WorldWideScience

Sample records for program formulary management

  1. Formulary management in the Department of Defense.

    Science.gov (United States)

    Trice, Shana; Devine, Joshua; Mistry, Harsha; Moore, Eugene; Linton, Andrea

    2009-03-01

    community pharmacies and mail order, and change in product mix and pharmacy type (point of service). An additional $60 million in rebates were obtained in FY 2007 through the Voluntary Agreements for TRICARE Retail Pharmacy Refunds (UF VARR) program for prescriptions filled at community pharmacies; the UF VARR program first became available for drug classes reviewed in August 2006. The total of $986 million in cost avoidance and rebates represents an approximate 13% reduction, compared with what DoD otherwise would have paid in FY 2007 ($7.5 billion, compared with actual drug expenditures of $6.5 billion). As in most private-sector health plans, the DoD formulary management process (a) includes rigorous decision making that is informed by clinical literature evaluations and pharmacoeconomic analyses, (b) results in drug formulary changes that require considerable effort in communication with providers and beneficiaries, and (c) produces drug cost savings derived from increased price competition among drug manufacturers. Unlike private sector health plans, the DoD uses more disclosure of the results of evaluation of the evidence, solicits provider opinions before P&T committee deliberation, and provides the opportunity for beneficiaries to have input before implementation of formulary changes.

  2. Implementation of a formulary management process.

    Science.gov (United States)

    Karel, Lauren I; Delisle, Dennis R; Anagnostis, Ellena A; Wordell, Cindy J

    2017-08-15

    The application of lean methodology in an initiative to redesign the formulary maintenance process at an academic medical center is described. Maintaining a hospital formulary requires clear communication and coordination among multiple members of the pharmacy department. Using principles of lean methodology, pharmacy department personnel within a multihospital health system launched a multifaceted initiative to optimize formulary management systemwide. The ongoing initiative began with creation of a formulary maintenance redesign committee consisting of pharmacy department personnel with expertise in informatics, automation, purchasing, drug information, and clinical pharmacy services. The committee met regularly and used lean methodology to design a standardized process for management of formulary additions and deletions and changes to medications' formulary status. Through value stream analysis, opportunities for process and performance improvement were identified; staff suggestions on process streamlining were gathered during a series of departmental kaizen events. A standardized template for development and dissemination of monographs associated with formulary additions and status changes was created. In addition, a shared Web-based checklist was developed to facilitate information sharing and timely initiation and completion of tasks involved in formulary status changes, and a permanent formulary maintenance committee was established to monitor and refine the formulary management process. A clearly defined, standardized process within the pharmacy department was developed for tracking necessary steps in enacting formulary changes to encourage safe and efficient workflow. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  3. Formulary management of ACE inhibitors.

    Science.gov (United States)

    Gerbrandt, K R; Yedinak, K C

    1996-12-01

    An increasing number of ACE inhibitors have become available in recent years. Because these agents are all similar, careful scrutiny is required in order to determine specific advantages of particular agents when making formulary decisions. Differences between agents with regard to structure and tissue specificity have been identified, but the clinical relevance of these differences is not clear. ACE inhibitors vary greatly with regard to bioconversion, distribution and elimination. Disease states such as congestive heart failure (CHF) and hepatic or renal insufficiency may affect the disposition of specific ACE inhibitors. These agents may differ substantially in duration of action, and ACE inhibitors that are given once daily may optimise patient compliance and decrease costs. ACE inhibitors have been extensively studied in patients with hypertension, CHF or nephropathy, and following myocardial infarction (MI). Differences in efficacy between agents are often a result of variations in study design, or because nonequipotent dosages were compared. It is likely that the benefits of ACE inhibitors are class effects, and it is probably reasonable to use an agent even if large scale clinical trials have not been performed with that particular drug. Few differences have been found between ACE inhibitors with regard to adverse effects or drug interactions, and these factors are of minor importance when making formulary decisions. Cost and availability may vary among agents, and will depend on geographical location and institution-specific purchasing contracts. ACE inhibitors have shown positive effects on quality of life when compared with agents of other classes. Quality-of-life studies that have directly compared ACE inhibitors have produced conflicting results. In the setting of hypertension, cost-effectiveness evaluations typically find that the newer, longer-acting ACE inhibitors provide the greatest financial benefit. Differences in cost effectiveness in the post

  4. How drug life-cycle management patent strategies may impact formulary management.

    Science.gov (United States)

    Berger, Jan; Dunn, Jeffrey D; Johnson, Margaret M; Karst, Kurt R; Shear, W Chad

    2016-10-01

    Drug manufacturers may employ various life-cycle management patent strategies, which may impact managed care decision making regarding formulary planning and management strategies when single-source, branded oral pharmaceutical products move to generic status. Passage of the Hatch-Waxman Act enabled more rapid access to generic medications through the abbreviated new drug application process. Patent expirations of small-molecule medications and approvals of generic versions have led to substantial cost savings for health plans, government programs, insurers, pharmacy benefits managers, and their customers. However, considering that the cost of developing a single medication is estimated at $2.6 billion (2013 dollars), pharmaceutical patent protection enables companies to recoup investments, creating an incentive for innovation. Under current law, patent protection holds for 20 years from time of patent filing, although much of this time is spent in product development and regulatory review, leaving an effective remaining patent life of 7 to 10 years at the time of approval. To extend the product life cycle, drug manufacturers may develop variations of originator products and file for patents on isomers, metabolites, prodrugs, new drug formulations (eg, extended-release versions), and fixed-dose combinations. These additional patents and the complexities surrounding the timing of generic availability create challenges for managed care stakeholders attempting to gauge when generics may enter the market. An understanding of pharmaceutical patents and how intellectual property protection may be extended would benefit managed care stakeholders and help inform decisions regarding benefit management.

  5. Propuesta de un formulario abierto para un programa de atención médica dirigida en México Open formulary propossal for a managed care program in Mexico

    Directory of Open Access Journals (Sweden)

    1999-01-01

    sell in Mexico, as part of a Pharmacy Benefit Management & Manage Care program implemented in our country. Each drug was classified according to its active ingredient under one of the following categories: 1 essentials, 2 excluded, and 3 not essentials - not excluded. The decision in each case was based on pure scientific grounds and using an Evidence-Based Medicine analysis. Results. The proposed formulary contains a total of 1106 active ingredients -either unique or in combination-, from which 429 (38.8% were classified as essentials. About one-out-of-ten drugs (8.7% currently in use within the private medical practice in Mexico, some of them highly prescribed, were regarded by the committee as excluded due to concerns about their efficacy and/or or safety. Conclusions. On this report a detailed description of the process followed to conform the committee, its objectives an its performing criteria is presented, as well as the bases under which the final list of drugs of the formulary were set.

  6. Use of health-related quality of life information in managed care formulary decision-making.

    Science.gov (United States)

    Wu, Wenchen Kenneth; Sause, Robert B; Zacker, Christopher

    2005-12-01

    The extent to which the increased volume of available health-related quality of life (HRQOL) information and heightened education has increased the acceptance and use of HRQOL remains unclear. Likewise, the value of HRQOL information in the formulary decision-making process continues to be undefined. To investigate the perceptions and use of HRQOL by managed care decision-makers in the formulary development process. A mail survey was sent to a nationwide sample of 108 Academy of Managed Care Pharmacy (AMCP) members who were involved in formulary management. Survey candidates were identified according to their job titles listed in the 1999-2000 AMCP membership directory. The survey process began in May 2000 and ended in August 2000. The main outcome measures included (a) managed care formulary decision-makers' assessment of HRQOL as a treatment outcome, (b) the existing role and future use of HRQOL information in formulary decisions, and (c) the level of understanding of HRQOL concepts and the benefits attributable to favorable HRQOL results. A response rate of 51.9% was obtained. Most of the respondents (>70%) believed that patients consider HRQOL as an important treatment outcome. Fewer respondents (43%) felt that payers view HRQOL outcomes as an important quality indicator. Most respondents (95%) considered HRQOL data in making formulary decisions, and many (73%) believe that HRQOL outcomes will play a more important role in future formulary decisions. Respondents indicated a better understanding of disease-specific and generic HRQOL measurements than utility measurement and interpretation of results. A minority of respondents (34%) would be willing to pay a higher price for a product with better HRQOL outcomes. When asked which factors would lead to increased use of HRQOL information, respondents indicated that health care cost savings and increased productivity were considered important (77% and 65%, respectively). A drug product with better HRQOL outcomes

  7. Variation in Formulary Management Practices Within the Department of Veterans Affairs Health Care System.

    Science.gov (United States)

    Radomski, Thomas R; Good, Chester B; Thorpe, Carolyn T; Zhao, Xinhua; Marcum, Zachary A; Glassman, Peter A; Lowe, John; Mor, Maria K; Fine, Michael J; Gellad, Walid F

    2016-02-01

    All Department of Veterans Affairs Medical Centers (VAMCs) operate under a single national drug formulary, yet substantial variation in prescribing and spending exists across facilities. Local management of the national formulary may differ across VAMCs and may be one cause of this variation. To characterize variation in the management of nonformulary medication requests and pharmacy and therapeutics (P&T) committee member perceptions of the formulary environment at VAMCs nationwide. We performed an online survey of the chief of pharmacy and an additional staff pharmacist and physician on the P&T committee at all VAMCs. Respondents were asked questions regarding criteria for use for nonformulary medications, specific procedures for ordering nonformulary medications in general and specific lipid-lowering and diabetes agents, the appeals process, and the formulary environment at their VAMCs. We compared responses across facilities and between chiefs of pharmacy, pharmacists, and physicians. A total of 212 chief pharmacists (n = 80), staff pharmacists (n = 78), and physicians (n = 54) responded, for an overall response rate of 49%. In total, 107/143 (75%) different VAMCs were represented. The majority of VAMCs reported adhering to national criteria for use, with 38 (36%) being very adherent and 69 (65%) being mostly adherent. There was substantial variation between VAMCs regarding how nonformulary drugs were ordered, evaluated, and appealed. The nonformulary lipid-lowering drugs ezetimibe, rosuvastatin, and atorvastatin were viewable to providers in the order entry screen at 67 (63%), 67 (63%), and 64 (60%) VAMCs, respectively. The nonformulary diabetes medication pioglitazone was only viewable at 58 (55%) VAMCs. In the remaining VAMCs, providers could not order these nonformulary drugs through the normal order-entry process. For questions about the formulary environment, physician respondent perceptions differed from those of staff pharmacists and chief pharmacists

  8. The adoption of mental health drugs on state AIDS drug assistance program formularies.

    Science.gov (United States)

    Martin, Erika G; Barry, Colleen L

    2011-06-01

    We sought state-level factors associated with the adoption of medications to treat mental health conditions on state formularies for the AIDS Drug Assistance Program. We interviewed 22 state and national program experts and identified 7 state-level factors: case burden, federal dollar-per-case Ryan White allocation size, political orientation, state wealth, passage of a mental health parity law, number of psychiatrists per population, and size of mental health budget. We then used survival analysis to test whether the factors were associated with faster adoption of psychotropic drugs from 1997 to 2008. The relative size of a state's federal Ryan White HIV/AIDS Program allocation, the state's political orientation, and its concentration of psychiatrists were significantly associated with time-to-adoption of psychotropic drugs on state AIDS Drug Assistance Program formularies. Substantial heterogeneity exists across states in formulary adoption of drugs to treat mental illness. Understanding what factors contribute to variation in adoption is vital given the importance of treating mental health conditions as a component of comprehensive HIV care.

  9. Management of Hospital Formularies in Ontario: Challenges within a Local Health Integration Network.

    Science.gov (United States)

    Burke, Natasha; Bowen, James M; Troyan, Sue; Jegathisawaran, Jathishinie; Gosse, Carolyn; Tonkin, Marita; Kagoma, Sandra; Goeree, Ron; Holbrook, Anne

    2016-01-01

    Expenditures on drugs dispensed and administered to patients in Canadian hospitals have been estimated at $2.4 billion per year. Pharmacy and therapeutics (P&T) committees play a key role in the evaluation and management of drug therapies in this setting. Hospitals differ with respect to the composition of these committees, their members' expertise, and the processes used for making formulary decisions. To examine the current processes for formulary drug review from the perspective of P&T committees and their individual members, and to examine the needs and preferences of these stakeholders related to evidence review and potential collaborative drug review processes within a large Local Health Integration Network (LHIN) in Ontario. Twenty-three sites within 10 hospital corporations in LHIN 4 (Hamilton Niagara Haldimand Brant) were recruited. A 2-part questionnaire was developed and pretested for clarity and comprehensiveness. The institution profile section of the questionnaire was to be completed by pharmacy directors and the P&T section by committee members. Ten pharmacy directors and 28 committee members representing 10 P&T committees responded. A mean of 6.4 new drug requests were reviewed annually by each P&T committee. Across the LHIN, the workload associated with reviewing submissions for new drugs to be added to the formulary represented 0.84 full-time equivalent. The quality of clinical evidence in the drug submissions was rated more favourably than the quality of economic evidence; furthermore, the use of economic evidence was limited by a lack of health economics expertise within the committees. A centralized review process for the LHIN was perceived as beneficial to improve efficiency, the quality of review, and standardization, and also to reduce costs. Across the Hamilton Niagara Haldimand Brant LHIN, considerable time and resources are spent on the review of potential new drugs for addition to the hospitals' formularies. A standardized formulary

  10. Impact of formulary restriction with prior authorization by an antimicrobial stewardship program.

    Science.gov (United States)

    Reed, Erica E; Stevenson, Kurt B; West, Jessica E; Bauer, Karri A; Goff, Debra A

    2013-02-15

    In an era of increasing antimicrobial resistance and few antimicrobials in the developmental pipeline, many institutions have developed antimicrobial stewardship programs (ASPs) to help implement evidence-based (EB) strategies for ensuring appropriate utilization of these agents. EB strategies for accomplishing this include formulary restriction with prior authorization. Potential limitations to this particular strategy include delays in therapy, prescriber pushback, and unintended increases in use of un-restricted antimicrobials; however, our ASP found that implementing prior authorization for select antimicrobials along with making a significant effort to educate clinicians on criteria for use ensured more appropriate prescribing of these agents, hopefully helping to preserve their utility for years to come.

  11. Rational pharmacotherapy in The Netherlands : formulary management in Dutch hospitals

    NARCIS (Netherlands)

    Fijn, R; de Jong-van den Berg, LTW; Brouwers, JRBJ

    A survey regarding the management of rational pharmacotherapy was conducted among all Dutch general hospitals in 1998. The response was 99% (n = 120). The presence of a drugs and therapeutics committee and antibiotic policies in Dutch general hospitals appears independent of hospital

  12. Nullius in verba: The University of Minnesota Social and Administrative Pharmacy Program proposed Guidelines for Formulary Evaluations

    Directory of Open Access Journals (Sweden)

    Paul C Langley

    2016-07-01

    Full Text Available The University of Minnesota Social and Administrative Pharmacy Program proposed Guidelines for Formulary Evaluations (GFE are designed to focus on the credibility of clinical and cost-outcomes claims in formulary decision making. The last few years have witnessed increasing concern over the credibility of trial based efficacy claims, with a surprisingly high proportion of claims falling short. At the same time cost-outcomes claims, where comparative clinical claims are a key input, have been presented where the claims made are not open to experimental or observational assessment. This follows from standards recommended for modeled and simulated claims. In the absence of cost-outcomes claims being presented in an evaluable form, it is impossible not only to replicate the claim or to judge whether or not it is credible. Claims for product value based on such claims are unacceptable. The guidelines proposed here are designed to overcome these limitations and support an evidence base that is both credible and replicable for formulary decisions. This is achieved by focusing on short-term modeled or simulated claims for cost-effectiveness. The requirement for modeled or simulated claims that are evaluable within a time frame that is meaningful for formulary decisions marks a major departure from format submissions already in play, not only in the US but in other developed economies. Rather than subscribing to the gold standard of long term or lifetime cost-per-QALY claims a short-term time horizon of no more than 2-years is recommended. This allows products to be provisionally placed on formulary but subject to a protocol that supports an evaluation to be reported back to a formulary committee as part of ongoing disease area or therapeutic class reviews. The place of the product and its contracted price can then be reviewed. Conflict of Interest None Type: Commentary

  13. Formulary Management and Antimicrobial Stewardship: a 7-year Evaluation at an Integrated Health-System

    Science.gov (United States)

    Veve, Michael P; Morin, Amy; Kenney, Rachel M; Makowski, Charles T; Davis, Susan L

    2017-01-01

    Abstract Background The antimicrobial formulary is a key tool in antimicrobial stewardship (ASP). Agents added to formulary typically are those that have been formally reviewed and determined to have a place in therapy in a given facility. Non-formulary (NF) agents generally are those that have not been requested, or were deemed not optimal based on spectrum, formulation, or cost. We evaluated NF antimicrobial orders to identify possible gaps in optimal use and process. Methods IRB-exempt ecological evaluation of NF antimicrobial use in multi-site healthcare system. Anonymous data collected: NF antimicrobial agents ordered between 2010–2017. Drug use characteristics: class, duration, availability of formulary alternatives, and time since FDA approval. Descriptive statistics were used to characterize NF use. Additional formulary processes evaluated: requests, reviews, and decisions. Results 2041 NF antimicrobial were ordered for 44 different agents, representing 14 days. 185 orders were placed for new drugs (within 12 months of FDA-approval), 73% were for HIV agents. 11 of 44 NF agents were subsequently added to the formulary. During the study period, 17 antimicrobial were requested for either inpatient or outpatient formulary addition; all were approved with use criteria or infectious diseases restriction. Of 16 antimicrobial agents FDA-approved during the study period, 6 were requested and added to the inpatient formulary. Fifty-two percent of agents had alternatives in the same class on formulary at the time of use. Potential safety problems identified: dose and duration of therapy. Conclusion Formulary structure provides systematic approach for drug selection, dose, and duration. Monitoring NF antimicrobials use can aid in identification of ASP priorities, with implications for medication safety and patient outcomes. Disclosures S. L. Davis, Allergan: Grant Investigator and Scientific Advisor, Consulting fee and Research grant. Merck: Grant Investigator and

  14. The Affordable Care Act, health care reform, prescription drug formularies and utilization management tools.

    Science.gov (United States)

    Ung, Brian L; Mullins, C Daniel

    2015-01-01

    The U.S. Patient Protection and Affordable Care Act (hence, Affordable Care Act, or ACA) was signed into law on March 23, 2010. Goals of the ACA include decreasing the number of uninsured people, controlling cost and spending on health care, increasing the quality of care provided, and increasing insurance coverage benefits. This manuscript focuses on how the ACA affects pharmacy benefit managers and consumers when they have prescriptions dispensed. PBMs use formularies and utilization control tools to steer drug usage toward cost-effective and efficacious agents. A logic model was developed to explain the effects of the new legislation. The model draws from peer-reviewed and gray literature commentary about current and future U.S. healthcare reform. Outcomes were identified as desired and undesired effects, and expected unintended consequences. The ACA extends health insurance benefits to almost 32 million people and provides financial assistance to those up to 400% of the poverty level. Increased access to care leads to a similar increase in overall health care demand and usage. This short-term increase is projected to decrease downstream spending on disease treatment and stunt the continued growth of health care costs, but may unintentionally exacerbate the current primary care physician shortage. The ACA eliminates limitations on insurance and increases the scope of benefits. Online health care insurance exchanges give patients a central location with multiple insurance options. Problems with prescription drug affordability and control utilization tools used by PBMs were not addressed by the ACA. Improving communication within the U.S. healthcare system either by innovative health care delivery models or increased usage of health information technology will help alleviate problems of health care spending and affordability. Copyright © 2015 Elsevier Inc. All rights reserved.

  15. A systematic literature review assessing the directional impact of managed care formulary restrictions on medication adherence, clinical outcomes, economic outcomes, and health care resource utilization.

    Science.gov (United States)

    Happe, Laura E; Clark, Deanna; Holliday, Edana; Young, Tramaine

    2014-07-01

    There is extensive literature demonstrating that formulary restrictions reduce the pharmacy costs and utilization of restricted drugs. However, some research suggests that there may be unintended consequences of formulary restrictions on other patient outcomes. While several literature reviews have assessed the relationship between formulary restrictions and medication adherence, clinical outcomes, economic outcomes, or health care resource utilization, these reviews were either not systematic, were conducted more than 5 years ago, or did not assess the aggregate directional impact of the relationships. To conduct a systematic literature review assessing the direction (positive, negative, or neutral) of the relationship between managed care formulary restrictions (including step therapy, cost sharing, prior authorization, preferred drug lists, and quantity limits) on medication adherence, clinical outcomes, economic outcomes, and health care resource utilization.  Articles published in 1993 or later were identified from PubMed using 2 lists of search terms. List A included 12 formulary restriction terms and List B included 12 patient outcomes terms, resulting in 144 unique search term combinations. Each article was evaluated by 2 investigators against the following exclusion criteria using a stepwise approach: (a) the article was a commentary or review article; (b) the article did not assess the impact of managed care formulary restrictions on outcomes; and (c) the study was conducted outside the United States. The total number of studies was reported by formulary restriction type. Next, the total number of outcomes reported in each study was summed to conduct an outcomes-level analysis. The outcomes were categorized by type of outcome (medication adherence, clinical, economic, or health care resource utilization) and direction of association (positive, negative, or neutral/not significant) based on the relationship reported in each study. The frequencies of each

  16. A pharmacoeconomics and formulary management collaborative project to teach decision analysis principles.

    Science.gov (United States)

    Cavanaugh, Teresa M; Buring, Shauna; Cluxton, Robert

    2012-08-10

    To implement and assess the effectiveness of a 2-course collaborative decision analysis project intended to help students understand the relevance of pharmacoeconomics to clinical pharmacy practice and provide them an opportunity to apply skills taught in pharmacoeconomics to a "real world" problem. Students were assigned a pair of drugs, 1 commonly used as standard therapy and 1 newly approved, and conducted a decision analysis. The results were then used in a mock pharmacy and therapeutics (P&T) committee meeting. Ninety-eight of 106 (92%) students completed a 4-question survey instrument. Ninety-six percent of students agreed or somewhat agreed that the decision analysis project met the learning objectives. Students felt the shared assignment influenced their choice of formulary drug, augmented understanding of factors influencing decisions, broadened their thinking about drug costs, and was a good approximation of a "real world" application. An innovative joint-course assignment proved to be a successful technique for teaching decision analysis.

  17. Creating a shared formulary in 7 critical access hospitals.

    Science.gov (United States)

    Wakefield, Douglas S; Ward, Marcia M; Loes, Jean L; O'Brien, John; Abbas, Nancy

    2010-01-01

    This paper reports a case study of 7 Critical Access Hospitals' (CAH) and 1 rural referral hospital's successful collaboration to develop a shared formulary. Study methods included document reviews, interviews with key informants, and use of descriptive statistics. Through a systematic review and decision process, CAH formularies ranging in size from 667 to 1,351 items were compared, rationalized, and consolidated resulting in an 803-item shared formulary. While the individual CAHs were generally expected to list and stock the same 803 items in the shared formulary's pharmacy information system, they could individually determine the amount to be stocked for each item, as well as stock additional items not included on the shared formulary to reflect local provider preferences and services provided. Final stocked formulary items ranged from 592 to 786 items among the 7 CAHs. Major challenges and lessons learned in the course of developing a shared formulary related to: Meeting Logistics, Facilitator to Manage the Process, Organizing the Review Process, Management Support, Stakeholder Participation, Working Collaboratively, Decision-Making Process, Clarity of Charge, Meeting the Needs of Unique Services, Communicating with Providers, and Adjusting to a Shared Formulary. Collaborating in the development of a shared formulary allows for a greater range of decision-making expertise, shared workload, and an improved formulary. An organized and well-managed group decision-making process is essential to a successful collaboration.

  18. Accuracy of pharmacy benefit manager medication formularies in an electronic health record system and the Epocrates mobile application.

    Science.gov (United States)

    Andrus, Miranda R; Forrester, Jeanne B; Germain, Kenda E; Eiland, Lea S

    2015-04-01

    Physicians commonly use formulary medication coverage information generated by electronic heath records (EHRs) and the Epocrates mobile drug database application when making medication selection decisions. Nonformulary selections may lead to higher out-of-pocket patient costs and nonadherence with prescribed regimens. Nonformulary selections also contribute to higher overall health plan spending. However, the accuracy of these systems compared with actual insurance coverage is not known.  To assess the accuracy of formulary status icons generated by an EHR system and the Epocrates mobile application for patients with Alabama Medicaid and Blue Cross Blue Shield of Alabama (BCBS), the primary insurance providers in the state of Alabama. Patients of all ages who had a chart review performed at the outpatient family medicine or pediatric clinics at the University of Alabama at Birmingham Huntsville Medical Regional Campus from May to October 2013 were included in this retrospective analysis. Patients who were not insured by either Alabama Medicaid or BCBS were excluded. Patients who did not have new medications added at the time of the visit were also excluded. For each medication prescribed, the formulary status provided in the EHR system and Epocrates was compared with the actual Medicaid and BCBS formularies published online, and the accuracy of the 2 databases was determined.  A total of 1,529 medication records were analyzed. The EHR and Epocrates provided accurate formulary information for 93.1% and 89.4% of medications, respectively. Formulary information generated by the EHR was 96.3% accurate for Medicaid patients and 80.1% accurate for BCBS patients. Epocrates was 88.2% accurate for Medicaid patients and 94.4% accurate for BCBS patients. A total of 936 medication records from the pediatric clinic were analyzed, and the majority of these patients (88.4%) had Medicaid insurance. In this population, the EHR was more accurate (96.9%) than Epocrates (86.6%). Of

  19. Formulary management of 2 new agents: lorcaserin and phentermine/topiramate for weight loss.

    Science.gov (United States)

    Kelly, Elizabeth M; Tungol, Alexandra A; Wesolowicz, Laurie A

    2013-10-01

    Obesity may lead to the development of multiple chronic disease states, including hypertension, dyslipidemia, and type 2 diabetes mellitus. Over a half billion adults worldwide are affected by obesity, and more than two-thirds of adults are either obese or overweight in the United States. Diet and exercise have been the mainstays of treatment in this population; however, once failed, noninvasive, long-term effective treatment modality is lacking, and medications may potentially fill the void. Lorcaserin and phentermine/topiramate were approved by the FDA in June 2012 and July 2012, respectively, as adjuncts to diet and exercise for chronic weight management of obese (body mass index [BMI] ≥ 30 kg/m2) or overweight (BMI ≥ 27 kg/m2) individuals with comorbidities. To review the phase 3 trials of lorcaserin and phentermine/topiramate and provide managed care considerations that may be taken into account as a result. A MEDLINE review was performed for articles published and available through September 17, 2012, using keywords "lorcaserin" or "phentermine/topiramate" with an emphasis on phase 3 trials. The literature search was limited to randomized controlled trials in humans published in the English language. Additional information on lorcaserin from its FDA review was obtained from the FDA website. 5 pivotal phase 3 trials were identified: 3 for lorcaserin and 2 for phentermine/topiramate. Both agents demonstrated a statistically significant higher proportion of individuals who lost ≥ 5% of body weight, as well as higher mean weight loss when compared with placebo. Safety concerns for lorcaserin include cardiac valvulopathy and increased risk of psychiatric, cognitive, and serotonergic adverse effects. Teratogenicity and increased heart rate are major safety concerns regarding phentermine/topiramate. Health care decision makers have many factors to consider when developing strategies to fight obesity. Despite a great need for new therapies to treat

  20. Constraints on Formulary Design Under the Affordable Care Act.

    Science.gov (United States)

    Andersen, Martin

    2017-12-01

    I study the effect of prescription drug essential health benefits (EHB) requirements from the Affordable Care Act on prescription drug formularies of health insurance marketplace plans. The EHB regulates the number of drugs covered but leaves other dimensions (cost sharing and utilization management) of the formulary unregulated. Using data on almost all formularies in the country, I demonstrate that requiring insurers to cover one additional drug adds 0.22 drugs (3.3%) to the average formulary, mostly owing to firms increasing the number of drugs covered to comply with the EHB requirement. The EHB requirement also increases the probability that a drug is subject to utilization management and is assigned to a higher (more costly) formulary tier. My results suggest that newly covered drugs are 22.3 percentage points more likely to be subject to utilization management, compared to 36.7% for the average covered drug. Using formularies for Medicare Advantage plans, which are subject to uniform, nationwide benefit design standards, and the formulary status of newly approved drugs that do not satisfy the EHB requirement, I reject the hypotheses that consumer demand or effects on plan entry can explain my results. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  1. Building a better online formulary.

    Science.gov (United States)

    McCreadie, Scott R; Stumpf, Janice L; Benner, Todd D

    2002-10-01

    The history of and improvements made to the University of Michigan Health System (UMHS) inpatient online formulary are described. The current formulary at UMHS is the third version of the Web-based formulary. The original effort in 1997 consisted of converting word-processing documents to HTML format and exporting this information to the university's intranet. There was no mechanism to search for formulary items, no therapeutic class cross-referencing, and no cost information. Documents and their conversion had to be manually maintained. The second version incorporated a series of automatic daily computer downloads from the inpatient pharmacy computer system. Web pages were built to dynamically display the formulary information from the database based on users' requests. The formulary enabled searching by brand or generic names, provided therapeutic category cross-references, listed the location of products within automated dispensing cabinets, provided accurate cost information, and was always up-to-date. Maintenance efforts drastically decreased. The current version has incorporated additional logic to meet users' needs. If no matches are found, the system expands its search by automatically linking to UMHS's inpatient pharmacy system repository of all drugs, finding matches to what the user entered, and then returning the names of therapeutically similar formulary agents to the user. A cross-index feature allows the system to return all the drugs that fall under the searched therapeutic category. Dramatic improvements have been made to UMHS's inpatient online formulary in the past two years. The current formulary provides a very low-cost, easily maintainable, and effective means to access the formulary and clinically relevant and timely information specific to each medication.

  2. Potential savings of harmonising hospital and community formularies for chronic disease medications initiated in hospital.

    Directory of Open Access Journals (Sweden)

    Lauren Lapointe-Shaw

    Full Text Available Hospitals in Canada manage their formularies independently, yet many inpatients are discharged on medications which will be purchased through publicly-funded programs. We sought to determine how much public money could be saved on chronic medications if hospitals promoted the initiation of agents with the lowest outpatient formulary prices.We used administrative databases for the province of Ontario to identify patients initiated on a proton pump inhibitor (PPI, angiotensin-converting enzyme (ACE inhibitor or angiotensin receptor blocker (ARB following hospital admission from April 1(st 2008-March 31(st 2009. We assessed the cost to the Ontario Drug Benefit Program (ODB over the year following initiation and determined the cost savings if prescriptions were substituted with the least expensive agent in each class.The cost for filling all PPI, ACE inhibitor and ARB prescriptions was $ 2.48 million, $968 thousand and $325 thousand respectively. Substituting the least expensive agent could have saved $1.16 million (47% for PPIs, $162 thousand (17% for ACE inhibitors and $14 thousand (4% for ARBs over the year following discharge.In a setting where outpatient prescriptions are publicly funded, harmonising outpatient formularies with inpatient therapeutic substitution resulted in modest cost savings and may be one way to control rising pharmaceutical costs.

  3. The effect of a three-tier formulary on antidepressant utilization and expenditures.

    Science.gov (United States)

    Hodgkin, Dominic; Parks Thomas, Cindy; Simoni-Wastila, Linda; Ritter, Grant A; Lee, Sue

    2008-06-01

    Health plans in the United States are struggling to contain rapid growth in their spending on medications. They have responded by implementing multi-tiered formularies, which label certain brand medications 'non-preferred' and require higher patient copayments for those medications. This multi-tier policy relies on patients' willingness to switch medications in response to copayment differentials. The antidepressant class has certain characteristics that may pose problems for implementation of three-tier formularies, such as differences in which medication works for which patient, and high rates of medication discontinuation. To measure the effect of a three-tier formulary on antidepressant utilization and spending, including decomposing spending allocations between patient and plan. We use claims and eligibility files for a large, mature nonprofit managed care organization that started introducing its three-tier formulary on January 1, 2000, with a staggered implementation across employer groups. The sample includes 109,686 individuals who were continuously enrolled members during the study period. We use a pretest-posttest quasi-experimental design that includes a comparison group, comprising members whose employer had not adopted three-tier as of March 1, 2000. This permits some control for potentially confounding changes that could have coincided with three-tier implementation. For the antidepressants that became nonpreferred, prescriptions per enrollee decreased 11% in the three-tier group and increased 5% in the comparison group. The own-copay elasticity of demand for nonpreferred drugs can be approximated as -0.11. Difference-in-differences regression finds that the three-tier formulary slowed the growth in the probability of using antidepressants in the post-period, which was 0.3 percentage points lower than it would have been without three-tier. The three-tier formulary also increased out-of-pocket payments while reducing plan payments and total spending

  4. Attitude and opinion towards essential medicine formulary.

    Science.gov (United States)

    Sharma, Sangeeta; Kh, Reeta; Chaudhury, R Roy

    2010-06-01

    The Delhi State Drug Policy was adopted in 1994 following which the first Essential Medicines List (EML) was developed in 1996. The Delhi State Essential Medicines Formulary was brought out in 1997. A need was felt to revise the formulary to match with the EML as the EML is renewed every 2 years. A survey was undertaken to elicit the opinions of the doctors practicing in the state on the usefulness of the formulary before revising and printing the updated version. The survey covered dispensaries, 10-20 bedded hospitals, 100-bedded hospitals and two tertiary care hospitals. Discussions were focused on questionnaires on attitudes toward adopting Essential Medicines Formulary using a 10-point scale. Of the 200 doctors approached, only 90 doctors completed the questionnaire. Sixty-nine respondents (76.6%) had received the copy of the formulary. Most practitioners welcomed the formulary and were satisfied with the coverage and selection of the medicines. Most respondents (76.9%) agreed that a well-developed formulary would improve the quality of the public health care system, although they had reservations about the authority, relevance and effect on professional autonomy. About 74% of the respondents used the formulary in clinical practice as a source of medicine information, which makes its regular revision necessary.

  5. Using RxNorm for cross-institutional formulary data normalization within a distributed grid-computing environment.

    Science.gov (United States)

    Wynden, Rob; Anderson, Nick; Casale, Marco; Lakshminarayanan, Prakash; Anderson, Kent; Prosser, Justin; Errecart, Larry; Livshits, Alice; Thimman, Tim; Weiner, Mark

    2011-01-01

    Within the CTSA (Clinical Translational Sciences Awards) program, academic medical centers are tasked with the storage of clinical formulary data within an Integrated Data Repository (IDR) and the subsequent exposure of that data over grid computing environments for hypothesis generation and cohort selection. Formulary data collected over long periods of time across multiple institutions requires normalization of terms before those data sets can be aggregated and compared. This paper sets forth a solution to the challenge of generating derived aggregated normalized views from large, distributed data sets of clinical formulary data intended for re-use within clinical translational research.

  6. Tribal Waste Management Program

    Science.gov (United States)

    The EPA’s Tribal Waste Management Program encourages environmentally sound waste management practices that promote resource conservation through recycling, recovery, reduction, clean up, and elimination of waste.

  7. Decision analysis in the formulary process.

    Science.gov (United States)

    Kessler, J M

    1997-11-15

    The use of decision analysis as a tool in making formulary decisions is discussed. Decision analysis is best applied in formulary decisions when factors other than acquisition costs are important in determining overall treatment costs for two products. The decision-analysis process assigns probabilities and costs to various treatments and outcomes. In the case of acute myocardial infarction, the decision analyst would gather data on angioplasty and thrombolysis and assign probabilities and costs for each treatment and subsequent endpoints on the basis of clinical trial data. When such data do not exist, estimates may be generated by expert panels. Applying clinical trial data to an individual hospital is not straightforward because of differences between clinical trials and clinical practice. Analysts and clinicians should evaluate any proposed model for its robustness and adaptability to local conditions and practitioner variation. Access to internal hospital data is essential in developing the model. An ideal decision-analysis model includes all important available interventions and defines and discloses the analyst's time frame and financial perspective. After implementation of the formulary decision, the results can be monitored and, if necessary, adjustments can be made in the allocation of resources. Barriers to effective decision analysis include lack of data and differences in sources of cost and outcome data. Despite the current limitations of decision analysis, clinicians and policymakers may find this technique increasingly useful in the complex formulary process.

  8. Joint Program Management Handbook

    Science.gov (United States)

    1994-12-01

    by that Service. The Program/Product Manger, the Program / Project Management Office , and, in turn, the functional elements of each Participating...manning document for the Program/ Project Management Office which will incorporate the positions to be occupied by representatives of the Participating...Participating Service Senior Representative(s) within the Program/ Project Management Office will: (1) Speak for his parent Service in all matters

  9. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  10. 78 FR 5781 - Cost-Sharing Rates for Pharmacy Benefits Program of the TRICARE Program

    Science.gov (United States)

    2013-01-28

    ... benefits program as $5 for generic medications, $17 for formulary medications and $44 for non-formulary medications for not more than a 30-day supply obtained through retail pharmacies, and $0 for generic medications, $13 for formulary medications, and $43 for non-formulary medications for not more than a 90-day...

  11. Unstable slope management program.

    Science.gov (United States)

    2009-08-01

    This Rapid Response Project gathered information on existing unstable slope management programs, with a : focus on asset management practices in the United States and overseas. On the basis of this study, the research : team summarized and recommende...

  12. Program Management Tool

    Science.gov (United States)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  13. Obsolescence Management Program Development

    Energy Technology Data Exchange (ETDEWEB)

    Clancey, C.; Santoro, R.

    2015-07-01

    The nuclear power operators have minimal control over when a manufacturer discontinues supporting or fabricating replacement parts and components, however, proactive planning can minimize the impact and potential high costs of these obsolescence issues. The objective of an obsolescence management program is to ensure that obsolescence is managed as an integral part of plant processes, from identification and prioritization of upcoming challenges, to implementation of obsolescence solutions. This ensures that the impact of obsolescence on equipment reliability is minimized and the most cost-effective solution is implemented. This paper presents an industry proven obsolescence management program development strategy. (Author)

  14. The standard for program management

    CERN Document Server

    2017-01-01

    The Standard for Program Management – Fourth Edition differs from prior editions by focusing on the principles of good program management. Program activities have been realigned to program lifecycle phases rather than topics, and the first section was expanded to address the key roles of program manager, program sponsor and program management office. It has also been updated to better align with PMI’s Governance of Portfolios, Programs, and Projects: A Practice Guide.

  15. Program management model study

    Science.gov (United States)

    Connelly, J. J.; Russell, J. E.; Seline, J. R.; Sumner, N. R., Jr.

    1972-01-01

    Two models, a system performance model and a program assessment model, have been developed to assist NASA management in the evaluation of development alternatives for the Earth Observations Program. Two computer models were developed and demonstrated on the Goddard Space Flight Center Computer Facility. Procedures have been outlined to guide the user of the models through specific evaluation processes, and the preparation of inputs describing earth observation needs and earth observation technology. These models are intended to assist NASA in increasing the effectiveness of the overall Earth Observation Program by providing a broader view of system and program development alternatives.

  16. Validating a hospital medicines formulary survey in the Western Pacific Region--a global hospital pharmacy initiative based on the Basel Statements.

    Science.gov (United States)

    Penm, Jonathan; Chaar, Betty; Moles, Rebekah

    2012-01-01

    In 2008, the Basel Statements were developed to reflect the future of hospital pharmacy worldwide. Included were a key set of statements regarding the expanding role of hospital pharmacists' influence on prescribing from the management of medicines formularies to being an active member of the therapeutic decision-making process. This study aimed to validate a survey to measure Basel Statement 26 regarding the role of medicines formularies and the factors that affect its use in the Western Pacific Region (WPR). The survey was developed in consultation with a WPR advisory group and current literature. The survey was translated using the forward-backward method into Chinese (simplified) and Vietnamese. The instrument was pilot tested in a stratified random sample of 260 hospital pharmacy directors in the WPR. Principal components analysis (PCA) was applied to the data to assess construct validity of the Medicines Formulary Scale that assessed responders' perceptions of their formulary and impact on utilization. The Medicines Formulary Survey was completed by 107 hospital pharmacy directors or equivalent. The survey contained the Medicines Formulary Scale in addition to questions regarding the content and review process of the hospital's formulary as well as demographic questions. Application of the PCA procedures resulted in a parsimonious 2-factor solution in which 33.8% of the variance was explained. The Cronbach alpha for the 17-item scale was found to be 0.70. The Cronbach alpha values for the first and second factor/subscales were 0.76 and 0.68, respectively. The Medicines Formulary Survey appears reliable and valid for assessing hospital pharmacy directors' perceptions of hospital medicine formularies in the WPR. Further development of validated instruments to assess other areas of hospital pharmacy practice will help track the progression of hospital pharmacy and aid in globalization of the profession. Copyright © 2012 Elsevier Inc. All rights reserved.

  17. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  18. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T.G. [U.S. Environmental Protection Agency, NC (United States); Markin, S. [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S.V. [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1995-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  19. The Pathway to a Safe and Effective Medication Formulary for Exploration Spaceflight

    Science.gov (United States)

    Daniels, V. R.; Bayuse, T. M.; Mulcahy, R. A.; Mcguire, R. K. M.; Antonsen, E. L.

    2017-01-01

    PURPOSE: Exploration space missions pose several challenges to providing a comprehensive medication formulary designed to accommodate the size and space limitations of the spacecraft; while addressing the individual medications needs and preferences of the Crew; the negative outcome of a degrading inventory over time, the inability to resupply before expiration dates; and the need to properly forecast the best possible medication candidates to treat conditions that will occur in the future. METHODS: The Pharmacotherapeutics Discipline has partnered with the Exploration Medical Capabilities (ExMC) Element to develop and propose a research pathway that is comprehensively focused on evidence-based models and theories, as well as on new diagnostic tools and treatments or preventive measures aimed at closure of the Med02 “Pharmacy” Gap; defined in the Human Research Program’s (HRP) risk-based research strategy. The Med02 Gap promotes the challenge to identify a strategy to ensure that medications used to treat medical conditions during exploration space missions are available, safe, and effective. It is abundantly clear that pharmaceutical intervention is an essential component of risk management planning for astronaut healthcare during exploration space. However, the quandary still remains of how to assemble a formulary that is comprehensive enough to prevent or treat anticipated medical events; and is also chemically stable, safe, and robust enough to have sufficient potency to last for the duration of an exploration space mission. In cases where that is not possible, addressing this Gap requires exploration of novel drug development techniques, dosage forms, and dosage delivery platforms that enhance chemical stability as well as therapeutic effectiveness. RESULTS: The proposed research pathway outlines the steps, processes, procedures, and a research portfolio aimed at identifying a capability that will provide a safe and effective pharmacy for any specific

  20. Assessment of indicators for hospital drug formulary non-adherence

    NARCIS (Netherlands)

    Fijn, R; Lenderink, AW; Egberts, ACG; Brouwers, JRBJ; De Jong-Van DenBerg, LTW

    2001-01-01

    Background: Translation of rational drug therapy into practice remains an international problem. Although pharmacotherapeutic treatment guidelines (PTGs) as managerial tools are favoured over hospital drug formularies (HDFs), the latter are still applied in most hospitals. HDF enforcement often

  1. Prescription Drug Plan Formulary, Pharmacy Network, and P...

    Data.gov (United States)

    U.S. Department of Health & Human Services — These public use files contain formulary, pharmacy network, and pricing data for Medicare Prescription Drug Plans and Medicare Advantage Prescription Drug Plans...

  2. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  3. Fluor Hanford Safety Management Program

    Energy Technology Data Exchange (ETDEWEB)

    WILLIAMS, J.D.

    2003-02-06

    This document summarizes safety management programs used within the scope of the project Hanford Management Contract (PHMC). The document had been developed to meet the format & content requirements of DOE-STD-3009-94, CH-2.

  4. TWRS Configuration management program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  5. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    Energy Technology Data Exchange (ETDEWEB)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  6. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    Energy Technology Data Exchange (ETDEWEB)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  7. Medicare Part D: Pharmacists and formularies--whose job is it to address copays?

    Science.gov (United States)

    Khan, Shamima

    2014-09-01

    To explore pharmacists' perceived responsibility to assist Part D patients in the community in managing their out-of-pocket (OOP) costs as well as pharmacists' overall experience with Medicare Part D. Cross-sectional analysis. Maine, New Jersey, New York, Massachusetts, Maryland, and Pennsylvania. 272 pharmacists. 37-question online survey. Perceived responsibility to assist Part D patients in managing their OOP costs and pharmacists' overall experience with Medicare Part D. Of the 4,888 online surveys, 1,108 were assumed to have reached the intended recipients, of which 272 responded (adjusted response rate 25.0%). Fifty-seven percent, 43.3%, and 41.9% of pharmacists reported that it was not their responsibility to address Part D patients' copayment/cost issue, prior authorization issues, or dispense preferred formulary medications, respectively. However, 43.2% reported that their most time-consuming task in reference to Part D were addressing formulary and copayment issues. In reference to overall experience with Part D, 42.9% reported that the impact on pharmacy's workflow was negative or very negative. A significant difference was observed between pharmacists' practice settings, the state in which they practiced, and reporting of negative impact of Part D on workflow (χ² = 4.9, P = 0.028; χ² = 6.16, P = 0.013, respectively). Most community pharmacists reported that it was not their responsibility to address patients' OOP costs issues, though a majority reported that the most time-consuming task in reference to Part D was addressing formulary and copayment issues. Almost half of the pharmacists also reported that the impact of Part D on workflow was negative.

  8. Idea-Generation Techniques: A Formulary of Active Ingredients.

    Science.gov (United States)

    Smith, Gerald F.

    1998-01-01

    Reports the results of a study of active ingredients of creativity techniques, devices that promote idea generation, through an analysis of 172 idea-generation methods which identified three types of idea-generation devices--strategies, tactics, and enablers. These devices were organized into meaningful categories comprising a formulary of active…

  9. South African Medicines Formulary Baragwanath Hospital. 50 Years ...

    African Journals Online (AJOL)

    I saw him for the last time on 11 December 1994. The three of us went out to lunch which we all enjoyed. I said adieu to Sheila and Ben, little realising that it was goodbye. Our condolences go to his family. May peace come to them leaving only the memories of this great man. Books. South African Medicines Formulary.

  10. Communicating Risk to Program Managers

    Science.gov (United States)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  11. Environmental Management Science Program Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  12. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  13. Transit management certificate program.

    Science.gov (United States)

    2012-07-01

    TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...

  14. Pain Management Programs

    Science.gov (United States)

    ... mission The program is patient and family centered Work together for common, agreed upon goals Develop treatment plans based on individual needs Mutual respect and open communication as a team Frequent communication between primary provider and team members ...

  15. Federal Energy Management Program Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-05

    Brochure offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  16. Aircrew team management program

    Science.gov (United States)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  17. A Program Management Framework for Facilities Managers

    Science.gov (United States)

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  18. [Drugs having latex and therapeutic alternatives in hospital formulary].

    Science.gov (United States)

    Damas Fuentes, Rosa María; Pérez León, Moisés; Piñero González, Marta; Sangil Monroy, Nayra; Molero Gómez, Rafael; Domínguez Lantigua, Pablo

    2015-01-01

    To analyze the latex content of drugs in hospital formulary and establish possible therapeutic alternatives. All drugs susceptible of having latex were selected and written information was obtained from manufacturers. A therapeutic alternative was found for each of them, if possible. Written information from manufacturer was obtained for 605 (97.9%) and from label information for 8 of 632 selected drugs. For 43.9% of not safe drugs (total 57) on patients with latex allergy, a therapeutic alternative was found in hospital formulary. Knowing drugs having latex improve the prescription security, while the therapeutic alternatives chart eases the validation. The published data updates the scarce and variable information for patients and healthcare professionals. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  19. Program and Project Management Framework

    Science.gov (United States)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  20. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  1. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  2. Space program management methods and tools

    CERN Document Server

    Spagnulo, Marcello; Balduccini, Mauro; Nasini, Federico

    2013-01-01

    Beginning with the basic elements that differentiate space programs from other management challenges, Space Program Management explains through theory and example of real programs from around the world, the philosophical and technical tools needed to successfully manage large, technically complex space programs both in the government and commercial environment. Chapters address both systems and configuration management, the management of risk, estimation, measurement and control of both funding and the program schedule, and the structure of the aerospace industry worldwide.

  3. Hazardous Materials Management Program Report- 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2005-06-01

    The annual program report provides detailed information about all aspects of the SNL/CA Hazardous Materials Management Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  4. The multidisciplinary concussion management program.

    Science.gov (United States)

    Panczykowski, David M; Pardini, Jamie E

    2014-01-01

    Over the past decade, research has increased scientific and public knowledge about the importance of identification and proper management of concussion. These concerns have prompted many state, regional, and private organizations to mandate the creation of, and strict adherence to, concussion management protocols, particularly with regard to sport-related concussion and subsequent return to play. Because of the individualized nature of the concussive injury and its recovery, a multidisciplinary approach provides comprehensive patient care that best addresses treatment and management of changing symptoms and their impact on multiple aspects of a patient's life and overall function. The current report will explore a model of multidisciplinary concussion management from program establishment and baseline testing to recovery from chronic postconcussion symptoms. © 2014 S. Karger AG, Basel.

  5. Program Management Officer | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Job Summary Working under the supervision of a manager, the Program Management Officer contributes to the operation of a research program, produces documentation, and coordinates and disseminates information in support of the program management. The principal responsibilities include knowledge management, ...

  6. Sport Management Graduate Programs: Characteristics of Effectiveness.

    Science.gov (United States)

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  7. Cybersecurity Challenges for Program Managers

    Science.gov (United States)

    2014-10-01

    lower overall program risk and lead to better acquisition outcomes. The revised DoDI 8510.01, Risk Management Framework ( RMF ) for DoD IT, is DoD’s...Assurance Certification and Accreditation Process (DIA- CAP). The focus of RMF is on iteratively managing cyberse- curity risk through a six-step process...Target stores was the biggest in U.S. history and primarily was due to lack of continuous monitoring and response. RMF uses a risk-based approach for

  8. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  9. Managing Capacity Through Reward Programs

    OpenAIRE

    Byung-Do Kim; Mengze Shi; Kannan Srinivasan

    2004-01-01

    Rewarding customers with own products or services has become an increasingly popular practice across a spectrum of industries such as airlines, hotels, and telecommunication. In these service industries, firms face demand uncertainty and strict short-term capacity constraint. When the market demand is low, firms hold excess capacities that would lead to intense price competition. In this paper we study the adoption and design of reward programs in the context of capacity management. We demons...

  10. An Annual Formulary Review Strategy Implemented by a Saudi Health System

    OpenAIRE

    Esba, Laila Carolina Abu

    2016-01-01

    As in the U.S., there is no unified national formulary in Saudi Arabia, so individual institutions must develop their own medication lists. A Saudi health system’s strategy for maintaining formulary safety, efficacy, and cost-effectiveness is described.

  11. Formulary systems and pharmacy and therapeutics committees in the Western Pacific Region: exploring two Basel Statements.

    Science.gov (United States)

    Penm, Jonathan; Chaar, Betty; Dechun, Jiang; Moles, Rebekah

    2013-06-01

    The use of formulary systems and pharmacy and therapeutics (P&T) committees in the Western Pacific Region (WPR) and the factors associated with their use were explored. Minor additions were made to a previously validated survey and reviewed by a WPR advisory committee. The Basel Statements 26 and 27 survey was made available in eight languages and sent electronically to 1989 hospital pharmacy directors through respective hospital pharmacy associations in the WPR. A total of 797 responses (40%) from 34 nations were received. Of these responses, 87% of hospitals (691 of 797) used a formulary. Also, 93% of respondents (619 of 664) indicated that their hospital had a P&T committee. However, only 44% of respondents (274 of 626) reported that more than half of their formulary medicines were linked to standard treatment guidelines. Furthermore, only 41% of hospitals (247 of 601) had a policy for off-label medication use. The pharmacy directors' perceived benefits of formularies were correlated with having more formulary medicines linked to standard treatment guidelines, basing their use on the best available evidence, and having a policy for the use of off-label medicines. A large proportion of hospitals in the WPR have implemented formularies and P&T committees. Although formularies are commonly used, their effectiveness may be limited, as formularies are often not linked to standard treatment guidelines or the best available evidence.

  12. Do educational meetings and group detailing change adherence to drug formularies in hospitals?

    DEFF Research Database (Denmark)

    Plet, Hanne T; Kjeldsen, Lene J.; Christensen, René dePont

    2014-01-01

    The aim of this study was to examine whether educational meetings and group detailing could increase the use of drugs from the ward lists or the drug formulary in hospitals.......The aim of this study was to examine whether educational meetings and group detailing could increase the use of drugs from the ward lists or the drug formulary in hospitals....

  13. Home audit program: management manual

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  14. 30 CFR 401.12 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal year's...

  15. 10 CFR 800.002 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE General § 800.002 Program management. Program management responsibility for...

  16. 30 CFR 402.13 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 402.13 Section 402.13... WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or...

  17. 14 CFR 1214.1706 - Program management.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214... Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible for program management under the direction of the Committee chairperson. ...

  18. 20 CFR 638.800 - Program management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures sufficient...

  19. Hospitality Management. Florida Vocational Program Guide.

    Science.gov (United States)

    Florida State Univ., Tallahassee. Center for Instructional Development and Services.

    This program guide is intended for the implementation of a hospitality management program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, describes jobs under the program, and includes a curriculum framework and student performance standards for…

  20. 40 CFR 130.11 - Program management.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...

  1. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  2. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  3. The evolution of the cancer formulary review in Canada: Can centralization improve the use of economic evaluation?

    Science.gov (United States)

    Wranik, W Dominika; Gambold, Liesl; Hanson, Natasha; Levy, Adrian

    2017-04-01

    Public reimbursement of drugs is a costly proposition for health care systems. Decisions to add drugs to the public formulary are often guided by review processes and committees. The evolution of the formulary review process in Canada's publicly funded health system is characterized by increased centralization and systematization. In the past, the review of evidence and recommendation was conducted at the regional level, but was replaced with the pan-Canadian Oncology Drug Review in 2011. We assess the extent to which centralization and systematization of the review process have responded to past challenges, focusing on the use of economic evaluation in the process. Past challenges with economic evaluation experienced by regionalized review committees were identified from literature and qualitative data collected in the province of Nova Scotia. We categorize these using a typology with a macro-, meso, and micro-level hierarchy, which provides a useful framework for understanding at which level change is required, and who has the authority to influence change. Using grounded theory methods, we identify approaches used by Nova Scotia past committee members to compensate for perceived shortcomings of the process. These include an undue reliance on other committee members, on the multidisciplinarity of the committee, and on past decisions. Using a policy analysis approach, we argue that centralization and systematization of the review process only partially address the shortcomings of the previous regionalized process. Lessons from Canada can inform policy discussions across all health systems, where similar challenges with the formulary review process have been identified. © 2016 The Authors. The International Journal of Health Planning and Management published by John Wiley & Sons Ltd. © 2016 The Authors. The International Journal of Health Planning and Management published by John Wiley & Sons Ltd.

  4. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  5. Issues in NASA program and project management

    Science.gov (United States)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  6. Defense Acquisition University Program Managers Tool Kit

    Science.gov (United States)

    2011-01-01

    ORGANIZATION ...................................................................... 55–56 Program Office Organization Structures (Examples...C PM LEGEND: Engr—Engineering Log—Logistics Bus—Business DAU PROGRAM MANAGERS TOOL KIT 56 PROGRAM OFFICE ORGANIZATION STRUCTURES (Continued...the LOG CoP • Life Cycle Logistics Guidebook - Will be posted on the LOG CoP DAU PROGRAM MANAGERS TOOL KIT 55 “Pure” Product Structure PROGRAM OFFICE

  7. Evaluating and Selecting Sport Management Undergraduate Programs.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  8. Pricing strategies for combination pediatric vaccines based on the lowest overall cost formulary.

    Science.gov (United States)

    Behzad, Banafsheh; Jacobson, Sheldon H; Sewell, Edward C

    2012-10-01

    This paper analyzes pricing strategies for US pediatric combination vaccines by comparing the lowest overall cost formularies (i.e., formularies that have the lowest overall cost). Three pharmaceutical companies compete pairwise over the sale of monovalent and combination vaccines. Particular emphasis is placed on examining the price of Sanofi Pasteur's DTaP-IPV/HIb under different conditions. The main contribution of the paper is to provide the lowest overall cost formularies for different prices of DTaP-IPV/HIb and other Sanofi Pasteur vaccines. The resulting analysis shows that DTaP-IPV/HIb could have been more competitively priced compared with the combination vaccine DTaP-HepB-IPV, for federal contract prices in 2009, 2010 and 2011. This study also proposes the lowest overall cost formularies when shortages of monovalent vaccines occur.

  9. Material Management Program Can Attract Local Industry

    Science.gov (United States)

    Magad, Eugene L.

    1978-01-01

    Describes the material management certificate and the associate in applied science degree programs at William Rainey Harper College, Palatine, Illinois. Material management functions include purchasing, production control, inventory control, material handling, warehousing, packaging, computer applications, and transportation. (MF)

  10. Cost Management Competencies for Department of Defense Program Managers

    Science.gov (United States)

    1994-09-01

    Posner .................................................................................................... 22 Cadbury -Schweppes...Posner’s Problems and Skills .............................................................................. . 23 8. Cadbury -Schweppes Model...goals make organizational skills critical. Cadbury -Schweppes Cadbury -Schweppes conducted an extensive research program involving program manager

  11. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  12. Tapping into the Forest Management Assistance Programs

    Science.gov (United States)

    John L. Greene; Terry K. Haines

    1998-01-01

    Use of federal and state forest management assistance programs can enable nonindustial private forest owners to reduce their management expenses and practice better stewardship. This paper summarizes six federal and twelve state assistance programs available to owners in the North Central states. It also describes how to calculate the amount of a government...

  13. Developing Program Management Leadership for Acquisition Reform

    Science.gov (United States)

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  14. Modeling Imaginary Worlds: Version 4 of the AMCP Format for Formulary Submissions

    Directory of Open Access Journals (Sweden)

    Paul C Langley

    2016-07-01

    Full Text Available The question of demarcation between normal science and pseudoscience is critical to the discovery of new facts. The core elements supporting progress in science are: (i empirically evaluable coherent theories and (ii the testing of hypotheses through experimentation or systematic observation. If modeled or simulation-based claims for cost-effectiveness are to be accepted as a credible input to health care decision making than they must conform to these standards. Claims should be testable, falsifiable and replicable. If not then they are best seen as pseudoscience. This assessment of the latest version of the Academy of Managed Care Pharmacy (AMCP Format for Formulary Submissions (Version 4.0; April 2016 concludes that, in their recommendations for cost-effectiveness modeling, the proposed standards do not meet those of normal science. Rather, in common with previous versions of the AMCP Format, the modeling framework proposed not only puts to one side the issue of testable claims, but supports the modeling of imaginary worlds or thought experiments where claims are immune to falsification. In consequence, the payer or other recipient of a modeled or simulated claim that follows the AMCP Format has no idea, in the absence of observation or experimentation, whether the claim is right or even if it is wrong. The claims are potentially misleading, possibly harmful, but to an unknown extent. They have no place in evidence-based medicine. Conflict of Interest None Type: Commentary

  15. Compromise Programming in forest management

    Science.gov (United States)

    Boris A. Poff; Aregai Tecle; Daniel G. Neary; Brian Geils

    2010-01-01

    Multi-objective decision-making (MODM) is an appropriate approach for evaluating a forest management scenario involving multiple interests. Today's land managers must accommodate commercial as well as non-commercial objectives that may be expressed quantitatively and/or qualitatively, and respond to social, political, economic and cultural changes. The spatial and...

  16. Interdisciplinary Programs Focused Populations: The Case of Health Management Program

    Science.gov (United States)

    Davidovitch, Nitza; Yavich, Roman

    2015-01-01

    The Ariel University has a unique interdisciplinary program in healthcare management that targets experienced healthcare professionals who wish to earn an academic degree. Only one academic study has been held so far on the integration of graduates of an academic university-level school in healthcare management in the field. In the current study,…

  17. Managing Air Quality - Program Implementation

    Science.gov (United States)

    Describes elements for the set of activities to ensure that control strategies are put into effect and that air quality goals and standards are fulfilled, permitting programs, and additional resources related to implementation under the Clean Air Act.

  18. Economic value evaluation in disease management programs.

    Science.gov (United States)

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  19. Regional Traffic Incident Management Programs : implementation guide

    Science.gov (United States)

    2000-11-01

    The purpose of this document is to assist organizations and their leaders in implementing and sustaining regional traffic incident management programs, both by examining some successful models, and by considering some of the lessons learned by early ...

  20. Data warehousing in disease management programs.

    Science.gov (United States)

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  1. Stillwater Wildlife Management Area Annual Water Management Program [1976

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Water Management Program summarizes last year's water receipts, distribution, and general marsh conditions. Using past records of waterfowl use and productivity...

  2. Stillwater Wildlife Management Area Annual Water management Program [1974

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Water Management Program summarizes last year's -water receipts, distribution and general marsh conditions . Anticipated water flows are made from cooperative...

  3. Environmental Management Science Program Workshop. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  4. Linear Programming Approach to Sustainable Management of ...

    African Journals Online (AJOL)

    A linear programming (LP) model was used to prescribe timber harvest in the management of even-aged Gmelina arborea plantations in Omo Forest Reserve, Southwestern, Nigeria. The plantations now being managed for timber production are to be exploited within fifteen years based on a 5-year harvesting period.

  5. Cryogenic fluid management program flight concept definition

    Science.gov (United States)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  6. Benchmarking Outdoor Expeditionary Program Risk Management Strategies

    Science.gov (United States)

    Meerts-Brandsma, Lisa; Furman, Nate; Sibthorp, Jim

    2017-01-01

    In 2003, the University of Utah and the National Outdoor Leadership School (NOLS) completed a study that developed a risk management taxonomy in the outdoor adventure industry and assessed how different outdoor expeditionary programs (OEPs) managed risk (Szolosi, Sibthorp, Paisley, & Gookin, 2003). By unifying the language around risk, the…

  7. Management Information System for ESD Program Offices.

    Science.gov (United States)

    1978-03-01

    Management Information System (MIS) functional requirements for the ESD Program Office are defined in terms of the Computer-Aided Design and Specification Tool. The development of the computer data base and a description of the MIS structure is included in the report. This report addresses management areas such as cost/budgeting, scheduling, tracking capabilities, and ECP

  8. UNBC: Outdoor Recreation and Tourism Management Program

    Science.gov (United States)

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  9. Issues in NASA program and project management

    Science.gov (United States)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  10. Computer-Aided Corrosion Program Management

    Science.gov (United States)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  11. Dermatological preparations for the tropics. A formulary of dermatological preparations and background information on choices, production and dispensing.

    NARCIS (Netherlands)

    Bakker, Peter; Woerdenbag, Herman; Gooskens, Vincent; Naafs, Ben; Kaaij, Rachel van der; Wieringa, Nicolien

    2012-01-01

    This book is a formulary describing 35 preparations covering the safe treatment of a broad range of skin diseases. The formulary focuses on effective and cheap preparations, suitable for local production and use under tropical conditions. If you want to use this book, you can either download it for

  12. Marketing the Masters of Executive Management program

    OpenAIRE

    Barrera, Mark A.; Karriker, Timothy W.

    2007-01-01

    MBA Professional Report The purpose of this MBA project was to review the current Masters of Executive Management education curriculum at NPS. An internal analysis of the current program was conducted to fully understand the strategic goals of the program and the existing curriculum. An environmental scan of current and potential military customers was conducted to assess requirements for junior executive education and determine whether the MEM program corresponds with these requiremen...

  13. A Natural Resources Management Program

    Science.gov (United States)

    Lancaster, George B.

    1977-01-01

    Three years of instruction in natural resources management (NRM) are offered at Louisa County High School, Mineral, Virginia, with 30 acres of land for use as outdoor classrooms. Instructional areas are grouped under forestry; crops and soils; and surveying, air, water, recreation, and general. Two years of basic agriculture science and mechanics…

  14. Program Manager’s Handbook

    Science.gov (United States)

    1989-03-01

    1! tion ckr cost effectiveness than is found in a CPFF "it"() 6: "vcq() iso P A -u ’ r: ’: u ,, fli,, contract. , mu ,r. , ,nM h ,1 . -Multiple...introducd to the knowledge and skills In accordance -with DCI1) 50001 )52. thil course in funds management necessarv for assumption i s mandatory for cont

  15. Managing a Library Binding Program.

    Science.gov (United States)

    Merrill-Oldham, Jan

    Library binding is one of the activities typically included in newly created preservation departments, but librarians continue to discover that transforming a traditional binding program into one that better meets preservation objectives requires considerable investment of time. This resource guide is intended to help libraries review their…

  16. Impact of a transition to more restrictive drug formulary on therapy discontinuation and medication adherence.

    Science.gov (United States)

    Shirneshan, E; Kyrychenko, P; Matlin, O S; Avila, J P; Brennan, T A; Shrank, W H

    2016-02-01

    There is conclusive evidence demonstrating that formulary restrictions are associated with reduced utilization and pharmacy spending of the restricted drugs. However, prior efforts to implement restrictive formularies have been associated with inconsistent rates of therapy discontinuation and mixed impacts on adherence to therapy. Also, the impact of transferring patients from an already restrictive formulary to a more aggressive model has not been previously examined. This study evaluated the impact of implementation of a more restrictive formulary on therapy disruption, adherence rates, pharmacy costs and generic utilization among patients with common chronic conditions. In 2014, CVS Health implemented Value Formulary (VF), a restrictive benefit design with the aim of reducing spending while preserving access to and adherence to essential therapy, was used. A retrospective cohort study was conducted to assess changes in therapy disruption rates, pharmacy costs and generic dispensing rate (GDR) (for continuers) and medication adherence (for initiators) following the implementation of VF. The study group was selected from members of three existing employer clients transitioned from standard formulary (SF) to VF on January 2014. The control population was a matched group of six employers with the same preperiod formulary structure, business unit, adherence programmes and patient out-of-pocket cost as the study group. The control group retained SF in 2014. To assess therapy disruption after VF implementation, we categorized patients by their subsequent medication use into three groups: (i) therapy stopped, (ii) therapy continued and (iii) therapy switched. Medication adherence was measured as monthly proportion of days covered (PDC). Pharmacy cost and GDR were measured per utilizer per month (PUPM). Rates of therapy disruption in study and control groups were compared using the chi-square test. Differences in monthly PDC between matched groups were evaluated using

  17. Program Manager Assessments: Professionalism Personified

    Science.gov (United States)

    2015-08-01

    been successful, although I expect I have caused some people to worry. The results, from my perspective at least, have been terrific. I’m still... expected that. What I hadn’t expected , but probably should have, was the window these documents provide into the many complex challenges our PMs...corrective actions, I would prefer less drama in our programs and less need for corrective action in the first place. Like many of our PMs, this one

  18. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Science.gov (United States)

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  19. Organization and management of space grant programs

    Science.gov (United States)

    Sheppard, Sallie; Nichols, Steve

    1990-01-01

    The 21 Space Grant Programs represent a broad range of organizational structures which operate programs ranging in size from single university organizations to organizations including up to 41 members involving a composite of industrial organizations such as state agencies, and universities. Some of the space grant awards were made to organizations already in existence with on-going programs while other awards were made to consortia newly formed for the purpose of applying to the Space Grant Program. The workshop on organization and management of Space Grant Programs provided an opportunity for directors and program representatives to discuss and compare the relative advantages and disadvantages of the various models being used. This paper offers examples of the diversity of organizations, summarizes the common concerns to be met by each organizational model, and provides a case study of the Texas Space Grant Consortium organization.

  20. The Formularies of Unity and the Dutch Reformed Church: A preliminary survey

    Directory of Open Access Journals (Sweden)

    R. M. Britz

    1993-06-01

    Full Text Available This article undertakes a survey of the application of the Formularies of Unity by the Dutch Reformed Church, covering its history from the 18th century to approximately 1935. Although these Formularies were the accepted confessional basis of the church, it did not prevent additional theological accommodation during the 18th century. During the first part of the 19th century an institutional concept of the church put forward a subscribing formula. The confession became important. In principle the way was opened for an institutional and contractual enforcement of the Formu­laries. This happened when the church was involved in the wide-ranging li­beral struggle during the sixth decade. Even before the 20th century a new approach in which the role of the Formularies was seen more dogmatically and confessionalistically came to the fore. And, when the church was once again entangled in a struggle (viz. the well-known 'Du Plessis case' of the 1930's the dogmatic point of departure played into the hands of a con­fessional fundamentalism. In the history of the Dutch Reformed Church, the Formularies thus gained in ecclesiological emphasis and value and its application was conditioned by the context and theological influence. Most importantly, the underlying problem of its historicity on the one hand, and its scriptural context and intent on the other hand, remained an unpaid account.

  1. 76 FR 50720 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2011-08-16

    ... Theater, 701 Pennsylvania Avenue, NW., Washington, DC 20004. FOR FURTHER INFORMATION CONTACT: Mr. William... and Therapeutics Committee, regarding the Uniform Formulary. Meeting Agenda 1. Sign-In. 2. Welcome and.... Seating is limited and will be provided only to the first 220 people signing-in. All persons must sign-in...

  2. 77 FR 34356 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2012-06-11

    ... Theater, 701 Pennsylvania Avenue, NW., Washington, DC 20004. FOR FURTHER INFORMATION CONTACT: CDR Joseph..., regarding the Uniform Formulary. Meeting Agenda 1. Sign-In. 2. Welcome and Opening Remarks. 3. Public... first 220 people signing-in. All persons must sign-in legibly. Administrative Work Meeting: Prior to the...

  3. 77 FR 71178 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2012-11-29

    ... Center Theater, 701 Pennsylvania Avenue, NW., Washington, DC 20004. FOR FURTHER INFORMATION CONTACT: CDR..., regarding the Uniform Formulary. Meeting Agenda 1. Sign-In 2. Welcome and Opening Remarks 3. Public Citizen... and will be provided only to the first 220 people signing-in. All persons must sign-in legibly...

  4. 78 FR 74120 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2013-12-10

    ..., January 9, 2014, from 9:00 a.m. to 1:00 p.m. ADDRESSES: Naval Heritage Center Theater, 701 Pennsylvania... Pharmacy and Therapeutics Committee, regarding the Uniform Formulary. Meeting Agenda 1. Sign-In 2. Welcome... people signing-in. All persons must sign-in legibly. Administrative Work Meeting: Prior to the public...

  5. 78 FR 50049 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2013-08-16

    ... Theater, 701 Pennsylvania Avenue NW., Washington, DC 20004. FOR FURTHER INFORMATION CONTACT: CDR Joseph..., regarding the Uniform Formulary. Meeting Agenda: 1. Sign-In 2. Welcome and Opening Remarks 3. Public Citizen.... Seating is limited and will be provided only to the first 220 people signing-in. All persons must sign-in...

  6. 77 FR 50088 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2012-08-20

    ...: Naval Heritage Center Theater, 701 Pennsylvania Avenue, NW., Washington, DC 20004. FOR FURTHER... Pharmacy and Therapeutics Committee, regarding the Uniform Formulary. Meeting Agenda: 1. Sign-In. 2... and will be provided only to the first 220 people signing-in. All persons must sign-in legibly...

  7. 75 FR 10789 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2010-03-09

    .... ADDRESSES: The meeting will be held at the Naval Heritage Center Theater, 701 Pennsylvania Avenue, NW... Formulary. Meeting Agenda Sign-In; Welcome and Opening Remarks; Public Citizen Comments; Scheduled... and will be provided only to the first 220 people signing in. All persons must sign in legibly...

  8. 77 FR 14769 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2012-03-13

    .... to 1 p.m. ADDRESSES: Naval Heritage Center Theater, 701 Pennsylvania Avenue NW., Washington, DC 20004... Formulary. Meeting Agenda 1. Sign-In. 2. Welcome and Opening Remarks. 3. Public Citizen Comments. 4... provided only to the first 220 people signing-in. All persons must sign-in legibly. Administrative Work...

  9. 75 FR 79344 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2010-12-20

    ... Heritage Center Theater, 701 Pennsylvania Avenue, NW., Washington, DC 20004. FOR FURTHER INFORMATION..., by the Pharmacy and Therapeutics Committee regarding the Uniform Formulary. Meeting Agenda: 1. Sign... only to the first 220 people signing-in. All persons must sign-in legibly. Administrative Work Meeting...

  10. 75 FR 30003 - Federal Advisory Committee; Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2010-05-28

    ... to the public. ADDRESSES: The meeting will be held at the Naval Heritage Center Theater, 701... regarding the Uniform Formulary. Meeting Agenda Sign-In; Welcome and Opening Remarks; Public Citizen.... All persons must sign in legibly. Administrative Work Meeting Prior to the public meeting the Panel...

  11. 75 FR 51984 - Federal Advisory Committee; Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2010-08-24

    ....m. ADDRESSES: The meetings will be held at the Naval Heritage Center Theater, 701 Pennsylvania... regarding the Uniform Formulary. Meeting Agenda Sign-In; Welcome and Opening Remarks; Public Citizen... first 220 people signing in. All persons must sign in legibly. Administrative Work Meeting Prior to the...

  12. The Marshall Islands Data Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  13. Pediatric CT quality management and improvement program

    Energy Technology Data Exchange (ETDEWEB)

    Larson, David B.; Chan, Frandics P.; Newman, Beverley; Fleischmann, Dominik [Stanford University School of Medicine, Department of Radiology, Stanford, CA (United States); Molvin, Lior Z. [Stanford Hospital and Clinics, Stanford, CA (United States); Wang, Jia [Stanford University, Environmental Health and Safety, Stanford, CA (United States)

    2014-10-15

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve. (orig.)

  14. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-10-21

    ... Federal Highway Administration Multistate Corridor Operations and Management Program AGENCY: Federal... Operations and Management (MCOM) Program authorized by the Safe, Accountable, Flexible, Efficient... transportation challenges facing the efficient and effective operation and management of transportation...

  15. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Science.gov (United States)

    2010-05-28

    ... Terrorism Risk Insurance Program; Litigation Management Submissions AGENCY: Departmental Offices. ACTION..., the Terrorism Risk Insurance Program Office is seeking comments regarding Litigation Management..., preferably an original and two copies) to: Terrorism Risk Insurance Program, Public Comment Record, Suite...

  16. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  17. Sandia National Laboratories, California Waste Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  18. Marketing the Masters of Executive Management Program

    Science.gov (United States)

    2007-12-01

    utilized this example of product differentiation to capture a target market by restructuring their current model line up to include the new four door...managed using a product differentiation strategy to minimize the risks of cannibalization from its 18-month MBA program (Moses, 2005a). Discussion

  19. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to: (i...

  20. Next Generation Leadership Improving Acquisition Program Management Development

    Science.gov (United States)

    2013-02-14

    TE AIR WAR COLLEGE AIR UNIVERSITY NEXT GENERATION LEADERSHIP IMPROVING ACQUISITION PROGRAM MANAGEMENT DEVELOPMENT by Jeffrey C. Sobel, Lt...strengths and weaknesses in the current Air Force acquisition leader development process. To improve program manager training, this paper recommends...the existing Air Force Mentorship Program to ensure young program managers are matched with experienced senior leaders . Mentor/Teach requires

  1. 76 FR 47296 - Transit Asset Management (TAM) Pilot Program Funds

    Science.gov (United States)

    2011-08-04

    ... Federal Transit Administration Transit Asset Management (TAM) Pilot Program Funds AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Transit Asset Management Pilot Program Announcement of Project Selections... the Transit Asset Management (TAM) Pilot Program, which was announced in the TAM Program Notice of...

  2. A Comparison of Government and Industry Program Manager Competencies

    Science.gov (United States)

    2014-04-30

    number of key shortfalls in both technical and leadership / management skills. The results of this study may be useful in suggesting program management ...large, complex programs using a project management paradigm and structure with a civilian or military program manager leading a team of government...and industry program managers must be technically competent, demonstrate key business competencies, and exercise leadership in executing the large

  3. Increased Moxifloxacin Utilization Associated with an Unrestricted Addition to a Drug Reimbursement Formulary: A Population-Based Analysis

    Directory of Open Access Journals (Sweden)

    Alissa Jade Wright

    2014-01-01

    Full Text Available OBJECTIVES:To determine whether utilization of moxifloxacin, a broad-spectrum fluoroquinolone antibiotic, has changed since its addition to the British Columbia provincial formulary in 2009 and to determine whether utilization was guideline concordant.

  4. Utilizing three years of epidemiological data from medical missions in Cambodia to shape the mobile medical clinic formulary

    National Research Council Canada - National Science Library

    Jeany Kim Jun; Junia S Koo; Amy Y Kang; Deborah B Chien; Albert Shim; Dale Knutson; Eda M Kim

    2017-01-01

    Objective: The purpose of this project was to gather epidemiological data on common diseases and medications dispensed during medical mission trips to Cambodia to shape the mobile medical clinic formulary. Methods...

  5. The evolution of the cancer formulary review in Canada: Can centralization improve the use of economic evaluation?

    OpenAIRE

    Wranik, W. Dominika; Gambold, Liesl; Hanson, Natasha; Levy, Adrian

    2016-01-01

    Summary Public reimbursement of drugs is a costly proposition for health care systems. Decisions to add drugs to the public formulary are often guided by review processes and committees. The evolution of the formulary review process in Canada's publicly funded health system is characterized by increased centralization and systematization. In the past, the review of evidence and recommendation was conducted at the regional level, but was replaced with the pan?Canadian Oncology Drug Review in 2...

  6. The Power and Politics of Program Management

    Science.gov (United States)

    2010-04-01

    book on leadership , aptly (if not imaginatively) entitled Leadership , Peter Northouse defines leadership as the “process whereby an individual...and its ap- plication to leadership and man- agement has gotten a bad repu- tation. Unhelpful terms such as power hungry, abuse of power, and...sential to the leader. Examples from program management will be used to illustrate throughout. Power: The Motive Force of Leadership In his seminal

  7. 1998 Environmental Management Science Program Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-03-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

  8. [Collation and research on the different texts in Qian jin yao fang (Precious essential formulary, PEF)].

    Science.gov (United States)

    Lin, Nan; Wang, Lizi

    2002-04-01

    There is considerable difference in the texts between PEF and the archaic editions Sun zhen ren qian jin fang (The Immortal Sun's Precious Formulary, ISPF) and the Song - revised edition Bei ji qian jin yao fang (Precious Essential Formulary for Emergency, PEFE). It is hoped that the real features of PEF can be worked out through collated studies on these two editions so as to offer a basis for systematic research on PEF. At the same time, it has been proved that during the revision and collation of PEF by the Song scholars, it is certain that dramatic revisions had been made on its medical materials, especially an abundant amount of medical materials were added. As a result, the current circulated edition of PEFE does have obvious differences with Sun's original work, while ISPF, in contrast, preserves the original features of Sun Simiao. Hence, ISPF is of important academic significance in the in - depth study of PEF.

  9. An integrated scheduling and program management system

    Science.gov (United States)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  10. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  11. Experience with a drug formulary in a large Italian city hospital.

    Science.gov (United States)

    Zaccara, A; Sirtori, C R; Marchesi, F

    1989-01-01

    The preparation and distribution of a drug formulary, providing some 377 pharmacological entities together with significant general information, in a large city hospital, enabled the collection of data on the pattern of drug use in this setting. Out of the 377 selected drugs, 27 were never used in the course of one year: most notable among these were the cephalosporin cephalothin, the antifungal griseofulvin, piperazine and the leading anti-H1-blocker terfenadine. Thirteen pharmaceutical preparations were used in over 50,000 doses; among these were the amiloride + hydrochlorothiazide combination, co-trimoxazole and lorazepam. Examination of specific drug series, e.g. of cephalosporins, showed a clear preference for the longer acting ceftriaxone versus a minor use for oral agents, e.g. cefadroxil. There was a wide choice of cardiovascular agents and a relative stability in the preference for major and minor antipsychotics. Outside of the formulary list, only a small number of preparations were requested, among these some traditional analgesic combinations and some extractive products. The provision of a hospital formulary may, in some way, modify drug choice in the hospital, although some established patterns of use are difficult to change. On the other hand, some interesting information was provided on the criteria of choice of hospital physicians.

  12. Managing biotechnology in a network-model health plan: a U.S. private payer perspective.

    Science.gov (United States)

    Watkins, John B; Choudhury, Sanchita Roy; Wong, Ed; Sullivan, Sean D

    2006-01-01

    Emerging biotechnology poses challenges to payers, including access, coverage, reimbursement, patient selection, and affordability. Premera Blue Cross, a private regional health plan, developed an integrated cross-functional approach to managing biologics, built around a robust formulary process that is fast, flexible, fair, and transparent to stakeholders. Results are monitored by cost and use reporting from merged pharmacy and medical claims. Utilization management and case management strategies will integrate with specialty pharmacy programs to improve outcomes and cost-effectiveness. Creative approaches to provider reimbursement can align providers' incentives with those of the plan. Redesign of member benefits can also encourage appropriate use of biotechnology.

  13. University Program Management Information System: NASA's University Program Active Projects

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  14. Project management in the Apollo program: An interdisciplinary study

    Science.gov (United States)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  15. Desertification risk assessment and management program

    Directory of Open Access Journals (Sweden)

    M. Akbari

    2016-12-01

    Full Text Available Risk assessment provides the possibility of planning and management to prevent and reduce the risk of desertification. The present study is aimed to assess the hazard and risk of desertification and to develop management programs in the semi-arid western regions of Golestan Province in Iran. Desertification rate was obtained using the Iranian model of desertification potential assessment. Since the rating system was considered for the indicators, data analyses were carried out according to the Mann-Whitney test. The risk of desertification was calculated based on hazard, elements at risk and vulnerability assessment maps. The intensity of desertification was estimated to be medium. Among the factors affecting desertification, agriculture by the weighted average of 3.22 had the highest effect, followed by soil, vegetation, water and wind erosion criteria by weighted averages of 2.45, 2.32, 2.15 and 1.6 respectively. Desertification risk assessment results also showed that about 78% of central and northern parts of the region, with the largest population and residential centers, surface and underground water resources, agriculture and horticulture, is confronted with a high to very high degree of risk. Management plans and control measures, based on risk values were presented in four activities (with two management priorities under critical and non-critical conditions. For the management program with the largest area. Control measures and strategies such as the establishment of halophytic and xerophytic plants, drainage networks, resilient facilities and infrastructure were proposed. Reducing the risk of desertification, could play a crucial role in the sustainable development of drylands and desert ecosystems.

  16. NASA University Program Management Information System

    Science.gov (United States)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  17. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  18. The role of the case manager in a disease management program.

    Science.gov (United States)

    Huston, Carol J

    2002-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  19. 20 CFR 632.76 - Program management systems.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... management systems. (a) All Native American grantees shall establish management information systems to... for the overall management of all programs including: (1) Eligibility verification systems as...

  20. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  1. Configuration Management for eXtreme Programming

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred; Ekman, T.

    2003-01-01

    ) techniques. We report on our experience in providing many groups of novice developers with CM education, processes and tools to support the four CM-related XP practices in their projects. True to the spirit of XP both education and processes are very lightweight and we found that it was sufficient to focus......Extreme programming (XP) is a software development method that prescribes the use of 12 different practices. Four of these practices (collective code ownership, continuous integration, small releases and refactoring) can indeed be given good support by the use of simple configuration management (CM...

  2. Program Manager, Volume 21, Number 5, September-October 1992

    Science.gov (United States)

    1992-10-01

    Management " originally stressed thinking about the forces that affect not simply at the most senior layers by Henry Fayol . Although manage - the destiny of...following the same principles that analytical ability, memory and judg- Program Manager 31 September-October 1992 ment, but strong interpersonal skills...34September-October 1992 PROGRAM%J MANAGER im Journal of the Defense Systems Management College Bar Code Management The Acquisition Officer at War

  3. The Ruby Red Slipper Program: an interdisciplinary fall management program in a community academic medical center.

    Science.gov (United States)

    Wexler, Sharon Stahl; D'Amico, Catherine O'Neill; Foster, Norma; Cataldo, Karen A; Brody, Patricia; Huang, Zheng-Bo

    2011-01-01

    Falls are a common, yet serious complication for hospitalized patients. The Ruby Red Slipper Program is an interdisciplinary fall management program that includes development and education of unit-based fall management teams. Initial outcomes demonstrated significant reductions in falls.

  4. Effectiveness of a Dental Students Stress Management Program

    OpenAIRE

    Alzahem, Abdullah M; Van Der Molen, Henk T.; De Boer, Benjamin J

    2015-01-01

    The dental education stress effects and sources were explored thoroughly in the literature, but the effectiveness of stress management programs received less attention. This study introduced a new stress management program, named Dental Education Stress Management (DESM) program. It showed its effectiveness in a quasi-experimental pretest-posttest-follow-up-control group design. The new program was based on the principle of psychoeducation and consisted of three 90-min sessions, to teach dent...

  5. Farm Business and Production Management Program Course Competency Record.

    Science.gov (United States)

    Madison Area Technical Coll., WI.

    This course competency record is intended to help teachers rate development of student competencies in a farm business and production management program. Competencies are listed for six courses: operating the farm business, soil management, crop management, livestock nutrition, livestock management/farmstead equipment management, and farm records…

  6. Development and Implementation of a Program Management Maturity Model

    Energy Technology Data Exchange (ETDEWEB)

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  7. Supporting Formulary Decisions: The Discovery of New Facts or Constructed Evidence?

    Directory of Open Access Journals (Sweden)

    Paul C Langley

    2016-07-01

    Full Text Available A critical question, given the growing importance of more targeted therapies to support personalized and precision medicine, is the credibility of the evidence base to support formulary decisions and pricing. On the one hand, for those who subscribe to the reference case model of the National Institute of Health and Care Excellence (NICE in the UK, the decision rests upon the creation of modeled or simulated imaginary worlds and the application of threshold willingness-to-pay cost-per-QALY thresholds. On the other hand, for those who subscribe to the standards of normal science, the decision rests upon the ability to evaluate competing claims, both clinical and cost-effective, in a timeframe that is meaningful to a formulary committee. If we subscribe to the scientific method where the focus is on the discovery of new facts, untestable claims for clinical benefit and cost-effectiveness, such as created claims for lifetime cost per-quality-adjusted discounted life years (QALYs, are properly relegated to the category of pseudoscience. We have no idea, and will never know, whether the claims are right or even if they are wrong. If formulary decisions are to respect the standards of normal science then there has to be a commitment to claims evaluation. A willingness to accept new products provisionally, subject to an agreed protocol to support the evaluation of clinical and cost-effectiveness claims. This dichotomy between the standards of normal science and pseudoscience is explored in the context of published claims for cost-effectiveness and recommendations for product pricing in the US.   Type: Commentary

  8. SELF MANAGEMENT PROGRAM MENINGKATKAN KOPING, NIAT DAN KEPATUHAN BEROBAT PASIEN PJK SETELAH PEMBERIAN SELF MANAGEMENT PROGRAM

    Directory of Open Access Journals (Sweden)

    Hanim mufarokhah mufarokhah

    2016-04-01

    Full Text Available Introduction: Management coronary artery disease required lifelong treatment. The successful management of CHD requires efective coping, intention and medication adherence of CHD’s patients. This study aimed to explain the changes of coping, intention, and medication adherence in patients with CHD after giving self management programme in RSUD Jombang based on Theory Planned Behavior.Method: This study used a quasy experimental pretest-posttest control group design and 28 respondens selected by consecutive sampling. Independent variable was self management programme while dependent variables were coping, intention, medication adherence. Data were collected by using questonnaires measuring coping level, intention and medication adherence. The statistical test used was Mann Whitney, Wilcoxone Signed Rank and t-Test. Result: The result showed that 1 self management programme improve the level of coping in patients with CHD (p < 0,001, 2 self management programme improve the level of intention in patients with CHD (p < 0,001, 3 self management programme improve the level of medication adherence in patients with CHD (p < 0,001. Discussion: To change a behavior requires improvement of coping and intentions. This is in according to the Theory of Planned Behavior that behavior change is influenced by the attitude toward the behavior, subjective norm, perceived behavioral control and intention. Keywords: self management program, coping, intention, medication adherence, coronary heart disease

  9. 75 FR 68418 - Real-Time System Management Information Program

    Science.gov (United States)

    2010-11-08

    ... Federal Highway Administration 23 CFR Part 511 RIN 2125-AF19 Real-Time System Management Information... System Management Information Program that provides, in all States, the capability to monitor, in real... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  10. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    Science.gov (United States)

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  11. 75 FR 16623 - Emergency Management for Higher Education Grant Program

    Science.gov (United States)

    2010-04-01

    ... Education Emergency Management for Higher Education Grant Program; Notices #0;#0;Federal Register / Vol. 75... Higher Education Grant Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.184T. AGENCY... requirements for the Emergency Management for Higher Education (EMHE) grant program. The Assistant Deputy...

  12. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  13. Sandia National Laboratories, California Environmental Management System program manual

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  14. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  15. A Cognitive Stress Reduction Program for Recently Unemployed Managers.

    Science.gov (United States)

    Saam, Robert H.; And Others

    1995-01-01

    Examined effectiveness of a structured cognitive stress reduction program for unemployed managers (n=42) involved in an outplacement program. Using a control group design, managers who were assigned to cognitively based stress reduction program found reemployment significantly sooner and showed reductions in levels of state anxiety and anger that…

  16. National Drug Formulary review of statin therapeutic group using the multiattribute scoring tool

    Directory of Open Access Journals (Sweden)

    Ramli A

    2013-12-01

    Full Text Available Azuana Ramli,1,3 Syed Mohamed Aljunid,1,2 Saperi Sulong,2 Faridah Aryani Md Yusof31United Nations University International Institute for Global Health (UNU-IIGH, Kuala Lumpur, Malaysia; 2International Centre for Casemix and Clinical Coding (ITCC, Universiti Kebangsaan Malaysia Medical Centre, Kuala Lumpur, Malaysia; 3Pharmaceutical Services Division, Ministry of Health, Petaling Jaya, MalaysiaPurpose: HMG-CoA reductase inhibitors (statins are extensively used in treating hypercholesterolemia. The statins available in Malaysia include atorvastatin, lovastatin, pravastatin, rosuvastatin, simvastatin, and fluvastatin. Over the years, they have accumulated in the National Drug Formulary; hence, the need for review. Effective selection of the best drugs to remain in the formulary can become complex due to the multiple drug attributes involved, and is made worse by the limited time and resources available. The multiattribute scoring tool (MAST systematizes the evaluation of the drug attributes to facilitate the drug selection process. In this study, a MAST framework was developed to rank the statins based on their utilities or benefits.Methods: Published literature on multicriteria decision analysis (MCDA were studied and five sessions of expert group discussions were conducted to build the MAST framework and to review the evidence. The attributes identified and selected for analysis were efficacy (clinical efficacy, clinical endpoints, safety (drug interactions, serious side effects and documentation, drug applicability (drug strength/formulation, indications, dose frequency, side effects, food–drug interactions, and dose adjustments, and cost. The average weights assigned by the members for efficacy, safety, drug applicability and cost were 32.6%, 26.2%, 24.1%, and 17.1%, respectively. The utility values of the attributes were scored based on the published evidence or/and agreements during the group discussions. The attribute scores were added up

  17. Evaluation of angiotensin II receptor blockers for drug formulary using objective scoring analytical tool

    Directory of Open Access Journals (Sweden)

    Lim TM

    2012-09-01

    Full Text Available Drug selection methods with scores have been developed and used worldwide for formulary purposes. These tools focus on the way in which the products are differentiated from each other within the same therapeutic class. Scoring Analytical Tool (SAT is designed based on the same principle with score and is able to assist formulary committee members in evaluating drugs either to add or delete in a more structured, consistent and reproducible manner. Objective: To develop an objective SAT to facilitate evaluation of drug selection for formulary listing purposes. Methods: A cross-sectional survey was carried out. The proposed SAT was developed to evaluate the drugs according to pre-set criteria and sub-criteria that were matched to the diseases concerned and scores were then assigned based on their relative importance. The main criteria under consideration were safety, quality, cost and efficacy. All these were converted to questionnaires format. Data and information were collected through self-administered questionnaires that were distributed to medical doctors and specialists from the established public hospitals. A convenient sample of 167 doctors (specialists and non-specialists were taken from various disciplines in the outpatient clinics such as Medical, Nephrology and Cardiology units who prescribed ARBs hypertensive drugs to patients. They were given a duration of 4 weeks to answer the questionnaires at their convenience. One way ANOVA, Kruskal Wallis and post hoc comparison tests were carried out at alpha level 0.05. Results: Statistical analysis showed that the descending order of ARBs preference was Telmisartan or Irbesartan or Losartan, Valsartan or Candesartan, Olmesartan and lastly Eprosartan. The most cost saving ARBs for hypertension in public hospitals was Irbesartan. Conclusion: SAT is a tool which can be used to reduce the number of drugs and retained the most therapeutically appropriate drugs in the formulary, to determine most

  18. Managing PBL difficulties in an industrial engineering and management program

    Directory of Open Access Journals (Sweden)

    Anabela Alves

    2016-08-01

    Full Text Available Purpose: Project-Based Learning (PBL is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM, at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning

  19. Managing PBL difficulties in an industrial engineering and management program

    Energy Technology Data Exchange (ETDEWEB)

    Alves, A.; Sousa, R.; Moreira, F.; Carvalho, M.A.; Cardoso, E.; Pimenta, P.; Malheiro, T.; Brito, I.; Fernandes, S.; Mesquita, D.

    2016-07-01

    Project-Based Learning (PBL) is considered to be an active learning methodology which can be used to develop both technical and transversal competences in engineering programs. This methodology demands a great deal of work effort from the students and also from the teachers and it requires a meticulous plan and a well-managed project as well. These activities go far beyond the normal activities in traditional lectures, enabling to outpace the difficulties that spur along the way that may be both complex and demotivating. This methodology has been implemented in the Integrated Master Degree on Industrial Engineering and Management (IEM), at one public university in Portugal, since the 2004/2005 academic year. The aim of this paper is to identify and discuss the main difficulties of the implementation of PBL, mainly from the teachers’ perspectives. Additionally, some effective strategies will be recommended to overcome such difficulties. Design/methodology/approach: The perceptions of the teachers were collected through a survey based on six main themes. The participants in the study include eight teachers from the five courses of the first semester of the first year of the IEM program involved in the 2012/2013 and 2013/2014 editions. Findings: Integration of courses in the project; student assessment; growing number of students in each team and the need of physical spaces for them; and compartmentalized knowledge has emerged as the main difficulties. To overcome these difficulties some key strategies were recommended. Originality/value: A new perspective based on course teachers' views and experiences will deepen the understanding of the problems and provide inputs for the development of strategies that may improve the effectiveness of PBL and introduce changes for its successful implementation. These strategies are intended to be transferable to other contexts, as most of the problems and constraints are common to other active learning approaches. (Author)

  20. A case study of the Advanced Amphibious Assault Vehicle (AAAV) program from a program management perspective

    OpenAIRE

    Adams, Scott R.

    1999-01-01

    This research effort focused on the program management issues of the U.S. Marine Corps' Advanced Amphibious Assault Vehicle (AAAV) Program. The research answered the primary question of what were the critical program management decisions during the early phases of the program and how would an analysis of these decisions affect the future of the AAAV program. Interviews were conducted with key personnel from the AAAV office and General Dynamics Land Systems. Additionally, program documents and...

  1. Off-label drug use in pediatric anesthesia and intensive care according to official and pediatric reference formularies.

    Science.gov (United States)

    Doherty, Dermot R; Pascuet, Elena; Ni, Andy; Stewart, Paul; Splinter, William; Vaillancourt, Régis

    2010-12-01

    In pediatric practice, the official drug label often does not accurately reflect the contemporary use of many drugs prescribed to children. Therefore, clinicians frequently use contemporary drug references as a source of prescribing information instead of national formularies. The objective of this study was to compare drug prescriptions between two national formularies and two commonly used contemporary pediatric reference guidelines in the operating room/postanesthetic care unit (OR/PACU), pediatric intensive care unit (PICU), and neonatal intensive care unit (NICU). We performed a retrospective chart review of patients admitted over a one-month period to the NICU and PICU, and for one week during the same month, we reviewed charts of patients in the OR/PACU. The data collected included patients' demographic information, drugs prescribed, and dosage information. We assessed conformity with two national formularies, the Canadian Compendium of Pharmaceuticals and Specialties (CPS) and France's 2009 Dictionnaire Vidal (Vidal), and two contemporary pediatric references, the Hospital for Sick Children Handbook and Formulary and the Lexi-Comp Pediatric Dosage Handbook. Across the three clinical units, 59.7% (95% confidence interval [CI] 57.1-62.1%) of prescriptions were identified as being off-label, as defined by the CPS formulary. The odds of having an off-label prescription would have been substantially lower if the contemporary pediatric references (odds ratio [OR] = 0.074; 95% CI 0.065-0.084) or Vidal (OR = 0.70; 95% CI 0.63-0.77) had been used to define the label (both P < 0.001 compared with the CPS). Drugs are less likely to be off-label if prescribed according to a contemporary pediatric reference rather than according to national formularies. Methodologies used to compile contemporary references might serve as templates to inform a drug's official label.

  2. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Management contract between owner and program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT...

  3. Review of DoD’s Program Managers

    Science.gov (United States)

    2011-04-01

    DEFENSE BUSINESS BOARD Report to the Secretary of Defense Review of DoD’s Program Managers Report FY11-03...Recommendations for improving the effectiveness of military program managers based on private sector best practices. April 2011...2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Review of DoD’s Program Managers 5a. CONTRACT NUMBER 5b

  4. Lessons Learned from the Everglades Collaborative Adaptive Management Program

    Science.gov (United States)

    Recent technical papers explore whether adaptive management (AM) is useful for environmental management and restoration efforts and discuss the many challenges to overcome for successful implementation, especially for large-scale restoration programs (McLain and Lee 1996; Levine ...

  5. OVERVIEW OF THE INTRAMURAL RISK MANAGEMENT RESEARCH PROGRAM

    Science.gov (United States)

    This presentation will provide a summary of the risk management portion of ORD's endocrine disrupting chemicals (EDCs) research program, including its motivation, goals, planning efforts and resulting research areas.In an emerging research area like EDCs, risk management ...

  6. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  7. SNL/CA Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  8. Recommendations for improvements to program and project management

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  9. DC-10-10 winglet flight test program management

    Science.gov (United States)

    Agar, J. R.

    1982-01-01

    This paper discusses the McDonnell Douglas/NASA DC-10-10 winglet flight test program from a program management viewpoint. The program was conducted to obtain flight test data on the same airplane with and without winglets for direct comparison. As occasionally happens in flight tests, unexpected events occur. This program was encumbered by a low-speed buffet anomaly that required several configuration modifications before satisfactory performance could be attained. This paper relates the management techniques utilized to accommodate the unplanned increases in program scope and still complete the program on time and below the budgeted cost.

  10. 76 FR 72029 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2011-11-21

    ... Federal Highway Administration Multistate Corridor Operations and Management Program AGENCY: Federal... Corridor Operations and Management Program as authorized in 23 U.S.C. 511. This notice and correction... submission of proposals for that notice and request for applications. Applications should still be submitted...

  11. Sandia National Laboratories, California Chemical Management Program annual report.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  12. Increasing access and support for emergency management higher education programs.

    Science.gov (United States)

    Cwiak, Carol L

    2014-01-01

    The number of emergency management higher education programs has grown dramatically since 1994 when the FEMA Higher Education Program was created to propagate and support such growth. Data collected annually since 2007 from emergency management higher education programs shows that these programs face some consistent challenges. These challenges were coupled with annual data on program access and support indicators via dimensional analysis to answer the questions: To what extent are the challenges linked to a lack of access or support? If there is linkage, what can be gleaned from these linkages that can help address the challenges through improving access and support? The analysis showed that lack of access to funding and resources, and lack of support from partner organizations, has an impact on emergency management higher education. Discussion of that impact is followed with detailed recommendations that are focused on strengthening both internal and external access and support relationships for emergency management higher education programs.

  13. Skills Requirements of Engineering Program Managers.

    Science.gov (United States)

    Thamhain, Hans J.; Wilemon, David L.

    1979-01-01

    Discussed are the ten specific skills which have been identified with successful engineering management. These include: team building; leadership; conflict resolution; technical expertise; planning; organization; entrepreneurship; administration; management support; and resource allocation. (CS)

  14. Program Planning Concepts in Solid Waste Management

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  15. Gravel roads management : volume 3, gravel roads management : programming guide.

    Science.gov (United States)

    2010-10-01

    This report establishes procedures for managing dirt and gravel roads, with a primary focus on smaller agencies, such as Wyoming counties, that must manage their roads with very limited resources. The report strives, first, to guide and assist smalle...

  16. Assurance management program for the 30 Nova laser fusion project

    Energy Technology Data Exchange (ETDEWEB)

    Levy, A.J.

    1983-11-30

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project.

  17. Program Director Participation in a Leadership and Management Skills Fellowship and Characteristics of Program Quality

    National Research Council Canada - National Science Library

    Carek, Peter J; Mims, Lisa D; Conry, Colleen M; Maxwell, Lisa; Greenwood, Vicki; Pugno, Perry A

    2015-01-01

    The association between a residency program director completing a leadership and management skills fellowship and characteristics of quality and innovation of his/her residency program has not been...

  18. Health technology assessment of asthma disease management programs.

    Science.gov (United States)

    Steuten, Lotte; Lemmens, Karin; Vrijhoef, Bert

    2007-06-01

    To provide a critical opinion on the extent to which asthma disease management programs currently improve the effectiveness and efficiency of care and directions for future policy and research. The methodological quality of health technology assessment of asthma disease management programs remains moderate. Asthma disease management programs are predominantly educational and organizational in nature and focus either on children or on adults. Paediatric disease management programs make more effort to outreach into patients' living environments and show higher participation rates than those targeting adults. Reductions in asthma-related hospitalization, emergency department, and unplanned clinic visits range from 0 to 85%, 87% and 71%, respectively. Aspects of self-management and organization of care improved after the implementation of disease management programs. Almost no impact on asthma symptoms, lung function or the use of long-term control medication was found. There is accumulating 'circumstantial' evidence that disease management programs reduce resource utilization. The analytical rigor and uniformity of health technology assessment of asthma disease management programs has improved, but the generalizability of results remains uncertain. Practical, multicentre, clinical trials including broad representative study samples should be performed in different settings to increase methodological quality and substantiate current findings.

  19. Anger Management Program Participants Gain Behavioral Changes in Interpersonal Relationships

    Science.gov (United States)

    Pish, Suzanne; Clark-Jones, Teresa; Eschbach, Cheryl; Tiret, Holly

    2016-01-01

    RELAX: Alternatives to Anger is an educational anger management program that helps adults understand and manage anger, develop communication skills, manage stress, and make positive behavioral changes in their interpersonal relationships. A sample of 1,168 evaluation surveys were collected from RELAX: Alternatives to Anger participants over 3…

  20. Program Management Plan (PMP) for Rapid Runway Repair (RRR)

    Science.gov (United States)

    1983-04-15

    18 6 PROGRAM OFFICE ORGANIZATION CHART .................. 54 LIST OF TABLES Table Page 1 ESTIMATED RISK TO IMPROVE CAPABILITIES BY 1988...OPCer PROGRAM MANAGER F~ l "t U RPAC Figure 6. Program Office Organization Chart 54 data. The RRR Task Order Contract provides technical support and

  1. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  2. Adherence to hospital drug formularies and cost of drugs in hospitals in Denmark

    DEFF Research Database (Denmark)

    Plet, H. T.; Hallas, J.; Kjeldsen, L. J.

    2013-01-01

    PURPOSE: To investigate adherence rates to hospital drug formularies (HDFs) and cost of drugs in hospitals. METHODS: Data on drugs used during 2010 were analyzed for ten hospitals (two hospitals from each of the five regions), constituting 30 % of hospitals and 45 % of hospital beds in Denmark......, we also identified the drugs constituting 90 % of the volume (= DU90%) and the adherence to the HDF in this segment (Index of Adherence). RESULTS: Substances used by hospitals varied between 598 and 1,093. The proportion of used substances that were on the HDF varied between 14 % and 44 %. University....... Drug use data from individual hospitals were retrieved from the hospital pharmacies. Adherence to the HDFs was analyzed for selected substances characterised by extensive use both in primary and secondary sectors (ATC codes A10, B03, C03, C07, C08, C09, C10, J01, N02, N05 and R03). Within each group...

  3. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  4. Lessons learned from supporting a geohazard management program

    Energy Technology Data Exchange (ETDEWEB)

    Ripley, Neil; Simpson, Trevor; Leir, Mark [BGC Engineering, 500-1045 Howe St, Vancouver, BC (Canada)], email: nripley@bgcengineering.ca, email: tsimpson@bgcengineering.ca, email: mleir@bgcengineering.ca

    2010-07-01

    In a pipeline project, managing geotechnical, hydrotechnical and seismic hazard risks is of high importance. A field based systematic methodology, the geohazard management program, has been created to assist operators with the management of those risks. The purpose of this paper is to present this program from a geomatics perspective. Several geomatics tasks have to be completed under the program, from identifying potential hazards to setting up and supporting field navigation. To help the crews with those tasks, GIS and IT are used. In particular, Cambio is an internet database helping the management of geohazards by allowing access to the information from any site with the Internet. In addition, GIS analysis allows potential hazards to be identified. This paper showed the importance of geomatics support for identifying natural hazards and supporting field inspection missions for a pipeline Geohazard Management Program.

  5. Stillwater Wildlife Management Area : Annual Water Management Program : January 1, 1972 to December 31, 1972

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This 1972 Annual Water Management Program for the Stillwater Wildlife Management Area summarizes the water receipts, distribution, and marsh conditions attributed to...

  6. Stillwater Wildlife Management Area : Annual Water Management Program : January 1, 1973 to December 31, 1973

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This 1973 Annual Water Management Program for the Stillwater Wildlife Management Area summarizes the water receipts, distribution, and marsh conditions attributed to...

  7. A Study of Program Manager Effectiveness and Risk Taking Propensity

    Science.gov (United States)

    1988-09-01

    search for organizational effectiveness: a. Scientific Management - Taylor (1911). b. Principles of Management - Fayol (1916/1925). c. Human Relations... leadership . Management outcomes refer to the accomplishments of the organization or project team. This methodology is similiar to the model developed...C) W(IcFR Fl mp,’ II ~OF 4 A STUDY OF PROGRAM MANAGER EFFECTIVENESS AND RISK TAKING PROPENSITY THESIS Timothy P. McIntyre Captain, USAF AFIT/GSM/LSY

  8. Key Elements of Academic Programs Management Management of Postgraduate Virtual Courses at Universidad EAN

    Directory of Open Access Journals (Sweden)

    Gonzalo Benavides Gallego

    2015-12-01

    Full Text Available Rev.esc.adm.neg The main focus of this research study is the management of postgraduate academic programs offered at Univerdsidad EAN in virtual learning. The management processes applied to all types of organizations involve educational institutions. In such institutions, one of the principal actions of their management is to adminístrate academic programs, even though the focus of this study is postgraduate courses, specially the particular issues found in specialization courses and master degree programs base don virtual methodolgy, in which particular features and differences are described concerning the management of the academic programs offered having a face to face methodology.

  9. Waste Management Program. Technical progress report, October-December 1982

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  10. Everglades Collaborative Adaptive Management Program Progress

    Science.gov (United States)

    When the Comprehensive Everglades Restoration Plan (CERP) was authorized in 2000, adaptive management (AM) was recognized as a necessary tool to address uncertainty in achieving the broad goals and objectives for restoring a highly managed system. The Everglades covers18,000 squ...

  11. Environmental Program Management Tools for Federal Facilities

    Science.gov (United States)

    2010-06-17

    Reporting • FEDRPTS reporting tool – Helping Federal Agencies manage their environmental inventories and comply with environmental reporting... managemen t systems ( EMS) at all appropriate organizational levels to ensure : • use of EMS as t he primary management approach for addressing

  12. Program Management Officer -Think Tank Initiative | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... (i.e. research outputs, program level performance indicators) in Think Tank Initiative (TTI) systems and database; Prepares and coordinates program level documents such as (i.e. annual work plans, project information memoranda, communications strategies, evaluation plans, project reports or briefings, reports to donors, ...

  13. Management and Fragmentation of a Network Program

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg

    This paper contains an analysis of the role of identity in interorganizational collaboration. The case is a network program that involved three parties: eight companies, one consulting institution and a research institution. The purpose of the network program was to develop and test concepts...

  14. Hanford Site Groundwater Protection Management Program: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime, (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.

  15. Building a strategic technology management program.

    Science.gov (United States)

    Stewart, T R

    1993-06-01

    Strategic technology management decisions are one of the best opportunities for healthcare providers to positively meet clinical needs, patient expectations and competitiveness goals. Technology management must not be treated as an event (annual capital budgeting) but as a well-thought-out, long-range business plan. A strategic technology management team should be formed that includes all the key strategic business areas, plus ad hoc members from the clinical and biomedical engineering areas. Current and future needs should be assessed and the performance of the plan monitored. A plan will help achieve buy-in from clinicians and reduce unwarranted expenditures on technology.

  16. Small Business and the Risk Management Program

    Science.gov (United States)

    This factsheet helps small businesses comply with the regulation requiring companies that use regulated substances, hazardous chemical such as ammonia and chlorine, to develop a risk management plan, to help prevent accidental toxic or flammable releases.

  17. Weapons Load Crew Management Program Update

    National Research Council Canada - National Science Library

    Richardson, Allan

    1997-01-01

    .... Widely used throughout the Air Force (including Air National Guard and Reserve units), WLCMP is a efficient way of managing load crew training, eliminating much of the time and manpower that is required by manual tracking procedures...

  18. Program documentation with advanced data management systems

    Science.gov (United States)

    Swift, W. B.

    1970-01-01

    The problems of program documentation are considered for those cases in which the programmer is using a computer along with an advanced DMS. Three problem areas discussed include: data description, process description, and execution-time documentation.

  19. Program Development and Evaluation - Finance / Money Management

    OpenAIRE

    2004-01-01

    Karen Biers: Ca$hing in on Business Opportunities: A Curriculum for Building an Effective Home-Based and Micro Business Educational Program. Susan E. Cosgrove: Statewide Personal Financial Literacy Campaign. Susan Shockey: Financial Education Helps IDA Participants Save Money.

  20. Program Director Participation in a Leadership and Management Skills Fellowship and Characteristics of Program Quality.

    Science.gov (United States)

    Carek, Peter J; Mims, Lisa D; Conry, Colleen M; Maxwell, Lisa; Greenwood, Vicki; Pugno, Perry A

    2015-01-01

    The association between a residency program director completing a leadership and management skills fellowship and characteristics of quality and innovation of his/her residency program has not been studied. Therefore, the aim of this study is to examine the association between a residency program director's completion of a specific fellowship addressing these skills (National Institute for Program Director Development or NIPDD) and characteristics of quality and innovation of the program they direct. Using information from the American Academy of Family Physicians (AAFP), National Resident Matching Program (NRMP) and FREIDA® program characteristics were obtained. Descriptive statistics were used to summarize the data. The relationship between programs with a NIPDD graduate as director and program quality measures and indicators of innovation was analyzed using both chi square and logistic regression. Initial analyses showed significant associations between the NIPDD graduate status of a program director and regional location, mean years of program director tenure, and the program's 5-year aggregate ABFM board pass rate from 2007--2011. After grouping the programs into tertiles, the regression model showed significant positive associations with programs offering international experiences and being a NIPDD graduate. Program director participation in a fellowship addressing leadership and management skills (ie, NIPDD) was found to be associated with higher pass rates of new graduates on a Board certification examination and predictive of programs being in the upper tertile of programs in terms of Board pass rates.

  1. Technical Competence of Air Force Acquisition Program Managers.

    Science.gov (United States)

    1987-09-01

    the new Acquisition Manager Career Development Program selection process; and (6) computer software development is an area which warrants increased...officers who will become SPO directors in the future?" Area Times Mentioned Computer Software Development ... ........... .. 14 Basic Electronics

  2. Agents Contribute to Statewide Program Designs in Yardwaste Management.

    Science.gov (United States)

    May, James H.; And Others

    1994-01-01

    A survey of 125 Virginia extension agents received 90 responses demonstrating their knowledge of yard waste management and composting. Results were used to develop public education programs and pilot projects about composting. (SK)

  3. A Program Manager Talks: What Contractors Should Know

    National Research Council Canada - National Science Library

    Bennett, Deanna J

    1997-01-01

    .... The author's recent experience as the program manager for USSOCOM's SETA acquisition has shown her that, despite the drive for open government communication and despite the years of contractors...

  4. Notification: Review of the Contract Management Assessment Program

    Science.gov (United States)

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  5. Remote sensing in operational range management programs in Western Canada

    Science.gov (United States)

    Thompson, M. D.

    1977-01-01

    A pilot program carried out in Western Canada to test remote sensing under semi-operational conditions and display its applicability to operational range management programs was described. Four agencies were involved in the program, two in Alberta and two in Manitoba. Each had different objectives and needs for remote sensing within its range management programs, and each was generally unfamiliar with remote sensing techniques and their applications. Personnel with experience and expertise in the remote sensing and range management fields worked with the agency personnel through every phase of the pilot program. Results indicate that these agencies have found remote sensing to be a cost effective tool and will begin to utilize remote sensing in their operational work during ensuing seasons.

  6. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  7. Enrollment of SME Managers to Growth-oriented Training Programs

    DEFF Research Database (Denmark)

    Bager, Torben; Jensen, Kent Wickstrøm; Schou Nielsen, Pia

    2015-01-01

    Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth-intention......Purpose: Entrepreneurial learning through formal growth-oriented training programs for SME managers promises to enhance the growth competences and growth intentions of the enrolled managers. The impact of such programs, however, depends on who enrolls since initial competence and growth......-intention levels vary significantly. Potential participants may suffer from limited ability to transform new knowledge into practice, absence of growth intention and too high or too low a prior competence level to be able to benefit substantially. Selection and self-selection processes therefore have a bearing...... on the extent to which such programs result in additionality, i.e. improved growth performance compared to non-intervention. Design/methodology Selection and self-selection processes are explored through a study of a large-scale training program for growth oriented managers of small Danish firms. This program...

  8. Outcomes and lessons learned from evaluating TRICARE's disease management programs.

    Science.gov (United States)

    Dall, Timothy M; Askarinam Wagner, Rachel C; Zhang, Yiduo; Yang, Wenya; Arday, David R; Gantt, Cynthia J

    2010-06-01

    To share outcomes and lessons learned from an evaluation of disease management (DM) programs for asthma, congestive heart failure (CHF), and diabetes for TRICARE patients. Multiyear evaluation of participants in voluntary, opt-out DM programs. Patient-centered programs, administered by 3 regional contractors, provide phone-based consultations with a care manager, educational materials, and newsletters. The study sample consisted of 23,793 asthma, 4092 CHF, and 29,604 diabetes patients with at least 6 months' tenure in the program. Medical claims were analyzed to quantify program effect on healthcare utilization, medical costs, and clinical outcomes. Multivariate regression analysis with an historical control group was used to predict patient outcomes in the absence of DM. The difference between actual and predicted DM patient outcomes was attributed to the program. A patient survey collected data on program satisfaction and perceived usefulness of program information and services. Modest improvements in patient outcomes included reduced inpatient days and medical costs, and (with few exceptions) increased percentages of patients receiving appropriate medications and tests. Annual per patient reductions in medical costs were $453, $371, and $783 for asthma, CHF, and diabetes program participants, respectively. The estimated return on investment was $1.26 per $1.00 spent on DM services. Findings suggest that the DM programs more than pay for themselves, in addition to improving patient health and quality of life. Lessons learned in program design, implementation, effectiveness, and evaluation may benefit employers contemplating DM, DM providers, and evaluators of DM programs.

  9. Disease Management, Case Management, Care Management, and Care Coordination: A Framework and a Brief Manual for Care Programs and Staff.

    Science.gov (United States)

    Ahmed, Osman I

    2016-01-01

    With the changing landscape of health care delivery in the United States since the passage of the Patient Protection and Affordable Care Act in 2010, health care organizations have struggled to keep pace with the evolving paradigm, particularly as it pertains to population health management. New nomenclature emerged to describe components of the new environment, and familiar words were put to use in an entirely different context. This article proposes a working framework for activities performed in case management, disease management, care management, and care coordination. The author offers standard working definitions for some of the most frequently used words in the health care industry with the goal of increasing consistency for their use, especially in the backdrop of the Centers for Medicaid & Medicare Services offering a "chronic case management fee" to primary care providers for managing the sickest, high-cost Medicare patients. Health care organizations performing case management, care management, disease management, and care coordination. Road map for consistency among users, in reporting, comparison, and for success of care management/coordination programs. This article offers a working framework for disease managers, case and care managers, and care coordinators. It suggests standard definitions to use for disease management, case management, care management, and care coordination. Moreover, the use of clear terminology will facilitate comparing, contrasting, and evaluating all care programs and increase consistency. The article can improve understanding of care program components and success factors, estimate program value and effectiveness, heighten awareness of consumer engagement tools, recognize current state and challenges for care programs, understand the role of health information technology solutions in care programs, and use information and knowledge gained to assess and improve care programs to design the "next generation" of programs.

  10. UMTRA Project Administrative Files Collection Records Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

  11. Behavior Management Techniques in Predoctoral and Postdoctoral Pediatric Dentistry Programs.

    Science.gov (United States)

    Belanger, Gary K.; Tilliss, Terri S.

    1993-01-01

    A survey determined the extent to which selected pediatric dental behavior management techniques are taught both didactically and clinically in 46 predoctoral and 45 postdoctoral programs. Results and trends are reported within the four categories of sedation, restraint, parental presence, and communications behavior management. (GLR)

  12. Psychotropic Medication Management in a Residential Group Care Program

    Science.gov (United States)

    Spellman, Douglas F.; Griffith, Annette K.; Huefner, Jonathan C.; Wise, Neil, III; McElderry, Ellen; Leslie, Laurel K.

    2010-01-01

    This article presents a psychotropic medication management approach that is used within a residential care program. The approach is used to assess medications at youths' times of entry and to facilitate decision making during care. Data from a typical case study have indicated that by making medication management decisions slowly, systematically,…

  13. Sustainable Supply Chain Management Programs in the 21st Century

    Science.gov (United States)

    Neureuther, Brian D.; O'Neill, Kevin

    2011-01-01

    One of the most difficult challenges for an undergraduate supply chain management program at smaller universities is to create an environment of sustainability. Supply chain management is not at the tip of tongue for many graduating high school students and few undergraduate curriculums require a course in the content area. This research addresses…

  14. Defense Manufacturing Management Guide for Program Managers, Third Edition

    Science.gov (United States)

    1989-04-01

    document tited, INDUSTRIAL BASE IMPACTS "Bolstering Defer s.• ,ndustrlal The Impact of crucial industnal base Competitiveness." datod July 1988. !n...v CHAPTERS I OVERVIEW OF DOD MANUFACTURING MANAGEMENT 2 THE INDUSTRIAL BASE 3 PRODUCT DEVELOPMENT 4 MANUFACTURING STRATEGY 5 TOTAL QUALITY MANAGEMENT...the Product 2-8 2-2 Industrial Spending In U.S. for Research and Development 2-10 2-3 Air Force Data Flow for Production Base Analysis 2-14 2-4

  15. A Perspective on a Management Information Systems (MIS) Program Review

    Science.gov (United States)

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  16. 75 FR 4098 - Section 8 Management Assessment Program (SEMAP) Certification

    Science.gov (United States)

    2010-01-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Section 8 Management Assessment Program (SEMAP) Certification AGENCY: Office of the... Program (SEMAP) Certification. OMB Approval Number: 2577-0215. Form Numbers: HUD-52648. Description of the...

  17. Programs for the Gifted - Site Management. Revised 1977.

    Science.gov (United States)

    Heppell, Helen M.

    The manual is designed to help educational personnel handle day-to-day responsibilities and managment of programs for the gifted in the San Diego City schools. The first section explores program maintenance and describes services, identifies departmental sources, and offers suggestions for optimum use of services. The second and third sections…

  18. An Evaluation of CHAMPS: A Classroom Management Program

    Science.gov (United States)

    Minnear, Holly J.

    2015-01-01

    This dissertation was designed to examine the impact of Conversation, Help, Activity, Movement, Participation, Success (CHAMPS), a classroom management program in elementary schools in a district in North Carolina. The participants included principals and teachers who attended a 2-day training course and implemented the CHAMPS program at their…

  19. Outcomes Assessment in Accredited Health Information Management Programs

    Science.gov (United States)

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  20. Economic efficiency of fire management programs at six National Forests

    Science.gov (United States)

    Dennis L. Schweitzer; Ernest V. Andersen; Thomas J. Mills

    1982-01-01

    Two components of fire management programs were analyzed at these Forests: Francis Marion (South Carolina), Huron-Manistee (Michigan), San Bernardino (California), Tonto (Arizona), and Deschutes and Willamette (Oregon). Initial attack and aviation operations were evaluated by the criterion of minimizing the program cost plus the net value change of resource outputs and...

  1. Core TuLiP - Logic Programming for Trust Management

    NARCIS (Netherlands)

    Czenko, M.R.; Etalle, Sandro; Dahl, V.; Niemelä, I.

    2007-01-01

    We propose CoreTuLiP - the core of a trust management language based on Logic Programming. CoreTuLiP is based on a subset of moded logic programming, but enjoys the features of TM languages such as RT; in particular clauses are issued by different authorities and stored in a distributed manner. We

  2. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia

  3. Sandia National Laboratories, California Environmental Management System Program Manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories

  4. Sandia National Laboratories, California Environmental Management System program manual.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has

  5. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  6. Straight Talk: Major Program Manager Views of Defense Acquisition

    OpenAIRE

    Roy Wood; Al Moseley

    2011-01-01

    Proceedings Paper (for Acquisition Research Program) Current efforts by the Office of the Secretary of Defense (OSD) and the Under Secretary of Defense for Acquisition, Technology, and Logistics (USD[AT&L]) to improve acquisition outcomes are focused on addressing perceived problems that create inefficiencies in major programs. Program Manager (PM) Forums were established by senior acquisition leaders within OSD to hear directly from a sampling of major PMs to help key OSD leaders underst...

  7. Health Education Program on Stress Management for High School Students

    OpenAIRE

    林, 姫辰; 衛藤, 隆

    2000-01-01

    The purpose of this study was to develop a health education program on stress management for high school students. In this program, we intended students to understand the effects of stressors on their mental and physical health, to be aware of their own stress and coping patterns, and to cope and behave in more improved manners. Learning activities in this program consist of brain storming, mapping of stress coping, drawing their own profiles of stressors, stress coping, and stress responses,...

  8. Transaction Costs from a Program Manager’s Perspective

    Science.gov (United States)

    2009-09-28

    for the governments of Mexico and the Czech Republic on achieving excellence in the public sector. As an adjunct professor for the University of...we attempted to directly measure transactions costs for defense acquisition programs using the expenditures of the Program Management Office ( PMO ...as an approximate measure of the amount of transaction costs present in an acquisition program. We found that DoD does not track PMO costs

  9. Thrips management program for horticultural crops

    Science.gov (United States)

    This article presents a systems approach for managing key thrips pests including western flower thrips (Frankliniella occidentalis) and chilli thrips (Scirtothrips dorsalis) known to cause millions of dollars loss annually. Thrips small size (1-2 mm), thigmotactic behavior, high reproductive rate an...

  10. Integrating Cybersecurity into the Program Management Organization

    Science.gov (United States)

    2015-05-13

    with RMF continuous monitoring to optimize mission effects throughout the acquisition lifecycle  Guidebook relates content to DoD cybersecurity...test)  Approach to evaluating, documenting and managing risk (e.g., RMF )  Degree to which tools reflect best practices in selection and

  11. 78 FR 24212 - Tribal Management Grant Program

    Science.gov (United States)

    2013-04-24

    .... 450b(l). Tribal organizations must provide proof of non-profit status. Tribal organizations are... additional proof of applicant status documents required such as Tribal resolutions, proof of non-profit..., Program Analyst, Office of Tribal Self-Governance, Indian Health Service, Reyes Building, 801 Thompson...

  12. Management. Program CIP: Business Management: 52.0204

    Science.gov (United States)

    Murdock, Ashleigh Barbee, Ed.

    2008-01-01

    Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  13. Waste Management Program. Technical progress report, Aporil-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  14. Waste Management Program. Technical progress report, July-December, 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement.

  15. Calvin’s concept of and the Formulary of the GKSA on the Lord’s Supper

    Directory of Open Access Journals (Sweden)

    B. Spoelstra

    2001-08-01

    Full Text Available Dutch humanists provided Zwingli with a symbolic concept of the Lord’s Supper by which the bread and wine symbolise the body and blood of Christ on Calvary. These symbolic concepts of body and blood should be commemorated (in memoriam and believed to receive atonement from sin. The Formulary and formula for administering the sacrament in the GKSA were inherited from the Netherlands and contain phrases originally used by Calvin. It is widely claimed and assumed that the contents of the Formulary corresponds with concepts derived from Calvin. Calvin’s commentaries on relevant passages and concepts expressed in his Institutes and Tracts differ radically and entirely from the trend and content of the Formulary and formula of administration used in the GKSA. Calvin does not isolate the death of Christ from resurrection. He does not dwell upon communion with something Christ did for us in the past. He accepts the sacrifice (blood to ratify a covenant (new testament by which the household of God is established. The bread and cup signify Christ, and are regarded as God’s spiritual nourishment for his household. The living Christ in heaven is present in the Holy Spirit at the Lord’s health-giving table. The symbols of bread and cup remain what they are but through faith change to represent Christ. Calvin’s concept of communion and unity is irreconcilable with the concept of a sacramental meal of commemoration (Zwingli. The concept of communion corresponds with early Christian and even Roman and Lutheran traditions. Faith in atonement belongs to commencement of salvation (viz. baptism and the Formulary of the GKSA on the Lord’s Supper. Being nourished with Christ through faith belongs to the consummation of salvation (viz. communion.

  16. Multi-indication Pharmacotherapeutic Multicriteria Decision Analytic Model for the Comparative Formulary Inclusion of Proton Pump Inhibitors in Qatar.

    Science.gov (United States)

    Al-Badriyeh, Daoud; Alabbadi, Ibrahim; Fahey, Michael; Al-Khal, Abdullatif; Zaidan, Manal

    2016-05-01

    The formulary inclusion of proton pump inhibitors (PPIs) in the government hospital health services in Qatar is not comparative or restricted. Requests to include a PPI in the formulary are typically accepted if evidence of efficacy and tolerability is presented. There are no literature reports of a PPI scoring model that is based on comparatively weighted multiple indications and no reports of PPI selection in Qatar or the Middle East. This study aims to compare first-line use of the PPIs that exist in Qatar. The economic effect of the study recommendations was also quantified. A comparative, evidence-based multicriteria decision analysis (MCDA) model was constructed to follow the multiple indications and pharmacotherapeutic criteria of PPIs. Literature and an expert panel informed the selection criteria of PPIs. Input from the relevant local clinician population steered the relative weighting of selection criteria. Comparatively scored PPIs, exceeding a defined score threshold, were recommended for selection. Weighted model scores were successfully developed, with 95% CI and 5% margin of error. The model comprised 7 main criteria and 38 subcriteria. Main criteria are indication, dosage frequency, treatment duration, best published evidence, available formulations, drug interactions, and pharmacokinetic and pharmacodynamic properties. Most weight was achieved for the indications selection criteria. Esomeprazole and rabeprazole were suggested as formulary options, followed by lansoprazole for nonformulary use. The estimated effect of the study recommendations was up to a 15.3% reduction in the annual PPI expenditure. Robustness of study conclusions against variabilities in study inputs was confirmed via sensitivity analyses. The implementation of a locally developed PPI-specific comparative MCDA scoring model, which is multiweighted indication and criteria based, into the Qatari formulary selection practices is a successful evidence-based cost-cutting exercise

  17. National Waste Terminal Storage Program: critical element management concept. Volume I. Management summary

    Energy Technology Data Exchange (ETDEWEB)

    1977-05-01

    CEM is oriented towards identifying, quantifying and curtailing probable impediments to a program originating from both the internal and external program environments. Critical elements are defined as events, trends or conditions that could generate potential uncertainties in the program. The critical elements are broken down into components against which management action is initiated.

  18. Trigeminal neuralgia – a coherent cross-specialty management program

    DEFF Research Database (Denmark)

    Heinskou, Tone; Maarbjerg, Stine; Rochat, Per Bjørnstad

    2015-01-01

    of TN. METHODS: Based on collaboration between neurologists, neuroradiologists and neurosurgeons a standardized program for TN was implemented in May 2012 at the Danish Headache Center (DHC). First out-patient visit and subsequent 3.0 Tesla MRI scan was booked in an accelerated manner. The MRI scan......BACKGROUND: Optimal management of patients with classical trigeminal neuralgia (TN) requires specific treatment programs and close collaboration between medical, radiological and surgical specialties. Organization of such treatment programs has never been described before. With this paper we aim...... to describe the implementation and feasibility of an accelerated cross-speciality management program, to describe the collaboration between the involved specialties and to report the patient flow during the first 2 years after implementation. Finally, we aim to stimulate discussions about optimal management...

  19. ICPP Waste Management Technology Development Program

    Energy Technology Data Exchange (ETDEWEB)

    Hogg, G.W.; Olson, A.L.; Knecht, D.A. [Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States); Bonkoski, M.J. [USDOE, Washington, DC (United States)

    1993-01-01

    As a result of the decision to curtail reprocessing at the Idaho Chemical Processing Plant (ICPP), a Spent fuel and Waste Management Technology Development plan has been implemented to identify acceptable options for disposing of the (1) sodium-bearing liquid radioactive waste, (2) radioactive calcine, and (3) irradiated spent fuel stored at the Idaho National Engineering Laboratory (INEL). The plan was developed jointly by DOE and WINCO.

  20. Obesity weight management and bariatric surgery case management programs: a review of literature.

    Science.gov (United States)

    Echols, Jennie

    2010-01-01

    The proportion of Americans with clinically severe obesity has vast implications for the nation's healthcare system since this population have twice as many chronic medical conditions as people with normal weight. Through the use of review of literature, this article (a) describes the types of weight loss programs; (b) reviews the results from studies on effectiveness of bariatric surgery; and (c) identifies recommendations for obesity and bariatric surgery case management programs. Disease management companies appear to be concentrating on general weight loss strategies associated with wellness and other condition-specific disease management products, whereas larger national healthcare companies with at-risk and insurance products offer specific bariatric surgery management products. Case management programs within healthcare systems, health management organizations, and insurance companies are frequently faced with the management of individuals with morbid obesity and, increasingly, those who are requesting or have undergone bariatric surgery. Research shows that morbid obesity is a disease that remains generally unresponsive to diet and drug therapy but appears to respond well to bariatric surgery. Research findings suggest that surgical treatment is more effective than pharmacological treatment of weight loss and the control of some comorbidities associated with obesity. The number of Americans having weight loss surgery increased by 804% between 1998 and 2004, which appears to be a driver for the recent development of obesity disease management and bariatric surgery case management programs. Although the immaturity and lack of studies citing outcomes of obesity disease and case management programs limit the identification of best practices based on outcomes, emerging practices can be identified and recommendations for case management can be formulated. In addition to primary prevention and treatment programs for obesity, this article describes program

  1. New master program in management in biophotonics and biotechnologies

    Science.gov (United States)

    Meglinski, I. V.; Tuchin, V. V.

    2006-08-01

    We develop new graduate educational highly interdisciplinary program that will be useful for addressing problems in worldwide biotechnologies and related biomedical industries. This Master program called Management in Biophotonics and Biotechnologies provides students with the necessary training, education and problem-solving skills to produce managers who are better equipped to handle the challenges of modern business in modern biotechnologies. Administered jointly by Cranfield University (UK) and Saratov State University, Russia) graduates possess a blend of engineering, biotechnologies, business and interpersonal skills necessary for success in industry. The Master courses combine a regular year program in biophotonics & biotechnologies disciplines with the core requirements of a Master degree. A major advantage of the program is that it will provide skills not currently available to graduates in any other program, and it will give the graduates an extra competitive edge for getting a job then.

  2. Building effective cybersecurity programs a security manager's handbook

    CERN Document Server

    Schreider, Tari

    2017-01-01

    You know by now that your company could not survive without the Internet. Not in today's market. You are either part of the digital economy or reliant upon it. With critical information assets at risk, your company requires a state-of-the-art cybersecurity program. But how do you achieve the best possible program? Tari Schreider, in Building Effective Cybersecurity Programs: A Security Manager's Handbook, lays out the step-by-step roadmap to follow as you build or enhance your cybersecurity program.

  3. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    This report presents a Campbell systematic review on the effectiveness of workplace disability management programs (WPDM programs) promoting return to work (RTW), as implemented and practised by employers. The objectives of this review were to assess the effects of WPDM programs, to examine...... non-randomized studies (NRS) and eleven single group ‘before and after’ studies (B & A)), including data from eleven different WPDM programs, met the inclusion criteria. There were insufficient data on the characteristics of the sample and the effect sizes were uncertain. There is a lack of evidence...

  4. Program Management Approach to the Territorial Development of Small Business

    Directory of Open Access Journals (Sweden)

    Natalia Aleksandrovna Knysh

    2016-06-01

    Full Text Available This article presents the results of the research of the application on a state level of the program management approach to the territorial development of small business. Studying the main mechanism of the state policy implementation in the sphere of small business on a regional level, the authors have revealed the necessity to take into account the territorial specificity while the government programs of small business development are being formed. The analysis of the national practice of utilizing the program management mechanism in the regional system of the government support of small entrepreneurship was conducted on the example of Omsk region. The results of the analysis have shown the inefficiency of the current support system for small business and have determined the need to create an integrated model of territorial programming, which would not only contribute to the qualitative development of small business, but also provide the functioning efficiency of program management mechanism. As a result, the authors have created the two-level model of the programming of the territorial development of small business, which allows to satisfy purposefully the needs of entrepreneurship taking into account the specificity of the internal and external environment of the region. The first level of the model is methodological one and it is based on the marketing approach (the concepts of place marketing and relationship marketing to the operation of the program management mechanism. The second level of the model is methodical one. It offers the combination of the flexible methods of management of programming procedure (benchmarking, foresight, crowdsourcing and outsourcing. The given model raises the efficiency of the management decisions of the state structures in the sphere of small business. Therefore, it is interesting for the government authorities, which are responsible for the regional and municipal support programs of small business, as well

  5. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  6. Do Program Implementation Factors or Fidelity Affect Chronic Disease Self-Management Education Programs' Outcomes?

    Science.gov (United States)

    Brady, Teresa J; Murphy, Louise B; O'Colmain, Benita J; Hobson, Reeti Desai

    2017-09-01

    To evaluate whether implementation factors or fidelity moderate chronic disease self-management education program outcomes. Meta-analysis of 34 Arthritis Self-Management Program and Chronic Disease Self-Management Program studies. Community. N = 10 792. Twelve implementation factors: program delivery fidelity and setting and leader and participant characteristics. Eighteen program outcomes: self-reported health behaviors, physical health status, psychological health status, and health-care utilization. Meta-analysis using pooled effect sizes. Modest to moderate statistically significant differences for 4 of 6 implementation factors; these findings were counterintuitive with better outcomes when leaders and participants were unpaid, leaders had less than minimum training, and implementation did not meet fidelity requirements. Exploratory study findings suggest that these interventions tolerate some variability in implementation factors. Further work is needed to identify key elements where fidelity is essential for intervention effectiveness.

  7. Integrated Risk and Knowledge Management Program -- IRKM-P

    Science.gov (United States)

    Lengyel, David M.

    2009-01-01

    The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.

  8. Subjective Experiences of Clients in a Voluntary Money Management Program.

    Science.gov (United States)

    Serowik, Kristin L; Bellamy, Chyrell D; Rowe, Michael; Rosen, Marc I

    2013-01-01

    A large proportion of people diagnosed with mental illnesses have difficulty managing their money, and therefore many psychiatric treatments involve providing money management assistance. However, little is known about the subjective experience of having a money manager, and extant literature is restricted to people forced to work with a representative payee or conservator. In this study, fifteen people were interviewed about their experience receiving a voluntary money management intervention designed to minimize substance use. Clients emphasized the importance of trusting the money manager, financial mindfulness (an enhanced awareness of the financial transactions in clients' day-to-day lives), agency over their own affairs, and addiction. In contrast to evaluations of people assigned representative payees and/or conservators, there was little mention of feeling coerced. These findings suggest that money management programs can address client concerns by building trust, relating budgeting to clients' day-to-day lives, and encouraging clients' control over their own affairs.

  9. Sustainability Management Program for Industries- A Case Study

    Directory of Open Access Journals (Sweden)

    Long Su Weng Alwin

    2017-01-01

    Full Text Available This research studied the effectiveness of Sustainability Management Program in improving production efficiency of the manufacturing site with verified result using the regression analysis. For this study, a dairy manufacturing industry located in Malaysia was selected and major energy consuming equipment in the industryplant were identified. Sustainability Management Program (SMP was carried out for three years and energy consumption and product has improved regression coefficients of 0.625 in 2013, 0.826 in 2014, and 0.878 in 2015 as the manufacturing site becomes more energy efficient. This suggests that the energy management should be carried out in a continuous manner with energy management team responsible for energy saving practices.

  10. Development of a chronic care ostomy self-management program.

    Science.gov (United States)

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C; Wendel, Christopher S; Krouse, Robert

    2013-03-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long-term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self-Management Program, which was informed by (1) evidence on published quality-of-life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self-Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies.

  11. Development of a Chronic Care Ostomy Self Management Program

    Science.gov (United States)

    Grant, Marcia; McCorkle, Ruth; Hornbrook, Mark C.; Wendel, Christopher S.; Krouse, Robert

    2012-01-01

    Each year a percentage of the 1.2 million men and women in the United States with a new diagnosis of colorectal cancer join the 700,000 people who have an ostomy. Education targeting the long term, chronic care of this population is lacking. This report describes the development of a Chronic Care Ostomy Self Management Program, which was informed by (1) evidence on published quality of life changes for cancer patients with ostomies, (2) educational suggestions from patients with ostomies, and (3) examination of the usual care of new ostomates to illustrate areas for continued educational emphases and areas for needed education and support. Using these materials, the Chronic Care Ostomy Self Management Program was developed by a team of multi-disciplinary researchers accompanied by experienced ostomy nurses. Testing of the program is in process. Pilot study participants reported high satisfaction with the program syllabus, ostomy nurse leaders, and ostomate peer buddies. PMID:23104143

  12. Small Water System Management Program: 100 K Area

    Energy Technology Data Exchange (ETDEWEB)

    Hunacek, G.S. Jr. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-06-29

    Purposes of this document are: to provide an overview of the service and potable water system presently in service at the Hanford Site`s 100 K Area; to provide future system forecasts based on anticipated DOE activities and programs; to delineate performance, design, and operations criteria; and to describe planned improvements. The objective of the small water system management program is to assure the water system is properly and reliably managed and operated, and continues to exist as a functional and viable entity in accordance with WAC 246-290-410.

  13. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...) and in private industry. Currently-reported earned value data contains invaluable planning and budget information with proven techniques for program management, however, shortcomings of the system are its emphasis...

  14. The ORNL Surplus Facilities Management Program Long Range Plan

    Energy Technology Data Exchange (ETDEWEB)

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  15. A Heart Failure Management Program Using Shared Medical Appointments.

    Science.gov (United States)

    Carroll, Allison J; Howrey, Hillary L; Payvar, Susan; Deshida-Such, Kristen; Kansal, Mayank; Brar, Charanjit K

    2017-04-01

    Disease management programs for heart failure (HF) effectively reduce HF-related hospitalization rates and mortality. Shared medical appointments (SMAs) offer a cost-effective delivery method for HF disease management programs. However, few studies have evaluated this cost-effective delivery method of HF disease management among Veterans with acute HF. We hypothesized that Veterans who attended a multidisciplinary HF-SMA clinic promoting HF self-management, compared those who only received individual treatment through the HF specialty clinic, would have better 12-month hospitalization outcomes. We completed a retrospective review of the VA electronic health record for HF-SMA clinic appointments (1/1/2012 to 12/31/2013). The multidisciplinary HF-SMA program comprised 4 weekly sessions covering topics including HF disease, HF medications, diet adherence, physical activity, psychological well-being, and stress management. Patients who attended the HF-SMA clinic (n=54) were compared to patients who were scheduled for an HF-SMA appointment but never attended and were followed only in the HF clinic (n=37). Outcomes were 12-month HF-related and all-cause hospitalization rates, days in the hospital, and time to first hospitalization. Of 141 patients scheduled for an HF-SMA clinic appointment, 54 met criteria for the HF-SMA clinic group and 37 were included in the HF clinic group. The groups did not significantly differ on any sociodemographic variables. Furthermore, no significant differences were observed between the HF-SMA group and the HF clinic group on demographics or hospitalization outcomes, p>.05 for all comparisons. Our results did not support our hypothesis that offering multidisciplinary, HF-SMAs promoting HF self-management skills, above and beyond the individual disease management care provided in an HF specialty clinic, would improve hospitalization outcomes among Veterans with acute HF. Limitations of the present study and recommendations for HF self-management

  16. Identification of an Effective Total Quality Management Training Program

    Science.gov (United States)

    1990-07-31

    quality= Responding to the consumer’s demand for the best value healthm r care, J. Nursing Quality Assurance. 2(3):70-78. - " mx"D0 Implementing Total...Quality takes 10 steps forward, Healthcare Forum Journal . 29-34. Process Management Institute, Inc. (1987). Achieving Integration of m the Philosophy of...missing link, Journal of Quality Assurance, 8-36. Effective Training Program 48 Tennessee Associates International (1990). Managing for Continuous

  17. Significant Personal Qualities Desired of Air Force Program Managers

    Science.gov (United States)

    1976-11-01

    their surroundings, and the people in that environment. But as Knowles and Saxberg explain, "self-awareness and personal change go deeper than mere...Ibid. 42. Logistics Management Institute, "Introduction to Military Program Management," LMI Task 69-28, March 1971, p. 3. 43. Henry P. Knowles and...Chicago: University of Chicago Press, 1964), p. 46. 45. Ibid, p. 47. 46. Malcom P. McNair, "Thinking Ahead: What Price Human Relations?" The Nature and

  18. 77 FR 54615 - Strategic Management Program; Fiscal Year 2013-2016 Strategic Plan

    Science.gov (United States)

    2012-09-05

    ... Doc No: 2012-21820] NATIONAL TRANSPORTATION SAFETY BOARD Strategic Management Program; Fiscal Year..., Strategic Management Program. FOR FURTHER INFORMATION CONTACT: Agency contact, Shamicka Fulson, Program Manager, Strategic Management Program; National Transportation Safety Board, 490 L'Enfant Plaza SW., MD-1...

  19. 48 CFR 1301.671 - Assignment of program and project managers.

    Science.gov (United States)

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  20. COHERENT INTEGRATION OF STRATEGIC PROGRAM MANAGEMENT SUBSYSTEMS OF CITY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Дмитро Заурійович БЕРУЛАВА

    2015-06-01

    Full Text Available Considered by the scientific task of developing and implementing an effective strategic development program of the modern city. Proposes a model of coherent integration of management program subsystem on the stages of its development and implementation. Identified the element subsystems that must be synchronized for the coherent integration. Was concluded about the effectiveness of this approach, outlined the direction of its development.

  1. 12 CFR 1710.19 - Compliance and risk management programs; compliance with other laws.

    Science.gov (United States)

    2010-01-01

    ... management program. (1) An Enterprise shall establish and maintain a risk management program that is reasonably designed to manage the risks of the operations of the Enterprise. (2) The risk management program... executive officer of the Enterprise. The risk management officer shall report regularly to the board of...

  2. A classification of components of workplace disability management programs

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Labriola, Merete; Irvin, Emma

    2014-01-01

    Purpose: This paper presents results from a Campbell systematic review on the nature and effectiveness of workplace disability management programs (WPDM) promoting return to work (RTW), as implemented and practiced by employers. A classification of WPDM program components, based on the review...... were conducted in pairs of reviewers. Studies were clustered around various dimensions of the design and context of programs. Results: 16,932 records were identified by the initial search. 599 papers were assessed for relevance. Thirteen studies met inclusion criteria. Twelve peer reviewed articles...

  3. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2013-02-06

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... its training program to give regulatory project managers the opportunity to tour pharmaceutical... period, small groups (five or less) of regulatory project managers, including a senior level regulatory...

  4. Development of a Standardized Job Description for Healthcare Managers of Metabolic Syndrome Management Programs in Korean Community Health Centers

    Directory of Open Access Journals (Sweden)

    Youngjin Lee, RN, PhD

    2014-03-01

    Conclusion: A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs.

  5. Sandia National Laboratories California Waste Management Program Annual Report April 2011

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2011-04-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  6. An Evaluation of the Major Qualifications Desired of Air Force System Program Managers

    Science.gov (United States)

    1975-01-01

    trait qualifications desired of system program managers over the program life cycle. Interviews were conduqted with the present system program managers of...structure, program managers E.re identified as symbols of leadership of their programs (5:86). 13 The Deputy Secretary of Defense issued a memo- randum...experience, and managerial trait requirements irto the selection and training process of program managers . It is hoped that this research effort will

  7. Sandia National Laboratories California Waste Management Program Annual Report February 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2008-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  8. Risk Management: Earning Recognition with an Automated Safety Program

    Science.gov (United States)

    Lansberry, Linden; Strasburger, Tom

    2012-01-01

    Risk management is a huge task that requires diligent oversight to avoid penalties, fines, or lawsuits. Add in the burden of limited resources that schools face today, and the challenge of meeting the required training, reporting, compliance, and other administrative issues associated with a safety program is almost insurmountable. Despite an…

  9. Implementation of a bowel management program in the treatment of ...

    African Journals Online (AJOL)

    Objectives: Our surgical team has devised a bowel management program (BMP) as a basic approach for primary healthcare providers with the least use of resources. Background: Soiling in children is a major problem that has a serious impact on the child's social and psychological life. Causes vary from idiopathic ...

  10. A Public Education Program in Water Resources Management.

    Science.gov (United States)

    Amend, John R.; Armold, Anita A.

    1983-01-01

    Describes a program designed to improve public awareness/understanding of major factors in managing water resources. Use is made of an interactive computer simulator to place lay people and teachers in decision-making situations involving real variables and alternatives and to project for them the probable consequences of their water management…

  11. Health technology assessment of asthma disease management programs

    NARCIS (Netherlands)

    Steuten, Lotte Maria Gertruda; Lemmens, Karin; Vrijhoef, Bert

    2007-01-01

    Purpose of review: To provide a critical opinion on the extent to which asthma disease management programs currently improve the effectiveness and efficiency of care and directions for future policy and research. Recent findings: The methodological quality of health technology assessment of asthma

  12. Shuttle Program Information Management System (SPIMS) data base

    Science.gov (United States)

    1983-01-01

    The Shuttle Program Information Management System (SPIMS) is a computerized data base operations system. The central computer is the CDC 170-730 located at Johnson Space Center (JSC), Houston, Texas. There are several applications which have been developed and supported by SPIMS. A brief description is given.

  13. Outcomes for a Comprehensive School-Based Asthma Management Program

    Science.gov (United States)

    Gerald, Lynn B.; Redden, David; Wittich, Angelina R.; Hains, Coralie; Turner-Henson, Anne; Hemstreet, Mary P.; Feinstein, Ronald; Erwin, Sue; Bailey, William C.

    2006-01-01

    This article describes the evaluation of a comprehensive school-based asthma management program in an inner-city, largely African-American school system. All 54 elementary schools (combined enrollment 13,247 students) from a single urban school system participated in this study. Schools were randomly divided between immediate and delayed…

  14. Managing Personal Income: Teacher Guide. Family Financial Education Program 1.

    Science.gov (United States)

    Continental Illinois National Bank and Trust Co., Chicago.

    The teacher's guide is for a high school unit on personal income management, part of a family financial education program which also includes a unit on accepting credit responsibility. It can be used by teachers of any subject attempting to develop in students habits and attitudes in the area of earning, saving, and spending. The unit is based on…

  15. Management Styles and Leadership Behavior Within a Residence Life Program.

    Science.gov (United States)

    Moy, James Y. K.; Hales, Loyde W.

    The purpose of this study was to investigate the leadership behavior of Residence Life staff members, the management styles of the organization and their relationship to each other. Staff members and students within the Residence Life Program at Ohio University comprised the sample used. Staff perceptions on the Profile on Organizational…

  16. Program Management Educational Needs of Idaho Business and Marketing Teachers

    Science.gov (United States)

    Kitchel, Allen; Cannon, John; Duncan, Dennis

    2009-01-01

    The purpose of this study was to determine the perceived program management professional development needs of Idaho secondary business/marketing teachers (N = 233) in order to guide pre-service curriculum development and in-service training activities. Sixty-two percent (n = 146) of the 233 teachers completed a modified version of Joerger's (2002)…

  17. Individual Stress Management Coursework in Canadian Teacher Preparation Programs

    Science.gov (United States)

    Harris, Gregory E.

    2011-01-01

    Teacher stress is a significant issue facing the teaching profession. The current paper explores individual stress management as a viable option to address stress in this profession. Specifically, Canadian teacher education programs are examined to identify the prevalence of pre-service teacher education courses focused on individual stress…

  18. Operations Management in the Design and Execution of MBA Programs

    Science.gov (United States)

    Busing, Michael E.; Palocsay, Susan W.

    2016-01-01

    Master of business administration (MBA) programs are under intense pressure to improve efficiencies, lower tuition, and offer refreshed curriculum that is of high quality and regarded as relevant by the marketplace. In light of this environment, the authors propose a conceptual framework for effectively employing operations management (OM)…

  19. Natural Resources Research Program: Catalog of Computer Programs for Project Management.

    Science.gov (United States)

    project management . These include programs developed for use on a microcomputer, as well as those which run on a host computer but are accessed by a terminal in a field office. A one-page description of each program contains the title; preparing agency; abstract; a summary of the data inputs and outputs; equipment, disk, and memory requirements; operating system and programming language; and a contact for further information. The programs described in this publication are not limited to those available within the Corps, but also include those available from other

  20. [Forms of management of the national school meals program].

    Science.gov (United States)

    Dos Santos, Sérgio Ribeiro; de Sousa Costa, Maria Bernadete; Torres de Paiva Bandeira, Geovanna

    2016-04-01

    The National School Meals Programme (PNAE in Portuguese initials) is a supplementary program to education that aims to provide school meals for pupils across the school system enrolled in public and philanthropic schools of primary education, secondary education, youth education, adult education and comprehensive education. The principles of the program are the universality and the expansion of student services in order to meet the Organic Law on Food and Nutritional Security (LOSAN), as well as the Food Security and Nutrition System. The objective of this study is to discuss forms of PNAE management to ensure that the students' right to school meals. This study is a reflection on how the resources of school meals are being managed, be it with a centralized, decentralized, semi-centralized or outsourced model. We conclude that the knowledge of the different forms of managing federal resources for food for school communities allows for making an informed choice regarding implementation and enforcement of PNAE.

  1. Financial impact of population health management programs: reevaluating the literature.

    Science.gov (United States)

    Grossmeier, Jessica; Terry, Paul E; Anderson, David R; Wright, Steven

    2012-06-01

    Although many employers offer some components of worksite-based population health management (PHM), most do not yet invest in comprehensive programs. This hesitation to invest in comprehensive programs may be attributed to numerous factors, such as other more pressing business priorities, reluctance to intervene in the personal health choices of employees, or insufficient funds for employee health. Many decision makers also remain skeptical about whether investment in comprehensive programs will produce a financial return on investment (ROI). Most peer-reviewed studies assessing the financial impact of PHM were published before 2000 and include a broad array of program and study designs. Many of these studies have also included indirect productivity savings in their assessment of financial outcomes. In contrast, this review includes only peer-reviewed studies of the direct health care cost impact of comprehensive PHM programs that meet rigorous methodological criteria. A systematic search of health sciences databases identified only 5 studies with program designs and study methods meeting these selection criteria published after 2007. This focused review found that comprehensive PHM programs can yield a positive ROI based on their impact on direct health care costs, but the level of ROI achieved was lower than that reported by literature reviews with less focused and restrictive qualifying criteria. To yield substantial short-term health care cost savings, the longer term financial return that can credibly be associated with a comprehensive, prevention-oriented population health program must be augmented by other financial impact strategies.

  2. Trigeminal neuralgia--a coherent cross-specialty management program.

    Science.gov (United States)

    Heinskou, Tone; Maarbjerg, Stine; Rochat, Per; Wolfram, Frauke; Jensen, Rigmor Højland; Bendtsen, Lars

    2015-01-01

    Optimal management of patients with classical trigeminal neuralgia (TN) requires specific treatment programs and close collaboration between medical, radiological and surgical specialties. Organization of such treatment programs has never been described before. With this paper we aim to describe the implementation and feasibility of an accelerated cross-speciality management program, to describe the collaboration between the involved specialties and to report the patient flow during the first 2 years after implementation. Finally, we aim to stimulate discussions about optimal management of TN. Based on collaboration between neurologists, neuroradiologists and neurosurgeons a standardized program for TN was implemented in May 2012 at the Danish Headache Center (DHC). First out-patient visit and subsequent 3.0 Tesla MRI scan was booked in an accelerated manner. The MRI scan was performed according to a special TN protocol developed for this program. Patients initially referred to neurosurgery were re-directed to DHC for pre-surgical evaluation of diagnosis and optimization of medical treatment. Follow-up was 2 years with fixed visits where medical treatment and indication for neurosurgery was continuously evaluated. Scientific data was collected in a structured and prospective manner. From May 2012 to April 2014, 130 patients entered the accelerated program. Waiting time for the first out-patient visit was 42 days. Ninety-four percent of the patients had a MRI performed according to the special protocol after a mean of 37 days. Within 2 years follow-up 35% of the patients were referred to neurosurgery after a median time of 65 days. Five scientific papers describing demographics, clinical characteristics and neuroanatomical abnormalities were published. The described cross-speciality management program proved to be feasible and to have acceptable waiting times for referral and highly specialized work-up of TN patients in a public tertiary referral centre for headache

  3. Office of Nuclear Energy Knowledge Management Program Situational Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Kimberlyn C. Mousseau

    2011-12-01

    Knowledge management (KM) has been a high priority for the Department of Energy (DOE) Office of Nuclear Energy (NE) for the past several years. NE Programs are moving toward well-established knowledge management practices and a formal knowledge management program has been established. Knowledge management is being practiced to some level within each of the NE programs. Although it continues to evolve as NE programs evolve, a formal strategic plan that guides the implementation of KM has been developed. Despite the acceptance of KM within DOE NE, more work is necessary before the NE KM program can be considered fully successful. Per Dr. David J. Skyrme[1], an organization typically moves through the following evolutionary phases: (1) Ad-hoc - KM is being practiced to some level in some parts of the organization; (2) Formal - KM is established as a formal project or program; (3) Expanding - the use of KM as a discipline grows in practice across different parts of the organization; (4) Cohesive - there is a degree of coordination of KM; (5) Integrated - there are formal standards and approaches that give every individual access to most organizational knowledge through common interfaces; and (6) Embedded - KM is part-and-parcel of everyday tasks; it blends seamlessly into the background. According to the evolutionary phases, the NE KM program is operating at the two lower levels, Ad-hoc and Formal. Although KM is being practiced to some level, it is not being practiced in a consistent manner across the NE programs. To be fully successful, more emphasis must be placed on establishing KM standards and processes for collecting, organizing, sharing and accessing NE knowledge. Existing knowledge needs to be prioritized and gathered on a routine basis, its existence formally recorded in a knowledge inventory. Governance to ensure the quality of the knowledge being used must also be considered. For easy retrieval, knowledge must be organized according to a taxonomy that

  4. Integral urban solid waste management program in a Mexican university.

    Science.gov (United States)

    Espinosa, R M; Turpin, S; Polanco, G; De Latorre, A; Delfín, I; Raygoza, I

    2008-01-01

    The Azcapotzalco campus of the Universidad Autónoma Metropolitana (UAM-A) has implemented an Integral Urban Solid Waste Management Program, "Segregation for a Better UAM Environment" (Separacción por un mejor UAMbiente). This program is directed to create awareness and involve the academic community of the UAM-A concerning the problem of solid wastes, at the same time fulfilling the local environmental legislation. The program consists in separating solid wastes into two classes: (1) recoverable wastes (glass and PET bottles, aluminum cans, Tetrapak packages) and (2) other wastes (non-recoverable). During the past three years, thanks to this program, the amount of solid wastes delivered monthly to municipal collecting services has been considerably reduced. In this period, UAM-A has sent to recycling: 2.2 tons of glass bottles; 2.3 tons of PET bottles; 1.2 tons of Tetrapak packages and 27.5 kg of aluminum cans.

  5. Learning on human resources management in the radiology residency program

    Directory of Open Access Journals (Sweden)

    Aparecido Ferreira de Oliveira

    2014-04-01

    Full Text Available Objective To investigate the process of learning on human resource management in the radiology residency program at Escola Paulista de Medicina – Universidade Federal de São Paulo, aiming at improving radiologists' education. Materials and Methods Exploratory study with a quantitative and qualitative approach developed with the faculty staff, preceptors and residents of the program, utilizing a Likert questionnaire (46, taped interviews (18, and categorization based on thematic analysis. Results According to 71% of the participants, residents have clarity about their role in the development of their activities, and 48% said that residents have no opportunity to learn how to manage their work in a multidisciplinary team. Conclusion Isolation at medical records room, little interactivity between sectors with diversified and fixed activities, absence of a previous culture and lack of a training program on human resources management may interfere in the development of skills for the residents' practice. There is a need to review objectives of the medical residency in the field of radiology, incorporating, whenever possible, the commitment to the training of skills related to human resources management thus widening the scope of abilities of the future radiologists.

  6. Learning on human resources management in the radiology residency program

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Aparecido Ferreira de; Lederman, Henrique Manoel; Batista, Nildo Alves, E-mail: aparecidoliveira@ig.com.br [Universidade Federal de Sao Paulo (EPM/UNIFESP), Sao Paulo, SP (Brazil). Escola Paulista de Medicina

    2014-03-15

    Objective: to investigate the process of learning on human resource management in the radiology residency program at Escola Paulista de Medicina - Universidade Federal de Sao Paulo, aiming at improving radiologists' education. Materials and methods: exploratory study with a quantitative and qualitative approach developed with the faculty staff, preceptors and residents of the program, utilizing a Likert questionnaire (46), taped interviews (18), and categorization based on thematic analysis. Results: According to 71% of the participants, residents have clarity about their role in the development of their activities, and 48% said that residents have no opportunity to learn how to manage their work in a multidisciplinary team. Conclusion: Isolation at medical records room, little interactivity between sectors with diversified and fixed activities, absence of a previous culture and lack of a training program on human resources management may interfere in the development of skills for the residents' practice. There is a need to review objectives of the medical residency in the field of radiology, incorporating, whenever possible, the commitment to the training of skills related to human resources management thus widening the scope of abilities of the future radiologists. (author)

  7. Development of integrated programs for Aerospace-vehicle Design (IPAD): Product program management systems

    Science.gov (United States)

    Isenberg, J. M.; Southall, J. W.

    1979-01-01

    The Integrated Programs for Aerospace Vehicle Design (IPAD) is a computing system to support company-wide design information processing. This document presents a brief description of the management system used to direct and control a product-oriented program. This document, together with the reference design process (CR 2981) and the manufacture interactions with the design process (CR 2982), comprises the reference information that forms the basis for specifying IPAD system requirements.

  8. 34 CFR 74.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Purpose of financial and program management. 74.20... Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments...

  9. 2 CFR 215.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Purpose of financial and program management... Financial and Program Management § 215.20 Purpose of financial and program management. Sections 215.21 through 215.28 prescribe standards for financial management systems, methods for making payments and rules...

  10. 22 CFR 518.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods for...

  11. Watershed management program on Santiago Island, Cape Verde

    Science.gov (United States)

    Lopes, Vicente L.; Meyer, John

    1993-01-01

    The Watershed Management Program (WMP) was put into operation in early 1985 on Santiago Island, Cape Verde, with the stated purpose, “to develop and protect the soil and water resources of the Program-designated watersheds … to stabilize the natural environment and increase agricultural production potential in the Program area.” The approach to soil and water conservation in the program has been to build erosion and flood control structures (engineering approach) and plant trees (biological approach) to decrease rill and gully erosion, trap sediment behind control structures, provide flood protection, increase infiltration, increase fuelwood and fodder production, and increase water supplies for irrigation. There have been many successes resulting from specific management activities, but flawed approach or implementation in a few key areas has acted to impede the program's complete success, including lack of a scientific basis for evaluating its impact on soil and water conservation; poor design, placement, and maintenance of some major hydraulic structures; inadequate intervention in stabilizing farmlands or education of farmers and landowners in the need for and benefits of agroforestry; and incomplete integration of engineering and biological approaches.

  12. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  13. Sandia National Laboratories, California Waste Management Program annual report : February 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2009-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System rogram Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  14. Sandia National Laboratories, California Hazardous Materials Management Program annual report : February 2009.

    Energy Technology Data Exchange (ETDEWEB)

    Brynildson, Mark E.

    2009-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental anagement ystem Program Manual. This program annual report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  15. Workplace disability management programs promoting return-to-work

    DEFF Research Database (Denmark)

    Gensby, Ulrik; Lund, Thomas; Kowalski, Krystyna

    is still needed. This review will evaluate the effect of workplace disability management programs promoting RTW - i.e. report on the evidence and describes and combine results from individual studies on workplace disability management programs and explain possible variations in practice....... economic and social consequences. The share of the working-age population relying on disability and sickness benefits as their main source of income has tended to increase in many OECD countries. Long-term sickness absence also represents substantial life events, where the duration of absence due to injury...... or illness increases the future risk of receiving disability pension and permanent exclusion from the labour market. In recent years the multidimensional characteristics of work disability prevention has been emphasised as a key perspective to understand the complexity in helping workers with disabling...

  16. Overview of NRC Proactive Management of Materials Degradation (PMMD) Program

    Science.gov (United States)

    Carpenter, C. E. Gene; Hull, Amy; Oberson, Greg

    Materials degradation phenomena, if not appropriately managed, have the potential to adversely impact the design functionality and safety margins of nuclear power plant (NPP) systems, structures and components (SSCs). Therefore, the U.S. Nuclear Regulatory Commission (NRC) has initiated an over-the-horizon multi-year research Proactive Management of Materials Degradation (PMMD) Research Program, which is presently evaluating longer time frames (i.e., 80 or more years) and including passive long-lived SSCs beyond the primary piping and core internals, such as concrete containment and cable insulation. This will allow the NRC to (1) identify significant knowledge gaps and new forms of degradation; (2) capture current knowledge base; and, (3) prioritize materials degradation research needs and directions for future efforts. This effort is being accomplished in collaboration with the U.S. Department of Energy's (DOE) LWR Sustainability (LWRS) program. This presentation will discuss the activities to date, including results, and the path forward.

  17. What`s new in federal energy management: FEMP program overview. SAVEnergy program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The SAVEnergy Program provides direct assistance to Federal agencies in identifying and implementing energy efficiency and water conservation measures. The Energy Policy Act of 1992 (EPAct) and Executive Order 12902 require that Federal agencies reduce the energy consumed in Federal buildings. The Executive Order increases the goal to a 30% reduction, compared with 1985, by 2005. In addition, agencies are required, to the maximum extent possible, to install all energy and water conservation measures with paybacks of less than 10 years. To help meet these goals, the US Department of Energy`s (DOE`s) Federal Energy management Program (FEMP) recently initiated the SAVEnergy Program. The SAVEnergy approach has three key elements: The Action Plan with recommended conservation actions and complete proposals on how the agency can implement them; The Action Team to implement the SAVEnergy Action Plan; The FEMPTracks database to evaluate the SAVEnergy Program (and all other FEMP programs) and record progress toward conservation goals.

  18. Tank waste remediation system nuclear criticality safety program management review

    Energy Technology Data Exchange (ETDEWEB)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  19. International Border Management Systems (IBMS) Program : visions and strategies.

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, Michael; Mohagheghi, Amir Hossein

    2011-02-01

    Sandia National Laboratories (SNL), International Border Management Systems (IBMS) Program is working to establish a long-term border security strategy with United States Central Command (CENTCOM). Efforts are being made to synthesize border security capabilities and technologies maintained at the Laboratories, and coordinate with subject matter expertise from both the New Mexico and California offices. The vision for SNL is to provide science and technology support for international projects and engagements on border security.

  20. [Thought of charity-persuasion and the compilation, carving and spread of medical formulary in the Qing Dynasty].

    Science.gov (United States)

    Liu, Xiyang

    2015-09-01

    Since the Song Dynasty, morality books aiming at guiding agaisnst evil and persuading charity, spread widely in the civil society. Many medical issues were categorized as encouraging kindness, hence, the thought of encouraging kindness was gradually infiltrated into the development of medical and health services. For the dissemination of medical knowledge, medical formulary became the favorite to well-doers because of its practicability in curing diseases and saving lives. Therefore, the thought of encouraging kindness infiltrated into the compilation, carving and spread of many medical formularies. The thought of encouraging kindness not only rendered a lot of doctors throw their whole life into the cause, but also attracted groups such as Confucian scholars, officers, scholar-officials and many organizations such as benevolent society, benevolent association, bookshop and publishing house to join in, thus increasing the entities of spreaders, expanding the range for the spread of medical knowledge and promoting the popularization and utilization of medical knowledge in grass-root society and remote area, which was helpful in dealing with the social problems such as shortage of medical resources and its uneven distribution.

  1. The Zen of Government Program Management (aka Lessons Learned from a Defense Program Manager)

    Science.gov (United States)

    2014-08-01

    people’s offices oc- casionally, send them periodic e-mails, or reach out to them on Facebook or LinkedIn. By building and maintain a network of competent...succeeded in taking the first steps. Give the Customers Their Sticker Shock Early If the customer can’t deal with the cost, don’t do the program. And a

  2. Transportation risk management : international practices for program development and project delivery.

    Science.gov (United States)

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  3. Risk Management for Study Abroad Programs: Issues and Resources to Inform Program Development, Administration, and Training

    Science.gov (United States)

    Rhodes, Gary

    2014-01-01

    This chapter provides a practical background to the health and safety risks and challenges for U.S. colleges and universities and other program providers. Potential risks, field-based guidelines, good practices, and resources to support the management of risks by study abroad offices will be covered.

  4. Linking Postdoctoral General Dentistry Programs with Managed Care Programs and Settings.

    Science.gov (United States)

    Weaver, Richard G.; Gray, Carolyn F.; Colangelo, Gary A.; Ferretti, Gerald A.; Galbally, James F.; Garrison, Raymond S.; Martens, Les; Hayes, Kathy L.

    1998-01-01

    Presents results of a work group convened by the American Association of Dental Schools to examine experiences related to postdoctoral general dentistry (PGD) programs linked with managed care systems and clinical settings. The group identified factors and conditions believed to be critical to the planning, development, and conduct of PGD programs…

  5. Living Well with a Disability, a Self-Management Program.

    Science.gov (United States)

    Ravesloot, Craig; Seekins, Tom; Traci, Meg; Boehm, Tracy; White, Glen; Witten, Mary Helen; Mayer, Mike; Monson, Jude

    2016-02-12

    Approximately 56.7 million persons in the United States have functional impairments that can lead to disability. As a group, persons with disabilities show disparities in measures of overall health when compared with the general population. Much of this can be attributed to secondary conditions rather than to the impairment itself. Persons with disabilities can prevent and manage many of the conditions that contribute to these disparities. The Living Well with a Disability program was developed to support persons with disabilities to manage their health. The curriculum helps participants achieve early success in self-management of quality-of-life goals to build confidence for making health behavior changes; it includes 11 chapters that facilitators use to conduct an orientation session and 10 weekly, 2-hour sessions. The program has been implemented by 279 community-based agencies in 46 states. On the basis of the data from the field trial, these community applications have served approximately 8,900 persons since 1995, resulting in an estimated savings of $6.4-$28.8 million for health care payers. Persons with disabilities have unique needs that can be addressed through multiple levels of intervention to reduce health disparities. The Living Well with a Disability program is a promising intervention that has demonstrated improvements in health-related quality of life and health care use.

  6. Blazing the energy trail: The Municipal Energy Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Urban Consortium Energy Task Force pioneers energy and environmental solutions for US cities and counties. When local officials participate in the task force, they open the door to many resources for their communities. The US is entering a period of renewed interest in energy management. Improvements in municipal energy management allow communities to free up energy operating funds to meet other needs. These improvements can even keep energy dollars in the community through the purchase of services and products used to save energy. With this idea in mind, the US Department of Energy Municipal Energy Management Program has funded more than 250 projects that demonstrate innovative energy technologies and management tools in cities and counties through the Urban Consortium Energy Task Force (UCETF). UCETF helps the US Department of Energy foster municipal energy management through networks with cities and urbanized counties and through links with three national associations of local governments. UCETF provides funding for projects that demonstrate innovative and realistic technologies, strategies, and methods that help urban America become more energy efficient and environmentally responsible. The task force provides technical support to local jurisdictions selected for projects. UCETF also shares information about successful energy management projects with cities and counties throughout the country via technical reports and project papers. The descriptions included here capsulize a sample of UCETF`s demonstration projects around the country.

  7. A concept for performance management for Federal science programs

    Science.gov (United States)

    Whalen, Kevin G.

    2017-11-06

    The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.

  8. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    Science.gov (United States)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  9. Review and Evaluation Criteria for Management of the Army Foreign Military Sales Program

    National Research Council Canada - National Science Library

    Miller, John

    1976-01-01

    .... Army's Foreign Military Sales (FMS) program. Current and planned reporting and Management Information Systems used for FMS management were reviewed and recommendations made for the use of a Series of customer satisfaction and program magnitude...

  10. INEEL Cultural Resource Management Program Annual Report - 2004

    Energy Technology Data Exchange (ETDEWEB)

    Clayton F. Marler

    2005-01-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.

  11. Management of vertebral compression fracture in general practice: BEACH program.

    Directory of Open Access Journals (Sweden)

    Rodrigo Z Megale

    Full Text Available The pain associated with vertebral compression fractures can cause significant loss of function and quality of life for older adults. Despite this, there is little consensus on how best to manage this condition.To describe usual care provided by general practitioners (GPs in Australia for the management of vertebral compression fractures.Data from the Bettering the Evaluation And Care of Health (BEACH program collected between April 2005 and March 2015 was used for this study. Each year, a random sample of approximately 1,000 GPs each recorded information on 100 consecutive encounters. We selected those encounters at which vertebral compression fracture was managed. Analyses of management options were limited to encounters with patients aged 50 years or over.i patient demographics; ii diagnoses/problems managed; iii the management provided for vertebral compression fracture during the encounter. Robust 95% confidence intervals, adjusted for the cluster survey design, were used to assess significant differences between group means.Vertebral compression fractures were managed in 211 (0.022%; 95% CI: 0.018-0.025 of the 977,300 BEACH encounters recorded April 2005- March 2015. That provides a national annual estimate of 26,000 (95% CI: 22,000-29,000 encounters at which vertebral fractures were managed. At encounters with patients aged 50 years or over (those at higher risk of primary osteoporosis, prescription of analgesics was the most common management action, particularly opioids analgesics (47.1 per 100 vertebral fractures; 95% CI: 38.4-55.7. Prescriptions of paracetamol (8.2; 95% CI: 4-12.4 or non-steroidal anti-inflammatory drugs (4.1; 95% CI: 1.1-7.1 were less frequent. Non-pharmacological treatment was provided at a rate of 22.4 per 100 vertebral fractures (95% CI: 14.6-30.1. At least one referral (to hospital, specialist, allied health care or other was given for 12.3 per 100 vertebral fractures (95% CI: 7.8-16.8.The prescription of oral

  12. 42 CFR 423.153 - Drug utilization management, quality assurance, and medication therapy management programs (MTMPs).

    Science.gov (United States)

    2010-10-01

    ... and systems to reduce medication errors and adverse drug interactions and improve medication use that... medication error identification and reduction systems. (5) Provision of information to CMS regarding its... medication therapy management programs (MTMPs). 423.153 Section 423.153 Public Health CENTERS FOR MEDICARE...

  13. Evaluating disease management program effectiveness: an introduction to survival analysis.

    Science.gov (United States)

    Linden, Ariel; Adams, John L; Roberts, Nancy

    2004-01-01

    Currently, the most widely used method in the disease management industry for evaluating program effectiveness is the "total population approach." This model is a pretest-posttest design, with the most basic limitation being that without a control group, there may be sources of bias and/or competing extraneous confounding factors that offer plausible rationale explaining the change from baseline. Survival analysis allows for the inclusion of data from censored cases, those subjects who either "survived" the program without experiencing the event (e.g., achievement of target clinical levels, hospitalization) or left the program prematurely, due to disenrollement from the health plan or program, or were lost to follow-up. Additionally, independent variables may be included in the model to help explain the variability in the outcome measure. In order to maximize the potential of this statistical method, validity of the model and research design must be assured. This paper reviews survival analysis as an alternative, and more appropriate, approach to evaluating DM program effectiveness than the current total population approach.

  14. Syracuse/NASA program: A historical critique: Multidisciplinary studies in management and development programs in the public sector

    Science.gov (United States)

    Barzelay, M. E.

    1974-01-01

    A historical critique is presented of the Syracuse/NASA program on management and development programs. Brief summaries are included of each of the major projects undertaken, including identification of the principal investigators and the university departments and disciplines involved.

  15. Pediatric Patient Blood Management Programs: Not Just Transfusing Little Adults.

    Science.gov (United States)

    Goel, Ruchika; Cushing, Melissa M; Tobian, Aaron A R

    2016-10-01

    Red blood cell transfusions are a common life-saving intervention for neonates and children with anemia, but transfusion decisions, indications, and doses in neonates and children are different from those of adults. Patient blood management (PBM) programs are designed to assist clinicians with appropriately transfusing patients. Although PBM programs are well recognized and appreciated in the adult setting, they are quite far from standard of care in the pediatric patient population. Adult PBM standards cannot be uniformly applied to children, and there currently is significant variation in transfusion practices. Because transfusing unnecessarily can expose children to increased risk without benefit, it is important to design PBM programs to standardize transfusion decisions. This article assesses the key elements necessary for a successful pediatric PBM program, systematically explores various possible pediatric specific blood conservation strategies and the current available literature supporting them, and outlines the gaps in the evidence suggesting need for further/improved research. Pediatric PBM programs are critically important initiatives that not only involve a cooperative effort between pediatric surgery, anesthesia, perfusion, critical care, and transfusion medicine services but also need operational support from administration, clinical leadership, finance, and the hospital information technology personnel. These programs also expand the scope for high-quality collaborative research. A key component of pediatric PBM programs is monitoring pediatric blood utilization and assessing adherence to transfusion guidelines. Data suggest that restrictive transfusion strategies should be used for neonates and children similar to adults, but further research is needed to assess the best oxygenation requirements, hemoglobin threshold, and transfusion strategy for patients with active bleeding, hemodynamic instability, unstable cardiac disease, and cyanotic cardiac

  16. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  17. 20 CFR 435.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Purpose of financial and program management... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.20 Purpose of financial and program management. Sections 435.21 through 435.28 prescribe standards for...

  18. 24 CFR 84.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-04-01

    ... and Program Management § 84.20 Purpose of financial and program management. Sections 84.21 through 84.28 prescribe standards for financial management systems, methods for making payments and rules for... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Purpose of financial and program...

  19. 45 CFR 2543.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Purpose of financial and program management. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards for...

  20. Integrated Pest Management: A Curriculum for Early Care and Education Programs

    Science.gov (United States)

    California Childcare Health Program, 2011

    2011-01-01

    This "Integrated Pest Management Toolkit for Early Care and Education Programs" presents practical information about using integrated pest management (IPM) to prevent and manage pest problems in early care and education programs. This curriculum will help people in early care and education programs learn how to keep pests out of early…

  1. 75 FR 47444 - Amendments to the Informal and Other Procedures, Rules of Organization and Program Management...

    Science.gov (United States)

    2010-08-06

    ... Organization and Program Management, and Rules of Practice; Interim Commission Review of Public Company... of 2002 (the ``Act''), and its Rules of Organization and Program Management and Rules of Practice to... Organization and Program Management \\3\\ to provide delegations of authority to the Chief Accountant related to...

  2. 75 FR 76691 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ... waste management program. On January 7, 2010, EPA published a final rule under docket EPA-R10-RCRA 2009... Hazardous Waste Management Program. These authorized changes included, among others, the Federal Recycled... Hazardous Waste Management Program Revision though a direct final rule without prior proposal because the...

  3. 76 FR 26616 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... AGENCY 40 CFR Part 272 Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management... hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management Programs'' to provide notice of the authorization status of State...

  4. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ... AGENCY 40 CFR Part 271 Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  5. 75 FR 45489 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-03

    ... AGENCY 40 CFR Part 272 New York: Incorporation by Reference of State Hazardous Waste Management Program... Hazardous Waste Management Programs'' to provide notice of the authorization status of State programs and to.... The rule codifies in the regulations the prior approval of New York's hazardous waste management...

  6. 75 FR 60398 - California: Proposed Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-09-30

    ... AGENCY 40 CFR Part 271 California: Proposed Authorization of State Hazardous Waste Management Program... application for authorization for changes to its hazardous waste management program by November 1, 2010... waste management program. EPA continues to have independent enforcement authority under RCRA sections...

  7. 77 FR 29231 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-05-17

    ... AGENCY 40 CFR Part 272 Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management... Hazardous Waste Management Programs'' to provide notice of the authorization status of State programs and to...'s hazardous waste management program and incorporates by reference authorized provisions of the...

  8. 77 FR 38530 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-06-28

    ... AGENCY 40 CFR Part 271 Louisiana: Final Authorization of State Hazardous Waste Management Program..., (50 FR 3348), to implement its base Hazardous Waste Management Program. We granted authorization for... operate all aspects of their hazardous waste management programs in lieu of the Federal government. The...

  9. 77 FR 46964 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-08-07

    ... AGENCY 40 CFR Part 272 Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management... Hazardous Waste Management Programs'' to provide notice of the authorization status of State programs and to...'s hazardous waste management program and incorporates by reference authorized provisions of the...

  10. 12 CFR 615.5181 - Bank interest rate risk management program.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bank interest rate risk management program. 615....5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit Bank... the interest rate risk management program and must be knowledgeable of the nature and level of...

  11. 77 FR 33253 - Regulatory Guide 8.33, Quality Management Program

    Science.gov (United States)

    2012-06-05

    ... COMMISSION Regulatory Guide 8.33, Quality Management Program AGENCY: Nuclear Regulatory Commission. ACTION... withdrawing Regulatory Guide (RG) 8.33, ``Quality Management Program.'' This guide provided guidance to ensure that the objectives of the former NRC ``Quality Management Program'' regulations were met. In this...

  12. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  13. Framework for assessing causality in disease management programs: principles.

    Science.gov (United States)

    Wilson, Thomas; MacDowell, Martin

    2003-01-01

    To credibly state that a disease management (DM) program "caused" a specific outcome it is required that metrics observed in the DM population be compared with metrics that would have been expected in the absence of a DM intervention. That requirement can be very difficult to achieve, and epidemiologists and others have developed guiding principles of causality by which credible estimates of DM impact can be made. This paper introduces those key principles. First, DM program metrics must be compared with metrics from a "reference population." This population should be "equivalent" to the DM intervention population on all factors that could independently impact the outcome. In addition, the metrics used in both groups should use the same defining criteria (ie, they must be "comparable" to each other). The degree to which these populations fulfill the "equivalent" assumption and metrics fulfill the "comparability" assumption should be stated. Second, when "equivalence" or "comparability" is not achieved, the DM managers should acknowledge this fact and, where possible, "control" for those factors that may impact the outcome(s). Finally, it is highly unlikely that one study will provide definitive proof of any specific DM program value for all time; thus, we strongly recommend that studies be ongoing, at multiple points in time, and at multiple sites, and, when observational study designs are employed, that more than one type of study design be utilized. Methodologically sophisticated studies that follow these "principles of causality" will greatly enhance the reputation of the important and growing efforts in DM.

  14. Organizational attributes of practices successful at a disease management program.

    Science.gov (United States)

    Cloutier, Michelle M; Wakefield, Dorothy B; Tsimikas, John; Hall, Charles B; Tennen, Howard; Brazil, Kevin

    2009-02-01

    To assess the contribution of organizational factors to implementation of 3 asthma quality measures: enrollment in a disease management program, development of a written treatment plan, and prescription of severity-appropriate anti-inflammatory therapy. A total of 138 pediatric clinicians and 247 office staff in 13 urban clinics and 23 nonurban private practices completed questionnaires about their practice's organizational characteristics (eg, leadership, communication, perceived effectiveness, job satisfaction). 94% of the clinicians and 92% of the office staff completed questionnaires. When adjusted for confounders, greater practice activity and perceived effectiveness in meeting family needs were associated with higher rates of enrollment in the Easy Breathing program, whereas higher scores for 3 organizational characteristics--communication timeliness, decision authority, and job satisfaction--were associated with both higher enrollment and a greater number of written treatment plans. None of the organizational characteristics was associated with greater use of anti-inflammatory therapy. Three organizational characteristics predicted 2 quality asthma measures: use of a disease management program and creation of a written asthma treatment plan. If these organizational characteristics were amenable to change, then our findings could help focus interventions in areas of effective and acceptable organizational change.

  15. Environmental Management 1995: Progress and plans of the Environmental Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  16. Pharmacy characteristics associated with the provision of medication management services within an integrated care management program.

    Science.gov (United States)

    Smith, Megan G; Shea, Christopher M; Brown, Patrick; Wines, Kristen; Farley, Joel F; Ferreri, Stefanie P

    To examine pharmacy operational and personnel characteristics that influence engagement in providing a community pharmacy medication management service within a statewide integrated care management program. Before the program launch, all of the pharmacies were surveyed to collect demographic, operational, and personnel characteristics such as weekly prescription volume and number of staff, respectively. Those data were then compared with engagement in the program. Engagement was defined as providing initial comprehensive medication review as part of the medication management service. Three months after program launch, pharmacies were dichotomized as consistently engaged or inconsistently engaged. Data were analyzed with the use of descriptive statistics and chi-square and t tests to test for statistical significance between consistent and inconsistent engagement groups. A baseline survey was collected for all 123 pharmacies who joined the integrated care management program. After the first 3 months, 50 pharmacies were consistently engaged in the program. Compared with inconsistently engaged pharmacies, consistently engaged pharmacies employed more full-time pharmacists (mean 2.1 vs. 1.8; P = 0.05) and more full-time technicians (mean 4.0 vs. 3.0; P <0.01), allocated more nondispensing hours for pharmacists (88% vs 60%; P <0.01), were more likely to employ a dedicated clinical pharmacist (20% vs 5%; P = 0.013), and hosted more pharmacy residents (78% vs 22%; P = 0.02). Years of pharmacy operation (P = 0.05) and pharmacy store type (P = 0.05) also were significantly associated with level of engagement. Neither prescription volume dispensed per week, number of hours of pharmacist overlap, nor hosting pharmacy students was statistically different between consistent and inconsistent pharmacies. Engagement in clinical activities in community pharmacy appears to improve with adequate staffing, availability of time for nondispensing activities, and having 1 or more

  17. 76 FR 55000 - Notice of Agricultural Management Assistance Organic Certification Cost-Share Program

    Science.gov (United States)

    2011-09-06

    ... Agricultural Marketing Service Notice of Agricultural Management Assistance Organic Certification Cost-Share... INFORMATION: This Organic Certification Cost-Share Program is part of the Agricultural Management Assistance... Applications from State Departments of Agriculture for the Agricultural Management Assistance Organic...

  18. 77 FR 43428 - Financial Management Service; Proposed Collection of Information: Minority Bank Deposit Program...

    Science.gov (United States)

    2012-07-24

    ... Fiscal Service Financial Management Service; Proposed Collection of Information: Minority Bank Deposit Program (MBDP) Certification Form for Admission AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and Request for comments. SUMMARY: The Financial Management Service, as part of...

  19. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Science.gov (United States)

    2010-07-01

    ... should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... have a mail manager? Every program level within a Federal agency that generates a significant quantity of outgoing mail should have its own mail manager. Each agency must decide which programs will have a...

  20. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    Science.gov (United States)

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  1. 76 FR 9028 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2011-02-16

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... operations. To this end, CDER is continuing its training program to give regulatory project managers the... managers, including a senior level regulatory project manager, can observe operations of pharmaceutical...

  2. 75 FR 10806 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2010-03-09

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... regulatory project managers, including a senior level regulatory project manager, can observe operations of... to provide an avenue for open dialogue. During the Site Tours Program, regulatory project managers...

  3. 49 CFR 192.911 - What are the elements of an integrity management program?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false What are the elements of an integrity management... Transmission Pipeline Integrity Management § 192.911 What are the elements of an integrity management program? An operator's initial integrity management program begins with a framework (see § 192.907) and...

  4. Reflections on Case Management in Youth Support Using a Program Example

    Science.gov (United States)

    Kennedy, Rosemary; Kennedy, Barry

    2010-01-01

    Using Moxley's (1997) program development framework as an agenda for a dialogue that juxtaposes an academic perspective with that of a seasoned youth program manager, this paper focuses on the relatively unexplored terrain of case management programs. In doing so, it exposes the convergences and divergences between academic and program manager…

  5. Implementation of an integrated pharmacy supply management strategy.

    Science.gov (United States)

    Amerine, Lindsey B; Calvert, Daniel R; Pappas, Ashley L; Lee, Sarah M; Valgus, John M; Savage, Scott W

    2017-12-15

    Implementation of an integrated pharmacy supply management strategy is described. In 2011, the formulary approval process and supply management for oncology medications were independent of each other at an oncology infusion center. Numerous nonformulary medications were kept on hand and reordered based on inventory levels that were established with inadequate usage information, while some formulary agents did not have on-hand inventory levels and had to be reordered on a patient-specific basis, which required paperwork and then a review by drug information staff per institutional policy. Because there was no true distinction in the ordering of formulary versus nonformulary oncology agents, the medical staff prescribed both in the same manner, leaving the pharmacy staff responsible for ensuring that enough quantities were on hand for many drugs, regardless of formulary status. Using supply chain management principles, a formal analysis of the on-hand inventory was performed. In addition, the formulary process for oncology drugs was restructured to align with how oncology drugs are managed for on-hand inventory levels. The alignment of these processes allowed the operation to have 1 supply strategy for the ambulatory oncology infusion center. As a result, inventory exhaustion rates were reduced by 70% and inventory turn rates improved by 78%. There was also significant time savings in the operational process streamlining, eliminating the rework and inefficiencies caused by an unclear process that was not fully captured in this assessment. Alignment of the formulary review process with inventory analyses that support supply management principles reduced inventory exhaustion while improving inventory turn rates. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  6. Associative programming language and virtual associative access manager

    Science.gov (United States)

    Price, C.

    1978-01-01

    APL provides convenient associative data manipulation functions in a high level language. Six statements were added to PL/1 via a preprocessor: CREATE, INSERT, FIND, FOR EACH, REMOVE, and DELETE. They allow complete control of all data base operations. During execution, data base management programs perform the functions required to support the APL language. VAAM is the data base management system designed to support the APL language. APL/VAAM is used by CADANCE, an interactive graphic computer system. VAAM is designed to support heavily referenced files. Virtual memory files, which utilize the paging mechanism of the operating system, are used. VAAM supports a full network data structure. The two basic blocks in a VAAM file are entities and sets. Entities are the basic information element and correspond to PL/1 based structures defined by the user. Sets contain the relationship information and are implemented as arrays.

  7. Aquatic Plant Management Program current status and seasonal workplan

    Energy Technology Data Exchange (ETDEWEB)

    Burns, E.R.; Bates, A.L.; Webb, D.H.

    1993-07-01

    The objective of the TVA Aquatic Plant Management Program is to support in an environmentally and economically responsible manner, the balanced multiple uses of the water resource of the Tennessee Valley. This is accomplished by following an integrated approach to prevent introduction and spread of noxious species, documenting occurrence and spread of existing species, and suppressing or eliminating problems in designated high use areas. It is not the TVA objective, nor is it biologically feasible and prudent to eliminate all aquatic vegetation. Aerial photography, helicopter reconnaissance, and field surveys are used to assess distributions and abundance of various aquatic macrophytes. Water level fluctuations are supplemented by herbicide applications to control undesirable vegetation. Investigations are conducted to evaluate water level fluctuation schemes, as well as biological, mechanical, and alternative chemical control techniques which offer potential for more environmentally compatible and cost-effective management operations.

  8. Integrating medical management with diabetes self-management training: a randomized control trial of the Diabetes Outpatient Intensive Treatment program

    National Research Council Canada - National Science Library

    Polonsky, William H; Earles, Jay; Smith, Susan; Pease, Donna J; Macmillan, Mary; Christensen, Reed; Taylor, Thomas; Dickert, Judy; Jackson, Richard A

    2003-01-01

    This study evaluated the Diabetes Outpatient Intensive Treatment (DOIT) program, a multiday group education and skills training experience combined with daily medical management, followed by case management over 6 months...

  9. Program MAMO: Models for avian management optimization-user guide

    Science.gov (United States)

    Guillaumet, Alban; Paxton, Eben H.

    2017-01-01

    The following chapters describe the structure and code of MAMO, and walk the reader through running the different components of the program with sample data. This manual should be used alongside a computer running R, so that the reader can copy and paste code into R, observe the output, and follow along interactively. Taken together, chapters 2–4 will allow the user to replicate a simulation study investigating the consequences of climate change and two potential management actions on the population dynamics of a vulnerable and iconic Hawaiian forest bird, the ‘I‘iwi (Drepanis coccinea; hereafter IIWI).

  10. Decision support program for congestion management using demand side flexibility

    DEFF Research Database (Denmark)

    Esmat, Ayman; Pinson, Pierre; Usaola, Julio

    2017-01-01

    In the past decades, Distribution System Operators (DSOs) have been mitigating distribution networks (DNs) contingencies by opting to grid reinforcements. However, this approach is not always cost and time efficient. Demand Side Flexibility (DSF) is one of the recent alternatives used in DNs...... congestion management. Consequently, new market players such as aggregators are needed to handle DSF transaction between customers and DSOs. This paper proposes and models a decision support program (DSP) to optimize the total cost charged by the DSO for using DSF services. Moreover, the energy rebound...

  11. Augmenting Space Technology Program Management with Secure Cloud & Mobile Services

    Science.gov (United States)

    Hodson, Robert F.; Munk, Christopher; Helble, Adelle; Press, Martin T.; George, Cory; Johnson, David

    2017-01-01

    The National Aeronautics and Space Administration (NASA) Game Changing Development (GCD) program manages technology projects across all NASA centers and reports to NASA headquarters regularly on progress. Program stakeholders expect an up-to-date, accurate status and often have questions about the program's portfolio that requires a timely response. Historically, reporting, data collection, and analysis were done with manual processes that were inefficient and prone to error. To address these issues, GCD set out to develop a new business automation solution. In doing this, the program wanted to leverage the latest information technology platforms and decided to utilize traditional systems along with new cloud-based web services and gaming technology for a novel and interactive user environment. The team also set out to develop a mobile solution for anytime information access. This paper discusses a solution to these challenging goals and how the GCD team succeeded in developing and deploying such a system. The architecture and approach taken has proven to be effective and robust and can serve as a model for others looking to develop secure interactive mobile business solutions for government or enterprise business automation.

  12. High-level waste management technology program plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  13. An Analysis of the Relationship Between the Professionalism of Defense Acquisition Program Managers and Program Outcomes

    Science.gov (United States)

    2011-11-30

    manager’s job: Folklore and fact . Harvard Business Review, 53(4), 49–61. Mohr, L. (1995). Impact analysis for social evaluation (2nd ed.). Thousand...and Mintzberg (1975) documented the attributes and competencies of effective managers. B. Fox’s Studies J. Ronald Fox’s two books (1974, 1988...significantly better than those of other components. In almost no cases, however, was this relationship evident. In fact , outcomes of Army programs

  14. An epidemiologic perspective on a case management program.

    Science.gov (United States)

    Kahler, Deborah; Salber, Patricia; Wilson, Thomas

    2010-01-01

    to improve a case management (CM) program using the principles and tools of epidemiology. Specifically, to use epidemiology to describe the population being managed, to analyze factors influencing outcomes, to assess the degree to which the CM process (or intervention) is related to those outcomes, to utilize the findings in order to make recommendations (to take action) for both better evaluation and improved and more efficient CM process, to provide an estimate of the impact of the CM program based on the comparison of pre-CM and post-CM interventions, and finally to discuss the caveat that pre-CM period probably does not provide a prediction of patterns to be expected in the post-CM period had CM not been present (an ideal, but difficult-to-find referent population for this kind of effectiveness analysis). a Medicare Advantage health plan. there were a total of 12,185 individuals who met the continuous enrollment requirement of 6 months (28 days) prior to initial contact with the CM department and 6 months after the contact date: 53% were female; the average age was 73.9 (standard deviation = ± 9.5). There was a linear relationship between the average "dose" of CM-as measured by the number of times a case manager had contact with a case-and the risk profile of the case-as measured by a standard risk assessment tool provided by the Centers for Medicare & Medicaid Services. The month-to-month costs for the study population prior to CM showed a sharp rise in the month prior to the initial contact with CM and a sharp decline beginning before the contact. This pattern was consistent across different risk profiles and our operational definition of CM "dose."The average costs 6 months prior to CM were higher than the average costs 6 months after the CM. The difference in cost varied by "dose" category. When coupled with the number of cases per dosage category, the greatest value for the CM program was in the management of moderate risk cases called two to four times

  15. Designing and managing successful endangered species recovery programs

    Science.gov (United States)

    Clark, Tim W.; Crete, Ron; Cada, John

    1989-03-01

    Endangered species recovery is characterized by complexity and uncertainty in both its biological and organizational aspects. To improve performance in the organizational dimension, some models of organizations are briefly introduced with an emphasis on the organization as a system for processing information, i.e., for successfully dealing with the high uncertainty in the task environment. A strong task orientation,which rewards achievement of the primary goal, is suggested as ideal for this task, as is generative rationality, which encourages workers to observe, critique, and generate new ideas. The parallel organization—a flexible, participatory, problem-solving structure set up alongside traditional bureaucracies—is offered as a useful structure for meeting the demands of uncertainties encountered during recovery. Task forces and projects teams can be set up as parallel organizations. Improved managerial functions include coordinating roles to facilitate the flow and use of information; decision making to avoid “groupthink”—the defects, symptoms, and countermeasures are described; and productive, active management of the inevitable conflict. The inability of organizations to solve dilemmas, to examine their own structures and management, and to change themselves for more effective, efficient, and equitable performance is seen as the major obstacle to improved recovery programs. Some recommendations for effecting change in bureaucracies are made along with a call for case studies detailing the organizational dimensions of endangered species recovery programs.

  16. A successful physician training program in cholesterol screening and management.

    Science.gov (United States)

    Jack, B W; Gans, K M; McQuade, W; Culpepper, L; Lasswell, A; Hume, A L; Dowling, P T; Carleton, R A

    1991-05-01

    Thirty-six resident physicians received a blood cholesterol training program which included training in blood cholesterol screening using a fingerstick method and a desktop analyzer, diet assessment and counseling, and a management protocol for follow-up diet and drug treatment. The program also included feedback to residents about their blood cholesterol screening activity, incentives, and biweekly articles in the department newsletter. Between 1986-1987 (baseline) and 1987-1988 (intervention), the percentage of the target patient population (ages 20-65 years, nonpregnant, not screened in the previous year) that was screened for hypercholesterolemia in this primary care practice increased from 16.2 to 23.2% [rate difference (RD) = 7.0; 95% confidence interval (CI) = 4.75-9.25]. The mean value of the screening tests decreased from 5.36 mmol/liter (207.2 mg/dl) to 5.08 mmol/liter (196.6 mg/dl; t = 2.98, P = 0.003) and the percentage of the population screened needing further evaluation decreased from 36.8 to 27.6% (RD 9.2; CI = 2.00-14.00). In the intervention year, compared with the baseline year, patients with a borderline blood cholesterol and cardiovascular risk factors were more likely to have a follow-up test (28.8% vs 11.9%, RD = 16.9; 95% CI = 0.80-33.00) and the low-density lipoprotein cholesterol test was used less for screening (8.2% vs 19.4%, P less than 0.0001). Conclusion. We conclude that this program was effectively integrated into a busy primary care practice, leading to improvement in blood cholesterol screening and management practices.

  17. An ethical leadership program for nursing unit managers.

    Science.gov (United States)

    Jeon, Sang Hee; Park, Mihyun; Choi, Kyungok; Kim, Mi Kyoung

    2017-12-19

    The aims of this study were to evaluate the effect of an ethical leadership program (ELP) on ethical leadership, organizational citizenship behavior (OCB), and job outcomes of nursing unit managers (UMs) and to examine changes in staff nurses' perception about UMs' EL, OCB, job outcomes, and ethical work environments (EWEs) post-ELP. A quasi-experimental (pre- and post-test design) study conducted six-month intervention (ELP) using self-reported UM survey (n=44), and staff nurses (n=158) were randomly extracted by two steps. The Korean version of Ethical Leadership at Work for UMs' self-ethical leadership, the Ethical Leadership Scale for staff nurses' perceived ethical leadership, a 19-item OCB scale, and six dimensions of the medium-sized Copenhagen Psychosocial Questionnaire II for job outcomes and EWEs were administered at baseline and post-intervention. UMs' ethical leadership scores differed significantly over time in people orientation (p=0.041) and concern for ethical leadership sustainability (p=0.002) adjusting for UM experience duration and nursing unit type. Total mean and level of power-sharing of ethical leadership among UMs with <5years of UM experience improved significantly over time. Of staff nurses' perception changes about UMs' ethical leadership, OCB, job outcomes, and EWEs, significant improvement over time appeared only in EWEs' work influence level (p=0.007). This study provides useful information for clinical ELP development and examining the program's effect on leadership skills and followers' outcomes. Program facilitation relies on practical training methods, participant motivation, and assessment outcome designs by controlling clinical confounding factors. Findings have implications as an attempt for intervention to promote competencies related to ethical leadership of nursing unit managers. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Program-target methods of management small business

    Directory of Open Access Journals (Sweden)

    Gurova Ekaterina

    2017-01-01

    Full Text Available Experience of small businesses in Russia are just beginning their path to development. difficulties arise with the involvement of small businesses in the implementation of government development programmes. Small business in modern conditions to secure a visible prospect of development without the implementation of state support programmes. Ways and methods of regulation of development of the market economy are diverse. The total mass of the huge role is played by the program-target methods of regulation. The article describes the basic principles on the use of program-target approach to the development of a specific sector of the economy, as small businesses, designed to play an important role in getting the national economy out of crisis. The material in this publication is built from the need to maintain the connection between the theory of government regulation, practice of formation of development programs at the regional level and the needs of small businesses. Essential for the formation of entrepreneurship development programmes is to preserve the flexibility of small businesses in making management decisions related to the selection and change of activities.

  19. Educational program for the prevention and management of school violence

    Directory of Open Access Journals (Sweden)

    Viriam Leiva Díaz

    2013-04-01

    Full Text Available This article presents the main results of the implementation of an educational program for the preventionand management of violence in public schools by teachers of first and second cycle, the program was taught bythe School of Nursing at the University of Costa Rica, with a total of 40 hours from January to February 2011. Weused various teaching strategies based on the educational needs of this group of teachers, which were shown in aprevious study and application of a needs assessment. Attended by 33 teachers, 32 women and one man. Of theparticipants, 30 completed the program. The main results are as follows: participants were able to acquire, buildor improve their knowledge about the prevention and treatment of school violence, and also learned varioustechniques and strategies for prevention and control of violence in schools. It is concluded that success inachieving the goals set for each of the sessions is directly related to the fact that the entire educational programstuck to the educational needs expressed by the participating population and its characteristics as teachers, usingprinciples of andragogy, which allowed understanding learning as a knowledge sharing among stakeholders

  20. The NASA cryogenic fluid management technology program plan

    Science.gov (United States)

    Faddoul, James R.; Mcintyre, Stanley D.

    1991-01-01

    During the past three decades, NASA has been designing and using large quantities of cryogenic fluids for propulsion system propellants, coolants for experiments, and for environmental control systems. As a consequence, an erroneous conclusion has been drawn that the technology exists for using large quantities of cryogens in space for long periods of time. The attempt here is to dispel that myth and to present the technology needs that require development in order to support the NASA programs of the future. A NASA program, developed through the impetus of the Marshall Space Flight Center and the Lewis Research Center and supported by all NASA centers is outlined. The current state of the art is discussed along with specific needs for near future missions. Then, using the Space Exploration Initiative mission set, cost/benefit projections are made for the development of advanced cryogenic fluid management techniques. Earth based and space based test programs are discussed relative to the technology requirements for liquid storage, supply, and transfer for fluid transfer and advanced instrumentation.

  1. 41 CFR 109-1.5002 - Personal property management program objectives.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Personal property management program objectives. 109-1.5002 Section 109-1.5002 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS...

  2. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities. This Part 2 includes chapters on implementation guidance for operational configuration management, implementation guidance for design reconstitution, and implementation guidance for material condition and aging management. Appendices are included on design control, examples of design information, conduct of walkdowns, and content of design information summaries.

  3. Implementation and evaluation of a nursing home fall management program.

    Science.gov (United States)

    Rask, Kimberly; Parmelee, Patricia A; Taylor, Jo A; Green, Diane; Brown, Holly; Hawley, Jonathan; Schild, Laura; Strothers, Harry S; Ouslander, Joseph G

    2007-03-01

    To evaluate the feasibility and effectiveness of a falls management program (FMP) for nursing homes (NHs). A quality improvement project with data collection throughout FMP implementation. NHs in Georgia owned and operated by a single nonprofit organization. All residents of participating NHs. A convenience sample of 19 NHs implemented the FMP. The FMP is a multifaceted quality improvement and culture change intervention. Key components included organizational leadership buy-in and support, a designated facility-based falls coordinator and interdisciplinary team, intensive education and training, and ongoing consultation and oversight by advanced practice nurses with expertise in falls management. Process-of-care documentation using a detailed 24-item audit tool and fall and physical restraint use rates derived from quality improvement software currently used in all Georgia NHs (MyInnerView). Care process documentation related to the assessment and management of fall risk improved significantly during implementation of the FMP. Restraint use decreased substantially during the project period, from 7.9% to 4.4% in the intervention NHs (a relative reduction of 44%), and decreased in the nonintervention NHs from 7.0% to 4.9% (a relative reduction of 30%). Fall rates remained stable in the intervention NHs (17.3 falls/100 residents per month at start and 16.4 falls/100 residents per month at end), whereas fall rates increased 26% in the NHs not implementing the FMP (from 15.0 falls/100 residents/per month to 18.9 falls/100 residents per month). Implementation was associated with significantly improved care process documentation and a stable fall rate during a period of substantial reduction in the use of physical restraints. In contrast, fall rates increased in NHs owned by the same organization that did not implement the FMP. The FMP may be a helpful tool for NHs to manage fall risk while attempting to reduce physical restraint use in response to the Centers for

  4. Evidence, models, conservation programs and limits to management

    Science.gov (United States)

    Nichols, J.D.

    2012-01-01

    Walsh et al. (2012) emphasized the importance of obtaining evidence to assess the effects of management actions on state variables relevant to objectives of conservation programs. They focused on malleefowl Leipoa ocellata, ground-dwelling Australian megapodes listed as vulnerable. They noted that although fox Vulpes vulpes baiting is the main management action used in malleefowl conservation throughout southern Australia, evidence of the effectiveness of this action is limited and currently debated. Walsh et al. (2012) then used data from 64 sites monitored for malleefowl and foxes over 23 years to assess key functional relationships relevant to fox control as a conservation action for malleefowl. In one set of analyses, Walsh et al. (2012) focused on two relationships: fox baiting investment versus fox presence, and fox presence versus malleefowl population size and rate of population change. Results led to the counterintuitive conclusion that increases in investments in fox control produced slight decreases in malleefowl population size and growth. In a second set of analyses, Walsh et al. (2012) directly assessed the relationship between investment in fox baiting and malleefowl population size and rate of population change. This set of analyses showed no significant relationship between investment in fox population control and malleefowl population growth. Both sets of analyses benefited from the incorporation of key environmental covariates hypothesized to influence these management relationships. Walsh et al. (2012) concluded that "in most situations, malleefowl conservation did not effectively benefit from fox baiting at current levels of investment." In this commentary, I discuss the work of Walsh et al. (2012) using the conceptual framework of structured decision making (SDM). In doing so, I accept their analytic results and associated conclusions as accurate and discuss basic ideas about evidence, conservation and limits to management.

  5. Guidebook for Farmstead Demand-Side Management (DSM) program design

    Energy Technology Data Exchange (ETDEWEB)

    Rose, M.; Camera, R.K.

    1992-02-21

    The acceptance and growth of Demand-Side Management (DSM) continues to increase in the US. According to latest estimates, total expenditures on electric utility DSM programs now exceed $1.2 billion annually, with these investments ranging from 1 to 5 percent of a utility's gross revenues. In addition, due to increasing environmental concerns and the high cost of new capacity, these expenditure levels are expected to increase. While the vast majority of these DSM programs are directed at the more traditional residential, commercial and industrial market sectors, significant opportunities still exist. One market segment that has not been the focus of attention but a critical sector from an economic development perspective for marry utilities -- is the agricultural and farmstead market. Although the total number of farms in the United States decreased by approximately 5 percent between 1985 and 1989, the land dedicated to farming still accounts for over 995 million acres. Furthermore, the total value of farm output in the United States has been steadily increasing since 1986. The limited penetration of energy efficiency measures in farmsteads provides an excellent opportunity for utilities to expand their DSM programming efforts to capture this non-traditional'' market segment, and at the same time assist farms in increasing their efficiency and competitiveness. In marry states, and, in particular New York State, agriculture plays a major economic role. The importance of farms not only from a utility perspective but also from a state and federal perspective cannot be overstated. As such, utilities are in a unique position to facilitate farmstead DSM technology investments in an effort to benefit the farmer (and his profitability), the utility, the state and the country. This guidebook is designed to provide the framework for agricultural demand planning, including market assessment, technology assessment, market penetration analysis and program design.

  6. Shared financial management of Community programs and its implementation in the EU area

    OpenAIRE

    Jedličková, Vladislava

    2008-01-01

    The issue of migration within the European Union has grown in member countries to considerable size. Management representatives of EU institutions have decided to address this situation. They established community program Solidarity and management of migration flows. The European Commission has decided that for the financial management of this program will be used the principle of shared management. The principle of shared financial management is the delegation of powers and responsibilities ...

  7. Classroom management programs for deaf children in state residential and large public schools.

    Science.gov (United States)

    Wenkus, M; Rittenhouse, B; Dancer, J

    1999-12-01

    Personnel in 4 randomly selected state residential schools for the deaf and 3 randomly selected large public schools with programs for the deaf were surveyed to assess the types of management or disciplinary programs and strategies currently in use with deaf students and the rated effectiveness of such programs. Several behavioral management programs were identified by respondents, with Assertive Discipline most often listed. Ratings of program effectiveness were generally above average on a number of qualitative criteria.

  8. The impact of middle manager affective commitment on perceived improvement program implementation success.

    Science.gov (United States)

    Fryer, Ashley-Kay; Tucker, Anita L; Singer, Sara J

    2017-07-03

    Recent literature suggests that middle manager affective commitment (emotional attachment, identification, and involvement) to an improvement program may influence implementation success. However, less is known about the interplay between middle manager affective commitment and frontline worker commitment, another important driver of implementation success. We contribute to this research by surveying middle managers who directly manage frontline workers on nursing units. We assess how middle manager affective commitment is related to their perceptions of implementation success and whether their perceptions of frontline worker support mediate this relationship. We also test whether a set of organizational support factors foster middle manager affective commitment. We adapt survey measures of manager affective commitment to our research context of hospitals. We surveyed 67 nurse managers from 19 U.S. hospitals. We use hierarchical linear regression to assess relationships among middle manager affective commitment to their units' falls reduction program and their perceptions of three constructs related to the program: frontline worker support, organizational support, and implementation success. Middle manager affective commitment to their unit's falls reduction program is positively associated with their perception of implementation success. This relationship is mediated by their perception of frontline worker support for the falls program. Moreover, middle managers' affective commitment to their unit's falls program mediates the relationship between perceived organizational support for the program and perceived implementation success. We, through this research, offer an important contribution by providing empirical support of factors that may influence successful implementation of an improvement program: middle manager affective commitment, frontline worker support, and organizational support for an improvement program. Increasing levels of middle manager affective

  9. 36 CFR 1210.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-07-01

    ... Financial and Program Management § 1210.20 Purpose of financial and program management. Sections 1210.21 through 1210.28 prescribe standards for financial management systems, methods for making payments and... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Purpose of financial and...

  10. 10 CFR 600.310 - Purpose of financial and program management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose of financial and program management. 600.310... Requirements § 600.310 Purpose of financial and program management. Sections 600.311 through 600.318 prescribe standards for financial management systems; methods for making payments; and rules for cost sharing and...

  11. 28 CFR 70.20 - Purpose of financial and program management.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards for financial management systems, methods for making payments and rules for: Satisfying cost sharing and...

  12. 14 CFR 1260.120 - Purpose of financial and program management.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Purpose of financial and program management... Requirements § 1260.120 Purpose of financial and program management. Sections 1260.121 through 1260.128 prescribe standards for financial management systems, methods for making payments and rules for: satisfying...

  13. 77 FR 55843 - Office of Facilities Management and Program Services; Submission for OMB Review; Background...

    Science.gov (United States)

    2012-09-11

    ... ADMINISTRATION Office of Facilities Management and Program Services; Submission for OMB Review; Background Investigations for Child Care Workers AGENCY: Office of Facilities Management and Program Services, Public... Act, the Regulatory Secretariat will be submitting to the Office of Management and Budget (OMB) a...

  14. 77 FR 31017 - Office of Facilities Management and Program Services; Information Collection; Background...

    Science.gov (United States)

    2012-05-24

    ...; Sequence 7] Office of Facilities Management and Program Services; Information Collection; Background Investigations for Child Care Workers AGENCY: Office of Facilities Management and Program Services, Public... Act, the Regulatory Secretariat will be submitting to the Office of Management and Budget (OMB) a...

  15. Posture Management Program Based on Theory of Planned Behavior for Adolescents with Mild Idiopathic Scoliosis

    Directory of Open Access Journals (Sweden)

    Jihea Choi, PhD, RN, CPNP

    2013-09-01

    Conclusion: The results indicate that the posture management program is effective in maintaining posture management behavior in adolescents with mild idiopathic scoliosis for both cognitive and physical outcomes. The posture management program should be helpful in expanding the role of school nurses in improving the health status of adolescents with mild idiopathic scoliosis.

  16. 76 FR 18220 - Labor-Management Cooperation Grant Program Information Collection Request

    Science.gov (United States)

    2011-04-01

    ... CONCILIATION SERVICE Labor-Management Cooperation Grant Program Information Collection Request AGENCY: Federal... information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in...-Management Cooperation Grant Program Information Collection Request'' (OMB Control No. 3076-0006) will be...

  17. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false OPM authority to review personnel management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review...

  18. 78 FR 43810 - State of Kansas; Authorization of State Hazardous Waste Management Program

    Science.gov (United States)

    2013-07-22

    ... AGENCY 40 CFR Part 271 State of Kansas; Authorization of State Hazardous Waste Management Program AGENCY... authorization on October 17, 1985 (50 FR 40377), to implement its Base Hazardous Waste Management program... Administrative Regulations, Article 31--Hazardous Waste Management, effective May 10, 2013. The State's...

  19. 76 FR 37021 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-06-24

    ... AGENCY 40 CFR Part 271 Louisiana: Final Authorization of State Hazardous Waste Management Program..., (50 FR 3348), to implement its base Hazardous Waste Management Program. We granted authorization for... opportunity to apply for final authorization to operate all aspects of their hazardous waste management...

  20. 75 FR 54591 - Notice of Agricultural Management Assistance Organic Certification Cost-Share Program

    Science.gov (United States)

    2010-09-08

    ... Agricultural Marketing Service Notice of Agricultural Management Assistance Organic Certification Cost-Share... Applications for the Agricultural Management Assistance Organic Certification Cost-Share Program. SUMMARY: This... the Agricultural Management Assistance (AMA) Program. Total amount of cost-share payments provided to...

  1. 77 FR 10538 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2012-02-22

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... is continuing its training program to give regulatory project managers the opportunity to tour..., over a 2- to 3-day period, small groups (five or less) of regulatory project managers, including a...

  2. Economic efficiency and risk character of fire management programs, Northern Rocky Mountains

    Science.gov (United States)

    Thomas J. Mills; Frederick W. Bratten

    1988-01-01

    Economic efficiency and risk have long been considered during the selection of fire management programs and the design of fire management polices. The risk considerations was largely subjective, however, and efficiency has only recently been calculated for selected portions of the fire management program. The highly stochastic behavior of the fire system and the high...

  3. 77 FR 29275 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2012-05-17

    ... AGENCY 40 CFR Part 272 Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program... in the regulations entitled ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The EPA will incorporate by reference into the Code of Federal...

  4. 75 FR 36609 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-06-28

    ... AGENCY 40 CFR Part 272 Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program... in the regulations entitled ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The EPA will incorporate by reference into the Code of Federal...

  5. 77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ... AGENCY 40 CFR Part 272 Idaho: Incorporation by Reference of Approved State Hazardous Waste Management... codify in the regulations entitled ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA ] proposes to revise the codification of Idaho's program to...

  6. 77 FR 3224 - New Mexico: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2012-01-23

    ...; FRL-9613-5] New Mexico: Incorporation by Reference of State Hazardous Waste Management Program AGENCY... regulations entitled ``Approved State Hazardous Waste Management Programs,'' New Mexico's authorized hazardous waste program. The EPA will incorporate by reference into the Code of Federal Regulations (CFR) those...

  7. 75 FR 45583 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-03

    ... AGENCY 40 CFR Part 272 New York: Incorporation by Reference of State Hazardous Waste Management Program... the codification of New York's authorized hazardous waste program which is set forth in the regulations entitled ``Approved State Hazardous Waste Management Programs'', New York's authorized hazardous...

  8. 77 FR 46994 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2012-08-07

    ... AGENCY 40 CFR Part 272 Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program... in the regulations entitled ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The EPA will incorporate by reference into the Code of Federal...

  9. 40 CFR 501.11 - Elements of a sludge management program submission.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Elements of a sludge management program submission. 501.11 Section 501.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Programs § 501.11 Elements of a sludge management program submission. (a) Any State that seeks to...

  10. 75 FR 69399 - Evaluation of State Coastal Management Programs and National Estuarine Research Reserves

    Science.gov (United States)

    2010-11-12

    ... Coastal Resources Management Program evaluation site visit will be held January 3-7, 2011. One public... Program. Please direct written comments to Kate Barba, Chief, National Policy and Evaluation Division... National Oceanic and Atmospheric Administration Evaluation of State Coastal Management Programs and...

  11. Interviewing Key Informants: Strategic Planning for a Global Public Health Management Program

    Science.gov (United States)

    Kun, Karen E.; Kassim, Anisa; Howze, Elizabeth; MacDonald, Goldie

    2013-01-01

    The Centers for Disease Control and Prevention's Sustainable Management Development Program (SMDP) partners with low- and middle-resource countries to develop management capacity so that effective global public health programs can be implemented and better health outcomes can be achieved. The program's impact however, was variable. Hence, there…

  12. Implementation of the Air Program Information Management System (APIMS) Inspection Module

    Science.gov (United States)

    2009-05-01

    7 5 T H A I R B A S E W I N G Implementation of the Air Program Information Management System (APIMS) Inspection Module 2009 Environment...Implementation of the Air Program Information Management System (APIMS) Inspection Module 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  13. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Area Power Administration Application of the Energy Planning and Management Program Power Marketing... (Western), a Federal power marketing agency of the Department of Energy (DOE), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as modified in this notice, to...

  14. A Triage Approach to Managing a Two Year Wait-List in a Chronic Pain Program

    Directory of Open Access Journals (Sweden)

    Alexander J Clark

    2005-01-01

    Full Text Available OBJECTIVE: Individuals with chronic pain referred to specialist chronic pain management programs frequently wait months to years for assessment and care. In the authors' pain management program, approximately 600 patients are on the waiting list. An innovative recommendation program to encourage and educate referring physicians to continue active care of pain during this waiting period was developed.

  15. Fault Management Technology Maturation for NASA's Constellation Program

    Science.gov (United States)

    Waterman, Robert D.

    2010-01-01

    This slide presentation reviews the maturation of fault management technology in preparation for the Constellation Program. There is a review of the Space Shuttle Main Engine (SSME) and a discussion of a couple of incidents with the shuttle main engine and tanking that indicated the necessity for predictive maintenance. Included is a review of the planned Ares I-X Ground Diagnostic Prototype (GDP) and further information about detection and isolation of faults using Testability Engineering and Maintenance System (TEAMS). Another system that being readied for use that detects anomalies, the Inductive Monitoring System (IMS). The IMS automatically learns how the system behaves and alerts operations it the current behavior is anomalous. The comparison of STS-83 and STS-107 (i.e., the Columbia accident) is shown as an example of the anomaly detection capabilities.

  16. HVAC system optimization for energy management by evolutionary programming

    Energy Technology Data Exchange (ETDEWEB)

    Fong, K.F.; Chow, T.T. [City University of Hong Kong, Kowloon (China). Division of Building Science and Technology; Hanby, V.I. [De Montfort Univ., Leicester (United Kingdom). Inst. of Energy and Sustainable Development

    2006-03-15

    Energy management of heating, ventilating and air-conditioning (HVAC) systems is a primary concern in building projects, since the energy consumption in electricity has the highest percentage in HVAC among all building services installations and electric appliances. Without sacrifice of thermal comfort, to reset the suitable operating parameters, such as the chilled water temperature and supply air temperature, would have energy saving with immediate effect. For the typical commercial building projects, it is not difficult to acquire the reference settings for efficient operation. However, for some special projects, due to the specific design and control of the HVAC system, conventional settings may not be necessarily energy-efficient in daily operation. In this paper, the simulation-optimization approach was proposed for the effective energy management of HVAC system. Due to the complicated interrelationship of the entire HVAC system, which commonly includes the water side and air side systems, it is necessary to suggest optimum settings for different operations in response to the dynamic cooling loads and changing weather conditions throughout a year. A metaheuristic simulation-EP (evolutionary programming) coupling approach was developed using evolutionary programming, which can effectively handle the discrete, non-linear and highly constrained optimization problems, such as those related to HVAC systems. The effectiveness of this simulation-EP coupling suite was demonstrated through the establishment of a monthly optimum reset scheme for both the chilled water and supply air temperatures of the HVAC installations of a local project. This reset scheme would have a saving potential of about 7% as compared to the existing operational settings, without any extra cost. (author)

  17. [Management of hemodialysis patients using simple informatics program].

    Science.gov (United States)

    Devcić, Bosiljka; Jelić, Ita; Racki, Sanjin

    2014-03-01

    Providing health care and good hospital organization are always based on a well-educated and competent nurse. Nurses can significantly affect the result of overall treatment, which has a professional and financial effect. Nursing Informatics is a specialty that integrates nursing, computer and information science applied to nursing management as well as transfer of data, information and knowledge in nursing practice. This facilitates nurses' integration in supporting decision-making and implementation of health care. Informatics emphasizes overall nursing practice and nurses should have basic computer skills. In this article, we show how the use of simple tables, designed by using Microsoft Office programs (Word and Excel), has been employed for over a decade in facilitating the organization of daily work, monitoring of patients and their prescribed therapy. A trained nurse-manager will be able to evaluate patient care and to organize health care administration using all human and technical resources. The vision of the national health care system is still not achievable due to the lack of infrastructure. Nurses and computer documentation of patients with chronic kidney disease can significantly improve the quality of patient care and treatment.

  18. Final Environmental assessment for the Uranium Lease Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  19. Waste Management Project Office Quality Assurance Program Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-12-10

    The Waste Management Project Office (WMPO) is the organization to which the US Department of Energy, Nevada Operations (DOE/NV), has assigned the responsibility of administering and coordinating the activities of the various Participating Organizations and of Nevada Test Site (NTS) Support Contractors working on the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The WMPO Quality Assurance Program Plan (QAPP), describes the policies and methods to be used by WMPO, by the DOE/NV matrix support, and by QASC personnel (also referred to as the WMPO staff) to conduct quality related activities in support of the NNWSI Project. This QAPP provides the quality assurance program plan to implement the NNWSI Project Quality Assurance (QA) Plan, NVO-196-17. It ensures that adequate quality assurance measures are applied and that records provide traceability for those activities of the NNWSI Project that are controlled directly by the WMPO staff. It is intended that the WMPO QAPP be used to supplement the NNWSI Project QAP for the control of such activities.

  20. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  1. Leadership development programs for health care middle managers: An exploration of the top management team member perspective.

    Science.gov (United States)

    Whaley, Alan; Gillis, William E

    Hospitals throughout the United States establish leadership and management programs for their middle managers. Despite their pervasiveness and an increased emphasis on physician leadership, there is limited research regarding the development programs designed for clinical and nonclinical health care middle managers. Using two theoretical lenses, signaling and institutional theory, this exploratory study investigates mid-sized hospital development programs from the perspective of top management team (TMT) members. Our objective is to find out what types of programs hospitals have, how they are developed, and how they are evaluated. We conducted semistructured interviews with 13 TMT members in six purposefully selected hospitals and matched these interviews with program curricula. Careful coding of the data allowed us not only to show our data in a meaningful visual representation but also to show the progression of the data from raw form to aggregate themes in the qualitative research process. We identified four types of development programs used in the selected hospitals: (a) ongoing series, (b) curriculum-based, (c) management orientation, and (d) mentoring. Challenges existed in aligning the need for the program with program content. Communication occurred both through direct messaging regarding policies and procedures and through hidden signals. TMT members referenced other programs for guidance but were not always clear about what it is they wanted the programs to accomplish. Finally, there was limited program outcome measurement. Our small sample indicates that specific, structured, and comprehensive programs perform best. The better programs were always trying to improve but that most needed better accountability of tracking outcomes. In setting up a program, a collaborative approach among TMT members to establish what the needs are and how to measure outcomes worked well. Successful programs also tied in their leadership development with overall employee

  2. 76 FR 81015 - Notice of Public Webinar on Implementation of Distribution Integrity Management Programs

    Science.gov (United States)

    2011-12-27

    ... Distribution Integrity Management Programs AGENCY: Pipeline and Hazardous Materials Safety Administration... have prepared and implemented distribution integrity management plans (DIMP) by August 2, 2011. Federal....regulations.gov including any personal information provided. Please see the Privacy Act statement immediately...

  3. 78 FR 5164 - Notice of Agricultural Management Assistance Organic Certification Cost-Share Program

    Science.gov (United States)

    2013-01-24

    ... Agricultural Marketing Service Notice of Agricultural Management Assistance Organic Certification Cost-Share... Applications From State Departments of Agriculture for the Agricultural Management Assistance Organic Certification Cost-Share Program. SUMMARY: This notice invites the following eligible States: Connecticut...

  4. Investigating the Optimal Management Strategy for a Healthcare Facility Maintenance Program

    National Research Council Canada - National Science Library

    Gaillard, Daria

    2004-01-01

    ...: strategic partnering with an equipment management firm. The objective of this study is to create a decision-model for selecting the optimal management strategy for a healthcare organization's facility maintenance program...

  5. Water Management Program: Unit Three, 1985 Prime Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual program describes the results of the 1984 water management program for Unit Three at Prime Hook National Wildlife Refuge and outlines the water regimen...

  6. Joint Logistics Commanders Guide for the Management of Joint Service Programs

    Science.gov (United States)

    1982-06-01

    Multiple Program Offices 6-2 in Program Office Organization 6-2 Personnel Selection 6-3 Personnel Evaluations 6-3 7. FINANCIAL MANAGEMENT 7-1...program issues —Reporting requirements (type, format, and fre- quency) —Project office organization and initial staffing —Requirement to establish...cen- tral program direction. Program Office Organization There are two basic alternatives for program office organization . One is to include on the

  7. A microcomputer-based tutorial program for computer-based training and patient care.

    Science.gov (United States)

    Hayes, J R; Menke, J A

    1985-04-01

    This program provides the nonprogrammer a tool to develop easily modified computer assisted tutorials, tests, and simulations with a word processor. In addition, by using the branching and query features of this program, one can easily develop text files that provide rapid access to information related to patient care such as neonatal formularies and patient care algorithms.

  8. A disease management program for heart failure: collaboration between a home care agency and a care management organization.

    Science.gov (United States)

    Gorski, Lisa A; Johnson, Kathy

    2003-01-01

    This article describes a collaborative approach to manage patients with heart failure between a home care agency and a care management agency. The resulting disease management program used a combination of home visits and phone contact. Care management plans emphasized patient education on increasing adherence to medical and diet regimens, and recognizing early symptoms of exacerbation that could lead to rehospitalization. Clinician activities and patient outcomes are described.

  9. A Test of the Effectiveness of Time Management Training in a Department of the Navy Program Management Office (PMO)

    Science.gov (United States)

    1977-05-01

    was sent to all potential participants in the project management office to explain the time management principles in some detail. it waa circulated...questions that asked for an approximation of time spent on various tasks associated with performing duties within the project management office . Also, the...memorandum invited interested members of the project management office to participate in a program that was designed to determine whether time man

  10. Open access to an outpatient intravenous diuresis program in a systolic heart failure disease management program.

    Science.gov (United States)

    Hebert, Kathy; Dias, Andre; Franco, Emiliana; Tamariz, Leonardo; Steen, Dylan; Arcement, Lee M

    2011-01-01

    In order to provide efficient utilization of resources in an outpatient setting for acute exacerbation of heart failure (HF), the authors piloted an open-access outpatient intravenous (IV) diuretic program (IVDP) to evaluate utilization in an HF disease management program (HFDMP), patient characteristics for users of the program, and safety. An outpatient HFDMP at Jackson Memorial Hospital in Miami, Florida, enrolling 577 patients 18 years and older with an ejection fraction ≤40% was implemented. For symptoms or weight gain ≥5 pounds, patients were eligible to use an open-access IVDP during clinic hours. A total of 130 HFDM patients (22.5%) used the IVDP. IVDP users were more likely to be diabetic, with lower body mass indices than non-IVDP users. New York Heart Association class IV patients and previously hospitalized patients were more likely to use the IVDP. There were no documented adverse reactions for patients receiving treatment and no difference in mortality between groups. This open-access outpatient IVDP model for patients with HF was readily utilized by the HFDMP participants and appears safe for use in this population. This unique model may provide alternative access for acute HF treatment. Congest Heart Fail. © 2011 Wiley Periodicals, Inc.

  11. Cost-Effectiveness of Multidisciplinary Management Program and Exercise Training Program in Heart Failure.

    Science.gov (United States)

    Dang, Weixiong; Yi, Anji; Jhamnani, Sunny; Wang, Shi-Yi

    2017-10-15

    Heart failure causes significant health and financial burdens for patients and society. Multidisciplinary management program (MMP) and exercise training program (ETP) have been reported as cost-effective in improving health outcomes, yet no study has compared the 2 programs. We constructed a Markov model to simulate life year (LY) gained and total costs in usual care (UC), MMP, and ETP. The probability of transitions between states and healthcare costs were extracted from previous literature. We calculated the incremental cost-effectiveness ratio (ICER) over a 10-year horizon. Model robustness was assessed through 1-way and probabilistic sensitivity analyses. The expected LY for patients treated with UC, MMP, and ETP was 7.6, 8.2, and 8.4 years, respectively. From a societal perspective, the expected cost of MMP was $20,695, slightly higher than the cost of UC ($20,092). The cost of ETP was much higher ($48,378) because of its high implementation expense and the wage loss it incurred. The ICER of MMP versus UC was $976 per LY gained, and the ICER of ETP versus MMP was $165,702 per LY gained. The results indicated that, under current cost-effectiveness threshold, MMP is cost-effective compared with UC, and ETP is not cost-effective compared with MMP. However, ETP is cost-effective compared with MMP from a healthcare payer's perspective. Copyright © 2017 Elsevier Inc. All rights reserved.

  12. Program information architecture/document hierarchy. [Information Management Systems, it's components and rationale

    Energy Technology Data Exchange (ETDEWEB)

    Woods, T.W.

    1991-09-01

    The Nuclear Waste Management System (NWMS) Management Systems Improvement Strategy (MSIS) (DOE 1990) requires that the information within the computer program and information management system be ordered into a precedence hierarchy for consistency. Therefore, the US Department of Energy (DOE). Office of Civilian Radioactive Waste Management (OCRWM) requested Westinghouse Hanford Company to develop a plan for NWMS program information which the MSIS calls a document hierarchy. This report provides the results of that effort and describes the management system as a program information architecture.'' 3 refs., 3 figs.

  13. Diffusion of innovation I: Formulary acceptance rates of new drugs in teaching and non-teaching British Columbia hospitals--a hospital pharmacy perspective.

    Science.gov (United States)

    D'Sa, M M; Hill, D S; Stratton, T P

    1994-12-01

    Lag times in the diffusion of new drugs in the hospital setting have both patient care and pharmaceutical industry implications. This two-part series uses diffusion theory to examine differences in the adoption rates of new drugs in British Columbia teaching and non-teaching hospitals. Formulary addition of a new drug by a hospital's Pharmacy and Therapeutics Committee was considered the adoption indicator. Time for adoption was defined as the difference between a drug's Canadian market approval date and the date of formulary addition. Surveys were mailed in September 1990 to 41 hospital pharmacies (response rate = 88%), asking respondents to provide formulary inclusion dates of 29 drugs marketed between July 1987 and March 1990. A significant difference (Mann-Whitney U Test, p < 0.0358) in median adoption time was observed between the six teaching and 25 non-teaching study hospitals, with the former adopting a new drug in 7.5 months versus the latter adopting a new drug in 12.1 months.

  14. Cast Metals Coalition Technology Transfer and Program Management Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Gwyn, Mike

    2009-03-31

    The Cast Metals Coalition (CMC) partnership program was funded to ensure that the results of the Department of Energy's (DOE) metalcasting research and development (R&D) projects are successfully deployed into industry. Specifically, the CMC program coordinated the transfer and deployment of energy saving technologies and process improvements developed under separately funded DOE programs and projects into industry. The transition of these technologies and process improvements is a critical step in the path to realizing actual energy savings. At full deployment, DOE funded metalcasting R&D results are projected to save 55% of the energy used by the industry in 1998. This closely aligns with DOE's current goal of driving a 25% reduction in industrial energy intensity by 2017. In addition to benefiting DOE, these energy savings provide metalcasters with a significant economic advantage. Deployment of already completed R&D project results and those still underway is estimated to return over 500% of the original DOE and industry investment. Energy savings estimates through December 2008 from the Energy-Saving Melting and Revert Reduction Technology (E-SMARRT) portfolio of projects alone are 12 x 1012 BTUs, with a projection of over 50 x 1012 BTUs ten years after program completion. These energy savings and process improvements have been made possible through the unique collaborative structure of the CMC partnership. The CMC team consists of DOE's Office of Industrial Technology, the three leading metalcasting technical societies in the U.S: the American Foundry Society; the North American Die Casting Association; and the Steel Founders Society of America; and the Advanced Technology Institute (ATI), a recognized leader in distributed technology management. CMC provides collaborative leadership to a complex industry composed of approximately 2,100 companies, 80% of which employ less than 100 people, and only 4% of which employ more than 250 people

  15. [Outpatient management program of patients with chronic heart failure].

    Science.gov (United States)

    Cacciatore, G; Menichelli, M; Albi, F; De Lio, L; Boccanelli, A

    1998-10-01

    Hospitalization of patients with heart failure is often caused by poor adherence to drug therapy, by suboptimal utilization of ACE inhibitors and beta-blockers, and by the lack of systematic monitoring of patients after discharge. The aim of the study is to verify the impact of an outpatient management program on the hospitalization rate and functional status of patients with chronic heart failure. Over a five-year period, 435 patients entered our outpatient management program, which includes adjustment in medical therapy, patient education and visits timed according to the patient's status. Fifty-six percent of the patients were in New York Heart functional class I-II; 74% were male; mean age was 62 +/- 11 years. Heart failure was due to coronary heart disease in 42%, dilated cardiomyopathy in 35%, hypertensive heart disease in 13%, other etiologies in 10%. The following changes in medical therapy were made compared to the period before referral: ACE inhibitors in 88% of the patients vs 70% (p < 0.05), mean dose of enalapril and captopril respectively 18 +/- 6 mg vs 11 +/- 4 mg (p < 0.05) and 89 +/- 28 mg vs 61 +/- 34 mg (p < 0.05); digoxin in 71 vs 70% (NS); furosemide in 90 vs 87%; beta-blockers in 16 vs 6% (p < 0.05); amiodarone in 24 vs 16% (p < 0.05); oral anticoagulants in 22 vs 12% (p < 0.05); calcium channel blockers in 10 vs 16% (p < 0.05). During the follow-up period (35 +/- 11 months), there were 111 hospital admissions compared to 518 during the year before recruitment (p < 0.05). Seventy-two patients died (65 for cardiac causes) and four patients underwent cardiac transplantation. Functional status improved (301 patients in I-II functional class and 56 in III-IV after referral compared to 225 and 132 before referral, respectively). Our results were obtained through adjustment in pharmacological therapy, intensive patient education and therapeutic continuity made possible by our outpatient heart-failure clinic organization. It is likely that the

  16. United States-Japan Industry and Technology Management Training Program

    National Research Council Canada - National Science Library

    Cole, Robert

    2000-01-01

    .... The report presents accomplishments relative to stated program goals, results of cooperative efforts with the other grantees, and the Program's activities in research, the Business Technical Japanese...

  17. Evaluating management regimes for European beech forests using dynamic programming

    Directory of Open Access Journals (Sweden)

    Juan Torres Rojo

    2014-12-01

    Full Text Available Aim of study: This contribution describes a systematic search method for identifying optimum thinning regimes for beech forests (Fagus sylvatica L. by using a combination of optimization heuristics and a simple whole stand growth prediction model. Area of study: Data to build the model come from standard and management forest inventories as well as yield tables from the Northern and Western part of Germany and from southern and central Denmark.Material and Methods: Growth projections are made from equations to project basal area and top height.  The remaining stand variables are recovered from additional equations fitted from forest inventory data or acquired from other authors.  Mortality is estimated through an algorithm based on the maximum density line. The optimization routine uses a two-state dynamic programming model. Thinning type is defined by the NG index, which describes the ratio of the proportion of removed trees and basal area with respect to the same proportion  before thinning. Main results: Growth equations fitted from inventory data show high goodness of fit with R2 values larger than 0.85 and high significance levels for the parameter estimates. The mortality algorithm converges quickly providing mortality estimates within the expected range.Research Highlights: The combination of a simple growth and yield model within a Dynamic Programming framework in conjunction with NG values as indicators of thinning type yield good estimates of practical thinning schedules compared to thinning recommendations provided by diverse authors.Keywords: beech (Fagus sylvatica L.; NG ratio; thinning optimization; growth and yield simulation; mortality.

  18. Analysis of the effect of risk management practices on the performance of new product development programs

    DEFF Research Database (Denmark)

    Oehmen, Josef; Olechowski, Alison; Kenley, C. Robert

    2014-01-01

    performance: (A) Quality Decision Making; (B) High Program Stability; (C) Open, problem solving organization; (D) Overall new product development project success; and (E) overall product success. The results show that six categories of risk management practices are most effective: (1) Develop risk management...... that the risk management practices indirectly associate with the remaining two categories of outcome measures (project and product success). Additional research is needed to describe the exact mechanisms through which risk management practices influence NPD program success. © 2014 Elsevier Ltd. All rights...... by various standards with new product development programs and their association with various dimensions of risk management success. Based on a survey of 291 product development programs, this paper investigates the association of risk management practices with five categories of product development program...

  19. Why Army Program Managers Struggle As Life Cycle Managers: A Study of the PM’s Roles, Responsibilities, and Barriers In the Execution of Operations and Support

    Science.gov (United States)

    2016-09-01

    SUBTITLE WHY ARMY PROGRAM MANAGERS STRUGGLE AS LIFE CYCLE MANAGERS : A STUDY OF THE PM’S ROLES , RESPONSIBILITIES, AND BARRIERS IN THE EXECUTION OF...unlimited. WHY ARMY PROGRAM MANAGERS STRUGGLE AS LIFE CYCLE MANAGERS : A STUDY OF THE PM’S ROLES , RESPONSIBILITIES, AND BARRIERS IN THE EXECUTION OF...PAGE INTENTIONALLY LEFT BLANK v WHY ARMY PROGRAM MANAGERS STRUGGLE AS LIFE CYCLE MANAGERS : A STUDY OF THE PM’S ROLES , RESPONSIBILITIES, AND

  20. Managing NASA's International Space Station Logistics and Maintenance Program

    Science.gov (United States)

    Butina, Anthony

    2001-01-01

    The International Space Station's Logistics and Maintenance program has had to develop new technologies and a management approach for both space and ground operations. The ISS will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines - it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally completed in 2006. It has over 6,000 orbital replaceable units (ORU), and spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors. From conception to operation, the ISS requires a unique approach in all aspects of development and operations. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station for both space and ground operations. It started with the basic support concept developed for Department of Defense systems, and then it was tailored for the unique requirements of a manned space vehicle. Space logistics is a new concept that has wide reaching consequences for both space travel and life on Earth. This paper discusses what type of organization has been put into place to support both space and ground operations and discusses each element of that organization. In addition, some of the unique operations approaches this organization has had to develop is discussed.

  1. Oak Ridge Y-12 Plant groundwater protection program management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Oak Ridge Y- 1 2 Plant (Y-12 Plant) is owned by the United States Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. (Energy Systems) under contract No. DE-AC05-84OR21400. The Y-12 Plant Groundwater Protection Program (GWPP), which was initiated in 1975, provides for the protection of groundwater resources consistent with Federal, State, and local regulations, and in accordance with DOE orders and Energy Systems policies and procedures. The Y-12 Plant is located in Anderson County, Tennessee, and is within the corporate limits of the City of Oak Ridge. The Y-12 Plant is one of three major DOE complexes that comprise the 37,000-acre Oak Ridge Reservation (ORR) located in Anderson and Roane counties. The Y-12 Plant is located in Bear Creek Valley at an elevation of about 950 feet (ft) above sea level. Bear Creek Valley is bounded on the northwest and southeast, and is isolated from populated areas of Oak Ridge, by parallel ridges that rise about 300 ft above the valley floor. The Y-12 Plant and its fenced buffer area are about 0.6 mile wide by 3.2 miles long and cover approximately 4,900 acres. The main industrialized section encompasses approximately 800 acres.

  2. Student Peer Mentoring in a Hospitality Management Program

    Science.gov (United States)

    Lynn, Christine

    2010-01-01

    Mentoring programs are a well recognized means to quicken students' assimilation and increase retention, but not all mentoring programs are successful. It seems that for a peer student mentoring program to be effective, the program would need mandatory participation on both ends. Perhaps both mentors and mentees could voluntarily enroll in…

  3. Effectiveness of an organized bowel management program in the management of severe chronic constipation in children.

    Science.gov (United States)

    Russell, Katie W; Barnhart, Douglas C; Zobell, Sarah; Scaife, Eric R; Rollins, Michael D

    2015-03-01

    Chronic constipation is a common problem in children. The cause of constipation is often idiopathic, when no anatomic or physiologic etiology can be identified. In severe cases, low dose laxatives, stool softeners and small volume enemas are ineffective. The purpose of this study was to assess the effectiveness of a structured bowel management program in these children. We retrospectively reviewed children with chronic constipation without a history of anorectal malformation, Hirschsprung's disease or other anatomical lesions seen in our pediatric colorectal center. Our bowel management program consists of an intensive week where treatment is assessed and tailored based on clinical response and daily radiographs. Once a successful treatment plan is established, children are followed longitudinally. The number of patients requiring hospital admission during the year prior to and year after initiation of bowel management was compared using Fisher's exact test. Forty-four children with refractory constipation have been followed in our colorectal center for greater than a year. Fifty percent had at least one hospitalization the year prior to treatment for obstructive symptoms. Children were treated with either high-dose laxatives starting at 2mg/kg of senna or enemas starting at 20ml/kg of normal saline. Treatment regimens were adjusted based on response to therapy. The admission rate one-year after enrollment was 9% including both adherent and nonadherent patients. This represents an 82% reduction in hospital admissions (pchildren with anorectal malformations, is effective and reduces hospital admissions in children with severe chronic constipation. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. Factors contributing to intervention fidelity in a multi-site chronic disease self-management program

    Directory of Open Access Journals (Sweden)

    Pitt Seraphine

    2006-10-01

    Full Text Available Abstract Background and objectives Disease self-management programs have been a popular approach to reducing morbidity and mortality from chronic disease. Replicating an evidence-based disease management program successfully requires practitioners to ensure fidelity to the original program design. Methods The Florida Health Literacy Study (FHLS was conducted to investigate the implementation impact of the Pfizer, Inc. Diabetes Mellitus and Hypertension Disease Self-Management Program based on health literacy principles in 14 community health centers in Florida. The intervention components discussed include health educator recruitment and training, patient recruitment, class sessions, utilization of program materials, translation of program manuals, patient retention and follow-up, and technical assistance. Results This report describes challenges associated with achieving a balance between adaptation for cultural relevance and fidelity when implementing the health education program across clinic sites. This balance was necessary to achieve effectiveness of the disease self-management program. The FHLS program was implemented with a high degree of fidelity to the original design and used original program materials. Adaptations identified as advantageous to program participation are discussed, such as implementing alternate methods for recruiting patients and developing staff incentives for participation. Conclusion Effective program implementation depends on the talent, skill and willing participation of clinic staff. Program adaptations that conserve staff time and resources and recognize their contribution can increase program effectiveness without jeopardizing its fidelity.

  5. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    Science.gov (United States)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  6. 78 FR 9037 - Meeting of the Uniform Formulary Beneficiary Advisory Panel

    Science.gov (United States)

    2013-02-07

    ... Panel will review and comment on recommendations made to the Director of TRICARE Management Activity, by.... Welcome and Opening Remarks 3. Public Citizen Comments 4. Scheduled Therapeutic Class Reviews (Comments will follow each agenda item) a. Topical Pain Agents b. Pulmonary--2 Agents: COPD c. Anticoagulants d...

  7. Urban Tree Risk Management:A Community Guide to Program Design and Implementation

    Science.gov (United States)

    Jill Pokorny; Joseph O' Brien; Richard Hauer; Gary Johnson; Jana Albers; Peter Bedker; Manfred Mielke

    2003-01-01

    Urban Tree Risk Management: A Community Guide to Program Design and Implementation is a fully illustrated, easy to read training manual written for community leaders, administrators, city foresters, parks and public works staff, and private tree care practitioners. The manual is designed to assist communities design, adopt and implement tree risk management programs,...

  8. 10 CFR 600.120 - Purpose of financial and program management.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose of financial and program management. 600.120 Section 600.120 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES... financial and program management. Sections 600.121 through 600.128 prescribe standards for financial...

  9. 43 CFR 12.920 - Purpose of financial and program management.

    Science.gov (United States)

    2010-10-01

    ... Organizations Post-Award Requirements § 12.920 Purpose of financial and program management. Sections 12.921 through 12.928 prescribe standards for financial management systems, methods for making payments and rules... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Purpose of financial and program...

  10. A Guide for Planning Occupational Programs in Farm Production and Management.

    Science.gov (United States)

    New York State Education Dept., Albany. Bureau of Secondary Curriculum Development.

    Intended for personnel in charge of establishing and conducting programs in farm production and management, the guide reflects the changes in farming by emphasizing farm business management and farm mechanization. The introductory chapter suggests criteria for selecting students and lists some of the occupations for which the program will provide…

  11. Applying EXCEL Solver to a watershed management goal-programming problem

    Science.gov (United States)

    J. E. de Steiguer

    2000-01-01

    This article demonstrates the application of EXCEL® spreadsheet linear programming (LP) solver to a watershed management multiple use goal programming (GP) problem. The data used to demonstrate the application are from a published study for a watershed in northern Colorado. GP has been used by natural resource managers for many years. However, the GP solution by means...

  12. 76 FR 26681 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... AGENCY 40 CFR Part 272 Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management... codify in the regulations entitled ``Approved State Hazardous Waste Management Programs,'' Wisconsin's authorized hazardous waste program. EPA will incorporate by reference into the Code of Federal Regulations...

  13. 78 FR 15299 - New York: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2013-03-11

    ... AGENCY 40 CFR Part 271 New York: Final Authorization of State Hazardous Waste Management Program Revision... Codes, Rules and Regulations (6 NYCRR), Volume A-2A, Hazardous Waste Management System, amended... applied to EPA for final authorization of changes to its hazardous waste program under the Solid Waste...

  14. 77 FR 77005 - Subsistence Management Program for Public Lands in Alaska; Rural Determination Process

    Science.gov (United States)

    2012-12-31

    ... Forest Service DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Subsistence Management Program for Public Lands in Alaska; Rural Determination Process AGENCIES: Forest Service, Agriculture; Fish and... Secretary of the Interior initiated a review of the Federal Subsistence Management Program. An ensuing...

  15. NASA Lewis Research Center low-gravity fluid management technology program

    Science.gov (United States)

    Aydelott, J. C.; Carney, M. J.; Hochstein, J. I.

    1985-01-01

    A history of the Lewis Research Center in space fluid management technology program is presented. Current programs which include numerical modeling of fluid systems, heat exchanger/radiator concept studies, and the design of the Cryogenic Fluid Management Facility are discussed. Recent analytical and experimental activities performed to support the Shuttle/Centaur development activity are highlighted.

  16. MANAGEMENT AIDE IN LOW-RENT PUBLIC HOUSING PROJECTS, A SUGGESTED TRAINING PROGRAM.

    Science.gov (United States)

    Office of Education (DHEW), Washington, DC.

    RESOURCE MATERIAL IS PROVIDED FOR USE IN DEVELOPING A TRAINING PROGRAM FOR MANAGEMENT AIDES, PERSONS WHO ASSIST HOUSING MANAGERS OF LOCAL HOUSING AUTHORITIES IN ORIENTING RESIDENTS TO LIVING IN A NEW ENVIRONMENT. THE PROGRAM OBJECTIVE IS TO PREPARE TRAINEES TO ESTABLISH WORKING RELATIONSHIPS WITH PEOPLE OF VARYING BACKGROUNDS, INTERPRET…

  17. Quality Management of Body Donation Program at the University of Padova

    Science.gov (United States)

    Porzionato, Andrea; Macchi, Veronica; Stecco, Carla; Mazzi, Anna; Rambaldo, Anna; Sarasin, Gloria; Parenti, Anna; Scipioni, Antonio; De Caro, Raffaele

    2012-01-01

    Quality management improvement has become a recent focus of attention in medical education. The program for the donation of bodies and body parts (Body Donation Program) at the University of Padova has recently been subjected to a global quality management standard, the ISO 9001:2008 certification. The aim of the present work is to show how the…

  18. 48 CFR 301.607 - Certification of Program and Project Managers.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Certification of Program and Project Managers. 301.607 Section 301.607 Federal Acquisition Regulations System HEALTH AND HUMAN... Responsibilities 301.607 Certification of Program and Project Managers. ...

  19. 78 FR 79310 - Partial Section Eight Management Assessment Program (SEMAP) Indicator Waiver; Family Self...

    Science.gov (United States)

    2013-12-30

    ... URBAN DEVELOPMENT 24 CFR Part 985 Partial Section Eight Management Assessment Program (SEMAP) Indicator... decreased rating on the Section 8 Management Assessment Program (SEMAP) performance indicator that... questionnaire, provides one way for PHAs to certify their performance to HUD on fourteen indicators. Under...

  20. Empowering primary care workers to improve health services: results from Mozambique's leadership and management development program.

    Science.gov (United States)

    Perry, Cary

    2008-07-23

    This article is the third article in the Human Resources for Health journal's feature on the theme of leadership and management in public health. The series of six articles has been contributed by Management Sciences for Health (MSH) and will be published article-by-article over the next few weeks. The third article presents a successful application in Mozambique of a leadership development program created by Management Sciences for Health (MSH). Through this program, managers from 40 countries have learned to work in teams to identify their priority challenges and act to implement effective responses. From 2003 to 2004, 11 health units in Nampula Province, participated in a leadership and management development program called the Challenges Program. This was following an assessment which found that the quality of health services was poor, and senior officials determined that the underlying cause was the lack of human resource capacity in leadership and management in a rapidly decentralizing health care system. The program was funded by the US Agency for International Development (USAID) and implemented in partnership between the Mozambican Ministry of Health (MOH) Provincial Directorate in Nampula and Management Sciences for Health (MSH). The Challenges Program used simple management and leadership tools to assist the health units and their communities to address health service challenges. An evaluation of the program in 2005 showed that 10 of 11 health centers improved health services over the year of the program. The Challenges Program used several strategies that contributed to successful outcomes. It integrated leadership strengthening into the day-to-day challenges that staff were facing in the health units. The second success factor in the Challenges Program was the creation of participatory teams. After the program, people no longer waited passively to be trained but instead proactively requested training in needed areas. MOH workers in Nampula reported

  1. Development of a standardized job description for healthcare managers of metabolic syndrome management programs in Korean community health centers.

    Science.gov (United States)

    Lee, Youngjin; Choo, Jina; Cho, Jeonghyun; Kim, So-Nam; Lee, Hye-Eun; Yoon, Seok-Jun; Seomun, GyeongAe

    2014-03-01

    This study aimed to develop a job description for healthcare managers of metabolic syndrome management programs using task analysis. Exploratory research was performed by using the Developing a Curriculum method, the Intervention Wheel model, and focus group discussions. Subsequently, we conducted a survey of 215 healthcare workers from 25 community health centers to verify that the job description we created was accurate. We defined the role of healthcare managers. Next, we elucidated the tasks of healthcare managers and performed needs analysis to examine the frequency, importance, and difficulty of each of their duties. Finally, we verified that our job description was accurate. Based on the 8 duties, 30 tasks, and 44 task elements assigned to healthcare managers, we found that the healthcare managers functioned both as team coordinators responsible for providing multidisciplinary health services and nurse specialists providing health promotion services. In terms of importance and difficulty of tasks performed by the healthcare managers, which were measured using a determinant coefficient, the highest-ranked task was planning social marketing (15.4), while the lowest-ranked task was managing human resources (9.9). A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs. Copyright © 2014. Published by Elsevier B.V.

  2. Cost-effective management of the hospital-based hospice program.

    Science.gov (United States)

    Baker, M

    1992-01-01

    As hospital-based hospice programs proliferate across the country, most are under the leadership of a nurse administrator. Nurse administrators must be prepared to manage the many components that constitute the broad scope of this role. Cost-effective management is the greatest challenge. The author explores this management role, including a discussion of hospice-program reimbursement, hospital-based program advantages, options to increase staff productivity, management of drugs and durable medical equipment, inpatient admissions, volunteer services, and fund-raising. Cost-effective measures are explored throughout the discussion, along with a history and explanation of the hospice concept of care.

  3. Springfield/L-COG Energy Plan Implementation Program, Internal Energy Management Project: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lane Council of Governments (Or.); Tumidaj, Les

    1985-09-01

    The Internal Energy Management Project was developed as a component of the Springfield/L-COG Energy Plan Implementation Program. The project also took advantage of the ground work laid by the Lane Council of Governments through the Lane County Electric Energy Planning Program. This program, conducted in 1982 and 1983, developed detailed recommendations for Lane County cities concerning energy management and planning. Based on these recommendations, many jurisdictions committed themselves to implement energy management programs. Initially, the participating cities included Springfield, Veneta, Oakridge, Creswell, and Lowell. Two other local governments - Florence and Lane County - requested assistance once the project commenced.

  4. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  5. 41 CFR 102-192.150 - What are your general responsibilities as a program level mail manager?

    Science.gov (United States)

    2010-07-01

    ... responsibilities as a program level mail manager? 102-192.150 Section 102-192.150 Public Contracts and Property... general responsibilities as a program level mail manager? Your responsibilities at the program level include— (a) Working closely with the agency mail manager and mail center managers who handle significant...

  6. Program Office Support Change Management System (POS CMS)

    Data.gov (United States)

    Office of Personnel Management — This application is used by the U.S. Office of Personnel Management (OPM)'s Office of the Chief Information Officer (CIO) for tracking software change requests for...

  7. Increasing compliance with mass drug administration programs for lymphatic filariasis in India through education and lymphedema management programs.

    Science.gov (United States)

    Cantey, Paul T; Rout, Jonathan; Rao, Grace; Williamson, John; Fox, LeAnne M

    2010-06-29

    Nearly 45% of people living at risk for lymphatic filariasis (LF) worldwide live in India. India has faced challenges obtaining the needed levels of compliance with its mass drug administration (MDA) program to interrupt LF transmission, which utilizes diethylcarbamazine (DEC) or DEC plus albendazole. Previously identified predictors of and barriers to compliance with the MDA program were used to refine a pre-MDA educational campaign. The objectives of this study were to assess the impact of these refinements and of a lymphedema morbidity management program on MDA compliance. A randomized, 30-cluster survey was performed in each of 3 areas: the community-based pre-MDA education plus community-based lymphedema management education (Com-MDA+LM) area, the community-based pre-MDA education (Com-MDA) area, and the Indian standard pre-MDA education (MDA-only) area. Compliance with the MDA program was 90.2% in Com-MDA+LM, 75.0% in Com-MDA, and 52.9% in the MDA-only areas (peducational intervention were: 1) knowing about the MDA in advance of its occurrence, 2) knowing everyone is at risk for LF, 3) knowing that the MDA was for LF, and 4) knowing at least one component of the lymphedema management techniques taught in the lymphedema management program. This study confirmed previously identified predictors of and barriers to compliance with India's MDA program for LF. More importantly, it showed that targeting these predictors and barriers in a timely and clear pre-MDA educational campaign can increase compliance with MDA programs, and it demonstrated, for the first time, that lymphedema management programs may also increase compliance with MDA programs.

  8. Increasing compliance with mass drug administration programs for lymphatic filariasis in India through education and lymphedema management programs.

    Directory of Open Access Journals (Sweden)

    Paul T Cantey

    2010-06-01

    Full Text Available Nearly 45% of people living at risk for lymphatic filariasis (LF worldwide live in India. India has faced challenges obtaining the needed levels of compliance with its mass drug administration (MDA program to interrupt LF transmission, which utilizes diethylcarbamazine (DEC or DEC plus albendazole. Previously identified predictors of and barriers to compliance with the MDA program were used to refine a pre-MDA educational campaign. The objectives of this study were to assess the impact of these refinements and of a lymphedema morbidity management program on MDA compliance.A randomized, 30-cluster survey was performed in each of 3 areas: the community-based pre-MDA education plus community-based lymphedema management education (Com-MDA+LM area, the community-based pre-MDA education (Com-MDA area, and the Indian standard pre-MDA education (MDA-only area. Compliance with the MDA program was 90.2% in Com-MDA+LM, 75.0% in Com-MDA, and 52.9% in the MDA-only areas (p<0.0001. Identified barriers to adherence included: 1 fear of side effects and 2 lack of recognition of one's personal benefit from adherence. Multivariable predictors of adherence amenable to educational intervention were: 1 knowing about the MDA in advance of its occurrence, 2 knowing everyone is at risk for LF, 3 knowing that the MDA was for LF, and 4 knowing at least one component of the lymphedema management techniques taught in the lymphedema management program.This study confirmed previously identified predictors of and barriers to compliance with India's MDA program for LF. More importantly, it showed that targeting these predictors and barriers in a timely and clear pre-MDA educational campaign can increase compliance with MDA programs, and it demonstrated, for the first time, that lymphedema management programs may also increase compliance with MDA programs.

  9. MANAGEMENT PROGRAMS ROAD REPAIR WORKS OF THE ROADS NETWORK

    Directory of Open Access Journals (Sweden)

    Вікторія Василівна ІГНАТЮК

    2015-05-01

    Full Text Available The paper discusses the model and algorithm optimization program of road repair works, with limited funds. Features introduction program for calculating rational level detection repair costs for the period of the program, which allows dos evolve a desired operating condition of the pavement.

  10. Clothing behavior, body cathexis, and appearance management of women enrolled in a commercial weight loss program

    OpenAIRE

    Robinson, Tammy Renee'

    2003-01-01

    The purpose of this study was to determine the relationship between appearance management, created appearance, body cathexis, and clothing behavior for a group of women enrolled in a commercial weight loss program. Subjects were 171 females enrolled in Weight Watchers® programs in Christiansburg, Virginia. No previous research had investigated clothing behavior, appearance management, created appearance, and body cathexis of women in a weight loss program. Because clothing is such an integra...

  11. Availability and Perceived Value of Masters of Business Administration Degree Programs in Pharmaceutical Marketing and Management

    Science.gov (United States)

    Clauson, Kevin A.; Latif, David A.

    2012-01-01

    Objectives. To examine pharmacist-targeted master of business administration (MBA) degree programs and investigate pharmacists’ perceptions regarding them. Methods. Specialized MBA programs in pharmaceutical marketing and management offered at US colleges and schools of pharmacy were identified in the literature and compared. Pharmacists’ perceptions of MBA programs were evaluated through a survey of clinical preceptors affiliated with a school of pharmacy. Results. Seven US universities that offer an MBA program in pharmaceutical marketing and management were identified. Thirty-three percent of the 57 pharmacist preceptors who responded to the survey reported plans to pursue an MBA degree program. Respondents preferred MBA programs related to healthcare or pharmacy (66%) over general MBA programs (33%). Conclusion. An MBA in pharmaceutical marketing and management could provide pharmacists with advanced knowledge of the operational and strategic business aspects of pharmacy practice and give pharmacy graduates an advantage in an increasingly competitive job market. PMID:22611273

  12. Availability and perceived value of masters of business administration degree programs in pharmaceutical marketing and management.

    Science.gov (United States)

    Alkhateeb, Fadi M; Clauson, Kevin A; Latif, David A

    2012-05-10

    To examine pharmacist-targeted master of business administration (MBA) degree programs and investigate pharmacists' perceptions regarding them. Specialized MBA programs in pharmaceutical marketing and management offered at US colleges and schools of pharmacy were identified in the literature and compared. Pharmacists' perceptions of MBA programs were evaluated through a survey of clinical preceptors affiliated with a school of pharmacy. Seven US universities that offer an MBA program in pharmaceutical marketing and management were identified. Thirty-three percent of the 57 pharmacist preceptors who responded to the survey reported plans to pursue an MBA degree program. Respondents preferred MBA programs related to healthcare or pharmacy (66%) over general MBA programs (33%). An MBA in pharmaceutical marketing and management could provide pharmacists with advanced knowledge of the operational and strategic business aspects of pharmacy practice and give pharmacy graduates an advantage in an increasingly competitive job market.

  13. 10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.

    Science.gov (United States)

    2010-01-01

    ... Environmental Management Programs. (a) The Office of Federal and State Materials and Environmental Management...) The Office of Federal and State Materials and Environmental Management Programs— (1) Plans and directs... 10 Energy 1 2010-01-01 2010-01-01 false Office of Federal and State Materials and Environmental...

  14. 49 CFR 192.909 - How can an operator change its integrity management program?

    Science.gov (United States)

    2010-10-01

    ... Transmission Pipeline Integrity Management § 192.909 How can an operator change its integrity management... 49 Transportation 3 2010-10-01 2010-10-01 false How can an operator change its integrity management program? 192.909 Section 192.909 Transportation Other Regulations Relating to Transportation...

  15. 76 FR 67370 - Federal Property Management Regulation (FPMR); Procurement Sources and Programs

    Science.gov (United States)

    2011-11-01

    ... 1] RIN 3090-AJ19 Federal Property Management Regulation (FPMR); Procurement Sources and Programs.... SUMMARY: The General Services Administration (GSA) is revising the Federal Property Management Regulation... Chapter 101 as follows: CHAPTER 101--FEDERAL PROPERTY MANAGEMENT REGULATIONS PART 101-26--PROCUREMENT...

  16. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  17. Testing an online self-management program for patients with CVR: an explorative RCT.

    NARCIS (Netherlands)

    Puijk-Hekman, S.; Gaal, B.G.I. van; Bredie, S.J.; Nijhuis-van der Sanden M.W.G.; Dulmen, S. van

    2016-01-01

    Background: Because of the large impact of cardiovascular risk (CVR), there is a growing interest in self-management for patients with CVR. To support self-management behavior for patients with CVR, an e-health self-management program has been developed. In this study, we will evaluate the

  18. 76 FR 584 - Glen Canyon Dam Adaptive Management Program Work Group (AMWG)

    Science.gov (United States)

    2011-01-05

    ... Bureau of Reclamation Glen Canyon Dam Adaptive Management Program Work Group (AMWG) AGENCY: Bureau of... Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon Monitoring and Research Center.... Glen Knowles, Chief, Adaptive Management Work Group, Environmental Resources Division, Upper Colorado...

  19. The evolution of project management approach to innovation: the initiative, project, program, portfolio

    Directory of Open Access Journals (Sweden)

    Baklanova Julia

    2012-03-01

    Full Text Available The author shows the close relationship between the innovative development of the economic entity, projects, programs, portfolios, strategic management. Stresses that the innovative development of the most effective it is at the expense of project management that the maximum positive effect generated by the implementation of innovation with methods, techniques, tools of project management.

  20. A Descriptive Study of Wisconsin PK-12 Virtual Public School Program Operations and Management

    Science.gov (United States)

    Banker, Margaret M.

    2012-01-01

    E-Learning as it pertains to public education is in its infancy in America. There is limited research on what operational design, development, and management attributes of virtual school programs foster student achievement. The Wisconsin Department of Instruction has not developed or adopted program standards for E-Learning programs. The purpose…

  1. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Science.gov (United States)

    2011-12-01

    ... COMMISSION Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory... Program for Steam Generators.'' This LR-ISG provides the NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI) document, NEI 97-06, ``Steam Generator Program...

  2. Evaluation of a Self-Instructional Program in Stress Management for College Students.

    Science.gov (United States)

    Ramsey, Sheila A.; And Others

    1989-01-01

    Results of an investigation to evaluate the effectiveness of a portable self-instructional stress management program for college students are reported. Program components (five self-contained learning stations) are described. Program effectiveness was measured, using several instruments, by changes in subjects'(n=150) knowledge, attitudes, and…

  3. Key Features of Management of Technology (MoT) Undergraduate Program in Malaysia

    Science.gov (United States)

    Shamsuddin, Alina; Abdullah, Nor Hazana; Wahab, Eta

    2011-01-01

    Management of Technology (MoT) Education is growing both in numbers and importance. There are more than 200 universities in the world that are offering MoT programs. However, these universities have taken different approaches with respect to the names and designs of the programs. In Malaysia, some of the programs are known as Technology…

  4. Tribal CCDF Guide to "Financial Management, Grants Administration, and Program Accountability"

    Science.gov (United States)

    Child Care Bureau, 2009

    2009-01-01

    Tribal managers and staff working with Federal grants must be fully knowledgeable of all applicable Federal requirements and skilled in applying these requirements to the daily operation of their programs, whether starting a new program or striving to maintain a quality program which meets the intent of the enacting legislation. It is the…

  5. Attrition in Chronic Disease Self-Management Programs and Self-Efficacy at Enrollment

    Science.gov (United States)

    Verevkina, Nina; Shi, Yunfeng; Fuentes-Caceres, Veronica Alejandra; Scanlon, Dennis Patrick

    2014-01-01

    Among other goals, the Chronic Disease Self-Management Program (CDSMP) is designed to improve self-efficacy of the chronically ill. However, a substantial proportion of the enrollees often leave CDSMPs before completing the program curriculum. This study examines factors associated with program attrition in a CDSMP implemented in a community…

  6. Anger & Aggression Management in Young Adolescents: An Experimental Validation of the SCARE Program.

    Science.gov (United States)

    Herrmann, D. Scott; McWhirter, J. Jeffries

    2003-01-01

    A study examined the validity of the SCARE program; an anger management program developed with high school students. Adolescents (n=207) exposed to the SCARE program had significantly lower levels of anger and aggression, slightly higher anger control, and lower scores on aggressive and violent attitudes a year after exposure. (Contains…

  7. An Assessment of the Effectiveness of Air Force Risk Management Practices in Program Acquisition Using Survey Instrument Analysis

    Science.gov (United States)

    2015-06-18

    the Defense Acquisition University (DAU) Program Management Tools ( PMT ) courses, PMT 251 and PMT 257. Those courses focus on program 37 management...Management PMI Project Management Institute PMT Program Management Tools RM Risk Management SE Systems Engineering TRL Technology Readiness...Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that

  8. Outcomes of an osteoporosis disease-management program managed by nurse practitioners.

    Science.gov (United States)

    Greene, Denise; Dell, Richard M

    2010-06-01

    To detail the outcomes of an osteoporosis disease-management program where nurse practitioners (NPs) have taken a leadership role in screening, diagnosing, and treating patients at risk for osteoporosis. An electronic medical record (EMR) was used to collect demographic, pharmacy, dual x-ray absorptiometry (DXA) scan, and fracture data from a population of over 625,000 patients with one or more risk factors for osteoporosis. Monthly reports were generated and distributed to the NPs to assist them in identifying patients that required screening or treatment. Over a 6-year period there was a 263% increase in the number of screening DXA scans done each year, a 153% increase in the number of patients on anti-osteoporosis medications each year, and a 38.1% decrease in the expected hip fracture rate. NPs play an important leadership role in managing osteoporosis within a large health maintenance organization. The screening and interventions used can be applied by any NP in any practice setting on an individual basis to reduce hip fracture rates in the United States.

  9. Development of a training program to support health care professionals to deliver the SPACE for COPD self-management program

    Directory of Open Access Journals (Sweden)

    Blackmore C

    2017-06-01

    Full Text Available Claire Blackmore,1 Vicki L Johnson-Warrington,2 Johanna EA Williams,2 Lindsay D Apps,2 Hannah ML Young,2 Claire LA Bourne,2 Sally J Singh2 1Kettering General Hospital National Health Service (NHS Trust, Kettering, Northamptonshire, 2Centre for Exercise and Rehabilitation Science, Leicester Respiratory Biomedical Research Unit, University Hospitals of Leicester NHS Trust, Leicester, UK Background: With the growing burden of COPD and associated morbidity and mortality, a need for self-management has been identified. The Self-management Programme of ­Activity, Coping and Education for Chronic Obstructive Pulmonary Disease (SPACE for COPD manual was developed to support self-management in COPD patients. Currently, there is no literature available regarding health care professionals’ training needs when supporting patients with COPD on self-management.Aim: This study sought to identify these needs to inform, design and develop a training program for health care professionals being trained to deliver a self-management program in COPD.Methods: Fourteen health care professionals from both primary and secondary care COPD services participated in face-to-face semistructured interviews. Thematic analysis was used to produce a framework and identify training needs and views on delivery of the SPACE for COPD self-management program. Components of training were web-based knowledge training, with pre- and posttraining knowledge questionnaires, and a 1-day program to introduce the self-management manual. Feedback was given after training to guide the development of the training program.Results: Health care professionals were able to identify areas where they required increased knowledge to support patients. This was overwhelming in aspects of COPD seen to be outside of their current clinical role. Skills in goal setting and behavioral change were not elicited as a training need, suggesting a lack of understanding of components of supporting self-management

  10. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    Science.gov (United States)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  11. Environmental fellows program - professional development in environmental management for emerging world leaders

    Energy Technology Data Exchange (ETDEWEB)

    Jacquez, R.B.; Bhada, R.K. [New Mexico State Univ., Las Cruces, NM (United States)

    1994-12-31

    A unique program, the Environmental Fellows Program (EFP), has been established by the Waste-management Education & Research Consortium. The mission of the program is to expand the world`s capability to address issues associated with the management of wastes. The mission will be accomplished by establishing a world-wide community of highly qualified administrators, engineers, and scientists in the field of environmental management. The EFP is the only program in the world that provides intensive graduate level training to world leaders emerging from academia, government, and industry. Through this program, future strategies of the international community of leaders will be directed with an understanding of the technology, economics, the risk awareness, and other issues related to environmental management. The program includes five components: Professional Fellows Training Program, Graduate Fellows Program, Colloquium series featuring world-class experts in environmental management, Annual international conference focusing on a timely, relevant, specific issue of environmental management, and Practical internship. The Professional Fellows Training Program and Graduate Program are provided to individuals selected from industry and government on the basis of their technical and administrative abilities. These Fellows receive intensive graduate level training at a New Mexico university in an area relevant to environmental management. This program has been initiated with nine Fellows from Mexico selected jointly by the Mexican authorities and the U.S. The Colloquim Series is designed to bring the Fellows together on a frequent basis to discuss specific environmental issues, thus using their expertise to shed light on a major international environmental issue, the conference on environmental management. The practical internship will be made available to the Fellows who desire practical experience at a government laboratory, university, or industry.

  12. Human Resource Managements as a part of the Human Factors Management Program(HFMP) for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, DaeHo; Lee, YongHee; Lee, JungWoon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Younggab [Korea Hydro and Nuclear Power Co. LTD, Daejeon (Korea, Republic of)

    2007-10-15

    Programs for the effective implementation and management of human factor issues in nuclear power plants (NPPs) should contain technical criteria, an establishment of a job process, and activities for job improvements and be a system through which human factors can be managed in an integrated way. Human factors to be managed should include those related to an operation of plants as well as those related to a plant design as mentioned in NUREG-0800(2004), NUREG- 0711(2004), and NUREG-0700(2002). Human factor items to be managed for an operation of plants are listed in the PSR (Periodic Safety Review) items defined in the Enforcement of Regulation of the Atomic Energy Act. They are procedures, a work management system including a shift work management, a qualification management of plant personnel, training, a work amount assessment, a MMI (Man Machine Interface), and the use of experience. Among these factors, factors related to a human resource management include work management systems and the status of a work management including shift work, a qualification management ensuring qualified workers on duty at all times, and the systems for and the status of training and education. This paper addresses the scope of a human resource management, guidelines and procedures to be developed for a human resource management, and considerations critical in the development of guidelines and procedures.

  13. A portable, self-instructional stress management program for college students.

    Science.gov (United States)

    Greenberg, J S; Ramsey, S A; Hale, J F

    1987-02-01

    This article describes the process used to develop a stress management program for college students and the program that resulted. Based on a needs assessment and piloting of the program, a portable, modular self-instructional program was developed. The program consists of five instructional stations: Assessment; The Nature of Stress and the Skill of Cognitive Restructuring; The Effects and Consequences of Stress and Time Management Skills; Relaxation Skills; and Planning For Stress Control. Feasibility in administering the program was of particular importance, so the program was portable. It can be transported to residence halls, student unions, or other gathering places, and it does not require a trained professional to be present. Included are two videotapes and two slide/audiotapes produced by the program's developers, one relaxation tape (guided imagery), and handout materials.

  14. NASA University Program Management Information System: FY 1995

    Science.gov (United States)

    1995-01-01

    The University Program Report, Fiscal Year 1995, provides current information and related statistics for grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  15. NASA University program management information system, FY 1993

    Science.gov (United States)

    1993-01-01

    The University Program Report, Fiscal Year 1993, provides current information and related statistics for 7682 grants/contracts/cooperative agreements active during the report period. NASA field centers and certain Headquarters program offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  16. NASA university program management information system, FY 1985

    Science.gov (United States)

    1985-01-01

    The University Program Report provides current information and related statistics for approximately 4200 grants/contracts/cooperative agreements active during the reporting period. NASA Field Centers and certain Headquarters Program Offices provide funds for those research and development activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-University relationship, frequently denoted, collectively, as NASA's University Program.

  17. NASA university program management information system, FY 1994

    Science.gov (United States)

    1994-01-01

    The University Program report, Fiscal Year 1994, provides current information and related statistics for 7841 grants/contracts/cooperative agreements active during the reporting period. NASA field centers and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  18. NASA university program management information system, FY 1986

    Science.gov (United States)

    1986-01-01

    The University Program Report provides current information and related statistics for approximately 4300 grants/contracts/cooperative agreements active during the report period. NASA Field centers and certain Headquarters Program Offices provide funds for those R&D activities in universities which contribute to the mission needs of that particular NASA element. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program.

  19. Expansion of the Coordinator Role in Orthopaedic Residency Program Management

    OpenAIRE

    Grant, Richard E.; Murphy, Laurie A.; Murphy, James E.

    2008-01-01

    The Accreditation Council of Graduate Medical Education’s (ACGME) Data Accreditation System indicates 124 of 152 orthopaedic surgery residency program directors have 5 or fewer years of tenure. The qualifications and responsibilities of the position based on the requirements of orthopaedic surgery residency programs, the institutions that support them, and the ACGME Outcome Project have evolved the role of the program coordinator from clerical to managerial. To fill the void of information on...

  20. Test Program of the "Combined Data and Power Management Infrastructure"

    Science.gov (United States)

    Eickhoff, Jens; Fritz, Michael; Witt, Rouven; Bucher, Nico; Roser, Hans-Peter

    2013-08-01

    As already published in previous DASIA papers, the University of Stuttgart, Germany, is developing an advanced 3-axis stabilized small satellite applying industry standards for command/control techniques and Onboard Software design. This satellite furthermore features an innovative hybrid architecture of Onboard Computer and Power Control and Distribution Unit. One of the main challenges was the development of an ultra-compact and performing Onboard Computer (OBC), which was intended to support an RTEMS operating system, a PUS standard based Onboard Software (OBSW) and CCSDS standard based ground/space communication. The developed architecture (see [1, 2, 3]) is called a “Combined Onboard Data and Power Management Infrastructure” - CDPI. It features: The OBC processor boards based on a LEON3FT architecture - from Aeroflex Inc., USA The I/O Boards for all OBC digital interfaces to S/C equipment (digital RIU) - from 4Links Ltd. UK CCSDS TC/TM decoder/encoder boards - with same HW design as I/O boards - just with limited number of interfaces. HW from 4Links Ltd, UK, driver SW and IP-Core from Aeroflex Gaisler, SE Analog RIU functions via enhanced PCDU from Vectronic Aerospace, D OBC reconfiguration unit functions via Common Controller - here in PCDU [4] The CDPI overall assembly is meanwhile complete and a exhaustive description can be found in [5]. The EM test campaign including the HW/SW compatibility testing is finalized. This comprises all OBC EM units, OBC EM assembly and the EM PCDU. The unit test program for the FM Processor-Boards and Power-Boards of the OBC are completed and the unit tests of FM I/O-Boards and CCSDS-Boards have been completed by 4Links at the assembly house. The subsystem tests of the assembled OBC also are completed and the overall System tests of the CDPI with system reconfiguration in diverse possible FDIR cases also reach the last steps. Still ongoing is the subsequent integration of the CDPI with the satellite's avionics components