  1. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  2. SNF sludge treatment system preliminary project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    Flament, T.A.

    1998-03-03

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS.

  3. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  4. Yakima/Klickitat Production Project Preliminary Design Report, Appendix A: Refined Project Goals and Harvest Managment Plan : Experimental Design Plan : Genetic Risk Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    Yakima Indian Nation; Pacific Northwest Laboratory; Washington Department of Fisheries

    1990-03-01

    The purpose of the project as stated by the Northwest Power Planning Council is 'to test the assumption that new artificial production in the Yakima and Klickitat subbasins can be used to increase harvest and enhance natural production while maintaining genetic resources.'

  5. 谈建筑安装工程前期策划%Discussion on the preliminary planning of construction and installation project

    Institute of Scientific and Technical Information of China (English)

    李芳

    2014-01-01

    主要从建筑安装承包方的角度,阐述了在建筑安装工程项目实施全过程中进行前期策划的重要性和必要性,对策划的方法与重点内容进行了详细的说明,促使建筑安装工程前期策划更为科学合理。%Mainly from the angle of construction installation contractor, this paper elaborated the importance and necessity of preliminary plan-ning in construction and installation engineering project implementation process, explained in detail the planning methods and important con-tents, promoted the preliminary planning more scientific and reasonable of construction and installation project.

  6. Preliminary Planning and Process Control of Railway Engineering Project%浅谈铁路工程项目前期策划及过程控制

    Institute of Scientific and Technical Information of China (English)

    刘佰川

    2016-01-01

    在铁路项目建设的整个周期,如何能保持或达到策划测算的经济目标,如何实施项目全过程控制,使项目施工全过程在预定的轨道上运行,项目的前期策划及过程控制就显得尤为重要。%In the whole cycle of railway construction projects, how to maintain or achieve the economic targets and implement the project whole process control to make the whole process of the project construction in the scheduled track running, the preliminary planning and process control of the project are particularly important.

  7. SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

    Energy Technology Data Exchange (ETDEWEB)

    RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

    2010-10-22

    This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics

  8. SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

    Energy Technology Data Exchange (ETDEWEB)

    RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

    2010-10-22

    This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics

  9. Overview about project planning

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2012-12-01

    Full Text Available The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide developed by the Project Management Institute (PMI in 2008. According to this edition of PMBOK, project planning involves a group of processes required to establish the scope of the project, refine the objectives, and define the actions that must be undertaken to attain the objectives of the project.

  10. Project Planning: An Analysis

    Directory of Open Access Journals (Sweden)

    Dr.S.S.Riaz Ahamed

    2010-01-01

    Full Text Available The purpose of the Planning stage is to analyze the project in terms of work breakdown, cost, resources, and timing. At the end of this stage all team members should be clear on the sub tasks and deliverables with the project, the time constraints they are working too and the roles and responsibilities that are expected from them.Software Project Plan defines what the work is, and how this work can be completed. This plan is developed at the beginning of the software project and is continually refined and improved as the work rocesses. It can be useful to management as a frame work for review and control the process of developing the software. Additionally, the Software Project Plan can define each of the major tasks and estimate the time and resources that are required to complete these tasks.

  11. Preliminary Planning in Construction of Engineering Projects%浅谈建设工程项目的施工前期策划

    Institute of Scientific and Technical Information of China (English)

    吴利科; 杜建钢

    2011-01-01

    With the booming of management method of turnkey contracting in construction area, the contractor's focus has turned from construction management into multi-management of engineering, procurement, construction and testing, facing the increasing management difficulty and risk. Therefore setting clear objectives and plans, identifying implementing risks and making insuring measures at the beginning of the implementation of contract can make sure the project develop toward the established goals effectively. This article narrate the role of preliminary planning in construction, and briefly state the thread of making the preliminary planning in construction by taking the example of turnkey contracting in hydraulic engineering.%随着建筑施工行业总承包管理模式的发展,施工承包商也相应从单一的施工管理转变为涉及设计、施工、采购、调试等多方面的管理,管理难度和风险加大.因此,在合同实施伊始进行施工前期策划,确定管理目标,理顺工作思路,辨识实施风险,制定保证措施,可以有效控制各项管理任务按照既定目标推进.文章叙述了施工前期策划在工程管理中的作用,并以水工总承包工程为例浅述了施工前期策划的编制思路.

  12. EUPORIAS: plans and preliminary results

    Science.gov (United States)

    Buontempo, C.

    2013-12-01

    Recent advances in our understanding and ability to forecast climate variability have meant that skilful predictions are beginning to be routinely made on seasonal to decadal (s2d) timescales. Such forecasts have the potential to be of great value to a wide range of decision-making, where outcomes are strongly influenced by variations in the climate. In 2012 the European Commission funded EUPORIAS, a four year long project to develop prototype end-to-end climate impact prediction services operating on a seasonal to decadal timescale, and assess their value in informing decision-making. EUPORIAS commenced on 1 November 2012, coordinated by the UK Met Office leading a consortium of 24 organisations representing world-class European climate research and climate service centres, expertise in impacts assessments and seasonal predictions, two United Nations agencies, specialists in new media, and commercial companies in climate-vulnerable sectors such as energy, water and tourism. The poster describes the setup of the project, its main outcome and some of the very preliminary results.

  13. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  14. Factors for implementation of development projects with an emphasis on preliminary estimates project (Case Study flagship project of Ilam

    Directory of Open Access Journals (Sweden)

    Abdollahian Vahed

    2016-12-01

    Full Text Available Without a doubt optimum performance is possible in the context of a planned development project organized failure to comply with a standard patterndoes not guarantee when a project based on financial forecasts and with the required quality. in this study, based on the standards of project management enumerating the factors for implementation of a project the study is the flagship project of Ilam and finally the implementation of the project as stated in the standard are investigated. in this research project emphasizing the preliminary estimates (estimates and time and workload has been considered and compared to the existing. according to the research findings in 83 percent of projects, project was not according to preliminary financial estimates. 100% of projects have been wrong to predict the time and projects have progressed according to preliminary forecast and in 66 percent of projects supporting private sector investment and hinder the progress of the project is appropriate and the project framework was unchanged.

  15. Preliminary rock mechanics laboratory: Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Oschman, K.P.; Hummeldorf, R.G.; Hume, H.R.; Karakouzian, M.; Vakili, J.E.

    1987-01-01

    This document presents the rationale for rock mechanics laboratory testing (including the supporting analysis and numerical modeling) planned for the site characterization of a nuclear waste repository in salt. This plan first identifies what information is required for regulatory and design purposes, and then presents the rationale for the testing that satisfies the required information needs. A preliminary estimate of the minimum sampling requirements for rock laboratory testing during site characterization is also presented. Periodic revision of this document is planned.

  16. Preliminary Design Report for the Yakima/Klickitat Production Project.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration

    1990-04-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Task 1. Agreement on a refined statement of project goals. Task 2. Completion of a technical analysis of water supplies. Task 3. Completion of an experimental design plan. Task 4. Development of a harvest management plan. Task 5. Assessment of potential genetic risks. Task 6. Project coordination with all other affected parties. Task 7. Submission of a preliminary design report to the Council. Task 8. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  17. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  18. Preliminary project proposal : Missouri chutes, NE & IA

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This proposal is for the Missouri Chutes National Wildlife Refuge that would be in Nebraska and Iowa on the Missouri River. This preliminary project proposal focuses...

  19. DIGITAL ARCHITECTURE PROJECT PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  20. Material Stabilization Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SPEER, D.R.

    1999-09-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  1. Project Surveillance and Maintenance Plan. [UMTRA Project

    Energy Technology Data Exchange (ETDEWEB)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  2. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  3. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social...... mobilization the utopian aspects of John Friedmann's work are discussed together with the forces of social development, that must be counted on to make the utopian visions and radical planninge materialize. Finally, the role of radical planner is considered....

  4. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...... mobilization the utopian aspects of John Friedmann's work are discussed together with the forces of social development, that must be counted on to make the utopian visions and radical planninge materialize. Finally, the role of radical planner is considered....

  5. HANDI 2000 project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-09-09

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00, Rev. 11, by integrating the major Hanford business processes and their supporting information systems.

  6. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections......This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  7. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  8. Project Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    1999-03-22

    Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of

  9. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  10. SNF Project Engineering Process Improvement Plan

    Energy Technology Data Exchange (ETDEWEB)

    DESAI, S.P.

    2000-02-09

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities.

  11. Development of integrated software project planning model

    OpenAIRE

    Manalif, Ekananta; Capretz, Luiz Fernando; Ho, Danny

    2012-01-01

    As the most uncertain and complex project when compared to other types of projects, software development project is highly depend on the result of software project planning phase that helping project managers by predicting the project demands with respect to the budgeting, scheduling, and the allocation of resources. The two main activities in software project planning are effort estimation and risk assessment which has to be executed together because the accuracy of the effort estimation is ...

  12. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  13. Advanced Life Support Project Plan

    Science.gov (United States)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  14. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  15. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  16. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  17. Project Plan Remote Target Fabrication Refurbishment Project

    Energy Technology Data Exchange (ETDEWEB)

    Bell, Gary L [ORNL; Taylor, Robin D [ORNL

    2009-08-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and

  18. LSHTM Data Management Plan for research projects

    OpenAIRE

    Knight, G

    2017-01-01

    A Data Management Plan is a planning document that outlines the decisions made on how data will be created, managed and used during a project. This document provides a template for use when planning data management activities in your research. Completed plans should be emailed to for comment.

  19. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  20. Project X Accelerator R&D Plan

    Energy Technology Data Exchange (ETDEWEB)

    2008-01-31

    .4 seconds, producing approximately 2.3 MW of beam power at 120 GeV. At lower proton energies Main Injector cycle times can be shorter, allowing a beam power above 2 MW in the range of proton energy between 60 GeV and 120 GeV. In parallel, because the loading of the Recycler only requires 0.6 seconds, up to four linac cycles are available for accumulation and distribution of 8 GeV protons from the Recycler. Total available 8 GeV beam power lies in the range of 100-200 kW, depending on the energy in the Main Injector. Primary modifications to the existing accelerator complex to support Project X include integration of an H{sup -} injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. The purpose of this document is to describe an R&D plan that would position the U.S. to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). Included are design, technical development, project documentation, and organizational goals. These are described in the context of an overall set of performance goals for Project X. (2) R&D Plan Elements - Describes the essential technical elements of the plan, including major subsystem

  1. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  2. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  3. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  4. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  5. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ... TRANSPORTATION Federal Highway Administration Major Project Financial Plan Guidance AGENCY: Federal Highway... Major Project Financial Plan Guidance outlining the procedures the FHWA will follow when reviewing and approving Financial Plans. The proposed Major Project Financial Plan Guidance incorporates changes required...

  6. Sustainable Building through Project Planning Process

    Directory of Open Access Journals (Sweden)

    Anuar Alias

    2014-10-01

    Full Text Available Planning process has a significant impact on the ability of a construction project to success. This is the stage where the detailed directions are given which would affect thewhole course of the project. The process is argued to be the most crucial stage which the principles of sustainability are integrated throughout the whole life of building. The purpose of this research was to investigate the Malaysian building project stakeholders’ perspectives on the most significant strategies to integrate sustainability principles into thewhole life of building through the project planning process. From the review of available literatures, there are 21 strategies to integrate sustainability principles during a building project planning process have been unveiled. A total of 357 Malaysian project stakeholderswho have been directly involved in sustainable building project and/or the stakeholders who are judged to be knowledgeable on the project were selected to be contributed for questionnaire survey. The collected data were analyzed using cronbach’s alpha measurement to assess their internal reliability, and frequency and descriptive analysis tomeasure the relative importance of the factors. The result shows that all the 21 strategies (the factors to integrate sustainability during a project planning process were identified by the respondents to be very crucial to be implemented throughout the planning process ofa sustainable building project in Malaysia. This paper offers ideas and recommendations on the sustainability integration strategies to be practiced throughout the project planningprocess towards delivering a successful sustainable building project. The concept is very useful to be a starting point for the development of a practical ‘Sustainability IntegrationFramework’ during the planning process of a sustainable building project in the future.Keywords: Sustainable Building Project; Construction Project; Project Planning Process

  7. Preliminary Design Report for the Yakima/Klickitat Production Project; Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration.

    1990-03-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Agreement on a refined statement of project goals. Completion of a technical analysis of water supplies. Completion of an experimental design plan. Development of a harvest management plan. Assessment of potential genetic risks. Project coordination with all other affected parties. Submission of a preliminary design report to the Council. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  8. Uranium Mill Tailings Remedial Action Project surface project management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  9. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  10. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

  11. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  12. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  13. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  14. Knowledge-based planning for construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Zozaya-Gorostiza, C.A.

    1988-01-01

    This study investigates the development of knowledge-based computer tools that assist an engineer during the construction planning process. A knowledge-based expert-system architecture which provides means for representing and using project planning knowledge is described. This architecture, called PLANEX, has been used for developing three prototype knowledge-based systems for construction, excavation, and manufacturing project planning. One of these prototypes, called CONSTRUCTION PLANEX, assists in the planning for the excavation and structural erection of concrete and steel buildings. This system uses construction planning knowledge to generate project activity networks, recommend appropriate construction technologies, estimate durations and costs and prepare project schedules. CONSTRUCTION PLANEX has been applied in laboratory simulations in three ways: interactively as an intelligent assistant, independently as an automated planner, and as part of an integrated building design environment. Example applications have ranged from two to twenty stories. The development of the PLANEX architecture and the CONSTRUCTION PLANEX system produced contributions in several research areas.

  15. SNF project engineering process improvement plan

    Energy Technology Data Exchange (ETDEWEB)

    KELMENSON, R.L.

    1999-05-24

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999.

  16. Life sciences space biology project planning

    Science.gov (United States)

    Primeaux, G.; Newkirk, K.; Miller, L.; Lewis, G.; Michaud, R.

    1988-01-01

    The Life Sciences Space Biology (LSSB) research will explore the effect of microgravity on humans, including the physiological, clinical, and sociological implications of space flight and the readaptations upon return to earth. Physiological anomalies from past U.S. space flights will be used in planning the LSSB project.The planning effort integrates science and engineering. Other goals of the LSSB project include the provision of macroscopic view of the earth's biosphere, and the development of spinoff technology for application on earth.

  17. Peculiarities of project planning in tourism

    Directory of Open Access Journals (Sweden)

    Milena Filipova

    2010-02-01

    Full Text Available The dynamic changes in the environment, in which the tourism companies work, make it necessary to search for a situational solution of a series of innovation tasks and for an introduction of new projects not described in details in the strategic or operative plan of the tourism company. Along with the periodic planning project teams are established with competences covering (and limited to the solution of individual, we would rather say, many times unique problems.

  18. Preliminary low-level waste feed staging plan

    Energy Technology Data Exchange (ETDEWEB)

    Certa, P.J.

    1996-02-05

    A Preliminary Low-Level Waste Feed Staging Plan was prepared. The plan supports the Phase I privatization effort by providing recommendations that may influence the technical content of the final request for proposal, and the interface control documents for the turnover of two double-shell tanks (DST) to the private contractors for use as feed tanks and the transfer of supernate to these tanks. Additionally, the preliminary schedule of feed staging activities will be useful to both RL and the private bidders during the contract negotiation period. A revised feed staging plan will be issued in August 1996 reflecting anticipated changes in the request for proposal, resolution of issues identified in this report, and completion of additional work scope.

  19. Preliminary aspects of a qualitative research projection

    Directory of Open Access Journals (Sweden)

    Simona Haidau

    2012-12-01

    Full Text Available In this paper are presented preliminary aspects on the design of of qualitative research achieved by nongovernmental organizations in the North-East of Romȃnia. The research aims to identify attitudes, opinions and behaviors to nongovernmental organizations to implement public relations programs and campaigns.

  20. Dynamic and stochastic multi-project planning

    CERN Document Server

    Melchiors, Philipp

    2015-01-01

    This book deals with dynamic and stochastic methods for multi-project planning. Based on the idea of using queueing networks for the analysis of dynamic-stochastic multi-project environments this book addresses two problems: detailed scheduling of project activities, and integrated order acceptance and capacity planning. In an extensive simulation study, the book thoroughly investigates existing scheduling policies. To obtain optimal and near optimal scheduling policies new models and algorithms are proposed based on the theory of Markov decision processes and Approximate Dynamic programming.

  1. National Security Technology Incubation Project Continuation Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  2. SAPHIRE 8 Software Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Curtis L.Smith; Ted S. Wood

    2010-03-01

    This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

  3. Fiscal year 1981 US corn and soybeans pilot preliminary experiment plan, phase 1

    Science.gov (United States)

    Livingston, G. P.; Nedelman, K. S.; Norwood, D. F.; Smith, J. H. (Principal Investigator)

    1981-01-01

    A draft of the preliminary experiment plan for the foreign commodity production forecasting project fiscal year 1981 is presented. This draft plan includes: definition of the phase 1 and 2 U.S. pilot objectives; the proposed experiment design to evaluate crop calendar, area estimation, and area aggregation components for corn and soybean technologies using 1978/1979 crop-year data; a description of individual sensitivity evaluations of the baseline corn and soybean segment classification procedure; and technology and data assessment in support of the corn and soybean estimation technology for use in the U.S. central corn belt.

  4. Recent Development and Preliminary Results of Chinese Meridian Project

    Institute of Scientific and Technical Information of China (English)

    WANG Chi; REN Liwen

    2013-01-01

    The Meridian Project is a ground-based network program to monitor solar-terrestrial space environment,which consists of a chain of 15 ground-based observatories located roughly along 120°E longitude and 30°N latitude.The Meridian project started in 2008,and its construction was completed by 2011.The integration and test phase of the Meridian Project conducted in 2011 demonstrated its observation capabilities as expected.The project will be in full operation in 2012.This report gives an overview of the recent development and preliminary results of the Meridian Project since 2010.

  5. Project implementation plan: ASTD remote deployment

    Energy Technology Data Exchange (ETDEWEB)

    CRASS, D.W.

    1999-08-18

    This Project Implementation Plan (PIP) shall be the controlling document for the Accelerated Site Technology Deployment (ASTD) supported project to procure and qualify a remote/robotic work platform for large hot cell deactivation in the 324 Building B-Cell. This plan will be integrated into the 324/327 Buildings Stabilization/Deactivation Project, Project Management Plan, (HNF-IP-1289, Rev. 1) and shall comply with the base requirements established in that document. This PIP establishes the baseline and defines the scope, schedule, budget, organizational responsibilities, reporting requirements, deliverables, and end points for the implementation of new technology into B-Cell. This shall include procurement, safety, quality assurance, training, documentation, record management, and facility modifications applicable to this project. Specifically this plan controls and executes the procurement and acceptance, qualification, and turnover of a remote/robotic work platform for 324 Building B-Cell. This includes the development of functional parameters, performance requirements, evaluation criteria, procurement specifications, acceptance and qualification test procedures, training requirements, and turnover responsibilities. The 324/237 Buildings Stabilization/Deactivation Project is currently in its second year of a nine-year project to complete deactivation and closure of the facility for long-term surveillance and maintenance. A major obstacles for the project is the inability to effectively perform deactivation tasks within high radioactively contaminated hot cells. The current strategies utilize inefficient and resource intensive technologies that significantly impact the cost and schedule for stabilization and deactivation. The ASTD Remote Deployment Project shall identify, procure, and turnover, to the B-Cell project, a remote/robot work platform to improve B-Cell cleanup productivity and enhance worker safety and health.

  6. FY95 software project management plan: TMACS, CASS computer systems

    Energy Technology Data Exchange (ETDEWEB)

    Spurling, D.G.

    1994-11-11

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule.

  7. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  8. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  9. Energy Strategic Planning & Sufficiency Project

    Energy Technology Data Exchange (ETDEWEB)

    Retziaff, Greg

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  10. Breckinridge Project, initial effort. Report VI. Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  11. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  12. UMTRA Project environmental, health, and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs.

  13. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  14. Planning and commitment in cultural heritage projects

    NARCIS (Netherlands)

    Baarveld, Marlijn; Smit, Marnix; Dewulf, Geert P.M.R.

    2013-01-01

    Purpose – The purpose of the study is to generate insights into the planning process for reusing cultural heritage within urban redevelopment projects and identifies barriers to and drivers for stakeholder commitment. Design/methodology/approach – Characteristics of five Dutch urban redevelopment

  15. Planning and commitment in cultural heritage projects

    NARCIS (Netherlands)

    Baarveld, Marlijn; Smit, Marnix; Dewulf, Geert P.M.R.

    2013-01-01

    Purpose – The purpose of the study is to generate insights into the planning process for reusing cultural heritage within urban redevelopment projects and identifies barriers to and drivers for stakeholder commitment. Design/methodology/approach – Characteristics of five Dutch urban redevelopment pr

  16. Planning and commitment in cultural heritage projects

    NARCIS (Netherlands)

    Baarveld, M.Y.; Smit, M.; Dewulf, G.P.M.R.

    2013-01-01

    Purpose – The purpose of the study is to generate insights into the planning process for reusing cultural heritage within urban redevelopment projects and identifies barriers to and drivers for stakeholder commitment. Design/methodology/approach – Characteristics of five Dutch urban redevelopment

  17. National Ignition Facility project acquisition plan

    Energy Technology Data Exchange (ETDEWEB)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  18. Subjective risk assessment for planning conservation projects

    Science.gov (United States)

    Game, Edward T.; Fitzsimons, James A.; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-12-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner.

  19. 14 CFR 152.109 - Project eligibility: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...

  20. Minimal Technologies Application Project: Planning and installation

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  1. New construction of the Kelchbach hydropower installation - Preliminary project; Vorprojekt Neubau Kraftwerk Kelchbach. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Kalbermatten, J.

    2009-09-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes the preliminary project for the new construction of a small hydropower installation on the Kelchbach stream in Naters, Switzerland. After a pressure-pipe rupture, the old, over 100 year-old installation was closed down. The replacement installation is planned to increase power production. The works necessary for the realisation of this hydropower project are described and discussed. Several older studies on the replacement of the installation are listed. Three variants are presented and discussed as are hydrological data on the project. Cost estimates are presented and discussed. Estimates of energy production are also presented and discussed, as is the economic viability of the project. Environmental aspects of the project are also examined.

  2. Policy and planning for large infrastructure projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2005-01-01

    is massive cost overruns, benefit shortfalls, and waste. Second, the paper explores the causes of misinformation and finds that political-economic explanations best account for the available evidence: planners and promoters deliberately misrepresent costs, benefits, and risks in order to increase...... the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning...

  3. 77 FR 23242 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-04-18

    ... the Banks Lake Pumped Storage Project (Banks Lake Project or project) to be located on Banks Lake and... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... December 1, 2011, the Grand Coulee Project Hydroelectric Authority filed an application for a preliminary...

  4. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    Energy Technology Data Exchange (ETDEWEB)

    Conner, J.C.

    1994-10-18

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue.

  5. Tank Waste Remediation System Projects Document Control Plan

    Energy Technology Data Exchange (ETDEWEB)

    Slater, G.D.; Halverson, T.G.

    1994-09-30

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project.

  6. Preliminary decommissioning plan for Clab (Central interim storage for spent fuels); Preliminaer avvecklingsplan foer Clab

    Energy Technology Data Exchange (ETDEWEB)

    Gatter, Patrik; Wikstroem, Nina [SWECO, Stockholm (Sweden); Hallberg, Bengt [Studsvik Nuclear AB, Nykoeping (Sweden)

    2005-12-15

    In the The Swedish Radiation Protection Authority's Regulations SSI FS 2002:04 and The Swedish Nuclear Power Inspectorate's Regulations SKI FS 2004:1 it is stated that the owner of a nuclear facility must have a preliminary plan for decommissioning of the plant. The present report is a preliminary plan for decommissioning the Central interim storage for spent fuels (Clab). Clab will be decommissioned when all spent fuels and reactor core components have been sent to final disposal. The time for the decommissioning is dependent on the time for phasing out the last Swedish nuclear reactor. At present it is thought that Clab will remain in operation until after year 2050. During the work with this project, nothing has been found that indicates that decommissioning Clab could be more complicated than other plants whose decommissioning is closer in time. On the contrary, smaller radiation doses to the personnel are expected, as well as limited amounts of low and medium activity waste. This plan will be updated and more detailed as the time for decommissioning approaches.

  7. 77 FR 41782 - City of Quincy; FFP Project 110, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2012-07-16

    ... Energy Regulatory Commission City of Quincy; FFP Project 110, LLC; Notice of Competing Preliminary Permit... May 1, 2012, City of Quincy and FFP Project 110, LLC filed preliminary permit applications pursuant to... 62301; (217) 228-4500. FFP Project 110, LLC's proposed project would consist of: (1) Fourteen new...

  8. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  9. Business plan: A preliminary approach to an unknown genre

    Directory of Open Access Journals (Sweden)

    Federico Navarro

    2015-11-01

    Full Text Available The business plan has been widely included in the curricula of economics degrees and is key to business practice worldwide, but has not been studied from a socio-discursive perspective yet due to restrictions in its social, spatial, and temporal circulation. Based on interviews and a qualitative analysis of a corpus of 38 texts written in Spanish, I aim to provide a preliminary description of the genre. Results indicate that a chain of four phases is associated to a continuum of social settings organized through entrepreneurial/corporate and expert/training variables; its rhetorical structure includes “describing present/potential situation of the company and market” and “describing future processes of strategic actions regarding the marketing, production, and financial plans”. This analysis offers methodological innovations to account for occluded genres, encourages the contrastive study of the business plan in different cultural and linguistic environments, and assists business teachers with a situated picture of the genre

  10. Single Shell Tank (SST) Interim Stabilization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  11. Linear-programming-based heuristics for project capacity planning

    NARCIS (Netherlands)

    Gademann, Noud; Schutten, Johannes M.J.

    2005-01-01

    Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi-project organization is capacity planning. By capacity planning, we mean the problem of matching demand for

  12. 77 FR 41781 - City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2012-07-16

    ... Energy Regulatory Commission City of Quincy; FFP Project 109, LLC; Notice of Competing Preliminary Permit... May 1, 2012, City of Quincy and FFP Project 109, LLC filed preliminary permit applications pursuant to...: Mr. Charles Bevelheimer, 730 Maine Street, Quincy, IL 62301; (217) 228-4500. FFP Project 109,...

  13. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  14. Business System Planning Project System Requirements Specification

    Energy Technology Data Exchange (ETDEWEB)

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  15. South Bay Salt Ponds Restoration Project : Final Data Acquisition Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document provides the Data Acquisition Plan for the South Bay Salt Pond Restoration Project. The purpose of the Data Acquisition Plan is to guide the collection...

  16. National Ignition Facility project acquisition plan revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  17. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and...

  18. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    Energy Technology Data Exchange (ETDEWEB)

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A. [Sandia National Labs., Albuquerque, NM (United States). Intelligent Systems and Robotics Center

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The project considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.

  19. QA program plan plutonium stabilization and handling project W-460

    Energy Technology Data Exchange (ETDEWEB)

    SCHULTZ, J.W.

    1999-09-02

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  20. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  1. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Science.gov (United States)

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  2. Project Plan Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    Energy Technology Data Exchange (ETDEWEB)

    BARTLETT, W.D.

    1999-09-14

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev.0. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation.

  3. Definition study for an extended manned test of a regenerative life support system, preliminary test plan

    Science.gov (United States)

    1971-01-01

    A preliminary plan and procedure are presented for conducting an extended manned test program for a regenerative life support system. Emphasis will be placed on elements associated with long-term system operation and long-term uninterrupted crew confinement.

  4. Preliminary results on the cryogenic target for FIREX project

    Science.gov (United States)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-06-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (˜ 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H{2} liquefaction using a dummy target instead of the foam target.

  5. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    .... This therapeutic area (TA) Project Plan will be the primary document for guiding all major aspects of... Project Plan will be the primary document for guiding all major aspects of FDA's multi-year initiative to... submit either electronic comments regarding this document to http://www.regulations.gov or written...

  6. 7 CFR 1250.314 - Plans and projects.

    Science.gov (United States)

    2010-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE EGG RESEARCH AND PROMOTION Egg Research and Promotion Order Definitions § 1250.314 Plans and projects. Plans and projects means those research, consumer and producer education, advertising, marketing, product development, and promotion...

  7. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Mill Town Power Project; Notice of Preliminary Permit Application Accepted..., 2011, Mill Town Power Project filed an application for a preliminary permit, pursuant to section...

  8. Physical activity in solid organ transplant recipients: organizational aspects and preliminary results of the Italian project.

    Science.gov (United States)

    Roi, G S; Stefoni, S; Mosconi, G; Brugin, E; Burra, P; Ermolao, A; Granito, M; Macini, P; Mastrosimone, S; Nacchia, F; Pegoraro, C; Rigotti, P; Sella, G; Sgarzi, S; Tamè, M R; Totti, V; Trerotola, M; Tripi, F; Nanni Costa, A

    2014-09-01

    Most of the difficulties when trying to realize the proposal to prescribe physical activity for transplantation patients come from patient attitudes and cultural beliefs that ignore the benefits of exercise, but there also are organizational aspects arising from the difficulties that these patients face in accessing supervised exercise facilities. To address these difficulties, the Italian study project "Transplant … and Now Sport" was developed based on a model of cooperation among transplantation specialists, sports physicians, and exercise specialists organized as a team combining their specific skills to effectively actuate the physical exercise programs. This preliminary report is based on 26 patients (16 male, 10 female; 47.8±10.0 years old; 21 kidney and 5 liver transplantations; time from transplantation 2.3±1.4 years) who performed prescribed and supervised exercises consisting of 3 sessions per week of aerobic and strengthening exercises for 1 year. Preliminary results show a significant decrease in body mass index (t=1.966; PSocial Functioning, and Role Emotional scale scores showed a significant improvement (P<.05). Preliminary results of the study protocol "Transplant…and Now Sport" show the positive effects of the model based on cooperation among transplantation centers, sports medicine centers, and gyms in the administration of a supervised exercise prescription. These data should be considered a contribution to developing and promoting further detailed exercise protocols and to fostering improved posttransplantation health and survival, helping to ensure that physical activity becomes a safe routine medical treatment plan of patient management.

  9. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  10. Project management plan for project W-320, tank 241-C-106 sluicing

    Energy Technology Data Exchange (ETDEWEB)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  11. Project structure plan requirements for the deconstruction projects; Anforderungen an den Projektstrukturplan in Rueckbauprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike [NIS Ingenieurgesellschaft mbH, Alzenau (Germany)

    2011-07-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  12. The Single And Multi Project Approach To Planning And Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2008-01-01

    with the challenging coordination of the work of several actors. The project planning and scheduling should, from the subcontractor’s perspective, allow for scope and flexibility so that the subcontractor can reallocate its resources at will between its ongoing projects and thereby optimise its own production. However......, reallocations of subcontracting resources lead to project interruptions which counteract on the overall productivity of the single construction project. Thus, there is a planning and scheduling conflict between the operational multi project management of the subcontracting firm and the management of single...... projects carried out by the management on site. This paper explains the single and multi project perspective on construction planning and scheduling represented by the main and the subcontractors and further, it describes how the prevailing scheduling method of today, i.e. the critical path method, conduce...

  13. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  14. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  15. The San Luis Valley Project : Closed Basin Division : Design and planning of the project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This design and planning document for the Closed Basin Division is a public information packet. The packet describes the planning process, design of the project,...

  16. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  17. Planning and initiation of detailed engineering design for the Great Plains coal gasification project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    During the course of detailed engineering it was expected that preliminary engineering documents would need to be modified. In a number of instances, however, especially for flow diagrams and specifications, the revised preliminary engineering documents became the final approved for construction (AFC) documents. P and ID's and plot plans were updated as a result of the detailed piping design. Equipment data sheets which initially contained basic process data were made mechanically complete and then further updated to reflect the equipment actually purchased. The initial issue of the preliminary engineering documents represent a necessary baseline for monitoring project design changes. Foundation work, equipment specifications and status of engineering in the various process operations are discussed.

  18. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  19. Rapid Automated Mission Planning System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  20. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  1. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  2. Comprehensive Evaluation of Large Infrastructure Project Plan with ANP

    Institute of Scientific and Technical Information of China (English)

    HAN Chuan-feng; CHEN Jian-ye

    2005-01-01

    Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.

  3. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  4. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  5. Preliminary Materials Transport Plan for the Plutonium Immobilization Plant

    Energy Technology Data Exchange (ETDEWEB)

    Gilkison, J.M.; Dyches, G.M.; Randall, W.J.; Steed, J.H.

    2000-01-26

    This Materials Transport Plan defines the methodology for moving process and non-process materials within the Plutonium Immobilization Plant (PIP) operations. The scope of the plan includes the movement of materials between plant operational units (gloveboxes or operational areas/rooms within the plant). The movements of materials within the various plant operational units are described in the System Design Description prepared for the individual units. The plan provides a design concept for transporting each type of material including the containerization used during the movements. Further, the plan identifies the high-level functions and requirements for movements of the materials.

  6. Technical program plan, Basalt Waste Isolation Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included. (DC)

  7. Initiation and planning of regional investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex

    2012-05-01

    Full Text Available In this paper, the authors show that the initiation of individual investment projects and their subsequent selection of local authorities often rely on officially articulated priorities of socio-economic development of the municipality and evaluations of their effectiveness. Furthermore it is shown that it is advisable to initiate projects from the bottom of the enterprise and incorporate them into a system of regional projects.

  8. South Bay Salt Pond Restoration Project : Phase 1 monitoring plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This SBSP Restoration Project Monitoring Plan provides methods to document the effect of restoration on important elements such as mercury uptake, and water and...

  9. Airport Ground Resource Planning Tool Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This effort undertakes the creation of an Airport Ground Resource Planning (AGRP) tool. Little or no automation is currently available to support airport ground...

  10. Low Energy Mission Planning Toolbox Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Low Energy Mission Planning Toolbox is designed to significantly reduce the resources and time spent on designing missions in multi-body gravitational...

  11. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  12. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  13. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  14. Project W-443 cask/transporation project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Byrd, L.C., Westinghouse Hanford

    1996-07-02

    This document has been prepared and is being released for Project W-443 participants to use in the performance of project activities. This PMP establishes the organizational responsibilities and baseline controls to be used to manage Spent Nuclear Fuel Subproject W-443.

  15. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  16. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  17. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  18. Is the planned and ongoing project (POP) database a suitable tool to reduce duplication in the process of assessing new health technologies in the European Union? Preliminary experience in the context of the EUnetHTA Joint Action Project Framework (2010-2012).

    Science.gov (United States)

    Vondeling, Hindrik; Sandvei, Marianne

    2014-11-01

    The European Network for Health Technology Assessment (EUnetHTA) Joint Action Project Framework, 2010-12, Work Package 7B (WP 7B), was aimed at facilitating collaboration between HTA agencies to avoid duplication of assessment efforts. A major task of WP 7B was to collect information on planned and ongoing (POP) projects by EUnetHTA agencies and to incorporate this information in a POP Database. We analyzed whether the Database served its intended purpose. A survey was sent to all fifty-seven EUnetHTA partners, complemented by telephone interviews with the Ludwig Boltzmann Institute of HTA in Austria (lead institution). Furthermore, detailed documentation on the activities of the POP Database was provided to the research team at CAST (University of Southern Denmark) by the lead institution. Forty-two of fifty-seven agencies (74 percent) responded to the survey. Eleven collaborations initiated by agencies themselves were reported. The scope of these collaborative activities was usually limited to information exchange on for example literature search protocols. A slight reduction of duplication of effort was documented. In addition, twelve collaborations at the full report level were initiated by the lead institution. While the POP Database has the potential to reduce duplication of effort, this has not been realized during the 3-year period of the EUnetHTA Joint Action Project Framework, 2010-12. Further evidence needs to be gathered to determine whether the POP Database is effective and whether the benefits outweigh the resources required to maintain it.

  19. EXPENSES FORECASTING MODEL IN UNIVERSITY PROJECTS PLANNING

    Directory of Open Access Journals (Sweden)

    Sergei A. Arustamov

    2016-11-01

    Full Text Available The paper deals with mathematical model presentation of cash flows in project funding. We describe different types of expenses linked to university project activities. Problems of project budgeting that contribute most uncertainty have been revealed. As an example of the model implementation we consider calculation of vacation allowance expenses for project participants. We define problems of forecast for funds reservation: calculation based on methodology established by the Ministry of Education and Science calculation according to the vacation schedule and prediction of the most probable amount. A stochastic model for vacation allowance expenses has been developed. We have proposed methods and solution of the problems that increase the accuracy of forecasting for funds reservation based on 2015 data.

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  2. QUEST2: Release 1: Project plan deliverable set

    Energy Technology Data Exchange (ETDEWEB)

    Braaten, F.D.

    1995-02-10

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.

  3. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  4. Reactor Safety Planning for Prometheus Project, for Naval Reactors Information

    Energy Technology Data Exchange (ETDEWEB)

    P. Delmolino

    2005-05-06

    The purpose of this letter is to submit to Naval Reactors the initial plan for the Prometheus project Reactor Safety work. The Prometheus project is currently developing plans for cold physics experiments and reactor prototype tests. These tests and facilities may require safety analysis and siting support. In addition to the ground facilities, the flight reactor units will require unique analyses to evaluate the risk to the public from normal operations and credible accident conditions. This letter outlines major safety documents that will be submitted with estimated deliverable dates. Included in this planning is the reactor servicing documentation and shipping analysis that will be submitted to Naval Reactors.

  5. Planning for sustainability in China's urban development: status and challenges for Dongtan eco-city project.

    Science.gov (United States)

    Cheng, Hefa; Hu, Yuanan

    2010-01-01

    With the rapid urbanization in China, the country faces significant challenges in sustainable urban development and actively explores novel ways to expand urban areas while conserving natural resources. Radical changes in city planning are being made to switch to sustainable development, with new cities being designed to be ecologically friendly guided by principles like carbon neutrality and self-sufficiency. This paper introduces the development of the Dongtan eco-city project on Chongming Island, Shanghai and describes how it addresses issues including energy, water, waste, transportation, ecosystem, and social and economic development in its design. The lessons and challenges of eco-city development based on the Dongtan experience are also discussed. If the vision of a zero-carbon emissions sustainable city is successfully realized, Dongtan will serve as a model for developing similar cities across China and the rest of the developing world. Currently, the development of this project is behind schedule and whether the eco-city plan will materialize or not is in question. Even though the project remains mostly on the drawing boards, the planning and preliminary development of Dongtan eco-city have generated significant enthusiasm for green buildings and influenced plans for other sustainable urban development projects in China.

  6. PLANNING OF MATERIAL RESOURCES AND LIQUIDITY ON PROJECT

    Directory of Open Access Journals (Sweden)

    BOŽILOVIĆ Zvonimir

    2016-11-01

    Full Text Available A complex project, as well as in the construction industry, requires the engagement of more categories of resources of type Work, uses many resources of type Material ad need sufficient financial resources regarding payment of costs. Purchases characterize materials during the project, consumptions, and inventories. By analogy can be observed the formation of the budget during the project: inflow of money, payment of costs and liquidity. The paper was exposed to the planning of Material resources and at the same time liquidity planning of the project with available Work resources. It is defined a general mathematical model to minimize the duration of the project and pointed out that there are four basic variants of the problem. This paper will propose the appropriate algorithms that generate solutions. Considering a hypothetical project, we will present the illustrative examples.

  7. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    Energy Technology Data Exchange (ETDEWEB)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  8. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans)...

  9. Integrated monitoring plan for the Hanford groundwater monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  10. Project Management Plan for the INEL technology logic diagrams

    Energy Technology Data Exchange (ETDEWEB)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  11. Project Management Plan for the INEL technology logic diagrams

    Energy Technology Data Exchange (ETDEWEB)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  12. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    Energy Technology Data Exchange (ETDEWEB)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  13. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  14. Project summary plan for HTGR recycle reference facility

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, B.J.

    1979-11-01

    A summary plan is introduced for completing conceptual definition of an HTGR Recycle Reference Facility (HRRF). The plan describes a generic project management concept, often referred to as the requirements approach to systems engineering. The plan begins with reference flow sheets and provides for the progressive evolution of HRRF requirements and definition through feasibility, preconceptual, and conceptual phases. The plan lays end-to-end all the important activities and elements to be treated during each phase of design. Identified activities and elements are further supported by technical guideline documents, which describe methodology, needed terminology, and where relevant a worked example.

  15. Preliminary Report on Seaside Sparrow Population Genetics Project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a preliminary report on a genetic variation study that was conducted at St. Vincent National Wildlife Refuge. Blood samples were taken from 57 Seaside...

  16. Investment Planning of Interdependent Waterway Improvement Projects

    Science.gov (United States)

    1993-03-01

    effects that cut across many, if not all subsets of the project set. Several authors including [Schoeman 68, Aaker 78, Baker 75, Gear 80, Fox 84...solution or at least a good suboptimal solution. 118 RZFIRUNCEB Aaker , D. A. and Tyebjee, T. T., "A Model for the Selection of Interdependent R and D

  17. Planning and Scheduling of Software Manufacturing Projects

    Science.gov (United States)

    1991-03-01

    component of the TG allows a tourist to query about the: 1. Local Tourist Attractions 2. Local Hotels The navigational (path finding) component of TG allows...Engineering Project Mangement System. Ph.D. Th., University of California at Santa Barbara, 1979. 138. Christopher Tong. "Toward an Engineering Science of

  18. Spent Nuclear Fuel (SNF) Project Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    LEROY, P.G.

    2000-11-03

    The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities.

  19. Tailoring Small IT Projects in the Project Planning Phase

    Science.gov (United States)

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  20. Preliminary Characterization Results from the DebriSat Project

    Science.gov (United States)

    Rivero, M.; Shiotani, B.; Kleespies, J.; Toledo-Burdett, R.; Moraguez, M.; Carrasquila, M.; Fitz-Coy, N.; Liou, J.-C.; Sorge, M.; Huynh, T.

    2016-01-01

    The DebriSat project is a continuing effort sponsored by NASA and DoD to update existing break-up models using data obtained from two separate hypervelocity impact tests used to simulate on-orbit collisions. To protect the fragments resulting from the impact tests, "soft-catch" arenas made of polyurethane foam panels were utilized. After each impact test, the test chamber was cleaned and debris resulting from the catastrophic demise of the test article were collected and shipped to the University of Florida for post-impact processing. The post-impact processing activities include collecting, characterizing, and cataloging of the fragments. Since the impact tests, a team of students has been working to characterize the fragments in terms of their mass, size, shape, color and material content. The focus of the 20 months since the impact tests has been on the collection of 2 millimeters- and larger fragments resulting from impact test on the 56 kilogram-representative LEO (Low Earth Orbit) satellite referred to as DebriSat. To date we have recovered in excess of 115,000 fragments, 30,000 more than the prediction of 85,000 fragments from the existing model. We continue to collect fragments but have transitioned to the characterization phase of the post-impact activities. Since the start of the characterization phase, the focus has been to utilize automation to (i) expedite fragment characterization process and (ii) minimize human-in-the- loop. We have developed and implemented such automated processes; e.g., we have automated the data entry process to reduce operator errors during transcription of the measurement data. However, at all steps of the process, there is human oversight to ensure the integrity of the data. Additionally, we have developed and implemented repeatability and reproducibility tests to ensure that the instrumentation used in the characterization process is accurate and properly calibrated. In this paper, the implemented processes are described and

  1. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  2. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  3. Advanced Hybrid Particulate Collector Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  4. 43 CFR 11.38 - Assessment Plan-preliminary estimate of damages.

    Science.gov (United States)

    2010-10-01

    ... damages. 11.38 Section 11.38 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.38 Assessment Plan—preliminary estimate of damages... resources, if the authorized official intends to include compensable value in the damage claim....

  5. Preliminary Closure Plan for the Immobilized Low Activity Waste (ILAW) Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    BURBANK, D.A.

    2000-08-31

    This document describes the preliminary plans for closure of the Immobilized Low-Activity Waste (ILAW) disposal facility to be built by the Office of River Protection at the Hanford site in southeastern Washington. The facility will provide near-surface disposal of up to 204,000 cubic meters of ILAW in engineered trenches with modified RCRA Subtitle C closure barriers.

  6. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  7. Report on the planning workshop on cost-effective ceramic machining. Ceramic Technology Project

    Energy Technology Data Exchange (ETDEWEB)

    Blau, P.J.

    1991-11-01

    A workshop on ``Cost Effective Ceramic Machining`` (CECM) was held at Oak Ridge Associated Universities Pollard Auditorium, Oak Ridge, Tennessee, May 1991. The purpose of this workshop was to present a preliminary project plan for industry critique and to identify specific components and cost-reduction targets for a new project on Cost Effective Ceramic Machining. The CECM project is an extension of the work on the Ceramic Technology for Advanced Heat Engines (CTAHE) Program sponsored by the Department of Energy, Office of Transportation Materials. The workshop consisted of fifteen invited papers, discussions, a survey of the attendee`s opinions, and a tour of the High Temperature Materials Laboratory at ORNL. The total number of registrants was sixty-seven, including thirty-three from industry or private sector organizations, seven from universities, three from industry groups, fourteen from DOE laboratories (including ORNL, Y-12, and Lawrence Livermore Laboratory), three from trade associations, and three from other government organizations. Forty- one survey forms, which critiqued the proposed project plan, were completed by attendees, and the results are presented in this report. Valves, cam roller followers, water pump seals, and diesel engine head plates were rated highest fro application of ceramic machining concepts to reduce cost. Coarse grinding, abrasives and wheel technology, and fine grinding were most highly rated as regards their impact on cost reduction. Specific cost-reduction targets for given parts varied greatly in the survey results and were not felt to be useful for the purposes for the CECM plan development. A range of individual comments were obtained and are listed in an appendix. As a result of the workshop and subsequent discussions, a modified project plan, different in certain aspects from the original CECM plan, has been developed.

  8. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  9. Near-facility environmental monitoring quality assurance project plan

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  10. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application... Dam Hydropower Project to be located on the East Fork of the Little Bear River near the town of...

  11. 77 FR 4290 - Conway Ranch Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Conway Ranch Hydropower Project; Notice of Preliminary Permit Application... the Federal Power Act (FPA), proposing to study the feasibility of the Conway Ranch Hydropower Project...

  12. The ENN project. ENN exploitation plan.

    Science.gov (United States)

    Dekena, R; Rehm-Berbenni, C; Seyfried, K

    2000-01-01

    The objective of the ENN-European Neurologic Network project is to improve knowledge and treatment of sleep disorders, headache and epilepsy. The means to obtain this objective shall be certain software to be distributed to the appropriate users in the medical field and the collection of relevant cases, in order to set up a neurological database. It is intended that the distribution of the above mentioned software and access to the database, will be able to finance research projects in the neurological field. The outcome of the EU funded project have been six prototypes, which need further work in order to establish a system of compatible and linked products. A particular emphasis of this work should be put on making the products as process oriented as possible. At the time being there are already products available in the market, which would be competing with particular ENN prototypes, but there is no set of compatible and linked products, which would be comparable with the intended set of ENN neurological tools. Such set of tools therefore could be a unique selling proposition. Intellectual property rights and legal implications have to be taken into consideration for the marketing of the ENN products. It has to be made sure, that no third party can assert violation of its IPRs and that, a protection of the products can be attained by appropriate application for IPRs. In the legal field in particular the prescriptions of data protection legislation have to be observed e.g. by obtaining the written consent of patients, whose cases are reported. The marketing concept should be set up as a short-term, middle-term, long-term strategy. The short-term strategy should concentrate on carrying out a market validation study at European level and simultaneously the development from prototype to products. The middle-term strategy should be directed towards the market introduction of the ENN products in Europe. The long-term strategy should comprise marketing of the products

  13. Streets Projecting in the Implementation Planning. Sustainability Perspectives in Landscape

    Directory of Open Access Journals (Sweden)

    Luigi Guastamacchia

    2014-12-01

    Full Text Available In the last years Puglia Region supported the theme of sustainability with programs and planning instruments and this led to think about the contemporary project at urban scale and about the order elements of all transformations: organizing solutions, building and aggregation types, halfpublic and public areas, streets. This work shows how the regional service of territorial structure tried to find a projecting system in terms of environement/ landscape sustainability to be proposed to the people engaged in the definition of all executive plans. This would ensure control and quality of the relationship between road pattern, open spaces and buildings.

  14. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  15. Project Planning, Implementation and Monitoring Issues, Findings and Recommendations

    Directory of Open Access Journals (Sweden)

    Muhammad Salim Javed

    2012-08-01

    Full Text Available The Higher Education Commission (HEC, Pakistan is one of the prestigious institutions of Government of Pakistan. It sets educational policies for all public and private sector universities of Pakistan. The objective of this study is to find institutional problems and issues of a project planning, implementation and monitoring issues. For this purpose, projects data were collected from Project Directors, HEC personnel's and consultants. Data were collected from 150 public and private sector universities and higher learning institution in the regions of Pakistan (i.e., Khyber Pakhtoon Khwa, Punjab, Sindh, Balochistan and Azad Jamu Kashmir using questionnaires. To provide the data, respondents were given the choice of being interviewed or self-administer the questionnaire and send them back to the researcher. After studying and analyzing the data, main problem and issues in project planning, implementation and monitoring issues were identified. In the view of these responses, rPecommendation had been concluded.

  16. Energy Strategic Planning & Self-Sufficiency Project

    Energy Technology Data Exchange (ETDEWEB)

    Greg Retzlaff

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follow: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  17. Preliminary identification of problem soils for infrastructure projects

    CSIR Research Space (South Africa)

    Paige-Green, P

    2008-11-01

    Full Text Available soils are those within the top 1.0m or 1.5m of the soil profile, a mechanism for evaluating these materials without preliminary filed work and testing would be invaluable. Since 1971, the Department of Agriculture has systematically mapped the soils...

  18. Sampling and Analysis Plan - Waste Treatment Plant Seismic Boreholes Project

    Energy Technology Data Exchange (ETDEWEB)

    Reidel, Steve P.

    2006-05-26

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the basalt, up to three new deep rotary boreholes through the basalt and sedimentary interbeds, and one corehole through the basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities.

  19. Preliminary assessment of potential CDM early start projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

    2000-11-01

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest

  20. Achieving Sustainable Value Planning For Malaysian Public Projects

    Directory of Open Access Journals (Sweden)

    Muhammad Faudzi

    2016-01-01

    Full Text Available Sustainability is the central development issue in the modern economy. Through sustainable development, quality of life can be improved or maintained over time. Since Malaysia is targeting to become a high-income nation by the year 2020, financial investment in public projects should be planned comprehensively so that it will generate immediate and long-term benefits to the country and the people. Within the currently tight financial environment, achieving value for money in public spending is seen as one of the enablers to maintain the right momentum of economic growth. Previous studies have established the importance of integrating sustainability consideration into Value Planning protocol in order to achieve value for money, underpinned by the sustainable development agenda. Despite the establishment of the framework for the integration, the opportunity of such integration within the Malaysian Value Planning protocol for public projects remains unclear. The present state of sustainability consideration within the Value Planning practice should be first evaluated, so that potential interventions to enhance the integration can be introduced. Responding to the gap, this exploratory study was conducted. The data was collected by means of document analysis, interviews and observations; subsequently analysed using the Template Analysis technique. Based on the current practice of Value Planning in Malaysia, ten interventions are proposed to transform the present practice into Sustainable Value Planning. Sustainable Value Planning is seen as a comprehensive concept in achieving value for money in public spending underpinned by the overarching concept of sustainability

  1. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  2. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    Energy Technology Data Exchange (ETDEWEB)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  3. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    Energy Technology Data Exchange (ETDEWEB)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  4. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    Energy Technology Data Exchange (ETDEWEB)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  5. The PLX- α Project: Progress and Plans

    Science.gov (United States)

    Hsu, S.; Witherspoon, F. D.; Cassibry, J.; Gilmore, M.; Samulyak, R.; Stoltz, P.; PLX-α Team

    2016-10-01

    The Plasma Liner Experiment-ALPHA (PLX- α) project aims to demonstrate the viability of spherically imploding plasma liners as a standoff driver for plasma-jet-driven magneto-inertial fusion (PJMIF). In the past year, progress has been made in designing and testing new contoured-gap coaxial guns, 3D model development and simulations (via Eulerian and Lagrangian hydrocodes) of PLX- α-relevant plasma-liner formation/implosion via up to 60 plasma jets ( 100 kJ of liner kinetic energy), 1D semi-analytic and numerical modeling of reactor-scale PJMIF (10s of MJ of liner kinetic energy), and preparation/upgrade of the PLX facility/diagnostics. The design goal for the coaxial guns is to form plasma jets of up to initial n 2 ×1016 cm-3, mass 5 mg, Vjet 50 km/s, rjet = 4 cm, and length 10 cm. The modeling research is assessing ram-pressure amplification and Mach-number degradation during liner convergence, evolution of liner non-uniformity amplitude and mode number, and exploration of PJMIF configurations with promising 1D and 2D fusion gains. Conical multi-jet-merging and full-4 π experiments will commence in Fall, 2016 and late 2017, respectively. Supported by the ARPA-E ALPHA Program.

  6. Preliminary planning study for safety relief valve experiments in a Mark III BWR pressure suppression system

    Energy Technology Data Exchange (ETDEWEB)

    McCauley, E.W.; Holman, G.S.

    1980-04-21

    In response to a request from the Water Reactor Safety Research Division of the US NRC, a preliminary study is provided which identifies key features and consideration involved in planning a comprehensive in-plant Safety Relief Valve experimental program for a Mark III containment design. The report provides identification of program objectives, measurement system requirements, and some details quantifying expected system response. In addition, a preliminary test matrix is outlined which involves a supporting philosophy intended to enhance the usefulness of the experimental results for all members of the program team: experimentalists, analysts, and plant operator.

  7. 77 FR 20382 - FFP Project 108, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-04-04

    ... Energy Regulatory Commission FFP Project 108, LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 108, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the... mode as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, FFP Project 108, LLC,...

  8. 浅析军工重大项目的策划与研究%Planning and Research of Military Major Projects

    Institute of Scientific and Technical Information of China (English)

    郑京森

    2015-01-01

    Excellent project planning is the important bridge connecting the project and project management. For a long time, project planning has been a short slab of military project. Influenced by the traditional planning system, military industrial project planning has been mired in plans and risk assessments. Referring to civil project planning ideas and methods, and combined with the characteristics of military projects, the defense industry project planning is studied and discussed in this papaer. At the same time, this plan has received preliminary application in some important projects.%优秀的项目策划是连接项目与项目管理的重要桥梁,长期以来,项目策划都是军工项目的一大短板。受到传统的计划体制的影响,军工项目策划一直陷于计划加风险评估的窠臼。本文借鉴民用项目的策划理念和方法,结合军工项目的特点,对军工项目策划进行了初步研究和探讨。同时,此方案已经在某重大项目中得到初步应用。

  9. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans...

  10. Marine radioecology. Annual report 1996. Project plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The project plan for the EKO-1 project states that `the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment`. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project (`Limnic systems`). (EG) 52 refs.

  11. Fission-Product Development Laboratory cell-decommissioning project plan

    Energy Technology Data Exchange (ETDEWEB)

    Myrick, T.E.; Schaich, R.W.; Williams, F.V.

    1983-08-01

    The Fission Product Development Laboratory (FPDL) at Oak Ridge National Laboratory (ORNL) was a full-scale processing facility for separating megacurie quantities of /sup 90/Sr, /sup 137/Cs, and /sup 144/Ce for a variety of source applications, operating at full capacity from 1958 to 1975. Since facility shutdown, the inactive portions of the FPDL have been maintained in a protective storage mode as part of the ORNL Surplus Facilities Management Program (SFMP). Due to the significant radio-nuclide inventory remaining in the facility, the high surveillance and maintenance costs necessary to assure radionuclide containment, and the potential for reuse of the facility by other programs, the decommissioning of the inactive portions of the FPDL has been given a high priority by the SFMP. In response to this program direction, plans are being made for initiation of these activities in late FY 1983. This project plan has been prepared to satisfy the program documentation requirements for SFMP project planning. The plan outlines the scope of the proposed effort, describes the proposed methods of project accomplishment, and provides estimates of the project resource needs and schedule.

  12. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  13. NIF Project Quality Assurance Program Plan Revision E

    Energy Technology Data Exchange (ETDEWEB)

    Dun, C; Brereton, S; Yatabe, J; Moses, E I

    2001-06-01

    The National Ignition Facility (NIF) is a key constituent of the Department Energy's (DOE's) Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets and will perform weapons physics, weapons effects, and high-energy-density experiments in support of national security and civilian objectives. The primary mission of the NIF Project is the design and construction of the facility and equipment, acceptance testing, and activation. To accomplish this mission, the LLNL Director created the NIF Programs Directorate, and within that Directorate, the NIF Project Office to organize and manage the Project. The NIF Project Office establishes this QA Program to ensure its success. This QA Program Plan (QAPP) defines and describes the program--the management system--for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of LLNL and the NIF Programs Directorate.

  14. PLANNING THE WORK OF AVIATION UNITS USING PROJECT MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Dmitry Valerievich Bogomolov

    2017-01-01

    Full Text Available The article deals with the problematic issues of planning the work of aviation units and offers one of the possible variants of their solutions by means of project management tools implementation in aviation units.As a key concept in the theory of planning, the author proposes introducing the concept of a project as a complex, non-repeating one-time action, limited in time, budget, resources and in clear guidance throughout the process, followingthe customer requirements. In aviation engineering service work, this also includes such works as operational preparationstypes, routine maintenance, aviation technology improvements, military repair etc.The use of network models can also easily specify the sequence of some of the actions (events, to make process flow charts and organizational charts.The main advantage of linear graphs is their clarity and simplicity. Linear graphs make it possible to optimize the work on a variety of criteria, including the equability of labor force, machinery, building materials, etc. At the same time,the main drawback of linear graphs is that they are difficult to correct in case of non-compliance with the deadlines or a change in their arrangement. These drawbacks are eliminated by a different form of scheduling - network charts.The scheme of planning the work of units using project management tools is given. To carry out the scheme theauthor proposes to use modern tools of project management, which allow to structure the process of maintenance activities through its decomposition into phases, tasks and subtasks, then to identify critical path tasks, construct the chart of imple- mentation. The process model as a project allows to make the prognostic analysis and to improve the process according to it, for what a number of modern software packages that automate the functions of planning and planned types of work schedule control.

  15. The plan as a project comprehending its process

    Directory of Open Access Journals (Sweden)

    Giuseppe Ridolfi

    2011-11-01

    Full Text Available The article outlines a methodology for the building planning, which is the result of studies and applied research carried out by the author over recent decades for the reorganisation of school networks, intermunicipal multipolar universities, university campuses and parallel experiences for the reshaping of hospital centres and structural healthcare systems on a large scale. The method reproposes the open project and metaproject making its operability topical in light of the recent paradigms of rational methods of practice and the opportunities offered by IT and value management. The aim is to present the project-related nature of the plan as a project comprehending its process, focusing on designing a dynamic and interactive pathway, one that might even be disconnected, capable of highlighting, interacting and composing the majority of material and immaterial resources for the construction of sense and consensus.

  16. Shot planning and analysis tools on the NIF project

    Energy Technology Data Exchange (ETDEWEB)

    Beeler, R. [Lawrence Livermore National Laboratory, Livermore, CA (United States); Casey, A., E-mail: casey20@llnl.gov [Lawrence Livermore National Laboratory, Livermore, CA (United States); Conder, A.; Fallejo, R.; Flegel, M.; Hutton, M.; Jancaitis, K.; Lakamsani, V.; Potter, D.; Reisdorf, S.; Tappero, J.; Whitman, P.; Carr, W.; Liao, Z. [Lawrence Livermore National Laboratory, Livermore, CA (United States)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Target shots in NIF, dozens a month, vary widely in laser and target configuration. Black-Right-Pointing-Pointer A planning tool helps select shot sequences that optimize valuable facility time. Black-Right-Pointing-Pointer Fabrication and supply of targets, diagnostics, etc. are integrated into the plan. Black-Right-Pointing-Pointer Predictive modeling of aging parts (e.g., optics) aids maintenance decision support. Black-Right-Pointing-Pointer We describe the planning/analysis tool and its use in NIF experimental operations. - Abstract: Shot planning and analysis tools (SPLAT) integrate components necessary to help achieve a high over-all operational efficiency of the National Ignition Facility (NIF) by combining near and long-term shot planning, final optics demand and supply loops, target diagnostics planning, and target fabrication requirements. Currently, the SPLAT project is comprised of two primary tool suites for shot planning and optics demand. The shot planning component provides a web-based interface to selecting and building a sequence of proposed shots for the NIF. These shot sequences, or 'lanes' as they are referred to by shot planners, provide for planning both near-term shots in the Facility and long-term 'campaigns' in the months and years to come. The shot planning capabilities integrate with the Campaign Management Tool (CMT) for experiment details and the NIF calendar for availability. Future enhancements will additionally integrate with target diagnostics planning and target fabrication requirements tools. The optics demand component is built upon predictive modeling of maintenance requirements on the final optics as a result of the proposed shots assembled during shot planning. The predictive models integrate energetics from a Laser Performance Operations Model (LPOM), the status of the deployed optics as provided by the online Final Optics Inspection system, and physics

  17. Preliminary Marketing Plan for Baby Carriage Online Store in Murmansk Region

    OpenAIRE

    Kirienko, Valeriia

    2016-01-01

    The goal of the thesis is to create a clear and understandable preliminary marketing plan based on both types of research: secondary and primary. The objective is to identify strategic marketing ideas based on different analyses and research. The chosen bibliography together with the thesis author’s own thoughts and experience are used in the thesis work. For secondary research, the author of the thesis uses information from Data Insight company. The firm provides the results of the survey...

  18. Preliminary Marketing Plan for Baby Carriage Online Store in Murmansk Region

    OpenAIRE

    Kirienko, Valeriia

    2016-01-01

    The goal of the thesis is to create a clear and understandable preliminary marketing plan based on both types of research: secondary and primary. The objective is to identify strategic marketing ideas based on different analyses and research. The chosen bibliography together with the thesis author’s own thoughts and experience are used in the thesis work. For secondary research, the author of the thesis uses information from Data Insight company. The firm provides the results of the survey...

  19. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  20. Quinault Indian Nation Comprehensive Biomass Strategic Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas, Jesus [American Community Enrichment, Elma, WA (United States)

    2015-03-31

    The overall purposes of the Quinault Indian Nation’s Comprehensive Biomass Strategic Planning Project were to: (1) Identify and confirm community and tribal energy needs; (2) Conducting an inventory of sustainable biomass feedstock availability; (3) Development of a biomass energy vision statement with goals and objectives; (4) Identification and assessment of biomass options for both demand-side and supply side that are viable to the Quinault Indian Nation (QIN); and (5) Developing a long-term biomass strategy consistent with the long-term overall energy goals of the QIN. This Comprehensive Biomass Strategic Planning Project is consistent with the QIN’s prior two-year DOE Renewable Energy Study from 2004 through 2006. That study revealed that the most viable options to the QIN’s renewable energy options were biomass and energy efficiency best practices. QIN's Biomass Strategic Planning Project is focused on using forest slash in chipped form as feedstock for fuel pellet manufacturing in support of a tribal biomass heating facility. This biomass heating facility has been engineered and designed to heat existing tribal facilities as well as tribal facilities currently being planned including a new K-12 School.

  1. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Lindsay V. Reynolds,; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  2. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  3. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  4. Megaprojects and regional development: Pathologies in project planning

    Energy Technology Data Exchange (ETDEWEB)

    Gunton, T. [Simon Fraser University, Burnaby, BC (Canada). School for Resource & Environmental Management

    2003-07-01

    This paper helps completes an evaluation that compares pre-project forecasts to post-project outcomes for one of the largest and most comprehensively planned megaprojects ever undertaken in Canada: the Northeast Coal Project (NECP). The evaluation shows that instead of achieving the expected net benefit of Can$0-9 billion (2000 Canadian $), the NECP incurred a net loss of Can$2.8 billion. The project also generated less than one-half of expected regional employment and failed to mitigate structural problems in the regional economy. Although project planners had all the information that should have led them to forecast this negative outcome, this information was either ignored or dismissed. The explanation for this seemingly irrational behaviour on the part of project planners is explained by a combination of errors in the evaluation methodology and interest group behaviour in regional resource development. Strategies to reduce the likelihood of these errors in future projects include improvements in evaluation methodology and changes in the institutional structure of project evaluation.

  5. Energy planning with decision-making tools : Experiences from an energy-planning project

    OpenAIRE

    Stenlund Nilsson Ivner, Jenny

    2009-01-01

    This article presents the evaluation of a pilot project where four decision-making tools are applied in a municipal energy planning process in a Swedish municipality. The tested tools are a citizens’ panel, a combination of external scenarios and backcasting, and life cycle assessment and qualitative checklists for environmental assessment. The presented results are based on two focus group discussions with the participants from the project: one with the municipal workgroup and one with the r...

  6. Distributed Processing of Projections of Large Datasets: A Preliminary Study

    Science.gov (United States)

    Maddox, Brian G.

    2004-01-01

    Modern information needs have resulted in very large amounts of data being used in geographic information systems. Problems arise when trying to project these data in a reasonable amount of time and accuracy, however. Current single-threaded methods can suffer from two problems: fast projection with poor accuracy, or accurate projection with long processing time. A possible solution may be to combine accurate interpolation methods and distributed processing algorithms to quickly and accurately convert digital geospatial data between coordinate systems. Modern technology has made it possible to construct systems, such as Beowulf clusters, for a low cost and provide access to supercomputer-class technology. Combining these techniques may result in the ability to use large amounts of geographic data in time-critical situations.

  7. International differences in project planning and organizational project planning support in Sweden, Japan, Israel, and Malaysia

    OpenAIRE

    Amy, Chin Mei Yen; Pulatov, Bakhtier

    2008-01-01

    The study of the cultures has been a primary focus of sociology, psychology and anthropology since their inception. Increasing globalization has brought the attention of academics and practitioners to the study of national cultures and their differences into the management area. Likewise, the parallel trend towards running some business through projects has brought broader perspectives such as national cultures into the project management field. Recent academic literature demonstrated that na...

  8. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  9. Efficient dam break flood simulation methods for developing a preliminary evacuation plan after the Wenchuan Earthquake

    Directory of Open Access Journals (Sweden)

    Y. Li

    2012-01-01

    Full Text Available The Xiaojiaqiao barrier lake, which was the second largest barrier lake formed by the Wenchuan Earthquake had seriously threatened the lives and property of the population downstream. The lake was finally dredged successfully on 7 June 2008. Because of the limited time available to conduct an inundation potential analysis and make an evacuation plan, barrier lake information extraction and real-time dam break flood simulation should be carried out quickly, integrating remote sensing and geographic information system (GIS techniques with hydrologic/hydraulic analysis. In this paper, a technical framework and several key techniques for this real-time preliminary evacuation planning are introduced. An object-oriented method was used to extract hydrological information on the barrier lake from unmanned aerial vehicle (UAV remote sensing images. The real-time flood routine was calculated by using shallow-water equations, which were solved by means of a finite volume scheme on multiblock structured grids. The results of the hydraulic computations are visualized and analyzed in a 3-D geographic information system for inundation potential analysis, and an emergency response plan is made. The results show that if either a full-break or a half-break situation had occurred for the Chapinghe barrier lake on 19 May 2008, then the Xiaoba Town region and the Sangzao Town region would have been affected, but the downstream towns would have been less influenced. Preliminary evacuation plans under different dam break situations can be effectively made using these methods.

  10. Efficient dam break flood simulation methods for developing a preliminary evacuation plan after the Wenchuan Earthquake

    Science.gov (United States)

    Li, Y.; Gong, J. H.; Zhu, J.; Ye, L.; Song, Y. Q.; Yue, Y. J.

    2012-01-01

    The Xiaojiaqiao barrier lake, which was the second largest barrier lake formed by the Wenchuan Earthquake had seriously threatened the lives and property of the population downstream. The lake was finally dredged successfully on 7 June 2008. Because of the limited time available to conduct an inundation potential analysis and make an evacuation plan, barrier lake information extraction and real-time dam break flood simulation should be carried out quickly, integrating remote sensing and geographic information system (GIS) techniques with hydrologic/hydraulic analysis. In this paper, a technical framework and several key techniques for this real-time preliminary evacuation planning are introduced. An object-oriented method was used to extract hydrological information on the barrier lake from unmanned aerial vehicle (UAV) remote sensing images. The real-time flood routine was calculated by using shallow-water equations, which were solved by means of a finite volume scheme on multiblock structured grids. The results of the hydraulic computations are visualized and analyzed in a 3-D geographic information system for inundation potential analysis, and an emergency response plan is made. The results show that if either a full-break or a half-break situation had occurred for the Chapinghe barrier lake on 19 May 2008, then the Xiaoba Town region and the Sangzao Town region would have been affected, but the downstream towns would have been less influenced. Preliminary evacuation plans under different dam break situations can be effectively made using these methods.

  11. 77 FR 60420 - FFP Project 66 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 66 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 66, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  12. 77 FR 60421 - FFP Project 67 LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 67 LLC; Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 67, LLC filed an application for a preliminary permit, pursuant to section 4(f)...

  13. 77 FR 60423 - FFP Project 71 LLC; Notice of Preliminary Permit Application Accepted For Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 71 LLC; Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 71, LLC filed an application for a preliminary permit, pursuant to section 4(f)...

  14. 77 FR 60421 - FFP Project 68 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 68 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 68, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  15. 77 FR 60423 - FFP Project 72 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 72 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 72, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  16. 77 FR 60422 - FFP Project 63 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 63 LLC; Notice of Preliminary Permit Application Accepted..., 2012, FFP Project 63, LLC filed an application for a preliminary permit, pursuant to section 4(f)...

  17. 77 FR 60422 - FFP Project 69 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-10-03

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 69 LLC; Notice of Preliminary Permit Application Accepted for..., FFP Project 69, LLC filed an application for a preliminary permit, pursuant to section 4(f) of...

  18. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.

  19. Planned and ongoing projects (pop) database: development and results.

    Science.gov (United States)

    Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice

    2014-11-01

    The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.

  20. Optimisation of small-scale hydropower using quality assurance methods - Preliminary project; Vorprojekt: Optimierung von Kleinwasserkraftwerken durch Qualitaetssicherung. Programm Kleinwasserkraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Hofer, S.; Staubli, T.

    2006-11-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of a preliminary project that examined how quality assurance methods can be used in the optimisation of small-scale hydropower projects. The aim of the project, to use existing know-how, experience and synergies, is examined. Discrepancies in quality and their effects on production prices were determined in interviews. The paper describes best-practice guidelines for the quality assurance of small-scale hydro schemes. A flow chart describes the various steps that have to be taken in the project and realisation work. Information collected from planners and from interviews made with them are presented along with further information obtained from literature. The results of interviews concerning planning work, putting to tender and the construction stages of these hydro schemes are presented and commented on. Similarly, the operational phase of such power plant is also examined, including questions on operation and guarantees. The aims of the follow-up main project - the definition of a tool and guidelines for ensuring quality - are briefly reviewed.

  1. 242-A evaporator quality assurance project plan: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, B.J.

    1994-11-04

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal.

  2. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  3. HOW TO COMPILE A PROJECT MANAGEMENT PLAN FOR AN OVERSEAS CONTRACTING CONSTRUCTION PROJECT

    Institute of Scientific and Technical Information of China (English)

    李彦

    2010-01-01

    @@ Generally before the commencement of an international project contract,the Client and the Consulting Engineer may require the Contractor to submit a relevant Project Management Plan(PMP)according to the provisions prescribed in the tender documents or contract documents within a specified period of time.The approved PMP by the Client and the Consulting Engineer shall be strictly abided by the Contractor during the whole process of contract implementation.

  4. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    Energy Technology Data Exchange (ETDEWEB)

    SINCLAIR, J.C.

    1999-05-03

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex.

  5. Study on Top-Down Estimation Method of Software Project Planning

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei

    2006-01-01

    This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.

  6. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  7. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-03-08

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of...

  8. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a

  9. 49 CFR 611.7 - Relation to planning and project development processes.

    Science.gov (United States)

    2010-10-01

    ... Relation to planning and project development processes. All new start projects proposed for funding assistance under 49 USC 5309 must emerge from the metropolitan and Statewide planning process, consistent... 49 Transportation 7 2010-10-01 2010-10-01 false Relation to planning and project development...

  10. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  11. Solar Central Receiver Prototype Heliostat. Volume II. Phase II planning (preliminary)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    A currently planned DOE program will develop and construct a 10 MW/sub e/ Pilot Plant to demonstrate the feasibility and operational characteristics of Solar Central Receiver Power Generation. The field of heliostats is a major element of the Solar Central Receiver Power Generation system. The primary objective of the program described is to establish and verify the manufacturability, performance, durability, and maintenance requirements of the commercial plant heliostat design. End products of the 16 month effort include: (1) design, fabrication, and test of heliostats; (2) preliminary designs of manufacturing, assembly, installation, and maintenance processes for quantity production; (3) detailed design of critical tooling or other special equipment for such processes; (4) refined cost estimates for heliostats and maintenance; and (5) an updated commercial plant heliostat preliminary design. The program management and control system is discussed. (WHK)

  12. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  13. Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan

    Energy Technology Data Exchange (ETDEWEB)

    Stringfellow, William T.

    2005-05-13

    A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

  14. Preliminary Water Assessment Reports of The Test Basins of The Watch Project

    NARCIS (Netherlands)

    Ludwig, F.; Candel, M.; Carrera, J.; Fendekova, M.; Haddeland, I.; Horacek, S.; Jodar, J.; Koutroulis, A.; Navorro, V.; Tsanis, I.

    2008-01-01

    This report presents the initial plans of the case studies how they link to rest of the Watch project and on which water resources they will focus. This report will function as the basis for further discussions on how to improve the integration of the case studies within the project and to develop a

  15. Nuclear criticality project plan for the Hanford Site tank farms

    Energy Technology Data Exchange (ETDEWEB)

    Bratzel, D.R., Westinghouse Hanford

    1996-08-06

    The mission of this project is to provide a defensible technical basis report in support of the Final Safety Analysis Report (FSAR). This technical basis report will also be used to resolve technical issues associated with the nuclear criticality safety issue. The strategy presented in this project plan includes an integrated programmatic and organizational approach. The scope of this project plan includes the provision of a criticality technical basis supporting document (CTBSD) to support the FSAR as well as for resolution of the nuclear criticality safety issue. Specifically, the CTBSD provides the requisite technical analysis to support the FSAR hazard and accident analysis as well as for the determination of the required FSAR limits and controls. The scope of The CTBSD will provide a baseline for understanding waste partitioning and distribution phenomena and mechanistics for current operational activities inclusive of single-shell tanks, double-shell tanks, double-contained receiver tanks, and miscellaneous underground storage tanks.. Although the FSAR does not include future operational activities, the waste partitioning and distribution phenomena and mechanistics work scope identified in this project plan provide a sound technical basis as a point of departure to support independent safety analyses for future activities. The CTBSD also provides the technical basis for resolution of the technical issues associated with the nuclear criticality safety issue. In addition to the CTBSD, additional documentation will be required to fully resolve U.S. Department of Energy-Headquarters administrative and programmatic issues. The strategy and activities defined in this project plan provide a CTBSD for the FSAR and for accelerated resolution of the safety issue in FY 1996. On April 30, 1992, a plant review committee reviewed the Final Safety Analysis Reports for the single-shell, double-shell, and aging waste tanks in light of the conclusions of the inadequate waste

  16. The HCV Synthesis Project: Scope, methodology, and preliminary results

    Directory of Open Access Journals (Sweden)

    Scheinmann Roberta

    2008-09-01

    Full Text Available Abstract Background The hepatitis C virus (HCV is hyper-endemic in injecting drug users. There is also excess HCV among non-injection drug users who smoke, snort, or sniff heroin, cocaine, crack, or methamphetamine. Methods To summarize the research literature on HCV in drug users and identify gaps in knowledge, we conducted a synthesis of the relevant research carried out between 1989 and 2006. Using rigorous search methods, we identified and extracted data from published and unpublished reports of HCV among drug users. We designed a quality assurance system to ensure accuracy and consistency in all phases of the project. We also created a set of items to assess study design quality in each of the reports we included. Results We identified 629 reports containing HCV prevalence rates, incidence rates and/or genotype distribution among injecting or non-injecting drug user populations published between January 1989 and December 2006. The majority of reports were from Western Europe (41%, North America (26%, Asia (11% and Australia/New Zealand (10%. We also identified reports from Eastern Europe, South America, the Middle East, and the Caribbean. The number of publications reporting HCV rates in drug users increased dramatically between 1989 and 2006 to 27–52 reports per year after 1998. Conclusion The data collection and quality assurance phases of the HCV Synthesis Project have been completed. Recommendations for future research on HCV in drug users have come out of our data collection phase. Future research reports can enhance their contributions to our understanding of HCV etiology by clearly defining their drug user participants with respect to type of drug and route of administration. Further, the use of standard reporting methods for risk factors would enable data to be combined across a larger set of studies; this is especially important for HCV seroconversion studies which suffer from small sample sizes and low power to examine risk

  17. Dynamic Damage Modeling for IRAC Simulations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Integrated Resilient Aircraft Control (IRAC) Project, Preliminary Technical Plan Summary identifies several causal and contributing factors that can lead to...

  18. The Haida Gwaii Diabetes Project: planned response activity outcomes.

    Science.gov (United States)

    Heffernan, Clare; Herbert, Carol; Grams, Garry D.; Grzybowski, Stefan; Wilson, Mary Ann; Calam, Betty; Brown, Diane

    1999-11-01

    A 1992 chart review in the Haida Village of Skidegate, Haida Gwaii/Queen Charlotte Islands, Canada, revealed that 17% of the unscreened population aged 35 or over have been diagnosed with diabetes. The Haida Gwaii Diabetes Project was designed to develop a culturally sensitive community-based participatory action approach to the management of noninsulin-dependent diabetes (NIDDM). Phase One included obtaining community support, conducting a chart review, holding clinics to measure biophysical indicators, conducting focus groups, and planning response activities with the communities. A list of activities was developed, based on the focus group results. In addition, the project team developed a set of operating principles that ensured and reinforced collaboration. Phase Two included implementing and monitoring planned response activities, and holding exit clinics. The best attended activities were trials of traditional herbal medicine and traditional diet, and an exercise programme. While participation levels were not high enough for causal conclusions, a significant decrease in total cholesterol (0.45; P = 0.005) and rise in HDL (-0.097; P = 0.05) was found for participants for whom paired values were available. Diabetes intervention research in First Nations settings involves small numbers of participants, making it difficult to quantitatively assess outcomes. To increase participation it is advisable to open activities to the whole community, to tie planned activities into other scheduled community events, and to share findings concerning managing illnesses of acculturation with other communities.

  19. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  20. New shipyard layout design for the preliminary phase & case study for the green field project

    Directory of Open Access Journals (Sweden)

    Young Joo Song

    2013-03-01

    Full Text Available For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

  1. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  2. Large hadron collider (LHC) project quality assurance plan

    Energy Technology Data Exchange (ETDEWEB)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  3. PUREX/UO{sub 3} deactivation project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  4. Preliminary findings from the Oranga Niho dental student outplacement project.

    Science.gov (United States)

    Anderson, V R; Rapana, S T; Broughton, J R; Seymour, G J; Rich, A M

    2015-03-01

    To examine stakeholder perspectives of the Bachelor of Dental Surgery 2012-2013 clinical outplacement programme with Māori Oral Health Providers (MOHPs) and inform the programme's ongoing development. A mixed methods kaupapa Māori action research project. Six North Island MOHPs and the University of Otago Faculty of Dentistry. Online questionnaires were used to conduct a pre- and post-outplacement survey of dental students and a twice-yearly survey of all MOHP-based clinical supervisors. Paper questionnaires were used to survey adult clients and caregivers of child clients that the students treated. Data were analysed descriptively and thematically. 68 (61%) of the 112 eligible students completed the pre- and post-outplacement questionnaires; 31 clinical supervisor questionnaire responses were received representing all six MOHPs; and 426 client and 130 caregiver questionnaire responses were received from five MOHPs. 79% of students felt well prepared for outplacement and 75% indicated that they would consider working for a MOHP in future. Of the clinical supervisors, 93% indicated that the students were adequately prepared for outplacement, and 68%, that they would recommend one or more students for employment. However, 58% associated the outplacements with decreased productivity. More than 97% of adult clients and caregivers of child clients were pleased with the care that the students provided. Recommendations for strengthening the outplacement programme included: increasing communication between the Faculty, MOHPs and students; addressing the financial cost of the programme to the MOHPs; and providing more support for clinical supervisors.

  5. Farm Fuel Alcohol Project: preliminary report on facility design

    Energy Technology Data Exchange (ETDEWEB)

    Pile, R S; Badger, P C; Roetheli, J C; Waddell, Jr, E L

    1979-09-01

    This report describes the design of a farm-based ethanol production system to be built by TVA at Muscle Shoals, Alabama. This facility will include cooking, fermentation, and distillation equipment to allow production of 8000 to 12,000 gallons of fuel ethanol during a three to four month period each year. Output will be about 10 gallons of 190-proof ethanol per hour. Present components are sized to allow 12 to 14 hour daily operation as a semi-continuous batch system. Intent of the project is to document equipment and energy requirements, ethanol yields, and feasibility of small farm-based ethanol plants for farm fuel self-sufficiency. Cooking and fermentation will be batch-type operations, and packed distillation columns will be used for separating ethanol from the fermented beer. Energy recovery and waste heat use are integrated when feasible. The fermented beer will be fed directly to the distillation columns without separation of solids. Although this is an area of concern, an economical method of separation could not be identified.

  6. Test plan for preliminary study of inorganic contaminant removal from RMA groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, D.; Terkonda, P.; Weeks, N.

    1978-02-01

    This document consists of a major report on inorganic contaminant removal from ground water. In this plan, WES has been requested by the OPM-CDIR to conduct a literature review and preliminary laboratory treatability studies on various source waters at RMA. Recommendation is that the determination of suitable treatment processes be based on both engineering and economic analysis and that the processes be compatible with the organic contaminant treatment processes under study (activated carbon adsorption and ultraviolet/ozone oxidation). The amendment to the test plan presents the inorganic treatment processes found from the literature to be applicable to the inorganic contaminants in RMA ground water and outlines the bench scale study to be conducted at WES using the potential processes. The rest of the document is correspondence and reports on various water treatability.

  7. Project Planning and Management for First Year Engineering Students

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; S. Stachowicz, Marian

    2014-01-01

    of this educational paradigm are:1) Theme of semester; 2) Continuous group work during the semester; 3) Students manage their own educational processes; 4) The teacher and group members as resources. Russian educational system has restrictions to use PBL. Some of them are: 1) “Vertical” structure of learning plans....... Related courses follow each other in different semesters. So there is no theme of semester; 2) The classroom set-up has limitations. There is no way to provide a permanent place for a project work for each group; 3) Classical forms of education are based on an active role of the teacher; 4. While...

  8. Implementation plan for the Operations Center Upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed.

  9. Note: The PLEEC ProjectPlanning for Energy Efficient Cities

    DEFF Research Database (Denmark)

    Kullman, Mikael; Campillo, Javier; Dahlquist, Erik;

    2016-01-01

    Globally, more than 50% of all people are living in cities today. Enhancing sustainability and efficiency of urban energy systems is thus of high priority for global sustainable development. The European research project PLEEC (Planning for Energy Efficient Cities) focuses on technological......, innovative, behavioural and structural capacities of European medium-sized cities in their transition towards Energy Smart Cities. The variation of strengths and weaknesses of cities’ capabilities as well as practices and tools for enhancing energy efficient performance of urban energy systems were...

  10. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented.

  11. Quality Assurance Project Plan for waste tank vapor characterization

    Energy Technology Data Exchange (ETDEWEB)

    Suydam, C.D. Jr.

    1993-12-01

    This Quality Assurance Project Plan, WHC-SD-WM-QAPP-013, applies to four separate vapor sampling tasks associated with Phases 1 and 2 of the Tank Vapor Issue Resolution Program and support of the Rotary Mode Core Drilling Portable Exhauster Permit. These tasks focus on employee safety concerns and tank ventilation emission control design requirements. Previous characterization efforts and studies are of insufficient accuracy to adequately define the problem. It is believed that the technology and maturity of sampling and analytical methods can be sufficiently developed to allow the characterization of the constituents of the tank vapor space.

  12. Researching on quantitative project management plan and implementation method

    Science.gov (United States)

    Wang, Xin; Ren, Aihua; Liu, Xiangshang

    2017-08-01

    With the practice of high maturity process improvement, more and more attention has been paid to CMMI and other process improvement frameworks. The key to improve the process of high maturity is to quantify the process. At present, the method of improving the software process of high maturity is lack of specific introduction to the corresponding improvement link or process implementation. In this paper, based on the current improvement in the quantitative management of the framework and statistical analysis technical of the high maturity recommended for the enterprise to improve the process of planning and implementation methods. These methods provide quantitative process management for the enterprise, as well as quantitative management of the project to provide a systematic process, and finally evaluate the effectiveness of quantitative management projects. Finally, this method is used to verify the effectiveness of the framework in guiding the enterprise to improve the process of high maturity.

  13. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  14. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...... of the project, the focus is on the regional extend of diurnal variability. Particularly, extensive sensitivity tests regarding the definition of SSTfound fields show that using only quality 5 SEVIRI data results in warmer foundation fields SSTfound while there is an added ∼0.2 K variability when using multi...... Ocean Turbulence Model (GOTM) is applied. Preliminary results show that the initial temperature profiles may give a warmer start-up in the model while the light extinction scheme is a controlling factor for the amplitude and vertical extend of the daily signal....

  15. SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELIMINARY DESIGN HAZARD ANALYSIS SUPPLEMENT 1

    Energy Technology Data Exchange (ETDEWEB)

    FRANZ GR; MEICHLE RH

    2011-07-18

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  16. Financial planning for district heating: The Brooklyn Navy Yard project: A project report

    Energy Technology Data Exchange (ETDEWEB)

    1984-05-01

    Financial planning for the Brooklyn Navy Cogeneration and District Heating Project involved the establishment of three distinct potential markets, a determination of economic feasibility and the development of a financial structure that could accommodate the diverse social objectives of the project and the nature of the markets to be served. The Brooklyn Navy Yard (BNY) is owned by the City of New York (City) and managed by the non-profit Brooklyn Navy Yard Development Corporation for operation as an industrial park. Development of a cogeneration/district heating facility at the Navy Yard was undertaken to meet multiple community and economic development objectives.

  17. Integrated development and testing plan for the plutonium immobilization project

    Energy Technology Data Exchange (ETDEWEB)

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology

  18. Estimating landslide losses - preliminary results of a seven-State pilot project

    Science.gov (United States)

    Highland, Lynn M.

    2006-01-01

    Introduction: In 2001, the U.S. Geological Survey Landslide Hazards Program provided funding for seven State geological surveys to report on the status of landslide investigation strategies in each of their States, and to suggest improved ways to approach the tracking of landslides, their effects, losses associated with the landslides, and hazard mitigation strategies. Each State was to provide a draft report suggesting innovative ways to track landslides, and to participate in subsequent workshops. A workshop was convened in June 2003 in Lincoln, Neb., to discuss the results and future strategies on how best to incorporate the seven pilot projects into one methodology that all of the 50 States could adopt. The seven individual reports produced by the State surveys are published here to put forth a forum for discussion of the varying methods of tracking landslides. The goal is to eventually adopt a single, universally applied methodology to track landslides that will provide a consistent framework for collecting data on landslide damage and economic impact. Participating States include: California (James Davis, Jack McMillan); Kentucky (Jim Cobb, John Kiefer, John Rockaway); Nebraska (Mark Kuzila, Duane Eversoll); Ohio (Thomas Berg, Jon Rockaway), Oregon (John Beaulieu, Yumei Wang, Renee Summers, Jon Hofmeister); Pennsylvania (Jay Parrish, Helen Delano); Utah (Richard Allis, Francis Ashland). The USGS personnel involved in the planning and meeting facilitation are Paula Gori, Peter Lyttle, and John Pallister. The general USGS strategy to address landslide loss reduction was developed with input from State geological surveys, the engineering-geology consulting community, and academic investigators. The strategy was reviewed by the National Research Council, 2004), is summarized in USGS Circular 1244 (Spiker and Gori, 2003) and is endorsed by the AASG. This pilot study, conducted by seven State geological surveys, examines the feasibility of collecting accurate and

  19. The resettlement planning and practice of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Shi Boxun; Yin Zhongwu; Wang Diyou

    2011-01-01

    Migrant resettlement is essential to the success of the Three Gorges Project (TGP), and the smooth implementation of resettlement is ensured by the resettlement planning and effective organization management. In the process of resettlement planning and implementation, systematic legislation and document support system is established; environmental capacity analysis and assets appraisal methods are introduced; resettlement sites are selected through in-depth analysis and comparison; the relationship between resettlement compensation and local development is correctly under- stood and considered, and reasonable resettlement schedules are well prepared. Through the establishment of efficient management system and capital management mode of "static control and dynamic management", as well as the timely adjustment of plan according to actual situations, the resettlement is accomplished smoothly. Thus, the social stability of the reservoir area is ensured ; the economic development of reservoir area is promoted, and it has promoted successfully the improvement of legislation, regulations and techniques for land requisition and resettlement. The paper also discusses the theory and prospective work of resettlement.

  20. The ANURIB project at VECC – Plans and preparations

    Energy Technology Data Exchange (ETDEWEB)

    Chakrabarti, Alok, E-mail: alok@vecc.gov.in; Bandyopadhyay, Arup; Naik, Vaishali; Dechoudhury, Siddhartha; Mondal, Manas; Nabhiraj, P.Y.

    2013-12-15

    VECC is planning to develop a rare ion beam facility called ANURIB (Advanced National facility for Unstable and Rare Isotope Beams) at the upcoming new campus at New Town in Kolkata. ANURIB aims to attract a wide user community in nuclear physics, nuclear-astrophysics, material science and biology and will provide India with world class accelerator facilities. ANURIB will be built around a 50 MeV 100 kW superconducting electron linac (e-Linac) photo-fission driver and is planned to be a combined ISOL and PFS type facility. Construction of the facility will also enable next generation research into production of medical isotopes. In preparation for ANURIB, a low energy ISOL type facility has been built around the existing K130 cyclotron at VECC. Developed for the past decade, this facility was aimed at completing major R and D steps involved in the construction of ANURIB. Presently this facility accelerates beams up to energy of 415 keV/u and recently first radioactive beams have been produced. Development of a 10 MeV Injector Cryo Module for the e-Linac has been started in collaboration with TRIUMF. In this paper the plans for ANURIB project and present status of the R and D activities will be presented.

  1. Screening family planning needs: an operations research project in Guatemala

    Directory of Open Access Journals (Sweden)

    Burkhart Marianne

    2004-05-01

    Full Text Available Abstract Background Public sector health care providers in rural Guatemala have infrequently offered family planning information and services in routine visits. This operations research project tested a strategy to modify certain practices that prevent health workers from proactively screening clients' needs and meeting them. Methods The research design was quasi-experimental with a pretest-posttest-follow-up comparison group design. Health districts, which comprise health centers and posts, were purposively assigned to intervention or comparison groups to assure comparability of the two groups. The strategy was based on a job-aid designed to guide health workers in screening clients' reproductive intentions and family planning needs, help them to offer contraceptive methods if the woman expressed interest, and facilitate the provision of the method chosen at the time of the visit. The strategy was implemented at intervention sites during a period of six months. Upon completion of post-intervention measurements, the strategy was scaled up to the comparison sites, and a follow-up assessment was conducted nine months later. Results were evaluated by conducting three rounds of exit interviews with women exposed to the risk of unwanted pregnancy. Results Study results showed a two to five-fold increase in providers' screening of clients' reproductive intentions. The proportion of clients who received information about contraceptives increased from 8% at the baseline to 42% immediately post-intervention, and 36% at the follow-up survey. The intervention also proved successful in improving the role service providers play in offering women a chance to ask questions and assisting women in making a selection. The proportion of women who received a method, referral or appointment increased and remained high in the intervention group, although no change was seen in the comparison group after their participation in the strategy. Conclusion The easy

  2. Solid waste information and tracking system server conversion project management plan

    Energy Technology Data Exchange (ETDEWEB)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  3. 25 CFR 170.436 - How are public hearings for IRR planning and projects funded?

    Science.gov (United States)

    2010-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Public Hearings § 170.436 How are public hearings for IRR planning and projects funded... 25 Indians 1 2010-04-01 2010-04-01 false How are public hearings for IRR planning and projects...

  4. STRATEGY AND PLANNING - PROJECT FOR MONITORING STRICTO SENSU POSTGRADUATE ALUMNI

    Directory of Open Access Journals (Sweden)

    Emerson Antonio Maccari

    2014-07-01

    Full Text Available The Coordination of Improvement of Higher Education Personnel (CAPES has been contributing to the development of post-graduate studies in Brazil, through its system of evaluation. Lately, CAPES signaled the importance of follow the professional performance of the alumni as a way to measure the quality of courses. One difficulty reported by institutions that intend to recognize the trajectory of its graduates is to compile a lot of isolated and outdated data. In order to structure the data collection and to assist educational managers in decision making, we propose the development of a system that enables the evolution of the students and alumni professional career, in order to diagnose the influence of the courses. Based on literature review, this study presents an analysis and makes recommendations about the Monitoring Alumni Project planning. As a result, it is expected that the analysis will serve as a driver for conducting the project, aiming to contribute to the academic reflections, and in practice, contribute to improve educational projects quality.

  5. Strategic Planning of Water System Projects in Alexandria

    Directory of Open Access Journals (Sweden)

    Hesham A. Abdel Khalek

    2016-09-01

    Full Text Available Alexandria is one of the major cities on the Mediterranean Sea. Over the past 40 years, Alexandria‟s population has doubled. Therefore Water requirements are continuously increasing due to population increase. This paper develops a framework to support decision-makers in water sector for planning major projects in Alexandria till 2037. Firstly, data gathering has been conducted and population forecasting is calculated by arithmetic and geometric methods then the future water demands are calculated, after that major projects outline is proposed. Finally the projects priorities will be determined by applying two methods of solving Multiple Criteria Decision Making MCDM problems. The first method is The Weighted Scoring Method; WSM is a powerful and flexible method of comparing similar items against a standard, prioritized list of requirements or criteria. The second method is Analytical Hierarchy Process. AHP is based on comparative evaluation method. Then Results will be analyzed. First, it was focused on the difference of the criteria weight of alternatives between the two methods. Second, it was compared the preference orders of alternatives between them, there were not much of differences in the final results. The results offered some evidence that AHP makes the selection process very transparent.

  6. Development plan. High activity-long living wastes project. Abstract; Plan de developpement. Projet HAVL. Resume

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This brochure presents the actions that the ANDRA (the French national agency of radioactive wastes) has to implement in the framework of the project of high activity-long living (HALL) radioactive wastes (HAVL project) conformably to the requirements of the program defined in the law from June 28, 2006 (law no 2006-739). This law precises the three, complementary, research paths to explore for the management of this type of wastes: separation and transmutation of long-living radioactive elements, reversible disposal in deep geologic underground, and long duration storage. The ANDRA's action concerns the geologic disposal aspect. The following points are presented: the HALL wastes and their containers, the reversible disposal procedure, the HAVL project: financing of researches, storage concepts, development plan of the project (dynamics, information and dialogue approach, input data, main steps, schedule); the nine programs of the HAVL project (laboratory experiments and demonstration tests, surface survey, scientific program, simulation program, surface engineering studies and technological tests, information and communication program, program of environment and facilities surface observation and monitoring, waste packages management, monitoring and transport program, disposal program); the five transverse technical and scientific activities (safety, reversibility, cost, health and occupational safety, impact study). (J.S.)

  7. Cohasset/Panuke project: Benefits plan decision report (and) development plan decision report

    Energy Technology Data Exchange (ETDEWEB)

    1990-08-01

    The Cohasset/Panuke project will involve the recovery of over 5.5 million m{sup 3} of light oil from fields in the Nova Scotia offshore. Production is to occur seasonally over a 6-year period starting 1992. Facilities will include steel wellhead jackets in each field, a subsea flowline, a jackup rig for production equipment, and a storage tanker. Shuttle tankers will periodically unload oil from the storage tanker for transport to market. A review of the project's development plan was undertaken by the Canada-Nova Scotia Offshore Petroleum Board and the decisions of that board are presented. The project is not seen to be a large one by offshore standards, and the concept of a minimal cost development was considered appropriate. A large portion of the equipment used will be leased, much of which is not available in Canada; however, opportunities exist for Canadian companies to fabricate wellhead jackets, production facilities and other equipment, and to modify leased equipment. Employment opportunities to be created are significant, and can likely be filled with existing Canadian and Nova Scotian expertise. No significant impact on social infrastructure is anticipated. It was also found that the project does not pose a major hazard to the environment or fisheries in the project area, provided that proper procedures are put in place and followed. 2 figs.

  8. 76 FR 48853 - FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-08-09

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 70, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May...

  9. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    Science.gov (United States)

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  10. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    Science.gov (United States)

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  11. FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-10-01

    Phase 1 of the HEDR Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations from limited radionuclides, in a limited geographical area and time period. Phase 1 ended in FY 1990. In February 1991, the TSP decided to shift the project planning approach away from phases--which were centered around completion of major portions of technical activities--to individual fiscal years (FYs), which span October of one year through September of the next. Therefore, activities that were previously designated to occur in phases are now designated in an integrated schedule to occur in one or more of the next fiscal years into FY 1995. Task plans are updated every 6 months. In FY 1992, scientists will continue to improve Phase 1 data and models to calculate more accurate and precise dose estimates. The plan for FY 1992 has been prepared based on activities and budgets approved by the Technical Steering Panel (TSP) at its meeting on August 19--20, 1991. The activities can be divided into four categories: (1) model and data evaluation activities, (2) additional dose estimates, (3) model and data development activities, and (4) technical and communication support. 3 figs., 2 tabs.

  12. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  13. Site study plan for Transportation, Deaf Smith County Site, Texas: Preliminary draft

    Energy Technology Data Exchange (ETDEWEB)

    1987-06-01

    This site study plan describes transportation field studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. The studies are needed to identify and assess potential project impacts to transportation infrastructure and systems in the project vicinity and along potential transportation routes to the site across the State of Texas. The studies are also needed to locate and design project transportation facilities, and to evaluate and design impact mitigation. After identifying the transportation information requirements needed to comply with Federal, State, and local regulations and repository program requirements, the site study plan describes the study design and rationale, the field data collection procedures and equipment, the data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs for the characterization of site vicinity rail corridors and highway corridors, characterization of alternative statewide transportation routes, monitoring of site characterization effects on transportation, characterization of aircraft overflight patterns and hazardous material transportation patterns, and assessment of emergency response preparedness along alternative statewide transportation routes. 34 refs., 10 figs., 2 tabs.

  14. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  15. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-07-02

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... 1982, the Bureau of Reclamation developed and published the Criteria for Evaluating Water...

  16. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-11-16

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The following Water Management Plans are... Bureau of Reclamation developed and published the Criteria for Evaluating Water Management...

  17. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-06-05

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Bureau of Reclamation developed and published the Criteria for Evaluating Water Management...

  18. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Science.gov (United States)

    2011-04-05

    ... Bureau of Reclamation Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement... Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project. The Washington State...; and (4) identify a comprehensive approach for efficient management of basin water supplies....

  19. Business planning innovative projects: the essence of technology, advantages and disadvantages

    Directory of Open Access Journals (Sweden)

    S.V. Knyaz

    2012-06-01

    Full Text Available The article substantiates the necessity to develop technology business planning innovative projects. Arguments made by the ground analysis of the advantages and disadvantages of existing business planning technologies.

  20. Solid Waste Information and Tracking System Client Server Conversion Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    GLASSCOCK, J.A.

    2000-02-10

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  1. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Deffenbaugh, M.L.

    1998-05-28

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464.

  2. Projected effects of proposed chloride-control projects on shallow ground water; preliminary results for the Wichita River basin, Texas

    Science.gov (United States)

    Garza, Sergio

    1983-01-01

    The U.S. Army Corps of Engineers' plan to control the natural chloride pollution in the Wichita River basin includes the construction of Truscott Brine Lake on a tributary of the North Wichita River. In connection with the proposed brine lake, the U.S. Geological Survey was requested to: (1) Define the existing ground-water conditions in the shallow fresh-water system of the project area; and (2) project the post-construction effects of the proposed lake on the fresh-water aquifer, especially in relation to hydraulic-head changes but also with respect to possible changes in the chemical quality of the ground water.

  3. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  4. Visual Assessment on Coastal Cruise Tourism: A Preliminary Planning Using Importance Performance Analysis

    Science.gov (United States)

    Trisutomo, S.

    2017-07-01

    Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar

  5. Equity in transportation: new approach in transport planningpreliminary results of case study in Cracow

    Directory of Open Access Journals (Sweden)

    Lidia ZAKOWSKA

    2014-09-01

    Full Text Available The goal of the paper is to present the concept of equity as a new approach in transport and land-use planning. This concept is consistent with the objectives of sustainable development and it is becoming more common in European and world literature. Understanding the idea of equity in the context of the transport system development is very important in creating sustainable cities and regions without discriminating any social groups and creating a cohesive society not exposed to social exclusion due to lack of access to primary and secondary activities. The paper presents some results of the preliminary analysis on transport equity in Cracow. The basic equity level which has been considered here concerns senior citizens, older people living in Cracow area, in terms of their accessibility to transport infrastructure. Taking into account living conditions of elderly pedestrians, contour measures were used, in order to determine accessibility as equity indicator.

  6. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  7. Immigration, health and diversity management: Preliminary developments of a project in neighborhoods of Catalonia

    Directory of Open Access Journals (Sweden)

    Dan Rodríguez-García

    2007-09-01

    Full Text Available This article presents an ongoing research project on immigration, health, and socio-cultural diversity , and offers preliminary information on the theoretical and socio-demographic context of this investigation. The objective of the project, funded by the Department of Health of the Autonomous Government of Catalonia, Spain, is to analyse the socioeconomic and cultural factors involved in health and the access to the formal health system of a few major migrant communities and ethnic minorities living in high-priority neighbourhoods in Catalonia. The results of this project, which will come fundamentally from ethnographic research, aim to give suggestions for improving health conditions for the population and to provide to those professionals working in the public health care system with some conceptual and practical tools for improving intercultural communication between themselves and their patients, as well as for detecting, preventing, and resolving problems in everyday practice.

  8. Evaluating Levels of Project Planning and their Effects on Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Godwin Idoro

    2012-11-01

    Full Text Available This study compares the level of project planning on public andprivate sectors projects and its impact on performance. Thepurpose is to create awareness of the level and effectivenessof the planning done by public and private clients in the deliveryof construction projects. A questionnaire survey administeredto a sample of 130 client representatives selected by stratifi edrandom sampling from the population of public and private clientsin the Nigerian construction industry is used and analysed usingdescriptive statistics, the t-test and Spearman correlation test. Theresults show that the level of preconstruction planning on privatesector projects is higher than that of public sector projects whilethe level of contract planning done by the latter is higher thanthat of the former. Furthermore, the performance of private sectorprojects is higher than that of public sector projects in many of theparameters used. However, the level of preparation of life-cyclecharts that concern project delivery time in both public and privatesectors projects is low and the level of project planning in the twocategories of projects has a limited impact on project performance.The understanding of how public and private sectors projectsperform in planning and its impact are expected to assist publicand private clients to know the challenges ahead of them in theireffort to improve the planning and performance of their projects.

  9. Planning the human variome project: the Spain report.

    Science.gov (United States)

    Kaput, Jim; Cotton, Richard G H; Hardman, Lauren; Watson, Michael; Al Aqeel, Aida I; Al-Aama, Jumana Y; Al-Mulla, Fahd; Alonso, Santos; Aretz, Stefan; Auerbach, Arleen D; Bapat, Bharati; Bernstein, Inge T; Bhak, Jong; Bleoo, Stacey L; Blöcker, Helmut; Brenner, Steven E; Burn, John; Bustamante, Mariona; Calzone, Rita; Cambon-Thomsen, Anne; Cargill, Michele; Carrera, Paola; Cavedon, Lawrence; Cho, Yoon Shin; Chung, Yeun-Jun; Claustres, Mireille; Cutting, Garry; Dalgleish, Raymond; den Dunnen, Johan T; Díaz, Carlos; Dobrowolski, Steven; dos Santos, M Rosário N; Ekong, Rosemary; Flanagan, Simon B; Flicek, Paul; Furukawa, Yoichi; Genuardi, Maurizio; Ghang, Ho; Golubenko, Maria V; Greenblatt, Marc S; Hamosh, Ada; Hancock, John M; Hardison, Ross; Harrison, Terence M; Hoffmann, Robert; Horaitis, Rania; Howard, Heather J; Barash, Carol Isaacson; Izagirre, Neskuts; Jung, Jongsun; Kojima, Toshio; Laradi, Sandrine; Lee, Yeon-Su; Lee, Jong-Young; Gil-da-Silva-Lopes, Vera L; Macrae, Finlay A; Maglott, Donna; Marafie, Makia J; Marsh, Steven G E; Matsubara, Yoichi; Messiaen, Ludwine M; Möslein, Gabriela; Netea, Mihai G; Norton, Melissa L; Oefner, Peter J; Oetting, William S; O'Leary, James C; de Ramirez, Ana Maria Oller; Paalman, Mark H; Parboosingh, Jillian; Patrinos, George P; Perozzi, Giuditta; Phillips, Ian R; Povey, Sue; Prasad, Suyash; Qi, Ming; Quin, David J; Ramesar, Rajkumar S; Richards, C Sue; Savige, Judith; Scheible, Dagmar G; Scott, Rodney J; Seminara, Daniela; Shephard, Elizabeth A; Sijmons, Rolf H; Smith, Timothy D; Sobrido, María-Jesús; Tanaka, Toshihiro; Tavtigian, Sean V; Taylor, Graham R; Teague, Jon; Töpel, Thoralf; Ullman-Cullere, Mollie; Utsunomiya, Joji; van Kranen, Henk J; Vihinen, Mauno; Webb, Elizabeth; Weber, Thomas K; Yeager, Meredith; Yeom, Young I; Yim, Seon-Hee; Yoo, Hyang-Sook

    2009-04-01

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of data from diverse studies proves this perception inaccurate at best, and at worst, an impediment for further efforts to characterize the variation in the human genome. Because variation in genotype and environment are the fundamental basis to understand phenotypic variability and heritability at the population level, identifying the range of human genetic variation is crucial to the development of personalized nutrition and medicine. The Human Variome Project (HVP; http://www.humanvariomeproject.org/) was proposed initially to systematically collect mutations that cause human disease and create a cyber infrastructure to link locus specific databases (LSDB). We report here the discussions and recommendations from the 2008 HVP planning meeting held in San Feliu de Guixols, Spain, in May 2008.

  10. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  11. Preliminary Technology Maturation Plan for Immobilization of High-Level Waste in Glass Ceramics

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Crum, Jarrod V.; Sevigny, Gary J.; Smith, G L.

    2012-09-30

    A technology maturation plan (TMP) was developed for immobilization of high-level waste (HLW) raffinate in a glass ceramics waste form using a cold-crucible induction melter (CCIM). The TMP was prepared by the following process: 1) define the reference process and boundaries of the technology being matured, 2) evaluate the technology elements and identify the critical technology elements (CTE), 3) identify the technology readiness level (TRL) of each of the CTE’s using the DOE G 413.3-4, 4) describe the development and demonstration activities required to advance the TRLs to 4 and 6 in order, and 5) prepare a preliminary plan to conduct the development and demonstration. Results of the technology readiness assessment identified five CTE’s and found relatively low TRL’s for each of them: • Mixing, sampling, and analysis of waste slurry and melter feed: TRL-1 • Feeding, melting, and pouring: TRL-1 • Glass ceramic formulation: TRL-1 • Canister cooling and crystallization: TRL-1 • Canister decontamination: TRL-4 Although the TRL’s are low for most of these CTE’s (TRL-1), the effort required to advance them to higher values. The activities required to advance the TRL’s are listed below: • Complete this TMP • Perform a preliminary engineering study • Characterize, estimate, and simulate waste to be treated • Laboratory scale glass ceramic testing • Melter and off-gas testing with simulants • Test the mixing, sampling, and analyses • Canister testing • Decontamination system testing • Issue a requirements document • Issue a risk management document • Complete preliminary design • Integrated pilot testing • Issue a waste compliance plan A preliminary schedule and budget were developed to complete these activities as summarized in the following table (assuming 2012 dollars). TRL Budget Year MSA FMP GCF CCC CD Overall $M 2012 1 1 1 1 4 1 0.3 2013 2 2 1 1 4 1 1.3 2014 2 3 1 1 4 1 1.8 2015 2 3 2 2 4 2 2.6 2016 2 3 2 2 4 2 4

  12. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  13. Site Study Plan for Aesthetics, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    Energy Technology Data Exchange (ETDEWEB)

    1987-06-01

    The Aesthetic Site Study Plan describes a field program consisting of identification of the visually affected area; determination of scenic quality, visual sensitivity, and visual management classes of the site and vicinity; and analysis of the level of visual contrast that would be created by the project. Field ratings of scenic quality, visual sensitivity, and visual contrast will be supplemented by a public perception survey designed to incorporate the views of the public. This plan describes the need for the study, the study design, data management and use, schedule for proposed activities, and quality assurance program. This study will provide data needed to satisfy requirements contained in, or derived from, SRPO Requirement Document (SRP-RD). 35 refs., 6 figs., 2 tabs.

  14. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    ... Energy Regulatory Commission Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing... Competing Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit... 8:30 a.m. on the next regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund...

  15. EUBerry: Competitiveness and marketing strategies of sustainable berries validated for improved health benefits - Introduction to the project and preliminary results

    NARCIS (Netherlands)

    Groot, M.J.; Roelofs, P.F.M.M.; Kaim, E.; Sijtsema, S.J.; Zimmermann, K.L.; Zmarlicki, K.

    2014-01-01

    The EUBerry project is not only building on technical research but also studies berry production and consumption from a social sciences perspective. This paper aims to describe the approach used in the EUBerry project about business economics as well as marketing. In addition some preliminary

  16. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  17. SolarOil Project, Phase I preliminary design report. [Solar Thermal Enhanced Oil Recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Baccaglini, G.; Bass, J.; Neill, J.; Nicolayeff, V.; Openshaw, F.

    1980-03-01

    The preliminary design of the Solar Thermal Enhanced Oil Recovery (SolarOil) Plant is described in this document. This plant is designed to demonstrate that using solar thermal energy is technically feasible and economically viable in enhanced oil recovery (EOR). The SolarOil Plant uses the fixed mirror solar concentrator (FMSC) to heat high thermal capacity oil (MCS-2046) to 322/sup 0/C (611/sup 0/F). The hot fluid is pumped from a hot oil storage tank (20 min capacity) through a once-through steam generator which produces 4.8 MPa (700 psi) steam at 80% quality. The plant net output, averaged over 24 hr/day for 365 days/yr, is equivalent to that of a 2.4 MW (8.33 x 10/sup 6/ Btu/hr) oil-fired steam generator having an 86% availability. The net plant efficiency is 57.3% at equinox noon, a 30%/yr average. The plant will be demonstrated at an oilfield site near Oildale, California.

  18. Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-19

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

  19. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  20. 60 FR 56561 - Jump Creek Water Quality Planning Project Owyhee County

    Science.gov (United States)

    1995-11-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF AGRICULTURE Natural Resources Conservation Service Jump Creek Water Quality Planning Project Owyhee County AGENCY... impact statement is not being prepared for the Jump Creek Water Quality Planning Project, Owyhee...

  1. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans.

  2. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-19

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

  3. Industrial Fuel Gas Demonstration Plant Project. Management plan (Deliverable No. 1)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-05-31

    This Project Management Plan establishes the organization and procedures by which the Memphis Medium-Btu Fuel Gas Demonstration Plant will be managed and defines the responsibilities and functions of project participants. This plan should not be construed as modifying contract provisions or documents in any way. It applies mainly to Phase I activities; the conceptual design and development of the demonstration plant. Plans for Phases II and III will be prepared before these phases are initiated. This management plan is intended to be a working document to be revised as the needs of the project dictate. The looseleaf format will facilitate changes by making it possible to add and remove pages.

  4. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  5. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  6. Strategic plan for the Coordinated Intermountain Restoration Project

    Science.gov (United States)

    Pyke, David A.; Pellant, Michael L.

    2002-01-01

    agencies within the region. U.S. Geological Survey funds will support (1) continued development of VegSpec, a computer program that is a restoration expert system, (2) research to examine changes in ecosystem processes when native plant-dominated communities shift to communities dominated by exotic annual grasses, and (3) research to address mechanisms for establishing native plants in locations dominated by exotic annual grasses. Through these initial funds, USGS hopes to leverage additional research with other agencies (e.g., BLM’s Great Basin Restoration Initiative or the Native Plant Materials Development Project, which is an interagency program to supply and manage native plant materials for restoration and rehabilitation on Federal lands) or funding organizations (e.g., the U.S. Department of Agriculture’s [USDA] National Research Initiative Competitive Grants Program, or the USDA’s and U.S. Department of the Interior’s [USDOI] Joint Fire Science Program), and to obtain additional research partners (e.g., university or Federal scientists) willing to expand this effort to address all aspects of this strategic plan.

  7. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  8. Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2012-10-31

    This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

  9. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site.

  10. 60 FR 29708 - Travel Management Plan for Owyhee Reservoir, Owyhee Project, Oregon

    Science.gov (United States)

    1995-06-05

    ... Travel Management Plan for Owyhee Reservoir, Owyhee Project, Oregon agency: Bureau of Reclamation... Travel Management Plan for Reclamation lands in the vicinity of Owyhee Reservoir, Oregon. The purpose of... date: The effective date of the travel management plan is June 5, 1995. addresses: Copies of the...

  11. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-10-22

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... and published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose of...

  12. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-10-24

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... developed and published the Criteria for Evaluating Water Management Plans (Criteria). For the purpose...

  13. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY... Refuge Water Management Plans (Refuge Criteria). Several entities have each developed a Refuge Water...) 978-5281 (TDD 978-5608). SUPPLEMENTARY INFORMATION: The following Refuge Water Management Plans...

  14. 25 CFR 170.415 - What is pre-project planning?

    Science.gov (United States)

    2010-04-01

    ... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415...

  15. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    BUSSELL, J.H.

    1999-08-02

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K compliance for Project W-151, Tank 101-AZ Waste Retrieval System. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. Two mixer pumps and instrumentation have been or are planned to be installed in waste tank 101-AZ to demonstrate solids mobilization. The information and experience gained during this process test will provide data for comparison with sludge mobilization prediction models and provide indication of the effects of mixer pump operation on an Aging Waste Facility tank. A limited description of system dates, functions, interfaces, potential Y2K problems, and date resolutions is presented. The project is presently on hold, and definitive design and procurement have been completed. This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  16. Climate Change Impact on Hydrological Extremes: Preliminary Results from the Polish-Norwegian Project

    Science.gov (United States)

    Romanowicz, Renata J.; Bogdanowicz, Ewa; Debele, Sisay E.; Doroszkiewicz, Joanna; Hisdal, Hege; Lawrence, Deborah; Meresa, Hadush K.; Napiórkowski, Jarosław J.; Osuch, Marzena; Strupczewski, Witold G.; Wilson, Donna; Wong, Wai Kwok

    2016-04-01

    This paper presents the background, objectives, and preliminary outcomes from the first year of activities of the Polish-Norwegian project CHIHE (Climate Change Impact on Hydrological Extremes). The project aims to estimate the influence of climate changes on extreme river flows (low and high) and to evaluate the impact on the frequency of occurrence of hydrological extremes. Eight "twinned" catchments in Poland and Norway serve as case studies. We present the procedures of the catchment selection applied in Norway and Poland and a database consisting of near-natural ten Polish and eight Norwegian catchments constructed for the purpose of climate impact assessment. Climate projections for selected catchments are described and compared with observations of temperature and precipitation available for the reference period. Future changes based on those projections are analysed and assessed for two periods, the near future (2021-2050) and the far-future (2071-2100). The results indicate increases in precipitation and temperature in the periods and regions studied both in Poland and Norway.

  17. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-09-09

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

  18. It Can Be Done! Planning and Process for Successful Collection Management Projects

    OpenAIRE

    Rosen, Fran; Grudzien, Pamela; Hisle, W. Lee; Tully, Patricia A.

    2014-01-01

    Many academic libraries face the challenge of decreasing the size of print collections. This paper offers perspectives on a range of activities for successful projects. At Connecticut College, W. Lee Hisle found that, with proper planning and execution, a successful Collection Management Project can be completed without substantial campus turmoil. Hisle discusses project principles, communications strategy used, data used to “sell” the project, and lessons learned. This project allowed the bo...

  19. Preliminary design study of underground pumped hydro and compressed-air energy storage in hard rock. Volume 4: System planning studies

    Science.gov (United States)

    1981-04-01

    Preliminary design and planning studies of water compensated compressed air energy storage (CAES) and underground pumped hydroelectric (UPH) power plants are presented. The costs of the CAES and UPH plant designs, and the results of economic evaluations performed for the PEPCO system are presented. The PEPCO system planning analysis was performed in parallel stages with plant design development. Analyses performed early in the project indicated a requirement for 1000 MW/10,000 MWH of energy storage on a daily operating schedule, with economic installation in two segments of 500 MW in 1990 and 1997. The analysis was updated eighteen months later near the end of the project to reflect the impact of new growth projections and revised plant costs. The revised results indicated economic installations for either UPH or CAES of approximately 675 MW/6750 MWH on a daily cycle, installed in blocks of approximately 225 MW in 1990, 1993 and 1995. Significant savings in revenue requirements and oil fuel over the combustion turbine alternative were identified for both CAES and UPH.

  20. Software for Project-Based Learning of Robot Motion Planning

    Science.gov (United States)

    Moll, Mark; Bordeaux, Janice; Kavraki, Lydia E.

    2013-01-01

    Motion planning is a core problem in robotics concerned with finding feasible paths for a given robot. Motion planning algorithms perform a search in the high-dimensional continuous space of robot configurations and exemplify many of the core algorithmic concepts of search algorithms and associated data structures. Motion planning algorithms can…

  1. Contractors’ Strategic Approaches to Risk Assessment Techniques at Project Planning Stage

    OpenAIRE

    Ahmad Zaini, Afzan; Endut, Intan Rohani; Takim, Roshana

    2011-01-01

    Abstract — The construction industry is still plagued by poor quality, poor workmanship, poor safety and health environment, and poor practices. The current main problem in the Malaysian Construction Industry is delayed projects under the Ninth Malaysia Plan. The idea of introducing formal risk assessment among Malaysian contractors during the project planning stage is a proactive approach to achieve project objectives. Therefore, this research intends to achieve the following objectives: (1)...

  2. ERGONOMIC ASPECTS IN THE PLANNING AND EXECUTION OF PROJECTS: A TEXTILE PRODUCTS DISTRIBUTION CENTER PROJECT CASE STUDY

    Directory of Open Access Journals (Sweden)

    Emerson Lourenço da Silva

    2013-01-01

    Full Text Available The planning and execution phases of a distribution center project of a large textile industry was made, evaluating the ergonomic aspects related to the operations to be performed in the facility and staff anthropometric data. The ergonomic collaborative analysis of the tasks associated with the method of movement plotting, guided the planning of the picking, manual induction and order consolidation areas from the distribution center. Using this methodology, it was possible to obtain a proper ergonomically project planning and execution of the three studied areas.

  3. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  4. Preliminary publications book 2 from project on mineral resources, metallogenesis, and tectonics of northeast Asia

    Science.gov (United States)

    Nokleberg, Warren J.; Miller, Robert J.; Naumova, Vera V.; Khanchuk, Alexander I.; Parfenov, Leonid M.; Kuzmin, Mikhail I.; Bounaeva, Tatiana M.; Obolenskiy, Alexander A.; Rodionov, Sergey M.; Seminskiy, Zhan V.; Diggles, Michael F.

    2003-01-01

    This is the Web version of a CD-ROM publication. This report consists of summary major compilations and syntheses accomplished in the six-year project through April 2003 for the study on the Mineral Resources, Metallogenesis, and Tectonics of Northeast Asia (Eastern and Southern Siberia, Mongolia, Northeastern China, South Korea, and Japan). The major scientific goals and benefits of the project are to: (1) provide a comprehensive international data base on the mineral resources of the region that is the first, extensive knowledge available in English; (2) provide major new interpretations of the origin and crustal evolution of mineralizing systems and their host rocks, thereby enabling enhanced, broad-scale tectonic reconstructions and interpretations; and (3) promote trade and scientific and technical exchanges between the North America and Northeast Asia. Data from the project are providing sound scientific data and interpretations for commercial firms, governmental agencies, universities, and individuals that are developing new ventures and studies in the project area, and for land-use planning studies that deal with both mineral potential issues. Northeast Asia has vast potential for known and undiscovered mineral deposits; however, little information existed in English in the West until publication of products from this project. Consequently, data and interpretations from the project are providing basic knowledge for major scientific, commercial, national, and international endeavors by other interested individuals and groups.

  5. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and

  6. Design and implementation of a financial planning and tracking system for the Nova Project

    Energy Technology Data Exchange (ETDEWEB)

    Holcomb, F.

    1982-01-01

    The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation.

  7. BETTER PROJECT PLANNING AND CONTROL THROUGH THE USE OF SYSTEM ANALYSIS AND MANAGEMENT TECHNIQUES.

    Science.gov (United States)

    COOK, DESMOND L.

    THE COMBINED APPLICATION OF SYSTEM ANALYSIS AND MANAGEMENT TECHNIQUES IS DESCRIBED AS AN EFFECTIVE WAY TO ACHIEVE OPTIMUM RESULTS IN THE PLANNING AND EXECUTION OF PROJECTS IN THE FIELD OF EDUCATION. PROJECTS OF THIS TYPE ARE GENERALLY FINITE, COMPLEX, HOMOGENOUS, AND NONREPETITIVE. SYSTEM ANALYSIS OF A PROJECT INCLUDES ITS DISASSEMBLY INTO…

  8. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    The bestselling project management text for students and professionals-now updated and expanded This Eleventh Edition of the bestselling ""bible"" of project management maintains the streamlined approach of the prior editions and moves the content even closer to PMI''s Project Management Body of Knowledge (PMBOK). New content has been added to this edition on measuring project management ROI, value to the organization and to customers, and much more. The capstone ""super"" case on the ""Iridium Project"" has been maintained, covering all aspects of project management. Increased use of sideba

  9. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    Energy Technology Data Exchange (ETDEWEB)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  10. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects.

    Science.gov (United States)

    Shin, Yoonseok

    2015-01-01

    Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  11. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6: simulation design and preliminary results

    Directory of Open Access Journals (Sweden)

    B. Kravitz

    2015-10-01

    Full Text Available We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP. This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6, builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1 GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  12. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6): simulation design and preliminary results

    Science.gov (United States)

    Kravitz, B.; Robock, A.; Tilmes, S.; Boucher, O.; English, J. M.; Irvine, P. J.; Jones, A.; Lawrence, M. G.; MacCracken, M.; Muri, H.; Moore, J. C.; Niemeier, U.; Phipps, S. J.; Sillmann, J.; Storelvmo, T.; Wang, H.; Watanabe, S.

    2015-10-01

    We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP). This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6), builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1) GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  13. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  14. A preliminary examination of audience-related communications issues for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.

    1991-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation doses people may have received from exposure to radioactive materials released during past operations at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project was initiated in response to public concerns about possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to effectively communicate to the many different concerned audiences. Accordingly, the TSP directed PNL to examine methods for communicating causes and effects of uncertainties in the dose estimates. After considering the directive and discussing it with the Communications Subcommittee of the TSP, PNL undertook a broad investigation of communications methods to consider for inclusion in the TSP's current communications program. As part of this investigation, a literature review was conducted regarding risk communications. A key finding was that, in order to successfully communicate risk-related information, a thorough understanding of the knowledge level, concerns and information needs of the intended recipients (i.e., the audience) is necessary. Hence, a preliminary audience analysis was conducted as part of the present research. This report summarizes the results of this analysis. 1 ref., 9 tabs.

  15. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  16. Intelliface - Intelligent Assistant for Interfacing Diagnosis and Planning Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To integrate automated diagnosis and automated planning functions, one must translate diagnosed system faults to corresponding changes in resource availabilities....

  17. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  18. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  19. Springfield/L-COG Energy Plan Implementation Program, Internal Energy Management Project: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lane Council of Governments (Or.); Tumidaj, Les

    1985-09-01

    The Internal Energy Management Project was developed as a component of the Springfield/L-COG Energy Plan Implementation Program. The project also took advantage of the ground work laid by the Lane Council of Governments through the Lane County Electric Energy Planning Program. This program, conducted in 1982 and 1983, developed detailed recommendations for Lane County cities concerning energy management and planning. Based on these recommendations, many jurisdictions committed themselves to implement energy management programs. Initially, the participating cities included Springfield, Veneta, Oakridge, Creswell, and Lowell. Two other local governments - Florence and Lane County - requested assistance once the project commenced.

  20. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  1. Climatic Action Plan Project for the state of Veracruz (Mexico)

    Science.gov (United States)

    Tejeda, A.; Ochoa, C.

    2007-05-01

    With financing of the British Government and support of the National Institute of Ecology, from April of 2006 to March of 2008 an action plan which intends variability effects and climatic change for the state of Veracruz will be made. This plan will be taken to the state government and will be spread out to manufacturers, industrialists and population. Throughout the Gulf of Mexico, the state of Veracruz is a 745 km coast in length with a width that goes from 156 km in the center to 47 km in the north. The state has large mountains, forests, plains, rivers, cascades, lagoons and coasts. Veracruz is the 10th largest state in Mexico with a 72,420 km2 surface, it is located between 17°00' and 22°28' north latitude and between 93°95' and 98°38' west longitude. Because of the orographic effect, the Sierra Madre Oriental causes the existence of many types of climate, from dry to tropical forest, going through snow on the top of the Pico de Orizaba (5747m of altitude). The wind affects the coasts by not allowing to fish during a hundred days a year (particularly in winter), and on summer tropical waves and occasionally hurricanes affect rivers causing overflow and urban floods in fields. These phenomena do not have a regular affectation; they are subject to climate variability effects. Veracruz is the third state with most population in the country (7.1 million people in 2005), only surpassed by the state of Mexico and Mexico City. Although it occupies 3.7% of the national territory, Veracruz has 6.9% of human population in the country, and is the 6th state of PIB national contribution (240 thousands of millions pesos approximately). Of the possible effects of the climatic change the following can be expected: , , : Most of the coasts of the Gulf of Mexico, low and sandy, less of a meter on the sea level, represent the most vulnerable territory of Veracruz. Towns will be affected, the saline water will infiltrate until the phreatic mantles and the coast electrical

  2. Process for planning and control of software projects using XedroGESPRO

    Directory of Open Access Journals (Sweden)

    Jacqueline Marín-Sánchez

    2014-04-01

    Full Text Available The software project management in Cuba has become a key area for improving production processes and decisionmaking in organizations. Several models and standards for process improvement, related with project management, proposed best practices on issues of planning and control of projects. However, they are generic guidelines that describe only those activities to execute, leaving the responsibility for implementing to organizations, using sometimes , expensive proprietary informatics tools to achieve these goals. This research proposes a process for planning and control of software projects using Xedro-GESPRO: an open-source software tool for project management domestically implemented. The proposal is successfully being applied by the network of production centers of the Informatic Sciences University of Cuba, observing greater efficiency and effectiveness in the planning and control of their projects.

  3. Modelling for Maritime Spatial Planning: Concepts, tools and practical examples from the BaltSeaPlan project

    DEFF Research Database (Denmark)

    Mohn, Christian; Kotta, J.; Dahl, Karsten;

    This study summarizes the most important aspects of integrating modelling into Maritime Spatial Planning (MSP) and Strategic Environmental Assessments (SEA). The results are part of an evaluation carried out in the framework of the EU BaltSeaPlan (BSP) project. The findings are based on a multi......-disciplinary assessment carried out by a working group composed of spatial planners, managers and environmental scientists under participation of the BSP community through a number of workshops and group discussions. The overall goal of the study was to identify the most important planning questions and the modelling...

  4. 76 FR 18214 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Science.gov (United States)

    2011-04-01

    ... a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage... Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the... inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2055-087. c. Date Filed...

  5. 76 FR 18213 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Science.gov (United States)

    2011-04-01

    ... a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage... Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the... inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2778-062. c. Date Filed...

  6. On preliminary budget compilation of architectural projects%论建筑工程概预算编制问题

    Institute of Scientific and Technical Information of China (English)

    孔小芳

    2015-01-01

    The paper illustrates the definition of the preliminary budget in architectural projects and its included contents,analyzes some existing problems in its compilation of the architectural project,and points out the advanced preliminary budget method can be adopted for observing the market,so it is the solutions to improving preliminary budget compilation system,in order to ensured engineering quality improving.%对建筑工程概预算的定义及内容进行了阐述,并对建筑工程概预算编制存在的问题作了分析,提出了洞察市场、采用先进的概预算方法、健全概预算编制制度等解决措施,以确保工程质量的提高。

  7. 77 FR 31610 - FFP Project 110, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-05-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 110, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 1, 2012, the...

  8. 78 FR 18335 - FFP Project 121, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-03-26

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Project 121, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2013,...

  9. Landlord project multi-year work plan fiscal year 1998

    Energy Technology Data Exchange (ETDEWEB)

    Knollmeyer, P. M.

    1997-09-19

    The mission of Landlord Project is to preserve, upgrade, maintain, and forecast cost effective general infrastructure activities to facilitate the Hanford Site cleanup mission. Specific functions and services provided by Landlord Project include utilities (i.e. steam, water, sanitary sewer, solid waste disposal, electrical and telecommunication distribution), transportation, general purpose facilities (includes general support shops and laboratories), services, and energy and land use management. All Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Hanford Site Landlord Project will be competitive with commercially provided services to offer the best price, quality, and service available.

  10. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  11. Construction Projects Focus on Evaluation and Its Benefits by Pre-planning

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    Evaluation and pre-planning are two critical factors which give the project organization and project manager the opportunity to plan, and avoid unexpected situations in the construction process before it starts. The aim of this study is to answer the following two questions: how often are evaluat......Evaluation and pre-planning are two critical factors which give the project organization and project manager the opportunity to plan, and avoid unexpected situations in the construction process before it starts. The aim of this study is to answer the following two questions: how often...... are evaluations carried out? And which trade group focus most on evaluations? The study is based on a questionnaire survey for the most common trade groups in the Danish construction industry, where 167 respondents completed the survey. Findings indicate that the architect’s has most focus on evaluation in both...

  12. Gulf of Mexico dissolved oxygen model (GoMDOM) research and quality assurance project plan

    Science.gov (United States)

    An integrated high resolution mathematical modeling framework is being developed that will link hydrodynamic, atmospheric, and water quality models for the northern Gulf of Mexico. This Research and Quality Assurance Project Plan primarily focuses on the deterministic Gulf of Me...

  13. South Bay Salt Pond initial stewardship plan & related Bay Area restoration projects

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Initial Stewardship Plan for the South Bay Salt Pond Restoration Project outlines a process to reduce the salinity of the existing salt ponds and to manage the...

  14. Telescopio San Pedro Mártir Observatory preliminary design and project approach

    Science.gov (United States)

    Teran, Jose; Lee, William H.; Richer, Michael G.; Sánchez, Beatriz S.; Urdaibay, David; Hill, Derek; Adriaanse, David; Hernandez-Limonchi, Regina

    2016-07-01

    The Instituto de Astronomia of the Universidad Nacional Autónoma de México (UNAM) along with Instituto Nacional de Astrofisica, Optica y Electronica, the University of Arizona and the Smithsonian Astrophysical Observatory are developing the Telescopio San Pedro Mártir (TSPM) project, a 6.5m diameter optical telescope. M3 Engineering and Technology Corp. (M3) is the design and construction management firm responsible for all site infrastructure, enclosure and support facilities. The Telescopio San Pedro Mártir project (TSPM) will be located within the San Pedro Mártir National Park in Baja California, Mexico at 2,830 m. above sea level, approximately 65 km. east of the Pacific Ocean, 55km west of the Sea of Cortes (Gulf of California) and 180km south of the United States and México border. The aim of the paper is to present the preliminary design of the site infrastructure, enclosure and support facilities to date and share the design and construction approach.

  15. Ocean thermal energy conversion cold water pipe preliminary design project. Task 2. Analysis for concept selection

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    The successful performance of the CWP is of crucial importance to the overall OTEC system; the pipe itself is considered the most critical part of the entire operation. Because of the importance the CWP, a project for the analysis and design of CWP's was begun in the fall of 1978. The goals of this project were to study a variety of concepts for delivering cold water to an OTEC plant, to analyze and rank these concepts based on their relative cost and risk, and to develop preliminary design for those concepts which seemed most promising. Two representative platforms and sites were chosen: a spar buoy of a Gibbs and Cox design to be moored at a site off Punta Tuna, Puerto Rico, and a barge designed by APL/Johns Hopkins University, grazing about a site approximately 200 miles east of the coast of Brazil. The approach was to concentrate on the most promising concepts and on those which were either of general interest or espoused by others (e.g., steel and concrete concepts). Much of the overall attention, therefore, focused on analyzing rigid and compliant wall design, while stockade (except for the special case of the FRP stockade) and bottom-mounted concepts received less attention. A total of 67 CWP concepts were initially generated and subjected to a screening process. Of these, 16 were carried through design analysis, costing, and ranking. Study results are presented in detail. (WHK)

  16. Distributed Plug-and-Play Planning and Scheduling System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Planning and scheduling (P&S) is an essential task for managing current and future NASA missions. P&S systems are used in many areas of spacecraft operations...

  17. Planning for Planetary Science Mission Including Resource Prospecting Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Advances in computer-aided mission planning can enhance mission operations and science return for surface missions to Mars, the Moon, and beyond. While the...

  18. Southcentral Alaska small hydroelectric projects, reconnaissance phase: Planning aid report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Planning Aid Report is based on information gathered from: (1) Kings River, (2) Tonsina River Tributary, (3) Placer River, (4) Bear Creek, and (5) Windy River....

  19. Huaneng Group Gansu Planned 1 Million Tonnes of Aluminum Project

    Institute of Scientific and Technical Information of China (English)

    2013-01-01

    <正>According to contents in the "Pingliang 100 Billion Grade Coal-power-chemical-smelting Circular Economy Industrial Chain Execution Plan" notice from Gansu Province Industry and Information Technology Commission, China

  20. Science and Technology Roadmapping to Support Project Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mc Carthy, Jeremiah Justin; Haley, Daniel Joseph; Dixon, Brent Wayne

    2001-07-01

    Disciplined science and technology roadmapping provides a framework to coordinate research and development activities with project objectives. This case-history paper describes initial project technology needs identification, assessment and R&D ranking activities supporting characterization of 781 waste tanks requiring a 'hazardous waste determination' or 'verification of empty' decision to meet an Idaho state Voluntary Consent Order.

  1. Using Open Plan with integrated Xbase applications for effective project management solutions

    Energy Technology Data Exchange (ETDEWEB)

    Freier, K.D.; Hirschi, E.J.

    1994-04-01

    Open Plan`s open architecture allows the user many advantages that are not available from other project management software. One of these advantages is its ability to interface with various database management systems, thereby allowing the user to develop a project management system tailored to their specific needs. This open architecture offers maximum flexability to the user to personalize reports, screens, data structures, and develop customized management systems. Using Xbase, applications can be developed for every facet of a complete project management system including baseline development, performance measurement, reporting, and analysis. These applications can range from simple routines such as user-defined status worksheets, milestone logs and other reports, to complex cost,and schedule control systems. The combined power of Xbase and Open Plan can be used to produce effective project management solutions. Customized applications are easily obtainable allowing the user to gather information more timely and efficiently, produce customized reports, and analyze project management information more effectively.

  2. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  3. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

    2007-02-01

    federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

  4. Information Update Research Fellowship for International Young Scientists NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Danish National Research Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects with DFG News in Brief: NSFC set up Department of Medical Sciences NSFC Announced Approved Cooperative Projects With France and Germany NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Academy of Finland NSFC Announced Application Guide for Cooperative Research Projects with K. T. Li Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research projects With Japan Science and Technology Agency NSFC Announced Application Guide for Cooperative Research Projects With Royal Society of Edinburgh for 2010 NSFC Announced a List of proved Cooperative Projects With Three International Organizations

    Science.gov (United States)

    2009-01-01

    Research Fellowship for International Young Scientists NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Danish National Research Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects with DFG News in Brief: NSFC set up Department of Medical Sciences NSFC Announced Approved Cooperative Projects With France and Germany NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research Projects With Academy of Finland NSFC Announced Application Guide for Cooperative Research Projects with K. T. Li Foundation NSFC Announced Results of Preliminary Evaluation of Bilateral Cooperative Research projects With Japan Science and Technology Agency NSFC Announced Application Guide for Cooperative Research Projects With Royal Society of Edinburgh for 2010 NSFC Announced a List of proved Cooperative Projects With Three International Organizations

  5. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  6. How Will Teachers Fare in Rhode Island's New Hybrid Pension Plan? Public Pension Project Brief 4

    Science.gov (United States)

    Johnson, Richard W.; Butrica, Barbara A.; Haaga, Owen; Southgate, Benjamin G.

    2014-01-01

    Hybrid retirement plans that combine defined benefit pensions with 401(k) type, defined contribution accounts can play important roles in the reform of public-sector pensions. Summarizing results from our longer report ["How Will Rhode Island's New Hybrid Pension Plan Affect Teachers? A Report of the Public Pension Project" (2014)], this…

  7. FY 2002 Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

    2001-10-31

    This document is an integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders ("surveillance monitoring"); other, established monitoring plans by reference; and a master well/ constituent/frequency matrix for the entire Hanford Site.

  8. SHENHUA PLANS EIGHT COAL-TO-OIL PROJECTS IN NORTH CHINA

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ China's biggest coal producer, Shenhua Group, plans to convert coal into 30 million tons ofoil by the year 2020 in four northern provinces. Three of eight projects planned will be completed by 2010, Zhang Yuzhuo, in charge of Shenhua's coal liquefaction business, told an energy forum hosted by the China Energy Research Society in Beijing on June 15.

  9. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    Science.gov (United States)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  10. Preliminary results of radiation monitoring near uranium mines in Namibia EJOLT Project (DRAFT version)

    Energy Technology Data Exchange (ETDEWEB)

    Chareyron, Bruno

    2012-04-05

    As a part of the EJOLT (Environmental Justice Organizations Liability and Trade) project, EARTHLIFE Namibia and CRIIRAD (Commission for Independent Research and Information about Radiation) have organised visits in areas located in the vicinity of uranium mines in Namibia In the course of an on site mission carried out between September 22 and October 2 2011, scientists from the CRIIRAD laboratory took radiation measurements in situ, and collected 14 samples of top soil, 13 samples of surface sediments of the Swakop, Gawib and Khan rivers, 11 underground water samples in the alluvium of Swakop, and Khan rivers and tap water from Arandis city, and one sample of asparagus. Solid samples have been analysed at the CRIIRAD laboratory in France (measurements performed by HpGe gamma spectrometry) and water samples have been monitored for main chemicals by LDA 26 laboratory in France and for radium 226 and radon 222 at the CRIIRAD laboratory. Some of the preliminary findings are summarised in this report: 1 - The dose rate measured by CRIIRAD on the parking of Roessing mine is about 6 times above natural background value (0.9 {mu}Sv/h compared to 0.15 {mu}Sv/h); 2 - The management of waste rock dumps needs to be improved: Some waste rocks are dumped on the banks of Khan river (at the intersection with Dome Gorge) without fencing and confinement. The radiological impact of this activity has to be studied in detail but preliminary measurements show various impacts on the environment; 3 - The finest fraction of the radioactive tailings dumped on Roessing tailings dam is blown away by the wind and contaminates the surrounding environment; 4 - The high uranium concentration in underground water collected downstream Roessing uranium mine in the Khan river and Swakop river alluvium raises the question of the origin of this uranium

  11. Spent nuclear fuel project systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Womack, J.C., Westinghouse Hanford

    1996-07-19

    The purpose of this document is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices. The methodology promotes and ensures sound management of the SNF Project. The scope of the document encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project including risk management process, design authority/design agent concept, and documentation responsibilities. This implementation applies to, and is tailored to the needs of the SNF Project and all its Subprojects, including all current and future Subprojects.

  12. SSVD Extreme Temperature Electronics for Planned Venus Missions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The purpose of this project is to demonstrate, based on a new class of electronic devices called solid state vacuum devices (SSVD?s), a highly promising enabling...

  13. Prime Hook NWR Marsh Restoration Project Summary & Monitoring Plan 2015

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This living document provides a condensed explanation of wetland management history and a large-scale tidal marsh restoration project at Prime Hook NWR in Delaware....

  14. SSVD Extreme Temperature Electronics for Planned Venus Missions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The purpose of this project is to demonstrate the feasibility of a new class of electronic devices called solid state vacuum devices (SSVDTMs), a highly enabling...

  15. Denmark's greenhouse gas projections until 2012, an update including a preliminary projection until 2017

    Energy Technology Data Exchange (ETDEWEB)

    Fenham, J. [Risoe National Lab., Roskilde (Denmark)

    2003-07-01

    This report presents the results of a project financed by the Danish Energy Agency. The purpose of the project is to make 'with measures' projections of the emissions from Danish sources of the greenhouse gases, CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6}. The 'with measures' projection encompasses currently implemented and adopted policies and measures. The time period covered is from 1972, the first year detailed Danish energy statistics were produced, until the first commitment period (2008-2012) under the Kyoto Protocol to the Climate Convention. A preliminary projection is also made for the second commitment period (2013-2017), but here no projections are available for the agricultural sector and the emissions from this sector has therefore been kept equal to the emissions in the first commitment period. Estimations of HFCs, PFCs and SF{sub 6}-emissions and projections cover the period from 1993 until 2020. Only emissions caused by human activities are included in the calculations. However, it can sometimes be difficult to draw the borderline between emissions from nature and anthropogenic emissions. Due to small differences between the methodology used in this project and the methodology (CORINAIR) used by the National Environmental Research Institute for the purpose of annual reporting the estimated emissions presented for the period 1990-2000 may deviate from the official emission estimates report to the EU and the Climate Convention (UNFCCC). Therefore the GHG emission estimates presented in this report for the period until 2000 should only be seen as an illustration of the order of magnitude. This is also the case for the parts of the trend analyses, which are based on the historic data coming from this project. The description of the emissions in the report is structured according to the IPCC sectors: 1) Energy. 2) Industrial processes. 3) Agriculture. 4) Land use change and forestry. 5) Waste. The NMVOC emission from

  16. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  17. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  18. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  19. Enabling strategic projects: assessment of key instruments for national spatial planning

    NARCIS (Netherlands)

    Savini, F.; Salet, W.; Majoor, S.

    2010-01-01

    This research focuses on the instruments and tools which national planning agencies have at their disposal to intervene and get involved in strategic projects. The research examines how strategic national visions are translated into interventions in local projects across the Dutch territory. This

  20. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  1. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  2. Wind energy and spatial planning procedures; La programmation spatiale des projects eoliens

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Wind turbines projects have been increasing, but some are very conflicted. May be it is a reason why some local authorities have to deal with different point of view, above the only energy question and including local specificity. To give local authorities the possibility to be implicated and to be in control of wind projects in their territory, wind spatial planning should permit to choose suitable areas and to optimize wind power development. In this context this synthesis presents the wind spatial planning in Finistere (France), the french regulation, some international experiences (Danish, Flemish, Walloon region, Dutch) and the different approaches of spatial planning. (A.L.B.)

  3. Plans and Preliminary Results of Fundamental Studies of Ice Crystal Icing Physics in the NASA Propulsion Systems Laboratory

    Science.gov (United States)

    Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas

    2017-01-01

    This paper describes plans and preliminary results for using the NASA Propulsion Systems Lab (PSL) to experimentally study the fundamental physics of ice-crystal ice accretion. NASA is evaluating whether this facility, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This paper presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.

  4. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  5. Kelly Hot Spring Geothermal Project: Kelly Hot Spring Agricultural Center preliminary design. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Longyear, A.B. (ed.)

    1980-08-01

    A Phase 1 Preliminary Design, Construction Planning and Economic Analysis has been conducted for the Kelly Hot Spring Agricultural Center in Modoc County, California. The core activity is a 1360 breeding sow, swine raising complex that utilizes direct heat energy from the Kelly Hot Spring geothermal resource. The swine is to be a totally confined operation for producing premium pork in controlled-environment facilities. The complex contains a feed mill, swine raising buildings and a complete waste management facility that produces methane gas to be delivered to a utility company for the production of electricity. The complex produces 6.7 million pounds of live pork (29,353 animals) shipped to slaughter per year; 105,000 cu. ft. of scrubbed methane per day; and fertilizer. Total effluent is less than 200 gpm of agricultural quality-water with full odor control. The methane production rate made possible with geothermal direct heat is equivalent to at least 400 kw continuous. Sale of the methane on a co-generation basis is being discussed with the utility company. The use of geothermal direct heat energy in the complex displaces nearly 350,000 gallons of fuel oil per year. Generation of the biogas displaces an additional 300,000 gallons of fuel oil per year.

  6. Metis Hub: The Development of an Intuitive Project Planning System

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, Rachael M. [Oregon State Univ., Corvallis, OR (United States); Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  7. 7 CFR 1209.40 - Programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ..., marketing, and use of mushrooms and mushroom products, and the creation of new products thereof, to the end... PROMOTION, RESEARCH, AND CONSUMER INFORMATION ORDER Mushroom Promotion, Research, and Consumer Information Order Promotion, Research, Consumer Information, and Industry Information § 1209.40 Programs, plans, and...

  8. Development of a biogas planning tool for project owners

    DEFF Research Database (Denmark)

    Fredenslund, Anders Michael; Kjær, Tyge

    A spreadsheet model was developed, which can be used as a tool in the initial phases of planning a centralized biogas plant in Denmark. The model assesses energy production, total plant costs, operational costs and revenues and effect on greenhouse gas emissions. Two energy utilization alternatives...... to provide data for other documents needed such as economic and environmental assessments....

  9. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-02-11

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  10. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    Energy Technology Data Exchange (ETDEWEB)

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  11. Planning with Shared Vision: A Project Study Examining the Planning Process of School Principals

    Science.gov (United States)

    King, Dennis J.

    2013-01-01

    The process of planning for school principals has become more difficult in recent years because of a shift from simple administrative duties to management duties. Evidence suggests that many school principals lack the resources, training, and guidance to meet and sustain federal planning standards. This problem is important to district…

  12. Planning with Shared Vision: A Project Study Examining the Planning Process of School Principals

    Science.gov (United States)

    King, Dennis J.

    2013-01-01

    The process of planning for school principals has become more difficult in recent years because of a shift from simple administrative duties to management duties. Evidence suggests that many school principals lack the resources, training, and guidance to meet and sustain federal planning standards. This problem is important to district…

  13. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    Energy Technology Data Exchange (ETDEWEB)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  14. Planning, starting, and operating an educational incentives project.

    Science.gov (United States)

    Finnigan, O D; Sun, T H

    1972-01-01

    The article presents a summary of activities in an educational savings project in Taiwan. The project rewards couples who limit their family size. The reward is in the form of funds which enable the couples to send their children to secondary schools or universities. According to a 1970 survey in Taiwan the ideal number of children remained at 4. Consistent with traditional Chinese values, Taiwanese expect their children to take care of them in their old-age. They also place a strong emphasis on education and when surveyed 40% cited education costs as a reason for saving money. A rural township, Changua county, was selected for the pilot project. The project offers to couples with 0, 1, or 2 children an annual deposit in a savings account for each year that they do not exceed 2 living children. If a couple has a third child the value of the savings account is reduced by 50%. If they have a fourth child the account is cancelled and all funds are returned to the bank. In this particular study it was decided to include couples who already had 3 children. The account can be closed by a 1 time withdrawal from 10-14 years after enrollment. After 10 years it is worth US $267.50. After 14 years its value is US $384.60. 961 married women less than 30 years old with 3 or fewer children were contacted to join the project. Village leaders and administrators were invited to a meeting to gain their support before registration took place. After mailing and meetings, 727 or 69% of those eligible joined the project. By September 1973 the investigators hoped to be able to measure the effect of the program on family size ideals, number of additional children wanted, and practice of contraception. By September 1975 they hope to begin to measure the program effect on fertility.

  15. Project management for complex ground-based instruments: MEGARA plan

    Science.gov (United States)

    García-Vargas, María. Luisa; Pérez-Calpena, Ana; Gil de Paz, Armando; Gallego, Jesús; Carrasco, Esperanza; Cedazo, Raquel; Iglesias, Jorge

    2014-08-01

    The project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from different administrative departments at the funding centers worldwide distributed. The complexity of the organizations, the technological and scientific return to the Consortium partners and the participation in the project of all kind of professional centers working in astronomical instrumentation: universities, research centers, small and large private companies, workshops and providers, etc. make the project management strategy, and the tools and procedures tuned to the project needs, crucial for success. MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi-Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain). MEGARA is being developed under contract with GRANTECAN.

  16. Multi-Element Integrated Project Planning at Kennedy Space Center

    Science.gov (United States)

    Mullon, Robert

    2008-01-01

    This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

  17. Observation of seismicity based on DOMERAPI and BMKG seismic networks: A preliminary result from DOMERAPI project

    Science.gov (United States)

    Ramdhan, Mohamad; Nugraha, Andri Dian; Widiyantoro, Sri; Kristyawan, Said; Sembiring, Andry Syaly; Mtaxian, Jean-Philippe

    2016-05-01

    DOMERAPI project has involved earth scientists from Indonesia and France to conduct comprehensively a study of the internal structure of Mt. Merapi and its vicinity based on seismic tomographic imaging. The DOMERAPI seismic network was running from October 2013 to April 2015 consisting of 53 broad-band seismometers, covering Mt. Merapi and Mt. Merbabu, and some geological features such as Opak and Dengkeng faults. Earthquake hypocenter determination conducted in this study is an important step before seismic tomographic imaging. The earthquake events were identified and picked manually and carefully. The majority of earthquakes occured outside the DOMERAPI network. The ray paths of seismic waves from these earthquakes passed through the deep part of the study area around Merapi. The joint data of BMKG and DOMERAPI networks can minimize the azimuthal gap, which is often used to obtain an indication of the reliability of the epicentral solution. Our preliminary results show 279 events from October 2013 to mid August 2014. For future work, we will incorporate the BPPTKG (Center for Research and Technology Development of Geological Disaster) data catalogue in order to enrich seismic ray paths. The combined data catalogues will provide information as input for further advanced studies and volcano hazards mitigation.

  18. Operationally efficient propulsion system study (OEPSS) data book. Volume 9; Preliminary Development Plan for an Integrated Booster Propulsion Module (BPM)

    Science.gov (United States)

    DiBlasi, Angelo G.

    1992-01-01

    A preliminary development plan for an integrated propulsion module (IPM) is described. The IPM, similar to the Space Transportation Main engine (STME) engine, is applicable to the Advanced Launch System (ALS) baseline vehicle. The same STME development program ground rules and time schedule were assumed for the IPM. However, the unique advantages of testing an integrated engine element, in terms of reduced number of hardware and number of system and reliability tests, compared to single standalone engine and MPTA, are highlighted. The potential ability of the IPM to meet the ALS program goals for robustness, operability and reliability is emphasized.

  19. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    Energy Technology Data Exchange (ETDEWEB)

    Liekhus, K.; Grandy, J.; Chambers, A. [and others

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools.

  20. Planning the Human Variome Project : The Spain Report

    NARCIS (Netherlands)

    Kaput, Jim; Cotton, Richard G. H.; Hardman, Lauren; Watson, Michael; Al Aqeel, Aida I.; Al-Aama, Jumana Y.; Al-Mulla, Fahd; Alonso, Santos; Aretz, Stefan; Auerbach, Arleen D.; Bapat, Bharati; Bernstein, Inge T.; Bhak, Jong; Bleoo, Stacey L.; Bloecker, Helmut; Brenner, Steven E.; Burn, John; Bustamante, Mariona; Calone, Rita; Cambon-Thomsen, Anne; Cargill, Michele; Carrera, Paola; Cavedon, Lawrence; Cho, Yoon Shin; Chung, Yeun-Jun; Claustres, Mireille; Cutting, Garry; Dalgleish, Raymond; den Dunnen, Johan T.; Diaz, Carlos; Dobrowolski, Steven; dos Santos, M. Rosario N.; Ekong, Rosemary; Flanagan, Simon B.; Flicek, Paul; Furukawa, Yoichi; Genuardi, Maurizio; Ghang, Ho; Golubenko, Maria V.; Greenblatt, Marc S.; Hamosh, Ada; Hancock, John M.; Hardison, Ross; Harrison, Terence M.; Hoffmann, Robert; Horaitis, Rania; Howard, Heather J.; Barash, Carol Isaacson; Izagirre, Neskuts; Jung, Jongsun; Kojima, Toshio; Laradi, Sandrine; Lee, Yeon-Su; Lee, Jong-Young; Gil-da-Silva-Lopes, Vera L.; Macrae, Finlay A.; Maglott, Donna; Marafie, Makia J.; Marsh, Steven G. E.; Matsubara, Yoichi; Messiaen, Ludwine M.; Moeslein, Gabriela; Netea, Mihai G.; Norton, Melissa L.; Oefner, Peter J.; Oetting, William S.; O'Leary, James C.; Oller de Ramirez, Ana Maria; Paalman, Mark H.; Parboosingh, Jillian; Patrinos, George P.; Perozzi, Giuditta; Phillips, Ian R.; Povey, Sue; Prasad, Suyash; Qi, Ming; Quin, David J.; Ramesar, Rajkumar S.; Richards, C. Sue; Savige, Judith; Scheible, Dagmar G.; Scott, Rodney J.; Seminara, Daniela; Shephard, Elizabeth A.; Sijmons, Rolf H.; Smith, Timothy D.; Sobrido, Maria-Jesus; Tanaka, Toshihiro; Tavtigian, Sean V.; Taylor, Graham R.; Teague, Jon; Toepel, Thoralf; Ullman-Cullere, Mollie; Utsunomiya, Joji; van Kranen, Henk J.; Vihinen, Mauno; Webb, Elizabeth; Weber, Thomas K.; Yeager, Meredith; Yeom, Young I.; Yim, Seon-Hee; Yoo, Hyang-Sook

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of data

  1. Planning the human variome project: the Spain report.

    NARCIS (Netherlands)

    Kaput, J.; Cotton, R.G.; Hardman, L.; Watson, M.; Aqeel, A.I. Al; Al-Aama, J.Y.; Al-Mulla, F.; Alonso, S.; Aretz, S.; Auerbach, A.D.; Bapat, B.; Bernstein, I.T.; Bhak, J.; Bleoo, S.L.; Blocker, H.; Brenner, S.E.; Burn, J.; Bustamante, M.; Calzone, R.; Cambon-Thomsen, A.; Cargill, M.; Carrera, P.; Cavedon, L.; Cho, Y.S.; Chung, Y.J.; Claustres, M.; Cutting, G.; Dalgleish, R.; Dunnen, J.T. den; Diaz, C.; Dobrowolski, S.; Santos, M.R. dos; Ekong, R.; Flanagan, S.B.; Flicek, P.; Furukawa, Y.; Genuardi, M.; Ghang, H.; Golubenko, M.V.; Greenblatt, M.S.; Hamosh, A.; Hancock, J.M.; Hardison, R.; Harrison, T.M.; Hoffmann, R.; Horaitis, R.; Howard, H.J.; Barash, C.I.; Izagirre, N.; Jung, J.; Kojima, T.; Laradi, S.; Lee, Y.S.; Lee, J.Y.; Gil-da-Silva-Lopes, V.L.; Macrae, F.A.; Maglott, D.; Marafie, M.J.; Marsh, S.G.; Matsubara, Y.; Messiaen, L.M.; Moslein, G.; Netea, M.G.; Norton, M.L.; Oefner, P.J.; Oetting, W.S.; O'Leary, J.C.; Ramirez, A.M. de; Paalman, M.H.; Parboosingh, J.; Patrinos, G.P.; Perozzi, G.; Phillips, I.R.; Povey, S.; Prasad, S.; Qi, M.; Quin, D.J.; Ramesar, R.S.; Richards, C.S.; Savige, J.; Scheible, D.G.; Scott, R.J.; Seminara, D.; Shephard, E.A.; Sijmons, R.H.; Smith, T.D.; Sobrido, M.J.; Tanaka, T.; Tavtigian, S.V.; Taylor, G.R.; Teague, J.; Topel, T.; Ullman-Cullere, M.; Utsunomiya, J.; Kranen, H.J. van; Vihinen, M.; Webb, E.; Weber, T.K.; Yeager, M.

    2009-01-01

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of data

  2. Planning the human variome project: the Spain report.

    NARCIS (Netherlands)

    Kaput, J.; Cotton, R.G.; Hardman, L.; Watson, M.; Aqeel, A.I. Al; Al-Aama, J.Y.; Al-Mulla, F.; Alonso, S.; Aretz, S.; Auerbach, A.D.; Bapat, B.; Bernstein, I.T.; Bhak, J.; Bleoo, S.L.; Blocker, H.; Brenner, S.E.; Burn, J.; Bustamante, M.; Calzone, R.; Cambon-Thomsen, A.; Cargill, M.; Carrera, P.; Cavedon, L.; Cho, Y.S.; Chung, Y.J.; Claustres, M.; Cutting, G.; Dalgleish, R.; Dunnen, J.T. den; Diaz, C.; Dobrowolski, S.; Santos, M.R. dos; Ekong, R.; Flanagan, S.B.; Flicek, P.; Furukawa, Y.; Genuardi, M.; Ghang, H.; Golubenko, M.V.; Greenblatt, M.S.; Hamosh, A.; Hancock, J.M.; Hardison, R.; Harrison, T.M.; Hoffmann, R.; Horaitis, R.; Howard, H.J.; Barash, C.I.; Izagirre, N.; Jung, J.; Kojima, T.; Laradi, S.; Lee, Y.S.; Lee, J.Y.; Gil-da-Silva-Lopes, V.L.; Macrae, F.A.; Maglott, D.; Marafie, M.J.; Marsh, S.G.; Matsubara, Y.; Messiaen, L.M.; Moslein, G.; Netea, M.G.; Norton, M.L.; Oefner, P.J.; Oetting, W.S.; O'Leary, J.C.; Ramirez, A.M. de; Paalman, M.H.; Parboosingh, J.; Patrinos, G.P.; Perozzi, G.; Phillips, I.R.; Povey, S.; Prasad, S.; Qi, M.; Quin, D.J.; Ramesar, R.S.; Richards, C.S.; Savige, J.; Scheible, D.G.; Scott, R.J.; Seminara, D.; Shephard, E.A.; Sijmons, R.H.; Smith, T.D.; Sobrido, M.J.; Tanaka, T.; Tavtigian, S.V.; Taylor, G.R.; Teague, J.; Topel, T.; Ullman-Cullere, M.; Utsunomiya, J.; Kranen, H.J. van; Vihinen, M.; Webb, E.; Weber, T.K.; Yeager, M.

    2009-01-01

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of data f

  3. Planning the Human Variome Project : The Spain Report

    NARCIS (Netherlands)

    Kaput, Jim; Cotton, Richard G. H.; Hardman, Lauren; Watson, Michael; Al Aqeel, Aida I.; Al-Aama, Jumana Y.; Al-Mulla, Fahd; Alonso, Santos; Aretz, Stefan; Auerbach, Arleen D.; Bapat, Bharati; Bernstein, Inge T.; Bhak, Jong; Bleoo, Stacey L.; Bloecker, Helmut; Brenner, Steven E.; Burn, John; Bustamante, Mariona; Calone, Rita; Cambon-Thomsen, Anne; Cargill, Michele; Carrera, Paola; Cavedon, Lawrence; Cho, Yoon Shin; Chung, Yeun-Jun; Claustres, Mireille; Cutting, Garry; Dalgleish, Raymond; den Dunnen, Johan T.; Diaz, Carlos; Dobrowolski, Steven; dos Santos, M. Rosario N.; Ekong, Rosemary; Flanagan, Simon B.; Flicek, Paul; Furukawa, Yoichi; Genuardi, Maurizio; Ghang, Ho; Golubenko, Maria V.; Greenblatt, Marc S.; Hamosh, Ada; Hancock, John M.; Hardison, Ross; Harrison, Terence M.; Hoffmann, Robert; Horaitis, Rania; Howard, Heather J.; Barash, Carol Isaacson; Izagirre, Neskuts; Jung, Jongsun; Kojima, Toshio; Laradi, Sandrine; Lee, Yeon-Su; Lee, Jong-Young; Gil-da-Silva-Lopes, Vera L.; Macrae, Finlay A.; Maglott, Donna; Marafie, Makia J.; Marsh, Steven G. E.; Matsubara, Yoichi; Messiaen, Ludwine M.; Moeslein, Gabriela; Netea, Mihai G.; Norton, Melissa L.; Oefner, Peter J.; Oetting, William S.; O'Leary, James C.; Oller de Ramirez, Ana Maria; Paalman, Mark H.; Parboosingh, Jillian; Patrinos, George P.; Perozzi, Giuditta; Phillips, Ian R.; Povey, Sue; Prasad, Suyash; Qi, Ming; Quin, David J.; Ramesar, Rajkumar S.; Richards, C. Sue; Savige, Judith; Scheible, Dagmar G.; Scott, Rodney J.; Seminara, Daniela; Shephard, Elizabeth A.; Sijmons, Rolf H.; Smith, Timothy D.; Sobrido, Maria-Jesus; Tanaka, Toshihiro; Tavtigian, Sean V.; Taylor, Graham R.; Teague, Jon; Toepel, Thoralf; Ullman-Cullere, Mollie; Utsunomiya, Joji; van Kranen, Henk J.; Vihinen, Mauno; Webb, Elizabeth; Weber, Thomas K.; Yeager, Meredith; Yeom, Young I.; Yim, Seon-Hee; Yoo, Hyang-Sook

    2009-01-01

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of data f

  4. West Valley Demonstration Project: Public information plan: Objectives, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, W. D.

    1987-09-30

    This report describes the objectives and proposed activities of the public information program. Included are statements of purpose, goals, approach, and methods of implementation. This office deals with local, state, and federal agencies to inform them on the status of this demonstration project. (TEM)

  5. Alaska Native Community Energy Planning and Projects (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-06-01

    This fact sheet provides information on the Alaska Native villages selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  6. Planning the Human Variome Project : The Spain Report

    NARCIS (Netherlands)

    Kaput, Jim; Cotton, Richard G. H.; Hardman, Lauren; Watson, Michael; Al Aqeel, Aida I.; Al-Aama, Jumana Y.; Al-Mulla, Fahd; Alonso, Santos; Aretz, Stefan; Auerbach, Arleen D.; Bapat, Bharati; Bernstein, Inge T.; Bhak, Jong; Bleoo, Stacey L.; Bloecker, Helmut; Brenner, Steven E.; Burn, John; Bustamante, Mariona; Calone, Rita; Cambon-Thomsen, Anne; Cargill, Michele; Carrera, Paola; Cavedon, Lawrence; Cho, Yoon Shin; Chung, Yeun-Jun; Claustres, Mireille; Cutting, Garry; Dalgleish, Raymond; den Dunnen, Johan T.; Diaz, Carlos; Dobrowolski, Steven; dos Santos, M. Rosario N.; Ekong, Rosemary; Flanagan, Simon B.; Flicek, Paul; Furukawa, Yoichi; Genuardi, Maurizio; Ghang, Ho; Golubenko, Maria V.; Greenblatt, Marc S.; Hamosh, Ada; Hancock, John M.; Hardison, Ross; Harrison, Terence M.; Hoffmann, Robert; Horaitis, Rania; Howard, Heather J.; Barash, Carol Isaacson; Izagirre, Neskuts; Jung, Jongsun; Kojima, Toshio; Laradi, Sandrine; Lee, Yeon-Su; Lee, Jong-Young; Gil-da-Silva-Lopes, Vera L.; Macrae, Finlay A.; Maglott, Donna; Marafie, Makia J.; Marsh, Steven G. E.; Matsubara, Yoichi; Messiaen, Ludwine M.; Moeslein, Gabriela; Netea, Mihai G.; Norton, Melissa L.; Oefner, Peter J.; Oetting, William S.; O'Leary, James C.; Oller de Ramirez, Ana Maria; Paalman, Mark H.; Parboosingh, Jillian; Patrinos, George P.; Perozzi, Giuditta; Phillips, Ian R.; Povey, Sue; Prasad, Suyash; Qi, Ming; Quin, David J.; Ramesar, Rajkumar S.; Richards, C. Sue; Savige, Judith; Scheible, Dagmar G.; Scott, Rodney J.; Seminara, Daniela; Shephard, Elizabeth A.; Sijmons, Rolf H.; Smith, Timothy D.; Sobrido, Maria-Jesus; Tanaka, Toshihiro; Tavtigian, Sean V.; Taylor, Graham R.; Teague, Jon; Toepel, Thoralf; Ullman-Cullere, Mollie; Utsunomiya, Joji; van Kranen, Henk J.; Vihinen, Mauno; Webb, Elizabeth; Weber, Thomas K.; Yeager, Meredith; Yeom, Young I.; Yim, Seon-Hee; Yoo, Hyang-Sook

    2009-01-01

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of data f

  7. The CHOICES Project: Piloting a Secondary Transition Planning Database

    Science.gov (United States)

    Campbell, Dennis; Baxter, Abigail; Ellis, David; Pardue, Harold

    2013-01-01

    The CHOICES Project funded by the Institute of Education Sciences (IES), U.S. Department of Education, addresses the need for ready access to information for parents, students, school, and community agency personnel regarding transitional and community support programs. At this time we have created two databases (student information and community…

  8. Genetic algorithms for construction site layout in project planning

    NARCIS (Netherlands)

    Mawdesley, Michael J.; Al-Jibouri, Saad H.S.; Yang, Hongbo

    2002-01-01

    Construction site layout is concerned with the existence, positioning, and timing of the temporary facilities that are used to carry out a construction project. Typically these problems are very complicated to formulate and difficult to solve. They are, however, very important to virtually any

  9. Planning the human variome project: the Spain report

    DEFF Research Database (Denmark)

    Kaput, Jim; Cotton, Richard G H; Hardman, Lauren

    2009-01-01

    The remarkable progress in characterizing the human genome sequence, exemplified by the Human Genome Project and the HapMap Consortium, has led to the perception that knowledge and the tools (e.g., microarrays) are sufficient for many if not most biomedical research efforts. A large amount of dat...

  10. Impact of Rand devaluation on existing and planned REIPPPP Projects

    CSIR Research Space (South Africa)

    Milazi, DBK

    2016-06-01

    Full Text Available to in structuring finance for utility scale renewable energy projects. Financial risks are related to the stability of future cash flows available to service debt as a result of capital intensiveness of the investment. The most common among these is interest rate...

  11. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  12. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  13. Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Danny Anderson

    2014-07-01

    As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INL’s contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposal vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE

  14. Business Plan Project A Step-by-Step Guide to Writing a Business Plan

    CERN Document Server

    Sellars, David

    2010-01-01

    This book is designed to meet important needs of each segment; (1) the business plan serves as a means for college students to learn about the major functions of business and how they are interrelated, (2) entrepreneurs need a business plan to provide direction in the organization and launch of a new business and secure initial capital from funding sources, (3) consultants need a user-friendly business plan format to assist clients that have limited or no business experience, and (4) instructors and trainers need a turn-key text with supplements that require no lecture and little prep-time to

  15. Status report, The Public Health and Planning 101 project: strengthening collaborations between the public health and planning professions.

    Science.gov (United States)

    Mahendra, A; Vo, T; Einstoss, C; Weppler, J; Gillen, P; Ryan, L; Haley, K

    2017-01-01

    Land use planning is a complex field comprised of legislation, policies, processes and tools. A growing body of evidence supports the relationship between land use planning decisions, community design and health. The built environment has been shown to be associated with physical inactivity, obesity, cardiovascular disease, respiratory disease and mental illness. Consequently, there is a growing interest within public health to work with planners on land use planning initiatives such as official plans and transportation master plans. Two surveys were developed: one for public health professionals and the other for planning professionals (survey questions available upon request to the corresponding author). The surveys were pilot tested in two separate focus group sessions with public health and planning professionals. Focus group volunteers helped to validate the surveys by verifying survey questions, design and overall flow. In early 2012, 304 public health professionals and 301 planning professionals completed the two separate surveys, comprising the total survey respondents for each respective profession used to calculate proportions. The survey results represent a convenience sample and are not generalizable to the entire population of public health and planning professionals in Ontario. Results compare survey responses from both groups where appropriate. Most respondents worked either as public health staff (78%) or planners/senior planners (58%). A smaller percentage of public health and planning professionals worked either as managers (15% and 11%, respectively) or directors (5% and 9%, respectively). Health is associated with how communities are planned and built, and the services and resources provided within them. Inspired by the results of our survey and based on user feedback from the pilot tests, a free online training program entitled "Public Health and Planning 101: An Online Course for Public Health and Planning Professionals to Create Healthier

  16. S/sup 3/ Financial Projection Model: preliminary user's manual and system overview

    Energy Technology Data Exchange (ETDEWEB)

    Masso, J. F.

    1976-11-30

    The S/sup 3/ Financial Projection Model is an effort undertaken to construct a pipeline economic model in order to satisfy the requirements of the US ERDA program: Energy Study of Pipeline Transportation System. A brief outline of this process is described in Appendix A, Background on the S/sup 3/ Development of a Pipeline Economic Model. A general overview of the model is presented first to indicate the rationale underlying the model and to show the linkages between the various submodels. An understanding of the basic accounting definitions and self-evident relationships between line items in the general financial accounting reports is a prerequisite for the effective application of the model. Particular attention has been paid in this system description to defining the methods of calculations utilized by the model and to describing the optional capital investment planning techniques that may be exercised with the model. The mathematical relationships underlying various planning techniques are defined and the methods for applying these techniques are discussed with illustrations and sample input data specifications. Decision tables are used to show complex decision rules applied within the model to determine the logical flow of a particular computational routine. The complete set of source data and model options are described along with the procedures for input data preparation and actual program operation.

  17. Preliminary development plan of the ALR, the laser rangefinder for the ASTER deep space mission to the 2001 SN263 asteroid

    Directory of Open Access Journals (Sweden)

    Antonio Gil Vicente de Brum

    2011-09-01

    Full Text Available The Brazilian deep space mission ASTER, as temporarily named, plans to send a small spacecraft to encounter and investigate the triple asteroid 2001-SN263. The launch is scheduled (initially to occur in 2015, arriving in 2018. The main motivation of the mission is the development of technology and expertise to leverage the national space sector. Within the scientific goals, the investigation of the still unknown asteroid 2001-SN263. The main project guideline is to aggregate the widest possible Brazilian involvement in the platform, the development and operation of subsystems, integration, payload, as well as in the tracking, navigation, guidance and control of the probe. To meet this guideline, among others, the decision for the development of a laser altimeter in Brazil to fly in the mission was taken. This effort is currently coordinated by a group of researchers from the aerospace engineering personnel of UFABC. This article presents the preliminary development plan for the design of this instrument, which was called ALR (ASTER Laser Rangefinder.

  18. Achieving Smart Energy Planning Objectives. The Approach of the Transform Project

    Directory of Open Access Journals (Sweden)

    Ilaria Delponte

    2014-05-01

    Full Text Available Cities play a dual role in the field of energy and integrated planning. They function as institutional planning and decision making bodies and interfere as actors, e.g. as project developers or launching customers. In the first case their attempts at integrated plans are often unsuccessful in integrating vision, goals and instruments of all stakeholders so that waste, water, energy cycles, urban planning and budgets proceed with no connection to each other.  TRANSFORM Project “Transformation Agenda for Low Carbon Cities” (FP7 tries to improve the integrated energy policy and decision making process of cities, both at a strategic and operational level, by providing the cities with a framework based on overall planning experiences and on-the-field projects and qualitative and quantitative analysis support models. The project intends also to make a step further in the quality of research, by providing a replicable and tested framework for the production of a strategic Transformation Agenda for the city as a whole, combined with district Implementation Plans.

  19. The Volubilis project, Morocco: excavation, conservation and management planning

    Directory of Open Access Journals (Sweden)

    Elizabeth Fentress

    2001-10-01

    Full Text Available Volubilis in northern Morocco is famous for the impressive remains of its Roman city, but it was also an important early Islamic town and is listed by UNESCO as a World Heritage site. Teams from Morocco and the Institute of Archaeology recently began a joint project there, focused on the investigation of the Islamic occupation and the conservation and presentation of the site to the public.

  20. Sustainable transport project evaluation and decision support: indicators and planning criteria for sustainable development

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Pryn, Marie Ridley

    2015-01-01

    risk analysis as well as sustainable planning criteria in the assessment of the project uncovering new solutions. Thereof the decision support model reveals large potential for the inclusion of planning criteria if the overall objective of development toward a sustainable transportation system...... definitions of the criteria planned for, in order to achieve a sustainable transport system. This alternative approach proves that with relatively small changes in objectives, sustainable development within transport planning can be reached.......This article will expose the necessity for a sustainable planning and decision support framework for transport infrastructure assessment. This will be operationalized through a set of planning criteria and scenario alternatives, which is assessed in the SUSTAIN decision support system (SUSTAIN...

  1. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    MERCADO, L.C.

    2000-04-22

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

  2. Projectizing the development and/or maintenance process for emergency response/contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    A. A. Francis

    2000-07-01

    The attainment of established goals and objects is essential and paramount for all successful projects in business and industry, including the development and/or maintenance of emergency response/contingency plans. The need for effective project management is an ongoing effort. As with any aspect of business, better ways of managing projects have been and are being developed. Those organizations that take the lead in implementing these capabilities consistently perform their projects better, and in the case of emergency management, provide better protection to employees, property, and the environment.

  3. Radiation dose reduction in CT fluoroscopy-guided lumbar interlaminar epidural steroid injection by minimizing preliminary planning imaging

    Energy Technology Data Exchange (ETDEWEB)

    Paik, Nam Chull [Arumdaun Wooldul Spine Hospital, Department of Radiology, Ulsan (Korea, Republic of)

    2014-09-15

    To test whether radiation dose reduction in CTF-guided LIESI would be achieved by replacing the preliminary planning CT with a spot CTF while still maintaining technical performance. This retrospective study included a review of 247 consecutive procedures performed on 241 patients before (comparison group: n = 124) and after (study group: n = 123) instituting the above-mentioned the protocol modification. The patient (age, sex, body diameter, and level injected) and performance (procedure time, number of CTF acquisitions, and DLP) characteristics were compared between the two groups. The total DLP of the study group (median 4.94 mGy . cm) was significantly reduced compared to that of the comparison group (median 31.78 mGy . cm, P < 0.001). The numbers of CTF acquisitions needed for needle placement and epidurography were very similar for both groups (median 3, P = 0.685). The mean procedure time was significantly shorter for the study group (5:14 ± 1:06 min) compared to the comparison group (5:53 ± 1:19 min, P < 0.001). When conducting CTF-guided LIESIs, a significant radiation dose reduction (median 84.5 % in DLP, P < 0.001) can be achieved by minimizing the preliminary planning examination, without compromising the number of CTF acquisitions and the procedure time. (orig.)

  4. Radiation Testing on State-of-the-Art CMOS: Challenges, Plans, and Preliminary Results

    Science.gov (United States)

    LaBel, Kenneth A.; Cohn, Lewis M.

    2009-01-01

    At GOMAC 2007 and 2008, we discussed a variety of challenges for radiation testing of modern semiconductor devices and technologies [1, 2]. In this presentation, we provide more specific details in this on-going investigation focusing on out-of-the-box lessons observed for providing radiation effects assurances as well as preliminary test results.

  5. UMTRA project water sampling and analysis plan, Durango, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  6. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  7. The development of a quality assurance project plan for the USEPA dioxin exposure initiative program

    Energy Technology Data Exchange (ETDEWEB)

    Byrne, C.; Ferrario, J. [Stennis Space Center, MS (USA). USEPA Environmental Chemistry Laboratory

    2004-09-15

    All projects planned and implemented under the United States Environmental Protection Agency (USEPA) Dioxin Exposure Initiative are required to have completed Quality Assurance Projects Plans (QAPPs). EPA Order 5360.1 A2 states, ''All work funded by the United States Environmental Protection Agency (EPA) that involves the acquisition of environmental data generated from direct measurement activities, collected from other sources, or compiled from computerized data bases and information systems are implemented in accordance with an approved QA Project Plan except under circumstances requiring immediate actions to protect human health and the environment or operations conducted under police powers''. This policy is based on the newly revised national consensus standard, ANSI/ASQC E-4-2004. These QAPPs have proven invaluable in the development and improvement of analytical methodology for dioxin-like compounds over the intervening years and in the verification and validation of the results of dioxin exposure studies.

  8. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  9. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  10. Community-Level Environmental Projects as Learning Tools for Planners: A Case Study of Graduate Planning Students

    Science.gov (United States)

    Portman, Michelle E.; Teff-Seker, Yael

    2017-01-01

    Despite the potential environmental impact of urban planning, there is little research on Environmental Education (EE) in the context of urban planning curricula. This study follows graduate planning students' learning experience during group projects assigned as part of a planning course at the Technion--Israel Institute of Technology. These…

  11. Community-Level Environmental Projects as Learning Tools for Planners: A Case Study of Graduate Planning Students

    Science.gov (United States)

    Portman, Michelle E.; Teff-Seker, Yael

    2017-01-01

    Despite the potential environmental impact of urban planning, there is little research on Environmental Education (EE) in the context of urban planning curricula. This study follows graduate planning students' learning experience during group projects assigned as part of a planning course at the Technion--Israel Institute of Technology. These…

  12. Project Planning and Management for First Year Engineering Students

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; S. Stachowicz, Marian

    2014-01-01

    of this educational paradigm are:1) Theme of semester; 2) Continuous group work during the semester; 3) Students manage their own educational processes; 4) The teacher and group members as resources. Russian educational system has restrictions to use PBL. Some of them are: 1) “Vertical” structure of learning plans...... evaluating students it is supposed that they have received an identical set of knowledge and skills listed at federal education standards – and this set is evaluated. The individual educational trajectory of the student practically is not considered. The best way of adapting PBL within Russian educational...... the annex to the main diploma. The experiment was started in Saratov State University in September 2013 with 3rd year students of additional educational program «Web designer». The experimental results will be used in developing bachelors programs using PBL....

  13. Topological complexity of motion planning in projective product spaces

    CERN Document Server

    Gonzalez, Jesus; Torres-Giese, Enrique; Xicotencatl, Miguel

    2012-01-01

    We study Farber's topological complexity (TC) of Davis' projective product spaces (PPS's). We show that, in many non-trivial instances, the TC of PPS's coming from at least two sphere factors is (much) lower than the dimension of the manifold. This is in high contrast with the known situation for (usual) real projective spaces for which, in fact, the Euclidean immersion dimension and TC are two facets of the same problem. Low TC-values have been observed for infinite families of non-simply connected spaces only for H-spaces, for finite complexes whose fundamental group has cohomological dimension not exceeding 2, and now in this work for infinite families of PPS's. We discuss general bounds for the TC (and the Lusternik-Schnirelmann category) of PPS's, and compute these invariants for specific families of such manifolds. Some of our methods involve the use of an equivariant version of TC. We also give a characterization of the Euclidean immersion dimension of PPS's through generalized concepts of axial maps a...

  14. Light Water Reactor Sustainability Program: Digital Architecture Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    There are many technologies available to the nuclear power industry to improve efficiency in plant work activities. These range from new control room technologies to those for mobile field workers. They can make a positive impact on a wide range of performance objectives – increase in productivity, human error reduction, validation of results, accurate transfer of data, and elimination of repetitive tasks. It is expected that the industry will more and more turn to these technologies to achieve these operational efficiencies to lower costs. At the same time, this will help utilities manage a looming staffing problem as the inevitable retirement wave of the more seasoned workers affects both staffing levels and knowledge retention. A barrier to this wide-scale implementation of new technologies for operational efficiency is the lack of a comprehensive digital architecture that can support the real-time information exchanges needed to achieve the desired operational efficiencies. This project will define an advanced digital architecture that will accommodate the entire range of system, process, and plant worker activity to enable the highest degree of integration, thereby creating maximum efficiency and productivity. This pilot project will consider a range of open standards that are suitable for the various data and communication requirements of a seamless digital environment. It will map these standards into an overall architecture to support the II&C developments of this research program.

  15. Next Generation UAV Based Spectral Systems for Environmental Monitoring: project developments, preliminary outcome and findings

    Science.gov (United States)

    Campbell, P. K. E.; Townsend, P. A.; Mandl, D.; Ly, V. T.; Kingdon, C.; Sohlberg, R. A.; Corp, L. A.; Ong, L.; Nagol, J. R.

    2015-12-01

    This investigation contributes for bridging the gap in Earth observation between field and airborne measurements. We will reduce the risk of operating science grade instruments from Unmanned Aerial Systems (UAS), by developing robust methods to make well-characterized spectral measurements for integration, calibration and validation with NASAs science quality satellite and airborne data. Because of the potential for rapid deployment, spatially explicit data from UASs can be acquired irrespective of many of the cost, scheduling and logistic limitations to satellite or piloted aircraft missions. Provided that the measurements are suitably calibrated and well characterized, this opens up opportunities for calibration/validation activities not currently available. There is considerable interest in UASs from the agricultural and forestry industries but there is a need to identify a workflow that yields calibrated comparisons through space and time. The goal of our effort is to ensure that optical high spectral resolution measurements from UAV's are collected and processed in a fashion that allows ready integration with or comparison to NASA satellite and airborne data and derived products. We target the consistent retrieval of calibrated surface reflectance, as well as biological parameters including nutrient and chlorophyll content, chlorophyll fluorescence and photosynthetic capacity. We will test our technology and protocols first using spatially-resolved discrete point measurements characterizing canopy VNIR reflectance and solar-induced fluorescence, followed by imaging spectroscopy. A Rapid Data Assimilation and delivery system will be developed, based on SensorWeb Intelligent Payload Module for high speed onboard processing. The deployment of UAS sensors at sites such as flux towers will facilitate measrurement validation and parameter retrieval, than is possible by foot, from sensors fixed to a tower, or irregular aircraft missions. We will report preliminary

  16. Electronic health record project initiation and early planning in a community health center.

    Science.gov (United States)

    Cortelyou-Ward, Kendall; Noblin, Alice; Martin, Jeremy

    2011-01-01

    Community health centers exist to help their constituents become proactive in addressing their own health care needs and to improve the overall well-being of the community. However, they pose a different set of challenges when implementing an electronic health record system. This article applies 2 project management principles, initiation and early planning, to the electronic health record implementation in a community health center. Issues such as planning, financial considerations, and quality improvement are discussed.

  17. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    Energy Technology Data Exchange (ETDEWEB)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.; Lombardo, Nicholas J.; Bass, Robert B.; Smith, Jason E.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

  18. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  19. Preliminary study of waterfowl habitat development potentials as related to inundated waterfowl habitat by the proposed Rampart Canyon Dam Project, Alaska

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report is a preliminary study of waterfowl habitat development potentials as related to inundated waterfowl habitat by the proposed Rampart Canyon dam project...

  20. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  1. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  2. Focus on the Future of Vocational Education & Training: Scenario Planning Project. An ANTA National Project.

    Science.gov (United States)

    Johnston, Ron

    The future of vocational education and training (VET) in Australia was explored in a project that was designed to identify emerging issues in VET, identify challenges and opportunities for strategic thinking about the future of VET, and establish a basis for ongoing consideration of strategic issues. The major project activities were as follows:…

  3. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  4. Projections in the national mining development plan (NMDP using @risk

    Directory of Open Access Journals (Sweden)

    Giovanni Franco-Sepúlveda

    2014-01-01

    Full Text Available La industria de la minería en Colombia ha alcanzado una importa nte posición en el mercado internacional y en la economía nacio nal; por esto, con el fin de describir la dinámica del mercado minero, analiza r la estructura de la industria y hacer una comparación con las estimaciones de producción de minerales dadas a conocer en el Plan Nacional de Desarrollo Minero (PNDM de la Unidad de Planeación Minero-Ener gética (UPME, se implementará la herramienta @Risk. Esta herramienta y la metodología que se define en el presente artículo, permite incluir la incertidumbre y el riesgo en las estimaciones, en una simulació n que genera una proyección con un horizonte temporal al año 20 19 de la extracción histórica (teniendo en cuenta la extracción entre lo s años 1970 al 2013 de carbón, oro y calizas, construyendo mod elos alternativos que pueden replicarse por la institucionalidad minera en los fu turos PNDM y en sus respectivas actualizaciones.

  5. Family planning through child health: a case study of El Kef project in Tunisia.

    Science.gov (United States)

    Bouzidi, M; Jones, M

    1985-01-01

    In 1970, a Dutch medical team began work in the city of El Kef in Tunisia on a project designed to bring family planning into rural areas. The project aimed to persuade the rural people to use urban health centers, but this approach failed partly because of the remoteness of the communities and their reluctance to discuss personal matters with strangers. Funded by UNFPA, a new project began to recruit and train local girls as home health visitors or aides-familiales, an approach which became the central focus of the El Kef project. The International Planned Parenthood Federation (IPPF) took over the project and expanded it to include nutrition, health care, health education, family planning, disease prevention and domestic crafts. 4 goals were fixed for the project: total vaccination coverage for children; elimination of severe malnutrition; reduction of infant mortality; and use of family planning practice by at least 1/2 the women of childbearing age. An efficient recordkeeping system enabled the project to be carefully evaluated and provides much-needed data, showing where it has achieved its aims and where new efforts should be directed. The project resulted in large numbers of women receiving ante-natal advice, child care and family planning from their local health centers. 860 pregnant women were followed up during the 3-year study period. Some 57% of pregnant women went for advice; only 15% went for postnatal care, but 50% of the women under 50 attended child welfare sessions during the study period for weight checks, nutrition advice, vaccination and treatment for minor ailments. Over the 3 years, the number of contraceptive users more than trebled, from 14% to 54%. The IUD was the most popular method. The most successful aspect of the project was the emphasis on maternal and child health, and the home visits were the most motivating feature. Vaccination became more popular. A further aspect of the project was the training in home improvement skills, like

  6. The Moon Zoo citizen science project: Preliminary results for the Apollo 17 landing site

    Science.gov (United States)

    Bugiolacchi, Roberto; Bamford, Steven; Tar, Paul; Thacker, Neil; Crawford, Ian A.; Joy, Katherine H.; Grindrod, Peter M.; Lintott, Chris

    2016-06-01

    Moon Zoo is a citizen science project that utilises internet crowd-sourcing techniques. Moon Zoo users are asked to review high spatial resolution images from the Lunar Reconnaissance Orbiter Camera (LROC), onboard NASA's LRO spacecraft, and perform characterisation such as measuring impact crater sizes and identify morphological 'features of interest'. The tasks are designed to address issues in lunar science and to aid future exploration of the Moon. We have tested various methodologies and parameters therein to interrogate and reduce the Moon Zoo crater location and size dataset against a validated expert survey. We chose the Apollo 17 region as a test area since it offers a broad range of cratered terrains, including secondary-rich areas, older maria, and uplands. The assessment involved parallel testing in three key areas: (1) filtering of data to remove problematic mark-ups; (2) clustering methods of multiple notations per crater; and (3) derivation of alternative crater degradation indices, based on the statistical variability of multiple notations and the smoothness of local image structures. We compared different combinations of methods and parameters and assessed correlations between resulting crater summaries and the expert census. We derived the optimal data reduction steps and settings of the existing Moon Zoo crater data to agree with the expert census. Further, the regolith depth and crater degradation states derived from the data are also found to be in broad agreement with other estimates for the Apollo 17 region. Our study supports the validity of this citizen science project but also recommends improvements in key elements of the data acquisition planning and production.

  7. Solid waste information and tracking system client-server conversion project management plan

    Energy Technology Data Exchange (ETDEWEB)

    May, D.L.

    1998-04-15

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion. It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  8. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  9. The Two-Column Aerosol Project (TCAP) Science Plan

    Energy Technology Data Exchange (ETDEWEB)

    Berkowitz, CM; Berg, LK; Cziczo, DJ; Flynn, CJ; Kassianov, EI; Fast, JD; Rasch, PJ; Shilling, JE; Zaveri, RA; Zelenyuk, A; Ferrare, RA; Hostetler, CA; Cairns, B; Russell, PB; Ervens, B

    2011-07-27

    The Two-Column Aerosol Project (TCAP) field campaign will provide a detailed set of observations with which to (1) perform radiative and cloud condensation nuclei (CCN) closure studies, (2) evaluate a new retrieval algorithm for aerosol optical depth (AOD) in the presence of clouds using passive remote sensing, (3) extend a previously developed technique to investigate aerosol indirect effects, and (4) evaluate the performance of a detailed regional-scale model and a more parameterized global-scale model in simulating particle activation and AOD associated with the aging of anthropogenic aerosols. To meet these science objectives, the Atmospheric Radiation Measurement (ARM) Climate Research Facility will deploy the ARM Mobile Facility (AMF) and the Mobile Aerosol Observing System (MAOS) on Cape Cod, Massachusetts, for a 12-month period starting in the summer of 2012 in order to quantify aerosol properties, radiation, and cloud characteristics at a location subject to both clear and cloudy conditions, and clean and polluted conditions. These observations will be supplemented by two aircraft intensive observation periods (IOPs), one in the summer and a second in the winter. Each IOP will deploy one, and possibly two, aircraft depending on available resources. The first aircraft will be equipped with a suite of in situ instrumentation to provide measurements of aerosol optical properties, particle composition and direct-beam irradiance. The second aircraft will fly directly over the first and use a multi-wavelength high spectral resolution lidar (HSRL) and scanning polarimeter to provide continuous optical and cloud properties in the column below.

  10. Working together on automated vehicle guidance AVG : preliminary business plan, abridged version.

    NARCIS (Netherlands)

    Awareness (ed.)

    1998-01-01

    This plan describes the questions which will have to be answered in the short term, and the action which need to be taken in a phased and structured manner to gain insight into the potential of automated vehicle guidance (AVG).

  11. Projection scenarios of body mass index (2013-2030) for Public Health Planning in Quebec.

    Science.gov (United States)

    Lo, Ernest; Hamel, Denis; Jen, Yun; Lamontagne, Patricia; Martel, Sylvie; Steensma, Colin; Blouin, Chantal; Steele, Russell

    2014-09-25

    Projection analyses can provide estimates of the future health burden of increasing BMI and represent a relevant and useful tool for public health planning. Our study presents long-term (2013-2030) projections of the prevalence and numbers of individuals by BMI category for adult men and women in Quebec. Three applications of projections to estimate outcomes more directly pertinent to public health planning, as well as an in-depth discussion of limits, are provided with the aim of encouraging greater use of projection analyses by public health officers. The weighted compositional regression method is applied to prevalence time series derived from sixteen cross-sectional survey cycles, for scenarios of linear change and deceleration. Estimation of the component of projected change potentially amenable to intervention, future health targets and the projected impact on type 2 diabetes, were done. Obesity prevalence in Quebec is projected to rise steadily from 2013 to 2030 in both men (from 18.0-19.4% to 22.2-30.4%) and women (from 15.5-16.3% to 18.2-22.4%). Corresponding projected numbers of obese individuals are (579,000-625,000 to 790,000-1,084,000) in men and (514,000-543,000 to 661,000-816,000) in women. These projected increases are found to be primarily an 'epidemiologic' rather than 'demographic' phenomenon and thus potentially amenable to public health intervention. Assessment of obesity targets for 2020 illustrates the necessity of using projected rather than current prevalence; for example a targeted 2% drop in obesity prevalence relative to 2013 translates into a 3.6-5.4% drop relative to 2020 projected levels. Type 2 diabetes is projected to increase from 6.9% to 9.2-10.1% in men and from 5.7% to 7.1-7.5% in women, from 2011-2012 to 2030. A substantial proportion of this change (25-44% for men, and 27-43% for women) is attributable to the changing BMI distribution. Obesity in Quebec is projected to increase and should therefore continue to be a public

  12. Identifying, Planning, and Financing Beneficial Use Projects Using Dredged Material: Beneficial Use Planning Manual

    Science.gov (United States)

    2007-10-01

    the website’s foundation by providing practical guidance for project sponsors (e.g., government agencies, port authorities, marinas , industries, and...parks provid- ing such amenities as swimming, picnicking, camping, or boating. 4. Agriculture, Forestry, Horticulture, and Aquaculture : using dredged...Development Beach Nourishment (offshore berms only) Parks and Recreation Agriculture, Forestry, Horticulture, and Aquaculture Strip-Mine Reclamation

  13. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  14. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  15. Trade-Offs, Biases, and Uncertainty in Project Planning and Execution: A Problem-Based Simulation Exercise

    Science.gov (United States)

    Smith-Daniels, Dwight E.; Smith-Daniels, Vicki L.

    2008-01-01

    The ability to plan and execute projects is a fundamental skill required among managers and business school graduates. In the opening phase of a project, the project team makes decisions about the relative priority of project time, cost, and performance objectives, oftentimes without complete information about customer and stakeholder…

  16. [Post-renal transplant pregnancy: a project to plan carefully].

    Science.gov (United States)

    Trubian, Alessandra; Zaza, Gianluca; Rugiu, Carlo; Tomei, Paola; Lupo, Antonio

    2012-01-01

    Kidney transplant is the best treatment for end-stage renal disease (ESRD) as it improves the quality of life and reduces the mortality risk for most patients compared with maintenance dialysis. Additionally, evidence from the literature suggests that renal function, endocrine status and libido rapidly improve after kidney transplant, and one in 50 women of childbearing age become pregnant. Therefore, it seems clear that pregnancy after transplant is a great challenge for physicians involved in this field. The available information on pregnancy outcomes is largely derived from case reports and single-center series, which are unlikely to be representative. Moreover, poor results are less likely to be reported. Many of the reports on long-term outcome show the results of past medical, obstetric, and neonatal care, which may be very different from current practice. Attempts are being made to provide more up-to-date, representative data through national transplantation pregnancy registries. A great number of researchers worldwide have analyzed the biological and endocrinological machinery associated with this event. Additionally, several strategies have been introduced to avoid unplanned pregnancies and to minimize maternal and fetal complications in renal transplant recipients. It seems evident that the return to fertility soon after transplant is often associated with unplanned pregnancy, which can expose both mother and fetus to considerable risks. This underpins the necessity to recommend contraceptive counseling and start clinical follow-up in order to early identify possible pregnancy-related risk factors. In general, pregnancy should not be recommended within the first year after kidney transplant because the risk of acute rejection is greatest and immunosuppressive therapy the most aggressive. It should be planned when organ function and immunosuppressive therapy are stabilized and there is no sign of rejection, hypertension, or chronic infection. Additionally

  17. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  18. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  19. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    BUSSELL, J.H.

    1999-08-25

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  20. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  1. Evaluation plan for a cardiological multi-media workstation (I4C project)

    NARCIS (Netherlands)

    J.W. van der Hofstede (J.); A.B.W.M. Quak (A. B W M); A.M. van Ginneken (Astrid); P.W. MacFarlane (Peter); J. Watson (J.); P.R.H. Hendriks (P. R H); C. Zeelenberg

    1997-01-01

    textabstractThe goal of the I4C project (Integration and Communication for the Continuity of Cardiac Care) is to build a multi-media workstation for cardiac care and to assess its impact in the clinical setting. This paper describes the technical evaluation plan for the prototype.

  2. Evaluation plan for a cardiological multi-media workstation (I4C project)

    NARCIS (Netherlands)

    Hofstede, J.W. van der; Quak, A.B.; Ginneken, A.M. van; Macfarlane, P.W.; Watson, J.; Hendriks, P.R.; Zeelenberg, C.

    1997-01-01

    The goal of the I4C project (Integration and Communication for the Continuity of Cardiac Care) is to build a multi-media workstation for cardiac care and to assess its impact in the clinical setting. This paper describes the technical evaluation plan for the prototype.

  3. The gender issue in energy project planning. Welfare, empowerment or efficiency?

    NARCIS (Netherlands)

    Skutsch, Margaret

    1998-01-01

    The gap between gender policy as adopted by governments and donors, and the inclusion of gender issues in energy planning practice at project level, is great, despite the fact that there are many manuals available which demonstrate how to go about gathering gender-based data and analysing this. This

  4. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-10-31

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

  5. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan, Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-12-10

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report.

  6. 42 CFR 59.5 - What requirements must be met by a family planning project?

    Science.gov (United States)

    2010-10-01

    ... assistance, compensation for services, who coerces or endeavors to coerce any person to undergo an abortion... status. (5) Not provide abortion as a method of family planning. A project must: (i) Offer pregnant women...) which is authorized to or is under legal obligation to pay this charge. (8) Provide that charges will be...

  7. Initial single shell tank retrieval system project system engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Krieg, S.A., Westinghouse Hanford

    1996-07-31

    This System Engineering Management Plan (SEMP) describes the Systems Engineering approach that will be used to manage the retrieval of waste from the first single shell tank farm using past practice sluicing techniques. This Project SEMP is used to supplement the requirements of the TWRS SEMP, WHC-SD-WM-SEMP-002.

  8. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    Energy Technology Data Exchange (ETDEWEB)

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  9. Substituted plan analysis in the environmental impact assessment of Yongchuan wastewater treatment project

    Institute of Scientific and Technical Information of China (English)

    FANG Jun-hua

    2006-01-01

    Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.

  10. Directive 74 : industry projects gain conditional approval on tailings management plans

    Energy Technology Data Exchange (ETDEWEB)

    Eisner, M.

    2010-09-15

    Directive 74 is an industry-wide set of guidelines issued by Alberta's Energy Resources Conservation Board for managing oil sands tailings. It stipulates that operators must prepare tailings plans and report annually on tailings ponds. In addition, operators must reduce fluid tailings through fines captured in dedicated disposal areas and convert tailings into trafficable deposits that are ready for reclamation five years after the deposits have ended. The ERCB recently granted conditional approval to 3 of 6 companies on plans submitted under Directive 74, notably Syncrude, Suncor and Imperial Oil. Conditional approval was given to Syncrude's Mildred Lake and Aurora North sites. Suncor received similar approval for its Fort Hills oil sands project and its plan for its new Tailings Reduction Operations facility to reduce fluid tailings volumes. Imperial's Kearl project involving one tailings pond that will be decommissioned by 2038 also gained conditional approval. This article described the conditions that must be met in each case. The ERCB is still reviewing 3 remaining tailings plans submitted by Canadian Natural Resources Limited for its Horizon project, and Shell for the Jackpine and Muskeg River projects.

  11. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY III QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  12. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY IV QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  13. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY III QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  14. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY IV QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  15. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-10-31

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

  16. Key projects to be enforced during the 11th Five-year Plan

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ Addressing major S&T issues of strategic importance to China's socioeconomic growth, national security and development sustainability, the key projects of CAS during the period of the 11th Five-year Plan (2006-2010) are large-scale research initiatives with an expectation to give rise to S&T breakthroughs.

  17. 76 FR 75539 - Intent To Prepare an Environmental Impact Statement for the Central Everglades Planning Project...

    Science.gov (United States)

    2011-12-02

    ... Central Everglades Planning Project, Okeechobee, Glades, Martin, Palm Beach, Broward, Miami-Dade and... hydrologically and ecologically connected across more than 200 miles from north to south and across 18,000 square miles of southern Florida. In 2000, the U.S. Congress authorized the Federal government, in...

  18. The gender issue in energy project planning : welfare, empowerment or efficiency?

    NARCIS (Netherlands)

    Skutsch, Margaret M.

    1998-01-01

    The gap between gender policy as adopted by governments and donors, and the inclusion of gender issues in energy planning practice at project level, is great, despite the fact that there are many manuals available which demonstrate how to go about gathering gender-based data and analysing this. This

  19. Using Study Plans to Develop Self-Directed Learning Skills: Implications from a Pilot Project

    Science.gov (United States)

    Du, Fengning

    2012-01-01

    Self-directed learning has been lauded as a powerful learner-centered approach to involve students in every aspect of their learning. This article depicts a pilot project utilizing study plan as a vehicle to promote self-directed learning in an intensive and teacher-dominant college language program. This article seeks to identify both the…

  20. Planning of a small hydroelectric installation project - orientation aids; Vom Plan zum Werk - Orientierungshilfen

    Energy Technology Data Exchange (ETDEWEB)

    Hutarew, A. [Dr. Hutarew und Partner, Pforzheim (Germany)

    1997-12-31

    The article informs in concise form on essential elements of the plannning of a small hydro power project. Understanding and considerateness are demanded from all parties concerned when such a joint project is envisaged. Not one-sided interests should be followed; rather, everyone should contribute towards facilitating renewable energy generation. Some negative examples are cited. (orig.) [Deutsch] In der Kuerze der gebotenen Zeit wurde versucht, wesentliche Eckpfeiler in der Entstehung einer Wasserkraftanlage zu skizzieren. Ziel meiner Ausfuehrungen ist es, von allen Beteiligten Verstaendnis abzuverlangen und Ruecksichtnahme zu praktizieren, geht es doch darum, ein gemeinsames Werk entstehen zu lassen. Wir stehen nicht in der Not, einseitige Interessen zu verfechten, sondern gemeinsam an einem Baustein regenerativer Energieerzeugung zu arbeiten. Es sei mir verziehen, wenn durch die Schilderung von Negativ-Beispielen ein eher unueblicher Weg beschritten wurde. (orig.)

  1. Discrete Return Lidar in Natural Resources: Recommendations for Project Planning, Data Processing, and Deliverables

    Directory of Open Access Journals (Sweden)

    Alistair M. S. Smith

    2009-10-01

    Full Text Available Recent years have seen the progression of light detection and ranging (lidar from the realm of research to operational use in natural resource management. Numerous government agencies, private industries, and public/private stakeholder consortiums are planning or have recently acquired large-scale acquisitions, and a national U.S. lidar acquisition is likely before 2020. Before it is feasible for land managers to integrate lidar into decision making, resource assessment, or monitoring across the gambit of natural resource applications, consistent standards in project planning, data processing, and user-driven products are required. This paper introduces principal lidar acquisition parameters, and makes recommendations for project planning, processing, and product standards to better serve natural resource managers across multiple disciplines.

  2. Uncertainty and Sensitivity Analyses Plan. Draft for Peer Review: Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, J.C.; Ramsdell, J.V. Jr.

    1993-04-01

    Hanford Environmental Dose Reconstruction (HEDR) Project staff are developing mathematical models to be used to estimate the radiation dose that individuals may have received as a result of emissions since 1944 from the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. An uncertainty and sensitivity analyses plan is essential to understand and interpret the predictions from these mathematical models. This is especially true in the case of the HEDR models where the values of many parameters are unknown. This plan gives a thorough documentation of the uncertainty and hierarchical sensitivity analysis methods recommended for use on all HEDR mathematical models. The documentation includes both technical definitions and examples. In addition, an extensive demonstration of the uncertainty and sensitivity analysis process is provided using actual results from the Hanford Environmental Dose Reconstruction Integrated Codes (HEDRIC). This demonstration shows how the approaches used in the recommended plan can be adapted for all dose predictions in the HEDR Project.

  3. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  4. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  5. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  6. The demonstration projects: creating the capacity for nursing health human resource planning in Ontario's healthcare organizations.

    Science.gov (United States)

    Burkoski, Vanessa; Tepper, Joshua

    2010-05-01

    Timely access to healthcare services requires the right number, mix and distribution of appropriately educated nurses, physicians and other healthcare professionals. In Ontario, as in several other jurisdictions, changing demographics, patterns of health service utilization and an aging workforce have created challenges related to the supply of nurses available now and in the future to deliver quality patient care. From 2006 to 2009, the Nursing Secretariat (NS) of Ontario's Ministry of Health and Long-Term Care (the ministry) undertook a progressive and comprehensive approach to address the issue of nursing supply across the province through the introduction of 17 Nursing Health Human Resources Demonstration Projects (demonstration projects). The demonstration projects initiative has led to the creation of a unique collection of best practices, tools and resources aimed at improving organizational planning capacity. Evaluation of the initiative generated recommendations that may guide the ministry toward policy and program development to foster improved nursing health human resource planning capacity in Ontario healthcare organizations.

  7. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-02

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

  8. From Project to Program: Tupange's Experience with Scaling Up Family Planning Interventions in Urban Kenya.

    Science.gov (United States)

    Keyonzo, Nelson; Nyachae, Paul; Kagwe, Peter; Kilonzo, Margaret; Mumba, Feddis; Owino, Kenneth; Kichamu, George; Kigen, Bartilol; Fajans, Peter; Ghiron, Laura; Simmons, Ruth

    2015-05-01

    This paper describes how the Urban Reproductive Health Initiative in Kenya, the Tupange Project (2010-2015), successfully applied the ExpandNet approach to sustainably scale up family planning interventions, first in Machakos and Kakamega, and subsequently also in its three core cities, Nairobi, Kisumu and Mombasa. This new focus meant shifting from a "project" to a "program" approach, which required paying attention to government leadership and ownership, limiting external inputs, institutionalizing interventions in existing structures and emphasizing sustainability. The paper also highlights the project's efforts to prepare for the future scale up of Tupange's interventions in other counties to support continuing and improved access to family planning services in the new context of devolution (decentralization) in Kenya.

  9. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  10. Preliminary mapping of surficial geology of Midway Valley Yucca Mountain Project, Nye County, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Wesling, J.R.; Bullard, T.F.; Swan, F.H.; Perman, R.C.; Angell, M.M. [Geomatrix Consultants, Inc., San Francisco, CA (United States); Gibson, J.D. [Sandia National Labs., Albuquerque, NM (United States)

    1992-04-01

    The tectonics program for the proposed high-level nuclear waste repository at Yucca Mountain in southwestern Nevada must evaluate the potential for surface faulting beneath the prospective surface facilities. To help meet this goal, Quaternary surficial mapping studies and photolineament analyses were conducted to provide data for evaluating the location, recency, and style of faulting with Midway Valley at the eastern base of Yucca Mountain, the preferred location of these surface facilities. This interim report presents the preliminary results of this work.

  11. Increasing the Value of Research: A Comparison of the Literature on Critical Success Factors for Projects, IT Projects and Enterprise Resource Planning Projects

    Directory of Open Access Journals (Sweden)

    Annie Maddison Warren

    2016-11-01

    Full Text Available Since the beginning of modern project management in the 1960s, academic researchers have sought to identify a definitive list of Critical Success Factors (CSFs, the key things that project managers must get right in order to deliver a successful product. With the advent of Information Technology (IT projects and, more recently, projects to deliver Enterprise Resource Planning (ERP systems, attention has turned to identifying definitive lists of CSFs for these more specific project types. The purpose of this paper is to take stock of this research effort by examining how thinking about each type of project has evolved over time, before producing a consolidated list of CSFs for each as a basis for comparison. This process reveals a high degree of similarity, leading to the conclusion that the goal of identifying a generic list of CSFs for project management has been achieved. Therefore, rather than continuing to describe lists of CSFs, researchers could increase the value of their contribution by taking a step forward and focusing on why, despite this apparent knowledge of how to ensure their success, ERP projects continue to fail.

  12. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  13. [Modular project of the Picture Archiving and Communication System (PACS). Preliminary operational experience. I].

    Science.gov (United States)

    Dalla Palma, L; Ukovich, W; Stacul, F; Cuttin Zernich, R; Carbi, N; Giribona, P

    1990-01-01

    Since september 1988 a PAC System (Comm View by AT & T and Philips) has been operating in the Radiology Department of the University Hospital, Trieste. A research project is presently in progress aiming at providing factual evidence for the evaluation of this kind of systems as far as operational, technical, clinical and economic aspects are concerned. The general approach to this research consists in implementing and monitoring a PACS in a stepwise way, starting with a small system connected to some digital modalities only, in order to test the feasibility and effectiveness of the system within a Radiology Department, and to test the possibility of matching the PACS to the Radiological System. The present paper describes in detail the present configuration of this entry-level system and its technical features. The planned development (october 1989) is also depicted. Further developments devise at managing in an integrated way all the radiological images of the four hospitals of Trieste. At present, the PACS is currently used to manage and store on optical disks all the images acquired from the connected modalities plus the related reports, and to perform the reporting sessions for CT examinations (brain and abdomen). The present research effort is devoted to two main areas: clinical evaluation and operational analysis. The object of the operational analysis was the assessment of the impact of PACS on the operations of a Radiology Department. The general approach followed for this research consists in analysing the procedures as they are performed in the conventional way (manual operations), and comparing them to the way they are, or could be, performed using a PACS System (automatic operations). This stage of the project is divided into three phases, concerning respectively the analysis of the organization and operations before PACS, the analysis of the impact of PACS in its initial configuration and the forecast of the influence of PACS in its future setting. A

  14. A Study on Project Planning Using the Deterministic and Probabilistic Models by Network Scheduling Techniques

    Directory of Open Access Journals (Sweden)

    Rama.S

    2017-03-01

    Full Text Available Project planning is the important task in many areas like construction, resource allocation and many. A sequence of activities has to be performed to complete one task. Each activity has its unique processing time and all together to identify the critical activities which affect the completion of the project. In this paper the probabilistic and deterministic models to determine the project completion time and also the critical activities are considered. A case study on building construction project has been performed to demonstrate the application of the above said models. The two project scheduling namely PERT and CPM are used to determine numerically the different types of floating times of each activity and hence determined the critical path which plays an important role in the project completion time. Also a linear programing model has been developed to reduce the project completion time which optimize the resource allocation. To apply these techniques numerically the primary data from a housing project company in a metropolitan city has been taken, the network diagram of the activities involved in the building construction project has been drawn and the results are tabulated.

  15. Adaptive Capacity Within a Mega Project : A Case Study on Planning and Decision-Making in the Face of Complexity

    NARCIS (Netherlands)

    Giezen, Mendel; Bertolini, Luca; Salet, Willem

    2015-01-01

    There is a tendency in policy to reduce the complexity of planning and decision-making by simplifying both the process and the scope of projects. However, by framing a planning project's scope or process in a narrow way at an early stage, the possibility of adapting to changes in the context, and

  16. Adaptive Capacity Within a Mega Project : A Case Study on Planning and Decision-Making in the Face of Complexity

    NARCIS (Netherlands)

    Giezen, Mendel; Bertolini, Luca; Salet, Willem

    2015-01-01

    There is a tendency in policy to reduce the complexity of planning and decision-making by simplifying both the process and the scope of projects. However, by framing a planning project's scope or process in a narrow way at an early stage, the possibility of adapting to changes in the context, and th

  17. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    Science.gov (United States)

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  18. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... captured and included as part of the comment that is placed in the public docket and made available on the... delist from the effluent guidelines plan the rulemaking for the Coalbed Methane Extraction subcategory... Regenerated Cellulose Manufacturers (previously categorized as Plastics Molding and Forming (40 CFR Part...

  19. A First Preliminary Look: Are Corridor Charging Stations Used to Extend the Range of Electric Vehicles in The EV Project?

    Energy Technology Data Exchange (ETDEWEB)

    John Smart

    2013-01-01

    A preliminary analysis of data from The EV Project was performed to begin answering the question: are corridor charging stations used to extend the range of electric vehicles? Data analyzed were collected from Blink brand electric vehicle supply equipment (EVSE) units based in California, Washington, and Oregon. Analysis was performed on data logged between October 1, 2012 and January 1, 2013. It should be noted that as additional AC Level 2 EVSE and DC fast chargers are deployed, and as drivers become more familiar with the use of public charging infrastructure, future analysis may have dissimilar conclusions.

  20. Review Plan Using the NWD Model Review Plan for Continuing Authorities Program Section 14, 107, 111, 204, 206, 208, 1135 and Projects Directed by Guidance to Use CAP Procedures: Sheridan, Wyoming, Section 1135 Project

    Science.gov (United States)

    2014-12-19

    directed by guidance to use CAP procedures SHERIDAN , WYOMING Section 1135 Project Omaha District MSC Approval Date: 12 January...Projects Directed by Guidance to Use CAP Procedures: Sheridan , Wyoming, Section 1135 Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 ii REVIEW PLAN USING THE NWD MODEL REVIEW PLAN SHERIDAN