided knee extension exercise. Nine healthy adults completed four trials exercising at contraction intensities of 35% (L) or 70% (H) of one-repetition maximum (1RM) in control (no vibration, Vb-) or vibrated condition (superimposed 10-Hz vibration-like stimulus, Vb+). Maximum voluntary contraction and 1RM were tested pre- and postexercise. During 1RM tests, muscle dynamic strength (P=0.02) and power (P=0.05) were significantly higher during vibrated rather than nonvibrated trials, and strength was significantly higher post- than preexercise (P=0.002), except during LVb- trial. Median spectral frequency of VL and RF EMG activity was significantly higher during postexercise than preexercise 1RM test in the vibration trials but unchanged in the control trials (Pvibration superimposition tended to speed muscle deoxygenation rate (P=0.065, 36% effect size) particularly during L trials. Vibration superimposition during knee extension exercise at low contraction intensity enhanced muscle performance. This effect appears to result from adaptation of neural factors such as motor unit excitability (recruitment and firing frequency, conduction velocity of excitation) in response to sensory receptor stimulation. Muscle vibration may increase the training effects derived from light-to-moderate exercise.

  10. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  11. 49 CFR 633.11 - Covered projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the...

  12. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  13. CONTRACTING OF FOREIGNERS DURING LAUNCHING THE PROJECT OF COLONISTS’RESETTLEMENT TO RUSSIA (1760s

    Directory of Open Access Journals (Sweden)

    О К Ермакова

    2017-12-01

    Full Text Available The article presents a comparative analysis of different kinds of contracts concluded du-ring the resettlement of foreign colonists to Russia in the 1760s. The agreements are classi-fi ed and characterized in terms of form, structure of content and composition of counterparts. The content of the contracts is correlated with the legislative norms as well as with other sourc-es, which infl uenced the creation of such a kind of document. The paper studies the agreements with different subcategories of foreign colonists: manufacturers, recruiters (“vyzyvateli”, plowmen. The author demonstrates the process of the rights and obligations establishment in the contracts as well as how the working-out and discussion of conditions were conducted, fi nally - in what degree the foreigners could infl uence the results. If, for example, the foreign specialists, who were hired to the Russian service temporarily, had more chances to change and improve the terms of contracts, in the case of foreign colonists, the latter ones more often just had to accept the conditions offered by the government. The author concludes that the agreements with manufacturers in many ways were similar to those with hired foreign specialists; contracts with “vyzyvateli” were the most unifi ed and, with rare exceptions, strictly corre-sponded to the form determined by the law. The paper reveals the specifi cs of the content of contracts, in particular, chapters concern-ing the subject of agreement (the main task of a foreigner was to cultivate land, to organize a factory or to attract colonists-farmers, obligation of transferring knowledge and experience to Russian pupils, fi nancial issues, conditions of trade, possibilities of leaving Russia and ac-tions in the case of foreigner’s death.The author shows the involvement of agreements with colonists in the general develop-ment of contractual relationships between the state and foreigners as members of the Russian

  14. Extending Security-by-Contract with Quantitative Trust on Mobile Devices

    DEFF Research Database (Denmark)

    Costa, Gabriele; Dragoni, Nicola; Lazouski, Aliaksandr

    2010-01-01

    program our architecture updates the trust level associated with the contract provider. We also present a possible application of our framework in the scenario of a mobile application marketplace, e.g., Apple AppStore, Cydia, Android Market, that, nowadays, are considered as one of the most attractive e......Security-by-Contract (S×C) is a paradigm providing security assurances for mobile applications. In this work, we present the an extension of S×C, called Security-by-Contract-with-Trust (S×C×T). Indeed, we enrich the S×C architecture by integrating a trust model and adding new modules......-commerce activity for both mobile application developers and industries of mobile devices. Since the number of applications increases, Mobile Applications Marketplace (MAMp) sets up recommendation systems that rank and highlight mobile applications by category, social activity, etc. The S×C×T framework we propose...

  15. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  16. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  17. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  18. Managing the relational character of public-private partnership contracts

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2015-01-01

    Full Text Available A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration. Considering the methodology of managing relational contracts, it is essential that the theory of relational contracts does not advocate for the establishment of relational contracts as a separate category of contracts, with specifically designated contractual instruments. This theory defines the relational contract as a category which legitimizes 'the relational mode' of a particular contract. The methodology of relational contracts is important for contracts on public-private partnership as it ensures that the contractual relationship is aligned with the changes in the immediate environment where the PPP contract operates. The aforementioned alignment has two aspects. The first one is the ex ante aspect of the alignment which is primarily aimed at preventing the detrimental effect of such alignment to the public partner's interests. Therefore, the intent to prevent such an effect shall be taken into account when defining the criteria for the selection of the most favorable private partner and the best offer. At the same time, it is essential to establish verifiable standards for measuring the private partner performance in the phase of contract implementation. For this goal to be achieved, it is crucial to specify the subject matter of the private partner's obligations, to establish the priority rank of PPP project objectives, to elaborate on the specific requirements governing the eligibility of private partners to participate in the bidding process, to specify

  19. Proposal for the award of an industrial support contract for minor civil-engineering work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor civil-engineering work at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm LOSINGER CONSTRUCTION (CH), the lowest bidder, for the provision of minor civilengineering work at CERN for three years for a total amount not exceeding 2 840 278 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  20. Effect of Privatisation of Agricultural Extension Services on ...

    African Journals Online (AJOL)

    User

    Department of Agricultural Extension and Rural Development, University of ... services of Fadama III project on farmers' productivity in Oyo state, ... Production of poultry meat (r = 0.389, p<0.05) and eggs ... extension staff in non-extension duties; low private sector participation; weak ... Privatization is to enhance efficiency.

  1. Variability of Measurement of Patellofemoral Indices with Knee Flexion and Quadriceps Contraction: An MRI-Based Anatomical Study

    Science.gov (United States)

    Laugharne, Edward; Bali, Navi; Purushothamdas, Sanjay; Almallah, Faris; Kundra, Rik

    2016-01-01

    Purpose The purpose of this study was to investigate the impact of varying knee flexion and quadriceps activity on patellofemoral indices measured on magnetic resonance imaging (MRI). Materials and Methods MRI of the knee was performed in 20 patients for indications other than patellar or patellofemoral pathology. Axial and sagittal sequences were performed in full extension of the knee with the quadriceps relaxed, full extension of the knee with the quadriceps contracted, 30° flexion of the knee with the quadriceps relaxed, and 30° flexion with the quadriceps contracted. Bisect offset, patella tilt angle, Insall-Salvati ratio and Caton-Deschamps index were measured. Results With the knee flexed to 30° and quadriceps relaxed, the mean values of patellar tilt angle, bisect offset, Insall-Salvati ratio and Caton-Deschamps index were all within normal limits. With the knee extended and quadriceps contracted, the mean patellar tilt angle (normal value, patellofemoral indices. MRI taken with the knee in 30° of flexion allows more reliable assessment of the patellofemoral joint and minimises the confounding effect of quadriceps contraction. PMID:27894177

  2. The Danish Contracting System

    DEFF Research Database (Denmark)

    Bonke, Sten; Levring, Peter

    The paper is mainly concerned with the institutional framework of the Danish construction industry, describing structures, rules and actors' roles within a perspective of nationally defined procedural guidelines on construction projects. These aspects are treated under the concept of a "contracting...... system". After a short introduction to the structure and activities of the industry the post-war development is reviewed, in particular emphasising the importance of the early industrialisation process which in an international perspective represents quite unique features. Furthermore the most recent...

  3. Small farmers and agricultural extension : surviving on a small farm in the Netherlands and possibilities for agricultural extension to reach a hard-to-reach category

    NARCIS (Netherlands)

    Somers, B.M.

    1991-01-01

    This dissertation reports the results of the research project "Employment in Agriculture and Extension". Primary aims of the project were: a) to identify categories of farmers who are homogeneous in their survival strategies and b) to indicate ways agricultural extension could help farmers

  4. Influence of silicon concentration on linear contraction process of Al-Si binary alloy

    Directory of Open Access Journals (Sweden)

    J. Mutwil

    2008-12-01

    Full Text Available Investigations of shrinkage phenomena during solidification and cooling of aluminium and aluminium-silicon alloys (AlSi5, AlSi7, AlSi9, AlSi11, AlSi12.5, AlSi18, AlSi21 have been conducted. A vertical shrinkage rod casting with circular cross-section (constant or fixed: tapered has been used as a test sample. By constant cross-section a test channel mould was parted and allowed a constrained contraction to examine. No parted test channel mould was tapered and allowed an unconstrained contraction to investigate. In the experiments the dimensions changes of solidifying test bar and the test mould have been registered, what has allowed to explain a mechanism of pre-shrinkage extension of solidifying metals and alloys. Registered time dependence of the test bar and the test mould dimension changes have shown, that so-called pre-shrinkage extension has been by mould thermal extension caused. The investigation results have also shown that time- and temperature dependences of shrinkage of Al-Si alloys have been on silicon concentration depended.

  5. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  6. Choreographies and Behavioural Contracts on the Way to Dynamic Updates

    Directory of Open Access Journals (Sweden)

    Mario Bravetti

    2014-11-01

    Full Text Available We survey our work on choreographies and behavioural contracts in multiparty interactions. In particular theories of behavioural contracts are presented which enable reasoning about correct service composition (contract compliance and service substitutability (contract refinement preorder under different assumptions concerning service communication: synchronous address or name based communication with patient non-preemptable or impatient invocations, or asynchronous communication. Correspondingly relations between behavioural contracts and choreographic descriptions are considered, where a contract for each communicating party is, e.g., derived by projection. The considered relations are induced as the maximal preoders which preserve contract compliance and global traces: we show maximality to hold (permitting services to be discovered/substituted independently for each party when contract refinement preorders with all the above asymmetric communication means are considered and, instead, not to hold if the standard symmetric CCS/pi-calculus communication is considered (or when directly relating choreographies to behavioral contracts via a preorder, no matter the communication mean. The obtained maximal preorders are then characterized in terms of a new form of testing, called compliance testing, where not only tests must succeed but also the system under test (thus relating to controllability theory, and compared with classical preorders such as may/must testing, trace inclusion, etc. Finally, recent work about adaptable choreographies and behavioural contracts is presented, where the theory above is extended to update mechanisms allowing choreographies/contracts to be modified at run-time by internal (self-adaptation or external intervention.

  7. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  8. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  9. Alternative windpower ownership structures: Financing terms and project costs

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.; Kahn, E.

    1996-05-01

    Most utility-scale renewable energy projects in the United States are developed and financed by private renewable energy companies. Electric output is then sold to investor-owned and public utilities under long-term contracts. Limited partnerships, sale/leaseback arrangements, and project-financing have historically been the dominant forms of finance in the windpower industry, with project-finance taking the lead more recently. Although private ownership using project-finance is still the most popular form of windpower development, alternative approaches to ownership and financing are becoming more prevalent. U.S. public and investor-owned electric utilities (IOUs) have begun to participate directly in windpower projects by owning and financing their own facilities rather than purchasing windpower from independent non-utility generators (NUGs) through power purchase agreements (PPAs). In these utility-ownership arrangements, the wind turbine equipment vendor/developer typically designs and constructs a project under a turnkey contract for the eventual project owner (the utility). The utility will also frequently sign an operations and maintenance (O&M) contract with the project developer/equipment vendor. There appear to be a number of reasons for utility involvement in recent and planned U.S. wind projects. One important claim is that utility ownership and self-finance provides substantial cost savings compared to contracting with private NUGs to supply wind-generated power. In this report, we examine that assertion.

  10. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  11. A Collection of JPME Operational Contract Support Case Studies and Vignettes

    Science.gov (United States)

    2016-12-01

    Contracting for goods and services in the contingency operational environment is a mission-enabling necessity; however, analyzing the strategic effects...choosing to contract for goods or services are largely ignored. This project explores the use of OCS in contingency environments, and the positive and...think of the costs literally, as tax dollars spent to enhance mission effectiveness. However, the less literal costs and the associated effects of

  12. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  13. Role of participants in nuclear power projects

    International Nuclear Information System (INIS)

    Polliart, A.J.

    1977-01-01

    In this article staffing requirements for nuclear projects (Turnkey Contract) and the owner's staff requirements, project planning, project implementation, and plant construction and commissioning are treated. (HK) [de

  14. Voluntary low-force contraction elicits prolonged low-frequency fatigue and changes in surface electromyography and mechanomyography

    DEFF Research Database (Denmark)

    Blangsted, Anne Katrine; Sjøgaard, Gisela; Madeleine, Pascal

    2005-01-01

    Controversies exist regarding objective documentation of fatigue development with low-force contractions. We hypothesized that non-exhaustive, low-force muscle contraction may induce prolonged low-frequency fatigue (LFF) that in the subsequent recovery period is detectable by electromyography (EMG......) and in particular mechanomyography (MMG) during low-force rather than high-force test contractions. Seven subjects performed static wrist extension at 10% maximal voluntary contraction (MVC) for 10 min (10%MVC10 min). Wrist force response to electrical stimulation of extensor carpi radialis muscle (ECR) quantified...... LFF. EMG and MMG were recorded from ECR during static test contractions at 5% and 80% MVC. Electrical stimulation, MVC, and test contractions were performed before 10%MVC10 min and at 10, 30, 90 and 150 min recovery. In spite of no changes in MVC, LFF persisted up to 150 min recovery but did...

  15. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  16. Debt Contracts, Collapse and Regulation as Competition Phenomena

    NARCIS (Netherlands)

    Gersbach, H.; Uhlig, H.F.H.V.S.

    1998-01-01

    We study a credit market with adverse selection and moral hazard where sufficient sorting is impossible. The crucial novel feature is the competition between lenders in their choice of contracts offered. Qualities of investment projects are not observable by banks and investment decisions of

  17. Full Lambek Calculus with Contraction is Undecidable

    Czech Academy of Sciences Publication Activity Database

    Chvalovský, Karel; Horčík, Rostislav

    2016-01-01

    Roč. 81, č. 2 (2016), s. 524-540 ISSN 0022-4812 R&D Projects: GA ČR GAP202/11/1632 Institutional support: RVO:67985807 Keywords : substructural logic * full Lambek calculus * contraction rule * square-increasing residuated lattice * equational theory * decidability Subject RIV: BA - General Mathematics Impact factor: 0.511, year: 2016

  18. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  19. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  20. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  1. Enrolling Advisers in Governing Privatised Agricultural Extension in Australia: Challenges and Opportunities for the Research, Development and Extension System

    Science.gov (United States)

    Paschen, Jana-Axinja; Reichelt, Nicole; King, Barbara; Ayre, Margaret; Nettle, Ruth

    2017-01-01

    Purpose: Current developments in the Australian agricultural research, development and extension (RD&E) system exemplify the complex governance challenges arising from the international privatisation of agricultural extension. Presenting early challenges emerging from a multi-stakeholder project aimed at stimulating the role of the private…

  2. Policy for equipment’s leasing period extension with minimum cost of maintenance

    Science.gov (United States)

    Lestari, C.; Kurniati, N.

    2018-04-01

    The cost structure for equipment investment including purchase cost and maintenance cost is getting more expensive. The company considers to lease the equipment instead of purchase it under a contractual agreement. Offering to extend the lease period, following to the base lease period, will provide more benefits for both the lessor (owner) and the lessee (user). Whenever the lease period extension offered at the beginning of the contract, there are some risks in finance e.g. uncertainty of the equipment performance and lessor responsibility. Therefore, this research attempts to model the optimal maintenance policy for lease period extension offered at the end of the contract. Minimal repair is performed to rectify a failed equipment, while imperfect preventive maintenance is conducted to improve the operational state of the equipment when reaches a certain control limit to avoid failures. The mathematical model is constructed to determine the optimal control limit, the number and degree of preventive maintenance, and the multiplication number of the lease period extension. Finally, numerical examples are given to illustrate the influences of the optimal length of the extended lease and the maintenance policy to minimize the maintenance cost.

  3. Incorporating Non-energy Benefits into Energy Savings Performance Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter; Goldman, Charles; Gilligan, Donald; Singer, Terry

    2012-06-01

    This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers use to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.

  4. Djeen (Database for Joomla!’s Extensible Engine): a research information management system for flexible multi-technology project administration

    Science.gov (United States)

    2013-01-01

    Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665

  5. 24 CFR 236.755 - Housing owner's obligation under contract to report tenant income increase.

    Science.gov (United States)

    2010-04-01

    ... FOR RENTAL PROJECTS Rental Assistance Payments § 236.755 Housing owner's obligation under contract to... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Housing owner's obligation under contract to report tenant income increase. 236.755 Section 236.755 Housing and Urban Development...

  6. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  7. PERFORMANCE OF THE EXTENSION PROJECT “WE GO TO SUCKLE, MOTHER”, IN THE YEAR OF 2006

    Directory of Open Access Journals (Sweden)

    Fabrícia Calheira Primo Paiva

    2007-08-01

    Full Text Available The Extension Project “Let’s go to breastfeed, mother?” it comes acting since 1993 with the objective to stimulate the breastfeeding in the jequieense community and surrounding cities, aims the reduction of the infantile mortality and morbidity. In this study, we search to tell the activities that had been developed by the related project in 2006. This is a documental research of quantitative nature. It had as scene the Basic Health Care Units and the rooming-in unit of a public hospital. The sampling consisted of 500 pregnant women and 1.195 woman in postpartum registered in cadastre in these units. The results shows the accomplishment of 98 informative lectures in the Basic Health Care Units; 290 in the rooming-in unit; 124 household visits; distributed 1.195 educative folders; orientation of three scientific research approaching the thematic; participation in the Breastfeeding World-wide Week; accomplishment of 24 meeting of the group of study; cadastre of woman in postpartum in the rooming-in unit; accomplishment of 3 workshops; participation in 1 meeting of the Integrated Group of Incentive to Breastfeeding in Salvador city. We understand that the cited project comes giving your contribution to the spreading, incentive and promotion to the breastfeeding, constituting a project of social relevance because awaking in the academic community and extra-academic the necessity and the importance of the practical of the breastfeeding.

  8. Performance of the extension project “we go to suckle, mother”, in the year of 2006

    Directory of Open Access Journals (Sweden)

    Zulmerinda Meira Oliveira

    2007-01-01

    Full Text Available The Extension Project “Let’s go to breastfeed, mother?” it comes acting since 1993 with the objective to stimulate the breastfeeding in the jequieense community and surrounding cities, aims the reduction of the infantile mortality and morbidity. In this study, we search to tell the activities that had been developed by the related project in 2006. This is a documental research of quantitative nature. It had as scene the Basic Health Care Units and the rooming-in unit of a public hospital. The sampling consisted of 500 pregnant women and 1.195 woman in postpartum registered in cadastre in these units. The results shows the accomplishment of 98 informative lectures in the Basic Health Care Units; 290 in the rooming-in unit; 124 household visits; distributed 1.195 educative folders; orientation of three scientific research approaching the thematic; participation in the Breastfeeding World-wide Week; accomplishment of 24 meeting of the group of study; cadastre of woman in postpartum in the rooming-in unit; accomplishment of 3 workshops; participation in 1 meeting of the Integrated Group of Incentive to Breastfeeding in Salvador city. We understand that the cited project comes giving your contribution to the spreading, incentive and promotion to the breastfeeding, constituting a project of social relevance because awaking in the academic community and extra-academic the necessity and the importance of the practical of the breastfeeding.

  9. Getting added value from the supply contract

    International Nuclear Information System (INIS)

    Heslop, Peter

    1999-01-01

    The linking of energy saving measures with the competitive supply of energy is examined, and the impact of digital metering on the electricity market, the roles of energy surveys and monitoring and targeting, and the unwillingness to invest in energy efficiency are discussed. Combined heat and power projects, and energy supply contracts are considered. (uk)

  10. Proposal for the award of three contracts for the provision of temporary labour on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the CERN site. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the CERN site with CREYF'S (CH), VEDIOR (CH), and ALPEMPLOI (CH) for a total combined maximum amount for three years for all three contracts of 12 000 000 Swiss francs, not subject to revision, for an initial period of three years from 1 July 2006. The contracts will include options for two further one-year extensions beyond the initial three-year period. 2006/62/5/e

  11. Participation of INR to the research project initiated by the CANDU Owners Group - Canada

    International Nuclear Information System (INIS)

    Roth, Maria; Ciocanescu, Marin; Gheorghiu, C-tin; Ohai, Dumitru; Visinescu, Doru; Ionescu, Silviu; Man, Ion; Pitigoi, Vasile; Anghel, Dumitru; Uta, Octavian

    2004-01-01

    Having in view the participation of the INR's Nuclear Materials and Corrosion Departments together with Chalk River Laboratories, AECL, and other nine well known institutes, to the Research Project coordinated by the International Atomic Energy Agency - Vienna and the results obtained as well, the CANDU Owners Group (COG) - Canada has proposed an economical contract to INR - Pitesti, called the DHC Project. The goal of this project was the investigation of the slow cracking in the hydration state (Delayed Hydride Cracking phenomenon) of the pressure tubes in CANDU reactors. There were determined, in specific conditions, the DHC rate, V DHC , and threshold factor of triggering the phenomenon K HI (the factor of stress intensity in the crack) occurring in un-irradiated Zr-2.5%Nb alloy. Further extensions of the project to irradiated alloys of the pressure tubes used in CANDU reactors, provided by the Canadian partner, are planned. This paper gives an overview covering the contributions of the INR's departments to the contract provisions for the current year as concluded with COG - Canada. It is described the design and execution activity of a device for processing the samples subject to testing, the mounting of the measuring chain, developing of a system for monitoring the testing parameters, the acquisition and automated processing of experimental data up to constituting the final report. The testing report was appreciated by the COG and recognized as demonstrating the INR's capability to fulfil the tasks of the DHC Project and so opened the way to further cooperation

  12. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  13. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  14. 5 CFR 890.401 - Temporary extension of coverage and conversion.

    Science.gov (United States)

    2010-01-01

    ... exercise the right of conversion provided for by this part. The 31-day extension of coverage and the right... benefits with respect to that person while he or she is entitled to any inpatient benefits under the prior... Program contract on the day after the day all inpatient benefits have been exhausted under the prior plan...

  15. 1970-1971 Annual Report: Extension Service Program, Silliman University.

    Science.gov (United States)

    Maturan, Eulalio G.

    The 1970-1971 annual report of the Extension Service Program of Silliman University, Dumaguete City, Philippines, treats the following projects: Mabinay Agricultural Extension, Mabinay Negrito Action-Research, Reforestation, and Livestock Dispersal. Also discussed are the Rural Publications Center and other extension services--a radio program,…

  16. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  17. 5 CFR 1315.14 - Payments under construction contracts.

    Science.gov (United States)

    2010-01-01

    ... the contract; (ii) Payments to subcontractors and suppliers have been made from previous payments... withhold or retain from a subcontractor or supplier, in accordance with the terms and conditions of their..., increments, or segments of any project) that is approved as payable by the agency pursuant to paragraph (b...

  18. 公共项目伙伴合作契约的治理机制与责任主体找寻%Governance Mechanism of Public Projects Partnership Contract and Obligation Principal Persuing

    Institute of Scientific and Technical Information of China (English)

    后小仙

    2011-01-01

    在公共项目代建模式下,形成了一条以代理人为纽带的委托代理链。代理人问题的存在会影响公共项目管理效率,解决问题的关键在于设计一套激励相容的契约。对基于伙伴合作契约的公共项目内部治理机制的研究表明,伙伴合作契约将有效均衡合作各方内部的权利和义务,通过有限介入管理和决策,减少交易的不确定性和信息的不对称性;伙伴合作契约中的风险分担机制、利益分配机制、信任沟通机制以及冲突协调机制等是提高公共项目内部治理效率的基础和保障。%Under the agent construction system of public project,there is an agents chain which takes the agent units as the link. The problem of agency brings about the low efficiency of the public projects management. The key of the solving way lies in designing an incentive compatible contract. The analysis on the inner governance mechanisms of public projects based on the partnership contract, shows that partnership contract will effectively balance the rights and obligations of cooperation parties. Significantly reduce the uncertainty and information asymmetry of transaction by management and decision of limited intervention. The mechanisms of risk-sharing, benefits distribution, trust communication and conflict coordination in the partnership contract is the foundation to improve the efficiency of public projects Inner governance.

  19. Financing of wind energy projects

    International Nuclear Information System (INIS)

    Harland, S.

    1991-01-01

    This paper looks at what banks need to know to enable them to consider a wind energy project. The major experiences of banks in financing wind energy have been in the US where governmentally inspired long term sales contracts (PURPA Contracts) have given a security to sponsors and banks not available elsewhere. (Author)

  20. Long-term allocation of power from the Snettisham Project

    International Nuclear Information System (INIS)

    1993-01-01

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan

  1. Behavioural contracting as a tool to help patients achieve better health.

    Science.gov (United States)

    Neale, A V

    1991-12-01

    Behavioural contracting is an intervention technique in which a client signs an agreement to make certain behaviour changes within a specified time, usually with explicitly defined rewards for adherence or success. Contracting is being increasingly used by health professionals to assist patients in making beneficial life style changes. This paper presents data on the outcome of behavioural contracting interventions to lower serum cholesterol and to increase exercise activity. Of 223 primary care patients enrolled in a health promotion programme, 179 met with the project health educator to improve their cardiovascular risk profile; 144 of these were classified as having 'high cholesterol' and 51 signed contracts to adopt the American Heart Association guidelines diet within a 3-month period. Everyone was encouraged to sign a contract to engage in aerobic exercise three times per week; 96 did so. The results indicate that contractors achieved greater beneficial health changes than non-contractors, and that the group which fully met their contract obligations experienced the greatest health benefit of all (either a lowering of cholesterol or a decreased exercising heart rate).

  2. Neutron-Induced Fission Cross Section of Uranium, Americium and Curium Isotopes. Progress report - Research Contract 14485, Coordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Alekseev, A.A.; Bergman, A.A.; Berlev, A.I.; Koptelov, E.A.; Samylin, B.F.; Trufanov, A.M.; Fursov, B.I.; Shorin, V.S.

    2009-12-01

    This report contains brief description of the Lead Slowing Down Spectrometer and results of measurements of neutron-induced fission cross sections for 236 U, 242m Am, 243 Cm, 244 Cm, 245 Cm and 246 Cm done at this spectrometer. The work was partially supported through the IAEA research contract RC-14485-RD in the framework of the IAEA Coordinated Research Project 'Minor Actinide Neutron Reaction Data (MANREAD)'. The detailed description of the experimental set up, measurements procedure and data treatment can be found in the JIA-1182 (2007) and JIA-1212 (2009) reports from the Institute of Nuclear Research of the Russian Academy of Science published in Russian. Part 1 contains the first year report of the research contract and part 2 the second year report. (author)

  3. Proposal to increase the amount of an existing contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2003-01-01

    This document concerns the proposal to increase the authorized amount of an existing contract for the provision of a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet Exchange in Chicago, USA. The extension will be negotiated by CERN on behalf of its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through the University of Victoria (Canada), the World Health Organization (WHO) in Geneva and the European Union funded DataTAG project. The Finance Committee is invited to approve the increase of the authorized amount of the existing contract with T-SYSTEMS INTERNATIONAL (DE) for the provision of a high-speed data circuit for an additional amount of 1 731 106 euros (2 596 660 Swiss francs), bringing the total authorized limit to 5 821 000 Swiss francs, not subject to revision. The amount in Swiss francs has...

  4. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  5. Investigations of linear contraction and shrinkage stresses development in hypereutectic al-si binary alloys

    Directory of Open Access Journals (Sweden)

    J. Mutwil

    2009-07-01

    Full Text Available Shrinkage phenomena during solidification and cooling of hypereutectic aluminium-silicon alloys (AlSi18, AlSi21 have been examined. A vertical shrinkage rod casting with circular cross-section (constant or fixed: tapered has been used as a test sample. Two type of experiments have been conducted: 1 on development of the test sample linear dimension changes (linear expansion/contraction, 2 on development of shrinkage stresses in the test sample. By the linear contraction experiments the linear dimension changes of the test sample and the metal test mould as well a temperature in six points of the test sample have been registered. By shrinkage stresses examination a shrinkage tension force and linear dimension changes of the test sample as well a temperature in three points of the test sample have been registered. Registered time dependences of the test bar and the test mould linear dimension changes have shown, that so-called pre-shrinkage extension has been mainly by mould thermal extension caused. The investigation results have shown that both: the linear contraction as well as the shrinkage stresses development are evident dependent on metal temperature in a warmest region the sample (thermal centre.

  6. Technical report on the project for improving the JAEA's enterprise resource planning system

    International Nuclear Information System (INIS)

    Kimura, Hideo; Aoyagi, Tetsuo; Sato, Taiichi; Sakai, Manabu; Suzuki, Hitoshi; Tsuji, Minoru; Hikasa, Naoki

    2011-09-01

    The financial accounting and contract management system of JAEA, built on a commercial ERP package, had suffered from serious problems of high lifecycle cost, poor response, and lack of extensibility, due to the too much customization to the ERP package, and disorganized software structure. To solve those problems, three approaches were applied; 1) conducting thorough analysis of business flow and fit/gap under the cooperation of users and system engineers, which enabled removing all customization brought to the ERP package; 2) dividing the system into subsystems each of which corresponds to a business unit, and clearly defining interfaces between the subsystems with international standards, which increases the transparency, extensibility and performance of the system; 3) outsourcing the development of the subsystems to multiple venders to reduce the development cost and controlling the risk of multiple outsourcing with a project management method used successfully in the very large R and D project in JAEA for developing JT60, a fusion plasma research facility. Those approaches can be useful for developing business information systems using commercial software to save time and cost, while meeting the unique requirements of an organization. (author)

  7. Negative extensibility metamaterials: Occurrence and design-space topology

    Science.gov (United States)

    Karpov, Eduard G.; Danso, Larry A.; Klein, John T.

    2017-08-01

    A negative extensibility material structure pulls back and contracts when the external tensile load reaches a certain critical level. In this paper, we reveal basic mathematical features of the nonlinear strain energy function responsible for this unusual mechanical property. A systematic discussion leads to a comprehensive phase diagram in terms of design parameters for a simple unit cell structure that provides a panoramic view of all possible nonlinear mechanical behaviors. A negative extensibility region clearly is identified in the diagram. The sought property is seen to be rare, occurring only for a very narrow range of the design parameters. Nonetheless, due to the simplicity of the studied structure we suggest that the negative extensibility should be a more common phenomenon than previously thought. It can appear in simple bistable cells made of only several linearly elastic links, although at some peculiar combinations of their properties. These bistable unit cells can be used to design periodic mechanical metamaterials whose examples are shown as well as innovative architectural metastructures.

  8. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  9. Analisys of IT outsourcing contracts at the TCU (Federal Court of Accounts and of the legislation that governs these contracts in the Brazilian Federal Public administration

    Directory of Open Access Journals (Sweden)

    Graziela Ferreira Guarda

    2015-09-01

    Full Text Available Information technology (IT outsourcing has for a long time been a major trend in business and government. Accountability of IT outsourcing contracts in the public administration is recognized as an important factor contributing to government transparency and public services quality, given the legislation governing these contracts and the amount of related expenditures. Considering the trend towards open government data publishing, including data on outsourcing contracts, there is an interesting opportunity for citizens to participate in the open auditing of these contracts as a means to assess the good application of public resources. In this study we explore this possibility by analyzing open data published by the Brazilian Federal Court of Accounts (TCU is its acronym in Portuguese, an interesting case since this agency has a paramount role in auditing the whole Brazilian Federal Public Administration. To this end, we gathered open data from the TCU regarding all outsourced IT services contracts maintained by the agency during the years 2000-2013. This data is analyzed to verify, from an external point of view, the related duration and values, identifying diferences between the predicted and actual amounts spent and evaluating the administration of such contracts regarding legislation. This analysis is based on a detailed survey of the relevant legislation as well as the verification of original contract terms and their addendums. As a result, we observed substantial differences in the amount spent on execution with respect to those predicted in the original contracts. Also, we identified the utilization of special justifications prescribed by law to sustain the extension of some contracts. Given these results, it is possible that IT outsourcing is not necessarily proved to be the best solution for the public sector problems regarding the lack of skilled personnel, which implies the need to assess the cost-benefit of maintaining these

  10. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  11. Governing Collaborative New Product Development : Toward a Configurational Perspective on the Role of Contracts

    NARCIS (Netherlands)

    Hofman, Erwin; Faems, Dries; Schleimer, Stephanie C.

    2017-01-01

    This study inductively explores the interplay among different contractual functions and their impact on project performance in collaborative new product development (NPD) projects. Applying a configurational perspective, contracts are conceptualized as bundles of different functions. In line with

  12. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  13. Extensive Reading in Enhancing Lexical Chunks Acquisition

    Science.gov (United States)

    Pereyra, Nilsa

    2015-01-01

    The purpose of this action research was to investigate the effect of extensive reading and related activities on the acquisition of lexical chunks in EFL students. Seven adult EFL learners with an Intermediate level volunteered to take part in the 16 week project following Extensive Reading principles combined with tasks based on the Lexical…

  14. 24 CFR 888.320 - One-time Contract Rent determination.

    Science.gov (United States)

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND... Elderly or Handicapped, and Special Allocations Projects § 888.320 One-time Contract Rent determination...

  15. Contractive function systems, their attractors and metrization

    Czech Academy of Sciences Publication Activity Database

    Banakh, T.; Kubiś, Wieslaw; Novosad, N.; Nowak, M.; Strobin, F.

    2015-01-01

    Roč. 46, č. 2 (2015), s. 1029-1066 ISSN 1230-3429 R&D Projects: GA ČR(CZ) GA14-07880S Institutional support: RVO:67985840 Keywords : fractal * attractor * iterated function system * contracting function system Subject RIV: BA - General Mathematics Impact factor: 0.717, year: 2015 http://www.apcz.pl/czasopisma/index.php/TMNA/article/view/TMNA.2015.076

  16. Nuclear Fusion Project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-12-01

    Short communications give a survey of 38 technology tasks, the development of ECRH power sources at 150 GHz, and 8 NET study contracts. The fusion technology contracts and the NET contracts are listed in the appendices I and II, respectively, while the KfK departments contributing to the Fusion Project and the Fusion Project Management Staff are listed in appendices III and IV, respectively. (GG)

  17. Contribution of research and development and engineering to a large reprocessing plant project. Extension of the La Hague plant

    International Nuclear Information System (INIS)

    Boutaud de la Combe, P.; Courouble, J.M.; Sauteron, J.; Redon, A.

    1983-01-01

    Two reprocessing plants are operated by Cogema: Marcoule (since 1958) and La Hague (since 1967). Since 1976 the latter has been reprocessing LWR assemblies in its 'HAO' workshop, operation of which has provided industrial experience in the reprocessing of this type of fuel. This experience will be drawn upon in the construction of extensions to the La Hague plant, namely the UP3 plant, which will have a capacity of 800 t/a, and UP2-800, which will expand the present plant likewise to a capacity of 800 t/a. These extensions will contain a number of improvements, particularly in the areas of safety and waste treatment, and of procedure and equipment. A considerable R and D contribution is provided by the French Atomic Energy Commission (CEA), which is the licence holder, with its laboratories at Fontenay and the pilot workshop and industrial prototypes service at Marcoule. This activity supports all phases of the project, from the establishment of basic principles to the definition of essential characteristics of equipment, covering also the testing of full-scale prototypes (mock-ups) for the principal components: rotating continuous dissolver, swinging decanter, subcritical pulsed columns, used-solvent distilling apparatus, fission-product vitrification furnace, etc. Engineering work for the new facilities is performed by the Societe generale pour les techniques nouvelles in four phases: (1) establishment of basic data; (2) preparation of preliminary plans (including an estimate and a preliminary schedule) and of the preliminary safety reports; (3) drafting of the 'project' file, giving definitive costs and deadlines; (4) implementation, up to and including the operational testing stage. All phases of design and implementation are subject to a quality assurance programme. Extension of the La Hague plant represents an investment of 23,500 million French francs (in July 1981). Construction is expected to be completed in 1989. (author)

  18. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  19. Challenges for extension service to render efficient post-transformer ...

    African Journals Online (AJOL)

    LPhidza

    Key words: Participation, participants, perception, agricultural projects, Extension Officers. 1. INTRODUCTION ... participation of farmers or project participants and other role players is critical to the success and sustainability of ..... respondent categories indicated a financial reason for participating. A project needs to be a.

  20. Proposal for the award of an industrial services contract for computer centre operations

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for Computer Centre operations. Following a market survey carried out among 40 firms in eleven Member States, a call for tenders (IT-2871/IT) was sent on 9 March 2001 to nine firms and one consortium consisting of two firms in six Member States. By the closing date, CERN had received three tenders from two firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DCS (CH) - INTRASOFT (GR), the lowest bidder, for an initial period of three years from 1 October 2001 for a total amount of 2 196 588 Swiss francs, not subject to revision until 30 September 2002. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-55% ; GR-45%.

  1. Bid process and contracting for remediation in New Mexico

    International Nuclear Information System (INIS)

    Fox, K.

    1994-01-01

    In an effort to provide cost effective and timely reclamation services to high priority leaking underground storage tank sites the New Mexico Environment Department has implemented a reclamation bidding process for qualified state contractors. The bid process was implemented in an attempt to make reclamation contractors more competitive and to encourage innovative technologies and contracting mechanisms. Overall the Bureau has received positive feedback from contractors participating in the process, especially regarding innovative technology and contracting. In addition, the process has provided excellent training for project managers and has allowed a critical review of the reclamation process for UST sites in general

  2. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  3. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  4. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  5. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  6. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  7. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  8. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  9. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  10. On the contraction factors of long-chain branched macromolecules

    Czech Academy of Sciences Publication Activity Database

    Kratochvíl, Pavel; Netopilík, Miloš

    2014-01-01

    Roč. 51, February (2014), s. 177-181 ISSN 0014-3057 R&D Projects: GA ČR GCP205/11/J043 Institutional support: RVO:61389013 Keywords : long- chain branching * contraction factor * radius of gyration Subject RIV: CD - Macromolecular Chemistry Impact factor: 3.005, year: 2014

  11. Proposal for the award of an industrial support contract for operation of the Computer Centre at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for operation of the Computer Centre at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DATA CONVERSION SYSTEMS (CH) - INTRACOM BULGARIA (BG), the lowest bidder, for the operation of the Computer Centre at CERN for a period of three years for a total amount not exceeding 2 046 570 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period. 2006/55/5/e

  12. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  13. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  14. Extension as expression of social responsibility for higher education

    Directory of Open Access Journals (Sweden)

    Ricardo Antonio de Marco

    2016-05-01

    Full Text Available The National System of Higher Education Assessment 2004 in Axis 2, Institutional Development and its dimensions 1 and 3: Mission and Institutional Development Plan (IDP and the Social Responsibility of the institution highlights the need for universities to incorporate in their activities teaching, research and extension practices that demonstrate their positive involvement in social development. In this sense, this article aims to evaluate the practice of university extension contributes to the consolidation of University Social Responsibility. was used as a method descriptive research and documentary analysis found that the institutional documents of the University of the West of Santa Catarina: mission, vision and values; Institutional Development Plan and the extension project of the University of Chapecó Best Age (UMIC; and the National System of Higher Education Evaluation. From this inference, it was revealed that UNOESC in its constitutive principles and official documents value-oriented civic education for social inclusion. It was found that the consolidation of MSW necessarily involves watchful eye of management to the principles of indivisibility of teaching, research and extension, components and ended the universities, which when not properly executed, counter and violate the legal provision; that inter- and transdisciplinary nature of extension projects, such as UMIC, have strong contribution to the consolidation of MSW; parallel, left clear that isolation Extension projects like UMIC not reach the fullness of the social commitment of universities, suggesting that inseparability is present with the incorporation of actions that promote social development.

  15. 7 CFR 632.18 - Special projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Special projects. 632.18 Section 632.18 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Qualifications § 632.18 Special projects. (a) The NRCS State conservationist may approve the following types of special projects subject to the...

  16. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  17. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  18. Incomplete Contract and Divisional Structures

    OpenAIRE

    Bao, T.; Wang, Y.

    2009-01-01

    In this paper we want to analyze the internal divisional structure within an organi- zation in the framework of incomplete contract theory. We use the framework of Aghion and Tirole (1997) and define the managerial control structure as \\sequence of search". A key feature of this paper which differentiate it from other works in the literature is that we add add an ex post bargaining phase in which the managers can agree on the project which maximize their joint private benefit. Our model shows...

  19. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    Science.gov (United States)

    1984-05-23

    1981, the Navy awarded a cost reimbursable contract to a joint venture to construct facility projects for fiscal years 1981 and 1982 with an estimated...through fiscal year 1986. In July 1981, the Navy awarded a cost reimburs - able contract (cost plus award fee) to Raymond, Brown & Root, Molem, a joint...Navy’s oversight and management of the acquisition of these facilities. A COST REIMBURSABLE CONTRACT MAKES STRONG CONTRACT ADMINISTRATION VITAL Under

  20. Proposal for the award of a contract, without competitive tendering, for the maintenance of low-voltage switchgear

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of low-voltage switchgear. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of low-voltage switchgear with HAZEMEYER (FR) for a total amount of 385 000 euros (610 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  1. Nuclear fusion project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-05-01

    This semi-annual report gives 36 short descriptions of the work done in the framework of the Nuclear Fusion Project and outlines studies for NET/INTOR and for ECRH power sources at 150 GHz. Tables of fusion technology contracts, of NET contracts, of KfK departments contributing to the Fusion Project, and of the Fusion Project management staff complete this report. (GG)

  2. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  3. Professional services contract manager development and certification strategy : spr 696 : final report.

    Science.gov (United States)

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  4. Ensuring the adequacy of cost share provisions in superfund state contracts. Directive

    International Nuclear Information System (INIS)

    1993-01-01

    The memorandum requests regional offices to re-examine existing Superfund State Contracts (SSCs) for Fund-financed remedial actions to verify that they adequately reflect incurred and projected remedial action costs

  5. Hydraulic analysis and optimization design in Guri rehabilitation project

    Science.gov (United States)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  6. Extension agents\\' marketing related services: The relevance to ...

    African Journals Online (AJOL)

    This study investigated the marketing related services provided to farmers by extension agents in Osun State, Nigeria. Data were collected from the extension agents in the services of Osun State Agricultural Development Projects, which is the government outfit to provide such services to farmers on one hand and their ...

  7. Proposal for the award of an industrial support contract for paintwork, false ceilings, plasterwork and false floors at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for paintwork, false ceilings, plasterwork and false floors at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm PREZIOSO (FR), the lowest bidder, for the provision of paintwork, false ceilings, plasterwork and false floors at CERN for a period of three years for a total amount not exceeding 538 419 euros (830 381 Swiss francs), not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial threeyear period.

  8. Proposal for the award of an industrial support contract for minor metalwork, metal fittings, cladding and roofing at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor metalwork, metal fittings, cladding and roofing at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm INIZIATIVE INDUSTRIALI SRL (IT), the lowest bidder, for the provision of minor metalwork, metal fittings, cladding and roofing at CERN for three years for a total amount not exceeding 1 467 895 euros (2 258 301 Swiss francs), not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  9. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  10. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  11. Problems with the implementation of bus transport contracting in South Africa

    Directory of Open Access Journals (Sweden)

    Jackie Walters

    2012-11-01

    Full Text Available South Africa has had a policy of competitive tendering for the provision of public transport services (subsidised commuter bus services since the mid-1980s. Although this policy approach was conceptualised by the previous government, prior to the transfer of political power in 1994, it was reaffirmed in a 1996 White Paper on National Transport Policy. Despite the nearly 25 years that have passed since the intention to tender services, only about 32% of the subsidy budget is currently spent on some form of contracting. The majority of services are still operated on authorisations (interim contracts which formalised services that operators were operating pre-1994. The purpose of this paper is to analyse the reasons why public transport contracting policy progress has been so slow in South Africa. The paper relies on an extensive study that was conducted regarding policy implementation obstacles in general, as well as a questionnaire survey among the subsidised commuter bus operators to solicit their views on the reasons for the delay in the implementation of the contracting system in the country. The findings of the survey indicate that the major issues hindering the implementation of the contracting system are to be found in a lack of funding, lack of capacity to implement policy and major operational issues in the permit offices.

  12. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  13. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  14. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    International Nuclear Information System (INIS)

    Kosonen, M.; Hakola, M.

    2012-01-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the

  15. Effect of Knee Joint Angle and Contraction Intensity on Hamstrings Coactivation.

    Science.gov (United States)

    Wu, Rui; Delahunt, Eamonn; Ditroilo, Massimiliano; Lowery, Madeleine M; DE Vito, Giuseppe

    2017-08-01

    This study investigated the effect of knee joint angle and contraction intensity on the coactivation of the hamstring muscles (when acting as antagonists to the quadriceps) in young and older individuals of both sexes. A total of 25 young (24 ± 2.6 yr) and 26 older (70 ± 2.5 yr) healthy men and women participated. Maximal voluntary isometric contraction of the knee extensors and flexors was assessed at two knee joint angles (90° and 60°, 0° = full extension). At each angle, participants performed submaximal contractions of the knee extensors (20%, 50%, and 80% maximal voluntary isometric contraction), whereas surface EMG was simultaneously acquired from the vastus lateralis and biceps femoris muscles to assess the level (EMG root-mean-square) of agonist activation and antagonist coactivation. Subcutaneous adipose tissue in the areas corresponding to surface EMG electrode placements was measured via ultrasonography. The contractions performed at 90° knee flexion demonstrated higher levels of antagonist coactivation (all P < 0.01) and agonist activation (all P < 0.01) as a function of contraction intensity compared with the 60° knee flexion. Furthermore, after controlling for subcutaneous adipose tissue, older participants exhibited a higher level of antagonist coactivation at 60° knee flexion compared with young participants (P < 0.05). The results of the present study suggest that 1) the antagonist coactivation is dependent on knee joint angle and contraction intensity and 2) subcutaneous adipose tissue may affect the measured coactivation level likely because of a cross-talk effect. Antagonist coactivation may play a protective role in stabilizing the knee joint and maintaining constant motor output.

  16. Research on Risk Evaluation of Transnational Power Networking Projects Based on the Matter-Element Extension Theory and Granular Computing

    Directory of Open Access Journals (Sweden)

    Jinying Li

    2017-10-01

    Full Text Available In project management, risk assessment is crucial for stakeholders to identify the risk factors during the whole life cycle of the project. A risk evaluation index system of a transnational networking project, which provides an effective way for the grid integration of clean electricity and the sustainable development of the power industry, is constructed in this paper. Meanwhile, a combination of granular computing and order relation analysis (G1 method is applied to determine the weight of each indicator and the matter-element extension evaluation model is also employed to seek the global optimal decision during the risk assessment. Finally, a case study is given to validate the index system and evaluation model established in this paper by assessing two different investment schemes of a transnational high voltage direct current (HVDC transmission project. The result shows that the comprehensive risk level of Scheme 1 is “Low” and the level of Scheme 2 is “General”, which means Scheme 1 is better for the stakeholders from the angle of risk control. The main practical significance of this paper lies in that it can provide a reference and decision support for the government’s power sectors, investment companies and other stakeholders when carrying out related activities.

  17. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  18. Project approach helps technology transfer

    International Nuclear Information System (INIS)

    Walcher, M.W.

    1982-01-01

    The placing of the contract by the National Power Corporation with Westinghouse for the Philippines nuclear power plant (PNPP-1) is described. Maximised use of Philippine contractors under Westinghouse supervision was provided for. Technology transfer is an important benefit of the contract arrangements, since National Power Corporation project management acquires considerable nuclear plant experience during plant construction through consultation with technical personnel. (U.K.)

  19. Is the jury still out on PFI contracts?

    Science.gov (United States)

    Baillie, Jonathan

    2012-02-01

    Last September Andrew Lansley claimed that some NHS Trusts occupying PFI healthcare facilities had been 'landed with deals they could not afford', seemingly attributing much of the blame for a scenario where the Department of Health said 22 Trusts in England alone could be at significant financial risk to Labour, which, in the 1990s, greatly expanded a public/private funding partnership originally introduced by the Tories a decade earlier. Two key factors critics claim have put such Trusts 'at risk' are the 'inflexibility' of some PFI contracts, which makes varying terms difficult mid-contract, and the fact that many of the earlier deals were inexpertly negotiated by the 'public sector side'. HEJ editor Jonathan Baillie sought the views of Malcolm Austwick, a partner at top commercial law firm, DAC Beachcroft (see panel below), with extensive experience in the legal complexities of PFI, on whether or not the initiative's 'pros' do indeed outweigh the 'cons'.

  20. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ..., and any other applicable water-related contracts. 7. Identify the organizational structure planned for... Fryingpan-Arkansas Project (Fry-Ark Project), Colorado AGENCY: Bureau of Reclamation, Interior. ACTION... at Pueblo Dam River Outlet of the Fry-Ark Project, Colorado. Reclamation is considering such...

  1. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    the technical and contractual requirements of the project. A project manager with extensive experience in major defence projects has been contracted and a team of technical and contracts specialists has now completed documentation which has been issued as a Request for Tender to four pre-qualified reactor vendors. The four vendors were selected as a result of a worldwide invitation in mid 1998 for expressions of interest. The tender process is a 'two envelope' system whereby the tenderers are required to submit in one envelope the technical and contractual details of their bid whilst submitting the pricing details in the other envelope. Tenders close on 3 January 2000. A contract is expected to be agreed by mid 2000 with commissioning completed during 2005

  2. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  3. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  4. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  5. Proposal for the award of a contract for software support services for industrial control systems

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for software support services for industrial control systems, including maintenance of existing systems and development of new applications. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEMS (FR) - INBIS (GB), the lowest bidder, for software support services for industrial control systems, including maintenance of existing systems and development of new applications, for a period of three years for a total amount not exceeding 1 281 057 euros (1 998 530 Swiss francs), not subject to revision for the first two years. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period.

  6. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  7. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  8. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  9. Interdependence of torque, joint angle, angular velocity and muscle action during human multi-joint leg extension.

    Science.gov (United States)

    Hahn, Daniel; Herzog, Walter; Schwirtz, Ansgar

    2014-08-01

    Force and torque production of human muscles depends upon their lengths and contraction velocity. However, these factors are widely assumed to be independent of each other and the few studies that dealt with interactions of torque, angle and angular velocity are based on isolated single-joint movements. Thus, the purpose of this study was to determine force/torque-angle and force/torque-angular velocity properties for multi-joint leg extensions. Human leg extension was investigated (n = 18) on a motor-driven leg press dynamometer while measuring external reaction forces at the feet. Extensor torque in the knee joint was calculated using inverse dynamics. Isometric contractions were performed at eight joint angle configurations of the lower limb corresponding to increments of 10° at the knee from 30 to 100° of knee flexion. Concentric and eccentric contractions were performed over the same range of motion at mean angular velocities of the knee from 30 to 240° s(-1). For contractions of increasing velocity, optimum knee angle shifted from 52 ± 7 to 64 ± 4° knee flexion. Furthermore, the curvature of the concentric force/torque-angular velocity relations varied with joint angles and maximum angular velocities increased from 866 ± 79 to 1,238 ± 132° s(-1) for 90-50° knee flexion. Normalised eccentric forces/torques ranged from 0.85 ± 0.12 to 1.32 ± 0.16 of their isometric reference, only showing significant increases above isometric and an effect of angular velocity for joint angles greater than optimum knee angle. The findings reveal that force/torque production during multi-joint leg extension depends on the combined effects of angle and angular velocity. This finding should be accounted for in modelling and optimisation of human movement.

  10. An Analysis of Category Management of Service Contracts

    Science.gov (United States)

    2017-12-01

    comprised of four steps to guide future category management teams in analyzing data and applying Category Management principles through the use of...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT AN ANALYSIS OF CATEGORY MANAGEMENT OF SERVICE CONTRACTS December 2017...Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project

  11. Proposal for the award of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems with MGE (FR) for a total amount of 575 000 euros (911 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  12. Oxygenation and EMG in the proximal and distal vastus lateralis during submaximal isometric knee extension

    DEFF Research Database (Denmark)

    Crenshaw, Albert G.; Bronee, Lars; Krag, Ida

    2010-01-01

    /or (2) fatigue development. Nine males performed 2-min sustained isometric knee extensions at 15% and 30% maximum voluntary contraction during which oxygenation and EMG were recorded simultaneously from proximal and distal locations of the vastus lateralis muscle. Near infrared spectroscopy variables...

  13. Improved projects execution and contract strategies. The Hyde experience

    International Nuclear Information System (INIS)

    Murphy, D.L.

    1993-01-01

    The conference paper deals with the obtained experience from the Hyde development project on the UK continental shelf. The industry is searching for more effective ways to develop North Sea oil and gas assets. Hyde, like many other projects, was uneconomic using current industry development and operation norms. BP, as a results, challenged its management to change the norms and achieve new levels of performance. The Hyde field was discovered in 1967. At that time, and until late 1991, it was assessed non-commercial. Between discovery and late 1991, gas prices increased in real terms but not as much as capital and operating costs. The initial BP challenge for Hyde was to make it commercial. The paper discusses the sanction phase, the mould breaking, and the project development breakthrough. 2 figs

  14. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  15. Qinshan phase II extension nuclear power project thermal stratification and fatigue stress analysis for pressurizer surge line

    International Nuclear Information System (INIS)

    Yu Xiaofei; Zhang Yixiong; Ai Honglei

    2010-01-01

    Thermal stratification of pressurizer surge line induced by the inside fluid brings on global bending moments, local thermal stresses, unexpected displacements and support loadings of the pipe system. In order to avoid a costly three-dimensional computation, a combined 1D/2D technique has been developed and implemented to analyze the thermal stratification and fatigue stress of pressurize surge line of QINSHAN Phase II Extension Nuclear Power Project in this paper, using the computer codes SYSTUS and ROCOCO. According to the mechanical analysis results of stratification, the maximum stress and cumulative usage factor, the loadings at connections of surge line to main pipe and RCP and the displacements of surge line at supports are obtained. (authors)

  16. 7 CFR 1484.35 - Must Cooperators follow specific contracting procedures?

    Science.gov (United States)

    2010-01-01

    ... the decision-making process. [64 FR 52630, Sept. 30, 1999. Redesignated and amended at 65 FR 9995, Feb...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS PROGRAMS TO..., which are reimbursed with project funds, are documented by a purchase order, invoice, or contract; (2...

  17. [Contract learning: effects of professionalization on the student nurse].

    Science.gov (United States)

    Jubin, Patricia

    2013-03-01

    The reengineering of nurse training implies the implementation of self-development, empowering tools and a reshaping of the function of accompaniment during training which becomes a shared function. This work is part of a psycho-socio-educational approach of the accompaniment to self-directed learning and also in the field of practices of health and social work. This study contributes to the identification of the conditions of efficiency of contracting between student nurses, tutors and instructors. It aims to explore the interest of a triangular steering of the learning contract centered on the student's individual project and also the interest of meetings during training as triggers to a process of self-construction of competences. Moreover, the study aims to identify the effects of contract on professionalization. Our study reverts to the basic question of learning by contract as a pillar for the self-directed learning in an alternating training context. The empirical approach takes into account a qualitative study carried out with 15 people (tutors, managers, student nurses and instructors) in 3 health care structures and a quantitative study based on 78 first year students, 106 second year students, and 47 third year students at the same nursing education institute. The study shows that learning by contract is empowering and professionalizing, if the student is placed in favorable conditions of learning and contractual relationship.

  18. Economic viability of Cernavoda project

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.; Chirica, T.; Glodeanu, F.

    1998-01-01

    Cernavoda project started in 1978, when the CANDU technology procurement contract and other contracts for engineering, technical assistance and procurement were signed with AECL. The works on site started in 1980. In February 1981, a contract was signed with GE - USA and Ansaldo - Italy for balance of plant. After 1989 the concept for project implementation was essentially changed. The completion of Cernavoda NPP Unit-1, established as the first priority by Romanian authorities was implemented by AECL-Ansaldo Consortium (AAC). The objective of the contract signed with AAC consisted in overtaking the management of Cernavoda Unit-1 project, in order to complete, commission and operate the plant for 18 months. The plant was successfully completed, commissioned and commercially operated since December 2, 1996. As concerns Unit-2, only preservation and some remedial works were performed since 1991. In order to support the decision to complete Unit-2, a complete process was initiated: - identification of the activities and associated costs required for plan completion; - plant integration in the utility's least cost development study; - Unit-2 cash flow analysis. A joint RENEL-AECL-ANSALDO team performed a detailed analysis using Cernavoda Unit-1 as reference project and taking advantage of the experience gained during construction, commissioning and operation of the first unit. The least cost power generation development study finalized by SEP and EDF, based on a PHARE funding, ranked Cernavoda Unit-2 on the second place, after two small hydroelectric plants of 53 and 8 Mw e. A cash flow model developed by a RENEL-ANSALDO joint team shows that Cernavoda Unit-2 is an economically feasible project. The financing scenario provides that all resources will be from loans. Other arguments for completion of Cernavoda Unit-2 are: - good performances in operation of Unit-1; - the need to provide jobs for the specialists in the nuclear field; - opportunity for electricity export

  19. Proposal for the award of two contracts for the provision of mechanical design and draughting services on and off the CERN Site

    CERN Document Server

    2006-01-01

    This document concerns the award of two contracts for the provision of mechanical design and draughting services on and off the CERN site. The Finance Committee is invited to agree to the negotiation of two contracts with: 1. ACROTECNA (FR), the lowest bidder, for approximately 55% of the provision of mechanical design and draughting services on and off the CERN site, for a period of three years for a total amount not exceeding 794 200 euros (1 239 006 Swiss francs), not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The rate of exchange used is that stipulated in the tender. 2. TECNICAS AERONAUTICAS MADRID (ES), the joint lowest bidder after alignment, for approximately 45% of the provision of mechanical design and draughting services on and off the CERN site, for a period of three years for a total amount not exceeding 1 013 730 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond...

  20. Venture financing of start-ups: A model of contract between VC fund and entrepreneur

    Directory of Open Access Journals (Sweden)

    Osintsev Yury

    2010-01-01

    Full Text Available Venture capital has become one of the main sources of innovation in the modern, global economy. It is not just a substitute for bank loans: it has proven to be a more efficient way of financing projects at different stages. On one hand, venture financing allows for projects with higher risk, which leads to the possibility of higher returns on investment. On the other hand, venture investors who usually have managerial experience often participate in governing the business, which certainly adds value to the enterprise. In this paper we establish the model of contract between the venture capital fund and the entrepreneur, focusing on probably the most important issue of this contract: the shares of the parties in the business. The shares in the company determine the distribution of the joint surplus. The expected joint profits are not just exogenously specified in the contract but are dependent on the behavioral variables of both parties at the stage of fulfilling the contract. We call the behavioral variable of the entrepreneur ‘effort’ and the one of the venture fund ‘advice’. The probability of the project’s success, and hence the expected joint revenues, are increased by these two. However, both kinds of effort are costly to the respective parties that have made them. Based on this fact we can elaborate the profit functions of both sides of the contract. Our model can be considered as a basis for specifying contracts concerning venture financing. It can provide the logic for how the equilibrium shares of entrepreneur and venture fund are obtained.

  1. Financing the energy renovation of public buildings through Internal Contracting. Infinite Solutions Guidebook

    International Nuclear Information System (INIS)

    Schilken, Peter; Turner, Ian; Kuehnbach, Matthias; Simic, Ivan; Kuharic, Boris; Laranjeira, Celia; Rodrigues, Carlos; Couceiro, Carla; Presotto, Agnese; Mazzeschi, Alessandro; Cleto, Joao

    2017-02-01

    Meeting the European energy and climate policy objectives will require the mobilisation of substantial energy efficiency and renewable energy investments at the local level. Given both the substantial effort necessary to finance the energy transition and restricted municipal budgets, it is clear that these objectives cannot be met through traditional public financing such as grants or direct investment, but by finding a new approach to financing solutions. This Energy Cities guidebook is built upon a comprehensive analysis of Stuttgart's Internal Contracting scheme and a detailed questioning of it by the learning authorities within the INFINITE Solutions project. It is intended to offer guidelines to municipalities as well as universities, hospitals or other institutions interested in applying Internal Contracting to improve their energy consumption and efficiency performance. The approach of this guidebook is developed as follows: The concept of contracting - especially Internal Contracting - is introduced. Universal guidance is offered on how to implement an Internal Contracting scheme and keep it working over the long term. The Internal Contracting scheme is presented in practice. Several cities describe their individual approaches to Internal Contracting and the various ways they have been able to adapt the scheme

  2. Basic Conditions of Validity of Electronic Contracts in Iran and UNCITRAL Model Law

    Directory of Open Access Journals (Sweden)

    Abbas Karimi

    2017-02-01

    Full Text Available Diverse activities such as electronic exchange of goods and services, instant digital content delivery, electronic funds transfer, electronic stock exchange, electronic bill of lading, commercial projects, common engineering and design, sourcing, government purchase, direct marketing and post-sales services included in e-commerce field.  Due to the increasing spread of the electronic world in all aspects, electronic contracts, in turn, was of great importance and made significant contributions in business contracts. The present study aims to investigate the concept, fundamentals and history of electronic contracts referring to UNCITRAL Model Law on Electronic Commerce and Electronic Commerce Act (1996. The results indicate that in terms of the conclusion and obligations of the parties, contract in cyberspace in general is similar to the contract in the real world and in this respect, there is no major difference between these two contexts. Potential electronic contracts considered as written ones and Electronic signatures recognized as valid as the basis of the validity of the will in electronic trading.

  3. Relationship of moderate and low isometric lumbar extension through architectural and muscular activity variables: a cross sectional study

    International Nuclear Information System (INIS)

    Cuesta-Vargas, Antonio I; Gonzalez-Sanchez, Manuel

    2013-01-01

    No study relating the changes obtained in the architecture of erector spinae (ES) muscle were registered with ultrasound and different intensities of muscle contraction recorded by surface EMG (electromyography) on the ES muscle was found. The aim of this study was analyse the relationship in the response of the ES muscle during isometric moderate and light lumbar isometric extension considering architecture and functional muscle variables. Cross-sectional study. 46 subjects (52% men) with a group mean age of 30.4 (±7.78). The participants developed isometric lumbar extension while performing moderate and low isometric trunk and hip extension in a sitting position with hips flexed 90 degrees and the lumbar spine in neutral position. During these measurements, electromyography recordings and ultrasound images were taken bilaterally. Bilaterally pennation angle, muscle thickness, torque and muscle activation were measured. This study was developed at the human movement analysis laboratory of the Health Science Faculty of the University of Malaga (Spain). Strong and moderate correlations were found at moderate and low intensities contraction between the variable of the same intensity, with correlation values ranging from 0.726 (Torque Moderate – EMG Left Moderate) to 0.923 (Angle Left Light – Angle Right Light) (p < 0.001). This correlation is observed between the variables that describe the same intensity of contraction, showing a poor correlation between variables of different intensities. There is a strong relationship between architecture and function variables of ES muscle when describe an isometric lumbar extension at light or moderate intensity

  4. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  5. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  6. Power plant construction contracting in a changing regulatory environment

    International Nuclear Information System (INIS)

    Person, J.C.

    1993-01-01

    The 1965 blackout in the Northeast provided the wake-up call that spawned in unprecedented program of power plant construction by electric utilities. This building program began in the late 1960s and continued unabated through the 1970s. Beginning in the late 1970s, state regulators began in era of 'prudence' reviews which disallowed as imprudent significant portions of the costs of certain nuclear units being brought on line at the time. This regulatory experience brought about a fundamental change in the way in which utilities evaluated the need for additional capacity. This paper explores construction contracting trends in light of recent developments in the relationship between the electric utility and the state regulator. It is within this context that the utility decides: (1) whether to build, buy, or save; and (2) if the decision is to build, which project planning and administration considerations will maximize the utility's ability to incorporate project costs into the ratebase. In order to put these issues into their proper perspective, this paper first presents a brief overview of the prudence decisions of the past, and the chilling effect of these decisions generally on new project planning. The paper next focuses on the recent changes to the post-construction prudence review model, including the introduction of pre-approval arrangements and rolling prudence reviews. Following that will be a survey of new construction spending decisions in light of these changes. After an analysis of the bases for the prudence disallowances of the past and the application of the lessons learned from these disallowances to contract planning and administration issues of today, the paper will close with a discussion of the relative advantages and disadvantages of the most commonly used contract delivery methods in today's regulatory environment

  7. DSN Aperture Enhancement Project Office

    Science.gov (United States)

    Marina, Miguel

    2012-01-01

    All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

  8. Public bus service and the concession contract in Andalusia. Effect of transmission

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Portales, S.; Maeso Gonzalez, E.

    2016-07-01

    The Andalusian sector of regular public passenger transport of general use, has beentraditionally characterized by being configured by a wide variety of operators of small andmedium-scale, where the concession contracts were the only and main economic activity.Over time, new trends have appeared on the market that have led to the evolution of thesector to other models. On the one hand, transformation of the business owner tocorporations, and secondly the penetration of large multinational companies which haveentered the sector through the acquisition and, on many occasions, absorbing existingconcession companies.This paper analyzes the changes experienced in the concession contracts related to theirchange of ownership and its impact on the current structure industry. The analysis showsan overview of the regular public transport system travelers utility road in Andalusia.The results are interesting for the planning and design of new concession contracts,extension approach of the current contracts and general optimization of the system forpromotion of a sustainable transport, which satisfies needs of users, respecting the rule offree market.In short, this paper aims to provide a deeper knowledge of the sector, from the point ofview of the operating companies that intergrates it, showing the evolution in existingbusiness structures. (Author)

  9. RODOS User's Group: Final project report. Contract number: F14P- CT98-0075

    International Nuclear Information System (INIS)

    Sinkko, K.; Ammann, M.

    2001-03-01

    Prior to 1998, the development of RODOS, a decision support system designed for the management of nuclear emergencies, had been carried out almost entirely by research scientists and engineers. The end-users/operators had little or no input into this development. To redress this situation, the RODOS Users Group (RUG) was established in 1998 under a Concerted Action Contract between the European Commission and STUK. The main objectives of this group were to encourage the emergency management community to use such a system, to provide a forum for end-users to share their experience in the use of such systems and to provide feedback from the end-users to the model and system developers in regard to operational problems and required improvements. The contract, which commenced on 1st September 1998, was for a period of two years. During this period, RUG established a www homepage, planned and performed two nuclear accident exercises and held four meetings. Technically the Web page operated very well. State-of-the-art Internet technology provided an efficient communication channel at low cost. The membership of the RUG was, however, too low to maintain a lively and ongoing discussion in parallel with the RODOS project Web page. This experience would suggest that it might have been better to have operated a Web page for RUG on the RODOS project Web-site rather than an independent RUG Web-site. Exercises based on fixed accident scenarios proved to be an appropriate means of highlighting issues that needed to be discussed between users and developers and to stimulate and motivate the end-users to maintain and further develop the system. Such exercises also promoted further activity in the field of emergency management. The organisation and administration of realistic exercises are time consuming, laborious and expensive. It is therefore very important that the maximum benefit is achieved from such exercises. The use of analytical evaluation methods could be better employed

  10. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  11. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  12. THE ANALYSIS OF ORGANIC RICE CONTRACT FARMING IN CAMBODIA: A LESSON LEARNED FOR INDONESIA

    Directory of Open Access Journals (Sweden)

    Betti Rosita Sari

    2015-12-01

    Full Text Available  This study examines organic rice contract farming inCambodiaand its impact on farmers’ livelihood. The study’s objective is to gain a better insight of the terms and conditions of rice contract farming scheme inCambodia, and determine under what conditions contract farming could bring improvements to farmers’ livelihoods. This study contributes new research findings on contract farming practices and farmers’ livelihood due to organic-rice contract farming with a case study in Kampong Speu province,Cambodia.Rice contract farming is not widespread inCambodiaat present, but is expected to expand significantly in the near future. Contract farming can increase investment into agricultural and infrastructure in rural areas. Contract farming can also enable farmers to access credit, inputs, technical advice and information about market condition and pricing trends. Yet, the disadvantages of contract farming include loss of farmer bargaining power and a potential reduction in profit margins, increased emphasis on improving production quality, land consolidation in favor of participating contract farmers, and less secure livelihoods.In this study, the contract farming arrangements of Angkor Kasekam Rongroeung (AKR Company is studied. A survey of 16 contract farmers and 20 non-contract farmers in Kampong Speu province has been undertaken to examine the AKR contract farming scheme arrangements and to identify farmer’s motivations to participate in contract farming and its impact on farmers’ livelihood.AKR rice contract farming improves farmers’ livelihood because they get a higher income and rice yields. Higher price, good rice seed, and access to market are the main reasons for farmers to participate in AKR contract farming. However, strict requirements, heavy penalties, poor extension services, and lack of information about the contract terms and conditions reduce farmers’ long-term participation in contract farming. In addition

  13. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  14. Proposal for the award of an industrial services contract for software support for industrial controls

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for software support for industrial controls. Following a market survey carried out among 68 firms in twelve Member States, a call for tenders (IT-2711/ST) was sent on 12 April 2000 to nine firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from two firms and five consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm GTD (ES), the lowest bidder, for an initial period of three years from 1 October 2000, for a total amount not exceeding 4 500 000 Swiss francs, not subject to revision. The contract will include an option for two one-year extensions beyond the initial three-year period. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: ES?100%.

  15. Comparative analysis of petroleum exploration contracts

    International Nuclear Information System (INIS)

    1996-01-01

    A principal mandate of the UNCTAD's Division on Transnational Corporations and Investment (DTCI) is to provide advisory and training services to requesting Governments aimed at strengthening their capabilities in dealing with the whole range of issues which arise in relationships between the Governments of host countries and transnational corporations (TNCs) in any natural resource, manufacturing or service sector. One of the areas in which DTCI has assisted many Governments and has accumulated considerable knowledge and experience is on matters related to the involvement of TNCs in the exploration, development and production of national petroleum resources. In this context, DTCI has provided advisory and training services related to formulating or reviewing national petroleum policies, laws and regulations, including taxation in the petroleum sector; assessing the merits of alternative forms of contractual arrangements taking into account national objectives and resources; formulating or reviewing bidding arrangements and procedures; drafting or reviewing model contracts and undertaking related economic and computer analyses; evaluating the economic, financial, legal and operational aspects of specific proposed contractual arrangements with TNCs; evaluating bids received from TNCs M the context of specific projects; preparing for negotiation with TNCs, including the formulation of negotiating positions and strategies; and formulating or reviewing legislative, institutional and other arrangements related to the establishment, functions and operation of national petroleum companies. The objective of the present paper is to assist policy-makers, especially in developing countries, in taking full advantage of the changing and increasingly complex forms of relationship evolving between host Governments and TNCs in the petroleum sector. The paper takes into account the policies and arrangements adopted by Governments in their dealings with TNCs, as well as DTCI's own

  16. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  17. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  18. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  19. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  20. Tokamak Fusion Test Reactor Project

    International Nuclear Information System (INIS)

    1983-01-01

    Where the project's major contracts for buildings and equipment have experienced significant increases in cost, even though the contracts were for fixed prices, IG concluded that a major reason for the increases was the failure to adequately specify requirements prior to awarding the contracts. IG recommended that the Department should develop guidelines on what constitutes an adequate specification for a fixed-price contract and what controls should be placed over change orders. The Assistant Secretary for Management and Administration indicated in his comments to the draft report that an upcoming revision of the Accounting Practices and Procedures Handbook would establish controls over reallocations of construction funds to operating funds. Recommendations also propose that particular attention be given to ensuring that an agreed-upon plan and budget for completing the project is established, that a performance measurement system be implemented by the Princeton Plasma Physics Laboratory, and that improvements be made in the laboratory's Cost/Schedule Performance Report. Improvements are also needed in the quality assurance and safety programs of the Princeton Plasma Physics Laboratory. A number of recommendations from previous quality-assurance and safety reviews, performed by personnel from the Princeton Plasma Physics Laboratory and the Department of Energy, have not been implemented. Comments to the draft report also address these outstanding issues

  1. Note on Deduction Theorems in contraction-free logics

    Czech Academy of Sciences Publication Activity Database

    Chvalovský, Karel; Cintula, Petr

    2012-01-01

    Roč. 58, č. 3 (2012), s. 236-243 ISSN 0942-5616 R&D Projects: GA ČR GAP202/10/1826 Grant - others:Austrian Science Fund (FWF)(AT) START Y544-N23 Institutional research plan: CEZ:AV0Z10300504 Keywords : Local Deduction Theorem * BCI-logic * Substructural logics * Rule of contraction Subject RIV: BA - General Mathematics Impact factor: 0.376, year: 2012

  2. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  3. Proposal for the award of an industrial support contract for transport and handling services

    CERN Document Server

    1999-01-01

    This document concerns the award of an industrial support contract for transport and handling services. Following a market survey carried out among 49 firms in nine Member States, a call for tenders (IT-2395/ST/Revised) was sent on 7 April 1999 to two firms and six consortia in seven Member States. By the closing date, CERN had received six tenders. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DELATTRE-LEVIVIER (FR) ? BELLELI (IT) ? SETROVA (PT) the lowest bidder complying with the specification, for an initial period of three years, from 1st May 2000, for a total amount not exceeding 22 000 000 Swiss francs, not subject to revision until 30 April 2003. The contract will include an option for two one-year extensions beyond the initial three-year period.

  4. Service contracts in the petroleum industry - a practical approach; Contrato de servicos na industria do petroleo - uma abordagem pratica

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Sidney P. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The worldwide competition and the availability of new business opportunities have paved the way for service contracts as an attractive option when performing feasibility analysis for gas and energy projects. This paper addresses this subject and incorporates the experience gotten at PETROBRAS focusing on Compression Service Contract for Gas Pipeline Transmission System and also on Gas Processing Contract for gas dew point adjustment for natural gas production so as to specify the gas for industrial and automotive use. The methodology presented, that incorporates Monte Carlo Simulation for Risk Analysis, can be applied for any project with similar characteristics. This paper also underlines the importance of the use of Risk Analysis for feasibility studies. (author)

  5. Advanced calculations developed for the ITER project within of engineering support framework contracts to F4E; Calculos avanzados desarrollados para el proyecto ITER dentro de los contratos marco de soporte de ingenieria para F4E

    Energy Technology Data Exchange (ETDEWEB)

    Bosch, C.; Polo, J.; Garcia Cid, J.; Guirao, J.; Fernandez, E.; Bayon, A.; Caixas, J.

    2013-07-01

    Present the different kind of analyses carried out within the engineering support framework contracts for F4E in the period 2009-2013 and its evolution according to project needs and Vacuum Vessel manufacturing status.

  6. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  7. Contraction mode and whey protein intake affect the synthesis rate of intramuscular connective tissue

    DEFF Research Database (Denmark)

    Holm, Lars; Klejs Rahbek, Stine; Farup, Jean

    2016-01-01

    either WPH or maltodextrin [carbohydrate (CHO)] immediately after completion of unilateral shortening and lengthening knee extensions. Ring-13C6-phenylalanine was infused, and muscle biopsies were obtained. IMCT protein FSR was measured at 1–5, as well as 1–3 and 3–5 hours after contractions and nutrient...

  8. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Directory of Open Access Journals (Sweden)

    Jessica A Kaminsky

    Full Text Available This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  9. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Science.gov (United States)

    Kaminsky, Jessica A

    2017-01-01

    This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  10. 18 CFR 367.24 - Construction and service contracts for other companies.

    Science.gov (United States)

    2010-04-01

    ... classification of expenditures relating to projects that will meet the accounting requirements of the company for... companies. (a) Expenditures made in the performance of construction or service contracts, under which the..., construction payrolls, outside services, and other expenses which are directly attributable to the performance...

  11. Problems of implementing a large contract abroad: the Cordoba nuclear power station

    International Nuclear Information System (INIS)

    Caruso, P.

    1984-01-01

    The building of Argentina's second nuclear power station proved to be a true test of project-management skills: the contract was to be a joint effort between an Italian and a Canadian company, to be implemented in a country thousands of miles away; the Argentinian government changed four times during the course of the project; and the local currency was always unstable and unpredictable. The various difficulties that arose, and how they were solved, are described, and the role of the project management is evaluated. (author)

  12. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  13. 77 FR 10767 - Rate Adjustments for Indian Irrigation Projects

    Science.gov (United States)

    2012-02-23

    ... Irrigation Project on the proposed rates about the following issues: (1) The methodology for O&M rate setting..., Irrigation Project Manager, (Project operations and management contracted to Tribes), R.R.1, Box 980, Harlem... Projects AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice of rate adjustments. SUMMARY: The...

  14. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  15. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  16. Final Technical Report for contract number DE-FG02-05ER15670

    Energy Technology Data Exchange (ETDEWEB)

    Glazebrook, Jane [Univ. of Minnesota, Minneapolis, MN (United States)

    2016-02-29

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  17. Contracting but not without caution: experience with outsourcing of health services in countries of the Eastern Mediterranean Region.

    Science.gov (United States)

    Siddiqi, Sameen; Masud, Tayyeb Imran; Sabri, Belgacem

    2006-01-01

    The public sector in developing countries is increasingly contracting with the non-state sector to improve access, efficiency and quality of health services. We conducted a multicountry study to assess the range of health services contracted out, the process of contracting and its influencing factors in ten countries of the Eastern Mediterranean Region: Afghanistan, Bahrain, Egypt, Islamic Republic of Iran, Jordan, Lebanon, Morocco, Pakistan, the Syrian Arab Republic and Tunisia. Our results showed that Afghanistan, Egypt, Islamic Republic of Iran and Pakistan had experience with outsourcing of primary care services; Jordan, Lebanon and Tunisia extensively contracted out hospital and ambulatory care services; while Bahrain, Morocco and the Syrian Arab Republic outsourced mainly non-clinical services. The interest of the non-state sector in contracting was to secure a regular source of revenue and gain enhanced recognition and credibility. While most countries promoted contracting with the private sector, the legal and bureaucratic support in countries varied with the duration of experience with contracting. The inherent risks evident in the contracting process were reliance on donor funds, limited number of providers in rural areas, parties with vested interests gaining control over the contracting process, as well as poor monitoring and evaluation mechanisms. Contracting provides the opportunity to have greater control over private providers in countries with poor regulatory capacity, and if used judiciously can improve health system performance. PMID:17143460

  18. Contracting but not without caution: experience with outsourcing of health services in countries of the Eastern Mediterranean Region.

    Science.gov (United States)

    Siddiqi, Sameen; Masud, Tayyeb Imran; Sabri, Belgacem

    2006-11-01

    The public sector in developing countries is increasingly contracting with the non-state sector to improve access, efficiency and quality of health services. We conducted a multicountry study to assess the range of health services contracted out, the process of contracting and its influencing factors in ten countries of the Eastern Mediterranean Region: Afghanistan, Bahrain, Egypt, Islamic Republic of Iran, Jordan, Lebanon, Morocco, Pakistan, the Syrian Arab Republic and Tunisia. Our results showed that Afghanistan, Egypt, Islamic Republic of Iran and Pakistan had experience with outsourcing of primary care services; Jordan, Lebanon and Tunisia extensively contracted out hospital and ambulatory care services; while Bahrain, Morocco and the Syrian Arab Republic outsourced mainly non-clinical services. The interest of the non-state sector in contracting was to secure a regular source of revenue and gain enhanced recognition and credibility. While most countries promoted contracting with the private sector, the legal and bureaucratic support in countries varied with the duration of experience with contracting. The inherent risks evident in the contracting process were reliance on donor funds, limited number of providers in rural areas, parties with vested interests gaining control over the contracting process, as well as poor monitoring and evaluation mechanisms. Contracting provides the opportunity to have greater control over private providers in countries with poor regulatory capacity, and if used judiciously can improve health system performance.

  19. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  20. 42 CFR 137.410 - For the purposes of section 110 of the Act [25 U.S.C. 450m-1] does the term contract include...

    Science.gov (United States)

    2010-10-01

    ....C. 450m-1] does the term contract include compacts, funding agreements, and construction project... the term contract include compacts, funding agreements, and construction project agreements entered into under Title V? Yes, for the purposes of section 110 of the Act [25 U.S.C. 450m-1] the term...

  1. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  2. Manipulation of procurement contracts: evidence from the introduction of discretionary thresholds

    Czech Academy of Sciences Publication Activity Database

    Palguta, Ján; Pertold, Filip

    2017-01-01

    Roč. 9, č. 2 (2017), s. 293-315 ISSN 1945-7731 R&D Projects: GA TA ČR(CZ) TD020099 Institutional support: RVO:67985998 Keywords : public procurement * contracts * corruption Subject RIV: AH - Economics OBOR OECD: Applied Economics, Econometrics Impact factor: 3.133, year: 2016

  3. Research of Project Cost Management System Based on the Target Cost Contract%基于目标成本合同的工程项目成本管理体系研究

    Institute of Scientific and Technical Information of China (English)

    陈继光

    2016-01-01

    With the constant construction of social engineering, the theory and method of project management also have the rapid development in the process. And the mode of partners' relationships is more advocated. Among them, the target cost contract is a kind of relatively common partnership mode, it can help project contractor and owner to gain better economic benefits. This paper studies the engineering project cost management system of the target cost contract.%随着社会工程的不断建设,工程项目管理的理论以及方法也在此过程中得到了较为快速的发展,且更加倡导合作伙伴的关系模式.其中,目标成本合同则是一种较为常用的伙伴关系模式,能够帮助项目承包商以及业主更好的从中获得经济收益.在本文中,将就基于目标成本合同的工程项目成本管理体系进行一定的研究.

  4. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  5. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  6. Personal Sustainability: Listening to Extension Staff and Observing Organizational Culture

    Science.gov (United States)

    Forstadt, Leslie; Fortune, Aileen

    2016-01-01

    Extension staff are increasingly challenged to do excellent work and balance their lives. University of Maine Cooperative Extension committed to a 2-year participatory action research project to support staff and to an organizational climate that encourages personal sustainability. With tools from ethnography and appreciative inquiry, staff…

  7. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  8. NDE and plant life extension

    International Nuclear Information System (INIS)

    Liu, S.N.; Ammirato, F.V.; Nottingham, L.D.

    1991-01-01

    Component life extension is the process of making run-repair-replace decisions for plant components and includes a thorough analysis of the capability of the component to perform throughout the projected lifetime. For many critical plant components, nondestructive evaluation (NDE) is essential in determining whether the component can be operated safely and economically in the extended life period and to help utilities determine safe and economic inspection intervals. NDE technology is required for not only detecting defects that could grow to a size of concern during extended lifetimes, but also will be called upon to measure and monitor accumulating material degradation that strongly affects component reliability. This paper discusses the role of NDE in life extension by reviewing three examples--a reactor pressure vessel, steam turbine-generator rotors, and generator retaining rings. In each example, the contribution of NDE to life extension decisions is described. (author)

  9. RAPID KNEE-EXTENSIONS TO INCREASE QUADRICEPS MUSCLE ACTIVITY IN PATIENTS WITH TOTAL KNEE ARTHROPLASTY

    DEFF Research Database (Denmark)

    Husted, Rasmus Skov; Wilquin, Lousia; Jakobsen, Thomas Linding

    2017-01-01

    rapid knee-extensions were associated with greater voluntary quadriceps muscle activity during an experimental strength training session, compared to that elicited using slow knee-extensions. STUDY DESIGN: A randomized cross-over study. METHODS: Twenty-four patients (age 66.5) 4-8 weeks post total knee...... agonist muscle activity, especially if the exercise is conducted using rapid muscle contractions. PURPOSE: The purpose of this study was to examine if patients with total knee arthroplasty could perform rapid knee-extensions using a 10 RM load four to eight weeks after surgery, and the degree to which...... arthroplasty randomly performed one set of five rapid, and one set of five slow knee-extensions with the operated leg, using a load of their 10 repetition maximum, while surface electromyography recordings were obtained from the vastus medialis and lateralis of the quadriceps muscle. RESULTS: Data from 23...

  10. Rapid knee-extensions to increase quadriceps muscle activity in patients with total knee arthroplasty

    DEFF Research Database (Denmark)

    Husted, Rasmus Skov; Wilquin, Lousia; Jakobsen, Thomas Linding

    2017-01-01

    rapid knee-extensions were associated with greater voluntary quadriceps muscle activity during an experimental strength training session, compared to that elicited using slow knee-extensions. STUDY DESIGN: A randomized cross-over study. METHODS: Twenty-four patients (age 66.5) 4-8 weeks post total knee...... agonist muscle activity, especially if the exercise is conducted using rapid muscle contractions. PURPOSE: The purpose of this study was to examine if patients with total knee arthroplasty could perform rapid knee-extensions using a 10 RM load four to eight weeks after surgery, and the degree to which...... arthroplasty randomly performed one set of five rapid, and one set of five slow knee-extensions with the operated leg, using a load of their 10 repetition maximum, while surface electromyography recordings were obtained from the vastus medialis and lateralis of the quadriceps muscle. RESULTS: Data from 23...

  11. Treatment of Berkeley boilers in Studsvik. Project description and experiences - Berkeley Boilers Project

    International Nuclear Information System (INIS)

    Saul, Dave; Davidson, Gavin; Wirendal, Bo

    2014-01-01

    In November 2011 Studsvik was awarded a contract to transport five decommissioned boilers from the Berkeley Nuclear Licensed Site in the UK to the Studsvik Nuclear Site in Sweden for metal treatment and recycling. A key objective of the project was to remove the boilers from the site by 31 March 2012 and this was successfully achieved with all boilers off site by 22 March and delivered to Studsvik on 6 April. In November 2012 Studsvik was awarded a further contract for the remaining ten Berkeley Boilers with the requirement to remove all boilers from the Berkeley site by 31 March 2013. Again this was successfully achieved ahead of programme with all boilers in Sweden by 1 April 2013. A total of nine boilers have now been processed and all remaining boilers will be completed by end of September 2014. The projects have had many challenges including a very tight timescale and both have been successfully delivered to cost and ahead of the baseline programme. This paper describes the project and the experience gained from treatment of the boilers to date. (authors)

  12. Extensible threat taxonomy for critical infrastructures

    NARCIS (Netherlands)

    Luiijf, H.A.M.; Nieuwenhuijs, A.H.

    2008-01-01

    The European Union-sponsored project Vital Infrastructure Threats and Assurance (VITA) has the objective of exploring and showing new paths in Critical Infrastructure Protection (CIP) R&D. This paper describes one of VITA’s results: the idea and the development of a novel extensible and generic

  13. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  14. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  15. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  16. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  17. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  18. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  19. Effects of contraction duration on low-frequency fatigue in voluntary and electrically induced exercise of quadriceps muscle in humans.

    Science.gov (United States)

    Ratkevicius, A; Skurvydas, A; Povilonis, E; Quistorff, B; Lexell, J

    1998-04-01

    The aims of this study were to investigate if low-frequency fatigue (LFF) dependent on the duration of repeated muscle contractions and to compare LFF in voluntary and electrically induced exercise. Male subjects performed three 9-min periods of repeated isometric knee extensions at 40% maximal voluntary contraction with contraction plus relaxation periods of 30 plus 60 s, 15 plus 30 s and 5 plus 10 s in protocols 1, 2 and 3, respectively. The same exercise protocols were repeated using feedback-controlled electrical stimulation at 40% maximal tetanic torque. Before and 15 min after each exercise period, knee extension torque at 1, 7, 10, 15, 20, 50 and 100 Hz was assessed. During voluntary exercise, electromyogram root mean square (EMGrms) of the vastus lateralis muscle was evaluated. The 20-Hz torque:100-Hz torque (20:100 Hz torque) ratio was reduced more after electrically induced than after voluntary exercise (P exercise, the decrease in 20:100 Hz torque ratio was gradually (P exercise, the decrease in 20:100 Hz torque ratio and the increase in EMGrms were greater in protocol 1 (P exercise and that the electrically induced exercise produced a more pronounced LFF compared to voluntary exercise of submaximal intensity. It is suggested that compensatory recruitment of faster-contracting motor units is an additional factor affecting the severity of LFF during voluntary exercise.

  20. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  1. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  2. Project approach study for nuclear power plants in the Netherlands

    International Nuclear Information System (INIS)

    1985-11-01

    The new nuclear program in the Netherlands comprises the construction of two to four nuclear power plants up to the year 2000. The main objective pursued with the implementation of the nuclear program is the supply of low-cost electricity in the future. In order to prepare the program and to provide a basis for further decisions, the Ministry of Economic Affairs has entrusted Motor-Columbus Consulting Engineers Inc., Baden, Switzerland, with a study to determine the most suitable project approach option(s) for the implementation of the future nuclear program in the Netherlands. In carrying out this study, Motor-Columbus investigated the following main project approach options: 1. turnkey contract approach; 2. split-package contract approach; 3. multi-contract approach. It is concluded that if applied in the appropriate way, the normal turnkey contract approach represents the most suitable approach under the prevailing situation in the Netherlands. (orig.)

  3. To tender, re-negotiate or partner: Strategies for contracting service companies

    International Nuclear Information System (INIS)

    Gouldie, T.A.

    1994-01-01

    The contracting of oilfield service companies by petroleum exploration and production operating companies is different than the contracting of civil engineering, construction or other project-oriented contractors. The relationship between operating companies and oilfield service companies has had a long and unique history which has evolved since the first oil wells were drilled over a century ago. The process of contracting service companies by operating companies for petroleum exploration and production work can be split into three distinct stages: (1) decide what it is that should be contracted out and what should be kept in house; (2) determine the method to use to select the contractor(s) to perform the work; and (3) agree to the contractual structure to best reflect the relationship the operating company and the service company with to initiate and maintain. As there are ongoing changes to the business structures and corporate thinking of both operating and service companies, there are also evolving changes to what are considered core businesses and the methods of selecting and contracting service companies by operating companies. Operating companies are recognizing the high costs of tendering for contractor services in terms of personnel time and administrative effort, and are relying more on negotiating and rolling-over existing contracts with their suitable, capable contractors. Partnering, in its many forms and levels, is increasingly being recognized as a useful method to get better work done at cheaper overall costs

  4. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  5. The 'bankability' of the new waste technologies: an econometric method for risk sharing in private finance waste contracts.

    Science.gov (United States)

    Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J

    2011-12-01

    The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.

  6. Assessment of Farmers (Women)' Access to Agricultural Extension ...

    African Journals Online (AJOL)

    Available online at http://www.ajol.info/index.php/njbas/index. Nigerian Journal of ... Key words: Assessment, Farmers, Access, Agricultural Extension, Credit Facility. INTRODUCTION ..... Unpublished Project Proposal, The. Department of Agric ...

  7. LNG project - contractual aspects

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Bruno Almeida

    2008-07-01

    This paper intends to provide from the legal point of view an outline of the main challenges of a LNG project in the upstream, regulatory aspects, liquefaction, financing and midstream through a basic checklist; an overview of the contractual complexity of a LNG project; some basic discussion of particular LNG contract clauses; and a comparative analysis between the classic clauses of a Gas Transportation Agreement (GTA) through a gas pipeline and LNG logistic. (author)

  8. A Classification and Analysis of National Contract Management Journal Articles from 1990 to 1999 and Journal of Supply Chain Management Articles from 1987 to 2000

    National Research Council Canada - National Science Library

    Browne, Forrest

    2001-01-01

    .... A secondary objective of this thesis was to assess the differences in subject matter between the two journals and by extension, the differences between Government contracting literature and commercial purchasing literature. The final objective of this thesis was to compile an annotated bibliography of articles primed in the contracting journal that have not been previously annotated.

  9. Open release of the DCA++ project

    Science.gov (United States)

    Haehner, Urs; Solca, Raffaele; Staar, Peter; Alvarez, Gonzalo; Maier, Thomas; Summers, Michael; Schulthess, Thomas

    We present the first open release of the DCA++ project, a highly scalable and efficient research code to solve quantum many-body problems with cutting edge quantum cluster algorithms. The implemented dynamical cluster approximation (DCA) and its DCA+ extension with a continuous self-energy capture nonlocal correlations in strongly correlated electron systems thereby allowing insight into high-Tc superconductivity. With the increasing heterogeneity of modern machines, DCA++ provides portable performance on conventional and emerging new architectures, such as hybrid CPU-GPU and Xeon Phi, sustaining multiple petaflops on ORNL's Titan and CSCS' Piz Daint. Moreover, we will describe how best practices in software engineering can be applied to make software development sustainable and scalable in a research group. Software testing and documentation not only prevent productivity collapse, but more importantly, they are necessary for correctness, credibility and reproducibility of scientific results. This research used resources of the Oak Ridge Leadership Computing Facility (OLCF) awarded by the INCITE program, and of the Swiss National Supercomputing Center. OLCF is a DOE Office of Science User Facility supported under Contract DE-AC05-00OR22725.

  10. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  11. Proposal for the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment with SCHNEIDER (FR) for a total amount of 1 100 000 euros (1 742 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  12. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  13. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  14. Contract-program evaluation: Impact of the DRG classification system on hospitals' outputs

    OpenAIRE

    Alves, Helder António Pereira Gomes

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The present work project aims at evaluating the impact of contract-program implementation in 2003 and of incentives created in 2007 on hospital output, under the DRG inpatient classification system. A sample of five Portuguese acute public district hospitals was chosen as sample, between 2002 and 2007. Results of hypothesis testing ...

  15. E-Commerce in Europe - Relevant Law when Concluding a Contract on the Internet

    Czech Academy of Sciences Publication Activity Database

    Matejka, Ján; Štědroň, B.

    2004-01-01

    Roč. 4, č. 1 (2004), s. 45-49 ISSN 1213-4678 R&D Projects: GA AV ČR KJB7068402 Institutional research plan: CEZ:AV0Z7068917 Keywords : e- commerce * contract law * information society Subject RIV: AG - Legal Sciences

  16. CIDOC-CRM extensions for conservation processes: A methodological approach

    Science.gov (United States)

    Vassilakaki, Evgenia; Zervos, Spiros; Giannakopoulos, Georgios

    2015-02-01

    This paper aims to report the steps taken to create the CIDOC Conceptual Reference Model (CIDOC-CRM) extensions and the relationships established to accommodate the depiction of conservation processes. In particular, the specific steps undertaken for developing and applying the CIDOC-CRM extensions for defining the conservation interventions performed on the cultural artifacts of the National Archaeological Museum of Athens, Greece are presented in detail. A report on the preliminary design of the DOC-CULTURE project (Development of an integrated information environment for assessment and documentation of conservation interventions to cultural works/objects with nondestructive testing techniques [NDTs], www.ndt-lab.gr/docculture), co-financed by the European Union NSRF THALES program, can be found in Kyriaki-Manessi, Zervos & Giannakopoulos (1) whereas the NDT&E methods and their output data through CIDOC-CRM extension of the DOC-CULTURE project approach to standardize the documentation of the conservation were further reported in Kouis et al. (2).

  17. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  18. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  19. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  20. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  1. Government Contracting Should Be a Core Competence for U.S. Military Personnel

    Science.gov (United States)

    2014-12-01

    selves may have distorted the local market , creating inflation problems in the region.65 Thus, long-term projects or services that are to be turned...are injected into the process to avoid rampant single-award-task and-delivery order contracts that effectively inject monopolistic -type pricing

  2. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  3. Proposal for the award of a contract for industrial support for logistics and stores operations

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for industrial support for logistics and stores operations. Following a market survey carried out among 59 firms in ten Member States, a call for tenders (IT-2401/SPL/Revised) was sent on 11 March 1999 to five firms and four consortia in five Member States. By the closing date, CERN had received eight tenders from five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS GEBÄUDESERVICE (DE) - ISS SERVISYSTEM (CH) the lowest bidder complying with the specification, for industrial support for logistics and stores operations over a period of three years, starting on 1st January 2000, for a total amount of 3 830 000 Swiss francs, not subject to revision. The contract will include an option for two one-year extensions beyond the initial three-year period.

  4. Covariant extensions and the nonsymmetric unified field

    International Nuclear Information System (INIS)

    Borchsenius, K.

    1976-01-01

    The problem of generally covariant extension of Lorentz invariant field equations, by means of covariant derivatives extracted from the nonsymmetric unified field, is considered. It is shown that the contracted curvature tensor can be expressed in terms of a covariant gauge derivative which contains the gauge derivative corresponding to minimal coupling, if the universal constant p, characterizing the nonsymmetric theory, is fixed in terms of Planck's constant and the elementary quantum of charge. By this choice the spinor representation of the linear connection becomes closely related to the spinor affinity used by Infeld and Van Der Waerden (Sitzungsber. Preuss. Akad. Wiss. Phys. Math. Kl.; 9:380 (1933)) in their generally covariant formulation of Dirac's equation. (author)

  5. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  6. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  7. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  8. Cogeneration new electric power purchase contract. What is the impact of the new regulation framework approved in december 2002

    International Nuclear Information System (INIS)

    Loffler, P.; Guenaire, M.; Balaguier, Ph.; Haushalter, J.; Fraisse, J.L.; Bernard, L.; Gauthier, J.M.; Tronche, D.; Ravetto, P.

    2003-06-01

    This conference deals with the following topics: the new legal framework and the future contracts evolution, is it possible and interesting to take advantage of the new purchase contract, energy efficiency and technical innovation, the problems of the electric power network integration, the organization of a cogeneration project, experiences examples. (A.L.B.)

  9. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  10. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available   Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  11. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    Energy Technology Data Exchange (ETDEWEB)

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  12. Proposal for the award of an industrial support contract for operation of the CERN telephone system

    CERN Document Server

    1999-01-01

    This document concerns the award of an industrial support contract for operation of the CERN telephone system. Following a market survey carried out among 22 firms in eight Member States, a call for tenders (IT-2655/ST) was sent on 27 August 1999 to three firms and two consortia in four Member States. By the closing date, CERN had received three tenders from one firm and two consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium MERROW (UK) ? DCS (CH) the lowest bidder, for an initial period of three years from 1st January 2000, for a total amount not exceeding 850 000 Swiss francs, not subject to revision until 31 December 2000. The contract will include an option for two one-year extensions beyond the initial three-year period.

  13. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  14. A Note on Natural Extensions in Abstract Algebraic Logic

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr; Noguera, Carles

    2015-01-01

    Roč. 103, č. 4 (2015), s. 815-823 ISSN 0039-3215 R&D Projects: GA ČR(CZ) GA13-14654S EU Projects: European Commission(XE) 247584 - MATOMUVI Institutional support: RVO:67985807 ; RVO:67985556 Keywords : abstract algebraic logic * consequence relations * natural extensions * transfer theorems Subject RIV: BA - General Mathematics Impact factor: 0.724, year: 2015

  15. Informed Principal Model and Contract in Supply Chain with Demand Disruption Asymmetric Information

    Directory of Open Access Journals (Sweden)

    Huan Zhang

    2016-01-01

    Full Text Available Because of the frequency and disastrous influence, the supply chain disruption has caused extensive concern both in the industry and in the academia. In a supply chain with one manufacturer and one retailer, the demand of the retailer is uncertain and meanwhile may suffer disruption with a probability. Taking the demand disruption probability as the retailer’s asymmetric information, an informed principal model with the retailer as the principal is explored to make the contract. The retailer can show its information to the manufacturer through the contract. It is found out that the high-risk retailer intends to pretend to be the low-risk one. So the separating contract is given through the low-information-intensity allocation, in which the order quantity and the transferring payment for the low-risk retailer distort upwards, but those of high-risk retailer do not distort. In order to reduce the signaling cost which the low-risk retailer pays, the interim efficient model is introduced, which ends up with the order quantity and transferring payment distorting upwards again but less than before. In the numerical examples, with two different mutation probabilities, the informed principal contracts show the application of the informed principal model in the supply chain with demand disruption.

  16. Projected range contractions of European protected oceanic montane plant communities: focus on climate change impacts is essential for their future conservation.

    Science.gov (United States)

    Hodd, Rory L; Bourke, David; Skeffington, Micheline Sheehy

    2014-01-01

    Global climate is rapidly changing and while many studies have investigated the potential impacts of this on the distribution of montane plant species and communities, few have focused on those with oceanic montane affinities. In Europe, highly sensitive bryophyte species reach their optimum occurrence, highest diversity and abundance in the north-west hyperoceanic regions, while a number of montane vascular plant species occur here at the edge of their range. This study evaluates the potential impact of climate change on the distribution of these species and assesses the implications for EU Habitats Directive-protected oceanic montane plant communities. We applied an ensemble of species distribution modelling techniques, using atlas data of 30 vascular plant and bryophyte species, to calculate range changes under projected future climate change. The future effectiveness of the protected area network to conserve these species was evaluated using gap analysis. We found that the majority of these montane species are projected to lose suitable climate space, primarily at lower altitudes, or that areas of suitable climate will principally shift northwards. In particular, rare oceanic montane bryophytes have poor dispersal capacity and are likely to be especially vulnerable to contractions in their current climate space. Significantly different projected range change responses were found between 1) oceanic montane bryophytes and vascular plants; 2) species belonging to different montane plant communities; 3) species categorised according to different biomes and eastern limit classifications. The inclusion of topographical variables in addition to climate, significantly improved the statistical and spatial performance of models. The current protected area network is projected to become less effective, especially for specialised arctic-montane species, posing a challenge to conserving oceanic montane plant communities. Conservation management plans need significantly

  17. Projected range contractions of European protected oceanic montane plant communities: focus on climate change impacts is essential for their future conservation.

    Directory of Open Access Journals (Sweden)

    Rory L Hodd

    Full Text Available Global climate is rapidly changing and while many studies have investigated the potential impacts of this on the distribution of montane plant species and communities, few have focused on those with oceanic montane affinities. In Europe, highly sensitive bryophyte species reach their optimum occurrence, highest diversity and abundance in the north-west hyperoceanic regions, while a number of montane vascular plant species occur here at the edge of their range. This study evaluates the potential impact of climate change on the distribution of these species and assesses the implications for EU Habitats Directive-protected oceanic montane plant communities. We applied an ensemble of species distribution modelling techniques, using atlas data of 30 vascular plant and bryophyte species, to calculate range changes under projected future climate change. The future effectiveness of the protected area network to conserve these species was evaluated using gap analysis. We found that the majority of these montane species are projected to lose suitable climate space, primarily at lower altitudes, or that areas of suitable climate will principally shift northwards. In particular, rare oceanic montane bryophytes have poor dispersal capacity and are likely to be especially vulnerable to contractions in their current climate space. Significantly different projected range change responses were found between 1 oceanic montane bryophytes and vascular plants; 2 species belonging to different montane plant communities; 3 species categorised according to different biomes and eastern limit classifications. The inclusion of topographical variables in addition to climate, significantly improved the statistical and spatial performance of models. The current protected area network is projected to become less effective, especially for specialised arctic-montane species, posing a challenge to conserving oceanic montane plant communities. Conservation management plans need

  18. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  19. Numerical modelling of air flow attributes in a contractions chamber

    Czech Academy of Sciences Publication Activity Database

    Michalcová, V.; Kuznetsov, Sergeii; Pospíšil, Stanislav

    2014-01-01

    Roč. 14, č. 2 (2014), s. 11-16 ISSN 1804-4824 R&D Projects: GA ČR(CZ) GA14-12892S; GA MŠk(CZ) LO1219 Keywords : aerodynamics * wind tunnel contraction * CFD Subject RIV: JN - Civil Engineering http://www.degruyter.com/view/j/tvsb.2014.14.issue-2/tvsb-2014-0026/tvsb-2014-0026. xml ?format=INT

  20. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.