  1. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  2. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  3. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  4. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-05

    ... Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in.... The proposed project would consist of: (1) 4 OCGen\\TM\\ hydrokinetic tidal devices each consisting of...

  5. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14290-000] Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...), proposing to study the feasibility of the Porcupine Dam Hydropower Project to be located on the East Fork of...

  6. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  7. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  8. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  9. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  10. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  11. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  12. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  13. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  14. Preliminary report on the Northern California Power Agency's Notice of Intention to seek certification for NCPA Geothermal Project No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This preliminary report on the Northern California Power Agency (NCPA) geothermal power plant proposal has been prepared pursuant to California Public Resources Code Sections 25510, 25512, and 25540. It presents the preliminary Findings of fact and Conclusions adopted by the Commission Committee assigned to conduct proceedings on the Notice. In addition, the report contains a description of the proposed project, a summary of the proceedings to date, and local, state, and Federal government agency comments on the proposal. Finally, the report presents the Committee's view of those issues that require further consideration in future proceedings on the Notice. Pursuant to Public Resources Code Sections 25512 and 25540, the report presents preliminary Findings and Conclusions on: (1) conformity to the forecast of statewide and service area electric power demands; (2) the degree to which the proposed site and facility conform with applicable local, regional, state and Federal standards, ordinances, and laws; and (3) the safety and reliability of the facility.

  15. A preliminary social and economic assessment of the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Cluett, C.; Bolton, P.; York, K.; Wood, M.; Radford, L.

    1981-07-01

    This report provides a preliminary assessment of the social and economic impacts that could be caused by the construction and operation of a nuclear waste repository on the Hanford Site near Richland, Washington. This assessment involved assembling a comprehensive data base for the local Tri-Cities impact area and the surrounding region, establishing a network of local and regional contacts, making preliminary judgments about potential social impacts caused by the proposed repository, and recommending further research. This report concludes that growth effects under the anticipated work force scenario are expected to be relatively minor. With a strong public involvement program on the part of the project developers, including an ongoing dialogue with local and regional planners, potential socio-economic impacts can be anticipated and managed effectively. Specific recommendations are made for filling gaps in the available data, exploring key issues in more detail, and improving the analysis of social impacts. The report was prepared by the Battelle-Human Affairs Research Center in 1980 and 1981

  16. Preliminary results on the cryogenic target for FIREX project

    International Nuclear Information System (INIS)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-01-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (about 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Liquid fuel is fed into the shell by the feeder and is soaked up by the foam material through capillarity. The fuel is then solidified. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H 2 liquefaction using a dummy target instead of the foam target. Judging from these results, the target assembled in the same process as the dummy target is sure to be practicable for the FIREX project. (authors)

  17. Preliminary methodological proposal for estimating environmental flows in projects approved by the ministry of environment and sustainable development (MADS), Colombia

    International Nuclear Information System (INIS)

    Pinilla Agudelo, Gabriel A; Rodriguez Sandoval, Erasmo A; Camacho Botero, Luis A

    2014-01-01

    A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA) in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogota (UNC). The proposed method begins with an evaluation of hydrological criteria, continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macro invertebrates, riparian vegetation, and fish). The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS.

  18. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  19. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  20. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13214-002; 14274-000] Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 12 Hydro Partners (Lock 12), and FFP Project 107 LLC (FFP 107) filed preliminary permit...

  1. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13213-002; 14271-000] Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications Accepted..., 2011, Lock 14 Hydro Partners (Lock 14), and FFP Project 106 LLC (FFP 106) filed preliminary permit...

  2. Caribbean alternative energy programme project proposals

    International Nuclear Information System (INIS)

    1978-03-01

    This is the third report to follow the Project Group Meeting on ALTERNATIVE ENERGY RESOURCES, Barbados, September, 1977. It consists of summaries of projects proposals identified at the Meeting. The first two reports have been previously circulated. The first CSC(77)AER-1 covers the background, proceedings and recommendations resulting from the meeting as well as containing a brief outline of the project proposals. The country papers and technical papers that were presented at the meeting or served as background material, form the second report, CSC(77)AER-2. Copies of the first two reports can be obtained on request to the Commonwealth Science Council. Projects with potential for making significant progress in the short term have been marked with an asterisk

  3. 77 FR 74845 - AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit

    Science.gov (United States)

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115-001] AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit Take notice that AJT Mining Properties, Inc., permittee for the proposed Yeldagalga Creek Hydroelectric Project, has requested that its preliminary permit...

  4. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  5. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  6. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  7. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  8. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  9. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  10. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  11. Proposed preliminary definition of the disturbed-zone boundary appropriate for a repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Langkopf, B.S.

    1987-12-01

    Some of the calculations that support the licensing of a repository for high-level radioactive waste will use the regulatory concept of a disturbed zone. The Nevada Nuclear Waste Storage Investigations (NNWSI) project must determine the location of the boundary of the disturbed zone for use in these calculations. This paper summarizes results of computer analyses and laboratory experiments and suggests a preliminary definition for the boundary of the disturbed zone for the unsaturated environment at Yucca Mountain. Although the intent of this paper is to define the boundary of the disturbed zone at the edge of significant changes in intrinsic hydrologic properties, there is no evidence of changes in intrinsic hydrologic properties that could significantly change the groundwater travel time from the repository to the water table. Such a result suggests that the disturbed zone at Yucca Mountain is of minimal extent. Because the analyses and experiments reviewed here indicate that there are a variety of changes near the waste package and because the results are subject to uncertainty, the preliminary suggestion for the extent of the disturbed zone is a value larger than the results themselves would suggest: the boundary is proposed to be a plane 10 m below the lower boundary of the waste packages. 88 refs., 12 figs., 5 tabs

  12. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  13. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  14. Preliminary project of s Thomson scattering system for the ETE tokamak

    International Nuclear Information System (INIS)

    Berni, Luiz Angelo

    1997-01-01

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light

  15. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  16. The CUORE/CUORICINO project: preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 420 kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.) The scale of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project are briefly discussed [ru

  17. The CUORE/CUORICINO project: Preliminary studies

    International Nuclear Information System (INIS)

    Brofferio, C.

    2000-01-01

    A 1-t bolometer detector, aiming at the search for neutrinoless double-beta decay, cold dark matter, and solar axions with extremely high sensitivity, has been proposed (CUORE project). At the moment, the construction of a 42-kg array of 56 TeO 2 bolometers (CUORICINO project) has been approved and is financed. CUORICINO will be a feasibility test for CUORE, while increasing the present sensitivity on 0νββ half-life of 130 Te (1 x 10 23 yr, 90% C.L.). The state of the art of CUORICINO, together with the physical motivations and the technical feasibility of the CUORE project, is briefly discussed

  18. 49 CFR 611.13 - Overall project ratings.

    Science.gov (United States)

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION... to enter into preliminary engineering, final design, or FFGAs. (c) These ratings will be used to: (1) approve advancement of a proposed project into preliminary engineering and final design; (2) Approve...

  19. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase of the proj......This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...

  20. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13089-002] Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... study the feasibility of the Conway Ranch Hydropower Project to be located on Virginia Creek, near the...

  1. 76 FR 19875 - Migratory Bird Hunting; Proposed 2011-12 Migratory Game Bird Hunting Regulations (Preliminary...

    Science.gov (United States)

    2011-04-08

    ..., carriage, or export of any * * * bird, or any part, nest, or egg'' of migratory game birds can take place... 50 CFR Part 20 Migratory Bird Hunting; Proposed 2011-12 Migratory Game Bird Hunting Regulations (Preliminary) With Requests for Indian Tribal Proposals and Requests for 2013 Spring and Summer Migratory Bird...

  2. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  3. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13995-000] Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 4, 2011, Mill Town Power Project filed an application for a...

  4. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  5. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  6. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  7. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  8. 77 FR 60424 - FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13484-001] FFP Project 73 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 4, 2012, FFP Project 73, LLC filed an application for a...

  9. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  10. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  11. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  12. Yucca Mountain transportation routes: Preliminary characterization and risk analysis

    International Nuclear Information System (INIS)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R.

    1991-01-01

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history

  13. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Science.gov (United States)

    2010-01-01

    ... time on submitted proposals until comparisons can be made with other existing projects or with project... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements...

  14. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  15. PRELIMINARY METHODOLOGICAL PROPOSAL FOR ESTIMATING ENVIRONMENTAL FLOWS IN PROJECTS APPROVED BY THE MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (MADS, COLOMBIA

    Directory of Open Access Journals (Sweden)

    Gabriel A. Pinilla Agudelo

    2014-01-01

    Full Text Available ABSTRACT A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogotá (UNC. The proposed method begins with an evaluation of hydrological criteria,continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macroinvertebrates, riparian vegetation, and fish. The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS. RESUMEN Se presenta una propuesta metodológica para estimar los caudales ambientales en grandes proyectos licenciados por la Agencia Nacional de Licencias Ambientales (ANLA de Colombia, resultado de un convenio interadministrativo suscrito entre el ahora Ministerio de Ambiente y Desarrollo Sostenible (MADS de Colombia y la Universidad Nacional de Colombia, Bogotá (UNC. El método propuesto parte de garantizar criterios hidrológicos, continúa con una validación hidráulica y de calidad del agua, sigue con la determinación de la integridad del hábitat, en un proceso iterativo que requiere evaluación para las condiciones antes y después de la construcción del proyecto y que permite establecer un caudal que, además de conservar las funciones ecológicas del río, garantiza los usos del recurso aguas abajo. Espec

  16. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  17. Ambient Assisted Living and ageing: preliminary results of RITA project.

    Science.gov (United States)

    Aquilano, Michela; Cavallo, Filippo; Bonaccorsi, Manuele; Esposito, Raffaele; Rovini, Erika; Filippi, Massimo; Esposito, Dario; Dario, Paolo; Carrozza, Maria Chiara

    2012-01-01

    The ageing of population is a social phenomenon that most of worldwide countries are facing. They are, and will be even more in the future, indeed trying to find solutions for improving quality of life of their elderly citizens. The project RITA wants to demonstrate that an update of the current socio-medical services with an Ambient Assisted Living (AAL) approach could improve the service efficiency and the quality of life of both elderly and caregiver. This paper presents the preliminary results obtained in RITA.

  18. Project Rulison: A preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, Miles Jr [Austral Oil Company Incorporated, Houston, TX (United States); Bray, Bruce G; Mann, Robert L [CER Geonuclear Corporation, Las Vegas, NV (United States)

    1970-05-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Rulison Field in Garfield County, Colorado. Since discovery in 1952, this reservoir has been tested by nine widely-spaced conventionally completed wells. A method of stimulation, far greater in magnitude and efficiency than conventional hydraulic fracturing, is needed to recover this gas at economic rates. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90-125 billion cubic feet per 640 acres from earlier wells, was confirmed from information obtained on two conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas flow computer model. A nuclear explosive with a design yield of 40 kilotons was emplaced in a 10-3/4 inch hole at a depth of 8426 feet below ground surface and detonated on September 10, 1969. A preliminary appraisal of the data taken at shot time indicate that the explosive behaved as predicted. The explosion was completely contained underground as predicted and no major seismic damage occurred. The post-shot drilling program, to reenter the chimney, will congruence in March 1970, approximately six months after detonation. A test program will be initiated at that time to determine the degree of reservoir stimulation achieved. (author)

  19. Preliminary corrosion models for BWIP [Basalt Waste Isolation Project] canister materials

    International Nuclear Information System (INIS)

    Fish, R.L.; Anantatmula, R.P.

    1983-01-01

    Waste package development for the Basalt Waste Isolation Project (BWIP) requires the generation of materials degradation data under repository relevant conditions. These data are used to develop predictive models for the behavior of each component of waste package. The component models are exercised in performance analyses to optimize the waste package design. This document presents all repository relevant canister materials corrosion data that the BWIP and others have developed to date, describes the methodology used to develop preliminary corrosion models and provides the mathematical description of the models for both low carbon steel and Fe9Cr1Mo steel. Example environment/temperature history and model application calculations are presented to aid in understanding the models. The models are preliminary in nature and will be updated as additional corrosion data become available. 6 refs., 5 tabs

  20. Proposal of the Use of a Fuzzy Stochastic Network for the Preliminary Evaluation of the Feasibility of the Process of the Adaptation of a Historical Building to a Particular Form of Use

    Science.gov (United States)

    Radziszewska-Zielina, Elżbieta; Śladowski, Grzegorz

    2017-10-01

    The knowledge of a real estate developer regarding the possibilities of adapting a historical building to a particular form of use and the knowledge of the approximate costs associated with this process are some of the more important pieces of information that can influence the making of the final decision regarding commencing with such a project. The preliminary analysis of the process of adapting a historical building is a difficult task due to the specific character of this type of project. The specific character of such a project is proven by the fact that the often insufficient analysis of the structure and architecture of a building and its historical substance at the stage of carrying out the process of adaptation can generate the necessity to perform previously unforeseen additional actions. An equally important problem is the difficulty in estimating the funds required to conduct research and the analyses associated with developing design documentation, as well as carrying out construction and conservation work. This is why a real estate developer should analyse various scenarios of carrying out a project during the stage of the preliminary analysis of its feasibility, taking into account the fact that some of them can occur in a random manner. The authors of the paper propose the use of one of the planning tools known as stochastic networks, which can be used to model the undetermined structure of these types of projects. Fuzzy logic was used in order to estimate uncertain values of the parameters of a model (the probability of performing work and paying the associated costs). The approach proposed by the authors was used to perform a preliminary analysis of the adaptation of the Arsenal in Gdańsk to a particular form of use along with estimating the costs associated with it. The results that were obtained have confirmed the potential of this method for real-world application.

  1. 75 FR 27143 - Migratory Bird Hunting; Proposed 2010-11 Migratory Game Bird Hunting Regulations (Preliminary...

    Science.gov (United States)

    2010-05-13

    ... Convention and the subsequent 1936 Mexico Convention for the Protection of Migratory Birds and Game Mammals... Part III Department of the Interior Fish and Wildlife Service 50 CFR Part 20 Migratory Bird Hunting; Proposed 2010-11 Migratory Game Bird Hunting Regulations (Preliminary) With Requests for Indian...

  2. Preliminary design report: Prototypical Spent Fuel Consolidation Equipment Demonstration Project: Phase 1

    International Nuclear Information System (INIS)

    Blissell, W.H.; Ciez, A.P.; Mitchell, J.L.; Winkler, C.J.

    1986-12-01

    This document describes the Westinghouse Preliminary Design for the Prototypical Consolidation Demonstration Project per Department of Energy (DOE) Contract No. DE-AC07-86ID12649 and under direction of the DOE Idaho Operations Office. The preliminary design is the first step to providing the Department of Energy with a fully qualified, licensable, cost-effective spent fuel rod consolidation system. The design was developed using proven technologies and equipment to create an innovative approach to previous rod consolidation concepts. These innovations will better enable the Westinghouse system to: consolidate fuel rods in a precise, fully-controlled, accountable manner; package all rods from two PWR fuel assemblies or from four BWR fuel assemblies in one 8.5 inch square consolidated rods canister; meet all functional requirements; operate with all fuel types common to the US commercial nuclear industry with minimal tooling changeouts; and meet consolidation production process rates, while maintaining operator and public health and safety. This Preliminary Design Report provides both detailed descriptions of the equipment required to perform the rod consolidation process and the supporting analyses to validate the design

  3. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  4. 77 FR 5506 - ORPC Maine, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-02-03

    ... preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Treat Island Tidal Energy Project to be located in Passamaquoddy Bay, between the Town of Eastport and Treat Island, Washington County, Maine. The sole purpose of a preliminary permit, if issued...

  5. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  6. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  7. A Proposal to Build an Education Research and Development Program: The Kamehameha Early Education Project Proposal. Technical Report #3.

    Science.gov (United States)

    Gallimore, Ronald; And Others

    This report summarizes the programmatic features of a proposal for the Kamehameha Early Education Project (KEEP), a program aimed at the development, demonstration, and dissemination of methods for improving the education of Hawaiian and part-Hawaiian children. A brief description of the proposed project goals, structure, organization, and…

  8. Preliminary design and thermal analysis of device for finish cooling Jaffa biscuits in a.d. 'Jaffa'- Crvenka

    Directory of Open Access Journals (Sweden)

    Salemović Duško R.

    2015-01-01

    Full Text Available In this paper preliminary design of device for finish cooling chocolate topping of biscuits in A.D. 'Jaffa'- Crvenka was done. The proposed preliminary design followed by the required technological process of finish cooling biscuits and required parameters of process which was supposed to get and which represented part of project task. Thermal analysis was made and obtained percentage error between surface contact of the air and chocolate topping, obtained from heat balance and geometrical over proposed preliminary design, wasn't more than 0.67%. This is a preliminary design completely justified because using required length of belt conveyor receive required temperature of chocolate topping at the end of the cooling process.

  9. 76 FR 50726 - Riverbank Hydro No. 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-08-16

    ... (FPA), proposing to study the feasibility of the Tuttle Creek Hydroelectric Project (Tuttle Creek Project or project) to be located at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam, on Big Blue River, near Manhattan, Riley County, Kansas. The sole purpose of a preliminary permit, if issued...

  10. Preliminary design of a coffee harvester

    Directory of Open Access Journals (Sweden)

    Raphael Magalhães Gomes Moreira

    2016-10-01

    Full Text Available Design of an agricultural machine is a highly complex process due to interactions between the operator, machine, and environment. Mountain coffee plantations constitute an economic sector that requires huge investments for the development of agricultural machinery to improve the harvesting and post-harvesting processes and to overcome the scarcity of work forces in the fields. The aim of this study was to develop a preliminary design for a virtual prototype of a coffee fruit harvester. In this study, a project methodology was applied and adapted for the development of the following steps: project planning, informational design, conceptual design, and preliminary design. The construction of a morphological matrix made it possible to obtain a list of different mechanisms with specific functions. The union between these mechanisms resulted in variants, which were weighed to attribute scores for each selected criterion. From each designated proposal, two variants with the best scores were selected and this permitted the preparation of the preliminary design of both variants. The archetype was divided in two parts, namely the hydraulically articulated arms and the harvesting system that consisted of the vibration mechanism and the detachment mechanism. The proposed innovation involves the use of parallel rods, which were fixed in a plane and rectangular metal sheet. In this step, dimensions including a maximum length of 4.7 m, a minimum length of 3.3 m, and a total height of 2.15 m were identified based on the functioning of the harvester in relation to the coupling point of the tractor.

  11. 78 FR 39829 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...: Title: Reporting of Nonpayroll Withheld Tax Liabilities. OMB Number: 1545-1413. Regulation Project...

  12. 78 FR 39830 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... the Ozone Layer and on Products Containing Such Chemicals. OMB Number: 1545-1153. Regulation Project...

  13. 78 FR 70100 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-22

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Nuclear Power Plant. OMB Number: 1545-1378. Regulation Project Number: TD 8580. Abstract: This regulation...

  14. 78 FR 76893 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments.... Regulation Project Number: REG-209626-93 (TD 8796). Abstract: These regulations provide guidance concerning...

  15. 78 FR 45614 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-29

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... GST Deemed Allocations. OMB Number: 1545-1892. Regulation Project Number: REG-153841-02 (TD 9208...

  16. 75 FR 2930 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-106446-98] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... From Joint and Several Liability. OMB Number: 1545-1719. Regulation Project Number: REG-106446-98...

  17. 76 FR 6153 - Supplemental Environmental Impact Statement for the Proposed Campo Regional Landfill Project on...

    Science.gov (United States)

    2011-02-03

    ... for the Proposed Campo Regional Landfill Project on the Campo Indian Reservation, San Diego County, CA... proposed Campo Regional Landfill Project (Proposed Action) to be located on the Campo Indian Reservation... Landfill Project (Proposed Action). There is no Federal action of amended lease and amended sublease...

  18. 75 FR 2932 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-116664-01] RIN 1545-BC15 Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION.... OMB Number: 1545-1868. Regulation Project Number: REG-116664-01 (TD 9300 (final)). Abstract: This...

  19. 78 FR 76892 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Liabilities for Pension Funding Purposes. OMB Number: 1545-2095. Regulation Project Number: REG-139236-07 (TD...

  20. 76 FR 74117 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-30

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Number: 1545-0817. Regulation Project Number: EE-28-78 (TD 7845). Abstract: Internal Revenue Code section...

  1. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  2. 78 FR 66424 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [IA-33-92] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... Project Number: IA-33-92. Abstract: Section 6050H of the Internal Revenue Code relates to the information...

  3. 78 FR 66423 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [TD 9057, TD 9154, TD 9187] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Rules. OMB Number: 1545-1774. Regulation Project Number: TD 9057, TD 9154, and TD 9187. Abstract: The...

  4. Proposed Casey's Pond Improvement Project, Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the impacts associated with the proposed Casey's Pond Improvement Project at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The improvement project would maximize the efficiency of the Fermilab Industrial Cooling Water (ICW) distribution system, which removes (via evaporation) the thermal load from experimental and other support equipment supporting the high energy physics program at Fermilab. The project would eliminate the risk of overheating during fixed target experiments, ensure that the Illinois Water Quality Standards are consistently achieved and provide needed additional water storage for fire protection. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required

  5. Preliminary Geological Survey on the Proposed Sites for the New Research Reactor

    International Nuclear Information System (INIS)

    Lim, In Cheol; Ha, J. J.; Oh, K. B.

    2010-12-01

    · Performing the preliminary geological survey on the proposed sites for the new research reactor through the technical service · Ordering a technical service from The Geological Society of Korea · Contents of the geological survey - Confirmation of active fault - Confirmation of a large-scale fracture zone or weak zone - Confirmation of inappropriate items related to the underground water - Confirmation of historical seismicity and instrumental earthquakes data · Synthesized analysis and holding a report meeting · Results of the geological survey - Confirmation of the geological characteristics of the sites and drawing the requirements for the precise geological survey in the future

  6. 75 FR 2127 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project Project, to be located on Saxtons River, in...

  7. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  8. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  9. ADS project in the Vinca Institute

    International Nuclear Information System (INIS)

    Pesic, M.; Neskovic, N.; Plecas, I.

    1999-01-01

    Among the six scientific programmes proposed for future research in the Vinca Institute, the nuclear one is connected to the nuclear reactors and waste management activities. One of the projects within the nuclear programme is associated to a proposal for designing a small modern subcritical research reactor driven by an accelerator beam. The idea of this Project is based on the facts that the construction of the Tesla accelerator installation is in the final phase and that a rich experience is gained in design, construction, operation and maintenance of both research reactors in the Institute in the last 40 years. Preliminary scope of the ADS project in the Vinca Institute, including some details and options, are given (author)

  10. Drinking-water hydropower installation at Schattdorf - Preliminary project; Trinkwasserkraftwerk Oberfeld Haldi bei Schattdorf. Programm Kleinwasserkraftwerke. Vorprojekt 2009

    Energy Technology Data Exchange (ETDEWEB)

    Gasser, M.

    2009-09-15

    This preliminary project report for the Swiss Federal Office of Energy (SFOE) describes the project for the construction of a small hydropower installation near Schattdorf, Switzerland. The location of the Faetsch springs and the ownership of the various land parcels involved are described. The general water supply project for Oberfeld-Haldi and the various springs and reservoirs involved are also discussed. The works necessary for the realisation of the hydropower project are described and discussed. Cost estimates are presented and the application for cost-covering remuneration of the scheme is noted. Estimates of energy production are presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also discussed.

  11. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  12. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  13. New construction of the Kelchbach hydropower installation - Preliminary project; Vorprojekt Neubau Kraftwerk Kelchbach. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Kalbermatten, J.

    2009-09-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes the preliminary project for the new construction of a small hydropower installation on the Kelchbach stream in Naters, Switzerland. After a pressure-pipe rupture, the old, over 100 year-old installation was closed down. The replacement installation is planned to increase power production. The works necessary for the realisation of this hydropower project are described and discussed. Several older studies on the replacement of the installation are listed. Three variants are presented and discussed as are hydrological data on the project. Cost estimates are presented and discussed. Estimates of energy production are also presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also examined.

  14. 75 FR 66083 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13723-000] Iron Mask Hydro..., Iron Mask Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Iron Mask Pumped Storage Project to be...

  15. EUBerry: Competitiveness and marketing strategies of sustainable berries validated for improved health benefits - Introduction to the project and preliminary results

    NARCIS (Netherlands)

    Groot, M.J.; Roelofs, P.F.M.M.; Kaim, E.; Sijtsema, S.J.; Zimmermann, K.L.; Zmarlicki, K.

    2014-01-01

    The EUBerry project is not only building on technical research but also studies berry production and consumption from a social sciences perspective. This paper aims to describe the approach used in the EUBerry project about business economics as well as marketing. In addition some preliminary

  16. Developing an online support tool to assist students in higher education with project proposals

    OpenAIRE

    Haji Suhaili, Wida Susanty

    2015-01-01

    The research presented in this thesis investigates ways to assist students with writing their project proposals. There is limited literature on the problems students have when writing project proposals in Higher Education. Particularly most of the literature has concentrated on the writing aspects, rhetorical aspects and structure of a scientific article. Even though various studies on assessment of undergraduate individual and group project works have been done, the project pr...

  17. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  18. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  19. Proposed REDD+ project for the Sundarbans: Legal and institutional issues

    Directory of Open Access Journals (Sweden)

    Saiful Karim

    2013-07-01

    Full Text Available Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM Sundarbans Project’ (CRISP to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

  20. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  1. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  2. An assessment strategy for proposals of engineering projects in the Bachelor of Biomedical Engineering Curriculum at Universidad Autónoma Metropolitana-Iztapalapa.

    Science.gov (United States)

    Castañeda-Villa, N; Jiménez-González, A; Ortiz-Posadas, M R

    2015-08-01

    Since 1974, the Bachelor of Biomedical Engineering Program (BBME) is offered at Universidad Autónoma Metropolitana-Iztapalapa, in Mexico City. By design, it must be completed in four years (12 trimesters) and, in the latter three, the senior students work on a BME project, which is done by completing three modules: Project Seminar (PS), Project on BME I and Project on BME II. In the PS module, the student must find a problem of interest in the BME field and suggest a solution through the development of an Engineering Project Proposal (EPP). Currently, the module is being taught by two faculty members of the BBME, who instruct students on how to develop their EPPs and evaluate their progress by reviewing a number of EPPs during the trimester. This generates a huge workload for the module instructors, which makes it necessary to involve more faculty members trimester-to-trimester (i.e. every 12 weeks) and, therefore, to create a set of systematic guidelines that ease the evaluation process for new instructors. Hence, the purpose of this paper is to present an assessment strategy (in the form of an assessment matrix) for the PS module as well as some preliminary results after two trimesters of its implementation.

  3. Citizens' views about the proposed Hartsville Nuclear Power Plant: a preliminary report of potential social impacts

    International Nuclear Information System (INIS)

    Schuller, C.R.; Fowler, J.R.; Mattingly, T.J. Jr.; Sundstrom, E.; Lounsbury, J.; Passino, E.M.; Dowell, D.A.; Hutton, B.J.

    1975-05-01

    Preliminary results of a survey of public attitudes toward a proposed nuclear power plant facility at Hartsville, Tennessee are summarized. The purpose of the study was to aid in developing better methods for understanding the social consequences of energy facility development. The report is based on data obtained in interviews with 350 randomly selected respondents administered in Trousdale County, Tennessee during February 1975. (U.S.)

  4. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  5. 77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-02-08

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  6. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  7. 76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-09-30

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...

  8. 76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-04-07

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  9. 76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-11-25

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  10. Preliminary sensitivity analyses of corrosion models for BWIP [Basalt Waste Isolation Project] container materials

    International Nuclear Information System (INIS)

    Anantatmula, R.P.

    1984-01-01

    A preliminary sensitivity analysis was performed for the corrosion models developed for Basalt Waste Isolation Project container materials. The models describe corrosion behavior of the candidate container materials (low carbon steel and Fe9Cr1Mo), in various environments that are expected in the vicinity of the waste package, by separate equations. The present sensitivity analysis yields an uncertainty in total uniform corrosion on the basis of assumed uncertainties in the parameters comprising the corrosion equations. Based on the sample scenario and the preliminary corrosion models, the uncertainty in total uniform corrosion of low carbon steel and Fe9Cr1Mo for the 1000 yr containment period are 20% and 15%, respectively. For containment periods ≥ 1000 yr, the uncertainty in corrosion during the post-closure aqueous periods controls the uncertainty in total uniform corrosion for both low carbon steel and Fe9Cr1Mo. The key parameters controlling the corrosion behavior of candidate container materials are temperature, radiation, groundwater species, etc. Tests are planned in the Basalt Waste Isolation Project containment materials test program to determine in detail the sensitivity of corrosion to these parameters. We also plan to expand the sensitivity analysis to include sensitivity coefficients and other parameters in future studies. 6 refs., 3 figs., 9 tabs

  11. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  12. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  13. 76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-05-05

    ... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...

  14. 78 FR 35961 - Pilot Project for Tribal Jurisdiction Over Crimes of Domestic Violence

    Science.gov (United States)

    2013-06-14

    ...This notice proposes procedures for an Indian tribe to request designation as a participating tribe under section 204 of the Indian Civil Rights Act of 1968, as amended, on an accelerated basis, pursuant to the voluntary pilot project described in section 908(b)(2) of the Violence Against Women Reauthorization Act of 2013 (``the Pilot Project''), and also proposes procedures for the Attorney General to act on such a request. This notice also invites public comment on the proposed procedures and solicits preliminary expressions of interest from tribes that may wish to participate in the Pilot Project.

  15. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ...] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The..., will conduct a random drawing to determine the filing priority of the applicants identified in this... regulations.\\2\\ The priority established by this drawing will be used to determine which applicant, among...

  16. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  17. Sludge Treatment Project Engineered Container Retrieval And Transfer System Preliminary Design Hazard Analysis Supplement 1

    International Nuclear Information System (INIS)

    Franz, G.R.; Meichle, R.H.

    2011-01-01

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  18. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  19. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  20. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  1. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  2. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  3. 76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-18

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...

  4. 75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-03-19

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  5. 77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-01-04

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  6. 75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-11-22

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...

  7. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ...+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  8. Landscape ecological impact of climatic change some preliminary findings of the LICC Project

    International Nuclear Information System (INIS)

    Boer, M.M.

    1991-01-01

    The main objectives of the LICC project are to address the potential effects of a future climatic change on (semi-) natural terrestrial ecosystems and landscapes in Europe; six case studies are covered: alpine regions, boreal and subartic regions, Mediterranean region, fluvial systems, wetlands and coastal dunes. Preliminary findings showed a serious lack in fundamental ecological knowledge. Assessment of potential effects involved changes in water and sediment fluxes, changes in the vegetation cover, species response, dispersal and migration in a fragmented landscape and modification of climate impacts by man

  9. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  10. Preliminary report on the Pacific Gas and Electric Company's notice of intention to seek certification for Geysers Unit 16 (78-NOI-6)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The preliminary findings of fact and conclusion adopted by the Commission Committee are presented. Also, a description of the proposed project, a summary of the proceedings to date, and local, state, and federal government agency comments on the proposal are included. Preliminary findings and conclusions are presented on: (a) conformity to the forecast of statewide and service area electric power demands; (b) the degree to which the proposed site and facility conform with applicable local, regional, state, and federal standards, ordinances and laws; (c) the safety and reliability of the facility; and (d) the relative merit of the proposed transmission line corridors. (MHR)

  11. Preliminary report on the Department of Water Resources Notice of Intention to file an application for certification of DWR Bottle Rock, 78-NOI-7

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The preliminary findings of fact and conclusion adopted by the Commission Committee are presented. Also, a description of the proposed project, a summary of the proceedings to date, and local, state, and federal government agency comments on the proposal are included. Preliminary findings and conclusions are presented on: (a) conformity to the forecast of statewide and service area electric power demands; (b) the degree to which the proposed site and facility conform with applicable local, regional, state, and federal standards, ordinances and laws; (c) the safety and reliability of the facility; and (d) the relative merit of the proposed transmission line corridors. (MHR)

  12. Yucca Mountain transportation routes: Preliminary characterization and risk analysis; Volume 2, Figures [and] Volume 3, Technical Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Souleyrette, R.R. II; Sathisan, S.K.; di Bartolo, R. [Nevada Univ., Las Vegas, NV (United States). Transportation Research Center

    1991-05-31

    This report presents appendices related to the preliminary assessment and risk analysis for high-level radioactive waste transportation routes to the proposed Yucca Mountain Project repository. Information includes data on population density, traffic volume, ecologically sensitive areas, and accident history.

  13. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  14. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  15. 76 FR 43381 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-07-20

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Financial Asset Securitization Investment Trusts; Real Estate Mortgage Investment Conduits (TD 9004 (final...

  16. 75 FR 78236 - Pennamaquan Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-12-15

    ... Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2010. On November 22, 2010, Pennamaquan Tidal... Act (FPA), proposing to study the feasibility of the Pennamaquan Tidal Power Plant Project to be...

  17. Project Overview: Cumulus Humilis Aerosol Processing Study (CHAPS): Proposed Summer 2007 ASP Field Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Berkowitz, Carl M.; Berg, Larry K.; Ogren, J. A.; Hostetler, Chris A.; Ferrare, Richard

    2006-05-18

    This white paper presents the scientific motivation and preliminary logistical plans for a proposed ASP field campaign to be carried out in the summer of 2007. The primary objective of this campaign is to use the DOE Gulfstream-1 aircraft to make measurements characterizing the chemical, physical and optical properties of aerosols below, within and above large fields of fair weather cumulus and to use the NASA Langley Research Center’s High Spectral Resolution Lidar (HSRL) to make independent measurements of aerosol backscatter and extinction profiles in the vicinity of these fields. Separate from the science questions to be addressed by these observations will be information to add in the development of a parameterized cumulus scheme capable of including multiple cloud fields within a regional or global scale model. We will also be able to compare and contrast the cloud and aerosol properties within and outside the Oklahoma City plume to study aerosol processes within individual clouds. Preliminary discussions with the Cloud and Land Surface Interaction Campaign (CLASIC) science team have identified overlap between the science questions posed for the CLASIC Intensive Operation Period (IOP) and the proposed ASP campaign, suggesting collaboration would benefit both teams.

  18. 78 FR 23975 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-23

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... definition of a controlled foreign corporation, foreign base company income and foreign personal holding...

  19. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  20. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Science.gov (United States)

    2010-05-04

    ... Proposed Cape Wind Energy Project in Nantucket Sound, Offshore Massachusetts AGENCY: Minerals Management... Energy Project proposed for Nantucket Sound, offshore Massachusetts. On January 16, 2009, the MMS... construct a wind power facility on Horseshoe Shoal in Nantucket Sound, offshore Massachusetts. Following the...

  1. QMM Project. A proposal for field map measurement of the six HRS Quadrupoles in Hall A, CEBAF

    International Nuclear Information System (INIS)

    Fonvieille, H.; Quemener, G.; Vernin, P.

    1993-12-01

    The proposed measurements of the magnetic field maps of the six HRS quadrupoles in Hall A at CEBAF is summarized. The basis of the measurement using rotating coils and a preliminary design of the apparatus are presented. (author)

  2. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  3. 78 FR 26694 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of the Treasury, as part of its continuing effort to reduce paperwork and...

  4. 75 FR 2128 - Basin Farm Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-01-14

    ... Renewable, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Renewable, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Basin Farm Renewable Energy Project, to be located on Saxtons River, in...

  5. 75 FR 28331 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-05-20

    ... that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service [INTL-955-86] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and...

  6. 78 FR 28703 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-15

    ... requirements that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...

  7. Small hydropower station in Lavin - Preliminary study

    International Nuclear Information System (INIS)

    Merz, F.

    2008-05-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study regarding a proposed small hydropower installation on the alpine river Lavinuoz in Lavin, Switzerland. The geographical situation with mountains and glaciers in the catchment area of the proposed hydropower installation is discussed as are the appropriate water catchment installations. Possible dangers caused by avalanches and rock fall are examined. The power to be produced - 5,500,000 kWh/y - by the turbine which is nominally rated at 1350 kW is discussed, as are estimates of production costs. Figures on the investments required and the economic feasibility of the project are discussed, as are environmental factors that are to be taken into account.

  8. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  9. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  10. 76 FR 4150 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation project will be barred unless the claim is filed on or before July 25, 2011. FOR...

  11. 76 FR 55470 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-09-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or...

  12. Episodic Laryngeal Breathing Disorders: Literature Review and Proposal of Preliminary Theoretical Framework.

    Science.gov (United States)

    Shembel, Adrianna C; Sandage, Mary J; Verdolini Abbott, Katherine

    2017-01-01

    The purposes of this literature review were (1) to identify and assess frameworks for clinical characterization of episodic laryngeal breathing disorders (ELBD) and their subtypes, (2) to integrate concepts from these frameworks into a novel theoretical paradigm, and (3) to provide a preliminary algorithm to classify clinical features of ELBD for future study of its clinical manifestations and underlying pathophysiological mechanisms. This is a literature review. Peer-reviewed literature from 1983 to 2015 pertaining to models for ELBD was searched using Pubmed, Ovid, Proquest, Cochrane Database of Systematic Reviews, and Google Scholar. Theoretical models for ELBD were identified, evaluated, and integrated into a novel comprehensive framework. Consensus across three salient models provided a working definition and inclusionary criteria for ELBD within the new framework. Inconsistencies and discrepancies within the models provided an analytic platform for future research. Comparison among three conceptual models-(1) Irritable larynx syndrome, (2) Dichotomous triggers, and (3) Periodic occurrence of laryngeal obstruction-showed that the models uniformly consider ELBD to involve episodic laryngeal obstruction causing dyspnea. The models differed in their description of source of dyspnea, in their inclusion of corollary behaviors, in their inclusion of other laryngeal-based behaviors (eg, cough), and types of triggers. The proposed integrated theoretical framework for ELBD provides a preliminary systematic platform for the identification of key clinical feature patterns indicative of ELBD and associated clinical subgroups. This algorithmic paradigm should evolve with better understanding of this spectrum of disorders and its underlying pathophysiological mechanisms. Copyright © 2017 The Voice Foundation. Published by Elsevier Inc. All rights reserved.

  13. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    International Nuclear Information System (INIS)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations

  14. 1972 preliminary safety analysis report based on a conceptual design of a proposed repository in Kansas

    Energy Technology Data Exchange (ETDEWEB)

    Blomeke, J.O.

    1977-08-01

    This preliminary safety analysis report is based on a proposed Federal Repository at Lyons, Kansas, for receiving, handling, and depositing radioactive solid wastes in bedded salt during the remainder of this century. The safety analysis applies to a hypothetical site in central Kansas identical to the Lyons site, except that it is free of nearby salt solution-mining operations and bore holes that cannot be plugged to Repository specifications. This PSAR contains much information that also appears in the conceptual design report. Much of the geological-hydrological information was gathered in the Lyons area. This report is organized in 16 sections: considerations leading to the proposed Repository, design requirements and criteria, a description of the Lyons site and its environs, land improvements, support facilities, utilities, different impacts of Repository operations, safety analysis, design confirmation program, operational management, requirements for eventually decommissioning the facility, design criteria for protection from severe natural events, and the proposed program of experimental investigations. (DLC)

  15. Linear accelerator-breeder (LAB): a preliminary analysis and proposal

    International Nuclear Information System (INIS)

    1976-01-01

    The development and demonstration of a Linear Accelerator-Breeder (LAB) is proposed. This would be a machine which would use a powerful linear accelerator to produce an intense beam of protons or deuterons impinging on a target of a heavy element, to produce spallation neutrons. These neutrons would in turn be absorbed in fertile 238 U or 232 Th to produce fissile 239 Pu or 233 U. Though a Linear Accelerator-Breeder is not visualized as competitive to a fast breeder such as the LMFBR, it would offer definite benefits in improved flexibility of options, and it could probably be developed more rapidly than the LMFBR if fuel cycle problems made this desirable. It is estimated that at a beam power of 300 MW a Linear Accelerator-Breeder could produce about 1100 kg/year of fissile 239 Pu or 233 U, which would be adequate to fuel from 2,650 to 15,000 MW(e) of fission reactor capacity depending on the fuel cycle used. A two-year design study is proposed, and various cost estimates are presented. The concept of the Linear Accelerator-Breeder is not new, having been the basis for a major AEC project (MTA) a number of years ago. It has also been pursued in Canada starting from the proposal for an Intense Neutron Generator (ING) several years ago. The technical basis for a reasonable design has only recently been achieved. The concept offers an opportunity to fill an important gap that may develop between the short-term and long-term energy options for energy security of the nation

  16. Preliminary mapping of surficial geology of Midway Valley Yucca Mountain Project, Nye County, Nevada

    International Nuclear Information System (INIS)

    Wesling, J.R.; Bullard, T.F.; Swan, F.H.; Perman, R.C.; Angell, M.M.; Gibson, J.D.

    1992-04-01

    The tectonics program for the proposed high-level nuclear waste repository at Yucca Mountain in southwestern Nevada must evaluate the potential for surface faulting beneath the prospective surface facilities. To help meet this goal, Quaternary surficial mapping studies and photolineament analyses were conducted to provide data for evaluating the location, recency, and style of faulting with Midway Valley at the eastern base of Yucca Mountain, the preferred location of these surface facilities. This interim report presents the preliminary results of this work

  17. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Science.gov (United States)

    2010-03-08

    ... Proposed Cape Wind Energy Project in Nantucket Sound, MA AGENCY: Minerals Management Service (MMS... MMS for the Cape Wind Energy Project proposed for Nantucket Sound, Massachusetts. On January 16, 2009... facility on Horseshoe Shoal in Nantucket Sound, Massachusetts. Following the adoption of the Energy Policy...

  18. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.; Hakiki, Farizal; Syihab, Z.; Ambia, F.; Yasutra, A.; Sutopo, S.; Efendi, M.; Sitompul, V.; Primasari, I.; Apriandi, R.

    2017-01-01

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  19. Revisiting EOR Projects in Indonesia through Integrated Study: EOR Screening, Predictive Model, and Optimisation

    KAUST Repository

    Hartono, A. D.

    2017-10-17

    EOR preliminary analysis is pivotal to be performed at early stage of assessment in order to elucidate EOR feasibility. This study proposes an in-depth analysis toolkit for EOR preliminary evaluation. The toolkit incorporates EOR screening, predictive, economic, risk analysis and optimisation modules. The screening module introduces algorithms which assimilates statistical and engineering notions into consideration. The United States Department of Energy (U.S. DOE) predictive models were implemented in the predictive module. The economic module is available to assess project attractiveness, while Monte Carlo Simulation is applied to quantify risk and uncertainty of the evaluated project. Optimization scenario of EOR practice can be evaluated using the optimisation module, in which stochastic methods of Genetic Algorithms (GA), Particle Swarm Optimization (PSO) and Evolutionary Strategy (ES) were applied in the algorithms. The modules were combined into an integrated package of EOR preliminary assessment. Finally, we utilised the toolkit to evaluate several Indonesian oil fields for EOR evaluation (past projects) and feasibility (future projects). The attempt was able to update the previous consideration regarding EOR attractiveness and open new opportunity for EOR implementation in Indonesia.

  20. 75 FR 37780 - Proposed Waivers and Extensions of Project Periods: Presidential Academies and Congressional...

    Science.gov (United States)

    2010-06-30

    ... the teaching of history. We seek this waiver and extension of project period in order to enable each... or the teaching of history. The Secretary certifies that the proposed waiver and extension of project... American History and Civics Education, and 34 CFR 75.261(c)(2), as it applies to the project funded under...

  1. 76 FR 28025 - East Maui Pumped Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for...

    Science.gov (United States)

    2011-05-13

    ... Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Act (FPA), proposing to study the feasibility of the East Maui Pumped Storage Water Supply Project to.... Bart M. O'Keeffe, East Maui Pumped Storage Water Supply LLC; P.O. Box 1916; Discovery Bay, CA 94505...

  2. The Proposal of Scaling the Roles in Scrum of Scrums for Distributed Large Projects

    OpenAIRE

    Abeer M. AlMutairi; M. Rizwan Jameel Qureshi

    2015-01-01

    Scrum of scrums is an approach used to scale the traditional Scrum methodology to fit for the development of complex and large projects. However, scaling the roles of scrum members brought new challenges especially in distributed and large software projects. This paper describes in details the roles of each scrum member in scrum of scrum to propose a solution to use a dedicated product owner for a team and inclusion of sub-backlog. The main goal of the proposed solution i...

  3. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  4. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  5. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  6. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  7. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  8. Lower Red River Meadow Stream Restoration Project

    International Nuclear Information System (INIS)

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  9. 77 FR 790 - Grant Lake Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2012-01-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13212-002] Grant Lake.... The proposed project would consist of: (1) Either (a) a 2-foot-high by 120-foot-long, concrete gravity... project reservoir, with a total storage capacity of 15,900 acre-feet and a water surface area of 1,790...

  10. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  11. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  12. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  13. The SNS target station preliminary Title I shielding analyses

    International Nuclear Information System (INIS)

    Johnson, J.O.; Santoro, R.T.; Lillie, R.A.; Barnes, J.M.; McNeilly, G.S.

    2000-01-01

    The Department of Energy (DOE) has given the Spallation Neutron Source (SNS) project approval to begin Title I design of the proposed facility to be built at Oak Ridge National Laboratory (ORNL). During the conceptual design phase of the SNS project, the target station bulk-biological shield was characterized and the activation of the major targets station components was calculated. Shielding requirements were assessed with respect to weight, space, and dose-rate constraints for operating, shut-down, and accident conditions utilizing the SNS shield design criteria, DOE Order 5480.25, and requirements specified in 10 CFR 835. Since completion of the conceptual design phase, there have been major design changes to the target station as a result of the initial shielding and activation analyses, modifications brought about due to engineering concerns, and feedback from numerous external review committees. These design changes have impacted the results of the conceptual design analyses, and consequently, have required a re-investigation of the new design. Furthermore, the conceptual design shielding analysis did not address many of the details associated with the engineering design of the target station. In this paper, some of the proposed SNS target station preliminary Title I shielding design analyses will be presented. The SNS facility (with emphasis on the target station), shielding design requirements, calculational strategy, and source terms used in the analyses will be described. Preliminary results and conclusions, along with recommendations for additional analyses, will also be presented. (author)

  14. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  15. Uses of geothermal energy in Jordan for heating greenhouses; project proposal

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.; Masarwah, Rober; Elkarmi, Fawwaz

    1993-08-01

    A proposal for the exploration of geothermal energy in Jordan for heating greenhouses. The report gives some background information on geothermal anomalies in Jordan, and outlines some on-going uses of geothermal energy in various parts of Jordan. The proposal is modelled on the 2664 square meter Filclair Super 9 Multispan greenhouse from France. The overall cost of the project involves three variables, the cost of the borehole, the cost of the greenhouse, and the cost of engineering services. The total cost ranges between three to four million dollars depending on the quantity and quality of information to be collected from the borehole. The advantages of geothermal heating compared with oil heating are emphasized. The project will enable geothermal heating and horticultural production to be monitored throughout the year, will produce data enabling rational and reliable water resources management, and will produce environmentally clean and efficient energy. (A.M.H.). 1 tab. 1 map

  16. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  17. The proposed Diagnostic Instrumentation and Analysis Laboratory, Mississippi State University

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The Department of Energy (DOE) proposes to authorize Mississippi State University (MSU) to proceed with the detailed design, construction and equipping of the proposed Diagnostic Instrumentation and Analysis Laboratory (DIAL). DOE grant funds are available to the University for the limited purpose of performing preliminary studies, including analysis necessary to conduct this environmental assessment. The proposed facility would be located in the Mississippi Research and Technology Park, adjacent to the Mississippi Agriculture and Forestry Experiment Station campus in Starkville, Mississippi. Total project cost is estimated at $7,953,600. This proposed laboratory would be designed to conduct research into combustion devices related to waste management and environmental restoration that is of importance to industry and government. The proposed facility`s role would be to develop diagnostic instrumentation capabilities in the area of combustion and related processes.

  18. Small-scale hydro power in the Anniviers Valley. Project Ayer-Nava. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Ayer-Nava. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant near Ayer, a village in the Anniviers Valley (Swiss Alps). Water from the Nava, a steep mountain river, should be lead into a hydraulic scheme for power generation. A hydraulic head of 400 to 550 m is available, depending on the variant considered. The corresponding expected mechanical power is 0.9 to 1.1 MW. For the most promising variant a preliminary project is described (peak electric power: 0.91 MW, annual electrical energy production: 3.1 GWh). The local geology and hydrogeology are presented. The water collection points, conduits and the power station are described. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  19. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  20. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    International Nuclear Information System (INIS)

    Fenham, J.

    2003-01-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 . The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF 6 -emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from solvent use and other sources is included

  1. The MACHO Project: Preliminary Results from 4 years of SMC observations.

    Science.gov (United States)

    Vandehei, T.; Griest, K.; Lehner, M.; Alcock, C.; Alves, D.; Cook, K.; Marshall, S.; Minniti, D.; Allsman, R.; Axelrod, T.; Freeman, K.; Peterson, B.; Rodgers, A.; Pratt, M.; Becker, A.; Stubbs, C.; Tomaney, A.; Bennett, D.; Quinn, P.; Sutherland, W.; Welch, D.

    1997-12-01

    The MACHO project is a search for dark matter in the form of massive compact halo objects(MACHOs). The project has photometrically monitored tens of millions of stars in the Large Magellanic Cloud (LMC), Small Magellanic Cloud (SMC), and Galactic bulge in search of rare gravitational microlensing events caused by these otherwise invisible objects. Microlensing toward the LMC has allowed powerful statements to be made about the dark population in the halo of our Galaxy, indicating that the MACHO halo fraction could be as high as f=0.5 with a most probable MACHO mass being ~ 0.5Msun. However, to date the LMC has been the only line of sight out of our Galaxy's halo. Clearly, another line of sight would provide a consistency check on these results, as well as another contraint on models of the halo, in particular on halo flattening. The SMC affords us this second line of sight. Here we give a status report on our upcoming 4 year results toward the SMC. We present the results of a preliminary analysis on over 2.2 million stars from 3 square degrees and discuss the implications for the dark matter in the halo of our Galaxy. A detailed analysis of the microlensing candidates toward the SMC, with blending and parallax fits, will be shown. This work is dedicated to the memory of Alex Rodgers.

  2. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  3. 78 FR 26112 - Limitation on Claims Against Proposed Public Transportation Projects; Correction

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects; Correction AGENCY: Federal Transit Administration (FTA), DOT. ACTION... Register on April 22, 2013, concerning a limitation on claims for certain specified public transportation...

  4. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  5. FY 1980 Report on results of research and development project, commissioned by Sunshine Project. Researches on R and D of management procedures; 1980 nendo kenkyu kaihatsu kanri shuho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    The strategic system planning procedures have been developed and applied for drafting R and D targets and subsequent medium-term plans, in order to help promote the Sunshine Project smoothly, based on the long-term prospects. This project compares the developed procedures with the current promotion systems and R and D management supporting procedures, to establish the strategic system planning procedures. These newly developed procedures are expected to accelerate the Sunshine Project, when applied in the standard manner. They are also partly applied to coal liquefaction techniques for (system demand analysis), the results of which are used to propose the ideal R and D targets of these techniques. The milestone planning procedures are preliminary applied to (establishing the project plans), to draw systematic long-, medium- and short-term plans. The preliminary application of these prediction/analysis and supporting procedures has verified effectiveness of the strategic system planning procedures. (NEDO)

  6. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  7. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  8. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    1987-01-01

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  9. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  10. Competitive strategy for the proposed Texas high speed rail project : a system dynamics/ CLIOS process approach.

    Science.gov (United States)

    2017-09-10

    The Texas High-Speed Rail (HSR) is an unprecedented US project proposed by a private company. This project has many uncertainties because it will be funded only by the private sectors and it is the first US HSR project using foreign technology. The H...

  11. Preliminaries to a feasibility analysis of the Maglev proposal of the Southern California Association of Governments for the region : a seed grant study report

    Science.gov (United States)

    2009-08-30

    This is a seed grant study to perform a preliminary investigation of the system components and : generalized costs of the magnetic levitation type of high speed rail system that is proposed for the : Southern California Region, TGVbased high speed...

  12. Preliminary estimates of cost savings for defense high level waste vitrification options

    International Nuclear Information System (INIS)

    Merrill, R.A.; Chapman, C.C.

    1993-09-01

    The potential for realizing cost savings in the disposal of defense high-level waste through process and design modificatins has been considered. Proposed modifications range from simple changes in the canister design to development of an advanced melter capable of processing glass with a higher waste loading. Preliminary calculations estimate the total disposal cost (not including capital or operating costs) for defense high-level waste to be about $7.9 billion dollars for the reference conditions described in this paper, while projected savings resulting from the proposed process and design changes could reduce the disposal cost of defense high-level waste by up to $5.2 billion

  13. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  14. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  15. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  16. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  17. Preliminary radiation transport analysis for the proposed National Spallation Neutron Source (NSNS)

    International Nuclear Information System (INIS)

    Johnson, J.O.; Lillie, R.A.

    1997-01-01

    The use of neutrons in science and industry has increased continuously during the past 50 years with applications now widely used in physics, chemistry, biology, engineering, and medicine. Within this history, the relative merits of using pulsed accelerator spallation sources versus reactors for neutron sources as the preferred option for the future. To address this future need, the Department of Energy (DOE) has initiated a pre-conceptual design study for the National Spallation Neutron Source (NSNS) and given preliminary approval for the proposed facility to be built at Oak Ridge National Laboratory (ORNL). The DOE directive is to design and build a short pulse spallation source in the 1 MS power range with sufficient design flexibility that it can be upgraded and operated at a significantly higher power at a later stage. The pre-conceptualized design of the NSNS initially consists of an accelerator system capable of delivering a 1 to 2 GeV proton beam with 1 MW of beam power in an approximate 0.5 microsecond pulse at a 60 Hz frequency onto a single target station. The NSNS will be upgraded in stages to a 5 MW facility with two target stations (a high power station operating at 60 Hz and a low power station operating at 10 Hz). Each target station will contain four moderators (combinations of cryogenic and ambient temperature) and 18 beam liens for a total of 36 experiment stations. This paper summarizes the radiation transport analysis strategies for the proposed NSNS facility

  18. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  19. Small hydropower station in Lavin - Preliminary study; Kleinwasserkraftwerk Lavin - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Merz, F.

    2008-05-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary study regarding a proposed small hydropower installation on the alpine river Lavinuoz in Lavin, Switzerland. The geographical situation with mountains and glaciers in the catchment area of the proposed hydropower installation is discussed as are the appropriate water catchment installations. Possible dangers caused by avalanches and rock fall are examined. The power to be produced - 5,500,000 kWh/y - by the turbine which is nominally rated at 1350 kW is discussed, as are estimates of production costs. Figures on the investments required and the economic feasibility of the project are discussed, as are environmental factors that are to be taken into account.

  20. STRATEGIC MAPS AND CRITICAL FACTORS FOR PROJECT MANAGEMENT MATURITY: A PROPOSAL

    Directory of Open Access Journals (Sweden)

    Sady Darcy Silva Junior

    2010-06-01

    Full Text Available Project Management (PM and Strategic Management (SM are two subjects of growing importance in the corporate environment which are normally considered in isolation. One way of integrating these two concepts might be via the concept of project management maturity (Westphal et al., 2008. Rabechini and Pessoa (2005 state that to obtain project management maturity, it is necessary to achieve success in a number of critical factors which include organizational culture and structure, as well as sponsorship at both tactical and strategic levels (Silva et al., 2008. Another way of achieving this connection is by using Balanced Scorecard (BSC as an auxiliary tool to integrate between projects and organizational strategy (Brock et al., 2003. The original developers of the BSC, Kaplan e Norton, subsequently developed the concept of strategy mapping, which they affirm "represents the missing link between the formulation and the execution of the strategy" (Kaplan e Norton, 2004. This paper proposes a strategy map identifying critical factors for attaining project management maturity. To formulate the map, we used a qualitative, exploratory approach oriented by Project Management theory and strategy mapping. We first identified 13 critical factors, then developed a strategy map, which was evaluated by six specialists (three in SM area and three in PM area.The results suggest links between strategic mapping nad critical factors in project management. It also contributes to both areas independently. Specifically, the study identifies critical factors for project management maturity while demonstrating the applicability of strategic mapping techniques to Balanced Scorecard concepts.

  1. Proposal for the further development of the 'Ribeira Grande' agricultural geothermal project

    International Nuclear Information System (INIS)

    Popovski, Kiril; De Medeiros, Jorge Rosa; Rodrigues, Ana Catarina Tavares

    2000-01-01

    Geothermal project Ribeira Grande has been the first trial to introduce the possibilities of direct application of geothermal energy at Azores. As all the first experiences, it's development has been escorted with a list of difficulties and problems, resulting with non proper completion of some systems and installations. However, even not complete, the reached results justified both technically and economically the indigenous resource door for further activities and development. Presented proposal for the second phase of project development consists two very important advantages: 1) Enables development of new demonstration and productive projects, without engaging new import of fuels or other energents; 2) Enables development based on the already existing economy sectors at the islands and makes them more profitable and accommodated to the requests of the national and international market. However, influencing national and international preconditions for the realization of the proposed activities are not very convenient and are requesting a concentrate engagement of the Institute for Innovative Technologies of Azores INOVA during the period of next 5 years. The final success of this engagement shall open very wide possibilities for direct application of geothermal energy development in this isolated EC community, presently mainly orientated towards import both of energy and food. (Authors)

  2. Carbon stocks in Norwegian forested systems. Preliminary data

    Directory of Open Access Journals (Sweden)

    Oyen BH.

    2000-01-01

    Full Text Available Between 1990 and 2010 the projected emissions of greenhouse gases in Norway is assumed to increase 24%. As a signatory to the Kyoto Protocol, Norway is supposed to limit the greenhouse gas emissions in the period 2008–2012 to 1% above the 1990 level. Potentially, forestry activities may contribute as a means to achieve the set target of emission reductions. The initial Norwegian views and proposals for definitions and accounting framework for activities under Articles 3.3 and 3.4 of the Kyoto Protocol was reported to the UNFCCC August 1 2000 by the Norwegian Ministry of Environment. There was also an annex to the submission with preliminary data and information on Articles 3.3 and 3.4 of the Kyoto Protocol. This paper is based on this annex, and focuses mainly on data for forests and other woodlands. Preliminary data indicate that approximately 85% of the carbon (C pool of forested systems is found in the soil. The major part of the annual C sequestration takes place in living biomass and soil, while sequestration in wood products and landfills etc. has been found to be of minor importance. It must be noted that the reported data are preliminary and contain large uncertainties.

  3. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  4. Preliminary benefit-cost analysis of the Fast Flux Test Facility (FFTF) power addition

    International Nuclear Information System (INIS)

    Callaway, J.M.; Lezberg, A.J.; Scott, M.J.; Tawil, J.J.

    1984-07-01

    The primary objective of this report is to conduct a preliminary benefit-cost study for the proposed power addition to FFTF to determine whether the project is cost-effective. If the project is authorized, construction will begin in 1986 and end in 1991. Full power operation is scheduled to begin in 1991 and a project life of 20 years is assumed. The undiscounted cost during the construction period of the FFTF power addition is estimated to be approximately $117 million over the construction period (1984 dollars). An additional $3 million is estimated as the opportunity cost - or value of these resources in their most favorable alternative use - of surplus FFTF equipment and unused CRBR equipment, including materials for steam generator fabrication. The annual operating and maintenance cost of the project is estimated to be about $2.1 million in 1984 dollars. 20 references

  5. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  6. Preliminary identification of problem soils for infrastructure projects

    CSIR Research Space (South Africa)

    Paige-Green, P

    2008-11-01

    Full Text Available soils are those within the top 1.0m or 1.5m of the soil profile, a mechanism for evaluating these materials without preliminary filed work and testing would be invaluable. Since 1971, the Department of Agriculture has systematically mapped the soils...

  7. Optimisation of small-scale hydropower using quality assurance methods - Preliminary project; Vorprojekt: Optimierung von Kleinwasserkraftwerken durch Qualitaetssicherung. Programm Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Hofer, S.; Staubli, T.

    2006-11-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary project that examined how quality assurance methods can be used in the optimisation of small-scale hydropower projects. The aim of the project, to use existing know-how, experience and synergies, is examined. Discrepancies in quality and their effects on production prices were determined in interviews. The paper describes best-practice guidelines for the quality assurance of small-scale hydro schemes. A flow chart describes the various steps that have to be taken in the project and realisation work. Information collected from planners and from interviews made with them are presented along with further information obtained from literature. The results of interviews concerning planning work, putting to tender and the construction stages of these hydro schemes are presented and commented on. Similarly, the operational phase of such power plant is also examined, including questions on operation and guarantees. The aims of the follow-up main project - the definition of a tool and guidelines for ensuring quality - are briefly reviewed.

  8. 76 FR 46357 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-08-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  9. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  10. Proposing a project for building an e-commerce website for Ryijypalvelu-RP Oy

    OpenAIRE

    Sotkov, Ilya

    2014-01-01

    The thesis describes the development of a project proposal report for building an e-commerce website for a small textile firm based in Helsinki, Finland. The aim of the study is to determine how small businesses that are currently not highly involved in e-commerce should approach developing an e-commerce website in order to maximize the positive impact of selling on the Internet. The study combined the use of action research and qualitative research methodologies by developing a project p...

  11. Preliminary Study of the Effect of the Proposed Long Lake Valley Project Operation on the Transport of Larval Suckers in Upper Klamath Lake, Oregon

    Science.gov (United States)

    Wood, Tamara M.

    2009-01-01

    A hydrodynamic model of Upper Klamath and Agency Lakes, Oregon, was used to explore the effects of the operation of proposed offstream storage at Long Lake Valley on transport of larval suckers through the Upper Klamath and Agency Lakes system during May and June, when larval fish leave spawning sites in the Williamson River and springs along the eastern shoreline and become entrained in lake currents. A range in hydrologic conditions was considered, including historically high and low outflows and inflows, lake elevations, and the operation of pumps between Upper Klamath Lake and storage in Long Lake Valley. Two wind-forcing scenarios were considered: one dominated by moderate prevailing winds and another dominated by a strong reversal of winds from the prevailing direction. On the basis of 24 model simulations that used all combinations of hydrology and wind forcing, as well as With Project and No Action scenarios, it was determined that the biggest effect of project operations on larval transport was the result of alterations in project management of the elevation in Upper Klamath Lake and the outflow at the Link River and A Canal, rather than the result of pumping operations. This was because, during the spring time period of interest, the amount of water pumped between Upper Klamath Lake and Long Lake Valley was generally small. The dominant effect was that an increase in lake elevation would result in more larvae in the Williamson River delta and in Agency Lake, an effect that was enhanced under conditions of wind reversal. A decrease in lake elevation accompanied by an increase in the outflow at the Link River had the opposite effect on larval concentration and residence time.

  12. A preliminary examination of audience-related communications issues for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.

    1991-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation doses people may have received from exposure to radioactive materials released during past operations at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project was initiated in response to public concerns about possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to effectively communicate to the many different concerned audiences. Accordingly, the TSP directed PNL to examine methods for communicating causes and effects of uncertainties in the dose estimates. After considering the directive and discussing it with the Communications Subcommittee of the TSP, PNL undertook a broad investigation of communications methods to consider for inclusion in the TSP's current communications program. As part of this investigation, a literature review was conducted regarding risk communications. A key finding was that, in order to successfully communicate risk-related information, a thorough understanding of the knowledge level, concerns and information needs of the intended recipients (i.e., the audience) is necessary. Hence, a preliminary audience analysis was conducted as part of the present research. This report summarizes the results of this analysis. 1 ref., 9 tabs.

  13. On Preliminary Test Estimator for Median

    OpenAIRE

    Okazaki, Takeo; 岡崎, 威生

    1990-01-01

    The purpose of the present paper is to discuss about estimation of median with a preliminary test. Two procedures are presented, one uses Median test and the other uses Wilcoxon two-sample test for the preliminary test. Sections 3 and 4 give mathematical formulations of such properties, including mean square errors with one specified case. Section 5 discusses their optimal significance levels of the preliminary test and proposes their numerical values by Monte Carlo method. In addition to mea...

  14. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  15. Swedish methane gas project: a proposal with three alternatives. Svenskt metangasprojekt: ett foerslag med tre alternativ

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    A proposal concerning a BIOGAS project is given. The proposal includes: (a) microbiological research on, e.g., needs for additives to optimize the process, influence of the content of dry substance, high rate digesters, one- or two-stage processing, temperature tolerance, pH regulation, pressure dependence, methods for process regulation, hygienics, foam-quenching; (b) construction of a test plant equipped with instruments for analysis and supervision; and (c) construction of prototype plants at a swine farm and at a slaughterhouse. Detailed budgets and schedules are given for the project at three different possible total costs.

  16. The Mediterranean Solar Plan: Project proposals for renewable energy in the Mediterranean Partner Countries region

    International Nuclear Information System (INIS)

    Jablonski, Sophie; Tarhini, Mohamad; Touati, Manaf; Gonzalez Garcia, David; Alario, Juan

    2012-01-01

    This paper presents a first assessment of the renewable energy projects, proposed by the nine Mediterranean Partner Countries (MPCs) under the Mediterranean Solar Plan (MSP) and the associated potential economic impacts. As one of the priority projects of the Union for the Mediterranean (UfM), the MSP's objective which attracted most attention until now is the intention to deploy an additional 20 GW of renewable electrical capacity in the Southern and Eastern Mediterranean region (covering the MPCs plus Turkey) by 2020. The main findings of this research are: (1) as of February 2010, a total of 10.3 GW of renewable project proposals were identified in the MPCs, corresponding to about half of the 20 GW target; (2) investment needs for the identified projects could amount to EUR 21 billion by 2020, which represents about five times the amount invested by the region in conventional electricity generation in the last decade; and (3) the difference between the cost of renewable electricity generation and the economic cost of its fossil fuel alternatives could amount to EUR 1.2 billion. Insights stemming from the results of this research can generate useful regional messages for energy policy leaders in the MPCs to accelerate the development of renewable energy projects. - Highlights: ► We conducted a systematic survey of renewable energy projects in the Mediterranean. ► The identified projects correspond to half the MSP 20 GW target. ► Maturity assessment is used to classify the advancement of the projects. ► We estimated the investment needs and required subsidies in the region by 2020.

  17. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  18. Synthesis Study of a 6-Element Non-Uniform Array with Tilted Elements for CLARREO Project

    Science.gov (United States)

    Jamnejad, Vahraz; Hoorfar, Ahmad

    2012-01-01

    This paper presents the results of a preliminary study of the gain/pattern properties of a 6-element Radio Occultation (RO) array for the proposed CLARREO (Climate Absolute Radiance and Refractivity Observatory (CLARREO) Project. CLARREO is one of the 4 highest priority missions recommended in the National Research Council Earth Science Decadal Survey.

  19. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Progress and Preliminary Results

    Science.gov (United States)

    Rosenzweig, C.

    2011-12-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a distributed climate-scenario simulation exercise for historical model intercomparison and future climate change conditions with participation of multiple crop and agricultural trade modeling groups around the world. The goals of AgMIP are to improve substantially the characterization of risk of hunger and world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. Recent progress and the current status of AgMIP will be presented, highlighting three areas of activity: preliminary results from crop pilot studies, outcomes from regional workshops, and emerging scientific challenges. AgMIP crop modeling efforts are being led by pilot studies, which have been established for wheat, maize, rice, and sugarcane. These crop-specific initiatives have proven instrumental in testing and contributing to AgMIP protocols, as well as creating preliminary results for aggregation and input to agricultural trade models. Regional workshops are being held to encourage collaborations and set research activities in motion for key agricultural areas. The first of these workshops was hosted by Embrapa and UNICAMP and held in Campinas, Brazil. Outcomes from this meeting have informed crop modeling research activities within South America, AgMIP protocols, and future regional workshops. Several scientific challenges have emerged and are currently being addressed by AgMIP researchers. Areas of particular interest include geospatial weather generation, ensemble methods for climate scenarios and crop models, spatial aggregation of field-scale yields to regional and global production, and characterization of future changes in climate variability.

  20. Preliminary shielding estimates for the proposed Oak Ridge National Laboratory (ORNL) Radioactive Ion Beam Facility (RIBF)

    International Nuclear Information System (INIS)

    Johnson, J.O.; Gabriel, T.A.; Lillie, R.A.

    1996-01-01

    The Oak Ridge National Laboratory (ORNL) has proposed designing and implementing a new target-ion source for production and injection of negative radioactive ion beams into the Hollifield tandem accelerator. This new facility, referred to as the Radioactive Ion Beam Facility (RIBF), will primarily be used to advance the scientific communities' capabilities for performing state-of-the-art cross-section measurements. Beams of protons or other light, stable ions from the Oak Ridge Isochronous Cyclotron (ORIC) will be stopped in the RIBF target ion source and the resulting radioactive atoms will be ionized, charge exchanged, accelerated, and injected into the tandem accelerator. The ORIC currently operates with proton energies up to 60 MeV and beam currents up to 100 microamps with a maximum beam power less than 2.0 kW. The proposed RIBF will require upgrading the ORIC to generate proton energies up to 200 MeV and beam currents up to 200 microamps for optimum performance. This report summarizes the results of a preliminary one-dimensional shielding analysis of the proposed upgrade to the ORIC and design of the RIBF. The principal objective of the shielding analysis was to determine the feasibility of such an upgrade with respect to existing shielding from the facility structure, and additional shielding requirements for the 200 MeV ORIC machine and RIBF target room

  1. Preliminary Assessment of Potential Avian Interactions at Four Proposed Wind Energy Facilities on Vandenberg Air Force Base, California

    Energy Technology Data Exchange (ETDEWEB)

    2004-08-01

    The United States Air Force (USAF) is investigating whether to install wind turbines to provide a supplemental source of electricity at Vandenberg Air Force Base (VAFB) near Lompoc, California. As part of that investigation, VAFB sought assistance from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to provide a preliminary characterization of the potential risk to wildlife resources (mainly birds and bats) from wind turbine installations. With wind power development expanding throughout North America and Europe, concerns have surfaced over the number of bird fatalities associated with wind turbines. Guidelines developed for the wind industry by the National Wind Coordinating Committee (NWCC) recommend assessing potential impacts to birds, bats, and other potentially sensitive resources before construction. The primary purpose of an assessment is to identify potential conflicts with sensitive resources, to assist developers with identifying their permitting needs, and to develop strategies to avoid impacts or to mitigate their effects. This report provides a preliminary (Phase I) biological assessment of potential impacts to birds and bats that might result from construction and operation of the proposed wind energy facilities on VAFB.

  2. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO2 Hub Storage: Production and Injection at Kevin Dome

    Energy Technology Data Exchange (ETDEWEB)

    Daley, Thomas M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Vasco, Don [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ajo-Franklin, Jonathan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dobeck, Laura [Montana State Univ., Bozeman, MT (United States); Spangler, Lee [Montana State Univ., Bozeman, MT (United States); Leonti, Michelle [Montana State Univ., Bozeman, MT (United States)

    2017-06-27

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

  3. Preliminary project of s Thomson scattering system for the ETE tokamak; Projeto preliminar de um sistema de espalhamento Thomson para o Tokamak ETE

    Energy Technology Data Exchange (ETDEWEB)

    Berni, Luiz Angelo

    1997-12-31

    This report presents the preliminary project of the injection and laser light block system for the Thomson (ET) scattering diagnostic to be implanted at the ETE spheric tokamak of the Instituto Nacional de Pesquisas Espaciais (INPE/LAP). Also, a scanning system for the optics of scattered light 4 refs., 26 figs.

  4. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  5. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  6. Energy strategy of the Republic of Croatia by the year 2020 (Proposal); Energetska strategija Republike Hrvatske do 2020. godine (Prijedlog)

    Energy Technology Data Exchange (ETDEWEB)

    Kramberger, V [Ministry of Economy, Zagreb (Croatia); Ministry of Economy of the Republic of Croatia, Project PROHES

    1997-12-31

    In this paper a proposal on the `Energy strategy of the Republic of Croatia by the year 2020` has been presented. The proposal has been worked out on the basis of the preliminary results of the project `Croatian energy sector development and organization` - PROHES printed in July 1995. The discussion on the strategy has been carried out in the bodies of the PROHES (Board of Directors and Experts Council) and supplemented with suggestions on the discussion. (author). 11 figs., 5 tabs.

  7. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    Science.gov (United States)

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  8. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  9. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  10. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  11. Preliminary Design of KAIST Micro Modular Reactor with Dry Air Cooling

    Energy Technology Data Exchange (ETDEWEB)

    Baik, Seung Joon; Bae, Seong Jun; Kim, Seong Gu; Lee, Jeong Ik [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2014-05-15

    KAIST research team recently proposed a Micro Modular Reactor (MMR) concept which integrates power conversion unit (PCU) with the reactor core in a single module. Using supercritical CO{sub 2} as a working fluid of cycle can achieve physically compact size due to small turbomachinery and heat exchangers. The objective of this project is to develop a concept that can operate at isolated area. The design focuses especially on the operation in the inland area where cooling water is insufficient. Thus, in this paper the potential for dry air cooling of the proposed reactor will be examined by sizing the cooling system with preliminary approach. The KAIST MMR is a recently proposed concept of futuristic SMR. The MMR size is being determined to be transportable with land transportation. Special attention is given to the MMR design on the dry cooling, which the cooling system does not depend on water. With appropriately designed air cooling heat exchanger, the MMR can operate autonomously. Two types of air cooling methods are suggested. One is using fan and the other is utilizing cooling tower for the air flow. With fan type air cooling method it consumes about 0.6% of generated electricity from the nuclear reactor. Cooling tower occupies an area of 227 m{sup 2} and 59.6 m in height. This design is just a preliminary estimation of the dry cooling method, and therefore more detailed and optimal design will be followed in the next phase.

  12. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  13. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    International Nuclear Information System (INIS)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10 9 electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE's National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE's evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc

  14. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  15. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    Science.gov (United States)

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  16. 77 FR 20355 - Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps

    Science.gov (United States)

    2012-04-04

    ... collection). Affected Public: Current recipients of EDA assistance, to include (1) cities or other political... DEPARTMENT OF COMMERCE Economic Development Administration Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps AGENCY: Economic Development...

  17. Preliminary Study on the High Efficiency Supercritical Pressure Water-Cooled Reactor for Electricity Generation

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Yoon Yeong; Park, Jong Kyun; Cho, Bong Hyun and others

    2006-01-15

    This research has been performed to introduce a concept of supercritical pressure water cooled reactor(SCWR) in Korea The area of research includes core conceptual design, evaluation of candidate fuel, fluid systems conceptual design with mechanical consideration, preparation of safety analysis code, and construction of supercritical pressure heat transfer test facility, SPHINX, and preliminary test. As a result of the research, a set of tools for the reactor core design has been developed and the conceptual core design with solid moderator was proposed. The direct thermodynamic cycle has been studied to find a optimum design. The safety analysis code has also been adapted to supercritical pressure condition. A supercritical pressure CO2 heat transfer test facility has been constructed and preliminary test proved the facility works as expected. The result of this project will be good basis for the participation in the international collaboration under GIF GEN-IV program and next 5-year mid and long term nuclear research program of MOST. The heat transfer test loop, SPHINX, completed as a result of this project may be used for the power cycle study as well as further heat transfer study for the various geometries.

  18. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  19. Preliminary Analysis and Selection of Mooring Solution Candidates

    DEFF Research Database (Denmark)

    Thomsen, Jonas Bjerg; Delaney, Martin

    This report covers a preliminary analysis of mooring solutions candidates for four large floating wave energy converters. The work is part of the EUDP project “Mooring Solutions for Large Wave Energy Converters” and is the outcome of "Work Package 3: Preliminary Analysis". The report further...... compose the "Milestone 4: Report on results of preliminary analysis and selection of final candidates. The report is produced by Aalborg University with input from the partner WECs Floating Power Plant, KNSwing, LEANCON and Wave Dragon. Tension Technology International (TTI) has provided a significant...

  20. Preliminary safety evaluation for the spent nuclear fuel project`s cold vacuum drying system

    Energy Technology Data Exchange (ETDEWEB)

    Garvin, L.J., Westinghouse Hanford

    1996-07-01

    This preliminary safety evaluation (PSE) considers only the Cold Vacuum Drying System (CVDS) facility and its mission as it relates to the integrated process strategy (WHC 1995). The purpose of the PSE is to identify those CBDS design functions that may require safety- class and safety-significant accident prevention and mitigation features.

  1. Benchmarking and validation activities within JEFF project

    Directory of Open Access Journals (Sweden)

    Cabellos O.

    2017-01-01

    Full Text Available The challenge for any nuclear data evaluation project is to periodically release a revised, fully consistent and complete library, with all needed data and covariances, and ensure that it is robust and reliable for a variety of applications. Within an evaluation effort, benchmarking activities play an important role in validating proposed libraries. The Joint Evaluated Fission and Fusion (JEFF Project aims to provide such a nuclear data library, and thus, requires a coherent and efficient benchmarking process. The aim of this paper is to present the activities carried out by the new JEFF Benchmarking and Validation Working Group, and to describe the role of the NEA Data Bank in this context. The paper will also review the status of preliminary benchmarking for the next JEFF-3.3 candidate cross-section files.

  2. Benchmarking and validation activities within JEFF project

    Science.gov (United States)

    Cabellos, O.; Alvarez-Velarde, F.; Angelone, M.; Diez, C. J.; Dyrda, J.; Fiorito, L.; Fischer, U.; Fleming, M.; Haeck, W.; Hill, I.; Ichou, R.; Kim, D. H.; Klix, A.; Kodeli, I.; Leconte, P.; Michel-Sendis, F.; Nunnenmann, E.; Pecchia, M.; Peneliau, Y.; Plompen, A.; Rochman, D.; Romojaro, P.; Stankovskiy, A.; Sublet, J. Ch.; Tamagno, P.; Marck, S. van der

    2017-09-01

    The challenge for any nuclear data evaluation project is to periodically release a revised, fully consistent and complete library, with all needed data and covariances, and ensure that it is robust and reliable for a variety of applications. Within an evaluation effort, benchmarking activities play an important role in validating proposed libraries. The Joint Evaluated Fission and Fusion (JEFF) Project aims to provide such a nuclear data library, and thus, requires a coherent and efficient benchmarking process. The aim of this paper is to present the activities carried out by the new JEFF Benchmarking and Validation Working Group, and to describe the role of the NEA Data Bank in this context. The paper will also review the status of preliminary benchmarking for the next JEFF-3.3 candidate cross-section files.

  3. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  4. Preliminary results from the ESA STSE project on SST diurnal variability, its regional extent and implications in atmospheric modelling (SSTDV:R.EX.–IM.A.M.)

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Hasager, Charlotte Bay; Høyer, Jacob L.

    2013-01-01

    This study presents some preliminary results of the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). Comparisons of SEVIRI SST with AATSR...

  5. Statistical CT noise reduction with multiscale decomposition and penalized weighted least squares in the projection domain

    International Nuclear Information System (INIS)

    Tang Shaojie; Tang Xiangyang

    2012-01-01

    Purposes: The suppression of noise in x-ray computed tomography (CT) imaging is of clinical relevance for diagnostic image quality and the potential for radiation dose saving. Toward this purpose, statistical noise reduction methods in either the image or projection domain have been proposed, which employ a multiscale decomposition to enhance the performance of noise suppression while maintaining image sharpness. Recognizing the advantages of noise suppression in the projection domain, the authors propose a projection domain multiscale penalized weighted least squares (PWLS) method, in which the angular sampling rate is explicitly taken into consideration to account for the possible variation of interview sampling rate in advanced clinical or preclinical applications. Methods: The projection domain multiscale PWLS method is derived by converting an isotropic diffusion partial differential equation in the image domain into the projection domain, wherein a multiscale decomposition is carried out. With adoption of the Markov random field or soft thresholding objective function, the projection domain multiscale PWLS method deals with noise at each scale. To compensate for the degradation in image sharpness caused by the projection domain multiscale PWLS method, an edge enhancement is carried out following the noise reduction. The performance of the proposed method is experimentally evaluated and verified using the projection data simulated by computer and acquired by a CT scanner. Results: The preliminary results show that the proposed projection domain multiscale PWLS method outperforms the projection domain single-scale PWLS method and the image domain multiscale anisotropic diffusion method in noise reduction. In addition, the proposed method can preserve image sharpness very well while the occurrence of “salt-and-pepper” noise and mosaic artifacts can be avoided. Conclusions: Since the interview sampling rate is taken into account in the projection domain

  6. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  7. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  8. The studsvik BNCT project: structure and the proposed protocols

    International Nuclear Information System (INIS)

    Capala, J.; Stenstam, B.H.; Skoeld, K.; Henriksson, R.; Salford, L.; Carlsson, J.

    2000-01-01

    The BNCT facility at Studsvik is now ready for clinical trials. Scientific operations of the Studsvik BNCT project are overseen by the Scientific Advisory Board comprised of representatives of all major universities in Sweden. Furthermore, special task groups for clinical and preclinical studies have been formed to facilitate collaboration with academia and to assure the quality of the research. Proposed clinical Phase II trials for glioblastoma are sponsored by the Swedish National Neuro-Oncology Group and, initially, will involve two protocols: Protocol no.1. BNCT for glioblastoma patients who have not received any therapy other than surgery (including stereotactic biopsy only). Protocol no.2. BNCT as a palliative treatment for patients with recurrent glioblastoma following conventional therapies or BNCT. In both protocols, BPA, administered by a 6 hour i.v. infusion, will be used as the boron delivery agent. (author)

  9. Project Rulison: a preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M Jr; Bray, B G; Mann, R L

    1970-01-01

    Project Rulison was designed to use underground nuclear technology to determine the potential of this technique for commercial development of the deep, thick, lenticular, low permeability, Mesaverde Formation of the Tuli Rulison field in Garfield County, Colorado. A feasibility study completed in July 1966 indicated that nuclear explosives were a potentially economic method of stimulating recovery of natural gas from the reservoir. The gas-in-place, estimated to be between 90 to 125 billion cu ft per 640 acres from earlier wells, was confirmed from information obtained on 2 conventional wells completed in 1966. The Project Rulison exploratory well, R-EX, was completed in May 1968. Detailed testing of this well provided data on geology, hydrology and reservoir characteristics. The data obtained from the testing have been used to determine the flow capacity of the Mesaverde reservoir. The reservoir characteristics were then used as input data to make predictions of post-shot reservoir performance in the nuclear stimulated well, using a radial, unsteady state gas-flow computer model. (20 refs.)

  10. Multiple Clustering Views via Constrained Projections

    DEFF Research Database (Denmark)

    Dang, Xuan-Hong; Assent, Ira; Bailey, James

    2012-01-01

    Clustering, the grouping of data based on mutual similarity, is often used as one of principal tools to analyze and understand data. Unfortunately, most conventional techniques aim at finding only a single clustering over the data. For many practical applications, especially those being described...... in high dimensional data, it is common to see that the data can be grouped into different yet meaningful ways. This gives rise to the recently emerging research area of discovering alternative clusterings. In this preliminary work, we propose a novel framework to generate multiple clustering views....... The framework relies on a constrained data projection approach by which we ensure that a novel alternative clustering being found is not only qualitatively strong but also distinctively different from a reference clustering solution. We demonstrate the potential of the proposed framework using both synthetic...

  11. Malawi faith communities responding to HIV/AIDS: preliminary ...

    African Journals Online (AJOL)

    This paper reports on the preliminary findings (year one) of a four-year intervention and participatory-action research (PAR) project in Malawi. Project goals are to enhance the response capacity and effectiveness of faith community (FC) leaders to the problem of HIV/AIDS. Ethnographic interviews with FC leaders were ...

  12. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  13. New proposal on the development of machine protection functions for ITER diagnostics control

    International Nuclear Information System (INIS)

    Yamamoto, Tsuyoshi; Yatsuka, Eiichi; Hatae, Takaki; Takeuchi, Masaki; Kitazawa, Sin-iti; Ogawa, Hiroaki; Kawano, Yasunori; Itami, Kiyoshi; Ota, Kazuya; Hashimoto, Yasunori; Nakamura, Kitaru; Sugie, Tatsuo

    2016-01-01

    There is a need to develop ITER instrumentation and control (I and C) systems with high reliabilities. Interlock systems that activate machine protection functions are implemented on robust wired-logic systems such as programmable logic controllers (PLCs). We herein propose a software tool that generates program code templates for the control systems using PLC logic. This tool decreases careless mistakes by developers and increases reliability of the program codes. A large-scale engineering database has been implemented in the ITER project. To derive useful information from this database, we propose adding semantic data to it using the Resource Description Framework format. In our novel proposal for the ITER diagnostic control system, a guide words generator that analyzes the engineering data by inference is applied to the hazard and operability study. We validated the methods proposed in this paper by applying them to the preliminary design for the I and C system of the ITER edge Thomson scattering system. (author)

  14. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  15. Monitoring of German Fertility: Estimation of Monthly and Yearly Total Fertility Rates on the Basis of Preliminary Monthly Data

    Directory of Open Access Journals (Sweden)

    Gabriele Doblhammer

    2011-02-01

    Full Text Available This paper introduces a set of methods for estimating fertility indicators in the absence of recent and short-term birth statistics. For Germany, we propose a set of straightforward methods that allow for the computation of monthly and yearly total fertility rates (mTFR on the basis of preliminary monthly data, including a confidence interval. The method for estimating most current fertility rates can be applied when no information on the age structure and the number of women exposed to childbearing is available. The methods introduced in this study are useful for calculating monthly birth indicators, with minimal requirements for data quality and statistical effort. In addition, we suggest an approach for projecting the yearly TFR based on preliminary monthly information up to June.

  16. 75 FR 27854 - 30-Day Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in...

    Science.gov (United States)

    2010-05-18

    ... Information Collection: DS-4048, Projected Sales of Major Weapons in Support of Section 25(a)(1) of the Arms... Reduction Act of 1995. Title of Information Collection: Projected Sales of Major Weapons in Support of... automated collection techniques or other forms of technology. Abstract of proposed collection: Section 25(a...

  17. Mining-metallurgical projects for the production of uranium concentrates

    International Nuclear Information System (INIS)

    Ajuria-Garza, S.

    1983-01-01

    This report presents an overall view of a complete project for a mining-metallurgical complex for the production of uranium concentrates. Relevant aspects of each important topic are discussed as parts of an integrated methodology. The principal project activities are analyzed and the relationships among the various factors affecting the design are indicated. A list of 96 principal activities is proposed as an example. These activities are distributed in eight groups: initial evaluations preliminary feasibility studies, project engineering, construction, industrial operation, decommissioning and post-decommissioning activities. The environmental impact and the radiological risks due to the construction and operation of the mining metallurgical complex are analyzed. The principles of radiological protection and the regulations, standards and recommendations for radiological protection in uranium mines and mills are discussed. This report is also a guide to the specialized literature: a bibliography with 765 references is included. (author)

  18. Proposed Fermilab upgrade main injector project

    International Nuclear Information System (INIS)

    1992-04-01

    The US Department of Energy (DOE) proposes to construct and operate a ''Fermilab Main Injector'' (FMI), a 150 GeV proton injector accelerator, at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The purpose and need for this action are given of this Environmental Assessment (EA). A description of the proposed FMI and construction activities are also given. The proposed FMI would be housed in an underground tunnel with a circumference of approximately 2.1 miles (3.4 kilometers), and the construction would affect approximately 135 acres of the 6,800 acre Fermilab site. The purpose of the proposed FMI is to construct and bring into operation a new 150 GeV proton injector accelerator. This addition to Fermilab's Tevatron would enable scientists to penetrate ever more deeply into the subatomic world through the detection of the super massive particles that can be created when a proton and antiproton collide head-on. The conversion of energy into matter in these collisions makes it possible to create particles that existed only an instant after the beginning of time. The proposed FMI would significantly extend the scientific reach of the Tevatron, the world's first superconducting accelerator and highest energy proton-antiproton collider

  19. Preliminary Hazards Analysis Plasma Hearth Process

    International Nuclear Information System (INIS)

    Aycock, M.; Coordes, D.; Russell, J.; TenBrook, W.; Yimbo, P.

    1993-11-01

    This Preliminary Hazards Analysis (PHA) for the Plasma Hearth Process (PHP) follows the requirements of United States Department of Energy (DOE) Order 5480.23 (DOE, 1992a), DOE Order 5480.21 (DOE, 1991d), DOE Order 5480.22 (DOE, 1992c), DOE Order 5481.1B (DOE, 1986), and the guidance provided in DOE Standards DOE-STD-1027-92 (DOE, 1992b). Consideration is given to ft proposed regulations published as 10 CFR 830 (DOE, 1993) and DOE Safety Guide SG 830.110 (DOE, 1992b). The purpose of performing a PRA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PRA then is followed by a Preliminary Safety Analysis Report (PSAR) performed during Title I and II design. This PSAR then leads to performance of the Final Safety Analysis Report performed during construction, testing, and acceptance and completed before routine operation. Radiological assessments indicate that a PHP facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous material assessments indicate that a PHP facility will be a Low Hazard facility having no significant impacts either onsite or offsite to personnel and the environment

  20. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    International Nuclear Information System (INIS)

    Chareyron, Bruno

    2012-01-01

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 μSv/h compared to 0.15 μSv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  1. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  2. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  3. Preliminary comparative estimate of the environmental externalities of the electrical generation in Cuba

    International Nuclear Information System (INIS)

    Turtos Carbonell, L.

    1998-01-01

    Determination of the externalises associated with the electrical generation and fundamentally its atmospherically environmental impact, win greater importance nowadays, with the objective that to medium term these could be incorporated into the economy of electricity production as the surest way to reduce this impact. In the work is accomplished a comparative preliminary estimate of the externalises of the electrical generation in Cuba based in the results obtained in the External Project (Externalises of Energy) and the emissions of the domestic Power Plant. Different processes to reduce these emissions are proposed. The economic feasibility of installing Abatement Emissions Technologies based on the calculated externalises is analyzed

  4. Light ion production for a future radiobiological facility at CERN: preliminary studies.

    Science.gov (United States)

    Stafford-Haworth, Joshua; Bellodi, Giulia; Küchler, Detlef; Lombardi, Alessandra; Röhrich, Jörg; Scrivens, Richard

    2014-02-01

    Recent medical applications of ions such as carbon and helium have proved extremely effective for the treatment of human patients. However, before now a comprehensive study of the effects of different light ions on organic targets has not been completed. There is a strong desire for a dedicated facility which can produce ions in the range of protons to neon in order to perform this study. This paper will present the proposal and preliminary investigations into the production of light ions, and the development of a radiobiological research facility at CERN. The aims of this project will be presented along with the modifications required to the existing linear accelerator (Linac3), and the foreseen facility, including the requirements for an ion source in terms of some of the specification parameters and the flexibility of operation for different ion types. Preliminary results from beam transport simulations will be presented, in addition to some planned tests required to produce some of the required light ions (lithium, boron) to be conducted in collaboration with the Helmholtz-Zentrum für Materialien und Energie, Berlin.

  5. Preliminary radiation shielding design for BOOMERANG

    International Nuclear Information System (INIS)

    Donahue, Richard J.

    2002-01-01

    Preliminary radiation shielding specifications are presented here for the 3 GeV BOOMERANG Australian synchrotron light source project. At this time the bulk shield walls for the storage ring and injection system (100 MeV Linac and 3 GeV Booster) are considered for siting purposes

  6. Preliminary project concerning the straw-fueled combined power-heat plant to be constructed at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-06-01

    Power and heat generation based on biomass gasification is of great importance due to its beneficial environmental effects and good economy. This report concerns a preliminary project on feasibility and problems of implementing a dual-purpose power plant, supplying both power and district heating to several schools, swimming pools and other public facilities at Glamsbjerg (Funen). The plant is to be based on thermal gasification (pyrolysis) of straw and use of the gas in a diesel engine. The diesels operate the power generator, and their waste heat should be utilized in the local district heating network. In order to establish a stable and flexible straw supply to the plant an evaluation of resources in the area has been carried out. Apart from straw-derived fuel the plant is planned to use natural gas for start and maintenance of the process. The prices of the combined plant and of the fuel processing are estimated in the report. (EG)

  7. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Science.gov (United States)

    2010-06-24

    .... ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies... result of a tiered environmental review process under the National Environmental Policy Act, 42 U.S.C... judicial review of the Tier 1 Federal agency actions of the proposed highway and transit project will be...

  8. Far-infrared elastic scattering proposal for the Avogadro Project's silicon spheres

    Science.gov (United States)

    Humayun, Muhammad Hamza; Khan, Imran; Azeem, Farhan; Chaudhry, Muhammad Rehan; Gökay, Ulaş Sabahattin; Murib, Mohammed Sharif; Serpengüzel, Ali

    2018-05-01

    Avogadro constant determines the number of particles in one mole of a substance, thus relating the molar mass of the substance to the mass of this substance. Avogadro constant is related to Système Internationale base units by defining the very concept of chemical quantity. Revisions of the base units created a need to redefine the Avogadro constant, where a collaborative work called the Avogadro Project is established to employ optical interferometry to measure the diameter of high quality 100 mm silicon spheres. We propose far-infrared spectroscopy for determining the Avogadro constant by using elastic scattering from the 100 mm Avogadro Project silicon spheres. Similar spectroscopic methods are already in use in the near-infrared, relating whispering gallery modes of the 1 mm silicon spheres to the diameter of the spheres. We present numerical simulations in the far-infrared and the near-infrared, as well as spatially scaled down elastic scattering measurements in the near-infrared. These numerical and experimental results show that, the diameter measurements of 100 mm single crystal silicon spheres with elastic scattering in the far-infrared can be considered as an alternative to optical interferometry.

  9. Feasibility and potential effects of the proposed Amargosa Creek Recharge Project, Palmdale, California

    Science.gov (United States)

    Christensen, Allen H.; Siade, Adam J.; Martin, Peter; Langenheim, V.E.; Catchings, Rufus D.; Burgess, Matthew K.

    2015-09-17

    Historically, the city of Palmdale and vicinity have relied on groundwater as the primary source of water, owing, in large part, to the scarcity of surface water in the region. Despite recent importing of surface water, groundwater withdrawal for municipal, industrial, and agricultural use has resulted in groundwater-level declines near the city of Palmdale in excess of 200 feet since the early 1900s. To meet the growing water demand in the area, the city of Palmdale has proposed the Amargosa Creek Recharge Project (ACRP), which has a footprint of about 150 acres along the Amargosa Creek 2 miles west of Palmdale, California. The objective of this study was to evaluate the long-term feasibility of recharging the Antelope Valley aquifer system by using infiltration of imported surface water from the California State Water Project in percolation basins at the ACRP.

  10. International projects on radioactive waste management in the Northwest region of Russia

    International Nuclear Information System (INIS)

    Melnikov, Nikolay

    1999-01-01

    This presentation deals with a project of the EC within the TACIS (Technical Assistance to the CIS - Commonwealth of Independent States) Programme ''Improvement of Safety of Radioactive Waste Management in the Northwest of Russia''. The individual subtasks considered are (1) Detailed project organisation, (2) Conceptual repository design, (3) Identification of suitable sites, (4) Identification of necessary site surveys, (5) Identification of necessary in-situ experiments, (6) Preliminary safety assessment of conceptual repositories, (7) Evaluation of suitable sites, (8) Draft repository waste acceptance criteria, (9) Conceptual design of surface infrastructures, (10) Outline of the future programme, and (11) Final report. There is a table showing the proposed repository sites and their geological environments

  11. Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

    Directory of Open Access Journals (Sweden)

    Cristofer André Caous

    2012-06-01

    Full Text Available Objective: To propose a measure (index of expected risks to evaluateand follow up the performance analysis of research projects involvingfinancial and adequate structure parameters for its development.Methods: A ranking of acceptable results regarding researchprojects with complex variables was used as an index to gauge aproject performance. In order to implement this method the ulcerindex as the basic model to accommodate the following variableswas applied: costs, high impact publication, fund raising, and patentregistry. The proposed structured analysis, named here as RoSI(Return on Scientific Investment comprises a pipeline of analysis tocharacterize the risk based on a modeling tool that comprises multiplevariables interacting in semi-quantitatively environments. Results:This method was tested with data from three different projects in ourInstitution (projects A, B and C. Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C related to development and expected results according to initial or full investment. Conclusion: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  12. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  13. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  14. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  15. Federal subsidies for preliminary studies for small-scale hydropower installations: degree of implementation of preliminary study projects 1993-2001 - Short evaluation of the effect of federal subsidies; Bundesbeitraege an Vorstudien fuer Kleinwasserkraftwerke. Realisierungsstand der Vorstudienprojekte 1993 bis 2001. Kurzevaluation der Auswirkungen der Bundesbeitraege (1996)

    Energy Technology Data Exchange (ETDEWEB)

    Kuster, J.; Suter, Ph.

    2002-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a short survey of 70 projects that received support from the Swiss Federation during their preliminary study phases. Projects are reviewed for the period between 1993 and 2001. The results obtained from the survey are presented; these are considered by the authors to be well-founded as a result of the high questionnaire return rate of 84%. The report analyses the projects as far as their degree of realisation is concerned and discusses the results. The survey also provides information on the power produced by those installations that have already been realised. For those projects that were not realised, the reasons for the negative investment decision are noted. Projects that are in the process of being implemented are discussed.

  16. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  17. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  18. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  19. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  20. 32 CFR 206.4 - Proposal development and review.

    Science.gov (United States)

    2010-07-01

    ... representatives from the research, business, and government communities. Every effort will be made to ensure balance (geographical, ethnic, gender, institutional type, subject matter) across the entire competition... following issues in the preliminary proposal: (1) How the proposal addresses issues of national capacity in...

  1. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    and clarification of decision situations and consequences is rarely used in practice and structured reasoning about project and product performance when making decisions is also rare. In order to enhance the project managers’ understanding of decision-making in product development projects, the objective......A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business....... In product development projects it is desirable to reduce the level of uncertainty in order to make decisions without having to redo them later in the project resulting in longer lead time and higher costs. It is the project manager’s responsibility to manage this uncertainty in a complex ever...

  2. Preliminary safety analysis report for the TFTR

    International Nuclear Information System (INIS)

    Lind, K.E.; Levine, J.D.; Howe, H.J.

    A Preliminary Safety Analysis Report has been prepared for the Tokamak Fusion Test Reactor. No accident scenarios have been identified which would result in exposures to on-site personnel or the general public in excess of the guidelines defined for the project by DOE

  3. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    Science.gov (United States)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  4. Evaluation of dredged material proposed for ocean disposal from Red Hook/Bay Ridge project areas, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Red HookIBay Ridge project was to evaluate proposed dredged material from these two areas to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Sediment samples were collected from the Red Hook/Bay Ridge project areas. Tests and analyses were conducted. The evaluation of proposed dredged material from the Red Hook/Bay Ridge project areas consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests. Twenty-four individual sediment core samples were collected from these two areas and analyzed for grain size, moisture content, and total organic carbon (TOC). Three composite sediment samples, representing Red Hook Channel and the two Bay Ridge Reaches to be dredged, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the three Red Hook Bay Ridge sediment composites, were analyzed for metals, pesticides, and PCBS. Benthic acute toxicity tests were performed. Water-column or SPP toxicity tests were performed. Bioaccumulation tests were also conducted.

  5. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    International Nuclear Information System (INIS)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed

  6. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  7. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  8. Study of 3D solder-paste profilometer by dual digital fringe projection

    Science.gov (United States)

    Juan, Yi-Hua; Yih, Jeng-Nan; Cheng, Nai-Jen

    2013-09-01

    In a 3D profilometer by the fringe projection, the shadow will be produced inevitably, thus the fringes cannot be detected in the region of the shadow. In addition, a smooth surface or a metal surface produces the specular reflection, and then, no projection fringe can be recorded in the region of oversaturation on CCD. This paper reveals a proposed system for improved these defects and shows some preliminary improved 3D profiles by the proposed dual fringe projection. To obtain the profile of sample hided in the shadow and the oversaturation, this study used the dual-projection system by two projectors. This system adopted two different directions of fringe projection and illuminates them alternately, therefore, the shadow and the oversaturation produced in their corresponding locations. Two raw 3D profiles obtained from taking the dual-projection by the four-step phase-shift. A set of algorithms used to identify the pixels of the shadow and the oversaturation, and create an error-map. According to the error-map to compensate, two 3D profiles merged into an error-reduced 3D profile. We used the solder paste as a testing sample. After comparatively analyzing the 3D images obtained by our measurement system and by a contact stylus profilometer, the result shows that our measurement system can effectively reduce the error caused by shadows and oversaturation. Fringe projection system by using a projector is a non-contact, full field and quickly measuring system. The proposed dual-projection by dual-projectors can effectively reduce the shadow and the oversaturation errors and enhance the scope of application of the 3D contour detection, especially in the detection of precision structure parts with specular reflection.

  9. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Science.gov (United States)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  10. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    Directory of Open Access Journals (Sweden)

    Romeli Norsyakilah

    2018-01-01

    Full Text Available As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  11. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  12. Area Recommendation Report for the Crystalline Repository Project: Volume 1, Draft

    International Nuclear Information System (INIS)

    1986-01-01

    This Draft Area Recommendation Report for the Crystalline Repository Project identifies portions of crystalline rock bodies as proposed potentially acceptable sites for consideration in the second high-level radioactive waste repository program. The US Department of Energy evaluated available geologic and environmental data for 235 crystalline rock bodies in the North Central, Northeastern, and Southeastern regions to identify preliminary candidate areas. Further evaluation of these preliminary candidate areas resulted in the selection of 12 as proposed potentially acceptable sites. The 12 proposed potentially acceptable sites are located in the States of Georgia (1), Maine (2), Minnesota (3), New Hampshire (1), North Carolina (2), Virginia (2), and Wisconsin (1). The data, analyses, and rationale with which the 12 proposed potentially acceptable sites were selected are presented in this draft report. The analyses presented demonstrate that the evidence available for each proposed potentially acceptable site supports (1) a finding that the site is not disqualified in accordance with the application requirements of Appendix III of the siting guidelines and (2) a decision to proceed with the continued investigation of the site on the basis of the favorable and potentially adverse conditions identified to date. Once this report is finalized, potentially acceptable sites in crystalline rock will be formally identified by the Secretary of Energy, in accordance with the DOE siting guidelines. These potentially acceptable sites will be investigated and evaluated in more detail during the area phase of the siting process. An additional eight areas, which meet the requirements for identification as potentially acceptable sites, will retain their designation as candidate areas

  13. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  14. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-07

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  15. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  16. Preliminary study on the reactivation of the 'Lochmuehle' water mill in Welschenrohr

    International Nuclear Information System (INIS)

    Schindelholz, B.

    2003-01-01

    This preliminary study on the revitalisation of the 'Lochmuehle' water mill in Welschenrohr, Switzerland, describes ideas for the reactivation of an old water mill and its use as a small-scale hydropower plant. Details are given on the history of the mill, the hydrological conditions and on its proposed fitting with an 8 kW generator. The refurbished water wheel, its gears and other mill equipment are described. The costs and amortisation of the small hydropower station, the revenues that can be expected from its operation and other financial factors and prerequisites are discussed. Further, environmental and legal aspects of the project are examined and suggestions are made for the next steps to be taken towards the realisation of this small hydropower plant

  17. New Regional and Global HFC Projections and Effects of National Regulations and Montreal Protocol Amendment Proposals

    Science.gov (United States)

    Velders, G. J. M.

    2015-12-01

    Hydrofluorocarbons (HFCs) are used as substitutes for ozone-depleting substances that are being phased out globally under Montreal Protocol regulations. New global scenarios of HFC emissions reach 4.0-5.3 GtCO2-eq yr-1 in 2050, which corresponds to a projected growth from 2015 to 2050 which is 9% to 29% of that for CO2 over the same time period. New baseline scenarios are formulated for 10 HFC compounds, 11 geographic regions, and 13 use categories. These projections are the first to comprehensively assess production and consumption of individual HFCs in multiple use sectors and geographic regions with emission estimates constrained by atmospheric observations. In 2050, in percent of global HFC emissions, China (~30%), India and the rest of Asia (~25%), Middle East and northern Africa (~10%), and USA (~10%) are the principal source regions; and refrigeration and stationary air conditioning are the major use sectors. National regulations to limit HFC use have been adopted recently in the European Union, Japan and USA, and four proposals have been submitted in 2015 to amend the Montreal Protocol to substantially reduce growth in HFC use. Calculated baseline emissions are reduced by 90% in 2050 by implementing the North America Montreal Protocol amendment proposal. Global adoption of technologies required to meet national regulations would be sufficient to reduce 2050 baseline HFC consumption by more than 50% of that achieved with the North America proposal for most developed and developing countries. The new HFC scenarios and effects of national regulations and Montreal Protocol amendment proposals will be presented.

  18. Baseline environmental survey of proposed uranium mining projects of Domiasiat, Meghalaya

    International Nuclear Information System (INIS)

    Khathing, D.T.; Myrboh, B.; Nongkynrih, P.; War, S.A.; Marbaniang, D.G.; Iongwai, P.S.

    2005-01-01

    West Khasi Hills District of Meghalaya is identified as having a large and rich deposits of Uranium. However, actual extraction on a commercial scale that may lead to an increase in the socio-economic development of the state in particular and the country in general, is yet to be undertaken. This is due to lack of any baseline environmental survey giving rise to speculative information and causing a fear psychosis in the minds of the locals populace about the negative effects of Uranium mining. A preoperational survey and environmental monitoring of the proposed mining sites and its adjacent areas would establish the baseline status of the natural radioactivity and some chemical constituents in different environmental matrices via. air, water, soil, biota and aquatic ecosystems. The North Eastern Hill University, Shillong, Meghalaya has undertaken the Project funded by DST and BRNS, Department of Atomic Energy, Govt. of India which aims to provide baseline environmental data on ambient air, water and soil quality in and around the proposed Uranium mining site of Domiasiat, West Khasi Hills in the state of Meghalaya. Trace elements (elements like Mg, Zn, Ca, K, Na, Se, As, Fe, Cu, Co, Cr, Ni, Pb, Cd, Mn etc) and the status of the activity in the samples are determined. (author)

  19. Preliminary assessment of potential CDM early start projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

    2000-11-01

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest

  20. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  1. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  2. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Science.gov (United States)

    2011-02-01

    ... Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed Eagle Mountain Pumped... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments...

  3. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  4. Projeto larga escala: uma proposta pedagógica atual Larga escala project: an actual pedagogic proposal

    Directory of Open Access Journals (Sweden)

    Anna Luiza de F. P. Lins Gryschek

    2000-06-01

    Full Text Available Discorre-se sobre um projeto de formação dos atendentes de enfermagem, o conhecido "Projeto Larga Escala", seu histórico, a legislação que o ampara e a sua trajetória na Secretaria Municipal da Saúde do Município de São Paulo. Conclui-se que o "Projeto Larga Escala" é uma proposta pedagógica válida, devendo ser incentivada e ampliada em âmbito nacional.This study discourses about a nursing project, the well known "Larga Escala Project", its history, the legislation that gives support to it and its trajectory in the Health Secretary of the Township of São Paulo. The conclusion is that the "Larga Escala Project" is a valid pedagogic proposal and it must be encouraged and amplified to all the national field.

  5. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field.

  6. A wood-waste fuelled, indirectly-fired gas turbine cogeneration plant for sawmill application. Phase 1. Preliminary engineering design and financial evaluation

    Energy Technology Data Exchange (ETDEWEB)

    1986-02-01

    Most sawmills generate more than enough wood waste to be potentially self-sufficient in both dry-kiln heat and electricity requirements. It is not generally economically viable to use conventional steam/electricty cogeneration systems at the sawmill scale of operation. As a result, Canadian sawmills are still large consumers of purchased fuels and electricity. The overall objective of this project was to develop a cost-effective wood waste-fired power generation and lumber drying system for sawmill applications. The system proposed and evaluated in this project is a wood waste-fuelled, indirectly-fired gas turbine cogeneration plant. Research, design, and development of the system has been planned to take place in a number of phases. Phase 1 consists of a preliminary engineering design and financial evaluation of the system, the subjects of this report. The results indicate that the proposed indirectly-fired gas turbine cogeneration system is both technically and financially feasible under a variety of conditions. 8 figs., 8 tabs.

  7. Preliminary seismic design of dynamically coupled structural systems

    International Nuclear Information System (INIS)

    Pal, N.; Dalcher, A.W.; Gluck, R.

    1977-01-01

    In this paper, the analysis criteria for coupling and decoupling, which are most commonly used in nuclear design practice, are briefly reviewed and a procedure outlined and demonstrated with examples. Next, a criterion judged to be practical for preliminary seismic design purposes is defined. Subsequently, a technique compatible with this criterion is suggested. A few examples are presented to test the proposed procedure for preliminary seismic design purposes. Limitations of the procedure are also discussed and finally, the more important conclusions are summarized

  8. 76 FR 6459 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13954-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  9. 76 FR 7838 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13953-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydropower, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power...

  10. Proposal of experimental facilities for studies of nuclear data and radiation engineering in the Intense Proton Accelerator Project

    CERN Document Server

    Baba, M; Nagai, Y; Ishibashi, K

    2003-01-01

    A proposal is given on the facilities and experiments in the Intense Proton Accelerator Project (J-PARC) relevant to the nuclear data and radiation engineering, nuclear astrophysics, nuclear transmutation, accelerator technology and space technology and so on. (3 refs).

  11. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  12. Preliminary Development of a Work Breakdown Structure (WBS) for Small Modular Reactors (SMRs)

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J [ORNL; Moses, Rebecca J [ORNL; Flanagan, George F [ORNL

    2014-10-01

    In summary, this preliminary WBS serves as an initial basis for the capital cost component of the economic analysis of SMRs. This preliminary WBS comes from the known WBS for existing, large nuclear power plants and develops the methodology for accounting for the anticipated differences between the current large plants and the projected SMR designs.

  13. Preliminary I&C Design for LORELEI

    International Nuclear Information System (INIS)

    Korotkin, S.; Kaufman, Y.; Guttmann, E. B.; Levy, S.; Amidan, D.; Gdalyho, B.; Cahana, T.; Ellenbogen, A.; Arad, M.; Weiss, Y.; Sasson, A.; Ferry, L.; Bourrelly, F.; Cohen, Y.

    2014-01-01

    This document summarizes the preliminary I&C design for LORELEI experiment The preliminary design deals with considerations regarding appropriate safety and service instrumentation. The determined closed loop control rules for temperature and position will be implemented in the detailed design. The Computer Aided Operator Decisions System (CAODS) will be used for prediction of hot spot temperature and thickness of oxidation layer using Baker-Just correlation. The proposed hybrid simulation system comprising of both virtual and real hardware will be in-cooperated for LORELEI verification. It will perform both integration cold tests for a partial hardware loop and virtual tests for the final I&C design

  14. Adaptive digital fringe projection technique for high dynamic range three-dimensional shape measurement.

    Science.gov (United States)

    Lin, Hui; Gao, Jian; Mei, Qing; He, Yunbo; Liu, Junxiu; Wang, Xingjin

    2016-04-04

    It is a challenge for any optical method to measure objects with a large range of reflectivity variation across the surface. Image saturation results in incorrect intensities in captured fringe pattern images, leading to phase and measurement errors. This paper presents a new adaptive digital fringe projection technique which avoids image saturation and has a high signal to noise ratio (SNR) in the three-dimensional (3-D) shape measurement of objects that has a large range of reflectivity variation across the surface. Compared to previous high dynamic range 3-D scan methods using many exposures and fringe pattern projections, which consumes a lot of time, the proposed technique uses only two preliminary steps of fringe pattern projection and image capture to generate the adapted fringe patterns, by adaptively adjusting the pixel-wise intensity of the projected fringe patterns based on the saturated pixels in the captured images of the surface being measured. For the bright regions due to high surface reflectivity and high illumination by the ambient light and surfaces interreflections, the projected intensity is reduced just to be low enough to avoid image saturation. Simultaneously, the maximum intensity of 255 is used for those dark regions with low surface reflectivity to maintain high SNR. Our experiments demonstrate that the proposed technique can achieve higher 3-D measurement accuracy across a surface with a large range of reflectivity variation.

  15. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  16. The NASA Bed Rest Project

    Science.gov (United States)

    Rhodes, Bradley; Meck, Janice

    2005-01-01

    NASA s National Vision for Space Exploration includes human travel beyond low earth orbit and the ultimate safe return of the crews. Crucial to fulfilling the vision is the successful and timely development of countermeasures for the adverse physiological effects on human systems caused by long term exposure to the microgravity environment. Limited access to in-flight resources for the foreseeable future increases NASA s reliance on ground-based analogs to simulate these effects of microgravity. The primary analog for human based research will be head-down bed rest. By this approach NASA will be able to evaluate countermeasures in large sample sizes, perform preliminary evaluations of proposed in-flight protocols and assess the utility of individual or combined strategies before flight resources are requested. In response to this critical need, NASA has created the Bed Rest Project at the Johnson Space Center. The Project establishes the infrastructure and processes to provide a long term capability for standardized domestic bed rest studies and countermeasure development. The Bed Rest Project design takes a comprehensive, interdisciplinary, integrated approach that reduces the resource overhead of one investigator for one campaign. In addition to integrating studies operationally relevant for exploration, the Project addresses other new Vision objectives, namely: 1) interagency cooperation with the NIH allows for Clinical Research Center (CRC) facility sharing to the benefit of both agencies, 2) collaboration with our International Partners expands countermeasure development opportunities for foreign and domestic investigators as well as promotes consistency in approach and results, 3) to the greatest degree possible, the Project also advances research by clinicians and academia alike to encourage return to earth benefits. This paper will describe the Project s top level goals, organization and relationship to other Exploration Vision Projects, implementation

  17. The Mixed Waste Management Facility. Preliminary design review

    International Nuclear Information System (INIS)

    1995-01-01

    This document presents information about the Mixed Waste Management Facility. Topics discussed include: cost and schedule baseline for the completion of the project; evaluation of alternative options; transportation of radioactive wastes to the facility; capital risk associated with incineration; radioactive waste processing; scaling of the pilot-scale system; waste streams to be processed; molten salt oxidation; feed preparation; initial operation to demonstrate selected technologies; floorplans; baseline revisions; preliminary design baseline; cost reduction; and project mission and milestones

  18. Colorado School of Mines low energy nuclear physics project

    International Nuclear Information System (INIS)

    Cecil, F.E.

    1993-01-01

    This report summarizes the accomplishments of the project ''Studies of nuclear reactions at very low energies''. This project was undertaken in 1987 and completed in 1993. All but one of the major objectives of this study have been accomplished. Specifically the authors have completed their investigation of the (p,γ) on light nuclei, a study of the Oppenheimer-Phillips effect, a measurements of the astrophysically interesting reaction D(α,γ) 6 Li at low energies and an extension of the reaction D(d,γ) 4 He to lower energies than previously observed. Preliminary investigation of te reaction 7 Li( 3 He,p) 9 Be was begun and is continuing under a separate DOE grant. In addition to these tasks, they have completed some very interesting projects which were not included in the original proposal. These include a study of the (d,γ) reactions on 6 Li, 7 Li and 10 B and an investigation of the possibility of observing terrestrial antineutrinos from the beta decay chains of U and Th as a diagnostic of terrestrial heat flow

  19. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  20. Preliminary Design of Aerial Spraying System for Microlight Aircraft

    Science.gov (United States)

    Omar, Zamri; Idris, Nurfazliawati; Rahim, M. Zulafif

    2017-10-01

    Undoubtedly agricultural is an important sector because it provides essential nutrients for human, and consequently is among the biggest sector for economic growth worldwide. It is crucial to ensure crops production is protected from any plant diseases and pests. Thus aerial spraying system on crops is developed to facilitate farmers to for crops pests control and it is very effective spraying method especially for large and hilly crop areas. However, the use of large aircraft for aerial spaying has a relatively high operational cost. Therefore, microlight aircraft is proposed to be used for crops aerial spraying works for several good reasons. In this paper, a preliminary design of aerial spraying system for microlight aircraft is proposed. Engineering design methodology is adopted in the development of the aerial sprayer and steps involved design are discussed thoroughly. A preliminary design for the microlight to be attached with an aerial spraying system is proposed.

  1. 75 FR 59706 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-09-28

    ... Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... on July 16, 2010, Coastal Hydropower, LLC filed an application for a preliminary permit, pursuant to... generation of the project would be 7.9 gigawatt-hours. Applicant Contact: Neil Anderson, Coastal Hydropower...

  2. Archaeological Excavation Report for Proposed Well 199-K-131 in Support of the 100-KR-4 Pump-and-Treat Project

    Energy Technology Data Exchange (ETDEWEB)

    Woody, Dave M.; Prendergast-Kennedy, Ellen L.

    2004-06-22

    An archaeological excavation was conducted at the site of proposed groundwater monitoring well 199-K-131 in support of the 100-KR-4 Pump-and-Treat Project between June 2 and 3, 2004. Excavations confirmed that there were no intact cultural deposits at the proposed well location. This report was prepared to document the findings of the test excavation.

  3. Archaeology in the Kilauea East Rift Zone: Part 2, A preliminary sample survey, Kapoho, Kamaili and Kilauea geothermal subzones, Puna District, Hawaii island

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.T.K.; Burtchard, G.C. [International Archaeological Research Inst., Inc., Honolulu, HI (United States)

    1995-05-01

    This report describes a preliminary sample inventory and offers an initial evaluation of settlement and land-use patterns for the Geothermal Resources Subzones (GRS) area, located in Puna District on the island of Hawaii. The report is the second of a two part project dealing with archaeology of the Puna GRS area -- or more generally, the Kilauea East Rift Zone. In the first phase of the project, a long-term land-use model and inventory research design was developed for the GRS area and Puna District generally. That report is available under separate cover as Archaeology in the Kilauea East Rift Zone, Part I: Land-Use Model and Research Design. The present report gives results of a limited cultural resource survey built on research design recommendations. It offers a preliminary evaluation of modeled land-use expectations and offers recommendations for continuing research into Puna`s rich cultural heritage. The present survey was conducted under the auspices of the United States Department of Energy, and subcontracted to International Archaeological Research Institute, Inc. (IARII) by Martin Marietta Energy Systems, Inc. The purpose of the archaeological work is to contribute toward the preparation of an environmental impact statement by identifying cultural materials which could be impacted through completion of the proposed Hawaii Geothermal Project.

  4. Space Elevators Preliminary Architectural View

    Science.gov (United States)

    Pullum, L.; Swan, P. A.

    Space Systems Architecture has been expanded into a process by the US Department of Defense for their large scale systems of systems development programs. This paper uses the steps in the process to establishes a framework for Space Elevator systems to be developed and provides a methodology to manage complexity. This new approach to developing a family of systems is based upon three architectural views: Operational View OV), Systems View (SV), and Technical Standards View (TV). The top level view of the process establishes the stages for the development of the first Space Elevator and is called Architectural View - 1, Overview and Summary. This paper will show the guidelines and steps of the process while focusing upon components of the Space Elevator Preliminary Architecture View. This Preliminary Architecture View is presented as a draft starting point for the Space Elevator Project.

  5. Preliminary design report for the prototypical fuel rod consolidation system

    International Nuclear Information System (INIS)

    Rosa, J.M.

    1986-01-01

    This report documents NUTECH's preliminary design of a dry, spent fuel rod consolidation system. This preliminary design is the result of Phase I of a planned four phase project. The present report on this project provides a considerable amount of detail for a preliminary design effort. The design and all of its details are described in this Preliminary Design Report (PDR). The NUTECH dry rod consolidation system described herein is remotely operated. It provides for automatic operation, but with operator hold points between key steps in the process. The operator has the ability to switch to a manual operation mode at any point in the process. The system is directed by the operator using an executive computer which controls and coordinates the operation of the in-cell equipment. The operator monitors the process using an in-cell closed circuit television (CCTV) system with audio output and equipment status displays on the computer monitor. The in-cell mechanical equipment consists of the following: (1) two overhead cranes with manipulators; (2) a multi-degree of freedom fuel handling table and its clamping equipment; (3) a fuel assembly end fitting removal station and its tools; (4) a consolidator (which pulls rods, assembles the consolidated bundle and loads the canister); (5) a canister end cap welder and weld inspection system; (6) decontamination systems; and (7) the CCTV and microphone systems

  6. The CARIPANDA project: Climate change and water resources in the Adamello Natural Park of Italy

    Science.gov (United States)

    Bocchiola, D.

    2009-04-01

    The three years (2007-2009) CARIPANDA project funded by the Cariplo Foundation of Italy is aimed to evaluate scenarios for water resources in the Adamello natural Park of Italy in a window of 50 years or so (until 2050). The project is led by Ente Parco Adamello and involves Politecnico di Milano, Università Statale di Milano, Università di Brescia, and ARPA Lombardia as scientific partners, while ENEL hydropower Company of Italy joins the project as stake holder. The Adamello Natural Park is a noteworthy resource in the Italian Alps. The Adamello Group is made of several glacierized areas (c. 24 km2), of both debris covered and free ice types, including the widest Italian Glacier, named Adamello, spreading on an area of about c. 18 km2. Also the Adamello Natural Reserve, covering 217 km2 inside the Adamello Park and including the Adamello glaciers, hosts a number of high altitude safeguarded vegetal and animal species, the safety of which is a primary task of the Reserve. Project's activity involves analysis of local climate trend, field campaigns on glaciers, hydrological modelling and remote sensing of snow and ice covered areas, aimed to build a consistent model of the present hydrological conditions and of the areas. Then, properly tailored climate change projections for the area, obtained using local data driven downscaling of climate change projections from GCMs model, are used to infer the likely response to expected climate change conditions. With two years in the project now some preliminary findings can be highlighted and some preliminary trend analysis carried out. The proposed poster provides a resume of the main results of the project insofar, of interest as a benchmark for similar ongoing and foregoing projects about climate change impact on European mountainous natural areas.

  7. Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Worthington, Monty [ORPC Alaska, LLC, Anchorage, AK (United States)

    2014-02-05

    Cook Inlet, Alaska is home to some of the greatest tidal energy resources in the U.S., as well as an endangered population of beluga whales (Delphinapterus leucas). Successfully permitting and operating a tidal power project in Cook Inlet requires a biological assessment of the potential and realized effects of the physical presence and sound footprint of tidal turbines on the distribution, relative abundance, and behavior of Cook Inlet beluga whales. ORPC Alaska, working with the Project Team—LGL Alaska Research Associates, University of Alaska Anchorage, TerraSond, and Greeneridge Science—undertook the following U.S. Department of Energy (DOE) study to characterize beluga whales in Cook Inlet – Acoustic Monitoring of Beluga Whale Interactions with the Cook Inlet Tidal Energy Project (Project). ORPC Alaska, LLC, is a wholly-owned subsidiary of Ocean Renewable Power Company, LLC, (collectively, ORPC). ORPC is a global leader in the development of hydrokinetic power systems and eco-conscious projects that harness the power of ocean and river currents to create clean, predictable renewable energy. ORPC is developing a tidal energy demonstration project in Cook Inlet at East Foreland where ORPC has a Federal Energy Regulatory Commission (FERC) preliminary permit (P-13821). The Project collected baseline data to characterize pre-deployment patterns of marine mammal distribution, relative abundance, and behavior in ORPC’s proposed deployment area at East Foreland. ORPC also completed work near Fire Island where ORPC held a FERC preliminary permit (P-12679) until March 6, 2013. Passive hydroacoustic devices (previously utilized with bowhead whales in the Beaufort Sea) were adapted for study of beluga whales to determine the relative abundance of beluga whale vocalizations within the proposed deployment areas. Hydroacoustic data collected during the Project were used to characterize the ambient acoustic environment of the project site pre-deployment to inform the

  8. The Super DREAM Project

    Energy Technology Data Exchange (ETDEWEB)

    Wigmans, Richard [Texas Tech Univ., Lubbock, TX (United States)

    2017-09-25

    Despite the fact that DOE provided only a fraction of the requested funds, the goals we defined in the proposal on which award ER41783 was based were essentially all met. This was partially due to the fact that other funding agencies, which supported our collaborators (especially from Italy and Korea) contributed as well, and partially due to the effective solutions that were developed to compensate for the fact that the detector we had proposed to build had to be scaled down. The performance of the SuperDREAM calorimeter is better than anything that has been built or proposed so far. This has of course not gone unnoticed in the scientific community. Scientists who are preparing experiments for the proposed new generation of particle accelerators (FCCee, CPEC,..) are all very seriously considering the technology developed in this project. Several new collaborations have formed which aim to adapt the dual-readout calorimeter principles to the demands of a 4 environment. Preliminary measurements using silicon photomultipliers as light sensors have already been carried out. This type of readout would make it possible to operate this detector in a magnetic field, and it would also allow for a longitudinal segmentation into electromagnetic and hadronic sections, if so desired. In addition, SiPM readout would eliminate the need for “forests” of fibers sticking out of the rear end of the calorimeter (Figure 1), and obtain an arbitrary fine lateral segmentation, which might be very important for recognizing electrons inside jets. The improvements in our understanding of the fundamental structure of matter and the forces that govern its behavior have always hinged on the availability of detectors that make it possible to explore the possibilities of new, more powerful particle accelerators to the fullest extent. We believe that the SuperDREAM project has created a quantum leap in detector technology, which may turn out to be crucially important for future discoveries in

  9. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  10. Investment Decision Support for Engineering Projects Based on Risk Correlation Analysis

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2012-01-01

    Full Text Available Investment decisions are usually made on the basis of the subjective judgments of experts subjected to the information gap during the preliminary stages of a project. As a consequence, a series of errors in risk prediction and/or decision-making will be generated leading to out of control investment and project failure. In this paper, the variable fuzzy set theory and intelligent algorithms integrated with case-based reasoning are presented. The proposed algorithm manages the numerous fuzzy concepts and variable factors of a project and also sets up the decision-making process in accordance with past cases and experiences. Furthermore, it decreases the calculation difficulty and reduces the decision-making reaction time. Three types of risk correlations combined with different characteristics of engineering projects are summarized, and each of these correlations is expounded at the project investment decision-making stage. Quantitative and qualitative change theories of variable fuzzy sets are also addressed for investment risk warning. The approach presented in this paper enables the risk analysis in a simple and intuitive manner and realizes the integration of objective and subjective risk assessments within the decision-makers' risk expectation.

  11. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN

    International Nuclear Information System (INIS)

    Silva, Eduardo de Assumpcao

    2017-01-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  12. OSU TOMF Program Site Selection and Preliminary Concept Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Spadling, Steve [Oklahoma State Univ., Stillwater, OK (United States)

    2012-05-10

    The purpose of this report is to confirm the programmatic requirements for the new facilities, identify the most appropriate project site, and develop preliminary site and building concepts that successfully address the overall project goals and site issues. These new facilities will be designed to accommodate the staff, drivers and maintenance requirements for the future mixed fleet of passenger vehicles, Transit Style Buses and School Buses.

  13. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  14. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I; FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field

  15. Macroalgae for CO2 Capture and Renewable Energy - A Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Wiley, Kristine [Gas Technology Inst., Des Plaines, IL (United States)

    2011-01-31

    The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO2) through a technology designed to capture CO2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO2/ NOx flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where the plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing

  16. Minnesota agripower project. Quarterly report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Baloun, J.

    1997-07-01

    The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

  17. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  18. Historical information on ORNL proposals for ECCS testing

    International Nuclear Information System (INIS)

    1976-01-01

    This document contains a compilation of the correspondence and preliminary report which the Oak Ridge National Laboratory submitted to the U.S. Atomic Energy Commission on the subject of in situ testing of emergency core cooling systems (ECCS) in pressurized water reactors. Most of the correspondence, which was prepared four to five years ago, deals with an ORNL proposal to evaluate the merits of conducting an in situ ECCS test in a full-scale commercial power plant. The end result of this work was to be a report in which the feasibility of conducting such an experiment would be discussed and a ''rough'' cost estimate provided. In support of this proposal, ORNL prepared a brief preliminary prospectus which identified some of the key questions that were to be addressed should the evaluation study be funded

  19. Preliminary uncertainty analysis of pre-waste-emplacement groundwater travel times for a proposed repository in basalt

    International Nuclear Information System (INIS)

    Clifton, P.M.; Arnett, R.C.

    1984-01-01

    Preliminary uncertainty analyses of pre-waste-emplacement groundwater travel times are presented for a potential high-level nuclear waste repository in the deep basalts beneath the Hanford Site, Washington State. The uncertainty analyses are carried out by means of a Monte Carlo technique, which requires the uncertain inputs to be described as either random variables or spatial stochastic processes. Pre-waste-emplacement groundwater travel times are modeled in a continuous, flat-lying basalt flow top that is assumed to overlie the repository horizon. Two-dimensional, steady state groundwater flow is assumed, and transmissivity, effective thickness, and regional hydraulic gradient are considered as uncertain inputs. Groundwater travel time distributions corresponding to three groundwater models are presented and compared. Limitations of these preliminary simulation results are discussed in detail

  20. Proposed reductions of preventable deaths in rural Indonesia through stormwater harvesting and wastewater treatment

    Directory of Open Access Journals (Sweden)

    Shane Elson

    2013-02-01

    Full Text Available Worldwide, what is responsible for killing the most children each year? AcuteRespiratory Infection (2 million children. What is second? Diarrhoea (1.8 million children. Thisstatistic does not include the additional 300,000 adults who also die from this preventable condition.Diarrhoea kills more children that malaria, HIV and measles combined (UNDP, 2006. “In most ofthe developing world, unclean water is a greater threat to human lives than violent conflict. Rightnow almost half the population of the developing world suffer from diseases because of dirty waterand inadequate sanitation” (Peace Child International, 2006. While the Millennial DevelopmentGoals (MDG and the United Nations provide an overarching view of the existing situations bycountry, the initial goal of this project is to investigating the specific existing conditions in ruralIndonesia, especially Southern Kalimantan, and how they relate to the MDG (UNDP, 2003.This will in turn allow site specific proposals in partnership with the local communities that areculturally and financially feasible. They will then be designed and constructed in conjunctionwith community education. The preliminary proposal is to use stormwater harvesting to providea clean water source in replacement of their current sources; seasonal wells, contaminated riversand swamps. In conjunction is the proposal to eliminate their exposure to open sewage throughsimple septic systems. Through these processes, the goal is to decrease the preventable cases ofsickness through increased access to clean up and decreased exposure to open sewage. This in turnwill reduce the associated deaths due to diarrhoea (WHO/UNICEF, 2009. The project is still inthe initial research and development stages as of March 2012 with the first project hoping to beundertaken by the end of 2012.

  1. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  2. {open_quotes}O{close_quotes} ring sealed process tube, Phase II, test project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.E.

    1951-04-09

    The {open_quotes}O{close_quotes} ring seal has been proposed to replace the van stone flange and the bellows thermal expansion assembly currently used on the existing Hanford piles to achieve water and gas seals, respectively. Possible advantages of the {open_quotes}O{close_quotes} ring seal are: (1) simplification of component parts and elimination of van stone corrosion; (2) simplification of maintenance; (3) lower costs of initial erection; (4) increased strength. This test supplements Test Project No. 27 (a preliminary thermal cycling test) in applying the {open_quotes}O{close_quotes} ring seal assembly to actual pile operating conditions.

  3. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  4. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  5. 77 FR 31037 - Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in...

    Science.gov (United States)

    2012-05-24

    ...; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in... of up to 2 years. This is for the purpose of processing one solar energy right-of-way (ROW) application submitted by Pacific Solar Investments, LLC, to construct and operate the Hyder Valley Solar...

  6. Preliminary study for the reactivation of a low-head hydropower scheme near Gwatt, Switzerland; Vorstudie Kleinwasserkraftwerk Schoeni, Hani bei Gwatt (Thun). Reaktivierung Niederdruck-Kraftwerk

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, B.; Meng, H.

    2000-07-01

    This final report for the Swiss Federal Office of Energy presents the results of a preliminary study on the reactivation of an old sawmill power station in the hamlet of Hani, near Gwatt in Switzerland. Details are given on the history of the installation, which dates back to 1891. The report describes the original equipment installed and discusses the ideas of the site's present owner concerning the reactivation of the power station. The legal situation as far as operational rights are concerned and the hydrological data of the site are discussed. The results of measurements made on water flow, the available water-head heights and the resulting power generation potential are presented. A project is proposed for a 58 kW turbine and estimates are presented for total yearly energy production. The report also discusses environmental and flood-protection aspects. Finally, the economics of the proposed power station are discussed and recommendations concerning the implementation of the project are made.

  7. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-23

    ... Announcing Preliminary Permit Drawing . The Commission has received three preliminary permit applications... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\3\\ The priority established by this drawing will be used to determine...

  8. 78 FR 21199 - Migratory Bird Hunting; Proposed 2013-14 Migratory Game Bird Hunting Regulations (Preliminary...

    Science.gov (United States)

    2013-04-09

    ..., Mississippi, Central, and Pacific) has a Flyway Council, a formal organization generally composed of one... Hunting Regulations (Preliminary) in this document. We published definitions of waterfowl flyways and... process must allow for public participation and an open exchange of ideas. We have developed this rule in...

  9. Teletandem between French and Brazilian students: Some preliminary remarks

    Directory of Open Access Journals (Sweden)

    Liliane SANTOS

    2015-12-01

    Full Text Available ABSTRACT In its French-Brazilian version, the Teletandem Brazil project enables students from the University of Lille 3 (France and from the State University of São Paulo (Unesp, Brazil, to take part in online exchanges, based on the principles of autonomy and reciprocity. In this work, we will present some preliminary remarks on the construction of cultural identity representations by the students who took part in the project, from 2006 to 2012, the specificity of the exchanges we analyze being that most of the French students involved in them are third generation Portuguese. We will examine the consequences of the introduction of a third culture within exchanges which, linguistically speaking, are bilateral. The French students are often experiencing conflicting feelings toward Brazil and, similarly, the Brazilian students may have conflicting feelings towards Portugal and France. Our preliminary results show that the most successful linguistic exchanges occur when students face their own cultural identity with no feeling of superiority or inferiority.

  10. An Overview of the International H2O Project (IHOP_2002) and Some Preliminary Highlights.

    Science.gov (United States)

    Weckwerth, Tammy M.; Parsons, David B.; Koch, Steven E.; Moore, James A.; Lemone, Margaret A.; Demoz, Belay B.; Flamant, Cyrille; Geerts, Bart; Wang, Junhong; Feltz, Wayne F.

    2004-02-01

    The International H2O Project (IHOP_2002) is one of the largest North American meteorological field experiments in history. From 13 May to 25 June 2002, over 250 researchers and technical staff from the United States, Germany, France, and Canada converged on the Southern Great Plains to measure water vapor and other atmospheric variables. The principal objective of IHOP_2002 is to obtain an improved characterization of the time-varying three-dimensional water vapor field and evaluate its utility in improving the understanding and prediction of convective processes. The motivation for this objective is the combination of extremely low forecast skill for warm-season rainfall and the relatively large loss of life and property from flash floods and other warm-season weather hazards. Many prior studies on convective storm forecasting have shown that water vapor is a key atmospheric variable that is insufficiently measured. Toward this goal, IHOP_2002 brought together many of the existing operational and new state-of-the-art research water vapor sensors and numerical models.The IHOP_2002 experiment comprised numerous unique aspects. These included several instruments fielded for the first time (e.g., reference radiosonde); numerous upgraded instruments (e.g., Wyo-ming Cloud Radar); the first ever horizontal-pointing water vapor differential absorption lidar (DIAL; i.e., Leandre II on the Naval Research Laboratory P-3), which required the first onboard aircraft avoidance radar; several unique combinations of sensors (e.g., multiple profiling instruments at one field site and the German water vapor DIAL and NOAA/Environmental Technology Laboratory Doppler lidar on board the German Falcon aircraft); and many logistical challenges. This article presents a summary of the motivation, goals, and experimental design of the project, illustrates some preliminary data collected, and includes discussion on some potential operational and research implications of the experiment.

  11. Thorium utilization as a Pu-burner: proposal of Plutonium-Thorium Mixed Oxide (PT-MOX) Project

    International Nuclear Information System (INIS)

    Aizawa, Otohiko

    2000-01-01

    In this paper, a Pu-Th mixed oxide (PT-MOX) project is proposed for a thorium utilization and a plutonium burning. None of plutonium can be newly produced from PT-MOX fuel, and the plutonium mass of about 1 ton can be consumed with one reactor (total heavy metal assumed: 100 tons) for 1 year. In order to consume plutonium produced from usual Light Water Reactor, it should be better to operate one PT-MOX reactor for three to five Light Water Reactors. (author)

  12. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  13. Florar Project: a forest proposal to PETROBRAS-TRANSPETRO; Projeto Florar: uma proposta florestal para a PETROBRAS-TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Melo Neto, Joao Evangelista de; Martini, Andrea Dietrich; Ozorio, Tarcisio Faria; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work presents for discussion a proposal of a forest project idealized to be implemented, in form of a linear forest, in the long of TRANSPETRO pipeway, from north to south of the country. The initial goals, restricted to the State of Sao Paulo, presume the forest fomentation of 1,000 kilometers of path, covering an area of approximately 10,000 hectares, where can be possible to realize native and exotic species plantation, considering the legal restrictions. The proposal presumes also a fund to the special nature reserve creation in the cities crossed by TRANSPETRO pipeways. The pilot proposed in this work could take place at 'Plano Diretor de Dutos de Sao Paulo', which involves 27 cities, incorporating the environmental recuperation programs from native vegetation suppression and intervention in permanent preservation area in terms of forest law. (author)

  14. Small-scale hydro power in the Anniviers Valley. Project Chippis-Ricard. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Chippis-Ricard. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant in Chippis, Switzerland. The project takes advantage of an existing irrigation scheme that deviates water from the Navisence River into two successive tunnels (total 1.8 km) and a following channel built on steep mountain sides. The basic idea of the project is to increase the flow rate entering the tunnels from 265 l/s to 1265 l/s and to lead the additional 1000 l/s to a new penstock connected to the second tunnel's outlet. In this way, a hydraulic head of 130 m could be used for power generation for over 600 households (mechanical power: 0.8 to 1.1 MW, annual electrical energy production: 2.5 to 3.6 GWh, depending on the variant considered). The report reviews the history of water use at this location and its present use as well as a feasibility study previously made. The project is described, including water collection points, conduits, the power station and the particular aspects of the joint use of water for power generation and irrigation from mid April to mid September. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  15. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  16. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  17. A preliminary survey of the genus Buchwaldoboletus (Boletales: Boletaceae)

    Science.gov (United States)

    Beatriz Ortiz-Santana; Ernst E. Both

    2011-01-01

    Buchwaldoboletus is a small genus of about a dozen species with a world-wide distribution. The boletes of this genus are non-mycorrhizal, saprophytic and lignicolous. A preliminary survey is provided and seven new combinations are proposed.

  18. A Preliminary Classification of Human Functional Sexual Disorders

    Science.gov (United States)

    Sharpe, Lawrence; And Others

    1976-01-01

    A preliminary classification is presented for functional human sexual disorders. This system is based on objective behavior and reports of distress. Five categories of sexual disorders are proposed, including the behavioral, psychological and informational components of sexual functioning in the individual and the couple. (Author)

  19. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  20. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  1. 78 FR 28780 - Proposed Flood Elevation Determinations for Beaver County, Pennsylvania (All Jurisdictions)

    Science.gov (United States)

    2013-05-16

    ...-2013-0002; Internal Agency Docket No. FEMA-B-1147] Proposed Flood Elevation Determinations for Beaver... proposed rule concerning proposed flood elevation determinations for Beaver County, Pennsylvania (All... Beaver County, Pennsylvania. Because FEMA has or will be issuing a Revised Preliminary Flood Insurance...

  2. High-performance instruments in neutron arena of JHP. Preliminary version

    International Nuclear Information System (INIS)

    Furusaka, M.; Itoh, S.; Otomo, T.; Arai, M.

    1996-05-01

    This report is a preliminary report of high-performance instruments in neutron arena of JHP (Japan Hadron Project). This report consists of as follows; neutron intensity of neutron arena, development of neutron sources in neutron arena, experimental devices and instrumentation. (J.P.N.)

  3. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  4. Projects for small hydro-power installations in the Canton of Uri, Switzerland; Kanton Uri. Projekte fuer Kleinwasserkraftwerke - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This report for the Swiss Federal Office of Energy (SFOE) on a preliminary study presents and discusses small-hydro projects at three locations in the Swiss Canton of Uri. Three of originally six potential locations were selected for further investigation. Factors such as the usable quantities of water available at the locations are discussed. The projects Brunnital, Gruonbach and Palanggenbach are discussed in detail. Water quantities and various components of the installations such as water intakes, de-sanding installations, pressure conduits, machine houses and tailrace channels are described, as is the electro-mechanical equipment proposed. Also, environmental aspects are dealt with. Annual electricity production and economic viability are further topics covered in the report.

  5. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  6. 78 FR 37217 - Ted P. Sorenson; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14519-000] Ted P. Sorenson; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 1, 2013, Ted P. Sorenson filed an application for a preliminary permit, pursuant to section 4(f) of the...

  7. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13824-000, 13826-000] FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary Permit... Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC, Project No. 13824-000. Dated: February 22...

  8. Students' Entrepreneurial Inclination at a Malaysian Polytechnic: A Preliminary Investigation

    Science.gov (United States)

    Yasin, Ahmad Yasruddin Md; Mahmood, Nik Abdul Aziz Nik; Jaafar, Nik Azyyati Nik

    2011-01-01

    This paper reports preliminary results of an ongoing project to examine students' inclination towards entrepreneurship at a Malaysian polytechnic. The study used a self-administered questionnaire to explore the influence of entrepreneurial intent, perceived behavioral control, self-efficacy, perceived barriers, perceived support factors and…

  9. Preliminary results from NOAMP deep drifting floats

    International Nuclear Information System (INIS)

    Ollitrault, M.

    1989-01-01

    This paper is a very brief and preliminary outline of first results obtained with deep SOFAR floats in the NOAMP area. The work is now going toward more precise statistical estimations of mean and variable currents, together with better tracking to resolve submesoscales and estimate diffusivities due to mesoscale and smaller scale motions. However the preliminary results confirm that the NOAMP region (and surroundings) has a deep mesoscale eddy field that is considerably more energetic that the mean field (r.m.s. velocities are of order 5 cm s -1 ), although both values are diminished compared to the western basin. A data report containing trajectories and statistics is scheduled to be published by IFREMER in the near future. The project main task is to especially study the dispersion of radioactive substances

  10. A theory of blindsight--the anatomy of the unconscious: a proposal for the koniocellular projections and intralaminar thalamus.

    Science.gov (United States)

    Vakalopoulos, Costa

    2005-01-01

    This paper extends the concepts introduced by the theory of premotor relations to unconscious cognitive mechanisms. According to the theory conscious mechanisms are associated with behavioural diversity, whereas unconscious output is proposed to have an obligatory association with stereotypical behaviour. The respective processes are by definition a function of the type of reafferent motor input. Concepts of simple and complex premotor networks are introduced as a means of describing unconscious and conscious processes, respectively. Evidence shows that unconscious cognitive performance differs qualitatively from conscious mechanisms suggesting parallel processes. Although the postulated anatomical substrates for conscious and unconscious processes will function in this model as parallel segregated networks, it is proposed they are distributed throughout the same cortical areas of the brain. Motor reafference is postulated to be mediated via pallidal projections to the thalamic reticular nucleus, which is known to modulate thalamocortical pathways. The role of the koniocellular pathway of the lateral geniculate nucleus remains an enigma and has some properties in common with the well-described magnocellular and parvocellular projections. There is also much speculation about the intralaminar and midline nuclei, the so-called non-specific thalamus. The paper will examine the distinctive features of thalamocortical networks and the role of the koniocellular pathway and intralaminar nuclei (ILN) of the thalamus and suggest that they form a neuroanatomical substrate for the categorizing of unconscious cognitive processes. The ILN has unique projections back to the basal ganglia, which could serve in constraining associated neocortical networks with stereotypical behaviour and thus putative unconscious processing. Only after establishing such a theoretical framework can one hope to successfully analyze the empirical literature on the syndrome of blindsight, of which a

  11. Environmental assessment, proposed generating station for Darlington

    International Nuclear Information System (INIS)

    1975-04-01

    This document indicates the intention of Ontario Hydro to seek approval from the Provincial Government for its plan to construct and operate a 3400 MWe nuclear generating station at the Darlington site, west of Bowmanville. This preliminary proposal also contains the environmental assessment. The environmental section of this proposal describes and assesses the existing environment and the environmental influences which would occur due to the construction and operation of a nuclear generating station, consisting of four 850 MW units, at the Darlington site. This proposed station is similar to the Bruce GS A station presently under construction. (author)

  12. Preliminary drift design analyses for nuclear waste repository in tuff

    International Nuclear Information System (INIS)

    Hardy, M.P.; Brechtel, C.E.; Goodrich, R.R.; Bauer, S.J.

    1990-01-01

    The Yucca Mountain Project (YMP) is examining the feasibility of siting a repository for high-level nuclear waste at Yucca Mountain, on and adjacent to the Nevada Test Site (NTS). The proposed repository will be excavated in the Topopah Spring Member, which is a moderately fractured, unsaturated, welded tuff. Excavation stability will be required during construction, waste emplacement, retrieval (if required), and closure to ensure worker safety. The subsurface excavations will be subject to stress changes resulting from thermal expansion of the rock mass and seismic events associated with regional tectonic activity and underground nuclear explosions (UNEs). Analyses of drift stability are required to assess the acceptable waste emplacement density, to design the drift shapes and ground support systems, and to establish schedules and cost of construction. This paper outlines the proposed methodology to assess drift stability and then focuses on an example of its application to the YMP repository drifts based on preliminary site data. Because site characterization activities have not begun, the database currently lacks the extensive site-specific field and laboratory data needed to form conclusions as to the final ground support requirements. This drift design methodology will be applied and refined as more site-specific data are generated and as analytical techniques and methodologies are verified during the site characterization process

  13. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  14. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  15. Proposal and application of an approach based on AHP and ISO/IEC 25000 to support the evaluation of the quality of project management software systems

    Directory of Open Access Journals (Sweden)

    Matheus Henrique Bartolomeu Marques Morais

    2017-06-01

    Full Text Available In the current competitive scenario, organizations are seeking to improve factors that influence the administration and the success of their projects. The adoption of a project management software suitable to organizational requirements contributes to ensure satisfactory results. In this context, this study proposes a methodology to support the quality evaluation of project management software, which is based on the AHP method (Analytic Hierarchy Process as well as on the criteria and sub-criteria of ISO/IEC 25000. The AHP method is used to define the relevance of the criteria and sub-criteria chosen. The proposed methodology was applied to an illustrative case to select the most appropriate software. The alternatives Basecamp, MS Project, Service Desk and Primavera were evaluated. Primavera and MS Project achieved the higher global performance in the process evaluation, since they fulfill 29 of 30 requirements. However, due to some particularities of the evaluated products, Primavera was selected as being the most suitable.

  16. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  17. 77 FR 31843 - Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and...

    Science.gov (United States)

    2012-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13318-002] Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On April 3, 2012, Swan Lake North Hydro, LLC, filed an application for a successive preliminary permit...

  18. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  19. 78 FR 53001 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-08-27

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  20. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  1. Preliminary design package for solar heating and hot water system

    Science.gov (United States)

    1976-01-01

    Two prototype solar heating and hot water systems for use in single-family dwellings or commercial buildings were designed. Subsystems included are: collector, storage, transport, hot water, auxiliary energy, and government-furnished site data acquisition. The systems are designed for Yosemite, California, and Pueblo, Colorado. The necessary information to evaluate the preliminary design for these solar heating and hot water systems is presented. Included are a proposed instrumentation plan, a training program, hazard analysis, preliminary design drawings, and other information about the design of the system.

  2. 77 FR 71475 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-11-30

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before April 29, 2013. FOR... the public transportation projects listed below. The actions on the projects, as well as the laws...

  3. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before January 21, 2013. FOR... the public transportation projects listed below. The actions on these projects, as well as the laws...

  4. R and D Requirements, RF Gun Mode Studies, FEL-2 Steady-State Studies, Preliminary FEL-1 Time-Dependent Studies, and Preliminary Layout Option Investigation

    International Nuclear Information System (INIS)

    Byrd, John; Corlett, John; Doolittle, Larry; Fawley, William; Lidia, Steven; Penn, Gregory; Ratti, Alex; Staples, John; Wilcox Russell; Wurtele, Jonathan; Zholents, Alexander

    2005-01-01

    This report constitutes the third deliverable of LBNLs contracted role in the FERMI (at) Elettra Technical Optimization study. It describes proposed RandD activities for the baseline design of the Technical Optimization Study, initial studies of the RF gun mode-coupling and potential effects on beam dynamics, steady-state studies of FEL-2 performance to 10 nm, preliminary studies of time-dependent FEL-1 performance using electron bunch distribution from the start-to-end studies, and a preliminary investigation of a configuration with FEL sinclined at a small angle from the line of the linac

  5. REMUS: Preliminary concept and implementation proposal

    International Nuclear Information System (INIS)

    Bustorff, U.

    1992-01-01

    In the light of the constantly increasing use of waterways, the associated risk of maritime accidents and accidental or deliberate discharge of pollutants at sea and in coastal areas, it is necessary to adopt effective pollution prevention and combating measures coordinated at national and international level so as to guarantee the safety of shipping and maintain the integrity of the maritime environment. These measures must be equally effective for accidents as for discharges of crude oil and petroleum products, chemicals, etc. so that rapid expert action can be taken in order to minimize the effects on shipping safety and on the maritime and coastal environment and also to limit consequent financial costs. This study presents a concept for increasing the effectiveness of the authorities and special agencies of the German Federal Government and coastal states which are responsible for these tasks (in particular the Operations Management Group (ELG) and the North Sea/Baltic sea Emergency Staffs (EmStaffs)) by implementing a open-quotes Computer-Based Maritime Accident Management Systemclose quotes (REMUS). The REMUS concept comprises the following two main functions for effective maritime accident management: Acquisition, storage and intelligent availability of the largest possible quantity of relevant data for accident prevention. Provision of automatic decision support, adapted to the individual situation, for use by the authorities involved during the operational phase. REMUS provides support for the maritime emergency experts in collecting data and information and generates proposals for measures to be initiated according to the prevailing circumstances. REMUS integrates perfectly, both organizationally and technically, with currently employed methods and procedures for pollution prevention

  6. ConocoPhillips Sweeny IGCC/CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Talarico; Charles Sugg; Thomas Hren; Lauri Branch; Joseph Garcia; Alan Rezigh; Michelle Pittenger; Kathleen Bower; Jonathan Philley; Michael Culligan; Jeremy Maslen; Michele Woods; Kevin Elm

    2010-06-16

    water needs. The DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

  7. Renewable energy projects in the Dominican Republic

    Energy Technology Data Exchange (ETDEWEB)

    Viani, B.

    1997-12-01

    This paper describes a US/Dominican Republic program to develop renewable energy projects in the country. The objective is to demonstrate the commercial viability of renewable energy generation projects, primarily small-scale wind and hydropower. Preliminary studies are completed for three micro-hydro projects with a total capacity of 262 kWe, and two small wind power projects for water pumping. In addition wind resource assessment is ongoing, and professional training and technical assistance to potential investors is ongoing. Projects goals include not less than ten small firms actively involved in installation of such systems by September 1998.

  8. Preliminary proposal of a Nb3Sn quadrupole model for the low β insertions of the LHC

    International Nuclear Information System (INIS)

    Ambrosio, G.; Ametrano, F.; Bellomo, G.; Broggi, F.; Rossi, L.; Volpini, G.

    1995-09-01

    In recent years Nb 3 Sn based conductors have shown wide applicability for superconducting magnets in many research areas like high field solenoids for laboratory experiment, for NMR spectroscopy and high field magnets for fusion. Nb 3 Sn technology is progressing fast, increasing both technical reliability and availability. The Nb 3 Sn technology, which has a higher critical field than NbTi, seems attractive for IR (Insertion Region) quadrupoles of large colliders . In this paper it is proposed the construction of a superconducting quadrupole wound with Nb 3 Sn cable for a second generation IR inner triplet low β quadrupoles, for the Large Hadron Collider at CERN. The low β quadrupoles, control the beam focusing at collision points, therefore a gain in term of focus strength and/or coil aperture can increase significantly machine performance. Two are the main steps for the whole project: 1) design and construction of a 1 metre long quadrupole to demonstrate the actual feasibility, which is the subject of this proposal; 2) study for integration of the quadrupole in the machine and final design of 5 m long quadrupoles finalized to the LHC

  9. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  10. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  11. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  12. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  13. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  14. Position sensitivity of the proposed segmented germanium detectors for the DESPEC project

    International Nuclear Information System (INIS)

    Khaplanov, A.; Tashenov, S.; Cederwall, B.

    2009-01-01

    The DESPEC HPGe array is a part of the NuSTAR project at FAIR, Germany. It is aimed at the spectroscopy of the stopped decaying exotic nuclei. Segmented γ-ray tracking detectors are proposed for this array in order to maximize detection efficiency and background suppression when searching for very rare events. Two types of detector modules-stacks of three 16-fold segmented planar crystals and 12- and 16-fold segmented clover detectors-have been investigated and compared from the point of view of the achievable position resolution using pulse shape analysis (PSA). To this end, detector signals from realistic γ-ray interactions have been calculated. These signals were treated by PSA in order to reconstruct the photon interaction locations. Comparing the initial interaction locations to the reconstructed ones, it was found that the double-sided strip planar detector yielded position reconstruction errors at least a factor 2 lower than the other detectors considered.

  15. The CGEM-IT of the BESIII experiment: project update and test results in magnetic field

    Science.gov (United States)

    Mezzadri, G.

    2016-08-01

    The BESIII experiment is a multi-purpose detector operating on the electron- positron collider BEPCII in Beijing. Since 2008, the world's largest sample of J/ψ, ψ’ were collected. Due to increasing luminosity, the inner drift chamber is showing signs of aging. In 2014, an upgrade was proposed by the Italian collaboration based on the Cylindrical Gas Electron Multipliers (CGEM) technology, developed within the KLOE-II experiment, but with several new features and innovations. In this contribution, an overview of the project will be presented. Preliminary results of a beam test will be shown, with particular focus on the detector performance in magnetic field, with different configurations of electric field. A new readout mode, the µTPC readout, will also be described. The project has been recognized as a Significant Research Project within the Executive Programme for Scientific and Technological Cooperation between Italy and P.R.C for the years 2013-2015, and more recently has been selected as one of the project funded by the European Commission within the call H2020- MSCA-RISE-2014.

  16. Gas cooled fast reactor 2400 MWTh, status on the conceptual design studies and preliminary safety analysis

    International Nuclear Information System (INIS)

    Malo, J.Y.; Alpy, N.; Bentivoglio, F.

    2009-01-01

    The Gas cooled Fast Reactor (GFR) is considered by the French Commissariat a l'Energie Atomique as a promising concept, combining the benefits of fast spectrum and high temperature, using Helium as coolant. A status on the GFR preliminary viability was made at the end of 2007, ending the pre-conceptual design phase. A consistent overall systems arrangement was proposed and a preliminary safety analysis based on operating transient calculations and a simplified PSA had established a global confidence in the feasibility and safety of this baseline concept. Its potential for attractive performances had been pointed out. Compare to the more mature Sodium Fast Reactor technology, no demonstrator has ever been built and the feasibility demonstration will required a longer lead time. The next main project milestone is related to the GFR viability, scheduled in 2012. The current studies consist in revisiting the reactor reference design options as selected at the end of 2007. Most of them are being consolidated by going more in depth in the analysis. Some possible alternatives are assessed. The paper will give a status on the last studies performed on the core design and corresponding neutronics and cycle performance, the Decay Heat Removal strategy and preliminary safety analysis, systems design and balance of plant... This paper is complementary to the Icapp'09 papers 9062 dealing with the Gas cooled Fast Reactor Demonstrator ALLEGRO and 9378 related to GFR transients analysis. (author)

  17. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  18. Proposal for Modified Damage Probability Distribution Functions

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup; Hansen, Peter Friis

    1996-01-01

    Immidiately following the Estonia disaster, the Nordic countries establishe a project entitled "Safety of Passenger/RoRo Vessels" As part of this project the present proposal for modified damage stability probability distribution functions has been developed. and submitted to "Sub-committee on st......Immidiately following the Estonia disaster, the Nordic countries establishe a project entitled "Safety of Passenger/RoRo Vessels" As part of this project the present proposal for modified damage stability probability distribution functions has been developed. and submitted to "Sub...

  19. Environmental assessment report on proposed Yeelirrie uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    In accordance with Government requirements, Western Mining Corporation Ltd. has prepared a Draft Environmental Impact Statement/Environmental Review and Management Programme for its proposed uranium mine development at Yeelirrie, Western Australia. This report includes an outline of the proposal, an enviromental assessment, recommendations by the Environmental Protection Authority made after consideration of the Company's draft statement and a review of public and State Government Departmental Submissions received on the Yeelirrie EIS/ERMP

  20. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  1. SolarOil Project, Phase I preliminary design report. [Solar Thermal Enhanced Oil Recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Baccaglini, G.; Bass, J.; Neill, J.; Nicolayeff, V.; Openshaw, F.

    1980-03-01

    The preliminary design of the Solar Thermal Enhanced Oil Recovery (SolarOil) Plant is described in this document. This plant is designed to demonstrate that using solar thermal energy is technically feasible and economically viable in enhanced oil recovery (EOR). The SolarOil Plant uses the fixed mirror solar concentrator (FMSC) to heat high thermal capacity oil (MCS-2046) to 322/sup 0/C (611/sup 0/F). The hot fluid is pumped from a hot oil storage tank (20 min capacity) through a once-through steam generator which produces 4.8 MPa (700 psi) steam at 80% quality. The plant net output, averaged over 24 hr/day for 365 days/yr, is equivalent to that of a 2.4 MW (8.33 x 10/sup 6/ Btu/hr) oil-fired steam generator having an 86% availability. The net plant efficiency is 57.3% at equinox noon, a 30%/yr average. The plant will be demonstrated at an oilfield site near Oildale, California.

  2. 15 CFR 917.22 - National Projects funding.

    Science.gov (United States)

    2010-01-01

    ... Projects funding proposals will be expected to address: (1) The relevance of the proposed project to a... projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed... National Projects can be up to 100 percent of the total cost of the project involved. ...

  3. Preliminary Assessment of JERS-1 SAR to Discriminating Boreal Landscape Features for the Boreal Forest Mapping Project

    Science.gov (United States)

    McDonald, Kyle; Williams, Cynthia; Podest, Erika; Chapman, Bruce

    1999-01-01

    This paper presents an overview of the JERS-1 North American Boreal Forest Mapping Project and a preliminary assessment of JERS-1 SAR imagery for application to discriminating features applicable to boreal landscape processes. The present focus of the JERS-1 North American Boreal Forest Mapping Project is the production of continental scale wintertime and summertime SAR mosaics of the North American boreal forest for distribution to the science community. As part of this effort, JERS-1 imagery has been collected over much of Alaska and Canada during the 1997-98 winter and 1998 summer seasons. To complete the mosaics, these data will be augmented with data collected during previous years. These data will be made available to the scientific community via CD ROM containing these and similar data sets compiled from companion studies of Asia and Europe. Regional landscape classification with SAR is important for the baseline information it will provide about distribution of woodlands, positions of treeline, current forest biomass, distribution of wetlands, and extent of major rivercourses. As well as setting the stage for longer term change detection, comparisons across several years provides additional baseline information about short-term landscape change. Rapid changes, including those driven by fire, permafrost heat balance, flooding, and insect outbreaks can dominate boreal systems. We examine JERS-1 imagery covering selected sites in Alaska and Canada to assess quality and applicability to such relevant ecological and hydrological issues. The data are generally of high quality and illustrate many potential applications. A texture-based classification scheme is applied to selected regions to assess the applicability of these data for distinguishing distribution of such landcover types as wetland, tundra, woodland and forested landscapes.

  4. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  5. The preliminary design and feasibility study of the spent fuel and high level waste repository in the Czech Republic

    International Nuclear Information System (INIS)

    Valvoda, Z.; Holub, J.; Kucerka, M.

    1996-01-01

    In the year 1993, began the Program of Development of the Spent Fuel and High Level Waste Repository in the Conditions of the Czech Republic. During the first phase, the basic concept and structure of the Program has been developed, and the basic design criteria and requirements were prepared. In the conditions of the Czech Republic, only an underground repository in deep geological formation is acceptable. Expected depth is between 500 to 1000 meters and as host rock will be granites. A preliminary variant design study was realized in 1994, that analyzed the radioactive waste and spent fuel flow from NPPs to the repository, various possibilities of transportation in accordance to the various concepts of spent fuel conditioning and transportation to the underground structures. Conditioning and encapsulation of spent fuel and/or radioactive waste is proposed on the repository site. Underground disposal structures are proposed at one underground floor. The repository will have reserve capacity for radioactive waste from NPPs decommissioning and for waste non acceptable to other repositories. Vertical disposal of unshielded canisters in boreholes and/or horizontal disposal of shielded canisters is studied. As the base term of the start up of the repository operation, the year 2035 has been established. From this date, a preliminary time schedule of the Project has been developed. A method of calculating leveled and discounted costs within the repository lifetime, for each of selected 5 variants, was used for economic calculations. Preliminary expected parametric costs of the repository are about 0,1 Kc ($0.004) per MWh, produced in the Czech NPPs. In 1995, the design and feasibility study has gone in more details to the technical concept of repository construction and proposed technologies, as well as to the operational phase of the repository. Paper will describe results of the 1995 design work and will present the program of the repository development in next period

  6. Assessment of compliance costs resulting from implementation of the proposed Great Lakes water quality guidance

    International Nuclear Information System (INIS)

    Fenner, K.; Podar, M.; Snyder, B.

    1993-01-01

    The primary purpose of the study was to develop an estimate of the incremental cost to direct dischargers resulting from the implementation of the proposed Great Lakes Water Quality Guidance (GLWQG). This estimate reflects the incremental cost of complying with permit requirements developed using the Implementation Procedures and water quality criteria proposed in the GLWQG versus permit requirements based on existing State water quality standards. Two secondary analyses were also performed, one to develop a preliminary estimate of the costs that would be incurred by indirect dischargers to publicly owned treatment works (POTWs), and another to evaluate the cost-effectiveness of the GLWQG. Finally, several sensitivity analyses were performed to evaluate the impact of several major assumptions on the estimated compliance costs. To estimate compliance costs, permit limitations and conditions based on existing State water quality standards were compared to water quality-based limitations and conditions based on the proposed GLWQG criteria and Implementation Procedures for a sample of plants. The control measures needed to comply with the proposed GLWQG-based effluent limitations were evaluated. Individual plant compliance costs were estimated for these control measures based on information on treatment technology and cost analyses available in the literature. An overall compliance cost was projected from the sample based on statistical methods

  7. Assessing the potential of wind energy projects. Notes for developers

    International Nuclear Information System (INIS)

    1999-11-01

    The objective of this publication is to provide some initial guidance for people who may be considering installing a wind power project. It sets out some key points which should be considered in a preliminary feasibility study and economic assessment of a project. (author)

  8. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  9. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  10. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  11. The Science benefits and preliminary design of the southern hemisphere gravitational wave detector AIGO

    Energy Technology Data Exchange (ETDEWEB)

    Blair, D G; Barriga, P; Coward, D; Dumas, J-C; Fan, Y; Gras, S; Howell, E; Ju, L; Miao, H [School of Physics, University of Western Australia, Perth, WA 6009 (Australia); Brooks, A F; Hosken, D J; Munch, J; Veitch, P J [Department of Physics, The University of Adelaide, Adelaide, SA, 5005 Australia (Australia); Charlton, P [School of Computing and Mathematics, Charles Sturt University, NSW 2678 (Australia); Galloway, D [School of Mathematical Sciences, Monash University, Vic 3800 (Australia); Hughes, S [Department of Physics, Massachusetts Institute of Technology, Cambridge, MA 02139-4307 (United States); McClelland, D E; Scott, S M; Slagmolen, B J J [Department of Physics, Australian National University, Canberra, ACT 0200 (Australia); Melatos, A [School of Physics University of Melbourne, Parkville Vic 3010 Australia (Australia)], E-mail: dgb@physics.uwa.edu.au (and others)

    2008-07-15

    The proposed southern hemisphere gravitational wave detector AIGO increases the projected average baseline of the global array of ground based gravitational wave detectors by a factor {approx}4. This allows the world array to be substantially improved. The orientation of AIGO allows much better resolution of both wave polarisations. This enables better distance estimates for inspiral events, allowing unambiguous optical identification of host galaxies for about 25% of neutron star binary inspiral events. This can allow Hubble Law estimation without optical identification of an outburst, and can also allow deep exposure imaging with electromagnetic telescopes to search for weak afterglows. This allows independent estimates of cosmological acceleration and dark energy as well as improved understanding of the physics of neutron star and black hole coalescences. This paper reviews and summarises the science benefits of AIGO and presents a preliminary conceptual design.

  12. The Science benefits and preliminary design of the southern hemisphere gravitational wave detector AIGO

    International Nuclear Information System (INIS)

    Blair, D G; Barriga, P; Coward, D; Dumas, J-C; Fan, Y; Gras, S; Howell, E; Ju, L; Miao, H; Brooks, A F; Hosken, D J; Munch, J; Veitch, P J; Charlton, P; Galloway, D; Hughes, S; McClelland, D E; Scott, S M; Slagmolen, B J J; Melatos, A

    2008-01-01

    The proposed southern hemisphere gravitational wave detector AIGO increases the projected average baseline of the global array of ground based gravitational wave detectors by a factor ∼4. This allows the world array to be substantially improved. The orientation of AIGO allows much better resolution of both wave polarisations. This enables better distance estimates for inspiral events, allowing unambiguous optical identification of host galaxies for about 25% of neutron star binary inspiral events. This can allow Hubble Law estimation without optical identification of an outburst, and can also allow deep exposure imaging with electromagnetic telescopes to search for weak afterglows. This allows independent estimates of cosmological acceleration and dark energy as well as improved understanding of the physics of neutron star and black hole coalescences. This paper reviews and summarises the science benefits of AIGO and presents a preliminary conceptual design

  13. Simplified methods and application to preliminary design of piping for elevated temperature service

    International Nuclear Information System (INIS)

    Severud, L.K.

    1975-01-01

    A number of simplified stress analysis methods and procedures that have been used on the FFTF project for preliminary design of piping operating at elevated temperatures are described. The rationale and considerations involved in developing the procedures and preliminary design guidelines are given. Applications of the simplified methods to a few FFTF pipelines are described and the success of these guidelines are measured by means of comparisons to pipeline designs that have had detailed Code type stress analyses. (U.S.)

  14. [Efficiency of computer-based documentation in long-term care--preliminary project].

    Science.gov (United States)

    Lüngen, Markus; Gerber, Andreas; Rupprecht, Christoph; Lauterbach, Karl W

    2008-06-01

    In Germany the documentation of processes in long-term care is mainly paper-based. Planning, realization and evaluation are not supported in an optimal way. In a preliminary study we evaluated the consequences of the introduction of a computer-based documentation system using handheld devices. We interviewed 16 persons before and after introducing the computer-based documentation and assessed costs for the documentation process and administration. The results show that reducing costs is likely. The job satisfaction of the personnel increased, more time could be spent for caring for the residents. We suggest further research to reach conclusive results.

  15. Heat recovery and seed recovery development project: preliminary design report (PDR)

    Energy Technology Data Exchange (ETDEWEB)

    Arkett, A. H.; Alexander, K. C.; Bolek, A. D.; Blackman, B. K.; Kurrle, P. E.; Tram, S. V.; Warren, A. M.; Ziobrowski, A. J.

    1981-06-01

    The preliminary design and performance characteristics are described of the 20 MWt heat recovery and seed recovery (HRSR) system to be fabricated, installed, and evaluated to provide a technological basis for the design of commercial size HRSR systems for coal-fired open-cycle MHD power plants. The system description and heat and material balances, equipment description and functional requirements, controls, interfacing systems, and operation and maintenance are detailed. Appendices include: (1) recommended environmental requirements for compliance with federal and state of Tennessee regulations, (2) channel and diffuser simulator, (3) equipment arrangement drawings, and (4) channel and diffuser simulator barrel drawings. (WHK)

  16. Trade-off results and preliminary designs of Near-Term Hybrid Vehicles

    Science.gov (United States)

    Sandberg, J. J.

    1980-01-01

    Phase I of the Near-Term Hybrid Vehicle Program involved the development of preliminary designs of electric/heat engine hybrid passenger vehicles. The preliminary designs were developed on the basis of mission analysis, performance specification, and design trade-off studies conducted independently by four contractors. THe resulting designs involve parallel hybrid (heat engine/electric) propulsion systems with significant variation in component selection, power train layout, and control strategy. Each of the four designs is projected by its developer as having the potential to substitute electrical energy for 40% to 70% of the petroleum fuel consumed annually by its conventional counterpart.

  17. Limited site review for the San Joaquin Nuclear Project. Project No. 499

    International Nuclear Information System (INIS)

    1977-06-01

    This report is the Nuclear Regulatory Commission's (Commission) safety evaluation of a proposed site near Bakersfield, California, on which the Los Angeles Department of Water and Power (applicant) in association with a number of other organizations proposes to build a nuclear facility at a future date. A construction permit application has not been filed but the applicant has informed us of its intention to submit an Environmental Report during February 1980 and a Preliminary Safety Analysis Report during May 1980

  18. Current Mooring Design in Partner WECs and Candidates for Preliminary Analysis

    DEFF Research Database (Denmark)

    Thomsen, Jonas Bjerg; Ferri, Francesco; Kofoed, Jens Peter

    This report is the combined report of Commercial Milestone "CM1: Design and Cost of Current Mooring Solutions of Partner WECs" and Milestone "M3: Mooring Solutions for Preliminary Analysis" of the EUDP project "Mooring Solutions for Large Wave Energy Converters". The report covers a description o...

  19. 77 FR 64586 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-10-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... actions by issuing certain approvals for the public transportation projects listed below. The actions on...

  20. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  1. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  2. Effect of preliminary oxidation on process of steel carburization

    Energy Technology Data Exchange (ETDEWEB)

    Devochkin, O V; Vorontsov, E S; Filonov, V N [Voronezhskij Politekhnicheskij Inst. (USSR)

    1975-01-01

    Effects of preliminary oxidation of the metal surface and its subsequent reduction steel cementation were studied. The samples with interferentionally coloured oxide film on the surface had deeper carbonated layer than those without film. The kinetics of carbonation process and the mechanism proposed for this phenomenon are given.

  3. Licensing support system preliminary needs analysis: Volume 1

    International Nuclear Information System (INIS)

    1989-01-01

    This Preliminary Needs Analysis, together with the Preliminary Data Scope Analysis (next in this series of reports), is a first effort under the LSS Design and Implementation Contract toward developing a sound requirements foundation for subsequent design work. Further refinements must be made before requirements can be specified in sufficient detail to provide a basis for suitably specific system specifications. This preliminary analysis of the LSS requirements has been divided into a ''needs'' and a ''data scope'' portion only for project management and scheduling reasons. The Preliminary Data Scope Analysis will address all issues concerning the content and size of the LSS data base; providing the requirements basis for data acquisition, cataloging and storage sizing specifications. This report addresses all other requirements for the LSS. The LSS consists of both computer subsystems and non-computer archives. This study addresses only the computer subsystems, focusing on the Access Subsystems. After providing background on previous LSS-related work, this report summarizes the findings from previous examinations of needs and describes a number of other requirements that have an impact on the LSS. The results of interviews conducted for this report are then described and analyzed. The final section of the report brings all of the key findings together and describes how these needs analyses will continue to be refined and utilized in on-going design activities. 14 refs., 2 figs., 1 tab

  4. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  5. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  6. Liberalism, Communitarianism and the Project of Self | van der ...

    African Journals Online (AJOL)

    In this article the authors seek to conceptualize a dynamic and inclusive understanding of personal identity within multicultural democracies such as South Africa, which will draw on both the liberal and communitarian traditions' respect for the project of self. A preliminary lay out for such a project emerges from a literature ...

  7. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  8. Table - Impacts of the Proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems

    Science.gov (United States)

    This table shows the impacts of the proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems, both with and without the Cross-State Air Pollution Rule.

  9. Proposal and Development of a High Voltage Variable Frequency Alternating Current Power System for Hybrid Electric Aircraft

    Science.gov (United States)

    Sadey, David J.; Taylor, Linda M.; Beach, Raymond F.

    2017-01-01

    The development of ultra-efficient commercial vehicles and the transition to low-carbon emission propulsion are seen as strategic thrust paths within NASA Aeronautics. A critical enabler to these paths comes in the form of hybrid electric propulsion systems. For megawatt-class systems, the best power system topology for these hybrid electric propulsion systems is debatable. Current proposals within NASA and the Aero community suggest using a combination of alternating current (AC) and direct current (DC) for power generation, transmission, and distribution. This paper proposes an alternative to the current thought model through the use of a primarily high voltage AC power system, supported by the Convergent Aeronautics Solutions (CAS) Project. This system relies heavily on the use of doubly-fed induction machines (DFIMs), which provide high power densities, minimal power conversion, and variable speed operation. The paper presents background on the activity along with the system architecture, development status, and preliminary results.

  10. Preliminary analysis of alternative fuel cycles for proliferation evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Steindler, M. J.; Ripfel, H. C.F.; Rainey, R. H.

    1977-01-01

    The ERDA Division of Nuclear Research and Applications proposed 67 nuclear fuel cycles for assessment as to their nonproliferation potential. The object of the assessment was to determine which fuel cycles pose inherently low risk for nuclear weapon proliferation while retaining the major benefits of nuclear energy. This report is a preliminary analysis of these fuel cycles to develop the fuel-recycle data that will complement reactor data, environmental data, and political considerations, which must be included in the overall evaluation. This report presents the preliminary evaluations from ANL, HEDL, ORNL, and SRL and is the basis for a continuing in-depth study. (DLC)

  11. Preliminary evaluation of crisis-relocation fallout-shelter options. Volume 2. Detailed analysis

    International Nuclear Information System (INIS)

    Santini, D.J.; Clinch, J.M.; Davis, F.H.; Hill, L.G.; Lynch, E.P.; Tanzman, E.A.; Wernette, D.R.

    1982-12-01

    This report presents a preliminary, detailed evaluation of various shelter options for use if the President orders crisis relocation of the US urban population because of strong expectation of a nuclear war. The availability of livable shelter space at 40 ft 2 per person (congregate-care space) by state is evaluated. Options are evaluated for construction of fallout shelters allowing 10 ft 2 per person - such shelters are designed to provide 100% survival at projected levels of radioactive fallout. The FEMA concept of upgrading existing buildings to act as fallout shelters can, in principle, provide adequate shelter throughout most of the US. Exceptions are noted and remedies proposed. In terms of upgrading existing buildings to fallout shelter status, great benefits are possible by turning away from a standard national approach and adopting a more site-specific approach. Existing FEMA research provides a solid foundation for successful crisis relocation planning, but the program can be refined by making suitable modifications in its locational, engineering, and institutionally specific elements

  12. Notification: Preliminary Research on EPA's Design for the Environment Product Labeling Program OIG

    Science.gov (United States)

    Project #OPE-FY14-4012, November 06, 2013. The Office of Inspector General (OIG) is starting preliminary research on the U.S. Environmental Protection Agency’s (EPA’s) Design for the Environment (DfE) Product Labeling Program.

  13. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  14. Fast liner proposal

    International Nuclear Information System (INIS)

    Sherwood, A.R.; Freeman, B.L.; Gerwin, R.A.; Jarboe, T.R.; Krakowski, R.A.; Malone, R.C.; Marshall, J.; Miller, R.L.; Suydam, B.

    1977-08-01

    This is a proposal to study, both theoretically and experimentally, the possibility of making a fusion reactor by magnetically imploding a cylindrical metallic shell on a prepared plasma. The approach is characterized by the following features: (1) the nonrotating liner would be driven by an axial current, (2) the plasma would also carry an axial current that provides an azimuthal magnetic field for thermal insulation in both the radial and longitudinal directions, (3) solid end plugs would be utilized to prevent axial loss of particles, and (4) liner speeds would be in the 10 6 cm/s range. The preliminary calculations indicate (1) that the energetics are favorable (energy inputs of about 10 MJ might produce a machine in the break-even regime), (2) that radiation and heat losses could be made tolerable, (3) that alpha-particle heating could be made very effective, and (4) that Taylor instabilities in a fast liner might be harmless because of the large viscosities at high pressures. A preliminary conceptual design of the sort of fusion reactor that might result from such an approach is discussed, as are some of the relevant reactor scaling arguments

  15. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  16. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  17. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  18. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  19. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  20. Preliminary design of GDT-based 14 MeV neutron source

    International Nuclear Information System (INIS)

    Du Hongfei; Chen Dehong; Wang Hui; Wang Fuqiong; Jiang Jieqiong; Wu Yican; Chen Yiping

    2012-01-01

    To meet the need of D-T fusion neutron source for fusion material testing, design goals were presented in this paper according to the international requirements of neutron source for fusion material testing. A preliminary design scheme of GDT-based 14 MeV neutron source was proposed, and a physics model of the neutron source was built based on progress of GDT experiments. Two preliminary design schemes (i. e. FDS-GDT1, FDS-GDT2) were designed; among which FDS-GDT2 can be used for fusion material testing with neutron first wall loading of 2 MW/m 2 . (authors)

  1. Preliminary reports on fiscal 2000 results of project for subsidizing international joint research; 2000 nendo kokusai kyodo kenkyu josei jigyo seika hokoku kai yokoshu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    This paper presents preliminary reports on fiscal 2000 results of project for subsidizing international joint research sponsored by NEDO. For international joint research teams doing excellent studies, their research expenses are subsidized, thereby promoting international research exchange, enhancing international level of industrial technology and contributing to the formation of basis for innovative industrial technology. The projects relating to the global environmental field are implemented jointly with RITE. The contents of the report to be published are, in the global environmental field (practicability study), development of oil substitute resources, reproducible resources, and technologies for producing polymeric and plastic materials benign to the earth by microorganism using carbon dioxide. In the substance/material field, the contents of the report are innovative production and device application of tunable photonic crystals using electronic penetration network; development of new synthesis process of innovative nitride, creation and theoretical calculation of electromagnetic function; studies on quantum transportation in superconductor and semiconductor bonding structures; and studies on quantum liquid and solid, and application to materials science and technology. (NEDO)

  2. Preliminary proposal of a Nb{sub 3}Sn quadrupole model for the low {beta} insertions of the LHC

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, G; Ametrano, F; Bellomo, G; Broggi, F; Rossi, L; Volpini, G [Milan Univ. (Italy). Dip. di Fisica; [INFN, Sezione di Milano (Italy). Laboratorio Acceleratori e Superconduttivita` Applicata

    1995-09-01

    In recent years Nb{sub 3}Sn based conductors have shown wide applicability for superconducting magnets in many research areas like high field solenoids for laboratory experiment, for NMR spectroscopy and high field magnets for fusion. Nb{sub 3}Sn technology is progressing fast, increasing both technical reliability and availability. The Nb{sub 3}Sn technology, which has a higher critical field than NbTi, seems attractive for IR (Insertion Region) quadrupoles of large colliders . In this paper it is proposed the construction of a superconducting quadrupole wound with Nb{sub 3}Sn cable for a second generation IR inner triplet low {beta} quadrupoles, for the Large Hadron Collider at CERN. The low {beta} quadrupoles, control the beam focusing at collision points, therefore a gain in term of focus strength and/or coil aperture can increase significantly machine performance. Two are the main steps for the whole project: (1) design and construction of a 1 metre long quadrupole to demonstrate the actual feasibility, which is the subject of this proposal; (2) study for integration of the quadrupole in the machine and final design of 5 m long quadrupoles finalized to the LHC.

  3. Preliminary Results on Asymptotic Stabilization of Hamiltonian Systems with Nonholonomic Constraints

    NARCIS (Netherlands)

    Khennouf, H.; Canudas de Wit, C.; Schaft, A.J. van der

    1995-01-01

    This paper presents some preliminary results on asymptotic stabilization of nonholonomic mechanical systems using the Hamiltonian formulation proposed previously. Our work seeks to establish a general formulation for designing time-varying controllers for some mechanical system described in the

  4. Review of Interactive Video--Romanian Project Proposal

    Science.gov (United States)

    Onita, Mihai; Petan, Sorin; Vasiu, Radu

    2016-01-01

    In the recent years, the globalization and massification of video education offer involved more and more eLearning scenarios within universities. This article refers to interactive video and proposes an overview of it. We analyze the background information, regarding the eLearning campus used in virtual universities around the world, the MOOC…

  5. Proposal for a project agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2001-01-01

    This document concerns a project agreement with the ISTC entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medecine and Pharmacology" to be executed in co-operation with the Crystal Clear Collaboration. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a project agreement with ISTC for a total amount of 775 000 US dollars. The European Union party in ISTC will co-fund the project up to a total of 525 000 US dollars. CERN's contribution will not exceed 250 000 US dollars. At the present rate of exchange this is equivalent to approximately 430 000 Swiss francs

  6. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  7. High School Geography Project. Legacy for the Seventies. An Analysis of the High School Geography Project in Relation to New Developments in Geographic Education Worldwide.

    Science.gov (United States)

    Gunn, Angus M., Ed.

    Nine articles by geographers and educators analyze the High School Geography Project (HSGP). A project overview by Angus Gunn presents essential ideas and content of six units and several preliminary reactions. The question of "HSGP exportability" to France and Germany is examined in articles by Maurice Saint-Yves and Robert Geipel…

  8. Solar electricity power station building. A preliminary project investigation for “PIRIN TEX LTD.” – Gotze Delchgev using

    International Nuclear Information System (INIS)

    Kolev, Boyko; Todorieva, Vanja

    2009-01-01

    The total solar energy absorbed by Earth's atmosphere, oceans and land masses is approximately 3,850,000 exa joules (EJ=1018 J) per year. In 2005, this was more energy in one hour than the world used in one year. Photosynthesis captures approximately 3,000 EJ per year in biomass. The amount of solar energy reaching the surface of the planet is so vast that in one year it is about twice as much as will ever be obtained from all of the Earth's non-renewable resources of coal, oil, natural gas, and mined uranium combined. Natural gas crisis such as this from January 2009 in Bulgaria turn into the best investments the development of technology for renewable energy sources using especially solar energy using for electricity production and water heating. The aims of this article are: To develop a preliminary project for solar electricity power station build-ing; To estimate the profits of solar energy used for electricity production and water heating. Keywords: renewable energy sources, solar energy accumulation, solar electricity power station, natural gas crisis

  9. The Bioinformatics of Integrative Medical Insights: Proposals for an International Psycho-Social and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International Psycho-Social and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  10. The Bioinformatics of Integrative Medical Insights: Proposals for an International PsychoSocial and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International PsychoSocial and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  11. Preliminary GRS Measurement of Chlorine Distribution on Surface of Mars

    Science.gov (United States)

    Keller, J. M.; Boynton, W. V.; Taylor, G. J.; Hamara, D.; Janes, D. M.; Kerry, K.

    2003-12-01

    Ongoing measurements with the Gamma Ray Spectrometer (GRS) aboard Mars Odyssey provide preliminary detection of chlorine at the surface of Mars. Summing all data since boom deployment and using a forward calculation model, we estimate values for chlorine concentration at 5° resolution. Rebinning this data and smoothing with a 15-degree-radius boxcar filter reveal regions of noticeable chlorine enrichment at scales larger than the original 5° resolution and allow for preliminary comparison with previous Mars datasets. Analyzing chlorine concentrations within 30 degrees of the equator, we find a negative correlation with thermal inertia (R2=0.55) and positive correlation with albedo (R2=0.52), indicating that chlorine is associated with fine, non-rock surface materials. Although possibly a smoothing artifact, the spatial correlation is more noticeable in the region covering Tharsis and Amazonis than around Arabia and Elysium. Additionally, a noticeable region of chlorine enrichment appears west of Tharsis Montes ( ˜0 to 20N, ˜110 to 150W) and chlorine concentration is estimated to vary in the equatorial region by over a factor of two. A simplified two-component model involving chlorine-poor rocks and a homogenous chlorine-rich fine material requires rock abundance to vary from zero to over 50%, a result inconsistent with previous measurements and models. In addition to variations in rock composition and distribution, substantial variations in chlorine content of various types of fine materials including dust, sand, and duricrust appear important in explaining this preliminary observation. Surprisingly, visual comparison of surface units mapped by Christensen and Moore (1992) does not show enrichment in chlorine associated with regions of indurated surfaces, where cementation has been proposed. Rather, Tharsis, a region of active deposition with proposed mantling of 0.1 to 2 meters of recent dust (Christensen 1986), shows the greatest chlorine signal. In light of

  12. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  13. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  14. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  15. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  16. 3D virtual character reconstruction from projections: a NURBS-based approach

    Science.gov (United States)

    Triki, Olfa; Zaharia, Titus B.; Preteux, Francoise J.

    2004-05-01

    This work has been carried out within the framework of the industrial project, so-called TOON, supported by the French government. TOON aims at developing tools for automating the traditional 2D cartoon content production. This paper presents preliminary results of the TOON platform. The proposed methodology concerns the issues of 2D/3D reconstruction from a limited number of drawn projections, and 2D/3D manipulation/deformation/refinement of virtual characters. Specifically, we show that the NURBS-based modeling approach developed here offers a well-suited framework for generating deformable 3D virtual characters from incomplete 2D information. Furthermore, crucial functionalities such as animation and non-rigid deformation can be also efficiently handled and solved. Note that user interaction is enabled exclusively in 2D by achieving a multiview constraint specification method. This is fully consistent and compliant with the cartoon creator traditional practice and makes it possible to avoid the use of 3D modeling software packages which are generally complex to manipulate.

  17. Training project on Radiological Protection in medicine. Use of new technologies

    International Nuclear Information System (INIS)

    Ruis-Cruces, R.; Perez-Martinez, M.; Pastor Vega, J. M.; Diez de los Rios Delgado, A.

    2003-01-01

    Radiological protection training addressed to physicians should start during the teaching graduate and postgraduate studies, and a third phase only for those physicians using X rays and radioactive sources in diagnosis and treatment of diseases. To show a training project addressed to the teaching graduate students based on the new technologies, such as web online and interactive CD-ROM. Development of a web-online including information in.pdf (adobe acrobat) format and additional tools (as data bases, videos, news and class meetings, FAQ, tutorials). Moreover, we propose to development an interactive CD-ROM which will be used as a practical tool to complete the obligatory subject on radiological protection in the University of Malaga (Spain). We show the preliminary phase of the project. The web-online is being developed with the Microsoft FrontPage software. The first version of the CR-ROM is being developed in html format. These tools based on new technologies will be a very important support for radiological protection training, which is recommended by International Organizations (EC Report R116 and IAE Action Plan 2002-2006). (Author) 4 refs

  18. Preliminary safety assessment and preliminary safety report for the treated radwaste store, Winfrith

    International Nuclear Information System (INIS)

    Staples, A.T.

    1992-06-01

    It is the purpose of this assessment to define the categorisation of the Treated Radwaste Store, TRS, B55 at the Winfrith Technology Centre. Its further purpose is to cover all relevant sections required for a Preliminary Safety Report (PSR) encompassing the TRS and the integral Quality Assessment Unit (QUA). The TRS is designed for the interim storage of intermediate level radioactive wastes. All waste material stored in the TRS will be contained within 500 litre stainless steel drums acceptable to NIREX. It is proposed that the TRS will receive 500 litre stainless steel NIREX drums containing either irradiated DRAGON fuel or encapsulated sludge waste. (author)

  19. ICT and UD: Preliminary Study for Recommendations to Design Accessible University Courses.

    Science.gov (United States)

    Pagliara, Silvio Marcello; Sánchez Utgé, Marta; De Anna, Lucia

    2017-01-01

    Starting from the Universal Design in the educational context principles, the experiences gained during the FIRB project "Net@ccessibility" and the high-education courses for teachers' specialization on special education, this research will focus on preliminary studies in order to define the recommendations for designing accessible university courses.

  20. Preliminary safety assessment of the WIPP facility

    International Nuclear Information System (INIS)

    Balestri, R.J.; Torres, B.W.; Pahwa, S.B.; Brannen, J.P.

    1979-01-01

    This paper summarizes the efforts to perform a safety assessment of the Waste Isolation Pilot Plant (WIPP) facility being proposed for southeastern New Mexico. This preliminary safety assessment is limited to a consequence assessment in terms of the dose to a maximally exposed individual as a result of introducing the radionuclides into the biosphere. The extremely low doses to the organs as a result of the liquid breach scenarios are contrasted with the background radiation

  1. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    Science.gov (United States)

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-01-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning,…

  2. Preliminary radiological assessments of low-level waste repositories

    International Nuclear Information System (INIS)

    Nancarrow, D.J.; Sumerling, T.J.; Ashton, J.

    1988-06-01

    Preliminary assessments of the post-closure radiological impact from the disposal of low-level radioactive wastes in shallow engineered facilities at four sites are presented. This provides a framework to practice and refine a methodology that could be used, on behalf of the Department, for independent assessment of any similar proposal from Nirex. Information and methodological improvements that would be required are identified. (author)

  3. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  4. Communication dated 22 September 2008 received from the Permanent Mission of Germany to the Agency regarding the German proposal on a Multilateral Enrichment Sanctuary Project

    International Nuclear Information System (INIS)

    2008-01-01

    The Secretariat has received a communication dated 22 September 2008 from the Permanent Mission of Germany, forwarding a paper outlining the German proposal on 'the Multilateral Enrichment Sanctuary Project (MESP)'. As requested in the communication, the paper, entitled 'the Multilateral Enrichment Sanctuary Project (MESP) - a Fresh Look at Ensuring Nuclear Fuel Supply' is circulated herewith for the information of Member States

  5. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  6. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  7. Preliminary Examination of the Supply and Demand Balance for Renewable Electricity

    Energy Technology Data Exchange (ETDEWEB)

    Swezey, B.; Aabakken, J.; Bird, L.

    2007-10-01

    In recent years, the demand for renewable electricity has accelerated as a consequence of state and federal policies and the growth of voluntary green power purchase markets, along with the generally improving economics of renewable energy development. This paper reports on a preliminary examination of the supply and demand balance for renewable electricity in the United States, with a focus on renewable energy projects that meet the generally accepted definition of "new" for voluntary market purposes, i.e., projects installed on or after January 1, 1997. After estimating current supply and demand, this paper presents projections of the supply and demand balance out to 2010 and describe a number of key market uncertainties.

  8. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  9. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  10. Borehole plugging of man-made accesses to a basalt repository: a preliminary study

    International Nuclear Information System (INIS)

    Taylor, C.L.; Anttonen, G.J.; O'Rourke, J.E.; Niccum, M.R.

    1979-09-01

    This report describes the status of work currently in progress for the Basalt Borehole Plugging Program (BBPP). The primary objectives of the BBPP outlined in this report have been met during this first phase of work. These objectives included: (1) the preparation of a preliminary list of candidate plug materials; (2) a description of available machinery capable of placing candidate plug materials; and (3) the development of physical and geochemical testing programs to help evaluate the chemical stability and physical properties of candidate plug materials. The most significant finding from work to date is that given reasonable regulatory criteria, nothing has been identified which would prevent design of a plug system to seal manmade openings leading to a nuclear waste repository in Columbia River basalt for significantly long periods of time (on the order of thousands of years). Work accomplished to date indicates that this plug system can be designed using both natural and manufactured materials and can be emplaced with existing placement machinery and modifications of that machinery. The objectives of Task II are to conduct laboratory tests to evaluate the suitability of preferred candidate materials for plugging boreholes in the proposed repository, select plug system(s), initiate preconceptual machinery design for the placement of materials in plug system(s), and prepare a preliminary Task II report. As with Task I project organization, Task II is divided into subtasks that are identified by written subtask work summaries

  11. Cost Finding Principles and Procedures. Preliminary Field Review Edition. Technical Report 26.

    Science.gov (United States)

    Ziemer, Gordon; And Others

    This report is part of the Larger Cost Finding Principles Project designed to develop a uniform set of standards, definitions, and alternative procedures that will use accounting and statistical data to find the full cost of resources utilized in the process of producing institutional outputs. This technical report describes preliminary procedures…

  12. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  13. Sniffer project development

    CERN Document Server

    Grau, S; CERN. Geneva. ST Division

    2002-01-01

    To ensure the safety of the personnel, and prevent major damage to the equipment in the LHC experiments, a combined fire and gas detection system is being developed in conjunction with the industry. This system named SNIFFER, shall detect fire, flammable gas leaks and oxygen deficiency. In addition it shall interface with the Experiments' Control System and the CERN Safety Alarm Monitoring system. The SNIFFER project is currently at the end of the prototyping phase, and the technical specification is being written for the outsourcing of the system. The purpose of this document is to describe the main functions, constraints and interfaces of the system, to present the status report and planning of the project, and to explain the preliminary conclusions of the prototyping phase.

  14. Preliminary Design Analysis of a HGD for the NHDD Program at Korea

    International Nuclear Information System (INIS)

    Song, Kee Nam; Lee, H. Y.; Lee, S. B.; Kim, Y. W.

    2007-01-01

    Korea Atomic Energy Research Institute is in the process of carrying out a Nuclear Hydrogen Development and Demonstration (NHDD) Program by considering the indirect cycle gas cooled reactors that produce heat at temperatures in the order of 950 .deg. C. A coaxial double-tube Hot Gas Duct (HGD) is a key component connecting the reactor pressure vessel and the intermediate heat exchanger for the NHDD program. Recently, a preliminary design evaluation for the hot gas duct of the NHDD program was carried out. These preliminary design activities include a decision on the geometric dimensions, a strength evaluation, an appropriate material selection, and identifying the design code for the HGD. In this study, a preliminary strength evaluation for the HGD of the NHDD program has been undertaken based on the HTR-10 design concepts. Also, a preliminary evaluation of the creep-fatigue damage for a high temperature HGD structure has been carried out according to the draft code case for Alloy 617. Preliminary strength evaluation results for the HGD showed that the geometric dimensions of the proposed HGD would be acceptable for the design requirements

  15. NCSS Peace Studies Project: An Interim Report.

    Science.gov (United States)

    Ferber, Michael

    This preliminary report of a National Council for the Social Studies (NCSS) project briefly assesses teaching materials related to peace and nuclear warfare. Covering elementary, secondary, and higher education, the materials discussed present a variety of activities, decision-making approaches, and analytical assessments of policies of many…

  16. Characterization of the Human Proteomic Response to Hydrocodone: A Preliminary Study

    Science.gov (United States)

    2014-05-01

    Bjork, S.J. Grant , Does traumatic brain injury increase risk for substance abuse?, J Neurotrauma (2009). [13] D.P. Graham, A.L. Cardon , An update on...Preliminary Study” 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-11-2-0126 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Lt Col Vikhyat Bebarta, MD 5d. PROJECT

  17. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  18. Mid-Columbia coho reintroduction feasibility project. Preliminary environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC's Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan

  19. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  20. Baseline comparison report for Project W-058, Replacement of the cross-site transfer system. Revision 1

    International Nuclear Information System (INIS)

    Mendoza, D.P.

    1995-01-01

    This BCR compares the Project W-058 Functional Design Criteria with the Project W-058 Preliminary Design Requirements Document, and identifies the differences between the two documents in the mission definition, project requirements, system functions, and interfaces. Impacts these differences have on current project design are also discussed

  1. Projected impacts of federal tax policy proposals on mortality burden in the United States: A microsimulation analysis.

    Science.gov (United States)

    Kim, Daniel

    2018-06-01

    The public health consequences of federal income tax policies that influence income inequality are not well understood. I aimed to project the impacts on mortality of modifying federal income tax structures based on proposals by two recent United States (U.S.) Presidential candidates: Donald Trump and Senator Bernie Sanders. I performed a microsimulation analysis using the latest U.S. Internal Revenue Service public-use tax file with state identifiers (2008 tax year), containing nationally-representative data from 139,651 tax returns. I considered five tax plan scenarios: 1) actual 2008 tax structures; proposals in 2016 by then-candidates 2) Trump and 3) Sanders; 4) a modified Sanders plan with higher top tax rates (75%); and 5) a modified Sanders plan with higher top rates plus revenue redistribution to lower-income households (Trump and Sanders plans, respectively. Under the modified Sanders plan including higher top rates, 68,919 (95% CI: 25,221-113,561) fewer deaths/year are projected. Under the modified Sanders plan with redistribution, 333,504 (95% CI: 192,897-473,787) fewer deaths/year are expected. Policies that both raise federal income tax rates and redistribute tax revenue could confer large reductions in the total number of annual deaths among Americans. In this era of high income inequality and growing public support to address the rich-poor gap, policymakers should consider joint federal tax and redistributive policies as levers to reduce the burden of mortality in the United States. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  2. The ability to manage self-proposed projects between 1;3 and 2;0 years old: a study of inhibition and resistance to interference

    OpenAIRE

    Estanislao Pastor-Mallol; Edith Santó-Rañé

    2015-01-01

    This study examines very young children's ability to manage self-proposed projects by using the inhibitory function and resistance to interference. In a natural environment and using an observational method, we conducted a longitudinal study of a sample observed at 1;3, 1;6, 1;9 and 2;0 years old. The research was divided into two studies which followed different procedures and looked at the projects carried out, the interferences produced and the functioning of inhibition. We observed signif...

  3. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  4. 78 FR 42027 - Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements

    Science.gov (United States)

    2013-07-15

    ... Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements AGENCY: Employee... illustrations given to participants in defined contribution pension plans, such as 401(k) and 403(b) plans. The... Labor, 200 Constitution Avenue NW., Washington, DC 20210, Attention: Pension Benefit Statements Project...

  5. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  6. Development and preliminary experimental study on micro-stacked insulator

    International Nuclear Information System (INIS)

    Ren Chengyan; Yuan Weiqun; Zhang Dongdong; Yan Ping; Wang Jue

    2009-01-01

    High gradient insulating technology is one of the key technologies in new type dielectric wall accelerator(DWA). High gradient insulator, namely micro-stacked insulator, was developed and preliminary experimental study was done. Based on the finite element and particle simulating method, surface electric field distribution and electron movement track of micro-stacked insulator were numerated, and then the optimized design proposal was put forward. Using high temperature laminated method, we developed micro-stacked insulator samples which uses exhaustive fluorinated ethylene propylene(FEP) as dielectric layer and stainless steel as metal layer. Preliminary experiment of vacuum surface flashover in nanosecond pulse voltage was done and micro-stacked insulator exhibited favorable vacuum surface flashover performance with flashover field strength of near 180 kV/cm. (authors)

  7. Preliminary High-Throughput Metagenome Assembly

    Energy Technology Data Exchange (ETDEWEB)

    Dusheyko, Serge; Furman, Craig; Pangilinan, Jasmyn; Shapiro, Harris; Tu, Hank

    2007-03-26

    Metagenome data sets present a qualitatively different assembly problem than traditional single-organism whole-genome shotgun (WGS) assembly. The unique aspects of such projects include the presence of a potentially large number of distinct organisms and their representation in the data set at widely different fractions. In addition, multiple closely related strains could be present, which would be difficult to assemble separately. Failure to take these issues into account can result in poor assemblies that either jumble together different strains or which fail to yield useful results. The DOE Joint Genome Institute has sequenced a number of metagenomic projects and plans to considerably increase this number in the coming year. As a result, the JGI has a need for high-throughput tools and techniques for handling metagenome projects. We present the techniques developed to handle metagenome assemblies in a high-throughput environment. This includes a streamlined assembly wrapper, based on the JGI?s in-house WGS assembler, Jazz. It also includes the selection of sensible defaults targeted for metagenome data sets, as well as quality control automation for cleaning up the raw results. While analysis is ongoing, we will discuss preliminary assessments of the quality of the assembly results (http://fames.jgi-psf.org).

  8. Ecological economics - a special perspective? Preliminary reflections

    DEFF Research Database (Denmark)

    Røpke, Inge

    2002-01-01

    This paper reports on some preliminary reflections from a research project concerning ecological economics as a special perspective. As Clive Spash noted in a presentation at the ESEE conference in Cambridge, July 2001, ecological economics has reached the age of puberty, looks into the glass...... and searches its own identity. The identity seeking processes are visible in the large number of publications discussing the characteristics of ecological economics as well as the similarities to and differences from environmental economics. The present paper is a part of this stream. The paper is work...

  9. Preliminary AD-Horn Thermomechanical and Electrodynamic Simulations

    CERN Document Server

    AUTHOR|(CDS)2095747; Horvath, David; Calviani, Marco

    2016-01-01

    As part of the Antiproton Decelerator (AD) target area consolidation activities planned for LS2, it has been necessary to perform a comprehensive study of the thermo-structural behaviour of the AD magnetic horn during operation, in order to detail specific requirements for the upgrade projects and testing procedures. The present work illustrates the preliminary results of the finite element analysis carried out to evaluate the thermal and structural behaviour of the device, as well as the methodology used to model and solve the thermomechanical and electrodynamic simulations performed in the AD magnetic horn.

  10. VALUES-ORIENTED PROJECT MANAGEMENT OF RENEWABLE ENERGY

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2017-03-01

    Full Text Available The value-oriented approach to project management of renewable energy based on classification stage of the life cycle of products of the projects, adapted to the goals and objectives of information modeling, which allowed to formulate stricter requirements information models used at different stages of the power plant is proposed. A classification of the alternative energy projects, which highlighting areas for activities is proposed. The list of stakeholders that have an impact on alternative energy projects and presented their classification is defined. The value of alternative energy projects considered from the standpoint of a utilitarian approach, using the concept of utility and on the basis of this concept proposed classification values of alternative energy projects. Criteria values as indicators for assessing the value of alternative energy projects and their weights determined by pairwise comparison. To take into account the changes of the value criteria over time proposed to use the key control points value, assessed value criteria in various key points of control, defined indicator of the total value of alternative energy projects. The classification of risks and tools for value-oriented risk management in alternative energy projects is proposed. Further study authors plan to link the development of mechanisms for harmonization value alternative energy projects for their stakeholders.

  11. Towards understanding household-level forest reliance in Cambodia - study sites, methods, and preliminary findings

    DEFF Research Database (Denmark)

    Ra, Koy; Pichdara, Lonn; Dararath, Yem

    There is growing international interest in the role of forests in poverty prevention and reduction. In consequence, this broad area of investigation has been subject to increased research; one major international research project is that facilitated by the Poverty Environment Network (PEN). This ......). This project covers a large number of sites in 26 countries throughout the tropics. The present report contains contextual details, methodological information and preliminary findings for the PEN sites in Cambodia....

  12. 76 FR 1619 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2011-01-11

    ... SACWIS Assessment Reviews, at any time in the system life cycle. Submission of the SACWIS SARG and other...-0159] Proposed Information Collection Activity; Comment Request Proposed Projects Title: Statewide... the project, as described in the approved Advance Planning Document, have been adequately completed...

  13. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  14. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  15. 78 FR 20133 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Bull Mountain Unit...

    Science.gov (United States)

    2013-04-03

    ... associated pads, access roads, gas and water pipelines, screw compressors and overhead electric lines. This... projected air quality impacts. The project was initially scoped from October 29 to December 12, 2008, for 55..., the BLM has identified the following preliminary issues: Air quality; water quality and supply...

  16. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

  17. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  18. The VIRGO project

    International Nuclear Information System (INIS)

    Yvert, M.

    1991-01-01

    The detection of gravitational waves is, nowadays, technologically possible. The Virgo project, proposed by a French-Italian collaboration, is now on the verge of being fully approved and funded. The goal of the Virgo project is, first, to detect gravitational waves. The next will be to perform, in conjunction with other similar detectors, more precise measurements (i.e. the spin of the graviton) and start gravitational wave astrophysical observations. The method is proposed to use a large Michelson interferometer as a detector. The main motivations, characteristics and expected sensitivity of this project are described. (R.P.) 14 refs., 6 figs

  19. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  20. A proposed programme for energy risk research

    International Nuclear Information System (INIS)

    1979-01-01

    The report consists of two parts. Part I presents an overview of technological risk management, noting major contributions and current research needs. Part II details a proposed program of energy research, including discussions of some seven recommended projects. The proposed energy risk research program addresses two basic problem areas: improving the management of energy risks and energy risk communication and public response. Specific recommended projects are given for each. (Auth.)