WorldWideScience

Sample records for preliminary safety review

  1. Preliminary safety analysis methodology for the SMART

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Kyoo Hwan; Chung, Y. J.; Kim, H. C.; Sim, S. K.; Lee, W. J.; Chung, B. D.; Song, J. H. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-03-01

    This technical report was prepared for a preliminary safety analysis methodology of the 330MWt SMART (System-integrated Modular Advanced ReacTor) which has been developed by Korea Atomic Energy Research Institute (KAERI) and funded by the Ministry of Science and Technology (MOST) since July 1996. This preliminary safety analysis methodology has been used to identify an envelope for the safety of the SMART conceptual design. As the SMART design evolves, further validated final safety analysis methodology will be developed. Current licensing safety analysis methodology of the Westinghouse and KSNPP PWRs operating and under development in Korea as well as the Russian licensing safety analysis methodology for the integral reactors have been reviewed and compared to develop the preliminary SMART safety analysis methodology. SMART design characteristics and safety systems have been reviewed against licensing practices of the PWRs operating or KNGR (Korean Next Generation Reactor) under construction in Korea. Detailed safety analysis methodology has been developed for the potential SMART limiting events of main steam line break, main feedwater pipe break, loss of reactor coolant flow, CEA withdrawal, primary to secondary pipe break and the small break loss of coolant accident. SMART preliminary safety analysis methodology will be further developed and validated in parallel with the safety analysis codes as the SMART design further evolves. Validated safety analysis methodology will be submitted to MOST as a Topical Report for a review of the SMART licensing safety analysis methodology. Thus, it is recommended for the nuclear regulatory authority to establish regulatory guides and criteria for the integral reactor. 22 refs., 18 figs., 16 tabs. (Author)

  2. Review of SFR Design Safety using Preliminary Regulatory PSA Model

    International Nuclear Information System (INIS)

    Na, Hyun Ju; Lee, Yong Suk; Shin, Andong; Suh, Nam Duk

    2013-01-01

    The major objective of this research is to develop a risk model for regulatory verification of the SFR design, and thereby, make sure that the SFR design is adequate from a risk perspective. In this paper, the development result of preliminary regulatory PSA model of SFR is discussed. In this paper, development and quantification result of preliminary regulatory PSA model of SFR is discussed. It was confirmed that the importance PDRC and ADRC dampers is significant as stated in the result of KAERI PSA model. However, the importance can be changed significantly depending on assumption of CCCG and CCF factor of PDRC and ADRC dampers. SFR (sodium-cooled fast reactor) which is Gen-IV nuclear energy system, is designed to accord with the concept of stability, sustainability and proliferation resistance. KALIMER-600, which is under development in Korea, includes passive safety systems (e. g. passive reactor shutdown, passive residual heat removal, and etc.) as well as active safety systems. Risk analysis from a regulatory perspective is needed to support the regulatory body in its safety and licensing review for SFR (KALIMER-600). Safety issues should be identified in the early design phase in order to prevent the unexpected cost increase and delay of the SFR licensing schedule that may be caused otherwise

  3. Response to Absorber-Focus Coil Preliminary Safety Review Panel

    International Nuclear Information System (INIS)

    Barr, Giles; Baynham, Elwyn; Black, Edgar; Bradshaw, Tom; Cummings, Mary Anne; Green, Michael A.; Ishimoto, Shigeru; Ivanyushenkov, Yury; Lau, Wing; Zisman, Michael S.

    2004-01-01

    In this document we provide responses to the various issues raised in the report of the Preliminary Safety Review Panel (see http://mice.iit.edu/mnp/MICE0069.pdf). In some cases we have made design changes in response to the Panels suggestions. In other cases, we have chosen not to do so. In a few cases, we indicate our plans, although the tasks have not yet been completed. For simplicity, the responses are organized along the same lines as those of the Panel Report

  4. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    International Nuclear Information System (INIS)

    Herborn, D.I.

    1991-10-01

    The requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs

  5. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    International Nuclear Information System (INIS)

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals

  6. Preliminary safety analysis of the HTTR-IS nuclear hydrogen production system

    International Nuclear Information System (INIS)

    Sato, Hiroyuki; Ohashi, Hirofumi; Tazawa, Yujiro; Tachibana, Yukio; Sakaba, Nariaki

    2010-06-01

    Japan Atomic Energy Agency is planning to demonstrate hydrogen production by thermochemical water-splitting IS process utilizing heat from the high-temperature gas-cooled reactor HTTR (HTTR-IS system). The previous study identified that the HTTR modification due to the coupling of hydrogen production plant requires an additional safety review since the scenario and quantitative values of the evaluation items would be altered from the original HTTR safety review. Hence, preliminary safety analyses are conducted by using the system analysis code. Calculation results showed that evaluation items such as a coolant pressure, temperatures of heat transfer tubes at the pressure boundary, etc., did not exceed allowable values. Also, the peak fuel temperature did not exceed allowable value and therefore the reactor core was not damaged and cooled sufficiently. This report compiles calculation conditions, event scenarios and the calculation results of the preliminary safety analysis. (author)

  7. A Preliminary Review of Fatigue Among Rail Staff

    OpenAIRE

    Jialin Fan; Andrew P. Smith

    2018-01-01

    Background: Fatigue is a severe problem in the rail industry, which may jeopardize train crew's health and safety. Nonetheless, a preliminary review of all empirical evidence for train crew fatigue is still lacking. The aim of the present paper is, therefore, to provide a preliminary description of occupational fatigue in the rail industry. This paper reviews the literature with the research question examining the risk factors associated with train crew fatigue, covering both papers published...

  8. Safety review and approval process for the TFTR

    International Nuclear Information System (INIS)

    Levine, J.D.; Howe, H.J.; Howe, K.E.

    1983-01-01

    The design, construction, and operation of the Tokamak Fusion Test Reactor (TFTR) has undergone an extensive safety and enviromental analysis involving Princeton Plasma Physics Laboratory (PPPL), the U.S. Department of Energy (DOE), the Ebasco/Grumman Industrial Subcontractor Team, and other organizations. This analysis, which is continuing during the TFTR operational phase, has been facilitated by the preparation, review and approval of several documents, including an Environmental Statement (Draft and Final), a Preliminary Safety Analysis Report (PSAR), a Final Safety Analysis Report (FSAR), Operations Safety Requirements (OSRs) and Safety Requirements (SRs), and various Operating and Maintenance Manuals. Through TFTR Safety Group participation in formal system design evaluations, change control boards, and reviews of project procurement and installation documentation, the TFTR Management Configuration Control System assures that all aspects of the project, including proposed design, installation and operational changes, receive prompt and thorough safety analyses. These efforts will continue as the TFTR Program moves into the neutral beam and D-T operational phases. The safety review and approval experience that has been acquired on the TFTR Project should serve as a foundation for similar efforts on future fusion devices

  9. Safety performance of preliminary KALIMER conceptual design

    Energy Technology Data Exchange (ETDEWEB)

    Hahn Dohee; Kim Kyoungdoo; Kwon Youngmin; Chang Wonpyo; Suk Soodong [Korea atomic Energy Resarch Inst., Taejon (Korea)

    1999-07-01

    The Korea Atomic Energy Research Institute (KAERI) is developing KALIMER (Korea Advanced Liquid Metal Reactor), which is a sodium cooled, 150 MWe pool-type reactor. The safety design of KALIMER emphasizes accident prevention by using passive processes, which can be accomplished by the safety design objectives including the utilization of inherent safety features. In order to assess the effectiveness of the inherent safety features in achieving the safety design objectives, a preliminary evaluation of ATWS performance for the KALIMER design has been performed with SSC-K code, which is a modified version of SSC-L code. KAERI's modification of the code includes development of reactivity feedback models for the core and a pool model for KALIMER reactor vessel. This paper describes the models for control rod driveline expansion, gas expansion module and the thermal hydraulic model for reactor pool and the results of preliminary analyses for unprotected loss of flow and loss o heat sink. (author)

  10. Safety performance of preliminary KALIMER conceptual design

    International Nuclear Information System (INIS)

    Hahn Dohee; Kim Kyoungdoo; Kwon Youngmin; Chang Wonpyo; Suk Soodong

    1999-01-01

    The Korea Atomic Energy Research Institute (KAERI) is developing KALIMER (Korea Advanced Liquid Metal Reactor), which is a sodium cooled, 150 MWe pool-type reactor. The safety design of KALIMER emphasizes accident prevention by using passive processes, which can be accomplished by the safety design objectives including the utilization of inherent safety features. In order to assess the effectiveness of the inherent safety features in achieving the safety design objectives, a preliminary evaluation of ATWS performance for the KALIMER design has been performed with SSC-K code, which is a modified version of SSC-L code. KAERI's modification of the code includes development of reactivity feedback models for the core and a pool model for KALIMER reactor vessel. This paper describes the models for control rod driveline expansion, gas expansion module and the thermal hydraulic model for reactor pool and the results of preliminary analyses for unprotected loss of flow and loss o heat sink. (author)

  11. Preliminary standard review guide for Environmental Restoration/Decontamination and Decommissioning safety analyses

    International Nuclear Information System (INIS)

    Ellingson, D.R.

    1993-06-01

    The review guide is based on the shared experiences, approaches, and philosophies of the Environmental Restoration/Decontamination and Decommissioning (ER/D ampersand D) subgroup members. It is presented in the form of a review guide to maximize the benefit to both the safety analyses practitioner and reviewer. The guide focuses on those challenges that tend to be unique to ER/D ampersand D cleanup activities. Some of these experiences, approaches, and philosophies may find application or be beneficial to a broader spectrum of activities such as terminal cleanout or even new operations. Challenges unique to ER/D ampersand D activities include (1) consent agreements requiring activity startup on designated dates; (2) the increased uncertainty of specific hazards; and (3) the highly variable activities covered under the broad category of ER/D ampersand D. These unique challenges are in addition to the challenges encountered in all activities; e.g., new and changing requirements and multiple interpretations. The experiences in approaches, methods, and solutions to the challenges are documented from the practitioner and reviewer's perspective, thereby providing the viewpoints on why a direction was taken and the concerns expressed. Site cleanup consent agreements with predetermined dates for restoration activity startup add the dimension of imposed punitive actions for failure to meet the date. Approval of the safety analysis is a prerequisite to startup. Actions that increase expediency are (1) assuring activity safety; (2) documenting that assurance; and (3) acquiring the necessary approvals. These actions increase the timeliness of startup and decrease the potential for punitive action. Improvement in expediency has been achieved by using safety analysis techniques to provide input to the line management decision process rather than as a review of line management decisions. Expediency is also improved by sharing the safety input and resultant decisions with

  12. Joint SKI and SSI review of SKB preliminary safety assessment of repository for long-lived low- and intermediate-level waste. Review report

    International Nuclear Information System (INIS)

    2001-03-01

    SKI and SSI find that SKB's first proper safety assessment of the SFL 3-5 repositories provides a valuable springboard for continued efforts in this field. Even though the safety assessment is relatively limited in scope, it has numerous merits. The specific problems associated with the chosen repository concept for SFL 3-5 are discussed in a generally transparent manner. On the other hand, the authorities consider that SKB have only partly achieved the expressed goal of studying the significance of the current repository design and the choice of site. The greatest deficiency consists in that neither internal disturbances (such as considerable cracking or degradation of concrete structures) nor external disturbances (such as the effects of climate changes and glaciation) have been addressed in a thorough manner. A coherent report justifying the design choice from a long-term safety perspective is, in large part, not found here. SKI and SSI recommend that SKB provide a comparison with other possible SFL 3-5 repository designs. Depending upon, among other factors, what geospheric and biospheric conditions are assumed, SKB have shown that the calculated dose values could be relatively high for certain cases. More realistic assessments would be needed to draw reasonable comparisons between different sites, and to evaluate the importance of different nuclides in different contexts. Our review of SKBs preliminary safety assessment indicates that a great deal of research and development work remains to be done before the level of knowledge in this field is comparable with that associated with the final repository for spent fuel. This is reflected with unanimity in the international expert committee's review, and in the consultants' reviews. SKI and SSI wish to point out in particular the fact that comparison with SFR is of limited value, since the safety associated with SFL 3- 5 must be assessed on a much longer time scale. SKI and SSI find it remarkable that SKB have

  13. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  14. Preliminary safety assessment of the WIPP facility

    International Nuclear Information System (INIS)

    Balestri, R.J.; Torres, B.W.; Pahwa, S.B.; Brannen, J.P.

    1979-01-01

    This paper summarizes the efforts to perform a safety assessment of the Waste Isolation Pilot Plant (WIPP) facility being proposed for southeastern New Mexico. This preliminary safety assessment is limited to a consequence assessment in terms of the dose to a maximally exposed individual as a result of introducing the radionuclides into the biosphere. The extremely low doses to the organs as a result of the liquid breach scenarios are contrasted with the background radiation

  15. Preliminary safety analysis report for the TFTR

    International Nuclear Information System (INIS)

    Lind, K.E.; Levine, J.D.; Howe, H.J.

    A Preliminary Safety Analysis Report has been prepared for the Tokamak Fusion Test Reactor. No accident scenarios have been identified which would result in exposures to on-site personnel or the general public in excess of the guidelines defined for the project by DOE

  16. Preliminary safety analysis of the Gorleben site

    International Nuclear Information System (INIS)

    Bracke, G.; Fischer-Appelt, K.

    2014-01-01

    The safety requirements governing the final disposal of heat-generating radioactive waste in Germany were implemented by the Federal Ministry of Environment, Natural Conservation and Nuclear Safety (BMU) in 2010. The Ministry considers as a fundamental objective the protection of man and the environment against the hazards of radioactive waste. Unreasonable burdens and obligation for future generations shall be avoided. The main safety principles are concentration and inclusion of radioactive and other pollutants in a containment-providing rock zone. Any release of radioactive nuclides may increase the risk for men and the environment only negligibly compared to natural radiation exposure. No intervention or maintenance work shall be necessary in the post-closure phase. Retrieval/recovery of the waste shall be possible up to 500 years after closure. The Gorleben salt dome has been discussed since the 1970's as a possible repository site for heat-generating radioactive waste in Germany. The objective of the project preliminary safety analysis of the Gorleben site (VSG) was to assess if repository concepts at the Gorleben site or other sites with a comparable geology could comply with these requirements based on currently available knowledge (Fischer-Appelt, 2013; Bracke, 2013). In addition to this it was assessed if methodological approaches can be used for a future site selection procedure and which technological and conceptual considerations can be transferred to other geological situations. The objective included the compilation and review of the available exploration data of the Gorleben site and on disposal in salt rock, the development of repository designs, and the identification of the needs for future R and D work and further site investigations. (authors)

  17. Preliminary Safety Analysis Report for the Tokamak Physics Experiment

    International Nuclear Information System (INIS)

    Motloch, C.G.; Bonney, R.F.; Levine, J.D.; Masson, L.S.; Commander, J.C.

    1995-04-01

    This Preliminary Safety Analysis Report (PSAR), includes an indication of the magnitude of facility hazards, complexity of facility operations, and the stage of the facility life-cycle. It presents the results of safety analyses, safety assurance programs, identified vulnerabilities, compensatory measures, and, in general, the rationale describing why the Tokamak Physics Experiment (TPX) can be safely operated. It discusses application of the graded approach to the TPX safety analysis, including the basis for using Department of Energy (DOE) Order 5480.23 and DOE-STD-3009-94 in the development of the PSAR

  18. Joint SKI and SSI review of SKB preliminary safety assessment of repository for long-lived low- and intermediate-level waste. Review report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    SKI and SSI find that SKB's first proper safety assessment of the SFL 3-5 repositories provides a valuable springboard for continued efforts in this field. Even though the safety assessment is relatively limited in scope, it has numerous merits. The specific problems associated with the chosen repository concept for SFL 3-5 are discussed in a generally transparent manner. On the other hand, the authorities consider that SKB have only partly achieved the expressed goal of studying the significance of the current repository design and the choice of site. The greatest deficiency consists in that neither internal disturbances (such as considerable cracking or degradation of concrete structures) nor external disturbances (such as the effects of climate changes and glaciation) have been addressed in a thorough manner. A coherent report justifying the design choice from a long-term safety perspective is, in large part, not found here. SKI and SSI recommend that SKB provide a comparison with other possible SFL 3-5 repository designs. Depending upon, among other factors, what geospheric and biospheric conditions are assumed, SKB have shown that the calculated dose values could be relatively high for certain cases. More realistic assessments would be needed to draw reasonable comparisons between different sites, and to evaluate the importance of different nuclides in different contexts. Our review of SKBs preliminary safety assessment indicates that a great deal of research and development work remains to be done before the level of knowledge in this field is comparable with that associated with the final repository for spent fuel. This is reflected with unanimity in the international expert committee's review, and in the consultants' reviews. SKI and SSI wish to point out in particular the fact that comparison with SFR is of limited value, since the safety associated with SFL 3- 5 must be assessed on a much longer time scale. SKI and SSI find it remarkable

  19. Preliminary safety assessment and preliminary safety report for the treated radwaste store, Winfrith

    International Nuclear Information System (INIS)

    Staples, A.T.

    1992-06-01

    It is the purpose of this assessment to define the categorisation of the Treated Radwaste Store, TRS, B55 at the Winfrith Technology Centre. Its further purpose is to cover all relevant sections required for a Preliminary Safety Report (PSR) encompassing the TRS and the integral Quality Assessment Unit (QUA). The TRS is designed for the interim storage of intermediate level radioactive wastes. All waste material stored in the TRS will be contained within 500 litre stainless steel drums acceptable to NIREX. It is proposed that the TRS will receive 500 litre stainless steel NIREX drums containing either irradiated DRAGON fuel or encapsulated sludge waste. (author)

  20. Preliminary study on improving safety culture in Malaysian nuclear industries

    International Nuclear Information System (INIS)

    Ibrahim, Sabariah Kader; Lee, Y. E.

    2012-01-01

    This paper presents preliminary study on safety culture and its implementation in Malaysian nuclear industries by realizing the importance of safety culture; identification of important safety culture attributes; safety culture assessment and the practices to incorporate the identified safety culture attributes in organization. The first section of this paper explains the terms and definitions related to safety culture. Second, for the realization of importance of safety culture in organization, the international operational experiences emphasizing the importance of safety culture are described. Third, important safety culture attributes which are frequently cited in literature are provided. Fourth, methods to assess safety culture in operating organization are described. Finally, the practices to enhance the safety culture in an organization are discussed

  1. Preliminary study on improving safety culture in Malaysian nuclear industries

    Energy Technology Data Exchange (ETDEWEB)

    Ibrahim, Sabariah Kader [KAIST, Daejeon (Korea, Republic of); Lee, Y. E. [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-10-15

    This paper presents preliminary study on safety culture and its implementation in Malaysian nuclear industries by realizing the importance of safety culture; identification of important safety culture attributes; safety culture assessment and the practices to incorporate the identified safety culture attributes in organization. The first section of this paper explains the terms and definitions related to safety culture. Second, for the realization of importance of safety culture in organization, the international operational experiences emphasizing the importance of safety culture are described. Third, important safety culture attributes which are frequently cited in literature are provided. Fourth, methods to assess safety culture in operating organization are described. Finally, the practices to enhance the safety culture in an organization are discussed.

  2. Medication safety programs in primary care: a scoping review.

    Science.gov (United States)

    Khalil, Hanan; Shahid, Monica; Roughead, Libby

    2017-10-01

    Medication safety plays an essential role in all healthcare organizations; improving this area is paramount to quality and safety of any wider healthcare program. While several medication safety programs in the hospital setting have been described and the associated impact on patient safety evaluated, no systematic reviews have described the impact of medication safety programs in the primary care setting. A preliminary search of the literature demonstrated that no systematic reviews, meta-analysis or scoping reviews have reported on medication safety programs in primary care; instead they have focused on specific interventions such as medication reconciliation or computerized physician order entry. This scoping review sought to map the current medication safety programs used in primary care. The current scoping review sought to examine the characteristics of medication safety programs in the primary care setting and to map evidence on the outcome measures used to assess the effectiveness of medication safety programs in improving patient safety. The current review considered participants of any age and any condition using care obtained from any primary care services. We considered studies that focussed on the characteristics of medication safety programs and the outcome measures used to measure the effectiveness of these programs on patient safety in the primary care setting. The context of this review was primary care settings, primary healthcare organizations, general practitioner clinics, outpatient clinics and any other clinics that do not classify patients as inpatients. We considered all quantitative studied published in English. A three-step search strategy was utilized in this review. Data were extracted from the included studies to address the review question. The data extracted included type of medication safety program, author, country of origin, aims and purpose of the study, study population, method, comparator, context, main findings and outcome

  3. Development of Safety Review Guide for the Periodic Safety Review of Reactor Vessel Internals

    International Nuclear Information System (INIS)

    Park, Jeongsoon; Ko, Hanok; Kim, Seonjae; Jhung, Myungjo

    2013-01-01

    Aging management of the reactor vessel internals (RVIs) is one of the important issues for long-term operation of nuclear power plants (NPPs). Safety review on the assessment and management of the RVI aging is conducted through the process of a periodic safety review (PSR). The regulatory body should check that reactor facilities sustain safety functions in light of degradation due to aging and that the operator of a nuclear power reactor establishes and implements management program to deal with degradation due to aging in order to guarantee the safety functions and the safety margin as a result of PSR. KINS(Korea Institute of Nuclear Safety) has utilized safety review guides (SRG) which provide guidance to KINS staffs in performing safety reviews in order to assure the quality and uniformity of staff safety reviews. The KINS SRGs for the continued operation of pressurized water reactors (PWRs) published in 2006 contain areas of review regarding aging management of RVIs in chapter 2 (III.2.15, Appendix 2.0.1). However unlike the SRGs for the continued operation, KINS has not officially published the SRGs for the PSR of PWRs, but published them as a form of the research report. In addition to that, the report provides almost same review procedures for aging assessment and management of RVIs with the ones provided in the SRGs for the continued operation, it cannot provide review guidance specific to PSRs. Therefore, a PSR safety review guide should be developed for RVIs in PWRs. In this study, a draft PSR safety review guide for reactor vessel internals in PWRs is developed and provided. In this paper, a draft PSR safety review guide for reactor vessel internals (PSR SRG-RVIs) in PWRs is introduced and main contents of the draft are provided. However, since the PSR safety review guides for areas other than RVIs in the pressurized water reactors (PWRs) are expected to be developed in the near future, the draft PSR SRG-RVIs should be revisited to be compatible with

  4. Preliminary safety evaluation for CSR1000 with passive safety system

    International Nuclear Information System (INIS)

    Wu, Pan; Gou, Junli; Shan, Jianqiang; Zhang, Bo; Li, Xiang

    2014-01-01

    Highlights: • The basic information of a Chinese SCWR concept CSR1000 is introduced. • An innovative passive safety system is proposed for CSR1000. • 6 Transients and 3 accidents are analysed with system code SCTRAN. • The passive safety systems greatly mitigate the consequences of these incidents. • The inherent safety of CSR1000 is enhanced. - Abstract: This paper describes the preliminary safety analysis of the Chinese Supercritical water cooled Reactor (CSR1000), which is proposed by Nuclear Power Institute of China (NPIC). The two-pass core design applied to CSR1000 decreases the fuel cladding temperature and flattens the power distribution of the core at normal operation condition. Each fuel assembly is made up of four sub-assemblies with downward-flow water rods, which is favorable to the core cooling during abnormal conditions due to the large water inventory of the water rods. Additionally, a passive safety system is proposed for CSR1000 to increase the safety reliability at abnormal conditions. In this paper, accidents of “pump seizure”, “loss of coolant flow accidents (LOFA)”, “core depressurization”, as well as some typical transients are analysed with code SCTRAN, which is a one-dimensional safety analysis code for SCWRs. The results indicate that the maximum cladding surface temperatures (MCST), which is the most important safety criterion, of the both passes in the mentioned incidents are all below the safety criterion by a large margin. The sensitivity analyses of the delay time of RCPs trip in “loss of offsite power” and the delay time of RMT actuation in “loss of coolant flowrate” were also included in this paper. The analyses have shown that the core design of CSR1000 is feasible and the proposed passive safety system is capable of mitigating the consequences of the selected abnormalities

  5. Regulatory review of NPP Krsko Periodic Safety Review

    International Nuclear Information System (INIS)

    Lovincic, D.; Muehleisen, A.; Persic, A.

    2004-01-01

    At the request of the Slovenian Nuclear Safety Administration (SNSA), Krsko NPP prepared a Periodic Safety Review (PSR) program in January 2001. This is the first PSR of NPP Krsko, the only nuclear power plant in Slovenia. The program was reviewed by the IAEA mission in May 2001 and approved by SNSA in July 2001. The program is made in accordance with the IAEA Safety Guide 'Periodic Safety Review of Operational Nuclear Power Plants' No. 50-SG-012 and with European practice. It contains a systematic review of operation of the NPP Krsko, including the review of the changes as a result of the modernization of the facility. The main tasks of PSR are review of plant status for each safety factor, development of aging and life cycle management program, review of seismic design and PSHA analysis and update of regulatory compliance program. The prioritization process of findings and action plan are also important tasks of PSR. The basic safety factors of the PSR review are: Operational Experience, Safety Assessment and Analyses, Equipment Qualification and Ageing Management, Safety Culture, Emergency Planing, Environmental Impact and Radioactive Waste, Compliance with license requirements and Prioritization. It had been agreed that SNSA will have reviewed all PSR reports generated during the PSR process. At the end of 2003 the PSR Summary Report with selected recommendations for action plan was completed and delivered to SNSA for review. The paper presents regulatory review of NPP Krsko PSR with emphasis on the evaluation of the PSR issues ranking process. (author)

  6. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    , considering also uncertainties; The preliminary layout will take earthquake risks into account by means of respect distances to major structures of the host rock. The methodology for determining respect distances is under development; Also, the size of the area designated for canister deposition will be determined with regard to the estimated fraction of usable deposition positions. Positions with e.g. a flow higher than a given limit, yet to be established, will be avoided. The safety assessment group will review the above results within the PSE, assessing the need for more sophisticated analyses in a comprehensive safety assessment, and the possible implications this has for continued site investigations. Flow and transport trajectories in the host rock will be calculated using the flow models set up within the site modelling project, probably for several alternative models. Radionuclide release and dose calculations will then be carried out with simplified analytic models and sensitivity analyses will be made on the results of these calculations. The results will provide feedback on portions of the host rock where more detailed hydraulic knowledge is required, on whether some of the suggested deposition positions are less favourable from the point of view of radionuclide transport and on discharge areas for which the biosphere may require additional characterisation. Furthermore, the sensitivity analyses, which will include also non site specific uncertain variables, will put the host rock uncertainties in a broader perspective. Grouting needs and risk for upcoming of saline groundwater during construction and operation will be estimated by the repository engineering group, based on the hydraulic understanding of the site. The chemical influence of these phenomena will be evaluated by the safety assessment group and feedback will be given as to whether the design needs modification to meet long-term safety requirements. The ore potential of the sites will be assessed and

  7. Keeping rail on track: preliminary findings on safety culture in Australian rail.

    Science.gov (United States)

    Blewett, Verna; Rainbird, Sophia; Dorrian, Jill; Paterson, Jessica; Cattani, Marcus

    2012-01-01

    'Safety culture' is identified in the literature as a critical element of healthy and safe workplaces. How can rail organizations ensure that consistently effective work health and safety cultures are maintained across the diversity of their operations? This paper reports on research that is currently underway in the Australian rail industry aimed at producing a Model of Best Practice in Safety Culture for the industry. Located in rail organizations dedicated to the mining industry as well as urban rail and national freight operations, the research examines the constructs of organizational culture that impact on the development and maintenance of healthy and safe workplaces. The research uses a multi-method approach incorporating quantitative (survey) and qualitative (focus groups, interviews and document analysis) methods along with a participative process to identify interventions to improve the organization and develop plans for their implementation. The research uses as its analytical framework the 10 Platinum Rules, from the findings of earlier research in the New South Wales (Australia) mining industry, Digging Deeper. Data collection is underway at the time of writing and preliminary findings are presented at this stage. The research method may be adapted for use as a form of organizational review of safety and health in organizational culture.

  8. Preliminary safety design analysis of KALIMER

    Energy Technology Data Exchange (ETDEWEB)

    Suk, Soo Dong; Kwon, Y. M.; Kim, K. D. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-03-01

    The national long-term R and D program updated in 1997 requires Korea Atomic Energy Research Institute(KAERI) to complete by the year 2006 the basic design of Korea Advanced Liquid Metal Reactor (KALIMER), along with supporting R and D work, with the capability of resolving the issue of spent fuel storage as well as with significantly enhanced safety. KALIMER is a 150 MWe pool-type sodium cooled prototype reactor that uses metallic fuel. The conceptual design is currently under way to establish a self consistent design meeting a set of the major safety design requirements for accident prevention. Some of current emphasis include those for inherent and passive means of negative reactivity insertion and decay heat removal, high shutdown reliability, prevention of and protection from sodium chemical reaction, and high seismic margin, among others. All of these requirements affect the reactor design significantly and involve supporting R and D programs of substance. This document first introduces a set of safety design requirements and accident evaluation criteria established for the conceptual design of KALIMER and then summarizes some of the preliminary results of engineering and design analyses performed for the safety of KALIMER. 19 refs., 19 figs., 6 tabs. (Author)

  9. A Preliminary Review of Fatigue Among Rail Staff

    Directory of Open Access Journals (Sweden)

    Jialin Fan

    2018-05-01

    Full Text Available Background: Fatigue is a severe problem in the rail industry, which may jeopardize train crew's health and safety. Nonetheless, a preliminary review of all empirical evidence for train crew fatigue is still lacking. The aim of the present paper is, therefore, to provide a preliminary description of occupational fatigue in the rail industry. This paper reviews the literature with the research question examining the risk factors associated with train crew fatigue, covering both papers published in refereed journals and reports from trade organizations and regulators. It assesses the progress of research on railway fatigue, including research on the main risk factors for railway fatigue, the association between fatigue and railway incidents, and how to better manage fatigue in the railway industry.Methods: Systematic searches were performed in both science and industry databases. The searches considered studies published before August 2017. The main exclusion criterion was fatigue not being directly measured through subjective or objective methods.Results: A total of 31 studies were included in the main review. The causes of fatigue included long working hours, heavy workload, early morning or night shifts, and insufficient sleep. Poor working environment, particular job roles, and individual differences also contributed to fatigue.Conclusion: Fatigue in the rail industry includes most of the features of occupational fatigue, and it is also subject to industry-specific factors. The effect of fatigue on well-being and the fatigued population in the railway industry are still not clear. Future studies can consider associations between occupational risk factors and perceived fatigue by examining the prevalence of fatigue and identifying the potential risk factors in staff within the railway industry.

  10. Regulatory review of safety cases and safety assessments - associated challenges

    International Nuclear Information System (INIS)

    Bennett, D.G.; Ben Belfadhel, M.; Metcalf, P.E.

    2006-01-01

    Regulatory reviews of safety cases and safety assessments are essential for credible decision making on the licensing or authorization of radioactive waste disposal facilities. Regulatory review also plays an important role in developing the safety case and in establishing stakeholders' confidence in the safety of the facility. Reviews of safety cases for radioactive waste disposal facilities need to be conducted by suitably qualified and experienced staff, following systematic and well planned review processes. Regulatory reviews should be sufficiently comprehensive in their coverage of issues potentially affecting the safety of the disposal system, and should assess the safety case against clearly established criteria. The conclusions drawn from a regulatory review, and the rationale for them should be reproducible and documented in a transparent and traceable way. Many challenges are faced when conducting regulatory reviews of safety cases. Some of these relate to issues of project and programme management, and resources, while others derive from the inherent difficulties of assessing the potential long term future behaviour of engineered and environmental systems. The paper describes approaches to the conduct of regulatory reviews and discusses some of the challenges faced. (author)

  11. Nuclear Safety Review 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-15

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis.

  12. Nuclear Safety Review 2013

    International Nuclear Information System (INIS)

    2013-07-01

    The Nuclear Safety Review 2013 focuses on the dominant nuclear safety trends, issues and challenges in 2012. The Executive Overview provides crosscutting and worldwide nuclear safety information along with a summary of the major sections covered in this report. Sections A-E of this report cover improving radiation, transport and waste safety; strengthening safety in nuclear installations; improving regulatory infrastructure and effectiveness; enhancing emergency preparedness and response (EPR); and civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the IAEA Safety Standards. The world nuclear community has made noteworthy progress in strengthening nuclear safety in 2012, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as ''the Action Plan''). For example, an overwhelming majority of Member States with operating nuclear power plants (NPPs) have undertaken and essentially completed comprehensive safety reassessments ('stress tests') with the aim of evaluating the design and safety aspects of plant robustness to protect against extreme events, including: defence in depth, safety margins, cliff edge effects, multiple failures, and the prolonged loss of support systems. As a result, many have introduced additional safety measures including mitigation of station blackout. Moreover, the IAEA's peer review services and safety standards have been reviewed and strengthened where needed. Capacity building programmes have been built or improved, and EPR programmes have also been reviewed and improved. Furthermore, in 2012, the IAEA continued to share lessons learned from the Fukushima Daiichi accident with the nuclear community including through three international experts' meetings (IEMs) on reactor and spent fuel safety, communication in the event of a nuclear or radiological emergency, and protection against extreme earthquakes and tsunamis

  13. Review of SKB's Safety Assessment SR-Can: Contributions in Support of SKI's and SSI's Review by External Consultants

    International Nuclear Information System (INIS)

    2008-03-01

    The Swedish Nuclear Fuel and Waste Management Co (SKB) plans to submit a license application for the construction of a repository for spent nuclear fuel in Sweden 2010. In support of this application SKB will present a safety report, SR-Site, on the repository's long-term safety and radiological consequences. As a preparation for SR-Site, SKB published the preliminary safety assessment SR-Can in November 2006. The purposes were to document a first evaluation of long-term safety for the two candidate sites at Forsmark and Laxemar and to provide feedback to SKB's future programme of work. An important objective of the authorities' review of SR-Can is to provide guidance to SKB on the complete safety reporting for the license application. The authorities have engaged external experts for independent modelling, analysis and review, with the aim to provide a range of expert opinions related to the sufficiency and appropriateness of various aspects of SR-Can. The conclusions and judgments in this report are those of the authors and may not necessarily coincide with those of SKI and SSI. The authorities own review will be published separately (SKI Report 2008:23, SSI Report 2008:04 E). This report compiles contributions from several specific research projects. The separate reviews cover topics regarding the engineered barrier system, the quality assurance, the climate evolution and its effects, and the ecosystems and environmental impacts. All contributions are in English apart from the review concerning ecosystems and environmental impacts, which is presented in Swedish

  14. Periodic safety review of the HTR-10 safety analysis

    International Nuclear Information System (INIS)

    Chen Fubing; Zheng Yanhua; Shi Lei; Li Fu

    2015-01-01

    Designed by the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University, the 10 MW High Temperature Gas-cooled Reactor-Test Module (HTR-10) is the first modular High Temperature Gas-cooled Reactor (HTGR) in China. According to the nuclear safety regulations of China, the periodic safety review (PSR) of the HTR-10 was initiated by INET after approved by the National Nuclear Safety Administration (NNSA) of China. Safety analysis of the HTR-10 is one of the key safety factors of the PSR. In this paper, the main contents in the review of safety analysis are summarized; meanwhile, the internal evaluation on the review results is presented by INET. (authors)

  15. SKI's and SSI's review of SKB's safety report SR-Can

    International Nuclear Information System (INIS)

    Dverstorp, Bjoern; Stroemberg, Bo

    2008-03-01

    This report summarises SKI's and SSI's joint review of the Swedish Nuclear Fuel and Waste Management Co's (SKB) safety report SR-Can (SKB TR-06-09). SR-Can is the first assessment of post-closure safety for a KBS-3 spent nuclear fuel repository at the candidate sites Forsmark and Laxemar, respectively. The analysis builds on data from the initial stage of SKB's surface-based site investigations and on data from full-scale manufacturing and testing of buffer and copper canisters. SR-Can can be regarded as a preliminary version of the safety report that will be required in connection with SKB's planned licence application for a final repository in late 2009. The main purpose of the authorities' review is to provide feedback to SKB on their safety reporting as part of the pre-licensing consultation process. However, SR-Can is not part of the formal licensing process. In support of the authorities' review three international peer review teams were set up to make independent reviews of SR-Can from three perspectives, namely integration of site data, representation of the engineered barriers and safety assessment methodology, respectively. Further, several external experts and consultants have been engaged to review detailed technical and scientific issues in SR-Can. The municipalities of Oesthammar and Oskarshamn where SKB is conducting site investigations, as well NGOs involved in SKB's programme, have been invited to provide their views on SR-Can as input to the authorities' review. Finally, the authorities themselves, and with the help of consultants, have used independent models to reproduce part of SKB's calculations and to make complementary calculations. All supporting review documents are published in SKI's and SSI's report series. The main findings of the review are: -SKB's safety assessment methodology is overall in accordance with applicable regulations, but part of the methodology needs to be further developed for the licence application. -SKB's quality

  16. KHNP special safety review

    International Nuclear Information System (INIS)

    Lee, Tae-Ho; Lee, Bang-Jin; Lee, Soung-Hee; Park, Goon-Cherl

    2009-01-01

    Commemorating the 30 year anniversary of commercial nuclear power plant operation in KOREA, Korea Hydro and Nuclear Power Co., Ltd. (KHNP) has conducted a Special Safety Review (SSR) of its 20 operating units to understand their safety performance and to identify any areas that need improvement. The SSR reviewed all 20 operating units for 2 weeks per site. Areas that were reviewed are Safety Margins, Plant Performance, Employee Safety, Employee Performance and Performance Improvement Process. Each review team consisted of international and domestic members. The international reviewers were from IAEA, WANO and INPO. The domestic reviewers consisted of professors, Engineering Company, Research Institute and KHNP experts. The review confirmed safe and reliable operations of the 20 nuclear units. The common understanding resulted from the SSR is as follows. Firstly, KHNP corporate and its plants confirmed and shared mutual understanding on recurring areas for improvements, especially in the areas of Organizational Effectiveness, Industrial Safety, Human Performance, Configuration Management, Operations, Equipment Performance and Material Condition. Secondly, KHNP understood that plant and department level performances are directly related to the leadership and competency of the management team including supervisors. Thirdly, the strengths of individual stations that consistently have produced good results need to be shared with the other KHNP stations. Finally, KHNP learned that strong corporate leadership and support are needed to resolve most of the areas for improvement since they are common to all KHNP stations. (author)

  17. Regulatory review of safety cases and safety assessments for near surface

    International Nuclear Information System (INIS)

    Nys, V.

    2003-01-01

    The activities of the ASAM Regulatory Review Working Group are presented. Regulatory review of the safety assessment is made. It includes the regulatory review of post-closure safety assessment; safety case development and confidence building. The ISAM methodology is reviewed and SA system description is presented. Recommendations on the review process management are given

  18. Preliminary safety evaluation of the Gas Turbine-Modular Helium Reactor (GT-MHR)

    International Nuclear Information System (INIS)

    Dunn, T.D.; Lommers, L.J.; Tangirala, V.E.

    1994-04-01

    A qualitative comparison between the safety characteristics of the Gas Turbine-Modular Helium Reactor (GT-MHR) and those of the steam cycle shows that the two designs achieve equivalent levels of overall safety performance. This comparison is obtained by applying the scaling laws to detailed steam-cycle computations as well as the conclusions obtained from preliminary GT-MHR model simulations. The gas turbine design is predicted to be superior for some event categories, while the steam cycle design is better for others. From a safety perspective, the GT-MHR has a modest advantage for pressurized conduction cooldown events. Recent computational simulations of 102 column, 550 MW(t) GT-MHR during a depressurized conduction cooldown show that peak fuel temperatures are within the limits. The GT-MHR has a significantly lower risk due to water ingress events under operating conditions. Two additional scenarios, namely loss of load event and turbine deblading event that are specific to the GT-MHR design are discussed. Preliminary evaluation of the GT-MHR's safety characteristics indicate that the GT-MHR can be expected to satisfy or exceed its safety requirements

  19. Safety review advisor

    International Nuclear Information System (INIS)

    Boshers, J.A.; Uhrig, R.E.; Alguindigue, I.A.; Burnett, C.G.

    1991-01-01

    The University of Tennessee's Nuclear Engineering department, in cooperation with the Tennessee Valley Authority (TVA), is evaluating the feasibility of utilizing an expert system to aid in 10CFR50.59 evaluations. This paper discusses the history of 10CFR50.59 reviews, and details the development approach used in the construction of a prototype Safety Review Advisor (SRA). The goals for this expert system prototype are to aid the engineer in the evaluation process by directing his attention to the appropriate critical issues, increase the efficiency, consistency, and thoroughness of the evaluation process, and provide a foundation of appropriate Safety Analysis Report (SAR) references for the reviewer

  20. Preliminary safety evaluation for the spent nuclear fuel project`s cold vacuum drying system

    Energy Technology Data Exchange (ETDEWEB)

    Garvin, L.J., Westinghouse Hanford

    1996-07-01

    This preliminary safety evaluation (PSE) considers only the Cold Vacuum Drying System (CVDS) facility and its mission as it relates to the integrated process strategy (WHC 1995). The purpose of the PSE is to identify those CBDS design functions that may require safety- class and safety-significant accident prevention and mitigation features.

  1. IAEA Expert Team Completes Mission to Review Japan's Nuclear Power Plant Safety Assessment Process, 31 January 2012, Tokyo, Japan

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: A team of international nuclear safety experts today completed a review of Japan's two-stage process for assessing nuclear safety at the nation's nuclear power plants. The team began its work on 23 January and delivered a Preliminary Summary Report to Japanese officials today and plans to finish the final report by the end of February. National safety assessments and their peer review by the IAEA are a key component of the IAEA's Action Plan on Nuclear Safety, which was approved by the Agency's 152 Member States following last year's nuclear accident at Fukushima Daiichi Nuclear Power Station. At the request of the Government of Japan, the International Atomic Energy Agency (IAEA) organized a 10-person team to review the Japanese Nuclear and Industrial Safety Agency's (NISA) approach to the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities and how NISA examines the results submitted by nuclear operators. The IAEA safety review mission consisted of five IAEA and three international nuclear safety experts. To help its review, the team held meetings in Tokyo with officials from NISA, the Japanese Nuclear Energy Safety (JNES) Organization, and the Kansai Electric Power Company (KEPCO), and the team visited the Ohi Nuclear Power Station to see an example of how Japan's Comprehensive Safety Assessment is being implemented by nuclear operators. 'We concluded that NISA's instructions to power plants and its review process for the Comprehensive Safety Assessments are generally consistent with IAEA Safety Standards', said team leader James Lyons, director of the IAEA's Nuclear Installation Safety Division. In its Preliminary Summary Report delivered today, the team highlighted a number of good practices and identified some improvements that would enhance the overall effectiveness of the Comprehensive Safety Assessment process. Good practices identified by the mission team include: Based on NISA instructions and commitments of the

  2. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    International Nuclear Information System (INIS)

    Lee, Yong Suk; Jung, Dae Wook; Cho, Nam Chul

    2008-01-01

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future

  3. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Suk; Jung, Dae Wook [Future and Challenges Inc., Seoul (Korea, Republic of); Cho, Nam Chul [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2008-10-15

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future.

  4. US nuclear safety review and experience

    International Nuclear Information System (INIS)

    Gilinsky, V.

    1977-01-01

    The nuclear safety review of commercial nuclear power reactors has changed over the years from the relatively simple review of Dresden 1 in 1955 to the highly complex and sophisticated regulatory process which characterizes today's reviews. Four factors have influenced this evolution: (1) maturing of the technology and industry; (2) development of the regulatory process and associated staff; (3) feedback of operating experience; and (4) public awareness and participation. The NRC's safety review responsibilities start before an application is tendered and end when the plant is decommissioned. The safety review for reactor licensing is a comprehensive, two-phase process designed to assure that all the established conservative acceptance criteria are satisfied. Operational safety is assured through a strong inspection and enforcement program which includes shutting down operating facilities when necessary to protect the health and safety of the public. The safety of operating reactors is further insured through close regulation of license changes and selective backfitting of new regulatory requirements. An effective NRC standards development program has been implemented and coordinates closely with the national standards program. A confirmatory safety research program has been developed. Both of these efforts are invaluable to the nuclear safety review because they provide the staff with key tools needed to carry out its regulatory responsibilities. Both have been given increased emphasis since the formation of the NRC in 1975. The safety review process will continue to evolve, but changes will be slower and more deliberate. It will be influenced by standardization, early site reviews and development of advanced reactor concepts. New legislation may make possible changes which will simplify and shorten the regulatory process. Certainly the experience provided by the increasing number and types of operating plants will have a very strong impact on future trends in the

  5. IAEA Issues Report on Mission to Review Japan's Nuclear Power Plant Safety Assessment Process

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: A team of international nuclear safety experts has delivered its report on a mission it conducted from 21-31 January 2012 to review Japan's process for assessing nuclear safety at the nation's nuclear power plants. International Atomic Energy Agency (IAEA) officials delivered the IAEA Mission Report to Japanese officials yesterday and made it publicly available today. Following the 11 March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station, Japan's Nuclear and Industrial Safety Agency (NISA) announced the development of a revised safety assessment process for the nation's nuclear power reactors. At the request of the Government of Japan, the IAEA organized a team of five IAEA and three international nuclear safety experts and visited Japan to review NISA's approach to the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities and how NISA examines the results submitted by nuclear operators. A Preliminary Summary Report was issued on 31 January. 'The mission report provides additional information regarding the team's recommendations and overall finding that NISA's instructions to power plants and its review process for the Comprehensive Safety Assessments are generally consistent with IAEA Safety Standards', said team leader James Lyons, Director of the IAEA's Nuclear Installation Safety Division. National safety assessments and their peer review by the IAEA are a key component of the IAEA Action Plan on Nuclear Safety, which was approved by the Agency's Member States following last year's nuclear accident at Fukushima Daiichi Nuclear Power Station. The IAEA safety review mission held meetings in Tokyo with officials from NISA, the Japanese Nuclear Energy Safety Organization (JNES), and the Kansai Electric Power Company (KEPCO), and the team visited the Ohi Nuclear Power Station to see an example of how Japan's Comprehensive Safety Assessment is being implemented by nuclear operators. In its report delivered today

  6. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  7. Safety review advisor

    International Nuclear Information System (INIS)

    Boshers, J.A.; Alguindigue, I.E.; Uhrig, R.E.

    1989-01-01

    The University of Tennessee's Nuclear Engineering Department, in cooperation with the Tennessee Valley Authority (TVA), is evaluating the feasibility of utilizing an expert system to aid in 10CFR50.59 evaluations. This paper discusses the history of 10CFR50.59 reviews, and details the development approach used in the construction of a prototype Safety Review Advisor (SRA). The goals for this expert system prototype are to (1) aid the engineer in the evaluation process by directing his attention to the appropriate critical issues, (2) increase the efficiency, consistency, and thoroughness of the evaluation process, and (3) provide a foundation of appropriate Safety Analysis Report (SAR) references for the reviewer. 6 refs., 2 figs

  8. Fuel safety criteria and review by OECD / CSNI task force

    International Nuclear Information System (INIS)

    Van Doesburg, W.

    1999-01-01

    fuel and core design, cladding materials, manufacturing processes, high burnup, MOX etc) inasmuch as they affect these criteria. This assessment aims at identifying where efforts are needed (experimental, analytical) to provide the proper basis for criteria, and to identify a possible need for readjustment of criteria. In Table 1, the safety related criteria under review are displayed; these criteria are individually reviewed against current or 'new' design elements as shown in the Table (a list of these elements is also contained in the Table). In addition a review will be made against the currently available analytical methods applied to establish - or verify compliance with - safety related criteria. The TFFSC approach taken to review the safety criteria will be presented, together with preliminary results obtained to date; Table 2 shows a list of the TFFSC review participants and individual assignments. Also the future perspective of this work, the assessment of necessary margins (outside the TFFSC working scope), will be addressed. (authors)

  9. Preliminary Development of Regulatory PSA Models for SFR

    International Nuclear Information System (INIS)

    Choi, Yong Won; Shin, Andong; Bae, Moohoon; Suh, Namduk; Lee, Yong Suk

    2013-01-01

    Well developed PRA methodology exists for LWR (Light Water Reactor) and PHWR (Pressurized Heavy Water Reactor). Since KAERI is developing a prototype SFR targeting to apply for a license by 2017, KINS needs to have a PRA models to assess the safety of this prototype reactor. The purpose of this study is to develop the regulatory PSA models for the independent verification of the SFR safety. Since the design of the prototype SFR is not mature yet, we have tried to develop the preliminary models based on the design data of KAERI's previous SFR design. In this study, the preliminary initiating events of level 1 internal event for SFR were selected through reviews of existing PRA (LWR, PRISM, ASTRID and KALIMER-600) models. Then, the event tree for each selected initiating event was developed. The regulatory PRA models of SFR developed are preliminary in a sense, because the prototype SFR design is not mature and provided yet. Still it might be utilized for the forthcoming licensing review in assessing the risk of safety issues and the configuration control of the design

  10. ESRS guidelines for software safety reviews. Reference document for the organization and conduct of Engineering Safety Review Services (ESRS) on software important to safety in nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    The IAEA provides safety review services to assist Member States in the application of safety standards and, in particular, to evaluate and facilitate improvements in nuclear power plant safety performance. Complementary to the Operational Safety Review Team (OSART) and the International Regulatory Review Team (IRRT) services are the Engineering Safety Review Services (ESRS), which include reviews of siting, external events and structural safety, design safety, fire safety, ageing management and software safety. Software is of increasing importance to safety in nuclear power plants as the use of computer based equipment and systems, controlled by software, is increasing in new and older plants. Computer based devices are used in both safety related applications (such as process control and monitoring) and safety critical applications (such as reactor protection). Their dependability can only be ensured if a systematic, fully documented and reviewable engineering process is used. The ESRS on software safety are designed to assist a nuclear power plant or a regulatory body of a Member State in the review of documentation relating to the development, application and safety assessment of software embedded in computer based systems important to safety in nuclear power plants. The software safety reviews can be tailored to the specific needs of the requesting organization. Examples of such reviews are: project planning reviews, reviews of specific issues and reviews prior final acceptance. This report gives information on the possible scope of ESRS software safety reviews and guidance on the organization and conduct of the reviews. It is aimed at Member States considering these reviews and IAEA staff and external experts performing the reviews. The ESRS software safety reviews evaluate the degree to which software documents show that the development process and the final product conform to international standards, guidelines and current practices. Recommendations are

  11. Preliminary study for unified management of CANDU safety codes and construction of database system

    International Nuclear Information System (INIS)

    Min, Byung Joo; Kim, Hyoung Tae

    2003-03-01

    It is needed to develop the Graphical User Interface(GUI) for the unified management of CANDU safety codes and to construct database system for the validation of safety codes, for which the preliminary study is done in the first stage of the present work. The input and output structures and data flow of CATHENA and PRESCON2 are investigated and the interaction of the variables between CATHENA and PRESCON2 are identified. Furthermore, PC versions of CATHENA and PRESCON2 codes are developed for the interaction of these codes and GUI(Graphic User Interface). The PC versions are assessed by comparing the calculation results with those by HP workstation or from FSAR(Final Safety Analysis Report). Preliminary study on the GUI for the safety codes in the unified management system are done. The sample of GUI programming is demonstrated preliminarily. Visual C++ is selected as the programming language for the development of GUI system. The data for Wolsong plants, reactor core, and thermal-hydraulic experiments executed in the inside and outside of the country, are collected and classified following the structure of the database system, of which two types are considered for the final web-based database system. The preliminary GUI programming for database system is demonstrated, which is updated in the future work

  12. Reviewing industrial safety in nuclear power plants

    International Nuclear Information System (INIS)

    1990-02-01

    This document contains guidance and reference materials for Operational Safety Review Team (OSART) experts, in addition to the OSART Guidelines (TECDOC-449), for use in the review of industrial safety activities at nuclear power plants. It sets out objectives for an excellent industrial safety programme, and suggests investigations which should be made in evaluating industrial safety programmes. The attributes of an excellent industrial safety programme are listed as examples for comparison. Practical hints for reviewing industrial safety are discussed, so that the necessary information can be obtained effectively through a review of documents and records, discussions with counterparts, and field observations. There are several annexes. These deal with major features of industrial safety programmes such as safety committees, reporting and investigation systems and first aid and medical facilities. They include some examples which are considered commendable. The document should be taken into account not only when reviewing management, organization and administration but also in the review of related areas, such as maintenance and operations, so that all aspects of industrial safety in an operating nuclear power plant are covered

  13. Development of web-based safety review advisory system

    International Nuclear Information System (INIS)

    Kim, M. W.; Lee, H. C.; Park, S. O.; Lee, K. H.; Hur, K. Y.; Lee, S. J.; Choi, S. S.; Kang, C. M.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS (Korea Institute of Nuclear Safety). The Safety Review Advisory System(SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  14. Research and development of technologies for safe and environmentally optimal recovery and disposal of explosive wastes. Task 2, Preliminary impact assessment for environment, health and safety (EIA)

    Energy Technology Data Exchange (ETDEWEB)

    Duijm, N.J.; Markert, F. [Risoe (Denmark); Larsen, S.G. [DEMEX A/S (Denmark)

    1998-09-01

    As described in the project proposal `Research and Development of Technologies for Safe and Environmentally optimal recovery and Disposal of Explosive Wastes`, dated 31. May 1996, the objective of Task 2, Preliminary Impact Assessment for Environment, Health and Safety, is to: Analyse the environmental impact of noise and emissions to air, water and soil; Assess the risk of hazards to workers` health and safety and to the public. Task 2, Preliminary Impact Assessment for Environment, Health and Safety (EIA), has been performed from August 1997 to September 1998. First, a methodology has been established, based on Multi-Criteria Decision Analysis (MCDA), to select the `best` technology on the basis of clearly defined objectives, including minimal impacts on environment, health and safety. This included a review of different types of explosive waste with a focus on the environment implications, identifying the issues relevant to defining the criteria or objectives with respect to environment and safety in the framework of explosive waste, as well as the preliminary definition of objectives for the final impact assessment. Second, the previously identified recovery and disposal technologies (Task 1) have been qualitatively assessed on the basis of the relevant objectives. This qualitative assessment includes also economic considerations and an attempt to rank the technologies in an MCDA framework. (au)

  15. European passive plant program preliminary safety analyses to support system design

    International Nuclear Information System (INIS)

    Saiu, Gianfranco; Barucca, Luciana; King, K.J.

    1999-01-01

    In 1994, a group of European Utilities, together with Westinghouse and its Industrial Partner GENESI (an Italian consortium including ANSALDO and FIAT), initiated a program designated EPP (European Passive Plant) to evaluate Westinghouse Passive Nuclear Plant Technology for application in Europe. In the Phase 1 of the European Passive Plant Program which was completed in 1996, a 1000 MWe passive plant reference design (EP1000) was established which conforms to the European Utility Requirements (EUR) and is expected to meet the European Safety Authorities requirements. Phase 2 of the program was initiated in 1997 with the objective of developing the Nuclear Island design details and performing supporting analyses to start development of Safety Case Report (SCR) for submittal to European Licensing Authorities. The first part of Phase 2, 'Design Definition' phase (Phase 2A) was completed at the end of 1998, the main efforts being design definition of key systems and structures, development of the Nuclear Island layout, and performing preliminary safety analyses to support design efforts. Incorporation of the EUR has been a key design requirement for the EP1000 form the beginning of the program. Detailed design solutions to meet the EUR have been defined and the safety approach has also been developed based on the EUR guidelines. The present paper describes the EP1000 approach to safety analysis and, in particular, to the Design Extension Conditions that, according to the EUR, represent the preferred method for giving consideration to the Complex Sequences and Severe Accidents at the design stage without including them in the design bases conditions. Preliminary results of some DEC analyses and an overview of the probabilistic safety assessment (PSA) are also presented. (author)

  16. Development of web-based safety review advisory system

    International Nuclear Information System (INIS)

    Kim, M. W.; Hur, K. Y.; Lee, S. J.; Choi, S. J.

    2002-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS. Safety Review Advisory System (SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described

  17. Preliminary Safety Information Document for the Standard MHTGR. Volume 1, (includes latest Amendments)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-01-01

    With NRC concurrence, the Licensing Plan for the Standard HTGR describes an application program consistent with 10CFR50, Appendix O to support a US Nuclear Regulatory Commission (NRC) review and design certification of an advanced Standard modular High Temperature Gas-Cooled Reactor (MHTGR) design. Consistent with the NRC's Advanced Reactor Policy, the Plan also outlines a series of preapplication activities which have as an objective the early issuance of an NRC Licensability Statement on the Standard MHTGR conceptual design. This Preliminary Safety Information Document (PSID) has been prepared as one of the submittals to the NRC by the US Department of Energy in support of preapplication activities on the Standard MHTGR. Other submittals to be provided include a Probabilistic Risk Assessment, a Regulatory Technology Development Plan, and an Emergency Planning Bases Report.

  18. NPP Krsko periodic safety review. Safety assessment and analyses

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Thaulez, F.

    2002-01-01

    Definition of a PSR (Periodic Safety Review) project is a comprehensive safety review of a plant after ten years of operation. The objective is a verification by means of a comprehensive review using current methods that the plant remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. The overall goals of the NEK PSR Program are defined in compliance with the basic role of a PSR and the current practice typical for most of the countries in EU. This practice is described in the related guides and good practice documents issued by international organizations. The overall goals of the NEK PSR are formulated as follows: to demonstrate that the plant is as safe as originally intended; to evaluate the actual plant status with respect to aging and wear-out identifying any structures, systems or components that could limit the life of the plant in the foreseeable future, and to identify appropriate corrective actions, where needed; to compare current level of safety in the light of modern standards and knowledge, and to identify where improvements would be beneficial for minimizing deviations at justifiable costs. The Krsko PSR will address the following safety factors: Operational Experience, Safety Assessment, EQ and Aging Management, Safety Culture, Emergency Planning, Environmental Impact and Radioactive Waste.(author)

  19. Opinions on SKB's Safety Assessments SR 97 and SFL 3-5. A Review by SKI Consultants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The Swedish Nuclear Fuel and Waste Management Co. (SKB) has presented their safety assessment 'Deep repository for spent nuclear fuel, SR 97 - Post-closure safety'. SKB's report is part of the documentation that has been required by the Government before the start of site investigations. The Swedish Nuclear Power Inspectorate (SKI) is reviewing SR 97 according to earlier Government decisions. In its review work SKI has asked several consultants, that recently have been performing research work for SKI, to give their opinions on SR 97. SKI and the Swedish Radiation Protection Institute (SSI) have used these reports from the consultants as one complementary basis for the formulation of the SKI/SSI review report. This is a compilation of the reports from the different consultants, and therefore the different contributions vary in length, style and language. Included are also two consultant reports, giving comments on SKB's preliminary safety assessment for SFL 3-5 (deep repository for long-lived low- and intermediate-level waste). The 17 contributions have all been separately indexed.

  20. Opinions on SKB's Safety Assessments SR 97 and SFL 3-5. A Review by SKI Consultants

    International Nuclear Information System (INIS)

    2000-12-01

    The Swedish Nuclear Fuel and Waste Management Co. (SKB) has presented their safety assessment 'Deep repository for spent nuclear fuel, SR 97 - Post-closure safety'. SKB's report is part of the documentation that has been required by the Government before the start of site investigations. The Swedish Nuclear Power Inspectorate (SKI) is reviewing SR 97 according to earlier Government decisions. In its review work SKI has asked several consultants, that recently have been performing research work for SKI, to give their opinions on SR 97. SKI and the Swedish Radiation Protection Institute (SSI) have used these reports from the consultants as one complementary basis for the formulation of the SKI/SSI review report. This is a compilation of the reports from the different consultants, and therefore the different contributions vary in length, style and language. Included are also two consultant reports, giving comments on SKB's preliminary safety assessment for SFL 3-5 (deep repository for long-lived low- and intermediate-level waste). The 17 contributions have all been separately indexed

  1. Nuclear safety review for the year 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6.

  2. Nuclear safety review for the year 2002

    International Nuclear Information System (INIS)

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6

  3. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  4. Nuclear Safety Review for the Year 2003

    International Nuclear Information System (INIS)

    2004-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. In line with the suggestions made by the Board of Governors in March 2002, the first part is more analytical and less descriptive. This short analytical overview is supported by a second part, which describes significant safety related events and issues worldwide during 2003. A Draft Nuclear Safety Review for the Year 2003 was submitted to the March 2004 session of the Board of Governors in document GOV/2004/3. The final version of the Nuclear Safety Review for the Year 2003 was prepared in the light of the discussion by the Board.

  5. Review of SKB's Safety Assessment SR-Can: Contributions in Support of SKI's and SSI's Review by External Consultants

    Energy Technology Data Exchange (ETDEWEB)

    2008-03-15

    The Swedish Nuclear Fuel and Waste Management Co (SKB) plans to submit a license application for the construction of a repository for spent nuclear fuel in Sweden 2010. In support of this application SKB will present a safety report, SR-Site, on the repository's long-term safety and radiological consequences. As a preparation for SR-Site, SKB published the preliminary safety assessment SR-Can in November 2006. The purposes were to document a first evaluation of long-term safety for the two candidate sites at Forsmark and Laxemar and to provide feedback to SKB's future programme of work. An important objective of the authorities' review of SR-Can is to provide guidance to SKB on the complete safety reporting for the license application. The authorities have engaged external experts for independent modelling, analysis and review, with the aim to provide a range of expert opinions related to the sufficiency and appropriateness of various aspects of SR-Can. The conclusions and judgments in this report are those of the authors and may not necessarily coincide with those of SKI and SSI. The authorities own review will be published separately (SKI Report 2008:23, SSI Report 2008:04 E). This report compiles contributions from several specific research projects. The separate reviews cover topics regarding the engineered barrier system, the quality assurance, the climate evolution and its effects, and the ecosystems and environmental impacts. All contributions are in English apart from the review concerning ecosystems and environmental impacts, which is presented in Swedish

  6. Research on review technology for three key safety factors of periodic safety review (PSR) and its application to Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Xu Shoulv; Yao Weida; Dou Yikang; Lin Shaoxuan; Cao Yenan; Zhou Quanfu; Zheng Jiong; Zhang Ming

    2009-04-01

    In 2001, after 10 years' operation, Qinshan Nuclear Power Plant (Q1) started to carry out periodic safety review (PSR) based on a nuclear safety guideline, Periodic Safety Review for Operational Nuclear Power Plants (HAF0312), issued by National Nuclear Safety Administration of China (NNSA). Entrusted by the owner of Q1, Shanghai Nuclear Engineering Research and Design Institute (SNERDI) implemented reviews of three key safety factors including safety analysis, equipment qualification and ageing. PSR was a challenging work in China at that time and through three years' research and practice, SNERDI summarized a systematic achievement for the review including review methodology, scoping, review contents and implementation steps, etc.. During the process of review for the three safety factors, totally 148 review reports and 341 recommendations for corrections were submitted to Q1. These reports and recommendations have provided guidance for correction actions as follow-up of PSR. This paper focuses on technical aspects to carry out PSR for the above-mentioned three safety factors, including review scoping, contents, methodology and main steps. The review technology and relevant experience can be taken for reference for other NPPs to carry out PSR. (authors)

  7. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  8. Periodic safety reviews of nuclear power plants

    International Nuclear Information System (INIS)

    Toth, Csilla

    2009-01-01

    Operational nuclear power plants (NPPs) are generally subject to routine reviews of plant operation and special safety reviews following operational events. In addition, many Member States of the International Atomic Energy Agency (IAEA) have initiated systematic safety reassessment, termed periodic safety review (PSR), to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments, site specific, organizational and human aspects. These reviews include assessments of plant design and operation against current safety standards and practices. PSRs are considered an effective way of obtaining an overall view of actual plant safety, to determine reasonable and practical modifications that should be made in order to maintain a high level of safety throughout the plant's operating lifetime. PSRs can be used as a means to identify time limiting features of the plant. The trend is to use PSR as a condition for deciding whether to continue operation of the plant beyond the originally established design lifetime and for assessing the status of the plant for long term operation. To assist Member States in the implementation of PSR, the IAEA develops safety standards, technical documents and provides different services: training courses, workshops, technical meetings and safety review missions for the independent assessment of the PSR at NPPs, including the requirements for PSR, the review process and the PSR final reports. This paper describes the PSR's objectives, scopes, methods and the relationship of PSR with other plant safety related activities and recent experiences of Member States in implementation of PSRs at NPPs. (author)

  9. Lift truck safety review

    Energy Technology Data Exchange (ETDEWEB)

    Cadwallader, L.C.

    1997-03-01

    This report presents safety information about powered industrial trucks. The basic lift truck, the counterbalanced sit down rider truck, is the primary focus of the report. Lift truck engineering is briefly described, then a hazard analysis is performed on the lift truck. Case histories and accident statistics are also given. Rules and regulations about lift trucks, such as the US Occupational Safety an Health Administration laws and the Underwriter`s Laboratories standards, are discussed. Safety issues with lift trucks are reviewed, and lift truck safety and reliability are discussed. Some quantitative reliability values are given.

  10. Lift truck safety review

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1997-03-01

    This report presents safety information about powered industrial trucks. The basic lift truck, the counterbalanced sit down rider truck, is the primary focus of the report. Lift truck engineering is briefly described, then a hazard analysis is performed on the lift truck. Case histories and accident statistics are also given. Rules and regulations about lift trucks, such as the US Occupational Safety an Health Administration laws and the Underwriter's Laboratories standards, are discussed. Safety issues with lift trucks are reviewed, and lift truck safety and reliability are discussed. Some quantitative reliability values are given

  11. International Expert Team Concludes IAEA Peer Review of Poland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: International safety experts last week concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Poland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that Poland's nuclear regulator, Panstwowa Agencja Atomistyki (PAA), has a clear commitment to safety, a high level of transparency, competent staff and leadership, and a good recognition of challenges ahead related to Poland's efforts to develop nuclear power. ''Poland's regulatory framework and the work of PAA give high confidence of strong radiation protection for the Polish people. Further, there has been significant progress in the development of Poland's regulatory framework in preparation for the challenge of regulating nuclear power,'' said team leader Robert Lewis, a senior executive in the US Nuclear Regulatory Commission. The mission was conducted at the request of the Government of Poland from 15-25 April. The team was made up of 11 regulatory experts from Belgium, the Czech Republic, Finland, France, the Republic of Korea, Slovakia, Slovenia, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as five IAEA staff members. The IRRS review team was very thorough in its review, and we welcome its advice on how to continue to improve our programmes to protect people and the environment , said Janusz Wlodarski, President of PAA. The team interviewed members of PAA and officials from various ministries, as well as key players in the Polish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. Among its main observations the IRRS review team identified the following good practices: Applying the considerable experience of PAA's senior management to regulatory issues; The introduction of changes to Poland's laws and regulations following broad public consultation at an early stage in

  12. Development of a Preliminary Model for Evaluating Occupational Health and Safety Risk Management Maturity in Small and Medium-Sized Enterprises

    Directory of Open Access Journals (Sweden)

    Bilal Kaassis

    2018-02-01

    Full Text Available Management of occupational health and safety (OHS risks is a crucial component of any business. Numerous investigations have shown that work-related injuries and deaths occur disproportionately in small-to-medium-sized enterprises (SMEs and that this is clearly due to deficient management of OHS risks. The main goal of this work is to develop a base of indicators suitable for evaluating OHS risk management maturity in industrial SMEs. A preliminary model is then proposed for this evaluation, based on a small number of relevant indicators selected from a careful bibliographic review. The work begins with a critical review of the literature and analysis of known concepts, methods, tools and models of measurement of risk analysis maturity in order to extract relevant indicators. The most suitable indicators are then grouped to form the basis of a preliminary model for evaluating OHS risk management maturity in the SME setting. Our findings will help managers of SMEs make sound decisions in their quest to improve the OHS performance of their businesses.

  13. Periodic safety review of the experimental fast reactor JOYO. Review of the activity for safety

    International Nuclear Information System (INIS)

    Maeda, Yukimoto; Kashimura, Youichi; Suzuki, Toshiaki; Isozaki, Kazunori; Hoshiba, Hideaki; Kitamura, Ryoichi; Nakano, Tomoyuki; Takamatsu, Misao; Sekine, Takashi

    2005-02-01

    Periodic safety review (Review of the activity for safety) which consisted of 'Comprehensive evaluation of operation experience' and Incorporation of the latest technical knowledge' was carried out up to January 2005. 1. Comprehensive evaluation of operation experience. It was confirmed that the effectual activities for safety through the operation of JOYO were carried out in terms of (1) Operation management, (2) Maintenance management, (3) Fuel management, (4) Radiation management, (5) Radioactive waste management, (6) Emergency planning and (7) Feedback of incidents and failures. 2. Reflection of the latest technical knowledge. It was confirmed that the latest technical knowledge including regulation and guide line established by Nuclear Safety Commission of Japan until March 31st. 2003 were properly reflected in impressing the safety of the reactor. As a result, it was evaluated that the activity for safety was carried out effectually, and no additional measure was identified continual safe operation of the reactor. (author)

  14. 49 CFR 659.27 - Internal safety and security reviews.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Internal safety and security reviews. 659.27... State Oversight Agency § 659.27 Internal safety and security reviews. (a) The oversight agency shall... safety and security reviews in its system safety program plan. (b) The internal safety and security...

  15. Conclusion of the Preliminary Safety report for the LILW Repository on Trgovska Gora

    International Nuclear Information System (INIS)

    Lokner, V.; Levanat, I.; Schaller, A.; Kucar-Dragicevic, S.; Cerskov Klika, M.; Subasic, D.

    2002-01-01

    For more than a decade, APO d.o.o. has been engaged in preparations which might lead to establishment of a radioactive waste repository on Trgovska Gora, suitable for disposal of low and intermediate level waste (LILW) from the nuclear power plant Krsko. A recent product of theses activities is the preliminary safety assessment report (PSAR) for the proposed repository. In addition to an extensive overview of the repository project status, this preliminary SAR describes how the safety assessment methodology is used to demonstrate that a LILW facility will comply with radiological protection and safety requirements after the repository closure. LILW repository is designed to isolate waste from the environment for a couple hundred years in a reasonably efficient manner. It is generally not practicable to grant full waste containment throughout that period, because it suffices to demonstrate that radionuclide release and migration will remain below acceptable levels, which is achieved through safety assessment scenarios, modeling and calculations. However, with very limited repository specific data, safety assessment can only produce a conservative estimate of the upper bounds of potential exposures the repository could inflict. This PSAR arrives at such estimates in two different ways: (a) by simple bounding calculations and (b) through more sophisticated modeling and application of dedicated computer codes, but with similar conservative assumptions. Both approaches conservatively estimate that the highest potential dose to a nearby resident cannot significantly exceed the dose constraint of 0.2 mSv per year. Only in case of inadvertent intrusion into the near-surface disposal vault, much higher doses might be inflicted immediately after the planned institutional control of 250 years expires, but that can be prevented by a longer control period. Despite the preliminary and bounding style of the calculations, the PSAR has identified most important assumptions and

  16. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  17. Preliminary investigation of interconnected systems interactions for the safety injection system of Indian Point-3

    International Nuclear Information System (INIS)

    Alesso, H.P.; Lappa, D.A.; Smith, C.F.; Sacks, I.J.

    1983-01-01

    The rich diversity of ideas and techniques for analyzing interconnected systems interaction has presented the NRC with the problem of identifying methods appropriate for their own review and audit. This report presents the findings of a preliminary study using the Digraph Matrix Analysis method to evaluate interconnected systems interactions for the safety injection system of Indian Point-3. The analysis effort in this study was subjected to NRC constraints regarding the use of Boolean logic, the construction of simplified plant representations or maps, and the development of heuristic measures as specified by the NRC. The map and heuristic measures were found to be an unsuccessful approach. However, from the effort to model and analyze the Indian Point-3 safety injection system, including Boolean logic in the model, singleton and doubleton cut-sets were identified. It is recommended that efforts excluding Boolean logic and utilizing the NRC heuristic measures not be pursed further and that the Digraph Matrix approach (or other comparable risk assessment technique) with Boolean logic included to conduct the audit of the Indian Point-3 systems interaction study

  18. Conversion Preliminary Safety Analysis Report for the NIST Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Diamond, D. J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Baek, J. S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Hanson, A. L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Cheng, L-Y [Brookhaven National Lab. (BNL), Upton, NY (United States); Brown, N. [Brookhaven National Lab. (BNL), Upton, NY (United States); Cuadra, A. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-01-30

    The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the NIST research reactor (aka NBSR); a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a preliminary version of the Safety Analysis Report (SAR) that would be submitted to the U.S. Nuclear Regulatory Commission (NRC) for approval prior to conversion. The report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis in any conversion SAR is to explain the differences between the LEU and HEU cores and to show the acceptability of the new design; there is no need to repeat information regarding the current reactor that will not change upon conversion. Hence, as seen in the report, the bulk of the SAR is devoted to Chapter 4, Reactor Description, and Chapter 13, Safety Analysis.

  19. Development of Safety Review Guidance for Research and Training Reactors

    International Nuclear Information System (INIS)

    Oh, Kju-Myeng; Shin, Dae-Soo; Ahn, Sang-Kyu; Lee, Hoon-Joo

    2007-01-01

    The KINS already issued the safety review guidance for pressurized LWRs. But the safety review guidance for research and training reactors were not developed. So, the technical standard including safety review guidance for domestic research and training reactors has been applied mutates mutandis to those of nuclear power plants. It is often difficult for the staff to effectively perform the safety review of applications for the permit by the licensee, based on peculiar safety review guidance. The NRC and NSC provide the safety review guidance for test and research reactors and European countries refer to IAEA safety requirements and guides. The safety review guide (SRG) of research and training reactors was developed considering descriptions of the NUREG- 1537 Part 2, previous experiences of safety review and domestic regulations for related facilities. This study provided the safety review guidance for research and training reactors and surveyed the difference of major acceptance criteria or characteristics between the SRG of pressurized light water reactor and research and training reactors

  20. Preliminary Marine Safety Risk Assessment, Brandon Road Lock and Dam Invasive Species Control Measures

    Science.gov (United States)

    2016-12-01

    Decision makers must include control-measure monitoring and emergency “interventions” to insure safety. The Coast Guard operational commanders...system” incorporates a travelling car on a rail above the barge-loading wharf to prevent loading personnel, cargo surveyors, or others from falling...to the Gulf of Mexico . As “Loopers”, they will have already transited the CSSC electric barriers. Preliminary Marine Safety Risk Assessment, BRLD

  1. Development of safety review advisory system for nuclear power plants

    International Nuclear Information System (INIS)

    Kim, M. W.; Lee, H. C.; Park, S. O.; Park, W. J.; Lee, J. I.; Hur, K. Y.; Choi, S. S.; Lee, S. J.; Kang, C. M.

    2001-01-01

    For the development of an expert system supporting the safety review of nuclear power plants, the application program was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they were investigated by the safety review experts at KINS. Safety Review Advisory System (SRAS), the windows application on client-server environment was developed according to the above specifications. Reviewers can do their safety reviewing regardless of speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into three groups, administrator, project manager, and reviewer. Each user group has appropriate access capability. The function and some screen shots of SRAS are described in this paper

  2. Opinions on SKB's Safety Assessments SR 97 and SFL 3-5. A Review by SKI Consultants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The Swedish Nuclear Fuel and Waste Management Co. (SKB) has presented their safety assessment 'Deep repository for spent nuclear fuel, SR 97 - Post-closure safety'. SKB's report is part of the documentation that has been required by the Government before the start of site investigations. The Swedish Nuclear Power Inspectorate (SKI) is reviewing SR 97 according to earlier Government decisions. In its review work SKI has asked several consultants, that recently have been performing research work for SKI, to give their opinions on SR 97. SKI and the Swedish Radiation Protection Institute (SSI) have used these reports from the consultants as one complementary basis for the formulation of the SKI/SSI review report. This is a compilation of the reports from the different consultants, and therefore the different contributions vary in length, style and language. Included are also two consultant reports, giving comments on SKB's preliminary safety assessment for SFL 3-5 (deep repository for long-lived low- and intermediate-level waste). The 17 contributions have all been separately indexed.

  3. Conducting organizational safety reviews - requirements, methods and experience

    International Nuclear Information System (INIS)

    Reiman, T.; Oedewald, P.; Wahlstroem, B.; Rollenhagen, C.; Kahlbom, U.

    2008-03-01

    Organizational safety reviews are part of the safety management process of power plants. They are typically performed after major reorganizations, significant incidents or according to specified review programs. Organizational reviews can also be a part of a benchmarking between organizations that aims to improve work practices. Thus, they are important instruments in proactive safety management and safety culture. Most methods that have been used for organizational reviews are based more on practical considerations than a sound scientific theory of how various organizational or technical issues influence safety. Review practices and methods also vary considerably. The objective of this research is to promote understanding on approaches used in organizational safety reviews as well as to initiate discussion on criteria and methods of organizational assessment. The research identified a set of issues that need to be taken into account when planning and conducting organizational safety reviews. Examples of the issues are definition of appropriate criteria for evaluation, the expertise needed in the assessment and the organizational motivation for conducting the assessment. The study indicates that organizational safety assessments involve plenty of issues and situations where choices have to be made regarding what is considered valid information and a balance has to be struck between focus on various organizational phenomena. It is very important that these choices are based on a sound theoretical framework and that these choices can later be evaluated together with the assessment findings. The research concludes that at its best, the organizational safety reviews can be utilised as a source of information concerning the changing vulnerabilities and the actual safety performance of the organization. In order to do this, certain basic organizational phenomena and assessment issues have to be acknowledged and considered. The research concludes with recommendations on

  4. Conducting organizational safety reviews - requirements, methods and experience

    Energy Technology Data Exchange (ETDEWEB)

    Reiman, T.; Oedewald, P.; Wahlstroem, B. [Technical Research Centre of Finland, VTT (Finland); Rollenhagen, C. [Royal Institute of Technology, KTH, (Sweden); Kahlbom, U. [RiskPilot (Sweden)

    2008-03-15

    Organizational safety reviews are part of the safety management process of power plants. They are typically performed after major reorganizations, significant incidents or according to specified review programs. Organizational reviews can also be a part of a benchmarking between organizations that aims to improve work practices. Thus, they are important instruments in proactive safety management and safety culture. Most methods that have been used for organizational reviews are based more on practical considerations than a sound scientific theory of how various organizational or technical issues influence safety. Review practices and methods also vary considerably. The objective of this research is to promote understanding on approaches used in organizational safety reviews as well as to initiate discussion on criteria and methods of organizational assessment. The research identified a set of issues that need to be taken into account when planning and conducting organizational safety reviews. Examples of the issues are definition of appropriate criteria for evaluation, the expertise needed in the assessment and the organizational motivation for conducting the assessment. The study indicates that organizational safety assessments involve plenty of issues and situations where choices have to be made regarding what is considered valid information and a balance has to be struck between focus on various organizational phenomena. It is very important that these choices are based on a sound theoretical framework and that these choices can later be evaluated together with the assessment findings. The research concludes that at its best, the organizational safety reviews can be utilised as a source of information concerning the changing vulnerabilities and the actual safety performance of the organization. In order to do this, certain basic organizational phenomena and assessment issues have to be acknowledged and considered. The research concludes with recommendations on

  5. Nuclear Safety Review for 2015

    International Nuclear Information System (INIS)

    2015-06-01

    The Nuclear Safety Review 2015 focuses on the dominant nuclear safety trends, issues and challenges in 2014. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: improving radiation, transport and waste safety; strengthening safety in nuclear installations; enhancing emergency preparedness and response (EPR); and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards (CSS), and activities relevant to the Agency’s safety standards. The global nuclear community continued to make steady progress in improving nuclear safety throughout the world in 2014; and, the Agency and its Member States continued to implement the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”), which was endorsed by the General Conference in 2011 after the Fukushima Daiichi accident in March 2011. • Significant progress has been made in reviewing and revising various Agency’s safety standards in areas such as management of radioactive waste, design basis hazard levels, protection of nuclear power plants (NPPs) against severe accidents, design margins to avoid cliff edge effects, multiple facilities at one site, and strengthening the prevention of unacceptable radiological consequences to the public and the environment, communications and EPR. In addition, the Guidelines for Drafting IAEA Safety Standards and Nuclear Security Series Publications was issued in July 2014.• The Agency continued to analyse the relevant technical aspects of the Fukushima Daiichi accident and to share and disseminate lessons learned to the wider nuclear community. In 2014, the Agency organized two international experts’ meetings (IEMs), one on radiation protection and one on severe accident management. Reports from previous IEMs were also published in 2014: IAEA Report on Human and Organizational Factors in Nuclear

  6. Internal safety review team at Comanche Peak SES

    Energy Technology Data Exchange (ETDEWEB)

    Davis, D [Comanche Peak Steam Electric Staion, Texas Utilities, TX (United States)

    1997-09-01

    The presentations describes the following issues: levels of defense in depth; internal safety review organizations; methods used to perform safety assessment; safety committee review; quality verification; root cause analysis; human performance program; industry operating experience.

  7. Safety Review Services, Site Review Services and IRRS

    International Nuclear Information System (INIS)

    Yllera, Javier

    2010-01-01

    The selection and the evaluation of the site for a nuclear power plant are crucial parts of establishing a nuclear power programme and can be significantly affected by costs, public acceptance and safety considerations. Siting is the process of selecting a suitable site for a facility. This is area containing the plant, defined by a boundary and under effective control of the Plant Management. For safety related issues comparison within topics is generally quite straightforward. For example, sites with relatively higher seismic hazard would be penalized in comparison with those in more stable areas. The site for the NPP is generally chosen at a relatively ‘aseismic’ part of the country. This generally means that well known seismogenic sources are more than at least 50 kms from the site. The proposed sites for nuclear installations shall be examined with respect to the frequency and the severity of natural and human induced events and phenomena that could affect the safety of the installation. The Events unconnected with the operation of a facility or activity which could have an effect on the safety of the facility or activity. The relationship between the site and the design for the nuclear installation shall be examined to ensure that the radiological risk to the public and the environment arising from releases defined by the source terms is acceptably low. The Nuclear Regulatory Authority should issue a document that sets out the technical safety and security criteria against which the Site Permit Application for a new NPP will be reviewed. The objective of the Site Safety Review Services (SSRS) is provided upon request from a Member State. An independent review and assessment of the site and nuclear installation safety in relation to external natural and man induced hazards. This is to make recommendations on additional analysis or plant modifications to be carried out in order to comply with the IAEA Safety Standards and to enhance safety

  8. Most significant preliminary results of the probabilistic safety analysis on the Juragua nuclear power plant

    International Nuclear Information System (INIS)

    Perdomo, Manuel

    1995-01-01

    Since 1990 the Group for PSA Development and Applications (GDA/APS) is working on the Level-1 PSA for the Juragua-1 NPP, as a part of an IAEA Technical Assistance Project. The main objective of this study, which is still under way, is to assess, in a preliminary way, the Reactor design safety to find its potential 'weak points' at the construction stage, using a eneric data base. At the same time, the study allows the PSA team to familiarize with the plant design and analysis techniques for the future operational PSA of the plant. This paper presents the most significant preliminary results of the study, which reveal some advantages of the safety characteristics of the plant design in comparison with the homologous VVER-440 reactors and some areas, where including slight modifications would improve the plant safety, considering the level of detail at which the study is carried out. (author). 13 refs, 1 fig, 2 tabs

  9. Nuclear Safety Review for the Year 2012

    International Nuclear Information System (INIS)

    2012-07-01

    The Nuclear Safety Review for the Year 2012 contains an analytical overview of the dominant trends, issues and challenges worldwide in 2011 and the Agency's efforts to strengthen the global nuclear safety framework. This year's report also highlights issues and activities related to the accident at the Fukushima Daiichi nuclear power plant. The analytical overview is supported by the Appendix at the end of this document, entitled: The IAEA Safety Standards: Activities during 2011. A draft version of the Nuclear Safety Review for the Year 2012 was submitted to the March 2012 session of the Board of Governors in document GOV/2012/6. The final version of the Nuclear Safety Review for the Year 2012 was prepared in light of the discussions held during the Board of Governors and also of the comments received.

  10. Ares-I-X Vehicle Preliminary Range Safety Malfunction Turn Analysis

    Science.gov (United States)

    Beaty, James R.; Starr, Brett R.; Gowan, John W., Jr.

    2008-01-01

    Ares-I-X is the designation given to the flight test version of the Ares-I rocket (also known as the Crew Launch Vehicle - CLV) being developed by NASA. As part of the preliminary flight plan approval process for the test vehicle, a range safety malfunction turn analysis was performed to support the launch area risk assessment and vehicle destruct criteria development processes. Several vehicle failure scenarios were identified which could cause the vehicle trajectory to deviate from its normal flight path, and the effects of these failures were evaluated with an Ares-I-X 6 degrees-of-freedom (6-DOF) digital simulation, using the Program to Optimize Simulated Trajectories Version 2 (POST2) simulation framework. The Ares-I-X simulation analysis provides output files containing vehicle state information, which are used by other risk assessment and vehicle debris trajectory simulation tools to determine the risk to personnel and facilities in the vicinity of the launch area at Kennedy Space Center (KSC), and to develop the vehicle destruct criteria used by the flight test range safety officer. The simulation analysis approach used for this study is described, including descriptions of the failure modes which were considered and the underlying assumptions and ground rules of the study, and preliminary results are presented, determined by analysis of the trajectory deviation of the failure cases, compared with the expected vehicle trajectory.

  11. Preliminary safety evaluation (PSE) for Sodium Storage Facility at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Bowman, B.R.

    1994-01-01

    This evaluation was performed for the Sodium Storage Facility (SSF) which will be constructed at the Fast Flux Test Facility (FFTF) in the area adjacent to the South and West Dump Heat Exchanger (DHX) pits. The purpose of the facility is to allow unloading the sodium from the FFTF plant tanks and piping. The significant conclusion of this Preliminary Safety Evaluation (PSE) is that the only Safety Class 2 components are the four sodium storage tanks and their foundations. The building, because of its imminent risk to the tanks under an earthquake or high winds, will be Safety Class 3/2, which means the building has a Safety Class 3 function with the Safety Class 2 loads of seismic and wind factored into the design

  12. Safety impacts of bicycle infrastructure: A critical review.

    Science.gov (United States)

    DiGioia, Jonathan; Watkins, Kari Edison; Xu, Yanzhi; Rodgers, Michael; Guensler, Randall

    2017-06-01

    This paper takes a critical look at the present state of bicycle infrastructure treatment safety research, highlighting data needs. Safety literature relating to 22 bicycle treatments is examined, including findings, study methodologies, and data sources used in the studies. Some preliminary conclusions related to research efficacy are drawn from the available data and findings in the research. While the current body of bicycle safety literature points toward some defensible conclusions regarding the safety and effectiveness of certain bicycle treatments, such as bike lanes and removal of on-street parking, the vast majority treatments are still in need of rigorous research. Fundamental questions arise regarding appropriate exposure measures, crash measures, and crash data sources. This research will aid transportation departments with regard to decisions about bicycle infrastructure and guide future research efforts toward understanding safety impacts of bicycle infrastructure. Copyright © 2017 Elsevier Ltd and National Safety Council. All rights reserved.

  13. Nuclear safety review for 1984

    International Nuclear Information System (INIS)

    1985-08-01

    This publication is based on the fourth Nuclear Safety Review prepared by the IAEA Secretariat for presentation to the Board of Governors. It discusses relevant international activities in 1984 and the current status of nuclear safety and radiation protection, and looks ahead to anticipated developments

  14. Safety Review Committee - Annual Report 1991-1992

    International Nuclear Information System (INIS)

    1993-01-01

    During the year under review. The Safety Review Committee (SRC) assessed the safety of ANSTO's operations. This was done by site visits, examination of documentation and briefing by ANSTO officers responsible for particular operations, and includes HIFAR and Moata reactors, radioisotope production, packing and dispatch, radioactive waste management practices, occupational health and safety activities and ANSTO's arrangements for public health and safety beyond the site. This report describes the activities and findings of the SRC during the year ending 30 June 1992. 8 figs., ills

  15. IAEA Team Concludes Peer Review of Greece's Regulatory Framework for Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    ; and GEAC exhibits a strong commitment to education and training in radiation protection. The IRRS Review team identified issues warranting attention or in need of improvement, including: The Radiation Protection Regulations require updating to bring them in line with the current IAEA Safety Requirements. Consideration should be given to the adoption of a more flexible hierarchy of safety regulations; The nation's legal framework is dated, lacks the flexibility of a risk-based regulatory framework which provides for a graded approach to safety and has gaps particularly in respect of waste and decommissioning; A consolidated management system requires senior management commitment to allocate sufficient resources with the appropriate authority, and to actively involve all staff; and The prime responsibility for safety, the responsibilities of employers and workers with respect to occupational exposure, and responsibilities with respect to emergency preparedness and response need to be explicitly assigned in the legal and regulatory framework for safety. In a preliminary report, the IAEA has conveyed the team's main conclusions to GAEC, and a final report will be submitted to the commission in about three months. Background The IRRS team carried out a review of Greece's nuclear legal and regulatory framework for safety. The IRRS review addressed the facilities and activities regulated by GAEC which involve radiation sources in addition to the waste management facilities. The research reactor GRR-1 in the National Centre for Scientific Research ''Demokritos'' was out of the scope of this IRRS review but will be included in the follow-up mission. The mission took place from 20 to 30 May 2012 at the GAEC headquarters in Agia Paraskevi. A Press Conference was conducted at the end of the mission on 30 May. The IRRS team consisted of nine senior regulatory experts from nine IAEA Member States and five IAEA staff members. About IRRS Missions IRRS missions are designed to

  16. Internet Safety and Security Surveys - A Review

    DEFF Research Database (Denmark)

    Sharp, Robin

    This report gives a review of investigations into Internet safety and security over the last 10 years. The review covers a number of surveys of Internet usage, of Internet security in general, and of Internet users' awareness of issues related to safety and security. The focus and approach...... of the various surveys is considered, and is related to more general proposals for investigating the issues involved. A variety of proposals for how to improve levels of Internet safety and security are also described, and they are reviewed in the light of studies of motivational factors which affect the degree...

  17. Review of literature on the TMI accident and correlation to the LWR Safety Technology Program

    International Nuclear Information System (INIS)

    Miller, W.J.

    1980-05-01

    This report is the result of approximately two man-months of effort devoted to assimilating and comprehending significant publicly available material related to Three Mile Island Unit 2 and events during and subsequent to the accident experienced on March 28, 1979. Those events were then correlated with the Preliminary LWR Safety Technology Program Plan (Preliminary Program Plan) prepared for the US Department of Energy by Sandia National Lab. This report is being submitted simultaneously with the SAI report entitled Preliminary Prioritization of Tasks in the Draft LWR Safety Technology Program Plan

  18. Review of literature on the TMI accident and correlation to the LWR Safety Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Miller, W.J.

    1980-05-01

    This report is the result of approximately two man-months of effort devoted to assimilating and comprehending significant publicly available material related to Three Mile Island Unit 2 and events during and subsequent to the accident experienced on March 28, 1979. Those events were then correlated with the Preliminary LWR Safety Technology Program Plan (Preliminary Program Plan) prepared for the US Department of Energy by Sandia National Lab. This report is being submitted simultaneously with the SAI report entitled Preliminary Prioritization of Tasks in the Draft LWR Safety Technology Program Plan.

  19. Preliminary safety analysis report for the Waste Characterization Facility

    International Nuclear Information System (INIS)

    1994-10-01

    This safety analysis report outlines the safety concerns associated with the Waste Characterization Facility located in the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The three main objectives of the report are to: define and document a safety basis for the Waste Characterization Facility activities; demonstrate how the activities will be carried out to adequately protect the workers, public, and environment; and provide a basis for review and acceptance of the identified risk that the managers, operators, and owners will assume. 142 refs., 38 figs., 39 tabs

  20. Defining resilience: A preliminary integrative literature review

    Science.gov (United States)

    Wilt, Bonnie; Long, Suzanna K.; Shoberg, Thomas G.

    2016-01-01

    The term “resilience” is ubiquitous in technical literature; it appears in numerous forms, such as resilience, resiliency, or resilient, and each use may have a different definition depending on the interpretation of the writer. This creates difficulties in understanding what is meant by ‘resilience’ in any given use case, especially in discussions of interdisciplinary research. To better understand this problem, this research constructs a preliminary integrative literature review to map different definitions, applications and calculation methods of resilience invoked within critical infrastructure applications. The preliminary review uses a State-of-the-Art Matrix (SAM) analysis to characterize differences in definition across disciplines and between regions. Qualifying the various usages of resilience will produce a greater precision in the literature and a deeper insight into types of data required for its evaluation, particularly with respect to critical infrastructure calculations and how such data may be analyzed. Results from this SAM analysis will create a framework of key concepts as part of the most common applications for “resilient critical infrastructure” modeling.

  1. The Interagency Nuclear Safety Review Panel's Galileo safety evaluation report

    International Nuclear Information System (INIS)

    Nelson, R.C.; Gray, L.B.; Huff, D.A.

    1989-01-01

    The safety evaluation report (SER) for Galileo was prepared by the Interagency Nuclear Safety Review Panel (INSRP) coordinators in accordance with Presidential directive/National Security Council memorandum 25. The INSRP consists of three coordinators appointed by their respective agencies, the Department of Defense, the Department of Energy (DOE), and the National Aeronautics and Space Administration (NASA). These individuals are independent of the program being evaluated and depend on independent experts drawn from the national technical community to serve on the five INSRP subpanels. The Galileo SER is based on input provided by the NASA Galileo Program Office, review and assessment of the final safety analysis report prepared by the Office of Special Applications of the DOE under a memorandum of understanding between NASA and the DOE, as well as other related data and analyses. The SER was prepared for use by the agencies and the Office of Science and Technology Policy, Executive Office of the Present for use in their launch decision-making process. Although more than 20 nuclear-powered space missions have been previously reviewed via the INSRP process, the Galileo review constituted the first review of a nuclear power source associated with launch aboard the Space Transportation System

  2. Safety Review related to Commercial Grade Digital Equipment in Safety System

    International Nuclear Information System (INIS)

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  3. Nuclear Safety Review for 2014

    International Nuclear Information System (INIS)

    2014-07-01

    The Nuclear Safety Review 2014 focuses on the dominant nuclear safety trends, issues and challenges in 2013. The Executive Overview provides general nuclear safety information along with a summary of the major issues covered in this report: strengthening safety in nuclear installations; improving radiation, transport and waste safety; enhancing emergency preparedness and response (EPR); improving regulatory infrastructure and effectiveness; and strengthening civil liability for nuclear damage. The Appendix provides details on the activities of the Commission on Safety Standards, and activities relevant to the Agency’s safety standards. The global nuclear community has made steady and continuous progress in strengthening nuclear safety in 2013, as promoted by the IAEA Action Plan on Nuclear Safety (hereinafter referred to as “the Action Plan”) and reported in Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2013/8-GC(57)/INF/5), and the Supplementary Information to that report and Progress in the Implementation of the IAEA Action Plan on Nuclear Safety (document GOV/INF/2014/2). • Significant progress continues to be made in several key areas, such as assessments of safety vulnerabilities of nuclear power plants (NPPs), strengthening of the Agency’s peer review services, improvements in EPR capabilities, strengthening and maintaining capacity building, and protecting people and the environment from ionizing radiation. The progress that has been made in these and other areas has contributed to the enhancement of the global nuclear safety framework. • Significant progress has also been made in reviewing the Agency’s safety standards, which continue to be widely applied by regulators, operators and the nuclear industry in general, with increased attention and focus on vitally important areas such as design and operation of NPPs, protection of NPPs against severe accidents, and EPR. • The Agency continued to

  4. Safety of High Speed Magnetic Levitation Transportation Systems: Preliminary Safety Review of the Transrapid Maglev System

    Science.gov (United States)

    1990-11-01

    The safety of various magnetically levitated trains under development for possible : implementation in the United States is of direct concern to the Federal Railroad : Administration. This report, one in a series of planned reports on maglev safety, ...

  5. Periodic safety review of the experimental fast reactor JOYO. Review of aging management

    International Nuclear Information System (INIS)

    Isozaki, Kazunori; Ogawa, To-ru; Nishino, Kazunari

    2005-05-01

    Periodic safety review (Review of the aging management) which consisted of ''Technical review on aging for the safety related structures, systems and components'' and ''Establishment a long term maintenance program'' was carried out up to April 2005. 1. Technical review on aging for the safety related structures, systems and components. It was technically confirmed to prevent the loss of function of the safety related structures, systems and components due to aging phenomena, which (1) irradiation damage, (2) corrosion, (3) abrasion and erosion, (4) thermal aging, (5) creep and fatigue, (6) Stress Corrosion Cracking, (7) insulation deterioration and (8) general deterioration, under the periodic monitoring or renewal of them. 2. Establishment of long term maintenance program. The long term maintenance during JFY2005 to 2014 were established based on the technical review on aging for the safety related structures, systems and components. It was evaluated that the inspection and renewal based on the long term maintenance program, in addition to the spontaneous inspection of the long term voluntary long-term inspection plan, could prevent the loss of function of the safety related structures, systems and components. (author)

  6. Activity of safety review for the facilities using nuclear material (2). Safety review results and maintenance experiences for hot laboratories

    International Nuclear Information System (INIS)

    Amagai, Tomio; Fujishima, Tadatsune; Mizukoshi, Yasutaka; Sakamoto, Naoki; Ohmori, Tsuyoshi

    2009-01-01

    In the site of O-arai Research and Development Center of Japan Atomic Energy Agency (JAEA), five hot laboratories for post-irradiation examination and development of plutonium fuels are operated more than 30 years. A safety review method for preventive maintenance on these hot laboratories includes test facilities and devices are established in 2003. After that, the safety review of these facilities and devices are done and taken the necessary maintenance based on the results in each year. In 2008, 372 test facilities and devices in these hot laboratories were checked and reviewed by this method. As a results of the safety review, repair issues of 38 facilities of above 372 facilities were resolved. This report shows the review results and maintenance experiences based on the results. (author)

  7. Design review report for the hydrogen interlock preliminary design

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1996-01-01

    This report documents the completion of a preliminary design review for the hydrogen interlock. The hydrogen interlock, a proposed addition to the Rotary Mode Core Sampling (RMCS) system portable exhauster, is intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to validate basic design assumptions and concepts to support a path forward leading to a final design. The conclusion reached by the review committee was that the design was acceptable and efforts should continue toward a final design review

  8. Lessons learned from the Galileo and Ulysses flight safety review experience

    International Nuclear Information System (INIS)

    Bennett, Gary L.

    1998-01-01

    In preparation for the launches of the Galileo and Ulysses spacecraft, a very comprehensive aerospace nuclear safety program and flight safety review were conducted. A review of this work has highlighted a number of important lessons which should be considered in the safety analysis and review of future space nuclear systems. These lessons have been grouped into six general categories: (1) establishment of the purpose, objectives and scope of the safety process; (2) establishment of charters defining the roles of the various participants; (3) provision of adequate resources; (4) provision of timely peer-reviewed information to support the safety program; (5) establishment of general ground rules for the safety review; and (6) agreement on the kinds of information to be provided from the safety review process

  9. Safety evaluation review of the prototype license application safety analysis report

    International Nuclear Information System (INIS)

    1991-08-01

    The US Nuclear Regulatory Commission (NRC) staff and consultants reviewed a Prototype License Application Safety Analysis Report (PLASAR) submitted by the US Department of Energy (DOE) for the belowground vault (BGV) alternative method of low-level radioactive waste disposal. In Volume 1 of NUREG-1375, the NRC staff provided the safety review results for an earth-mounded concrete bunker PLASAR. In the current report, the staff focused its review on the design, construction, and operational aspects of the BGV PLASAR. The staff developed review comments and questions using the Standard Review Plan (SRP), Rev. 1 (NUREG-1200) as the basis for evaluating the acceptability of the information provided in the BGV PLASAR. The detailed review comments provided in this report are intended to be useful guidance to facility developers and State regulators in addressing issues likely to be encountered in the review of a license application for a low-level-waste disposal facility. 44 refs

  10. Preliminary Results of Ancillary Safety Analyses Supporting TREAT LEU Conversion Activities

    Energy Technology Data Exchange (ETDEWEB)

    Brunett, A. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Fei, T. [Argonne National Lab. (ANL), Argonne, IL (United States); Strons, P. S. [Argonne National Lab. (ANL), Argonne, IL (United States); Papadias, D. D. [Argonne National Lab. (ANL), Argonne, IL (United States); Hoffman, E. A. [Argonne National Lab. (ANL), Argonne, IL (United States); Kontogeorgakos, D. C. [Argonne National Lab. (ANL), Argonne, IL (United States); Connaway, H. M. [Argonne National Lab. (ANL), Argonne, IL (United States); Wright, A. E. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-10-01

    Report (FSAR) [3]. Depending on the availability of historical data derived from HEU TREAT operation, results calculated for the LEU core are compared to measurements obtained from HEU TREAT operation. While all analyses in this report are largely considered complete and have been reviewed for technical content, it is important to note that all topics will be revisited once the LEU design approaches its final stages of maturity. For most safety significant issues, it is expected that the analyses presented here will be bounding, but additional calculations will be performed as necessary to support safety analyses and safety documentation. It should also be noted that these analyses were completed as the LEU design evolved, and therefore utilized different LEU reference designs. Preliminary shielding, neutronic, and thermal hydraulic analyses have been completed and have generally demonstrated that the various LEU core designs will satisfy existing safety limits and standards also satisfied by the existing HEU core. These analyses include the assessment of the dose rate in the hodoscope room, near a loaded fuel transfer cask, above the fuel storage area, and near the HEPA filters. The potential change in the concentration of tramp uranium and change in neutron flux reaching instrumentation has also been assessed. Safety-significant thermal hydraulic items addressed in this report include thermally-induced mechanical distortion of the grid plate, and heating in the radial reflector.

  11. Periodic Safety Review of Nuclear Power Plants: Experience of Member States

    International Nuclear Information System (INIS)

    2010-04-01

    Routine reviews of nuclear power plant operation (including modifications to hardware and procedures, operating experience, plant management and personnel competence) and special reviews following major events of safety significance are the primary means of safety verification. In addition, many Member States of the IAEA have initiated systematic safety reassessments, termed periodic safety reviews, of nuclear power plants, to assess the cumulative effects of plant ageing and plant modifications, operating experience, technical developments and siting aspects. The reviews include an assessment of plant design and operation against current safety standards and practices, and they have the objective of ensuring a high level of safety throughout the plant's operating lifetime. They are complementary to the routine and special safety reviews and do not replace them. Periodic safety reviews of nuclear power plants are considered an effective way to obtain an overall view of actual plant safety, and to determine reasonable and practical modifications that should be made in order to maintain a high level of safety. They can be used as a means of identifying time limiting features of the plant in order to determine nuclear power plant operation beyond the designed lifetime. The periodic safety review process can be used to support the decision making process for long term operation or licence renewal. Since 1994, the use of periodic safety reviews by Member States has substantially broadened and confirmed its benefits. Periodic safety review results have, for example, been used by some Member States to help provide a basis for continued operation beyond the current licence term, to communicate more effectively with stakeholders regarding nuclear power plant safety, and to help identify changes to plant operation that enhance safety. This IAEA-TECDOC is intended to assist Member States in the implementation of a periodic safety review. This publication complements the

  12. A literature review of safety culture.

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Kerstan Suzanne; Stevens-Adams, Susan Marie; Wenner, Caren A.

    2013-03-01

    Workplace safety has been historically neglected by organizations in order to enhance profitability. Over the past 30 years, safety concerns and attention to safety have increased due to a series of disastrous events occurring across many different industries (e.g., Chernobyl, Upper Big-Branch Mine, Davis-Besse etc.). Many organizations have focused on promoting a healthy safety culture as a way to understand past incidents, and to prevent future disasters. There is an extensive academic literature devoted to safety culture, and the Department of Energy has also published a significant number of documents related to safety culture. The purpose of the current endeavor was to conduct a review of the safety culture literature in order to understand definitions, methodologies, models, and successful interventions for improving safety culture. After reviewing the literature, we observed four emerging themes. First, it was apparent that although safety culture is a valuable construct, it has some inherent weaknesses. For example, there is no common definition of safety culture and no standard way for assessing the construct. Second, it is apparent that researchers know how to measure particular components of safety culture, with specific focus on individual and organizational factors. Such existing methodologies can be leveraged for future assessments. Third, based on the published literature, the relationship between safety culture and performance is tenuous at best. There are few empirical studies that examine the relationship between safety culture and safety performance metrics. Further, most of these studies do not include a description of the implementation of interventions to improve safety culture, or do not measure the effect of these interventions on safety culture or performance. Fourth, safety culture is best viewed as a dynamic, multi-faceted overall system composed of individual, engineered and organizational models. By addressing all three components of

  13. 76 FR 78183 - Preliminary Plan for Retrospective Review Under E.O. 13579

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF JUSTICE Parole Commission 28 CFR Part 2 [Docket No. USPC-2011-01] Preliminary Plan for Retrospective Review Under E.O. 13579 AGENCY: United States Parole Commission, Justice. ACTION: Request for comments. SUMMARY: The U.S. Parole Commission is asking for comments on its preliminary plan...

  14. Periodic Safety Review in Interim Storage Facilities - Current Regulation and Experiences in Germany

    International Nuclear Information System (INIS)

    Neles, Julia Mareike; Schmidt, Gerhard

    2014-01-01

    Periodic safety reviews in nuclear power plants in Germany have been performed since the end of the 1980's as an indirect follow-up of the accident in Chernobyl and, in the meantime, are formally required by law. During this process the guidelines governing this review were developed in stages and reached their final form in 1996. Interim storage facilities and other nuclear facilities at that time were not included, so the guidelines were solely focused on the specific safety issues of nuclear power plants. Following IAEA's recommendations, the Western European Nuclear Regulator Association (WENRA) introduced PSRs in its safety reference levels for storage facilities (current version in WGWD report 2.1 as of Feb 2011: SRLs 59 - 61). Based on these formulations, Germany improved its regulation in 2010 with a recommendation of the Nuclear Waste Management Commission (Entsorgungskommission, ESK), an expert advisory commission for the federal regulatory body BMU. The ESK formulated these detailed requirements in the 'ESK recommendation for guides to the performance of periodic safety reviews for interim storage facilities for irradiated fuel elements and heat-generating radioactive waste'. Before finalization of the guideline a test phase was introduced, aimed to test the new regulation in practice and to later include the lessons learned in the final formulation of the guideline. The two-year test phase started in October 2011 in which the performance of a PSR will be tested at two selected interim storage facilities. Currently these recommendations are discussed with interested/concerned institutions. The results of the test phase shall be considered for improvements of the draft and during the final preparation of guidelines. Currently the PSR for the first ISF is in an advanced stage, the second facility just started the process. Preliminary conclusions from the test phase show that the implementation of the draft guideline requires interpretation. The aim of a

  15. Preliminary Safety Analysis Report for the Transuranic Storage Area Retrieval Enclosure at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-03-01

    This Transuranic Storage Area Retrieval Enclosure Preliminary Safety Analysis Report was completed as required by DOE Order 5480.23. The purpose of this document is to construct a safety basis that supports the design and permits construction of the facility. The facility has been designed to the requirements of a Radioactive Solid Waste Facility presented in DOE Order 6430.1A

  16. Preliminary Performance Analysis Program Development for Safety System with Safeguard Vessel

    International Nuclear Information System (INIS)

    Kang, Han-Ok; Lee, Jun; Park, Cheon-Tae; Yoon, Ju-Hyeon; Park, Keun-Bae

    2007-01-01

    SMART is an advanced modular integral type pressurized water reactor for a seawater desalination and an electricity production. Major components of the reactor coolant system such as the pressurizer, Reactor Coolant Pump (RCP), and steam generators are located inside the reactor vessel. The SMART can fundamentally eliminate the possibility of large break loss of coolant accidents (LBLOCAs), improve the natural circulation capability, and better accommodate and thus enhance a resistance to a wide range of transients and accidents. The safety goals of the SMART are enhanced through highly reliable safety systems such as the passive residual heat removal system (PRHRS) and the safeguard vessel coupled with the passive safety injection feature. The safeguard vessel is a steel-made, leak-tight pressure vessel housing the RPV, SIT, and the associated valves and pipelines. A primary function of the safeguard vessel is to confine any radioactive release from the primary circuit within the vessel under DBAs related to loss of the integrity of the primary system. A preliminary performance analysis program for a safety system using the safeguard vessel is developed in this study. The developed program is composed of several subroutines for the reactor coolant system, passive safety injection system, safeguard vessel including the pressure suppression pool, and PRHRS. A small break loss of coolant accident at the upper part of a reactor is analyzed and the results are discussed

  17. Gas cooled fast reactor 2400 MWTh, status on the conceptual design studies and preliminary safety analysis

    International Nuclear Information System (INIS)

    Malo, J.Y.; Alpy, N.; Bentivoglio, F.

    2009-01-01

    The Gas cooled Fast Reactor (GFR) is considered by the French Commissariat a l'Energie Atomique as a promising concept, combining the benefits of fast spectrum and high temperature, using Helium as coolant. A status on the GFR preliminary viability was made at the end of 2007, ending the pre-conceptual design phase. A consistent overall systems arrangement was proposed and a preliminary safety analysis based on operating transient calculations and a simplified PSA had established a global confidence in the feasibility and safety of this baseline concept. Its potential for attractive performances had been pointed out. Compare to the more mature Sodium Fast Reactor technology, no demonstrator has ever been built and the feasibility demonstration will required a longer lead time. The next main project milestone is related to the GFR viability, scheduled in 2012. The current studies consist in revisiting the reactor reference design options as selected at the end of 2007. Most of them are being consolidated by going more in depth in the analysis. Some possible alternatives are assessed. The paper will give a status on the last studies performed on the core design and corresponding neutronics and cycle performance, the Decay Heat Removal strategy and preliminary safety analysis, systems design and balance of plant... This paper is complementary to the Icapp'09 papers 9062 dealing with the Gas cooled Fast Reactor Demonstrator ALLEGRO and 9378 related to GFR transients analysis. (author)

  18. 49 CFR 659.29 - Oversight agency safety and security reviews.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Oversight agency safety and security reviews. 659... Role of the State Oversight Agency § 659.29 Oversight agency safety and security reviews. At least... safety program plan and system security plan. Alternatively, the on-site review may be conducted in an on...

  19. Posiva's application for a decision in principle concerning a disposal facility for spent nuclear fuel. STUK's statement and preliminary safety appraisal

    International Nuclear Information System (INIS)

    Ruokola, E.

    2000-03-01

    In May 1999, Posiva Ltd submitted to the Government an application, pursuant to the Nuclear Energy Act, for a Decision in Principle on a disposal facility for spent nuclear fuel from the Finnish nuclear power plants. The Ministry of Trade and Industry requested the Radiation and Nuclear Safety Authority (STUK) to draw up a preliminary safety appraisal concerning the proposed disposal facility. In the beginning of this report, STUK's statement to the Ministry and Industry concerning the proposed disposal facility is given. In that statement, STUK concludes that the Decision in Principle is currently justified from the standpoint of safety. The statement is followed by a safety appraisal, where STUK deems, how the proposed disposal concept, site and facility comply with the safety requirements included in the Government's Decision (478/1999). STUK's preliminary safety appraisal was supported by contributions from a number of outside experts. A collective opinion by an international group of ten distinguished experts is appended to this report. (orig.)

  20. Preliminary safety assessment study for the conceptual design of a repository in tuff at Yucca Mountain

    International Nuclear Information System (INIS)

    Jackson, J.L.; Gram, H.F.; Hong, K.J.; Ng, H.S.; Pendergrass, A.M.

    1984-12-01

    Preliminary estimates of the upper bounds on postulated worst-case radiological releases resulting from possible accidents during the operating period of a prospective repository in tuff at Yucca Mountain are presented. Possible disrupting events are screened to identify the accidents of greatest potential consequence. The radiological dose commitments for the general public and repository personnel are estimated for postulated releases caused by natural phenomena, man-made events, and operational accidents. All postulated worst-case releases result in doses to the public that are lower than the 0.5-rem, whole-body dose-per-accident limit set by the Nuclear Regulatory Commission (NRC) in 10 CFR 60. Doses to repository personnel are within the NRC's 5.0-rem/yr occupational exposure limit set in 10 CFR 20 for normal operations. Doses are within this limit for all accidents except the transportation accident and fire in a drift. A preliminary risk assessment has also been performed. Based on this preliminary safety study, the proposed site boundaries and design criteria routinely used in constructing nuclear facilities appear to be adequate to protect the safety of the general public during the operating phase of the repository

  1. Development of safety analysis technology for LMR

    International Nuclear Information System (INIS)

    Hahn, Do Hee; Kwon, Y. M.; Kim, K. D.

    2000-05-01

    The analysis methodologies as well as the analysis computer code system for the transient, HCDA, and containment performance analyses, which are required for KALIMER safety analyses, have been developed. The SSC-K code has been developed based on SSC-L which is an analysis code for loop type LMR, by improving models necessary for the KALIMER system analysis, and additional models have been added to the code. In addition, HCDA analysis model has been developed and the containment performance analysis code has been also improved. The preliminary basis for the safety analysis has been established, and the preliminary safety analyses for the key design features have been performed. In addition, a state-of-art analysis for LMR PSA and overseas safety and licensing requirements have been reviewed. The design database for the systematic management of the design documents as well as design processes has been established as well

  2. Development of safety analysis technology for LMR

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Do Hee; Kwon, Y. M.; Kim, K. D. [and others

    2000-05-01

    The analysis methodologies as well as the analysis computer code system for the transient, HCDA, and containment performance analyses, which are required for KALIMER safety analyses, have been developed. The SSC-K code has been developed based on SSC-L which is an analysis code for loop type LMR, by improving models necessary for the KALIMER system analysis, and additional models have been added to the code. In addition, HCDA analysis model has been developed and the containment performance analysis code has been also improved. The preliminary basis for the safety analysis has been established, and the preliminary safety analyses for the key design features have been performed. In addition, a state-of-art analysis for LMR PSA and overseas safety and licensing requirements have been reviewed. The design database for the systematic management of the design documents as well as design processes has been established as well.

  3. Nuclear safety review for the year 1997

    International Nuclear Information System (INIS)

    1998-12-01

    The Nuclear Safety Review attempts to summarize the global nuclear safety scene during 1997. It starts with discussion of significant safety related events worldwide: International cooperation; reactor facilities; radioactive waste management; medical uses of radiation sources; events at other facilities and transport of radioactive material. This is followed by a description of principal IAEA activities that contributed to global nuclear safety, namely: legally binding international agreements; non-binding safety standards and their application. The third part highlights developments in Member States as they reported them. The review closes with a description of issues that are likely to be prominent in the coming year(s). A draft version was submitted to the March 1998 session of the IAEA Board of Governors, and this final version has been prepared in light of the discussion in the Board and was submitted for information to the 42nd session of the IAEA General Conference

  4. SKI's and SSI's review of SKB's safety report SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Dverstorp, Bjoern; Stroemberg, Bo (and others)

    2008-03-15

    This report summarises SKI's and SSI's joint review of the Swedish Nuclear Fuel and Waste Management Co's (SKB) safety report SR-Can (SKB TR-06-09). SR-Can is the first assessment of post-closure safety for a KBS-3 spent nuclear fuel repository at the candidate sites Forsmark and Laxemar, respectively. The analysis builds on data from the initial stage of SKB's surface-based site investigations and on data from full-scale manufacturing and testing of buffer and copper canisters. SR-Can can be regarded as a preliminary version of the safety report that will be required in connection with SKB's planned licence application for a final repository in late 2009. The main purpose of the authorities' review is to provide feedback to SKB on their safety reporting as part of the pre-licensing consultation process. However, SR-Can is not part of the formal licensing process. In support of the authorities' review three international peer review teams were set up to make independent reviews of SR-Can from three perspectives, namely integration of site data, representation of the engineered barriers and safety assessment methodology, respectively. Further, several external experts and consultants have been engaged to review detailed technical and scientific issues in SR-Can. The municipalities of Oesthammar and Oskarshamn where SKB is conducting site investigations, as well NGOs involved in SKB's programme, have been invited to provide their views on SR-Can as input to the authorities' review. Finally, the authorities themselves, and with the help of consultants, have used independent models to reproduce part of SKB's calculations and to make complementary calculations. All supporting review documents are published in SKI's and SSI's report series. The main findings of the review are: -SKB's safety assessment methodology is overall in accordance with applicable regulations, but part of the methodology needs to be

  5. Operational safety review programmes for nuclear power plants. Guidelines for assessment

    International Nuclear Information System (INIS)

    2002-01-01

    The IAEA has been offering the Operational Safety Review Team (OSART) programme to provide advice and assistance to Member States in enhancing the operational safety of nuclear power plants (NPPs). Simultaneously, the IAEA has encouraged self-assessment and review by Member States of their own nuclear power plants to continuously improve nuclear safety. Currently, some utilities have been implementing safety review programmes to independently review their own plants. Corporate or national operational safety review programmes may be compliance or performance based. Successful utilities have found that both techniques are necessary to provide assurance that (i) as a minimum the NPP meets specific corporate and legal requirements and (ii) management at the NPP is encouraged to pursue continuous improvement principles. These programmes can bring nuclear safety benefits to the plants and utilities. The IAEA has conducted two pilot missions to assess the effectiveness of the operational review programme. Based on these missions and on the experience gained during OSART missions, this document has been developed to provide guidance on and broaden national/corporate safety review programmes in Member States, and to assist in maximizing their benefits. These guidelines are intended primarily for the IAEA team to conduct assessment of a national/corporate safety review programme. However, this report may also be used by a country or utility to establish its own national/corporate safety review programme. The guidelines may likewise be used for self-assessment or for establishing a baseline when benchmarking other safety review programmes. This report consists of four parts. Section 2 addresses the planning and preparation of an IAEA assessment mission and Sections 3 and 4 deal with specific guidelines for conducting the assessment mission itself

  6. Safety reviews of next-generation light-water reactors

    International Nuclear Information System (INIS)

    Kudrick, J.A.; Wilson, J.N.

    1997-01-01

    The Nuclear Regulatory Commission (NRC) is reviewing three applications for design certification under its new licensing process. The U.S. Advanced Boiling Water Reactor (ABWR) and System 80+ designs have received final design approvals. The AP600 design review is continuing. The goals of design certification are to achieve early resolution of safety issues and to provide a more stable and predictable licensing process. NRC also reviewed the Utility Requirements Document (URD) of the Electric Power Research Institute (EPRI) and determined that its guidance does not conflict with NRC requirements. This review led to the identification and resolution of many generic safety issues. The NRC determined that next-generation reactor designs should achieve a higher level of safety for selected technical and severe accident issues. Accordingly, NRC developed new review standards for these designs based on (1) operating experience, including the accident at Three Mile Island, Unit 2; (2) the results of probabilistic risk assessments of current and next-generation reactor designs; (3) early efforts on severe accident rulemaking; and (4) research conducted to address previously identified generic safety issues. The additional standards were used during the individual design reviews and the resolutions are documented in the design certification rules. 12 refs

  7. On some aspects of nuclear safety surveillance and review

    International Nuclear Information System (INIS)

    Li Ganjie; Zhu Hong; Zhou Shanyuan

    2004-01-01

    Five aspects of the nuclear safety surveillance and review are discussed: Strict implementation of nuclear safety regulation, making the nuclear safety surveillance and review more normalization, procedurization, scientific decision-making; Strictly requiring the applicant to comply with the requirements of codes, do not allowing the utilization of mixing of codes; Properly controlling the strictness for the review on significant non-conformance; Strengthening the co-operation between regional offices and technical support units, Properly treat the relations between administrational management unit and technical support units. (authors)

  8. A review of models relevant to road safety.

    Science.gov (United States)

    Hughes, B P; Newstead, S; Anund, A; Shu, C C; Falkmer, T

    2015-01-01

    It is estimated that more than 1.2 million people die worldwide as a result of road traffic crashes and some 50 million are injured per annum. At present some Western countries' road safety strategies and countermeasures claim to have developed into 'Safe Systems' models to address the effects of road related crashes. Well-constructed models encourage effective strategies to improve road safety. This review aimed to identify and summarise concise descriptions, or 'models' of safety. The review covers information from a wide variety of fields and contexts including transport, occupational safety, food industry, education, construction and health. The information from 2620 candidate references were selected and summarised in 121 examples of different types of model and contents. The language of safety models and systems was found to be inconsistent. Each model provided additional information regarding style, purpose, complexity and diversity. In total, seven types of models were identified. The categorisation of models was done on a high level with a variation of details in each group and without a complete, simple and rational description. The models identified in this review are likely to be adaptable to road safety and some of them have previously been used. None of systems theory, safety management systems, the risk management approach, or safety culture was commonly or thoroughly applied to road safety. It is concluded that these approaches have the potential to reduce road trauma. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Immunogenicity and Safety of the New Inactivated Quadrivalent Influenza Vaccine Vaxigrip Tetra: Preliminary Results in Children ≥6 Months and Older Adults

    Directory of Open Access Journals (Sweden)

    Emanuele Montomoli

    2018-03-01

    Full Text Available Since the mid-1980s, two lineages of influenza B viruses have been distinguished. These can co-circulate, limiting the protection provided by inactivated trivalent influenza vaccines (TIVs. This has prompted efforts to formulate quadrivalent influenza vaccines (QIVs, to enhance protection against circulating influenza B viruses. This review describes the results obtained from seven phase III clinical trials evaluating the immunogenicity, safety, and lot-to-lot consistency of a new quadrivalent split-virion influenza vaccine (Vaxigrip Tetra® formulated by adding a second B strain to the already licensed TIV. Since Vaxigrip Tetra was developed by means of a manufacturing process strictly related to that used for TIV, the data on the safety profile of TIV are considered supportive of that of Vaxigrip Tetra. The safety and immunogenicity of Vaxigrip Tetra were similar to those of the corresponding licensed TIV. Moreover, the new vaccine elicits a superior immune response towards the additional strain, without affecting immunogenicity towards the other three strains. Vaxigrip Tetra is well tolerated, has aroused no safety concerns, and is recommended for the active immunization of individuals aged ≥6 months. In addition, preliminary data confirm its immunogenicity and safety even in children aged 6–35 months and its immunogenicity in older subjects (aged 66–80 years.

  10. IRSN safety research carried out for reviewing geological disposal safety case

    International Nuclear Information System (INIS)

    Serres, Christophe; Besnus, Francois; Gay, Didier

    2010-01-01

    The Radiation Protection and Nuclear Safety Institute develops a research programme on scientific issues related to geological disposal safety in order to supporting the technical assessment carried out in the framework of the regulatory review process. This research programme is organised along key safety questions that deal with various scientific disciplines as geology, hydrogeology, mechanics, geochemistry or physics and is implemented in national and international partnerships. It aims at providing IRSN with sufficient independent knowledge and scientific skills in order to be able to assess whether the scientific results gained by the waste management organisation and their integration for demonstrating the safety of the geological disposal are acceptable with regard to the safety issues to be dealt with in the Safety Case. (author)

  11. Mapping the nomological network of employee self-determined safety motivation: A preliminary measure in China.

    Science.gov (United States)

    Jiang, Li; Tetrick, Lois E

    2016-09-01

    The present study introduced a preliminary measure of employee safety motivation based on the definition of self-determination theory from Fleming (2012) research and validated the structure of self-determined safety motivation (SDSM) by surveying 375 employees in a Chinese high-risk organization. First, confirmatory factor analysis (CFA) was used to examine the factor structure of SDSM, and indices of five-factor model CFA met the requirements. Second, a nomological network was examined to provide evidence of the construct validity of SDSM. Beyond construct validity, the analysis also produced some interesting results concerning the relationship between leadership antecedents and safety motivation, and between safety motivation and safety behavior. Autonomous motivation was positively related to transformational leadership, negatively related to abusive supervision, and positively related to safety behavior. Controlled motivation with the exception of introjected regulation was negatively related to transformational leadership, positively related to abusive supervision, and negatively related to safety behavior. The unique role of introjected regulation and future research based on self-determination theory were discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Domestic Regulation for Periodic Safety Review of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kim, Daesik; Ahn, Seunghoon; Auh, Geunsun; Lee, Jonghyeok

    2015-01-01

    The so-called Periodic Safety Review (PSR) has been carried out such safety assessment throughout its life, on a periodic basis. In January 2001, the Atomic Energy Act and related regulations were amended to adopt the PSR institutional scheme from IAEA Nuclear Safety Guide 50-SG-O12. At that time the safety assessment was made to review the plant safety on 10 safety factors, such as aging management and emergency planning, where the safety factor indicates the important aspects of safety of an operating NPP to be addressed in the PSR. According to this legislation, the domestic utility, the KHNP has conducted the PSR for the operating NPP of 10 years coming up from operating license date, starting since May 2000. Some revisions in the PSR rule were made to include the additional safety factors last year. This paper introduces the current status of the PSR review and regulation, in particular new safety factors and updated technical regulation. Comprehensive safety assessment for Korea Nuclear Power Plants have performed a reflecting design and procedure changes and considering the latest technology every 10 years. This paper also examined the PSR system changes in Korea. As of July 2015, reviews for PSR of 18 units have been completed, with 229 nuclear safety improvement items. And implementation have been completed for 165 of them. PSR system has been confirmed that it has contributed to improvement of plant safety. In addition, this paper examined the PSR system change in Korea

  13. White paper: Preliminary assessment of LNG vehicle technology, economics, and safety issues (Revision 1). Topical report, April-August 1991

    International Nuclear Information System (INIS)

    Powars, C.; Lucher, D.; Moyer, C.; Browning, L.

    1992-01-01

    The objective of the study is to evaluate the potential of LNG as a vehicle fuel, to determine market niches, and to identify needed technology improvements. The white paper is being issued when the work is approximately 30 percent complete to preview the study direction, draw preliminary conclusions, and make initial recommendations. Interim findings relative to LNG vehicle technology, economics, and safety are presented. It is important to decide if heavier hydrocarbons should be allowed in LNG vehicle fuel. Development of suitable refueling couplings and vehicle fuel supply pressure systems are recommended. Initial economics analyses considered transit buses and pickup and delivery trucks fueled via onsite liquefiers and imported LNG. Net user costs were more than (but in some cases close to) those for diesel fuel and gasoline. Lowering the cost of small-scale liquefiers would significantly improve the economics of LNG vehicles. New emissions regulations may introduce considerations beyond simple cost comparisons. LNG vehicle safety and available accident data are reviewed. Consistent codes for LNG vehicles and refueling facilities are needed

  14. Nuclear safety review for the year 2001

    International Nuclear Information System (INIS)

    2002-07-01

    The Nuclear Safety Review for the Year 2001 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts. Part 1 describes those events in 2001 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety. Part 2 describes some of the IAEA's efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2001. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2001. Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2001 was presented to the March 2002 session of IAEA's Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2002 that were considered pertinent to the discussion of events during 2001

  15. Interagency Nuclear Safety Review Panel Power System Subpanel review for the Ulysses mission

    International Nuclear Information System (INIS)

    McCulloch, W.H.

    1991-01-01

    As part of the Interagency Nuclear Safety Review Panel's assessment of the nuclear safety of NASA's Ulysses Mission to investigate properties of the sun, the Power System Subpanel has reviewed the safety analyses and risk evaluations done for the General Purpose Heat Source-Radioisotope Thermoelectric Generator which provides on-board electrical power for the spacecraft. This paper summarizes the activities and results of that review. In general, the approach taken in the primary analysis, executed by the General Electric Company under contract to the Department of Energy, and the resulting conclusions were confirmed by the review. However, the Subpanel took some exceptions and modified the calculations accordingly, producing an independent evaluation of potential releases of radioactive fuel in launch and reentry accidents. Some of the more important of these exceptions are described briefly

  16. Guidelines for the review research reactor safety. Reference document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    International Nuclear Information System (INIS)

    1997-01-01

    In 1992, the IAEA published new safety standards for research reactors as part of the set of publications considered by its Research Reactor Safety Programme (RRSP). This set also includes publications giving guidance for all safety aspects related to the lifetime of a research reactor. In addition, the IAEA has also revised the Safety Standards for radiation protection. Consequently, it was considered advisable to revise the Integrated Safety Assessment of Research Reactors (INSARR) procedures to incorporate the new requirements and guidance as well as to extend the scope of the safety reviews to currently operating research reactors. The present report is the result of this revision. The purpose of this report is to give guidance on the preparation, execution, reporting and follow-up of safety review mission to research reactors as conducted by the IAEA under its INSARR missions safety service. However, it will also be of assistance to operators and regulators in conducting: (a) ad hoc safety assessments of research reactors to address individual issues such as ageing or safety culture; and (b) other types of safety reviews such as internal and peer reviews and regulatory inspections

  17. Aging evaluation methodology of periodic safety review in Korea

    International Nuclear Information System (INIS)

    Park, Heung-Bae; Jung, Sung-Gyu; Jin, Tae-Eun; Jeong, Ill-Seok

    2002-01-01

    In Korea plant lifetime management (PLIM) study for Kori Unit 1 has been performed since 1993. Meanwhile, periodic safety review (PSR) for all operating nuclear power plants (NPPs) has been started with Kori Unit 1 since 2000 per IAEA recommendation. The evaluation period is 10 years, and safety (evaluation) factors are 11 per IAEA guidelines as represented in table 1. The relationship between PSR factors and PLIM is also represented. Among these factors evaluation of 'management of aging' is one of the most important and difficult factor. This factor is related to 'actual condition of the NPP', 'use of experience from other nuclear NPPs and of research findings', and 'management of aging'. The object of 'management of aging' is to obtain plant safety through identifying actual condition of system, structure and components (SSCs) and evaluating aging phenomena and residual life of SSCs using operating experience and research findings. The paper describes the scope and procedure of valuation of 'management of aging', such as, screening criteria of SSCs, Code and Standards, evaluation of SSCs and safety issues as represented. Evaluating SSCs are determined using final safety analysis report (FSAR) and power unit maintenance system for Nuclear Ver. III (PUMAS/N-III). The screening criteria of SSCs are safety-related items (quality class Q), safety-impact items (quality class T), backfitting rule items (fire protection (10CFR50.48), environmental qualification (10CFR50.49), pressurized thermal shock (10CFR50.61), anticipated transient without scram (10CFR50.62), and station blackout (10CFR50.63)) and regulating authority requiring items[1∼3]. The purpose of review of Code and Standards is identifying actual condition of the NPP and evaluating aging management using effective Code and Standards corresponding to reactor facilities. Code and Standards is composed of regulating laws, FSAR items, administrative actions, regulating actions, agreement items, and other

  18. Safety barriers and safety functions a comparison of different applications

    International Nuclear Information System (INIS)

    Harms-Ringdahl, L.

    1998-01-01

    A study is being made with the focus on different theories and applications concerning 'safety barriers' and 'safety functions'. One aim is to compare the characteristics of different kinds of safely functions, which can be purpose, efficiency, reliability, weak points etc. A further aim is to summarize how the combination of different barriers are described and evaluated. Of special interest are applications from nuclear and chemical process safety. The study is based on a literature review, interviews and discussions. Some preliminary conclusions are made. For example, it appears to exist a need for better tools to support the design and evaluation of procedures. There are a great number of theoretical models describing safety functions. However, it still appears to be an interest in further development of models, which might give the basis for improved practical tools. (author)

  19. Guidelines for the Review of Research Reactor Safety: Revised Edition. Reference Document for IAEA Integrated Safety Assessment of Research Reactors (INSARR)

    International Nuclear Information System (INIS)

    2013-01-01

    The Integrated Safety Assessment of Research Reactors (INSARR) is an IAEA safety review service available to Member States with the objective of supporting them in ensuring and enhancing the safety of their research reactors. This service consists of performing a comprehensive peer review and an assessment of the safety of the respective research reactor. The reviews are based on IAEA safety standards and on the provisions of the Code of Conduct on the Safety of Research Reactors. The INSARR can benefit both the operating organizations and the regulatory bodies of the requesting Member States, and can include new research reactors under design or operating research reactors, including those which are under a Project and Supply Agreement with the IAEA. The first IAEA safety evaluation of a research reactor operated by a Member State was completed in October 1959 and involved the Swiss 20 MW DIORIT research reactor. Since then, and in accordance with its programme on research reactor safety, the IAEA has conducted safety review missions in its Member States to enhance the safety of their research reactor facilities through the application of the Code of Conduct on the Safety of Research Reactors and the relevant IAEA safety standards. About 320 missions in 51 Member States were undertaken between 1972 and 2012. The INSARR missions and other limited scope safety review missions are conducted following the guidelines presented in this publication, which is a revision of Guidelines for the Review of Research Reactor Safety (IAEA Services Series No. 1), published in December 1997. This publication details those IAEA safety standards and guidance publications relevant to the safety of research reactors that have been revised or published since 1997. The purpose of this publication is to give guidance on the preparation, implementation, reporting and follow-up of safety review missions. It is also intended to be of assistance to operators and regulators in conducting

  20. International Expert Team Concludes IAEA Peer Review of Finland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: International safety experts today concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Finland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that the Radiation and Nuclear Safety Authority of Finland (STUK) is a competent and highly credible regulator that is open and transparent and derives great strength from the technical competence of its staff. ''Finland's comprehensive regulatory framework allows STUK to operate in practice as an independent regulatory body,'' said team leader Philippe Jamet, a commissioner of the French regulatory body ASN. The mission was conducted at the request of the Government of Finland from 15-26 October. The team interviewed members of STUK and officials from various ministries, as well as key players in the Finnish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. The team was made up of 18 members from Bulgaria, Canada, the Czech Republic, France, Germany, Iceland, Ireland, Romania, the Russian Federation, South Africa, Slovakia, Slovenia, Spain, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as six IAEA staff members. 'The IRRS mission and preparation for it was a unique occasion that involved the whole organization, provided motivation for improvement of the safety framework in Finland and assists STUK review its mission', said Tero Varjoranta, Director General of STUK. The IRRS team identified a number of good practices and achievements, including: - STUK's excellence in its safety assessment of nuclear power plants and waste repositories, in particular its demonstration that long-term political commitment is a necessity to sustain the creation of a waste repository as well as its regulatory oversight of medical applications of radiation sources; and - STUK's excellent record in

  1. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  2. Review of Public Safety in Viewpoint of Complex Networks

    International Nuclear Information System (INIS)

    Gai Chengcheng; Weng Wenguo; Yuan Hongyong

    2010-01-01

    In this paper, a brief review of public safety in viewpoint of complex networks is presented. Public safety incidents are divided into four categories: natural disasters, industry accidents, public health and social security, in which the complex network approaches and theories are need. We review how the complex network methods was developed and used in the studies of the three kinds of public safety incidents. The typical public safety incidents studied by the complex network methods in this paper are introduced, including the natural disaster chains, blackouts on electric power grids and epidemic spreading. Finally, we look ahead to the application prospects of the complex network theory on public safety.

  3. Preliminary safety analysis of molten salt breeder reactor

    International Nuclear Information System (INIS)

    Cheng Maosong; Dai Zhimin

    2013-01-01

    Background: The molten salt reactor is one of the six advanced reactor concepts identified by the Generation IV International Forum as a candidate for cooperative development, which is characterized by remarkable advantages in inherent safety, fuel cycle, miniaturization, effective utilization of nuclear resources and proliferation resistance. ORNL finished the conceptual design of Molten Salt Breeder Reactor (MSBR) based on the design, building and operation of Molten Salt Reactor Experiment (MSRE). Purpose: We attempt to implement the preliminary safety analysis of MSBR in order to provide a reference for the design and optimization of MSBR in the future. Methods: According to the conceptual design of MSBR, a model of safety analysis using point kinetics coupled with the simplified heat transfer mechanism is presented. The model is applied to simulate the transient phenomena of MSBR initiated by an abnormal step reactivity addition and an abnormal ramp reactivity addition at full-power equilibrium condition. Results: The thermal power in the core increases rapidly at the beginning and is accompanied by a rise of the fuel and graphite temperatures after 100, 300, 500 and 600 pcm reactivity addition. The maximum outlet temperature of the fuel in the core is at 1250℃ in 500 pcm reactivity addition, but up to 1350℃ in 600 pcm reactivity addition. The maximum of the power and the temperature are delayed and lower in the ramp reactivity addition rather than in the step reactivity addition. Conclusions: Based on the results, when the reactivity inserted is less than 500 pcm in maximum at full power equilibrium condition, the structural material in Hastelloy-N is not melted and can keep integrity without external control action. And it is necessary to try to avoid inserting a reactivity at short time. (authors)

  4. The necessity of periodic fire safety review

    International Nuclear Information System (INIS)

    Mowrer, D.S.

    1998-01-01

    Effective fire safety requires the coordinated integration of many diverse elements. Clear fire safety objectives are defined by plant management and/or regulatory authorities. Extensive and time-consuming systematic analyses are performed. Fire safety features (both active and passive) are installed and maintained, and administrative programs are established and implemented to achieve the defined objectives. Personnel are rigorously trained. Given the time, effort and monetary resources expended to achieve a specific level of fire safety, conducting periodic assessments to verify that the specified level of fire safety has been achieved and is maintained is a matter of common sense. Periodic fire safety reviews and assessment play an essential role in assuring continual nuclear safety in the world's power plants

  5. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  6. Nuclear safety review for the year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The nuclear safety review for the year 2000 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts: Part 1 describes those events in 2000 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety; Part 2 describes some of the IAEA efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2000. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2000; Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2000 was presented to the March 2001 session of the IAEA Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2001 that were considered pertinent to the discussion of events during 2000. In such cases, a note containing the more recent information has been provided in the form of a footnote

  7. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  8. Occupational Safety Review of High Technology Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee Cadwallader

    2005-01-31

    This report contains reviews of operating experiences, selected accident events, and industrial safety performance indicators that document the performance of the major US DOE magnetic fusion experiments and particle accelerators. These data are useful to form a basis for the occupational safety level at matured research facilities with known sets of safety rules and regulations. Some of the issues discussed are radiation safety, electromagnetic energy exposure events, and some of the more widespread issues of working at height, equipment fires, confined space work, electrical work, and other industrial hazards. Nuclear power plant industrial safety data are also included for comparison.

  9. IAEA Operational Safety Team Reviews Cattenom Nuclear Power Plant

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts led by the International Atomic Energy Agency (IAEA) has reviewed operational safety at France's Cattenom Nuclear Power Plant (NPP) noting a series of good practices as well as recommendations and suggestions to reinforce them. The IAEA assembled an international team of experts at the request of the Government of France to conduct an Operational Safety Review (OSART) of Cattenom NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 14 November to 1 December 2011. The team was made up of experts from Belgium, the Czech Republic, Finland, Germany, Hungary, Japan, Russia, Slovakia, South Africa, Sweden, Ukraine, the United Kingdom and the IAEA. The team at Cattenom conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; Emergency Planning and Preparedness; and Severe Accident Management. Cattenom is the first plant in Europe to voluntarily undertake a Severe Accident Management review during an OSART review. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: Sheets are displayed in storage areas where combustible material is present - these sheets are updated readily and accurately by the area owner to ensure that the fire limits are complied with; A simple container is attached to the neutron source handling device to ensure ease and safety of operations and reduce possible radiation exposure during use

  10. Desonide: a review of formulations, efficacy and safety.

    Science.gov (United States)

    Kahanek, Nr; Gelbard, Cg; Hebert, Aa

    2008-07-01

    Desonide is a low-potency topical corticosteroid that has been used for decades in the treatment of steroid-responsive dermatoses. The favorable safety profile of this topical agent makes it ideal for patients of all ages. This article provides a review of desonide's history, pharmacodynamic properties, vehicle technology, efficacy and safety. Randomized controlled trials, as well as open-label and non-comparative studies, case series and reports, experimental models, and data from the Galderma pharmacovigiliance program were reviewed in order to address the clinical efficacy and safety of desonide. Clinical efficacy and safety have been proven in multiple clinical trials. In addition to cream, lotion and ointment formulations, the recently developed hydrogel and foam preparations have increased desonide's versatility and patient tolerability.

  11. Undetected latent failures of safety-related systems. Preliminary survey of events in nuclear power plants 1980-1997

    International Nuclear Information System (INIS)

    Lydell, B.

    1998-03-01

    This report summarizes results and insights from a preliminary survey of events involving undetected, latent failures of safety-related systems. The survey was limited to events where mispositioned equipment (e.g., valves, switches) remained undetected, thus rendering standby equipment or systems unavailable for short or long time periods. Typically, these events were symptoms of underlying latent errors (e.g., design errors, procedure errors, unanalyzed safety conditions) and programmatic errors. The preliminary survey identified well over 300 events. Of these, 95 events are documented in this report. Events involving mispositioned equipment are commonplace. Most events are discovered soon after occurrence, however. But as evidenced by the survey results, some events remained undetected beyond several shift changes. The recommendations developed by the survey emphasize the importance of applying modern root cause analysis techniques to the event analysis to ensure that the causes and implications of occurred events are fully understood

  12. Review of the Federal Motor Carrier Safety Regulations for Automated Commercial Vehicles: Preliminary Assessment of Interpretation and Enforcement Challenges, Questions, and Gaps

    Science.gov (United States)

    2018-03-01

    The Volpe National Transportation Systems Center (Volpe) reviewed the Federal Motor Carrier Safety Regulations (FMCSRs) to identify compliance and enforcement challenges related to the operation of automated commercial vehicles (CMVs) in interstate c...

  13. 78 FR 11902 - Review of Gun Safety Technologies

    Science.gov (United States)

    2013-02-20

    ... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1615] Review of Gun Safety...'s Plan to reduce gun violence released on January 16, 2013, the U.S. Department of Justice, Office... emerging gun safety technologies and plans to issue a report on the availability and use of those...

  14. International Nuclear Safety Experts Conclude IAEA Peer Review of Swiss Regulatory Framework

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: A team of international nuclear safety experts today completed a two-week International Atomic Energy Agency (IAEA) review of the regulatory framework for nuclear safety in Switzerland. The Integrated Regulatory Review Service (IRRS) mission noted good practices in the Swiss system and also made recommendations for the nation's nuclear regulatory authority, the Swiss Federal Nuclear Safety Inspectorate (ENSI). ''Our team developed a good impression of the independent Swiss regulator - ENSI - and the team considered that ENSI deserves particular credit for its actions to improve Swiss safety capability following this year's nuclear accident in Japan,'' said IRRS Team Leader Jean-Christophe Niel of France. The mission's scope covered the Swiss nuclear regulatory framework for all types of nuclear-related activities regulated by ENSI. The mission was conducted from 20 November to 2 December, mainly at ENSI headquarters in Brugg. The team held extensive discussions with ENSI staff and visited many Swiss nuclear facilities. IRRS missions are peer reviews, not inspections or audits, and are conducted at the request of host nations. For the Swiss review, the IAEA assembled a team of 19 international experts from 14 countries. The experts came from Belgium, Brazil, the Czech Republic, Finland, France, Germany, Italy, the Republic of Korea, Norway, Russia, Slovakia, Sweden, the United Kingdom, and the United States. ''The findings of the IRRS mission will help us to further improve our work. That is part of our safety culture,'' said ENSI Director General Hans Wanner. ''As Switzerland argued at international nuclear safety meetings this year for a strengthening of the international monitoring of nuclear power, we will take action to fulfil the recommendations.'' The IRRS team highlighted several good practices of the Swiss regulatory system, including the following: ENSI requires Swiss nuclear operators to back-fit their facilities by continuously upgrading

  15. Packaging review guide for reviewing safety analysis reports for packagings: Revision 1

    International Nuclear Information System (INIS)

    Fisher, L.E.; Chou, C.K.; Lloyd, W.R.; Mount, M.E.; Nelson, T.A.; Schwartz, M.W.; Witte, M.C.

    1988-10-01

    The Department of Energy (DOE) has established procedures for obtaining certification of packagings used by DOE and its contractors for the transport of radioactive materials. The principal purpose of this document is to assure the quality and uniformity of PCS reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The Packaging Review Guide (PRG) also sets forth solutions and approaches determined to be acceptable in the past in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a SARP does not have to follow the solutions or approaches presented. It is also a purpose of the PRG to make information about DOE certification policy and procedures widely available to DOE field offices, DOE contractors, federal agencies, and interested members of the public. 77 refs., 16 figs., 15 tabs

  16. Safety review of experiments at Albuquerque Operations Office

    International Nuclear Information System (INIS)

    Elliott, K.

    1984-01-01

    The Department of Energy (DOE) Albuquerque Operations Office is responsible for the safety overview of nuclear reactor and critical assembly facilities at Sandia National Laboratories, Los Alamos National Laboratory, and the Rocky Flats Plant. The important safety concerns with these facilities involve the complex experiments that are performed, and that is the area emphasized. A determination is made by the Albuquerque Office (AL) with assistance from DOE/OMA whether or not a proposed experiment is an unreviewed safety question. Meetings are held with the contractor to resolve and clarify questions that are generated during the review of the proposed experiment. The AL safety evaluation report is completed and any recommendations are discussed. Prior to the experiment a preoperational appraisal is performed to assure that personnel, procedures, and equipment are in readiness for operations. During the experiment, any abnormal condition is reviewed in detail to determine any safety concerns

  17. Review of fuel safety criteria in France

    Energy Technology Data Exchange (ETDEWEB)

    Boutin, Sandrine; Graff, Stephanie; Foucher-Taisne, Aude; Dubois, Olivier [Institut de Radioprotection et du Surete Nucleaire, Fontenay-aux-Roses (France)

    2018-01-15

    Fuel safety criteria for the first barrier, based on state-of-the-art at the time, were first defined in the 1970s and came from the United States, when the French nuclear program was initiated. Since then, there has been continuous progress in knowledge and in collecting experimental results thanks to the experiments carried out by utilities and research institutes, to the operating experience, as well as to the generic R and D programs, which aim notably at improving computation methodologies, especially in Reactivity-Initiated accident and Loss-of-Coolant Accident conditions. In this context, the French utility EDF proposed new fuel safety criteria, or reviewed and completed existing safety demonstration covering the normal operating, incidental and accidental conditions of Pressurised Water Reactors. IRSN assessed EDF's proposals and presented its conclusions to the Advisory Committee for Reactors Safety of the Nuclear Safety Authority in June 2017. This review focused on the relevance of historical limit values or parameters of fuel safety criteria and their adequacy with the state-of-the-art concerning fuel physical phenomena (e.g. Pellet-Cladding Mechanical Interaction in incidental conditions, clad embrittlement due to high temperature oxidation in accidental conditions, clad ballooning and burst during boiling crisis and fuel melting).

  18. Review of fuel safety criteria in France

    International Nuclear Information System (INIS)

    Boutin, Sandrine; Graff, Stephanie; Foucher-Taisne, Aude; Dubois, Olivier

    2018-01-01

    Fuel safety criteria for the first barrier, based on state-of-the-art at the time, were first defined in the 1970s and came from the United States, when the French nuclear program was initiated. Since then, there has been continuous progress in knowledge and in collecting experimental results thanks to the experiments carried out by utilities and research institutes, to the operating experience, as well as to the generic R and D programs, which aim notably at improving computation methodologies, especially in Reactivity-Initiated accident and Loss-of-Coolant Accident conditions. In this context, the French utility EDF proposed new fuel safety criteria, or reviewed and completed existing safety demonstration covering the normal operating, incidental and accidental conditions of Pressurised Water Reactors. IRSN assessed EDF's proposals and presented its conclusions to the Advisory Committee for Reactors Safety of the Nuclear Safety Authority in June 2017. This review focused on the relevance of historical limit values or parameters of fuel safety criteria and their adequacy with the state-of-the-art concerning fuel physical phenomena (e.g. Pellet-Cladding Mechanical Interaction in incidental conditions, clad embrittlement due to high temperature oxidation in accidental conditions, clad ballooning and burst during boiling crisis and fuel melting).

  19. Standard review plan for reviewing safety analysis reports for dry metallic spent fuel storage casks

    International Nuclear Information System (INIS)

    1988-01-01

    The Cask Standard Review Plan (CSRP) has been prepared as guidance to be used in the review of Cask Safety Analysis Reports (CSARs) for storage packages. The principal purpose of the CSRP is to assure the quality and uniformity of storage cask reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The CSRP also sets forth solutions and approaches determined to be acceptable in the past by the NRC staff in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a CSAR does not have to follow the solutions or approaches presented in the CSRP. However, applicants should recognize that the NRC staff has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches

  20. 78 FR 14540 - Chlorpyrifos Registration Review; Preliminary Volatilization Assessment; Extension of Comment Period

    Science.gov (United States)

    2013-03-06

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2008-0850; FRL-9380-7] Chlorpyrifos Registration... Federal Register issue of February 6, 2013, concerning Chlorpyrifos Registration Review; Preliminary... volatilization assessment for the registration review of chlorpyrifos. EPA received requests from several...

  1. Packaging review guide for reviewing safety analysis reports for packagings: Revision 0

    International Nuclear Information System (INIS)

    Fischer, L.E.; Chou, C.K.; Lloyd, W.R.; Mount, M.E.; Nelson, T.A.; Schwartz, M.W.; Witte, M.C.

    1987-09-01

    The Department of Energy (DOE) has established procedures for obtaining certification of packagings used by DOE and its contractors for the transport of radioactive materials. These certification review policies and procedures are established to ensure that DOE packaging designs and operations meet safety criteria at least equivalent to the standards prescribed by the Nuclear Regulatory Commission (NRC) certification process for packaging. The Packaging Review Guide (PRG) is not a DOE order, but has been prepared as guidance for the Packaging Certification Staff (PCS) under the Certifying Official, Office of Security Evaluations, or designated representatives. The principal purpose of the PRG is to assure the quality and uniformity of PCS reviews, and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The PRG also sets forth solutions and approaches determined to be acceptable in the past by the PCS in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a SARP does not have to follow the solutions or approaches presented in the PRG. However, applicants should recognize that the PCS has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches. Finally, it is also a purpose of the PRG to make information about DOE certification policy and procedures widely available to DOE field offices, DOE contractors, federal agencies, and interested members of the public. 7 refs., 15 figs., 14 tabs

  2. International Expert Team Concludes IAEA Peer Review of Slovakia's Regulatory Framework for Nuclear Safety

    International Nuclear Information System (INIS)

    2012-01-01

    that consideration of these would enhance the overall performance of the regulatory system: Coordination and allocation of responsibilities among State Authorities in the area of safety and improvement of planning and coordination of their activities; The development of a national policy and strategy document for nuclear safety; and A unified national radiation monitoring system to ensure its results could be used by competent authorities in normal situations as well as during emergencies. In a preliminary report, the IAEA has conveyed the team's main conclusions to UJD SR. A final report will be submitted to the Government of Slovakia in about three months. UJD SR has informed the team that the final report will be publicly available. The IAEA encourages nations to invite a follow-up IRRS mission about two years after the mission has been completed. Background. The IRRS mission to Slovakia was conducted from 28 May to 7 June 2012, mainly in Bratislava. The IRRS team carried out a review of nuclear legal and regulatory framework for nuclear safety. Special attention was given to the review of the regulatory implications for Slovakia of the TEPCO Fukushima Daiichi accident. The review addressed all facilities regulated by UJD SR including nine nuclear power units, as well as spent fuel and waste management facilities. The IRRS mission did not include a comprehensive review of the national regulatory infrastructure for radiation safety of Slovakia, which is planned to be covered in the IRRS follow-up mission. Team experts came from twelve different countries: Belgium, Brazil, Czech Republic, Finland, France, Hungary, Romania, Slovenia, South Korea, Sweden, Ukraine and United Kingdom. The IRRS team consisted also of 6 IAEA staff members. Quick Facts. Slovakia has nine nuclear power reactors at two sites (Bohunice, Mochovce): 3 units are in decommissioning, four units are in operation and two units under construction. Slovakia has no other fuel cycle facilities or research

  3. Deep Brain Stimulation in Huntington’s Disease—Preliminary Evidence on Pathophysiology, Efficacy and Safety

    Directory of Open Access Journals (Sweden)

    Lars Wojtecki

    2016-08-01

    Full Text Available Huntington’s disease (HD is one of the most disabling degenerative movement disorders, as it not only affects the motor system but also leads to cognitive disabilities and psychiatric symptoms. Deep brain stimulation (DBS of the pallidum is a promising symptomatic treatment targeting the core motor symptom: chorea. This article gives an overview of preliminary evidence on pathophysiology, safety and efficacy of DBS in HD.

  4. Review on JMTR safety design for LEU core conversion

    International Nuclear Information System (INIS)

    Komori, Yoshihiro; Yokokawa, Makoto; Saruta, Toru; Inada, Seiji; Sakurai, Fumio; Yamamoto, Katsumune; Oyamada, Rokuro; Saito, Minoru

    1993-12-01

    Safety of the JMTR was fully reviewed for the core conversion to low enriched uranium fuel. Fundamental policies for the JMTR safety design were reconsidered based on the examination guide for safety design of test and research reactors, and safety of the JMTR was confirmed. This report describes the safety design of the JMTR from the viewpoint of major functions for reactor safety. (author)

  5. [Improving patient safety through voluntary peer review].

    Science.gov (United States)

    Kluge, S; Bause, H

    2015-01-01

    The intensive care unit (ICU) is one area of the hospital in which processes and communication are of primary importance. Errors in intensive care units can lead to serious adverse events with significant consequences for patients. Therefore quality and risk-management are important measures when treating critically ill patients. A pragmatic approach to support quality and safety in intensive care is peer review. This approach has gained significant acceptance over the past years. It consists of mutual visits by colleagues who conduct standardised peer reviews. These reviews focus on the systematic evaluation of the quality of an ICU's structure, its processes and outcome. Together with different associations, the State Chambers of Physicians and the German Medical Association have developed peer review as a standardized tool for quality improvement. The common goal of all stakeholders is the continuous and sustainable improvement in intensive care with peer reviews significantly increasing and improving communication between professions and disciplines. Peer reviews secure the sustainability of planned change processes and consequently lead the way to an improved culture of quality and safety.

  6. Geoscientific long-term prognosis. Preliminary safety analysis for the site Gorleben

    International Nuclear Information System (INIS)

    Mrugalla, Sabine

    2011-07-01

    The preliminary safety analysis of the site Gorleben includes the following chapters: (1) Introduction; (2) Aim and content of the geoscientific long-term prognosis for the site Gorleben; (3) Boundary conditions at the site Gorleben: climate; geomorphology; overlying rocks and adjoining rocks; hydrogeology; salt deposit Gorleben. (4) Probable future geological developments at the site Gorleben: supraregional developments with effects on the site Gorleben; glacial period developments; developments of the geomorphology, overlying and adjoining rocks; future developments of the hydrological systems at the site Gorleben; future saliniferous specific developments of the salt deposit Gorleben. (5) Commentary on the unlikely or excludable developments of the site Gorleben.

  7. Using systematic review in occupational safety and health.

    Science.gov (United States)

    Howard, John; Piacentino, John; MacMahon, Kathleen; Schulte, Paul

    2017-11-01

    Evaluation of scientific evidence is critical in developing recommendations to reduce risk. Healthcare was the first scientific field to employ a systematic review approach for synthesizing research findings to support evidence-based decision-making and it is still the largest producer and consumer of systematic reviews. Systematic reviews in the field of occupational safety and health are being conducted, but more widespread use and adoption would strengthen assessments. In 2016, NIOSH asked RAND to develop a framework for applying the traditional systematic review elements to the field of occupational safety and health. This paper describes how essential systematic review elements can be adapted for use in occupational systematic reviews to enhance their scientific quality, objectivity, transparency, reliability, utility, and acceptability. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  8. 78 FR 8522 - Chlorpyrifos Registration Review; Preliminary Evaluation of the Potential Risk From...

    Science.gov (United States)

    2013-02-06

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2008-0850; FRL-9376-5] Chlorpyrifos Registration... preliminary volatilization assessment for the registration review of chlorpyrifos and opens a public comment... assessment for chlorpyrifos uses. After reviewing comments received during the public comment period, EPA...

  9. SKI's and SSI's joint review of SKB's safety assessment report, SR 97. Summary

    International Nuclear Information System (INIS)

    2001-01-01

    The Swedish Nuclear Fuel and Waste Management Co (SKB) has a programme for the siting of a repository for spent nuclear fuel in Swedish bedrock. In 1996, the Swedish Government decided that SKB must perform an assessment of the repository's long-term safety before undertaking the next step of the programme which entails drilling in a minimum of two municipalities (site investigations). SKB has presented such a safety assessment in SR 97 Post-closure Safety (henceforth referred to as SR 97). SR 97 is one of the documents in the comprehensive reporting that SKB must provide when it proposes sites for investigation. The Swedish Nuclear Power Inspectorate (SKI) and the Swedish Radiation Protection Institute (SSI) have evaluated SR 97 in terms of its purposes which are to demonstrate a methodology for safety assessment, to show that Swedish bedrock can provide a safe repository using SKB's method, to provide a basis for specifying the factors that are important for site selection and to derive preliminary requirements on the function of the engineered barriers. The authorities have reached the following conclusions: SR 97 does not indicate any conditions that would mean that geological final disposal in accordance with SKB's method would have significant deficiencies in relation to the safety and radiation protection requirements of the authorities. SR 97 contains the elements required for a comprehensive assessment of safety and radiation protection. SKB's safety assessment methodology has improved within several important areas, such as the documentation of processes and properties that can affect repository performance and the development of models for safety assessment calculations. The methodology used in SR 97 has some deficiencies, for example, the specification of future events to be described in the safety assessment. SR 97 has not, to an adequate extent, dealt with unfavourable conditions that can affect the future safety of a repository. SKB states that the

  10. Standard Review Plan for the review of safety analysis reports for nuclear power plants: LWR edition

    International Nuclear Information System (INIS)

    1987-06-01

    The Standard Review Plan (SRP) is prepared for the guidance of staff reviewers in the Office of Nuclear Reactor Regulation in performing safety reviews of applications to construct or operate nuclear power plants. The principal purpose of the SRP is to assure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. It is also a purpose of the SRP to make information about regulatory matters widely available and to improve communication and understanding of the staff review process by interested members of the public and the nuclear power industry. The safety review is primarily based on the information provided by an applicant in a Safety Analysis Report (SAR). The SAR must be sufficiently detailed to permit the staff to determine whether the plant can be built and operated without undue risk to the health and safety of the public. The SAR is the principal document in which the applicant provides the information needed to understand the basis upon which this conclusion has been reached. The individual SRP sections address, in detail, who performs the review, the matters that are reviewed, the basis for review, how the review is accomplished, and the conclusions that are sought. The safety review is performed by 25 primary branches. One of the objectives of the SRP is to assign the review responsibilities to the various branches and to define the sometimes complex interfaces between them. Each SRP section identifies the branch that has the primary review responsibility for that section. In some review areas the primary branch may require support, and the branches that are assigned these secondary review responsibilities are also identified for each SRP section

  11. Immunization safety review: influenza vaccines and neurological complications

    National Research Council Canada - National Science Library

    Stratton, Kathleen R

    ..., unlike other vaccines. The Immunization Safety Review committee reviewed the data on influenza vaccine and neurological conditions and concluded that the evidence favored rejection of a causal relationship...

  12. IAEA Completes First Ever Corporate Safety Review, at Czech Republic's CEZ

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An international team of nuclear safety experts led by the International Atomic Energy Agency (IAEA) today completed a review of corporate safety performance at CEZ a.s., the largest national electricity company in the Czech Republic. For the first time since the Agency launched its Operational Safety Review Team (OSART) missions in 1982, the team addressed corporate aspects of a company in relation to nuclear safety. The team noted a series of good practices and proposed recommendations to strengthen some safety measures. Assembled at the request of the Government of the Czech Republic, the first ''Corporate OSART'' review, which ran from 30 September to 9 October 2013, addressed corporate aspects necessary to ensure the safe operation of the Dukovany and Temelin Nuclear Power Plants (NPPs). The mission included experts from Finland, France, Romania, USA and the IAEA. OSART services aim to improve operational safety at nuclear facilities by objectively assessing safety performance using the IAEA's Safety Standards and proposing recommendations for improvement where appropriate. The missions serve as a channel to exchange information and experience and provide Member States with good practices. A ''Corporate OSART'' is an OSART mission organized to review those centralized functions of the corporate organization of a utility with multiple nuclear plant sites and conventional plant sites that affect all the operational safety aspects of the nuclear power plants of this utility. ''OSART missions are one of the most important tools of the Agency to ensure better and wider implementation of the IAEA Safety Standards,'' said Denis Flory, Deputy Director General in the IAEA Department of Nuclear Safety and Security. ''Since 1982, we have conducted close to 200 safety review missions around the globe; however, this mission is the first of its kind because we focused on the corporate performance that is a necessity for a safe operation of NPPs,'' Flory added

  13. Undetected latent failures of safety-related systems. Preliminary survey of events in nuclear power plants 1980-1997

    Energy Technology Data Exchange (ETDEWEB)

    Lydell, B. [RSA Technologies, Vista, CA (United States)

    1998-03-01

    This report summarizes results and insights from a preliminary survey of events involving undetected, latent failures of safety-related systems. The survey was limited to events where mispositioned equipment (e.g., valves, switches) remained undetected, thus rendering standby equipment or systems unavailable for short or long time periods. Typically, these events were symptoms of underlying latent errors (e.g., design errors, procedure errors, unanalyzed safety conditions) and programmatic errors. The preliminary survey identified well over 300 events. Of these, 95 events are documented in this report. Events involving mispositioned equipment are commonplace. Most events are discovered soon after occurrence, however. But as evidenced by the survey results, some events remained undetected beyond several shift changes. The recommendations developed by the survey emphasize the importance of applying modern root cause analysis techniques to the event analysis to ensure that the causes and implications of occurred events are fully understood. 7 refs, 4 tabs, 3 figs. Also available at the SKI Home page: //www.ski.se.

  14. Review of probabilistic safety assessments by regulatory bodies

    International Nuclear Information System (INIS)

    2002-01-01

    This report provides guidance to assist regulatory bodies in carrying out reviews of the PSAs produced by utilities. In following this guidance, it is important that the regulatory body is able to satisfy itself that the PSA has been carried out to an acceptable standard and that it can be used for its intended applications. The review process becomes an important phase in determining the acceptability of the PSA since this provides a degree of assurance of the PSA scope, validity and limitations, as well as a better understanding of plants themselves. This report is also intended to assist technical experts managing or performing PSA reviews. A particular aim is to promote a standardized framework, terminology and form of documentation for the results of PSA reviews. The information presented in this report supports IAEA Safety Guide No. GS-G-1.2. Recommendations on the scope and methods to be used by the utility in the preparation of a PSA study is provided in IAEA Safety Guide No. NSG- 1.2. Information on these Safety Guides and other IAEA safety standards for nuclear power plants can be found on the following Internet site: http://www.iaea.org/ns/coordinet. The scope of this report covers the review of Level 1, 2 and 3 PSAs for event sequences occurring in all modes of plant operation (including full power, low power and shutdown). Where the scope of the analysis is narrower than this, a subset of the guidance can be identified and used. Information is provided on carrying out the review of a PSA throughout the PSA production process, i.e. from the initial decision to carry out the PSA through to the completion of the study and the production of the final PSA report. However, the same procedure can be applied to a completed PSA or to one already in progress. As a result of the performance of a PSA, changes to the design or operation of the plant are often identified that would increase the level of safety. This might include the addition of further safety

  15. Preliminary Evaluation of an Aviation Safety Thesaurus' Utility for Enhancing Automated Processing of Incident Reports

    Science.gov (United States)

    Barrientos, Francesca; Castle, Joseph; McIntosh, Dawn; Srivastava, Ashok

    2007-01-01

    This document presents a preliminary evaluation the utility of the FAA Safety Analytics Thesaurus (SAT) utility in enhancing automated document processing applications under development at NASA Ames Research Center (ARC). Current development efforts at ARC are described, including overviews of the statistical machine learning techniques that have been investigated. An analysis of opportunities for applying thesaurus knowledge to improving algorithm performance is then presented.

  16. Developing a disaster education program for community safety and resilience: The preliminary phase

    Science.gov (United States)

    Nifa, Faizatul Akmar Abdul; Abbas, Sharima Ruwaida; Lin, Chong Khai; Othman, Siti Norezam

    2017-10-01

    Resilience encompasses both the principles of preparedness and reaction within the dynamic systems and focuses responses on bridging the gap between pre-disaster activities and post-disaster intervention and among structural/non-structural mitigation. Central to this concept is the ability of the affected communities to recover their livelihood and inculcating necessary safety practices during the disaster and after the disaster strikes. While these ability and practices are important to improve the community safety and resilience, such factors will not be effective unless the awareness is present among the community. There have been studies conducted highlighting the role of education in providing awareness for disaster safety and resilience from a very young age. However for Malaysia, these area of research has not been fully explored and developed based on the specific situational and geographical factors of high-risk flood disaster locations. This paper explores the importance of disaster education program in Malaysia and develops into preliminary research project which primary aim is to design a flood disaster education pilot program in Kampung Karangan Primary School, Kelantan, Malaysia.

  17. IAEA Concludes Safety Review at Gravelines Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted a series of good practices and made recommendations to reinforce some safety measures during a review of operational safety at France's Gravelines Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 12 November 2012, focused on aspects essential to the safe operation of the NPP. The team was composed of experts from Bulgaria, China, Germany, Hungary, Japan, Romania, Slovakia, South Africa, Spain, Ukraine and the IAEA. The review covered the areas of management, organization and administration; training and qualification; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their possible use elsewhere. Examples include the following: - The Power Plant uses a staff-skills mapping process that significantly enhances knowledge of the facility's collective and individual skills and provides proactive management to address the loss of such skills; - As a measure to reduce the risk of workers' radiation exposure, the Power Plant uses a system to ensure that dose rate measurements are carried out at a precise distance from the source of radiation; and - Flood protection of the Power Plant is supported by special technical guidance documents and associated arrangements. The team identified a number of proposals for improvements to operational safety at Gravelines NPP. Examples include the following: - The Power Plant should reinforce its measures to prevent foreign objects from entering plant systems; - The Power Plant should ensure the 24-hour presence of an operator

  18. Patient safety culture in care homes for older people: a scoping review

    Directory of Open Access Journals (Sweden)

    Emily Gartshore

    2017-11-01

    Full Text Available Abstract Background In recent years, there has been an increasing focus on the role of safety culture in preventing incidents such as medication errors and falls. However, research and developments in safety culture has predominantly taken place in hospital settings, with relatively less attention given to establishing a safety culture in care homes. Despite safety culture being accepted as an important quality indicator across all health and social care settings, the understanding of culture within social care settings remains far less developed than within hospitals. It is therefore important that the existing evidence base is gathered and reviewed in order to understand safety culture in care homes. Methods A scoping review was undertaken to describe the availability of evidence related to care homes’ patient safety culture, what these studies focused on, and identify any knowledge gaps within the existing literature. Included papers were each reviewed by two authors for eligibility and to draw out information relevant to the scoping review. Results Twenty-four empirical papers and one literature review were included within the scoping review. The collective evidence demonstrated that safety culture research is largely based in the USA, within Nursing Homes rather than Residential Home settings. Moreover, the scoping review revealed that empirical evidence has predominantly used quantitative measures, and therefore the deeper levels of culture have not been captured in the evidence base. Conclusions Safety culture in care homes is a topic that has not been extensively researched. The review highlights a number of key gaps in the evidence base, which future research into safety culture in care home should attempt to address.

  19. Operating performance and environmental and safety risks: A preliminary comparison of majors and independents

    International Nuclear Information System (INIS)

    Pulsipher, A.G.; Iledare, W.O.; Baumann, R.H.; Mesyanzhinov, D.

    1995-01-01

    The objective is to compare the safety and environmental records of oil and gas companies operating on the OCS in the Gulf of Mexico over the past decade. The reason for doing so is to help inform public sector policy-makers and private sector decision-makers about the potential safety and environmental risks associated with the expected increased presence of smaller independents in the domestic oil and gas industry in general and on the federal OCS in particular. The preliminary conclusion is that although independents have had a modestly high incidence of fires and explosions than the majors, the difference is not significant statistically and is largely attributable to a few ''bad actors'' rather than demonstrably poorer practice by the group as a whole

  20. IAEA Completes Safety Review at Czech Nuclear Power Plant

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: An international team of nuclear safety experts, led by the International Atomic Energy Agency (IAEA), today completed a review of safety practices at Temelin Nuclear Power Station in the Czech Republic. The team highlighted the Power Plant's good practices and also recommended improvements to some safety measures. At the request of the Government of the Czech Republic, the IAEA assembled a team of nuclear installation safety experts to send an Operational Safety Review Team (OSART) to the Power Plant, and the mission was conducted from 5 to 22 November 2012. The team was comprised of experts from Brazil, Hungary, Slovakia, South Africa, Sweden, Ukraine and the United Kingdom. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the Plant's overall safety status. The team at Temelin conducted an in-depth review of the functions essential to the safe operation of the Power Plant, which are under the responsibility of the site's management. The review covered the areas of management, organization and administration; operations; maintenance; technical support; operating experience; radiation protection; chemistry; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of potential application elsewhere. Examples include the following: - The Power Plant has adopted effective computer software to improve the efficiency of the plant to prepare and isolate equipment for maintenance; - The Power Plant undertakes measures to control precisely the chemical parameters that limit corrosion in the reactor's coolant system, which in turn reduce radiation exposure to the workforce; and - The Temelin

  1. Independent peer review of nuclear safety computer codes

    International Nuclear Information System (INIS)

    Boyack, B.E.; Jenks, R.P.

    1993-01-01

    A structured, independent computer code peer-review process has been developed to assist the US Nuclear Regulatory Commission (NRC) and the US Department of Energy in their nuclear safety missions. This paper describes a structured process of independent code peer review, benefits associated with a code-independent peer review, as well as the authors' recent peer-review experience. The NRC adheres to the principle that safety of plant design, construction, and operation are the responsibility of the licensee. Nevertheless, NRC staff must have the ability to independently assess plant designs and safety analyses submitted by license applicants. According to Ref. 1, open-quotes this requires that a sound understanding be obtained of the important physical phenomena that may occur during transients in operating power plants.close quotes The NRC concluded that computer codes are the principal products to open-quotes understand and predict plant response to deviations from normal operating conditionsclose quotes and has developed several codes for that purpose. However, codes cannot be used blindly; they must be assessed and found adequate for the purposes they are intended. A key part of the qualification process can be accomplished through code peer reviews; this approach has been adopted by the NRC

  2. Nuclear Installation Safety: General Observations and Trends from IAEA Peer Reviews

    International Nuclear Information System (INIS)

    Rzentkowski, G.

    2016-01-01

    The Safety Review Services (SRSs) for nuclear installations address the needs of Member States at all stages of installations’ lifecycle. SRSs are based on the IAEA Safety Standards and are provided on Member States’ request to peer review national regulatory frameworks and safety provisions for nuclear installations. They result in recommendations and suggestions to improve national regulations and operational safety, and serve to exert peer pressure to ensure that that every Member State with nuclear installations recognizes its safety responsibility and the need to comply with the IAEA Safety Standards. This presentation provides an overview of SRSs for Nuclear Installations, including their structure and main subject areas. The presentation also summarizes general findings and trends which clearly demonstrate that there is continuous improvement in regulation of nuclear installations and in safety of their operation. Nevertheless, there is the need to further enhance the efficiency and effectiveness of SRSs through review of the overall governance model and service delivery to better serve the needs of Member States. The presentation points out some areas of improvements which have already been implemented or are being considered for implementation. Just as important, SRSs are conducted by teams of experts from around the world to strengthening international cooperation, ensure diversity and impartiality, and improve the overall quality of the safety review being conducted. The review team members are also provided with the opportunity for mutual learning and sharing good practices among themselves and with the Member State undergoing the review. As a result, SRAs play an important role in a quest to harmonize regulatory requirements and approaches globally. (author)

  3. Organization and conduct of IAEA fire safety reviews at nuclear power plants

    International Nuclear Information System (INIS)

    1998-01-01

    The importance of fire safety in the safe and productive operation of nuclear power plants is recognized worldwide. Lessons learned from experience in nuclear power plants indicate that fire poses a real threat to nuclear safety and that its significance extends far beyond the scope of a conventional fire hazard. With a growing understanding of the close correlation between the fire hazard in nuclear power plants and nuclear safety, backfitting for fire safety has become necessary for a number of operating plants. However, it has been recognized that the expertise necessary for a systematic independent assessment of fire safety of a NPP may not always be available to a number of Member States. In order to assist in enhancing fire safety, the IAEA has already started to offer various services to Member States in the area of fire safety. At the request of a Member State, the IAEA may provide a team of experts to conduct fire safety reviews of varying scope to evaluate the adequacy of fire safety at a specific nuclear power plant during various phases such as construction, operation and decommissioning. The IAEA nuclear safety publications related to fire protection and fire safety form a common basis for these reviews. This report provides guidance for the experts involved in the organization and conduct of fire safety review services to ensure consistency and comprehensiveness of the reviews

  4. Nulcear Safety: Technical progress review, October--December 1988

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E G [ed.

    1988-01-01

    Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  5. Preliminary post-closure safety assessment of repository concepts for low level radioactive waste at the Bruce Site, Ontario

    International Nuclear Information System (INIS)

    Little, R.H.; Penfold, J.S.S.; Egan, M.J.; Leung, H.

    2005-01-01

    The preliminary post-closure safety assessment of permanent repository concepts for low-level radioactive waste (LLW) at the Ontario Power Generation (OPG) Bruce Site is described. The study considered the disposal of both short and long-lived LLW. Four geotechnically feasible repository concepts were considered (two near-surface and two deep repositories). An approach consistent with best international practice was used to provide a reasoned and comprehensive analysis of post-closure impacts of the repository concepts. The results demonstrated that the deep repository concepts in shale and in limestone, and the surface repository concept on sand should meet radiological protection criteria. For the surface repository concept on glacial till, it appears that increased engineering such as grouting of waste and voids should be considered to meet the relevant dose constraint. Should the project to develop a permanent repository for LLW proceed, it is expected that this preliminary safety assessment would need to be updated to take account of future site-specific investigations and design updates. (author)

  6. Design review report for modifications to RMCS safety class equipment

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1997-01-01

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable

  7. Design review report for modifications to RMCS safety class equipment

    Energy Technology Data Exchange (ETDEWEB)

    Corbett, J.E.

    1997-05-30

    This report documents the completion of the formal design review for modifications to the Rotary Mode Core Sampling (RMCS) safety class equipment. These modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to approve the Engineering Change Notices affecting safety class equipment used in the RMCS system. The conclusion reached by the review committee was that these changes are acceptable.

  8. 49 CFR 209.501 - Review of rail transportation safety and security route analysis.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Review of rail transportation safety and security....820 § 209.501 Review of rail transportation safety and security route analysis. (a) Review of route... establish that the route chosen by the carrier poses the least overall safety and security risk, the...

  9. Customer Relationship Management System in Occupational Safety & Health Companies: Research on Practice and Preliminary Design Solution

    Directory of Open Access Journals (Sweden)

    Robert Fabac

    2011-10-01

    Full Text Available One of the most prominent contemporary trends in formation of companies is the approach to development of a customer-oriented company. In this matter, various versions related to the intensity of this orientation are differentiated. Customer relationship management (CRM system is a well-known concept, and its practice is being studied and improved in connection to various sectors. Companies providing services of occupational safety and health (OHS mainly cooperate with a large number of customers and the quality of this cooperation largely affects the occupational safety and health of employees. Therefore, it is of both scientific and wider social interest to study and improve the relationship of these companies with their customers. This paper investigates the practice of applying CRM in Croatian OHS companies. It identifies the existing conditions and suggests possible improvements in the practice of CRM, based on experts’ assessments using analytic hierarchy process evaluation. Universal preliminary design was created as a framework concept for the formation of a typical customer-oriented OHS services company. Preliminary design includes a structural view, which provides more details through system diagrams, and an illustration of main cooperation processes of a company with its customer.

  10. SALTO Peer Review Guidelines. Guidelines for Peer Review of Safety Aspects of Long Term Operation of Nuclear Power Plants

    International Nuclear Information System (INIS)

    2014-01-01

    International peer review is a useful tool for Member States to exchange experiences, learn from each other and apply good practices in the long term operation (LTO) of nuclear power plants (NPPs). The peer review is also an important mechanism through which the IAEA supports Member States in enhancing the safety of NPPs. The IAEA has conducted various types of safety review that indirectly address aspects of LTO, including safety reviews for design, engineering, operation and external hazards. Operational Safety Review Team (OSART) services include review of ageing management programmes. In addition, several Member States have requested Ageing Management Assessment Team (AMAT) missions. Through these experiences, it was recognized that a comprehensive peer review on LTO would be very useful to Member States. The Safety Aspects of Long Term Operation (SALTO) peer review addresses strategy and key elements for the safe LTO of NPPs, which includes AMAT objectives and complements OSART reviews. The SALTO peer review is designed to assist operating organizations in adopting a proper approach to LTP including implementing appropriate activities to ensure that plant safety will be maintained during the LTO period. The SALTO peer review can be tailored to focus on ageing management programmes (AMPs) or on other activities related to LTO to support the Member State in enhancing the safety of its NPPs. The SALTO peer review can also support regulators in establishing or improving regulatory and licensing strategies for the LTO of NPPs. The guidelines in this publication are primarily intended for members of a SALTO review team and provide a basic structure and common reference for peer reviews of LTO. Additionally, the guidelines also provide useful information to the operating organizations of NPPs (or technical support organizations) for carrying out their own self-assessments or comprehensive programme reviews. The guidelines are intended to be generic, as there are

  11. Preliminary safety evaluation of an aircraft impact on a near-surface radioactive waste repository

    Energy Technology Data Exchange (ETDEWEB)

    Lo Frano, R.; Forasassi, G.; Pugliese, G. [Department of Industrial and Civil Engineering (DICI), University of Pisa, Pisa (Italy)

    2013-07-01

    The aircraft impact accident has become very significant in the design of a nuclear facilities, particularly, after the tragic September 2001 event, that raised the public concern about the potential damaging effects that the impact of a large civilian airplane could bring in safety relevant structures. The aim of this study is therefore to preliminarily evaluate the global response and the structural effects induced by the impact of a military or commercial airplane (actually considered as a 'beyond design basis' event) into a near surface radioactive waste (RWs) disposal facility. The safety evaluation was carried out according to the International safety and design guidelines and in agreement with the stress tests requirements for the security track. To achieve the purpose, a lay out and a scheme of a possible near surface repository, like for example those of the El Cabril one, were taken into account. In order to preliminarily perform a reliable analysis of such a large-scale structure and to determine the structural effects induced by such a types of impulsive loads, a realistic, but still operable, numerical model with suitable materials characteristics was implemented by means of FEM codes. In the carried out structural analyses, the RWs repository was considered a 'robust' target, due to its thicker walls and main constitutive materials (steel and reinforced concrete). In addition to adequately represent the dynamic response of repository under crashing, relevant physical phenomena (i.e. penetration, spalling, etc.) were simulated and analysed. The preliminary assessment of the effects induced by the dynamic/impulsive loads allowed generally to verify the residual strength capability of the repository considered. The obtained preliminary results highlighted a remarkable potential to withstand the impact of military/large commercial aircraft, even in presence of ongoing concrete progressive failure (some penetration and spalling of the

  12. Preparation of NPP Dukovany periodic safety review

    International Nuclear Information System (INIS)

    Dubsky, L.; Vymazal, P.

    2004-01-01

    Dukovany NPP in Czech Republic performs a periodic safety review for the second time after approximately 20 years of operation. The history of the Safety Report and its transformation into an internationally accepted form complying with IAEA standards is described. The deterministic and probabilistic assessment of the plant's safety-related design and state is applied to determine whether and to what extend the relevant protective goals are fulfilled by the existing plant design. A description of the step-by-step process is presented together with the creation of methods and criteria for PSR evaluation prepared by Nuclear Research Institute Rez

  13. IAEA Concludes Safety Review at Chooz Nuclear Power Plant in France

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An IAEA-led international team of nuclear safety experts noted good practices and made recommendations to reinforce safety measures during a review of operational safety at France's Chooz Nuclear Power Plant (NPP) that concluded today. The Operational Safety Review Team (OSART) was assembled at the French Government's request. The in-depth review, which began 17 June, focused on aspects essential to the safe operation of the NPP. The team comprised experts from Switzerland, Belgium, Germany, China, India, United Kingdom, Czech Republic, Canada, Hungary and the IAEA. The review covered the areas of management, organization and administration; training and qualification of personnel; operations; maintenance; technical support; operating experience; radiation protection; chemistry; emergency planning and preparedness; and severe accident management. The conclusions of the review are based on the IAEA's Safety Standards. The OSART team identified good plant practices that will be shared with the rest of the nuclear industry for consideration. Examples include: The plant has a professional development programme as part of a joint employment effort shared by the plant and its contractors. This enables trainees to develop professional capability, understand practices and gain experience from other nuclear power plants in terms of work planning and coordination; The plant has built a strong relationship between the on-shift response team of the plant and the local fire brigade to improve firefighting and rescue operations; Self-assessment groups discuss and resolve specific issues within operations, empowering operations personnel to take ownership of improvement programmes; and The plant has improved warnings at entrances to all o range zones , areas of elevated dose rates to which only authorized staff have access. The team identified a number of improvements to operational safety at Chooz NPP. Examples include: The plant should review its process for the

  14. Review and assessment of nuclear facilities by the regulatory body. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on reviewing and assessing the various safety related submissions made by the operator of a nuclear facility at different stages (siting, design, construction, commissioning, operation and decommissioning or closure) in the facility's lifetime to determine whether the facility complies with the applicable safety objectives and requirements. This Safety Guide covers the review and assessment of submissions in relation to the safety of nuclear facilities such as: enrichment and fuel manufacturing plants. Nuclear power plants. Other reactors such as research reactors and critical assemblies. Spent fuel reprocessing plants. And facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Objectives, management, planning and organizational matters relating to the review and assessment process are presented in Section 2. Section 3 deals with the bases for decision making and conduct of the review and assessment process. Section 4 covers aspects relating to the assessment of this process. The Appendix provides a generic list of topics to be covered in the review and assessment process

  15. Review and assessment of nuclear facilities by the regulatory body. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on reviewing and assessing the various safety related submissions made by the operator of a nuclear facility at different stages (siting, design, construction, commissioning, operation and decommissioning or closure) in the facility's lifetime to determine whether the facility complies with the applicable safety objectives and requirements. This Safety Guide covers the review and assessment of submissions in relation to the safety of nuclear facilities such as: enrichment and fuel manufacturing plants. Nuclear power plants. Other reactors such as research reactors and critical assemblies. Spent fuel reprocessing plants. And facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Objectives, management, planning and organizational matters relating to the review and assessment process are presented in Section 2. Section 3 deals with the bases for decision making and conduct of the review and assessment process. Section 4 covers aspects relating to the assessment of this process. The Appendix provides a generic list of topics to be covered in the review and assessment process

  16. Patient Safety and Workplace Bullying: An Integrative Review.

    Science.gov (United States)

    Houck, Noreen M; Colbert, Alison M

    Workplace bullying is strongly associated with negative nursing outcomes, such as work dissatisfaction, turnover, and intent to leave; however, results of studies examining associations with specific patient safety outcomes are limited or nonspecific. This integrative review explores and synthesizes the published articles that address the impact of workplace nurse bullying on patient safety.

  17. Deep repository for long-lived low- and intermediate-level waste in Sweden (SFL 3-5): An international peer review of SKB 's preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, N. [QuantiSci Ltd, Melton Mowbray (United Kingdom); Apted, M. [Monitor Scientific, Denver, CO (United States); Glasser, F. [Univ. of Aberdeen (United Kingdom). Dept. of Chemistry; Kessler, J. [EPRI, Inc., Palo Alto, CA (United States); Voss, C. [US Geological Survey, Reston, VA (United States)

    2000-10-01

    The SKB safety assessment of the SFL 3-5 repository (the planned deep repository for long-lived low- and intermediate level waste) can be read in two contexts: as a preliminary evaluation of the performance and design options for a repository that will not be required for perhaps forty years; or as an evaluation of a repository that might need to be sited together with the SFL 2 spent fuel repository, and whose nature and performance might thus need to be understood to a level that can be used to make wider programmatic decisions during the next five years. These two 'assessment contexts' are quite different, and an overarching issue is the fact that it was not clear to the review team which view to take. Apparently, SKB would tend towards the first context. However, it is not at all apparent to the reviewers why the second context should not be the predominant driver in the near future. The review team notes that the SFL 3-5 repository, as modelled by SKB, gives rise to potentially perceptible radionuclide releases to the environment on a timescale of hundreds of years after closure. This is in contrast to the SR 97 assessment for the SFL 2 spent fuel repository, which base scenario predicts no releases over a million year timescale. It is clear that according to SKB's SR97 and SFL3-5 analyses, for co-located facilities, it is this repository that has the potential for real radiological impacts in the immediate future. An initial recommendation from the review, is that SKB and the regulatory authorities consider which context is appropriate to the current status of the Swedish programme. This is important, because an overall impression of the reviewers is that the analysis would not be 'fit for purpose' if it were needed to assist with decision-making by SKB or the regulatory agencies. There are too many unanswered questions, and the overall impression of the safety concept is one of some fragility. Because there is no real design basis

  18. A study on the methodology of probabilistic safety assessment for KALIMER

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwan Seong; Kwon, Young Min; Lee, Yong Bum; Jeong, Hae Yong; Yang, Joon Eon; Ha, Kyu Suk; Hahn, Do Hee [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2002-03-01

    Existing Probabilistic Safety Assessment(PSA) is a method for Light Water Reactor or Pressurized Heavy Water Reactor. Because KALIMER is different from these reactor, the new methodology of PSA need to be developed. In this paper, the PSA of Power Reactor Inherently Safety Module(PRISM) is analyzed, and Initiating Event such as Experiential Assessment, Logical Assessment and Failure Mode Effect Analysis(FMEA) is reviewed. Also, Pipe Damage Frequency Method is suggested for KALIMER. And the Reliability Physical method of Passive System, which is a chief safety system of KALIMER, is reviewed and its applicability is investigated. Finally, for the Preliminary PSA of KALIMER, Intermediate Heat Transfer System is analyzed. 23 refs., 10 figs., 13 tabs. (Author)

  19. Monitoring and reviewing research reactor safety in Australia

    International Nuclear Information System (INIS)

    Cairns, R.C.; Greenslade, G.K.

    1990-01-01

    Th research reactors operated by the Australian Nuclear Science and Technology Organization (ANSTO) comprise the 10 MW reactor HIFAR and the 100 kW reactor Moata. Although there are no power reactors in Australia the problems and issues of public concern which arise in the operation of research reactors are similar to those of power reactors although on a smaller scale. The need for independent safety surveillance has been recognized by the Australian Government and the ANSTO Act, 1987, required the Board of ANSTO to establish a Nuclear Safety Bureau (NSB) with responsibility to the Minister for monitoring and reviewing the safety of nuclear plant operated by ANSTO. The Executive Director of ANSTO operates HIFAR subject to compliance with requirements and arrangements contained in a formal Authorization from the Board of ANSTO. A Ministerial Direction to the Board of ANSTO requires the NSB to report to him, on a quarterly basis, matters relating to its functions of monitoring and reviewing the safety of ANSTO's nuclear plant. Experience has shown that the Authorization provides a suitable framework for the operational requirements and arrangements to be organised in a disciplined and effective manner, and also provides a basis for audits by the NSB by which compliance with the Board's safety requirements are monitored. Examples of the way in which the NSB undertakes its monitoring and reviewing role are given. Moata, which has a much lower operating power level and fission product inventory than HIFAR, has not been subject to a formal Authorization to date but one is under preparation

  20. International Nuclear Officials Discuss IAEA Peer Reviews of Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: Senior nuclear regulators today concluded a Workshop on the Lessons Learned from the IAEA Integrated Regulatory Review Service (IRRS) Missions. The U.S. Nuclear Regulatory Commission (NRC) hosted the workshop, in cooperation with the International Atomic Energy Agency, in Washington, DC, from 26 to 28 October 2011. About 60 senior regulators from 22 IAEA Member States took part in this workshop. The IRRS programme is an international peer review service offered by the IAEA to its Member States to provide an objective evaluation of their nuclear safety regulatory framework. The review is based on the internationally recognized IAEA Safety Standards. ''The United States Nuclear Regulatory Commission was pleased to host the IAEA's IRRS meeting this week. The discussions over the past three days have provided an important opportunity for regulators from many countries to come together to strengthen the international peer review process,'' said U.S. NRC Chairman Gregory B. Jaczko. ''Especially after the Fukushima Daiichi accident, the global community recognizes that IRRS missions fill a vital role in strengthening nuclear safety and security programs around the world, and we are proud to be a part of this important effort.'' The IAEA Action Plan on Nuclear Safety includes actions focused towards strengthening the existing IAEA peer reviews, incorporating lessons learned and improving their effectiveness. The workshop provided a platform for the exchange of information, experience and lessons learned from the IRRS missions, as well as expectations for the IRRS programme for the near future. Further improvements in the planning and implementation of the IRRS missions in the longer term were discussed. A strong commitment of all relevant national authorities to the IRRS programme was identified as a key element of an effective regulatory framework. The conclusions of the workshop will be issued in November 2011 and the main results will be reported to the IAEA

  1. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  2. Preliminary safety evaluation for a medical therapy reactor

    International Nuclear Information System (INIS)

    Jones, J.L.; Neuman, W.A.

    1989-01-01

    A conceptual design of a passively safe reactor facility for boron neutron capture therapy has been previously described. The medical therapy reactor (MTR) has a maximum power level of 10 MW(thermal) and utilizes 45 wt% uranium in UZrH, 20 wt% 235 U enriched hydride fuel matrix with 1 wt% erbium, which is a burnable poison and provides prompt negative reactivity feedback. The facility has five beam ports for patient treatment and advanced neutron beam research and is capable of 2,000 to 10,000 treatments per year, assuming single 8h/day, 5 day/week operation. The epithermal treatment flux from the beam ports is large, enabling single-session treatment of brain cancers of <10-min duration, with minimal fast neutron and gamma contaminants. The reactor core is designed with sufficient excess reactivity to yield a core lifetime equal to a facility lifetime of 30 yr. A preliminary safety evaluation was performed using the RELAP5 thermal-hydraulic code. The analysis addressed accidents in several major categories, including a pump coastdown, a loss of secondary heat sink, and a $0.5 step reactivity insertion

  3. Safety evaluation report related to the preliminary design of the Standard Nuclear Steam Supply Reference System, RESAR SP/90 (Docket No. STN 50-601)

    International Nuclear Information System (INIS)

    1991-04-01

    On October 24, 1983, the Westinghouse Electric Corporation tendered its application for a preliminary design approval of the advanced pressurized-water reactor design for the SP/90 reactor. The Westinghouse Reference Safety Analysis Report (RESAR SP/90, Docket No. STN 50-601), describing the design of the facility, was submitted from October 24, 1983 through March 9, 1987. Staff of the US Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, has prepared this safety evaluation report of the RESAR SP/90 on the basis of its review. Because of the stage of the design, there are open issues that have not been resolved. These issues are discussed in detail throughout this report, and a summary is provided in Section 1.6 of this report. The applicant will be required to address these and any additional such concerns that may be raised during the course of the staff's review of advanced light-water reactors in support of a final design approval application. This report shall not constitute a commitment to issue a permit or license or in any way affect the authority of the Commission, its adjudicatory boards, and other presiding officers in any proceeding under Subpart G of Title 10 of the Code of Federal Regulations, Part 2

  4. Posiva's application for a decision in principle concerning a disposal facility for spent nuclear fuel. STUK's statement and preliminary safety appraisal

    Energy Technology Data Exchange (ETDEWEB)

    Ruokola, E. [ed.

    2000-03-01

    In May 1999, Posiva Ltd submitted to the Government an application, pursuant to the Nuclear Energy Act, for a Decision in Principle on a disposal facility for spent nuclear fuel from the Finnish nuclear power plants. The Ministry of Trade and Industry requested the Radiation and Nuclear Safety Authority (STUK) to draw up a preliminary safety appraisal concerning the proposed disposal facility. In the beginning of this report, STUK's statement to the Ministry and Industry concerning the proposed disposal facility is given. In that statement, STUK concludes that the Decision in Principle is currently justified from the standpoint of safety. The statement is followed by a safety appraisal, where STUK deems, how the proposed disposal concept, site and facility comply with the safety requirements included in the Government's Decision (478/1999). STUK's preliminary safety appraisal was supported by contributions from a number of outside experts. A collective opinion by an international group of ten distinguished experts is appended to this report. (orig.)

  5. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review

    Science.gov (United States)

    Hall, Louise H.; Johnson, Judith; Watt, Ian; Tsipa, Anastasia; O’Connor, Daryl B.

    2016-01-01

    Objective To determine whether there is an association between healthcare professionals’ wellbeing and burnout, with patient safety. Design Systematic research review. Data Sources PsychInfo (1806 to July 2015), Medline (1946 to July 2015), Embase (1947 to July 2015) and Scopus (1823 to July 2015) were searched, along with reference lists of eligible articles. Eligibility Criteria for Selecting Studies Quantitative, empirical studies that included i) either a measure of wellbeing or burnout, and ii) patient safety, in healthcare staff populations. Results Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all) subscales of the burnout measures employed, and patient safety. Conclusions Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed. Implications This review illustrates the need for healthcare organisations to consider improving employees’ mental health as well as creating safer work environments when planning interventions to improve patient safety. Systematic Review Registration PROSPERO registration number: CRD42015023340. PMID:27391946

  6. Preliminary safety criteria for organic watch list tanks at the Hanford site

    International Nuclear Information System (INIS)

    Webb, A.B.; Stewart, J.L.; Turner, O.A.; Plys, M.G.; Malinovic, B.; Grigsby, J.M.; Camaioni, D.M.; Heasler, P.G.; Samuels, W.O.; Toth, J.J.

    1995-11-01

    Condensed-phase, rapid reactions of organic salts with nitrates/nitrites in Hanford High Level Radioactive Waste single-shell tanks could lead to structural failure of the tanks resulting in significant releases of radionuclides and toxic materials. This report establishes appropriate preliminary safety criteria to ensure that tank wastes will be maintained safe. These criteria show that if actual dry wastes contain less than 1.2 MJ/kg of reactants reaction energy or less 4.5 wt % of total organic carbon, then the waste will be safe and will not propagate if ignited. Waste moisture helps to retard reactions; when waste moisture exceeds 20 wt %, rapid reactions are prevented, regardless of organic carbon concentrations. Aging and degradation of waste materials has been considered to predict the types and amounts to organic compounds present in the waste. Using measurements of 3 waste phases (liquid, salt cake, and sludge) obtained from tank waste samples analyzed in the laboratory, analysis of variance (ANOVA) models were used to estimate waste states for unmeasured tanks. The preliminary safety criteria are based upon calorimetry and propagation testing of likely organic compounds which represent actual tank wastes. These included sodium salts of citrate, formate, acetate and hydroxyethylethylenediaminetricetate (HEDTA). Hot cell tests of actual tank wastes are planned for the future to confirm propagation tests performed in the laboratory. The effects of draining liquids from the tanks which would remove liquids and moisture were considered because reactive waste which is too dry may propagate. Evaporation effects which could remove moisture from the tanks were also calculated. The various ways that the waste could be heated or ignited by equipment failures or tank operations activities were considered and appropriate monitoring and controls were recommended

  7. Preliminary safety criteria for organic watch list tanks at the Hanford site

    Energy Technology Data Exchange (ETDEWEB)

    Webb, A.B.; Stewart, J.L.; Turner, O.A. [Westinghouse Hanford Co., Richland, WA (United States); Plys, M.G.; Malinovic, B. [Fauske and Associates, Inc., Burr Ridge, IL (United States); Grigsby, J.M. [G & P Consulting, Inc. (United States); Camaioni, D.M.; Heasler, P.G.; Samuels, W.O.; Toth, J.J. [Pacific Northwest Lab., Portland, OR (United States)

    1995-11-01

    Condensed-phase, rapid reactions of organic salts with nitrates/nitrites in Hanford High Level Radioactive Waste single-shell tanks could lead to structural failure of the tanks resulting in significant releases of radionuclides and toxic materials. This report establishes appropriate preliminary safety criteria to ensure that tank wastes will be maintained safe. These criteria show that if actual dry wastes contain less than 1.2 MJ/kg of reactants reaction energy or less 4.5 wt % of total organic carbon, then the waste will be safe and will not propagate if ignited. Waste moisture helps to retard reactions; when waste moisture exceeds 20 wt %, rapid reactions are prevented, regardless of organic carbon concentrations. Aging and degradation of waste materials has been considered to predict the types and amounts to organic compounds present in the waste. Using measurements of 3 waste phases (liquid, salt cake, and sludge) obtained from tank waste samples analyzed in the laboratory, analysis of variance (ANOVA) models were used to estimate waste states for unmeasured tanks. The preliminary safety criteria are based upon calorimetry and propagation testing of likely organic compounds which represent actual tank wastes. These included sodium salts of citrate, formate, acetate and hydroxyethylethylenediaminetricetate (HEDTA). Hot cell tests of actual tank wastes are planned for the future to confirm propagation tests performed in the laboratory. The effects of draining liquids from the tanks which would remove liquids and moisture were considered because reactive waste which is too dry may propagate. Evaporation effects which could remove moisture from the tanks were also calculated. The various ways that the waste could be heated or ignited by equipment failures or tank operations activities were considered and appropriate monitoring and controls were recommended.

  8. Nuclear Safety: Technical progress review, January--March 1989

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E. G. [ed.

    1989-01-01

    This review journal covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  9. Second periodic safety review of Angra Nuclear Power Station, unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M., E-mail: ottoncf@tecnatom.com.br, E-mail: emfreire46@gmail.com, E-mail: robcrepaldi@hotmail.com [Tecnatom do Brasil Engenharia e Servicos Ltda, Rio de Janeiro, RJ (Brazil); Campello, Sergio A., E-mail: sacampe@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  10. Second periodic safety review of Angra Nuclear Power Station, unit 1

    International Nuclear Information System (INIS)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M.; Campello, Sergio A.

    2015-01-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  11. Use of FPGA and CPLD in nuclear reactor safety systems and its regulatory review requirements for reactor safety

    International Nuclear Information System (INIS)

    Roy, Suvadip; Biswas, Animesh; Pradhan, S.K.

    2015-01-01

    Field Programmable Gate Arrays (FPGA) and Complex Programmable Logic Devices (CPLD) is being used widely in safety critical and safety related systems in nuclear power plans like in trip logic units, Engineered Safety Feature (ESF) actuation decision logic and neutronic signal processing for their reprogrammability feature and compact design. These HDL Programmable devices (HPD) are complex devices consisting of both hardware and software which is used to implement the logic on the FPGA. It is observed that these Programmable devices suffer from various modes of failure and the major failures in these devices are due to Single Event Upset (SEU), where a highly energetic ionizing radiation may lead to device failure which can even occur in radiologically benign environment. Other failures can occur during steps of developing the hardware using software tools like during Synthesis and placement and routing of the desired hardware. Here a study on use of such devices in Nuclear Reactors, study on mode of failures of these devices, way to tackle such failure and development of review guidelines for review of such devices used in safety critical and safety related systems with special emphasis on choice of software tools, way to mitigate effects of SEU and simulation and hardware testing results to be reviewed by regulatory body during design safety review is done. (author)

  12. Deep repository for long-lived low- and intermediate-level waste in Sweden (SFL 3-5): An international peer review of SKB 's preliminary safety assessment

    International Nuclear Information System (INIS)

    Chapman, N.; Apted, M.; Glasser, F.; Voss, C.

    2000-10-01

    The SKB safety assessment of the SFL 3-5 repository (the planned deep repository for long-lived low- and intermediate level waste) can be read in two contexts: as a preliminary evaluation of the performance and design options for a repository that will not be required for perhaps forty years; or as an evaluation of a repository that might need to be sited together with the SFL 2 spent fuel repository, and whose nature and performance might thus need to be understood to a level that can be used to make wider programmatic decisions during the next five years. These two 'assessment contexts' are quite different, and an overarching issue is the fact that it was not clear to the review team which view to take. Apparently, SKB would tend towards the first context. However, it is not at all apparent to the reviewers why the second context should not be the predominant driver in the near future. The review team notes that the SFL 3-5 repository, as modelled by SKB, gives rise to potentially perceptible radionuclide releases to the environment on a timescale of hundreds of years after closure. This is in contrast to the SR 97 assessment for the SFL 2 spent fuel repository, which base scenario predicts no releases over a million year timescale. It is clear that according to SKB's SR97 and SFL3-5 analyses, for co-located facilities, it is this repository that has the potential for real radiological impacts in the immediate future. An initial recommendation from the review, is that SKB and the regulatory authorities consider which context is appropriate to the current status of the Swedish programme. This is important, because an overall impression of the reviewers is that the analysis would not be 'fit for purpose' if it were needed to assist with decision-making by SKB or the regulatory agencies. There are too many unanswered questions, and the overall impression of the safety concept is one of some fragility. Because there is no real design basis presented, no thorough

  13. Safety assessment of Olkiluoto NPP units 1 and 2. Decision of the Radiation and Nuclear Safety Authority regarding the periodic safety review of the Olkiluoto NPP

    International Nuclear Information System (INIS)

    2010-02-01

    In this safety assessment the Radiation and Nuclear Safety Authority (STUK) has evaluated the safety of the Olkiluoto Nuclear Power Plant units 1 and 2 in connection with the periodic safety review. This safety assessment provides a summary of the reviews, inspections and continuous oversight carried out by STUK. The issues addressed in the assessment and the related evaluation criteria are set forth in the nuclear energy and radiation safety legislation and the regulations issued thereunder. The provisions of the Nuclear Energy Act concerning the safe use of nuclear energy, security and emergency preparedness arrangements, and waste management are specified in more detail in the Government Decrees and Regulatory Guides issued by STUK. Based on the assessment, STUK consideres that the Olkiluoto Nuclear Power Plant units 1 and 2 meet the set safety requirements for operational nuclear power plants, the emergency preparedness arrangements are sufficient and the necessary control to prevent the proliferation of nuclear weapons has been appropriately arranged. The physical protection of the Olkiluoto nuclear power plant is not yet completely in compliance with the requirements of Government Decree 734/2008, which came into force in December 2008. Further requirements concerning this issue based also on the principle of continuous improvement were included in the decision relating to the periodic safety review. The safety of the Olkiluoto nuclear power plant was assessed in compliance with the Government Decree on the Safety of Nuclear Power Plants (733/2008), which came into force in 2008. The decree notes that existing nuclear power plants need not meet all the requirements set out for new plants. Most of the design bases pertaining to the Olkiluoto 1 and 2 nuclear power plant units were set in the 1970s. Substantial modernisations have been carried out at the Olkiluoto 1 and 2 nuclear power plant units since their commissioning to improve safety. This is in line with

  14. Economic evaluation in patient safety: a literature review of methods.

    Science.gov (United States)

    de Rezende, Bruna Alves; Or, Zeynep; Com-Ruelle, Laure; Michel, Philippe

    2012-06-01

    Patient safety practices, targeting organisational changes for improving patient safety, are implemented worldwide but their costs are rarely evaluated. This paper provides a review of the methods used in economic evaluation of such practices. International medical and economics databases were searched for peer-reviewed publications on economic evaluations of patient safety between 2000 and 2010 in English and French. This was complemented by a manual search of the reference lists of relevant papers. Grey literature was excluded. Studies were described using a standardised template and assessed independently by two researchers according to six quality criteria. 33 articles were reviewed that were representative of different patient safety domains, data types and evaluation methods. 18 estimated the economic burden of adverse events, 3 measured the costs of patient safety practices and 12 provided complete economic evaluations. Healthcare-associated infections were the most common subject of evaluation, followed by medication-related errors and all types of adverse events. Of these, 10 were selected that had adequately fulfilled one or several key quality criteria for illustration. This review shows that full cost-benefit/utility evaluations are rarely completed as they are resource intensive and often require unavailable data; some overcome these difficulties by performing stochastic modelling and by using secondary sources. Low methodological transparency can be a problem for building evidence from available economic evaluations. Investing in the economic design and reporting of studies with more emphasis on defining study perspectives, data collection and methodological choices could be helpful for strengthening our knowledge base on practices for improving patient safety.

  15. Preliminary Analysis of a Steam Line Break Accident with the MARS-KS code for the SMART Design with Passive Safety Systems

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Doohyuk; Ko, Yungjoo; Suh, Jaeseung [Hannam Univ., Daejeon (Korea, Republic of); Bae, Hwang; Ryu, Sunguk; Yi, Sungjae; Park, Hyunsik [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    SMART has been developed by KAERI, and SMART-Standard Design Approval (SDA) was recently granted in 2012. A SMART design with Passive Safety System (PSS) features (called SMART-PSS) is being developed and added to the standard design of SMART by KAERI to improve its safety system. Active safety systems such as safety injection pumps will be replaced by a passive safety system, which is actuated only by the gravity force caused by the height difference. All tanks for the passive safety systems are higher than the injection nozzle, which is located around the reactor coolant pumps (RCPs). In this study, a preliminary analysis of the main steam line break accident (MSLB) was performed using the MARS-KS code to understand the general behavior of the SMART-PSS design and to prepare its validation test with the SMART-ITL (FESTA) facility. An anticipated accident for the main steam line break (MSLB) was performed using the MARS-KS code to understand the thermal-hydraulic behaviors of the SMART-PSS design. The preliminary analysis provides good insight into the passive safety system design features of the SMART-PSS and the thermal-hydraulic characteristics of the SMART design. The analysis results of the MSLB showed that the core water collapsed level inside the core support barrel was maintained high over the active core top level during the transient period. Therefore, the SMART-PSS design has satisfied the requirements to maintain the plant at a safe shutdown condition during 72 hours without AC power or operator action after an anticipated accident.

  16. 78 FR 25476 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2013-05-01

    ... Safety Officer Medal of Valor Review Board AGENCY: Bureau of Justice Assistance (BJA), Department of...) of the Public Safety Officer Medal of Valor Review Board to consider a range of issues of [email protected] . SUPPLEMENTARY INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out...

  17. 77 FR 26790 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2012-05-07

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Bureau of Justice... meeting (via conference call-in) of the Public Safety Officer Medal of Valor Review Board (``Board'') to... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions...

  18. SRTC criticality safety technical review: Nuclear Criticality Safety Evaluation 93-04 enriched uranium receipt

    International Nuclear Information System (INIS)

    Rathbun, R.

    1993-01-01

    Review of NMP-NCS-930087, open-quotes Nuclear Criticality Safety Evaluation 93-04 Enriched Uranium Receipt (U), July 30, 1993, close quotes was requested of SRTC (Savannah River Technology Center) Applied Physics Group. The NCSE is a criticality assessment to determine the mass limit for Engineered Low Level Trench (ELLT) waste uranium burial. The intent is to bury uranium in pits that would be separated by a specified amount of undisturbed soil. The scope of the technical review, documented in this report, consisted of (1) an independent check of the methods and models employed, (2) independent HRXN/KENO-V.a calculations of alternate configurations, (3) application of ANSI/ANS 8.1, and (4) verification of WSRC Nuclear Criticality Safety Manual procedures. The NCSE under review concludes that a 500 gram limit per burial position is acceptable to ensure the burial site remains in a critically safe configuration for all normal and single credible abnormal conditions. This reviewer agrees with that conclusion

  19. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    International Nuclear Information System (INIS)

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs

  20. Nuclear Fuel Safety Criteria Technical Review - Second edition

    International Nuclear Information System (INIS)

    Beck, Winfried; Blanpain, Patrick; Fuketa, Toyoshi; Gorzel, Andreas; Hozer, Zoltan; Kamimura, Katsuichiro; Koo, Yang-Hyun; Maertens, Dietmar; Nechaeva, Olga; Petit, Marc; Rehacek, Radomir; Rey-Gayo, Jose Maria; Sairanen, Risto; Sonnenburg, Heinz-Guenther; Valach, Mojmir; Waeckel, Nicolas; Yueh, Ken; Zhang, Jinzhao; Voglewede, John

    2012-01-01

    Most of the current nuclear fuel safety criteria were established during the 1960's and early 1970's. Although these criteria were validated against experiments with fuel designs available at that time, a number of tests were based on unirradiated fuels. Additional verification was performed as these designs evolved, but mostly with the aim of showing that the new designs adequately complied with existing criteria, and not to establish new limits. In 1996, the OECD Nuclear Energy Agency (NEA) reviewed existing fuel safety criteria, focusing on new fuel and core designs, new cladding materials and industry manufacturing processes. The results were published in the Nuclear Fuel Safety Criteria Technical Review of 2001. The NEA has since re-examined the criteria. A brief description of each criterion and its rationale are presented in this second edition, which will be of interest to both regulators and industry (fuel vendors, utilities)

  1. Safety review on unit testing of safety system software of nuclear power plant

    International Nuclear Information System (INIS)

    Liu Le; Zhang Qi

    2013-01-01

    Software unit testing has an important place in the testing of safety system software of nuclear power plants, and in the wider scope of the verification and validation. It is a comprehensive, systematic process, and its documentation shall meet the related requirements. When reviewing software unit testing, attention should be paid to the coverage of software safety requirements, the coverage of software internal structure, and the independence of the work. (authors)

  2. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    International Nuclear Information System (INIS)

    Sagar, Budhi; Egan, Michael; Roehlig, Klaus-Juergen; Chapman, Neil; Wilmot, Roger

    2008-03-01

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM review team requested that consideration be given

  3. Preliminary safety evaluation for the Laxemar subarea. Based on data and site descriptions after the initial site investigation stage

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden)

    2006-03-15

    The main objectives of this Preliminary Safety Evaluation (PSE) of the Laxemar subarea have been to determine, with limited efforts, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the actual site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site-specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB in 2000. These criteria both concern properties of the site judged to be necessary for safety and engineering (requirements) and properties judged to be beneficial (preferences). The findings are then evaluated in order to provide feedback to continued investigations and design work. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The latter is eventually done in coming Safety Assessments. This preliminary safety evaluation shows that, according to existing data, the Laxemar subarea meets all safety requirements. The evaluation also shows that the Laxemar subarea meets most of the safety preferences, but for some aspects of the site description further reduction of the uncertainties would enhance the safety case. Despite the stated concerns, there is no reason, from a safety point of view, not to continue the Site Investigations at the Laxemar subarea. There are uncertainties to resolve and the safety would eventually need to be verified through a proper safety assessment. Only some of the uncertainties noted in the Site Descriptive Model have safety implications and need further resolution for this reason. Furthermore, uncertainties may need resolving for other reasons, such as giving an adequate assurance of site understanding or assisting in optimising design. Notably, there are questions about the

  4. Preliminary safety evaluation for the Laxemar subarea. Based on data and site descriptions after the initial site investigation stage

    International Nuclear Information System (INIS)

    Andersson, Johan

    2006-03-01

    The main objectives of this Preliminary Safety Evaluation (PSE) of the Laxemar subarea have been to determine, with limited efforts, whether the feasibility study's judgement of the suitability of the candidate area with respect to long-term safety holds up in the light of the actual site investigation data; to provide feedback to continued site investigations and site-specific repository design and to identify site-specific scenarios and geoscientific issues for further analyses. The PSE focuses on comparing the attained knowledge of the sites with the suitability criteria as set out by SKB in 2000. These criteria both concern properties of the site judged to be necessary for safety and engineering (requirements) and properties judged to be beneficial (preferences). The findings are then evaluated in order to provide feedback to continued investigations and design work. The PSE does not aim at comparing sites and does not assess compliance with safety and radiation protection criteria. The latter is eventually done in coming Safety Assessments. This preliminary safety evaluation shows that, according to existing data, the Laxemar subarea meets all safety requirements. The evaluation also shows that the Laxemar subarea meets most of the safety preferences, but for some aspects of the site description further reduction of the uncertainties would enhance the safety case. Despite the stated concerns, there is no reason, from a safety point of view, not to continue the Site Investigations at the Laxemar subarea. There are uncertainties to resolve and the safety would eventually need to be verified through a proper safety assessment. Only some of the uncertainties noted in the Site Descriptive Model have safety implications and need further resolution for this reason. Furthermore, uncertainties may need resolving for other reasons, such as giving an adequate assurance of site understanding or assisting in optimising design. Notably, there are questions about the

  5. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  6. Safety review for human factors engineering and control rooms of nuclear power plants

    International Nuclear Information System (INIS)

    Yang Mengzhuo

    1998-01-01

    Safety review for human factors engineering and control rooms of nuclear power plants (NPP) is in a forward position of science and technology, which began at American TMI severe accident and had been implemented in China. The importance and the significance of the safety review are expounded, the requirements of its scope and profundity are explained in detail. In addition, the situation of the technical document system for nuclear safety regulation on human factors engineering and control rooms of NPP in China is introduced briefly, on which the safety review is based

  7. Human Resources Readiness as TSO for Deterministic Safety Analysis on the First NPP in Indonesia

    International Nuclear Information System (INIS)

    Sony Tjahyani, D. T.

    2010-01-01

    In government regulation no. 43 year 2006 it is mentioned that preliminary safety analysis report and final safety analysis report are one of requirements which should be applied in construction and operation licensing for commercial power reactor (NPPs). The purpose of safety analysis report is to confirm the adequacy and efficiency of provisions within the defence in depth of nuclear reactor. Deterministic analysis is used on the safety analysis report. One of the TSO task is to evaluate this report based on request of operator or regulatory body. This paper discusses about human resources readiness as TSO for deterministic safety analysis on the first NPP in Indonesia. The assessment is done by comparing the analysis step on SS-23 and SS-30 with human resources status of BATAN currently. The assessment results showed that human resources for deterministic safety analysis are ready as TSO especially to review preliminary safety analysis report and to revise final safety analysis report in licensing on the first NPP in Indonesia. Otherwise, to prepare the safety analysis report is still needed many competency human resources. (author)

  8. The periodic safety review of nuclear power plants. Practices in OECD countries

    International Nuclear Information System (INIS)

    1992-01-01

    This report gives an overview of the regulatory concepts and practices for the periodic safety review of nuclear power plants in OECD countries with nuclear power programmes. The statutory bases for such reviews, their objectives and the processes adopted are summarised against the background of each country's regulatory practices. Although periodic safety reviews are now, or will soon be, part of the regulatory process in the majority of countries, the national approaches to these reviews still differ considerably. This report includes numerous examples of the different concepts and practices in OECD countries, thereby illustrating the variety of ways adopted to reach the common goal of maintaining and improving nuclear safety

  9. Updated safety analysis of ITER

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Neill, E-mail: neill.taylor@iter.org [ITER Organization, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Baker, Dennis; Ciattaglia, Sergio; Cortes, Pierre; Elbez-Uzan, Joelle; Iseli, Markus; Reyes, Susana; Rodriguez-Rodrigo, Lina; Rosanvallon, Sandrine; Topilski, Leonid [ITER Organization, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2011-10-15

    An updated version of the ITER Preliminary Safety Report has been produced and submitted to the licensing authorities. It is revised and expanded in response to requests from the authorities after their review of an earlier version in 2008, to reflect enhancements in ITER safety provisions through design changes, to incorporate new and improved safety analyses and to take into account other ITER design evolution. The updated analyses show that changes to the Tokamak cooling water system design have enhanced confinement and reduced potential radiological releases as well as removing decay heat with very high reliability. New and updated accident scenario analyses, together with fire and explosion risk analyses, have shown that design provisions are sufficient to minimize the likelihood of accidents and reduce potential consequences to a very low level. Taken together, the improvements provided a stronger demonstration of the very good safety performance of the ITER design.

  10. Updated safety analysis of ITER

    International Nuclear Information System (INIS)

    Taylor, Neill; Baker, Dennis; Ciattaglia, Sergio; Cortes, Pierre; Elbez-Uzan, Joelle; Iseli, Markus; Reyes, Susana; Rodriguez-Rodrigo, Lina; Rosanvallon, Sandrine; Topilski, Leonid

    2011-01-01

    An updated version of the ITER Preliminary Safety Report has been produced and submitted to the licensing authorities. It is revised and expanded in response to requests from the authorities after their review of an earlier version in 2008, to reflect enhancements in ITER safety provisions through design changes, to incorporate new and improved safety analyses and to take into account other ITER design evolution. The updated analyses show that changes to the Tokamak cooling water system design have enhanced confinement and reduced potential radiological releases as well as removing decay heat with very high reliability. New and updated accident scenario analyses, together with fire and explosion risk analyses, have shown that design provisions are sufficient to minimize the likelihood of accidents and reduce potential consequences to a very low level. Taken together, the improvements provided a stronger demonstration of the very good safety performance of the ITER design.

  11. 29 CFR 2200.108 - Official Seal of the Occupational Safety and Health Review Commission.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Official Seal of the Occupational Safety and Health Review... Occupational Safety and Health Review Commission. The seal of the Commission shall consist of: A gold eagle... background, encircled by a white band edged in black and inscribed “Occupational Safety and Health Review...

  12. IAEA Operational Safety Team Reviews Saint-Alban Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed safety practices at France's Saint-Alban Nuclear Power Plant (NPP) and has highlighted a set of strong practices as well as a series of recommendations to reinforce them. The IAEA assembled the team at the request of the Government of France to conduct an Operational Safety Review (OSART) of the Saint-Alban NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review from 20 September to 6 October 2010. The team was made up of experts from Belgium, Canada, the Czech Republic, Germany, Lithuania, the Netherlands, Slovakia, Sweden and the USA. An OSART mission is designed to review programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Saint-Alban conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely are under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: A safety guideline for outages; The use of remote video surveillance of fuel inspection and handling activities; A motivational tool for plant staff regarding the benefits of operating experience and associated corrective actions; and Use of a sophisticated key control system

  13. IAEA Operational Safety Team Review Bohunice Nuclear Power Plant, Slovak Republic

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has reviewed Slovakia's Bohunice Nuclear Power Plant (BNPP) for its safety practices and has noted a series of good practices as well as recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of Slovak Republic to conduct an Operational Safety Review (OSART) of Bohunice NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the OSART team performed an in-depth operational safety review from 1 to 18 November 2010. The team was made up of experts from Belgium, Canada, China, the Czech Republic, France, Sweden, the United Kingdom and the IAEA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at BNPP conducted an in-depth review of the aspects essential to the safe operation of the NPP, which largely is under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. Long Term Operation assessment has been requested by the plant in addition to the standard OSART program. The OSART team has identified good plant practices which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: BNPP has implemented a comprehensive set of technical and organizational measures which have significantly reduced the production of liquid radioactive waste; BNPP has developed an automatic transfer of dosimetry data

  14. Effect of electronic device use on pedestrian safety : a literature review.

    Science.gov (United States)

    2016-04-01

    This literature review on the effect of electronic device use on pedestrian safety is part of a research project sponsored by the Office of Behavioral Safety Research in the National Highway Traffic Safety Administration (NHTSA). An extensive literat...

  15. Preliminary systems-interaction results from the Digraph Matrix Analysis of the Watts Bar Nuclear Power Plant safety-injection systems

    International Nuclear Information System (INIS)

    Sacks, I.J.; Ashmore, B.C.; Champney, J.M.; Alesso, H.P.

    1983-06-01

    This report provides preliminary results generated by a Digraph Matrix Analysis (DMA) for a Systems Interaction analysis performed on the Safety Injection System of the Tennessee Valley Authority Watts Bar Nuclear Power Plant. An overview of DMA is provided along with a brief description of the computer codes used in DMA

  16. Reactor safety review of permanent changes

    International Nuclear Information System (INIS)

    Lam, K.F.

    1997-01-01

    Operational compliance engineers review all changes as part of a change control process. Each change, permanent or temporary, is required to undergo an intricate review process to ensure that the benefits associated with the change outweigh the risk. For permanent changes, it is necessary to ensure that the proposed design meets the nuclear safety requirements, conforms to the licensing requirements and complies with regulatory requirements. In addition, during installation of the permanent change and prior to in-service, a configuration management process is in place to align the change with operating and maintenance documents. (author)

  17. 78 FR 4383 - Stainless Steel Bar From Brazil: Preliminary Results of Antidumping Duty Administrative Review...

    Science.gov (United States)

    2013-01-22

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-351-825] Stainless Steel Bar From... steel bar (SSB) from Brazil. The period of review (POR) is February 1, 2011, through January 31, 2012... Review: Stainless Steel Bar from Brazil'' dated concurrently with this notice (``Preliminary Decision...

  18. 78 FR 7395 - Stainless Steel Bar From India: Preliminary Results of Antidumping Duty Administrative Review...

    Science.gov (United States)

    2013-02-01

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-533-810] Stainless Steel Bar From... steel bar (SSB) from India. The period of review (POR) is February 1, 2011, through January 31, 2012... Preliminary Results of Antidumping Duty Administrative Review: Stainless Steel Bar from India'' dated...

  19. Nuclear Safety: Volume 29, No. 3: Technical progress review

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E G [ed.

    1988-07-01

    Nuclear Safety is a review journal that covers significant development in the field of nuclear safety. Its scope included the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Individual papers have been cataloged separately.

  20. Obtaining Valid Safety Data for Software Safety Measurement and Process Improvement

    Science.gov (United States)

    Basili, Victor r.; Zelkowitz, Marvin V.; Layman, Lucas; Dangle, Kathleen; Diep, Madeline

    2010-01-01

    We report on a preliminary case study to examine software safety risk in the early design phase of the NASA Constellation spaceflight program. Our goal is to provide NASA quality assurance managers with information regarding the ongoing state of software safety across the program. We examined 154 hazard reports created during the preliminary design phase of three major flight hardware systems within the Constellation program. Our purpose was two-fold: 1) to quantify the relative importance of software with respect to system safety; and 2) to identify potential risks due to incorrect application of the safety process, deficiencies in the safety process, or the lack of a defined process. One early outcome of this work was to show that there are structural deficiencies in collecting valid safety data that make software safety different from hardware safety. In our conclusions we present some of these deficiencies.

  1. Performance assessment review for DOE LLW disposal facilities

    International Nuclear Information System (INIS)

    Wilhite, Elmer L.

    1992-01-01

    The United States Department of Energy (US DOE) disposes of low-level radioactive waste in near-surface disposal facilities. Safety of the disposal operations is evaluated for operational safety as well as long-term safety. Operational safety is evaluated based on the perceived level of hazard of the operation and may vary from a simple safety assessment to a safety analysis report. Long-term safety of all low-level waste disposal systems is evaluated through the conduct of a radiological performance assessment. The US DOE has established radiological performance objectives for disposal of low-level waste. They are to protect a member of the general public from receiving over 25 mrem/y, and an inadvertent intruder into the waste from receiving over 100 mrem/y continuous exposure or 500 mrem from a single exposure. For a disposal system to be acceptable, a performance assessment must be prepared which must be technically accurate and provide reasonable assurance that these performance objectives are met. Technical quality of the performance assessments is reviewed by a panel of experts. The panel of experts is used in two ways to assure the technical quality of performance assessment. A preliminary (generally 2 day) review by the panel is employed in the late stages of development to provide guidance on finalizing the performance assessment. The comments from this review are communicated to the personnel responsible for the performance assessment for consideration and incorporation. After finalizing the performance assessment, it is submitted for a formal review. The formal review is accomplished by a much more thorough analysis of the performance assessment over a multi-week time period. The panel then formally reports their recommendations to the US DOE waste management senior staff who make the final determination on acceptability of the performance assessment. A number of lessons have been learned from conducting several preliminary reviews of performance

  2. Preliminary safety evaluation for the plutonium stabilization and packaging system

    International Nuclear Information System (INIS)

    Shapley, J.E.

    1997-01-01

    This Preliminary Safety Evaluation (PSE) describes and analyzes the installation and operation of the Plutonium Stabilization and Packaging System (SPS) at the Plutonium Finishing Plant (PFP). The SPS is a combination of components required to expedite the safe and timely storage of Plutonium (Pu) oxide. The SPS program will receive site Pu packages, process the Pu for storage, package the Pu into metallic containers, and safely store the containers in a specially modified storage vault. The location of the SPS will be in the 2736- ZB building and the storage vaults will be in the 2736-Z building of the PFP, as shown in Figure 1-1. The SPS will produce storage canisters that are larger than those currently used for Pu storage at the PFP. Therefore, the existing storage areas within the PFP secure vaults will require modification. Other modifications will be performed on the 2736-ZB building complex to facilitate the installation and operation of the SPS

  3. SCART guidelines. Reference report for IAEA Safety Culture Assessment Review Team (SCART)

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA Director General stressed the role of safety culture in his concluding remarks at the Meeting of the Contracting Parties to the Convention on Nuclear Safety in 2002: 'As we have learned in other areas, it is not enough simply to have a structure; it is not enough to say that we have the necessary laws and the appropriate regulatory bodies. All these are important, but equally important is that we have in place a safety culture that gives effect to the structure that we have developed. To me, effectiveness and transparency are keys. So, it is an issue which I am pleased to see, you are giving the attention it deserves and we will continue to work with you in clarifying, developing and applying safety culture through our programmes and through our technical cooperation activities.' The concept of safety culture was initially developed by the International Nuclear Safety Advisory Group (INSAG) after the Chernobyl accident in 1986. Since then the IAEA's perspective of safety culture has expanded with time as its recognition of the complexities of the concept developed. Safety culture is considered to be specific organizational culture in all types of organizations with activities that give rise to radiation risks. The aim is to make safety culture strong and sustainable, so that safety becomes a primary focus for all activities in such organizations, even for those, which might not look safety-related at first. SCART (Safety Culture Assessment Review Team) is a safety review service, which reflects the expressed interest of Members States for methods and tools for safety culture assessment. It is a replacement for the earlier service ASCOT (Assessment of Safety Culture in Organizations Team). The IAEA Safety Fundamentals, Requirements and Guides (Safety Standards) are the basis for the SCART Safety Review Service. The reports of INSAG, identifying important current nuclear safety issues, serve also as references during a SCART mission. SCART missions are based

  4. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  5. Russian Minatom nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    Royen, J.

    1999-01-01

    An NEA study on safety research needs of Russian-designed reactors, carried out in 1996, strongly recommended that a strategic plan for safety research be developed with respect to Russian nuclear power plants. Such a plan was developed at the Russian International Nuclear Safety Centre (RINSC) of the Russian Ministry of Atomic Energy (Minatom). The Strategic Plan is designed to address high-priority safety-research needs, through a combination of domestic research, the application of appropriate foreign knowledge, and collaboration. It represents major progress toward developing a comprehensive and coherent safety-research programme for Russian nuclear power plants (NPPs). The NEA undertook its review of the Strategic Plan with the objective of providing independent verification on the scope, priority, and content of the research described in the Plan based upon the experience of the international group of experts. The principal conclusions of the review and the general comments of the NEA group are presented. (K.A.)

  6. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    International Nuclear Information System (INIS)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations

  7. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    Energy Technology Data Exchange (ETDEWEB)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations. (DLC)

  8. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review.

    Science.gov (United States)

    Hall, Louise H; Johnson, Judith; Watt, Ian; Tsipa, Anastasia; O'Connor, Daryl B

    2016-01-01

    To determine whether there is an association between healthcare professionals' wellbeing and burnout, with patient safety. Systematic research review. PsychInfo (1806 to July 2015), Medline (1946 to July 2015), Embase (1947 to July 2015) and Scopus (1823 to July 2015) were searched, along with reference lists of eligible articles. Quantitative, empirical studies that included i) either a measure of wellbeing or burnout, and ii) patient safety, in healthcare staff populations. Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all) subscales of the burnout measures employed, and patient safety. Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed. This review illustrates the need for healthcare organisations to consider improving employees' mental health as well as creating safer work environments when planning interventions to improve patient safety. PROSPERO registration number: CRD42015023340.

  9. HTR-PM Safety requirement and Licensing experience

    International Nuclear Information System (INIS)

    Li Fu; Zhang Zuoyi; Dong Yujie; Wu Zongxin; Sun Yuliang

    2014-01-01

    HTR-PM is a 200MWe modular pebble bed high temperature reactor demonstration plant which is being built in Shidao Bay, Weihai, Shandong, China. The main design parameters of HTR-PM were fixed in 2006, the basic design was completed in 2008. The review of Preliminary Safety Analysis Report (PSAR) of HTR-PM was started in April 2008, completed in September 2009. In general, HTR- PM design complies with the current safety requirement for nuclear power plant in China, no special standards are developed for modular HTR. Anyway, Chinese Nuclear Safety Authority, together with the designers, developed some dedicated design criteria for key systems and components and published the guideline for the review of safety analysis report of HTR-PM, based on the experiences from licensing of HTR-10 and new development of nuclear safety. The probabilistic safety goal for HTR-PM was also defined by the safety authority. The review of HTR-PM PSAR lasted for one and a half years, with 3 dialogues meetings and 8 topics meetings, with more than 2000 worksheets and answer sheets. The heavily discussed topics during the PSAR review process included: the requirement for the sub-atmospheric ventilation system, the utilization of PSA in design process, the scope of beyond design basis accidents, the requirement for the qualification of TRISO coating particle fuel, and etc. Because of the characteristics of first of a kind for the demonstration plant, the safety authority emphasized the requirement for the experiment and validation, the PSAR was licensed with certain licensing conditions. The whole licensing process was under control, and was re-evaluated again after Fukushima accident to be shown that the design of HTR-PM complies with current safety requirement. This is a good example for how to license a new reactor. (author)

  10. Preliminary Safety Design Report for Remote Handled Low-Level Waste Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Solack; Carol Mason

    2012-03-01

    A new onsite, remote-handled low-level waste disposal facility has been identified as the highest ranked alternative for providing continued, uninterrupted remote-handled low-level waste disposal for remote-handled low-level waste from the Idaho National Laboratory and for nuclear fuel processing activities at the Naval Reactors Facility. Historically, this type of waste has been disposed of at the Radioactive Waste Management Complex. Disposal of remote-handled low-level waste in concrete disposal vaults at the Radioactive Waste Management Complex will continue until the facility is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). This preliminary safety design report supports the design of a proposed onsite remote-handled low-level waste disposal facility by providing an initial nuclear facility hazard categorization, by discussing site characteristics that impact accident analysis, by providing the facility and process information necessary to support the hazard analysis, by identifying and evaluating potential hazards for processes associated with onsite handling and disposal of remote-handled low-level waste, and by discussing the need for safety features that will become part of the facility design.

  11. Protective Alternatives of SMR against Extreme Threat Scenario – A Preliminary Risk Analysis

    International Nuclear Information System (INIS)

    Shohet, I.M.; Ornai, D.; Gal, E.; Ronen, Y.; Vidra, M.

    2014-01-01

    The article presents a preliminary risk analysis of the main features in NPP (Nuclear Power Plant) that includes SMR - Small and Modular Reactors, given an extreme threat scenario. A review of the structure and systems of the SMR is followed by systematic definitions and analysis of the threat scenario to which a preliminary risk analysis was carried out. The article outlines the basic events caused by the referred threat scenario, which had led to possible failure mechanisms according to FTA (Fault-Tree-Analysis),critical protective circuits, and todetecting critical topics for the protection and safety of the reactor

  12. Patient participation in patient safety and nursing input - a systematic review.

    Science.gov (United States)

    Vaismoradi, Mojtaba; Jordan, Sue; Kangasniemi, Mari

    2015-03-01

    This systematic review aims to synthesise the existing research on how patients participate in patient safety initiatives. Ambiguities remain about how patients participate in routine measures designed to promote patient safety. Systematic review using integrative methods. Electronic databases were searched using keywords describing patient involvement, nursing input and patient safety initiatives to retrieve empirical research published between 2007 and 2013. Findings were synthesized using the theoretical domains of Vincent's framework for analysing risk and safety in clinical practice: "patient", "healthcare provider", "task", "work environment", "organisation & management". We identified 17 empirical research papers: four qualitative, one mixed-method and 12 quantitative designs. All 17 papers indicated that patients can participate in safety initiatives. Improving patient participation in patient safety necessitates considering the patient as a person, the nurse as healthcare provider, the task of participation and the clinical environment. Patients' knowledge, health conditions, beliefs and experiences influence their decisions to engage in patient safety initiatives. An important component of the management of long-term conditions is to ensure that patients have sufficient knowledge to participate. Healthcare providers may need further professional development in patient education and patient care management to promote patient involvement in patient safety, and ensure that patients understand that they are 'allowed' to inform nurses of adverse events or errors. A healthcare system characterised by patient-centredness and mutual acknowledgement will support patient participation in safety practices. Further research is required to improve international knowledge of patient participation in patient safety in different disciplines, contexts and cultures. Patients have a significant role to play in enhancing their own safety while receiving hospital care. This

  13. A LITERATURE REVIEW ON GLOBAL OCCUPATIONAL SAFETY AND HEALTH PRACTICE & ACCIDENTS SEVERITY

    Directory of Open Access Journals (Sweden)

    Kassu Jilcha

    2016-06-01

    Full Text Available This literature review focuses on researches undertaken since 1980s onwards. The purpose of the study is to identify existing gaps on workplace safety and health management and propose future research areas. The review adds value to existing electronic database through integration of researches' results. To identify existing gaps, a systematic literature review approach has been used. The reviews were undertaken through keywords and safety related topics. In the literature, various characteristics of workplace safety and health problems were found emanating from the lack of operational activities of the employees, internal working environment and external environment those impose hazards on employee temporarily, permanently and on working environments. The integration of multidisciplinary approaches and collaborative model of hub and peripheral industries to protect workplace safety hazards to develop multilevel model has been undermined in many researches. The other face of finding is that knowledge transfer mechanism and industrial topology factors are left. Some researches finding showed that they have focused on single problems related to health and health factors leaving universal improving workplace safety. In general, this literature reviews compare various studies output based on their research method and findings to fills gap and add value to a body of knowledge.

  14. Second review meeting of the Contracting Parties to the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    Rafferty, Barbara

    2002-01-01

    The Second Review Meeting of the Contracting Parties to the Convention on Nuclear Safety was held in the Headquarters of the International Atomic Energy Agency in Vienna from 15-26 April 2002, under the chairmanship of the President, Mr Miroslav Gregoric, Director of the Slovenian Nuclear Safety Authority. The Convention on Nuclear Safety entered into force in October 1996, has been signed by sixty-five States and ratified by fifty-four, bringing within its scope 428 of the 448 nuclear reactors worldwide. The Convention aims to achieve and maintain a high level of nuclear safety worldwide, through inter alia enhancement of national measures and international co-operation. Obligations on Contracting Parties in accordance with the Convention include: the establishment and maintenance of a legislative and regulatory framework to govern the safety of land-based civil nuclear installations; the allocation of adequate financial and human resources to support the safety objectives; ensuring that all reasonably practicable improvements to safety are made as a matter of urgency. Adherence to this Convention entails two basic commitments by each Contracting Party: to prepare and make available a national report for review; and to subject its national report to a peer review by the other Contracting Parties. Thus, being a Contracting Party to this Convention involves: including in the national report a self-assessment of steps and measures already taken and in progress to implement the Convention obligations; taking an active part in an open and transparent review of its national report and the Reports of other Contracting Parties; and a commitment to a continuous learning and improving process, something which is a key element of a strong safety culture. The peer review of national reports takes place every three years, the first having been held in 1999. The Second Review Meeting was attended by delegates from 46 contracting parties. During the review certain issues were

  15. Periodic safety review of operational nuclear power plants. A publication within the NUSS programme

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide which supplements the IAEA Safety Fundamentals: The Safety of Nuclear Installations and the Code on the Safety of Nuclear Power Plants: Operation, forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes and Guides relating to nuclear power plants. A list of NUSS publications is given at the end of this book. This Guide was drafted on the basis of a systematic review approach that was endorsed by the IAEA Conference on the Safety of Nuclear Power: Strategy for the Future. The purpose of this Safety Guide is to provide guidance on the conduct of Periodic Safety Reviews (PSRs) for an operational nuclear power plant. The Guide is directed at both owners/operators and regulators. This Safety Guide deals with the PSR of an operational nuclear power plant. A PSR is a comprehensive safety review addressing all important aspects of safety, carried out at regular intervals. 22 refs, 4 figs

  16. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  17. A review of the nuclear safety activities in Italy

    International Nuclear Information System (INIS)

    Merelli, A.

    1989-01-01

    A review of research programs carried out in Italy in the field of nuclear reactor safety was done in 1986, in the frame of the activities of the Commission of the European Communities, the International Energy Agency and the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The report contains information on these programs, as well as information on the organization of safety research in Italy and the evolution of safety research programs

  18. Packaging Review Guide for Reviewing Safety Analysis Reports for Packagings

    Energy Technology Data Exchange (ETDEWEB)

    DiSabatino, A; Biswas, D; DeMicco, M; Fisher, L E; Hafner, R; Haslam, J; Mok, G; Patel, C; Russell, E

    2007-04-12

    This Packaging Review Guide (PRG) provides guidance for Department of Energy (DOE) review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE Order 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his or her review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. This PRG is generally organized at the section level in a format similar to that recommended in Regulatory Guide 7.9 (RG 7.9). One notable exception is the addition of Section 9 (Quality Assurance), which is not included as a separate chapter in RG 7.9. Within each section, this PRG addresses the technical and regulatory bases for the review, the manner in which the review is accomplished, and findings that are generally applicable for a package that meets the approval standards. This Packaging Review Guide (PRG) provides guidance for DOE review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE O 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. The primary objectives of this PRG are to: (1) Summarize the regulatory requirements for package approval; (2) Describe the technical review procedures by which DOE determines that these requirements have been satisfied; (3) Establish and maintain the quality and uniformity of reviews; (4) Define the base from which to evaluate proposed changes in scope

  19. Healthcare Staff Wellbeing, Burnout, and Patient Safety: A Systematic Review.

    Directory of Open Access Journals (Sweden)

    Louise H Hall

    Full Text Available To determine whether there is an association between healthcare professionals' wellbeing and burnout, with patient safety.Systematic research review.PsychInfo (1806 to July 2015, Medline (1946 to July 2015, Embase (1947 to July 2015 and Scopus (1823 to July 2015 were searched, along with reference lists of eligible articles.Quantitative, empirical studies that included i either a measure of wellbeing or burnout, and ii patient safety, in healthcare staff populations.Forty-six studies were identified. Sixteen out of the 27 studies that measured wellbeing found a significant correlation between poor wellbeing and worse patient safety, with six additional studies finding an association with some but not all scales used, and one study finding a significant association but in the opposite direction to the majority of studies. Twenty-one out of the 30 studies that measured burnout found a significant association between burnout and patient safety, whilst a further four studies found an association between one or more (but not all subscales of the burnout measures employed, and patient safety.Poor wellbeing and moderate to high levels of burnout are associated, in the majority of studies reviewed, with poor patient safety outcomes such as medical errors, however the lack of prospective studies reduces the ability to determine causality. Further prospective studies, research in primary care, conducted within the UK, and a clearer definition of healthcare staff wellbeing are needed.This review illustrates the need for healthcare organisations to consider improving employees' mental health as well as creating safer work environments when planning interventions to improve patient safety.PROSPERO registration number: CRD42015023340.

  20. Feasibility, safety, acceptability, and preliminary efficacy of measurement-based care depression treatment for HIV patients in Bamenda, Cameroon.

    Science.gov (United States)

    Pence, Brian W; Gaynes, Bradley N; Atashili, Julius; O'Donnell, Julie K; Kats, Dmitry; Whetten, Kathryn; Njamnshi, Alfred K; Mbu, Tabenyang; Kefie, Charles; Asanji, Shantal; Ndumbe, Peter

    2014-06-01

    Depression affects 18-30 % of HIV-infected patients in Africa and is associated with greater stigma, lower antiretroviral adherence, and faster disease progression. However, the region's health system capacity to effectively identify and treat depression is limited. Task-shifting models may help address this large mental health treatment gap. Measurement-Based Care (MBC) is a task-shifting model in which a Depression Care Manager guides a non-psychiatric (e.g., HIV) provider in prescribing and managing antidepressant treatment. We adapted MBC for depressed HIV-infected patients in Cameroon and completed a pilot study to assess feasibility, safety, acceptability, and preliminary efficacy. We enrolled 55 participants; all started amitriptyline 25-50 mg daily at baseline. By 12 weeks, most remained at 50 mg daily (range 25-125 mg). Median (interquartile range) PHQ-9 depressive severity scores declined from 13 (12-16) (baseline) to 2 (0-3) (week 12); 87 % achieved depression remission (PHQ-9 feasibility, safety, acceptability, and preliminary efficacy in this uncontrolled pilot study. Further research should assess whether MBC could improve adherence and HIV outcomes in this setting.

  1. Comprehensive review of the maritime safety regimes.

    NARCIS (Netherlands)

    S. Knapp (Sabine); Ph.H.B.F. Franses (Philip Hans)

    2007-01-01

    textabstractThis report presents a comprehensive review of the maritime safety regimes and provides recommendations on how to improve the system. The results show a complex legal framework which generates a high amount of inspections and overlapping of inspection areas where no cross-recognition is

  2. Development of safety analysis technology for integral reactor

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Suk K.; Song, J. H.; Chung, Y. J. and others

    1999-03-01

    Inherent safety features and safety system characteristics of the SMART integral reactor are investigated in this study. Performance and safety of the SMART conceptual design have been evaluated and confirmed through the performance and safety analyses using safety analysis system codes as well as a preliminary performance and safety analysis methodology. SMART design base events and their acceptance criteria are identified to develop a preliminary PIRT for the SMART integral reactor. Using the preliminary PIRT, a set of experimental program for the thermal hydraulic separate effect tests and the integral effect tests was developed for the thermal hydraulic model development and the system code validation. Safety characteristics as well as the safety issues of the integral reactor has been identified during the study, which will be used to resolve the safety issues and guide the regulatory criteria for the integral reactor. The results of the performance and safety analyses performed during the study were used to feedback for the SMART conceptual design. The performance and safety analysis code systems as well as the preliminary safety analysis methodology developed in this study will be validated as the SMART design evolves. The performance and safety analysis technology developed during the study will be utilized for the SMART basic design development. (author)

  3. SRTC criticality safety technical review of SRT-CMA-930039

    International Nuclear Information System (INIS)

    Rathbun, R.

    1993-01-01

    Review of SRT-CMA-930039, ''Nuclear Criticality Safety Evaluation (NCSE): DWPF Melter-Batch 1,'' December 1, 1993, has been performed by the Savannah River Technical Center (SRTC) Applied Physics Group. The NCSE is a criticality assessment of the Melt Cell in the DWPF. Additionally, this pertains only to Batch 1 operation, which differs from batches to follow. Plans for subsequent batch operations call for fissile material in the Salt Cell feed-stream, which necessitates a separate criticality evaluation in the future. The NCSE under review concludes that the process is safe from criticality events, even in the event that all lithium and boron neutron poisons are lost, provided uranium enrichments are less than 40%. Furthermore, if all the lithium and as much as 98% of the boron would be lost, uranium enrichments of 100% would be allowable. After a thorough review of the NCSE, this reviewer agrees with that conclusion. This technical review consisted of: an independent check of the methods and models employed, independent calculations application of ANSI/ANS 8.1, verification of WSRC Nuclear Criticality Safety Manual( 2 ) procedures

  4. Plant safety review from mass criticality accident

    International Nuclear Information System (INIS)

    Susanto, B.G.

    2000-01-01

    The review has been done to understand the resent status of the plant in facing postulated mass criticality accident. From the design concept of the plant all the components in the system including functional groups have been designed based on favorable mass/geometry safety principle. The criticality safety for each component is guaranteed because all the dimensions relevant to criticality of the components are smaller than dimensions of 'favorable mass/geometry'. The procedures covering all aspects affecting quality including the safety related are developed and adhered to at all times. Staff are indoctrinated periodically in short training session to warn the important of the safety in process of production. The plant is fully equipped with 6 (six) criticality detectors in strategic places to alert employees whenever the postulated mass criticality accident occur. In the event of Nuclear Emergency Preparedness, PT BATAN TEKNOLOGI has also proposed the organization structure how promptly to report the crisis to Nuclear Energy Control Board (BAPETEN) Indonesia. (author)

  5. Tank waste remediation system nuclear criticality safety program management review

    International Nuclear Information System (INIS)

    BRADY RAAP, M.C.

    1999-01-01

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999

  6. A Review of General Aviation Safety (1984-2017).

    Science.gov (United States)

    Boyd, Douglas D

    2017-07-01

    General aviation includes all civilian aviation apart from operations involving paid passenger transport. Unfortunately, this category of aviation holds a lackluster safety record, accounting for 94% of civil aviation fatalities. In 2014, of 1143 general aviation accidents, 20% were fatal compared with 0 of 29 airline mishaps in the United States. Herein, research findings over the past 30 yr will be reviewed. Accident risk factors (e.g., adverse weather, geographical region, post-impact fire, gender differences) will be discussed. The review will also summarize the development and implementation of stringent crashworthiness designs with multi-axis dynamic testing and head-injury protection and its impact on mitigating occupant injury severity. The benefits and drawbacks of new technology and human factor considerations associated with increased general aviation automation will be debated. Data on the safety of the aging general aviation population and increased drug usage will also be described. Finally, areas in which general aviation occupant survival could be improved and injury severity mitigated will be discussed with the view of equipping aircraft with 1) crash-resistant fuel tanks to reduce post-impact conflagration; 2) after-market ballistic parachutes for older aircraft; and 3) current generation electronic locator beacons to hasten site access by first responders.Boyd DD. A review of general aviation safety (1984-2017). Aerosp Med Hum Perform. 2017; 88(7):657-664.

  7. International experts conclude IAEA peer review of Iran's safety regulation of Bushehr NPP

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of nuclear safety experts today completed an IAEA mission to review the effectiveness of Iran's safety regulation of its first nuclear power plant and to identify possible improvements before the plant begins operation. Upon invitation of the Islamic Republic of Iran, the International Atomic Energy Agency (IAEA) assembled a team of senior regulators from seven Member States for an Integrated Regulatory Review Service (IRRS) mission. The scope of the mission was limited to the safety regulation of Bushehr nuclear power plant (BNPP-1). The IRRS review took place from 20 February to 2 March at the INRA offices in Tehran and included a technical visit to the BNPP-1 site. The mission was an objective peer review based on IAEA safety standards, and was neither an inspection, nor an audit. Ms. Olena Mykolaichuk, IRRS Team Leader and Head of the State Nuclear Regulatory Committee of Ukraine, commended her INRA counterparts: 'The regulatory work performed on the Bushehr construction and in preparation for commissioning has demonstrated significant progress of INRA as a nuclear regulatory authority,' she said. Philippe Jamet, Director of the IAEA's Nuclear Installation Safety Division, added: 'Through this IRRS mission, both Iran and the international experts contribute to the enhancement of nuclear safety and worldwide experience sharing.' In the course of its review the IRRS team identified the following strengths: - INRA has a dedicated, conscientious staff, demonstrating clear commitments to further improvements. - INRA clearly recognizes the value of peer reviews and international cooperation regarding nuclear safety. - Despite a shortage of staff, INRA demonstrated strong leadership while performing both review and assessment and inspection tasks during the BNPP-1 construction and pre-commissioning. - INRA has developed an excellent computerized documentation control system. Recommendations and suggestions to improve INRA's regulatory

  8. OSART Guidelines. 2015 Edition. Reference Report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2016-01-01

    The IAEA works to provide a global nuclear safety and security framework for the protection of people and the environment from the effects of ionizing radiation, the minimization of the likelihood of accidents that could endanger life and property, and effective mitigation of the effects of any such events, should they occur. The strategic approach to achieving such a framework involves continual improvement in four areas: national and international safety infrastructures; the establishment and global acceptance of IAEA safety standards; an integrated approach to the provision for the application of the safety standards; and a global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. Conservative design, careful manufacture and sound construction are all prerequisites for the safe operation of nuclear power plants. However, the safety of the plant also depends ultimately on: sound management, policies, procedures, processes and practices; the capability and reliability of commissioning and operating personnel; comprehensive instructions; sound accident management and emergency preparedness; and adequate resources. Finally, a positive attitude and conscientiousness on the part of all staff in discharging their responsibilities is important to safety. The OSART programme is based on the safety standards applicable to nuclear power plants. IAEA safety standards reflect the consensus of Member States on nuclear safety matters. The reports of the International Nuclear Safety Group identify important current nuclear safety issues and also serve as references during an OSART review. The publication OSART Guidelines provides overall guidance on the conduct of OSART

  9. Review of actinide nitride properties with focus on safety aspects

    Energy Technology Data Exchange (ETDEWEB)

    Albiol, Thierry [CEA Cadarache, St Paul Lez Durance Cedex (France); Arai, Yasuo [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-12-01

    This report provides a review of the potential advantages of using actinide nitrides as fuels and/or targets for nuclear waste transmutation. Then a summary of available properties of actinide nitrides is given. Results from irradiation experiments are reviewed and safety relevant aspects of nitride fuels are discussed, including design basis accidents (transients) and severe (core disruptive) accidents. Anyway, as rather few safety studies are currently available and as many basic physical data are still missing for some actinide nitrides, complementary studies are proposed. (author)

  10. Buffer erosion: An overview of concepts and potential safety consequences

    International Nuclear Information System (INIS)

    Apted, Michael J.; Arthur, Randy; Bennett, David; Savage, David; Saellfors, Goeran; Wennerstroem, Haakan

    2010-11-01

    In its safety analysis SR-Can, SKB reported preliminary results and conclusions on the mechanisms of bentonite colloid formation and stability, with a rough estimate of the consequences of loss of bentonite buffer by erosion. With the review of SR-Can the authorities (SKI and SSI) commented that erosion of the buffer had the greatest safety significance, that the understanding of the mechanisms of buffer erosion was inadequate, and that more work would be required to arrive at robust estimates of the extent and impacts of buffer erosion. After the SR-Can report, SKB started a two-year research project on buffer erosion. The results from this two-year project have been reported in several SKB technical reports. SSM started this project to build up its own competence in the related scientific areas by a preliminary evaluation of SKB's research results

  11. Buffer erosion: An overview of concepts and potential safety consequences

    Energy Technology Data Exchange (ETDEWEB)

    Apted, Michael J.; Arthur, Randy (INTERA Incorporated, Denver, CO (United States)); Bennett, David (TerraSalus Limited, Rutland (United Kingdom)); Savage, David (Savage Earth Associates Limited, Bournemouth (United Kingdom)); Saellfors, Goeran (GeoForce AB, Billdal (Sweden)); Wennerstroem, Haakan (Dept. of Chemistry, Lund Univ., Lund (Sweden))

    2010-11-15

    In its safety analysis SR-Can, SKB reported preliminary results and conclusions on the mechanisms of bentonite colloid formation and stability, with a rough estimate of the consequences of loss of bentonite buffer by erosion. With the review of SR-Can the authorities (SKI and SSI) commented that erosion of the buffer had the greatest safety significance, that the understanding of the mechanisms of buffer erosion was inadequate, and that more work would be required to arrive at robust estimates of the extent and impacts of buffer erosion. After the SR-Can report, SKB started a two-year research project on buffer erosion. The results from this two-year project have been reported in several SKB technical reports. SSM started this project to build up its own competence in the related scientific areas by a preliminary evaluation of SKB's research results

  12. Aviation and healthcare: a comparative review with implications for patient safety.

    Science.gov (United States)

    Kapur, Narinder; Parand, Anam; Soukup, Tayana; Reader, Tom; Sevdalis, Nick

    2016-01-01

    Safety in aviation has often been compared with safety in healthcare. Following a recent article in this journal, the UK government set up an Independent Patient Safety Investigation Service, to emulate a similar well-established body in aviation. On the basis of a detailed review of relevant publications that examine patient safety in the context of aviation practice, we have drawn up a table of comparative features and a conceptual framework for patient safety. Convergence and divergence of safety-related behaviours across aviation and healthcare were derived and documented. Key safety-related domains that emerged included Checklists, Training, Crew Resource Management, Sterile Cockpit, Investigation and Reporting of Incidents and Organisational Culture. We conclude that whilst healthcare has much to learn from aviation in certain key domains, the transfer of lessons from aviation to healthcare needs to be nuanced, with the specific characteristics and needs of healthcare borne in mind. On the basis of this review, it is recommended that healthcare should emulate aviation in its resourcing of staff who specialise in human factors and related psychological aspects of patient safety and staff wellbeing. Professional and post-qualification staff training could specifically include Cognitive Bias Avoidance Training, as this appears to play a key part in many errors relating to patient safety and staff wellbeing.

  13. Classification of antecedents towards safety use of health information technology: A systematic review.

    Science.gov (United States)

    Salahuddin, Lizawati; Ismail, Zuraini

    2015-11-01

    This paper provides a systematic review of safety use of health information technology (IT). The first objective is to identify the antecedents towards safety use of health IT by conducting systematic literature review (SLR). The second objective is to classify the identified antecedents based on the work system in Systems Engineering Initiative for Patient Safety (SEIPS) model and an extension of DeLone and McLean (D&M) information system (IS) success model. A systematic literature review (SLR) was conducted from peer-reviewed scholarly publications between January 2000 and July 2014. SLR was carried out and reported based on the preferred reporting items for systematic reviews and meta-analyses (PRISMA) statement. The related articles were identified by searching the articles published in Science Direct, Medline, EMBASE, and CINAHL databases. Data extracted from the resultant studies included are to be analysed based on the work system in Systems Engineering Initiative for Patient Safety (SEIPS) model, and also from the extended DeLone and McLean (D&M) information system (IS) success model. 55 articles delineated to be antecedents that influenced the safety use of health IT were included for review. Antecedents were identified and then classified into five key categories. The categories are (1) person, (2) technology, (3) tasks, (4) organization, and (5) environment. Specifically, person is attributed by competence while technology is associated to system quality, information quality, and service quality. Tasks are attributed by task-related stressor. Organisation is related to training, organisation resources, and teamwork. Lastly, environment is attributed by physical layout, and noise. This review provides evidence that the antecedents for safety use of health IT originated from both social and technical aspects. However, inappropriate health IT usage potentially increases the incidence of errors and produces new safety risks. The review cautions future

  14. 41 CFR 128-1.8009 - Review of Seismic Safety Program.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Review of Seismic Safety Program. 128-1.8009 Section 128-1.8009 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program...

  15. Preliminary Assessment of PHTS Pump Piping Break Accident of DSFR-600

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Andong; Bae, Moohoon; Choi, Yongwon; Suh, Namduk [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-05-15

    KINS is evaluating the applicability of TRACE code for safety analysis of SFR Since 2012. Based on the steady-state input deck for Demonstration Sodium Cooled Fast Reactor 600MW (DSFR-600) component-wise specific modeling is developed for DSFR-600. Preliminary analysis was performed with TRACE code for DSFR-600 PHTS pump piping break accident. The calculation result showed that the calculated safety parameters are conforms to the design criteria for DBA accidents. RHRS design of DSFR-600 and its performance during transient was also reviewed by sensitivity study on the effect of sodium condition to the transient decay heat removal capability of RHRS. Following insights are identified. These should be considered in improving the design also in licensing review of SFR safety analysis. The transient performance of RHRS might differ from the component's design capacity. RHRS's transient performance also should be included in the design documents and validated with reasonable test and/or analysis with consideration of the variation of coolant conditions during transient. The analytic model used for safety analysis should consider 3-D effect of vessel pool and its uncertainty with reasonable conservatism.

  16. Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Farren Hunt

    2012-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

  17. 75 FR 54915 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2010-09-09

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Justice. ACTION... Officer Medal of Valor Review Board to vote on recommendations for the 2009-2010 Medal of Valor... Public Safety Officer Medal of Valor Review Board carries out those advisory functions specified in 42 U...

  18. Overview of the periodic safety review of nuclear power plants as practised in India

    International Nuclear Information System (INIS)

    Jhamb, N.K.; Chande, S.K.

    1997-01-01

    In India, routine and periodic safety reviews of nuclear facilities are carried out through a multitiered hierarchy of committees at the plant level, the operating organization level and the regulatory body level. In 1993, it was decided by the Atomic Energy Regulatory Board (AERB, the regulatory body) that, as a policy, authorization for operation of nuclear power plants (NPPs) shall have a validity period of 5 years, after which this authorization will have to be renewed. NPPs have to carry out a self-assessment according to an established procedure, prepare a Safety Assessment Report for Renewal of Authorization (SARRA) and submit it to the AERB for review. The procedure defines the objectives of the report and gives guidelines on the required review of the self-assessment of the operational plant safety. The paper discusses the objectives, the elements of the SARRA review, the review process, the SARRA review carried out in 1993-1994, the basis for acceptability of continued plant operation, and the lessons learned for future periodic safety reviews in India and for exchange of operating experience feedback. (author)

  19. Safety overview of the National Ignition Facility

    International Nuclear Information System (INIS)

    Brereton, S.J.; McLouth, L.; Odell, B.; Singh, M.; Tobin, M.; Trent, M.

    1996-01-01

    The National Ignition Facility (NIF) is a proposed US Department of Energy inertial confinement laser fusion facility. The candidate sites for locating the NIF are: Los Alamos National Laboratory, Sandia National Laboratory, the Nevada Test Site, and Lawrence Livermore National Laboratory (LLNL), the preferred site. The NIF will operate by focusing 192 laser beams onto a tiny deuterium- tritium target located at the center of a spherical target chamber. The NIF mission is to achieve inertial confinement fusion (ICF) ignition, access physical conditions in matter of interest to nuclear weapons physics, provide an above ground simulation capability for nuclear weapons effects testing, and contribute to the development of inertial fusion for electrical power production. The NIF has been classified as a radiological, low hazard facility on the basis of a preliminary hazards analysis and according to the DOE methodology for facility classification. This requires that a safety analysis be prepared under DOE Order 5481.1B, Safety Analysis and Review System. A draft Preliminary Safety Analysis Report (PSAR) has been written, and this will be finalized later in 1996. This paper summarizes the safety issues associated with the operation of the NIF. It provides an overview of the hazards, estimates maximum routine and accidental exposures for the preferred site of LLNL, and concludes that the risks from NIF operations are low

  20. 76 FR 52945 - Chlorpyrifos Registration Review; Preliminary Human Health Risk Assessment; Extension of Comment...

    Science.gov (United States)

    2011-08-24

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2008-0850; FRL-8886-6] Chlorpyrifos Registration... chlorpyrifos registration review; preliminary human health risk assessment. This document extends the comment... . SUPPLEMENTARY INFORMATION: This document extends the public comment period for the chlorpyrifos reregistration...

  1. NPP Temelin safety analysis reports and PSA status

    International Nuclear Information System (INIS)

    Mlady, O.

    1999-01-01

    To enhance the safety level of Temelin NPP, recommendations of the international reviews were implemented into the design as well as into organization of the plant construction and preparation for operation. The safety assessment of these design changes has been integrated and reflected in the Safety Analysis Reports, which follow the internationally accepted guidelines. All safety analyses within Safety Analysis Reports were repeated carefully considering technical improvements and replacements to complement preliminary safety documentation. These analyses were performed by advanced western computer codes to the depth and in the structure required by western standards. The Temelin NPP followed a systematic approach in the functional design of the Reactor Protection System and related safety analyses. Modifications of reactor protection system increase defense in depth and facilitate demonstrating that LOCA and radiological limits are met for non-LOCA events. The rigorous safety analysis methodology provides assurance that LOCA and radiological limits are met. Established and accepted safety analysis methodology and accepted criteria were applied to Temelin NPP meeting US NRC and Czech Republic requirements. IAEA guidelines and recommendations

  2. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... publish a preliminary plan in the odd numbered years and a final plan in the even numbered years. The... necessary before concluding the review of the three remaining point source categories: Pulp, Paper and... standards for the 2012 reviews. These methodologies included: Identifying pass-through pollutants in sewage...

  3. Development and Validation of a Safety Attitude Scale for Coal Miners in China

    Directory of Open Access Journals (Sweden)

    Xiang Wu

    2017-11-01

    Full Text Available Safety attitude is of vital importance to accident prevention, and the high accident rate in the coal mining industry makes it urgent to undertake research on coal miners’ safety attitude. However, the current literature still lacks a valid and reliable safety attitude measurement scale for coal miners, which stands as a barrier against their safety attitude improvement. In this study, a scale is developed that can be used to measure coal miners’ safety attitude. The preliminary scale was based on an extended literature review. Empirical data were then collected from 725 coal miners using the preliminary scale. Both exploratory and confirmatory factor analyses were undertaken to validate and improve the scale. The final scale, which consists of 17 items, contains four dimensions: management safety commitment, team safety climate, fatalism and work pressure. Results show that this safety attitude scale can effectively measure the safety attitude of coal miners, showing high psychological measurement validity. This paper contributes to the occupational safety research by developing the factor structure and indicator system of coal miners’ safety attitude, thus providing more profound interpretation of this crucial construct in the safety research domain. The measurement scale serves as an important tool for safety attitude benchmarking among different coal mining enterprises and, thus, can boost the overall safety improvement of the whole industry. These findings can facilitate improvement of both theories and practices related to occupational safety attitude.

  4. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  5. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2005-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards; - Integrated approach to the provision for the application of safety standards; and - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices; on the capability and reliability of the commissioning and operating personnel; on comprehensive instructions; and on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  6. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2007-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  7. OSART guidelines - 2005 edition. Reference report for IAEA Operational Safety Review Teams (OSARTs)

    International Nuclear Information System (INIS)

    2008-01-01

    The International Atomic Energy Agency (IAEA) has put forward the vision of a global nuclear safety regime that provides for the protection of people and the environment from the effects of ionizing radiation from nuclear facilities, the minimization of the likelihood of accidents that could endanger life and property and effective mitigation of the effects of any such events should they occur. The strategic approach for achieving the vision of enhancing this regime involves four elements and aims at ensuring that the overall nuclear safety level in Member States continues to improve: - Improvement of national and international safety infrastructures: - Establishment and global acceptance of IAEA safety standards. - Integrated approach to the provision for the application of safety standards. And - Global network of knowledge and experience. The IAEA Operational Safety Review Team (OSART) programme provides advice and assistance to Member States to enhance the safety of nuclear power plants during commissioning and operation. The OSART programme, initiated in 1982, is available to all Member States with nuclear power plants under commissioning or in operation. The OSART methodology and its safety services may also be applied to other nuclear installations (e.g. fuel cycle facilities, research reactors). Conservative design, careful manufacture and sound construction are all prerequisites for safe operation of nuclear power plants. However, the safety of the plant depends ultimately on sound policies, procedures, processes and practices. On the capability and reliability of the commissioning and operating personnel. On comprehensive instructions. And on adequate resources. A positive attitude and conscientiousness on the part of the management and staff in discharging their responsibilities is important to safety. OSART missions consider these aspects in assessing a facility's operational practices in comparison with those used successfully in other countries and

  8. International Expert Review of Sr-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sagar, Budhi (Center for Nuclear Waste Regulatory Analyses, Southwest Research Inst., San Antonio, TX (US)); Egan, Michael (Quintessa Limited, Henley-on-Thames (GB)); Roehlig, Klaus-Juergen (Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (DE)); Chapman, Neil (Independent Consultant (XX)); Wilmot, Roger (Galson Sciences Limited, Oakham (GB))

    2008-03-15

    In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The purposes of the SR-Can project were stated in the main project report to be: 1. To make a first assessment of the safety of potential KBS-3 repositories at Forsmark and Laxemar to dispose of canisters as specified in the application for the encapsulation plant. 2. To provide feedback to design development, to SKB's research and development (R and D) programme, to further site investigations and to future safety assessments. 3. To foster a dialogue with the authorities that oversee SKB's activities, i.e. the Swedish Nuclear Power Inspectorate, SKI, and the Swedish Radiation Protection Authority, SSI, regarding interpretation of applicable regulations, as a preparation for the SR-Site project. To help inform their review of SKB's proposed approach to development of the longterm safety case, the authorities appointed three international expert review teams to carry out a review of SKB's SR-Can safety assessment report. Comments from one of these teams - the Safety Assessment Methodology (SAM) review team - are presented in this document. The SAM review team's scope of work included an examination of SKB's documentation of the assessment ('Long-term safety for KBS-3 Repositories at Forsmark and Laxemar - a first evaluation' and several supporting reports) and hearings with SKB staff and contractors, held in March 2007. As directed by SKI and SSI, the SAM review team focused on methodological aspects and sought to determine whether SKB's proposed safety assessment methodology is likely to be suitable for use in the future SR-Site and to assess its consistency with the Swedish regulatory framework. No specific evaluation of long-term safety or site acceptability was undertaken by any of the review teams. SKI and SSI's Terms of Reference for the SAM

  9. SSI and SKI's Review of SKB's Updated Final Safety Report for SFR 1. Review Report

    International Nuclear Information System (INIS)

    2003-10-01

    The Repository for Radioactive Operational Waste (SFR 1) is now the object of a new review by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). One of the stipulations for operating SFR 1 was that a new assessment of the long-term performance and environmental consequences of the repository should be conducted once every 10 years by the licensee, the Swedish Nuclear Fuel and Waste Management Co (SKB). During the time that SFR 1 has been in operation, experience has been gained of operating the facility and new knowledge of long-term performance of SFR 1 has been obtained. New regulations for nuclear facilities have been promulgated since SFR 1 was taken into operation (1988). A review committee comprising employees from SKI and SSI has conducted the review of SSR 2001. This review report has resulted in the committee's evaluation of the safety of SFR 1 and is the basis of the regulatory authorities' decision concerning any amendments to the stipulations for the operation of SFR 1. However, the review has found deficiencies in the follow up of the development of design basis norms since the facility was constructed as well as deficiencies in learning from operating experience. However, the overall evaluation is that the facility is being operated in an acceptable manner from the standpoint of safety. With respect to the long-term performance of the repository, it is a deficiency that SSR 2001 does not describe how compliance with the stipulated radiation protection requirements on optimisation and use of the best available technology (BAT) is achieved during operation. In the opinion of the review committee, issues relating to occupational radiation protection are being handled satisfactorily and the operational releases of radioactive substances are very small. Safety and Radiation Protection after Closure SKB's long-term repository performance assessment contains essential updates and improvements compared with the

  10. A Review of Research on Driving Styles and Road Safety.

    Science.gov (United States)

    Sagberg, Fridulv; Selpi; Piccinini, Giulio Francesco Bianchi; Engström, Johan

    2015-11-01

    The aim of this study was to outline a conceptual framework for understanding driving style and, on this basis, review the state-of-the-art research on driving styles in relation to road safety. Previous research has indicated a relationship between the driving styles adopted by drivers and their crash involvement. However, a comprehensive literature review of driving style research is lacking. A systematic literature search was conducted, including empirical, theoretical, and methodological research, on driving styles related to road safety. A conceptual framework was proposed whereby driving styles are viewed in terms of driving habits established as a result of individual dispositions as well as social norms and cultural values. Moreover, a general scheme for categorizing and operationalizing driving styles was suggested. On this basis, existing literature on driving styles and indicators was reviewed. Links between driving styles and road safety were identified and individual and sociocultural factors influencing driving style were reviewed. Existing studies have addressed a wide variety of driving styles, and there is an acute need for a unifying conceptual framework in order to synthesize these results and make useful generalizations. There is a considerable potential for increasing road safety by means of behavior modification. Naturalistic driving observations represent particularly promising approaches to future research on driving styles. Knowledge about driving styles can be applied in programs for modifying driver behavior and in the context of usage-based insurance. It may also be used as a means for driver identification and for the development of driver assistance systems. © 2015, Human Factors and Ergonomics Society.

  11. Immunization Safety Review: Thimerosal - Containing Vaccines and Neurodevelopmental Disorders

    National Research Council Canada - National Science Library

    Stratton, Kathleen; Gable, Alicia; McCormick, Marie C

    2001-01-01

    In this report, the Immunization Safety Review committee examines the hypothesis of whether or not the use of vaccines containing the preservative thimerosal can cause neurodevelopmental disorders (NDDs...

  12. A probabilistic safety assessment PEER review: Case study on the use of probabilistic safety assessment for safety decisions

    International Nuclear Information System (INIS)

    1989-10-01

    The purpose of this case study is to illustrate, using an actual example, the organizing and carrying out of an independent peer review of a draft full-scope (level 3) probabilistic safety assessment. The specific findings of the peer review are of less importance than the approach taken, the interaction between sponsor and study team, and the technical and administrative issues that can arise during a peer review. This case study will examine the following issues: how the scope of the peer review was established, based on how it was to be used by the review sponsoring body; how the level of effort was determined, and what this determination meant for the technical quality of the review; how the team of peer reviewers was selected; how the review itself was carried out; what findings were made; what was done with these findings by both the review sponsoring body and the PSA analysis team. 9 refs, 2 figs, 1 tab

  13. Episodic Laryngeal Breathing Disorders: Literature Review and Proposal of Preliminary Theoretical Framework.

    Science.gov (United States)

    Shembel, Adrianna C; Sandage, Mary J; Verdolini Abbott, Katherine

    2017-01-01

    The purposes of this literature review were (1) to identify and assess frameworks for clinical characterization of episodic laryngeal breathing disorders (ELBD) and their subtypes, (2) to integrate concepts from these frameworks into a novel theoretical paradigm, and (3) to provide a preliminary algorithm to classify clinical features of ELBD for future study of its clinical manifestations and underlying pathophysiological mechanisms. This is a literature review. Peer-reviewed literature from 1983 to 2015 pertaining to models for ELBD was searched using Pubmed, Ovid, Proquest, Cochrane Database of Systematic Reviews, and Google Scholar. Theoretical models for ELBD were identified, evaluated, and integrated into a novel comprehensive framework. Consensus across three salient models provided a working definition and inclusionary criteria for ELBD within the new framework. Inconsistencies and discrepancies within the models provided an analytic platform for future research. Comparison among three conceptual models-(1) Irritable larynx syndrome, (2) Dichotomous triggers, and (3) Periodic occurrence of laryngeal obstruction-showed that the models uniformly consider ELBD to involve episodic laryngeal obstruction causing dyspnea. The models differed in their description of source of dyspnea, in their inclusion of corollary behaviors, in their inclusion of other laryngeal-based behaviors (eg, cough), and types of triggers. The proposed integrated theoretical framework for ELBD provides a preliminary systematic platform for the identification of key clinical feature patterns indicative of ELBD and associated clinical subgroups. This algorithmic paradigm should evolve with better understanding of this spectrum of disorders and its underlying pathophysiological mechanisms. Copyright © 2017 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  14. Deep Borehole Disposal Safety Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Freeze, Geoffrey A. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Stein, Emily [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Price, Laura L. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); MacKinnon, Robert J. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Tillman, Jack Bruce [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    This report presents a preliminary safety analysis for the deep borehole disposal (DBD) concept, using a safety case framework. A safety case is an integrated collection of qualitative and quantitative arguments, evidence, and analyses that substantiate the safety, and the level of confidence in the safety, of a geologic repository. This safety case framework for DBD follows the outline of the elements of a safety case, and identifies the types of information that will be required to satisfy these elements. At this very preliminary phase of development, the DBD safety case focuses on the generic feasibility of the DBD concept. It is based on potential system designs, waste forms, engineering, and geologic conditions; however, no specific site or regulatory framework exists. It will progress to a site-specific safety case as the DBD concept advances into a site-specific phase, progressing through consent-based site selection and site investigation and characterization.

  15. Recommendations and comments on the report of the Ontario Nuclear Safety Review

    International Nuclear Information System (INIS)

    1988-12-01

    The report of the Ontario Nuclear Safety Review (ONSR) prepared by Dr. F. Kenneth Hare in March 1988, is reviewed by the Advisory Committee on Nuclear Safety (ACNS) to assess for the Atomic Energy Control Board the relevance and importance of the ONSR recommendations and comments. The ACNS conclusions from this study are embodied in nineteen recommendations, as well as several suggestions and some specific comments

  16. Grasping at Straws: Comments on the Alberta Pipeline Safety Review

    Directory of Open Access Journals (Sweden)

    Jennifer Winter

    2013-09-01

    Full Text Available The release last month of the Alberta Pipeline Safety Review was meant to be a symbol of the province’s renewed commitment to environmental responsibility as it aims for new export markets. The report’s authors, Group 10 Engineering, submitted 17 recommendations covering public safety and pipeline incidents, pipeline integrity management and pipeline safety near bodies of water — and many of them run the gamut from the obvious to the unhelpful to the contradictory. That the energy regulator ought to be staffed to do its job should go without saying; in fact, staffing levels were never identified as an issue. The recommendation that record retention and transfer requirements be defined for mergers and acquisitions, sales and takeovers is moot. There is no reason a purchasing party would not want all relevant documents, and no real way to enforce transparency if the seller opts to withhold information. Harmonizing regulations between provinces could reduce companies’ cost of doing business, but could also prove challenging if different jurisdictions use performance-based regulations — which is what the Review recommended Alberta consider. This very brief paper pries apart the Review’s flaws and recommends that the province go back to the drawing board. Safety is a serious issue; a genuine statistical review linking pipeline characteristics to failures and risk-mitigation activities would be a better alternative by far.

  17. Draft audit report, human factors engineering control room design review: Saint Lucie Nuclear Power Plant, Unit No. 2

    International Nuclear Information System (INIS)

    Peterson, L.R.; Lappa, D.A.; Moore, J.W.

    1981-01-01

    A human factors engineering preliminary design review of the Saint Lucie Unit 2 control room was performed at the site on August 3 through August 7, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The review team included human factors consultants from BioTechnology, Inc., Falls Church, Virginia, and from Lawrence Livermore National Laboratory (University of California), Livermore, California

  18. Survey of systems safety analysis methods and their application to nuclear waste management systems

    International Nuclear Information System (INIS)

    Pelto, P.J.; Winegardner, W.K.; Gallucci, R.H.V.

    1981-11-01

    This report reviews system safety analysis methods and examines their application to nuclear waste management systems. The safety analysis methods examined include expert opinion, maximum credible accident approach, design basis accidents approach, hazard indices, preliminary hazards analysis, failure modes and effects analysis, fault trees, event trees, cause-consequence diagrams, G0 methodology, Markov modeling, and a general category of consequence analysis models. Previous and ongoing studies on the safety of waste management systems are discussed along with their limitations and potential improvements. The major safety methods and waste management safety related studies are surveyed. This survey provides information on what safety methods are available, what waste management safety areas have been analyzed, and what are potential areas for future study

  19. Survey of systems safety analysis methods and their application to nuclear waste management systems

    Energy Technology Data Exchange (ETDEWEB)

    Pelto, P.J.; Winegardner, W.K.; Gallucci, R.H.V.

    1981-11-01

    This report reviews system safety analysis methods and examines their application to nuclear waste management systems. The safety analysis methods examined include expert opinion, maximum credible accident approach, design basis accidents approach, hazard indices, preliminary hazards analysis, failure modes and effects analysis, fault trees, event trees, cause-consequence diagrams, G0 methodology, Markov modeling, and a general category of consequence analysis models. Previous and ongoing studies on the safety of waste management systems are discussed along with their limitations and potential improvements. The major safety methods and waste management safety related studies are surveyed. This survey provides information on what safety methods are available, what waste management safety areas have been analyzed, and what are potential areas for future study.

  20. [Evidence-based effectiveness of road safety interventions: a literature review].

    Science.gov (United States)

    Novoa, Ana M; Pérez, Katherine; Borrell, Carme

    2009-01-01

    Only road safety interventions with scientific evidence supporting their effectiveness should be implemented. The objective of this study was to identify and summarize the available evidence on the effectiveness of road safety interventions in reducing road traffic collisions, injuries and deaths. All literature reviews published in scientific journals that assessed the effectiveness of one or more road safety interventions and whose outcome measure was road traffic crashes, injuries or fatalities were included. An exhaustive search was performed in scientific literature databases. The interventions were classified according to the evidence of their effectiveness in reducing road traffic injuries (effective interventions, insufficient evidence of effectiveness, ineffective interventions) following the structure of the Haddon matrix. Fifty-four reviews were included. Effective interventions were found before, during and after the collision, and across all factors: a) the individual: the graduated licensing system (31% road traffic injury reduction); b) the vehicle: electronic stability control system (2 to 41% reduction); c) the infrastructure: area-wide traffic calming (0 to 20%), and d) the social environment: speed cameras (7 to 30%). Certain road safety interventions are ineffective, mostly road safety education, and others require further investigation. The most successful interventions are those that reduce or eliminate the hazard and do not depend on changes in road users' behavior or on their knowledge of road safety issues. Interventions based exclusively on education are ineffective in reducing road traffic injuries.

  1. Early Botulinum Toxin Injections in Infants With Musculoskeletal Disorders: A Systematic Review of Safety and Effectiveness.

    Science.gov (United States)

    Bourseul, Jean-Sébastien; Molina, Anais; Lintanf, Mael; Houx, Laetitia; Chaléat-Valayer, Emmanuelle; Pons, Christelle; Brochard, Sylvain

    2018-06-01

    To report current evidence regarding the safety of intramuscular botulinum toxin injection (BTI) in children with orthopedic- and neurologic-related musculoskeletal disorders >2 years of age. PubMed, Cochrane Library, and ScienceDirect, Google Scholar, and Web of Science. Two reviewers independently selected studies based on predetermined inclusion criteria. Data relating to the aim were extracted. Methodologic quality was graded independently by 2 reviewers using the Physiotherapy Evidence Database scale for randomized controlled trials (RCTs) and the Downs and Black evaluation tool for non-RCTs. Level of evidence was determined using the modified Sackett scale. Data of 473 infants were analyzed. Fifty-five infants had cerebral palsy, 112 had obstetric brachial plexus palsy, 257 had clubfoot, and 44 had congenital torticollis. No studies reported any severe adverse event that could be attributed to the BTI. The rate of mild to moderate adverse events reported varied from 5% to 25%. Results regarding efficacy were preliminary, dependent on the pathology, and limited by the small number of studies and their low levels of evidence. BTI is already widely used as an early treatment for this age group. The safety profile of BTI in infants appears similar to that of older children and risks appear more related to the severity of the pathology and the location of the injections than to the toxin itself. Regarding effectiveness, other studies with higher levels of evidence should be carried out for each specific pathology. Copyright © 2017 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  2. Trends in HFE Methods and Tools and Their Applicability to Safety Reviews

    Energy Technology Data Exchange (ETDEWEB)

    O' Hara, J.M.; Plott, C.; Milanski, J.; Ronan, A.; Scheff, S.; Laux, L.; and Bzostek, J.

    2009-09-30

    The U.S. Nuclear Regulatory Commission's (NRC) conducts human factors engineering (HFE) safety reviews of applicant submittals for new plants and for changes to existing plants. The reviews include the evaluation of the methods and tools (M&T) used by applicants as part of their HFE program. The technology used to perform HFE activities has been rapidly evolving, resulting in a whole new generation of HFE M&Ts. The objectives of this research were to identify the current trends in HFE methods and tools, determine their applicability to NRC safety reviews, and identify topics for which the NRC may need additional guidance to support the NRC's safety reviews. We conducted a survey that identified over 100 new HFE M&Ts. The M&Ts were assessed to identify general trends. Seven trends were identified: Computer Applications for Performing Traditional Analyses, Computer-Aided Design, Integration of HFE Methods and Tools, Rapid Development Engineering, Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. We assessed each trend to determine its applicability to the NRC's review by considering (1) whether the nuclear industry is making use of M&Ts for each trend, and (2) whether M&Ts reflecting the trend can be reviewed using the current design review guidance. We concluded that M&T trends that are applicable to the commercial nuclear industry and are expected to impact safety reviews may be considered for review guidance development. Three trends fell into this category: Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. The other trends do not need to be addressed at this time.

  3. Trends in HFE Methods and Tools and Their Applicability to Safety Reviews

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Plott, C.; Milanski, J.; Ronan, A.; Scheff, S.; Laux, L.; Bzostek, J.

    2009-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) conducts human factors engineering (HFE) safety reviews of applicant submittals for new plants and for changes to existing plants. The reviews include the evaluation of the methods and tools (M and T) used by applicants as part of their HFE program. The technology used to perform HFE activities has been rapidly evolving, resulting in a whole new generation of HFE M and Ts. The objectives of this research were to identify the current trends in HFE methods and tools, determine their applicability to NRC safety reviews, and identify topics for which the NRC may need additional guidance to support the NRC's safety reviews. We conducted a survey that identified over 100 new HFE M and Ts. The M and Ts were assessed to identify general trends. Seven trends were identified: Computer Applications for Performing Traditional Analyses, Computer-Aided Design, Integration of HFE Methods and Tools, Rapid Development Engineering, Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. We assessed each trend to determine its applicability to the NRC's review by considering (1) whether the nuclear industry is making use of M and Ts for each trend, and (2) whether M and Ts reflecting the trend can be reviewed using the current design review guidance. We concluded that M and T trends that are applicable to the commercial nuclear industry and are expected to impact safety reviews may be considered for review guidance development. Three trends fell into this category: Analysis of Cognitive Tasks, Use of Virtual Environments and Visualizations, and Application of Human Performance Models. The other trends do not need to be addressed at this time.

  4. Nuclear Safety Review for the Year 2007

    International Nuclear Information System (INIS)

    2008-07-01

    In 2007, the 50th anniversary year of the Agency, the safety performance of the nuclear industry, on the whole, remained high, although incidents and accidents with no significant impact on public health and safety continue to make news headlines and challenge operators and regulators. It is therefore essential to maintain vigilance, continuously improve safety culture and enhance the international sharing and utilization of operating and other safety experience, including that resulting from natural events. The establishment and sustainability of infrastructures for all aspects of nuclear, radiation, transport and waste safety will remain a high priority. Member States embarking on nuclear power programmes will need to be active participants in the global nuclear safety regime. Harmonized safety standards, the peer review mechanism among contracting parties of the safety conventions, and sharing safety knowledge and best practices through networking are key elements for the continuous strengthening of the global nuclear safety regime. Technical and scientific support organizations (TSOs), whether part of the regulatory body or a separate organization, are gaining increased importance by providing the technical and scientific basis for safety related decisions and activities. There is a need for enhanced interaction and cooperation between TSOs. Academic and industrial expert communities also play a vital role in improving safety cooperation and capacity building. Countries embarking on nuclear power programmes, as well as countries expanding existing programmes, have to meet the challenge of building a technically qualified workforce. A vigorous knowledge transfer programme is key to capacity building - particularly in view of the ageing of experienced professionals in the nuclear field. National and regional safety networks, and ultimately a global safety network will greatly help these efforts. Changes in world markets and technology are having an impact on both

  5. Measures to strengthen international co-operation in nuclear, radiation and transport safety and waste management. Nuclear safety review for the year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    The Nuclear Safety Review for the Year 2003 presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety during 2003. As in 2002 the overview is supported by more detailed Notes by the Secretariat: Safety Related Events and Issues Worldwide during 2003 (document 2004/Note 6), The Agency's Safety Standards: Activities during 2003 (document 2004/Note 7) and Providing for the Application of the Safety Standards (document 2004/Note 8). In January 2003, the Agency implemented an organization change and developed an integrated approach to reflect a broader assignment of nuclear safety and nuclear security and to better exploit synergy between them. The Office of Physical Protection and Material Security renamed to Office of Nuclear Security was transferred from the Department of Safeguards to the Department of Nuclear Safety, which became the Department of Nuclear Safety and Security to reflect the change. This Review provides information primarily on nuclear safety, and nuclear security will be addressed in a separate report

  6. Deep repository for long-lived low- and intermediate-level waste. Preliminary safety assessment

    International Nuclear Information System (INIS)

    1999-11-01

    A preliminary safety assessment has been performed of a deep repository for long-lived low- and intermediate-level waste, SFL 3-5. The purpose of the study is to investigate the capacity of the facility to act as a barrier to the release of radionuclides and toxic pollutants, and to shed light on the importance of the location of the repository site. A safety assessment (SR 97) of a deep repository for spent fuel has been carried out at the same time. In SR 97, three hypothetical repository sites have been selected for study. These sites exhibit fairly different conditions in terms of hydrogeology, hydrochemistry and ecosystems. To make use of information and data from the SR 97 study, we have assumed that SFL 3-5 is co-sited with the deep repository for spent fuel. A conceivable alternative is to site SFL 3-5 as a completely separate repository. The focus of the SFL 3-5 study is a quantitative analysis of the environmental impact for a reference scenario, while other scenarios are discussed and analyzed in more general terms. Migration in the repository's near- and far-field has been taken into account in the reference scenario. Environmental impact on the three sites has also been calculated. The calculations are based on an updated forecast of the waste to be disposed of in SFL 3-5. The forecast includes radionuclide content, toxic metals and other substances that have a bearing on a safety assessment. The safety assessment shows how important the site is for safety. Two factors stand out as being particularly important: the water flow at the depth in the rock where the repository is built, and the ecosystem in the areas on the ground surface where releases may take place in the future. Another conclusion is that radionuclides that are highly mobile and long-lived, such as 36 Cl and 93 Mo , are important to take into consideration. Their being long-lived means that barriers and the ecosystems must be regarded with a very long time horizon

  7. Role of FFTF in assessing structural feedbacks and inherent safety of LMR's

    International Nuclear Information System (INIS)

    Padilla, A.; Omberg, R.P.; O'Dell, L.D.; Harris, R.A.; Nguyen, D.H.; Waltar, A.E.

    1985-03-01

    The possibility of developing reactor designs with inherent safety characteristics sufficient to provide ''walk away'' safety is receiving additional emphasis in the LMR program. A key element in this effort is the recognition that LMR's possess safety characteristics above and beyond those employed in past safety review processes. Some of these additional safety characteristics are due to reactivity feedback effects caused by small structural movements during hypothetical severe design transients. The effect of these characteristics upon the behavior of the FFTF under such transients has been assessed and is discussed in this paper. The paper also presents a preliminary test matrix which might allow experimental verification of the structural reactivity feedback effects. Such experimental verification should be very useful to innovative designers seeking to optimize inherent safety. 8 refs., 1 fig., 2 tabs

  8. REVIEW OF SAFETY AND TOLERANCE OF OMALIZUMAB

    Directory of Open Access Journals (Sweden)

    A.V. Emel'yanov

    2008-01-01

    Full Text Available The review of safety of monoclonal anti-ige-antibodies (xolair — a new medication for the treatment of severe allergic bronchial asthma is presented. Local and system adverse events, originating after injection of medicament in clinical studies and following administration in patients are discussed.Key words: children, bronchial asthma, monoclonal anti Ige antibodies.

  9. Experience in the review of utility control room design review and safety parameter display system programs

    International Nuclear Information System (INIS)

    Moore, V.A.

    1985-01-01

    The Detailed Control Room Design Review (DCRDR) and the Safety Parameter Display System (SPDS) had their origins in the studies and investigations conducted as the result of the TMI-2 accident. The President's Commission (Kemeny Commission) critized NRC for not examining the man-machine interface, over-emphasizing equipment, ignoring human beings, and tolerating outdated technology in control rooms. The Commission's Special Inquiry Group (Rogovin Report) recommended greater application of human factors engineering including better instrumentation displays and improved control room design. The NRC Lessons Learned Task Force concluded that licensees should review and improve control rooms using NRC Human engineering guidelines, and install safety parameter display systems (then called the safety staff vector). The TMI Action Plan Item I.D.1 and I.D.2 were based on these recommendations

  10. Green light for the methodology file. Periodical safety review 2016 has begun

    International Nuclear Information System (INIS)

    2014-01-01

    Every ten years, the organisational framework and the facilities of the Belgian Nuclear Research Center SCK-CEN are subject to an encompassing safety evaluation. Together with initiatives arising from the stress tests, a large number of safety studies and actions are scheduled until 2018. The article discusses the ongoing safety review.

  11. International Expert Team Concludes IAEA Peer Review of Bulgaria's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: An international team of senior nuclear safety and radiation protection experts today concluded a 12-day mission to review the regulatory framework for nuclear and radiation safety in Bulgaria. The Integrated Regulatory Review Service (IRRS) mission, conducted at the request of the Government of Bulgaria, identified a series of good practices and made recommendations to help enhance the overall performance of the regulatory system. IRRS missions, which were initiated in 2006, are peer reviews based on the IAEA Safety Standards; they are not inspections or audits. ''Bulgaria has a clear national policy and strategy for safety, which are well in line with international standards and practices and contribute to a high level of nuclear safety,'' said Mission Team Leader Marta Ziakova, Chairperson of the Nuclear Regulatory Authority of the Slovak Republic. The mission team, which conducted the review from 8 to 19 April, was made up of 16 senior regulatory experts from 16 nations, and six IAEA staff. ''The results of the IRRS mission will be valuable for the future development and reinforcement of the Bulgarian Nuclear Safety Agency (BNRA). The use of international standards and good practices helps to improve global harmonization in all areas of nuclear safety and radiation protection,'' said Sergey Tzotchev, Chairman of the BNRA. Among the main observations in its preliminary report, the IRRS mission team found that BNRA operates as an independent regulatory body and conducts its regulatory processes in an open and transparent manner. In line with the IAEA Action Plan on Nuclear Safety, the mission reviewed the regulatory implications for Bulgaria of the March 2011 accident at TEPCO's Fukushima Daiichi Nuclear Power Station in Japan. It found that the BNRA's response to the lessons learned from that accident was both prompt and effective. Strengths and good practices identified by the IRRS team include the following: A no-blame policy is enshrined in law for

  12. Human factors evaluation of man-machine interface for periodic safety review of nuclear power plants

    International Nuclear Information System (INIS)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang; Hwang, In Koo; Lee, Hyun Cheol; Jang, Tong Il; Ku, Jin Young; Kim, Soo Jin

    2004-12-01

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Nuclear Power Plants(NPPs). As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area

  13. Occupational health and safety issues affecting young workers: a literature review.

    Science.gov (United States)

    Laberge, Marie; Ledoux, Elise

    2011-01-01

    Many overview articles, reports, book chapters and literature reviews have examined the health and safety of young workers. These sources discuss the relationships between the work conditions of young workers and the various indicators of accidents and occupational diseases. Breslin et al. [12,13] conducted two literature reviews of quantitative studies to determine which factors best predicted work accidents and occupational disorders in young people. The present article proposes a review of young people's occupational health and safety (OHS) factors (e.g., demographic, individual, professional, organizational, temporal and operational factors) in both qualitative and quantitative studies. Five types of problems were analyzed in greater depth, namely MSD symptoms, respiratory, allergy and toxicological problems, mental health and well-being, alcohol and drug consumption, and fatigue. This review likewise examines related dimensions that allow us to adopt a more global perspective on this subject by considering such elements as young people's values, their knowledge and attitudes, safety practices in companies, the safe integration of young people, and rehabilitation. A total of 189 scientific articles were selected on the basis of certain criteria. These articles came from refereed OHS journals published between 1994 and 2005.

  14. Patient Safety Learning Systems: A Systematic Review and Qualitative Synthesis.

    Science.gov (United States)

    2017-01-01

    A patient safety learning system (sometimes called a critical incident reporting system) refers to structured reporting, collation, and analysis of critical incidents. To inform a provincial working group's recommendations for an Ontario Patient Safety Event Learning System, a systematic review was undertaken to determine design features that would optimize its adoption into the health care system and would inform implementation strategies. The objective of this review was to address two research questions: (a) what are the barriers to and facilitators of successful adoption of a patient safety learning system reported by health professionals and (b) what design components maximize successful adoption and implementation? To answer the first question, we used a published systematic review. To answer the second question, we used scoping study methodology. Common barriers reported in the literature by health care professionals included fear of blame, legal penalties, the perception that incident reporting does not improve patient safety, lack of organizational support, inadequate feedback, lack of knowledge about incident reporting systems, and lack of understanding about what constitutes an error. Common facilitators included a non-accusatory environment, the perception that incident reporting improves safety, clarification of the route of reporting and of how the system uses reports, enhanced feedback, role models (such as managers) using and promoting reporting, legislated protection of those who report, ability to report anonymously, education and training opportunities, and clear guidelines on what to report. Components of a patient safety learning system that increased successful adoption and implementation were emphasis on a blame-free culture that encourages reporting and learning, clear guidelines on how and what to report, making sure the system is user-friendly, organizational development support for data analysis to generate meaningful learning outcomes

  15. International Nuclear Safety Experts Conclude IAEA Peer Review of Korea's Regulatory System

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of senior nuclear safety experts concluded today a two-week mission to review the regulatory framework for nuclear safety in the Republic of Korea. The team identified good practices and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of Korea, while the final report will be submitted by the end of summer 2011. At the request of the Korean Government, the IAEA assembled a team of 16 senior regulatory experts from 14 nations to conduct the Integrated Regulatory Review Service (IRRS) mission involving the Korean Ministry for Education, Science and Technology (MEST) and the Korean Institute for Nuclear Safety (KINS). The mission is a peer-review based on the IAEA Safety Standards. ''This was the first IRRS mission organized after Japan's Fukushima Daiichi nuclear accident and it included a review of the regulatory implications of that event,' explains Denis Flory, IAEA Deputy Director General and Head of the Department of Nuclear Safety and Security. William Borchardt, Executive Director of Operations from the US Nuclear Regulatory Commission and Team Leader of this mission commended the Korean authorities for their openness and commitment to sharing their experience with the world's nuclear safety community. ''IRRS missions such as the one that was just concluded here in the Republic of Korea are crucial to the enhancement of nuclear safety worldwide,'' he said. The IRRS team reviewed Korea's current regulatory framework while acknowledging the fact that the country's Government has already decided to establish, as of October 2011, a new independent regulatory body to be called Nuclear Safety Commission (NSC). As a consequence, KINS role will be as a regulatory expert organization reporting to the NSC, while MEST's role will be restricted to promoting the utilization of nuclear energy. The IRRS team identified particular strengths in the Korean regulatory system

  16. Nuclear Safety Research Review Committee

    International Nuclear Information System (INIS)

    Todreas, N.E.

    1990-01-01

    The Nuclear Safety Research Review Committee has had a fundamental difficulty because of the atmosphere that has existed since it was created. It came into existence at a time of decreasing budgets. For any Committee the easiest thing is to tell the Director what additional to do. That does not really help him a lot in this atmosphere of reduced budgets which he reviewed for you on Monday. Concurrently the research arm of Nuclear Regulatory Commission has recognized that the scope of its activity needed to be increased rather than decreased. In the last two-and-a-half-year period, human factors work was reinstated, radiation and health effects investigations were reinvigorated, research in the waste area was given significant acceleration. Further, accident management came into being, and the NRC finally got back into the TMI-2 area. So with all of those activities being added to the program at the same time that the research budget was going down, the situation has become very strained. What that leads to regarding Committee membership is a need for technically competent generalists who will be able to sit as the Division Directors come in, as the contractors come in, and sort the wheat from the chaff. The Committee needs people who are interested in and have a broad perspective on what regulatory needs are and specifically how safety research activities can contribute to them. The author summarizes the history of the Committee, the current status, and plans for the future

  17. International review on safety requirements for the prototype fast breeder reactor “Monju”

    International Nuclear Information System (INIS)

    2016-01-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  18. Preliminary Integrated Safety Analysis Status Report

    International Nuclear Information System (INIS)

    Gwyn, D.

    2001-01-01

    This report provides the status of the potential Monitored Geologic Repository (MGR) Integrated Safety Analysis (EA) by identifying the initial work scope scheduled for completion during the ISA development period, the schedules associated with the tasks identified, safety analysis issues encountered, and a summary of accomplishments during the reporting period. This status covers the period from October 1, 2000 through March 30, 2001

  19. A Preliminary Study on the Measures to Assess the Organizational Safety: The Cultural Impact on Human Error Potential

    International Nuclear Information System (INIS)

    Lee, Yong Hee; Lee, Yong Hee

    2011-01-01

    The Fukushima I nuclear accident following the Tohoku earthquake and tsunami on 11 March 2011 occurred after twelve years had passed since the JCO accident which was caused as a result of an error made by JCO employees. These accidents, along with the Chernobyl accident, associated with characteristic problems of various organizations caused severe social and economic disruptions and have had significant environmental and health impact. The cultural problems with human errors occur for various reasons, and different actions are needed to prevent different errors. Unfortunately, much of the research on organization and human error has shown widely various or different results which call for different approaches. In other words, we have to find more practical solutions from various researches for nuclear safety and lead a systematic approach to organizational deficiency causing human error. This paper reviews Hofstede's criteria, IAEA safety culture, safety areas of periodic safety review (PSR), teamwork and performance, and an evaluation of HANARO safety culture to verify the measures used to assess the organizational safety

  20. A Preliminary Study on the Measures to Assess the Organizational Safety: The Cultural Impact on Human Error Potential

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Yong Hee [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2011-10-15

    The Fukushima I nuclear accident following the Tohoku earthquake and tsunami on 11 March 2011 occurred after twelve years had passed since the JCO accident which was caused as a result of an error made by JCO employees. These accidents, along with the Chernobyl accident, associated with characteristic problems of various organizations caused severe social and economic disruptions and have had significant environmental and health impact. The cultural problems with human errors occur for various reasons, and different actions are needed to prevent different errors. Unfortunately, much of the research on organization and human error has shown widely various or different results which call for different approaches. In other words, we have to find more practical solutions from various researches for nuclear safety and lead a systematic approach to organizational deficiency causing human error. This paper reviews Hofstede's criteria, IAEA safety culture, safety areas of periodic safety review (PSR), teamwork and performance, and an evaluation of HANARO safety culture to verify the measures used to assess the organizational safety

  1. The application of integrated safety management principles to the Tritium Extraction Facility project

    International Nuclear Information System (INIS)

    Hickman, M.O.; Viviano, R.R.

    2000-01-01

    The DOE has developed a program that is accomplishing a heightened safety posture across the complex. The Integrated Safety Management (ISM) System (ISMS) program utilizes five core functions and seven guiding principles as the basis for implementation. The core functions define the work scope, analyze the hazards, develop and implement hazard controls, perform the work, and provide feedback for improvement. The guiding principles include line management responsibility, clear roles and responsibilities, competence per responsibilities, identification of safety standards/requirements, tailored hazard control, balanced priorities, and operations authorization. There exists an unspecified eighth principle, that is, worker involvement. A program requiring the direct involvement of the employees who are actually performing the work has been shown to be quite an effective method of communicating safety requirements, controlling work in a safe manner, and reducing safety violations and injuries. The Tritium Extraction Facility (TEF) projects, a component of the DOE's Commercial Light Water Reactor Tritium Production program, has taken the ISM principles and core functions and applied them to the project's design. The task of the design team is to design a facility and systems that will meet the production requirements of the DOE tritium mission as well as a design that minimizes the workers' exposure to adverse safety situations and hazards/hazardous materials. During the development of the preliminary design for the TEF, design teams consisted of not only designers but also personnel who had operational experience in the existing tritium and personnel who had operational experience in the existing tritium and personnel who had specialized experience from across the DOE complex. This design team reviewed multiple documents associated with the TEF operation in order to identify and document the hazards associated with the tritium process. These documents include hazards

  2. Re-assessment of seismic loads in conjunction with periodic safety review

    International Nuclear Information System (INIS)

    Jonczyk, Josef

    2002-01-01

    The objective of this paper is the fundamental consideration of a safeguard-aim-oriented approach for use in the re-assessment of seismic events with regard to the periodic safety review (PSR) of nuclear power plants (NPP). The re-assessment aspects of site-specific design earthquakes (DEQ), specially the procedure for seismic hazard analysis, will not, however, be considered in detail here. The proposed assessment concept clearly presents a general approach for safety assessments. The approach is based on a successive screening review of components that are considered sufficiently earthquake-resistant. In this respect, the principle of maximum practical application of the design documentation has been considered in the re-assessment process. On the other hand, the safeguard-aim-oriented evaluation will also be applied with regard to whether the requirements of the safety regulations are fulfilled with respect to the safety goals. The review in conjunction with PSR does not, however, attempt to perform this under all technical aspects. Moreover, it is possible to make extensive use of experimental knowledge and engineering judgement with regard to the structural capacity behaviour in case of a seismic event. Compared with design procedures, however, this proposed approach differs from the one applied in licensing procedures, in which such assessment freedom will not usually be exhausted. (author)

  3. Criteria for safety-related nuclear plant operator actions: a preliminary assessment of available data

    International Nuclear Information System (INIS)

    Haas, P.M.; Bott, T.F.

    1980-01-01

    In the US, an effort has been underway for a number of years to develop a design standard to define when required manual operator action can be accepted as part of a nuclear plant design basis. Insufficient data are available to provide quantitative guidelines for the standard. To provide the necessary data base to support such standards and the necessary quantitative assessment of operator reliability, the US Nuclear Regulatory Commission is sponsoring a study at Oak National Laboratory to develop the data base. A preliminary assessment completed in April, 1979 concluded that sufficient data from US operating experience did not exist to provide an adequate data base. A program of research using full-scope nuclear plant simulators and results that are correlated to field data was suggested. That program was recently initiated. The approach, results and conclusions of the preliminary assessment are reviewed and the planned research program of simulator studies is summarised. (author)

  4. Development of a draft of human factors safety review procedures for the Korean Next Generation Reactor

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C.

    2000-02-01

    In this study, a draft of Human Factors Engineering (HFE) Safety Review Procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE program management, human factors analyses, human factors design, and HFE verification and validation, based on section 15.1 'human factors engineering design process' and 15.2 'control room human factors engineering' of KNGR specific safety requirements and chapter 15 'human factors engineering' of KNGR safety regulatory guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system

  5. Regulatory review of probabilistic safety assessment (PSA) Level 2

    International Nuclear Information System (INIS)

    2001-07-01

    Probabilistic safety assessment (PSA) is increasingly being used as part of the decision making process to assess the level of safety of nuclear power plants. The methodologies in use are maturing and the insights gained from the PSAs are being used along with those from deterministic analysis. Many regulatory authorities consider the current state of the art in PSA to be sufficiently well developed for results to be used centrally in the regulatory decision making process-referred to as risk informed regulation. For these applications to be successful, it will be necessary for the regulatory authority to have a high degree of confidence in the PSA. However, at the 1994 IAEA Technical Committee Meeting on Use of PSA in the Regulatory Process and at the OECD Nuclear Energy Agency Committee for Nuclear Regulatory Activities (CNRA) 'Special Issues' meeting in 1997 on Review Procedures and Criteria for Different Regulatory Applications of PSA, it was recognized that formal regulatory review guidance for PSA did not exist. The senior regulators noted that there was a need to produce some international guidance for reviewing PSAs to establish an agreed basis for assessing whether important technological and methodological issues in PSAs are treated adequately and to verify that conclusions reached are appropriate. In 1997, the IAEA and OECD Nuclear Energy Agency agreed to produce, in cooperation, guidance on Regulatory Review of PSA. This led to the publication of IAEA-TECDOC-1135 on the Regulatory Review of Probabilistic Safety Assessment (PSA) Level 1, which gives advice for the review of Level 1 PSA for initiating events occurring at power plants. This TECDOC extends the coverage to address the regulatory review of Level 2 PSA.These publications are intended to provide guidance to regulatory authorities on how to review the PSA for a nuclear power plant to gain confidence that it has been carried out to an acceptable level of quality so that it can be used as the

  6. A measurement tool to assess culture change regarding patient safety in hospital obstetrical units.

    Science.gov (United States)

    Kenneth Milne, J; Bendaly, Nicole; Bendaly, Leslie; Worsley, Jill; FitzGerald, John; Nisker, Jeff

    2010-06-01

    Clinical error in acute care hospitals can only be addressed by developing a culture of safety. We sought to develop a cultural assessment survey (CAS) to assess patient safety culture change in obstetrical units. Interview prompts and a preliminary questionnaire were developed through a literature review of patient safety and "high reliability organizations," followed by interviews with members of the Managing Obstetrical Risk Efficiently (MOREOB) Program of the Society of Obstetricians and Gynaecologists of Canada. Three hundred preliminary questionnaires were mailed, and 21 interviews and 9 focus groups were conducted with the staff of 11 hospital sites participating in the program. To pilot test the CAS, 350 surveys were mailed to staff in participating hospitals, and interviews were conducted with seven nurses and five physicians who had completed the survey. Reliability analysis was conducted on four units that completed the CAS prior to and following the implementation of the first MOREOB module. Nineteen values and 105 behaviours, practices, and perceptions relating to patient safety were identified and included in the preliminary questionnaire, of which 143 of 300 (47.4%) were returned. Among the 220 cultural assessment surveys returned (62.9%), six cultural scales emerged: (1) patient safety as everyone's priority; (2) teamwork; (3) valuing individuals; (4) open communication; (5) learning; and (6) empowering individuals. The reliability analysis found all six scales to have internal reliability (Cronbach alpha), ranging from 0.72 (open communication) to 0.84 (valuing individuals). The CAS developed for this study may enable obstetrical units to assess change in patient safety culture.

  7. Results of 6th Review Meeting and Perspective of the 7th Review Meeting of the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    Lee, Sukho; Kim, Manwoong; You, Jeongwon; Lee, Youngeal

    2017-01-01

    This paper highlighted the objective and role of the Convention on Nuclear Safety organized by the IAEA. The Convention provides Member States to demonstrate and share how to maintain and improve the level of nuclear safety. The results of the 6 th review meeting were implemented for safety improvements and to prepare for 7 th national report. Seven and a half months before the 7 th Review Meeting, the National Report has submitted on steps and measures taken to implement Convention obligations. The Contracting Parties reviewed each other’s reports, and exchanged written questions, written answers and comments. The discussions in the Country Group sessions were generally good with a lively and frank exchange of information. The Country Groups noted the significant measures taken by Contracting Parties to improve nuclear safety and identified a number of good practices to be shared with all Contracting Parties.

  8. Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report

    International Nuclear Information System (INIS)

    Peterson, L.R.; Preston-Smith, J.; Savage, J.W.; Rousseau, W.F.

    1981-01-01

    A human factors engineering preliminary design review of the Shoreham control room was performed at the site on March 30 through April 3, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The presented sections are numbered to conform to the guidelines of the draft version of NUREG-0700. They summarize the teams's observations of the control room design and layout, and of the control room operators' interface with the control room environment

  9. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2011-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views [fr

  10. Guidelines regarding the review process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2002-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  11. Guidelines regarding the review process under the convention on nuclear safety

    International Nuclear Information System (INIS)

    1998-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing national reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of national reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  12. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2011-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  13. Guidelines regarding the review process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    1999-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing national reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of national reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views

  14. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2011-01-01

    These guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views [es

  15. The Cosmetic Ingredient Review Program-Expert Safety Assessments of Cosmetic Ingredients in an Open Forum.

    Science.gov (United States)

    Boyer, Ivan J; Bergfeld, Wilma F; Heldreth, Bart; Fiume, Monice M; Gill, Lillian J

    The Cosmetic Ingredient Review (CIR) is a nonprofit program to assess the safety of ingredients in personal care products in an open, unbiased, and expert manner. Cosmetic Ingredient Review was established in 1976 by the Personal Care Products Council (PCPC), with the support of the US Food and Drug Administration (USFDA) and the Consumer Federation of America (CFA). Cosmetic Ingredient Review remains the only scientific program in the world committed to the systematic, independent review of cosmetic ingredient safety in a public forum. Cosmetic Ingredient Review operates in accordance with procedures modeled after the USFDA process for reviewing over-the-counter drugs. Nine voting panel members are distinguished, such as medical professionals, scientists, and professors. Three nonvoting liaisons are designated by the USFDA, CFA, and PCPC to represent government, consumer, and industry, respectively. The annual rate of completing safety assessments accelerated from about 100 to more than 400 ingredients by implementing grouping and read-across strategies and other approaches. As of March 2017, CIR had reviewed 4,740 individual cosmetic ingredients, including 4,611 determined to be safe as used or safe with qualifications, 12 determined to be unsafe, and 117 ingredients for which the information is insufficient to determine safety. Examples of especially challenging safety assessments and issues are presented here, including botanicals. Cosmetic Ingredient Review continues to strengthen its program with the ongoing cooperation of the USFDA, CFA, the cosmetics industry, and everyone else interested in contributing to the process.

  16. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  17. Regulatory instrument review: Management of aging of LWR [light water reactor] major safety-related components

    International Nuclear Information System (INIS)

    Werry, E.V.

    1990-10-01

    This report comprises Volume 1 of a review of US nuclear plant regulatory instruments to determine the amount and kind of information they contain on managing the aging of safety-related components in US nuclear power plants. The review was conducted for the US Nuclear Regulatory Commission (NRC) by the Pacific Northwest Laboratory (PNL) under the NRC Nuclear Plant Aging Research (NPAR) Program. Eight selected regulatory instruments, e.g., NRC Regulatory Guides and the Code of Federal Regulations, were reviewed for safety-related information on five selected components: reactor pressure vessels, steam generators, primary piping, pressurizers, and emergency diesel generators. Volume 2 will be concluded in FY 1991 and will also cover selected major safety-related components, e.g., pumps, valves and cables. The focus of the review was on 26 NPAR-defined safety-related aging issues, including examination, inspection, and maintenance and repair; excessive/harsh testing; and irradiation embrittlement. The major conclusion of the review is that safety-related regulatory instruments do provide implicit guidance for aging management, but include little explicit guidance. The major recommendation is that the instruments be revised or augmented to explicitly address the management of aging

  18. Preliminary hazard analysis for the Brayton Isotope Ground Demonstration System (including vacuum test chamber)

    International Nuclear Information System (INIS)

    Miller, L.G.

    1975-01-01

    The Preliminary Hazard Analysis (PHA) of the BIPS-GDS is a tabular summary of hazards and undesired events which may lead to system damage or failure and/or hazard to personnel. The PHA reviews the GDS as it is envisioned to operate in the Vacuum Test Chamber (VTC) of the GDS Test Facility. The VTC and other equipment which will comprise the test facility are presently in an early stage of preliminary design and will undoubtedly undergo numerous changes before the design is frozen. The PHA and the FMECA to follow are intended to aid the design effort by identifying areas of concern which are critical to the safety and reliability of the BIPS-GDS and test facility

  19. Review of design criteria and safety analysis of safety class electric building for fuel test loop

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.

    1998-02-01

    Steady state fuel test loop will be equipped in HANARO to obtain the development and betterment of advanced fuel and materials through the irradiation tests. HANARO fuel test loop was designed for CANDU and PWR fuel testing. Safety related system of Fuel Test Loop such as emergency cooling water system, component cooling water system, safety ventilation system, high energy line break mitigation system and remote control room was required 1E class electric supply to meet the safety operation in accordance with related code. Therefore, FTL electric building was designed to construction and install the related equipment based on seismic category I. The objective of this study is to review the design criteria and analysis the safety function of safety class electric building for fuel test loop, and this results will become guidance for the irradiation testing in future. (author). 10 refs., 6 tabs., 30 figs.

  20. An approach for Periodic Safety Review (PSR) of units 5 and 6 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Kichev, Emil

    2014-01-01

    Periodic Safety Reviews (PSR) is complementary to the routine and special safety reviews and does not replaced them. It determines the level of compliance with current safety requirements and covers all safety aspects of NPP operation and all equipment (SSCs) on site. Three levels of importance are defined for the documents in PSR (towards higher conservatism): Bulgarian documents; IAEA documents; Documents of manufactures and suppliers of the equipment (SSCs). The scope and activities consists of four stages and includes 14 safety factors (SF). Cooperation with external companies and organizations in areas with proved experience is used.

  1. A Review of Interventions To Increase Driving Safety among Teenage Drivers.

    Science.gov (United States)

    Mattox, John R., II

    Young drivers across the United States represent a persistent traffic safety problem. Many interventions have been imposed on these drivers but few studies have evaluated the impact of these interventions on risky behaviors or traffic safety measures. To fill this gap, a review was undertaken to examine the most rigorous methodological evaluations…

  2. Preliminary Assessment for the Effects of the External Hazard Factors on the Safety of NPPs

    International Nuclear Information System (INIS)

    Jin, So Beom; Hyun, Seung Gyu; Kim, Sang Yun; Lee, Sung Kyu; Hur, Youl

    2010-01-01

    The Ch.etsu Offshore Earthquake(2007.7.16) in Japan caused damage to the Kashiwazaki-Kariwa(K-K) Nuclear Power Plants (NPPs) with seismic ground motion that exceeded the design level. This incident drew the interest of the safety evaluation studies for NPPs subjected to earthquakes exceeding the design basis around the world. Also, the Indian Ocean Tsunami(2004.12.26) tripped the Madras NPP by reason of flooding of the intake pump house and inundated the construction site of a fast breeder reactor site in India. In addition, from the various man-made and natural hazards such as the oil spill accident near Mallipo, Taean, Chungnam (2007.12), the forest fire near the Ulchin NPP site, the several inflows of marine organism into the intake of the Ulchin NPP, it was confirmed that the safety of NPPs may be affected by natural and human induced disasters. Intergovernmental Panel on Climate Change (IPCC) has been warned about global warming; the average temperature rose about 1.5 .deg. C during the 20th century and the damages caused by typhoons and heavy rains have also increased in Korea. Accordingly, a natural disaster prevention research team(hereafter team) ,which have been organized and operated since 2009, has assessed the impact of various hazards such as earthquakes and environmental changes due to global warming on the safety of NPP and has discussed to establish countermeasures. This paper introduces that the preliminary assessment for the effects of the external hazard factors on the safety of NPPs was conducted by the team

  3. SR-can: preliminary feedback to canister fabrication, repository design and future R and D

    International Nuclear Information System (INIS)

    Hedin, A.; Sellin, P.

    2007-01-01

    This paper discusses preliminary feedback from SKB's on-going safety assessment SR-Can, to he finalized in 2006. The assessment, which is not part of a formal licence application, is an important step towards the SR-Site assessment to be delivered in 2008 and which will support a licence application for a Swedish deep repository for spent nuclear fuel. The SR-Can assessment will use data from the initial stage of the on-going site investigations at the two candidate sites at Forsmark and Oskarshamn. Review comments on SR-Can from Swedish authorities are expected in the summer of 2007 and these will be taken into account when preparing the SR-Site assessment. An Interim version of the SR-Can report was produced in September 2004 and has been reviewed by the Swedish authorities supported by an international review team. The assessment concerns a KBS 3 repository for which the key safety related features can be summarised in the primary safety function isolation and the secondary function retardation. The isolation function is more prominent in the KBS 3 method compared to many other repository concepts. (authors)

  4. Safety of human papillomavirus vaccines: a review.

    Science.gov (United States)

    Stillo, Michela; Carrillo Santisteve, Paloma; Lopalco, Pier Luigi

    2015-05-01

    Between 2006 and 2009, two different human papillomavirus virus (HPV) vaccines were licensed for use: a quadrivalent (qHPVv) and a bivalent (bHPVv) vaccine. Since 2008, HPV vaccination programmes have been implemented in the majority of the industrialized countries. Since 2013, HPV vaccination has been part of the national programs of 66 countries including almost all countries in North America and Western Europe. Despite all the efforts made by individual countries, coverage rates are lower than expected. Vaccine safety represents one of the main concerns associated with the lack of acceptance of HPV vaccination both in the European Union/European Economic Area and elsewhere. Safety data published on bivalent and quadrivalent HPV vaccines, both in pre-licensure and post-licensure phase, are reviewed. Based on the latest scientific evidence, both HPV vaccines seem to be safe. Nevertheless, public concern and rumors about adverse events (AE) represent an important barrier to overcome in order to increase vaccine coverage. Passive surveillance of AEs is an important tool for detecting safety signals, but it should be complemented by activities aimed at assessing the real cause of all suspect AEs. Improved vaccine safety surveillance is the first step for effective communication based on scientific evidence.

  5. IAEA-led Operational Safety Team Reviews Dukovany Nuclear Power Plant, Czech Republic

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has commended the Dukovany Nuclear Power Plant (NPP) in the Czech Republic for its safety practices and has also made a series of recommendations to reinforce them. The IAEA assembled an international team of experts at the request of the Government of the Czech Republic to conduct an Operational Safety Review (OSART) of Dukovany NPP. Under the leadership of the IAEA's Division of Nuclear Installation Safety in Vienna, the OSART team performed an in-depth operational safety review of the plant from 6 to 23 June 2011. The team was made up of experts from Armenia, Germany, Hungary, Romania, Slovenia, Sweden, the UK and the USA. An OSART mission is designed as a review of programmes and activities essential to operational safety. It is not a regulatory inspection, nor is it a design review or a substitute for an exhaustive assessment of the plant's overall safety status. The team at Dukovany conducted an in-depth review of the aspects essential to the safe operation of the NPP, which is largely under the control of the site management. The conclusions of the review are based on the IAEA's Safety Standards and proven good international practices. The review covered the areas of Management, Organization and Administration; Training and Qualification; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry; and Emergency Planning and Preparedness. The OSART team has identified good plant practices, which will be shared with the rest of the nuclear industry for consideration of their application. Examples include: The plant uses an integrated approach to recruit, select, psychologically assess and train new employees. This approach has resulted in consistently high success rates for licensed operator examinations and the identification of potential candidates for various plant departments; The performance

  6. Involving patients in patient safety programmes: A scoping review and consensus procedure by the LINNEAUS collaboration on patient safety in primary care.

    Science.gov (United States)

    Trier, Hans; Valderas, Jose M; Wensing, Michel; Martin, Helle Max; Egebart, Jonas

    2015-09-01

    Patient involvement has only recently received attention as a potentially useful approach to patient safety in primary care. To summarize work conducted on a scoping review of interventions focussing on patient involvement for patient safety; to develop consensus-based recommendations in this area. Scoping review of the literature 2006-2011 about methods and effects of involving patients in patient safety in primary care identified evidence for previous experiences of patient involvement in patient safety. This information was fed back to an expert panel for the development of recommendations for healthcare professionals and policy makers. The scoping review identified only weak evidence in support of the effectiveness of patient involvement. Identified barriers included a number of patient factors but also the healthcare workers' attitudes, abilities and lack of training. The expert panel recommended the integration of patient safety in the educational curricula for healthcare professionals, and expected a commitment from professionals to act as first movers by inviting and encouraging the patients to take an active role. The panel proposed a checklist to be used by primary care clinicians at the point of care for promoting patient involvement. There is only weak evidence on the effectiveness of patient involvement in patient safety. The recommendations of the panel can inform future policy and practice on patient involvement in safety in primary care.

  7. End of mission report on seismic safety review mission for Belene NPP site

    International Nuclear Information System (INIS)

    Gurpinar, A.; Mohammadioun, B.; Schneider, H.; Serva, L.

    1995-01-01

    Upon the invitation of the Bulgarian government through the Committee for the Peaceful Uses of Atomic Energy and within the framework of the implementation of the Technical Cooperation project BUL/9/012 related to site and seismic of NPPs, a mission visited Sofia 3 - 7 July 1995. The mission constituted a follow-up of the interim review of subjects related to tectonic stability and seismic hazard characterization of the site which was performed in September 1993. The main objective of the mission was the final review of the subjects already reviewed in September 1993 as well as issues related to geotechnical engineering and foundation safety. The main terms of reference of the present mission was to verify the implementation of the recommendations of the Site Safety Review Mission of June 1990. This document gives findings on geology-tectonics, seismology and foundation safety. In the end conclusions and recommendations of the mission are presented

  8. IAEA activities to prepare safety codes and guides for thermal neutron nuclear power plants

    International Nuclear Information System (INIS)

    Iansiti, E.

    1977-01-01

    In accordance with the programme presented to, and endorsed by, the eighteenth General Conference in September 1974, the IAEA is now developing a complete set of safety codes and guides that will represent recommendations for the safety of thermal neutron power plants. The safety codes outline the minimum requirements for achieving this safety, and the safety guides set forth the criteria, procedures and methods to implement the safety codes. The whole programme is directed towards the five areas of Governmental Organization, Siting, Design, Operation, and Quality Assurance. One Scientific Secretary from the Agency Secretariat is responsible for each of these areas and a Co-ordinator takes care of common problems. For the development of each of these documents a working group of a few world experts is first convened which prepare a preliminary draft. This draft is then reviewed by a larger, international Technical Review Committee (one for each of the five areas) and a subsequent review by the Senior Advisory Group - with representatives from 20 states - ensures that the document is well coordinated within the programme. At this stage, it is sent to Member States for comments. The Technical Review Committee concerned is reconvened to integrate these comments into the document, and, after a final review by the Senior Advisory Group, the document is ready for transmission to the Director General of the Agency for endorsement and publication. A preliminary to this procedure is the collation by the Secretariat of large amounts of information submitted by Member States so that the first draft is really based on a very complete knowledge of what is done in each area all over the world. This collation frequently reveals differences in approach which are not random but due, rather, to the local conditions and the types of reactors. These differences must be harmonized in the documents produced without detracting from the effectiveness of the code or guide. The whole

  9. Development of a draft of human factors safety review procedures for the Korean next generation reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Moon, B. S.; Park, J. C.; Lee, Y. H.; Oh, I. S.; Lee, H. C. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-02-01

    In this study, a draft of human factors engineering (HFE) safety review procedures (SRP) was developed for the safety review of KNGR based on HFE Safety and Regulatory Requirements and Guidelines (SRRG). This draft includes acceptance criteria, review procedure, and evaluation findings for the areas of review including HFE Program Management, Human Factors Analyses, Human Factors Design, and HFE Verification and Validation, based on Section 15.1 'Human Factors Engineering Design Process' and 15.2 'Control Room Human Factors Engineering' of KNGR Specific Safety Requirements and Chapter 15 'Human Factors Engineering' of KNGR Safety Regulatory Guides. For the effective review, human factors concerns or issues related to advanced HSI design that have been reported so far should be extensively examined. In this study, a total of 384 human factors issues related to the advanced HSI design were collected through our review of a total of 145 documents. A summary of each issue was described and the issues were identified by specific features of HSI design. These results were implemented into a database system. 8 refs., 2 figs. (Author)

  10. Passenger safety, health, and comfort: a review.

    Science.gov (United States)

    Rayman, R B

    1997-05-01

    Since the birth of aviation medicine approximately 80 yrs ago, practitioners and scientists have given their attention primarily to flight deck crew, cabin crew, and ground support personnel. However, in more recent years we have broadened our horizons to include the safety, health, and comfort of passengers flying commercial aircraft. This will be even more compelling as more passengers take to the air in larger aircraft and flying longer hours to more distant destinations. Further, we can expect to see more older passengers because people in many countries are living longer, healthier lives. The author first discusses the stresses imposed by ordinary commercial flight upon travelers such as airport tumult, barometric pressure changes, immobility, jet lag, noise/ vibration, and radiation. Medical considerations are next addressed describing inflight illness and medical care capability aboard U.S. air carriers. Passenger safety, cabin air quality, and the preventive medicine aspects of air travel are next reviewed in the context of passenger safety, health, and comfort. Recommendations are addressed to regulator agencies, airlines aircraft manufacturers, and the aerospace medicine community.

  11. A Systematic Review of the Safety of Lisdexamfetamine Dimesylate

    OpenAIRE

    Coghill, David R.; Caballero, Beatriz; Sorooshian, Shaw; Civil, Richard

    2014-01-01

    Background Here we review the safety and tolerability profile of lisdexamfetamine dimesylate (LDX), the first long-acting prodrug stimulant for the treatment of attention-deficit/hyperactivity disorder (ADHD). Methods A PubMed search was conducted for English-language articles published up to 16 September 2013 using the following search terms: (lisdexamfetamine OR lisdexamphetamine OR SPD489 OR Vyvanse OR Venvanse OR NRP104 NOT review [publication type]). Results In short-term, parallel-group...

  12. Deep repository for long-lived low- and intermediate-level waste. Preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-01

    A preliminary safety assessment has been performed of a deep repository for long-lived low- and intermediate-level waste, SFL 3-5. The purpose of the study is to investigate the capacity of the facility to act as a barrier to the release of radionuclides and toxic pollutants, and to shed light on the importance of the location of the repository site. A safety assessment (SR 97) of a deep repository for spent fuel has been carried out at the same time. In SR 97, three hypothetical repository sites have been selected for study. These sites exhibit fairly different conditions in terms of hydrogeology, hydrochemistry and ecosystems. To make use of information and data from the SR 97 study, we have assumed that SFL 3-5 is co-sited with the deep repository for spent fuel. A conceivable alternative is to site SFL 3-5 as a completely separate repository. The focus of the SFL 3-5 study is a quantitative analysis of the environmental impact for a reference scenario, while other scenarios are discussed and analyzed in more general terms. Migration in the repository's near- and far-field has been taken into account in the reference scenario. Environmental impact on the three sites has also been calculated. The calculations are based on an updated forecast of the waste to be disposed of in SFL 3-5. The forecast includes radionuclide content, toxic metals and other substances that have a bearing on a safety assessment. The safety assessment shows how important the site is for safety. Two factors stand out as being particularly important: the water flow at the depth in the rock where the repository is built, and the ecosystem in the areas on the ground surface where releases may take place in the future. Another conclusion is that radionuclides that are highly mobile and long-lived, such as {sup 36}Cl and {sup 93}Mo , are important to take into consideration. Their being long-lived means that barriers and the ecosystems must be regarded with a very long time horizon.

  13. Food Safety Evaluation Based on Near Infrared Spectroscopy and Imaging: A Review.

    Science.gov (United States)

    Fu, Xiaping; Ying, Yibin

    2016-08-17

    In recent years, due to the increasing consciousness of food safety and human health, much progress has been made in developing rapid and nondestructive techniques for the evaluation of food hazards, food authentication, and traceability. Near infrared (NIR) spectroscopy and imaging techniques have gained wide acceptance in many fields because of their advantages over other analytical techniques. Following a brief introduction of NIR spectroscopy and imaging basics, this review mainly focuses on recent NIR spectroscopy and imaging applications for food safety evaluation, including (1) chemical hazards detection; (2) microbiological hazards detection; (3) physical hazards detection; (4) new technology-induced food safety concerns; and (5) food traceability. The review shows NIR spectroscopy and imaging to be effective tools that will play indispensable roles for food safety evaluation. In addition, on-line/real-time applications of these techniques promise to be a huge growth field in the near future.

  14. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2013-01-01

    These Guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 of the Convention and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views. [fr

  15. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2013-01-01

    These Guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 of the Convention and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views.

  16. Guidelines regarding the Review Process under the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    2013-01-01

    These Guidelines, established by the Contracting Parties pursuant to Article 22 of the Convention, are intended to be read in conjunction with the text of the Convention. Their purpose is to provide guidance to the Contracting Parties on the process for reviewing National Reports submitted in accordance with Article 5 of the Convention and thereby to facilitate the efficient review of implementation by the Contracting Parties of their obligations under the Convention. The aim of the review process should be to achieve a thorough examination of National Reports submitted in accordance with Article 5 of the Convention, so that Contracting Parties can learn from each other's solutions to common and individual nuclear safety problems and, above all, contribute to improving nuclear safety worldwide through a constructive exchange of views. [es

  17. A review of the probabilistic safety assessment application to the TR-2 research reactor

    International Nuclear Information System (INIS)

    Goektepe, G.; Adalioglu, U.; Anac, H.; Sevdik, B.; Menteseoglu, S.

    2001-01-01

    A review of the Probabilistic Safety Assessment (PSA) to the TR-2 Research Reactor is presented. The level 1 PSA application involved: selection of accident initiators, mitigating functions and system definitions, event tree constructions and quantification, fault tree constructions and quantification, human reliability, component failure data base development, dependent failure analysis. Each of the steps of the analysis given above is reviewed briefly with highlights from the selected results. PSA application is found to be a practical tool for research reactor safety due to intense involvement of human interactions in an experimental facility. Insights gained from the application of PSA methodology to the TR-2 research reactor led to a significant safety review of the system

  18. Narcissism and consumer behaviour: a review and preliminary findings

    Science.gov (United States)

    Cisek, Sylwia Z.; Sedikides, Constantine; Hart, Claire M.; Godwin, Hayward J.; Benson, Valerie; Liversedge, Simon P.

    2014-01-01

    We review the literature on the relation between narcissism and consumer behavior. Consumer behavior is sometimes guided by self-related motives (e.g., self-enhancement) rather than by rational economic considerations. Narcissism is a case in point. This personality trait reflects a self-centered, self-aggrandizing, dominant, and manipulative orientation. Narcissists are characterized by exhibitionism and vanity, and they see themselves as superior and entitled. To validate their grandiose self-image, narcissists purchase high-prestige products (i.e., luxurious, exclusive, flashy), show greater interest in the symbolic than utilitarian value of products, and distinguish themselves positively from others via their materialistic possessions. Our review lays the foundation for a novel methodological approach in which we explore how narcissism influences eye movement behavior during consumer decision-making. We conclude with a description of our experimental paradigm and report preliminary results. Our findings will provide insight into the mechanisms underlying narcissists’ conspicuous purchases. They will also likely have implications for theories of personality, consumer behavior, marketing, advertising, and visual cognition. PMID:24711797

  19. Narcissism and consumer behaviour: a review and preliminary findings.

    Science.gov (United States)

    Cisek, Sylwia Z; Sedikides, Constantine; Hart, Claire M; Godwin, Hayward J; Benson, Valerie; Liversedge, Simon P

    2014-01-01

    We review the literature on the relation between narcissism and consumer behavior. Consumer behavior is sometimes guided by self-related motives (e.g., self-enhancement) rather than by rational economic considerations. Narcissism is a case in point. This personality trait reflects a self-centered, self-aggrandizing, dominant, and manipulative orientation. Narcissists are characterized by exhibitionism and vanity, and they see themselves as superior and entitled. To validate their grandiose self-image, narcissists purchase high-prestige products (i.e., luxurious, exclusive, flashy), show greater interest in the symbolic than utilitarian value of products, and distinguish themselves positively from others via their materialistic possessions. Our review lays the foundation for a novel methodological approach in which we explore how narcissism influences eye movement behavior during consumer decision-making. We conclude with a description of our experimental paradigm and report preliminary results. Our findings will provide insight into the mechanisms underlying narcissists' conspicuous purchases. They will also likely have implications for theories of personality, consumer behavior, marketing, advertising, and visual cognition.

  20. Narcissism and Consumer Behaviour: A Review and Preliminary Findings

    Directory of Open Access Journals (Sweden)

    Sylwia Z Cisek

    2014-03-01

    Full Text Available We review the literature on the relation between narcissism and consumer behaviour. Consumer behaviour is sometimes guided by self-related motives (e.g., self-enhancement rather than by rational economic considerations. Narcissism is a case in point. This personality trait reflects a self-centred, self-aggrandizing, dominant, and manipulative orientation. Narcissists are characterised by exhibitionism and vanity, and they see themselves as superior and entitled. To validate their grandiose self-image, narcissists purchase high-prestige products (i.e., luxurious, exclusive, flashy, show greater interest in the symbolic than utilitarian value of products, and distinguish themselves positively from others via their materialistic possessions. Our review lays the foundation for a novel methodological approach in which we explore how narcissism influences eye movement behaviour during consumer decision-making. We conclude with a description of our experimental paradigm and report preliminary results. Our findings will provide insight into the mechanisms underlying narcissists’ conspicuous purchases. They will also likely have implications for theories of personality, consumer behaviour, marketing, advertising, and visual cognition.

  1. Nuclear Safety Review for the Year 2006

    International Nuclear Information System (INIS)

    2007-07-01

    the various stakeholders effectively and efficiently. Related to this is the need for operators, users and regulatory bodies to communicate with the public effectively and in an open and transparent manner. The global nature of safety is reflected in the relevant international instruments, including conventions and codes of conduct, currently in place. All the international conventions related to safety welcomed additional contracting parties in 2006. During the year, the second review meeting took place for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. The newly established Integrated Regulatory Review Service (IRRS) is contributing to the enhancement of Member States' legislative and regulatory infrastructure and the harmonization of regulatory approaches in nuclear, radiation, radioactive waste and transport safety. It is also one of the most effective feedback tools on the application of Agency standards that will be used for the further improvement of existing standards and guidance. In addition, the approach evaluates not only the policies and strategies, but also how efficient and effective they are regarding protection against all types of exposure. Therefore it is also a tool for information sharing and mutual learning on good policies and practices that can be used to reach harmonization step by step. Overall, the safety performance of the nuclear industry is good. However, there continue to be recurring events and there is a need to maintain vigilance. There is also a need for lessons learned to be transferred across the various sectors of the nuclear industry. Strong safety management and safety culture are vitally important for the continuation of this good performance. Leaders must ensure that personnel are properly trained and that adequate resources are available. The nuclear power industry around the world remains a safe and sound one with no worker or member of the public receiving a

  2. Research oil guidelines for safety review of category 2 waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Safety confirmation items and monitoring items for engineered barriers were compiled, considering the current technical status and monitoring plan for the simulated subsurface disposal and its test facilities. In order to develop the guidelines of the safety review for the disposal of LLW generated from RI facilities and research facilities, technical issues relating toxic substances were surveyed. (author)

  3. Creation and preliminary validation of the screening for self-medication safety post-stroke scale (S-5).

    Science.gov (United States)

    Kaizer, Franceen; Kim, Angela; Van, My Tram; Korner-Bitensky, Nicol

    2010-03-01

    Patients with stroke should be screened for safety prior to starting a self-medication regime. An extensive literature review revealed no standardized self-medication tool tailored to the multi-faceted needs of the stroke population. The aim of this study was to create and validate a condition-specific tool to be used in screening for self-medication safety in individuals with stroke. Items were generated using expert consultation and review of the existing tools. The draft tool was pilot-tested on expert stroke clinicians to receive feedback on content, clarity, optimal cueing and domain omissions. The final version was piloted on patients with stroke using a structured interviewer-administered interview. The tool was progressively refined and validated according to feedback from the 11 expert reviewers. The subsequent version was piloted on patients with stroke. The final version includes 16 questions designed to elicit information on 5 domains: cognition, communication, motor, visual-perception and, judgement/executive function/self-efficacy. The Screening for Safe Self-medication post-Stroke Scale (S-5) has been created and validated for use by health professionals to screen self-medication safety readiness of patients after stroke. Its use should also help to guide clinicians' recommendations and interventions aimed at enhancing self-medication post-stroke.

  4. Russian MINATOM nuclear safety research strategic plan. An international review

    International Nuclear Information System (INIS)

    1999-03-01

    The 'Safety Research Strategic Plan for Russian Nuclear Power Plants' was published in draft form at the Russian International Nuclear Safety Centre (RINSC) by a working group of fifteen senior Russian experts. The Plan consists of 12 chapters, each addressing a specific technical area and containing a number of proposed research programmes and projects to advance the state-of-knowledge in that area. In part because a strong Recommendation to undertake such a Plan was made by the 1998 OECD/NEA study, the OECD Nuclear Energy Agency was asked by the Director of RINSC and the Director of USINSC to organize an international review of the Plan when the English-language version became available in October, 1998. This report represents the results of that review. (R.P.)

  5. A Systematic Review of the Use of Social Media for Food Safety Risk Communication.

    Science.gov (United States)

    Overbey, Katie N; Jaykus, Lee-Ann; Chapman, Benjamin J

    2017-09-01

    This article covers the current published literature related to the use of social media in food safety and infectious disease communication. The aim was to analyze literature recommendations and draw conclusions about how best to utilize social media for food safety risk communication going forward. A systematic literature review was conducted, and 24 articles were included for analysis. The inclusion criteria were (i) original peer-reviewed articles and (ii) primary focus on communication through social media about food safety and/or infectious diseases. Studies were coded for themes about social media applications, benefits, limitations, and best practices. Trust and personal beliefs were important drivers of social media use. The wide reach, immediacy, and information gathering capacities of social media were frequently cited benefits. Suggestions for social media best practices were inconsistent among studies, and study designs were highly variable. More evidence-based suggestions are needed to better establish guidelines for social media use in food safety and infectious disease risk communication. The information gleaned from this review can be used to create effective messages for shaping food safety behaviors.

  6. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1988-01-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  7. Standard review plan for the review of a license application for a low-level radioactive waste disposal facility: Safety analysis report

    International Nuclear Information System (INIS)

    1987-01-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff's review process by interested members of the public and the nuclear power industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission's regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements

  8. International review of Kursk unit 1 in-depth safety analysis report

    International Nuclear Information System (INIS)

    Chouha, M.; Bolshov, L.; Butcher, P.; Janke, R.; Parsons, T.; Weber, J.P.

    2004-01-01

    The paper presents the objectives, organisation, main findings and conclusions of the international review of the Kursk unit 1 safety analysis report (K1IRSR). The K1IRSR was administered by RISKAUDIT IRSN/GRS international and carried out by international experts from 7 western countries plus the Russian Federation, under the supervision of the safety review group (SRG) of the European bank for reconstruction and development (EBRD). The project was financed by the nuclear safety account (NSA) administered by the EBRD. The Russian experts worked under a contract with IBRAE financed by Rosenergoatom. The main conclusions were that the SAR followed a correct approach, broadly in line with Russian and international guidance documents, but needed improvement in structure and content. It established that the safety level of the unit has been increased significantly by the modernisation programme. The important deviations of the unit from current Russian regulations and the IAEA safety issues for RBMK are either fully resolved or are being addressed to the extent possible by compensatory measures to further reduce the risk. The K1IRSR experts have made a number of recommendations for improvement of the K1SAR. The authors agreed to take the recommendations into account in future revision of the K1SAR. (orig.)

  9. Review of Radiation Safety in Medical X-Ray Diagnosis

    International Nuclear Information System (INIS)

    Koteng, O.A.

    2015-01-01

    Medical X-Ray machines have been used for more than a century for non-invasive diagnosis of patients for the benefit of mankind. The safety of operators and patients during such practice has improved with time, but, still cases of detrimental effects to Radiation Workers in Kenya including cancer related deaths have been reported in the recent past. An ongoing study is reviewing the safety status of the worker and patients during medical and dental exposures. The study was initiated following complaint of recurrent headaches by a radiographer working in a busy Kenyan hospital. (author)

  10. New graduate registered nurses' knowledge of patient safety and practice: A literature review.

    Science.gov (United States)

    Murray, Melanie; Sundin, Deborah; Cope, Vicki

    2018-01-01

    To critically appraise available literature and summarise evidence pertaining to the patient safety knowledge and practices of new graduate registered nurses. Responsibility for patient safety should not be limited to the practice of the bedside nurses, rather the responsibility of all in the healthcare system. Previous research identified lapses in safety across the health care, more specifically with new practitioners. Understanding these gaps and what may be employed to counteract them is vital to ensuring patient safety. A focused review of research literature. The review used key terms and Boolean operators across a 5-year time frame in CINAHL, Medline, psycINFO and Google Scholar for research articles pertaining to the area of enquiry. Eighty-four articles met the inclusion criteria, 39 discarded due to irrelevant material and 45 articles were included in the literature review. This review acknowledges that nursing has different stages of knowledge and practice capabilities. A theory-practice gap for new graduate registered nurses exists, and transition to practice is a key learning period setting new nurses on the path to becoming expert practitioners. Within the literature, there was little to no acknowledgement of patient safety knowledge of the newly registered nurse. Issues raised in the 1970s remain a concern for today's new graduate registered nurses. Research has recognised several factors affecting transition from nursing student to new graduate registered nurse. These factors are leaving new practitioners open to potential errors and risking patient safety. Understanding the knowledge of a new graduate registered nurse upon entering clinical practice may assist in organisations providing appropriate clinical and theoretical support to these nurses during their transition. © 2017 John Wiley & Sons Ltd.

  11. Design review report for rotary mode core sample truck (RMCST) modifications for flammable gas tanks, preliminary design

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1996-02-01

    This report documents the completion of a preliminary design review for the Rotary Mode Core Sample Truck (RMCST) modifications for flammable gas tanks. The RMCST modifications are intended to support core sampling operations in waste tanks requiring flammable gas controls. The objective of this review was to validate basic design assumptions and concepts to support a path forward leading to a final design. The conclusion reached by the review committee was that the design was acceptable and efforts should continue toward a final design review

  12. The safety of bone allografts used in dentistry: a review.

    Science.gov (United States)

    Holtzclaw, Dan; Toscano, Nicholas; Eisenlohr, Lisa; Callan, Don

    2008-09-01

    Recent media reports concerning "stolen body parts" have shaken the public's trust in the safety of and the use of ethical practices involving human allografts. The authors provide a comprehensive review of the safety aspects of human bone allografts. The authors reviewed U.S. government regulations, industry standards, independent industry association guidelines, company guidelines and scientific articles related to the use of human bone allografts in the practice of dentistry published in the English language. The use of human bone allografts in the practice of dentistry involves the steps of procurement, processing, use and tracking. Rigorous donor screening and aseptic proprietary processing programs have rendered the use of human bone allografts safe and effective as a treatment option. When purchasing human bone allografts for the practice of dentistry, one should choose products accredited by the American Association of Tissue Banks for meeting uniformly high safety and quality control measures. Knowledge of human bone allograft procurement, processing, use and tracking procedures may allow dental clinicians to better educate their patients and address concerns about this valuable treatment option.

  13. Effectiveness of public health interventions in food safety: a systematic review.

    Science.gov (United States)

    Campbell, M E; Gardner, C E; Dwyer, J J; Isaacs, S M; Krueger, P D; Ying, J Y

    1998-01-01

    To summarize evidence on the effectiveness of public health interventions regarding food safety at restaurants, institutions, homes and other community-based settings. This systematic review of published and unpublished studies involved a comprehensive literature search, screening for relevance, quality assessment of relevant studies, data extraction and synthesis. The interventions identified in 15 studies included in this review were grouped into three categories: inspections, food handler training, and community-based education. The evidence suggests that: routine inspection (at least once per year) of food service premises is effective in reducing the risk of foodborne illness; food handler training can improve the knowledge and practices of food handlers; and selected community-based education programs can increase public knowledge of food safety. There is some evidence for the effectiveness of multiple public health interventions on food safety. Future research needs include evaluation of HACCP and community-based education programs.

  14. Idaho National Laboratory Integrated Safety Management System 2010 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Thomas J. Haney

    2010-12-01

    Idaho National Laboratory completes an annual Integrated Safety Management System effectiveness review per 48 CFR 970.5223-1 “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assesses ISMS effectiveness, provides feedback to maintain system integrity, and helps identify target areas for focused improvements and assessments for the following year. Using one of the three Department of Energy (DOE) descriptors in DOE M 450.4-1 regarding the state of ISMS effectiveness during Fiscal Year (FY) 2010, the information presented in this review shows that INL achieved “Effective Performance.”

  15. Nuclear Safety Review for the Year 2008

    International Nuclear Information System (INIS)

    2009-07-01

    Nuclear technologies are increasingly seen as important solutions for meeting a number of challenges. Enabling the peaceful use of nuclear technology to support global energy demands and other human needs must be accompanied by deliberate, internationally-coordinated actions to minimize the potential for nuclear accidents and terrorism. While in recent years, the safety performance of the nuclear industry has been good, it is important to avoid any complacency. The Agency continues to support and promote the global nuclear safety and security regime as a framework for worldwide achievement of high levels of safety and security in nuclear activities. In 2008, three general themes can be observed from the global trends, issues and challenges in nuclear safety: the continuous improvements in strengthening safety worldwide through international cooperation; an expected increase of new entrant nuclear power programmes and the expansion of existing programmes; and safety and security synergy. Regarding continuous improvements to strengthen safety worldwide, the focus was on operating experience feedback and knowledge networking; and self-assessment and peer review. In the areas of new entrant nuclear programmes and expansion of existing nuclear programmes, activities centred on national safety infrastructures; human resources and capacity building; regulatory independence; nuclear incident and emergency preparedness and response; spent fuel and radioactive waste management; and multinational aspects of nuclear activities. In the area of safety and security synergy, in 2008 there was increasing awareness that processes need to be in place to ensure that safety activities do not compromise security and vice versa. As outlined in Safety Fundamentals No. SF-1, the prime responsibility for safety must rest with the person or organization responsible for facilities and activities that give rise to radiation risks. An effective legal and governmental framework for safety

  16. The value of peer reviews to nuclear plant safety

    International Nuclear Information System (INIS)

    Subalusky, W.T. Jr.

    1994-01-01

    On a global basis, the nuclear utility industry has clearly demonstrated the value of peer reviews for improving nuclear safety and overall plant performance. Peer reviews are conducted by small teams of technical experts who review various aspects of plant operation, recognize strengths and recommend improvements, thereby stimulating a positive response to the recommendations. U.S. nuclear utilities initiated the operator-to-operator peer review process first through the Institute of Nuclear Power Operations (INPO). Now, voluntary peer reviews are an important activity of the World Association of Nuclear Operators (WANO). Formed just five years ago. WANO has made significant progress in its key activities of the operator-to-operator exchanges, operating experience exchange, monitoring of plant performance indicators and sharing of good practices worldwide. A fifth activity, peer review on a strictly voluntary basis, is pertinent to this paper

  17. Nuclear safety review requirements for launch approval

    International Nuclear Information System (INIS)

    Sholtis, J.A. Jr.; Winchester, R.O.

    1992-01-01

    Use of nuclear power systems in space requires approval which is preceded by extensive safety analysis and review. This careful study allows an informed risk-benefit decision at the highest level of our government. This paper describes the process as it has historically been applied to U.S. isotopic power systems. The Ulysses mission, launched in October 1990, is used to illustrate the process. Expected variations to deal with reactor-power systems are explained

  18. Review of light water reactor safety through the Three Mile Island accident

    International Nuclear Information System (INIS)

    Phung, D.L.

    1984-05-01

    This review of light water reactor safety through the Three Mile Island accident has the purpose of establishing the baseline over which safety achievement post-TMI is assessed, and the need for new reactor designs and business direction is judged. Five major areas of reactor safety pre-TMI are examined: (1) safety philosophy and institutions, (2) reactor design criteria, (3) operational problems, (4) the Rasmussen reactor safety study, and (5) the TMI accident and repercussions. Although nuclear power has made spectacular achievements over the period pre-TMI and although TMI is technically a minor accident, this review concludes that there were basic flaws in the technology and in the manner safety philosophy was conceived and carried out. These flaws included (1) a reactor design that has high core power density, low heat capacity, and low system tolerance to upsets, (2) reactor deployment that had been expedited without extensive operational experience, (3) rules and regulations that had to play catch-up with commercial reactor development, (4) an industry that was fragmented, short-sighted, and tended to rely on the Nuclear Regulatory Commission for safety guidance, (5) information that was not effectively shared, and (6) attention that was inadequate to the human aspects of reactor operation and to public reaction to the specter of a reactor accident, major or minor

  19. EPR safety. Consideration of the internal and external hazards in the safety studies

    International Nuclear Information System (INIS)

    Gueguin, H.

    2008-04-01

    The author presents the main points of the Preliminary Safety Report of EDF on the EPR reactor safety. It concerns the considerations of the internal (fire, flood, explosions, pipes failures) and external (earthquakes, airplane falls, explosions, exceptional natural disasters, extreme meteorological conditions) damages. It presents how the safety report takes into account the aggression. (A.L.B.)

  20. From initial application to routine operation: Reviewing the Applications for Power Uprates

    International Nuclear Information System (INIS)

    Garis, Ninos; Skaanberg, Lars

    2007-01-01

    Current plans for power uprates in Swedish nuclear power plants will lead to significant increases in seven units and a lesser increase in one unit. To date SKI has received six applications, and two more are due in 2007. A power uprate process is initiated by the application to the Government by a licensee for approval to increase the thermal output of a reactor unit. This request is addressed to the Government and is forwarded to SKI for a preliminary safety review. The result of the review is then provided by SKI as a basis for a governmental decision. Six applications have been taken through the first stage of the process; of these, three have received governmental approval and three are currently awaiting a decision. If the licensee's application is approved by the Government, deeper analyses and studies are required in order to modify the plant and update the safety analysis report and the associated technical specifications. SKI reviews this material on a continuous basis prior to test and routine operation at the increased power level. There are four stages that require attention and review by SKI; 1. Review of the application to the Government for approval to operate at increased power levels, and preparation of a suitable answer. 2. Review and approval of the preliminary safety analysis report (PSAR) 3. Review and approval of the application for testing at the higher power level 4. Review and approval of routine operation at the higher power level. A thorough description of the handling of a power uprate process can be found in the SKI PM (SKI-PM 04:11) that is available on the SKI website (in Swedish)

  1. Nuclear Safety Review for the Year 2005

    International Nuclear Information System (INIS)

    2006-01-01

    In 2005, the Agency and its Director General were awarded the Nobel Peace Prize. The Nobel Committee statement recognizes the Agency's 'efforts to prevent nuclear energy from being used for military purposes and to ensure that nuclear energy for peaceful purposes is used in the safest possible way.' The global nature of safety is reflected in the relevant international legal instruments, both binding conventions and the non-binding codes of conduct currently in place. During the year, the third review meeting of the Contracting Parties to the Convention on Nuclear Safety as well as the third meeting of the representatives of the competent authorities under the Convention on Early Notification of a Nuclear Accident and Convention on Assistance in the Case of a Nuclear Accident or a Radiological Emergency took place. Improvements have been made in national legislation and regulatory infrastructure in many Member States in 2005. However, inadequate safety management and regulatory supervision of nuclear installations and use of ionizing radiation is a continuing issue in many Member States. A continuing challenge is to collect, analyse and disseminate safety experience and knowledge. Nuclear power plant (NPP) operational safety performance remained high throughout the world in 2005. Radiation doses to workers and members of the public due to NPP operation are well below regulatory limits. Personal injury accidents and incidents are among the lowest in industry. There were no accidents that resulted in the release of radiation that could adversely impact the environment. NPPs in many parts of the world have successfully coped with severe natural disaster conditions such as earthquakes, tsunamis, widespread river flooding and hurricanes. However, operational safety performance has been on a plateau for several years and concern has been expressed in many forums regarding the need to guard against complacency in the industry. Research reactors also maintained a good

  2. Safety review for seismic qualification on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  3. Modern diaper performance: construction, materials, and safety review.

    Science.gov (United States)

    Dey, Swatee; Kenneally, Dianna; Odio, Mauricio; Hatzopoulos, Ioannis

    2016-07-01

    A review of the literature on diapers and diaper rash reveals that many clinicians are unfamiliar with modern diaper construction and materials as well as diaper safety testing methods. Typical modern diapers do not contain ingredients of concern such as latex and disperse dyes, but use ingredients such as spandex and pigments with a favorable safety profile. Today's disposable diaper is a high performance product whose carefully designed layers and liners provide optimal urine and feces absorption and an ever more clothing-like and comfortable fit. This is possible due to a variety of specialized polymer materials that provide optimal absorption of urine and feces, thereby minimizing skin exposure. © 2016 The International Society of Dermatology.

  4. JET Tokamak, preparation of a safety case for tritium operations

    Energy Technology Data Exchange (ETDEWEB)

    Boyer, Helen, E-mail: helen.boyer@ccfe.ac.uk [CCFE, Culham Science Centre (United Kingdom); Plummer, David; Johnston, Jane [CCFE, Culham Science Centre (United Kingdom)

    2016-11-01

    Highlights: • A safety case incorporating technical and ITER related upgrades. • Hazard analysis reworked to include new modelling assessments. • Fitness for purpose assessment of safety controls. - Abstract: A new Safety Case is required to permit tritium operations on JET during the forthcoming DTE2 campaign. The outputs, benefits and lessons learned associated with the production of this Safety Case are presented. The changes that have occurred to the Safety Case methodology since the last JET tritium Safety Case are reviewed. Consideration is given to the effects of modifications, particularly ITER related changes, made to the JET and the impact these have on the hazard assessments as well as normal operations. Several specialized assessments, including recent MELCOR modelling, have been undertaken to support the production of this Safety Case and the impact of these assessments is outlined. Discussion of the preliminary actions being taken to progress implementation of this Safety Case is provided, highlighting new methods to improve the dissemination of the key Safety Case results to the plant operators. Finally, the work required to complete this Safety Case, before the next tritium campaign, is summarized.

  5. Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

    Energy Technology Data Exchange (ETDEWEB)

    Farren Hunt

    2011-12-01

    Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

  6. Sibutramine: efficacy and safety of prescribing in routine clinical practice

    Directory of Open Access Journals (Sweden)

    Tat'yana Ivanovna Romantsova

    2015-11-01

    Full Text Available The 17th European Congress of endocrinology was held in Dublin in May 2015. Within the section «Obesity» the preliminary results of the observational program "PRIMAVERA" in the form of an oral report were presented. This article presents a brief review of the literature, reflecting the issues of mechanism of action, efficacy and safety of sibutramine and also includes an extended version of the main provisions of the report.

  7. Revision of AESJ standard 'the code of implemnetation of periodic safety review of nuclear power plants'

    International Nuclear Information System (INIS)

    Hirano, Masashi; Narumiya, Yoshiyuki

    2010-01-01

    The Periodic Safety Review (PSR) was launched in June 1992, when the Agency for Natural Resources and Energy issued a notification that required licensees to conduct comprehensive review on the safety of each existing nuclear power plant (NPP) once approximately every ten years based on the latest technical findings for the purpose of improving the safety of the NPP. In 2006, the Standard Committee of the Atomic Energy Society of Japan established the first version of 'The Standard of Implementation for Periodic Safety Review of Nuclear Power Plants: 2006'. Taking into account developments in safety regulation of PSR after the issuance of the first version, the Standard Committee has revised the Standard. This paper summarizes background on PSR, such developments are major contents of the Standard as well as the focal points of the revision. (author)

  8. Human Factors Evaluation of Man-Machine Interface for Periodic Safety Review of Yonggwang Unit no. 1, 2

    International Nuclear Information System (INIS)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang

    2006-01-01

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Yonggwang Unit no. 1, 2. As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area

  9. Human Factors Evaluation of Man-Machine Interface for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the research results of human factors assessment on the MMI(Man Machine Interface) equipment as part of Periodic Safety Review(PSR) of Yonggwang Unit no. 1, 2. As MMI is a key factor among human factors to be reviewed in PSR, we reviewed the MMI components of nuclear power plants in aspect of human factors engineering. The availability, suitability, and effectiveness of the MMI devices were chosen to be reviewed. The MMI devices were investigated through the review of design documents related to the MMI, survey of control panels, evaluation of experts, and experimental assessment. Checklists were used to perform this assessment and record the review results. The items mentioned by the expert comments to review in detail in relation with task procedures were tested by experiments with operators' participation. For some questionable issues arisen during this MMI review, operator workload and possibility of errors in operator actions were analysed. The reviewed MMI devices contain MCR(Main Control Room), SPDS(Safety Parameter Display System), RSP(Remote Shutdown Panel), and the selected LCBs(Local Control Boards) importantly related to safety. As results of the assessments, any significant problem challenging the safety was not found on human factors in the MMI devices. However, several small items to be changed and improved in suitability of MMI devices were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on MMI area.

  10. Dam safety review using non-destructive methods for reinforced concrete structure

    Energy Technology Data Exchange (ETDEWEB)

    Philibert, Alain; Saint-Pierre, Francois; Turcotte, Bernard [Le Groupe S.M. International Inc., Sherbrooke, (Canada)

    2010-07-01

    Dams built at the beginning of the twentieth century include concrete structures that were put in under rehabilitation works. In some cases, the details of the structures are not well documented. In other cases, concrete damage can be hidden under new layers of undamaged material. This requires that the dam safety review in a real investigation gather the information necessary for carrying out the hydraulic and stability studies required by the Dam Safety Act. This paper presented the process of dam safety review using non-destructive methods for reinforced concrete structures. Two reinforced concrete dams built in the 1900's, the Eustic dam on the Coaticook River and the Frontenac dam on the Magog River near Sherbrooke, were evaluated by S.M. International using non-destructive methods such as sonic and ground penetrating radar methods. The studies allowed mapping of concrete damage and provided geometric information on some non visible structure elements that were part of previous reinforcement operations.

  11. Determinants of safety outcomes and performance: A systematic literature review of research in four high-risk industries.

    Science.gov (United States)

    Cornelissen, Pieter A; Van Hoof, Joris J; De Jong, Menno D T

    2017-09-01

    In spite of increasing governmental and organizational efforts, organizations still struggle to improve the safety of their employees as evidenced by the yearly 2.3 million work-related deaths worldwide. Occupational safety research is scattered and inaccessible, especially for practitioners. Through systematically reviewing the safety literature, this study aims to provide a comprehensive overview of behavioral and circumstantial factors that endanger or support employee safety. A broad search on occupational safety literature using four online bibliographical databases yielded 27.527 articles. Through a systematic reviewing process 176 online articles were identified that met the inclusion criteria (e.g., original peer-reviewed research; conducted in selected high-risk industries; published between 1980-2016). Variables and the nature of their interrelationships (i.e., positive, negative, or nonsignificant) were extracted, and then grouped and classified through a process of bottom-up coding. The results indicate that safety outcomes and performance prevail as dependent research areas, dependent on variables related to management & colleagues, work(place) characteristics & circumstances, employee demographics, climate & culture, and external factors. Consensus was found for five variables related to safety outcomes and seven variables related to performance, while there is debate about 31 other relationships. Last, 21 variables related to safety outcomes and performance appear understudied. The majority of safety research has focused on addressing negative safety outcomes and performance through variables related to others within the organization, the work(place) itself, employee demographics, and-to a lesser extent-climate & culture and external factors. This systematic literature review provides both scientists and safety practitioners an overview of the (under)studied behavioral and circumstantial factors related to occupational safety behavior. Scientists

  12. Review of current status of LWR safety research in Japan

    International Nuclear Information System (INIS)

    Yamada, Tasaburo; Mishima, Yoshitsugu; Ando, Yoshio; Miyazono, Shohachiro; Takashima, Yoichi.

    1977-01-01

    The Japan Atomic Energy Commission has exerted efforts on the research of the safety of nuclear plants in Japan, and ''Nuclear plant safety research committees'' was established in August 1974, which is composed of the government and the people. The philosophy of safety research, research and development plan, the forwarding procedure of the plan, international cooperation, for example LOFT program, and the effective feed back of the experimental results concerning nuclear safety are reviewed in this paper at first. As for the safety of nuclear reactors the basic philosophy that radio active fission products are contained in fuel or reactors with multiple barriers, (defence in depth) and almost no fission product is released outside reactor plants even at the time of hypothetical accident, is kept, and the research and development history and the future plan are described in this paper with the related technical problems. The structural safety is also explained, for example, on the philosophy ''leak before break'', pipe rupture, pipe restraint and stress analysis. The release of radioactive gas and liquid is decreased as the philosophy ''ALAP''. And probability safety evaluation method, LOCA, reactivity, accident and aseismatic design in nuclear plants in Japan are described. (Nakai, Y.)

  13. Safety analysis and review system: a Department of Energy safety assurance tool

    International Nuclear Information System (INIS)

    Rosenthal, H.B.

    1981-01-01

    The concept of the Safety Analysis and Review System is not new. It has been used within the Department and its predecessor agencies, Atomic Energy Commission (AEC) and Energy Research and Development Administration (ERDA), for over 20 years. To minimize the risks from nuclear reactor and power plants, the AEC developed a process to support management authorization of each operation through identification and analysis of potential hazards and the measures taken to control them. As the agency evolved from AEC through ERDA to the Department of Energy, its responsibilities were broadened to cover a diversity of technologies, including those associated with the development of fossil, solar, and geothermal energy. Because the safety analysis process had proved effective in a technology of high potential hazard, the Department investigated the applicability of the process to the other technologies. This paper describes the system and discusses how it is implemented within the Department

  14. An integrative review of patient safety in studies on the care and safety of patients with communication disabilities in hospital.

    Science.gov (United States)

    Hemsley, Bronwyn; Georgiou, Andrew; Hill, Sophie; Rollo, Megan; Steel, Joanne; Balandin, Susan

    2016-04-01

    To review the research literature on the experiences of patients with communication disabilities in hospital according to the Generic Model of patient safety. In 2014 and 2015, we searched four scientific databases for studies with an aim or result relevant to safety of hospital patients with communication disabilities. The review included 27 studies. A range of adverse event types were outlined in qualitative research. Little detail was provided about contributing or protective factors for safety incidents in hospital for these patients or the impact of the incidents on the patient or organisations involved. Further research addressing the safety of patients with communication disabilities is needed. Sufficient detail is required to identify the nature, timing, and detection of incidents; factors that contribute to or prevent adverse events; and detail the impact of the adverse events. In order to provide safe and effective care to people with communication disabilities in hospital, a priority for health and disability services must be the design and evaluation of ecologically appropriate and evidence-based interventions to improve patient care, communication, and reduce the risk of costly and harmful patient safety incidents. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  15. Regulatory review and confidence building in post-closure safety assessments and safety cases for near surface disposal facilities-IAEA ASAM coordinated research programme

    International Nuclear Information System (INIS)

    Gonzales, A.; Simeonov, G.; Bennett, D.G.; Nys, V.; Ben Belfadhel, M.

    2005-01-01

    Some years ago, the IAEA successfully concluded a Coordinated Research Program (CRP) called Islam, which focussed on the development of an Improved Safety Assessment Methodology for near-surface radioactive waste disposal facilities. In November 2002, and as an extension of ISAM, the IAEA launched a new CRP called ASAM, designed to test the Application of the Safety Assessment Methodology by considering a range of near-surface disposal facilities. The ASAM work programme is being implemented by three application working groups and two cross-cutting working groups. The application working groups are testing the applicability of the ISAM methodology by assessing an existing disposal facility in Hungary, a copper mine in South Africa, and a hypothetical facility containing heterogenous wastes, such as disused sealed sources. The first cross-cutting working group is addressing a number of technical issues that are common to all near-surface disposal facilities, while the second group, the Regulatory Review Working Group (RRWG) is developing guidance on how to gain confidence in safety assessments and safety cases, and on how to conduct regulatory reviews of safety assessments. This paper provides a brief overview of the work being conducted by the Regulatory Review Working Group. (author)

  16. Safety report content and development for test loop facility on MARIA reactor

    International Nuclear Information System (INIS)

    Konechko, A.; Shumskij, A.M.; Mikul'ahin, V.E.

    1982-01-01

    A 600 kW test loop facility for investigatin.o safety problems is realized on MARIA reactor in Poland together with USSR organizations. Safety reports have been developed in two steps at the designstage. The 1st report being essentially a preliminary safety analysis was developed within the scope of the feasibility study. At the engineering design stage the preliminary test loop facility safety report had been prepared considering measures excluding the possibility of the MARIA reactor damage. The test loop facility safety report is fulfilled for normal, transient and emergency operation regimes. Separate safety basing for each group of experiments will be prepared. The report presents the test loop facility safety criteria coordinated by the nuclear safety comission. They contains the preliminary reports on the test loop facility safety. At the final stage of construction and at thecommitioning stage the start-up safety report will be developed which after required correction and adding up the putting into operation data will turn into operation safety report [ru

  17. Review of probabilistic safety assessments: insights and recommendations regarding further developments

    International Nuclear Information System (INIS)

    Spitzer, C.

    1996-01-01

    Probabilistic Safety Assessments (PSAs) performed by utilities in the framework of Periodic Safety Reviews for German nuclear power plants are reviewed by TUeV Suedwest. Insights gained and recommendations concerning the necessity and focus of further developments and applications according to practical requests for the performance and assessment of PSAs within regulatory procedures are presented in this paper. Further on, recommendations are made in order to ensure the validity of the results of PSAs necessary in order to achieve the goals thereof. Beside some general points of view the emphasis of the paper is on methodological aspects with respect to evaluation methods and assessment of common cause failures as well as human reliability assessment

  18. Panel Resource Management (PRM) Implementation and Effects within Safety Review Panel Settings and Dynamics

    Science.gov (United States)

    Taylor, Robert W.; Nash, Sally K.

    2007-01-01

    While technical training and advanced degree's assure proficiency at specific tasks within engineering disciplines, they fail to address the potential for communication breakdown and decision making errors familiar to multicultural environments where language barriers, intimidating personalities and interdisciplinary misconceptions exist. In an effort to minimize these pitfalls to effective panel review, NASA's lead safety engineers to the ISS Safety Review Panel (SRP), and Payload Safety Review Panel (PSRP) initiated training with their engineers, in conjunction with the panel chairs, and began a Panel Resource Management (PRM) program. The intent of this program focuses on the ability to reduce the barriers inhibiting effective participation from all panel attendees by bolstering participants confidence levels through increased communication skills, situational awareness, debriefing, and a better technical understanding of requirements and systems.

  19. Immunization Safety Review: Thimerosal - Containing Vaccines and Neurodevelopmental Disorders

    National Research Council Canada - National Science Library

    Stratton, Kathleen; Gable, Alicia; McCormick, Marie C

    2001-01-01

    ..., and Marie C.McCormick, Editors Immunization Safety Review Committee Board on Health Promotion and Disease Prevention INSTITUTE OF MEDICINE NATIONAL ACADEMY PRESS Washington, D.C. Copyrightoriginal retained, the be not from cannot book, paper original however, for version formatting, authoritative the typesetting-specific created from the as publ...

  20. Air Travel Safety in Postoperative Breast Cancer Patients: A Systematic Review.

    Science.gov (United States)

    Co, Michael; Ng, Judy; Kwong, Ava

    2018-05-17

    Air travel has long been a dilemma in post-breast cancer surgery patients. Anecdotal reports have described adverse outcomes on surgical wound, implants, and lymphedema during air travel. This review aims to evaluate the best evidence from the literature concerning the air travel safety in breast cancer patients. A comprehensive review was performed of the Medline, Embase, CINAHL, and Cochrane databases using a predefined strategy. Retrieved studies were independently screened and rated for relevance. Data were extracted by 2 researchers. We reviewed the best evidence on air travel safety in postoperative breast cancer patients. Evidence was limited in the current literature to suggest adverse effects on postoperative mastectomy wounds and drains by high-altitude travel. Similarly, adverse effects on breast implants were limited to case reports and ex vivo experiments. A systematic review of 12 studies concluded that air travel is not associated with upper limb lymphedema after breast cancer surgery. Deep-vein thrombosis (DVT) is a known complication after air travel; in addition, malignancy itself is a known risk factor for DVT. Evidence of safety to continue tamoxifen during the period of air travel is lacking in the literature. Evidence to support the use of systemic DVT prophylaxis in general postoperative breast cancer patients is also limited. Best evidence from a large retrospective study suggested that mechanical antiembolism devices and early mobilization are the only measures required. Air travel is generally safe in patients after breast cancer surgery. Copyright © 2018. Published by Elsevier Inc.

  1. Pharmacist medication reviews to improve safety monitoring in primary care patients.

    Science.gov (United States)

    Gallimore, Casey E; Sokhal, Dimmy; Zeidler Schreiter, Elizabeth; Margolis, Amanda R

    2016-06-01

    Patients prescribed psychotropic medications within primary care are at risk of suboptimal monitoring. It is unknown whether pharmacists can improve medication safety through targeted monitoring of at risk populations. Access Community Health Centers implemented a quality improvement pilot project that included pharmacists on an integrated care team to provide medication reviews for patients. Aims were to determine whether inclusion of a pharmacist performing medication reviews within a primary care behavioral health (PCBH) practice is feasible and facilitates safe medication use. Pharmacists performed medication reviews of the electronic health record for patients referred for psychiatry consultation. Reviews were performed 1-3 months following consultation and focused on medications with known suboptimal monitoring rates. Reviews were documented within the EHR and routed to the primary care provider. Primary outcome measures were change in percentage up-to-date on monitoring and AIMS assessment, and at risk of experiencing drug interaction(s) between baseline and 3 months postreview. Secondary outcome was provider opinion of medication reviews collected via electronic survey. Reviews were performed for 144 patients. Three months postreview, percentage up-to-date on recommended monitoring increased 18% (p = .0001), at risk for drug interaction decreased 20% (p improved safety monitoring of psychotropic medications. Results identify key areas for improvement that other clinics considering integration of similar pharmacy services should consider. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  2. SKI - ASAR - O3. As operated Safety Analysis Report. Recurring safety review 1996 Oskarshamn 3

    International Nuclear Information System (INIS)

    1997-12-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a ''ASAR''-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the ''SKI-ASAR'' report). Each Swedish reactor should pass through three full ASAR reviews during its life-time, similar to the licensing inspection before start-up of the reactor. The first series ASAR was delivered by OKG to SKI in December 1996, and forms the basis for the SKI analysis in the present report

  3. SKI - ASAR - F3. As operated Safety Analysis Report. Recurring safety review 1996 Forsmark 3

    International Nuclear Information System (INIS)

    1997-12-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a ''ASAR''-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the ''SKI-ASAR'' report). Each Swedish reactor should pass through three full ASAR reviews during its life-time, similar to the licensing inspection before start-up of the reactor. The first series ASAR was delivered by FKA to SKI in December 1996, and forms the basis for the SKI analysis in the present report

  4. SKI - ASAR - R1. As operated Safety Analysis Report. Recurring safety review 1995 Ringhals 1

    International Nuclear Information System (INIS)

    2000-01-01

    According to Swedish law, the reactor owner is responsible for performing a safety review and writing a so called ASAR-report. The Nuclear Power Inspectorate (SKI) examines this report, and reports the findings to the government (the so called SKI-ASAR-report). Each Swedish reactor should pass through three full ASAR reviews during its lifetime, similar to the licensing inspection before start-up of the reactor. The second series ASAR was delivered by the Ringhals utility to SKI in September 1995, and forms the basis for the SKI analysis in the present report

  5. Development of vendor independent safety analysis capability for nuclear power plants in Taiwan

    International Nuclear Information System (INIS)

    Tang, J.-R.

    2001-01-01

    The Institute of Nuclear Energy Research (INER) and the Taiwan Power Company (TPC) have long-term cooperation to develop vendor independent safety analysis capability to provide support to nuclear power plants in Taiwan in many aspects. This paper presents some applications of this analysis capability, introduces the analysis methodology, and discusses the significance of vendor independent analysis capability now and future. The applications include a safety analysis of core shroud crack for Chinshan BWR/4 Unit 2, a parallel reload safety analysis of the first 18-month extended fuel cycle for Kuosheng BWR/6 Unit 2 Cycle 13, an analysis to support Technical Specification change for Maanshan three-loop PWR, and a design analysis to support the review of Preliminary Safety Analysis Report of Lungmen ABWR. In addition, some recent applications such as an analysis to support the review of BWR fuel bid for Chinshan and Kuosheng demonstrates the needs of further development of the analysis capability to support nuclear power plants in the 21 st century. (authors)

  6. Human Factors Evaluation of Procedures for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the results of human factors assessment on the plant operating procedures as part of Periodic Safety Review(PSR) of Yonggwang Nuclear Power Plant Unit no. 1, 2. The suitability of item and appropriateness of format and structure in the key operating procedures of nuclear power plants were investigated by the review of plant operating experiences and procedure documents, field survey, and experimental assessment on some part of procedures. A checklist was used to perform this assessment and record the review results. The reviewed procedures include EOP(Emergency Operating Procedures), GOP(General Operating Procedures), AOP(Abnormal Operating Procedures), and management procedures of some technical departments. As results of the assessments, any significant problem challenging the safety was not found on the human factors in the operating procedures. However, several small items to be changed and improved were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on the operating procedure.

  7. IRIS guidelines. 2014 ed. Integrated Review of Infrastructure for Safety (IRIS) for self-assessment when establishing the safety infrastructure for a nuclear power programme

    International Nuclear Information System (INIS)

    2014-01-01

    The IAEA safety standards reflect an international consensus on what constitutes a high level of safety for protecting people and the environment, and therefore represent what all Member States should achieve, whilst recognizing the ultimate responsibility of each State to ensure safety when implementing a nuclear power programme. IAEA Safety Standards Series No. SSG-16, entitled Establishing the Safety Infrastructure for a Nuclear Power Programme was published in order to provide recommendations, presented in the form of sequential actions, on meeting safety requirements progressively during the initial three phases of the development of safety, as described in INSAG-22, Nuclear Safety Infrastructure for a National Nuclear Power Programme Supported by the IAEA Fundamental Safety Principles. To that end, the 200 safety related actions, which are proposed by SSG-16, constitute a roadmap to establish a foundation for promoting a high level of safety over the entire lifetime of the nuclear power plant. These actions reflect international consensus on good practice in order to achieve full implementation of IAEA safety standards. The IAEA has developed a methodology and tool, the Integrated Review of Infrastructure for Safety (IRIS), to assist States in undertaking self-assessment with respect to SSG-16 recommendations when establishing the safety infrastructure for a nuclear power programme, and to develop an action plan for improvement. The IRIS methodology and the associated tool are fully compatible with the IAEA safety standards and are also used, when appropriate, in the preparation of review missions, such as the Integrated Regulatory Review Service and advisory missions. The present guidelines describe the IRIS methodology for self-assessment against SSG-16 recommendations. Through IRIS implementation, every organization concerned with nuclear safety may gain proper awareness and engage in a continuous progressive process to develop the effective national

  8. Current Status of Periodic Safety Review of HANARO Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Minjin; Ahn, Guk-Hoon; Lee, Choong Sung [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    A PSR for a research reactor became a legal requirement as the Nuclear Safety Act was amended and came into effect in 2014. This paper describes the current status and methodology of the first Periodic Safety Review (PSR) of HANARO that is being performed. The legal requirements, work plan, and process of implementing a PSR are described. Because this is the first PSR for a research reactor, it is our understating that the operating organization and regulatory body should communicate well with each other to complete the PSR in a timely manner. The first PSR of HANARO is under way. In order to achieve a successful result, activities of the operation organization such as scheduling, maintaining consistency in input data for review, and reviewing the PSR reports that will require intensive resources should be well planned. This means the operating organization needs to incorporate appropriate measures to ensure the transfer of knowledge and expertise arising from the PSR via a contractor to the operation organization. It is desirable for the Regulatory Body to be involved in all stage of the PSR to prevent any waste of resources and minimize the potential for a reworking of the PSR and the need for an additional assessment and review as recommended by foreign experts.

  9. An international review of patient safety measures in radiotherapy practice

    International Nuclear Information System (INIS)

    Shafiq, Jesmin; Barton, Michael; Noble, Douglas; Lemer, Claire; Donaldson, Liam J.

    2009-01-01

    Errors from radiotherapy machine or software malfunction usually are well documented as they affect hundreds of patients, whereas random errors affecting individual patients are more difficult to be discovered and prevented. Although major clinical radiotherapy incidents have been reported, many more have remained unrecognised or have not been reported. The literature in this field is limited as it is mostly published as a result of investigation of major errors. We present a review of radiotherapy incidents internationally with the aim of identifying the domains where most errors occur through extensive review and synthesis of published reports, unpublished 'Grey literature' and departmental incident data. Our review of radiotherapy-related events in the last three decades (1976-2007) identified more than seven thousand (N = 7741) incidents and near misses. Three thousand one hundred and twenty-five incidents reported patient harm of variable intensity ranging from underdose increasing the risk of recurrence, to overdose causing toxicity, and even death for 1% (N = 38); 4616 events were near misses with no recognisable patient harm. Based on our review, a radiotherapy risk profile has been published by the WHO World Alliance for Patient Safety that highlights the role of communication, training and strict adherence to guidelines/protocols in improving the safety of radiotherapy process.

  10. International review on safety requirements for the prototype fast breeder reactor “Monju” (Translated document)

    International Nuclear Information System (INIS)

    2016-02-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  11. Human factors engineering design review acceptance criteria for the safety parameter display

    International Nuclear Information System (INIS)

    McGevna, V.; Peterson, L.R.

    1981-01-01

    This report contains human factors engineering design review acceptance criteria developed by the Human Factors Engineering Branch (HFEB) of the Nuclear Regulatory Commission (NRC) to use in evaluating designs of the Safety Parameter Display System (SPDS). These criteria were developed in response to the functional design criteria for the SPDS defined in NUREG-0696, Functional Criteria for Emergency Response Facilities. The purpose of this report is to identify design review acceptance criteria for the SPDS installed in the control room of a nuclear power plant. Use of computer driven cathode ray tube (CRT) displays is anticipated. General acceptance criteria for displays of plant safety status information by the SPDS are developed. In addition, specific SPDS review criteria corresponding to the SPDS functional criteria specified in NUREG-0696 are established

  12. International nuclear safety experts conclude IAEA peer review of China's regulatory system

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of senior experts on nuclear safety regulation today completed a two-week International Atomic Energy Agency (IAEA) review of the governmental and regulatory framework for nuclear safety in the People's Republic of China. The team identified good practices within the system and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of the People's Republic of China. The final report will be submitted to China by Autumn 2010. At the request of Chinese authorities, the IAEA assembled a team of 22 experts to conduct an Integrated Regulatory Review Service (IRRS) mission. This mission is a peer review based on the IAEA Safety Standards . It is not an inspection, nor an audit. The experts came from 15 different countries: Australia, Canada, the Czech Republic, Finland, France, Hungary, Japan, Pakistan, the Republic of Korea, Slovenia, South Africa, Sweden, the United Kingdom, Ukraine and the United States. Mike Weightman, the United Kingdom's Head of Nuclear Directorate, HSE and HM Chief Inspector of Nuclear Installations said: ''I was honoured and pleased to lead such a team of senior regulatory experts from around the world, and I was impressed by their commitment, experience and hard work to provide their best advice possible. We had very constructive interactions with the Chinese authority to maximize the beneficial impact of the mission.'' The scope of the mission included the regulation of nuclear and radiation safety of the facilities and activities regulated by the Ministry of Environmental Protection (MEP) National Nuclear Safety Administration (NNSA). The mission was conducted from 18 to 30 July, mainly in Beijing. To observe Chinese regulatory activities, the IRRS team visited several nuclear facilities, including a nuclear power plant, a manufacturer of safety components for nuclear power plants, a research reactor, a fuel cycle facility, a waste management facility

  13. Preliminary report of radiological safety to hydrology 1993 campaign

    International Nuclear Information System (INIS)

    Badano, A.; Suarez Antola, R.; Dellepere, A.; Barreiro, M.

    1993-01-01

    This report has been prepared based on the interaction between project managers and division radiological Protection and Nuclear Safety. In seeking to establish a basis for approval from the point of view of radiation safety practices . The idea for the audit has been provided at all times because the interest was the exchange of ideas and the use of common sense to improve the safety of radioactive substances, security of operators and public safety and environment.The above shows that in the planned radiation safety condition described in this report,the practice can be carried out according to the criteria of safety accepted .

  14. Safety cases for radioactive waste disposal facilities: guidance on confidence building and regulatory review IAEA-ASAM co-ordinated research project

    International Nuclear Information System (INIS)

    Ben Belfadhel, M.; Bennett, D.G.; Metcalf, P.; Nys, V.; Goldammer, W.

    2008-01-01

    The IAEA has been conducting two co-ordinated research programmes (CRPs) projects to develop and apply improved safety assessment methodologies for near-surface radioactive waste disposal facilities. The more recent of these projects, ASAM (application of safety assessment methodologies), included a Regulatory Review Working Group (RRWG) which has been working to develop guidance on how to gain confidence in safety assessments and safety cases, and on how to conduct regulatory reviews of safety assessments. This paper provides an overview of the ASAM project, focusing on the safety case and regulatory review. (authors)

  15. Situational analysis: preliminary regional review of the Mental Health Atlas 2014.

    Science.gov (United States)

    Gater, R; Chew, Z; Saeed, K

    2015-09-28

    The WHO comprehensive Mental Health Action Plan 2013-2020 established goals and objectives that Member States have agreed to meet by 2020. To update the Atlas of Mental Health 2011, specific indicators from the Mental Health Action Plan and additional indicators on service coverage were incorporated into the questionnaire for the Atlas 2014. The data will help facilitate improvement in information gathering and focus efforts towards implementation of the Mental Health Action Plan. The questionnaire was completed by the national mental health focal point of each country. This preliminary review seeks to consolidate data from the initial response to the Atlas 2014 questionnaire by Member States in the Eastern Mediterranean Region. Data for this review were analysed for the whole Region, by health systems groupings and by individual countries. Where possible, data are compared with the Mental Health Atlas 2011 to give a longitudinal perspective.

  16. Preliminary design for hot dirty-gas control-valve test facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    This report presents the results of a preliminary design and cost estimating effort for a facility for the testing of control valves in Hot Dirty Gas (HDGCV) service. This design was performed by Mittelhauser Corporation for the United States Department of Energy's Morgantown Energy Technology Center (METC). The objective of this effort was to provide METC with a feasible preliminary design for a test facility which could be used to evaluate valve designs under simulated service conditions and provide a technology data base for DOE and industry. In addition to the actual preliminary design of the test facility, final design/construction/operating schedules and a facility cost estimate were prepared to provide METC sufficient information with which to evaluate this design. The bases, assumptions, and limitations of this study effort are given. The tasks carried out were as follows: METC Facility Review, Environmental Control Study, Gas Generation Study, Metallurgy Review, Safety Review, Facility Process Design, Facility Conceptual Layout, Instrumentation Design, Cost Estimates, and Schedules. The report provides information regarding the methods of approach used in the various tasks involved in the completion of this study. Section 5.0 of this report presents the results of the study effort. The results obtained from the above-defined tasks are described briefly. The turnkey cost of the test facility is estimated to be $9,774,700 in fourth quarter 1979 dollars, and the annual operating cost is estimated to be $960,000 plus utilities costs which are not included because unit costs per utility were not available from METC.

  17. International nuclear safety experts complete IAEA peer review of German regulatory system

    International Nuclear Information System (INIS)

    2008-01-01

    Full text: An international expert team has today completed a two-week IAEA review of Germany's nuclear regulatory system. The team identified good practices within the system and gave advice on some areas for further improvement. The IAEA has conveyed the initial findings to German authorities but the final report will be submitted within two months. At the request of the Government of the Federal Republic of Germany, the International Atomic Energy Agency (IAEA) assembled a team of 14 experts to conduct an Integrated Regulatory Review Service (IRRS) mission. This is a peer review based on IAEA Standards. It is not an inspection, nor an audit. The scope of the mission was limited to the safety regulation of nuclear power plants. Experts from Canada, the Czech Republic, Finland, France, Japan, the Netherlands, Republic of Korea, Spain, Switzerland, the UK, the US and from the IAEA took part in the mission, which was conducted from 7 to 19 September in Bonn, Stuttgart and Berlin. The main basis for the review was a well-prepared self-assessment made by the Federal Ministry of Environment, Nature Conservation and Nuclear Safety (BMU) and the Ministry of Environment of the federal state of Baden-Wuerttemberg (UM BW). 'The team members were impressed by the extensive preparation and dedication of the staff both at BMU and UM BW to excellence in nuclear safety,' said Mike Weightman, IRRS Team Leader and Chief Inspector of the UK nuclear regulatory body, the Nuclear Directorate of the Health and Safety Executive. 'We hope the IRRS mission will facilitate further improvements in the safety regulation of nuclear power in Germany and throughout the world.' 'Germany's invitation to undergo such a detailed review is a clear demonstration of its openness and commitment to continuously improve nuclear safety regulation,' said Philippe Jamet, Director of the IAEA's Nuclear Installation Safety Division. Among the particular strengths of BMU and UM BW associated with their

  18. [Road safety measures and their effects on traffic injuries: a systematic review].

    Science.gov (United States)

    Aguilera, Sandra Lúcia Vieira Ulinski; Moysés, Simone Tetú; Moysés, Samuel Jorge

    2014-10-01

    To identify and summarize the findings of studies describing interventions aimed at reducing road traffic injuries. An integrative systematic review without meta-analysis was performed. The Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) were used to synthesize the findings of the articles reviewed. The keywords "traffic accidents", "review" and "public policy" were used in isolation or combined with boolean operator "And" to search PubMed, Web of Science, SciELO, and LILACS for the period between 2006 and 2011 RESULTS: Twenty-two studies were included in the systematic review. Of these, two described engineering strategies, two described other road safety policies, three described education strategies, and 15 described law enforcement policies. Law enforcement had the most effective immediate results. Engineering strategies proved important to promote a safe environment. Finally, education strategies had an informative role and served to support other strategies, but did not seem sufficient to promote cultural changes regarding road safety. Law enforcement seems to be the most effective strategy to change the behavior of drivers, especially regarding speed limits and drinking and driving.

  19. Involving patients in patient safety programmes: A scoping review and consensus procedure by the LINNEAUS collaboration on patient safety in primary care

    NARCIS (Netherlands)

    Trier, H.; Valderas, J.M.; Wensing, M.; Martin, H.M.; Egebart, J.

    2015-01-01

    BACKGROUND: Patient involvement has only recently received attention as a potentially useful approach to patient safety in primary care. OBJECTIVE: To summarize work conducted on a scoping review of interventions focussing on patient involvement for patient safety; to develop consensus-based

  20. Criteria for safety related nuclear plant operator actions: a preliminary assessment of available data

    International Nuclear Information System (INIS)

    Haas, P.M.; Bott, T.F.

    1982-01-01

    The need for a quantitative data base on the reliability of nuclear power plant operators has long been recognised by human factors and reliability analysts, and the great need for further assessment of operator performance under accident conditions has been dramatically emphasised by the incident at Three Mile Island-2. In the US, an effort has been under way for a number of years to develop a design standard to define when required manual operator action can be accepted as part of a nuclear plant design basis. To provide the necessary data base to support such standards and the necessary quantitative assessment of operator reliability, the US Nuclear Regulatory Commission is sponsoring a study at Oak Ridge National Laboratory to develop the data base. A preliminary assessment, completed in April 1979, concluded that sufficient data from US operating experience did not exist to provide an adequate data base. A programme of research using full-scope nuclear plant simulators and results that are correlated to field data was suggested. That programme was recently initiated. This paper reviews the approach, results and conclusions of the preliminary assessment and summarises the planned research programme of simulator studies. (author)

  1. Los Alamos National Laboratory corregated metal pipe saw facility preliminary safety analysis report. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-09-19

    This Preliminary Safety Analysis Report addresses site assessment, facility design and construction, and design operation of the processing systems in the Corrugated Metal Pipe Saw Facility with respect to normal and abnormal conditions. Potential hazards are identified, credible accidents relative to the operation of the facility and the process systems are analyzed, and the consequences of postulated accidents are presented. The risk associated with normal operations, abnormal operations, and natural phenomena are analyzed. The accident analysis presented shows that the impact of the facility will be acceptable for all foreseeable normal and abnormal conditions of operation. Specifically, under normal conditions the facility will have impacts within the limits posted by applicable DOE guidelines, and in accident conditions the facility will similarly meet or exceed the requirements of all applicable standards. 16 figs., 6 tabs.

  2. Report of the review committee on evaluation of the R and D subjects in the field of nuclear safety research

    International Nuclear Information System (INIS)

    2000-09-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee and Research Evaluation Committee, the Ad Hoc Review Committee on Nuclear Safety Research composed of twelve experts was set up under the Research Evaluation Committee of the JAERI in order to review the R and D subjects to be implemented for five years starting in FY2000 in the Nuclear Safety Research Center (Department of Reactor Safety Research, Department of Fuel Cycle Safety Research and Department of Safety Research Technical Support). The Ad Hoc Review Committee meeting was held on January 20, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  3. Timing of Formal Phase Safety Reviews for Large-Scale Integrated Hazard Analysis

    Science.gov (United States)

    Massie, Michael J.; Morris, A. Terry

    2010-01-01

    Integrated hazard analysis (IHA) is a process used to identify and control unacceptable risk. As such, it does not occur in a vacuum. IHA approaches must be tailored to fit the system being analyzed. Physical, resource, organizational and temporal constraints on large-scale integrated systems impose additional direct or derived requirements on the IHA. The timing and interaction between engineering and safety organizations can provide either benefits or hindrances to the overall end product. The traditional approach for formal phase safety review timing and content, which generally works well for small- to moderate-scale systems, does not work well for very large-scale integrated systems. This paper proposes a modified approach to timing and content of formal phase safety reviews for IHA. Details of the tailoring process for IHA will describe how to avoid temporary disconnects in major milestone reviews and how to maintain a cohesive end-to-end integration story particularly for systems where the integrator inherently has little to no insight into lower level systems. The proposal has the advantage of allowing the hazard analysis development process to occur as technical data normally matures.

  4. HERBE final safety report; HERBE Finalni sigurnosni izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The Final safety report of HERBE system constructed at the RB reactor consists of 13 chapters, as follows. Chapter 0 includes a summary and the contents of the Final safety report, fundamental characteristics of the system and conclusion remarks, with the license agreement of the Safety Committee of the Boris Kidric Institute. Chapter 1 describes and analyzes the site of the HERBE system, including demography, topography, meteorology, hydrology, geology, seismicity, ecology. Chapter 3 covers technical characteristics of the system, Chapter 4 deals with safety analysis, Chapter 5 describes organisation of construction and preliminary operational testing of the system. Chapter 6 deals with organisation and program of test and regular operation, relevant procedures. Chapter 7 defines operational conditions and constraints, Chapter 8 and describe methods and means of radiation protection and radioactive materials management respectively. Chapter 10 contains a review of emergency plans, measures and procedures for nuclear accident protection. Chapters 11 and 12 are concerned with quality assurance program and physical protection of the HERBE system and related nuclear material.

  5. Most significant preliminary results of the probabilistic safety analysis on the Juragua nuclear power plant; Resultados preliminares mas significativos del analysis probabilista de seguridad de la Central Nuclear de Juragua

    Energy Technology Data Exchange (ETDEWEB)

    Perdomo, Manuel [Instituto Superior de Ciencia y Tecnologia Nuclear (ISCTN), La Habana (Cuba)

    1995-12-31

    Since 1990 the Group for PSA Development and Applications (GDA/APS) is working on the Level-1 PSA for the Juragua-1 NPP, as a part of an IAEA Technical Assistance Project. The main objective of this study, which is still under way, is to assess, in a preliminary way, the Reactor design safety to find its potential `weak points` at the construction stage, using a eneric data base. At the same time, the study allows the PSA team to familiarize with the plant design and analysis techniques for the future operational PSA of the plant. This paper presents the most significant preliminary results of the study, which reveal some advantages of the safety characteristics of the plant design in comparison with the homologous VVER-440 reactors and some areas, where including slight modifications would improve the plant safety, considering the level of detail at which the study is carried out. (author). 13 refs, 1 fig, 2 tabs.

  6. Recommendations: Procedure to develop a preliminary safety report as part of the radioactive waste repository construction licensing process

    International Nuclear Information System (INIS)

    2003-01-01

    The structure of a preliminary safety report for the title purpose should be as follows: A. Textual part: 1. General (Introduction, Basic information about the construction, Timetable); 2. Site information (Siting, Geography and demography, Meteorology and climatic situation, Hydrology, Geology and hydrogeology); 3. Repository design description (Basic function and performance requirements, Design, Auxiliary systems, Fire prevention/protection, Emergency plans); 4. Operation of the repository (Waste acceptance and inspection, Waste handling and interim storage, Waste disposal, Operating monitoring), 5. Health and environmental impact assessment (Radionuclide inventory, Radionuclide transport paths and mechanisms of release into the environment, Radionuclide release in normal and emergency situations, Radiation protection - health impact assessment and regulatory compliance, Draft operating limits and conditions, Proposed ways of assuring physical protection, Uncertainty assessment), 6. Safe repository shutdown/decommissioning concept, 7 Quality assurance assessment, 8. List of selected equipment. B. Annexes: Maps, Drawings, Diagrams, Miscellaneous; C. Documentation: Previous safety report amendments, Protocols, Miscellaneous. (P.A.)

  7. A review on food safety and food hygiene studies in Ghana

    OpenAIRE

    Ababio, P. F.; Lovatt, P.

    2015-01-01

    Food safety and hygiene in Ghana was studied using desk top literature review. Food research was highly concentrated in the capital city of the country and most research focus were on commercial food operations specifically street foods and microbiological safety with limited information from institutional catering and other forms of food hazards. The media currently serves as the main source for reporting of food borne diseases. Food establishments and other sources contributing to food born...

  8. ITER final design report, cost review and safety analysis (FDR) and relevant documents

    International Nuclear Information System (INIS)

    1999-01-01

    This volume contains the fourth major milestone report and documents associated with its acceptance, review and approval. This ITER Final Design Report, Cost Review and Safety Analysis was presented to the ITER Council at its 13th meeting in February 1998 and was approved at its extraordinary meeting on 25 June 1998. The contents include an outline of the ITER objectives, the ITER parameters and design overview as well as operating scenarios and plasma performance. Furthermore, design features, safety and environmental characteristics and schedule and cost estimates are given

  9. Proceedings of the Second NASA Aviation Safety Program Weather Accident Prevention Review

    Science.gov (United States)

    Martzaklis, K. Gus (Compiler)

    2003-01-01

    The Second NASA Aviation Safety Program (AvSP) Weather Accident Prevention (WxAP) Annual Project Review held June 5-7, 2001, in Cleveland, Ohio, presented the NASA technical plans and accomplishments to the aviation community. NASA-developed technologies presented included an Aviation Weather Information System with associated digital communications links, electronic atmospheric reporting technologies, forward-looking turbulence warning systems, and turbulence mitigation procedures. The meeting provided feedback and insight from the aviation community of diverse backgrounds and assisted NASA in steering its plans in the direction needed to meet the national safety goal of 80-percent reduction of aircraft accidents by 2007. The proceedings of the review are enclosed.

  10. Critical Review of Commercial Secondary Lithium-Ion Battery Safety Standards

    Science.gov (United States)

    Jones, Harry P.; Chapin, Thomas, J.; Tabaddor, Mahmod

    2010-09-01

    The development of Li-ion cells with greater energy density has lead to safety concerns that must be carefully assessed as Li-ion cells power a wide range of products from consumer electronics to electric vehicles to space applications. Documented field failures and product recalls for Li-ion cells, mostly for consumer electronic products, highlight the risk of fire, smoke, and even explosion. These failures have been attributed to the occurrence of internal short circuits and the subsequent thermal runaway that can lead to fire and explosion. As packaging for some applications include a large number of cells, the risk of failure is likely to be magnified. To address concerns about the safety of battery powered products, safety standards have been developed. This paper provides a review of various international safety standards specific to lithium-ion cells. This paper shows that though the standards are harmonized on a host of abuse conditions, most lack a test simulating internal short circuits. This paper describes some efforts to introduce internal short circuit tests into safety standards.

  11. SRTC criticality safety technical review: Nuclear criticality safety evaluation 94-02, uranium solidification facility pencil tank module spacing

    International Nuclear Information System (INIS)

    Rathbun, R.

    1994-01-01

    Review of NMP-NCS-94-0087, ''Nuclear Criticality Safety Evaluation 94-02: Uranium Solidification Facility Pencil Tank Module Spacing (U), April 18, 1994,'' was requested of the SRTC Applied Physics Group. The NCSE is a criticality assessment to show that the USF process module spacing, as given in Non-Conformance Report SHM-0045, remains safe for operation. The NCSE under review concludes that the module spacing as given in Non-Conformance Report SHM-0045 remains in a critically safe configuration for all normal and single credible abnormal conditions. After a thorough review of the NCSE, this reviewer agrees with that conclusion

  12. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  13. Preliminary Study on the Revision of Nuclear Safety Policy Statement

    International Nuclear Information System (INIS)

    Lee, Y. E.; Lee, S. H.; Chang, H. S.; Choi, K. S.; Jung, S. J.

    2011-01-01

    Nuclear safety policy in Korea is currently declared in the Nuclear Safety Charter as the highest tier document and safety principles and directions are announced in the Nuclear Safety Policy Statement. As the circumstances affecting on the nuclear safety policy change, it needs to revise the Statement. This study aims to develop the revised Nuclear Safety Policy Statement to declare that securing safety is a prerequisite to the utilization of nuclear energy, and that all workers in nuclear industry and regulatory body must adhere to the principle of priority to safety. As a result, two different types of revision are being prepared as of August. One is based on the spirit of Nuclear Safety Charter as well as the direction of future-oriented safety policies including the changes in the environment after declaration of the Statement. The other is to declare the fundamental safety objective and safety principles as the top philosophy of national nuclear safety policy by adopting the '10 Safety Principles in IAEA Safety Fundamental' instead of the current Charter. Both versions of revision are subject to further in-depth discussion. However once the revision is finalized and declared, it would be useful to accomplish effectively the organizational responsibilities and to enhance the public confidence in nuclear safety by performing the regulatory activities in a planned and systematic manner and promulgating the government's dedication to priority to safety

  14. ENHANCING FOOD SAFETY AND STABILITY THROUGH IRRADIATION: A REVIEW

    Directory of Open Access Journals (Sweden)

    Manzoor Ahmad Shah

    2014-04-01

    Full Text Available Food irradiation is one of the non thermal food processing methods. It is the process of exposing food materials to the controlled amounts of ionizing radiations such as gamma rays, X-rays and accelerated electrons, to improve microbiological safety and stability. Irradiation disrupts the biological processes that lead to decay of food quality. It is an effective tool to reduce food-borne pathogens, spoilage microorganisms and parasites; to extend shelf-life and for insect disinfection. The safety and consumption of irradiated foods have been extensively studied at national levels and in international cooperations and have concluded that foods irradiated under appropriate technologies are both safe and nutritionally adequate. Specific applications of food irradiation have been approved by national legislations of more than 55 countries worldwide. This review aims to discuss the applications of irradiation in food processing with the emphasis on food safety and stability.

  15. Automating the Generation of Heterogeneous Aviation Safety Cases

    Science.gov (United States)

    Denney, Ewen W.; Pai, Ganesh J.; Pohl, Josef M.

    2012-01-01

    A safety case is a structured argument, supported by a body of evidence, which provides a convincing and valid justification that a system is acceptably safe for a given application in a given operating environment. This report describes the development of a fragment of a preliminary safety case for the Swift Unmanned Aircraft System. The construction of the safety case fragment consists of two parts: a manually constructed system-level case, and an automatically constructed lower-level case, generated from formal proof of safety-relevant correctness properties. We provide a detailed discussion of the safety considerations for the target system, emphasizing the heterogeneity of sources of safety-relevant information, and use a hazard analysis to derive safety requirements, including formal requirements. We evaluate the safety case using three classes of metrics for measuring degrees of coverage, automation, and understandability. We then present our preliminary conclusions and make suggestions for future work.

  16. 76 FR 17472 - Public Meeting/Notice of Availability, Review, and Comment on Preliminary Alternatives for the...

    Science.gov (United States)

    2011-03-29

    ..., Review, and Comment on Preliminary Alternatives for the Development of an Air Tour Management Plan for... National Park Service, Hawaii Volcanoes National Park and the FAA's Air Tour Management Program. The... National Park, Klauea Visitor Center, 1 Crater Rim Drive, Phoa, Hawaii. Tuesday, April 19, 2011, 5-7 p.m...

  17. Comparison of Domestic Safety Review and European Union(EU) Stress Test After Nuclear Accident in Fukushima Daiichi NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Hwa Sung; Kim, Jin Weon [Chosun University, Gwangju (Korea, Republic of)

    2016-05-15

    The European Union(EU) nuclear regulators group established stress test criteria and procedures, and utilities performed a self-review in accordance with those criteria and procedures. For Wolsung nuclear unit-1,the stress test was additionally conducted for deciding the continued operation of NPP, even though the safety review had been conducted after Fukushima NPP accident. Thus, this study is to compares the process, criteria, and results of the safety review performed in domestic NPPs and EU stress test performed in Cernavoda NPP. From the comparisons, the effectiveness and necessity of the stress test to decide the continued operation of NPPs is discussed. and the improvement items for safety enhancement are derived. The comparison showed that the process and review criteria of EU stress test was more systematic and specific than those used in domestic NPPs. But it was indicated that the improvement items resulted from the safety review performed in domestic NPPs are more comprehensive and powerful than EU stress tests (Cernavoda NPP) results. EU stress test for Cernavoda NPP evaluated in 3 fieldsand derived 13 design change items. The 50 improvement items derived from domestic safety review were including the contents of these 13 items.

  18. Safety analysis and risk assessment of the National Ignition Facility

    International Nuclear Information System (INIS)

    Brereton, S.; McLouth, L.; Odell, B.

    1996-01-01

    The National Ignition Facility (NIF) is a proposed U.S. Department of Energy inertial confinement laser fusion facility. The candidate sites for locating the NIF are: Los Alamos National Laboratory, Sandia National Laboratory, the Nevada Test Site, and Lawrence Livermore National Laboratory (LLNL), the preferred site. The NIF will operate by focusing 192 laser beams onto a tiny deuterium-tritium target located at the center of a spherical target chamber. The NIF mission is to achieve inertial confinement fusion (ICF) ignition, access physical conditions in matter of interest to nuclear weapons physics, provide an above ground simulation capability for nuclear weapons effects testing, and contribute to the development of inertial fusion for electrical power production. The NIF has been classified as a radiological, low hazard facility on the basis of a preliminary hazards analysis and according to the DOE methodology for facility classification. This requires that a safety analysis be prepared under DOE Order 5481.1B, Safety Analysis and Review System. A draft Preliminary Safety Analysis Report (PSAR) has been written, and this will be finalized later in 1996. This paper summarizes the safety issues associated with the operation of the NIF and the methodology used to study them. It provides a summary of the methodology, an overview of the hazards, estimates maximum routine and accidental exposures for the preferred site of LLNL, and concludes that the risks from NIF operations are low

  19. Shielding modification and safety review on the nuclear ship 'Mutsu'

    International Nuclear Information System (INIS)

    Osanai, Masao

    1978-01-01

    The Japan Atomic Energy Commission (JAEC) called on the Japan Nuclear Ship Development Agency (JNSDA) for shielding modification and safety review on the nuclear ship ''Mutsu'', and JNSDA has conducted the research and development (R and D) to meet the request of JAEC for the above two items. Concerning the shield modification, the following matters are described: the study on the cause of radiation leakage which was concluded to the fast neutron streaming, the conceptual design for this modification, the mock up experiment for shielding utilizing JRR-4, the basic design following on the conceptual design, including the detailed drawings of the modified construction and the shielding analysis using RADHEAT-V3 code, and the relating experiments such as the heat transfer test of the primary shielding structure and the test of strength in stranding. As for the safety review, the survey of the troubles and the technical problems having been experienced in the light water reactor plants of land use, for example, fuel integrity, stress corrosion cracking and the leakage of steam generator tubes, the revision of the design so as to adapt to current safety standards and regulations, for example, in-service inspection, the setting of additional leak detectors in the primary cooling system, the modification of emergeney filters, etc., and the review of the design and construction corresponding to recent R and D works, such as re-evaluation of the core design, cooling capability of natural circulation, thermal stress analysis of main pipings, and the evaluation of ECCS performance are presented . (Nakai, Y.)

  20. Safe disposal of radioactive waste. Post-closure safety assessment of permanent repository in Novi han

    International Nuclear Information System (INIS)

    Mateeva, M.

    2007-01-01

    A presented material is the third part of the monograph with title 'Safe disposal of radioactive waste. Post-closure safety assessment of the permanent repository in Novi Han'. This part deals with review of the scenario selection procedure. The process system of permanent repository for radioactive waste is describing in details for different levels. Preliminary screening process of features, events and processes is presented here. Interaction matrixes for basic disposal system components are constructed. Final selection and grouping between the included features, events and processes is done. Selected and defined scenarios for post-closure safety assessment are presented too. Key words: post-closure safety assessment, scenario generation procedure, process system, process influence diagram, and interaction matrix

  1. Review of Preliminary Analysis Techniques for Tension Structures.

    Science.gov (United States)

    1984-02-01

    however,a linear dinamic analysis can be conducted for purposes of preliminary design, relative to the static configuration. It is noted that the amount of...16 Chapter 3. PRELIMINARY DESIGN OF TENSION STRUCTURES . . .. .. .. .... 22 S.3.1 Cable Systems . . . . . . . . . . . . .. .. .. .... 23...3.1.1 Singly-Connected Segments. .. .... ... 24 3.1.2 Multiply-Connected Segments . . .. .. .. .. 27 3.1.3 Linearized Dynamics of Cable Systems . . . . 29

  2. 76 FR 19516 - Public Meeting/Notice of Availability, Review, and Comment on Preliminary Alternatives for the...

    Science.gov (United States)

    2011-04-07

    ..., Review, and Comment on Preliminary Alternatives for the Development of an Air Tour Management Plan for... Park Service, Hawaii Volcanoes National Park and the FAA's Air Tour Management Program. This document... Center, 1 Crater Rim Drive. P[amacr]hoa, Hawaii, Tuesday, April 19, 2011, 5-7 p.m., P[amacr]hoa Community...

  3. Initial development of a practical safety audit tool to assess fleet safety management practices.

    Science.gov (United States)

    Mitchell, Rebecca; Friswell, Rena; Mooren, Lori

    2012-07-01

    Work-related vehicle crashes are a common cause of occupational injury. Yet, there are few studies that investigate management practices used for light vehicle fleets (i.e. vehicles less than 4.5 tonnes). One of the impediments to obtaining and sharing information on effective fleet safety management is the lack of an evidence-based, standardised measurement tool. This article describes the initial development of an audit tool to assess fleet safety management practices in light vehicle fleets. The audit tool was developed by triangulating information from a review of the literature on fleet safety management practices and from semi-structured interviews with 15 fleet managers and 21 fleet drivers. A preliminary useability assessment was conducted with 5 organisations. The audit tool assesses the management of fleet safety against five core categories: (1) management, systems and processes; (2) monitoring and assessment; (3) employee recruitment, training and education; (4) vehicle technology, selection and maintenance; and (5) vehicle journeys. Each of these core categories has between 1 and 3 sub-categories. Organisations are rated at one of 4 levels on each sub-category. The fleet safety management audit tool is designed to identify the extent to which fleet safety is managed in an organisation against best practice. It is intended that the audit tool be used to conduct audits within an organisation to provide an indicator of progress in managing fleet safety and to consistently benchmark performance against other organisations. Application of the tool by fleet safety researchers is now needed to inform its further development and refinement and to permit psychometric evaluation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Fuel safety criteria technical review - Results of OECD/CSNI/PWG2 Task Force on Fuel Safety Criteria

    International Nuclear Information System (INIS)

    Hollasky, N.; Valtonen, K.; Hache, G.; Gross, H.; Bakker, K.; Recio, M.; Bart, G.; Zimmermann, M.; Van Doesburg, W.; Killeen, J.; Meyer, R.O.; Speis, T.

    2000-01-01

    With the advent of advanced fuel and core designs, the adoption of more aggressive operational modes and the implementation of more accurate (best estimate or statistical) design and analysis methods, there is a concern if safety margins have remained adequate. Most - if not all - of the currently existing safety criteria were established during the 60's and early 70's, and verified against experiments with fuel that was available at that time, mostly with unirradiated specimens. Verification was of course performed as designs progressed in later years, however mostly with the aim to be able to prove that these designs adequately complied with existing criteria, and not to establish new limits. The OECD/CSNI/PWG2 Task Force on Fuel Safety Criteria (TFFSC) was therefore given the mandate to technically review the existing fuel safety criteria, focusing on the 'new design' elements (new fuel and core design, cladding materials, manufacturing processes, high burnup, MOX, etc.) introduced by the industry. It should also identify if additional efforts may be required (experimental, analytical) to ensure that the basis for fuel safety criteria is adequate to address the relevant safety issues. In this report, fuel-related criteria are discussed without attempting to categorize them according to event type or risk significance. For each of these 20 criteria, we present a brief description of the criterion as it is used in several applications along with the rationale for having such a criterion. New design elements, such as different cladding materials, higher burnup, and the use of MOX fuels, can affect fuel-related margins and, in some cases, the criteria themselves. Some of the more important effects are mentioned in order to indicate whether the criteria need to be re-evaluated. The discussion may not cover all possible effects, but should be sufficient to identify those criteria that need to be addressed. A summary of these discussions is given in Section 7. As part

  5. Perceived personal safety in relation to urban woodland vegetation – A review

    OpenAIRE

    Jansson, Märit; Fors, Hanna; Lindgren, Therese; Wiström, Björn

    2013-01-01

    Urban woodland vegetation provides people with many aesthetic, ecological and psychological benefits, but can also generate problems concerning people’s perception of safety. This paper reviews existing knowledge about perceived personal safety in relation to vegetation, particularly woodland vegetation, in urban green spaces such as parks and residential areas. Individual and social factors, but also vegetation character, maintenance and design, proved to be important for perceived personal ...

  6. Safety of licensed vaccines in HIV-infected persons: a systematic review protocol

    Science.gov (United States)

    2014-01-01

    Background Safety of vaccines remains a cornerstone of building public trust on the use of these cost-effective and life-saving public health interventions. In some settings, particularly Sub-Saharan Africa, there is a high prevalence of HIV infection and a high burden of vaccine-preventable diseases. There is evidence suggesting that the immunity induced by some commonly used vaccines is not durable in HIV-infected persons, and therefore, repeated vaccination may be considered to ensure optimal vaccine-induced immunity in this population. However, some vaccines, particularly the live vaccines, may be unsafe in HIV-infected persons. There is lack of evidence on the safety profile of commonly used vaccines among HIV-infected persons. We are therefore conducting a systematic review to assess the safety profile of routine vaccines administered to HIV-infected persons. Methods/Design We will select studies conducted in any setting where licensed and effective vaccines were administered to HIV-infected persons. We will search for eligible studies in PubMed, Web of Science, Cochrane Central Register of Controlled Trials (CENTRAL), Scopus, Africa-Wide, PDQ-Evidence and CINAHL as well as reference lists of relevant publications. We will screen search outputs, select studies and extract data in duplicate, resolving discrepancies by discussion and consensus. Discussion Globally, immunisation is a major public health strategy to mitigate morbidity and mortality caused by various infectious disease-causing agents. In general, there are efforts to increase vaccination coverage worldwide, and for these efforts to be successful, safety of the vaccines is paramount, even among people living with HIV, who in some situations may require repeated vaccination. Results from this systematic review will be discussed in the context of the safety of routine vaccines among HIV-infected persons. From the safety perspective, we will also discuss whether repeat vaccination strategies may be

  7. Issues and relationships among software standards for nuclear safety applications. Version 2.0

    International Nuclear Information System (INIS)

    Scott, J.A.; Preckshot, G.G.; Lawrence, J.D.; Johnson, G.L.

    1996-01-01

    Lawrence Livermore National Laboratory is assisting the Nuclear Regulatory Commission with the development of draft regulatory guides for selected software engineering standards. This report describes the results of the initial task in this work. The selected software standards and a set of related software engineering standards were reviewed, and the resulting preliminary elements of the regulatory positions are identified in this report. The importance of a thorough understanding of the relationships among standards useful for developing safety-related software is emphasized. The relationship of this work to the update of the Standard Review Plan is also discussed

  8. European Union response to Fukushima. European stress tests and peer review

    Energy Technology Data Exchange (ETDEWEB)

    Jamet, Philippe [Autorite de Surete Nucleaire (ASN), Paris (France)

    2012-07-01

    Following the severe accidents which started in the Fukushima Dai-ichi NPP on 11 March 2011, the European Council requested that a comprehensive safety and risk assessment, in light of preliminary lessons learned, be performed on all EU nuclear plants. Therefore, stress tests and peer review assessing natural initiating events, the loss of safety systems and severe accident management have been performed in the 15 European Union countries with nuclear power plants as well as Switzerland and Ukraine. The final peer review report of the European Nuclear Safety Regulators Group (ENSREG) highlights four main areas for improvement to be explored across Europe: 1. Development by the Western European Nuclear Regulators' Association (WENRA), with the contribution of the best available EU expertise, of a European guidance on assessment of natural hazards and margins; 2. Importance of Periodic Safety Review to be underlined by ENSREG; 3. Expeditious implementation of the recognised measures to protect containment integrity; 4. Prevention of accidents resulting from natural hazards and limitation of their consequences. The peer review of the European stress tests was completed in April 2012. In their conclusive statement issued 26 April 2012, the national European regulators and the European Commission as European Nuclear Safety Regulators Group (ENSREG) required that follow-up would occur by way of an ENSREG action plan. Country specific action plans will be developed and peer review workshop will be organised to share lessons learned on the implementation of post-Fukushima safety improvements.

  9. European Union response to Fukushima. European stress tests and peer review

    International Nuclear Information System (INIS)

    Jamet, Philippe

    2012-01-01

    Following the severe accidents which started in the Fukushima Dai-ichi NPP on 11 March 2011, the European Council requested that a comprehensive safety and risk assessment, in light of preliminary lessons learned, be performed on all EU nuclear plants. Therefore, stress tests and peer review assessing natural initiating events, the loss of safety systems and severe accident management have been performed in the 15 European Union countries with nuclear power plants as well as Switzerland and Ukraine. The final peer review report of the European Nuclear Safety Regulators Group (ENSREG) highlights four main areas for improvement to be explored across Europe: 1. Development by the Western European Nuclear Regulators' Association (WENRA), with the contribution of the best available EU expertise, of a European guidance on assessment of natural hazards and margins; 2. Importance of Periodic Safety Review to be underlined by ENSREG; 3. Expeditious implementation of the recognised measures to protect containment integrity; 4. Prevention of accidents resulting from natural hazards and limitation of their consequences. The peer review of the European stress tests was completed in April 2012. In their conclusive statement issued 26 April 2012, the national European regulators and the European Commission as European Nuclear Safety Regulators Group (ENSREG) required that follow-up would occur by way of an ENSREG action plan. Country specific action plans will be developed and peer review workshop will be organised to share lessons learned on the implementation of post-Fukushima safety improvements.

  10. ORSERG resource book. Operational reactor safety engineering and review group. Final report, March 1992

    International Nuclear Information System (INIS)

    1992-03-01

    EPRI has prepared this resource book to help utilities with their Self-Assessment Programs at nuclear power plants. Self-assessments are reviews performed by nuclear power plant utilities to monitor plant performance status and adequacy, identify trends in operational activities important to safety, and assess the impact of these trends on plant safety. Activities performed as self-assessments include reviews and evaluations of plant performance and abnormal events, technical evaluations of plant activities to identify potential problem areas, and reviews of other sources of plant design and operating experience for applicability to safety. This resource book is based on information obtained from utilities and includes examples of activities and methods that have proven effective. The resource book includes a summary of NRC requirements, guidelines for self-assessment program planning, descriptions and examples of investigative techniques, and key references that can be consulted for additional information. It can serve as a training guide for plant staff members who are assigned to self-assessment activities. (author)

  11. BIPS-FS preliminary design, miscellaneous notes

    International Nuclear Information System (INIS)

    1976-01-01

    A compendium of flight system preliminary design internal memos and progress report extracts for the Brayton Isotope Power System Preliminary Design Review to be held July 20, 21, and 22, 1975 is presented. The purpose is to bring together those published items which relate only to the preliminary design of the Flight System, Task 2 of Phase I. This preliminary design effort was required to ensure that the Ground Demonstration System will represent the Flight System as closely as possible

  12. 78 FR 4477 - Review of Safety Analysis Reports for Nuclear Power Plants, Introduction

    Science.gov (United States)

    2013-01-22

    ... Analysis Reports for Nuclear Power Plants: LWR Edition.'' The new subsection is the Standard Review Plan... Nuclear Power Plants: Integral Pressurized Water Reactor (iPWR) Edition.'' DATES: Comments must be filed... NUCLEAR REGULATORY COMMISSION [NRC-2012-0268] Review of Safety Analysis Reports for Nuclear Power...

  13. Preliminary hazards analysis -- vitrification process

    International Nuclear Information System (INIS)

    Coordes, D.; Ruggieri, M.; Russell, J.; TenBrook, W.; Yimbo, P.

    1994-06-01

    This paper presents a Preliminary Hazards Analysis (PHA) for mixed waste vitrification by joule heating. The purpose of performing a PHA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PHA is then followed by a Preliminary Safety Analysis Report (PSAR) performed during Title 1 and 2 design. The PSAR then leads to performance of the Final Safety Analysis Report performed during the facility's construction and testing. It should be completed before routine operation of the facility commences. This PHA addresses the first four chapters of the safety analysis process, in accordance with the requirements of DOE Safety Guidelines in SG 830.110. The hazards associated with vitrification processes are evaluated using standard safety analysis methods which include: identification of credible potential hazardous energy sources; identification of preventative features of the facility or system; identification of mitigative features; and analyses of credible hazards. Maximal facility inventories of radioactive and hazardous materials are postulated to evaluate worst case accident consequences. These inventories were based on DOE-STD-1027-92 guidance and the surrogate waste streams defined by Mayberry, et al. Radiological assessments indicate that a facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous materials assessment indicates that a Mixed Waste Vitrification facility will be a Low Hazard facility having minimal impacts to offsite personnel and the environment

  14. Preliminary hazards analysis -- vitrification process

    Energy Technology Data Exchange (ETDEWEB)

    Coordes, D.; Ruggieri, M.; Russell, J.; TenBrook, W.; Yimbo, P. [Science Applications International Corp., Pleasanton, CA (United States)

    1994-06-01

    This paper presents a Preliminary Hazards Analysis (PHA) for mixed waste vitrification by joule heating. The purpose of performing a PHA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PHA is then followed by a Preliminary Safety Analysis Report (PSAR) performed during Title 1 and 2 design. The PSAR then leads to performance of the Final Safety Analysis Report performed during the facility`s construction and testing. It should be completed before routine operation of the facility commences. This PHA addresses the first four chapters of the safety analysis process, in accordance with the requirements of DOE Safety Guidelines in SG 830.110. The hazards associated with vitrification processes are evaluated using standard safety analysis methods which include: identification of credible potential hazardous energy sources; identification of preventative features of the facility or system; identification of mitigative features; and analyses of credible hazards. Maximal facility inventories of radioactive and hazardous materials are postulated to evaluate worst case accident consequences. These inventories were based on DOE-STD-1027-92 guidance and the surrogate waste streams defined by Mayberry, et al. Radiological assessments indicate that a facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous materials assessment indicates that a Mixed Waste Vitrification facility will be a Low Hazard facility having minimal impacts to offsite personnel and the environment.

  15. Fission, critical mass and safety-a historical review

    International Nuclear Information System (INIS)

    Meggitt, Geoff

    2006-01-01

    Since the discovery of fission, the notion of a chain reaction in a critical mass releasing massive amounts of energy has haunted physicists. The possibility of a bomb or a reactor prompted much of the early work on determining a critical mass, but the need to avoid an accidental critical excursion during processing or transport of fissile material drove much that took place subsequently. Because of the variety of possible situations that might arise, it took some time to develop adequate theoretical tools for criticality safety and the early assessments were based on direct experiment. Some extension of these experiments to closely similar situations proved possible, but it was not until the 1960s that theoretical methods (and computers to run them) developed enough for them to become reliable assessment tools. Validating such theoretical methods remained a concern, but by the end of the century they formed the backbone of criticality safety assessment. This paper traces the evolution of these methods, principally in the UK and USA, and summarises some related work concerned with the nature of criticality accidents and their radiological consequences. It also indicates how the results have been communicated and used in ensuring nuclear safety. (review)

  16. Review on the role of nuclear power

    International Nuclear Information System (INIS)

    Cao Chi; Le Van Hong; Nguyen Tri Ho

    1993-03-01

    This report consists of 2 parts. The first part reviews opinions against nuclear power on the aspects: waste disposal, safety and environment, financial; technology, etc. and gives results of a preliminary survey for nuclear power in Vietnam among scientists in 1990. The second part presents advanced reactor concepts and advantages of nuclear power to economy and environment in comparison with other energy sources. (N.H.A). 39 refs, 9 figs, 2 tabs

  17. Safety indicators: an efficient tool for a better safety

    International Nuclear Information System (INIS)

    Aufort, P.; Lars, R.

    1993-01-01

    Safety indicators based on the examination of the Operating Technical Specifications have been defined with the aim of following the in-operation safety level of French nuclear power plants. These safety indicators are operation feedback tools which permit the a posteriori justification and the adjustment of actual procedures. They would allow detection of an abnormal unavailability occurrence rate or a situation revealing a potential safety problem. So, data acquisition, processing, analysis and display software allowing trend analysis of these indicators has been developed so far as: a reflexion tool for the power plant operators about the safety instructions and the adjustment of preventive maintenance, and a help for decision making at a national level for the examination and the improvement of Operating Technical Specifications. This paper presents the objectives of these safety indicators, the processing tool associated, the preliminary results obtained and more elaborate processing of these indicators. These safety indicators may be very useful in framing probabilistic safety assessments. (author)

  18. Preliminary perspectives gaines from individual plant examination of external events (IPEEE) seismic and fire submittal review

    International Nuclear Information System (INIS)

    Chen, J.T.; Connell, E.; Chokshi, N.

    1997-01-01

    As a result of the U.S. Nuclear Regulatory Commission (USNRC) initiated Individual plant Examination of External Events (IPEEE) program, every operating nuclear power reactor in the United States has performed an assessment of severe accident due to external events. This paper provides a summary of the preliminary insights gained through the review of 24 IPEEE submittals

  19. Review of the safety analysis of the Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    Weber, J.P.

    1999-01-01

    Description of the review of safety analysis report (SAR) of Ignalina NPP is presented. this review, called RSR, was conducted by independent group of international experts. SAR and RSR represented a unique international effort in a very short time. It was first attempt to provide Western-type SAR for any Soviet designed NPP. SAR was completed in December 1996, RSR was completed in March 1997. SAR has produced 85 reports, available on CR-ROM and RSR produced 86 reports also available on CD-ROM. SAR presented a large list of recommendations. RSR agreed with most of SAR recommendations and added further recommendations. SAR and RSR contributed significantly to better understanding of RBMK plant behaviour. Ignalina NPP has responded to the SAR/RSR recommendations by an ambitious Safety Improvement Programme SIP-2 which currently is under implementation

  20. Magnetic resonance imaging: hazard, risk and safety

    International Nuclear Information System (INIS)

    Narayan, Pradeep; Suri, S.; Singh, P.

    2001-01-01

    The hazard and risk associated with magnetic resonance imaging is a matter of concern. In 1982, the Food and Drug Administration (FDA), USA issued guidelines to Hospital's Investigational Review Board (IRBs) in 'Guidelines for Evaluating Electromagnetic Exposure Risks for Trials of Clinical Nuclear Magnetic Resonance (NMR)'. In 1997, the Berufsgenossenschaft (BG), professional association for precision engineering and electronics of Germany, in their preliminary proposal for safety limits extended their concerns on static magnetic field. Owing to both time varying and static magnetic fields applied in Magnetic Resonance Imaging (MRI) this became of immediate concern to user community to assess the potential hazard and risk associated with the NMR system

  1. Can patients report patient safety incidents in a hospital setting? A systematic review.

    Science.gov (United States)

    Ward, Jane K; Armitage, Gerry

    2012-08-01

    Patients are increasingly being thought of as central to patient safety. A small but growing body of work suggests that patients may have a role in reporting patient safety problems within a hospital setting. This review considers this disparate body of work, aiming to establish a collective view on hospital-based patient reporting. This review asks: (a) What can patients report? (b) In what settings can they report? (c) At what times have patients been asked to report? (d) How have patients been asked to report? 5 databases (MEDLINE, EMBASE, CINAHL, (Kings Fund) HMIC and PsycINFO) were searched for published literature on patient reporting of patient safety 'problems' (a number of search terms were utilised) within a hospital setting. In addition, reference lists of all included papers were checked for relevant literature. 13 papers were included within this review. All included papers were quality assessed using a framework for comparing both qualitative and quantitative designs, and reviewed in line with the study objectives. Patients are clearly in a position to report on patient safety, but included papers varied considerably in focus, design and analysis, with all papers lacking a theoretical underpinning. In all papers, reports were actively solicited from patients, with no evidence currently supporting spontaneous reporting. The impact of timing upon accuracy of information has yet to be established, and many vulnerable patients are not currently being included in patient reporting studies, potentially introducing bias and underestimating the scale of patient reporting. The future of patient reporting may well be as part of an 'error detection jigsaw' used alongside other methods as part of a quality improvement toolkit.

  2. [Patient safety in home care - A review of international recommendations].

    Science.gov (United States)

    Czakert, Judith; Lehmann, Yvonne; Ewers, Michael

    2018-06-08

    In recent years there has been a growing trend towards nursing care at home in general as well as towards intensive home care being provided by specialized home care services in Germany. However, resulting challenges for patient safety have rarely been considered. Against this background we aimed to explore whether international recommendations for patient safety in home care in general and in intensive home care in particular already exist and how they can stimulate further practice development in Germany. A review of online English documents containing recommendations for patient safety in intensive home care was conducted. Available documents were analyzed and compared in terms of their form and content. Overall, a small number of relevant documents could be identified. None of these documents exclusively refer to the intensive home care sector. Despite their differences, however, the analysis of four selected documents showed similarities, e. g., regarding specific topics of patient safety (communication, involvement of patients and their relatives, risk assessment, medication management, qualification). Furthermore, strengths and weaknesses of the documents became apparent: e. g., an explicit understanding of patient safety, a literature-based introduction to safety topics or an adaptation of the recommendations to the specific features of home care were occasionally lacking. This document analysis provides interesting input to the formal and content-related development of specific recommendations and to practice development in Germany to improve patient safety in home care. Copyright © 2018. Published by Elsevier GmbH.

  3. Safety Experts Complete IAEA Nuclear Regulatory Review of the United States

    International Nuclear Information System (INIS)

    2010-01-01

    Full text: An international team of senior nuclear safety experts today completed a two-week International Atomic Energy Agency (IAEA) review of the governmental and regulatory framework for nuclear safety in the United States. The team identified good practices within the U.S. system and offered suggestions for ways the U.S. Nuclear Regulatory Commission (NRC) could improve. The IAEA has conveyed the team's main conclusions to the NRC, and a final report will be submitted to the NRC in about two months. At the request of the United States, the IAEA assembled a team of 19 international experts to conduct an Integrated Regulatory Review Service (IRRS) mission. This mission was a peer review based on the IAEA Safety Standards. It was not an inspection, nor an audit. The experts came from 14 different countries: Canada, China, the Czech Republic, Finland, France, Italy, Japan, Mexico, the Republic of Korea, Slovenia, Spain, Sweden, Switzerland, and the United Kingdom. Team leader Jukka Laaksonen of Finland said: ''We found a comprehensive, consistent, and mature regulatory system run by the NRC, which has a strong drive for continuous improvement.' The scope of the mission included the U.S. regulatory framework and the regulation of the nuclear plant operation. The mission was conducted from 18 to 29 October, mainly at NRC headquarters outside of Washington, D.C. To study U.S. regulatory activities, the mission conducted a series of interviews and discussions with NRC staff and other organizations to help assess the effectiveness of the regulatory system. In addition, the team observed regulatory activities at two operating nuclear power reactors and an emergency preparedness exercise. The IAEA's IRRS coordinator Gustavo Caruso said, ''This mission represents a milestone for the IRRS program because the U.S. regulatory system is the largest in the world and many nations look to it. The IRRS is a useful tool that allows host nations to gain guidance from experienced

  4. Regulatory review of probabilistic safety assessment (PSA) level 1

    International Nuclear Information System (INIS)

    2000-02-01

    Probabilistic safety assessment (PSA) is increasingly being used as part of the decision making process to assess the level of safety of nuclear power plants. The methodologies in use are maturing and the insights gained from the PSAs are being used along with those from the deterministic analysis. Many regulatory authorities consider that the current state of the art in PSA (especially Level 1 PSA) is sufficiently well developed that it can be used centrally in the regulatory decision making process - referred to as 'risk informed regulation'. For these applications to be successful, it will be necessary for regulatory authorities to have a high degree of confidence in PSA. However, at the IAEA Technical Committee Meeting on Use of PSA in the Regulatory Process in 1994 and at the OECD Nuclear Energy Agency Committee for Nuclear Regulatory Activities (CNRA) 'Special Issues' Meeting in 1997 on Review Procedures and Criteria for Different Regulatory Applications of PSA, it was recognized that formal regulatory review guidance for PSA did not exist. The senior regulators noted that there was a need to produce some international guidance for reviewing PSAs to establish an agreed basis for assessing whether important technological and methodological issues in PSAs are treated adequately and to verify that conclusions reached are appropriate. In 1997 the IAEA and OECD Nuclear Energy Agency agreed to produce in co-operation a technical document on the regulatory review of PSA. This publication is intended to provide guidance to regulatory authorities on how to review the PSA for a nuclear power plant to gain confidence that it has been carried out to an acceptable standard so that it can be used as the basis for taking risk informed decisions within a regulatory decision making process. The document gives guidance on how to set about reviewing a PSA and on the technical issues that need to be addressed. This publication gives guidance for the review of Level 1 PSA for

  5. Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Higgins, J.; Fleger, Stephen

    2011-01-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.

  6. AGI Safety Literature Review

    OpenAIRE

    Everitt, Tom; Lea, Gary; Hutter, Marcus

    2018-01-01

    The development of Artificial General Intelligence (AGI) promises to be a major event. Along with its many potential benefits, it also raises serious safety concerns (Bostrom, 2014). The intention of this paper is to provide an easily accessible and up-to-date collection of references for the emerging field of AGI safety. A significant number of safety problems for AGI have been identified. We list these, and survey recent research on solving them. We also cover works on how best to think of ...

  7. Nuclear Safety Review for the Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-15

    The contents of this Nuclear Safety Review reflect the emerging nuclear safety trends, issues and challenges for 2010, as well as recapitulate the Agency's activities intended to further strengthen the global nuclear safety and security framework in all areas of nuclear, radiation, waste and transport safety. Nuclear power plant safety performance remained high, and indicated an improved trend in the number of emergency shutdowns as well in the level of energy available during these shutdowns. In addition, more States explored or expanded their interests in nuclear power programmes, and more faced the challenge of establishing the required regulatory infrastructure, regulatory supervision and safety management over nuclear installations and the use of ionizing radiation. Issues surrounding radiation protection and radioecology continued as trends in 2010. For example, increased public awareness of exposure to and environmental impacts of naturally occurring radioactive material (NORM) as well as nuclear legacy sites has led to increased public concern. In addition, human resources in radiation protection and radioecology have been lost as a result of retirement and of the migration of experts to other fields. It is clear that safety continues to be a work in progress. The global nuclear power industry continued to require substantial efforts by designers, manufacturers, operators, regulators and other stakeholders to satisfy diverse quality and safety requirements and licensing processes, along with the recognized need in industry and among regulators to standardize and harmonize these requirements and processes. In some cases, plans for nuclear power programme development moved faster than the establishment of the necessary regulatory and safety infrastructure and capacity. To assist Member States in this effort, the Regulatory Cooperation Forum (RCF) was formed in June 2010. The RCF is a regulator-to-regulator forum that optimizes regulatory support from Member

  8. An updated status of Department of Energy safety reviews of packages for transporting radioactive material

    International Nuclear Information System (INIS)

    Kapoor, A.

    1995-01-01

    The Department of Energy conducts conformance reviews and issues Certificates of Compliance for Type B packaging for radioactive materials. Several offices within DOE perform these reviews which are required by the Department of Transportation to be to the regulations promulgated by the Nuclear Regulatory Commission or their safety equivalent. This paper focuses on one of these offices, the Office of Facility Safety Analysis, EH-32, which is responsible for reviewing and certifying packages other than those used for weapons and weapons component, for Naval Reactors, and for Civilian Radioactive Waste Management. This paper gives the background and organizational history of EH-32, discusses the version of regulations to which the packaging is reviewed, updates the status of these reviews, describes the effectiveness of the reviews, updates the training courses sponsored by EH-32, and mentions the new Quality Assurance Evaluations being started by EH-32

  9. The safety of Ontario's nuclear power reactors. A scientific and technical review. A submission to the Ontario Nuclear Safety Review by Atomic Energy Canada Limited

    International Nuclear Information System (INIS)

    1987-01-01

    This submission comments on the evolution of the Canadian nuclear program, the management of safety, and the reactor design, analysis, operation and research programs that contribute to the safety of the CANDU reactor and provide assurance of safety to the regulatory agency and to the public. The CANDU reactor system has been designed and developed with close cooperation between Atomic Energy of Canada Ltd. (AECL), utilities, manufacturers, and the Atomic Energy Control Board (AECB). The AECB has the responsibility, on behalf of the public, for establishing acceptable standards with respect to public risk and for establishing through independent review that these standards are satisfied. The plant designer has responsibility for defining how those standards will be met. The plant operator has responsibility for operating within the framework of those standards. The Canadian approach to safety design is based on the philosophy of defence in depth. Defence in depth is achieved through a high level of equipment quality, system redundancy and fail-safe design; regulating and process systems designed to maintain all process systems within acceptable operating parameters; and, independent safety systems to shut down the reactor, provide long-term cooling, and contain potential release of radioactivity in the event of an accident. The resulting design meets regulatory requirements not only in Canada but also in other countries. Probabilistic safety and risk evaluations show that the CANDU design offers a level of safety and least as good as other commercially available reactor designs

  10. International Nuclear and Radiation Safety Experts Conclude IAEA Peer Review of Slovenia's Regulatory System

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of senior nuclear safety experts today concluded a 10-day mission to review the regulatory framework for nuclear and radiation safety in Slovenia. The team identified good practices and gave advice on areas for future improvements. The IAEA has conveyed the team's main conclusions to the Government of Slovenia and a final report will be submitted by the end of 2011. At the request of the Slovenian Government, the IAEA assembled a team of 10 senior regulatory experts from nine nations to conduct the Integrated Regulatory Review Service (IRRS) mission involving the Slovenian Nuclear Safety Administration (SNSA). The mission is a peer review based on the IAEA Safety Standards. Andrej Stritar, Director of Slovenian Nuclear Safety Administration, stressed ''how important it is for a small country like Slovenia to tightly follow international standards in the area of nuclear safety.'' He also expressed his gratitude to the IAEA, and the countries from which team members came, for their support and for their intensive work during the last ten days. Mission Team Leader Colin Patchett, Deputy Chief Inspector from the UK's Office for Nuclear Regulation commended ''the Slovenian authorities for their commitment to nuclear and radiation safety regulation and for sharing their experience.'' The IRRS team reviewed Slovenia's current regulatory framework and all SNSA-regulated facilities and activities, as well as the regulatory implications of the TEPCO Fukushima Daiichi accident. The IRRS team identified particular strengths in the Slovenian regulatory system, including: Through its legal framework, the Slovenian government has appointed SNSA to regulate its nuclear safety program and SNSA has in place an effective process for carrying out this responsibility; and Slovenia's response to the accident at the TEPCO Fukushima Daiichi power plant has been prompt and effective. Communications with the public, development of actions for improvement

  11. Standard Review Plan for the review of safety analysis reports for nuclear power plants, Revision No. 7 to Section 9

    International Nuclear Information System (INIS)

    1978-03-01

    Revision No. 1 to Section 9 of the Standard Review Plan incorporates changes that have been developed since the original issuance in September 1975, many of which are editorial in nature, to reflect current staff practice in the review of safety analysis reports for nuclear power plants

  12. Applicability and feasibility of systematic review for performing evidence-based risk assessment in food and feed safety

    DEFF Research Database (Denmark)

    Aiassa, E.; Higgins, J.P.T.; Frampton, G. K.

    2015-01-01

    for answering questions in health care, and can be implemented to minimise biases in food and feed safety risk assessment. However, no methodological frameworks exist for refining risk assessment multi-parameter models into questions suitable for systematic review, and use of meta-analysis to estimate all......Food and feed safety risk assessment uses multi-parameter models to evaluate the likelihood of adverse events associated with exposure to hazards in human health, plant health, animal health, animal welfare and the environment. Systematic review and meta-analysis are established methods...... parameters in the risk model. This approach to planning and prioritising systematic review seems to have useful implications for producing evidence-based food and feed safety risk assessment....

  13. Elastic and inelastic methods of piping systems analysis: a preliminary review

    International Nuclear Information System (INIS)

    Reich, M.; Esztergar, E.P.; Spence, J.; Boyle, J.; Chang, T.Y.

    1975-02-01

    A preliminary review of the methods used for elastic and inelastic piping system analysis is presented. The following principal conclusions are reached: techniques for the analysis of complex piping systems operating in the high temperature creep regime should be further developed; accurate analysis of a complete pipework system in creep using the ''complete shell finite element methods'' is not feasible at the present, and the ''reduced shell finite element method'' still requires excessive computer time and also requires further investigation regarding the compatibility problems associated with the pipe bend element, particularly when applied to cases involving general loading conditions; and with the current size of proposed high temperature systems requiring the evaluation of long-term operating life (30 to 40 years), it is important to adopt a simplified analysis method. A design procedure for a simplified analysis method based on currently available techniques applied in a three-stage approach is outlined. The work required for implementation of these procedures together with desirable future developments are also briefly discussed. Other proposed simplified approximations also are reviewed in the text. 101 references. (U.S.)

  14. Technical Safety Appraisal of the Pinellas Plant

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents the Technical Safety Appraisal (TSA) of the Pinellas Plant in Pinellas County, Florida. The plant is owned and controlled by the US Department of Energy and operated by General Electric Neutron Devices (GEND). The TSA was performed during the period January 15--31, 1989, in support of a Tiger Team Assessment which occurred during the period January 15 to February 2, 1989. The TSA provided the Safety and Health Subteam input to the Tiger Team Assessment. The completion of the assessment process includes: (1) submission of the Team's preliminary findings and concerns, in a Draft Report, to the Manager, Albuquerque Operations Office and to the site contractors at the conclusion of the onsite assessment; (2) review of the Draft Report for technical and factual accuracy; incorporation of the appropriate review comments, suggested changes, and modifications, as well as input from all interested Program Secretarial Offices; preparation of a draft Action Plan by the Albuquerque Operations Office to address the Concerns, and submittal of that Action Plan through the Program Office to ES ampersand H for their review and comment. The Secretary approved the final Action Plan on December 16, 1990, and directed its implementation. The comments and suggestions of the Program Secretarial Offices, the Operations Office, and the site contractor have been incorporated, as appropriate, in this report prior to its publication

  15. Whole blood pathogen reduction technology and blood safety in sub-Saharan Africa: A systematic review with regional discussion

    OpenAIRE

    Nkohkwo, Asa?ah; Agbor, Gabriel; Asongalem, Emmanuel; Tagny, Claude; Asonganyi, Tazoacha

    2016-01-01

    Background: Despite vast improvements in transfusion services in sub-Saharan Africa over the last decade, there remain serious concerns on the safety and adequacy of the blood supply across the region. Objective: This review paper ascertains the role of pathogen reduction technology (PRT) in improving blood safety and supply adequacy in the region. Method: The state of blood safety in sub-Saharan Africa was reviewed. Meetings, seminars and correspondence were undertaken with key clinic...

  16. PSA in licensing, safety reviews and design as applied in Germany

    International Nuclear Information System (INIS)

    Berg, H.P.; Goertz, R.; Schott, H.; Wendling, R.D.

    1994-01-01

    In this paper, two topics - the application of PSA in the regulatory process and the effort to improve PSA methods and models - are addressed. From the regulators' point of view, the most important application of PSA in Germany is presently within the safety reviews of nuclear power plants in operation. The current status of regulatory guidance which shall be provided to establish a uniform procedure for a periodic safety review is described with special emphasis on the role of PSA. An important goal is to have all plant-specific PSAs comparable as far as possible. Guidance for PSA review is under development likewise. Furthermore, the application of PSA in licensing of nuclear power plants is addressed as well as its use in the design process of future pressurized water reactors. The development of models and methods to be applied in PSA has been and will be supported by a number of studies and investigations. An overview of the main issues of these investigations is provided. A specific task was the elaboration of a proposal for incorporating fire events into the PSA. The status of these efforts is outlined. (author). 7 refs, 3 figs, 2 tabs

  17. International nuclear safety experts conclude IAEA peer review of Canada's regulatory system

    International Nuclear Information System (INIS)

    2009-01-01

    Full text: An international team of nuclear safety experts today completed a two-week IAEA review of the regulatory framework and effectiveness of the Canadian Nuclear Safety Commission (CNSC). The team identified good practices within the system and gave advice on some areas for improvement. The IAEA has conveyed initial findings to Canadian authorities; the final report will be submitted by autumn. The International Atomic Energy Agency (IAEA) assembled a team of nuclear, radiation, and waste safety experts at the request of the Government of Canada, to conduct an Integrated Regulatory Review Service (IRRS) mission. The mission from 31 May to 12 June was a peer review based on IAEA Standards, not an inspection, nor an audit. The scope of the mission included sources, facilities and activities regulated by the CNSC: the operation of nuclear power plants (NPPs), research reactors and fuel cycle facilities; the refurbishment or licensing of new NPPs; uranium mining; radiation protection and environmental protection programmes; and the implementation of IAEA Code of Conduct on Safety and Security of Radioactive Sources. The 21-member team from 13 IAEA States and from the IAEA itself reviewed CNSC's work in all relevant areas: legislative and governmental responsibilities; responsibilities and functions; organization; activities of the regulatory body, including the authorization process, review and assessment, inspection and enforcement, the development of regulations, as well as guides and its the management system of CNSC. The basis for the review was a well-prepared self-assessment by the CNSC, including an evolution of its strengths and proposed actions to improve its regulatory effectiveness. Mr. Shojiro Matsuura, IRRS Team Leader and President of the Japanese Nuclear Safety Research Association, said the team 'was impressed by the extensive preparation at all CNSC staff levels.' 'We identified a number of good practices and made recommendations and suggestions

  18. Review on Dutch-German steam generator safety activities in the field of SNR-development

    International Nuclear Information System (INIS)

    Dumm, K.; Westenbrugge, J.K. van

    1984-01-01

    This paper reviews the results of the experimental and theoretical safety related work for SNR steam generators in brief. A review of the operating experience with SNR-300 sodium-water heat-exchangers and protection philosophy used in SNR-2 is also given

  19. Pediatric regional anesthesia: what is the current safety record?

    Science.gov (United States)

    Polaner, David M; Drescher, Jessica

    2011-07-01

    The use of regional anesthetics, whether as adjuncts, primary anesthetics or postoperative analgesia, is increasingly common in pediatric practice. Data on safety remain limited because of the paucity of very large-scale prospective studies that are necessary to detect low incidence events, although several studies either have been published or have reported preliminary results. This paper will review the data on complications and risk in pediatric regional anesthesia. Information currently available suggests that regional blockade, when performed properly, carries a very low risk of morbidity and mortality in appropriately selected infants and children. © 2010 Blackwell Publishing Ltd.

  20. Preliminary investigation on reliability assessment of passive safety system

    International Nuclear Information System (INIS)

    Huang Changfan; Kuang Bo

    2012-01-01

    The reliability evaluation of passive safety system plays an important part in probabilistic safety assessment (PSA) of nuclear power plant applying passive safety design, which depends quantitatively on reliabilities of passive safety system. According to the object of reliability assessment of passive safety system, relevant parameters are identified. Then passive system behavior during accident scenarios are studied. A practical example of this method is given for the case of reliability assessment of AP1000 passive heat removal system in loss of normal feedwater accident. Key and design parameters of PRHRS are identified and functional failure criteria are established. Parameter combinations acquired by Latin hyper~ cube sampling (LHS) in possible parametric ranges are input and calculations of uncertainty propagation through RELAP5/MOD3 code are carried out. Based on the calculations, sensitivity assessment on PRHRS functional criteria and reliability evaluation of the system are presented, which might provide further PSA with PRHR system reliability. (authors)

  1. Safety experts complete second IAEA regulatory review of UK nuclear regulator

    International Nuclear Information System (INIS)

    2009-01-01

    Full text: Nuclear safety experts today concluded a 10-day mission to peer-review the UK Nuclear Regulator: Health and Safety Executive (HSE), Nuclear Directorate (ND). At the request of the UK Government, the International Atomic Energy Agency assembled a team of ten high-level regulatory experts from eight nations to conduct the Integrated Regulatory Review Service (IRRS) mission. The mission was the second of three planned IRRS missions for the United Kingdom. The first was held in March 2006 to begin a process to assess the nation's readiness to regulate and license new reactor designs, considered as a result of the Energy Policy review initiated by the British Prime Minister and the Secretary of State for Trade and Industry (DTI) in 2005. The IRRS team leader Mr. William Borchardt, Executive Director of Operations from the US Nuclear Regulatory Commission, stated, ''The IAEA IRRS serves an important role in both benchmarking against its safety standards and in promoting dialogue between nuclear safety regulators from around the world.'' During the 2nd mission the IRRS the team reviewed HSE/ND progress since the first IRRS mission and recent regulatory developments, the regulation of operating power plants and fuel cycle facilities, the inspection and enforcement programme for nuclear power plants and fuel cycle facilities, and the emergency preparedness and response programme. The IAEA found that HSE/ND has made significant progress toward improving its effectiveness in regulating existing nuclear power plants and in preparing to license new nuclear reactors designs. Many of the findings identified in the 2006 report had been fully addressed and therefore could be considered closed, the others are being addressed in accordance with a comprehensive action plan. IRRS team members visited the Heysham 1 Nuclear Power Plant near Lancaster, the Sellafield site at Cumbria and the Strategic Control Centre at Hutton, and they met senior managers from HSE and a UK

  2. Review of Safety and Security of Radioactive Sources in Africa

    International Nuclear Information System (INIS)

    Kiti, Shadrack Anthony; Choi, Kwang Sik

    2011-01-01

    Radioactive materials are used worldwide for peaceful applications in medicine, industry, agriculture, environmental science, education and research and military applications. Most of these radioactive sources used are imported therefore trans-boundary movement is a significant factor in consideration of safety and security measures during movement of these sources. It is estimated that 20 million packages of radioactive materials are transported annually worldwide and this number of shipments is expected to increase due to the renaissance of nuclear power generation. The African continent has shown considerable leadership in its advocacy for the safety and security of radioactive sources. The First Africa Workshop on the Establishment of a Legal Framework governing Radiation Protection, the Safety of Radiation Sources and the Safe Management of Radioactive Waste held in Ethiopia in 2001 called upon the IAEA to form a forum for African countries to consider the Code of Conduct on the Safety and Security of Radioactive Sources and give it a legally binding effect so that the peaceful use of nuclear technology is not compromised. Despite these laudable efforts, Africa still faces considerable challenges in the implementation of safety and security of radioactive sources because of weak regulatory control and lack of infrastructure to properly control, manage and secure radiation sources 1 . The purpose of this paper was therefore, to analyze, review, address and share knowledge and experience with regard to safety and security measures of radioactive materials in Africa. This project will benefit IAEA's African member states in creating nuclear safety and security networking in the region

  3. Status and some safety philosophies of the China advanced research reactor CARR

    International Nuclear Information System (INIS)

    Luzheng Yuan

    2001-01-01

    The existing two research reactors, HWRR (heavy water research reactor) and SPR (swimming pool reactor), have been operated by China Institute of Atomic Energy (CIAE) since, respectively, 1958 and 1964, and are both in extending service and facing the aging problem. It is expected that they will be out of service successively in the beginning decade of the 21 st century. A new, high performance and multipurpose research reactor called China advanced research reactor (CARR) will replace these two reactors. This new reactor adopts the concept of inverse neutron trap compact core structure with light water as coolant and heavy water as the outer reflector. Its design goal is as follows: under the nuclear power of 60MW, the maximum unperturbed thermal neutron flux in peripheral D 2 O reflector not less than 8 x 10 14 n/cm 2 . s while in central experimental channel, if the central cell to be replaced by an experimental channel, the corresponding value not less than 1 x 10 15 n/cm 2 . s. The main applications for this research reactor will cover RI production, neutron scattering experiments, NAA and its applications, neutron photography, NTD for monocrystaline silicon and applications on reactor engineering technology. By the end of 1999, the preliminary design of CARR was completed, then the draft of preliminary safety analysis report (PSAR) was submitted to the relevant authority at the end of 2000 for being reviewed. Now, the CARR project has entered the detail design phase and safety reviewing procedure for obtaining the construction permit from the relevant licensing authority. This paper will only briefly introduce some aspects of safety philosophy of CARR design and PSAR. (orig.)

  4. Common issues found in operating safety peer review of nuclear power plants

    International Nuclear Information System (INIS)

    Wu Meijing; Zhang Fengping

    2004-01-01

    The 3rd stage of the safety culture promotion in a Nuclear Power Plant (NPP) is characterized by establishing learning organization and continuous self-improvement. Peer Review was used as an effective tool by a lot of NPPs to improve the overall management and performance. This Paper provided the WANO Peer Review Methodology, the common issues found, the recommendation or suggestions to correct the area for improvement. It may be beneficial to other NPP which planning to have Peer Review or Self Evaluation. (authors)

  5. The CABRI facility: Implementation of a pressurized water loop and related safety review

    International Nuclear Information System (INIS)

    Cabrillat, J.C.; Maegey, M.; Bourguignon, D.; Miachon, G.; Forestier, F.; Coulon, J.P.; Faury, M.

    2003-01-01

    The CABRI reactor operated by CEA at the CADARACHE Nuclear Center in France provided the condition for safety studies on nuclear fuel. Initially designed to support investigations on Fast Reactor fuel, large modifications are underway to provide representative conditions for studies on Light Water Fuel types. A general overview of these modifications, the related safety review and supporting studies are described in the paper. (author)

  6. Advanced Photon Source experimental beamline Safety Assessment Document: Addendum to the Advanced Photon Source Accelerator Systems Safety Assessment Document (APS-3.2.2.1.0)

    International Nuclear Information System (INIS)

    1995-01-01

    This Safety Assessment Document (SAD) addresses commissioning and operation of the experimental beamlines at the Advanced Photon Source (APS). Purpose of this document is to identify and describe the hazards associated with commissioning and operation of these beamlines and to document the measures taken to minimize these hazards and mitigate the hazard consequences. The potential hazards associated with the commissioning and operation of the APS facility have been identified and analyzed. Physical and administrative controls mitigate identified hazards. No hazard exists in this facility that has not been previously encountered and successfully mitigated in other accelerator and synchrotron radiation research facilities. This document is an updated version of the APS Preliminary Safety Analysis Report (PSAR). During the review of the PSAR in February 1990, the APS was determined to be a Low Hazard Facility. On June 14, 1993, the Acting Director of the Office of Energy Research endorsed the designation of the APS as a Low Hazard Facility, and this Safety Assessment Document supports that designation

  7. Workforce perceptions of hospital safety culture: development and validation of the patient safety climate in healthcare organizations survey.

    Science.gov (United States)

    Singer, Sara; Meterko, Mark; Baker, Laurence; Gaba, David; Falwell, Alyson; Rosen, Amy

    2007-10-01

    To describe the development of an instrument for assessing workforce perceptions of hospital safety culture and to assess its reliability and validity. Primary data collected between March 2004 and May 2005. Personnel from 105 U.S. hospitals completed a 38-item paper and pencil survey. We received 21,496 completed questionnaires, representing a 51 percent response rate. Based on review of existing safety climate surveys, we developed a list of key topics pertinent to maintaining a culture of safety in high-reliability organizations. We developed a draft questionnaire to address these topics and pilot tested it in four preliminary studies of hospital personnel. We modified the questionnaire based on experience and respondent feedback, and distributed the revised version to 42,249 hospital workers. We randomly divided respondents into derivation and validation samples. We applied exploratory factor analysis to responses in the derivation sample. We used those results to create scales in the validation sample, which we subjected to multitrait analysis (MTA). We identified nine constructs, three organizational factors, two unit factors, three individual factors, and one additional factor. Constructs demonstrated substantial convergent and discriminant validity in the MTA. Cronbach's alpha coefficients ranged from 0.50 to 0.89. It is possible to measure key salient features of hospital safety climate using a valid and reliable 38-item survey and appropriate hospital sample sizes. This instrument may be used in further studies to better understand the impact of safety climate on patient safety outcomes.

  8. FMCSA safety program effectiveness measurement : compliance review effectiveness model results for carriers with compliance reviews in FY 2008

    Science.gov (United States)

    2012-09-30

    In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...

  9. Consumer food handling in the home: a review of food safety studies.

    Science.gov (United States)

    Redmond, Elizabeth C; Griffith, Christopher J

    2003-01-01

    Epidemiological data from Europe, North America, Australia, and New Zealand indicate that a substantial proportion of foodborne disease is attributable to improper food preparation practices in consumers' homes. International concern about consumer food safety has prompted considerable research to evaluate domestic food-handling practices. The majority of consumer food safety studies in the last decade have been conducted in the United Kingdom and Northern Ireland (48%) and in the United States (42%). Surveys (questionnaires and interviews), the most frequent means of data collection, were used in 75% of the reviewed studies. Focus groups and observational studies have also been used. One consumer food safety study examined the relationship between pathogenic microbial contamination from raw chicken and observed food-handling behaviors, and the results of this study indicated extensive Campylobacter cross-contamination during food preparation sessions. Limited information about consumers' attitudes and intentions with regard to safe food-handling behaviors has been obtained, although a substantial amount of information about consumer knowledge and self-reported practices is available. Observation studies suggest that substantial numbers of consumers frequently implement unsafe food-handling practices. Knowledge, attitudes, intentions, and self-reported practices did not correspond to observed behaviors, suggesting that observational studies provide a more realistic indication of the food hygiene actions actually used in domestic food preparation. An improvement in consumer food-handling behavior is likely to reduce the risk and incidence of foodborne disease. The need for the development and implementation of food safety education strategies to improve specific food safety behaviors is reviewed in this paper.

  10. How Swedish communities organised themselves in reviewing a safety case

    International Nuclear Information System (INIS)

    Soderblom, Anna-Lena

    2014-01-01

    Full text of publication follows: In 2009 the Swedish nuclear waste management company, SKB, choose Forsmark in the municipality of Oesthammar as the best place for a repository for spent nuclear fuel. In 2011, as a natural follow-up, SKB presented applications to two Swedish authorities, the Land and Environmental Court and the Swedish Radiation Safety Authority. The municipality of Oesthammar has together with the municipality of Oskarshamn been an active part in the process since 1994, with different local organisations financed by the Swedish nuclear fund. Three leading themes form the basis for our participation - voluntarism, complete openness of plans and results and participation with the possibility to influence. Site investigations for a repository started in 2002 and were finished when SKB selected Oesthammar municipality in the middle of 2009. To follow and scrutinise both site investigations as well as the applications, the organisation within the municipality has changed over time. As the site selection process got underway, the municipality extended its organisation to three committees (EIA, long-term safety and consultation). The committees have respective objectives: reviewing the health and environmental impact, reviewing the long-term safety and communication about the work that is going on within and around the municipality. These are primarily political committees to which a unit of civil servants is attached. The main goal for the organisation is to build up knowledge skills and prepare both the existing as well as the future municipality council for the decision of whether or not the municipality of Oesthammar will accept a final repository for spent nuclear fuel in our municipality. The absolutely most important issue for the municipality is long term-safety and as the process has progressed the municipality has made several statements to the authorities. (authors)

  11. Preliminary safety analysis of unscrammed events for KLFR

    International Nuclear Information System (INIS)

    Kim, S.J.; Ha, G.S.

    2005-01-01

    The report presents the design features of KLFR; Safety Analysis Code; steady-state calculation results and analysis results of unscrammed events. The calculations of the steady-state and unscrammed events have been performed for the conceptual design of KLFR using SSC-K code. UTOP event results in no fuel damage and no centre-line melting. The inherent safety features are demonstrated through the analysis of ULOHS event. Although the analysis of ULOF has much uncertainties in the pump design, the analysis results show the inherent safety characteristics. 6% flow of rated flow of natural circulation is formed in the case of ULOF. In the metallic fuel rod, the cladding temperature is somewhat high due to the low heat transfer coefficient of lead. ULOHS event should be considered in design of RVACS for long-term cooling

  12. Compliant flooring to prevent fall-related injuries in older adults: A scoping review of biomechanical efficacy, clinical effectiveness, cost-effectiveness, and workplace safety.

    Science.gov (United States)

    Lachance, Chantelle C; Jurkowski, Michal P; Dymarz, Ania C; Robinovitch, Stephen N; Feldman, Fabio; Laing, Andrew C; Mackey, Dawn C

    2017-01-01

    Compliant flooring, broadly defined as flooring systems or floor coverings with some level of shock absorbency, may reduce the incidence and severity of fall-related injuries in older adults; however, a lack of synthesized evidence may be limiting widespread uptake. Informed by the Arksey and O'Malley framework and guided by a Research Advisory Panel of knowledge users, we conducted a scoping review to answer: what is presented about the biomechanical efficacy, clinical effectiveness, cost-effectiveness, and workplace safety associated with compliant flooring systems that aim to prevent fall-related injuries in healthcare settings? We searched academic and grey literature databases. Any record that discussed a compliant flooring system and at least one of biomechanical efficacy, clinical effectiveness, cost-effectiveness, or workplace safety was eligible for inclusion. Two independent reviewers screened and abstracted records, charted data, and summarized results. After screening 3611 titles and abstracts and 166 full-text articles, we included 84 records plus 56 companion (supplementary) reports. Biomechanical efficacy records (n = 50) demonstrate compliant flooring can reduce fall-related impact forces with minimal effects on standing and walking balance. Clinical effectiveness records (n = 20) suggest that compliant flooring may reduce injuries, but may increase risk for falls. Preliminary evidence suggests that compliant flooring may be a cost-effective strategy (n = 12), but may also result in increased physical demands for healthcare workers (n = 17). In summary, compliant flooring is a promising strategy for preventing fall-related injuries from a biomechanical perspective. Additional research is warranted to confirm whether compliant flooring (i) prevents fall-related injuries in real-world settings, (ii) is a cost-effective intervention strategy, and (iii) can be installed without negatively impacting workplace safety. Avenues for future research are

  13. LESSONS LEARNED IN DEVELOPMENT OF THE HANFORD SWOC MASTER DOCUMENTED SAFETY ANALYSIS (MDSA) and IMPLEMENTATION VALIDATION REVIEW (IVR)

    International Nuclear Information System (INIS)

    MORENO, M.R.

    2004-01-01

    DOE set clear expectations on a cost-effective approach for achieving compliance with the Nuclear Safety Management requirements (20 CFR 830, Nuclear Safety Rule), which ensured long-term benefit to Hanford, via issuance of a nuclear safety strategy in February 2003. To facilitate implementation of these expectations, tools were developed to streamline and standardize safety analysis and safety document development with the goal of a shorter and more predictable DOE approval cycle. A Hanford Safety Analysis and Risk Assessment Handbook (SARAH) was approved to standardize methodologies for development of safety analyses. A Microsoft Excel spreadsheet (RADIDOSE) was approved for the evaluation of radiological consequences for accident scenarios often postulated at Hanford. Standard safety management program chapters were approved for use as a means of compliance with the programmatic chapters of DOE-STD-3009, ''Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports''. An in-process review was developed between DOE and the Contractor to facilitate DOE approval and provide early course correction. The new Documented Safety Analysis (DSA) developed to address the operations of four facilities within the Solid Waste Operations Complex (SWOC) necessitated development of an Implementation Validation Review (IVR) process. The IVR process encompasses the following objectives: safety basis controls and requirements are adequately incorporated into appropriate facility documents and work instructions, facility personnel are knowledgeable of controls and requirements, and the DSA/TSR controls have been implemented. Based on DOE direction and safety analysis tools, four waste management nuclear facilities were integrated into one safety basis document. With successful completion of implementation of this safety document, lessons-learned from the in-process review, safety analysis tools and IVR process were documented for future action

  14. What is the value and impact of quality and safety teams? A scoping review

    Directory of Open Access Journals (Sweden)

    Norris Jill M

    2011-08-01

    Full Text Available Abstract Background The purpose of this study was to conduct a scoping review of the literature about the establishment and impact of quality and safety team initiatives in acute care. Methods Studies were identified through electronic searches of Medline, Embase, CINAHL, PsycINFO, ABI Inform, Cochrane databases. Grey literature and bibliographies were also searched. Qualitative or quantitative studies that occurred in acute care, describing how quality and safety teams were established or implemented, the impact of teams, or the barriers and/or facilitators of teams were included. Two reviewers independently extracted data on study design, sample, interventions, and outcomes. Quality assessment of full text articles was done independently by two reviewers. Studies were categorized according to dimensions of quality. Results Of 6,674 articles identified, 99 were included in the study. The heterogeneity of studies and results reported precluded quantitative data analyses. Findings revealed limited information about attributes of successful and unsuccessful team initiatives, barriers and facilitators to team initiatives, unique or combined contribution of selected interventions, or how to effectively establish these teams. Conclusions Not unlike systematic reviews of quality improvement collaboratives, this broad review revealed that while teams reported a number of positive results, there are many methodological issues. This study is unique in utilizing traditional quality assessment and more novel methods of quality assessment and reporting of results (SQUIRE to appraise studies. Rigorous design, evaluation, and reporting of quality and safety team initiatives are required.

  15. Preliminary Study on the Development of Quantitative Safety Culture Index

    International Nuclear Information System (INIS)

    Lee, Young Eal; Kim, Hun Sil; Ahn, Nam Sung

    2005-01-01

    Safety culture is that assembly of characteristics and attitudes in organizations and individuals which establishes that, as an overriding priority, nuclear plant safety issues receive the attention warranted by their significance. Because it needs to be recognized as the most significant consciousness to achieve the nuclear safety performance, Korean government and nuclear power generation company have tried to develop the practical method to improve the safety culture from the long term point view. In this study, based on the site interviews to define the potential issues on organizational behavior for the safe operation and the survey on the level of safety culture of occupied workers are conducted. Survey results are quantified as a few indicators of nuclear safety by the statistical method and it can be simulated by the dynamic modeling as time goes on. Currently index and dynamic modeling are still being developed, however, results can be used to suggest the long term strategy which safety is clearly integrated into all activities in the nuclear organization

  16. Nuclear Safety Review for the Year 2009

    International Nuclear Information System (INIS)

    2010-07-01

    . A growing number of Member States are considering or have expressed interest in developing nuclear power programmes for the first time. Several countries have also embarked on ambitious plans for expanding their current programmes. The Agency's latest projections for the future of nuclear power by 2030 are higher than they were last year. Emerging international cooperative efforts in support of new and expanding nuclear power programmes have focused on many key issues. Such issues include gaps in national safety infrastructures, safety and security synergy and integration, and safety responsibilities and capacities for the various participants in a nuclear power programme, which include operators, regulators, government, suppliers, technical support organizations and relevant international organizations. Continued focus on cooperation for new and expanding nuclear power programmes is underscored by the fact that in some cases plans for nuclear programme development are moving faster than the establishment of the necessary safety infrastructure and capacity. Therefore, it is important that those countries of new and expanding nuclear power programmes actively participate in the global nuclear safety and security regime. As a result of the increasingly multinational nature of today's nuclear business and activities and associated technical and economic benefits, suppliers, operators, regulators and experts communities are making significant efforts towards the standardization and harmonization of equipment, components, methods and processes. As an example, the adoption by the European Union of a nuclear towards a harmonized approach to sustainable nuclear safety infrastructure worldwide. Similarly, international cooperation through conventions and codes of conduct, including associated peer review mechanisms, also provide for harmonized approaches to safety. Establishing and maintaining a regulatory body which is effectively independent in its decision making

  17. Status of IAEA CRPI31018 “Development of Methodologies for the Assessment of Passive Safety System Performance in Advanced Reactors”

    International Nuclear Information System (INIS)

    Subki, Hadid M.

    2011-01-01

    Purpose of research coordination meeting: • To review progress and milestones on all research activities; • To discuss the preliminary experimental data obtained from the Natural Circulation Loop Facility L2 in Italy constructed for the assessment of different methodologies for the evaluation of the reliability of passive safety system; • To discuss lessons-to be-learned from the Fukushima Daiichi Accident in Japan and its implications to near future R&D needs on thermal-hydraulics and reactor safety; • To develop an outline of integrated annual technical report and future collaboration plan

  18. IAEA Review for Gap Analysis of Safety Analysis Capability

    International Nuclear Information System (INIS)

    Basic, Ivica; Kim, Manwoong; Huges, Peter; Lim, B-K; D'Auria, Francesco; Louis, Vidard Michael

    2014-01-01

    improvement of nuclear safety in the participating host organization and host member countries. To achieve this goal, the EM is to establish a process of discussion and comparison of gap findings, which will lead to sharing of information, experience, strengths and weaknesses among the participants, and foster regional cooperation to improve the weaknesses and improve safety generally. The pilot mission was conducted from 28 October to 1 November for one week at the National Nuclear Agency (BATAN) in Indonesia by the mission team formulated with 6 international experts who have considerable knowledge and experience in the field of safety analysis such as the deterministic safety analysis (DSA) and probabilistic safety analysis (PSA). Some comments and recommendations were given to BATAN management to support the establishment and maintenance of safety analysis capability and human resource, organizational and training aspects. Those aspects are important as a measure of the progress being made and an indicator of areas in SATG within the framework of the Extra-budgetary Programme on the Safety of Nuclear Installations in Southeast Asia, the Pacific, and Far East Countries (the EBP-Asia) or other cooperation programme, such as the IAEA Technical Cooperation programme. Provided in 2013 the Review of Gap Analysis for BATAN (Indonesian Nuclear Safety Regulatory Body) could be good reference for all other newcomer countries which started or plans nuclear power plant installation. (authors)

  19. Report of the evaluation by the Ad Hoc Review Committee on Nuclear Safety Research. Result evaluation in fiscal year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Nuclear Safety Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the R and D accomplishments achieved for five years from Fiscal Year 1995 to Fiscal Year 1999 at Department of Reactor Safety Research, Department of Fuel Cycle Safety Research, Department of Environmental Safety Research and Department of Safety Research Technical Support in Tokai Research Establishment at JAERI. The Ad Hoc Review Committee consisted of 11 specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from December 2000 to February 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on December 11, 2000, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Nuclear Safety Research. (author)

  20. National nuclear safety report 2004. Convention on nuclear safety

    International Nuclear Information System (INIS)

    2004-01-01

    The second National Nuclear Safety Report was presented at the second review meeting of the Nuclear Safety Convention. At that time it was concluded that Argentina met the obligations of the Convention. This third National Nuclear Safety Report is an updated report which includes all safety aspects of the Argentinian nuclear power plants and the measures taken to enhance the safety of the plants. The present report also takes into account the observations and discussions maintained during the second review meeting. The conclusion made in the first review meeting about the compliance by Argentina of the obligations of the Convention are included as Annex I and those belonging to the second review meeting are included as Annex II. In general, the information contained in this Report has been updated since March 31, 2001 to April 30, 2004. Those aspects that remain unchanged were not addressed in this third report. As a result of the detailed analysis of all the Articles, it can be stated that the country fulfils all the obligations imposed by the Nuclear Safety Convention. The questions and answers originated at the Second Review Meeting are included as Annex III