WorldWideScience

Sample records for preventer system testing

  1. Converting Hangar High Expansion Foam Systems to Prevent Cockpit Damage: Full-Scale Validation Tests

    Science.gov (United States)

    2017-09-01

    AFCEC-CO-TY-TR-2018-0001 CONVERTING HANGAR HIGH EXPANSION FOAM SYSTEMS TO PREVENT COCKPIT DAMAGE: FULL-SCALE VALIDATION TESTS Gerard G...manufacturer, or otherwise does not constitute or imply its endorsement, recommendation , or approval by the United States Air Force. The views and...09-2017 Final Test Report May 2017 Converting Hangar High Expansion Foam Systems to Prevent Cockpit Damage: Full-Scale Validation Tests N00173-15-D

  2. Runway Incursion Prevention System: Demonstration and Testing at the Dallas/Fort Worth International Airport

    Science.gov (United States)

    Jones, Denise R.; Quach, Cuong C.; Young, Steven D.

    2007-01-01

    A Runway Incursion Prevention System (RIPS) was tested at the Dallas-Ft. Worth International Airport (DFW) in October 2000. The system integrated airborne and ground components to provide both pilots and controllers with enhanced situational awareness, supplemental guidance cues, a real-time display of traffic information, and warning of runway incursions in order to prevent runway incidents while also improving operational capability. A series of test runs was conducted using NASA s Boeing 757 research aircraft and a test van equipped to emulate an incurring aircraft. The system was also demonstrated to over 100 visitors from the aviation community. This paper gives an overview of the RIPS, DFW flight test activities, and quantitative and qualitative results of the testing.

  3. [Evaluation on application of China Disease Prevention and Control Information System of Hydatid Disease II System integration and simulation tests].

    Science.gov (United States)

    Qing, Yu; Shuai, Han; Qiang, Wang; Jing-Bo, Xue

    2017-06-08

    To report the integrated progress of the hydatid disease information management system, and to provide the reference for further system improvements by analysis of results on simulation test feedback. The work of institutional code matching by collecting fundamental and integrated information of the system in epidemic areas of hydatid disease was carried out, and professional control agencies were selected to carry out the simulation test. The results of agencies code matching at stage indicated the average completion rate was 94.30% on administrative agencies, 69.94% on registered professional agencies and 56.40% on professional institutions matching related to hydatid disease prevention and control implements in seven provinces (autonomous regions) and Xinjiang Production and Construction Corps. Meanwhile, the response rate of open-ended proposals was 93.33% on fifteen feedbacks, and the statistics showed 21.43% believed the system was low fluency, 64.29% considered the system was inconvenience for data inputs and 42.86% considered it would be improved on system statistics functions, of which 27.78% were provincial users, 22.22% were the city users and 50.00% were the county users. The hydatid disease prevention information management system meets the fundamental needs of the majority agencies in hyperendemic areas of echinococcosis, it needs to develop the further test with more agencies joining after the work of the institutional code matching completion and the system service improvement in the next stage.

  4. Test System Impact on System Availability

    DEFF Research Database (Denmark)

    Pau, L. F.

    1987-01-01

    The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance of the sys......The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance...... of the system subject to monitoring and test. A time-dependent Markov model is presented, and applied in three cases, with examples of numerical results provided for preventive maintenance decisions, design of an automatic test system, buffer testing in computers, and data communications....

  5. [Measures to prevent patient identification errors in blood collection/physiological function testing utilizing a laboratory information system].

    Science.gov (United States)

    Shimazu, Chisato; Hoshino, Satoshi; Furukawa, Taiji

    2013-08-01

    We constructed an integrated personal identification workflow chart using both bar code reading and an all in-one laboratory information system. The information system not only handles test data but also the information needed for patient guidance in the laboratory department. The reception terminals at the entrance, displays for patient guidance and patient identification tools at blood-sampling booths are all controlled by the information system. The number of patient identification errors was greatly reduced by the system. However, identification errors have not been abolished in the ultrasound department. After re-evaluation of the patient identification process in this department, we recognized that the major reason for the errors came from excessive identification workflow. Ordinarily, an ultrasound test requires patient identification 3 times, because 3 different systems are required during the entire test process, i.e. ultrasound modality system, laboratory information system and a system for producing reports. We are trying to connect the 3 different systems to develop a one-time identification workflow, but it is not a simple task and has not been completed yet. Utilization of the laboratory information system is effective, but is not yet perfect for patient identification. The most fundamental procedure for patient identification is to ask a person's name even today. Everyday checks in the ordinary workflow and everyone's participation in safety-management activity are important for the prevention of patient identification errors.

  6. Disaster prevention surveillance system

    International Nuclear Information System (INIS)

    Nara, Satoru; Kamiya, Eisei

    2001-01-01

    Fuji Electric Co., Ltd. has supplied many management systems to nuclear reactor institution. 'The nuclear countermeasures-against-calamities special-measures' was enforced. A nuclear entrepreneur has devised the measure about expansion prevention and restoration of a calamity while it endeavors after prevention of generating of a nuclear calamity. Our company have supplied the 'disaster prevention surveillance system' to the Japan Atomic Energy Research Institute Tokai Research Establishment aiming at strengthening of the monitoring function at the time (after the accident) of the accident used as one of the above-mentioned measures. A 'disaster prevention surveillance system' can share the information on the accident spot in an on-site command place, an activity headquarters, and support organizations, when the serious accident happens. This system is composed of various sensors (temperature, pressure and radiation), cameras, computers and network. (author)

  7. Digital System Reliability Test for the Evaluation of safety Critical Software of Digital Reactor Protection System

    Directory of Open Access Journals (Sweden)

    Hyun-Kook Shin

    2006-08-01

    Full Text Available A new Digital Reactor Protection System (DRPS based on VME bus Single Board Computer has been developed by KOPEC to prevent software Common Mode Failure(CMF inside digital system. The new DRPS has been proved to be an effective digital safety system to prevent CMF by Defense-in-Depth and Diversity (DID&D analysis. However, for practical use in Nuclear Power Plants, the performance test and the reliability test are essential for the digital system qualification. In this study, a single channel of DRPS prototype has been manufactured for the evaluation of DRPS capabilities. The integrated functional tests are performed and the system reliability is analyzed and tested. The results of reliability test show that the application software of DRPS has a very high reliability compared with the analog reactor protection systems.

  8. Debris prevention system, radiation system, and lithograpic apparatus

    NARCIS (Netherlands)

    2009-01-01

    A debris prevention system is constructed and arranged to prevent debris that emanates from a radiation source from propagating with radiation from the radiation source into or within a lithographic apparatus. The debris prevention system includes an aperture that defines a maximum emission angle of

  9. Safety testing for LHC access system

    CERN Document Server

    Valentini, F; Ninin, P; Scibile, S

    2008-01-01

    In the domain of Safety Real-Time Systems the problem of testing represents always a big effort in terms of time, costs and efficiency to guarantee an adequate coverage degree. Exhaustive tests may, in fact, not be practicable for large and distributed systems. This paper describes the testing process followed during the validation of the CERN's LHC Access System [1], responsible for monitoring and preventing physical risks for the personnel accessing the underground areas. In the paper we also present a novel strategy for the testing problem, intended to drastically reduce the time for the test patterns generation and execution. In particular, we propose a methodology for blackbox testing that relies on the application of Model Checking techniques. Model Checking is a formal method from computer science, commonly adopted to prove correctness of system’s models through an automatic system’s state space exploration against some property formulas.

  10. Development of an automatic subsea blowout preventer stack control system using PLC based SCADA.

    Science.gov (United States)

    Cai, Baoping; Liu, Yonghong; Liu, Zengkai; Wang, Fei; Tian, Xiaojie; Zhang, Yanzhen

    2012-01-01

    An extremely reliable remote control system for subsea blowout preventer stack is developed based on the off-the-shelf triple modular redundancy system. To meet a high reliability requirement, various redundancy techniques such as controller redundancy, bus redundancy and network redundancy are used to design the system hardware architecture. The control logic, human-machine interface graphical design and redundant databases are developed by using the off-the-shelf software. A series of experiments were performed in laboratory to test the subsea blowout preventer stack control system. The results showed that the tested subsea blowout preventer functions could be executed successfully. For the faults of programmable logic controllers, discrete input groups and analog input groups, the control system could give correct alarms in the human-machine interface. Copyright © 2011 ISA. Published by Elsevier Ltd. All rights reserved.

  11. The Money Laundering Prevention System

    Directory of Open Access Journals (Sweden)

    Sonja Cindori

    2007-03-01

    Full Text Available The paper presents the money laundering and terrorist financing prevention system in Croatia. The basic concepts are defined, the principles and fundamentals of international regulations analysed, and the regulatory system in Croatia covered by statute and money laundering prevention Regulations is presented, in conjunction with a description of the organisation, remit and international actions of the Money Laundering Prevention Office.The infiltration of dirty money is a crucial problem from national economies. The purchase of shares, of real estate, the establishment of dirty investment funds and the use of the banking system for the embedding of such resources is a danger to the credibility of a whole country, and in particular to the security of the financial and banking system. Croatia has adopted statutory measures aimed at the effective detection and prevention of suspicious financial transactions, in other words the prevention of money laundering.Launderers constantly find new ways, make use of new non-financial channels and expand their activities to real estate, artworks and insurance. Hence it is necessary to keep up with European approaches and recommendations, to strive for further improvement of the laws and the modernisation of the system, and to adopt new regulations harmonised with international standards, particularly with Directive 2005/60/EC.

  12. Tanzania Health Information Technology (T-HIT) System: Pilot Test of a Tablet-Based System to Improve Prevention of Mother-to-Child Transmission of HIV.

    Science.gov (United States)

    Bull, Sheana; Thomas, Deborah Sk; Nyanza, Elias C; Ngallaba, Sospatro E

    2018-01-15

    The prevention of mother-to-child transmission (PMTCT) of HIV requires innovative solutions. Although routine monitoring is effective in some areas, standardized and easy-to-scale solutions to identify and monitor pregnant women, test them for HIV, and treat them and their children is still lacking. Mobile health (mHealth) offers opportunities for surveillance and reporting in rural areas of low- and middle-income countries. The aim of this study was to document the preliminary impacts of the Tanzania Health Information Technology (T-HIT) system mHealth intervention aimed at health workers for PMTCT care delivery and capacity building in a rural area of Tanzania. We developed T-HIT as a tablet-based system for an electronic data collection system designed to capture and report PMTCT data during antenatal, delivery, and postnatal visits in Misungwi, Tanzania. T-HIT was tested by health workers in a pilot randomized trial comparing seven sites using T-HIT assigned at random to seven control sites; all sites maintained standard paper record-keeping during the pilot intervention period. We compared numbers of antenatal visits, number of HIV tests administered, and women testing positive across all sites. Health workers recorded data from antenatal visits for 1530 women; of these, 695 (45.42%) were tested for HIV and 3.59% (55/1530) tested positive. Health workers were unable to conduct an HIV test for 103 women (6.73%, 103/1530) because of lack of reagent, which is not captured on paper logs. There was no difference in the activity level for testing when comparing sites T-HIT to non-T-HIT sites. We observed a significant postintervention increase in the numbers of women testing positive for HIV compared with the preintervention period (P=.04), but this was likely not attributable to the T-HIT system. T-HIT had a high degree of acceptability and feasibility and is perceived as useful by health workers, who documented more antenatal visits during the pilot intervention

  13. Tanzania Health Information Technology (T-HIT) System: Pilot Test of a Tablet-Based System to Improve Prevention of Mother-to-Child Transmission of HIV

    Science.gov (United States)

    Bull, Sheana; Nyanza, Elias C; Ngallaba, Sospatro E

    2018-01-01

    Background The prevention of mother-to-child transmission (PMTCT) of HIV requires innovative solutions. Although routine monitoring is effective in some areas, standardized and easy-to-scale solutions to identify and monitor pregnant women, test them for HIV, and treat them and their children is still lacking. Mobile health (mHealth) offers opportunities for surveillance and reporting in rural areas of low- and middle-income countries. Objective The aim of this study was to document the preliminary impacts of the Tanzania Health Information Technology (T-HIT) system mHealth intervention aimed at health workers for PMTCT care delivery and capacity building in a rural area of Tanzania. Methods We developed T-HIT as a tablet-based system for an electronic data collection system designed to capture and report PMTCT data during antenatal, delivery, and postnatal visits in Misungwi, Tanzania. T-HIT was tested by health workers in a pilot randomized trial comparing seven sites using T-HIT assigned at random to seven control sites; all sites maintained standard paper record-keeping during the pilot intervention period. We compared numbers of antenatal visits, number of HIV tests administered, and women testing positive across all sites. Results Health workers recorded data from antenatal visits for 1530 women; of these, 695 (45.42%) were tested for HIV and 3.59% (55/1530) tested positive. Health workers were unable to conduct an HIV test for 103 women (6.73%, 103/1530) because of lack of reagent, which is not captured on paper logs. There was no difference in the activity level for testing when comparing sites T-HIT to non-T-HIT sites. We observed a significant postintervention increase in the numbers of women testing positive for HIV compared with the preintervention period (P=.04), but this was likely not attributable to the T-HIT system. Conclusions T-HIT had a high degree of acceptability and feasibility and is perceived as useful by health workers, who documented more

  14. Increases in Recent HIV Testing Among Men Who Have Sex With Men Coincide With the Centers for Disease Control and Prevention's Expanded Testing Initiative

    Science.gov (United States)

    Cooley, Laura A.; Wejnert, Cyprian; Rose, Charles E.; Paz-Bailey, Gabriela; Taussig, Jennifer; Gern, Robert; Hoyte, Tamika; Salazar, Laura; White, Jianglan; Todd, Jeff; Bautista, Greg; Flynn, Colin; Sifakis, Frangiscos; German, Danielle; Isenberg, Debbie; Driscoll, Maura; Hurwitz, Elizabeth; Doherty, Rose; Wittke, Chris; Prachand, Nikhil; Benbow, Nanette; Melville, Sharon; Pannala, Praveen; Yeager, Richard; Sayegh, Aaron; Dyer, Jim; Sheu, Shane; Novoa, Alicia; Thrun, Mark; Al-Tayyib, Alia; Wilmoth, Ralph; Higgins, Emily; Griffin, Vivian; Mokotoff, Eve; MacMaster, Karen; Wolverton, Marcia; Risser, Jan; Rehman, Hafeez; Padgett, Paige; Bingham, Trista; Sey, Ekow Kwa; LaLota, Marlene; Metsch, Lisa; Forrest, David; Beck, Dano; Cardenas, Gabriel; Nemeth, Chris; Anderson, Bridget J.; Watson, Carol-Ann; Smith, Lou; Robinson, William T.; Gruber, DeAnn; Barak, Narquis; Murrill, Chris; Neaigus, Alan; Jenness, Samuel; Hagan, Holly; Reilly, Kathleen H.; Wendel, Travis; Cross, Helene; Bolden, Barbara; D'Errico, Sally; Wogayehu, Afework; Godette, Henry; Brady, Kathleen A.; Kirkland, Althea; Sifferman, Andrea; Miguelino-Keasling, Vanessa; Velasco, Al; Tovar, Veronica; Raymond, H. Fisher; De León, Sandra Miranda; Rolón-Colón, Yadira; Marzan, Melissa; Courogen, Maria; Jaenicke, Tom; Thiede, Hanne; Burt, Richard; Jia, Yujiang; Opoku, Jenevieve; Sansone, Marie; West, Tiffany; Magnus, Manya; Kuo, Irene

    2015-01-01

    According to National HIV Behavioral Surveillance system data, human immunodeficiency virus (HIV) testing increased among gay, bisexual, and other men who have sex with men from 2008 to 2011 in cities funded by the Centers for Disease Control and Prevention's Expanded Testing Initiative, suggesting that focused HIV testing initiatives might have positive effects. PMID:25352589

  15. Anti-Runaway Prevention System with Wireless Sensors for Intelligent Track Skates at Railway Stations

    Directory of Open Access Journals (Sweden)

    Chaozhe Jiang

    2017-12-01

    Full Text Available Anti-runaway prevention of rolling stocks at a railway station is essential in railway safety management. The traditional track skates for anti-runaway prevention of rolling stocks have some disadvantages since they are operated and monitored completely manually. This paper describes an anti-runaway prevention system (ARPS based on intelligent track skates equipped with sensors and real-time monitoring and management system. This system, which has been updated from the traditional track skates, comprises four parts: intelligent track skates, a signal reader, a database station, and a monitoring system. This system can monitor the real-time situation of track skates without changing their workflow for anti-runaway prevention, and thus realize the integration of anti-runaway prevention information management. This system was successfully tested and practiced at Sunjia station in Harbin Railway Bureau in 2014, and the results confirmed that the system showed 100% accuracy in reflecting the usage status of the track skates. The system could meet practical demands, as it is highly reliable and supports long-distance communication.

  16. Anti-Runaway Prevention System with Wireless Sensors for Intelligent Track Skates at Railway Stations.

    Science.gov (United States)

    Jiang, Chaozhe; Xu, Yibo; Wen, Chao; Chen, Dilin

    2017-12-19

    Anti-runaway prevention of rolling stocks at a railway station is essential in railway safety management. The traditional track skates for anti-runaway prevention of rolling stocks have some disadvantages since they are operated and monitored completely manually. This paper describes an anti-runaway prevention system (ARPS) based on intelligent track skates equipped with sensors and real-time monitoring and management system. This system, which has been updated from the traditional track skates, comprises four parts: intelligent track skates, a signal reader, a database station, and a monitoring system. This system can monitor the real-time situation of track skates without changing their workflow for anti-runaway prevention, and thus realize the integration of anti-runaway prevention information management. This system was successfully tested and practiced at Sunjia station in Harbin Railway Bureau in 2014, and the results confirmed that the system showed 100% accuracy in reflecting the usage status of the track skates. The system could meet practical demands, as it is highly reliable and supports long-distance communication.

  17. Uncovering Bugs in Distributed Storage Systems during Testing (not in Production!)

    OpenAIRE

    Deligiannis, P; McCutchen, M; Thomson, P; Chen, S; Donaldson, AF; Erickson, J; Huang, C; Lal, A; Mudduluru, R; Qadeer, S; Schulte, W

    2016-01-01

    Testing distributed systems is challenging due to multiple sources of nondeterminism. Conventional testing techniques, such as unit, integration and stress testing, are ineffective in preventing serious but subtle bugs from reaching production. Formal techniques, such as TLA+, can only verify high-level specifications of systems at the level of logic-based models, and fall short of checking the actual executable code. In this paper, we present a new methodology for testing distributed systems...

  18. Kilowatt Isotope Power System. Phase I. System test report. 78-KIPS-33

    International Nuclear Information System (INIS)

    1978-01-01

    The KIPS Ground Demonstration System (GDS) was designed to simulate, as closely as possible, a Flight System Conceptual Design (FSCD). No radiator was incorporated and electric heat sources were used in place of isotope heat sources. To minimize air in-leakage and to simulate heat losses associated with space operation, the system was operated in a vacuum chamber. Initial testing was performed on the development system which did not incorporate a high performance turbine or non-condensing configuration of the cold liquid passages in certain regenerator vapor regions. After testing of the development system and retrofit to the GDS configuration, which included improvements in the above two items, the GDS was installed in the test chamber. Testing to date showed the GDS configuration has demonstrated a system efficiency of greater than 15%. Satisfactory heat balances have been calculated on most system components, permitting evaluation of component performance. Certain performance deficiencies currently exist which prevented the 18% efficiency goal being attained. These can be corrected with further development

  19. For establishment on nuclear disaster prevention system

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    For increasing requirement of peoples for review of nuclear disaster countermeasure at a chance of the JCO critical accident, the Japanese Government newly established the 'Special Measure Act on Nuclear Disaster Countermeasure', which was enacted on July 16, 2000. The nuclear business relatives such as electric power company and so forth established the Business program on nuclear disaster prevention in nuclear business relatives' after their consultation with local communities at their construction, under their co-operation. Simultaneously, the electric power industry field decided to intend to provide some sufficient countermeasures to incidental formation of nuclear accident such as start of the Co-operative agreement on nuclear disaster prevention among the nuclear business relatives' and so forth. Here were described on nuclear safety and disaster prevention, nuclear disaster prevention systems at the electric power industry field, abstract on 'Business program on nuclear disaster prevention in nuclear business relatives', preparation of technical assistance system for nuclear disaster prevention, executive methods and subjects on nuclear disaster prevention at construction areas, recent business on nuclear disaster prevention at the Nuclear Technical Center, and subjects on establishment of nuclear disaster prevention system. (G.K.)

  20. Virtual system concept aiming at prevention of troubles and accidents

    International Nuclear Information System (INIS)

    Uchimoto, Tetsuya; Takagi, Toshiyuki

    2001-01-01

    A main impediment to optimization of the plant maintenance is the fact that we can not predict when and how troubles are introduced in a plant. Having regard to the point, the authors propose a 'virtual system' concept for prevention and prediction of accidents in plants. The virtual system is a system constructed in computers and it evaluates responses to various loads of the object system. The authors introduce the resistance to loads and the testing availability as key parameters characterizing object sub-systems and place their evaluation as the first step of construction of the virtual system. (author)

  1. The scenario-based system of workers training to prevent accidents during decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    Jeong, KwanSeong; Choi, ByungSeon; Moon, JeiKwon; Hyun, DongJun; Lee, JongHwan; Kim, IkJune; Kim, GeunHo; Seo, JaeSeok

    2014-01-01

    Highlights: • This paper is meant to develop the training system to prevent accidents during decommissioning of nuclear facilities. • Requirements of the system were suggested. • Data management modules of the system were designed. • The system was developed on virtual reality environment. - Abstract: This paper is meant to develop the training system to prevent accidents during decommissioning of nuclear facilities. Requirements of the system were suggested. Data management modules of the system were designed. The system was developed on virtual reality environment. The performance test of the system was proved to be appropriate to decommissioning of nuclear facilities

  2. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  3. Multiloop integral system test (MIST)

    International Nuclear Information System (INIS)

    Gloudemans, J.R.

    1989-07-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock and Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The individual tests are described in detail in Volumes 2 through 8 and Volume 11, and are summarized in Volume 1. Inter-group comparisons are addressed in this document, Volume 9. These comparisons are grouped as follows: mapping versus SBLOCA transients, SBLOCA, pump effects, and the effects of noncondensible gases. Appendix A provides an index and description of the microfiched plots for each test, which are enclosed with the corresponding Volumes 2 through 8. 147 figs., 5 tabs

  4. Automated systems help prevent operator error during [reactor] I and C [instrumentation and control] testing

    International Nuclear Information System (INIS)

    Courcoux, R.

    1989-01-01

    On a nuclear steam supply system, even a minor failure can involve actuation of the whole reactor protection system (RPS). To reduce the likelihood of human error leading to unwanted trips during the maintenance of instrumentation and control systems, Framatome has been developing and installing various automated testing systems. Such automated systems are particularly helpful when periodic tests with a potential for RPS actuation have to be carried out, or when the test is on the critical path for the refuelling outage. The Sensitive Channel Programme described is an example of the sort of work that has been done. (author)

  5. Improving rates of screening and prevention by leveraging existing information systems.

    Science.gov (United States)

    Neil, Nancy

    2003-11-01

    In 1997 Virginia Mason Health System (VMMC), a vertically integrated hospital and multispecialty group practice, had no process or system to deliver the right patient clinical data, in the right form, at the right place--when providers needed it for effective patient care. Without any new investment in technology, a work group of five individuals leveraged existing, primarily paper-based information systems to launch development and implementation of a provider prompting tool--a primary care and prevention (PCP) report--which prompted providers to complete screening, prevention, and disease management services at every patient appointment. The work group developed and pilot tested the report and created a mechanism by which the report could be delivered just in time before each patient's appointment. The report integrated information from independent appointment scheduling, laboratory results reporting, patient demographics, and billing data sources. MEASURING THE PCP REPORT'S IMPACT: The results of two separate analyses demonstrate improvement in rates of screening and prevention across VMMC soon after the PCP report became available. These results led senior leadership to make the PCP report's utilization a systemwide imperative. The PCP report is used by nearly all primary care providers as a prompt to complete screening, prevention, and disease management services at every patient appointment.

  6. HIV Prevention among Mexican Migrants at Different Migration Phases: Exposure to Prevention Messages and Association With Testing Behaviors

    Science.gov (United States)

    Martinez-Donate, Ana P.; Rangel, M. Gudelia; Zhang, Xiao; Simon, Norma-Jean; Rhoads, Natalie; Gonzalez-Fagoaga, J. Eduardo; Gonzalez, Ahmed Asadi

    2016-01-01

    Mobile populations are at increased risk for HIV infection. Exposure to HIV prevention messages at all phases of the migration process may help decrease im/migrants’ HIV risk. We investigated levels of exposure to HIV prevention messages, factors associated with message exposure, and the association between exposure to prevention messages and HIV testing behavior among Mexican im/migrants at different phases of the migration process. We conducted a cross-sectional, probability survey of Mexican im/migrants (N=3,149) traveling through the border city of Tijuana, Mexico. The results indicate limited exposure to prevention messages (57%–75%) and suboptimal last 12-month HIV testing rates (14%–25%) across five migration phases. Compared to pre-departure levels (75%), exposure to messages decreases at all post-departure migration phases (57%–63%, pmigration continuum. PMID:26595267

  7. Overload prevention in model supports for wind tunnel model testing

    Directory of Open Access Journals (Sweden)

    Anton IVANOVICI

    2015-09-01

    Full Text Available Preventing overloads in wind tunnel model supports is crucial to the integrity of the tested system. Results can only be interpreted as valid if the model support, conventionally called a sting remains sufficiently rigid during testing. Modeling and preliminary calculation can only give an estimate of the sting’s behavior under known forces and moments but sometimes unpredictable, aerodynamically caused model behavior can cause large transient overloads that cannot be taken into account at the sting design phase. To ensure model integrity and data validity an analog fast protection circuit was designed and tested. A post-factum analysis was carried out to optimize the overload detection and a short discussion on aeroelastic phenomena is included to show why such a detector has to be very fast. The last refinement of the concept consists in a fast detector coupled with a slightly slower one to differentiate between transient overloads that decay in time and those that are the result of aeroelastic unwanted phenomena. The decision to stop or continue the test is therefore conservatively taken preserving data and model integrity while allowing normal startup loads and transients to manifest.

  8. An Integration Testing Facility for the CERN Accelerator Controls System

    CERN Document Server

    Stapley, N; Bau, J C; Deghaye, S; Dehavay, C; Sliwinski, W; Sobczak, M

    2009-01-01

    A major effort has been invested in the design, development, and deployment of the LHC Control System. This large control system is made up of a set of core components and dependencies, which although tested individually, are often not able to be tested together on a system capable of representing the complete control system environment, including hardware. Furthermore this control system is being adapted and applied to CERN's whole accelerator complex, and in particular for the forthcoming renovation of the PS accelerators. To ensure quality is maintained as the system evolves, and toimprove defect prevention, the Controls Group launched a project to provide a dedicated facility for continuous, automated, integration testing of its core components to incorporate into its production process. We describe the project, initial lessons from its application, status, and future directions.

  9. Validation of Safety-Critical Systems for Aircraft Loss-of-Control Prevention and Recovery

    Science.gov (United States)

    Belcastro, Christine M.

    2012-01-01

    Validation of technologies developed for loss of control (LOC) prevention and recovery poses significant challenges. Aircraft LOC can result from a wide spectrum of hazards, often occurring in combination, which cannot be fully replicated during evaluation. Technologies developed for LOC prevention and recovery must therefore be effective under a wide variety of hazardous and uncertain conditions, and the validation framework must provide some measure of assurance that the new vehicle safety technologies do no harm (i.e., that they themselves do not introduce new safety risks). This paper summarizes a proposed validation framework for safety-critical systems, provides an overview of validation methods and tools developed by NASA to date within the Vehicle Systems Safety Project, and develops a preliminary set of test scenarios for the validation of technologies for LOC prevention and recovery

  10. Preventive maintenance and the interval availability distribution of an unreliable production system

    International Nuclear Information System (INIS)

    Dijkhuizen, G. van; Heijden, M. van der

    1999-01-01

    Traditionally, the optimal preventive maintenance interval for an unreliable production system has been determined by maximizing its limiting availability. Nowadays, it is widely recognized that this performance measure does not always provide relevant information for practical purposes. This is particularly true for order-driven manufacturing systems, in which due date performance has become a more important, and even a competitive factor. Under these circumstances, the so-called interval availability distribution is often seen as a more appropriate performance measure. Surprisingly enough, the relation between preventive maintenance and interval availability has received little attention in the existing literature. In this article, a series of mathematical models and optimization techniques is presented, with which the optimal preventive maintenance interval can be determined from an interval availability point of view, rather than from a limiting availability perspective. Computational results for a class of representative test problems indicate that significant improvements of up to 30% in the guaranteed interval availability can be obtained, by increasing preventive maintenance frequencies somewhere between 10 and 70%

  11. [Disinfectants and main sanitary and preventive measures for protection of ventilation and air-conditioning systems from Legionella contamination].

    Science.gov (United States)

    Gerasimov, V N; Golov, E A; Khramov, M V; Diatlov, I A

    2008-01-01

    The study was devoted to selection and assessment of disinfecting preparations for prevention of contamination by Legionella. Using system of criteria for quality assessment of disinfectants, seven newdomestic ones belonging to quaternary ammonium compounds class or to oxygen-containing preparations and designed for disinfecting of air-conditioning and ventilation systems were selected. Antibacterial and disinfecting activities of working solutions of disinfectants were tested in laboratory on the test-surfaces and test-objects of premises' air-conditioning and ventilation systems contaminated with Legionella. High antimicrobial and disinfecting activity of new preparations "Dezactiv-M", "ExtraDez", "Emital-Garant", "Aquasept Plus", "Samarovka", "Freesept", and "Ecobreeze Oxy" during their exposure on objects and materials contaminated with Legionella was shown. Main sanitary and preventive measures for defending of air-conditioning and ventilation systems from contamination by Legionella species were presented.

  12. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  13. Relationship between a Centers for Disease Control and Prevention expanded HIV testing initiative and past-year testing by race/ethnicity: a multilevel analysis of the Behavioral Risk Factor Surveillance System.

    Science.gov (United States)

    Gaines, Tommi L; Caldwell, Julia T; Ford, Chandra L; Mulatu, Mesfin S; Godette, Dionne C

    2016-01-01

    The Centers for Disease Control and Prevention's (CDC) expanded testing initiative (ETI) aims to bolster HIV testing among populations disproportionately affected by the HIV epidemic by providing additional funding to health departments serving these communities. ETI prioritizes testing in clinical settings; therefore, we examined the relationship between state-level ETI participation and past-year HIV testing among a racially/ethnically diverse sample of adult respondents to the 2012 Behavioral Risk Factor Surveillance System who accessed health services within the 12 months prior to being interviewed. Controlling for individual- and state-level characteristics in a multilevel logistic regression model, ETI participation was independently and positively associated with past-year testing, but this association varied by race/ethnicity. Hispanics had higher odds (adjusted odds ratio [AOR]: 1.49; 95% CI: 1.11-2.02) and American Indian/Alaska Natives had lower odds (AOR: 0.66; 95% CI: 0.43-0.99) of testing if they resided in states with (vs. without) ETI participation. State-level ETI participation did not significantly alter past-year testing among other racial/ethnic groups. Prioritizing public health resources in states most affected by HIV can improve testing patterns, but other mechanisms likely influence which racial/ethnic groups undergo testing.

  14. Intrusion Detection amp Prevention Systems - Sourcefire Snort

    Directory of Open Access Journals (Sweden)

    Rajesh Vuppala

    2015-08-01

    Full Text Available Information security is a challenging issue for all business organizations today amidst increasing cyber threats. While there are many alternative intrusion detection amp prevention systems available to choose from selecting the best solution to implement to detect amp prevent cyber-attacks is a difficult task. The best solution is of the one that gets the best reviews and suits the organizations needs amp budget. In this review paper we summarize various classes of intrusion detection and prevention systems compare features of alternative solutions and make recommendation for implementation of one as the best solution for business organization in Fiji.

  15. Endogenous information, adverse selection, and prevention: Implications for genetic testing policy.

    Science.gov (United States)

    Peter, Richard; Richter, Andreas; Thistle, Paul

    2017-09-01

    We examine public policy toward the use of genetic information by insurers. Individuals engage in unobservable primary prevention and have access to different prevention technologies. Thus, insurance markets are affected by moral hazard and adverse selection. Individuals can choose to take a genetic test to acquire information about their prevention technology. Information has positive decision-making value, that is, individuals may adjust their behavior based on the result of the test. However, testing also exposes individuals to uncertainty over the available insurance contract, so-called classification risk, which lowers the value of information. In our analysis we distinguish between four different policy regimes, determine the value of information under each regime and associated equilibrium outcomes on the insurance market. We show that the policy regimes can be Pareto ranked, with a duty to disclose being the preferred regime and an information ban the least preferred one. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    Science.gov (United States)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  17. Public attitudes towards preventive genomics and personal interest in genetic testing to prevent disease: a survey study

    NARCIS (Netherlands)

    Vermeulen, E.; Henneman, L.; van El, C.G.; Cornel, M.C.

    2014-01-01

    Background: Genetic testing and family history assessment can be used as an aid in the prevention of common chronic diseases. The aim of this study was to determine public attitudes and interests towards offering genetic testing and family history-based risk assessment for common chronic disease

  18. Centers for Disease Control and Prevention Funding for HIV Testing Associated With Higher State Percentage of Persons Tested.

    Science.gov (United States)

    Hayek, Samah; Dietz, Patricia M; Van Handel, Michelle; Zhang, Jun; Shrestha, Ram K; Huang, Ya-Lin A; Wan, Choi; Mermin, Jonathan

    2015-01-01

    To assess the association between state per capita allocations of Centers for Disease Control and Prevention (CDC) funding for HIV testing and the percentage of persons tested for HIV. We examined data from 2 sources: 2011 Behavioral Risk Factor Surveillance System and 2010-2011 State HIV Budget Allocations Reports. Behavioral Risk Factor Surveillance System data were used to estimate the percentage of persons aged 18 to 64 years who had reported testing for HIV in the last 2 years in the United States by state. State HIV Budget Allocations Reports were used to calculate the state mean annual per capita allocations for CDC-funded HIV testing reported by state and local health departments in the United States. The association between the state fixed-effect per capita allocations for CDC-funded HIV testing and self-reported HIV testing in the last 2 years among persons aged 18 to 64 years was assessed with a hierarchical logistic regression model adjusting for individual-level characteristics. The percentage of persons tested for HIV in the last 2 years. In 2011, 18.7% (95% confidence interval = 18.4-19.0) of persons reported being tested for HIV in last 2 years (state range, 9.7%-28.2%). During 2010-2011, the state mean annual per capita allocation for CDC-funded HIV testing was $0.34 (state range, $0.04-$1.04). A $0.30 increase in per capita allocation for CDC-funded HIV testing was associated with an increase of 2.4 percentage points (14.0% vs 16.4%) in the percentage of persons tested for HIV per state. Providing HIV testing resources to health departments was associated with an increased percentage of state residents tested for HIV.

  19. A Decision Support System for Preventing Falls in Elderly People

    Directory of Open Access Journals (Sweden)

    Estelle Courtial

    2015-12-01

    Full Text Available Preventing falls in older people is a real challenge for Public Health. This paper addresses this issue by designing a decision support system which provides a fall risk index. The proposed approach is based on three selected tests (the Timed up and go (TUG, the 30s sit-to-stand and the 4-stage balance tests, which are widely used in the medical sector for assessing mobility and balance of the elderly. During the tests, a video records the older person performing the test and thanks to an image processing algorithm, kinematics and biomechanics parameters are extracted. Based on fuzzy logic, a decision support system fuses all these data and estimates a fall risk index according to the senior's age and gender. It can also assist the Health Professional in making improved medical diagnosis relied on targeted measurements. Simulation results drawing on experimental data of 12 older persons performing the TUG test illustrate the feasibility and the effectiveness of the proposed approach. Objectively assessing the senior's motor functions and the fall risk is possible in less than 10 minutes, at low cost and in an easy and non invasive way.

  20. Pilot testing of a burn prevention teaching tool for Amish children.

    Science.gov (United States)

    Rieman, Mary T; Kagan, Richard J

    2012-01-01

    Burn prevention education for Amish children is warranted as there are unique risks associated with the Amish lifestyle. Specific educational opportunities are related to scalds, ignition of clothing, and ignition of highly flammable materials. A culturally sensitive burn prevention teaching tool, consisting of a magnetic storyboard, burn safety curriculum, and tests, was developed with the cooperation of one Old Order Amish community. The purpose of this study was to test the effectiveness of the tool in an Amish school. The teacher obtained parental permission and informed assent for the participation of the children. Pretesting was completed before the lessons began. The teacher told stories and arranged the magnets on the storyboard to show burn hazards involving lighters, stoves, kerosene heaters, gasoline-powered engines, and hot liquids used for canning, butchering, mopping, washing clothes, and making lye soap. The children were challenged to rearrange the pieces for a safer situation. Posttesting was performed 2 months after the pretest. Twenty-seven students (grades 1-8) participated. Tests were scored as a percentage of the 33 items answered correctly. The mean pretest score was 62 and the mean posttest score was 83. Statistical analysis using paired t-test demonstrated a highly significant improvement in test scores (P < .0001), with a power of more than 99%. This pilot study demonstrated that the burn prevention teaching tool was effective for improving knowledge in one classroom of Amish children. These results support expanded use and testing of this tool in other Amish schools.

  1. Web-based expert system for foundry pollution prevention

    Science.gov (United States)

    Moynihan, Gary P.

    2004-02-01

    Pollution prevention is a complex task. Many small foundries lack the in-house expertise to perform these tasks. Expert systems are a type of computer information system that incorporates artificial intelligence. As noted in the literature, they provide a means of automating specialized expertise. This approach may be further leveraged by implementing the expert system on the internet (or world-wide web). This will allow distribution of the expertise to a variety of geographically-dispersed foundries. The purpose of this research is to develop a prototype web-based expert system to support pollution prevention for the foundry industry. The prototype system identifies potential emissions for a specified process, and also provides recommendations for the prevention of these contaminants. The system is viewed as an initial step toward assisting the foundry industry in better meeting government pollution regulations, as well as improving operating efficiencies within these companies.

  2. Commercial Skills Test Information Management System (CSTIMS) final report and self-sustainability plan.

    Science.gov (United States)

    2014-03-01

    The Commercial Skills Test Information Management System (CSTIMS) was developed as a Web-based, software-as-a-service system to prevent and deter fraud perpetrated by third-party commercial drivers license (CDL) examiners in the portion of the CDL...

  3. An expert system for prevention of abnormal event recurrence

    International Nuclear Information System (INIS)

    Nishiyama, Takuya

    1990-01-01

    A huge amount of information related to abnormal events occurring in nuclear power plants in Japan and abroad is collected and accumulated in the Nuclear Information Center at CRIEPI. This information contains a variety of knowledge which may be useful for prevention of similar trouble. An expert system named, 'Consultation System for Prevention of Abnormal-Event Recurrence (CSPAR) is being developed with the objective of preventing recurrence of similar abnormal events by offering an effective means of utilizing such knowledge. This paper presents the key points in designing and constructing the system, the system functional outline, and some demonstration examples. (author)

  4. Design and Evaluation of a Pressure and Temperature Monitoring System for Pressure Ulcer Prevention

    Directory of Open Access Journals (Sweden)

    Farve Daneshvar Fard

    2014-08-01

    Full Text Available Introduction Pressure ulcers are tissue damages resulting from blood flow restriction, which occurs when the tissue is exposed to high pressure for a long period of time. These painful sores are common in patients and elderly, who spend extended periods of time in bed or wheelchair. In this study, a continuous pressure and temperature monitoring system was developed for pressure ulcer prevention. Materials and Methods The monitoring system consists of 64 pressure and 64 temperature sensors on a 40×50 cm2 sheet. Pressure and temperature data and the corresponding maps were displayed on a computer in real-time. Risk assessment could be performed by monitoring and recording absolute pressure and temperature values, as well as deviations over time. Furthermore, a posture detection procedure was proposed for sitting posture identification. Information about the patient’s movement history may help caregivers make informed decisions about the patient’s repositioning and ulcer prevention strategies. Results Steady temporal behaviour of the designed system and repeatability of the measurements were evaluated using several particular tests. The results illustrated that the system could be utilized for continuous monitoring of interface pressure and temperature for pressure ulcer prevention. Furthermore, the proposed method for detecting sitting posture was verified using a statistical analysis. Conclusion A continuous time pressure and temperature monitoring system was presented in this study. This system may be suited for pressure ulcer prevention given its feasibility for simultaneous monitoring of pressure and temperature and alarming options. Furthermore, a method for detecting different sitting postures was proposed and verified. Pressure ulcers in wheelchair-bound patients may be prevented using this sitting posture detection method.

  5. Report `A field test project for the disaster prevention type photovoltaic power generation (Kobe city, Hyogo prefecture)`; `Bosaigata taiyoko hatsuden field test jigyo (Hyogoken Kobeshi)` hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-12

    An experiment was conducted on the introduction of the disaster prevention type photovoltaic power system provided with storage batteries to public facilities, etc., considering not only the use of new energy from the environmental aspect, but the emergency use. In fiscal 1995, 5kW-output photovoltaic power systems were installed on the rooftop of Hiyodori and Takamaru regional welfare centers and a 30kW photovoltaic power system on the rooftop of the Hyogo Ward Office. Demonstrative tests of these systems started for collection of various data. Now that the systems were installed at the regional welfare center managed mostly by regional citizens and the ward office which is an administrative office familiar with regional residents, the understanding of and familiarity with the photovoltaic power system were obtained from regional residents, and also people were enlightened on the use of solar energy in such a point as economization of power rates using the interconnected power system. Further, for life supports, it was made possible to secure minimum electric power in emergency and to secure functions of disaster prevention spots. 3 figs.

  6. A Method for Modeling the Virtual Instrument Automatic Test System Based on the Petri Net

    Institute of Scientific and Technical Information of China (English)

    MA Min; CHEN Guang-ju

    2005-01-01

    Virtual instrument is playing the important role in automatic test system. This paper introduces a composition of a virtual instrument automatic test system and takes the VXIbus based a test software platform which is developed by CAT lab of the UESTC as an example. Then a method to model this system based on Petri net is proposed. Through this method, we can analyze the test task scheduling to prevent the deadlock or resources conflict. At last, this paper analyzes the feasibility of this method.

  7. Testing the Quality Health Outcomes Model Applied to Infection Prevention in Hospitals.

    Science.gov (United States)

    Gilmartin, Heather M; Sousa, Karen H

    2016-01-01

    To test the Quality Health Outcomes Model to investigate the relationship between health care-associated infection (HAI) prevention interventions, organizational context, and HAI outcomes using structural equation modeling. Variables for adherence to the central line bundle, organizational context, and central line-associated bloodstream infections (CLABSIs) were selected for this secondary data analysis from 614 US hospitals that participated in the Prevention of Nosocomial Infection and Cost-effectiveness-Refined study. One half of the dataset was used for exploration of the concepts, the second half for confirmation of the measurement models and testing of the structural model. The final model resulted in a good fit to the data (χ (1215) = 1906.86, P preventing HAIs, ongoing research is needed to reveal the exact aspects of context that influence interventions and outcomes.

  8. Designing System Reforms: Using a Systems Approach to Translate Incident Analyses into Prevention Strategies

    Science.gov (United States)

    Goode, Natassia; Read, Gemma J. M.; van Mulken, Michelle R. H.; Clacy, Amanda; Salmon, Paul M.

    2016-01-01

    Advocates of systems thinking approaches argue that accident prevention strategies should focus on reforming the system rather than on fixing the “broken components.” However, little guidance exists on how organizations can translate incident data into prevention strategies that address the systemic causes of accidents. This article describes and evaluates a series of systems thinking prevention strategies that were designed in response to the analysis of multiple incidents. The study was undertaken in the led outdoor activity (LOA) sector in Australia, which delivers supervised or instructed outdoor activities such as canyoning, sea kayaking, rock climbing and camping. The design process involved workshops with practitioners, and focussed on incident data analyzed using Rasmussen's AcciMap technique. A series of reflection points based on the systemic causes of accidents was used to guide the design process, and the AcciMap technique was used to represent the prevention strategies and the relationships between them, leading to the creation of PreventiMaps. An evaluation of the PreventiMaps revealed that all of them incorporated the core principles of the systems thinking approach and many proposed prevention strategies for improving vertical integration across the LOA system. However, the majority failed to address the migration of work practices and the erosion of risk controls. Overall, the findings suggest that the design process was partially successful in helping practitioners to translate incident data into prevention strategies that addressed the systemic causes of accidents; refinement of the design process is required to focus practitioners more on designing monitoring and feedback mechanisms to support decisions at the higher levels of the system. PMID:28066296

  9. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  10. Environmental testing of a prototypic digital safety channel, phase I: System design and test methodology

    International Nuclear Information System (INIS)

    Korsah, K.; Turner, G.W.; Mullens, J.A.

    1995-01-01

    A microprocessor-based reactor trip channel has been assembled for environmental testing under an Instrumentation and Control (I ampersand C) Qualification Program sponsored by the U.S. Nuclear Regulatory Commission. The goal of this program is to establish the technical basis for the qualification of advanced I ampersand C systems. The trip channel implemented for this study employs technologies and digital subsystems representative of those proposed for use in some advanced light-water reactors (ALNWS) such as the Simplified Boiling Water Reactor (SBNW) and AP600. It is expected that these tests will reveal any potential system vulnerabilities for technologies representative of those proposed for use in ALNWS. The experimental channel will be purposely stressed considerably beyond what it is likely to experience in a normal nuclear power plant environment, so that the tests can uncover the worst-case failure modes (i.e., failures that are likely to prevent an entire trip system from performing its safety function when required to do so). Based on information obtained from this study, it may be possible to recommend tests that are likely to indicate the presence of such failure mechanisms. Such recommendations would be helpful in augmenting current qualification guidelines

  11. Environmental testing of a prototypic digital safety channel, Phase I: System design and test methodology

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Turner, G.W.; Mullens, J.A. [Oak Ridge National Lab., TN (United States)

    1995-04-01

    A microprocessor-based reactor trip channel has been assembled for environmental testing under an Instrumentation and Control (I&C) Qualification Program sponsored by the US Nuclear Regulatory Commission. The goal of this program is to establish the technical basis and acceptance criteria for the qualification of advanced I&C systems. The trip channel implemented for this study employs technologies and digital subsystems representative of those proposed for use in some advanced light-water reactors (ALWRs) such as the Simplified Boiling Water Reactor (SBWR). It is expected that these tests will reveal any potential system vulnerabilities for technologies representative of those proposed for use in ALWRs. The experimental channel will be purposely stressed considerably beyond what it is likely to experience in a normal nuclear power plant environment, so that the tests can uncover the worst-case failure modes (i.e., failures that are likely to prevent an entire trip system from performing its safety function when required to do so). Based on information obtained from this study, it may be possible to recommend tests that are likely to indicate the presence of such failure mechanisms. Such recommendations would be helpful in augmenting current qualification guidelines.

  12. Advancing the application of systems thinking in health: why cure crowds out prevention.

    Science.gov (United States)

    Bishai, David; Paina, Ligia; Li, Qingfeng; Peters, David H; Hyder, Adnan A

    2014-06-16

    This paper presents a system dynamics computer simulation model to illustrate unintended consequences of apparently rational allocations to curative and preventive services. A modeled population is subject to only two diseases. Disease A is a curable disease that can be shortened by curative care. Disease B is an instantly fatal but preventable disease. Curative care workers are financed by public spending and private fees to cure disease A. Non-personal, preventive services are delivered by public health workers supported solely by public spending to prevent disease B. Each type of worker tries to tilt the balance of government spending towards their interests. Their influence on the government is proportional to their accumulated revenue. The model demonstrates effects on lost disability-adjusted life years and costs over the course of several epidemics of each disease. Policy interventions are tested including: i) an outside donor rationally donates extra money to each type of disease precisely in proportion to the size of epidemics of each disease; ii) lobbying is eliminated; iii) fees for personal health services are eliminated; iv) the government continually rebalances the funding for prevention by ring-fencing it to protect it from lobbying.The model exhibits a "spend more get less" equilibrium in which higher revenue by the curative sector is used to influence government allocations away from prevention towards cure. Spending more on curing disease A leads paradoxically to a higher overall disease burden of unprevented cases of disease B. This paradoxical behavior of the model can be stopped by eliminating lobbying, eliminating fees for curative services, and ring-fencing public health funding. We have created an artificial system as a laboratory to gain insights about the trade-offs between curative and preventive health allocations, and the effect of indicative policy interventions. The underlying dynamics of this artificial system resemble features of

  13. Spacecraft Testing Programs: Adding Value to the Systems Engineering Process

    Science.gov (United States)

    Britton, Keith J.; Schaible, Dawn M.

    2011-01-01

    Testing has long been recognized as a critical component of spacecraft development activities - yet many major systems failures may have been prevented with more rigorous testing programs. The question is why is more testing not being conducted? Given unlimited resources, more testing would likely be included in a spacecraft development program. Striking the right balance between too much testing and not enough has been a long-term challenge for many industries. The objective of this paper is to discuss some of the barriers, enablers, and best practices for developing and sustaining a strong test program and testing team. This paper will also explore the testing decision factors used by managers; the varying attitudes toward testing; methods to develop strong test engineers; and the influence of behavior, culture and processes on testing programs. KEY WORDS: Risk, Integration and Test, Validation, Verification, Test Program Development

  14. HIV prevention and education in state prison systems: an update.

    Science.gov (United States)

    Lyons, Thomas; Osunkoya, Emmanuel; Anguh, Ivonne; Adefuye, Adedeji; Balogun, Joseph

    2014-04-01

    The prevalence rate of HIV infection in jails and prisons is approximately 5 times the rate in the U.S. general population. The authors surveyed state prison officials to assess HIV testing and HIV prevention policies--specifically voluntary testing, group HIV prevention counseling, and peer education--in the 50 states and to determine whether those policies are associated with the characteristics of the state and its prison population.

  15. DOE's Pollution Prevention Information Clearinghouse (EPIC)

    International Nuclear Information System (INIS)

    Otis, P.T.

    1994-05-01

    The US Department of Energy's (DOE's) Pollution Prevention Information Clearinghouse (EPIC) is a computer system intended for the exchange of pollution prevention information DOE-wide. EPIC is being developed as a distributed system that will allow access to other databases and applications. The first prototype of EPIC (Prototype I) was put on-line in January 1994. Prototype I contains information on EM-funded pollution prevention projects; relevant laws, regulations, guidance, and policy; facility and DOE contacts; and meetings and conferences. Prototype I also gives users access to the INEL Hazardous Solvent Substitution Data System (HSSDS) and to information contained on the US Environmental Protection Agency's (EPNS) Pollution Prevention Infbrmation Exchange System (PIES) as a test of the distributed system concept. An initial user group of about 35 is testing and providing feedback on Prototype I. Prototype II, with a Graphical User Interface (GUI), is planned for the end of CY94. This paper describes the current state of EPIC in terms of architecture, user interface, and information content. Plans for Prototype II and the final system are then discussed. The EPIC development effort is being coordinated with EPA and US Department of Defense (DoD) efforts to develop or upgrade their pollution prevention information exchange systems

  16. Early Prevention Method for Power Systems Instability

    DEFF Research Database (Denmark)

    Dmitrova, Evgenia

    containing no voltage sources). The main functionality of the early prevention method is to deliver control solution allowing escape from instability on the basis of data obtained by PMU measurements. The developed algorithm performs identification of the optimal node for countermeasure application...... instability was created. Utilizing synthetic PMU data, the early prevention method proposed a location and an amount of the countermeasure which will prevent instability; the prediction of the resulting stability margins corresponding to application of the suggested countermeasure was carried out....... The predicted effect of the suggested countermeasure application is in a good agreement with the results obtained by RMS dynamic simulation. Developed method enables adaptive preventive control for near real-time stability maintenance. The achieved results are opening promising perspective for power system...

  17. Recent Ground Hold and Rapid Depressurization Testing of Multilayer Systems

    Science.gov (United States)

    Johnson, Wesley L.

    2014-01-01

    In the development of flight insulation systems for large cryogenic orbital storage (spray on foam and multilayer insulation), testing need include all environments that are experienced during flight. While large efforts have been expended on studying, bounding, and modeling the orbital performance of the insulation systems, little effort has been expended on the ground hold and ascent phases of a mission. Historical cryogenic in-space systems that have flown have been able to ignore these phases of flight due to the insulation system being within a vacuum jacket. In the development phase of the Nuclear Mars Vehicle and the Shuttle Nuclear Vehicle, several insulation systems were evaluated for the full mission cycle. Since that time there had been minimal work on these phases of flight until the Constellation program began investigating cryogenic service modules and long duration upper stages. With the inception of the Cryogenic Propellant Storage and Transfer Technology Demonstration Mission, a specific need was seen for the data and as such, several tests were added to the Cryogenic Boil-off Reduction System liquid hydrogen test matrix to provide more data on a insulation system. Testing was attempted with both gaseous nitrogen (GN2) and gaseous helium (GHe) backfills. The initial tests with nitrogen backfill were not successfully completed due to nitrogen liquefaction and solidification preventing the rapid pumpdown of the vacuum chamber. Subsequent helium backfill tests were successful and showed minimal degradation. The results are compared to the historical data.

  18. Genetic testing for exercise prescription and injury prevention: AIS-Athlome consortium-FIMS joint statement.

    Science.gov (United States)

    Vlahovich, Nicole; Hughes, David C; Griffiths, Lyn R; Wang, Guan; Pitsiladis, Yannis P; Pigozzi, Fabio; Bachl, Nobert; Eynon, Nir

    2017-11-14

    There has been considerable growth in basic knowledge and understanding of how genes are influencing response to exercise training and predisposition to injuries and chronic diseases. On the basis of this knowledge, clinical genetic tests may in the future allow the personalisation and optimisation of physical activity, thus providing an avenue for increased efficiency of exercise prescription for health and disease. This review provides an overview of the current status of genetic testing for the purposes of exercise prescription and injury prevention. As such there are a variety of potential uses for genetic testing, including identification of risks associated with participation in sport and understanding individual response to particular types of exercise. However, there are many challenges remaining before genetic testing has evidence-based practical applications; including adoption of international standards for genomics research, as well as resistance against the agendas driven by direct-to-consumer genetic testing companies. Here we propose a way forward to develop an evidence-based approach to support genetic testing for exercise prescription and injury prevention. Based on current knowledge, there is no current clinical application for genetic testing in the area of exercise prescription and injury prevention, however the necessary steps are outlined for the development of evidence-based clinical applications involving genetic testing.

  19. Small test SDHW systems

    DEFF Research Database (Denmark)

    Vejen, Niels Kristian

    1999-01-01

    Three small test SDHW systems was tested in a laboratory test facility.The three SDHW systems where all based on the low flow principe and a mantle tank but the design of the systems where different.......Three small test SDHW systems was tested in a laboratory test facility.The three SDHW systems where all based on the low flow principe and a mantle tank but the design of the systems where different....

  20. Background of the system analysis of crime prevention of properties of criminality

    Directory of Open Access Journals (Sweden)

    Валерій Федорович Оболенцев

    2016-01-01

    Full Text Available Raising of problem. Socio-economic processes in Ukraine in the last years require scientific researches which would become the proper theoretical subsoil of reformation of the law-enforcement system. Actuality of theme. Consider perspective a system method in researches of criminology. The analysis of the systems of law-enforcement sphere to this time remains actually not developed. An analysis of the last publications is in this sphere. Researches, where on principles of system method prevention of criminality would be examined, in domestic criminology relatively a bit. O. E. Manokha in dissertation in criminology did an author expound the analysis of «Systems results it system criminology to the analysis in number high-quality indexes of criminality in Ukraine for period 1972 - 1995 y., showed the system of its connections with practice of prevention of crimes. O. Frolova. on principles of the systems exposed practice of criminal punishments in Ukraine. Author  specified that efficiency them separate kinds are not identical and system depends on many social factors. Purpose of the article. The аim of article is to presents the results of a systematic analysis of the formal procedures prevent crime in Ukraine. Exposition of basic material. The purpose of crime prevention as an artificial system is defined as the absence of crime - penal violations of existing social relations, preservation of the latter. Purpose of the system of crime prevention - keeping people from violating the legitimate social relations, blockades or start a potential criminal activity. For a system of crime prevention functions can be considered a means of keeping the population from criminal acts and termination initiated criminal attacks. The problem of crime prevention system - inconsistency functions, parameters and structure of the system to its destination. Context of the system of crime prevention - a modern Ukrainian society. Virtual border crime prevention

  1. A pollution prevention chargeback system at Sandia National Laboratories, New Mexico

    International Nuclear Information System (INIS)

    Davis, R.; Fish, J.; Brown, C.

    1994-08-01

    Sandia National Laboratories, New Mexico (Sandia/NM) has successfully developed and implemented a chargeback system to fund the implementation of Pollution Prevention activities. In the process of establishing this system, many valuable lessons have been learned. This paper describes how the chargeback system currently functions, the benefits and drawbacks of implementing such a system, and recommendations for implementing a chargeback system at other facilities. The initial goals in establishing a chargeback system were to create (1) funding for pollution prevention implementation, including specific pollution prevention projects; and (2) awareness on the part of the line organizations of the quantities and types of waste that they generate, thus providing them with a direct incentive to reduce that waste. The chargeback system inputs waste generation data and then filters and sorts the data to serve two purposes: (1) the operation of the chargeback system; and (2) the detailed waste generation reporting used for assessing processes and identifying pollution prevention opportunities

  2. A study on effective system depressurization during a PWR vessel bottom break LOCA with HPI failure and gas inflow prevention. ROSA-V/LSTF test SB-PV-05

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Takeda, Takeshi; Asaka, Hideaki; Nakamura, Hideo

    2006-11-01

    A small break loss-of-coolant accident (SBLOCA) experiment was conducted at the Large Scale Test Facility (LSTF) of ROSA-V program to study effects of accident management (AM) measures on core cooling, which are important in case of total failure of high pressure injection (HPI) system during an SBLOCA at a pressurized water reactor (PWR). The LSTF is a full-height and 1/48 volume-scaled facility simulating a 4-loop Westinghouse-type PWR (3423 MWt). The experiment, SB-PV-05, simulated a PWR vessel bottom SBLOCA with a rupture of nine instrument tubes, which is equivalent to 0.18% cold leg break. It is clarified that AM actions with steam generator (SG) depressurization to achieve a primary loop cooling rate at -55 K/h and auxiliary feedwater supply for 30 minutes are effective to avoid core uncovery by actuating the low pressure injection (LPI) system. It is also shown through the comparison with the previous experiment of SB-PV-03 that prevention of non-condensable gas inflow from the accumulator injection system (AIS) is very important to actuate the LPI to achieve adequate core cooling. This report presents experiment results of SB-PV-05 in detail and shows the effects of gas inflow prevention on core cooling through the estimation of primary coolant mass and energy balance in the primary system. (author)

  3. Safeguards system testing WSRC Insider Exercise Program (U)

    International Nuclear Information System (INIS)

    Robichaux, J.J.

    1991-01-01

    One of the major concerns related to the control and accountability of nuclear material located at DOE facilities is the theft or diversion of material by an insider. Many complex safeguards and security systems have been installed to provide timely detection and prevention of the removal of nuclear materials. The Westinghouse Savannah River Company's (WSRC) Material Control and Accountability (MC and A) section has implemented an insider exercise program designed to evaluate the effectiveness of these safeguards systems. Exercises consist of limited scope performance test. This paper describes the structure and controls for the insider exercise program at the Savannah River Site, the lessons learned over the past several years, and methods being utilized to improve the program

  4. Overview study of LNG release prevention and control systems

    Energy Technology Data Exchange (ETDEWEB)

    Pelto, P.J.; Baker, E.G.; Holter, G.M.; Powers, T.B.

    1982-03-01

    The liquefied natural gas (LNG) industry employs a variety of release prevention and control techniques to reduce the likelihood and the consequences of accidental LNG releases. A study of the effectiveness of these release prevention and control systems is being performed. Reference descriptions for the basic types of LNG facilities were developed. Then an overview study was performed to identify areas that merit subsequent and more detailed analyses. The specific objectives were to characterize the LNG facilities of interest and their release prevention and control systems, identify possible weak links and research needs, and provide an analytical framework for subsequent detailed analyses. The LNG facilities analyzed include a reference export terminal, marine vessel, import terminal, peakshaving facility, truck tanker, and satellite facility. A reference description for these facilities, a preliminary hazards analysis (PHA), and a list of representative release scenarios are included. The reference facility descriptions outline basic process flows, plant layouts, and safety features. The PHA identifies the important release prevention operations. Representative release scenarios provide a format for discussing potential initiating events, effects of the release prevention and control systems, information needs, and potential design changes. These scenarios range from relatively frequent but low consequence releases to unlikely but large releases and are the principal basis for the next stage of analysis.

  5. Preventing Illegitimate Teenage Pregnancy Through Systems Interaction

    Science.gov (United States)

    Jarvis, D. L.

    1971-01-01

    Social workers, Cooperating with doctors, nurses, hospital social workers and educators in other helping systems, conducted a demonstration project described here, aimed at preventing illegitimate teenage pregnancy. (Author)

  6. Preliminary tests of an electrokinetic barrier to prevent heavy metal pollution of soils

    International Nuclear Information System (INIS)

    Lynch, R.J.; Muntoni, A.; Ruggeri, R.; Winfield, K.C.

    2007-01-01

    Sardinia has to deal with significant environmental problems related to heavy-metal contamination, mainly located at its abandoned mining districts. In particular, acid mine drainage management and groundwater pollution are typical problems associated with mining activities which constitute a serious threat to human health. To prevent contaminant spread over the adjacent environment, it is of great interest to consider using an electric field as a containment fence to counteract pollutant transport. In this application, contaminant transport due to a hydraulic gradient driving force is prevented by the combined effect of electro-osmosis and electro-migration. Although there are other alternative containment technologies, the electrokinetic fence offers many advantages, as it is easy to operate, there is a minimal exposure to the operating personnel and it is likely to be effective for a wide range of contaminants. In this work, both one-dimensional (1D) and two-dimensional (2D) tests have been carried out. In the 1D tests, the efficiency of an electrokinetic barrier to prevent cadmium from polluting an uncontaminated sample was investigated; soil pH, metal concentration and current intensity have been monitored; results indicate that the barrier can prevent or significantly reduce heavy-metal contamination from spreading against a hydraulic gradient of 7. In 2D tests, two rows of electrodes inserted in a horizontally flat soil tank were used to generate an electric field. It was found that an electric field of 125 V m -1 was sufficient to prevent significant copper incursion from a contaminant flow under a hydraulic gradient of 1.3

  7. Multiloop Integral System Test (MIST): MIST Facility Functional Specification

    International Nuclear Information System (INIS)

    Habib, T.F.; Koksal, C.G.; Moskal, T.E.; Rush, G.C.; Gloudemans, J.R.

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock ampersand Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs

  8. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    Directory of Open Access Journals (Sweden)

    Paolo Renna

    2017-03-01

    Full Text Available Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performance measures are compared with a system without any flexibility and no preventive maintenance actions. Different levels of flexibility and preventive maintenance actions are examined under a simulation environment. The simulation results highlight more important factors for the performance measures and the best combination of the factors to improve the performance.

  9. Environmental evaluation of municipal waste prevention

    DEFF Research Database (Denmark)

    Gentil, Emmanuel; Gallo, Daniele; Christensen, Thomas Højlund

    2011-01-01

    society, using life-cycle thinking. The partial prevention of unsolicited mail, beverage packaging and food waste is tested for a “High-tech” waste management system relying on high energy and material recovery and for a “Low-tech” waste management system with less recycling and relying on landfilling......Waste prevention has been addressed in the literature in terms of the social and behavioural aspects, but very little quantitative assessment exists of the environmental benefits. Our study evaluates the environmental consequences of waste prevention on waste management systems and on the wider....... Prevention of 13% of the waste mass entering the waste management system generates a reduction of loads and savings in the waste management system for the different impacts categories; 45% net reduction for nutrient enrichment and 12% reduction for global warming potential. When expanding our system...

  10. Implementation of a guideline for pressure ulcer prevention in home care: pretest-post-test study.

    Science.gov (United States)

    Paquay, Louis; Verstraete, Sabine; Wouters, Renild; Buntinx, Frank; Vanderwee, Katrien; Defloor, Tom; Van Gansbeke, Hendrik

    2010-07-01

    To investigate the effect of the implementation of a patient and family education programme for pressure ulcer prevention in an organisation for home care nursing on guideline adherence and on prevalence and severity of pressure ulcers and to examine the determining factors for the application of measures for pressure ulcer prevention. Quality improvement programmes in pressure ulcer prevention are not always successful. Implementation study using a pretest-post-test design. Data were collected in three probability samples. The first post-test data collection was held after six months, the second after 18 months. Statistical analysis was used, comparing the pretest sample and the second post-test sample. After 18 months, the proportion of subjects with adherent measures had increased from 10·4-13·9%, the proportion of subjects with non-adherent measures decreased from 45·7-36·0%, the proportion of subjects without pressure ulcer prevention increased from 43·9-50·1% (ppressure ulcer prevalence and less severe skin lesions. The nurses' judgement of a patient risk status was the most important factor for applying preventive measures. Furthermore, application of pressure ulcer prevention was determined by higher age (from the age category of 70-79 years), higher dependency for the activities of daily living, higher than baseline mobility score and the presence of a pressure ulcer. Guideline adherence in pressure ulcer prevention changed significantly after implementation of the education programme. There might have been inconsistencies in the nurses' risk judgement. Quality of pressure ulcer prevention improved, but several items for improvement remain. Adaptation of risk assessment procedures is needed. © 2010 Blackwell Publishing Ltd.

  11. Environmental evaluation of municipal waste prevention

    International Nuclear Information System (INIS)

    Gentil, Emmanuel C.; Gallo, Daniele; Christensen, Thomas H.

    2011-01-01

    Highlights: → Influence of prevention on waste management systems, excluding avoided production, is relatively minor. → Influence of prevention on overall supply chain, including avoided production is very significant. → Higher relative benefits of prevention are observed in waste management systems relying mainly on landfills. - Abstract: Waste prevention has been addressed in the literature in terms of the social and behavioural aspects, but very little quantitative assessment exists of the environmental benefits. Our study evaluates the environmental consequences of waste prevention on waste management systems and on the wider society, using life-cycle thinking. The partial prevention of unsolicited mail, beverage packaging and food waste is tested for a 'High-tech' waste management system relying on high energy and material recovery and for a 'Low-tech' waste management system with less recycling and relying on landfilling. Prevention of 13% of the waste mass entering the waste management system generates a reduction of loads and savings in the waste management system for the different impacts categories; 45% net reduction for nutrient enrichment and 12% reduction for global warming potential. When expanding our system and including avoided production incurred by the prevention measures, large savings are observed (15-fold improvement for nutrient enrichment and 2-fold for global warming potential). Prevention of food waste has the highest environmental impact saving. Prevention generates relatively higher overall relative benefit for 'Low-tech' systems depending on landfilling. The paper provides clear evidence of the environmental benefits of waste prevention and has specific relevance in climate change mitigation.

  12. Preventive maintenance for computer systems - concepts & issues ...

    African Journals Online (AJOL)

    Performing preventive maintenance activities for the computer is not optional. The computer is a sensitive and delicate device that needs adequate time and attention to make it work properly. In this paper, the concept and issues on how to prolong the life span of the system, that is, the way to make the system last long and ...

  13. Teacher Narratives and Student Engagement: Testing Narrative Engagement Theory in Drug Prevention Education

    Science.gov (United States)

    Miller-Day, Michelle; Hecht, Michael L.; Krieger, Janice L.; Pettigrew, Jonathan; Shin, YoungJu; Graham, John

    2015-01-01

    Testing narrative engagement theory, this study examines student engagement and teachers’ spontaneous narratives told in a narrative-based drug prevention curriculum. The study describes the extent to which teachers share their own narratives in a narrative-based curriculum, identifies dominant narrative elements, forms and functions, and assesses the relationships among teacher narratives, overall lesson narrative quality, and student engagement. One hundred videotaped lessons of the keepin’ it REAL drug prevention curriculum were coded and the results supported the claim that increased narrative quality of a prevention lesson would be associated with increased student engagement. The quality of narrativity, however, varied widely. Implications of these results for narrative-based prevention interventions and narrative pedagogy are discussed. PMID:26690668

  14. SAPE Database Building for a Security System Test Bed

    International Nuclear Information System (INIS)

    Jo, Kwangho; Kim, Woojin

    2013-01-01

    Physical protection to prevent radiological sabotage and the unauthorized removal of nuclear material is one of the important activities. Physical protection system (PPS) of nuclear facilities needs the effectiveness analysis. This effectiveness analysis of PPS is evaluated by the probability of blocking the attack at the most vulnerable path. Systematic Analysis of Physical Protection Effectiveness (SAPE) is one of a computer code developed for the vulnerable path analysis. SAPE is able to analyze based on the data of the experimental results that can be obtained through the Test Bed. In order to utilize the SAPE code, we conducted some field tests on several sensors and acquired data. This paper aims at describing the way of DB (database) establishment

  15. Test report - caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1995-01-01

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ''Caustic Addition System Operability Test Procedure''. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  16. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  17. Illicit drugs, testing, prevention and work in France: ethical and legal issues.

    Science.gov (United States)

    Fantoni-Quinton, Sophie; Bossu, Bernard; Morgenroth, Thomas; Frimat, Paul

    2010-09-01

    The use of illicit drugs in the workplace raises issues pertaining to prevention and safety and the responsibility of the various members of staff. It also brings into question the interface between work and private life. If employees are in theory responsible for their own safety and risk heavy penalties in the event of the consumption of illicit drugs in the workplace, such behaviour has to be proved. In reality, the worker can only be partially and marginally held liable, given the fact that the employer is prohibited from infringing on their rights and liberties (restrictions on the searching of their personal belongings and lockers as well as on the carrying out of breath testing and saliva testing under restrictive conditions). Employers have for their part a broader range of responsibilities and, above all, an absolute obligation to achieve specific goals in terms of health and safety resulting in the need to take action. In accordance with the International Labour Organization recommendations, European and national legislation, the employer has to implement a suitable preventive policy. However, where is the balance between prevention and repression? Very few studies have raised these issues and our aim is to precisely situate the place of drug testing in the employer's repressive arsenal in France and to try to answer the legal and ethical issues raised. Thus, for example, repression can only be acceptable when it deals with moderate and non-addicted users, or it could be tantamount to discrimination.

  18. Science from evaluation: testing hypotheses about differential effects of three youth-focused suicide prevention trainings.

    Science.gov (United States)

    Coleman, Daniel; Del Quest, Aisling

    2015-01-01

    As part of an evaluation component of a youth suicide prevention, a quasi-experimental repeated measures design tested hypotheses about two brief suicide prevention gatekeeper trainings (Question, Persuade, Refer [QPR] and RESPONSE) and one longer suicide intervention skills training (Applied Suicide Intervention Skills Training [ASIST]). All three trainings showed large changes in prevention attitudes and self-efficacy, largely maintained at follow-up. ASIST trainees had large increases in asking at-risk youth about suicide at follow-up. Convergent with other research, modeling and role-play in training are crucial to increased prevention behaviors. Practice and research implications are discussed, including social work roles in suicide prevention and research.

  19. Corruption Early Prevention: Decision Support System for President of the Republic of Indonesia

    Science.gov (United States)

    Sasmoko; Widhoyoko, S. A.; Ariyanto, S.; Indrianti, Y.; Noerlina; Muqsith, A. M.; Alamsyah, M.

    2017-01-01

    Corruption is an extraordinary crime, and then the prevention must also be extraordinary, simultaneously (national) in the form of early warning that involves all elements; government, industry, and society. To realize it the system needs to be built which in this study is called the Corruption Early Prevention (CEP) as a Decision Support System for President of the Republic of Indonesia. This study aims to examine 1) how is the construct of the Corruption Early Prevention as a Decision Support System for President of the Republic of Indonesia?, and 2) how is the design form of the system of Corruption Early Prevention as a Decision Support System for President of Republic of Indonesia? The research method is using Neuro-Research which is the collaboration of qualitative and quantitative research methods and the model development of Information Technology (IT). The research found that: 1) the construct of CEP is theoretically feasible, valid and reliable by content to be developed in the context of the prevention of corruption in Indonesia as an early prevention system that diagnoses Indonesia simultaneously and in real time, and 2) the concept of system design and business process of CEP is predicted to be realized in the IT-based program.

  20. A Meta-Analysis of Empirically Tested School-Based Dating Violence Prevention Programs

    Directory of Open Access Journals (Sweden)

    Sarah R. Edwards

    2014-05-01

    Full Text Available Teen dating violence prevention programs implemented in schools and empirically tested were subjected to meta-analysis. Eight studies met criteria for inclusion, consisting of both within and between designs. Overall, the weighted mean effect size (ES across studies was significant, ESr = .11; 95% confidence interval (CI = [.08, .15], p < .0001, showing an overall positive effect of the studied prevention programs. However, 25% of the studies showed an effect in the negative direction, meaning students appeared to be more supportive of dating violence after participating in a dating violence prevention program. This heightens the need for thorough program evaluation as well as the need for decision makers to have access to data about the effectiveness of programs they are considering implementing. Further implications of the results and recommendations for future research are discussed.

  1. PageFocus: Using paradata to detect and prevent cheating on online achievement tests.

    Science.gov (United States)

    Diedenhofen, Birk; Musch, Jochen

    2017-08-01

    Cheating threatens the validity of unproctored online achievement tests. To address this problem, we developed PageFocus, a JavaScript that detects when participants abandon test pages by switching to another window or browser tab. In a first study, we aimed at testing whether PageFocus could detect and prevent cheating. We asked 115 lab and 186 online participants to complete a knowledge test comprising items that were difficult to answer but easy to look up on the Internet. Half of the participants were invited to look up the solutions, which significantly increased their test scores. The PageFocus script detected test takers who abandoned the test page with very high sensitivity and specificity, and successfully reduced cheating by generating a popup message that asked participants not to cheat. In a second study, 510 online participants completed a knowledge test comprising items that could easily be looked up and a reasoning task involving matrices that were impossible to look up. In a first group, a performance-related monetary reward was promised to the top scorers; in a second group, participants took part in a lottery that provided performance-unrelated rewards; and in a third group, no incentive was offered. PageFocus revealed that participants cheated more when performance-related incentives were offered. As expected, however, this effect was limited to items that could easily be looked up. We recommend that PageFocus be routinely employed to detect and prevent cheating on online achievement tests.

  2. Multiloop integral system test (MIST): Final report, Inter-group comparisons

    Energy Technology Data Exchange (ETDEWEB)

    Gloudemans, J.R.

    1989-07-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock and Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to address the thermal-hydraulic SBLOCA questions. MIST and two other supporting facilities were specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and the other facilities will be used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The individual tests are described in detail in Volumes 2 through 8 and Volume 11, and are summarized in Volume 1. Inter-group comparisons are addressed in this document, Volume 9. These comparisons are grouped as follows: mapping versus SBLOCA transients, SBLOCA, pump effects, and the effects of noncondensible gases. Appendix A provides an index and description of the microfiched plots for each test, which are enclosed with the corresponding Volumes 2 through 8. 147 figs., 5 tabs.

  3. Error response test system and method using test mask variable

    Science.gov (United States)

    Gender, Thomas K. (Inventor)

    2006-01-01

    An error response test system and method with increased functionality and improved performance is provided. The error response test system provides the ability to inject errors into the application under test to test the error response of the application under test in an automated and efficient manner. The error response system injects errors into the application through a test mask variable. The test mask variable is added to the application under test. During normal operation, the test mask variable is set to allow the application under test to operate normally. During testing, the error response test system can change the test mask variable to introduce an error into the application under test. The error response system can then monitor the application under test to determine whether the application has the correct response to the error.

  4. Warfarin for the prevention of systemic embolism in patients with non-valvular atrial fibrillation

    DEFF Research Database (Denmark)

    Andersen, L V; Vestergaard, P; Deichgraeber, P

    2008-01-01

    Warfarin for stroke prevention in patients with atrial fibrillation (AF) is well documented. However, it has not been examined in the prevention of systemic embolism.......Warfarin for stroke prevention in patients with atrial fibrillation (AF) is well documented. However, it has not been examined in the prevention of systemic embolism....

  5. Preventing Elder Abuse: The Texas Plan for a Coordinated Service Delivery System. Collaborative Elder Abuse Prevention Project.

    Science.gov (United States)

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide Collaborative Elder Abuse Prevention project. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for achieving a coordinated service delivery system for…

  6. Cost-effectiveness analysis of a system-based approach for managing neonatal jaundice and preventing kernicterus in Ontario

    Science.gov (United States)

    Xie, Bin; da Silva, Orlando; Zaric, Greg

    2012-01-01

    OBJECTIVE: To evaluate the incremental cost-effectiveness of a system-based approach for the management of neonatal jaundice and the prevention of kernicterus in term and late-preterm (≥35 weeks) infants, compared with the traditional practice based on visual inspection and selected bilirubin testing. STUDY DESIGN: Two hypothetical cohorts of 150,000 term and late-preterm neonates were used to compare the costs and outcomes associated with the use of a system-based or traditional practice approach. Data for the evaluation were obtained from the case costing centre at a large teaching hospital in Ontario, supplemented by data from the literature. RESULTS: The per child cost for the system-based approach cohort was $176, compared with $173 in the traditional practice cohort. The higher cost associated with the system-based cohort reflects increased costs for predischarge screening and treatment and increased postdischarge follow-up visits. These costs are partially offset by reduced costs from fewer emergency room visits, hospital readmissions and kernicterus cases. Compared with the traditional approach, the cost to prevent one kernicterus case using the system-based approach was $570,496, the cost per life year gained was $26,279, and the cost per quality-adjusted life year gained was $65,698. CONCLUSION: The cost to prevent one kernicterus case using the system-based approach is much lower than previously reported in the literature. PMID:23277747

  7. Cost-effectiveness analysis of a system-based approach for managing neonatal jaundice and preventing kernicterus in Ontario.

    Science.gov (United States)

    Xie, Bin; da Silva, Orlando; Zaric, Greg

    2012-01-01

    To evaluate the incremental cost-effectiveness of a system-based approach for the management of neonatal jaundice and the prevention of kernicterus in term and late-preterm (≥35 weeks) infants, compared with the traditional practice based on visual inspection and selected bilirubin testing. Two hypothetical cohorts of 150,000 term and late-preterm neonates were used to compare the costs and outcomes associated with the use of a system-based or traditional practice approach. Data for the evaluation were obtained from the case costing centre at a large teaching hospital in Ontario, supplemented by data from the literature. The per child cost for the system-based approach cohort was $176, compared with $173 in the traditional practice cohort. The higher cost associated with the system-based cohort reflects increased costs for predischarge screening and treatment and increased postdischarge follow-up visits. These costs are partially offset by reduced costs from fewer emergency room visits, hospital readmissions and kernicterus cases. Compared with the traditional approach, the cost to prevent one kernicterus case using the system-based approach was $570,496, the cost per life year gained was $26,279, and the cost per quality-adjusted life year gained was $65,698. The cost to prevent one kernicterus case using the system-based approach is much lower than previously reported in the literature.

  8. [Project summarize of "reestablishing disease prevention and control system of China"].

    Science.gov (United States)

    Hao, Mo; Yu, Jingjin; Yu, Mingzhu; Duan, Yong

    2005-01-01

    This paper introduced the project of "reestablishing the disease control and prevention system of China" in brief, including background, objectives, funding resources, researching objects and sampling methods. This project which funded by National Outstanding Younger Fund and the research fund of MOH aimed at nailing down the key problem existed in disease control and prevention system of China, demonstrating the reasons and mechanism of key problem, developing feasible policy idea and strategy. This paper also introduced some issues concerning the reestablishing of the disease control and prevention system of China: the definition of public function, the standard of human resource allocation and the standard of financing. The Centers for Disease Control and Prevention in 8 provinces, 80 cities and 80 counties have been sampled to provide information that project needed. In addition, this project also cited some data which come from the early study, in which 3 provinces, 12 counties, 49 towns, 179 villages and 9781 rural families have been sampled and investigated.

  9. System 80+TM PRA insights on severe accident prevention and mitigation

    International Nuclear Information System (INIS)

    Finnicum, D.J.; Jacob, M.C.; Schneider, R.E.; Weston, R.A.

    2004-01-01

    The System 80 + design is ABB-CE's standardized evolutionary Advanced Light Water Reactor (ALWR) design. It incorporates design enhancements based on Probabilistic Risk Assessment (PRA) insights, guidance from the ALWR Utility Requirements Document (URD), and US NRC's Severe Accident Policy. Major severe accident prevention and mitigation design features of the System 80 + design are described. The results of the System 80 + PRA are presented and the insights gained from the PRA sensitivity analyses are discussed. ABB-CE considered defense-in-depth for accident prevention and mitigation early in the design process and used robust design features to ensure that the System 80 + design achieved a low core damage frequency, low containment conditional failure probability, and excellent deterministic containment performance under severe accident conditions and to ensure that the risk was properly allocated among design features and between prevention and mitigation. (author)

  10. Process Control for Precipitation Prevention in Space Water Recovery Systems

    Science.gov (United States)

    Sargusingh, Miriam; Callahan, Michael R.; Muirhead, Dean

    2015-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, rotary distillation systems have been actively pursued by NASA as one of the technologies for water recovery from wastewater primarily comprised of human urine. A specific area of interest is the prevention of the formation of solids that could clog fluid lines and damage rotating equipment. To mitigate the formation of solids, operational constraints are in place that limits such that the concentration of key precipitating ions in the wastewater brine are below the theoretical threshold. This control in effected by limiting the amount of water recovered such that the risk of reaching the precipitation threshold is within acceptable limits. The water recovery limit is based on an empirically derived worst case wastewater composition. During the batch process, water recovery is estimated by monitoring the throughput of the system. NASA Johnson Space Center is working on means of enhancing the process controls to increase water recovery. Options include more precise prediction of the precipitation threshold. To this end, JSC is developing a means of more accurately measuring the constituent of the brine and/or wastewater. Another means would be to more accurately monitor the throughput of the system. In spring of 2015, testing will be performed to test strategies for optimizing water recovery without increasing the risk of solids formation in the brine.

  11. American Association for the Surgery of Trauma Prevention Committee topical overview: National Trauma Data Bank, geographic information systems, and teaching injury prevention.

    Science.gov (United States)

    Crandall, Marie; Zarzaur, Ben; Tinkoff, Glen

    2013-11-01

    Injury is the leading cause of death for all Americans aged 1 to 35 years, and injury-related costs exceed $100 billion per year in the United States. Trauma centers can be important resources for risk identification and prevention strategies. The authors review 3 important resources for injury prevention education and research: the National Trauma Data Bank, geographic information systems, and an overview of injury prevention education. The National Trauma Data Bank and the Trauma Quality Improvement Program are available through the Web site of the American College of Surgeons. Links to research examples using geographic information systems software and the National Trauma Data Bank are provided in the text. Finally, resources for surgical educators in the area of injury prevention are summarized and examples provided. Database research, geographic information systems, and injury prevention education are important tools in the field of injury prevention. This article provides an overview of current research and education strategies and resources. Copyright © 2013 Elsevier Inc. All rights reserved.

  12. Data Link Test and Analysis System/ATCRBS Transponder Test System Technical Reference

    Science.gov (United States)

    1990-05-01

    This document references material for personnel using or making software changes : to the Data Link Test and Analysis System (DATAS) for Air Traffic Control Radar : Beacon System (ATCRBS) transponder testing and data collection. This is one of : a se...

  13. Whole of Systems Trial of Prevention Strategies for Childhood Obesity: WHO STOPS Childhood Obesity

    Directory of Open Access Journals (Sweden)

    Steven Allender

    2016-11-01

    Full Text Available Background: Community-based initiatives show promise for preventing childhood obesity. They are characterized by community leaders and members working together to address complex local drivers of energy balance. Objectives: To present a protocol for a stepped wedge cluster randomized trial in ten communities in the Great South Coast Region of Victoria, Australia to test whether it is possible to: (1 strengthen community action for childhood obesity prevention, and (2 measure the impact of increased action on risk factors for childhood obesity. Methods: The WHO STOPS intervention involves a facilitated community engagement process that: creates an agreed systems map of childhood obesity causes for a community; identifies intervention opportunities through leveraging the dynamic aspects of the system; and, converts these understandings into community-built, systems-oriented action plans. Ten communities will be randomized (1:1 to intervention or control in year one and all communities will be included by year three. The primary outcome is childhood obesity prevalence among grade two (ages 7–8 y, grade four (9–10 y and grade six (11–12 y students measured using our established community-led monitoring system (69% school and 93% student participation rate in government and independent schools. An additional group of 13 external communities from other regions of Victoria with no specific interventions will provide an external comparison. These communities will also allow us to assess diffusion of the intervention to control communities during the first three years of the trial. Conclusion: This trial will test effectiveness, over a five-year period, of community-owned, -supported and -led strategies designed to address complex and dynamic causes of childhood obesity.

  14. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  15. Radiation Detection System for Prevention of Radiological and Nuclear Terrorism

    International Nuclear Information System (INIS)

    Kwak, Sung-Woo; Yoo, Ho-Sik; Jang, Sung-Sun; Kim, Jae-Kwang; Kim, Jung-Soo

    2007-01-01

    After the September 11 terrorist attack, the threat of a potential for a radiological or nuclear terrorist attack became more apparent. The threats relating to radiological or nuclear materials include a Radiological Dispersion Device (RDD), an Improved Nuclear Device (IND) or a State Nuclear Device (such as a Soviet manufactured suitcase nuclear weapon). For more effective countermeasures against the disaster, multilayer protection concept - prevention of smuggling of radioactive or nuclear material into our country through seaports or airports, detection and prevention of the threat materials in transit on a road, and prevention of their entry into a target building - is recommended. Due to different surrounding circumstances of where detection system is deployed, different types of radiation detection systems are required. There have been no studies on characteristics of detection equipment required under Korean specific conditions. This paper provides information on technical requirements of radiation detection system to achieve multi-layer countermeasures for the purpose of protecting the public and environment against radiological and nuclear terrorism

  16. 30 CFR 250.516 - Blowout preventer system tests, inspections, and maintenance.

    Science.gov (United States)

    2010-07-01

    ... seal in the wellhead or BOP stack assembly; (e) Postponing BOP tests. You may postpone a BOP test if... sea conditions permit. You may use television cameras to inspect this equipment. The District Manager...

  17. Development of control technology for HTTR hydrogen production system with mock-up test facility

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo; Takeda, Tetsuaki; Hayashi, Koji; Takada, Shoji; Inagaki, Yoshiyuki

    2006-01-01

    The Japan Atomic Energy Agency has been planning the demonstration test of hydrogen production with the High Temperature Engineering Test Reactor (HTTR). In a HTTR hydrogen production system (HTTR-H2), it is required to control a primary helium temperature within an allowable value at a reactor inlet to prevent a reactor scram. A cooling system for a secondary helium with a steam generator (SG) and a radiator is installed at the downstream of a chemical rector in a secondary helium loop in order to mitigate the thermal disturbance caused by the hydrogen production system. Prior to HTTR-H2, the simulation test with a mock-up test facility has been carried out to establish the controllability on the helium temperature using the cooling system against the loss of chemical reaction. It was confirmed that the fluctuations of the helium temperature at chemical reactor outlet, more than 200 K, at the loss of chemical reaction could be successfully mitigated within the target of ±10 K at SG outlet. A dynamic simulation code of the cooling system for HTTR-H2 was verified with the obtained test data

  18. Portable Health Algorithms Test System

    Science.gov (United States)

    Melcher, Kevin J.; Wong, Edmond; Fulton, Christopher E.; Sowers, Thomas S.; Maul, William A.

    2010-01-01

    A document discusses the Portable Health Algorithms Test (PHALT) System, which has been designed as a means for evolving the maturity and credibility of algorithms developed to assess the health of aerospace systems. Comprising an integrated hardware-software environment, the PHALT system allows systems health management algorithms to be developed in a graphical programming environment, to be tested and refined using system simulation or test data playback, and to be evaluated in a real-time hardware-in-the-loop mode with a live test article. The integrated hardware and software development environment provides a seamless transition from algorithm development to real-time implementation. The portability of the hardware makes it quick and easy to transport between test facilities. This hard ware/software architecture is flexible enough to support a variety of diagnostic applications and test hardware, and the GUI-based rapid prototyping capability is sufficient to support development execution, and testing of custom diagnostic algorithms. The PHALT operating system supports execution of diagnostic algorithms under real-time constraints. PHALT can perform real-time capture and playback of test rig data with the ability to augment/ modify the data stream (e.g. inject simulated faults). It performs algorithm testing using a variety of data input sources, including real-time data acquisition, test data playback, and system simulations, and also provides system feedback to evaluate closed-loop diagnostic response and mitigation control.

  19. Shilling Attack Prevention for Recommender Systems Using Social-based Clustering

    KAUST Repository

    Lee, Tak

    2011-06-06

    A Recommender System (RS) is a system that utilizes user and item information to predict the feeling of users towards unfamiliar items. Recommender Systems have become popular tools for online stores due to their usefulness in confidently recommending items to users. A popular algorithm for recommender system is Collaborative Filtering (CF). CF uses other users\\' profiles to predict whether a user is interested in a particular object. This system, however, is vulnerable to malicious users seeking to promote items by manipulating rating predictions with fake user profiles. Profiles with behaviors similar to "victim" users alter the prediction of a Recommender System. Manipulating rating predictions through injected profiles is referred to as a shilling attack. It is important to develop shilling attack prevention frameworks for to protect the trustworthiness of Recommender Systems. In this thesis, we will demonstrate a new methodology that utilizes social information to prevent malicious users from manipulating the prediction system. The key element in our new methodology rests upon the concept of trust among real users, an element we claim absent among malicious profiles. In order to use trust information for shilling attack prevention, we first develop a weighting system which makes the system rely more on trustworthy users when making predictions. We then use this trust information to cluster out untrustworthy users to improve rating robustness. The robustness of the new and classic systems is then evaluated with data from a public commercial consumer RS, Epinions.com. Several complexity reduction procedures are also introduced to make implementing the algorithms mentioned possible for a huge commercial database.

  20. Flexibility configurations and preventive maintenance impact on job-shop manufacturing systems

    OpenAIRE

    Paolo Renna

    2017-01-01

    Manufacturing systems need to be able to work under the dynamic and uncertain production environment. Machine and routing flexibility combined with preventive maintenance actions can improve the performance of the manufacturing systems under dynamic conditions. This paper evaluates different levels of machine and routing flexibility combined with different degrees of preventive maintenance policy. The performance measures considered are throughput, work in process and throughput. The performa...

  1. Genetic Testing for Type 2 Diabetes in High-Risk Children: the Case for Primordial Prevention

    Directory of Open Access Journals (Sweden)

    Jennifer Wessel

    2017-09-01

    Full Text Available Extensive research now demonstrates that lifestyle modification can significantly lower risk of developing type 2 diabetes (T2D in high-risk adults. In children, the evidence for lifestyle modification is not as robust, but the rapidly rising rate of obesity in children coupled with the substantial difficulty in changing behaviors later in life illuminates the need to implement prevention efforts early in the life course of children. Genetic data can now be used early in the life course to identify children at high-risk of developing T2D before traditional clinical measures can detect the presence of prediabetes; a metabolic condition associated with obesity that significantly increases risk for developing T2D.  Such early detection of risk may enable the promotion of “primordial prevention” in which parents implement behavior change for their at risk children.  Young children with genetic risk are a novel target population.  Here we review the literature on genetic testing for prevention as it relates to chronic diseases and specifically use T2D as a model. We discuss the history of primordial prevention, the need for primordial prevention of T2D and the role genetic testing has in primordial prevention of high-risk families.

  2. Optimized preventive replacement policy for large cascade systems

    International Nuclear Information System (INIS)

    Kretzen, H.H.

    1986-01-01

    The repair-bottleneck problem as a limiting factor for system reliability can be overcome. Design need only cover the steady state, wearout induced accumulations of failures being precluded by preventive replacements with subsequent recycling. As a result, a reliable system appears to be feasible on an economic basis, optimization in detail to be left to more precised cost-benefit studies. As a reference system the radio-frequency-generator cascade of a single-cell linear accelerator is considered. (DG)

  3. Preventing DoS attacks in peer-to-peer media streaming systems

    Science.gov (United States)

    Conner, William; Nahrstedt, Klara; Gupta, Indranil

    2006-01-01

    This paper presents a framework for preventing both selfishness and denial-of-service attacks in peer-to-peer media streaming systems. Our framework, called Oversight, achieves prevention of these undesirable activities by running a separate peer-to-peer download rate enforcement protocol along with the underlying peer-to-peer media streaming protocol. This separate Oversight protocol enforces download rate limitations on each participating peer. These limitations prevent selfish or malicious nodes from downloading an overwhelming amount of media stream data that could potentially exhaust the entire system. Since Oversight is based on a peer-to-peer architecture, it can accomplish this enforcement functionality in a scalable, efficient, and decentralized way that fits better with peer-to-peer media streaming systems compared to other solutions based on central server architectures. As peer-to-peer media streaming systems continue to grow in popularity, the threat of selfish and malicious peers participating in such large peer-to-peer networks will continue to grow as well. For example, since peer-to-peer media streaming systems allow users to send small request messages that result in the streaming of large media objects, these systems provide an opportunity for malicious users to exhaust resources in the system with little effort expended on their part. However, Oversight addresses these threats associated with selfish or malicious peers who cause such disruptions with excessive download requests. We evaluated our Oversight solution through simulations and our results show that applying Oversight to peer-to-peer media streaming systems can prevent both selfishness and denial-of-service attacks by effectively limiting the download rates of all nodes in the system.

  4. Principal scheme of preventive maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Nishiyama, Takuya; Terano, Takao; Yokoo, Takeshi; Shinohara, Yasushi

    1985-01-01

    It is of great importance to turn lessons learned from abnormal event experiences to advantage as well as taking apriori actions for prevention of abnormal events in nuclear power plants. From this point of view, a consultation system, named as Preventive Maintenance Support System (PMSS), which is to possess accumulated knowledges drawn from the past abnormal events in nuclear power plants infer occurrences, factors and developments of abnormal events and recommend preventive countermeasures on the basis of the knowledges, has been proposed. This report presents the principal scheme of PMSS. To begin with, following to the discussion of the purpose and use of PMSS, the fundamental functions PMSS should perform are specified. They are (1) event factors analyzation, (2) event prediction (event development estimation and analogous event estimation), (3) event significance evaluation and (4) preventive countermeasures presentation. In the next place, it is asserted that such a system should be constructed as a knowledge engineering one. Then, the R and D subjects and related schedule for PMSS are set up. (author)

  5. Testing Mediators of Intervention Effects in Randomized Controlled Trials: An Evaluation of Three Depression Prevention Programs

    Science.gov (United States)

    Stice, Eric; Rohde, Paul; Seeley, John R.; Gau, Jeff M.

    2010-01-01

    Objective: Evaluate a new 5-step method for testing mediators hypothesized to account for the effects of depression prevention programs. Method: In this indicated prevention trial, at-risk teens with elevated depressive symptoms were randomized to a group cognitive-behavioral (CB) intervention, group supportive expressive intervention, CB…

  6. How home HIV testing and counselling with follow-up support achieves high testing coverage and linkage to treatment and prevention: a qualitative analysis from Uganda.

    Science.gov (United States)

    Ware, Norma C; Wyatt, Monique A; Asiimwe, Stephen; Turyamureeba, Bosco; Tumwesigye, Elioda; van Rooyen, Heidi; Barnabas, Ruanne V; Celum, Connie L

    2016-01-01

    The successes of HIV treatment scale-up and the availability of new prevention tools have raised hopes that the epidemic can finally be controlled and ended. Reduction in HIV incidence and control of the epidemic requires high testing rates at population levels, followed by linkage to treatment or prevention. As effective linkage strategies are identified, it becomes important to understand how these strategies work. We use qualitative data from The Linkages Study, a recent community intervention trial of community-based testing with linkage interventions in sub-Saharan Africa, to show how lay counsellor home HIV testing and counselling (home HTC) with follow-up support leads to linkage to clinic-based HIV treatment and medical male circumcision services. We conducted 99 semi-structured individual interviews with study participants and three focus groups with 16 lay counsellors in Kabwohe, Sheema District, Uganda. The participant sample included both HIV+ men and women (N=47) and HIV-uncircumcised men (N=52). Interview and focus group audio-recordings were translated and transcribed. Each transcript was summarized. The summaries were analyzed inductively to identify emergent themes. Thematic concepts were grouped to develop general constructs and framing propositional statements. Trial participants expressed interest in linking to clinic-based services at testing, but faced obstacles that eroded their initial enthusiasm. Follow-up support by lay counsellors intervened to restore interest and inspire action. Together, home HTC and follow-up support improved morale, created a desire to reciprocate, and provided reassurance that services were trustworthy. In different ways, these functions built links to the health service system. They worked to strengthen individuals' general sense of capability, while making the idea of accessing services more manageable and familiar, thus reducing linkage barriers. Home HTC with follow-up support leads to linkage by building

  7. Radiation Detection System for Prevention of Illicit Trafficking of Nuclear and Radioactive Materials

    International Nuclear Information System (INIS)

    Kwak, Sung Woo; Chang, Sung Soon; Yoo, Ho Sik

    2010-01-01

    Fixed radiation portal monitors (RPMs) deployed at border, seaport, airport and key traffic checkpoints have played an important role in preventing the illicit trafficking and transport of nuclear and radioactive materials. However, the RPM is usually large and heavy and can't easily be moved to different locations. These reasons motivate us to develop a mobile radiation detection system. The objective of this paper is to report our experience on developing the mobile radiation detection system for search and detection of nuclear and radioactive materials during road transport. Field tests to characterize the developed detection system were performed at various speeds and distances between the radioactive isotope (RI) transporting car and the measurement car. Results of measurements and detection limits of our system are described in this paper. The mobile radiation detection system developed should contribute to defending public's health and safety and the environment against nuclear and radiological terrorism by detecting nuclear or radioactive material hidden illegally in a vehicle

  8. On line test of trip channels and actuators in primary shutdown system for RAPP-3,4/KAIGA-1,2 reactors

    International Nuclear Information System (INIS)

    Pramanik, M.; Gupta, P.K.; Ravi Prakash

    1997-01-01

    Several types of system design and logic arrangements have been used for reactor shutdown systems to avoid the possibility that a single failure within the trip channels/shutdown system actuators can prevent a shutdown system actuation. The trip channels and the logic arrangements associated with the shutdown systems use redundancy to allow them to continue to operate successfully even after having a certain number of failures. A periodic test is thus needed to detect and repair/replace failed elements to prevent accumulation and eventual system failure. The test must be capable of detecting the first failure. The design initiates shutdown system actuation by deenergising the logic relays and turning off the power to the final electrical actuators. Thus, the systems are fail safe with respect to loss of electrical power to the instruments, logic channels and the actuators. Several system/logic arrangements are used to reduce the chances of spurious actuation caused by the loss of a single power supply and other single failures. In general, the systems use coincidence of instrument channel trips and have separate power supplies for the individual instrument channel and dual power supplies where a single final control element is used. These features also permit on line test of instrument channels and logic train. On line test detects component failures not found by other means. The test determines whether gross failure has occurred rather than perform a calibration. As far as practicable the whole channel from sensors to logic and final control element is to be tested. (author)

  9. Development of Testing Platform for Digital I and C System in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, G. Y.; Kim, Y. M.; Jeong, C. H. [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-10-15

    According to digitalization of the NPP (Nuclear Power Plant) I and C (Instrumentation and Control) system, cyber threats against I and C system are increased. Moreover, the complexity of I and C system are increased due to adopt the up-to-date technologies (i. e., smart sensor, wireless network, and Field Programmable Gate Array / Complex Programmable Logic Device) into NPP's I and C system. For example, new issues such as cyber threat are introduced from digitalized I and C systems and components to replace obsolete analog equipment in existing NPPs. Furthermore, use of wireless communication, FPGA/CPLD, and smart sensor could introduce new considerations such as Defense-in-Depth and Diversity. Therefore, the proof testing for digital I and C system is required to verify the adverse effect from use of up-to-date digital technologies and identify the criteria to resolve and mitigate (or prevent) the (possibility of) effects. The objective of this study is developing the Testing Platform for the proof testing. The digital I and C System Test Platform is implemented using test platform hardware, component software, and architectural design. The digital I and C testing platform includes the safety-related PLC and relevant ladder logics, Windows-based C++ codes for host PC. For software, there are seven spike models to confirm the each module's functionality and generate/monitor the signals to/from PLCs. For future work, digital I and C System Test Platform architecture will be implemented using spike models. And a set of acceptance test against cyber security, smart sensor, wireless network, and FPGA/CPLD will be conducted using digital I and C System Test Platform.

  10. Development of Testing Platform for Digital I and C System in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Park, G. Y.; Kim, Y. M.; Jeong, C. H.

    2013-01-01

    According to digitalization of the NPP (Nuclear Power Plant) I and C (Instrumentation and Control) system, cyber threats against I and C system are increased. Moreover, the complexity of I and C system are increased due to adopt the up-to-date technologies (i. e., smart sensor, wireless network, and Field Programmable Gate Array / Complex Programmable Logic Device) into NPP's I and C system. For example, new issues such as cyber threat are introduced from digitalized I and C systems and components to replace obsolete analog equipment in existing NPPs. Furthermore, use of wireless communication, FPGA/CPLD, and smart sensor could introduce new considerations such as Defense-in-Depth and Diversity. Therefore, the proof testing for digital I and C system is required to verify the adverse effect from use of up-to-date digital technologies and identify the criteria to resolve and mitigate (or prevent) the (possibility of) effects. The objective of this study is developing the Testing Platform for the proof testing. The digital I and C System Test Platform is implemented using test platform hardware, component software, and architectural design. The digital I and C testing platform includes the safety-related PLC and relevant ladder logics, Windows-based C++ codes for host PC. For software, there are seven spike models to confirm the each module's functionality and generate/monitor the signals to/from PLCs. For future work, digital I and C System Test Platform architecture will be implemented using spike models. And a set of acceptance test against cyber security, smart sensor, wireless network, and FPGA/CPLD will be conducted using digital I and C System Test Platform

  11. Selected isokinetic tests in knee injury prevention

    Directory of Open Access Journals (Sweden)

    W Pilis

    2010-03-01

    Full Text Available Ensuing from isokinetic measurements, the conventional Hcon/Qcon ratio of muscle balance is used as an index for comparing proper relations between the values of strength of knee flexors and extensor muscle. Its abnormal values might indicate pathology of the musculotendinous complex. The aim of the study was to present the possibility of using this ratio as one of the objective identifiers enabling the assessment of knee injury risk in sports. All participants (n=48 were divided into 3 groups: group A (n=16, healthy competitors, group B (n=16, athletes with minor injuries, group C (n=16, competitors with serious injuries, depending on the degree of knee injury. All subjects performed an isokinetic test for knee extensors and flexors at angular velocities of 60°/s and 120°/s. Average peak torque (APT value of knee flexors and extensors, and the value of Hcon/Qcon ratio was analyzed. Both values were calculated in relation to body mass (Nm/kg. Bilateral comparison of isokinetic test parameters confirmed the decrease of quadriceps muscle strength values for the injured extremity in groups B and C. Statistically significant difference was noted for Hcon/Qcon ratio between group A and C, as well as B and C. Hence, the value of conventional Hcon/Qcon ratio can be used for the prevention of sports related injuries.

  12. Maintenance of systemic immune functions prevents accelerated presbycusis.

    Science.gov (United States)

    Iwai, Hiroshi; Baba, Susumu; Omae, Mariko; Lee, Shinryu; Yamashita, Toshio; Ikehara, Susumu

    2008-05-07

    There is no effective therapy for progressive hearing loss such as presbycusis, the causes of which remain poorly understood because of the difficulty of separating genetic and environmental contributions. In the present study, we show that the age-related dysfunctions of the systemic immune system in an animal model of accelerated presbycusis (SAMP1, senescence-accelerated mouse P1) can be corrected by allogeneic bone marrow transplantation (BMT). We also demonstrate that this presbycusis can be prevented; BMT protects the recipients from age-related hearing impairment and the degeneration of spiral ganglion cells (SGCs) as well as the dysfunctions of T lymphocytes, which have a close relation to immune senescence. No donor cells are infiltrated to the spiral ganglia, confirming that this experimental system using BMT is connected to the systemic immune system and does not contribute to transdifferentiation or fusion by donor hematopoietic stem cells (HSCs), or to the direct maintenance of ganglion cells by locally infiltrated donor immunocompetent cells. Therefore, another procedure which attempts to prevent the age-related dysfunctions of the recipient immune system is the inoculation of syngeneic splenocytes from young donors. These mice show no development of hearing loss, compared with the recipient mice with inoculation of saline or splenocytes from old donors. Our studies on the relationship between age-related systemic immune dysfunctions and neurodegeneration mechanisms open up new avenues of treatment for presbycusis, for which there is no effective therapy.

  13. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  14. Preventive maintenance optimization for a multi-component system under changing job shop schedule

    International Nuclear Information System (INIS)

    Zhou Xiaojun; Lu Zhiqiang; Xi Lifeng

    2012-01-01

    Variability and small lot size is a common feature for many discrete manufacturing processes designed to meet a wide array of customer needs. Because of this, job shop schedule often has to be continuously updated in reaction to changes in production plan. Generally, the aim of preventive maintenance is to ensure production effectiveness and therefore the preventive maintenance models must have the ability to be adaptive to changes in job shop schedule. In this paper, a dynamic opportunistic preventive maintenance model is developed for a multi-component system with considering changes in job shop schedule. Whenever a job is completed, preventive maintenance opportunities arise for all the components in the system. An optimal maintenance practice is dynamically determined by maximizing the short-term cumulative opportunistic maintenance cost savings for the system. The numerical example shows that the scheme obtained by the proposed model can effectively address the preventive maintenance scheduling problem caused by the changes in job shop schedule and is more efficient than the ones based on two other commonly used preventive maintenance models.

  15. Energy Systems High-Pressure Test Laboratory | Energy Systems Integration

    Science.gov (United States)

    Facility | NREL Energy Systems High-Pressure Test Laboratory Energy Systems High-Pressure Test Laboratory In the Energy Systems Integration Facility's High-Pressure Test Laboratory, researchers can safely test high-pressure hydrogen components. Photo of researchers running an experiment with a hydrogen fuel

  16. Gas permeability of bentonite barriers: development, construction and testing of a measurement system

    Directory of Open Access Journals (Sweden)

    Heraldo Nunes Pitanga

    Full Text Available Abstract This article proposes a testing device to quickly and reliably estimate the gas permeability of bentonite-based clay barriers used in landfill cover systems. The testing methodology is based on a transient gas flow regime that passes through the barrier, therefore not requiring the use of sophisticated equipment that aim to maintain constant differential pressure and measure the gas flow, common requirements for testing methods under a permanent flow regime. To confirm the feasibility of the proposed technique, tests were performed on a pure hydrated bentonite layer, which subsequently encompassed samples of geosynthetic clay liner (GCL at different moisture contents. Geosynthetic clay liners are often selected as a part of the barrier layer for cover systems in solid waste landfills to prevent infiltration of rainfall and migration of biogas into the atmosphere. The results confirmed the equipment reliability and differentiate the different responses of the gas flow barriers studied, considering their different compositions and different moistures.

  17. Electronic security systems better ways to crime prevention

    CERN Document Server

    Walker, Philip

    2013-01-01

    Electronic Security Systems: Better Ways to Crime Prevention teaches the reader about the application of electronics for security purposes through the use of case histories, analogies, anecdotes, and other related materials. The book is divided into three parts. Part 1 covers the concepts behind security systems - its objectives, limitations, and components; the fundamentals of space detection; detection of intruder movement indoors and outdoors; surveillance; and alarm communication and control. Part 2 discusses equipments involved in security systems such as the different types of sensors,

  18. Evolution of a test article handling system for the SP-100 ground engineering system test

    International Nuclear Information System (INIS)

    Shen, E.J.; Schweiger, L.J.; Miller, W.C.; Gluck, R.; Devies, S.M.

    1987-04-01

    A simulated space environment test of a flight prototypic SP-100 reactor, control system, and flight shield will be conducted at the Hanford Engineering Development Laboratory (HEDL). The flight prototypic components and the supporting primary heat removal system are collectively known as the Nuclear Assembly Test Article (TA). The unique configuration and materials of fabrication for the Test Article require a specialized handling facility to support installation, maintenance, and final disposal operations. Westinghouse Hanford Company, the Test Site Operator, working in conjunction with General Electric Company, the Test Article supplier, developed and evaluated several handling concepts resulting in the selection of a reference Test Article Handling System. The development of the reference concept for the handling system is presented

  19. Testing and analysis to determine the shell thickness required to prevent puncture

    International Nuclear Information System (INIS)

    Ammerman, D.J.; Radloff, H.D.; Eifert, E.J.

    1998-05-01

    Type B radioactive material packages are required to withstand a hypothetical puncture accident of a free fall from a height of one meter onto a 15 cm diameter mild steel puncture probe. For many packages it is desirable to have this accident event not result in puncture or tearing of the outer shell of the package. The wall thickness necessary to prevent this has historically been determined by test or the use of empirical relations. This technique generally results in overly conservative designs, but the degree of conservatism is uncertain. The use of modem finite element codes to determine package response to puncture accidents can result in designs that are both safe and economical. The work reported in this paper is aimed at developing a method to analytically determine the wall thickness required to prevent puncture. For designers and regulators to have confidence in this analytical method, however, it must be benchmarked against test results. A series of tests has been conducted with differing shell thicknesses, shell materials of mild steel and stainless steel, and shell backing materials of lead, foam, and air. The results of these tests have been compared with pre-test analytical predictions of the response obtained from the nonlinear transient dynamic finite element program PRONTO-2D. From this comparison it can be seen that the finite element method can accurately predict the response of packages to puncture accidents. This implies that an analytical technique based on the finite element method can be used to design packages having known response and margin of safety against tearing of the outer shell. In addition, the analytical technique can accurately predict the deformed shape of the package following the test. This may be important for subsequent calculations, such as external dose and heat input during a thermal event

  20. The LoTrach system: its role in the prevention of ventilator-associated pneumonia.

    Science.gov (United States)

    Fletcher, Andrew J W; Ruffell, Alison J; Young, Peter J

    2008-01-01

    To discuss the development of the LoTrach system in light of current evidence around the prevention of ventilator-associated pneumonia (VAP) and its practical application in the intensive care setting. VAP causes substantial morbidity and mortality in ventilated patients in the Intensive Care Unit (ICU), increases length of stay in ICU and is extremely costly. Strategies are needed to reduce the risk of VAP. We examine the need for an endotracheal tube (ETT) specifically designed for the critically-ill patient, the development of the LoTrach system from conception to production, and the role of the various components of the system in preventing VAP. Early issues in implementing this revolutionary equipment into ICU are explored and three case studies highlight advantages of this system. The LoTrach system has been designed to facilitate the provision of a number of evidence-based interventions that have been shown to reduce VAP. Pulmonary aspiration is ubiquitous with conventional cuffs but prevented by the cuff of the LoTrach system when held at a constant and safe pressure against the tracheal wall with a cuff pressure controller. Other aspects incorporated in the ETT are aimed at clearing the secretions from the subglottic space, preventing tube occlusion and accidental extubation, and avoiding damage to the airway. In this way the LoTrach system employs a multifactorial approach to the prevention of VAP and the cost savings from LoTrach rather than a standard ETT will be considerable because of an average 3 day reduction in ICU length of stay related to this. It thus has the potential to be a very useful tool in the ICU setting in the prevention of VAP.

  1. Defining Design Limits of a Portable Radiation Dispersion Prevention System

    Energy Technology Data Exchange (ETDEWEB)

    Kang Seong Woo; Yim, Man Sung [KAIST, Daejeon (Korea, Republic of)

    2016-05-15

    To the eyes of the general public, however, reducing the chance of such accident is not enough. A typical engineer views a risk as a combination of both consequences and likelihoods, whereas an ordinary person may only consider consequences. The implementations of better regulations, improved human operator actions, and installations of extra safety systems may reduce the chance of having uncontrolled accident practically to zero, yet the public still fears having nuclear reactors. One such barrier system is a portable suction-based radiation dispersion prevention system, called Integrated Portable Suction-Centrifugal Filtration System (IPS-CFS). To design such systems, detailed information about the radioactive source term at the release point to the environment must be available to draw design limits. The preliminary design limits of the IPS-CFS are presented in this paper. It may seem challenging to design a comprehensive radioactive dispersion system that can successfully prevent such extreme accident conditions, especially due to the releases from high pressure. However, as more technologies develop and more realistic source term analyses are performed, it may be possible to develop such a public relief technology. With the development of such technology that can effectively prevent the dispersion of the uncontrolled radioactive releases in case of another Fukushima-like accident, it will result in increased safety of the nuclear power plants for both the public and the workers and may contribute to the increase in the public acceptance of nuclear energy.

  2. Space Fission System Test Effectiveness

    International Nuclear Information System (INIS)

    Houts, Mike; Schmidt, Glen L.; Van Dyke, Melissa; Godfroy, Tom; Martin, James; Bragg-Sitton, Shannon; Dickens, Ricky; Salvail, Pat; Harper, Roger

    2004-01-01

    Space fission technology has the potential to enable rapid access to any point in the solar system. If fission propulsion systems are to be developed to their full potential, however, near-term customers need to be identified and initial fission systems successfully developed, launched, and utilized. One key to successful utilization is to develop reactor designs that are highly testable. Testable reactor designs have a much higher probability of being successfully converted from paper concepts to working space hardware than do designs which are difficult or impossible to realistically test. ''Test Effectiveness'' is one measure of the ability to realistically test a space reactor system. The objective of this paper is to discuss test effectiveness as applied to the design, development, flight qualification, and acceptance testing of space fission systems. The ability to perform highly effective testing would be particularly important to the success of any near-term mission, such as NASA's Jupiter Icy Moons Orbiter, the first mission under study within NASA's Project Prometheus, the Nuclear Systems Program

  3. Status on system inspection and preventive maintenance of HANARO

    International Nuclear Information System (INIS)

    Kim, Young-Ki; Cho, Yeong-Garp; Kwag, Byung-Ho

    1999-01-01

    The HANARO is a 30 MW open pool type multi-purpose research reactor with forced light water coolant/moderator flows and heavy water annular reflector. The relatively small reactor core uses a low enriched fuel and is designed to maximize the power density, thus providing the required neutron flux for various research activities. It is mainly used for radioisotope production, nuclear material testing and neutron physics experiments. The initial criticality was achieved February 1995. Considering the importance of their functionality from the safety point of view, some components and equipment are categorized into a nuclear safety grade. There are three different inspection activities for the various reactor systems and components - a Surveillance Inspection(SI) for the safety grades and a Periodic Inspection (PI) for the non-safety grades and In-Service Inspection (ISI) for the ASME Sec.III components. All of the SIs are specified and required by the safety analysis report. The SI also differs from the PI in such a point that all kinds of activities for the SIs should be accompanied by an appropriate quality assurance, while for the PIs it is not necessarily mandatory. In addition, the inspection results for the SIs should go through an examination from regulatory body every two years and specific functions of the critical components or systems are demonstrated under the witness by the governmental inspector. The ISI is required and carried out as per international codes and standards as well as Korean atomic energy regulations. There are 54 SIs, 25 PIs and 4 ISIs for the HANARO. This paper concentrates on the managing strategy and its practices for the SIs and ISIs of the safety-related components, currently being done at HANARO. Most parts of the inspections fall into a group for the periodic performance testing and/or equipment calibration. Some mechanical inspections like a torque measurement are grouped into a preventive maintenance. Lastly the ASME Sec

  4. A computer based system for prioritizing pollution prevention opportunity assessments at SNL/NM

    International Nuclear Information System (INIS)

    Custer, M.S.; Leishman, N.L.; Walsh, M.L.; Nelson, J.D.; Davis, R.L.; Bueno, N.C.

    1996-01-01

    Prioritizing waste generators is necessary to determine which are the best candidates for Pollution Prevention Opportunity Assessments (PPOAs). This paper describes the Sandia National Laboratories/New Mexico (SNL/NM) PPOA Ranking System. The system uses a multimedia approach that considers hazardous and radioactive waste disposal data, and hazardous chemical usage data (from which air emissions are extrapolated). Pollution prevention information is included, from the SNL Pollution Prevention Opportunities database that identifies waste streams that have readily apparent pollution prevention opportunities. The system also considers the relative costs of waste management and the chargeback fees paid for waste generation. From these data, organizations are ranked with an algorithm developed in Microsoft Access trademark on a personal computer. The concept could readily be transferred to other facilities needing to decide where to perform PPOAs

  5. Prevention for possible microbiologically influenced corrosion (MIC) in RHLWE flush water system

    International Nuclear Information System (INIS)

    Hsu, T.C.; Jenkins, C.F.

    1995-01-01

    This report is in response to the request to provide a recommendation for the prevention of possible microbiologically influenced corrosion (MIC) for the RHLWE (Replacement High-Level Waste Evaporator) flush water (FW) system. The recent occurrences of MIC at DWPF prompted HLWE to evaluate the possibility of MIC occurring in this 304L stainless steel RHLWE flush water system. Concern was heightened by the fact that the well water used and the other conditions at H-Tank Farm are similar to those at DWPF. However, only one known leak has occurred in the existing 304L evaporator flush water systems in either tank farm (in 1H system), and no MIC Corrosion has been confirmed in the tank farm area. The design of the RHLWE flush water system (completed long before the occurrence of MIC at DWPF) was modeled after the existing evaporator flush water systems and did not specifically include MIC prevention considerations. Therefore, MIC prevention was not specifically considered during the design phase of this flush water system. The system is presently being installed. After an extensive evaluation, a task team concluded that the best biocide to prevent the occurrence of MIC would be NaOH at fairly low concentration. Sodium hydroxide (NaOH) is optimal in this application, because of its effectiveness, low cost, and familiarity to the Operations personnel (see Appendix A). However, it is the opinion of the task group that application should be withheld until MIC corrosion is demonstrated in the system

  6. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  7. Hydrate prevention in petroleum production sub sea system

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Paula L.F.; Rocha, Humberto A.R. [Universidade Estacio de Sa (UNESA), Rio de Janeiro, RJ (Brazil); Rodrigues, Antonio P. [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil)

    2012-07-01

    In spite of the merits of the several hydrate prevention techniques used nowadays, such as: chemical product injection for inhibition and use of thick thermal insulate lines; hydrates per times happen and they are responsible for considerable production losses. Depressurization techniques can be used so much for prevention as in the remediation. Some hydrate removal techniques need a rig or vessel, resources not readily available and with high cost, reason that limits such techniques just for remediation and not for prevention. In the present work it is proposed and described an innovative depressurization system, remote and resident, for hydrate prevention and removal, applicable as for individual sub sea wells as for grouped wells by manifold. Based on low cost jet pumps, without movable parts and with a high reliability, this technique allows hydrate prevention or remediation in a fast and remote way, operated from the production unit. The power fluid line and fluid return line can be integrated in the same umbilical or annulus line structure, without significant increase in the construction costs and installation. It is not necessary to wait for expensive resource mobilization, sometimes not available quickly, such as: vessels or rigs. It still reduces the chemical product consumption and permits to depressurized stopped lines. Other additional advantage, depressurization procedure can be used in the well starting, removing fluid until riser emptying. (author)

  8. A lightning prevention system for nuclear operations

    International Nuclear Information System (INIS)

    Lanzoni, J.A.; Carpenter, R.B.; Tinsley, R.H.

    1994-01-01

    Lightning presents a significant threat to the uninterrupted operation of nuclear power generation facilities. There exists two categories of lightning protection systems-collectors and preventors. Collectors are air terminals, overhead shield wires and other devices designed to collect incoming lightning strikes. Preventors, on the other hand, lower the electrical potential between a thundercloud and ground to a level lower than that required to collect a strike. The Dissipation Array reg-sign Systems prevents lightning strikes from terminating in the protected area, consequently eliminating both the direct hazard and indirect effects of lightning. Over 1,600 Dissipation Array reg-sign Systems are currently in service, with more than 10,500 system-years of operating experience and a historical success rate of over ninety-nine percent. Lightning Eliminators ampersand Consultants has fulfilled 24 contracts for Dissipation Array reg-sign Systems at nuclear power generation facilities

  9. Food systems approach to cancer prevention.

    Science.gov (United States)

    Vanamala, Jairam

    2017-08-13

    New cancer cases are expected to surge 57% worldwide in the next two decades. The greatest burden will be in low- and middle-income countries that are ill equipped to face this epidemic. Similarly, in the United States, low-income populations are at greater risk for cancer. As most cancers contain over 50 genetic alterations, and as these alterations define dysregulation of over 10 different critical cellular signaling pathways, a "silver bullet" treatment is not effective against most cancers. Instead, the latest World Cancer Report (2012) suggests a research shift toward developing prevention strategies for cancer. Accumulating evidence suggests that a diet high in plant-based foods is preventive of a variety of chronic diseases, including cancer. A plethora of bioactive compounds-such as polyphenols, glucosinolates and carotenoids in fruits, vegetables, grains, and legumes-are shown to suppress a variety of biological capabilities required for tumor growth. While much research has shown that plant bioactive compounds can suppress sustained proliferative signaling, angiogenesis, and metastasis, as well as promote cancer stem cell apoptosis, public health campaigns to increase fruit and vegetable consumption have, overall, been less effective than desired. Thus, there is a need for innovative strategies to support increased consumption of bioactive compounds for cancer prevention particularly in vulnerable populations. Many practices of the farm-to-fork continuum, including preharvest practices, postharvest storage, and processing and consumer practices, affect a food's bioactive compound content, composition, and chemopreventive bioactivity. Food system practices may be adjusted to reduce the toxic compound levels (e.g., glycoalkaloids in potatoes) and improve the bioactive compound profile, thus, elevate the cancer fighting properties of fruits, vegetables, and other food products. This review presents current scientific evidence outlining farm-to-fork effects

  10. Development and psychometric testing of a new instrument to measure factors influencing women's breast cancer prevention behaviors (ASSISTS).

    Science.gov (United States)

    Khazaee-Pool, Maryam; Majlessi, Fereshteh; Montazeri, Ali; Pashaei, Tahereh; Gholami, Ali; Ponnet, Koen

    2016-07-22

    Breast cancer preventive behaviors have an extreme effect on women's health. Despite the benefits of preventive behaviors regarding breast cancer, they have not been implemented as routine care for healthy women. To assess this health issue, a reliable and valid scale is needed. The aim of the present study is to develop and examine the psychometric properties of a new scale, called the ASSISTS, in order to identify factors that affect women's breast cancer prevention behaviors. A multi-phase instrument development method was performed to develop the questionnaire from February 2012 to September 2014. The item pool was generated based on secondary analyses of previous qualitative data. Then, content and face validity were applied to provide a pre-final version of the scale. The scale validation was conducted with a sample of women recruited from health centers affiliated with Tehran University of Medical Sciences. The construct validity (both exploratory and confirmatory), convergent validity, discriminate validity, internal consistency reliability and test-retest analysis of the questionnaire were tested. Fifty-eight items were initially extracted from the secondary analysis of previous qualitative data. After content validity, this was reduced to 49 items. The exploratory factor analysis revealed seven factors (Attitude, supportive systems, self-efficacy, information seeking, stress management, stimulant and self-care) containing 33 items that jointly accounted for 60.62 % of the observed variance. The confirmatory factor analysis showed a model with appropriate fitness for the data. The Cronbach's alpha coefficient for the subscales ranged from 0.68 to 0.85, and the Intraclass Correlation Coefficient (ICC) ranged from 0.71 to 0.98; which is well above the acceptable thresholds. The findings showed that the designed questionnaire was a valid and reliable instrument for assessing factors affecting women's breast cancer prevention behaviors that can be used both

  11. A Real Time Approach to Theft Prevention in the field of Transportation System

    Directory of Open Access Journals (Sweden)

    Vartika Mehta

    2016-06-01

    Full Text Available This paper report discusses a theft prevention system, which can prevent the theft and also can be track the object. This system is capable to tracking the vehicle as well as theft prevention. An R.F. module is use to exchange the information regarding vehicle and owner of the vehicle with police control room or SOS services. The vehicle can be track with the help of R.F. receiver. A DTMF based fuel lock has been attached in this system. A cell phone with SIM card has been attached with DTMF IC. The fuel flow in the vehicle can be controlled by give a call to this cell phone. This system has been controlled by a microcontroller which can make the system cost effective, low power consumption, effective and reliable.

  12. Test results of HTTR control system

    International Nuclear Information System (INIS)

    Motegi, Toshihiro; Iigaki, Kazuhiko; Saito, Kenji; Sawahata, Hiroaki; Hirato, Yoji; Kondo, Makoto; Shibutani, Hideki; Ogawa, Satoru; Shinozaki, Masayuki; Mizushima, Toshihiko; Kawasaki, Kozo

    2006-06-01

    The plant control performance of the IHX helium flow rate control system, the PPWC helium flow rate control system, the secondary helium flow rate control system, the inlet temperature control system, the reactor power control system and the outlet temperature control system of the HTTR are obtained through function tests and power-up tests. As the test results, the control systems show stable control response under transient condition. Both of inlet temperature control system and reactor power control system shows stable operation from 30% to 100%, respectively. This report describes the outline of control systems and test results. (author)

  13. Moisture absorption characteristics of the Orbiter thermal protection system and methods used to prevent water ingestion

    Science.gov (United States)

    Schomburg, C.; Dotts, R. L.; Tillian, D. J.

    1983-01-01

    The Space Shuttle Orbiter's silica tile Thermal Protection System (TPS) is beset by the moisture absorption problems inherently associated with low density, highly porous insulation systems. Attention is presently given to the comparative success of methods for the minimization and/or prevention of water ingestion by the TPS tiles, covering the development of water-repellent agents and their tile application techniques, flight test program results, and materials improvements. The use of external films for rewaterproofing of the TPS tiles after each mission have demonstrated marginal to unacceptable performance. By contrast, a tile interior waterproofing agent has shown promise.

  14. Preventive maintenance and load testing of fixed position cranes in support of major operations

    International Nuclear Information System (INIS)

    Detrick, C.K.

    1980-01-01

    This paper will address load testing and preventive maintenance of fixed in-place cranes in general, and maintenance and load testing of the 200 ton Polar Gantry Crane at the FFTF in particular. This paper also covers the installation of a 100-ton bridge crane in the FFTF's Reactor Service Building, as well as use of these cranes in making important lifts of FFTF equipment

  15. Prevention of atrial fibrillation by Renin-Angiotensin system inhibition a meta-analysis

    DEFF Research Database (Denmark)

    Schneider, Markus; Hua, Tsushung A; Böhm, Michael

    2010-01-01

    The authors reviewed published clinical trial data on the effects of renin-angiotensin system (RAS) inhibition for the prevention of atrial fibrillation (AF), aiming to define when RAS inhibition is most effective.......The authors reviewed published clinical trial data on the effects of renin-angiotensin system (RAS) inhibition for the prevention of atrial fibrillation (AF), aiming to define when RAS inhibition is most effective....

  16. System care improves trauma outcome: patient care errors dominate reduced preventable death rate.

    Science.gov (United States)

    Thoburn, E; Norris, P; Flores, R; Goode, S; Rodriguez, E; Adams, V; Campbell, S; Albrink, M; Rosemurgy, A

    1993-01-01

    A review of 452 trauma deaths in Hillsborough County, Florida, in 1984 documented that 23% of non-CNS trauma deaths were preventable and occurred because of inadequate resuscitation or delay in proper surgical care. In late 1988 Hillsborough County organized a County Trauma Agency (HCTA) to coordinate trauma care among prehospital providers and state-designated trauma centers. The purpose of this study was to review county trauma deaths after the inception of the HCTA to determine the frequency of preventable deaths. 504 trauma deaths occurring between October 1989 and April 1991 were reviewed. Through committee review, 10 deaths were deemed preventable; 2 occurred outside the trauma system. Of the 10 deaths, 5 preventable deaths occurred late in severely injured patients. The preventable death rate has decreased to 7.0% with system care. The causes of preventable deaths have changed from delayed or inadequate intervention to postoperative care errors.

  17. Testing lifting systems in nuclear facilities

    International Nuclear Information System (INIS)

    Kling, H.; Laug, R.

    1984-01-01

    Lifting systems in nuclear facilities must be inspected at regular intervals after having undergone their first acceptance test. These inspections are frequently carried out by service firms which not only employ the skilled personnel required for such jobs but also make available the necessary test equipment. The inspections in particular include a number of sophisticated load tests for which test load systems have been developed to allow lifting systems to be tested so that reactor specific boundary conditions are taken into account. In view of the large number of facilities to be inspected, the test load system is a modular system. (orig.) [de

  18. Application of system safety engineering techniques for hazard prevention at the Superconducting Super Collider

    International Nuclear Information System (INIS)

    Hendrix, B.L.

    1991-01-01

    A primary goal of the Superconducting Super Collider Laboratory (SSCL) is to establish an exemplary safety program. Achieving this goal requires leadership, planning, coordination, and technical know-how. To ensure that safety is an inherent part of the design, the Environment, Safety and Health Office employs a systems engineering discipline and process known as System Safety. The goal of System Safety - hazard prevention - is accomplished by analyzing systems to identify hazards and to evaluate design and procedural options and countermeasures to prevent, eliminate, mitigate, or control hazards and risks. Establishment of safety and human factors design criteria at the outset of the project prevents unsafe designs and safety violations, reduces risks, and helps in avoiding costly design changes later. This process requires a considerable amount of coordination with a variety of technical disciplines and safety professionals to integrate methods of hazard prevention, mitigation, and risk reduction throughout the system life-cycle

  19. An automatic window opening system to prevent drowning in vehicles sinking in water

    KAUST Repository

    Giesbrecht, Gordon G.; Percher, Michael; Brunet, Pierre; Richard, Yanik; Alexander, Marion; Bellemare, Alixandra; Rawal, Yash; Amassian, Aram; Mcdonald, Gerren

    2017-01-01

    Objective: Every year about 400 people die in submersed vehicles in North America and this number increases to 2,000–5,000 in all industrialized nations. The best way to survive is to quickly exit through the windows. An Automatic Window Opening System (AWOS; patent protected) was designed to sense when a vehicle is in water and to open the electric windows, but only when the vehicle is upright. Methods: The AWOS consists of a Detection Module (DM), in the engine compartment, and a Power Window Control Module (PWCM) inside the driver’s door. The DM contains a Water Sensor, a Level Sensor and a Microcontroller Unit (MCU). The Level Sensor provides the angular orientation of the car using a 3-axis acceleration sensor and prevents automatic window opening if the car is outside the orientation range (±20° in the roll axis, ±30° in the pitch axis, with a 2 s delay). Systems were installed on two cars and one SUV. A crane lowered vehicles in water either straight down (static tests) or by swinging the vehicles to produce forward movement (dynamic tests). Results: In all tests, when the vehicles landed upright, windows opened immediately and effectively. When vehicles landed inverted, or at a very steep angle, the system did not engage until an upright and level position was attained. Conclusions: This system may help decrease drowning deaths in sinking vehicles. If occupants do not know, or forget, what to do, the open window could hopefully prompt them to exit safely through that window.

  20. An automatic window opening system to prevent drowning in vehicles sinking in water

    KAUST Repository

    Giesbrecht, Gordon G.

    2017-07-12

    Objective: Every year about 400 people die in submersed vehicles in North America and this number increases to 2,000–5,000 in all industrialized nations. The best way to survive is to quickly exit through the windows. An Automatic Window Opening System (AWOS; patent protected) was designed to sense when a vehicle is in water and to open the electric windows, but only when the vehicle is upright. Methods: The AWOS consists of a Detection Module (DM), in the engine compartment, and a Power Window Control Module (PWCM) inside the driver’s door. The DM contains a Water Sensor, a Level Sensor and a Microcontroller Unit (MCU). The Level Sensor provides the angular orientation of the car using a 3-axis acceleration sensor and prevents automatic window opening if the car is outside the orientation range (±20° in the roll axis, ±30° in the pitch axis, with a 2 s delay). Systems were installed on two cars and one SUV. A crane lowered vehicles in water either straight down (static tests) or by swinging the vehicles to produce forward movement (dynamic tests). Results: In all tests, when the vehicles landed upright, windows opened immediately and effectively. When vehicles landed inverted, or at a very steep angle, the system did not engage until an upright and level position was attained. Conclusions: This system may help decrease drowning deaths in sinking vehicles. If occupants do not know, or forget, what to do, the open window could hopefully prompt them to exit safely through that window.

  1. An integrated production, inventory and preventive maintenance model for a multi-product production system

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Wenbin; Peng, Rui

    2015-01-01

    This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. - Highlights: • We propose an integrated economic production quantity and preventive maintenance model. • The situation that multiple products are produced on the same system alternately is studied. • Two situations are studied based on whether the downtime and the product quality can be ignored or not. • We use enumeration method and analytical method to select the optimal preventive maintenance policy, respectively. • We use the delay-time concept to model the preventive maintenance policy

  2. Field Testing of Energy-Efficient Flood-Damage-Resistant Residential Envelope Systems Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Aglan, H.

    2005-08-04

    The primary purpose of the project was to identify materials and methods that will make the envelope of a house flood damage resistant. Flood damage resistant materials and systems are intended to be used to repair houses subsequent to flooding. This project was also intended to develop methods of restoring the envelopes of houses that have been flooded but are repairable and may be subject to future flooding. Then if the house floods again, damage will not be as extensive as in previous flood events and restoration costs and efforts will be minimized. The purpose of the first pair of field tests was to establish a baseline for typical current residential construction practice. The first test modules used materials and systems that were commonly found in residential envelopes throughout the U.S. The purpose of the second pair of field tests was to begin evaluating potential residential envelope materials and systems that were projected to be more flood-damage resistant and restorable than the conventional materials and systems tested in the first pair of tests. The purpose of testing the third slab-on-grade module was to attempt to dry flood proof the module (no floodwater within the structure). If the module could be sealed well enough to prevent water from entering, then this would be an effective method of making the interior materials and systems flood damage resistant. The third crawl space module was tested in the same manner as the previous modules and provided an opportunity to do flood tests of additional residential materials and systems. Another purpose of the project was to develop the methodology to collect representative, measured, reproducible (i.e. scientific) data on how various residential materials and systems respond to flooding conditions so that future recommendations for repairing flood damaged houses could be based on scientific data. An additional benefit of collecting this data is that it will be used in the development of a standard test

  3. The role of noninvasive cardiovascular testing, applied clinical nutrition and nutritional supplements in the prevention and treatment of coronary heart disease.

    Science.gov (United States)

    Houston, Mark

    2018-03-01

    Numerous clinical trials suggest that we have reached a limit in our ability to decrease the incidence of coronary heart disease (CHD) and cardiovascular disease (CVD) utilizing the traditional diagnostic evaluation, prevention and treatment strategies for the top five cardiovascular risk factors of hypertension, diabetes mellitus, dyslipidemia, obesity and smoking. About 80% of heart disease (heart attacks, angina, coronary heart disease and congestive heart failure) can be prevented by optimal nutrition, optimal exercise, optimal weight and body composition, mild alcohol intake and avoiding smoking. Statistics show that approximately 50% of patients continue to have CHD or myocardial infarction (MI) despite presently defined 'normal' levels of the five risk factors listed above. This is often referred to as the 'CHD gap'. Novel and more accurate definitions and evaluations of these top five risk factors are required, such as 24 h ambulatory blood pressure (ABM) results, advanced lipid profiles, redefined fasting and 2 h dysglycemia parameters, a focus on visceral obesity and body composition and the effects of adipokines on cardiovascular risk. There are numerous traumatic insults from the environment that damage the cardiovascular system but there are only three finite vascular endothelial responses, which are inflammation, oxidative stress and immune vascular dysfunction. In addition, the concept of translational cardiovascular medicine is mandatory in order to correlate the myriad of CHD risk factors to the presence or absence of functional or structural damage to the vascular system, preclinical and clinical CHD. This can be accomplished by utilizing advanced and updated CV risk scoring systems, new and redefined CV risk factors and biomarkers, micronutrient testing, cardiovascular genetics, nutrigenomics, metabolomics, genetic expression testing and noninvasive cardiovascular testing.

  4. Prevention Service System Transformation Using "Communities That Care"

    Science.gov (United States)

    Brown, Eric C.; Hawkins, J. David; Arthur, Michael W.; Briney, John S.; Fagan, Abigail A.

    2011-01-01

    This study examines prevention system transformation as part of a community-randomized controlled trial of Communities That Care (CTC). Using data from surveys of community leaders, we examine differences between CTC and control communities 4.5 years after CTC implementation. Significantly higher levels of adopting a science-based approach to…

  5. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  6. Systems Thinking and Leadership: How Nephrologists Can Transform Dialysis Safety to Prevent Infections.

    Science.gov (United States)

    Wong, Leslie P

    2018-04-06

    Infections are the second leading cause of death for patients with ESKD. Despite multiple efforts, nephrologists have been unable to prevent infections in dialysis facilities. The American Society of Nephrology and the Centers for Disease Control and Prevention have partnered to create Nephrologists Transforming Dialysis Safety to promote nephrologist leadership and engagement in efforts to "Target Zero" preventable dialysis infections. Because traditional approaches to infection control and prevention in dialysis facilities have had limited success, Nephrologists Transforming Dialysis Safety is reconceptualizing the problem in the context of the complexity of health care systems and organizational behavior. By identifying different parts of a problem and attempting to understand how these parts interact and produce a result, systems thinking has effectively tackled difficult problems in dynamic settings. The dialysis facility is composed of different physical and human elements that are interconnected and affect not only behavior but also, the existence of a culture of safety that promotes infection prevention. Because dialysis infections result from a complex system of interactions between caregivers, patients, dialysis organizations, and the environment, attempts to address infections by focusing on one element in isolation often fail. Creating a sense of urgency and commitment to eradicating dialysis infections requires leadership and motivational skills. These skills are not taught in the standard nephrology or medical director curriculum. Effective leadership by medical directors and engagement in infection prevention by nephrologists are required to create a culture of safety. It is imperative that nephrologists commit to leadership training and embrace their potential as change agents to prevent infections in dialysis facilities. This paper explores the systemic factors contributing to the ongoing dialysis infection crisis in the United States and the role

  7. What Prevents Central Asian Migrant Workers from Accessing HIV Testing? Implications for Increasing HIV Testing Uptake in Kazakhstan.

    Science.gov (United States)

    Davis, Alissa; Terlikbayeva, Assel; Terloyeva, Dina; Primbetova, Sholpan; El-Bassel, Nabila

    2017-08-01

    Several barriers prevent key populations, such as migrant workers, from accessing HIV testing. Using data from a cross-sectional study among Central Asian migrant workers (n = 623) in Kazakhstan, we examined factors associated with HIV testing. Overall, 48% of participants had ever received an HIV test. Having temporary registration (AOR 1.69; (95% CI [1.12-2.56]), having an employment contract (AOR 2.59; (95% CI [1.58-4.23]), being able to afford health care services (AOR 3.61; (95% CI [1.86-7.03]) having a medical check-up in the past 12 months (AOR 1.85; 95% CI [1.18-2.89]), and having a regular doctor (AOR 2.37; 95% CI [1.20-4.70]) were associated with having an HIV test. HIV testing uptake among migrants in Kazakhstan falls far short of UNAIDS 90-90-90 goals. Intervention strategies to increase HIV testing among this population may include initiatives that focus on improving outreach to undocumented migrants, making health care services more affordable, and linking migrants to health care.

  8. Technologies, Methodologies and Challenges in Network Intrusion Detection and Prevention Systems

    Directory of Open Access Journals (Sweden)

    Nicoleta STANCIU

    2013-01-01

    Full Text Available This paper presents an overview of the technologies and the methodologies used in Network Intrusion Detection and Prevention Systems (NIDPS. Intrusion Detection and Prevention System (IDPS technologies are differentiated by types of events that IDPSs can recognize, by types of devices that IDPSs monitor and by activity. NIDPSs monitor and analyze the streams of network packets in order to detect security incidents. The main methodology used by NIDPSs is protocol analysis. Protocol analysis requires good knowledge of the theory of the main protocols, their definition, how each protocol works.

  9. Minicomputer controlled test system for process control and monitoring systems

    International Nuclear Information System (INIS)

    Worster, L.D.

    A minicomputer controlled test system for testing process control and monitoring systems is described. This system, in service for over one year, has demonstrated that computerized control of such testing has a real potential for expanding the scope of the testing, improving accuracy of testing, and significantly reducing the time required to do the testing. The test system is built around a 16-bit minicomputer with 12K of memory. The system programming language is BASIC with the addition of assembly level routines for communication with the peripheral devices. The peripheral devices include a 100 channel scanner, analog-to-digital converter, visual display, and strip printer. (auth)

  10. Assessment of Food Waste Prevention and Recycling Strategies Using a Multilayer Systems Approach.

    Science.gov (United States)

    Hamilton, Helen A; Peverill, M Samantha; Müller, Daniel B; Brattebø, Helge

    2015-12-15

    Food waste (FW) generates large upstream and downstream emissions to the environment and unnecessarily consumes natural resources, potentially affecting future food security. The ecological impacts of FW can be addressed by the upstream strategies of FW prevention or by downstream strategies of FW recycling, including energy and nutrient recovery. While FW recycling is often prioritized in practice, the ecological implications of the two strategies remain poorly understood from a quantitative systems perspective. Here, we develop a multilayer systems framework and scenarios to quantify the implications of food waste strategies on national biomass, energy, and phosphorus (P) cycles, using Norway as a case study. We found that (i) avoidable food waste in Norway accounts for 17% of sold food; (ii) 10% of the avoidable food waste occurs at the consumption stage, while industry and retailers account for only 7%; (iii) the theoretical potential for systems-wide net process energy savings is 16% for FW prevention and 8% for FW recycling; (iv) the theoretical potential for systems-wide P savings is 21% for FW prevention and 9% for FW recycling; (v) while FW recycling results in exclusively domestic nutrient and energy savings, FW prevention leads to domestic and international savings due to large food imports; (vi) most effective is a combination of prevention and recycling, however, FW prevention reduces the potential for FW recycling and therefore needs to be prioritized to avoid potential overcapacities for FW recycling.

  11. Pilot Testing an Internet-Based STI and HIV Prevention Intervention With Chilean Women

    Science.gov (United States)

    Villegas, Natalia; Santisteban, Daniel; Cianelli, Rosina; Ferrer, Lilian; Ambrosia, Todd; Peragallo, Nilda; Lara, Loreto

    2015-01-01

    Purpose The incidence of sexually transmitted infections (STIs) and human immunodeficiency virus (HIV) is high among young Chilean women, and there are no STI or HIV prevention interventions available to them that incorporate technology. The purpose of this study was to investigate the preliminary efficacy of an Internet-based STI and HIV prevention intervention (I-STIPI) for Chilean young women on measures of STI- and HIV-related information, motivation, behavioral skills, and preventive behaviors. Design This is a pretest-posttest study. Forty young Chilean women between 18 and 24 years of age participated in an investigation of the I-STIPI’s preliminary efficacy on STI and HIV prevention-related outcomes between baseline and a postintervention assessment. The intervention consisted of four online modules. Data collection was conducted in Santiago, Chile. Paired-samples t test analysis was used to determine whether there were significant differences in each of the outcome variables. Findings After receiving I-STIPI, women reported a significant increase in levels of STI- and HIV-related knowledge, attitudes toward the use of condoms and perceived self-efficacy, and a reduction of risky sexual behaviors with uncommitted partners. Conclusions The I-STIPI showed promise as an Internet-based intervention that can reduce barriers to accessing preventive interventions and increase STI and HIV preventive behaviors in young Chilean women. Clinical Relevance The study provided important information about the ability of an Internet-based intervention to reduce young women’s risk factors and to provide positive preliminary efficacy on STI- and HIV-related outcomes. Internet-based interventions can eliminate many barriers to receiving prevention interventions and may prove to be cost effective. PMID:25410132

  12. Integrated System for Monitoring and Prevention in Obstetrics-Gynaecology.

    Science.gov (United States)

    Robu, Andreea; Gauca, Bianca; Crisan-Vida, Mihaela; Stoicu-Tivadar, Lăcrămioara

    2016-01-01

    A better monitoring of pregnant women, mainly during the third trimester of pregnancy and an easy communication between physician and patients are very important for the prevention and good health of baby and mother. The paper presents an integrated system as support for the Obstetrics - Gynaecology domain consisting in two modules: a mobile application, ObGynCare, dedicated to the pregnant women and a new component of the Obstetrics-Gynaecology Department Information System dedicated to the physicians for a better monitoring of the pregnant women. The mobile application informs the pregnant women about their status, permits them to introduce glycaemia and weight values and has as option pulse and blood pressure acquisition from a smart sensor and provides results in a graphic format. It also provides support for easy patient-doctor communication related to any health problems. ObGyn Care offers nutrition recommendations and gives the pregnant women the possibility to enter a social space of common interests using social networks (Facebook) to exchange useful and practical information. Data collected from patients and from sensor are stored on the cloud and the physician may access the information and analyse it. The extended module of the Obstetrics-Gynaecology Department Information System already developed supports the physicians to visualize weekly, monthly, or on a trimester, the patient data and to discuss with her through the chat module. The mobile application is in test by pregnant women and medical personnel.

  13. Fatigue tests of dowel-socket systems

    International Nuclear Information System (INIS)

    Chiang, D.D.

    1976-01-01

    A test program was conducted to determine the fatigue behavior of LHTGR fuel element dowel/socket systems. Two dowel/socket systems, namely, a four-dowel system and a five-dowel system, were tested to failure under shear loads applied through a fatigue test apparatus to simulate repetitive loading during a seismic event

  14. System Performance and Testing

    NARCIS (Netherlands)

    Frei, U.; Oversloot, H.

    2004-01-01

    This chapter compares and contrasts the system performance of two widely used solar thermal systems using testing and simulation programs. Solar thermal systems are used in many countries for heating domestically used water. In addition to the simple thermosiphon systems, better designed pumped

  15. Fifty communities putting prevention to work: accelerating chronic disease prevention through policy, systems and environmental change.

    Science.gov (United States)

    Bunnell, Rebecca; O'Neil, Dara; Soler, Robin; Payne, Rebecca; Giles, Wayne H; Collins, Janet; Bauer, Ursula

    2012-10-01

    The burden of preventable chronic diseases is straining our nation's health and economy. Diseases caused by obesity and tobacco use account for the largest portions of this preventable burden. CDC funded 50 communities in 2010 to implement policy, systems, and environmental (PSE) interventions in a 2-year initiative. Funded communities developed PSE plans to reduce obesity, tobacco use, and second-hand smoke exposure for their combined 55 million residents. Community outcome objectives and milestones were categorized by PSE interventions as they related to media, access, promotion, pricing, and social support. Communities estimated population reach based on their jurisdiction's census data and target populations. The average proportion of each community's population that was reached was calculated for each intervention category. Outcome objectives that were achieved within 12 months of program initiation were identified from routine program records. The average proportion of a community's jurisdictional population reached by a specific intervention varied across interventions. Mean population reach for obesity-prevention interventions was estimated at 35%, with 14 (26%) interventions covering over 50% of the jurisdictional populations. For tobacco prevention, mean population reach was estimated at 67%, with 16 (84%) interventions covering more than 50% of the jurisdictional populations. Within 12 months, communities advanced over one-third of their obesity and tobacco-use prevention strategies. Tobacco interventions appeared to have higher potential population reach than obesity interventions within this initiative. Findings on the progress and potential reach of this major initiative may help inform future chronic disease prevention efforts.

  16. Preventive maintenance measures and repeat tests on actuators

    International Nuclear Information System (INIS)

    Hueren, H.

    1990-01-01

    At Biblis Nuclear Power Station, about 1500 electrical actuators and variable speed drives of various model ranges and with various driving end speeds and actuating times are installed and about 600 of these are located in important safety engineering systems. In order to optimize the preventive maintenance measures on the drives, a data bank has been established into which are stored, in addition to the fixed type data of each drive, inter alia, statements about location of application, valve type, inspection cycle, calendar year of next maintenance, findings during inspection measures and causes of faults. Before each unit inspection, in addition to the inspection lists, the maintenance and installation records and also the associated job instructions are produced from this data processing equipment. (orig.) [de

  17. Moving alcohol prevention research forward-Part II: new directions grounded in community-based system dynamics modeling.

    Science.gov (United States)

    Apostolopoulos, Yorghos; Lemke, Michael K; Barry, Adam E; Lich, Kristen Hassmiller

    2018-02-01

    Given the complexity of factors contributing to alcohol misuse, appropriate epistemologies and methodologies are needed to understand and intervene meaningfully. We aimed to (1) provide an overview of computational modeling methodologies, with an emphasis on system dynamics modeling; (2) explain how community-based system dynamics modeling can forge new directions in alcohol prevention research; and (3) present a primer on how to build alcohol misuse simulation models using system dynamics modeling, with an emphasis on stakeholder involvement, data sources and model validation. Throughout, we use alcohol misuse among college students in the United States as a heuristic example for demonstrating these methodologies. System dynamics modeling employs a top-down aggregate approach to understanding dynamically complex problems. Its three foundational properties-stocks, flows and feedbacks-capture non-linearity, time-delayed effects and other system characteristics. As a methodological choice, system dynamics modeling is amenable to participatory approaches; in particular, community-based system dynamics modeling has been used to build impactful models for addressing dynamically complex problems. The process of community-based system dynamics modeling consists of numerous stages: (1) creating model boundary charts, behavior-over-time-graphs and preliminary system dynamics models using group model-building techniques; (2) model formulation; (3) model calibration; (4) model testing and validation; and (5) model simulation using learning-laboratory techniques. Community-based system dynamics modeling can provide powerful tools for policy and intervention decisions that can result ultimately in sustainable changes in research and action in alcohol misuse prevention. © 2017 Society for the Study of Addiction.

  18. Ovarian Cancer and BRCA1/2 Testing: Opportunities to improve clinical care and disease prevention

    Directory of Open Access Journals (Sweden)

    Katherine eKarakasis

    2016-05-01

    Full Text Available Without prevention or screening options available, ovarian cancer is the most lethal malignancy of the female reproductive tract. High grade serous ovarian cancer (HGSOC is the most common histologic subtype, and the role of germline BRCA1/2 mutation in predisposition and prognosis is established. Given the targeted treatment opportunities with PARP inhibitors, a predictive role for BRCA1/2 mutation has emerged. Despite recommendations to provide BRCA1/2 testing to all women with histologically confirmed HGSOC, uniform implementation remains challenging. The opportunity to review and revise genetic screening and testing practices will identify opportunities where universal adoption of BRCA1/2 mutation testing will impact and improve treatment of women with ovarian cancer. Improving education and awareness of genetic testing for women with cancer, as well as the broader general community, will help focus much needed attention on opportunities to advance prevention and screening programs in ovarian cancer. This is imperative not only for women with cancer, those at risk of developing cancer, but also for their first-degree relatives. In addition, BRCA1/2 testing may have direct implications for patients with other types of cancers, many which are now being found to have BRCA1/2 involvement.

  19. [Role and integration of technical prevention figures in the management system].

    Science.gov (United States)

    Bartolucci, G B; Santantonio, P; Casciani, M; Dagazzini, I

    2010-01-01

    The multifarious issues of health and safety at work require multi-disciplinary skills, both in the risk assessment and in the subsequent definition and management of preventive measures, and this requires a renewed operational protocol that supports integration and co-operation between the technical prevention figures. Thus, between occupational physicians and technical advisers there should be a concrete and fruitful interaction, which should not be episodic or occasional, but a modus operandi systematic and constant. In this contribution is discussed as the technical prevention figures should be included in the Health and Safety Management System and should make a specific contribution in defining corporate policies on prevention. In particular it is outlined the role that the occupational physician may play in the development of prevention and health promotion activities within the strategies of corporate social responsibility.

  20. System 80+ design features for severe accident prevention and mitigation

    International Nuclear Information System (INIS)

    Jacob, M.C.; Schneider, R.E.; Finnicum, D.J.

    1993-01-01

    ABB-CE, in cooperation with the US Department of Energy, is working to develop and certify the System 80+ design, which is ABB-CE's standardized evolutionary Advanced Light Water Reactor (ALWR) design. It incorporates design enhancements based on Probabilistic Risk Assessment (PRA) insights, guidance from the EPRI's Utility Requirements Document, and US NRC's Severe Accident Policy. Major severe accident prevention and mitigation design features of the system is discussed along with its conformance to EPRI URD guidance, as applicable. Computer simulation of a best estimate severe accident scenario is presented to illustrate the acceptable containment performance of the design. It is concluded that by considering severe accident prevention and mitigation early in the design process, the System 80+ design represents a robust plant design that has low core damage frequencies, low containment conditional failure probabilities, and acceptable deterministic containment performance under severe accident conditions

  1. Strategy of seismic disaster prevention plan of gas supply system in Great Tehran, Iran

    Energy Technology Data Exchange (ETDEWEB)

    Mohammadi, A.M.; Yousefi Pour, M.R. [Greater Tehran Gas Company, Tehran (Iran, Islamic Republic of); Yanou, Y.; Ogawa, Y.; Yamada, H. [Osaka Gas Co. Ltd., Osaka (Japan)

    2004-07-01

    Iran has suffered many devastating earthquakes. Tehran is surrounded by active faults including the North Tehran Fault and the South Ray Fault, making the city extremely vulnerable to large earthquakes. This paper proposes and outlines the basic anti-earthquake measures that would protect Greater Tehran Gas Company's (GTGC) gas supply systems from large earthquakes. Anti-earthquake measures focusing on reinforcing existing facilities and disaster prevention are detailed in this paper. The paper shows step-by-step procedures for the construction of a disaster-prevention system. The paper concludes that: GTGC's gas pipeline networks have high quake-resistance because they include welded steel pipes or polyethylene pipes; a gas remote shutoff system or gas automatic shut-off system should be installed as emergency measures in GTGC's earthquake disaster prevention measures; practical and actual training is also very important for all authorities, experts, engineers and staff involved in earthquake disaster prevention measures. 2 refs., 3 figs.

  2. Nutrition-Related Cancer Prevention Cognitions and Behavioral Intentions: Testing the Risk Perception Attitude Framework

    Science.gov (United States)

    Sullivan, Helen W.; Beckjord, Ellen Burke; Finney Rutten, Lila J.; Hesse, Bradford W.

    2008-01-01

    This study tested whether the risk perception attitude framework predicted nutrition-related cancer prevention cognitions and behavioral intentions. Data from the 2003 Health Information National Trends Survey were analyzed to assess respondents' reported likelihood of developing cancer (risk) and perceptions of whether they could lower their…

  3. Prevention of musculoskeletal disorders within management systems: A scoping review of practices, approaches, and techniques.

    Science.gov (United States)

    Yazdani, Amin; Neumann, W Patrick; Imbeau, Daniel; Bigelow, Philip; Pagell, Mark; Wells, Richard

    2015-11-01

    The purpose of this study was to identify and summarize the current research evidence on approaches to preventing musculoskeletal disorders (MSD) within Occupational Health and Safety Management Systems (OHSMS). Databases in business, engineering, and health and safety were searched and 718 potentially relevant publications were identified and examined for their relevance. Twenty-one papers met the selection criteria and were subjected to thematic analysis. There was very little literature describing the integration of MSD risk assessment and prevention into management systems. This lack of information may isolate MSD prevention, leading to difficulties in preventing these disorders at an organizational level. The findings of this review argue for further research to integrate MSD prevention into management systems and to evaluate the effectiveness of the approach. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  4. Conducting meta-analyses of HIV prevention literatures from a theory-testing perspective.

    Science.gov (United States)

    Marsh, K L; Johnson, B T; Carey, M P

    2001-09-01

    Using illustrations from HIV prevention research, the current article advocates approaching meta-analysis as a theory-testing scientific method rather than as merely a set of rules for quantitative analysis. Like other scientific methods, meta-analysis has central concerns with internal, external, and construct validity. The focus of a meta-analysis should only rarely be merely describing the effects of health promotion, but rather should be on understanding and explaining phenomena and the processes underlying them. The methodological decisions meta-analysts make in conducting reviews should be guided by a consideration of the underlying goals of the review (e.g., simply effect size estimation or, preferably theory testing). From the advocated perspective that a health behavior meta-analyst should test theory, the authors present a number of issues to be considered during the conduct of meta-analyses.

  5. Real-time graphic display system for ROSA-V Large Scale Test Facility

    International Nuclear Information System (INIS)

    Kondo, Masaya; Anoda, Yoshinari; Osaki, Hideki; Kukita, Yutaka; Takigawa, Yoshio.

    1993-11-01

    A real-time graphic display system was developed for the ROSA-V Large Scale Test Facility (LSTF) experiments simulating accident management measures for prevention of severe core damage in pressurized water reactors (PWRs). The system works on an IBM workstation (Power Station RS/6000 model 560) and accommodates 512 channels out of about 2500 total measurements in the LSTF. It has three major functions: (a) displaying the coolant inventory distribution in the facility primary and secondary systems; (b) displaying the measured quantities at desired locations in the facility; and (c) displaying the time histories of measured quantities. The coolant inventory distribution is derived from differential pressure measurements along vertical sections and gamma-ray densitometer measurements for horizontal legs. The color display indicates liquid subcooling calculated from pressure and temperature at individual locations. (author)

  6. Moving alcohol prevention research forward-Part I: introducing a complex systems paradigm.

    Science.gov (United States)

    Apostolopoulos, Yorghos; Lemke, Michael K; Barry, Adam E; Lich, Kristen Hassmiller

    2018-02-01

    The drinking environment is a complex system consisting of a number of heterogeneous, evolving and interacting components, which exhibit circular causality and emergent properties. These characteristics reduce the efficacy of commonly used research approaches, which typically do not account for the underlying dynamic complexity of alcohol consumption and the interdependent nature of diverse factors influencing misuse over time. We use alcohol misuse among college students in the United States as an example for framing our argument for a complex systems paradigm. A complex systems paradigm, grounded in socio-ecological and complex systems theories and computational modeling and simulation, is introduced. Theoretical, conceptual, methodological and analytical underpinnings of this paradigm are described in the context of college drinking prevention research. The proposed complex systems paradigm can transcend limitations of traditional approaches, thereby fostering new directions in alcohol prevention research. By conceptualizing student alcohol misuse as a complex adaptive system, computational modeling and simulation methodologies and analytical techniques can be used. Moreover, use of participatory model-building approaches to generate simulation models can further increase stakeholder buy-in, understanding and policymaking. A complex systems paradigm for research into alcohol misuse can provide a holistic understanding of the underlying drinking environment and its long-term trajectory, which can elucidate high-leverage preventive interventions. © 2017 Society for the Study of Addiction.

  7. Future Integrated Systems Concept for Preventing Aircraft Loss-of-Control Accidents

    Science.gov (United States)

    Belcastro, Christine M.; Jacobson, Steven r.

    2010-01-01

    Loss of control remains one of the largest contributors to aircraft fatal accidents worldwide. Aircraft loss-of-control accidents are highly complex in that they can result from numerous causal and contributing factors acting alone or (more often) in combination. Hence, there is no single intervention strategy to prevent these accidents. This paper presents future system concepts and research directions for preventing aircraft loss-of-control accidents.

  8. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  9. System for testing optical fibers

    Science.gov (United States)

    Golob, John E. [Olathe, KS; Looney, Larry D. [Los Alamos, NM; Lyons, Peter B. [Los Alamos, NM; Nelson, Melvin A. [Santa Barbara, CA; Davies, Terence J. [Santa Barbara, CA

    1980-07-15

    A system for measuring a combination of optical transmission properties of fiber optic waveguides. A polarized light pulse probe is injected into one end of the optical fiber. Reflections from discontinuities within the fiber are unpolarized whereas reflections of the probe pulse incident to its injection remain polarized. The polarized reflections are prevented from reaching a light detector whereas reflections from the discontinuities reaches the detector.

  10. Intravaginal rings as delivery systems for microbicides and multipurpose prevention technologies

    Directory of Open Access Journals (Sweden)

    Thurman AR

    2013-10-01

    Full Text Available Andrea Ries Thurman, Meredith R Clark, Jennifer Hurlburt, Gustavo F Doncel CONRAD, Department of Obstetrics and Gynecology, Eastern Virginia Medical School, Norfolk, VA, USA Abstract: There is a renewed interest in delivering pharmaceutical products via intravaginal rings (IVRs. IVRs are flexible torus-shaped drug delivery systems that can be easily inserted and removed by the woman and that provide both sustained and controlled drug release, lasting for several weeks to several months. In terms of women's health care products, it has been established that IVRs effectively deliver contraceptive steroids and steroids for the treatment of postmenopausal vaginal atrophy. A novel application for IVRs is the delivery of antiretroviral drugs for the prevention of human immunodeficiency virus (HIV genital infection. Microbicides are antiviral drugs delivered topically for HIV prevention. Recent reviews of microbicide IVRs have focused on technologies in development and optimizing ring design. IVRs have several advantages, including the ability to deliver sustained drug doses for long periods of time while bypassing first pass metabolism in the gut. IVRs are discreet, woman-controlled, and do not require a trained provider for placement or fitting. Previous data support that women and their male sexual partners find IVRs highly acceptable. Multipurpose prevention technology (MPT products provide protection against unintended/mistimed pregnancy and reproductive tract infections, including HIV. Several MPT IVRs are currently in development. Early clinical testing of new microbicide and MPT IVRs will require a focus on safety, pharmacokinetics and pharmacodynamics. Specifically, IVRs will have to deliver tissue concentrations of drugs that are pharmacodynamically active, do not cause mucosal alterations or inflammation, and do not change the resident microbiota. The emergence of resistance to antiretrovirals will need to be investigated. IVRs should not

  11. Integrating Pregnancy Prevention Into an HIV Counseling and Testing Program in Pediatric Primary Care.

    Science.gov (United States)

    Wheeler, Noah J; Upadhya, Krishna K; Tawe, Marie-Sophie; Tomaszewski, Kathy; Arrington-Sanders, Renata; Marcell, Arik V

    2018-04-11

    Certified health educator (CHE)-based HIV counseling and testing typically focus on HIV and sexually transmitted infection (STI) prevention only. A quality improvement initiative examined integrating assessment of reproductive life plans, counseling about pregnancy prevention, and contraception referral into a CHE-based HIV testing program. Between February 2014 and January 2017, in one urban pediatric primary care clinic serving patients aged 0-25, CHEs assessed sexual history, HIV risk, short-term (i.e., the next 6-12 months) pregnancy desire, and current contraception method and satisfaction among patients aged 13-25 who had ever had vaginal sex, using a standardized questionnaire. Data were analyzed using a de-identified administrative dataset that also tracked referrals to initiate contraception and actual method initiation. Of 1,211 patients, most (96%) reported no short-term pregnancy or partner pregnancy desire. Use of less effective or no contraception, as well as method dissatisfaction, was common. A high proportion of female patients referred to new methods opted for more effective methods (62%) and initiated these methods (76%); a high proportion of male patients opted for receipt of condoms (67%). Patients reporting short-term pregnancy desire reported higher rates of previous pregnancy and STIs. Program findings highlight the potential benefit of integrating assessment for and counseling about pregnancy prevention in a CHE-based HIV testing program. This can more effectively address the needs of patients with concomitant risks of STI/HIV and unintended pregnancy, and link patients who do not desire pregnancy to more effective methods. Copyright © 2018 The Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  12. Testing on air cleaning systems: Testing of the components in-place tests

    International Nuclear Information System (INIS)

    Billard, F.; Brion, J.

    1967-01-01

    The reliability of air cleaning systems is dependent on testing they are submitted to. Although in-place tests are the most important as they act as final tests upon achieved plants, component tests are necessary too. They allow detection of defective units before they are installed, partition of unit defects from mounting defects and they are more sensitive. For similar reasons, material teats are most useful. The various tests are described, about aerosol filters for one part, iodine trap for the other. The checked features are: materials nature, units sizes, efficiency, air resistance, flammability, humidity resistance, temperature resistance, adsorbent friability, etc... On iodine trapping systems, small check traps, working by-pass with the main trap are periodically subjected to efficiency test. This control allow to cut down the in-place tests frequency, particularly when poisoning from organic vapours is to be feared. (authors) [fr

  13. Development of training system to prevent accidents during decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    Jeong, Kwanseong; Moon, Jeikwon; Choi, Byungseon; Hyun, Dongjun; Lee, Jonghwan; Kim, Ikjune; Kim, Geunho; Seo, Jaeseok

    2014-01-01

    Decommissioning workers need familiarization with working environments because working environment is under high radioactivity and work difficulty during decommissioning of nuclear facilities. On-the-job training of decommissioning works could effectively train decommissioning workers but this training approach could consume much costs and poor modifications of scenarios. The efficiency of virtual training system could be much better than that of physical training system. This paper was intended to develop the training system to prevent accidents for decommissioning of nuclear facilities. The requirements for the training system were drawn. The data management modules for the training system were designed. The training system of decommissioning workers was developed on the basis of virtual reality which is flexibly modified. The visualization and measurement in the training system were real-time done according as changes of the decommissioning scenario. It can be concluded that this training system enables the subject to improve his familiarization about working environments and to prevent accidents during decommissioning of nuclear facilities

  14. Development of training system to prevent accidents during decommissioning of nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwanseong; Moon, Jeikwon; Choi, Byungseon; Hyun, Dongjun; Lee, Jonghwan; Kim, Ikjune; Kim, Geunho; Seo, Jaeseok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Decommissioning workers need familiarization with working environments because working environment is under high radioactivity and work difficulty during decommissioning of nuclear facilities. On-the-job training of decommissioning works could effectively train decommissioning workers but this training approach could consume much costs and poor modifications of scenarios. The efficiency of virtual training system could be much better than that of physical training system. This paper was intended to develop the training system to prevent accidents for decommissioning of nuclear facilities. The requirements for the training system were drawn. The data management modules for the training system were designed. The training system of decommissioning workers was developed on the basis of virtual reality which is flexibly modified. The visualization and measurement in the training system were real-time done according as changes of the decommissioning scenario. It can be concluded that this training system enables the subject to improve his familiarization about working environments and to prevent accidents during decommissioning of nuclear facilities.

  15. Error detection and prevention in Embedded Systems Software

    DEFF Research Database (Denmark)

    Kamel, Hani Fouad

    1996-01-01

    Despite many efforts to structure the development and design processes of embedded systems, errors are discovered at the final stages of production and sometimes after the delivery of the products. The cost of such errors can be prohibitive.Different design techniques to detect such errors...... systems, a formal model for such systems is introduced. The main characteristics of embedded systems design and the interaction of these properties are described. A taxonomy for the structure of the software developed for such systems based on the amount of processes and processors involved is presented.......The second part includes methods and techniques to detect software design errors.The third part deals with error prevention. It starts with a presentation of different models of the development processes used in industry and taught at universities. This leads us to deduce the major causes of errors...

  16. Fall Prediction and Prevention Systems: Recent Trends, Challenges, and Future Research Directions

    Directory of Open Access Journals (Sweden)

    Ramesh Rajagopalan

    2017-11-01

    Full Text Available Fall prediction is a multifaceted problem that involves complex interactions between physiological, behavioral, and environmental factors. Existing fall detection and prediction systems mainly focus on physiological factors such as gait, vision, and cognition, and do not address the multifactorial nature of falls. In addition, these systems lack efficient user interfaces and feedback for preventing future falls. Recent advances in internet of things (IoT and mobile technologies offer ample opportunities for integrating contextual information about patient behavior and environment along with physiological health data for predicting falls. This article reviews the state-of-the-art in fall detection and prediction systems. It also describes the challenges, limitations, and future directions in the design and implementation of effective fall prediction and prevention systems.

  17. Fall Prediction and Prevention Systems: Recent Trends, Challenges, and Future Research Directions.

    Science.gov (United States)

    Rajagopalan, Ramesh; Litvan, Irene; Jung, Tzyy-Ping

    2017-11-01

    Fall prediction is a multifaceted problem that involves complex interactions between physiological, behavioral, and environmental factors. Existing fall detection and prediction systems mainly focus on physiological factors such as gait, vision, and cognition, and do not address the multifactorial nature of falls. In addition, these systems lack efficient user interfaces and feedback for preventing future falls. Recent advances in internet of things (IoT) and mobile technologies offer ample opportunities for integrating contextual information about patient behavior and environment along with physiological health data for predicting falls. This article reviews the state-of-the-art in fall detection and prediction systems. It also describes the challenges, limitations, and future directions in the design and implementation of effective fall prediction and prevention systems.

  18. Metal allergens of growing significance: epidemiology, immunotoxicology, strategies for testing and prevention.

    Science.gov (United States)

    Forte, Giovanni; Petrucci, Francesco; Bocca, Beatrice

    2008-09-01

    Metal-induced allergic contact dermatitis (ACD) is expressed in a wide range of cutaneous reactions following dermal and systemic exposure to products such as cosmetics and tattoos, detergents, jewellery and piercing, leather tanning, articular prostheses and dental implants. Apart from the well known significance of nickel in developing ACD, other metals such as aluminium, beryllium, chromium, cobalt, copper, gold, iridium, mercury, palladium, platinum, rhodium and titanium represented emerging causes of skin hypersensitivity. Despite the European Union directives that limit the total nickel content in jewellery alloys, the water soluble chromium (VI) in cement, and metals banned in cosmetics, the diffusion of metal-induced ACD remained quite high. On this basis, a review on the epidemiology of metal allergens, the types of exposure, the skin penetration, the immune response, and the protein interaction is motivated. Moreover, in vivo and in vitro tests for the identification and potency of skin-sensitizing metals are here reviewed in a risk assessment framework for the protection of consumer's health. Avenues for ACD prevention and therapy such as observance of maximum allowable metal levels, optimization of metallurgic characteristics, efficacy of chelating agents and personal protection are also discussed.

  19. Early Detection and Prevention of Mental Health Problems: Developmental Epidemiology and Systems of Support.

    Science.gov (United States)

    Costello, E Jane

    2016-01-01

    This article reviews the role of developmental epidemiology in the prevention of child and adolescent mental disorders and the implications for systems of support. The article distinguishes between universal or primary prevention, which operates at the level of the whole community to limit risk exposure before the onset of symptoms, and secondary or targeted prevention, which operates by identifying those at high risk of developing a disorder. It discusses different aspects of time as it relates to risk for onset of disease, such as age at first exposure, duration of exposure, age at onset of first symptoms, and time until treatment. The study compares universal and targeted prevention, describing the systems needed to support each, and their unintended consequences.

  20. SP-100 nuclear assembly test: Test assembly functional requirements and system arrangement

    International Nuclear Information System (INIS)

    Fallas, T.T.; Gluck, R.; Motwani, K.; Clay, H.; O'Neill, G.

    1991-01-01

    This paper describes the functional requirements and the system that will be tested to validate the reactor, flight shield, and flight controller of the SP-100 Generic Flight System (GFS). The Nuclear Assembly Test (NAT) consists of the test article (SP-100 reactor with control devices and the flight shield) and its supporting systems. The NAT test assembly is being designed by GE. Westinghouse Hanford Company (WHC) is designing the test cell and vacuum vessel system that will contain the NAT test assembly (Renkey et al. 1989). Preliminary design reviews have been completed and the final design is under way

  1. [Prevention of systemic lupus erythematosus in children born to mothers treated for this disease].

    Science.gov (United States)

    Kardaszewicz, E; Machalski, M; Woszczyk, D; Woszczyk, M; Harbut-Gryłka, A

    Genetic predisposition and environmental factors (physical, chemical, hormonal and drugs inducing collagen-like syndrome) play an important role in the pathogenesis of the systemic lupus erythematosus. Elimination of these factors from the environment of the genetically predisposed individuals may prevent part of them against the disease. Basing on the above assumption, a chart of prophylaxis has been constructed and distributed among the mothers with the systemic lupus erythematosus, recommending prophylactic measures in both mothers and children. Within 1977-1987, 50 children were examined from time to time. Basic laboratory tests, phenomenon LE, antinuclear antibodies and antibodies anti-DNA have been determined. Transient presence of antinuclear antibodies was seen in 23 children. A tendency to an increase in the antibody titre was observed in girls of this group whereas a decrease in the titre was noted in the boys with the time lapse. Systemic lupus erythematosus prophylaxis in both mothers and children is uncomplicated and favourable for children. Regular determination of antibodies enables early diagnosis of the disease.

  2. The development and testing of a modular containment system under plutonium active conditions

    International Nuclear Information System (INIS)

    Sanders, M.J.; Pengelly, M.G.A.

    1984-05-01

    A Modular Containment System has been designed, constructed and tested under plutonium active conditions at AEE Winfrith. The unit consists of a portable self-contained pressurised suit area, complete with shower entry tunnel and ventilation plant which can be assembled to enclose active plant to enable active operations to be carried out safely by operators dressed in standard pressurised suits. A fundamental feature of the system is the use of strippable coatings which are used to treat the interior surfaces prior to active operations to prevent permanent contamination of the structure. Details of construction are given together with results of trials. Whilst this report describes work with plutonium, the system has clear applications wherever temporary containment of radioactive or toxic materials is needed. (U.K.)

  3. CMIF ECLS system test findings

    Science.gov (United States)

    Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.

    1989-01-01

    During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

  4. High Power Alternator Test Unit (ATU) Electrical System Test

    Science.gov (United States)

    Birchenough, Arthur; Hervol, David

    2007-01-01

    The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, OH was used to simulate the operating conditions and evaluate the performance of the ATU and it s interaction with various LPSF components in accordance with the JIMO AC Power System Requirements. The testing was carried out at the breadboard development level. Results of these tests will be used for the development and validation of analytical models for performance and lifetime prediction.

  5. A system of safety management practices and worker engagement for reducing and preventing accidents: an empirical and theoretical investigation.

    Science.gov (United States)

    Wachter, Jan K; Yorio, Patrick L

    2014-07-01

    The overall research objective was to theoretically and empirically develop the ideas around a system of safety management practices (ten practices were elaborated), to test their relationship with objective safety statistics (such as accident rates), and to explore how these practices work to achieve positive safety results (accident prevention) through worker engagement. Data were collected using safety manager, supervisor and employee surveys designed to assess and link safety management system practices, employee perceptions resulting from existing practices, and safety performance outcomes. Results indicate the following: there is a significant negative relationship between the presence of ten individual safety management practices, as well as the composite of these practices, with accident rates; there is a significant negative relationship between the level of safety-focused worker emotional and cognitive engagement with accident rates; safety management systems and worker engagement levels can be used individually to predict accident rates; safety management systems can be used to predict worker engagement levels; and worker engagement levels act as mediators between the safety management system and safety performance outcomes (such as accident rates). Even though the presence of safety management system practices is linked with incident reduction and may represent a necessary first-step in accident prevention, safety performance may also depend on mediation by safety-focused cognitive and emotional engagement by workers. Thus, when organizations invest in a safety management system approach to reducing/preventing accidents and improving safety performance, they should also be concerned about winning over the minds and hearts of their workers through human performance-based safety management systems designed to promote and enhance worker engagement. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.

  6. Test Telemetry And Command System (TTACS)

    Science.gov (United States)

    Fogel, Alvin J.

    1994-01-01

    The Jet Propulsion Laboratory has developed a multimission Test Telemetry and Command System (TTACS) which provides a multimission telemetry and command data system in a spacecraft test environment. TTACS reuses, in the spacecraft test environment, components of the same data system used for flight operations; no new software is developed for the spacecraft test environment. Additionally, the TTACS is transportable to any spacecraft test site, including the launch site. The TTACS is currently operational in the Galileo spacecraft testbed; it is also being provided to support the Cassini and Mars Surveyor Program projects. Minimal personnel data system training is required in the transition from pre-launch spacecraft test to post-launch flight operations since test personnel are already familiar with the data system's operation. Additionally, data system components, e.g. data display, can be reused to support spacecraft software development; and the same data system components will again be reused during the spacecraft integration and system test phases. TTACS usage also results in early availability of spacecraft data to data system development and, as a result, early data system development feedback to spacecraft system developers. The TTACS consists of a multimission spacecraft support equipment interface and components of the multimission telemetry and command software adapted for a specific project. The TTACS interfaces to the spacecraft, e.g., Command Data System (CDS), support equipment. The TTACS telemetry interface to the CDS support equipment performs serial (RS-422)-to-ethernet conversion at rates between 1 bps and 1 mbps, telemetry data blocking and header generation, guaranteed data transmission to the telemetry data system, and graphical downlink routing summary and control. The TTACS command interface to the CDS support equipment is nominally a command file transferred in non-real-time via ethernet. The CDS support equipment is responsible for

  7. LTCS (Laser Thermal Control System) Test Supporting the Improvement of DeCoM (Deepak Condenser Model)

    Science.gov (United States)

    Patel, Deepak

    2014-01-01

    Thermal and Fluids Analysis Workshop, Cleveland OH. NCTS 19701-14. On Dec 2013 a Loop Heat Pipe (LHP) test was performed as part of the integral Laser Thermal Control System (LTCS). During the balance portion of this testing it was noticed that the LHP was not going to be able to maintain temperature on the operational thermal mass. The test was stopped. After multiple meetings with the LTCS designers, LHP experts (in house and external) it was concluded that gravity was preventing the control heaters to maintain control on the reservoir. A heater was installed onto the liquid return line as part of the fix. After implementing the fix on the liquid return line, the test on May 2014 proved that the system works in vertical orientation using the liquid line heater. Through this testing, the correlation of the Deepak Condenser Model (DeCoM) was possible. This paper describes how well DeCoM predicts the condenser behavior in comparison to the test results of LTCS test.

  8. Vitrification Facility integrated system performance testing report

    International Nuclear Information System (INIS)

    Elliott, D.

    1997-01-01

    This report provides a summary of component and system performance testing associated with the Vitrification Facility (VF) following construction turnover. The VF at the West Valley Demonstration Project (WVDP) was designed to convert stored radioactive waste into a stable glass form for eventual disposal in a federal repository. Following an initial Functional and Checkout Testing of Systems (FACTS) Program and subsequent conversion of test stand equipment into the final VF, a testing program was executed to demonstrate successful performance of the components, subsystems, and systems that make up the vitrification process. Systems were started up and brought on line as construction was completed, until integrated system operation could be demonstrated to produce borosilicate glass using nonradioactive waste simulant. Integrated system testing and operation culminated with a successful Operational Readiness Review (ORR) and Department of Energy (DOE) approval to initiate vitrification of high-level waste (HLW) on June 19, 1996. Performance and integrated operational test runs conducted during the test program provided a means for critical examination, observation, and evaluation of the vitrification system. Test data taken for each Test Instruction Procedure (TIP) was used to evaluate component performance against system design and acceptance criteria, while test observations were used to correct, modify, or improve system operation. This process was critical in establishing operating conditions for the entire vitrification process

  9. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  10. National strategy for suicide prevention in Japan: impact of a national fund on progress of developing systems for suicide prevention and implementing initiatives among local authorities.

    Science.gov (United States)

    Nakanishi, Miharu; Yamauchi, Takashi; Takeshima, Tadashi

    2015-01-01

    In Japan, the Cabinet Office released the 'General Principles of Suicide Prevention Policy' in 2007 and suggested nine initiatives. In 2009, a national fund was launched to help prefectures (the administrative divisions of Japan) and local authorities implement five categories of suicide-prevention programs. This paper examines the impact of the national fund on the establishment of the systems for suicide prevention and the implementation of these initiatives among local authorities. The present study included 1385 local authorities (79.5%) from all 47 prefectures that responded to the cross-sectional questionnaire survey. Improved suicide-prevention systems and the implementation of nine initiatives in April 2013 were observed among 265 local authorities (19.1%) that implemented 'Training of community service providers' and 'Public awareness campaigns'; 178 local authorities (12.9%) that implemented 'Face-to-face counseling', 'Training of community service providers' and 'Public awareness campaigns'; and 324 local authorities (23.4%) that implemented 'Trauma-informed policies and practices'. There was no significant difference in suicide-prevention systems and the implementation of nine initiatives between 203 local authorities (14.7%) that implemented only 'Public awareness campaigns' and 231 local authorities (16.7%) that did not implement any suicide-prevention programs. The results of our study suggest that the national fund promoted the establishment of community systems for suicide prevention and helped implement initiatives among local authorities. The national suicide-prevention strategy in Japan should explore a standard package of programs to guide community suicide-prevention efforts with a sustained workforce among local authorities. © 2014 The Authors. Psychiatry and Clinical Neurosciences © 2014 Japanese Society of Psychiatry and Neurology.

  11. Test plan: Brayton Isotope Power System Ground Demonstration System (BIPS-GDS)

    International Nuclear Information System (INIS)

    1976-01-01

    The purpose of this test plan is to provide an overall outline of all testing to be accomplished on the GDS. Included in this test plan are administrative requirements, instrumentation accuracies, instrumentation, equipment definitions, system test setup, and facility installation. The test program will enable collection of sufficient data to establish material, component, and system design integrity. The data will also be used to establish and evaluate component and system performance and reliability characteristics, verification of proper system component integration prior to initiation of Phase II, and flight system (FS) development

  12. Continuous Improvement in Battery Testing at the NASA/JSC Energy System Test Area

    Science.gov (United States)

    Boyd, William; Cook, Joseph

    2003-01-01

    The Energy Systems Test Area (ESTA) at the Lyndon B. Johnson Space Center in Houston, Texas conducts development and qualification tests to fulfill Energy System Division responsibilities relevant to ASA programs and projects. EST A has historically called upon a variety of fluid, mechanical, electrical, environmental, and data system capabilities spread amongst five full-service facilities to test human and human supported spacecraft in the areas of propulsion systems, fluid systems, pyrotechnics, power generation, and power distribution and control systems. Improvements at ESTA are being made in full earnest of offering NASA project offices an option to choose a thorough test regime that is balanced with cost and schedule constraints. In order to continue testing of enabling power-related technologies utilized by the Energy System Division, an especially proactive effort has been made to increase the cost effectiveness and schedule responsiveness for battery testing. This paper describes the continuous improvement in battery testing at the Energy Systems Test Area being made through consolidation, streamlining, and standardization.

  13. Understanding a successful obesity prevention initiative in children under 5 from a systems perspective.

    Science.gov (United States)

    Owen, Brynle; Brown, Andrew D; Kuhlberg, Jill; Millar, Lynne; Nichols, Melanie; Economos, Christina; Allender, Steven

    2018-01-01

    Systems thinking represents an innovative and logical approach to understanding complexity in community-based obesity prevention interventions. We report on an approach to apply systems thinking to understand the complexity of a successful obesity prevention intervention in early childhood (children aged up to 5 years) conducted in a regional city in Victoria, Australia. A causal loop diagram (CLD) was developed to represent system elements related to a successful childhood obesity prevention intervention in early childhood. Key stakeholder interviews (n = 16) were examined retrospectively to generate purposive text data, create microstructures, and form a CLD. A CLD representing key stakeholder perceptions of a successful intervention comprised six key feedback loops explaining changes in project implementation over time. The loops described the dynamics of collaboration, network formation, community awareness, human resources, project clarity, and innovation. The CLD developed provides a replicable means to capture, evaluate and disseminate a description of the dynamic elements of a successful obesity prevention intervention in early childhood.

  14. Testing Infrastructure for Operating System Kernel Development

    DEFF Research Database (Denmark)

    Walter, Maxwell; Karlsson, Sven

    2014-01-01

    Testing is an important part of system development, and to test effectively we require knowledge of the internal state of the system under test. Testing an operating system kernel is a challenge as it is the operating system that typically provides access to this internal state information. Multi......-core kernels pose an even greater challenge due to concurrency and their shared kernel state. In this paper, we present a testing framework that addresses these challenges by running the operating system in a virtual machine, and using virtual machine introspection to both communicate with the kernel...... and obtain information about the system. We have also developed an in-kernel testing API that we can use to develop a suite of unit tests in the kernel. We are using our framework for for the development of our own multi-core research kernel....

  15. Development of Final Running Test System for Digital Systems

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang-Dae; Lee, Eui-Jong; Lim, Hee-Taek; Kim, Min-Seok [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    In nuclear industry, the newly designed systems to upgrade are qualified to meet IEEE standards and the regulatory guidelines for their functions, performance and reliability requirements. Failure Mode and Effect Analysis, Fault Tree Analysis, and Hazard Analysis have been used to improve the reliability of the control system. To ensure the completeness of the software, the verification and validation processes are carried out during the development process. In spite of the many efforts depending on the analysis and procedures, there are limitations to improve the reliability. The lessons learned from the currently installed system failures show the incompleteness of the final integration test. The current point-to-point and logic-to-logic separate test procedures manually performed by the engineers can cause some procedures missed and have effects on the critical functions. The design processes of the digital systems are met in accordance with the international standards and regulatory guidelines. The lessons learned from the failures of the running digital systems showed the limitations of the current verification and validation efforts. The various improvements and attempts have been considered including the expert review processes and the completeness of the test. In this paper, the Final Running Test Method evaluating the completeness of the digital system using the control patterns and the Test System Architecture are proposed.

  16. Development of Final Running Test System for Digital Systems

    International Nuclear Information System (INIS)

    Lee, Kwang-Dae; Lee, Eui-Jong; Lim, Hee-Taek; Kim, Min-Seok

    2016-01-01

    In nuclear industry, the newly designed systems to upgrade are qualified to meet IEEE standards and the regulatory guidelines for their functions, performance and reliability requirements. Failure Mode and Effect Analysis, Fault Tree Analysis, and Hazard Analysis have been used to improve the reliability of the control system. To ensure the completeness of the software, the verification and validation processes are carried out during the development process. In spite of the many efforts depending on the analysis and procedures, there are limitations to improve the reliability. The lessons learned from the currently installed system failures show the incompleteness of the final integration test. The current point-to-point and logic-to-logic separate test procedures manually performed by the engineers can cause some procedures missed and have effects on the critical functions. The design processes of the digital systems are met in accordance with the international standards and regulatory guidelines. The lessons learned from the failures of the running digital systems showed the limitations of the current verification and validation efforts. The various improvements and attempts have been considered including the expert review processes and the completeness of the test. In this paper, the Final Running Test Method evaluating the completeness of the digital system using the control patterns and the Test System Architecture are proposed

  17. A/T test system for production line; Seisan line yo A/T test system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-10

    This paper introduces an A/T test system for production line made by Meidensha, Inc. Rates and technology of mounting auto-transmissions (A/T) in recent automobiles are improving year after year. A/T production line testers were fabricated and supplied, including those for European countries. This system has the following features: the system employs low inertia AC motor, and is capable of performing tests in close conditions to actual cars; an insulated gate bipolar transistor (IGBT) inverter was employed to achieve control accuracy improvement and noise reduction; high-velocity transient measurement is possible by using a computer system based on the WindowsNT; a solenoid current slant control was employed to respond to electronically controlled A/T; and noise and vibration shift feeling instrumentation can also be used on option. Number of supply is four sets of front engine/front wheel drive (FF) car A/T testers for overseas countries, and two sets of FF A/T tests for use in Japan. (NEDO)

  18. Pilot Testing HIV Prevention in an Afro Caribbean Faith-Based Community.

    Science.gov (United States)

    Archibald, Cynthia M; Newman, David

    2015-01-01

    This research attempted to test an HIV prevention intervention for Afro-Caribbean female teens. The purpose was to improve knowledge and attitudes concerning HIV/AIDS, improve mother-daughter sexual communication, and to reduce risky sexual behaviors. Using a community-based approach, sixty mother and daughter pairs were randomly assigned. One condition was experimental using the Making Proud Choices Caribbean Style (MPCCS); another was a comparison of General Health Education. Independent t-tests were used for analysis between the pretest, posttest and 90 days posttests. MPCCS indicated clear usage with other Caribbean teens. This study helped to support the theory when Afro-Caribbean (AC) teens feel they need to become sexually active (subjective norm), and have referent support (parental support), they may blend values, knowledge, and skills (control beliefs), and are likely to make proud choices to reduce risky sexual behavior in minimizing HIV in their communities.

  19. 21 CFR 862.3610 - Methamphetamine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Methamphetamine test system. 862.3610 Section 862....3610 Methamphetamine test system. (a) Identification. A methamphetamine test system is a device intended to measure methamphetamine, a central nervous system stimulating drug, in serum, plasma, and urine...

  20. A Red-Light Running Prevention System Based on Artificial Neural Network and Vehicle Trajectory Data

    Directory of Open Access Journals (Sweden)

    Pengfei Li

    2014-01-01

    Full Text Available The high frequency of red-light running and complex driving behaviors at the yellow onset at intersections cannot be explained solely by the dilemma zone and vehicle kinematics. In this paper, the author presented a red-light running prevention system which was based on artificial neural networks (ANNs to approximate the complex driver behaviors during yellow and all-red clearance and serve as the basis of an innovative red-light running prevention system. The artificial neural network and vehicle trajectory are applied to identify the potential red-light runners. The ANN training time was also acceptable and its predicting accurate rate was over 80%. Lastly, a prototype red-light running prevention system with the trained ANN model was described. This new system can be directly retrofitted into the existing traffic signal systems.

  1. A red-light running prevention system based on artificial neural network and vehicle trajectory data.

    Science.gov (United States)

    Li, Pengfei; Li, Yan; Guo, Xiucheng

    2014-01-01

    The high frequency of red-light running and complex driving behaviors at the yellow onset at intersections cannot be explained solely by the dilemma zone and vehicle kinematics. In this paper, the author presented a red-light running prevention system which was based on artificial neural networks (ANNs) to approximate the complex driver behaviors during yellow and all-red clearance and serve as the basis of an innovative red-light running prevention system. The artificial neural network and vehicle trajectory are applied to identify the potential red-light runners. The ANN training time was also acceptable and its predicting accurate rate was over 80%. Lastly, a prototype red-light running prevention system with the trained ANN model was described. This new system can be directly retrofitted into the existing traffic signal systems.

  2. A Red-Light Running Prevention System Based on Artificial Neural Network and Vehicle Trajectory Data

    Science.gov (United States)

    Li, Pengfei; Li, Yan; Guo, Xiucheng

    2014-01-01

    The high frequency of red-light running and complex driving behaviors at the yellow onset at intersections cannot be explained solely by the dilemma zone and vehicle kinematics. In this paper, the author presented a red-light running prevention system which was based on artificial neural networks (ANNs) to approximate the complex driver behaviors during yellow and all-red clearance and serve as the basis of an innovative red-light running prevention system. The artificial neural network and vehicle trajectory are applied to identify the potential red-light runners. The ANN training time was also acceptable and its predicting accurate rate was over 80%. Lastly, a prototype red-light running prevention system with the trained ANN model was described. This new system can be directly retrofitted into the existing traffic signal systems. PMID:25435870

  3. Launch Control System Software Development System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This system requires high quality testing that will measure and test the capabilities of the system. For the past two years, the Exploration and Operations Division at Kennedy Space Center (KSC) has assigned a group including interns and full-time engineers to develop automated tests to save the project time and money. The team worked on automating the testing process for the SCCS GUI that would use streamed simulated data from the testing servers to produce data, plots, statuses, etc. to the GUI. The software used to develop automated tests included an automated testing framework and an automation library. The automated testing framework has a tabular-style syntax, which means the functionality of a line of code must have the appropriate number of tabs for the line to function as intended. The header section contains either paths to custom resources or the names of libraries being used. The automation library contains functionality to automate anything that appears on a desired screen with the use of image recognition software to detect and control GUI components. The data section contains any data values strictly created for the current testing file. The body section holds the tests that are being run. The function section can include any number of functions that may be used by the current testing file or any other file that resources it. The resources and body section are required for all test files; the data and function sections can be left empty if the data values and functions being used are from a resourced library or another file. To help equip the automation team with better tools, the Project Lead of the Automated Testing Team, Jason Kapusta, assigned the task to install and train an optical character recognition (OCR

  4. Intrusion Prevention System Based on the Aççess Control Mechanism in the Operating System Miçrosoft Windows

    Directory of Open Access Journals (Sweden)

    V. S. Matveeva

    2012-03-01

    Full Text Available It is suggested to implement an intrusion prevention system based on the access control mechanism of Microsoft Windows operating system to restrict the execution of malicious code. Most of the existing computer security facilities use behavioral and heuristic analyses based on an undocumented method of system calls interception that is not an uniform approach in designing of proactive security mechanism. The IPS is portable among different versions of the OS because it is implemented with documented functions only, it does not need to be updated and uses less system resources in comparison with another protection systems. The system protects from zero-day malware and therefore prevents companies from online-banking fraud that is a very actual problem of information security nowadays.

  5. The interactive systems framework applied to the strategic prevention framework: the Rhode Island experience.

    Science.gov (United States)

    Florin, Paul; Friend, Karen B; Buka, Stephen; Egan, Crystelle; Barovier, Linda; Amodei, Brenda

    2012-12-01

    The Interactive Systems Framework for Dissemination and Implementation (ISF) was introduced as a heuristic systems level model to help bridge the gap between research and practice (Wandersman et al., in Am J Commun Psychol 41:171-181, 2008). This model describes three interacting systems with distinct functions that (1) distill knowledge to develop innovations; (2) provide supportive training and technical assistance for dissemination to; (3) a prevention delivery system responsible for implementation in the field. The Strategic Prevention Framework (SPF) is a major prevention innovation launched by the Center for Substance Abuse Prevention (CSAP) of the Substance Abuse and Mental Health Services Administration (SAMHSA). The SPF offers a structured, sequential, data-driven approach that explicitly targets environmental conditions in the community and aims for change in substance use and problems at the population level. This paper describes how the ISF was applied to the challenges of implementing the SPF in 14 Rhode Island communities, with a focus on the development of a new Training and Technical Assistance Resources Center to support SPF efforts. More specifically, we (1) describe each of the three ISF interacting systems as they evolved in Rhode Island; (2) articulate the lines of communication between the three systems; and (3) examine selected evaluation data to understand relationships between training and technical assistance and SPF implementation and outcomes.

  6. Experimental fast reactor JOYO MK-III functional test. Primary auxiliary cooling system test

    International Nuclear Information System (INIS)

    Karube, Koji; Akagi, Shinji; Terano, Toshihiro; Onuki, Osamu; Ito, Hideaki; Aoki, Hiroshi; Odo, Toshihiro

    2004-03-01

    This paper describes the results of primary auxiliary cooling system, which were done as a part of JOYO MK-III function test. The aim of the tests was to confirm the operational performance of primary auxiliary EMP and the protection system including siphon breaker of primary auxiliary cooling system. The items of the tests were: (Test No.): (Test item). 1) SKS-117: EMP start up test. 2) SKS-118-1: EMP start up test when pony motor running. 3) SKS-121: Function test of siphon breaker. The results of the tests satisfied the required performance, and demonstrated successful operation of primary auxiliary cooling system. (author)

  7. Repeat HIV Testing at Voluntary Testing and Counseling Centers in Croatia: Successful HIV Prevention or Failure to Modify Risk Behaviors?

    Science.gov (United States)

    Matković Puljić, Vlatka; Kosanović Ličina, Mirjana Lana; Kavić, Marija; Nemeth Blažić, Tatjana

    2014-01-01

    HIV testing plays a critical role in preventing the spread of the virus and identifying infected individuals in need of care. Voluntary counseling and testing centers (VCTs) not only conduct testing but they also provide counseling. Since a proportion of people who test negative for HIV on their previous visit will return for retesting, the frequency of retesting and the characteristics of those who retest may provide insights into the efficacy of testing and counseling strategies. In this cross-sectional, retrospective study of 1,482 VCT clients in Croatia in 2010, 44.3% had been tested for HIV before. The rate of repeat HIV testing is lower in Croatia than in other countries. Men who have sex with men (MSM) clients, those with three or more sexual partners in the last 12 months, consistent condom users with steady partners, and intravenous drug users were more likely to be repeat testers. This finding suggests that clients presenting for repeat HIV testing are those who self-identify as being at a higher risk of infection. Our data showed that testing positive for HIV was not associated with repeat testing. However, the effects of repeat testing on HIV epidemiology needs to be explored. PMID:24705595

  8. BMFT-UPTF densitometer system test report

    International Nuclear Information System (INIS)

    Menkhaus, D.E.

    1985-11-01

    This report documents acceptance test results performed on the five Upper Plenum Test Facility (UPTF) three-beam densitometer systems and spare parts. The five densitometer systems are used on the UPTF four hot legs and broken cold leg to measure average chordal-beam densities. The primary objectives of the tests performed were: to verify all assemblies fit as designed (mechanical fitup); to ensure radiation levels met the criteria (<2.5 mR/h); to verify that design accuracy requirements were met (performance tests); and to verify proper operation of the densitometer systems (functional checks). 15 figs., 11 tabs

  9. System Testing of Desktop and Web Applications

    Science.gov (United States)

    Slack, James M.

    2011-01-01

    We want our students to experience system testing of both desktop and web applications, but the cost of professional system-testing tools is far too high. We evaluate several free tools and find that AutoIt makes an ideal educational system-testing tool. We show several examples of desktop and web testing with AutoIt, starting with simple…

  10. Test software for BESIII MDC electronics system

    International Nuclear Information System (INIS)

    Zhang Hongyu; Sheng Huayi; Zhu Haitao; Ji Xiaolu; Zhao Dongxu

    2006-01-01

    This paper presents the design of Test System Software for BESIII MDC Electronics. Two kinds of test systems, SBS VP7 based and PowerPC based systems, and their corresponding test software are introduced. The software is developed in LabVIEW 7.1 and Microsoft Visual C++ 6.0, some test functions of the software, as well as their user interfaces, are described in detail. The software has been applied in hardware debugging, performance test and long term stability test. (authors)

  11. Systemic and Disease-Specific Risk Factors in Vascular Dementia: Diagnosis and Prevention

    Directory of Open Access Journals (Sweden)

    Efraim Jaul

    2017-10-01

    Full Text Available In order to prevent the onset of vascular dementia (VaD in aging individuals, it is critical to detect clinically relevant vascular and systemic pathophysiological changes to signal the onset of its preceding prodromal stages. Identifying behavioral and neurobiological markers that are highly sensitive to VaD classification vs. other dementias is likely to assist in developing novel preventive treatment strategies that could delay the onset of disruptive psychomotor symptoms, decrease hospitalizations, and increase the quality of life in clinically-high-risk aging individuals. In light of empirical diagnostic and clinical findings associated with VaD pathophysiology, the current investigation will suggest a few clinically-validated biomarker measures of prodromal VaD cognitive impairments that are correlated with vascular symptomology, and VaD endophenotypes in non-demented aging people. In prodromal VaD individuals, distinguishing VaD from other dementias (e.g., Alzheimer's disease could facilitate specific early preventive interventions that significantly delay more severe cognitive deterioration or indirectly suppress the onset of dementia with vascular etiology. Importantly, the authors conclude that primary prevention strategies should examine aging individuals by employing comprehensive geriatric assessment approach, taking into account their medical history, and longitudinally noting their vascular, systemic, cognitive, behavioral, and clinical functional status. Secondary prevention strategies may include monitoring chronic medication as well as promoting programs that facilitate social interaction and every-day activities.

  12. Preoperational test report, primary ventilation system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-04

    This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  13. Preoperational test report, primary ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  14. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  15. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  16. Ship Systems Survivability Test Site

    Data.gov (United States)

    Federal Laboratory Consortium — Area for testing survivability of shipboard systems to include electrical, communications, and fire suppression. Multipurpose test range for supporting gun firing,...

  17. [Medication error management climate and perception for system use according to construction of medication error prevention system].

    Science.gov (United States)

    Kim, Myoung Soo

    2012-08-01

    The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

  18. Internal testing of pipe systems with IRIS inspection system

    International Nuclear Information System (INIS)

    1986-01-01

    The internal piping inspection system IRIS allows inside testing of pipes with an internal diameter of NW 70 as a minimum, and of any horizontal or vertical layout of the piping system. Visual testing is done by means of an integrated CCD video system with high resolution power. Technical data are given and examples of applications, in the German and English language. (DG) [de

  19. Test results of six-month test of two water electrolysis systems

    Science.gov (United States)

    Mills, E. S.; Wells, G. W.

    1972-01-01

    The two water electrolysis systems used in the NASA space station simulation 90-day manned test of a regenerative life support system were refurbished as required and subjected to 26-weeks of testing. The two electrolysis units are both promising systems for oxygen and hydrogen generation and both needed extensive long-term testing to evaluate the performance of the respective cell design and provide guidance for further development. Testing was conducted to evaluate performance in terms of current, pressure, variable oxygen demands, and orbital simulation. An automatic monitoring system was used to record, monitor and printout performance data at one minute, ten minute or one-hour intervals. Performance data is presented for each day of system operation for each module used during the day. Failures are analyzed, remedial action taken to eliminate problems is discussed and recommendations for redesign for future space applications are stated.

  20. System design description for the whole element furnace testing system

    International Nuclear Information System (INIS)

    Ritter, G.A.; Marschman, S.C.; MacFarlan, P.J.; King, D.A.

    1998-05-01

    This document provides a detailed description of the Hanford Spent Nuclear Fuel (SNF) Whole Element Furnace Testing System located in the Postirradiation Testing Laboratory G-Cell (327 Building). Equipment specifications, system schematics, general operating modes, maintenance and calibration requirements, and other supporting information are provided in this document. This system was developed for performing cold vacuum drying and hot vacuum drying testing of whole N-Reactor fuel elements, which were sampled from the 105-K East and K West Basins. The proposed drying processes are intended to allow dry storage of the SNF for long periods of time. The furnace testing system is used to evaluate these processes by simulating drying sequences with a single fuel element and measuring key system parameters such as internal pressures, temperatures, moisture levels, and off-gas composition

  1. Excitation system testing in HPP 'Uvac'

    Directory of Open Access Journals (Sweden)

    Milojčić Nemanja

    2011-01-01

    Full Text Available The excitation system of hydro unit in HPP 'Uvac' and results of testings of excitation system performed for achieving of unit's mathematical model are presented in this paper. Description of excitation system equipment, parameters of regulators and results obtained after testings are presented. The presented results showed that the regulators are properly adjusted and that the excitation system is completely functional and reliable.

  2. The Systems Test Architect: Enabling The Leap From Testable To Tested

    Science.gov (United States)

    2016-09-01

    is and it would require some “fine-tuning.” [w] Mr. Peart finally has a physical architecture, and feels confident that it will meet the desired ...test and evaluation in systems engineering, this thesis examines the concept that test and evaluation, based on its desired early involvement in the...the documented roles of test and evaluation in systems engineering, this thesis examines the concept that test and evaluation, based on its desired

  3. Extended great deluge algorithm for the imperfect preventive maintenance optimization of multi-state systems

    International Nuclear Information System (INIS)

    Nahas, Nabil; Khatab, Abdelhakim; Ait-Kadi, Daoud; Nourelfath, Mustapha

    2008-01-01

    This paper deals with preventive maintenance optimization problem for multi-state systems (MSS). This problem was initially addressed and solved by Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. It consists on finding an optimal sequence of maintenance actions which minimizes maintenance cost while providing the desired system reliability level. This paper proposes an approach which improves the results obtained by genetic algorithm (GENITOR) in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. The considered MSS have a range of performance levels and their reliability is defined to be the ability to meet a given demand. This reliability is evaluated by using the universal generating function technique. An optimization method based on the extended great deluge algorithm is proposed. This method has the advantage over other methods to be simple and requires less effort for its implementation. The developed algorithm is compared to than in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203] by using a reference example and two newly generated examples. This comparison shows that the extended great deluge gives the best solutions (i.e. those with minimal costs) for 8 instances among 10

  4. Closed Ecological Life Support Systems (CELSS) Test Facility

    Science.gov (United States)

    Macelroy, Robert D.

    1992-01-01

    The CELSS Test Facility (CTF) is being developed for installation on Space Station Freedom (SSF) in August 1999. It is designed to conduct experiments that will determine the effects of microgravity on the productivity of higher (crop) plants. The CTF will occupy two standard SSF racks and will accommodate approximately one square meter of growing area and a canopy height of 80 cm. The growth volume will be isolated from the external environment, allowing stringent control of environmental conditions. Temperature, humidity, oxygen, carbon dioxide, and light levels will all be closely controlled to prescribed set points and monitored. This level of environmental control is needed to prevent stress and allow accurate assessment of microgravity effect (10-3 to 10-6 x g). Photosynthetic rates and respiration rates, calculated through continuous recording of gas concentrations, transpiration, and total and edible biomass produced will be measured. Toxic byproducts will be monitored and scrubbed. Transpiration water will be collected within the chamber and recycled into the nutrient solution. A wide variety of crop plants, e.g., wheat, soy beans, lettuce, potatoes, can be accommodated and various nutrient delivery systems and light delivery systems will be available. In the course of its development, the CTF will exploit fully, and contribute importantly, to the state-of-art in closed system technology and plant physiology.

  5. 21 CFR 862.3660 - Phenobarbital test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Phenobarbital test system. 862.3660 Section 862....3660 Phenobarbital test system. (a) Identification. A phenobarbitol test system is a device intended to measure phenobarbital, an antiepileptic and sedative-hypnotic drug, in human specimens. Measurements...

  6. Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.

    Science.gov (United States)

    Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel

    2017-10-01

    This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.

  7. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  8. Programmable, automated transistor test system

    Science.gov (United States)

    Truong, L. V.; Sundburg, G. R.

    1986-01-01

    A programmable, automated transistor test system was built to supply experimental data on new and advanced power semiconductors. The data will be used for analytical models and by engineers in designing space and aircraft electric power systems. A pulsed power technique was used at low duty cycles in a nondestructive test to examine the dynamic switching characteristic curves of power transistors in the 500 to 1000 V, 10 to 100 A range. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software.

  9. Premarital HIV testing in Malaysia: a qualitative exploratory study on the views of major stakeholders involved in HIV prevention.

    Science.gov (United States)

    Barmania, Sima; Aljunid, Syed Mohamed

    2017-05-10

    HIV screening has existed in numerous methods as an important part of HIV prevention efforts over the years. Premarital HIV testing for couples who wish to marry has been implemented in a number of regions, which often operate in a mandatory rather than voluntary basis and is considered a contentious issue, with viewpoints held in favour and against. One such region is Malaysia which has a policy of mandatory premarital HIV testing of prospective Muslim married couples. The purpose of this study is to understand stakeholders' views on premarital HIV testing given the Malaysian Islamic context. 35 in-depth face to face semi-structured interviews were undertaken with key stakeholder groups involved in HIV prevention policy in Malaysia, namely, officials from the Ministry of Health, religious leaders and people living with HIV. Participants were recruited from the Klang Valley area, from July to December 2013, using purposive sampling techniques. Inclusion criteria necessitated that participants were over the age of 18 and provided full consent. Interviews were audiotaped, followed a standardised topic guide, transcribed verbatim and analysed using a framework analysis. Participants identified pre-marital HIV testing as an effective HIV prevention policy implemented in Malaysia and was viewed, for the most part, as a positive initiative across all stakeholders. Religious leaders were supportive of testing as it provides a protective mechanism, in line with the teachings of the Shariah, while Ministry of Health officials considered it a normal part of their HIV prevention screening initiatives. However, there were concerns surrounding issues such as confidentiality, counselling and discrimination surrounding the test described by the PLHIV group. The findings of this study show that among the participants interviewed was strong support for mandatory premarital HIV testing, which could possibly expose the vulnerability to HIV, reluctance to test and other areas in the

  10. Test-driven modeling of embedded systems

    DEFF Research Database (Denmark)

    Munck, Allan; Madsen, Jan

    2015-01-01

    To benefit maximally from model-based systems engineering (MBSE) trustworthy high quality models are required. From the software disciplines it is known that test-driven development (TDD) can significantly increase the quality of the products. Using a test-driven approach with MBSE may have...... a similar positive effect on the quality of the system models and the resulting products and may therefore be desirable. To define a test-driven model-based systems engineering (TD-MBSE) approach, we must define this approach for numerous sub disciplines such as modeling of requirements, use cases...... suggest that our method provides a sound foundation for rapid development of high quality system models....

  11. Outlining a preventive oral health care system for China.

    Science.gov (United States)

    Saekel, Rüdiger

    2015-01-01

    The most recent Chinese health care reform, scheduled to run until 2020, has been underway for a number of years. Oral health care has not been explicitly mentioned in the context of this reform. However, oral health is an integral part of general health and the under-servicing of the Chinese population in the area of dental care is particularly high. The article describes how this problem could be addressed. Based on present scientific knowledge,specifically on evidence-based strategies and long-term empirical experience from Western industrialised countries, as well as findings from Chinese pilot studies, the author outlines a preventive oral health care system tailored specifically to the conditions prevailing in China. He describes the background and rationale for a clearly structured, preventive system and summarises the scientific cornerstones on which this concept is founded. The single steps of this model, that are adapted specifically to China, are presented so as to facilitate a critical discussion on the pros and cons of the approach. The author concludes that, by implementing preventive oral care, China could gradually reduce the under-servicing of great parts of the population with dental care that largely avoids dental disease and preserves teeth at a price that is affordable to both public health and patients. This approach would minimise the danger of starting a cycle of re-restorations, owing to outdated treatment methods. The proposal would both fit in well with and add to the current blueprint for Chinese health care reform.

  12. Programmable automated transistor test system

    International Nuclear Information System (INIS)

    Truong, L.V.; Sundberg, G.R.

    1986-01-01

    The paper describes a programmable automated transistor test system (PATTS) and its utilization to evaluate bipolar transistors and Darlingtons, and such MOSFET and special types as can be accommodated with the PATTS base-drive. An application of a pulsed power technique at low duty cycles in a non-destructive test is used to examine the dynamic switching characteristic curves of power transistors. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software. In addition a library of test data is established on disks, tapes, and hard copies for future reference

  13. Availability of periodically tested systems

    International Nuclear Information System (INIS)

    Signoret, J.P.

    1979-01-01

    There is at the present time a need in accurate models to asess the availability of periodically tested stand-by systems. This paper shows how to improve the well known 'saw-tooth curve' model in order to take into account various reliability parameters. A model is developed to assess the pointwise and the mean availabilities of periodically tested stand-by systems. Exact and approxination formulae are given. In addition, the model developed herein leads to optimize the test interval in order to minimize the mean unavailability. A safety diesel in a nuclear power plant is given as an example

  14. 21 CFR 862.1225 - Creatinine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Creatinine test system. 862.1225 Section 862.1225....1225 Creatinine test system. (a) Identification. A creatinine test system is a device intended to measure creatinine levels in plasma and urine. Creatinine measurements are used in the diagnosis and...

  15. 21 CFR 862.3040 - Alcohol test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Alcohol test system. 862.3040 Section 862.3040 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED....3040 Alcohol test system. (a) Identification. An alcohol test system is a device intented to measure...

  16. 21 CFR 862.1035 - Albumin test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Albumin test system. 862.1035 Section 862.1035....1035 Albumin test system. (a) Identification. An albumin test system is a device intended to measure the albumin concentration in serum and plasma. Albumin measurements are used in the diagnosis and...

  17. Open Architecture Data System for NASA Langley Combined Loads Test System

    Science.gov (United States)

    Lightfoot, Michael C.; Ambur, Damodar R.

    1998-01-01

    The Combined Loads Test System (COLTS) is a new structures test complex that is being developed at NASA Langley Research Center (LaRC) to test large curved panels and cylindrical shell structures. These structural components are representative of aircraft fuselage sections of subsonic and supersonic transport aircraft and cryogenic tank structures of reusable launch vehicles. Test structures are subjected to combined loading conditions that simulate realistic flight load conditions. The facility consists of two pressure-box test machines and one combined loads test machine. Each test machine possesses a unique set of requirements or research data acquisition and real-time data display. Given the complex nature of the mechanical and thermal loads to be applied to the various research test articles, each data system has been designed with connectivity attributes that support both data acquisition and data management functions. This paper addresses the research driven data acquisition requirements for each test machine and demonstrates how an open architecture data system design not only meets those needs but provides robust data sharing between data systems including the various control systems which apply spectra of mechanical and thermal loading profiles.

  18. 21 CFR 862.1210 - Creatine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Creatine test system. 862.1210 Section 862.1210....1210 Creatine test system. (a) Identification. A creatine test system is a device intended to measure creatine (a substance synthesized in the liver and pancreas and found in biological fluids) in plasma...

  19. 21 CFR 862.1065 - Ammonia test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Ammonia test system. 862.1065 Section 862.1065....1065 Ammonia test system. (a) Identification. An ammonia test system is a device intended to measure ammonia levels in blood, serum, and plasma, Ammonia measurements are used in the diagnosis and treatment...

  20. 21 CFR 862.3600 - Mercury test system.

    Science.gov (United States)

    2010-04-01

    ....3600 Mercury test system. (a) Identification. A mercury test system is a device intended to measure mercury, a heavy metal, in human specimens. Measurements obtained by this device are used in the diagnosis... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Mercury test system. 862.3600 Section 862.3600...

  1. Space Launch System Scale Model Acoustic Test Ignition Overpressure Testing

    Science.gov (United States)

    Nance, Donald; Liever, Peter; Nielsen, Tanner

    2015-01-01

    The overpressure phenomenon is a transient fluid dynamic event occurring during rocket propulsion system ignition. This phenomenon results from fluid compression of the accelerating plume gas, subsequent rarefaction, and subsequent propagation from the exhaust trench and duct holes. The high-amplitude unsteady fluid-dynamic perturbations can adversely affect the vehicle and surrounding structure. Commonly known as ignition overpressure (IOP), this is an important design-to environment for the Space Launch System (SLS) that NASA is currently developing. Subscale testing is useful in validating and verifying the IOP environment. This was one of the objectives of the Scale Model Acoustic Test, conducted at Marshall Space Flight Center. The test data quantifies the effectiveness of the SLS IOP suppression system and improves the analytical models used to predict the SLS IOP environments. The reduction and analysis of the data gathered during the SMAT IOP test series requires identification and characterization of multiple dynamic events and scaling of the event waveforms to provide the most accurate comparisons to determine the effectiveness of the IOP suppression systems. The identification and characterization of the overpressure events, the waveform scaling, the computation of the IOP suppression system knockdown factors, and preliminary comparisons to the analytical models are discussed.

  2. Space Launch System Scale Model Acoustic Test Ignition Overpressure Testing

    Science.gov (United States)

    Nance, Donald K.; Liever, Peter A.

    2015-01-01

    The overpressure phenomenon is a transient fluid dynamic event occurring during rocket propulsion system ignition. This phenomenon results from fluid compression of the accelerating plume gas, subsequent rarefaction, and subsequent propagation from the exhaust trench and duct holes. The high-amplitude unsteady fluid-dynamic perturbations can adversely affect the vehicle and surrounding structure. Commonly known as ignition overpressure (IOP), this is an important design-to environment for the Space Launch System (SLS) that NASA is currently developing. Subscale testing is useful in validating and verifying the IOP environment. This was one of the objectives of the Scale Model Acoustic Test (SMAT), conducted at Marshall Space Flight Center (MSFC). The test data quantifies the effectiveness of the SLS IOP suppression system and improves the analytical models used to predict the SLS IOP environments. The reduction and analysis of the data gathered during the SMAT IOP test series requires identification and characterization of multiple dynamic events and scaling of the event waveforms to provide the most accurate comparisons to determine the effectiveness of the IOP suppression systems. The identification and characterization of the overpressure events, the waveform scaling, the computation of the IOP suppression system knockdown factors, and preliminary comparisons to the analytical models are discussed.

  3. 21 CFR 866.5040 - Albumin immunological test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Albumin immunological test system. 866.5040... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunological Test Systems § 866.5040 Albumin immunological test system. (a) Identification. An albumin immunological test system is a device that consists of...

  4. Prevent Cervical Cancer!

    Centers for Disease Control (CDC) Podcasts

    2015-01-08

    Cervical cancer can be prevented. Listen as two friends—one a doctor—talk about screening tests and early detection. Learn what test you might need.  Created: 1/8/2015 by National Center for Chronic Disease Prevention and Health Promotion (NCCDPHP).   Date Released: 1/8/2015.

  5. Frequency modulation system test procedure shuttle task 501 approach and landing test configuration

    Science.gov (United States)

    Doland, G. D.

    1976-01-01

    Shuttle Task 501 is an in-line task to test the performance and compatibility of radiofrequency links between the SSO and ground, and relay via a satellite. Under Shuttle Task 501 approach and landing test (ALT) phase only a limited portion of the communication and tracking (C&T) equipment is to be tested. The principal item to be tested is a frequency modulated (FM) data link. To test this RF link, an ALT FM System was designed, constructed, and the console wiring verified. A step-by-step procedure to be used to perform the ALT FM system is presented. The ALT FM system test is to be performed prior to delivery of the equipment to the Electronic Systems Test Laboratory (ESTL).

  6. Wireless sensor network-based greenhouse environment monitoring and automatic control system for dew condensation prevention.

    Science.gov (United States)

    Park, Dae-Heon; Park, Jang-Woo

    2011-01-01

    Dew condensation on the leaf surface of greenhouse crops can promote diseases caused by fungus and bacteria, affecting the growth of the crops. In this paper, we present a WSN (Wireless Sensor Network)-based automatic monitoring system to prevent dew condensation in a greenhouse environment. The system is composed of sensor nodes for collecting data, base nodes for processing collected data, relay nodes for driving devices for adjusting the environment inside greenhouse and an environment server for data storage and processing. Using the Barenbrug formula for calculating the dew point on the leaves, this system is realized to prevent dew condensation phenomena on the crop's surface acting as an important element for prevention of diseases infections. We also constructed a physical model resembling the typical greenhouse in order to verify the performance of our system with regard to dew condensation control.

  7. Proof-of-Concept Testing of the Passive Cooling System (T-CLIP™) for Solar Thermal Applications at an Elevated Temperature

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seung Jun [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology; Quintana, Donald L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology; Vigil, Gabrielle M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology; Perraglio, Martin Juan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology; Farley, Cory Wayne [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology; Tafoya, Jose I. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology; Martinez, Adam L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Applied Engineering and Technology

    2015-11-30

    The Applied Engineering and Technology-1 group (AET-1) at Los Alamos National Laboratory (LANL) conducted the proof-of-concept tests of SolarSPOT LLC’s solar thermal Temperature- Clipper, or T-CLIP™ under controlled thermal conditions using a thermal conditioning unit (TCU) and a custom made environmental chamber. The passive T-CLIP™ is a plumbing apparatus that attaches to a solar thermal collector to limit working fluid temperature and to prevent overheating, since overheating may lead to various accident scenarios. The goal of the current research was to evaluate the ability of the T-CLIP™ to control the working fluid temperature by using its passive cooling mechanism (i.e. thermosiphon, or natural circulation) in a small-scale solar thermal system. The assembled environmental chamber that is thermally controlled with the TCU allows one to simulate the various possible weather conditions, which the solar system will encounter. The performance of the T-CLIP™ was tested at two different target temperatures: 1) room temperature (70 °F) and 2) an elevated temperature (130 °F). The current test campaign demonstrated that the T-CLIP™ was able to prevent overheating by thermosiphon induced cooling in a small-scale solar thermal system. This is an important safety feature in situations where the pump is turned off due to malfunction or power outages.

  8. 21 CFR 862.3110 - Antimony test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Antimony test system. 862.3110 Section 862.3110 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES CLINICAL CHEMISTRY AND CLINICAL TOXICOLOGY DEVICES Clinical Toxicology Test Systems § 862.3110 Antimony test system. (a) Identification. A...

  9. Top event prevention in complex systems

    International Nuclear Information System (INIS)

    Youngblood, R.W.; Worrell, R.B.

    1995-01-01

    A key step in formulating a regulatory basis for licensing complex and potentially hazardous facilities is identification of a collection of design elements that is necessary and sufficient to achieve the desired level of protection of the public, the workers, and the environment. Here, such a collection of design elements will be called a ''prevention set.'' At the design stage, identifying a prevention set helps to determine what elements to include in the final design. Separately, a prevention-set argument could be used to limit the scope of regulatory oversight to a subset of design elements. This step can be taken during initial review of a design, or later as part of an effort to justify relief from regulatory requirements that are burdensome but provide little risk reduction. This paper presents a systematic approach to the problem of optimally choosing a prevention set

  10. A Physical Protection Systems Test Bed for International Counter-Trafficking System Development

    International Nuclear Information System (INIS)

    Stinson, Brad J.; Kuhn, Michael J.; Donaldson, Terrence L.; Richardson, Dave; Rowe, Nathan C.; Younkin, James R.; Pickett, Chris A.

    2011-01-01

    Physical protection systems have a widespread impact on the nuclear industry in areas such as nuclear safeguards, arms control, and trafficking of illicit goods (e.g., nuclear materials) across international borders around the world. Many challenges must be overcome in design and deployment of foreign border security systems such as lack of infrastructure, extreme environmental conditions, limited knowledge of terrain, insider threats, and occasional cultural resistance. Successful security systems, whether it be a system designed to secure a single facility or a whole border security system, rely on the entire integrated system composed of multiple subsystems. This test bed is composed of many unique sensors and subsystems, including wireless unattended ground sensors, a buried fiber-optic acoustic sensor, a lossy coaxial distributed sensor, wireless links, pan-tilt-zoom cameras, mobile power generation systems, unmanned aerial vehicles, and fiber-optic-fence intrusion detection systems. A Common Operating Picture software architecture is utilized to integrate a number of these subsystems. We are currently performance testing each system for border security and perimeter security applications by examining metrics such as probability of sense and a qualitative understanding of the sensors vulnerability of defeat. The testing process includes different soil conditions for buried sensors (e.g., dry, wet, and frozen) and an array of different tests including walking, running, stealth detection, and vehicle detection. Also, long term sustainability of systems is tested including performance differences due to seasonal variations (e.g. summer versus winter, while raining, in foggy conditions). The capabilities of the test bed are discussed. Performance testing results, both at the individual component level and integrated into a larger system for a specific deployment (in situ), help illustrate the usefulness and need for integrated testing facilities to carry out this

  11. Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  12. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  13. New TA Index-Based Rollover Prevention System for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Xiang Liu

    2015-03-01

    Full Text Available In addition to clean transportation and energy savings, electric vehicles can inherently offer better performance in the field of active safety and dynamic stability control, thanks to the superior fast and accurate control characteristics of electric motors. With the novel wheel status parameter TA for electric vehicles proposed by the authors in an earlier publication, a new TA index (TAI-based rollover prevention method is presented in this paper to improve the driving performance of EVs equipped with in-wheel motors. A three-level electric vehicle control structure is used to analyze the effective control steps for rollover prevention with the newly proposed TAI method. The simulation is conducted using an in-house developed electric vehicle dynamic model. The simulation results prove the feasibility of using TAI to detect rollover. The experiment uses an electric vehicle equipped with four in-wheel motors in the authors’ research lab. The vehicle parameter and performance data are imported to CarSim, which is industrial standard vehicle dynamic analysis software to run the rollover test. The experimental results also demonstrate that TAI is an effective method of rollover prevention.

  14. Waste retrieval sluicing system data acquisition system acceptance test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115

  15. Evolution of a test article handling system for the SP-100 GES test

    International Nuclear Information System (INIS)

    Shen, E.J.; Schweiger, L.J.; Miller, W.C.; Gluck, R.; Davies, S.M.

    1987-01-01

    A simulated space environment test of a flight prototypic SP-100 reactor, control system, and flight shield will be conducted at the Hanford Engineering Development Laboratory (HEDL). The flight prototypic components and the supporting primary heat removal system are collectively known as the nuclear assembly test article (TA). The unique configuration and materials of fabrication for the Test Article require a specialized handling facility to support installation, maintenance, and final disposal operation. The test site operator, working in conjunction with the test article supplier, developed and evaluated several handling concepts resulting in the selection of a reference test article handling system. The development of the reference concept for the handling system is presented

  16. Lightning vulnerability of nuclear explosive test systems at the Nevada Test Site

    International Nuclear Information System (INIS)

    Hasbrouck, R.T.

    1985-01-01

    A task force chartered to evaluate the effects of lightning on nuclear explosives at the Nevada Test Site has made several recommendations intended to provide lightning-invulnerable test device systems. When these recommendations have been implemented, the systems will be tested using full-threat-level simulated lightning

  17. Optimized Heat Pipe Backup Cooling System Tested with a Stirling Convertor

    Science.gov (United States)

    Schwendeman, Carl L.; Tarau, Calin; Schifer, Nicholas A.; Anderson, William G.; Garner, Scott

    2016-01-01

    In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal variable conductance heat pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor by bypassing the heat during stops. In a previous NASA Small Business Innovation Research (SBIR) Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for the Stirling RPS. In 2012, one of these VCHPs was successfully tested at NASA Glenn Research Center with a Stirling convertor as an Advanced Stirling Radioisotope Generator (ASRG) backup cooling system. The prototype; however, was not optimized and did not reflect the final heat rejection path. ACT through further funding has developed a semioptimized prototype with the finalized heat path for testing at Glenn with a Stirling convertor. The semioptimized system features a two-phase radiator and is significantly smaller and lighter than the prior prototype to reflect a higher level of flight readiness. The VCHP is designed to activate and remove heat from the GPHS during stoppage with a small temperature increase from the nominal vapor temperature. This small temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the multilayer insulation (MLI). The VCHP passively allows the Stirling convertor to be turned off multiple times during a mission with potentially unlimited off durations. Having the ability to turn the Stirling off allows for the Stirling to be reset and reduces vibrations on the platform during sensitive measurements or

  18. Cooperative Testing of Uncontrollable Timed Systems

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Li, Shuhao

    2008-01-01

    the SUT against the test purpose as long as the SUT reacts to our moves in a cooperative style. We present an operational framework of cooperative winning strategy generation, test case derivation and execution. The test method is proved to be sound and complete. Preliminary experimental results indicate......Abstract. This paper deals with targeted testing of timed systems with uncontrollable behavior. The testing activity is viewed as a game between the tester and the system under test (SUT) towards a given test purpose. The SUT is modeled as Timed Game Automaton and the test purpose is specified...... in Timed CTL formula. We can employ a timed game solver UPPAAL-TIGA to check if the test purpose is ture w.r.t. the model, and if yes, to generate a winning strategy and use it for black-box conformance testing. Specifically, we show that in case the checking yields a negative result, we can still test...

  19. Water electrolysis system refurbishment and testing

    Science.gov (United States)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  20. An introduction to testing techniques in the Intelsat TDMA/DSI system. II - Satellite system operations guide (SSOG) tests

    Science.gov (United States)

    Colby, R. J.; Parthasarathy, R.; Stimson, A. L.

    1983-12-01

    The test methods and procedures of the Intelsat TDMA/DSI SSOG are summarized. The overall structure of the SSOG is outlined, and the operational procedures to be followed for joining a new terminal to the system and for normal operations are reviewed, with an emphasis on the roles of the IOC and the TDMA reference and monitoring stations. The testing philosophy (based on minimal interruptions) and the star-test method are explained and illustrated with diagrams, and the test procedures are examined, including modem tests, electrical-path-length equalization, RF/IF downchain tests, protocol tests, nontransmitting protocol tests, IF/RF upchain tests, transmitting protocol tests, baseband tests, and orderwire lineups. The fundamental access discipline of the TDMA system is presented in an appendix.

  1. Wireless Sensor Network-Based Greenhouse Environment Monitoring and Automatic Control System for Dew Condensation Prevention

    Science.gov (United States)

    Park, Dae-Heon; Park, Jang-Woo

    2011-01-01

    Dew condensation on the leaf surface of greenhouse crops can promote diseases caused by fungus and bacteria, affecting the growth of the crops. In this paper, we present a WSN (Wireless Sensor Network)-based automatic monitoring system to prevent dew condensation in a greenhouse environment. The system is composed of sensor nodes for collecting data, base nodes for processing collected data, relay nodes for driving devices for adjusting the environment inside greenhouse and an environment server for data storage and processing. Using the Barenbrug formula for calculating the dew point on the leaves, this system is realized to prevent dew condensation phenomena on the crop’s surface acting as an important element for prevention of diseases infections. We also constructed a physical model resembling the typical greenhouse in order to verify the performance of our system with regard to dew condensation control. PMID:22163813

  2. Impact of HIV testing and counseling (HTC) knowledge on HIV prevention practices among traditional birth attendants in Nigeria.

    Science.gov (United States)

    Osuji, Alice; Pharr, Jennifer R; Nwokoro, Uche; Ike, Anulika; Ali, Christiana; Ejiro, Ogheneaga; Osuyali, John; Obiefune, Michael; Fiscella, Kevin; Ezeanolue, Echezona E

    2015-02-10

    Nigeria is second in the world for the number of people with HIV and has a high rate of mother-to-child transmission (MTCT). Over 60% of births in Nigeria occur outside of health care facilities, and because of this, Traditional Birth Attendants (TBAs) play a significant role in maternal and child health. It is important that TBAs be knowledgeable about HIV prevention. The purpose of this study was to determine the impact of HIV testing and counseling (HTC) knowledge on the HIV prevention practices among TBAs in Nigeria. Five hundred TBAs were surveyed. Chi-square and logistic regression were used to assess differences in HIV prevention practices between TBAs with and without HTC knowledge. TBAs with HTC knowledge are significantly more likely to engage in HIV prevention practices than TBAs without HTC. Prevention practices included: wearing gloves during delivery (p births occur outside health care facilities in Nigeria, there will be a need for TBAs. Providing TBAs with HTC training increases HIV prevention practices and can be a key to improve maternal and child health.

  3. Implementation of the Communities That Care Prevention System by Coalitions in the Community Youth Development Study

    Science.gov (United States)

    Arthur, Michael W.; Hawkins, J. David; Brown, Eric C.; Briney, John S.; Oesterle, Sabrina; Abbott, Robert D.

    2010-01-01

    Although advances in prevention science over the past two decades have produced a growing list of tested and effective programs and policies for preventing adolescent delinquency and drug use, widespread dissemination and high-quality implementation of effective programs and policies in communities has not been achieved. The Community Youth…

  4. PFN tool test and calibration system

    International Nuclear Information System (INIS)

    Stephenson, W.A.

    1981-12-01

    A system has been developed for the functional testing and neutron output calibration of the PFN (Prompt Fission Neutron) Uranium Logging Tool. The system was designed primarily for field work and consists of a special vehicle as well as test apparatus. Only the pertinent instrumentation is described. This document will serve as an Instruction and Test Equipment service manual for those involved with calibration of the neutron output of the PFN tool

  5. Addendum to "Population-Based Prevention of Child Maltreatment: The U.S. Triple P System Population Trial".

    Science.gov (United States)

    Prinz, Ronald J; Sanders, Matthew R; Shapiro, Cheri J; Whitaker, Daniel J; Lutzker, John R

    2016-04-01

    A previous article published several years ago (Prinz et al. Prevention Science, 10, 1-12, 2009) described the main results of a place-randomized-design study focused on the prevention of child-maltreatment-related outcomes at a population level through the implementation of a multilevel system of parenting and family support (the Triple P-Positive Parenting Program). The current report, prepared at the encouragement of the journal, provides additional details about procedures, measures, and design-related decisions, presents an additional analysis of the main outcome variables, and poses questions about the study and its implications. We also offer guidance about how the field can move forward to build on this line of research. From the outset, the three designated primary child maltreatment outcomes were county-wide rates for substantiated child maltreatment cases, out-of-home placements, and hospital-treated child maltreatment injuries, derived from independent data sources available through administrative archival records. Baseline equivalence between the two intervention conditions was reaffirmed. The additional analysis, which made use of a 5-year baseline (replacing a 1-year baseline) and ANCOVA, yielded large effect sizes for all three outcomes that converged with those from the original analyses. Overall, the study underscored the potential for community-wide parenting and family support to produce population-level preventive impact on child maltreatment. Issues addressed included (1) the need for replication of population-oriented maltreatment prevention strategies like the one tested in this randomized experiment, (2) the need to demonstrate that a parenting-based population approach to maltreatment prevention can also impact children's adjustment apart from child abuse, and (3) the role of implementation science for achieving greater population reach and maintenance over time.

  6. Automated System Tests High-Power MOSFET's

    Science.gov (United States)

    Huston, Steven W.; Wendt, Isabel O.

    1994-01-01

    Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.

  7. Test Confessions : A Study of Testing Practices for Plug-in Systems

    NARCIS (Netherlands)

    Greiler, M.; Van Deursen, A.; Storey, M.A.

    2011-01-01

    Testing plug-in-based systems is challenging due to complex interactions among many different plug-ins, and variations in version and configuration. The objective of this paper is to increase our understanding of what testers and developers think and do when it comes to testing plug-inbased systems.

  8. Preventing nuclear explosive testing. Submitted to the House of Representatives, Ninety-Ninth Congress, First Session

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    H.J. Resolution 3 banning the testing of nuclear weapons over 150 kilotons seeks to slow the arms race by urging Congress to ratify the 1974 Threshold Test Ban Treaty and the 1976 Peaceful Nuclear Explosions Treaty and urging the President to resume negotiations with the Soviet Union. The House Foreign Affairs Committee report supports the concept after a series of hearings with verification experts and the weapons and intelligence establishments. Verification and weapons reliability were the key issues of concern, but the committee concluded that politics rather than technology prevented a comprehensive test ban. The report also includes the reminder in the minority view that talks were suspended after the Soviet invasion of Afghanistan and that scientists need further testing to make weapons safer and less vulnerable to terrorist action

  9. Orion Ammonia Boiler System Preflight Test Preparations

    Science.gov (United States)

    Levitt, Julia L.

    2017-01-01

    The Environmental Controls and Life Support Systems (ECLSS) branch at Kennedy Space Center (KSC) is currently undergoing preparations for ground testing of the Orion Multi-Purpose Crew Vehicle (MPCV) to prepare its subsystems for EM-1 (Exploration Mission-1). EM-1, Orions second unmanned flight, is a three-week long lunar mission during which the vehicle will complete a 6-day retrograde lunar orbit before returning to Earth. This paper focuses on the work done during the authors 16-week internship with the Mechanical Engineering Branch of KSCs Engineering Directorate. The authors project involved assisting with the preparations for testing the Orion MPCVs ammonia boiler system. The purpose of the ammonia boiler system is to keep the spacecraft sufficiently cool during the reentry portion of its mission, from service module (SM) separation to post-landing. This system is critical for keeping both the spacecraft (avionics and electronics) and crew alive during reentry, thus a successful test of the system is essential to the success of EM-1. XXXX The author was able to draft a detailed outline of the procedure for the ammonia system functional test. More work will need to be done on the vehicle power-up and power-down portions of the procedure, but the ammonia system testing portion of the procedure is thorough and includes vehicle test configurations, vehicle commands, and GSE. The author was able to compile a substantial list of questions regarding the ammonia system functional test with the help of her mentors. A significant number of these questions were answered in the teleconferences with Lockheed Martin.

  10. Testing of nuclear air-cleaning systems

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    A standard is presented which describes methods for field-testing nuclear power plant air cleaning systems. Included are specifications for visual inspection; duct and housing leak test; mounting frame pressure leak test; airflow capacity, distribution, and residence time tests; air-aerosol mixing uniformity test; in place leak test of HEPA filter banks; multiple sampling technique; in-place leak test of adsorber stage; laboratory testing of adsorbent; and duct heater performance test

  11. Test and control computer user's guide for a digital beam former test system

    Science.gov (United States)

    Alexovich, Robert E.; Mallasch, Paul G.

    1992-01-01

    A Digital Beam Former Test System was developed to determine the effects of noise, interferers and distortions, and digital implementations of beam forming as applied to the Tracking and Data Relay Satellite 2 (TDRS 2) architectures. The investigation of digital beam forming with application to TDRS 2 architectures, as described in TDRS 2 advanced concept design studies, was conducted by the NASA/Lewis Research Center for NASA/Goddard Space Flight Center. A Test and Control Computer (TCC) was used as the main controlling element of the digital Beam Former Test System. The Test and Control Computer User's Guide for a Digital Beam Former Test System provides an organized description of the Digital Beam Former Test System commands. It is written for users who wish to conduct tests of the Digital Beam forming Test processor using the TCC. The document describes the function, use, and syntax of the TCC commands available to the user while summarizing and demonstrating the use of the commands wtihin DOS batch files.

  12. Basis and Statistical Design of the Passive HIV-1 Antibody Mediated Prevention (AMP) Test-of-Concept Efficacy Trials.

    Science.gov (United States)

    Gilbert, Peter B; Juraska, Michal; deCamp, Allan C; Karuna, Shelly; Edupuganti, Srilatha; Mgodi, Nyaradzo; Donnell, Deborah J; Bentley, Carter; Sista, Nirupama; Andrew, Philip; Isaacs, Abby; Huang, Yunda; Zhang, Lily; Capparelli, Edmund; Kochar, Nidhi; Wang, Jing; Eshleman, Susan H; Mayer, Kenneth H; Magaret, Craig A; Hural, John; Kublin, James G; Gray, Glenda; Montefiori, David C; Gomez, Margarita M; Burns, David N; McElrath, Julie; Ledgerwood, Julie; Graham, Barney S; Mascola, John R; Cohen, Myron; Corey, Lawrence

    2017-01-01

    Anti-HIV-1 broadly neutralizing antibodies (bnAbs) have been developed as potential agents for prevention of HIV-1 infection. The HIV Vaccine Trials Network and the HIV Prevention Trials Network are conducting the Antibody Mediated Prevention (AMP) trials to assess whether, and how, intravenous infusion of the anti-CD4 binding site bnAb, VRC01, prevents HIV-1 infection. These are the first test-of-concept studies to assess HIV-1 bnAb prevention efficacy in humans. The AMP trials are two parallel phase 2b HIV-1 prevention efficacy trials conducted in two cohorts: 2700 HIV-uninfected men and transgender persons who have sex with men in the United States, Peru, Brazil, and Switzerland; and 1500 HIV-uninfected sexually active women in seven countries in sub-Saharan Africa. Participants are randomized 1:1:1 to receive an intravenous infusion of 10 mg/kg VRC01, 30 mg/kg VRC01, or a control preparation every 8 weeks for a total of 10 infusions. Each trial is designed (1) to assess overall prevention efficacy (PE) pooled over the two VRC01 dose groups vs. control and (2) to assess VRC01 dose and laboratory markers as correlates of protection (CoPs) against overall and genotype- and phenotype-specific infection. Each AMP trial is designed to have 90% power to detect PE > 0% if PE is ≥ 60%. The AMP trials are also designed to identify VRC01 properties (i.e., concentration and effector functions) that correlate with protection and to provide insight into mechanistic CoPs. CoPs are assessed using data from breakthrough HIV-1 infections, including genetic sequences and sensitivities to VRC01-mediated neutralization and Fc effector functions. The AMP trials test whether VRC01 can prevent HIV-1 infection in two study populations. If affirmative, they will provide information for estimating the optimal dosage of VRC01 (or subsequent derivatives) and identify threshold levels of neutralization and Fc effector functions associated with high-level protection, setting a benchmark

  13. Preoperational test report, recirculation ventilation systems

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-11

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  14. Preoperational test report, recirculation ventilation systems

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  15. 21 CFR 862.1710 - Total triiodothyronine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Total triiodothyronine test system. 862.1710... Systems § 862.1710 Total triiodothyronine test system. (a) Identification. A total triiodothyronine test system is a device intended to measure the hormone triiodothyronine in serum and plasma. Measurements...

  16. Spaceport Command and Control System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  17. Spaceport Command and Control System Automated Testing

    Science.gov (United States)

    Stein, Meriel

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  18. Automatic test system of the photomultipliers

    International Nuclear Information System (INIS)

    Shiino, Kazuo; Kono, Koji; Ishii, Takanobu; Kasai, Seiji; Yamada, Sakue; Kitamura, Shoichi.

    1990-03-01

    A test system of R580 photomultipliers (PMTs) was constructed for the ZEUS experiment HERA. In this report, we will describe the general feature of the test system, each component of the setup, the procedure of the measurements, the data analyses and the results of the first 800 PMT measurements. (author)

  19. Performance test results of mock-up test facility of HTTR hydrogen production system

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo

    2004-01-01

    For the purpose to demonstrate effectiveness of high-temperature nuclear heat utilization, Japan Atomic Energy Research Institute has been developing a hydrogen production system and has planned to connect the hydrogen production system to High Temperature Engineering Test Reactor (HTTR). Prior to construction of a HTTR hydrogen production system, a mock-up test facility was constructed to investigate transient behavior of the hydrogen production system and to establish system controllability. The Mock-up test facility with a full-scale reaction tube is an approximately 1/30-scale model of the HTTR hydrogen production system and an electric heater is used as a heat source instead of a reactor. After its construction, a performance test of the test facility was carried out in the same pressure and temperature conditions as those of the HTTR hydrogen production system to investigate its performance such as hydrogen production ability, controllability and so on. It was confirmed that hydrogen was stably produced with a hot helium gas about 120m 3 /h, which satisfy the design value, and thermal disturbance of helium gas during the start-up could be mitigated within the design value by using a steam generator. The mock-up test of the HTTR hydrogen production system using this facility will continue until 2004. (author)

  20. Testing cooperative systems with the MARS simulator

    NARCIS (Netherlands)

    Netten, B.D.; Wedemeijer, H.

    2010-01-01

    The complexity of cooperative systems makes the use of high fidelity simulation essential in the development and testing of cooperative applications and their interactions with other cooperative systems. In SAFESPOT a simulator test bench is setup to test the safety margin applications running on

  1. ELECTROFORCE 3330 TEST SYSTEM

    Data.gov (United States)

    Federal Laboratory Consortium — The Bose Electroforce 3330 is a test system with an axial electromagnetic linear motor, a torsional motor, and an environmental chamber for high and low temperature...

  2. Model-based testing for embedded systems

    CERN Document Server

    Zander, Justyna; Mosterman, Pieter J

    2011-01-01

    What the experts have to say about Model-Based Testing for Embedded Systems: "This book is exactly what is needed at the exact right time in this fast-growing area. From its beginnings over 10 years ago of deriving tests from UML statecharts, model-based testing has matured into a topic with both breadth and depth. Testing embedded systems is a natural application of MBT, and this book hits the nail exactly on the head. Numerous topics are presented clearly, thoroughly, and concisely in this cutting-edge book. The authors are world-class leading experts in this area and teach us well-used

  3. Use of a valve operation test and evaluation system to enhance valve reliability

    International Nuclear Information System (INIS)

    Lowry, D.A.

    1990-01-01

    Power plant owners have emphasized the need for assuring safe, reliable operation of valves. While most valves must simply open or close, the mechanisms involved can be quite complex. Motor operated valves (MOVs) must be properly adjusted to assure operability. Individual operator components determine the performance of the entire MOV. Failure in MOVs could cripple or shut down a unit. Thus, a complete valve program consisting of design reviews, operational testing, and preventive and predictive maintenance activities will enhance an owner's confidence level that his valves win operate as expected. Liberty's Valve Operation Test and Evaluation System (VOTES) accurately measures stein thrust without intruding on valve operation. Since mounting a strain gage to a valve stem is a desirable but impractical way of obtaining precise stem thrust, Liberty developed a method to obtain identical data by placing a strain gage sensor on the valve yoke. VOTES provides information which effectively eliminates costly, unscheduled downtime. This paper presents the results of infield VOTES testing. The system's proven ability to identify and characterize actuator and valve performance is demonstrated. Specific topics of discussion include the ability of VOTES to ease a utility's IE Bulletin 8543 concerns and conclusively diagnose MOV components. Data from static and differential pressure testing are presented. Technical, operational, and financial advantages resulting from VOTES technology are explored in detail

  4. 21 CFR 862.1670 - Sorbitol dehydrogenase test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Sorbitol dehydrogenase test system. 862.1670... Systems § 862.1670 Sorbitol dehydrogenase test system. (a) Identification. A sorbitol dehydrogenase test system is a device intended to measure the activity of the enzyme sorbitol dehydrogenase in serum...

  5. 21 CFR 862.1630 - Protein (fractionation) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Protein (fractionation) test system. 862.1630... Systems § 862.1630 Protein (fractionation) test system. (a) Identification. A protein (fractionation) test system is a device intended to measure protein fractions in blood, urine, cerebrospinal fluid, and other...

  6. Information System Model as a Mobbing Prevention: A Case Study

    Directory of Open Access Journals (Sweden)

    Ersin Karaman

    2014-06-01

    Full Text Available In this study, it is aimed to detect mobbing issues in Atatürk University, Economics and Administrative Science Facultyand provide an information system model to prevent mobbing and reduce the risk. The study consists of two parts;i detect mobbing situation via questionnaire and ii design an information system based on the findings of the first part. The questionnaire was applied to research assistants in the faculty. Five factors were analyzed and it is concluded that research assistants have not been exposed to mobbing except the fact that they have mobbing perception about task assignment process. Results show that task operational difficulty, task time and task period are the common mobbing issues.  In order to develop an information system to cope with these issues,   assignment of exam proctor process is addressed. Exam time, instructor location, classroom location and exam duration are the considered as decision variables to developed linear programming (LP model. Coefficients of these variables and constraints about the LP model are specified in accordance with the findings. It is recommended that research assistants entrusting process should be conducted by using this method to prevent and reduce the risk of mobbing perception in the organization.

  7. Model-Driven Test Generation of Distributed Systems

    Science.gov (United States)

    Easwaran, Arvind; Hall, Brendan; Schweiker, Kevin

    2012-01-01

    This report describes a novel test generation technique for distributed systems. Utilizing formal models and formal verification tools, spe cifically the Symbolic Analysis Laboratory (SAL) tool-suite from SRI, we present techniques to generate concurrent test vectors for distrib uted systems. These are initially explored within an informal test validation context and later extended to achieve full MC/DC coverage of the TTEthernet protocol operating within a system-centric context.

  8. Construction of test-bed system of voltage management system to ...

    African Journals Online (AJOL)

    Construction of test-bed system of voltage management system to apply physical power system. ... Journal of Fundamental and Applied Sciences ... system of voltage management system (VMS) in order to apply physical power system.

  9. HIV Risk and Prevention

    Science.gov (United States)

    ... Prevention VIH En Español Get Tested Find an HIV testing site near you. Enter ZIP code or city Follow HIV/AIDS CDC HIV CDC HIV/AIDS See RSS | ... Email Updates on HIV Syndicated Content Website Feedback HIV Risk and Prevention Recommend on Facebook Tweet Share ...

  10. Electronic surveillance systems in infection prevention: organizational support, program characteristics, and user satisfaction.

    Science.gov (United States)

    Grota, Patti G; Stone, Patricia W; Jordan, Sarah; Pogorzelska, Monika; Larson, Elaine

    2010-09-01

    The use of electronic surveillance systems (ESSs) is gradually increasing in infection prevention and control programs. Little is known about the characteristics of hospitals that have a ESS, user satisfaction with ESSs, and organizational support for implementation of ESSs. A total of 350 acute care hospitals in California were invited to participate in a Web-based survey; 207 hospitals (59%) agreed to participate. The survey included a description of infection prevention and control department staff, where and how they spent their time, a measure of organizational support for infection prevention and control, and reported experience with ESSs. Only 23% (44/192) of responding infection prevention and control departments had an ESS. No statistically significant difference was seen in how and where infection preventionists (IPs) who used an ESS and those who did not spend their time. The 2 significant predictors of whether an ESS was present were score on the Organizational Support Scale (odds ratio [OR], 1.10; 95% confidence interval [CI], 1.02-1.18) and hospital bed size (OR, 1.004; 95% CI, 1.00-1.007). Organizational support also was positively correlated with IP satisfaction with the ESS, as measured on the Computer Usability Scale (P = .02). Despite evidence that such systems may improve efficiency of data collection and potentially improve patient outcomes, ESSs remain relatively uncommon in infection prevention and control programs. Based on our findings, organizational support appears to be a major predictor of the presence, use, and satisfaction with ESSs in infection prevention and control programs.

  11. Electronic surveillance systems in infection prevention: Organizational support, program characteristics, and user satisfaction

    Science.gov (United States)

    Grota, Patti G.; Stone, Patricia W.; Jordan, Sarah; Pogorzelska, Monika; Larson, Elaine

    2012-01-01

    Background The use of electronic surveillance systems (ESSs) is gradually increasing in infection prevention and control programs. Little is known about the characteristics of hospitals that have a ESS, user satisfaction with ESSs, and organizational support for implementation of ESSs. Methods A total of 350 acute care hospitals in California were invited to participate in a Web-based survey; 207 hospitals (59%) agreed to participate. The survey included a description of infection prevention and control department staff, where and how they spent their time, a measure of organizational support for infection prevention and control, and reported experience with ESSs. Results Only 23% (44/192) of responding infection prevention and control departments had an ESS. No statistically significant difference was seen in how and where infection preventionists (IPs) who used an ESS and those who did not spend their time. The 2 significant predictors of whether an ESS was present were score on the Organizational Support Scale (odds ratio [OR], 1.10; 95% confidence interval [CI], 1.02-1.18) and hospital bed size (OR, 1.004; 95% CI, 1.00-1.007). Organizational support also was positively correlated with IP satisfaction with the ESS, as measured on the Computer Usability Scale (P = .02). Conclusion Despite evidence that such systems may improve efficiency of data collection and potentially improve patient outcomes, ESSs remain relatively uncommon in infection prevention and control programs. Based on our findings, organizational support appears to be a major predictor of the presence, use, and satisfaction with ESSs in infection prevention and control programs. PMID:20176411

  12. Preoperational test report, raw water system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-10-29

    This represents the preoperational test report for the Raw Water System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system supplies makeup water to the W-030 recirculation evaporative cooling towers for tanks AY1O1, AY102, AZ1O1, AZ102. The Raw Water pipe riser and associated strainer and valving is located in the W-030 diesel generator building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  13. Preoperational test report, raw water system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents the preoperational test report for the Raw Water System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system supplies makeup water to the W-030 recirculation evaporative cooling towers for tanks AY1O1, AY102, AZ1O1, AZ102. The Raw Water pipe riser and associated strainer and valving is located in the W-030 diesel generator building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  14. The Transrapid test facility between system development and system application

    Energy Technology Data Exchange (ETDEWEB)

    Baur, L [MVP GmbH, Muenchen (Germany)

    1996-12-31

    In the development of a new rail technology, such as the magnetic levitation, there is - in contrast to the further development of the railway technology - not the possibility to use existing routes for the technical verification of the system technology until the application. Instead of this there are two possibilities: Cost-effective preliminary development on test beds and small test facilities up to a development stage which justifies the (relatively serious) risk of realising a service route early and to conclude the system trials and verification there; cost-intensive construction of a large-scale test facility which permits an application-related verification of all important system functions and thus creates the technical pre-requisites for a low-risk system application; The presentation deals with the technical requirements of the system at the test facility the challenges and chances linked to its realisation and adjustment to the rapidly progressing state-of-the-art and which this way opens up for a minimisation of the technical application risk. (orig./HW)

  15. Cyber-Physical Energy Systems Modeling, Test Specification, and Co-Simulation Based Testing

    DEFF Research Database (Denmark)

    van der Meer, A. A.; Palensky, P.; Heussen, Kai

    2017-01-01

    The gradual deployment of intelligent and coordinated devices in the electrical power system needs careful investigation of the interactions between the various domains involved. Especially due to the coupling between ICT and power systems a holistic approach for testing and validating is required....... Taking existing (quasi-) standardised smart grid system and test specification methods as a starting point, we are developing a holistic testing and validation approach that allows a very flexible way of assessing the system level aspects by various types of experiments (including virtual, real......, and mixed lab settings). This paper describes the formal holistic test case specification method and applies it to a particular co-simulation experimental setup. The various building blocks of such a simulation (i.e., FMI, mosaik, domain-specific simulation federates) are covered in more detail...

  16. Test facility for auxiliary cooling system (ACS) of fast breeder reactor for Power Reactor and Nuclear Fuel Development Corporation (PNC)

    International Nuclear Information System (INIS)

    1983-01-01

    In preparation of constructing ''Monju'', a prototype fast breeder reactor, PNC has been pushing forward its research and development projects and the ACS was constructed under these projects. The auxiliary cooling system is an important engineered safety feature, and is used for safe removal of heat from the reactor at the shutdown. The ACS serves as a means of testing and assessing the auxiliary cooling system for the ''Monju'' and is designed and manufactured to have one fifth capacity of the Monju. The air heat exchanger and the ACS system was designed to withstand higher temperature range of the conventional design code (MITI-501), and finned tubes were applied for effective heat removal. Preheating system was designed to heat up the whole system over 200 0 C within 20 hours to prevent sodium from freezing. Basic performance of ACS was verified satisfactorily by a series of performance tests, such as start up test, flow rate measurement and preheating test before delivery. The experience from designing and construction of ACS and data obtained by these tests will be very instructive for designing and construction of the ''Monju''. (author)

  17. Status report - The Canadian Hospitals Injury Reporting and Prevention Program: a dynamic and innovative injury surveillance system

    Directory of Open Access Journals (Sweden)

    J. Crain

    2016-06-01

    Full Text Available This status report on the Canadian Hospitals Injury Reporting and Prevention Program (CHIRPP, an emergency department-based injury and poisoning surveillance system, describes the result of migrating from a centralized data entry and coding process to a decentralized process, the web-based eCHIRPP system, in 2011. This secure system is improving the CHIRPP’s overall flexibility and timeliness, which are key attributes of an effective surveillance system. The integrated eCHIRPP platform enables near real-time data entry and access, has user-friendly data management and analysis tools, and allows for easier communication and connectivity across the CHIRPP network through an online collaboration centre. Current pilot testing of automated data monitoring and trend analysis tools—designed to monitor and flag incoming data according to predefined criteria (for example, a new consumer product—is revealing eCHIRPP’s potential for providing early warnings of new hazards, issues and trends.

  18. Virtualization of System of Systems Test and Evaluation

    Science.gov (United States)

    2012-06-04

    computers and is the primary enabler for virtualization. 2. Virtualization System Elements Parmalee, Peterson , Tillman, & Hatfield (1972) outlined the...The work of Abu-Taieh and El Sheikh, based on the work of Balci (1994, 1995), and Balci et al. ( 1996 ), seeks to organize types of tests and to...and testing. In A. Dasso & A. Funes (Eds.), Verification, validation, and testing in software engineering (pp. 155–184). Hershey , PA: Idea Group

  19. Heat removal performance of auxiliary cooling system for the high temperature engineering test reactor during scrams

    International Nuclear Information System (INIS)

    Takeda, Takeshi; Tachibana, Yukio; Iyoku, Tatsuo; Takenaka, Satsuki

    2003-01-01

    The auxiliary cooling system of the high temperature engineering test reactor (HTTR) is employed for heat removal as an engineered safety feature when the reactor scrams in an accident when forced circulation can cool the core. The HTTR is the first high temperature gas-cooled reactor in Japan with reactor outlet gas temperature of 950 degree sign C and thermal power of 30 MW. The auxiliary cooling system should cool the core continuously avoiding excessive cold shock to core graphite components and water boiling of itself. Simulation tests on manual trip from 9 MW operation and on loss of off-site electric power from 15 MW operation were carried out in the rise-to-power test up to 20 MW of the HTTR. Heat removal characteristics of the auxiliary cooling system were examined by the tests. Empirical correlations of overall heat transfer coefficients were acquired for a helium/water heat exchanger and air cooler for the auxiliary cooling system. Temperatures of fluids in the auxiliary cooling system were predicted on a scram event from 30 MW operation at 950 degree sign C of the reactor outlet coolant temperature. Under the predicted helium condition of the auxiliary cooling system, integrity of fuel blocks among the core graphite components was investigated by stress analysis. Evaluation results showed that overcooling to the core graphite components and boiling of water in the auxiliary cooling system should be prevented where open area condition of louvers in the air cooler is the full open

  20. A cost-benefit analysis of preventative management for zebra and quagga mussels in the Colorado-Big Thompson System

    Science.gov (United States)

    Thomas, Catherine M.

    2010-01-01

    chapter provides background information including a history of the zebra mussel invasion in the U.S. and in the West, and details about the Colorado preventative management program and the Colorado-Big Thompson system. The chapter also includes a literature review of mussel dispersal models and economic studies that address control costs and preventative management for aquatic invasive species. Chapter 2 presents the methodological approach used to analyze the costs and benefits of preventative management in the Colorado-Big Thompson system and provides details of the bioeconomic simulation model used to predict invasion patterns and the net benefits of preventative management. Results of the analysis and sensitivity testing of model parameters are presented in Chapter 3. Chapter 4 provides a summary of the analysis and conclusions. A discussion of the limitations of the model and areas for future research is presented in Chapter 5.

  1. Sims Prototype System 2 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The testing, problems encountered, and the results and conclusions obtained from tests performed on the IBM Prototype System, 2, solar hot water system, at the Marshall Space Flight Center Solar Test Facility was described. System 2 is a liquid, non draining solar energy system for supplying domestic hot water to single residences. The system consists of collectors, storage tank, heat exchanger, pumps and associated plumbing and controls.

  2. Specification and Test of Real-Time Systems

    DEFF Research Database (Denmark)

    Nielsen, Brian

    of the system, and a set of constraint patterns which describes and enforces the timing and synchronization constraints among components. We propose new techniques for automated black box conformance testing of real-time systems against densely timed speci cations. A test generator tool examines a specification......Distributed real-time computer based systems are very complex and intrinsically difficult to specify and implement correctly; in part this is caused by the overwhelming number of possible interactions between system components, but especially by a lack of adequate methods and tools to deal...... of the desired system behavior and generates the necessary test cases. A main problem is to construct a reasonably small test suite that can be executed within allotted resources, while having a high likelihood of detecting unknown errors. Our goal has been to treat the time dimension of this problem thoroughly...

  3. Early prevention of instability - search for optimal grid nodes for applying countermeasures

    DEFF Research Database (Denmark)

    Dmitrova, Evgeniya; Jóhannsson, Hjörtur; Nielsen, Arne Hejde

    2012-01-01

    has on the stability of the given generator is based on sensitivity analysis. The sensitivity of the stability criteria for aperiodic small signal angular stability to the corresponding change in the nodal admittances used to generate a prioritized candidate list over possible nodes for preventive...... counter measures application. The suggested method is tested on an 8 bus test system and IEEE 30 bus test system; the obtained results show that the proposed approach identifies the system nodes having the highest potential for improvement of critical stability margins....

  4. A listening test system for automative audio

    DEFF Research Database (Denmark)

    Bech, Søren; Gulbol, Mehmet-Ali; Martin, Geoff

    2005-01-01

    This paper describes two listening tests that were performed to provide initial validation of an auralisation system (see Part 1) to mimic the acoustics of a car interior. The validation is based on a comparison of results from an in-car listening test and another test using the auralisation system...... and recordings of the stimuli used for the in-car test. The music samples for the test were chosen from a database of various CODEC examples from a previous extensive ITU test to validate the ITU-R BS.1387-1 standard....

  5. Test procedure for boxed waste assay system

    International Nuclear Information System (INIS)

    Wachter, J.

    1994-01-01

    This document, prepared by Los Alamos National Laboratory's NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system's embedded operating and data reduction software

  6. System maintenance test plan for the TWRS controlled baseline database system

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented

  7. Decrease in Prostate Cancer Testing Following the US Preventive Services Task Force (USPSTF) Recommendations.

    Science.gov (United States)

    Li, Jun; Berkowitz, Zahava; Hall, Ingrid J

    2015-01-01

    To assess changes of prostate-specific antigen (PSA) testing following recent US Preventive Services Task Force (USPSTF) prostate cancer screening recommendations using 2005 to 2013 National Health Interview Survey data. We calculated the percentage of PSA testing among men ≥40 years by age group and age-adjusted race for each survey year. Differences between years were assessed with linear contrasts after combining all years' data. The overall percentage of PSA testing was highest in 2008 and decreased significantly in 2013. Compared with 2008, each age group had significantly lower screening percentages in 2013, especially men ≥75 years old (-14.0% points; P testing percentages were highest in 2008 and decreased significantly in 2013. Only white men had a significantly lower percentage in 2013 than in 2010. Significant declines in PSA testing from 2008 to 2013 in men ≥75 years old may reflect the impact of the 2008 USPSTF recommendations. While the cause of the decreases in PSA testing between 2010 and 2013 among men aged 50 to 74 years old and white men is unknown, the decreases may suggest the early effects of the 2012 recommendations. © Copyright 2015 by the American Board of Family Medicine.

  8. Health Promotion and Preventive Contents Performed During Reproduction System Learning; Observation in Senior High School

    Science.gov (United States)

    Yuniarti, E.; Fadilah, M.; Darussyamsu, R.; Nurhayati, N.

    2018-04-01

    The higher numbers of cases around sexual behavioral deviance on adolescence are significantly related to their knowledge level about the health of the reproduction system. Thus, teenagers, especially school-aged, have to receive the complete information which emphasizes on recognize promotion and prevention knowledge. This article aims to describe information about health promotion and prevention, which delivered by the teacher in Senior High School learning process on topic reproduction system. The data gained through focused observation using observation sheet and camera recorder. Further, data analyzed descriptively. The result show promotion and preventive approach have been inadequately presented. There are two reasons. Firstly, the promotion and preventive value are not technically requested in the final assessment. The second, the explanation tend to refer to consequences existed in the term of the social and religious norm rather than a scientific basis. It can be concluded suggestion to promote health reproduction and prevent the risk of health reproduction need to be implemented more practice with a scientific explanation which is included in a specific program for adolescence reproductive health improvement.

  9. Report for slot cutter proof-of-principle test, Buried Waste Containment System project. Revision 1

    International Nuclear Information System (INIS)

    1998-01-01

    Several million cubic feet of hazardous and radioactive waste was buried in shallow pits and trenches within many US Department of Energy (US DOE) sites. The pits and trenches were constructed similarly to municipal landfills with both stacked and random dump waste forms such as barrels and boxes. Many of the hazardous materials in these waste sites are migrating into groundwater systems through plumes and leaching. On-site containment is one of the options being considered for prevention of waste migration. This report describes the results of a proof-of-principle test conducted to demonstrate technology for containing waste. This proof-of-principle test, conducted at the RAHCO International, Inc., facility in the summer of 1997, evaluated equipment techniques for cutting a horizontal slot beneath an existing waste site. The slot would theoretically be used by complementary equipment designed to place a cement barrier under the waste. The technology evaluated consisted of a slot cutting mechanism, muck handling system, thrust system, and instrumentation. Data were gathered and analyzed to evaluate the performance parameters

  10. Report for slot cutter proof-of-principle test, Buried Waste Containment System project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-21

    Several million cubic feet of hazardous and radioactive waste was buried in shallow pits and trenches within many US Department of Energy (US DOE) sites. The pits and trenches were constructed similarly to municipal landfills with both stacked and random dump waste forms such as barrels and boxes. Many of the hazardous materials in these waste sites are migrating into groundwater systems through plumes and leaching. On-site containment is one of the options being considered for prevention of waste migration. This report describes the results of a proof-of-principle test conducted to demonstrate technology for containing waste. This proof-of-principle test, conducted at the RAHCO International, Inc., facility in the summer of 1997, evaluated equipment techniques for cutting a horizontal slot beneath an existing waste site. The slot would theoretically be used by complementary equipment designed to place a cement barrier under the waste. The technology evaluated consisted of a slot cutting mechanism, muck handling system, thrust system, and instrumentation. Data were gathered and analyzed to evaluate the performance parameters.

  11. 40 CFR 792.43 - Test system care facilities.

    Science.gov (United States)

    2010-07-01

    .... (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as... different tests. (b) A testing facility shall have a number of animal rooms or other test system areas... waste and refuse or for safe sanitary storage of waste before removal from the testing facility...

  12. Real-Time Countermeasures Preventing Power System Instability by using PMU data from RTDS simulation

    DEFF Research Database (Denmark)

    Karatas, Bahtiyar Can; Jóhannsson, Hjörtur; Nielsen, Arne Hejde

    2016-01-01

    This paper presents an innovative approach to apply wide-area control actions in real-time and prevent emerging instability. A software platform has been further developed, which utilizes Real Time Digital Simulator (RTDS) technology to prevent scenarios leading to power system instability....... The software platform receives phasor measurement unit (PMU) data at a high repetition rate for full system observability. The PMU data serves as input for methods capable of analyzing the steady state torque balance for each individual generator and to determine available power reserves and possible remedial...

  13. Preoperational test report, vent building ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  14. A study on spatial decision support systems for HIV/AIDS prevention based on COM GIS technology

    Science.gov (United States)

    Yang, Kun; Luo, Huasong; Peng, Shungyun; Xu, Quanli

    2007-06-01

    Based on the deeply analysis of the current status and the existing problems of GIS technology applications in Epidemiology, this paper has proposed the method and process for establishing the spatial decision support systems of AIDS epidemic prevention by integrating the COM GIS, Spatial Database, GPS, Remote Sensing, and Communication technologies, as well as ASP and ActiveX software development technologies. One of the most important issues for constructing the spatial decision support systems of AIDS epidemic prevention is how to integrate the AIDS spreading models with GIS. The capabilities of GIS applications in the AIDS epidemic prevention have been described here in this paper firstly. Then some mature epidemic spreading models have also been discussed for extracting the computation parameters. Furthermore, a technical schema has been proposed for integrating the AIDS spreading models with GIS and relevant geospatial technologies, in which the GIS and model running platforms share a common spatial database and the computing results can be spatially visualized on Desktop or Web GIS clients. Finally, a complete solution for establishing the decision support systems of AIDS epidemic prevention has been offered in this paper based on the model integrating methods and ESRI COM GIS software packages. The general decision support systems are composed of data acquisition sub-systems, network communication sub-systems, model integrating sub-systems, AIDS epidemic information spatial database sub-systems, AIDS epidemic information querying and statistical analysis sub-systems, AIDS epidemic dynamic surveillance sub-systems, AIDS epidemic information spatial analysis and decision support sub-systems, as well as AIDS epidemic information publishing sub-systems based on Web GIS.

  15. Long-Term Durability Test for the Left Ventricular Assist System EVAHEART under the Physiologic Pulsatile Load.

    Science.gov (United States)

    Kitano, Tomoya; Iwasaki, Kiyotaka

    The EVAHEART Left Ventricular Assist System (LVAS) was designed for the long-term support of a patient with severe heart failure. It has an original water lubrication system for seal and bearing and wear on these parts was considered one of its critical failure modes. A durability test focusing on wear was designed herein. We developed a mock loop, which generates a physiologic pulsatile flow and is sufficiently durable for a long-term test. The pulsatile load and the low fluid viscosity enable the creation of a severe condition for the mechanical seal. A total of 18 EVAHEART blood pumps completed 2 years of operation under the pulsatile condition without any failure. It indicated the EVAHEART blood pump had a greater than 90% reliability with a 88% confidence level. The test was continued with six blood pumps and achieved an average of 8.6 years, which was longer than the longest clinical use in Japan. The test result showed that no catastrophic, critical, marginal, or minor failures of the blood pump or their symptoms were observed. The seal performance was maintained after the test. Moreover, the surface roughness did not change, which showed any burn or abnormal wear occurred. The original water lubrication system equipped in EVAHEART LVAS prevent severe wear on the seal and the bearing, and it can be used in the bridge to transplant and destination therapy.

  16. Description of an improvement concept to prevent overpressure containment rupture

    International Nuclear Information System (INIS)

    Covelli, B.

    1985-01-01

    This report summarizes results of experiments and recommendations for design improvements, shown by the example of a standard PWR-type system designed in Western Germany. The design improvements are intended to allow safe handling of the hydrogen problem and prevention of undue pressure built-up in the containment. Dimensions and design data are given of the technical components in order to present a realistic view of the measures to be taken for accident prevention. The measures described have been tested and proved to afford optimal advances with regard to prevention of a hydrogen explosion, by inerting with Halon; controlled venting, by means of an open filtering system with head-end blow-off condenser; after-heat removal, by an appropriately dimensioned blow-off condenser, or by means of an additional external spray cooling system. (orig./HP) [de

  17. Orion Boiler Plate Airdrop Test System

    Science.gov (United States)

    Machin, Ricardo A.; Evans, Carol T.

    2013-01-01

    On the 29th of February 2012 the Orion Capsule Parachute Assembly System (CPAS) project attempted to perform an airdrop test of a boilerplate test article for the second time. The first attempt (Cluster Development Test 2, July 2008) to deliver a similar boilerplate from a C-17 using the Low Velocity Air Drop (LVAD) technique resulted in the programmer parachute failing to properly inflate, the test article failing to achieve the desired test initiation conditions, and the test article a total loss. This paper will pick up where the CDT-2 failure investigation left off, describing the test technique that was adopted, and outline the modeling that was performed to gain confidence that the second attempt would be successful. The second boiler plate test (Cluster Development Test 3-3) was indeed a complete success and has subsequently been repeated several times, allowing the CPAS project to proceed with the full scale system level development testing required to integrate the hardware to the first Entry Flight Test vehicle as well as go into the Critical Design Review with minimum risk and a mature design.

  18. The research and test of microwave preventer web

    International Nuclear Information System (INIS)

    Tao Songlei; Li Weicai; Ye Jian; Hong Tao; Tao Junbing

    2003-01-01

    To deal with the microwave's harm to the organism, a division-layer composed of several kinds of materials is set between the source of microwave and the protected target. By the use of the division-layer, the power density of field intensity of microwave will come up to a safe amount. The article puts forward a new microwave preventer for mobile telephone. Experiments show that the radiation power density nearby human brain can be reduced to 5 μW/cm 2 and below by using mobile telephone microwave preventer, which is in compliance with the state health standard for microwave radiation from the mobile phone

  19. Tritium system test assembly control system cost estimate

    International Nuclear Information System (INIS)

    Stutz, R.A.

    1979-01-01

    The principal objectives of the Tritium Systems Test Assembly (TSTA), which includes the development, demonstration and interfacing of technologies related to the deuterium--tritium fuel cycle for fusion reactor systems, are concisely stated. The various integrated subsystems comprising TSTA and their functions are discussed. Each of the four major subdivisions of TSTA, including the main process system, the environmental and safety systems, supporting systems and the physical plant are briefly discussed. An overview of the Master Data Acquisition and Control System, which will control all functional operation of TSTA, is provided

  20. A prototype tap test imaging system: Initial field test results

    Science.gov (United States)

    Peters, J. J.; Barnard, D. J.; Hudelson, N. A.; Simpson, T. S.; Hsu, D. K.

    2000-05-01

    This paper describes a simple, field-worthy tap test imaging system that gives quantitative information about the size, shape, and severity of defects and damages. The system consists of an accelerometer, electronic circuits for conditioning the signal and measuring the impact duration, a laptop PC and data acquisition and processing software. The images are generated manually by tapping on a grid printed on a plastic sheet laid over the part's surface. A mechanized scanner is currently under development. The prototype has produced images for a variety of aircraft composite and metal honeycomb structures containing flaws, damages, and repairs. Images of the local contact stiffness, deduced from the impact duration using a spring model, revealed quantitatively the stiffness reduction due to flaws and damages, as well as the stiffness enhancement due to substructures. The system has been field tested on commercial and military aircraft as well as rotor blades and engine decks on helicopters. Field test results will be shown and the operation of the system will be demonstrated.—This material is based upon work supported by the Federal Aviation Administration under Contract #DTFA03-98-D-00008, Delivery Order No. IA016 and performed at Iowa State University's Center for NDE as part of the Center for Aviation Systems Reliability program.

  1. Tutoring system for nondestructive testing using computer

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jin Koo; Koh, Sung Nam [Joong Ang Inspection Co.,Ltd., Seoul (Korea, Republic of); Shim, Yun Ju; Kim, Min Koo [Dept. of Computer Engineering, Aju University, Suwon (Korea, Republic of)

    1997-10-15

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing.

  2. Tutoring system for nondestructive testing using computer

    International Nuclear Information System (INIS)

    Kim, Jin Koo; Koh, Sung Nam; Shim, Yun Ju; Kim, Min Koo

    1997-01-01

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing.

  3. 21 CFR 862.1715 - Triiodothyronine uptake test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Triiodothyronine uptake test system. 862.1715... Systems § 862.1715 Triiodothyronine uptake test system. (a) Identification. A triiodothyronine uptake test... plasma. Measurements of triiodothyronine uptake are used in the diagnosis and treatment of thyroid...

  4. Prevent Cervical Cancer

    Science.gov (United States)

    ... professional printing [PDF-1.5MB] Cancer Home “Prevent Cervical Cancer” Infographic Language: English Español (Spanish) Recommend on Facebook Tweet Share Compartir Prevent Cervical Cancer with the Right Test at the Right Time ...

  5. Pollution Prevention in Air Force System Acquisition Programs

    Science.gov (United States)

    1994-09-01

    noise requirements, handling radioactive materials, etc. The values should 278 be expressed in terms of indicators that, either quantitatively or...Structure pollhtion prevention ana~lysis Polution Prevention Analysis (PPA)? NEPA w/pollution prevention information - pollution Change prevention...Accumulation Procedures PS 81,04 Waste Jet Fuel Handling and Disposal Safe Practice Instructions (SPI) SPI 104 Radioactive Waste SPI 206 Mercury

  6. Attributes of system testing which promote cost-effectiveness

    International Nuclear Information System (INIS)

    Martin, L.C.

    1975-01-01

    A brief overview of conventional EMP testing activity examines attributes of overall systems tests which promote cost-effectiveness. The general framework represents an EMP-oriented systems test as a portion of a planned program to design, produce, and field system elements. As such, all so-called system tests should play appropriate cost-effective roles in this program, and the objective here is to disclose such roles. The intrinsic worth of such tests depends not only upon placing proper values on the outcomes, but also upon the possible eventual consequences of not doing tests. A relative worth measure is required. Attributes of EMP system testing over the range of potential activity which encompasses research and development, production, field handling, verification, evaluation, and others are reviewed and examined. Thus, the relative worth, in a cost-effective sense, is provided by relating such attributes to the overall program objectives so that values can be placed on the outcomes for tradeoff purposes

  7. Targeting burn prevention in Ukraine: evaluation of base knowledge in burn prevention and first aid treatment.

    Science.gov (United States)

    Gamelli, Liza; Mykychack, Iryna; Kushnir, Antin; Driscoll, Daniel N; Fuzaylov, Gennadiy

    2015-01-01

    Burn prevention has been identified by the World Health Organization (WHO) as a topic in need of further investigation and education throughout the world, with an increased need in low-income countries. It has been noted that implementing educational programs for prevention in high income countries has aided in lowering the rate of burn injuries. The purpose of this study is to evaluate the current education level of knowledge of prevention and first aid treatment of scald burns. A prevention campaign will target these educational needs as a part of an outreach program to improve burn care in Ukraine. The research team evaluated the current health structure in Ukraine and how it could benefit from the increased knowledge of burn prevention and first aid. A test was designed to assess the baseline level of knowledge with regard to first aid and scald prevention in parents, pregnant woman, and healthcare and daycare providers. A total of 14,456 tests were sent to pediatric clinics, obstetrician clinics, and daycare facilities to test respondents. A total of 6,120 completed tests were returned. Doctors presented with the highest level of knowledge averaging 77.0% on prevention and 67.5% on first aid while daycare workers presented the largest gap in knowledge at 65.0% in prevention and 54.3% in first aid. Interest in further educational materials was reported by 92% of respondents. The results of this study clearly show a lack of knowledge in first aid and prevention of scald burn injury in all the populations tested.

  8. 21 CFR 862.3050 - Breath-alcohol test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Breath-alcohol test system. 862.3050 Section 862.3050 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED....3050 Breath-alcohol test system. (a) Identification. A breath-alcohol test system is a device intened...

  9. Automatic Test Systems Aquisition

    National Research Council Canada - National Science Library

    1994-01-01

    We are providing this final memorandum report for your information and use. This report discusses the efforts to achieve commonality in standards among the Military Departments as part of the DoD policy for automatic test systems (ATS...

  10. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  11. Testing Real-Time Systems Using UPPAAL

    DEFF Research Database (Denmark)

    Hessel, Anders; Larsen, Kim Guldstrand; Mikucionis, Marius

    2008-01-01

    This chapter presents principles and techniques for model-based black-box conformance testing of real-time systems using the Uppaal model-checking tool-suite. The basis for testing is given as a network of concurrent timed automata specified by the test engineer. Relativized input...

  12. Beam test with the HIMAC RF control system

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sato, K.; Itano, A.

    1992-01-01

    RF system of the HIMAC synchrotron has been developed and tested in the factory. With the high power system, we could sweep the acceleration frequency from 1MHz to 8MHz with the acceleration voltage of 6KV. The performance of the RF control system has been confirmed with a developed simulator of the synchrotron oscillation. Following these two tests in the factory, we had a beam test of the RF control system at TARN-II in INS (Institute for Nuclear Study, University of Tokyo). This paper describes the beam test and its results. (author)

  13. Stress Testing of Transactional Database Systems

    OpenAIRE

    Meira , Jorge Augusto; Cunha De Almeida , Eduardo; Sunyé , Gerson; Le Traon , Yves; Valduriez , Patrick

    2013-01-01

    International audience; Transactional database management systems (DBMS) have been successful at supporting traditional transaction processing workloads. However, web-based applications that tend to generate huge numbers of concurrent business operations are pushing DBMS performance over their limits, thus threatening overall system availability. Then, a crucial question is how to test DBMS performance under heavy workload conditions. Answering this question requires a testing methodology to ...

  14. Development of autonomous vehicles’ testing system

    Science.gov (United States)

    Ivanov, A. M.; Shadrin, S. S.

    2018-02-01

    This article describes overview of automated and, in perspective, autonomous vehicles’ (AV) implementation risks. Set of activities, actual before the use of AVs on public roads, minimizing negative technical and social problems of AVs’ implementation is presented. Classification of vehicle’s automated control systems operating conditions is formulated. Groups of tests for AVs are developed and justified, sequence of AVs’ testing system formation is proposed.

  15. Simulator testing system (STS)

    International Nuclear Information System (INIS)

    Miller, V.N.

    1990-01-01

    In recent years there has been a greater demand placed on the capabilities and time usage of real-time nuclear plant simulators due to NRC, INPO and utilities requirements. The requirements applied to certification, new simulators, upgrades, modifications, and maintenance of the simulators vary; however, they all require the capabilities of the simulator to be tested whether it is for NRC 10CFR55.45b requirements, ATP testing of new simulators, ATP testing of upgrades with or without panels, adding software/hardware due to plant modifications, or analyzing software/hardware problems on the simulator. This paper describes the Simulator Testing System (STS) which addresses each one of these requirements placed on simulators. Special attention will be given to ATP testing of upgrades without the use of control room panels. The capabilities and applications of the four parts of STS which are the Display Control Software (DCS), Procedure Control Software (PCS), Display Generator Software (DGS) and the Procedure Generator Software (PGS) will be reviewed

  16. Radioactive waste incineration system cold demonstration test

    Energy Technology Data Exchange (ETDEWEB)

    Hozumi, Masahiro; Takaoku, Yoshinobu; Koyama, Shigeru; Nagae, Madoka; Seike, Yasuhiko; Yamanaka, Yasuhiro; Shibata, Kenji; Manabe, Kyoichi

    1984-12-01

    To demonstrate Waste Incineration System (WIS) which our company has been licensed by Combustion Engineering Inc., USA we installed a demonstration test plant in our Hiratsuka Research Laboratory and started the demonstration test on January 1984. One of the characteristics of this system is to be able to process many kinds of wastes with only one system, and to get high volume reduction factors. In our test plant, we processed paper, cloth, wood, polyethylene sheets as the samples of solid combustible wastes and spent ion exchange resins with incineration and processed condensed liquid wastes with spray drying. We have got good performances and enough Decontamination Factor (DF) data for the dust control equipment. In this paper, we introduce this demonstration test plant and report the test results up to date. (author).

  17. 21 CFR 864.9300 - Automated Coombs test systems.

    Science.gov (United States)

    2010-04-01

    ... Blood and Blood Products § 864.9300 Automated Coombs test systems. (a) Identification. An automated Coombs test system is a device used to detect and identify antibodies in patient sera or antibodies bound... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Automated Coombs test systems. 864.9300 Section...

  18. 21 CFR 862.1770 - Urea nitrogen test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Urea nitrogen test system. 862.1770 Section 862....1770 Urea nitrogen test system. (a) Identification. A urea nitrogen test system is a device intended to measure urea nitrogen (an end-product of nitrogen metabolism) in whole blood, serum, plasma, and urine...

  19. An overview of a knowledge based system for preventive maintenance support of nuclear power plants

    International Nuclear Information System (INIS)

    Terano, Takao; Nishiyama, Takuya; Yokoo, Takeshi

    1984-01-01

    In recent years, much interest has been paid to knowledge engineering techniques for new vehicles of advanced information processing. As a practical application in electric power industry, this report discusses a knowledge based system for supporting preventive maintenance of nuclear power plants. To support preventive maintenance tasks, the system must have facilities to reason failures and accidents of the plants, to evaluate their significance, to predict any possible troubles, and to indentify appropriate preventive countermeasures for them. This report describes the overview of the prototype system from a viewpoint of knowledge engineering. The results of the study are as follows: (1) The knowledge base of the prototype system consists of a data-base on plants and a rule-base derived from experts' knowledge. Using the information in the knowledge base, the system diagnoses the plant without real-time interaction with operational plants. (2) Expert's knowledge in the rule-base is represented in the non-procedural declarative forms. These rules are organized in some hierarchical structure so as to be used efficiently and used in conjunction with the corresponding set of plant information in the data-base. (3) The prototype system is incrementally developed with the rapid prototyping techniques, that is, the processes of design, implementation and evaluation are repeated several times. (author)

  20. The Method of System Test using I/O Stimulator

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jang Yeol; Lee, Dong Young; Kim, Chang Hoi [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    In general, the software development life cycle consists of the requirement phase, design phase, implementation phase, testing phase, integration phase (software-software integration, software-hardware integration), installation phase, and operation and maintenance phase. The fundamental parts to the testing phase are component test, software integration test, software hardware integration test, and system test. Among these tests, we focused in particular on system test using I/O stimulator. The system test operates the functionality, performance, and interface because system testing falls within the scope of black box testing, which should not require knowledge of the inner design of the code or logic. The purpose of developing a system test using a I/O stimulator is to save time and effort from the functionality and performance tests. We developed an I/O stimulator for the burning system test based on the operational scenario. The hardware, software, and manmachine- interface (MMI) are fundamental parts to the I/O stimulator. Signal sources from the I/O stimulator contain analog input, analog output, digital input, digital output, a Programmable Power Supply, an RS232C Serial interface and a dual port Ethernet interface. While automation cannot reproduce everything that a software engineer can do, it can be extremely useful for the system test. However, it does require the test criteria and a well-developed test suite of the testing scripts in order to be useful. In this study, we developed a multipurpose and cost-efficient I/O stimulator using LabVIEW program instead of the testing scripts.

  1. The Method of System Test using I/O Stimulator

    International Nuclear Information System (INIS)

    Kim, Jang Yeol; Lee, Dong Young; Kim, Chang Hoi

    2016-01-01

    In general, the software development life cycle consists of the requirement phase, design phase, implementation phase, testing phase, integration phase (software-software integration, software-hardware integration), installation phase, and operation and maintenance phase. The fundamental parts to the testing phase are component test, software integration test, software hardware integration test, and system test. Among these tests, we focused in particular on system test using I/O stimulator. The system test operates the functionality, performance, and interface because system testing falls within the scope of black box testing, which should not require knowledge of the inner design of the code or logic. The purpose of developing a system test using a I/O stimulator is to save time and effort from the functionality and performance tests. We developed an I/O stimulator for the burning system test based on the operational scenario. The hardware, software, and manmachine- interface (MMI) are fundamental parts to the I/O stimulator. Signal sources from the I/O stimulator contain analog input, analog output, digital input, digital output, a Programmable Power Supply, an RS232C Serial interface and a dual port Ethernet interface. While automation cannot reproduce everything that a software engineer can do, it can be extremely useful for the system test. However, it does require the test criteria and a well-developed test suite of the testing scripts in order to be useful. In this study, we developed a multipurpose and cost-efficient I/O stimulator using LabVIEW program instead of the testing scripts

  2. 21 CFR 862.1815 - Vitamin E test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vitamin E test system. 862.1815 Section 862.1815....1815 Vitamin E test system. (a) Identification. A vitamin E test system is a device intended to measure vitamin E (tocopherol) in serum. Measurements obtained by this device are used in the diagnosis and...

  3. 21 CFR 862.1450 - Lactic acid test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Lactic acid test system. 862.1450 Section 862.1450....1450 Lactic acid test system. (a) Identification. A lactic acid test system is a device intended to measure lactic acid in whole blood and plasma. Lactic acid measurements that evaluate the acid-base status...

  4. 21 CFR 862.1730 - Free tyrosine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Free tyrosine test system. 862.1730 Section 862....1730 Free tyrosine test system. (a) Identification. A free tyrosine test system is a device intended to measure free tyrosine (an amono acid) in serum and urine. Measurements obtained by this device are used in...

  5. Prototype Engineered Barrier System Field Tests

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Beatty, J.; Buscheck, T.A.

    1989-01-01

    This paper presents selected preliminary results obtained during the first 54 days of the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed in G-Tunnel within the Nevada Test Site. The test described is a precursor to the Engineered Barrier Systems Field Tests (EBSFT). The EBSFT will consist of in situ tests of the geohydrologic and geochemical environment in the near field (within a few meters) of heaters emplaced in welded tuff to simulate the thermal effects of waste packages. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures for future investigations that will be conducted in the Exploratory Shaft Facilities of the Yucca Mountain Project (YMP). The paper discusses the evolution of hydrothermal behavior during the prototype test, including rock temperatures, changes in rock moisture content, air permeability of fractures, gas pressures, and rock mass gas-phase humidity. 10 refs., 12 figs

  6. Interleukin-1β inhibits insulin signaling and prevents insulin-stimulated system A amino acid transport in primary human trophoblasts.

    Science.gov (United States)

    Aye, Irving L M H; Jansson, Thomas; Powell, Theresa L

    2013-12-05

    Interleukin-1β (IL-1β) promotes insulin resistance in tissues such as liver and skeletal muscle; however the influence of IL-1β on placental insulin signaling is unknown. We recently reported increased IL-1β protein expression in placentas of obese mothers, which could contribute to insulin resistance. In this study, we tested the hypothesis that IL-1β inhibits insulin signaling and prevents insulin-stimulated amino acid transport in cultured primary human trophoblast (PHT) cells. Cultured trophoblasts isolated from term placentas were treated with physiological concentrations of IL-1β (10pg/ml) for 24h. IL-1β increased the phosphorylation of insulin receptor substrate-1 (IRS-1) at Ser307 (inhibitory) and decreased total IRS-1 protein abundance but did not affect insulin receptor β expression. Furthermore, IL-1β inhibited insulin-stimulated phosphorylation of IRS-1 (Tyr612, activation site) and Akt (Thr308) and prevented insulin-stimulated increase in PI3K/p85 and Grb2 protein expression. IL-1β alone stimulated cRaf (Ser338), MEK (Ser221) and Erk1/2 (Thr202/Tyr204) phosphorylation. The inflammatory pathways nuclear factor kappa B and c-Jun N-terminal kinase, which are involved in insulin resistance, were also activated by IL-1β treatment. Moreover, IL-1β inhibited insulin-stimulated System A, but not System L amino acid uptake, indicating functional impairment of insulin signaling. In conclusion, IL-1β inhibited the insulin signaling pathway by inhibiting IRS-1 signaling and prevented insulin-stimulated System A transport, thereby promoting insulin resistance in cultured PHT cells. These findings indicate that conditions which lead to increased systemic maternal or placental IL-1β levels may attenuate the effects of maternal insulin on placental function and consequently fetal growth. Published by Elsevier Ireland Ltd.

  7. TRENDS: The aeronautical post-test database management system

    Science.gov (United States)

    Bjorkman, W. S.; Bondi, M. J.

    1990-01-01

    TRENDS, an engineering-test database operating system developed by NASA to support rotorcraft flight tests, is described. Capabilities and characteristics of the system are presented, with examples of its use in recalling and analyzing rotorcraft flight-test data from a TRENDS database. The importance of system user-friendliness in gaining users' acceptance is stressed, as is the importance of integrating supporting narrative data with numerical data in engineering-test databases. Considerations relevant to the creation and maintenance of flight-test database are discussed and TRENDS' solutions to database management problems are described. Requirements, constraints, and other considerations which led to the system's configuration are discussed and some of the lessons learned during TRENDS' development are presented. Potential applications of TRENDS to a wide range of aeronautical and other engineering tests are identified.

  8. Prevalence of periodontal disease, its association with systemic diseases and prevention.

    Science.gov (United States)

    Nazir, Muhammad Ashraf

    2017-01-01

    Periodontal diseases are prevalent both in developed and developing countries and affect about 20-50% of global population. High prevalence of periodontal disease in adolescents, adults, and older individuals makes it a public health concern. Several risk factors such as smoking, poor oral hygiene, diabetes, medication, age, hereditary, and stress are related to periodontal diseases. Robust evidence shows the association of periodontal diseases with systemic diseases such as cardiovascular disease, diabetes, and adverse pregnancy outcomes. Periodontal disease is likely to cause 19% increase in the risk of cardiovascular disease, and this increase in relative risk reaches to 44% among individuals aged 65 years and over. Type 2 diabetic individuals with severe form of periodontal disease have 3.2 times greater mortality risk compared with individuals with no or mild periodontitis. Periodontal therapy has been shown to improve glycemic control in type 2 diabetic subjects. Periodontitis is related to maternal infection, preterm birth, low birth weight, and preeclampsia. Oral disease prevention strategies should be incorporated in chronic systemic disease preventive initiatives to curtail the burden of disease in populations. The reduction in the incidence and prevalence of periodontal disease can reduce its associated systemic diseases and can also minimize their financial impact on the health-care systems. It is hoped that medical, dental practitioners, and other health-care professionals will get familiar with perio-systemic link and risk factors, and need to refer to the specialized dental or periodontal care.

  9. Utility of opium seed extract tests in preventing hypersensitivity reactions during surgery.

    Science.gov (United States)

    Armentia, A; Pineda, F; Palacios, R; Martín-Gil, F-J; Miguel, A S; Arenal, J J; Tejedor, J; Tef, B M

    2014-01-01

    Anaphylaxis during anaesthesia is fatal in 3-9% of patients and analgesics, including opioids, and is the second most common medicament-related cause, although the prevalence is underestimated. We recently found that patients may generate IgE antibodies to opium seeds. To determine the diagnostic accuracy of specific antibodies to morphine, codeine, rocuronium and oil body and aqueous fractions of Papaver somniferum seeds in the diagnosis and prevention of allergy to opioids. Patients with hypersensitivity reactions during surgery, and severe clinical allergy (pollen, tobacco), and illicit heroin users were selected. The sensitivity, specificity and predictive values of in vivo and in vitro diagnostic techniques including oil body and aqueous fractions of P. somniferum seeds were measured. We studied 203 patients, with mean age 35.1±17.1 and 200 healthy controls. Patients sensitised to heroin or with hypersensitivity reactions during surgery responded to P. somniferum seed tests. Of patients not known to be sensitised to opioids, the highest positivity was in patients sensitised to tobacco (pOpium seed skin tests and IgE, especially the oil body fraction, were more sensitive (64.2%) and specific (98.4%) than morphine, codeine and rocuronium tests for opioid sensitivity. Pollen allergy was not a risk factor for sensitisation to morphine. Sensitivity to opioids and intraoperative anaphylaxis can be diagnosed by routine tests. IgE and skin tests for the oil body fraction of P. somniferum had the highest sensitivity for sensitisation to opioids. Copyright © 2012 SEICAP. Published by Elsevier Espana. All rights reserved.

  10. Acquisition system testing with superfluid helium

    International Nuclear Information System (INIS)

    Anderson, J.E.; Fester, D.A.; DiPirro, M.J.

    1988-01-01

    NASA is evaluating both a thermomechanical pump and centrifugal pump for the SHOOT experiment using capillary fluid acquisition systems. Tests were conducted for these systems with superfluid helium under adverse operating conditions. Minus one-g outflow tests were run in conjunction with the thermomechanical pump. Both fine mesh screen and porous sponges were tested. A screen acquisition device was also tested with the low-NPSH centrifugal pump. Results to date show that the screen and sponge are capable of supplying superfluid helium to the thermomechanical pump inlet against a one-g head up to four cm. This is more than sufficient for the SHOOT application. Results with the sponge were reproducible while those with the screen could not always be repeated

  11. Radioisotope Thermoelectric Generator Transporation System licensed hardware second certification test series and package shock mount system test

    International Nuclear Information System (INIS)

    Ferrell, P.C.; Moody, D.A.

    1995-10-01

    This paper presents a summary of two separate drop test a e performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of Title 10, Code of Federal Regulations, ''Part 71'' (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, Transit Drop Procedure (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G's at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G's was not exceeded in any test from a free drop height of 457 mm (18 in.)

  12. 21 CFR 862.1230 - Cyclic AMP test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cyclic AMP test system. 862.1230 Section 862.1230....1230 Cyclic AMP test system. (a) Identification. A cyclic AMP test system is a device intended to measure the level of adenosine 3′, 5′-monophosphate (cyclic AMP) in plasma, urine, and other body fluids...

  13. Development of an Advanced Digital Reactor Protection System Using Diverse Dual Processors to Prevent Common-Mode Failure

    International Nuclear Information System (INIS)

    Shin, Hyun Kook; Nam, Sang Ku; Sohn, Se Do; Chang, Hoon Seon

    2003-01-01

    The advanced digital reactor protection system (ADRPS) with diverse dual processors has been developed to prevent common-mode failure (CMF). The principle of diversity is applied to both hardware design and software design. For hardware diversity, two different types of CPUs are used for the bistable processor and local coincidence logic (LCL) processor. The Versa Module Eurocard-based single board computers are used for the CPU hardware platforms. The QNX operating system and the VxWorks operating system were selected for software diversity. Functional diversity is also applied to the input and output modules, and to the algorithm in the bistable processors and LCL processors. The characteristics of the newly developed digital protection system are described together with the preventive capability against CMF. Also, system reliability analysis is discussed. The evaluation results show that the ADRPS has a good preventive capability against the CMF and is a highly reliable reactor protection system

  14. A Context-Aware Indoor Air Quality System for Sudden Infant Death Syndrome Prevention

    Directory of Open Access Journals (Sweden)

    Daniel H. De La Iglesia

    2018-03-01

    Full Text Available Context-aware monitoring systems designed for e-Health solutions and ambient assisted living (AAL play an important role in today’s personalized health-care services. The majority of these systems are intended for the monitoring of patients’ vital signs by means of bio-sensors. At present, there are very few systems that monitor environmental conditions and air quality in the homes of users. A home’s environmental conditions can have a significant influence on the state of the health of its residents. Monitoring the environment is the key to preventing possible diseases caused by conditions that do not favor health. This paper presents a context-aware system that monitors air quality to prevent a specific health problem at home. The aim of this system is to reduce the incidence of the Sudden Infant Death Syndrome, which is triggered mainly by environmental factors. In the conducted case study, the system monitored the state of the neonate and the quality of air while it was asleep. The designed proposal is characterized by its low cost and non-intrusive nature. The results are promising.

  15. Automated real-time testing (ARTT) for embedded control systems (ECS)

    International Nuclear Information System (INIS)

    Hawkins, J; Howard, R; Nguyen, H.

    2001-01-01

    Many of today's automated real-time testing systems for embedded systems were developed using expensive custom hardware and software. In this article they describe how to use commercially available off-the-shelf hardware and software to design and develop an automated real-time test systems for Embedded Programmable Logic Controller (PLC) Based Control Systems. The system development began with the implementation of the VALI/TEST Pro testing methodology as a means for structuring the testing. Using this methodology, they were able to decompose system requirement documents for a Personnel Safety System (PSS) into its high, intermediate and detail level requirements. next, the validation procedures for the PSS system were decomposed into testing units called builds, test runs and test cases. To measure the PSS system's test coverage three levels of system requirements were mapped to their respective unit level of test using a specially constructed validation matrix that was designed to handle over 150 test cases and requirements. All of the above work led to the development of an Automated Real-Time Test System (ARTTS) that is capable of performing complete black box testing in real-time for Embedded PLC Based Control Systems. Also note, that the PSS system under test and mentioned in this paper is located at the Advance Photon Source (APS) at Argonne National Laboratory Basic Energy Science Facility in Argonne, Illinois

  16. Managing industrial risk--having a tested and proven system to prevent and assess risk.

    Science.gov (United States)

    Heller, Stephen

    2006-03-17

    Some relatively easy techniques exist to improve the risk picture/profile to aid in preventing losses. Today with the advent of computer system resources, focusing on specific aspects of risk through systematic scoring and comparison, the risk analysis can be relatively easy to achieve. Techniques like these demonstrate how working experience and common sense can be combined mathematically into a flexible risk management tool or risk model for analyzing risk. The risk assessment methodology provided by companies today is no longer the ideas and practices of one group or even one company. It is reflective of the practice of many companies, as well as the ideas and expertise of academia and government regulators. The use of multi-criteria decision making (MCDM) techniques for making critical decisions has been recognized for many years for a variety of purposes. In today's computer age, the easy accessing and user-friendly nature for using these techniques, makes them a favorable choice for use in the risk assessment environment. The new user of these methodologies should find many ideas directly applicable to his or her needs when approaching risk decision making. The user should find their ideas readily adapted, with slight modification, to accurately reflect a specific situation using MCDM techniques. This makes them an attractive feature for use in assessment and risk modeling. The main advantage of decision making techniques, such as MCDM, is that in the early stages of a risk assessment, accurate data on industrial risk, and failures are lacking. In most cases, it is still insufficient to perform a thorough risk assessment using purely statistical concepts. The practical advantages towards deviating from strict data-driven protocol seem to outweigh the drawbacks. Industry failure data often comes at a high cost when a loss occurs. We can benefit from this unfortunate acquisition of data through the continuous refining of our decisions by incorporating this new

  17. White gauze test: a novel technique in preventing post-hepatectomy bile leak.

    Science.gov (United States)

    Yugasaravanan, K; Affirul, C A; Zamri, Z; Azlanudin, A; Bong, J J

    Post-hepatectomy bile leak may lead to undesired morbidity. Multiple methods have been employed to identify this leak but can be inconclusive and taxing. This novel white gauze test is a simple and reliable method. This is a prospective study performed from January 2010 until March 2011. All open hepatic resection were included. Dry white gauze is compressed onto the transected surface and observed for bile staining. The leaking duct is repaired immediately upon detection. The process is repeated until negative. Drain was removed on postoperative day-5. Post-operative bile leak is defined as: 1. Bilirubin concentration of the drain fluid is 3 times or higher than serum; 2. Presence of intra-abdominal bile collection on imaging and upon drainage; 3. Bile leak demonstrated on postoperative cholangiography. 42 patients were recruited. Seven (16.7%) patients were cirrhotic with Child-Pugh A. White gauze test were positive for intra-operative bile leaks in 29 patients (70%), which were primarily repaired. As a result, there was no postoperative bile leak in this series. One mortality was detected in this series due to postoperative pancreatic fistula and multi organ failure. The White Gauze Test is a useful method for the prevention of bile leakage after hepatic resection. It is safe, quick and cheap.

  18. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  19. Multisignal detecting system of pile integrity testing

    Science.gov (United States)

    Liu, Zuting; Luo, Ying; Yu, Shihai

    2002-05-01

    The low strain reflection wave method plays a principal rule in the integrating detection of base piles. However, there are some deficiencies with this method. For example, there is a blind area of detection on top of the tested pile; it is difficult to recognize the defects at deep-seated parts of the pile; there is still the planar of 3D domino effect, etc. It is very difficult to solve these problems only with the single-transducer pile integrity testing system. A new multi-signal piles integrity testing system is proposed in this paper, which is able to impulse and collect signals on multiple points on top of the pile. By using the multiple superposition data processing method, the detecting system can effectively restrain the interference and elevate the precision and SNR of pile integrity testing. The system can also be applied to the evaluation of engineering structure health.

  20. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, C.K., E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); Lee, K.J., E-mail: klee@khu.ac.kr [Kyung Hee Univ., Seoul (Korea, Republic of)

    2014-07-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  1. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    International Nuclear Information System (INIS)

    Chang, C.K.; Lee, K.J.

    2014-01-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  2. Obesity Prevention: The Impact of Local Health Departments

    Science.gov (United States)

    Chen, Zhuo (Adam); Roy, Kakoli; Gotway Crawford, Carol A

    2013-01-01

    Objective To examine the association between bodyweight status and provision of population-based prevention services. Data Sources The National Association of City and County Health Officials 2005 Profile survey data, linked with two cross-sections of the Behavioral Risk Factor Surveillance System (BRFSS) survey in 2004 and 2005. Study Design Multilevel logistic regressions were used to examine the association between provision of obesity-prevention services and the change in risk of being obese or morbidly obese among BRFSS respondents. The estimation sample was stratified by sex. Low-income samples were also examined. Falsification tests were used to determine whether there is counterevidence. Principal Findings Provision of population-based obesity-prevention services within the jurisdiction of local health departments and specifically those provided by the local health departments are associated with reduced risks of obesity and morbid obesity from 2004 to 2005. The magnitude of the association appears to be stronger among low-income populations and among women. Results of the falsification tests provide additional support of the main findings. Conclusions Population-based obesity-prevention services may be useful in containing the obesity epidemic. PMID:22816510

  3. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  4. Study on service test procedure for SMES systems

    Energy Technology Data Exchange (ETDEWEB)

    Ren, L., E-mail: rl8868@126.co [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Tang, Y.; Li, J.; Shi, J. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China); Hu, Y. [State Grid Electric Power Research Institute, Wuhan 430074 (China); Guo, F.; Chen, L.; Cheng, S. [R and D Center of Applied Superconductivity, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-10-15

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T{sub c} SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T{sub c} SMES system are studied. For performance evaluation of this high-T{sub c} SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  5. Study on service test procedure for SMES systems

    International Nuclear Information System (INIS)

    Ren, L.; Tang, Y.; Li, J.; Shi, J.; Hu, Y.; Guo, F.; Chen, L.; Cheng, S.

    2009-01-01

    Some superconducting magnetic energy storage (SMES) systems have been developed successfully, and the function of them was verified by experiment. Considering the impact on the system security and stability when they are connected to the power system, it is important to build a standard test procedure and propose the main experimental contents for some representative superconducting devices. Based on the experimental results of a 35 kJ/7 kW conduction-cooled high-T c SMES system, which was developed by Huazhong University of Science and Technology, the test items and methods for a conduction-cooled high-T c SMES system are studied. For performance evaluation of this high-T c SMES, three superconducting magnet performance tests, power conditioning characteristic test and dynamic experiment in a simulated power system were fulfilled.

  6. Preoperational test report, primary ventilation condensate system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-01-29

    Preoperational test report for Primary Ventilation Condensate System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides a collection point for condensate generated by the W-030 primary vent offgas cooling system serving tanks AYIOI, AY102, AZIOI, AZI02. The system is located inside a shielded ventilation equipment cell and consists of a condensate seal pot, sampling features, a drain line to existing Catch Tank 241-AZ-151, and a cell sump jet pump. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  7. Applications to marine disaster prevention spilled oil and gas tracking buoy system

    CERN Document Server

    2017-01-01

    This book focuses on the recent results of the research project funded by a Grant-in-Aid for Scientific Research (S) of the Japan Society for the Promotion of Science (No. 23226017) from FY 2011 to FY 2015 on an autonomous spilled oil and gas tracking buoy system and its applications to marine disaster prevention systems from a scientific point of view. This book spotlights research on marine disaster prevention systems related to incidents involving oil tankers and offshore platforms, approaching these problems from new scientific and technological perspectives. The most essential aspect of this book is the development of a deep-sea underwater robot for real-time monitoring of blowout behavior of oil and gas from the seabed and of a new type of autonomous surface vehicle for real-time tracking and monitoring of oil spill spread and drift on the sea surface using an oil sensor. The mission of these robots is to provide the simulation models for gas and oil blowouts or spilled oil drifting on the sea surface w...

  8. Fermilab tevatron five refrigerator system tests

    International Nuclear Information System (INIS)

    Rode, C.; Ferry, R.; Leiniger, M.; Makara, J.; Misek, J.; Mizicko, D.; Richied, D.; Theilacker, J.

    1982-01-01

    The Fermilab Tevatron refrigeration system is described with the layout illustrated. The compressor control loops, the refrigerator control loops, and magnet control loops (two per refrigerator) are described and each illustrated. The mobile purifier is described. A five refrigerator test is presented, using two compressor buildings, satellite refrigerator concept test and the test current to the writing. The configuration of the five refrigerator test is diagramed

  9. INEL test plan for evaluating waste assay systems

    International Nuclear Information System (INIS)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP

  10. INEL test plan for evaluating waste assay systems

    Energy Technology Data Exchange (ETDEWEB)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  11. Analysis and prevention of water hammer for the emergency core cooling system

    International Nuclear Information System (INIS)

    Zhao Jun

    2008-01-01

    Emergency core cooling system (ECCS) is an engineered safety feature of nuclear power plant. If the water hammer happens during ECCS injection, the piping system may be broken. It will cause loss of ECC system and affect the safety of reactor core. Based on the functions and characteristics of ECCS and the theory of water hammer, the paper analyzed the potential risk of water hammer in ECCS in Qinshan III, and proposed modifications to prevent the water-hammer damage during ECCS injection. (authors)

  12. Routine testing on protective and safety systems and components

    International Nuclear Information System (INIS)

    Rysy, W.

    1977-01-01

    1) In-process inspection, tests during commissioning. 2) Tests during reactor operation. 2.1) Reactor protection system, for example: continuous auto-testing by a dynamic system, check of the output signals; 2.2) safety features: selected examples: functional tests on the ECCS, trial operation of the emergency diesels. 3) Tests during refuelling phase. 3.1) Containment: Leakage rate tests, leak testing; 3.2) coolant system: selected examples: inservice inspections of the pressure vessel, eddy current testing of the steam generator, functional tests of safety valves. (orig./HP) [de

  13. Powertrain instrumentation and test systems development, hybridization, electrification

    CERN Document Server

    Paulweber, Michael

    2016-01-01

    The book deals with the increasingly complex test systems for powertrain components and systems giving an overview of the diverse types of test beds for all components of an advanced powertrain focusing on specific topics such as instrumentation, control, simulation, hardware-in-the-loop, automation or test facility management. This book is intended for powertrain (component) development engineers, test bed planners, test bed operators and beginners.

  14. Fiscal 2000 research report on the research on earthquake disaster prevention technology for industrial machinery systems; 2000 nendo sangyo kikai system no boshin bosai gijutsu no chosa kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Available technologies were extracted and technical problems were discussed in detail in connection with the above-named technology, and a technology development scenario was prepared. The study covered the subjects of an earthquake resistant disaster prevention system, ready for activation upon earthquake occurrence, with its structure designed to counter severe vibration; a real-time earthquake resistant disaster prevention system capable of ensuring system safety upon receiving earthquake occurrence information and of instantly collecting information on damage incurred; and an early restoration system to operate upon termination of earthquake. With the active utilization in mind of information technology now making a rapid progress, importance was stressed of a system under which earthquake information, disaster prevention networks, and information on the soil and geography would be linked to the database of the equipment involved. For research on the current state of earthquake disaster prevention technology, an on-site survey was conducted of the disaster prevention facilities now under construction in Hyogo Prefecture, and another survey was conducted of Shizuoka Prefecture's long-standing consideration of earthquake disaster prevention measures. Data were collected at the 5th Corporate Disaster Prevention Symposium held in San Jose, U.S. (NEDO)

  15. Vital Signs-Cervical Cancer is Preventable!

    Centers for Disease Control (CDC) Podcasts

    This podcast is based on the November 2014 CDC Vital Signs report. Every visit to a doctor or nurse is an opportunity to prevent cervical cancer. Women can get a Pap test and HPV test to help prevent cervical cancer and adolescent boys and girls can get the HPV vaccination series to help prevent cervical and other cancers.

  16. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  17. Lymphocyte antibody-dependent cytotoxicity test for evaluation of clinical role of monoclonal anti-D-antibodies for prevention of rhesus sensitization.

    Science.gov (United States)

    Olovnikova, N I; Belkina, E V; Nikolaeva, T L; Miterev, G Yu; Chertkov, I L

    2006-01-01

    Monoclonal antibodies to D antigen were studied in the reaction of antibody-dependent cytotoxicity for evaluation of the possibility of using these antibodies for preventing rhesus sensitization. High hemolytic activity of four anti-D-monoclonal antibodies in the antibody-dependent cytotoxicity test, mediated by their interaction with FcgammaRI, and the capacity to accelerate elimination of D+ erythrocytes from circulation did not provide the immunosuppressive effect. It was hypothesized that monoclonal antibodies for prevention of rhesus sensitization should interact with FcgammaRIII on lymphocytes. These monoclonal antibodies are extremely rare: only 4 of 125 studied antibodies mediated hemolysis in the antibody-dependent cytotoxicity test with lymphocytes, while all polyclonal anti-D-preparations exhibited this activity.

  18. Antithrombotic Protective Effects of Arg-Pro-Gly-Pro Peptide during Emotional Stress Provoked by Forced Swimming Test in Rats.

    Science.gov (United States)

    Grigor'eva, M E; Lyapina, L A

    2017-01-01

    Blood coagulation was enhanced and all factors (total, enzyme, and non-enzyme) of the fibrinolytic system were suppressed in rats in 60 min after forced swimming test. Argininecontaining tetrapeptide glyproline Arg-Pro-Gly-Pro administered prior to this test activated fibrinolysis and prevented hypercoagulation. Administration of this peptide in 5 min after swimming test also enhanced anticoagulant, fibrinolytic, and antithrombotic activity of the blood. Therefore, glyproline Arg-Pro-Gly-Pro exerted both preventive and curative effects on the hemostasis system and prevented enhancement of blood coagulation provoked by emotional stress modeled by forced swimming test.

  19. Generic test platform for representative tests of safety I/C systems - 15546

    International Nuclear Information System (INIS)

    Fourestie, B.; Kuck, H.; Richter, J.; Rieche, S.; Waitz, M.

    2015-01-01

    In compliance with the IEC 61513 safety Instrumentation and Control (I/C) systems must be successfully validated in their final configuration prior to installation on site and commissioning. However the contingent need for modifications during system validation activities or subsequently during the commissioning phase may entail long and costly re-engineering of the I/C systems. With the view to ease these possible modifications, a Generic Test Platform has been developed by AREVA which allows combining a real I/C system subpart with an emulation server. This platform provides a faithful representation of the I/C System allowing crediting the validation test results carried out on this platform. (authors)

  20. Scheduling system for test automation framework

    NARCIS (Netherlands)

    Wahyudi, Djohan

    2014-01-01

    An Interventional X-ray (iXR) system provides real time X-ray imaging with high image clarity and low X-ray dose. After several years of development, the iXR System has become complex. In order to verify the correct operation of the system, the system integration and test group performs extensive

  1. Verification test of control rod system for HTR-10

    International Nuclear Information System (INIS)

    Zhou Huizhong; Diao Xingzhong; Huang Zhiyong; Cao Li; Yang Nianzu

    2002-01-01

    There are 10 sets of control rods and driving devices in 10 MW High Temperature Gas-cooled Test Reactor (HTR-10). The control rod system is the controlling and shutdown system of HTR-10, which is designed for reactor criticality, operation, and shutdown. In order to guarantee technical feasibility, a series of verification tests were performed, including room temperature test, thermal test, test after control rod system installed in HTR-10, and test of control rod system before HTR-10 first criticality. All the tests data showed that driving devices working well, control rods running smoothly up and down, random position settling well, and exactly position indicating

  2. Seismic proving test of process computer systems with a seismic floor isolation system

    International Nuclear Information System (INIS)

    Fujimoto, S.; Niwa, H.; Kondo, H.

    1995-01-01

    The authors have carried out seismic proving tests for process computer systems as a Nuclear Power Engineering Corporation (NUPEC) project sponsored by the Ministry of International Trade and Industry (MITI). This paper presents the seismic test results for evaluating functional capabilities of process computer systems with a seismic floor isolation system. The seismic floor isolation system to isolate the horizontal motion was composed of a floor frame (13 m x 13 m), ball bearing units, and spring-damper units. A series of seismic excitation tests was carried out using a large-scale shaking table of NUPEC. From the test results, the functional capabilities during large earthquakes of computer systems with a seismic floor isolation system were verified

  3. Performance testing SPECT systems: Recent developments

    International Nuclear Information System (INIS)

    Todd-Pokropek, A.

    1985-01-01

    A protocol is used to test as many currently available systems as possible, including both rotating gamma camera systems from GE, Siemens, Toshiba, Technicare, Elscint, Philips, Picker, etc, and single/multi slice system such as the Medimatic. This paper indicates changes that have occurred with respect to preliminary results previously published. Reconstructions were performed in a standard manner, using a Ramp filter and without attenuation correction, in order to reduce the effect of differences in software. The Jaszczak phantom was used to assess overall image quality. Tests were performed using the different collimators available. Image quality improved with better spatial resolution, even at the expense of sensitivity. Non-circular orbits, where available, were tested, and resolution was comparing for various positions and directions. With double headed systems, the results obtained were compared to those using a single head alone. Some gain in image quality seems to have been achieved by better uniformity resulting from improved correction circuitry, by the use of non-circular orbits, and from scatter correction. Potential still exists to improve collimator design

  4. Data acquisition and test system software

    International Nuclear Information System (INIS)

    Bourgeois, N.A. Jr.

    1979-03-01

    Sandia Laboratories has been assigned the task by the Base and Installation Security Systems (BISS) Program Office to develop various aspects of perimeter security systems. One part of this effort involves the development of advanced signal processing techniques to reduce the false and nuisance alarms from sensor systems while improving the probability of intrusion detection. The need existed for both data acquisition hardware and software. Also, the hardware is used to implement and test the signal processing algorithms in real time. The hardware developed for this signal processing task is the Data Acquisition and Test System (DATS). The programs developed for use on DATS are described. The descriptions are taken directly from the documentation included within the source programs themselves

  5. A game-theoretic approach to real-time system testing

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Li, Shuhao

    2008-01-01

    This paper presents a game-theoretic approach to the testing of uncontrollable real-time systems. By modelling the systems with Timed I/O Game Automata and specifying the test purposes as Timed CTL formulas, we employ a recently developed timed game solver UPPAAL-TIGA to synthesize winning...... strategies, and then use these strategies to conduct black-box conformance testing of the systems. The testing process is proved to be sound and complete with respect to the given test purposes. Case study and preliminary experimental results indicate that this is a viable approach to uncontrollable timed...... system testing....

  6. NFC based Inspection and Qualification Management (NIQM) System Preventing Counterfeit and Fraudulent Item

    International Nuclear Information System (INIS)

    Chang, Choong Koo; Kim, Young Joo

    2013-01-01

    Design, manufacturing, fabrication, transportation and installation of the devices and equipment for nuclear power plants shall be conducted under the thorough quality assurance program for the nuclear safety. However, from late in the 1980s, NRC began to issue a number of communications alerting licenses to issues involving counterfeit and fraudulent items. A number of incidents identified by the NRC in the 1980s and 1990s catalyzed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to develop the NFC (Near Field Communication) based Inspection and Qualification Management(NIQM) system preventing counterfeit and fraudulent items. NFC is one of the latest wireless communication technologies. As a short-range wireless connectivity technology, NFC offers safe-yet simple and intuitive-communication between electronic devices. As described above, NFC technology can be applied to the inspection and qualification management system very effectively to prevent counterfeit and fraudulent items. In addition, NIQM system can use existing data and information through the interface with legacy system

  7. NFC based Inspection and Qualification Management (NIQM) System Preventing Counterfeit and Fraudulent Item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Choong Koo; Kim, Young Joo [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    Design, manufacturing, fabrication, transportation and installation of the devices and equipment for nuclear power plants shall be conducted under the thorough quality assurance program for the nuclear safety. However, from late in the 1980s, NRC began to issue a number of communications alerting licenses to issues involving counterfeit and fraudulent items. A number of incidents identified by the NRC in the 1980s and 1990s catalyzed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to develop the NFC (Near Field Communication) based Inspection and Qualification Management(NIQM) system preventing counterfeit and fraudulent items. NFC is one of the latest wireless communication technologies. As a short-range wireless connectivity technology, NFC offers safe-yet simple and intuitive-communication between electronic devices. As described above, NFC technology can be applied to the inspection and qualification management system very effectively to prevent counterfeit and fraudulent items. In addition, NIQM system can use existing data and information through the interface with legacy system.

  8. The prediction and prevention of voltage collapse in the Finnish power system

    Energy Technology Data Exchange (ETDEWEB)

    Bastman, J; Lakervi, E [Tampere Univ. of Tech. (Finland); Hirvonen, R; Kuronen, P; Hagman, E [IVO Group (Finland)

    1994-12-31

    The Finnish power system is a part of the Nordic power system (NORDEL), which includes Finland, Sweden, Norway and the eastern part of Denmark. In NORDEL the transmission distances are long, which implies that the power transmission capacities are determined by stability criteria . The methods to prevent and predict the voltage collapse during severe disturbances are studied using advances simulation program. Results are presented. (author) 10 figs., 1 tab.

  9. Electronic Information Standards to Support Obesity Prevention and Bridge Services Across Systems, 2010-2015.

    Science.gov (United States)

    Wiltz, Jennifer L; Blanck, Heidi M; Lee, Brian; Kocot, S Lawrence; Seeff, Laura; McGuire, Lisa C; Collins, Janet

    2017-10-26

    Electronic information technology standards facilitate high-quality, uniform collection of data for improved delivery and measurement of health care services. Electronic information standards also aid information exchange between secure systems that link health care and public health for better coordination of patient care and better-informed population health improvement activities. We developed international data standards for healthy weight that provide common definitions for electronic information technology. The standards capture healthy weight data on the "ABCDs" of a visit to a health care provider that addresses initial obesity prevention and care: assessment, behaviors, continuity, identify resources, and set goals. The process of creating healthy weight standards consisted of identifying needs and priorities, developing and harmonizing standards, testing the exchange of data messages, and demonstrating use-cases. Healthy weight products include 2 message standards, 5 use-cases, 31 LOINC (Logical Observation Identifiers Names and Codes) question codes, 7 healthy weight value sets, 15 public-private engagements with health information technology implementers, and 2 technical guides. A logic model and action steps outline activities toward better data capture, interoperable systems, and information use. Sharing experiences and leveraging this work in the context of broader priorities can inform the development of electronic information standards for similar core conditions and guide strategic activities in electronic systems.

  10. Fatigue Design and Prevention in Movable Scaffolding Systems

    Directory of Open Access Journals (Sweden)

    Coelho Hugo

    2017-06-01

    Full Text Available The Movable Scaffolding System (MSS is a heavy construction equipment used for casting situ of concrete bridge decks. In the past decades, MSSs have become increasingly complex and industrialized, enlarging its span ranges, incorporating auxiliary elevation machinery and increasing productivity. The tendency nowadays is for strong reutilization and the notion of MSS as a disposable or temporary structure is somehow reductive. The main structure of MSSs may be potentially exposed to fatigue, usually characterized by low number of cycles with significant stress amplitude. Fatigue may be prevented through adequate design; judicious selection of materials; demanding quality control and implementation of robust inspection and maintenance plans.

  11. Fatigue Design and Prevention in Movable Scaffolding Systems

    Science.gov (United States)

    Coelho, Hugo; Torres, Alberto; Pacheco, Pedro; Moreira, Cristiano; Silva, Rute; Soares, José M.; Pinto, Dânia

    2017-06-01

    The Movable Scaffolding System (MSS) is a heavy construction equipment used for casting situ of concrete bridge decks. In the past decades, MSSs have become increasingly complex and industrialized, enlarging its span ranges, incorporating auxiliary elevation machinery and increasing productivity. The tendency nowadays is for strong reutilization and the notion of MSS as a disposable or temporary structure is somehow reductive. The main structure of MSSs may be potentially exposed to fatigue, usually characterized by low number of cycles with significant stress amplitude. Fatigue may be prevented through adequate design; judicious selection of materials; demanding quality control and implementation of robust inspection and maintenance plans.

  12. Test-Access Planning and Test Scheduling for Embedded Core-Based System Chips

    OpenAIRE

    Goel, Sandeep Kumar

    2005-01-01

    Advances in the semiconductor process technology enable the creation of a complete system on one single die, the so-called system chip or SOC. To reduce time-to-market for large SOCs, reuse of pre-designed and pre-veried blocks called cores is employed. Like the design style, testing of SOCs can be best approached in a core-based fashion. In order to enable core-based test development, an embedded core should be isolated from its surrounding circuitry and electrical test access from chip pins...

  13. Perceived importance of substance use prevention in juvenile justice: a multi-level analysis.

    Science.gov (United States)

    Sales, Jessica M; Wasserman, Gail; Elkington, Katherine S; Lehman, Wayne; Gardner, Sheena; McReynolds, Larkin; Wiley, Tisha; Knudsen, Hannah

    2018-05-15

    Youth under juvenile justice (JJ) supervision are at high-risk of adverse outcomes from substance use, making prevention important. Few studies have examined prevention-related attitudes of JJ employees, yet such attitudes may be important for implementing prevention programs. Attitudes toward prevention may reflect individual characteristics and organizational contexts. Mixed effects regression was used to analyze data from 492 employees in 36 sites participating in the Juvenile Justice-Translational Research on Interventions for Adolescents in the Legal System (JJ-TRIALS) cooperative agreement. JJ employees' perceived importance of substance use prevention was measured. Staff-level variables included attitudes, job type, and demographic characteristics. Site-level variables focused on use of evidence-based screening tools, prevention programs, and drug testing. On average, JJ employees rated substance use prevention as highly important (mean = 45.9, out of 50). JJ employees generally agreed that preventing substance use was part of their agency's responsibility (mean = 3.8 on scale ranging from 1 to 5). At the site level, 72.2% used an evidence-based screening tool, 22.2% used one or more evidence-based prevention program, and 47.2% used drug testing. Reported importance of prevention was positively associated with site-level use of screening tools and drug testing as well as staff-level attitudes regarding prevention being consistent with the agency's mission. The associations between screening and prevention attitudes suggest that commitment to identifying youth needs may result in greater openness to preventing substance use. Future efforts to implement substance use prevention within JJ agencies charged with supervising youth in the community may benefit from highlighting the fit between prevention and the agency's mission.

  14. Prevention of hospital-acquired pneumonia: European perspective.

    Science.gov (United States)

    Bonten, Marc J M

    2003-12-01

    Several preventive measures for VAP have been empirically tested. There is clear evidence that antibiotic-containing preventive strategies, such as SDD and oropharyngeal decontamination, are very effective in different patient populations. Selection of antibiotic resistance remains the major disadvantage of these strategies, however, limiting its applicability in settings with high levels of antibiotic resistance. This probably precludes the use of these strategies in many American settings, but may allow their use in European countries with much lower endemic levels of resistance. There is little evidence that systemic prophylaxis is effective for the prevention of VAP, and initial studies were associated with resistance problems. Of the non antibiotic-containing preventive strategies, subglottic aspiration was effective in several studies, whereas other strategies, such as immunonutrition with glutamine or the semirecumbent patient position, were effective in single studies. All these studies were executed in European ICUs. For these interventions, more data are needed on the generalizability, feasibility, and cost effectiveness. Few data support the use of sucralfate for stress ulcer prophylaxis and modulation of enteral nutrition practices as preventive measures for VAP.

  15. Caustic addition system operability test procedure

    International Nuclear Information System (INIS)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  16. Caustic addition system operability test procedure

    Energy Technology Data Exchange (ETDEWEB)

    Parazin, R.E.

    1994-11-01

    This test procedure provides instructions for performing operational testing of the major components of the 241-AN-107 Caustic Addition System by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E).

  17. Design and construction of engineering test device of a multi-purpose radwaste incineration system

    International Nuclear Information System (INIS)

    Wang Peiyi; Zhou Lianquan; Ma Mingxie; Qiu Mingcai; Yang Liguo; Li Xiaohai; Zhang Xiaobin; Lu Xiaowu; Dong Jingling; Wang Xujin; Li Chuanlian; Yang Baomin

    2002-01-01

    The author describes designs of main un-standard devices, monitoring system and safety system, as well as construction of the engineering system devices for a multi-purpose radwaste incineration system. Un-standard devices include waste crusher, pyrolysis furnace, incinerator furnace, cool stream dilution device and bag filter, etc. The monitoring system mainly includes industrial controlled computer, supported by conventional electrical equipment and instruments. Designs of system safety takes account of containment of radioactive materials fire-prevention, explosion prevention, anti-corrosion, redundance and reservation, emergency system, controlling and electric safety system, etc. Results show that main technological system remains good airtight with leakage ratio at 0.67%

  18. Software Sub-system in Loading Automatic Test System for the Measurement of Power Line Filters

    Directory of Open Access Journals (Sweden)

    Yu Bo

    2017-01-01

    Full Text Available The loading automatic test system for measurement of power line filters are in urgent demand. So the software sub-system of the whole test system was proposed. Methods: structured the test system based on the virtual instrument framework, which consisted of lower and up computer and adopted the top down approach of design to perform the system and its modules, according to the measurement principle of the test system. Results: The software sub-system including human machine interface, data analysis and process software, expert system, communication software, control software in lower computer, etc. had been designed. Furthermore, it had been integrated into the entire test system. Conclusion: This sub-system provided a fiendly software platform for the whole test system, and had many advantages such as strong functions, high performances, low prices. It not only raises the test efficiency of EMI filters, but also renders some creativities.

  19. 21 CFR 862.1515 - Nitrogen (amino-nitrogen) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Nitrogen (amino-nitrogen) test system. 862.1515... Systems § 862.1515 Nitrogen (amino-nitrogen) test system. (a) Identification. A nitrogen (amino-nitrogen) test system is a device intended to measure amino acid nitrogen levels in serum, plasma, and urine...

  20. An optimal dynamic interval preventive maintenance scheduling for series systems

    International Nuclear Information System (INIS)

    Gao, Yicong; Feng, Yixiong; Zhang, Zixian; Tan, Jianrong

    2015-01-01

    This paper studies preventive maintenance (PM) with dynamic interval for a multi-component system. Instead of equal interval, the time of PM period in the proposed dynamic interval model is not a fixed constant, which varies from interval-down to interval-up. It is helpful to reduce the outage loss on frequent repair parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency, when compared to a periodic PM scheme. According to the definition of dynamic interval, the reliability of system is analyzed from the failure mechanisms of its components and the different effects of non-periodic PM actions on the reliability of the components. Following the proposed model of reliability, a novel framework for solving the non-periodical PM schedule with dynamic interval based on the multi-objective genetic algorithm is proposed. The framework denotes the strategies include updating strategy, deleting strategy, inserting strategy and moving strategy, which is set to correct the invalid population individuals of the algorithm. The values of the dynamic interval and the selections of PM action for the components on every PM stage are determined by achieving a certain level of system availability with the minimum total PM-related cost. Finally, a typical rotary table system of NC machine tool is used as an example to describe the proposed method. - Highlights: • A non-periodic preventive maintenance scheduling model is proposed. • A framework for solving the non-periodical PM schedule problem is developed. • The interval of non-periodic PM is flexible and schedule can be better adjusted. • Dynamic interval leads to more efficient solutions than fixed interval does

  1. Supernatant treatment system design through testing

    International Nuclear Information System (INIS)

    Ploetz, D.K.; Leonard, I.M.

    1988-12-01

    The main purpose of the Supernatant Treatment System (STS) is to remove more than 99.9 percent of the radioactive cesium (Cs-137) from the high-level waste stored in tank 8D-2. Cesium removal is accomplished in the STS by processing the supernatant (liquid) portion of the high-level waste through three or four ion exchange columns filled with zeolite. After treatment in the STS, the decontaminated supernatant is processed as low-level waste and finally encapsulated in cement for eventual disposal. The Cs-137 removed from the waste and absorbed onto zeolite ion exchange material is temporarily stored in tank 8D-1 until it can be encapsulated in glass and disposed of as high-level waste. This report discusses construction and testing of the STS. Design of the STS was started in 1982 in parallel with the selection of the ion exchange material. The construction of this system was accomplished in five phase in parallel with completion of design to allow for faster completion of the project. The existing high-level waste storage tanks -- 8D-1, 8D-2, and 8D-3 -- required major renovations to permit transfer of the high-level waste from tank 8D-2 to tank 8D-1, to house the components that comprise the STS in tank 8D-1, and to store decontaminated wastes in tank 8D-3. Testing in the STS started before construction was complete and was accomplished by first testing components individually. Then the system was retested using simulated supernatant. Integrated testing of the whole Integrated Radwaste Treatment System (IRTS), which includes the STS, Liquid Waste Treatment System (LWTS), Cement Solidification System (CSS), and the Drum Cell, was also performed using simulated supernatant. Finally, slightly radioactive condensate water from tank 8D-1 was processed. After successfully completing this testing, the STS started operations with radioactive supernatant on May 23, 1988. 21 refs., 33 figs., 21 tabs

  2. Test plan for qualification testing of the 241-SY-101 Flexible Receiver System

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    A mixer pump was installed in tank 241-SY-101 on July 3, 1993, to support hydrogen mitigation testing. This test mixer pump has proven to be very successful in mitigating the large gas releases, or ''burps,'' from the tank waste. Therefore, a decision has been made to fabricate a spare pump that will be installed upon failure of the existing test pump. Before replacement activities can be initiated, equipment must be available to remove the existing pump. A pump removal system is currently being designed and fabricated that will support the retrieval, transportation and disposal of the existing pump. The Equipment Removal System consists of six major components: the flexible receiver system (FRS), the equipment storage container, the container strongback system, the container transport trailer, the support cranes, and the pump washdown system

  3. Cervical Cancer is Preventable! PSA (:60)

    Centers for Disease Control (CDC) Podcasts

    This 60 second Public Service Announcement is based on the November 2014 CDC Vital Signs report. Every visit to a doctor or nurse is an opportunity to prevent cervical cancer. Women can get a Pap test and HPV test to help prevent cervical cancer and adolescent boys and girls can get the HPV vaccination series to help prevent cervical and other cancers.

  4. Testing and reference model analysis of FTTH system

    Science.gov (United States)

    Feng, Xiancheng; Cui, Wanlong; Chen, Ying

    2009-08-01

    With rapid development of Internet and broadband access network, the technologies of xDSL, FTTx+LAN , WLAN have more applications, new network service emerges in endless stream, especially the increase of network game, meeting TV, video on demand, etc. FTTH supports all present and future service with enormous bandwidth, including traditional telecommunication service, traditional data service and traditional TV service, and the future digital TV and VOD. With huge bandwidth of FTTH, it wins the final solution of broadband network, becomes the final goal of development of optical access network.. Fiber to the Home (FTTH) will be the goal of telecommunications cable broadband access. In accordance with the development trend of telecommunication services, to enhance the capacity of integrated access network, to achieve triple-play (voice, data, image), based on the existing optical Fiber to the curb (FTTC), Fiber To The Zone (FTTZ), Fiber to the Building (FTTB) user optical cable network, the optical fiber can extend to the FTTH system of end-user by using EPON technology. The article first introduced the basic components of FTTH system; and then explain the reference model and reference point for testing of the FTTH system; Finally, by testing connection diagram, the testing process, expected results, primarily analyze SNI Interface Testing, PON interface testing, Ethernet performance testing, UNI interface testing, Ethernet functional testing, PON functional testing, equipment functional testing, telephone functional testing, operational support capability testing and so on testing of FTTH system. ...

  5. Vital Signs-Cervical Cancer is Preventable!

    Centers for Disease Control (CDC) Podcasts

    2014-11-05

    This podcast is based on the November 2014 CDC Vital Signs report. Every visit to a doctor or nurse is an opportunity to prevent cervical cancer. Women can get a Pap test and HPV test to help prevent cervical cancer and adolescent boys and girls can get the HPV vaccination series to help prevent cervical and other cancers.  Created: 11/5/2014 by National Center for Chronic Disease Prevention and Health Promotion (NCCDPHP).   Date Released: 11/5/2014.

  6. 21 CFR 862.3080 - Breath nitric oxide test system.

    Science.gov (United States)

    2010-04-01

    ... Systems § 862.3080 Breath nitric oxide test system. (a) Identification. A breath nitric oxide test system... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Breath nitric oxide test system. 862.3080 Section... fractional nitric oxide concentration in expired breath aids in evaluating an asthma patient's response to...

  7. 21 CFR 862.1640 - Protein-bound iodine test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Protein-bound iodine test system. 862.1640 Section... Systems § 862.1640 Protein-bound iodine test system. (a) Identification. A protein-bound iodine test system is a device intended to measure protein-bound iodine in serum. Measurements of protein-bound...

  8. Design and simulations for RFPI system test jig

    International Nuclear Information System (INIS)

    Keshwani, Rajesh; Khole, Shailesh; Sujo, C.I.; Shukla, Hitesh; Afaash, M.; Bharade, Sandeep; Joshi, Gopal

    2015-01-01

    RFPI system for condition monitoring and protection of RF systems of LEHIPA has been designed. The intention of this system is to protect and monitor different high power RF components. The system consists of variety of analog and digital cards to process, acquire and monitor signals from RF sensors, photo multiplier tubes (PMT), field emission probes, photo sensors, etc. The system can also accept and process digital inputs or contacts and analog input signals from other subsystems, indicating their status. It comprises of analog signal processing electronics, condition monitoring, data acquisition and fault reporting features. Since RFPI system should process and take action within prescribed time limit, the testing of system is critical issue. In order to carry out stand-alone field testing of such elaborate electronic system, variety of carefully designed electronic test circuit with suitable rangeability is required. These include fast current sources, fast amplifiers, fast rectifiers, etc. This paper elaborates on specifications, design approach, circuit design and simulations for various circuits used in test jig

  9. Aviation Systems Test and Integration Lab (AvSTIL)

    Data.gov (United States)

    Federal Laboratory Consortium — The Aviation Systems Test and Integration Laboratory offers an innovative approach to aviation system and subsystem testing by fully immersing aviation platforms in...

  10. Pelamis WEC - full-scale joint system test

    Energy Technology Data Exchange (ETDEWEB)

    Yemm, R.

    2003-07-01

    This report describes the building and testing of a full-scale Pelamis Wave Energy Converter (WEC) two-axis joint system using a laboratory joint test rig. The main project objective to develop an intermediate demonstration model to confirm full scale control, hydraulic and data acquisition systems is discussed, and the key objectives of the programme are listed. Details are given of the semi-submerged articulated structure of cylindrical elements linked by hinged joints, and the integrated testing of all key components. A summary of the work programme and a description of the test rig are presented.

  11. QUASI-RANDOM TESTING OF COMPUTER SYSTEMS

    Directory of Open Access Journals (Sweden)

    S. V. Yarmolik

    2013-01-01

    Full Text Available Various modified random testing approaches have been proposed for computer system testing in the black box environment. Their effectiveness has been evaluated on the typical failure patterns by employing three measures, namely, P-measure, E-measure and F-measure. A quasi-random testing, being a modified version of the random testing, has been proposed and analyzed. The quasi-random Sobol sequences and modified Sobol sequences are used as the test patterns. Some new methods for Sobol sequence generation have been proposed and analyzed.

  12. Systems to prevent nuclear material from re-entering the biosphere

    International Nuclear Information System (INIS)

    Buden, D.; Angelo, J.A. Jr.; Lapin, S.

    1992-01-01

    Nuclear systems are key to the success of many space missions as we have witness in the Apollo science packages, Viking Mars landers, and Pioneer and Voyager planetary exploration missions. There is always a concern that nuclear materials will re-enter the biosphere from a mission abort. In fact, this has happened for radioisotope and reactor power systems. Until now, the emphasize has been an incorporating on-board means to protect the biosphere. With possible increased use of nuclear power and propulsion systems in space, Project SIREN (Search, Intercept, Retrieve, Expulsion, Nuclear) has determined that external means can be used as a back up to current on-board systems to provide assured prevention of nuclear materials from re-entry once in space. The technology base to implement a SIREN vehicle has been assessed and a data base and mission analysis program prepared (called THOR) to evaluate various missions. The degree of hazard from existing nuclear power systems in space has been assessed and found to be significant

  13. TTCN-3 for distributed testing embedded systems

    NARCIS (Netherlands)

    Blom, S.C.C.; Deiß, T.; Ioustinova, N.; Kontio, A.; Pol, van de J.C.; Rennoch, A.; Sidorova, N.; Virbitskaite, I.; Voronkov, A.

    2007-01-01

    Abstract. TTCN-3 is a standardized language for specifying and executing test suites that is particularly popular for testing embedded systems. Prior to testing embedded software in a target environment, the software is usually tested in the host environment. Executing in the host environment often

  14. Railcar waste transfer system hydrostatic test report

    International Nuclear Information System (INIS)

    Ellingson, S.D.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per HNF-SD-W417-ATP-001, ''Rail car Waste Transfer System Hydrostatic Test''. The test was completed and approved without any problems or exceptions

  15. Preliminary program evaluation of emergency department HIV prevention counseling.

    Science.gov (United States)

    Sitlinger, Andrea P; Lindsell, Christopher J; Ruffner, Andrew H; Wayne, D Beth; Hart, Kimberly W; Trott, Alexander T; Fichtenbaum, Carl J; Lyons, Michael S

    2011-07-01

    Controversy surrounds the linkage of prevention counseling with emergency department (ED)-based HIV testing. Further, the effectiveness and feasibility of prevention counseling in the ED setting is unknown. We investigate these issues by conducting a preliminarily exploration of several related aspects of our ED's HIV prevention counseling and testing program. Our urban, academic ED provides formal client-centered prevention counseling in conjunction with HIV testing. Five descriptive, exploratory observations were conducted, involving surveys and analysis of electronic medical records and programmatic data focused on (1) patient perception and feasibility of prevention counseling in the ED, (2) patient perceptions of the need to link prevention counseling with testing, and (3) potential effectiveness of providing prevention counseling in conjunction with ED-based HIV testing. Of 110 ED patients surveyed after prevention counseling and testing, 98% believed privacy was adequate, and 97% reported that their questions were answered. Patients stated that counseling would lead to improved health (80%), behavioral changes (72%), follow-up testing (77%), and discussion with partners (74%). However, 89% would accept testing without counseling, 32% were willing to seek counseling elsewhere, and 26% preferred not to receive the counseling. Correct responses to a 16-question knowledge quiz increased by 1.6 after counseling (95% confidence interval 1.3 to 12.0). The program completed counseling for 97% of patients tested; however, 6% of patients had difficulty recalling the encounter and 13% denied received testing. Among patients undergoing repeated testing, there was no consistent change in self-reported risk behaviors. Participants in the ED prevention counseling and testing program considered counseling acceptable and useful, though not required. Given adequate resources, prevention counseling can be provided in the ED, but it is unlikely that all patients benefit

  16. “Project Protect” intervention. Testing a new approach for HIV prevention

    Directory of Open Access Journals (Sweden)

    Vasylyeva, Tetyana

    2012-07-01

    Full Text Available BACKGROUND. “Project Protect” aims to find highly infectious individuals through screening for acute/recent infection cases and prevent HIV transmission in the risk networks of these cases through contact tracing of these networks` participants, distributing community alerts about risk of acute infection among them and accurate post-test counseling.METHODS. An ongoing pilot phase of the intervention began in Kriviy Rig and Lviv, Ukraine in November, 2011. Participants are recruited through: 1 screening for cases of acute/recent infection at voluntary counseling and testing (VCT sites and in partner organizations (including AIDS-Centers which conduct VCT; 2 visits to drug use venues, chain-referral and contact tracing. Genscreen ultra HIV Ag-Ab “special-tests” are used to detect cases of acute infection. Recent infection is defined as positive test result and preceding negative result within 6 months and/or age younger than 21 years old.RESULTS. In the two cities 173 respondents were recruited to the project, 118 special tests were done. No cases of acute infection and eleven cases of recent infection were found (8 injection drug users (IDUs with preceding negative result within 6 months, 2 IDUs younger than 21 recruited by project team; one non-IDU with preceding negative result within 6 months referred from AIDS-Center. Six recent cases were recruited through screening at VCT sites, 5 others through contact tracing. Psychologists conducted 41 interviews with recent infection cases and their risk networks` members; 176 community alert flyers were distributed to members of risk networks during the interview by psychologist, at the venue by social worker and by participants themselves; 3 drug use venues were visited by project team with concomitant HIV-testing of people present at the venue. CONCLUSIONS. Network tracing seems to be feasible and to help find recently infected people. Further research is needed to tell whether this

  17. 21 CFR 866.5640 - Infectious mononucleosis immunological test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Infectious mononucleosis immunological test system....5640 Infectious mononucleosis immunological test system. (a) Identification. An infectious mononucleosis immunological test system is a device that consists of the reagents used to measure by...

  18. HTS power lead testing at the Fermilab magnet test facility

    Energy Technology Data Exchange (ETDEWEB)

    Rabehl, R.; Carcagno, R.; Feher, S.; Huang, Y.; Orris, D.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.; /Fermilab

    2005-08-01

    The Fermilab Magnet Test Facility has tested high-temperature superconductor (HTS) power leads for cryogenic feed boxes to be placed at the Large Hadron Collider (LHC) interaction regions and at the new BTeV C0 interaction region of the Fermilab Tevatron. A new test facility was designed and operated, successfully testing 20 pairs of HTS power leads for the LHC and 2 pairs of HTS power leads for the BTeV experiment. This paper describes the design and operation of the cryogenics, process controls, data acquisition, and quench management systems. Results from the facility commissioning are included, as is the performance of a new insulation method to prevent frost accumulation on the warm ends of the power leads.

  19. HTS power lead testing at the Fermilab magnet test facility

    International Nuclear Information System (INIS)

    Rabehl, R.; Carcagno, R.; Feher, S.; Huang, Y.; Orris, D.; Pischalnikov, Y.; Sylvester, C.; Tartaglia, M.

    2005-01-01

    The Fermilab Magnet Test Facility has tested high-temperature superconductor (HTS) power leads for cryogenic feed boxes to be placed at the Large Hadron Collider (LHC) interaction regions and at the new BTeV CO interaction region of the Fermilab Tevatron. A new test facility was designed and operated, successfully testing 20 pairs of HTS power leads for the LHC and 2 pairs of HTS power leads for the BTeV experiment. This paper describes the design and operation of the cryogenics, process controls, data acquisition, and quench management systems. Results from the facility commissioning are included, as is the performance of a new insulation method to prevent frost accumulation on the warm ends of the power leads

  20. Cervical Cancer is Preventable! PSA (:60)

    Centers for Disease Control (CDC) Podcasts

    2014-11-05

    This 60 second Public Service Announcement is based on the November 2014 CDC Vital Signs report. Every visit to a doctor or nurse is an opportunity to prevent cervical cancer. Women can get a Pap test and HPV test to help prevent cervical cancer and adolescent boys and girls can get the HPV vaccination series to help prevent cervical and other cancers.  Created: 11/5/2014 by National Center for Injury Prevention and Control (NCIPC).   Date Released: 11/5/2014.

  1. Testing of modular industrial solar retrofit industrial process steam systems

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, C.P.; Dudley, V.E.

    1984-06-13

    Under the Department of Energy's Modular Industrial Solar Retrofit project, five industrial process heat systems incorporating line-focus solar collectors were designed and hardware was installed and tested at Sandia National Laboratories and the Solar Energy Research Institute. System designers and collector manufacturers participating in the project included Acurex Solar Corporation, BDM, Inc., Custom Engineering, Inc., Foster Wheeler Solar Development Corporation, Solar Kinetics, Inc., and Suntec Systems, Inc. This paper describes the testing of the qualification test systems which has been under way since mid-1982. Each qualification test system includes an equipment skid sufficient to support a collector field of 2300 m/sup 2/ aperture and one delta-tempeature string of from 175 to 460 m/sup 2/ aperture. Each system is capable of producing saturated steam at 1.7 MPa and operates at maximum outlet temperatures of from 250 to 290/sup 0/C. The test series includes function and safety tests to determine that the systems operate as specified, an unattended operation test of at least two weeks duration, performance tests to allow prediction of annual system performance, and life cycle tests to evaluate component lifetime and maintenance requirements. Since the start of testing, some twenty five modifications have been made to the various systems for the purpose of improving system performance and/or reliability, and appropriate tests of these modifictions have been made or are underway. This paper presents a description of the approach to testing of the MISR systems and selected test results.

  2. Diversity and testing requirements of programmable automation systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.

    1993-04-01

    In the report programmable digital operation and safety automation systems for nuclear power plants are discussed. The programmable systems deviate by their properties and behaviour from the conventional non-programmable systems in such extent, that their verification and validation for safety critical applications requires new methods and practices. The safety assessment can not be based on conventional probabilistic methods due to the difficulties in the quantification of the reliability of the software and hardware. A safety critical programmable system shall include diverse redundant parts so that no residual program fault can not cause the failure of the intended function of the system. Although complete testing of a programmable system is impossible, different tests have a central role in the production and validation process of the system. Diversity is important also in confidence building measures for the implemented system. Independent analysis and testing of the system should use different methods and tools from those used in the production and validation process by the system vendor. Use of diversity and testing are concluded to be central issues in producing safe programmable system and in proving them to be safe enough. By combining functional and programming diversity in a suitable way one can produce a system that is safe enough without having a non-programmable back-up system. (48 refs., 10 figs., 2 tabs.)

  3. Evaluating the reliability of an injury prevention screening tool: Test-retest study.

    Science.gov (United States)

    Gittelman, Michael A; Kincaid, Madeline; Denny, Sarah; Wervey Arnold, Melissa; FitzGerald, Michael; Carle, Adam C; Mara, Constance A

    2016-10-01

    A standardized injury prevention (IP) screening tool can identify family risks and allow pediatricians to address behaviors. To assess behavior changes on later screens, the tool must be reliable for an individual and ideally between household members. Little research has examined the reliability of safety screening tool questions. This study utilized test-retest reliability of parent responses on an existing IP questionnaire and also compared responses between household parents. Investigators recruited parents of children 0 to 1 year of age during admission to a tertiary care children's hospital. When both parents were present, one was chosen as the "primary" respondent. Primary respondents completed the 30-question IP screening tool after consent, and they were re-screened approximately 4 hours later to test individual reliability. The "second" parent, when present, only completed the tool once. All participants received a 10-dollar gift card. Cohen's Kappa was used to estimate test-retest reliability and inter-rater agreement. Standard test-retest criteria consider Kappa values: 0.0 to 0.40 poor to fair, 0.41 to 0.60 moderate, 0.61 to 0.80 substantial, and 0.81 to 1.00 as almost perfect reliability. One hundred five families participated, with five lost to follow-up. Thirty-two (30.5%) parent dyads completed the tool. Primary respondents were generally mothers (88%) and Caucasian (72%). Test-retest of the primary respondents showed their responses to be almost perfect; average 0.82 (SD = 0.13, range 0.49-1.00). Seventeen questions had almost perfect test-retest reliability and 11 had substantial reliability. However, inter-rater agreement between household members for 12 objective questions showed little agreement between responses; inter-rater agreement averaged 0.35 (SD = 0.34, range -0.19-1.00). One question had almost perfect inter-rater agreement and two had substantial inter-rater agreement. The IP screening tool used by a single individual had excellent

  4. Performance evaluation of multi-state degraded systems with minimal repairs and imperfect preventive maintenance

    International Nuclear Information System (INIS)

    Soro, Isaac W.; Nourelfath, Mustapha; Ait-Kadi, Daoud

    2010-01-01

    In this paper, we develop a model for evaluating the availability, the production rate and the reliability function of multi-state degraded systems subjected to minimal repairs and imperfect preventive maintenance. The status of the system is considered to degrade with use. These degradations may lead to decrease in the system efficiency. It is assumed that the system can consecutively degrade into several discrete states, which are characterized by different performance rates, ranging from perfect functioning to complete failure. The latter is observed when the degradation level reaches a certain critical threshold such as the system efficiency may decrease to an unacceptable limit. In addition, the system can fail randomly from any operational or acceptable state and can be repaired. This repair action brings the system to its previous operational state without affecting its failure rate (i.e., minimal repair). The used preventive maintenance policy suggests that if the system reaches the last acceptable degraded state, it is brought back to one of the states with higher efficiency. Considering customer demand as constant, the system is modeled as a continuous-time Markov process to assess its instantaneous and stationary performance measures. A numerical example is given to illustrate the proposed model.

  5. Spaceport Command and Control System User Interface Testing

    Science.gov (United States)

    Huesman, Jacob

    2016-01-01

    The Spaceport Command and Control System will be the National Aeronautics and Space Administration's newest system for launching commercial and government owned spacecraft. It's a large system with many parts all in need of testing. To improve upon testing already done by NASA engineers, the Engineering Directorate, Electrical Division (NE-E) of Kennedy Space Center has hired a group of interns each of the last few semesters to develop novel ways of improving the testing process.

  6. The challenge of staying happier: testing the Hedonic Adaptation Prevention model.

    Science.gov (United States)

    Sheldon, Kennon M; Lyubomirsky, Sonja

    2012-05-01

    The happiness that comes from a particular success or change in fortune abates with time. The Hedonic Adaptation Prevention (HAP) model specifies two routes by which the well-being gains derived from a positive life change are eroded--the first involving bottom-up processes (i.e., declining positive emotions generated by the positive change) and the second involving top-down processes (i.e., increased aspirations for even more positivity). The model also specifies two moderators that can forestall these processes--continued appreciation of the original life change and continued variety in change-related experiences. The authors formally tested the predictions of the HAP model in a 3-month three-wave longitudinal study of 481 students. Temporal path analyses and moderated regression analyses provided good support for the model. Implications for the stability of well-being, the feasibility of "the pursuit of happiness," and the appeal of overconsumption are discussed.

  7. Testing of a Wireless Sensor System for Instrumented Thermal Protection Systems

    Science.gov (United States)

    Kummer, Allen T.; Weir, Erik D.; Morris, Trey J.; Friedenberger, Corey W.; Singh, Aseem; Capuro, Robert M.; Bilen, Sven G.; Fu, Johnny; Swanson, Gregory T.; Hash, David B.

    2011-01-01

    Funded by NASA's Constellation Universities Institutes Project (CUIP), we have been developing and testing a system to wirelessly power and collect data from sensors on space platforms in general and, in particular, the harsh environment of spacecraft re-entry. The elimination of wires and associated failures such as chafing, sparking, ageing, and connector issues can increase reliability and design flexibility while reducing costs. These factors present an appealing case for the pursuit of wireless solutions for harsh environments, particularly for their use in space and on spacecraft. We have designed and built a prototype wireless sensor system. The system, with capabilities similar to that of a wired sensor system, was tested in NASA Ames Research Center s Aerodynamic Heating Facility and Interaction Heating Facility. This paper discusses the overall development effort, testing results, as well as future directions.

  8. Crime-prevention

    DEFF Research Database (Denmark)

    Brønsted, Lone

    In Denmark, crime prevention is embedded in state professional practices in kindergartens, schools and youth clubs. These welfare institutions are conceived as safe places that safeguard children and young people through inclusive learning environments, warm and empathic relationships between......-sectional cooperation called “SSP”. SSP is a locally anchored cooperation of the school (S), the social services (S) and the police (P) and its aim is to create a coordinated system of prevention, e.g., to prevent crime or school drop outs. In continuation of this, crime preventive work is understood as a practice...

  9. Tritium Systems Test Facility. Volume I

    International Nuclear Information System (INIS)

    Anderson, G.W.; Battleson, K.W.; Bauer, W.

    1976-10-01

    Sandia Laboratories proposes to build and operate a Tritium Systems Test Facility (TSTF) in its newly completed Tritium Research Laboratory at Livermore, California (see frontispiece). The facility will demonstrate at a scale factor of 1:200 the tritium fuel cycle systems for an Experimental Power Reactor (EPR). This scale for each of the TSTF subsystems--torus, pumping system, fuel purifier, isotope separator, and tritium store--will allow confident extrapolation to EPR dimensions. Coolant loop and reactor hall cleanup facilities are also reproduced, but to different scales. It is believed that all critical details of an EPR tritium system will be simulated correctly in the facility. Tritium systems necessary for interim devices such as the Ignition Test Reactor (ITR) or The Next Step (TNS) can also be simulated in TSTF at other scale values. The active tritium system will be completely enclosed in an inert atmosphere glove box which will be connected to the existing Gas Purification System (GPS) of the Tritium Research Laboratory. In effect, the GPS will become the scaled environmental control system which otherwise would have to be built especially for the TSTF

  10. Integration Tests of the Muon System

    CERN Multimedia

    Cerutti, F; Palestini, S

    A complex large-size prototype of the Muon system is installed in the test area H8B in Prévessin; the set-up includes chambers belonging to the three layers of the Barrel Spectrometer (on the right in Figure 1), and chambers belonging to one octant of the End Cap Spectrometer (center and left side of Figure 1). Figure 1: Set-up of the Muon spectrometer integration test. The installation accurately reproduces the geometry of regions of the ATLAS Muon Spectrometer, with the H8 beam-line crossing the detectors at positions/angles corresponding to particles with polar angle of 75 ± 4 and 15 ± 4 degrees, respectively for the Barrel and the End Cap. A comprehensive test program is being carried out with this set-up, ranging from tests of support frames (octant of the MDT BigWheel and of the SmallWheel) and of handling/installation of tracking chambers, to real-size tests of the alignment systems, together with accurate studies of performance and calibration of the precision chambers, and with develo...

  11. Development of a Real-Time Environmental Monitoring System, Life Cycle Assessment Systems, and Pollution Prevention Programs

    Science.gov (United States)

    Kocher, Walter M.

    2003-01-01

    Pollution prevention (P2) opportunities and Greening the Government (GtG) activities, including the development of the Real-Time Environmental Monitoring System (RTEMS), are currently under development at the NASA Glenn Research Center. The RTEMS project entails the ongoing development of a monitoring system which includes sensors, instruments, computer hardware and software, plus a data telemetry system.Professor Kocher has been directing the RTEMS project for more than 3 years, and the implementation of the prototype system at GRC will be a major portion of his summer effort. This prototype will provide mulitmedia environmental monitoring and control capabilities, although water quality and air emissions will be the immediate issues addressed this summer. Applications beyond those currently identified for environmental purposes will also be explored.

  12. A semiautomated computer-interactive dynamic impact testing system

    International Nuclear Information System (INIS)

    Alexander, D.J.; Nanstad, R.K.; Corwin, W.R.; Hutton, J.T.

    1989-01-01

    A computer-assisted semiautomated system has been developed for testing a variety of specimen types under dynamic impact conditions. The primary use of this system is for the testing of Charpy specimens. Full-, half-, and third-size specimens have been tested, both in the lab and remotely in a hot cell for irradiated specimens. Specimens are loaded into a transfer device which moves the specimen into a chamber, where a hot air gun is used to heat the specimen, or cold nitrogen gas is used for cooling, as required. The specimen is then quickly transferred from the furnace to the anvils and then broken. This system incorporates an instrumented tup to determine the change in voltage during the fracture process. These data are analyzed by the computer system after the test is complete. The voltage-time trace is recorded with a digital oscilloscope, transferred to the computer, and analyzed. The analysis program incorporates several unique features. It interacts with the operator and identifies the maximum voltage during the test, the amount of rapid fracture during the test (if any), and the end of the fracture process. The program then calculates the area to maximum voltage and the total area under the voltage-time curve. The data acquisition and analysis part of the system can also be used to conduct other dynamic testing. Dynamic tear and precracked specimens can be tested with an instrumented tup and analyzed in a similar manner. 3 refs., 7 figs

  13. Optimal preventive maintenance and repair policies for multi-state systems

    International Nuclear Information System (INIS)

    Sheu, Shey-Huei; Chang, Chin-Chih; Chen, Yen-Luan; George Zhang, Zhe

    2015-01-01

    This paper studies the optimal preventive maintenance (PM) policies for multi-state systems. The scheduled PMs can be either imperfect or perfect type. The improved effective age is utilized to model the effect of an imperfect PM. The system is considered as in a failure state (unacceptable state) once its performance level falls below a given customer demand level. If the system fails before a scheduled PM, it is repaired and becomes operational again. We consider three types of major, minimal, and imperfect repair actions, respectively. The deterioration of the system is assumed to follow a non-homogeneous continuous time Markov process (NHCTMP) with finite state space. A recursive approach is proposed to efficiently compute the time-dependent distribution of the multi-state system. For each repair type, we find the optimal PM schedule that minimizes the average cost rate. The main implication of our results is that in determining the optimal scheduled PM, choosing the right repair type will significantly improve the efficiency of the system maintenance. Thus PM and repair decisions must be made jointly to achieve the best performance

  14. The particle swarm optimization algorithm applied to nuclear systems surveillance test planning

    International Nuclear Information System (INIS)

    Siqueira, Newton Norat

    2006-12-01

    This work shows a new approach to solve availability maximization problems in electromechanical systems, under periodic preventive scheduled tests. This approach uses a new Optimization tool called PSO developed by Kennedy and Eberhart (2001), Particle Swarm Optimization, integrated with probabilistic safety analysis model. Two maintenance optimization problems are solved by the proposed technique, the first one is a hypothetical electromechanical configuration and the second one is a real case from a nuclear power plant (Emergency Diesel Generators). For both problem PSO is compared to a genetic algorithm (GA). In the experiments made, PSO was able to obtain results comparable or even slightly better than those obtained b GA. Therefore, the PSO algorithm is simpler and its convergence is faster, indicating that PSO is a good alternative for solving such kind of problems. (author)

  15. Testing power system controllers by real-time simulation

    DEFF Research Database (Denmark)

    Venne, Philippe; Guillaud, Xavier; Sirois, Frédéric

    2007-01-01

    In this paper, we present a number of state-of-the art methods for testing power system controllers based on the use of a real-time power system simulator. After introducing Hypersim, we list and discuss the different means of connection between the controller under tests and the power system...

  16. An Intelligent Tutoring System for Nondestructive Testing Training

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. K.; Koh, S. N. [Joong Ang Inspection Co., Seoul (Korea, Republic of); Kim, M. K.; Shim, Y. J. [Ajou University, Suwon (Korea, Republic of)

    1998-02-15

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing

  17. An Intelligent Tutoring System for Nondestructive Testing Training

    International Nuclear Information System (INIS)

    Kim, J. K.; Koh, S. N.; Kim, M. K.; Shim, Y. J.

    1998-01-01

    This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing

  18. 21 CFR 862.3580 - Lysergic acid diethylamide (LSD) test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Lysergic acid diethylamide (LSD) test system. 862... Test Systems § 862.3580 Lysergic acid diethylamide (LSD) test system. (a) Identification. A lysergic acid diethylamide (LSD) test system is a device intended to measure lysergic acid diethylamide, a...

  19. SCT module testing system at Charles University in Prague

    CERN Document Server

    Broklova, Z; Dolezal, Z; Kodys, P; Kubik, P; Reznicek, P

    2003-01-01

    Detector control system (DCS) is built up to ensure adequate environment conditions during mass testing of silicon strip modules for ATLAS Inner Detector. DCS protects modules against damage and simplifies the whole testing procedure as well. In the automatic mode, the system measures several environmental parameters and checks them. In case of accident or unexpected situation, it alerts operator of the system (for example via email). It can safely stop all testing. The system also contains components for remote observation plus control of the testing status.

  20. Nightly Test system migration

    CERN Document Server

    Win-Lime, Kevin

    2013-01-01

    The summer student program allows students to participate to the Cern adventure. They can follow several interesting lectures about particle science and participate to the experiment work. As a summer student, I had worked for LHCb experiment. LHCb uses a lot of software to analyze its data. All this software is organized in packages and projects. They are built and tested during the night using an automated system and the results are displayed on a web interface. Actually, LHCb is changing this system. It is looking for a replacement candidate. So I was charged to unify some internal interfaces to permit a swift migration. In this document, I will describe shortly the system used by LHCb, then I will explain what I have done in detail.

  1. An Intelligent FPGA Based Anti-Sweating System for Bed Sore Prevention in a Clinical Environment

    Directory of Open Access Journals (Sweden)

    K. S. Jaichandar

    2011-01-01

    Full Text Available Bed sores, a common problem among immobile patients occur as a result of continuous sweating due to increase in skin to bed surface temperature in patients lying on same posture for prolonged period. If left untreated, the skin can break open and become infected. Currently adopted methods for bed sores prevention include: use of two hourly flip chat for repositioning patient or use of air fluidized beds. However, the setbacks of these preventive measures include either use of costly equipment or wastage of human resources. This paper introduces an intelligent low cost FPGA based anti-sweating system for bed sores prevention in a clinical environment. The developed system consists of bed surface implanted temperature sensors interfaced with an FPGA chip for sensing the temperature change in patient’s skin to bed surface. Based on the temperature change, the FPGA chip select the - mode (heater/cooler and speed of the fan module. Furthermore, an alarm module was implemented to alert the nurse to reposition the patient only if patient’s skin to bed surface temperature exceeds a predefined threshold thereby saving human resources. By integrating the whole system into a single FPGA chip, we were able to build a low cost compact system without sacrificing processing power and flexibility.

  2. Testing of a new morphing trailing edge flap system on a novel outdoor rotating test rig

    DEFF Research Database (Denmark)

    Aagaard Madsen, Helge; Barlas, Athanasios; Løgstrup Andersen, Tom

    2015-01-01

    The morphing trailing edge system or flap system, CRTEF, has been developed over the last 10 years at DTU Wind Energy. After a promising wind tunnel test of the system in 2009 the INDUFLAP project has been carried out from 2011-2014 to transfer the technology from laboratory to industrial...... manufacturing and application. To narrow the gap between wind tunnel testing and full scale prototype testing we developed the rotating test rig. The overall objectives with the rotating test rig are: 1) to test the flap system in a realistic rotating environment with a realistic g-loading; 2) to measure...... the flap performance in real turbulent inflow and 3) to test the flap system in a realistic size and Reynolds number when comparing with full scale applications.. The rotating test rig consists of a 2.2m blade section attached to a 10m boom and mounted on a 100kW turbine platform. It was installed in June...

  3. 21 CFR 862.3250 - Cocaine and cocaine metabolite test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cocaine and cocaine metabolite test system. 862... Test Systems § 862.3250 Cocaine and cocaine metabolite test system. (a) Identification. A cocaine and cocaine metabolite test system is a device intended to measure cocaine and a cocaine metabolite...

  4. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    Science.gov (United States)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  5. CMS Forward Pixel Upgrade Electronics and System Testing

    CERN Document Server

    Weber, Hannsjorg Artur

    2016-01-01

    This note discusses results of electronics and system testing of the CMS forward pixel (FPIX) detector upgrade for Phase 1. The FPIX detector is comprised of four stand-alone half cylinders, each of which contains frontend readout electronic boards, power regulators, cables and fibers in addition to the pixel modules. All of the components undergo rigorous testing and quality assurance before assembly into the half cylinders. Afterwards, we perform full system tests on the completely assembled half cylinders, including calibrations at final operating temperatures, characterization of the realistic readout chain, and system grounding and noise studies. The results from all these tests are discussed.

  6. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  7. Legacy Vehicle Fuel System Testing with Intermediate Ethanol Blends

    Energy Technology Data Exchange (ETDEWEB)

    Davis, G. W.; Hoff, C. J.; Borton, Z.; Ratcliff, M. A.

    2012-03-01

    The effects of E10 and E17 on legacy fuel system components from three common mid-1990s vintage vehicle models (Ford, GM, and Toyota) were studied. The fuel systems comprised a fuel sending unit with pump, a fuel rail and integrated pressure regulator, and the fuel injectors. The fuel system components were characterized and then installed and tested in sample aging test rigs to simulate the exposure and operation of the fuel system components in an operating vehicle. The fuel injectors were cycled with varying pulse widths during pump operation. Operational performance, such as fuel flow and pressure, was monitored during the aging tests. Both of the Toyota fuel pumps demonstrated some degradation in performance during testing. Six injectors were tested in each aging rig. The Ford and GM injectors showed little change over the aging tests. Overall, based on the results of both the fuel pump testing and the fuel injector testing, no major failures were observed that could be attributed to E17 exposure. The unknown fuel component histories add a large uncertainty to the aging tests. Acquiring fuel system components from operational legacy vehicles would reduce the uncertainty.

  8. The role of a company’s internal control system in fraud prevention

    Directory of Open Access Journals (Sweden)

    Dragomir Dimitrijevic

    2016-01-01

    Full Text Available The emergence of internal control over specific segments of activities has been associated with management needs for evaluation of the consistency between the actual situation and development targets. Monitoring activities should enable detection and timely reaction to possible target-related deviations. While responding to complex market needs, companies are exposed to numerous internal and external influences, some of which may cause significant damage. Companies have realized that it is safer and cheaper to establish their own internal control systems in order to prevent such influences. The aim of this work is to show how the overall quality of control and The emergence of internal control over specific segments of activities has been associated with management needs for evaluation of the consistency between the actual situation and development targets. Monitoring activities should enable detection and timely reaction to possible target-related deviations. While responding to complex market needs, companies are exposed to numerous internal and external influences, some of which may cause significant damage. Companies have realized that it is safer and cheaper to establish their own internal control systems in order to prevent such influences. The aim of this work is to show how the overall quality of control and company performance is improved through implementation of preventive methods by internal controls, and to indicate that a developed system of internal control represents a protective barrier against various kinds of data manipulation and fraud inside the companies. Special attention was paid to fraud in financial statements since it can cause the most serious damage leading to instability of the economic-financial environment.

  9. Novel Double-Needle System That Can Prevent Intravascular Injection of Any Filler

    Directory of Open Access Journals (Sweden)

    Hsiang Huang, MD

    2017-09-01

    Full Text Available Summary:. A new type of needle system combines 2 parts, an inner needle and an outer needle. The inner needle is used for filler injection and the outer needle acts as a guiding needle that can observe blood reflow when inserting into the vessel lumen during injection process. This new needle system can be used for all kinds of filler, providing real time monitoring for physician and preventing intravascular injection of any filler.

  10. Applications of the automatic ultrasonic testing system ALOK combined with a phased array system

    International Nuclear Information System (INIS)

    Stanger, H.K.; Kappes, W.; Licht, R.; Bohn, H.; Barbian, O.A.

    1987-01-01

    The combination of the automatic testing system ALOK with a controlled probe in the form of a phased array device is a possibility to meet the high requirements on the test method with regard to the statements of the test as well as the requirements on the reduction of operation and preparation times. The system's applications are not limited to the testing of reactors in nuclear technology (basic tests and recurring tests of the RPV and other primary circuit components); they are also of great importance in the non-nuclear sector e.g. the testing of pipelines, of reactors in the chemical field and of offshore structures as well as tests of components in the field of production. The modularity of the system permits an adaptation to the particular testing task with the possibility of using different manipulation and hardware systems. (orig./DG) [de

  11. Light-emitting device test systems

    Science.gov (United States)

    McCord, Mark; Brodie, Alan; George, James; Guan, Yu; Nyffenegger, Ralph

    2018-01-23

    Light-emitting devices, such as LEDs, are tested using a photometric unit. The photometric unit, which may be an integrating sphere, can measure flux, color, or other properties of the devices. The photometric unit may have a single port or both an inlet and outlet. Light loss through the port, inlet, or outlet can be reduced or calibrated for. These testing systems can provide increased reliability, improved throughput, and/or improved measurement accuracy.

  12. New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization

    International Nuclear Information System (INIS)

    Samrout, M.; Yalaoui, F.; Cha-hat telet, E.; Chebbo, N.

    2005-01-01

    This article is based on a previous study made by Bris, Chatelet and Yalaoui [Bris R, Chatelet E, Yalaoui F. New method to minimise the preventive maintenance cost of series-parallel systems. Reliab Eng Syst Saf 2003;82:247-55]. They use genetic algorithm to minimize preventive maintenance cost problem for the series-parallel systems. We propose to improve their results developing a new method based on another technique, the Ant Colony Optimization (ACO). The resolution consists in determining the solution vector of system component inspection periods, T P . Those calculations were applied within the programming tool Matlab. Thus, highly interesting results and improvements of previous studies were obtained

  13. Preventive and Predictive Maintenance, Warehousing of Spares, Periodic Testing and In-Service Inspection Activities at the Nigerian Research Reactor-1 Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yusuf, I.; Mati, A. A.; Dewu, B. B.M., [Centre for Energy Research and Training, Ahmadu Bello University, Zaria (Nigeria)

    2014-08-15

    The Nigerian Research Reactor–1, or NIRR-1, is sited at Centre for Energy Research and Training, Ahmadu Bello University, Zaria, Nigeria. Activities on preventive or routine maintenance have been institutionalized since the commissioning of the reactor in February 2004. This has grossly reduced the rates of corrective maintenance activities and helped the reactor management a great deal in predicting failure rates of reactor components and other auxiliary units. Routine maintenance of systems and components are being carried out on a weekly, quarterly and annual basis based on manufacturer’s recommendations, which have been reviewed and improved over the years. The paper presents the implementation of maintenance activities in NIRR-1 from its initial criticality in 2004 till today and the new scheme for periodic testing and in-service-inspection developed after an IAEA Integrated Safety Assessment of Research Reactors mission. The measures put in place are envisaged to reduce the negative impact of ageing on NIRR-1 and its auxiliary systems. (author)

  14. Preoperational test report, recirculation condenser cooling systems

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-04

    This represents a preoperational test report for Recirculation Condenser Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The four system provide condenser cooling water for vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102. Each system consists of a valved piping loop, a pair of redundant recirculation pumps, a closed-loop evaporative cooling tower, and supporting instrumentation; equipment is located outside the farm on concrete slabs. Piping is routed to the each ventilation condenser inside the farm via below-grade concrete trenches. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  15. Preoperational test report, recirculation condenser cooling systems

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Recirculation Condenser Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The four system provide condenser cooling water for vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102. Each system consists of a valved piping loop, a pair of redundant recirculation pumps, a closed-loop evaporative cooling tower, and supporting instrumentation; equipment is located outside the farm on concrete slabs. Piping is routed to the each ventilation condenser inside the farm via below-grade concrete trenches. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  16. 40 CFR 792.90 - Animal and other test system care.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Animal and other test system care. 792... Animal and other test system care. (a) There shall be standard operating procedures for the housing, feeding, handling, and care of animals and other test systems. (b) All newly received test systems from...

  17. Tritium Systems Test Facility

    International Nuclear Information System (INIS)

    Cafasso, F.A.; Maroni, V.A.; Smith, W.H.; Wilkes, W.R.; Wittenberg, L.J.

    1978-01-01

    This TSTF proposal has two principal objectives. The first objective is to provide by mid-FY 1981 a demonstration of the fuel cycle and tritium containment systems which could be used in a Tokamak Experimental Power Reactor for operation in the mid-1980's. The second objective is to provide a capability for further optimization of tritium fuel cycle and environmental control systems beyond that which is required for the EPR. The scale and flow rates in TSTF are close to those which have been projected for a prototype experimental power reactor (PEPR/ITR) and will permit reliable extrapolation to the conditions found in an EPR. The fuel concentrations will be the same as in an EPR. Demonstrations of individual components of the deuterium-tritium fuel cycle and of monitoring, accountability and containment systems and of a maintenance methodology will be achieved at various times in the FY 1979-80 time span. Subsequent to the individual component demonstrations--which will proceed from tests with hydrogen (and/or deuterium) through tracer levels of tritium to full operational concentrations--a complete test and demonstration of the integrated fuel processing and tritium containment facility will be performed. This will occur near the middle of FY 1981. Two options were considered for the TSTF: (1) The modification of an existing building and (2) the construction of a new facility

  18. Research on Modularized Design and Allocation of Infectious Disease Prevention and Control Equipment in China.

    Science.gov (United States)

    Zhao, Xin; Wang, Yun-Dou; Zhang, Xiao-Feng; Gao, Shu-Tian; Guo, Li-Jun; Sun, Li-Na

    2017-06-01

    For the prevention and control of newly emergent or sudden infectious diseases, we built an on-site, modularized prevention and control system and tested the equipment by using the clustering analysis method. On the basis of this system, we propose a modular equipment allocation method and 4 applications of this method for different types of infectious disease prevention and control. This will help to improve the efficiency and productivity of anti-epidemic emergency forces and will provide strong technical support for implementing more universal and serialized equipment in China. (Disaster Med Public Health Preparedness. 2017;11:375-382).

  19. Preventive-care practices among adults with diabetes--Puerto Rico, 2000-2002.

    Science.gov (United States)

    2004-11-12

    Preventive-care practices among persons with diabetes can prevent or delay complications such as eye disease, kidney disease, or nerve damage that is a precursor to disabling foot disease. However, the level of diabetes-related preventive care is inadequate in the United States, and little has been reported about preventive care in Puerto Rico, where an estimated 10% of adults have diagnosed diabetes. CDC analyzed data from 2000, 2001, and 2002 Behavioral Risk Factor Surveillance System (BRFSS) surveys to assess the percentage of adults with diabetes in Puerto Rico who engaged in five selected preventive-care practices. This report summarizes the results of that analysis, which indicated that, with the exception of hemoglobin A1c testing, the percentages of adults engaging in preventive-care practices were lower than the target percentages set by U.S. national health objectives for 2010.

  20. Decision support systems in clinical practice: The case of venous thromboembolism prevention.

    Science.gov (United States)

    Nazarenko, G I; Kleymenova, E B; Payushik, S A; Otdelenov, V A; Sychev, D A; Yashina, L P

    2015-01-01

    ) automatically generates a quality register for VTE prevention.CDSS was implemented in June 2014. We analyzed VTE cases identified by triggers (deep vein thrombosis diagnosed by Doppler ultrasound and pulmonary embolism at the chest CT) that occurred in 2014 before and after CDSS implementation, as well as in the first half of 2015. Patients with VTE diagnosed during the first 48 hours of hospitalization or receiving anticoagulants in therapeutic doses were excluded from the analysis. Chi-square test for linear trend and non-parametric methods of descriptive statistics were used for data analysis. CDSS utilization was regulated by a special hospital-wide policy; lectures were organized to educate doctors how to use the system. Although international recommendations require VTE risk assessment for all hospitalized patients (except those receiving anticoagulant in therapeutic doses), the doctors filled forms for only 306 patients during the first 6 months of CDSS functioning (14.1% of discharges with length of stay >48 hours during this period). In the first half of 2015 the coverage of VTE risk assessment with CDSS was 19% (n = 506). Correctness of filling out the forms was 78.4%, in the rest of cases doctors made mistakes in choosing patient's profile or when filling in risk scales.Doctors adhere to given recommendations in 85.4% of cases. Most often (47.5%) pharmacotherapy with low molecular weight heparin (LMWH), preventive doses, was recommended by the system, and in this category the adherence to recommended practice was the lowest (74.6%). Among patients who underwent pharmacoprophylaxis, in 21.1% cases the use of anticoagulants was inconsistent with clinical guidelines or drug package insert (typically inappropriate choice of LMWH prophylactic doses, delaying or reducing the duration of prophylaxis).The rate of hospital-acquired VTE significantly decreased after CDSS implementation and was 11.71, 8.28 and 4.84 per 1,000 hospitalizations in the first and second half of 2014

  1. The impact of a prevention delivery system on perceived social capital: the PROSPER project.

    Science.gov (United States)

    Chilenski, Sarah M; Ang, Patricia M; Greenberg, Mark T; Feinberg, Mark E; Spoth, Richard

    2014-04-01

    The current study examined the impact of the PROSPER delivery system for evidence-based prevention programs on multiple indicators of social capital in a rural and semi-rural community sample. Utilizing a randomized blocked design, 317 individuals in 28 communities across two states were interviewed at three time points over the course of 2.5 years. Bridging, linking, and the public life skills forms of social capital were assessed via community members' and leaders' reports on the perceptions of school functioning and the Cooperative Extension System, collaboration among organizations, communication and collaboration around youth problems, and other measures. Longitudinal mixed model results indicate significant improvements in some aspects of bridging and linking social capital in PROSPER intervention communities. Given the strength of the longitudinal and randomized research design, results advance prevention science by suggesting that community collaborative prevention initiatives can significantly impact community social capital in a rural and semi-rural sample. Future research should further investigate changes in social capital in different contexts and how changes in social capital relate to other intervention effects.

  2. 40 CFR 160.90 - Animal and other test system care.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Animal and other test system care. 160... PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 160.90 Animal and other test... care of animals and other test systems. (b) All newly received test systems from outside sources shall...

  3. System design considerations for implementing performance and service tests on Class 1E batteries in accordance with IEEE 450-1980

    International Nuclear Information System (INIS)

    Pagan, E.J.; Weronick, R.

    1982-01-01

    Extensive electrical system design considerations are required to implement performance and service tests on Class 1E in accordance iwth IEEE 450-1980 ''Recommended Practice For Maintenance Testing and Replacement of Large Lead Storage Batteries For Generating Stations and Substations''. Class 1E is the safety classification of the electric equipment and systems that are essential to emergency reactor shutdown, cotainment isolation, reactor core cooling, and containment and reactor heat removal, or are otherwise essential to emergency reactor shutdown, containment isolation, reactor core cooling, and containment and reactor heat removal, or are otherwise essential in preventing significant release of radioactive material to the environment. The paper discusses alternatives which merit investigating to determine a feasible method for performing these tests at operating nuclear power plants, or plants nearing completion, which may lack provisions for incorporating such tests. The scope of each alternative presented includes a description and critique of the test circuit configuration and the auxiliary equipment required to isolate the battery and connect it to a Battery Capacity Tester (BCT). 6 refs

  4. Shake Table Testing of an Elevator System in a Full-Scale Five-Story Building.

    Science.gov (United States)

    Wang, Xiang; Hutchinson, Tara C; Astroza, Rodrigo; Conte, Joel P; Restrepo, José I; Hoehler, Matthew S; Ribeiro, Waldir

    2017-03-01

    This paper investigates the seismic performance of a functional traction elevator as part of a full-scale five-story building shake table test program. The test building was subjected to a suite of earthquake input motions of increasing intensity, first while the building was isolated at its base, and subsequently while it was fixed to the shake table platen. In addition, low-amplitude white noise base excitation tests were conducted while the elevator system was placed in three different configurations, namely, by varying the vertical location of its cabin and counterweight, to study the acceleration amplifications of the elevator components due to dynamic excitations. During the earthquake tests, detailed observation of the physical damage and operability of the elevator as well as its measured response are reported. Although the cabin and counterweight sustained large accelerations due to impact during these tests, the use of well-restrained guide shoes demonstrated its effectiveness in preventing the cabin and counterweight from derailment during high-intensity earthquake shaking. However, differential displacements induced by the building imposed undesirable distortion of the elevator components and their surrounding support structure, which caused damage and inoperability of the elevator doors. It is recommended that these aspects be explicitly considered in elevator seismic design.

  5. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  6. A novel test cage with an air ventilation system as an alternative to conventional cages for the efficacy testing of mosquito repellents.

    Science.gov (United States)

    Obermayr, U; Rose, A; Geier, M

    2010-11-01

    We have developed a novel test cage and improved method for the evaluation of mosquito repellents. The method is compatible with the United States Environmental Protection Agency, 2000 draft OPPTS 810.3700 Product Performance Test Guidelines for Testing of Insect Repellents. The Biogents cages (BG-cages) require fewer test mosquitoes than conventional cages and are more comfortable for the human volunteers. The novel cage allows a section of treated forearm from a volunteer to be exposed to mosquito probing through a window. This design minimizes residual contamination of cage surfaces with repellent. In addition, an air ventilation system supplies conditioned air to the cages after each single test, to flush out and prevent any accumulation of test substances. During biting activity tests, the untreated skin surface does not receive bites because of a screen placed 150 mm above the skin. Compared with the OPPTS 810.3700 method, the BG-cage is smaller (27 liters, compared with 56 liters) and contains 30 rather than hundreds of blood-hungry female mosquitoes. We compared the performance of a proprietary repellent formulation containing 20% KBR3023 with four volunteers on Aedes aegypti (L.) (Diptera: Culicidae) in BG- and conventional cages. Repellent protection time was shorter in tests conducted with conventional cages. The average 95% protection time was 4.5 +/- 0.4 h in conventional cages and 7.5 +/- 0.6 h in the novel BG-cages. The protection times measured in BG-cages were more similar to the protection times determined with these repellents in field tests.

  7. Developing and testing an intervention to prevent homelessness among individuals discharged from psychiatric wards to shelters and 'No Fixed Address'.

    Science.gov (United States)

    Forchuk, C; MacClure, S K; Van Beers, M; Smith, C; Csiernik, R; Hoch, J; Jensen, E

    2008-09-01

    Shelter data in a recent study revealed discharges from psychiatric facilities to shelters or the street occurred at least 194 times in 2002 in London, Ontario, Canada. This problem must be addressed to reduce the disastrous effects of such discharge, including re-hospitalization and prolonged homelessness. An intervention was developed and tested to prevent homelessness associated with discharge directly to no fixed address. A total of 14 participants at-risk of being discharged without housing were enrolled, with half randomized into the intervention group. The intervention group was provided with immediate assistance in accessing housing and assistance in paying their first and last month's rent. The control group received usual care. Data was collected from participants prior to discharge, at 31 and 6-months post-discharge. All the individuals in the intervention group maintained housing after 3 and 6 months. All but one individual in the control group remained homeless after 3 and 6 months. The exception joined the sex trade to avoid homelessness. The results of this pilot were so dramatic that randomizing to the control group was discontinued. Discussions are underway to routinely implement the intervention. Systemic improvements can prevent homelessness for individuals being discharged from psychiatric wards.

  8. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    Science.gov (United States)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  9. The health beliefs of mothers about preventing cervical cancer and their intention to recommend the Pap test to their daughters: a cross-sectional survey

    Directory of Open Access Journals (Sweden)

    Hae Won Kim

    2016-05-01

    Full Text Available Abstract Background Mothers have a primary role in the prevention of cervical cancer in Korea. This study aimed to determine the awareness and health beliefs of mothers about preventing cervical cancer in their daughters, their intention to recommend the Pap test to their daughters, and the factors influencing this intention. Methods A cross-sectional survey design was employed, and the study enrolled mothers (n = 1,581 of pubescent girls aged 13 to 18 years who were living nationwide in Korea. The six health-beliefs variables related to preventing cervical cancer in their daughters, awareness of the importance of cervical cancer prevention methods, and the intention to recommend the Pap test to daughters were investigated. The impacts of these health beliefs of the mothers and the sociodemographic factors influencing their intention to recommend the Pap test to their daughters were assessed using multiple logistic regression analysis. Results Almost one-quarter (23.7 % of the mothers had talked about the Pap test, 69.2 % were intending to recommend the Pap test to their daughters, and 38.5 % considered that the Pap test could be necessary if their daughters became sexually active. The significant health beliefs influencing the intention to recommend the Pap test were the perceived barriers [odds ratio (OR = 1.47, 95 % confidence interval (95 % CI = 1.03–2.11] and benefits (OR = 2.25, 95 % CI = 1.55–3.25. The significant sociodemographic factors of mothers were their education (OR = 1.52, 95 % CI = 1.08–2.13, their experience of talking about the Pap test with their daughters (OR = 2.11, 95 % CI = 1.23–3.64, their regularity of undergoing the Pap test themselves (OR = 1.98, 95 % CI = 1.30–3.03, and their age when they first underwent the Pap test (OR = 1.60, 95 % CI = 1.43–0.82. Conclusions The mothers perceived HPV vaccination as the most important of the five methods

  10. Modification and upgradation of corrosion fatigue testing system

    International Nuclear Information System (INIS)

    Farooq, A.; Qamar, R.

    2006-08-01

    Stress Corrosion Cracking (SCC) and Corrosion Fatigue (CF) are important tests which are performed to check the integrity of structural materials operating in different environments, such as nuclear power system, steam and gas turbines, aircraft marine structure, pipelines and bridges. To establish the environmental testing facility on laboratory scale, NMD acquired a computerized (286 Based PC) electromechanical testing machine from M/S CorTest, USA. This machine was commissioned at NMD in 1989. Since then it has been utilized to test and qualify the materials provided by different establishments of PAEC for SCC and CF behavior. However, in October 2004, computer attached to the machine was corrupted and became out of order. Users were handicapped because there was no any alternate system i.e. Manual control tower to operate the machine. Then users approached to Computer Division to investigate the malfunctioning at the computer. Therefore, upon complete checkup of system, it was diagnosed that there was a serious problem in the hard disk and mother board of the computer. Much difficulty was faced in retrieving the application software from the obsolete 286 computer system. Then the basic aim was to replace the old computer with Pentium System. But with Pentium system application software was not working. Since we have already recovered full application software package including source programs, so all the seventeen programs has been thoroughly studied. Four programs had to be modified according to the new hardware. Now the new Pentium system with modified software has been interfaced with the machine. Machine was tested for the both types of above mentioned tests and compared with previous results. The performance of machine was confirmed satisfactory on the new setup. (author)

  11. Acceptance test report for 241-AW process air system

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    The acceptance test procedure (ATP) for the compressed air system at building 241-AW-273 was completed on March 11, 1993. The system was upgraded to provide a reliable source of compressed air to the tank farm. The upgrade included the demolition of the existing air compressor and associated piping, as well as the installation of a new air compressor with a closed loop cooling system. A compressed air cross-tie was added to allow the process air compressor to function as a back-up to the existing instrument air compressor. The purpose of the ATP was to achieve three primary objectives: verify system upgrade in accordance with the design media; provide functional test of system components and controls; and prepare the system for the Operational Test. The ATP was successfully completed with thirteen exceptions, which were resolved prior to completing the acceptance test. The repaired exceptions had no impact to safety or the environment and are briefly summarized. Testing ensured that the system was installed per design, that its components function as required and that it is ready for operational testing and subsequent turnover to operations

  12. UTILITY ADVANCED TURBINE SYSTEMS(ATS) TECHNOLOGY READINESS TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth A. Yackly

    2001-06-01

    The following paper provides an overview of GE's H System{trademark} technology, and specifically, the design, development, and test activities associated with the DOE Advanced Turbine Systems (ATS) program. There was intensive effort expended in bringing this revolutionary advanced technology program to commercial reality. In addition to describing the magnitude of performance improvement possible through use of H System{trademark} technology, this paper discusses the technological milestones during the development of the first 9H (50Hz) and 7H (60 Hz) gas turbines. To illustrate the methodical product development strategy used by GE, this paper discusses several technologies that were essential to the introduction of the H System{trademark}. Also included are analyses of the series of comprehensive tests of materials, components and subsystems that necessarily preceded full scale field testing of the H System{trademark}. This paper validates one of the basic premises with which GE started the H System{trademark} development program: exhaustive and elaborate testing programs minimized risk at every step of this process, and increase the probability of success when the H System{trademark} is introduced into commercial service. In 1995, GE, the world leader in gas turbine technology for over half a century, in conjunction with the DOE National Energy Technology Laboratory's ATS program, introduced its new generation of gas turbines. This H System{trademark} technology is the first gas turbine ever to achieve the milestone of 60% fuel efficiency. Because fuel represents the largest individual expense of running a power plant, an efficiency increase of even a single percentage point can substantially reduce operating costs over the life of a typical gas-fired, combined-cycle plant in the 400 to 500 megawatt range. The H System{trademark} is not simply a state-of-the-art gas turbine. It is an advanced, integrated, combined-cycle system in which every

  13. System Design and Performance Test of Hydraulic Intensifier

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyoung Eui; Lee, Gi Chun [Korea Institute of Machinery and Materials, Daejeon (Korea, Republic of); Kim, Jae Hoon [Chungnam National University, Daejeon (Korea, Republic of)

    2010-07-15

    Components such as pressure vessel, hydraulic hose assembly, accumulator, hydraulic cylinder, hydraulic valve, pipe, etc., are tested under the impulse-pressure conditions prescribed in ISO and SAE standards. The impulse pressure test machine needs to have a high pressure, a precise control system and a long life. It should satisfy the requirements for fabrication of the impulse tester to generate ultra high pressure in the hydraulic system. In the impulse tester, a servo-valve control system is adopted; although the control application is convenient, it is expensive owing to the cost of developing the system. The type of the control system determines the pressure wave, which affects the components that are tested. In this study, the manufacturing process and the intensifier system design related to the flow, pressure, and the increasing rate of pressure are investigated. The results indicate the ultra high pressure waves in the system.

  14. The LISA Pathfinder interferometry-hardware and system testing

    Energy Technology Data Exchange (ETDEWEB)

    Audley, H; Danzmann, K; MarIn, A Garcia; Heinzel, G; Monsky, A; Nofrarias, M; Steier, F; Bogenstahl, J [Albert-Einstein-Institut, Max-Planck-Institut fuer Gravitationsphysik und Universitaet Hannover, 30167 Hannover (Germany); Gerardi, D; Gerndt, R; Hechenblaikner, G; Johann, U; Luetzow-Wentzky, P; Wand, V [EADS Astrium GmbH, Friedrichshafen (Germany); Antonucci, F [Dipartimento di Fisica, Universita di Trento and INFN, Gruppo Collegato di Trento, 38050 Povo, Trento (Italy); Armano, M [European Space Astronomy Centre, European Space Agency, Villanueva de la Canada, 28692 Madrid (Spain); Auger, G; Binetruy, P [APC UMR7164, Universite Paris Diderot, Paris (France); Benedetti, M [Dipartimento di Ingegneria dei Materiali e Tecnologie Industriali, Universita di Trento and INFN, Gruppo Collegato di Trento, Mesiano, Trento (Italy); Boatella, C, E-mail: antonio.garcia@aei.mpg.de [CNES, DCT/AQ/EC, 18 Avenue Edouard Belin, 31401 Toulouse, Cedex 9 (France)

    2011-05-07

    Preparations for the LISA Pathfinder mission have reached an exciting stage. Tests of the engineering model (EM) of the optical metrology system have recently been completed at the Albert Einstein Institute, Hannover, and flight model tests are now underway. Significantly, they represent the first complete integration and testing of the space-qualified hardware and are the first tests on an optical system level. The results and test procedures of these campaigns will be utilized directly in the ground-based flight hardware tests, and subsequently during in-flight operations. In addition, they allow valuable testing of the data analysis methods using the MATLAB-based LTP data analysis toolbox. This paper presents an overview of the results from the EM test campaign that was successfully completed in December 2009.

  15. Targeted Therapy for Breast Cancer Prevention

    Science.gov (United States)

    den Hollander, Petra; Savage, Michelle I.; Brown, Powel H.

    2013-01-01

    With a better understanding of the etiology of breast cancer, molecularly targeted drugs have been developed and are being testing for the treatment and prevention of breast cancer. Targeted drugs that inhibit the estrogen receptor (ER) or estrogen-activated pathways include the selective ER modulators (tamoxifen, raloxifene, and lasofoxifene) and aromatase inhibitors (AIs) (anastrozole, letrozole, and exemestane) have been tested in preclinical and clinical studies. Tamoxifen and raloxifene have been shown to reduce the risk of breast cancer and promising results of AIs in breast cancer trials, suggest that AIs might be even more effective in the prevention of ER-positive breast cancer. However, these agents only prevent ER-positive breast cancer. Therefore, current research is focused on identifying preventive therapies for other forms of breast cancer such as human epidermal growth factor receptor 2 (HER2)-positive and triple-negative breast cancer (TNBC, breast cancer that does express ER, progesterone receptor, or HER2). HER2-positive breast cancers are currently treated with anti-HER2 therapies including trastuzumab and lapatinib, and preclinical and clinical studies are now being conducted to test these drugs for the prevention of HER2-positive breast cancers. Several promising agents currently being tested in cancer prevention trials for the prevention of TNBC include poly(ADP-ribose) polymerase inhibitors, vitamin D, and rexinoids, both of which activate nuclear hormone receptors (the vitamin D and retinoid X receptors). This review discusses currently used breast cancer preventive drugs, and describes the progress of research striving to identify and develop more effective preventive agents for all forms of breast cancer. PMID:24069582

  16. Air pollution control system testing at the DOE offgas components test facility

    International Nuclear Information System (INIS)

    Burns, D.B.; Speed, D.; VanPelt, W.; Burns, H.H.

    1997-01-01

    In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Consolidated Incineration Facility (CIF) to treat solid and liquid RCRA hazardous and mixed wastes. The Savannah River Technology Center (SRTC) leads an extensive technical support program designed to obtain incinerator and air pollution control equipment performance data to support facility start-up and operation. A key component of this technical support program includes the Offgas Components Test Facility (OCTF), a pilot-scale offgas system test bed. The primary goal for this test facility is to demonstrate and evaluate the performance of the planned CIF Air Pollution Control System (APCS). To accomplish this task, the OCTF has been equipped with a 1/10 scale CIF offgas system equipment components and instrumentation. In addition, the OCTF design maximizes the flexibility of APCS operation and facility instrumentation and sampling capabilities permit accurate characterization of all process streams throughout the facility. This allows APCS equipment performance to be evaluated in an integrated system under a wide range of possible operating conditions. This paper summarizes the use of this DOE test facility to successfully demonstrate APCS operability and maintainability, evaluate and optimize equipment and instrument performance, and provide direct CIF start-up support. These types of facilities are needed to permit resolution of technical issues associated with design and operation of systems that treat and dispose combustible hazardous, mixed, and low-level radioactive waste throughout and DOE complex

  17. SIMS prototype system 1 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.

  18. Test of user- and system programs coded in real time languages - requirements on program language and testing tool

    International Nuclear Information System (INIS)

    Hertlin, J.; Mackert, M.

    1979-01-01

    In the present paper the functions are presented, which should be part of a test system for user programs in a higher treat time programming language, taking into account time sequences and competitive processes. As can be shown by the problem of testing, use of higher level real time programming languages renders the task of program development essentially easier, however performance of test procedures without appropriate test systems is very difficult. After the presentation of notions and methods for the testing of programs, general requirements on testing tools are described and the test system functions for a program test, beeing uncritical with respect to time, are placed together. Thereby, for every individual function, the interface between the test system, the program under test, and the residual program-generation system (compiler, binder, operating system, delay-time system, and loader) is given too. For the time-critical test, a series of desirable functions are described, which can be implemented with acceptable expense. (orig.) [de

  19. Fire hazard analysis at the first unit of the Ignalina nuclear power plant: 1. Analysis of fire prevention and ventilation systems and secondary effects

    International Nuclear Information System (INIS)

    Poskas, P.; Simonis, V.; Zujus, R. and others

    2004-01-01

    Evaluation of the fire prevention and ventilation systems and the secondary effects on safety at the Ignalina NPP from the point of view of fire hazard using computerized system is presented. Simplified screening algorithms for fire prevention, ventilation and the evaluation of secondary effects are developed, which allow accelerating fire hazard analysis at the Ignalina NPP. The analysis indicated that the fire prevention systems practically meet the national requirements and international recommendations for fire prevention. But it is necessary to introduce in separate rooms the measures improving fire prevention to guarantee the effective functioning of the ventilation systems and the reduction of the influence of secondary effects on safety. Computerized system of fire prevention and ventilation systems and evaluation of secondary effects on safety can be easily applied for fire hazard analysis at different big plants. (author)

  20. A LabVIEWTM-based detector testing system

    International Nuclear Information System (INIS)

    Yang Haori; Li Yuanjing; Wang Yi; Li Yulan; Li Jin

    2003-01-01

    The construction of a LabVIEW-based detector testing system is described in this paper. In this system, the signal of detector is magnified and digitized, so amplitude or time spectrum can be obtained. The Analog-to-Digital Converter is a peak-sensitive ADC based on VME bus. The virtual instrument constructed by LabVIEW can be used to acquire data, draw spectrum and save testing results

  1. 21 CFR 862.1810 - Vitamin B12 test system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vitamin B12 test system. 862.1810 Section 862.1810....1810 Vitamin B12 test system. (a) Identification. A vitamin B12 test system is a device intended to measure vitamin B12 in serum, plasma, and urine. Measurements obtained by this device are used in the...

  2. Integrated Automatic Test System for Airborne Optoelectronic Pods

    International Nuclear Information System (INIS)

    Zhang, Z M; Ding, M J; Wang, L

    2006-01-01

    Based on the introduction of the construction and basic principle of the airborne optoelectronic pod, in accordance with the performance standards of the pod, the total solution scheme of the automatic test system used for testing the combination property is proposed in this paper. The main structure, hardware and software design of the system based on the virtual instruments technology are also discussed in detail. The result of the true run proves the practicality, efficiency, high accuracy and other characteristics of the computer aided testing system based on virtual instruments

  3. New control system for BR2. Preventive approach to process control

    International Nuclear Information System (INIS)

    Van den Branden, G.; Koonen, E.

    2011-01-01

    In 1961, the BR2 reactor became critical for the first time. Yet the multi-functional research reactor at SCK-CEN is not out of date, quite the contrary. Regular upgrades and innovations keep the reactor in step with the latest advancements in technology. In 2010, the control system of BR2, a vital part of the reactor, was replaced as a preventive measure.

  4. DOE LeRC photovoltaic systems test facility

    Science.gov (United States)

    Cull, R. C.; Forestieri, A. F.

    1978-01-01

    The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.

  5. A novel energy regeneration system for emulsion pump tests

    Energy Technology Data Exchange (ETDEWEB)

    Yilei, Li; Zhencai, Zhu; Guohua, Cao [China University of Mining and Technology, Xuzhou (China); Guoan, Chen [Command Academy of the Corps of Engineers, Xuzhou (China)

    2013-04-15

    A novel energy regeneration system based on cylinders and a rectifier valve for emulsion pump tests is presented and studied. The overall structure and working principles of this system are introduced. Both simulation and experiments are carried out to investigate the energy regeneration feasibility and capability of this novel system. The simulation and experimental results validate that this system is able to save energy and satisfy the test requirement. The energy recovery coefficient and overall energy regeneration coefficient of the test bench are 0.785 and 0.214, respectively. Measures to improve these two coefficients are also given accordingly after analysis of power loss. This novel system brings a new method of energy regeneration for emulsion pump tests.

  6. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  7. Strategies and Systems-Level Interventions to Combat or Prevent Drug Counterfeiting: A Systematic Review of Evidence Beyond Effectiveness.

    Science.gov (United States)

    Fadlallah, Racha; El-Jardali, Fadi; Annan, Farah; Azzam, Hayat; Akl, Elie A

    2016-01-01

    A recent systematic review suggested that drug registrations and onsite quality inspections may be effective in reducing the prevalence of counterfeit and substandard drugs. However, simply replicating the most effective interventions is problematic, as it denotes implementing the intervention without further adaptation. The aim was to systematically review the evidence beyond effectiveness for systems-level interventions to combat or prevent drug counterfeiting. We conducted an extensive search, including an electronic search of 14 databases. We included studies examining the efficiency, feasibility, reliability, and economic outcomes of the interventions, as well as barriers and facilitators to their implementation. Two reviewers selected eligible studies and abstracted data in duplicate and independently. We synthesized the results narratively, stratified by type of intervention. Of 10,220 captured citations, 19 met our inclusion criteria. The findings suggest that the following may strengthen regulatory measures (e.g., registration): minimizing drug diversion, enhancing lines of communications, ensuring feedback on drug quality, and promoting strict licensing criteria. There is evidence that onsite quality surveillance and inspection systems may be efficient and cost-effective for preliminary testing of large samples of drugs. Laws and legislation need to be specific to counterfeit drugs, include firm penalties, address online purchasing of drugs, and be complemented by education of judges and lawyers. Public awareness and education should rely on multiple platforms and comprehensive and dedicated content. While product authentication technologies may be efficient and reliable in detecting counterfeit drugs in the supply chain, they require a strong information system infrastructure. As for pharmacovigilance systems, it is critical to tackle the issue of underreporting, to enhance their chances of success. Several factors are critical to the successful design

  8. Test-based approach to cable tray support system analysis and design: Behavior and test methods

    Energy Technology Data Exchange (ETDEWEB)

    Reigles, Damon G., E-mail: dreigles@engnovex.com [engNoveX, Inc., 19C Trolley Square, Wilmington, DE 19806 (United States); Brachmann, Ingo; Johnson, William H. [Bechtel Nuclear, Security & Environmental, 12011 Sunset Hills Rd, Suite 110, Reston, VA 20190 (United States); Gürbüz, Orhan [Tobolski Watkins Engineering, Inc., 4125 Sorrento Valley Blvd, Suite B, San Diego, CA 92121 (United States)

    2016-06-15

    Highlights: • Describes dynamic response behavior of unistrut type cable tray supports. • Summarizes observations from past full-scale shake table test programs. • Outlines testing methodologies necessary to identify key system parameters. - Abstract: Nuclear power plant safety-related cable tray support systems subjected to seismic loadings were originally understood and designed to behave as linear elastic systems. This behavioral paradigm persisted until the early 1980s when, due to evolution of regulatory criteria, some as-installed systems needed to be qualified to higher seismic motions than originally designed for. This requirement prompted a more in-depth consideration of the true seismic response behavior of support systems. Several utilities initiated extensive test programs, which demonstrated that trapeze strut-type cable tray support systems exhibited inelastic and nonlinear response behaviors with plastic hinging at the connections together with high damping due to bouncing of cables in the trays. These observations were used to demonstrate and justify the seismic adequacy of the aforementioned as-installed systems. However, no formalized design methodology or criteria were ever established to facilitate use of these test data for future evaluations. This paper assimilates and reviews the various test data and conclusions for the purpose of developing a design methodology for the seismic qualification of safety-related cable tray support systems.

  9. Setting strategy for system change: using concept mapping to prioritise national action for chronic disease prevention.

    Science.gov (United States)

    Wutzke, Sonia; Roberts, Nick; Willis, Cameron; Best, Allan; Wilson, Andrew; Trochim, William

    2017-08-08

    Chronic diseases are a serious and urgent problem, requiring at-scale, multi-component, multi-stakeholder action and cooperation. Despite numerous national frameworks and agenda-setting documents to coordinate prevention efforts, Australia, like many countries internationally, is yet to substantively impact the burden from chronic disease. Improved evidence on effective strategies for the prevention of chronic disease is required. This research sought to articulate a priority set of important and feasible action domains to inform future discussion and debate regarding priority areas for chronic disease prevention policy and strategy. Using concept mapping, a mixed-methods approach to making use of the best available tacit knowledge of recognised, diverse and well-experienced actors, and national actions to improve the prevention of chronic disease in Australia were identified and then mapped. Participants (ranging from 58 to 78 in the various stages of the research) included a national sample of academics, policymakers and practitioners. Data collection involved the generation and sorting of statements by participants. A series of visual representations of the data were then developed. A total of 95 statements were distilled into 12 clusters for action, namely Inter-Sectoral Partnerships; Systems Perspective/Action; Governance; Roles and Responsibilities; Evidence, Feedback and Learning; Funding and Incentive; Creating Demand; Primary Prevention; Social Determinants and Equity; Healthy Environments; Food and Nutrition; and Regulation and Policy. Specific areas for more immediate national action included refocusing the health system to prevention over cure, raising the profile of public health with health decision-makers, funding policy- and practice-relevant research, improving communication about prevention, learning from both global best-practice and domestic successes and failures, increasing the focus on primary prevention, and developing a long-term prevention

  10. A Portable Environment Test System: A Field Assessment of Organotin Leachates--Test and Evaluation.

    Science.gov (United States)

    1987-11-01

    of organotin-based antifouling (AF) coatings, NOSC researchers used this facility to study the effects of tributyltin ( TBT ), the primary toxic ...Environmental Test System (PETS) was evaluated with tributyltin ( TBT ) anti oling leachates in Sin Diego Bay over a 7-month period. Overall mean test...EXECUTIVE SUMMARY A Portable Environmental Test System (PETS) was evaluated with tributyltin ( TBT ) antifouling leachates in San Diego Bay for 7

  11. Test quality

    International Nuclear Information System (INIS)

    Hartley, R.S.; Keller, A.E.

    1992-01-01

    Inservice testing of safety-related components at nuclear power plants is performed under the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (the Code). Subsections IWP and IWV of Section 11 of the Code state test method and frequency requirements for pumps and valves, respectively. Tests vary greatly in quality and frequency. This paper explores the concept of test quality and its relationship with operational readiness and preventive maintenance. This paper also considers the frequencies of component testing. Test quality is related to a test's ability to detect degradation that can cause component failure. The quality of the test depends on several factors, including specific parameters measured, system or component conditions, and instrument accuracy. The quality of some currently required tests for check valves, motor-operated valves, and pumps is also discussed. Suggestions are made to improve test quality by measuring different parameters, testing valves under load, and testing positive displacement pumps at high pressure and centrifugal pumps at high flow rate conditions. These suggestions can help to improve the level of assurance of component operational readiness gained from testing

  12. Acceptance Test Report for 241-U compressed air system

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027

  13. Lessons from obesity prevention for the prevention of mental disorders: the primordial prevention approach.

    Science.gov (United States)

    Hayward, Joshua; Jacka, Felice N; Waters, Elizabeth; Allender, Steven

    2014-09-10

    Emerging evidence supports a relationship between risk factors for obesity and the genesis of the common mental disorders, depression and anxiety. This suggests common mental disorders should be considered as a form of non-communicable disease, preventable through the modification of lifestyle behaviours, particularly diet and physical activity. Obesity prevention research since the 1970's represents a considerable body of knowledge regarding strategies to modify diet and physical activity and so there may be clear lessons from obesity prevention that apply to the prevention of mental disorders. For obesity, as for common mental disorders, adolescence represents a key period of vulnerability. In this paper we briefly discuss relationships between modifiable lifestyle risk factors and mental health, lifestyle risk factor interventions in obesity prevention research, the current state of mental health prevention, and the implications of current applications of systems thinking in obesity prevention research for lifestyle interventions. We propose a potential focus for future mental health promotion interventions and emphasise the importance of lessons available from other lifestyle modification intervention programmes.

  14. Safety Test Report for the SNF Dry Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Bang, K. S.; Seo, K. S.; Lee, J. H.; Lee, J. C.; Choi, W. S

    2008-11-15

    This is technical report conducted by KAERI under the contract with NETEC for safety test for the PWR S/F dry storage system. Leak Test was performed after drop test and turn-over test, the measured leakage rate was lower than allowable leakage rate. It is revealed that the containment integrity of the dry storage system is maintained. In the seismic test, the moving of the model was measured at SRTH seismic response of 0.4 g and 0.8 g. Therefore the seismic test results can be used fully to the test data for verification of the seismic analysis. In the thermal test, the direction of the inlet and outlet of the air has no effect on the heat transfer performance. The passive heat removal system of the horizontal storage module was designed well.

  15. Diagnosis - Using automatic test equipment and artificial intelligence expert systems

    Science.gov (United States)

    Ramsey, J. E., Jr.

    Three expert systems (ATEOPS, ATEFEXPERS, and ATEFATLAS), which were created to direct automatic test equipment (ATE), are reviewed. The purpose of the project was to develop an expert system to troubleshoot the converter-programmer power supply card for the F-15 aircraft and have that expert system direct the automatic test equipment. Each expert system uses a different knowledge base or inference engine, basing the testing on the circuit schematic, test requirements document, or ATLAS code. Implementing generalized modules allows the expert systems to be used for any different unit under test. Using converted ATLAS to LISP code allows the expert system to direct any ATE using ATLAS. The constraint propagated frame system allows for the expansion of control by creating the ATLAS code, checking the code for good software engineering techniques, directing the ATE, and changing the test sequence as needed (planning).

  16. Test-Driven, Model-Based Systems Engineering

    DEFF Research Database (Denmark)

    Munck, Allan

    Hearing systems have evolved over many years from simple mechanical devices (horns) to electronic units consisting of microphones, amplifiers, analog filters, loudspeakers, batteries, etc. Digital signal processors replaced analog filters to provide better performance end new features. Central....... This thesis concerns methods for identifying, selecting and implementing tools for various aspects of model-based systems engineering. A comprehensive method was proposed that include several novel steps such as techniques for analyzing the gap between requirements and tool capabilities. The method...... was verified with good results in two case studies for selection of a traceability tool (single-tool scenario) and a set of modeling tools (multi-tool scenarios). Models must be subjected to testing to allow engineers to predict functionality and performance of systems. Test-first strategies are known...

  17. Review. Systems for prevention and control of epidemic emergencies

    Directory of Open Access Journals (Sweden)

    Paolo Calistri

    2013-09-01

    Full Text Available The development of early warning systems is fundamental for preventing the spread of infectious diseases. Data collection, however, is a costly activity and it is not possible to implement early warning systems everywhere and for all possible events. Hence, tools helping to improve the focus of surveillance efforts are of paramount importance. Risk assessment methods and other provisional modelling techniques may permit to estimate the probability of introduction and spread of infectious diseases in different geographical areas. Similarly, efficient information systems must be in place to assist the veterinary services in case of epidemic emergencies in order to support the prompt application of control measures for the containment of the infection and the reduction of the magnitude of negative consequences. This review describes two recent approaches to the estimation of the probability of introduction and spread of infectious diseases based on the use of risk maps/spatial modelling and Social Network Analysis (SNA techniques. The review also describes a web application developed in Italy to help official veterinary services to trace animals in case of outbreaks of infectious diseases.

  18. A test of safety, violence prevention, and civility climate domain-specific relationships with relevant workplace hazards.

    Science.gov (United States)

    Gazica, Michele W; Spector, Paul E

    2016-01-01

    Safety climate, violence prevention climate, and civility climate were independently developed and linked to domain-specific workplace hazards, although all three were designed to promote the physical and psychological safety of workers. To test domain specificity between conceptually related workplace climates and relevant workplace hazards. Data were collected from 368 persons employed in various industries and descriptive statistics were calculated for all study variables. Correlational and relative weights analyses were used to test for domain specificity. The three climate domains were similarly predictive of most workplace hazards, regardless of domain specificity. This study suggests that the three climate domains share a common higher order construct that may predict relevant workplace hazards better than any of the scales alone.

  19. INFORMATION-MEASURING TEST SYSTEM OF DIESEL LOCOMOTIVE HYDRAULIC TRANSMISSIONS

    Directory of Open Access Journals (Sweden)

    I. V. Zhukovytskyy

    2015-08-01

    Full Text Available Purpose. The article describes the process of developing the information-measuring test system of diesel locomotives hydraulic transmission, which gives the possibility to obtain baseline data to conduct further studies for the determination of the technical condition of diesel locomotives hydraulic transmission. The improvement of factory technology of post-repair tests of hydraulic transmissions by automating the existing hydraulic transmission test stands according to the specifications of the diesel locomotive repair enterprises was analyzed. It is achieved based on a detailed review of existing foreign information-measuring test systems for hydraulic transmission of diesel locomotives, BelAZ earthmover, aircraft tug, slag car, truck, BelAZ wheel dozer, some brands of tractors, etc. The problem for creation the information-measuring test systems for diesel locomotive hydraulic transmission is being solved, starting in the first place from the possibility of automation of the existing test stand of diesel locomotives hydraulic transmission at Dnipropetrovsk Diesel Locomotive Repair Plant "Promteplovoz". Methodology. In the work the researchers proposed the method to create a microprocessor automated system of diesel locomotives hydraulic transmission stand testing in the locomotive plant conditions. It acts by justifying the selection of the necessary sensors, as well as the application of the necessary hardware and software for information-measuring systems. Findings. Based on the conducted analysis there was grounded the necessity of improvement the plant hydraulic transmission stand testing by creating a microprocessor testing system, supported by the experience of developing such systems abroad. Further research should be aimed to improve the accuracy and frequency of data collection by adopting the more modern and reliable sensors in tandem with the use of filtering software for electromagnetic and other interference. Originality. The

  20. 16 CFR 1203.16 - Dynamic strength of retention system test.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Dynamic strength of retention system test.... (2) The retention system strength test equipment shall consist of a dynamic impact apparatus that... stirrup. (2) Mark the pre-test position of the retention system, with the entire dynamic test apparatus...