  1. Preliminary Development of Regulatory PSA Models for SFR

    International Nuclear Information System (INIS)

    Choi, Yong Won; Shin, Andong; Bae, Moohoon; Suh, Namduk; Lee, Yong Suk

    2013-01-01

    Well developed PRA methodology exists for LWR (Light Water Reactor) and PHWR (Pressurized Heavy Water Reactor). Since KAERI is developing a prototype SFR targeting to apply for a license by 2017, KINS needs to have a PRA models to assess the safety of this prototype reactor. The purpose of this study is to develop the regulatory PSA models for the independent verification of the SFR safety. Since the design of the prototype SFR is not mature yet, we have tried to develop the preliminary models based on the design data of KAERI's previous SFR design. In this study, the preliminary initiating events of level 1 internal event for SFR were selected through reviews of existing PRA (LWR, PRISM, ASTRID and KALIMER-600) models. Then, the event tree for each selected initiating event was developed. The regulatory PRA models of SFR developed are preliminary in a sense, because the prototype SFR design is not mature and provided yet. Still it might be utilized for the forthcoming licensing review in assessing the risk of safety issues and the configuration control of the design

  2. Review of SFR Design Safety using Preliminary Regulatory PSA Model

    International Nuclear Information System (INIS)

    Na, Hyun Ju; Lee, Yong Suk; Shin, Andong; Suh, Nam Duk

    2013-01-01

    The major objective of this research is to develop a risk model for regulatory verification of the SFR design, and thereby, make sure that the SFR design is adequate from a risk perspective. In this paper, the development result of preliminary regulatory PSA model of SFR is discussed. In this paper, development and quantification result of preliminary regulatory PSA model of SFR is discussed. It was confirmed that the importance PDRC and ADRC dampers is significant as stated in the result of KAERI PSA model. However, the importance can be changed significantly depending on assumption of CCCG and CCF factor of PDRC and ADRC dampers. SFR (sodium-cooled fast reactor) which is Gen-IV nuclear energy system, is designed to accord with the concept of stability, sustainability and proliferation resistance. KALIMER-600, which is under development in Korea, includes passive safety systems (e. g. passive reactor shutdown, passive residual heat removal, and etc.) as well as active safety systems. Risk analysis from a regulatory perspective is needed to support the regulatory body in its safety and licensing review for SFR (KALIMER-600). Safety issues should be identified in the early design phase in order to prevent the unexpected cost increase and delay of the SFR licensing schedule that may be caused otherwise

  3. 78 FR 61987 - Corbett Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-10-09

    ... District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting... construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Corbett Hydroelectric...

  4. 78 FR 63176 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting...

    Science.gov (United States)

    2013-10-23

    ... Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To... of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The...

  5. 45 CFR 150.217 - Preliminary determination.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Preliminary determination. 150.217 Section 150.217... Are Failing To Substantially Enforce HIPAA Requirements § 150.217 Preliminary determination. If, at... designees). (b) Notifies the State of CMS's preliminary determination that the State has failed to...

  6. 78 FR 53752 - City of Sandpoint, Idaho; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-08-30

    ... Sandpoint, Idaho; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and... intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Little...

  7. 78 FR 61985 - City of Astoria, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-10-09

    ..., Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting... of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The...

  8. Preliminary regulatory assessment of nuclear power plants vulnerabilities

    International Nuclear Information System (INIS)

    Kostadinov, V.; Petelin, S.

    2004-01-01

    Preliminary attempts to develop models for nuclear regulatory vulnerability assessment of nuclear power plants are presented. Development of the philosophy and computer tools could be new and important insight for management of nuclear operators and nuclear regulatory bodies who face difficult questions about how to assess the vulnerability of nuclear power plants and other nuclear facilities to external and internal threats. In the situation where different and hidden threat sources are dispersed throughout the world, the assessment of security and safe operation of nuclear power plants is very important. Capability to evaluate plant vulnerability to different kinds of threats, like human and natural occurrences and terrorist attacks and preparation of emergency response plans and estimation of costs are of vital importance for assurance of national security. On the basis of such vital insights, nuclear operators and nuclear regulatory bodies could plan and optimise changes in oversight procedures, organisations, equipment, hardware and software to reduce risks taking into account security and safety of nuclear power plants operation, budget, manpower, and other limitations. Initial qualitative estimations of adapted assessments for nuclear applications are shortly presented. (author)

  9. 78 FR 56872 - City of Barre, Vermont; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-09-16

    ..., Vermont; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting... construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Nelson Street 17 kW...

  10. 45 CFR 671.15 - Publication of preliminary determination

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Publication of preliminary determination 671.15... Publication of preliminary determination Prior to any designation or redesignation of substances pursuant to... Environmental Protection Agency and other federal agencies, within 30 days after the date of publication of...

  11. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    International Nuclear Information System (INIS)

    Lee, Yong Suk; Jung, Dae Wook; Cho, Nam Chul

    2008-01-01

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future

  12. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Suk; Jung, Dae Wook [Future and Challenges Inc., Seoul (Korea, Republic of); Cho, Nam Chul [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2008-10-15

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future.

  13. 76 FR 7762 - Drinking Water: Regulatory Determination on Perchlorate

    Science.gov (United States)

    2011-02-11

    ...-9262-8] RIN 2040-AF08 Drinking Water: Regulatory Determination on Perchlorate AGENCY: Environmental...'s) regulatory determination for perchlorate in accordance with the Safe Drinking Water Act (SDWA... substantial likelihood that perchlorate will occur in public water systems with a frequency and at levels of...

  14. 17 CFR 201.420 - Appeal of determinations by self-regulatory organizations.

    Science.gov (United States)

    2010-04-01

    ... self-regulatory organizations. 201.420 Section 201.420 Commodity and Securities Exchanges SECURITIES... Review § 201.420 Appeal of determinations by self-regulatory organizations. (a) Application for review... by a self-regulatory organization determination as to which a notice is required to be filed with the...

  15. 17 CFR 201.421 - Commission consideration of determinations by self-regulatory organizations.

    Science.gov (United States)

    2010-04-01

    ... determinations by self-regulatory organizations. 201.421 Section 201.421 Commodity and Securities Exchanges... Commission Review § 201.421 Commission consideration of determinations by self-regulatory organizations. (a..., order review of any determination by a self-regulatory organization that could be subject to an...

  16. Preliminary regulatory audit calculation for Shinkori Units 3 and 4 LBLOCA

    Energy Technology Data Exchange (ETDEWEB)

    Woo, S. W.; Kim, B. S.; Kim, J. K. (and others)

    2006-12-15

    The objective of this study is to perform a preliminary evaluation for Shinkori Units 3 and 4 LBLOCA by applying KINS Realistic Evaluation Methodology (REM). The following results were obtained: (1) From the evaluation for Shinkori Units 3 and 4 LBLOCA, the peak cladding temperature was evaluated to meet the regulatory requirement and the feasibility of the KINS-REM was identified. (2) The input decks that were developed in the previous studies, were reviewed and the evaluation model of the fluidic device was developed and applied for the audit calculation. (3) The treating method for the uncertainty of the gap conductance was developed and applied for the audit calculation. (4) The pre- and post-processing programs were developed for this study. (5) For the more detailed assessments, the information for the gap conductance, etc. should be improved and the effects of coolant bypass during blowdown, steam binding and so on were not sufficiently evaluated. KINS-REM should be advanced to evaluate these effects properly. The KINS methodology that was used in this study, can be further applied for independent regulatory audit calculations related to the licensing application on LOCA best estimate calculation.

  17. Preliminary Determination of Activation Products for a Varian Truebeam Linear Accelerator.

    Science.gov (United States)

    Waller, Edward; Ram, Rohan; Steadman, Ian

    2017-09-01

    Medical linear accelerators used to treat various forms of cancers are operated at a number of different energies. A by-product of the high-energy photons produced by accelerators is activation of components within the machine itself and its surrounding bunker. The activation products pose radiological and regulatory challenges during the operation of the accelerator as well as when it is time for final decommissioning. The Varian TrueBeam is a new state-of-the-art linear accelerator now operating in the Canadian market. There is currently limited information on the production of its activation products and the resulting impacts on operation and decommissioning. In this paper, activation products in the Varian TrueBeam accelerator are experimentally determined by performing gamma spectroscopy using a portable high purity germanium detector. A total of 10 isotopes are identified for the conditions tested, which include Na, Al, Mn, Ni, Cu, Cu, Br, Sb, Sb, W. The half-lives of these isotopes range from 2.3 min to 60.2 d. These preliminary results indicate that a decommissioning case similar to other radiotherapy accelerators can be made.

  18. Preliminary Study on the Establishment of Regulatory Infrastructure for a Commercial SMART Licensing

    International Nuclear Information System (INIS)

    Yune, Young Gill; Roh, Kyung Wan; Kang, Dong Gu; Kim, Hho Jung; Jo, Jong Chull

    2007-01-01

    The SMART, an integral type of PWR with the capacity of 330MWth, has been developed for multi-purposes such as seawater desalination, ship propulsion, and district heating in Korea since early 1990s. The basic design of the SMART had been completed in 2002. For the demonstration of the safety and performance of the SMART, a project to construct a 1/5 scaled-down prototype reactor with capacity of 65MWth, called as SMART-P(SMART Pilot Plant), has been performed from 2002 to 2006. However, in 2006, the project to construct the SMART-P was replaced with a preliminary project to develop a commercial SMART in order to advance commercialization of the SMART. Since the SMART is the first commercial reactor adopting the integral design concept and new system/components such as passive residual heat removal system, canned motor pump, and helical tube steam generator in Korea, some verification tests need to be performed to demonstrate the safety and performance of the SMART. Also, since several new design computer codes that have not yet been confirmed by the regulatory body are expected to be used in the design, some validation tests should be performed to demonstrate their applicability for important accident phenomena. In order to carry out the SMART development project satisfactorily and to prevent any undesirable delay of licensing process, it is necessary to establish a well-planned verification test program in advance through the early identification of the scope and items of the verification tests. Also, the issues for which either policy decision-makings or detailed technical evaluations are needed should be identified in an early stage of design, and the regulatory positions for the issues should be provided either timely or in advance. Advance identification of regulatory requirements/guides to be amended or newly developed enables to provide regulatory directions for such items in the early stage of design. The objective of this paper is to introduce the current

  19. Preliminary Study on the Establishment of Regulatory Infrastructure for a Commercial SMART Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Yune, Young Gill; Roh, Kyung Wan; Kang, Dong Gu; Kim, Hho Jung; Jo, Jong Chull [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2007-10-15

    The SMART, an integral type of PWR with the capacity of 330MWth, has been developed for multi-purposes such as seawater desalination, ship propulsion, and district heating in Korea since early 1990s. The basic design of the SMART had been completed in 2002. For the demonstration of the safety and performance of the SMART, a project to construct a 1/5 scaled-down prototype reactor with capacity of 65MWth, called as SMART-P(SMART Pilot Plant), has been performed from 2002 to 2006. However, in 2006, the project to construct the SMART-P was replaced with a preliminary project to develop a commercial SMART in order to advance commercialization of the SMART. Since the SMART is the first commercial reactor adopting the integral design concept and new system/components such as passive residual heat removal system, canned motor pump, and helical tube steam generator in Korea, some verification tests need to be performed to demonstrate the safety and performance of the SMART. Also, since several new design computer codes that have not yet been confirmed by the regulatory body are expected to be used in the design, some validation tests should be performed to demonstrate their applicability for important accident phenomena. In order to carry out the SMART development project satisfactorily and to prevent any undesirable delay of licensing process, it is necessary to establish a well-planned verification test program in advance through the early identification of the scope and items of the verification tests. Also, the issues for which either policy decision-makings or detailed technical evaluations are needed should be identified in an early stage of design, and the regulatory positions for the issues should be provided either timely or in advance. Advance identification of regulatory requirements/guides to be amended or newly developed enables to provide regulatory directions for such items in the early stage of design. The objective of this paper is to introduce the current

  20. Implications of the timing of the preliminary determination of suitability

    International Nuclear Information System (INIS)

    Cotton, T.A.

    1986-01-01

    The Nuclear Waste Policy Act of 1982 requires that the Enviromental Impact Statement prepared for the recommendation of a repository site must consider three sites -- the one selected for the repository and at least two alternatives. All of these sites must have been characterized, and the Secretary of Energy must have made a preliminary determination that each is suitable for development as a repository. There is great disagreement about whether that ''preliminary determination of suitability'' is to be made before or after site characterization. If the Act is interpreted as requiring the determination to be made after characterization is completed, DOE cannot recommend the first site for licensing until it has three sites that appear suitable after full characterization; if the determination can be made before characterization, DOE can proceed to licensing even if only one site survives characterization. While DOE plans to make the preliminary determination before starting characterization, the uncertainty about how a court might ultimately interpret the Act injects a significant institutional uncertainty into the schedule for the repository, and complicates contingency planning for the siting process. Early resolution of the interpretation would greatly aid DOE's planning for the siting program

  1. Creating a safety culture in the regulatory authority: The Cuban experience

    International Nuclear Information System (INIS)

    Ferro Fernandez, R.; Guillen Campos, A.

    2002-01-01

    The Cuban regulatory authority has been working during several years for the fostering and development of a high Safety Culture level in nuclear activities in the country. As starting point to achieve this objective the assessment of the Safety Culture level in the regulatory authority performance was considered an important issue. For this purpose a preliminary diagnosis was carried out by means of a national survey that allowed identifying some areas of the regulatory activity that required improvements in order to achieve a higher Safety Culture and to immediately implement appropriate actions. Two of the most important actions undertaken were: the statement of the regulatory authority Safety Policy which governs and determines the performance of this organization and its staff and also the implementation of a new interaction practice at top level between the regulatory authority and the utilities of the nuclear sector through the Annual Regulatory Conference. The present paper summarizes these two introduced practices into the Cuban regulatory activity. (author)

  2. 77 FR 26018 - Determination of Regulatory Review Period for Purposes of Patent Extension; Victoza

    Science.gov (United States)

    2012-05-02

    ... exercise to improve glycemic control in adults with type 2 diabetes mellitus. Subsequent to this approval...] Determination of Regulatory Review Period for Purposes of Patent Extension; Victoza AGENCY: Food and Drug... regulatory review period for Victoza and is publishing this notice of that determination as required by law...

  3. 78 FR 56217 - Steel Threaded Rod from India: Postponement of Preliminary Determination of Countervailing Duty...

    Science.gov (United States)

    2013-09-12

    ... rental space, freight charges, airfare and advertising. The deadline for completion of the preliminary..., the preliminary determination is due the next business day, i.e., November 25, 2013. See Notice of Clarification: Application of ``Next Business Day'' Rule for Administrative Determination Deadlines Pursuant to...

  4. Development of an international BRC [Below Regulatory Concern] limit

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.

    1987-07-01

    The International Atomic Energy Agency (IAEA) has recently investigated the exemption from regulatory control of radiation sources containing limited quantities of radioactive materials. Early efforts were entitled de minimis and were aimed at establishing a philosophical basis and radiation dose limits. The main objectives of more recent work on exemption are to illustrate a method for developing practical radiological criteria, to establish generic criteria, and to determine the practicability of the preliminary exemption principles. The method used to develop the criteria relies on models to evaluate the potential radiation exposure pathways and scenarios for individuals and population groups potentially present following the unrestricted release of materials. This paper describes the assessment methods, presents the generic results expressed in terms of the limiting concentrations of selected radionuclides in municipal waste, and provides a comparison with recent regulatory efforts in the United States for considering selected wastes being Below Regulatory Concern (BRC). 17 refs., 4 tabs

  5. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in the United States. Preliminary background report

    Energy Technology Data Exchange (ETDEWEB)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is one of a series of preliminary reports describing the laws and regulatory programs of the United States and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. This report describes laws and regulatory programs in the United States. Subsequent reports will (1) describe public utility rate regulatory procedures and practices as they might affect an ICES, (2) analyze each of the aforementioned regulatory programs to identify impediments to the development of ICES, and (3) recommend potential changes in legislation and regulatory practices and procedures to overcome such impediments.

  6. 75 FR 47307 - Center for Devices and Radiological Health 510(k) Working Group Preliminary Report and...

    Science.gov (United States)

    2010-08-05

    ..., and Task Force on the Utilization of Science in Regulatory Decision Making Preliminary Report and...: The 510(k) Working Group and the Task Force on the Utilization of Science in Regulatory Decision Making. Volume I is entitled ``510(k) Working Group Preliminary Report and Recommendations.'' Volume II...

  7. Sexy splicing: regulatory interplays governing sex determination from Drosophila to mammals.

    Science.gov (United States)

    Lalli, Enzo; Ohe, Kenji; Latorre, Elisa; Bianchi, Marco E; Sassone-Corsi, Paolo

    2003-02-01

    A remarkable array of strategies is used to produce sexual differentiation in different species. Complex gene hierarchies govern sex determination pathways, as exemplified by the classic D. melanogaster paradigm, where an interplay of transcriptional, splicing and translational mechanisms operate. Molecular studies support the hypothesis that genetic sex determination pathways evolved in reverse order, from downstream to upstream genes, in the cascade. The recent identification of a role for the key regulatory factors SRY and WT1(+KTS) in pre-mRNA splicing indicates that important steps in the mammalian sex determination process are likely to operate at the post-transcriptional level.

  8. Preliminary Consideration for the Development of Regulatory Level 2 PSA Model

    International Nuclear Information System (INIS)

    Lee, Chang-Ju

    2006-01-01

    In order to assess the validity of PSA (probabilistic safety assessment) results and to establish regulatory requirements for relevant safety issues most of the regulators want to develop an independent and convenient risk assessment model including Level 2 PSA area. As this model and framework should be implicitly independent on the licensee's PSA model, it has a primary objective directly for applying to the risk-informed regulatory affairs and for supporting those kinds of works. According this, the regulator can take an objective view for the uncertainty of risk information made by the licensee and keep up the capability and decision-making framework for overall risk assessment results. In addition, the regulatory model may be used to verify and validate the operational risk levels of all engineered safety features of nuclear power plants (NPPs). An issue for plant-specific application of safety goals was previously identified in the US NRC's risk-informed regulatory guidance development activities, and discussed in many Commission papers, e. g. SECY-97-287, which identifies the goal for large early release frequency (LERF). LERF defines a containment performance criteria derived from the quantitative health objectives. As we know, the LERF was chosen to assess risk significance in Regulatory Guide 1.174 (2002) again, which provides one measure of the performance of the containment barrier, and represents a surrogate for early health effects

  9. Ship design methodologies of preliminary design

    CERN Document Server

    Papanikolaou, Apostolos

    2014-01-01

    This book deals with ship design and in particular with methodologies of the preliminary design of ships. The book is complemented by a basic bibliography and five appendices with useful updated charts for the selection of the main dimensions and other basic characteristics of different types of ships (Appendix A), the determination of hull form  from the data of systematic hull form series (Appendix B), the detailed description of the relational method for the preliminary estimation of ship weights (Appendix C), a brief review of the historical evolution of shipbuilding science and technology from the prehistoric era to date (Appendix D) and finally a historical review of regulatory developments of ship's damage stability to date (Appendix E).  The book can be used as textbook for ship design courses or as additional reading for university or college students of naval architecture courses and related disciplines; it may also serve as a reference book for naval architects, practicing engineers of rel...

  10. ANSI/ASHRAE/IESNA Standard 90.1-2007 Preliminary Qualitative Determination

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, Mark A.; Liu, Bing; Richman, Eric E.; Winiarski, David W.

    2010-05-25

    A preliminary qualitative analysis of all addenda to ANSI/ASHRAE/IESNA Standard 90.1-2004 that were included in ANSI/ASHRAE/IESNA Standard 90.1-2007 was conducted. All 44 addenda processed by ASHRAE in the creation of Standard 90.1-2007 from Standard 90.1-2004 were evaluated by DOE for their impact on energy efficiency. DOE preliminarily determined whether that addenda would have a positive, neutral, or negative impact on overall building efficiency.

  11. Preliminary site requirements and considerations for a monitored retrievable storage facility

    International Nuclear Information System (INIS)

    1991-08-01

    This report presents preliminary requirements and considerations for siting monitored retrievable storage (MRS) facility. It purpose is to provide guidance for assessing the technical suitability of potential sites for the facility. It has been reviewed by the NRC staff, which stated that this document is suitable for ''guidance in making preliminary determinations concerning MRS site suitability.'' The MRS facility will be licensed by the US Nuclear Regulatory Commission. It will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be developed by the DOE

  12. Regulatory Oversight of Safety Culture — Korea’s Experience

    International Nuclear Information System (INIS)

    Jung, S.J.; Choi, Y.S.; Kim, J.T.

    2016-01-01

    In Korea, a regulatory oversight program of safety culture was launched in 2012 to establish regulatory measures against several events caused by weak safety culture in the nuclear industry. This paper is intended to introduce the preliminary regulatory oversight framework, development and validation of safety culture components, pilot safety culture inspection results and lessons learned. The safety culture model should be based on a sound understanding of the national culture and industry characteristics where the model will be applied. The nuclear safety culture oversight model is being developed and built on the Korean regulatory system to independently assess the nuclear power operating organizations’ safety culture.

  13. Repository Subsurface Preliminary Fire Hazard Analysis

    International Nuclear Information System (INIS)

    Logan, Richard C.

    2001-01-01

    This fire hazard analysis identifies preliminary design and operations features, fire, and explosion hazards, and provides a reasonable basis to establish the design requirements of fire protection systems during development and emplacement phases of the subsurface repository. This document follows the Technical Work Plan (TWP) (CRWMS M and O 2001c) which was prepared in accordance with AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities''; Attachment 4 of AP-ESH-008, ''Hazards Analysis System''; and AP-3.11Q, ''Technical Reports''. The objective of this report is to establish the requirements that provide for facility nuclear safety and a proper level of personnel safety and property protection from the effects of fire and the adverse effects of fire-extinguishing agents

  14. 77 FR 74845 - AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit

    Science.gov (United States)

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115-001] AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit Take notice that AJT Mining Properties, Inc., permittee for the proposed Yeldagalga Creek Hydroelectric Project, has requested that its preliminary permit...

  15. Motivational and Affective Determinants of Self-Regulatory Strategy Use in Elementary School Mathematics

    Science.gov (United States)

    Chatzistamatiou, Mariza; Dermitzaki, Irini; Efklides, Anastasia; Leondari, Angeliki

    2015-01-01

    The aim of the study was to investigate the relationships between elementary students' reported use of self-regulatory strategies in mathematics and their motivational and affective determinants. Participants of the study were 344 fifth- and sixth-grade Greek students. Students were asked to complete self-reported measures regarding the strategies…

  16. Searching for Logistics and Regulatory Determinants Affecting Overseas Direct Purchase: An Empirical Cross-National Study

    Directory of Open Access Journals (Sweden)

    Hyuksoo Cho

    2017-03-01

    Full Text Available Cross-border e-commerce has been very successful in the last decade. Merchants and consumers have been encouraged to participate in e-commerce, including B2C or B2B. B2C is not limited to a domestic market anymore. Consumers across countries are interested in overseas direct purchases. They are willing to purchase products from major online shopping sites such as Amazon and eBay. We aim at gaining a better understanding of overseas direct purchases. Determinants of overseas direct purchases based on cross-national data are identified. Accordingly, we investigate logistics and regulatory determinants. Furthermore, external environments such as regulatory institutions and globalization are discussed in terms of overseas direct purchases. This study incorporates theoretical foundations into empirical findings. Specifically, the institutional theory and the resource-based view are applied to explain the internal and external determinants to increase overseas direct purchases. We conduct an empirical test using panel data for each country to identify the various determinants associated with overseas direct purchases.

  17. 78 FR 79670 - Steel Threaded Rod From Thailand: Preliminary Determination of Sales at Less Than Fair Value and...

    Science.gov (United States)

    2013-12-31

    ... Thailand: Preliminary Determination of Sales at Less Than Fair Value and Affirmative Preliminary..., sold in the United States at less than fair value (``LTFV''), as provided in section 733(b) of the... Less Than Fair Value: Sodium Nitrite from the Federal Republic of Germany, 73 FR 21909 (April 23, 2008...

  18. Reconstructing the regulatory circuit of cell fate determination in yeast mating response.

    Science.gov (United States)

    Shao, Bin; Yuan, Haiyu; Zhang, Rongfei; Wang, Xuan; Zhang, Shuwen; Ouyang, Qi; Hao, Nan; Luo, Chunxiong

    2017-07-01

    Massive technological advances enabled high-throughput measurements of proteomic changes in biological processes. However, retrieving biological insights from large-scale protein dynamics data remains a challenging task. Here we used the mating differentiation in yeast Saccharomyces cerevisiae as a model and developed integrated experimental and computational approaches to analyze the proteomic dynamics during the process of cell fate determination. When exposed to a high dose of mating pheromone, the yeast cell undergoes growth arrest and forms a shmoo-like morphology; however, at intermediate doses, chemotropic elongated growth is initialized. To understand the gene regulatory networks that control this differentiation switch, we employed a high-throughput microfluidic imaging system that allows real-time and simultaneous measurements of cell growth and protein expression. Using kinetic modeling of protein dynamics, we classified the stimulus-dependent changes in protein abundance into two sources: global changes due to physiological alterations and gene-specific changes. A quantitative framework was proposed to decouple gene-specific regulatory modes from the growth-dependent global modulation of protein abundance. Based on the temporal patterns of gene-specific regulation, we established the network architectures underlying distinct cell fates using a reverse engineering method and uncovered the dose-dependent rewiring of gene regulatory network during mating differentiation. Furthermore, our results suggested a potential crosstalk between the pheromone response pathway and the target of rapamycin (TOR)-regulated ribosomal biogenesis pathway, which might underlie a cell differentiation switch in yeast mating response. In summary, our modeling approach addresses the distinct impacts of the global and gene-specific regulation on the control of protein dynamics and provides new insights into the mechanisms of cell fate determination. We anticipate that our

  19. 76 FR 6459 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13954-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  20. 76 FR 7838 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  1. Regulatory controls for NORM contamination: Emerging issues and strategies

    International Nuclear Information System (INIS)

    Wennerberg, Linda

    1992-01-01

    Naturally occurring and accelerator-produced radioactive material (NORM) faces the increasing likelihood of federal or state regulatory control. Public concern and limited preliminary survey data fuel the debate over the necessity, approach, and jurisdiction of a NORM regulatory strategy. This debate requires the resolution of technical controversies and potentially competing state and federal agency interests. An additional facet of the debate is the impact of regulation upon traditionally non-nuclear industries, such as oil and gas production. Regulatory response has been initiated in several states, such as Louisiana's controls on equipment used in oil and gas production, to control specific industrial activities which generate NORM. A more comprehensive, generic federal strategy to control NORM contamination is also under review by the Environmental Protection Agency. This paper will detail the emerging technical issues, federal and state regulatory strategies under consideration, and evaluate the efficacy of selected regulatory approaches. (author)

  2. 75 FR 55552 - Polyvinyl Alcohol From Taiwan: Preliminary Determination of Sales at Less Than Fair Value and...

    Science.gov (United States)

    2010-09-13

    ... Taiwan: Preliminary Determination of Sales at Less Than Fair Value and Postponement of Final... Determination of Sales at Not Less Than Fair Value, 73 FR 33985 (June 16, 2008), and Certain Steel Nails from the People's Republic of China: Final Determination of Sales at Less Than Fair Value and Partial...

  3. Precise Hypocenter Determination around Palu Koro Fault: a Preliminary Results

    Science.gov (United States)

    Fawzy Ismullah, M. Muhammad; Nugraha, Andri Dian; Ramdhan, Mohamad; Wandono

    2017-04-01

    Sulawesi area is located in complex tectonic pattern. High seismicity activity in the middle of Sulawesi is related to Palu Koro fault (PKF). In this study, we determined precise hypocenter around PKF by applying double-difference method. We attempt to investigate of the seismicity rate, geometry of the fault and distribution of focus depth around PKF. We first re-pick P-and S-wave arrival time of the PKF events to determine the initial hypocenter location using Hypoellipse method through updated 1-D seismic velocity. Later on, we relocated the earthquake event using double-difference method. Our preliminary results show the distribution of relocated events are located around PKF and have smaller residual time than the initial location. We will enhance the hypocenter location through updating of arrival time by applying waveform cross correlation method as input for double-difference relocation.

  4. 77 FR 26768 - Determination of Regulatory Review Period for Purposes of Patent Extension; PROLIA

    Science.gov (United States)

    2012-05-07

    ... postmenopausal women with osteoporosis at high risk for fracture. Subsequent to this approval, the Patent and..., FDA-2010-E-0660, and FDA-2010-E-0659] Determination of Regulatory Review Period for Purposes of Patent... the Director of Patents and Trademarks, Department of Commerce, for the extension of a patent which...

  5. Enabling legislation and regulatory determinations for a nuclear power programme

    International Nuclear Information System (INIS)

    Ha Vinh Phuong

    1977-01-01

    General remarks on objectives and scope of enabling legislation, on the regulatory body and on the IAEA activities and assistance in regulatory matters e.g. the IAEA Safety Guides which are in preparation. (HP) [de

  6. Enabling legislation and regulatory determinations for a nuclear power programme

    International Nuclear Information System (INIS)

    Ha-Vinh, Phuong

    1975-01-01

    Broad definition of the scope of enabling legislation, identification of branches of laws involved in the licensing and regulatory control, overview of some typical licensing practices and provisions, some specific legislative or regulatory requirements including financial security to over nuclear liability. (HP) [de

  7. 77 FR 21532 - Glycine From the People's Republic of China: Preliminary Partial Affirmative Determination of...

    Science.gov (United States)

    2012-04-10

    ... Republic of China: Preliminary Partial Affirmative Determination of Circumvention of the Antidumping Duty..., requested that the Department initiate an anti-circumvention inquiry, pursuant to section 781(b) of the Act... merchandise as Indian origin. Id. \\3\\ See Domestic Interested Parties' request for an anti- circumvention...

  8. 78 FR 73838 - Steel Concrete Reinforcing Bar From Turkey: Postponement of Preliminary Determination in the...

    Science.gov (United States)

    2013-12-09

    ... DEPARTMENT OF COMMERCE International Trade Administration [C-489-819] Steel Concrete Reinforcing... countervailing duty investigation on steel concrete reinforcing bar from Turkey.\\1\\ The original signature date... signature date for the preliminary determination was revised to December 16, 2013.\\3\\ \\1\\ See Steel Concrete...

  9. Sewage Solids Irradiator Transportation System (SSITS) cask: preliminary design description

    International Nuclear Information System (INIS)

    Eakes, R.G.; Kempka, S.N.; Lamoreaux, G.H.; Sutherland, S.H.

    1983-02-01

    The preliminary design of the Sewage Solids Irradiator Transportation System (SSITS) Cask is presented in this document. The SSITS cask is to be used for the transport of radioactive cesium chloride and strontium fluoride capsules which are of use in irradiators or as heat sources. The SSITS cask is approximately 1.4 m in diameter, 1.3 m high, weighs roughly 9 t, provides 33 cm of steel shielding, and can dissipate up to 5.2 kW of decay heat. The cask design criteria are identified and a description of the cask design and operation is provided. Detailed analyses of the design were performed to demonstrate licensability of the cask by the Nuclear Regulatory Commission (NRC). Results of the analyses indicate that the preliminary design is in compliance with the pertinent regulatory requirements for licensing of a radioactive material transportation container

  10. 75 FR 34749 - Determination of Regulatory Review Period for Purposes of Patent Extension; BYSTOLIC; U.S. Patent...

    Science.gov (United States)

    2010-06-18

    ... and FDA-2008-E-0267] Determination of Regulatory Review Period for Purposes of Patent Extension; BYSTOLIC; U.S. Patent Nos. 5,759,580 and 6,545,040 AGENCY: Food and Drug Administration, HHS. ACTION... determination because of the submission of applications to the Director of Patents and Trademarks, Department of...

  11. Preliminary safety analysis methodology for the SMART

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Kyoo Hwan; Chung, Y. J.; Kim, H. C.; Sim, S. K.; Lee, W. J.; Chung, B. D.; Song, J. H. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-03-01

    This technical report was prepared for a preliminary safety analysis methodology of the 330MWt SMART (System-integrated Modular Advanced ReacTor) which has been developed by Korea Atomic Energy Research Institute (KAERI) and funded by the Ministry of Science and Technology (MOST) since July 1996. This preliminary safety analysis methodology has been used to identify an envelope for the safety of the SMART conceptual design. As the SMART design evolves, further validated final safety analysis methodology will be developed. Current licensing safety analysis methodology of the Westinghouse and KSNPP PWRs operating and under development in Korea as well as the Russian licensing safety analysis methodology for the integral reactors have been reviewed and compared to develop the preliminary SMART safety analysis methodology. SMART design characteristics and safety systems have been reviewed against licensing practices of the PWRs operating or KNGR (Korean Next Generation Reactor) under construction in Korea. Detailed safety analysis methodology has been developed for the potential SMART limiting events of main steam line break, main feedwater pipe break, loss of reactor coolant flow, CEA withdrawal, primary to secondary pipe break and the small break loss of coolant accident. SMART preliminary safety analysis methodology will be further developed and validated in parallel with the safety analysis codes as the SMART design further evolves. Validated safety analysis methodology will be submitted to MOST as a Topical Report for a review of the SMART licensing safety analysis methodology. Thus, it is recommended for the nuclear regulatory authority to establish regulatory guides and criteria for the integral reactor. 22 refs., 18 figs., 16 tabs. (Author)

  12. 76 FR 68154 - Certain Stilbenic Optical Brightening Agents From Taiwan: Preliminary Determination of Sales at...

    Science.gov (United States)

    2011-11-03

    ... Retail Carrier Bags From Taiwan: Preliminary Determination of Sales at Less Than Fair Value and... did not appear to experience significant changes in the cost of manufacturing during the period of... by exporters or producers ``in connection with the sale, for consumption in the foreign country, of...

  13. Preliminary environmental analysis of a geopressured-geothermal test well in Brazoria County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    White, W.A.; McGraw, M.; Gustavson, T.C.; Meriwether, J.

    1977-11-16

    Preliminary environmental data, including current land use, substrate lithology, soils, natural hazards, water resources, biological assemblages, meteorological data, and regulatory considerations have been collected and analyzed for approximately 150 km/sup 2/ of land near Chocolate Bayou, Brazoria County, Texas, in which a geopressured-geothermal test well is to be drilled in the fall of 1977. The study was designed to establish an environmental data base and to determine, within spatial constraints set by subsurface reservoir conditions, environmentally suitable sites for the proposed well. Preliminary analyses of data revealed the eed for focusing on the following areas: potential for subsidence and fault activation, susceptibility of test well and support facilities to fresh- and salt-water flooding, possible effects of produced saline waters on biological assemblages and groundwaer resources, distribution of expansive soils, and effect of drilling and associated support activities on known archeological-cultural resources.

  14. Preliminary environmental site assessments in New York City

    International Nuclear Information System (INIS)

    Lundy, P.; Gasson, D.R.; Longendyke, S.T.

    1991-01-01

    Preliminary Environmental Site Assessments are often performed prior to real estate transactions or refinancing. These assessments are typically performed for real estate buyers, sellers and lending institutions. Undertaking a Preliminary Environmental Site Assessment in New York City can often be quite complex and time-consuming. This is due, in part, to the age and density of buildings in the city as well as the myriad of regulatory agencies with jurisdiction over environmental issues. This paper will discuss how environmental assessments are performed with a special emphasis on building in New York City. In includes hazardous wastes management for Radon, PCB's and asbestos

  15. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13214-002; 14274-000] Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 12 Hydro Partners (Lock 12), and FFP Project 107 LLC (FFP 107) filed preliminary permit...

  16. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13213-002; 14271-000] Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 14 Hydro Partners (Lock 14), and FFP Project 106 LLC (FFP 106) filed preliminary permit...

  17. 76 FR 30656 - Multilayered Wood Flooring From the People's Republic of China: Preliminary Determination of...

    Science.gov (United States)

    2011-05-26

    ... negative preliminary determination, a request for such a postponement must be made by Petitioners. See..., oil or oil-modified or water-based polyurethanes, ultra- violet light cured polyurethanes, wax, epoxy... consists of a top wear layer sheet not made of wood, a decorative paper layer, a core-layer of high-density...

  18. 77 FR 46055 - Steel Wire Garment Hangers From Taiwan: Preliminary Determination of Sales at Less Than Fair Value

    Science.gov (United States)

    2012-08-02

    ... From Taiwan: Preliminary Determination of Sales at Less Than Fair Value AGENCY: Import Administration..., or are likely to be, sold in the United States at less than fair value (``LTFV''), as provided in... Final Determination of Sales at Less Than Fair Value and Final Negative Critical Circumstances: Carbon...

  19. 76 FR 73589 - Galvanized Steel Wire From the People's Republic of China: Amended Preliminary Determination of...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-570-975] Galvanized Steel Wire From... galvanized steel wire from the People's Republic of China (``PRC'').\\1\\ We are amending our Preliminary... Fair Value and Postponement of Final Determination: Galvanized Steel Wire from the People's Republic of...

  20. 78 FR 37217 - Ted P. Sorenson; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14519-000] Ted P. Sorenson; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 1, 2013, Ted P. Sorenson filed an application for a preliminary permit, pursuant to section 4(f) of the...

  1. Notification: Implementation of Executive Order 13771, “Reducing Regulation and Controlling Regulatory Costs”

    Science.gov (United States)

    Project #OA&E-FY18-0177, April 10, 2018. The OIG plans to begin preliminary research on the Office of the Administrator's Office of Policy implementation of Executive Order 13771, Reducing Regulation and Controlling Regulatory Costs.

  2. ANSI/ASHRAE/IES Standard 90.1-2013 Preliminary Determination: Qualitative Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, Mark A.; Hart, Reid; Athalye, Rahul A.; Rosenberg, Michael I.; Richman, Eric E.; Winiarski, David W.

    2014-03-01

    Section 304(b) of the Energy Conservation and Production Act (ECPA), as amended, requires the Secretary of Energy to make a determination each time a revised version of ASHRAE Standard 90.1 is published with respect to whether the revised standard would improve energy efficiency in commercial buildings. When the U.S. Department of Energy (DOE) issues an affirmative determination on Standard 90.1, states are statutorily required to certify within two years that they have reviewed and updated the commercial provisions of their building energy code, with respect to energy efficiency, to meet or exceed the revised standard. This report provides a preliminary qualitative analysis of all addenda to ANSI/ASHRAE/IES Standard 90.1-2010 (referred to as Standard 90.1-2010 or 2010 edition) that were included in ANSI/ASHRAE/IES Standard 90.1-2013 (referred to as Standard 90.1-2013 or 2013 edition).

  3. 78 FR 66355 - Pleasant Grove City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-11-05

    ... City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and... Grove City, Utah (Pleasant Grove) filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower...

  4. A simulation study of mutations in the genetic regulatory hierarchy for butterfly eyespot focus determination.

    Science.gov (United States)

    Marcus, Jeffrey M; Evans, Travis M

    2008-09-01

    The color patterns on the wings of butterflies have been an important model system in evolutionary developmental biology. A recent computational model tested genetic regulatory hierarchies hypothesized to underlie the formation of butterfly eyespot foci [Evans, T.M., Marcus, J.M., 2006. A simulation study of the genetic regulatory hierarchy for butterfly eyespot focus determination. Evol. Dev. 8, 273-283]. The computational model demonstrated that one proposed hierarchy was incapable of reproducing the known patterns of gene expression associated with eyespot focus determination in wild-type butterflies, but that two slightly modified alternative hierarchies were capable of reproducing all of the known gene expressions patterns. Here we extend the computational models previously implemented in Delphi 2.0 to two mutants derived from the squinting bush brown butterfly (Bicyclus anynana). These two mutants, comet and Cyclops, have aberrantly shaped eyespot foci that are produced by different mechanisms. The comet mutation appears to produce a modified interaction between the wing margin and the eyespot focus that results in a series of comet-shaped eyespot foci. The Cyclops mutation causes the failure of wing vein formation between two adjacent wing-cells and the fusion of two adjacent eyespot foci to form a single large elongated focus in their place. The computational approach to modeling pattern formation in these mutants allows us to make predictions about patterns of gene expression, which are largely unstudied in butterfly mutants. It also suggests a critical experiment that will allow us to distinguish between two hypothesized genetic regulatory hierarchies that may underlie all butterfly eyespot foci.

  5. 77 FR 31843 - Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and...

    Science.gov (United States)

    2012-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13318-002] Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On April 3, 2012, Swan Lake North Hydro, LLC, filed an application for a successive preliminary permit...

  6. Final Regulatory Determination for Special Wastes From Mineral Processing (Mining Waste Exclusion) - Federal Register Notice, June 13, 1991

    Science.gov (United States)

    This action presents the Agency's final regulatory determination required by section 3001(b)(3)(C) of the Resource Conservation and Recovery Act (RCRA) for 20 special wastes from the processing of ores and minerals.

  7. Regulatory commitment management and the managing of licensing documents

    International Nuclear Information System (INIS)

    Roxey, T.E.

    1993-01-01

    The Regulatory Commitment Management (RCM) Project was designed to strengthen Baltimore Gas ampersand Electric's (BG ampersand E's) ability to identify, implement, and maintain regulatory commitments. The first part of this project involved the development of a clear commitment management process. The second part was the development of a tool that enhances the ability to retrieve information from documents, and the third part of the project dealt with the actual identification of historical commitments. This paper represents the first opportunity for BG ampersand E to discuss some of the success of the second part and the preliminary findings of the third part of the project

  8. Preliminary investigation on determination of radionuclide distribution in field tracing test site

    International Nuclear Information System (INIS)

    Tanaka, Tadao; Mukai, Masayuki; Takebe, Shinichi; Guo Zede; Li Shushen; Kamiyama, Hideo.

    1993-12-01

    Field tracing tests for radionuclide migration have been conducted by using 3 H, 60 Co, 85 Sr and 134 Cs, in the natural unsaturated loess zone at field test site of China Institute for Radiation Protection. It is necessary to obtain confidable distribution data of the radionuclides in the test site, in order to evaluate exactly the migration behavior of the radionuclides in situ. An available method to determine the distribution was proposed on the basis of preliminary discussing results on sampling method of soils from the test site and analytical method of radioactivity in the soils. (author)

  9. Crystallization and preliminary crystallographic characterization of the PAS domains of EAG and ELK potassium channels

    International Nuclear Information System (INIS)

    Adaixo, Ricardo; Morais-Cabral, João Henrique

    2010-01-01

    The N-terminal PAS domains from the eukaryotic EAG potassium channels are thought to have a regulatory function. Here the expression, purification, crystallization and preliminary crystallographic characterization of two of these domains are described. Per–Arnt–Sim (PAS) domains are ubiquitous in nature; they are ∼130-amino-acid protein domains that adopt a fairly conserved three-dimensional structure despite their low degree of sequence homology. These domains constitute the N-terminus or, less frequently, the C-terminus of a number of proteins, where they exert regulatory functions. PAS-containing proteins generally display two or more copies of this motif. In this work, the crystallization and preliminary analysis of the PAS domains of two eukaryotic potassium channels from the ether-à-go-go (EAG) family are reported

  10. 77 FR 32531 - Circular Welded Carbon-Quality Steel Pipe From the Sultanate of Oman: Preliminary Determination...

    Science.gov (United States)

    2012-06-01

    ...-Quality Steel Pipe From the Sultanate of Oman: Preliminary Determination of Sales at Less Than Fair Value... pipe) from the Sultanate of Oman (Oman) is being, or is likely to be, sold in the United States at less... from India, Oman, the United Arab Emirates (UAE), and the Socialist Republic of Vietnam (Vietnam) on...

  11. Preliminary rock mechanics laboratory: Investigation plan

    International Nuclear Information System (INIS)

    Oschman, K.P.; Hummeldorf, R.G.; Hume, H.R.; Karakouzian, M.; Vakili, J.E.

    1987-01-01

    This document presents the rationale for rock mechanics laboratory testing (including the supporting analysis and numerical modeling) planned for the site characterization of a nuclear waste repository in salt. This plan first identifies what information is required for regulatory and design purposes, and then presents the rationale for the testing that satisfies the required information needs. A preliminary estimate of the minimum sampling requirements for rock laboratory testing during site characterization is also presented. Periodic revision of this document is planned

  12. A Simulation Study of Mutations in the Genetic Regulatory Hierarchy for Butterfly Eyespot Focus Determination

    OpenAIRE

    Marcus, Jeffrey M.; Evans, Travis M.

    2008-01-01

    The color patterns on the wings of butterflies have been an important model system in evolutionary developmental biology. A recent computational model tested genetic regulatory hierarchies hypothesized to underlie the formation of butterfly eyespot foci (Evans and Marcus, 2006). The computational model demonstrated that one proposed hierarchy was incapable of reproducing the known patterns of gene expression associated with eyespot focus determination in wild-type butterflies, but that two sl...

  13. A preliminary three-dimensional geological framework model for Yucca Mountain

    International Nuclear Information System (INIS)

    Stirewalt, G.L.; Henderson, D.B.

    1995-01-01

    A preliminary three-dimensional geological framework model has been developed for the potential high-level radioactive waste disposal site at Yucca Mountain. The model is based on field data and was constructed using EarthVision (Version 2.0) software. It provides the basic geological framework in which variations in geological parameters and features in and adjacent to the repository block can be illustrated and analyzed. With further refinement and modification of the model through incorporation of additional data, it can be used by Nuclear Regulatory Commission (NRC) staff to determine whether representation of subsurface geological features in Department of Energy models is reasonable. Consequently, NRC staff will be able to use the model during pre-licensing and licensing phases to assess models for analyses of site suitability, design considerations, and repository performance

  14. Team structure and regulatory focus: the impact of regulatory fit on team dynamic.

    Science.gov (United States)

    Dimotakis, Nikolaos; Davison, Robert B; Hollenbeck, John R

    2012-03-01

    We report a within-teams experiment testing the effects of fit between team structure and regulatory task demands on task performance and satisfaction through average team member positive affect and helping behaviors. We used a completely crossed repeated-observations design in which 21 teams enacted 2 tasks with different regulatory focus characteristics (prevention and promotion) in 2 organizational structures (functional and divisional), resulting in 84 observations. Results suggested that salient regulatory demands inherent in the task interacted with structure to determine objective and subjective team-level outcomes, such that functional structures were best suited to (i.e., had best fit with) tasks with a prevention regulatory focus and divisional structures were best suited to tasks with a promotion regulatory focus. This contingency finding integrates regulatory focus and structural contingency theories, and extends them to the team level with implications for models of performance, satisfaction, and team dynamics.

  15. Towards a predictive theory for genetic regulatory networks

    Science.gov (United States)

    Tkacik, Gasper

    When cells respond to changes in the environment by regulating the expression levels of their genes, we often draw parallels between these biological processes and engineered information processing systems. One can go beyond this qualitative analogy, however, by analyzing information transmission in biochemical ``hardware'' using Shannon's information theory. Here, gene regulation is viewed as a transmission channel operating under restrictive constraints set by the resource costs and intracellular noise. We present a series of results demonstrating that a theory of information transmission in genetic regulatory circuits feasibly yields non-trivial, testable predictions. These predictions concern strategies by which individual gene regulatory elements, e.g., promoters or enhancers, read out their signals; as well as strategies by which small networks of genes, independently or in spatially coupled settings, respond to their inputs. These predictions can be quantitatively compared to the known regulatory networks and their function, and can elucidate how reproducible biological processes, such as embryonic development, can be orchestrated by networks built out of noisy components. Preliminary successes in the gap gene network of the fruit fly Drosophila indicate that a full ab initio theoretical prediction of a regulatory network is possible, a feat that has not yet been achieved for any real regulatory network. We end by describing open challenges on the path towards such a prediction.

  16. Foundational Tests of the Need-Support Model: A Framework for Bridging Regulatory Focus Theory and Self-Determination Theory.

    Science.gov (United States)

    Vaughn, Leigh Ann

    2017-03-01

    This article introduces the need-support model, which proposes that regulatory focus can affect subjective support for the needs proposed by self-determination theory (autonomy, competence, and relatedness), and support of these needs can affect subjective labeling of experiences as promotion-focused and prevention-focused. Three studies tested these hypotheses ( N = 2,114). Study 1 found that people recall more need support in promotion-focused experiences than in prevention-focused experiences, and need support in their day yesterday (with no particular regulatory focus) fell in between. Study 2 found that experiences of higher need support were more likely to be labeled as promotion-focused rather than prevention-focused, and that each need accounted for distinct variance in the labeling of experiences. Study 3 varied regulatory focus within a performance task and found that participants in the promotion condition engaged in need-support inflation, whereas participants in the prevention condition engaged in need-support deflation. Directions for future research are discussed.

  17. Assessment of regulatory effectiveness. Peer discussions on regulatory practices

    International Nuclear Information System (INIS)

    1999-09-01

    This report arises from the seventh series of peer discussions on regulatory practices entitled 'Assessment of Regulatory Effectiveness'. The term 'regulatory effectiveness' covers the quality of the work and level of performance of a regulatory body. In this sense, regulatory effectiveness applies to regulatory body activities aimed at preventing safety degradation and ensuring that an acceptable level of safety is being maintained by the regulated operating organizations. In addition, regulatory effectiveness encompasses the promotion of safety improvements, the timely and cost effective performance of regulatory functions in a manner which ensures the confidence of the operating organizations, the general public and the government, and striving for continuous improvements to performance. Senior regulators from 22 Member States participated in two peer group discussions during March and May 1999. The discussions were focused on the elements of an effective regulatory body, possible indicators of regulatory effectiveness and its assessment. This report presents the outcome of these meetings and recommendations of good practices identified by senior regulators, which do not necessarily reflect those of the governments of the nominating Member States, the organizations they belong to, or the International Atomic Energy Agency. In order to protect people and the environment from hazards associated with nuclear facilities, the main objective of a nuclear regulatory body is to ensure that a high level of safety in the nuclear activities under its jurisdiction is achieved, maintained and within the control of operating organizations. Even if it is possible to directly judge objective safety levels at nuclear facilities, such safety levels would not provide an exclusive indicator of regulatory effectiveness. The way the regulatory body ensures the safety of workers and the public and the way it discharges its responsibilities also determine its effectiveness. Hence the

  18. Use of allele-specific FAIRE to determine functional regulatory polymorphism using large-scale genotyping arrays.

    Directory of Open Access Journals (Sweden)

    Andrew J P Smith

    Full Text Available Following the widespread use of genome-wide association studies (GWAS, focus is turning towards identification of causal variants rather than simply genetic markers of diseases and traits. As a step towards a high-throughput method to identify genome-wide, non-coding, functional regulatory variants, we describe the technique of allele-specific FAIRE, utilising large-scale genotyping technology (FAIRE-gen to determine allelic effects on chromatin accessibility and regulatory potential. FAIRE-gen was explored using lymphoblastoid cells and the 50,000 SNP Illumina CVD BeadChip. The technique identified an allele-specific regulatory polymorphism within NR1H3 (coding for LXR-α, rs7120118, coinciding with a previously GWAS-identified SNP for HDL-C levels. This finding was confirmed using FAIRE-gen with the 200,000 SNP Illumina Metabochip and verified with the established method of TaqMan allelic discrimination. Examination of this SNP in two prospective Caucasian cohorts comprising 15,000 individuals confirmed the association with HDL-C levels (combined beta = 0.016; p = 0.0006, and analysis of gene expression identified an allelic association with LXR-α expression in heart tissue. Using increasingly comprehensive genotyping chips and distinct tissues for examination, FAIRE-gen has the potential to aid the identification of many causal SNPs associated with disease from GWAS.

  19. Regulatory analyses for severe accident issues: an example

    International Nuclear Information System (INIS)

    Burke, R.P.; Strip, D.R.; Aldrich, D.C.

    1984-09-01

    This report presents the results of an effort to develop a regulatory analysis methodology and presentation format to provide information for regulatory decision-making related to severe accident issues. Insights and conclusions gained from an example analysis are presented. The example analysis draws upon information generated in several previous and current NRC research programs (the Severe Accident Risk Reduction Program (SARRP), Accident Sequence Evaluation Program (ASEP), Value-Impact Handbook, Economic Risk Analyses, and studies of Vented Containment Systems and Alternative Decay Heat Removal Systems) to perform preliminary value-impact analyses on the installation of either a vented containment system or an alternative decay heat removal system at the Peach Bottom No. 2 plant. The results presented in this report are first-cut estimates, and are presented only for illustrative purposes in the context of this document. This study should serve to focus discussion on issues relating to the type of information, the appropriate level of detail, and the presentation format which would make a regulatory analysis most useful in the decisionmaking process

  20. U.S. Nuclear Regulatory Commission Role and Activities Related to U.S. Department of Energy Incidental Waste Determinations

    International Nuclear Information System (INIS)

    Bradford, A.H.; Esh, D.W.; Ridge, A.C.

    2006-01-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. Under the NDAA, NRC performs consultative technical reviews of DOE's waste determinations and monitors DOE's disposal actions for such waste, but the NRC does not have regulatory authority over DOE's waste disposal activities. The NDAA provides the criteria that must be met to determine that waste is not HLW. The criteria require that the waste does not need to be disposed of in a geologic repository, that highly radioactive radionuclides be removed to the maximum extent practical, and that the performance objectives of 10 CFR 61, Subpart C, be met. The performance objectives contain criteria for protection of the public, protection of inadvertent intruders, protection of workers, and stability of the disposal site after closure. This paper describes NRC's approach to implementing its responsibilities under the NDAA, as well as similar activities being performed for sites not covered by the NDAA. (authors)

  1. Expression of Sterol Regulatory Element-Binding Proteins in epicardial adipose tissue in patients with coronary artery disease and diabetes mellitus: preliminary study

    Science.gov (United States)

    Pérez-Belmonte, Luis M.; Moreno-Santos, Inmaculada; Cabrera-Bueno, Fernando; Sánchez-Espín, Gemma; Castellano, Daniel; Such, Miguel; Crespo-Leiro, María G; Carrasco-Chinchilla, Fernando; Alonso-Pulpón, Luis; López-Garrido, Miguel; Ruiz-Salas, Amalio; Becerra-Muñoz, Víctor M.; Gómez-Doblas, Juan J.; de Teresa-Galván, Eduardo; Jiménez-Navarro, Manuel

    2017-01-01

    Objectives: Sterol regulatory element-binding proteins (SREBP) genes are crucial in lipid biosynthesis and cardiovascular homeostasis. Their expression in epicardial adipose tissue (EAT) and their influence in the development of coronary artery disease (CAD) and type-2 diabetes mellitus remain to be determined. The aim of our study was to evaluate the expression of SREBP genes in EAT in patients with CAD according to diabetes status and its association with clinical and biochemical data. Methods: SREBP-1 and SREBP-2 mRNA expression levels were measured in EAT from 49 patients with CAD (26 with diabetes) and 23 controls without CAD or diabetes. Results: Both SREBPs mRNA expression were significantly higher in patients with CAD and diabetes (pcardiovascular risk factor for coronary artery disease in patients with type-2 diabetes (SREBP-1: OR 1.7, 95%CI 1.1-2.5, p=0.02; SREBP-2: OR 1.6, 95%CI 1.2-3, p=0.02) and were independently associated with the presence of multivessel CAD, left main and anterior descending artery stenosis, and higher total and LDL cholesterol levels, and lower HDL cholesterol levels, in patients with CAD and diabetes. Conclusions: SREBP genes are expressed in EAT and were higher in CAD patients with diabetes than those patients without CAD or diabetes. SREBP expression was associated as cardiovascular risk factor for the severity of CAD and the poor lipid control. In this preliminary study we suggest the importance of EAT in the lipid metabolism and cardiovascular homeostasis for coronary atherosclerosis of patients with diabetes and highlight a future novel therapeutic target. PMID:28367087

  2. Preliminary Products of Precise Orbit Determination Using Satellite Laser Ranging Observations for ILRS AAC

    Directory of Open Access Journals (Sweden)

    Young-Rok Kim

    2012-09-01

    Full Text Available In this study, we present preliminary results of precise orbit determination (POD using satellite laser ranging (SLR observations for International Laser Ranging Service (ILRS Associate Analysis Center (AAC. Using SLR normal point observations of LAGEOS-1, LAGEOS-2, ETALON-1, and ETALON-2, the NASA/GSFC GEODYN II software are utilized for POD. Weekly-based orbit determination strategy is applied to process SLR observations and the post-fit residuals check, and external orbit comparison are performed for orbit accuracy assessment. The root mean square (RMS value of differences between observations and computations after final iteration of estimation process is used for post-fit residuals check. The result of ILRS consolidated prediction format (CPF is used for external orbit comparison. Additionally, we performed the precision analysis of each ILRS station by post-fit residuals. The post-fit residuals results show that the precisions of the orbits of LAGEOS-1 and LAGEOS-2 are 0.9 and 1.3 cm, and those of ETALON-1 and ETALON-2 are 2.5 and 1.9 cm, respectively. The orbit assessment results by ILRS CPF show that the radial accuracies of LAGEOS-1 and LAGEOS-2 are 4.0 cm and 5.3 cm, and the radial accuracies of ETALON-1 and ETALON-2 are 30.7 cm and 7.2 cm. These results of station precision analysis confirm that the result of this study is reasonable to have implications as preliminary results for administrating ILRS AAC.

  3. Expression, purification, crystallization and preliminary X-ray analysis of calmodulin in complex with the regulatory domain of the plasma-membrane Ca2+-ATPase ACA8

    International Nuclear Information System (INIS)

    Tidow, Henning; Hein, Kim L.; Baekgaard, Lone; Palmgren, Michael G.; Nissen, Poul

    2010-01-01

    Plant plasma-membrane Ca 2+ -ATPase is regulated via binding of calmodulin to its autoinhibitory N-terminal domain. In this study, the expression, purification, crystallization and preliminary X-ray diffraction analysis of this protein complex from A. thaliana are reported. Plasma-membrane Ca 2+ -ATPases (PMCAs) are calcium pumps that expel Ca 2+ from eukaryotic cells to maintain overall Ca 2+ homoeostasis and to provide local control of intracellular Ca 2+ signalling. They are of major physiological importance, with different isoforms being essential, for example, for presynaptic and postsynaptic Ca 2+ regulation in neurons, feedback signalling in the heart and sperm motility. In the resting state, PMCAs are autoinhibited by binding of their C-terminal (in mammals) or N-terminal (in plants) tail to two major intracellular loops. Activation requires the binding of calcium-bound calmodulin (Ca 2+ -CaM) to this tail and a conformational change that displaces the autoinhibitory tail from the catalytic domain. The complex between calmodulin and the regulatory domain of the plasma-membrane Ca 2+ -ATPase ACA8 from Arabidopsis thaliana has been crystallized. The crystals belonged to space group C2, with unit-cell parameters a = 176.8, b = 70.0, c = 69.8 Å, β = 113.2°. A complete data set was collected to 3.0 Å resolution and structure determination is in progress in order to elucidate the mechanism of PMCA activation by calmodulin

  4. IAEA Mission Concludes Peer Review of Jordan's Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    Senior international nuclear safety and radiation protection experts today concluded an 11-day International Atomic Energy Agency (IAEA) Integrated Regulatory Review Service (IRRS) mission to review the regulatory framework for nuclear and radiation safety in Jordan. The mission team said in its preliminary findings that Jordan's nuclear regulator, the Energy and Minerals Regulatory Commission (EMRC), faces challenges because it is a relatively new body that handles a high workload while also working to recruit, train and keep competent staff. The team also noted that a recent merger provided the regulator with more of the resources it needs to perform its duty. The team made recommendations and suggestions to the regulatory body and the Government to help them strengthen the effectiveness of Jordan's regulatory framework and functions in line with IAEA Safety Standards. The main observations of the IRRS Review team comprised the following: The regulatory body, founded in 2007 and merged with other regulators in April 2014 to form EMRC, faces large challenges in terms of its regulatory workload, management system building and staff recruitment and training; The new EMRC structure and revision of the radiation and nuclear safety law represents an important opportunity to strengthen Jordan's radiation and nuclear safety infrastructure; The Government has shown commitment to radiation and nuclear safety through measures including becoming party to international conventions. It could further demonstrate its commitment by adopting a formal national policy and strategy for safety that defines the role of the Minister of Energy in relation to EMRC and protects the independence of regulatory decision-making

  5. Regulatory agencies and regulatory risk

    OpenAIRE

    Knieps, Günter; Weiß, Hans-Jörg

    2008-01-01

    The aim of this paper is to show that regulatory risk is due to the discretionary behaviour of regulatory agencies, caused by a too extensive regulatory mandate provided by the legislator. The normative point of reference and a behavioural model of regulatory agencies based on the positive theory of regulation are presented. Regulatory risk with regard to the future behaviour of regulatory agencies is modelled as the consequence of the ex ante uncertainty about the relative influence of inter...

  6. Comparative regulatory approaches for groups of new plant breeding techniques.

    Science.gov (United States)

    Lusser, Maria; Davies, Howard V

    2013-06-25

    This manuscript provides insights into ongoing debates on the regulatory issues surrounding groups of biotechnology-driven 'New Plant Breeding Techniques' (NPBTs). It presents the outcomes of preliminary discussions and in some cases the initial decisions taken by regulators in the following countries: Argentina, Australia, Canada, EU, Japan, South Africa and USA. In the light of these discussions we suggest in this manuscript a structured approach to make the evaluation more consistent and efficient. The issue appears to be complex as these groups of new technologies vary widely in both the technologies deployed and their impact on heritable changes in the plant genome. An added complication is that the legislation, definitions and regulatory approaches for biotechnology-derived crops differ significantly between these countries. There are therefore concerns that this situation will lead to non-harmonised regulatory approaches and asynchronous development and marketing of such crops resulting in trade disruptions. Copyright © 2013 Elsevier B.V. All rights reserved.

  7. 75 FR 8320 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13621-000] Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower...

  8. 76 FR 1613 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-01-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13877-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4, 2011. On November 4, 2010, Mahoning Hydro, LLC...

  9. 47 CFR 1.1167 - Error claims related to regulatory fees.

    Science.gov (United States)

    2010-10-01

    ...) Challenges to determinations or an insufficient regulatory fee payment or delinquent fees should be made in writing. A challenge to a determination that a party is delinquent in paying a standard regulatory fee... 47 Telecommunication 1 2010-10-01 2010-10-01 false Error claims related to regulatory fees. 1.1167...

  10. 76 FR 52656 - Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application...

    Science.gov (United States)

    2011-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14211-000] Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 10, 2011, the Rhode Island Department of Environmental Management...

  11. Intercomparison run for uranium and tritium determination in urine samples, organised by Nuclear Regulatory Authority, Argentina

    International Nuclear Information System (INIS)

    Serdeiro, Nelida H.; Equillor, Hugo E.; Bonino, Nestor O.

    2003-01-01

    The Nuclear Regulatory Authority (ARN), Argentina, has carried out an intercomparison run for tritium and uranium determination in urine, in November 2002. The aim of this exercise was to assess the performance of the laboratories that usually inform these radionuclides and to provide technical support in order to have an appropriate occupational monitoring in vitro. In the present work, the results of the intercomparison and the assessment of each laboratory are published. (author)

  12. Intercomparison run for uranium and tritium determination in urine samples, organised by Nuclear Regulatory Authority, Argentina

    CERN Document Server

    Serdeiro, N H; Equillor, H E

    2003-01-01

    The Nuclear Regulatory Authority (ARN), Argentina, has carried out an intercomparison run for tritium and uranium determination in urine, in November 2002. The aim of this exercise was to assess the performance of the laboratories that usually inform these radionuclides and to provide technical support in order to have an appropriate occupational monitoring in vitro. In the present work, the results of the intercomparison and the assessment of each laboratory are published.

  13. 75 FR 8321 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13619-000 Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed...

  14. Determinants of dermal exposure relevant for exposure modelling in regulatory risk assessment.

    Science.gov (United States)

    Marquart, J; Brouwer, D H; Gijsbers, J H J; Links, I H M; Warren, N; van Hemmen, J J

    2003-11-01

    Risk assessment of chemicals requires assessment of the exposure levels of workers. In the absence of adequate specific measured data, models are often used to estimate exposure levels. For dermal exposure only a few models exist, which are not validated externally. In the scope of a large European research programme, an analysis of potential dermal exposure determinants was made based on the available studies and models and on the expert judgement of the authors of this publication. Only a few potential determinants appear to have been studied in depth. Several studies have included clusters of determinants into vaguely defined parameters, such as 'task' or 'cleaning and maintenance of clothing'. Other studies include several highly correlated parameters, such as 'amount of product handled', 'duration of task' and 'area treated', and separation of these parameters to study their individual influence is not possible. However, based on the available information, a number of determinants could clearly be defined as proven or highly plausible determinants of dermal exposure in one or more exposure situation. This information was combined with expert judgement on the scientific plausibility of the influence of parameters that have not been extensively studied and on the possibilities to gather relevant information during a risk assessment process. The result of this effort is a list of determinants relevant for dermal exposure models in the scope of regulatory risk assessment. The determinants have been divided into the major categories 'substance and product characteristics', 'task done by the worker', 'process technique and equipment', 'exposure control measures', 'worker characteristics and habits' and 'area and situation'. To account for the complex nature of the dermal exposure processes, a further subdivision was made into the three major processes 'direct contact', 'surface contact' and 'deposition'.

  15. Preliminary studies for the determination of alpha emitters using the gross alpha coprecipitation methods

    International Nuclear Information System (INIS)

    Suarez-Navarro, J. A.; Pujol, L.; Suarez, J. A.; Pablo, M. A. de

    2003-01-01

    The radiological quality of drinking water in Spain is regulated by Nuclear Security Guideline No, 7.7 (Rev.1) of the Nuclear Security Council (NSC). this guideline establishes the protocol to follow when the radiological level exceeds 0,1 Bq.l''1. When this level is passed, the responsible alpha emitter must be identified; ''210 Po, ''226Ra, ''230Th, ''239Pu, ''224Ra, ''234 U and ''138 U. Activity due to these isotopes is usually determined using alpha spectrometry with semiconductor detectors. This method allows the activity of the alpha emitters to be determined with a good sensitivity. however, it requires long radiochemical isolations and long counting times, so the method is not suitable for rough estimate radiological analysis. In this preliminary work, we present the conditioning of the sample-precipitate that is essential for further radiochemical isolations. (Author) 9 refs

  16. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14290-000] Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...), proposing to study the feasibility of the Porcupine Dam Hydropower Project to be located on the East Fork of...

  17. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  18. Preliminary Hazard Classification for the 105-B Reactor

    International Nuclear Information System (INIS)

    Kerr, N.R.

    1997-08-01

    This document summarizes the inventories of radioactive and hazardous materials present within the 105-B Reactor and uses the inventory information to determine the preliminary hazard classification for the surveillance and maintenance activities of the facility. The result of this effort was the preliminary hazard classification for the 105-B Building surveillance and maintenance activities. The preliminary hazard classification was determined to be Nuclear Category 3. Additional hazard and accident analysis will be documented in a separate report to define the hazard controls and final hazard classification

  19. 76 FR 25322 - Oklahoma Rose Water LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13854-000] Oklahoma Rose Water LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 30, 2010, Oklahoma Rose Water LLC filed an...

  20. 75 FR 78235 - Dodge Mill Realty, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-12-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13890-000] Dodge Mill Realty, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2010. On December 3, 2010, Dodge Mill Realty...

  1. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13089-002] Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... study the feasibility of the Conway Ranch Hydropower Project to be located on Virginia Creek, near the...

  2. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2013-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14521-001, 14561-000] KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 13, 2013, KC Scoby...

  3. A motivational determinant of facial emotion recognition: regulatory focus affects recognition of emotions in faces.

    Science.gov (United States)

    Sassenrath, Claudia; Sassenberg, Kai; Ray, Devin G; Scheiter, Katharina; Jarodzka, Halszka

    2014-01-01

    Two studies examined an unexplored motivational determinant of facial emotion recognition: observer regulatory focus. It was predicted that a promotion focus would enhance facial emotion recognition relative to a prevention focus because the attentional strategies associated with promotion focus enhance performance on well-learned or innate tasks - such as facial emotion recognition. In Study 1, a promotion or a prevention focus was experimentally induced and better facial emotion recognition was observed in a promotion focus compared to a prevention focus. In Study 2, individual differences in chronic regulatory focus were assessed and attention allocation was measured using eye tracking during the facial emotion recognition task. Results indicated that the positive relation between a promotion focus and facial emotion recognition is mediated by shorter fixation duration on the face which reflects a pattern of attention allocation matched to the eager strategy in a promotion focus (i.e., striving to make hits). A prevention focus did not have an impact neither on perceptual processing nor on facial emotion recognition. Taken together, these findings demonstrate important mechanisms and consequences of observer motivational orientation for facial emotion recognition.

  4. Radioactive waste below regulatory concern

    International Nuclear Information System (INIS)

    Neuder, S.M.

    1987-01-01

    The U.S. Nuclear Regulatory Commission (NRC) published two notices in the Federal Register concerning radioactive waste below regulatory concern. The first, a Commission Policy Statement and Implementation Plan published August 29, 1986, concerns petition to exempt specific radioactive waste streams from the regulations. The second, an Advanced Notice of Proposed Rulemaking published Decemger 2, 1986, addresses the concept of generic rulemaking by the NRC on radioactive wastes that are below regulatory concern. Radioactive waste determined to be below regulatory concern would not be subject to regulatory control and would not need to go to a licensed low-level radioactive waste disposal site. The Policy Statement and Implementation Plan describe (1) the information a petitioner should file in support of a petition to exempt a specific waste stream, (2) the decision criteria the Commission intends to use for judging the petition, and (3) the internal administrative procedures to use be followed in order to permit the Commission to act upon the petition in an expedited manner

  5. Preliminary risk assessments of the small HTGR

    International Nuclear Information System (INIS)

    Everline, C.J.; Bellis, E.A.

    1985-05-01

    Preliminary investment and safety risk assessments were performed for a preconceptual design of a four-module 250-MW(t) side-by-side steel-vessel pebble bed HTGR plant. Broad event spectra were analyzed involving component damage resulting in unscheduled plant outages and fission product releases resulting in offsite doses. The preliminary assessment indicates at this stage of the design that two categories of events govern the investment risk envelope: primary coolant leaks which release some circulating and plate-out activity that contaminates the confinement and turbogenerator damage which involves extensive turbine blade failure. Primary coolant leaks are important contributors because associated cleanup and decontamination requirements result in longer outages that arise from other events with comparable frequencies. Turbogenerator damage is the salient low-frequency investment risk accident due to the relatively long outages being experienced in the industry. Thermal transients are unimportant investment risk contributors because pressurized core heatups cause little damage, and depressurized core heatups occur at negligible frequencies relative to the forced outage goal. These preliminary results demonstrate investment and safety risk goal compliance at this stage in the design process. Studies are continuing in order to provide valuable insights into risk-significant events to assure a balanced approach to meeting user and regulatory requirements

  6. Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jacques Hugo; John Forester; David Gertman; Jeffrey Joe; Heather Medema; Julius Persensky; April Whaley

    2013-04-01

    This report presents preliminary research results from the investigation in to the development of new models and guidance for concepts of operations (ConOps) in advanced small modular reactor (aSMR) designs. In support of this objective, three important research areas were included: operating principles of multi-modular plants, functional allocation models and strategies that would affect the development of new, non-traditional concept of operations, and the requiremetns for human performance, based upon work domain analysis and current regulatory requirements. As part of the approach for this report, we outline potential functions, including the theoretical and operational foundations for the development of a new functional allocation model and the identification of specific regulatory requirements that will influence the development of future concept of operations. The report also highlights changes in research strategy prompted by confirmationof the importance of applying the work domain analysis methodology to a reference aSMR design. It is described how this methodology will enrich the findings from this phase of the project in the subsequent phases and help in identification of metrics and focused studies for the determination of human performance criteria that can be used to support the design process.

  7. Development of the Level 1 PSA Model for PGSFR Regulatory

    International Nuclear Information System (INIS)

    Na, Hyun Ju; Lee, Yong Suk; Shin, Andong; Suh, Nam Duk

    2014-01-01

    SFR (sodium-cooled fast reactor) is Gen-IV nuclear energy system, which is designed for stability, sustainability and proliferation resistance. KALIMER-600 and PGSFR (Prototype Gen-IV SFR) are under development in Korea with enhanced passive safety concepts, e.g. passive reactor shutdown, passive residual heat removal, and etc. Risk analysis from a regulatory perspective is necessary for regulatory body to support the safety and licensing review of SFR. Safety issues should be identified in the early design phase in order to prevent the unexpected cost increase and the delay of PGSFR licensing schedule. In this respect, the preliminary PSA Model of KALIMER-600 had been developed for regulatory. In this study, the development of PSA Level 1 Model is presented. The important impact factors in the risk analysis for the PGSFR, such as Core Damage Frequency (CDF), have been identified and the related safety insights have been derived. The PSA level 1 model for PGSFR regulatory is developed and the risk analysis is conducted. Regarding CDF, LOISF frequency, uncertainty parameter for passive system CCF, loss of 125V DC control center bus and damper CCF are identified as the important factors. Sensitivity analyses show that the CDF would be differentiated (lowered) according to their values

  8. 75 FR 18190 - New Jersey Water Supply Authority; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-04-09

    ... Contact: Edward Buss, P.E., New Jersey Water Supply Authority, 1851 State Hwy. 31, Clinton, NJ 08800, (908... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13399-000] New Jersey Water Supply Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...

  9. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13995-000] Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 4, 2011, Mill Town Power Project filed an application for a...

  10. 75 FR 11153 - Main Mill Street Investments, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13631-000] Main Mill Street..., Motions To Intervene, and Competing Applications March 1, 2010. On November 16, Main Mill Street Investments, LLC (Main Mill Street Investments) filed an application for a preliminary permit, pursuant to...

  11. Regulatory practices of radiation safety of SNF transportation in Russia

    International Nuclear Information System (INIS)

    Kuryndina, Lidia; Kuryndin, Anton; Stroganov, Anatoly

    2008-01-01

    This paper overviews current regulatory practices for the assurance of nuclear and radiation safety during railway transportation of SNF on the territory of Russian Federation from NPPs to longterm-storage of reprocessing sites. The legal and regulatory requirements (mostly compliant with IAEA ST-1), licensing procedure for NM transportation are discussed. The current procedure does not require a regulatory approval for each particular shipment if the SNF fully comply with the Rosatom's branch standard and is transported in approved casks. It has been demonstrated that SNF packages compliant with the branch standard, which is knowingly provide sufficient safety margin, will conform to the federal level regulations. The regulatory approval is required if a particular shipment does not comply with the branch standard. In this case, the shipment can be approved only after regulatory review of Applicant's documents to demonstrate that the shipment still conformant to the higher level (federal) regulations. The regulatory review frequently needs a full calculation test of the radiation safety assurance. This test can take a lot of time. That's why the special calculation tools were created in SEC NRS. These tools aimed for precision calculation of the radiation safety parameters by SNF transportation use preliminary calculated Green's functions. Such approach allows quickly simulate any source distribution and optimize spent fuel assemblies placement in cask due to the transport equation property of linearity relatively the source. The short description of calculation tools are presented. Also, the paper discusses foreseen implications related to transportation of mixed-oxide SNF. (author)

  12. 75 FR 21289 - Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-04-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12749-002] Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting.... Charles F. Dunleavy, Oregon Wave Energy Partners I, LLC, 1590 Reed Road, Pennington, NJ 08534. FERC...

  13. Preliminary concentration and determination of Sr-90 in natural and waste water of Kursk region

    International Nuclear Information System (INIS)

    Basargin, N.N.; Rozovskij, Yu.G.; Grebennikova, R.V.; Salikhov, V.D.

    2001-01-01

    Synthesis and study of cheating sorbents containing functional analytical ortho-oxy-aza-ortho'-sulfonyl group are presented. Physicochemical properties of sorbents and chemisorption of Sr and Sr 90 are studied. A rapid method of preliminary concentration with subsequent atomic absorption and radiometric determination of Sr in natural and waste water is proposed. Samples of aqua-objects of Kursk region were analyzed using developed method. The results of radiometric investigations into control of strontium-90 content in cooling systems of Kursk NPP, waste waters, waters of Sejm river testifies higher values of concentration in the april - september period [ru

  14. Status of the PSA use in the Czech regulatory process

    International Nuclear Information System (INIS)

    Dusek, J.

    1994-01-01

    A review of previous probabilistic safety assessment (PSA) activities initiated by regulatory body and preparation of the preliminary PSA study and final PSA study (released in January 1994) for the nuclear power plant Dukovany with WWER-440 type 213 reactor is described. A brief information about the NPP Temelin (with WWER-1000) PSA Study, shutdown and PSA risk monitor current activities for the NPP Dukovany, next PSA activities in 1994 and about planned PSA activities in future is attached. (author). 21 refs

  15. Delay-independent stability of genetic regulatory networks.

    Science.gov (United States)

    Wu, Fang-Xiang

    2011-11-01

    Genetic regulatory networks can be described by nonlinear differential equations with time delays. In this paper, we study both locally and globally delay-independent stability of genetic regulatory networks, taking messenger ribonucleic acid alternative splicing into consideration. Based on nonnegative matrix theory, we first develop necessary and sufficient conditions for locally delay-independent stability of genetic regulatory networks with multiple time delays. Compared to the previous results, these conditions are easy to verify. Then we develop sufficient conditions for global delay-independent stability for genetic regulatory networks. Compared to the previous results, this sufficient condition is less conservative. To illustrate theorems developed in this paper, we analyze delay-independent stability of two genetic regulatory networks: a real-life repressilatory network with three genes and three proteins, and a synthetic gene regulatory network with five genes and seven proteins. The simulation results show that the theorems developed in this paper can effectively determine the delay-independent stability of genetic regulatory networks.

  16. Development of PSA audit guideline and regulatory PSA model for SMART

    International Nuclear Information System (INIS)

    Cho, Namchul; Lee, Chang-Ju; Kim, I.S.

    2012-01-01

    SMART is under development for dual purposes of power generation and seawater desalination in Korea. It is an integral reactor type with a thermal power output of 330 MW and employs advanced design features such as a passive system for the removal of residual heat and also the setting of all the components of the primary system inside the reactor pressure vessel. It is essential to develop new probabilistic safety assessment (PSA) validation guidance for SMART. For the purpose of regulatory verification to the risk level of SMART, the insights and key issues on the PSA are identified with referring some worldwide safety guides as well as its design characteristics. Regulatory PSA model under the development for the design confirmation and its preliminary result are also described. (authors)

  17. Policy, regulatory and international spects of the disposal of low - and intermediate radioactive waste and other hazardous waste

    International Nuclear Information System (INIS)

    Olivier, J.P.

    1989-01-01

    This paper focuses on the management of low- and intermediate-level radioactive waste. It recalls briefly the technical background and the main features of the regulatory systems adopted by most countries for their radioactive wastes, the respective role of technical and institutional measures contributing to safety, and the influence of international cooperation. A very preliminary attempt is made to draw a parallel with the situation existing for other hazardous wastes, underlying in particular those aspects which seem important in the discussion of management and regulatory policies

  18. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  19. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  20. 76 FR 34975 - U.S. Farmers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-06-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14102-000] U.S. Farmers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 22, 2011, U.S. Farmers, LLC filed an application for a...

  1. 77 FR 60424 - FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13484-001] FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, FFP Project 73, LLC filed an application for a...

  2. Determinants of Effective Information Transfer in International Regulatory Standards Adoption

    Science.gov (United States)

    Popescu, Denisa

    2010-01-01

    The role of international regulatory standards within the current global environment has become of the most importance. The age of the global system and free market capitalism carried us into the unprecedented age of regulations, and standard setting. Regulations are now becoming the emerging mode of global governance. This study focuses on…

  3. Preliminary assessment on the competency of technical staff of Atomic Energy Licensing Board

    International Nuclear Information System (INIS)

    Marina Mishar; Redzuwan Yahya

    2010-01-01

    The main purpose of this study is to carry out a preliminary assessment on the competency level of technical staff of Atomic Energy Licensing Board (AELB), the nuclear regulatory body in Malaysia for effectively monitoring and supervising the activities of the first nuclear power plant in Malaysia. The study is conducted out on the whole group of AELB technical staff, comprising 81 personnel from the supporting and professional categories. Findings showed that AELB technical staff who have been in the workforce for more than ten years have the required competency level for legal and regulatory processes competencies, regulatory practices competencies and effectiveness in personal and inter-personal competencies. Regression analysis between competency and working experience (length of service) showed a weak positive correlation, which could be contributed by job not related to the competency parameters for major functions of a regulatory body in controlling nuclear activity of a nuclear power plant. Results obtained could assist AELB in manpower development once Malaysia makes the decision to embark on a nuclear power programme. (author)

  4. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13824-000, 13826-000] FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary Permit... Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC, Project No. 13824-000. Dated: February 22...

  5. Mapping the nomological network of employee self-determined safety motivation: A preliminary measure in China.

    Science.gov (United States)

    Jiang, Li; Tetrick, Lois E

    2016-09-01

    The present study introduced a preliminary measure of employee safety motivation based on the definition of self-determination theory from Fleming (2012) research and validated the structure of self-determined safety motivation (SDSM) by surveying 375 employees in a Chinese high-risk organization. First, confirmatory factor analysis (CFA) was used to examine the factor structure of SDSM, and indices of five-factor model CFA met the requirements. Second, a nomological network was examined to provide evidence of the construct validity of SDSM. Beyond construct validity, the analysis also produced some interesting results concerning the relationship between leadership antecedents and safety motivation, and between safety motivation and safety behavior. Autonomous motivation was positively related to transformational leadership, negatively related to abusive supervision, and positively related to safety behavior. Controlled motivation with the exception of introjected regulation was negatively related to transformational leadership, positively related to abusive supervision, and negatively related to safety behavior. The unique role of introjected regulation and future research based on self-determination theory were discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Preliminary Study of Testosterone and Empathy in Determining Recidivism and Antisocial Behavior.

    Science.gov (United States)

    House, Samuel J; Laan, Jacob M; Molden, Raymond K; Ritchie, James C; Stowe, Zachary N

    2017-09-01

    Recidivism, repeated criminal behavior after conviction and correction of prior offenses, is a costly problem across the nation. However, the contribution of empathy in determining the risk of recidivism has received limited attention, although lack of empathy has been related to antisocial personality disorder in various studies. Studies linked testosterone to aggression, antisocial behavior, and criminality, and evidence support hormonal connections between empathy and aggression. Adult male prison inmates convicted of violent or nonviolent offenses were included in a cross-sectional study of empathy, antisocial behavior, salivary testosterone, and recidivism. Subjects underwent criminal history, Empathy Quotient, Levenson Self-Report Psychopathy Scale, Beck Depression Inventory, Spielberger State-Trait Anxiety Inventory, and salivary testosterone assays. Bivariate analyses indicated multiple correlations between variables. Multivariate modeling analyses found a significant relationship between self-reported conviction number and psychopathy scale score (p = 0.013). These preliminary results suggest avenues of investigation of factors contributing to recidivism risk. © 2017 American Academy of Forensic Sciences.

  7. As to achieve regulatory action, regulatory approaches

    International Nuclear Information System (INIS)

    Cid, R.; Encinas, D.

    2014-01-01

    The achievement of the effectiveness in the performance of a nuclear regulatory body has been a permanent challenge in the recent history of nuclear regulation. In the post-Fukushima era this challenge is even more important. This article addresses the subject from two complementary points of view: the characteristics of an effective regulatory body and the regulatory approaches. This work is based on the most recent studies carried out by the Committee on Nuclear Regulatory Activities, CNRA (OECD/NEA), as well as on the experience of the Consejo de Seguridad Nuclear, CSN, the Spanish regulatory body. Rafael Cid is the representative of CSN in these project: Diego Encinas has participated in the study on regulatory approaches. (Author)

  8. Determination of the Regulatory Asset Base of power distribution companies. Background report of 'Guidelines for price cap regulation in the Dutch electricity sector'

    International Nuclear Information System (INIS)

    Tjin, T.; Buitelaar, T.

    2000-02-01

    July 1999 The Netherlands Electricity Regulatory Service (DtE) published an Information and Consultation Document on the subject of 'Price Cap Regulation in the Dutch Electricity Sector'. By means of price cap regulation tariffs are determined such that businesses are stimulated continuously to organize their total processes and operation as efficient as possible. In the consultation document a large number of questions with respect to the future organization and planning of the system of economic regulation of the electricity sector in the Netherlands can be found. Many reactions and answers were received, compiled and analyzed. The results are presented in the main report, which forms the framework for the DtE to shape the economic regulation of the Dutch electricity sector. In this background document attention is paid to a method to determine the Regulatory Asset Base (RAB)

  9. Impact of regulatory science on global public health

    OpenAIRE

    Meghal Patel; Margaret Ann Miller

    2012-01-01

    Regulatory science plays a vital role in protecting and promoting global public health by providing the scientific basis for ensuring that food and medical products are safe, properly labeled, and effective. Regulatory science research was first developed for the determination of product safety in the early part of the 20th Century, and continues to support innovation of the processes needed for regulatory policy decisions. Historically, public health laws and regulations were enacted followi...

  10. Methodology and preliminary models for analyzing nuclear-safeguards decisions

    International Nuclear Information System (INIS)

    Judd, B.R.; Weissenberger, S.

    1978-11-01

    This report describes a general analytical tool designed with Lawrence Livermore Laboratory to assist the Nuclear Regulatory Commission in making nuclear safeguards decisions. The approach is based on decision analysis - a quantitative procedure for making decisions under uncertain conditions. The report: describes illustrative models that quantify the probability and consequences of diverted special nuclear material and the costs of safeguarding the material; demonstrates a methodology for using this information to set safeguards regulations (safeguards criteria); and summarizes insights gained in a very preliminary assessment of a hypothetical reprocessing plant

  11. Needs of research for regulatory purposes

    International Nuclear Information System (INIS)

    Wanner, H.

    2010-01-01

    Hans Wanner, Swiss Federal Nuclear Safety Inspectorate (ENSI), presented a general overview of regulatory research at the international level based on a preliminary input from international colleagues and observed that the question of active involvement of nuclear regulatory and supervisory bodies in R and D projects has become a topic of increasing interest in recent years even if the way in which research is included in regulatory activities varies from country to country. The range spans from countries with no regulatory R and D activities to countries with extensive activities that are often carried out by independent research organisations acting on behalf of the regulatory body. In a few countries, the regulator and implementer have their research carried out by the same research institutes. As an example H. Wanner explained the organisation of R and D work in Switzerland. He presented the potential merits of R and D work carried out by the regulator and introduced a number of questions that would gain from being addressed at an international level. He stressed that the R and D work performed by the implementer must be comprehensive and there should be, in principle, no need for complementary work by the regulatory body. Nevertheless, R and D work of the regulator has still several merits. It improves the regulator's necessary competence to review the safety case allowing it to rely on the scientific community. It provides the regulator's independence, allowing a different view on the safety case from the implementer's view. By bringing to the fore the scientific and technical ability of the regulator, R and D work by the regulator provides additional confidence to the stakeholders in the credibility of the regulator. There may exist further motivations for the regulator to carry out its own R and D projects, among which is the verification of key safety issues or the investigation of topics not addressed by the implementer, i.e., to fill scientific gaps. The

  12. ANSI/ASHRAE/IES Standard 90.1-2013 Preliminary Determination: Quantitative Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, Mark A.; Rosenberg, Michael I.; Wang, Weimin; Zhang, Jian; Mendon, Vrushali V.; Athalye, Rahul A.; Xie, YuLong; Hart, Reid; Goel, Supriya

    2014-03-01

    This report provides a preliminary quantitative analysis to assess whether buildings constructed according to the requirements of ANSI/ASHRAE/IES Standard 90.1-2013 would result in energy savings compared with buildings constructed to ANSI/ASHRAE/IES Standard 90.1-2010.

  13. 75 FR 66083 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13723-000] Iron Mask Hydro..., Iron Mask Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Iron Mask Pumped Storage Project to be...

  14. Preliminary study on element mass fraction determination on catfish samples from Paraguay

    International Nuclear Information System (INIS)

    Moreira, Edson G.; Catharino, Marilia G.M.; Vasconcellos, Marina B.A.; Frutos, Sixto A.; Insaurralde, Mario S.

    2013-01-01

    South American catfish (Pseudoplatystoma), commonly known in Spanish as atigrado or surubi and in Portuguese as surubim or pintado is a large fish that typically reaches 1 m long and weighs 60 kg to 80 kg and may be found at the basins of the Amazon, the Sao Francisco and de la Plata rivers, usually in riverbeds and deep wells. Being a much appreciated fish for human consumption, it is quite sought after by fishermen who have been contributing to the reduction of the stocks. This fact attracted the attention of the Paraguayan authorities to the point of imposing restrictions to free fishing and commercialization. This study aims to assist the conservation efforts towards this fish by investigating its exposure to possible pollutants. Preliminary results on element determination on six samples of catfish from Paraguayan rivers are presented. Cs, Co, Fe, Se and Zn were determined by applying an Instrumental Neutron Activation Analysis method. While these element levels were lower than the legislation for human consumption, the elements As, Cr e La were not detected in the samples as they are below the detection limit of the method employed. Atomic Absorption Spectrometry was used to investigate the presence of Cd, Hg and Pb in the samples. Hg was detected in the samples while Cd and Pb were below the detection limit of the method. (author)

  15. Preliminary study on element mass fraction determination on catfish samples from Paraguay

    Energy Technology Data Exchange (ETDEWEB)

    Moreira, Edson G.; Catharino, Marilia G.M.; Vasconcellos, Marina B.A., E-mail: emoreira@ipen.br, E-mail: mbvascon@ipen.br, E-mail: mariliasemmler@uol.com.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Frutos, Sixto A.; Insaurralde, Mario S., E-mail: tony8013@hotmail.com, E-mail: insaurraldemar9@hotmail.com [Universidad Nacional de Asuncion (FCV/UNA), San Lorenzo (Paraguay). Facultad de Ciencias Veterinarias. Departamento de Pesca y Acuicultura

    2013-07-01

    South American catfish (Pseudoplatystoma), commonly known in Spanish as atigrado or surubi and in Portuguese as surubim or pintado is a large fish that typically reaches 1 m long and weighs 60 kg to 80 kg and may be found at the basins of the Amazon, the Sao Francisco and de la Plata rivers, usually in riverbeds and deep wells. Being a much appreciated fish for human consumption, it is quite sought after by fishermen who have been contributing to the reduction of the stocks. This fact attracted the attention of the Paraguayan authorities to the point of imposing restrictions to free fishing and commercialization. This study aims to assist the conservation efforts towards this fish by investigating its exposure to possible pollutants. Preliminary results on element determination on six samples of catfish from Paraguayan rivers are presented. Cs, Co, Fe, Se and Zn were determined by applying an Instrumental Neutron Activation Analysis method. While these element levels were lower than the legislation for human consumption, the elements As, Cr e La were not detected in the samples as they are below the detection limit of the method employed. Atomic Absorption Spectrometry was used to investigate the presence of Cd, Hg and Pb in the samples. Hg was detected in the samples while Cd and Pb were below the detection limit of the method. (author)

  16. Statistical significance of cis-regulatory modules

    Directory of Open Access Journals (Sweden)

    Smith Andrew D

    2007-01-01

    Full Text Available Abstract Background It is becoming increasingly important for researchers to be able to scan through large genomic regions for transcription factor binding sites or clusters of binding sites forming cis-regulatory modules. Correspondingly, there has been a push to develop algorithms for the rapid detection and assessment of cis-regulatory modules. While various algorithms for this purpose have been introduced, most are not well suited for rapid, genome scale scanning. Results We introduce methods designed for the detection and statistical evaluation of cis-regulatory modules, modeled as either clusters of individual binding sites or as combinations of sites with constrained organization. In order to determine the statistical significance of module sites, we first need a method to determine the statistical significance of single transcription factor binding site matches. We introduce a straightforward method of estimating the statistical significance of single site matches using a database of known promoters to produce data structures that can be used to estimate p-values for binding site matches. We next introduce a technique to calculate the statistical significance of the arrangement of binding sites within a module using a max-gap model. If the module scanned for has defined organizational parameters, the probability of the module is corrected to account for organizational constraints. The statistical significance of single site matches and the architecture of sites within the module can be combined to provide an overall estimation of statistical significance of cis-regulatory module sites. Conclusion The methods introduced in this paper allow for the detection and statistical evaluation of single transcription factor binding sites and cis-regulatory modules. The features described are implemented in the Search Tool for Occurrences of Regulatory Motifs (STORM and MODSTORM software.

  17. Preliminary performance analysis of exponential experimental system for the determination of neutron effective multiplication factor of PWR spent fuel

    International Nuclear Information System (INIS)

    Shin, Heesung; Lee, Sang-Yun; Ro, Seung-Gy; Seo, Gi-Seok; Kim, Ho-Dong

    2002-01-01

    An exponential experiment system which is composed of neutron detector, signal analysis system and neutron source, 10 mCi Cf-252 has been installed in the storage pool of PIEF at KAERI in order to experimentally determining neutron effective multiplication factors of PWR spent fuel assemblies. Preliminary functional characteristic tests of the experimental system are performed for C15, J14 and J44 assemblies loaded in the pool. As a result of preliminary tests, the average neutron counts obtained for 3 minutes in the plateau of the C15, J14 and J44 assemblies are about 1900, 3800 and 3200, respectively. A dip of the neutron flux density distribution is noticed in the spacer grid position. Neutron counts at those positions appear to be reduced to about 70 % in comparison to the fuel position. The measured axial neutron distribution shapes are compared with the result for the P14 assembly and Cs-137 gamma scanning data performed in KAERI. It is revealed that the spacer grid position measured is consistent with the design specifications within a 2.3 % error. The exponential decay constants for the C15 assembly were determined to be 0.152 and 0.165 for detector and source scanning, respectively. (author)

  18. A Preliminary Fire PSA on PGSFR

    International Nuclear Information System (INIS)

    Kim, Kilyoo; Han, Sanghoon; Lee, KwiLim

    2017-01-01

    A Prototype Generation IV Sodium Fast Reactor (PGSFR) is under design with defense in depth concept with active, passive, and inherent safety features to acquire a design approval for PGSFR from Korean regulatory authority by around 2017. A preliminary fire PSA on PGSFR is done in 2016 and a final fire PSA of PGSFR will be done in 2017. The characteristics of the preliminary fire PSA on PGSFR are described in this paper. Since PGSFR is very safe reactor, it is not bad approach to use a conservative assumption in the preliminary PSA. In addition, several drawings including cable routing are not yet issued, a conservative calculation for CDF is performed. As shown in Table 2, the CDF caused by the fire in the control room takes 89% portion of total CDF. Thus, a detailed fire modeling for control room is necessary for the final fire PSA on PGSFR. Also, the increased ignition frequency due to sodium leak would be derived by considering the sodium piping complexity in the final fire PSA on PGSFR. The 4th column of Table 2 is derived the 3rd column by multiplying the factor (592/1177). The 5th column is the ignition frequency caused by the sodium leak. The 6th column is derived by summing the 4th column and the 5th column. The 7th column is the CDF portion of each fire area. The control room (fire area F-A404A) is the most important area since the control room fire takes 89% portion of total CDF.

  19. Future water table rise at Yucca Mountain: A regulatory perspective

    International Nuclear Information System (INIS)

    Coleman, N.M.

    1995-01-01

    The U.S. Nuclear Regulatory Commission staff has developed a program of Systematic Regulatory Analysis (SRA). The purpose of this program is to ensure that important technical issues related to compliance with 10 CFR Part 60 will be identified before receipt of a license application. A plan is being developed to review the U.S. Department of Energy's (DOE's) demonstration of compliance in the license application for each part of the regulation. Under the siting criteria of NRC's Part 60, one of the potentially adverse conditions is the possibility that the water table may rise high enough to saturate a repository in the unsaturated zone. DOE must evaluate this and other conditions in a license application for a geologic repository site. DOE's evaluation must show compliance with the requirements of Part 60 with reasonable assurance. This paper describes the NRC staff's preliminary plans to review DOE's demonstration of compliance, including assumptions about a future rise of the water table

  20. Preliminary perspectives gaines from individual plant examination of external events (IPEEE) seismic and fire submittal review

    International Nuclear Information System (INIS)

    Chen, J.T.; Connell, E.; Chokshi, N.

    1997-01-01

    As a result of the U.S. Nuclear Regulatory Commission (USNRC) initiated Individual plant Examination of External Events (IPEEE) program, every operating nuclear power reactor in the United States has performed an assessment of severe accident due to external events. This paper provides a summary of the preliminary insights gained through the review of 24 IPEEE submittals

  1. Proposed preliminary definition of the disturbed-zone boundary appropriate for a repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Langkopf, B.S.

    1987-12-01

    Some of the calculations that support the licensing of a repository for high-level radioactive waste will use the regulatory concept of a disturbed zone. The Nevada Nuclear Waste Storage Investigations (NNWSI) project must determine the location of the boundary of the disturbed zone for use in these calculations. This paper summarizes results of computer analyses and laboratory experiments and suggests a preliminary definition for the boundary of the disturbed zone for the unsaturated environment at Yucca Mountain. Although the intent of this paper is to define the boundary of the disturbed zone at the edge of significant changes in intrinsic hydrologic properties, there is no evidence of changes in intrinsic hydrologic properties that could significantly change the groundwater travel time from the repository to the water table. Such a result suggests that the disturbed zone at Yucca Mountain is of minimal extent. Because the analyses and experiments reviewed here indicate that there are a variety of changes near the waste package and because the results are subject to uncertainty, the preliminary suggestion for the extent of the disturbed zone is a value larger than the results themselves would suggest: the boundary is proposed to be a plane 10 m below the lower boundary of the waste packages. 88 refs., 12 figs., 5 tabs

  2. ATMPs for Cancer Immunotherapy: A Regulatory Overview.

    Science.gov (United States)

    Galli, Maria Cristina

    2016-01-01

    This chapter discusses European regulatory requirements for development of advanced therapy medicinal products (ATMP) for cancer immunotherapy approaches, describing the framework for clinical trials and for marketing authorization.Regulatory critical issues and challenges for developing ATMP are also discussed, with focus on potency determination, long-term follow-up, comparability, and insertional mutagenesis issues. Some of the most critical features of GMP application to ATMP are also described.

  3. US Department of Energy wind turbine candidate site program: the regulatory process

    Energy Technology Data Exchange (ETDEWEB)

    Greene, M.R.; York, K.R.

    1982-06-01

    Sites selected in 1979 as tentative sites for installation of a demonstration MOD-2 turbine are emphasized. Selection as a candidate site in this program meant that the US Department of Energy (DOE) designated the site as eligible for a DOE-purchased and installed meteorological tower. The regulatory procedures involved in the siting and installation of these meteorological towers at the majority of the candidate sites are examined. An attempt is also made, in a preliminary fashion, to identify the legal and regulatory procedures that would be required to put up a turbine at each of these candidate sites. The information provided on each of these sites comes primarily from utility representatives, supplemented by conversations with state and local officials. The major findings are summarized on the following: federal requirements, state requirements, local requirements, land ownership, wind rights, and public attitudes.

  4. Harnessing diversity towards the reconstructing of large scale gene regulatory networks.

    Directory of Open Access Journals (Sweden)

    Takeshi Hase

    Full Text Available Elucidating gene regulatory network (GRN from large scale experimental data remains a central challenge in systems biology. Recently, numerous techniques, particularly consensus driven approaches combining different algorithms, have become a potentially promising strategy to infer accurate GRNs. Here, we develop a novel consensus inference algorithm, TopkNet that can integrate multiple algorithms to infer GRNs. Comprehensive performance benchmarking on a cloud computing framework demonstrated that (i a simple strategy to combine many algorithms does not always lead to performance improvement compared to the cost of consensus and (ii TopkNet integrating only high-performance algorithms provide significant performance improvement compared to the best individual algorithms and community prediction. These results suggest that a priori determination of high-performance algorithms is a key to reconstruct an unknown regulatory network. Similarity among gene-expression datasets can be useful to determine potential optimal algorithms for reconstruction of unknown regulatory networks, i.e., if expression-data associated with known regulatory network is similar to that with unknown regulatory network, optimal algorithms determined for the known regulatory network can be repurposed to infer the unknown regulatory network. Based on this observation, we developed a quantitative measure of similarity among gene-expression datasets and demonstrated that, if similarity between the two expression datasets is high, TopkNet integrating algorithms that are optimal for known dataset perform well on the unknown dataset. The consensus framework, TopkNet, together with the similarity measure proposed in this study provides a powerful strategy towards harnessing the wisdom of the crowds in reconstruction of unknown regulatory networks.

  5. Development of regulatory guidance for risk-informing digital system reviews

    International Nuclear Information System (INIS)

    Arndt, S. A.

    2006-01-01

    In 1995, the U.S. Nuclear Regulatory Commission (NRC) issued the Probabilistic Risk Assessment (PRA) Policy Statement, which encourages the increased use of PRA and associated analyses in all regulatory matters to the extent supported by the state-of-the-art in PRA and the data. This policy applies, in part, to the review of digital systems, which offer the potential to improve plant safety and reliability through such features as increased hardware reliability and stability and improved failure detection capability. However, there are presently no universally accepted methods for modeling digital systems in current-generation PRAs. Further, there are ongoing debates among the PRA technical community regarding the level of detail that any digital system reliability model must have to adequately model the complex system interactions that can contribute to digital system failure modes. Moreover, for PRA modeling of digital reactor protection and control systems, direct interactions between system components and indirect interactions through controlled/supervised plant processes may necessitate the use of dynamic PRA methodologies. This situation has led the NRC to consider developing performance based rather than prescriptive regulatory guidance in this area. This paper will discuss the development of this guidance and some preliminary concepts. (authors)

  6. French regulatory approach to establishing the safety case for ageing NPP's

    International Nuclear Information System (INIS)

    Delage, M.

    1994-06-01

    The French regulatory procedures make provision for three main stages in the safety assessment of nuclear power plants. The first stage ends up with the construction licence and focuses on the assessment of the preliminary safety report. The second stage makes it possible to issue the fuel loading approval following evaluation of the provisional safety report. The third stage permits to declare the start of normal operation of the installation. The procedure, the tests and the assessment forming the overall strategy for safety regulations are described in detail. (R.P.)

  7. Regulatory issues for nuclear power plant life management

    International Nuclear Information System (INIS)

    Roe, J.

    2000-01-01

    The workshop of 26-27 june 2000, on nuclear power Plant LIfe Management (PLIM), also included working groups in which major issues facing PLIM activities for nuclear power plants were identified and discussed. The second group was on Regulation. The Regulatory Working Group will attempt to identify some of the more pertinent issues affecting nuclear plant regulation in a changing PLIM environment, to identify some possible actions to be taken to address these issues, and to identify some of the parties responsible for taking these actions. Some preliminary regulatory issues are noted below. This is not intended to be a comprehensive list of such issues but rather is intended to stimulate discussion among the experts attending this Workshop. One of the concerns in the regulatory arena is how the structural integrity of the plants can be assured for an extended lifetime. Technological advances directed toward the following are likely to be important factors in the regulatory process of life extension. - Preventive and corrective maintenance (e.g., water chemistry control, pressure vessel annealing, and replacement of core internals). - Ageing and degradation mechanisms and evaluation (e.g., embrittlement, wear, corrosion/erosion, fatigue, and stress corrosion). - Monitoring, surveillance, and inspection (e.g., fatigue monitoring and non-destructive testing). - Optimisation of maintenance (e.g., using risk-based analysis). On the business side, there is concern about technical support by manufacturers, fuel companies, and construction companies. Maintaining a strong technical base and skilled workers in a potentially declining environment is another concern in the regulatory community. Waste management and decommissioning remain significant issue regarding PLIM. These issues affect all three areas of concern - technology, business, and regulation. It is against this background, that the issues put forth in this paper are presented. The objective of presenting these

  8. Development of a preliminary decommissioning plan of the reactor IPEN/MB-01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza; Carneiro, Alvaro Luiz Guimaraes

    2013-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend, through publications, guidelines for the conduct of activities both for decommissioning nuclear power plants and for research reactors, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors, having only a standard applied to decommissioning power plants which was published in November 2012. The Nuclear and Energy Research Institute (IPEN) has two research reactors one being the reactor IPEN/MB-01. The aim of this work is to develop a preliminary plan for decommissioning of nuclear reactor research, considering the technical documentation of the system (RAS-Safety Analysis Report), the existing rules of CNEN (National Nuclear Energy Commission), as well as regulatory instructions and recommendations of the IAEA. The preliminary decommissioning plan consists of the presentation of actions and steps required as well as the strategies to be adopted for the shutdown of the facility under the technical and administrative, seeking the safety, health workers and the general public, minimizing environmental impacts. (author)

  9. Challenges and opportunities in establishing scientific and regulatory standards for determining therapeutic equivalence of modified-release products: Workshop summary report.

    Science.gov (United States)

    Chen, Mei-Ling; Shah, Vinod P; Ganes, Derek; Midha, Kamal K; Caro, James; Nambiar, Prabu; Rocci, Mario L; Thombre, Avinash G; Abrahamsson, Bertil; Conner, Dale; Davit, Barbara; Fackler, Paul; Farrell, Colm; Gupta, Suneel; Katz, Russell; Mehta, Mehul; Preskorn, Sheldon H; Sanderink, Gerard; Stavchansky, Salomon; Temple, Robert; Wang, Yaning; Winkle, Helen; Yu, Lawrence

    2010-09-01

    Modified-release (MR) products are complex dosage forms designed to release drug in a controlled manner to achieve the desired efficacy and safety profiles. Inappropriate control of drug release from such products may result in reduced efficacy or increased toxicity. This paper is a summary report of the American Association of Pharmaceutical Scientists, International Pharmaceutical Federation, and Product Quality Research Institute workshop titled "Challenges and Opportunities in Establishing Scientific and Regulatory Standards for Assuring Therapeutic Equivalence of Modified Release Products", held October 1-2, 2009, in Baltimore, Maryland. The workshop provided an opportunity for pharmaceutical scientists from academia, industry, and regulatory agencies to discuss current regulatory expectations and industry practices for evaluating the pharmaceutical equivalence and bioequivalence of oral MR products. In the case of conventional monophasic MR formulations, the current regulatory approaches and criteria for bioequivalence evaluation were considered adequate for the assessment of therapeutic equivalence and inter-changeability of drug products. Additional measures may occasionally be needed to determine the bioequivalence of multiphasic MR products. The metric of partial AUC proposed by the US Food and Drug Administration received broad support as an additional measure for evaluating bioequivalence of multiphasic MR products designed to have a rapid onset of drug action followed by sustained response. The cutoff for partial AUCs may be based on the pharmacokinetic/pharmacodynamic or pharmacokinetic/ response characteristics of the products under examination. If the new metric is highly variable, the bioequivalence limits may be set based on the known within-subject variability for the reference product. The current regulatory approaches and criteria for bioequivalence evaluation were considered adequate for the assessment of therapeutic equivalence and

  10. 78 FR 41784 - Uncovered Innerspring Units From the People's Republic of China: Affirmative Preliminary...

    Science.gov (United States)

    2013-07-11

    ... From the People's Republic of China: Affirmative Preliminary Determination of Circumvention of the... United States. Methodology The Department has conducted this preliminary determination of circumvention... Determination of Circumvention of the Antidumping Duty Order, 76 FR 47554 (August 5, 2011). Notification to the...

  11. Preliminary Safety Information Document for the Standard MHTGR. Volume 1, (includes latest Amendments)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-01-01

    With NRC concurrence, the Licensing Plan for the Standard HTGR describes an application program consistent with 10CFR50, Appendix O to support a US Nuclear Regulatory Commission (NRC) review and design certification of an advanced Standard modular High Temperature Gas-Cooled Reactor (MHTGR) design. Consistent with the NRC's Advanced Reactor Policy, the Plan also outlines a series of preapplication activities which have as an objective the early issuance of an NRC Licensability Statement on the Standard MHTGR conceptual design. This Preliminary Safety Information Document (PSID) has been prepared as one of the submittals to the NRC by the US Department of Energy in support of preapplication activities on the Standard MHTGR. Other submittals to be provided include a Probabilistic Risk Assessment, a Regulatory Technology Development Plan, and an Emergency Planning Bases Report.

  12. Problems of use of preliminary information technology in maritime passes

    Directory of Open Access Journals (Sweden)

    Elena I. Antonova

    2017-12-01

    Full Text Available The technology of preliminary informing is the priority direction of development of information technologies in the customs authorities. Russian model prior information on Maritime transport contains a number of features that distinguish it from world practice. The studied is the possibility of creating a unified information system of state regulatory bodies in the Maritime checkpoints. The article considers one of directions of automation of information interaction between Maritime stakeholders in the conduct of customs and other types of state control with the use of a single information space, based on the then-experimental solutions. Analysis of experience of implementation and operation of the software complex "Portal port" in the region of the Vladivostok customs have helped to identify problems in the application of the technology of preliminary information on Maritime transport. The proposed solutions to these problems provide an opportunity to work on improvement of this technology and to introduce mandatory preliminary notification in all sea checkpoints on the territory of the Russian Federation, will allow to optimize the performance of customs and other state Supervisory authorities at the seaport, us-blame the turnover and will contribute to the development of the far Eastern region as a whole.

  13. Eating on impulse: Implicit attitudes, self-regulatory resources, and trait self-control as determinants of food consumption.

    Science.gov (United States)

    Wang, Yan; Wang, Lei; Cui, Xianghua; Fang, Yuan; Chen, Qianqiu; Wang, Ya; Qiang, Yao

    2015-12-01

    Self-regulatory resources and trait self-control have been found to moderate the impulse-behavior relationship. The current study investigated whether the interaction of self-regulatory resources and trait self-control moderates the association between implicit attitudes and food consumption. One hundred twenty female participants were randomly assigned to either a depletion condition in which their self-regulatory resources were reduced or a no-depletion condition. Participants' implicit attitudes for chocolate were measured with the Single Category Implicit Association Test and self-report measures of trait self-control were collected. The dependent variable was chocolate consumption in an ostensible taste and rate task. Implicit attitudes predicted chocolate consumption in depleted participants but not in non-depleted participants. However, this predictive power of implicit attitudes on eating in depleted condition disappeared in participants with high trait self-control. Thus, trait self-control and self-regulatory resources interact to moderate the prediction of implicit attitude on eating behavior. Results suggest that high trait self-control buffers the effect of self-regulatory depletion on impulsive eating. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. A regulatory adjustment process for the determination of the optimal percentage requirement in an electricity market with Tradable Green Certificates

    International Nuclear Information System (INIS)

    Currier, Kevin M.

    2013-01-01

    A system of Tradable Green Certificates (TGCs) is a market-based subsidy scheme designed to promote electricity generation from renewable energy sources such as wind power. Under a TGC system, the principal policy instrument is the “percentage requirement,” which stipulates the percentage of total electricity production (“green” plus “black”) that must be obtained from renewable sources. In this paper, we propose a regulatory adjustment process that a regulator can employ to determine the socially optimal percentage requirement, explicitly accounting for environmental damages resulting from black electricity generation. - Highlights: • A Tradable Green Certificate (TGC) system promotes energy production from renewable sources. • We consider an electricity oligopoly operated under a TGC system. • Welfare analysis must account for damages from “black” electricity production. • We characterize the welfare maximizing (optimal) “percentage requirement.” • We present a regulatory adjustment process that computes the optimal percentage requirement iteratively

  15. Space reactor preliminary mechanical design

    International Nuclear Information System (INIS)

    Meier, K.L.

    1983-01-01

    An analysis was performed on the SABRE reactor space power system to determine the effect of the number and size of heat pipes on the design parameters of the nuclear subsystem. Small numbers of thin walled heat pipes were found to give a lower subsystem mass, but excessive fuel swelling resulted. The SP-100 preliminary design uses 120 heat pipes because of acceptable fuel swelling and a minimum nuclear subsystem mass of 1875 kg. Salient features of the reactor preliminary design are: individual fuel modules, ZrO 2 block core mounts, bolted collar fuel module restraints, and a BeO central plug

  16. French regulatory approach to establishing the safety case for ageing NPP`s

    Energy Technology Data Exchange (ETDEWEB)

    Delage, M.

    1994-06-15

    The French regulatory procedures make provision for three main stages in the safety assessment of nuclear power plants. The first stage ends up with the construction licence and focuses on the assessment of the preliminary safety report. The second stage makes it possible to issue the fuel loading approval following evaluation of the provisional safety report. The third stage permits to declare the start of normal operation of the installation. The procedure, the tests and the assessment forming the overall strategy for safety regulations are described in detail. (R.P.).

  17. Plasticity of gene-regulatory networks controlling sex determination: of masters, slaves, usual suspects, newcomers, and usurpators.

    Science.gov (United States)

    Herpin, Amaury; Schartl, Manfred

    2015-10-01

    Sexual dimorphism is one of the most pervasive and diverse features of animal morphology, physiology, and behavior. Despite the generality of the phenomenon itself, the mechanisms controlling how sex is determined differ considerably among various organismic groups, have evolved repeatedly and independently, and the underlying molecular pathways can change quickly during evolution. Even within closely related groups of organisms for which the development of gonads on the morphological, histological, and cell biological level is undistinguishable, the molecular control and the regulation of the factors involved in sex determination and gonad differentiation can be substantially different. The biological meaning of the high molecular plasticity of an otherwise common developmental program is unknown. While comparative studies suggest that the downstream effectors of sex-determining pathways tend to be more stable than the triggering mechanisms at the top, it is still unclear how conserved the downstream networks are and how all components work together. After many years of stasis, when the molecular basis of sex determination was amenable only in the few classical model organisms (fly, worm, mouse), recently, sex-determining genes from several animal species have been identified and new studies have elucidated some novel regulatory interactions and biological functions of the downstream network, particularly in vertebrates. These data have considerably changed our classical perception of a simple linear developmental cascade that makes the decision for the embryo to develop as male or female, and how it evolves. © 2015 The Authors.

  18. Regulatory activities

    International Nuclear Information System (INIS)

    2001-01-01

    This publication, compiled in 8 chapters, presents the regulatory system developed by the Nuclear Regulatory Authority (NRA) of the Argentine Republic. The following activities and developed topics in this document describe: the evolution of the nuclear regulatory activity in Argentina; the Argentine regulatory system; the nuclear regulatory laws and standards; the inspection and safeguards of nuclear facilities; the emergency systems; the environmental systems; the environmental monitoring; the analysis laboratories on physical and biological dosimetry, prenatal irradiation, internal irradiation, radiation measurements, detection techniques on nuclear testing, medical program on radiation protection; the institutional relations with national and international organization; the training courses and meeting; the technical information

  19. Experience Transformed into Nuclear Regulatory Improvements in Russia

    International Nuclear Information System (INIS)

    Sapozhnikov, A.

    2016-01-01

    The third International Conference on Effective Nuclear Regulatory Systems (Canada, 2013) identified the main action items that should be addressed, implemented and followed up. The key technical and organizational areas important to strengthening reactor and spent fuel safety have been determined as following: • Regulatory lessons learned and actions taken (since the accident at the Fukushima Daiichi NPP); • Waste management and spent fuel safety; • Emergency management; • Emerging programmes; • Human and organizational factors, safety and security culture. Over time many activities based on results of the IAEA Integrated Regulatory Review Service in the Russian Federation, 2019, and post-mission, 2013, have been implemented. At present there is progress for the national action plan on nuclear safety, preparation and conducting of long term spent fuel management, complementary reviews for nuclear facilities other than Nuclear Power Plants, emergency exercises with the regulatory body participation, improving communication, development of national regulations and improvement of regulatory system in the whole. The regulatory body ensures assistance in development of national regulatory infrastructure, safety culture to the countries planning to construct Russian design facilities (NPPs, RRs). The report outlines the results and future actions to improve nuclear regulation based on systematic approach to safety and particularly reflects the specificity of taking measures for the research reactors. (author)

  20. A unified architecture of transcriptional regulatory elements

    DEFF Research Database (Denmark)

    Andersson, Robin; Sandelin, Albin Gustav; Danko, Charles G.

    2015-01-01

    Gene expression is precisely controlled in time and space through the integration of signals that act at gene promoters and gene-distal enhancers. Classically, promoters and enhancers are considered separate classes of regulatory elements, often distinguished by histone modifications. However...... and enhancers are considered a single class of functional element, with a unified architecture for transcription initiation. The context of interacting regulatory elements and the surrounding sequences determine local transcriptional output as well as the enhancer and promoter activities of individual elements....

  1. 78 FR 49149 - Endangered and Threatened Wildlife and Plants; Determination of Endangered Status for Sphaeralcea...

    Science.gov (United States)

    2013-08-13

    ... collected to reestablish pre-mining population numbers in reclaimed areas. Furthermore, preliminary data... educational purposes; (C) disease or predation; (D) the inadequacy of existing regulatory mechanisms; or (E..., modification, and degradation resulting from gypsum mining operations; livestock grazing; the spread of...

  2. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  3. On the Concept of Cis-regulatory Information: From Sequence Motifs to Logic Functions

    Science.gov (United States)

    Tarpine, Ryan; Istrail, Sorin

    The regulatory genome is about the “system level organization of the core genomic regulatory apparatus, and how this is the locus of causality underlying the twin phenomena of animal development and animal evolution” (E.H. Davidson. The Regulatory Genome: Gene Regulatory Networks in Development and Evolution, Academic Press, 2006). Information processing in the regulatory genome is done through regulatory states, defined as sets of transcription factors (sequence-specific DNA binding proteins which determine gene expression) that are expressed and active at the same time. The core information processing machinery consists of modular DNA sequence elements, called cis-modules, that interact with transcription factors. The cis-modules “read” the information contained in the regulatory state of the cell through transcription factor binding, “process” it, and directly or indirectly communicate with the basal transcription apparatus to determine gene expression. This endowment of each gene with the information-receiving capacity through their cis-regulatory modules is essential for the response to every possible regulatory state to which it might be exposed during all phases of the life cycle and in all cell types. We present here a set of challenges addressed by our CYRENE research project aimed at studying the cis-regulatory code of the regulatory genome. The CYRENE Project is devoted to (1) the construction of a database, the cis-Lexicon, containing comprehensive information across species about experimentally validated cis-regulatory modules; and (2) the software development of a next-generation genome browser, the cis-Browser, specialized for the regulatory genome. The presentation is anchored on three main computational challenges: the Gene Naming Problem, the Consensus Sequence Bottleneck Problem, and the Logic Function Inference Problem.

  4. Politically Induced Regulatory Risk and Independent Regulatory Agencies

    OpenAIRE

    Strausz, Roland

    2015-01-01

    Uncertainty in election outcomes generates politically induced regulatory risk. Political parties' risk attitudes towards such risk depend on a fluctuation effect that hurts both parties and an output--expansion effect that benefits at least one party. Notwithstanding the parties' risk attitudes, political parties have incentives to negotiate away all regulatory risk by pre-electoral bargaining. Efficient pre-electoral bargaining outcomes fully eliminate politically induced regulatory risk. P...

  5. Scientific underpinnings of biotechnology regulatory frameworks.

    Science.gov (United States)

    Gleim, Savannah; Smyth, Stuart J

    2018-05-25

    Part of what is presently missing at domestic regulatory levels (and that is important at the international level as well) is a detailed understanding of what the rules of, and for, regulation should be, who the actors, stakeholders and major decision makers are and finally, how to get agreement about the rules. Greater insights into the system of rules that underpin regulatory frameworks for agri-food and biotechnology products in genetically modified (GM) crop- adopting nations will provide value by clarifying the evidence used to commercialize these technologies. This article examines the public documents available from Canada, the United States, the European Union and the Organisation for Economic Cooperation and Development regarding the development of regulatory risk assessment frameworks for products of biotechnology to determine what science grounds these frameworks. The documentation used to provide the initial structure to the existing regulatory frameworks identifies the linkages, connections and relationships that exist between science, risk assessment and regulatory policy. The relationship between risk and regulation has never been more critical to the commercialization of innovative agricultural products. Documenting the role of science-based risk assessment in regulations and how this has changed over the 20 years of experience in regulating GM crops will identify changes in the risk/regulation relationship. Crown Copyright © 2018. Published by Elsevier B.V. All rights reserved.

  6. [Sporulation or competence development? A genetic regulatory network model of cell-fate determination in Bacillus subtilis].

    Science.gov (United States)

    Lu, Zhenghui; Zhou, Yuling; Zhang, Xiaozhou; Zhang, Guimin

    2015-11-01

    Bacillus subtilis is a generally recognized as safe (GRAS) strain that has been widely used in industries including fodder, food, and biological control. In addition, B. subtilis expression system also plays a significant role in the production of industrial enzymes. However, its application is limited by its low sporulation frequency and transformation efficiency. Immense studies have been done on interpreting the molecular mechanisms of sporulation and competence development, whereas only few of them were focused on improving sporulation frequency and transformation efficiency of B. subtilis by genetic modification. The main challenge is that sporulation and competence development, as the two major developmental events in the stationary phase of B. subtilis, are regulated by the complicated intracellular genetic regulatory systems. In addition, mutual regulatory mechanisms also exist in these two developmental events. With the development of genetic and metabolic engineering, constructing genetic regulatory networks is currently one of the most attractive research fields, together with the genetic information of cell growth, metabolism, and development, to guide the industrial application. In this review, the mechanisms of sporulation and competence development of B. subtilis, their interactions, and the genetic regulation of cell growth were interpreted. In addition, the roles of these regulatory networks in guiding basic and applied research of B. subtilis and its related species were discussed.

  7. Evolution in performance assessment modeling as a result of regulatory review

    Energy Technology Data Exchange (ETDEWEB)

    Rowat, J.H.; Dolinar, G.M.; Stephens, M.E. [AECL Chalk River Labs., Ontario (Canada)] [and others

    1995-12-31

    AECL is planning to build the IRUS (Intrusion Resistant Underground Structure) facility for near-surface disposal of LLRW. The PSAR (preliminary safety assessment report) was subject to an initial regulatory review during mid-1992. The regulatory authority provided comments on many aspects of the safety assessment documentation including a number of questions on specific PA (Performance Assessment) modelling assumptions. As a result of these comments as well as a separate detailed review of the IRUS disposal concept, changes were made to the conceptual and mathematical models. The original disposal concept included a non-sorbing vault backfill, with a strong reliance on the wasteform as a barrier. This concept was altered to decrease reliance on the wasteform by replacing the original backfill with a sand/clinoptilolite mix, which is a better sorber of metal cations. This change lead to changes in the PA models which in turn altered the safety case for the facility. This, and other changes that impacted performance assessment modelling are the subject of this paper.

  8. In silico analysis of cis-acting regulatory elements in 5' regulatory regions of sucrose transporter gene families in rice (Oryza sativa Japonica) and Arabidopsis thaliana.

    Science.gov (United States)

    Ibraheem, Omodele; Botha, Christiaan E J; Bradley, Graeme

    2010-12-01

    The regulation of gene expression involves a multifarious regulatory system. Each gene contains a unique combination of cis-acting regulatory sequence elements in the 5' regulatory region that determines its temporal and spatial expression. Cis-acting regulatory elements are essential transcriptional gene regulatory units; they control many biological processes and stress responses. Thus a full understanding of the transcriptional gene regulation system will depend on successful functional analyses of cis-acting elements. Cis-acting regulatory elements present within the 5' regulatory region of the sucrose transporter gene families in rice (Oryza sativa Japonica cultivar-group) and Arabidopsis thaliana, were identified using a bioinformatics approach. The possible cis-acting regulatory elements were predicted by scanning 1.5kbp of 5' regulatory regions of the sucrose transporter genes translational start sites, using Plant CARE, PLACE and Genomatix Matinspector professional databases. Several cis-acting regulatory elements that are associated with plant development, plant hormonal regulation and stress response were identified, and were present in varying frequencies within the 1.5kbp of 5' regulatory region, among which are; A-box, RY, CAT, Pyrimidine-box, Sucrose-box, ABRE, ARF, ERE, GARE, Me-JA, ARE, DRE, GA-motif, GATA, GT-1, MYC, MYB, W-box, and I-box. This result reveals the probable cis-acting regulatory elements that possibly are involved in the expression and regulation of sucrose transporter gene families in rice and Arabidopsis thaliana during cellular development or environmental stress conditions. Copyright © 2010 Elsevier Ltd. All rights reserved.

  9. The preliminary planning for decommissioning nuclear facilities in Taiwan

    International Nuclear Information System (INIS)

    Li, K.K.

    1993-01-01

    During the congressional hearing in 1992 for a $7 billion project for approval of the fourth nuclear power plant, the public was concerned about the decommissioning of the operating plants. In order to facilitate the public acceptance of nuclear energy and to secure the local capability for appropriate nuclear backend management, both technologically and financially, it is important to have preliminary planning for decommissioning the nuclear facilities. This paper attempted to investigate the possible scope of decommissioning activities and addressed the important regulatory, financial, and technological aspects. More research and development works regarding the issue of decommissioning are needed to carry out the government's will of decent management of nuclear energy from the cradle to the grave

  10. 75 FR 75678 - Determination of Regulatory Review Period for Purposes of Patent Extension; STELARA

    Science.gov (United States)

    2010-12-06

    ..., animal drug product, medical device, food additive, or color additive) was subject to regulatory review... or systemic therapy. Subsequent to this approval, the Patent and Trademark Office received a patent...

  11. IAEA Mission Concludes Peer Review of Slovenia's Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    Senior international nuclear safety and radiation protection experts today concluded an eight-day International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety at the Slovenian Nuclear Safety Administration (SNSA). The team reviewed measures taken to address the recommendations and suggestions made during an earlier Integrated Regulatory Review Service (IRRS) mission conducted in 2011. The IRRS team said in its preliminary findings that Slovenia had made significant progress since the review in 2011. The team identified a good practice in the country's nuclear regulatory system additional to those identified in 2011 and made new recommendations and suggestions to SNSA and the Government to strengthen the effectiveness of the country's regulatory framework in line with IAEA Safety Standards. ''By hosting a follow-up mission, Slovenia demonstrated its commitment to enhance its regulatory programmes, including by implementing the recommendations of the 2011 mission,'' said Petr Krs, mission leader and Vice Chairman of the Czech Republic's State Office for Nuclear Safety. SNSA's Director, Andrej Stritar, welcomed the progress noted by the team, while also emphasizing that the mission highlighted important future nuclear safety challenges for Slovenia. The five-member review team, comprising experts from Belgium, the Czech Republic, France and Romania, as well as four IAEA staff members, conducted the mission at the request of the Slovenian Government from 9 to 16 September 2014. The main observations of the IRRS Review team included the following: SNSA has made significant progress in addressing the findings of the 2011 IRRS mission and has demonstrated commitment to effective implementation of the IRRS programme; The economic situation in Slovenia might in the short and long term affect SNSA's ability to maintain its capacity and competence; and A radioactive waste disposal project is stalled and the licensing

  12. Determinants to dose reduction in EMCCR - in regulatory perspective

    International Nuclear Information System (INIS)

    Mohan, V.; Venkataraman, S.; Venkataraman, R.; Sajeev, B.S.

    2006-01-01

    Indian PHWRs had experienced three en masse coolant channel replacement campaigns, (EMCCR) first in RAPS-2, next in MAPS-2 and the last in MAPS-1. The campaign is already in full swing at NAPS-1. At MAPS, two EMCCR campaigns were done in a span of four years. The collective dose consumption in the MAPS-1 campaign was only about 25 % that of MAPS-2, a commendable achievement. Based on the experience of RAPS-2 and MAPS-2 campaigns, AERB - through several regulatory means- had given directives for reduction in collective dose in MAPS-1 campaign which was successfully implemented. This paper analyses and quantifies the key factors that contributed to collective dose reduction in MAPS-1 EMCCR. These factors could be put to use in the on going NAPS and forthcoming KAPS campaigns. (author)

  13. Preliminary test results from the HSST shallow-crack fracture toughness program

    International Nuclear Information System (INIS)

    Theiss, T.J.; Robinson, G.C.; Rolfe, S.T.

    1991-01-01

    The Heavy Section Steel Technology (HSST) Program under sponsorship of the Nuclear Regulatory Commission (NRC) is investigating the influence of crack depth on the fracture toughness of reactor pressure vessel steel. The ultimate goal of the investigation is the generation of a limited data base of elastic-plastic fracture toughness values appropriate for shallow flaws in a reactor pressure vessel and the application of this data to reactor vessel life assessments. It has been shown that shallow-flaws play a dominant role in the probabilistic fracture mechanics analysis of reactor pressure vessels during a pressurized-thermal-shock event. In addition, recent research has shown that the crack initiation toughness measured using specimens with shallow flaws is greater that the toughness determined with conventional, deeply notched specimens at temperatures within the transition region for non-nuclear steels. The influence of crack depth on the elastic-plastic fracture toughness for prototypic reactor material is being investigated. Preliminary results indicate a significant increase in the toughness associated with shallow-flaws which has the potential to significantly impact the conditional probability of vessel failure. 8 refs., 4 figs., 1 tab

  14. Conserved regulatory modules in the Sox9 testis-specific enhancer predict roles for SOX, TCF/LEF, Forkhead, DMRT, and GATA proteins in vertebrate sex determination.

    Science.gov (United States)

    Bagheri-Fam, Stefan; Sinclair, Andrew H; Koopman, Peter; Harley, Vincent R

    2010-03-01

    While the primary sex determining switch varies between vertebrate species, a key downstream event in testicular development, namely the male-specific up-regulation of Sox9, is conserved. To date, only two sex determining switch genes have been identified, Sry in mammals and the Dmrt1-related gene Dmy (Dmrt1bY) in the medaka fish Oryzias latipes. In mice, Sox9 expression is evidently up-regulated by SRY and maintained by SOX9 both of which directly activate the core 1.3 kb testis-specific enhancer of Sox9 (TESCO). How Sox9 expression is up-regulated and maintained in species without Sry (i.e. non-mammalian species) is not understood. In this study, we have undertaken an in-depth comparative genomics approach and show that TESCO contains an evolutionarily conserved region (ECR) of 180 bp which is present in marsupials, monotremes, birds, reptiles and amphibians. The ECR contains highly conserved modules that predict regulatory roles for SOX, TCF/LEF, Forkhead, DMRT, and GATA proteins in vertebrate sex determination/differentiation. Our data suggest that tetrapods share common aspects of Sox9 regulation in the testis, despite having different sex determining switch mechanisms. They also suggest that Sox9 autoregulation is an ancient mechanism shared by all tetrapods, raising the possibility that in mammals, SRY evolved by mimicking this regulation. The validation of ECR regulatory sequences conserved from human to frogs will provide new insights into vertebrate sex determination. Copyright 2009 Elsevier Ltd. All rights reserved.

  15. 76 FR 14671 - Determination of Regulatory Review Period for Purposes of Patent Extension; ISTODAX

    Science.gov (United States)

    2011-03-17

    ..., medical device, food additive, or color additive) was subject to regulatory review by FDA before the item... in patients who have received at least one prior systemic therapy. Subsequent [[Page 14672

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Illinois. Preliminary background report

    Energy Technology Data Exchange (ETDEWEB)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Illinois Commerce Commission, comprised of five members appointed by the governor with the advice and consent of the senate and appointed for five year terms. They must be free from any employment or pecuniary interests in any business subject to regulation by the Commission. Local governments may exercise a large degree of regulatory authority over public utilities providing services within a municipality. The question of whether a municipality will exercise regulatory control over local public utilities must be put to the voters of the city. If the proposition is approved by a majority of the voters, the municipality may regulate services and rates and exercise most of the regulatory functions otherwise assigned to the Commission. If any public utility is dissatisfied with any action of a municipality, the utility is entitled to apply to the Commission for review of the action. On review, the Commission may take any determination which it deems just and reasonable. In addition, municipally-owned utilities are excluded specifically from the definition of public utility. These utilities are not within the jurisdiction of the Commission and are regulated locally. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Even Giants Need A Club: Domestic Institutions, Market Size, And Regulatory Influence

    OpenAIRE

    DAVID BACH

    2005-01-01

    This paper show that work on international market regulation has paid insufficient attention to the critical role played by domestic political and regulatory institutions. Existing literature emphasizes the role of market power, determined by market size, in analyzing international regulatory influence. While we do not contest the importance of market power, we introduce the notion of domestic regulatory capacity to capture the domestic institutional side of international market regulation th...

  18. 77 FR 26290 - Determination of Regulatory Review Period for Purposes of Patent Extension; KRYSTEXXA

    Science.gov (United States)

    2012-05-03

    ..., medical device, food additive, or color additive) was subject to regulatory review by FDA before the item... chronic gout in adult patients refractory to conventional therapy. Subsequent to this approval, the Patent...

  19. Preliminary determination of the energy potential of ocean currents along the southern coast of Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Andrea; Beluco, Alexandre; de Almeida, Luiz Emilio B. [Inst. Pesquisas Hidraulicas, Univ. Fed Rio Grande do Sul, Porto Alegre (Brazil)

    2013-07-01

    The ocean can be a strategic alternative for obtaining energy supplies, both from ocean waves as from sea currents and tides. Among these features, the power generation projects based on ocean currents are still under development. Generating energy from ocean can have great impact on the Brazilian energy grid, since Brazil has a vast coastline, with more than 9,000 km long, with potential for generating energy from ocean currents not fully estimated. This article presents a preliminary determination of the energy potential for power generation from ocean currents along the coast of Rio Grande do Sul, the southernmost state of Brazil, and also presents notes that contribute to the characterization of the system of ocean currents in the region. The data used were obtained in two areas near Tramandai, allowing the determination of velocities and directions of the currents on a seasonal basis. The maximum speeds obtained rarely exceed 0.750 m/s, while the average speeds do not exceed 0.200 m/s. A relationship with the prevailing winds in the region was identified. Unfortunately, the results do not allow optimism about the power generation from ocean currents on the southern coast of Brazil, at least over the continental shelf.

  20. 75 FR 76741 - Determination of Regulatory Review Period for Purposes of Patent Extension; SABRIL

    Science.gov (United States)

    2010-12-09

    ..., medical device, food additive, or color additive) was subject to regulatory review by FDA before the item... adults. It should be used as adjunctive therapy in patients who have responded inadequately to several...

  1. Strengthening Regulatory Competence in a Changing Nuclear Regulatory Environment

    International Nuclear Information System (INIS)

    Illizastigui, P.F.

    2016-01-01

    The paper addresses the approach followed by the Cuban National Center for Nuclear Safety for the management of current and new competences of its regulatory staff with the aim of allowing those staff to effectively fulfill their core regulatory functions. The approach is realized through an Integrated System for Competence Building, which is based on the IAEA recommendations, shown to be effective in ensuring the necessary competence in the relevant areas. In the author’s opinion, competence of the regulatory staff in the area of human and organizational factors is of paramount importance and needs to be further strengthened in order to be able to assess safety performance at the facilities and detect early signs of deteriorating safety performance. The former is defined by the author as the core regulatory function “Analysis” which covers the entire spectrum of assessment tasks carried out by the regulatory staff to: a) detect declining safety performance, b) diagnose latent weaknesses (root causes) and c) make effective safety culture interventions. The author suggests that competence associated with the fulfillment of the analysis function is distinctly identified and dealt with separately in the current system of managing regulatory competence. (author)

  2. Proposed plan for regulatory supervision of PRR-1

    International Nuclear Information System (INIS)

    Garcia, Corazon M; Parami, Vangeline K.

    2000-05-01

    This study is intended to determine acceptable and reasonable criteria necessary to provide assurance of safety of the society in which the research reactor is to be operated in all stages of its lifetime. It is also deemed necessary to determine criteria for the establishment of a system of independent regulatory supervision to ensure compliance of PRR-1 with the established criteria for safety. The different criteria/standards concerning the radiological and nuclear safety of the PRR-1 during the stages of the design for repair/rehabilitation, commissioning, operation, and decommissioning were identified and enumerated. Recommendations were given on matters relating to regulatory supervision during stages of design and construction for repair/rehabilitation, commissioning, operation, and decommissioning of the PRR-1. (author)

  3. Determinants of Trade Credit: A Preliminary Analysis on Construction Sector

    Directory of Open Access Journals (Sweden)

    Nicoleta Barbuta-Misu

    2016-07-01

    Full Text Available This paper introduces a preliminary analysis of the correlations between trade credit and some selected measures of financial performance for a sample of 958 firms acting in the construction sector. The examined period covers 2004-2013. The sample derived from Amadeus database contains firms that have sold and bought on credit. Results showed that larger firms offered and used more credit than counterparties. Firms offered and used in same time credit, but not in same level. Firms with higher return on assets and profit margin used and offered less credit from suppliers, respectively to clients. Moreover, more liquid firms used less trade payables.

  4. Phenotypic stability and plasticity in GMP-derived cells as determined by their underlying regulatory network.

    Science.gov (United States)

    Ramírez, Carlos; Mendoza, Luis

    2018-04-01

    Blood cell formation has been recognized as a suitable system to study celular differentiation mainly because of its experimental accessibility, and because it shows characteristics such as hierarchical and gradual bifurcated patterns of commitment, which are present in several developmental processes. Although hematopoiesis has been extensively studied and there is a wealth of molecular and cellular data about it, it is not clear how the underlying molecular regulatory networks define or restrict cellular differentiation processes. Here, we infer the molecular regulatory network that controls the differentiation of a blood cell subpopulation derived from the granulocyte-monocyte precursor (GMP), comprising monocytes, neutrophils, eosinophils, basophils and mast cells. We integrate published qualitative experimental data into a model to describe temporal expression patterns observed in GMP-derived cells. The model is implemented as a Boolean network, and its dynamical behavior is studied. Steady states of the network can be clearly identified with the expression profiles of monocytes, mast cells, neutrophils, basophils, and eosinophils, under wild-type and mutant backgrounds. All scripts are publicly available at https://github.com/caramirezal/RegulatoryNetworkGMPModel. lmendoza@biomedicas.unam.mx. Supplementary data are available at Bioinformatics online.

  5. T-regulatory cells in chronic rejection versus stable grafts.

    Science.gov (United States)

    Al-Wedaie, Fatima; Farid, Eman; Tabbara, Khaled; El-Agroudy, Amgad E; Al-Ghareeb, Sumaya M

    2015-04-01

    Studying regulatory T cells in kidney allograft acceptance versus chronic rejection may help in the understanding of more mechanisms of immune tolerance and, in the future, may enable clinicians to induce immune tolerance and decrease the use of immunosuppressive drugs. The aim of the current study was to evaluate regulatory T cells in kidney transplant patients with stable graft versus transplant with biopsy-proven chronic rejection. The 3 groups that were studied included: kidney transplanted patients with no rejection episodes (n = 43); transplanted patients with biopsy-proven renal rejection (n = 27); and healthy age-matched nontransplanted individuals as controls (n = 42).The percentage of regulatory T cells (CD4+CD25+Foxp3+) in blood was determined by flow cytometry. The regulatory T cell percentage was significantly lower in chronic rejection patients than control or stable graft groups. No significant difference was observed in regulatory T cell percentage between the stable graft and control groups. In the stable graft group, patients on rapamycin had a significantly higher regulatory T cell percentage than patients on cyclosporine. No effect of donor type, infection, or duration after transplant was observed on regulatory T cell percentage. The results of the current study are consistent with previous studies addressing the function of regulatory T cells in inducing immunotolerance after kidney transplant. Considering the established role of regulatory T cells in graft maintenance and our observation of high regulatory T cell percentage in patients receiving rapamycin than cyclosporine, we recommend including rapamycin when possible in immunosuppressive protocols. The findings from the current study on the chronic rejection group support ongoing research of having treatment with regulatory T cells, which may constitute a novel, efficient antirejection therapy in the future.

  6. Regulatory networks, legal federalism, and multi-level regulatory systems

    OpenAIRE

    Kerber, Wolfgang; Wendel, Julia

    2016-01-01

    Transnational regulatory networks play important roles in multi-level regulatory regimes, as e.g, the European Union. In this paper we analyze the role of regulatory networks from the perspective of the economic theory of legal federalism. Often sophisticated intermediate institutional solutions between pure centralisation and pure decentralisation can help to solve complex tradeoff problems between the benefits and problems of centralised and decentralised solutions. Drawing upon the insight...

  7. Preliminary I&C Design for LORELEI

    International Nuclear Information System (INIS)

    Korotkin, S.; Kaufman, Y.; Guttmann, E. B.; Levy, S.; Amidan, D.; Gdalyho, B.; Cahana, T.; Ellenbogen, A.; Arad, M.; Weiss, Y.; Sasson, A.; Ferry, L.; Bourrelly, F.; Cohen, Y.

    2014-01-01

    This document summarizes the preliminary I&C design for LORELEI experiment The preliminary design deals with considerations regarding appropriate safety and service instrumentation. The determined closed loop control rules for temperature and position will be implemented in the detailed design. The Computer Aided Operator Decisions System (CAODS) will be used for prediction of hot spot temperature and thickness of oxidation layer using Baker-Just correlation. The proposed hybrid simulation system comprising of both virtual and real hardware will be in-cooperated for LORELEI verification. It will perform both integration cold tests for a partial hardware loop and virtual tests for the final I&C design

  8. Considerations about the impact of the Convention on Nuclear Safety on the regulatory action of the CNEN in Brazilian nuclear power plants

    International Nuclear Information System (INIS)

    Camargo, Claudio; Pontedeiro, Auro

    1995-01-01

    Preliminary discussion is conducted about the impact of the terms of the Convention on Nuclear safety, adopted by Diplomatic Conference in September 1994 in the International Atomic Energy Agency, on the regulatory action of Brazilian Nuclear Regulatory Body - CNEN. Following the Convention articles structure, the paper emphasizes technical aspects of the nuclear safety standards adopted in the licensing process of Brazilian Nuclear Power Plants. The recent experience in the issuance of Angra-1 NPP Permanent Operation Authorization is used to demonstrate that current safety standards in Brazil are in compliance with the international compromises and in agreement with what is expected by the so called Safety Culture. (author). 9 refs

  9. Using Inequality Measures to Incorporate Environmental Justice into Regulatory Analyses

    Science.gov (United States)

    Harper, Sam; Ruder, Eric; Roman, Henry A.; Geggel, Amelia; Nweke, Onyemaechi; Payne-Sturges, Devon; Levy, Jonathan I.

    2013-01-01

    Formally evaluating how specific policy measures influence environmental justice is challenging, especially in the context of regulatory analyses in which quantitative comparisons are the norm. However, there is a large literature on developing and applying quantitative measures of health inequality in other settings, and these measures may be applicable to environmental regulatory analyses. In this paper, we provide information to assist policy decision makers in determining the viability of using measures of health inequality in the context of environmental regulatory analyses. We conclude that quantification of the distribution of inequalities in health outcomes across social groups of concern, considering both within-group and between-group comparisons, would be consistent with both the structure of regulatory analysis and the core definition of environmental justice. Appropriate application of inequality indicators requires thorough characterization of the baseline distribution of exposures and risks, leveraging data generally available within regulatory analyses. Multiple inequality indicators may be applicable to regulatory analyses, and the choice among indicators should be based on explicit value judgments regarding the dimensions of environmental justice of greatest interest. PMID:23999551

  10. Preliminary results of statistical dynamic experiments on a heat exchanger

    International Nuclear Information System (INIS)

    Corran, E.R.; Cummins, J.D.

    1962-10-01

    The inherent noise signals present in a heat exchanger have been recorded and analysed in order to determine some of the statistical dynamic characteristics of the heat exchanger. These preliminary results show that the primary side temperature frequency response may be determined by analysing the inherent noise. The secondary side temperature frequency response and cross coupled temperature frequency responses between primary and secondary are poorly determined because of the presence of a non-stationary noise source in the secondary circuit of this heat exchanger. This may be overcome by correlating the dependent variables with an externally applied noise signal. Some preliminary experiments with an externally applied random telegraph type of signal are reported. (author)

  11. Safety culture as a matter of regulatory control and regulatory effectiveness

    International Nuclear Information System (INIS)

    Camargo, C.T.M.; Furieri, E.B.; Arrieta, L.A.I.; Almeida, C.U.C.

    2002-01-01

    More than 15 years have passed since the term 'safety culture' was introduced by the International Nuclear Safety Advisory Group (INSAG), and although the concept now is widely accepted, practical applications and characteristics have been disseminated mainly for nuclear power plant operating organizations. There is still a lack of international guidance on the use of safety culture as a regulatory matter and on the application of the concept within regulatory organizations. This work explores the meaning of safety culture in two different fields: as an element of safety management systems it shall be a matter of regulatory control; as a complementary tool for quality management it should be used to enhance regulatory effectiveness. Brazilian recent experience on regulating nuclear power reactors provide some examples on how the concept of safety culture may influence regulatory strategies and regulatory management. (author)

  12. Preliminary report on fire protection research program (July 6, 1977 test)

    International Nuclear Information System (INIS)

    Klamerus, L.J.

    1977-10-01

    This preliminary report describes a fire test performed at Sandia Laboratories on an array of cable trays filled with fire retardant (IEEE 383 qualified) electrical cable. The cable trays were arranged in an open-space horizontal configuration with the separation distances of Regulatory Guide 1.75 between those trays representing redundant safety divisions. Propane burners were used to produce a fully developed cable fire in one tray which then was allowed to interact with other trays. From this test it appears that it is possible for a fire to propagate across the vertical separation distance between safety divisions, if a fully developed cable fire is the initiating event

  13. Land-use conflicts in The Geysers-Calistoga KGRA: a preliminary study

    Energy Technology Data Exchange (ETDEWEB)

    O' Banion, K.; Hall, C.; Haven, K.

    1979-12-01

    This preliminary study of potential land use conflicts of geothermal development in The Geysers region, one component of the LLL/LBL socioeconomic program, focuses on Lake County because it has most of the undeveloped resource and the least regulatory capability. The land resource is characterized in terms of its ecological, hydrological, agricultural, and recreational value; intrinsic natural hazards; and the adequacy of roads and utility systems and each factor is depicted on a map. Then those factors are analyzed for potential conflicts with both geothermal and urban development and the conflicts displayed on respective maps. A brief review of laws and methods germane to geothermal land-use regulation is included.

  14. SELF-REGULATORY ABILITIES IN PROFESSIONAL ACTIVITY

    Directory of Open Access Journals (Sweden)

    G V Ozhiganova

    2016-12-01

    Full Text Available The self-regulation is considered by the author as a general ability of the person. The levels of self-regulation relating to any professional activity, and corresponding to these levels self-regulatory capacities are distinguished: 1 psychophysiological - the ability for self-regulation of emotional and psycho- physiological states; 2 socio-psychological - the ability for self-regulation in the process of social interaction; 3 psychological (the ability to regulate activities; the capacity for personal self-control;spiritual - the highest capacity for self-regulation due to the higher values and meanings of existence. Self-regulation at the highest spiritual level is considered in this research in connection with the actualization of higher self-regulatory capacities, leading to self-realization of the person including professional activity. Processes, levels, components of self-regulation, associated with different conditions of professional activities (for example, in extreme situations, as well as with different types of professions (teachers, sales managers, etc. are described. A particular attention is given to self- regulation in the teaching activities: levels, techniques of teachers’ self-regulatory skills are presented; the importance of teachers’ personal self-regulation is emphasized, because it determines self-development, self-improvement and self-fulfillment in their chosen profession, and is associated with the manifestation of higher self-regulatory capacities. It is noted that in the process of professional activities different levels and types of self-regulation are demanded. The self-regulation in professional activities is carried out due to various self-regulatory capabilities - from simple to complex, including the highest.

  15. International Expert Team Concludes IAEA Peer Review of Poland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: International safety experts last week concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Poland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that Poland's nuclear regulator, Panstwowa Agencja Atomistyki (PAA), has a clear commitment to safety, a high level of transparency, competent staff and leadership, and a good recognition of challenges ahead related to Poland's efforts to develop nuclear power. ''Poland's regulatory framework and the work of PAA give high confidence of strong radiation protection for the Polish people. Further, there has been significant progress in the development of Poland's regulatory framework in preparation for the challenge of regulating nuclear power,'' said team leader Robert Lewis, a senior executive in the US Nuclear Regulatory Commission. The mission was conducted at the request of the Government of Poland from 15-25 April. The team was made up of 11 regulatory experts from Belgium, the Czech Republic, Finland, France, the Republic of Korea, Slovakia, Slovenia, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as five IAEA staff members. The IRRS review team was very thorough in its review, and we welcome its advice on how to continue to improve our programmes to protect people and the environment , said Janusz Wlodarski, President of PAA. The team interviewed members of PAA and officials from various ministries, as well as key players in the Polish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. Among its main observations the IRRS review team identified the following good practices: Applying the considerable experience of PAA's senior management to regulatory issues; The introduction of changes to Poland's laws and regulations following broad public consultation at an early stage in

  16. Impact of regulatory science on global public health

    Directory of Open Access Journals (Sweden)

    Meghal Patel

    2012-07-01

    Full Text Available Regulatory science plays a vital role in protecting and promoting global public health by providing the scientific basis for ensuring that food and medical products are safe, properly labeled, and effective. Regulatory science research was first developed for the determination of product safety in the early part of the 20th Century, and continues to support innovation of the processes needed for regulatory policy decisions. Historically, public health laws and regulations were enacted following public health tragedies, and often the research tools and techniques required to execute these laws lagged behind the public health needs. Throughout history, similar public health problems relating to food and pharmaceutical products have occurred in countries around the world, and have usually led to the development of equivalent solutions. For example, most countries require a demonstration of pharmaceutical safety and efficacy prior to marketing these products using approaches that are similar to those initiated in the United States. The globalization of food and medical products has created a shift in regulatory compliance such that gaps in food and medical product safety can generate international problems. Improvements in regulatory research can advance the regulatory paradigm toward a more preventative, proactive framework. These improvements will advance at a greater pace with international collaboration by providing additional resources and new perspectives for approaching and anticipating public health problems. The following is a review of how past public health disasters have shaped the current regulatory landscape, and where innovation can facilitate the shift from reactive policies to proactive policies.

  17. Impact of regulatory science on global public health.

    Science.gov (United States)

    Patel, Meghal; Miller, Margaret Ann

    2012-07-01

    Regulatory science plays a vital role in protecting and promoting global public health by providing the scientific basis for ensuring that food and medical products are safe, properly labeled, and effective. Regulatory science research was first developed for the determination of product safety in the early part of the 20th Century, and continues to support innovation of the processes needed for regulatory policy decisions. Historically, public health laws and regulations were enacted following public health tragedies, and often the research tools and techniques required to execute these laws lagged behind the public health needs. Throughout history, similar public health problems relating to food and pharmaceutical products have occurred in countries around the world, and have usually led to the development of equivalent solutions. For example, most countries require a demonstration of pharmaceutical safety and efficacy prior to marketing these products using approaches that are similar to those initiated in the United States. The globalization of food and medical products has created a shift in regulatory compliance such that gaps in food and medical product safety can generate international problems. Improvements in regulatory research can advance the regulatory paradigm toward a more preventative, proactive framework. These improvements will advance at a greater pace with international collaboration by providing additional resources and new perspectives for approaching and anticipating public health problems. The following is a review of how past public health disasters have shaped the current regulatory landscape, and where innovation can facilitate the shift from reactive policies to proactive policies. Copyright © 2012. Published by Elsevier B.V.

  18. 76 FR 21932 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Granting...

    Science.gov (United States)

    2011-04-19

    ... statement therein, as follows: I. Introduction On February 4, 2011, the Financial Industry Regulatory...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Granting Approval of a... Financial Industry Regulatory Authority, Inc. (``FINRA'') to amend Rule 13806 of the Code of Arbitration...

  19. Regulatory inspection of nuclear facilities and enforcement by the regulatory body. Safety guide

    International Nuclear Information System (INIS)

    2002-01-01

    The purpose of this Safety Guide is to provide recommendations for regulatory bodies on the inspection of nuclear facilities, regulatory enforcement and related matters. The objective is to provide the regulatory body with a high level of confidence that operators have the processes in place to ensure compliance and that they do comply with legal requirements, including meeting the safety objectives and requirements of the regulatory body. However, in the event of non-compliance, the regulatory body should take appropriate enforcement action. This Safety Guide covers regulatory inspection and enforcement in relation to nuclear facilities such as: enrichment and fuel manufacturing plants; nuclear power plants; other reactors such as research reactors and critical assemblies; spent fuel reprocessing plants; and facilities for radioactive waste management, such as treatment, storage and disposal facilities. This Safety Guide also covers issues relating to the decommissioning of nuclear facilities, the closure of waste disposal facilities and site rehabilitation. Section 2 sets out the objectives of regulatory inspection and enforcement. Section 3 covers the management of regulatory inspections. Section 4 covers the performance of regulatory inspections, including internal guidance, planning and preparation, methods of inspection and reports of inspections. Section 5 deals with regulatory enforcement actions. Section 6 covers the assessment of regulatory inspections and enforcement activities. The Appendix provides further details on inspection areas for nuclear facilities

  20. Effects of Regulatory Self-Questioning on Secondary-Level Students' Problem-Solving Performance

    Science.gov (United States)

    Pate, Michael L.; Miller, Greg

    2011-01-01

    A randomized posttest-only control group experimental design was used to determine the effects of regulatory self-questioning on secondary-level career and technical education students' electrical circuit theory test scores. Students who participated in the self-questioning group were asked to answer a list of regulatory questions as they solved…

  1. Improving regulatory effectiveness in Federal/State siting actions. Need for power: determinants in the state decisionmaking processes. Final report

    International Nuclear Information System (INIS)

    Noble, J.B.; Hemphill, J.B.

    1978-03-01

    The Department of Energy's Nuclear Siting and Licensing Act of 1978 (S. 2775; H. R. 11704) proposes Federal/State coordination in need for facility decisionmaking for nuclear power stations. The present study examines the decisionmaking criteria used by forty-four States in making a determination of need for power/facility. Specific criteria are identified along with the number of States which make those criteria a primary or a secondary consideration in determining need for facility. Individual profiles of the studied States' decisionmaking criteria are provided. In addition, the study examines the different organizational and functional patterns found in the States' regulatory process to certificate power stations. The coordination or lack of coordination of the issuance of associated environmental permits required for power stations is outlined for each State. Information concerning States' rate treatment of expenses associated with the construction and operation of a power station is provided. The relationship between the need for power decisionmaking process and the ratemaking process is explored

  2. IAEA Mission Concludes Peer Review of Viet Nam's Radiation and Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2014-01-01

    Senior international nuclear safety and radiation protection experts today concluded a 10-day International Atomic Energy Agency (IAEA) mission to review how Viet Nam's regulatory framework for nuclear and radiation safety has incorporated recommendations and suggestions from an earlier review, conducted in 2009. The Integrated Regulatory Review Service (IRRS) follow-up mission, requested by the Viet Nam Agency for Radiation and Nuclear Safety (VARANS), also reviewed the development of the regulatory safety infrastructure to support Viet Nam's nuclear power programme. The eight-member team comprised senior regulatory experts from Canada, France, Pakistan, Slovenia, United Arab Emirates and the United States of America, as well as three IAEA staff members. The IRRS team said in its preliminary assessment that Viet Nam had made progress since 2009, but that some key recommendations still needed to be addressed. Particular strengths identified by the team included: The commitment of VARANS staff to develop legislation and regulations in the field of nuclear and radiation safety; VARANS' efforts to implement practices that are in line with IAEA Safety Standards and internationally recognized good practices; A willingness to receive feedback regarding the efforts to establish and implement a regulation programme; and Progress made in developing the regulatory framework to support the introduction of nuclear power. The team identified the following areas as high-priority steps to further strengthen radiation and nuclear safety in Viet Nam: The effective independence of the regulatory decision-making process needs to be urgently addressed; Additional resources are needed to regulate existing radiation facilities and activities, as well as the country's research reactor; Efforts to increase the capacity of VARANS to regulate the developing nuclear power programme should continue; The draft Master Plan for the Development of Nuclear Power Infrastructure should be finalized

  3. Predictive minimum description length principle approach to inferring gene regulatory networks.

    Science.gov (United States)

    Chaitankar, Vijender; Zhang, Chaoyang; Ghosh, Preetam; Gong, Ping; Perkins, Edward J; Deng, Youping

    2011-01-01

    Reverse engineering of gene regulatory networks using information theory models has received much attention due to its simplicity, low computational cost, and capability of inferring large networks. One of the major problems with information theory models is to determine the threshold that defines the regulatory relationships between genes. The minimum description length (MDL) principle has been implemented to overcome this problem. The description length of the MDL principle is the sum of model length and data encoding length. A user-specified fine tuning parameter is used as control mechanism between model and data encoding, but it is difficult to find the optimal parameter. In this work, we propose a new inference algorithm that incorporates mutual information (MI), conditional mutual information (CMI), and predictive minimum description length (PMDL) principle to infer gene regulatory networks from DNA microarray data. In this algorithm, the information theoretic quantities MI and CMI determine the regulatory relationships between genes and the PMDL principle method attempts to determine the best MI threshold without the need of a user-specified fine tuning parameter. The performance of the proposed algorithm is evaluated using both synthetic time series data sets and a biological time series data set (Saccharomyces cerevisiae). The results show that the proposed algorithm produced fewer false edges and significantly improved the precision when compared to existing MDL algorithm.

  4. Data Science and Political Economy: Application to Financial Regulatory Structure

    Directory of Open Access Journals (Sweden)

    Sharyn O'Halloran

    2016-11-01

    Full Text Available The development of computational data science techniques in natural language processing and machine learning algorithms to analyze large and complex textual information opens new avenues for studying the interaction between economics and politics. We apply these techniques to analyze the design of financial regulatory structure in the United States since 1950. The analysis focuses on the delegation of discretionary authority to regulatory agencies in promulgating, implementing, and enforcing financial sector laws and overseeing compliance with them. Combining traditional studies with the new machine learning approaches enables us to go beyond the limitations of both methods and offer a more precise interpretation of the determinants of financial regulatory structure.

  5. A study on the influence of the regulatory requirements of a nuclear facility during decommissioning activities

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hee Seong; Park, Seung Kook; Park, Kook Nam; Hong, Yun Jeong; Park, Jang Jin; Choi, Jong Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    The preliminary decommissioning plan should be written with various chapters such as a radiological characterization, a decommissioning strategy and methods, a design for decommissioning usability, a safety evaluation, decontamination and dismantling activities, radioactive waste management, an environmental effect evaluation, and fire protection. The process requirements of the decommissioning project and the technical requirements and technical criteria should comply with regulatory requirements when dismantling of a nuclear facility. The requirements related to safety in the dismantling of a nuclear facility refer to the IAEA safety serious. The present paper indicates that a decommissioning design and plan, dismantling activities, and a decommissioning project will be influenced by the decommissioning regulatory requirements when dismantling of a nuclear facility. We hereby paved the way to find the effect of the regulatory requirements on the decommissioning of a whole area from the decommissioning strategy to the radioactive waste treatment when dismantling a nuclear facility. The decommissioning requirements have a unique feature in terms of a horizontal relationship as well as a vertical relationship from the regulation requirements to the decommissioning technical requirements. The decommissioning requirements management will be conducted through research that can recognize a multiple relationship in the next stage.

  6. Relative risk analysis in regulating the use of radiation-emitting medical devices. A preliminary application

    Energy Technology Data Exchange (ETDEWEB)

    Jones, E.D.; Banks, W.W.; Altenbach, T.J.; Fischer, L.E. [Lawrence Livermore National Lab., CA (United States)

    1995-09-01

    This report describes a preliminary application of an analysis approach for assessing relative risks in the use of radiation- emitting medical devices. Results are presented on human-initiated actions and failure modes that are most likely to occur in the use of the Gamma Knife, a gamma irradiation therapy device. This effort represents an initial step in a US Nuclear Regulatory Commission (NRC) plan to evaluate the potential role of risk analysis in regulating the use of nuclear medical devices. For this preliminary application of risk assessment, the focus was to develop a basic process using existing techniques for identifying the most likely risk contributors and their relative importance. The approach taken developed relative risk rankings and profiles that incorporated the type and quality of data available and could present results in an easily understood form. This work was performed by the Lawrence Livermore National Laboratory for the NRC.

  7. Relative risk analysis in regulating the use of radiation-emitting medical devices. A preliminary application

    International Nuclear Information System (INIS)

    Jones, E.D.; Banks, W.W.; Altenbach, T.J.; Fischer, L.E.

    1995-09-01

    This report describes a preliminary application of an analysis approach for assessing relative risks in the use of radiation- emitting medical devices. Results are presented on human-initiated actions and failure modes that are most likely to occur in the use of the Gamma Knife, a gamma irradiation therapy device. This effort represents an initial step in a US Nuclear Regulatory Commission (NRC) plan to evaluate the potential role of risk analysis in regulating the use of nuclear medical devices. For this preliminary application of risk assessment, the focus was to develop a basic process using existing techniques for identifying the most likely risk contributors and their relative importance. The approach taken developed relative risk rankings and profiles that incorporated the type and quality of data available and could present results in an easily understood form. This work was performed by the Lawrence Livermore National Laboratory for the NRC

  8. Cloning, expression, purification, crystallization and preliminary X-ray diffraction analysis of the regulator AcrR from Escherichia coli

    International Nuclear Information System (INIS)

    Li, Ming; Qiu, Xi; Su, Chih-Chia; Long, Feng; Gu, Ruoyu; McDermott, Gerry; Yu, Edward W.

    2006-01-01

    The transcriptional regulator AcrR from Escherichia coli has been cloned, overexpressed, purified and crystallized and X-ray diffraction data have been collected to a resolution of 2.5 Å. This paper describes the cloning, expression, purification and preliminary X-ray data analysis of the AcrR regulatory protein. The Escherichia coli AcrR is a member of the TetR family of transcriptional regulators. It regulates the expression of the AcrAB multidrug transporter. Recombinant AcrR with a 6×His tag at the C-terminus was expressed in E. coli and purified by metal-affinity chromatography. The protein was crystallized using hanging-drop vapor diffusion. X-ray diffraction data were collected from cryocooled crystals at a synchrotron light source. The best crystal diffracted to 2.5 Å. The space group was determined to be P3 2 , with unit-cell parameters a = b = 46.61, c = 166.16 Å

  9. Criteria for safety-related nuclear plant operator actions: a preliminary assessment of available data

    International Nuclear Information System (INIS)

    Haas, P.M.; Bott, T.F.

    1980-01-01

    In the US, an effort has been underway for a number of years to develop a design standard to define when required manual operator action can be accepted as part of a nuclear plant design basis. Insufficient data are available to provide quantitative guidelines for the standard. To provide the necessary data base to support such standards and the necessary quantitative assessment of operator reliability, the US Nuclear Regulatory Commission is sponsoring a study at Oak National Laboratory to develop the data base. A preliminary assessment completed in April, 1979 concluded that sufficient data from US operating experience did not exist to provide an adequate data base. A program of research using full-scope nuclear plant simulators and results that are correlated to field data was suggested. That program was recently initiated. The approach, results and conclusions of the preliminary assessment are reviewed and the planned research program of simulator studies is summarised. (author)

  10. Office of Nuclear Regulatory Research summary of advanced reactors activities, June 4, 2001

    International Nuclear Information System (INIS)

    2001-01-01

    Pre-application interactions with potential licensee applicants will help NRC prepare for future submittals, through the development of the infrastructure necessary for licensing application reviews. RES has the lead for non-LWR advanced reactor pre-application initiatives and longer-range new technology initiatives. An advanced reactor group has been formed in REAHFB, and is currently performing a pre-application review of Exelon's Pebble Bed Modular Reactor. Recent industry requests for future pre application interaction include General Atomics' Gas Turbine-Modular Helium Reactor (GT-MHR) and Westinghouse International Reactor Innovative and Secure (IRIS) design. RES advanced reactors activities also include participation as an observer in DOE's Generation IV initiative. Pre-Application review objectives include the development of regulatory guidance, licensing approach, and technology-basis expectations for licensing advanced designs, including identifying significant technology, design, safety, licensing and policy issues that would need to be addressed in the licensing process. The presentation described the pre-application process for the Exelon PBMR. NRC first identifies additional information following topical meetings with Exelon, and Exelon formally documents and submits required topical Information. The staff then develops a preliminary assessment and drafts a response which is followed by stakeholder input and comments at a public workshop. Preliminary assessments are discussed with ACRS and ACNW, and Commission papers are written which provide staff positions and recommendations on proposed policy decisions. Some of the significant areas for the PBMR include: Process Issues, Legal and Financial Issues; Regulatory Framework; Fuel Performance and Qualification; Traditional Engineering Design (e.g, Nuclear, Thermal-Fluid, Materials); Fuel Cycle Safety Areas; PRA, SSC Safety Classification; PBMR Prototype Testing

  11. 76 FR 36927 - Determination of Regulatory Review Period for Purposes of Patent Extension; Fusilev, Levoleucovorin

    Science.gov (United States)

    2011-06-23

    ... drug product, medical device, food additive, or color additive) was subject to regulatory review by FDA... after high-dose methotrexate therapy in osteosarcoma and is also indicated to diminish the toxicity and...

  12. Identification and evaluation of areas of interest (AOIs): A screening tool for CERCLA preliminary assessments

    International Nuclear Information System (INIS)

    Autry, A.R.; Allen, K.L.; Smith, L.A.; Schumacher, J.; McDermott, M.

    1994-01-01

    A cost-effective alternative to the traditional Preliminary Assessment (PA) procedure is to identify and evaluate potential Areas of Interest (AOIs) that may become Comprehensive Environmental Response, Liability and Compensation Act of 1980 (CERCLA) sites prior to entry into Comprehensive Environmental Response, Liability Information System (CERCLIS) and the execution of a PA. AOIs would be identified by using much of the same methodology as would be used for site discovery in a CERCLA investigation, including aerial photograph review, reviews of building drawings, a limited review of historical records, and limited interviews and site visits. Once AOIs have been identified in this manner, decision criteria can be used to ascertain the regulatory status of the AOI and, based on regulatory guidance, whether the site should be considered for further investigation under CERCLA. This approach was used at Griffiss Air Force Base to identify 463 AOIs, where the primary problem was petroleum spills

  13. Preliminary analyses of AP600 using RELAP5

    International Nuclear Information System (INIS)

    Modro, S.M.; Beelman, R.J.; Fisher, J.E.

    1991-01-01

    This paper presents results of preliminary analyses of the proposed Westinghouse Electric Corporation AP600 design. AP600 is a two loop, 600 MW (e) pressurized water reactor (PWR) arranged in a two hot leg, four cold leg nuclear steam supply system (NSSS) configuration. In contrast to the present generation of PWRs it is equipped with passive emergency core coolant (ECC) systems. Also, the containment and the safety systems of the AP600 interact with the reactor coolant system and each other in a more integral fashion than present day PWRs. The containment in this design is the ultimate heat sink for removal of decay heat to the environment. Idaho National Engineering Laboratory (INEL) has studied applicability of the RELAP5 code to AP600 safety analysis and has developed a model of the AP600 for the Nuclear Regulatory Commission. The model incorporates integral modeling of the containment, NSSS and passive safety systems. Best available preliminary design data were used. Nodalization sensitivity studies were conducted to gain experience in modeling of systems and conditions which are beyond the applicability of previously established RELAP5 modeling guidelines or experience. Exploratory analyses were then undertaken to investigate AP600 system response during postulated accident conditions. Four small break LOCA calculations and two large break LOCA calculations were conducted

  14. Regulatory guidance document

    International Nuclear Information System (INIS)

    1994-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM's evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7

  15. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  16. Purification, crystallization and preliminary crystallographic analysis of the CBS pair of the human metal transporter CNNM4

    International Nuclear Information System (INIS)

    Gómez García, Inmaculada; Oyenarte, Iker; Martínez-Cruz, Luis Alfonso

    2011-01-01

    This work describes the purification and preliminary crystallographic analysis of the CBS-pair regulatory domain of the human ancient domain protein 4 (ACDP4), also known as CNNM4. This work describes the purification and preliminary crystallographic analysis of the CBS-pair regulatory domain of the human ancient domain protein 4 (ACDP4), also known as CNNM4. ACDP proteins represent the least-studied members of the eight different types of magnesium transporters that have been identified in mammals to date. In humans the ACDP family includes four members: CNNM1–4. CNNM1 acts as a cytosolic copper chaperone and has been associated with urofacial syndrome, whereas CNNM2 and CNNM4 have been identified as magnesium transporters. Interestingly, mutations in the CNNM4 gene have clinical consequences that are limited to retinal function and biomineralization and are considered to be the cause of Jalili syndrome, which consists of autosomal recessive cone-rod dystrophy and amelogenesis imperfecta. The truncated protein was overexpressed, purified and crystallized in the orthorhombic space group C222. The crystals diffracted X-rays to 3.6 Å resolution using synchrotron radiation. Matthews volume calculations suggested the presence of two molecules in the asymmetric unit, which were likely to correspond to a CBS module of the CBS pair of CNNM4

  17. 76 FR 15322 - Determination of Regulatory Review Period for Purposes of Patent Extension; VPRIV

    Science.gov (United States)

    2011-03-21

    ..., medical device, food additive, or color additive) was subject to regulatory review by FDA before the item... therapy for pediatric and adult patients with type 1 Gaucher Disease. Subsequent to this approval, the...,138,262) from Shire Human Genetic Therapies, Inc., and the Patent and Trademark Office requested FDA's...

  18. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  19. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ... Announcing Preliminary Permit Drawing . The Commission has received three preliminary permit applications... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\3\\ The priority established by this drawing will be used to determine...

  20. 75 FR 1437 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Order Approving a...

    Science.gov (United States)

    2010-01-11

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-61274; File No. SR-CBOE-2009-089] Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Order Approving a Proposed Rule... announce to members via Regulatory Circular any determination regarding the routing of market stock-option...

  1. Preliminary safety assessment study for the conceptual design of a repository in tuff at Yucca Mountain

    International Nuclear Information System (INIS)

    Jackson, J.L.; Gram, H.F.; Hong, K.J.; Ng, H.S.; Pendergrass, A.M.

    1984-12-01

    Preliminary estimates of the upper bounds on postulated worst-case radiological releases resulting from possible accidents during the operating period of a prospective repository in tuff at Yucca Mountain are presented. Possible disrupting events are screened to identify the accidents of greatest potential consequence. The radiological dose commitments for the general public and repository personnel are estimated for postulated releases caused by natural phenomena, man-made events, and operational accidents. All postulated worst-case releases result in doses to the public that are lower than the 0.5-rem, whole-body dose-per-accident limit set by the Nuclear Regulatory Commission (NRC) in 10 CFR 60. Doses to repository personnel are within the NRC's 5.0-rem/yr occupational exposure limit set in 10 CFR 20 for normal operations. Doses are within this limit for all accidents except the transportation accident and fire in a drift. A preliminary risk assessment has also been performed. Based on this preliminary safety study, the proposed site boundaries and design criteria routinely used in constructing nuclear facilities appear to be adequate to protect the safety of the general public during the operating phase of the repository

  2. 75 FR 63878 - Self-Regulatory Organizations; Self-Regulatory Organizations; Notice of Filing and Immediate...

    Science.gov (United States)

    2010-10-18

    ...-Regulatory Organizations; Self-Regulatory Organizations; Notice of Filing and Immediate Effectiveness of...(b)(1). \\2\\ 17 CFR 240.19b-4. I. Self-Regulatory Organization's Statement of the Terms of Substance... Public Reference Room. II. Self-Regulatory Organization's Statement of the Purpose of, and Statutory...

  3. Evolution of Cis-Regulatory Elements and Regulatory Networks in Duplicated Genes of Arabidopsis.

    Science.gov (United States)

    Arsovski, Andrej A; Pradinuk, Julian; Guo, Xu Qiu; Wang, Sishuo; Adams, Keith L

    2015-12-01

    Plant genomes contain large numbers of duplicated genes that contribute to the evolution of new functions. Following duplication, genes can exhibit divergence in their coding sequence and their expression patterns. Changes in the cis-regulatory element landscape can result in changes in gene expression patterns. High-throughput methods developed recently can identify potential cis-regulatory elements on a genome-wide scale. Here, we use a recent comprehensive data set of DNase I sequencing-identified cis-regulatory binding sites (footprints) at single-base-pair resolution to compare binding sites and network connectivity in duplicated gene pairs in Arabidopsis (Arabidopsis thaliana). We found that duplicated gene pairs vary greatly in their cis-regulatory element architecture, resulting in changes in regulatory network connectivity. Whole-genome duplicates (WGDs) have approximately twice as many footprints in their promoters left by potential regulatory proteins than do tandem duplicates (TDs). The WGDs have a greater average number of footprint differences between paralogs than TDs. The footprints, in turn, result in more regulatory network connections between WGDs and other genes, forming denser, more complex regulatory networks than shown by TDs. When comparing regulatory connections between duplicates, WGDs had more pairs in which the two genes are either partially or fully diverged in their network connections, but fewer genes with no network connections than the TDs. There is evidence of younger TDs and WGDs having fewer unique connections compared with older duplicates. This study provides insights into cis-regulatory element evolution and network divergence in duplicated genes. © 2015 American Society of Plant Biologists. All Rights Reserved.

  4. Competencies Setup for Nuclear Regulatory Staff in Thailand

    International Nuclear Information System (INIS)

    Pingish, Panupong; Siripirom, Lopchai; Nakkaew, Pongpan; Manuwong, Theerapatt; Wongsamarn, Vichian

    2010-01-01

    Competencies setup for regulatory bodies oversee a research reactor and nuclear power reactors in Thailand, concentrating on staff development in areas of review and assessment, inspection and enforcement, authorization, and development of regulations and guides. The regulatory body in Thailand is the Bureau of Nuclear Safety Regulation (BNSR) which belongs to the Office of Atoms for Peace (OAP). The BNSR is divided into 4 groups according to the International Atomic Energy Agency (IAEA). These groups are the nuclear safety administration group, nuclear safety technical support group, nuclear safety assessment and licensing group, and the nuclear installations inspection group. Each group is divided into senior and junior positions. The competencies model was used for implementation of staff qualification, career planning and professional progression by BNSR. Competencies are related to knowledge, skills and attitudes (KSAs) needed to perform their job. A key issue is obtaining competencies for the regulatory bodies. The systematic approach to training (SAT) has been used in several countries for improvement regulator performance. The SAT contains 5 steps, including analysis, design, development, implementation and evaluation, to achieve competencies. The SAT provides a logical progression from the identification of competencies required to perform a job to the design, development and implementation of training using the competencies model. In the first step, BNSR performs an operating analysis of training needs assessment (TNA) by using gap analysis technique, as suggested by IAEA. Individual regulatory bodies address the gap using appropriate training program, after comparing the actual and desired competency profiles to determine the gap. This paper examines competencies setup for regulatory staff of BNSR as a result of gaps analysis to establish a scheme for design characteristics of regulatory staff and training courses, thereby enhancing the regulatory

  5. Regulatory activities; Actividades regulatorias

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This publication, compiled in 8 chapters, presents the regulatory system developed by the Nuclear Regulatory Authority (NRA) of the Argentine Republic. The following activities and developed topics in this document describe: the evolution of the nuclear regulatory activity in Argentina; the Argentine regulatory system; the nuclear regulatory laws and standards; the inspection and safeguards of nuclear facilities; the emergency systems; the environmental systems; the environmental monitoring; the analysis laboratories on physical and biological dosimetry, prenatal irradiation, internal irradiation, radiation measurements, detection techniques on nuclear testing, medical program on radiation protection; the institutional relations with national and international organization; the training courses and meeting; the technical information.

  6. Crystallization of the glycogen-binding domain of the AMP-activated protein kinase β subunit and preliminary X-ray analysis

    Energy Technology Data Exchange (ETDEWEB)

    Polekhina, Galina, E-mail: gpolekhina@svi.edu.au; Feil, Susanne C.; Gupta, Abhilasha [St Vincent’s Institute of Medical Research, 9 Princes Street, Fitzroy, Victoria 3065 (Australia); O’Donnell, Paul [Department of Biochemistry and Molecular Biology, The University of Melbourne, Parkville 3010 (Australia); Stapleton, David; Parker, Michael W. [St Vincent’s Institute of Medical Research, 9 Princes Street, Fitzroy, Victoria 3065 (Australia)

    2005-01-01

    The glycogen-binding domain of the AMP-activated kinase β subunit has been crystallized in the presence of β-cyclodextrin. The structure has been determined by single isomorphous replacement and threefold averaging using in-house X-ray data collected from selenomethionine-substituted protein. AMP-activated protein kinase (AMPK) is an intracellular energy sensor that regulates metabolism in response to energy demand and supply by adjusting the ATP-generating and ATP-consuming pathways. AMPK potentially plays a critical role in diabetes and obesity as it is known to be activated by metforin and rosiglitazone, drugs used for the treatment of type II diabetes. AMPK is a heterotrimer composed of a catalytic α subunit and two regulatory subunits, β and γ. Mutations in the γ subunit are known to cause glycogen accumulation, leading to cardiac arrhythmias. Recently, a functional glycogen-binding domain (GBD) has been identified in the β subunit. Here, the crystallization of GBD in the presence of β-cyclodextrin is reported together with preliminary X-ray data analysis allowing the determination of the structure by single isomorphous replacement and threefold averaging using in-house X-ray data collected from a selenomethionine-substituted protein.

  7. Crystallization of the glycogen-binding domain of the AMP-activated protein kinase β subunit and preliminary X-ray analysis

    International Nuclear Information System (INIS)

    Polekhina, Galina; Feil, Susanne C.; Gupta, Abhilasha; O’Donnell, Paul; Stapleton, David; Parker, Michael W.

    2004-01-01

    The glycogen-binding domain of the AMP-activated kinase β subunit has been crystallized in the presence of β-cyclodextrin. The structure has been determined by single isomorphous replacement and threefold averaging using in-house X-ray data collected from selenomethionine-substituted protein. AMP-activated protein kinase (AMPK) is an intracellular energy sensor that regulates metabolism in response to energy demand and supply by adjusting the ATP-generating and ATP-consuming pathways. AMPK potentially plays a critical role in diabetes and obesity as it is known to be activated by metforin and rosiglitazone, drugs used for the treatment of type II diabetes. AMPK is a heterotrimer composed of a catalytic α subunit and two regulatory subunits, β and γ. Mutations in the γ subunit are known to cause glycogen accumulation, leading to cardiac arrhythmias. Recently, a functional glycogen-binding domain (GBD) has been identified in the β subunit. Here, the crystallization of GBD in the presence of β-cyclodextrin is reported together with preliminary X-ray data analysis allowing the determination of the structure by single isomorphous replacement and threefold averaging using in-house X-ray data collected from a selenomethionine-substituted protein

  8. Atomic Energy Control Board vocabulary - preliminary edition

    Energy Technology Data Exchange (ETDEWEB)

    Nolet, D [Public Works and Government Services Canada, Montreal, PQ (Canada). Terminology and Documentation Directorate

    1995-09-01

    This preliminary edition was prepared at the Board`s request to help it establish a standardized terminology. It was produced by scanning the 99 French and English documents listed at the end of this Vocabulary. The documents include legislation concerning atomic energy and the transportation of radioactive materials, as well as the Board`s publications, such as the Consultative Documents, Regulatory Documents and Notices. The terms included from the following areas are: radiation protection, reactor technology, nuclear fuel cycle, radioactive material packaging and transportation, radioactive waste management, uranium mines, and medical and industrial applications of radioelements. Also included are the titles of publications and the names of organizations and units. The vocabulary contains 2,589 concepts, sometimes accompanied by definitions, contexts or usage examples. Where terms have been standardized by the Canadian Committee for the Standardization of Nuclear Terminology, this has been indicated. Where possible, we have verified the terms using the TERMIUM, the Government of Canada Linguistic Data Bank. (author).

  9. Atomic Energy Control Board vocabulary - preliminary edition

    International Nuclear Information System (INIS)

    Nolet, D.

    1995-09-01

    This preliminary edition was prepared at the Board's request to help it establish a standardized terminology. It was produced by scanning the 99 French and English documents listed at the end of this Vocabulary. The documents include legislation concerning atomic energy and the transportation of radioactive materials, as well as the Board's publications, such as the Consultative Documents, Regulatory Documents and Notices. The terms included from the following areas are: radiation protection, reactor technology, nuclear fuel cycle, radioactive material packaging and transportation, radioactive waste management, uranium mines, and medical and industrial applications of radioelements. Also included are the titles of publications and the names of organizations and units. The vocabulary contains 2,589 concepts, sometimes accompanied by definitions, contexts or usage examples. Where terms have been standardized by the Canadian Committee for the Standardization of Nuclear Terminology, this has been indicated. Where possible, we have verified the terms using the TERMIUM, the Government of Canada Linguistic Data Bank. (author)

  10. 77 FR 26016 - Determination of Regulatory Review Period for Purposes of Patent Extension; Alair Bronchial...

    Science.gov (United States)

    2012-05-02

    ... approval phase starts with the initial submission of an application to market the device and continues until permission to market the device is granted. Although only a portion of a regulatory review period... asthma is not well controlled [[Page 26017

  11. Study of the main regulatory mechanisms to encourage renewable and alternative energy applied internationally and in Brazil; Estudo dos principais mecanismos regulatorios de incentivo as fontes renovaveis e alternativas de energia aplicados internacionalmente e no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Juliana M.C.; Cavaliero, Carla Kazue Nakao [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia], Emails: jumcm@fem.unicamp.br, cavaliero@fem.unicamp.br

    2009-07-01

    The investment in renewable and alternative energy sources has been stimulated by some countries in Europe and Americas through the introduction of encouragement regulatory mechanisms. This paper considers the most important international mechanisms such as Feed-in System, Tender System and Quota System with green certificates. In Brazil, there are three regulatory mechanisms in course: PROINFA, the 1. Tender of Renewable and 1. Tender Reserve. The carried out preliminary analysis made possible to classify PROINFA as a mechanism similar to Feed-in, while the auction of Renewable and Reserve are more like an auction system. This article points out the differences and similarities between the instruments and gives a preliminary analysis of their effectiveness, emphasizing national mechanisms, especially regarding the criteria for capacity increase and cost reduction of the technological bands, such as for biomass and small hydroelectric. (author)

  12. The core to regulatory reform

    International Nuclear Information System (INIS)

    Partridge, J.W. Jr.

    1993-01-01

    Federal Energy Regulatory Commission (FERC) Orders 436, 500, and 636, the Clean Air Act Amendments of 1990, Public Utility Holding Company Act reform, and the 1992 Energy Policy Act all can have significant effects on an LDC's operations. Such changes in an LDC's environments must be balanced by changes within the utility, its marketplace, and its state regulatory environment. The question is where to start. For Columbia Gas Distribution Cos., based in Columbus, OH, the new operating foundation begins with each employee. Internal strength is critical in designing initiatives that meet the needs of the marketplace and are well-received by regulators. Employees must understand not only the regulatory environment in which the LDC operates, but also how their work contributes to a positive regulatory relationship. To achieve this, Columbia initiated the COntinuing Regulatory Education program, or CORE, in 1991. CORE is a regulatory-focused, information-initiative program coordinated by Columbia's Regulatory Policy, Planning, and Government Affairs Department. The CORE programs can take many forms, such as emerging issue discussions, dialogues with regulators and key parties, updates on regulatory fillings, regulatory policy meetings, and formal training classes. The speakers and discussion facilitators can range from human resource department trainers to senior officers, from regulatory department staff members to external experts, or from state commissioners to executives from other LDCs. The goals of CORE initiatives are to: Support a professional level of regulatory expertise through employee participation in well-developed regulatory programs presented by credible experts. Encourage a constructive state regulatory environment founded on communication and cooperation. CORE achieves these goals via five program levels: introductory basics, advanced learning, professional expertise, crossfunctional dialogues, and external idea exchanges

  13. 76 FR 66344 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving...

    Science.gov (United States)

    2011-10-26

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving Proposed Rule Change... 31, 2011, Financial Industry Regulatory Authority, Inc. (``FINRA'') (f/k/a National Association of... consolidation process, see Information Notice, March 12, 2008 (Rulebook Consolidation Process). For convenience...

  14. 75 FR 17456 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving...

    Science.gov (United States)

    2010-04-06

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving Proposed Rule Change..., Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission... terms. For more information about the rulebook consolidation process, see Information Notice, March 12...

  15. Digital publication of EDF's regulatory files

    International Nuclear Information System (INIS)

    Picard, Pauline

    2012-06-01

    The Engineering Centre of Deconstruction and Environment wants to modernize the distribution of its regulatory filings in digital form. This project requires a prior upstream of its implementation to determine the best publishing solution suited to the constraints of diffusion and heritage protection of EDF

  16. Genome-wide identification of regulatory elements and reconstruction of gene regulatory networks of the green alga Chlamydomonas reinhardtii under carbon deprivation.

    Directory of Open Access Journals (Sweden)

    Flavia Vischi Winck

    Full Text Available The unicellular green alga Chlamydomonas reinhardtii is a long-established model organism for studies on photosynthesis and carbon metabolism-related physiology. Under conditions of air-level carbon dioxide concentration [CO2], a carbon concentrating mechanism (CCM is induced to facilitate cellular carbon uptake. CCM increases the availability of carbon dioxide at the site of cellular carbon fixation. To improve our understanding of the transcriptional control of the CCM, we employed FAIRE-seq (formaldehyde-assisted Isolation of Regulatory Elements, followed by deep sequencing to determine nucleosome-depleted chromatin regions of algal cells subjected to carbon deprivation. Our FAIRE data recapitulated the positions of known regulatory elements in the promoter of the periplasmic carbonic anhydrase (Cah1 gene, which is upregulated during CCM induction, and revealed new candidate regulatory elements at a genome-wide scale. In addition, time series expression patterns of 130 transcription factor (TF and transcription regulator (TR genes were obtained for cells cultured under photoautotrophic condition and subjected to a shift from high to low [CO2]. Groups of co-expressed genes were identified and a putative directed gene-regulatory network underlying the CCM was reconstructed from the gene expression data using the recently developed IOTA (inner composition alignment method. Among the candidate regulatory genes, two members of the MYB-related TF family, Lcr1 (Low-CO 2 response regulator 1 and Lcr2 (Low-CO2 response regulator 2, may play an important role in down-regulating the expression of a particular set of TF and TR genes in response to low [CO2]. The results obtained provide new insights into the transcriptional control of the CCM and revealed more than 60 new candidate regulatory genes. Deep sequencing of nucleosome-depleted genomic regions indicated the presence of new, previously unknown regulatory elements in the C. reinhardtii genome

  17. 78 FR 62784 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of...

    Science.gov (United States)

    2013-10-22

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Designation of a Longer... 5210 (Publication of Transactions and Quotations) October 4, 2013. I. Introduction On August 15, 2013, Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission...

  18. Determining Plutonium Mass in Spent Fuel with Nondestructive Assay Techniques -- Preliminary Modeling Results Emphasizing Integration among Techniques

    International Nuclear Information System (INIS)

    Tobin, S.J.; Fensin, M.L.; Ludewigt, B.A.; Menlove, H.O.; Quiter, B.J.; Sandoval, N.P.; Swinhoe, M.T.; Thompson, S.J.

    2009-01-01

    There are a variety of motivations for quantifying Pu in spent (used) fuel assemblies by means of nondestructive assay (NDA) including the following: strengthen the capabilities of the International Atomic Energy Agencies to safeguards nuclear facilities, quantifying shipper/receiver difference, determining the input accountability value at reprocessing facilities and providing quantitative input to burnup credit determination for repositories. For the purpose of determining the Pu mass in spent fuel assemblies, twelve NDA techniques were identified that provide information about the composition of an assembly. A key point motivating the present research path is the realization that none of these techniques, in isolation, is capable of both (1) quantifying the elemental Pu mass of an assembly and (2) detecting the diversion of a significant number of pins. As such, the focus of this work is determining how to best integrate 2 or 3 techniques into a system that can quantify elemental Pu and to assess how well this system can detect material diversion. Furthermore, it is important economically to down-select among the various techniques before advancing to the experimental phase. In order to achieve this dual goal of integration and down-selection, a Monte Carlo library of PWR assemblies was created and is described in another paper at Global 2009 (Fensin et al.). The research presented here emphasizes integration among techniques. An overview of a five year research plan starting in 2009 is given. Preliminary modeling results for the Monte Carlo assembly library are presented for 3 NDA techniques: Delayed Neutrons, Differential Die-Away, and Nuclear Resonance Fluorescence. As part of the focus on integration, the concept of 'Pu isotopic correlation' is discussed and the role of cooling time determination.

  19. 75 FR 21686 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2010-04-26

    ... to pay arbitration awards to remain in the securities industry presents regulatory risks and is...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of Proposed Rule... Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission (``SEC'' or...

  20. Sparsity in Model Gene Regulatory Networks

    International Nuclear Information System (INIS)

    Zagorski, M.

    2011-01-01

    We propose a gene regulatory network model which incorporates the microscopic interactions between genes and transcription factors. In particular the gene's expression level is determined by deterministic synchronous dynamics with contribution from excitatory interactions. We study the structure of networks that have a particular '' function '' and are subject to the natural selection pressure. The question of network robustness against point mutations is addressed, and we conclude that only a small part of connections defined as '' essential '' for cell's existence is fragile. Additionally, the obtained networks are sparse with narrow in-degree and broad out-degree, properties well known from experimental study of biological regulatory networks. Furthermore, during sampling procedure we observe that significantly different genotypes can emerge under mutation-selection balance. All the preceding features hold for the model parameters which lay in the experimentally relevant range. (author)

  1. 75 FR 5157 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving...

    Science.gov (United States)

    2010-02-01

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving Proposed Rule Change... Consolidated FINRA Rulebook January 25, 2010. On December 2, 2009, the Financial Industry Regulatory Authority... later in the rulebook consolidation process. It is therefore ordered, pursuant to Section 19(b)(2) of...

  2. 77 FR 47470 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of...

    Science.gov (United States)

    2012-08-08

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Withdrawal of Proposed Rule Change To Adopt FINRA Rule 2231 (Customer Account Statements) in the Consolidated FINRA Rulebook August 2, 2012. On April 22, 2009, the Financial Industry Regulatory Authority, Inc. (``FINRA'') (f/k/a...

  3. 76 FR 21084 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of...

    Science.gov (United States)

    2011-04-14

    ... Securities April 8, 2011. I. Introduction On March 3, 2011, the Financial Industry Regulatory Authority, Inc... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-64283; File No. SR-FINRA-2011-012] Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Designation of a Longer...

  4. Managing Regulatory Body Competence

    International Nuclear Information System (INIS)

    2013-01-01

    In 2001, the IAEA published TECDOC 1254, which examined the way in which the recognized functions of a regulatory body for nuclear facilities results in competence needs. Using the systematic approach to training (SAT), TECDOC 1254 provided a framework for regulatory bodies for managing training and developing and their maintaining their competence. It has been successfully used by many regulators. The IAEA has also introduced a methodology and an assessment tool - Guidelines for Systematic Assessment of Regulatory Competence Needs (SARCoN) - which provides practical guidance on analysing the training and development needs of a regulatory body and, through a gap analysis, guidance on establishing competence needs and how to meet them. In 2009, the IAEA established a steering committee (supported by a bureau) with the mission to advise the IAEA on how it could best assist Member States to develop suitable competence management systems for their regulatory bodies. The committee recommended the development of a safety report on managing staff competence as an integral part of a regulatory body's management system. This Safety Report was developed in response to this request. It supersedes TECDOC 1254, broadens its application to regulatory bodies for all facilities and activities, and builds upon the experience gained through the application of TECDOC 1254 and SARCoN and the feedback received from Member States. This Safety Report applies to the management of adequate competence as needs change, and as such is equally applicable to the needs of States 'embarking' on a nuclear power programme. It also deals with the special case of building up the competence of regulatory bodies as part of the overall process of establishing an 'embarking' State's regulatory system

  5. Croatian energy regulatory council - independent Croatian regulatory body

    International Nuclear Information System (INIS)

    Klepo, M.

    2002-01-01

    By means of approving five energy laws, the Republic of Croatia established an appropriate legislative framework for energy sector regulation. A series of sub-law acts is presently being elaborated as well as some additional documents in order to bring about transparent and non-discriminatory provisions for the establishment of electric energy, gas, oil/oil derivatives and thermal energy markets, i.e. for the introduction and management of market activities and public services. A considerable share of these activities relates to the definition of transparent regulatory mechanisms that would guarantee the implementation of regulation rules based on the law, and be carried out by the independent regulatory body - Croatian Energy Regulatory Council. The Council's rights and obligations include firm executive functions, which present obligations to every energy entity. A dissatisfied party may set in motion a settlement of dispute, if it maintains that the decisions are not based on the law or reveal a flaw in the procedure. Therefore, it is the Council's priority to always make careful and law-abiding decisions. This paper gives insight into the regulatory framework elements based on the laws including the Council's organisational structure and non-profit entities that will prepare act proposals for the Council and perform other professional activities. (author)

  6. Regulatory relevant and reliable methods and data for determining the environmental fate of manufactured nanomaterials

    DEFF Research Database (Denmark)

    Baun, Anders; Sayre, Phil; Steinhäuser, Klaus Günter

    2017-01-01

    The widespread use of manufactured nanomaterials (MN) increases the need for describing and predicting their environmental fate and behaviour. A number of recent reviews have addressed the scientific challenges in disclosing the governing processes for the environmental fate and behaviour of MNs,...... data. Gaps do however exist in test methods for environmental fate, such as methods to estimate heteroagglomeration and the tendency for MNs to transform in the environment.......The widespread use of manufactured nanomaterials (MN) increases the need for describing and predicting their environmental fate and behaviour. A number of recent reviews have addressed the scientific challenges in disclosing the governing processes for the environmental fate and behaviour of MNs......, however there has been less focus on the regulatory adequacy of the data available for MN. The aim of this paper is therefore to review data, testing protocols and guidance papers which describe the environmental fate and behaviour of MN with a focus on their regulatory reliability and relevance. Given...

  7. Anti-regulatory T cells

    DEFF Research Database (Denmark)

    Andersen, Mads Hald

    2017-01-01

    responses to tumours or inhibiting autoimmunity development. However, recent studies report the discovery of self-reactive pro-inflammatory T cells—termed anti-regulatory T cells (anti-Tregs)—that target immune-suppressive cells. Thus, regulatory cells can now be defined as both cells that suppress immune...... reactions as well as effector cells that counteract the effects of suppressor cells and support immune reactions. Self-reactive anti-Tregs have been described that specifically recognize human leukocyte antigen-restricted epitopes derived from proteins that are normally expressed by regulatory immune cells......Our initial understanding of immune-regulatory cells was based on the discovery of suppressor cells that assure peripheral T-cell tolerance and promote immune homeostasis. Research has particularly focused on the importance of regulatory T cells (Tregs) for immune modulation, e.g. directing host...

  8. Development of thermal hydraulic models for the reliable regulatory auditing code

    Energy Technology Data Exchange (ETDEWEB)

    Chung, B. D.; Song, C. H.; Lee, Y. J.; Kwon, T. S.; Lee, S. W. [Korea Automic Energy Research Institute, Taejon (Korea, Republic of)

    2004-02-15

    The objective of this project is to develop thermal hydraulic models for use in improving the reliability of the regulatory auditing codes. The current year fall under the second step of the 3 year project, and the main researches were focused on the development of downcorner boiling model. During the current year, the bubble stream model of downcorner has been developed and installed in he auditing code. The model sensitivity analysis has been performed for APR1400 LBLOCA scenario using the modified code. The preliminary calculation has been performed for the experimental test facility using FLUENT and MARS code. The facility for air bubble experiment has been installed. The thermal hydraulic phenomena for VHTR and super critical reactor have been identified for the future application and model development.

  9. Development of thermal hydraulic models for the reliable regulatory auditing code

    Energy Technology Data Exchange (ETDEWEB)

    Chung, B. D.; Song, C. H.; Lee, Y. J.; Kwon, T. S. [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    2003-04-15

    The objective of this project is to develop thermal hydraulic models for use in improving the reliability of the regulatory auditing codes. The current year fall under the first step of the 3 year project, and the main researches were focused on identifying the candidate thermal hydraulic models for improvement and to develop prototypical model development. During the current year, the verification calculations submitted for the APR 1400 design certification have been reviewed, the experimental data from the MIDAS DVI experiment facility in KAERI have been analyzed and evaluated, candidate thermal hydraulic models for improvement have been identified, prototypical models for the improved thermal hydraulic models have been developed, items for experiment in connection with the model development have been identified, and preliminary design of the experiment has been carried out.

  10. Development of thermal hydraulic models for the reliable regulatory auditing code

    International Nuclear Information System (INIS)

    Chung, B. D.; Song, C. H.; Lee, Y. J.; Kwon, T. S.

    2003-04-01

    The objective of this project is to develop thermal hydraulic models for use in improving the reliability of the regulatory auditing codes. The current year fall under the first step of the 3 year project, and the main researches were focused on identifying the candidate thermal hydraulic models for improvement and to develop prototypical model development. During the current year, the verification calculations submitted for the APR 1400 design certification have been reviewed, the experimental data from the MIDAS DVI experiment facility in KAERI have been analyzed and evaluated, candidate thermal hydraulic models for improvement have been identified, prototypical models for the improved thermal hydraulic models have been developed, items for experiment in connection with the model development have been identified, and preliminary design of the experiment has been carried out

  11. Energy Efficient Engine: Control system preliminary definition report

    Science.gov (United States)

    Howe, David C.

    1986-01-01

    The object of the Control Preliminary Definition Program was to define a preliminary control system concept as a part of the Energy Efficient Engine program. The program was limited to a conceptual definition of a full authority digital electronic control system. System requirements were determined and a control system was conceptually defined to these requirements. Areas requiring technological development were identified and a plan was established for implementing the identified technological features, including a control technology demonstration. A significant element of this program was a study of the potential benefits of closed-loop active clearance control, along with laboratory tests of candidate clearance sensor elements for a closed loop system.

  12. 12 CFR 562.2 - Regulatory reports.

    Science.gov (United States)

    2010-01-01

    ... § 562.2 Regulatory reports. (a) Definition and scope. This section applies to all regulatory reports, as... (TFR) are examples of regulatory reports. Regulatory reports are regulatory documents, not accounting... limited to, the accounting instructions provided in the TFR, guidance contained in OTS regulations...

  13. 37 CFR 1.488 - Determination of unity of invention before the International Preliminary Examining Authority.

    Science.gov (United States)

    2010-07-01

    ..., and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF... International Searching Authority, or (3) If applicant fails to restrict the claims or pay additional fees... common inventive concept. In such a case the International Preliminary Examining Authority may raise the...

  14. 75 FR 60157 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2010-09-29

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate..., 2010, Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange... information about the rulebook consolidation process, see Information Notice, March 12, 2008 (Rulebook...

  15. 76 FR 20759 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-04-13

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate..., 2011, Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange.... For more information about the rulebook consolidation process, see Information Notice, March 12, 2008...

  16. 76 FR 40412 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-07-08

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate..., Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission... a more limited application by their terms. For more information about the rulebook consolidation...

  17. 75 FR 71164 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2010-11-22

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate..., 2010, Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange.... For more information about the rulebook consolidation process, see Information Notice, March 12, 2008...

  18. 77 FR 34379 - Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory...

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD06-6-000] Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold a joint meeting...

  19. 76 FR 60106 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-09-28

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate... 14, 2011, Financial Industry Regulatory Authority, Inc. (``FINRA'') (f/k/a National Association of.... For more information about the rulebook consolidation process, see Information Notice, March 12, 2008...

  20. 75 FR 41254 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving a...

    Science.gov (United States)

    2010-07-15

    ... registered capacity, may work in other investment-related industries, such as financial planning, or may seek...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving a Proposed Rule..., 2010, the Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and...

  1. Quality management of the nuclear regulatory body. Peer discussions on regulatory practices

    International Nuclear Information System (INIS)

    2001-09-01

    This report is the outcome of the ninth series of peer discussions on regulatory practices entitled Nuclear Regulatory Body Quality Management, held in March and May 2001, and which involved the participation of senior nuclear regulators from 23 IAEA Member States. This report conveys the essence of two peer group discussions and highlights some good practices identified by the participating senior regulators. The objective of the discussions was to share experiences of regulatory bodies in implementing QM systems in their own work so as to ensure that the regulatory control over the licensees is effective and efficient and is commensurate with the mandate assigned by their governments. The shared experiences and good practices presented in the report, however, do not necessarily reflect the views of and good practices endorsed by the governments of the nominating Member States, the organizations to which the regulators belong, or the IAEA. The report sets down the peer group's experience in developing, implementing and evaluating QM within their regulatory bodies and identifies points to bear in mind when introducing such a system. This report is structured so that it covers the subject matter under the main headings of: application of quality management to regulatory work; development and implementation of quality management; assessment and improvement of performance; and good practices

  2. Future nuclear regulatory challenges

    International Nuclear Information System (INIS)

    Royen, J.

    1998-01-01

    In December 1996, the NEA Committee on Nuclear Regulatory Activities concluded that changes resulting from economic deregulation and other recent developments affecting nuclear power programmes have consequences both for licensees and regulatory authorities. A number of potential problems and issues which will present a challenge to nuclear regulatory bodies over the next ten years have been identified in a report just released. (author)

  3. 77 FR 7218 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2012-02-10

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate... thereunder,\\2\\ notice is hereby given that on January 30, 2012, Financial Industry Regulatory Authority, Inc.... For more information about the rulebook consolidation process, see Information Notice, March 12, 2008...

  4. 75 FR 59771 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving the...

    Science.gov (United States)

    2010-09-28

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving the Proposed Rule.... I. Introduction On July 27, 2010, the Financial Industry Regulatory Authority, Inc. (``FINRA'') (f/k... pertinent distribution-related information from its members in a timely fashion to facilitate its Regulation...

  5. 76 FR 50796 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-08-16

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate Effectiveness of Proposed Rule Change To Increase the Position Limit for Options on the Standard and Poor's... Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission...

  6. Use of probabilistic risk assessments to define areas of possible exemption from regulatory requirements

    International Nuclear Information System (INIS)

    Thompson, C.A.; Carlson, D.; Kolaczkowski, A.; LaChance, J.

    1988-01-01

    The Risk-Based Licensing Program (RBLP) was sponsored by the Department of Energy for the purpose of establishing and demonstrating an approach for identifying potential areas for exemption from current regulatory requirements in the licensing of nuclear power plants. Such an approach could assist in the improvement of the regulatory process for both current and future nuclear plant designs. Use of the methodology could result in streamlining the regulatory process by eliminating unnecessarily detailed reviews of portions of a plant design not important to risk. The RBLP methodology utilizes probabilistic risk assessments, (PRAs), which are required of all future applicants for nuclear power plant licenses. PRA results are used as a screening tool to determine the risk significance of various plant features which are correlated to the risk importance of regulations to identify potential areas for regulatory exemption. Additional consideration is then given to non-risk factors in the final determination of exemption candidates. The RBLP methodology was demonstrated using an existing PRA. The results of the demonstration are highlighted. 10 refs

  7. Regulatory difficulties in a developing country

    International Nuclear Information System (INIS)

    Jacobs, W.R. Jr.

    1978-01-01

    The regulatory agency assigned the task of regulating the initial entry into the field of nuclear power generation by a developing country has a very difficult job. Based on the authors' experience during the start-up and initial operation of Ko-Ri Unit I, the first power reactor in the Republic of Korea, observations on regulatory difficulties and recommendations for improved regulatory effectiveness are offered. The problem areas can be loosely grouped into three general categories: (1) Lack of adequate technical knowledge which is the basis for all effective regulation; (2) Difficulties with understanding and utilization of the required regulatory documentation; (3) Failure to establish the proper regulatory environment. Examples are cited from actual experience during the Ko-Ri Unit I start-up to demonstrate the impact that regulatory activities can have on a plant construction and testing programme. The problems encountered are not unique to developing countries but also exist in the United States of America. Recommendations are offered which should be beneficial to either newly formed regulatory agencies or agencies wishing to improve their abilities and effectiveness. These include: (1) Additional training of regulatory inspectors in plant operations; (2) Additional experience gained by participation in regulatory activities in other countries; (3) Increased attention given to regulatory documents, especially plant technical specifications; (4) Establishment of formal lines of communication between the utility and the regulatory agency; (5) Clear definition of regulatory responsibilities to avoid areas of overlapping jurisdiction; (6) Active participation by the regulatory staff very early in the project. It is hoped that these and other recommendations offered will greatly improve regulatory effectiveness and at the same time demonstrate that when the decision is made to 'go nuclear', a strong commitment must be made to develop and support a technically

  8. Regulatory challenges associated with conducting multicountry clinical trials in resource-limited settings.

    Science.gov (United States)

    Ndebele, Paul; Blanchard-Horan, Christina; Shahkolahi, Akbar; Sanne, Ian

    2014-01-01

    International public health and infectious diseases research has expanded to become a global enterprise transcending national and continental borders in organized networks addressing high-impact diseases. In conducting multicountry clinical trials, sponsors and investigators have to ensure that they meet regulatory requirements in all countries in which the clinical trials will be conducted. Some of these requirements include review and approval by national drug regulatory authorities and recognized research ethics committees. A limiting factor to the efficient conduct of multicountry clinical trials is the regulatory environment in each collaborating country, with significant differences determined by various factors including the laws and the procedures used in each country. The long regulatory processes in resource-limited countries may hinder the efficient implementation of multisite clinical trials, delaying research important to the health of populations in these countries and costing millions of dollars a year.

  9. Regulatory control of nuclear power plants

    International Nuclear Information System (INIS)

    2002-01-01

    The purpose of this book is to support IAEA training courses and workshops in the field of regulatory control of nuclear power plants as well as to support the regulatory bodies of Member States in their own training activities. The target group is the professional staff members of nuclear safety regulatory bodies supervising nuclear power plants and having duties and responsibilities in the following regulatory fields: regulatory framework; regulatory organization; regulatory guidance; licensing and licensing documents; assessment of safety; and regulatory inspection and enforcement. Important topics such as regulatory competence and quality of regulatory work as well as emergency preparedness and public communication are also covered. The book also presents the key issues of nuclear safety such as 'defence-in-depth' and safety culture and explains how these should be taken into account in regulatory work, e.g. during safety assessment and regulatory inspection. The book also reflects how nuclear safety has been developed during the years on the basis of operating experience feedback and results of safety research by giving topical examples. The examples cover development of operating procedures and accident management to cope with complicated incidents and severe accidents to stress the importance of regulatory role in nuclear safety research. The main target group is new staff members of regulatory bodies, but the book also offers good examples for more experienced inspectors to be used as comparison and discussion basis in internal workshops organized by the regulatory bodies for refreshing and continuing training. The book was originally compiled on the basis of presentations provided during the two regulatory control training courses in 1997 and 1998. The textbook was reviewed at the beginning of the years 2000 and 2002 by IAEA staff members and consistency with the latest revisions of safety standards have been ensured. The textbook was completed in the

  10. 78 FR 75332 - Grain-Oriented Electrical Steel From the People's Republic of China: Postponement of Preliminary...

    Science.gov (United States)

    2013-12-11

    ... Steel From the People's Republic of China: Postponement of Preliminary Determination in the... Compliance, International Trade Administration, Department of Commerce, 14th Street and Constitution Avenue... electrical steel (GOES) from the People's Republic of China (PRC).\\1\\ Currently, the preliminary...

  11. Bioattractors: dynamical systems theory and the evolution of regulatory processes

    Science.gov (United States)

    Jaeger, Johannes; Monk, Nick

    2014-01-01

    In this paper, we illustrate how dynamical systems theory can provide a unifying conceptual framework for evolution of biological regulatory systems. Our argument is that the genotype–phenotype map can be characterized by the phase portrait of the underlying regulatory process. The features of this portrait – such as attractors with associated basins and their bifurcations – define the regulatory and evolutionary potential of a system. We show how the geometric analysis of phase space connects Waddington's epigenetic landscape to recent computational approaches for the study of robustness and evolvability in network evolution. We discuss how the geometry of phase space determines the probability of possible phenotypic transitions. Finally, we demonstrate how the active, self-organizing role of the environment in phenotypic evolution can be understood in terms of dynamical systems concepts. This approach yields mechanistic explanations that go beyond insights based on the simulation of evolving regulatory networks alone. Its predictions can now be tested by studying specific, experimentally tractable regulatory systems using the tools of modern systems biology. A systematic exploration of such systems will enable us to understand better the nature and origin of the phenotypic variability, which provides the substrate for evolution by natural selection. PMID:24882812

  12. Improving nuclear regulatory effectiveness

    International Nuclear Information System (INIS)

    2001-01-01

    Ensuring that nuclear installations are operated and maintained in such a way that their impact on public health and safety is as low as reasonably practicable has been and will continue to be the cornerstone of nuclear regulation. In the past, nuclear incidents provided the main impetus for regulatory change. Today, economic factors, deregulation, technological advancements, government oversight and the general requirements for openness and accountability are leading regulatory bodies to review their effectiveness. In addition, seeking to enhance the present level of nuclear safety by continuously improving the effectiveness of regulatory bodies is seen as one of the ways to strengthen public confidence in the regulatory systems. This report covers the basic concepts underlying nuclear regulatory effectiveness, advances being made and future requirements. The intended audience is primarily nuclear safety regulators, but government authorities, nuclear power plant operators and the general public may also be interested. (author)

  13. 75 FR 27606 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2010-05-17

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate...\\ and Rule 19b-4 thereunder,\\2\\ notice is hereby given that on April 27, 2010, the Financial Industry... restated following the formation of FINRA through the consolidation of NASD and the member regulatory...

  14. Features of course definition system control for a mode of preliminary bringing to horizon

    Directory of Open Access Journals (Sweden)

    О.А. Сущенко

    2004-03-01

    Full Text Available  The features of course definition system consisting of   platform in gimbal suspension, tuned rotor gyroscopes and pendulous accelerometers for a mode of preliminary bringing to horizon are reviewed. The mathematical description of the mode of preliminary bringing to horizon is derived and the appropriate control moments are determined.

  15. Nuclear Regulatory legislation

    International Nuclear Information System (INIS)

    1984-06-01

    This compilation of statutes and material pertaining to nuclear regulatory legislation through the 97th Congress, 2nd Session, has been prepared by the Office of the Executive Legal Director, U.S. Nuclear Regulatory Commission, with the assistance of staff, for use as an internal resource document

  16. 18 CFR 158.6 - Determination.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Determination. 158.6 Section 158.6 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT....6 Determination. If no formal hearing is had the matter in issue will be determined by the...

  17. Adolescents’ and Parents’ Regulatory Focus as Determinants of Future Time Perspective on School and Professional Career

    NARCIS (Netherlands)

    Andre, L.; van Vianen, A.E.M.; Peetsma, T.T.D.

    2017-01-01

    Future time perspective (FTP) - individuals' orientation towards future goals and consideration of future consequences - is a successful motivator in education and work. This study is the first that integrates Regulatory focus (RF) theory with FTP theory to explore relationships between adolescents'

  18. Regulatory approaches to hydrocarbon contamination from underground storage tanks

    International Nuclear Information System (INIS)

    Daugherty, S.J.

    1991-01-01

    Action or lack of action by the appropriate regulatory agency is often the most important factor in determining remedial action or closure requirements for hydrocarbon contaminated sites. This paper reports that the diversity of regulatory criteria is well known statewide and well documented nationally. In California, the diversity of approaches is due to: that very lack of a clear understanding of the true impact of hydrocarbon contamination: lack of state or federal standards for soil cleanup, and state water quality objectives that are not always achievable; vagueness in the underground storage tank law; and the number and diversity of agencies enforcing the underground storage tank regulations

  19. 75 FR 53998 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2010-09-02

    ... characteristics and risks of security futures. \\6\\ 15 U.S.C. 78o-3(b)(6). B. Self-Regulatory Organization's...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate Effectiveness of Proposed Rule Change To Amend the Security Futures Risk Disclosure Statement August 27, 2010...

  20. 78 FR 64935 - Borough of Ellwood City, Pennsylvania; Notice of Preliminary Determination of a Qualifying...

    Science.gov (United States)

    2013-10-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD14-3-000] Borough of..., P.E., Hill Engineering, 8 Gibson Street, North East, PA 16428, Phone No. (814) 725-8659. FERC... agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. [[Page...

  1. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1990-01-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  2. Demonstration of a repository performance assessment capability at the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Codell, R.; Eisenberg, N.; McCartin, T.; Park, J.

    1991-01-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. A demonstration of this capability used the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada

  3. 76 FR 31271 - Public Meeting: Preliminary Regulatory Determinations for the Third Contaminant Candidate List...

    Science.gov (United States)

    2011-05-31

    ..., DC metropolitan area on Thursday, June 16, 2011, from 1 p.m. to 5 p.m., Eastern Daylight Savings Time... business days prior to the meeting to give EPA time to process your request. Dated: May 24, 2011. Eric M...

  4. 18 CFR 41.6 - Determination.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Determination. 41.6 Section 41.6 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF....6 Determination. If no formal hearing is had the matter in issue will be determined by the...

  5. 18 CFR 349.6 - Determination.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Determination. 349.6 Section 349.6 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT... PROPOSED REMEDIES § 349.6 Determination. If no formal hearing is had the matter in issue will be determined...

  6. Licensing Support System: Preliminary data scope analysis

    International Nuclear Information System (INIS)

    1989-01-01

    The purpose of this analysis is to determine the content and scope of the Licensing Support System (LSS) data base. Both user needs and currently available data bases that, at least in part, address those needs have been analyzed. This analysis, together with the Preliminary Needs Analysis (DOE, 1988d) is a first effort under the LSS Design and Implementation Contract toward developing a sound requirements foundation for subsequent design work. These reports are preliminary. Further refinements must be made before requirements can be specified in sufficient detail to provide a basis for suitably specific system specifications. This document provides a baseline for what is known at this time. Additional analyses, currently being conducted, will provide more precise information on the content and scope of the LSS data base. 23 refs., 4 figs., 8 tabs

  7. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  8. An assessment of the contribution of NRC [Nuclear Regulatory Commission] regulatory growth to nuclear plant cost growth using engineering scope changes

    International Nuclear Information System (INIS)

    Cohen, S.

    1987-03-01

    The purpose of this study is to determine the contribution of NRC regulations to the growth in nuclear power plant capital costs using the case study method. The two plants selected for the case studies are Florida Power and Light Company's (FP and L) St. Lucie Unit 1 (SL1) and St. Lucie Unit 2 (SL2). SL1 was constructed in the early 1970s and was granted an operating license in 1976. SL2 was constructed in the late 1970s and early 1980s, and was granted an operating license in 1983. The information bases were the amendments to the contracts between FP and L and its architect-engineer/constructor, i.e., the ''scope changes''. These were examined and analyzed for causation, i.e., NRC-initiated or utility-initiated, and all of the costs associated with scope changes of each type were aggregated to determine the contribution of each. Although the scope changes accounted for only a small fraction of the total cost growth for either plant, they were still used to determine the relative contribution of regulatory growth to cost growth. Unexpectedly, a significantly higher percentage of out-of-scope work (approximately 84%) was attributable to NRC regulatory requirements for SL1 than SL2 (approximately 47%). These results were unexpected because SL2 was constructed during a period in which regulation was considered to be particularly unstable. However, a more detailed analysis of causation indicates that a shift occurred from an ad-hoc mode of regulation in the early 1970s to a more prescriptive process in the late 1970s. Thus the number of formal NRC requirements may not be a valid measure of regulatory stability

  9. Research and regulatory review

    International Nuclear Information System (INIS)

    Macleod, J.S.; Fryer, D.R.H.

    1979-01-01

    To enable the regulatory review to be effectively undertaken by the regulatory body, there is a need for it to have ready access to information generated by research activities. Certain advantages have been seen to be gained by the regulatory body itself directly allocating and controlling some portion of these activities. The princial reasons for reaching this conclusion are summarised and a brief description of the Inspectorates directly sponsored programme outlined. (author)

  10. 76 FR 12380 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2011-03-07

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of Amendment No. 1..., the Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange... information about the rulebook consolidation process, see Information Notice, March 12, 2008 (Rulebook...

  11. International Expert Team Concludes IAEA Peer Review of Finland's Regulatory Framework for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    Full text: International safety experts today concluded a two-week International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in Finland. In its preliminary report, the Integrated Regulatory Review Service (IRRS) mission team found that the Radiation and Nuclear Safety Authority of Finland (STUK) is a competent and highly credible regulator that is open and transparent and derives great strength from the technical competence of its staff. ''Finland's comprehensive regulatory framework allows STUK to operate in practice as an independent regulatory body,'' said team leader Philippe Jamet, a commissioner of the French regulatory body ASN. The mission was conducted at the request of the Government of Finland from 15-26 October. The team interviewed members of STUK and officials from various ministries, as well as key players in the Finnish safety framework. Such IRRS missions are peer reviews based on IAEA Safety Standards, not inspections or audits. The team was made up of 18 members from Bulgaria, Canada, the Czech Republic, France, Germany, Iceland, Ireland, Romania, the Russian Federation, South Africa, Slovakia, Slovenia, Spain, Sweden, the United Arab Emirates, the United Kingdom and the United States, as well as six IAEA staff members. 'The IRRS mission and preparation for it was a unique occasion that involved the whole organization, provided motivation for improvement of the safety framework in Finland and assists STUK review its mission', said Tero Varjoranta, Director General of STUK. The IRRS team identified a number of good practices and achievements, including: - STUK's excellence in its safety assessment of nuclear power plants and waste repositories, in particular its demonstration that long-term political commitment is a necessity to sustain the creation of a waste repository as well as its regulatory oversight of medical applications of radiation sources; and - STUK's excellent record in

  12. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1991-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  13. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1991-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  14. 75 FR 21299 - Determination of Regulatory Review Period for Purposes of Patent Extension; VIMPAT-NDA 22-254

    Science.gov (United States)

    2010-04-23

    ... additive, or color additive) was subject to regulatory review by FDA before the item was marketed. Under...). VIMPAT injection is indicated as adjunctive therapy in the treatment of partial-onset seizures in...

  15. 78 FR 62351 - North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-10-18

    ... amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The U Canal Hydro 2... industrial consumption and not primarily for the generation of electricity. FPA 30(a)(3)(C)(i), as amended by...

  16. 75 FR 2897 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2010-01-19

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of Proposed Rule... hereby given that on December 23, 2009, Financial Industry Regulatory Authority, Inc. (``FINRA'') (f/k/a... consolidation process, see Information Notice, March 12, 2008 (Rulebook Consolidation Process). NASD Rule 2450...

  17. Preliminary analysis of alternative fuel cycles for proliferation evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Steindler, M. J.; Ripfel, H. C.F.; Rainey, R. H.

    1977-01-01

    The ERDA Division of Nuclear Research and Applications proposed 67 nuclear fuel cycles for assessment as to their nonproliferation potential. The object of the assessment was to determine which fuel cycles pose inherently low risk for nuclear weapon proliferation while retaining the major benefits of nuclear energy. This report is a preliminary analysis of these fuel cycles to develop the fuel-recycle data that will complement reactor data, environmental data, and political considerations, which must be included in the overall evaluation. This report presents the preliminary evaluations from ANL, HEDL, ORNL, and SRL and is the basis for a continuing in-depth study. (DLC)

  18. Through the regulatory hoop

    International Nuclear Information System (INIS)

    Kirner, N.P.

    1985-01-01

    There are many regulatory hoops through which waste generators, brokers, and disposal site operators must jump to dispose of waste safely. As the proposed exclusionary date of January 1, 1986, approaches, these regulatory hoops have the distinct possibility of multiplying or at least changing shape. The state of Washington, in its role as an Agreement State with the US Nuclear Regulatory Commission, licenses and inspects the commercial operator of the Northwest Compact's low-level radioactive waste disposal site on the Hanford Reservation. Washington has received as much as 53%, or 1.4 million cubic feet per year, of the nation's total volume of waste disposed. To control such a large volume of waste, a regulatory program involving six agencies has developed over the years in Washington

  19. Preliminary studies to determine the shelf life of HEPA filters

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, H.; Fretthold, J.K.; Rainer, F. [Lawrence Livermore National Laboratory, CA (United States)] [and others

    1995-02-01

    We have completed a preliminary study using filter media tests and filter qualification tests to investigate the effect of shelf-life on HEPA filter performance. Our media studies showed that the tensile strength decreased with age, but the data were not sufficient to establish a shelf-life. Thermogravimetric analyses demonstrated that one manufacturer had media with low tensile strength due to insufficient binder. The filter qualification tests (heated air and overpressure) conducted on different aged filters showed that filter age is not the primary factor affecting filter performance; materials and the construction design have a greater effect. An unexpected finding of our study was that sub-standard HEPA filters have been installed in DOE facilities despite existing regulations and filter qualification tests. We found that the filter with low tensile strength failed the overpressure test. The same filter had passed the heated air test, but left the filter so structurally weak, it was prone to blow-out. We recommend that DOE initiate a filter qualification program to prevent this occurrence.

  20. Regulatory Control of Radiation Sources. Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is intended to assist States in implementing the requirements established in Safety Standards Series No. GS-R-1, Legal and Governmental Infrastructure for Nuclear, Radiation, Radioactive Waste and Transport Safety, for a national regulatory infrastructure to regulate any practice involving radiation sources in medicine, industry, research, agriculture and education. The Safety Guide provides advice on the legislative basis for establishing regulatory bodies, including the effective independence of the regulatory body. It also provides guidance on implementing the functions and activities of regulatory bodies: the development of regulations and guides on radiation safety; implementation of a system for notification and authorization; carrying out regulatory inspections; taking necessary enforcement actions; and investigating accidents and circumstances potentially giving rise to accidents. The various aspects relating to the regulatory control of consumer products are explained, including justification, optimization of exposure, safety assessment and authorization. Guidance is also provided on the organization and staffing of regulatory bodies. Contents: 1. Introduction; 2. Legal framework for a regulatory infrastructure; 3. Principal functions and activities of the regulatory body; 4. Regulatory control of the supply of consumer products; 5. Functions of the regulatory body shared with other governmental agencies; 6. Organization and staffing of the regulatory body; 7. Documentation of the functions and activities of the regulatory body; 8. Support services; 9. Quality management for the regulatory system.

  1. 75 FR 21298 - Determination of Regulatory Review Period for Purposes of Patent Extension; VIMPAT -NDA 22-253

    Science.gov (United States)

    2010-04-23

    ... additive, or color additive) was subject to regulatory review by FDA before the item was marketed. Under... (lacosamide). VIMPAT tablets are indicated as adjunctive therapy in the treatment of partial-onset seizures in...

  2. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1991-10-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  3. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  4. Efficient Reverse-Engineering of a Developmental Gene Regulatory Network

    Science.gov (United States)

    Cicin-Sain, Damjan; Ashyraliyev, Maksat; Jaeger, Johannes

    2012-01-01

    Understanding the complex regulatory networks underlying development and evolution of multi-cellular organisms is a major problem in biology. Computational models can be used as tools to extract the regulatory structure and dynamics of such networks from gene expression data. This approach is called reverse engineering. It has been successfully applied to many gene networks in various biological systems. However, to reconstitute the structure and non-linear dynamics of a developmental gene network in its spatial context remains a considerable challenge. Here, we address this challenge using a case study: the gap gene network involved in segment determination during early development of Drosophila melanogaster. A major problem for reverse-engineering pattern-forming networks is the significant amount of time and effort required to acquire and quantify spatial gene expression data. We have developed a simplified data processing pipeline that considerably increases the throughput of the method, but results in data of reduced accuracy compared to those previously used for gap gene network inference. We demonstrate that we can infer the correct network structure using our reduced data set, and investigate minimal data requirements for successful reverse engineering. Our results show that timing and position of expression domain boundaries are the crucial features for determining regulatory network structure from data, while it is less important to precisely measure expression levels. Based on this, we define minimal data requirements for gap gene network inference. Our results demonstrate the feasibility of reverse-engineering with much reduced experimental effort. This enables more widespread use of the method in different developmental contexts and organisms. Such systematic application of data-driven models to real-world networks has enormous potential. Only the quantitative investigation of a large number of developmental gene regulatory networks will allow us to

  5. Nuclear regulatory decision making

    International Nuclear Information System (INIS)

    Wieland, Patricia; Almeida, Ivan Pedro Salati de

    2011-01-01

    The scientific considerations upon which the nuclear regulations are based provide objective criteria for decisions on nuclear safety matters. However, the decisions that a regulatory agency takes go far beyond granting or not an operating license based on assessment of compliance. It may involve decisions about hiring experts or research, appeals, responses to other government agencies, international agreements, etc.. In all cases, top management of the regulatory agency should hear and decide the best balance between the benefits of regulatory action and undue risks and other associated impacts that may arise, including issues of credibility and reputation. The establishment of a decision framework based on well established principles and criteria ensures performance stability and consistency, preventing individual subjectivity. This article analyzes the challenges to the decision-making by regulatory agencies to ensure coherence and consistency in decisions, even in situations where there is uncertainty, lack of reliable information and even divergence of opinions among experts. The article explores the basic elements for a framework for regulatory decision-making. (author)

  6. Nuclear regulatory decision making

    International Nuclear Information System (INIS)

    2005-01-01

    The fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear utilities operate their plants at all times in an acceptably safe manner. In meeting this objective, the regulatory body should strive to ensure that its regulatory decisions are technically sound, consistent from case to case, and timely. In addition, the regulator must be aware that its decisions and the circumstances surrounding those decisions can affect how its stakeholders, such as government policy makers, the industry it regulates, and the public, view it as an effective and credible regulator. In order to maintain the confidence of those stakeholders, the regulator should make sure that its decisions are transparent, have a clear basis in law and regulations, and are seen by impartial observers to be fair to all parties. Based on the work of a Nuclear Energy Agency (NEA) expert group, this report discusses some of the basic principles and criteria that a regulatory body should consider in making decisions and describes the elements of an integrated framework for regulatory decision making. (author)

  7. Validation of innovative technologies and strategies for regulatory safety assessment methods: challenges and opportunities.

    Science.gov (United States)

    Stokes, William S; Wind, Marilyn

    2010-01-01

    Advances in science and innovative technologies are providing new opportunities to develop test methods and strategies that may improve safety assessments and reduce animal use for safety testing. These include high throughput screening and other approaches that can rapidly measure or predict various molecular, genetic, and cellular perturbations caused by test substances. Integrated testing and decision strategies that consider multiple types of information and data are also being developed. Prior to their use for regulatory decision-making, new methods and strategies must undergo appropriate validation studies to determine the extent that their use can provide equivalent or improved protection compared to existing methods and to determine the extent that reproducible results can be obtained in different laboratories. Comprehensive and optimal validation study designs are expected to expedite the validation and regulatory acceptance of new test methods and strategies that will support improved safety assessments and reduced animal use for regulatory testing.

  8. Virginia Power's regulatory reduction program

    International Nuclear Information System (INIS)

    Miller, G.D.

    1996-01-01

    Virginia Power has two nuclear plants, North Anna and Surry Power Stations, which have two units each for a total of four nuclear units. In 1992, the Nuclear Regulatory Commission solicited comments from the nuclear industry to obtain their ideas for reducing the regulatory burden on nuclear facilities. Pursuant to the new regulatory climate, Virginia Power developed an internal program to evaluate and assess the regulatory and self-imposed requirements to which they were committed, and to pursue regulatory relief or internal changes where possible and appropriate. The criteria were that public safety must be maintained, and savings must be significant. Up to the date of the conference, over US$22 million of one-time saving had been effected, and US$2.75 million in annual savings

  9. 75 FR 7526 - Withdrawal of Regulatory Guide

    Science.gov (United States)

    2010-02-19

    ...'s Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections . Regulatory guides are... NUCLEAR REGULATORY COMMISSION [NRC-2010-0052] Withdrawal of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 1.56, ``Maintenance of Water Purity in Boiling...

  10. KWOC [Key-Word-Out-of-Context] Index of US Nuclear Regulatory Commission Regulatory Guide Series

    International Nuclear Information System (INIS)

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE ''KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series

  11. Professional and Regulatory Search

    Science.gov (United States)

    Professional and Regulatory search are designed for people who use EPA web resources to do their job. You will be searching collections where information that is not relevant to Environmental and Regulatory professionals.

  12. Regulatory immune cells and functions in autoimmunity and transplantation immunology.

    Science.gov (United States)

    Papp, Gabor; Boros, Peter; Nakken, Britt; Szodoray, Peter; Zeher, Margit

    2017-05-01

    In physiological circumstances, various tolerogenic mechanisms support the protection of self-structures during immune responses. However, quantitative and/or qualitative changes in regulatory immune cells and mediators can evoke auto-reactive immune responses, and upon susceptible genetic background, along with the presence of other concomitant etiological factors, autoimmune disease may develop. In transplant immunology, tolerogenic mechanisms are also critical, since the balance between of alloantigen-reactive effector cells and the regulatory immune cells will ultimately determine whether a graft is accepted or rejected. Better understanding of the immunological tolerance and the potential modulations of immune regulatory processes are crucial for developing effective therapies in autoimmune diseases as well as in organ transplantation. In this review, we focus on the novel insights regarding the impaired immune regulation and other relevant factors contributing to the development of auto-reactive and graft-reactive immune responses in autoimmune diseases and transplant rejection, respectively. We also address some promising approaches for modification of immune-regulatory processes and tolerogenic mechanisms in autoimmunity and solid organ transplantation, which may be beneficial in future therapeutic strategies. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Perceptions of regulatory approaches

    International Nuclear Information System (INIS)

    Halin, Magnus; Leinonen, Ruusaliisa

    2012-01-01

    Ms. Ruusaliisa Leinonen and Mr. Magnus Halin from Fortum gave a joint presentation on industry perceptions of regulatory oversight of LMfS/SC. It was concluded that an open culture of discussion exists between the regulator (STUK) and the licensee, based on the common goal of nuclear safety. An example was provided of on how regulatory interventions helped foster improvements to individual and collective dose rate trends, which had remained static. Regulatory interventions included discussions on the ALARA concept to reinforce the requirement to continuously strive for improvements in safety performance. Safety culture has also been built into regulatory inspections in recent years. Training days have also been organised by the regulatory body to help develop a shared understanding of safety culture between licensee and regulatory personnel. Fortum has also developed their own training for managers and supervisors. Training and ongoing discussion on LMfS/SC safety culture is considered particularly important because both Fortum and the regulatory body are experiencing an influx of new staff due to the demographic profile of their organisations. It was noted that further work is needed to reach a common understanding of safety culture on a practical level (e.g., for a mechanic setting to work), and in relation to the inspection criteria used by the regulator. The challenges associated with companies with a mix of energy types were also discussed. This can make it more difficult to understand responsibilities and decision making processes, including the role of the parent body organisation. It also makes communication more challenging due to increased complexity and a larger number of stakeholders

  14. Preliminary results of testing bioassay analytical performance standards

    International Nuclear Information System (INIS)

    Fisher, D.R.; Robinson, A.V.; Hadley, R.T.

    1983-08-01

    The analytical performance of both in vivo and in vitro bioassay laboratories is being studied to determine the capability of these laboratories to meet the minimum criteria for accuracy and precision specified in the draft ANSI Standard N13.30, Performance Criteria for Radiobioassay. This paper presents preliminary results of the first round of testing

  15. Development and preliminary validation of the Opioid Abuse Risk Screener

    Directory of Open Access Journals (Sweden)

    Patricia Henrie-Barrus

    2016-05-01

    Full Text Available Prescription opioid drug abuse has reached epidemic proportions. Individuals with chronic pain represent a large population at considerable risk of abusing opioids. The Opioid Abuse Risk Screener was developed as a comprehensive self-administered measure of potential risk that includes a wide range of critical elements noted in the literature to be relevant to opioid risk. The creation, refinement, and preliminary modeling of the item pool, establishment of preliminary concurrent validity, and the determination of the factor structure are presented. The initial development and validation of the Opioid Abuse Risk Screener shows promise for effective risk stratification.

  16. 77 FR 12098 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2012-02-28

    ... 240.19b-4. I. Self-Regulatory Organization's Statement of the Terms of Substance of the Proposed Rule... FINRA and at the Commission's Public Reference Room. II. Self-Regulatory Organization's Statement of the..., and C below, of the most significant aspects of such statements. A. Self-Regulatory Organization's...

  17. The complex between SOS3 and SOS2 regulatory domain from Arabidopsis thaliana: cloning, expression, purification, crystallization and preliminary X-ray analysis

    Energy Technology Data Exchange (ETDEWEB)

    Sánchez-Barrena, María José; Moreno-Pérez, Sandra; Angulo, Iván; Martínez-Ripoll, Martín; Albert, Armando, E-mail: xalbert@iqfr.csic.es [Grupo de Cristalografía Macromolecular y Biología Estructural, Instituto de Química Física ‘Rocasolano’, Consejo Superior de Investigaciones Científicas, Serrano 119, E-28006 Madrid (Spain)

    2007-07-01

    Recombinant SOS3 and SOS2 regulatory domain from A. thaliana have been coexpressed in E. coli, purified and crystallized by the hanging-drop vapour-diffusion method. An X-ray data set has been collected at 2.0 Å resolution. The salt-tolerance genes SOS3 (salt overly sensitive 3) and SOS2 (salt overly sensitive 2) regulatory domain of Arabidopsis thaliana were cloned into a polycistronic plasmid and the protein complex was expressed in Escherichia coli, allowing purification to homogeneity in three chromatographic steps. Crystals were grown using vapour-diffusion techniques. The crystals belonged to space group P2{sub 1}2{sub 1}2{sub 1}, with unit-cell parameters a = 44.14, b = 57.39, c = 141.90 Å.

  18. MALLARD REPRODUCTIVE TESTING IN A POND ENVIRONMENT: A PRELIMINARY STUDY

    Science.gov (United States)

    A 2-year preliminary study was conducted on mallard ducks to determine the feasibility of using outdoor pond enclosures for reproductive studies and to evaluate the effects of the insecticide chlorpyrifos on mallard reproduction. No significant reproductive effects were observed ...

  19. 76 FR 9840 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2011-02-22

    .... 78s(b)(1). \\2\\ 17 CFR 240.19b-4. I. Self-Regulatory Organization's Statement of the Terms of Substance... Public Reference Room. II. Self-Regulatory Organization's Statement of the Purpose of, and Statutory..., and C below, of the most significant aspects of such statements. A. Self-Regulatory Organization's...

  20. Criteria for safety related nuclear plant operator actions: a preliminary assessment of available data

    International Nuclear Information System (INIS)

    Haas, P.M.; Bott, T.F.

    1982-01-01

    The need for a quantitative data base on the reliability of nuclear power plant operators has long been recognised by human factors and reliability analysts, and the great need for further assessment of operator performance under accident conditions has been dramatically emphasised by the incident at Three Mile Island-2. In the US, an effort has been under way for a number of years to develop a design standard to define when required manual operator action can be accepted as part of a nuclear plant design basis. To provide the necessary data base to support such standards and the necessary quantitative assessment of operator reliability, the US Nuclear Regulatory Commission is sponsoring a study at Oak Ridge National Laboratory to develop the data base. A preliminary assessment, completed in April 1979, concluded that sufficient data from US operating experience did not exist to provide an adequate data base. A programme of research using full-scope nuclear plant simulators and results that are correlated to field data was suggested. That programme was recently initiated. This paper reviews the approach, results and conclusions of the preliminary assessment and summarises the planned research programme of simulator studies. (author)

  1. 75 FR 11847 - Certain Magnesia Carbon Bricks From the People's Republic of China: Preliminary Determination of...

    Science.gov (United States)

    2010-03-12

    ... of production costs invalid under the Department's normal methodologies. See, e.g., Preliminary..., Indonesia, Colombia, Thailand, and Peru are countries comparable to the PRC in terms of economic development... to base NV, in most circumstances, on the NME producer's factors of production (``FOP'') valued in a...

  2. Nuclear Regulatory Legislation

    International Nuclear Information System (INIS)

    1989-08-01

    This compilation of statutes and material pertaining to nuclear regulatory legislation through the 100th Congress, 2nd Session, has been prepared by the Office of the General Counsel, US Nuclear Regulatory Commission, with the assistance of staff, for use as an internal resource document. Persons using this document are placed on notice that it may not be used as an authoritative citation in lieu of the primary legislative sources. Furthermore, while every effort has been made to ensure the completeness and accuracy of this material, neither the United States Government, the Nuclear Regulatory Commission, nor any of their employees makes any expressed or implied warranty or assumes liability for the accuracy or completeness of the material presented in this compilation

  3. Risk-based Regulatory Evaluation Program methodology

    International Nuclear Information System (INIS)

    DuCharme, A.R.; Sanders, G.A.; Carlson, D.D.; Asselin, S.V.

    1987-01-01

    The objectives of this DOE-supported Regulatory Evaluation Progrwam are to analyze and evaluate the safety importance and economic significance of existing regulatory guidance in order to assist in the improvement of the regulatory process for current generation and future design reactors. A risk-based cost-benefit methodology was developed to evaluate the safety benefit and cost of specific regulations or Standard Review Plan sections. Risk-based methods can be used in lieu of or in combination with deterministic methods in developing regulatory requirements and reaching regulatory decisions

  4. Methodology for the Systematic Assessment of the Regulatory Competence Needs (SARCoN) for Regulatory Bodies of Nuclear Installations

    International Nuclear Information System (INIS)

    2015-03-01

    A regulatory body’s competence is dependent, among other things, on the competence of its staff. A necessary, but not sufficient, condition for a regulatory body to be competent is that its staff can perform the tasks related to the functions of the regulatory body. In 2001, the IAEA published TECDOC 1254, Training the Staff of the Regulatory Body for Nuclear Facilities: A Competency Framework, which examines the manner in which the recognized regulatory functions of a nuclear regulatory body results in competence needs. Using the internationally recognized systematic approach to training, TECDOC 1254 provides a framework for regulatory bodies for managing training and developing, and maintaining the competence of its staff. It has been successfully used by many regulatory bodies all over the world, including States embarking on a nuclear power programme. The IAEA has also introduced a methodology and an assessment tool — Guidelines for Systematic Assessment of Regulatory Competence Needs (SARCoN) — which provides practical guidance on analysing the training and development needs of a regulatory body and, through a gap analysis, guidance on establishing competence needs and how to meet them. In 2013, the IAEA published Safety Reports Series No. 79, Managing Regulatory Body Competence, which provides generic guidance based on IAEA safety requirements in the development of a competence management system within a regulatory body’s integrated management system. An appendix in the Safety Report deals with the special case of building up the competence of regulatory bodies as part of the overall process of establishing an embarking State’s regulatory system. This publication provides guidance for the analysis of required and existing competences to identify those required by the regulatory body to perform its functions and therefore associated needs for acquiring competences. Hence, it is equally applicable to the needs of States embarking on nuclear power

  5. Behavioral Economic Laboratory Research in Tobacco Regulatory Science.

    Science.gov (United States)

    Tidey, Jennifer W; Cassidy, Rachel N; Miller, Mollie E; Smith, Tracy T

    2016-10-01

    Research that can provide a scientific foundation for the United States Food and Drug Administration (FDA) tobacco policy decisions is needed to inform tobacco regulatory policy. One factor that affects the impact of a tobacco product on public health is its intensity of use, which is determined, in part, by its abuse liability or reinforcing efficacy. Behavioral economic tasks have considerable utility for assessing the reinforcing efficacy of current and emerging tobacco products. This paper provides a narrative review of several behavioral economic laboratory tasks and identifies important applications to tobacco regulatory science. Behavioral economic laboratory assessments, including operant self-administration, choice tasks and purchase tasks, can be used generate behavioral economic data on the effect of price and other constraints on tobacco product consumption. These tasks could provide an expedited simulation of the effects of various tobacco control policies across populations of interest to the FDA. Tobacco regulatory research questions that can be addressed with behavioral economic tasks include assessments of the impact of product characteristics on product demand, assessments of the abuse liability of novel and potential modified risk tobacco products (MRTPs), and assessments of the impact of conventional and novel products in vulnerable populations.

  6. 76 FR 9838 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2011-02-22

    .... 78s(b)(1). \\2\\ 17 CFR 240.19b-4. I. Self-Regulatory Organization's Statement of the Terms of Substance..., and at the Commission's Public Reference Room. II. Self-Regulatory Organization's Statement of the... in sections A, B, and C below, of the most significant aspects of such statements. A. Self-Regulatory...

  7. determination of sex in south african blacks by discriminant function analysis of mandibular linear dimensions : A preliminary investigation using the zulu local population.

    Science.gov (United States)

    Franklin, Daniel; O'Higgins, Paul; Oxnard, Charles E; Dadour, Ian

    2006-12-01

    The determination of sex is a critical component in forensic anthropological investigation. The literature attests to numerous metrical standards, each utilizing diffetent skeletal elements, for sex determination in South A frican Blacks. Metrical standards are popular because they provide a high degree of expected accuracy and are less error-prone than subjective nonmetric visual techniques. We note, however, that there appears to be no established metric mandible discriminant function standards for sex determination in this population.We report here on a preliminary investigation designed to evaluate whether the mandible is a practical element for sex determination in South African Blacks. The sample analyzed comprises 40 nonpathological Zulu individuals drawn from the R.A. Dart Collection. Ten linear measurements, obtained from mathematically trans-formed three-dimensional landmark data, are analyzed using basic univariate statistics and discriminant function analyses. Seven of the 10 measurements examined are found to be sexually dimorphic; the dimensions of the ramus are most dimorphic. The sex classification accuracy of the discriminant functions ranged from 72.5 to 87.5% for the univariate method, 92.5% for the stepwise method, and 57.5 to 95% for the direct method. We conclude that the mandible is an extremely useful element for sex determination in this population.

  8. Regulatory, design and methodological impacts in determining tidal-in-stream power resource potential

    International Nuclear Information System (INIS)

    Atwater, Joel F.; Lawrence, Gregory A.

    2011-01-01

    Tidal-in-Stream energy has been heralded by many as a significant potential source for clean power, a scheme where kinetic energy is extracted from tidal currents. A number of estimates have suggested that tidal power may become a sizeable fraction of overall electricity generation, however these estimates have been largely based on a resource assessment methodology that dramatically oversimplifies the physical phenomenon at play. This paper develops a model that considers the effect of energy extraction on the bulk flow, showing that tidal energy inventories that assess solely kinetic energy flux may represent both an order-of-magnitude overestimation of the resource and a significant oversimplification of regulatory impacts. The interplay between the characteristics of a flow and the regulatory and economic issues will likely limit tidal power generation to levels significantly below the physical maximums. Permitted flow reduction, turbine design and staging of development all have significant and predictable impacts on the extractible resource. Energy planners must therefore understand these relationships in order to appropriately assess the magnitude of generation that can be realistically be produced from tidal energy. - Research highlights: → Inventorying kinetic energy is not appropriate for assessing the tidal energy potential and may overestimate the resource by orders of magnitude. → The physical maximum for tidal power extraction is 38% of the total fluid power of a channel and causes a flow reduction of 42%. → Any amount of tidal power generation will reduce the flow rate in a channel. → Limiting the permitted reduction in flow significantly reduces the available resource. → Turbine efficiency is important as extraneous resistance depletes the resource without providing power generation.

  9. First update to the US Nuclear Regulatory Commission's regulatory strategy for the high-level waste repository program

    International Nuclear Information System (INIS)

    Johnson, R.L.; Linehan, J.J.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the initial strategy and summarizes progress and future activities. This paper summarizes the first update of the regulatory strategy. In general the overall strategy of identifying and reducing uncertainties is unchanged. Identifying regulatory and institutional uncertainties is essentially complete, and therefore, the current and future emphasis is on reducing those regulatory and institutional uncertainties identified to date. The NRC staff has improved the methods of reducing regulatory uncertainties by (1) enhancing the technical basis preparation process for potential rulemakings and guidance and (2) designing a new guidance document, called a staff position, for clarifying regulatory uncertainties. For guiding the US DOE's reduction of technical uncertainties, the NRC staff will give more emphasis to prelicense application reviews and less emphasis on preparing staff technical positions

  10. National legislative and regulatory activities

    International Nuclear Information System (INIS)

    2012-01-01

    This section gathers the following national legislative and regulatory activities sorted by country: Bulgaria: General legislation; Czech Republic: General legislation; France: General legislation, Regulatory infrastructure and activity; Germany: General legislation; India: Liability and compensation, Organisation and structure; Ireland: Radiation protection, General legislation; Korea (Republic of): Organisation and structure; Lithuania: Regulatory infrastructure and activity, Radioactive waste management, Radiation protection, international cooperation, Nuclear safety; Poland: General legislation; Romania: Environmental protection; Russian Federation: Radioactive waste management; Slovenia: Nuclear safety; Spain: Liability and compensation, Nuclear security; Sweden: Nuclear safety; Turkey: Radiation protection, Regulatory infrastructure and activity, Nuclear safety, Liability and compensation; United States: General legislation

  11. Developing regulatory approaches

    International Nuclear Information System (INIS)

    Axelsson, Lars

    2012-01-01

    Lars Axelsson presented SSM progress on oversight of LMfS/SC since the Chester 1 Workshop in 2007. Current SSM approaches for safety culture oversight include targeted safety management and safety culture inspections, compliance inspections which cover aspects of safety management/safety culture and multi-disciplinary team inspections. Examples of themes for targeted inspections include management of ambiguous operational situations or other weak signals, understanding of and attitudes to Human Performance tools, the Safety Department's role and authority and Leadership for safety. All regulatory activities provide inputs for the SSM yearly safety evaluation of each licensee. A form has been developed to capture safety culture observations from inspections and other interactions with licensees. Analysis will be performed to identify patterns and provide information to support planning of specific Safety Culture activities. Training has been developed for regulatory staff to enhance the quality of regulatory interventions on safety culture. This includes a half-day seminar to provide an overview of safety culture, and a workshop which provides more in-depth discussion on cultural issues and how to capture those during regulatory activities. Future plans include guidance for inspectors, and informal seminars on safety culture with licensees

  12. 10 CFR 26.189 - Determination of fitness.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Determination of fitness. 26.189 Section 26.189 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Determining Fitness-for-Duty Policy Violations and Determining Fitness § 26.189 Determination of fitness. (a) A determination of fitness is the process entered...

  13. Comparison of ISO 9000 and recent software life cycle standards to nuclear regulatory review guidance

    International Nuclear Information System (INIS)

    Preckshot, G.G.; Scott, J.A.

    1998-01-01

    Lawrence Livermore National Laboratory is assisting the Nuclear Regulatory Commission with the assessment of certain quality and software life cycle standards to determine whether additional guidance for the U.S. nuclear regulatory context should be derived from the standards. This report describes the nature of the standards and compares the guidance of the standards to that of the recently updated Standard Review Plan

  14. Summary of cost projection for regulatory uncertainties in the back end of the fuel cycle

    International Nuclear Information System (INIS)

    Raudenbush, M.H.; Geller, L.

    1977-01-01

    Fuel recycle cost deviations resulting from regulatory changes in the back end of the fuel cycle are examined from a number of different data sources, and three potentially large cost uncertainties are identified; HLW disposal, alpha-waste criteria, and in-plant material control/accountability for safeguards. Present and past methods of regulatory cost effectiveness determinations are critiqued and in some cases found wanting

  15. Regulation of CD8+ T cell responses to retinal antigen by local FoxP3+ regulatory T cells

    Directory of Open Access Journals (Sweden)

    Scott W McPherson

    2012-06-01

    Full Text Available While pathogenic CD4 T cells are well known mediators of autoimmune uveoretinitis, CD8 T cells can also be uveitogenic. Since preliminary studies indicated that C57BL/6 mice were minimally susceptible to autoimmune uveoretinitis induction by CD8 T cells, the basis of the retinal disease resistance was sought. Mice that express β-galactosidase (βgal on a retina-specific promoter (arrβgal mice were backcrossed to mice expressing green fluorescent protein and diphtheria toxin receptor under control of the Foxp3 promoter (Foxp3-DTR/GFP mice, and to T cell receptor transgenic mice that produce βgal specific CD8 T cells (BG1 mice. These mice were used to explore the role of regulatory T cells in the resistance to retinal autoimmune disease. Experiments with T cells from double transgenic BG1 x Foxp3-DTR/GFP mice transferred into Foxp3-DTR/GFP x arrβgal mice confirmed that the retina was well protected from attempts to induce disease by adoptive transfer of activated BG1 T cells. The successful induction of retinal disease following unilateral intraocular administration of diphtheria toxin to deplete regulatory T cells showed that the protective activity was dependent on local, toxin-sensitive regulatory T cells; the opposite, untreated eye remained disease-free. Although there were very few Foxp3+ regulatory T cells in the parenchyma of quiescent retina, and they did not accumulate in retina, their depletion by local toxin administration led to disease susceptibility. We propose that these regulatory T cells modulate the pathogenic activity of βgal-specific CD8 T cells in the retinas of arrβgal mice on a local basis, allowing immunoregulation to be responsive to local conditions.

  16. Innovative approach to training radiation safety regulatory professionals

    International Nuclear Information System (INIS)

    Gilley, Debbie Bray

    2008-01-01

    Full text: The supply of human resources required to adequately manage a radiation safety regulatory program has diminished in the last five years. Competing professional opportunities and a reduction in the number of health physics secondary schools have made it necessary to look at alternative methods of training. There are limited educational programs in the US that prepare our professionals for careers in the Radiation Regulatory Programs. The state of Florida's radiation control program embraced a new methodology using a combination of didactic and work experience using qualification journals, subject matter experts, and formalized training to develop a qualified pool of employees to perform the regulatory functions and emergency response requirements of a state radiation control program. This program uses a task-based approach to identify training needs and draws upon current staff to develop and implement the training. This has led to a task-oriented staff capable of responding to basic regulatory and emergency response activities within one year of employment. Florida's program lends itself to other states or countries with limited resources that have experienced staff attrition due to retirement or competing employment opportunities. Information on establishing a 'task-based' pool of employees that can perform basic regulatory functions and emergency response after one year of employment will be described. Initial task analysis of core functions and methodology is used to determine the appropriate training methodology for these functions. Instructions will be provided on the methodology used to 'mentor' new employees and then incorporate the new employees into the established core functions and be a useful employee at the completion of the first year of employment. New training philosophy and regime may be useful in assisting in the development of programs in countries and states with limited resources for training radiation protection personnel. (author)

  17. Industry petition for rulemaking on the disposal of below-regulatory-concern wastes

    International Nuclear Information System (INIS)

    Tipton, T.E.

    1989-01-01

    The Nuclear Management and Resources Council, Inc., in conjunction with the Edison Electric Institute, plans to submit a petition for rulemaking entitled Petition for Rulemaking Regarding Disposal of Below Regulatory Concern Wastes from commercial Nuclear Power Plants to the U.S. Nuclear Regulatory Commission (NRC). This petition for rulemaking, which is being filed pursuant to 10CFR2.802 and 10CFR2, Appendix B of the Code of Federal Regulations, requests the NRC to promulgate a rule authorizing the treatment and disposal of low-level radioactive wastes (LLW) determined to be below regulatory concern (BRC) in other than licensed LLW disposal facilities. The proposed rule will apply only to LLW generated at commercial nuclear power plants. The petition is based on detailed scientific and technical data derived through an extensive research program conducted by the Electric Power Research Institute, Inc. It addresses the 14 decision criteria that the NRC will employ in judging whether to grant the petition. The petition also provides an environmental assessment and finding of no significant impact and regulatory analysis. The purpose of the environmental assessment is to discuss alternatives, consequences, and impacts analyzed to support the recommendation of the proposed rule. The regulatory analysis addresses the need for and consequences of the proposed regulatory action as it relates to the protection of public health and safety

  18. Trust in regulatory regimes

    NARCIS (Netherlands)

    Six, Frédérique; Verhoest, Koen

    2017-01-01

    Within political and administrative sciences generally, trust as a concept is contested, especially in the field of regulatory governance. This groundbreaking book is the first to systematically explore the role and dynamics of trust within regulatory regimes. Conceptualizing, mapping and analyzing

  19. Bank regulatory Capital Buffer and Liquidity: Evidence from US and European Publicly Traded Banks

    OpenAIRE

    Distinguin , Isabelle; Roulet , Caroline; Tarazi , Amine

    2012-01-01

    The theory of financial intermediation highlights various channels through which capital and liquidity are interrelated. Using a simultaneous equations framework, we investigate the relationship between bank regulatory capital buffer and liquidity for European and U.S. publicly traded commercial banks. Previous research studying the determinants of bank capital buffer has neglected the role of liquidity. On the whole, we find that banks do not strengthen their regulatory capital buffer when t...

  20. Crystallization and preliminary X-ray diffraction analysis of iron regulatory protein 1 in complex with ferritin IRE RNA

    International Nuclear Information System (INIS)

    Selezneva, Anna I.; Cavigiolio, Giorgio; Theil, Elizabeth C.; Walden, William E.; Volz, Karl

    2006-01-01

    The iron regulatory protein IRP1 has been crystallized in a complex with ferritin IRE RNA and a complete data set has been collected to 2.8 Å resolution. Iron regulatory protein 1 (IRP1) is a bifunctional protein with activity as an RNA-binding protein or as a cytoplasmic aconitase. Interconversion of IRP1 between these mutually exclusive states is central to cellular iron regulation and is accomplished through iron-responsive assembly and disassembly of a [4Fe–4S] cluster. When in its apo form, IRP1 binds to iron responsive elements (IREs) found in mRNAs encoding proteins of iron storage and transport and either prevents translation or degradation of the bound mRNA. Excess cellular iron stimulates the assembly of a [4Fe–4S] cluster in IRP1, inhibiting its IRE-binding ability and converting it to an aconitase. The three-dimensional structure of IRP1 in its different active forms will provide details of the interconversion process and clarify the selective recognition of mRNA, Fe–S sites and catalytic activity. To this end, the apo form of IRP1 bound to a ferritin IRE was crystallized. Crystals belong to the monoclinic space group P2 1 , with unit-cell parameters a = 109.6, b = 80.9, c = 142.9 Å, β = 92.0°. Native data sets have been collected from several crystals with resolution extending to 2.8 Å and the structure has been solved by molecular replacement

  1. 18 CFR 286.108 - Determination.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Determination. 286.108 Section 286.108 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT... Contested Audit Findings and Proposed Remedies § 286.108 Determination. If no formal hearing is had the...

  2. Automated Identification of Core Regulatory Genes in Human Gene Regulatory Networks.

    Directory of Open Access Journals (Sweden)

    Vipin Narang

    Full Text Available Human gene regulatory networks (GRN can be difficult to interpret due to a tangle of edges interconnecting thousands of genes. We constructed a general human GRN from extensive transcription factor and microRNA target data obtained from public databases. In a subnetwork of this GRN that is active during estrogen stimulation of MCF-7 breast cancer cells, we benchmarked automated algorithms for identifying core regulatory genes (transcription factors and microRNAs. Among these algorithms, we identified K-core decomposition, pagerank and betweenness centrality algorithms as the most effective for discovering core regulatory genes in the network evaluated based on previously known roles of these genes in MCF-7 biology as well as in their ability to explain the up or down expression status of up to 70% of the remaining genes. Finally, we validated the use of K-core algorithm for organizing the GRN in an easier to interpret layered hierarchy where more influential regulatory genes percolate towards the inner layers. The integrated human gene and miRNA network and software used in this study are provided as supplementary materials (S1 Data accompanying this manuscript.

  3. Preliminary Monthly Climatological Summaries

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Preliminary Local Climatological Data, recorded since 1970 on Weather Burean Form 1030 and then National Weather Service Form F-6. The preliminary climate data pages...

  4. Strengthening Regulatory Competence in Pakistan

    International Nuclear Information System (INIS)

    Sadiq, M.

    2016-01-01

    Capacity building of Pakistan Nuclear Regulatory Authority is considered an essential element in pursuit of its vision to become a world class regulatory body. Since its inception in 2001, PNRA has continuously endeavoured to invest in its people, develop training infrastructure and impart sound knowledge and professional skills with the aim to improve its regulatory effectiveness. The use of nuclear and radioactive material in Pakistan has increased manifold in recent years, thus induction of more manpower was needed for regulatory oversight. PNRA adopted two pronged approach for meeting the manpower demand (a) employment of university graduates through fast track recruitment drive and (b) induction of graduates by offering fellowships for Master degree programs. Although, the newly employed staff was selected on the basis of their excellent academic qualifications in basic and applied sciences, but they required rigorous knowledge and skills in regulatory perspectives. In order to implement a structured training program, PNRA conducted Training Needs Assessment (TNA) and identified competency gaps of the regulatory staff in legal, technical, regulatory practice and behavioural domains. PNRA took several initiatives for capacity building which included establishment of a training centre for sustainability of trainings, initiation of a fellowship scheme for Master program, attachment of staff at local institutes for on-the-job training and placement at foreign regulatory bodies and organizations for technical development with the assistance of IAEA. The above strategies have been very beneficial in competence building of the PNRA staff to perform all regulatory activities indigenously for nuclear power plants, research reactors and radiation facilities. Provision of vibrant technical support to IAEA and Member States in various programs by PNRA is a landmark of these competence development efforts. This paper summarizes PNRA initiatives and the International Atomic

  5. Proposed criteria for determining enforcement actions in the regulation of nuclear power plants

    International Nuclear Information System (INIS)

    Amparo, O.L.

    1982-01-01

    This document describes an approach for determining regulatory enforcement actions that would serve as basis for the maintenance of a license. Enforcement actions are determined according to defined severity of violations or failure by the licensee to meet regulatory requirements and license conditions. (ELC)

  6. The Political Economy of Regulatory Risk

    OpenAIRE

    Strausz, Roland

    2009-01-01

    I investigate the argument that, in a two–party system with different regulatory objectives, political uncertainty generates regulatory risk. I show that this risk has a fluctuation effect that hurts both parties and an output–expansion effect that benefits one party. Consequently, at least one party dislikes regulatory risk. Moreover, both political parties gain from eliminating regulatory risk when political divergence is small or the winning probability of the regulatory–risk–averse party ...

  7. Reduction of regulatory risk: a network economic approach

    OpenAIRE

    Knieps, Günter; Weiß, Hans-Jörg

    2007-01-01

    Several definitions of regulatory risk are known from the literature. From the perspective of regulatory reform it is important to differentiate between the impact of a given regulatory scheme on the firm's risk exposure and the risk arising from discretionary behavior of regulatory agencies. Whereas the conse-quences of effective regulation in principle are known and accepted, excessive regulatory discretion may cause a strong need for regulatory reform. Regulatory reform focussing on the re...

  8. Pressurized liquid extracts from Spirulina platensis microalga. Determination of their antioxidant activity and preliminary analysis by micellar electrokinetic chromatography.

    Science.gov (United States)

    Herrero, Miguel; Ibáñez, Elena; Cifuentes, Alejandro; Señoráns, Javier

    2004-08-27

    In this work, different extracts from the microalga Spirulina platensis are obtained using pressurized liquid extraction (PLE) and four different solvents (hexane, light petroleum, ethanol and water). Different extraction temperatures (115 and 170 degrees C) were tested using extraction times ranging from 9 to 15 min. The antioxidant activity of the different extracts is determined by means of an in vitro assay using a free radical method. Moreover, a new and fast method is developed using micellar electrokinetic chromatography with diode array detection (MEKC-DAD) to provide a preliminary analysis on the composition of the extracts. This combined application (i.e., in vitro assays plus MEKC-DAD) allowed the fast characterization of the extracts based on their antioxidant activity and the UV-vis spectra of the different compounds found in the extracts. To our knowledge, this work shows for the first time the great possibilities of the combined use of PLE-in vitro assay-MEKC-DAD to investigate natural sources of antioxidants.

  9. Determination of radon in soil and water in parts of Accra, and generation of preliminary radon map for Ghana

    International Nuclear Information System (INIS)

    Osei, Peter

    2016-07-01

    The research was focused on determining the radon levels in soil and water in parts of Accra, generate a preliminary radon map for Ghana and estimate a pilot reference level for the country, using the data obtained from this research and collated data from other researchers. The radon gas measurement was done with the passive method, using the SSNTDs which are sensitive to alpha particles emitted by radon. Cellulose nitrate LR – 115 type II alpha particle detectors were used. The detectors were chemically etched in a 2.5 M NaOH solution at a temperature of 60 °C for 90 minutes, after two weeks and two months of exposure to soil and water respectively. The images of the etched detectors were acquired by means of a scanner and then tracks counted with ImageJ software. Inverse Distance Weighing (IDW) method of ArcGIS 10.2 was used to spatially distribute the radon concentration on a map. The average soil radon concentration in the study area ranges from 0.191 kBqm"-"3 to 3.416 kBqm"-"3 with a mean of 1.193 kBqm"-"3. The radon concentration in water from the study area ranges from 0.00346 BqL"-"1 to 0.00538 BqL"-"1 with an average of 0.00456 BqL"-"1. A strong negative correlation has been established between radon in soil and water in the study area. The preliminary national average indoor, water and soil radon concentrations are 137 Bqm"-"3, 361.93 Bqm"-"3 and 3716.74 Bqm"-"3 respectively. The average levels of water and indoor radon exceeded WHO’s reference level of 100 Bqm"-"3. Accordingly, the pilot national indoor radon reference level for Ghana is set as 200 Bqm"-"3. (au)

  10. 75 FR 22868 - Withdrawal of Regulatory Guide

    Science.gov (United States)

    2010-04-30

    ...'s public Web site under ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections . Regulatory guides are also available for inspection at the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2010-0167] Withdrawal of Regulatory Guide AGENCY: Nuclear...

  11. National legislative and regulatory activities

    International Nuclear Information System (INIS)

    2016-01-01

    This section treats of the following National legislative and regulatory activities: 1 - France: General legislation, regulations and instruments; Nuclear trade (including non-proliferation); International co-operation; 2 - India: Licensing and regulatory infrastructure; Liability and compensation; 3 - Ireland: Nuclear safety and radiological protection (including nuclear emergency planning); Transport of radioactive material; Nuclear trade (including non-proliferation); 4 - Lithuania: Licensing and regulatory infrastructure; Nuclear safety and radiological protection (including nuclear emergency planning); Radioactive waste management; 5 - Luxembourg: Nuclear safety and radiological protection (including nuclear emergency planning); 6 - Slovak Republic: International co-operation; General legislation, regulations and instruments; 7 - Spain: Radioactive materials (including physical protection); Radioactive waste management; 8 - United States: Licensing and regulatory infrastructure

  12. 76 FR 24539 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-05-02

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . Electronic copies... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  13. A global regulatory science agenda for vaccines.

    Science.gov (United States)

    Elmgren, Lindsay; Li, Xuguang; Wilson, Carolyn; Ball, Robert; Wang, Junzhi; Cichutek, Klaus; Pfleiderer, Michael; Kato, Atsushi; Cavaleri, Marco; Southern, James; Jivapaisarnpong, Teeranart; Minor, Philip; Griffiths, Elwyn; Sohn, Yeowon; Wood, David

    2013-04-18

    The Decade of Vaccines Collaboration and development of the Global Vaccine Action Plan provides a catalyst and unique opportunity for regulators worldwide to develop and propose a global regulatory science agenda for vaccines. Regulatory oversight is critical to allow access to vaccines that are safe, effective, and of assured quality. Methods used by regulators need to constantly evolve so that scientific and technological advances are applied to address challenges such as new products and technologies, and also to provide an increased understanding of benefits and risks of existing products. Regulatory science builds on high-quality basic research, and encompasses at least two broad categories. First, there is laboratory-based regulatory science. Illustrative examples include development of correlates of immunity; or correlates of safety; or of improved product characterization and potency assays. Included in such science would be tools to standardize assays used for regulatory purposes. Second, there is science to develop regulatory processes. Illustrative examples include adaptive clinical trial designs; or tools to analyze the benefit-risk decision-making process of regulators; or novel pharmacovigilance methodologies. Included in such science would be initiatives to standardize regulatory processes (e.g., definitions of terms for adverse events [AEs] following immunization). The aim of a global regulatory science agenda is to transform current national efforts, mainly by well-resourced regulatory agencies, into a coordinated action plan to support global immunization goals. This article provides examples of how regulatory science has, in the past, contributed to improved access to vaccines, and identifies gaps that could be addressed through a global regulatory science agenda. The article also identifies challenges to implementing a regulatory science agenda and proposes strategies and actions to fill these gaps. A global regulatory science agenda will enable

  14. 75 FR 42170 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-07-20

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0425] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  15. 75 FR 48381 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-10

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0274] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide...

  16. International Nuclear Safety Experts Conclude IAEA Peer Review of Swiss Regulatory Framework

    International Nuclear Information System (INIS)

    2011-01-01

    equipment and safety procedures and adopting current technology to maximize nuclear safety; ENSI demonstrates openness and transparency by posting significant documents on its website, including reports on safety research, applicable lessons from foreign nuclear power plants, and safety assessments for all Swiss nuclear power plants; and ENSI's comprehensive and user friendly management system enables the regulator to work effectively and efficiently to oversee Swiss nuclear safety. The IRRS team also made recommendations to improve the Swiss regulatory system, including the following: As ENSI was established as an independent regulatory body in 2009 as part of a revised government framework, the Swiss government should actively monitor how this new framework is working and make improvements as needed; ENSI needs the authority to set conditions for licensing nuclear activities and to issue regulatory requirements; and The Swiss regulatory framework should continue evolving its graded approach to safety, and further develop its inspection efforts in all areas, especially in waste, decommissioning and transport. In a preliminary report, the IAEA has conveyed the team's main conclusions to ENSI, and a final report will be submitted to the authority in about three months. ENSI has told the team that it will make the report public. The IAEA encourages nations to invite a follow-up IRRS mission about two years after the full mission has been completed. About IRRS Missions IRRS missions are designed to strengthen and enhance the effectiveness of the national nuclear regulatory infrastructure of States, while recognizing the ultimate responsibility of each State to ensure safety in this area. This is done through consideration of both regulatory, technical and policy issues, with comparisons against IAEA safety standards and, where appropriate, good practices elsewhere. More information about IRRS missions is available on the IAEA Website. Quick Facts: 2 PWRs at Beznau; 1 PWR at

  17. Regulatory and licensee surveys

    International Nuclear Information System (INIS)

    2009-01-01

    Prior to the workshop two CSNI/WGHOF surveys were distributed. One survey was directed at regulatory bodies and the other was directed at plant licensees. The surveys were: 1 - Regulatory Expectations of Licensees' Arrangements to Ensure Suitable Organisational Structure, Resources and Competencies to Manage Safety (sent to WGHOF regulatory members). The survey requested that the respondents provide a brief overview of the situation related to plant organisations in their country, their regulatory expectations and their formal requirements. The survey addressed three subjects: the demonstration and documentation of organisational structures, resources and competencies, organisational changes, issues for improvement (for both current and new plants). Responses were received from eleven regulatory bodies. 2 - Approaches to Justify Organisational Suitability (sent to selected licensees). The purpose of the survey to was to gain an understanding of how licensees ensure organisational suitability, resources and competencies. This information was used to assist in the development of the issues and subjects that were addressed at the group discussion sessions. Responses were received from over fifteen licensees from nine countries. The survey requested that the licensees provide information on how they ensure effective organisational structures at their plants. The survey grouped the questions into the following four categories: organisational safety functions, resource and competence, decision-making and communication, good examples and improvement needs. The findings from these surveys were used in conjunction with other factors to identify the key issues for the workshop discussion sessions. The responses from these two surveys are discussed briefly in Sections 4 and 5 of this report. More extensive reviews of the regulatory and licensee responses are provided in Appendix 1

  18. 12 CFR 914.1 - Regulatory Report defined.

    Science.gov (United States)

    2010-01-01

    ... Bank. (b) Examples. Regulatory Report includes: (1) Call reports and reports of instrument-level risk... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Regulatory Report defined. 914.1 Section 914.1... DATA AVAILABILITY AND REPORTING § 914.1 Regulatory Report defined. (a) Definition. Regulatory Report...

  19. A Preliminary Assessment of Groundwater Samples around a Filling ...

    African Journals Online (AJOL)

    This paper is a preliminary assessment of groundwater samples around a filling station in Diobu area of Port Harcourt for four years at intervals of two years with a view to determine the level of groundwater pollution. It examines the physiochemical, major ions and heavy metal aspect of groundwater quality around the study ...

  20. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  1. A preliminary analysis of the reactor-based plutonium disposition alternative deployment schedules

    International Nuclear Information System (INIS)

    Zurn, R.M.

    1997-09-01

    This paper discusses the preliminary analysis of the implementation schedules of the reactor-based plutonium disposition alternatives. These schedule analyses are a part of a larger process to examine the nine decision criteria used to determine the most appropriate method of disposing of U.S. surplus weapons plutonium. The preliminary analysis indicates that the mission durations for the reactor-based alternatives range from eleven years to eighteen years and the initial mission fuel assemblies containing surplus weapons-usable plutonium could be loaded into the reactors between nine and fourteen years after the Record of Decision

  2. Systematic identification and characterization of regulatory elements derived from human endogenous retroviruses.

    Directory of Open Access Journals (Sweden)

    Jumpei Ito

    2017-07-01

    Full Text Available Human endogenous retroviruses (HERVs and other long terminal repeat (LTR-type retrotransposons (HERV/LTRs have regulatory elements that possibly influence the transcription of host genes. We systematically identified and characterized these regulatory elements based on publicly available datasets of ChIP-Seq of 97 transcription factors (TFs provided by ENCODE and Roadmap Epigenomics projects. We determined transcription factor-binding sites (TFBSs using the ChIP-Seq datasets and identified TFBSs observed on HERV/LTR sequences (HERV-TFBSs. Overall, 794,972 HERV-TFBSs were identified. Subsequently, we identified "HERV/LTR-shared regulatory element (HSRE," defined as a TF-binding motif in HERV-TFBSs, shared within a substantial fraction of a HERV/LTR type. HSREs could be an indication that the regulatory elements of HERV/LTRs are present before their insertions. We identified 2,201 HSREs, comprising specific associations of 354 HERV/LTRs and 84 TFs. Clustering analysis showed that HERV/LTRs can be grouped according to the TF binding patterns; HERV/LTR groups bounded to pluripotent TFs (e.g., SOX2, POU5F1, and NANOG, embryonic endoderm/mesendoderm TFs (e.g., GATA4/6, SOX17, and FOXA1/2, hematopoietic TFs (e.g., SPI1 (PU1, GATA1/2, and TAL1, and CTCF were identified. Regulatory elements of HERV/LTRs tended to locate nearby and/or interact three-dimensionally with the genes involved in immune responses, indicating that the regulatory elements play an important role in controlling the immune regulatory network. Further, we demonstrated subgroup-specific TF binding within LTR7, LTR5B, and LTR5_Hs, indicating that gains or losses of the regulatory elements occurred during genomic invasions of the HERV/LTRs. Finally, we constructed dbHERV-REs, an interactive database of HERV/LTR regulatory elements (http://herv-tfbs.com/. This study provides fundamental information in understanding the impact of HERV/LTRs on host transcription, and offers insights into

  3. Effects of natalizumab treatment on Foxp3+ T regulatory cells.

    Science.gov (United States)

    Stenner, Max-Philipp; Waschbisch, Anne; Buck, Dorothea; Doerck, Sebastian; Einsele, Hermann; Toyka, Klaus V; Wiendl, Heinz

    2008-10-06

    Natalizumab, a monoclonal humanized antibody targeting the alpha-4 chain of very late activation antigen 4 (VLA-4) exerts impressive therapeutic effects in patients with relapsing-remitting multiple sclerosis. Our objective was to study impacts of Natalizumab therapy on Foxp3+ T regulatory cells (Tregs) in multiple sclerosis (MS) patients. A combined approach of in vitro and ex vivo experiments using T cells isolated from the peripheral blood of healthy donors and Natalizumab treated MS patients was chosen. We determined binding of Natalizumab and its effects on the frequency, transmigratory behaviour and suppressive function of Tregs. Binding of Natalizumab and expression of CD49d (alpha-4 chain of VLA-4) differed between non-regulatory and regulatory cells. Albeit Foxp3+ Tregs had lower levels of CD49d, Natalizumab blocked the transmigration of Foxp3+ Tregs similar to non-regulatory T cells. The frequency of peripheral blood Tregs was unaffected by Natalizumab treatment. Natalizumab does not alter the suppressive capacity of CD4+CD25(high)CD127(low)Foxp3+ Tregs under in vitro conditions. Furthermore, the impaired function of Tregs in MS patients is not restored by Natalizumab treatment. We provide a first detailed analysis of Natalizumab effects on the regulatory T cell population. Our prospective study shows that Foxp3+ Tregs express lower levels of VLA-4 and bind less Natalizumab. We further the understanding of the mechanisms of action of Natalizumab by demonstrating that unlike other immunomodulatory drugs the beneficial therapeutic effects of the monoclonal antibody are largely independent of alterations in Treg frequency or function.

  4. Regulatory pathways for vaccines for developing countries.

    Science.gov (United States)

    Milstien, Julie; Belgharbi, Lahouari

    2004-01-01

    Vaccines that are designed for use only in developing countries face regulatory hurdles that may restrict their use. There are two primary reasons for this: most regulatory authorities are set up to address regulation of products for use only within their jurisdictions and regulatory authorities in developing countries traditionally have been considered weak. Some options for regulatory pathways for such products have been identified: licensing in the country of manufacture, file review by the European Medicines Evaluation Agency on behalf of WHO, export to a country with a competent national regulatory authority (NRA) that could handle all regulatory functions for the developing country market, shared manufacturing and licensing in a developing country with competent manufacturing and regulatory capacity, and use of a contracted independent entity for global regulatory approval. These options have been evaluated on the basis of five criteria: assurance of all regulatory functions for the life of the product, appropriateness of epidemiological assessment, applicability to products no longer used in the domestic market of the manufacturing country, reduction of regulatory risk for the manufacturer, and existing rules and regulations for implementation. No one option satisfies all criteria. For all options, national infrastructures (including the underlying regulatory legislative framework, particularly to formulate and implement local evidence-based vaccine policy) must be developed. WHO has led work to develop this capacity with some success. The paper outlines additional areas of action required by the international community to assure development and use of vaccines needed for the developing world. PMID:15042235

  5. The development of AECB regulatory documents

    International Nuclear Information System (INIS)

    Joyce, M.

    1981-01-01

    This document describes the Atomic Energy Control Board's (AECB) approach to the development and preparation of regulatory documents. The principal factors that have shaped the AECB'a regulatory approach are identified as background to the evolution of regulatory documents as are a number of current influences that affect the present and future development of these documents. Also described are the process by which regulatory documents are prepared and published and the points of contact between this process and the Canadian Standards Association program for nuclear standards. (author)

  6. Review of decision methodologies for evaluating regulatory actions affecting public health and safety

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; McDonald, C.L.; Schilling, A.H.

    1976-12-01

    This report examines several aspects of the problems and choices facing the governmental decision maker who must take regulatory actions with multiple decision objectives and attributes. Particular attention is given to the problems facing the U.S. Nuclear Regulatory Commission (NRC) and to the decision attribute of chief concern to NRC, the protection of human health and safety, with emphasis on nuclear power plants. The study was undertaken to provide background information for NRC to use in refining its process of value/impact assessment of proposed regulatory actions. The principal conclusion is that approaches to rationally consider the value and impact of proposed regulatory actions are available. These approaches can potentially improve the decision-making process and enable the agency to better explain and defend its decisions. They also permit consistent examination of the impacts, effects of uncertainty and sensitivity to various assumptions of the alternatives being considered. Finally, these approaches can help to assure that affected parties are heard and that technical information is used appropriately and to the extent possible. The principal aspects of the regulatory decision problem covered in the report are: the legal setting for regulatory decisions which affect human health and safety, elements of the decision-making process, conceptual approaches to decision making, current approaches to decision making in several Federal agencies, and the determination of acceptable risk levels

  7. Regulatory inspection of BARC facilities

    International Nuclear Information System (INIS)

    Rajdeep; Jayarajan, K.

    2017-01-01

    Nuclear and radiation facilities are sited, constructed, commissioned, operated and decommissioned, in conformity with the current safety standards and codes. Regulatory bodies follow different means to ensure compliance of the standards for the safety of the personnel, the public and the environment. Regulatory Inspection (RI) is one of the important measures employed by regulatory bodies to obtain the safety status of a facility or project and to verify the fulfilment of the conditions stipulated in the consent

  8. Regulatory aspects of the use of PSA to evaluate technical specifications

    International Nuclear Information System (INIS)

    Rumpf, J.

    1991-01-01

    Based on experiences gained in PSA activities the regulatory body of the GDR initiated a programme to investigate the feasibility of using PSA for the evaluation of technical specifications. This programme is just under work. In addition, to improve PSA, the GDR takes part in a programme which is aimed at performing plant specific level 1, PSA as well as and which enables operating organizations to carry out PSA on their own. The most important of some preliminary general findings presented in this paper are: - Technical specifications form a well established envelope of operational conditions and procedures. A total re-evaluation is not considered necessary; Probabilistic evaluation of technical specifications should be an integrated part of PSA activities (at least level 1). Single assessment is not considered reasonable; Probabilistic evaluation of technical specifications has to be based on plant specific information and realistic accident sequence calculations; Up to now no quantitative probabilistic criteria for technical specifications have been established. (author)

  9. 40 CFR 92.6 - Regulatory structure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Regulatory structure. 92.6 Section 92... Regulations for Locomotives and Locomotive Engines § 92.6 Regulatory structure. This section provides an overview of the regulatory structure of this part. (a) The regulations of this part 92 are intended to...

  10. 40 CFR 94.6 - Regulatory structure.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Regulatory structure. 94.6 Section 94... for Compression-Ignition Marine Engines § 94.6 Regulatory structure. This section provides an overview of the regulatory structure of this part. (a) The regulations of this Part 94 are intended to control...

  11. Regulatory hotspots in the malaria parasite genome dictate transcriptional variation.

    Directory of Open Access Journals (Sweden)

    Joseph M Gonzales

    2008-09-01

    Full Text Available The determinants of transcriptional regulation in malaria parasites remain elusive. The presence of a well-characterized gene expression cascade shared by different Plasmodium falciparum strains could imply that transcriptional regulation and its natural variation do not contribute significantly to the evolution of parasite drug resistance. To clarify the role of transcriptional variation as a source of stain-specific diversity in the most deadly malaria species and to find genetic loci that dictate variations in gene expression, we examined genome-wide expression level polymorphisms (ELPs in a genetic cross between phenotypically distinct parasite clones. Significant variation in gene expression is observed through direct co-hybridizations of RNA from different P. falciparum clones. Nearly 18% of genes were regulated by a significant expression quantitative trait locus. The genetic determinants of most of these ELPs resided in hotspots that are physically distant from their targets. The most prominent regulatory locus, influencing 269 transcripts, coincided with a Chromosome 5 amplification event carrying the drug resistance gene, pfmdr1, and 13 other genes. Drug selection pressure in the Dd2 parental clone lineage led not only to a copy number change in the pfmdr1 gene but also to an increased copy number of putative neighboring regulatory factors that, in turn, broadly influence the transcriptional network. Previously unrecognized transcriptional variation, controlled by polymorphic regulatory genes and possibly master regulators within large copy number variants, contributes to sweeping phenotypic evolution in drug-resistant malaria parasites.

  12. Sex determination mechanisms in the Calliphoridae (blow flies).

    Science.gov (United States)

    Scott, M J; Pimsler, M L; Tarone, A M

    2014-01-01

    The Calliphoridae or blow flies are a family of insects that occupy diverse habitats and perform important ecological roles, particularly the decomposition of animal remains. Some Calliphoridae species are also important in the forensic sciences, in agriculture (e.g. as livestock pests) and in medicine (e.g. maggot therapy). Calliphoridae provide striking examples in support of the hypothesis that sex determination regulatory gene hierarchies evolve in the reverse order, with the gene at the top being the most recently added. Unlike the model fly Drosophila melanogaster, where sex is determined by the number of X chromosomes, in the Australian sheep blow fly (Lucilia cuprina) sex is determined by a Y-linked male-determining gene (M). A different regulatory system appears to operate in the hairy maggot blow fly (Chrysomya rufifacies) where the maternal genotype determines sex. It is hypothesized that females heterozygous for a dominant female-determining factor (F/f) produce only female offspring and homozygous f/f females produce only sons. The bottom of the regulatory hierarchy appears to be the same in D. melanogaster and L. cuprina, with sex-specific splicing of doublesex transcripts being controlled by the female-specific Transformer (TRA) protein. We discuss a model that has been proposed for how tra transcripts are sex-specifically spliced in calliphorids, which is very different from D. melanogaster. © 2013 S. Karger AG, Basel.

  13. ENSI’s regulatory framework strategy

    International Nuclear Information System (INIS)

    2015-03-01

    This short brochure issued by the Swiss Federal Nuclear Safety Inspectorate ENSI defines the organisation’s regulatory framework strategy. Six guiding principles are declared and discussed: Comprehensive harmonisation with relevant international requirements, basing the regulatory framework on existing, tried-and-tested regulations, issuing of its own guidelines only when it is necessary to do so, guidelines to be drawn up transparently and with the involvement of all stakeholders and basing the level of detail of its regulatory framework on hazard potential and risk

  14. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    International Nuclear Information System (INIS)

    Grabaskas, David; Bucknor, Matthew; Jerden, James; Brunett, Acacia J.

    2016-01-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  15. 75 FR 80556 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2010-12-22

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate... Rule 19b-4 thereunder,\\2\\ notice is hereby given that on December 13, 2010, Financial Industry... application by their terms. For more information about the rulebook consolidation process, see Information...

  16. 75 FR 43588 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving a...

    Science.gov (United States)

    2010-07-26

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving a Proposed Rule... FINRA Rule 4320 in the Consolidated FINRA Rulebook July 20, 2010. On May 21, 2010, the Financial... application by their terms. For more information about the rulebook consolidation process, see Information...

  17. 76 FR 67675 - Notice of Preliminary Determination of Sales at Less Than Fair Value, Postponement of Final...

    Science.gov (United States)

    2011-11-02

    .... Should Samsung provide the Department with that information in a timely fashion, we intend to use it for... Coils From Japan: Preliminary Results of Antidumping Duty Administrative Review, 74 FR 39615 (August 7, 2009), unchanged in Stainless Steel Sheet and Strip in Coils From Japan: Final Results of Antidumping...

  18. 75 FR 79049 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-12-17

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2008-0427] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 3.12...

  19. 75 FR 45173 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are... NUCLEAR REGULATORY COMMISSION [NRC-2008-0638] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.151...

  20. 76 FR 18262 - Notice of issuance of Regulatory Guide

    Science.gov (United States)

    2011-04-01

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0277] Notice of issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.44...

  1. 76 FR 14107 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-03-15

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0276] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.43...

  2. 76 FR 14108 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-03-15

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0275] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.50...

  3. BIPS-FS preliminary design, miscellaneous notes

    International Nuclear Information System (INIS)

    1976-01-01

    A compendium of flight system preliminary design internal memos and progress report extracts for the Brayton Isotope Power System Preliminary Design Review to be held July 20, 21, and 22, 1975 is presented. The purpose is to bring together those published items which relate only to the preliminary design of the Flight System, Task 2 of Phase I. This preliminary design effort was required to ensure that the Ground Demonstration System will represent the Flight System as closely as possible

  4. Criteria for waste-related risks to be below regulatory concern

    International Nuclear Information System (INIS)

    Trubatch, S.L.

    1986-01-01

    This paper describes and analyzes the criteria recently established by the US Court of Appeals for the District of Columbia Circuit for determining that a risk is de minimis, i.e., below regulatory concern (BRC), for the purpose of the Atomic Energy Act of 1954, as amended, 42 USC 2011 et seq. The court established these BRC criteria incidentally during its review of intervenors' challenge to the US Nuclear Regulatory Commission's (NRC's) issuance of an operating license for the Diablo Canyon Nuclear Power Plant. In the course of that licensing proceeding, the NRC had determined that its regulations did not require it to consider the complicating effects of earthquakes on emergency planning. Although the legal standard and its quantitation arose in the context of emergency planning, these criteria are equally applicable to waste-related risks cognizable under the Atomic Energy Act. These criteria imply that the NRC, when licensing a waste repository, need not consider the risk of a catastrophic accident having a frequency of occurrence of less than one chance in one hundred thousand per year

  5. Regulatory networks and connected components of the neutral space. A look at functional islands

    Science.gov (United States)

    Boldhaus, G.; Klemm, K.

    2010-09-01

    The functioning of a living cell is largely determined by the structure of its regulatory network, comprising non-linear interactions between regulatory genes. An important factor for the stability and evolvability of such regulatory systems is neutrality - typically a large number of alternative network structures give rise to the necessary dynamics. Here we study the discretized regulatory dynamics of the yeast cell cycle [Li et al., PNAS, 2004] and the set of networks capable of reproducing it, which we call functional. Among these, the empirical yeast wildtype network is close to optimal with respect to sparse wiring. Under point mutations, which establish or delete single interactions, the neutral space of functional networks is fragmented into ≈ 4.7 × 108 components. One of the smaller ones contains the wildtype network. On average, functional networks reachable from the wildtype by mutations are sparser, have higher noise resilience and fewer fixed point attractors as compared with networks outside of this wildtype component.

  6. 76 FR 67236 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-10-31

    ... a foreign financial institution, and as part of the corporate control transaction, the foreign... subsidiaries, both of which are U.S. non-broker-dealer financial institutions, and as part of the corporate...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate...

  7. 75 FR 29793 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2010-05-27

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate... (``Act'') \\1\\ and Rule 19b-4 thereunder,\\2\\ notice is hereby given that on May 4, 2010, Financial.... For more information about the rulebook consolidation process, see Information Notice, March 12, 2008...

  8. Annual Report 2008. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2009-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across four parts and seven annexes the activities developed by the organism during 2008. The main topic are: the organization and the activity of the ARN; the regulatory standards; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the occupational surveillance; the environmental monitoring; improved organizational and budgetary developments. Also, this publication have annexes with the following content: regulatory documents; regulatory guides; measurement and evaluation of the drinking water of Ezeiza.

  9. Annual Report 2007. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2008-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across tree parts and seven annexes the activities developed by the organism during 2007. The main topic are: the organization and the activity of the ARN; the regulatory standards; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the occupational surveillance; the environmental monitoring; improved organizational. Also, this publication have annexes with the following content: regulatory documents; inspections to medical, industrial and training installations; regulatory guides; measurement and evaluation of the drinking water of Ezeiza.

  10. IAEA Team Concludes Peer Review of Greece's Regulatory Framework for Radiation Safety

    International Nuclear Information System (INIS)

    2012-01-01

    ; and GEAC exhibits a strong commitment to education and training in radiation protection. The IRRS Review team identified issues warranting attention or in need of improvement, including: The Radiation Protection Regulations require updating to bring them in line with the current IAEA Safety Requirements. Consideration should be given to the adoption of a more flexible hierarchy of safety regulations; The nation's legal framework is dated, lacks the flexibility of a risk-based regulatory framework which provides for a graded approach to safety and has gaps particularly in respect of waste and decommissioning; A consolidated management system requires senior management commitment to allocate sufficient resources with the appropriate authority, and to actively involve all staff; and The prime responsibility for safety, the responsibilities of employers and workers with respect to occupational exposure, and responsibilities with respect to emergency preparedness and response need to be explicitly assigned in the legal and regulatory framework for safety. In a preliminary report, the IAEA has conveyed the team's main conclusions to GAEC, and a final report will be submitted to the commission in about three months. Background The IRRS team carried out a review of Greece's nuclear legal and regulatory framework for safety. The IRRS review addressed the facilities and activities regulated by GAEC which involve radiation sources in addition to the waste management facilities. The research reactor GRR-1 in the National Centre for Scientific Research ''Demokritos'' was out of the scope of this IRRS review but will be included in the follow-up mission. The mission took place from 20 to 30 May 2012 at the GAEC headquarters in Agia Paraskevi. A Press Conference was conducted at the end of the mission on 30 May. The IRRS team consisted of nine senior regulatory experts from nine IAEA Member States and five IAEA staff members. About IRRS Missions IRRS missions are designed to

  11. The role of regulatory council in the energy sector from the aspect of consumers' protection

    International Nuclear Information System (INIS)

    Banovac, E.; Pavlovic, D.; Boljesic, K.

    2003-01-01

    The consumers' protection legal base, with few factors of new legislative consumers' protection legislation in European Union, in the Law on Consumers' Protection, and in the set of the Croatian Energy Laws is shown in this paper. Special attention in this paper is paid on five factors of regulatory body's orientation to the consumers' protection field, which energy regulatory body's policy should be included. The model of consumers' protection in the energy sector is shown, with the scheme of Three-component interactive subsystems: basic legislation which is determined consumers' protection policy, planning activities for consumers' protection (short and long time plans), and performing activities for consumers' protection. Furthermore, the approach of consumers' protection in the energy sectors in European Union are described. The paper gives the model of consumers' protection in the Croatian energy sector, and Croatian Energy Regulatory Council' approach to this issue. The table, with the data of specific consumers' protection problems in practice, those the Croatian Energy Regulatory Council as a regulatory body have been settled, is shown.(author)

  12. 77 FR 38694 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2012-06-28

    ... matrix will be an effective means of assessing related fees. For instance, the proposed fee structure...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate... Organization's Statement of the Terms of the Substance of the Proposed Rule Change FINRA is proposing to amend...

  13. Risk literacy for scientists. Invitation to regulatory science

    International Nuclear Information System (INIS)

    Ono, Kyoko

    2012-01-01

    This paper discusses a regulatory science, which fills a gap between scientific knowledge and regulatory actions. The author provides examples of the regulatory science employed in chemical risk assessment, such as the linear non-threshold theory. In the regulatory science, scientific data as well as scientific reasoning based on scientific knowledge - or regulatory rules - should play an important role. It is important to recognize that the rules facilitate transparent decision making under conditions of uncertainty and time constraints. Furthermore, the development of traditional or pure science results in the validation of regulatory rules, and subsequently, the regulatory science procedure develops more systematically. The concept of this science should be understood by those engaged in governmental decision making. (author)

  14. Exploratory shaft facility preliminary designs - Permian Basin

    International Nuclear Information System (INIS)

    1983-09-01

    The purpose of the Preliminary Design Report, Permian Basin, is to provide a description of the preliminary design for an Exploratory Shaft Facility in the Permian Basin, Texas. This issue of the report describes the preliminary design for constructing the exploratory shaft using the Large Hole Drilling method of construction and outlines the preliminary design and estimates of probable construction cost. The Preliminary Design Report is prepared to complement and summarize other documents that comprise the design at the preliminary stage of completion, December 1982. Other design documents include drawings, cost estimates and schedules. The preliminary design drawing package, which includes the construction schedule drawing, depicts the descriptions in this report. For reference, a list of the drawing titles and corresponding numbers are included in the Appendix. The report is divided into three principal sections: Design Basis, Facility Description, and Construction Cost Estimate. 30 references, 13 tables

  15. Regulatory Impact Assessment (RIA and Rationality of Law – Legal Aspects

    Directory of Open Access Journals (Sweden)

    Jan Chmielewski

    2015-06-01

    Full Text Available Purpose: The fundamental aim of this article is to verify an assumption according to which the proper Regulatory Impact Assessment (RIA is a key factor in the rationality of law. Rational law is a law which is effective and able to realize and achieve social, economic and environmental aims determined and established by the lawmaker. Methodology: The scope of this paper – which determines its structure – encompasses the definition of RIA, including its specific (but non-legal forms such as benchmarking and evaluation. As far as we are concerned, these methods can provide – as a kind of Regulatory Impact Assessment a significant tool for measuring the rationality of regulations. Furthermore, the usefulness of benchmarking and evaluation has been recognised by representatives of jurisprudence. We will also explain the concept and the assumptions of the rationality of law on the grounds and in the light of the case law of the Polish Constitutional Tribunal and the Supreme Administrative Court. This should allow to countercheck the main thesis of this paper. The methodology encompasses primary legal methods such as literature, case law and legislation analysis. Findings: An indispensable condition of the rationality of law is actual elimination of irrational regulations which were not subjected to the Regulatory Impact Assessment. Practical implications: Although RIA is a problematic issue (in terms of its practical application,it is necessary to carry it out in order to assure the rationality of law. A good and desirable complement to Regulatory Impact Assessment are non-legal methods such as benchmarking and evaluation. Originality: Originality and value of this survey lies in taking into account the case law of the Polish Constitutional Tribunal and the Supreme Administrative Court. Additionally, this paper is original in that it considers non-legal methods in the examination of the rationality of law.

  16. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  17. Effects of natalizumab treatment on Foxp3+ T regulatory cells.

    Directory of Open Access Journals (Sweden)

    Max-Philipp Stenner

    Full Text Available BACKGROUND: Natalizumab, a monoclonal humanized antibody targeting the alpha-4 chain of very late activation antigen 4 (VLA-4 exerts impressive therapeutic effects in patients with relapsing-remitting multiple sclerosis. Our objective was to study impacts of Natalizumab therapy on Foxp3+ T regulatory cells (Tregs in multiple sclerosis (MS patients. METHODOLOGY: A combined approach of in vitro and ex vivo experiments using T cells isolated from the peripheral blood of healthy donors and Natalizumab treated MS patients was chosen. We determined binding of Natalizumab and its effects on the frequency, transmigratory behaviour and suppressive function of Tregs. PRINCIPAL FINDINGS: Binding of Natalizumab and expression of CD49d (alpha-4 chain of VLA-4 differed between non-regulatory and regulatory cells. Albeit Foxp3+ Tregs had lower levels of CD49d, Natalizumab blocked the transmigration of Foxp3+ Tregs similar to non-regulatory T cells. The frequency of peripheral blood Tregs was unaffected by Natalizumab treatment. Natalizumab does not alter the suppressive capacity of CD4+CD25(highCD127(lowFoxp3+ Tregs under in vitro conditions. Furthermore, the impaired function of Tregs in MS patients is not restored by Natalizumab treatment. CONCLUSIONS: We provide a first detailed analysis of Natalizumab effects on the regulatory T cell population. Our prospective study shows that Foxp3+ Tregs express lower levels of VLA-4 and bind less Natalizumab. We further the understanding of the mechanisms of action of Natalizumab by demonstrating that unlike other immunomodulatory drugs the beneficial therapeutic effects of the monoclonal antibody are largely independent of alterations in Treg frequency or function.

  18. 78 FR 68893 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2013-11-15

    ... that the size of the BBO equals the minimum quote size. Number of market makers actively quoting...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate Effectiveness of a Proposed Rule Change To Extend the Tier Size Pilot of FINRA Rule 6433 (Minimum Quotation Size...

  19. Characterization of the bovine pregnancy-associated glycoprotein gene family – analysis of gene sequences, regulatory regions within the promoter and expression of selected genes

    Directory of Open Access Journals (Sweden)

    Walker Angela M

    2009-04-01

    Full Text Available Abstract Background The Pregnancy-associated glycoproteins (PAGs belong to a large family of aspartic peptidases expressed exclusively in the placenta of species in the Artiodactyla order. In cattle, the PAG gene family is comprised of at least 22 transcribed genes, as well as some variants. Phylogenetic analyses have shown that the PAG family segregates into 'ancient' and 'modern' groupings. Along with sequence differences between family members, there are clear distinctions in their spatio-temporal distribution and in their relative level of expression. In this report, 1 we performed an in silico analysis of the bovine genome to further characterize the PAG gene family, 2 we scrutinized proximal promoter sequences of the PAG genes to evaluate the evolution pressures operating on them and to identify putative regulatory regions, 3 we determined relative transcript abundance of selected PAGs during pregnancy and, 4 we performed preliminary characterization of the putative regulatory elements for one of the candidate PAGs, bovine (bo PAG-2. Results From our analysis of the bovine genome, we identified 18 distinct PAG genes and 14 pseudogenes. We observed that the first 500 base pairs upstream of the translational start site contained multiple regions that are conserved among all boPAGs. However, a preponderance of conserved regions, that harbor recognition sites for putative transcriptional factors (TFs, were found to be unique to the modern boPAG grouping, but not the ancient boPAGs. We gathered evidence by means of Q-PCR and screening of EST databases to show that boPAG-2 is the most abundant of all boPAG transcripts. Finally, we provided preliminary evidence for the role of ETS- and DDVL-related TFs in the regulation of the boPAG-2 gene. Conclusion PAGs represent a relatively large gene family in the bovine genome. The proximal promoter regions of these genes display differences in putative TF binding sites, likely contributing to observed

  20. 75 FR 5630 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-02-03

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0031] Draft Regulatory Guide: Issuance, Availability... Guide, DG-4017. FOR FURTHER INFORMATION CONTACT: Gregory Chapman, U.S. Nuclear Regulatory Commission...

  1. Regulatory analysis technical evaluation handbook. Final report

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC's Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available

  2. Communication Regulatory Science: Mapping a New Field.

    Science.gov (United States)

    Noar, Seth M; Cappella, Joseph N; Price, Simani

    2017-12-13

    Communication regulatory science is an emerging field that uses validated techniques, tools, and models to inform regulatory actions that promote optimal communication outcomes and benefit the public. In the opening article to this special issue on communication and tobacco regulatory science, we 1) describe Food and Drug Administration (FDA) regulation of tobacco products in the US; 2) introduce communication regulatory science and provide examples in the tobacco regulatory science realm; and 3) describe the special issue process and final set of articles. Communication research on tobacco regulatory science is a burgeoning area of inquiry, and this work advances communication science, informs and potentially guides the FDA, and may help to withstand legal challenges brought by the tobacco industry. This research has the potential to have a major impact on the tobacco epidemic and population health by helping implement the most effective communications to prevent tobacco initiation and increase cessation. This special issue provides an example of 10 studies that exemplify tobacco regulatory science and demonstrate how the health communication field can affect regulation and benefit public health.

  3. Functional and topological characteristics of mammalian regulatory domains

    Science.gov (United States)

    Symmons, Orsolya; Uslu, Veli Vural; Tsujimura, Taro; Ruf, Sandra; Nassari, Sonya; Schwarzer, Wibke; Ettwiller, Laurence; Spitz, François

    2014-01-01

    Long-range regulatory interactions play an important role in shaping gene-expression programs. However, the genomic features that organize these activities are still poorly characterized. We conducted a large operational analysis to chart the distribution of gene regulatory activities along the mouse genome, using hundreds of insertions of a regulatory sensor. We found that enhancers distribute their activities along broad regions and not in a gene-centric manner, defining large regulatory domains. Remarkably, these domains correlate strongly with the recently described TADs, which partition the genome into distinct self-interacting blocks. Different features, including specific repeats and CTCF-binding sites, correlate with the transition zones separating regulatory domains, and may help to further organize promiscuously distributed regulatory influences within large domains. These findings support a model of genomic organization where TADs confine regulatory activities to specific but large regulatory domains, contributing to the establishment of specific gene expression profiles. PMID:24398455

  4. Regulatory mechanisms of apoptosis in regularly dividing cells

    Directory of Open Access Journals (Sweden)

    Ribal S Darwish

    2010-08-01

    Full Text Available Ribal S DarwishDepartment of Anesthesiology, Division of Critical Care Medicine, University of Maryland Medical Center, Baltimore, Maryland, USAAbstract: The balance between cell survival and death is essential for normal development and homeostasis of organisms. Apoptosis is a distinct type of cell death with ultrastructural features that are consistent with an active, inherently controlled process. Abnormalities and ­dysregulation of apoptosis contribute to the pathophysiology of multiple disease processes. Apoptosis is strictly regulated by several positive and negative feedback mechanisms that regulate cell death and determine the final outcome after cell exposure to apoptotic stimuli. Mitochondria and caspases are central components of the regulatory mechanisms of ­apoptosis. Recently, noncaspase pathways of apoptosis have been explored through the studies of ­apoptosis-inducing factor and endonuclease G. Multiple difficulties in the apoptosis research relate to apoptosis detection and imaging. This article reviews current understanding of the regulatory mechanisms of apoptosis.Keywords: caspases, apoptosis-inducing factor, apoptosis inhibitory proteins, cytochrome c, mitochondria 

  5. Annual Report 2010. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2010-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across six chapters and seven annexes the activities developed by the organism during 2010. The main topic are: institutional issues; regulatory guides and standards; argentinean nuclear regulatory system; quality assurance of the ARN; the institutional communications; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the safeguards and the physical protection; the environmental control; the institutional relations; the training and the public information. Also, this publication have annexes with the following content: the regulatory framework; regulatory documents; inspections to medical, industrial and training installations; measurement and evaluation of the drinking water of Ezeiza; international expert's report on the application of the international standards of radiological protection of the public in the zone of the Ezeiza Atomic Center; ethical code

  6. Annual Report 2011. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2011-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across six chapters and seven annexes the activities developed by the organism during 2011. The main topic are: institutional issues; regulatory guides and standards; argentinean nuclear regulatory system; quality assurance of the ARN; the institutional communications; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the safeguards and the physical protection; the environmental control; the institutional relations; the training and the public information. Also, this publication have annexes with the following content: the regulatory framework; regulatory documents; inspections to medical, industrial and training installations; measurement and evaluation of the drinking water of Ezeiza; international expert's report on the application of the international standards of radiological protection of the public in the zone of the Ezeiza Atomic Center; ethical code

  7. Development of regulatory policy for SMART-P

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S. H.; Lee, Y. H.; Moo, Philip; Koh, B. J.; Son, M. K.; Han, G. H.; Kim, D. H. [Korea Association for Nuclear Technology, Daejeon (Korea, Republic of)

    2004-06-15

    KAERI promoted the construction of a research reactor, SMART-P, the reduced scale of SMART, with intent to demonstrate the safety and performance of SMART. According to this progress, the development of regulatory process for SMART-P became necessary. The establishment of regulatory policy, based on the current regulatory guidelines as well as technical aspect, became essential matters. Considering the on-going small and medium size reactors in near future, the selection of the appropriate measure in the existing regulatory process to SMART-P is very important. Thus the schematic study for the applicable licensing procedure and regulatory requirements suitable for SMART-P is required.

  8. Development of regulatory policy for SMART-P

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S. H.; Moon, S. H.; Lee, Y. H.; Son, M. K.; Han, K. H.; Kim, D. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    2003-06-15

    KAERI promoted the construction of a research reactor, SMART-P, the reduced scale of SMART, with intent to demonstrate the safety and performance of SMART. According to this progress, the development of regulatory process for SMART-P became necessary. The establishment of regulatory policy, based on the current regulatory guidelines as well as technical aspect, became essential matters. Considering the on-going small and medium size reactors m near future, the selection of the appropriate measure in the existing regulatory process to SMART-P is very important. Thus the schematic study for the applicable licensing procedure and regulatory requirements suitable for SMART-P is required.

  9. Annual Report 2009. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2010-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across four parts and seven annexes the activities developed by the organism during 2009. The main topic are: the organization and the activity of the ARN; the regulatory standards; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the environmental monitoring; the occupational surveillance; the training and the public information; improved organizational and budgetary developments. Also, this publication have annexes with the following content: regulatory documents; inspections to medical, industrial and training installations; regulatory guides; measurement and evaluation of the drinking water of Ezeiza.

  10. Thymic versus induced regulatory T cells – who regulates the regulators?

    Directory of Open Access Journals (Sweden)

    Giovanni Antonio Maria Povoleri

    2013-06-01

    Full Text Available Physiological health must balance immunological responsiveness against foreign pathogens with tolerance towards self-components and commensals. Disruption of this balance causes autoimmune diseases/chronic inflammation, in case of excessive immune responses, and persistent infection/immunodeficiency if regulatory components are overactive. This homeostasis occurs at two different levels: at a resting state to prevent autoimmune disease, as autoreactive effector T-cells (Teffs are only partially deleted in the thymus, and during inflammation to prevent excessive tissue injury, contract the immune response and enable tissue repair. Adaptive immune cells with regulatory function (regulatory T-cells are essential to control Teffs. Two sets of regulatory T cell are required to achieve the desired control: those emerging de novo from embryonic/neonatal thymus (thymic or tTregs, whose function is to control autoreactive Teffs to prevent autoimmune diseases, and those induced in the periphery (peripheral or pTregs to acquire regulatory phenotype in response to pathogens/inflammation. The differentiation mechanisms of these cells determine their commitment to lineage and plasticity towards other phenotypes. tTregs, expressing high levels of IL-2 receptor alpha chain (CD25, and the transcription factor Foxp3, are the most important, since mutations or deletions in these genes cause fatal autoimmune diseases in both mice and men. In the periphery, instead, Foxp3+ pTregs can be induced from naïve precursors in response to environmental signals. Here, we discuss molecular signatures and induction processes, mechanisms and sites of action, lineage stability and differentiating characteristics of both Foxp3+ and Foxp3- populations of regulatory T cells, derived from the thymus or induced peripherally. We relate these predicates to programs of cell-based therapy for the treatment of autoimmune diseases and induction of tolerance to transplants.

  11. Regulatory risk assessments: Is there a need to reduce uncertainty and enhance robustness?

    Science.gov (United States)

    Snodin, D J

    2015-12-01

    A critical evaluation of several recent regulatory risk assessments has been undertaken. These relate to propyl paraben (as a food additive, cosmetic ingredient or pharmaceutical excipient), cobalt (in terms of a safety-based limit for pharmaceuticals) and the cancer Threshold of Toxicological Concern as applied to food contaminants and pharmaceutical impurities. In all cases, a number of concerns can be raised regarding the reliability of the current assessments, some examples being absence of data audits, use of single-dose and/or non-good laboratory practice studies to determine safety metrics, use of a biased data set and questionable methodology and lack of consistency with precedents and regulatory guidance. Drawing on these findings, a set of recommendations is provided to reduce uncertainty and improve the quality and robustness of future regulatory risk assessments. © The Author(s) 2015.

  12. Environmental Regulatory Update Table, December 1989

    International Nuclear Information System (INIS)

    Houlbert, L.M.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1990-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action

  13. Environmental regulatory update table, March 1989

    International Nuclear Information System (INIS)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-04-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action

  14. Environmental Regulatory Update Table, April 1989

    International Nuclear Information System (INIS)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action

  15. Environmental Regulatory Update Table, December 1991

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  16. Environmental Regulatory Update Table, August 1990

    International Nuclear Information System (INIS)

    Houlberg, L.M.; Nikbakht, A.; Salk, M.S.

    1990-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action

  17. Environmental Regulatory Update Table, October 1991

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  18. Environmental Regulatory Update Table, November 1991

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  19. Environmental Regulatory Update Table, September 1991

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Use of allele-specific FAIRE to determine functional regulatory polymorphism using large-scale genotyping arrays

    DEFF Research Database (Denmark)

    Smith, Frank Andrew; Howard, Philip; Shah, Sonia

    2012-01-01

    Following the widespread use of genome-wide association studies (GWAS), focus is turning towards identification of causal variants rather than simply genetic markers of diseases and traits. As a step towards a high-throughput method to identify genome-wide, non-coding, functional regulatory...... discrimination. Examination of this SNP in two prospective Caucasian cohorts comprising 15,000 individuals confirmed the association with HDL-C levels (combined beta = 0.016; p = 0.0006), and analysis of gene expression identified an allelic association with LXR-α expression in heart tissue. Using increasingly...

  1. Regulatory Control of Radiation Sources. Safety Guide (Arabic Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This Safety Guide is intended to assist States in implementing the requirements established in Safety Standards Series No. GS-R-1, Legal and Governmental Infrastructure for Nuclear, Radiation, Radioactive Waste and Transport Safety, for a national regulatory infrastructure to regulate any practice involving radiation sources in medicine, industry, research, agriculture and education. The Safety Guide provides advice on the legislative basis for establishing regulatory bodies, including the effective independence of the regulatory body. It also provides guidance on implementing the functions and activities of regulatory bodies: the development of regulations and guides on radiation safety; implementation of a system for notification and authorization; carrying out regulatory inspections; taking necessary enforcement actions; and investigating accidents and circumstances potentially giving rise to accidents. The various aspects relating to the regulatory control of consumer products are explained, including justification, optimization of exposure, safety assessment and authorization. Guidance is also provided on the organization and staffing of regulatory bodies. Contents: 1. Introduction; 2. Legal framework for a regulatory infrastructure; 3. Principal functions and activities of the regulatory body; 4. Regulatory control of the supply of consumer products; 5. Functions of the regulatory body shared with other governmental agencies; 6. Organization and staffing of the regulatory body; 7. Documentation of the functions and activities of the regulatory body; 8. Support services; 9. Quality management for the regulatory system.

  2. 78 FR 54502 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2013-09-04

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of a Proposed Rule... Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission (``SEC'' or ``Commission... or manipulative motivation for the trading activity at issue.\\4\\ Specifically, proposed Supplementary...

  3. 76 FR 63969 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2011-10-14

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of Amendment No. 1 to Proposed Rule Change To Adopt FINRA Rule 2231 (Customer Account Statements) in the Consolidated... Account Statements) in the Consolidated FINRA Rulebook (``Notice''). The Notice contained incorrect...

  4. IAEA Mission Concludes Peer Review of UK's Nuclear Regulatory Framework

    International Nuclear Information System (INIS)

    2013-01-01

    Full text: Senior international nuclear safety and radiation protection experts today concluded a ten-day International Atomic Energy Agency (IAEA) mission to review the regulatory framework for nuclear and radiation safety in the United Kingdom (UK). The Integrated Regulatory Review Service (IRRS) mission team said in its preliminary findings that the UK had made considerable progress since reviews in 2006 and 2009. It also identified good practices in the country's nuclear regulatory system. In addition to following up previous missions, a key objective was to review the effectiveness of the role of the Office of Nuclear Regulation (ONR), the UK's nuclear regulator, in ensuring the safety of radioactive waste management and decommissioning, occupational radiation protection, and public and environmental exposures, including emergency planning and response. The mission also considered the response of the UK's regulatory regime to the implications of the Fukushima Daichi accident had been timely and effective. Recommendations and suggestions were made to the ONR and the Government aimed at strengthening the effectiveness of the country's regulatory framework and functions in line with IAEA Safety Standards, the control of radioactive discharges and environmental monitoring. 'The staff of ONR is clearly dedicated to their mission to secure the protection of people and society from the hazards of the nuclear industry. I am confident that ONR will use the results of this mission to further enhance their regulatory programs', said Bill Borchardt, mission leader and former Executive Director of the United States Nuclear Regulatory Commission (NRC). 'The staff were open and cooperative in their discussions; they provided the fullest practicable assistance, and accepted advice from the Team for continuous improvement in their regulatory work'. ONR's Chief Executive, John Jenkins, said that the full report of the IRRS mission will enhance regulatory effectiveness in the UK

  5. 75 FR 52999 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-30

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition... NUCLEAR REGULATORY COMMISSION [NRC-2009-0556] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 8.35...

  6. 75 FR 45171 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ and through the NRC's Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2010-0072] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 3.13...

  7. 75 FR 37842 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-06-30

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition... NUCLEAR REGULATORY COMMISSION [NRC-2009-0396] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 2.5...

  8. 75 FR 43207 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-07-23

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0282] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.141...

  9. 75 FR 33361 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-06-11

    ....gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for inspection at the... NUCLEAR REGULATORY COMMISSION [NRC-2009-0308] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.28...

  10. 75 FR 16525 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-01

    ... http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2009-0413] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.11...

  11. 75 FR 27599 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-05-17

    ...'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2009-0492] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide 6.7...

  12. Data Center Energy Efficiency Standards in India: Preliminary Findings from Global Practices

    Energy Technology Data Exchange (ETDEWEB)

    Raje, Sanyukta; Maan, Hermant; Ganguly, Suprotim; Singh, Tanvin; Jayaram, Nisha; Ghatikar, Girish; Greenberg, Steve; Kumar, Satish; Sartor, Dale

    2015-06-01

    Global data center energy consumption is growing rapidly. In India, information technology industry growth, fossil-fuel generation, and rising energy prices add significant operational costs and carbon emissions from energy-intensive data centers. Adoption of energy-efficient practices can improve the global competitiveness and sustainability of data centers in India. Previous studies have concluded that advancement of energy efficiency standards through policy and regulatory mechanisms is the fastest path to accelerate the adoption of energy-efficient practices in the Indian data centers. In this study, we reviewed data center energy efficiency practices in the United States, Europe, and Asia. Using evaluation metrics, we identified an initial set of energy efficiency standards applicable to the Indian context using the existing policy mechanisms. These preliminary findings support next steps to recommend energy efficiency standards and inform policy makers on strategies to adopt energy-efficient technologies and practices in Indian data centers.

  13. 12 CFR 567.2 - Minimum regulatory capital requirement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Minimum regulatory capital requirement. 567.2... Regulatory Capital Requirements § 567.2 Minimum regulatory capital requirement. (a) To meet its regulatory capital requirement a savings association must satisfy each of the following capital standards: (1) Risk...

  14. A haploid genetic screen identifies the G1/S regulatory machinery as a determinant of Wee1 inhibitor sensitivity.

    Science.gov (United States)

    Heijink, Anne Margriet; Blomen, Vincent A; Bisteau, Xavier; Degener, Fabian; Matsushita, Felipe Yu; Kaldis, Philipp; Foijer, Floris; van Vugt, Marcel A T M

    2015-12-08

    The Wee1 cell cycle checkpoint kinase prevents premature mitotic entry by inhibiting cyclin-dependent kinases. Chemical inhibitors of Wee1 are currently being tested clinically as targeted anticancer drugs. Wee1 inhibition is thought to be preferentially cytotoxic in p53-defective cancer cells. However, TP53 mutant cancers do not respond consistently to Wee1 inhibitor treatment, indicating the existence of genetic determinants of Wee1 inhibitor sensitivity other than TP53 status. To optimally facilitate patient selection for Wee1 inhibition and uncover potential resistance mechanisms, identification of these currently unknown genes is necessary. The aim of this study was therefore to identify gene mutations that determine Wee1 inhibitor sensitivity. We performed a genome-wide unbiased functional genetic screen in TP53 mutant near-haploid KBM-7 cells using gene-trap insertional mutagenesis. Insertion site mapping of cells that survived long-term Wee1 inhibition revealed enrichment of G1/S regulatory genes, including SKP2, CUL1, and CDK2. Stable depletion of SKP2, CUL1, or CDK2 or chemical Cdk2 inhibition rescued the γ-H2AX induction and abrogation of G2 phase as induced by Wee1 inhibition in breast and ovarian cancer cell lines. Remarkably, live cell imaging showed that depletion of SKP2, CUL1, or CDK2 did not rescue the Wee1 inhibition-induced karyokinesis and cytokinesis defects. These data indicate that the activity of the DNA replication machinery, beyond TP53 mutation status, determines Wee1 inhibitor sensitivity, and could serve as a selection criterion for Wee1-inhibitor eligible patients. Conversely, loss of the identified S-phase genes could serve as a mechanism of acquired resistance, which goes along with development of severe genomic instability.

  15. 78 FR 76280 - Polyethylene Retail Carrier Bags From the People's Republic of China: Affirmative Preliminary...

    Science.gov (United States)

    2013-12-17

    ... Bags From the People's Republic of China: Affirmative Preliminary Determination of Circumvention of the... determines that imports of unfinished polyethylene retail carrier bags (PRCBs) from the People's Republic of... Duty Order: Polyethylene Retail Carrier Bags From the People's Republic of China, 69 FR 48201 (August 9...

  16. The Regulatory Independence of FANR

    International Nuclear Information System (INIS)

    ALNuaimi, Fatema; Choi, Kwang Shik

    2012-01-01

    Regulatory independence is meant to provide a conservative system of policy making in order to comply with the problems that are forecasted upon the basis of assumptions. The Federal Authorization of Nuclear Regulation (FANR) is a regulatory commission that was formed to be regulatory body that governs the generation of nuclear power in United Arab Emirates. It was established under the UAE nuclear law (9/2009) as an independent regulatory body that was tasked with the regulation of all nuclear activities in the United Arab Emirates. As an independent body, FANR was tasked with ensuring that the regulation of the nuclear sector is done in effective and transparent manner to ensure its accountability to the people. Being independent, the regulatory body develops national nuclear regulations based on laid down safety standards by the International Atomic Energy Agency, ensuring that they are based on scientific and proven technologies The role of FANR is to ensure that the all corporations that undertake nuclear activities follow the laid down procedures and objectives and ensure safety measures are taken keenly to ensure the safety of the workers and the general public while at the same time ensuring the environment is free from nuclear radiations

  17. The Regulatory Independence of FANR

    Energy Technology Data Exchange (ETDEWEB)

    ALNuaimi, Fatema; Choi, Kwang Shik [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2012-05-15

    Regulatory independence is meant to provide a conservative system of policy making in order to comply with the problems that are forecasted upon the basis of assumptions. The Federal Authorization of Nuclear Regulation (FANR) is a regulatory commission that was formed to be regulatory body that governs the generation of nuclear power in United Arab Emirates. It was established under the UAE nuclear law (9/2009) as an independent regulatory body that was tasked with the regulation of all nuclear activities in the United Arab Emirates. As an independent body, FANR was tasked with ensuring that the regulation of the nuclear sector is done in effective and transparent manner to ensure its accountability to the people. Being independent, the regulatory body develops national nuclear regulations based on laid down safety standards by the International Atomic Energy Agency, ensuring that they are based on scientific and proven technologies The role of FANR is to ensure that the all corporations that undertake nuclear activities follow the laid down procedures and objectives and ensure safety measures are taken keenly to ensure the safety of the workers and the general public while at the same time ensuring the environment is free from nuclear radiations

  18. 75 FR 16202 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-03-31

    ... Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available... NUCLEAR REGULATORY COMMISSION [NRC-2008-0644] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide (RG) 1.126...

  19. 75 FR 81675 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-12-28

    ... through the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0031] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 4.16...

  20. 75 FR 20399 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-19

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0418] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 6.9...

  1. 76 FR 31382 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-05-31

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0287] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 8.2...

  2. CFD analyses in regulatory practice

    International Nuclear Information System (INIS)

    Bloemeling, F.; Pandazis, P.; Schaffrath, A.

    2012-01-01

    Numerical software is used in nuclear regulatory procedures for many problems in the fields of neutron physics, structural mechanics, thermal hydraulics etc. Among other things, the software is employed in dimensioning and designing systems and components and in simulating transients and accidents. In nuclear technology, analyses of this kind must meet strict requirements. Computational Fluid Dynamics (CFD) codes were developed for computing multidimensional flow processes of the type occurring in reactor cooling systems or in containments. Extensive experience has been accumulated by now in selected single-phase flow phenomena. At the present time, there is a need for development and validation with respect to the simulation of multi-phase and multi-component flows. As insufficient input by the user can lead to faulty results, the validity of the results and an assessment of uncertainties are guaranteed only through consistent application of so-called Best Practice Guidelines. The authors present the possibilities now available to CFD analyses in nuclear regulatory practice. This includes a discussion of the fundamental requirements to be met by numerical software, especially the demands upon computational analysis made by nuclear rules and regulations. In conclusion, 2 examples are presented of applications of CFD analysis to nuclear problems: Determining deboration in the condenser reflux mode of operation, and protection of the reactor pressure vessel (RPV) against brittle failure. (orig.)

  3. Management of the Regulatory Authority Information

    International Nuclear Information System (INIS)

    Suman, H.

    2003-01-01

    Safe Management of the Regulatory Authority Information is one of the essential elements to ensure the effectiveness of the regulatory program as a whole. This paper briefly describes the information management basis in RNRO, which is in charge of the regulatory authority tasks in Syria. SINA-2, a computational tool prepared in RNRO for managing the information related to the inventory of radiation sources and users, is also introduced

  4. Environmental Regulatory Update Table, August 1991

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M., Hawkins, G.T.; Salk, M.S.

    1991-09-01

    This Environmental Regulatory Update Table (August 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  5. Environmental regulatory update table, July 1991

    Energy Technology Data Exchange (ETDEWEB)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-08-01

    This Environmental Regulatory Update Table (July 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Mission Risk Reduction Regulatory Change Management

    Science.gov (United States)

    Scroggins, Sharon

    2007-01-01

    NASA Headquarters Environmental Management Division supports NASA's mission to pioneer the future in space exploration, scientific discovery, and aeronautics research by integrating environmental considerations into programs and projects early-on, thereby proactively reducing NASA's exposure to institutional, programmatic and operational risk. As part of this effort, NASA established the Principal Center for Regulatory Risk Analysis and Communication (RRAC PC) as a resource for detecting, analyzing, and communicating environmental regulatory risks to the NASA stakeholder community. The RRAC PC focuses on detecting emerging environmental regulations and other operational change drivers that may pose risks to NASA programs and facilities, and effectively communicating the potential risks. For example, regulatory change may restrict how and where certain activities or operations may be conducted. Regulatory change can also directly affect the ability to use certain materials by mandating a production phase-out or restricting usage applications of certain materials. Regulatory change can result in significant adverse impacts to NASA programs and facilities due to NASA's stringent performance requirements for materials and components related to human-rated space vehicles. Even if a regulation does not directly affect NASA operations, U.S. and international regulations can pose program risks indirectly through requirements levied on manufacturers and vendors of components and materials. For example, manufacturers can change their formulations to comply with new regulatory requirements. Such changes can require time-consuming and costly requalification certification for use in human spaceflight programs. The RRAC PC has implemented a system for proactively managing regulatory change to minimize potential adverse impacts to NASA programs and facilities. This presentation highlights the process utilized by the RRACPC to communicate regulatory change and the associated

  7. [Preliminary determination of organic pollutants in agricultural fertilizers].

    Science.gov (United States)

    Mo, Ce-hui; Li, Yun-hui; Cai, Quan-ying; Zeng, Qiao-yun; Wang, Bo-guang; Li, Hai-qin

    2005-05-01

    Organic pollutants such as polycyclic aromatic hydrocarbons (PAHs) in agricultural fertilizers are new problem deserved more study. Eight kinds of organic pollutants including 43 compounds classified as US EPA priority pollutants in twenty one agricultural fertilizers which were universally used in China were determined by Gas chromatography-mass spectrum (GC-MS). Three kinds of organic pollutants including more than 5 compounds were detected in most fertilizers, composing mainly of phthalic acid esters (PAEs), nitrobenzenes (NBs) and polycyclic aromatic hydrocarbons (PAHs). There were 26 compounds detected in at least one fertilizer, five of them especially PAEs detected in most fertilizer and even in all fertilizers. Benzo(a)pyrene, a strongly carcinogenic compound was detected in two fertilizers. Higher concentrations of compounds were determined in those fertilizers such as multifunction compound fertilizers and coated fertilizers.

  8. The Danish Regulatory Reform of Telecommunications

    DEFF Research Database (Denmark)

    Skouby, Knud Erik

    1998-01-01

    An overview of the liberalisation process and regulatory reform of telecommunications in Denmark......An overview of the liberalisation process and regulatory reform of telecommunications in Denmark...

  9. 40 CFR 73.86 - State regulatory autonomy.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State regulatory autonomy. 73.86 Section 73.86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... regulatory autonomy. Nothing in this subpart shall preclude a State or State regulatory authority from...

  10. 75 FR 12804 - Withdrawal of Regulatory Guide 8.6

    Science.gov (United States)

    2010-03-17

    ... ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0103] Withdrawal of Regulatory Guide 8.6 AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 8.6, ``Standard Test Procedure for Geiger-M...

  11. 75 FR 20868 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-21

    ... available through the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2009-0351] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.68.2...

  12. 18 CFR 284.503 - Market-power determination.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Market-power determination. 284.503 Section 284.503 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... RELATED AUTHORITIES Applications for Market-Based Rates for Storage § 284.503 Market-power determination...

  13. Subcriticality determination of nuclear reactor

    International Nuclear Information System (INIS)

    Borisenko, V.I.; Goranchuk, V.V.; Sidoruk, N.M.; Volokh, A.F.

    2014-01-01

    In this article the subcriticality determination of nuclear reactor is considered. Emphasized that, despite the requirements of regulatory documents on the subcriticality determination of WWER from the beginning of their operation, so far, this problem has not been solved. The results of subcriticality determination of Rossi-α method of the WWER-M is presented. The possibility of subcriticality determination of WWER is considered. The possibility of subcriticality determination of Rossi-α method with time resolution is of about 100 microseconds is also considered. The possible reasons for the error in subcriticality determination of the reactor are indicated

  14. Regulatory challenges of historic uranium mines in Canada

    International Nuclear Information System (INIS)

    Clement, C.H.; Stenson, R.E.

    2002-01-01

    The radium and uranium mining industry began in Canada in 1930 with the discovery of the Port Radium deposit in the Northwest Territories. During the 1950s more uranium mines opened across Canada. Most of these mines ceased operation by the end of the 1960s. Some were remediated by their owners, while others were abandoned. The Atomic Energy Control Board (AECB), predecessor to the Canadian Nuclear Safety Commission (CNSC), was created in 1946. However, it was not until the mid-1970s that the AECB took an active role in regulating health, safety and environmental aspects of uranium mining; so many of the older mines have never been licensed. With the coming into force of the Nuclear Safety and Control Act (NSCA) in May 2000, this situation has been reviewed. The NSCA requires a licence for the possession of nuclear substances (including uranium mine tailings), or the decommissioning of nuclear facilities (including uranium mines and mills). Furthermore, governments (federal and provincial) are also subject to the NSCA, a change from the previous legislation. The CNSC has an obligation to assess these sites, regardless of ownership, and to proceed with licensing or other appropriate regulatory action. The CNSC has reviewed the status of the twenty sites in Canada where uranium milling took place historically. Eight are already licensed. Licensing actions are being pursued at the other sites. A review of nearly 100 small uranium mining or exploration sites is also underway to determine the most appropriate regulatory approach. This paper focuses on regulatory issues surrounding the historic mining and milling sites, and the regulatory approach being taken, including licensing provincial and federal government bodies who own some of the sites, and ensuring the safe management of sites that were abandoned. (author)

  15. AGC-1 Experiment and Final Preliminary Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Robert L. Bratton; Tim Burchell

    2006-08-01

    This report details the experimental plan and design as of the preliminary design review for the Advanced Test Reactor Graphite Creep-1 graphite compressive creep capsule. The capsule will contain five graphite grades that will be irradiated in the Advanced Test Reactor at the Idaho National Laboratory to determine the irradiation induced creep constants. Seven other grades of graphite will be irradiated to determine irradiated physical properties. The capsule will have an irradiation temperature of 900 C and a peak irradiation dose of 5.8 x 10{sup 21} n/cm{sup 2} [E > 0.1 MeV], or 4.2 displacements per atom.

  16. Quality assurance within regulatory bodies

    International Nuclear Information System (INIS)

    1999-06-01

    The IAEA directed extensive efforts during the years 1991 to 1995 to the integral revision of all NUSS quality assurance publications, which were approved and issued as Safety Series No.50-C/SG-Q, Quality Assurance for Safety in Nuclear Power Plants and other Nuclear Installations (1996). When these quality assurance publications were developed, their prime focus was on requirements against which work performed by the licensees could be measured and assessed by the regulatory bodies. In this way, they only helped to facilitate the functions of regulators. No requirements or recommendations were provided on how the regulators should ensure the effective implementation of their own activities. The present publication is a first attempt to collect, integrate and offer available experience to directly support performance of regulatory activities. It presents a comprehensive compilation on the application of quality assurance principles and methods by regulatory bodies to their activities. The aim is consistent good performance of regulatory activities through a systematic approach

  17. Summary of the Preliminary Analysis of Savannah River Depleted Uranium Trioxide

    International Nuclear Information System (INIS)

    2010-01-01

    This report summarizes a preliminary special analysis of the Savannah River Depleted Uranium Trioxide waste stream (SVRSURANIUM03, Revision 2). The analysis is considered preliminary because a final waste profile has not been submitted for review. The special analysis is performed to determine the acceptability of the waste stream for shallow land burial at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site (NNSS). The Savannah River Depleted Uranium Trioxide waste stream requires a special analysis because the waste stream's sum of fractions exceeds one. The 99Tc activity concentration is 98 percent of the NNSS Waste Acceptance Criteria and the largest single contributor to the sum of fractions.

  18. 75 FR 7244 - Narrow Woven Ribbons with Woven Selvedge from the People's Republic of China: Preliminary...

    Science.gov (United States)

    2010-02-18

    ... the United States at less than fair value (``LTFV''), as provided in section 733 of the Tariff Act of... Determination of Sales at Less Than Fair Value: Certain Softwood Lumber Products From Canada, 67 FR 15539 (April...: Preliminary Determination of Sales at Less Than Fair Value and Postponement of Final Determination, 73 FR...

  19. 47 CFR 1.1160 - Refunds of regulatory fees.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Refunds of regulatory fees. 1.1160 Section 1... Statutory Charges and Procedures for Payment § 1.1160 Refunds of regulatory fees. (a) Regulatory fees will be refunded, upon request, only in the following instances: (1) When no regulatory fee is required or...

  20. 78 FR 69732 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2013-11-20

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of a Proposed Rule Change To Amend FINRA Rule 8312 (FINRA BrokerCheck Disclosure) To Include Information About Members and Their Associated Persons of Any Registered National Securities Exchange That Uses the CRD System for...

  1. Preliminary evaluation of the BIODOSE computer program

    International Nuclear Information System (INIS)

    Bonner, N.A.; Ng, Y.C.

    1979-09-01

    The BIODOSE computer program simulates the environmental transport of radionuclides released to surface water and predicts the dosage to humans. We have evaluated the program for its suitability to the needs of the Nuclear Regulatory Commission Waste Management Program. In particular, it is an evaluation to determine whether BIODOSE models account for the significant pathways and mechanisms resulting in radiological doses to man. In general, BIODOSE is a satisfactory code for converting radionuclide releases to the aqueous environment into doses to man

  2. Regulatory Safety Requirements for Operating Nuclear Installations

    International Nuclear Information System (INIS)

    Gubela, W.

    2017-01-01

    The National Nuclear Regulator (NNR) is established in terms of the National Nuclear Regulator Act (Act No 47 of 1999) and its mandate and authority are conferred through sections 5 and 7 of this Act, setting out the NNR's objectives and functions, which include exercising regulatory control over siting, design, construction etc of nuclear installations through the granting of nuclear authorisations. The NNR's responsibilities embrace all those actions aimed at providing the public with confidence and assurance that the risks arising from the production of nuclear energy remain within acceptable safety limits -> Therefore: Set fundamental safety standards, conducting pro-active safety assessments, determining licence conditions and obtaining assurance of compliance. The promotional aspects of nuclear activities in South Africa are legislated by the Nuclear Energy Act (Act No 46 of 1999). The NNR approach to regulations of nuclear safety and security take into consideration, amongst others, the potential hazards associated with the facility or activity, safety related programmes, the importance of the authorisation holder's safety related processes as well as the need to exercise regulatory control over the technical aspects such as of the design and operation of a nuclear facility in ensuring nuclear safety and security. South Africa does not have national nuclear industry codes and standards. The NNR is therefore non-prescriptive as it comes to the use of industry codes and standards. Regulatory framework (current) provide for the protection of persons, property, and environment against nuclear damage, through Licensing Process: Safety standards; Safety assessment; Authorisation and conditions of authorisation; Public participation process; Compliance assurance; Enforcement

  3. A cluster of coregulated genes determines TGF-beta-induced regulatory T-cell (Treg) dysfunction in NOD mice.

    Science.gov (United States)

    D'Alise, Anna Morena; Ergun, Ayla; Hill, Jonathan A; Mathis, Diane; Benoist, Christophe

    2011-05-24

    Foxp3(+) regulatory T cells (Tregs) originate in the thymus, but the Treg phenotype can also be induced in peripheral lymphoid organs or in vitro by stimulation of conventional CD4(+) T cells with IL-2 and TGF-β. There have been divergent reports on the suppressive capacity of these TGF-Treg cells. We find that TGF-Tregs derived from diabetes-prone NOD mice, although expressing normal Foxp3 levels, are uniquely defective in suppressive activity, whereas TGF-Tregs from control strains (B6g7) or ex vivo Tregs from NOD mice all function normally. Most Treg-typical transcripts were shared by NOD or B6g7 TGF-Tregs, except for a small group of differentially expressed genes, including genes relevant for suppressive activity (Lrrc32, Ctla4, and Cd73). Many of these transcripts form a coregulated cluster in a broader analysis of T-cell differentiation. The defect does not map to idd3 or idd5 regions. Whereas Treg cells from NOD mice are normal in spleen and lymph nodes, the NOD defect is observed in locations that have been tied to pathogenesis of diabetes (small intestine lamina propria and pancreatic lymph node). Thus, a genetic defect uniquely affects a specific Treg subpopulation in NOD mice, in a manner consistent with a role in determining diabetes susceptibility.

  4. Grand Gulf-prioritization of regulatory requirements

    International Nuclear Information System (INIS)

    Meisner, M.J.

    1993-01-01

    As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit

  5. Regulatory foci and the big five

    OpenAIRE

    Bak, Waclaw

    2009-01-01

    The distinction between promotion and prevention focus (Higgins, 1997) have been employed by many researchers dealing with processes of self-regulation. Little is known however about relations between regulatory orientations and more general personality traits. The present paper reports results of the study in which regulatory foci are analyzed in the context of five factor model of personality. To measure personality traits the NEO-FFI was used. Promotion and prevention regulatory foci was a...

  6. NEOWISE REACTIVATION MISSION YEAR ONE: PRELIMINARY ASTEROID DIAMETERS AND ALBEDOS

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, C. R.; Cutri, R. M. [Infrared Processing and Analysis Center, California Institute of Technology, Pasadena, CA 91125 (United States); Mainzer, A.; Masiero, J.; Bauer, J.; Kramer, E.; Sonnett, S.; Stevenson, R. [Jet Propulsion Laboratory, California Institute of Technology, Pasadena, CA 91109 (United States); Grav, T. [Planetary Science Institute, Tucson, AZ (United States); Wright, E. L., E-mail: cnugent@ipac.caltech.edu [Department of Physics and Astronomy, University of California, Los Angeles, CA 90095 (United States)

    2015-12-01

    We present preliminary diameters and albedos for 7956 asteroids detected in the first year of the NEOWISE Reactivation mission. Of those, 201 are near-Earth asteroids and 7755 are Main Belt or Mars-crossing asteroids. 17% of these objects have not been previously characterized using the Near-Earth Object Wide-field Infrared Survey Explorer, or “NEOWISE” thermal measurements. Diameters are determined to an accuracy of ∼20% or better. If good-quality H magnitudes are available, albedos can be determined to within ∼40% or better.

  7. 75 FR 51004 - Drill Pipe From the People's Republic of China: Preliminary Determination of Sales at Less Than...

    Science.gov (United States)

    2010-08-18

    ... calculation of production costs invalid under the Department's normal methodologies. See, e.g., Preliminary..., Ukraine, and Peru are countries comparable to the PRC in terms of economic development. See April 20, 2010... circumstances, on the NME producer's factors of production (``FOPs'') valued in a surrogate market-economy...

  8. Regulatory authority infrastructure for Namibia

    International Nuclear Information System (INIS)

    Shangula, K.

    2001-01-01

    The Republic of Namibia is participating in the International Atomic Energy Agency's Model Project for the Improvement of National Regulatory Authority Infrastructures in Member States. The paper illustrates our experience in solving problems and difficulties confronted in establishing an effective regulatory authority operating within the existing national infrastructure that should be supported by the Government. An effective regulatory authority is seen as part of the wider administrative scope of our Government through ministerial mandates given by the State from time to time, guaranteeing its independence when implementing legal provisions under statutes. Sections of the report illustrate our experience in the following areas: 1. National radiation protection policy 2. Structure of our national regulatory authority 3. Laws and regulations 4. Provisions for notification, authorization and registration 5. In-depth security measures for radiation sources and radioactive material 6. Systems for the inspection of radiation sources, radioactive materials, enforcement of legal provisions 7. Extent of the applications of radiation sources and radioactive materials in the country. The paper provides information regarding existing Government policy on radiation protection; structure and legal aspects of the national regulatory, including statutes and regulations; the extent of application and uses of radiation sources and security of radioactive materials; human resources: strengths and constraints; management practices and financing of regulatory authority; and plans for emergency recovery of orphan sources. National plans for management of disused sources, recovery of orphan sources, abnormal emergencies, communication of information to affected persons on exposure effects, and the safety training of persons using these applications are discussed. the paper provides a summary and some suggestions of the way forward for Namibia. (author)

  9. Regulatory focus and the family-work interface : the role of regulatory fit between cohabiting partners

    NARCIS (Netherlands)

    Demerouti, E.; Bakker, A.B.; Tetrick, L.

    2014-01-01

    The aim of the present study was to examine the impact of regulatory focus in goal pursuit and regulatory fit between marital partners on family conditions and the family–work interface. We hypothesized that when both partners are high on promotion focus (fit) they experience higher developmental

  10. 77 FR 23770 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2012-04-20

    ...: The financial markets as a whole should benefit from [limit order display] because the price discovery... revised tier sizes and corresponding liquidity minimum amounts are in the best interest of the market for...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of Amendment No. 1...

  11. 77 FR 52791 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Minimum Regulatory...

    Science.gov (United States)

    2012-08-30

    ... the Basel Committee on Banking Supervision (BCBS) in ``Basel III: A Global Regulatory Framework for... seeking comment on the two related NPRs published elsewhere in today's Federal Register. The two related... them on Regulations.gov without change, including any business or personal information that you provide...

  12. Regulatory instrument review: Management of aging of LWR [light water reactor] major safety-related components

    International Nuclear Information System (INIS)

    Werry, E.V.

    1990-10-01

    This report comprises Volume 1 of a review of US nuclear plant regulatory instruments to determine the amount and kind of information they contain on managing the aging of safety-related components in US nuclear power plants. The review was conducted for the US Nuclear Regulatory Commission (NRC) by the Pacific Northwest Laboratory (PNL) under the NRC Nuclear Plant Aging Research (NPAR) Program. Eight selected regulatory instruments, e.g., NRC Regulatory Guides and the Code of Federal Regulations, were reviewed for safety-related information on five selected components: reactor pressure vessels, steam generators, primary piping, pressurizers, and emergency diesel generators. Volume 2 will be concluded in FY 1991 and will also cover selected major safety-related components, e.g., pumps, valves and cables. The focus of the review was on 26 NPAR-defined safety-related aging issues, including examination, inspection, and maintenance and repair; excessive/harsh testing; and irradiation embrittlement. The major conclusion of the review is that safety-related regulatory instruments do provide implicit guidance for aging management, but include little explicit guidance. The major recommendation is that the instruments be revised or augmented to explicitly address the management of aging

  13. The Influence of the Self-Regulatory Focus on the Effectiveness of Stop-Smoking Campaigns for Young Smokers

    OpenAIRE

    L. ADAMS; T. FASEUR; M. GEUENS

    2010-01-01

    People’s self-regulatory focus may determine the effectiveness of stop-smoking campaigns. An experiment with 226 young smokers investigated the persuasiveness of different emotional appeals (fear-relief versus sadness-joy) for different self-regulatory foci (prevention versus promotion). A congruency effect emerges for attitude toward the advertisement and behavioral intentions: Young smokers with a promotion focus are more persuaded by sadness-joy than fear-relief campaigns, and the opposite...

  14. Regulatory Hybridization in the Transnational Sphere

    DEFF Research Database (Denmark)

    Kjær, Poul Fritz; Jurcys, Paulius; Yrakami, Ren

    Hybridization has become a defining feature of regulatory frameworks. The combined forces of globalization and privatization together with increased reliance on self-regulation have resulted in the emergence of a multitude of regulatory arrangements which combine elements from several legal orders....... This book offers a conceptual framework as well as numerous empirical explorations capable of increasing our understanding of regulatory hybridization. A number of central dichotomies are deconstructed: national vs. transnational law; international vs. transnational law; convergence vs. divergence; … read...... moresoft law vs. hard law; territorial vs. non-territorial, ‘top-down’ vs. ‘bottom-up’ globalization and national vs. global just as the implications of regulatory hybridization for the question of choice of court and conflict of laws are analyzed....

  15. Regulatory focus in groupt contexts

    NARCIS (Netherlands)

    Faddegon, Krispijn Johannes

    2009-01-01

    The thesis examines the influence of group processes on the regulatory focus of individual group members. It is demonstrated that the group situation can affect group members' regulatory focus both in a top-down fashion (via the identitiy of the group) and in a bottom-up fashion (emerging from the

  16. Purification, crystallization and preliminary crystallographic analysis of human cystathionine β-synthase

    International Nuclear Information System (INIS)

    Oyenarte, Iker; Majtan, Tomas; Ereño, June; Corral-Rodríguez, María Angeles; Kraus, Jan P.; Martínez-Cruz, Luis Alfonso

    2012-01-01

    This article describes the crystallization and preliminary crystallographic analysis of a protein construct (hCBS 516–525 ) that contains the full-length cystathionine β-synthase from Homo sapiens (hCBS) and just lacks amino-acid residues 516–525. Human cystathionine β-synthase (CBS) is a pyridoxal-5′-phosphate-dependent hemeprotein, whose catalytic activity is regulated by S-adenosylmethionine. CBS catalyzes the β-replacement reaction of homocysteine (Hcy) with serine to yield cystathionine. CBS is a key regulator of plasma levels of the thrombogenic Hcy and deficiency in CBS is the single most common cause of homocystinuria, an inherited metabolic disorder of sulfur amino acids. The properties of CBS enzymes, such as domain organization, oligomerization degree or regulatory mechanisms, are not conserved across the eukaryotes. The current body of knowledge is insufficient to understand these differences and their impact on CBS function and physiology. To overcome this deficiency, we have addressed the crystallization and preliminary crystallographic analysis of a protein construct (hCBS 516–525 ) that contains the full-length CBS from Homo sapiens (hCBS) and just lacks amino-acid residues 516–525, which are located in a disordered loop. The human enzyme yielded crystals belonging to space group I222, with unit-cell parameters a = 124.98, b = 136.33, c = 169.83 Å and diffracting X-rays to a resolution of 3.0 Å. The crystal structure appears to contain two molecules in the asymmetric unit which presumably correspond to a dimeric form of the enzyme

  17. Association of Regulatory Boards of Optometry

    Science.gov (United States)

    ... website of the Association of Regulatory Boards of Optometry (ARBO). ARBO's web site is designed to provide resources to regulatory boards of optometry throughout the world. State/Provincial/Territorial Boards of ...

  18. Role of regulatory subunits and protein kinase inhibitor (PKI) in determining nuclear localization and activity of the catalytic subunit of protein kinase A.

    Science.gov (United States)

    Wiley, J C; Wailes, L A; Idzerda, R L; McKnight, G S

    1999-03-05

    Regulation of protein kinase A by subcellular localization may be critical to target catalytic subunits to specific substrates. We employed epitope-tagged catalytic subunit to correlate subcellular localization and gene-inducing activity in the presence of regulatory subunit or protein kinase inhibitor (PKI). Transiently expressed catalytic subunit distributed throughout the cell and induced gene expression. Co-expression of regulatory subunit or PKI blocked gene induction and prevented nuclear accumulation. A mutant PKI lacking the nuclear export signal blocked gene induction but not nuclear accumulation, demonstrating that nuclear export is not essential to inhibit gene induction. When the catalytic subunit was targeted to the nucleus with a nuclear localization signal, it was not sequestered in the cytoplasm by regulatory subunit, although its activity was completely inhibited. PKI redistributed the nuclear catalytic subunit to the cytoplasm and blocked gene induction, demonstrating that the nuclear export signal of PKI can override a strong nuclear localization signal. With increasing PKI, the export process appeared to saturate, resulting in the return of catalytic subunit to the nucleus. These results demonstrate that both the regulatory subunit and PKI are able to completely inhibit the gene-inducing activity of the catalytic subunit even when the catalytic subunit is forced to concentrate in the nuclear compartment.

  19. Regulatory point of view of SAT application

    International Nuclear Information System (INIS)

    Juhasz, L.

    2002-01-01

    I present the regulatory system for monitoring operator training and check competency of operator personnel in Hungary and the effects of SAT to the regulatory framework/practice related to recruitment, training and authorisation of operating personnel. Also I introduce an application to manage the initial and refreshing training to regulatory bodies. (author)

  20. Preliminary identification of potentially disruptive scenarios at the Greater Confinement Disposal Facility, Area 5 of the Nevada Test Site

    International Nuclear Information System (INIS)

    Guzowski, R.V.; Newman, G.

    1993-12-01

    The Greater Confinement Disposal location is being evaluated to determine whether defense-generated transuranic waste buried at this location complies with the Containment Requirements established by the US Environmental Protection Agency. One step in determining compliance is to identify those combinations of events and processes (scenarios) that define possible future states of the disposal system for which performance assessments must be performed. An established scenario-development procedure was used to identify a comprehensive set of mutually exclusive scenarios. To assure completeness, 761 features, events, processes, and other listings (FEPS) were compiled from 11 references. This number was reduced to 205 primarily through the elimination of duplications. The 205 FEPs were screened based on site-specific, goal-specific, and regulatory criteria. Four events survived screening and were used in preliminary scenario development: (1) exploratory drilling penetrates a GCD borehole, (2) drilling of a withdrawal/injection well penetrates a GCD borehole, (3) subsidence occurs at the RWMS, and (4) irrigation occurs at the RWMS. A logic diagram was used to develop 16 scenarios from the four events. No screening of these scenarios was attempted at this time. Additional screening of the currently retained events and processes will be based on additional data and information from site-characterization activities. When screening of the events and processes is completed, a final set of scenarios will be developed and screened based on consequence and probability of occurrence

  1. Small Business Administration Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... small business concerns owned and controlled by women, and to women wishing to start a small business... Business Administration Semiannual Regulatory Agenda] Part XVII Small Business Administration Semiannual Regulatory Agenda [[Page 79864

  2. Assessing the effectiveness of nuclear regulatory system in India

    International Nuclear Information System (INIS)

    Gandhia, Sonal; Choi, Kwang Sik

    2012-01-01

    The Fukushima accident brought up the issue of regulatory effectiveness in the fore. One of the causes of the accident has been attributed to the problems in effectiveness of the Japanese regulatory system. Regulatory reform is underway in Japan and in other countries many efforts have also been made to improve the effectiveness and independence of the regulatory bodies. It is important that the regulatory bodies make self-assessment of their weaknesses and strengths, to achieve the ultimate regulatory goal of assuring acceptable level of nuclear safety. In this paper an assessment has been done for the effectiveness of Indian nuclear regulatory system as implemented by the Atomic Energy Regulatory board (AERB). A number of good practices of AERB have been found and some areas have been identified where improvements are necessary

  3. Regulatory Body of Egypt: Practices and Challenges

    International Nuclear Information System (INIS)

    El-Messiry, A.

    2016-01-01

    In past, Egypt issued the law No. 59 of year 1969 for regulating the use of ionizing radiations inside the country, this law assigns the responsibilities of Egypt Atomic Energy Authority EAEA to control reactors, open sources, and all nuclear and radiation facilities inside its premises, while the ministry of health was responsible for controlling x-ray machine, sealed sources and accelerators. In 1982 EAEA established within its structure a new regulatory body called national centre for Nuclear Safety and radiation Control NC-NSRC as a dependent regulatory body, science EAEA is the operator of reactors and many nuclear and radiation facilities. On 30 March 2010 Egypt issued a nuclear law No 7 of year 2010, followed by its executive regulation in October 2011, the new law replaced the old law 59 of year 1969, in addition, the prime minster issued a decree on march 5td 2012 of establishing an independent regulatory body reported directly to him, it has the name of Egypt Nuclear and Radiological Regulatory Authority ENRRA, it is responsible for regulating all nuclear and radiation facilities and activities inside the country, except X-ray machines and linear accelerators for the medical uses, that still remains under the control of ministry of health. The new nuclear law defines the responsibility of the government to establish, support and determine the authorization and the responsibilities of the independent regulatory body. ENRRA is managed by a board of directors comprises from chairman, vice chairman, head of national security, interior, exterior, customs, export & import, standards, environment, justice organizations, besides two scientific experts from ENRRA. The board of council is the supreme authority of the dominant, and the conduct of ENRRA affairs, and take decisions within the framework of the national plan of Egypt, to achieve the objectives for which the ENRRA was established. ENRRA was organized from the old NC-NSRC staff into three regulatory

  4. rSNPBase 3.0: an updated database of SNP-related regulatory elements, element-gene pairs and SNP-based gene regulatory networks.

    Science.gov (United States)

    Guo, Liyuan; Wang, Jing

    2018-01-04

    Here, we present the updated rSNPBase 3.0 database (http://rsnp3.psych.ac.cn), which provides human SNP-related regulatory elements, element-gene pairs and SNP-based regulatory networks. This database is the updated version of the SNP regulatory annotation database rSNPBase and rVarBase. In comparison to the last two versions, there are both structural and data adjustments in rSNPBase 3.0: (i) The most significant new feature is the expansion of analysis scope from SNP-related regulatory elements to include regulatory element-target gene pairs (E-G pairs), therefore it can provide SNP-based gene regulatory networks. (ii) Web function was modified according to data content and a new network search module is provided in the rSNPBase 3.0 in addition to the previous regulatory SNP (rSNP) search module. The two search modules support data query for detailed information (related-elements, element-gene pairs, and other extended annotations) on specific SNPs and SNP-related graphic networks constructed by interacting transcription factors (TFs), miRNAs and genes. (3) The type of regulatory elements was modified and enriched. To our best knowledge, the updated rSNPBase 3.0 is the first data tool supports SNP functional analysis from a regulatory network prospective, it will provide both a comprehensive understanding and concrete guidance for SNP-related regulatory studies. © The Author(s) 2017. Published by Oxford University Press on behalf of Nucleic Acids Research.

  5. Crystallization and preliminary X-ray diffraction analysis of rat autotaxin

    International Nuclear Information System (INIS)

    Day, Jacqueline E.; Hall, Troii; Pegg, Lyle E.; Benson, Timothy E.; Hausmann, Jens; Kamtekar, Satwik

    2010-01-01

    Autotaxin (ATX), a pyrophosphatase/phosphodiesterase enzyme, is a promising drug target for many indications and is only distantly related to enzymes of previously determined structure. Here, the cloning, expression, purification, crystallization and preliminary diffraction analysis of ATX are reported. Rat autotaxin has been cloned, expressed, purified to homogeneity and crystallized via hanging-drop vapour diffusion using PEG 3350 as precipitant and ammonium iodide and sodium thiocyanate as salts. The crystals diffracted to a maximum resolution of 2.05 Å and belonged to space group P1, with unit-cell parameters a = 53.8, b = 63.3, c = 70.5 Å, α = 98.8, β = 106.2, γ = 99.8°. Preliminary X-ray diffraction analysis indicated the presence of one molecule per asymmetric unit, with a solvent content of 47%

  6. Development of multipurpose regulatory PSA model

    International Nuclear Information System (INIS)

    Lee, Chang Ju; Sung, Key Yong; Kim, Hho Jung; Yang, Joon Eon; Ha, Jae Joo

    2004-01-01

    Generally, risk information for nuclear facilities comes from the results of Probabilistic safety assessment (PSA). PSA is a systematic tool to ensure the safety of nuclear facilities, since it is based on thorough and consistent application of probability models. In particular, the PSA has been widely utilized for risk-informed regulation (RIR), including various licensee-initiated risk-informed applications (RIA). In any regulatory decision, the main goal is to make a sound safety decision based on technically defensible information. Also, due to the increased public requests for giving a safety guarantee, the regulator should provide the visible means of safety. The use of PSA by the regulator can give the answer on this problem. Therefore, in order to study the applicability of risk information for regulatory safety management, it is a demanding task to prepare a well-established regulatory PSA model and tool. In 2002, KINS and KAERI together made a research cooperation to form a working group to develop the regulatory PSA model - so-called MPAS model. The MPAS stands for multipurpose probabilistic analysis of safety. For instance, a role of the MPAS model is to give some risk insights in the preparation of various regulatory programs. Another role of this model is to provide an independent risk information to the regulator during regulatory decision-making, not depending on the licensee's information

  7. Preliminary observations of gate valve flow interruption tests, Phase 2

    International Nuclear Information System (INIS)

    Steele, R. Jr.; DeWall, K.G.

    1990-01-01

    This paper presents preliminary observations from the US Nuclear Regulatory Commission/Idaho National Engineering Laboratory Flexible Wedge Gate Valve Qualification and Flow Interruption Test Program, Phase 2. The program investigated the ability of selected boiling water reactor (BWR) process line valves to perform their containment isolation function at high energy pipe break conditions and other more normal flow conditions. The fluid and valve operating responses were measured to provide information concerning valve and operator performance at various valve loadings so that the information could be used to assess typical nuclear industry motor operator sizing equations. Six valves were tested, three 6-in. isolation valves representative of those used in reactor water cleanup systems in BWRs and three 10-in. isolation valves representative of those used in BWR high pressure coolant injection (HPCI) steam lines. The concern with these normally open isolation valves is whether they will close in the event of a downstream pipe break outside of containment. The results of this testing will provide part of the technical insights for NRC efforts regarding Generic Issue 87 (GI-87), Failure of the HPCI Steam Line Without Isolation, which includes concerns about the uncertainties in gate valve motor operator sizing and torque switch settings for these BWR containment isolation valves. As of this writing, the Phase 2 test program has just been completed. Preliminary observations made in the field confirmed most of the results from the Phase 1 test program. All six valves closing in high energy water, high energy steam, and high pressure cold water require more force to close than would be calculated using the typical variables in the standard industry motor operator sizing equations

  8. Readability and Understanding of Informed Consent Among Participants With Low Incomes: A Preliminary Report.

    Science.gov (United States)

    Ittenbach, Richard F; Senft, Elizabeth C; Huang, Guixia; Corsmo, Jeremy J; Sieber, Joan E

    2015-12-01

    With passage and implementation of the Affordable Health Care Act, more vulnerable segments of the U.S. population will now have access to regular health care and increased opportunities to participate in biomedical research. Yet, access to new groups brings with it new responsibilities for investigators, most importantly, reducing burdens for participants. Data collected through this small pilot study suggest several preliminary but potentially important findings when working with adults from low-income populations: First, while all participants read some parts of the consent forms (55%), only a minority reported reading the entire form (45%); second, 73% of participants reported understanding the study very well whereas only 27% reported understanding the study "a little"; third, there was a slight reported advantage of the simplified form over the regular form; however, this difference varied by section. Relatedly, other research has shown a high incidence of persons reading none of the consent form, but signing a statement that they have read and understood the study. Why does this occur? What are we teaching people when we request that they sign a consent form they have chosen not to read? What are the ethical and regulatory implications? Embedded ethics studies such as this one, although pilot and preliminary in nature, offer a number of advantages, such as stimulating additional scientific inquiry as well as challenging established institutional practices. © The Author(s) 2015.

  9. Measuring and Modeling the U.S. Regulatory Ecosystem

    Science.gov (United States)

    Bommarito, Michael J., II; Katz, Daniel Martin

    2017-09-01

    Over the last 23 years, the U.S. Securities and Exchange Commission has required over 34,000 companies to file over 165,000 annual reports. These reports, the so-called "Form 10-Ks," contain a characterization of a company's financial performance and its risks, including the regulatory environment in which a company operates. In this paper, we analyze over 4.5 million references to U.S. Federal Acts and Agencies contained within these reports to measure the regulatory ecosystem, in which companies are organisms inhabiting a regulatory environment. While individuals across the political, economic, and academic world frequently refer to trends in this regulatory ecosystem, far less attention has been paid to supporting such claims with large-scale, longitudinal data. In this paper, in addition to positing a model of regulatory ecosystems, we document an increase in the regulatory energy per filing, i.e., a warming "temperature." We also find that the diversity of the regulatory ecosystem has been increasing over the past two decades. These findings support the claim that regulatory activity and complexity are increasing, and this framework contributes an important step towards improving academic and policy discussions around legal complexity and regulation.

  10. The future regulatory environment - a South African perspective

    International Nuclear Information System (INIS)

    Van der Woude, S.; Leaver, J.; Metcalf, P.E.

    2000-01-01

    The South African nuclear regulatory authority, the National Nuclear Regulator, regulates nuclear fuel cycle facilities as well as a large variety of mining and minerals processing activities. The future political, social, economical and technological environment, within which these facilities operate, will present numerous challenges to those who will be regulating them. In our presentation the challenges to be fulfilled in discharging the regulatory function are discussed, particularly in the context of a country with a small nuclear programme and a substantial developing component. Amongst the challenges discussed are: As part of the growing internationalization, the need to harmonize standards applied in different countries and the need to balance standards and practice applied in developed countries with resources available in developing countries; The need to consider the impact on the environment and not only on human beings; The impact of rapid advances in information technology on regulation; The maintenance and development of the appropriate expertise in the face of uncertainties regarding the future of the nuclear industry; Public involvement; The demands by society for greater standards of safety but at the same time for more effective and cost-effective regulation; The need for regulators to match customer demands on operators in terms of quality, speed, flexibility and costs; The privatization of nuclear fuel cycle facilities; The increased trend for larger facilities to outsource work to smaller companies; and, The need to balance good practice considerations with quantitatively determined risks in regulatory decision-making. (author)

  11. The future regulatory environment - a South African perspective

    Energy Technology Data Exchange (ETDEWEB)

    Van der Woude, S.; Leaver, J.; Metcalf, P.E. [National Nuclear Regulator, Centurion (South Africa)

    2000-07-01

    The South African nuclear regulatory authority, the National Nuclear Regulator, regulates nuclear fuel cycle facilities as well as a large variety of mining and minerals processing activities. The future political, social, economical and technological environment, within which these facilities operate, will present numerous challenges to those who will be regulating them. In our presentation the challenges to be fulfilled in discharging the regulatory function are discussed, particularly in the context of a country with a small nuclear programme and a substantial developing component. Amongst the challenges discussed are: As part of the growing internationalization, the need to harmonize standards applied in different countries and the need to balance standards and practice applied in developed countries with resources available in developing countries; The need to consider the impact on the environment and not only on human beings; The impact of rapid advances in information technology on regulation; The maintenance and development of the appropriate expertise in the face of uncertainties regarding the future of the nuclear industry; Public involvement; The demands by society for greater standards of safety but at the same time for more effective and cost-effective regulation; The need for regulators to match customer demands on operators in terms of quality, speed, flexibility and costs; The privatization of nuclear fuel cycle facilities; The increased trend for larger facilities to outsource work to smaller companies; and, The need to balance good practice considerations with quantitatively determined risks in regulatory decision-making. (author)

  12. Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques [Idaho National Lab. (INL), Idaho Falls, ID (United States); Forester, John [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather [Idaho National Lab. (INL), Idaho Falls, ID (United States); Persensky, Julius [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-08-01

    This report presents preliminary research results from the investigation into the development of new models and guidance for Concepts of Operations in advanced small modular reactor (AdvSMR) designs. AdvSMRs are nuclear power plants (NPPs), but unlike conventional large NPPs that are constructed on site, AdvSMRs systems and components will be fabricated in a factory and then assembled on site. AdvSMRs will also use advanced digital instrumentation and control systems, and make greater use of automation. Some AdvSMR designs also propose to be operated in a multi-unit configuration with a single central control room as a way to be more cost-competitive with existing NPPs. These differences from conventional NPPs not only pose technical and operational challenges, but they will undoubtedly also have regulatory compliance implications, especially with respect to staffing requirements and safety standards.

  13. Comparison of regulatory framework among bench marking countries for improving regulatory effectiveness in Malaysia

    International Nuclear Information System (INIS)

    Khairuddin, Nik Mohd Faiz Bin; Choi, Kwang Sik

    2010-01-01

    Nowadays some of developing countries in Asian region are announcing their planning to embark the nuclear power program. This progression are rising due to four factor: increasing political instabilities in fossil-fuel exporting countries; declining domestic natural energy resources; growing concerns about greenhouse gas emissions; and increasing demand for electricity. This paper gives a study on the comparison between Canada, Republic of South Korea and Malaysia regarding to their regulatory framework as well as the licensing procedures in controlling the nuclear power plants establishment. Canada and Korea were selected to study because of both of the countries have different system in controlling the nuclear power plants in terms of its regulatory framework as well as the licensing process. The idea is to compare these countries along with the guidelines by the IAEA and to find out what Malaysia could be learn to start the nuclear power program and find out the best practice in nuclear licensing. Factors taken into consideration are the regulatory framework, especially the nature of the licensing authority, the licensing process and enforcement actions. Together, these give a way to evaluate the effectiveness of the regulatory body due to the licensing authorization of nuclear power plant

  14. Comparison of regulatory framework among bench marking countries for improving regulatory effectiveness in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Khairuddin, Nik Mohd Faiz Bin [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    Nowadays some of developing countries in Asian region are announcing their planning to embark the nuclear power program. This progression are rising due to four factor: increasing political instabilities in fossil-fuel exporting countries; declining domestic natural energy resources; growing concerns about greenhouse gas emissions; and increasing demand for electricity. This paper gives a study on the comparison between Canada, Republic of South Korea and Malaysia regarding to their regulatory framework as well as the licensing procedures in controlling the nuclear power plants establishment. Canada and Korea were selected to study because of both of the countries have different system in controlling the nuclear power plants in terms of its regulatory framework as well as the licensing process. The idea is to compare these countries along with the guidelines by the IAEA and to find out what Malaysia could be learn to start the nuclear power program and find out the best practice in nuclear licensing. Factors taken into consideration are the regulatory framework, especially the nature of the licensing authority, the licensing process and enforcement actions. Together, these give a way to evaluate the effectiveness of the regulatory body due to the licensing authorization of nuclear power plant

  15. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  16. Annual Report 2013. Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2010-01-01

    The present Annual Report of Activities of the Nuclear Regulatory Authority (ARN), prepared regularly from the creation as independent institution, describes across seven parts and eight annexes the activities developed by the organism during 2013. The main topic are: the organization and the activity of the ARN; the regulatory standards; the licensing and inspection of nuclear power plants and critical facilities; the emergency systems; the environmental monitoring; the occupational surveillance; the training and the public information; improved organizational and budgetary developments. Also, this publication has annexes with the following content: regulatory documents; inspections to medical; presentations of publications from ARN staff; measurement and evaluation of the drinking water of Ezeiza; international expert report on the implementation of international standards on radiation protection in the Ezeiza Atomic Center; Code of Ethics of the Nuclear Regulatory Authority.

  17. Structure of an RNA dimer of a regulatory element from human thymidylate synthase mRNA

    OpenAIRE

    Dibrov, Sergey; McLean, Jaime; Hermann, Thomas

    2011-01-01

    An oligonucleotide representing a regulatory element of human thymidylate synthase mRNA has been crystallized as a dimer. The structure of the asymmetric dimer has been determined at 1.97 Å resolution.

  18. Management systems for regulatory authorities

    International Nuclear Information System (INIS)

    Mpandanyama, Rujeko Lynette

    2015-02-01

    For a regulatory body to fulfil its statutory obligations, there is need to develop and implement a regulatory management system that has the necessary arrangements for achieving and maintaining high quality performance in regulating the safety of nuclear and radiation facilities under its authority. Hence, the regulatory management system needs to fully integrate the human resources, processes and physical resources of the organization. This study sought to provide an understanding of the concept, principles, policies and fundamentals of management systems as they relate to regulatory systems in the field of radiation protection and to make appropriate recommendations to ensure that an effective management system exists for the control of ionizing radiation and radiation sources and addresses all relevant stakeholders in Zimbabwe. A comparative analysis was done on the current management status and the ideal management system, which led to the identification of the gaps existing. The main key that was found to be of significance was lack of linkages between processes and management tools within the institution. (au)

  19. 28 CFR 2.48 - Revocation: Preliminary interview.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Revocation: Preliminary interview. 2.48....48 Revocation: Preliminary interview. (a) Interviewing officer. A parolee who is retaken on a warrant issued by a Commissioner shall be given a preliminary interview by an official designated by the Regional...

  20. Trust in regulatory relations: how new insights from trust research improve regulation theory

    NARCIS (Netherlands)

    Six, F.E.

    2013-01-01

    Regulatory oversight is a key feature of public governance. This study argues - based on recent trust research - that the way in which the relation between trust and control is conceptualized in the dominant responsive regulation theory (RRT) may be improved using self determination theory (SDT).