WorldWideScience

Sample records for preliminary project proposal

  1. Preliminary project proposal : Missouri chutes, NE & IA

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This proposal is for the Missouri Chutes National Wildlife Refuge that would be in Nebraska and Iowa on the Missouri River. This preliminary project proposal focuses...

  2. Projected effects of proposed chloride-control projects on shallow ground water; preliminary results for the Wichita River basin, Texas

    Science.gov (United States)

    Garza, Sergio

    1983-01-01

    The U.S. Army Corps of Engineers' plan to control the natural chloride pollution in the Wichita River basin includes the construction of Truscott Brine Lake on a tributary of the North Wichita River. In connection with the proposed brine lake, the U.S. Geological Survey was requested to: (1) Define the existing ground-water conditions in the shallow fresh-water system of the project area; and (2) project the post-construction effects of the proposed lake on the fresh-water aquifer, especially in relation to hydraulic-head changes but also with respect to possible changes in the chemical quality of the ground water.

  3. Preliminary study of waterfowl habitat development potentials as related to inundated waterfowl habitat by the proposed Rampart Canyon Dam Project, Alaska

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report is a preliminary study of waterfowl habitat development potentials as related to inundated waterfowl habitat by the proposed Rampart Canyon dam project...

  4. Preliminary Project Investigation Proposed Expansion of St. Vincent National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The U. S. Fish and Wildlife Service (Service) proposes to protect and manage additional habitat at the St. Vincent National Wildlife Refuge (NWR) in the northeast...

  5. Preliminary Project Proposal for the Expansion of Hillside National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fish and Wildlife Service (Service) is proposing an approximate 700-acre addition to the existing acquisition boundary at Hillside National Wildlife Refuge...

  6. Preliminary project proposal : White Ranch Units, Alamosa/Monte Vista National Wildlife Refuge, Colorado

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Proposal for the U.S. Fish and Wildlife Service and the Colorado Division of Wildlife to purchase the White Ranch property in Saguache County as partial fulfillment...

  7. PRELIMINARY METHODOLOGICAL PROPOSAL FOR ESTIMATING ENVIRONMENTAL FLOWS IN PROJECTS APPROVED BY THE MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (MADS, COLOMBIA

    Directory of Open Access Journals (Sweden)

    Gabriel A. Pinilla Agudelo

    2013-09-01

    Full Text Available ABSTRACT A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogotá (UNC. The proposed method begins with an evaluation of hydrological criteria,continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macroinvertebrates, riparian vegetation, and fish. The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS. RESUMEN Se presenta una propuesta metodológica para estimar los caudales ambientales en grandes proyectos licenciados por la Agencia Nacional de Licencias Ambientales (ANLA de Colombia, resultado de un convenio interadministrativo suscrito entre el ahora Ministerio de Ambiente y Desarrollo Sostenible (MADS de Colombia y la Universidad Nacional de Colombia, Bogotá (UNC. El método propuesto parte de garantizar criterios hidrológicos, continúa con una validación hidráulica y de calidad del agua, sigue con la determinación de la integridad del hábitat, en un proceso iterativo que requiere evaluación para las condiciones antes y después de la construcción del proyecto y que permite establecer un caudal que, además de conservar las funciones ecológicas del río, garantiza los usos del recurso aguas abajo. Espec

  8. An Economic Impact Analysis of the Proposed Yakima/Klickitat Fishery Enhancement Project; Preliminary Design Report, Appendix D.

    Energy Technology Data Exchange (ETDEWEB)

    Mack, Richard S.; Cocheba, Donald J.; Green, Daniel; Hedrick, David W.

    1989-12-27

    The objective of this study is to estimate the economic impact of the proposed Yakima/Klickitat Production Project on the local economies of the Yakima and Klickitat subbasins. The project, when operating at planned maximum production, will augment the total number of salmon and steelhead returning to the subbasins by 77,600 and will increase the sustainable terminal harvest by 55,160. These estimates do not include fish harvested in the ocean or in the mainstem Columbia. In addition to evaluating the impacts of the construction, operations and maintenance, experimentation and monitoring, and harvest activities described in the Draft Environmental Assessment (Bonneville Power Administration, 1989), our analysis also evaluates some passageway improvements and Phase II screening of irrigation structures. Both of these augmentations are required In order for the project to reach maximum planned harvest levels. The study area includes the Yakima Subbasin economy (Yakima and Kittitas counties), the mid-Columbia Basin/Klickitat Subbasin economies (Klickitat, Hood River, and Wasco counties), and the Tri-Cities economy (Benton and Franklin counties). The study period extends from 1990 through 2015: from preconstruction planning activities through reaching maximum production.

  9. Projected effects of proposed salinity-control projects on shallow ground water; preliminary results for the upper Brazos River basin, Texas

    Science.gov (United States)

    Garza, Sergio

    1982-01-01

    As part of the plan to control the natural salt pollution in the upper Brazos River basin of Texas, the U.S. Army Corps of Engineers recommended construction of three impoundment and retention reservoirs. In connection with the proposed reservoirs, the U.S. Geological Survey was requested to define the existing ground-water conditions in the shallow ground-water system of the area and to project the post-construction effects of the reservoirs on the shallow aquifer, especially in relation to aquifer-head changes but also with respect to possible changes in the chemical quality of the ground water.

  10. Preliminary technical data report: WyCoalGas project water system. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The WyCoalGas, Inc. Proposed coal gasification plant site is approximately 16 miles north of Douglas, Wyoming, located generally in Sections 27 and 34, T35N, R70W of the sixth prinicpal meridian. The plant site is located in typical high plateau plains of central Wyoming. Climate in the area is typical of semi-arid central Wyoming and is subject to wide variations in temperature. Precipitation in the area averages about 14 inches per year, of which about 10 inches fall during the April-September irrigation season. Projected water requirements at the plant site are 6020 acre-feet per year. Since the proposed plant site is not near any major streams or rivers, water must be transported to it. Water will be supplied from four sources - two surface water and two groundwater. The two surface water sources are LaPrele Reservoir and flood flows from the North Platte River with a 1974 appropriations date. LaPrele Reservoir is located approximately 14 miles west of Douglas, Wyoming, and is shown on Figure A-1. Water will be released from LaPrele Reservoir and flow down LaPrele Creek to the North Platte River. Water from the North Platte River will be diverted at a point in Section 7 of T33N, R71W. The LaPrele water and excess water from the North Platte will be pumped from the river and stored in Panhandle Reservoir No. 1, which is also referred to as Combs Reservoir. A pipeline will convey water from Panhandle Reservoir No. 1 to the coal gasification plant site. The two groundwater sources are located north of Douglas and west of Douglas.

  11. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  12. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  13. 77 FR 41782 - City of Quincy; FFP Project 110, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2012-07-16

    ... Energy Regulatory Commission City of Quincy; FFP Project 110, LLC; Notice of Competing Preliminary Permit... May 1, 2012, City of Quincy and FFP Project 110, LLC filed preliminary permit applications pursuant to... 62301; (217) 228-4500. FFP Project 110, LLC's proposed project would consist of: (1) Fourteen new...

  14. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  15. OptoTracker project proposal

    CERN Document Server

    Celentano, A

    2016-01-01

    The project OptoTracker aims to investigate a new approach to track charged particles in a scintillating material, by using the optical signal. Our idea is to reconstruct the trajectory of a charged particle by collecting the scintillation light emitted along the path with pixelized photo-detectors. This would permit to obtain an image of the track, similarly to what is done in a photographic camera. Full 3D reconstruction is performed by using both the charge distribution and the hit time information folded in a sophisticated reconstruction algorithm. This solution, compared to "traditional" tracking methods, exploits the fastest information carrier within a material: the light. Therefore, an optical tracking detector would be intrinsically capable of sustaining a very high interaction rate. Moreover, the intrinsic resolution would not be limited by carriers diffusion, as happens in charge-transport based detectors. This new technology could have a very large impact both on beam experiments, thanks to the po...

  16. Preliminary Project Proposal: Proposed Expansion of Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Report contains information and location for the exapansion of Dahomey National Wildlife Refuge to the west of its existing holdings by an additional 12,000 acres...

  17. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  18. Proposed solar two project Barstow, California

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

  19. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Conway Ranch Hydropower Project; Notice of Preliminary Permit Application... the Federal Power Act (FPA), proposing to study the feasibility of the Conway Ranch Hydropower Project...

  20. A proposed model for construction project management ...

    African Journals Online (AJOL)

    The lack of a proper communication skills model for project management may ... done to identify the most important project management communication skills and applications of communication that effective project managers should possess.

  1. Preliminary results on the cryogenic target for FIREX project

    Science.gov (United States)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-06-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (˜ 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H{2} liquefaction using a dummy target instead of the foam target.

  2. Factors for implementation of development projects with an emphasis on preliminary estimates project (Case Study flagship project of Ilam

    Directory of Open Access Journals (Sweden)

    Abdollahian Vahed

    2016-12-01

    Full Text Available Without a doubt optimum performance is possible in the context of a planned development project organized failure to comply with a standard patterndoes not guarantee when a project based on financial forecasts and with the required quality. in this study, based on the standards of project management enumerating the factors for implementation of a project the study is the flagship project of Ilam and finally the implementation of the project as stated in the standard are investigated. in this research project emphasizing the preliminary estimates (estimates and time and workload has been considered and compared to the existing. according to the research findings in 83 percent of projects, project was not according to preliminary financial estimates. 100% of projects have been wrong to predict the time and projects have progressed according to preliminary forecast and in 66 percent of projects supporting private sector investment and hinder the progress of the project is appropriate and the project framework was unchanged.

  3. Preliminary aspects of a qualitative research projection

    Directory of Open Access Journals (Sweden)

    Simona Haidau

    2012-12-01

    Full Text Available In this paper are presented preliminary aspects on the design of of qualitative research achieved by nongovernmental organizations in the North-East of Romȃnia. The research aims to identify attitudes, opinions and behaviors to nongovernmental organizations to implement public relations programs and campaigns.

  4. Recent Development and Preliminary Results of Chinese Meridian Project

    Institute of Scientific and Technical Information of China (English)

    WANG Chi; REN Liwen

    2013-01-01

    The Meridian Project is a ground-based network program to monitor solar-terrestrial space environment,which consists of a chain of 15 ground-based observatories located roughly along 120°E longitude and 30°N latitude.The Meridian project started in 2008,and its construction was completed by 2011.The integration and test phase of the Meridian Project conducted in 2011 demonstrated its observation capabilities as expected.The project will be in full operation in 2012.This report gives an overview of the recent development and preliminary results of the Meridian Project since 2010.

  5. Project proposal

    DEFF Research Database (Denmark)

    Katajainen, Jyrki

    2005-01-01

    The Standard Template Library (STL) is a library of generic algorithms and data structures that has been incorporated in the C++ standard and ships with all modern C++ compilers. In the CPH STL project the goal is to implement an enhanced edition of the STL. The priority-queue class of the STL...... graph-theoretic or geometric problems. In this project, the goal is to implement a CPH STL extension of the priority-queue class which provides, in addition to the normal priority-queue functionality, the operations delete(), increase(), and meld(). To make the first two of these operations possible...

  6. Project proposal:

    DEFF Research Database (Denmark)

    Katajainen, Jyrki

    2007-01-01

    The Standard Template Library (STL) is a collection of generic algorithms and data structures that is part of the standard run-time environment of the C++ programming language. The STL provides four kinds of associative element containers: set, multiset, map, and multimap. In this project the goal...

  7. Project proposal:

    DEFF Research Database (Denmark)

    Katajainen, Jyrki

    2007-01-01

    The Standard Template Library (STL) is a collection of generic algorithms and data structures that is part of the standard run-time environment of the C++ programming language. The STL provides four kinds of associative element containers: set, multiset, map, and multimap. In this project the goal...

  8. Preliminary Design Report for the Yakima/Klickitat Production Project.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration

    1990-04-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Task 1. Agreement on a refined statement of project goals. Task 2. Completion of a technical analysis of water supplies. Task 3. Completion of an experimental design plan. Task 4. Development of a harvest management plan. Task 5. Assessment of potential genetic risks. Task 6. Project coordination with all other affected parties. Task 7. Submission of a preliminary design report to the Council. Task 8. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  9. ERC Advanced Grant 2014 Project Proposal

    OpenAIRE

    Dresp-Langley, Birgitta

    2016-01-01

    Part B2: The scientific proposal (max. 15 pages) Section a. State-of-the-art and objectives: Studies based on qualitative and quantitative analyses of communication in medium size and large enterprises (Huang, 2004) have led to consider the advantages of socially responsible, cooperative, symmetrical, in short, ethical, communication for public relations, marketing and the economic development of smaller and larger organizations. Apart from being politically correct, ethical communication may...

  10. Future perspectives - proposal for Oxford Physiome Project.

    Science.gov (United States)

    Oku, Yoshitaka

    2010-01-01

    The Physiome Project is an effort to understand living creatures using "analysis by synthesis" strategy, i.e., by reproducing their behaviors. In order to achieve its goal, sharing developed models between different computer languages and application programs to incorporate into integrated models is critical. To date, several XML-based markup languages has been developed for this purpose. However, source codes written with XML-based languages are very difficult to read and edit using text editors. An alternative way is to use an object-oriented meta-language, which can be translated to different computer languages and transplanted to different application programs. Object-oriented languages are suitable for describing structural organization by hierarchical classes and taking advantage of statistical properties to reduce the number of parameter while keeping the complexity of behaviors. Using object-oriented languages to describe each element and posting it to a public domain should be the next step to build up integrated models of the respiratory control system.

  11. 77 FR 23242 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-04-18

    ... the Banks Lake Pumped Storage Project (Banks Lake Project or project) to be located on Banks Lake and... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... December 1, 2011, the Grand Coulee Project Hydroelectric Authority filed an application for a preliminary...

  12. Proposal of New PRORISK Model for GSD Projects

    Directory of Open Access Journals (Sweden)

    M. Rizwan Jameel Qureshi

    2015-05-01

    Full Text Available The level of complexity and risks associated with software are increasing exponentially because of competing environment especially in geographically distributed projects. Global software development (GSD face challenges like distance, communication and coordination challenges. The coordination and communication challenges are the main causes of failure in GSD. Project Oriented Risk Management (PRORISK is one of the models to address the importance of risk management and project management processes in standard software projects. However, existing model is not proposed to handle GSD associated risks. This warrants the proposal of new PRORISK model to manage the risks of GSD. Survey is used as a research design to validate the proposed solution. We anticipate that the proposed solution will help the software companies to cater the risks associated with GSD.

  13. [FY 1992 Budget Proposals, Requests, Projections & Summaries : Rocky Mountain Arsenal

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains information related to Rocky Mountain Arsenal's budget for the 1992 fiscal year. Detailed budget proposals, projections, and summaries are...

  14. Classroom Project: A Proposal Towards Teaching and Professional Development Innovation

    OpenAIRE

    Landín Miranda, María del Rosario

    2015-01-01

    An institutional policy that has generated collective work in the field of teacher's practice innovation and the training processes at the Universidad Veracruzana, Mexico, is the one called Aula Project (where Aula means Classroom). This project is a proposal based on three main axis: complex thinking; research and ICT. Inthe current document, I present an synthesis meta-reflexive originated from my experience in the implementation of the aforementioned project. Una de las políticas instit...

  15. Proposal of the Implementation of an International Pharmacy Graduate Preliminary Examination

    Directory of Open Access Journals (Sweden)

    Kyenghee Kwon

    2008-12-01

    Full Text Available At present, graduates of international pharmacy schools can apply to take the Korean Pharmacist Licensing Examination after passing a review by the Accreditation Board of the Pharmacy Schools and Licenses. However, since the educational content of different schools and the roles of pharmacists differ from country to country, a preliminary examination might be necessary before the Pharmacist Licensing Examination. To prepare to implement a preliminary examination for foreign pharmacy graduates in Korea, we summarized the preliminary examinations used in four other countries and presented a proposal for a preliminary examination. Data were collected via the internet and through telephone interviews with appropriate persons. The proposal was revised after a public forum. There are preliminary examinations in the USA, Canada, Australia, and the United Kingdom, and these involve written, oral, practice, and English proficiency tests. We proposed that the Korean preliminary examination consist of a written test on basic pharmacy, a test in the Korean language, and an interview. The preliminary examination should include suitable items that effectively evaluate international graduates. Graduates of international pharmacy schools who have an ability equivalent to graduates of Korean pharmacy schools should be eligible to write the Korean Licensing Examination.

  16. Science Base and Tools for Evaluating Stream Restoration Project Proposals.

    Science.gov (United States)

    Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.

    2008-12-01

    Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed

  17. 77 FR 41781 - City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2012-07-16

    ... Energy Regulatory Commission City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit... May 1, 2012, City of Quincy and FFP Project 109, LLC filed preliminary permit applications pursuant to...: Mr. Charles Bevelheimer, 730 Maine Street, Quincy, IL 62301; (217) 228-4500. FFP Project 109,...

  18. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  19. Quality framework proposal for Component Material Evaluation (CME) projects.

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, Naomi G.; Arfman, John F.; Limary, Siviengxay

    2008-09-01

    This report proposes the first stage of a Quality Framework approach that can be used to evaluate and document Component Material Evaluation (CME) projects. The first stage of the Quality Framework defines two tools that will be used to evaluate a CME project. The first tool is used to decompose a CME project into its essential elements. These elements can then be evaluated for inherent quality by looking at the subelements that impact their level of quality maturity or rigor. Quality Readiness Levels (QRLs) are used to valuate project elements for inherent quality. The Framework provides guidance for the Principal Investigator (PI) and stakeholders for CME project prerequisites that help to ensure the proper level of confidence in the deliverable given its intended use. The Framework also Provides a roadmap that defined when and how the Framework tools should be applied. Use of these tools allow the Principal Investigator (PI) and stakeholders to understand what elements the project will use to execute the project, the inherent quality of the elements, which of those are critical to the project and why, and the risks associated to the project's elements.

  20. MeerKAT Key Project Science, Specifications, and Proposals

    CERN Document Server

    Booth, R S; Jonas, J L; Fanaroff, B

    2009-01-01

    We present the specifications of the MeerKAT Karoo Array Telescope, the South African Square Kilometre Array Precursor. Some of the key science for MeerKAT is described in this document. We invite the community to submit proposals for Large Key Projects.

  1. 77 FR 70878 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-11-27

    ...., Washington, DC 20224. FOR FURTHER INFORMATION CONTACT: Requests for additional information or copies of the..., maintenance, and purchase of services to provide information. Approved: November 19, 2012. Yvette Lawrence... Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal...

  2. 75 FR 5857 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-02-04

    ..., DC 20224. FOR FURTHER INFORMATION CONTACT: Requests for additional information or copies of the..., maintenance, and purchase of services to provide information. Approved: January 15, 2010. R. Joseph Durbala... Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal...

  3. 75 FR 53019 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-30

    ... section 367(a) of the Internal Revenue Code (Code) concerning gain recognition agreements filed by United... Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of...

  4. Proposed REDD+ project for the Sundarbans: Legal and institutional issues

    Directory of Open Access Journals (Sweden)

    Saiful Karim

    2013-07-01

    Full Text Available Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM Sundarbans Project’ (CRISP to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

  5. [Kidney issues web portal--a project proposal].

    Science.gov (United States)

    Susnjara, Ivana Marasović

    2011-10-01

    Chronic kidney disease is a serious medical condition associated with premature mortality, decreased quality of life and increased health care needs. The increasing number of patients, an increasing number of kidney decease replacement therapy and increased total cost of treating end-stage disease are the characteristics ofthis important public health problem. In order to solve this problem the public health approach could be to promote health as a process of training individuals and companies to increase control over determinants of health and so improve their own health. In this case public health service proposed project is "Kidney issues web portal," which would consist of two parts, a public and official. The public portion would allow the education and health promotion by informing the entire population, and an official one would serviced the health professionals with the information needed. The project would be implemented in a series of planned activities throughout seven months. This project would include physicians who participate in the treatment of persons suffering from kidney disease, public health professionals, representatives of health institutions, industry, local authorities and associations of patients as co-operators. The project and the financing of the project would be implemented in three phases (teams formation, project design and implementation phase), and funding would be possible from several sources. The different type of evaluation would be carried out in two phases, process evaluation and finished project evaluation.

  6. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  7. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mill Town Power Project; Notice of Preliminary Permit Application Accepted..., 2011, Mill Town Power Project filed an application for a preliminary permit, pursuant to section...

  8. PROJECT ORIENTATION: A PROPOSAL TO DEVELOP A SERVICEORIENTED ARCHITECTURE

    Directory of Open Access Journals (Sweden)

    Daniel Valente Serman

    2010-12-01

    Full Text Available A service-oriented architecture (SOA is occasionally seen as a complex and undefeatable challenge (Serman, 2007. This feeling is motivated by the lack of attention from practitioners and from the academy on the means for its construction. The work aims to bring the portfolio management of IT projects as an option to guide the SOA development. A review of the literature on SOA was carried out, including case studies on the SOA adoption. A case study was also done, which analyzed some projects of a particular organization, focusing on the evolution of its services architecture. The results show a gradual development of SOA in the case studied based on projects execution and sequencing. It concludes with a proposal of a process for building SOA as well as suggestions and limitations for future research.

  9. Future Mission Proposal Opportunities: Discovery, New Frontiers, and Project Prometheus

    Science.gov (United States)

    Niebur, S. M.; Morgan, T. H.; Niebur, C. S.

    2003-01-01

    The NASA Office of Space Science is expanding opportunities to propose missions to comets, asteroids, and other solar system targets. The Discovery Program continues to be popular, with two sample return missions, Stardust and Genesis, currently in operation. The New Frontiers Program, a new proposal opportunity modeled on the successful Discovery Program, begins this year with the release of its first Announcement of Opportunity. Project Prometheus, a program to develop nuclear electric power and propulsion technology intended to enable a new class of high-power, high-capability investigations, is a third opportunity to propose solar system exploration. All three classes of mission include a commitment to provide data to the Planetary Data System, any samples to the NASA Curatorial Facility at Johnson Space Center, and programs for education and public outreach.

  10. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  11. Physical activity in solid organ transplant recipients: organizational aspects and preliminary results of the Italian project.

    Science.gov (United States)

    Roi, G S; Stefoni, S; Mosconi, G; Brugin, E; Burra, P; Ermolao, A; Granito, M; Macini, P; Mastrosimone, S; Nacchia, F; Pegoraro, C; Rigotti, P; Sella, G; Sgarzi, S; Tamè, M R; Totti, V; Trerotola, M; Tripi, F; Nanni Costa, A

    2014-09-01

    Most of the difficulties when trying to realize the proposal to prescribe physical activity for transplantation patients come from patient attitudes and cultural beliefs that ignore the benefits of exercise, but there also are organizational aspects arising from the difficulties that these patients face in accessing supervised exercise facilities. To address these difficulties, the Italian study project "Transplant … and Now Sport" was developed based on a model of cooperation among transplantation specialists, sports physicians, and exercise specialists organized as a team combining their specific skills to effectively actuate the physical exercise programs. This preliminary report is based on 26 patients (16 male, 10 female; 47.8±10.0 years old; 21 kidney and 5 liver transplantations; time from transplantation 2.3±1.4 years) who performed prescribed and supervised exercises consisting of 3 sessions per week of aerobic and strengthening exercises for 1 year. Preliminary results show a significant decrease in body mass index (t=1.966; PSocial Functioning, and Role Emotional scale scores showed a significant improvement (P<.05). Preliminary results of the study protocol "Transplant…and Now Sport" show the positive effects of the model based on cooperation among transplantation centers, sports medicine centers, and gyms in the administration of a supervised exercise prescription. These data should be considered a contribution to developing and promoting further detailed exercise protocols and to fostering improved posttransplantation health and survival, helping to ensure that physical activity becomes a safe routine medical treatment plan of patient management.

  12. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  13. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6: simulation design and preliminary results

    Directory of Open Access Journals (Sweden)

    B. Kravitz

    2015-10-01

    Full Text Available We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP. This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6, builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1 GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  14. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6): simulation design and preliminary results

    Science.gov (United States)

    Kravitz, B.; Robock, A.; Tilmes, S.; Boucher, O.; English, J. M.; Irvine, P. J.; Jones, A.; Lawrence, M. G.; MacCracken, M.; Muri, H.; Moore, J. C.; Niemeier, U.; Phipps, S. J.; Sillmann, J.; Storelvmo, T.; Wang, H.; Watanabe, S.

    2015-10-01

    We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP). This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6), builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1) GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  15. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    Energy Technology Data Exchange (ETDEWEB)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations. (DLC)

  16. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  17. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  18. Preliminary Report on Seaside Sparrow Population Genetics Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a preliminary report on a genetic variation study that was conducted at St. Vincent National Wildlife Refuge. Blood samples were taken from 57 Seaside...

  19. Preliminary Characterization Results from the DebriSat Project

    Science.gov (United States)

    Rivero, M.; Shiotani, B.; Kleespies, J.; Toledo-Burdett, R.; Moraguez, M.; Carrasquila, M.; Fitz-Coy, N.; Liou, J.-C.; Sorge, M.; Huynh, T.

    2016-01-01

    The DebriSat project is a continuing effort sponsored by NASA and DoD to update existing break-up models using data obtained from two separate hypervelocity impact tests used to simulate on-orbit collisions. To protect the fragments resulting from the impact tests, "soft-catch" arenas made of polyurethane foam panels were utilized. After each impact test, the test chamber was cleaned and debris resulting from the catastrophic demise of the test article were collected and shipped to the University of Florida for post-impact processing. The post-impact processing activities include collecting, characterizing, and cataloging of the fragments. Since the impact tests, a team of students has been working to characterize the fragments in terms of their mass, size, shape, color and material content. The focus of the 20 months since the impact tests has been on the collection of 2 millimeters- and larger fragments resulting from impact test on the 56 kilogram-representative LEO (Low Earth Orbit) satellite referred to as DebriSat. To date we have recovered in excess of 115,000 fragments, 30,000 more than the prediction of 85,000 fragments from the existing model. We continue to collect fragments but have transitioned to the characterization phase of the post-impact activities. Since the start of the characterization phase, the focus has been to utilize automation to (i) expedite fragment characterization process and (ii) minimize human-in-the- loop. We have developed and implemented such automated processes; e.g., we have automated the data entry process to reduce operator errors during transcription of the measurement data. However, at all steps of the process, there is human oversight to ensure the integrity of the data. Additionally, we have developed and implemented repeatability and reproducibility tests to ensure that the instrumentation used in the characterization process is accurate and properly calibrated. In this paper, the implemented processes are described and

  20. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application... Dam Hydropower Project to be located on the East Fork of the Little Bear River near the town of...

  1. Proposed scientific activities for the Salton Sea Scientific Drilling Project

    Energy Technology Data Exchange (ETDEWEB)

    1984-05-01

    The Salton Sea Scientific Drilling Project (SSSDP) has been organized for the purpose of investigating a hydrothermal system at depths and temperatures greater than has been done before. Plans are to deepen an existing well or to drill a new well for research purposes for which temperatures of 300/sup 0/C will be reached at a depth of less than 3.7 km and then deepen that well a further 1.8 km. This report recounts the Congressional history of the appropriation to drill the hole and other history through March 1984, gives a review of the literature on the Salton Sea Geothermal Field and its relationship to other geothermal systems of the Salton Trough, and describes a comprehensive series of investigations that have been proposed either in the well or in conjunction with the SSSDP. Investigations in geophysics, geochemistry and petrology, tectonics and rock mechanics, and geohydrology are given. A tabulation is given of current commercial and state-of-the-art downhole tools and their pressure, temperature, and minimum hole size limitations.

  2. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  3. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  4. Preliminary identification of problem soils for infrastructure projects

    CSIR Research Space (South Africa)

    Paige-Green, P

    2008-11-01

    Full Text Available soils are those within the top 1.0m or 1.5m of the soil profile, a mechanism for evaluating these materials without preliminary filed work and testing would be invaluable. Since 1971, the Department of Agriculture has systematically mapped the soils...

  5. Preliminary assessment of potential CDM early start projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

    2000-11-01

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest

  6. 77 FR 20382 - FFP Project 108, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-04-04

    ... Energy Regulatory Commission FFP Project 108, LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 108, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the... mode as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, FFP Project 108, LLC,...

  7. Preliminary report on the Northern California Power Agency's Notice of Intention to seek certification for NCPA Geothermal Project No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This preliminary report on the Northern California Power Agency (NCPA) geothermal power plant proposal has been prepared pursuant to California Public Resources Code Sections 25510, 25512, and 25540. It presents the preliminary Findings of fact and Conclusions adopted by the Commission Committee assigned to conduct proceedings on the Notice. In addition, the report contains a description of the proposed project, a summary of the proceedings to date, and local, state, and Federal government agency comments on the proposal. Finally, the report presents the Committee's view of those issues that require further consideration in future proceedings on the Notice. Pursuant to Public Resources Code Sections 25512 and 25540, the report presents preliminary Findings and Conclusions on: (1) conformity to the forecast of statewide and service area electric power demands; (2) the degree to which the proposed site and facility conform with applicable local, regional, state and Federal standards, ordinances, and laws; and (3) the safety and reliability of the facility.

  8. Proposing methodology pattern for measuring public value of IT projects

    Directory of Open Access Journals (Sweden)

    Dinko Kancijan

    2011-06-01

    Full Text Available The assessment of the acceptability and the value of IT projects in the public sector, especially when the projects feature the qualitative value along with the monetary one, is a complex problem. There are certain methodologies in the world though that help various organizations in decision-making process when projects are being chosen. The paper surveys the three IT projects public value assessing methodologies: the American Value Measuring Methodology, the French MAREVA, and the German WiBe. A comparison of the approaches to solving the problem of assessing public value of IT projects was thus made. The Analytic Hierarchy Process – a method of a multicriteria analysis of alternatives-was briefly presented. By the use of the Hierarchy Criteria Model in the way that respects all the basic characteristics that a methodology of the kind should feature in accordance with Gartner, a proposition of an IT project public value measurement methodology pattern was presented. The selection of projects with little value contribution if compared to the existing situation, the assessment of the acceptability of risk through the hierarchy structure of the value of a project and the aggregation of the value of separate PVIT dimensions is a contribution related to the methodology patterns that were surveyed.

  9. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business’...

  10. Episodic Laryngeal Breathing Disorders: Literature Review and Proposal of Preliminary Theoretical Framework.

    Science.gov (United States)

    Shembel, Adrianna C; Sandage, Mary J; Verdolini Abbott, Katherine

    2017-01-01

    The purposes of this literature review were (1) to identify and assess frameworks for clinical characterization of episodic laryngeal breathing disorders (ELBD) and their subtypes, (2) to integrate concepts from these frameworks into a novel theoretical paradigm, and (3) to provide a preliminary algorithm to classify clinical features of ELBD for future study of its clinical manifestations and underlying pathophysiological mechanisms. This is a literature review. Peer-reviewed literature from 1983 to 2015 pertaining to models for ELBD was searched using Pubmed, Ovid, Proquest, Cochrane Database of Systematic Reviews, and Google Scholar. Theoretical models for ELBD were identified, evaluated, and integrated into a novel comprehensive framework. Consensus across three salient models provided a working definition and inclusionary criteria for ELBD within the new framework. Inconsistencies and discrepancies within the models provided an analytic platform for future research. Comparison among three conceptual models-(1) Irritable larynx syndrome, (2) Dichotomous triggers, and (3) Periodic occurrence of laryngeal obstruction-showed that the models uniformly consider ELBD to involve episodic laryngeal obstruction causing dyspnea. The models differed in their description of source of dyspnea, in their inclusion of corollary behaviors, in their inclusion of other laryngeal-based behaviors (eg, cough), and types of triggers. The proposed integrated theoretical framework for ELBD provides a preliminary systematic platform for the identification of key clinical feature patterns indicative of ELBD and associated clinical subgroups. This algorithmic paradigm should evolve with better understanding of this spectrum of disorders and its underlying pathophysiological mechanisms. Copyright © 2017 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  11. Research on Writing a Project Proposal%项目申报书撰写的研究

    Institute of Scientific and Technical Information of China (English)

    李丹

    2014-01-01

    Description and analysis of the current problems in the writing project proposal. The main problems are too much research work, not enough depth, unfocused study, etc, which leads to the low quality of application proposal. This paper give improvement in the name of the project, the significance of project, methods and objectives of project, innovation of project, specific research programs of project, feasibility analysis of project, staff organization and division of project, the expected results and preliminary studies of projects, etc, which can improve the quality of application proposal.%本文阐述和分析了当前科技人员在撰写项目申报书上存在的问题,主要表现为研究内容过多、深度不够、研究重点不突出等,从而导致了申报书质量差。提出了从项目的名称、项目的研究意义和立项依据、项目的研究内容、方法及目标、项目的创新点、项目的具体研究方案、项目的可行性分析、项目内人员组织和分工、项目的前期研究基础、项目的预期成果等方面来改善申报书的质量。

  12. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Science.gov (United States)

    2010-03-08

    ... Minerals Management Service Environmental Assessment Prepared for Proposed Cape Wind Energy Project in... review and comment of an EA and Draft FONNSI prepared by MMS for the Cape Wind Energy Project proposed... Environmental Impact Statement (FEIS) for the Cape Wind Energy Project. The FEIS assessed the...

  13. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Science.gov (United States)

    2010-05-04

    ... Minerals Management Service Environmental Assessment Prepared for Proposed Cape Wind Energy Project in...), announces the availability of an EA and FONNSI for the Cape Wind Energy Project proposed for Nantucket Sound... Impact Statement (FEIS) for the Cape Wind Energy Project. The FEIS assessed the physical, biological,...

  14. SNF sludge treatment system preliminary project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    Flament, T.A.

    1998-03-03

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS.

  15. Preliminary Authorization Basis Documentation for the Proposed Bio Safety Level 3 (BSl-3) Facility

    Energy Technology Data Exchange (ETDEWEB)

    Altenbach, T J; Nguyen, S N

    2003-09-20

    Lawrence Livermore National Laboratory (LLNL) is proposing to construct a biosafety level (BSL-3) facility at Site 200 in Livermore, California. Biosafety level 3 (BSL-3) is a designation assigned by the Centers for Disease Control and Prevention (CDC) and National Institutes Health (NIH) for handling infectious organisms based on the specific microorganisms and associated operations. Biosafety levels range from BSL-1 (lowest hazard) to BSL-4 (highest hazard). Details about the BSL-3 criteria are described in the Center of Disease Control and Prevention (CDC)/National Institutes of Health (NIH)'s publication ''Biosafety Microbiological and Biomedical Laboratories'' (BMBL), 4th edition (CDC 1999): The BSL-3 facility will be built in accordance with the required BMBL guidelines. This Preliminary Authorization Basis Documentation (PABD) for the proposed BSL-3 facility has been prepared in accordance with the current contractual requirements at LLNL. This includes the LLNL Environment, Safety, and Health Manual (ES&H Manual) and applicable Work Smart Standards, including the biosafety standards, such as the aforementioned BMBL and the NIH Guidelines for Research Involving Recombinant DNA Molecules: The proposed BSL-3 facility is a 1,100 ft{sup 2}, one-story permanent prefabricated facility, which will have three individual BSL-3 laboratory rooms (one of which is an animal biosafety level-3 [ABSL-3] laboratory to handle rodents), a mechanical room, clothes-change and shower rooms, and small storage space (Figure 3.1). The BSL-3 facility will be designed and operated accordance with guidelines for BSL-3 laboratories established by the CDC and the NIH. No radiological, high explosives, fissile, or propellant material will be used or stored in the proposed BSL-3 facility. The BSL-3 facility will be used to develop scientific tools to identify and understand the pathogens of medical, environmental, and forensic importance. Microorganisms that are to

  16. Distributed Processing of Projections of Large Datasets: A Preliminary Study

    Science.gov (United States)

    Maddox, Brian G.

    2004-01-01

    Modern information needs have resulted in very large amounts of data being used in geographic information systems. Problems arise when trying to project these data in a reasonable amount of time and accuracy, however. Current single-threaded methods can suffer from two problems: fast projection with poor accuracy, or accurate projection with long processing time. A possible solution may be to combine accurate interpolation methods and distributed processing algorithms to quickly and accurately convert digital geospatial data between coordinate systems. Modern technology has made it possible to construct systems, such as Beowulf clusters, for a low cost and provide access to supercomputer-class technology. Combining these techniques may result in the ability to use large amounts of geographic data in time-critical situations.

  17. Proposal for a project agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2001-01-01

    This document concerns a project agreement with the ISTC entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medecine and Pharmacology" to be executed in co-operation with the Crystal Clear Collaboration. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a project agreement with ISTC for a total amount of 775 000 US dollars. The European Union party in ISTC will co-fund the project up to a total of 525 000 US dollars. CERN's contribution will not exceed 250 000 US dollars. At the present rate of exchange this is equivalent to approximately 430 000 Swiss francs

  18. Writing the proposal for a qualitative research methodology project.

    Science.gov (United States)

    Sandelowski, Margarete; Barroso, Julie

    2003-07-01

    Writing the proposal for a qualitative research methodology study is a double challenge because of the emergent nature of qualitative research design and because a methodology study entails describing a process to produce a process. How the authors addressed this challenge is shown in the annotated text of the grant proposal--"Analytic Techniques for Qualitative Metasynthesis"--funded by the National Institute of Nursing Research. Appealing qualitative research proposals adhere to principles that engage writers and readers in an informative and mutually respectful interaction.

  19. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  20. Preliminary Project Investigation : Holla Bend National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report covers the proposed expansion of Holla Bend National Wildlife Refuge to increase the quantity and quality of wintering habitat primarily for mallards and...

  1. 76 FR 33814 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-06-09

    ... Additional First Year Depreciation Deduction. DATES: Written comments should be received on or before August... First Year Depreciation Deduction. OMB Number: 1545-2207. Regulation Project Number: Revenue Procedure... for property to qualify for the 50-percent additional first year depreciation deduction. Section...

  2. Proposed best practice for projects that involve modelling and simulation.

    Science.gov (United States)

    O'Kelly, Michael; Anisimov, Vladimir; Campbell, Chris; Hamilton, Sinéad

    2017-03-01

    Modelling and simulation has been used in many ways when developing new treatments. To be useful and credible, it is generally agreed that modelling and simulation should be undertaken according to some kind of best practice. A number of authors have suggested elements required for best practice in modelling and simulation. Elements that have been suggested include the pre-specification of goals, assumptions, methods, and outputs. However, a project that involves modelling and simulation could be simple or complex and could be of relatively low or high importance to the project. It has been argued that the level of detail and the strictness of pre-specification should be allowed to vary, depending on the complexity and importance of the project. This best practice document does not prescribe how to develop a statistical model. Rather, it describes the elements required for the specification of a project and requires that the practitioner justify in the specification the omission of any of the elements and, in addition, justify the level of detail provided about each element. This document is an initiative of the Special Interest Group for modelling and simulation. The Special Interest Group for modelling and simulation is a body open to members of Statisticians in the Pharmaceutical Industry and the European Federation of Statisticians in the Pharmaceutical Industry. Examples of a very detailed specification and a less detailed specification are included as appendices. Copyright © 2016 John Wiley & Sons, Ltd.

  3. 77 FR 71039 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-11-28

    ... information collections, as required by the Paperwork Reduction Act of 1995, Public Law 104-13(44 U.S.C. 3506... to Qualified Investments in Foreign Base Company Shipping Operations. DATES: Written comments should... in Foreign Base Company Shipping Operations. OMB Number: 1545-0755. Regulation Project Number: LR-58...

  4. 78 FR 35660 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-06-13

    ...(c)(2)(A)). Currently, the IRS is soliciting comments concerning Roth IRAs. DATES: Written comments....gov . SUPPLEMENTARY INFORMATION: Title: Roth IRAs. OMB Number: 1545-1616. Regulation Project Numbers: TD 8816. Abstract: This collection of information contains regulations relating to Roth IRAs...

  5. 75 FR 47059 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-04

    ...-115393-98 (TD 8816), Roth IRAs (Sec. Sec. 1.408A-2, 1.408A-4, 1.408A-5 and 1.408A-7). DATES: Written... Allan.M.Hopkins@irs.gov . SUPPLEMENTARY INFORMATION: Title: Roth IRAs. ] OMB Number: 1545-1616. Regulation Project Numbers: REG-115393-98. Abstract: The regulations provide guidance on establishing...

  6. 76 FR 21427 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-15

    ... and their shareholders. DATES: Written comments should be received on or before June 14, 2011 to be... by S Corporations and Their Shareholders. OMB Number: 1545-1493. Regulation Project Number: T.D. 8684... corporations and their shareholders of gain from the disposition of natural resource recapture property...

  7. 76 FR 55741 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-09-08

    ... information collections, as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Qualified Separate Lines of Business... Business. OMB Number: 1545-1221. Regulation Project Number: EE-147-87. Abstract: Section 414(r) of...

  8. 75 FR 2932 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... regulation, REG-116664-01 (TD 9100), Guidance Necessary to Facilitate Business Electronic Filing (TD 9300... Facilitate Business Electronic Filing. OMB Number: 1545-1868. Regulation Project Number: REG-116664-01 (TD... impediments to the electronic filing of certain income tax returns and other forms. These regulations...

  9. 76 FR 2674 - Proposed Waiver and Extension of Project Period

    Science.gov (United States)

    2011-01-14

    ... to improvements in student academic achievement and help partnerships among parents, teachers... PIRC received targeted technical assistance to conduct a five-year, high-quality evaluation in order to... evaluation, each PIRC had to ensure that its services were fully implemented. For many projects, due to...

  10. 78 FR 16919 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-03-19

    ... requested in proposed sections 1.863-8(g) and 1.863-9(g) is necessary for the Service to audit taxpayers... the administration of any internal revenue law. Generally, tax returns and tax return information...

  11. Advanced Stellar Compass - Proposal for the SMART-1 Project

    DEFF Research Database (Denmark)

    Jørgensen, John Leif; Betto, Maurizio; Kilsgaard, Søren

    1998-01-01

    This proposal is the DTU response to the Swedish Space Corporation (SSC) request for proposal (r.f.p.) for the SMART-1 star tracker.SMART-1 is a small ESA scientific and technological satellite planned to be launched in late 2001.The Advanced Stellar Compass (ASC) is a highly advanced and autonom......This proposal is the DTU response to the Swedish Space Corporation (SSC) request for proposal (r.f.p.) for the SMART-1 star tracker.SMART-1 is a small ESA scientific and technological satellite planned to be launched in late 2001.The Advanced Stellar Compass (ASC) is a highly advanced...... and autonomous Stellar Reference Unit designed, developed and produced by the Space Instrumentation Group of the Department of Automation of the Technical University of Denmark.The document is structured as follows. First we present the ASC - heritage, system description, performance - then we address more...

  12. 78 FR 48230 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-07

    ... capital or start-up costs and costs of operation, maintenance, and purchase of services to provide... the proposed regulations. Current Actions: There is no change to this existing regulation. Type of...

  13. 77 FR 60420 - FFP Project 66 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 66 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 66, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  14. 77 FR 60421 - FFP Project 67 LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 67 LLC; Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 67, LLC filed an application for a preliminary permit, pursuant to section 4(f)...

  15. 77 FR 60423 - FFP Project 71 LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 71 LLC; Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 71, LLC filed an application for a preliminary permit, pursuant to section 4(f)...

  16. 77 FR 60421 - FFP Project 68 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 68 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 68, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  17. 77 FR 60423 - FFP Project 72 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 72 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 72, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  18. 77 FR 60422 - FFP Project 63 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 63 LLC; Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 63, LLC filed an application for a preliminary permit, pursuant to section 4(f)...

  19. 77 FR 60422 - FFP Project 69 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 69 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 69, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  20. 75 FR 30846 - Notice of Proposed Information Collection: Comment Request; Multifamily Project Monthly...

    Science.gov (United States)

    2010-06-02

    ... Monthly Accounting Reports AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION: Notice... also lists the following information: Title of Proposal: Multifamily Project Monthly Accounting...

  1. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  2. Preliminary Design Report for the Yakima/Klickitat Production Project; Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration.

    1990-03-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Agreement on a refined statement of project goals. Completion of a technical analysis of water supplies. Completion of an experimental design plan. Development of a harvest management plan. Assessment of potential genetic risks. Project coordination with all other affected parties. Submission of a preliminary design report to the Council. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  3. Major Modification Determination Process Utilized for Proposed Idaho National Laboratory Projects

    Energy Technology Data Exchange (ETDEWEB)

    Michael A. Lehto, Ph.D.; Boyd D. Christensen

    2008-05-01

    Over the past three years, several new projects with the potential for major modifications to existing facilities have been considered for implementation at the Idaho National Laboratory (INL). These projects were designated to take place in existing nuclear facilities with existing documented safety analyses. 10 CFR 830.206 requires the contractor for a major modification to a Hazard Category 1, 2, or 3 nuclear facility to obtain Department of Energy (DOE) approval for the nuclear facility design criteria to be used for preparation of a preliminary documented safety analysis (PDSA), as well as creation and approval of the PDSA, before the contractor can procure materials or components or begin construction on the project. Given the significant effort and expense of preparation and approval of a PDSA, a major modification determination for new projects is warranted to determine if the rigorous requirements of a major modification are actually required. Furthermore, performing a major modification determination helps to ensure that important safety aspects of a project are appropriately considered prior to modification construction or equipment procurement. The projects considered for major modification status at the INL included: treatment and packaging of unirradiated, sodium-bonded highly enriched uranium (HEU) fuel and miscellaneous casting scrap in the Materials and Fuels Complex (MFC) Fuel Manufacturing Facility (FMF); post irradiation examination of Advance Fuel Cycle Initiative (AFCI) fuel in the MFC Analytical Laboratory (AL); the Advanced Test Reactor (ATR) gas test loop (GTL); and the hydraulic shuttle irradiation system (HSIS) at ATR. The major modification determinations for three of the proposed projects resulted in a negative major modification. On the other hand, the major modification determination for the GTL project concluded that the project would require a major modification. This paper discusses the process, methods, and considerations used by

  4. 76 FR 32971 - Proposed Priority for the Disability and Rehabilitation Research Projects and Centers Program

    Science.gov (United States)

    2011-06-07

    ... and Rehabilitation Research Project (DRRP)--Center on Knowledge Translation for Disability and... notice proposes a priority for a center on knowledge translation for disability and rehabilitation... This notice contains one proposed priority. Center on Knowledge Translation for Disability...

  5. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  6. 76 FR 13450 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2011-03-11

    ... information collections, as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506... to section 83 of the Code and provide rules for coordinating section 83 with partnership taxation principles. Current Actions: There is no change to this proposed regulation. Type of Review: Extension of...

  7. Advanced Stellar Compass - Proposal for the LunARSat project

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Kilsgaard, Søren;

    1998-01-01

    request for proposal (r.f.p.) for the LunARSat star tracker.The Advanced Stellar Compass (ASC) is a highly advanced and autonomous Stellar Reference Unit designed, developed and produced by the Space Instrumentation Group of the Department of Automation of the Technical University of Denmark.The document...

  8. 75 FR 5864 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-02-04

    ... requested in proposed sections 1.863-8(g) and 1.863-9(g) is necessary for the Service to audit taxpayers... the administration of any internal revenue law. Generally, tax returns and tax return information are... information. Approved: January 15, 2010. R. Joseph Durbala, IRS Supervisory Tax Analyst. BILLING CODE...

  9. 78 FR 66423 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of the...(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing notice of proposed rulemaking and temporary regulation, REG- 135898-04 (TD 9154), Extension of Time to Elect Method...

  10. 75 FR 56659 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2010-09-16

    ... Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of the...(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing notice of proposed rulemaking and temporary regulation, REG- 135898-04 (TD 9154), Extension of Time to Elect Method...

  11. Advanced Stellar Compass - Proposal for the LunARSat project

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Kilsgaard, Søren

    1998-01-01

    LunARSat, the Lunar Academic and Research Satellite, is an ESA micro-spacecraft that will be sent into an orbit around the Moon to perform scientific investigations concerning the lunar environment and its characteristics.This proposal is the DTU response to the Technical University of Münich...

  12. Tackling teenage obesity: literature review and project proposal

    OpenAIRE

    McDermott, Mark R.; Potton, Anita

    2008-01-01

    The aim of this report is to assess the available scientific literature which examines predictors of obesity in 11-18 years, with specific reference to the East London\\ud region, and in particular in relation to the boroughs of Barking and Dagenham (B&D).\\ud Through such examination this report thereafter aims to formulate a proposal for an intervention with this age-group in order to reduce the prevalence and incidence of\\ud obesity in teenagers.

  13. The HCV Synthesis Project: Scope, methodology, and preliminary results

    Directory of Open Access Journals (Sweden)

    Scheinmann Roberta

    2008-09-01

    Full Text Available Abstract Background The hepatitis C virus (HCV is hyper-endemic in injecting drug users. There is also excess HCV among non-injection drug users who smoke, snort, or sniff heroin, cocaine, crack, or methamphetamine. Methods To summarize the research literature on HCV in drug users and identify gaps in knowledge, we conducted a synthesis of the relevant research carried out between 1989 and 2006. Using rigorous search methods, we identified and extracted data from published and unpublished reports of HCV among drug users. We designed a quality assurance system to ensure accuracy and consistency in all phases of the project. We also created a set of items to assess study design quality in each of the reports we included. Results We identified 629 reports containing HCV prevalence rates, incidence rates and/or genotype distribution among injecting or non-injecting drug user populations published between January 1989 and December 2006. The majority of reports were from Western Europe (41%, North America (26%, Asia (11% and Australia/New Zealand (10%. We also identified reports from Eastern Europe, South America, the Middle East, and the Caribbean. The number of publications reporting HCV rates in drug users increased dramatically between 1989 and 2006 to 27–52 reports per year after 1998. Conclusion The data collection and quality assurance phases of the HCV Synthesis Project have been completed. Recommendations for future research on HCV in drug users have come out of our data collection phase. Future research reports can enhance their contributions to our understanding of HCV etiology by clearly defining their drug user participants with respect to type of drug and route of administration. Further, the use of standard reporting methods for risk factors would enable data to be combined across a larger set of studies; this is especially important for HCV seroconversion studies which suffer from small sample sizes and low power to examine risk

  14. 75 FR 44053 - Proposed Collection; Comment Request: CDFI/CDE Project Profiles Web Form

    Science.gov (United States)

    2010-07-27

    ... description may be for a project previously reported to the CDFI Fund through the Community Investment Impact... Community Development Financial Institutions Fund Proposed Collection; Comment Request: CDFI/CDE Project... concerning the CDFI/CDE Project Profile Web Form, a voluntary information collection effort involving...

  15. Preliminary findings from the Oranga Niho dental student outplacement project.

    Science.gov (United States)

    Anderson, V R; Rapana, S T; Broughton, J R; Seymour, G J; Rich, A M

    2015-03-01

    To examine stakeholder perspectives of the Bachelor of Dental Surgery 2012-2013 clinical outplacement programme with Māori Oral Health Providers (MOHPs) and inform the programme's ongoing development. A mixed methods kaupapa Māori action research project. Six North Island MOHPs and the University of Otago Faculty of Dentistry. Online questionnaires were used to conduct a pre- and post-outplacement survey of dental students and a twice-yearly survey of all MOHP-based clinical supervisors. Paper questionnaires were used to survey adult clients and caregivers of child clients that the students treated. Data were analysed descriptively and thematically. 68 (61%) of the 112 eligible students completed the pre- and post-outplacement questionnaires; 31 clinical supervisor questionnaire responses were received representing all six MOHPs; and 426 client and 130 caregiver questionnaire responses were received from five MOHPs. 79% of students felt well prepared for outplacement and 75% indicated that they would consider working for a MOHP in future. Of the clinical supervisors, 93% indicated that the students were adequately prepared for outplacement, and 68%, that they would recommend one or more students for employment. However, 58% associated the outplacements with decreased productivity. More than 97% of adult clients and caregivers of child clients were pleased with the care that the students provided. Recommendations for strengthening the outplacement programme included: increasing communication between the Faculty, MOHPs and students; addressing the financial cost of the programme to the MOHPs; and providing more support for clinical supervisors.

  16. Farm Fuel Alcohol Project: preliminary report on facility design

    Energy Technology Data Exchange (ETDEWEB)

    Pile, R S; Badger, P C; Roetheli, J C; Waddell, Jr, E L

    1979-09-01

    This report describes the design of a farm-based ethanol production system to be built by TVA at Muscle Shoals, Alabama. This facility will include cooking, fermentation, and distillation equipment to allow production of 8000 to 12,000 gallons of fuel ethanol during a three to four month period each year. Output will be about 10 gallons of 190-proof ethanol per hour. Present components are sized to allow 12 to 14 hour daily operation as a semi-continuous batch system. Intent of the project is to document equipment and energy requirements, ethanol yields, and feasibility of small farm-based ethanol plants for farm fuel self-sufficiency. Cooking and fermentation will be batch-type operations, and packed distillation columns will be used for separating ethanol from the fermented beer. Energy recovery and waste heat use are integrated when feasible. The fermented beer will be fed directly to the distillation columns without separation of solids. Although this is an area of concern, an economical method of separation could not be identified.

  17. New construction of the Kelchbach hydropower installation - Preliminary project; Vorprojekt Neubau Kraftwerk Kelchbach. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Kalbermatten, J.

    2009-09-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes the preliminary project for the new construction of a small hydropower installation on the Kelchbach stream in Naters, Switzerland. After a pressure-pipe rupture, the old, over 100 year-old installation was closed down. The replacement installation is planned to increase power production. The works necessary for the realisation of this hydropower project are described and discussed. Several older studies on the replacement of the installation are listed. Three variants are presented and discussed as are hydrological data on the project. Cost estimates are presented and discussed. Estimates of energy production are also presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also examined.

  18. The Proposal of Scaling the Roles in Scrum of Scrums for Distributed Large Projects

    Directory of Open Access Journals (Sweden)

    Abeer M. AlMutairi

    2015-07-01

    Full Text Available Scrum of scrums is an approach used to scale the traditional Scrum methodology to fit for the development of complex and large projects. However, scaling the roles of scrum members brought new challenges especially in distributed and large software projects. This paper describes in details the roles of each scrum member in scrum of scrum to propose a solution to use a dedicated product owner for a team and inclusion of sub-backlog. The main goal of the proposed solution is to optimize the role of product owner for distributed large projects. The proposed changes will increase cohesiveness among scrum teams and it will also eliminate duplication of work. Survey is used as a research design to evaluate the proposed solution. The results are found encouraging supporting the proposed solution. It is anticipated that the proposed solution will help the software companies to scale Scrum methodology effectively for large and complex software projects.

  19. Preliminary mapping of surficial geology of Midway Valley Yucca Mountain Project, Nye County, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Wesling, J.R.; Bullard, T.F.; Swan, F.H.; Perman, R.C.; Angell, M.M. [Geomatrix Consultants, Inc., San Francisco, CA (United States); Gibson, J.D. [Sandia National Labs., Albuquerque, NM (United States)

    1992-04-01

    The tectonics program for the proposed high-level nuclear waste repository at Yucca Mountain in southwestern Nevada must evaluate the potential for surface faulting beneath the prospective surface facilities. To help meet this goal, Quaternary surficial mapping studies and photolineament analyses were conducted to provide data for evaluating the location, recency, and style of faulting with Midway Valley at the eastern base of Yucca Mountain, the preferred location of these surface facilities. This interim report presents the preliminary results of this work.

  20. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...... of the project, the focus is on the regional extend of diurnal variability. Particularly, extensive sensitivity tests regarding the definition of SSTfound fields show that using only quality 5 SEVIRI data results in warmer foundation fields SSTfound while there is an added ∼0.2 K variability when using multi...... Ocean Turbulence Model (GOTM) is applied. Preliminary results show that the initial temperature profiles may give a warmer start-up in the model while the light extinction scheme is a controlling factor for the amplitude and vertical extend of the daily signal....

  1. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  2. SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELIMINARY DESIGN HAZARD ANALYSIS SUPPLEMENT 1

    Energy Technology Data Exchange (ETDEWEB)

    FRANZ GR; MEICHLE RH

    2011-07-18

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  3. 76 FR 48853 - FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-08-09

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May...

  4. Social impact assessment of the proposed Dodds-RoundHill coal gasification project : project report : executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Parkins, J.R. (ed.)

    2009-07-01

    A public disclosure document was released for a proposed Dodds-RoundHill coal gasification project in January 2007, and the project was placed on hold in 2008 given some uncertainty around its future. However, there was a general sense that a project of this nature would be proposed for this coal-rich region at some point in the future. This report presented the results of a project completed by 14 graduate and undergraduate students in a social impact assessment course in 2009 at the University of Alberta. The purpose of the project was to learn specific concepts and methods for social impact assessment by undertaking such an assessment for the proposed Dodds-RoundHill coal gasification project, located southeast of Edmonton, Alberta. The 4 major components of a social impact assessment include scoping of relevant social indicators; social impacts within municipalities; social impacts within the farming region; and a comparative case study of social impacts. All of the research participants indicated that the project would have an impact on their community.

  5. The Proposal of Scaling the Roles in Scrum of Scrums for Distributed Large Projects

    OpenAIRE

    Abeer M. AlMutairi; M. Rizwan Jameel Qureshi

    2015-01-01

    Scrum of scrums is an approach used to scale the traditional Scrum methodology to fit for the development of complex and large projects. However, scaling the roles of scrum members brought new challenges especially in distributed and large software projects. This paper describes in details the roles of each scrum member in scrum of scrum to propose a solution to use a dedicated product owner for a team and inclusion of sub-backlog. The main goal of the proposed solution i...

  6. Immigration, health and diversity management: Preliminary developments of a project in neighborhoods of Catalonia

    Directory of Open Access Journals (Sweden)

    Dan Rodríguez-García

    2007-09-01

    Full Text Available This article presents an ongoing research project on immigration, health, and socio-cultural diversity , and offers preliminary information on the theoretical and socio-demographic context of this investigation. The objective of the project, funded by the Department of Health of the Autonomous Government of Catalonia, Spain, is to analyse the socioeconomic and cultural factors involved in health and the access to the formal health system of a few major migrant communities and ethnic minorities living in high-priority neighbourhoods in Catalonia. The results of this project, which will come fundamentally from ethnographic research, aim to give suggestions for improving health conditions for the population and to provide to those professionals working in the public health care system with some conceptual and practical tools for improving intercultural communication between themselves and their patients, as well as for detecting, preventing, and resolving problems in everyday practice.

  7. Proposal to market Provo River Project power, Salt Lake City area

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations`s proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations.

  8. A Proposal to Manage Lessons Learned in Projects: Web 2.0 Technologies to Promote Innovation

    Directory of Open Access Journals (Sweden)

    Marcirio Silveira Chaves

    2014-06-01

    Full Text Available The web 2.0 is transforming the project management in organizations by improving communication and collaboration. The new generation of web-based collaborative tools provides much better experience than the traditional software package allowing document sharing, integrated task tracking, enforcing team processes and agile planning. Despite of the indubitable benefits brought by web 2.0, the use of these technologies to promote knowledge management remains unexplored. For many project managers to obtain and integrate information from different tools of previous similar projects in global organizations remains a challenge. This theoretical paper presents a proposal that suggests an innovation in the knowledge management area applying web 2.0 technologies. The main goal is to provide an integrated vision of a set of technologies that could be used by organizations in order to promote better management of lessons learned. The proposal includes the lessons learned processes (e.g. capture, share and dissemination, the process-based (e.g. project review and after action review and documentation-based (e.g. micro article and learning histories methods. Results show how web 2.0 technologies can help project managers and team project to cope with the main lessons learned processes and methods to learn from experience. Moreover, recommendations are made for the effective use of web 2.0 components promoting innovation and supporting lessons learned management in projects.Keywords: Project management; Lessons learned processes; lessons learned methods; project learning; web 2.0 technologies; innovation.

  9. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  10. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    ... Energy Regulatory Commission Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing... Competing Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit... 8:30 a.m. on the next regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund...

  11. EUBerry: Competitiveness and marketing strategies of sustainable berries validated for improved health benefits - Introduction to the project and preliminary results

    NARCIS (Netherlands)

    Groot, M.J.; Roelofs, P.F.M.M.; Kaim, E.; Sijtsema, S.J.; Zimmermann, K.L.; Zmarlicki, K.

    2014-01-01

    The EUBerry project is not only building on technical research but also studies berry production and consumption from a social sciences perspective. This paper aims to describe the approach used in the EUBerry project about business economics as well as marketing. In addition some preliminary

  12. 45 CFR 2102.10 - Timing, scope and content of submissions for proposed projects involving land, buildings, or...

    Science.gov (United States)

    2010-10-01

    ... proposed projects involving land, buildings, or other structures. 2102.10 Section 2102.10 Public Welfare... for proposed projects involving land, buildings, or other structures. (a) A party proposing a project... historical information about the building or other structure to be altered or razed; (ii) The identity of the...

  13. SolarOil Project, Phase I preliminary design report. [Solar Thermal Enhanced Oil Recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Baccaglini, G.; Bass, J.; Neill, J.; Nicolayeff, V.; Openshaw, F.

    1980-03-01

    The preliminary design of the Solar Thermal Enhanced Oil Recovery (SolarOil) Plant is described in this document. This plant is designed to demonstrate that using solar thermal energy is technically feasible and economically viable in enhanced oil recovery (EOR). The SolarOil Plant uses the fixed mirror solar concentrator (FMSC) to heat high thermal capacity oil (MCS-2046) to 322/sup 0/C (611/sup 0/F). The hot fluid is pumped from a hot oil storage tank (20 min capacity) through a once-through steam generator which produces 4.8 MPa (700 psi) steam at 80% quality. The plant net output, averaged over 24 hr/day for 365 days/yr, is equivalent to that of a 2.4 MW (8.33 x 10/sup 6/ Btu/hr) oil-fired steam generator having an 86% availability. The net plant efficiency is 57.3% at equinox noon, a 30%/yr average. The plant will be demonstrated at an oilfield site near Oildale, California.

  14. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.C.

    1994-10-18

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue.

  15. Working With People (WWP) in Rural Development Projects: a Proposal from Social Learning

    OpenAIRE

    Cazorla, Adolfo; De los Ríos, Ignacio; Salvo, Miguel

    2013-01-01

    This paper shows a conceptual framework which synthesizes the evolution of the “modern project” and its dominant values, reaching to a new approach for the planning of rural development projects in the post-modernity: Working With People (WWP). The WWP model proposed is integrated into international discussions of “social learning” and it incorporates key elements of planning as social learning, collaborative participation theory and project management models. WWP is the result of 25 years of...

  16. Systematic Approach to Formulate PSS Development Project Proposals in the Fuzzy Front End

    DEFF Research Database (Denmark)

    Barquet, Ana Paula B.; Pigosso, Daniela Cristina Antelmi; Rozenfeld, Henrique

    2013-01-01

    patterns adopted for product development. Currently, there is not a systematic approach that can be followed for the formulation of PSS proposals in the fuzzy front end. Therefore, the aim of this research is to develop a method for defining PSS project proposals based on attributes that should...... be considered by companies during this definition. The systematization of PSS attributes may help increase the knowledge about different PSS projects that can emerge in the front end, thus leading to the discovery of opportunities that are not apparent in the existing business models and give rise to new ideas...

  17. Systematic Approach to Formulate PSS Development Project Proposals in the Fuzzy Front End

    DEFF Research Database (Denmark)

    Barquet, Ana Paula B.; Pigosso, Daniela Cristina Antelmi; Rozenfeld, Henrique

    2013-01-01

    patterns adopted for product development. Currently, there is not a systematic approach that can be followed for the formulation of PSS proposals in the fuzzy front end. Therefore, the aim of this research is to develop a method for defining PSS project proposals based on attributes that should...... be considered by companies during this definition. The systematization of PSS attributes may help increase the knowledge about different PSS projects that can emerge in the front end, thus leading to the discovery of opportunities that are not apparent in the existing business models and give rise to new ideas...

  18. Research in human performance related to space: A compilation of three projects/proposals

    Science.gov (United States)

    Hasson, Scott M.

    1989-01-01

    Scientific projects were developed in order to maximize performance in space and assure physiological homeostatis upon return. Three projects that are related to this common goal were either initiated or formulated during the Faculty Fellowship Summer Program. The projects were entitled: (1) Effect of simulated weightlessness (bed rest) on muscle performance and morphology; (2) Effect of submaximal eccentric muscle contractions on muscle injury, soreness and performance: A grant proposal; and (3) Correlation between isolated joint dynamic muscle strength to end-effector strength of the push and pull extravehicular activity (EVA) ratchet maneuver. The purpose is to describe each of these studies in greater detail.

  19. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Pick-Sloan Missouri... Reclamation (Reclamation) is proposing a rate adjustment (proposed rate) for Project Use Power for the...

  20. Preliminary geophysical, geohazard, and geomorphic mapping of the Alpine Fault Deep Fault Drilling Project (DFDP), Gaunt Creek, New Zealand

    Science.gov (United States)

    de Pascale, G. P.; Davies, T.; Nobes, D. C.; Quigley, M.; Sutherland, R.; Toy, V. G.; Norris, R. J.; Langridge, R. M.; Stahl, T.; Klahn, A.; Townend, J.

    2010-12-01

    In central South Island, the dextral-reverse Alpine Fault Zone (AFZ) forms the major plate boundary structure between the Pacific and Australian plates. The AFZ is thought to fail in large earthquakes (~ Mw 7-8) approximately every 200 to 400 years, to have last ruptured in 1717 and is associated with high rates of strain release and exhumation. The AFZ is the target of a multidisciplinary proposal called the Deep Fault Drilling Project or DFDP which proposes to drill, retrieve core, and test subsurface conditions of the AFZ from a shallow, Vegetation colonization (reflecting recent flooding) and presence of boulders and landslide debris were used to select sites. Over 600 m of ground penetrating radar (GPR) transects using a 50 MHz antenna, and 400 m of electrical resistivity data, were collected along the Late-Holocene alluvial fans to map subsurface stratigraphy. Preliminary GPR results show fluvial stratigraphy, bedrock contacts and faults in bedrock and sediments between 0 and 25 m below ground surface at Gaunt Creek. Electrical resistivity data imaged to 10 m. Geomorphic mapping (including fault trace mapping, terrace mapping, and surficial geological mapping) was integrated with geophysical data, LiDAR, and previous research at the site to determine optimum sites for DFDP drilling in early 2011. Ages of faulted deposits, and thus of fault offsets, will be obtained by radiocarbon dating, dendrochronology and/or OSL ages to better characterise recent earthquakes at Gaunt Creek. Though preliminary, this research is significant because it provides critical input parameters to the DFDP, helps define the most recent dynamics of the fault, and possibly refine slip-rates and recurrence estimates of the AFZ.

  1. Climate Change Impact on Hydrological Extremes: Preliminary Results from the Polish-Norwegian Project

    Science.gov (United States)

    Romanowicz, Renata J.; Bogdanowicz, Ewa; Debele, Sisay E.; Doroszkiewicz, Joanna; Hisdal, Hege; Lawrence, Deborah; Meresa, Hadush K.; Napiórkowski, Jarosław J.; Osuch, Marzena; Strupczewski, Witold G.; Wilson, Donna; Wong, Wai Kwok

    2016-04-01

    This paper presents the background, objectives, and preliminary outcomes from the first year of activities of the Polish-Norwegian project CHIHE (Climate Change Impact on Hydrological Extremes). The project aims to estimate the influence of climate changes on extreme river flows (low and high) and to evaluate the impact on the frequency of occurrence of hydrological extremes. Eight "twinned" catchments in Poland and Norway serve as case studies. We present the procedures of the catchment selection applied in Norway and Poland and a database consisting of near-natural ten Polish and eight Norwegian catchments constructed for the purpose of climate impact assessment. Climate projections for selected catchments are described and compared with observations of temperature and precipitation available for the reference period. Future changes based on those projections are analysed and assessed for two periods, the near future (2021-2050) and the far-future (2071-2100). The results indicate increases in precipitation and temperature in the periods and regions studied both in Poland and Norway.

  2. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  3. 76 FR 16391 - Call for Innovative National Environmental Policy Act (NEPA) Pilot Project Proposals

    Science.gov (United States)

    2011-03-23

    ... QUALITY Call for Innovative National Environmental Policy Act (NEPA) Pilot Project Proposals AGENCY: Council On Environmental Quality. ACTION: Notice of Availability, Call for Innovative National..., or excessively burdensome. 76 FR 3821, Jan. 21, 2011; 40 CFR 1500-1508. DATES: The Call...

  4. 64 FR 63330 - Proposed Replacement of Wright Water Distribution Looping Project

    Science.gov (United States)

    1999-11-19

    ... Office of Surface Mining Reclamation and Enforcement Proposed Replacement of Wright Water Distribution... the Abandoned Mine Reclamation Fund to pay the cost of replacing the Wright Water Distribution Looping... may read the grant application for funding the Wright Water Distribution Looping Project. It also sets...

  5. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... crossover connecting the pocket track with Main Line track, replace the Colonial Road Bridge, and correct... the project. These modifications resulted from refinements to design and efforts to reduce cost, to..., documenting any potential environmental impacts from the proposed design changes. Issued on: April 16,...

  6. 42 CFR 52h.11 - What are the review criteria for contract projects and proposals?

    Science.gov (United States)

    2010-10-01

    ... carrying out its review of a project concept under § 52h.10(a) or § 52h.10(b), the peer review group shall... its review of unsolicited contract proposals under § 52h.9, the peer review group shall take into... HUMAN SERVICES GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND...

  7. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6: simulation design and preliminary results

    Directory of Open Access Journals (Sweden)

    B. Kravitz

    2015-06-01

    simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1 GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  8. Project Overview: Cumulus Humilis Aerosol Processing Study (CHAPS): Proposed Summer 2007 ASP Field Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Berkowitz, Carl M.; Berg, Larry K.; Ogren, J. A.; Hostetler, Chris A.; Ferrare, Richard

    2006-05-18

    This white paper presents the scientific motivation and preliminary logistical plans for a proposed ASP field campaign to be carried out in the summer of 2007. The primary objective of this campaign is to use the DOE Gulfstream-1 aircraft to make measurements characterizing the chemical, physical and optical properties of aerosols below, within and above large fields of fair weather cumulus and to use the NASA Langley Research Center’s High Spectral Resolution Lidar (HSRL) to make independent measurements of aerosol backscatter and extinction profiles in the vicinity of these fields. Separate from the science questions to be addressed by these observations will be information to add in the development of a parameterized cumulus scheme capable of including multiple cloud fields within a regional or global scale model. We will also be able to compare and contrast the cloud and aerosol properties within and outside the Oklahoma City plume to study aerosol processes within individual clouds. Preliminary discussions with the Cloud and Land Surface Interaction Campaign (CLASIC) science team have identified overlap between the science questions posed for the CLASIC Intensive Operation Period (IOP) and the proposed ASP campaign, suggesting collaboration would benefit both teams.

  9. How an impact plan can build on the success of your project - from proposal to legacy

    Science.gov (United States)

    Alexiou, Sofia

    2017-04-01

    Research Impact is often defined as the 'demonstrable contribution that excellent research makes to society and the economy'. Impact is important as it demonstrates the value of funding agencies' investment into science. Measuring impact is an essential part of project management, from proposal phase to output. However, impact can mean a range of things to different people and organisations. When applying for funding, it is critical to check and understand the type of impact recognised by the relevant funder and to consider opportunities for building in multiple benefits . In 2015, it was observed that the drive to 'get stricter on impact' had a direct effect on the evaluators' instructions and subsequent proposal ratings. As funding agencies are reshaping assessment processes and implementing new indicators of impact and new innovation actions, it is clear that a need to demonstrate performance, impact and added-value must be included within the proposal phase and executed throughout project lifetime.

  10. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects.

    Science.gov (United States)

    Shin, Yoonseok

    2015-01-01

    Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  11. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  12. A preliminary examination of audience-related communications issues for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.

    1991-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation doses people may have received from exposure to radioactive materials released during past operations at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project was initiated in response to public concerns about possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to effectively communicate to the many different concerned audiences. Accordingly, the TSP directed PNL to examine methods for communicating causes and effects of uncertainties in the dose estimates. After considering the directive and discussing it with the Communications Subcommittee of the TSP, PNL undertook a broad investigation of communications methods to consider for inclusion in the TSP's current communications program. As part of this investigation, a literature review was conducted regarding risk communications. A key finding was that, in order to successfully communicate risk-related information, a thorough understanding of the knowledge level, concerns and information needs of the intended recipients (i.e., the audience) is necessary. Hence, a preliminary audience analysis was conducted as part of the present research. This report summarizes the results of this analysis. 1 ref., 9 tabs.

  13. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  14. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  15. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  16. On preliminary budget compilation of architectural projects%论建筑工程概预算编制问题

    Institute of Scientific and Technical Information of China (English)

    孔小芳

    2015-01-01

    The paper illustrates the definition of the preliminary budget in architectural projects and its included contents,analyzes some existing problems in its compilation of the architectural project,and points out the advanced preliminary budget method can be adopted for observing the market,so it is the solutions to improving preliminary budget compilation system,in order to ensured engineering quality improving.%对建筑工程概预算的定义及内容进行了阐述,并对建筑工程概预算编制存在的问题作了分析,提出了洞察市场、采用先进的概预算方法、健全概预算编制制度等解决措施,以确保工程质量的提高。

  17. Preliminary archaeological survey of proposed gas well locations in Green Township (Scioto County) and Elizabeth Township (Lawrence County) Ohio

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.B.; Peebles, C.S.; Zielinski, R.E.

    1978-10-24

    The present archaeological survey and cultural resource assessment were conducted for the United States Department of Energy, Morgantown Energy Technology Center in areas to be disturbed by gas well drilling and holding pond construction. The project area is the Pine Creek drainage system, which is a tributary of the Ohio River in Scioto and Lawrence Counties, Ohio. The literature search indicated that prehistoric archaeological sites do occur and have been documented in the Pine Creek drainage system. Presently, no archaeological sites have been reported in locations of direct impact. The literature search also indicated that historic features from the early iron industry period, ca. 1840 to 1870, are likely to occur throughout the project area. Field reconnaissance identified three prehistoric archaeological sites and one historic site in and adjacent to the proposed locations of disturbance. Two sites were determined to be of significant research value and may be nominated to the National Register of Historic Places. Consequently, recommendations were made to minimize the adverse effects of the proposed drilling project on these archaeological sites.

  18. 77 FR 31610 - FFP Project 110, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-05-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 110, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 1, 2012, the...

  19. 78 FR 18335 - FFP Project 121, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-03-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 121, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2013,...

  20. Evaluation of dredged material proposed for ocean disposal from Eastchester Project Area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Antrim, L.D.; Pinza, M.R.; Barrows, E.S.; Gardiner, W.W.; Tokos, J.J.S.; Gruendell, B.D.; Word, J.Q. [Battelle Marine Research Lab., Sequim, WA (United States)

    1996-07-01

    The objective of the Eastchester project (Federal Project [FP] No. 6) was to evaluate proposed dredged material from the Eastchester project area in the Hutchinson River to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Eastchester was one of seven waterways that the U. S. Army Corps of Engineers-New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in March 1994. The evaluation of proposed dredged material from the Eastchester project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water- column and benthic acute toxicity tests, and bioaccumulation studies. Eighteen individual sediment core samples collected from the Eastchester project area were analyzed for grain size, moisture content, and total organic carbon (TOC). Two composite sediment samples, representing the upstream and lower reaches of the area proposed for dredging, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4- dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the two Eastchester sediment composites, were analyzed for metals, pesticides, and PCBS. An additional 1 1 composite samples were created for the USACE-New England Division (USACE-NED) using the same 18 Eastchester core samples but combined into different composites. These composites were analyzed for metals, chlorinated pesticides, PCB congeners, PAHS, and 1,4-dichlorobenzene. Water-column or SPP toxicity tests were performed along with bioaccumulation tests.

  1. Telescopio San Pedro Mártir Observatory preliminary design and project approach

    Science.gov (United States)

    Teran, Jose; Lee, William H.; Richer, Michael G.; Sánchez, Beatriz S.; Urdaibay, David; Hill, Derek; Adriaanse, David; Hernandez-Limonchi, Regina

    2016-07-01

    The Instituto de Astronomia of the Universidad Nacional Autónoma de México (UNAM) along with Instituto Nacional de Astrofisica, Optica y Electronica, the University of Arizona and the Smithsonian Astrophysical Observatory are developing the Telescopio San Pedro Mártir (TSPM) project, a 6.5m diameter optical telescope. M3 Engineering and Technology Corp. (M3) is the design and construction management firm responsible for all site infrastructure, enclosure and support facilities. The Telescopio San Pedro Mártir project (TSPM) will be located within the San Pedro Mártir National Park in Baja California, Mexico at 2,830 m. above sea level, approximately 65 km. east of the Pacific Ocean, 55km west of the Sea of Cortes (Gulf of California) and 180km south of the United States and México border. The aim of the paper is to present the preliminary design of the site infrastructure, enclosure and support facilities to date and share the design and construction approach.

  2. Ocean thermal energy conversion cold water pipe preliminary design project. Task 2. Analysis for concept selection

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    The successful performance of the CWP is of crucial importance to the overall OTEC system; the pipe itself is considered the most critical part of the entire operation. Because of the importance the CWP, a project for the analysis and design of CWP's was begun in the fall of 1978. The goals of this project were to study a variety of concepts for delivering cold water to an OTEC plant, to analyze and rank these concepts based on their relative cost and risk, and to develop preliminary design for those concepts which seemed most promising. Two representative platforms and sites were chosen: a spar buoy of a Gibbs and Cox design to be moored at a site off Punta Tuna, Puerto Rico, and a barge designed by APL/Johns Hopkins University, grazing about a site approximately 200 miles east of the coast of Brazil. The approach was to concentrate on the most promising concepts and on those which were either of general interest or espoused by others (e.g., steel and concrete concepts). Much of the overall attention, therefore, focused on analyzing rigid and compliant wall design, while stockade (except for the special case of the FRP stockade) and bottom-mounted concepts received less attention. A total of 67 CWP concepts were initially generated and subjected to a screening process. Of these, 16 were carried through design analysis, costing, and ranking. Study results are presented in detail. (WHK)

  3. Evaluation of dredged material proposed for ocean disposal from Arthur Kill Project Area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Gruendell, B.D.; Barrows, E.S.; Borde, A.B. [Battelle Marine Sciences Lab., Sequim, WA (United States)

    1997-01-01

    The objective of the bioassay reevaluation of Arthur Kill Federal Project was to reperform toxicity testing on proposed dredged material following current ammonia reduction protocols. Arthur Kill was one of four waterways sampled and evaluated for dredging and disposal in April 1993. Sediment samples were recollected from the Arthur Kill Project areas in August 1995. Tests and analyses were conducted according to the manual developed by the USACE and the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the {open_quotes}Green Book,{close_quotes} and the regional manual developed by the USACE-NYD and EPA Region II, Guidance for Performing Tests on Dredged Material to be Disposed of in Ocean Waters. The reevaluation of proposed dredged material from the Arthur Kill project areas consisted of benthic acute toxicity tests. Thirty-three individual sediment core samples were collected from the Arthur Kill project area. Three composite sediments, representing each reach of the area proposed for dredging, was used in benthic acute toxicity testing. Benthic acute toxicity tests were performed with the amphipod Ampelisca abdita and the mysid Mysidopsis bahia. The amphipod and mysid benthic toxicity test procedures followed EPA guidance for reduction of total ammonia concentrations in test systems prior to test initiation. Statistically significant acute toxicity was found in all Arthur Kill composites in the static renewal tests with A. abdita, but not in the static tests with M. bahia. Statistically significant acute toxicity and a greater than 20% increase in mortality over the reference sediment was found in the static renewal tests with A. abdita. M. bahia did not show statistically significant acute toxicity or a greater than 10% increase in mortality over reference sediment in static tests. 5 refs., 2 figs., 2 tabs.

  4. Evaluation of dredged material proposed for ocean disposal from Hackensack River Project Area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Gruendell, B.D.; Barrows, E.S.; Borde, A.B. [Battelle Marine Sciences Lab., Sequim, WA (United States)

    1997-01-01

    The objective of the bioassay reevaluation of the Hackensack River Federal Project was to reperform toxicity testing on proposed dredged material with current ammonia reduction protocols. Hackensack River was one of four waterways sampled and evaluated for dredging and disposal in April 1993. Sediment samples were re-collected from the Hackensack River Project area in August 1995. Tests and analyses were conducted according to the manual developed by the USACE and the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the {open_quotes}Green Book,{close_quotes} and the regional manual developed by the USACE-NYD and EPA Region II, Guidance for Performing Tests on Dredged Material to be Disposed of in Ocean Waters. The reevaluation of proposed dredged material from the Hackensack River project area consisted of benthic acute toxicity tests. Thirty-three individual sediment core samples were collected from the Hackensack River project area. Three composite sediments, representing each reach of the area proposed for dredging, were used in benthic acute toxicity testing. Benthic acute toxicity tests were performed with the amphipod Ampelisca abdita and the mysid Mysidopsis bahia. The amphipod and mysid benthic toxicity test procedures followed EPA guidance for reduction of total ammonia concentrations in test systems prior to test initiation. Statistically significant acute toxicity was found in all three Hackensack River composites in the static renewal tests with A. abdita, but not in the static tests with M. bahia. Statistically significant acute toxicity and a greater than 20% increase in mortality over the reference sediment was found in the static renewal tests with A. abdita. Statistically significant mortality 10% over reference sediment was observed in the M. bahia static tests. 5 refs., 2 figs., 2 tabs.

  5. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    Science.gov (United States)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  6. Information Update Research Fellowship for International Young Scientists NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Danish National Research Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects with DFG News in Brief: NSFC set up Department of Medical Sciences NSFC Announced Approved Cooperative Projects With France and Germany NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Academy of Finland NSFC Announced Application Guide for Cooperative Research Projects with K. T. Li Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research projects With Japan Science and Technology Agency NSFC Announced Application Guide for Cooperative Research Projects With Royal Society of Edinburgh for 2010 NSFC Announced a List of proved Cooperative Projects With Three International Organizations

    Science.gov (United States)

    2009-01-01

    Research Fellowship for International Young Scientists NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Danish National Research Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects with DFG News in Brief: NSFC set up Department of Medical Sciences NSFC Announced Approved Cooperative Projects With France and Germany NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Academy of Finland NSFC Announced Application Guide for Cooperative Research Projects with K. T. Li Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research projects With Japan Science and Technology Agency NSFC Announced Application Guide for Cooperative Research Projects With Royal Society of Edinburgh for 2010 NSFC Announced a List of proved Cooperative Projects With Three International Organizations

  7. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  8. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  9. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  10. Evaluation of dredged material proposed for ocean disposal from Bronx River Project Area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Gruendell, B.D.; Gardiner, W.W.; Antrim, L.D.; Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle Marine Research Lab., Sequim, WA (United States)

    1996-12-01

    The objective of the Bronx River project was to evaluate proposed dredged material from the Bronx River project area in Bronx, New York, to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Bronx River was one of five waterways that the US Army Corps of Engineers-New York District (USAGE-NYD) requested the Battelle Marine Sciences Laboratory (MSL) to sample and to evaluate for dredging and disposal. Sediment samples were submitted for physical and chemical analyses, chemical analyses of dredging site water and elutriate, benthic and water-column acute toxicity tests, and bioaccumulation studies. Fifteen individual sediment core samples collected from the Bronx River project area were analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample, representing the entire reach of the area proposed for dredging, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4- dichlorobenzene. Dredging site water and elutriate water, which was prepared from the suspended-particulate phase (SPP) of the Bronx River sediment composite, were analyzed for metals, pesticides, and PCBS.

  11. Evaluation of dredged material proposed for ocean Disposal from Shoal Harbor/Compton Creek Project Area

    Energy Technology Data Exchange (ETDEWEB)

    Gardiner, W.W.; Borde, A.B.; Nieukirk, S.L.; Barrows, E.S.; Gruendell, B.D.; Word, J.Q.

    1996-10-01

    The objective of the Shoal Harbor/Compton Creek Project was to evaluate proposed dredged material from the Shoal harbor/Compton Creek Project Area in Belford and Monmouth, New Jersey to determine its suitability for unconfined ocean disposal at the Mud Dump Site. This was one of five waterways that the US Army Corps of Engineers- New York District requested the Battelle Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Shoal Harbor/Compton Creek Project area consisted of bulk chemical analyses, chemical analyses of dredging site water and elutriate, benthic and water-column acute toxicity tests and bioaccumulation studies. Eleven core samples were analyzed or grain size, moisture content, and total organic carbon. Other sediments were evaluated for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congers, polynuclear aromatic hydrocarbons, and 1,4- dichlorobenzene. Dredging site water and elutriate water were analyzed for metals, pesticides, and PCBs.

  12. 75 FR 22423 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-04-28

    ... Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project... of the Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Proposed Project Use Power Rate Adjustment. ] SUMMARY: The Bureau of Reclamation is reopening the comment period for the...

  13. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Area Power Administration Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE... statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center... Energy Resources (NextEra) applied to interconnect its proposed 150-megawatt (MW) Hyde County Wind Energy...

  14. Feasibility and potential effects of the proposed Amargosa Creek Recharge Project, Palmdale, California

    Science.gov (United States)

    Christensen, Allen H.; Siade, Adam J.; Martin, Peter; Langenheim, V.E.; Catchings, Rufus D.; Burgess, Matthew K.

    2015-09-17

    Historically, the city of Palmdale and vicinity have relied on groundwater as the primary source of water, owing, in large part, to the scarcity of surface water in the region. Despite recent importing of surface water, groundwater withdrawal for municipal, industrial, and agricultural use has resulted in groundwater-level declines near the city of Palmdale in excess of 200 feet since the early 1900s. To meet the growing water demand in the area, the city of Palmdale has proposed the Amargosa Creek Recharge Project (ACRP), which has a footprint of about 150 acres along the Amargosa Creek 2 miles west of Palmdale, California. The objective of this study was to evaluate the long-term feasibility of recharging the Antelope Valley aquifer system by using infiltration of imported surface water from the California State Water Project in percolation basins at the ACRP.

  15. The CERN disposal of the FELIX project proposal: some comments on and justification for it.

    Science.gov (United States)

    Bhattacharyya, S.; Roy, D.

    1998-12-01

    The authors seriously questioned and still continue to question the overemphasised "prospects" in the past of the so-called FELIX project in the domain of ultrahigh-energy astroparticle physics and the optimism that was nurtured around it. This was and is somewhat irrational because there is so far no dearth in the accumulated data for the testing of the models for particle production. But that up to now we failed to build up a really and concretely standard theory of particle production is due to our poverty in outlook and philosophy. The authors picked up and pointed out the very basic down-to-earth observables which even in the available energy range would really suffice to judge the merits and successes of any of the models. That the spirit of FELIX-like proposals might resurrect with just some other name even after the present (and temporary?) setback of the FELIX project remains the point of concern to the authors.

  16. Observation of seismicity based on DOMERAPI and BMKG seismic networks: A preliminary result from DOMERAPI project

    Science.gov (United States)

    Ramdhan, Mohamad; Nugraha, Andri Dian; Widiyantoro, Sri; Kristyawan, Said; Sembiring, Andry Syaly; Mtaxian, Jean-Philippe

    2016-05-01

    DOMERAPI project has involved earth scientists from Indonesia and France to conduct comprehensively a study of the internal structure of Mt. Merapi and its vicinity based on seismic tomographic imaging. The DOMERAPI seismic network was running from October 2013 to April 2015 consisting of 53 broad-band seismometers, covering Mt. Merapi and Mt. Merbabu, and some geological features such as Opak and Dengkeng faults. Earthquake hypocenter determination conducted in this study is an important step before seismic tomographic imaging. The earthquake events were identified and picked manually and carefully. The majority of earthquakes occured outside the DOMERAPI network. The ray paths of seismic waves from these earthquakes passed through the deep part of the study area around Merapi. The joint data of BMKG and DOMERAPI networks can minimize the azimuthal gap, which is often used to obtain an indication of the reliability of the epicentral solution. Our preliminary results show 279 events from October 2013 to mid August 2014. For future work, we will incorporate the BPPTKG (Center for Research and Technology Development of Geological Disaster) data catalogue in order to enrich seismic ray paths. The combined data catalogues will provide information as input for further advanced studies and volcano hazards mitigation.

  17. Evaluation of dredged material proposed for ocean disposal from Shark River Project area

    Energy Technology Data Exchange (ETDEWEB)

    Antrim, L.D.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Shark River Project was to evaluate proposed dredged material to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Tests and analyses were conducted on the Shark River sediments. The evaluation of proposed dredged material consisted of bulk sediment chemical and physical analysis, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests, and bioaccumulation tests. Individual sediment core samples collected from the Shark River were analyzed for grain size, moisture content, and total organic carbon (TOC). One sediment composite was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4- dichlorobenzene. Dredging site water and elutriate, prepared from suspended-particulate phase (SPP) of the Shark River sediment composite, were analyzed for metals, pesticides, and PCBs. Benthic acute toxicity tests and bioaccumulation tests were performed.

  18. An assessment strategy for proposals of engineering projects in the Bachelor of Biomedical Engineering Curriculum at Universidad Autónoma Metropolitana-Iztapalapa.

    Science.gov (United States)

    Castañeda-Villa, N; Jiménez-González, A; Ortiz-Posadas, M R

    2015-08-01

    Since 1974, the Bachelor of Biomedical Engineering Program (BBME) is offered at Universidad Autónoma Metropolitana-Iztapalapa, in Mexico City. By design, it must be completed in four years (12 trimesters) and, in the latter three, the senior students work on a BME project, which is done by completing three modules: Project Seminar (PS), Project on BME I and Project on BME II. In the PS module, the student must find a problem of interest in the BME field and suggest a solution through the development of an Engineering Project Proposal (EPP). Currently, the module is being taught by two faculty members of the BBME, who instruct students on how to develop their EPPs and evaluate their progress by reviewing a number of EPPs during the trimester. This generates a huge workload for the module instructors, which makes it necessary to involve more faculty members trimester-to-trimester (i.e. every 12 weeks) and, therefore, to create a set of systematic guidelines that ease the evaluation process for new instructors. Hence, the purpose of this paper is to present an assessment strategy (in the form of an assessment matrix) for the PS module as well as some preliminary results after two trimesters of its implementation.

  19. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  20. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  1. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  2. Preliminary proposal of a Nb{sub 3}Sn quadrupole model for the low {beta} insertions of the LHC

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, G.; Ametrano, F.; Bellomo, G.; Broggi, F.; Rossi, L.; Volpini, G. [Milan Univ. (Italy). Dip. di Fisica]|[INFN, Sezione di Milano (Italy). Laboratorio Acceleratori e Superconduttivita` Applicata

    1995-09-01

    In recent years Nb{sub 3}Sn based conductors have shown wide applicability for superconducting magnets in many research areas like high field solenoids for laboratory experiment, for NMR spectroscopy and high field magnets for fusion. Nb{sub 3}Sn technology is progressing fast, increasing both technical reliability and availability. The Nb{sub 3}Sn technology, which has a higher critical field than NbTi, seems attractive for IR (Insertion Region) quadrupoles of large colliders . In this paper it is proposed the construction of a superconducting quadrupole wound with Nb{sub 3}Sn cable for a second generation IR inner triplet low {beta} quadrupoles, for the Large Hadron Collider at CERN. The low {beta} quadrupoles, control the beam focusing at collision points, therefore a gain in term of focus strength and/or coil aperture can increase significantly machine performance. Two are the main steps for the whole project: (1) design and construction of a 1 metre long quadrupole to demonstrate the actual feasibility, which is the subject of this proposal; (2) study for integration of the quadrupole in the machine and final design of 5 m long quadrupoles finalized to the LHC.

  3. Critical evaluation of project manager's competency standard for proposing a comprehensive model

    OpenAIRE

    Ghasem Omidvar; ZULKIFLEE BIN ABDUL SAMAD; SOMAYE FATTAHI ZAFARGHANDI

    2011-01-01

    Identifying and developing project manager’s competency is becoming more and more important in a today competitive market. This importance also has absorbed the attention of main project management institutions such as Project Management Institute (PMI), Association for Project Management (APM), International Project Management Association (IPMA), and Australian institute of Project management (AIPM). These project management organizations in order to address the importance of project manager...

  4. Estimating landslide losses - preliminary results of a seven-State pilot project

    Science.gov (United States)

    Highland, Lynn M.

    2006-01-01

    reliable information on economic losses associated with landslides. Each State survey examined the availability, distribution, and inherent uncertainties of economic loss data in their study areas. Their results provide the basis for identifying the most fruitful methods of collecting landslide loss data nationally, using methods that are consistent and provide common goals. These results can enhance and establish the future directions of scientific investigation priorities by convincingly documenting landslide risks and consequences that are universal throughout the 50 States. This report is organized as follows: A general summary of the pilot project history, goals, and preliminary conclusions from the Lincoln, Neb. workshop are presented first. Internet links are then provided for each State report, which appear on the internet in PDF format and which have been placed at the end of this open-file report. A reference section follows the reports, and, lastly, an Appendix of categories of landslide loss and sources of loss information is included for the reader's information. Please note: The Oregon Geological Survey has also submitted a preliminary report on indirect loss estimation methodology, which is also linked with the others. Each State report is unique and presented in the form in which it was submitted, having been independently peer reviewed by each respective State survey. As such, no universal 'style' or format has been adopted as there have been no decisions on which inventory methods will be recommended to the 50 states, as of this writing. The reports are presented here as information for decision makers, and for the record; although several reports provide recommendations on inventory methods that could be adopted nationwide, currently no decisions have been made on adopting a uniform methodology for the States.

  5. Next Generation UAV Based Spectral Systems for Environmental Monitoring: project developments, preliminary outcome and findings

    Science.gov (United States)

    Campbell, P. K. E.; Townsend, P. A.; Mandl, D.; Ly, V. T.; Kingdon, C.; Sohlberg, R. A.; Corp, L. A.; Ong, L.; Nagol, J. R.

    2015-12-01

    This investigation contributes for bridging the gap in Earth observation between field and airborne measurements. We will reduce the risk of operating science grade instruments from Unmanned Aerial Systems (UAS), by developing robust methods to make well-characterized spectral measurements for integration, calibration and validation with NASAs science quality satellite and airborne data. Because of the potential for rapid deployment, spatially explicit data from UASs can be acquired irrespective of many of the cost, scheduling and logistic limitations to satellite or piloted aircraft missions. Provided that the measurements are suitably calibrated and well characterized, this opens up opportunities for calibration/validation activities not currently available. There is considerable interest in UASs from the agricultural and forestry industries but there is a need to identify a workflow that yields calibrated comparisons through space and time. The goal of our effort is to ensure that optical high spectral resolution measurements from UAV's are collected and processed in a fashion that allows ready integration with or comparison to NASA satellite and airborne data and derived products. We target the consistent retrieval of calibrated surface reflectance, as well as biological parameters including nutrient and chlorophyll content, chlorophyll fluorescence and photosynthetic capacity. We will test our technology and protocols first using spatially-resolved discrete point measurements characterizing canopy VNIR reflectance and solar-induced fluorescence, followed by imaging spectroscopy. A Rapid Data Assimilation and delivery system will be developed, based on SensorWeb Intelligent Payload Module for high speed onboard processing. The deployment of UAS sensors at sites such as flux towers will facilitate measrurement validation and parameter retrieval, than is possible by foot, from sensors fixed to a tower, or irregular aircraft missions. We will report preliminary

  6. New shipyard layout design for the preliminary phase & case study for the green field project

    Directory of Open Access Journals (Sweden)

    Young Joo Song

    2013-03-01

    Full Text Available For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

  7. How an impact plan can build on the success of your project - from proposal to legacy

    Science.gov (United States)

    Alexiou, Sofia; Grigorov, Ivo; Ashton, Eleanor; Bayliss-Brown, Georgia; NiCheallachain, Cliona

    2016-04-01

    Research Impact is often defined as the 'demonstrable contribution that excellent research makes to society and the economy'. Impact is important as it demonstrates the value of funding agencies' investment into science. Measuring impact is an essential of project management, from proposal phase to output. However, impact can mean a range of things to different people and organisations. When applying for funding, it is critical to check and understand the type of impact recognised by the relevant funder and to consider opportunities for building in multiple benefits. In 2015, it was observed that the drive to 'get stricter on impact' had a direct effect on the evaluators' instructions and subsequent proposal ratings. As funding agencies are reshaping assessment processes and implementing new indicators of impact and new innovation actions, it is clear that a need to demonstrate performance, impact and added-value must be included within the proposal phase. Within this EOS21 Session we address common questions on: • What do the funders want and where are they going? • How do these new indicators affect the Research Evaluation Framework (REF)? • How is 'societal impact' of research measured? • How do I write an impact plan?

  8. 75 FR 2138 - Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming (DOE/EIS-0438)

    Science.gov (United States)

    2010-01-14

    ... 13175, Consultation and Coordination with Indian Tribal Governments (65 FR 67249), the President's... FR 22951), DOE-specific guidance on tribal interactions, and applicable natural and cultural... Area Power Administration Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming...

  9. Earnings sharing in Social Security: projected impacts of alternative proposals using the MINT model.

    Science.gov (United States)

    Iams, Howard M; Reznik, Gayle L; Tamborini, Christopher R

    2009-01-01

    Changes in American family and work patterns over the past decades have prompted various policy proposals for changing the structure of Social Security benefits. In this article, we use the Social Security Administration's Modeling Income in the Near Term (MINT) microsimulation model to project how Social Security benefit amounts would change in response to incorporating earnings sharing into benefit calculations for the population aged 62 or older in 2030 under three hypothetical policy scenarios. The earnings sharing scenarios modeled in the article would reduce benefits for the majority of individuals, although there are important differences among married, divorced, and widowed individuals. Some groups of men and women would experience increases in Social Security benefits, while some would receive reduced benefits in comparison to current law, particularly widowed individuals. Allowing widows to inherit the earnings records of their deceased husbands would improve their outcomes.

  10. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  11. Protecting Place Through Community Alliances: Haida Gwaii Responds to the Proposed Enbridge Northern Gateway Project

    Science.gov (United States)

    Crist, Valine

    This research contributes to the emerging dialogue concerning power relationships and the alliances that are challenging current frameworks in an attempt to create positive change. Worldwide, local people in rural places are threatened by development paradigms and conflicting social, political, economic, and ecological values. Large-scale development, such as the Enbridge Northern Gateway Project (NGP), provide a tangible example of our failing systems and make the interplay of these elements palpable. Increasingly, communities are coalescing to challenge the current models and economically motivated agendas threatening Indigenous sovereignty and local lifeways. Central to these coalitions are Indigenous peoples who are aligning with non-Indigenous neighbours to renegotiate power relationships. This research examines these dynamic alliances and uses Haida Gwaii's resistance to the NGP as an example of the formidable strength of community coalitions mobilized by intersecting values. To contextualize the NGP within the broader discourse, I problematize Canada's environmental assessment process and consider how media portrays the growing resistance to the proposed project. Drawing on information presented through the environmental assessment, I analyze the main messages and shared values of Haida Gwaii citizens opposed to the NGP. This thesis focuses on this unanimous and galvanizing resistance, which is largely motivated by the reliance on local food sources and an embodied connection to Haida Gwaii shared by Island citizens. The continued denial of Aboriginal title and rights was inherent throughout this consideration and is an underlying theme throughout the analyses.

  12. 77 FR 59609 - FPP Project 111, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-09-28

    ...) of the Federal Power Act (FPA), proposing to study the feasibility of the Lorella Pumped Storage Hydroelectric Project to be located near the town of Klamath Falls, Klamath County, Oregon. The project would... storage capacity of 14,300 acre-feet at a water surface area of 5,523 feet above mean sea level (msl); (2...

  13. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties, CA, Corps Permit Application... of Intent. ] SUMMARY: Delta Wetland Properties (Applicant) has applied for a Department of Army... Environmental Impact Statement (EIS) for the Delta Wetlands Project (prepared in 2001) is required. Delta...

  14. 75 FR 27854 - 30-Day Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in...

    Science.gov (United States)

    2010-05-18

    ... Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in Support of... Major Weapons in Support of Section 25(a)(1) of the Arms Export Control Act. OMB Control Number: 1405... annual report to Congress on projected sales of major weapons and weapons-related defense equipment (if...

  15. 77 FR 9214 - Notice of Proposed Waiver and Extension of Project Period for the Native Hawaiian Career and...

    Science.gov (United States)

    2012-02-16

    ... Notice of Proposed Waiver and Extension of Project Period for the Native Hawaiian Career and Technical...: Notice. SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career... community- based organization means a public or private organization that provides career and...

  16. 75 FR 44231 - Notice of Proposed Extension of Project Period and Waiver for the State and Federal Policy Forum...

    Science.gov (United States)

    2010-07-28

    ... Notice of Proposed Extension of Project Period and Waiver for the State and Federal Policy Forum for... extension of project period and waiver for the State and Federal Policy Forum for Program Improvement Center... enable the currently funded State and Federal Policy Forum for Program Improvement Center to receive...

  17. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  18. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  19. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... Proposals should be mailed or e-mailed to: Mr. Steven Porter, Assistant General Counsel for Electricity....porter@hq.doe.gov . An additional copy of any Project Proposal involving Southwestern should be mailed or... Porter, Assistant General Counsel for Electricity & Fossil Energy, Department of Energy, 1000...

  20. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... (Montlake Triangle Project) Sound Transit North Link Light Rail, Sound Transit, Seattle, WA; (10) North... (Montlake Triangle Project) Sound Transit North Link Light Rail, Seattle, WA. Project sponsor: Sound Transit... Exposition Light Rail Transit Project, Los Angeles County Metropolitan Transportation Authority, Los...

  1. SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

    Energy Technology Data Exchange (ETDEWEB)

    RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

    2010-10-22

    This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics

  2. A First Preliminary Look: Are Corridor Charging Stations Used to Extend the Range of Electric Vehicles in The EV Project?

    Energy Technology Data Exchange (ETDEWEB)

    John Smart

    2013-01-01

    A preliminary analysis of data from The EV Project was performed to begin answering the question: are corridor charging stations used to extend the range of electric vehicles? Data analyzed were collected from Blink brand electric vehicle supply equipment (EVSE) units based in California, Washington, and Oregon. Analysis was performed on data logged between October 1, 2012 and January 1, 2013. It should be noted that as additional AC Level 2 EVSE and DC fast chargers are deployed, and as drivers become more familiar with the use of public charging infrastructure, future analysis may have dissimilar conclusions.

  3. 77 FR 2289 - FFP Project 33, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 33, LLC and Northland Power Mississippi River LLC; Notice... filed by FFP Project 33, LLC for Project No. 12924- 002, and Northland Power Mississippi River LLC...

  4. 77 FR 2290 - FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice..., in St. James Parish, Louisiana. The applications were filed by FFP Project 18, LLC for Project...

  5. 77 FR 2288 - FFP Project 7, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 7, LLC and Northland Power Mississippi River LLC; Notice... by FFP Project 7, LLC for Project No. 12851-002, and Northland Power Mississippi River LLC...

  6. 77 FR 2287 - FFP Project 40, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 40, LLC and Northland Power Mississippi River LLC; Notice... applications were filed by FFP Project 40, LLC for Project No. 12929-002, and Northland Power Mississippi...

  7. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... notice are: 1. Project name and location: Central Bus Operations and Maintenance Facility, Salt Lake City... environmental actions taken by the Federal Transit Administration (FTA) for projects in the following locations... the environmental decisions by FTA on the subject projects and to activate the limitation on any...

  8. 75 FR 58017 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-09-23

    ... of Harris County, Texas, University Corridor Fixed Guideway Transit Project, Houston, TX; (6... Authority, Easton Intermodal Transportation Center, Easton, PA. The purpose of this notice is to announce... Authority of Harris County, Texas. Project description: The project is an 11.36 mile light rail...

  9. Project for Minorities and Women in Research: Status Report, 1979 and Proposed Activities, 1980.

    Science.gov (United States)

    Escobedo, Theresa Herrera; Acevedo, Baltazar

    An experimental project at the University of Texas at Austin, which was designed to increase the participation of minorities and women in educational research and related work, is described. The project brings together individuals who are at the post-doctoral and pre-doctoral level to cooperatively work on research questions. The project model…

  10. Optimisation of small-scale hydropower using quality assurance methods - Preliminary project; Vorprojekt: Optimierung von Kleinwasserkraftwerken durch Qualitaetssicherung. Programm Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Hofer, S.; Staubli, T.

    2006-11-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary project that examined how quality assurance methods can be used in the optimisation of small-scale hydropower projects. The aim of the project, to use existing know-how, experience and synergies, is examined. Discrepancies in quality and their effects on production prices were determined in interviews. The paper describes best-practice guidelines for the quality assurance of small-scale hydro schemes. A flow chart describes the various steps that have to be taken in the project and realisation work. Information collected from planners and from interviews made with them are presented along with further information obtained from literature. The results of interviews concerning planning work, putting to tender and the construction stages of these hydro schemes are presented and commented on. Similarly, the operational phase of such power plant is also examined, including questions on operation and guarantees. The aims of the follow-up main project - the definition of a tool and guidelines for ensuring quality - are briefly reviewed.

  11. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    Science.gov (United States)

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  12. Direct Observation of Rhyolite Magma by Drilling: The Proposed Krafla Magma Drilling Project

    Science.gov (United States)

    Eichelberger, J. C.; Sigmundsson, F.; Papale, P.; Markusson, S.; Loughlin, S.

    2014-12-01

    Remarkably, drilling in Landsvirkjun Co.'s geothermal field in Krafla Caldera, Iceland has encountered rhyolite magma or hypersolidus rhyolite at 2.1-2.5 km depth in 3 wells distributed over 3.5 km2, including Iceland Deep Drilling Program's IDDP-1 (Mortensen, 2012). Krafla's most recent rifting and eruption (basalt) episode was 1975-1984; deformation since that time has been simple decay. Apparently rhyolite magma was either emplaced during that episode without itself erupting or quietly evolved in situ within 2-3 decades. Analysis of drill cuttings containing quenched melt from IDDP-1 yielded unprecedented petrologic data (Zierenberg et al, 2012). But interpreting active processes of heat and mass transfer requires knowing spatial variations in physical and chemical characteristics at the margin of the magma body, and that requires retrieving core - a not-inconceivable task. Core quenched in situ in melt up to 1150oC was recovered from Kilauea Iki lava lake, Hawaii by the Magma Energy Project >30 years ago. The site from which IDDP-1 was drilled, and perhaps IDDP-1 itself, may be available to attempt the first-ever coring of rhyolite magma, now proposed as the Krafla Magma Drilling Project (KMDP). KMDP would also include geophysical and geochemical experiments to measure the response of the magma/hydrothermal system to fluid injection and flow tests. Fundamental results will reveal the behavior of magma in the upper crust and coupling between magma and the hydrothermal system. Extreme, sustained thermal power output during flow tests of IDDP-1 suggests operation of a Kilauea-Iki-like freeze-fracture-flow boundary propagating into the magma and mining its latent heat of crystallization (Carrigan et al, EGU, 2014). Such an ultra-hot Enhanced Geothermal System (EGS) might be developable beneath this and other magma-heated conventional hydrothermal systems. Additionally, intra-caldera intrusions like Krafla's are believed to produce the unrest that is so troubling in

  13. Preliminary volcanic hazards evaluation for Los Alamos National Laboratory Facilities and Operations : current state of knowledge and proposed path forward

    Energy Technology Data Exchange (ETDEWEB)

    Keating, Gordon N.; Schultz-Fellenz, Emily S.; Miller, Elizabeth D.

    2010-09-01

    The integration of available information on the volcanic history of the region surrounding Los Alamos National Laboratory indicates that the Laboratory is at risk from volcanic hazards. Volcanism in the vicinity of the Laboratory is unlikely within the lifetime of the facility (ca. 50–100 years) but cannot be ruled out. This evaluation provides a preliminary estimate of recurrence rates for volcanic activity. If further assessment of the hazard is deemed beneficial to reduce risk uncertainty, the next step would be to convene a formal probabilistic volcanic hazards assessment.

  14. Review of the independent risk assessment of the proposed Cabrillo liquified natural gas deepwater port project.

    Energy Technology Data Exchange (ETDEWEB)

    Gritzo, Louis Alan; Hightower, Marion Michael; Covan, John Morgan; Luketa-Hanlin, Anay Josephine

    2006-01-01

    In March 2005, the United States Coast Guard requested that Sandia National Laboratories provide a technical review and evaluation of the appropriateness and completeness of models, assumptions, analyses, and risk management options presented in the Cabrillo Port LNG Deepwater Port Independent Risk Assessment-Revision 1 (Cabrillo Port IRA). The goal of Sandia's technical evaluation of the Cabrillo Port IRA was to assist the Coast Guard in ensuring that the hazards to the public and property from a potential LNG spill during transfer, storage, and regasification operations were appropriately evaluated and estimated. Sandia was asked to review and evaluate the Cabrillo Port IRA results relative to the risk and safety analysis framework developed in the recent Sandia report, ''Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill over Water''. That report provides a framework for assessing hazards and identifying approaches to minimize the consequences to people and property from an LNG spill over water. This report summarizes the results of the Sandia review of the Cabrillo Port IRA and supporting analyses. Based on our initial review, additional threat and hazard analyses, consequence modeling, and process safety considerations were suggested. The additional analyses recommended were conducted by the Cabrillo Port IRA authors in cooperation with Sandia and a technical review panel composed of representatives from the Coast Guard and the California State Lands Commission. The results from the additional analyses improved the understanding and confidence in the potential hazards and consequences to people and property from the proposed Cabrillo Port LNG Deepwater Port Project. The results of the Sandia review, the additional analyses and evaluations conducted, and the resolutions of suggested changes for inclusion in a final Cabrillo Port IRA are summarized in this report.

  15. A précis of recent advances in the neuropsychology of mild cognitive impairment(s) in Parkinson's disease and a proposal of preliminary research criteria.

    Science.gov (United States)

    Tröster, Alexander I

    2011-05-01

    Cognitive changes of Parkinson's disease (PD) manifest earlier and are more heterogeneous than previously appreciated. Approximately one-third of patients have at least mild cognitive changes at PD diagnosis, and subtle changes might be appreciable among those at risk for PD. Executive dysfunction is the most common cognitive change, but other phenotypes exist. Pathobiologic and potential prognostic differences among cognitive phenotypes remain poorly understood. Progress in the neuropsychology, epidemiology and pathobiology of mild cognitive impairment (MCI) in PD is hampered by lack of diagnostic criteria. This study proposes preliminary research criteria for two categories of PD non-dementia cognitive impairment.

  16. White Paper on Data Repository Reorganization Proposal for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B [ORNL; Williams, Paul T [ORNL; Bass, Bennett Richard [ORNL

    2012-09-01

    As the xLPR project moves along, it is important to properly manage the knowledge generated by the different groups. We focus specifically on the knowledge and communications written in files, including general documents, source code and executable files. Data generated through the project are different in nature and, for this reason, need to be treated differently. To that end, ORNL put in place a series of tools that facilitate proper storage and management of project data, document and code changes, group collaboration, knowledge transfer, transparency, accountability and auditability. This paper describes the approaches/tools that we recommend for moving the project forward on knowledge management.

  17. Preliminary Water Assessment Reports of The Test Basins of The Watch Project

    NARCIS (Netherlands)

    Ludwig, F.; Candel, M.; Carrera, J.; Fendekova, M.; Haddeland, I.; Horacek, S.; Jodar, J.; Koutroulis, A.; Navorro, V.; Tsanis, I.

    2008-01-01

    This report presents the initial plans of the case studies how they link to rest of the Watch project and on which water resources they will focus. This report will function as the basis for further discussions on how to improve the integration of the case studies within the project and to develop a

  18. Instruments for competing claims on natural resources : preliminary assessment of KB 2011 projects

    NARCIS (Netherlands)

    Silvis, H.J.; Bodegom, van A.J.

    2011-01-01

    This report results from the project ‘Competing Claims on Natural Resources (overkoepelend instrumentarium)’ in the KB programme of 2011. In short the terms of reference of this report are as follows: Give an overview of instruments developed in other KB projects relevant for the analysis of Competi

  19. The CERI INSET Project: A Description and a Preliminary Evaluation of International Co-development Work.

    Science.gov (United States)

    Henderson, Euan S.

    1982-01-01

    Between 1975 and 1980, the Organization for European Cooperation and Development's Centre for Educational Research and Innovation engaged in a project to enable member countries to share innovative approaches to inservice teacher education. Several aspects of the inservice education for teachers (INSET) project are discussed. (CJ)

  20. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, Brian A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Becker, Bryan R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  1. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  2. Design and Preliminary Evaluation of the r-Gamma Display Concept Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposed Phase I SBIR effort is to develop and assess the feasibility of an innovative new flight instrument proposed to replace the...

  3. Assessment of wind turbine wake-effects in the proposed "Markerwaard" wind/hydro project

    NARCIS (Netherlands)

    Vermeulen, P.E.J.; Builtjes, P.J.H.; Vijge, J.B.A.; Smet, L. de

    1980-01-01

    Figure I gives on overview of the location of the "Markerwaard" area within the "IJsselmeer" lake in the middle of the Netherlands. This area is the last part of the large reclamation project in the "IJsselmeer" lake. This project has resulted thus far in the realisation of four polders of roughly 4

  4. 76 FR 16609 - Proposed Information Collection; Comment Request; Identification of Human Cell Lines Project

    Science.gov (United States)

    2011-03-24

    ...; Identification of Human Cell Lines Project AGENCY: National Institute of Standards and Technology (NIST...) profiling up to 1500 human cell line samples as part of the Identification of Human Cell Lines Project. All... for Biotechnology Information (NCBI) and will be used to differentiate among cell lines, as...

  5. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  6. 76 FR 48846 - FFP Project 125 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-08-09

    ... transmission line would interconnect with the power grid. The proposed project would have an average annual...: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114; phone (978) 283.../docs-filing/ecomment.asp . You must include your name and contact information at the end of...

  7. 76 FR 48849 - FFP Project 46 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-08-09

    ...; and (4) a transmission line would interconnect with the power grid. The proposed project would have an.... Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114...://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the...

  8. 76 FR 48852 - FFP Project 42 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-08-09

    ...; and (4) a transmission line would interconnect with the power grid. The proposed project would have an.... Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 239 Causeway Street, Boston, MA 02114...://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the...

  9. 77 FR 31037 - Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in...

    Science.gov (United States)

    2012-05-24

    .... LVRWA09A2370; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy... laws, for a period of up to 2 years. This is for the purpose of processing one solar energy right-of... Valley Solar Energy Project in Maricopa County, Arizona. DATES: Effective Date: This segregation...

  10. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322...

  11. Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

    Directory of Open Access Journals (Sweden)

    Cristofer André Caous

    2012-06-01

    Full Text Available Objective: To propose a measure (index of expected risks to evaluateand follow up the performance analysis of research projects involvingfinancial and adequate structure parameters for its development.Methods: A ranking of acceptable results regarding researchprojects with complex variables was used as an index to gauge aproject performance. In order to implement this method the ulcerindex as the basic model to accommodate the following variableswas applied: costs, high impact publication, fund raising, and patentregistry. The proposed structured analysis, named here as RoSI(Return on Scientific Investment comprises a pipeline of analysis tocharacterize the risk based on a modeling tool that comprises multiplevariables interacting in semi-quantitatively environments. Results:This method was tested with data from three different projects in ourInstitution (projects A, B and C. Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C related to development and expected results according to initial or full investment. Conclusion: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  12. Drift design methodology and preliminary application for the Yucca Mountain Site Characterization Project; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Hardy, M.P. [Agapito (J.F.T.) and Associates, Inc., Grand Junction, CO (United States); Bauer, S.J. [Sandia National Labs., Albuquerque, NM (United States)

    1991-12-01

    Excavation stability in an underground nuclear waste repository is required during construction, emplacement, retrieval (if required), and closure phases to ensure worker health and safety, and to prevent development of potential pathways for radionuclide migration in the post-closure period. Stable excavations are developed by appropriate excavation procedures, design of the room shape, design and installation of rock support reinforcement systems, and implementation of appropriate monitoring and maintenance programs. In addition to the loads imposed by the in situ stress field, the repository drifts will be impacted by thermal loads developed after waste emplacement and, periodically, by seismic loads from naturally occurring earthquakes and underground nuclear events. A priori evaluation of stability is required for design of the ground support system, to confirm that the thermal loads are reasonable, and to support the license application process. In this report, a design methodology for assessing drift stability is presented. This is based on site conditions, together with empirical and analytical methods. Analytical numerical methods are emphasized at this time because empirical data are unavailable for excavations in welded tuff either at elevated temperatures or under seismic loads. The analytical methodology incorporates analysis of rock masses that are systematically jointed, randomly jointed, and sparsely jointed. In situ thermal and seismic loads are considered. Methods of evaluating the analytical results and estimating ground support requirements for all the full range of expected ground conditions are outlines. The results of a preliminary application of the methodology using the limited available data are presented. 26 figs., 55 tabs.

  13. Assessment on The Islamic Banking Market Share Projection by Bank Indonesia and Proposed Methods

    Directory of Open Access Journals (Sweden)

    Raditya Sukmana

    2015-08-01

    Full Text Available Indonesian Islamic banking market share projected by Bank Indonesia is an integral part in developing the industry in the country. By setting a projection which will then be used as a benchmark / target, Islamic banks can make a necessary program to attract new customers which eventually increase its asset. If the increase of the asset is significant,the Islamic bank market share may increase. The problem is that the current projection by Bank Indonesia seems to be off target. It means that the projection is pretty much above the actual value. This paper attempts to utilize two projection methods namely Spline and Auto-ARIMA which we think can provide a better result. This study uses the monthly data covering period since January 2006 until December 2012. The result shows that our projections, especially using Spline method, are closer to the actual value of the Islamic banking industry market share. It means that the gap between the projection and the actual value of market share is lesser than the gap on the Bank Indonesia calculation. Moreover, this study argue that, the projection of the Islamic banking market share made by BI will not be achieved unless with government support. So far, government has not made any policy which deposit some of the national budget in the Islamic bank. This study calculates that if government regularly depositing 1% of total National Government Budget in Islamic banks, the projection of Islamic banking market share made by BI will be acheived. As a conclusion, the role of government is very significant in developing the Islamic banking industry in Indonesia.

  14. Frictional sliding in layered rock model: Preliminary experiments. Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Perry, K.E. Jr.; Buescher, B.J.; Anderson, D.; Epstein, J.S. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1995-09-01

    An important aspect of determining the suitability of Yucca Mountain as a possible nuclear waste repository requires understanding the mechanical behavior of jointed rock-masses. To this end we have studied the frictional sliding between simulated rock joints in the laboratory using the technique of phase shifting moire interferometry. The models were made from stacks of Lexan plates and contained a central hole to induce slip between the plates when the models were loaded in compression. These preliminary results confirm the feasibility of the approach and show a clear evolution of slip as function of load.

  15. Heat recovery and seed recovery development project: preliminary design report (PDR)

    Energy Technology Data Exchange (ETDEWEB)

    Arkett, A. H.; Alexander, K. C.; Bolek, A. D.; Blackman, B. K.; Kurrle, P. E.; Tram, S. V.; Warren, A. M.; Ziobrowski, A. J.

    1981-06-01

    The preliminary design and performance characteristics are described of the 20 MWt heat recovery and seed recovery (HRSR) system to be fabricated, installed, and evaluated to provide a technological basis for the design of commercial size HRSR systems for coal-fired open-cycle MHD power plants. The system description and heat and material balances, equipment description and functional requirements, controls, interfacing systems, and operation and maintenance are detailed. Appendices include: (1) recommended environmental requirements for compliance with federal and state of Tennessee regulations, (2) channel and diffuser simulator, (3) equipment arrangement drawings, and (4) channel and diffuser simulator barrel drawings. (WHK)

  16. A Preliminary Study of the Audit of Post Project Appraisal%试论审计项目后评估

    Institute of Scientific and Technical Information of China (English)

    何静

    2012-01-01

    从审计项目后评估出发,结合审计绩效管理,对审计项目后评估的意义及重点进行分析,提出审计项目后评估的系统设想,以期更好地提高审计项目管理工作科学化和规范化水平。%From the audit of post project appraisal, combining the audit performance management, the paper analyzes the meaning and key points of the audit of post project appraisal, proposing a system for the audit of post project appraisal, in order to better improve levels of the scientization of the auditing project management and regulation.

  17. 78 FR 43870 - Hydrogen Energy California's Integrated Gasification Combined Cycle Project; Preliminary Staff...

    Science.gov (United States)

    2013-07-22

    ... petroleum coke (petcoke) into a synthesis gas (syngas). The facility would gasify the fuel blend to produce... referred to as a poly-generation (or polygen) plant. The project could generate urea, ammonia, and...

  18. Instruments for competing claims on natural resources : preliminary assessment of KB 2011 projects

    OpenAIRE

    2011-01-01

    This report results from the project ‘Competing Claims on Natural Resources (overkoepelend instrumentarium)’ in the KB programme of 2011. In short the terms of reference of this report are as follows: Give an overview of instruments developed in other KB projects relevant for the analysis of Competing Claims on Natural Resources. Questions include: What are feasible instruments? What are their advantages and disadvantages? What can or should be applied in specific cases? Is there a need to va...

  19. 75 FR 39561 - Administrative Guidelines; Subsidy Layering Reviews for Proposed Section 8 Project-Based Voucher...

    Science.gov (United States)

    2010-07-09

    ... of 1992 (Pub. L. 102-550, approved October 28, 1992) (HCDA), allows State HCAs to perform subsidy... receiving Section 8 project-based vouchers. While Section 911 of the HCDA is a discretionary provision...

  20. Preliminary publications book 2 from project on mineral resources, metallogenesis, and tectonics of northeast Asia

    Science.gov (United States)

    Nokleberg, Warren J.; Miller, Robert J.; Naumova, Vera V.; Khanchuk, Alexander I.; Parfenov, Leonid M.; Kuzmin, Mikhail I.; Bounaeva, Tatiana M.; Obolenskiy, Alexander A.; Rodionov, Sergey M.; Seminskiy, Zhan V.; Diggles, Michael F.

    2003-01-01

    This is the Web version of a CD-ROM publication. This report consists of summary major compilations and syntheses accomplished in the six-year project through April 2003 for the study on the Mineral Resources, Metallogenesis, and Tectonics of Northeast Asia (Eastern and Southern Siberia, Mongolia, Northeastern China, South Korea, and Japan). The major scientific goals and benefits of the project are to: (1) provide a comprehensive international data base on the mineral resources of the region that is the first, extensive knowledge available in English; (2) provide major new interpretations of the origin and crustal evolution of mineralizing systems and their host rocks, thereby enabling enhanced, broad-scale tectonic reconstructions and interpretations; and (3) promote trade and scientific and technical exchanges between the North America and Northeast Asia. Data from the project are providing sound scientific data and interpretations for commercial firms, governmental agencies, universities, and individuals that are developing new ventures and studies in the project area, and for land-use planning studies that deal with both mineral potential issues. Northeast Asia has vast potential for known and undiscovered mineral deposits; however, little information existed in English in the West until publication of products from this project. Consequently, data and interpretations from the project are providing basic knowledge for major scientific, commercial, national, and international endeavors by other interested individuals and groups.

  1. A Proposal to Manage Lessons Learned in Projects: Web 2.0 Technologies to Promote Innovation

    OpenAIRE

    Marcirio Silveira Chaves.; Giuliana Santos Veronese

    2014-01-01

    The web 2.0 is transforming the project management in organizations by improving communication and collaboration. The new generation of web-based collaborative tools provides much better experience than the traditional software package allowing document sharing, integrated task tracking, enforcing team processes and agile planning. Despite of the indubitable benefits brought by web 2.0, the use of these technologies to promote knowledge management remains unexplored. For many project managers...

  2. Methodological Proposal for Teamwork Evaluation in the field of training Project Management.

    OpenAIRE

    Ríos Carmenado, Ignacio de los; Figueroa Rodriguez, Benjamin; Gómez Gajardo, Francisca

    2012-01-01

    Teamwork, is one of the abilities that today is highly valued in the professional arena with a great importance for various personal and interpersonal skills associated with it. In this context, the Technical University of Madrid, is developing a coordinated educational innovation project, which main objective is to develop methodological and assessment tools for the acquisition of personal skills necessary to improve the employability of graduates and their skills for project management. ...

  3. 76 FR 72187 - Intent To Prepare an Environmental Impact Statement for the Proposed Westbrook Project, Corps...

    Science.gov (United States)

    2011-11-22

    ..., wetland swales, and vernal pools. The proposed site for the Westbrook community is in unincorporated... areas within wetland swales). The Applicant reports that there are historic properties within...

  4. 77 FR 43577 - Intent To Prepare an Environmental Impact Statement for the Proposed Westbrook Project, Corps...

    Science.gov (United States)

    2012-07-25

    ... two intermittent streams, seasonal wetlands, wetland swales, and vernal pools. The proposed site for... (including depressional areas within wetland swales). The Applicant reports that there are...

  5. The National Educational Loan Bank: A Proposal for Improving the System of Lending for Higher Education. Working Paper, Preliminary Draft.

    Science.gov (United States)

    Deitch, Kenneth M.

    A National Education Loan Bank (NELB) is proposed as an alternative to existing federal loan programs for education, such as the National Direct Student Loan program and the Guaranteed Student Loan program. The history and structures of these two programs are detailed: financing, costs, insurance arrangements, agencies, volume, and interest rates.…

  6. Self-scrubbing coal{sup TM}: An integrated approach to clean air. A proposed Clean Coal Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This environmental assessment (EA) was prepared by the U.S.Department of Energy (DOE), with compliance with the National Environmental Policy Act (NEPA) of 1969, Council on Environmental Quality (CE) regulations for implementating NEPA (40 CFR 1500-1508) and DOE regulations for compliance with NEPA (10 CFR 1021), to evaluate the potential environmental impacts associated with a proposed demonstration project to be cost-shared by DOE and Custom Coals International (CCI) under the Clean Coal Technology (CCT) Demonstration Program of DOE`s Office of Fossil Energy. CCI is a Pennsylvania general partnership located in Pittsburgh, PA engaged in the commercialization of advanced coal cleaning technologies. The proposed federal action is for DOE to provide, through a cooperative agreement with CCI, cost-shared funding support for the land acquisition, design, construction and demonstration of an advanced coal cleaning technology project, {open_quotes}Self-Scrubbing Coal: An Integrated Approach to Clean Air.{close_quotes} The proposed demonstration project would take place on the site of the presently inactive Laurel Coal Preparation Plant in Shade Township, Somerset County, PA. A newly constructed, advanced design, coal preparation plant would replace the existing facility. The cleaned coal produced from this new facility would be fired in full-scale test burns at coal-fired electric utilities in Indiana, Ohio and PA as part of this project.

  7. A Learning Proposal Based on a Project and Collaborative Work: An Online Course Experience

    Directory of Open Access Journals (Sweden)

    Gabriela Cenich

    2005-11-01

    Full Text Available One of the basic necessities for education in the future is to prepare learners to participate in a computer network, since in the information society knowledge is the most critical resource for social and economic development. This paper addresses how project-based learning was designed and implemented in a course on computer science at the National University of Central Argentina. The objective of the course was to engage students in the production of projects that were authentic, meaningful, and intended for future teaching and professional use. Two types of interaction have been considered in computer-mediated learning: individual interaction (interaction with the content, and social or interpersonal interaction. This paper describes the course design, provides an overview of the processes involved in developing the project-based learning activities, and reports the responses of students to the course.

  8. Global energy network. ; Proposal of GENESIS project. Grobal energy network. ; GENESIS keikaku no teian

    Energy Technology Data Exchange (ETDEWEB)

    Kuwano, Y. (Sanyo Electric Co. Ltd., Osaka (Japan))

    1990-03-25

    This paper explains a global energy neywork in which solar cells producing electric power as the basic energy and superconducting cables are used. Photovoltatic power generating stations are dispersely equipped in many points on the earth and the network to connect all over the world is constructed by using superconducting cables to transmit energy from daytime area to nighttime area. The project to always use photovoltatic power is called the GENESIS. It is required to develop solar cells of much higher performance and lower cost and to develop high T {sub c} superconducting cables to realize this GENESIS project. Another important problem is to construct the global system. Since Japan depends 82% of the consuming energy on import and further, leads the world technically for the development of amorphous Si sollar cells, Japan should promote this project as the center of this system. 6 figs., 3 tabs.

  9. SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

    Energy Technology Data Exchange (ETDEWEB)

    RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

    2010-10-22

    This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics

  10. A Short-Term Evaluation of Project DARE (Drug Abuse Resistance Education): Preliminary Indications of Effectiveness.

    Science.gov (United States)

    DeJong, William

    1987-01-01

    Assessed impact of Project DARE (Drug Abuse Resistance Education) on knowledge, attitudes, and self-reported behavior of seventh graders who received DARE curriculum in sixth grade. Compared to controls, DARE students reported significantly lower use of alcohol, cigarettes, and other drugs. Findings were especially strong for boys. (Author/NB)

  11. Preliminary evaluation of a prototype welfare monitoring system for sows and piglets (Welfare Quality (R) project)

    NARCIS (Netherlands)

    Scott, K.; Binnendijk, G.P.; Edwards, S.A.; Gu, J.H.; Wijhe-Kiezebrink, van M.C.; Vermeer, H.M.

    2009-01-01

    The Welfare Quality(R) project aims to develop a European on-form welfare assessment standard for pigs, amongst other species. A prototype monitoring system was developed for sows and piglets using predominantly animal-based measures of behaviour, health and physiology to assess welfare. The

  12. 77 FR 2287 - FFP Project 17, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 17, LLC and Northland Power Mississippi River LLC; Notice..., near the town of North Vacherie, in St. James Parish, Louisiana. The applications were filed by...

  13. 77 FR 2289 - FFP Project 41, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 41, LLC, Northland Power Mississippi River LLC; Notice..., in Tunica County, Mississippi, and Lee County, Arkansas. The applications were filed by FFP...

  14. 77 FR 2288 - FFP Project 10, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 10, LLC, Northland Power Mississippi River LLC; Notice..., near the town of Avondale, in Jefferson Parish, Louisiana. The applications were filed by FFP...

  15. 77 FR 2287 - FFP Project 32, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 32, LLC and Northland Power Mississippi River LLC; Notice..., in Tensas Parish, Louisiana, and Jefferson County Mississippi. The applications were filed by...

  16. 77 FR 2288 - FFP Project 21, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 21, LLC and Northland Power Mississippi River LLC; Notice..., near the town of Donaldsonville, in Ascension Parish, Louisiana. The applications were filed by...

  17. 77 FR 2287 - FFP Project 6, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 6, LLC and Northland Power Mississippi River LLC; Notice..., near the town of New Orleans, in Orleans Parish, Louisiana. The applications were filed by FFP...

  18. 77 FR 2289 - FFP Project 39, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 39, LLC and Northland Power Mississippi River LLC; Notice..., in Bolivar County, Mississippi, and Desha County, Arkansas. The applications were filed by...

  19. 77 FR 2290 - FFP Project 30, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Science.gov (United States)

    2012-01-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 30, LLC and Northland Power Mississippi River LLC; Notice..., in West Feliciana and Pointe Coupee Parishes, Louisiana. The applications were filed by FFP...

  20. Preliminary evaluation of a prototype welfare monitoring system for sows and piglets (Welfare Quality (R) project)

    NARCIS (Netherlands)

    Scott, K.; Binnendijk, G.P.; Edwards, S.A.; Gu, J.H.; Wijhe-Kiezebrink, van M.C.; Vermeer, H.M.

    2009-01-01

    The Welfare Quality(R) project aims to develop a European on-form welfare assessment standard for pigs, amongst other species. A prototype monitoring system was developed for sows and piglets using predominantly animal-based measures of behaviour, health and physiology to assess welfare. The prototy

  1. Design and Preliminary Evaluation of the r-Gamma Display Concept Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this proposed Phase II SBIR effort is to continue Phase I efforts to develop and assess the feasibility of an innovative new flight instrument...

  2. 76 FR 73613 - Oliver Hydro LLC; FFP Project 97 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ...-wide tailrace; and (5) a proposed 1.6-mile-long, 25 kilo-volt (KV) transmission line to an existing... 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed...

  3. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  4. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    Science.gov (United States)

    2013-05-06

    ... early restoration projects that will provide meaningful benefits to accelerate restoration in the Gulf... resource services for the public's benefit while the longer-term process of fully assessing injury and... review of a draft, a Phase I Early Restoration Plan/Environmental Assessment (Phase I ERP) in April 2012...

  5. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... quality conformity; and Finding of No Significant Impact (FONSI), dated March 2012. Supporting...: No use of Section 4(f) resources; Section 106 finding of no adverse effect; project-level air quality... History Museum in Forest Park in St. Louis to Trinity Avenue in University City, MO. Final agency...

  6. Research Proposal: Methodology for Assessment Frameworks in Large-scale Infrastructural Water Projects

    NARCIS (Netherlands)

    Hommes, Saskia

    2005-01-01

    Water management is a central and ongoing issue in the Netherlands. Large infrastructural projects are being carried out and planned in a number of water systems. These initiatives operate within a complex web of interactions, between short- and long-term, economic costs and benefits, technical feas

  7. 78 FR 46858 - Proposed Waiver and Extension of the Project Period for the Individuals With Disabilities...

    Science.gov (United States)

    2013-08-02

    ... Dialogue Guides, focused on education reform efforts such as standards-based assessment, college- and... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION 34... Disabilities Education Act (IDEA) Partnership Project AGENCY: Office of Special Education Programs...

  8. Project proposal : control of crested wheatgrass by relocation of black-tailed prairie dogs

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Proposal for research at the Rocky Mountain Arsenal to examine experimental means of controlling crested wheatgrass while establishing relocated prairie dog colonies...

  9. 78 FR 26103 - Proposed Standard Operating Procedure (SOP) of the Aircraft Certification Service (AIR) Project...

    Science.gov (United States)

    2013-05-03

    ... Federal Aviation Administration Proposed Standard Operating Procedure (SOP) of the Aircraft Certification... comments on, the Aircraft Certification Service (AIR) standard operating procedure (SOP) describing the... comments on the SOP to: Federal Aviation Administration (FAA) Aircraft Certification Service,...

  10. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  11. Improvements Needed at the Defense Advanced Research Projects Agency When Evaluating Broad Agency Announcement Proposals

    Science.gov (United States)

    2013-09-06

    research. The program manager recommends the proposal(s) for funding to the Scientific Review Official ( SRO ) within a Program Manager Summary Sheet. (See...matter expert worksheets, and the Program Manager Summary Sheet and forwards this package to the SRO for his or her concurrence. The SRO reviews...award. The SRO signs the Program Manager Summary Sheet to indicate concurrence with the program manager’s selection. Then the SRO signs the ARPA

  12. Preliminary project of s Thomson scattering system for the ETE tokamak; Projeto preliminar de um sistema de espalhamento Thomson para o Tokamak ETE

    Energy Technology Data Exchange (ETDEWEB)

    Berni, Luiz Angelo

    1997-12-31

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light 4 refs., 26 figs.

  13. EC Project 'GUIDELINES ON MPE': proposed qualification and curriculum frameworks and the MPE in nuclear medicine

    Energy Technology Data Exchange (ETDEWEB)

    Caruana, C J, E-mail: carmel.j.caruana@um.edu.mt [EFOMP Representative on the EC ' Guidelines on MPE' Project and Biomedical Physics, Faculty of Health Sciences, University of Malta (Malta)

    2011-09-23

    The objectives of EC project 'Guidelines on Medical Physics Expert' are to provide for improved implementation of the provisions relating to the Medical Physics Expert within Council Directive 97/43/EURATOM and the proposed recast Basic Safety Standards directive. This includes harmonisation of the mission statement for Medical Physics Services as well as the education and training of the MPE. It also includes detailed knowledge-skills-competence inventories for the Medical Physics Expert in each of Diagnostic and Interventional Radiology, Nuclear Medicine and Radiotherapy. This paper presents the proposed Qualification and Curriculum Frameworks and their application to the Medical Physics Expert in Nuclear Medicine.

  14. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-07

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  15. Projeto larga escala: uma proposta pedagógica atual Larga escala project: an actual pedagogic proposal

    Directory of Open Access Journals (Sweden)

    Anna Luiza de F. P. Lins Gryschek

    2000-06-01

    Full Text Available Discorre-se sobre um projeto de formação dos atendentes de enfermagem, o conhecido "Projeto Larga Escala", seu histórico, a legislação que o ampara e a sua trajetória na Secretaria Municipal da Saúde do Município de São Paulo. Conclui-se que o "Projeto Larga Escala" é uma proposta pedagógica válida, devendo ser incentivada e ampliada em âmbito nacional.This study discourses about a nursing project, the well known "Larga Escala Project", its history, the legislation that gives support to it and its trajectory in the Health Secretary of the Township of São Paulo. The conclusion is that the "Larga Escala Project" is a valid pedagogic proposal and it must be encouraged and amplified to all the national field.

  16. Evaluating Proposed Investments in Power System Reliability and Resilience: Preliminary Results from Interviews with Public Utility Commission Staff

    Energy Technology Data Exchange (ETDEWEB)

    LaCommare, Kristina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Eto, Joseph [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-01-01

    Policymakers and regulatory agencies are expressing renewed interest in the reliability and resilience of the U.S. electric power system in large part due to growing recognition of the challenges posed by climate change, extreme weather events, and other emerging threats. Unfortunately, there has been little or no consolidated information in the public domain describing how public utility/service commission (PUC) staff evaluate the economics of proposed investments in the resilience of the power system. Having more consolidated information would give policymakers a better understanding of how different state regulatory entities across the U.S. make economic decisions pertaining to reliability/resiliency. To help address this, Lawrence Berkeley National Laboratory (LBNL) was tasked by the U.S. Department of Energy Office of Energy Policy and Systems Analysis (EPSA) to conduct an initial set of interviews with PUC staff to learn more about how proposed utility investments in reliability/resilience are being evaluated from an economics perspective. LBNL conducted structured interviews in late May-early June 2016 with staff from the following PUCs: Washington D.C. (DCPSC), Florida (FPSC), and California (CPUC).

  17. Preliminary Assessment of the Nuclide Migration from the Activation Zone Around the Proposed Spallation Neutron Source Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dole, L.R.

    1998-09-01

    The purpose of this study is to investigate the potential impacts of migrating radionuclides from the activation zone around the proposed Spallation Neutron Source (SNS). Using conservatively high estimates of the potential inventory of radioactive activation products that could form in the proposed compacted-soil shield berm around an SNS facility on the Oak Ridge Reservation (ORR), a conservative, simplified transport model was used to estimate the potential worst-case concentrations of the 12 long-lived isotopes in the groundwater under a site with the hydrologic characteristics of the ORR. Of the 12, only 3 isotopes showed any potential to exceed the U.S. Nuclear Regulatory Commission (NRC) 10 Code of Federal Regulations (CFR) Part 20 Drinking Water Limits (DWLs). These isotopes were 14C, 22Na, and 54Mn. The latter two activation products have very short half-lives of 2.6 years and 0.854 year, respectively. Therefore, these will decay before reaching an off-site receptor, and they cannot pose off-site hazards. However, for this extremely conservative model, which overestimates the mobility of the contaminant, 14C, which has a 5,730-year half-life, was shown to represent a potential concern in the context of this study's conservative assumptions. This study examines alternative modifications to the SNS shield berm and makes recommendations.

  18. 78 FR 44111 - FFP Project 123, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-07-23

    ...-foot-wide tailrace with a 300-foot- long retaining wall; (4) a 4.16/36.7 kilo-Volt (kV) substation; and (5) a 1.0-mile-long, 36.7kV transmission line. The proposed project would have an average annual... notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of...

  19. 78 FR 26360 - FFP Project 112, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-05-06

    ...- long retaining wall; (4) a 4.16/69 kilo-Volt (kV) substation; and (5) a 0.3-mile-long, 69 kV transmission line. The proposed project would have an average annual generation of 36,900 megawatt-hours, and... notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of...

  20. Results of Sediment Sampling and Elutriate Testing at the Proposed Glovers Point Shallow Water Habitat Project Site

    Science.gov (United States)

    2013-04-01

    Manganese ; Warmwater Aquatic Life Class A and Public Drinking Water Constituent Acute Standard Chronic Standard Public Drinking Water Standard...sediment/soil samples at the proposed Glovers Point project site were less than the Nebraska chronic and public drinking water criteria for Manganese ...Warmwater Aquatic Life Class A, Agricultural Water Supply, and Aesthetics. It has designated the use of public drinking water supply to the river

  1. Economic and Risk Analyses for SMEs Internationalization Projects. A Preliminary Insight on the Rationale of Business Consulting Firms

    Directory of Open Access Journals (Sweden)

    Elena - Madalina VĂTĂMĂNESCU

    2014-06-01

    Full Text Available The present study is meant to be a first step towards the investigation of two current issues: the organization’s demand for highly professional services and the business consulting firms’ response as a challenge for the ethic imperatives. The main question raised is whether the national business consulting firms are liable to provide the economic and risk analyses required by the ambitious internationalization projects of small and medium enterprises (SMEs, and if not, what should be the firms’ ethical approach. In this respect, preliminary conclusions were made after testing the deliverables of several business consulting firms which were contracted to elaborate intricate economic and risk analyses of an internationalization project developed by a medium enterprise. The proven level of expertise of the contracted firms did not confirm their claims and assurances that they were fit for the job. This is why the rationale of today’s business consulting firms should be taken into account for further consideration while the exigency for increased savvy should become a priority.

  2. Preliminary evaluation of specific absorbed fraction (SAF) in ICRP reference phantom conversion project

    Energy Technology Data Exchange (ETDEWEB)

    Thang, Nguyen Tat; Yeom, Yeon Soo; Han, Min Cheol; Jun, Wang Zhao; Kim, Han Sung; Kim, Seong Hoon; Kim, Chan Hyeong [Hanyang University, Seoul (Korea, Republic of)

    2014-11-15

    The ICRP reference phantoms, due to their low voxel resolutions, provide incorrect dose values for weakly penetrating radiations. To overcome the limitations, we are now converting the ICRPvoxel phantoms to polygonal surface models in order to develop the polygonal surface version of the ICRP reference phantoms. The ultimate goal of the conversion project is to develop a set of polygonal surface ICRP phantoms which provide correct dose values for weakly penetrating radiations while providing identical dose values with those of the ICRP reference phantoms for highly penetrating radiations. It was confirmed that indeed the current ICRP male polygonal phantom showed generally good agreement with the ICRP male voxel phantom following the objective of the ICRP phantom conversion project. However, relatively large discrepancies were found in the colon doses at 0.03 MeV. We believe that the discrepancies could be sufficiently reduced by adjusting the colon polygonal model to be more similar to the voxel model in the further study.

  3. The Educational Project as a pivotal framework for pedagogical practice: reflections and proposals for action

    Directory of Open Access Journals (Sweden)

    Javier ARGOS GONZÁLEZ

    2011-09-01

    Full Text Available The basic features of an educational task are sufficiently complex to demand their «construction» from theoretical-pedagogical frameworks that are consistent, rigorous and ethically founded. To achieve this end, the coherence and meaning of such a task become transformed into indispensable elements which need to be projected, both into the school and into the classroom, which, in the last resort, is where the important pedagogical formulae that have been adopted on consensus are given shape. Taking these considerations into account, we analyse in the present research the importance of the educational School Project, as a text which upholds the pedagogical task, before going on to formulate a series of postulates which should be upheld in our professional practice. Thus elements such as the pedagogy of listening, unhurried learning, and intuition, creativity, curiosity and pleasure in learning emerge and are visible in the pedagogical scene.

  4. Projection-reflection ultrasound images using PE-CMOS sensor: a preliminary bone fracture study

    Science.gov (United States)

    Lo, Shih-Chung B.; Liu, Chu-Chuan; Freedman, Matthew T.; Mun, Seong-Ki; Kula, John; Lasser, Marvin E.; Lasser, Bob; Wang, Yue Joseph

    2008-03-01

    In this study, we investigated the characteristics of the ultrasound reflective image obtained by a CMOS sensor array coated with piezoelectric material (PE-CMOS). The laboratory projection-reflection ultrasound prototype consists of five major components: an unfocused ultrasound transducer, an acoustic beam splitter, an acoustic compound lens, a PE-CMOS ultrasound sensing array (Model I400, Imperium Inc. Silver Spring, MD), and a readout circuit system. The prototype can image strong reflective materials such as bone and metal. We found this projection-reflection ultrasound prototype is able to reveal hairline bone fractures with and without intact skin and tissue. When compared, the image generated from a conventional B-scan ultrasound on the same bone fracture is less observable. When it is observable with the B-scan system, the fracture or crack on the surface only show one single spot of echo due to its scan geometry. The corresponding image produced from the projection-reflection ultrasound system shows a bright blooming strip on the image clearly indicating the fracture on the surface of the solid material. Speckles of the bone structure are also observed in the new ultrasound prototype. A theoretical analysis is provided to link the signals as well as speckles detected in both systems.

  5. Kelly Hot Spring Geothermal Project: Kelly Hot Spring Agricultural Center preliminary design. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Longyear, A.B. (ed.)

    1980-08-01

    A Phase 1 Preliminary Design, Construction Planning and Economic Analysis has been conducted for the Kelly Hot Spring Agricultural Center in Modoc County, California. The core activity is a 1360 breeding sow, swine raising complex that utilizes direct heat energy from the Kelly Hot Spring geothermal resource. The swine is to be a totally confined operation for producing premium pork in controlled-environment facilities. The complex contains a feed mill, swine raising buildings and a complete waste management facility that produces methane gas to be delivered to a utility company for the production of electricity. The complex produces 6.7 million pounds of live pork (29,353 animals) shipped to slaughter per year; 105,000 cu. ft. of scrubbed methane per day; and fertilizer. Total effluent is less than 200 gpm of agricultural quality-water with full odor control. The methane production rate made possible with geothermal direct heat is equivalent to at least 400 kw continuous. Sale of the methane on a co-generation basis is being discussed with the utility company. The use of geothermal direct heat energy in the complex displaces nearly 350,000 gallons of fuel oil per year. Generation of the biogas displaces an additional 300,000 gallons of fuel oil per year.

  6. Physical Activity in Solid Organ Transplant Recipients: Preliminary Results of the Italian Project

    Directory of Open Access Journals (Sweden)

    Giovanni Mosconi

    2014-07-01

    Full Text Available Background/Aims: The role of physical activity in transplanted patients is often underestimated. We discuss the Italian National Transplant Centre experience, which started in 2008 studying transplanted patients involved in sports activities. The study was then developed through a model of cooperation between surgeons, sports physicians and exercise specialists. Methods: A multicentre study was realized in 120 transplanted patients of which 60 treated with supervised physical activity (three sessions/week of aerobic and strengthening exercises and 60 controls. We present the results of the first 26 patients (16 males, 10 females; 47.8±10.0 years; 21 kidney, 5 liver transplanted; time from transplant 2.3±1.4 years who completed 12 months of supervised physical activity. Results: Data showed an increase of peak aerobic power (t=4.535; PConclusion: These preliminary results confirm the positive effects of supervised physical exercise. It can be considered as an input to promote other detailed exercise protocols.

  7. Proposal for the Extension of a Project Agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2002-01-01

    This document concerns the extension of the scope of work covered by a project agreement with the ISTC, entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medicine and Pharmacology" which was approved by Finance Committee on 19 September 2001 (CERN/FC/4478). For the reasons set out in this document, the Finance Committee is invited to approve the extension of the scope of work covered by the above project agreement for the optimisation of the technology for a total amount of 160 000 US dollars. This extension will be partially funded by two external sponsors (RAYTEST - DE and the UNIVERSITY OF LAUSANNE - CH) at the level of 90 000 US dollars. CERN's contribution, which will be funded by revenue generated by its technology transfer activities, will not exceed 70 000 US dollars. This extension will bring the total amount of the Project Agreement to 935 000 US dollars, of which CERN's total contribution will not exceed 320 000 US dollars...

  8. Preliminary assessment of the aquatic impacts of a proposed defense waste processing facility at the Savannah River Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mackey, H.E. Jr.

    1979-01-01

    A review of the literature indicates that a significant body of descriptive information exists concerning the aquatic ecology of Upper Three Runs Creek and Four Mile Creek of the Savannah River Plant south of Aiken, South Carolina. This information is adequate for preparation of an environmental document evaluating these streams. These streams will be impacted by construction and operation of a proposed Defense Waste Processing Facility for solidification of high level defense waste. Potential impacts include (1) construction runoff, erosion, and siltation, (2) effluents from a chemical and industrial waste treatment facility, and (3) radionuclide releases. In order to better evaluate potential impacts, recommend mitigation methods, and comply with NEPA requirements, additional quantitative biological information should be obtained through implementation of an aquatic baseline program.

  9. Orthorexia nervosa: a preliminary study with a proposal for diagnosis and an attempt to measure the dimension of the phenomenon.

    Science.gov (United States)

    Donini, L M; Marsili, D; Graziani, M P; Imbriale, M; Cannella, C

    2004-06-01

    To propose a diagnostic proceeding and to try to verify the prevalence of orthorexia nervosa (ON), an eating disorder defined as "a maniacal obsession for healthy foods". 404 subjects were enrolled. Diagnosis of ON was based on both the presence of a disorder with obsessive-compulsive personality features and an exaggerated healthy eating behaviour pattern. Of the 404 subjects examined, 28 were found to suffer from ON (prevalence of 6.9%). The analysis of the physiological characteristics, the social-cultural and the psychological behaviour that characterises subjects suffering from ON shows a higher prevalence in men and in those with a lower level of education. The orthorexic subjects attribute characteristics that show their specific "feelings" towards food ("dangerous" to describe a conserved product, "artificial" for industrially produced products, "healthy" for biological produce) and demonstrate a strong or uncontrollable desire to eat when feeling nervous, excited, happy or guilty.

  10. Proposal of a Video-recording System for the Assessment of Bell's Palsy: Methodology and Preliminary Results.

    Science.gov (United States)

    Monini, Simonetta; Marinozzi, Franco; Atturo, Francesca; Bini, Fabiano; Marchelletta, Silvia; Barbara, Maurizio

    2017-09-01

    To propose a new objective video-recording procedure to assess and monitor over time the severity of facial nerve palsy. No objective methods for facial palsy (FP) assessment are universally accepted. The face of subjects presenting with different degrees of facial nerve deficit, as measured by the House-Brackmann (HB) grading system, was videotaped after positioning, at specific points, 10 gray circular markers made of a retroreflective material. Video-recording included the resting position and six ordered facial movements. Editing and data elaboration was performed using a software instructed to assess marker distances. From the differences of the marker distances between the two sides was then extracted a score. The higher the FP degree, the higher the score registered during each movement. The statistical significance differed during the various movements between the different FP degrees, being uniform when closing the eyes gently; whereas when wrinkling the nose, there was no difference between the HB grade III and IV groups and, when smiling, no difference was evidenced between the HB grade IV and V groups.The global range index, which represents the overall degree of FP, was between 6.2 and 7.9 in the normal subjects (HB grade I); between 10.6 and 18.91 in HB grade II; between 22.19 and 33.06 in HB grade III; between 38.61 and 49.75 in HB grade IV; and between 50.97 and 66.88 in HB grade V. The proposed objective methodology could provide numerical data that correspond to the different degrees of FP, as assessed by the subjective HB grading system. These data can in addition be used singularly to score selected areas of the paralyzed face when recovery occurs with a different timing in the different face regions.

  11. The Italian bat roost project: a preliminary inventory of sites and conservation perspectives

    Directory of Open Access Journals (Sweden)

    Gruppo Italiano di Ricerca sui Chirotter GIRC

    2005-01-01

    Full Text Available Abstract The Italian bat roost project, launched by the Italian Chiroptera Research Group (GIRC, aims to develop a constantly updated national database of bat roosts. Short-term objectives are to inventory roosts and identify the most important ones from a conservation perspective, in order to set priorities for management actions. Published records and field data from 1990 onwards are filed. To date, the database contains 1243 records from 750 roosts, covering 352 10x10 km UTM grid-cells. Among roosts, 167 were used for hibernation (S roosts, 244 for breeding (R roosts and 431 as either temporary roosts or for unknown needs, not verified or not considered in the survey (X roosts. Roosting sites occurred in buildings (45.1%, caves (35.3%, artificial underground sites (10.3%, trees (5.5%, bridges (2.1%, bat boxes (1.3% and rocky cliffs (0.4%. At least 29 species were found, and the number of roosts per species ranged between 1 and 261. S and/or R roosts fulfilling certain combinations of number of species and individuals or having at least 50 individuals of species cited in Annex II of the 92/43/EEC Directive (excluding Miniopterus schreibersii, adding Myotis punicus were classified as sites of special conservation interest. When meeting at least one such conditions, type X roosts that were not classified as either S or R, were considered potential sites of special conservation interest, for which further data collection is recommended. In all, 97 roosts of special conservation interest were identified: 30 S roosts, 60 R roosts and 7 roosts selected for both hibernation and breeding. 20 X roosts were identified as potential sites of special conservation interest. For at least 93.7% of roosts, factors potentially harming the bats were documented, particularly people access to the roost, and renovation of buildings used as a roost. In almost two thirds of such cases it was judged that conservation was not ensured

  12. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ... EA regarding its proposal for the Trust's evaluation and revision. In accordance with 40 CFR 1506.5(b... CFR 1506.5(c), the EIS shall be prepared by the Trust and/or by contractors who are selected by the... ensuring its adequacy. The EIS shall be prepared in accordance with 40 CFR part 1502. (g) The...

  13. 64 FR 18634 - Proposed Ridgewater Water Distribution System Project in Wyoming

    Science.gov (United States)

    1999-04-15

    ... Office of Surface Mining Reclamation and Enforcement Proposed Ridgewater Water Distribution System... Improvement District water distribution system in Converse County, Wyoming. In its application, the State... distribution system in Converse County, Wyoming. This water distribution system is a public facility in a...

  14. Palmdale Energy Project - Public Hearing and Request for Public Comment on Proposed PSD Permit

    Science.gov (United States)

    EPA provides notice of, and requests public comment on, EPA’s proposed action relating to a Clean Air Act (CAA) Prevention of Significant Deterioration (PSD) permit application (Application) for the construction of a natural gas-fired combined cycle power.

  15. 76 FR 35864 - Proposed Priority; Special Demonstration Programs-National Technical Assistance Projects To...

    Science.gov (United States)

    2011-06-20

    ... supports ten regional Technical Assistance and Continuing Education (TACE) centers that provide TA and..., including, but not limited to, the TACE Centers, the American Indian Vocational Rehabilitation Technical... Doc No: 2011-15293] DEPARTMENT OF EDUCATION [CFDA 84.235M] Proposed Priority; Special...

  16. 76 FR 17396 - Proposed Priorities: Disability and Rehabilitation Research Projects and Centers Program

    Science.gov (United States)

    2011-03-29

    ... blind orientation, navigation, and wayfinding. In addition, NIDRR grantees are researching and... measurement instruments, tools, and materials. Proposed Priority 2--RERC on Wireless Technologies. Background...: Findings from a policy research instrument. Assist Technol. Fall; 20(3): 149-56. Mueller, J., Jones, M...

  17. "Preliminary Evaluation of Climate Change impact in the Codegua's River Irrigation Improvement Project"

    Science.gov (United States)

    Ricchetti, Franco; Vargas, Ximena

    2017-04-01

    The aim of this study is to quantify the impact of Climate Change in one of the projected dams for farming activities in Codegua's catchment, near to Santiago, Chile. This reservoir is one of the twenty that will be built by the Hydraulics Infrastructure Management Department of Chile in the next years. The design is based on the concept of "Irrigation Security", defined as the quotient between the number of years where is possible to deliver the crop demand and the total of years. It must be greater than 85% to approve the project. The evaluation of Climate Change is based in two scenarios: RCP 4.5 and RCP 8.5. The forecast hydroclimatology is based in General Circulation Model MPI-ESM, from Max Planck Institute, Germany. The evaluation considers two future periods: a near future (2020-2055) and a further future (2065-2100). First, statistical downscaling of precipitation and temperature time series are made and then the yearly inflow to the dam is estimated by a simple rainfall-runoff relation, the future evapotranspiration is estimated by Penman-Monteith method and with an empirical mathematical relation, based in Blaney and Criddle method. For this reason, the analysis included additional scenarios to incorporate the uncertainty in the evapotranspiration estimation as well as on tributary volumes from the basin to the dam, for each Climate Change scenarios. Climate Change in the zone of study indicates that precipitations will be lower than the present and the temperature will increase. For example, the results predict that precipitation in the best scenario, for near future, will go down 15% and temperature will increase in 0.6 (°C). For the further future in the worst scenarios, model predicts that precipitation will go down around 30% and temperature will increase 2.5 (°C). This coupled effects modify in a great way the water supply and demand in the zone of study. With the new hydrology forecast for the future, the "Irrigation Security" is recalculated in

  18. Isospin mixing of isospin-projected Slater determinants: formalism and preliminary applications

    CERN Document Server

    Rafalski, M; Dobaczewski, J

    2008-01-01

    We report on the development of a new theoretical tool that allows for isospin projection of Slater determinants and we present its first applications. In particular, we determine the isospin mixing in ground states of N=Z nuclei and discuss its dependence on the size of the harmonic-oscillator basis used in the calculations. We also discuss the unphysical contribution to the isospin mixing caused by the spurious isospin-symmetry breaking inherent to the mean-field approach. We show that these contributions may be as large as 30% of the value of the isospin-mixing parameter.

  19. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  20. Potential cost to Western Australia of proposed patient co-payments according to healthcare organisational structure: A preliminary analysis.

    Science.gov (United States)

    Millar, J Alasdair; Millar, Robyn C

    2014-01-01

    The Australian federal government has proposed an AUD $7 patient co-payment for a general practitioner (GP) consultation. One effect of the co-payment may be that patients will seek assistance at public hospital emergency departments (EDs), where currently there is no user charge. We studied the possible financial impact of patient diversion on the Western Australia (WA) health budget. We constructed a spreadsheet model of changes in annual cash flows including the co-payment, GP fees for service, and rates of diversion to emergency departments with additional marginal costs for ED attendance. Changes in WA cash flows are the aggregate of marginal ED costs of treating diverted patients and added expenditure in fees paid to rural doctors who also man local emergency centres. The estimated costs to WA are AUD $6.3 million, $35.9 million and $87.4 million at 1, 5, and 10 per cent diversion, respectively. Commonwealth receipts increase and expenditure on Medicare benefits declines. A diversion of patients from GP surgeries to ED in WA caused by the co-payment will result in increased costs to the state, which may be substantial, and will reduce net costs to the Commonwealth.

  1. Florar Project: a forest proposal to PETROBRAS-TRANSPETRO; Projeto Florar: uma proposta florestal para a PETROBRAS-TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Melo Neto, Joao Evangelista de; Martini, Andrea Dietrich; Ozorio, Tarcisio Faria; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work presents for discussion a proposal of a forest project idealized to be implemented, in form of a linear forest, in the long of TRANSPETRO pipeway, from north to south of the country. The initial goals, restricted to the State of Sao Paulo, presume the forest fomentation of 1,000 kilometers of path, covering an area of approximately 10,000 hectares, where can be possible to realize native and exotic species plantation, considering the legal restrictions. The proposal presumes also a fund to the special nature reserve creation in the cities crossed by TRANSPETRO pipeways. The pilot proposed in this work could take place at 'Plano Diretor de Dutos de Sao Paulo', which involves 27 cities, incorporating the environmental recuperation programs from native vegetation suppression and intervention in permanent preservation area in terms of forest law. (author)

  2. Projecting the self into the future in individuals with schizophrenia: a preliminary cross-sectional study.

    Science.gov (United States)

    Raffard, Stéphane; Bortolon, Catherine; D'Argembeau, Arnaud; Gardes, Jeanne; Gely-Nargeot, Marie-Christine; Capdevielle, Delphine; Van der Linden, Martial

    2016-07-01

    The ability to project oneself into the future contributes to development and maintenance of a coherent sense of identity. If recent research has revealed that schizophrenia is associated with difficulties envisioning the future, little is known about patients' future self-representations. In this study, 27 participants with schizophrenia and 26 healthy controls were asked to simulate mental representations of plausible and highly significant future events (self-defining future projections, SDFPs) that they anticipate to happen in their personal future. Main results showed that schizophrenia patients had difficulties in reflecting on the broader meaning and implications of imagined future events. In addition, and contrary to our hypothesis, a large majority of SDFPs in schizophrenia patients were positive events, including achievements, relationship, and leisure contents. Interestingly, patients and controls did not differ on the perceived probability that these events will occur in the future. Our results suggest that schizophrenia patients have an exaggerated positive perception of their future selves. Together, these findings lend support to the idea that past and future self-defining representations have both similar and distinct characteristics in schizophrenia.

  3. 76 FR 67173 - Arkansas Electric Cooperative Corp.; FFP Project 1 LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2011-10-31

    ... dam, containing four generating units with a total capacity of 36.0 megawatt (MW); (3) a 1,200-foot- long, 450-foot-wide tailrace; and (4) a proposed 4.0-mile-long, 115 kilo-volt (kV) transmission line to... notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of...

  4. Proposed Applications for the Gateway and Data Node in the IPSL Prodiguer Portal Project.

    Science.gov (United States)

    Bhardwaj, Ashish; Denvil, Sébastien; Morgan, Mark

    2010-05-01

    The Pierre Simon Laplace Institut (IPSL), like many other modeling groups, is involved in the development of a comprehensive Earth System Model (ESM) to study the interactions between physical, chemical and biological processes. This work entails the coupling of the different components (land, ocean, atmosphere, chemistry etc.) that demands an execution environment and platform that can tackle the entire range of interdependent model configurations. Furthermore, the ever-increasing number of simulations, executed against model configurations within scientific computing centres, is generating a huge volume of data and meta-data that must be made available to researchers, scientists, modelers, students and general users. To achieve these objectives, we have decided to integrate the efforts made by International and European projects like Earth System Grid, METAFOR and IS-ENES within our execution environment. Prodiguer Project is an initiative of IPSL, France for the availability of climate models simulations data and metadata generated at the scientific computing centres to the French and International community. The presentation will focus on the applications (web based and desktop application) to be developed for the gateway and data node at IPSL which includes: 1. Simulation Monitor (Gateway Web Application) 2. Data Node Metadata Query API (Data Node Application) NOTE: A collaboration scenario is likely to emerge among IPSL-Paris, BADC-UK and DKRZ-Hamburg regarding development and/or testing of the API. 3. Administrative Control Panel for the ESG Data Node and Metadata Database (Data Node Application)

  5. Are REDD+ community forest projects following the principles for collective action, as proposed by Ostrom?

    Directory of Open Access Journals (Sweden)

    Abdul-Razak Saeed

    2017-03-01

    Full Text Available Forested countries in the global south that have agreed to engage in REDD+, a policy mechanism for addressing climate change, are receiving support to improve laws, policies, systems and structures. As a mechanism initiated at the global level and seeking to use forests to address a global commons crisis (atmospheric carbon concentration, understanding how REDD+ translates into implementation at the local level is essential. Therefore, using a systematic review approach, we examined 15 studies of REDD+ in the context of public and/or community managed forests, drawn from a comprehensive application of inclusion criteria to identify relevant published peer-reviewed empirical research. The common property resources literature was used to highlight the role of local institutions in REDD+ and to distil how REDD+ community forest projects conform to Ostrom’s collective action principles. The review revealed limited sharing of information and decision-making authority with communities; a general absence of FPIC; and a lack of defined benefit sharing and conflict resolution arrangements in many of the REDD+ projects.

  6. Preliminary results from the ESA STSE project on SST diurnal variability, its regional extent and implications in atmospheric modelling (SSTDV:R.EX.–IM.A.M.)

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Hasager, Charlotte Bay; Høyer, Jacob L.

    2013-01-01

    This study presents some preliminary results of the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). Comparisons of SEVIRI SST with AATSR......, the 1-dimensional General Ocean Turbulence Model (GOTM) is applied. Preliminary results show that the initial temperature and salinity profiles may give a warmer start-up in the model while the light extinction scheme is a controlling factor for the amplitude and vertical extend of the daily signal....

  7. The Moon Zoo citizen science project: Preliminary results for the Apollo 17 landing site

    CERN Document Server

    Bugiolacchi, Roberto; Tar, Paul; Thacker, Neil; Crawford, Ian A; Joy, Katherine H; Grindrod, Peter M; Lintott, Chris

    2016-01-01

    Moon Zoo is a citizen science project that utilises internet crowd-sourcing techniques. Moon Zoo users are asked to review high spatial resolution images from the Lunar Reconnaissance Orbiter Camera (LROC), onboard NASAs LRO spacecraft, and perform characterisation such as measuring impact crater sizes and identify morphological features of interest. The tasks are designed to address issues in lunar science and to aid future exploration of the Moon. We have tested various methodologies and parameters therein to interrogate and reduce the Moon Zoo crater location and size dataset against a validated expert survey. We chose the Apollo 17 region as a test area since it offers a broad range of cratered terrains, including secondary-rich areas, older maria, and uplands. The assessment involved parallel testing in three key areas: (1) filtering of data to remove problematic mark-ups; (2) clustering methods of multiple notations per crater; and (3) derivation of alternative crater degradation indices, based on the s...

  8. High Temperature Gas-Cooled Reactor Projected Markets and Preliminary Economics

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick

    2011-08-01

    This paper summarizes the potential market for process heat produced by a high temperature gas-cooled reactor (HTGR), the environmental benefits reduced CO2 emissions will have on these markets, and the typical economics of projects using these applications. It gives examples of HTGR technological applications to industrial processes in the typical co-generation supply of process heat and electricity, the conversion of coal to transportation fuels and chemical process feedstock, and the production of ammonia as a feedstock for the production of ammonia derivatives, including fertilizer. It also demonstrates how uncertainties in capital costs and financial factors affect the economics of HTGR technology by analyzing the use of HTGR technology in the application of HTGR and high temperature steam electrolysis processes to produce hydrogen.

  9. Small scale observation of magnetopause motion: preliminary results of the INTERBALL project

    Directory of Open Access Journals (Sweden)

    J. Safrankova

    Full Text Available Two satellites of the INTERBALL project were launched on 3 August 1995. The main goals of the present paper are (1 to give a brief information about the VDP plasma device onboard the INTERBALL-1 satellite, (2 to present the Faradays cup data taken in different magnetospheric regions and (3 to expose first results of the two satellite measurements of the magnetopause motion. The presented data illustrate magnetopause crossings as seen by two satellites when separated by about ~ 1000 km. This separation combined with the Faraday's cup time resolution allows to estimate the velocity of the magnetopause and to reconstruct a possible structure of the boundary. Simultaneous measurement of the magnetic field supports the interpretation of the observed ion fluxes as a signature of the wavy motion of the boundary.

  10. The Moon Zoo citizen science project: Preliminary results for the Apollo 17 landing site

    Science.gov (United States)

    Bugiolacchi, Roberto; Bamford, Steven; Tar, Paul; Thacker, Neil; Crawford, Ian A.; Joy, Katherine H.; Grindrod, Peter M.; Lintott, Chris

    2016-06-01

    Moon Zoo is a citizen science project that utilises internet crowd-sourcing techniques. Moon Zoo users are asked to review high spatial resolution images from the Lunar Reconnaissance Orbiter Camera (LROC), onboard NASA's LRO spacecraft, and perform characterisation such as measuring impact crater sizes and identify morphological 'features of interest'. The tasks are designed to address issues in lunar science and to aid future exploration of the Moon. We have tested various methodologies and parameters therein to interrogate and reduce the Moon Zoo crater location and size dataset against a validated expert survey. We chose the Apollo 17 region as a test area since it offers a broad range of cratered terrains, including secondary-rich areas, older maria, and uplands. The assessment involved parallel testing in three key areas: (1) filtering of data to remove problematic mark-ups; (2) clustering methods of multiple notations per crater; and (3) derivation of alternative crater degradation indices, based on the statistical variability of multiple notations and the smoothness of local image structures. We compared different combinations of methods and parameters and assessed correlations between resulting crater summaries and the expert census. We derived the optimal data reduction steps and settings of the existing Moon Zoo crater data to agree with the expert census. Further, the regolith depth and crater degradation states derived from the data are also found to be in broad agreement with other estimates for the Apollo 17 region. Our study supports the validity of this citizen science project but also recommends improvements in key elements of the data acquisition planning and production.

  11. Preliminary experience with dynamic MR projection angiography in the evaluation of cervicocranial steno-occlusive disease

    Energy Technology Data Exchange (ETDEWEB)

    Wetzel, S.G.; Haselhorst, R.; Bilecen, D.; Radue, E.W. [Section of Neuroradiology, Kantonsspital Basel (Switzerland); Lyrer, P.A. [Dept. of Neurology, Kantonsspital Basel (Switzerland); Seifritz, E. [Psychiatric University Hospital Basel (Switzerland); Bongartz, G. [Inst. for Diagnostic Radiology, Kantonsspital Basel (Switzerland); Scheffler, K. [Department of Diagnostic Radiology, University of Freiburg, Freiburg (Germany)

    2001-02-01

    The application of a contrast-enhanced, two-dimensional MR technique, which provides dynamic projection angiograms at a subsecond temporal frame rate for depiction of the cervical and intracranial arteries, was evaluated in three healthy volunteers and seven patients with various cervicocranial steno-occlusive diseases. Intra-arterial digital subtraction angiography (DSA) served as standard of reference for findings in the patients. Magnetic resonance projection angiography (MRPA) was performed on a standard 1.5-T clinical MR imaging system at intravenous injection of a single dose of contrast agent (0.1 mmol/kg GdDTPA-BMA). Sixty consecutive images of the cerebral circulation were acquired at a temporal frame rate of 900 ms per image in the coronal plane. The collateral flow and the perfusion of the compromised vessel territory were readily assessed by MPRA in patients with occlusion of the internal cerebral artery (ICA) or middle cerebral artery (MCA). The leptomeningeal collateralisation of these patients was displayed in a dynamic fashion. Furthermore, quantitative perfusion measurement provided a difference between both MCA territories in the time to peak ({delta}DTTP) of the contrast bolus of 1.12 {+-} 0.28 s in five patients with severe stenosis or occlusion of the ICA (healthy volunteers 0.19 {+-} 0.05 s). However, important pathological findings, such as the evaluation of carotid artery stenoses and the intracranial collateral flow pattern in patients with severe carotid stenoses, were not sufficiently assessable as compared with DSA. We conclude that the possibility of obtaining simultaneously information about morphology and perfusion dynamics of the cervicocranial vessels is unique in MPRA as compared with other MR techniques. However, in the applied form, the technique is not a reliable tool for the complete evaluation of the cervicocranial vessels in patients with steno-occlusive disease. (orig.)

  12. General Electric Company proposed demonstration Projects Matrix, commercial buildings, National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The requirements for selecting commercial demonstrations are derived from the overall goal of the Federal program as stated in the ''National Program for Solar Heating and Cooling,'' ERDA 23-A, October 1975. This goal is to stimulate an industrial and commercial capability for producing and distributing solar heating and cooling (SHAC) systems. The development of the demonstration matrix consists of establishing selection criteria and developing a methodology for applying and evaluating these criteria. The output of this procedure results in a time phased matrix of location, SHAC systems, and building types which comprise the recommended National Solar Demonstration projects for commercial buildings. The Demonstration Matrix Definition is comprised of three principle elements: Demonstration identification; Specific Demonstration selection criteria; and Architect/Engineer (A/E) selection. (WDM)

  13. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  14. Evaluation of dredged material proposed for ocean disposal from Red Hook/Bay Ridge project areas, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Red HookIBay Ridge project was to evaluate proposed dredged material from these two areas to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Sediment samples were collected from the Red Hook/Bay Ridge project areas. Tests and analyses were conducted. The evaluation of proposed dredged material from the Red Hook/Bay Ridge project areas consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests. Twenty-four individual sediment core samples were collected from these two areas and analyzed for grain size, moisture content, and total organic carbon (TOC). Three composite sediment samples, representing Red Hook Channel and the two Bay Ridge Reaches to be dredged, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the three Red Hook Bay Ridge sediment composites, were analyzed for metals, pesticides, and PCBS. Benthic acute toxicity tests were performed. Water-column or SPP toxicity tests were performed. Bioaccumulation tests were also conducted.

  15. Economic Functions Proposal of Urgency Prioritization of Investment Projects of Operated Railway Bridges

    Directory of Open Access Journals (Sweden)

    Pitoňák Martin

    2014-12-01

    Full Text Available The main objective of the article is to describe the proposals of economic functions within the prioritization of urgency investments of operated railway bridges within a comprehensive evaluation of existing bridges. The purpose of the paper is a comprehensive assessment of existing bridges and to define determinants and determinants of decision-making and designing a mechanism of decision-making procedures of prioritized infrastructure measures in the form of repairs and reconstructions of bridges resulting from the records of supervising activities based not only on technical but also economic aspects to the railway infrastructure manager.

  16. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  17. Preliminary Conceptual Design Report for the FACET-II Project at SLAC National Accelerator Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, Mark [SLAC National Accelerator Lab., Menlo Park, CA (United States)

    2016-04-22

    Plasma wakefield acceleration has the potential to dramatically shrink the size and cost of particle accelerators. Research at the SLAC National Accelerator Laboratory has demonstrated that plasmas can provide 1,000 times the acceleration in a given distance compared with current technologies. Developing revolutionary and more efficient acceleration techniques that allow for an affordable high-energy collider is the focus of FACET, a National User Facility at SLAC. The existing FACET National User Facility uses part of SLAC’s two-mile-long linear accelerator to generate high-density beams of electrons and positrons. FACET-II is a new test facility to develop advanced acceleration and coherent radiation techniques with high-energy electron and positron beams. It is the only facility in the world with high energy positron beams. FACET-II provides a major upgrade over current FACET capabilities and the breadth of the potential research program makes it truly unique. It will synergistically pursue accelerator science that is vital to the future of both advanced acceleration techniques for High Energy Physics, ultra-high brightness beams for Basic Energy Science, and novel radiation sources for a wide variety of applications. The design parameters for FACET-II are set by the requirements of the plasma wakefield experimental program. To drive the plasma wakefield requires a high peak current, in excess of 10kA. To reach this peak current, the electron and positron design bunch size is 10μ by 10μ transversely with a bunch length of 10μ. This is more than 200 times better than what has been achieved at the existing FACET. The beam energy is 10 GeV, set by the Linac length available and the repetition rate is up to 30 Hz. The FACET-II project is scheduled to be constructed in three major stages. Components of the project discussed in detail include the following: electron injector, bunch compressors and linac, the positron system, the Sector 20 sailboat and W chicanes

  18. [Modular project of the Picture Archiving and Communication System (PACS). Preliminary operational experience. I].

    Science.gov (United States)

    Dalla Palma, L; Ukovich, W; Stacul, F; Cuttin Zernich, R; Carbi, N; Giribona, P

    1990-01-01

    Since september 1988 a PAC System (Comm View by AT & T and Philips) has been operating in the Radiology Department of the University Hospital, Trieste. A research project is presently in progress aiming at providing factual evidence for the evaluation of this kind of systems as far as operational, technical, clinical and economic aspects are concerned. The general approach to this research consists in implementing and monitoring a PACS in a stepwise way, starting with a small system connected to some digital modalities only, in order to test the feasibility and effectiveness of the system within a Radiology Department, and to test the possibility of matching the PACS to the Radiological System. The present paper describes in detail the present configuration of this entry-level system and its technical features. The planned development (october 1989) is also depicted. Further developments devise at managing in an integrated way all the radiological images of the four hospitals of Trieste. At present, the PACS is currently used to manage and store on optical disks all the images acquired from the connected modalities plus the related reports, and to perform the reporting sessions for CT examinations (brain and abdomen). The present research effort is devoted to two main areas: clinical evaluation and operational analysis. The object of the operational analysis was the assessment of the impact of PACS on the operations of a Radiology Department. The general approach followed for this research consists in analysing the procedures as they are performed in the conventional way (manual operations), and comparing them to the way they are, or could be, performed using a PACS System (automatic operations). This stage of the project is divided into three phases, concerning respectively the analysis of the organization and operations before PACS, the analysis of the impact of PACS in its initial configuration and the forecast of the influence of PACS in its future setting. A

  19. A Review of the Risk in Public Works Projects and Risk Assignment Associated with the Technical Proposals

    Science.gov (United States)

    Baba, Kazuhito; Miyatake, Ichiro; Kudo, Masataka; Yokoi, Hiroyuki; Fueta, Toshiharu

    By the enactment of the Bill for Ensuring the Quality of Public Works in 2005, which requires due consideration for the use of technical proposals, or iginality, and ingenuity of the private companies, as well as allows to cap estimates based on the results of evaluations of proposals involving advanced technologies, it becomes easier to request the technical proposals including the design of the structure. With this institutional arrangement, the Ministry of Land, Infrastructure, Transport and the Tourism (MLIT) tries the design-build method etc., in the aim of further utilizing the technical proposals of private companies. Although the design-build method allows a wider range of flexibility in proposals, there is a certain risk associated with this method, as it requires the tender price to be decided when the site condition is unclear. The risk was taken by the contractors when the design-build method was used on a trial basis, for the purpose of ensuring fair competitiveness. However, it was decided that the client shares the risk to some extent, after it was found that such risk assignment was not appropriate in some cases. In view of this background, this study examines the actual risk associated with the examples of public works projects, in the aim of providing basic information used in future discussions, as to how fair competitiveness shall be ensured, while the client shares some risk.

  20. Preliminary Assessment of JERS-1 SAR to Discriminating Boreal Landscape Features for the Boreal Forest Mapping Project

    Science.gov (United States)

    McDonald, Kyle; Williams, Cynthia; Podest, Erika; Chapman, Bruce

    1999-01-01

    This paper presents an overview of the JERS-1 North American Boreal Forest Mapping Project and a preliminary assessment of JERS-1 SAR imagery for application to discriminating features applicable to boreal landscape processes. The present focus of the JERS-1 North American Boreal Forest Mapping Project is the production of continental scale wintertime and summertime SAR mosaics of the North American boreal forest for distribution to the science community. As part of this effort, JERS-1 imagery has been collected over much of Alaska and Canada during the 1997-98 winter and 1998 summer seasons. To complete the mosaics, these data will be augmented with data collected during previous years. These data will be made available to the scientific community via CD ROM containing these and similar data sets compiled from companion studies of Asia and Europe. Regional landscape classification with SAR is important for the baseline information it will provide about distribution of woodlands, positions of treeline, current forest biomass, distribution of wetlands, and extent of major rivercourses. As well as setting the stage for longer term change detection, comparisons across several years provides additional baseline information about short-term landscape change. Rapid changes, including those driven by fire, permafrost heat balance, flooding, and insect outbreaks can dominate boreal systems. We examine JERS-1 imagery covering selected sites in Alaska and Canada to assess quality and applicability to such relevant ecological and hydrological issues. The data are generally of high quality and illustrate many potential applications. A texture-based classification scheme is applied to selected regions to assess the applicability of these data for distinguishing distribution of such landcover types as wetland, tundra, woodland and forested landscapes.

  1. S/sup 3/ Financial Projection Model: preliminary user's manual and system overview

    Energy Technology Data Exchange (ETDEWEB)

    Masso, J. F.

    1976-11-30

    The S/sup 3/ Financial Projection Model is an effort undertaken to construct a pipeline economic model in order to satisfy the requirements of the US ERDA program: Energy Study of Pipeline Transportation System. A brief outline of this process is described in Appendix A, Background on the S/sup 3/ Development of a Pipeline Economic Model. A general overview of the model is presented first to indicate the rationale underlying the model and to show the linkages between the various submodels. An understanding of the basic accounting definitions and self-evident relationships between line items in the general financial accounting reports is a prerequisite for the effective application of the model. Particular attention has been paid in this system description to defining the methods of calculations utilized by the model and to describing the optional capital investment planning techniques that may be exercised with the model. The mathematical relationships underlying various planning techniques are defined and the methods for applying these techniques are discussed with illustrations and sample input data specifications. Decision tables are used to show complex decision rules applied within the model to determine the logical flow of a particular computational routine. The complete set of source data and model options are described along with the procedures for input data preparation and actual program operation.

  2. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  3. Does Education Plus Action Lead to Leadership on Climate? Preliminary Results from the ACE Leadership Development Longitudinal Survey Project

    Science.gov (United States)

    Anderson, R. K.; Qusba, L.; Lappe, M.; Flora, J. A.

    2014-12-01

    Through education and leadership development, Alliance for Climate Education (ACE) is building a generation of confident and capable youth driving climate solutions now throughout their lives. In 2011-12, a random sample of 2,800 high school students across the country was surveyed before and after seeing the ACE Assembly on climate science and solutions. The survey showed that the ACE Assembly resulted in a 27% increase in climate science knowledge scores, with 59% of students increasing their intentions to take action on climate and a doubling of the number of students talking to parents and peers about climate change. Students were also compared to the Global Warming's Six Americas classification of Americans' views on climate. Following the ACE Assembly, 60% of students were alarmed or concerned about climate change. Building off these results, in 2014 ACE began to assess the results of its leadership development program that follows the ACE Assembly. The goal of this survey project is to measure ACE's long-term impact on students' college and career pathways, civic engagement and climate action. Preliminary results show that a majority of students in ACE's leadership development program are alarmed about global warming and are having conversations about global warming. A majority of these students also feel confident in their ability to lead a climate-related campaign in their school and community. These students will continue to be surveyed through 2015.

  4. ``In vivo'' Dose Measurements in High-Dose-Rate Brachytherapy Treatments for Cervical Cancer: A Project Proposal

    Science.gov (United States)

    Mejía, C. A. Reynoso; Burgos, A. E. Buenfil; Trejo, C. Ruiz; García, A. Mota; Durán, E. Trejo; Ponce, M. Rodríguez; de Buen, I. Gamboa

    2010-12-01

    The aim of this thesis project is to compare doses calculated from the treatment planning system using computed tomography images, with those measured "in vivo" by using thermoluminescent dosimeters placed at different regions of the rectum and bladder of a patient during high-dose-rate intracavitary brachytherapy treatment of uterine cervical carcinoma. The experimental dosimeters characterisation and calibration have concluded and the protocol to carry out the "in vivo" measurements has been established. In this work, the calibration curves of two types of thermoluminescent dosimeters (rods and chips) are presented, and the proposed protocol to measure the "in vivo" dose is fully described.

  5. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  6. Patient Perceptions of Participating in the RSNA Image Share Project: a Preliminary Study.

    Science.gov (United States)

    Hiremath, Atheeth; Awan, Omer; Mendelson, David; Siegel, Eliot L

    2016-04-01

    The purpose of this study was to gauge patient perceptions of the RSNA Image Share Project (ISP), a pilot program that provides patients access to their imaging studies online via secure Personal Health Record (PHR) accounts. Two separate Institutional Review Board exempted surveys were distributed to patients depending on whether they decided to enroll or opt out of enrollment in the ISP. For patients that enrolled, a survey gauged baseline computer usage, perceptions of online access to images through the ISP, effect of patient access to images on patient-physician relationships, and interest in alternative use of images. The other survey documented the age and reasons for declining participation for those that opted out of enrolling in the ISP. Out of 564 patients, 470 enrolled in the ISP (83 % participation rate) and 456 of these 470 individuals completed the survey for a survey participation rate of 97 %. Patients who enrolled overwhelmingly perceived access to online images as beneficial and felt it bolstered their patient-physician relationship. Out of 564 patients, 94 declined enrollment in the ISP and all 94 individuals completed the survey for a survey participation rate of 100 %. Patients who declined to participate in the ISP cited unreliable access to Internet and existing availability of non-web-based intra-network images to their physicians. Patients who participated in the ISP found having a measure of control over their images to be beneficial and felt that patient-physician relationships could be negatively affected by challenges related to image accessibility.

  7. The Interactive Virtual Earth Science Teaching (InVEST) project: preliminary results

    Science.gov (United States)

    Gallus, W.; Cervato, C.; Parham, T.; Larsen, M.; Cruz-Neira, C.; Boudreaux, H.

    2009-04-01

    The InVEST (Interactive Virtual Earth Science Teaching) project has as its goal the development of state-of-the-art virtual reality geoscience tools that can be used to correct student misunderstandings about some geoscience phenomena. One tool, originally developed several years ago, the virtual tornadic thunderstorm, was recently modified based on feedback from instructors given the opportunity to use the tool. The modified virtual storm will be demonstrated during the presentation. In addition, a virtual volcano application is currently under development. To steer the development of this application, a Volcanic Concept Survey was recently administered to over 600 students at six U.S. institutions with the goal of identifying areas of greatest misconception relating to volcanoes. Both mean and median scores on the instrument were exceptionally low, indicating that students generally possessed minimal understanding of volcanic systems. High scores were restricted to the simplest aspects of volcanism (terminology, basic volcano shape) while questions requiring higher thinking and deeper conceptual connections (analysis of patterns, eruptive controls, and hazards) saw much lower scores. Categorical analysis of response types revealed the extent of specific misconceptions, the most predominant of which demonstrated a failure to link tectonics to a global volcanic pattern. Eruptive catalysts and controls also appear poorly understood, as are volcanic impacts on the environment and human endeavors. The survey also included demographic information which has been analyzed. Analysis of student sources of knowledge found that over 41% of students said that they had acquired most of their understanding about volcanoes from non-traditional sources such as the popular media and Hollywood films. Application of a multiple linear regression model and an expanded model suggests that these students were much less likely to receive high scores on questions relating to understanding

  8. Relocation of hypocenters from DOMERAPI and BMKG networks: a preliminary result from DOMERAPI project

    Science.gov (United States)

    Ramdhan, Mohamad; Widiyantoro, Sri; Nugraha, Andri Dian; Métaxian, Jean-Philippe; Saepuloh, Asep; Kristyawan, Said; Sembiring, Andry Syaly; Santoso, Agus Budi; Laurin, Antoine; Fahmi, Ahmad Ali

    2017-04-01

    Merapi volcano located in central Java, Indonesia, is one of the most active stratovolcanoes in the world. Many Earth scientists have conducted studies on this volcano using various methods. The geological features around Merapi are very attractive to be investigated because they have been formed by a complex tectonic process and volcanic activities since tens of millions of years ago. The southern mountain range, Kendeng basin and Opak active fault located around the study area resulted from these processes. DOMERAPI project was conducted to understand deep magma sources of the Merapi volcano comprehensively. The DOMERAPI network was running from October 2013 to mid-April 2015 by deploying 46 broad-band seismometers around the volcano. Several steps, i.e., earthquake event identification, arrival time picking of P and S waves, hypocenter determination and hypocenter relocation, were carried out in this study. We used Geiger's method (Geiger 1912) for hypocenter determination and double-difference method for hypocenter relocation. The relocation result will be used to carry out seismic tomographic imaging of structures beneath the Merapi volcano and its surroundings. For the hypocenter determination, the DOMERAPI data were processed simultaneously with those from the Agency for Meteorology, Climatology and Geophysics (BMKG) seismic network in order to minimize the azimuthal gap. We found that the majority of earthquakes occurred outside the DOMERAPI network. There are 464 and 399 earthquakes obtained before and after hypocenter relocation, respectively. The hypocenter relocation result successfully detects some tectonic features, such as a nearly vertical cluster of events indicating a subduction-related backthrust to the south of central Java and a cluster of events to the east of Opak fault suggesting that the fault has an eastward dip.

  9. Preliminary Hazard Analysis for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; Mike Lehto

    2010-10-01

    The need for remote handled low level waste (LLW) disposal capability has been identified. A new onsite, remote-handled LLW disposal facility has been identified as the highest ranked alternative for providing continued, uninterrupted remote-handled LLW disposal capability for remote-handled LLW that is generated as part of the nuclear mission of the Idaho National Laboratory and from spent nuclear fuel processing activities at the Naval Reactors Facility. Historically, this type of waste has been disposed of at the Radioactive Waste Management Complex. Disposal of remote-handled LLW in concrete disposal vaults at the Radioactive Waste Management Complex will continue until the facility is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). This document supports the conceptual design for the proposed remote-handled LLW disposal facility by providing an initial nuclear facility hazard categorization and by identifying potential hazards for processes associated with onsite handling and disposal of remote-handled LLW.

  10. The Cognitive Behavioral Assessment (CBA Project: Presentation and Proposal for International Collaboration

    Directory of Open Access Journals (Sweden)

    Ezio Sanavio

    2013-11-01

    Full Text Available Aims: The main aim of this paper is to describe almost 30 years of work on psychological assessment using CBA, a research team, and to propose collaboration with Latin countries. Methods: The acronym CBA stands for Cognitive Behavioural Assessment and indicates both an overall approach to clinical assessment and a series of tests. Five general principles formed the basis on which the team developed their questionnaires: (1 assessment is not a passive collection of information, but an active process similar to problem-solving; (2 horizontal integration of questionnaires with other assessment methods; (3 vertical integration and hierarchical structure of assessment questionnaires; (4 idiographic perspective; (5 computer support. Results: The paper briefly presents the most important tests: CBA-2.0, a broad-spectrum Battery for patients who need counselling and/or psychotherapy; CBA-H (Hospital for both in-patients and out-patients suffering from physical illnesses; CBA-SPORT for professional athletes; CBA-Y (young people for adolescents and young adults; CBD-VE (treatment benefits to assess the effectiveness of psychological treatment. Conclusion: These questionnaires have produced over 100 research works, published in Italian journals or presented in conferences. In the near future, we expect important, radical changes and hope to create an international research milieu.

  11. Does Library Use Affect Student Attainment? A Preliminary Report on the Library Impact Data Project

    Directory of Open Access Journals (Sweden)

    Graham Stone

    2011-10-01

    . This paper will report on the initial findings of the project and whether the measurable targets have been achieved: Sufficient data are successfully captured from all partners; Statistical significance is proved for all data; The hypothesis is either wholly or partly proved for each data type and partner.

  12. Preliminary analysis of downhole logging data from ICDP Lake Junin drilling Project, Peru

    Science.gov (United States)

    Pierdominici, Simona; Kück, Jochem; Rodbell, Donald T.; Abbott, Mark B.

    2016-04-01

    The International Continental Drilling Programm (ICDP) has supported a scientific drilling campaign in Peru during the summer season 2015. The Lake Junin Drilling Project mainly aims at obtaining high-resolution paleoclimate records from lacustrine sediments to reconstruct the history of the continental records covering the glacial-interglacial cycles. Lake Junín is located at 4000 m a.s.l. in the tropical Andes of Peru, and is characterized by a thick (> 125 m) sediment package deposited at a high rate (0.2 to 1.0 mm yr-1). Lake Junín is one of the few lakes in the tropical Andes that predates the maximum extent of glaciation and is in a geomorphic position to record the waxing and waning of glaciers in nearby cordillera, hence making the lake a key site for the investigation of the Quaternary climate evolution in the inner-tropics of the Southern Hemisphere. Continous coring was performed at three sites in overall 11 boreholes on the lake with at least two overlapping boreholes per site to avoid core gaps. The depth of the boreholes varied between approx. 30 m and 110 m depending on the drill site. The core bit had a bit size of 122.6 mm and yielded a core diameter of 85 mm. Upon completion of coring operations downhole geophysical logging was performed in five of the 11 boreholes (1A, 1C, 1D, 2A and 3B) by the Operational Support Group of ICDP. The main objective was to record in-situ the physical properties of the lacustrine sediments of Lake Junin. Downhole logs provide a powerful tool to fill in information at intervals with core gaps and as depth reference for depth matching of the discontinous cores. Furthermore it will be used for the lithological reconstruction and interpretation. The OSG downhole logging comprised total and spectrum gamma ray, magnetic susceptibility, borehole geometry, temperature, and sonic P-wave velocity. Unstable and collapsing borehole walls made it neccessary to carry out logging in several sections instead of in one run. The

  13. 谈建筑安装工程前期策划%Discussion on the preliminary planning of construction and installation project

    Institute of Scientific and Technical Information of China (English)

    李芳

    2014-01-01

    主要从建筑安装承包方的角度,阐述了在建筑安装工程项目实施全过程中进行前期策划的重要性和必要性,对策划的方法与重点内容进行了详细的说明,促使建筑安装工程前期策划更为科学合理。%Mainly from the angle of construction installation contractor, this paper elaborated the importance and necessity of preliminary plan-ning in construction and installation engineering project implementation process, explained in detail the planning methods and important con-tents, promoted the preliminary planning more scientific and reasonable of construction and installation project.

  14. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    Energy Technology Data Exchange (ETDEWEB)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in the following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.

  15. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the "Thought in Mind" Project.

    Science.gov (United States)

    Valle, Annalisa; Massaro, Davide; Castelli, Ilaria; Sangiuliano Intra, Francesca; Lombardi, Elisabetta; Bracaglia, Edoardo; Marchetti, Antonella

    2016-01-01

    Mentalization research focuses on different aspects of this topic, highlighting individual differences in mentalizing and proposing programs of intervention for children and adults to increase this ability. The "Thought in Mind Project" (TiM Project) provides training targeted to adults-teachers or parents-to increase their mentalization and, consequently, to obtain mentalization improvement in children. The present research aimed to explore for the first time ever the potential of training for teachers based on the TiM Project, regarding the enhancement of mentalizing of an adult who would have interacted as a teacher with children. For this reason, two teachers - similar for meta-cognitive and meta-emotional skills - and their classes (N = 46) were randomly assigned to the training or control condition. In the first case, the teacher participated in training on the implementation of promotion of mentalizing in everyday school teaching strategies; in the second case the teacher participated in a control activity, similar to training for scheduling and methods, but without promoting the implementation of mentalization (in both conditions two meetings lasting about 3 h at the beginning of the school year and two supervisions during the school year were conducted). The children were tested by tasks assessing several aspects of mentalization (second and third-order false belief understanding, Strange Stories, Reading the mind in the Eyes, Mentalizing Task) both before and after the teacher participate in the TiM or control training (i.e., at the beginning and at the end of the school year). The results showed that, although some measured components of mentalization progressed over time, only the TiM Project training group significantly improved in third order false belief understanding and changed - in a greater way compared to the control group - in two of the three components of the Mentalizing Task. These evidences are promising about the idea that the creation of

  16. Preliminary Planning and Process Control of Railway Engineering Project%浅谈铁路工程项目前期策划及过程控制

    Institute of Scientific and Technical Information of China (English)

    刘佰川

    2016-01-01

    在铁路项目建设的整个周期,如何能保持或达到策划测算的经济目标,如何实施项目全过程控制,使项目施工全过程在预定的轨道上运行,项目的前期策划及过程控制就显得尤为重要。%In the whole cycle of railway construction projects, how to maintain or achieve the economic targets and implement the project whole process control to make the whole process of the project construction in the scheduled track running, the preliminary planning and process control of the project are particularly important.

  17. Project Icarus: Preliminary Thoughts on the Selection of Probes and Instruments for an Icarus-style Interstellar Mission

    Science.gov (United States)

    Crawford, Ian A.

    2016-06-01

    In this paper we outline the range of probes and scientific instruments that will be required in order for Icarus to fulfill its scientific mission of exploring a nearby star, its attendant planetary system, and the intervening interstellar medium. Based on this preliminary analysis, we estimate that the minimum total Icarus scientific payload mass (i.e. the mass of probes and instruments which must be decelerated to rest in the target system to enable a meaningful programme of scientific investigation) will be in the region of 100 tonnes. Of this, approximately 10 tonnes would be allocated for cruise-phase science instruments, and about 35 tonnes (i.e. the average of estimated lower and upper limits of 28 and 41 tonnes) would be contributed by the intra-system science payload itself (i.e. the dry mass of the stellar and planetary probes and their instruments). The remaining ~55 tonnes is allocated for the sub-probe intra-system propulsion requirements (crudely estimated from current Solar System missions; detailed modelling of sub-probe propulsion systems will be needed to refine this figure). The overall mass contributed by the science payload to the total that must be decelerated from the interstellar cruise velocity will be considerably more than 100 tonnes, however, as allowance must be made for the payload structural and infrastructural elements required to support, deploy, and communicate with the science probes and instruments. Based on the earlier Daedalus study, we estimate another factor of two to allow for these components. Pending the outcome of more detailed studies, it therefore appears that an overall science-related payload mass of ~200 tonnes will be required. This paper is a submission of the Project Icarus Study Group.

  18. Airborne pollutant concentrations and health risks in selected Apulia region (IT) areas: preliminary results from the Jonico-Salentino project

    Science.gov (United States)

    Buccolieri, Riccardo; Genga, Alessandra; De Donno, Antonella; Siciliano, Tiziana; Siciliano, Maria; Serio, Francesca; Grassi, Tiziana; Rispoli, Gennaro; Cavaiola, Mattia; Lionello, Piero

    2017-04-01

    The Jonico-Salentino project (PJS) is a multidisciplinary study funded by Apulia Region (Det. N. 188_RU - 10/11/2015) aiming to assess health risk of people living in the cities of Lecce, Brindisi and Taranto. Citizens are exposed to emissions from industrial sources, biomass burning, vehicular, naval and air traffic, as well as from natural radioactive sources (radon). In this context, this work presents some preliminary results obtained by the Unit of University of Salento (Lecce) during an experimental campaign carried out in the study areas. The campaign is devoted to (i) sample particulate matter (PM), (ii) measure micro-meteorological variables and (iii) evaluate exposure levels of residents to main pollutants. Specifically, PM is sampled using a low volume sampler, while meteorological variables (wind speed components and direction temperature, relative humidity, precipitation and global solar radiation) are measured by advanced instrumentation such as ultrasonic anemometers which allows for the estimation of turbulence fluxes. The early effects of exposure to air pollutants is evaluated by the frequency of micronucleus (a biomarker of DNA damage) in exfoliated buccal cells collected using a soft-bristled toothbrush from oral mucosa of primary school children enrolled in the study. PM concentration data collected during the campaign are characterised from a chemical and morphological point of view; the analysis of different groups of particles allows identifying different natural and anthropogenic emission sources. This is done in conjunction to the investigation of the influence of local meteorology to elucidate the contribution of specific types of sources on final concentration levels. Finally, all data are used to assess the health risk of people living in the study areas as consequence of exposure to airborne pollutants.

  19. Probabilistic tsunami hazard assessment for the coasts of Italy: preliminary results in the frame of the RITMARE Project

    Science.gov (United States)

    Armigliato, Alberto; Tinti, Stefano; Pagnoni, Gianluca; Zaniboni, Filippo; Bressan, Lidia

    2013-04-01

    The five-year project called RITMARE ("La Ricerca ITaliana per il MARE") is a very ambitious national research and innovation program focussed on all aspects relevant to marine and coastal research, technology and management, with emphasis on networking and international cooperation. The program objectives fit into the overall European Commission vision documents and strategic programs and cover five major themes, one of which deals with technologies for the sustainable management of the coastal areas. The theme is further articulated in work-packages and specific actions, including the systematic and quantitative tsunami hazard assessment for the whole Italian coastlines. The University of Bologna takes part in the project RITMARE, being a member of the University Consortium Conisma, that is a direct partner in the project. We present here some preliminary results obtained by the Tsunami Research Team of the University of Bologna (TRT-UNIBO) by applying a modified version of a hybrid statistical-deterministic approach to the southern Tyrrhenian, Ionian and Adriatic coasts. A widely adopted approach formulates the problem of the tsunami hazard assessment in terms of the probability of occurrence of tsunamigenic earthquakes, which is appropriate in basins where the number of known historical tsunamis is too scarce to be used in reliable statistical analyses, and where the largest part of tsunamis have tectonic origin. The TRT-UNIBO approach starts by building a single homogeneous earthquake catalogue covering the whole national territory, as well as the adjacent areas that are believed to have the potential to produce tsunamis with relevant far-field effects along the Italian coasts. A proper statistical analysis of the catalogue allows retrieving the earthquake occurrence rate at a regional scale as well as in a set of cells in which the studied geographical domain is divided into. The final result of the statistical analysis is the computation for each cell of the

  20. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the “Thought in Mind” Project

    Science.gov (United States)

    Valle, Annalisa; Massaro, Davide; Castelli, Ilaria; Sangiuliano Intra, Francesca; Lombardi, Elisabetta; Bracaglia, Edoardo; Marchetti, Antonella

    2016-01-01

    Mentalization research focuses on different aspects of this topic, highlighting individual differences in mentalizing and proposing programs of intervention for children and adults to increase this ability. The “Thought in Mind Project” (TiM Project) provides training targeted to adults—teachers or parents—to increase their mentalization and, consequently, to obtain mentalization improvement in children. The present research aimed to explore for the first time ever the potential of training for teachers based on the TiM Project, regarding the enhancement of mentalizing of an adult who would have interacted as a teacher with children. For this reason, two teachers – similar for meta-cognitive and meta-emotional skills - and their classes (N = 46) were randomly assigned to the training or control condition. In the first case, the teacher participated in training on the implementation of promotion of mentalizing in everyday school teaching strategies; in the second case the teacher participated in a control activity, similar to training for scheduling and methods, but without promoting the implementation of mentalization (in both conditions two meetings lasting about 3 h at the beginning of the school year and two supervisions during the school year were conducted). The children were tested by tasks assessing several aspects of mentalization (second and third-order false belief understanding, Strange Stories, Reading the mind in the Eyes, Mentalizing Task) both before and after the teacher participate in the TiM or control training (i.e., at the beginning and at the end of the school year). The results showed that, although some measured components of mentalization progressed over time, only the TiM Project training group significantly improved in third order false belief understanding and changed - in a greater way compared to the control group – in two of the three components of the Mentalizing Task. These evidences are promising about the idea that the

  1. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the "Thought in Mind" Project

    Directory of Open Access Journals (Sweden)

    Annalisa Valle

    2016-08-01

    Full Text Available Mentalization research focuses on different aspects of this topic, highlighting individual differences in mentalizing and proposing programs of intervention for children and adults to increase this ability. The Thought in Mind Project (TiM Project provides training targeted to adults―teachers or parents―to increase their mentalization and, consequently, to obtain mentalization improvement in children. The present research aimed to explore for the first time ever the potential of training for teachers based on the TiM Project, regarding the enhancement of mentalizing of an adult who would have interacted as a teacher with children. For this reason, two teachers – similar for meta-cognitive and meta-emotional skills - and their classes (N=46 were randomly assigned to the training or control condition. In the first case, the teacher participated in training on the implementation of promotion of mentalizing in everyday school teaching strategies; in the second case the teacher participated in a control activity, similar to training for scheduling and methods, but without promoting the implementation of mentalization (in both conditions two meetings lasting about three hours at the beginning of the school year and two supervisions during the school year were conducted. The children were tested by tasks assessing several aspects of mentalization (2nd and 3rd order false belief understanding, Strange Stories, Reading the mind in the Eyes, Mentalizing Task both before and after the teacher participate in the TiM or control training (i.e. at the beginning and at the end of the school year. The results showed that, although some measured components of mentalization progressed over time, only the TiM training group significantly improved in 3rd order false belief understanding and changed - in a greater way compared to the control group - in two of the three components of the Mentalizing Task. These evidences are promising about the idea that the

  2. 76 FR 21891 - Seneca Nation of Indians; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-04-19

    ... Energy Regulatory Commission Seneca Nation of Indians; Notice of Preliminary Permit Application Accepted..., 2011, the Seneca Nation of Indians filed an application for a preliminary permit, pursuant to section 4... owners' express permission. The Seneca Nation of Indians proposed project would consist of the...

  3. 75 FR 22579 - Bishop Paiute Tribe; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-04-29

    ... Energy Regulatory Commission Bishop Paiute Tribe; Notice of Competing Preliminary Permit Application... Bishop Paiute Tribe filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Bishop Paiute Hydroelectric Project...

  4. 77 FR 27767 - Milford Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-05-11

    ... Energy Regulatory Commission Milford Hydro, LLC; Notice of Preliminary Permit Application Accepted for..., Milford Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Milford Dam Hydroelectric Project, which would be...

  5. The Bioinformatics of Integrative Medical Insights: Proposals for an International PsychoSocial and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International PsychoSocial and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  6. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field.

  7. [Proposal and preliminary validation of a check-list for the assessment of occupational exposure to repetitive movements of the upper lims].

    Science.gov (United States)

    Colombini, D; Occhipinti, E; Cairoli, S; Baracco, A

    2000-01-01

    Over the last few years the Authors developed and implemented, a specific check-list for a "rapid" assessment of occupational exposure to repetitive movements and exertion of the upper limbs, after verifying the lack of such a tool which also had to be coherent with the latest data in the specialized literature. The check-list model and the relevant application procedures are presented and discussed. The check-list was applied by trained factory technicians in 46 different working tasks where the OCRA method previously proposed by the Authors was also applied by independent observers. Since 46 pairs of observation data were available (OCRA index and check-list score) it was possible to verify, via parametric and nonparametric statistical tests, the level of association between the two variables and to find the best simple regression function (exponential in this case) of the OCRA index from the check-list score. By means of this function, which was highly significant (R2 = 0.98, p check-list score which better corresponded to the critical values (for exposure assessment) of the OCRA index looked for. The following correspondance values between OCRA Index and check-list were then established with a view to classifying exposure levels. The check-list "critical" scores were established considering the need for obtaining, in borderline cases, a potential effect of overestimation of the exposure level. On the basis of practical application experience and the preliminary validation results, recommendations are made and the caution needed in the use of the check-list is suggested.

  8. The flora and fauna of a proposed wind turbine site near Royal Road, Prince Edward County, Ontario : preliminary screening of the natural environment

    Energy Technology Data Exchange (ETDEWEB)

    Holder, M.; Leggett, A. [Jacques Whitford Environment Ltd., Markham, ON (Canada)

    2002-07-15

    Calgary based Vision Quest Windelectric has been given zoning approval to install a 22 MW windfarm in Ontario's Prince Edward County. Following a preliminary screening to determine the effect of the windfarm on the natural environment, the Royal Road Windfarm will be developed in stages with up to 32 turbines. Jacques Whitford Environment Ltd. conducted an environmental study which showed that an exploratory wind turbine in the area is not likely to cause major adverse impacts on local fauna and flora. The proposed location of the wind turbine is not in an important bird area (IBA). An IBA is defined as a site providing essential habitat for one of more species of breeding or non-breeding birds. In 1999, Vision Quest initiated a program to examine bird interactions with wind turbines in southern Alberta. It was shown that most species choose flight paths to avoid turbines. The Royal Road site hosts rare alvars which are naturally open landscapes found in shallow soils on flat limestones. The alvars are subject to seasonal drought and flooding and have specific types of vegetation and animals. Since the exploratory wind turbine will be placed outside the IBA area, its impact on birds will be minimized, and it will have minimal effect on migrant, breeding and wintering birds. It was recommended that monitoring take place at the site during the first year of operation. It is also presumed that the wind turbine will not have any impact on mammals, reptiles and amphibians, or insects. However, it was recommended that more information be gathered on bat movement in the area. If placed appropriately, the wind turbine is not expected to impact on rare plants. It was emphasized that in the past, Vision Quest Windelectric has conducted environmental screening activities, and has acted on recommendations to place wind turbines in locations where environmental impact will be minimized. 26 refs., 5 tabs., 2 figs., 2 appendices.

  9. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing... Project No. 14188-000 and FFP Project 59, LLC for Project No. 14200-000. \\1\\ Under the Commission's...

  10. 77 FR 9232 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing... Project No. 14187-000 and FFP Project 58, LLC for Project No. 14199-000. \\1\\ Under the Commission's...

  11. 77 FR 9230 - Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing... Project No. 14178-000, and FFP Project 52, LLC for Project No. 14190-000. \\1\\ Under the Commission's...

  12. Surveying the Alentejo continental shelf for minerals and Quaternary environmental changes: preliminary results of the MINEPLAT project survey

    Science.gov (United States)

    Noiva, João; Ribeiro, Carlos; Terrinha, Pedro; Brito, Pedro; Neres, Marta

    2017-04-01

    assessment of good quality sand deposits between approximately 30m and 50m below sea level aims at minimizing this problem that affects the economy of littoral of Alentejo. The MINEPLAT project (Assessment of the mineral resources potential in the continental shelf of Alentejo and of the environmental conditions caused by the tectonic uplift in the Pliocene-Quaternary) aims at assessing the existence of mineral deposits off the Alentejo. The MINEPLAT-1 geophysical survey acquired very high resolution multi-channel reflection seismics, swath bathymetry, backscatter and magnetic data in a test area. The preliminary results show: previously unknown NNW-SSE aligned magnetic anomalies, possibly corresponding to buried Late Cretaceous alkaline rocks; faults affecting recent sediments; well defined patches of sediments associated to morphologic traps. Future work will involve ground-truthing to characterize the shallow deposits. Acknowledgement: This work was funded by Alentejo 2020 contract ALT20-03-0145-FEDER-000013

  13. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-29

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

  14. Management Measures Analysis of Preliminary Work of Chaoyang Ring Highway Project%朝阳环城公路项目前期工作管理措施分析

    Institute of Scientific and Technical Information of China (English)

    张建勋

    2012-01-01

    根据朝阳环城公路项目建设的工作实践,总结了项目前期审批和征地拆迁工作。%According to work practice of Chaoyang ring highway project construction, preliminary approval and land requisition and demolishing of the project are summarized.

  15. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the "Thought in Mind" Project

    National Research Council Canada - National Science Library

    Valle, Annalisa; Massaro, Davide; Castelli, Ilaria; Sangiuliano Intra, Francesca; Lombardi, Elisabetta; Bracaglia, Edoardo; Marchetti, Antonella

    2016-01-01

    .... The "Thought in Mind Project" (TiM Project) provides training targeted to adults-teachers or parents-to increase their mentalization and, consequently, to obtain mentalization improvement in children...

  16. 建设工程项目工程造价前期控制%Preliminary Control of the Project Cost of Construction Engineering

    Institute of Scientific and Technical Information of China (English)

    昝文枭

    2016-01-01

    The engineering cost is the cost in the process of project construction. Engineering construction mainly includes investment decision-making stage, design stage, construction project contract stage and construction project implementation stage. The atages before the project implementation are considered to be the early stage of the project. In the cost control of the project investment, people often only pay attention to the construction stage, but neglecte the preliminary control, it causes serious mistakes in cost management. So this paper analyzes the cost control of project decision-making and design stages to provide the reference for relevant personnel in the project cost.%工程造价是工程项目建设过程中的全部费用.工程建设主要包括投资决策阶段、设计阶段、建设项目发包阶段和建设实施阶段,工程实施之前均视为工程项目的前期阶段.在工程造价的投资控制中,人们往往只注重于施工阶段,却忽视了前期控制,造成造价管理上的重大失误.所以本文就针对项目决策和设计阶段造价控制予以分析,为有关人员在工程造价中提供借鉴.

  17. 77 FR 9232 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing... and FFP Project 57, LLC for Project No. 14197-000. \\1\\ Under the Commission's Rules of Practice...

  18. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing... applications were filed by Riverbank Hydro No. 22, LLC for Project No. 14269-000, and FFP Project 93, LLC...

  19. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing.... 14189-000 and FFP Project 56, LLC for Project No. 14198-000. \\1\\ Under the Commission's Rules...

  20. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing... No. 14185-000 and FFP Project 55, LLC for Project No. 14196-000. \\1\\ Under the Commission's Rules...

  1. 77 FR 9915 - Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing... and FFP Project 51, LLC for Project No. 14194-000. \\1\\ Under the Commission's Rules of Practice...

  2. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing... FFP Project 99, LLC for Project No. 14301-000.\\2\\ \\1\\ Under the Commission's Rules of Practice...

  3. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing.... 14181-000, and FFP Project 53, LLC for Project No. 14195-000. \\1\\ Under the Commission's Rules...

  4. 77 FR 12281 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing.... 14185-000 and FFP Project 55, LLC for Project No. 14196-000. \\1\\ Under the Commission's Rules...

  5. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing... and FFP Project 2, LLC for Project No. 14193-000. \\1\\ Under the Commission's Rules of Practice...

  6. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing...-000 and FFP Project 1, LLC for Project No. 14191-000. \\1\\ Under the Commission's Rules of Practice...

  7. 78 FR 2423 - Draft Environmental Impact Statement (DEIS) for the Proposed Shu'luuk Wind Project on the Campo...

    Science.gov (United States)

    2013-01-11

    ... 160 MW from wind) in combination with up to 40 1-MW solar photovoltaic (PV) panels (totaling 40 MW..., California. The lease area would be up to 900 acres, based on final project design, which is dependent upon.... The project would ] be a wind energy project with one alternative that may include some solar energy...

  8. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  9. Methane Hydrate and Gas In The Continental Margin of West Svalbard - Preliminary Results of The Hydratech Project

    Science.gov (United States)

    Westbrook, G. K.; Hydratech Consortium

    In July 2001, two sites in the continental margin west of Svalbard were the subject of seismic investigation as part of the EC-FP5-EESD project HYDRATECH - Tech- niques for the Quantification of Methane Hydrate in European Continental Margins. The northern of the two sites, is underlain by a bottom-simulating reflector (BSR), be- lieved to mark the downward transition from sediment containing hydrate to sediment containing free gas [Posewang &Mienert, Geo-Marine Letters, 19, 150-156, 1999]. At the southern site, bright spots, associated with a decrease in seismic velocity, occur above active mud diapirs that intrude a local basin near the foot of the continental margin. At each site, an array of 20 four-component OBS at 400-m spacing was de- ployed at the centre of a grid of seismic lines shot with 200-m line spacing and a 20-m shot spacing. The seismic source comprised two 0.65-litre sleeve guns, and single- channel reflection profiles were recorded along each shot line. At the northern site, a BSR is seen in most of the reflection profiles, at a depth of about 250 ms below the sea bed. It has opposite polarity to the seabed reflector, and obliquely cuts across the reflectors related to bedding, which show increased amplitude and lower frequency content beneath the BSR. Some of these reflectors show a change in polarity where they cross the BSR. Generally, the BSR is a reflector that exists independently of the other reflectors, at the scale of the seismic resolution of the profiles, although in parts of the profiles the hydrate/gas transition is only evident from the change in amplitude of the bedding reflectors. A preliminary inversion of the travel-time data recorded by one OBS from one shot line shows that P-wave velocity increases steadily with depth to 1800 m/s at the BSR, at a depth of 205 m, beneath which the velocity decreases rapidly to about 1460 m/s. This zone of low velocity, about 50-m thick, beneath the BSR is interpreted to be caused by the

  10. 浅谈水电项目前期工作管理%The Management of Preliminary Work of Hydropower Project

    Institute of Scientific and Technical Information of China (English)

    李俊华

    2013-01-01

      水电项目前期工作对工程的实施起着基础性作用,必须在设计论证、移民安置、合同管理方面扎实做好工作才能为主体工程的顺利建设打下坚实基础。%The preliminary work of hydropower project plays a fundamental role on the implementation of the project. It must be done well in the following aspects: the design argument, resettlement of inhabitant, the contract management etc., so as to lay a solid foundation for the smooth construction of the main work.

  11. Small-scale hydro power in the Anniviers Valley. Project Ayer-Nava. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Ayer-Nava. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant near Ayer, a village in the Anniviers Valley (Swiss Alps). Water from the Nava, a steep mountain river, should be lead into a hydraulic scheme for power generation. A hydraulic head of 400 to 550 m is available, depending on the variant considered. The corresponding expected mechanical power is 0.9 to 1.1 MW. For the most promising variant a preliminary project is described (peak electric power: 0.91 MW, annual electrical energy production: 3.1 GWh). The local geology and hydrogeology are presented. The water collection points, conduits and the power station are described. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  12. 浅论稳步推进水利工程移民安置前期工作%On Steady Promotion of Water Conservancy Project Immigrant Preliminary Resettlement Work

    Institute of Scientific and Technical Information of China (English)

    杨在华

    2013-01-01

      The preliminary work of resettlement is an important part of water conservancy project preliminary work , and it is related to the smooth project establishment , approval and construction of water conservancy project .It is also related to long-term stability of reservoir area and the resettlement area .The paper analyzes and describes the preliminary work of settlement in water conservancy project , thereby steadily promoting resettlement preliminary work of water conservancy project, and improving the quality of preliminary work .%  移民安置前期工作是水利工程前期工作的重要组成部分,事关水利工程顺利立项、审批、建设,以及库区和移民安置区的长治久安。本文对水利工程移民安置前期工作进行了分析阐述,以利稳步推进水利工程移民安置前期工作,提高前期工作质量。

  13. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  14. Small-scale hydro power in the Anniviers Valley. Project Chippis-Ricard. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Chippis-Ricard. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant in Chippis, Switzerland. The project takes advantage of an existing irrigation scheme that deviates water from the Navisence River into two successive tunnels (total 1.8 km) and a following channel built on steep mountain sides. The basic idea of the project is to increase the flow rate entering the tunnels from 265 l/s to 1265 l/s and to lead the additional 1000 l/s to a new penstock connected to the second tunnel's outlet. In this way, a hydraulic head of 130 m could be used for power generation for over 600 households (mechanical power: 0.8 to 1.1 MW, annual electrical energy production: 2.5 to 3.6 GWh, depending on the variant considered). The report reviews the history of water use at this location and its present use as well as a feasibility study previously made. The project is described, including water collection points, conduits, the power station and the particular aspects of the joint use of water for power generation and irrigation from mid April to mid September. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  15. 78 FR 53779 - Notice To Extend Mineral Segregation for the Proposed Silver State Solar Project Near Primm in...

    Science.gov (United States)

    2013-08-30

    ... solar energy project would consist of photovoltaic panels and related ROW appurtenances, including a... Silver State Solar Project Near Primm in Clark County, Nevada AGENCY: Bureau of Land Management, Interior.... SUPPLEMENTARY INFORMATION: Silver State Solar, LLC, has submitted a right-of-way (ROW) application for...

  16. Investigation of a hydrological system related to the stability of slope sediments off the Nice Aiport, Ligurian Sea - preliminary data and a sketch for a MSP drilling proposal

    Science.gov (United States)

    Henry, P.; Stegmann, S.; Sultan, N.; Sage, F.; Migeon, S.; Kopf, A.

    2009-04-01

    results at this stage include: • Long-term pore pressure measurements (Nov 2006 - Nov 2007) in the scar of the 1979 landslide with a piezometer indicate a direct relationship to precipitation events, as the variability of the measured pore pressure follows the rate of rainfall. • Mid-term pore pressure records (34 h) acquired in the landslide scar at different depth levels show contrasting pore pressure evolutions. At 4.25 m below seafloor an increase of pore pressure (~2 kPa) over time could be observed, whereas the pressure in the other levels steadily decreases over time. • FF-CPTU short-term deployments (25-310 mins) in the area of the Nice Airport indicate higher than hydrostatic pore pressures in sediments in the upper part of the slope, close to the scar of the 1979 landslide. • Geochemical analyses of pore waters from the overpressured sediment layers show salinities of 5-50% seawater (SW) concentration and depletion in other constituents (e.g. Cl, Fe, sulfate). Cores E or W of the landslide scar in the undisturbed slope show regular SW profiles, which reveal that the zone of freshening (i.e. groundwater charging through coarse-grained, permeable sands/gravels) is limited in extension, or lies at a deeper level there than in the landslide scar. • ROV surveys indicate that parts of the surface sediment is currently creeping. The Nice airport area is now the focus of a mission-specific (MSP) drilling proposal to study the regional extension of the fluid-charged, metastable slope along the French Riviera. This portion of the Mediterranean coastline receives millions of tourists each year and comprises valuable infrastructure all along. Understanding the preconditioning factors and governing trigger mechanisms for near-shore submarine slope instability is one of the key objectives to be addressed. We hence propose a low-cost drilling project in an area of highest societal and scientific relevance. Both natural and anthropogenic factors can be easily

  17. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA (Environmental Protection Agency) standards (40 CFR Part 192)

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs.

  18. 76 FR 20974 - Owyhee Hydro, LLC; of Preliminary Permit Application Accepted for Filing and Soliciting Comments...

    Science.gov (United States)

    2011-04-14

    ... Energy Regulatory Commission Owyhee Hydro, LLC; of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 18, 2011, Owyhee Hydro, LLC...), proposing to study the feasibility of the Owyhee Pumped Storage Project (project) to be located on...

  19. 76 FR 69720 - Don Pedro Hydro, LLC; Moccasin Pumped Storage, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2011-11-09

    ... the owners' express permission. DPH's proposed Don Pedro Pumped Storage Hydroelectric Project No...) and Moccasin Pumped Storage, LLC (Moccasin) filed ] preliminary permit applications, pursuant to.../91, Logan, UT 84321. (435) 752-2580. Moccasin's Moccasin Pumped Storage Project No. 14305-000 would...

  20. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ....47 kilo-volt (KV) transmission line. The project would have an estimated average annual generation of... notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of...

  1. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ....47 kilo-volt (KV) transmission line. The project would have an estimated average annual generation of... notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of...

  2. Analysis of the effects of Stillwater NWR proposed water management on Newlands Project Operations and Truckee River listed species

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In response to a change in Stillwater NWR Complex purposes, an analysis was performed to evaluate potential impacts to endangered species and Newlands Project...

  3. Effectiveness of the Tier 1 Program of the Project P.A.T.H.S.: Preliminary Objective and Subjective Outcome Evaluation Findings

    Directory of Open Access Journals (Sweden)

    Daniel T.L. Shek

    2006-01-01

    Full Text Available There are two tiers of programs in the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes. In the Tier 1 Program, teaching units based on different positive youth development constructs are covered. Pre- and post-test data utilizing the Chinese Positive Youth Development Scale (CPYDS and post-test subjective outcome evaluation data were collected from 546 students who participated in the 20h Tier 1 Program of the P.A.T.H.S. Project. Results showed that high proportions of the respondents had positive perceptions of the program and the instructors, with 85.3% of the respondents regarding the program as helpful to them. Positive changes in the program participants in many measures of positive youth development were also observed. Although there were some increases in problem behavior in some areas, adolescent problem behavior was generally stable. The present study provides preliminary support for the effectiveness of the Tier 1 Program of the Project P.A.T.H.S. in Hong Kong.

  4. Effectiveness of the Tier 1 Program of the Project P.A.T.H.S.: preliminary objective and subjective outcome evaluation findings.

    Science.gov (United States)

    Shek, Daniel T L

    2006-11-16

    There are two tiers of programs in the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes). In the Tier 1 Program, teaching units based on different positive youth development constructs are covered. Pre- and post-test data utilizing the Chinese Positive Youth Development Scale (CPYDS) and post-test subjective outcome evaluation data were collected from 546 students who participated in the 20 h Tier 1 Program of the P.A.T.H.S. Project. Results showed that high proportions of the respondents had positive perceptions of the program and the instructors, with 85.3% of the respondents regarding the program as helpful to them. Positive changes in the program participants in many measures of positive youth development were also observed. Although there were some increases in problem behavior in some areas, adolescent problem behavior was generally stable. The present study provides preliminary support for the effectiveness of the Tier 1 Program of the Project P.A.T.H.S. in Hong Kong.

  5. Yakima/Klickitat Production Project Preliminary Design Report, Appendix A: Refined Project Goals and Harvest Managment Plan : Experimental Design Plan : Genetic Risk Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    Yakima Indian Nation; Pacific Northwest Laboratory; Washington Department of Fisheries

    1990-03-01

    The purpose of the project as stated by the Northwest Power Planning Council is 'to test the assumption that new artificial production in the Yakima and Klickitat subbasins can be used to increase harvest and enhance natural production while maintaining genetic resources.'

  6. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)

  7. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the §1603 Treasury Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, Daniel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Porro, Gian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Goldberg, Marshall [MRG & Associates, Nevada City, CA (United States)

    2012-04-09

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the §1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the §1603 grant program.

  8. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the §1603Treasury Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, Daniel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Porro, Gian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Goldberg, Marshall [MRG and Associates, New York, NY (United States)

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the §1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the §1603 grant program.

  9. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, D.; Porro, G.; Goldberg, M.

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

  10. Physical and institutional vulnerability assessment method applied in Alpine communities. Preliminary Results of the SAMCO-ANR Project in the Guil Valley (French Southern Alps)

    Science.gov (United States)

    Carlier, Benoit; Dujarric, Constance; Puissant, Anne; Lissak, Candide; Viel, Vincent; Bétard, François; Madelin, Malika; Fort, Monique; Arnaud-Fassetta, Gilles

    2015-04-01

    The Guil catchment is particularly prone to torrential and gravitational hazards such as floods, debris flows, landslides or avalanches due to several predisposing factors (bedrock supplying abundant debris, strong hillslope-channel connectivity) in a context of summer Mediterranean rainstorms as triggers. These hazards severely impact the local population (fatalities, destruction of buildings and infrastructures, loss of agricultural land, road closures). Since the second half of the 20th century, the progressive decline of agro-pastoralism and the development of tourism activities led to a concentration of human stakes on alluvial cones and valley bottom, therefore an increase of vulnerability for mountainous communities. Following the 1957 and 2000 catastrophic floods and the 1948 and 2008 avalanche episodes, some measures were taken to reduce exposure to risks (engineering works, standards of construction, rescue training…). Nevertheless, in front of urban expansion (land pressures and political pressures) and obsolescence of the existing protective measures, it is essential to reassess the vulnerability of the stakes exposed to hazards. Vulnerability analysis is, together with hazard evaluation, one of the major steps of risk assessment. In the frame of the SAMCO project designed for mountain risk assessment, our goal is to estimate specific form of vulnerability for communities living in the Upper Guil catchment in order to provide useful documentation for a better management of the valley bottom and the implementation of adequate mitigation measures. Here we present preliminary results on three municipalities of the upper Guil catchment: Aiguilles, Abriès, and Ristolas. We propose an empirical semi-quantitative indicator of potential hazards consequences on element at risk (based on GIS) with an application to different (local and regional scale) scales. This indicator, called Potential Damage Index, enable us to describe, quantify, and visualize direct

  11. SatBałtyk - A Baltic environmental satellite remote sensing system - an ongoing project in Poland. Part 2: Practical applicability and preliminary results

    Directory of Open Access Journals (Sweden)

    Bogdan Woźniak

    2011-11-01

    Full Text Available This paper is the second part of the description of the first stage of the SatBałtyk project's implementation. Part 1 (Woźniak et al. 2011, in this issue presents the assumptions and objectives of SatBałtyk and describes the most important stages in the history of our research, which is the foundation of this project. It also discusses the operation and general structure of the SatBałtyk system. Part 2 addresses various aspects of the practical applicability of the SatBałtyk Operational System to Baltic ecosystem monitoring. Examples are given of the Baltic's characteristics estimated using the preliminary versions of the algorithms in this Operational System. At the current stage of research, these algorithms apply mainly to the characteristics of the solar energy influx and the distribution of this energy among the various processes taking place in the atmosphere-sea system, and also to the radiation balance of the sea surface, the irradiance conditions for photosynthesis and the condition of plant communities in the water, sea surface temperature distributions and some other marine phenomena correlated with this temperature. Monitoring results obtained with these preliminary algorithms are exemplified in the form of distribution maps of selected abiotic parameters of the Baltic, as well as structural and functional characteristics of this ecosystem governed by these parameters in the Baltic's many basins. The maps cover practically the whole area of the Baltic Sea. Also given are results of preliminary inspections of the accuracy of the magnitudes shown on the maps. In actual fact, the errors of these estimates are relatively small. The further practical application of this set of algorithms (to be gradually made more specific is therefore entirely justified as the basis of the SatBałtyk system for the effective operational monitoring of the state and functioning of Baltic ecosystems. This article also outlines the plans for extending

  12. Project Prometheus

    Science.gov (United States)

    Johnson, Steve

    2003-01-01

    Project Prometheus will enable a new paradigm in the scientific exploration of the Solar System. The proposed JIMO mission will start a new generation of missions characterized by more maneuverability, flexibility, power and lifetime. Project Prometheus organization is established at NASA Headquarters: 1.Organization established to carry out development of JIMO, nuclear power (radioisotope), and nuclear propulsion research. 2.Completed broad technology and national capacity assessments to inform decision making on planning and technology development. 3.Awarded five NRA s for nuclear propulsion research. 4.Radioisotope power systems in development, and Plutonium-238 being purchased from Russia. 5.Formulated science driven near-term and long-term plan for the safe utilization of nuclear propulsion based missions. 6.Completed preliminary studies (Pre-Phase A) of JIMO and other missions. 7.Initiated JIMO Phase A studies by Contractors and NASA.

  13. A Preliminary Review of U.S. Forest Service Business Practices To Authorize Special Uses, Including Energy Infrastructure Projects, on National Forest System Lands

    Energy Technology Data Exchange (ETDEWEB)

    Wescott, K. L. [Argonne National Lab. (ANL), Argonne, IL (United States); May, J. E. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, H. R. [Argonne National Lab. (ANL), Argonne, IL (United States); Brunner, D. L. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-01

    The U.S. Forest Service (USFS) Special Uses-Lands Program is in jeopardy. Although this program, authorized in Title 36, Part 251, of the U.S. Code of Federal Regulations (36 CFR Part 251), ranks among the top four revenue-generating programs for use of National Forest System (NFS) lands, along with the Timber, Minerals, and Special Uses-Recreation Programs, the Special Uses-Lands Program is in a state of neglect. Repeated cuts in funding (a decrease of 26% from fiscal years 2010 to 2014) are adversely affecting staffing and training, which in turn is affecting timely permit processing and ultimately the public’s ability to use and benefit from NFS lands. In addition, highly experienced staff with valuable institutional knowledge of the program have begun to retire. The ability of the program to function under these dire circumstances can be attributed to the dedication of Special Uses staff to the program and their commitment to the public. The initial focus of this report was to identify opportunities for improving performance of permitting and review for large energy infrastructure-related projects. However, it became clear during this analysis that these projects are generally adequately staffed and managed. This is due in large part to the availability of cost-recovery dollars and the high-profile nature of these projects. However, it also became apparent that larger issues affecting the bulk of the work of the Special Uses-Lands Program need to be addressed immediately. This report is a preliminary examination of the state of the Special Uses-Lands Program and focuses on a few key items requiring immediate attention. Further investigation through case studies is recommended to dig deeper into the Special Uses-Lands Program business process to determine the most costeffective strategies for streamlining the overall process and the metrics by which performance can be evaluated, including for the permitting and tracking of energy infrastructure projects.

  14. 78 FR 35019 - FFP Project 132, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-06-11

    ...-ampere, 4.16- kilovolt (kV)/69-kV three-phase step-up transformer; (7) a new substation 40 feet wide by... substation to an existing substation. The estimated annual generation of the Allegheny 7 Project would be 89...

  15. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing... Virginia and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC...

  16. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  17. Archaeological Survey of the Proposed Johnston Trails Project in the Downstream Corridor, Saylorville Lake, Polk County, Iowa. Phase 1

    Science.gov (United States)

    1993-01-01

    Benn report "eared" lanceolate points, points that are similar to Clovis -type points but without basal flutes, and the Browns Valley points that have...and Leah D. Rogers 1985 Interlertive Overview of Cultura Resouwves in Say/orvil/e Lake, Iowa, VoL I. Project CAR-627, Cen- ter for Archaeological

  18. Is the clock ticking for terminally ill patients in Israel? Preliminary comment on a proposal for a bill of rights for the terminally ill.

    Science.gov (United States)

    Barilan, Y M

    2004-08-01

    This paper presents and discusses a recent Israeli proposal to legislate on the rights of the dying patient. A gap exists between elitist biases of the committee proposing the law, and popular values and sentiments. The proposed law divides the dying patients into two groups: "those who wish to go on living" and "those who wish to die". The former will have a right to life prolonging extraordinary care. It is not clear who would foot the bill for this care. Also it is hard to see how this munificence could fail to discriminate against all other patients. Both the secular ethicists and the rabbis involved in drawing up the proposal accepted the assumption that it is good for some terminal patients to die. The rabbis objected, however, to direct and active interventions that shorten life. The solution arrived at was to install timers in the ventilators so as to allow them to expire automatically unless the patient wishes for their resetting.

  19. Preliminary project study Cerneux Gorge, Moutier, La Birse - Renewal of concession for water use; Vorprojektstudie Kraftwerk Cerneux Gorge Moutier, La Birse. Erneuerung der Konzession

    Energy Technology Data Exchange (ETDEWEB)

    Engel, A.; Weber, E.; Zimmermann, D.

    2001-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes a project study for a 180 kW small hydropower plant on the Birse river in Cerneux Gorge, Switzerland. The project foresees a refurbishment of the installation, whose present structures and machinery date back to 1926 and which does not optimally use the water flow and head available. The development of the project is described and technical details of the proposed hydropower installation including its 'rubber dam' - a large rubber tube that can be inflated with water - and the power-plant's turbine and generator are given, as are figures on the plant's planned power production. A fish ladder enables the river fauna to pass round the dam and provides a residual water flow for the river bed between dam and turbine outlet at the same time. Figures are presented on water flow, power generation and investment costs.

  20. SCHOOL MILK DEMAND – INTERACTION BETWEEN POLICY AND OTHER FACTORS: SOME PRELIMINARY FINDINGS OF A REGIONAL PROJECT

    OpenAIRE

    Christoph, Inken B.; Peter, Guenter; Rothe, Andrea; Salamon, Petra; Weber, Sascha A.; Weible, Daniela

    2010-01-01

    Given the recent steadily declining consumption of school milk in Germany, a research project was set up by the German Federal Ministry of Food, Agriculture and Consumer Protection, in affiliation with other institutions, to retrieve quantifiable information on the different influencing factors and to provide approaches for improving the school milk demand. Main objectives are to evaluate impacts of factors like price, attitudes and habits (especially consumption habits), social background, g...

  1. Preliminary FLUKA study of the proposed PSNF installation - A description of the implemented geometry with an analysis of some operational aspects

    CERN Document Server

    Calviani, M; Sala, P; Vlachoudis, V; CERN. Geneva. ATS Department

    2011-01-01

    A recent experimental proposal in the form of a Memorandum has been discussed at the SPSC (SPS and PS experiments Committee) session of April 2011, with the objective of investigating anomalous nu_mu --> nu_e neutrino oscillations; this proposal has followed a letter of intent published in 2009. The proposed experiment would be a short-baseline neutrino experiment with two detectors placed at 120 m and 850 m from the secondary production target. In order to achieve the required beam parameters, it has been proposed to reactivate the discontinued PS neutrino facility, which was operational in the early 80s, located in the TT7 tunnel. The present note describes the implementation of the secondary beam production elements of the proposed PS Neutrino Facility within the FLUKA Monte Carlo code as well as the complete infrastructure of the TT7 tunnel; the note also contains a respective analysis of some critical aspects related to energy deposition in the beam line, of the ambient dose rate equivalent in public a...

  2. Overcoming Dietary Assessment Challenges in Low-Income Countries: Technological Solutions Proposed by the International Dietary Data Expansion (INDDEX) Project.

    Science.gov (United States)

    Coates, Jennifer C; Colaiezzi, Brooke A; Bell, Winnie; Charrondiere, U Ruth; Leclercq, Catherine

    2017-03-16

    An increasing number of low-income countries (LICs) exhibit high rates of malnutrition coincident with rising rates of overweight and obesity. Individual-level dietary data are needed to inform effective responses, yet dietary data from large-scale surveys conducted in LICs remain extremely limited. This discussion paper first seeks to highlight the barriers to collection and use of individual-level dietary data in LICs. Second, it introduces readers to new technological developments and research initiatives to remedy this situation, led by the International Dietary Data Expansion (INDDEX) Project. Constraints to conducting large-scale dietary assessments include significant costs, time burden, technical complexity, and limited investment in dietary research infrastructure, including the necessary tools and databases required to collect individual-level dietary data in large surveys. To address existing bottlenecks, the INDDEX Project is developing a dietary assessment platform for LICs, called INDDEX24, consisting of a mobile application integrated with a web database application, which is expected to facilitate seamless data collection and processing. These tools will be subject to rigorous testing including feasibility, validation, and cost studies. To scale up dietary data collection and use in LICs, the INDDEX Project will also invest in food composition databases, an individual-level dietary data dissemination platform, and capacity development activities. Although the INDDEX Project activities are expected to improve the ability of researchers and policymakers in low-income countries to collect, process, and use dietary data, the global nutrition community is urged to commit further significant investments in order to adequately address the range and scope of challenges described in this paper.

  3. Overcoming Dietary Assessment Challenges in Low-Income Countries: Technological Solutions Proposed by the International Dietary Data Expansion (INDDEX) Project

    Science.gov (United States)

    Coates, Jennifer C.; Colaiezzi, Brooke A.; Bell, Winnie; Charrondiere, U. Ruth; Leclercq, Catherine

    2017-01-01

    An increasing number of low-income countries (LICs) exhibit high rates of malnutrition coincident with rising rates of overweight and obesity. Individual-level dietary data are needed to inform effective responses, yet dietary data from large-scale surveys conducted in LICs remain extremely limited. This discussion paper first seeks to highlight the barriers to collection and use of individual-level dietary data in LICs. Second, it introduces readers to new technological developments and research initiatives to remedy this situation, led by the International Dietary Data Expansion (INDDEX) Project. Constraints to conducting large-scale dietary assessments include significant costs, time burden, technical complexity, and limited investment in dietary research infrastructure, including the necessary tools and databases required to collect individual-level dietary data in large surveys. To address existing bottlenecks, the INDDEX Project is developing a dietary assessment platform for LICs, called INDDEX24, consisting of a mobile application integrated with a web database application, which is expected to facilitate seamless data collection and processing. These tools will be subject to rigorous testing including feasibility, validation, and cost studies. To scale up dietary data collection and use in LICs, the INDDEX Project will also invest in food composition databases, an individual-level dietary data dissemination platform, and capacity development activities. Although the INDDEX Project activities are expected to improve the ability of researchers and policymakers in low-income countries to collect, process, and use dietary data, the global nutrition community is urged to commit further significant investments in order to adequately address the range and scope of challenges described in this paper. PMID:28300759

  4. A Report on the Intensive Cultural Resources Inventory of the Proposed Flood Control Project at Argusville, North Dakota.

    Science.gov (United States)

    1984-04-01

    performed artifact collection, plane table mapping, lithic analysis , and report preparation. Salt River Project-assisted in development of research design...for lithic analysis . Performed extensive lithic analysis . 1977-1976 U.S.D.A. Coconino National Forest, Arizona. Archeological Assistant. Performed...archeoloaical survey, excavation, ceramic and lithic analysis , report preparation. 18 1976 Museum of Northern Arizona, work-study student. Assisted in

  5. Project Icarus: Preliminary Thoughts on the Selection of Probes and Instruments for an Icarus-style Interstellar Mission

    CERN Document Server

    Crawford, Ian A

    2016-01-01

    In this paper we outline the range of probes and scientific instruments that will be required in order for Icarus to fulfill its scientific mission of exploring a nearby star, its attendant planetary system, and the intervening interstellar medium. Based on this preliminary analysis, we estimate that the minimum total Icarus scientific payload mass (i.e. the mass of probes and instruments which must be decelerated to rest in the target system to enable a meaningful programme of scientific investigation) will be in the region of 100 tonnes. Of this, approximately 10 tonnes would be allocated for cruise-phase science instruments, and about 35 tonnes (i.e. the average of estimated lower and upper limits of 28 and 41 tonnes) would be contributed by the intra-system science payload itself (i.e. the dry mass of the stellar and planetary probes and their instruments). The remaining ~55 tonnes is allocated for the sub-probe intra-system propulsion requirements (crudely estimated from current Solar System missions; de...

  6. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  7. 76 FR 74781 - FFP Project 104 LLC, Nolin Lake Hydro LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-12-01

    ... (5) a 4.16/69 KV substation; (6) a 3.5-mile-long, 69 kilo-Volt (kV) transmission line. The proposed... 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed...

  8. 78 FR 35021 - FFP Project 57, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-06-11

    ...; (4) a 4.16/69 kilo-volt (kV) substation; (5) a 200-foot-long, 69kV transmission line. The proposed... notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments...

  9. 76 FR 73612 - Barren River Lake Hydro LLC; FFP Project 94 LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2011-11-29

    ... (MW); (4) a 110-foot-long, 80-foot-wide tailrace; and (5) a proposed 0.8-mile-long, 12.5 kilo-volt (KV... notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments...

  10. A landscape project for the coexistence of agriculture and nature: a proposal for the coastal area of a Natura 2000 site in Sicily (Italy

    Directory of Open Access Journals (Sweden)

    Lara Riguccio

    2016-06-01

    Full Text Available Many rural coastal Mediterranean areas suffer from great anthropomorphic pressure. This is due to intensive agriculture, and construction for residential, tourism and industrial uses. The present work investigates the idea of using a landscape project in the Gulf of Gela in South Sicily to recover the dunes and the area behind them. The method used is based on the literature and will evaluate and interpret the dynamics of the landscape, so as to draw up a landscape plan, which can be used to help sustain the assets of the area, in a way, which is compatible with conserving nature. This method was tested in the LIFE11-Leopoldia project, funded by the European Union. The results of the study form part of the landscape project. This project is aimed at connecting the different productive zones in the area, protecting the natural environments and the rural historical patrimony, through combining the modern road networks with the older slower, historic infrastructure. Three different levels of landscape management are proposed: total protection (the dunes, high-level protection (the area behind the dunes where traditional agriculture is practised, buffer areas and ecological connecting areas, medium levels of protection (sustainable agriculture, green connections and ecological corridors. The key aims of the project are as follows: transversality - repairing the agricultural fabric and the relationship between the land and the sea; sustainability - recovering the environmental system and traditional activities; flexibility - agriculture with only minor environmental impact.

  11. Case Study: Applying the Theory of Planned Behavior as Interventions to Increase Sponsored Project Proposal Submissions from Liberal Arts Faculty

    Science.gov (United States)

    Hartmann, Anita

    2011-01-01

    In the current economic climate, many colleges and universities face similar challenges: the need to increase external sponsorship for research activities and the need to benefit from additional indirect cost recovery. Preparing funding proposals for submission to sponsors is a faculty behavior that can be modified by applying behavioral theory to…

  12. 77 FR 14006 - Proposed Development of the Alaska Stand Alone Gas Pipeline Project (ASAP), From the North Slope...

    Science.gov (United States)

    2012-03-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Proposed Development of the Alaska Stand Alone Gas Pipeline... January 20, 2012, issue of the Federal Register (77 FR No. 13), the U.S. Army Corps of Engineers...

  13. 76 FR 62066 - Phusion Projects, LLC, et al.; Analysis of Proposed Consent Order To Aid Public Comment

    Science.gov (United States)

    2011-10-06

    ... settles alleged violations of federal law prohibiting unfair or deceptive acts or practices or unfair..., Internet advertising including fan photo contests, and print solicitations to potential distributors... deceptive, in light of their representation that a can of Four Loko contained a single serving. The proposed...

  14. 76 FR 27342 - Central Utah Project Completion Act; Notice of Intent To Accept Proposals, Select a Potential...

    Science.gov (United States)

    2011-05-11

    ...: Current Federal policy encourages non-Federal development of environmentally sustainable hydropower... and/or marketing considerations. Interested entities are invited to submit a proposal for...'s purchasing and/or marketing the power may also be obtained from Ms. Kyriss at the address...

  15. Preliminary Assessment of the Proposed Closure of the National Technical Information Service (NTIS): A Report to the President and the Congress.

    Science.gov (United States)

    Horton, Forest Woody, Ed.; Kadec, Sarah T., Ed.

    This document reports on an NCLIS (National Commission on Libraries and Information Science) study of the proposal to close NTIS (National Technical Information Service) and shift its paper, microfiche, digital archives, and bibliographic database to the Library of Congress. The report documents the results of research, interviews, public…

  16. Preliminary Planning in Construction of Engineering Projects%浅谈建设工程项目的施工前期策划

    Institute of Scientific and Technical Information of China (English)

    吴利科; 杜建钢

    2011-01-01

    With the booming of management method of turnkey contracting in construction area, the contractor's focus has turned from construction management into multi-management of engineering, procurement, construction and testing, facing the increasing management difficulty and risk. Therefore setting clear objectives and plans, identifying implementing risks and making insuring measures at the beginning of the implementation of contract can make sure the project develop toward the established goals effectively. This article narrate the role of preliminary planning in construction, and briefly state the thread of making the preliminary planning in construction by taking the example of turnkey contracting in hydraulic engineering.%随着建筑施工行业总承包管理模式的发展,施工承包商也相应从单一的施工管理转变为涉及设计、施工、采购、调试等多方面的管理,管理难度和风险加大.因此,在合同实施伊始进行施工前期策划,确定管理目标,理顺工作思路,辨识实施风险,制定保证措施,可以有效控制各项管理任务按照既定目标推进.文章叙述了施工前期策划在工程管理中的作用,并以水工总承包工程为例浅述了施工前期策划的编制思路.

  17. 'EURISOL Desktop Assistant Toolkit' (EDAT): a modeling, simulation and visualization support to the preliminary radiological assessment of RIB projects

    CERN Document Server

    Vamanu, D; Acasandrei, V; Plukis, A; Maceika, E

    The paper describes an approach taken within EURISOL-DS project (European Isotope Separation On-Line Radioactive Ion Beam Facility) to a number of safety and radioprotection issues raised by the advent of radioactive ion beam facilities in the cutting edge area of particle accelerators. The ensuing solution emerged from a collaborative effort of the investigating team-in-charge, affiliated with ‘Horia Hulubei’ National Institute of Physics and Nuclear Engineering in Bucharest, with expert colleagues at the Physics Institute in Vilnius, and at CERN.

  18. Empirical Projection of Long-Term Coastal Erosion Hazards in Hawaii Under Rising Sea Levels: Preliminary Findings

    Science.gov (United States)

    Anderson, T. R.; Barbee, M.; Fletcher, C. H., II; Romine, B. M.; Lemmo, S.

    2014-12-01

    Chronic erosion dominates sandy beaches of Hawaii causing loss and beach narrowing; and damaging homes, infrastructure, and critical habitat. Increased rates of sea level rise (SLR) will likely exacerbate these problems. Shoreline managers and other stakeholders need guidance to support long-range planning and adaptation efforts. Despite recent advances in sophisticated numerical models, there remains a need for simple approaches to estimating land areas that are threatened by erosion on decadal-to-century time scales due to SLR. While not as detailed as numerical models, empirical approaches can provide a first-order approximation to shoreline change that may be useful for coastal management and planning. Shoreline managers in Hawaii commonly work with historical data to provide information on coastal erosion. Simple linear regression methods have been especially attractive in Hawaii, where complex reef topography can cause high spatial variability in sediment transport patterns. Yet, facing projected future increases in the rate of SLR, extrapolating historical trends is insufficient. Predictions of shoreline change with SLR commonly employ controversial geometric models (e.g., the Bruun Model) that do not account for sediment availability and alongshore variability captured in historical data. Furthermore, these two projections often produce conflicting results. We report here on the early results of mapping probability-based erosion hazard areas, determined by combining the extrapolated historical shoreline change model with a geometric model of shoreline response (Davidson-Arnott, 2005) to strictly accelerated SLR. A geographic information system is used to explore the intersection between potential erosion hazards, coastal geology, and development patterns. This approach is attractive because it is simple and utilizes existing datasets. Yet, its simplicity implies broad assumptions of the coastal system and leads to large uncertainty in projections. To

  19. Worldwide Evaluations of Quinoa: Preliminary Results from Post International Year of Quinoa FAO Projects in Nine Countries

    Science.gov (United States)

    Bazile, Didier; Pulvento, Cataldo; Verniau, Alexis; Al-Nusairi, Mohammad S.; Ba, Djibi; Breidy, Joelle; Hassan, Layth; Mohammed, Maarouf I.; Mambetov, Omurbek; Otambekova, Munira; Sepahvand, Niaz Ali; Shams, Amr; Souici, Djamel; Miri, Khaled; Padulosi, Stefano

    2016-01-01

    Chenopodium quinoa Willd., a high quality grain crop, is resistant to abiotic stresses (drought, cold, and salt) and offers an optimal source of protein. Quinoa represents a symbol of crop genetic diversity across the Andean region. In recent years, this crop has undergone a major expansion outside its countries of origin. The activities carried out within the framework of the International Year of Quinoa provided a great contribution to raise awareness on the multiple benefits of quinoa as well as to its wider cultivation at the global level. FAO is actively involved in promoting and evaluating the cultivation of quinoa in 26 countries outside the Andean region with the aim to strengthen food and nutrition security. The main goal of this research is to evaluate the adaptability of selected quinoa genotypes under different environments outside the Andean region. This paper presents the preliminary results from nine countries. Field evaluations were conducted during 2013/2014 and 2014/2015 in Asia (Kyrgyzstan and Tajikistan), and the Near East and North African countries (Algeria, Egypt, Iraq, Iran, Lebanon, Mauritania, and Yemen). In each country, the trials were carried out in different locations that globally represent the diversity of 19 agrarian systems under different agro-ecological conditions. Twenty-one genotypes of quinoa were tested using the same experimental protocol in all locations consisting in a randomized complete block design (RCBD) with three replicates. Some genotypes showed higher yields and the Q18 and Q12 landraces displayed greater adaptation than others to new environmental conditions. The Q21 and Q26 landraces were evaluated with stable and satisfactory levels of yield (>1 t.ha−1) in each of the different trial sites. This production stability is of considerable importance especially under climate change uncertainty. While these results suggest that this Andean crop is able to grow in many different environments, social, and cultural

  20. Worldwide Evaluations of Quinoa: Preliminary Results from Post International Year of Quinoa FAO Projects in Nine Countries.

    Science.gov (United States)

    Bazile, Didier; Pulvento, Cataldo; Verniau, Alexis; Al-Nusairi, Mohammad S; Ba, Djibi; Breidy, Joelle; Hassan, Layth; Mohammed, Maarouf I; Mambetov, Omurbek; Otambekova, Munira; Sepahvand, Niaz Ali; Shams, Amr; Souici, Djamel; Miri, Khaled; Padulosi, Stefano

    2016-01-01

    Chenopodium quinoa Willd., a high quality grain crop, is resistant to abiotic stresses (drought, cold, and salt) and offers an optimal source of protein. Quinoa represents a symbol of crop genetic diversity across the Andean region. In recent years, this crop has undergone a major expansion outside its countries of origin. The activities carried out within the framework of the International Year of Quinoa provided a great contribution to raise awareness on the multiple benefits of quinoa as well as to its wider cultivation at the global level. FAO is actively involved in promoting and evaluating the cultivation of quinoa in 26 countries outside the Andean region with the aim to strengthen food and nutrition security. The main goal of this research is to evaluate the adaptability of selected quinoa genotypes under different environments outside the Andean region. This paper presents the preliminary results from nine countries. Field evaluations were conducted during 2013/2014 and 2014/2015 in Asia (Kyrgyzstan and Tajikistan), and the Near East and North African countries (Algeria, Egypt, Iraq, Iran, Lebanon, Mauritania, and Yemen). In each country, the trials were carried out in different locations that globally represent the diversity of 19 agrarian systems under different agro-ecological conditions. Twenty-one genotypes of quinoa were tested using the same experimental protocol in all locations consisting in a randomized complete block design (RCBD) with three replicates. Some genotypes showed higher yields and the Q18 and Q12 landraces displayed greater adaptation than others to new environmental conditions. The Q21 and Q26 landraces were evaluated with stable and satisfactory levels of yield (>1 t.ha(-1)) in each of the different trial sites. This production stability is of considerable importance especially under climate change uncertainty. While these results suggest that this Andean crop is able to grow in many different environments, social, and cultural

  1. EURISOL Desktop Assistant Toolkit (EDAT): A modeling, simulation and visualization support to the preliminary radiological assessment of RIB projects

    Science.gov (United States)

    Vamanu, D.; Vamanu, B.; Acasandrei, V.; Maceika, E.; Plukis, A.

    2010-04-01

    The paper describes an approach taken within the EURISOL-DS project (European Isotope Separation Online Radioactive Ion Beam Facility) to a number of safety and radioprotection issues raised by the advent of radioactive ion beam facilities in the cutting edge area of particle accelerators. The ensuing solution emerged from a collaborative effort of the investigating team-in-charge, affiliated with the Horia Hulubei National Institute of Physics and Nuclear Engineering in Bucharest, with expert colleagues at the Physics Institute in Vilnius, and at CERN, within the participation in the EURISOL-DS project, Sub-Task B: Radiation, Activation, Shielding and Doses of the Safety and Radioprotection, Task 5. The work was primarily geared towards the identification of knowledge and data in line with validated, accepted and nationally/internationally recommended methods and models of radiological assessment applied within the nuclear power fuel cycle, deemed to be suitable for assessing health and environmental impact of accelerator operations as well. As a result, a computer software platform code-named “EURISOL Desktop Assistant Toolkit” was developed. The software is, inter alia, capable to assess radiation doses from pure or isotopically mixed open or shielded point sources; emergency response-relevant doses; critical group doses via complex pathways, including the air, the water, and the food chain and derived release limits for the normal, routine operations of nuclear facilities. Dedicated data libraries and GIS (Geographic Information System) facilities assist the input/output operations.

  2. Water transfer and major environmental provisions of the Central Valley Project Improvement Act: A preliminary economic evaluation

    Science.gov (United States)

    Loomis, John B.

    1994-06-01

    Increasing block water pricing, water transfer, and wildlife refuge water supply provisions of the Central Valley Project (CVP) Improvement Act are analyzed in terms of likely farmer response and economic efficiency of these provisions. Based on a simplified partial equilibrium analysis, we estimate small, but significant water conservation savings due to pricing reform, the potential for substantial water transfers to non-CVP customers in severe drought years when the water price exceeds 110 per acre foot (1 acre foot equals 1.234 × 103 m3) and positive net benefits for implementation of the wildlife refuge water supply provisions. The high threshold water price is partly a result of requiring farmers to pay full cost on transferred water plus a surcharge of 25 per acre foot if the water is transferred to a non-CVP user. The act also sets an important precedent for water pricing reform, water transfer provisions, and environmental surcharges on water users that may find their way to other Bureau of Reclamation projects.

  3. Technical proposal for including health in the procedures for assessing the environmental impact of policies, plans, programmes, projects and activities

    Directory of Open Access Journals (Sweden)

    Almudena García Nieto

    2015-05-01

    Full Text Available Health was an element of general licensing procedures until Spain joined the EU in 1986, when the health report became diluted. The purpose of this article is to provide an overview of this topic’s current regulatory framework and to try to briefly describe health priorities and the channels for feasibly integrating the health variable in the environmental assessment of plans, programmes and projects from the public and private sectors. The current existence of the Environmental Assessment Act and the Public Health Act may help to achieve this.When preparing a strategic environmental study and an environmental impact study, the health impact assessment should be considered an essential step in these environmental procedures and have the same legal treatment as the “compulsory and determinant reports” of said procedures.Thus, it is concluded that the regulatory development of the aspects relating to the assessment of the health impact of the plans, programmes and projects envisaged in the Environmental Assessment Act is essential, the health impact assessment being the tool for doing so.

  4. Measuring impact of e-learning on quality and learning outcomes: a proposal for a PhD project

    OpenAIRE

    Rita Falcão; Alfredo Soeiro

    2007-01-01

    In the Information Society, the term eLearning is widely used, when referring to the application of ICT to Education. This term, when analysed in a simplistic way, means "electronic learning" or learning using electronic media. However, the definition proposed by the eLearning Initiative of the European Commission, includes deeper and more complex concepts: "The use of new multimedia technologies and the Internet to improve the quality of learning by facilitating access to resources and servi...

  5. Preliminary field trial of a putative research algorithm for diagnosing ICD-11 personality disorders in psychiatric patients: 2. Proposed trait domains.

    Science.gov (United States)

    Kim, Youl-Ri; Tyrer, Peter; Lee, Hong-Seock; Kim, Sung-Gon; Hwang, Soon-Taek; Lee, Gi Young; Mulder, Roger

    2015-11-01

    This field trial examines the discriminant validity of five trait domains of the originally proposed research algorithm for diagnosing International Classification of Diseases (ICD)-11 personality disorders. This trial was carried out in South Korea where a total of 124 patients with personality disorder participated in the study. Participants were assessed using originally proposed monothetic trait domains of asocial-schizoid, antisocial-dissocial, anxious-dependent, emotionally unstable and anankastic-obsessional groups of the research algorithm in ICD-11. Their assessments were compared to those from the Personality Assessment Schedule interview, and the five-factor model (FFM). A total of 48.4% of patients were found to have pathology in two or more domains. In the discriminant analysis, 64.2% of the grouped cases of the originally proposed ICD-11 domains were correctly classified by the five domain categories using the Personality Assessment Schedule, with the highest accuracy in the anankastic-obsessional domain and the lowest accuracy in the emotionally unstable domain. In comparison, the asocial-schizoid, anxious-dependent and the emotionally unstable domains were moderately correlated with the FFM, whereas the anankastic-obsessional or antisocial-dissocial domains were not significantly correlated with the FFM. In this field trial, we demonstrated the limited discriminant and the convergent validities of the originally proposed trait domains of the research algorithm for diagnosing ICD-11 personality disorder. The results suggest that the anankastic, asocial and dissocial domains show good discrimination, whereas the anxious-dependent and emotionally unstable ones overlap too much and have been subsequently revised.

  6. Preliminary Public Design Report for the Texas Clean Energy Project: Topical Report - Phase 1, June 2010-July 2011

    Energy Technology Data Exchange (ETDEWEB)

    Mattes, Karl

    2012-02-01

    Summit Texas Clean Energy, LLC (Summit) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin sub-bituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. Front-end Engineering and Design (FEED) commenced in June 2010 and was completed in July 2011, setting the design basis for entering into the detailed engineering phase of the project. During Phase 1, TCEP conducted and completed the FEED, applied for and received its air construction permit, provided engineering and other technical information required for development of the draft Environmental Impact Statement, and

  7. Preliminary ice shelf-ocean simulation results from idealized standalone-ocean and coupled model intercomparison projects (MIPs)

    Science.gov (United States)

    Asay-Davis, Xylar; Martin, Daniel

    2016-04-01

    The second Ice Shelf-Ocean MIP (ISOMIP+) and the first Marine Ice Sheet-Ocean MIP (MISOMIP1) prescribe a set of idealized experiments for ocean models with ice-shelf cavities and coupled ice sheet-ocean models, respectively. ISOMIP+ and MISOMIP1 were designed together with the third Marine Ice Sheet MIP (MISMIP+) with three main goals, namely that the MIPs should provide: a controlled forum for researchers to compare their model results with those from other models during model development. a path for testing components in the process of developing coupled ice sheet-ocean models. a basic setup from which a large variety of parameter and process studies can usefully be performed. The experimental design for the three MIPs is currently under review in Geoscientific Model Development (Asay-Davis et al. 2015, doi:10.5194/gmdd-8-9859-2015). We present preliminary results from ISOMIP+ and MISOMIP1 experiments using several ocean-only and coupled ice sheet-ocean models. Among ocean models, we show that differences in model behavior are significant enough that similar results can only be achieved by tuning model parameters (e.g. boundary-layer transfer coefficients, drag coefficients, vertical mixing parameterizations) for each models. This tuning is constrained by a desired mean melt rate in quasi-steady state under specified forcing conditions, akin to how models would be tuned based on observations for non-idealized simulations. We also present a number of parameter studies based the MIP experiments. Again, using several models, we show that melt rates respond sub-linearly to both changes in the square root of the drag coefficient and the heat-transfer coefficient, and that melting is relatively insensitive to horizontal-mixing coefficients (perhaps because the resolution is sufficient to permit eddies) but more sensitive to vertical-mixing coefficients. We show that the choice of the equation of state (linear or nonlinear) does not have a significant impact as long as

  8. THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

    2003-08-01

    This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1

  9. Ecological evaluation of proposed dredged material from Richmond Harbor Deepening Project and the intensive study of the Turning Basin

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Mayhew, H.L.; Karle, L.M.; Kohn, N.P.; White, P.J.; Word, J.Q.; Michaels, L.L. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1995-06-01

    Richmond Harbor is on the eastern shoreline of central San Francisco Bay and its access channels and several of the shipping berths are no longer wide or deep enough to accommodate modem deeper-draft vessels. The Water Resources Development Act of 1986 (PL99-662) authorized the US Army Corps of Engineers (USACE), San Francisco District to deepen and widen the navigation channels in Richmond Harbor. Several options for disposal of the material from this dredging project are under consideration by USACE: disposal within San Francisco Bay, at open-ocean disposal sites, or at uplands disposal sites. Purpose of this study was to conduct comprehensive evaluations, including chemical, biological, and bioaccumulation testing of sediments in selected areas of Richmond Harbor. This information was required by the Environmental Protection Agency (EPA) and USACE. Battelle/Marine Sciences Laboratory collected 20 core samples, both 4-in. and 12-in., to a project depth of -40 ft mean lower low water (MLLW) (-38 ft MLLW plus 2 ft of overdepth) using a vibratory-hammer core. These 20 field samples were combined to form five test composites plus an older bay mud (OBM) composite that were analyzed for physical/chemical parameters, biological toxicity, and tissue chemistry. Solid-phase tests were conducted with the amphipod, Rhepoxynius abronius; the clam, Macoma nasuta; and the polychaete worm, Nephtys caecoides. Suspended-particulate-phase (SPP) tests were conducted with the sanddab, Citharichthys stigmaeus; the mysid, Holmesimysis costata; and the bivalve, Mytilus galloprovincialis. Bioaccumulation of contaminants was measured in tissues of Macoma nasuta and Nereis virens. Sediments from one ocean reference sediment, and two in-bay reference sediments, were tested concurrently. Results from analysis of the five test treatments were statistically compared with the reference sediment R-OS in the first five sections of this report.

  10. Ecological evaluation of proposed dredged material from Richmond Harbor Deepening Project and the intensive study of the Turning Basin

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Mayhew, H.L.; Karle, L.M.; Kohn, N.P.; White, P.J.; Word, J.Q.; Michaels, L.L. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1995-06-01

    Richmond Harbor is on the eastern shoreline of central San Francisco Bay and its access channels and several of the shipping berths are no longer wide or deep enough to accommodate modem deeper-draft vessels. The Water Resources Development Act of 1986 (PL99-662) authorized the US Army Corps of Engineers (USACE), San Francisco District to deepen and widen the navigation channels in Richmond Harbor. Several options for disposal of the material from this dredging project are under consideration by USACE: disposal within San Francisco Bay, at open-ocean disposal sites, or at uplands disposal sites. Purpose of this study was to conduct comprehensive evaluations, including chemical, biological, and bioaccumulation testing of sediments in selected areas of Richmond Harbor. This information was required by the Environmental Protection Agency (EPA) and USACE. Battelle/Marine Sciences Laboratory collected 20 core samples, both 4-in. and 12-in., to a project depth of -40 ft mean lower low water (MLLW) (-38 ft MLLW plus 2 ft of overdepth) using a vibratory-hammer core. These 20 field samples were combined to form five test composites plus an older bay mud (OBM) composite that were analyzed for physical/chemical parameters, biological toxicity, and tissue chemistry. Solid-phase tests were conducted with the amphipod, Rhepoxynius abronius; the clam, Macoma nasuta; and the polychaete worm, Nephtys caecoides. Suspended-particulate-phase (SPP) tests were conducted with the sanddab, Citharichthys stigmaeus; the mysid, Holmesimysis costata; and the bivalve, Mytilus galloprovincialis. Bioaccumulation of contaminants was measured in tissues of Macoma nasuta and Nereis virens. Sediments from one ocean reference sediment, and two in-bay reference sediments, were tested concurrently. Results from analysis of the five test treatments were statistically compared with the reference sediment R-OS in the first five sections of this report.

  11. Proposal for the award of a contract for the supply of an overhead travelling crane and rails for the CNGS Project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of an overhead travelling crane and rails for the CNGS project. Following a market survey carried out among 102 firms in 18 Member States, a call for tenders (IT-3025/ST/CNGS) was sent on 28 May 2003 to five firms and two consortia in four Member States. By the closing date, CERN had received three tenders from two firms and a consortium in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with BRUNNHUBER (DE), the lowest bidder, for the supply of an overhead travelling crane and rails for the CNGS Project for a total amount of 1 213 900 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 54%; DE - 46%.

  12. Proposta de modelo de atendimento multidisciplinar para disfonias relacionadas ao trabalho: estudo preliminar Multidisciplinary protocol proposal for professional dysphonia: preliminary study

    Directory of Open Access Journals (Sweden)

    Erica Ortiz

    2004-10-01

    multiple causes and its evaluation, ethiological conclusion and occupational reports aren't defined yet. AIM: In order to obtain a more accurate and comprehensive evaluation, a multidisciplinary protocol was elaborated to ensure proper medical scientific support. It consists of anamnesis, physical exam, laryngeal endoscopy, perceptive voice analysis and Voice Handicap Index application (VHI. STUDY DESIGN: Transversal historic cohort. MATERIAL E MÉTODO: In this preliminary study, the protocol was applied on 15 voice professionals with dysphonia. RESULTS: 13,3% with normal voice performance; 33,3% with functional dysphonia; 46% with organic dysphonia. Dysphonia was related to the voice-oriented job in 40% cases and it was ruled out in 46,6%. CONCLUSION: We concluded that the protocol is complete enough to help otolaryngologists evaluate this workers' category.

  13. Evaluating interannual vegetation anomalies in the Basilicata region using satellite spot vegetation 1999-2011 time series: preliminary results from the Mitra project

    Science.gov (United States)

    Lasaponara, Rosa; Desantis, Fortunato; Aromando, Angelo; Lanorte, Antonio

    2013-04-01

    The Basilicata region funded a fesr project, MITRA to develop reliable low cost technologies to preserve and enhance natural and cultural heritage in some relevant areas selected as test cases. " Cultural heritage and the natural heritage are increasingly threatened with destruction not only by the traditional causes of decay, but also by changing social and economic conditions which aggravate the situation with even more formidable phenomena of damage or destruction, from THE GENERAL CONFERENCE of the United Nations Educational, Scientific and Cultural Organization meeting in Paris from 17 October to 21 November 1972, at its seventeenth session, available on line " (http://whc.unesco.org/en/conventiontext/). This paper is focused on the preliminary results obtained in the framework of the Mitra project. In particular, a temporal series (1999-2011) of the yearly Maximum Value Composit of SPOT/VEGETATION NDVI was used to carried out investigation on the whole Basilicata region. The PCA was used as a first step of data transform to enhance regions of localized change in multi-temporal data sets (Lasaponara 2006). Results from PCA were further processed using Support Vector machine (SVM) to identify and map land degradation phenomenon Both naturally vegetated areas (forest, shrub-land, herbaceous cover) and agricultural lands have been investigated in order to extract the most prominent natural and/or man induced alterations affecting vegetation behavior. Such analyses can provide valuable information for monitoring the status of vegetation which is an indicator of the degree of stress namely any disturbance that adversely influences plants in response to natural hazards and/or anthropogenic activities. Our findings suggest that the jointly use of PCA and SVM PCA can provide valuable information for environmental management policies involving biodiversity preservation and rational exploitation of natural and agricultural resources. Rosa Lasaponara 2006, On the use of

  14. Sugarcane straw harvest effects on soil quality and plant growth: preliminary data synthesis of a multi-local project running in Brazil

    Science.gov (United States)

    Cherubin, Maurício; Cerri, Carlos E. P.; Feigl, Brigitte J.; Cerri, Carlos C.

    2017-04-01

    Brazil is the largest sugarcane producer in the world, and consequently, it is one of major players in the bioenergy production sector. Despite that, growing demands for bioenergies have raised the interest of Brazilian sugarcane industry to harvest the sugarcane straw left on the field for cellulosic ethanol production and/or bioelectricity cogeneration. However, crop residues have a key role in the soil, affecting directly or indirectly multiple soil functions and related ecosystem services. Therefore, indiscriminate straw harvest could jeopardize soil quality, decreasing its capacity to sustain plant productivity over time. In order to evaluate the potential impacts of sugarcane straw harvest on soil quality and plant growth, we are conducting since 2014 a multi-local project across central-southern Brazil, the main core of sugarcane production in the world. A wide range of soil chemical, physical and biological parameters, as well as, plant biomass production has been quantified under increasing straw harvest intensities. Our preliminary findings have showed that short-term straw harvest management did not affect total organic C stocks; however, high straw harvest led to significant reduction in labile C forms (e.g., microbial biomass C and N), and abundance of microbial communities as well. Sugarcane straw harvest affects soil nutrient cycling, since significant amount of nutrients are removed annually by straw, especially in top (green) leaves. In addition, our data show that straw acts as a thermal insulator, decreasing soil temperature amplitude and keeping soil moisture for a longer time. Straw harvest management did not affect sugarcane yields in the first two crop seasons. Based on this first synthesis of the project, we conclude that short-term sugarcane straw harvest led to soil changes, especially in more sensitive and dynamic properties, which did not affect the plant yield. However, long-term impacts should be monitored towards a better

  15. Earthquake location determination using data from DOMERAPI and BMKG seismic networks: A preliminary result of DOMERAPI project

    Science.gov (United States)

    Ramdhan, Mohamad; Nugraha, Andri Dian; Widiyantoro, Sri; Métaxian, Jean-Philippe; Valencia, Ayunda Aulia

    2015-04-01

    DOMERAPI project has been conducted to comprehensively study the internal structure of Merapi volcano, especially about deep structural features beneath the volcano. DOMERAPI earthquake monitoring network consists of 46 broad-band seismometers installed around the Merapi volcano. Earthquake hypocenter determination is a very important step for further studies, such as hypocenter relocation and seismic tomographic imaging. Ray paths from earthquake events occurring outside the Merapi region can be utilized to delineate the deep magma structure. Earthquakes occurring outside the DOMERAPI seismic network will produce an azimuthal gap greater than 1800. Owing to this situation the stations from BMKG seismic network can be used jointly to minimize the azimuthal gap. We identified earthquake events manually and carefully, and then picked arrival times of P and S waves. The data from the DOMERAPI seismic network were combined with the BMKG data catalogue to determine earthquake events outside the Merapi region. For future work, we will also use the BPPTKG (Center for Research and Development of Geological Disaster Technology) data catalogue in order to study shallow structures beneath the Merapi volcano. The application of all data catalogues will provide good information as input for further advanced studies and volcano hazards mitigation.

  16. Earthquake location determination using data from DOMERAPI and BMKG seismic networks: A preliminary result of DOMERAPI project

    Energy Technology Data Exchange (ETDEWEB)

    Ramdhan, Mohamad [Study Program of Earth Science, Institut Teknologi Bandung, Jl. Ganesa 10, Bandung, 40132 (Indonesia); Agency for Meteorology, Climatology and Geophysics of Indonesia (BMKG) Jl. Angkasa 1 No. 2 Kemayoran, Jakarta Pusat, 10720 (Indonesia); Nugraha, Andri Dian; Widiyantoro, Sri [Global Geophysics Research Group, Faculty of Mining and Petroleum Engineering, Institut TeknologiBandung, Jl. Ganesa 10, Bandung, 40132 (Indonesia); Métaxian, Jean-Philippe [Institut de Recherche pour le Développement (IRD) (France); Valencia, Ayunda Aulia, E-mail: mohamad.ramdhan@bmkg.go.id [Study Program of Geophysical Engineering, Institut Teknologi Bandung, Jl. Ganesa 10, Bandung, 40132 (Indonesia)

    2015-04-24

    DOMERAPI project has been conducted to comprehensively study the internal structure of Merapi volcano, especially about deep structural features beneath the volcano. DOMERAPI earthquake monitoring network consists of 46 broad-band seismometers installed around the Merapi volcano. Earthquake hypocenter determination is a very important step for further studies, such as hypocenter relocation and seismic tomographic imaging. Ray paths from earthquake events occurring outside the Merapi region can be utilized to delineate the deep magma structure. Earthquakes occurring outside the DOMERAPI seismic network will produce an azimuthal gap greater than 180{sup 0}. Owing to this situation the stations from BMKG seismic network can be used jointly to minimize the azimuthal gap. We identified earthquake events manually and carefully, and then picked arrival times of P and S waves. The data from the DOMERAPI seismic network were combined with the BMKG data catalogue to determine earthquake events outside the Merapi region. For future work, we will also use the BPPTKG (Center for Research and Development of Geological Disaster Technology) data catalogue in order to study shallow structures beneath the Merapi volcano. The application of all data catalogues will provide good information as input for further advanced studies and volcano hazards mitigation.

  17. A multidisciplinary project to improve the quality of cancer pain management in Italy: background, methods, and preliminary results.

    Science.gov (United States)

    Apolone, Giovanni; Mangano, Simone; Compagnoni, Anna; Negri, Emanuele; Mosconi, Paola; Mannino, Salvatore; Villa, Marco; Zuccaro, Piergiorgio

    2006-01-01

    Pain afflicts most cancer patients, mainly in the advanced and metastatic phases of the disease. Despite the existence of several guidelines for cancer pain management that are based on the recommendations by the World Health Organization and the availability of effective treatments for 70% to 90% of cases, undertreatment is well documented and can involve up to 40% of patients. Undertreatment is usually attributed to an incorrect use of opioids for reasons often conceptualized in terms of barriers related to healthcare provider, patient, family, institution, and society. In Italy, opioid consumption rates are among the lowest in Europe despite some of recent efforts to improve the analgesic prescription and utilization. In the context of a wide project coordinated by the Mario Negri Institute, a non-for-profit private foundation located in Milan, Italy, 4 activities were launched: (1) a critical appraisal of information available on the Web, with the preparation and publication of a meta-site to facilitate the use of selected resources; (2) an evaluation of prescriptions of analgesic drugs in a cohort of cancer patients using a large administrative database; (3) a nationwide outcome research study to assess the epidemiology, quality, and effectiveness of different analgesic strategies; and (4) a multimodal, community-based intervention based on information, education, and training programs to change the knowledge, opinions, and attitude toward cancer pain treatment. Activities started in 2005. Some results and outputs are already available; others will be ready by the end of 2007.

  18. The PIRLA project (Paleoecological investigation of recent lake acidification). Preliminary results for the Adirondacks, New England, N. Great Lakes States, and N. Florida

    Energy Technology Data Exchange (ETDEWEB)

    Charles, D.F.; Whitehead, D.R.; Anderson, D.S.; Bienert, R.; Camburn, K.E.; Cook, R.B.; Crisman, T.L.; Davis, R.B.; Ford, J.; Fry, B.D.

    1986-09-01

    The PIRLA project is an interdisciplinary paleoecological study designed to provide reconstructions of the recent acidification histories of a representative set of lakes in four acid-sensitive regions in North America. We are trying to determime if lakes in the study regions have acidified, and if so, to what extent, over what time period and why. Sediment cores from 5 to 15 lakes in each region are being analyzed for several characteristics. Diatoms and chrysophytes are being used to reconstruct lakewater pH. Results for three Adirondack lakes with current pH of 4.8 to 5.0 indicate a decrease in pH beginning in the 1930's-1950's. Increased atmospheric deposition of strong acids appears to be the primary factor responsible for the pH decline. Two lakes (pH 4.4 and 4.7) in New England show clear evidence of acidification probably due to acidic deposition. Preliminary reconstructions for two lakes in Michigan (pH 4.4 and 5.6), one in Wisconsin (pH 5.3), and one in Minnesota (pH 6.8) suggest no recent pH decrease. For the one Florida lake (pH 4.4) analyzed, inferred pH decreases by about 0.5 unit, beginning in the 1950's; the cause has not been determined. 26 refs.

  19. Pirla Project (paleoecological investigation of recent lake acidification): preliminary results for the Adirondacks, New England, Great Lakes States, and N. Florida

    Energy Technology Data Exchange (ETDEWEB)

    Charles, D.F.; Whitehead, D.R.; Anderson, D.S.; Bienert, R.; Camburn, K.E.; Cook, R.B.; Crisman, T.L.; Davis, R.B.; Ford, J.; Fry, B.D.; Hites, R.A.

    1986-01-01

    The PIRLA project is an interdisciplinary paleoecological study designed to provide reconstructions of the recent acidification histories of a representative set of lakes in four acid-sensitive regions in North America. We are trying to determine if lakes in the study regions have acidified, and if so, to what extent, over what time period and why. Sediment cores from 5 to 15 lakes in each region are being analyzed for several characteristics. Diatoms and chrysophytes are being used to reconstruct lake water pH. Results for three Adirondack lakes with current pH of 4.8 to 5.0 indicate a decrease in pH beginning in the 1930's-1950's. Increased atmospheric deposition of strong acids appears to be the primary factor responsible for the pH decline. Two lakes (pH 4.4 and 4.7) in New England show clear evidence of acidification probably due to acidic deposition. Preliminary reconstruction for two lakes in Michigan (pH 4.4 and 5.6), one in Wisconsin (pH 5.3), and one in Minnesota (pH 6.8) suggest no recent pH decrease. For the one Florida lake (pH 4.4) analyzed, inferred pH decreases by about 0.5 unit, beginning in the 1950s; the cause has not been determined.

  20. Preliminary project for the 'Satz' drinking-water hydropower facility in Soerenberg, Switzerland - Appendix; Vorprojekt Trinkwasser-Kraftwerksatz, Soerenberg. Programm Kleinwasserkraftwerke. Anhaenge

    Energy Technology Data Exchange (ETDEWEB)

    Ruff, H.; Widmer, P. [RuffEngineering, Zuerich (Switzerland); Schubert, T. [Praktikant CKW, Luzern (Switzerland); Wobmann, P. [Kost und Partner AG, Sursee (Switzerland)

    2007-03-15

    This comprehensive appendix to a final report for the Swiss Federal Office of Energy (SFOE) deals with a project concerning the realisation of a small hydro-power installation using a drinking-water supply system in the UNESCO Biosphere Reserve in Entlebuch, Switzerland. Technical details of the variants for the realisation of the hydro-power installation are presented. These include schematics of the variants proposed, weighting factors for the various factors involved, topographical details of the conduits necessary, management of the reservoirs involved, factors influencing the Pelton turbines used and an overview of spring-water quantities involved. Economic aspects and costs of the variants that were examined are presented.

  1. Preliminary analysis of seismic anisotropy in the uppermost mantle beneath NW Pacific reveled by the Normal Oceanic Mantle project

    Science.gov (United States)

    Takeo, A.; Isse, T.; Nishida, K.; Kawakatsu, H.; Shiobara, H.; Sugioka, H.; Ito, A.; Utada, H.

    2013-12-01

    Seismic structure including anisotropy in the oceanic uppermost mantle is essential for understanding deformation related to plate tectonics. Recent reports of a sharp discontinuity between the high velocity LID and the low velocity zone (LVZ) especially emphasize the importance of observation in oceanic basins apart from ridges and hotspots for determining the structure including LID and LVZ. In this study, we analyzed records of four broadband ocean bottom seismometers (BBOBSs) deployed in the northwest of Shatsky Rise by the pilot observation of the Normal Oceanic Mantle (NOMan) project in 2010-2011. We first measured average phase velocities of surface waves at periods of 5-30 s by the ambient-noise cross correlation method. Based on the method of Takeo et al. (in prep. GJI), we analyzed fundamental- and first higher- mode Rayleigh waves and fundamental-mode Love wave simultaneously by waveform fitting after the correction of clock delay. At periods of 25-100 s, we measured phase velocities of fundamental-mode surface waves by the array analysis of teleseismic waveforms. We then determined one-dimensional radially anisotropic structure beneath the array by the method of Takeo et al. (2013, JGR). The obtained structure shows transition from LID to LVZ at depths of 50-80km, which is marginally consistent with the depth of ~80 km estimated by a receiver function analysis at WP2 station situated at east of the studies area (Kawakatsu et al., 2009). The velocity gradient in the LID is almost zero and inconsistent with the simple cooling model of homogeneous oceanic plate. The average intensity of S-wave radial anisotropy at depths of ~10-220 km is ~3% (VSH>VSV). We further estimated S-wave azimuthal anisotropy at depths of ~30-100 km by analyzing teleseismic fundamental-mode Rayleigh waves at periods of 25-50 s. The intensity of anisotropy is 2-3%. The fastest direction is about N35W, close to that of Sn-wave velocity around WP2 station obtained by a refraction

  2. Preliminary Assessment of the Impact on Reactor Vessel dpa Rates Due to Installation of a Proposed Low Enriched Uranium (LEU) Core in the High Flux Isotope Reactor (HFIR)

    Energy Technology Data Exchange (ETDEWEB)

    Daily, Charles R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-10-01

    An assessment of the impact on the High Flux Isotope Reactor (HFIR) reactor vessel (RV) displacements-per-atom (dpa) rates due to operations with the proposed low enriched uranium (LEU) core described by Ilas and Primm has been performed and is presented herein. The analyses documented herein support the conclusion that conversion of HFIR to low-enriched uranium (LEU) core operations using the LEU core design of Ilas and Primm will have no negative impact on HFIR RV dpa rates. Since its inception, HFIR has been operated with highly enriched uranium (HEU) cores. As part of an effort sponsored by the National Nuclear Security Administration (NNSA), conversion to LEU cores is being considered for future HFIR operations. The HFIR LEU configurations analyzed are consistent with the LEU core models used by Ilas and Primm and the HEU balance-of-plant models used by Risner and Blakeman in the latest analyses performed to support the HFIR materials surveillance program. The Risner and Blakeman analyses, as well as the studies documented herein, are the first to apply the hybrid transport methods available in the Automated Variance reduction Generator (ADVANTG) code to HFIR RV dpa rate calculations. These calculations have been performed on the Oak Ridge National Laboratory (ORNL) Institutional Cluster (OIC) with version 1.60 of the Monte Carlo N-Particle 5 (MCNP5) computer code.

  3. The superconducting proposal for the CS magnet system of FAST: a preliminary analysis of the heat load due to AC losses

    CERN Document Server

    Pompeo, N

    2011-01-01

    FAST (Fusion Advanced Studies Torus), the Italian proposal of a Satellite Facility to ITER, is a compact tokamak (R$_0$ = 1.82 m, a = 0.64 m, triangularity $\\delta$ = 0.4) able to investigate non-linear dynamics effects of $\\alpha$-particle behavior in burning plasmas and to test technical solutions for the first wall/divertor directly relevant for ITER and DEMO. Currently, ENEA is investigating the feasibility of a superconducting solution for the magnet system. This paper focuses on the analysis of the CS (Central Solenoid) magnet thermal behavior. In particular, considering a superconducting solution for the CS which uses the room available in the resistive design and referring to one of the most severe scenario envisaged for FAST, the heat load of the CS winding pack due to AC losses is preliminarily evaluated. The results provide a tentative baseline for the definition of the strand requirements and conductor design, that can be accepted in order to fulfil the design requirements.

  4. 火星全球导航卫星系统%Preliminary Design of the Constellation Distribution for a Proposed Mars GNSS

    Institute of Scientific and Technical Information of China (English)

    韩婷婷; 史弦; 简念川; 冯礼和; 平劲松

    2011-01-01

    The principles of designing constellations for global navigation and positioning systems above terrestrial planets are discussed, and an initial example configuration for a proposed Mars Global Navigation Satellite System Constellation is analyzed. A method for assessing optimal constellation designs is also presented. This study may serve as a reference for designing and establishing Mars global navigation satellite systems in the future.%讨论了建立类地行星全球导航定位系统的意义,并对火星全球导航卫星系统星座的布构型进行了初步分析设计.对不同导航星座的覆盖特性与导航定位性能进行了评估,给出了最佳星座设计,它可以作为将来建立火星导航卫星系统的星座设计参考.

  5. P15 - Reduced Physical Activity Correlates with Osteopenic or Osteoporotic Status in Postmenopausal Women: Preliminary Results from the Prof Project

    Science.gov (United States)

    Piscitelli, P.; Coli, G.; Argentiero, A.; Neglia, C.; Chitano, G.; Paladini, D.; Mundi, S.; Paladini, L.; Greco, M.; Girasoli, C.; Gianicolo, M. E.; Pantile, V.; Argentiero, D.; De Padova, G.; Pansa, L.; Nibio, L.; Di Giuseppe, P.; Minosi, A.; Cirasino, L.; Laselva, G.; Scialpi, M.; Benvenuto, M.; D’Angela, D.; Brandi, M. L.; Distante, A.

    2010-01-01

    Aims: Italy has a considerable yearly incidence of osteoporotic fractures: about 300,000. In this context, preventive strategies are based mainly on early identification of people at higher risk of fractures and of clinical risk factors. Within the PROF (Prevention of Osteoporotic Fractures) project, i.e. a synergic effort of researchers and clinicians aimed at preventing osteoporotic fractures in Southern Apulia (Salento), a region with an increasing number of elderly people, we investigated the correlation between reduced physical activity and osteopenic or osteoporotic status in postmenopausal women. Methods: During the years 2009–2010, 5665 postmenopausal women (mean age 62 years, range 39 to 86) underwent quantitative bone ultrasound (QUS) measurement at the heel and phalanx. Demographic and anamnestic data were recorded for all the patients, including BMI, nutrition, menopause, physical activity, previous fractures, familial fragility fractures. Three demineralisation categories were identified a priori: a) Demineralisation, when any T-score <−1.0 SD was observed; b) Severe demineralisation, whenever a T-score <−2.0 was observed, corresponding to a higher risk of fracture; c) Osteoporosis, whenever a T-score <−2.5±0.2 (for the heel) or T-score <−3.2±0.2 (for the phalanx) was observed. Descriptive statistical analyses were performed in order to assess the correlation between low physical activity (patients declaring themselves to be completely sedentary) and osteopenic or osteoporotic status. Results: Of the 5665 women, demineralisation was observed in 4487 patients (79%), corresponding to severe osteopenia or osteoporotic status in 2823 women (50% of all the examined subjects) and frank osteoporosis in 846 patients (15%). In total, of the 1255 women with a clinical history of reduced physical activity, 1058 (84.3%) presented demineralisation corresponding at least to an osteopenic status. In addition, demineralisation typical of severe osteopenia

  6. P17 - Early Menopause Influences Osteopenic or Osteoporotic Status in Postmenopausal Women: Preliminary Results from the Prof Project

    Science.gov (United States)

    Piscitelli, P.; Rigliano, V.; Neglia, C.; Chitano, G.; Argentiero, A.; Paladini, D.; Mundi, S.; Paladini, L.; Greco, M.; Girasoli, C.; Gianicolo, M. E.; Pantile, V.; Argentiero, D.; De Padova, G.; Nibio, L.; Pansa, L.; Di Giuseppe, P.; Minosi, A.; Cirasino, L.; Laselva, G.; Scialpi, M.; D’Angela, D.; Benvenuto, M.; Brandi, M. L.; Distante, A.

    2010-01-01

    Aims: There is evidence that demographic trends in Southern Apulia are characterised by a huge proportion of elderly people relative to the general population, resulting in an ageing index which is higher than that recorded in other Southern Italian regions and/or sub-regions. Within the PROF (Prevention of Osteoporotic Fractures) project, which aims to foster synergistic efforts between researchers and clinicians, we investigated the correlation between early menopause and osteopenic or osteoporotic status in postmenopausal women by quantitative bone ultrasound evaluation (QUS). Methods: In a period of almost six years (2004–2010), 5665 postmenopausal women (mean age 55, ranging from 39 to 84) were screened by QUS at either the heel or the phalanx. Demographic and anamnestic data were recorded for all the patients, including BMI, nutrition, menopause, physical activity, previous fractures, familial fragility fractures. Three categories of demineralisation were identified: a) Demineralisation, when any T-score <−1.0 SD was observed; b) Severe demineralisation, whenever a T-score <−2.0 was observed, corresponding to a higher risk of fracture; c) Osteoporosis, whenever a T-score <−2.5±0.2 (for the heel) or T-score <−3.2±0.2 (for the phalanx) was observed. Descriptive statistical analyses were performed in order to assess the correlation between early menopause (<45 years of age) and the osteopenic or osteoporotic status of the patients. Results: Of the 5665 subjects examined overall, demineralisation was observed in 4487 subjects (79%), with severe osteopenia or osteoporotic status being documented in 2823 women (50%) and frank osteoporotic status in 846 (15%). In total, of 1169 women reporting an early menopause, 937 showed demineralisation corresponding to at least an osteopenic status (80%). In 605 of these patients (65%), there was a severe osteopenic or osteoporotic status, while 182 women experiencing an early menopause were found to be frankly

  7. Improved operation of district heating consumer installations using a self-learning district heating meter. Preliminary project; Driftsoptimering af fjernvarmebrugerinstallationer vha. selvlaerende fjernvarmemaaler. Forprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Drysdale, A.

    2001-12-01

    In brief, the aim of the project has been to develop a 'self-learning' district heating meter that, after being trained with operational data from a consumer installation, can effectuate optimal control of the installation. As this is judged to be a difficult task for traditional control techniques, a control method based on the use of a neural network has been used. In the project two different neural network solutions have been developed: 1) NN (or NN controller) which is a pure neural network solution consisting of two nets. The nets are trained for predicting the overall demands (NN predictor) and for implementing the best-suited control strategy (NN controller) respectively; 2) NNPIFF (or NNPIFF controller) which combines the NN controller with other control mechanisms. These are a room model, a radiator model, a PI controller and two 'feed-forward' controllers compensating for changes in outdoor temperature and the effects of passive solar heating. The NN solution is based on controlling flow, while NNPIFF is based on controlling heat (this gives the possibility for feed-forward control and thus the of compensating for the effects of passive solar heating and changing outdoor temperatures). The conclusions from this preliminary project are that: 1) The initial results from testing the NN-controller with simulated data were very encouraging. This indicates that neural networks can be used to control heating systems and as a result of this achieve energy savings; 2) Field tests with the MAK controller in a test installation have shown that the PI controller is capable of regulating the meter-valve combination. Whilst the PI-controller is operative, the NN controller is 'rained behind the scenes'. The advantage of this form of operation is that training can take place without affecting the users' comfort. However, the results from the field test have also shown that training of the NN controller has not been sufficient for it

  8. Sistemática proposta para seleção de fornecedores em gestão de projetos Systematic proposal for selecting suppliers in project management

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2007-12-01

    Full Text Available A gestão de projetos vem sendo alvo de inúmeros estudos nos últimos anos, uma vez que os projetos estão se tornando cada vez mais complexos. Os fornecedores exercem papéis cruciais na gestão de projetos, estando envolvidos em uma rede de atividades conectadas que, se não desenvolvidas de forma adequada, podem comprometer o sucesso do projeto. Dessa forma, aumenta-se a necessidade de fornecedores qualificados, comprometidos com os objetivos do cliente e capazes de empreender os projetos solicitados. A questão abordada é a seleção de fornecedores para um empreendimento que atenda aos múltiplos objetivos dos decisores (representantes do cliente, de modo que desenvolvam um trabalho conjunto, reduzindo custos e promovendo melhorias nos processos construtivos, assegurando, a qualidade do produto final. Diante da complexidade do problema, propõe-se uma sistemática para seleção de fornecedores, que considera o processo de seleção integrada da equipe do projeto, mediante a revisão bibliográfica realizada.The project management has been the target of numerous studies in recent years since projects have become increasingly complex. The suppliers play crucial roles in project management being involved in a network of connected activities, which if not developed appropriatel, can compromise the success of the project. Hence, there has been a growing need for qualified suppliers, who are committed to the client’s objectives and are able to undertake the projects requested. The question brought up is the suppliers’ selection for a project according to the multiple criteria of the decision makers (clients representation , so they can undertake an integrated work reducing costs and providing improvements in the constructive processes, assuring the quality of the final product. Due to the complexity of the problem, a systematic proposal is put forward for selecting suppliers considering an integrated selection process of the project team

  9. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  10. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  11. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  12. Proposal of a tiered conceptual framework for sustainable design and planning of large-scale development projects in the metropolitan context

    Energy Technology Data Exchange (ETDEWEB)

    Morrissey, J., Email: John.morrissey@rmit.edu.au [RMIT, Melbourne, Victoria (Australia). Centre for Design; Iyer-Raniga, U.; McLaughlin, P.; Mills, A.

    2010-07-01

    The overwhelming threat posed by climate change means that increasingly, emphasis is being placed on the need to integrate sustainability considerations into all areas of policy making, planning and development. Actors in the built environment are progressively considering environmental and social issues alongside functional and economic aspects of development projects. However, to date in Australia and internationally, there have been few practical examples of integrated applications of sustainability principles in the built environment across design, planning, construction, operation and de-construction phases. Notable initiatives have tended to be narrow in scope, focusing on either mitigation or adaptation strategies. Integrated considerations of impacts from component and building scales to city and regional scales and across physical and socio-economic dimensions are urgently needed, particularly for long-life major infrastructure projects. This paper proposes a conceptual framework based on the principal that early intervention is the most cost-effective and efficient means of implementing effective strategies for mitigation and adaptation. A Strategic Environmental Assessment (SEA) approach is forwarded as an umbrella analytical framework, assembled from analytical methods which are strategically 'tiered' to inform different stages of the planning and decision-making process. Techniques such as Ecological footprint, Life cycle costing and Risk analysis may be applied to integrate sustainable design, construction and planning considerations which address both mitigation and adaptation dimensions, results of each analysis ultimately being collated into the overall SEA. This integrated conceptual framework for sustainable, resilient and cost-effective infrastructure development will in practice be applied to assess selected case-studies of major development projects in Australia, focusing on the area of stadium development. Practically applied and

  13. Evaluation of Dredged Material Proposed for Ocean Disposal from Federal Projects in New York and New Jersey and the Military Ocean Terminal (MOTBY)

    Energy Technology Data Exchange (ETDEWEB)

    Barrows, E.S.; Antrim, L.D.; Pinza, M.R.; Gardiner, W.W.; Kohn, N.P.; Gruendell, B.D.; Mayhew, H.L.; Word, J.Q.; Rosman, L.B. [Battelle Marine Sciences Laboratory, Sequim, Washington (United States)

    1996-08-01

    The U.S. Army Corps of Engineers (USACE) is authorized by Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (MPRSA), Public Law 92-532, and by the Clean Water Act of 1972 (CWA) and Amendments of 1977 to permit, evaluate, and regulate the disposal of dredged material in ocean waters to minimize adverse environmental effects. Compliance with the regulations of the MPRSA calls for physical and biological testing of sediment proposed for dredging prior to its disposal in ocean waters. The testing required by the MPRSA criteria is conducted under a testing manual developed by the USACE and the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the `Green Book.` Testing protocols in the Green Book include bulk sediment analysis, grain size analysis, elutriate testing, and biological testing. The biological testing includes bioassays for acute toxicity as well as analysis to determine bioaccumulation of certain contaminants by marine organisms. The objective of the USACE-NYD Federal Projects Program was to evaluate sediment proposed for dredging and unconfined ocean disposal at the Mud Dump Site. The results of analytical measurements and bioassays performed on the test sediments were compared with analyses of sediment from the Mud Dump Reference Site to determine whether the test sediments were acutely toxic to marine organisms or resulted in statistically significantly greater bioaccumulation of contaminants in marine organisms, relative to the reference sediment. Testing for the federal project areas was performed according to the requirements.

  14. The SeIsmic monitoring and vulneraBilitY framework for civiL protection (SIBYL) Project: An overview and preliminary results

    Science.gov (United States)

    Fleming, Kevin; Parolai, Stefano; Iervolino, Iunio; Pitilakis, Kyriazis; Petryna, Yuriy

    2016-04-01

    The SIBYL project is setting out to contribute to enhancing the capacity of Civil Protection (CP) authorities to rapidly and cost-effectively assess the seismic vulnerability of the built environment. The reason for this arises from the occurrence of seismic swarms or foreshocks, which leads to the requirement that CP authorities must rapidly assess the threatened area's vulnerability. This is especially important for those regions where there is a dearth of up-to-date and reliable information. The result will be a multi-faceted framework, made up of methodologies and software tools, that provides information to advise decision makers as to the most appropriate preventative actions to be taken. It will cover cases where there is a need for short-notice vulnerability assessment in a pre-event situation, and the monitoring of the built environment's dynamic vulnerability during a seismic sequence. Coupled with this will be the ability to stimulate long-term management plans, independent of the hazard or disaster of concern. The monitoring itself will involve low-cost sensing units which may be easily installed in critical infrastructures. The framework will be flexible enough to be employed over multiple spatial scales, and it will be developed with a modular structure which will ease its applicability to other natural hazard types. Likewise, it will be able to be adapted to the needs of CP authorities in different countries within their own hazard context. This presentation therefore provides an overview of the aims and expected outcomes of SIBYL, while explaining the tools currently being developed and refined, as well as preliminary results of several field campaigns.

  15. 75 FR 42730 - Goodwin Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-07-22

    ... Energy Regulatory Commission Goodwin Power, LLC; Notice of Preliminary Permit Application Accepted for..., 2010, Goodwin Power, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Goodwin Dam Project, located on the Stanislaus River in...

  16. 75 FR 28596 - Bryant Mountain LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-05-21

    ... the Federal Power Act, proposing to study the feasibility of the Bryant Mountain Hydroelectric Pumped Storage Project. The sole purpose of a preliminary permit, if issued, is to grant the permit holder... acres and a storage capacity of 60,00075 acre-feet and normal water surface elevation of 5500 feet mean...

  17. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    Science.gov (United States)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  18. Evaluation of Water Quality Conditions Near Proposed Fish Production Sites Associated with the Yakima Fisheries Project, 1991-1993 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dauble, Dennis D.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP.

  19. Proposal to negotiate a collaboration agreement for the design, testing and prototyping of superconducting elements for the High Luminosity LHC (HL-LHC) project and for the production of spare quadrupole magnets for LHC

    CERN Document Server

    2016-01-01

    Proposal to negotiate a collaboration agreement for the design, testing and prototyping of superconducting elements for the High Luminosity LHC (HL-LHC) project and for the production of spare quadrupole magnets for LHC

  20. Hmong Cosmology: Proposed Model, Preliminary Insights

    Directory of Open Access Journals (Sweden)

    Vincent K. Her

    2006-01-01

    Full Text Available Is there an underlying structure to Hmong cosmology? What are its components? And how might these interrelate? In this paper, I will show that the Hmong cosmos consists of three separate realms and that these are connected together by the cycle of the human soul. Using zaaj qhuabke, I will trace the journey of the deceased and look at how ritual movement is expressive of human agency, narrative experience and community history. My insights are based on primary fieldwork research carried out for a doctoral dissertation on Hmong funeral rites in the Midwest.

  1. GOCE observations and geophysical constraints to better understand the lithosphere and geodynamical processes under the Paraná-Etendeka region: preliminary results of PERLA project

    Science.gov (United States)

    Mariani, Patrizia; Braitenberg, Carla

    2014-05-01

    In the light of the considerable progress made by the modern geodetic satellite mission GOCE, one of the challenges of the European Space Agency (ESA) is to improve knowledge of physical properties and geodynamic processes of the lithosphere and the Earth deep interior, and their relationship to Earth-surface changes. In this context we propose a study that aims to understand the two pieces of lithosphere underlying the Paraná-Etendeka conjugate margins (Brazil, and Angola-Namibia). It is essential to collect the geological and geophysical information about the thickness and the density of sedimentary layers, crustal thickness and mantle inhomogeneities. Our methodology integrates the geophysical database with the GOCE data, product of the innovative gravity satellite mission, that was concluded November 2013. Crustal thickness was obtained from all available seismological datasets. The density-depth relation of the shallow layers is modeled by geophysical data collected from literature and from the on-shore and off-shore drilling programs. Several compaction laws are used to estimate the density of each layer. This information is necessary to reduce the observations considering the gravity effect of all intracrustal known layers, to resolve the deep crustal structures (e.g. Moho and intracrustal bodies). A positive gravity anomaly is expected due to the magmatic activity of the Paraná-Etendeka province. The smaller-scale and shallow gravity anomaly should be due to the occurrence of the volcanic activity close to the alkaline-carbonatite complexes, while the large-scale anomaly is expected from the underplating of a wide denser body at the depth of the crustal mantle boundary. In the present work some preliminary results of the inversion of the residual gravity anomaly in terms of densities in the middle and shallow lithosphere under the Paraná-Etendeka region will be presented and interpreted.

  2. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  3. Fiscal 1998 engineer interchange project on the engineer interchange project (coal mine technology field), international interchange project. Preliminary study in Russia; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Russia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the engineer interchange project (coal mine technology field), field survey for collecting information was made on the level and trend of production technology through visits to some coal industry organizations by specialists in Russia which is one candidate for the engineer training project by sending and receiving. Although coal is positioned as an important energy resource in Russia, poor business performance and a decrease in production are reported because of privatization and cur off of subsidies during a transfer period to a market economy. In addition, severe environment surrounding the Russian coal industry such as a delay of facility renewal due to poor funds, overage facilities, and moral reduction of workers due to a rationing delay has a potential for further reduction of production. The research group thus surveyed the current state of the Russian coal industry such as actual production structures, actual coal mines, technical levels, and various problem points in Moscow and Baykal districts. (NEDO)

  4. A Proposal of Branding Water - Based Recreational Activities Within The Destination Management Project in The Dalaman Basin, Muğla, Turkey

    Directory of Open Access Journals (Sweden)

    Ali TÜRKER

    2014-08-01

    Full Text Available "Arrival place" (TDK, 2012 or "a place that has different natural features or attractions where visitors are interested in visiting" (Coltman, 1989: 48 were defined as destination. Nowadays this is one of the topics that attention is paid to in tourism literature. However, destination is drawn in a reg ional boundaries rather than political boundaries where tourist resources in a geographic area are clustered. This in turn necessitates the different local government units and non - governmental organizations (NGOs in acting management and marketing togeth er. Dalaman basin boundaries cover Dalaman, Ortaca and Koycegiz municipalities in the province of Mugla. Dalaman international airport is located in the area that tourists have an easy access to reach accommodation establishments soon after they land and t ourists further benefit from the region's historical and touristic values. This study has primarily presented the findings regarding Dalaman Basin Destination Management Project involving these three municipalities, the tourism business representatives, NG Os and Mugla Sıtkı Kocman University lecturers. Through this consecutive meetings among these parties involved, a main conclusion has drawn upon water - based recreational activities should be focused and these activities should be used in marketing the regi on. Further to this conclusion, these water - based activities should be branded. Within this destination management project, "Turkish Water Land" was proposed as a brand name to describe the region‟s water - based activities. The three local authorities of th e Dalaman basin unanimously agreed upon a protocol stating the roles and allocation of investments and expenditures required. Water based recreation activities are located in the region as follows: Dalaman river, Koycegiz lake, Iztuzu and Sarigerme beaches , Ekin and Sarsala bays and Dalyan canal.

  5. Metodologia para gerenciar projetos de pesquisa e desenvolvimento com foco em produtos: uma proposta Management methodology for product-oriented R&D projects: a proposal

    Directory of Open Access Journals (Sweden)

    Andréia Azevedo Pinheiro

    2006-06-01

    Full Text Available As atividades de pesquisa e desenvolvimento (P&D realizadas nos institutos públicos de pesquisa (IPPs têm como característica uma gestão arraigada nas premissas acadêmicas, que priorizam a geração e difusão do conhecimento. Em contrapartida, a necessidade de competitividade tecnológica no mercado e a pressão pela participação, como instrumentos da política pública do esforço nacional rumo à inovação, têm pressionado os IPPs para a busca por resultados mais concretos. Esse fato acarreta a geração de grandes lacunas nos processos relacionados à gestão, induzindo a uma constante necessidade de aperfeiçoamento gerencial, no sentido de criar e melhorar ferramentas que contribuam para adequá-la à nova realidade. Este artigo propõe uma metodologia de gestão de projetos de P&D, que se baseia no direcionamento dos projetos de pesquisa para a obtenção de produtos, e considera suas características multidisciplinares e interdisciplinares e a incerteza inerentes a esse processo. Essa metodologia foi desenvolvida no Instituto de Tecnologia de Fármacos da Fiocruz e é proposta como um modelo original para instituições semelhantes.The Research and Development (R&D activities carried out at public research institutes have a strongly rooted academic-like management which focuses on knowledge improvement. On the other hand, the need for technological competitiveness and contribution in the national effort towards innovation has lead Brazilian organizations to search for more concrete results: products. This fact accounts for huge gaps in management-related processes and a constant need for managerial improvements in order to generate and perfect tools suitable to a new reality. This article proposes a R&D project management methodology focused on research projects that aim at new technological products taking into consideration the multidisciplinary and interdisciplinary aspects and the uncertainty inherent to this process. It

  6. SUSTENTABILIDAD Y COOPERATIVISMO: UNA PROPUESTA METODOLÓGICA BASADA EN UN PROYECTO REAL/SUSTAINABILITY AND COOPERATIVISM: A METHODOLOGICAL PROPOSAL BASED ON A REAL PROJECT

    Directory of Open Access Journals (Sweden)

    Belén FERNÁNDEZ-FEIJÓO SOUTO

    2007-05-01

    Full Text Available El objetivo de este trabajo es mostrar la metodología y la propuesta de actuación diseñados para una de las fases de un Proyecto Interreg III-A, llevado a cabo a lo largo del período 2006-2007, por entidades españolas y portuguesas. La finalidad última de este proyecto europeo es ofrecer una propuesta de futuro para la actual situación de deterioro económico y social de los municipios interiores de la frontera Galicia-Portugal, área de interés prioritario. Tras una breve revisión de los fundamentos teóricos, se describe la metodología empleada en la elaboración del Informe y Mapas de situación del área objetivo para, a partir de ellos, realizar un diagnóstico que permite enunciar la propuesta de modelo de desarrollo rural considerado más adecuado para el impulso económico y social de la zona, bajo criterios de responsabilidad social y articulado mediante empresas de participación./The aim of this work is to describe the methodology and proposals of action designed for the phase of the rural development model integrated in an Interreg III-A project, carried out by Spanish and Portuguese entities in the period 2006-2007. The final objective of this European project is to offer proposals for the future to improve the current situation of economic and social deterioration of primarily the inland town lands of the Galician-Portuguese border area. After a brief review of the basic theory, we describe the methodology used in the elaboration of reports and maps of the area under study. From these a diagnosis is made which permits us to reach conclusions concerning the most adequate model of rural development to give an impulse to the economic and social growth of the area. All of this to be carried under the criteria of social responsibility and based a network of participating enterprises.

  7. Ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters (Phase 3 B of -42-foot project). Volume 1, Analyses and discussion

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, N.P.; Ward, J.A.; Mayhew, H.L.; Word, J.Q.; Barrows, E.S.; Goodwin, S.M.; Lefkovitz, L.F. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1992-06-01

    The Water Resources Development Act of 1986 (Public Law 99-662) authorized the US Army Corps of Engineers (USACE) San Francisco District, to deepen and widen the navigational channels of the Oakland Inner and Outer Harbors to accomodate deeper-draft vessels. The USACE is considering several disposal options for the dredged material removed during these channel improvements including open-water disposal. Dredged material proposed for open-water disposal must be evaluated to determine the potential impacts of the disposal activity on the water column and disposal site enviromments. The USACE requested that Battelle/Marine Sciences Laboratory (MSL) conduct studies to evaluate open-water disposal options for Oakland Harbor sediments. This request developed into the Oakland Harbor Phase III Program. This is Volume 1 of a two-volume report that presents information gathered to determine the suitability of ocean disposal of sediments dredged from Oakland Harbor. This volume contains project background, materials and methods, results, discussion, and conclusions.

  8. Ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters (Phase 3 B of -42-foot project)

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, N.P.; Ward, J.A.; Mayhew, H.L.; Word, J.Q.; Barrows, E.S.; Goodwin, S.M.; Lefkovitz, L.F. (Battelle/Marine Sciences Lab., Sequim, WA (United States))

    1992-06-01

    The Water Resources Development Act of 1986 (Public Law 99-662) authorized the US Army Corps of Engineers (USACE) San Francisco District, to deepen and widen the navigational channels of the Oakland Inner and Outer Harbors to accomodate deeper-draft vessels. The USACE is considering several disposal options for the dredged material removed during these channel improvements including open-water disposal. Dredged material proposed for open-water disposal must be evaluated to determine the potential impacts of the disposal activity on the water column and disposal site enviromments. The USACE requested that Battelle/Marine Sciences Laboratory (MSL) conduct studies to evaluate open-water disposal options for Oakland Harbor sediments. This request developed into the Oakland Harbor Phase III Program. This is Volume 1 of a two-volume report that presents information gathered to determine the suitability of ocean disposal of sediments dredged from Oakland Harbor. This volume contains project background, materials and methods, results, discussion, and conclusions.

  9. Proposal for a technical-economic and environmental evaluation projects for distributed generation; Proposta de avaliacao tecnica-economica-ambiental para projetos de geracao distribuida

    Energy Technology Data Exchange (ETDEWEB)

    Fortes, Marcio Zamboti [Universidade Severino Sombra, Vassouras, RJ (Brazil); Gouvea, Marcos Roberto [Universidade de Sao Paulo (USP), SP (Brazil)

    2008-07-01

    The multi discipline effects in engineering projects, mainly in those of infrastructure, have extended the borders of research to not only evaluate them of the conventional point of view, economic and technical, but also environmental and social. On the other hand, the investor who traditionally searched alternatives only considering the economic and financial performance currently is taken to analyze also the social and environmental aspects. The model described in this paper is a solution proposal to evaluate the merit of an enterprise of distributed generation of thermal origin, considering the economic, social and environmental aspects, using merit indexes that quantify, directly, economic aspects as capital return tax and operating income eliminates, as well as social factors like the impact in the education, health, income and employment rates and still, it verifies the attendance of the environmental restrictions. The solution presented brings a simple and clear form to attribute a merit degree of aggregate to the alternatives to embed distributed generation, considering the intensity of the subjective social responsibility of the investor. The presented model is an important contribution to stimulate a form to evaluate and to prioritize the multi discipline implementation to a distributed generation enterprise, also being able, to be used as financial index or other incentives of the sort. (author)

  10. Preliminary report on the Department of Water Resources Notice of Intention to file an application for certification of DWR Bottle Rock, 78-NOI-7

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The preliminary findings of fact and conclusion adopted by the Commission Committee are presented. Also, a description of the proposed project, a summary of the proceedings to date, and local, state, and federal government agency comments on the proposal are included. Preliminary findings and conclusions are presented on: (a) conformity to the forecast of statewide and service area electric power demands; (b) the degree to which the proposed site and facility conform with applicable local, regional, state, and federal standards, ordinances and laws; (c) the safety and reliability of the facility; and (d) the relative merit of the proposed transmission line corridors. (MHR)

  11. Preliminary report on the Pacific Gas and Electric Company's notice of intention to seek certification for Geysers Unit 16 (78-NOI-6)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The preliminary findings of fact and conclusion adopted by the Commission Committee are presented. Also, a description of the proposed project, a summary of the proceedings to date, and local, state, and federal government agency comments on the proposal are included. Preliminary findings and conclusions are presented on: (a) conformity to the forecast of statewide and service area electric power demands; (b) the degree to which the proposed site and facility conform with applicable local, regional, state, and federal standards, ordinances and laws; (c) the safety and reliability of the facility; and (d) the relative merit of the proposed transmission line corridors. (MHR)

  12. Two Project Methods: Preliminary Observations on the Similarities and Differences between William Heard Kilpatrick's Project Method and John Dewey's Problem-Solving Method

    Science.gov (United States)

    Sutinen, Ari

    2013-01-01

    The project method became a famous teaching method when William Heard Kilpatrick published his article "Project Method" in 1918. The key idea in Kilpatrick's project method is to try to explain how pupils learn things when they work in projects toward different common objects. The same idea of pupils learning by work or action in an…

  13. 77 FR 40354 - Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-07-09

    ... Energy Regulatory Commission Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application..., 2012, Mesa De Los Carros Hydro, LLC filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Mesa De Los Carros Pumped Storage Project to...

  14. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  15. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  16. Preliminary design of a coffee harvester

    Directory of Open Access Journals (Sweden)

    Raphael Magalhães Gomes Moreira

    2016-10-01

    Full Text Available Design of an agricultural machine is a highly complex process due to interactions between the operator, machine, and environment. Mountain coffee plantations constitute an economic sector that requires huge investments for the development of agricultural machinery to improve the harvesting and post-harvesting processes and to overcome the scarcity of work forces in the fields. The aim of this study was to develop a preliminary design for a virtual prototype of a coffee fruit harvester. In this study, a project methodology was applied and adapted for the development of the following steps: project planning, informational design, conceptual design, and preliminary design. The construction of a morphological matrix made it possible to obtain a list of different mechanisms with specific functions. The union between these mechanisms resulted in variants, which were weighed to attribute scores for each selected criterion. From each designated proposal, two variants with the best scores were selected and this permitted the preparation of the preliminary design of both variants. The archetype was divided in two parts, namely the hydraulically articulated arms and the harvesting system that consisted of the vibration mechanism and the detachment mechanism. The proposed innovation involves the use of parallel rods, which were fixed in a plane and rectangular metal sheet. In this step, dimensions including a maximum length of 4.7 m, a minimum length of 3.3 m, and a total height of 2.15 m were identified based on the functioning of the harvester in relation to the coupling point of the tractor.

  17. Preliminary design and thermal analysis of device for finish cooling Jaffa biscuits in a.d. 'Jaffa'- Crvenka

    Directory of Open Access Journals (Sweden)

    Salemović Duško R.

    2015-01-01

    Full Text Available In this paper preliminary design of device for finish cooling chocolate topping of biscuits in A.D. 'Jaffa'- Crvenka was done. The proposed preliminary design followed by the required technological process of finish cooling biscuits and required parameters of process which was supposed to get and which represented part of project task. Thermal analysis was made and obtained percentage error between surface contact of the air and chocolate topping, obtained from heat balance and geometrical over proposed preliminary design, wasn't more than 0.67%. This is a preliminary design completely justified because using required length of belt conveyor receive required temperature of chocolate topping at the end of the cooling process.

  18. The proposed Diagnostic Instrumentation and Analysis Laboratory, Mississippi State University

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The Department of Energy (DOE) proposes to authorize Mississippi State University (MSU) to proceed with the detailed design, construction and equipping of the proposed Diagnostic Instrumentation and Analysis Laboratory (DIAL). DOE grant funds are available to the University for the limited purpose of performing preliminary studies, including analysis necessary to conduct this environmental assessment. The proposed facility would be located in the Mississippi Research and Technology Park, adjacent to the Mississippi Agriculture and Forestry Experiment Station campus in Starkville, Mississippi. Total project cost is estimated at $7,953,600. This proposed laboratory would be designed to conduct research into combustion devices related to waste management and environmental restoration that is of importance to industry and government. The proposed facility`s role would be to develop diagnostic instrumentation capabilities in the area of combustion and related processes.

  19. Outline for a human-based assessment methodology of urban projects. The case of Polis Gondomar

    Directory of Open Access Journals (Sweden)

    Paolo Marcolin

    2015-06-01

    Full Text Available This paper presents the results of a preliminary research project proposing an assessment methodology for the actual impacts of urban projects on city development[1]. At this stage, the research has focused on the identification of indicators about the success of urban projects according to the accomplishment, functioning and use of public spaces. A case study is presented as a means for exploring these indicators: the intervention made by the Polis Programme at Gondomar.

  20. Risk assessment of CST-7 proposed waste treatment and storage facilities Volume I: Limited-scope probabilistic risk assessment (PRA) of proposed CST-7 waste treatment & storage facilities. Volume II: Preliminary hazards analysis of proposed CST-7 waste storage & treatment facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sasser, K.

    1994-06-01

    In FY 1993, the Los Alamos National Laboratory Waste Management Group [CST-7 (formerly EM-7)] requested the Probabilistic Risk and Hazards Analysis Group [TSA-11 (formerly N-6)] to conduct a study of the hazards associated with several CST-7 facilities. Among these facilities are the Hazardous Waste Treatment Facility (HWTF), the HWTF Drum Storage Building (DSB), and the Mixed Waste Receiving and Storage Facility (MWRSF), which are proposed for construction beginning in 1996. These facilities are needed to upgrade the Laboratory`s storage capability for hazardous and mixed wastes and to provide treatment capabilities for wastes in cases where offsite treatment is not available or desirable. These facilities will assist Los Alamos in complying with federal and state requlations.

  1. 中国西部战略调水初探%Preliminary Study on Strategic Water Transfe r Project in Western China

    Institute of Scientific and Technical Information of China (English)

    WU; Li-gong

    2001-01-01

    Strategic Water Transfer Project of Western China will tra nsfer water from the Dadu river, the Yalong river, the Jinsha river, the Lancang river and the Nujiang river to the Daliushu project as head work of main canal on the Yell ow river. And then,the water will be diverted to Neimongol and Xinjiang Uygur au tonomous regions,with transfered annual volume of water 80 billion m3. The pro ject posse sses great comprehensive benefit. The construction of the project will not only ch ange the appearance of the whole Northwest China, but also open up a wide way fo r the sustainable development of China in future.

  2. Cultural Resources Survey, Harry S. Truman Dam and Reservoir Project, Missouri. Volume 9. Preliminary Studies of Early and Middle Archaic Components.

    Science.gov (United States)

    1983-02-01

    sults of preliminary testing at several sites in the lower Pomme de Terre River valley. Volume VIII contains the results of excavations in rock shelters...Griffin and Michael K. Trimble, pp. 269- 349 Volume VI: EURO-AMERICAN SETTLEMENT OF THE LOWER POMME DE TERRE RIVER VALLEY, by Russell L. Miller. 75 pp...Soils and Soil-Geomorphic Investigations in ’TIC the Lower Pomme de Terre Valley, by Donale DI Lee Johnson, pp. 59-139 Dp16trA’ iDiSt ’ _ /’.V

  3. Proposed methodology for completion of scenario analysis for the Basalt Waste Isolation Project. [Assessment of post-closure performance for a proposed repository for high-level nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Plum, R.J.; Visca, P.J.

    1984-11-01

    This report presents the methodology to complete an assessment of postclosure performance, considering all credible scenarios, including the nominal case, for a proposed repository for high-level nuclear waste at the Hanford Site, Washington State. The methodology consists of defensible techniques for identifying and screening scenarios, and for then assessing the risks associated with each. The results of the scenario analysis are used to comprehensively determine system performance and/or risk for evaluation of compliance with postclosure performance criteria (10 CFR 60 and 40 CFR 191). In addition to describing the proposed methodology, this report reviews available methodologies for scenario analysis, discusses pertinent performance assessment and uncertainty concepts, advises how to implement the methodology (including the organizational requirements and a description of tasks) and recommends how to use the methodology in guiding future site characterization, analysis, and engineered subsystem design work. 36 refs., 24 figs., 1 tab.

  4. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  5. Scope of the environmental assessment for the proposed PanCanadian Petroleum Limited (PanCanadian) Deep Panuke Gas Development Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-12-18

    PanCanadian's Deep Panuke Gas Development Project offshore from Nova Scotia is scheduled for environmental assessment. The scope of the assessment will include the operation, decommissioning and abandonment of the existing Panuke jacket as well as the construction, operation, decommissioning and abandonment of three new bottom-founder platforms that hold the gas processing system. The assessment will then include the offshore gas processing system along with its separation, measurement, dehydration and hydrocarbon dew point control equipment as well as its full acid gas processing system that removes hydrogen sulphide and carbon dioxide from raw gas. The underwater pipelines and onshore facilities are included in the assessment which will consider the following issues as described in the Canadian Environmental Assessment Act: (1) the environmental effects of the project, including effects of accidents that may occur, (2) the significance of the environmental effects, (3) comments from the public, and (4) measures that are technically and economically viable and that would mitigate any major adverse environmental effects of the project. The assessment should also consider the need for the project and any alternatives to the project. 1 tab.

  6. DECOVALEX-THMC Project. Task A. Influence of near field coupled THM phenomena on the performance of a spent fuel repository. Report of Task A1: Preliminary scoping calculations

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Son (ed.) [Canadian Nuclear Safety Commission (Canada); Lanru Jing (ed.) [Royal Institute of Technology, Stockholm (Sweden); Boergesson, Lennart [Clay Technology AB, Lund (Sweden); Chijimatzu, Masakazu [Hazama Corporation (Japan); Jussila, Petri [Helsinki Univ. of Technology, Helsinki (Finland); Rutqvist, Jonny [Lawrence Berkeley National Laboratory CA (United States)

    2007-02-15

    The DECOVALEX-THMC project is an ongoing international co-operative project that was stared in 2004 to support the development of mathematical models of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological media for siting potential nuclear fuel waste repositories. The general objective is to characterise and evaluate the coupled THMC processes in the near field and far field of a geological repository and to assess their impact on performance assessment: - during the three phases of repository development: excavation phase, operation phase and post-closure phase; - for three different rocks types: crystalline, argillaceous and tuff; - with specific focus on the issues of: Excavation Damaged Zone (EDZ), permanent property changes of rock masses, and glaciation and permafrost phenomena. The project involves a large number of research teams supported by radioactive waste management agencies or governmental regulatory bodies in Canada, China, Finland, France, Germany, Japan, Sweden and USA, who conducted advanced studies and numerical modelling of coupled THMC processes under five tasks. This report presents the definition of the first phase, Task A-1, of the Task A of the project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the phenomena and material properties that must be better understood in subsequent phases. Many simplifications and assumptions were introduced and the results should be considered under these assumptions. Based on the evaluation of the multiple teams' results, a few points of concern were identified that may guide the successive phases of Task A studies: 1. The predicted maximum total stress in the MX-80 bentonite could slightly exceed the 15 MPa design pressure for the

  7. Monobuoy monitoring system - project, installation and preliminary results; Sistema de monitoracao de monoboias maritimas - desenvolvimento, instalacao e analise preliminar de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Daniel L.; Machado Filho, Remo Z. [PETROBRAS, Rio de Janeiro, RJ (Brazil). Centro de Pesquisas; Medeiros Junior, Adory J. [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    A monobuoy monitoring system was developed and installed on 2004 in two oil terminals of TRANSPETRO. The main purpose of this system is to assure that monobuoys will be assisted during offloading operations, which will reduce the risk of accidents and detect immediately damages on mooring lines and equipment. The system comprises a Control Module on terminal site and a Remote Monitoring Unit, installed on each monobuoy. The link between modules is provided by an UHF radio-modem. The parameters acquired are pitch, roll, heave, geographic position, internal variables, and, if available, pressure and temperature of lines, traction on mooring system, etc. Positioning information is processed by the PETRONAV Positioning System. The whole process is registered and monitored on terminal with graphical interface. This article describes the development and installation of the system and the preliminary analysis of data produced since the system was installed. (author)

  8. The Mechanical Design and Preliminary Testing Results of Beam Position Monitors for the LANSCE Isotope Production Facility and Switchyard Kicker Projects

    Science.gov (United States)

    O'Hara, J. F.; Gilpatrick, J. D.; Ledford, J. E.; Shurter, R. B.; Roybal, R. J.; Bentley, B. E.

    2002-12-01

    The Los Alamos Neutron Science Center (LANSCE-1) Beam Diagnostic Team is providing Beam Position Monitors (BPMs) to the LANSCE Facility for use in two on-going projects: The Isotope Production Facility (IPF) and The Switchyard Kicker Upgrade (SYK). The BPM designs for both projects are very similar. The BPMs are classic, four, micro-stripline units having one end terminated in a 50-ohm load. This paper will discuss the position measurement requirements, mechanical design, fabrication, and alignment issues encountered for both sets of BPMs, as well as report the results obtained from the initial taught wire testing of the IPF BPMs.

  9. Writing successful UX proposals

    CERN Document Server

    Hass, Chris

    2016-01-01

    Bringing new project funding and business opportunities to your organization is a vital part of UX professionals' growth and success. Writing Successful UX Proposals teaches the proven techniques for assessing proposal requests, writing successful commercial and government funding proposals, and enhancing your business development skills. This book will teach UX practitioners how to succeed in UX business development by mastering the following goals: * Understand how to assess a request for proposals* Understand the "anatomy" of a proposal response * Speak the business language of those who will be evaluating the proposed approach* Recognize the successes of others and build upon their advice Complete with case studies, tricks and tips, and real-world examples throughout, this is a must-have resource for UX professionals interested in honing their proposal writing skills and setting themselves up for success. * Provides unique sales and proposal writing insights tailored to the UX arena (including both resear...

  10. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  11. Preliminary analysis of construction investment estimation on petrochemical project%浅析石油化工项目建设投资估算

    Institute of Scientific and Technical Information of China (English)

    陈瑜芳

    2011-01-01

    石油化工项目的建设投资估算是项目前期工作的重要内容之一.在分析石油化工项目的特点、说明投资估算的重要性和范围的基础上,提出投资估算编制应注重资料搜集、制定投资估算原则、编制方法及确定工程量等环节.并分析说明了如何根据项目的具体情况,选取适当的估算方法完成项目投资估算.最终提出了投资估算中应注意的问题.%The construction investment estimation of petrochemical project is one of important work activities in the early stage of project. On the basis of analysis of the characteristics of petroleum refining and petrochemical engineering projects and the importance of investment estimation and its scope, the investment estimate preparation should focus on such steps as data collection, development of investment estimation method and principles and determination of bill of quantities, etc. An example is provided to illustrate how to select a proper estimation method to perform the investment estimate according to specific project conditions. The precautions in capital investment estimation are finally presented.

  12. Proposal of a new model to improve the collection of small WEEE: a pilot project for the recovery and recycling of toys.

    Science.gov (United States)

    Solé, Miquel; Watson, Jenna; Puig, Rita; Fullana-i-Palmer, Pere

    2012-11-01

    A new collection model was designed and tested in Catalonia (Spain) to foster the separate collection and recycling of electrical and electronic toys, with the participation of selected primary and secondary schools, as well as waste collection points and municipalities. This project approach is very original and important because small household WEEE has low rates of collection (16-21% WEEE within the EU or 5-7% WEEE in Spain) and no research on new approaches to enhance the collection of small WEEE is found in the literature. The project was successful in achieving enhanced toys collection and recycling rates, which went up from the national Spanish average of 0.5% toys before the project to 1.9 and 6% toys during the two project years, respectively. The environmental benefits of the campaign were calculated through a life-cycle approach, accounting for the avoided impact afforded by the reuse of the toys and the recycling of the valuable materials contained therein (such as metals, batteries and circuit boards) and subtracting the additional environmental burdens associated with the establishment of the collection campaign.

  13. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal - Appendix)

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    The main objective of the Port Neches Project was to determine the feasibility and producibility of CO2 miscible flooding techniques enhanced with horizontal drilling applied to a Fluvial Dominated Deltaic reservoir. The second was to disseminate the knowledge gained through established Technology Transfer mechanisms to support DOE's programmatic objectives of increasing domestic oil production and reducing abandonment of oil fields.

  14. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  15. YFNWR project report number 86-4: The feasibility of a proposed study to estimate beaver abundance on the Yukon Flats National Wildlife Refuge: Management study

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A survey was conducted for the Yukon Flats National Wildlife Refuge (YFNWR) in summer 1985 to assess the feasibility of a proposed study to estimate beaver colony...

  16. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions f...

  17. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...

  18. Alleged Leakage of CO2 from the Weyburn-Midale CO2 Monitoring and Storage Project: Preliminary Findings from Implementation of the IPAC-CO2 Incident Response Protocol

    Science.gov (United States)

    Sherk, G. W.; Romanak, K.; Gilfillan, S. M.; Dale, J. E.; Wolaver, B. D.; Yang, C.

    2011-12-01

    In January of 2011, the owners of property located in the southwest portion of the Weyburn-Midale Unit in Saskatchewan, Canada, alleged that CO2 injected as part of the Weyburn-Midale CO2 Monitoring and Storage Project was leaking from their property. Prior to the property owners' allegations, the International Performance Assessment Centre for Geologic Storage of Carbon Dioxide (IPAC-CO2) had initiated development of an incident response protocol to be implemented when allegations arose of unintentional releases of anthropogenic CO2 from carbon capture and storage projects. IPAC-CO2 implemented this protocol to determine if CO2 concentrations as high as 11% result from an unintentional release of anthropogenic CO2 or if they form naturally from microbial CO2 production in the organic-rich wet environment that characterizes the property. This paper presents preliminary findings resulting from implementation of the IPAC-CO2 incident response protocol. Particular attention is paid to the results of both soil-gas and noble gas analyses.

  19. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  20. A Preliminary Assessment of the Cultural Resources within the Millican Project, Navasota River Basin, Brazos, Grimes, Leon, Madison and Robertson Counties, Texas. Reports of Investigations, Number 19.

    Science.gov (United States)

    1982-02-01

    SPANISH SETTLEMENT IN THE VICINITY OF THE PROJECT AREA Pilar de Bucareli , a settlement for exiles from Los Adais Mission near Natchitoches, Louisiana was...believed to have been located near Robbin’s Ferry at Randolph in Madison County (Bolton 1970:406). Bucareli was established to help the Spanish in at least...Gulf of Mexico (Bolton 1970:407). Not all of these well-intentioned goals were realized. Bucareli was populated and remained in existence under the