WorldWideScience

Sample records for project annual status

  1. Kootenai River Fisheries Investigation : Stock Status of Burbot : Project Progress Report 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Valughn L.; Laude Dorothy C.

    2008-12-26

    Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C) until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.

  2. Waste Tank Vapor Characterization Project: Annual status report for FY 1995

    International Nuclear Information System (INIS)

    Ligotke, M.W.; Fruchter, J.S.; Huckaby, J.L.; Birn, M.B.; McVeety, B.D.; Evans, J.C. Jr.; Pool, K.H.; Silvers, K.L.; Goheen, S.C.

    1995-11-01

    This report compiles information collected during the Fiscal Year 1995 pertaining to the waste tank vapor characterization project. Information covers the following topics: project management; organic sampling and analysis; inorganic sampling and analysis; waste tank vapor data reports; and the waste tanks vapor database

  3. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    Science.gov (United States)

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.

  4. Nuclear safety research project. Annual report 1995

    International Nuclear Information System (INIS)

    Hueper, R.

    1996-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZK) has been part of the Nuclear Safety Research Project (PSF) since 1990. The present annual report 1995 summarizes the R and D results. The research tasks are coordinated in agreement with internal and external working groups. The contributions to this report correspond to the status of early 1996. An abstract in English precedes each of them, whenever the respective article is written in German. (orig.) [de

  5. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  6. Status of CSNS project

    International Nuclear Information System (INIS)

    Zhang, J.; Fu, S.N.; Chen, H.S.

    2015-01-01

    The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planned to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project. (author)

  7. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  8. Status of Standardization Projects

    Science.gov (United States)

    1991-06-30

    MCA GL G4 913 914 914 A GL SA 50 SS N D 8915 TOTAL- 6. DELINQUENT- 0. STATUS CODES: A- 5, G- 1. Y- 0, Z- 0 8920 0539 MIL R 35084A RICE INSTANT ENRICHED...44171GL CARROTS GLA POW GL H5 904 914 914 A N D 8940 A693 MIL N 44178GL NOODLES PARMESAN AND ROMA GL H5 904 914 914 A N D 8940 A694 MIL P 44181GL PIE...20184 COFFEE INSTANT GL B4 A 893 903 913 A GL SA 50 SS U B 8955 0062 MIL T 3527D I NOT 1 TEA INSTANT GL H5 912 921 921 A GL SA 50 SS N 8955 TOTAL- 2

  9. 1982 annual status report. Nuclear measurements

    International Nuclear Information System (INIS)

    1983-01-01

    The Nuclear Measurement programme is briefly presented in this status report, it is divided in two main projects, Nuclear Data on the one hand (neutron data, non neutron nuclear data) and Nuclear Reference Materials and Techniques on the other (nuclear reference materials, samples and targets for nuclear measurements, development of reference techniques, study for the production of enriched actinide isotopes)

  10. Status of Standardization Projects

    Science.gov (United States)

    1993-12-31

    A5 B 942 943 943 ASM SA 69 D, 8115 056; ASTM D 5118 FABRICATION OF FIBERBOARD SM AS B 941 943 943 A SM SA 69 Di- N 8115 0562 ASTM D 5168 FAB AND...DR&E(AR)759 STANDARDIZATION PROJECTS REPORT - 1ST QTR FY 1994 PREPARING ACTIVITY LISTING PA AAPAA p BPP .A- G/ASA NC AC 21 RC G CSOL- Qý yqFyýFT7RL AL...941 943 943 A SM SA 69 DH N 8115 0562 ASTM D 5168 FAB AND CLOSURE TRIPLE WALL SM AS B 941 943 943 A SM SA 69 DH N 8125 0379 V’L-B-61000 BOTTLES

  11. Reactor incident status 1981 annual report

    International Nuclear Information System (INIS)

    Kiser, S.H.

    1982-01-01

    Reactor Incident followup action is summarized through periodic status reports. This annual report summarizes action taken or anticipated for Reactor Incidents through December 1981. Incidents for which action has been completed, have been deleted from the report. Quarterly addende will update the report by tabulating incidents for each three month period through the coming year. The report consists of a part for the P, K, and C Reactors. Each reactor part is divided into three sections: Further Technical Analysis or Followup Needed; Funding and/or Implementation Needed; and No Further Technical Analysis Anticipated

  12. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  13. Annual Report 2015: Project Glossines

    International Nuclear Information System (INIS)

    2016-04-01

    On the basis of the results of the feasibility study which (i) confirmed the presence of Glossina palpalis gambiensis on the Dakar-Thies-Kayar triangle and the disease it transmits (trypanosomiasis) and (ii) Isolated from the area in relation to other tsetse infested areas, the control phase started in 2010. The following results were obtained: block I (Kayar) has been rehabilitated since 2012; populations of tsetse flies are reduced to more than 99% in Block II (Sebikotane, Diacsaw Peulh, Pout) where the release of sterile males of tsetse fly sterile insect technique since 2013 for the complete liberation of the area, are terminally ill; the reduction of tsetse populations has started since June 2015 in blocks 3a (Dakar, Rufisque) and 3b (Thies) with a success rate of more than 95%. Starting of sterile male releases is planned for June 2016; the prevalence of trypanosomiasis, a disease transmitted by tsetse flies, increased from 10% to less than 1%; the total elimination of tsetse flies in the Niayes area is expected by the end of 2017. Activities in 2015 consisted of entomological monitoring throughout the Project area (blocks 1, 2 and 3), suppression in the block 3, elimination in block 2, parasitological monitoring, environmental monitoring and socio-economic study at the selected sites. (Author)

  14. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  15. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  16. National Writing Project 2009 Annual Report

    Science.gov (United States)

    National Writing Project (NJ1), 2009

    2009-01-01

    Writing as a tool for thinking, learning, and communicating is crucial to academic and career success as well as to active citizenship in a democracy. This annual report of the National Writing Project features teachers of math, chemistry, art, history, and business who develop their students as writers. These educators employ writing to engage…

  17. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  18. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  19. Status of LLNL granite projects

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1980-01-01

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site

  20. Nuclear Safety Project - annual report 1980

    International Nuclear Information System (INIS)

    1981-08-01

    The Annual Report 1980 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1980 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work completed, essential results, plans for the near future. (orig./RW) [de

  1. Status of the DIRAC Project

    International Nuclear Information System (INIS)

    Casajus, A; Ciba, K; Fernandez, V; Graciani, R; Hamar, V; Mendez, V; Poss, S; Sapunov, M; Stagni, F; Tsaregorodtsev, A; Ubeda, M

    2012-01-01

    The DIRAC Project was initiated to provide a data processing system for the LHCb Experiment at CERN. It provides all the necessary functionality and performance to satisfy the current and projected future requirements of the LHCb Computing Model. A considerable restructuring of the DIRAC software was undertaken in order to turn it into a general purpose framework for building distributed computing systems that can be used by various user communities in High Energy Physics and other scientific application domains. The CLIC and ILC-SID detector projects started to use DIRAC for their data production system. The Belle Collaboration at KEK, Japan, has adopted the Computing Model based on the DIRAC system for its second phase starting in 2015. The CTA Collaboration uses DIRAC for the data analysis tasks. A large number of other experiments are starting to use DIRAC or are evaluating this solution for their data processing tasks. DIRAC services are included as part of the production infrastructure of the GISELA Latin America grid. Similar services are provided for the users of the France-Grilles and IBERGrid National Grid Initiatives in France and Spain respectively. The new communities using DIRAC started to provide important contributions to its functionality. Among recent additions can be mentioned the support of the Amazon EC2 computing resources as well as other Cloud management systems; a versatile File Replica Catalog with File Metadata capabilities; support for running MPI jobs in the pilot based Workload Management System. Integration with existing application Web Portals, like WS-PGRADE, is demonstrated. In this paper we will describe the current status of the DIRAC Project, recent developments of its framework and functionality as well as the status of the rapidly evolving community of the DIRAC users.

  2. Annual review of research projects 1984

    International Nuclear Information System (INIS)

    Keam, D.W.

    1986-02-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  3. Annual review of research projects 1983

    International Nuclear Information System (INIS)

    1985-08-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  4. Fish & Wildlife Annual Project Summary, 1983.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  5. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  6. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  7. Nuclear Safety Project. Annual report 1986

    International Nuclear Information System (INIS)

    1987-09-01

    The annual report 1986 is a detailed description of work within the Nuclear Safety Project performed in 1986 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes individual research activities on dynamic loads and strains of reactor components under accident conditions, fuel behaviour under accident conditions, investigation and control of LWR core-meltdown accidents, improvement of fission product retention and reduction of radiation exposure, and on behaviour, impact and removal of released pollutants. (DG)

  8. WFIRST: Project Overview and Status

    Science.gov (United States)

    Kruk, Jeffrey; WFIRST Formulation Science Working Group, WFIRST Project Team

    2018-01-01

    The Wide-Field InfraRed Survey Telescope (WFIRST) will be the next Astrophysics flagship mission to follow JWST. The observatory payload consists of a Hubble-size telescope aperture with a wide-field NIR instrument and a coronagraph operating at visible wavelengths and employing state-of-the-art wavefront sensing and control. The Wide-field instrument is optimized for large area NIR imaging and spectroscopic surveys, with performance requirements driven by programs to study cosmology and exoplanet detection via gravitational microlensing. All data will be public immediately, and a substantial guest observer program will be supported.The WFIRST Project is presently in Phase A, with a transition to Phase B expected in early to mid 2018. Candidate observing programs are under detailed study in order to inform the mission design, but the actual science investigations will not be selected until much closer to launch. We will present an overview of the present mission design and expected performance, a summary of Project status, and plans for selecting the observing programs.

  9. Annual review of research projects 1985

    International Nuclear Information System (INIS)

    Keam, D.W.

    1987-04-01

    This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material has been grouped into the following fields: uranium, radon and its daughters; radiation effects in solids and gases; x-rays and clinical dosimetry, measurement standards in radiation dosimetry; radiopharmaceuticals and nuclear medicine; non-ionising electromagnetic radiation; environmental radiochemistry and radiation monitoring. The last category includes residual radioactive contamination at Maralinga, Emu and the Monte Bello Islands from British nuclear weapons tests in Australia, and the public health impact of fall-out from those tests

  10. 1981 Annual Status Report: thermonuclear fusion technology

    International Nuclear Information System (INIS)

    1982-01-01

    The work perfomed on 1981 concerns four projects, namely: - The project 1: ''Reactor Studies''. During 1981 this activity was made in support to the European participation to the INTOR (INternational TOkamak Reactor) studies. This represents a collaborative effort among Europe, Japan; USA and USSR, under the auspices of IAEA, to design a major fusion experiment beyond the upcoming generation of large tokamaks. - The Project 2: ''Blanket Technology'' has the aim to investigate the behaviour of blanket materials in fusion conditions. - The Project 3: ''Materials Sorting and Development'' has the aim to assess the mechanical properties and radiation damage of standard and advanced materials suited for structures, in particular for application as first wall of the fusion reactors. - The Project 4: ''Cyclotron Operation and Experiments'' has the task to exploit a cyclotron to simulate radiation damages to materials in a fusion ambient

  11. ISTIMES project: status and outcomes

    Science.gov (United States)

    Cuomo, V.; Proto, M.; Soldovieri, F.

    2012-04-01

    ISTIMES is a project approved in the Seventh Framework Programme of the European Union under the Joint Call FP7-ICT-SEC-2007-1. It has a three years duration and will be completed within June 2012. According to the aims of the proposal, ISTIMES project has designed, assessed and developed a prototypical modular and scalable ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring; the specific application field was the reliability and safety of critical transport infrastructures, even if the modularity of the ISTIMES approach has permitted to extend it successfully to other critical infrastructures as dams. The continuous and fruitful involvement of end users (as Italian Civil Protection) allowed to develop applications focused on users needs. ISTIMES couples current monitoring of infrastructures with a high situational awareness during crises management, providing updated and detailed real and near real time information about the infrastructure status to improve decision support for emergency and disasters stakeholders. The system exploits an open network architecture that can accommodate a wide range of heterogeneous sensors, static and mobile, and can be easily scaled up to allow the integration of additional sensors and interfaces with other networks. It relies on state-of-the-art electromagnetic sensors, enabling a networking of terrestrial sensors, supported by specific satellite and airborne measurements. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance at different temporal and spatial scales, providing indexes and images of the critical transport infrastructures. The project has exploited, assessed and improved many different non-invasive technologies based on electromagnetic sensing as: Optic Fiber Sensors, Synthetic Aperture; Radar (SAR) satellite platform; Hyperspectral Spectroscopy; Infrared

  12. 1982 annual status report: thermonuclear fusion technology

    International Nuclear Information System (INIS)

    1982-01-01

    The objective of this programme is to study the technological problems related to ''Post Jet'' experimental machines and, in a longer range, to assess the engineering aspects of Fusion Power Reactor Plants. According to the decision taken by the Council of Ministers on the JRC multiannual programme (1980-1983), the work performed on 1982 concerns four projects, namely: The Project 1: ''Fusion Reactor Studies''concerns mainly the NET (Next European Torus) studies which have been continued in the framework of the European participation to INTOR (INternational TOkamak Reactor). This represents a collaborative effort to design a major fusion experiment beyond the-upcoming generation of large tokamaks. The Project 2: ''Blanket Technology'' has the aim to investigate the behaviour of blanket materials in fusion conditions. The Project 3: ''Materials Sorting and Development'' has the aim to assess the mechanical properties and radiation damage of standard and advanced materials suited for structures, in particular for application as first wall of the fusion reactors. The Project 4: ''Cyclotron Operation and Experiments''has the task to exploit a cyclotron to simulate radiation damages to materials in a fusion ambient

  13. 1980 Annual status report reactor safety

    International Nuclear Information System (INIS)

    1981-01-01

    The JRC reactor safety programme involves theoretical and experimental activities to analyse accidents and their consequences for LWRs and LMFBRs. The first project deals with the improvement and the application of methodologies for risk and reliability assessment. This activity involves the identification and modelling of accident sequences and events and the analysis of fault trees. In this project, the implementation of a centralized data bank system (European Reliability Data System) is foreseen, which should provide the information needed for risk assessment studies. In project 2 a major effort on LWRs is centered on the study of the loss-of-coolant accident following large, intermediate or small breaks of the primary circuit. These accidents are simulated out of pile in the LOBI facility. In project 3 a contribution is made to solve material problems and to provide data and calculation methods for end of life predictions of reactor components. It involves a contribution to the programme for the inspection of steel components (PISC) as well as the study of fracture and creep fatigue properties of stainless steel. In the project 4 and 5 a deterministic approach is adopted to solve some problems of large hypothetical accidents in an LMFBR. The calculation tools developed concern sodium thermohydraulics in fuel element bundles, fuel coolant interaction, whole core accident analysis, containment loading and response and post accident heat removal

  14. 1982 annual status report: reactor safety

    International Nuclear Information System (INIS)

    1982-01-01

    This report presents the projects of the Reactor Safety Program at the JRC: 1) Reliability and risk evolution; 2) LWR loss of coolant accident studies; 3) Primary system integrity; 4) LMFBR core accident initiation and transition phase; and, 5) LMFBR accident post disassembly phase

  15. Annual review of research projects 1987

    International Nuclear Information System (INIS)

    Keam, D.W.

    1989-04-01

    The Australian Radiation Laboratory is a national laboratory whose function is to assist the users of radiation, and those who regulate its use, to ensure that wherever radiation is encountered, it is managed in the safest possible way. In performing this function the Laboratory conducts a varied program of applied research in areas which have implications for occupational or public health. This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material is grouped into the following research fields: uranium, radon and its daughters; environmental radiation monitoring; radiopharmaceuticals and nuclear medicine; X-ray and clinical dosimetry; radionuclide metrology; non-ionising electromagnetic radiations; measurement standards in radiation dosimetry; and radiation effects in solids and gases. Refs., figs., tabs

  16. 1980 Annual status report: thermonuclear fusion technology

    International Nuclear Information System (INIS)

    1981-01-01

    According to the decisions taken by the Council of Ministers on the JRC multiannual programme (1980-83), the 1980 activity has been oriented toward four projects which cover a broad range of fields, namely: - the Project 1: 'Reactor Studies'. The main effort was oriented toward the NET/INTOR studies. JRC Ispra is acting as reference nucleus for NET preliminary design. For the moment being this work was made in support to the European participation to INTOR. In 1980 the conceptual design of a demonstration power reactor (FINTOR-D) was also achieved. - The Project 2: 'Blanket Technology' has the aim to investigate structural materials behaviour in fusion conditions. Items like tritium outgassing and permeation from structurals an materials compatibility were investigated. - The Projet 3: 'Material sorting and development'. Its aim is to assess mechanical properties and radiation damage of standard and advanced materials suited for reactor structures. - The Projet 4: 'Cyclotron construction and operation' has the task to install and exploit a cyclotron to simulate demages to materials in a fusion ambient

  17. Steam Generator Group Project. Annual report, 1982

    International Nuclear Information System (INIS)

    Clark, R.A.; Lewis, M.

    1984-02-01

    The Steam Generator Group Project (SGGP) is an NRC program joined by additional sponsors. The SGGP utilizes a steam generator removed from service at a nuclear plant (Surry 2) as a vehicle for research on a variety of safety and reliability issues. This report is an annual summary of progress of the program for 1982. Information is presented on the Steam Generator Examination Facility (SGEF), especially designed and constructed for this research. Loading of the generator into the SGEF is then discussed. The report then presents radiological field mapping results and personnel exposure monitoring. This is followed by information on field reduction achieved by channel head decontaminations. The report then presents results of a secondary side examination through shell penetrations placed prior to transport, confirming no change in generator condition due to transport. Decontamination of the channel head is discussed followed by plans for eddy current testing and removal of the plugs placed during service. Results of a preliminary profilometry examination are then provided

  18. Annual status report 31 December 1976

    International Nuclear Information System (INIS)

    1977-07-01

    The 1976 activities of the institute as related to fusion research are described in three sections. In the first section, the experimental division, work is reported on the long-term behavior of screw pinch plasmas in SPICA and the short-term behavior of the non-circular plasma is SP IV b. The second section, the theoretical division, describes the work done on magnetohydrodynamics of toroidal systems, on wave dynamics in inhomogeneous plasmas, transport phenomena in plasmas and on advanced fusion fuels. The third section, technology and engineering, summarizes the activities done in support of the experimental studies and the contribution of FOM members to the Joint European Torus project

  19. Status of the apeNEXT project

    CERN Document Server

    Ammendola, R.; Boucaud, Philippe; Cabibbo, N.; Di Carlo, F.; De Pietri, R.; Di Renzo, F.; Errico, W.; Fucci, A.; Guagnelli, M.; Kaldass, H.; Lonardo, A.; de Luca, S.; Micheli, J.; Morenas, V.; Pene, O.; Petronzio, R.; Palombi, F.; Pleiter, D.; Paschedag, N.; Rapuano, F.; De Riso, P.; Rossetti, D.; Salamon, A.; Salina, G.; Sartori, L.; Schifano, F.; Simma, H.; Tripiccione, R.; Vicini, P.; Boucaud, Ph.; 10.1016/S0920-5632(03)01755-9

    2003-01-01

    We present the current status of the apeNEXT project. Aim of this project is the development of the next generation of APE machines which will provide multi-teraflop computing power. Like previous machines, apeNEXT is based on a custom designed processor, which is specifically optimized for simulating QCD. We discuss the machine design, report on benchmarks, and give an overview on the status of the software development.

  20. 1980 Annual status report: super-SARA

    International Nuclear Information System (INIS)

    1981-01-01

    The essential tasks of the JRC for the SUPERSARA project during 1980 were therefore twofold: 1. Actuation of an international Task Force with which to: a. discuss in depth the test objectives and the relationships between the SSTP and the world mosaic of activities in the field of LWR fuel behaviour; b. establish a consensus test matrix; c. identify and discuss the major technological problems affecting the feasibility of attaining the consensus test objectives, especially for the boil-down SFD tests. A Task Force with these objectives was necessary in order to provide the elements for a Council decision on phase II. 2. Conservation of the rythm of the main contractor (UKAEA-Harwell) and subcontractors for the timely fabrication of loop components and the timely design of those new aspects of the plant necessary for the boil-down SFD tests

  1. Nuclear safety research project (PSF). 1999 annual report

    International Nuclear Information System (INIS)

    Muehl, B.

    2000-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZK) has been part of the Nuclear Safety Research Project (PSF) since 1990. The present annual report summarizes the R and D results of PSF during 1999. The research tasks cover three main topics: Light Water Reactor safety, innovative systems, and studies related to the transmutation of actinides. The importance of the Light Water Reactor safety, however, has decreased during the last year in favour of the transmutation of actinides. Numerous institutes of the research centre contribute to the PSF programme, as well as several external partners. The tasks are coordinated in agreement with internal and external working groups. The contributions to this report, which are either written in German or in English, correspond to the status of early/mid 2000. (orig.) [de

  2. 1981 Annual status report. Nuclear measurements

    International Nuclear Information System (INIS)

    1982-01-01

    The Nuclear Measurements programme is divided into two main projects, Nuclear Data on the one hand and Nuclear Reference Materials and Techniques on the other. In the former the JRC actions form part of world-wide sets of actions to establish reliable, and in many cases very precise, figures for important nuclear parameters - e.g. neutron interaction cross-sections, radio-nuclide half lives. In this work the Central Bureau for Nuclear Measurements (CBNM) pays particular attention to the specific needs of the Community and to complement similar actions undertaken in the laboratories belonging to the Member States. Concerning Nuclear Reference Materials and Techniques the actions are to provide materials to which analytical and other measurements carried out in the nuclear industry or by the nuclear community can be referred. The basic aim of the Nuclear measurement programme is therefore to develop nuclear metrology with special orientation towards satisfying the demands for basic nuclear data and for materials and methods or reference

  3. EBT-P project status report

    International Nuclear Information System (INIS)

    1983-11-01

    This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project

  4. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  5. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties (VP),'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A)

  6. Status of the CLIO project

    International Nuclear Information System (INIS)

    Miyoki, S; Uchiyama, T; Yamamoto, K

    2004-01-01

    The CLIO project involves the Cryogenic Laser Interferometer Observatory (CLIO) detector complex for gravitational wave detection and the Kamioka Laser Interferometric Strainmeter for the acquisition of geophysical data. CLIO has been constructed to demonstrate the feasibility of a future project, the Large-scale Cryogenic Gravitational wave Telescope (LCGT). It will utilize the low seismic and stable environment of the Kamioka mine as well as sapphire mirrors and suspension fibres at low temperature to reduce thermal noise. We designed CLIO to have a noise level limited by the thermal noise of sapphire mirrors and sapphire suspension fibres, which vary from 3 x 10 -19 m Hz -1/2 at 300 K to 2 x 10 -20 m Hz -1/2 at 20 K around 100 Hz. The strainmeter has already succeeded in monitoring the Earth's tidal motion with a strain sensitivity of 2 x 10 -12 . The seismic noise veto between these same-scale interferometers is expected to provide an effective means of data selection for the gravitational wave signal analysis, and the ground motion data obtained by the strainmeter will help to maintain the stable operation of CLIO

  7. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  8. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  9. U.S. Renewables Portfolio Standards: 2017 Annual Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-25

    Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2017 edition of the report presents historical data through year-end 2016 and projections through 2030. Key trends from this edition of the report include the following: -Evolution of state RPS programs: Significant RPS-related policy revisions since the start of 2016 include increased RPS targets in DC, MD, MI, NY, RI, and OR; requirements for new wind and solar projects and other major reforms to the RPS procurement process in IL; and a new offshore wind carve-out and solar procurement program in MA. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements. Nationally, the role of RPS policies has diminished over time, representing 44% of all U.S. RE capacity additions in 2016. However, within particular regions, RPS policies continue to play a central role in supporting RE growth, constituting 70-90% of 2016 RE capacity additions in the West, Mid-Atlantic, and Northeast. -Future RPS demand and incremental needs: Meeting RPS demand growth will require roughly a 50% increase in U.S. RE generation by 2030, equating to 55 GW of new RE capacity. To meet future RPS demand, total U.S. RE generation will need to reach 13% of electricity sales by 2030 (compared to 10% today), though other drivers will also continue to influence RE growth. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique state-specific policy designs. -REC pricing trends: Prices for renewable energy

  10. Status of the SPARC Project

    CERN Document Server

    Serafini, Luca; Alessandria, Franco; Bacci, Alberto; Bellaveglia, Marco; Bertolucci, Sergio; Biagini, Maria; Boni, Roberto; Boscolo, Ilario; Boscolo, Manuela; Broggi, Francesco; Castellano, Michele; Catani, Luciano; Chiadroni, Enrica; Cialdi, Simone; Cianchi, Alessandro; Ciocci, Franco; Clozza, Alberto; Dattoli, Giuseppe; De Martinis, Carlo; Di Pirro, Giampiero; Dipace, Antonio; Doria, Andrea; Dowell, David; Drago, Alessandro; Emma, Paul; Esposito, Adolfo; Ferrario, Massimo; Ficcadenti, L; Filippetto, Daniele; Flora, F; Fusco, Valeria; Gabrielli, E; Gallerano, Gian P; Gallo, Alessandro; Gatti, Giancarlo; Ghigo, Andrea; Giannessi, Luca; Giove, Dario; Giovenale, Emilio; Guiducci, Susanna; Incurvati, Maurizio; Levi, Decio; Ligi, Carlo; Limborg-Deprey, Cecile; Marcellini, Fabio; Maroli, Cesare; Mattioli, Mario; Mauri, Marco; Medici, G; Messina, Giovanni; Migliorati, Mauro; Mostacci, Andrea; Musumeci, Pietro; Nisoli, Mauro; Ottaviani, P L; Pagnutti, Simonetta; Palumbo, Luigi; Parisi, Giovanni; Pellegrino, Luigi; Pelliccia, Daniele; Petrarca, Massimo; Petrillo, Vittoria; Picardi, Luigi; Preger, Miro; Quattromini, Marcello; Renieri, Alberto; Ricci, Ruggero; Rome, Massimiliano; Ronci, G; Ronsivalle, Concetta; Rosenzweig, James E; Rosetti, Maurizio; Sabia, Elio; Sanelli, Claudio; Sassi, Mauro; Serio, Mario; Sgamma, Francesco; Spataro, Bruno; Stagira, Salvatore; Stecchi, Alessandro; Stella, Angelo; Tazzari, Sergio; Tazzioli, Franco; Thomas Palmer, Dennis; Torre, A; Vaccarezza, Cristina; Vescovi, Mario; Vicario, Carlo; Zucchini, Alberto; de Silvestri, Sandro

    2005-01-01

    The SPARC project has entered its installation phase at INFN-LNF: its main goal is the promotion of an R&D activity oriented to the development of a high brightness photoinjector to drive SASE-FEL experiments. The design of the 150 MeV photoinjector has been completed and the construction of its main components is in progress, as well as the design of the 12 m undulator. In this paper we will report on the installation and test of some major components, like the Ti:Sa laser system to drive the photo-cathode, the RF gun, the RF power system, as well as some test results on the RF deflector and 4th harmonic X-band cavity prototypes. Advancements in the control and beam diagnostics systems will also be reported, in particular on the emittance-meter device for beam emittance measurements in the drift space downstream the RF gun. Recent results on laser pulse shaping, obtained with two alternative techniques (DAZZLER and Liquid Crystal Mask), show the feasibility of producing 10 ps flat-top laser pulses in the...

  11. Status of LMFBR development project in Japan

    International Nuclear Information System (INIS)

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  12. Annual status report on the Uranium Mill Tailings Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  13. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA)

  14. Academy of Program/Project & Engineering Leadership Annual Publications

    Data.gov (United States)

    National Aeronautics and Space Administration — Academy of Program/Project & Engineering Leadership's Annual Report highlights the Academy's efforts to serve the NASA workforce's needs in adapting to the...

  15. The Stripa project. Annual report 1990

    International Nuclear Information System (INIS)

    1991-07-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The research and development division of the Swedish Nuclear Fuel and Waste Management Co. (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1990

  16. The Stripa project. Annual report 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) hsa been enstrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1988. (36 figs., 4 tabs.)

  17. The Stripa project annual report 1991

    International Nuclear Information System (INIS)

    1992-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1991

  18. Integrated Data Base: Status and waste projections

    International Nuclear Information System (INIS)

    Klein, J.A.

    1990-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. DOE low-level waste (LLW) is just one of the many waste types that are documented with the IDB. Summary-level tables and figures are presented illustrating historical and projected volume changes of DOE LLW. This information is readily available through the annual IDB publication. Other presentation formats are also available to the DOE community through a request to the IDB Program. 4 refs., 6 figs., 5 tabs

  19. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  20. Current status of the AUSTRON project

    International Nuclear Information System (INIS)

    Rauch, H.; Regler, M.; Lechner, R.E.; Weber, H.

    2001-01-01

    The current status of the AUSTRON spallation source project is described with reference to the need for neutrons in Europe and - due to a certain West-East imbalance of large research facilities - especially in Central Europe. A short overview about technical aspects of proton accelerator, rapid cycling synchrotron, storage ring, target and instrumentation is presented. (author)

  1. Status of the AFP Project in ATLAS

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00224260; The ATLAS collaboration

    2017-01-01

    Status of the AFP project in the ATLAS experiment is given. In 2016 one arm of the AFP detector was installed and first data have been taken. In parallel with integration of the AFP subdetector into the ATLAS TDAQ nad DCS, beam tests and preparations for the installation of the 2nd arm are performed.

  2. Pacific lamprey research and restoration project: annual report 1999; ANNUAL

    International Nuclear Information System (INIS)

    Close, David A.

    2001-01-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  3. Kalispel Resident Fish Project : Annual Report, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Todd; Olson, Jason

    2003-03-01

    In 2002 the Kalispel Natural Resource Department (KNRD) continued monitoring enhancement projects (implemented from 1996 to 1998) for bull trout (Salvelinus confluentus), westslope cutthroat (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Additional baseline fish population and habitat assessments were conducted, in 2002, in tributaries to the Pend Oreille River. Further habitat and fish population enhancement projects were also implemented in 2002.

  4. Status Report of Projects Activities at CERN

    CERN Document Server

    Missiaen, Dominique; Dobers, Tobias; Fuchs, Jean-Frederic; Gayde, Jean-Christophe; Jones, Mark; Mainaud Durand, Helene

    2014-01-01

    Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view.

  5. The EEE Project status and perspectives

    CERN Document Server

    Antolini, R; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D'Incecco, M; Fabbri, F L; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; La Rocca, P; Librizzi, F; Menghetti, H; Miozzi, S; Pappalardo,G S; Piragino, G; Riggi, F; Sartorelli, G; Sbarra, C; Selvi, M; Williams, C; Zichichi, A

    2007-01-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  6. FY 2014 LDRD Annual Report Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    Tomchak, Dena [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-02-01

    The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.

  7. Annual review of research projects 1980

    International Nuclear Information System (INIS)

    Keam, D.W.

    1981-11-01

    The Australian Radiation Laboratory is a national centre concerned with the public and occupational health aspects of the use of both ionising and non-ionising radiation. Thirty two projects which were in progress during 1980 are described

  8. The STRIPA project. Annual report 1986

    International Nuclear Information System (INIS)

    1987-08-01

    A summary of the Stripa Project phase 2 is given. The detailed informations describe crosshole techniques for the detection and characterization of fracture zones, the hydrological characterization of the Stripa site Part II, a three-dimensional migration experiment, borehole, shaft and tunnel sealing, the hydrogeochemical characterization of the Stripa groundwater and question of economy. A decision was taken in principale for an extension of the project into a third phase. (DG)

  9. Basalt Waste Isolation Project. Annual report, fiscal year 1979

    International Nuclear Information System (INIS)

    1979-11-01

    This project is aimed at examining the feasibility and providing the technology to design and construct a radwaste repository in basalt formations beneath and within the Hanford Site. The project is divided into seven areas: systems integration, geosciences, hydrologic studies, engineered barriers, near-surface test facility, engineering testing, and repository engineering. This annual report summarizes key investigations in these seven areas

  10. Annual colloquium 1976 of the project nuclear safety

    International Nuclear Information System (INIS)

    1976-11-01

    The present report gives the full text of the nine papers read during the annual colloquium 1976 of the Project Nuclear Safety at Karlsruhe Nuclear Research Centre, in which the main activities and findings of the project in 1976 are contained. (RW) [de

  11. Canadian Fusion Fuels Technology Project annual report 93/94

    International Nuclear Information System (INIS)

    1994-01-01

    The Canadian Fusion Fuels Technology Project exists to develop fusion technologies and apply them worldwide in today's advanced fusion projects and to apply these technologies in fusion and tritium research facilities. CFFTP concentrates on developing capability in fusion fuel cycle systems, in tritium handling technologies and in remote handling. This is an annual report for CFFTP and as such also includes a financial report

  12. Kalispel Resident Fish Project : Annual Report, 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Todd [Kalispel Natural Resource Department

    2009-07-08

    In 2008, the Kalispel Natural Resource Department (KNRD) continued to implement its habitat enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Baseline fish population and habitat assessments were conducted in Upper West Branch Priest River. Additional fish and habitat data were collected for the Granite Creek Watershed Assessment, a cooperative project between KNRD and the U.S. Forest Service Panhandle National Forest (FS) . The watershed assessment, funded primarily by the Salmon Recovery Funding Board of the State of Washington, will be completed in 2009.

  13. The Stripa project annual report 1984

    International Nuclear Information System (INIS)

    1985-07-01

    This is an autonomous OECD/NEA project relating to the final disposal of highly radioactive waste. Research is being performed in a granite formation 350 m below the ground surface. The first phase consists of three parts, namely hydrogeological and hydrogeochemical investigations in boreholes, tracer migration tests and large-scale tests of the behaviour of backfill material. The second phase includes the following investigations: detection and characterization of fracture zones, sealing of boreholes and shafts, hydrogoelogical characterization of the Stripa site and isotopic characterization of its groundwaters. The estimated cost of both phases is 111 MSEK and they are scheduled for completion in 1986. A summary of the progress of the project phase I and phase II is given in this report. (G.B.)

  14. Status Report Kuwait Nuclear Data Project

    Energy Technology Data Exchange (ETDEWEB)

    Farhan, A. [Kuwait Nuclear Data Center, Kuwait University, Kuwait (Kuwait)

    2013-08-15

    This report covers the Kuwaiti group's activities for the period April 2011 - January 2013. The Kuwait Group will continue its collaboration in order to fulfill its commitments. The Kuwait Nuclear Data Project has permanent responsibility for evaluating and updating ENSDF for A = 74 -80. The status of the mass chains is: - A = 74 (2006), - A = 75 (1999) {radical}, - A = 76 (1995) {radical}, - A = 77 (2012), - A = 78 (2009), - A = 79 (2002), - A = 80 (2005)

  15. West Valley Demonstration Project annual report

    International Nuclear Information System (INIS)

    1986-01-01

    In FY 1985 the most challenging goal of the Project to date, the start of verification testing of major subsystems of the Vitrification System, was accomplished. Individual testing of subsystems was completed in FY 1985 allowing for the start of integrated testing of all major portions of the Vitrification System. Other accomplishments during this period included completion of cleanup of the first of several former reprocessing cells, the first phase of testing and operation of the system which will solidify low-level liquid wastes and the beginning of construction to support installation of the Supernatant Treatment System which will be used to remove the radioactive fission products from the supernatant

  16. The Stripa project. Annual report 1989

    International Nuclear Information System (INIS)

    1990-05-01

    Participating countries in the Phase 3 of the Stripa project are Canada, Finland, Japan, Sweden, Switzerland, United Kingdom and the United States. The research activities in this third phase of the Stripa project are carried out under two headings: Fracture flow and nuclide transport; and groundwater flow path sealing. Under the heading 'Fracture flow and nuclide transport' the main objectives are: to predict groundwater flow and nuclide transport in a specific unexplored volume of the Stripa granite and make a comparison with data from field measurements. The comparison is made by means of an integrated approach with existing site characterization tools and methods, particularly those developed under Phases 1 and 2, this programme is referred to as the 'Site characterization and validation' programme; to continue the development of site assessment methods and strategies and, where found appropriate, apply them in later stages of the integrated site characterization exercise outlined above. This programme is referred to as 'Improvement of site assessment methods and concepts'. Under the heading 'Groundwater flow path sealing' the principal objectives are: to identify, select and evaluate sealing substances which promise to possess longterm chemical and mechanical stability and to demonstrate in field tests, by use of suitable methods and techniques, the effectiveness of such substances for the long-term sealing of groundwater flow paths in the Stripa granite. The total programme is referred to as 'Sealing of fractured rock'. (orig./HP)

  17. Project Radiation protection, Annual report 1994

    International Nuclear Information System (INIS)

    Ninkovic, M.M.

    1994-12-01

    According to the action plan for the period 1991-1995, the main objective of this project during 1994 was to provide operational basis, methods and procedures for solving the radiation protection problems that might appear under routine working conditions and handling of radiation sources. The aim was also to provide special methods for action in case of accidents that could affect the employed staff and the population. Overall activity was directed to maintaining and providing personnel, instrumentation, and methods for the following special radiation protection measures: operational control of the radiation field and contamination; calibration of the radiation and dosimetry instruments-secondary dosimetry metrology laboratory; instrumentation and measuring systems for radiation protection; control of environmental transfer of radioactive material; medical radiation protection [sr

  18. Status of ITER Cryodistribution and Cryoline project

    Science.gov (United States)

    Sarkar, B.; Vaghela, H.; Shah, N.; Bhattacharya, R.; Choukekar, K.; Patel, P.; Kapoor, H.; Srinivasa, M.; Chang, H. S.; Badgujar, S.; Monneret, E.

    2017-02-01

    The system of ITER Cryodistribution (CD) and Cryolines (CLs) is an integral interface between the Cryoplant systems and the superconducting (SC) magnets as well as Cryopumps (CPs). The project has progressed from the conceptual stage to the industrial stage. The subsystems are at various stages of design as defined by the project, namely, preliminary design, final design and formal reviews. Significant progresses have been made in the prototypes studies and design validations, such as the CL and cold circulators. While one of the prototype CL is already tested, the other one is in manufacturing phase. Performance test of two cold circulators have been completed. Design requirements are unique due the complexity arising from load specifications, layout constraints, regulatory compliance, operating conditions as well as several hundred interfaces. The present status of the project in terms of technical achievements, implications of the changes and the technical management as well as the risk assessment and its mitigation including path forward towards realization is described.

  19. Kalispel Resident Fish Project : Annual Report, 1995.

    Energy Technology Data Exchange (ETDEWEB)

    Maroney, Joseph; Donley, Christopher; Scott, Jason; Lockwood, Jr., Neil

    1997-06-01

    In 1995 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) initiated the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat trout (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat and population assessments were conducted in seven tributaries of the Box Canyon reach of the Pend Oreille River. Assessments were used to determine the types and quality of habitat that were limiting to native bull trout and cutthroat trout populations. Assessments were also used to determine the effects of interspecific competition within these streams. A bull trout and brook trout (Salvelinus fontinalis) hybridization assessment was conducted to determine the degree of hybridization between these two species. Analysis of the habitat data indicated high rates of sediment and lack of wintering habitat. The factors that contribute to these conditions have the greatest impact on habitat quality for the tributaries of concern. Population data suggested that brook trout have less stringent habitat requirements; therefore, they have the potential to outcompete the native salmonids in areas of lower quality habitat. No hybrids were found among the samples, which is most likely attributable to the limited number of bull trout. Data collected from these assessments were compiled to develop recommendations for enhancement measures. Recommendations for restoration include riparian planting and fencing, instream structures, as well as, removal of non-native brook trout to reduce interspecific competition with native salmonids in an isolated reach of Cee Cee Ah Creek.

  20. Canadian Fusion Fuels Technology Project annual report 93/94

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Canadian Fusion Fuels Technology Project exists to develop fusion technologies and apply them worldwide in today`s advanced fusion projects and to apply these technologies in fusion and tritium research facilities. CFFTP concentrates on developing capability in fusion fuel cycle systems, in tritium handling technologies and in remote handling. This is an annual report for CFFTP and as such also includes a financial report.

  1. Annual Status Report on Nationally Appropriate Mitigation Actions (NAMAs) 2012

    Energy Technology Data Exchange (ETDEWEB)

    Haensel, G.; Roeser, F.; Hoehne, N. [Ecofys, Utrecht (Netherlands); Van Tilburg, X.; Cameron, L. [ECN Policy Studies, Amsterdam (Netherlands)] (eds.)

    2012-11-15

    The development of Nationally Appropriate Mitigation Actions (NAMAs) has increased significantly over the last few years. The flexibility of the NAMA mechanism is widely regarded as an opportunity to deliver benefits that go far beyond greenhouse gas (GHG) emission reductions. Many developing countries are developing pilot NAMAs that deliver important insights into the challenges of, and opportunities for, NAMA development from a national perspective. A few countries are already a step ahead and experiences gained from pilot NAMA development are feeding into the formulation of national climate change policies in which NAMAs are becoming a key element. To maintain the momentum in NAMA development, clear signs at the international level are needed that developed countries will follow through with their financial commitments made under the Copenhagen Accord. Without this financial support, NAMAs will not be able to realise their full potential and induce transformational change. The Annual Status Report on NAMAs 2012 is a continuation of previously published NAMA Status Reports. The report presents an overview of the state of play of NAMAs and of support activities for NAMA development and implementation. A new feature of the Annual Status Report on NAMAs 2012 is that it is produced as a joint effort by several organizations that are closely involved in analysing and supporting NAMA development processes worldwide. The Annual Status Report on NAMAs 2012 is written by authors from Ecofys, the Energy research Centre of the Netherlands, the Center of Clean Air Policy (CCAP), the World Resources Institute (WRI) and Deutsche Gesellschaft fuer Internationale Zusammenarbeit (GIZ). In the section on 'Selected contributions on NAMAs', each organization discusses a specific topic of interest in relation to NAMA development that is closely related to their current NAMA activities or that is expected to provide 'food for thought' on potential ways forward for

  2. Project 'Colored solar collectors' - Annual report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Schueler, A.; Chambrier, E. De; Roecker, Ch.; Scartezzini, J. -L.

    2005-12-15

    regarding substrate cleaning, multiple dip-coating and dust protected thermal annealing. All aspects of the cyclic process for multilayer deposition has been optimized yielding homogenous coatings free of visible defects on a size scale suitable for demonstration (A4). One of the main technical risks of the project is now under control. (authors)

  3. Annual Energy Outlook 2009 with Projections to 2030

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-03-01

    The Annual Energy Outlook 2009 (AEO2009), prepared by the Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2030, based on results from EIA’s National Energy Modeling System (NEMS). EIA published an “early release” version of the AEO2009 reference case in December 2008.

  4. The INCA project: present status and outlook

    International Nuclear Information System (INIS)

    Aleksandrov, K.V.; Ammosov, V.V.; Chechin, V.A.; Chubenko, A.P.; Erlykin, A.D.; Ladygin, E.A.; Merzon, G.I.; Mukhamedshin, R.A.; Murashov, V.N.; Pavlyuchenko, V.P.; Ryabov, V.A.; Ryazhskaya, O.G.; Saito, T.; Sobolevskii, N.M.; Shchepetov, A.L.; Starkov, N.I.; Trostin, I.S.; Tsarev, V.A.; Wolfendale, A.; Zatsepin, G.T.; Zhdanov, G.B.; Zhukov, A.P.

    2002-01-01

    Scientific objectives, foundations, status, and outlook of the INCA Project are presented. Fundamentally new technique based on the ionization-neutron calorimeter (INCA) and designed to study local nearby sources of high-energy cosmic rays by direct measuring the spectrum and composition of the nuclear component in the 'knee' region and the spectrum of primary electrons in the energy range 0.1-10 TeV with the proton-background suppression factor up to 10 7 is discussed. Experimental data on exposition of the INCA prototypes to electron, pion, and proton beams at various energies and corresponding simulation results are presented. Prospects are considered

  5. Present status of the SRRC Project

    International Nuclear Information System (INIS)

    Chang, C.; Cheng, K.C.; Liu, Y.C.; Tseng, P.K.

    1985-01-01

    Upon the recommendation of the overseas Chinese scholars and the feasibility study group organized by the National Science Council, the government approved the establishment of the Synchrotron Radiation Research Center (SRRC) on July 9, 1983. The main goal of the SRRC project is to construct and operate an up-to-date 1 GeV synchrotron radiation source, with three beam lines for general experiments, in five to six years; to provide local scientists and returned scientists from abroad a facility to carry out frontier researches in both basic and applied science; and to elevate the technological capabilities of the related industries, universities, and research institutes through the construction of the machine. The background and present status of the project are discussed

  6. The Super-B project accelerator status

    CERN Document Server

    Biagini, M.E.; Boni, R; Boscolo, M; Demma, T; Drago, A; Esposito, M; Guiducci, S; Marcellini, F; Mazzitelli, G; Preger, M; Raimondi, P; Sanelli, C; Serio, M; Stecchi, A; Stella, A; Tomassini, S; Zobov, M; Bertsche, K; Brachmann, A; Cai, Y; Chao, A; DeLira, A; Donald, M; Fisher, A; Kharakh, D; Krasnykh, A; Li, N; MacFarlane, D; Nosochkov, Y; Novokhatski, A; Pivi, M.; Seeman, J; Sullivan, M; Wienands, U; Weisend, J; Wittmer, W; Koop, I; Levichev, E; Nikitin, S; Piminov, P; Sinyatkin, S; Shatilov, D; Bolzon, B; Brunetti, L; Jeremie, A; Baylac, M; DeConto, J M; Gomez, Y; Meot, F; Monseu, N; Tourres, D; Bonis, J.; Chehab, R; Le Meur, G; Mercier, B; Poirier, F; Prevost, C; Rimbault, C; Touze, F; Variola, A; Chance, A; Napoly, O; Bosi, F; Liuzzo, S; Paoloni, E; Bettoni, S

    2010-01-01

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e+e- (1036 cm-2 sec-1) asymmetric collider at the Y(4S) energy in the cm. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of “crab waist” sextupoles already successfully tested at the DANE -Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper

  7. Annual Report of the Integrated Status and Effectiveness Monitoring Program: Fiscal Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    Terraqua, Inc. (Wauconda, WA)

    2009-07-20

    This document was created as an annual report detailing the accomplishments of the Integrated Status and Effectiveness Monitoring Program (ISEMP) in the Upper Columbia Basin in fiscal year 2008. The report consists of sub-chapters that reflect the various components of the program. Chapter 1 presents a report on programmatic coordination and accomplishments, and Chapters 2 through 4 provide a review of how ISEMP has progressed during the 2008 fiscal year in each of the pilot project subbasins: the John Day (Chapter 2), Wenatchee/Entiat (Chapter 3) and Salmon River (Chapter 4). Chapter 5 presents a report on the data management accomplishments in 2008.

  8. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    International Nuclear Information System (INIS)

    Boliver, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP

  9. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

  10. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Vega, Leticia; Cox, Marlon R.; Aitchison, Lindsay T.; Lange, Kevin E.; Pensinger, Stuart J.; Meyer, Caitlin E.; Flynn, Michael; Jackson, W. Andrew; hide

    2014-01-01

    Next Generation Life Support (NGLS) is one of over twenty technology development projects sponsored by NASA's Game Changing Development Program. The NGLS Project develops selected life support technologies needed for humans to live and work productively in space, with focus on technologies for future use in spacecraft cabin and space suit applications. Over the last three years, NGLS had five main project elements: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, High Performance (HP) Extravehicular Activity (EVA) Glove, Alternative Water Processor (AWP) and Series-Bosch Carbon Dioxide Reduction. The RCA swing bed, VOR and HP EVA Glove tasks are directed at key technology needs for the Portable Life Support System (PLSS) and pressure garment for an Advanced Extravehicular Mobility Unit (EMU). Focus is on prototyping and integrated testing in cooperation with the Advanced Exploration Systems (AES) Advanced EVA Project. The HP EVA Glove Element, new this fiscal year, includes the generation of requirements and standards to guide development and evaluation of new glove designs. The AWP and Bosch efforts focus on regenerative technologies to further close spacecraft cabin atmosphere revitalization and water recovery loops and to meet technology maturation milestones defined in NASA's Space Technology Roadmaps. These activities are aimed at increasing affordability, reliability, and vehicle self-sufficiency while decreasing mass and mission cost, supporting a capability-driven architecture for extending human presence beyond low-Earth orbit, along a human path toward Mars. This paper provides a status of current technology development activities with a brief overview of future plans.

  11. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Pickering, Karen D.; Cox, Marlon; Towsend, Neil; Campbell, Colin; Flynn, Michael; Wheeler, Raymond

    2012-01-01

    Next Generation Life Support (NGLS) is one of several technology development projects sponsored by NASA s Game Changing Development Program. The NGLS Project is developing life support technologies (including water recovery and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processor (AWP). The RCA swing bed and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Advanced Extravehicular Mobility Unit, with focus on test article development and integrated testing in an Advanced PLSS in cooperation with the Advanced Extra Vehicular Activity (EVA) Project. An RCA swing-bed provides integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The VOR technology will significantly increase the number of pressure settings available to the space suit. Current space suit pressure regulators are limited to only two settings whereas the adjustability of the advanced regulator will be nearly continuous. The AWP effort, based on natural biological processes and membrane-based secondary treatment, will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water. This paper will provide a status of technology development activities and future plans.

  12. Fast Breeder Project status report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    A compilation of the papers read at the Status Report of the Fast Breeder Project at the Karlsruhe Nuclear Research Center on March 26, 1974 is presented. The first papers present a general survey of the present state of research and development work performed by the German, Belgian, and Netherlands research centers on the SNR 300 Prototype Fast Breeder Reactor (Kalkar Nuclear Power Station), on the SNR follow-on program, alternative fuels and coolants and basic problems, on work performed by industry with respect to the licensing procedure and construction of the SNR 300, and on commissioning and the planned conversion of KNK, the Compact Sodium Cooled Nuclear Reactor. The detailed papers deal with results elaborated at the institutes of GfK Karlsruhe, SCK/CEN Mol, RCN Petten, and TNO Apeldoorn. Most of these efforts have been concentrated upon fuel pin and materials development and on the physics and safety of fast reactors. The status report concludes with a reference to the future program under the Project. (U.S.)

  13. Krsko 2 Project Preparation and Status

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Bergant, R.; Zagar, T.

    2008-01-01

    The Government of the Republic of Slovenia has adopted a document 'Resolution on National Development Projects for the period 2007 - 2023' in October 2006. Among several projects which all support sustainable development of Slovenia, an option of a new nuclear power plant was proposed. Thus, the Slovenian Government showed obvious intention and direction of Slovenian future energetic situation. The supply of electricity has been sharpening in Slovenia in the last few years. Growing of gross domestic product (GDP) and approaching to the life standard of developed EU countries has caused increased consumption of electricity. Since domestic electricity production does not follow the increased consumption, Slovenia already imports nearly a quarter of its needed electricity. Slovenia would need 400 MW of installed electrical power now for covering of its base load needs only. Based on recent electricity consumption forecasts, Slovenia will need 800 MW of new electricity generation capacities by 2015 and 1500 MW by 2025 respectively. Besides high annual growth rate and high dependence on electricity import, a problem of relatively old power generation objects and realization of new energy and climate package for Europe exists. All together dictates our options for expansion of capacity production of the proposed Nuclear power plant Krsko 2. Experience and knowledge of light water pressurized reactor can be effectively used at NPP Krsko 2. Planned NPP Krsko 2 would have between 1100 and 1600 MW of installed electrical power. If the decision is taken in 2009, construction could start in 2013 and finish in 2017. (author)

  14. Status of the FRM-II project

    International Nuclear Information System (INIS)

    Boening, K.

    1994-01-01

    The new research reactor FRM-II at Garching near Munich is planned to become a high performance source of slow neutrons in Germany. Its design concept provides for a very compact reactor core cooled by light water and placed within a heavy water moderator tank, where a high thermal neutron flux will be obtained at only 20 MW power. - This paper begins with an overview over some of the essential design features and some more recent design modifications. It then reports on the status of the project, the most important event being a positive decision which the Bavarian State Government has made in January 1993 and which represented a green light for the project to enter the next project phase. Consequently, two official requests have been made by the Technical University of Munich, one for the nuclear licensing of the facility and the other for the so called 'Raumordnungsverfahren'. In this context the final version of the FRM-II safety report has been submitted to the nuclear licensing authority. (author)

  15. The LHC Project Status and Prospects

    CERN Document Server

    Faugeras, Paul E

    2001-01-01

    The Large Hadron Collider (LHC), CERN's future major facility for high-energy physics, has entered into the construction and preparation for installation phases. After recalling briefly the main machine design choices and challenges, one will review the progress of civil works for the machine and experimental areas and the status of the main LHC components, which are presently series-built and for some of them procured in kind through world-wide collaborations. Report will also be given on the full-scale prototype of an elementary LHC lattice cell, called String 2, which is being commissioned and used for optimising the installation and testing procedures of the LHC. The size and duration of the LHC Project, its intrinsic complexity and the large number of world-wide collaborations involved require rather elaborate project management tools, which will be shortly described. Finally, following the extended running of the LEP and the delay for emptying of the machine tunnel, a new planning for project completion...

  16. Current status of the IREN project

    International Nuclear Information System (INIS)

    Furman, W.I.

    1997-01-01

    A current status and a corrected time-schedule of the project of the new Intense Resonance Neutron pulsed source (IREN) realized in JINR (Dubna) for experiments dealing with fundamental and applied nuclear physics studies are discussed. This source is the upgraded variant of the existing IBR-30 pulsed booster. It consists of the 200 MeV electron linac and supplying by an electron beam the photo-neutron converter placed in the center of the very fast multiplying subcritical core. The existing buildings and beam infrastructure are planned to adopt for the new IREN source. The aim of the project is to improve essentially an energy resolution of the time-of-flight spectrometer and to increase twice (up to 10 15 n/sec) an integral neutron yield. An implementation of the IREN project has started in June 1994 with the planned end in December 1997. But due to mainly insufficient financing the approved time-schedule is shifted. Now most optimistic time of start-up of the neutron source is the end of 1999

  17. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  18. Annual energy outlook 1993 with projections to 2010

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Information Administration's (EIA's) Annual Energy Outlook 1993 (AEO93) presents forecasts for energy prices, supply, demand, and imports over the period 1990 to 2010. These projections take into account existing legislation, including the Energy Policy Act of 1992. Even though the world oil market remains relatively tight, the long-term outlook for oil prices has been revised downward since the Annual Energy Outlook 1992 as expectations for both the Organization of Petroleum Exporting Countries (OPEC) and non-OPEC production potential have been revised upward. Domestic natural gas prices are also expected to be lower than projected last year, in part because of a more optimistic outlook for drilling technology. Finally, lower growth in the demand for electricity is expected because of the Energy Policy Act of 1992, which mandates efficiency standards for new energy-using equipment. These are the most striking differences between last year's EIA evaluation of long-term energy market trends and this year's evaluation

  19. 20. Annual report. OECD Halden reactor project. 1979

    International Nuclear Information System (INIS)

    1981-01-01

    This is the Twentieth Annual Report on the OECD Halden Reactor Project, describing activities during 1979, the first year of the 1979-1981 Halden Agreement. Research work at the project is focussed on three areas: 1) In-core behaviour of reactor fuel, particularly reliability and safety aspects, which is studied through irradiation of test fuel elements. 2) Prediction, surveillance and control of fuel and core performance, for which models of fuel and core behaviour are developed. 3) Applications of process computers to power plant control, for which prototype software systems and hardware arrangements are developed

  20. Salt repository project closeout status report

    International Nuclear Information System (INIS)

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE's) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs

  1. Resident fish stock status above Chief Joseph and Grand Coulee dams : 2000 annual report; ANNUAL

    International Nuclear Information System (INIS)

    Lockwood, N.; McLellan, J.; Crossley, B.

    2001-01-01

    The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project

  2. 2. status colloquium of the project 'Applied ecology' (PAOe). Proceedings

    International Nuclear Information System (INIS)

    Breitenstein, A.; Scholz, W.; Waitzmann, M.; Zelesny, H.

    1994-01-01

    The 'Applied ecology' programme sponsors research on major subjects concerning application-oriented bases of nature conservation and environmental protection in the following sectors: 1. nature and landscape (succession research, scientific accompanying of measures restoring the natural condition of a landscape, nature conservation concepts and development of ecological paradigms); 2. ecotoxicology (further development and standardization of biological indication methods within the framework of the ecotoxicological register of effects of Baden-Wuertemberg, design of exposure models for forcasting long-term changes in Baden-Wuertemberg); 3. risk assessments and risk evaluations in environmental protection (selected ecological balances and development of ecological evaluation criteria).- On March 22nd and 23rd, 1994, the second status colloquium of the project ''Applied Ecology (PAOe)'' was held at Ettlingen. During this annual event, the results of 39 research projects in the above-mentioned major subject areas were presented and debated by 600 experts from science, administration and economy. This volume sums up the results of the research and demonstrates, at the same time, the range of the research projects sponsored under this scheme. (orig./VHE) [de

  3. StreamNet Project : Annual Report Fiscal Year 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

    2008-12-12

    Fiscal Year 2008 (FY-08) represents a transitional year for the StreamNet project. While the project continued to acquire/update, standardize, georeference and disseminate fish-related data for the state, some tribal and one federal fisheries agencies, it also took on several new initiatives and is anticipating new regional guidance on data needs. Passage of the Columbia Basin Accords caused an administrative change within the project, separating the work done by the Columbia River Inter-Tribal Fish Commission (CRITFC) out to a separate contract with BPA. This will change the structure of the StreamNet contract but not change the relationship with the StreamNet Library or data developed by CRITFC, and will likely increase the availability of tribal data to StreamNet due to increased funding for tribal data efforts. This change will take effect in FY-09. We also expect that data work will be adjusted in the future in response to executive level policy direction in the Columbia Basin based on efforts to establish priorities under a regional data management framework. Data development emphasis was shifted this year to place highest priority on data that support indicators of fish abundance for the focal species covered in the Status of the Resource (SOTR) report, as requested by the Columbia Basin Fish and Wildlife Authority (CBFWA) Data Management Framework Subcommittee. We instituted an XML based web service allowing direct access to data from the project database for CBFWA to update the SOTR report. The project also increased efforts to work with tribal fisheries managers to provide data related assistance and to include tribal data in the StreamNet database. A primary theme this year was exploring means to speed the flow of data. We had ongoing success in our strategic emphasis on increasing automation of data conversion through development of comprehensive database systems within our partner agencies, as outlined in our Vision and Strategic Plan. By assisting

  4. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    International Nuclear Information System (INIS)

    1997-01-01

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project

  5. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1996-01-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project

  6. Annual Energy Outlook 2016 With Projections to 2040

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-08-01

    The Annual Energy Outlook 2016 (AEO2016), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040. The projections, focused on U.S. energy markets, are based on results from EIA’s National Energy Modeling System (NEMS). NEMS enables EIA to make projections under alternative, internallyconsistent sets of assumptions. The analysis in AEO2016 focuses on the Reference case and 17 alternative cases. EIA published an Early Release version of the AEO2016 Reference case (including U.S. Environmental Protection Agency’s (EPA) Clean Power Plan (CPP)) and a No CPP case (excluding the CPP) in May 2016.

  7. Environmental monitoring annual report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Craig, P.M.

    1989-01-01

    The Fiscal Year 1988 Annual Report is the third in a series of semi-annual Tumulus Development Disposal Project data summary reports. The reporting schedule has been modified to correspond to the fiscal years and the subcontractor contract periods. This data summary spans the time from start of operations in June 1987 through the end of September 1988. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. This data is being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment for the TDDP. Approximately one year of pre-operational data were collected prior to operations beginning on April 11, 1988. Comparisons are made between pre- and post-operational data. No significant environmental impacts have been found since operations have begun. 10 refs., 21 figs., 22 tabs

  8. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  9. Umatilla River subbasin fish habitat improvement project. Annual report 1993

    International Nuclear Information System (INIS)

    Bailey, T.D.; Laws, T.S.

    1994-05-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) procurement of one access easement with a private landowner, (2) design, layout, and implementation of 3.36 miles of instream structure maintenance, (3) inspection and routine maintenance of 15.1 miles of fence, (4) revegetation along 3.36 miles of stream, (5) collection and summarization of physical and biological monitoring data, (6) extensive interagency coordination, and (7) environmental education activities with local high school students

  10. Proceedings of the first annual Nuclear Criticality Safety Technology Project

    International Nuclear Information System (INIS)

    Rutherford, D.A.

    1994-09-01

    This document represents the published proceedings of the first annual Nuclear Criticality Safety Technology Project (NCSTP) Workshop, which took place May 12--14, 1992, in Gaithersburg, Md. The conference consisted of four sessions, each dealing with a specific aspect of nuclear criticality safety issues. The session titles were ''Criticality Code Development, Usage, and Validation,'' ''Experimental Needs, Facilities, and Measurements,'' ''Regulation, Compliance, and Their Effects on Nuclear Criticality Technology and Safety,'' and ''The Nuclear Criticality Community Response to the USDOE Regulations and Compliance Directives.'' The conference also sponsored a Working Group session, a report of the NCSTP Working Group is also presented. Individual papers have been cataloged separately

  11. The status of US Teraflops-scale projects

    International Nuclear Information System (INIS)

    Mawhinney, R.D.

    1995-01-01

    The current status of United States projects pursuing Teraflops-scale computing resources for lattice field theory is discussed. Two projects are in existence at this time: the Multidisciplinary Teraflops Project, incorporating the physicists of the QCD Teraflops Collaboration, and a smaller project, centered at Columbia, involving the design and construction of a 0.8Teraflops computer primarily for QCD. ((orig.))

  12. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-03-30

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  13. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  14. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  15. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  16. Capital Improvement Program (CIP) Project Status

    Data.gov (United States)

    Montgomery County of Maryland — This dataset includes pertinent information relating to a capital project’s status administered by the Department of Transportation and the Department of General...

  17. Annual energy outlook 1999, with projections to 2020

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Annual Energy Outlook 1999 (AEO99) presents midterm forecasts of energy supply, demand, and prices through 2020 prepared by the Energy Information Administration (EIA). The projections are based on results from EIA`s National Energy Modeling System (NEMS). The report begins with an Overview summarizing the AEO99 reference case. The next section, Legislation and Regulations, describes the assumptions made with regard to laws that affect energy markets and discusses evolving legislative and regulatory issues. Issues in Focus discusses current energy issues--the economic decline in East Asia, growth in demand for natural gas, vehicle emissions standards, competitive electricity pricing, renewable portfolio standards, and carbon emissions. It is followed by the analysis of energy market trends. The analysis in AEO99 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present a summary of the reference case forecasts in units of oil equivalence and household energy expenditures. The AEO99 projections are based on Federal, State, and local laws and regulations in effect on July 1, 1998. Pending legislation and sections of existing legislation for which funds have not been appropriated are not reflected in the forecasts. Historical data used for the AEOI99 projections were the most current available as of July 31, 1998, when most 1997 data but only partial 1998 data were available.

  18. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    Dena Tomchak

    2014-03-01

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program proves its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.

  19. Plant Biology and Biogeochemistry Department annual project report 1999

    DEFF Research Database (Denmark)

    Jensen, A.; Gissel Nielsen, G.; Giese, H.

    2000-01-01

    The Department of Plant Biology and Biogeochemistry is engaged in basic and applied research to improve the scientific knowledge of developing new methods and technology for the future, environmentally benign industrial and agricultural production, thusexerting less stress and strain...... of Biomass, 3. DLF-Risø Biotechnology, 4. Plant Genetics and Epidemiology, 5. Biogeochemistry and 6. Plant Ecosystems and Nutrient Cycling. This electronicversion of the annual report from the Plant Biology and Biogeochemistry Department aims to provide information about the progress in our research. Each...... on the environment. This knowledge will lead to a greater prosperity and welfare for agriculture, industry and consumers in Denmark. The research approach in the Department is mainly experimental and the projects areorganized in six research programmes: 1. Plant-Microbe Symbioses, 2. Plant Products and Recycling...

  20. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  1. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  2. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1982-12-01

    Progress made during FY 1982, present status, and plans for FY 1983 are described for the following programs: radiological surveys and inclusion of vicinity properties; establishment of cooperative agreements; promulgation of standards for remedial action; acquisition of lands and materials; reprocessing of residual radioactive materials; National Environmental Policy Act (NEPA) documentation; program planning; technology development; remedial action; public participation; other federal agency activities; state and Indian tribe activities; and status of designated sites. Program funding is given

  3. Annual Energy Outlook 2013 with Projections to 2040

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-04-01

    The Annual Energy Outlook 2013 (AEO2013), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040, based on results from EIA’s National Energy Modeling System. The report begins with an “Executive summary” that highlights key aspects of the projections. It is followed by a “Legislation and regulations” section that discusses evolving legislative and regulatory issues, including a summary of recently enacted legislation and regulations, such as: Updated handling of the U.S. Environmental Protection Agency’s (EPA) National Emissions Standards for Hazardous Air Pollutants for industrial boilers and process heaters; New light-duty vehicle (LDV) greenhouse gas (GHG) and corporate average fuel economy (CAFE) standards for model years 2017 to 2025; Reinstatement of the Clean Air Interstate Rule (CAIR) after the court’s announcement of intent to vacate the Cross-State Air Pollution Rule (CSAPR); and Modeling of California’s Assembly Bill 32, the Global Warming Solutions Act (AB 32), which allows for representation of a cap-and-trade program developed as part of California’s GHG reduction goals for 2020. The “Issues in focus” section contains discussions of selected energy topics, including a discussion of the results in two cases that adopt different assumptions about the future course of existing policies, with one case assuming the elimination of sunset provisions in existing policies and the other case assuming the elimination of the sunset provisions and the extension of a selected group of existing public policies—CAFE standards, appliance standards, and production tax credits. Other discussions include: oil price and production trends in AEO2013; U.S. reliance on imported liquids under a range of cases; competition between coal and natural gas in electric power generation; high and low nuclear scenarios through 2040; and the impact of growth in natural gas

  4. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  5. Annual energy outlook 1998 with projections to 2020

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The Annual Energy Outlook 1998 (AEO98) is the first AEO with projections to 2020. Key issues for the forecast extension are trends in energy efficiency improvements, the effects of increasing production and productivity improvements on energy prices, and the reduction in nuclear generating capacity. Projections in AEO98 also reflect a greater shift to electricity market restructuring. Restructuring is addressed through several changes that are assumed to occur in the industry, including a shorter capital recovery period for capacity expansion decisions and a revised financial structure that features a higher cost of capital as the result of higher competitive risk. Both assumptions tend to favor less capital-intensive generation technologies, such as natural gas, over coal or baseload renewable technologies. The forecasts include specific restructuring plans in those regions that have announced plans. California, New York, and New England are assumed to begin competitive pricing in 1998. The provisions of the California legislation for stranded cost recovery and price caps are incorporated. In New York and New England, stranded cost recovery is assumed to be phased out by 2008.

  6. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan

  7. Projected entangled pair states: status and prospects

    Energy Technology Data Exchange (ETDEWEB)

    Verstraete, Frank [Universitaet Wien (Austria)

    2008-07-01

    We report on the progress made to extend the density matrix renormalization group to higher dimensions, discuss the underlying theory of projected entangled pair states (PEPS) and illustrate its potential on the hand of a few examples.

  8. Status report EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.; Kopecky, J.

    1990-08-01

    The European Fusion File (EFF) project and the associated European Activation File Project (EAF) are sponsored by the European Community's Fusion Technology Programme. The 1st programme is directed to the short-term needs of the NET team, which designs the Next European Torus, while the 2nd program is directed to long-term needs in the development of a Fusion Demonstration Reactor, in particular in connection with the study of low-activation materials. Various European laboratories participate in this project. The programme of the EFF-project is in its 2nd phase, after the successful completion of the EFF-1 data file. The emphasis on the 1st phase was on the improvement of the tritium breeding and neutron multiplication cross sections, while the 2nd phase emphasizes the improvement of a shielding data base. The progress of this 2nd phase is described. (author). 1 tab

  9. 1980 Annual status report: operation of the high flux reactor

    International Nuclear Information System (INIS)

    1981-01-01

    HFR Petten has been operated in 1980 in fulfilment of the 1980/83 JRC Programme Decision. Both reactor operation and utilization data have been met within a few percent of the goals set out in the annual working schedule, in support of a large variety of research programmes. Major improvements to experimental facilities have been introduced during the year and future modernization has been prepared

  10. Groundwater Annual Status Report for Fiscal Year 1998

    International Nuclear Information System (INIS)

    A. K. Stoker; A. S. Johnson; B. D. Newman; B. M. Gallaher; C. L. Nylander; D. B. Rogers; D. E. Broxton; D. Katzman; E. H. Keating; G. L. Cole; K. A. Bitner; K. I. Mullen; P. Longmire; S. G. McLin; W. J. Stone

    1999-01-01

    Groundwater protection activities and hydrogeologic characterization studies are conducted at LANL annually. A summary of fiscal year 1998 results and findings shows increased understanding of the hydrogeologic environment beneath the Pajarito Plateau and significant refinement to elements of the LANL Hydrogeologic Conceptual Model pertaining to areas and sources of recharge to the regional aquifer. Modeling, drilling, monitoring, and data collection activities are proposed for fiscal year 1999

  11. Groundwater Annual Status Report for Fiscal Year 1999

    International Nuclear Information System (INIS)

    Nylander, C.L.; Bitner, K.A.; Henning, K.; Johnson, A.S.; Keating, E.H.; Longmire, P.; Newman, B.D.; Robinson, B.; Rogers, D.B.; Stone, W.J.; Vaniman, D.

    2000-01-01

    Groundwater protection activities and hydrogeologic characterization studies are conducted at Los Alamos National Laboratory annually. A summary of fiscal year 1999 results and findings shows increased understanding of the hydrogeologic environment beneath the Pajarito Plateau and significant refinement to elements of the LANL. Hydrogeologic Conceptual Model pertaining to areas and sources of recharge to the regional aquifer. Modeling, drilling, monitoring, and data collection activities are proposed for fiscal year 2000

  12. Defense Standardization Program Status of Standardization Projects

    Science.gov (United States)

    1993-09-30

    11352 AT Fl 902 903 903 A AT N C 25GP TOTAL - I , DELINQUENT - 1 , STATUS CODES: A - 1 , G - 0 , Y - 0 , Z - 0 2610 F158 TRA-YB TIRE & RIM ASSOCIATION...MECHANICAL SH H5 923 924 924 A SH N C3950 N047 MIL-L-29250B LOADING JACK SYSTEM ISO CON YDV 02 932 943 943 A N 3950 TOTAL - 9 ,DELINQUENT - 5 ,STATUS CODES...SECURITY LABEL DC B4 BP 931 951 951 A SC OM 90 NS N DCPS 0012 INCORPORATE SONS PROTOCOLS INTO OSI ol B4 BP 932 954 954 A SC OM 90 NS N DCPS 0012 02 ISO

  13. Annual report on reactor safety research projects. Reporting period 2013. Progress report

    International Nuclear Information System (INIS)

    2013-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  14. Annual report on reactor safety research projects. Reporting period 2011. Progress report

    International Nuclear Information System (INIS)

    2011-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  15. Annual report on reactor safety research projects. Reporting period 2014. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. lt has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  16. Annual report on reactor safety research projects. Reporting period 2015. Progress report

    International Nuclear Information System (INIS)

    2015-01-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft tor Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are ·' prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. it has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  17. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  20. Tank Vapor Characterization Project: Annual status report for FY 1996

    International Nuclear Information System (INIS)

    Silvers, K.L.; Fruchter, J.S.; Huckaby, J.L.; Almeida, T.L.; Evans, J.C. Jr.; Pool, K.H.; Simonen, C.A.; Thornton, B.M.

    1997-01-01

    In Fiscal Year 1996, staff at the Vapor Analytical Laboratory at Pacific Northwest National Laboratory performed work in support of characterizing the vapor composition of the headspaces of radioactive waste tanks at the Hanford Site. Work performed included support for technical issues and sampling methodologies, upgrades for analytical equipment, analytical method development, preparation of unexposed samples, analyses of tank headspaces samples, preparation of data reports, and operation of the tank vapor database. Progress made in FY 1996 included completion and issuance of 50 analytical data reports. A sampling system comparison study was initiated and completed during the fiscal year. The comparison study involved the vapor sampling system (VSS), a truck-based system, and the in situ vapor sampling system (ISVS), a cart-based system. Samples collected during the study were characterized for inorganic, permanent gases, total non-methane organic compounds and organic speciation by SUMMA trademark and TST methods. The study showed comparable sampling results between the systems resulting in the program switching from the VSS to the less expensive ISVS methodology in late May 1996. A temporal study was initiated in January 1996 in order to understand the influences seasonal temperatures changes have on the vapors in the headspace of Hanford waste tanks. A holding time study was initiated in the fourth quarter of FY 1996. Samples were collected from tank S-102 and rushed to the laboratory for time zero analysis. Additional samples will be analyzed at 1, 2, 4, 8, 16, and 32 weeks

  1. Status of safety at Areva group facilities. 2007 annual report

    International Nuclear Information System (INIS)

    2007-01-01

    This report describes the status of nuclear safety and radiation protection in the facilities of the AREVA group and gives information on radiation protection in the service operations, as observed through the inspection programs and analyses carried out by the General Inspectorate in 2007. Having been submitted to the group's Supervisory Board, this report is sent to the bodies representing the personnel. Content: 1 - A look back at 2007 by the AREVA General Inspector: Visible progress in 2007, Implementation of the Nuclear Safety Charter, Notable events; 2 - Status of nuclear safety and radiation protection in the nuclear facilities and service operations: Personnel radiation protection, Event tracking, Service operations, Criticality control, Radioactive waste and effluent management; 3 - Performance improvement actions; 4 - Description of the General Inspectorate; 5 - Glossary

  2. Status of the CP-PACS Project

    International Nuclear Information System (INIS)

    Ukawa, A.

    1995-01-01

    The CP-PACS Project, which started in April 1992, is a five-year plan to develop a massively parallel computer for carrying out research in computational physics with primary emphasis on lattice QCD. This article describes the architectural design of the CP-PACS computer, the entire computing system including the front end and mass storage, and results of benchmarks for the expected performance for lattice QCD applications. ((orig.))

  3. The CHEMVAL 2 project - status report

    International Nuclear Information System (INIS)

    Read, D.

    1993-01-01

    This paper summarizes the progress made during the first year of CHEMVAL 2, a coordinated four year research programme for evaluating and enhancing chemical models used in radiological risk assessment. Eighteen organisations from nine countries are currently participating, several of whom are also undertaking related experimental studies within the Commission of European Communities (CEC) MIRAGE Project (Migration of Radionuclides in the geosphere) - Third Phase. 16 refs., 3 figs

  4. NGNP Project 2011 Status and Path Forward

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-12-01

    High Temperature Gas Reactor (HTGR) technology can play an important role in the United States’ energy future by extending the use of nuclear energy for non-electricity energy production missions as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the co-production of process heat and electricity provides safe and reliable energy for these sectors in an environmentally responsible manner. The safety case for the modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGR with major industrial facilities. The NGNP Project at the Idaho National Laboratory has been working toward an objective of commercializing the HTGR technology under DOE direction since 2006. The Project is undergoing a quantum shift in direction and scope as a result of recent DOE decisions. This paper summarizes where the Project has been, where it is at the time of this writing and what is needed in future activities to commercialize HTGR technology.

  5. Annual energy outlook 1994: With projections to 2010

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The Annual Energy Outlook 1994 (AEO94) presents the midterm energy forecasts of the Energy Information Administration (EIA). This year`s report presents projects and analyses of energy supply, demand, and prices through 2010, based for the first time on results from the National Energy Modeling System (NEMS). NEMS is the latest in a series of computer-based energy modeling systems used over the past 2 decades by EIA and its predecessor organization, the Federal Energy Administration, to analyze and forecast energy consumption and supply in the midterm period (about 20 years). Quarterly forecasts of energy supply and demand for 1994 and 1995 are published in the Short-Term Energy Outlook (February 1994). Forecast tables for 2000, 2005, and 2010 for each of the five scenarios examined in the AEO94 are provided in Appendices A through E. The five scenarios include a reference case and four additional cases that assume higher and lower economic growth and higher and lower world oil prices. Appendix F provides detailed comparisons of the AEO94 forecasts with those of other organizations. Appendix G briefly described the NEMS and the major AEO94 forecast assumptions. Appendix H summarizes the key results for the five scenarios.

  6. Annual energy outlook 1997 with projections to 2015

    International Nuclear Information System (INIS)

    1996-12-01

    The Annual Energy Outlook 1997 (AEO97) presents midterm forecasts of energy supply, demand, and prices through 2015 prepared by the Energy Information Administration (EIA). These projections are based on results of EIA's National Energy Modeling System (NEMS). This report begins with a summary of the reference case, followed by a discussion of the legislative assumptions and evolving legislative and regulatory issues. ''Issues in Focus'' discusses emerging energy issues and other topics of particular interest. It is followed by the analysis of energy market trends. The analysis in AEO97 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present summaries of the reference case forecasts in units of oil equivalence and household energy expenditures. Twenty-three other cases explore the impacts of varying key assumptions in NEMS--generally, technology penetration, with the major results shown in Appendix F. Appendix G briefly describes NEMS and the major AEO97 assumptions, with a summary table. 114 figs., 22 tabs

  7. Basalt Waste Isolation Project. Annual report, fiscal year 1980

    International Nuclear Information System (INIS)

    1980-11-01

    During this fiscal year the information available in the fields of geology and hydrology of the Columbia Plateau was consolidated and two reports were issued summarizing this information. In addition, the information on engineered barriers was consolidated and a report summarizing the research to date on waste package development and design of borehole seals was prepared. The waste package studies, when combined with the hydrologic integration, revealed that even under extreme disruptive conditions, a repository in basalt with appropriately designed waste packages can serve as an excellent barrier for containment of radionuclides for the long periods of time required for waste isolation. On July 1, 1980, the first two heater tests at the Near-Surface Test Facility were started and have been successfully operated to this date. The papers on the Near-Surface Test Facility section of this report present the results of the equipment installed and the preliminary results of the testing. In October 1979, the US Department of Energy selected the joint venture of Kaiser Engineers/Parsons Brinckerhoff Quade and Douglas, Inc., to be the architect-engineer to produce a conceptual design of a repository in basalt. During the year, this design has progressed and concept selection has now been completed. This annual report presents a summary of the highlights of the work completed during fiscal year 1980. It is intended to supplement and summarize the nearly 200 papers and reports that have been distributed to date as a part of the Basalt Waste Isolation Project studies

  8. Annual energy outlook 1997 with projections to 2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The Annual Energy Outlook 1997 (AEO97) presents midterm forecasts of energy supply, demand, and prices through 2015 prepared by the Energy Information Administration (EIA). These projections are based on results of EIA`s National Energy Modeling System (NEMS). This report begins with a summary of the reference case, followed by a discussion of the legislative assumptions and evolving legislative and regulatory issues. ``Issues in Focus`` discusses emerging energy issues and other topics of particular interest. It is followed by the analysis of energy market trends. The analysis in AEO97 focuses primarily on a reference case and four other cases that assume higher and lower economic growth and higher and lower world oil prices than in the reference case. Forecast tables for these cases are provided in Appendixes A through C. Appendixes D and E present summaries of the reference case forecasts in units of oil equivalence and household energy expenditures. Twenty-three other cases explore the impacts of varying key assumptions in NEMS--generally, technology penetration, with the major results shown in Appendix F. Appendix G briefly describes NEMS and the major AEO97 assumptions, with a summary table. 114 figs., 22 tabs.

  9. Present status of the Zavratec remediation project

    International Nuclear Information System (INIS)

    Zeleznik, N.; Stepisnik, M.; Mele, I.

    1997-01-01

    In 1992 the responsibility for the remediation of the temporary storage of radioactive waste near Zavratec was assigned to the Agency for Radwaste Management. The project was divided into two phases. First, in a study, different options for remediation were considered. In the second phase, performed in 1996, the measurements, inventorying and repacking of radioactive waste were carried out. Simultaneously with these activities a programme for covering public relations was prepared. One of the results of the public relation campaign is also a 15-minute video film, which was prepared from documentary material recorded during remedial activities, and will be presented here. (author)

  10. The MAJORANA Project: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Steven Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-09

    This series of slides presents the topic under the following aspects: ββ sensitivity, underground laboratory, shield, monoliths, strings, detectors, electroformed small parts, and background. Assembly and construction are proceeding at Sanford Davis Campus laboratory. Based on assays, material backgrounds are projected to meet cleanliness goals. Module 1 is complete. Electroformed copper has just been completed at SURF and PNNL. The shield is nearly complete. Successful reduction and refinement of enrGe has taken place with 98% yield. AMTEK (ORTEC) has produced 27 kg within 32 detectors from the reduced/refined enrGe; 30 of these are underground at SURF being assembled into strings.

  11. The low energy booster project status

    International Nuclear Information System (INIS)

    Tuttle, G.W.

    1993-05-01

    In order to achieve the required injection momentum, the Superconducting Super Collider (SSC) has an accelerator chain comprised of a Linear Accelerator and three synchrotrons. The Low Energy Booster (LEB) is the first synchrotron in this chain. The LEB project has made significant progress in the development of major subsystems and conventional construction. This paper briefly reviews the performance requirements of the LEB and describes significant achievements in each of the major subsystem areas. Highlighted among these achievements are the LEB foreign collaborations with the Budker Institute of Nuclear Physics (BINP) located in Novosibirsk, Russia

  12. Status report on the NESC1 project

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R C; McGarry, D [European Commission Joint Research Centre Petten (Netherlands); Wintle, J [AEA Technology, Risley (United Kingdom); Hemsworth, B [HSE Nuclear Installations Inspectorate Bootle, Merseyside (United Kingdom)

    1997-09-01

    The Spinning Cylinder Project is the first joint international collaboration of the Network for Evaluating Steel Components (NESC) and is based around a large scale spinning cylinder test. This paper summarizes how the test conditions were defined and analysed, and how a method for detecting the moment of crack growth was developed. Now that the test has been successfully completed, the complex evaluation procedures can be commenced. The results of the test will constitute an important international benchmark for the understanding and validation of fracture methodologies used by the nuclear industry to assess reactor pressure vessels against pressurized thermal shock. (author). 13 refs, 3 figs.

  13. Status of the Multipurpose Canister (MPC) Project

    International Nuclear Information System (INIS)

    Hopper, J.P.

    1996-01-01

    The multipurpose canister (MPC) project represents a cornerstone of the current U.S. Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) program for handling spent nuclear fuel. The MPC and associated support equipment is being designed to accommodate the requirements for not only storage and transport but also for the specified disposal requirements of the mined geologic repository system. The phase 1 design effort for the MPC system, being performed by the Westinghouse team on behalf of TRW Environmental Safety Systems (TESS), the OCRWM management ampersand operating (M ampersand O) contractor, is on schedule for delivery of completed safety analysis reports (SARs) in April 1996

  14. 1980 Annual status report: provision of scientific and technical services

    International Nuclear Information System (INIS)

    1981-01-01

    Two kinds of objectives are pursued at the JRC in direct support of the various General Directorates of the Commission: Technical Evaluations where system analysis techniques are mainly employed and Technical Assistance where laboratory measurement, technical expertises and management of projects are provided

  15. Annual Energy Outlook 2011 with Projections to 2035

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-04-01

    The projections in the Energy Information Administration's (EIA) Annual Energy Outlook 2011 (AEO2011) focus on the factors that shape the U.S. energy system over the long term. Under the assumption that current laws and regulations remain unchanged throughout the projections, the AEO2011 Reference case provides the basis for examination and discussion of energy production, consumption, technology, and market trends and the direction they may take in the future. It also serves as a starting point for analysis of potential changes in energy policies. But AEO2011 is not limited to the Reference case. It also includes 57 sensitivity cases (see Appendix E, Table E1), which explore important areas of uncertainty for markets, technologies, and policies in the U.S. energy economy. Key results highlighted in AEO2011 include strong growth in shale gas production, growing use of natural gas and renewables in electric power generation, declining reliance on imported liquid fuels, and projected slow growth in energy-related carbon dioxide (CO2) emissions even in the absence of new policies designed to mitigate greenhouse gas (GHG) emissions. AEO2011 also includes in-depth discussions on topics of special interest that may affect the energy outlook. They include: impacts of the continuing renewal and updating of Federal and State laws and regulations; discussion of world oil supply and price trends shaped by changes in demand from countries outside the Organization for Economic Cooperation and Development or in supply available from the Organization of the Petroleum Exporting Countries; an examination of the potential impacts of proposed revisions to Corporate Average Fuel Economy standards for light-duty vehicles and proposed new standards for heavy-duty vehicles; the impact of a series of updates to appliance standard alone or in combination with revised building codes; the potential impact on natural gas and crude oil production of an expanded offshore resource base

  16. Status of PACMAN Project at CERN

    CERN Document Server

    Catalan-Lasheras, Nuria; Modena , Michele

    2015-01-01

    Though the Large Hadron Collider (LHC) at CERN is just at the start of a program expected to run for 20 additional years, CERN is studying the next generation of colliders, like the Compact Linear Collider (CLIC). This project proposes an electron-positron collider with a length close to 50 km and with a centre of mass energy of 3 TeV at the collision point. One of the main challenges is the sub-micrometric size of the beams, down to a few nanometres at the interaction point. As a consequence, the accelerator will require unprecedented nanometric tolerances of beam alignment. A series of several thousands components will have to be assembled, aligned at the micrometre level and most critically, stabilized actively at the nanometre level. PACMAN, a study on Particle Accelerator Components Metrology and Alignment to the Nanometre scale, is a Marie Curie Program supported by the European Commission (FP7 Program), creating a network of 16 Academic and Industrial Partners. The project is hosted at CERN and it offe...

  17. Status of the NICA project at JINR

    Directory of Open Access Journals (Sweden)

    Kekelidze Vladimir

    2017-01-01

    Full Text Available The NICA (Nuclotron-based Ion Collider fAcility project is now under active realization at the Joint Institute for Nuclear Research (JINR, Dubna. The main goal of the project is a study of hot and dense strongly interacting matter in heavy-ion (up to Au collisions at the center-of-mass energies up to 11 GeV per nucleon. Two modes of operation are foreseen, collider mode and extracted beams, with two detectors: MPD and BM@N. The both experiments are in preparation stage. An average luminosity in the collider mode is expected to be 1027 cm−2 s−1 for Au (79+. Extracted beams of various nuclei with maximum momenta of 13 GeV/c (for protons will be available. A study of spin physics with extracted and colliding beams of polarized deuterons and protons at energies up to 27 GeV (for protons is foreseen with the NICA facility. The proposed program allows one to search for possible signs of phase transitions and critical phenomena as well as to shed light on the problem of the nucleon spin structure.

  18. Hanford Waste Vitrification Project overview and status

    International Nuclear Information System (INIS)

    Swenson, L.D.; Smets, J.L.

    1993-01-01

    The Hanford Waste Vitrification Project (HWVP) is being constructed at the US DOE's Hanford Site in Richland, WA. Engineering and design are being accomplished by Fluor Daniel Inc. in Irvine, CA. Technical input is furnished by Westinghouse Hanford Co. and construction management services by UE ampersand C-Catalytic Inc. The HWVP will immobilize high level nuclear waste in a glass matrix for eventual disposal in the federal repository. The HWVP consists of several structures, the major ones being the Vitrification Building, the Canister Storage Building, fan house, sand filter, waste hold tank, pump house, and administration and construction facilities. Construction started in April 1992 with the clearing and grubbing activities that prepared the site for fencing and construction preparation. Several design packages have been released for procurement activities. The most significant package release is for the Canister Storage Building, which will be the first major structure to be constructed

  19. NICA project at JINR: status and prospects

    International Nuclear Information System (INIS)

    Kekelidze, V.D.

    2017-01-01

    The project NICA (Nuclotron-based Ion Collider fAcility) is aimed to study hot and dense baryonic matter in heavy-ion collisions in the energy range up to 11.0 AGeV . The plan of NICA accelerator block development includes an upgrade of the existing superconducting (SC) synchrotron Nuclotron and construction of the new injection complex, SC Booster, and SC Collider with two interaction points (IP). The heavy-ion collision program will be performed with the fixed target experiment Baryonic Matter at Nuclotron (BM@N) at the beam extracted from the Nuclotron, and with Multi-Purpose Detector (MPD) at the first IP of NICA Collider. Investigation of nucleon spin structure and polarization phenomena is foreseen with the Spin Physics Detector (SPC) at the second IP of the Collider.

  20. Status of the NICA project at JINR

    Directory of Open Access Journals (Sweden)

    Kekelidze V.

    2016-01-01

    Full Text Available The project NICA (Nuclotron-based Ion Collider fAcility is aimed to study hot and dense baryonic matter in heavy ion collisions in the energy range up to √sNN = 11 GeV, and to study nucleon spin structure in polarized proton and deuteron collisions in the energy range up to √s = 27 GeV. The heavy ion program will be performed at the Nuclotron extracted beams with the BM@N (Baryonic Matter at Nuclotron set-up and with the MPD (MultiPurpose Detector at the NICA collider with the average luminosity of L = 1027 cm−2s−1 (for 197Au79+. The spin physics will be studied with the SPD (Spin Physics Detector at the NICA collider.

  1. Present status of the KISS project

    Science.gov (United States)

    Miyatake, H.; Wada, M.; Watanabe, X. Y.; Hirayama, Y.; Schury, P.; Ahmed, M.; Ishiyama, H.; Jeong, S. C.; Kakiguchi, Y.; Kimura, S.; Moon, J. Y.; Mukai, M.; Oyaizu, M.; Park, J. H.

    2018-04-01

    KISS project aims at finding an astrophysical condition for synthesizing r-process heavy element isotopes, which are characterized as the third peak in the solar abundance pattern. This is an experimental challenge in nuclear physics to measure ground and isomeric state properties of unknown nuclei around the region of N=126 isotones. So far we have constructed and developed new type of mass separation system, KISS (KEK Isotope Separation System) and performed measurements of lifetimes and hyperfine structures of some platinum and iridium neutron-rich radioactive isotopes by applying multi-nucleon transfer reactions and in-gas laser ionization and spectroscopy (IGLIS) methods. In this report, recent physics results, updated KISS performance, and future's research plan including a challenge of a systematic mass measurement with MRTOF (Multi-Reflection Time-Of-Flight mass spectrograph) are presented.

  2. Regional Assessment of Supplementation Project. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year`s objectives and recommendations for future tasks are contained in this report.

  3. Monitored Retrievable Storage (MRS) facility project status

    International Nuclear Information System (INIS)

    Milner, R.A.; Trebules, V.W.; Blandford, J.B.

    1994-01-01

    1993 has been yet another year of major change in the Monitored Retrievable Storage (MRS) project. The change in administration has brought a new Secretary of Energy to the Department. Secretary O'Leary has brought a strong leadership background and fresh ideas to address the Department's many complex challenges, including the Civilian Radioactive Waste Management System (CRWMS). Dr. Daniel Dreyfus was named Director of the Office of Civilian Radioactive Waste Management. Mr. Richard Stallings has been named, as the new, Nuclear Waste Negotiator under the Nuclear Waste Policy Act, Amendments of 1987. The overall mission of the Office of Civilian Radioactive Waste Management (OCRWM) has not changed. OCRWM is tasked with finding technically sound, environmentally responsible and economically viable solutions to spent nuclear fuel and high-level radioactive waste storage and disposal

  4. Medical Data Architecture (MDA) Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  5. Status of national programmes on fast reactors 1998/99. 32nd annual meeting. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Over the past 32 years, the IAEA has actively encouraged and advocated international cooperation in fast reactor technology. The present publication contains information on the status of fast reactor development and on worldwide activities in this advanced nuclear power technology during 1998/1999, as reported at the 32. annual meeting of the International Working Group on Fast Reactors. It is intended to provide information regarding the current status of LMFR development in IAEA Member States.

  6. Status of national programmes on fast reactors 1998/99. 32nd annual meeting. Working material

    International Nuclear Information System (INIS)

    1999-01-01

    Over the past 32 years, the IAEA has actively encouraged and advocated international cooperation in fast reactor technology. The present publication contains information on the status of fast reactor development and on worldwide activities in this advanced nuclear power technology during 1998/1999, as reported at the 32. annual meeting of the International Working Group on Fast Reactors. It is intended to provide information regarding the current status of LMFR development in IAEA Member States

  7. Ferrocyanide safety project ferrocyanide aging studies FY 1995 annual report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Alderson, E.V.; Hallen, R.T.

    1995-09-01

    This annual report gives the results of the work conducted by the Pacific Northwest Laboratory in FY 1995 on Task 3 of the Ferrocyanide Safety Project, Ferrocyanide Aging Studies. Aging refers to the dissolution and hydrolysis of simulated Hanford ferrocyanide waste in alkaline aqueous solutions by radiolytic and chemical means. The ferrocyanide simulant primarily used in these studies was dried In-Farm-1B, Rev. 7, prepared by Westinghouse Hanford Company to simulate the waste generated when the In-Farm flowsheet was used to remove radiocesium from waste supernates in single-shell tanks at the Hanford Site. In the In-Farm flowsheet, nickel ion and ferrocyanide anion were added to waste supernates to precipitate sodium nickel ferrocyanide, Na 2 NiFe(CN) 6 , and co-precipitate radiocesium. Once the radiocesium was removed, supernates were pumped from the tanks, and new wastes from cladding removal processes or from evaporators were added. These new wastes were typically highly caustic, having hydroxide ion concentrations of over 1 M and as high as 4 M. The Aging Studies task is investigating reactions this caustic waste may have had with the precipitated ferrocyanide waste in a radiation field. In previous Aging Studies research, Na 2 NiFe(CN) 6 in simulants was shown to dissolve in basic solutions, forming insoluble Ni(OH) 2 and soluble Na 4 Fe(CN) 6 . The influence on solubility of base strength, sodium ion concentration, anions, and temperature was previously investigated. The results may indicate that even ferrocyanide sludge that did not come into direct contact with highly basic wastes may also have aged significantly

  8. Status of the JEF and EFF projects

    International Nuclear Information System (INIS)

    Nordborg, C.; Gruppelaar, H.

    1991-05-01

    Following positive experiences gained with the 1st version of JEF (Joint Evaluated File) library, which was distributed to NEA Data Bank member countries in 1985, a significantly improved version, JEF-2.0 (in ENDF-6 format), was distributed for testing end February 1990. It is planned to compile, middle 1991, following intensive benchmark testing, a version of JEF-2 library for general use. EFF (European Fusion File) and associated EAF (European Activation File) projects are sponsored by the European Community's Fusion Technology Programme. The programme of EFF is in its 2nd phase, after the successful completion of the EFF-1 data file. This phase has been defined 1989-1991 and the emphasis is on improvement of a shielding data base. The EFF-2 library will be ready end 1991 and contain new evaluations for most of the important fusion reactor materials. A follow-up programme, including benchmark testing has been defined. Creation of a joint JEF-EFF data file has been agreed It will be compiled during 1992. (author). 20 refs.; 2 figs.; 1 tab

  9. Status of the Cracow electrostatic accelerator project

    International Nuclear Information System (INIS)

    Hebenstreit, J.R.; Kopczynski, J.P.

    1981-01-01

    The range of nuclear reaction measurements and applied interdisciplinary research performed earlier with accelerated particles in this Institute were strongly limited the accelerators being at disposal: an open air 1 MV Van de Graaff generator in the Jagellonian University and the cyclotron U-120 in the neighboring Institute of Nuclear Physics. Due to financial problems connected with buying a new ready accelerator, an approval was obtained for carrying out a detailed design study on condition that the accelerator should be constructed in the Institute and should be built of construction elements accessible in Poland. Having obtained the final approval of the project - tandem accelerator with 5 MV pressurized Van de Graaff generator, the construction was started in 1980. The investment period should be finished in 1982 with a single ended 5 MV accelerator. Simultaneously, the calculations and preparation for a tandem mode was begun. The gas handling system has just been made by the home industry and should be mounted and tested in 1981. The reconstruction of the building should be performed in the same time

  10. Status of the SLAC Linear Collider Project

    International Nuclear Information System (INIS)

    Stiening, R.

    1983-01-01

    The SLAC Linear Collider Project has two principal goals. The first is to serve as a prototype for a future very high energy linear electron-positron collider. The second is to quickly, at low cost, achieve sufficient luminosity at 100 GeV center-of-mass energy to explore the physics of the Z 0 . The first goal is important to the future of electron-positron physics because the rapid increase of synchrotron radiation with energy causes the cost of circular storage ring colliders to whereas the cost of linear colliders increases only in proportion to the center-of-mass energy. The second is important because the existance at SLAC of a linear accelerator which can be converted at low cost to collider operation makes possible a unique opportunity to quickly achieve 100 GeV center-of-mass collisions. At the design luminosity of 6.0 x 10 30 many thousands of Z 0 decays should be observed in each day of operation

  11. Status of Kijang Resarch Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jee. Y; Kwon, T. H.; Kim, Jun. Y.; Oh, G. B. [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The High-flux Advanced Neutron Application Reactor (HANARO) is a multi-purpose reactor in Korea Atomic Energy Research Institute (KAERI) and is being utilized for neutron scattering experiments, material and fuel tests for nuclear power plants, radio-isotope (RI) productions, silicon doping, neutron activation analysis, and neutron radiography. In medical applications, the majority of RIs produced using HANARO are I-131 and Ir-192. Other RIs such as Mo-99 are coming from imports. The self-sufficiency of RI demand becomes an important issue for the public health service in Korea. In this regard the Kijang Research Reactor (KJRR) project was officially launched on the first of April 2012 in need to provide the self-sufficiency of RI demand including Mo-99, increase the neutron transportation doping (NTD) capacity and develop technologies related to the research reactor. When CP is granted, the first excavation is planned to start at the end of this year. In next year, pouring the first concrete and energizing 154kV will follow. In 2018, it is planned to complete utility building construction and reactor building construction.

  12. Status of the beryllium replacement project

    Energy Technology Data Exchange (ETDEWEB)

    Dimayuga, I. [Atomic Energy of Canada, Chalk River, Ontario (Canada); Corcoran, E. [Royal Military College of Canada, Kingston, Ontario (Canada); Daniels, T. [Ontario Power Generation, Pickering, Ontario (Canada); Harmsen, J. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada); Lu, E. [Bruce Power, Tiverton, Ontario (Canada); Onderwater, T.; Palleck, S. [General Electric- Hitachi, Wilmington, North Carolina (United States); Pant, A. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada)

    2013-07-01

    mechanical properties of the joint; corrosion resistance tests; and high-temperature exposure tests (to air or steam). At the conclusion of the out-reactor tests, results will be reviewed to determine the top two candidate materials that will advance to the in-reactor, irradiation test. The paper will present the status of out-reactor testing, including results of both the constructability assessment and mechanical property testing.

  13. The status of BNFL's MOX project

    International Nuclear Information System (INIS)

    Edwars, John; Cooch, Julian P.; Slater, Michel W.

    2002-01-01

    Full text: In the late 1980s BNFL decided to enter the MOX fuel fabrication business to support our reprocessing business and return the plutonium product to our customers in the useable form of MOX fuel. The first phase of the strategy was to gain some irradiation experience for MOX produced by our own Short Binderless Route (SBR) process. To achieve this the MOX Demonstration Facility (MDF) was built at Sellafield and 28 MOX fuel assemblies were produced up to 1998 that were loaded into PWRs in Europe. In 1994, BNFL started the construction of their large scale MOX production plant, SMP. The design and construction of the plant and supporting facilities was completed some years ago and the commissioning of the plant with uranium commenced around June 1999. In October 2001, the UK Government provided BNFL with the approval to operate SMP with plutonium. On 20 December 2001, the UK Regulators gave BNFL their approval to start plutonium operations. This paper summarises the approach used to commission SMP and describes some of the lessons learnt during the commissioning phase of the project and the start up of the plant with plutonium. An explanation of our experience obtaining a licence to operate the plant is provided together with a description of the changes we have made to ensure that the quality of the product from SMP can be guaranteed. Finally, the paper summarises the experience BNFL has gained during irradiating MOX fuel produced by the SBR process and explains how the data compares with that available for UO2 and supports the in reactor use of MOX fuel made in SMP. (author)

  14. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1984-12-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project FY 1984 major accomplishments are summarized. Twenty-five percent of the processing site remedial actions at Canonsburg, PA, were completed. Remedial action on 118 vicinity properties at four designated locations were initiated and survey and inclusion activities on a total of 420 vicinity properties were completed. The Environmental Impact Statement (EIS) for Salt Lake City, UT, and the Environmental Assessment (EA) for Shiprock, NM were published, and the preliminary draft EIS for Durango, CO, was prepared. Remedial Action Plans (RAPs) for Salt Lake City, UT, and Shiprock, NM were completed, and draft RAPs for Gunnison, CO, and Riverton, WY were prepared. Cooperative agreements with Oregon, Wyoming, and South Dakota were executed, and the Utah cooperative agreement was modified to assign the construction management responsibility to the state. An Interagency Agreement with TVA for disposal of the Edgemont vicinity property material was executed

  15. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  16. AREVA General Inspectorate Annual Report 2013 - Status of safety in nuclear facilities

    International Nuclear Information System (INIS)

    Oursel, Luc; Riou, Jean

    2014-06-01

    This annual report by AREVA's General Inspectorate deals with the status of nuclear safety and radiation protection in the group's facilities and operations over the course of 2013. Based on the findings made during implementation of the annual inspection program, this annual report also includes the results of the analysis of significant events and the observations and assessments of specialists in the Safety Health Security Sustainable Development Department (SHSSDD), supplemented by regular interaction with the safety regulators, different government agencies, stakeholders and other nuclear operators. Additionally, this report presents the action plans put into motion and the directions taken for continuous improvement in risk prevention for operations conducted in France and internationally. In 2013, the level of safety in the group's nuclear facilities and operations remained satisfactory, although improvements are necessary in some domains. This report is based on established indicators, analyses of reported events, responses to commitments made to the regulators, and the results of different improvement actions reported on in the inspected and supported entities. In 2013, no level 2 event on the International Nuclear and Radiological Event Scale (INES) was reported, the bottom-up reporting of weak signals was confirmed, dose levels were low and there were no radiological impacts on the environment. The General Inspectorate conducted 45 inspections in 30 of the group's entities in 2013. Of these, 10 concerned sites outside France and 7 were conducted following events or particular situations. These inspections gave rise to 176 recommendations, which the inspected entities have translated into action plans. Verification of these different action plans according to planned procedures and announced schedules gave rise to 16 follow-up inspections. The major lessons learned from these inspections relate to project management, facility compliance and operational

  17. Status of safety at Areva group facilities. 2006 annual report

    International Nuclear Information System (INIS)

    2006-01-01

    This report presents a snapshot of nuclear safety and radiation protection conditions in the AREVA group's nuclear installations in France and abroad, as well as of radiation protection aspects in service activities, as identified over the course of the annual inspections and analyses program carried out by the General Inspectorate in 2006. This report is presented to the AREVA Supervisory Board, communicated to the labor representation bodies concerned, and made public. In light of the inspections, appraisals and coordination missions it has performed, the General Inspectorate considers that the nuclear safety level of the AREVA group's nuclear installations is satisfactory. It particularly noted positive changes on numerous sites and efforts in the field of continuous improvement that have helped to strengthen nuclear safety. This has been possible through the full involvement of management teams, an improvement effort initiated by upper management, actions to increase personnel awareness of nuclear safety culture, and supervisors' heightened presence around operators. However, the occurrence of certain events in facilities has led us to question the nuclear safety repercussions that the changes to activities or organization on some sites have had. In these times of change, drifts in nuclear safety culture have been identified. The General Inspectorate considers that a preliminary analysis of the human and organizational factors of these changes, sized to match the impact the change has on nuclear safety, should be made to ensure that a guaranteed level of nuclear safety is maintained (allowance for changes to references, availability of the necessary skills, resources of the operating and support structures, etc.). Preparations should also be made to monitor the changes and spot any telltale signs of drift in the application phase. Managers should be extra vigilant and the occurrence of any drift should be systematically dealt with ahead of implementing

  18. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  19. Status of the National Synchrotron Light Source project

    International Nuclear Information System (INIS)

    Heese, R.N.

    1981-01-01

    The National Synchrotron Light Source is in its final stages of construction, and as the turn-on time for the 700 MeV vuv storage ring draws near, an overview of the project is presented. Emphasis is placed on the linac and booster synchrotron performance and the status of major subsystems

  20. Status of the JET project and its supporting technological programme

    International Nuclear Information System (INIS)

    Bertolini, E.

    1976-01-01

    A brief review of the overall design of the JET facility is given. Particular JET components described include the vacuum system, toroidal field coils, poloidal system, power supplies, control and data acquisition, and status of the project towards the construction phase

  1. Annual Status Report on Nationally Appropriate Mitigation Actions (NAMAs) 2013

    Energy Technology Data Exchange (ETDEWEB)

    Haensel, G.; Roeser, F.; Hoehne, N. [Ecofys, Utrecht (Netherlands); Van Tilburg, X.; Cameron, L. [ECN Policy Studies, Amsterdam (Netherlands)] (eds.)

    2013-11-15

    results of an online survey that collected respondents' considerations taken when designing and implementing NAMAs and elements perceived as key in operationalising a NAMA registry. UNEP Risoe Centre reflects on the linkages between lowcarbon development strategies, nationally appropriate mitigation actions and measuring, reporting and verification processes. The Overseas Environmental Cooperation Center (OECC) reflects on domestic institutional arrangement instead as essential elements in the development, coordination and implementation of NAMAs and their MRV. The contribution of the World Resources Institute (WRI) seeks to unpack MRV needs for estimating the greenhouse gas emissions reductions associated with NAMAs, as well as existing resources available to assist countries. The NAMA Facility presents an overview of its objectives, governance structure and selection and implementation procedures for NAMA support projects.

  2. Annual Status Report (FY2016) Performance Assessment for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Casbon, M. A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2017-03-15

    DOE O 435.1, Radioactive Waste Management, and DOE M 435.1-1, Radioactive Waste Management Manual, require that a determination of continued adequacy of the performance assessment (PA), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and it must consider the results of data collection and analysis from research, field studies, and monitoring. Annual summaries of low-level waste (LLW) disposal operations must be prepared with respect to the conclusions and recommendations of the PA and CA, and a determination of the need to revise the PA or CA must be made. The annual summary requirement provides a structured approach for demonstrating the continued adequacy of the PA and CA in demonstrating a reasonable expectation that the performance objectives will be met. This annual summary addresses only the status of the Environmental Restoration Disposal Facility (ERDF) PA (CP-60089, Performance Assessment for the Environmental Restoration Disposal Facility, Hanford Site, Washington, formerly WCH-520 Rev. 1)1. The CA for ERDF is supported by DOE/RL-2016-62, Annual Status Report (FY 2016): Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site. The ERDF PA portion of the CA document is found in Section 3.1.4, and the ERDF operations portion is found in Section 3.3.3.2 of that document.

  3. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  4. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

  5. Croatian repository construction project - present status and main obstacles

    International Nuclear Information System (INIS)

    Kucar Dragicevic, S.; Subasic, D.; Schaller, A.; Lokner, V.; Cerskov Klika, M.

    1999-01-01

    Croatia has been preparing backgrounds for the construction of the repository for low and intermediate radioactive waste on its territory, almost for a decade, now. In the name of Hrvtaska elektroprivreda, the co-owner of the NE Krsko, APO has been co-ordinating and organising numerous activities and projects during that time period. Siting process, safety assessment, disposal technology and repository design and public acceptance issues are the main fields of activities. The overall status of the project at the moment, including the overview of the present status of the main four aspects of activities, will be presented. Relatively, big and important progress made on the project work out during the last two years, as well as the main obstacles we were faced with during that time period, will be discussed.(author)

  6. 1. annual workshop proceedings of integrated project fundamental processes of radionuclide migration IP Funmig

    International Nuclear Information System (INIS)

    Reiller, P.; Buckau, G.; Kienzler, B.; Duro, L.; Martell, M.

    2006-01-01

    These are the proceedings of the 1. Annual Workshop Proceedings of the Integrated Project FUNMIG (fundamental processes of radionuclide migration). The Annual Workshop was hosted by CEA and held in Saclay, 28 November - 1 December 2005. The project started January 2005 and has a duration of four years. The project makes use of annual workshops bringing the project partners together and inviting external groups to participate and contribute. Consequently, the present proceedings will be followed by another three proceedings from the forthcoming annual workshops to be held the end of 2006, 2007 and 2008. The 2. Annual Workshop will be hosted by SKB and be held in Stockholm, 21-23 November 2006. The proceedings serve several purposes. The key purpose is to document and make available to a broad scientific community the outcome of this project. A considerable part of the project activity reporting is also done through the proceedings. For this reason the first parts of the proceedings are structured around the workshop and the project. A large part of the proceedings, however, also contain individual scientific contributions by the project partners as well as external contributors. Information about the project can be found under www.funmig.com. (authors)

  7. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  8. Annual Status Report (FY2014) 200 West and 200 East Performance Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States); Khaleel, R. [INTERA, Inc., Austin, TX (United States); Mehta, S. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2015-03-24

    This annual review provides the projected dose estimates of radionuclide inventories disposed in the active Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original does methodology developed in the performance assessment analyses.

  9. The status of the LANSCE refurbishment project (LANSCE-R)

    International Nuclear Information System (INIS)

    Erickson, John Leonard; Jones, Kevin; Streve, Michael

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  10. The technical status of the supersara project at its termination

    International Nuclear Information System (INIS)

    Markovina, A.; Randles, J.

    1987-01-01

    On March 10th 1983 the Council of Ministers of the European Community adopted the decision to abandon the SuperSARA project. In the frame of this decision, the Management of the SuperSARA project formulated the guidelines to close the project, which included the preparation of the present final report. This report presents the final status of the project, which means that it reflects the situation in March 1983, with a few updates introduced shortly afterwards in conformity with the safety requirements which were being revised at that time. The aim of this report is to give a general description of activities which were carried on to implement the experimental programme and to illustrate some important achievements reached in specific areas. In addition, it is also intended to provide the access key to the documentation which was produced in the past years, so as to make the most significant technical material easily available for any possible future use

  11. Marine radioecology. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-06-01

    The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs

  12. Kalispel Resident Fish Project, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Olson, Jason; Andersen, Todd (Kalispel Natural Resource Department, Usk, WA)

    2006-07-01

    In 2005 the Kalispel Natural Resource Department (KNRD) monitored its current enhancement projects for bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi). Largemouth Bass (Micropterus salmoides) enhancement projects were also monitored. Additional baseline fish population and habitat assessments were conducted, in East River and several of its tributaries.

  13. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  14. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  15. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  16. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  17. Annual report of the nuclear safeguards project 1978

    International Nuclear Information System (INIS)

    Mache, H.R.

    1980-05-01

    The present report describes the major activities carried out in 1978 in the framework of the Nuclear Safeguards Project by the institutes of the Kernforschungszentrum Karlsruhe, Kernforschungsanlage Juelich, the European Institute of Transuranium Elements and some industrial firms. (orig.) [de

  18. Annual report of the Nuclear Safeguards Project 1980

    International Nuclear Information System (INIS)

    Mache, H.R.

    1981-10-01

    The present report describes the major activities carried out in 1980 in the framework of the Nuclear Safeguards Project by the Institutes of the Kernforschungszentrum Karlsruhe and the European Institute of Transuranium Elements. (orig.) [de

  19. Annual report of the Nuclear Safeguards Project l976

    International Nuclear Information System (INIS)

    1977-07-01

    The present report describes the major activities carried out in 1976 in the framework of the Nuclear Safeguards Project by the institutes of the Gesellschaft fuer Kernforschung Karlsruhe, the European Institute of Transuranium Elements and some industrial firms. (orig.) [de

  20. NREL Energy Storage Projects: FY2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

    2014-07-01

    In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

  1. 75 FR 8245 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2010-02-24

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 18, 2010. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: This final..., Natural gas, Reporting and recordkeeping requirements. Jeff C. Wright, Director, Office of Energy Projects...

  2. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  3. European DataGrid project: status and plans

    International Nuclear Information System (INIS)

    Kunszt, P.

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets--from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been continuously refined according to the requirements of our user communities and our experience

  4. European DataGrid project Status and plans

    CERN Document Server

    Kunszt, Peter Z

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets - from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been conti...

  5. Malheur River Wildlife Mitigation Project : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kesling, Jason; Abel, Chad; Schwabe, Laurence

    2009-01-01

    In 1998, the Burns Paiute Tribe (BPT) submitted a proposal to Bonneville Power Administration (BPA) for the acquisition of the Malheur River Wildlife Mitigation Project (Project). The proposed mitigation site was for the Denny Jones Ranch and included Bureau of Land Management (BLM) and Oregon Division of State Lands (DSL) leases and grazing allotments. The Project approval process and acquisition negotiations continued for several years until the BPT and BPA entered into a Memorandum of Agreement, which allowed for purchase of the Project in November 2000. The 31,781 acre Project is located seven miles east of Juntura, Oregon and is adjacent to the Malheur River (Figure 1). Six thousand three hundred eighty-five acres are deeded to BPT, 4,154 acres are leased from DSL, and 21,242 acres are leased from BLM (Figure 2). In total 11 grazing allotments are leased between the two agencies. Deeded land stretches for seven miles along the Malheur River. It is the largest private landholding on the river between Riverside and Harper, Oregon. Approximately 938 acres of senior water rights are included with the Ranch. The Project is comprised of meadow, wetland, riparian and shrub-steppe habitats. The BLM grazing allotment, located south of the ranch, is largely shrub-steppe habitat punctuated by springs and seeps. Hunter Creek, a perennial stream, flows through both private and BLM lands. Similarly, the DSL grazing allotment, which lies north of the Ranch, is predominantly shrub/juniper steppe habitat with springs and seeps dispersed throughout the upper end of draws (Figure 2).

  6. Biomarkers: project update from the GRAPPA 2012 annual meeting.

    Science.gov (United States)

    FitzGerald, Oliver; Mease, Philip J

    2013-08-01

    For members of the Group for Research and Assessment of Psoriasis and Psoriatic Arthritis (GRAPPA), an important goal has been the identification of soluble biomarkers in psoriatic arthritis that might predict the development of radiographic progression. Work over the past year has resulted in approval of a draft protocol, and an announcement is forthcoming of the outcome of an assessment process for centers that applied to manage the project. GRAPPA is now ready to commence formal negotiations with potential funding partners and intends to initiate this project in the near future.

  7. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Powell, Russ M.; Stennfeld, Scott P.

    2001-04-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old

  8. Photovoltaic Programme Edition 2007. Summary Report, Project List, Annual Project Reports 2006 (Abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This 2007 edition summary report for the Swiss Federal Office of Energy (SFOE), reports on the work done within the framework of the Swiss Photovoltaics Program in 2006. The document contains 46 abstracts on work done in the photovoltaics area. The subjects reported on in the thin-film photovoltaics sector include advanced processing and characterisation of thin film silicon solar cells, high-rate deposition of micro-crystalline silicon, a new large-area VHF reactor for high-rate deposition of micro-crystalline silicon, the stability of zinc oxide in encapsulated thin film silicon solar cells, spectral photocurrent measurement, roll-to-roll technology for the production of thin film silicon modules, advanced thin film technologies, ultra thin silicon wafer cutting, bifacial thin industrial multi-crystalline silicon solar cells, flexible CIGS solar cells and mini-modules, large-area CIS-based thin-film solar modules and advanced thin-film technologies. In the area of dye-sensitised modules, the following projects are reported on: Dye-sensitised nano-crystalline solar cells, voltage enhancement of dye solar cells and molecular orientation as well as low band-gap and new hybrid device concepts for the improvement of flexible organic solar cells. Other projects reported on include a new PV wave making more efficient use of the solar spectrum, photovoltaic textiles, organic photovoltaic devices, photo-electrochemical and photovoltaic conversion and storage of solar energy, PV modules with antireflex glass, improved integration of PV into existing buildings, the seventh program at the LEEE-TISO, the 'PV enlargement' and 'Performance' programs, efficiency and annual electricity production of PV modules, photovoltaics system technology 2005-2006, an update on photovoltaics in view of the 'ecoinvent' v.2.0 tool and environmental information services for solar energy industries. The contributions to four Swiss IEA PVPS tasks and the Swiss interdepartmental platform for

  9. Pacific Lamprey Research and Restoration Project : Annual Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    This report summarizes results of research activities conducted in 1999-2000. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin.

  10. Hearth monitoring project annual report for FY-1981

    International Nuclear Information System (INIS)

    Nieschmidt, E.B.; Lawrence, R.S.

    1981-08-01

    Progress during FY 1981 in the Hearth Monitoring project for the Idaho National Engineering Laboratory Transuranic Waste Treatment Facility is reported. Results of calculational, experimental and instrumental phases of the program are presented. Recommendations and plans for continuation of the program are displayed. Schedules for future efforts are included

  11. Grande Ronde Basin Fish Habitat Enhancement Project : 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Powell, Russ M.

    1999-05-01

    The primary goal of ''The Grande Ronde Basin Fish Habitat Improvement Project'' is to access, create, improve, protect, and restore reparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin.

  12. Nuclear fusion project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-05-01

    This semi-annual report gives 36 short descriptions of the work done in the framework of the Nuclear Fusion Project and outlines studies for NET/INTOR and for ECRH power sources at 150 GHz. Tables of fusion technology contracts, of NET contracts, of KfK departments contributing to the Fusion Project, and of the Fusion Project management staff complete this report. (GG)

  13. 2001 annual report for the Pend Oreille wetlands wildlife mitigation projects; ANNUAL

    International Nuclear Information System (INIS)

    Entz, Ray D.

    2001-01-01

    The Pend Oreille Wetlands project consists of two adjacent parcels totaling about 600 acres. The parcels make up the northern boundary of the Kalispel Indian Reservation, and is also adjacent to the Pend Oreille River about 25 miles north of Newport and Albeni Falls Dam (Figure 1). Located in the Selkirk Mountains in Pend Oreille County Washington, the project is situated on an active floodplain, increasing its effectiveness as mitigation for Albeni Falls Dam. The combination of the River, wetlands and the north-south alignment of the valley have resulted in an important migratory waterfowl flyway. Washington Department of Fish and Wildlife and Kalispel Natural Resource Department have designated both project sites as priority habitats. Seven habitat types exist on the project properties and include four wetland habitats (open water, emergent, and scrub-shrub and forested), riparian deciduous forest, upland mixed coniferous forest and floodplain meadow. Importance of the project to wildlife is further documented by the occurrence of an active Bald Eagle nest aerie

  14. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and

  15. Status of the KM3NeT project

    International Nuclear Information System (INIS)

    Katz, U.F.

    2009-01-01

    KM3NeT is a future research infrastructure in the Mediterranean Sea, hosting a cubic-kilometre scale neutrino telescope and nodes for associated sciences such as marine biology, oceanology and geophysics. The status of the KM3NeT project and the progress made in the EU-funded Design Study is reviewed. Some physics studies indicating the sensitivity of the KM3NeT neutrino telescope are highlighted and selected major technical design options to be further pursued are described. Finally, the remaining steps towards construction of KM3NeT will be discussed. This document reflects the status of the KM3NeT Conceptual Design Report (CDR), which has been presented to the public for the first time at the VLVnT08 Workshop.

  16. The CAREM project: Present status and development activities

    International Nuclear Information System (INIS)

    Boado Magan, H.J.; Ordonez, J.P.; Hey, A.

    1997-01-01

    The CAREM Project is a low power NPP of 25 Mwe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type and several passive safety systems are included. The owner of the Project is Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, is the main contractor. The present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. A short description of the Experimental Facilities, listed below, already in operation and under construction are also included: CAPCN High Pressure Loop. Natural convection loop to verify dynamic response and critical heat flux; RA-8. Critical Facility, designed and constructed for the CAREM Project (that may be used as a general uses facility); RPV lnternals. The whole assembly of absorbent rods, connecting rods and the rode guides are being constructed in a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameters definitions. Control Drive Mechanisms. A series of verification and tests are being carried out on these within RPV Hydraulically driven mechanisms. Other development activities are mentioned in relation with the thermalhydraulics, Steam Generators and Control. (author)

  17. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  18. West Valley Demonstration Project annual report to Congress

    International Nuclear Information System (INIS)

    1990-01-01

    By the end of the fiscal year, the West Valley Demonstration Project had processed 757,000 litres of liquid high-level waste, removing most of the radioactive constituents by ion exchange. The radioactive ion exchange material is being stored in an underground tank pending its incorporation, along with sludge still in the tank, into borosilicate glass. The decontaminated salt solution was solidified into a cement low-level waste form which has been reviewed and endorsed by the Nuclear Regulatory Commission. Five tests of the waste glass melter system were completed. A Notice of Intent was published to prepare a joint federal/state Environmental Impact Statement. Design of the Vitrification Facility, a major milestone, was completed and construction of the facility enclosure has begun. A Department of Energy Tiger Team and Technical Safety Appraisal of the Project found no undue risks to worker or public health and safety or the environment

  19. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  20. Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wingert, Michele; Andersen, Todd [Kalispel Natural Resource Department

    2008-11-18

    Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public

  1. Power Generation and Transportation Systems Research Department: 1992 annual status report (Gas Research Institute)

    International Nuclear Information System (INIS)

    Benedict, A.

    1992-09-01

    Activities of Gas Research Institute's Power Generation and Transportation Systems subprogram for the period between October 1, 1991 and September 30, 1992 are summarized. The particular project areas covered in the report are Cogeneration and Power Systems, Engine Technology and Component Development, Natural Gas Vehicles Research, and Electric Power Generation. For each project area a separate chapter is provided. Each chapter includes a rationale for funding the research effort, the goals and objectives to be achieved, a general statement on research accomplishments, and the strategy employed in the project area. Each chapter also contains a series of summary reports on the status of each contract

  2. Status of SPIRAL. The radioactive beam project at GANIL

    International Nuclear Information System (INIS)

    Lieuvin, M.

    1995-01-01

    SPIRAL, a radioactive ion beam facility (RIB) is under construction at GANIL (Caen, France). The heavy ion beams of GANIL will be used to produce radioactive atoms by the ISOL method. After ionisation by an ECR ion source (ECRIS), the low energy radioactive beam is axially injected on the first orbit of a k=265 compact cyclotron. The final energy will range between 1.7 and 25 MeV/u (harmonics 5 to 2) and the accelerated ions will be sent to the existing GANIL experimental areas. The present status of the project is described. (author)

  3. Short status report on EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.

    1991-10-01

    A short status report is given on the European Fusion File (EFF) and European Activation File (EAF) projects. The EFF-2 data file is nearly finished and processing and benchmarking is underway. There is also a second version (EAF-2) of the activation file which is a very extensive and complete data base. Recently follow-up programmes have been defined for the introduction of EFF-2 to the user community after benchmarking and for further improvement of the quality of the two data files. There is extensive international cooperation, which is becoming increasingly important to solve remaining difficult problems. (author). 17 refs

  4. KWIKPLAN: a computer program for projecting the annual requirements of nuclear fuel cycle operations

    International Nuclear Information System (INIS)

    Salmon, R.; Kee, C.W.

    1977-06-01

    The computer code KWIKPLAN was written to facilitate the calculation of projected nuclear fuel cycle activities. Using given projections of power generation, the code calculates annual requirements for fuel fabrication, fuel reprocessing, uranium mining, and plutonium use and production. The code uses installed capacity projections and mass flow data for six types of reactors to calculate projected fuel cycle activities and inventories. It calculates fissile uranium and plutonium flows and inventories after allowing for an economy with limited reprocessing capacity and a backlog of unreprocessed fuel. All calculations are made on a quarterly basis; printed and punched output of the projected fuel cycle activities are made on an annual basis. Since the punched information is used in another code to determine waste inventories, the code punches a table from which the effective average burnup can be calculated for the fuel being reprocessed

  5. Mississippi graduate DOE EPSCor trainee project. First annual summary report

    Energy Technology Data Exchange (ETDEWEB)

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  6. Mississippi graduate DOE EPSCor trainee project. [First Annual Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  7. Subseabed disposal program annual report, January-December 1979. Volume I. Summary and status

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-08-01

    This is the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program, which was begun in June 1973. The program was initiated by Sandia National Laboratories to explore the utility of stable, uniform, and relatively unproductive areas of the world's oceans as possible repositories for high-level nuclear wastes. The program, now international in scope, is currently focused on the stable submarine geologic formations under the deep oceans. Summaries are presented in the following areas: systems analysis; barrier system characterization and assessment; environmental studies; emplacement; sampling and instrumentation development; and transportation studies

  8. Elsam. Offshore Wind Farm. Horns Rev. Annual status report for the environmental monitoring programme 1. January 2001 - 31. December 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-10-15

    As a result of the Danish Government's Energy Plan 21 a target of 5,500 MW wind power is to be erected in Denmark by 2030. 4,000 MW of these are to be placed offshore in special pointed areas with minimal impacts on the environment. In 1998 the Danish Ministry of Environment and Energy ordered two power companies, Elsam and Energi E2, to establish each a demonstration wind farm at one of the five pointed areas. The intention was to follow the environmental impacts from the wind farm and to evaluate the possibility of setting up about 1,500 MW in each area with as little impact on the environment as possible. In 1999 the two power companies were given approval to begin pre-studies of each of the two wind farms and the work on the site construction as well as the environmental impact assessment related hereto was initiated. The authorities made a number of requirements for the EIA surveys according to the EU-directive for preparation of EIA reports. In the summer of 2000 the EIA report with project description was submitted to the authorities and the project was approved in the spring of 2001. During the summer and autumn of 2001 orders were placed for the components for the wind farm, i.e. foundations, towers, wind turbines, cables etc. After having finalised the EIA, monitoring programmes of the wind farms were initiated on basis of the results of the surveys carried out during the EIA. This means that continuous surveys have been implemented for most of the environmental parameters from 1999 and till today. This annual status report for 2001 is to present the results from the annual environmental monitoring programme (the baseline studies) at Horns Rev, which form part of the monitoring programme set up for the Horns Rev project. To get a complete picture of the Danish monitoring programme for the national demonstration wind farm project it is necessary to see the report for Horns Rev and for Roedsand as a whole. The report comprises a description of the wind

  9. Elsam. Offshore Wind Farm. Horns Rev. Annual status report for the environmental monitoring programme 1. January 2001 - 31. December 2001

    International Nuclear Information System (INIS)

    2002-10-01

    As a result of the Danish Government's Energy Plan 21 a target of 5,500 MW wind power is to be erected in Denmark by 2030. 4,000 MW of these are to be placed offshore in special pointed areas with minimal impacts on the environment. In 1998 the Danish Ministry of Environment and Energy ordered two power companies, Elsam and Energi E2, to establish each a demonstration wind farm at one of the five pointed areas. The intention was to follow the environmental impacts from the wind farm and to evaluate the possibility of setting up about 1,500 MW in each area with as little impact on the environment as possible. In 1999 the two power companies were given approval to begin pre-studies of each of the two wind farms and the work on the site construction as well as the environmental impact assessment related hereto was initiated. The authorities made a number of requirements for the EIA surveys according to the EU-directive for preparation of EIA reports. In the summer of 2000 the EIA report with project description was submitted to the authorities and the project was approved in the spring of 2001. During the summer and autumn of 2001 orders were placed for the components for the wind farm, i.e. foundations, towers, wind turbines, cables etc. After having finalised the EIA, monitoring programmes of the wind farms were initiated on basis of the results of the surveys carried out during the EIA. This means that continuous surveys have been implemented for most of the environmental parameters from 1999 and till today. This annual status report for 2001 is to present the results from the annual environmental monitoring programme (the baseline studies) at Horns Rev, which form part of the monitoring programme set up for the Horns Rev project. To get a complete picture of the Danish monitoring programme for the national demonstration wind farm project it is necessary to see the report for Horns Rev and for Roedsand as a whole. The report comprises a description of the wind farm

  10. West Valley Demonstration Project, West Valley, New York: Annual report

    International Nuclear Information System (INIS)

    1989-01-01

    Under the West Valley Demonstration Project Act, Public Law 96-368, liquid high-level radioactive waste stored at the Western New York Nuclear Services Center, West Valley, New York, that resulted from spent nuclear fuel reprocessing operations conducted between 1966 and 1972, is to be solidified in borosilicate glass and transported to a federal repository for geologic disposal. A major milestone was reached in May 1988 when the Project began reducing the volume of the liquid high-level waste. By the end of 1988, approximately 15 percent of the initial inventory had been processed into two waste streams. The decontaminated low-level liquid waste is being solidified in cement. The high-level waste stream is being stored in an underground tank pending its incorporation into borosilicate glass. Four tests of the waste glass melter system were completed. These tests confirmed equipment operability, control system reliability, and provided samples of waste glass for durability testing. In mid-1988, the Department validated an integrated cost and schedule plan for activities required to complete the production of the waste borosilicate glass. Design of the radioactive Vitrification Facility continued

  11. NREL Energy Storage Projects. FY2014 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, Ahmad [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ban, Chunmei [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Burton, Evan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gonder, Jeff [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Grad, Peter [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jun, Myungsoo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Keyser, Matt [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kim, Gi-Heon [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Neubauer, Jeremy [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Santhanagopalan, Shriram [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Saxon, Aron [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Shi, Ying [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Smith, Kandler [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Sprague, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tenent, Robert [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wood, Eric [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Yang, Chuanbo [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Chao [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Han, Taeyoung [General Motors, Detroit, MI (United States); Hartridge, Steve [CD-adapco, Detroit, MI (United States); Shaffer, Christian E. [EC Power, Aurora, CO (United States)

    2015-03-01

    The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Battery Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.

  12. FY2011 Annual Report for NREL Energy Storage Projects

    Energy Technology Data Exchange (ETDEWEB)

    Pesaran, A.; Ban, C.; Dillon, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Lee, K. J.; Long, D.; Neubauer, J.; Santhangopalan, S.; Smith, K.

    2012-04-01

    This report describes the work of NREL's Energy Storage group for FY2011. The National Renewable Energy Laboratory (NREL) supports energy storage R&D under the Vehicle Technologies Program at the U.S. Department of Energy (DOE). The DOE Energy Storage program's charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation's goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are: (1) Advanced Battery Development [through the United States Advanced Battery Consortium (USABC)]; (2) Testing, Design and Analysis (TDA); (3) Applied Battery Research (ABR); and (4) Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT). In FY11, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL's R&D projects in FY11 in support of the USABC, TDA, ABR, and BATT program elements. In addition, we continued the enhancement of NREL's battery testing facilities funded through the American Reinvestment and Recovery Act (ARRA) of 2009. The FY11 projects under NREL's Energy Storage R&D program are briefly described below. Each of these is discussed in depth in the main sections of this report.

  13. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Soults, Scott [Kootenai Tribe of Idaho

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  14. Status of the McClean project, Saskatchewan, Canada

    International Nuclear Information System (INIS)

    Giroux, M.

    1997-01-01

    The paper describes the status of development of the McClean Lake uranium production project. The project includes development of a new mine/mill complex located 10 kilometres west of the Rabbit Lake mine site, in the Athabaska region of northern Saskatchewan, Canada. This first Canadian uranium project since Key Lake was developed in the late 1970s, is planned to help provide the increasing need for uranium production during the rest of the 1990s and beyond. The report describes the geological model for the 6 unconformity-type uranium orebodies named: JEB; Sue A, B and C; and McClean Lake A and B. These deposits will be extracted using both open pit and underground mines. The report describes the history of exploration and development, as well as the progression of the environmental clearance process under the joint review panel of the Canadian and Saskatchewan governments. The Canadian $250 million project, operated by Cogema Resources, is jointly owned by Denison Mines Limited, Minatco Limited and OURD (Canada) Company Limited. It is scheduled to start producing uranium concentrate in 1997. (author). 1 ref., 10 figs

  15. FY2011 Annual Report for the Actinide Isomer Detection Project

    International Nuclear Information System (INIS)

    Warren, Glen A.; Francy, Christopher J.; Ressler, Jennifer J.; Erikson, Luke E.; Tatishvili, Gocha; Hatarik, R.

    2011-01-01

    This project seeks to identify a new signature for actinide element detection in active interrogation. This technique works by exciting and identifying long-lived nuclear excited states (isomers) in the actinide isotopes and/or primary fission products. Observation of isomers in the fission products will provide a signature for fissile material. For the actinide isomers, the decay time and energy of the isomeric state is unique to a particular isotope, providing an unambiguous signature for SNM. This project entails isomer identification and characterization and neutron population studies. This document summarizes activities from its third year - completion of the isomer identification characterization experiments and initialization of the neutron population experiments. The population and decay of the isomeric state in 235U remain elusive, although a number of candidate gamma rays have been identified. In the course of the experiments, a number of fission fragment isomers were populated and measured (Ressler 2010). The decays from these isomers may also provide a suitable signature for the presence of fissile material. Several measurements were conducted throughout this project. This report focuses on the results of an experiment conducted collaboratively by PNNL, LLNL and LBNL in December 2010 at LBNL. The measurement involved measuring the gamma-rays emitted from an HEU target when bombarded with 11 MeV neutrons. This report discussed the analysis and resulting conclusions from those measurements. There was one strong candidate, at 1204 keV, of an isomeric signature of 235U. The half-life of the state is estimated to be 9.3 μs. The measured time dependence fits the decay time structure very well. Other possible explanations for the 1204-keV state were investigated, but they could not explain the gamma ray. Unfortunately, the relatively limited statistics of the measurement limit, and the lack of understanding of some of the systematic of the experiment, limit

  16. Human activity and climate variability project - annual report 2002

    International Nuclear Information System (INIS)

    Chambers, S.; Harle, K.J.; Sharmeen, S.; Zahorowski, W.; Cohen, D.; Heijnis, H.; Henderson-Sellers, A

    2002-01-01

    Work is well underway on identifying the spatial and temporal extent, direction and range of trace element transport across Tasmania through analysis of lake sediments; A follow up investigation of sedimentation and pollution in the Nattai River catchment following the devastating 2001 bushfires in the region has been completed; The project has been extended to include investigations of evidence of human impacts in the highly sensitive and ecologically important Great Lakes of coastal NSW. This has involved the expansion of our collaboration to include Geoscience Australia; Contributions have been made to the IGBP HITE project. Further contributions will be made as the evidence gathered is drawn together and interpreted; Over the coming year, focus will be placed on completion of the investigation of the extent of aerial transport of trace elements across Tasmania over the last 200 years as well as evidence for human activity and impacts on the Great Lakes region of NSW. Further investigation of potential climate signals from sites in northern Australia will also be made. The first 12 months of data for all ACE-Asia radon and fine particle sites is now available with preliminary analyses performed; The seasonal variability of background radon concentration at each of the radon monitoring sites has been characterised for the available data; Major components related to industrial pollution and soil sources in China have been identified and quantified; Regional and seasonal variations and trends in aerosol constituents have been measured and compared across more than 2.8Mk 2 of sampling area; The Hok Tsui and Kosan detectors were visited for general maintenance and recalibration; A grant application to the APN has been submitted in support of regional inventory analyses based on radon time series; Progress on the processing and interpretation of radon data was presented at the Cape Grim Science Meeting (6-7 February 2002) and the 7th Biennial SPERA Conference on

  17. Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, Scott

    2009-04-10

    Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass

  18. Human activity and climate variability project - annual report 2002

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, S; Harle, K J; Sharmeen, S; Zahorowski, W; Cohen, D; Heijnis, H; Henderson-Sellers, A [Australian Nuclear Science and Technology Organisation, Menai, NSW (Australia)

    2002-07-01

    Work is well underway on identifying the spatial and temporal extent, direction and range of trace element transport across Tasmania through analysis of lake sediments; A follow up investigation of sedimentation and pollution in the Nattai River catchment following the devastating 2001 bushfires in the region has been completed; The project has been extended to include investigations of evidence of human impacts in the highly sensitive and ecologically important Great Lakes of coastal NSW. This has involved the expansion of our collaboration to include Geoscience Australia; Contributions have been made to the IGBP HITE project. Further contributions will be made as the evidence gathered is drawn together and interpreted; Over the coming year, focus will be placed on completion of the investigation of the extent of aerial transport of trace elements across Tasmania over the last 200 years as well as evidence for human activity and impacts on the Great Lakes region of NSW. Further investigation of potential climate signals from sites in northern Australia will also be made. The first 12 months of data for all ACE-Asia radon and fine particle sites is now available with preliminary analyses performed; The seasonal variability of background radon concentration at each of the radon monitoring sites has been characterised for the available data; Major components related to industrial pollution and soil sources in China have been identified and quantified; Regional and seasonal variations and trends in aerosol constituents have been measured and compared across more than 2.8Mk{sup 2} of sampling area; The Hok Tsui and Kosan detectors were visited for general maintenance and recalibration; A grant application to the APN has been submitted in support of regional inventory analyses based on radon time series; Progress on the processing and interpretation of radon data was presented at the Cape Grim Science Meeting (6-7 February 2002) and the 7th Biennial SPERA Conference on

  19. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  20. Status of national programmes on fast breeder reactors. Eighteenth annual meeting, Vienna, Austria, 16-19 April 1985

    International Nuclear Information System (INIS)

    1986-02-01

    The Eighteenth Annual Meeting on the Status of National Programmes in Member States of the IAEA on Fast Breeder Reactors had been held in April 1985. The representatives of the Member States and international organizations reported status and activities in the field of fast breeder reactors development and operation. A separate abstract was prepared for each of the 12 presentations of the meeting

  1. Albeni Falls wildlife mitigation project: annual report of mitigation activities

    International Nuclear Information System (INIS)

    Terra-Burns, Mary

    2002-01-01

    The Albeni Falls Interagency Work Group was actively engaged in implementing wildlife mitigation activities in 2001. The Work Group met quarterly to discuss management and budget issues affecting the Albeni Falls Wildlife Mitigation Program. Work Group members protected 851 acres of wetland habitat in 2001. Wildlife habitat protected to date for the Albeni Falls project is approximately 5,248.31 acres (∼4,037.48 Habitat Units). Approximately 14% of the total wildlife habitat lost has been mitigated. Administrative activities increased as funding was more evenly distributed among Work Group members and protection opportunities became more time consuming. In 2001, Work Group members focused on development and implementation of the monitoring and evaluation program as well as completion of site-specific management plans. With the implementation of the monitoring and evaluation program, and as management plans are reviewed and executed, on the ground management activities are expected to increase in 2002

  2. Hydrogen engine performance analysis project. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

    1980-01-01

    Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

  3. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  4. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  5. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  6. Photovoltaic Programme Edition 2007. Summary Report, Project List, Annual Project Reports 2006 (Abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This 2007 edition summary report for the Swiss Federal Office of Energy (SFOE), reports on the work done within the framework of the Swiss Photovoltaics Program in 2006. The document contains 46 abstracts on work done in the photovoltaics area. The subjects reported on in the thin-film photovoltaics sector include advanced processing and characterisation of thin film silicon solar cells, high-rate deposition of micro-crystalline silicon, a new large-area VHF reactor for high-rate deposition of micro-crystalline silicon, the stability of zinc oxide in encapsulated thin film silicon solar cells, spectral photocurrent measurement, roll-to-roll technology for the production of thin film silicon modules, advanced thin film technologies, ultra thin silicon wafer cutting, bifacial thin industrial multi-crystalline silicon solar cells, flexible CIGS solar cells and mini-modules, large-area CIS-based thin-film solar modules and advanced thin-film technologies. In the area of dye-sensitised modules, the following projects are reported on: Dye-sensitised nano-crystalline solar cells, voltage enhancement of dye solar cells and molecular orientation as well as low band-gap and new hybrid device concepts for the improvement of flexible organic solar cells. Other projects reported on include a new PV wave making more efficient use of the solar spectrum, photovoltaic textiles, organic photovoltaic devices, photo-electrochemical and photovoltaic conversion and storage of solar energy, PV modules with antireflex glass, improved integration of PV into existing buildings, the seventh program at the LEEE-TISO, the 'PV enlargement' and 'Performance' programs, efficiency and annual electricity production of PV modules, photovoltaics system technology 2005-2006, an update on photovoltaics in view of the 'ecoinvent' v.2.0 tool and environmental information services for solar energy industries. The contributions to four Swiss IEA PVPS tasks and the Swiss

  7. Human activity and climate variability project: annual report 2001

    International Nuclear Information System (INIS)

    Harle, K.J.; Heijnis, H.; Henderson-Sellers, A.; Sharmeen, S.; Zahorowski, W.

    2002-01-01

    Knowledge of the state of the Australian environment, including natural climate variability, prior to colonial settlement is vital if we are to define and understand the impact of over two hundred years of post-industrial human activity on our landscape. ANSTO, in conjunction with university partners, is leading a major research effort to provide natural archives of human activity and climate variability over the last 500 years in Australia, utilising a variety of techniques, including lead-210 and radiocarbon dating and analyses of proxy indicators (such as microfossils) as well as direct evidence (such as trace elements) of human activity and climate variability. The other major project objectives were to contribute to the understanding of the impact of human induced and natural aerosols in the East Asian region on climate through analysis and sourcing of fine particles and characterisation of air samples using radon concentrations and to contribute to the improvement of land surface parameterisation schemes and investigate the potential to use stable isotopes to improve global climate models and thus improve our understanding of future climate

  8. Advanced Turbine Technology Applications Project (ATTAP) 1993 annual report

    Science.gov (United States)

    1994-01-01

    This report summarizes work performed by AlliedSignal Engines, a unit of AlliedSignal Aerospace Company, during calendar year 1993, toward development and demonstration of structural ceramic technology for automotive gas turbine engines. This work was performed for the U.S. Department of Energy (DOE) under National Aeronautics and Space Administration (NASA) Contract DEN3-335, Advanced Turbine Technology Applications Project (ATFAP). During 1993, the test bed used to demonstrate ceramic technology was changed from the AlliedSignal Engines/Garrett Model AGT101 regenerated gas turbine engine to the Model 331-200(CT) engine. The 331-200(CT) ceramic demonstrator is a fully-developed test platform based on the existing production AlliedSignal 331-200(ER) gas turbine auxiliary power unit (APU), and is well suited to evaluating ceramic turbine blades and nozzles. In addition, commonality of the 331-200(CT) engine with existing gas turbine APU's in commercial service provides the potential for field testing of ceramic components. The 1993 ATTAP activities emphasized design modifications of the 331-200 engine test bed to accommodate ceramic first-stage turbine nozzles and blades, fabrication of the ceramic components, ceramic component proof and rig tests, operational tests of the test bed equipped with the ceramic components, and refinement of critical ceramic design technologies.

  9. Annual Energy Outlook 1992 with projections to 2010

    International Nuclear Information System (INIS)

    1992-01-01

    Dramatic events over the past year show how international developments can affect domestic energy markets. Market reactions to events in the Persian Gulf and in what used to be called the Soviet Union reinforced the perception of global interdependence in regard to both energy supply and energy demand. The interdependence was reflected most visibly and promptly in world oil prices. With US reliance on foreign oil expected to continue trending upward, any price changes tend to ''feed back'' throughout this Nation's economy. Despite short-term fluctuations, the longer-range US energy outlook has remained relatively constant since last year. Assuming that current laws and policies remain in force, this document addresses uncertainties by discussing four alternative scenarios in addition to a ''reference'' case. Two cases vary the assumption about the rate at which the US national economy will grow, while the other two estimate effects if world oil prices should go lower or higher. This report gives projections to 2010 for energy end uses, oil, gas, electricity, coal, and comparative analyses

  10. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  11. Soil water status under perennial and annual pastures on an acid duplex soil

    International Nuclear Information System (INIS)

    Heng, L.K.; White, R.E.; Chen, D.

    2000-01-01

    A comprehensive field study of soil water balance, nitrogen (N) cycling, pasture management and animal production was carried out on an acid duplex soil at Book Book near Wagga Wagga in southern New South Wales. The experiment, carried out over a 3-year period, tested the hypothesis that sown perennial grass pastures improve the sustainability of a grazing system through better use of water and N. The treatments were: annual pastures without lime (AP-), annual pastures with lime (AP+), perennial pastures without lime (PP-) and perennial pastures with lime (PP+). Soil water measurement was made using a neutron probe on one set of the treatments comprising four adjacent paddocks. Over three winter and spring periods, the results showed that perennial grass pastures, especially PP+, consistently extracted about 40 mm more soil water each year than did the annual grass pastures. As a result, surface runoff, sub-surface flow and deep drainage (percolation below 180 cm depth) were about 40 mm less from the perennial pastures. The soil water status of the four pasture treatments was simulated reasonably well using a simple soil water model. Together with the long-term simulation of deep drainage, using past meteorological records, it is shown that proper management of perennial pastures can reduce recharge to groundwater and make pastoral systems more sustainable in the high rainfall zone. However, to completely reduce recharge, more-deeply rooted plants or trees are needed. (author)

  12. Native Fish Sanctuary Project - Sanctuary Development Phase, 2007 Annual Report

    Science.gov (United States)

    Mueller, Gordon A.

    2007-01-01

    Notable progress was made in 2007 toward the development of native fish facilities in the Lower Colorado River Basin. More than a dozen facilities are, or soon will be, online to benefit native fish. When this study began in 2005 no self-supporting communities of either bonytail or razorback sucker existed. Razorback suckers were removed from Rock Tank in 1997 and the communities at High Levee Pond had been compromised by largemouth bass in 2004. This project reversed that trend with the establishment of the Davis Cove native fish community in 2005. Bonytail and razorback sucker successfully produced young in Davis Cove in 2006. Bonytail successfully produced young in Parker Dam Pond in 2007, representing the first successful sanctuary established solely for bonytail. This past year, Three Fingers Lake received 135 large razorback suckers, and Federal and State agencies have agreed to develop a cooperative management approach dedicating a portion of that lake toward grow-out and (or) the establishment of another sanctuary. Two ponds at River's Edge Golf Course in Needles, California, were renovated in June and soon will be stocked with bonytail. Similar activities are taking place at Mohave Community College, Cerbat Cliffs Golf Course, Cibola High Levee Pond, Office Cove, Emerald Canyon Golf Course, and Bulkhead Cove. Recruitment can be expected as fish become sexually mature at these facilities. Flood-plain facilities have the potential to support 6,000 adult razorback suckers and nearly 20,000 bonytail if native fish management is aggressively pursued. This sanctuary project has assisted agencies in developing 15 native fish communities by identifying specific resource objectives for those sites, listing and prioritizing research opportunities and needs, and strategizing on management approaches through the use of resource-management plans. Such documents have been developed for Davis Cove, Cibola High Levee Pond, Parker Dam Pond, and Three Fingers Lake. We

  13. Tono regional hydrogeological study project. Annual report 2004

    International Nuclear Information System (INIS)

    Iwatsuki, Teruki; Ota, Kunio; Takeuchi, Shinji; Amano, Kenji; Takeuchi, Ryuji; Saegusa, Hiromitsu; Osawa, Hideaki

    2005-09-01

    Tono Geoscience Center, Japan Nuclear Cycle Development Institute has been conducting a wide range of geoscientific research in order to build firm scientific and technological basis for the research and development of geological disposal. One of the geoscientific research programme is a Regional Hydrogeological Study (RHS) project in the Tono region, central Japan. This report mainly summarizes the results of research in DH-14 and DH-15 boreholes at Toki city and Mizunami city in fiscal year 2004 which were carried out to support and improve the results in fiscal year 2003. The research in the regional scale area shows the reliability of conceptual hydrogeological model and numerical simulation for the evaluation of regional hydrogeology. On the other hand, the geological and geophysical investigation, and borehole investigation during the surface-based investigations in the local scale area provide the pragmatic distribution of hydrogeological structure that may control regional groundwater hydrology. Hydrogeological simulations regarding the geological structure such as fault and hydrogeological property demonstrate the priority of investigation of geological structure for the evaluation of hydrogeology. The fault perpendicular to groundwater flow direction crucially affects on regional hydrology. Such fault is necessary to be investigated by priority. Hydrochemical investigation shows that chemical evolution process in this groundwater illustrated is mixing between groundwaters with different salinities. Principal component analysis and mass balance calculation reveal reliable chemistry of end-member waters for mixing. Regarding methodology development, the strategy and procedure of investigations are summarized based on the results of surface-based investigation. Moreover the multi interval monitoring system for water pressure and temperature has developed and started to monitor the in-situ condition of groundwater. The geology, geological structure, hydraulic

  14. Columbia River: Terminal fisheries research project. 1994 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  15. Annual report of the project CIS-03-95, `evaluation of actinide nuclear data`

    Energy Technology Data Exchange (ETDEWEB)

    Maslov, V.M. [Radiation Physics and Chemistry Problems Inst., Minsk-Sosny (Belarus)

    1997-03-01

    The evaluation of neutron data for {sup 243}Cm, {sup 245}Cm and {sup 246}Cm is made in the energy region from 10-5 eV up to 20 MeV. The results of the evaluation are compiled in the ENDF/B-VI format. This work is performed under the Project Agreement CIS-03-95 with the International Science and Technology Center (Moscow). This is the annual report of the project CIS-03-95. (author)

  16. Status of the HIE-ISOLDE Project at CERN

    CERN Document Server

    Kadi, Y; Blumenfeld, Y; Bravin, E; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Vandoni, G; Venturini Delsolaro, W; Voulot, D; Williams, L R

    2012-01-01

    The HIE-ISOLDE project represents a major upgrade of the ISOLDE facility with a mandate to significantly improve the quality and increase the intensity and energy of radioactive nuclear beams produced at CERN. The project will expand the experimental nuclear physics programme at ISOLDE by focusing on an upgrade of the existing REX linac with a 40 MV superconducting linac comprising thirty-two niobium-on-copper sputter-coated quarter-wave resonators housed in six cryomodules. The new linac will raise the energy of post-accelerated beams from 3 MeV/u to over 10 MeV/u. The upgrade will be staged to first deliver beam energies of 5.5 MeV/u using two high-β cryomodules placed downstream of REX, before the energy variable section of the existing linac is replaced with two low-β cryomodules and two additional high-β cryomodules are installed to attain over 10 MeV/u with full energy variability from as low as 0.45 MeV/u. An overview of the project including a status summary of the different R&D activities and ...

  17. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  18. Pacific Lamprey Research and Restoration Project : Annual Report 1999.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2001-10-01

    This report summarizes results of research activities conducted from 1996 through 1999. The findings in these chapters represent the efforts of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and collaborative efforts among other researchers working on Pacific lampreys (Lampetra tridentata) under this project. The findings in these chapters will help management and recovery of Pacific lampreys in the Columbia River Basin. Traditional Ecological Knowledge (TEK) of Pacific lampreys from tribal members within the Confederated Tribes of the Umatilla Indian Reservation was useful in gaining baseline life history information. Tribal members described harvesting two types of lampreys from spring through fall, the short brown type and the long dark type. Lamprey spawning distribution was from the mouth to the headwaters in the Umatilla River. Larval lampreys were observed in the mud and sand areas of the river. Tribal members observed major declines in lampreys within the Columbia River basin. Larval Pacific lampreys were distributed throughout the John Day River basin. Larval distribution in the other subbasins was patchy and limited to the lower reaches of the streams. Larval densities were highly variable in the Middle Fork John Day and North Fork John Day rivers, as opposed to the Main stem John Day River. Larval lengths varied little in the Middle Fork John Day and North Fork John Day rivers, but were highly variable in the Main stem John Day River. Larval abundance decreased as we moved upstream in the Columbia and Snake rivers. In addition, we found strong evidence for lack of larval recruitment as distance increased from the mouth of the Columbia River. We identified clinical indicators of stress in adult Pacific lampreys. Plasma glucose became elevated soon after acute stress and remained elevated for one week. Plasma lactate also became elevated by 30 minutes; however, it decreased to resting levels by one hour after application of the stressor

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  3. 76 FR 8293 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2011-02-14

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 8, 2011. AGENCY: Federal Energy Regulatory... for natural gas pipelines blanket construction certificates for each calendar year. DATES: Effective... of Subjects in 18 CFR Part 157 Administrative practice and procedure, Natural Gas, Reporting and...

  4. 77 FR 8724 - Natural Gas Pipelines; Project Cost and Annual Limits

    Science.gov (United States)

    2012-02-15

    ...] Natural Gas Pipelines; Project Cost and Annual Limits February 9, 2012. AGENCY: Federal Energy Regulatory... limits for natural gas pipelines blanket construction certificates for each calendar year. DATES: This... CFR Part 157 Administrative practice and procedure, Natural gas, Reporting and recordkeeping...

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  7. Malheur River Basin cooperative bull trout/redband trout research project, annual report FY 1999; ANNUAL

    International Nuclear Information System (INIS)

    Schwabe, Lawrence; Tiley, Mark

    2000-01-01

    The purpose of this study is to document the seasonal distribution of adult/sub-adult bull trout (Salvelinus confluentus) in the Malheur River basin. Due to the decline of bull trout in the Columbia Basin, the United States Fish and Wildlife Service listed bull trout as a threatened species in June 1998. Past land management activities; construction of dams; and fish eradication projects in the North Fork and Middle Fork Malheur River by poisoning have worked in concert to cumulatively impact native species in the Malheur Basin (Bowers et. al. 1993). Survival of the remaining bull trout populations is severely threatened (Buchanan 1997). 1999 Research Objects are: (1) Document the migratory patterns of adult/sub-adult bull trout in the North Fork Malheur River; (2) Determine the seasonal bull trout use of Beulah Reservoir and bull trout entrainment; and (3) Timing and location of bull trout spawning in the North Fork Malheur River basin. The study area includes the Malheur basin from the mouth of the Malheur River located near Ontario, Oregon to the headwaters of the North Fork Malheur River (Map 1). All fish collected and most of the telemetry effort was done on the North Fork Malheur River subbasin (Map 2). Fish collection was conducted on the North Fork Malheur River at the tailwaters of Beulah Reservoir (RK 29), Beulah Reservoir (RK 29-RK 33), and in the North Fork Malheur River at Crane Crossing (RK 69) to the headwaters of the North Fork Malheur. Radio telemetry was done from the mouth of the Malheur River in Ontario, Oregon to the headwaters of the North Fork Malheur. This report will reflect all migration data collected from 3/1/99 to 12/31/99

  8. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    Energy Technology Data Exchange (ETDEWEB)

    Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  9. Status of the Fermilab Energy Doubler/Saver project

    International Nuclear Information System (INIS)

    1977-01-01

    The possibility of building a ring of superconducting magnets was considered very early in the design of the Fermilab main accelerator. It was concluded that the technology of superconducting magnets was not at that time, sufficiently advanced. Therefore, the main ring was designed and built with conventional magnets. However, space was left in the main-ring tunnel for a future ring of superconducting magnets. The Energy Doubler/Saver (ED/S) was initiated in 1972 as a project to build a ring of superconducting magnets with the objective of dramatically increasing the research potential of the Fermilab accelerators. This was to be accomplished at a moderate cost and in such a manner as to make possible a significant saving of electrical energy. A description is given of the evolution of this program as well as give a status report of the Ed/S research and development program

  10. The SuperB Project: Status and the Physics Reach

    International Nuclear Information System (INIS)

    Neri, Nicola

    2012-01-01

    The SuperB experiment is a next generation Super Flavour Factory expected to accumulate 75 ab −1 of data at the Υ(4S) in five years of nominal running, and will be built at the recently established Cabibbo Laboratory on the outskirts of Rome. In addition to running data at the Υ(4S), SuperB will be able to accumulate data from the ψ(3770) up to the Υ(6S). A polarized electron beam enables unique physics opportunities at SuperB. The large samples of B, D and τ decays that will be recorded at SuperB can be used to provide both stringent constraints on new physics scenarios, and over-constraints on the Standard Model. We present the status of the project as well as the physics potential of SuperB.

  11. Status of the Fermilab Energy Doubler/Saver project

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The possibility of building a ring of superconducting magnets was considered very early in the design of the Fermilab main accelerator. It was concluded that the technology of superconducting magnets was not at that time, sufficiently advanced. Therefore, the main ring was designed and built with conventional magnets. However, space was left in the main-ring tunnel for a future ring of superconducting magnets. The Energy Doubler/Saver (ED/S) was initiated in 1972 as a project to build a ring of superconducting magnets with the objective of dramatically increasing the research potential of the Fermilab accelerators. This was to be accomplished at a moderate cost and in such a manner as to make possible a significant saving of electrical energy. A description is given of the evolution of this program as well as give a status report of the Ed/S research and development program.

  12. FAIR - Facility, Research Program and Status of the Project

    International Nuclear Information System (INIS)

    Majka, Z.

    2011-01-01

    The international Facility for Antiproton and Ion Research (FAIR) in Europe will provide a worldwide science community with a unique and technically innovative accelerator system to perform forefront research in the sciences concerned with the basic structure of matter, and in intersections with other fields. The facility will deliver an extensive range of primary and secondary particle beams from protons and their antimatter partners, antiprotons, to ion beams of all chemical elements up to the heaviest, uranium, with in many respects unique properties and intensities. The paper will include overview of the new facility design and research programs to be carried out there. The current status of the FAIR project will be also presented. (author)

  13. Karlsruhe Research Center, Nuclear Safety Research Project (PSF). Annual report 1994

    International Nuclear Information System (INIS)

    Hueper, R.

    1995-08-01

    The reactor safety R and D work of the Karlsruhe Research Centre (FZKA) has been part of the Nuclear Safety Research Projet (PSF) since 1990. The present annual report 1994 summarizes the R and D results. The research tasks are coordinated in agreement with internal and external working groups. The contributions to this report correspond to the status of early 1995. An abstract in English precedes each of them, whenever the respective article is written in German. (orig.) [de

  14. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  15. New capacity and the status of major projects

    International Nuclear Information System (INIS)

    Osborne, R.; Eastman, P.; Bajc, F.; Hawthorne, D.

    2003-01-01

    This session included highlights from from four guest speakers who were asked to comment on new electricity capacity in Ontario and the status of major projects. The summer of 2002 was one of the hottest on record in Ontario and presented a challenge for suppliers of electricity to meet demand. Some of the extra demand was met by interties. Imports provided 5 per cent of consumption in July and 8 per cent in August. TransAlta and ATCO are currently involved in 2 major projects to add generation capacity. In addition, Ontario Power Generation is getting more production from its existing nuclear plants and has made significant investment to get greater efficiency and increase safety margins at the plants. One panelist suggested that nuclear power is a key part of meeting Canada's Kyoto greenhouse reduction obligations. It was emphasized that market participants should allow time to let the market work and let a free market respond to price signals. It was argued that consumers expect and rely too much on low-cost electricity and are therefore not encouraged to conserve energy or look into new generation requirements. figs

  16. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  17. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    Science.gov (United States)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  18. Final Status Survey for the Largest Decommissioning Project on Earth

    International Nuclear Information System (INIS)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-01-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  19. Hood River and Pelton Ladder monitoring and evaluation project and Hood River fish habitat project : annual progress report 1999-2000.; ANNUAL

    International Nuclear Information System (INIS)

    Lambert, Michael B.; McCanna, Joseph P.; Jennings, Mick

    2001-01-01

    The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin. This annual report summarizes work for two consecutive contract periods: the fiscal year (FY) 1999 contract period was 1 October, 1998 through 30 September, 1999 and 1 October, 1999 through 30 September, 2000 for FY 2000. Work implemented during FY 1999 and FY 2000 included (1) acclimation of hatchery spring chinook salmon and hatchery summer and winter steelhead smolts, (2) spring chinook salmon spawning ground surveys on the West Fork Hood River (3) genetic analysis of steelhead and cutthroat[contractual service with the ODFW], (4) Hood River water temperature studies, (5) Oak Springs Hatchery (OSH) and Round Butte Hatchery (RBH) coded-wire tagging and clipping evaluation, (6) preparation of the Hood River Watershed Assessment (Coccoli et al., December 1999) and the Fish Habitat Protection, Restoration, and Monitoring Plan (Coccoli et al., February 2000), (7) project implementation of early action habitat protection and restoration projects, (8) Pelton Ladder evaluation studies, (9) management oversight and guidance to BPA and ODFW engineering on HRPP facilities, and (10) preparation of an annual report summarizing project objectives for FY 1999 and FY 2000

  20. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of

  1. Status of the tandem FEL project development in Israel

    International Nuclear Information System (INIS)

    Benzvi, I.; Sokolowski, J.; Jerby, E.; Chomski, D.; Ruschin, S.

    1989-01-01

    The authors report the status of a collaborative research project development aimed toward construction of an IR FEL based on the EN tandem electrostatic accelerator of the Weizmann Institute of Science. A preliminary feasibility demonstration project yielded encouraging progress in three aspects: (1) Electron gun and accelerator conversion: A 50-kV 1-A electron gun injector was designed, built, tested, and assembled on the 6-MeV tandem accelerator which was previously converted and conditioned to operate as an electron accelerator in a positively charged HV terminal configuration. Contrary to the configuration of the only electrostatic accelerator FEL demonstrated so far, the electron gun and multistage depressed collector are connected to the ground, and the wiggler is placed in the HV terminal of the straight geometry tandem accelerator. This configuration promises to provide a high current high quality e-beam. (2) Electron-beam transport: The first installation of the electron optical beam recovery system yielded transport efficiency of 80%. Substantial improvement is expected with planned electron optics modifications. An effect, highly significant for realizing long pulse (quasi-cw) FEL operation, was observed experimentally. Due to the damping effect of the accelerator column capacitance network, the voltage terminal stayed constant for milliseconds even with poor beam transport efficiency. This points to the possibility of developing a long pulse FEL which may operate at a single longitudinal mode. (3) Wiggler development: A conventional 4.4-cm period SmCo planar wiggler was acquired and evaluated using a recently constructed floating wire magnetic field measurement setup

  2. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  3. The status report on the nuclear data project in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, G.N.; Baek, W.Y.; Kang, H.S.; Choi, J.Y.; Cho, M.H.; Ko, I.S.; Namkung, W. [Pohang Accelerator Laboratory, POSTECH, Pohang (Korea, Republic of); Chang, J.H.

    1999-03-01

    The nuclear data project as one of the nation-wide nuclear R and D programs was launched by the Korea Atomic Energy Research Institute (KAERI) in 1996. Its main goals are to establish a nuclear data system, to construct the infrastructure for the nuclear data productions and evaluations, and to develop a highly reliable nuclear data system. In order to build the infrastructure for the nuclear data production, KAERI wants to build an intense pulsed neutron source by utilizing accelerator facilities, technologies, and manpower at the Pohang Accelerator Laboratory (PAL). The PAL proposed the Pohang Neutron Facility (PNF), which consists of a 100-MeV electron linac, a water-cooled Ta target, and at least three different time-of-flight (TOF) paths. The 100-MeV electron linac was designed and constructed based on experiences obtained from construction and operation of the 2-GeV linac at PAL. We report a status report on the nuclear data production and evaluation in Korea. (author)

  4. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  5. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lockwood, Jr., Neil [Kalispel Tribe of Indians, Usk, WA (United States); McLellan, Jason G [Washington Department of Fish and Wildlife, Spokane, WA (United States); Crossley, Brian [Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA (United States); O' Connor, Dick

    2001-01-01

    The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project

  6. Status Report: Mathematics Curriculum-Development Projects Today

    Science.gov (United States)

    Arithmetic Teacher, 1972

    1972-01-01

    Brief reports on the Cambridge Conference on School Mathematics, Comprehensive School Mathematics Program, Computer-Assisted Instruction Projects at Stanford, Individually Prescribed Instruction Project, The Madison Project, Mathematics/Science Learning System, MINNEMAST, and School Mathematics Study Group. (MM)

  7. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  8. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  9. General concept and present status of the AMS - project

    International Nuclear Information System (INIS)

    Stan-Sion, C.; Plostinaru, D.; Catana, L.; Radulescu, M.; Marinescu, L.; Dima, R.

    1998-01-01

    The Institute of Nuclear Physics and Engineering, IFIN-HH, Bucharest started in 1996 the Construction Project for an AMS facility in Bucharest. The Project is supported by the German-Romanian scientific cooperation project RUM-013-97. In the frame of this project, scientific research, construction activities of electronic and mechanical devices and activities for calibration and optimization were performed. The activities in this year are concentrated on experimental tests and optimization of the AMS analysis procedure and on improving the tandem acceleration and transmission capability. These are as follows: - construction and tests of a high current sputter source, with spherical ionizer and automatic many-sample changer. Experimental tests and measurements of emittance and beam profile; - construction of the Injector Platform; - construction and tests of a Bragg - charged particle detector; - calibration and optimization experiments of the AMS ensemble. The AMS facility is based on the 8 MV - FN tandem accelerator and has the following main components: the AMS ion injector, a Wien - velocity filter, a 60 angle bending magnet and the particle detection system. For heavy particle detection we constructed a Bragg ionization chamber. This should be used for standard AMS measurements. A specific part of the AMS facility represents the AMS injector deck. The main components are: the high current sputter source, the analyzing double focusing magnet, two optical systems, a four-slit beam defining system in front of the analyzing magnet and a four-slit aperture with remote controlled Faraday cup (for beam current integration of stable isotopes) after the magnet. Finally, the pre-acceleration tube (40 kV) connects the ensemble to the ground potential of the accelerator beam line. For AMS measurements, the sputter ion source is able to provide both high beam current and small beam emittance. These characteristics are necessary in order to achieve high analyzing

  10. Update on the status of the West Valley demonstration project

    International Nuclear Information System (INIS)

    Greeves, J.T.; Camper, L.W.; Orlando, D.A.; Glenn, C.J.; Buckley, J.T.; Giardina, P.A.

    2002-01-01

    From 1966 to 1972, under an Atomic Energy Commission (AEC) license, Nuclear Fuel Services (NFS) reprocessed 640 metric tons of spent fuel at its West Valley, New York, facility-, the only commercial spent fuel reprocessing plant in the U.S. The facility shut down in 1972, for modifications to increase its seismic stability and to expand its capacity. In 1976, without restarting the operation, NFS withdrew from the reprocessing business and returned control of the facilities to the site owner, the New York State Energy Research and Development Authority (NYSERDA). The reprocessing activities resulted in about 2.3 million liters (600,000 gallons) of liquid high-level waste (HLW) stored below ground in tanks, other radioactive wastes, and residual radioactive contamination. The West Valley site was licensed by AEC, and then the U.S. Nuclear Regulatory Commission (NRC), until 1981, when the license was suspended to execute the 1980 West Valley Demonstration Project (WVDP) Act. The WVDP Act outlines the responsibilities of the U.S. Department of Energy (DOE), NRC, and NYSERDA at the site, including the NRC's responsibility to develop decommissioning criteria for the site. The Commission published the final policy statement on decommissioning criteria for the WVDP at the West Valley site after considering comments from interested stakeholders. In that regard, the Commission prescribed the License Termination Rule (LTR) criteria for the WVDP at the West Valley site, reflecting the fact that the applicable decommissioning goal for the entire NRC-licensed site is compliance with the requirements of the LTR. This paper will describe the history of the site, provide an update of the status of the decommissioning of the site and an overview of the technical and policy issues facing Federal and State regulators and other stakeholders as they strive to complete the remediation of the site. (author)

  11. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  12. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  13. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O' Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-01-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan

  14. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2006-02-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The

  15. National health expenditure projections: modest annual growth until coverage expands and economic growth accelerates.

    Science.gov (United States)

    Keehan, Sean P; Cuckler, Gigi A; Sisko, Andrea M; Madison, Andrew J; Smith, Sheila D; Lizonitz, Joseph M; Poisal, John A; Wolfe, Christian J

    2012-07-01

    For 2011-13, US health spending is projected to grow at 4.0 percent, on average--slightly above the historically low growth rate of 3.8 percent in 2009. Preliminary data suggest that growth in consumers' use of health services remained slow in 2011, and this pattern is expected to continue this year and next. In 2014, health spending growth is expected to accelerate to 7.4 percent as the major coverage expansions from the Affordable Care Act begin. For 2011 through 2021, national health spending is projected to grow at an average rate of 5.7 percent annually, which would be 0.9 percentage point faster than the expected annual increase in the gross domestic product during this period. By 2021, federal, state, and local government health care spending is projected to be nearly 50 percent of national health expenditures, up from 46 percent in 2011, with federal spending accounting for about two-thirds of the total government share. Rising government spending on health care is expected to be driven by faster growth in Medicare enrollment, expanded Medicaid coverage, and the introduction of premium and cost-sharing subsidies for health insurance exchange plans.

  16. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  17. Analysis of the Status and Impacts of NCTR Projects

    Science.gov (United States)

    2012-08-01

    The National Center for Transit Research (NCTR) at the University of South Florida (USF) assessed the implementation status and identified the outcomes and impacts of the results of 30 Florida Department of Transportation -sponsored NCTR research pro...

  18. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  19. Hellsgate Big Game Winter Range Wildlife Mitigation Project : Annual Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Whitney, Richard P.; Berger, Matthew T.; Rushing, Samuel; Peone, Cory

    2009-01-01

    The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams. At present, the Hellsgate Project protects and manages 57,418 acres (approximately 90 miles2) for the biological requirements of managed wildlife species; most are located on or near the Columbia River (Lake Rufus Woods and Lake Roosevelt) and surrounded by Tribal land. To date we have acquired about 34,597 habitat units (HUs) towards a total 35,819 HUs lost from original inundation due to hydropower development. In addition to the remaining 1,237 HUs left unmitigated, 600 HUs from the Washington Department of Fish and Wildlife that were traded to the Colville Tribes and 10 secure nesting islands are also yet to be mitigated. This annual report for 2008 describes the management activities of the Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) during the past year.

  20. MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-01

    This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  8. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. Status of the project of Novosibirsk high power FEL

    Energy Technology Data Exchange (ETDEWEB)

    Pinayev, I.V.; Erg, G.I.; Gavrilov, N.G. [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)] [and others

    1995-12-31

    The project of IR FEL for the Siberian Center of photochemical researches is described. The distinguished features of this project are the use of the race-track microtron-recuperator and the {open_quotes}electron output of radiation{close_quotes}. The building for the machine is under reconstruction now. About half of hardware has been manufactured. The assembly of installation began.

  13. The ANGSTREM project: present status and development activities

    International Nuclear Information System (INIS)

    Stepanov, V.S.; Legyuenko, S.K.; Grigoriev, O.G.; Gromov, B.F.; Dedul, A.V.; Leonchyk, M.P.; Pashkin, Yu.G.; Pankratov, D.V.; Chekunov, V.V.; Skorikov, D.E.

    1998-01-01

    The project ANGSTREM of a modular-transportable nuclear power-and-heating station with assured safety for remote areas is described. The station is based on fast nuclear reactor cooling by a lead-bismuth eutectic. The possible evolution of the project is mentioned in relation to possible new application - sea water desalination or refrigeration plants. (author)

  14. Annual report on reactor safety research projects sponsored by the Ministry for Research and Technology of the Federal Republic of Germany. Reporting period 1993. Progress report

    International Nuclear Information System (INIS)

    1994-10-01

    The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the Forschungsbetreuung at the GRS, (FB) (Research Coordination Department), within the framework of general information of progress in reactor safety research. The individual reports are classified according to the same classification system as applied in the nuclear index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in sequence of their project numbers. (orig./HP)

  15. Status of the MCNPtrademark/LCStrademark merger project

    International Nuclear Information System (INIS)

    Hughes, H.G.; Adams, K.J.; Chadwick, M.B.; Comly, J.C.; Frankle, S.C.; Hendricks, J.S.; Little, R.C.; Prael, R.E.; Waters, L.S.; Young, P.G.

    1998-01-01

    The MCNPX code is now in limited release in a beta-test version. We provide a brief status report on the physics modules now in the code and of the enhanced capabilities to use new evaluated neutron data. We also present new benchmark calculations in which LAHET and MCNPX are compared with experimental results from the Japan Atomic Energy Research Institute

  16. Projected increases in the annual flood pulse of the western Amazon

    Science.gov (United States)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Veliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-04-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research due to its rich biodiversity and the significant role of rain forest in carbon cycling. Climate change has also direct hydrological impact, and there have been increasing efforts to understand such dynamics at continental and subregional scales such as the scale of the western Amazon. New projections from the Coupled Model Inter- comparison Project Phase 5 (CMIP5) ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the river. Using extremes value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 years. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100- year return floods). These findings are in agreement with previously projected increases in high extremes under the Special Report on Emissions Scenarios (SRES) climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amid a growing literature that more strongly emphasises future droughts and their impact on the viability of the rain forest system over the greater Amazonia.

  17. Present status of research within the International Project

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The short report enumerates the studies which are now completed by the International Project in the Field of Food Irradiation and the studies to be continued. New feeding studies with irradiated fish, rice, spices and mangoes are performed. (MG) [de

  18. Status and prospects of the FaCT project

    International Nuclear Information System (INIS)

    Nagaoki, Yoshihiro; Kikuchi, Shin; Ichimiya, Masakazu

    2008-01-01

    'Fast Reactor Cycle Technology Development (FaCT)' project has been conducted since 2006. In this project, design study and research and development (R and D) on innovative technologies for fast reactor (FR) cycle system are implemented in order to present the conceptual designs of commercial and demonstration facilities by 2015 and start operating demonstration fast reactor in 2025. The R and Ds has been stepped forward into the development stage to establish the realization of innovative technologies which bring excellent performance to fast reactor cycle system. The purpose of R and D by 2010 is to decide whether innovative technologies shall be adopted. So promoting R and D of FR, the project governance was organized. Furthermore, several possible R and D have been effectively carried out within the frameworks of international cooperation, such as Global Nuclear Energy Partnership (GNEP), Generation IV International Forum (GIF), and International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO). (author)

  19. The EFF Project Status and the NEA Nuclear Data Services

    International Nuclear Information System (INIS)

    Henriksson, H.; Kodeli, I.; Nordborg, C.; Forrest, R.; Batistoni, P.; Fischer, U.

    2006-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank is part of an international network of data centres in charge of the compilation and dissemination of basic nuclear data. Through its activities in the reaction data field, the NEA participates in the production of data and their distribution to its users. The NEA Data Bank administrates the collection and validation as well as the distribution of the Joint Evaluated Fusion and Fission (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), to JEFF with the latest release of the library, JEFF-3.1, in May 2005. The EFF Project is a collaborative project with work funded by the European Fusion Development Agreement (EFDA). The tasks within the project comprise new data evaluation and verification of activation and transport data, calculation methods and validation via integral experiments. The EFF project brings together all available expertise in Europe, relating to the nuclear data requirements of existing and future fusion devices. EFF contributed greatly to the successful release of the internationally recognised nuclear data library JEFF-3.1. The NEA Working Party on International Nuclear Data Evaluation Co-operation (WPEC) is established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations and validation. WPEC provides a framework for co-operative activities between the participating projects, such as the high priority request list that is a collection of experimental data requests of special interest in a certain project, such as JEFF or ITER. The NEA provides also computer program services for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments, such as SINBAD, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. (author)

  20. Progress, status, and plans for the HRIBF project

    International Nuclear Information System (INIS)

    Auble, R.L.; Alton, G.D.; Bailey, J.D.

    1995-01-01

    Over the last three years, the Holifield accelerator system has been reconfigured into a first-generation radioactive ion beam facility, the HRIBF, a national user facility for RIB research. The construction and reconfiguration have been completed and the equipment commissioning and beam development phases have started. The progress to date, the present status, and future plans will be given. The special problems connected with the production and acceleration of RIBs will be discussed

  1. Status of the Forward Physics Projects in ATLAS

    OpenAIRE

    Ask, Stefan

    2007-01-01

    The ATLAS experiment at the LHC is building several detector systems for forward physics studies and to determine the luminosity. The main forward systems consist of a Cerenkov detector called LUCID, a Zero Degree Calorimeter (ZDC) and Roman Pots which will house a scintillating fiber tracker system called ALFA. Here we report some of the forward physics activities that are foreseen in ATLAS together with the status of the related detector systems.

  2. Annual report on the US Department of Energy's cultural resource activities at Colorado UMTRA Project sites for October 1991--September 1992

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the US Department of Energy's (DOE) cultural resource studies that were undertaken in support of the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project in the state of Colorado for the period of October 1, 1991, through September 30, 1992. This report fulfills the DOE's obligation to provide an annual report to the state of Colorado on the status and results of cultural resource studies conducted during the above period of record. This requirement is stated in a programmatic memorandum of agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Previous reports were based on a calendar year reporting period. However, in order to be more consistent with the programmatic memorandum of agreement, the period of record for this and subsequent annual reports has been changed to the Federal fiscal year. The current status and summaries of 1992 cultural resource surveys are provided for all UMTRA Project sites in Colorado. The sites are Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock

  3. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  4. Mizunami Underground Research Laboratory Project. Annual report for fiscal year 2015

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Iwatsuki, Teruki; Matsui, Hiroya; Mikake, Shinichiro; Ishibashi, Masayuki; Onoe, Hironori; Takeuchi, Ryuji; Nohara, Tsuyoshi; Sasao, Eiji; Ikeda, Koki; Koide, Kaoru

    2016-12-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the research program and management system revision of the entire JAEA organization in 2014, JAEA identified three important issues on the geoscientific research program: 'Development of countermeasure technologies for reducing groundwater inflow', 'Development of modeling technologies for mass transport' and 'Development of drift backfilling technologies', based on the latest results of the synthesizing research and development (R and D). The R and D on three important issues has been carrying out on the MIU project. In this report, the current status of R and D activities and construction in 2015 is summarized. (author)

  5. Commercial Supersonics Technology Project - Status of Airport Noise

    Science.gov (United States)

    Bridges, James

    2016-01-01

    The Commercial Supersonic Technology Project has been developing databases, computational tools, and system models to prepare for a level 1 milestone, the Low Noise Propulsion Tech Challenge, to be delivered Sept 2016. Steps taken to prepare for the final validation test are given, including system analysis, code validation, and risk reduction testing.

  6. The EFF project status and the NEA nuclear data services

    Energy Technology Data Exchange (ETDEWEB)

    Henriksson, H. [OECD Nuclear Energy Agency, 12 Blvd des Iles, 92130 Issy-les-Moulineaux (France)], E-mail: henriksson@nea.fr; Batistoni, P. [Associazione Euratom-ENEA sulla Fusione, Via E. Fermi 45, 00044 Frascati (Italy); Fischer, U. [Association FZK-Euratom, Postfach 3640, 76021 Karlsruhe (Germany); Forrest, R. [Euratom/UKAEA Fusion Association, Culham Science Centre, Oxfordshire OX14 3DB (United Kingdom); Kodeli, I.; Nordborg, C. [OECD Nuclear Energy Agency, 12 Blvd des Iles, 92130 Issy-les-Moulineaux (France)

    2007-10-15

    The OECD Nuclear Energy Agency (NEA) Data Bank participates in the production of data and their distribution to users including the collection and validation as well as the distribution of the Joint Evaluated Fission and Fusion (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), with the release of JEFF-3.1, in May 2005. The NEA also provides tools for the EFF project, such as computer codes for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments collected in the SINBAD database, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. In this paper an overview will be given of the NEA, and some examples of nuclear data services offered, such as the SINBAD database. JANIS, a display program evaluated and experimental data developed at the NEA will be mentioned briefly. The main emphasis will be given to the EFF project including the contents of the new JEFF-3.1 library, released in May 2005. Examples of recent work are given as well as a discussion on the forth-coming evaluation efforts among the EFF collaborators.

  7. The EFF project status and the NEA nuclear data services

    International Nuclear Information System (INIS)

    Henriksson, H.; Batistoni, P.; Fischer, U.; Forrest, R.; Kodeli, I.; Nordborg, C.

    2007-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank participates in the production of data and their distribution to users including the collection and validation as well as the distribution of the Joint Evaluated Fission and Fusion (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), with the release of JEFF-3.1, in May 2005. The NEA also provides tools for the EFF project, such as computer codes for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments collected in the SINBAD database, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. In this paper an overview will be given of the NEA, and some examples of nuclear data services offered, such as the SINBAD database. JANIS, a display program evaluated and experimental data developed at the NEA will be mentioned briefly. The main emphasis will be given to the EFF project including the contents of the new JEFF-3.1 library, released in May 2005. Examples of recent work are given as well as a discussion on the forth-coming evaluation efforts among the EFF collaborators

  8. Present status and future development of Qinshan nuclear power project

    International Nuclear Information System (INIS)

    Ouyang Yu

    1987-01-01

    Qinshan 300 MWe Nuclear power Project is the first domestically designed and constructed nuclear power plant in China. Here is a brief description of its progress in design work, equipment manufacture and site construction since the first structural concrete in March 1985. In Qinshan area four units of 600 MWe each are planned to be built with collaboration of proper foreign partners. (author)

  9. The Eurodif program. Present status of the project

    International Nuclear Information System (INIS)

    Besse, G.

    1975-01-01

    The reasons which led Eurodif to decide for the gaseous diffusion process and the benefits which such process offers for the present time are presented. The realization of the Eurodif project (description of the plant, time schedule of the realization, electric power supply, production time-schedule) is discussed. The Eurodif marketing policy, present and future, is reported [fr

  10. RIKEN radioactive isotope beam factory project – Present status and ...

    Indian Academy of Sciences (India)

    Programs for studying nuclear reactions and structure of exotic nuclei available at the RIKEN radioactive isotope beam factory project are introduced and discussed by demonstrating recent highlights. Special emphasis ... RIKEN Nishina Center for Accelerator-Based Science, 2-1 Hirosawa, Wako, Saitama 351-0198, Japan ...

  11. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  12. Status and further plans for the Halden project MMS activities

    International Nuclear Information System (INIS)

    Oewre, Fridtjov

    2004-01-01

    The Halden Reactor Project is a joint undertaking of nuclear organizations in 19 countries sponsoring a jointly financed research programme under the auspices of the OECD NEA. The programme is renewed every third year. The three main research areas at the Halden Project are: Fuels-, Materials- and Man-Machine Systems (MMS) research. The MMS research addresses issues related to human-machine interaction in computerized control rooms as well as the development and test of new technology related to safe and reliable operation of nuclear power plants. The MMS research at the Halden Project is closely tied with experimental work in two laboratories constituting what is now called the MTO-labs (MTO=Man-Technology-Organization). The new MTO-lab building was opened in the spring 2004. One of the laboratories is the nuclear simulator-based Halden Man-Machine Laboratory (HAMMLAB). The other laboratory is called the Halden Virtual Reality Centre (HVRC). The paper first introduces the new MTO-lab and outlines Halden's capabilities of perform MMS research. Furthermore the paper discusses three selected topics addressed within the current Halden MMS programme focusing on our approach to obtain data for human reliability assessment, the work on design and evaluation of innovative human system interfaces and our work on integrated wearable computing technologies for field operators. A short overview of our plans for future research as part of the international Halden Reactor Project concludes the paper. (author)

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    Science.gov (United States)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  16. Present status and plans of JENDL FP data evaluation project

    International Nuclear Information System (INIS)

    Kawano, Toshihiko

    2003-01-01

    The Fission Product (FP) data evaluation is one of the key issues for the next revision of JENDL, since many data were carried over from JENDL-3.2 to 3.3. The new FP Working Group (FPWG) was organized in the Japanese Nuclear Data Committee (JNDC) to perform new evaluations of FP data for JENDL. In the present review of FP data evaluation, we show the history and current status of FP nuclear data, requirements of FP data, new measurements, the international cooperation, and the future plans toward the new JENDL. (author)

  17. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  18. Status of the ATLAS Positive-Ion Injector Project

    International Nuclear Information System (INIS)

    Pardo, R.C.; Benaroya, R.; Billquist, P.J.

    1987-01-01

    The goal of the Argonne Positive Ion Injector project is to replace the ATLAS tandem injector with a facility which will increase the beam currents presently available by a factor of 100 and to make available at ATLAS essentially all beams including uranium. The beam quality expected from the facility will be at least as good as that of the tandem based ATLAS. The project combines two relatively new technologies - the electron cyclotron resonance ion source, which provides high charge state ions at microampere currents, and RF superconductivity which has been shown to be capable of generating accelerating fields as high as 10 MV/m, resulting in an essentially new method of acceleration for low-energy heavy ions. 5 refs., 7 figs., 1 tabs

  19. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  20. Next Generation Nuclear Plant Project 2009 Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick; Jim Kinsey; Keith Perry; Dave Petti

    2010-05-01

    The mission of the NGNP Project is to broaden the environmental and economic benefits of nuclear energy technology to the United States and other economies by demonstrating its applicability to market sectors not served by light water reactors (LWRs). Those markets typically use fossil fuels to fulfill their energy needs, and high temperature gas-cooled reactors (HTGRs) like the NGNP can reduce this dependence and the resulting carbon footprint.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  2. Projected Changes in the Annual Cycle of Precipitation over Central Asia by CMIP5 Models

    Science.gov (United States)

    Yu, X.; Zhao, Y.

    2017-12-01

    Future changes in the annual cycle of the precipitation in central Asia (CA) were estimated based on the historical and Representative Concentration Pathway 8.5 (RCP8.5) experiments from 25 models of the Coupled Model Intercomparison Project phase 5 (CMIP5). Compared with the Global Precipitation Climatology Project (GPCP) observations, the historical (1979-1999) experiments showed that most models can capture the migration of rainfall centers, but remarkable discrepancies exist in the location and intensity of rainfall centers between simulations and observations. Considering the skill scores of precipitation and pattern correlations of circulations, which are closely related to the precipitation for each month, for the 25 models, the four best models (e.g., CanESM2, CMCC-CMS, MIROC5 and MPI-ESM-LR) with relatively good performance were selected. The four models' ensemble mean indicated that the migration and location of the precipitation centers were better reproduced, except the intensity of the centers was overestimated, compared with the result that only considered precipitation. Based on the four best models' ensemble mean under RCP8.5 scenarios, precipitation was projected to increase dramatically over most of the CA region in the boreal cold seasons (November, December, January, February, March, April and May) with the maximum in December in the end of twenty-first century (2079-2099), and several positive centers were located in the Pamirs Plateau and the Tianshan Mountains. By contrast, the precipitation changes were weak in the boreal warm seasons (June, July, August, September and October), with a wet center located in the northern Himalayas. Furthermore, there remain some uncertainties in the projected precipitation regions and periods obtained by comparing models' ensemble results of this paper and the results of previous studies. These uncertainties should be investigated in future work.

  3. Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

    Science.gov (United States)

    Carlisle, Candace

    2018-01-01

    TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

  4. Status of the Munich compact core reactor project

    International Nuclear Information System (INIS)

    Boening, K.; Glaeser, W.; Meier, J.; Rau, G.; Roehrmoser, A.; Steichele, E.

    1991-01-01

    A new national, high performance research reactor is being planned in Munich which shall provide an unperturbed thermal neutron flux of about 8.10 14 cm -2 s -1 at only 20 MW power. This object can be achieved with the concept of a small, light water cooled 'compact core' situated in the center of a large heavy water moderator tank. In the first part of this paper an overview is given on the status of the necessary fuel enrichment is discussed. In becomes clear that the potential of the compact core concept can only be developed without compromises when using highly enriched uranium in combination with the new high density fuel. (orig.)

  5. Status and outlook of the CRYRING@ESR project

    Energy Technology Data Exchange (ETDEWEB)

    Geithner, W., E-mail: w.geithner@gsi.de; Andelkovic, Z.; Beck, D.; Bräuning, H.; Bräuning-Demian, A. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Danared, H. [European Spallation Source ESS (Sweden); Dimopoulou, C. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Engström, M. [Fysikum, Stockholm University (Sweden); Fedotova, S.; Gorda, O.; Herfurth, F.; Hess, R. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Källberg, A. [Fysikum, Stockholm University (Sweden); Kleffner, C.; Kotovskiy, N.; Kraus, I.; Lestinsky, M.; Litvinov, S.; Nolden, F.; Reiter, A. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); and others

    2017-11-15

    Once operational, CRYRING@ESR will store and decelerate ions delivered by the experimental storage ring ESR at energies well below those of ESR. In addition to that, CRYRING@ESR has an electron cooler operating with an ultracold electron beam, allowing to provide cooled ion beams for precision experiments. These ions will be delivered to a broad range of experiments presently in preparation; either in-ring or extracted to a dedicated beamline for experiments. An overview and status report of the installation and commissioning of the CRYRING-@ESR storage ring for highly charged ions at the GSI Helmholtzzentrum für Schwerionenforschung is presented. The installation of this storage ring started in 2014 and was completing end of 2016, when this publication was written.

  6. Status of the Dark Energy Survey Camera (DECam) Project

    Energy Technology Data Exchange (ETDEWEB)

    Flaugher, Brenna L.; Abbott, Timothy M.C.; Angstadt, Robert; Annis, Jim; Antonik, Michelle, L.; Bailey, Jim; Ballester, Otger.; Bernstein, Joseph P.; Bernstein, Rebbeca; Bonati, Marco; Bremer, Gale; /Fermilab /Cerro-Tololo InterAmerican Obs. /ANL /Texas A-M /Michigan U. /Illinois U., Urbana /Ohio State U. /University Coll. London /LBNL /SLAC /IFAE

    2012-06-29

    The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

  7. Status of the Dark Energy Survey Camera (DECam) project

    Energy Technology Data Exchange (ETDEWEB)

    Flaugher, Brenna L.; McLean, Ian S.; Ramsay, Suzanne K.; Abbott, Timothy M. C.; Angstadt, Robert; Takami, Hideki; Annis, Jim; Antonik, Michelle L.; Bailey, Jim; Ballester, Otger; Bernstein, Joseph P.; Bernstein, Rebecca A.; Bonati, Marco; Bremer, Gale; Briones, Jorge; Brooks, David; Buckley-Geer, Elizabeth J.; Campa, Juila; Cardiel-Sas, Laia; Castander, Francisco; Castilla, Javier; Cease, Herman; Chappa, Steve; Chi, Edward C.; da Costa, Luis; DePoy, Darren L.; Derylo, Gregory; de Vincente, Juan; Diehl, H. Thomas; Doel, Peter; Estrada, Juan; Eiting, Jacob; Elliott, Anne E.; Finley, David A.; Flores, Rolando; Frieman, Josh; Gaztanaga, Enrique; Gerdes, David; Gladders, Mike; Guarino, V.; Gutierrez, G.; Grudzinski, Jim; Hanlon, Bill; Hao, Jiangang; Holland, Steve; Honscheid, Klaus; Huffman, Dave; Jackson, Cheryl; Jonas, Michelle; Karliner, Inga; Kau, Daekwang; Kent, Steve; Kozlovsky, Mark; Krempetz, Kurt; Krider, John; Kubik, Donna; Kuehn, Kyler; Kuhlmann, Steve E.; Kuk, Kevin; Lahav, Ofer; Langellier, Nick; Lathrop, Andrew; Lewis, Peter M.; Lin, Huan; Lorenzon, Wolfgang; Martinez, Gustavo; McKay, Timothy; Merritt, Wyatt; Meyer, Mark; Miquel, Ramon; Morgan, Jim; Moore, Peter; Moore, Todd; Neilsen, Eric; Nord, Brian; Ogando, Ricardo; Olson, Jamieson; Patton, Kenneth; Peoples, John; Plazas, Andres; Qian, Tao; Roe, Natalie; Roodman, Aaron; Rossetto, B.; Sanchez, E.; Soares-Santos, Marcelle; Scarpine, Vic; Schalk, Terry; Schindler, Rafe; Schmidt, Ricardo; Schmitt, Richard; Schubnell, Mike; Schultz, Kenneth; Selen, M.; Serrano, Santiago; Shaw, Terri; Simaitis, Vaidas; Slaughter, Jean; Smith, R. Christopher; Spinka, Hal; Stefanik, Andy; Stuermer, Walter; Sypniewski, Adam; Talaga, R.; Tarle, Greg; Thaler, Jon; Tucker, Doug; Walker, Alistair R.; Weaverdyck, Curtis; Wester, William; Woods, Robert J.; Worswick, Sue; Zhao, Allen

    2012-09-24

    The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

  8. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Green, Gerald I.; Coeur D' Alene Tribe.

    2002-06-01

    proposed implementation activities are conducted in the headwaters of the system and are expected to prove beneficial to the natural functions of the entire Hangman Watershed. The following is the FY2001 annual report of Project activities and is submitted as partial fulfillment of Operation and Maintenance Task 2.a. The Objectives and Tasks for this first year were designed to position this Project for a long-term habitat restoration effort. As such, efforts were largely directed at information gathering and project orientation. The major task for this first year was development of a Habitat Prioritization Plan (attached) to guide implementation efforts by selecting areas that will be of greatest benefit to the native ecology. Completion of the first year tasks has positioned the project to move forward with implementing restoration activities using the latest information to accomplish the greatest possible results. The Project will be looking to implement on-the-ground protection and restoration efforts in the coming fiscal year using the data and information gathered in the last fiscal year. Continually refining our understanding of the natural watershed functions and fish and wildlife habitats within the Project Area will result in an increase in the efficiency of project implementation. Research and data gathering efforts will remain a strong emphasis in the coming fiscal year, as it will throughout the life of this Project.

  9. Wind River Watershed Restoration Project; Underwood Conservation District, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jim

    2004-02-01

    The goal of the Wind River project is to preserve, protect and restore Wind River steelhead. In March, 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia as 'threatened' under the Endangered Species Act. In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical. Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery and restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative. The Wind River Project includes four cooperating agencies. Those are the Underwood Conservation District (UCD), United States Geological Service (USGS), US Forest Service (USFS), and Washington State Department of Fish & Wildlife (WDFW). Tasks include monitoring steelhead populations (USGS and WDFW), Coordinating a Watershed Committee and Technical Advisory Group (UCD), evaluating physical habitat conditions (USFS and UCD), assessing watershed health (all), reducing road sediments sources (USFS), rehabilitating riparian corridors, floodplains, and channel geometry (UCD, USFS), evaluate removal of Hemlock Dam (USFS), and promote local watershed stewardship (UCD, USFS). UCD's major efforts have included coordination of the Wind River Watershed Committee and Technical Advisory Committee (TAC), water temperature and water chemistry monitoring, riparian habitat improvement projects, and educational activities. Our coordination work enables the local Watershed Committee and TAC to function and provide essential input to Agencies, and our habitat improvement work focuses on riparian revegetation. Water chemistry and temperature data collection provide information for monitoring watershed conditions and fish habitat, and are comparable with data gathered in previous years. Water chemistry information collected on Trout Creek should, with 2 years data, determine whether pH levels make conditions

  10. The SuperB factory, physics potential and project status

    Directory of Open Access Journals (Sweden)

    Wiechczynski Jaroslaw

    2012-12-01

    Full Text Available The SuperB project is an international enterprise aiming at the construction of the high-luminosity asymmetric beam energy electron-positron accelerator, which would be located in the area of Rome. It would exploit several novel features allowing to achieve an unprecedented luminosities and to collect almost a hundred times more data than the current generation of ”B factories”. As for the leptonic colliders, it will maintain a clean, low-background experimental environment that is crucial for numerous measurements on the field of high energy physics

  11. Ferrocyanide Safety Project Task 3 Ferrocyanide Aging Studies FY 1993 annual report

    International Nuclear Information System (INIS)

    Lilga, M.A.; Lumetta, M.R.; Schiefelbein, G.F.

    1993-10-01

    The Hanford Ferrocyanide Task Team is addressing issues involving ferrocyanide precipitates in single-shell waste storage tanks (SSTs), in particular the storage of waste in a safe manner. This Task Team, composed of researchers from Westinghouse Hanford Company (WHC), Pacific Northwest Laboratory (PNL), and outside consultants, was formed in response to the need for an updated analysis of safety questions about the Hanford ferrocyanide tanks. The Ferrocyanides Safety Project at PNL is part of the Waste Tank Safety Program led by WHC. The overall purpose of the WHC program, sponsored by the US Department of Energy's Tank Farm Project Office, is to (1) maintain the ferrocyanide tanks with minimal risk of an accident, (2) select one or more strategies to assure safe storage, and (3) close out the unreviewed safety question (USQ). This annual report gives the results of the work conducted by PNL in FY 1993 on Task 3, Ferrocyanides Aging Studies, which deals with the aging behavior of simulated ferrocyanide wastes. Aging processes include the dissolution and hydrolysis of nickel ferrocyanides in high pH aqueous solutions. Investigated were the effects of pH variation; ionic strength and sodium ion concentration; the presence of anions such as phosphate, carbonate, and nitrate; temperature; and gamma radiation on solubility of ferrocyanide materials including In-Farm-lA, Rev. 4 flowsheet-prepared Na 2 NiFe(CN) 6

  12. Semi-annual status report of the Canadian Nuclear Fuel Waste Management Program, April 1--September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Wright, E. D. [comp.

    1992-02-01

    This report is the eleventh in a series of semi-annual status reports on the research and development program for the safe management and disposal of Canada's nuclear fuel waste. it describes progress achieved in the three major subprograms, engineered systems, natural systems and performance assessment, from 1991 April 1 to September 30. It also gives a brief description of the activities being carried out in preparation for the public and governmental review of the disposal concept. Since 1987, this program has been jointly funded by AECL and Ontario Hydro under the auspices of the CANDU Owners Group (COG).

  13. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  14. The PALLAS research and isotope reactor project status

    International Nuclear Information System (INIS)

    Van Der Schaaf, B.; De Jong, P.

    2010-01-01

    In the European Union the first generation research reactors is nearing their end of life condition. Several committees recommend a comprehensive set of reactors in the EU, amongst them the replacement for the HFR research and isotope reactor in Petten: PALLAS. The business case for PALLAS supports a future for a research and isotope reactor in Petten as a perfect fit for the future EU set of test reactors. The tender for PALLAS started in 2007, following the EU rules for tendering complex objects with the competitive dialogue. This procedure involved an extensive consultation phase between individual tendering companies and NRG, resulting in definitive specifications in summer 2008. The evaluation of offers, including conceptual designs, took place in summer 2009. At present NRG is still active in the acquisition of the funding for the project. The licensing path has been started in autumn 2009 with a initiation note on the environmental impact assessment, EIA. The public hearings held in the lead to the advice from the national EIA committee for the approach of the assessment. The PALLAS project team in Petten will guide the design and build processes. It is also responsible for the licensing of the building and operation of PALLAS. The team also manages the design and construction for the infrastructure, such as cooling devices, including remnant heat utilization, and utility provisions. A particular responsibility for the team is the design and construction of experimental and isotope capsules, based on launch customer requirements. (author)

  15. DELSY project: status and development Dubna Electron Synchrotron

    CERN Document Server

    Balalykin, N; Bykovsky, V

    2003-01-01

    The DELSY (Dubna Electron Synchrotron) project is under development at the Joint Institute for Nuclear Research. It is based on an acceleration facility donated to the Joint Institute for Nuclear Research by the Institute for Nuclear and High Energy Physics (NIKHEF, Amsterdam). The NIKHEF accelerator facility consists of the linear electron accelerator MEA, which has an electron energy of 700 MeV, and the electron storage ring AmPS, with a maximum energy of 900 MeV and a beam current of 200 mA. There are three phases to the construction of the DELSY facility. Phase I will be accomplished with the construction of a complex of free-electron lasers covering continuously the spectrum from the far infrared down to the ultraviolet (approx 150 nm). Phase II will be accomplished with the commissioning of the storage ring DELSY. Complete commissioning of the DELSY project will take place after finishing Phase III, the construction of an X-ray free-electron laser. This phase is considered as the ultimate goal of the pr...

  16. Present status of some technological activities supporting the MOLCARE project

    Energy Technology Data Exchange (ETDEWEB)

    Torazza, A. [Ansaldo Ricerche S.r.l., Genova (Italy); Rocchini, G. [ENEL, Milano (Italy); Scagliotti, M. [CISE, Milano (Italy)

    1996-12-31

    The development of MCFC stack technology is carried out at Ansaldo Ricerche in the framework of the MOLCARE project, a cooperation with Spanish companies under a partial UE funding, while a specific research program concerning the physico-chemical characterization of materials is performed jointly by CISE and ENEL. The project includes the development, the construction and the testing of a full scale 100 kW prototype, the assessment of stack technology on subscale stacks, the mathematical modelling of the MCFC based plants and the basic researches. The aim of the basic researches, carried out on single cells, is to improve the effectiveness and durability of both the active and the hardware materials. The Ansaldo stack technology is based on external manifolding. The full scale 100 kW prototype will be integrated with the sensible heat reformer and other ancillary equipments according to the {open_quote}Compact Unit (CU){close_quotes} concept. These technical choices stress requirements for manifold gasket configuration. electrolyte migration control, {Delta}p management and porous component compaction.

  17. Status of the object-oriented EGS interface project

    International Nuclear Information System (INIS)

    Yacout, A.M.; Dunn, W.L.; Nelson, W.R.; Lui, P.; Bielajew, A.F.; Hirayama, H.; Namito, Y.

    2000-01-01

    The object-oriented EGS interface project seeks to simplify - using modern object-oriented and visual user interface techniques - the geometry and scoring aspects of the process of running the EGS code. The project will create an extremely user-friendly EGS package that retains and exploits the well documented physics advantages of EGS but removes the requirement that the user write HOWFAR and AUSGAB subroutines to define the geometry and scoring aspects of each new problem. In addition, several physics enhancements will be incorporated in EGS5. Although EGS5 will be able to be used in the traditional way - in a stand-alone fashion with users writing their own geometry and scoring subroutines - it is designed to be used in a completely new way - linked to a user interface through which users can manage all aspects of problem specification and code operation. This paper concentrates on the object-oriented user interface, which will dramatically simplify defining problem-specific detail for EGS. The 'EGS5 + VUI1' package will allow users to solve independent problems by run-time linking of the EGS5 code with class libraries that encapsulate the geometry and scoring aspects of each problem. Some simple example problems are considered in order to illustrate features of the EGS5 + VUI1 package. (author)

  18. Evaluate Status of Pacific Lamprey in the Clearwater River Drainage, Idaho: Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Cochnauer, Tim; Claire, Christopher

    2002-12-01

    Recent decline of Pacific lamprey Lampetra tridentata adult migrants to the Snake River drainage has focused attention on the species. Adult Pacific lamprey counted passing Ice Harbor Dam fishway averaged 18,158 during 1962-69 and 361 during 1993-2000. Human resource manipulations in the Snake River and Clearwater River drainages have altered ecosystem habitat in the last 120 years, likely impacting the productive potential of Pacific lamprey habitat. Timber harvest, stream impoundment, road construction, grazing, mining, and community development have dominated habitat alteration in the Clearwater River system and Snake River corridor. Hydroelectric projects in the Snake River corridor impact juvenile/larval Pacific lamprey outmigrants and returning adults. Juvenile and larval lamprey outmigrants potentially pass through turbines, turbine bypass/collection systems, and over spillway structures at the four lower Snake River hydroelectric dams. Clearwater River drainage hydroelectric facilities have impacted Pacific lamprey populations to an unknown degree. The Pacific Power and Light Dam on the Clearwater River in Lewiston, Idaho, restricted chinook salmon Oncorhynchus tshawytscha passage in the 1927-1940 period, altering the migration route of outmigrating Pacific lamprey juveniles/larvae and upstream adult migrants (1927-1972). Dworshak Dam, completed in 1972, eliminated Pacific lamprey spawning and rearing in the North Fork Clearwater River drainage. Construction of the Harpster hydroelectric dam on the South Fork of the Clearwater River resulted in obstructed fish passage 1949-1963. Through Bonneville Power Administration support, the Idaho Department of Fish and Game continued investigation into the status of Pacific lamprey populations in Idaho's Clearwater River drainage in 2001. Trapping, electrofishing, and spawning ground redd surveys were used to determine Pacific lamprey distribution, life history strategies, and habitat requirements in the South

  19. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  20. Status report on the Star Fire railgun development project

    International Nuclear Information System (INIS)

    Hawke, R.S.; Asay, J.R.

    1988-01-01

    The Star Fire Project is a joint SNLA/LLNL effort to develop a combined two-stage light-gas gun (2SLGG) and railgun into a three-stage hypervelocity launcher for equation-of-state (EOS) research. The 2SLGG is used to accelerate a projectile to a velocity of 6-9 km/s. The railgun serves as the third stage to further accelerate the projectile. The high injection velocity will minimize barrel ablation and armature contamination. Hydrogen is used as the injection gas and serves to reduce the probability of forming secondary arcs. VISAR is used for continuous precision projectile velocity measurement. This paper discusses the results of armature formation tests, the use of the railgun stage to increase projectile velocity, and armature diagnostic measurements

  1. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1995

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1996-02-01

    This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the US Department of Energy's Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1994 and September 1995. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides

  2. Annual report for RCRA groundwater monitoring projects at Hanford site facilities for 1994

    International Nuclear Information System (INIS)

    1995-02-01

    This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the U.S. Department of Energy's Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1993 and September 1994. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides

  3. The DIII-D Radiative Divertor Project: Status and plans

    International Nuclear Information System (INIS)

    Smith, J.P.; Baxi, C.B.; Bozek, A.S.

    1996-10-01

    New divertor hardware is being designed and fabricated for the Radiative Divertor modification of the DIII-D tokamak. The installation of the hardware has been separated into two phases, the first phase starting in October of 1996 and the second and final phase, in 1998. The phased approach enables the continuation of the divertor characterization research in the lower divertor while providing pumping for density control in high triangularity, single- or double-null advanced tokamak discharges. When completed, the Radiative Divertor Project hardware will provide pumping at all four strike points of a double-null, high triangularity discharge and provide baffling of the neutral particles from transport back to the core plasma. By puffing neutral gas into the divertor region, a reduction in the heat flux on the target plates will be be demonstrated without a large rise in core density. This reduction in heat flux is accomplished by dispersing the power with radiation in the divertor region. Experiments and modeling have formed the basis for the new design. The capability of the DIII-D cryogenic system is being upgraded as part of this project. The increased capability of the cryogenic system will allow delivery of liquid helium and nitrogen to three new cryopumps. Physics studies on the effects of slot width and length can be accomplished easily with the design of the Radiative Divertor. The slot width can be varied by installing graphite tiles of different geometry. The change in slot length, the distance from the X-point to the target plate, requires relocating the structure vertically and can be completed in about 6-8 weeks. Radiative Divertor diagnostics are being designed to provide comprehensive measurements for diagnosing the divertor. Required diagnostic modifications will be minimal for Phase 1, but extensive for Phase 2 installation. These Phase 2 diagnostics will be required to fully diagnose the high triangularity discharges in the divertor slots

  4. Status of annual plant species in the Baneberry fallout pattern first and sixth years after initial irradiation

    International Nuclear Information System (INIS)

    Rhoads, W.A.

    1977-01-01

    At Project Baneberry on December 18, 1970, there was an accidental venting of radioactive debris into the environment which resulted in the irradiation of vegetation about 1.5 km to the north with doses estimated to reach a maximum of 6.2 K rads, beta plus gamma. At the highest doses, 35 percent of the dominant shrub in the area, Coleogyne (black brush), were killed and 65% severely damaged; and at lesser doses there was correspondingly less damage. Other species of shrubs were also affected. Grayia spinosa showed a low frequency of stem fasciation at the higher doses as well as other manifestations of radiation damage. In June 1971, the annual plant species which were probably small seedlings at fallout time were more frequently absent from the higher radiation areas than in the lower. At the same time, there was a greater frequency of higher dry weights produced by annuals at the higher radiation exposures. The frequency of occurrence of annuals varied from means of 8.5/m 2 at the higher doses to 24.3/m 2 at the lower doses. In June 1976, five years after irradiation, there were 300 to 400 plants/m 2 . By extrapolating the plants/m 2 against dose back to zero plants/m 2 , some indication of radiation doses which might destroy all annuals was derived

  5. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  6. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  7. Studies in Teaching 1999 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 1999).

    Science.gov (United States)

    McCoy, Leah P., Ed.

    This publication presents a collection of research projects presented at the Annual Research Forum at Wake Forest University: "The Use of Group Work as an Effective Teaching Technique in Lower Level Spanish Classes" (James Blackburn); "What Are the Real Factors behind Student Motivation?" (Matthew Grey Burdick); "Can…

  8. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  9. NREL Solar Radiation Resource Assessment Project: Status and outlook

    Science.gov (United States)

    Renne, D.; Riordan, C.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.

    1992-05-01

    This report summarizes the activities and accomplishments of NREL's Solar Radiation Resource Assessment Project during fiscal year 1991. Currently, the primary focus of the SRRAP is to produce a 1961 - 1990 National Solar Radiation Data Base, providing hourly values of global horizontal, diffuse, and direct normal solar radiation at approximately 250 sites around the United States. Because these solar radiation quantities were measured intermittently at only about 50 of these sites, models were developed and applied to the majority of the stations to provide estimates of these parameters. Although approximately 93 percent of the data base consists of modeled data this represents a significant improvement over the SOLMET/ERSATZ 1952 - 1975 data base. The magnitude and importance of this activity are such that the majority of SRRAP human and financial resources were devoted to the data base development. However, in FY 1991 the SRRAP was involved in many other activities, which are reported here. These include the continued maintenance of a solar radiation monitoring network in the southeast United States at six Historically Black Colleges and Universities (HBCU's), the transfer of solar radiation resource assessment technology through a variety of activities, participation in international programs, and the maintenance and operation of NREL's Solar Radiation Research Laboratory.

  10. Interim status report of the TMI personnel-dosimetry project

    International Nuclear Information System (INIS)

    Rich, B.L.; Alvarez, J.L.; Adams, S.R.

    1981-06-01

    The current 2-chip TLD personnel dosimeter in use at Three Mile Island (TMI) has been shown inadequate for the anticipated high beta/gamma fields during TMI recovery operations in some areas. This project surveyed the available dosimeter systems, set up an Idaho National Engineering Laboratory (INEL) prototype system, and compared this system with those commercial systems that could be made immediately available for comparison. Of the systems tested, the new INEL personnel dosimeter was found to produce the most accurate results for use in recovery operations at TMI-2. The other multiple-chip or multiple-filter systems were found less desirable at present. The most prominent deficiencies in the INEL dosimeter stem from the fact that it lacks a completely automated reader and its x-ray and thermal neutron responses require additional development. A automated prototype reader system may be in operation by the end of CY-1981. Three alternatives for operational dosimetry are discussed. A combination of a modified version of the presently used Harshaw 2-chip dosimeter and the INEL dosimeter is recommended

  11. Current status and prospects on Rokkasho nuclear fuel cycle project

    International Nuclear Information System (INIS)

    Suzuki, Mitsuo

    2003-01-01

    JNFL has been established aiming at fulfillment of Nuclear Fuel Cycle, as well as to contribute to the long-term and stable supply of nuclear power in Japan. 'Uranium Enrichment Plant' with its production of 1,050 SWU/y and planned to be expand to 1,500 SWU/y, 'Low Level Radioactive Waste Disposal Center' with 150,000/200 l drums stored, out of its 400,000 drums capacity, and 'Vitrified Waste Storage Center' with 760 canisters stored, out of its 1440 canisters capacity, are already in its operation. It is now preparing for the operation of '800 t/y Reprocessing Plant' and construction of '130t HM/y MOX Fuel Fabrication Plant'. As for the Reprocessing Plant, 780t of spent fuels has been already received and stored in the storage pools. Main plant is now in the course of test operation and planned to start the commercial operation by July 2006. Due to some defects found during the course of its construction, JNFL is now reviewing the Total Quality Assurance Structure to improve and reinforce its system. And for the MOX Fuel Fabrication Plant, activities towards obtaining the local autonomy's agreement for the construction are being made energetically. It is essential to obtain the good understanding of the public community to promote these projects successfully; JNFL is putting its best efforts to dispatch all the necessary information to the public in a timely manner. (author)

  12. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    LENUS (Irish Health Repository)

    Moorhead, Anne

    2011-03-31

    Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices\\/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups\\' ability to identify body weight status in both adults and children. The health professional groups are: (a) community related public health nurses; (b) school public health nurses; (c) GPs and practice nurses (primary care); and (d) occupational health nurses (workplace) from both Northern Ireland and the Republic of Ireland. Methods\\/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based) - to determine the attitudes, current practices\\/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals\\' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices\\/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  13. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    Directory of Open Access Journals (Sweden)

    Murphy Kathy

    2011-03-01

    Full Text Available Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups' ability to identify body weight status in both adults and children. The health professional groups are: (a community related public health nurses; (b school public health nurses; (c GPs and practice nurses (primary care; and (d occupational health nurses (workplace from both Northern Ireland and the Republic of Ireland. Methods/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based - to determine the attitudes, current practices/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  14. LNG - Status in Denmark. Technology and potential. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, M.

    2012-05-15

    The interest for LNG both on a small and a large scale is increasing worldwide. The experiences and knowledge on LNG is limited in Denmark. The Danish gas companies' Technical Management Group (TCG) has asked for a status report including a technology description and an evaluation of the potential in Denmark. A survey of primarily small-scale LNG technology is done in the report. The focus is motivated by the new areas of gas utilisation that become possible with small-scale LNG. Small-scale LNG in this study is defined as LNG stored and used at the application or in an isolated gas grid. The small-scale use of LNG has today an almost negligible share of the total LNG trade but offers interesting new applications for gas utilisation. LNG on a small scale can be used primarily as: 1) Ship fuel. 2) Truck fuel (heavy duty long distance). 3) Individual users not connected to the natural gas grid. 4) Backup for upgraded biogas to individual users and vehicle fleets. 5) Security of supply or supply enhancement of heavily loaded parts of the gas grid. 6) Small-scale storage and/or peak shaving. All but the first topics are natural uses for the current Danish gas distributors. LNG as ship fuel may engage other specialized LNG companies. The report contains a technical description of the parts in primarily small-scale LNG handling and operation. Liquefaction, transport, storage, engine technologies, gas quality and safety aspects related to LNG are covered. There seem to be two more or less separate paths for LNG in Denmark, onshore and off-shore use. These are not, apparently, sharing their experiences and knowledge. Rules and regulations are also different which may create some problems in the interface, for example ship bunkering. Further studies are suggested in the area of gas quality and engine technologies and adaptation of foreign guidelines for small-scale installations to Danish conditions. These guidelines ought to be based on international standards and

  15. The Earthquake Source Inversion Validation (SIV) - Project: Summary, Status, Outlook

    Science.gov (United States)

    Mai, P. M.

    2017-12-01

    Finite-fault earthquake source inversions infer the (time-dependent) displacement on the rupture surface from geophysical data. The resulting earthquake source models document the complexity of the rupture process. However, this kinematic source inversion is ill-posed and returns non-unique solutions, as seen for instance in multiple source models for the same earthquake, obtained by different research teams, that often exhibit remarkable dissimilarities. To address the uncertainties in earthquake-source inversions and to understand strengths and weaknesses of various methods, the Source Inversion Validation (SIV) project developed a set of forward-modeling exercises and inversion benchmarks. Several research teams then use these validation exercises to test their codes and methods, but also to develop and benchmark new approaches. In this presentation I will summarize the SIV strategy, the existing benchmark exercises and corresponding results. Using various waveform-misfit criteria and newly developed statistical comparison tools to quantify source-model (dis)similarities, the SIV platforms is able to rank solutions and identify particularly promising source inversion approaches. Existing SIV exercises (with related data and descriptions) and all computational tools remain available via the open online collaboration platform; additional exercises and benchmark tests will be uploaded once they are fully developed. I encourage source modelers to use the SIV benchmarks for developing and testing new methods. The SIV efforts have already led to several promising new techniques for tackling the earthquake-source imaging problem. I expect that future SIV benchmarks will provide further innovations and insights into earthquake source kinematics that will ultimately help to better understand the dynamics of the rupture process.

  16. Canadian pediatric gastroenterology workforce: Current status, concerns and future projections

    Science.gov (United States)

    Morinville, Véronique; Drouin, Éric; Lévesque, Dominique; Espinosa, Victor M; Jacobson, Kevan

    2007-01-01

    BACKGROUND: There is concern that the Canadian pediatric gastroenterology workforce is inadequate to meet health care demands of the pediatric population. The Canadian Association of Gastroenterology Pediatric Committee performed a survey to determine characteristics and future plans of the Canadian pediatric gastroenterology workforce and trainees. METHODS: Estimates of total and pediatric populations were obtained from the 2001 Census of Population, Statistics Canada (with estimates to July 1, 2005). Data on Canadian pediatric gastroenterologists, including clinical full-time equivalents, sex, work interests, opinions on workforce adequacy, retirement plans, fellowship training programs and future employment plans of fellows, were gathered through e-mail surveys and telephone correspondence in 2005 and 2006. RESULTS: Canada had an estimated population of 32,270,507 in 2005 (6,967,853 people aged zero to 17 years). The pediatric gastroenterology workforce was estimated at 9.2 specialists per million children. Women accounted for 50% of the workforce. Physician to pediatric population ratios varied, with Alberta demonstrating the highest and Saskatchewan the lowest ratios (1:69,404 versus 1:240,950, respectively). Between 1998 and 2005, Canadian pediatric gastroenterology fellowship programs trained 65 fellows (65% international trainees). Twenty-two fellows (34%) entered the Canadian workforce. CONCLUSIONS: The survey highlights the variable and overall low numbers of pediatric gastroenterologists across Canada, an increasingly female workforce, a greater percentage of part-time physicians and a small cohort of Canadian trainees. In conjunction with high projected retirement rates, greater demands on the work-force and desires to partake in nonclinical activities, there is concern for an increasing shortage of pediatric gastroenterologists in Canada in future years. PMID:17948136

  17. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    International Nuclear Information System (INIS)

    Maguire, J.F.; Yuan, J.

    2009-01-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  18. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, J.F., E-mail: jmaguire@amsc.co [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States); Yuan, J. [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States)

    2009-10-15

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  19. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Science.gov (United States)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  20. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  1. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  2. Status of the Korean nuclear hydrogen production project

    International Nuclear Information System (INIS)

    Jonghwa, Chang; Won-Jae, Lee

    2010-01-01

    development on an enlarged scale in correspondence with the Generation IV International Forum. The second phase of the key technology development will greatly reduce the technical and economical risk in the nuclear hydrogen project. The government is also considering the construction of the NHDD plant and will start funding for a conceptual design from 2010. (authors)

  3. Annual report of the Tandem Accelerator Center, Nuclear and Solid State Research Project, University of Tsukuba

    International Nuclear Information System (INIS)

    1980-01-01

    This is the fifth annual report of the Tandem Accelerator Center, as well as the third of the Nuclear and Solid State Research Project at the University of Tsukuba. It contains the short descriptions of the activities during the period from April, 1979, to March, 1980. The 12 UD Pelletron has worked well and was utilized over 2900 hours as the time of beam on targets. The performance of the polarized ion source has been quite good, and it produced the beams of polarized protons and deuterons as well as of alpha particles. The sputter ion source (TUNIS) replaced the direct extraction duoplasmatron in most cases, and it produced the beams of isotopes of O, F, Si, Cl, Ni, Cu, etc., without gas injection. The construction of the second measuring room has been completed, and four beam courses are equipped with a general purpose scattering chamber, the devices for perturbed angular correlation, inner and outer shell ionization, and biological studies. The beam pulsing system was installed on the accelerator, and will be in operation soon. Further efforts have been made to develop detection and data processing systems. The examples of the recent researches mainly under the program of the NSSRP in various fields are enumerated. The exchange and collaboration with other institutions were active. (Kako, I.)

  4. Annual report on reactor safety research projects sponsored by the Minister for Research and Technology of the Federal Republic of Germany 1989

    International Nuclear Information System (INIS)

    1990-08-01

    Investigations on the safety of light water reactors (LWR) being performed in the framework of his research program on reactor safety are sponsored by the Bundesminister fuer Forschung und Technologie (BMFT) (Federal Minister for Research and Technology). Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks also projects on the safety of advanced reactors are sponsored by the BMFT. The Gesellschaft fuer Reaktorsicherheit (GRS), (Society for Reactor Safety), by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the Forschungsbetreuung at the GRS, (FB) (Research Coordination Department), within the framework of general informations of progress in reactor safety research. The individual reports are classified according to the same classification system as applied in the nuclear index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in sequence of their project numbers. (orig./HP)

  5. SiC/SiC fuel cladding R and D Project 'SCARLET': Status and future plan

    International Nuclear Information System (INIS)

    Kishimoto, Hirotatsu; Kohyama, Akira

    2015-01-01

    This paper provides the recent progress in SiC/SiC development towards early utilisation for LWRs based on NITE method. After the March 11 Disaster in East-Japan, ensuring safe technology for LWR became a top priority R and D in nuclear energy policy of Japan. Along this line, replacement of Zircaloy claddings with SiC/SiC based fuel cladding is becoming one of the most attractive options and a MEXT fund based project, SCARLET, and a METI fund based project have been launched as 5-year termed projects at Muroran Institute of Technology. These projects care for NITE process for making long SiC/SiC fuel pins and connecting technology integration. The SCARLET project also includes coolant compatibility and irradiation effect evaluations as LWR and LMFBR materials. The outline and the present status of the SCARLET project will be briefly introduced in the present paper. (authors)

  6. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project's (YMP's) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis

  7. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  8. Los Alamos National Laboratory Yucca Mountain Site Characterization Project: 1991 quality program status report

    International Nuclear Information System (INIS)

    1992-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project's (YMP) quality assurance program for calendar year 1991. The report is divided into three Sections: Program Activities, Verification Activities, and Trend Analysis

  9. Status of parasitism in donkeys of project and control areas in ...

    African Journals Online (AJOL)

    The study was undertaken with the aim of comparing the status of parasitism in donkeys in the Donkey Health and welfare Project intervention (Bereh, Ada and Boset) and Control (Yekaduda, Gerado and Meki) areas of, Central Ethiopia, in 2005. Parasites are prime problem of donkeys among other problems including ...

  10. Yucca Mountain Project technical status report (TSR), October 1989--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This Yucca Mountain Project Technical Status Report (TSR) on site characterization is the second in a series of reports that will be issued at approximately six-month intervals during site characterization. In addition, progress made toward the initiation and conduct of new site characterization activities is included. For this report, information on the technical progress made by Yucca Mountain Project participating organizations has been compiled covering the period from October 1989, through March 31, 1990. The status report consists of three sections: an introductory section; a section on the status of site characterization, which includes preparatory activities, sites programs, repository design, seals system design, waste package design, and performance assessment; and a reference section, which provides a complete listing of all published documents cited in the text. 59 refs

  11. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 2007. Progress report

    International Nuclear Information System (INIS)

    2007-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Research Management Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system 'Joint Safety Research Index (JSRI)'. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  12. Kelt reconditioning : A research project to enhance iteroparity in Columbia Basin steelhead (Oncorhynchus mykiss) : Annual report 2000; ANNUAL

    International Nuclear Information System (INIS)

    Evans, Allen F.

    2001-01-01

    Repeat spawning is a life history strategy that is expressed by some species from the family salmonidae. Natural rates of repeat spawning for Columbia River steelhead Oncorhynchus mykiss populations range from 1.6 to 17%. Increasing this repeat spawning rate using fish culture techniques could assist the recovery of depressed steelhead populations. Reconditioning is the process of culturing post-spawned fish (kelts) in a captive environment until they are able to grow and develop mature gonads. Kelt reconditioning techniques were initially developed for Atlantic salmon Salmo salar and sea-trout S. trutta. The recent Endangered Species Act listing of many Columbia Basin steelhead populations has prompted interest in developing reconditioning methods for local populations. The primary purpose of this project in 2000 was to test the general feasibility of collecting, feeding, and treating steelhead kelts in a captive environment. Steelhead kelts were collected from the Yakima River at the Chandler Juvenile Evaluation Facility (Rkm 48) from 12 March to 13 June 2000. Kelts were reconditioned at adjacent Prosser Hatchery in both rectangular and circular tanks and fed a mixed diet of starter paste, adult sized trout pellets, and freeze-dried krill. Formalin was used to control outbreaks of fungus, and we tested the use of ivermectin to control internal parasites (e.g., Salmincola spp.). Some the kelts that died during the reconditioning process were analyzed via pathology and gonad histology to ascertain the possible cause of death and to describe their reproductive development at the time of death. All surviving specimens were released for natural spawning on 12 December 2000. Overall success of the reconditioning process was based on the proportion of fish that survived captivity, gained weight, and on the number of fish that successfully underwent gonadal recrudescence. Many of the reconditioned kelts were radio tagged to assess their spawning migration behavior and

  13. Socioeconomic Status As a Risk Factor for Unintended Pregnancy in the Contraceptive CHOICE Project.

    Science.gov (United States)

    Iseyemi, Abigail; Zhao, Qiuhong; McNicholas, Colleen; Peipert, Jeffrey F

    2017-09-01

    To evaluate the association of low socioeconomic status as an independent risk factor for unintended pregnancy. We performed a secondary analysis of data from the Contraceptive CHOICE project. Between 2007 and 2011, 9,256 participants were recruited and followed for up to 3 years. The primary outcome of interest was unintended pregnancy; the primary exposure variable was low socioeconomic status, defined as self-report of either receiving public assistance or having difficulty paying for basic necessities. Four contraceptive groups were evaluated: 1) long-acting reversible contraceptive method (hormonal or copper intrauterine device or subdermal implant); 2) depot medroxyprogesterone acetate injection; 3) oral contraceptive pills, a transdermal patch, or a vaginal ring; or 4) other or no method. Confounders were adjusted for in the multivariable Cox proportional hazard model to estimate the effect of socioeconomic status on risk of unintended pregnancy. Participants with low socioeconomic status experienced 515 unintended pregnancies during 14,001 women-years of follow-up (3.68/100 women-years; 95% CI 3.37-4.01) compared with 200 unintended pregnancies during 10,296 women-years (1.94/100 women-years; 95% CI 1.68-2.23) among participants without low socioeconomic status. Women with low socioeconomic status were more likely to have an unintended pregnancy (unadjusted hazard ratio [HR] 1.8, 95% CI 1.5-2.2). After adjusting for age, education level, insurance status, and history of unintended pregnancy, low socioeconomic status was associated with an increased risk of unintended pregnancy (adjusted HR 1.4, 95% CI 1.1-1.7). Despite the removal of cost barriers, low socioeconomic status is associated with a higher incidence of unintended pregnancy.

  14. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  15. Status of Radon Related Activities in Member States Participating in Technical Cooperation Projects in Europe

    International Nuclear Information System (INIS)

    2017-03-01

    This publication summarizes the status of radon programmes at the start of 2014 in the Member States in Europe participating in the IAEA technical cooperation project on establishing enhanced approaches to the control of public exposure to radon. The current status was determined from responses to a questionnaire covering the following elements of a national radon action plan: policies and strategies; radon measurement surveys; establishment of reference levels; managing radon in existing buildings and in future buildings; education and training of professionals; and public awareness initiatives.

  16. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  17. Anthropogenic SO2/NOx committee summary of current status--annual inventory

    International Nuclear Information System (INIS)

    Benkovitz, C.M.

    1992-06-01

    At the First GEIA Workshop on Global Emissions Inventories, held in Baltimore, MD on December 1--2, 1991, data on anthropogenic emissions of sulfur and nitrogen developed by Dignon (1992) were selected to form the basis for the GEIA SO 2 and NO x annual inventories. The Dignon data include emissions from fuel combustion only and currently extend to 1980. The methodology used was detailed in Dignon and Hameed (1985) and consists of statistical regression models based on available emissions data from the U.S and some other member countries of the Organization of Economic Cooperation and Development (OECD), which includes Australia, Canada, Japan and western European countries. Control regulations are incorporated via the use of different statistical parameter The grid definition from these inventories was also adopted for the GEIA grid: origin at 180 degree W, 90 degree S, 1 degree x 1 degree resolution (i.e., 360 cells in the longitude direction, 180 cells in the latitude direction). To upgrade the basic GEIA inventories, data for the different geographic regions being solicited from researchers located within these areas. This paper contains the upgrades which have been accomplished to date

  18. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  19. Status of safety in nuclear facilities - 2012. AREVA General Inspectorate Annual report

    International Nuclear Information System (INIS)

    2013-05-01

    After a message from the Areva's Chief Executive Officer and a message from the senior Vice President of safety, health, security, sustainable development, a text by the inspector general comments the key safety results (events, dose levels, radiological impacts), the inspection findings, the areas of vigilance (relationship with the ASN, the management of the criticality risk, and facility compliance), some significant topics after the Fukushima accident. Then this report addresses the status of nuclear safety and radiation protection in the group's facilities and operations. It more specifically addresses the context and findings (lessons learned from the inspections, operating experience from event, employee radiation monitoring, environmental monitoring), crosscutting processes (safety management, controlling facility compliance, subcontractor guidance and management, crisis management), specific risks (criticality risk, fire hazards, transportation safety, radioactive waste management, pollution prevention, liability mitigation and dismantling), and areas for improvement and outlook

  20. Annual report on reactor safety research projects sponsored by the Ministry for Research and Technology of the Federal Republic of Germany 1987

    International Nuclear Information System (INIS)

    1988-06-01

    The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress-Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of progress in reactor safety research. The individual reports are classified according to the Research Program on the Safety of LWRs of the BMFT. Another table of contents uses the same classification system as applied in the Nuclear Safety Index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The report are arranged in the sequence of their project numbers. (orig./HP) [de

  1. Annual report on reactor safety research projects sponsored by the Ministry for Research and Technology of the Federal Republic of Germany 1988

    International Nuclear Information System (INIS)

    1989-06-01

    The GRS (Society for Reactor Safety), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the FB (Research Coordination Department) Forschungsbetreuung at the GRS, within the framework of general information of progress in the reactor safety research. The individual reports are classified according to the same classification system as applied in the nuclear index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in sequence of their project numbers. Besides the progress reports, lists of reports exchanged under international exchange agreements by the BMFT are published within this series. (orig./HP)

  2. Annual report on Reactor Safety Research Projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 1999. Progress report

    International Nuclear Information System (INIS)

    2000-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technologie (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to the classification system ''Joint Safety Research Index'' of the CEC (commission of the European communities). The reports are arranged in sequence of their project numbers. (orig.)

  3. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Labour of the Federal Republic of Germany. Reporting period 2003. Progress report

    International Nuclear Information System (INIS)

    2003-01-01

    The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of the investigations into the safety of nuclear power plants by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system ''Joint Safety Research Index'' of the CEC (commission of the european communities). The reports are arranged in sequence of their project numbers

  4. Investigations of migratory birds during operation of Horns Rev offshore wind farm. Annual status report 2004

    Energy Technology Data Exchange (ETDEWEB)

    Kjaer Christensen, T.; Hounisen, J.P. [NERI, Dept. of Wildlife Ecology and Biodiversity, Roskilde (Denmark)

    2005-07-01

    The aim of the project is to assess the collision risk between birds and wind turbines at the Horns Rev wind farm. The study focused on describing bird movements in relation to the wind farm and to identify the species-specific behavioural responses towards the wind turbines shown by migrating and staging bird species. The study was based on data from spring 2004. The Horns Rev area lies in a region known to be of importance for substantial water bird migration as well as holding internationally important numbers of several wintering and staging water bird species. (au)

  5. Investigations of migratory birds during operation of Horns Rev offshore wind farm. Annual status report 2004

    International Nuclear Information System (INIS)

    Kjaer Christensen, T.; Hounisen, J.P.

    2005-01-01

    The aim of the project is to assess the collision risk between birds and wind turbines at the Horns Rev wind farm. The study focused on describing bird movements in relation to the wind farm and to identify the species-specific behavioural responses towards the wind turbines shown by migrating and staging bird species. The study was based on data from spring 2004. The Horns Rev area lies in a region known to be of importance for substantial water bird migration as well as holding internationally important numbers of several wintering and staging water bird species. (au)

  6. Potentiometric-level monitoring program, Mississippi and Louisiana: Annual status report for fiscal year 1985

    International Nuclear Information System (INIS)

    1986-10-01

    Potentiometric-level data presented in this report were collected at 82 wells in Mississippi and Louisiana from October 1984 through September 1985. These wells are located near Richton and Cypress Creek Domes in Mississippi and Vacherie dome in Louisiana. Three wells were reinstated to the program during this period. Two previously destroyed wells were deleted from the program. Protective barriers were installed around 26 shallow borings in Mississippi. Cursory analysis of the data in Mississippi indicated minimal, if any, change in potentiometric level during the past year in the Citronelle, Hattiesburg, Cockfield, Sparta, and Wilcox Formations. A slight decline, on the order of 0.3 meter (1 foot), occurred during the past year in well MCCG-1, which is screened in the caprock of Cypress Creek Dome. The potentiometric level in well MRIG-9, in the caprock of Richton Dome, stabilized during fiscal year 1985 following 5 years of increase. The Catahoula Formation experienced a continuing decline of about 0.3 meter/year (1 foot/year). Well MH-5C, screened in the Cook Mountain Formation, showed a continuing, long-term, upward trend on the order of 1.5 meters (4.9 feet) during the past year. The potentiometric level of well MH-8C, screened in the Cook Mountain Formation, stabilized during fiscal year 1985, following 5 years of large annual increases. Wells screened in the Austin Formation in Louisiana showed a downward trend of 0.3 to 1 meter (1 to 3.3 feet) during fiscal year 1985. Other formations in Louisiana generally showed no change in potentiometric level

  7. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  8. Status of spallation neutron source program in High Intensity Proton Accelerator Project

    International Nuclear Information System (INIS)

    Oyama, Yukio

    2001-01-01

    Japan Atomic Energy Research Institute and High Energy Accelerator Organization are jointly designing a 1 MW spallation neutron source as one of the research facilities planned in the High Intensity Proton Accelerator Project. The spallation neutron source is driven by 3 GeV proton beam with a mercury target and liquid hydrogen moderators. The present status of design for these spallation source and relevant facility is overviewed. (author)

  9. Evaluate Status of Pacific Lamprey in the Clearwater River Drainage, Idaho, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Cochnauer, Tim; Claire, Christopher

    2003-10-01

    In 2002 Idaho Department of Fish and Game continued investigation into the status of Pacific lamprey populations in Idaho's Clearwater River drainage. Trapping, electrofishing, and spawning ground redd surveys were used to determine Pacific lamprey distribution, life history strategies, and habitat requirements in the South Fork Clearwater River, Lochsa River, Selway River, and Middle Fork Clearwater River subbasins. Five-hundred forty-one ammocoetes were captured electroshocking 70 sites in the South Fork Clearwater River, Lochsa River, Selway River, Middle Fork Clearwater River, Clearwater River, and their tributaries in 2002. Habitat utilization surveys in Red River support previous work indicating Pacific lamprey ammocoete densities are greater in lateral scour pool habitats compared to riffles and rapids. Presence-absence survey findings in 2002 augmented 2000 and 2001 indicating Pacific lamprey macrothalmia and ammocoetes are not numerous or widely distributed. Pacific lamprey distribution was confined to the lower reaches of Red River below rkm 8.0, the South Fork Clearwater River, Lochsa River (Ginger Creek to mouth), Selway River (Race Creek to mouth), Middle Fork Clearwater River, and the Clearwater River (downstream to Potlatch River).

  10. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N.A. [comp.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.

  11. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    International Nuclear Information System (INIS)

    Rink, N.A.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997

  12. Lake Roosevelt Fisheries Evaluation Program, Part A; Fisheries Creel Survey and Population Status Analysis, 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Spotts, Jim; Shields, John; Underwood, Keith

    2002-05-01

    The Lake Roosevelt Fisheries Evaluation Program is the result of a merger between two projects, the Lake Roosevelt Monitoring Program (BPA No. 8806300) and the Lake Roosevelt Data Collection Project (BPA No. 9404300). These projects were merged in 1996 to continue work historically completed under the separate projects, and is now referred to as the Lake Roosevelt Fisheries Evaluation Program. Creel and angler surveys estimated that anglers made 196,775 trips to Lake Roosevelt during 1998, with an economic value of $8.0 million dollars, based on the Consumer Price Index (CPI). In 1998 it was estimated that 9,980 kokanee salmon, 226,809 rainbow trout, 119,346 walleye, and over 14,000 smallmouth bass and other species were harvested. Creel data indicates that hatchery reared rainbow trout contribute substantially to the Lake Roosevelt fishery. The contribution of kokanee salmon to the creel has not met the expectations of fishery managers to date, and is limited by entrainment from the reservoir, predation, and possible fish culture obstacles. The 1998 Lake Roosevelt Fisheries Creel and Population Analysis Annual Report includes analyses of the relative abundance of fish species, and reservoir habitat relationships (1990-1998). Fisheries surveys (1990-1998) indicate that walleye and burbot populations appear to be increasing, while yellow perch, a preferred walleye prey species, and other prey species are decreasing in abundance. The long term decreasing abundance of yellow perch and other prey species are suspected to be the result of the lack of suitable multiple reservoir elevation spawning and rearing refugia for spring spawning reservoir prey species, resulting from seasonal spring-early summer reservoir elevation manipulations, and walleye predation. Reservoir water management is both directly, and indirectly influencing the success of mitigation hatchery production of kokanee salmon and rainbow trout. Tag return data suggested excessive entrainment occurred in

  13. Waste tank safety program annual status report for FY 1993, Task 5: Toxicology and epidemiology

    International Nuclear Information System (INIS)

    Mahlum, D.D.; Young, J.Y.

    1993-09-01

    A toxicology team independently reviewed analytical data and provided advice concerning potential health effects associated with exposure to tank-vapor constituents at the Hanford site. Most of the emphasis was directed toward Tank 241-C-103, but a preliminary assessment was also made of the toxicologic implication of the cyanide levels in the headspace of Tank 241-C-108. The objectives of this program are to (1) review procedures used for sampling vapors from various tanks, (2) identify constituents in tank-vapor samples that could be related to symptoms reported by waste-tank workers, (3) evaluate the toxicologic implications of those constituents by comparison to established toxicologic data bases, (4) provide advice for additional analytical efforts, and (5) support other activities as requested by the project manager and the cognizant Westinghouse Hanford Company Tank Vapor Issues Safety Resolution Manager

  14. CURRENT STATUS OF RESEARCH PROJECT ACTIVITIES IN MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: In Bulgaria there are five medical universities: in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. Their main mission is training specialists in the fields of medicine and health care, increasing their qualification by means of postgraduate education and performing research activities. One of medical universities’ top priorities is encouraging research activities mainly aimed at preparation and implementation of research projects. Aim: The purpose of our study is to examine the current status of research project activities in Bulgarian medical universities.Material and methods: In order to define the science competitions related to Bulgarian medical universities we have applied a documentary and sociological approach. Results: Research projects that Bulgarian medical universities can apply for are divided into two groups – national and international. The most significant international projects are European ones since Bulgaria is an EU member state and this allows us to participate in such projects. Conclusion: Universities should strive for establishing even better conditions for encouraging application for research projects aimed at developing competent and experienced staff, even though the majority of them may not obtain approval for financing.The changes in the situation regarding Bulgarian science require the implementation and development of more research staff motivated to improve their knowledge and skills in the relevant dynamically changing competition and project field.

  15. Discovery of endangered annual killifish Austrolebias cheradophilus (Aplocheiloidei: Rivulidae in Brazil, with comments on habitat, population structure and conservation status

    Directory of Open Access Journals (Sweden)

    Luis Esteban Krause Lanés

    Full Text Available Austrolebias genus comprises about 40 small annual killifishes endemic to South America and their highest diversity occurs in southern Brazil and Uruguay, especially in drainages of Patos-Mirim system. Austrolebiasspecies are severely threatened with extinction because their life cycle and restricted ranges. Low dispersal ability and the extensive loss and fragmentation of freshwater wetlands contribute to this threat. Accurate information on the geographic distribution and ecology of the species, vital to plan conservation and management strategies, are scarce. In order to provide basic knowledge for annual fish conservation this paper reports the presence of Austrolebias cheradophilus and present data about its population structure (CPUA, size, sex ratio, length-weight relationships and condition factor and conservation status in southern Brazil. The estimated CPUA of populations was 0.86 fish/m2. Standard length (SL of males ranged between 32.14 and 49.17 mm and for females between 25.11 and 41.6 mm. There were no differences in SL between the sexes (t-test = - 1.678; P = 0.105, and Chi-squared test demonstrated marginal differences in proportions of sexes (2.25:1; χ2 = 3.846; P= 0.07. Allometric coefficient of the LWR was slightly hyperallometric (b = 3.08 and K of the specimens ranged from 1.84 to 2.42 (mean ± S.E. = 2.12 ± 0.04. Populations have low density and their biotopes are under critical threat, mainly due to suppression by agriculture, pastures for livestock and increase housing. The species is considered "Critically Endangered" in Brazil, furthermore is strongly recommended its inclusion on lists of endangered fauna and ensures the protection of their remaining habitats.

  16. Projecting pest population dynamics under global warming: the combined effect of inter- and intra-annual variations.

    Science.gov (United States)

    Zidon, Royi; Tsueda, Hirotsugu; Morin, Efrat; Morin, Shai

    2016-06-01

    The typical short generation length of insects makes their population dynamics highly sensitive not only to mean annual temperatures but also to their intra-annual variations. To consider the combined effect of both thermal factors under global warming, we propose a modeling framework that links general circulation models (GCMs) with a stochastic weather generator and population dynamics models to predict species population responses to inter- and intra-annual temperature changes. This framework was utilized to explore future changes in populations of Bemisia tabaci, an invasive insect pest-species that affects multiple agricultural systems in the Mediterranean region. We considered three locations representing different pest status and climatic conditions: Montpellier (France), Seville (Spain), and Beit-Jamal (Israel). We produced ensembles of local daily temperature realizations representing current and future (mid-21st century) climatic conditions under two emission scenarios for the three locations. Our simulations predicted a significant increase in the average number of annual generations and in population size, and a significant lengthening of the growing season in all three locations. A negative effect was found only in Seville for the summer season, where future temperatures lead to a reduction in population size. High variability in population size was observed between years with similar annual mean temperatures, suggesting a strong effect of intra-annual temperature variation. Critical periods were from late spring to late summer in Montpellier and from late winter to early summer in Seville and Beit-Jamal. Although our analysis suggested that earlier seasonal activity does not necessarily lead to increased populations load unless an additional generation is produced, it is highly likely that the insect will become a significant pest of open-fields at Mediterranean latitudes above 40° during the next 50 years. Our simulations also implied that current

  17. Annual report 2003-2004

    International Nuclear Information System (INIS)

    2004-01-01

    The annual report for the year 2003-2004 has been compiled, which offers concise description of tasks achieved and status of on going efforts pertaining to PAEC (Pakistan Atomic Commission) programme. The tasks description are as: highlights of various projects, nuclear power plants, physical sciences and engineering, biosciences, nuclear minerals, human resource development, projects, international relations. At the end of this report financial position of PAEC and list of publication list is also available. (A.B.)

  18. Annual Report 2000-2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The annual report for the year 2000-2001 has been compiled, which offers concise description of tasks achieved and status of on going efforts pertaining to PAEC (Pakistan Atomic Commission) programme. The tasks description are as: highlights of various projects, nuclear power plants, physical sciences and engineering, biosciences, nuclear minerals, human resource development, projects, international relations. At the end of this report financial position of PAEC and list of publication is also available. (A.B.)

  19. Annual Report 2000-2001

    International Nuclear Information System (INIS)

    2002-01-01

    The annual report for the year 2000-2001 has been compiled, which offers concise description of tasks achieved and status of on going efforts pertaining to PAEC (Pakistan Atomic Commission) programme. The tasks description are as: highlights of various projects, nuclear power plants, physical sciences and engineering, biosciences, nuclear minerals, human resource development, projects, international relations. At the end of this report financial position of PAEC and list of publication is also available. (A.B.)

  20. AREVA General Inspectorate 2010 Annual Report. Status of safety in nuclear facilities

    International Nuclear Information System (INIS)

    2010-01-01

    After messages by different managers, this report proposes a description of the context for nuclear safety: group's policy in matters of nuclear safety and radiation protection, regulatory changes (in France, with respect to information, changes in administrative organization, overhaul of general technical regulations, international context). It describes the organizational changes which occurred within the company. It reports actions regarding transparency, briefly describes actions and principles aimed at improving safety, indicates and comments noteworthy nuclear events, discusses their assessment from a HOF (human and organizational factors) perspective, comments lessons learned from inspections, comments data regarding radiation protection and actions aimed at improving radiation protection. It discusses environmental impact issues. It addresses the different processes and factors which transversely appear in nuclear safety: safety management, human and organizational factors, safety in design, project management, and emergency management. Several specific risks are discussed: criticality control, nuclear materials safeguards, fire, spill prevention, transportation, radioactive waste, shutdown and dismantling, service operations, mining, and environmental liabilities. Document in French and in English

  1. Near-dome geologic findings - Richton Dome, Mississippi: annual status report for FY 83

    International Nuclear Information System (INIS)

    1984-10-01

    Basin Analysis is a study of the regional and local stratigraphic, tectonic, and salt-tectonic conditions that influenced the development of the Mississippi Salt Basin and Richton Dome, an element within that basin. During FY 83, work was concentrated on the local area surrounding Richton Dome and included the writing of the Midyear FY 83 Richton Dome Screening and Suitability Review, input to the Site Characterization Plan that is being prepared by the Southern Region Geologic Project Manager, and initial development of a near-dome geologic model. The geologic model was compiled using information from approximately 300 oil and gas well geophysical logs and 128 line km (80 line mi) of seismic-reflection profiles. In addition to analysis and interpretation of the logs and profiles, stratigraphic data from each were assembled in a computer-based file and were used to produce computer-generated structural contour maps. Major findings from the analyses include a new configuration for the northern end of Richton Dome and improved definitions of near-dome faults and the rim syncline on the northern and eastern flanks of Richton Dome. 4 references, 6 figures

  2. [Shippingport Station Decommissioning Project]: FY 1987 annual progress report, October 1, 1986-September 30, 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1987. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 3 refs., 9 figs., 4 tabs

  3. Shippingport Station Decommissioning Project: FY 1986 annual progress report, October 1, 1985 through September 30, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1986. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedule considerations. 9 refs., 4 figs., 3 tabs

  4. Shippingport Station Decommissioning Project: FY 1988 annual progress report, October 1, 1987--September 30, 1988

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents progress on the Shippingport Station Decommissioning Project for FY 1988. There are two main topics: Project Management and Decommissioning Project Activities. Changes from technical and managerial concepts developed in the original Decommissioning Plan are presented with the related technical, economic, or schedular considerations. 4 refs., 17 figs., 2 tabs

  5. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    International Nuclear Information System (INIS)

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology

  6. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  7. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  8. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  9. 14. Annual meeting of the European Society of Radiobiology and the symposium of the European Late Effects Project Group

    International Nuclear Information System (INIS)

    Charles, M.W.

    1979-03-01

    In October 1978 the Fourteenth Annual Meeting of the European Society of Radiation Biology (ESRB) and a symposium of the European Late Effects Project Group (EULEP) were held consecutively at the Kernforchungsanlage (KFA), Julich, FDR. The EULEP meeting was convened to specifically discuss the biological basis of the recommendations of publication 26 of the International Commission on Radiological Protection (ICRP). The programme of the ESRB Meeting also reflected the present interest in radiological protection. A short summary of these meetings is presented. Details of the two meetings are given in appendices which should form an introduction to, and resume of, recent developments in this field. (author)

  10. John Day River Subbasin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Delano, Kenneth H.

    2004-04-01

    Work undertaken in 2003 included: (1) Seven new fence projects were completed thereby protecting 7.6 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) Maintenance of all active project fences (66.14 miles), watergaps (66), spring developments (33) and plantings were checked and repairs performed. (4) Since the initiation of the Fish Habitat Project in 1984 we have 72.94 miles of stream protected using 131.1 miles of fence. With the addition of the Restoration and Enhancement Projects we have 205.96 miles of fence protecting 130.3 miles of stream.

  11. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  12. Evaluation of nuclear facility decommissioning projects. Status report. Humboldt Bay Power Plant Unit 3, SAFSTOR decommissioning

    International Nuclear Information System (INIS)

    Baumann, B.L.; Haffner, D.R.; Miller, R.L.; Scotti, K.S.

    1986-06-01

    This document explains the purpose of the US Nuclear Regulatory Commission's (NRC) Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program and summarizes information concerning the decommissioning of the Humboldt Bay Power Plant (HBPP) Unit 3 facility. Preparations to put this facility into a custodial safe storage (SAFSTOR) mode are currently scheduled for completion by June 30, 1986. This report gives the status of activities as of June 1985. A final summary report will be issued after completion of this SAFSTOR decommissioning activity. Information included in this status report has been collected from the facility decommissioning plan, environmental report, and other sources made available by the licensee. This data has been placed in a computerized data base system which permits data manipulation and summarization. A description of the computer reports that can be generated by the decommissioning data system (DDS) for Humboldt Bay and samples of those reports are included in this document

  13. Decontamination and decommissioning project status of the TRIGA mark-2±3 research reactors

    International Nuclear Information System (INIS)

    Jung, K. J.; Baek, S. T.; Jung, W. S.; Park, S. K.; Jung, K. H.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO at the Korea Atomic Energy Research Institute (KAERI) in Taejeon. Decontamination and decommissioning (D and D) project of the TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. In the first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). In 1998, Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Science and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license at the end of September 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project

  14. Decontamination and decommissioning project status of the TRIGA Mark II and III in Korea

    International Nuclear Information System (INIS)

    Paik, S.T.; Park, S.K.; Chung, K.W.; Chung, U.S.; Jung, K.J.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO (High-flux Advanced Neutron Application Reactor) at the Korea Atomic Energy Institute (KAERI) in Taejon. Decontamination and decommissioning (D and D) project of TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. The first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is the technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Since and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license in mid 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project. (author)

  15. Project in use compliance air pollution by cars: annual report 1994-1995

    NARCIS (Netherlands)

    Rijkeboer, R.C.; Binkhorst, R.P.; Zuidgeest, L.W.M.; Rozendal, W.G.J.

    1996-01-01

    This report describes the results of the 8th measuring year of the "in-use compliance project" carried out by TNO at the request of the Dutch Ministry of the Environment. Purpose and implementation of the project are in general terms that in connection with compliance with (international)

  16. Nuclear fusion project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1988-07-01

    Short communications give a survey of 38 technology tasks, the development of ECRH power sources at 150 GHz, and 9 NET study are listed in the appendices I and II, respectively, while the KfK departments contributing to the Fusion Project and the Fusion Project Management Staff are listed in appendices III and IV, respectively. (GG)

  17. Uranium Mill Tailings Remedial Action Project, fiscal year 1995 annual report to stakeholders

    International Nuclear Information System (INIS)

    1995-01-01

    In 1978, Congress authorized the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping projects. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about both phases of the UMTRA Project. DOE's UMTRA Project is the world's largest materials management project ever undertaken to reduce or eliminate risk to the general public from exposure to potentially hazardous and radioactive materials. With an estimated cost at completion of nearly $2 billion for both phases of the UMTRA Project, and with the responsibility for encapsulating and isolating almost one-fourth of all the uranium mill tailings generated across the entire US (more than 44 million cubic yards), the UMTRA Project and its people have achieved a long record of safely and effectively completing its mission. It continually enhances its national reputation through its diligent process and cost efficiency as well as its international recognition for its technological innovation

  18. 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N. [comp.

    1997-03-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons production throughout the DOE complex. This document also serves as an end-for-year review of projects and positions the program for FY97.

  19. John Day River Subbasin Fish Habitat Enhancement Project, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Jerome, James P.; Delano, Kenneth H.

    2003-03-01

    Work undertaken in 2002 included: (1) Seven new fence projects were completed thereby protecting 6.0 miles of stream (2) Completion of 0.7 miles of dredge tail leveling on Granite Creek. (3) New fence construction (300ft) plus one watergap on Indian Creek/ Kuhl property. (4) Maintenance of all active project fences (58.76 miles), watergaps (56), spring developments (32) and plantings were checked and repairs performed. (5) Restoration and Enhancement projects protected 3 miles of stream within the basin. (6) Since the initiation of the Fish Habitat Project in 1984 we have 67.21 miles of stream protected using 124.2 miles of fence. With the addition of the Restoration and Enhancement Projects we have 199.06 miles of fence protecting 124.57 miles of stream.

  20. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  1. John Day River Subbasin Fish Habitat Enhancement Project, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Powell, Russ M.; Delano, Kenneth H.; Jerome, James P.

    2002-07-01

    Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest property. (3) Fence removal of 5010 ft. of barbed wire fence on the Meredith project. (4) Maintenance of all active project fences (66 miles), watergaps (76), spring developments (32) and plantings were checked and repairs performed. (5) Since the initiation of the Fish Habitat Project in 1984 we have 63.74 miles of stream protected using 106.78 miles of fence. With the addition of the Restoration and Enhancement Projects we have 180.64 miles of fence protecting 120.6 miles of stream.

  2. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NS&T) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  3. 94-1 Research and Development Project Lead Laboratory Support. Status report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-10-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects concerned with the management of plutonium and plutonium contaminated materials during the third quarter of FY96.

  4. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  5. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NSandT) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  6. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  7. Inspection Methods for Physical Protection Project: annual report, March-December 1981

    International Nuclear Information System (INIS)

    Bowden, D.D.; Green, J.N.; Minichino, C.; Thatcher, R.M.; Tyler, G.C.

    1982-01-01

    The report details the current production status of the expanded replacement inspection procedures for physical protection of power reactors, for strategic special nuclear material fixed sites, and for transportation of special nuclear material. In addition to the expanded replacement procedures, the final production status is reported for the new series of inspection procedures for special nuclear material of moderate and low strategic significance at fixed sites, for personnel training and qualifications plan (Appendix B to 10 CFR 73), for safeguards contingency plan (Appendix C to 10 CFR 73), and for licensee implementing procedures evaluation. Other deliverables, trips, management meetings, training, and changes in personnel are discussed

  8. Status of initial phase of site-specific seismic monitoring: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Rohay, A.C.

    1981-01-01

    This report presents the status of the initial phase of site-specific seismic monitoring work conducted under the Basalt Waste Isolation Project. This work is currently organized under two main elements: (1) a portable array; and (2) a baseline data collection array. Progress toward the development of each array is discussed along with an interpretation of preliminary data obtained from the test of a borehole seismometer at potential repository depths. The text is supplemented by nine figures and one table. 9 figs., 1 tab

  9. Present status of spallation target development. JAERI/KEK Joint Project

    International Nuclear Information System (INIS)

    Hino, R.; Kaminaga, M.; Haga, K.

    2001-01-01

    The Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting a plan to construct a neutron scattering facility under the JAERI/KEK Joint Project. Design and R and D works are being carried out vigorously for realizing the mercury target system consisting of the mercury target, moderators and reflectors working as a spallation neutron source, as well as a remote handling system for exchanging such components which will be highly irradiated. This report introduces an outline of the present status of design and development activities on the spallation target system. (author)

  10. Annual Status Report (FY2015) Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    Khaleel, R. [INTERA, Inc., Austin, TX (United States); Mehta, S. [CH2M Hill Plateau Remediation Company, Richland, WA (United States); Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2016-02-01

    This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Burial Grounds (LLBGs) since September 26, 1988. These estimates area calculated using the original does methodology developed in the performance assessment (PA) analysis (WHC-EP-0645).

  11. Swiss Photovoltaics Programme 2008 edition - Summary report, annual project abstracts for 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This comprehensive, illustrated report issued by the Swiss Federal Office of Energy (SFOE) presents an overview of activities in 2007 within the framework of the Swiss Photovoltaics Research Programme. Work completed in 2007 and the results achieved in the areas of cell technology, solar modules and building integration, electrical systems technology, supplementary projects and studies are summarised. National and international co-operation is examined. New, current and completed Pilot and Demonstration projects are reported on as are the prospects for the year 2008. The report is completed with lists of research and development as well as pilot and demonstration projects.

  12. Measuring radiation damage dynamics by pulsed ion beam irradiation: 2016 project annual report

    Energy Technology Data Exchange (ETDEWEB)

    Kucheyev, Sergei O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-01-04

    The major goal of this project is to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploits a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. For Year 3, this project had the following two major milestones: (i) the demonstration of the measurement of thermally activated defect-interaction processes by pulsed ion beam techniques and (ii) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, both of these milestones have been met.

  13. Workforce Projections 2010-2020: Annual Supply and Demand Forecasting Models for Physical Therapists Across the United States.

    Science.gov (United States)

    Landry, Michel D; Hack, Laurita M; Coulson, Elizabeth; Freburger, Janet; Johnson, Michael P; Katz, Richard; Kerwin, Joanne; Smith, Megan H; Wessman, Henry C Bud; Venskus, Diana G; Sinnott, Patricia L; Goldstein, Marc

    2016-01-01

    Health human resources continue to emerge as a critical health policy issue across the United States. The purpose of this study was to develop a strategy for modeling future workforce projections to serve as a basis for analyzing annual supply of and demand for physical therapists across the United States into 2020. A traditional stock-and-flow methodology or model was developed and populated with publicly available data to produce estimates of supply and demand for physical therapists by 2020. Supply was determined by adding the estimated number of physical therapists and the approximation of new graduates to the number of physical therapists who immigrated, minus US graduates who never passed the licensure examination, and an estimated attrition rate in any given year. Demand was determined by using projected US population with health care insurance multiplied by a demand ratio in any given year. The difference between projected supply and demand represented a shortage or surplus of physical therapists. Three separate projection models were developed based on best available data in the years 2011, 2012, and 2013, respectively. Based on these projections, demand for physical therapists in the United States outstrips supply under most assumptions. Workforce projection methodology research is based on assumptions using imperfect data; therefore, the results must be interpreted in terms of overall trends rather than as precise actuarial data-generated absolute numbers from specified forecasting. Outcomes of this projection study provide a foundation for discussion and debate regarding the most effective and efficient ways to influence supply-side variables so as to position physical therapists to meet current and future population demand. Attrition rates or permanent exits out of the profession can have important supply-side effects and appear to have an effect on predicting future shortage or surplus of physical therapists. © 2016 American Physical Therapy

  14. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    Energy Technology Data Exchange (ETDEWEB)

    Gales, S., E-mail: sydney.gales@eli-np.ro; Zamfir, N. V., E-mail: sydney.gales@eli-np.ro [ELI-NP, Horia Hulubei National Institute for Physics and Nuclear Engineering, 30 Reactorului Street, RO-077125 Bucharest-Magurele (Romania)

    2015-02-24

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as the science, applications and future perspectives will be discussed.

  15. Project RA Research nuclear reactor - Annual report 1993 with comparative review for the period 1991 - 1993

    International Nuclear Information System (INIS)

    1993-12-01

    Research reactor RA Annual report for year 1993 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. The ninth separate annex deals with the feasibility of RA reactor applications. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data [sr

  16. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  17. Projected increases in the annual flood pulse of the Western Amazon

    OpenAIRE

    Zulkafli, Z.; Buytaert, W.; Manz, B.; Rosas, C. V.; Willems, P.; Lavado-Casimiro, W.; Guyot, Jean-Loup; Santini, William

    2016-01-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research because of its rich biodiversity and the significant role of rainforests in carbon cycling. Climate change has also a direct hydrological impact, and increasing efforts have focused on understanding the hydrological dynamics at continental and subregional scales, such as the Western Amazon. New projections from the Coupled Model Inter-comparison Project Phase 5 ensemble indicate consistent climatic warming...

  18. Nuclear Fusion Project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-12-01

    Short communications give a survey of 38 technology tasks, the development of ECRH power sources at 150 GHz, and 8 NET study contracts. The fusion technology contracts and the NET contracts are listed in the appendices I and II, respectively, while the KfK departments contributing to the Fusion Project and the Fusion Project Management Staff are listed in appendices III and IV, respectively. (GG)

  19. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  20. Umatilla River Basin Anadromus Fish Habitat Enhancement Project. 1994 Annual report

    International Nuclear Information System (INIS)

    Shaw, R.T.

    1994-05-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing cooperative instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River in the vicinity of Gibbon, Oregon. In 1993, the project shifted emphasis to a comprehensive watershed approach, consistent with other basin efforts, and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. During the 1994--95 project period, a one river mile demonstration project was implemented on two privately owned properties on Wildhorse Creek. This was the first watershed improvement project to be implemented by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) off of the Reservation

  1. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd; Sexton, Amy D.

    2003-02-01

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on the mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included

  2. West Hackberry Tertiary Project. Annual report, September 3, 1997--September 2, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Gillham, T.H.

    1997-09-10

    The following report is the Project Management Plan for the fifth year of the West Hackberry Tertiary Project. The West Hackberry Tertiary Project is one of four mid-term projects selected by the United States Department of Energy (DOE) as part of the DOE`s Class 1 Program for the development of advance recovery technologies in fluvial dominated deltaic reservoirs. The West Hackberry Tertiary Project is a field test of the idea that air injection can be combined with the Double Displacement Process to produce a low cost tertiary recovery process which is economic at current oil prices. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering tertiary oil by gravity drainage. The Double Displacement Process is based upon the concept that in fields such as West Hackberry waterdrive recoveries are typically 50%-60% of the original oil in place while gravity drainage recoveries average 80%-90% of the original oil in place. Therefore, by injecting a gas into a watered out reservoir, a gas cap will form an additional oil can be recovered due to gravity drainage. Although the Double Displacement Process has been shown to be successful in recovering tertiary oil in other fields, this project will be the first to utilize air injection in the Double Displacement Process. The use of air injection in this process combines the benefits of air`s low cost and universal accessibility with the potential for accelerated oil recovery due to the combustion process. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process will result in an economically viable tertiary process in reservoirs where tertiary oil recovery is presently uneconomical.

  3. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 2005. Progress report

    International Nuclear Information System (INIS)

    2005-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  4. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Labour of the Federal Republic of Germany. Reporting period 2004. Progress report

    International Nuclear Information System (INIS)

    2004-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  5. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Labour of the Federal Republic of Germany. Reporting period 2004. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  6. Western Gas Sands Project. Status report, 1 June--30 June 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This edition of the WGSP status report summarizes June 1979 progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977, status report, NVO/0655-100. Work by the USGS toward resource assessment in the four primary study areas continued. CK GeoEnergy started a core hole in Grand County, Utah. During June, projects of the National Laboratories and Energy Technology Centers continued. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques. Experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. The CER Corporation RB-MHF 3 final report has been distributed. Cyclic gas injection began again on CIG's Sprague No. 1 well. The DOE well test facility was transported to Vernal, Utah for minor repairs and storage. The GPE wells, Natural Buttes Units 9, 14 and 18 flowed to sales. The Mitchell Energy Muse-Duke No. 1 well flowed 3,000 MCFD in June. Attempts to kill the Mobil PCU F31-13G well failed. Exploratory coring of the Sandia Hole No. 6 Formation Interface Fracture Experiment resumed in June.

  7. Evaluation of the health status of six volunteers from the Mars 500 project using pulse analysis.

    Science.gov (United States)

    Shi, Hong-Zhi; Fan, Quan-Chun; Gao, Jian-Yi; Liu, Jun-Lian; Bai, Gui-E; Mi, Tao; Zhao, Shuang; Liu, Yu; Xu, Dong; Guo, Zhi-Feng; Li, Yong-Zhi

    2017-08-01

    To comprehensively evaluate the health status of 6 volunteers from the Mars 500 Project through analyzing their pulse graphs and determining the changes in cardiovascular function, degree of fatigue and autonomic nervous function. Six volunteers were recruited; all were male aged 26-38 years (average 31.83±4.96 years). Characteristic parameters reflflecting the status of cardiovascular functions were extracted, which included left ventricular contraction, vascular elasticity and peripheral resistance. The degree of fatigue was determined depending on the difference between the calendar age and biological age, which was calculated through the analysis of blood pressure value and characteristic parameters. Based on the values of pulse height variation and pulse time variation on a 30-s pulse graph, autonomic nervous function was evaluated. All parameters examined were marked on an equilateral polygon to form an irregular polygon of the actual fifigure, then health status was evaluated based on the coverage area of the actual fifigure. The results demonstrated: (1) volunteers developed weakened pulse power, increased vascular tension and peripheral resistance, and slight decreased ventricular systolic function; (2) the degree of fatigue was basically mild or moderate; and (3) autonomic nervous function was excited but generally balanced. These volunteers were in the state of sub-health. According to Chinese medicine theories, such symptoms are mainly caused by the weakening of healthy qi, Gan (Liver) failing in free coursing, and disharmony between Gan and Wei (Stomach), which manifests as a weak and string-like pulse.

  8. SERI Solar Radiation Resource Assessment Project: Fiscal Year 1990 Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Riordan, C; Maxwell, E; Stoffel, T; Rymes, M; Wilcox, S

    1991-07-01

    The purpose of the Solar Radiation Resource Project is to help meet the needs of the public, government, industry, and utilities for solar radiation data, models, and assessments as required to develop, design, deploy, and operate solar energy conversion systems. The project scientists produce information on the spatial (geographic), temporal (hourly, daily, and seasonal), and spectral (wavelength distribution) variability of solar radiation at different locations in the United States. Resources committed to the project in FY 1990 supported about four staff members, including part-time administrative support. With these resources, the staff must concentrate on solar radiation resource assessment in the United States; funds do not allow for significant efforts to respond to a common need for improved worldwide data. 34 refs., 21 figs., 6 tabs.

  9. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  10. NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Mather, B. A.; Shah, S.; Norris, B. L.; Dise, J. H.; Yu, L.; Paradis, D.; Katiraei, F.; Seguin, R.; Costyk, D.; Woyak, J.; Jung, J.; Russell, K.; Broadwater, R.

    2014-06-01

    In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

  11. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2007

    International Nuclear Information System (INIS)

    Nishio, Kazuhisa; Matsuoka, Toshiyuki; Tsuruta, Tadahiko; Amano, Kenji; Ohyama, Takuya; Takeuchi, Ryuji; Saegusa, Hiromitsu; Hama, Katsuhiro; Mizuno, Takashi; Sai, Masataka; Hirano, Toru; Iyatomi, Yosuke; Shimada, Akiomi; Matsui, Hiroya; Ogata, Nobuhisa; Uchida, Masahiro; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru

    2009-03-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) Project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase I), Construction Phase (Phase II) and Operation Phase (Phase III). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in fiscal year 2007, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  12. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2005

    International Nuclear Information System (INIS)

    Nishio, Kazuhisa; Matsuoka, Toshiyuki; Tsuruta, Tadahiko; Amano, Kenji; Ohyama, Takuya; Takeuchi, Ryuji; Saegusa, Hiromitsu; Hama, Katsuhiro; Mizuno, Takashi; Sai, Masataka; Iyatomi, Yosuke; Shimada, Akiomi; Ogata, Nobuhisa; Uchida, Masahiro; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru; Yoshida, Haruo; Nakama, Shigeo; Seno, Yasuhiro; Kuroda, Hidetaka; Semba, Takeshi

    2009-03-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase 1), Construction Phase (Phase 2) and Operation Phase (Phase 3). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in 2005 fiscal year, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  13. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2008

    International Nuclear Information System (INIS)

    Takeuchi, Shinji; Kunimaru, Takanori; Nishio, Kazuhisa; Tsuruta, Tadahiko; Matsuoka, Toshiyuki; Hayano, Akira; Takeuchi, Ryuji; Saegusa, Hiromitsu; Ohyama, Takuya; Mizuno, Takashi; Hirano, Toru; Ogata, Nobuhisa; Hama, Katsuhiro; Iyatomi, Yosuke; Shimada, Akiomi; Matsui, Hiroya; Ito, Hiroaki; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru

    2010-07-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) Project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase 1), Construction Phase (Phase 2) and Operation Phase (Phase 3). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in fiscal year 2008, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  14. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R.Todd

    1996-05-01

    During the 1995 - 96 project period, four new habitat enhancement projects were implemented under the Umatilla River Basin Anadromous Fish Habitat Enhancement Project by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) in the upper Umatilla River Basin. A total of 38,644 feet of high tensile smooth wire fencing was constructed along 3.6 miles of riparian corridor in the Meacham Creek, Wildhorse Creek, Greasewood Creek, West Fork of Greasewood Creek and Mission Creek watersheds. Additional enhancements on Wildhorse Creek and the lower Greasewood Creek System included: (1) installation of 0.43 miles of smooth wire between river mile (RM) 10.25 and RM 10.5 Wildhorse Creek (fence posts and structures had been previously placed on this property during the 1994 - 95 project period), (2) construction of 46 sediment retention structures in stream channels and maintenance to 18 existing sediment retention structures between RM 9.5 and RM 10.25 Wildhorse Creek, and (3) revegetation of stream corridor areas and adjacent terraces with 500 pounds of native grass seed or close species equivalents and 5,000 native riparian shrub/tree species to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. U.S. Fish and Wildlife Service (USFWS), Bureau of Indian Affairs (BIA) and Environmental Protection Agency (EPA) funds were cost shared with Bonneville Power Administration (BPA) funds, provided under this project, to accomplish habitat enhancements. Water quality monitoring continued and was expanded for temperature and turbidity throughout the upper Umatilla River Watershed. Physical habitat surveys were conducted on the lower 13 river miles of Wildhorse Creek and within the Greasewood Creek Project Area to characterize habitat quality and to quantify various habitat types by area.

  15. Long ecological half-lives in seminatural systems. Annual report 1996. Project plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The EKO-2 project, `Long ecological half-lives in semi-natural systems`, consists of three subprojects; sheep grazing on uncultivated pasture, mushrooms and freshwater fish. The main aim is to identify the contribution from semi-natural systems, by determining ecological half-lives for specific foodstuffs from these areas, and thus determine dose to man. In the three ongoing projects we have produced or used data for 8-10 years after the Chernobyl accident. The time series have been very necessary for predicting ecological half-lives for radiocesium and radiostrontium. Unfortunately, the data for radiostrontium have been very scarce. The recovery of Nordic ecosystems from contamination by {sup 137}Cs originating from the Chernobyl accidents is gradually slowing down, at the same time as areas vary widely in susceptibility and recovery rates. The projects have given us useful understanding of the mechanisms governing the transfer of radionuclides, and more knowledge about typical Nordic ecosystems. The soil - vegetation - sheep - system is being studied in five countries; Iceland, the Faeroe Islands, Denmark, Sweden and Norway. Co-ordinated collection of soil, vegetation and meet samples have been performed every year since 1990. After a slow start in 1994, many results from the project `Transfer of radiocesium via mushrooms to roe deer and man (the forest project)` have been published during 1996. Questionnaires have been implemented in Sweden, Denmark and Finland, in Sweden and Denmark with focus on mushrooms, and a more thorough investigation in Finland on natural products for consumption. The main aim in the project `Ecological half-lives in limnic ecosystems` has been to investigate the processes and mechanisms leading to radiocesium being easily available for uptake in e.g. fish. Systematic collection of data has enabled the construction of a GIS system to show fallout levels of {sup 137}Cs, influence from catchment areas, and prediction of {sup 137}Cs in fish

  16. Long ecological half-lives in seminatural systems. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The EKO-2 project, 'Long ecological half-lives in semi-natural systems', consists of three subprojects; sheep grazing on uncultivated pasture, mushrooms and freshwater fish. The main aim is to identify the contribution from semi-natural systems, by determining ecological half-lives for specific foodstuffs from these areas, and thus determine dose to man. In the three ongoing projects we have produced or used data for 8-10 years after the Chernobyl accident. The time series have been very necessary for predicting ecological half-lives for radiocesium and radiostrontium. Unfortunately, the data for radiostrontium have been very scarce. The recovery of Nordic ecosystems from contamination by 137 Cs originating from the Chernobyl accidents is gradually slowing down, at the same time as areas vary widely in susceptibility and recovery rates. The projects have given us useful understanding of the mechanisms governing the transfer of radionuclides, and more knowledge about typical Nordic ecosystems. The soil - vegetation - sheep - system is being studied in five countries; Iceland, the Faeroe Islands, Denmark, Sweden and Norway. Co-ordinated collection of soil, vegetation and meet samples have been performed every year since 1990. After a slow start in 1994, many results from the project 'Transfer of radiocesium via mushrooms to roe deer and man (the forest project)' have been published during 1996. Questionnaires have been implemented in Sweden, Denmark and Finland, in Sweden and Denmark with focus on mushrooms, and a more thorough investigation in Finland on natural products for consumption. The main aim in the project 'Ecological half-lives in limnic ecosystems' has been to investigate the processes and mechanisms leading to radiocesium being easily available for uptake in e.g. fish. Systematic collection of data has enabled the construction of a GIS system to show fallout levels of 137 Cs, influence from catchment areas, and prediction of 137 Cs in fish. (EG)

  17. John Day River Subbasin Fish Habitat Enhancement Project, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neal, Jeff A.; Jerome, James P.; Delano, Kenneth H.

    2001-01-01

    During 2000, 3 new projects were completed thereby adding 4.6 miles of stream to the program. Protection for these reaches required the construction of 3.2 miles of riparian fence and 1 livestock watering sites. 5,750 pounds of grass and shrub seed were planted for revegetating ground disturbed during construction. Stream temperatures were monitored on the Middle Fork of the John Day. All project fences, watergaps, spring developments and plantings were checked and repairs performed where needed. We now have 70 miles of stream protected using 111 miles of fence.

  18. 2008 Annual Report: Project to combat the Tsetse Fly and Trypanosomiasis in the Niayes

    International Nuclear Information System (INIS)

    2009-03-01

    The overall objective of this project is to contribute to the fight against poverty by promoting the development in the Niayes area of integrated livestock systems that can increase the incomes of local populations. This program is coordinated by the Directorate of Veterinary Services (DSV) in partnership with the Senegalese Institute for Agricultural Research (ISRA) for the research component and the Ecological Monitoring Center (CSE) for the Geographic Information System (GIS).The Center for International Cooperation in Agronomic Research for Development (CIRAD) provides scientific support to the project. Between 2007 and 2008, a feasibility study (entomological, parasitological, genetic and socio-economic studies) to characterize the area was carried out.

  19. 2011 Annual Report: Project to combat the Tsetse fly and Trypanosomiasis in the Niayes

    International Nuclear Information System (INIS)

    2012-02-01

    The procedure for obtaining an environmental discharge was initiated from 2010 onwards by the setting up of a protocol on the environmental impact assessment and the preparation of the Strategic Environmental Assessment (SEA) file. A public hearing was organized in August 2011 in Kayar to inform all stakeholders (local populations, administrative and local authorities, technical services, etc.) of the ins and outs of the Project and of the monitoring and mitigation plan of the environmental impacts advocated. The Ministry in charge of the Environment through the Directorate of Environment and Designated Establishments has overseen and validated the entire process which will be closed by the issuance of environmental discharge to the Project.

  20. Scientific Discovery through Advanced Computing (SciDAC-3) Partnership Project Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Forest M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bochev, Pavel B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Cameron-Smith, Philip J.. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Easter, Richard C [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Elliott, Scott M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ghan, Steven J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Liu, Xiaohong [Univ. of Wyoming, Laramie, WY (United States); Lowrie, Robert B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lucas, Donald D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ma, Po-lun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sacks, William J. [National Center for Atmospheric Research (NCAR), Boulder, CO (United States); Shrivastava, Manish [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Singh, Balwinder [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tautges, Timothy J. [Argonne National Lab. (ANL), Argonne, IL (United States); Taylor, Mark A. [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Vertenstein, Mariana [National Center for Atmospheric Research (NCAR), Boulder, CO (United States); Worley, Patrick H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2014-01-15

    The Applying Computationally Efficient Schemes for BioGeochemical Cycles ACES4BGC Project is advancing the predictive capabilities of Earth System Models (ESMs) by reducing two of the largest sources of uncertainty, aerosols and biospheric feedbacks, with a highly efficient computational approach. In particular, this project is implementing and optimizing new computationally efficient tracer advection algorithms for large numbers of tracer species; adding important biogeochemical interactions between the atmosphere, land, and ocean models; and applying uncertainty quanti cation (UQ) techniques to constrain process parameters and evaluate uncertainties in feedbacks between biogeochemical cycles and the climate system.

  1. Nuclear fusion project. Annual report of the Association Forschungszentrum Karlsruhe/EURATOM. October 1994 - September 1995

    International Nuclear Information System (INIS)

    Kast, G.

    1996-01-01

    Today about fifty percent of FZK's fusion programme is contracted to ITER via the contribution of the European home team. With the recent selection of blanket concepts in the European frame, a concentration process has been initiated which will result in some restructuring of the blanket programme. The results are documented. Closely related to blanket development is the long term materials programme. FZK has concentrated on reduced activation ferritic-martensitic steels. Important project resources for irradiation and hot cell work are devoted to characterize and improve the performance of suitable structural materials. ITER references are given in the nomenclature. The annexes provide with some information on departments and project management. (DG)

  2. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cousins, Katherine [Idaho Department of Fsh and Game

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  3. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    McGowan, Vance

    2003-08-01

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream

  4. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, R. Todd

    1993-04-01

    The Umatilla Basin Anadromous Fish Habitat Enhancement Project is funded under the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program Measure 704 (d) (1) 34.02 and targets the improvement of water quality and restoration of riparian areas, holding, spawning and rearing habitats of steelhead, spring and fall chinook and coho salmon. The project focused on implementing instream and riparian habitat improvements on private lands on the Umatilla Indian Reservation (hereafter referred to as Reservation) from April 1, 1988 to March 31, 1992. These efforts resulted in enhancement of the lower 1/4 mile of Boston Canyon Creek, the lower 4 river miles of Meacham Creek and 3.2 river miles of the Umatilla River (downstream of the Meacham Creek confluence upstream to the Reservation East Boundary). In 1993, the project shifted emphasis to a comprehensive watershed approach consistent with other basin efforts and began to identify upland and riparian watershed-wide causative factors impacting fisheries habitat and natural fisheries production capabilities throughout the Umatilla River Watershed. Maintenance of existing habitat improvement projects was included under this comprehensive approach. Maintenance of existing gravel traps, instream and bank stabilization structures was required within project areas during the reporting period due to spring flooding damage and high bedload movement. Maintenance activities were completed between river mile (RM) 0.0 and RM 0.25 Boston Canyon Creek, between RM 0.0 and RM 4 Meacham Creek and between RM 78.5 and RM 79 Umatilla River. Habitat enhancement areas were seeded with native grass, legume, shrub and wildflower mixes and planted with willow cuttings to assist in floodplain recovery, stream channel stability and filtering of sediments during high flow periods. Water quality monitoring continued for temperature and turbidity throughout the upper Umatilla River Watershed. Survey of cross sections and

  5. Status of the S.E. Geysers effluent pipeline & injection project

    Energy Technology Data Exchange (ETDEWEB)

    Dellinger, M. [Lake County Sanitation District, Lakeport, CA (United States)

    1997-12-31

    A unique public/private partnership of local, state, federal, and corporate stakeholders is constructing the world`s first wastewater-to-electricity system in Lake County, California. A rare example of a genuinely {open_quotes}sustainable{close_quotes} system, three Lake County communities will recycle their treated wastewater effluent through the Geysers geothermal steamfield to produce an estimated 625,000 MWh of electricity annually from six existing geothermal power plants. The concept is shown schematically. Construction was initiated in October 1995, and as of this writing, the system is approximately 85% complete. Operational start-up is expected in October 1997. The key to the project`s success thus far has been its emphasis on cooperative action among affected stakeholders; and a broad, community-based view of solving problems rather than the traditional, narrower view of engineering-driven technical solutions. Special attention has been given to environmentally-responsive engineering design to avoid or minimize adverse environmental impacts.

  6. Present status and future directions of the Mayo/IBM PACS project

    Science.gov (United States)

    Morin, Richard L.; Forbes, Glenn S.; Gehring, Dale G.; Salutz, James R.; Pavlicek, William

    1991-07-01

    This joint project began in 1988 and was motivated by the need to develop an alternative to the archival process in place at that time (magnetic tape) for magnetic resonance imaging and neurological computed tomography. In addition, this project was felt to be an important step in gaining the necessary clinical experience for the future implementation of various aspects of electronic imaging. The initial phase of the project was conceived and developed to prove the concept, test the fundamental components, and produce performance measurements for future work. The key functions of this phase centered on attachment of imaging equipment (GE Signa) and archival processes using a non-dedicated (institutionally supplied) local area network (LAN). Attachment of imaging equipment to the LAN was performed using commercially available devices (Ethernet, PS/2, Token Ring). Image data were converted to ACR/NEMA format with retention of the vendor specific header information. Performance measurements were encouraging and led to the design of following projects. The second phase has recently been concluded. The major features of this phase have been to greatly expand the network, put the network into clinical use, establish an efficient and useful viewing station, include diagnostic reports in the archive data, provide wide area network (WAN) capability via ISDN, and establish two-way real-time video between remote sites. This phase has heightened both departmental and institutional thought regarding various issues raised by electronic imaging. Much discussion regarding both present as well as future archival processes has occurred. The use of institutional LAN resources has proven to be adequate for the archival function examined thus far. Experiments to date have shown that use of dedicated resources will be necessary for retrieval activities at even a basic level. This report presents an overview of the background present status and future directions of the project.

  7. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  8. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  9. Safety against releases in severe accidents. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The work scope of the RAK-2 project is divided into three sub-projects: RAK-2.1 Severe Accident Phenomenology; RAK-2.2 Computerised Accident Management; RAK-2.3 Reactors In Nordic Surroundings. The work in subproject 1 progresses roughly according to budget and time schedule. Some adjustments in the technical work scope were made during 1996. Main tasks of RAK-2.1 in 1996: Complete recriticality studies for Nordic BWRs; Investigate phenomena related to late phase melt progression; Issue and NKS Final Technical Report on KTH experiments. Main tasks of RAK-2.2 in 1996: CAMS would be further developed with signal validation, tracking simulation, state identification and PSA and risk monitoring applications; Carry out a feasibility study for development of a PWR version of CAMS in collaboration with EdF, France; Use CAMS in the Halden Man-Machine laboratory to perform human factor studies. Main tasks of RAK-2.3 in 1996: Collect and report data from the British reactor types AGR, MAGNOX and PWR; Make a report on accidents in nuclear ships; Put the collected data together in a common data base covering neighbour reactors treated in SIK-3 and RAK-2.3; Update the data in the former SIK-3 report if needed. The work in project 2 progresses according to plans. The data collection of British reactors with in sub-project 3 has been delayed significantly due to difficulty of obtaining information from some of the British utilities, but the problems are expected to be solved by the end of 1997. (EG)

  10. Annual Report of the Tandem Accelerator Center, Nuclear and Solid State Research Project, University of Tsukuba

    International Nuclear Information System (INIS)

    1978-01-01

    In 1977, 12 UD Pelletron tandem accelerator has been operated by the University's researchers and engineers. Except for the tank opening for regular inspection we met twice the troubles which forced to change the accelerating tube. The experiences teach us that it needs about 20 days to finish the conditioning after changing the accelerating tube. A sputter ion source of new version is now being installed on the top floor. Two devices for the detection of X-rays were tested. An apparatus for bombardment of samples in air for biological and medical sciences has been successfully used. The subjects of researches on nuclear physics cover the light-ion reactions, heavy-ion reactions and nuclear spectroscopy. A special emphasis has been put on the measurements on vector- and tensor-analyzing powers in the light-ion reactions, because of a higher efficiency of the polarized ion source. Elaborate works on the heavy-ion reactions including the angular correlation patterns and excitation functions have been made in parallel. Papers of these works are now being prepared, a few having been published already. Moreover, in the University of Tsukuba, a new research system, called Special Research Project on Nuclear and Solid State Sciences Using Accelerated Beams (Nuclear and Solid State Research Project) started in 1978 and will continue for five years. In this research project, researchers from various Institutes in the University of Tsukuba, as well as visiting researchers from other institutions in Japan and from abroad, participate. Using a variety of accelerated beams, i.e. of heavy, light and polarized beams, this research project aims mainly at the high excitation, short life, transient and inhomogeneous states both in nuclear and extra-nuclear world. It covers both fundamental research in nuclear, atomic and solid state sciences as well as their application in various fields. (J.P.N.)

  11. Evaluation and monitoring of wild/natural steelhead trout production: project progress report, 1996; ANNUAL

    International Nuclear Information System (INIS)

    Leth, Brian D.; Holubetz, Terry; Nemeth, Doug

    2000-01-01

    This project was initiated to provide additional, and more definitive, information regarding wild steelhead Oncorhynchus mykiss populations in Idaho. Important streams for wild steelhead production were identified and selected for monitoring. Monitoring activities employed among streams varied, but generally included: aerial redd counts, placement of adult weirs, enumeration of juveniles through mask and snorkel counts, and emigrant trapping. This report details activities during the 1996 field season

  12. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reporting period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.

  13. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  14. Annual evaluation of routine radiological survey/monitoring frequencies for the High Ranking Facilities Deactivating Project at Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-12-01

    The Bethel Valley Watershed at the Oak Ridge National Laboratory (ORNL) has several Environmental Management (EM) facilities that are designated for deactivation and subsequent decontamination and decommissioning (D and D). The Surplus Facilities Program at ORNL provides surveillance and maintenance support for these facilities as deactivation objectives are completed to reduce the risks associated with radioactive material inventories, etc. The Bechtel Jacobs Company LLC Radiological Control (RADCON) Program has established requirements for radiological monitoring and surveying radiological conditions in these facilities. These requirements include an annual evaluation of routine radiation survey and monitoring frequencies. Radiological survey/monitoring frequencies were evaluated for two High Ranking Facilities Deactivation Project facilities, the Bulk Shielding Facility and Tower Shielding Facility. Considerable progress has been made toward accomplishing deactivation objectives, thus the routine radiological survey/monitoring frequencies are being reduced for 1999. This report identifies the survey/monitoring frequency adjustments and provides justification that the applicable RADCON Program requirements are also satisfied

  15. Social status of rural women in the focus of a developmental project

    Directory of Open Access Journals (Sweden)

    Stjepanović-Zaharijevski Dragana

    2006-01-01

    Full Text Available One of the goals of the project called "The milky river", which deals with the integral development of the dairy production, is to initiate the development of the sustainable and profitable production of milk and dairy products through grouping producers and supporting their position in the society they live in. Women are more than men engaged in the dairy production chain and they have a direct view of the whole dairy production process. So it was necessary to adapt the grouping to their needs, as well as to make some practical mechanisms of their involvement in the project activities. In this way, the strategy of the project helped with offering equal chances to women and men, and by reducing the gender inequality, it also helped with making a chance for a new life perspective for women. Through interviews and by focus-grouping the data were collected which represented the first picture of the dairy production in the region of Niš, including its gender characteristics, among other things. Two years later, the qualitative analysis of the indicators of the rural women’s social status in this region in the context of the realization of the project activities, has shown that there has been an important movement forward towards the gender equality which can be attributed to the successful project implementation. Women, as an important factor in the dairy production chain, seem to be joined and encouraged. They seem to be empowered at the level of their knowledge decision making and autonomous activity taking through various forms of education, joint farmer group work, as well as through various forms of cooperation with supporting institutions and other partners within the project activity framework. The overwhelming impression seems to be that joint work and cooperation are necessary conditions for the development of any individual farmers’ production, as well as for the referent rural development which requires the support of all the

  16. Status of national CO{sub 2}-mitigation projects and initiatives in the Philippine energy sector

    Energy Technology Data Exchange (ETDEWEB)

    Tupas, C.T.

    1996-12-31

    The Philippines has a huge energy requirement for the next 30 years in order to achieve its economic growth target. Based on an expected annual GDP growth rate of 6.9 percent, the Philippines total energy requirement is estimated to increase at an average of 6.6 percent annually from 1996 to 2025. Gross energy demand shall increase from 219.0 million barrels of fuel oil equivalent (MMBFOE) in 1996 to 552.4 MMBFOE in 2010 and 1,392.6 MMBFOE by 2025. These energy demand levels shall be driven primarily by the substantial increase in fuel requirements for power generation whose share of total energy requirement is 28.3 percent in 1996, 48.0 percent in 2010 and 55.0 percent in 2025. With the expected increase in energy demand, there will necessarily be adverse impacts on the environment. Energy projects and their supporting systems - from fuel extraction and storage to distribution - can and will be major contributors not only to local but also to regional and global environmental pollution and degradation. International experiences and trends in greenhouse gas (GHG) emissions inventory have shown that the energy sector has always been the dominant source of carbon dioxide (CO{sub 2}) - the principal contributor to global climate change. The energy sector`s CO{sub 2} emissions come primarily from fossil fuels combustion. Since energy use is the dominant source of CO{sub 2} emissions, efforts should therefore be concentrated on designing a mitigation strategy in this sector.

  17. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project Annual Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Sear, Sheri

    2001-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection- 1990-91) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation-1992-96). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI

  18. Lake Roosevelt Rainbow Trout : Habitat/Passage Improvement Project Annual Report 1999.

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Charles D.

    2000-02-01

    Lake Franklin D. Roosevelt was created with the completion of the Grand Coulee Dam in 1942. The lake stretches 151 miles up-stream to the International border between the United States and Canada at the 49th parallel. Increased recreational use, subsistence and sport fishing has resulted in intense interest and possible exploitation of the resources within the lake. Previous studies of the lake and its fishery have been limited. Early studies indicate that natural reproduction within the lake and tributaries are not sufficient to support a rainbow trout (Onchoryhnchus mykiss) fishery (Scholz et. al., 1988). These studies indicate that the rainbow trout population may be limited by lack of suitable habitat for spawning and rearing (Scholz et. al., 1988). The initial phase of this project (Phase I, baseline data collection- 1990-91) was directed at the assessment of limiting factors such as quality and quantity of available spawning gravel, identification of passage barriers, and assessment of other limiting factors. Population estimates were conducted using the Seber/LeCren removal/depletion method. After the initial assessment of stream parameters, several streams were selected for habitat/passage improvement projects (Phase II, implementation-1992-96). At the completion of project habitat improvements, the final phase (Phase III, monitoring) began. This phase will assess changes and gauge the success achieved through the improvements. The objective of the project is to correct passage barriers and improve habitat conditions of selected tributaries to Lake Roosevelt for adfluvial rainbow trout that utilize tributary streams for spawning and rearing. Streams with restorable habitats were selected for improvements. Completion of improvement efforts should increase the adfluvial rainbow trout contribution to the resident fishery in Lake Roosevelt. Three co-operating agencies, the Confederated Tribes of the Colville Reservation (CCT), the Spokane Tribe of Indians (STI

  19. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential

  20. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Schroder, Steven L.; Young, Sewall F. (Washington Department of Fish and Wildlife, Olympia, WA)

    2002-11-01

    Genetic work for 2001 consisted of two major phases, both reported on here. The first is a DNA microsatellite analysis of several hundred juveniles from the experimental spawning channel at the Cle Elum Supplementation Research Facility, using the genetic markers to assign the juveniles to parents, and thus judge reproductive success of individual fish. The second is a reevaluation and revision of plans for studying domestication in the spring chinook supplementation effort. The pedigree analysis was significant in three respects. First, it showed that this approach can be successfully applied to the spawning channel research. Secondly it showed that this approach does indeed yield very useful information about the relative reproductive success of fish in the channel. Finally, it showed that this information can yield additional information about the experimental design. Of the 961 juveniles on which analysis was attempted, 774 yielded enough genetic information to be used in the pedigree analysis. Of these, 754 were assigned to males and females known to have been placed into the channel. Of the other 20, all were assignable to females, but sires were unknown. The genotypes of 17 of these were consistent with a single theoretical male genotype, suggesting a single precocial male sired them. The inferred parentage of the fish demonstrated that there had been substantial leakage of juveniles from one section of the channel into another. Reproductive success of females was fairly even, but success of males varied considerably. In a group of seven males (including the hypothetical one), one contributed 79% of the progeny analyzed, and three contributed none. The domestication experimental design evaluation was prompted by a critical review of the project by the Independent Scientific Review Panel (ISRP). The ISRP review set into motion a design revision process which extended beyond the contract period; the report presented here is intended to be an account of our