WorldWideScience

Sample records for preliminary project proposal

  1. Preliminary methodological proposal for estimating environmental flows in projects approved by the ministry of environment and sustainable development (MADS), Colombia

    International Nuclear Information System (INIS)

    Pinilla Agudelo, Gabriel A; Rodriguez Sandoval, Erasmo A; Camacho Botero, Luis A

    2014-01-01

    A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA) in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogota (UNC). The proposed method begins with an evaluation of hydrological criteria, continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macro invertebrates, riparian vegetation, and fish). The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS.

  2. PRELIMINARY METHODOLOGICAL PROPOSAL FOR ESTIMATING ENVIRONMENTAL FLOWS IN PROJECTS APPROVED BY THE MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (MADS, COLOMBIA

    Directory of Open Access Journals (Sweden)

    Gabriel A. Pinilla Agudelo

    2014-01-01

    Full Text Available ABSTRACT A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogotá (UNC. The proposed method begins with an evaluation of hydrological criteria,continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macroinvertebrates, riparian vegetation, and fish. The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS. RESUMEN Se presenta una propuesta metodológica para estimar los caudales ambientales en grandes proyectos licenciados por la Agencia Nacional de Licencias Ambientales (ANLA de Colombia, resultado de un convenio interadministrativo suscrito entre el ahora Ministerio de Ambiente y Desarrollo Sostenible (MADS de Colombia y la Universidad Nacional de Colombia, Bogotá (UNC. El método propuesto parte de garantizar criterios hidrológicos, continúa con una validación hidráulica y de calidad del agua, sigue con la determinación de la integridad del hábitat, en un proceso iterativo que requiere evaluación para las condiciones antes y después de la construcción del proyecto y que permite establecer un caudal que, además de conservar las funciones ecológicas del río, garantiza los usos del recurso aguas abajo. Espec

  3. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  4. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  5. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  6. Project Rulison: A preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Miles Jr [Austral Oil Company Incorporated, Houston, TX (United States); Bray, Bruce G; Mann, Robert L [CER Geonuclear Corporation, Las Vegas, NV (United States)

    1970-05-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Rulison Field in Garfield County, Colorado. Since discovery in 1952, this reservoir has been tested by nine widely-spaced conventionally completed wells. A method of stimulation, far greater in magnitude and efficiency than conventional hydraulic fracturing, is needed to recover this gas at economic rates. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90-125 billion cubic feet per 640 acres from earlier wells, was confirmed from information obtained on two conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas flow computer model. A nuclear explosive with a design yield of 40 kilotons was emplaced in a 10-3/4 inch hole at a depth of 8426 feet below ground surface and detonated on September 10, 1969. A preliminary appraisal of the data taken at shot time indicate that the explosive behaved as predicted. The explosion was completely contained underground as predicted and no major seismic damage occurred. The post-shot drilling program, to reenter the chimney, will congruence in March 1970, approximately six months after detonation. A test program will be initiated at that time to determine the degree of reservoir stimulation achieved. (author)

  7. Preliminary Study of the Effect of the Proposed Long Lake Valley Project Operation on the Transport of Larval Suckers in Upper Klamath Lake, Oregon

    Science.gov (United States)

    Wood, Tamara M.

    2009-01-01

    A hydrodynamic model of Upper Klamath and Agency Lakes, Oregon, was used to explore the effects of the operation of proposed offstream storage at Long Lake Valley on transport of larval suckers through the Upper Klamath and Agency Lakes system during May and June, when larval fish leave spawning sites in the Williamson River and springs along the eastern shoreline and become entrained in lake currents. A range in hydrologic conditions was considered, including historically high and low outflows and inflows, lake elevations, and the operation of pumps between Upper Klamath Lake and storage in Long Lake Valley. Two wind-forcing scenarios were considered: one dominated by moderate prevailing winds and another dominated by a strong reversal of winds from the prevailing direction. On the basis of 24 model simulations that used all combinations of hydrology and wind forcing, as well as With Project and No Action scenarios, it was determined that the biggest effect of project operations on larval transport was the result of alterations in project management of the elevation in Upper Klamath Lake and the outflow at the Link River and A Canal, rather than the result of pumping operations. This was because, during the spring time period of interest, the amount of water pumped between Upper Klamath Lake and Long Lake Valley was generally small. The dominant effect was that an increase in lake elevation would result in more larvae in the Williamson River delta and in Agency Lake, an effect that was enhanced under conditions of wind reversal. A decrease in lake elevation accompanied by an increase in the outflow at the Link River had the opposite effect on larval concentration and residence time.

  8. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  9. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  10. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  11. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  12. Project Rulison: a preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M Jr; Bray, B G; Mann, R L

    1970-01-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Tuli Rulison field in Garfield County, Colorado. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90 to 125 billion cu ft per 640 acres from earlier wells, was confirmed from information obtained on 2 conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas-flow computer model. (20 refs.)

  13. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  14. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  15. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-05

    ... Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in.... The proposed project would consist of: (1) 4 OCGen\\TM\\ hydrokinetic tidal devices each consisting of...

  16. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  17. REMUS: Preliminary concept and implementation proposal

    International Nuclear Information System (INIS)

    Bustorff, U.

    1992-01-01

    In the light of the constantly increasing use of waterways, the associated risk of maritime accidents and accidental or deliberate discharge of pollutants at sea and in coastal areas, it is necessary to adopt effective pollution prevention and combating measures coordinated at national and international level so as to guarantee the safety of shipping and maintain the integrity of the maritime environment. These measures must be equally effective for accidents as for discharges of crude oil and petroleum products, chemicals, etc. so that rapid expert action can be taken in order to minimize the effects on shipping safety and on the maritime and coastal environment and also to limit consequent financial costs. This study presents a concept for increasing the effectiveness of the authorities and special agencies of the German Federal Government and coastal states which are responsible for these tasks (in particular the Operations Management Group (ELG) and the North Sea/Baltic sea Emergency Staffs (EmStaffs)) by implementing a open-quotes Computer-Based Maritime Accident Management Systemclose quotes (REMUS). The REMUS concept comprises the following two main functions for effective maritime accident management: Acquisition, storage and intelligent availability of the largest possible quantity of relevant data for accident prevention. Provision of automatic decision support, adapted to the individual situation, for use by the authorities involved during the operational phase. REMUS provides support for the maritime emergency experts in collecting data and information and generates proposals for measures to be initiated according to the prevailing circumstances. REMUS integrates perfectly, both organizationally and technically, with currently employed methods and procedures for pollution prevention

  18. The CUORE/CUORICINO project: preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 420 kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.) The scale of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project are briefly discussed [ru

  19. The CUORE/CUORICINO project: Preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 42-kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.). The state of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project, is briefly discussed

  20. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  1. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14290-000] Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...), proposing to study the feasibility of the Porcupine Dam Hydropower Project to be located on the East Fork of...

  2. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  3. Caribbean alternative energy programme project proposals

    International Nuclear Information System (INIS)

    1978-03-01

    This is the third report to follow the Project Group Meeting on ALTERNATIVE ENERGY RESOURCES, Barbados, September, 1977. It consists of summaries of projects proposals identified at the Meeting. The first two reports have been previously circulated. The first CSC(77)AER-1 covers the background, proceedings and recommendations resulting from the meeting as well as containing a brief outline of the project proposals. The country papers and technical papers that were presented at the meeting or served as background material, form the second report, CSC(77)AER-2. Copies of the first two reports can be obtained on request to the Commonwealth Science Council. Projects with potential for making significant progress in the short term have been marked with an asterisk

  4. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  5. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  6. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  7. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  8. Preliminary results on the cryogenic target for FIREX project

    International Nuclear Information System (INIS)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-01-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (about 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Liquid fuel is fed into the shell by the feeder and is soaked up by the foam material through capillarity. The fuel is then solidified. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H 2 liquefaction using a dummy target instead of the foam target. Judging from these results, the target assembled in the same process as the dummy target is sure to be practicable for the FIREX project. (authors)

  9. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  10. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  11. Linear accelerator-breeder (LAB): a preliminary analysis and proposal

    International Nuclear Information System (INIS)

    1976-01-01

    The development and demonstration of a Linear Accelerator-Breeder (LAB) is proposed. This would be a machine which would use a powerful linear accelerator to produce an intense beam of protons or deuterons impinging on a target of a heavy element, to produce spallation neutrons. These neutrons would in turn be absorbed in fertile 238 U or 232 Th to produce fissile 239 Pu or 233 U. Though a Linear Accelerator-Breeder is not visualized as competitive to a fast breeder such as the LMFBR, it would offer definite benefits in improved flexibility of options, and it could probably be developed more rapidly than the LMFBR if fuel cycle problems made this desirable. It is estimated that at a beam power of 300 MW a Linear Accelerator-Breeder could produce about 1100 kg/year of fissile 239 Pu or 233 U, which would be adequate to fuel from 2,650 to 15,000 MW(e) of fission reactor capacity depending on the fuel cycle used. A two-year design study is proposed, and various cost estimates are presented. The concept of the Linear Accelerator-Breeder is not new, having been the basis for a major AEC project (MTA) a number of years ago. It has also been pursued in Canada starting from the proposal for an Intense Neutron Generator (ING) several years ago. The technical basis for a reasonable design has only recently been achieved. The concept offers an opportunity to fill an important gap that may develop between the short-term and long-term energy options for energy security of the nation

  12. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  13. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  14. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  15. Proposed Fermilab upgrade main injector project

    International Nuclear Information System (INIS)

    1992-04-01

    The US Department of Energy (DOE) proposes to construct and operate a ''Fermilab Main Injector'' (FMI), a 150 GeV proton injector accelerator, at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The purpose and need for this action are given of this Environmental Assessment (EA). A description of the proposed FMI and construction activities are also given. The proposed FMI would be housed in an underground tunnel with a circumference of approximately 2.1 miles (3.4 kilometers), and the construction would affect approximately 135 acres of the 6,800 acre Fermilab site. The purpose of the proposed FMI is to construct and bring into operation a new 150 GeV proton injector accelerator. This addition to Fermilab's Tevatron would enable scientists to penetrate ever more deeply into the subatomic world through the detection of the super massive particles that can be created when a proton and antiproton collide head-on. The conversion of energy into matter in these collisions makes it possible to create particles that existed only an instant after the beginning of time. The proposed FMI would significantly extend the scientific reach of the Tevatron, the world's first superconducting accelerator and highest energy proton-antiproton collider

  16. 78 FR 39829 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...: Title: Reporting of Nonpayroll Withheld Tax Liabilities. OMB Number: 1545-1413. Regulation Project...

  17. Future perspectives - proposal for Oxford Physiome Project.

    Science.gov (United States)

    Oku, Yoshitaka

    2010-01-01

    The Physiome Project is an effort to understand living creatures using "analysis by synthesis" strategy, i.e., by reproducing their behaviors. In order to achieve its goal, sharing developed models between different computer languages and application programs to incorporate into integrated models is critical. To date, several XML-based markup languages has been developed for this purpose. However, source codes written with XML-based languages are very difficult to read and edit using text editors. An alternative way is to use an object-oriented meta-language, which can be translated to different computer languages and transplanted to different application programs. Object-oriented languages are suitable for describing structural organization by hierarchical classes and taking advantage of statistical properties to reduce the number of parameter while keeping the complexity of behaviors. Using object-oriented languages to describe each element and posting it to a public domain should be the next step to build up integrated models of the respiratory control system.

  18. Lunar scout: A Project Artemis proposal

    Science.gov (United States)

    The results of a student project to design a lunar lander in the context of a specifically defined mission are presented. The Lunar Scout will be launched from Cape Canaveral, Florida onboard a Delta II launch vehicle. The Delta II will carry the lander and its payload to a 1367 km orbit. Once it reaches that altitude, a STAR 48A solid rocket motor will kick the spacecraft into a lunar trajectory. After burnout of the lunar insertion motor, it will be jettisoned from the spacecraft. The flight from the earth to the moon will take approximately 106.4 hours. During this time the battery, which was fully charged prior to launch, will provide all power to the spacecraft. Every hour, the spacecraft will use its sun sensors and star trackers to update its position, maintain some stabilization and relay it back to earth using the dipole antennas. At the start of its lunar trajectory, the spacecraft will fire one of its 1.5 N thrusters to spin in at a very small rate. The main reason for this is to prevent one side of the spacecraft from overheating in the sun. When the spacecraft nears the moon, it will orient itself for the main retro burn. At an altitude of 200 km, a 4400 N bipropellant liquid thruster will ignite to slow the spacecraft. During the burn, the radar altimeter will be turned on to guide the spacecraft. The main retro rocket will slow the lander to 10 m/s at an approximate altitude of 40 km above the moon. From there, the space craft will use four 4.5 N hydrazine vertical thrusters and 1.5 N horizontal thrusters to guide the spacecraft to a soft landing. Once on the ground, the lander will shutoff the radar and attitude control systems. After the debris from the impact has settled, the six solar panels will be deployed to begin recharging the batteries and to power up the payload. The feedhorn antenna will then rotate to fix itself on the earth.

  19. Proposed preliminary definition of the disturbed-zone boundary appropriate for a repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Langkopf, B.S.

    1987-12-01

    Some of the calculations that support the licensing of a repository for high-level radioactive waste will use the regulatory concept of a disturbed zone. The Nevada Nuclear Waste Storage Investigations (NNWSI) project must determine the location of the boundary of the disturbed zone for use in these calculations. This paper summarizes results of computer analyses and laboratory experiments and suggests a preliminary definition for the boundary of the disturbed zone for the unsaturated environment at Yucca Mountain. Although the intent of this paper is to define the boundary of the disturbed zone at the edge of significant changes in intrinsic hydrologic properties, there is no evidence of changes in intrinsic hydrologic properties that could significantly change the groundwater travel time from the repository to the water table. Such a result suggests that the disturbed zone at Yucca Mountain is of minimal extent. Because the analyses and experiments reviewed here indicate that there are a variety of changes near the waste package and because the results are subject to uncertainty, the preliminary suggestion for the extent of the disturbed zone is a value larger than the results themselves would suggest: the boundary is proposed to be a plane 10 m below the lower boundary of the waste packages. 88 refs., 12 figs., 5 tabs

  20. Ambient Assisted Living and ageing: preliminary results of RITA project.

    Science.gov (United States)

    Aquilano, Michela; Cavallo, Filippo; Bonaccorsi, Manuele; Esposito, Raffaele; Rovini, Erika; Filippi, Massimo; Esposito, Dario; Dario, Paolo; Carrozza, Maria Chiara

    2012-01-01

    The ageing of population is a social phenomenon that most of worldwide countries are facing. They are, and will be even more in the future, indeed trying to find solutions for improving quality of life of their elderly citizens. The project RITA wants to demonstrate that an update of the current socio-medical services with an Ambient Assisted Living (AAL) approach could improve the service efficiency and the quality of life of both elderly and caregiver. This paper presents the preliminary results obtained in RITA.

  1. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  2. 78 FR 23975 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-23

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... definition of a controlled foreign corporation, foreign base company income and foreign personal holding...

  3. 76 FR 43381 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-07-20

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Financial Asset Securitization Investment Trusts; Real Estate Mortgage Investment Conduits (TD 9004 (final...

  4. 78 FR 39830 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... the Ozone Layer and on Products Containing Such Chemicals. OMB Number: 1545-1153. Regulation Project...

  5. 78 FR 70100 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-22

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Nuclear Power Plant. OMB Number: 1545-1378. Regulation Project Number: TD 8580. Abstract: This regulation...

  6. 78 FR 76893 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments.... Regulation Project Number: REG-209626-93 (TD 8796). Abstract: These regulations provide guidance concerning...

  7. 78 FR 45614 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-29

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... GST Deemed Allocations. OMB Number: 1545-1892. Regulation Project Number: REG-153841-02 (TD 9208...

  8. 78 FR 66424 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [IA-33-92] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... Project Number: IA-33-92. Abstract: Section 6050H of the Internal Revenue Code relates to the information...

  9. 78 FR 66423 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [TD 9057, TD 9154, TD 9187] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Rules. OMB Number: 1545-1774. Regulation Project Number: TD 9057, TD 9154, and TD 9187. Abstract: The...

  10. 75 FR 2932 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-116664-01] RIN 1545-BC15 Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION.... OMB Number: 1545-1868. Regulation Project Number: REG-116664-01 (TD 9300 (final)). Abstract: This...

  11. 78 FR 76892 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Liabilities for Pension Funding Purposes. OMB Number: 1545-2095. Regulation Project Number: REG-139236-07 (TD...

  12. 75 FR 2930 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-106446-98] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... From Joint and Several Liability. OMB Number: 1545-1719. Regulation Project Number: REG-106446-98...

  13. 76 FR 74117 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-30

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Number: 1545-0817. Regulation Project Number: EE-28-78 (TD 7845). Abstract: Internal Revenue Code section...

  14. 76 FR 19875 - Migratory Bird Hunting; Proposed 2011-12 Migratory Game Bird Hunting Regulations (Preliminary...

    Science.gov (United States)

    2011-04-08

    ..., carriage, or export of any * * * bird, or any part, nest, or egg'' of migratory game birds can take place... 50 CFR Part 20 Migratory Bird Hunting; Proposed 2011-12 Migratory Game Bird Hunting Regulations (Preliminary) With Requests for Indian Tribal Proposals and Requests for 2013 Spring and Summer Migratory Bird...

  15. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  16. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  17. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  18. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  19. 75 FR 27143 - Migratory Bird Hunting; Proposed 2010-11 Migratory Game Bird Hunting Regulations (Preliminary...

    Science.gov (United States)

    2010-05-13

    ... Convention and the subsequent 1936 Mexico Convention for the Protection of Migratory Birds and Game Mammals... Part III Department of the Interior Fish and Wildlife Service 50 CFR Part 20 Migratory Bird Hunting; Proposed 2010-11 Migratory Game Bird Hunting Regulations (Preliminary) With Requests for Indian...

  20. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  1. 78 FR 26694 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of the Treasury, as part of its continuing effort to reduce paperwork and...

  2. 78 FR 28703 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-15

    ... requirements that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...

  3. 75 FR 28331 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-05-20

    ... that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service [INTL-955-86] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and...

  4. Proposed Casey's Pond Improvement Project, Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the impacts associated with the proposed Casey's Pond Improvement Project at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The improvement project would maximize the efficiency of the Fermilab Industrial Cooling Water (ICW) distribution system, which removes (via evaporation) the thermal load from experimental and other support equipment supporting the high energy physics program at Fermilab. The project would eliminate the risk of overheating during fixed target experiments, ensure that the Illinois Water Quality Standards are consistently achieved and provide needed additional water storage for fire protection. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required

  5. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  6. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  7. Proposed REDD+ project for the Sundarbans: Legal and institutional issues

    Directory of Open Access Journals (Sweden)

    Saiful Karim

    2013-07-01

    Full Text Available Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM Sundarbans Project’ (CRISP to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

  8. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  9. Citizens' views about the proposed Hartsville Nuclear Power Plant: a preliminary report of potential social impacts

    International Nuclear Information System (INIS)

    Schuller, C.R.; Fowler, J.R.; Mattingly, T.J. Jr.; Sundstrom, E.; Lounsbury, J.; Passino, E.M.; Dowell, D.A.; Hutton, B.J.

    1975-05-01

    Preliminary results of a survey of public attitudes toward a proposed nuclear power plant facility at Hartsville, Tennessee are summarized. The purpose of the study was to aid in developing better methods for understanding the social consequences of energy facility development. The report is based on data obtained in interviews with 350 randomly selected respondents administered in Trousdale County, Tennessee during February 1975. (U.S.)

  10. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  11. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  12. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  13. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13995-000] Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 4, 2011, Mill Town Power Project filed an application for a...

  14. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13089-002] Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... study the feasibility of the Conway Ranch Hydropower Project to be located on Virginia Creek, near the...

  15. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  16. Preliminary identification of problem soils for infrastructure projects

    CSIR Research Space (South Africa)

    Paige-Green, P

    2008-11-01

    Full Text Available soils are those within the top 1.0m or 1.5m of the soil profile, a mechanism for evaluating these materials without preliminary filed work and testing would be invaluable. Since 1971, the Department of Agriculture has systematically mapped the soils...

  17. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  18. A preliminary social and economic assessment of the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Cluett, C.; Bolton, P.; York, K.; Wood, M.; Radford, L.

    1981-07-01

    This report provides a preliminary assessment of the social and economic impacts that could be caused by the construction and operation of a nuclear waste repository on the Hanford Site near Richland, Washington. This assessment involved assembling a comprehensive data base for the local Tri-Cities impact area and the surrounding region, establishing a network of local and regional contacts, making preliminary judgments about potential social impacts caused by the proposed repository, and recommending further research. This report concludes that growth effects under the anticipated work force scenario are expected to be relatively minor. With a strong public involvement program on the part of the project developers, including an ongoing dialogue with local and regional planners, potential socio-economic impacts can be anticipated and managed effectively. Specific recommendations are made for filling gaps in the available data, exploring key issues in more detail, and improving the analysis of social impacts. The report was prepared by the Battelle-Human Affairs Research Center in 1980 and 1981

  19. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    International Nuclear Information System (INIS)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10 9 electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE's National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE's evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc

  20. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  1. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    International Nuclear Information System (INIS)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations

  2. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    Energy Technology Data Exchange (ETDEWEB)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations. (DLC)

  3. Preliminary assessment of potential CDM early start projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

    2000-11-01

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest

  4. Preliminary Geological Survey on the Proposed Sites for the New Research Reactor

    International Nuclear Information System (INIS)

    Lim, In Cheol; Ha, J. J.; Oh, K. B.

    2010-12-01

    · Performing the preliminary geological survey on the proposed sites for the new research reactor through the technical service · Ordering a technical service from The Geological Society of Korea · Contents of the geological survey - Confirmation of active fault - Confirmation of a large-scale fracture zone or weak zone - Confirmation of inappropriate items related to the underground water - Confirmation of historical seismicity and instrumental earthquakes data · Synthesized analysis and holding a report meeting · Results of the geological survey - Confirmation of the geological characteristics of the sites and drawing the requirements for the precise geological survey in the future

  5. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 . The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF 6 -emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from solvent use and other sources is included

  6. The studsvik BNCT project: structure and the proposed protocols

    International Nuclear Information System (INIS)

    Capala, J.; Stenstam, B.H.; Skoeld, K.; Henriksson, R.; Salford, L.; Carlsson, J.

    2000-01-01

    The BNCT facility at Studsvik is now ready for clinical trials. Scientific operations of the Studsvik BNCT project are overseen by the Scientific Advisory Board comprised of representatives of all major universities in Sweden. Furthermore, special task groups for clinical and preclinical studies have been formed to facilitate collaboration with academia and to assure the quality of the research. Proposed clinical Phase II trials for glioblastoma are sponsored by the Swedish National Neuro-Oncology Group and, initially, will involve two protocols: Protocol no.1. BNCT for glioblastoma patients who have not received any therapy other than surgery (including stereotactic biopsy only). Protocol no.2. BNCT as a palliative treatment for patients with recurrent glioblastoma following conventional therapies or BNCT. In both protocols, BPA, administered by a 6 hour i.v. infusion, will be used as the boron delivery agent. (author)

  7. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  8. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Science.gov (United States)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  9. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Directory of Open Access Journals (Sweden)

    Romeli Norsyakilah

    2018-01-01

    Full Text Available As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  10. 76 FR 6153 - Supplemental Environmental Impact Statement for the Proposed Campo Regional Landfill Project on...

    Science.gov (United States)

    2011-02-03

    ... for the Proposed Campo Regional Landfill Project on the Campo Indian Reservation, San Diego County, CA... proposed Campo Regional Landfill Project (Proposed Action) to be located on the Campo Indian Reservation... Landfill Project (Proposed Action). There is no Federal action of amended lease and amended sublease...

  11. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  12. Preliminary report on the Northern California Power Agency's Notice of Intention to seek certification for NCPA Geothermal Project No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This preliminary report on the Northern California Power Agency (NCPA) geothermal power plant proposal has been prepared pursuant to California Public Resources Code Sections 25510, 25512, and 25540. It presents the preliminary Findings of fact and Conclusions adopted by the Commission Committee assigned to conduct proceedings on the Notice. In addition, the report contains a description of the proposed project, a summary of the proceedings to date, and local, state, and Federal government agency comments on the proposal. Finally, the report presents the Committee's view of those issues that require further consideration in future proceedings on the Notice. Pursuant to Public Resources Code Sections 25512 and 25540, the report presents preliminary Findings and Conclusions on: (1) conformity to the forecast of statewide and service area electric power demands; (2) the degree to which the proposed site and facility conform with applicable local, regional, state and Federal standards, ordinances, and laws; and (3) the safety and reliability of the facility.

  13. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13214-002; 14274-000] Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 12 Hydro Partners (Lock 12), and FFP Project 107 LLC (FFP 107) filed preliminary permit...

  14. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13213-002; 14271-000] Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 14 Hydro Partners (Lock 14), and FFP Project 106 LLC (FFP 106) filed preliminary permit...

  15. A Proposal to Build an Education Research and Development Program: The Kamehameha Early Education Project Proposal. Technical Report #3.

    Science.gov (United States)

    Gallimore, Ronald; And Others

    This report summarizes the programmatic features of a proposal for the Kamehameha Early Education Project (KEEP), a program aimed at the development, demonstration, and dissemination of methods for improving the education of Hawaiian and part-Hawaiian children. A brief description of the proposed project goals, structure, organization, and…

  16. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  17. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase of the proj......This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...

  18. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  19. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  20. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    and clarification of decision situations and consequences is rarely used in practice and structured reasoning about project and product performance when making decisions is also rare. In order to enhance the project managers’ understanding of decision-making in product development projects, the objective......A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business....... In product development projects it is desirable to reduce the level of uncertainty in order to make decisions without having to redo them later in the project resulting in longer lead time and higher costs. It is the project manager’s responsibility to manage this uncertainty in a complex ever...

  1. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  2. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  3. Preliminary shielding estimates for the proposed Oak Ridge National Laboratory (ORNL) Radioactive Ion Beam Facility (RIBF)

    International Nuclear Information System (INIS)

    Johnson, J.O.; Gabriel, T.A.; Lillie, R.A.

    1996-01-01

    The Oak Ridge National Laboratory (ORNL) has proposed designing and implementing a new target-ion source for production and injection of negative radioactive ion beams into the Hollifield tandem accelerator. This new facility, referred to as the Radioactive Ion Beam Facility (RIBF), will primarily be used to advance the scientific communities' capabilities for performing state-of-the-art cross-section measurements. Beams of protons or other light, stable ions from the Oak Ridge Isochronous Cyclotron (ORIC) will be stopped in the RIBF target ion source and the resulting radioactive atoms will be ionized, charge exchanged, accelerated, and injected into the tandem accelerator. The ORIC currently operates with proton energies up to 60 MeV and beam currents up to 100 microamps with a maximum beam power less than 2.0 kW. The proposed RIBF will require upgrading the ORIC to generate proton energies up to 200 MeV and beam currents up to 200 microamps for optimum performance. This report summarizes the results of a preliminary one-dimensional shielding analysis of the proposed upgrade to the ORIC and design of the RIBF. The principal objective of the shielding analysis was to determine the feasibility of such an upgrade with respect to existing shielding from the facility structure, and additional shielding requirements for the 200 MeV ORIC machine and RIBF target room

  4. Preliminary project of s Thomson scattering system for the ETE tokamak

    International Nuclear Information System (INIS)

    Berni, Luiz Angelo

    1997-01-01

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light

  5. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  6. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  7. Radionuclides measurements for the Phebus FP project - preliminary study

    International Nuclear Information System (INIS)

    Schuster, E.; Nopitsch, K.

    1989-09-01

    This report gives a review of proposed measurement techniques to measure quantitatively release and transport of fission products during and after fission product release tests. The measurement devices provided are for example gamma-spectrometers, scintillation counters and sampling vessels. The second part reviews the behaviour of fission product iodine under severe accident conditions and describes the iodine sampling system and the determination of iodine species in aqueous solutions

  8. Mid-Columbia coho reintroduction feasibility project. Preliminary environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC's Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan

  9. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  10. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  11. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  12. Preliminary radiation transport analysis for the proposed National Spallation Neutron Source (NSNS)

    International Nuclear Information System (INIS)

    Johnson, J.O.; Lillie, R.A.

    1997-01-01

    The use of neutrons in science and industry has increased continuously during the past 50 years with applications now widely used in physics, chemistry, biology, engineering, and medicine. Within this history, the relative merits of using pulsed accelerator spallation sources versus reactors for neutron sources as the preferred option for the future. To address this future need, the Department of Energy (DOE) has initiated a pre-conceptual design study for the National Spallation Neutron Source (NSNS) and given preliminary approval for the proposed facility to be built at Oak Ridge National Laboratory (ORNL). The DOE directive is to design and build a short pulse spallation source in the 1 MS power range with sufficient design flexibility that it can be upgraded and operated at a significantly higher power at a later stage. The pre-conceptualized design of the NSNS initially consists of an accelerator system capable of delivering a 1 to 2 GeV proton beam with 1 MW of beam power in an approximate 0.5 microsecond pulse at a 60 Hz frequency onto a single target station. The NSNS will be upgraded in stages to a 5 MW facility with two target stations (a high power station operating at 60 Hz and a low power station operating at 10 Hz). Each target station will contain four moderators (combinations of cryogenic and ambient temperature) and 18 beam liens for a total of 36 experiment stations. This paper summarizes the radiation transport analysis strategies for the proposed NSNS facility

  13. The HCV Synthesis Project: Scope, methodology, and preliminary results

    Directory of Open Access Journals (Sweden)

    Scheinmann Roberta

    2008-09-01

    Full Text Available Abstract Background The hepatitis C virus (HCV is hyper-endemic in injecting drug users. There is also excess HCV among non-injection drug users who smoke, snort, or sniff heroin, cocaine, crack, or methamphetamine. Methods To summarize the research literature on HCV in drug users and identify gaps in knowledge, we conducted a synthesis of the relevant research carried out between 1989 and 2006. Using rigorous search methods, we identified and extracted data from published and unpublished reports of HCV among drug users. We designed a quality assurance system to ensure accuracy and consistency in all phases of the project. We also created a set of items to assess study design quality in each of the reports we included. Results We identified 629 reports containing HCV prevalence rates, incidence rates and/or genotype distribution among injecting or non-injecting drug user populations published between January 1989 and December 2006. The majority of reports were from Western Europe (41%, North America (26%, Asia (11% and Australia/New Zealand (10%. We also identified reports from Eastern Europe, South America, the Middle East, and the Caribbean. The number of publications reporting HCV rates in drug users increased dramatically between 1989 and 2006 to 27–52 reports per year after 1998. Conclusion The data collection and quality assurance phases of the HCV Synthesis Project have been completed. Recommendations for future research on HCV in drug users have come out of our data collection phase. Future research reports can enhance their contributions to our understanding of HCV etiology by clearly defining their drug user participants with respect to type of drug and route of administration. Further, the use of standard reporting methods for risk factors would enable data to be combined across a larger set of studies; this is especially important for HCV seroconversion studies which suffer from small sample sizes and low power to examine risk

  14. Episodic Laryngeal Breathing Disorders: Literature Review and Proposal of Preliminary Theoretical Framework.

    Science.gov (United States)

    Shembel, Adrianna C; Sandage, Mary J; Verdolini Abbott, Katherine

    2017-01-01

    The purposes of this literature review were (1) to identify and assess frameworks for clinical characterization of episodic laryngeal breathing disorders (ELBD) and their subtypes, (2) to integrate concepts from these frameworks into a novel theoretical paradigm, and (3) to provide a preliminary algorithm to classify clinical features of ELBD for future study of its clinical manifestations and underlying pathophysiological mechanisms. This is a literature review. Peer-reviewed literature from 1983 to 2015 pertaining to models for ELBD was searched using Pubmed, Ovid, Proquest, Cochrane Database of Systematic Reviews, and Google Scholar. Theoretical models for ELBD were identified, evaluated, and integrated into a novel comprehensive framework. Consensus across three salient models provided a working definition and inclusionary criteria for ELBD within the new framework. Inconsistencies and discrepancies within the models provided an analytic platform for future research. Comparison among three conceptual models-(1) Irritable larynx syndrome, (2) Dichotomous triggers, and (3) Periodic occurrence of laryngeal obstruction-showed that the models uniformly consider ELBD to involve episodic laryngeal obstruction causing dyspnea. The models differed in their description of source of dyspnea, in their inclusion of corollary behaviors, in their inclusion of other laryngeal-based behaviors (eg, cough), and types of triggers. The proposed integrated theoretical framework for ELBD provides a preliminary systematic platform for the identification of key clinical feature patterns indicative of ELBD and associated clinical subgroups. This algorithmic paradigm should evolve with better understanding of this spectrum of disorders and its underlying pathophysiological mechanisms. Copyright © 2017 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  15. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  16. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  17. 75 FR 30905 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-02

    ... Project Number: LR-209-76 (T.D. 7941). Abstract: Internal Revenue Code section 6324A permits the executor... of a bond or personal liability if an election under section 6166 was made and the executor files an...

  18. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  19. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  20. Preliminary safety evaluation for the spent nuclear fuel project`s cold vacuum drying system

    Energy Technology Data Exchange (ETDEWEB)

    Garvin, L.J., Westinghouse Hanford

    1996-07-01

    This preliminary safety evaluation (PSE) considers only the Cold Vacuum Drying System (CVDS) facility and its mission as it relates to the integrated process strategy (WHC 1995). The purpose of the PSE is to identify those CBDS design functions that may require safety- class and safety-significant accident prevention and mitigation features.

  1. 77 FR 790 - Grant Lake Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2012-01-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13212-002] Grant Lake.... The proposed project would consist of: (1) Either (a) a 2-foot-high by 120-foot-long, concrete gravity... project reservoir, with a total storage capacity of 15,900 acre-feet and a water surface area of 1,790...

  2. Proposal for a project agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2001-01-01

    This document concerns a project agreement with the ISTC entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medecine and Pharmacology" to be executed in co-operation with the Crystal Clear Collaboration. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a project agreement with ISTC for a total amount of 775 000 US dollars. The European Union party in ISTC will co-fund the project up to a total of 525 000 US dollars. CERN's contribution will not exceed 250 000 US dollars. At the present rate of exchange this is equivalent to approximately 430 000 Swiss francs

  3. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  4. Environmental assessment report on proposed Yeelirrie uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    In accordance with Government requirements, Western Mining Corporation Ltd. has prepared a Draft Environmental Impact Statement/Environmental Review and Management Programme for its proposed uranium mine development at Yeelirrie, Western Australia. This report includes an outline of the proposal, an enviromental assessment, recommendations by the Environmental Protection Authority made after consideration of the Company's draft statement and a review of public and State Government Departmental Submissions received on the Yeelirrie EIS/ERMP

  5. 75 FR 44851 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-29

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting... Income and Earnings and Profits under the Dollar Approximate Separate Transactions Method of Accounting... Transactions Method of Accounting (DASTM). OMB Number: 1545-1051. Regulation Project Number: INTL-29-91...

  6. 78 FR 24312 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-24

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning, Changes in Accounting Periods. DATES: Written comments should be received on or before June 24, 2013 to be... in Accounting Periods. OMB Number: 1545-1748. Regulation Project Number: TD 8996. Abstract: Section 1...

  7. 75 FR 33671 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-14

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing final regulation, REG-106917-99 (TD 8996), Changes in Accounting Periods... INFORMATION: Title: Changes in Accounting Periods. OMB Number: 1545-1748. Regulation Project Number: REG...

  8. 75 FR 53023 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-30

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing final regulation, CO-99-91 (TD 8490), Limitations on Corporate Net...: Limitations on Corporate Net Operating Loss. OMB Number: 1545-1345. Regulation Project Number: CO-99-91...

  9. 77 FR 57196 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-09-17

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning limitations on corporate net operating loss carryforwards. DATES: Written comments should be received on or... Corporate Net Operating Loss Carryforwards. OMB Number: 1545-1260. Regulation Project Number: CO-62-89...

  10. 75 FR 11997 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-03-12

    ... Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is... Trust as Part of an Estate (Sec. 1.645-1). DATES: Written comments should be received on or before May... INFORMATION: Title: Election to Treat Trust as Part of an Estate. OMB Number: 1545-1578. Regulation Project...

  11. 77 FR 31912 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-05-30

    ... determining arbitrage profits. Under FI-7-94, the scope of interest rate hedging transactions covered by the... arbitrage restrictions on tax-exempt bonds. DATES: Written comments should be received on or before July 30...: Arbitrage Restrictions on Tax-Exempt Bonds. OMB Number: 1545-1347. Regulation Project Numbers: FI-36-92; FI...

  12. 78 FR 22036 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-12

    ... fair market value of the underlying property before and after the donation and (2) the conservation... qualified conservation contributions (Sec. 1.170A-14). DATES: Written comments should be received on or... INFORMATION: Title: Qualified Conservation Contributions. OMB Number: 1545-0763. Regulation Project Number: TD...

  13. 76 FR 55741 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-09-08

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Qualified Separate Lines of Business. DATES: Written comments should be received on or before November 7...: Title: Qualified Separate Lines of Business. OMB Number: 1545-1221. Regulation Project Number: EE-147-87...

  14. 76 FR 34807 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-06-14

    ... 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning electing small business trusts. DATES: Written comments should be received on or before August 15, 2011to...: Electing Small Business Trusts. OMB Number: 1545-1591. Regulation Project Number: REG-251701-96 (TD 8894...

  15. 76 FR 21427 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-15

    ... other administrative provisions of special application to manufacturers and retailers excise taxes... Manufacturers and Retailers Excise Taxes. OMB Number: 1545-0723. Regulation Project Number: T.D. 8043. Abstract... regulation. Type of Review: Extension of a currently approved collection. Affected Public: Individuals...

  16. 78 FR 41192 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-09

    ... definitions; excise tax returns. DATES: Written comments should be received on or before September 9, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal... definitions; excise tax returns. OMB Number: 1545-2193. Regulation Project Number: REG-155087-05. Abstract...

  17. 77 FR 3840 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-01-25

    ... consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue Service, room 6129...-1353. Regulation Project Number: FI-189-84. Abstract: These regulations provide definitions, reporting requirements, elections, and general rules relating to the tax treatment of debt instruments with original...

  18. 76 FR 69329 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-08

    ... collection requirements related to Tax Shelter Regulations. DATES: Written comments should be received on or before January 9, 2012 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette B... . SUPPLEMENTARY INFORMATION: Title: Tax Shelter Disclosure Regulations. OMB Number: 1545-1685. Regulation Project...

  19. 78 FR 8222 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-02-05

    ... Minimum Tax--Tax Benefit Rule. DATES: Written comments should be received on or before April 8, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue... Tax--Tax Benefit Rule. OMB Number: 1545-1093. Regulation Project Number: IA-56-87 and IA- 53-87 (TD...

  20. 76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-05-05

    ... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...

  1. 77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-02-08

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  2. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  3. 76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-09-30

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...

  4. 76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-04-07

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  5. 76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-11-25

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  6. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Science.gov (United States)

    2010-01-01

    ... time on submitted proposals until comparisons can be made with other existing projects or with project... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements...

  7. New construction of the Kelchbach hydropower installation - Preliminary project; Vorprojekt Neubau Kraftwerk Kelchbach. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Kalbermatten, J.

    2009-09-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes the preliminary project for the new construction of a small hydropower installation on the Kelchbach stream in Naters, Switzerland. After a pressure-pipe rupture, the old, over 100 year-old installation was closed down. The replacement installation is planned to increase power production. The works necessary for the realisation of this hydropower project are described and discussed. Several older studies on the replacement of the installation are listed. Three variants are presented and discussed as are hydrological data on the project. Cost estimates are presented and discussed. Estimates of energy production are also presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also examined.

  8. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  9. Developing an online support tool to assist students in higher education with project proposals

    OpenAIRE

    Haji Suhaili, Wida Susanty

    2015-01-01

    The research presented in this thesis investigates ways to assist students with writing their project proposals. There is limited literature on the problems students have when writing project proposals in Higher Education. Particularly most of the literature has concentrated on the writing aspects, rhetorical aspects and structure of a scientific article. Even though various studies on assessment of undergraduate individual and group project works have been done, the project pr...

  10. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  11. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  12. Review of Interactive Video--Romanian Project Proposal

    Science.gov (United States)

    Onita, Mihai; Petan, Sorin; Vasiu, Radu

    2016-01-01

    In the recent years, the globalization and massification of video education offer involved more and more eLearning scenarios within universities. This article refers to interactive video and proposes an overview of it. We analyze the background information, regarding the eLearning campus used in virtual universities around the world, the MOOC…

  13. 78 FR 8225 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-02-05

    ... submitted for renewal purposes only. Type of Review: Extension of a currently approved collection. Affected... respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on proposed and/or continuing information collections, as required by the Paperwork Reduction Act of...

  14. 75 FR 60507 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-09-30

    ..., or a property transfer (or transfer of the right to use property) a fair market value. Current... opportunity to comment on proposed and/or continuing information collections, as required by the Paperwork... Service, room 6129, 1111 Constitution Avenue, NW., Washington, DC 20224. FOR FURTHER INFORMATION CONTACT...

  15. 76 FR 9406 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-02-17

    ... comments concerning the existing proposed regulations, REG-100194-10, Specified Tax Return Preparers Required to File Individual Income Tax Returns Using Magnetic Media--Taxpayer Choice Statements. DATES...: Direct all written comments to Yvette Lawrence, Internal Revenue Service, Room 6129, 1111 Constitution...

  16. Sludge Treatment Project Engineered Container Retrieval And Transfer System Preliminary Design Hazard Analysis Supplement 1

    International Nuclear Information System (INIS)

    Franz, G.R.; Meichle, R.H.

    2011-01-01

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  17. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  18. Advanced Stellar Compass - Proposal for the LunARSat project

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Kilsgaard, Søren

    1998-01-01

    request for proposal (r.f.p.) for the LunARSat star tracker.The Advanced Stellar Compass (ASC) is a highly advanced and autonomous Stellar Reference Unit designed, developed and produced by the Space Instrumentation Group of the Department of Automation of the Technical University of Denmark.The document...... is structured as follows. First we present the ASC - heritage, system description, performance and the calibration procedures. In section 3 the mechanical and electrical interfaces are given. In section 4 and 5 we address issues like manufacturing, transportation and storage and to conclude, in sect. 6, we...

  19. Preliminary mapping of surficial geology of Midway Valley Yucca Mountain Project, Nye County, Nevada

    International Nuclear Information System (INIS)

    Wesling, J.R.; Bullard, T.F.; Swan, F.H.; Perman, R.C.; Angell, M.M.; Gibson, J.D.

    1992-04-01

    The tectonics program for the proposed high-level nuclear waste repository at Yucca Mountain in southwestern Nevada must evaluate the potential for surface faulting beneath the prospective surface facilities. To help meet this goal, Quaternary surficial mapping studies and photolineament analyses were conducted to provide data for evaluating the location, recency, and style of faulting with Midway Valley at the eastern base of Yucca Mountain, the preferred location of these surface facilities. This interim report presents the preliminary results of this work

  20. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  1. 77 FR 60424 - FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13484-001] FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, FFP Project 73, LLC filed an application for a...

  2. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Science.gov (United States)

    2010-05-04

    ... Proposed Cape Wind Energy Project in Nantucket Sound, Offshore Massachusetts AGENCY: Minerals Management... Energy Project proposed for Nantucket Sound, offshore Massachusetts. On January 16, 2009, the MMS... construct a wind power facility on Horseshoe Shoal in Nantucket Sound, offshore Massachusetts. Following the...

  3. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Science.gov (United States)

    2010-03-08

    ... Proposed Cape Wind Energy Project in Nantucket Sound, MA AGENCY: Minerals Management Service (MMS... MMS for the Cape Wind Energy Project proposed for Nantucket Sound, Massachusetts. On January 16, 2009... facility on Horseshoe Shoal in Nantucket Sound, Massachusetts. Following the adoption of the Energy Policy...

  4. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  5. 76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-18

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...

  6. 75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-03-19

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  7. 77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-01-04

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  8. 75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-11-22

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...

  9. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  10. 75 FR 37780 - Proposed Waivers and Extensions of Project Periods: Presidential Academies and Congressional...

    Science.gov (United States)

    2010-06-30

    ... the teaching of history. We seek this waiver and extension of project period in order to enable each... or the teaching of history. The Secretary certifies that the proposed waiver and extension of project... American History and Civics Education, and 34 CFR 75.261(c)(2), as it applies to the project funded under...

  11. Competitive strategy for the proposed Texas high speed rail project : a system dynamics/ CLIOS process approach.

    Science.gov (United States)

    2017-09-10

    The Texas High-Speed Rail (HSR) is an unprecedented US project proposed by a private company. This project has many uncertainties because it will be funded only by the private sectors and it is the first US HSR project using foreign technology. The H...

  12. Preliminary corrosion models for BWIP [Basalt Waste Isolation Project] canister materials

    International Nuclear Information System (INIS)

    Fish, R.L.; Anantatmula, R.P.

    1983-01-01

    Waste package development for the Basalt Waste Isolation Project (BWIP) requires the generation of materials degradation data under repository relevant conditions. These data are used to develop predictive models for the behavior of each component of waste package. The component models are exercised in performance analyses to optimize the waste package design. This document presents all repository relevant canister materials corrosion data that the BWIP and others have developed to date, describes the methodology used to develop preliminary corrosion models and provides the mathematical description of the models for both low carbon steel and Fe9Cr1Mo steel. Example environment/temperature history and model application calculations are presented to aid in understanding the models. The models are preliminary in nature and will be updated as additional corrosion data become available. 6 refs., 5 tabs

  13. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  14. SolarOil Project, Phase I preliminary design report. [Solar Thermal Enhanced Oil Recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Baccaglini, G.; Bass, J.; Neill, J.; Nicolayeff, V.; Openshaw, F.

    1980-03-01

    The preliminary design of the Solar Thermal Enhanced Oil Recovery (SolarOil) Plant is described in this document. This plant is designed to demonstrate that using solar thermal energy is technically feasible and economically viable in enhanced oil recovery (EOR). The SolarOil Plant uses the fixed mirror solar concentrator (FMSC) to heat high thermal capacity oil (MCS-2046) to 322/sup 0/C (611/sup 0/F). The hot fluid is pumped from a hot oil storage tank (20 min capacity) through a once-through steam generator which produces 4.8 MPa (700 psi) steam at 80% quality. The plant net output, averaged over 24 hr/day for 365 days/yr, is equivalent to that of a 2.4 MW (8.33 x 10/sup 6/ Btu/hr) oil-fired steam generator having an 86% availability. The net plant efficiency is 57.3% at equinox noon, a 30%/yr average. The plant will be demonstrated at an oilfield site near Oildale, California.

  15. 78 FR 21199 - Migratory Bird Hunting; Proposed 2013-14 Migratory Game Bird Hunting Regulations (Preliminary...

    Science.gov (United States)

    2013-04-09

    ..., Mississippi, Central, and Pacific) has a Flyway Council, a formal organization generally composed of one... Hunting Regulations (Preliminary) in this document. We published definitions of waterfowl flyways and... process must allow for public participation and an open exchange of ideas. We have developed this rule in...

  16. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  17. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  18. Landscape ecological impact of climatic change some preliminary findings of the LICC Project

    International Nuclear Information System (INIS)

    Boer, M.M.

    1991-01-01

    The main objectives of the LICC project are to address the potential effects of a future climatic change on (semi-) natural terrestrial ecosystems and landscapes in Europe; six case studies are covered: alpine regions, boreal and subartic regions, Mediterranean region, fluvial systems, wetlands and coastal dunes. Preliminary findings showed a serious lack in fundamental ecological knowledge. Assessment of potential effects involved changes in water and sediment fluxes, changes in the vegetation cover, species response, dispersal and migration in a fragmented landscape and modification of climate impacts by man

  19. Preliminary design report: Prototypical Spent Fuel Consolidation Equipment Demonstration Project: Phase 1

    International Nuclear Information System (INIS)

    Blissell, W.H.; Ciez, A.P.; Mitchell, J.L.; Winkler, C.J.

    1986-12-01

    This document describes the Westinghouse Preliminary Design for the Prototypical Consolidation Demonstration Project per Department of Energy (DOE) Contract No. DE-AC07-86ID12649 and under direction of the DOE Idaho Operations Office. The preliminary design is the first step to providing the Department of Energy with a fully qualified, licensable, cost-effective spent fuel rod consolidation system. The design was developed using proven technologies and equipment to create an innovative approach to previous rod consolidation concepts. These innovations will better enable the Westinghouse system to: consolidate fuel rods in a precise, fully-controlled, accountable manner; package all rods from two PWR fuel assemblies or from four BWR fuel assemblies in one 8.5 inch square consolidated rods canister; meet all functional requirements; operate with all fuel types common to the US commercial nuclear industry with minimal tooling changeouts; and meet consolidation production process rates, while maintaining operator and public health and safety. This Preliminary Design Report provides both detailed descriptions of the equipment required to perform the rod consolidation process and the supporting analyses to validate the design

  20. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  1. EUBerry: Competitiveness and marketing strategies of sustainable berries validated for improved health benefits - Introduction to the project and preliminary results

    NARCIS (Netherlands)

    Groot, M.J.; Roelofs, P.F.M.M.; Kaim, E.; Sijtsema, S.J.; Zimmermann, K.L.; Zmarlicki, K.

    2014-01-01

    The EUBerry project is not only building on technical research but also studies berry production and consumption from a social sciences perspective. This paper aims to describe the approach used in the EUBerry project about business economics as well as marketing. In addition some preliminary

  2. 76 FR 46357 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-08-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  3. 78 FR 26112 - Limitation on Claims Against Proposed Public Transportation Projects; Correction

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects; Correction AGENCY: Federal Transit Administration (FTA), DOT. ACTION... Register on April 22, 2013, concerning a limitation on claims for certain specified public transportation...

  4. 77 FR 20355 - Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps

    Science.gov (United States)

    2012-04-04

    ... collection). Affected Public: Current recipients of EDA assistance, to include (1) cities or other political... DEPARTMENT OF COMMERCE Economic Development Administration Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps AGENCY: Economic Development...

  5. Preliminary sensitivity analyses of corrosion models for BWIP [Basalt Waste Isolation Project] container materials

    International Nuclear Information System (INIS)

    Anantatmula, R.P.

    1984-01-01

    A preliminary sensitivity analysis was performed for the corrosion models developed for Basalt Waste Isolation Project container materials. The models describe corrosion behavior of the candidate container materials (low carbon steel and Fe9Cr1Mo), in various environments that are expected in the vicinity of the waste package, by separate equations. The present sensitivity analysis yields an uncertainty in total uniform corrosion on the basis of assumed uncertainties in the parameters comprising the corrosion equations. Based on the sample scenario and the preliminary corrosion models, the uncertainty in total uniform corrosion of low carbon steel and Fe9Cr1Mo for the 1000 yr containment period are 20% and 15%, respectively. For containment periods ≥ 1000 yr, the uncertainty in corrosion during the post-closure aqueous periods controls the uncertainty in total uniform corrosion for both low carbon steel and Fe9Cr1Mo. The key parameters controlling the corrosion behavior of candidate container materials are temperature, radiation, groundwater species, etc. Tests are planned in the Basalt Waste Isolation Project containment materials test program to determine in detail the sensitivity of corrosion to these parameters. We also plan to expand the sensitivity analysis to include sensitivity coefficients and other parameters in future studies. 6 refs., 3 figs., 9 tabs

  6. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  7. The Proposal of Scaling the Roles in Scrum of Scrums for Distributed Large Projects

    OpenAIRE

    Abeer M. AlMutairi; M. Rizwan Jameel Qureshi

    2015-01-01

    Scrum of scrums is an approach used to scale the traditional Scrum methodology to fit for the development of complex and large projects. However, scaling the roles of scrum members brought new challenges especially in distributed and large software projects. This paper describes in details the roles of each scrum member in scrum of scrum to propose a solution to use a dedicated product owner for a team and inclusion of sub-backlog. The main goal of the proposed solution i...

  8. 76 FR 4150 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation project will be barred unless the claim is filed on or before July 25, 2011. FOR...

  9. 76 FR 55470 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-09-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or...

  10. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  11. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  12. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  13. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  14. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  15. QMM Project. A proposal for field map measurement of the six HRS Quadrupoles in Hall A, CEBAF

    International Nuclear Information System (INIS)

    Fonvieille, H.; Quemener, G.; Vernin, P.

    1993-12-01

    The proposed measurements of the magnetic field maps of the six HRS quadrupoles in Hall A at CEBAF is summarized. The basis of the measurement using rotating coils and a preliminary design of the apparatus are presented. (author)

  16. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  17. Preliminaries to a feasibility analysis of the Maglev proposal of the Southern California Association of Governments for the region : a seed grant study report

    Science.gov (United States)

    2009-08-30

    This is a seed grant study to perform a preliminary investigation of the system components and : generalized costs of the magnetic levitation type of high speed rail system that is proposed for the : Southern California Region, TGVbased high speed...

  18. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  19. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  20. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  1. A preliminary examination of audience-related communications issues for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.

    1991-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation doses people may have received from exposure to radioactive materials released during past operations at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project was initiated in response to public concerns about possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to effectively communicate to the many different concerned audiences. Accordingly, the TSP directed PNL to examine methods for communicating causes and effects of uncertainties in the dose estimates. After considering the directive and discussing it with the Communications Subcommittee of the TSP, PNL undertook a broad investigation of communications methods to consider for inclusion in the TSP's current communications program. As part of this investigation, a literature review was conducted regarding risk communications. A key finding was that, in order to successfully communicate risk-related information, a thorough understanding of the knowledge level, concerns and information needs of the intended recipients (i.e., the audience) is necessary. Hence, a preliminary audience analysis was conducted as part of the present research. This report summarizes the results of this analysis. 1 ref., 9 tabs.

  2. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  3. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  4. Swedish methane gas project: a proposal with three alternatives. Svenskt metangasprojekt: ett foerslag med tre alternativ

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    A proposal concerning a BIOGAS project is given. The proposal includes: (a) microbiological research on, e.g., needs for additives to optimize the process, influence of the content of dry substance, high rate digesters, one- or two-stage processing, temperature tolerance, pH regulation, pressure dependence, methods for process regulation, hygienics, foam-quenching; (b) construction of a test plant equipped with instruments for analysis and supervision; and (c) construction of prototype plants at a swine farm and at a slaughterhouse. Detailed budgets and schedules are given for the project at three different possible total costs.

  5. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  6. The MACHO Project: Preliminary Results from 4 years of SMC observations.

    Science.gov (United States)

    Vandehei, T.; Griest, K.; Lehner, M.; Alcock, C.; Alves, D.; Cook, K.; Marshall, S.; Minniti, D.; Allsman, R.; Axelrod, T.; Freeman, K.; Peterson, B.; Rodgers, A.; Pratt, M.; Becker, A.; Stubbs, C.; Tomaney, A.; Bennett, D.; Quinn, P.; Sutherland, W.; Welch, D.

    1997-12-01

    The MACHO project is a search for dark matter in the form of massive compact halo objects(MACHOs). The project has photometrically monitored tens of millions of stars in the Large Magellanic Cloud (LMC), Small Magellanic Cloud (SMC), and Galactic bulge in search of rare gravitational microlensing events caused by these otherwise invisible objects. Microlensing toward the LMC has allowed powerful statements to be made about the dark population in the halo of our Galaxy, indicating that the MACHO halo fraction could be as high as f=0.5 with a most probable MACHO mass being ~ 0.5Msun. However, to date the LMC has been the only line of sight out of our Galaxy's halo. Clearly, another line of sight would provide a consistency check on these results, as well as another contraint on models of the halo, in particular on halo flattening. The SMC affords us this second line of sight. Here we give a status report on our upcoming 4 year results toward the SMC. We present the results of a preliminary analysis on over 2.2 million stars from 3 square degrees and discuss the implications for the dark matter in the halo of our Galaxy. A detailed analysis of the microlensing candidates toward the SMC, with blending and parallax fits, will be shown. This work is dedicated to the memory of Alex Rodgers.

  7. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  8. Proposal of a calculation methodology for the preliminary design of a coalescing filter

    International Nuclear Information System (INIS)

    Gonzalez Dobrosky, Cintia

    2015-01-01

    Coalescing filters are described which are equipments for capture and recovery of mist most efficient, inexpensive and have fewer limitations of application. The operation, equations and ideal characteristics of filter media of these models are explained. A methodology for design and scale-up of this type of equipment for liquid recovery in gaseous currents is proposed from experimental tests, in order to guide the interested reader in its making. (author) [es

  9. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  10. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  11. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  12. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  13. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  14. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  15. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ...] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The..., will conduct a random drawing to determine the filing priority of the applicants identified in this... regulations.\\2\\ The priority established by this drawing will be used to determine which applicant, among...

  16. Project Overview: Cumulus Humilis Aerosol Processing Study (CHAPS): Proposed Summer 2007 ASP Field Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Berkowitz, Carl M.; Berg, Larry K.; Ogren, J. A.; Hostetler, Chris A.; Ferrare, Richard

    2006-05-18

    This white paper presents the scientific motivation and preliminary logistical plans for a proposed ASP field campaign to be carried out in the summer of 2007. The primary objective of this campaign is to use the DOE Gulfstream-1 aircraft to make measurements characterizing the chemical, physical and optical properties of aerosols below, within and above large fields of fair weather cumulus and to use the NASA Langley Research Center’s High Spectral Resolution Lidar (HSRL) to make independent measurements of aerosol backscatter and extinction profiles in the vicinity of these fields. Separate from the science questions to be addressed by these observations will be information to add in the development of a parameterized cumulus scheme capable of including multiple cloud fields within a regional or global scale model. We will also be able to compare and contrast the cloud and aerosol properties within and outside the Oklahoma City plume to study aerosol processes within individual clouds. Preliminary discussions with the Cloud and Land Surface Interaction Campaign (CLASIC) science team have identified overlap between the science questions posed for the CLASIC Intensive Operation Period (IOP) and the proposed ASP campaign, suggesting collaboration would benefit both teams.

  17. Preliminary Assessment of Potential Avian Interactions at Four Proposed Wind Energy Facilities on Vandenberg Air Force Base, California

    Energy Technology Data Exchange (ETDEWEB)

    2004-08-01

    The United States Air Force (USAF) is investigating whether to install wind turbines to provide a supplemental source of electricity at Vandenberg Air Force Base (VAFB) near Lompoc, California. As part of that investigation, VAFB sought assistance from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to provide a preliminary characterization of the potential risk to wildlife resources (mainly birds and bats) from wind turbine installations. With wind power development expanding throughout North America and Europe, concerns have surfaced over the number of bird fatalities associated with wind turbines. Guidelines developed for the wind industry by the National Wind Coordinating Committee (NWCC) recommend assessing potential impacts to birds, bats, and other potentially sensitive resources before construction. The primary purpose of an assessment is to identify potential conflicts with sensitive resources, to assist developers with identifying their permitting needs, and to develop strategies to avoid impacts or to mitigate their effects. This report provides a preliminary (Phase I) biological assessment of potential impacts to birds and bats that might result from construction and operation of the proposed wind energy facilities on VAFB.

  18. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Progress and Preliminary Results

    Science.gov (United States)

    Rosenzweig, C.

    2011-12-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a distributed climate-scenario simulation exercise for historical model intercomparison and future climate change conditions with participation of multiple crop and agricultural trade modeling groups around the world. The goals of AgMIP are to improve substantially the characterization of risk of hunger and world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. Recent progress and the current status of AgMIP will be presented, highlighting three areas of activity: preliminary results from crop pilot studies, outcomes from regional workshops, and emerging scientific challenges. AgMIP crop modeling efforts are being led by pilot studies, which have been established for wheat, maize, rice, and sugarcane. These crop-specific initiatives have proven instrumental in testing and contributing to AgMIP protocols, as well as creating preliminary results for aggregation and input to agricultural trade models. Regional workshops are being held to encourage collaborations and set research activities in motion for key agricultural areas. The first of these workshops was hosted by Embrapa and UNICAMP and held in Campinas, Brazil. Outcomes from this meeting have informed crop modeling research activities within South America, AgMIP protocols, and future regional workshops. Several scientific challenges have emerged and are currently being addressed by AgMIP researchers. Areas of particular interest include geospatial weather generation, ensemble methods for climate scenarios and crop models, spatial aggregation of field-scale yields to regional and global production, and characterization of future changes in climate variability.

  19. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    International Nuclear Information System (INIS)

    Chareyron, Bruno

    2012-01-01

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 μSv/h compared to 0.15 μSv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  20. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  1. Establishment of a Photon Data Section of the BNL National Nuclear Data Center: A preliminary proposal

    International Nuclear Information System (INIS)

    Hanson, A.L.; Pearlstein, S.

    1992-05-01

    It is proposed to establish a Photon Data Section (PDS) of the BNL National Nuclear Data Center (NNDC). This would be a total program encompassing both photon-atom and photon-nucleus interactions. By utilizing the existing NNDC data base management expertise and on-line access capabilities, the implementation of photon interaction data activities within the existing NNDC nuclear structure and nuclear-reaction activities can reestablish a viable photon interaction data program at minimum cost. By taking advantage of the on-line capabilities, the x-ray users' community will have access to a dynamic, state-of-the-art data base of interaction information. The proposed information base would include data that presently are scattered throughout the literature usually in tabulated form. It is expected that the data bases would include at least the most precise data available in photoelectric cross sections, atomic form factors and incoherent scattering functions, anomalous scattering factors, oscillator strengths and oscillator densities, fluorescence yields, Auger electron yields, etc. It could also include information not presently available in tabulations or in existing data bases such as EXAFS (extended x-ray absorption fine structure) reference spectra, chemical bonding induced shifts in the photoelectric absorption edge, matrix corrections, x-ray Raman, and x-ray resonant Raman cross sections. The data base will also include the best estimates of the accuracy of the interaction data as it exists in the data base. It is proposed that the PDS would support computer programs written for calculating scattering cross sections for given solid angles, sample geometries, and polarization of incident x-rays, for calculating Compton profiles, and for analyzing data as in EXAFS and x-ray fluorescence

  2. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  3. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  4. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  5. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Science.gov (United States)

    2010-06-24

    .... ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies... result of a tiered environmental review process under the National Environmental Policy Act, 42 U.S.C... judicial review of the Tier 1 Federal agency actions of the proposed highway and transit project will be...

  6. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  7. STRATEGIC MAPS AND CRITICAL FACTORS FOR PROJECT MANAGEMENT MATURITY: A PROPOSAL

    Directory of Open Access Journals (Sweden)

    Sady Darcy Silva Junior

    2010-06-01

    Full Text Available Project Management (PM and Strategic Management (SM are two subjects of growing importance in the corporate environment which are normally considered in isolation. One way of integrating these two concepts might be via the concept of project management maturity (Westphal et al., 2008. Rabechini and Pessoa (2005 state that to obtain project management maturity, it is necessary to achieve success in a number of critical factors which include organizational culture and structure, as well as sponsorship at both tactical and strategic levels (Silva et al., 2008. Another way of achieving this connection is by using Balanced Scorecard (BSC as an auxiliary tool to integrate between projects and organizational strategy (Brock et al., 2003. The original developers of the BSC, Kaplan e Norton, subsequently developed the concept of strategy mapping, which they affirm "represents the missing link between the formulation and the execution of the strategy" (Kaplan e Norton, 2004. This paper proposes a strategy map identifying critical factors for attaining project management maturity. To formulate the map, we used a qualitative, exploratory approach oriented by Project Management theory and strategy mapping. We first identified 13 critical factors, then developed a strategy map, which was evaluated by six specialists (three in SM area and three in PM area.The results suggest links between strategic mapping nad critical factors in project management. It also contributes to both areas independently. Specifically, the study identifies critical factors for project management maturity while demonstrating the applicability of strategic mapping techniques to Balanced Scorecard concepts.

  8. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  9. Proposal of the Use of a Fuzzy Stochastic Network for the Preliminary Evaluation of the Feasibility of the Process of the Adaptation of a Historical Building to a Particular Form of Use

    Science.gov (United States)

    Radziszewska-Zielina, Elżbieta; Śladowski, Grzegorz

    2017-10-01

    The knowledge of a real estate developer regarding the possibilities of adapting a historical building to a particular form of use and the knowledge of the approximate costs associated with this process are some of the more important pieces of information that can influence the making of the final decision regarding commencing with such a project. The preliminary analysis of the process of adapting a historical building is a difficult task due to the specific character of this type of project. The specific character of such a project is proven by the fact that the often insufficient analysis of the structure and architecture of a building and its historical substance at the stage of carrying out the process of adaptation can generate the necessity to perform previously unforeseen additional actions. An equally important problem is the difficulty in estimating the funds required to conduct research and the analyses associated with developing design documentation, as well as carrying out construction and conservation work. This is why a real estate developer should analyse various scenarios of carrying out a project during the stage of the preliminary analysis of its feasibility, taking into account the fact that some of them can occur in a random manner. The authors of the paper propose the use of one of the planning tools known as stochastic networks, which can be used to model the undetermined structure of these types of projects. Fuzzy logic was used in order to estimate uncertain values of the parameters of a model (the probability of performing work and paying the associated costs). The approach proposed by the authors was used to perform a preliminary analysis of the adaptation of the Arsenal in Gdańsk to a particular form of use along with estimating the costs associated with it. The results that were obtained have confirmed the potential of this method for real-world application.

  10. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  11. The Mediterranean Solar Plan: Project proposals for renewable energy in the Mediterranean Partner Countries region

    International Nuclear Information System (INIS)

    Jablonski, Sophie; Tarhini, Mohamad; Touati, Manaf; Gonzalez Garcia, David; Alario, Juan

    2012-01-01

    This paper presents a first assessment of the renewable energy projects, proposed by the nine Mediterranean Partner Countries (MPCs) under the Mediterranean Solar Plan (MSP) and the associated potential economic impacts. As one of the priority projects of the Union for the Mediterranean (UfM), the MSP's objective which attracted most attention until now is the intention to deploy an additional 20 GW of renewable electrical capacity in the Southern and Eastern Mediterranean region (covering the MPCs plus Turkey) by 2020. The main findings of this research are: (1) as of February 2010, a total of 10.3 GW of renewable project proposals were identified in the MPCs, corresponding to about half of the 20 GW target; (2) investment needs for the identified projects could amount to EUR 21 billion by 2020, which represents about five times the amount invested by the region in conventional electricity generation in the last decade; and (3) the difference between the cost of renewable electricity generation and the economic cost of its fossil fuel alternatives could amount to EUR 1.2 billion. Insights stemming from the results of this research can generate useful regional messages for energy policy leaders in the MPCs to accelerate the development of renewable energy projects. - Highlights: ► We conducted a systematic survey of renewable energy projects in the Mediterranean. ► The identified projects correspond to half the MSP 20 GW target. ► Maturity assessment is used to classify the advancement of the projects. ► We estimated the investment needs and required subsidies in the region by 2020.

  12. Drinking-water hydropower installation at Schattdorf - Preliminary project; Trinkwasserkraftwerk Oberfeld Haldi bei Schattdorf. Programm Kleinwasserkraftwerke. Vorprojekt 2009

    Energy Technology Data Exchange (ETDEWEB)

    Gasser, M.

    2009-09-15

    This preliminary project report for the Swiss Federal Office of Energy (SFOE) describes the project for the construction of a small hydropower installation near Schattdorf, Switzerland. The location of the Faetsch springs and the ownership of the various land parcels involved are described. The general water supply project for Oberfeld-Haldi and the various springs and reservoirs involved are also discussed. The works necessary for the realisation of the hydropower project are described and discussed. Cost estimates are presented and the application for cost-covering remuneration of the scheme is noted. Estimates of energy production are presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also discussed.

  13. An Overview of the International H2O Project (IHOP_2002) and Some Preliminary Highlights.

    Science.gov (United States)

    Weckwerth, Tammy M.; Parsons, David B.; Koch, Steven E.; Moore, James A.; Lemone, Margaret A.; Demoz, Belay B.; Flamant, Cyrille; Geerts, Bart; Wang, Junhong; Feltz, Wayne F.

    2004-02-01

    The International H2O Project (IHOP_2002) is one of the largest North American meteorological field experiments in history. From 13 May to 25 June 2002, over 250 researchers and technical staff from the United States, Germany, France, and Canada converged on the Southern Great Plains to measure water vapor and other atmospheric variables. The principal objective of IHOP_2002 is to obtain an improved characterization of the time-varying three-dimensional water vapor field and evaluate its utility in improving the understanding and prediction of convective processes. The motivation for this objective is the combination of extremely low forecast skill for warm-season rainfall and the relatively large loss of life and property from flash floods and other warm-season weather hazards. Many prior studies on convective storm forecasting have shown that water vapor is a key atmospheric variable that is insufficiently measured. Toward this goal, IHOP_2002 brought together many of the existing operational and new state-of-the-art research water vapor sensors and numerical models.The IHOP_2002 experiment comprised numerous unique aspects. These included several instruments fielded for the first time (e.g., reference radiosonde); numerous upgraded instruments (e.g., Wyo-ming Cloud Radar); the first ever horizontal-pointing water vapor differential absorption lidar (DIAL; i.e., Leandre II on the Naval Research Laboratory P-3), which required the first onboard aircraft avoidance radar; several unique combinations of sensors (e.g., multiple profiling instruments at one field site and the German water vapor DIAL and NOAA/Environmental Technology Laboratory Doppler lidar on board the German Falcon aircraft); and many logistical challenges. This article presents a summary of the motivation, goals, and experimental design of the project, illustrates some preliminary data collected, and includes discussion on some potential operational and research implications of the experiment.

  14. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  15. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  16. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  17. Proposing a project for building an e-commerce website for Ryijypalvelu-RP Oy

    OpenAIRE

    Sotkov, Ilya

    2014-01-01

    The thesis describes the development of a project proposal report for building an e-commerce website for a small textile firm based in Helsinki, Finland. The aim of the study is to determine how small businesses that are currently not highly involved in e-commerce should approach developing an e-commerce website in order to maximize the positive impact of selling on the Internet. The study combined the use of action research and qualitative research methodologies by developing a project p...

  18. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  19. Uses of geothermal energy in Jordan for heating greenhouses; project proposal

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.; Masarwah, Rober; Elkarmi, Fawwaz

    1993-08-01

    A proposal for the exploration of geothermal energy in Jordan for heating greenhouses. The report gives some background information on geothermal anomalies in Jordan, and outlines some on-going uses of geothermal energy in various parts of Jordan. The proposal is modelled on the 2664 square meter Filclair Super 9 Multispan greenhouse from France. The overall cost of the project involves three variables, the cost of the borehole, the cost of the greenhouse, and the cost of engineering services. The total cost ranges between three to four million dollars depending on the quantity and quality of information to be collected from the borehole. The advantages of geothermal heating compared with oil heating are emphasized. The project will enable geothermal heating and horticultural production to be monitored throughout the year, will produce data enabling rational and reliable water resources management, and will produce environmentally clean and efficient energy. (A.M.H.). 1 tab. 1 map

  20. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    Science.gov (United States)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  1. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  2. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  3. A Preliminary Study on Time Projection Chamber Simulation for Fission Cross Section Measurements with Geant4

    International Nuclear Information System (INIS)

    Kim, Jong Woon; Lee, Youngouk; Kim, Jae Cheon

    2014-01-01

    We present the details of the TPC simulation with Geant4 and show the results. TPC can provide more information than a fission chamber in that it is possible to distinguish different particle types. Simulations are conducted for uranium and plutonium targets with 20MeV neutrons. The simulation results are compared with the reference and show reasonable results. This is the first phase of study for realizing a TPC in the NFS at RAON, and we have more work to do, such as applying an electric field, signal processing in the simulation, and manufacturing of a TPC. The standard in fission cross section measurement is a fission chamber. It is basically just two parallel plates separated by a few centimeters of gas. A power supply connected to the plates sets up a moderate electric field. The target is deposited onto one of the plates. When fission occurs, the fragments ionize the gas, and the electric field causes the produced electrons to drift to the opposite plate, which records the total energy deposited in the chamber. A Time Projection Chamber (TPC) is a gas ionization detector similar to a fission chamber. However, it can measure the charged particle trajectories in the active volume in three dimensions by adding several readouts on the pad plane (fission chamber has only one readout one a pad plane). The specific ionization for each particle track enables the TPC to distinguish different particle types. A TPC will be used for fission cross section measurements in the Neutron Science Facility (NSF) at RAON. As a preliminary study, we present details of TPC simulation with Geant4 and discuss the results

  4. New shipyard layout design for the preliminary phase & case study for the green field project

    Science.gov (United States)

    Song, Young Joo; Woo, Jong Hun

    2013-03-01

    For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

  5. New shipyard layout design for the preliminary phase & case study for the green field project

    Directory of Open Access Journals (Sweden)

    Young Joo Song

    2013-03-01

    Full Text Available For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

  6. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  7. Proposal for the further development of the 'Ribeira Grande' agricultural geothermal project

    International Nuclear Information System (INIS)

    Popovski, Kiril; De Medeiros, Jorge Rosa; Rodrigues, Ana Catarina Tavares

    2000-01-01

    Geothermal project Ribeira Grande has been the first trial to introduce the possibilities of direct application of geothermal energy at Azores. As all the first experiences, it's development has been escorted with a list of difficulties and problems, resulting with non proper completion of some systems and installations. However, even not complete, the reached results justified both technically and economically the indigenous resource door for further activities and development. Presented proposal for the second phase of project development consists two very important advantages: 1) Enables development of new demonstration and productive projects, without engaging new import of fuels or other energents; 2) Enables development based on the already existing economy sectors at the islands and makes them more profitable and accommodated to the requests of the national and international market. However, influencing national and international preconditions for the realization of the proposed activities are not very convenient and are requesting a concentrate engagement of the Institute for Innovative Technologies of Azores INOVA during the period of next 5 years. The final success of this engagement shall open very wide possibilities for direct application of geothermal energy development in this isolated EC community, presently mainly orientated towards import both of energy and food. (Authors)

  8. Feasibility and potential effects of the proposed Amargosa Creek Recharge Project, Palmdale, California

    Science.gov (United States)

    Christensen, Allen H.; Siade, Adam J.; Martin, Peter; Langenheim, V.E.; Catchings, Rufus D.; Burgess, Matthew K.

    2015-09-17

    Historically, the city of Palmdale and vicinity have relied on groundwater as the primary source of water, owing, in large part, to the scarcity of surface water in the region. Despite recent importing of surface water, groundwater withdrawal for municipal, industrial, and agricultural use has resulted in groundwater-level declines near the city of Palmdale in excess of 200 feet since the early 1900s. To meet the growing water demand in the area, the city of Palmdale has proposed the Amargosa Creek Recharge Project (ACRP), which has a footprint of about 150 acres along the Amargosa Creek 2 miles west of Palmdale, California. The objective of this study was to evaluate the long-term feasibility of recharging the Antelope Valley aquifer system by using infiltration of imported surface water from the California State Water Project in percolation basins at the ACRP.

  9. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  10. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  11. New Regional and Global HFC Projections and Effects of National Regulations and Montreal Protocol Amendment Proposals

    Science.gov (United States)

    Velders, G. J. M.

    2015-12-01

    Hydrofluorocarbons (HFCs) are used as substitutes for ozone-depleting substances that are being phased out globally under Montreal Protocol regulations. New global scenarios of HFC emissions reach 4.0-5.3 GtCO2-eq yr-1 in 2050, which corresponds to a projected growth from 2015 to 2050 which is 9% to 29% of that for CO2 over the same time period. New baseline scenarios are formulated for 10 HFC compounds, 11 geographic regions, and 13 use categories. These projections are the first to comprehensively assess production and consumption of individual HFCs in multiple use sectors and geographic regions with emission estimates constrained by atmospheric observations. In 2050, in percent of global HFC emissions, China (~30%), India and the rest of Asia (~25%), Middle East and northern Africa (~10%), and USA (~10%) are the principal source regions; and refrigeration and stationary air conditioning are the major use sectors. National regulations to limit HFC use have been adopted recently in the European Union, Japan and USA, and four proposals have been submitted in 2015 to amend the Montreal Protocol to substantially reduce growth in HFC use. Calculated baseline emissions are reduced by 90% in 2050 by implementing the North America Montreal Protocol amendment proposal. Global adoption of technologies required to meet national regulations would be sufficient to reduce 2050 baseline HFC consumption by more than 50% of that achieved with the North America proposal for most developed and developing countries. The new HFC scenarios and effects of national regulations and Montreal Protocol amendment proposals will be presented.

  12. An assessment strategy for proposals of engineering projects in the Bachelor of Biomedical Engineering Curriculum at Universidad Autónoma Metropolitana-Iztapalapa.

    Science.gov (United States)

    Castañeda-Villa, N; Jiménez-González, A; Ortiz-Posadas, M R

    2015-08-01

    Since 1974, the Bachelor of Biomedical Engineering Program (BBME) is offered at Universidad Autónoma Metropolitana-Iztapalapa, in Mexico City. By design, it must be completed in four years (12 trimesters) and, in the latter three, the senior students work on a BME project, which is done by completing three modules: Project Seminar (PS), Project on BME I and Project on BME II. In the PS module, the student must find a problem of interest in the BME field and suggest a solution through the development of an Engineering Project Proposal (EPP). Currently, the module is being taught by two faculty members of the BBME, who instruct students on how to develop their EPPs and evaluate their progress by reviewing a number of EPPs during the trimester. This generates a huge workload for the module instructors, which makes it necessary to involve more faculty members trimester-to-trimester (i.e. every 12 weeks) and, therefore, to create a set of systematic guidelines that ease the evaluation process for new instructors. Hence, the purpose of this paper is to present an assessment strategy (in the form of an assessment matrix) for the PS module as well as some preliminary results after two trimesters of its implementation.

  13. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  14. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  15. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  16. Preliminary proposal of a Nb3Sn quadrupole model for the low β insertions of the LHC

    International Nuclear Information System (INIS)

    Ambrosio, G.; Ametrano, F.; Bellomo, G.; Broggi, F.; Rossi, L.; Volpini, G.

    1995-09-01

    In recent years Nb 3 Sn based conductors have shown wide applicability for superconducting magnets in many research areas like high field solenoids for laboratory experiment, for NMR spectroscopy and high field magnets for fusion. Nb 3 Sn technology is progressing fast, increasing both technical reliability and availability. The Nb 3 Sn technology, which has a higher critical field than NbTi, seems attractive for IR (Insertion Region) quadrupoles of large colliders . In this paper it is proposed the construction of a superconducting quadrupole wound with Nb 3 Sn cable for a second generation IR inner triplet low β quadrupoles, for the Large Hadron Collider at CERN. The low β quadrupoles, control the beam focusing at collision points, therefore a gain in term of focus strength and/or coil aperture can increase significantly machine performance. Two are the main steps for the whole project: 1) design and construction of a 1 metre long quadrupole to demonstrate the actual feasibility, which is the subject of this proposal; 2) study for integration of the quadrupole in the machine and final design of 5 m long quadrupoles finalized to the LHC

  17. Preliminary proposal of a Nb{sub 3}Sn quadrupole model for the low {beta} insertions of the LHC

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, G; Ametrano, F; Bellomo, G; Broggi, F; Rossi, L; Volpini, G [Milan Univ. (Italy). Dip. di Fisica; [INFN, Sezione di Milano (Italy). Laboratorio Acceleratori e Superconduttivita` Applicata

    1995-09-01

    In recent years Nb{sub 3}Sn based conductors have shown wide applicability for superconducting magnets in many research areas like high field solenoids for laboratory experiment, for NMR spectroscopy and high field magnets for fusion. Nb{sub 3}Sn technology is progressing fast, increasing both technical reliability and availability. The Nb{sub 3}Sn technology, which has a higher critical field than NbTi, seems attractive for IR (Insertion Region) quadrupoles of large colliders . In this paper it is proposed the construction of a superconducting quadrupole wound with Nb{sub 3}Sn cable for a second generation IR inner triplet low {beta} quadrupoles, for the Large Hadron Collider at CERN. The low {beta} quadrupoles, control the beam focusing at collision points, therefore a gain in term of focus strength and/or coil aperture can increase significantly machine performance. Two are the main steps for the whole project: (1) design and construction of a 1 metre long quadrupole to demonstrate the actual feasibility, which is the subject of this proposal; (2) study for integration of the quadrupole in the machine and final design of 5 m long quadrupoles finalized to the LHC.

  18. School Improvement Plans and Student Achievement: Preliminary Evidence from the Quality and Merit Project in Italy

    Science.gov (United States)

    Caputo, Andrea; Rastelli, Valentina

    2014-01-01

    This study provides preliminary evidence from an Italian in-service training program addressed to lower secondary school teachers which supports school improvement plans (SIPs). It aims at exploring the association between characteristics/contents of SIPs and student improvement in math achievement. Pre-post standardized tests and text analysis of…

  19. Report of preliminary investigations on the next-generation large-scale synchrotron radiation facility projects

    International Nuclear Information System (INIS)

    1990-01-01

    The Special Committee for Future Project of the Japanese Society for Synchrotron Radiation Research investigated the construction-projects of the large-scaled synchrotron radiation facilities which are presently in progress in Japan. As a result, the following both projects are considered the very valuable research-project which will carry the development of Japan's next-generation synchrotron radiation science: 1. the 8 GeV synchrotron radiation facilities (SPring-8) projected to be constructed by Japan Atomic Energy Research Institute and the Institute of Physical and Chemical Research under the sponsorship of Science Technology Agency at Harima Science Park City, Hyogo Pref., Japan. 2. The project to utilize the Tristan Main Ring (MR) of the National Laboratory for High Energy Physics as the radiation source. Both projects are unique in research theme and technological approach, and complemental each other. Therefore it has been concluded that both projects should be aided and ratified by the Society. (M.T.)

  20. Position sensitivity of the proposed segmented germanium detectors for the DESPEC project

    International Nuclear Information System (INIS)

    Khaplanov, A.; Tashenov, S.; Cederwall, B.

    2009-01-01

    The DESPEC HPGe array is a part of the NuSTAR project at FAIR, Germany. It is aimed at the spectroscopy of the stopped decaying exotic nuclei. Segmented γ-ray tracking detectors are proposed for this array in order to maximize detection efficiency and background suppression when searching for very rare events. Two types of detector modules-stacks of three 16-fold segmented planar crystals and 12- and 16-fold segmented clover detectors-have been investigated and compared from the point of view of the achievable position resolution using pulse shape analysis (PSA). To this end, detector signals from realistic γ-ray interactions have been calculated. These signals were treated by PSA in order to reconstruct the photon interaction locations. Comparing the initial interaction locations to the reconstructed ones, it was found that the double-sided strip planar detector yielded position reconstruction errors at least a factor 2 lower than the other detectors considered.

  1. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  2. Proposal of experimental facilities for studies of nuclear data and radiation engineering in the Intense Proton Accelerator Project

    CERN Document Server

    Baba, M; Nagai, Y; Ishibashi, K

    2003-01-01

    A proposal is given on the facilities and experiments in the Intense Proton Accelerator Project (J-PARC) relevant to the nuclear data and radiation engineering, nuclear astrophysics, nuclear transmutation, accelerator technology and space technology and so on. (3 refs).

  3. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  4. Protecting Place Through Community Alliances: Haida Gwaii Responds to the Proposed Enbridge Northern Gateway Project

    Science.gov (United States)

    Crist, Valine

    This research contributes to the emerging dialogue concerning power relationships and the alliances that are challenging current frameworks in an attempt to create positive change. Worldwide, local people in rural places are threatened by development paradigms and conflicting social, political, economic, and ecological values. Large-scale development, such as the Enbridge Northern Gateway Project (NGP), provide a tangible example of our failing systems and make the interplay of these elements palpable. Increasingly, communities are coalescing to challenge the current models and economically motivated agendas threatening Indigenous sovereignty and local lifeways. Central to these coalitions are Indigenous peoples who are aligning with non-Indigenous neighbours to renegotiate power relationships. This research examines these dynamic alliances and uses Haida Gwaii's resistance to the NGP as an example of the formidable strength of community coalitions mobilized by intersecting values. To contextualize the NGP within the broader discourse, I problematize Canada's environmental assessment process and consider how media portrays the growing resistance to the proposed project. Drawing on information presented through the environmental assessment, I analyze the main messages and shared values of Haida Gwaii citizens opposed to the NGP. This thesis focuses on this unanimous and galvanizing resistance, which is largely motivated by the reliance on local food sources and an embodied connection to Haida Gwaii shared by Island citizens. The continued denial of Aboriginal title and rights was inherent throughout this consideration and is an underlying theme throughout the analyses.

  5. Far-infrared elastic scattering proposal for the Avogadro Project's silicon spheres

    Science.gov (United States)

    Humayun, Muhammad Hamza; Khan, Imran; Azeem, Farhan; Chaudhry, Muhammad Rehan; Gökay, Ulaş Sabahattin; Murib, Mohammed Sharif; Serpengüzel, Ali

    2018-05-01

    Avogadro constant determines the number of particles in one mole of a substance, thus relating the molar mass of the substance to the mass of this substance. Avogadro constant is related to Système Internationale base units by defining the very concept of chemical quantity. Revisions of the base units created a need to redefine the Avogadro constant, where a collaborative work called the Avogadro Project is established to employ optical interferometry to measure the diameter of high quality 100 mm silicon spheres. We propose far-infrared spectroscopy for determining the Avogadro constant by using elastic scattering from the 100 mm Avogadro Project silicon spheres. Similar spectroscopic methods are already in use in the near-infrared, relating whispering gallery modes of the 1 mm silicon spheres to the diameter of the spheres. We present numerical simulations in the far-infrared and the near-infrared, as well as spatially scaled down elastic scattering measurements in the near-infrared. These numerical and experimental results show that, the diameter measurements of 100 mm single crystal silicon spheres with elastic scattering in the far-infrared can be considered as an alternative to optical interferometry.

  6. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  7. Optimisation of small-scale hydropower using quality assurance methods - Preliminary project; Vorprojekt: Optimierung von Kleinwasserkraftwerken durch Qualitaetssicherung. Programm Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Hofer, S.; Staubli, T.

    2006-11-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary project that examined how quality assurance methods can be used in the optimisation of small-scale hydropower projects. The aim of the project, to use existing know-how, experience and synergies, is examined. Discrepancies in quality and their effects on production prices were determined in interviews. The paper describes best-practice guidelines for the quality assurance of small-scale hydro schemes. A flow chart describes the various steps that have to be taken in the project and realisation work. Information collected from planners and from interviews made with them are presented along with further information obtained from literature. The results of interviews concerning planning work, putting to tender and the construction stages of these hydro schemes are presented and commented on. Similarly, the operational phase of such power plant is also examined, including questions on operation and guarantees. The aims of the follow-up main project - the definition of a tool and guidelines for ensuring quality - are briefly reviewed.

  8. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  9. Baseline environmental survey of proposed uranium mining projects of Domiasiat, Meghalaya

    International Nuclear Information System (INIS)

    Khathing, D.T.; Myrboh, B.; Nongkynrih, P.; War, S.A.; Marbaniang, D.G.; Iongwai, P.S.

    2005-01-01

    West Khasi Hills District of Meghalaya is identified as having a large and rich deposits of Uranium. However, actual extraction on a commercial scale that may lead to an increase in the socio-economic development of the state in particular and the country in general, is yet to be undertaken. This is due to lack of any baseline environmental survey giving rise to speculative information and causing a fear psychosis in the minds of the locals populace about the negative effects of Uranium mining. A preoperational survey and environmental monitoring of the proposed mining sites and its adjacent areas would establish the baseline status of the natural radioactivity and some chemical constituents in different environmental matrices via. air, water, soil, biota and aquatic ecosystems. The North Eastern Hill University, Shillong, Meghalaya has undertaken the Project funded by DST and BRNS, Department of Atomic Energy, Govt. of India which aims to provide baseline environmental data on ambient air, water and soil quality in and around the proposed Uranium mining site of Domiasiat, West Khasi Hills in the state of Meghalaya. Trace elements (elements like Mg, Zn, Ca, K, Na, Se, As, Fe, Cu, Co, Cr, Ni, Pb, Cd, Mn etc) and the status of the activity in the samples are determined. (author)

  10. 75 FR 27854 - 30-Day Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in...

    Science.gov (United States)

    2010-05-18

    ... Information Collection: DS-4048, Projected Sales of Major Weapons in Support of Section 25(a)(1) of the Arms... Reduction Act of 1995. Title of Information Collection: Projected Sales of Major Weapons in Support of... automated collection techniques or other forms of technology. Abstract of proposed collection: Section 25(a...

  11. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  12. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    International Nuclear Information System (INIS)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed

  13. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  14. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, Brian A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Becker, Bryan R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  15. QUEST2: Project plan for preliminary analysis/system architecture phase (PA/SA)

    International Nuclear Information System (INIS)

    Braaten, F.D.

    1995-01-01

    This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19

  16. [Efficiency of computer-based documentation in long-term care--preliminary project].

    Science.gov (United States)

    Lüngen, Markus; Gerber, Andreas; Rupprecht, Christoph; Lauterbach, Karl W

    2008-06-01

    In Germany the documentation of processes in long-term care is mainly paper-based. Planning, realization and evaluation are not supported in an optimal way. In a preliminary study we evaluated the consequences of the introduction of a computer-based documentation system using handheld devices. We interviewed 16 persons before and after introducing the computer-based documentation and assessed costs for the documentation process and administration. The results show that reducing costs is likely. The job satisfaction of the personnel increased, more time could be spent for caring for the residents. We suggest further research to reach conclusive results.

  17. Frictional sliding in layered rock model: Preliminary experiments. Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Perry, K.E. Jr.; Buescher, B.J.; Anderson, D.; Epstein, J.S.

    1995-09-01

    An important aspect of determining the suitability of Yucca Mountain as a possible nuclear waste repository requires understanding the mechanical behavior of jointed rock-masses. To this end we have studied the frictional sliding between simulated rock joints in the laboratory using the technique of phase shifting moire interferometry. The models were made from stacks of Lexan plates and contained a central hole to induce slip between the plates when the models were loaded in compression. These preliminary results confirm the feasibility of the approach and show a clear evolution of slip as function of load

  18. Heat recovery and seed recovery development project: preliminary design report (PDR)

    Energy Technology Data Exchange (ETDEWEB)

    Arkett, A. H.; Alexander, K. C.; Bolek, A. D.; Blackman, B. K.; Kurrle, P. E.; Tram, S. V.; Warren, A. M.; Ziobrowski, A. J.

    1981-06-01

    The preliminary design and performance characteristics are described of the 20 MWt heat recovery and seed recovery (HRSR) system to be fabricated, installed, and evaluated to provide a technological basis for the design of commercial size HRSR systems for coal-fired open-cycle MHD power plants. The system description and heat and material balances, equipment description and functional requirements, controls, interfacing systems, and operation and maintenance are detailed. Appendices include: (1) recommended environmental requirements for compliance with federal and state of Tennessee regulations, (2) channel and diffuser simulator, (3) equipment arrangement drawings, and (4) channel and diffuser simulator barrel drawings. (WHK)

  19. 78 FR 53001 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-08-27

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  20. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  1. 77 FR 71475 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-11-30

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before April 29, 2013. FOR... the public transportation projects listed below. The actions on the projects, as well as the laws...

  2. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before January 21, 2013. FOR... the public transportation projects listed below. The actions on these projects, as well as the laws...

  3. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  4. Preliminary uncertainty analysis of pre-waste-emplacement groundwater travel times for a proposed repository in basalt

    International Nuclear Information System (INIS)

    Clifton, P.M.; Arnett, R.C.

    1984-01-01

    Preliminary uncertainty analyses of pre-waste-emplacement groundwater travel times are presented for a potential high-level nuclear waste repository in the deep basalts beneath the Hanford Site, Washington State. The uncertainty analyses are carried out by means of a Monte Carlo technique, which requires the uncertain inputs to be described as either random variables or spatial stochastic processes. Pre-waste-emplacement groundwater travel times are modeled in a continuous, flat-lying basalt flow top that is assumed to overlie the repository horizon. Two-dimensional, steady state groundwater flow is assumed, and transmissivity, effective thickness, and regional hydraulic gradient are considered as uncertain inputs. Groundwater travel time distributions corresponding to three groundwater models are presented and compared. Limitations of these preliminary simulation results are discussed in detail

  5. A preliminary investigation on the effects of characteristics and contractual behaviour on civil engineering project performance

    Science.gov (United States)

    Ismail, W. N. W.; Adnan, H.; Yusuwan, N.; Maisham, M.; Hassan, A. A.

    2018-02-01

    The significant role of civil engineering project is not only to make the lives of people easier and secure but also to trigger the economic growth by providing infrastructure facilities as well as job opportunities. As it is dominantly initiated by government sectors, performance of the civil engineering projects is always observed. This study aims to investigate the characteristics of civil engineering project and the contractual behavior of the key participants and how do these two factors affect civil engineering projects performance. Literature reviews, content analysis and questionnaires survey were conducted to undertake the research. A total of 50 questionnaires were distributed and 10 questionnaires were returned, resulting in a 20% response rate. The research unveiled that performance of civil engineering projects are influenced greatly by the ability to handle the unpredictable character of the civil engineering projects and adequate behavioral management. Apart from that, balancing the factors with high quality of workmanship, avoidance or well managed conflicts and high satisfaction level will ensure performance in projects.

  6. HAD 2020 Project: A proposal to consolidate hospital-based home care in Spain

    Directory of Open Access Journals (Sweden)

    Oriol Estrada Cuxart

    2017-04-01

    Full Text Available Hospital at home (HAH appeared in Spain 36 years ago with the opening of several units. The initial push was truncated by the lack of political leadership and sometimes clinical as well. The current reality offers an irregular implementation with a wide disparity of assistance and resource models. The Sociedad Española de Hospitalización a Domicilio (SEHAD has not played either the expected scientific or professional leadership roles. The “Plan HAD2020: key of the future” was designed as revulsive. This is an ambitious 4-year project to consolidate HAH as a care modality. Its deployment consists of five phases. Preparation: the foundations of the strategic plan (EP were established. Situation analysis: a national survey was carried out on the 106 operational units (data 2014. Validation of the EP: contributions and proposals of action of the members of SEHAD. National Congress 2016: presentation and approval of EP conclusions and proposals. EP deployment phase: it will be extended until 2020 and will be executed by various teams of referents spread over five lines of work. The final objective set for the year 2020 is: to come up with a more homogenous care model; to promote the training and professional recognition of those who work in the HAD; that each hospital in Spain has a HAH unit; recognition and empowerment by the national health system. HAD2020 has marked an inflection point in the SEHAD. The traced path and the effort of all the HAH professionals will allow reaching the vision which the pioneers of the HAH in Spain pursued.

  7. An Aerial Radiological Survey of the Yucca Mountain Project Proposed Land Withdrawal and Adjacent Areas

    International Nuclear Information System (INIS)

    Craig Lyons, Thane Hendricks

    2006-01-01

    An aerial radiological survey of the Yucca Mountain Project (YMP) proposed land withdrawal was conducted from January to April 2006, and encompassed a total area of approximately 284 square miles (73,556 hectares). The aerial radiological survey was conducted to provide a sound technical basis and rigorous statistical approach for determining the potential presence of radiological contaminants in the Yucca Mountain proposed Land withdrawal area. The survey site included land areas currently managed by the Bureau of Land Management, the U.S. Air Force as part of the Nevada Test and Training Range or the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as part of the Nevada Test Site (NTS). The survey was flown at an approximate ground speed of 70 knots (36 meters per second), at a nominal altitude of 150 ft (46 m) above ground level, along a set of parallel flight lines spaced 250 ft (76 m) apart. The flight lines were oriented in a north-south trajectory. The survey was conducted by the DOE NNSA/NSO Remote Sensing Laboratory-Nellis, which is located in Las Vegas, Nevada. The aerial survey was conducted at the request of the DOE Office of Civilian Radioactive Waste Management. The primary contaminant of concern was identified by YMP personnel as cesium-137 ( 137 Cs). Due to the proposed land withdrawal area's proximity to the historical Nuclear Rocket Development Station (NRDS) facilities located on the NTS, the aerial survey system required sufficient sensitivity to discriminate between dispersed but elevated 137 Cs levels from those normally encountered from worldwide fallout. As part of that process, the survey also measured and mapped the exposure-rate levels that currently existed within the survey area. The inferred aerial exposure rates of the natural terrestrial background radiation varied from less than 3 to 22 microroentgens per hour. This range of exposure rates was primarily due to the surface

  8. A proposal to improve ecological compensation practice in road and railway projects in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Villarroya, Ana, E-mail: avillarroya@alumni.unav.es; Puig, Jordi, E-mail: jpbaguer@unav.es

    2013-09-15

    To reduce ecological impacts caused by development projects, avoidance, minimization and compensation techniques have to be taken together into consideration along Environmental Impact Assessment (EIA) procedures. This paper explores the particular role that ecological compensation has had in recent road and railway EIA procedures in Spain, as seen through the review of a set of recent EIA Records of Decision (RODs) that confirms precedent findings. Noticing that residual impacts are not paid much attention, and that there is no evidence of a solid public participation in ecological impact evaluation, it proposes to increase the awareness on residual impacts, as a way to make easier public access to the allegedly most sensitive moment of EIA implementation: (residual) impact evaluation. -- Highlights: ► Ecological compensation practice in Spain is much lower than avoidance or mitigation. ► Residual impacts are overlooked in EIA processes and public participation is low. ► An increased awareness of residual impacts may also promote public participation. ► Current context needs these small steps to move towards better compensation practice.

  9. HTGR reactor physics, thermal-hydraulics and depletion uncertainty analysis: a proposed IAEA coordinated research project

    International Nuclear Information System (INIS)

    Tyobeka, Bismark; Reitsma, Frederik; Ivanov, Kostadin

    2011-01-01

    The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of HTGR design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. The predictive capability of coupled neutronics/thermal hydraulics and depletion simulations for reactor design and safety analysis can be assessed with sensitivity analysis and uncertainty analysis methods. In order to benefit from recent advances in modeling and simulation and the availability of new covariance data (nuclear data uncertainties) extensive sensitivity and uncertainty studies are needed for quantification of the impact of different sources of uncertainties on the design and safety parameters of HTGRs. Uncertainty and sensitivity studies are an essential component of any significant effort in data and simulation improvement. In February 2009, the Technical Working Group on Gas-Cooled Reactors recommended that the proposed IAEA Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modeling be implemented. In the paper the current status and plan are presented. The CRP will also benefit from interactions with the currently ongoing OECD/NEA Light Water Reactor (LWR) UAM benchmark activity by taking into consideration the peculiarities of HTGR designs and simulation requirements. (author)

  10. Preliminary draft: environmental impact statement for Hot Engineering Test Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Boyle, J.W.; Baxter, B.J.; Carpenter, J.A.

    1978-08-01

    The project considered is the Hot Engineering Test Project (HETP), which is to be located in largely existing facilities at Oak Ridge National Laboratory (ORNL). The project is a part of the National High Temperature Gas-Cooled Reactor Fuel Recycle Program, which seeks to demonstrate the technological feasibility of the recycle processes. The HETP will attempt to confirm the operability of the processes (proven feasible in cold or nonradioactive, benchtop experimentation) under the more realistic radioactive condition. As such, the operation will involve the reprocessing and refabrication of spent HTGR fuel rods obtained from the Fort St. Vrain reactor. The reference fuel is highly enriched uranium. No significant radiological impacts are expected from routine operation of the facility to any biota or ecosystem. Concentrations of one or more radionuclides in Whiteoak Lake will increase as a result of the combination of HETP wastes with other ORNL wastes. Nonradiological effects from construction activities and routine operation should be insignificant on land and water use and on terrestrial and aquatic ecosystems. No significant socioeconomic impacts should occur from either construction or operation of the facility. Some conservative accident scenarios depict significant releases of radioactivity. Effects should be localized and would not be severe for all but the most unlikely of such incidents. No significant long-term commitment of resources is expected to be required for the project. Nor are any large quantities of scarce or critical resources likely to be irreversibly or irretrievably committed to the project. Principal alternatives considered were: relocation of the project site, postponement of the project schedule, project cancellation, and chemical process variations

  11. Preliminary publications book 2 from project on mineral resources, metallogenesis, and tectonics of northeast Asia

    Science.gov (United States)

    Nokleberg, Warren J.; Miller, Robert J.; Naumova, Vera V.; Khanchuk, Alexander I.; Parfenov, Leonid M.; Kuzmin, Mikhail I.; Bounaeva, Tatiana M.; Obolenskiy, Alexander A.; Rodionov, Sergey M.; Seminskiy, Zhan V.; Diggles, Michael F.

    2003-01-01

    This is the Web version of a CD-ROM publication. This report consists of summary major compilations and syntheses accomplished in the six-year project through April 2003 for the study on the Mineral Resources, Metallogenesis, and Tectonics of Northeast Asia (Eastern and Southern Siberia, Mongolia, Northeastern China, South Korea, and Japan). The major scientific goals and benefits of the project are to: (1) provide a comprehensive international data base on the mineral resources of the region that is the first, extensive knowledge available in English; (2) provide major new interpretations of the origin and crustal evolution of mineralizing systems and their host rocks, thereby enabling enhanced, broad-scale tectonic reconstructions and interpretations; and (3) promote trade and scientific and technical exchanges between the North America and Northeast Asia. Data from the project are providing sound scientific data and interpretations for commercial firms, governmental agencies, universities, and individuals that are developing new ventures and studies in the project area, and for land-use planning studies that deal with both mineral potential issues. Northeast Asia has vast potential for known and undiscovered mineral deposits; however, little information existed in English in the West until publication of products from this project. Consequently, data and interpretations from the project are providing basic knowledge for major scientific, commercial, national, and international endeavors by other interested individuals and groups.

  12. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume I. Executive summary

    International Nuclear Information System (INIS)

    1978-11-01

    A preliminary feasibility study of capturing energy ejected in hot water at the Savannah River Plant (SRP) is presented. The cooling water, drawn from the river or a pond at the rate of 500,000 gallons per minute, is typically heated 80 0 F to about 150 0 F and is then allowed to cool in the atmosphere. The energy added to the water is equivalent to 20 million barrels of oil a year. This study reports that the reject heat can be used directly in an organic Rankine cycle system to evaporate fluids which drive electric generators. The output of one reactor can produce 45,000 kilowatts of electricity. Since the fuel is waste heat, an estimated 45% savings over conventional electric costs is possible over a thirty year period

  13. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    Science.gov (United States)

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  14. 76 FR 45551 - Post-2014 Resource Pool; Loveland Area Projects, Proposed Power Allocation

    Science.gov (United States)

    2011-07-29

    ... Proposed Power Allocation. SUMMARY: Western Area Power Administration (Western), a Federal power marketing... Pool Proposed Power Allocation developed under the requirements of the Power Marketing Initiative of... resulted in this Notice of Proposed Power Allocation. DATES: The comment period on this Notice of Proposed...

  15. 77 FR 64586 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-10-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... actions by issuing certain approvals for the public transportation projects listed below. The actions on...

  16. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  17. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  18. Preliminary volcanic hazards evaluation for Los Alamos National Laboratory Facilities and Operations : current state of knowledge and proposed path forward

    Energy Technology Data Exchange (ETDEWEB)

    Keating, Gordon N.; Schultz-Fellenz, Emily S.; Miller, Elizabeth D.

    2010-09-01

    The integration of available information on the volcanic history of the region surrounding Los Alamos National Laboratory indicates that the Laboratory is at risk from volcanic hazards. Volcanism in the vicinity of the Laboratory is unlikely within the lifetime of the facility (ca. 50–100 years) but cannot be ruled out. This evaluation provides a preliminary estimate of recurrence rates for volcanic activity. If further assessment of the hazard is deemed beneficial to reduce risk uncertainty, the next step would be to convene a formal probabilistic volcanic hazards assessment.

  19. Preliminary project concerning the straw-fueled combined power-heat plant to be constructed at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-06-01

    Power and heat generation based on biomass gasification is of great importance due to its beneficial environmental effects and good economy. This report concerns a preliminary project on feasibility and problems of implementing a dual-purpose power plant, supplying both power and district heating to several schools, swimming pools and other public facilities at Glamsbjerg (Funen). The plant is to be based on thermal gasification (pyrolysis) of straw and use of the gas in a diesel engine. The diesels operate the power generator, and their waste heat should be utilized in the local district heating network. In order to establish a stable and flexible straw supply to the plant an evaluation of resources in the area has been carried out. Apart from straw-derived fuel the plant is planned to use natural gas for start and maintenance of the process. The prices of the combined plant and of the fuel processing are estimated in the report. (EG)

  20. Preliminary Economics Evaluation and Impact Assessment of The Agribusiness Development Project at RRC Perkerra

    International Nuclear Information System (INIS)

    Cheng'ole, J.M.

    2002-01-01

    The attainment of sustainable food security in the drought-stricken sub-Saharan Africa requires farmer participatory research into the development and adaptation of agricultural technologies and their dissemination for adoption by the farmers. The Agribusiness Development Support Project (ADSP) was initiated in the Arid and semi-arid areas (ASALs) of and surrounding Baringo District to acquire test and disseminate improved vegetable varieties, with significant farmer involvement. The project aims at commercializing horticulture and seed technologies. Three superior onion varieties have been tested on-farm and found to be higher yielding than the traditional varieties. More than 9000 improved fruit tree seedlings have been sold, and their popularity is such that, in favourable weather conditions, the Centre's nurseries cannot effectively meet the demand by farmers and groups. As a result, mechanisms to enlarge the scope of the project to cover more districts and to encourage adoption in current operational area should be affected

  1. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    Science.gov (United States)

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  2. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  3. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  4. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  5. Effects of childhood malignancy treatment on quality of life: Preliminary results of the QOLOP project

    Czech Academy of Sciences Publication Activity Database

    Blatný, Marek; Kepák, T.; Jelínek, Martin; Slezáčková, Alena; Vlčková, I.; Navrátilová, P.; Pilát, M.; Kárová, Š.; Hrstková, H.; Štěrba, J.

    2008-01-01

    Roč. 1, č. 1 (2008), s. 10-15 R&D Projects: GA ČR 406/07/1384 Institutional research plan: CEZ:AV0Z70250504 Keywords : cancer * quality of life * childhood Subject RIV: AN - Psychology http://www.spao.eu/archive/2008/spao2008_effects_of_childhood_malignancy_treatment_on_quality_of_life.pdf

  6. Proposed approach for developing process-based KPIs for project control during the pre-project stage

    NARCIS (Netherlands)

    Haponava, T.; Al-Jibouri, Saad H.S.; Mawdesley, M.; Ahmed, Syed M.; Azhar, Salman; Mohamed, Sherif

    2007-01-01

    In recent years a great deal of attention has been made to measuring different aspects of construction project performance. Some of the tools used for this purpose are the Key Performance Indicators (KPIs). The main shortcoming of these however is that most of them are end product oriented and hence

  7. WSSRAP [Weldon Spring Site Remedial Action Project] quarry preliminary engineering report

    International Nuclear Information System (INIS)

    1990-01-01

    The removal, transport, and temporary storage of radiologically and chemically contaminated bulk waste from the Weldon Spring Quarry will be accomplished by dividing the work into three subcontract packages. The major portion of the work will come under the bulk waste excavation package; construction of a temporary storage area (TSA) at the Weldon Spring Chemical Plant and of a haul road between the quarry and the TSA comprise the other two packages. Cost estimates to complete the removal range from $5 million to $9.4 million due to a high degree of uncertainty regarding both the productivity of the excavating equipment and the effectiveness of planned dewatering efforts. Quarry wastes will be substantially dewatered and the water treated before discharge. Waste will be excavated in three phases, using conventional construction equipment, with preliminary sorting of waste at the quarry before transport to the TSA. Special attention will be given to controlling the spread of contamination by careful monitoring and control of surface and groundwater drainage and of particulate and radiological contamination of the air. 6 refs., 21 figs., 8 tabs

  8. Drift design methodology and preliminary application for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Hardy, M.P.; Bauer, S.J.

    1991-12-01

    Excavation stability in an underground nuclear waste repository is required during construction, emplacement, retrieval (if required), and closure phases to ensure worker health and safety, and to prevent development of potential pathways for radionuclide migration in the post-closure period. Stable excavations are developed by appropriate excavation procedures, design of the room shape, design and installation of rock support reinforcement systems, and implementation of appropriate monitoring and maintenance programs. In addition to the loads imposed by the in situ stress field, the repository drifts will be impacted by thermal loads developed after waste emplacement and, periodically, by seismic loads from naturally occurring earthquakes and underground nuclear events. A priori evaluation of stability is required for design of the ground support system, to confirm that the thermal loads are reasonable, and to support the license application process. In this report, a design methodology for assessing drift stability is presented. This is based on site conditions, together with empirical and analytical methods. Analytical numerical methods are emphasized at this time because empirical data are unavailable for excavations in welded tuff either at elevated temperatures or under seismic loads. The analytical methodology incorporates analysis of rock masses that are systematically jointed, randomly jointed, and sparsely jointed. In situ thermal and seismic loads are considered. Methods of evaluating the analytical results and estimating ground support requirements for all the full range of expected ground conditions are outlines. The results of a preliminary application of the methodology using the limited available data are presented. 26 figs., 55 tabs

  9. Hydrological and geological preliminary studies in the scope of the RMB project

    International Nuclear Information System (INIS)

    Ferreira, Vinicius V.M.; Barreto, Alberto A.; Aleixo, Bruna L.

    2011-01-01

    The RMB - Brazilian Multipurpose Reactor is a project that will contribute decisively in order to develop the science and the technology of the country. However, the licensing process of this facility is not a simple task, since it involves nuclear and environmental questions. The utilization of geoprocessing tools became in the last years an important technique to aid the development of several studies, and will be necessary also in this project. The objective of this work is to present the first hydrological and geological geoprocessing studies done in order to support the future environmental licensing process of the facility. The results show that further efforts should be done since there is a lack of many data needed for the next steps. (author)

  10. The Moon Zoo citizen science project: Preliminary results for the Apollo 17 landing site

    OpenAIRE

    Bugiolacchi, Roberto; Bamford, Steven; Tar, Paul; Thacker, Neil; Crawford, Ian A.; Joy, Katherine H.; Grindrod, Peter M.; Lintott, Chris

    2016-01-01

    Moon Zoo is a citizen science project that utilises internet crowd-sourcing techniques. Moon Zoo users are asked to review high spatial resolution images from the Lunar Reconnaissance Orbiter Camera (LROC), onboard NASA’s LRO spacecraft, and perform characterisation such as measuring impact crater sizes and identify morphological ‘features of interest’. The tasks are designed to address issues in lunar science and to aid future exploration of the Moon. We have tested various methodologies and...

  11. Educational Television Via Satellite: Studies of Antecedents and Projects, Preliminary Plan. Volume One.

    Science.gov (United States)

    Comision Nacional de Investigaciones Espaciales, Buenos Aires (Argentina).

    A proposed satellite-aided educational television (ETV) system for Argentina is described in this Spanish-language report. The requirements and advantages of such a system are discussed, and some other studies of satellite-aided ETV are summarized. International and legal considerations, and problems of integrating existing Argentine TV stations…

  12. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  13. Preliminary evaluation of the physical impacts of a nearshore sand extraction project

    International Nuclear Information System (INIS)

    Anctil, F.; Ouellet, Y.

    1991-01-01

    A review is presented of the potential physical impacts of a nearshore sand extraction project in the Gulf of St. Lawrence. In Canada, sand extraction is mainly limited to the Beaufort Sea area, where in 1982 alone 15 million tonnes of aggregate was dredged to satisfy the requirements of offshore petroleum exploration; but there is much experience in nearshore dredging in Europe. Criteria related to impacts, developed for conditions prevailing in the North Sea (England) and the Gulf of Gascogne (France) are adapted to meet the more moderate hydrodynamic impacts of an extraction project in the Gulf of St. Lawrence. Potential impacts of extraction projects include destruction of sand bars or dunes, direct erosion resulting from beach drawdown or sedimentation interference, and impacts on littoral drift due to modified wave refraction patterns. Three schemes for the sand extraction are considered, and from the results, a fourth scheme is elaborated in such a way as to limit the negative impacts to the minor category. 17 refs., 5 figs., 4 tabs

  14. White Paper on Data Repository Reorganization Proposal for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B [ORNL; Williams, Paul T [ORNL; Bass, Bennett Richard [ORNL

    2012-09-01

    As the xLPR project moves along, it is important to properly manage the knowledge generated by the different groups. We focus specifically on the knowledge and communications written in files, including general documents, source code and executable files. Data generated through the project are different in nature and, for this reason, need to be treated differently. To that end, ORNL put in place a series of tools that facilitate proper storage and management of project data, document and code changes, group collaboration, knowledge transfer, transparency, accountability and auditability. This paper describes the approaches/tools that we recommend for moving the project forward on knowledge management.

  15. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  16. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  17. The Italian bat roost project: a preliminary inventory of sites and conservation perspectives

    Directory of Open Access Journals (Sweden)

    Gruppo Italiano di Ricerca sui Chirotter GIRC

    2005-01-01

    Full Text Available Abstract The Italian bat roost project, launched by the Italian Chiroptera Research Group (GIRC, aims to develop a constantly updated national database of bat roosts. Short-term objectives are to inventory roosts and identify the most important ones from a conservation perspective, in order to set priorities for management actions. Published records and field data from 1990 onwards are filed. To date, the database contains 1243 records from 750 roosts, covering 352 10x10 km UTM grid-cells. Among roosts, 167 were used for hibernation (S roosts, 244 for breeding (R roosts and 431 as either temporary roosts or for unknown needs, not verified or not considered in the survey (X roosts. Roosting sites occurred in buildings (45.1%, caves (35.3%, artificial underground sites (10.3%, trees (5.5%, bridges (2.1%, bat boxes (1.3% and rocky cliffs (0.4%. At least 29 species were found, and the number of roosts per species ranged between 1 and 261. S and/or R roosts fulfilling certain combinations of number of species and individuals or having at least 50 individuals of species cited in Annex II of the 92/43/EEC Directive (excluding Miniopterus schreibersii, adding Myotis punicus were classified as sites of special conservation interest. When meeting at least one such conditions, type X roosts that were not classified as either S or R, were considered potential sites of special conservation interest, for which further data collection is recommended. In all, 97 roosts of special conservation interest were identified: 30 S roosts, 60 R roosts and 7 roosts selected for both hibernation and breeding. 20 X roosts were identified as potential sites of special conservation interest. For at least 93.7% of roosts, factors potentially harming the bats were documented, particularly people access to the roost, and renovation of buildings used as a roost. In almost two thirds of such cases it was judged that conservation was not ensured

  18. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  19. Assessment of wind turbine wake-effects in the proposed "Markerwaard" wind/hydro project

    NARCIS (Netherlands)

    Vermeulen, P.E.J.; Builtjes, P.J.H.; Vijge, J.B.A.; Smet, L. de

    1980-01-01

    Figure I gives on overview of the location of the "Markerwaard" area within the "IJsselmeer" lake in the middle of the Netherlands. This area is the last part of the large reclamation project in the "IJsselmeer" lake. This project has resulted thus far in the realisation of four polders of roughly

  20. 75 FR 79008 - Proposed Collection; Comment Request; Study of Substance Abuse doc.com Module Project

    Science.gov (United States)

    2010-12-17

    ... referral to treatment for patients who abuse substances. The overall goal of this project is to assess the... provide significant services directly to the public to survey customers to determine the kind and quality of services they want and their level of satisfaction with existing services. The project will...

  1. Preliminary project of s Thomson scattering system for the ETE tokamak; Projeto preliminar de um sistema de espalhamento Thomson para o Tokamak ETE

    Energy Technology Data Exchange (ETDEWEB)

    Berni, Luiz Angelo

    1997-12-31

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light 4 refs., 26 figs.

  2. Preliminary results from the ESA STSE project on SST diurnal variability, its regional extent and implications in atmospheric modelling (SSTDV:R.EX.–IM.A.M.)

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Hasager, Charlotte Bay; Høyer, Jacob L.

    2013-01-01

    This study presents some preliminary results of the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). Comparisons of SEVIRI SST with AATSR...

  3. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  4. Preliminary on-surface experiments for backfilling a HLW repository: the ESDRED project

    International Nuclear Information System (INIS)

    Bastiaens, W.

    2007-01-01

    ESDRED is a technological integrated project within the context of the Sixth Framework Program of EURATOM. The project aims to demonstrate the technical feasibility at an industrial scale of specific technologies related to the construction, operation and closure of a deep geological repository for spent fuel and long-lived radioactive waste. The Belgian design for high level waste disposal is based on the so-called Supercontainer concept. Within this concept, the waste is encased in a carbon steel overpack, which is consequently fitted into a 70 cm thick concrete shell, in its turn enveloped by a stainless steel liner. A Supercontainer measures about 2 m in diameter. In the design of the repository, the Supercontainers will be emplaced, one after the other, in disposal galleries. The space between the Supercontainers and the gallery lining needs to be filled up with a solid material. The most essential function of this component, referred to as backfill, is to prevent a collapse of the gallery. A secondary function is to limit the presence of free oxygen, to limit corrosion. In the ESDRED project EIG EURIDICE, together with SCK-CEN and ONDRAF/NIRAS, investigates technologies to apply the backfill. Two options to apply the backfill were investigated within the ESDRED project: fill the gap with a granular material and backfill the gap with a grout. The prime operational target will be to achieve a 100 percent filling of the gap. A wide variety of materials was tested. A number of considerations regarding long-term safety and operational feasibility impose constraints on the backfill component:it should preserve the corrosion-protective environment established by the Supercontainer; it should not act as a thermal isolator; it should not introduce organic materials that can give rise to the formation of migration-enhancing complexes between radionuclides and soluble organic compounds; it should be feasible to construct at a sufficiently high rate; the strength of the

  5. Isotope detectors and radiation detectors for test reliability techniqui. A preliminary project

    International Nuclear Information System (INIS)

    Christell, R.

    1977-03-01

    A survey is done of small and simple components for use as detectors for ionizing radiation, as well as different methods and components producing images of radiation fields based on position sensitive detectors. The investigation has resulted in a system for detection of stones in wood. In a second project isotope excited x ray fluorescence has been used for analysis of material resulting from wear of mechanical components. A facility for analysis has been built and test analysis has been performed. Methods for continous wear control with possibility to forecast breakdowns have been investigated. (K.K.)

  6. Preliminary project definition for long duration. Tests of coal fired MHD generators

    International Nuclear Information System (INIS)

    Van der Laken, R.A.

    1992-01-01

    In its final report the Faraday Working Group recommended the CEC amongst others to explore the possibility of a long duration test of a 'state-of-the-art', MHD-generator in order to remove uncertainties concerning the lifetime and availability of such a generator design. The duration of the test should be several thousands of hours, considerably more than the duration tests carried out until now. The scope of the present study is to prepare a project definition document for a long duration test of a coal fired, state-of-the-art MHD-generator

  7. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  8. 77 FR 31037 - Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in...

    Science.gov (United States)

    2012-05-24

    ...; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in... of up to 2 years. This is for the purpose of processing one solar energy right-of-way (ROW) application submitted by Pacific Solar Investments, LLC, to construct and operate the Hyder Valley Solar...

  9. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  10. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  11. 77 FR 74845 - AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit

    Science.gov (United States)

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115-001] AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit Take notice that AJT Mining Properties, Inc., permittee for the proposed Yeldagalga Creek Hydroelectric Project, has requested that its preliminary permit...

  12. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    Huber, T.E.

    1995-01-01

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  13. Preliminary safety equipment list for Tank 241-C-106 Manipulator Retrieval System, Project W-340

    International Nuclear Information System (INIS)

    Guthrie, R.L.

    1994-01-01

    This document identifies the anticipated safety classification of the estimated major subsystems, based on the projected major functions, that will be used as guidance for the development of the conceptual design of the Manipulator Retrieval System for Tank 241-C-106. This document is intended to be updated as the design of the Manipulator Retrieval System evolves through the conceptual and definitive design phases. The Manipulator Retrieval System is to be capable of removing the hardened sludge heel at the bottom of single shell Tank 241-C-106 and to perform an overall clean out of the tank that leaves a maximum of 360 ft 3 (TPA milestone M-45-00). The thickness of the heel prior to initiation of waste retrieval with the Manipulator Retrieval System is estimated to be 1- to 2-ft. The Manipulator Retrieval System is currently in the pre-conceptual phase with no definitive systems or subsystems. The anticipated retrieval functions for the Manipulator Retrieval System is based on Table 6-2 of WHC-SD-W340-ES-001, Rev. 1. Projected equipment to accomplish these functions were based on the following systems and equipment: Rotary Mode Core Sampling Equipment (WHC-SD-WM-SEL-032); Light Duty Utility Arm System Equipment (WHC-SD-WM-SEL-034); Single Shell Tanks Equipment (WHC-SD-WM-SEL-020)

  14. Projecting the self into the future in individuals with schizophrenia: a preliminary cross-sectional study.

    Science.gov (United States)

    Raffard, Stéphane; Bortolon, Catherine; D'Argembeau, Arnaud; Gardes, Jeanne; Gely-Nargeot, Marie-Christine; Capdevielle, Delphine; Van der Linden, Martial

    2016-07-01

    The ability to project oneself into the future contributes to development and maintenance of a coherent sense of identity. If recent research has revealed that schizophrenia is associated with difficulties envisioning the future, little is known about patients' future self-representations. In this study, 27 participants with schizophrenia and 26 healthy controls were asked to simulate mental representations of plausible and highly significant future events (self-defining future projections, SDFPs) that they anticipate to happen in their personal future. Main results showed that schizophrenia patients had difficulties in reflecting on the broader meaning and implications of imagined future events. In addition, and contrary to our hypothesis, a large majority of SDFPs in schizophrenia patients were positive events, including achievements, relationship, and leisure contents. Interestingly, patients and controls did not differ on the perceived probability that these events will occur in the future. Our results suggest that schizophrenia patients have an exaggerated positive perception of their future selves. Together, these findings lend support to the idea that past and future self-defining representations have both similar and distinct characteristics in schizophrenia.

  15. Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

    Directory of Open Access Journals (Sweden)

    Cristofer André Caous

    2012-06-01

    Full Text Available Objective: To propose a measure (index of expected risks to evaluateand follow up the performance analysis of research projects involvingfinancial and adequate structure parameters for its development.Methods: A ranking of acceptable results regarding researchprojects with complex variables was used as an index to gauge aproject performance. In order to implement this method the ulcerindex as the basic model to accommodate the following variableswas applied: costs, high impact publication, fund raising, and patentregistry. The proposed structured analysis, named here as RoSI(Return on Scientific Investment comprises a pipeline of analysis tocharacterize the risk based on a modeling tool that comprises multiplevariables interacting in semi-quantitatively environments. Results:This method was tested with data from three different projects in ourInstitution (projects A, B and C. Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C related to development and expected results according to initial or full investment. Conclusion: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  16. Preliminary assessment of the nuclide migration from the activation zone around the proposed Spallation Neutron Source facility

    International Nuclear Information System (INIS)

    Dole, L.R.

    1998-09-01

    The purpose of this study is to investigate the potential impacts of migrating radionuclides from the activation zone around the proposed Spallation Neutron Source (SNS). Using conservatively high estimates of the potential inventory of radioactive activation products that could form in the proposed compacted-soil shield berm around an SNS facility on the Oak Ridge Reservation (ORR), a conservative, simplified transport model was used to estimate the potential worst-case concentrations of the 12 long-lived isotopes in the groundwater under a site with the hydrologic characteristics of the ORR

  17. Preliminary assessment of the nuclide migration from the activation zone around the proposed Spallation Neutron Source facility

    Energy Technology Data Exchange (ETDEWEB)

    Dole, L.R.

    1998-09-01

    The purpose of this study is to investigate the potential impacts of migrating radionuclides from the activation zone around the proposed Spallation Neutron Source (SNS). Using conservatively high estimates of the potential inventory of radioactive activation products that could form in the proposed compacted-soil shield berm around an SNS facility on the Oak Ridge Reservation (ORR), a conservative, simplified transport model was used to estimate the potential worst-case concentrations of the 12 long-lived isotopes in the groundwater under a site with the hydrologic characteristics of the ORR.

  18. A coupled mechanical-hydrological investigation of crystalline rocks: Annual technical progress report, proposed test matrix, and preliminary results

    International Nuclear Information System (INIS)

    Bastian, R.J.; Voss, C.F.; Apted, M.J.; Shotwell, L.R.

    1988-02-01

    This report reviews the Fracture Flow Behavior in Rock Study being performed at the Pacific Northwest Laboratory. The study's objective is to determine the feasibility of predicting mechanical-hydrological behavior of natural rock fractures by accurately characterizing fracture surface topography and mineralization. A laboratory-scale facility is currently being used to ensure optimum control of variables. Devising a technique to study small-scale samples is the first step to understanding the complex coupled processes encountered in geomechanics and hydrology. The major accomplishments during fiscal year 1987 were initial development of the innovative testing method, identification of appropriate specimens, substantial renovation to the facility, completion of several sets of experiments, and procurement of hardware components for a laser-imaging device used to characterize fracture surfaces. A complete set of preliminary results and findings is presented in this report. These results, gathered from a basalt core with a natural fracture, have demonstrated that the methodology is valid, and definite trends in the data are readily apparent. 10 refs., 14 figs., 1 tab

  19. Preliminary design requirements document (DRD) for Project W-236B, ''Initial Pretreatment Module''

    International Nuclear Information System (INIS)

    Swanson, L.M.

    1995-01-01

    The scope of this Design Requirements Document (DRD) is to identify and define the functions, with associated requirements, which must be performed to separate Hanford Site tank waste supernatants into low-level and high-level fractions. This documents sets forth function requirements, performance requirements, and design constraints necessary to begin conceptual design for the Initial Pretreatment Module (IPM). System and physical interfaces between the IPM project and the Tank Waste Remediation System (TWRS) are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. Supplemental DRDs will be prepared to provide more detailed requirements specific to systems described in the DRD

  20. High Temperature Gas-Cooled Reactor Projected Markets and Preliminary Economics

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick

    2011-08-01

    This paper summarizes the potential market for process heat produced by a high temperature gas-cooled reactor (HTGR), the environmental benefits reduced CO2 emissions will have on these markets, and the typical economics of projects using these applications. It gives examples of HTGR technological applications to industrial processes in the typical co-generation supply of process heat and electricity, the conversion of coal to transportation fuels and chemical process feedstock, and the production of ammonia as a feedstock for the production of ammonia derivatives, including fertilizer. It also demonstrates how uncertainties in capital costs and financial factors affect the economics of HTGR technology by analyzing the use of HTGR technology in the application of HTGR and high temperature steam electrolysis processes to produce hydrogen.

  1. Small scale observation of magnetopause motion: preliminary results of the INTERBALL project

    Directory of Open Access Journals (Sweden)

    J. Safrankova

    Full Text Available Two satellites of the INTERBALL project were launched on 3 August 1995. The main goals of the present paper are (1 to give a brief information about the VDP plasma device onboard the INTERBALL-1 satellite, (2 to present the Faradays cup data taken in different magnetospheric regions and (3 to expose first results of the two satellite measurements of the magnetopause motion. The presented data illustrate magnetopause crossings as seen by two satellites when separated by about ~ 1000 km. This separation combined with the Faraday's cup time resolution allows to estimate the velocity of the magnetopause and to reconstruct a possible structure of the boundary. Simultaneous measurement of the magnetic field supports the interpretation of the observed ion fluxes as a signature of the wavy motion of the boundary.

  2. Preliminary report from the World Health Organisation Chest Radiography in Epidemiological Studies project

    Energy Technology Data Exchange (ETDEWEB)

    Mahomed, Nasreen [University of the Witwatersrand, Department of Radiology, Johannesburg (South Africa); University of the Witwatersrand, Medical Research Council: Respiratory and Meningeal Pathogens Research Unit, Johannesburg (South Africa); Fancourt, Nicholas [Johns Hopkins Bloomberg School of Public Health, Baltimore (United States); Murdoch Children' s Research Institute, Melbourne (Australia); De Campo, John; De Campo, Margaret [Murdoch Children' s Research Institute, Melbourne (Australia); Melbourne University, Melbourne (Australia); Akano, Aliu [Department of Radiology National Hospital, Abuja (Nigeria); Medical Research Council, Gambia (South Africa); Cherian, Thomas [World Health Organization, Geneva (Switzerland); Cohen, Olivia G. [Johns Hopkins Bloomberg School of Public Health, Baltimore (United States); World Health Organization, Geneva (Switzerland); Greenberg, David [Soroka University Medical Center, Beer-Sheva (Israel); Lacey, Stephen [Murdoch Children' s Research Institute, Melbourne (Australia); Kohli, Neera [King George Medical University, Lucknow (India); Lederman, Henrique M. [Paulista School of Medicine, Hospital Sao Paulo, Sao Paulo (Brazil); Madhi, Shabir A. [University of the Witwatersrand, Medical Research Council: Respiratory and Meningeal Pathogens Research Unit, Johannesburg (South Africa); University of the Witwatersrand, Department of Science and Technology/National Research Foundation: Vaccine Preventable Diseases, Johannesburg (South Africa); Manduku, Veronica [Kenya Medical Research Institute (KEMRI), Nairobi (Kenya); McCollum, Eric D. [Johns Hopkins School of Medicine, Eudowood Division of Pediatric Respiratory Sciences, Baltimore (United States); Johns Hopkins Bloomberg School of Public Health, Baltimore (United States); Park, Kate [Oxford University Hospitals NHS Foundation Trust, Oxford (United Kingdom); Ribo-Aristizabal, Jose Luis [Hospital Sant Joan de Deu, Barcelona (Spain); Bar-Zeev, Naor [University of Malawi, Malawi-Liverpool-Wellcome Trust Clinical Research Programme, College of Medicine, Blantyre (Malawi); University of Liverpool, Centre for Global Vaccine Research, Liverpool (United Kingdom); O' Brien, Katherine L. [Johns Hopkins Bloomberg School of Public Health, Baltimore (United States); Mulholland, Kim [Murdoch Children' s Research Institute, Melbourne (Australia); London School of Hygiene and Tropical Medicine, London (United Kingdom)

    2017-10-15

    Childhood pneumonia is among the leading infectious causes of mortality in children younger than 5 years of age globally. Streptococcus pneumoniae (pneumococcus) is the leading infectious cause of childhood bacterial pneumonia. The diagnosis of childhood pneumonia remains a critical epidemiological task for monitoring vaccine and treatment program effectiveness. The chest radiograph remains the most readily available and common imaging modality to assess childhood pneumonia. In 1997, the World Health Organization Radiology Working Group was established to provide a consensus method for the standardized definition for the interpretation of pediatric frontal chest radiographs, for use in bacterial vaccine efficacy trials in children. The definition was not designed for use in individual patient clinical management because of its emphasis on specificity at the expense of sensitivity. These definitions and endpoint conclusions were published in 2001 and an analysis of observer variation for these conclusions using a reference library of chest radiographs was published in 2005. In response to the technical needs identified through subsequent meetings, the World Health Organization Chest Radiography in Epidemiological Studies (CRES) project was initiated and is designed to be a continuation of the World Health Organization Radiology Working Group. The aims of the World Health Organization CRES project are to clarify the definitions used in the World Health Organization defined standardized interpretation of pediatric chest radiographs in bacterial vaccine impact and pneumonia epidemiological studies, reinforce the focus on reproducible chest radiograph readings, provide training and support with World Health Organization defined standardized interpretation of chest radiographs and develop guidelines and tools for investigators and site staff to assist in obtaining high-quality chest radiographs. (orig.)

  3. Preliminary analysis of accidents on the Santa QuitÉria Project: occupationally exposed individuals

    Energy Technology Data Exchange (ETDEWEB)

    Anjos, Gullit Diego C. dos, E-mail: gullitcardoso@inb.gov.br [Indústrias Nucleares do Brasil (INB), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    The Santa Quitéria Project (PSQ) is an enterprise that aims at the production of phosphate compounds as main products, and of uranium concentrates as by-products from minerals of the Itataia deposit. The intended area for implementation of the project is located in the municipality of Santa Quitéria, north central region of the State of Ceará. The U.S. Nuclear Regulatory Commission lists the basic design accidents for a Uranium Processing Plant, such as the PSQ. Among all these scenarios, fire in uranium extraction cells was the one with the highest doses released. For simulation of the fire event, the atmospheric dispersion model used was the standard Gaussian plume model. The doses were calculated for two sets of meteorological conditions: stability class F, with wind velocity of 1 m/s and class D stability with wind velocity of 4.5 m/s. For PSQ, it was considered that there will be no public individual until after 2000 meters from the release point. The doses corresponding to the occupationally exposed individuals are: 2.0E-3 mSv (class D) and 5 mSv (Class F), 300 meters away from the event. Analyzing the results, it can be concluded that there are no significant radiological consequences for the occupationally exposed individual, both in the stability class D and the F. The doses of the workers are well below the levels that could cause deterministic effects. Even if an occupationally exposed individual were exposed for 12 hours in the center of the plume, the dose received would not exceed the annual limit established by CNEN. (author)

  4. Preliminary report from the World Health Organisation Chest Radiography in Epidemiological Studies project.

    Science.gov (United States)

    Mahomed, Nasreen; Fancourt, Nicholas; de Campo, John; de Campo, Margaret; Akano, Aliu; Cherian, Thomas; Cohen, Olivia G; Greenberg, David; Lacey, Stephen; Kohli, Neera; Lederman, Henrique M; Madhi, Shabir A; Manduku, Veronica; McCollum, Eric D; Park, Kate; Ribo-Aristizabal, Jose Luis; Bar-Zeev, Naor; O'Brien, Katherine L; Mulholland, Kim

    2017-10-01

    Childhood pneumonia is among the leading infectious causes of mortality in children younger than 5 years of age globally. Streptococcus pneumoniae (pneumococcus) is the leading infectious cause of childhood bacterial pneumonia. The diagnosis of childhood pneumonia remains a critical epidemiological task for monitoring vaccine and treatment program effectiveness. The chest radiograph remains the most readily available and common imaging modality to assess childhood pneumonia. In 1997, the World Health Organization Radiology Working Group was established to provide a consensus method for the standardized definition for the interpretation of pediatric frontal chest radiographs, for use in bacterial vaccine efficacy trials in children. The definition was not designed for use in individual patient clinical management because of its emphasis on specificity at the expense of sensitivity. These definitions and endpoint conclusions were published in 2001 and an analysis of observer variation for these conclusions using a reference library of chest radiographs was published in 2005. In response to the technical needs identified through subsequent meetings, the World Health Organization Chest Radiography in Epidemiological Studies (CRES) project was initiated and is designed to be a continuation of the World Health Organization Radiology Working Group. The aims of the World Health Organization CRES project are to clarify the definitions used in the World Health Organization defined standardized interpretation of pediatric chest radiographs in bacterial vaccine impact and pneumonia epidemiological studies, reinforce the focus on reproducible chest radiograph readings, provide training and support with World Health Organization defined standardized interpretation of chest radiographs and develop guidelines and tools for investigators and site staff to assist in obtaining high-quality chest radiographs.

  5. Preliminary report from the World Health Organisation Chest Radiography in Epidemiological Studies project

    International Nuclear Information System (INIS)

    Mahomed, Nasreen; Fancourt, Nicholas; De Campo, John; De Campo, Margaret; Akano, Aliu; Cherian, Thomas; Cohen, Olivia G.; Greenberg, David; Lacey, Stephen; Kohli, Neera; Lederman, Henrique M.; Madhi, Shabir A.; Manduku, Veronica; McCollum, Eric D.; Park, Kate; Ribo-Aristizabal, Jose Luis; Bar-Zeev, Naor; O'Brien, Katherine L.; Mulholland, Kim

    2017-01-01

    Childhood pneumonia is among the leading infectious causes of mortality in children younger than 5 years of age globally. Streptococcus pneumoniae (pneumococcus) is the leading infectious cause of childhood bacterial pneumonia. The diagnosis of childhood pneumonia remains a critical epidemiological task for monitoring vaccine and treatment program effectiveness. The chest radiograph remains the most readily available and common imaging modality to assess childhood pneumonia. In 1997, the World Health Organization Radiology Working Group was established to provide a consensus method for the standardized definition for the interpretation of pediatric frontal chest radiographs, for use in bacterial vaccine efficacy trials in children. The definition was not designed for use in individual patient clinical management because of its emphasis on specificity at the expense of sensitivity. These definitions and endpoint conclusions were published in 2001 and an analysis of observer variation for these conclusions using a reference library of chest radiographs was published in 2005. In response to the technical needs identified through subsequent meetings, the World Health Organization Chest Radiography in Epidemiological Studies (CRES) project was initiated and is designed to be a continuation of the World Health Organization Radiology Working Group. The aims of the World Health Organization CRES project are to clarify the definitions used in the World Health Organization defined standardized interpretation of pediatric chest radiographs in bacterial vaccine impact and pneumonia epidemiological studies, reinforce the focus on reproducible chest radiograph readings, provide training and support with World Health Organization defined standardized interpretation of chest radiographs and develop guidelines and tools for investigators and site staff to assist in obtaining high-quality chest radiographs. (orig.)

  6. Proposal to amend a partner project agreement with ISTC for the CMS collaboration

    CERN Document Server

    2000-01-01

    This document concerns an amendment to a partner project agreement with the ISTC, namely the Partner Project Agreement 1718p for "Technology Reliability Demonstration and Precise CMS Electromagnetic Calorimetry Performance at LHC on a Base of Specified Tungstate (PbWO4) Scintillation Crystals". This Partner Project was approved by Council on 17 December 1999 (cf. CERN/2312). For reasons set out in this document the Finance Committee is invited to authorise CERN to negotiate an amendment to the Partner Project Agreement 1718p. The purpose of the amendment is to increase the production rate of crystals through the acquisition, installation and commissioning of 33 additional crystal growth ovens for a total amount of 1 500 000 US dollars.

  7. Proposal for the extension of a partner project agreement with ISTC ? ATLAS collaboration

    CERN Document Server

    2000-01-01

    This document concerns the extension of the scope of work covered by a partner project agreement with the ISTC, namely Partner Project Agreement 1800p for Manufacturing, Assembly and Testing of the End-cap Transition Radiation Tracker (TRT) for the ATLAS Experiment at the CERN LHC. This Partner Project Agreement was approved by Council on 23 June 2000 (c.f. draft minutes of the meeting CERN/2340/Draft). For reasons set out in this document the Finance Committee is invited to approve the extension of the scope of work covered by Partner Project Agreement 1800p to include the Manufacturing, Assembly and Testing of type C End-cap support rings for a total amount of 503 720 Swiss francs.

  8. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  9. Proposing a Conceptual Framework to Utilize Storytelling Mechanism into Project Management Life Cycle

    Directory of Open Access Journals (Sweden)

    mahdi shami zanjani

    2013-10-01

    Full Text Available It is rather difficult to exploit knowledge in project organizations due to their unique characteristics and temporal behavior of activities. Therefore, development of knowledge management capability among projects is accounted for an important source to gain competitive advantage. This paper tries to provide a conceptual framework in order to introduce applications of storytelling as an effective and inexpensive mechanism for projects knowledge management. At first, a conceptual framework was designed including 58 story applications in activities of project life cycle by studying and analyzing the related literature. Then, validation of this conceptual framework was investigated and verified by relevant experts. Finally, application of storytelling was assessed within the projects of Sanam industrial and commercial company, using the framework designed. Analysis of data demonstrates that out of 58 applications introduced, this company benefit from just 28 applications. Research method in this section was survey. According to the available information, this paper is one of the first researches which have adopted to introduce applications of storytelling in the life cycle of project management by providing a conceptual framework.

  10. The National Educational Loan Bank: A Proposal for Improving the System of Lending for Higher Education. Working Paper, Preliminary Draft.

    Science.gov (United States)

    Deitch, Kenneth M.

    A National Education Loan Bank (NELB) is proposed as an alternative to existing federal loan programs for education, such as the National Direct Student Loan program and the Guaranteed Student Loan program. The history and structures of these two programs are detailed: financing, costs, insurance arrangements, agencies, volume, and interest rates.…

  11. Preliminary Conceptual Design Report for the FACET-II Project at SLAC National Accelerator Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, Mark [SLAC National Accelerator Lab., Menlo Park, CA (United States)

    2016-04-22

    Plasma wakefield acceleration has the potential to dramatically shrink the size and cost of particle accelerators. Research at the SLAC National Accelerator Laboratory has demonstrated that plasmas can provide 1,000 times the acceleration in a given distance compared with current technologies. Developing revolutionary and more efficient acceleration techniques that allow for an affordable high-energy collider is the focus of FACET, a National User Facility at SLAC. The existing FACET National User Facility uses part of SLAC’s two-mile-long linear accelerator to generate high-density beams of electrons and positrons. FACET-II is a new test facility to develop advanced acceleration and coherent radiation techniques with high-energy electron and positron beams. It is the only facility in the world with high energy positron beams. FACET-II provides a major upgrade over current FACET capabilities and the breadth of the potential research program makes it truly unique. It will synergistically pursue accelerator science that is vital to the future of both advanced acceleration techniques for High Energy Physics, ultra-high brightness beams for Basic Energy Science, and novel radiation sources for a wide variety of applications. The design parameters for FACET-II are set by the requirements of the plasma wakefield experimental program. To drive the plasma wakefield requires a high peak current, in excess of 10kA. To reach this peak current, the electron and positron design bunch size is 10μ by 10μ transversely with a bunch length of 10μ. This is more than 200 times better than what has been achieved at the existing FACET. The beam energy is 10 GeV, set by the Linac length available and the repetition rate is up to 30 Hz. The FACET-II project is scheduled to be constructed in three major stages. Components of the project discussed in detail include the following: electron injector, bunch compressors and linac, the positron system, the Sector 20 sailboat and W chicanes

  12. High Resolution Mineral Mapping of the Oman Drilling Project Cores with Imaging Spectroscopy: Preliminary Results

    Science.gov (United States)

    Greenberger, R. N.; Ehlmann, B. L.; Kelemen, P. B.; Manning, C. E.; Teagle, D. A. H.; Harris, M.; Michibayashi, K.; Takazawa, E.

    2017-12-01

    The Oman Drilling Project provides an unprecedented opportunity to study the formation and alteration of oceanic crust and peridotite. Key to answering the main questions of the project are a characterization of the primary and secondary minerals present within the drill core and their spatial relationships. To that end, we used the Caltech imaging spectrometer system to scan the entire 1.5-km archive half of the core from all four gabbro and listvenite boreholes (GT1A, GT2A, GT3A, and BT1B) at 250 µm/pixel aboard the JAMSTEC Drilling Vessel Chikyu during the ChikyuOman core description campaign. The instrument measures the visible and shortwave infrared reflectance spectra of the rocks as a function of wavelength from 0.4 to 2.6 µm. This wavelength range is sensitive to many mineral groups, including hydrated minerals (phyllosilicates, zeolites, amorphous silica polytypes), carbonates, sulfates, and transition metals, most commonly iron-bearing mineralogies. To complete the measurements, the core was illuminated with a halogen light source and moved below the spectrometer at 1 cm/s by the Chikyu's Geotek track. Data are corrected and processed to reflectance using measurements of dark current and a spectralon calibration panel. The data provide a unique view of the mineralogy at high spatial resolution. Analysis of the images for complete downhole trends is ongoing. Thus far, a variety of minerals have been identified within their petrologic contexts, including but not limited to magnesite, dolomite, calcite, quartz (through an Si-OH absorption due to minor H2O), serpentine, chlorite, epidote, zeolites, mica (fuchsite), kaolinite, prehnite, gypsum, amphibole, and iron oxides. Further analysis will likely identify more minerals. Results include rapidly distinguishing the cations present within carbonate minerals and identifying minerals of volumetrically-low abundance within the matrix and veins of core samples. This technique, for example, accurately identifies

  13. Preliminary Nearshore Sedimentation Rate Analysis of the Tuungane Project Northern Mahale Conservation Area, Lake Tanganyika (Tanzania)

    Science.gov (United States)

    Smiley, R. A.; McGlue, M. M.; Yeager, K. M.; Soreghan, M. J.; Lucas, J.; Kimirei, I.; Mbonde, A.; Limbu, P.; Apse, C.

    2017-12-01

    The combined effects of climate change, overfishing, and sediment pollution are altering Lake Tanganyika's littoral fisheries in profoundly negative ways. One method for conserving critical fish resources and safeguarding biodiversity in Lake Tanganyika is by establishing small-scale nearshore protected zones, which can be administrated by lakeshore villagers organized into beach management units (BMUs). Each BMU endeavors to manage offshore "no-catch" protected zones, prohibit the use of illegal fishing gear, and promote sustainable agriculture that abates erosion in the lake watershed, in order to mitigate sediment pollution in the lake. We adopted a limnogeological approach to assist in characterizing the littoral zone associated with BMUs in the northern Mahale region of Lake Tanganyika (Tanzania), a critical conservation area for the Nature Conservancy's Tuungane Project (https://www.nature.org/ourinitiatives/regions/africa/wherewework/tuungane-project.xml). We hypothesized that BMUs with heavy onshore agricultural activity would experience relatively high offshore sedimentation rates, due to enhanced sediment-laden runoff in the wet season. Such changes are predicted to alter benthic substrates and degrade habitat available for fish spawning. We mapped bathymetry and sediment types along a 29 km2 area of the littoral zone using high-resolution geophysical tools, and assessed short-term sedimentation rates using sediment cores and radionuclide geochronology (210Pb). Initial results from 210Pb analyses show that sedimentation rates at the mud-line ( 85-100 m water depth) are relatively slow but spatially variable in the northern Mahale area. Offshore of the Kalilani village BMU, linear sedimentation rates are 0.50 mm/yr. By contrast, sedimentation rates offshore from the Igualula village BMU are 0.90-1.30 mm/yr. Higher sedimentation rates near Igualula are consistent with greater sediment inputs from the nearby Lagosa River and its watershed, which has been

  14. Operational report, basics of the preliminary project for reconstruction of the RA reactor ventilation system

    International Nuclear Information System (INIS)

    Martinc, R.

    1982-01-01

    This report presents the summary of results needed for designing the reconstruction of the RA reactor ventilation system. The final complete report will published later, including results of possible additional analyses according to the needs of main detailed project. Due to the size of the facility the need of filters for particulates is expected in systems V-1 and V-2, as well as revision of the system V-4. Adsorption filters are not needed in case of operation under regular working conditions. It would be favorable, but not indispensable to construct an adsorption filter that could be used occasionally at the input of V-2 system under the upper water shielding. This filter would be switched on when dehermetization of the reactor is planned and increased radioactivity is indicated in the gas system or experimental space of the RA reactor as well as in case of fuel elements failure. The aim of applying filters is shortening the time these elements would spend in the hermetized reactor i.e. their fast removal from the reactor. It is indispensable to build-in 'emergency' highly efficient adsorption filters in the V-2 system which would be switched on in case of accidents that would cause fuel elements meltdown (with simultaneous accident dehermetization of the heavy water system) [sr

  15. S/sup 3/ Financial Projection Model: preliminary user's manual and system overview

    Energy Technology Data Exchange (ETDEWEB)

    Masso, J. F.

    1976-11-30

    The S/sup 3/ Financial Projection Model is an effort undertaken to construct a pipeline economic model in order to satisfy the requirements of the US ERDA program: Energy Study of Pipeline Transportation System. A brief outline of this process is described in Appendix A, Background on the S/sup 3/ Development of a Pipeline Economic Model. A general overview of the model is presented first to indicate the rationale underlying the model and to show the linkages between the various submodels. An understanding of the basic accounting definitions and self-evident relationships between line items in the general financial accounting reports is a prerequisite for the effective application of the model. Particular attention has been paid in this system description to defining the methods of calculations utilized by the model and to describing the optional capital investment planning techniques that may be exercised with the model. The mathematical relationships underlying various planning techniques are defined and the methods for applying these techniques are discussed with illustrations and sample input data specifications. Decision tables are used to show complex decision rules applied within the model to determine the logical flow of a particular computational routine. The complete set of source data and model options are described along with the procedures for input data preparation and actual program operation.

  16. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  17. Development of functional requirements for electronic health communication: preliminary results from the ELIN project.

    Science.gov (United States)

    Christensen, Tom; Grimsmo, Anders

    2005-01-01

    User participation is important for developing a functional requirements specification for electronic communication. General practitioners and practising specialists, however, often work in small practices without the resources to develop and present their requirements. It was necessary to find a method that could engage practising doctors in order to promote their needs related to electronic communication. Qualitative research methods were used, starting a process to develop and study documents and collect data from meetings in project groups. Triangulation was used, in that the participants were organised into a panel of experts, a user group, a supplier group and an editorial committee. The panel of experts created a list of functional requirements for electronic communication in health care, consisting of 197 requirements, in addition to 67 requirements selected from an existing Norwegian standard for electronic patient records (EPRs). Elimination of paper copies sent in parallel with electronic messages, optimal workflow, a common electronic 'envelope' with directory services for units and end-users, and defined requirements for content with the possibility of decision support were the most important requirements. The results indicate that we have found a method of developing functional requirements which provides valid results both for practising doctors and for suppliers of EPR systems.

  18. The Injection System of the INFN-SuperB Factory Project: Preliminary Design

    Energy Technology Data Exchange (ETDEWEB)

    Boni, Roberto; /INFN, Rome; Guiducci, Susanna; /INFN, Rome; Preger, Miro; /INFN, Rome; Raimondi, Pantaleo; /INFN, Rome; Chance, Antoine; /Saclay; Dadoun, Olivier; /Orsay, LAL; Poirier, Freddy; /Orsay, LAL; Variola, Alessandro; /Orsay, LAL; Seeman, John; /SLAC

    2012-07-05

    The ultra high luminosity B-factory (SuperB) project of INFN requires a high performance and reliable injection system, providing electrons at 4 GeV and positrons at 7 GeV, to fulfil the very tight requirements of the collider. Due to the short beam lifetime, continuous injection of electron and positron bunches in both LER and HER rings is necessary to maintain an high average luminosity. Polarized electrons are required for experiments and must be delivered by the injection system, due to the beam lifetime shorter than the ring polarization build-up: they will be produced by means of a SLAC-SLC polarized gun. The emittance and the energy spread of the e{sup -}/e{sup +} beams are reduced in a 1 GeV Damping Ring (DR) before injection in the main rings. Two schemes for positron production are under study, one with e{sup -}/e{sup +} conversion at low energy (< 1 Gev) and one with conversion at 6 GeV and a recirculation line to bring the positrons back to the DR. Acceleration through the Linac is provided by a 2856 MHz RF system made of travelling wave (TW), room temperature accelerating structures.

  19. Development of advanced instrumentation for the Phebus FP project-preliminary studies

    International Nuclear Information System (INIS)

    Hampel, G.; Poss, G.

    1989-10-01

    The objective of the project was to examine advanced measuring methods for on-line determination of aerosol, thermohydraulic and hydrogen parameters for their usefulness in the French core melting programme PHEBUS FP. Advanced methods that are known from reactor safety programmes as well as novel measuring techniques as used in related fields such as fuel reprocessing and in non-nuclear process technology have been described and analysed with a view to their potential application in the planned tests. Possibly necessary further developments and modifications have been identified and approaches to solution have been outlined. Special emphasis has been put on the present state of radiation resistant optical fibre wave-guides, which might be integrated in several instruments. As regards the particularly important on-line aerosol measurements in PHEBUS FP, a combined system is recommended as the most promising further development. This novel system configuration comprises the mass monitor of a MESA dust monitoring system and one or several photometers of EIR design

  20. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  1. General and preliminary thermohydraulic, hydrogen and aerosol instrumentation plan for the Phebus Fp-project

    International Nuclear Information System (INIS)

    Hampel, G.; Poss, G.; Frohlich, H.K.

    1989-10-01

    The objective of the project was to draw up an instrumentation plan for the French core melting programme PHEBUS FP. This instrumentation plan essentially was to include proven and reliable instruments for recording various thermohydraulic, aerosol and hydrogen phenomena. The candidate measuring methods, which are known mainly from reactor safety programmes, have been described and examined for their usefulness in PHEBUS. Each method and instrument has been described in detail under various aspects such as measuring principle, measuring range, technical design, evaluation model, calibration procedure, accuracy, previous experience, commercial availability, etc. Special attention has been paid to the behaviour of the measuring transducers when exposed to radiation. First, the performance of the instruments was compared with the requirements of PHEBUS. The results of this comparison served as the basis for a measuring concept in tabular form, giving the locations of the measurements, the measuring tasks, and the number and kind of instruments that are recommended. Redundancy and cost-benefit aspects have been taken into account in qualitative terms

  2. 75 FR 44053 - Proposed Collection; Comment Request: CDFI/CDE Project Profiles Web Form

    Science.gov (United States)

    2010-07-27

    ... provide loans, investments, financial services and technical assistance to underserved populations and... DEPARTMENT OF THE TREASURY Community Development Financial Institutions Fund Proposed Collection.... 3506(c)(2)(A). Currently, the Community Development Financial Institutions (CDFI) Fund, Department of...

  3. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  4. User Participation in Coproduction of Health Innovation: Proposal for a Synergy Project.

    Science.gov (United States)

    Nygren, Jens; Zukauskaite, Elena; Westberg, Niklas

    2018-05-09

    This project concerns advancing knowledge, methods, and logic for user participation in coproduction of health innovations. Such advancement is vital for several reasons. From a user perspective, participation in coproduction provides an opportunity to gain real influence over goal definition, design, and implementation of health innovations, ensuring that the solution developed solves real problems in right ways. From a societal perspective, it's a mean to improve the efficiency of health care and the implementation of the Patient Act. As for industry, frameworks and knowledge of coproduction offer tools to operate in a complex sector, with great potential for innovation of services and products. The fundamental objective of this project is to advance knowledge and methods of how user participation in the coproduction of health innovations can be applied in order to benefit users, industry, and public sector. This project is a synergy project, which means that the objective will be accomplished through collaboration and meta-analysis between three subprojects that address different user groups, apply different strategies to promote human health, and relate to different parts of the health sector. Furthermore, subprojects focus on distinctive stages in the spectrum of innovation, with the objective to generate knowledge of the innovation process as a whole. The project is organized around three work packages related to three challenges-coproduction, positioning, and realization. Each subproject is designed such that it has its own field of study with clearly identified objectives but also targets work packages to contribute to the project as a whole. The work on the work packages will use case methodology for data collection and analysis based on the subprojects as data sources. More concretely, logic of multiple case studies will be applied with each subproject representing a separate case which is similar to each other in its attention to user participation in

  5. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  6. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  7. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  8. Preliminary Assessment of JERS-1 SAR to Discriminating Boreal Landscape Features for the Boreal Forest Mapping Project

    Science.gov (United States)

    McDonald, Kyle; Williams, Cynthia; Podest, Erika; Chapman, Bruce

    1999-01-01

    This paper presents an overview of the JERS-1 North American Boreal Forest Mapping Project and a preliminary assessment of JERS-1 SAR imagery for application to discriminating features applicable to boreal landscape processes. The present focus of the JERS-1 North American Boreal Forest Mapping Project is the production of continental scale wintertime and summertime SAR mosaics of the North American boreal forest for distribution to the science community. As part of this effort, JERS-1 imagery has been collected over much of Alaska and Canada during the 1997-98 winter and 1998 summer seasons. To complete the mosaics, these data will be augmented with data collected during previous years. These data will be made available to the scientific community via CD ROM containing these and similar data sets compiled from companion studies of Asia and Europe. Regional landscape classification with SAR is important for the baseline information it will provide about distribution of woodlands, positions of treeline, current forest biomass, distribution of wetlands, and extent of major rivercourses. As well as setting the stage for longer term change detection, comparisons across several years provides additional baseline information about short-term landscape change. Rapid changes, including those driven by fire, permafrost heat balance, flooding, and insect outbreaks can dominate boreal systems. We examine JERS-1 imagery covering selected sites in Alaska and Canada to assess quality and applicability to such relevant ecological and hydrological issues. The data are generally of high quality and illustrate many potential applications. A texture-based classification scheme is applied to selected regions to assess the applicability of these data for distinguishing distribution of such landcover types as wetland, tundra, woodland and forested landscapes.

  9. Does Library Use Affect Student Attainment? A Preliminary Report on the Library Impact Data Project

    Directory of Open Access Journals (Sweden)

    Graham Stone

    2011-10-01

    . This paper will report on the initial findings of the project and whether the measurable targets have been achieved: Sufficient data are successfully captured from all partners; Statistical significance is proved for all data; The hypothesis is either wholly or partly proved for each data type and partner.

  10. Preliminary analysis of downhole logging data from ICDP Lake Junin drilling Project, Peru

    Science.gov (United States)

    Pierdominici, Simona; Kück, Jochem; Rodbell, Donald T.; Abbott, Mark B.

    2016-04-01

    The International Continental Drilling Programm (ICDP) has supported a scientific drilling campaign in Peru during the summer season 2015. The Lake Junin Drilling Project mainly aims at obtaining high-resolution paleoclimate records from lacustrine sediments to reconstruct the history of the continental records covering the glacial-interglacial cycles. Lake Junín is located at 4000 m a.s.l. in the tropical Andes of Peru, and is characterized by a thick (> 125 m) sediment package deposited at a high rate (0.2 to 1.0 mm yr-1). Lake Junín is one of the few lakes in the tropical Andes that predates the maximum extent of glaciation and is in a geomorphic position to record the waxing and waning of glaciers in nearby cordillera, hence making the lake a key site for the investigation of the Quaternary climate evolution in the inner-tropics of the Southern Hemisphere. Continous coring was performed at three sites in overall 11 boreholes on the lake with at least two overlapping boreholes per site to avoid core gaps. The depth of the boreholes varied between approx. 30 m and 110 m depending on the drill site. The core bit had a bit size of 122.6 mm and yielded a core diameter of 85 mm. Upon completion of coring operations downhole geophysical logging was performed in five of the 11 boreholes (1A, 1C, 1D, 2A and 3B) by the Operational Support Group of ICDP. The main objective was to record in-situ the physical properties of the lacustrine sediments of Lake Junin. Downhole logs provide a powerful tool to fill in information at intervals with core gaps and as depth reference for depth matching of the discontinous cores. Furthermore it will be used for the lithological reconstruction and interpretation. The OSG downhole logging comprised total and spectrum gamma ray, magnetic susceptibility, borehole geometry, temperature, and sonic P-wave velocity. Unstable and collapsing borehole walls made it neccessary to carry out logging in several sections instead of in one run. The

  11. WHISPERS Project on the easternmost slope of the Ross Sea (Antarctica): preliminary results.

    Science.gov (United States)

    Olivo, E.; De Santis, L.; Bergamasco, A.; Colleoni, F.; Gales, J. A.; Florindo-Lopez, C.; Kim, S.; Kovacevic, V.; Rebesco, M.

    2017-12-01

    The advance and retreat of the West Antarctic Ice Sheet from the outer continental shelf and the oceanic circulation are the main causes of the depositional processes on the Ross Sea continental slope, at present time and during the most of the Cenozoic. Currently the Antarctic Bottom Water formation is directly linked to the relatively warm Circumpolar Deep Water that, encroaching the continental shelf, mixes with the colder Ross Sea Bottom Water. Detailed multibeam and geological surveys useful to locate and characterize peculiar morphological structures on the bottom are essential to study how the glacial and oceanographic processes interact with the seabed sediments. In the framework of the PNRA-WHISPERS project (XXXIIth Italian Antarctic expedition - January/March 2017), new multibeam bathymetric, sub-bottom chirp, were acquired from the easternmost margin of the Ross Sea, on the southeastern side of the Hayes Bank, usually covered by sea ice. We observed on the upper slope erosional features (incised gullies of likely glacial meltwater origin). A broad scar in the upper slope is characterized by an elongated SSW-NNE ridge (10 km long, 850-1200 m water depth, 2 km wide), that may be a remnants of previous glacial or debris flow deposits, eroded by meltwater outwash discharge at the beginning of grounding ice retreat and by RSBW cascading along the slope, as documented by Expandable Bathy-Thermograph and Acoustic Depth Current Profile data. Sub-bottom chirp profiles crossing this ridge show a very low amplitude reflective sea bed, supporting the hypothesis of its soft sediment nature, in good agreement with a very low acoustic velocity obtained by multichannel seismic data reprocessing. The occurrence of internal stratification on 2D multichannel seismic profiles would discount a gas-fluids related mud volcano origin. No sediment cores were collected, due to bad sea conditions and limited ship time, further data collection would be needed to fully understand

  12. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  13. 77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-08-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  14. 77 FR 34122 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-06-08

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  15. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Science.gov (United States)

    2012-03-09

    ... existing roadway and bridges and reconfigure the study-area freeway system to address safety issues and design deficiencies and provide additional capacity. The project termini are 124th Street on the west... Water Conservation Act as amended [16 U.S.C. 4601], Farmland Protection Policy Act of 1980 [7 U.S.C...

  16. Systematic Approach to Formulate PSS Development Project Proposals in the Fuzzy Front End

    DEFF Research Database (Denmark)

    Barquet, Ana Paula B.; Pigosso, Daniela Cristina Antelmi; Rozenfeld, Henrique

    2013-01-01

    be considered by companies during this definition. The systematization of PSS attributes may help increase the knowledge about different PSS projects that can emerge in the front end, thus leading to the discovery of opportunities that are not apparent in the existing business models and give rise to new ideas...

  17. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    Science.gov (United States)

    2013-05-06

    ... selected and implemented in accordance with the Oil Pollution Act of 1990 (OPA), the Framework Agreement... oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701 et seq.). Pursuant to OPA, federal and... cost of this project is approximately $3.5 million. Sea Rim State Park Amenities (Jefferson County...

  18. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  19. 78 FR 46858 - Proposed Waiver and Extension of the Project Period for the Individuals With Disabilities...

    Science.gov (United States)

    2013-08-02

    ... affiliates need continued support to engage in meaningful dialogue, continual learning, and problem solving... dissemination strategies. The Partnership Project has developed and enhanced tools and strategies to improve the... disabilities within general education reform efforts. Engagement tools and strategies include: (1) Various...

  20. Research Proposal: Methodology for Assessment Frameworks in Large-scale Infrastructural Water Projects

    NARCIS (Netherlands)

    Hommes, Saskia

    2005-01-01

    Water management is a central and ongoing issue in the Netherlands. Large infrastructural projects are being carried out and planned in a number of water systems. These initiatives operate within a complex web of interactions, between short- and long-term, economic costs and benefits, technical

  1. Preliminary siting criteria for the proposed mixed and low-level waste treatment facility at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Jorgenson-Waters, M.

    1992-09-01

    The Mixed and Low-Level Waste Treatment Facility project was established in 1991 by the US Department of Energy Idaho Field Office. This facility will provide treatment capabilities for Idaho National Engineering Laboratory (INEL) low-level mixed waste and low-level waste. This report identifies the siting requirements imposed on facilities that treat and store these waste types by Federal and State regulatory agencies and the US Department of Energy. Site selection criteria based on cost, environmental, health and safety, archeological, geological and service, and support requirements are presented. These criteria will be used to recommend alternative sites for the new facility. The National Environmental Policy Act process will then be invoked to evaluate the alternatives and the alternative sites and make a final site determination

  2. Evaluating Proposed Investments in Power System Reliability and Resilience: Preliminary Results from Interviews with Public Utility Commission Staff

    Energy Technology Data Exchange (ETDEWEB)

    LaCommare, Kristina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Eto, Joseph [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-01-01

    Policymakers and regulatory agencies are expressing renewed interest in the reliability and resilience of the U.S. electric power system in large part due to growing recognition of the challenges posed by climate change, extreme weather events, and other emerging threats. Unfortunately, there has been little or no consolidated information in the public domain describing how public utility/service commission (PUC) staff evaluate the economics of proposed investments in the resilience of the power system. Having more consolidated information would give policymakers a better understanding of how different state regulatory entities across the U.S. make economic decisions pertaining to reliability/resiliency. To help address this, Lawrence Berkeley National Laboratory (LBNL) was tasked by the U.S. Department of Energy Office of Energy Policy and Systems Analysis (EPSA) to conduct an initial set of interviews with PUC staff to learn more about how proposed utility investments in reliability/resilience are being evaluated from an economics perspective. LBNL conducted structured interviews in late May-early June 2016 with staff from the following PUCs: Washington D.C. (DCPSC), Florida (FPSC), and California (CPUC).

  3. Preliminary Assessment of the Nuclide Migration from the Activation Zone Around the Proposed Spallation Neutron Source Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dole, L.R.

    1998-09-01

    The purpose of this study is to investigate the potential impacts of migrating radionuclides from the activation zone around the proposed Spallation Neutron Source (SNS). Using conservatively high estimates of the potential inventory of radioactive activation products that could form in the proposed compacted-soil shield berm around an SNS facility on the Oak Ridge Reservation (ORR), a conservative, simplified transport model was used to estimate the potential worst-case concentrations of the 12 long-lived isotopes in the groundwater under a site with the hydrologic characteristics of the ORR. Of the 12, only 3 isotopes showed any potential to exceed the U.S. Nuclear Regulatory Commission (NRC) 10 Code of Federal Regulations (CFR) Part 20 Drinking Water Limits (DWLs). These isotopes were 14C, 22Na, and 54Mn. The latter two activation products have very short half-lives of 2.6 years and 0.854 year, respectively. Therefore, these will decay before reaching an off-site receptor, and they cannot pose off-site hazards. However, for this extremely conservative model, which overestimates the mobility of the contaminant, 14C, which has a 5,730-year half-life, was shown to represent a potential concern in the context of this study's conservative assumptions. This study examines alternative modifications to the SNS shield berm and makes recommendations.

  4. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-07

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  5. Preliminary assessment of the aquatic impacts of a proposed defense waste processing facility at the Savannah River Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mackey, H.E. Jr.

    1979-01-01

    A review of the literature indicates that a significant body of descriptive information exists concerning the aquatic ecology of Upper Three Runs Creek and Four Mile Creek of the Savannah River Plant south of Aiken, South Carolina. This information is adequate for preparation of an environmental document evaluating these streams. These streams will be impacted by construction and operation of a proposed Defense Waste Processing Facility for solidification of high level defense waste. Potential impacts include (1) construction runoff, erosion, and siltation, (2) effluents from a chemical and industrial waste treatment facility, and (3) radionuclide releases. In order to better evaluate potential impacts, recommend mitigation methods, and comply with NEPA requirements, additional quantitative biological information should be obtained through implementation of an aquatic baseline program.

  6. Preliminary assessment of the aquatic impacts of a proposed defense waste processing facility at the Savannah River Plant

    International Nuclear Information System (INIS)

    Mackey, H.E. Jr.

    1979-01-01

    A review of the literature indicates that a significant body of descriptive information exists concerning the aquatic ecology of Upper Three Runs Creek and Four Mile Creek of the Savannah River Plant south of Aiken, South Carolina. This information is adequate for preparation of an environmental document evaluating these streams. These streams will be impacted by construction and operation of a proposed Defense Waste Processing Facility for solidification of high level defense waste. Potential impacts include (1) construction runoff, erosion, and siltation, (2) effluents from a chemical and industrial waste treatment facility, and (3) radionuclide releases. In order to better evaluate potential impacts, recommend mitigation methods, and comply with NEPA requirements, additional quantitative biological information should be obtained through implementation of an aquatic baseline program

  7. THE YOUTH PERSPECTIVE MANAGER FUTURE CHALLENGES AHEAD TO PROPOSED BY ORGANIZATIONAL STUDIES: A PRELIMINARY DIAGNOSIS AND ITS FUTURE PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Wesley Antonio Gonçalves

    2015-09-01

    Full Text Available The study aimed to diagnose as young students of management define and realize the factors related to man and the fear of freedom to develop their future assignments subjective as future managers and their subsequent execution. To achieve the proposal, we employed the qualitative research method using script focused in order to observe the ontology interview. Respondents showed be used in your academic life conceptual inclinations towards various definitions found in the literature which litigiou the assumptions of the authors in relation to human and professional activities they will face as future managers, even taking into account the different decades (time. Keywords: Perspectives of human beings. The fear of freedom. Student management. People management. Organizational Studies.

  8. Orthorexia nervosa: a preliminary study with a proposal for diagnosis and an attempt to measure the dimension of the phenomenon.

    Science.gov (United States)

    Donini, L M; Marsili, D; Graziani, M P; Imbriale, M; Cannella, C

    2004-06-01

    To propose a diagnostic proceeding and to try to verify the prevalence of orthorexia nervosa (ON), an eating disorder defined as "a maniacal obsession for healthy foods". 404 subjects were enrolled. Diagnosis of ON was based on both the presence of a disorder with obsessive-compulsive personality features and an exaggerated healthy eating behaviour pattern. Of the 404 subjects examined, 28 were found to suffer from ON (prevalence of 6.9%). The analysis of the physiological characteristics, the social-cultural and the psychological behaviour that characterises subjects suffering from ON shows a higher prevalence in men and in those with a lower level of education. The orthorexic subjects attribute characteristics that show their specific "feelings" towards food ("dangerous" to describe a conserved product, "artificial" for industrially produced products, "healthy" for biological produce) and demonstrate a strong or uncontrollable desire to eat when feeling nervous, excited, happy or guilty.

  9. High Temperature Reactors for a proposed IAEA Coordinated Research Project on Energy Neutral Mineral Development Processes

    International Nuclear Information System (INIS)

    Haneklaus, Nils; Reitsma, Frederik; Tulsidas, Harikrishnan

    2014-01-01

    The International Atomic Energy Agency (IAEA) is promoting a new Coordinated Research Project (CRP) to elaborate on the applicability and potential of using High Temperature Reactors (HTRs) to provide process heat and/or electricity to power energy intensive mineral development processes. The CRP aims to provide a platform for cooperation between HTR-developers and mineral development processing experts. Energy intensive mineral development processes with (e.g. phosphate-, gold-, copper-, rare earth ores) or without (e.g. titanium-, aluminum ore) the possibility to recover accompanying uranium and/or thorium that could be developed and used to run the HTR for “energy neutral” processing of the primary ore shall be discussed according to the participants needs. This paper specifically focuses on the aspects that need to be addressed by HTR-designers and developers. First requirements that should be fulfilled by the HTR-designs are highlighted together with the desired outcomes of the research project. (author)

  10. The Educational Project as a pivotal framework for pedagogical practice: reflections and proposals for action

    Directory of Open Access Journals (Sweden)

    Javier ARGOS GONZÁLEZ

    2011-09-01

    Full Text Available The basic features of an educational task are sufficiently complex to demand their «construction» from theoretical-pedagogical frameworks that are consistent, rigorous and ethically founded. To achieve this end, the coherence and meaning of such a task become transformed into indispensable elements which need to be projected, both into the school and into the classroom, which, in the last resort, is where the important pedagogical formulae that have been adopted on consensus are given shape. Taking these considerations into account, we analyse in the present research the importance of the educational School Project, as a text which upholds the pedagogical task, before going on to formulate a series of postulates which should be upheld in our professional practice. Thus elements such as the pedagogy of listening, unhurried learning, and intuition, creativity, curiosity and pleasure in learning emerge and are visible in the pedagogical scene.

  11. Projeto larga escala: uma proposta pedagógica atual Larga escala project: an actual pedagogic proposal

    Directory of Open Access Journals (Sweden)

    Anna Luiza de F. P. Lins Gryschek

    2000-06-01

    Full Text Available Discorre-se sobre um projeto de formação dos atendentes de enfermagem, o conhecido "Projeto Larga Escala", seu histórico, a legislação que o ampara e a sua trajetória na Secretaria Municipal da Saúde do Município de São Paulo. Conclui-se que o "Projeto Larga Escala" é uma proposta pedagógica válida, devendo ser incentivada e ampliada em âmbito nacional.This study discourses about a nursing project, the well known "Larga Escala Project", its history, the legislation that gives support to it and its trajectory in the Health Secretary of the Township of São Paulo. The conclusion is that the "Larga Escala Project" is a valid pedagogic proposal and it must be encouraged and amplified to all the national field.

  12. 76 FR 14099 - Proposed Collection of Information for an Evaluation of the Young Parents Demonstration Project...

    Science.gov (United States)

    2011-03-15

    ... desired format, reporting burden (time and financial resources) is minimized, collection instruments are... DEPARTMENT OF LABOR Employment and Training Administration Proposed Collection of Information for.../or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA...

  13. 75 FR 76479 - Notice of Proposed Information Collection for Public Comment: County Data Record Project

    Science.gov (United States)

    2010-12-08

    ... forms of information technology; e.g., permitting electronic submission of responses. Title of Proposal... Associates Inc. and its subcontractors, Fairview Industries and Smart Data Strategies, is conducting a... activities. First, this database will give HUD an ability to track home sales, foreclosures and tax...

  14. 76 FR 43657 - Proposed Information Collection; Comment Request; Project 25 Compliance Assessment Program...

    Science.gov (United States)

    2011-07-21

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology Proposed Information... via the Internet at [email protected] ). SUPPLEMENTARY INFORMATION: I. Abstract The September 11... collection techniques or other forms of information technology. Comments submitted in response to this notice...

  15. Proposal for the Extension of a Project Agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2002-01-01

    This document concerns the extension of the scope of work covered by a project agreement with the ISTC, entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medicine and Pharmacology" which was approved by Finance Committee on 19 September 2001 (CERN/FC/4478). For the reasons set out in this document, the Finance Committee is invited to approve the extension of the scope of work covered by the above project agreement for the optimisation of the technology for a total amount of 160 000 US dollars. This extension will be partially funded by two external sponsors (RAYTEST - DE and the UNIVERSITY OF LAUSANNE - CH) at the level of 90 000 US dollars. CERN's contribution, which will be funded by revenue generated by its technology transfer activities, will not exceed 70 000 US dollars. This extension will bring the total amount of the Project Agreement to 935 000 US dollars, of which CERN's total contribution will not exceed 320 000 US dollars...

  16. Preliminary investigations of the copper/bismuth/tin system in a proposed new net-shaping process

    International Nuclear Information System (INIS)

    Macnamara, D.S.; Meltcalfe, R.D.; Krezalek, I.

    2002-01-01

    Full text: Mixed-phase near net-shape forming processes such as semi-solid and thixotropic moulding are receiving increasing interest. Problems met in these processes include homogenisation of the semi-solid melt and temperature control in the semi-solid region. Injection moulding of a paste of solid particles of relatively high melting point in a liquid metal matrix removes the need for precision temperature control. Ideally the process should also require neither mechanical stirring nor agitation. In this project, powder precursors are subjected to uniaxial compaction to improve particle distribution and provide good metal-to-metal contact. Static heating tests to determine the composition of the mixed-phase melt and dynamic tests to investigate the homogeneity, density and net shape of extruded samples have been carried out. Initial investigations have concentrated on copper particles suspended in a near-eutectic bismuth-tin alloy. This provides a good density match between liquid and solid phases, a low temperature melt, and good optical contrast for traditional metallography. We used the scanning electron microscope to highlight fine detail of microstructural features, and electron probe microanalysis for compositional information on the resultant material. Detailed results are presented. Copyright (2002) Australian Society for Electron Microscopy Inc

  17. Potential cost to Western Australia of proposed patient co-payments according to healthcare organisational structure: A preliminary analysis.

    Science.gov (United States)

    Millar, J Alasdair; Millar, Robyn C

    2014-01-01

    The Australian federal government has proposed an AUD $7 patient co-payment for a general practitioner (GP) consultation. One effect of the co-payment may be that patients will seek assistance at public hospital emergency departments (EDs), where currently there is no user charge. We studied the possible financial impact of patient diversion on the Western Australia (WA) health budget. We constructed a spreadsheet model of changes in annual cash flows including the co-payment, GP fees for service, and rates of diversion to emergency departments with additional marginal costs for ED attendance. Changes in WA cash flows are the aggregate of marginal ED costs of treating diverted patients and added expenditure in fees paid to rural doctors who also man local emergency centres. The estimated costs to WA are AUD $6.3 million, $35.9 million and $87.4 million at 1, 5, and 10 per cent diversion, respectively. Commonwealth receipts increase and expenditure on Medicare benefits declines. A diversion of patients from GP surgeries to ED in WA caused by the co-payment will result in increased costs to the state, which may be substantial, and will reduce net costs to the Commonwealth.

  18. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ... Announcing Preliminary Permit Drawing . The Commission has received three preliminary permit applications... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\3\\ The priority established by this drawing will be used to determine...

  19. Proposed methodology for completion of scenario analysis for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Plum, R.J.; Visca, P.J.

    1984-11-01

    This report presents the methodology to complete an assessment of postclosure performance, considering all credible scenarios, including the nominal case, for a proposed repository for high-level nuclear waste at the Hanford Site, Washington State. The methodology consists of defensible techniques for identifying and screening scenarios, and for then assessing the risks associated with each. The results of the scenario analysis are used to comprehensively determine system performance and/or risk for evaluation of compliance with postclosure performance criteria (10 CFR 60 and 40 CFR 191). In addition to describing the proposed methodology, this report reviews available methodologies for scenario analysis, discusses pertinent performance assessment and uncertainty concepts, advises how to implement the methodology (including the organizational requirements and a description of tasks) and recommends how to use the methodology in guiding future site characterization, analysis, and engineered subsystem design work. 36 refs., 24 figs., 1 tab

  20. GENIUS-TF - a test facility for the GENIUS project. Proposal

    International Nuclear Information System (INIS)

    Klapdor-Kleingrothaus, H.V.; Dietz, A.; Heusser, G.

    2001-02-01

    GENIUS is a proposal for a large scale detector of rare events. As a first step of the experiment, a small test version, the Genius Test-Facility is proposed to be built up at the Laboratori Nazionali del Gran Sasso (LNGS). With about 40 kg of natural Ge detectors operated in liquid nitrogen, Genius-TF could exclude (or directly confirm) the DAMA annual modulation signature within about two years of measurement using both, signal and signature of the claimed WIMP Dark matter. The funding of the experiment has already been approved and four 2.5 kg germanium detectors with an extreme low treshold of 500 eV have been produced. The installation can be started immediately. No additional space in the Underground Laboratory is required. (orig.)

  1. Florar Project: a forest proposal to PETROBRAS-TRANSPETRO; Projeto Florar: uma proposta florestal para a PETROBRAS-TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Melo Neto, Joao Evangelista de; Martini, Andrea Dietrich; Ozorio, Tarcisio Faria; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work presents for discussion a proposal of a forest project idealized to be implemented, in form of a linear forest, in the long of TRANSPETRO pipeway, from north to south of the country. The initial goals, restricted to the State of Sao Paulo, presume the forest fomentation of 1,000 kilometers of path, covering an area of approximately 10,000 hectares, where can be possible to realize native and exotic species plantation, considering the legal restrictions. The proposal presumes also a fund to the special nature reserve creation in the cities crossed by TRANSPETRO pipeways. The pilot proposed in this work could take place at 'Plano Diretor de Dutos de Sao Paulo', which involves 27 cities, incorporating the environmental recuperation programs from native vegetation suppression and intervention in permanent preservation area in terms of forest law. (author)

  2. Summary record of the experts meeting on the proposed OECD-IRSN STLOC project

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this meeting was to determine the interest in member countries for the types of LOCA tests envisaged in the STLOC programme proposed by IRSN. The IRSN proposal was circulated among this Group in advance of the meeting. After the presentations and discussions, the Group recommendations were as follows: different views were expressed as to the need to perform the LOCA integral tests; there was an understanding that the results of separate effect tests (ANL, JAERI, Halden) would need to be obtained before deciding on the intended LOCA tests proposed in STLOC; IRSN and the OECD-NEA should explore the possibility to run the first ST test with air ingress (STLOC1), for which partial funding already exists (this test is foreseen for 2008); the need of LOCA tests as envisaged in STLOC should be re-assessed in about three years time (2006); analytical and experimental progress on LOCA tests should be monitored until then, through for instance the SEGFSM. An executive summary of the IRSN Source term LOCA program LOCA part is given in an appendix

  3. Environmental Assessment. Proposed Air Force Space Division Housing Project, White Point, Los Angeles, California

    Science.gov (United States)

    1984-07-01

    render any potential impactsnegligible. 5 E. Diking, Dredging and Shoreline Structures The project would have no effect on these areas of concern; see3...San Juan Capistrano Indians of Southern California [1812-1826]") and Hugo Reid’s letters I printed in the Los Angeles Star in the 1800’s ( Heizer 1968...California5 n.d. A Brief History of Fort MacArthur. Heizer , R. F. (ed.) 1968 The Indians of Los Angeles County: Hugo Reid’s Letters of 1852

  4. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  5. Are REDD+ community forest projects following the principles for collective action, as proposed by Ostrom?

    Directory of Open Access Journals (Sweden)

    Abdul-Razak Saeed

    2017-03-01

    Full Text Available Forested countries in the global south that have agreed to engage in REDD+, a policy mechanism for addressing climate change, are receiving support to improve laws, policies, systems and structures. As a mechanism initiated at the global level and seeking to use forests to address a global commons crisis (atmospheric carbon concentration, understanding how REDD+ translates into implementation at the local level is essential. Therefore, using a systematic review approach, we examined 15 studies of REDD+ in the context of public and/or community managed forests, drawn from a comprehensive application of inclusion criteria to identify relevant published peer-reviewed empirical research. The common property resources literature was used to highlight the role of local institutions in REDD+ and to distil how REDD+ community forest projects conform to Ostrom’s collective action principles. The review revealed limited sharing of information and decision-making authority with communities; a general absence of FPIC; and a lack of defined benefit sharing and conflict resolution arrangements in many of the REDD+ projects.

  6. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the "Thought in Mind" Project.

    Science.gov (United States)

    Valle, Annalisa; Massaro, Davide; Castelli, Ilaria; Sangiuliano Intra, Francesca; Lombardi, Elisabetta; Bracaglia, Edoardo; Marchetti, Antonella

    2016-01-01

    Mentalization research focuses on different aspects of this topic, highlighting individual differences in mentalizing and proposing programs of intervention for children and adults to increase this ability. The "Thought in Mind Project" (TiM Project) provides training targeted to adults-teachers or parents-to increase their mentalization and, consequently, to obtain mentalization improvement in children. The present research aimed to explore for the first time ever the potential of training for teachers based on the TiM Project, regarding the enhancement of mentalizing of an adult who would have interacted as a teacher with children. For this reason, two teachers - similar for meta-cognitive and meta-emotional skills - and their classes (N = 46) were randomly assigned to the training or control condition. In the first case, the teacher participated in training on the implementation of promotion of mentalizing in everyday school teaching strategies; in the second case the teacher participated in a control activity, similar to training for scheduling and methods, but without promoting the implementation of mentalization (in both conditions two meetings lasting about 3 h at the beginning of the school year and two supervisions during the school year were conducted). The children were tested by tasks assessing several aspects of mentalization (second and third-order false belief understanding, Strange Stories, Reading the mind in the Eyes, Mentalizing Task) both before and after the teacher participate in the TiM or control training (i.e., at the beginning and at the end of the school year). The results showed that, although some measured components of mentalization progressed over time, only the TiM Project training group significantly improved in third order false belief understanding and changed - in a greater way compared to the control group - in two of the three components of the Mentalizing Task. These evidences are promising about the idea that the creation of

  7. Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

    Energy Technology Data Exchange (ETDEWEB)

    Hadgu, Teklu [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis; Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Nuclear Waste Disposal Research and Analysis

    2016-09-01

    Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

  8. Airborne pollutant concentrations and health risks in selected Apulia region (IT) areas: preliminary results from the Jonico-Salentino project

    Science.gov (United States)

    Buccolieri, Riccardo; Genga, Alessandra; De Donno, Antonella; Siciliano, Tiziana; Siciliano, Maria; Serio, Francesca; Grassi, Tiziana; Rispoli, Gennaro; Cavaiola, Mattia; Lionello, Piero

    2017-04-01

    The Jonico-Salentino project (PJS) is a multidisciplinary study funded by Apulia Region (Det. N. 188_RU - 10/11/2015) aiming to assess health risk of people living in the cities of Lecce, Brindisi and Taranto. Citizens are exposed to emissions from industrial sources, biomass burning, vehicular, naval and air traffic, as well as from natural radioactive sources (radon). In this context, this work presents some preliminary results obtained by the Unit of University of Salento (Lecce) during an experimental campaign carried out in the study areas. The campaign is devoted to (i) sample particulate matter (PM), (ii) measure micro-meteorological variables and (iii) evaluate exposure levels of residents to main pollutants. Specifically, PM is sampled using a low volume sampler, while meteorological variables (wind speed components and direction temperature, relative humidity, precipitation and global solar radiation) are measured by advanced instrumentation such as ultrasonic anemometers which allows for the estimation of turbulence fluxes. The early effects of exposure to air pollutants is evaluated by the frequency of micronucleus (a biomarker of DNA damage) in exfoliated buccal cells collected using a soft-bristled toothbrush from oral mucosa of primary school children enrolled in the study. PM concentration data collected during the campaign are characterised from a chemical and morphological point of view; the analysis of different groups of particles allows identifying different natural and anthropogenic emission sources. This is done in conjunction to the investigation of the influence of local meteorology to elucidate the contribution of specific types of sources on final concentration levels. Finally, all data are used to assess the health risk of people living in the study areas as consequence of exposure to airborne pollutants.

  9. Listvenite formation from peridotite: Insights from Oman Drilling Project hole BT1B and preliminary reaction path model approach.

    Science.gov (United States)

    de Obeso, J. C.; Kelemen, P. B.; Manning, C. E.; Michibayashi, K.; Harris, M.

    2017-12-01

    Oman Drilling Project hole BT1B drilled 300 meters through the basal thrust of the Samail ophiolite. The first 200 meters of this hole are dominated by listvenites (completely carbonated peridotites) and serpentinites. Below 200 meters the hole is mainly composed of metasediments and metavolcanics. This core provides a unique record of interaction between (a) mantle peridotite in the leading edge of the mantle wedge and (b) hydrous, CO2 rich fluids derived from subducting lithologies similar to those in the metamorphic sole. We used EQ3/6 to simulate a reaction path in which hydrous fluid in equilibrium with qtz + calcite + feldspar + chlorite or smectite reacts with initially fresh peridotite at 100°C (the estimated temperature of alteration, Falk & Kelemen GCA 2015) and 5 kb. Water was first equilibrated with minerals observed during core description in the metamorphic sole at 100°C and 5kb. This fluid is then reacted with olivine enstatite and diopside (Mg#90) approximating the average composition of residual mantle peridotite (harzburgite) in Oman. Secondary minerals resulting from complete reaction are then reacted again with the initial fluid in an iterative process, up to water/rock > 1000. Water/rock close to 1 results in complete serpentinization of the peridotite, with chrysotile, brucite and magnetite as the only minerals. Water/rock >10 produces carbonates, chlorite and talc. Further increasing water/rock to > 100 produces assemblages dominated by carbonates and quartz with minor muscovite, similar to listvenites of hole BT1B that contain qtz + carbonates + Fe-oxyhydroxides + relict spinel ± chromian muscovite and fuchsite. The results of this preliminary model are consistent with the complex veining history of core from BT1B, with carbonate/iron oxide veins in both listvenites and serpentinites interpreted to be the earliest record of peridotite carbonation after initial serpentinization.

  10. Economic Functions Proposal of Urgency Prioritization of Investment Projects of Operated Railway Bridges

    Directory of Open Access Journals (Sweden)

    Pitoňák Martin

    2014-12-01

    Full Text Available The main objective of the article is to describe the proposals of economic functions within the prioritization of urgency investments of operated railway bridges within a comprehensive evaluation of existing bridges. The purpose of the paper is a comprehensive assessment of existing bridges and to define determinants and determinants of decision-making and designing a mechanism of decision-making procedures of prioritized infrastructure measures in the form of repairs and reconstructions of bridges resulting from the records of supervising activities based not only on technical but also economic aspects to the railway infrastructure manager.

  11. Assessment of heavy metal concentration in water around the proposed Mkuju river uranium project in Tanzania

    International Nuclear Information System (INIS)

    Banzi, F.P.; Msaki, P.K.; Mohammed, N.K.

    2015-01-01

    Effective verification for compliance with water quality standards in uranium mining in Tanzania requires data sensitive to monitor heavy metal concentration in water around the Mkuju River Uranium Project before mining commences. The area susceptible for pollution by the project was estimated using AERMOD dispersion model and found to cover about 1300 km"2. Thirty one surface and groundwater samples were collected and analysed for heavy metals and physicochemical properties using ICP-MS and standards techniques, respectively. The physicochemical properties for water samples analysed ranges from 5.7 to 7.8 for pH, 2.8 to 80.2 mg/L for TDS and 15 to 534.5 mS/cm for EC. These values show that the water in the vicinity of the Mkuju River Uranium Project is normal. The ranges of concentration of heavy metals (µgL"-"1) determined in water ranges were: Al(2 to 9049), Cr(0.2 to 19.96), Mn (0.1 to 1452), Fe(2 to 53890), Co(0.02 to 27.63), Ni(0.2 to 9.7), Cu(2 to 17), Zn(2 to 62.94), As(0.4 to 19.17), Cd(0.02 to 0.14), Pb (0.02 to 78.68), Th (0.002 to 1.73), U(0.002 to 29.76). These values are below the tolerance levels of concentrations set by different International organisations. Therefore heavy metal toxicity in the study area is marginal. The parameters that could serve as baseline data because of their enhanced sensitivity to pollution were (i) concentration of chromium, cobalt, nickel, copper, zinc, arsenic, cadmium and lead in water (ii) pH, TDS and EC for water, (iii) TDS ratio for surface to ground water values and (iv) correlation coefficients between the heavy metals. However, since TDS values are season dependent, this indicator can serve as baseline data when measured during the dry season as was the case in the study. (author)

  12. Evaluation of dredged material proposed for ocean disposal from Red Hook/Bay Ridge project areas, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Red HookIBay Ridge project was to evaluate proposed dredged material from these two areas to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Sediment samples were collected from the Red Hook/Bay Ridge project areas. Tests and analyses were conducted. The evaluation of proposed dredged material from the Red Hook/Bay Ridge project areas consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests. Twenty-four individual sediment core samples were collected from these two areas and analyzed for grain size, moisture content, and total organic carbon (TOC). Three composite sediment samples, representing Red Hook Channel and the two Bay Ridge Reaches to be dredged, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the three Red Hook Bay Ridge sediment composites, were analyzed for metals, pesticides, and PCBS. Benthic acute toxicity tests were performed. Water-column or SPP toxicity tests were performed. Bioaccumulation tests were also conducted.

  13. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  14. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  15. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  16. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  17. Promoting Mentalizing in Pupils by Acting on Teachers: Preliminary Italian Evidence of the "Thought in Mind" Project

    Directory of Open Access Journals (Sweden)

    Annalisa Valle

    2016-08-01

    Full Text Available Mentalization research focuses on different aspects of this topic, highlighting individual differences in mentalizing and proposing programs of intervention for children and adults to increase this ability. The Thought in Mind Project (TiM Project provides training targeted to adults―teachers or parents―to increase their mentalization and, consequently, to obtain mentalization improvement in children. The present research aimed to explore for the first time ever the potential of training for teachers based on the TiM Project, regarding the enhancement of mentalizing of an adult who would have interacted as a teacher with children. For this reason, two teachers – similar for meta-cognitive and meta-emotional skills - and their classes (N=46 were randomly assigned to the training or control condition. In the first case, the teacher participated in training on the implementation of promotion of mentalizing in everyday school teaching strategies; in the second case the teacher participated in a control activity, similar to training for scheduling and methods, but without promoting the implementation of mentalization (in both conditions two meetings lasting about three hours at the beginning of the school year and two supervisions during the school year were conducted. The children were tested by tasks assessing several aspects of mentalization (2nd and 3rd order false belief understanding, Strange Stories, Reading the mind in the Eyes, Mentalizing Task both before and after the teacher participate in the TiM or control training (i.e. at the beginning and at the end of the school year. The results showed that, although some measured components of mentalization progressed over time, only the TiM training group significantly improved in 3rd order false belief understanding and changed - in a greater way compared to the control group - in two of the three components of the Mentalizing Task. These evidences are promising about the idea that the

  18. The Cognitive Behavioral Assessment (CBA Project: Presentation and Proposal for International Collaboration

    Directory of Open Access Journals (Sweden)

    Ezio Sanavio

    2013-11-01

    Full Text Available Aims: The main aim of this paper is to describe almost 30 years of work on psychological assessment using CBA, a research team, and to propose collaboration with Latin countries. Methods: The acronym CBA stands for Cognitive Behavioural Assessment and indicates both an overall approach to clinical assessment and a series of tests. Five general principles formed the basis on which the team developed their questionnaires: (1 assessment is not a passive collection of information, but an active process similar to problem-solving; (2 horizontal integration of questionnaires with other assessment methods; (3 vertical integration and hierarchical structure of assessment questionnaires; (4 idiographic perspective; (5 computer support. Results: The paper briefly presents the most important tests: CBA-2.0, a broad-spectrum Battery for patients who need counselling and/or psychotherapy; CBA-H (Hospital for both in-patients and out-patients suffering from physical illnesses; CBA-SPORT for professional athletes; CBA-Y (young people for adolescents and young adults; CBD-VE (treatment benefits to assess the effectiveness of psychological treatment. Conclusion: These questionnaires have produced over 100 research works, published in Italian journals or presented in conferences. In the near future, we expect important, radical changes and hope to create an international research milieu.

  19. Thorium utilization as a Pu-burner: proposal of Plutonium-Thorium Mixed Oxide (PT-MOX) Project

    International Nuclear Information System (INIS)

    Aizawa, Otohiko

    2000-01-01

    In this paper, a Pu-Th mixed oxide (PT-MOX) project is proposed for a thorium utilization and a plutonium burning. None of plutonium can be newly produced from PT-MOX fuel, and the plutonium mass of about 1 ton can be consumed with one reactor (total heavy metal assumed: 100 tons) for 1 year. In order to consume plutonium produced from usual Light Water Reactor, it should be better to operate one PT-MOX reactor for three to five Light Water Reactors. (author)

  20. A proposal for an infrared/optical beam line for the new Australian synchrotron project

    International Nuclear Information System (INIS)

    Creagh, D.

    2002-01-01

    Full text: In late 2001 the Premier of Victoria, Steve Bracks, announced that the Victorian Government would provide funding of $100,000,000 for the construction of an Australian National Synchrotron on a site on the Monash University campus. The design of the synchrotron and the tentative allocations of beamlines within the synchrotron were taken from the 'Boomerang' designs developed by Dr John Boldeman for the Australian Synchrotron Research Program. The formal administrative structure has recently been put in place. Committees such as the International Machine Advisory Committee (IMAC) and the National Scientific Advisory Committee (NSAC) have been formed and are actively pursuing the goals set down in the strategic plan. Meetings of the NSAC are held monthly, the fifteen members from all states and territories (except Tasmania and the Northern Territory) meeting to discuss how the scientific goals may be achieved. At the last meeting proposals were canvassed for the beamlines to be provided at the synchrotron. One of these beamlines is an IR/Optical Beamline, the subject of this paper. Spectroscopy, using photon energies from the infrared (IR) to the ultraviolet has long been an important analytical tool in scientific investigations. The study of the absorption and scattering (both elastic and Raman) of light by samples, and the fluorescence radiation emitted by samples, can give information about essential for the understanding of the chemical state of the sample, identifying chemical and mineral types present in a sample, and identifying changes in systems Areas of research which would benefit from the use of synchrotron radiation source include: cell biology, in particular the study of the uptake of drugs by cells; surficial processes, for example the in situ study of corrosion processes and the testing of anti-corrosion coatings; organic and inorganic nanotechnology; the study of bandgaps in quantum effect materials; mineralogy, for example determining

  1. A theory of blindsight--the anatomy of the unconscious: a proposal for the koniocellular projections and intralaminar thalamus.

    Science.gov (United States)

    Vakalopoulos, Costa

    2005-01-01

    This paper extends the concepts introduced by the theory of premotor relations to unconscious cognitive mechanisms. According to the theory conscious mechanisms are associated with behavioural diversity, whereas unconscious output is proposed to have an obligatory association with stereotypical behaviour. The respective processes are by definition a function of the type of reafferent motor input. Concepts of simple and complex premotor networks are introduced as a means of describing unconscious and conscious processes, respectively. Evidence shows that unconscious cognitive performance differs qualitatively from conscious mechanisms suggesting parallel processes. Although the postulated anatomical substrates for conscious and unconscious processes will function in this model as parallel segregated networks, it is proposed they are distributed throughout the same cortical areas of the brain. Motor reafference is postulated to be mediated via pallidal projections to the thalamic reticular nucleus, which is known to modulate thalamocortical pathways. The role of the koniocellular pathway of the lateral geniculate nucleus remains an enigma and has some properties in common with the well-described magnocellular and parvocellular projections. There is also much speculation about the intralaminar and midline nuclei, the so-called non-specific thalamus. The paper will examine the distinctive features of thalamocortical networks and the role of the koniocellular pathway and intralaminar nuclei (ILN) of the thalamus and suggest that they form a neuroanatomical substrate for the categorizing of unconscious cognitive processes. The ILN has unique projections back to the basal ganglia, which could serve in constraining associated neocortical networks with stereotypical behaviour and thus putative unconscious processing. Only after establishing such a theoretical framework can one hope to successfully analyze the empirical literature on the syndrome of blindsight, of which a

  2. Surveying the Alentejo continental shelf for minerals and Quaternary environmental changes: preliminary results of the MINEPLAT project survey

    Science.gov (United States)

    Noiva, João; Ribeiro, Carlos; Terrinha, Pedro; Brito, Pedro; Neres, Marta

    2017-04-01

    assessment of good quality sand deposits between approximately 30m and 50m below sea level aims at minimizing this problem that affects the economy of littoral of Alentejo. The MINEPLAT project (Assessment of the mineral resources potential in the continental shelf of Alentejo and of the environmental conditions caused by the tectonic uplift in the Pliocene-Quaternary) aims at assessing the existence of mineral deposits off the Alentejo. The MINEPLAT-1 geophysical survey acquired very high resolution multi-channel reflection seismics, swath bathymetry, backscatter and magnetic data in a test area. The preliminary results show: previously unknown NNW-SSE aligned magnetic anomalies, possibly corresponding to buried Late Cretaceous alkaline rocks; faults affecting recent sediments; well defined patches of sediments associated to morphologic traps. Future work will involve ground-truthing to characterize the shallow deposits. Acknowledgement: This work was funded by Alentejo 2020 contract ALT20-03-0145-FEDER-000013

  3. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992. Volume 3, Model parameters: Sandia WIPP Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-29

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter.

  4. 77 FR 5506 - ORPC Maine, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-02-03

    ... preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Treat Island Tidal Energy Project to be located in Passamaquoddy Bay, between the Town of Eastport and Treat Island, Washington County, Maine. The sole purpose of a preliminary permit, if issued...

  5. Evaluation of water quality conditions near proposed fish production sites associated with the Yakima Fisheries Project. Final report

    International Nuclear Information System (INIS)

    Dauble, D.d.; Mueller, R.P.; Martinson, G.A.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP

  6. 77 FR 9230 - Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  7. 77 FR 9232 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  8. 77 FR 9915 - Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-21

    ... Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  9. 77 FR 12281 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-29

    ... Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\3\\ The priority established by this drawing will...

  10. 77 FR 9232 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  11. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  12. The flora and fauna of a proposed wind turbine site near Royal Road, Prince Edward County, Ontario : preliminary screening of the natural environment

    Energy Technology Data Exchange (ETDEWEB)

    Holder, M.; Leggett, A. [Jacques Whitford Environment Ltd., Markham, ON (Canada)

    2002-07-15

    Calgary based Vision Quest Windelectric has been given zoning approval to install a 22 MW windfarm in Ontario's Prince Edward County. Following a preliminary screening to determine the effect of the windfarm on the natural environment, the Royal Road Windfarm will be developed in stages with up to 32 turbines. Jacques Whitford Environment Ltd. conducted an environmental study which showed that an exploratory wind turbine in the area is not likely to cause major adverse impacts on local fauna and flora. The proposed location of the wind turbine is not in an important bird area (IBA). An IBA is defined as a site providing essential habitat for one of more species of breeding or non-breeding birds. In 1999, Vision Quest initiated a program to examine bird interactions with wind turbines in southern Alberta. It was shown that most species choose flight paths to avoid turbines. The Royal Road site hosts rare alvars which are naturally open landscapes found in shallow soils on flat limestones. The alvars are subject to seasonal drought and flooding and have specific types of vegetation and animals. Since the exploratory wind turbine will be placed outside the IBA area, its impact on birds will be minimized, and it will have minimal effect on migrant, breeding and wintering birds. It was recommended that monitoring take place at the site during the first year of operation. It is also presumed that the wind turbine will not have any impact on mammals, reptiles and amphibians, or insects. However, it was recommended that more information be gathered on bat movement in the area. If placed appropriately, the wind turbine is not expected to impact on rare plants. It was emphasized that in the past, Vision Quest Windelectric has conducted environmental screening activities, and has acted on recommendations to place wind turbines in locations where environmental impact will be minimized. 26 refs., 5 tabs., 2 figs., 2 appendices.

  13. Projected impacts of federal tax policy proposals on mortality burden in the United States: A microsimulation analysis.

    Science.gov (United States)

    Kim, Daniel

    2018-06-01

    The public health consequences of federal income tax policies that influence income inequality are not well understood. I aimed to project the impacts on mortality of modifying federal income tax structures based on proposals by two recent United States (U.S.) Presidential candidates: Donald Trump and Senator Bernie Sanders. I performed a microsimulation analysis using the latest U.S. Internal Revenue Service public-use tax file with state identifiers (2008 tax year), containing nationally-representative data from 139,651 tax returns. I considered five tax plan scenarios: 1) actual 2008 tax structures; proposals in 2016 by then-candidates 2) Trump and 3) Sanders; 4) a modified Sanders plan with higher top tax rates (75%); and 5) a modified Sanders plan with higher top rates plus revenue redistribution to lower-income households (Trump and Sanders plans, respectively. Under the modified Sanders plan including higher top rates, 68,919 (95% CI: 25,221-113,561) fewer deaths/year are projected. Under the modified Sanders plan with redistribution, 333,504 (95% CI: 192,897-473,787) fewer deaths/year are expected. Policies that both raise federal income tax rates and redistribute tax revenue could confer large reductions in the total number of annual deaths among Americans. In this era of high income inequality and growing public support to address the rich-poor gap, policymakers should consider joint federal tax and redistributive policies as levers to reduce the burden of mortality in the United States. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  14. Table - Impacts of the Proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems

    Science.gov (United States)

    This table shows the impacts of the proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems, both with and without the Cross-State Air Pollution Rule.

  15. The Bioinformatics of Integrative Medical Insights: Proposals for an International PsychoSocial and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International PsychoSocial and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  16. The Bioinformatics of Integrative Medical Insights: Proposals for an International Psycho-Social and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International Psycho-Social and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  17. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field.

  18. Communication dated 22 September 2008 received from the Permanent Mission of Germany to the Agency regarding the German proposal on a Multilateral Enrichment Sanctuary Project

    International Nuclear Information System (INIS)

    2008-01-01

    The Secretariat has received a communication dated 22 September 2008 from the Permanent Mission of Germany, forwarding a paper outlining the German proposal on 'the Multilateral Enrichment Sanctuary Project (MESP)'. As requested in the communication, the paper, entitled 'the Multilateral Enrichment Sanctuary Project (MESP) - a Fresh Look at Ensuring Nuclear Fuel Supply' is circulated herewith for the information of Member States

  19. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I; FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field

  20. Small-scale hydro power in the Anniviers Valley. Project Ayer-Nava. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Ayer-Nava. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant near Ayer, a village in the Anniviers Valley (Swiss Alps). Water from the Nava, a steep mountain river, should be lead into a hydraulic scheme for power generation. A hydraulic head of 400 to 550 m is available, depending on the variant considered. The corresponding expected mechanical power is 0.9 to 1.1 MW. For the most promising variant a preliminary project is described (peak electric power: 0.91 MW, annual electrical energy production: 3.1 GWh). The local geology and hydrogeology are presented. The water collection points, conduits and the power station are described. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  1. Archaeological Excavation Report for Proposed Well 199-K-131 in Support of the 100-KR-4 Pump-and-Treat Project

    Energy Technology Data Exchange (ETDEWEB)

    Woody, Dave M.; Prendergast-Kennedy, Ellen L.

    2004-06-22

    An archaeological excavation was conducted at the site of proposed groundwater monitoring well 199-K-131 in support of the 100-KR-4 Pump-and-Treat Project between June 2 and 3, 2004. Excavations confirmed that there were no intact cultural deposits at the proposed well location. This report was prepared to document the findings of the test excavation.

  2. Impact of choice of future climate change projection on growth chamber experimental outcomes: a preliminary study in potato

    Science.gov (United States)

    Leisner, Courtney P.; Wood, Joshua C.; Vaillancourt, Brieanne; Tang, Ying; Douches, Dave S.; Robin Buell, C.; Winkler, Julie A.

    2017-11-01

    Understanding the impacts of climate change on agriculture is essential to ensure adequate future food production. Controlled growth experiments provide an effective tool for assessing the complex effects of climate change. However, a review of the use of climate projections in 57 previously published controlled growth studies found that none considered within-season variations in projected future temperature change, and few considered regional differences in future warming. A fixed, often arbitrary, temperature perturbation typically was applied for the entire growing season. This study investigates the utility of employing more complex climate change scenarios in growth chamber experiments. A case study in potato was performed using three dynamically downscaled climate change projections for the mid-twenty-first century that differ in terms of the timing during the growing season of the largest projected temperature changes. The climate projections were used in growth chamber experiments for four elite potato cultivars commonly planted in Michigan's major potato growing region. The choice of climate projection had a significant influence on the sign and magnitude of the projected changes in aboveground biomass and total tuber count, whereas all projections suggested an increase in total tuber weight and a decrease in specific gravity, a key market quality trait for potato, by mid-century. These results demonstrate that the use of more complex climate projections that extend beyond a simple incremental change can provide additional insights into the future impacts of climate change on crop production and the accompanying uncertainty.

  3. 49 CFR 611.13 - Overall project ratings.

    Science.gov (United States)

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION... to enter into preliminary engineering, final design, or FFGAs. (c) These ratings will be used to: (1) approve advancement of a proposed project into preliminary engineering and final design; (2) Approve...

  4. Proposal and application of an approach based on AHP and ISO/IEC 25000 to support the evaluation of the quality of project management software systems

    Directory of Open Access Journals (Sweden)

    Matheus Henrique Bartolomeu Marques Morais

    2017-06-01

    Full Text Available In the current competitive scenario, organizations are seeking to improve factors that influence the administration and the success of their projects. The adoption of a project management software suitable to organizational requirements contributes to ensure satisfactory results. In this context, this study proposes a methodology to support the quality evaluation of project management software, which is based on the AHP method (Analytic Hierarchy Process as well as on the criteria and sub-criteria of ISO/IEC 25000. The AHP method is used to define the relevance of the criteria and sub-criteria chosen. The proposed methodology was applied to an illustrative case to select the most appropriate software. The alternatives Basecamp, MS Project, Service Desk and Primavera were evaluated. Primavera and MS Project achieved the higher global performance in the process evaluation, since they fulfill 29 of 30 requirements. However, due to some particularities of the evaluated products, Primavera was selected as being the most suitable.

  5. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  6. A proposal of a beam injection device for the proton storage ring of JAERI neutron science project

    International Nuclear Information System (INIS)

    Suzuki, Yasuo

    1998-01-01

    A new injection device (a charge-exchange device) with light and magnetic field, is proposed for a proton storage ring of JAERI Neutron Science Project. This injection device is composed of a neutralizer and an ionizer. The neutralizer strips electrons of H 0 beam into H - one with the undulator magnetic field. The ionizer which is composed of undulator magnets and an optical resonator placed along a straight part in the storage ring, can ionize effectively the H 0 beam excited to n=3 level by a laser beam into H + one. Adopting the 2nd harmonics of Nd : YAG laser, the powerful laser on the market can be used, and the required items of the technological development can be minimized. The energy of the particle beam, however, should be accelerated up to 1.587 GeV by 6% increase from 1.5 GeV. In this device, the non-charge-exchange rate and beam-spill can be minimized by decreasing the deflection angle of the beam which occurs at the charge-exchange process. This method can be realized with exiting technologies and there are not any effects on the trajectory of the ring-circulating proton beam due to scatterings by the foil as the usual charge-exchange devices. This device, therefore, will be an optimal and highly effective method of the least beam-spill as the injector of the high power proton storage ring. (author)

  7. Small-scale hydro power in the Anniviers Valley. Project Chippis-Ricard. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Chippis-Ricard. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant in Chippis, Switzerland. The project takes advantage of an existing irrigation scheme that deviates water from the Navisence River into two successive tunnels (total 1.8 km) and a following channel built on steep mountain sides. The basic idea of the project is to increase the flow rate entering the tunnels from 265 l/s to 1265 l/s and to lead the additional 1000 l/s to a new penstock connected to the second tunnel's outlet. In this way, a hydraulic head of 130 m could be used for power generation for over 600 households (mechanical power: 0.8 to 1.1 MW, annual electrical energy production: 2.5 to 3.6 GWh, depending on the variant considered). The report reviews the history of water use at this location and its present use as well as a feasibility study previously made. The project is described, including water collection points, conduits, the power station and the particular aspects of the joint use of water for power generation and irrigation from mid April to mid September. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  8. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  9. Soil moisture mapping using Sentinel 1 images: the proposed approach and its preliminary validation carried out in view of an operational product

    Science.gov (United States)

    Paloscia, S.; Pettinato, S.; Santi, E.; Pierdicca, N.; Pulvirenti, L.; Notarnicola, C.; Pace, G.; Reppucci, A.

    2011-11-01

    The main objective of this research is to develop, test and validate a soil moisture (SMC)) algorithm for the GMES Sentinel-1 characteristics, within the framework of an ESA project. The SMC product, to be generated from Sentinel-1 data, requires an algorithm able to process operationally in near-real-time and deliver the product to the GMES services within 3 hours from observations. Two different complementary approaches have been proposed: an Artificial Neural Network (ANN), which represented the best compromise between retrieval accuracy and processing time, thus allowing compliance with the timeliness requirements and a Bayesian Multi-temporal approach, allowing an increase of the retrieval accuracy, especially in case where little ancillary data are available, at the cost of computational efficiency, taking advantage of the frequent revisit time achieved by Sentinel-1. The algorithm was validated in several test areas in Italy, US and Australia, and finally in Spain with a 'blind' validation. The Multi-temporal Bayesian algorithm was validated in Central Italy. The validation results are in all cases very much in line with the requirements. However, the blind validation results were penalized by the availability of only VV polarization SAR images and MODIS lowresolution NDVI, although the RMS is slightly > 4%.

  10. Preliminary study on the adjonction of a cooling system and internal target ring to the GEPL project

    International Nuclear Information System (INIS)

    Potaux, D.

    1983-01-01

    Various heavy particle storage rings (LEAR, Indiana, Uppsala) are planned for operation with combined electron cooling system and internal ultra-thin targets. The advantage of adding a similar device to the IPN cyclotron project is discussed [fr

  11. Agile project portfolio management, new solutions and new challenges: preliminary findings from a case study of an agile organization

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Svejvig, Per

    project management framework including two complementary perspectives. One perspective, denoted as classical project management (CPM), highlights key characteristics of traditional PPM practices. A second perspective, denoted as rethinking project management (RPM), highlights characteristics...... of progressive PPM practices. We investigate a large Danish company by applying the research question: “How does agile PPM manifests itself in a real organization and what are the observed pros and cons?” Surprisingly, when summa-rizing our results, we find some traits of concepts from the CPM perspective...... that are manifested in strict control of projects and programs. Furthermore, we find the traits of the RPM perspective more dominating than the CPM perspective, and these traits are mostly found to have desirable effects. CPM traits seem to improve the organi-zation’s ability to cope with uncertainty, a so...

  12. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  13. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)

  14. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN

    International Nuclear Information System (INIS)

    Silva, Eduardo de Assumpcao

    2017-01-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  15. 76 FR 50726 - Riverbank Hydro No. 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-08-16

    ... (FPA), proposing to study the feasibility of the Tuttle Creek Hydroelectric Project (Tuttle Creek Project or project) to be located at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam, on Big Blue River, near Manhattan, Riley County, Kansas. The sole purpose of a preliminary permit, if issued...

  16. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  17. 77 FR 60426 - FFP Project 65 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... lands or waters owned by others without the owners' express permission. The proposed Jackson Point...-1531. FERC Contact: Michael Spencer, (202) 502-6093. Deadline for filing comments, motions to intervene...

  18. Yucca Mountain transportation routes: Preliminary characterization and risk analysis

    International Nuclear Information System (INIS)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R.

    1991-01-01

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history

  19. Physical and institutional vulnerability assessment method applied in Alpine communities. Preliminary Results of the SAMCO-ANR Project in the Guil Valley (French Southern Alps)

    Science.gov (United States)

    Carlier, Benoit; Dujarric, Constance; Puissant, Anne; Lissak, Candide; Viel, Vincent; Bétard, François; Madelin, Malika; Fort, Monique; Arnaud-Fassetta, Gilles

    2015-04-01

    The Guil catchment is particularly prone to torrential and gravitational hazards such as floods, debris flows, landslides or avalanches due to several predisposing factors (bedrock supplying abundant debris, strong hillslope-channel connectivity) in a context of summer Mediterranean rainstorms as triggers. These hazards severely impact the local population (fatalities, destruction of buildings and infrastructures, loss of agricultural land, road closures). Since the second half of the 20th century, the progressive decline of agro-pastoralism and the development of tourism activities led to a concentration of human stakes on alluvial cones and valley bottom, therefore an increase of vulnerability for mountainous communities. Following the 1957 and 2000 catastrophic floods and the 1948 and 2008 avalanche episodes, some measures were taken to reduce exposure to risks (engineering works, standards of construction, rescue training…). Nevertheless, in front of urban expansion (land pressures and political pressures) and obsolescence of the existing protective measures, it is essential to reassess the vulnerability of the stakes exposed to hazards. Vulnerability analysis is, together with hazard evaluation, one of the major steps of risk assessment. In the frame of the SAMCO project designed for mountain risk assessment, our goal is to estimate specific form of vulnerability for communities living in the Upper Guil catchment in order to provide useful documentation for a better management of the valley bottom and the implementation of adequate mitigation measures. Here we present preliminary results on three municipalities of the upper Guil catchment: Aiguilles, Abriès, and Ristolas. We propose an empirical semi-quantitative indicator of potential hazards consequences on element at risk (based on GIS) with an application to different (local and regional scale) scales. This indicator, called Potential Damage Index, enable us to describe, quantify, and visualize direct

  20. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  1. Preliminary evaluation of the Section 1603 treasury grant program for renewable power projects in the United States

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-01-01

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the US to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the US in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 in the absence of the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the US during the construction phase of these wind projects, and 3860 long-term FTE gross jobs during the operational phase. The program's popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread 'gold-plating' or performance problems. (author)

  2. Preliminary geologic framework developed for a proposed environmental monitoring study of a deep, unconventional Marcellus Shale drill site, Washington County, Pennsylvania

    Science.gov (United States)

    Stamm, Robert G.

    2018-06-08

    BackgroundIn the fall of 2011, the U.S. Geological Survey (USGS) was afforded an opportunity to participate in an environmental monitoring study of the potential impacts of a deep, unconventional Marcellus Shale hydraulic fracturing site. The drill site of the prospective case study is the “Range Resources MCC Partners L.P. Units 1-5H” location (also referred to as the “RR–MCC” drill site), located in Washington County, southwestern Pennsylvania. Specifically, the USGS was approached to provide a geologic framework that would (1) provide geologic parameters for the proposed area of a localized groundwater circulation model, and (2) provide potential information for the siting of both shallow and deep groundwater monitoring wells located near the drill pad and the deviated drill legs.The lead organization of the prospective case study of the RR–MCC drill site was the Groundwater and Ecosystems Restoration Division (GWERD) of the U.S. Environmental Protection Agency. Aside from the USGS, additional partners/participants were to include the Department of Energy, the Pennsylvania Geological Survey, the Pennsylvania Department of Environmental Protection, and the developer Range Resources LLC. During the initial cooperative phase, GWERD, with input from the participating agencies, drafted a Quality Assurance Project Plan (QAPP) that proposed much of the objectives, tasks, sampling and analytical procedures, and documentation of results.Later in 2012, the proposed cooperative agreement between the aforementioned partners and the associated land owners for a monitoring program at the drill site was not executed. Therefore, the prospective case study of the RR–MCC site was terminated and no installation of groundwater monitoring wells nor the collection of nearby soil, stream sediment, and surface-water samples were made.Prior to the completion of the QAPP and termination of the perspective case study the geologic framework was rapidly conducted and nearly

  3. A Preliminary Review of U.S. Forest Service Business Practices To Authorize Special Uses, Including Energy Infrastructure Projects, on National Forest System Lands

    Energy Technology Data Exchange (ETDEWEB)

    Wescott, K. L. [Argonne National Lab. (ANL), Argonne, IL (United States); May, J. E. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, H. R. [Argonne National Lab. (ANL), Argonne, IL (United States); Brunner, D. L. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-01

    The U.S. Forest Service (USFS) Special Uses-Lands Program is in jeopardy. Although this program, authorized in Title 36, Part 251, of the U.S. Code of Federal Regulations (36 CFR Part 251), ranks among the top four revenue-generating programs for use of National Forest System (NFS) lands, along with the Timber, Minerals, and Special Uses-Recreation Programs, the Special Uses-Lands Program is in a state of neglect. Repeated cuts in funding (a decrease of 26% from fiscal years 2010 to 2014) are adversely affecting staffing and training, which in turn is affecting timely permit processing and ultimately the public’s ability to use and benefit from NFS lands. In addition, highly experienced staff with valuable institutional knowledge of the program have begun to retire. The ability of the program to function under these dire circumstances can be attributed to the dedication of Special Uses staff to the program and their commitment to the public. The initial focus of this report was to identify opportunities for improving performance of permitting and review for large energy infrastructure-related projects. However, it became clear during this analysis that these projects are generally adequately staffed and managed. This is due in large part to the availability of cost-recovery dollars and the high-profile nature of these projects. However, it also became apparent that larger issues affecting the bulk of the work of the Special Uses-Lands Program need to be addressed immediately. This report is a preliminary examination of the state of the Special Uses-Lands Program and focuses on a few key items requiring immediate attention. Further investigation through case studies is recommended to dig deeper into the Special Uses-Lands Program business process to determine the most costeffective strategies for streamlining the overall process and the metrics by which performance can be evaluated, including for the permitting and tracking of energy infrastructure projects.

  4. 75 FR 2127 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project Project, to be located on Saxtons River, in...

  5. The Detroit Young Adult Asthma Project: Proposal for a Multicomponent Technology Intervention for African American Emerging Adults With Asthma.

    Science.gov (United States)

    MacDonell, Karen; Naar, Sylvie; Gibson-Scipio, Wanda; Bruzzese, Jean-Marie; Wang, Bo; Brody, Aaron

    2018-05-07

    complete a series of computer-delivered asthma education modules matched for length, location, and method of delivery of the intervention session. Control participants will also receive text messages between intervention sessions. Message content will be the same for all control participants and contain general facts about asthma (not tailored). It is hypothesized that youth randomized to multicomponent technology-based intervention will show improvements in medication adherence (primary outcome) and asthma control (secondary outcome) compared with comparison condition at all postintervention follow-ups (3, 6, 9, and 12 months). The proposed study was funded by NHLBI from September 1, 2016 through August 31, 2021. This project will test a brief, technology-based intervention specifically targeting adherence to asthma controller medications in an under-researched population, African American emerging adults. If successful, our multicomponent technology-based intervention aimed at improving adherence to asthma medications has the potential to improve quality of life of minority emerging adults with asthma at relatively low cost. It could eventually be integrated into clinical settings and practice to reach a large number of emerging adults with asthma. ClinicalTrials.gov NCT03121157; https://clinicaltrials.gov/ct2/show/NCT03121157 (Archived by WebCite at http://www.webcitation.org/6wq4yWHPv). ©Karen MacDonell, Sylvie Naar, Wanda Gibson-Scipio, Jean-Marie Bruzzese, Bo Wang, Aaron Brody. Originally published in JMIR Research Protocols (http://www.researchprotocols.org), 07.05.2018.

  6. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  7. Worldwide Evaluations of Quinoa: Preliminary Results from Post International Year of Quinoa FAO Projects in Nine Countries.

    Science.gov (United States)

    Bazile, Didier; Pulvento, Cataldo; Verniau, Alexis; Al-Nusairi, Mohammad S; Ba, Djibi; Breidy, Joelle; Hassan, Layth; Mohammed, Maarouf I; Mambetov, Omurbek; Otambekova, Munira; Sepahvand, Niaz Ali; Shams, Amr; Souici, Djamel; Miri, Khaled; Padulosi, Stefano

    2016-01-01

    Chenopodium quinoa Willd., a high quality grain crop, is resistant to abiotic stresses (drought, cold, and salt) and offers an optimal source of protein. Quinoa represents a symbol of crop genetic diversity across the Andean region. In recent years, this crop has undergone a major expansion outside its countries of origin. The activities carried out within the framework of the International Year of Quinoa provided a great contribution to raise awareness on the multiple benefits of quinoa as well as to its wider cultivation at the global level. FAO is actively involved in promoting and evaluating the cultivation of quinoa in 26 countries outside the Andean region with the aim to strengthen food and nutrition security. The main goal of this research is to evaluate the adaptability of selected quinoa genotypes under different environments outside the Andean region. This paper presents the preliminary results from nine countries. Field evaluations were conducted during 2013/2014 and 2014/2015 in Asia (Kyrgyzstan and Tajikistan), and the Near East and North African countries (Algeria, Egypt, Iraq, Iran, Lebanon, Mauritania, and Yemen). In each country, the trials were carried out in different locations that globally represent the diversity of 19 agrarian systems under different agro-ecological conditions. Twenty-one genotypes of quinoa were tested using the same experimental protocol in all locations consisting in a randomized complete block design (RCBD) with three replicates. Some genotypes showed higher yields and the Q18 and Q12 landraces displayed greater adaptation than others to new environmental conditions. The Q21 and Q26 landraces were evaluated with stable and satisfactory levels of yield (>1 t.ha(-1)) in each of the different trial sites. This production stability is of considerable importance especially under climate change uncertainty. While these results suggest that this Andean crop is able to grow in many different environments, social, and cultural

  8. Preliminary evaluation of exposures of computerized tomography patients in Latin America: IAEA project RLA/9/67

    International Nuclear Information System (INIS)

    Kodlulovich, S.; Silveira, V.; Khoury, H.J.

    2013-01-01

    The aim of this study was to obtain preliminary values of reference levels in CT . Were sent to each country forms with information of radiological protection and routine CT protocols. The CT dose index and absorbed dose to organs was estimated from the technical data for each equipment . The results showed that the total number of examinations performed 92 % are adult patients and 8 % are children. The most frequent examination of the skull was adult (40 % ) and abdomen for children (42 % ) . About the service , 67 % of the equipment are multicut and 76 % have specific protocols for pediatric patients. The CTDI vol values for head exams of adults vary between 2 and 352 mGy for pediatric patients under 1 year 1-191 mGy under 7 years old 5-335 mGy. For chest values ranged from 3 to 26 mGy for adults, between 1 and 89 mGy for children under 1 year and between 3-114 mGy for children between 1 and 7 years. Exams of the abdomen/pelvis of adults the range was 3-47 mGy , between 4-90 mGy for children under 1 year and between 2-31 mGy for children between 1 and 7 years. This study showed that although there are pediatric protocols, there is a wide variation in values of CTDl vol indicating a high potential for dose reduction. This result requires immediate action for optimization and implementation of diagnostic reference values in Latin America

  9. Worldwide Evaluations of Quinoa: Preliminary Results from Post International Year of Quinoa FAO Projects in Nine Countries

    Science.gov (United States)

    Bazile, Didier; Pulvento, Cataldo; Verniau, Alexis; Al-Nusairi, Mohammad S.; Ba, Djibi; Breidy, Joelle; Hassan, Layth; Mohammed, Maarouf I.; Mambetov, Omurbek; Otambekova, Munira; Sepahvand, Niaz Ali; Shams, Amr; Souici, Djamel; Miri, Khaled; Padulosi, Stefano

    2016-01-01

    Chenopodium quinoa Willd., a high quality grain crop, is resistant to abiotic stresses (drought, cold, and salt) and offers an optimal source of protein. Quinoa represents a symbol of crop genetic diversity across the Andean region. In recent years, this crop has undergone a major expansion outside its countries of origin. The activities carried out within the framework of the International Year of Quinoa provided a great contribution to raise awareness on the multiple benefits of quinoa as well as to its wider cultivation at the global level. FAO is actively involved in promoting and evaluating the cultivation of quinoa in 26 countries outside the Andean region with the aim to strengthen food and nutrition security. The main goal of this research is to evaluate the adaptability of selected quinoa genotypes under different environments outside the Andean region. This paper presents the preliminary results from nine countries. Field evaluations were conducted during 2013/2014 and 2014/2015 in Asia (Kyrgyzstan and Tajikistan), and the Near East and North African countries (Algeria, Egypt, Iraq, Iran, Lebanon, Mauritania, and Yemen). In each country, the trials were carried out in different locations that globally represent the diversity of 19 agrarian systems under different agro-ecological conditions. Twenty-one genotypes of quinoa were tested using the same experimental protocol in all locations consisting in a randomized complete block design (RCBD) with three replicates. Some genotypes showed higher yields and the Q18 and Q12 landraces displayed greater adaptation than others to new environmental conditions. The Q21 and Q26 landraces were evaluated with stable and satisfactory levels of yield (>1 t.ha−1) in each of the different trial sites. This production stability is of considerable importance especially under climate change uncertainty. While these results suggest that this Andean crop is able to grow in many different environments, social, and cultural

  10. Preliminary reports on fiscal 2000 results of project for subsidizing international joint research; 2000 nendo kokusai kyodo kenkyu josei jigyo seika hokoku kai yokoshu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    This paper presents preliminary reports on fiscal 2000 results of project for subsidizing international joint research sponsored by NEDO. For international joint research teams doing excellent studies, their research expenses are subsidized, thereby promoting international research exchange, enhancing international level of industrial technology and contributing to the formation of basis for innovative industrial technology. The projects relating to the global environmental field are implemented jointly with RITE. The contents of the report to be published are, in the global environmental field (practicability study), development of oil substitute resources, reproducible resources, and technologies for producing polymeric and plastic materials benign to the earth by microorganism using carbon dioxide. In the substance/material field, the contents of the report are innovative production and device application of tunable photonic crystals using electronic penetration network; development of new synthesis process of innovative nitride, creation and theoretical calculation of electromagnetic function; studies on quantum transportation in superconductor and semiconductor bonding structures; and studies on quantum liquid and solid, and application to materials science and technology. (NEDO)

  11. Preliminary analysis of accidents of the Santa QuitÉRia Project: gaussian methodology for atmospheric dispersion

    International Nuclear Information System (INIS)

    Anjos, Gullit Diego C. dos

    2017-01-01

    The Santa Quitéria Project (PSQ) is an enterprise that aims at the production of phosphate compounds as main products, and of uranium concentrates as by-products, from the minerals of the Itataia deposit. The intended area for implementation of the project is located in the municipality of Santa Quitéria, north central region of the State of Ceará. The U.S. Nuclear Regulatory Commission, lists the basic design accidents for a Uranium Processing Plant, such as the PSQ. Among all these scenarios,fire in uranium extraction cells was the one with the highest doses released. For simulation of the fire event, the atmospheric dispersion model used was the standard Gaussian plume model. The doses were calculated for two sets of meteorological conditions: stability class F, with wind velocity of 1 m/s and class D stability with wind velocity of 4.5 m/s. For PSQ, it was considered that there will be no public individual until after 2000 meters from the release point. The doses corresponding to the Occupationally exposed individuals are: 2.0E-3 mSv (class D) and 5 mSv (Class F), 300 meters away from the event. Analyzing the results, it can be concluded that there are no significant radiological consequences for the occupationally exposed individual, both in the stability class D and the F. For PSQ, it was considered that there will be no public individual until after 2000 meters from the release point. The doses, in mSv, corresponding to the individuals located near the project are: Morrinhos (1.27E-03 mSv - Class D and 3.92E-02 - Class F); Burned (1.41E-03 mSv - Class D and 4.28E-02 - Class F); Lagoa do Mato (<7.94E-04 mSv - Class D and <2.68E-02 mv - Class F). (author)

  12. Preliminary analysis of accidents of the Santa QuitÉRia Project: gaussian methodology for atmospheric dispersion

    Energy Technology Data Exchange (ETDEWEB)

    Anjos, Gullit Diego C. dos, E-mail: gullitcardoso@inb.gov.br [Indústrias Nucleares do Brasil (INB), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    The Santa Quitéria Project (PSQ) is an enterprise that aims at the production of phosphate compounds as main products, and of uranium concentrates as by-products, from the minerals of the Itataia deposit. The intended area for implementation of the project is located in the municipality of Santa Quitéria, north central region of the State of Ceará. The U.S. Nuclear Regulatory Commission, lists the basic design accidents for a Uranium Processing Plant, such as the PSQ. Among all these scenarios,fire in uranium extraction cells was the one with the highest doses released. For simulation of the fire event, the atmospheric dispersion model used was the standard Gaussian plume model. The doses were calculated for two sets of meteorological conditions: stability class F, with wind velocity of 1 m/s and class D stability with wind velocity of 4.5 m/s. For PSQ, it was considered that there will be no public individual until after 2000 meters from the release point. The doses corresponding to the Occupationally exposed individuals are: 2.0E-3 mSv (class D) and 5 mSv (Class F), 300 meters away from the event. Analyzing the results, it can be concluded that there are no significant radiological consequences for the occupationally exposed individual, both in the stability class D and the F. For PSQ, it was considered that there will be no public individual until after 2000 meters from the release point. The doses, in mSv, corresponding to the individuals located near the project are: Morrinhos (1.27E-03 mSv - Class D and 3.92E-02 - Class F); Burned (1.41E-03 mSv - Class D and 4.28E-02 - Class F); Lagoa do Mato (<7.94E-04 mSv - Class D and <2.68E-02 mv - Class F). (author)

  13. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume III. Preferred utilization options

    International Nuclear Information System (INIS)

    1978-11-01

    The technical, economic, environmental, and institutional considerations that must be resolved before implementing options to recover energy from the heated SRP effluent are examined. Detailed hypothetical siting options and expected economic returns are examined for power generation, prawn production, and one industrial park scenario. The likely indirect effects on regional population, income, taxes, and infrastructure requirements if the industrial park scenario is implemented are also projected. Recommendations for follow-on studies to make possible an informed go/no-go decision for implementing attractive waste heat options using reject SRP effluent are included

  14. Preliminary simulation of degassing of natural gases dissolved in groundwater during shaft excavation in Horonobe underground research project

    International Nuclear Information System (INIS)

    Yamamoto, Hajime; Shimo, Michito; Kunimaru, Takanori; Kurikami, Hiroshi

    2007-01-01

    In Neogene-Quaternary sedimentary basins, natural gases such as methane are often dissolved in groundwater significantly. In this paper, two-phase flow simulations incorporating the degassing of methane, and carbon dioxide, were performed for the shaft excavation in Horonobe underground research project. The results drawn from the simulations are summarized as follows. 1) As depth increases, degassing and gas inflow occurs significantly. 2) Degassing increases the compressibility of pore fluids, resulting in slow changes in groundwater pressures. 3) Although the occurrence of gas phase decreases water mobility, the influence of the dissolved gas on the groundwater inflow rate to the shaft was small. (author)

  15. Water transfer and major environmental provisions of the Central Valley Project Improvement Act: A preliminary economic evaluation

    Science.gov (United States)

    Loomis, John B.

    1994-06-01

    Increasing block water pricing, water transfer, and wildlife refuge water supply provisions of the Central Valley Project (CVP) Improvement Act are analyzed in terms of likely farmer response and economic efficiency of these provisions. Based on a simplified partial equilibrium analysis, we estimate small, but significant water conservation savings due to pricing reform, the potential for substantial water transfers to non-CVP customers in severe drought years when the water price exceeds 110 per acre foot (1 acre foot equals 1.234 × 103 m3) and positive net benefits for implementation of the wildlife refuge water supply provisions. The high threshold water price is partly a result of requiring farmers to pay full cost on transferred water plus a surcharge of 25 per acre foot if the water is transferred to a non-CVP user. The act also sets an important precedent for water pricing reform, water transfer provisions, and environmental surcharges on water users that may find their way to other Bureau of Reclamation projects.

  16. Preliminary Public Design Report for the Texas Clean Energy Project: Topical Report - Phase 1, June 2010-July 2011

    Energy Technology Data Exchange (ETDEWEB)

    Mattes, Karl

    2012-02-01

    Summit Texas Clean Energy, LLC (Summit) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO2) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin sub-bituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H2) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. Front-end Engineering and Design (FEED) commenced in June 2010 and was completed in July 2011, setting the design basis for entering into the detailed engineering phase of the project. During Phase 1, TCEP conducted and completed the FEED, applied for and received its air construction permit, provided engineering and other technical information required for development of the draft Environmental Impact Statement, and

  17. THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

    2003-08-01

    This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1

  18. Preliminary evaluations of social and environmental impacts from mine-industrial project - uranium of Lagoa Real, Bahia, Brazil

    International Nuclear Information System (INIS)

    Negrao, F.I.; Oliveira, G.G. de; Zanetti, J.C.; Cunha, R.P.P. da.

    1990-01-01

    The Uranium Province of Lagoa Real is situated in the central south of the State of Bahia and constitutes at the moment the second uranium resource of Brazil, containing, in several anomalies, as available resource, 93.850 ton. of U sub(3) O sub(8). The Uranio do Brasil S.A. develops a mine-industrial complex in this Province with the aim to extract and benefit uranium and intending to improve in 1992. The project is considered with high hazard, because involves te management of radioactive material, and becomes necessary an available of environmental impact, in accordance with CONAMA 001/86 and an active participation of the society. This paper aims to indentify the social and environmental impacts of this process, as a contribution of this important discussion. (author)

  19. Social conflict in the execution stage of power generation projects: theoretical elements for a social viability proposal

    Directory of Open Access Journals (Sweden)

    Vladimir Mesén Montenegro

    2014-05-01

    Full Text Available The social effects of power generation projects will be analyzed in this paper, based on the paradigms that conceived such projects and using the theoretical approaches that generate the constructive practices that cover the social world of the communities in the areas of influence and the different persons involved (participants, beneficiaries, affected parties and opponents and the origin of the different social and environmental conflicts. The article also focuses on how, within this juncture, the project is an external agent that enters the social fabric of one or more communities, generating a series of subjective and objective breakdowns, in a symbolic world of meanings, customs, traditions and forms of psychological and social relationships with the natural and human environment, which are part of the variables that favor social change.

  20. Learning from the experience: preliminary results of integration experiments within PRE-EARTHQUAKES EU-FP7 Project.

    Science.gov (United States)

    Tramutoli, V.; Inan, S.; Jakowski, N.; Pulinets, S.; Romanov, A.; Filizzola, C.; Shagimuratov, I.; Pergola, N.; Genzano, N.; Lisi, M.; Alparslan, E.; Wilken, V.; Tsybulia, K.; Romanov, A.; Paciello, R.; Balasco, M.; Zakharenkova, I.; Ouzounov, D.; Papadopoulos, G. A.; Parrot, M.

    2012-04-01

    PRE-EARTHQUAKES (Processing Russian and European EARTH observations for earthQUAKE precursors Studies) EU-FP7 project is devoted to demonstrate - integrating different observational data, comparing and improving different data analysis methods - how it is possible to progressively increase reliability of short term seismic risk assessment. Three main testing area were selected (Italy, Turkey and Sakhalin ) in order to concentrate observations and integration efforts starting with a learning phase on selected event in the past devoted to identify the most suitable parameters, observations technologies, data analysis algorithms. To this aim events offering major possibilities (variety) of integration were particularly considered - Abruzzo EQ (April 6th 2009 Mw 6.3) for Italy, Elazig EQ (March 8th 2010 Mw 6.1) for Turkey and Nevelsk EQ (August 2nd 2007 Mw 6.2) for Sakhalin - without excluding other significant events occurred during 2011 like the ones of Tōhoku in Japan and Van in Turkey. For these events, different ground (80 radon and 29 spring water stations in Turkey region, 2 magneto-telluric in Italy) and satellite (18 different systems) based observations, 11 data analysis methods, for 7 measured parameters, have been compared and integrated. Results achieved by applying a validation/confutation approach devoted to evaluate the presence/absence of anomalous space-time transients in single and/or integrated observation time-series will be discussed also in comparison with results independently achieved by other authors.

  1. Earthquake location determination using data from DOMERAPI and BMKG seismic networks: A preliminary result of DOMERAPI project

    Energy Technology Data Exchange (ETDEWEB)

    Ramdhan, Mohamad [Study Program of Earth Science, Institut Teknologi Bandung, Jl. Ganesa 10, Bandung, 40132 (Indonesia); Agency for Meteorology, Climatology and Geophysics of Indonesia (BMKG) Jl. Angkasa 1 No. 2 Kemayoran, Jakarta Pusat, 10720 (Indonesia); Nugraha, Andri Dian; Widiyantoro, Sri [Global Geophysics Research Group, Faculty of Mining and Petroleum Engineering, Institut TeknologiBandung, Jl. Ganesa 10, Bandung, 40132 (Indonesia); Métaxian, Jean-Philippe [Institut de Recherche pour le Développement (IRD) (France); Valencia, Ayunda Aulia, E-mail: mohamad.ramdhan@bmkg.go.id [Study Program of Geophysical Engineering, Institut Teknologi Bandung, Jl. Ganesa 10, Bandung, 40132 (Indonesia)

    2015-04-24

    DOMERAPI project has been conducted to comprehensively study the internal structure of Merapi volcano, especially about deep structural features beneath the volcano. DOMERAPI earthquake monitoring network consists of 46 broad-band seismometers installed around the Merapi volcano. Earthquake hypocenter determination is a very important step for further studies, such as hypocenter relocation and seismic tomographic imaging. Ray paths from earthquake events occurring outside the Merapi region can be utilized to delineate the deep magma structure. Earthquakes occurring outside the DOMERAPI seismic network will produce an azimuthal gap greater than 180{sup 0}. Owing to this situation the stations from BMKG seismic network can be used jointly to minimize the azimuthal gap. We identified earthquake events manually and carefully, and then picked arrival times of P and S waves. The data from the DOMERAPI seismic network were combined with the BMKG data catalogue to determine earthquake events outside the Merapi region. For future work, we will also use the BPPTKG (Center for Research and Development of Geological Disaster Technology) data catalogue in order to study shallow structures beneath the Merapi volcano. The application of all data catalogues will provide good information as input for further advanced studies and volcano hazards mitigation.

  2. Preliminary analysis of projected construction employment effects of building the defense waste processing facility at the Savannah River Plant

    International Nuclear Information System (INIS)

    Garey, R.B.; Blair, L.M.; Craig, R.L.; Stevenson, W.

    1981-09-01

    This study estimates the probable effects of constructing the DWPF on the surrounding labor markets. Analyses are based on data from the local and regional labor markets, information from experts on local construction activities, information on the labor requirements of the Vogtle Power Plant (two nuclear reactors) being built by Georgia Power Company in Burke County, Georgia, and an econometric model of the construction labor market, based on several surveys of workers building three Tennessee Valley Authority nuclear power plants. The results of this study are reported in three parts. In Part I, completed in May 1980, we describe the 1979 (base year) employment levels within the local and regional labor markets surrounding SRP, from which most DWPF construction workers are likely to be drawn. In Part II, completed in June 1980, we define the four local sources of construction employment that will compete for craftsmen when DWPF is built. Also in Part II, most of the projected impacts of the DWPF reference immobilization alternative (one of several alternatives that may be chosen) are reported. Several construction schedules and labor demand scenarios for the reference alternative are considered. In Part III, completed in January 1981, most of the estimated impacts of the DWPF alternative referred to as the staged process alternative are reported. Several construction schedules and labor demand scenarios for this alternative are considered

  3. Results from preliminary experiments of the 1 MeV 0.1 A D- project at CEA-Cadarache

    International Nuclear Information System (INIS)

    Simonin, A.; Fumelli, M.; Jequier, F.; Pamela, J.; Bucalossi, J.; Bottereau, J.M.; Brugnetti, R.

    1994-01-01

    A 1 MeV 0.1 A D - -beam acceleration experiment under preparation is described. It will study a simplified concept of negative ion beam electrostatic accelerator called SINGAP. Some critical HV components, like a large MV bushing or protection systems against the HV vacuum breakdowns will also be tested. The experiments reported here have been conducted during the preparatory phase of this MeV project. A negative ion source was developed and produced 1 A D - beams and j(D - )=12 mA/cm 2 beams. A new type of extraction grid was designed which traps almost 100% of the stray electrons extracted from the source plasma. A new emittance diagnostic has been successfully tested with 60-100 keV D - beams. A 1 MV 120 mA Haefely power supply has been moved from KfK, adapted and operated on a resistive load at the nominal operating characteristics. (author) 5 refs.; 6 figs

  4. Flexible work hours, health and well-being in the European Union: preliminary data from a SALTSA project.

    Science.gov (United States)

    Costa, G; Akerstedt, T; Nachreiner, F; Baltieri, F; Folkard, S; Frings Dresen, M; Gadbois, C; Gartner, J; Grzech Sukalo, H; Harma, M; Kandolin, I; Silverio, J; Simoes, A

    2001-12-01

    Demand for flexible work hours (FWH) is increasing in Europe aimed at increasing the number of production hours on one hand, and, on the other, reducing individual working hours and/or increasing autonomy and control on them. In view of the lack of knowledge of the effects of FWH on health and safety, we started a pilot project, funded by the Joint Programme for Working Life Research in Europe (SALTSA), aimed at: a) comparing the most relevant national legislation and how the EU Directive 93/104 "concerning certain aspects of working time" has been implemented in the member States; b) reporting prevalence and trend of FWH in Europe according to the three EU Surveys on Working Conditions carried out in the last decade; c) collecting practical examples of innovative FWH; d) evaluating their impact on health and safety in relation to work sectors, job demands, social life, aging and gender. Consequent actions are going to include information and consultancy for pertinent authorities and social parties involved, as well as training programmes for Union officials and similar groups concerning the organisation of FWH according to ergonomic principles.

  5. The ability to manage self-proposed projects between 1;3 and 2;0 years old: a study of inhibition and resistance to interference

    OpenAIRE

    Estanislao Pastor-Mallol; Edith Santó-Rañé

    2015-01-01

    This study examines very young children's ability to manage self-proposed projects by using the inhibitory function and resistance to interference. In a natural environment and using an observational method, we conducted a longitudinal study of a sample observed at 1;3, 1;6, 1;9 and 2;0 years old. The research was divided into two studies which followed different procedures and looked at the projects carried out, the interferences produced and the functioning of inhibition. We observed signif...

  6. The National Shipbuilding Program. Preliminary Impact Analysis of Proposed Revisions of National Ambient Air Quality Standard for Ozone and Particulate Matter

    National Research Council Canada - National Science Library

    1997-01-01

    ...) and particulate matter (PM). The analysis was performed to provide information to the U.S. ship building and ship repair industry, so that companies in that industry could determine whether to submit comments on these EPA proposals...

  7. 75 FR 22890 - Notice of Extension of Public Comment Period for the Proposed Keystone XL Pipeline Project Draft...

    Science.gov (United States)

    2010-04-30

    ... notice that listed the public comment meetings and additional information on the DEIS was published in.... By mail addressed to: Elizabeth Orlando, Keystone XL Project Manager, U.S. Department of State, OES... screening. Fax to: (202) 647-1052, attention Elizabeth Orlando. FOR FURTHER INFORMATION CONTACT: For...

  8. International Socio-Technical Challenges for Geological Disposal (InSOTEC): Project Aims and Preliminary Results - 12236

    Energy Technology Data Exchange (ETDEWEB)

    Bergmans, Anne; Schroeder, Jantine [University of Antwerp, Faculty of Political and Social Sciences, 2000 Antwerp (Belgium); Simmons, Peter [University of East Anglia, School of Environmental Sciences, NR4 7TJ Norwich (United Kingdom); Barthe, Yannick; Meyer, Morgan [CNRS, Ecole des Mines, 75272 Paris (France); Sundqvist, Goeran [Universitetet i Oslo, Centre for Studies of Technology, Innovation and Culture, 0851 Oslo (Norway); Martell, Merixell [MERIENCE Strategic Thinking, 08734 Olerdola (Spain); Kallenbach-Herbert, Beate [Oeko Institut, 64295 Darmstadt (Germany)

    2012-07-01

    InSOTEC is a social sciences research project which aims to generate a better understanding of the complex interplay between the technical and the social in radioactive waste management and, in particular, in the design and implementation of geological disposal. It currently investigates and analyses the most striking socio-technical challenges to implementing geological disposal of radioactive waste in 14 national programs. A focus is put on situations and issues where the relationship between the technical and social components is still unstable, ambiguous and controversial, and where negotiations are taking place in terms of problem definitions and preferred solutions. Such negotiations can vary from relatively minor contestation, over mild commotion, to strong and open conflicts. Concrete examples of socio-technical challenges are: the question of siting, introducing the notion of reversibility / retrievability into the concept of geological disposal, or monitoring for confidence building. In a second stage the InSOTEC partners aim to develop a fine-grained understanding of how the technical and the social influence, shape, build upon each other in the case of radioactive waste management and the design and implementation of geological disposal. How are socio-technical combinations in this field translated and materialized into the solutions finally adopted? With what kinds of tools and instruments are they being integrated? Complementary to providing better theoretical insight into these socio-technical challenges/combinations, InSOTEC aims to provide concrete suggestions on how to address these within national and international contexts. To this end, InSOTEC will deliver insights into how mechanisms for interaction between the technical community and a broad range of socio-political actors could be developed. (authors)

  9. Preliminary test of the MONDO project secondary fast and ultrafast neutrons tracker response using protons and MIP particles

    Science.gov (United States)

    Traini, G.; Battistoni, G.; Giacometti, V.; Gioscio, E.; Marafini, M.; Mirabelli, R.; Pinci, D.; Sarti, A.; Sciubba, A.; Patera, V.

    2018-04-01

    The risk of developing a second malignant cancer as a late time consequence of undergoing a treatment, is one of the main concerns in particle therapy (PT). Since neutrons can release a significant dose far away from the tumour region, a precise characterisation of their production point, kinetic energy and abundance is eagerly needed. The treatment planning system (TPS) software that predicts the normal tissue toxicity in the target region and the risk of late complications in the whole body is currently based on the poorly known production cross-sections and will greatly benefit from improved precision double differential measurements. The MONDO (MOnitor for Neutron Dose in hadrOntherapy) project aims to build an ultrafast neutron tracker that could be used to characterise the production of secondary neutrons with energies in the 20–400 MeV range. The neutron tracking will proceed via the detection of recoil protons produced in two consecutive (n, p) elastic scattering interactions. The MONDO detector consists of a 10 × 10 × 20 cm3 matrix of thin scintillating fibres, arranged in orthogonally oriented layers. A compact read-out sensor with single photon detection capabilities employing the CMOS SPAD technology has been developed in collaboration with Fondazione Bruno Kessler (FBK). The detector will be completed by the end of 2018. A 4 × 4 × 4.8 cm3 prototype has been built using 250 μ m thick scintillating fibres of squared section and was tested using a proton beam and minimum ionising particles. In this contribution we present the experimental results related to the prototype test performed with a proton beam at the Proton Therapy Centre of the Trento Hospital (PTC) in May 2017. The results are compared with the results of a Monte Carlo simulation performed with the FLUKA software.

  10. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  11. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  12. Sugarcane straw harvest effects on soil quality and plant growth: preliminary data synthesis of a multi-local project running in Brazil

    Science.gov (United States)

    Cherubin, Maurício; Cerri, Carlos E. P.; Feigl, Brigitte J.; Cerri, Carlos C.

    2017-04-01

    Brazil is the largest sugarcane producer in the world, and consequently, it is one of major players in the bioenergy production sector. Despite that, growing demands for bioenergies have raised the interest of Brazilian sugarcane industry to harvest the sugarcane straw left on the field for cellulosic ethanol production and/or bioelectricity cogeneration. However, crop residues have a key role in the soil, affecting directly or indirectly multiple soil functions and related ecosystem services. Therefore, indiscriminate straw harvest could jeopardize soil quality, decreasing its capacity to sustain plant productivity over time. In order to evaluate the potential impacts of sugarcane straw harvest on soil quality and plant growth, we are conducting since 2014 a multi-local project across central-southern Brazil, the main core of sugarcane production in the world. A wide range of soil chemical, physical and biological parameters, as well as, plant biomass production has been quantified under increasing straw harvest intensities. Our preliminary findings have showed that short-term straw harvest management did not affect total organic C stocks; however, high straw harvest led to significant reduction in labile C forms (e.g., microbial biomass C and N), and abundance of microbial communities as well. Sugarcane straw harvest affects soil nutrient cycling, since significant amount of nutrients are removed annually by straw, especially in top (green) leaves. In addition, our data show that straw acts as a thermal insulator, decreasing soil temperature amplitude and keeping soil moisture for a longer time. Straw harvest management did not affect sugarcane yields in the first two crop seasons. Based on this first synthesis of the project, we conclude that short-term sugarcane straw harvest led to soil changes, especially in more sensitive and dynamic properties, which did not affect the plant yield. However, long-term impacts should be monitored towards a better

  13. Quality Indicators in Laboratory Medicine: from theory to practice. Preliminary data from the IFCC Working Group Project "Laboratory Errors and Patient Safety".

    Science.gov (United States)

    Sciacovelli, Laura; O'Kane, Maurice; Skaik, Younis Abdelwahab; Caciagli, Patrizio; Pellegrini, Cristina; Da Rin, Giorgio; Ivanov, Agnes; Ghys, Timothy; Plebani, Mario

    2011-05-01

    The adoption of Quality Indicators (QIs) has prompted the development of tools to measure and evaluate the quality and effectiveness of laboratory testing, first in the hospital setting and subsequently in ambulatory and other care settings. While Laboratory Medicine has an important role in the delivery of high-quality care, no consensus exists as yet on the use of QIs focussing on all steps of the laboratory total testing process (TTP), and further research in this area is required. In order to reduce errors in laboratory testing, the IFCC Working Group on "Laboratory Errors and Patient Safety" (WG-LEPS) developed a series of Quality Indicators, specifically designed for clinical laboratories. In the first phase of the project, specific QIs for key processes of the TTP were identified, including all the pre-, intra- and post-analytic steps. The overall aim of the project is to create a common reporting system for clinical laboratories based on standardized data collection, and to define state-of-the-art and Quality Specifications (QSs) for each QI independent of: a) the size of organization and type of activities; b) the complexity of processes undertaken; and c) different degree of knowledge and ability of the staff. The aim of the present paper is to report the results collected from participating laboratories from February 2008 to December 2009 and to identify preliminary QSs. The results demonstrate that a Model of Quality Indicators managed as an External Quality Assurance Program can serve as a tool to monitor and control the pre-, intra- and post-analytical activities. It might also allow clinical laboratories to identify risks that lead to errors resulting in patient harm: identification and design of practices that eliminate medical errors; the sharing of information and education of clinical and laboratory teams on practices that reduce or prevent errors; the monitoring and evaluation of improvement activities.

  14. Study for Action Plan proposal on some issues of the national nuclear infrastructure for the new research reactor project in phase 1&2

    International Nuclear Information System (INIS)

    Cao Hong Lan; Bui Dang Hanh; Nguyen Nhi Dien

    2017-01-01

    The Project on construction for a new research reactor in Vietnam is under preparation. At the same time, it is necessary to prepare a firm and comprehensive national nuclear infrastructure which is aimed to implement smoothly and ensure safety and security for the project. How is the status of the nuclear infrastructure for research reactor project in Vietnam, how can it be assessed, what is the assessment used for and what are we going to do with that? So, all of these things are the goals set out to address in this Task. However, due to time constraints and conformity with requirement of project progress, this Task assessed only 8 critical issues in infrastructure in phase 1&2, including National position; Management; Legislative framework; Regulatory framework; Human resource development; Radioactive waste; Site survey, site selection and evaluation; and Environmental protection. Conditions and criteria in the documents on milestones and assessment of the national nuclear infrastructure to support a new research reactor project of the International Atomic Energy Agency (IAEA) were used as bases for assessing the Vietnam's infrastructure status. The results of the Task are assessment and identification for gaps which need to be addressed and proposing for a plan on completing the national nuclear infrastructure for the research reactor project on 8 issues in stages 1&2. (author)

  15. Solar electricity power station building. A preliminary project investigation for “PIRIN TEX LTD.” – Gotze Delchgev using

    International Nuclear Information System (INIS)

    Kolev, Boyko; Todorieva, Vanja

    2009-01-01

    The total solar energy absorbed by Earth's atmosphere, oceans and land masses is approximately 3,850,000 exa joules (EJ=1018 J) per year. In 2005, this was more energy in one hour than the world used in one year. Photosynthesis captures approximately 3,000 EJ per year in biomass. The amount of solar energy reaching the surface of the planet is so vast that in one year it is about twice as much as will ever be obtained from all of the Earth's non-renewable resources of coal, oil, natural gas, and mined uranium combined. Natural gas crisis such as this from January 2009 in Bulgaria turn into the best investments the development of technology for renewable energy sources using especially solar energy using for electricity production and water heating. The aims of this article are: To develop a preliminary project for solar electricity power station build-ing; To estimate the profits of solar energy used for electricity production and water heating. Keywords: renewable energy sources, solar energy accumulation, solar electricity power station, natural gas crisis

  16. Final terms of reference for the Environmental Impact Assessment (EIA) report for the proposed Suncor Energy Inc., Project Millennium, Fort McMurray, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-04

    This document identifies the information that Suncor will need to prepare and submit as an Environmental Impact Assessment (EIA) report as part of its application to the Alberta Energy and Utilities Board for the construction, operation and reclamation of its proposed Millenium extension of the Steepbank Mine. The report must identify development activities, describe environmental effects, mitigation options and residual effects that are relevant to the assessment of the project. The report must also include a description of the processing facilities, mining activities, utilities and transportation. Similarly, the report must provide a full description of the environmental management systems in place, as well as details of the proposed management of air emissions, water, waste, hydrocarbons, and chemicals. The report will be made public to allow for participation from those who may be affected by the project. This includes residents and organizations in the Fort McMurray, Fort McKay, and Fort Chipewyan areas.

  17. Cultural Resources Survey and Archeological Inventory of the Proposed Carrollton Revetment Project, Orleans Parish, Louisiana, Phase 1. Volume 1 of 2

    Science.gov (United States)

    2004-11-01

    The proposed project area has a humid sub- kin ash (Fraxinus profunda ), green ash (Frax- tropical climate with prevailing southerly winds. inus...leans on June 27, 1967, is 39’ (1020 F) (Magill Salix nigra Black willow 1990:6; Trahan 1989; Peters and Beall 2002). Fraxinus profunda Pumpkin ash...In addition, the Internet radio show "New bait blue glass jar embossed "BROM... /EM...," Orleans Nostalgia" references radio advertise- refers to a

  18. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  19. Land-use changes on the proposed Clinch River Breeder Reactor demonstration. Project site: 1924 to 1972

    International Nuclear Information System (INIS)

    McConathy, R.K.

    1976-02-01

    A report is presented which documents the use history of the CRBRDP site and is also the first in a series to describe ecological areas on the ERDA Oak Ridge Reservation meeting criteria for scientific study sites or natural areas worthy of preservation. The CRBRDP area under discussion is located in Roane County, Tennessee and is a part of the land purchased in 1942 by the United States Government for the Manhattan Project, now known as the ERDA Oak Ridge Reservation

  20. Overcoming Dietary Assessment Challenges in Low-Income Countries: Technological Solutions Proposed by the International Dietary Data Expansion (INDDEX) Project

    Science.gov (United States)

    Coates, Jennifer C.; Colaiezzi, Brooke A.; Bell, Winnie; Charrondiere, U. Ruth; Leclercq, Catherine

    2017-01-01

    An increasing number of low-income countries (LICs) exhibit high rates of malnutrition coincident with rising rates of overweight and obesity. Individual-level dietary data are needed to inform effective responses, yet dietary data from large-scale surveys conducted in LICs remain extremely limited. This discussion paper first seeks to highlight the barriers to collection and use of individual-level dietary data in LICs. Second, it introduces readers to new technological developments and research initiatives to remedy this situation, led by the International Dietary Data Expansion (INDDEX) Project. Constraints to conducting large-scale dietary assessments include significant costs, time burden, technical complexity, and limited investment in dietary research infrastructure, including the necessary tools and databases required to collect individual-level dietary data in large surveys. To address existing bottlenecks, the INDDEX Project is developing a dietary assessment platform for LICs, called INDDEX24, consisting of a mobile application integrated with a web database application, which is expected to facilitate seamless data collection and processing. These tools will be subject to rigorous testing including feasibility, validation, and cost studies. To scale up dietary data collection and use in LICs, the INDDEX Project will also invest in food composition databases, an individual-level dietary data dissemination platform, and capacity development activities. Although the INDDEX Project activities are expected to improve the ability of researchers and policymakers in low-income countries to collect, process, and use dietary data, the global nutrition community is urged to commit further significant investments in order to adequately address the range and scope of challenges described in this paper. PMID:28300759