  1. Preliminary engineering cost trends for highway projects.

    Science.gov (United States)

    2011-10-21

    Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advan...

  2. LASL experimental engineered waste burial facility: design considerations and preliminary plan

    International Nuclear Information System (INIS)

    DePoorter, G.L.

    1980-01-01

    The LASL Experimental Engineered Waste Burial Facility is a part of the National Low-Level Waste Management Program on Shallow-Land Burial Technology. It is a test facility where basic information can be obtained on the processes that occur in shallow-land burial operations and where new concepts for shallow-land burial can be tested on an accelerated basis on an appropriate scale. The purpose of this paper is to present some of the factors considered in the design of the facility and to present a preliminary description of the experiments that are initially planned. This will be done by discussing waste management philosophies, the purposes of the facility in the context of the waste management philosophy for the facility, and the design considerations, and by describing the experiments initially planned for inclusion in the facility, and the facility site

  3. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    Kalas, P.

    1976-01-01

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP) [de

  4. 23 CFR 645.109 - Preliminary engineering.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Preliminary engineering. 645.109 Section 645.109 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS UTILITIES Utility Relocations, Adjustments, and Reimbursement § 645.109 Preliminary engineering. (a) As...

  5. Variable Cycle Engine Technology Program Planning and Definition Study

    Science.gov (United States)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  6. Energy Efficient Engine: Control system preliminary definition report

    Science.gov (United States)

    Howe, David C.

    1986-01-01

    The object of the Control Preliminary Definition Program was to define a preliminary control system concept as a part of the Energy Efficient Engine program. The program was limited to a conceptual definition of a full authority digital electronic control system. System requirements were determined and a control system was conceptually defined to these requirements. Areas requiring technological development were identified and a plan was established for implementing the identified technological features, including a control technology demonstration. A significant element of this program was a study of the potential benefits of closed-loop active clearance control, along with laboratory tests of candidate clearance sensor elements for a closed loop system.

  7. Preliminary design county plan Zeeland

    International Nuclear Information System (INIS)

    1987-01-01

    The preliminary design 'Streekplan Zeeland' (Country plan Zeeland, with regard to the location of additional nuclear power plants in Zeeland, the Netherlands) has passed through a consultation and participation round. Thereupon 132 reactions have been received. These have been incorporated and answered in two notes. This proposal deals with the principal points of the preliminary design and treats also the remarks of the committees Environmental (town and country) Planning (RO), Provincial (town and country) Planning Committee (PPC) and Association of Communities of Zeeland (VZG), on the reply notes. The preliminary design with the modifications, collected in appendix 3, is proposed to be the starting point in the drawing-up of the design-country-plan. This design subsequently will pass the formal country-plan procedure. (author). 1 fig

  8. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  9. 7 CFR 1780.55 - Preliminary engineering reports and Environmental Reports.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Preliminary engineering reports and Environmental..., Designing, Bidding, Contracting, Constructing and Inspections § 1780.55 Preliminary engineering reports and Environmental Reports. Preliminary engineering reports (PERs) must conform to customary professional standards...

  10. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  11. The MSFC Collaborative Engineering Process for Preliminary Design and Concept Definition Studies

    Science.gov (United States)

    Mulqueen, Jack; Jones, David; Hopkins, Randy

    2011-01-01

    This paper describes a collaborative engineering process developed by the Marshall Space Flight Center's Advanced Concepts Office for performing rapid preliminary design and mission concept definition studies for potential future NASA missions. The process has been developed and demonstrated for a broad range of mission studies including human space exploration missions, space transportation system studies and in-space science missions. The paper will describe the design team structure and specialized analytical tools that have been developed to enable a unique rapid design process. The collaborative engineering process consists of integrated analysis approach for mission definition, vehicle definition and system engineering. The relevance of the collaborative process elements to the standard NASA NPR 7120.1 system engineering process will be demonstrated. The study definition process flow for each study discipline will be will be outlined beginning with the study planning process, followed by definition of ground rules and assumptions, definition of study trades, mission analysis and subsystem analyses leading to a standardized set of mission concept study products. The flexibility of the collaborative engineering design process to accommodate a wide range of study objectives from technology definition and requirements definition to preliminary design studies will be addressed. The paper will also describe the applicability of the collaborative engineering process to include an integrated systems analysis approach for evaluating the functional requirements of evolving system technologies and capabilities needed to meet the needs of future NASA programs.

  12. Results and future plans for the innovative basic research on high temperature engineering

    International Nuclear Information System (INIS)

    2001-05-01

    The High Temperature Engineering Test Reactor (HTTR) is under the rise-to-power stage at the Oarai Research Establishment of Japan Atomic Energy Research Institute (JAERI). This reactor is aimed not only at establishment of the infrastructural technology on high temperature gas-cooled reactor and its upgrading, but also at promotion of the innovative basic research on high temperature engineering. The research is a series of innovative high-temperature irradiation studies, making the best use of the characteristic of the HTTR that it provides a very wide irradiation space at high temperatures. The JAERI has been conducting preliminary tests of the innovative research since 1994, in collaboration with universities and other research institutes, in the fields of 1) new materials development, 2) high temperature radiation chemistry and fusion-related research, and 3) high temperature irradiation techniques and other nuclear research. The HTTR Utilization Research Committee has been examining the results and methodology of the preliminary tests and the future plans, as well as examining the preparatory arrangements of facilities for the HTTR irradiation and post-irradiation examinations. This report presents a summary of results of the preliminary tests and preparatory arrangements for about seven years, together with an outline of the future plans. (author)

  13. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    Science.gov (United States)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  14. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  15. Renewable Energy Park - Preliminary Feasibility & Engineering Report

    Energy Technology Data Exchange (ETDEWEB)

    Ariwite, Roderick [Fallon Paiute Shoshone Tribe, NV (United States)

    2015-07-31

    This "Renewable Energy Park - Preliminary Feasibility & Engineering Report" seeks to provide an overall assessment and review of renewable energy development opportunities on the Fallon Indian Reservation and Colony Lands.

  16. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  17. Preliminary rock mechanics laboratory: Investigation plan

    International Nuclear Information System (INIS)

    Oschman, K.P.; Hummeldorf, R.G.; Hume, H.R.; Karakouzian, M.; Vakili, J.E.

    1987-01-01

    This document presents the rationale for rock mechanics laboratory testing (including the supporting analysis and numerical modeling) planned for the site characterization of a nuclear waste repository in salt. This plan first identifies what information is required for regulatory and design purposes, and then presents the rationale for the testing that satisfies the required information needs. A preliminary estimate of the minimum sampling requirements for rock laboratory testing during site characterization is also presented. Periodic revision of this document is planned

  18. Plans and Preliminary Results of Fundamental Studies of Ice Crystal Icing Physics in the NASA Propulsion Systems Laboratory

    Science.gov (United States)

    Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas

    2017-01-01

    This paper describes plans and preliminary results for using the NASA Propulsion Systems Lab (PSL) to experimentally study the fundamental physics of ice-crystal ice accretion. NASA is evaluating whether this facility, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This paper presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.

  19. Preliminary plan for treating mixed waste

    International Nuclear Information System (INIS)

    Vandegrift, G.F.; Conner, C.; Hutter, J.C.; Leonard, R.A.; Nunez, L.; Sedlet, J.; Wygmans, D.G.

    1993-06-01

    A preliminary waste treatment plan was developed for disposing of radioactive inorganic liquid wastes that contain hazardous metals and/or hazardous acid concentrations at Argonne National Laboratory. This plan, which involves neutralization and sulfide precipitation followed by filtration, reduces the concentration of hazardous metals and the acidity so that the filtrate liquid is simply a low-level radioactive waste that can be fed to a low-level waste evaporator

  20. Tank waste remediation system engineering plan

    International Nuclear Information System (INIS)

    Rifaey, S.H.

    1998-01-01

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ''as is'' condition of engineering practice, systems, and facilities to the desired ''to be'' configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively

  1. Researches on Preliminary Chemical Reactions in Spark-Ignition Engines

    Science.gov (United States)

    1943-06-01

    compression type, without ignition, the resulting preliminary reactions being detectable and meas- urable thermometrically . Contents I. Influence of Preliminary...thoroughly insulated be- tween the carburettor and the engine, by aluminium foil and asbestos. -I -I " I" I ’I il i~ " !, I I 1𔃻I I’ ) To enable the

  2. Business plan basics for engineers

    DEFF Research Database (Denmark)

    Tanev, Stoyan; Rasmussen, Erik Stavnsager; Riber Hansen, Katrine

    2016-01-01

    This chapter focuses on the nature of business planning activities from an engineering entre-/intra-preneurial perspective. It is therefore not limited to technology start-ups or newly created engineering firms but equally relevant for established firms investing in projects that assemble......-driven business environments which are typical the business playground for engineering professionals, the chapter focuses on describing the two key components of the business planning process: the articulation and the development of a viable business model, and managing the scaling up and the growth...... of the business. The de-scription does not pretend to exhaust the topic and continuously refers to several excellent recent publications that could complement the learning process of young and advanced engi-neering professionals interested in knowing more about the business planning process....

  3. Software Engineering Improvement Activities/Plan

    Science.gov (United States)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  4. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  5. Preliminary Validation and Verification Plan for CAREM Reactor Protection System

    International Nuclear Information System (INIS)

    Fittipaldi, Ana; Maciel Felix

    2000-01-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan

  6. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  7. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  8. 76 FR 78183 - Preliminary Plan for Retrospective Review Under E.O. 13579

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF JUSTICE Parole Commission 28 CFR Part 2 [Docket No. USPC-2011-01] Preliminary Plan for Retrospective Review Under E.O. 13579 AGENCY: United States Parole Commission, Justice. ACTION: Request for comments. SUMMARY: The U.S. Parole Commission is asking for comments on its preliminary plan...

  9. Engineering Task Plan for Routine Engineering Support for Core Sampler System

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Routine engineering support is required during normal operation of the core sampler trucks and associated ancillary equipment. This engineering support consists of, but is not limited to, troubleshooting operation problems, correcting minor design problems, assistance with work package preparation, assistance with procurement, fabrication shop support, planning of engineering tasks and preparation of associated Engineering Task Plans (ETP) and Engineering Service Requests (ESR). This ETP is the management plan document for implementing routine engineering support. Any additional changes to the scope of this ETP shall require a Letter of Instruction from Lockheed Martin Hanford Corp (LMHC). This document will also be the Work Planning Document for Development Control (HNF 1999a). The scope of this task will be to provide routine engineering support for Characterization equipment as required to support Characterization Operations. A task by task decision will be made by management to determine which tasks will be done per this ETP and if additional ETPs and/or ESRs are required. Due to the unique nature of this task, the only identifiable deliverable is to provide support as requested. Deliverables will be recorded in a task logbook as activities are identified. ESRs will be generated for tasks that require more than 40 person hours to complete, per Characterization Engineering Desk Instructions (DI 1999a)

  10. ERG and GRG review of the draft of ''preliminary test plan for in situ testing from an exploratory shaft in salt - October 1983''

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1986-03-01

    The Engineering Review Group (ERG) and Geologic Review Group (GRG) were established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering- and geologic-related issues in the US Department of Energy's nuclear waste repository program. The January 1984 meeting of the ERG and GRG reviewed the In Situ Test Plan (ISTP) titled ''Preliminary Test Plan for In Situ Testing From an Exploratory Shaft in Salt - October 1983.'' This report documents the ERG's and GRG's comments and recommendations on this subject and the ONWI responses to the specific points raised by the ERG and GRG. 6 refs., 2 figs., 1 tab

  11. Definition study for variable cycle engine testbed engine and associated test program

    Science.gov (United States)

    Vdoviak, J. W.

    1978-01-01

    The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.

  12. Engineering Sciences Strategic Leadership Plan

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Heidi A. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-02-14

    The purpose of this report is to promote the three key elements of engineering capabilities, staff and engagement in coordination with an R&D investment cycle; and establish an Engineering Steering Council to own and guide this leadership plan.

  13. Preliminary conceptual study of engineering-scale pyroprocess demonstration facility

    International Nuclear Information System (INIS)

    Moon, Seong-In; Chong, Won-Myung; You, Gil-Sung; Ku, Jeong-Hoe; Kim, Ho-Dong

    2013-01-01

    Highlights: ► The conceptual design of a pyroprocess demonstration facility was performed. ► The design requirements for the pyroprocess hot cell and equipment were determined. ► The maintenance concept for the pyroprocess hot cell was presented. -- Abstract: The development of an effective management technology of spent fuel is important to enhance environmental friendliness, cost viability and proliferation resistance. In Korea, pyroprocess technology has been considered as a fuel cycle option to solve the spent fuel accumulation problems. PRIDE (PyRoprocess Integrated inactive DEmonstration facility) has been developed from 2007 to 2012 in Korea as a cold test facility to support integrated pyroprocessing and an equipment demonstration, which is essential to verify the pyroprocess technology. As the next stage of PRIDE, the design requirements of an engineering-scale demonstration facility are being developed, and the preliminary conceptual design of the facility is being performed for the future. In this paper, the main design requirements for the engineering-scale pyroprocess demonstration facility were studied in the throughput of 10tHM a year. For the preliminary conceptual design of the facility, the design basis of the pyroprocess hot cell was suggested, and the main equipment, main process area, operation area, maintenance area, and so on were arranged in consideration of the effective operation of the hot cells. Also, the argon system was designed to provide and maintain a proper inert environment for the pyroprocess. The preliminary conceptual design data will be used to review the validity of the engineering-scale pyroprocess demonstration facility that enhances both safety and nonproliferation

  14. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  15. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1994-01-01

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  16. Test plan for engineering scale electrostatic enclosure demonstration

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1993-02-01

    This test plan describes experimental details of an engineering-scale electrostatic enclosure demonstration to be performed at the Idaho National Engineering Laboratory in fiscal year (FY)-93. This demonstration will investigate, in the engineering scale, the feasibility of using electrostatic enclosures and devices to control the spread of contaminants during transuranic waste handling operations. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the FY-93 experiments are included in this plan

  17. Preliminary site design for the SP-100 ground engineering test

    International Nuclear Information System (INIS)

    Cox, C.M.; Miller, W.C.; Mahaffey, M.K.

    1986-04-01

    In November, 1985, Hanford was selected by the Department of Energy (DOE) as the preferred site for a full-scale test of the integrated nuclear subsystem for SP-100. The Hanford Engineering Development Laboratory, operated by Westinghouse Hanford Company, was assigned as the lead contractor for the Test Site. The nuclear subsystem, which includes the reactor and its primary heat transport system, will be provided by the System Developer, another contractor to be selected by DOE in late FY-1986. In addition to reactor operations, test site responsibilities include preparation of the facility plus design, procurement and installation of a vacuum chamber to house the reactor, a secondary heat transport system to dispose of the reactor heat, a facility control system, and postirradiation examination. At the conclusion of the test program, waste disposal and facility decommissioning are required. The test site must also prepare appropriate environmental and safety evaluations. This paper summarizes the preliminary design requirements, the status of design, and plans to achieve full power operation of the test reactor in September, 1990

  18. Perspectives and Plans for Graduate Studies. 11, Engineering 1974-75; F. Civil Engineering.

    Science.gov (United States)

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    A series of studies carried out by the Advisory Committee on Academic Planning (ACAP) published by the Council of Ontario Universities (COU) dealt with a planning study of doctoral work in engineering that was conducted in several parts corresponding to the various disciplines within engineering. This document, which is one part of that study,…

  19. Synchronous method and engineering tool for the strategic factory planning

    OpenAIRE

    Abdul Rahman, O.; Jaeger, J.; Constantinescu, C.

    2011-01-01

    This paper presents the approach to combine two reference methods and engineering tools, for "Factory Performance and Investment Planning«as well as "Value Added Ideal Production Network Planning". The resulted synchronous method aims to support factories in the strategic planning as well as in the network planning. The corresponding engineering tool is employed for assessment planning, sales planning, capacity planning and production costs planning under the consideration of dynamic and stoc...

  20. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  1. GRIST-2 preliminary test plan and requirements for fuel fabrication and preirradiation

    International Nuclear Information System (INIS)

    Tang, I.M.; Harmon, D.P.; Torri, A.

    1978-12-01

    The preliminary version of the GRIST-2 test plan has been developed for the planned initial 5 years (1984 to 1989) of TREAT-Upgrade in-pile tests. These tests will be employed to study the phenomenology and integral behavior of GCFR core disruptive accidents (CDAs) and to support the Final Safety Analysis Report (FSAR) CDA analyses for the demonstration plant licensing. The preliminary test plan is outlined. Test Phases I and II are for the fresh fuel (preconditioned or not) CDA behavior at the beginning-of-life (BOL) reactor state. Phase III is for the reactor state that contains irradiated fuel with a saturated content of helium and fission gas. Phase IV is for larger bundle tests and scaling effects

  2. Automatic Planning of External Search Engine Optimization

    Directory of Open Access Journals (Sweden)

    Vita Jasevičiūtė

    2015-07-01

    Full Text Available This paper describes an investigation of the external search engine optimization (SEO action planning tool, dedicated to automatically extract a small set of most important keywords for each month during whole year period. The keywords in the set are extracted accordingly to external measured parameters, such as average number of searches during the year and for every month individually. Additionally the position of the optimized web site for each keyword is taken into account. The generated optimization plan is similar to the optimization plans prepared manually by the SEO professionals and can be successfully used as a support tool for web site search engine optimization.

  3. Preliminary waste acceptance requirements for the planned Konrad repository

    International Nuclear Information System (INIS)

    Warnecke, E.; Brennecke, P.

    1987-01-01

    The Physikalisch-Technische Bundesanstalt (PTB) has established Preliminary Waste Acceptance Requirements for the planned Konrad repository. These requirements were developed, in accordance with the Safety Criteria of the Reactor Safety Commission, with the help of a site specific safety assessment; they are under the reservation of the plan approval procedure, which is still in progress. In developing waste acceptance requirements, the PTB fulfills one of its duties as the institute responsible for waste disposal and gives guidelines for waste conditioning to waste producers and conditioners. (orig.) [de

  4. Preliminary safety evaluation, based on initial site investigation data. Planning document

    International Nuclear Information System (INIS)

    Hedin, Allan

    2002-12-01

    This report is a planning document for the preliminary safety evaluations (PSE) to be carried out at the end of the initial stage of SKBs ongoing site investigations for a deep repository for spent nuclear fuel. The main purposes of the evaluations are to determine whether earlier judgements of the suitability of the candidate area for a deep repository with respect to long-term safety holds up in the light of borehole data and to provide feed-back to continued site investigations and site specific repository design. The preliminary safety evaluations will be carried out by a safety assessment group, based on a site model, being part of a site description, provided by a site modelling group and a repository layout within that model suggested by a repository engineering group. The site model contains the geometric features of the site as well as properties of the host rock. Several alternative interpretations of the site data will likely be suggested. Also the biosphere is included in the site model. A first task for the PSE will be to compare the rock properties described in the site model to previously established criteria for a suitable host rock. This report gives an example of such a comparison. In order to provide more detailed feedback, a number of thermal, hydrological, mechanical and chemical analyses of the site will also be included in the evaluation. The selection of analyses is derived from the set of geosphere and biosphere analyses preliminarily planned for the comprehensive safety assessment named SR-SITE, which will be based on a complete site investigation. The selection is dictated primarily by the expected feedback to continued site investigations and by the availability of data after the PSE. The repository engineering group will consider several safety related factors in suggesting a repository layout: Thermal calculations will be made to determine a minimum distance between canisters avoiding canister surface temperatures above 100 deg C

  5. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  6. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  7. Deep Underground Science and Engineering Laboratory - Preliminary Design Report

    CERN Document Server

    Lesko, Kevin T; Alonso, Jose; Bauer, Paul; Chan, Yuen-Dat; Chinowsky, William; Dangermond, Steve; Detwiler, Jason A; De Vries, Syd; DiGennaro, Richard; Exter, Elizabeth; Fernandez, Felix B; Freer, Elizabeth L; Gilchriese, Murdock G D; Goldschmidt, Azriel; Grammann, Ben; Griffing, William; Harlan, Bill; Haxton, Wick C; Headley, Michael; Heise, Jaret; Hladysz, Zbigniew; Jacobs, Dianna; Johnson, Michael; Kadel, Richard; Kaufman, Robert; King, Greg; Lanou, Robert; Lemut, Alberto; Ligeti, Zoltan; Marks, Steve; Martin, Ryan D; Matthesen, John; Matthew, Brendan; Matthews, Warren; McConnell, Randall; McElroy, William; Meyer, Deborah; Norris, Margaret; Plate, David; Robinson, Kem E; Roggenthen, William; Salve, Rohit; Sayler, Ben; Scheetz, John; Tarpinian, Jim; Taylor, David; Vardiman, David; Wheeler, Ron; Willhite, Joshua; Yeck, James

    2011-01-01

    The DUSEL Project has produced the Preliminary Design of the Deep Underground Science and Engineering Laboratory (DUSEL) at the rehabilitated former Homestake mine in South Dakota. The Facility design calls for, on the surface, two new buildings - one a visitor and education center, the other an experiment assembly hall - and multiple repurposed existing buildings. To support underground research activities, the design includes two laboratory modules and additional spaces at a level 4,850 feet underground for physics, biology, engineering, and Earth science experiments. On the same level, the design includes a Department of Energy-shepherded Large Cavity supporting the Long Baseline Neutrino Experiment. At the 7,400-feet level, the design incorporates one laboratory module and additional spaces for physics and Earth science efforts. With input from some 25 science and engineering collaborations, the Project has designed critical experimental space and infrastructure needs, including space for a suite of multi...

  8. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  9. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  10. Engineering test facility

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Sager, P.H.

    1981-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The ETF would provide a test-bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy established the ETF Design Center activity to prepare the design of the ETF. This paper described the design status of the ETF

  11. Business planning for scientists and engineers

    Energy Technology Data Exchange (ETDEWEB)

    Servo, J.C.; Hauler, P.D.

    1992-03-01

    Business Planning for Scientists and Engineers is a combination text/workbook intended for use by individuals and firms having received Phase II SBIR funding (Small Business Innovation Research). It is used to best advantage in combination with other aspects of the Commercialization Assistance Project developed by Dawnbreaker for the US Department of Energy. Although there are many books on the market which indicate the desired contents of a business plan, there are none which clearly indicate how to find the needed information. This book focuses on the how of business planning: how to find the needed information; how to keep yourself honest about the market potential; how to develop the plan; how to sell and use the plan.

  12. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  13. Preliminary engineering specifications for a test demonstration multilayer protective barrier cover system

    International Nuclear Information System (INIS)

    Phillips, S.J.; Gilbert, T.W.; Adams, M.R.

    1985-03-01

    This report presents preliminary engineering specifications for a test protective barrier cover system and support radiohydrology facility to be constructed at the Hanford Protective Barrier Test Facility (PBTF). Construction of this test barrier and related radiohydrology facility is part of a continuing effort to provide construction experience and performance evaluation of alternative barrier designs used for long-term isolation of disposed radioactive waste materials. Design specifications given in this report are tentative, based on interim engineering and computer simulation design efforts. Final definitive design specifications and engineering prints will be produced in FY 1986. 6 refs., 10 figs., 1 tab

  14. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  15. Ecological aspects in civil engineering and physical planning

    International Nuclear Information System (INIS)

    Engelhardt, W.

    1983-01-01

    This book presents an introduction to aspects of ecology and has been quite purposefully restricted to the aspects of interest in connection with civil engineering and physical planning. The various chapters deal with soil, water bodies, air, plants and plant communities, trees in towns, animal life, noise and health, as well as high-energy radiation and its impact on man and environment. The book is intended to make engineers and other interested readers working in the technical professions familiar with ecologic principles and ecologically minded thinking in order to pave the way for ecology-mindedness in civil engineering and physical planning, hopefully contributing to avoiding mistakes and their harmful consequences. (orig.) [de

  16. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  17. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  18. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  19. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  20. Proper project planning helps minimize overruns and delays

    International Nuclear Information System (INIS)

    Donnelly, G.; Cooney, D.J.

    1994-01-01

    This paper describes planning methods to help minimize cost overruns during the construction of oil and gas pipelines. These steps include background data collection methods, field surveys, determining preliminary pipeline routes, regulatory agency pre-application meetings, and preliminary engineering. Methods for planning also include preliminary aerial mapping, biological assessments, cultural resources investigations, wetlands delineation, geotechnical investigations, and environmental audits. Identification of potential problems can allow for rerouting of the pipeline or remediation processes before they are raised during the permitting process. By coordinating these events from the very beginning, significant cost savings will result that prevent having to rebudget for them after the permitting process starts

  1. Towards a Tissue-Engineered Ligament: Design and Preliminary Evaluation of a Dedicated Multi-Chamber Tension-Torsion Bioreactor

    Directory of Open Access Journals (Sweden)

    Cédric P. Laurent

    2014-02-01

    Full Text Available Tissue engineering may constitute a promising alternative to current strategies in ligament repair, providing that suitable scaffolds and culture conditions are proposed. The objective of the present contribution is to present the design and instrumentation of a novel multi-chamber tension-torsion bioreactor dedicated to ligament tissue engineering. A preliminary biological evaluation of a new braided scaffold within this bioreactor under dynamic loading is reported, starting with the development of a dedicated seeding protocol validated from static cultures. The results of these preliminary biological characterizations confirm that the present combination of scaffold, seeding protocol and bioreactor may enable us to head towards a suitable ligament tissue-engineered construct.

  2. Involving construction in the preliminary engineering process

    International Nuclear Information System (INIS)

    Mahoney, D.T. Jr.; Boccieri, S.V. Jr.

    1994-01-01

    With today's high cost associated with modifications in nuclear power plants, it is imperative that the authors continue to investigate ways to cut costs but at the same time improve efficiency and reduce radiation exposure to those directly associated with the implementation of modifications. The success associated with involving construction in the preliminary engineering process will not only cut costs and improve efficiency but will establish a Team Building concept to provide accountability to all those associated with the implementation of the task. This form of partnering focuses on the solutions rather than highlighting the difficulties. This paper will demonstrate techniques to implement such ideas and provide examples to corroborate actual successes already achieved

  3. The engineering test facility

    International Nuclear Information System (INIS)

    Steiner, D.; Becraft, W.R.; Sager, P.H.

    1981-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The ETF would provide a test-bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy established the ETF Design Center activity to prepare the design of the ETF. This paper describes the design status of the ETF. (orig.)

  4. Automated treatment planning engine for prostate seed implant brachytherapy

    International Nuclear Information System (INIS)

    Yu Yan; Zhang, J.B.Y.; Brasacchio, Ralph A.; Okunieff, Paul G.; Rubens, Deborah J.; Strang, John G.; Soni, Arvind; Messing, Edward M.

    1999-01-01

    Purpose: To develop a computer-intelligent planning engine for automated treatment planning and optimization of ultrasound- and template-guided prostate seed implants. Methods and Materials: The genetic algorithm was modified to reflect the 2D nature of the implantation template. A multi-objective decision scheme was used to rank competing solutions, taking into account dose uniformity and conformity to the planning target volume (PTV), dose-sparing of the urethra and the rectum, and the sensitivity of the resulting dosimetry to seed misplacement. Optimized treatment plans were evaluated using selected dosimetric quantifiers, dose-volume histogram (DVH), and sensitivity analysis based on simulated seed placement errors. These dosimetric planning components were integrated into the Prostate Implant Planning Engine for Radiotherapy (PIPER). Results: PIPER has been used to produce a variety of plans for prostate seed implants. In general, maximization of the minimum peripheral dose (mPD) for given implanted total source strength tended to produce peripherally weighted seed patterns. Minimization of the urethral dose further reduced the loading in the central region of the PTV. Isodose conformity to the PTV was achieved when the set of objectives did not reflect seed positioning uncertainties; the corresponding optimal plan generally required fewer seeds and higher source strength per seed compared to the manual planning experience. When seed placement uncertainties were introduced into the set of treatment planning objectives, the optimal plan tended to reach a compromise between the preplanned outcome and the likelihood of retaining the preferred outcome after implantation. The reduction in the volatility of such seed configurations optimized under uncertainty was verified by sensitivity studies. Conclusion: An automated treatment planning engine incorporating real-time sensitivity analysis was found to be a useful tool in dosimetric planning for prostate

  5. The preliminary research for biosynthetic engineering by radiation fusion technology

    Energy Technology Data Exchange (ETDEWEB)

    Roh, Chang Hyun; Jung, U Hee; Park, Hae Ran [KAERI, Daejeon (Korea, Republic of)

    2012-01-15

    The purpose of this project is to elucidate the solution to the production of bioactive substance using biotransformation process from core technology of biosynthetic engineering by radiation fusion technology. And, this strategy will provide core technology for development of drugs as new concept and category. Research scopes and contents of project include 1) The development of mutant for biosynthetic engineering by radiation fusion technology 2) The development of host for biosynthetic engineering by radiation fusion technology 3) The preliminary study for biosynthetic engineering of isoflavone by radiation fusion technology. The results are as follows. Isoflavone compounds(daidzein, hydroxylated isoflavone) were analyzed by GC-MS. The study of radiation doses and p-NCA high-throughput screening for mutant development were elucidated. And, it was carried out the study of radiation doses for host development. Furthermore, the study of redox partner and construction of recombinant strain for region-specific hydroxylation(P450, redox partner). In addition, the biological effect of 6,7,4'-trihydroxyisoflavone as an anti-obesity agent was elucidated in this study.

  6. Engineering hydro's future

    International Nuclear Information System (INIS)

    Anderson, J.L.

    1992-01-01

    In this challenging hydropower market, hydropower engineering services are in high demand. The number of new hydropower projects entering the pipeline may have slowed in recent years but that does not mean work is not being done. Independent developers, utilities and municipalities are carrying out a considerable amount of hydropower activity. Whatever the work involves - preliminary planning, licensing and relicensing, environmental mitigation, plant rehabilitation or new-plant startup - engineering firms are finding a brisk market for their services. The complexity of the regulatory framework makes hydropower facility and other water resource work more important then ever. Executives of three engineering firms - Acres International, Harza Engineering and Black and Veatch - active in these areas discuss their views on the future of the hydropower engineering market

  7. Textual appropriation in engineering master's theses: a preliminary study.

    Science.gov (United States)

    Eckel, Edward J

    2011-09-01

    In the thesis literature review, an engineering graduate student is expected to place original research in the context of previous work by other researchers. However, for some students, particularly those for whom English is a second language, the literature review may be a mixture of original writing and verbatim source text appropriated without quotations. Such problematic use of source material leaves students vulnerable to an accusation of plagiarism, which carries severe consequences. Is such textual appropriation common in engineering master's writing? Furthermore, what, if anything, can be concluded when two texts have been found to have textual material in common? Do existing definitions of plagiarism provide a sufficient framework for determining if an instance of copying is transgressive or not? In a preliminary attempt to answer these questions, text strings from a random sample of 100 engineering master's theses from the ProQuest Dissertations and Theses database were searched for appropriated verbatim source text using the Google search engine. The results suggest that textual borrowing may indeed be a common feature of the master's engineering literature review, raising questions about the ability of graduate students to synthesize the literature. The study also illustrates the difficulties of making a determination of plagiarism based on simple textual similarity. A context-specific approach is recommended when dealing with any instance of apparent copying.

  8. Preliminary Technology Maturation Plan for Immobilization of High-Level Waste in Glass Ceramics

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Crum, Jarrod V.; Sevigny, Gary J.; Smith, G L.

    2012-09-30

    A technology maturation plan (TMP) was developed for immobilization of high-level waste (HLW) raffinate in a glass ceramics waste form using a cold-crucible induction melter (CCIM). The TMP was prepared by the following process: 1) define the reference process and boundaries of the technology being matured, 2) evaluate the technology elements and identify the critical technology elements (CTE), 3) identify the technology readiness level (TRL) of each of the CTE’s using the DOE G 413.3-4, 4) describe the development and demonstration activities required to advance the TRLs to 4 and 6 in order, and 5) prepare a preliminary plan to conduct the development and demonstration. Results of the technology readiness assessment identified five CTE’s and found relatively low TRL’s for each of them: • Mixing, sampling, and analysis of waste slurry and melter feed: TRL-1 • Feeding, melting, and pouring: TRL-1 • Glass ceramic formulation: TRL-1 • Canister cooling and crystallization: TRL-1 • Canister decontamination: TRL-4 Although the TRL’s are low for most of these CTE’s (TRL-1), the effort required to advance them to higher values. The activities required to advance the TRL’s are listed below: • Complete this TMP • Perform a preliminary engineering study • Characterize, estimate, and simulate waste to be treated • Laboratory scale glass ceramic testing • Melter and off-gas testing with simulants • Test the mixing, sampling, and analyses • Canister testing • Decontamination system testing • Issue a requirements document • Issue a risk management document • Complete preliminary design • Integrated pilot testing • Issue a waste compliance plan A preliminary schedule and budget were developed to complete these activities as summarized in the following table (assuming 2012 dollars). TRL Budget Year MSA FMP GCF CCC CD Overall $M 2012 1 1 1 1 4 1 0.3 2013 2 2 1 1 4 1 1.3 2014 2 3 1 1 4 1 1.8 2015 2 3 2 2 4 2 2.6 2016 2 3 2 2 4 2 4

  9. Engineering test facility design center

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The ETF would provide a test bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy established the ETF Design Center activity to prepare the design of the ETF. This section describes the status of this design

  10. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. E. Industrial Engineering and Systems Design. Report No. 74-22.

    Science.gov (United States)

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…

  11. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  12. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  13. 76 FR 81462 - Preliminary Plan for Retrospective Analysis of Existing Rules

    Science.gov (United States)

    2011-12-28

    ... economic development. The Commission seeks input from the public on all aspects of its preliminary plan... technological and economic opportunities of the new millennium. As part of the Commission's goal to be a model... to achieve its statutory objectives while removing burdens on industry and promoting innovation and...

  14. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  15. Waste feed delivery program systems engineering implementation plan

    International Nuclear Information System (INIS)

    O'Toole, S.M.; Hendel, B.J.

    1998-01-01

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products

  16. Affordable Development and Demonstration of a Small NTR Engine and Stage: A Preliminary NASA, DOE, and Industry Assessment

    Science.gov (United States)

    Borowski, Stanley K.; Sefcik, Robert J.; Fittje, James E.; McCurdy, David R.; Qualls, Arthur L.; Schnitzler, Bruce G.; Werner, James E.; Weitzberg, Abraham; Joyner, Claude R.

    2015-01-01

    The Nuclear Thermal Rocket (NTR) represents the next evolutionary step in cryogenic liquid rocket engines. Deriving its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core, the NTR can generate high thrust at a specific impulse of approx. 900 seconds or more - twice that of today's best chemical rockets. In FY'11, as part of the AISP project, NASA proposed a Nuclear Thermal Propulsion (NTP) effort that envisioned two key activities - "Foundational Technology Development" followed by system-level "Technology Demonstrations". Five near-term NTP activities identified for Foundational Technology Development became the basis for the NCPS project started in FY'12 and funded by NASA's AES program. During Phase 1 (FY'12-14), the NCPS project was focused on (1) Recapturing fuel processing techniques and fabricating partial length "heritage" fuel elements for the two candidate fuel forms identified by NASA and the DOE - NERVA graphite "composite" and the uranium dioxide (UO2) in tungsten "cermet". The Phase 1 effort also included: (2) Engine Conceptual Design; (3) Mission Analysis and Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable and Sustainable NTP Development Strategy. During FY'14, a preliminary plan for DDT&E was outlined by GRC, the DOE and industry for NASA HQ that involved significant system-level demonstration projects that included GTD tests at the NNSS, followed by a FTD mission. To reduce development costs, the GTD and FTD tests use a small, low thrust (approx. 7.5 or 16.5 klbf) engine. Both engines use graphite composite fuel and a "common" fuel element design that is scalable to higher thrust (approx. 25 klbf) engines by increasing the number of elements in a larger diameter core that can produce greater thermal power output. To keep the FTD mission cost down, a simple "1-burn" lunar flyby mission was considered along with

  17. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  18. Adapting planning and scheduling concepts to an engineering perspective: Key issues and successful techniques

    International Nuclear Information System (INIS)

    Finnegan, J.M.

    1986-01-01

    Traditional approaches to engineering planning are slanted toward the formats and interests of downstream implementation, and do not always consider the form and criticality of the front-end engineering development process. These processes and scopes are less defined and more subjective than most construction and operations tasks, and require flexible scheduling methods. This paper discusses the characteristics and requirement of engineering schedules, presents concepts for approaching planning in this field, and illustrates simple methods for developing and analyzing engineering plans, and evaluating schedule performance. Engineering plans are structured into a schedule hierarchy which delineates appropriate control and responsibilities, and is governed by key evaluation and decision milestones. Schedule risk analysis considers the uncertainty of engineering tasks, and critical resource constraints. Methods to evaluate schedule performance recognize that engineers and managers are responsible for adequate planning and forecasting, and quality decisions, even if they cannot control all factors influencing schedule results

  19. Planning and forecasting demand for aircraft engines airline fleet

    Directory of Open Access Journals (Sweden)

    А.Г. Кучер

    2007-03-01

    Full Text Available  The questions of air-engines supply system processes analysis on the basis of order planning and air-engine demand forecasting of airline’s air fleet with the use of imitating simulation methods are considered.

  20. Preliminary Validation and Verification Plan for CAREM Reactor Protection System; Modelo de Plan Preliminar de Validacion y Verificacion para el Sistema de Proteccion del Reactor CAREM

    Energy Technology Data Exchange (ETDEWEB)

    Fittipaldi, Ana; Felix, Maciel [Comision Nacional de Energia Atomica, Centro Atomico Bariloche (Argentina)

    2000-07-01

    The purpose of this paper, is to present a preliminary validation and verification plan for a particular architecture proposed for the CAREM reactor protection system with software modules (computer based system).These software modules can be either own design systems or systems based in commercial modules such as programmable logic controllers (PLC) redundant of last generation.During this study, it was seen that this plan can also be used as a validation and verification plan of commercial products (COTS, commercial off the shelf) and/or smart transmitters.The software life cycle proposed and its features are presented, and also the advantages of the preliminary validation and verification plan.

  1. Remote Laboratory Collaboration Plan in Communications Engineering

    Directory of Open Access Journals (Sweden)

    Akram Ahmad Abu-aisheh

    2012-11-01

    Full Text Available Communications laboratories for electrical engineering undergraduates typically require that students perform practical experiments and document findings as part of their knowledge and skills development. Laboratory experiments are usally designed to support and reinforce theories presented in the classroom and foster independent thinking; however, the capital cost of equipment needed to sustain a viable laboratory environment is large and ongoing maintenance is an annual expense. Consequently, there is a need to identify and validate more economic solutions for engineering laboratories. This paper presents a remote laboratory collaboration plan for use in an elctrical engineering communications course.

  2. Graceful Failure, Engineering, and Planning for Extremes: The Engineering for Climate Extremes Partnership (ECEP)

    Science.gov (United States)

    Bruyere, C. L.; Tye, M. R.; Holland, G. J.; Done, J.

    2015-12-01

    Graceful failure acknowledges that all systems will fail at some level and incorporates the potential for failure as a key component of engineering design, community planning, and the associated research and development. This is a fundamental component of the ECEP, an interdisciplinary partnership bringing together scientific, engineering, cultural, business and government expertise to develop robust, well-communicated predictions and advice on the impacts of weather and climate extremes in support of decision-making. A feature of the partnership is the manner in which basic and applied research and development is conducted in direct collaboration with the end user. A major ECEP focus is the Global Risk and Resilience Toolbox (GRRT) that is aimed at developing public-domain, risk-modeling and response data and planning system in support of engineering design, and community planning and adaptation activities. In this presentation I will outline the overall ECEP and GRIP activities, and expand on the 'graceful failure' concept. Specific examples for direct assessment and prediction of hurricane impacts and damage potential will be included.

  3. Engineering task plan for BX/BY compressor upgrade

    International Nuclear Information System (INIS)

    Strand, R.G.

    1995-01-01

    This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ''BX-BY Compressor Upgrade'' dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins

  4. Engineering Task Plan for simulated riser installation by use of rotary drilling

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-12-01

    This task is being performed to demonstrate the feasibility of the best riser installation alternative identified in the Engineering Study. This Engineering Task Plan (ETP) will be the WHC project management plan for the riser installation demonstration activities

  5. A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated

    Science.gov (United States)

    Liu, Shang; Shi, Dongyan; Zhang, Ying

    Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.

  6. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  7. Engineering and planning for decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Gans, G.M. Jr.

    1982-01-01

    With the publication of NUREG-0586, ''Draft Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities'' in January, 1981 the Nuclear Regulatory Commission staff has put the industry on notice that the termination of operating licenses and the final disposal of physical facilities will require the early consideration of several options and approaches and the preparation of comprehensive engineering and planning documents for the selected option at the end of useful life. This paper opens with a discussion of the options available and the principal aspects of decommissioning. The major emphasis of the composition is the nature of documents, the general approach to be followed, and special considerations to be taken into account when performing the detailed engineering and planning for decommissioning, as the end of life approaches and actual physical disposal is imminent. The author's main point of reference is on-going work by Burns and Roe, with Nuclear Energy Services, under contract to the Department of Energy's Richland Office, to perform the engineering and planning for the decommissioning of the Shippingport Atomic Power Station in Pennsylvania

  8. Preliminary Neutronics Design Studies for a Molten Salt Blanket LIFE Engine

    International Nuclear Information System (INIS)

    Powers, J.

    2008-01-01

    The Laser Inertial Confinement Fusion Fission Energy (LIFE) Program being developed at Lawrence Livermore National Laboratory (LLNL) aims to design a hybrid fission-fusion subcritical nuclear engine that uses a laser-driven Inertial Confinement Fusion (ICF) system to drive a subcritical fission blanket. This combined fusion-fission hybrid system could be used for generating electricity, material transmutation or incineration, or other applications. LIFE does not require enriched fuel since it is a sub-critical system and LIFE can sustain power operation beyond the burnup levels at which typical fission reactors need to be refueled. In light of these factors, numerous options have been suggested and are being investigated. Options being investigated include fueling LIFE engines with spent nuclear fuel to aid in disposal/incineration of commercial spent nuclear fuel or using depleted uranium or thorium fueled options to enhance proliferation resistance and utilize non-fissile materials (1]. LIFE engine blanket designs using a molten salt fuel system represent one area of investigation. Possible applications of a LIFE engine with a molten salt blanket include uses as a spent nuclear fuel burner, fissile fuel breeding platform, and providing a backup alternative to other LIFE engine blanket designs using TRISO fuel particles in case the TRISO particles are found to be unable to withstand the irradiation they will be subjected to. These molten salts consist of a mixture of LiF with UF 4 or ThF 4 or some combination thereof. Future systems could look at using PuF 3 or PuF 4 as well, though no work on such system with initial plutonium loadings has been performed for studies documented in this report. The purpose of this report is to document preliminary neutronics design studies performed to support the development of a molten salt blanket LIFE engine option, as part of the LIFE Program being performed at Lawrence Livermore National laboratory. Preliminary design studies

  9. Preliminary Neutronics Design Studies for a Molten Salt Blanket LIFE Engine

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J

    2008-10-23

    The Laser Inertial Confinement Fusion Fission Energy (LIFE) Program being developed at Lawrence Livermore National Laboratory (LLNL) aims to design a hybrid fission-fusion subcritical nuclear engine that uses a laser-driven Inertial Confinement Fusion (ICF) system to drive a subcritical fission blanket. This combined fusion-fission hybrid system could be used for generating electricity, material transmutation or incineration, or other applications. LIFE does not require enriched fuel since it is a sub-critical system and LIFE can sustain power operation beyond the burnup levels at which typical fission reactors need to be refueled. In light of these factors, numerous options have been suggested and are being investigated. Options being investigated include fueling LIFE engines with spent nuclear fuel to aid in disposal/incineration of commercial spent nuclear fuel or using depleted uranium or thorium fueled options to enhance proliferation resistance and utilize non-fissile materials [1]. LIFE engine blanket designs using a molten salt fuel system represent one area of investigation. Possible applications of a LIFE engine with a molten salt blanket include uses as a spent nuclear fuel burner, fissile fuel breeding platform, and providing a backup alternative to other LIFE engine blanket designs using TRISO fuel particles in case the TRISO particles are found to be unable to withstand the irradiation they will be subjected to. These molten salts consist of a mixture of LiF with UF{sub 4} or ThF{sub 4} or some combination thereof. Future systems could look at using PuF{sub 3} or PuF{sub 4} as well, though no work on such system with initial plutonium loadings has been performed for studies documented in this report. The purpose of this report is to document preliminary neutronics design studies performed to support the development of a molten salt blanket LIFE engine option, as part of the LIFE Program being performed at Lawrence Livermore National laboratory

  10. Tank farm instrumentation and data acquisition/management upgrade plan

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment

  11. Personal Study Planning in Doctoral Education in Industrial Engineering

    Science.gov (United States)

    Lahenius, K.; Martinsuo, M.

    2010-01-01

    The duration of doctoral studies has increased in Europe. Personal study planning has been considered as one possible solution to help students in achieving shorter study times. This study investigates how doctoral students experience and use personal study plans in one university department of industrial engineering. The research material…

  12. Analysis of Air Force Civil Engineering Strategic Planning

    National Research Council Canada - National Science Library

    Mondo, Francis

    2003-01-01

    Several organizations within the Department of Defense, including the Air Force Civil Engineer, are actively engaged in strategic planning in an effort to create a roadmap for future capabilities and performance...

  13. Tank waste remediation system systems engineering management plan

    International Nuclear Information System (INIS)

    Peck, L.G.

    1998-01-01

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance

  14. Preliminary plan for decommissioning - repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    Hallberg, Bengt; Tiberg, Liselotte

    2010-06-01

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable for the

  15. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... publish a preliminary plan in the odd numbered years and a final plan in the even numbered years. The... necessary before concluding the review of the three remaining point source categories: Pulp, Paper and... standards for the 2012 reviews. These methodologies included: Identifying pass-through pollutants in sewage...

  16. Corporate Data Network (CDN). Data Requirements Task. Preliminary Strategic Data Plan. Volume 4

    International Nuclear Information System (INIS)

    1985-11-01

    The NRC has initiated a multi-year program to centralize its information processing in a Corporate Data Network (CDN). The new information processing environment will include shared databases, telecommunications, office automation tools, and state-of-the-art software. Touche Ross and Company was contracted with to perform a general data requirements analysis for shared databases and to develop a preliminary plan for implementation of the CDN concept. The Enterprise Model (Vol. 1) provided the NRC with agency-wide information requirements in the form of data entities and organizational demand patterns as the basis for clustering the entities into logical groups. The Data Dictionary (Vol.2) provided the NRC with definitions and example attributes and properties for each entity. The Data Model (Vol.3) defined logical databases and entity relationships within and between databases. The Preliminary Strategic Data Plan (Vol. 4) prioritized the development of databases and included a workplan and approach for implementation of the shared database component of the Corporate Data Network

  17. Business planning for scientists and engineers[3rd edition]; TOPICAL

    International Nuclear Information System (INIS)

    Servo, Jenny C.

    1999-01-01

    This combination text/workbook is intended for use by scientists or engineers actively engaged in developing a product or technology to commercial production. The 'how' of planning is a central theme with special emphasis on development of operational plans and strategic thinking

  18. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  19. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  20. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  1. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  2. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  3. SECONDARY WASTE/ETF (EFFLUENT TREATMENT FACILITY) PRELIMINARY PRE-CONCEPTUAL ENGINEERING STUDY

    International Nuclear Information System (INIS)

    May, T.H.; Gehner, P.D.; Stegen, Gary; Hymas, Jay; Pajunen, A.L.; Sexton, Rich; Ramsey, Amy

    2009-01-01

    This pre-conceptual engineering study is intended to assist in supporting the critical decision (CD) 0 milestone by providing a basis for the justification of mission need (JMN) for the handling and disposal of liquid effluents. The ETF baseline strategy, to accommodate (WTP) requirements, calls for a solidification treatment unit (STU) to be added to the ETF to provide the needed additional processing capability. This STU is to process the ETF evaporator concentrate into a cement-based waste form. The cementitious waste will be cast into blocks for curing, storage, and disposal. Tis pre-conceptual engineering study explores this baseline strategy, in addition to other potential alternatives, for meeting the ETF future mission needs. Within each reviewed case study, a technical and facility description is outlined, along with a preliminary cost analysis and the associated risks and benefits.

  4. Notification: Evaluation of Office of Pesticide Programs’ Genetically Engineered Corn Insect Resistance Management

    Science.gov (United States)

    Project #OPE-FY15-0055, July 09, 2015. The EPA OIG plans to begin preliminary research on the EPA's ability to manage and prevent increased insect resistance to genetically engineered Bacillus thuringiensis (Bt) corn.

  5. Business plan: A preliminary approach to an unknown genre

    Directory of Open Access Journals (Sweden)

    Federico Navarro

    2015-11-01

    Full Text Available The business plan has been widely included in the curricula of economics degrees and is key to business practice worldwide, but has not been studied from a socio-discursive perspective yet due to restrictions in its social, spatial, and temporal circulation. Based on interviews and a qualitative analysis of a corpus of 38 texts written in Spanish, I aim to provide a preliminary description of the genre. Results indicate that a chain of four phases is associated to a continuum of social settings organized through entrepreneurial/corporate and expert/training variables; its rhetorical structure includes “describing present/potential situation of the company and market” and “describing future processes of strategic actions regarding the marketing, production, and financial plans”. This analysis offers methodological innovations to account for occluded genres, encourages the contrastive study of the business plan in different cultural and linguistic environments, and assists business teachers with a situated picture of the genre

  6. Technology for reducing aircraft engine pollution

    Science.gov (United States)

    Rudey, R. A.; Kempke, E. E., Jr.

    1975-01-01

    Programs have been initiated by NASA to develop and demonstrate advanced technology for reducing aircraft gas turbine and piston engine pollutant emissions. These programs encompass engines currently in use for a wide variety of aircraft from widebody-jets to general aviation. Emission goals for these programs are consistent with the established EPA standards. Full-scale engine demonstrations of the most promising pollutant reduction techniques are planned within the next three years. Preliminary tests of advanced technology gas turbine engine combustors indicate that significant reductions in all major pollutant emissions should be attainable in present generation aircraft engines without adverse effects on fuel consumption. Fundamental-type programs are yielding results which indicate that future generation gas turbine aircraft engines may be able to utilize extremely low pollutant emission combustion systems.

  7. Solar Central Receiver Prototype Heliostat. Volume II. Phase II planning (preliminary)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    A currently planned DOE program will develop and construct a 10 MW/sub e/ Pilot Plant to demonstrate the feasibility and operational characteristics of Solar Central Receiver Power Generation. The field of heliostats is a major element of the Solar Central Receiver Power Generation system. The primary objective of the program described is to establish and verify the manufacturability, performance, durability, and maintenance requirements of the commercial plant heliostat design. End products of the 16 month effort include: (1) design, fabrication, and test of heliostats; (2) preliminary designs of manufacturing, assembly, installation, and maintenance processes for quantity production; (3) detailed design of critical tooling or other special equipment for such processes; (4) refined cost estimates for heliostats and maintenance; and (5) an updated commercial plant heliostat preliminary design. The program management and control system is discussed. (WHK)

  8. Prediction of the Main Engine Power of a New Container Ship at the Preliminary Design Stage

    Science.gov (United States)

    Cepowski, Tomasz

    2017-06-01

    The paper presents mathematical relationships that allow us to forecast the estimated main engine power of new container ships, based on data concerning vessels built in 2005-2015. The presented approximations allow us to estimate the engine power based on the length between perpendiculars and the number of containers the ship will carry. The approximations were developed using simple linear regression and multivariate linear regression analysis. The presented relations have practical application for estimation of container ship engine power needed in preliminary parametric design of the ship. It follows from the above that the use of multiple linear regression to predict the main engine power of a container ship brings more accurate solutions than simple linear regression.

  9. Idaho National Engineering Laboratory Conceptual Site Treatment Plan. Tables 8.1 and 8.2, Appendices A, B, C

    International Nuclear Information System (INIS)

    Eaton, D.

    1993-10-01

    The US Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The FFCAct requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the host state or the US Environmental Protection Agency (EPA) for either approval, approval with modification, or disapproval. The Idaho National Engineering Laboratory (INEL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the FFCAct and is being provided to the State of Idaho, the EPA, and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix A of this document. In addition to aiding the INEL in formulating its Final Proposed STP, this CSTP will also provide information to other DOE sites for use in identifying common technology needs and potential options for treating their wastes. The INEL CSTP is also intended to be used in conjunction with CSTPs from other sites as a basis for nationwide discussions among state regulators, the EPA, and other interested parties on treatment strategies and options, and on technical and equity issues associated with DOE's mixed waste

  10. Idaho National Engineering Laboratory Conceptual Site Treatment Plan. Tables 8.1 and 8.2, Appendices A, B, C

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, D.

    1993-10-01

    The US Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The FFCAct requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the host state or the US Environmental Protection Agency (EPA) for either approval, approval with modification, or disapproval. The Idaho National Engineering Laboratory (INEL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the FFCAct and is being provided to the State of Idaho, the EPA, and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix A of this document. In addition to aiding the INEL in formulating its Final Proposed STP, this CSTP will also provide information to other DOE sites for use in identifying common technology needs and potential options for treating their wastes. The INEL CSTP is also intended to be used in conjunction with CSTPs from other sites as a basis for nationwide discussions among state regulators, the EPA, and other interested parties on treatment strategies and options, and on technical and equity issues associated with DOE`s mixed waste.

  11. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  12. A Preliminary Version of Heavy Ion Treatment Planning System at IMP

    International Nuclear Information System (INIS)

    Liu Xinguo; Dai Zhongying; Ye Fei; Wu Qingfeng; Li Ping; Li Qiang; Jin Xiaodong; Du Xiaogang; WangYangping; Dang Jianwu

    2010-01-01

    Based on the Heavy Ion Research Facility in Lanzhou (HIRFL/HIRFL-CSR), clinical trials of heavy ion radiotherapy are being conducted at the Institute of Modern Physics (IMP), Chinese Academy of Sciences, where two-dimensional(2D) layer-stacking conformal irradiation method in a passive beam delivery system was applied. To make better use of the biophysical advantages of heavy ion beams and ensure success of the clinical trials, a preliminary version of heavy ion treatment planning system (TPS) has been developed at IMP. The TPS was designed in a manner to adapt to the 2D layer-stacking conformal irradiation method. The architecture and function of the TPS software and the implementation of dose calculation algorithm in the TPS were introduced in this paper.The deviation between the doses planned by the TPS and measured through an anthropomorphous phantom was verified to be less than 5%. Finally,the pending issues for developing a sophisticated treatment planning system at IMP were discussed. (authors)

  13. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  14. Repository Subsurface Preliminary Fire Hazard Analysis

    International Nuclear Information System (INIS)

    Logan, Richard C.

    2001-01-01

    This fire hazard analysis identifies preliminary design and operations features, fire, and explosion hazards, and provides a reasonable basis to establish the design requirements of fire protection systems during development and emplacement phases of the subsurface repository. This document follows the Technical Work Plan (TWP) (CRWMS M and O 2001c) which was prepared in accordance with AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities''; Attachment 4 of AP-ESH-008, ''Hazards Analysis System''; and AP-3.11Q, ''Technical Reports''. The objective of this report is to establish the requirements that provide for facility nuclear safety and a proper level of personnel safety and property protection from the effects of fire and the adverse effects of fire-extinguishing agents

  15. The Theory of Planned Behaviour Applied to Search Engines as a Learning Tool

    Science.gov (United States)

    Liaw, Shu-Sheng

    2004-01-01

    Search engines have been developed for helping learners to seek online information. Based on theory of planned behaviour approach, this research intends to investigate the behaviour of using search engines as a learning tool. After factor analysis, the results suggest that perceived satisfaction of search engine, search engines as an information…

  16. Preliminary inspection of secondary cooling system piping for maintenance plan in JMTR

    International Nuclear Information System (INIS)

    Hanakawa, Hiroki; Hanawa, Yoshio; Izumo, Hironobu; Fukasaku, Akitomi; Nagao, Yoshiharu; Miyazawa, Masataka; Niimi, Motoji

    2008-01-01

    The JMTR is under the refurbishment and will start on FY 2011. The JMTR will operate for about 20 years from 2011. Before this JMTR operation, preliminary inspection of secondary cooling system piping was carried out in order to make a maintenance plan. As the results of this inspection, it was confirmed that the corrosion was reached by piping ingot, or decrease of piping thickness could hardly be observed. Therefore, it was confirmed that the strength or the functionality of the piping had been maintained by usual operation and maintenance. According to the results of this inspection, the basic date for maintenances are confirmed and it is clear to be able to make the maintenances plan in future. (author)

  17. The preliminary planning for decommissioning nuclear facilities in Taiwan

    International Nuclear Information System (INIS)

    Li, K.K.

    1993-01-01

    During the congressional hearing in 1992 for a $7 billion project for approval of the fourth nuclear power plant, the public was concerned about the decommissioning of the operating plants. In order to facilitate the public acceptance of nuclear energy and to secure the local capability for appropriate nuclear backend management, both technologically and financially, it is important to have preliminary planning for decommissioning the nuclear facilities. This paper attempted to investigate the possible scope of decommissioning activities and addressed the important regulatory, financial, and technological aspects. More research and development works regarding the issue of decommissioning are needed to carry out the government's will of decent management of nuclear energy from the cradle to the grave

  18. Formulating a preliminary business plan for a business consultancy company : case: CreaNets Business Development and Consultancy

    OpenAIRE

    Korkmaz, Gökhan

    2015-01-01

    The main purpose of this research is to formulate a preliminary business plan for a business consultancy which will operate between Finland and Turkey and be headquartered in Finland. The research focuses on practical information on entrepreneurship, business planning and business models as well as starting up a new business in Finland. During the theoretical framework, information is provided on entrepreneurship and business planning. Hoffren’s Dynamic Business Model and Osterwalder’s Bu...

  19. Engineering task plan for steam line ramp calculations

    International Nuclear Information System (INIS)

    DeSantis, G.N.; Freeman, R.D.

    1994-01-01

    The purpose of this document is to provide an approved work plan to perform calculations that verify the load limits of a proposed ramp over a steam line at the back side (East side) of SY Farm in support of work package 2W-94-00812/K. The objective of this supporting document is to provide Operations with a set of checked calculations that verify the ramp over the steam line at SY Farm will support a fully loaded concrete mixer truck without affecting the steam line. The calculations will be performed by an engineers from Facility Systems and independently checked and reviewed by another engineer. The calculations may then be added to the work package. If Operations decides to make any configuration changes to the steam line or surrounding area, Operations shall have these changes documented by an Engineering Change Notice (ECN). This ECN can be done by Facility Systems or any other engineering organization at the direction of Operations

  20. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  1. Master planning for successful safeguard/security systems engineering

    International Nuclear Information System (INIS)

    Bruckner, D.G.

    1987-01-01

    The development and phased implementation of an overall master plan for weapons systems and facilities engaged in the complexities of high technology provides a logical road map for system accomplishment. An essential factor in such a comprehensive plan is development of an integrated systems security engineering plan. Some DOD programs use new military regulations and policy directives to mandate consideration of the safeguard/security disciplines be considered for weapons systems and facilities during the entire life cycle of the program. The emphasis is to make certain the weapon system and applicable facilities have complementary security features. Together they must meet the needs of the operational mission and, at the same time, provide the security forces practical solutions to their requirements. This paper discusses the process of meshing the safe- guards/security requirements with an overall the master plan and the challenges attendant to this activity

  2. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  3. Center Planning and Development Student Engineer

    Science.gov (United States)

    Jenkins, Kenneth T.

    2013-01-01

    This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

  4. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project

  5. Hydrogen Gas Retention and Release from WTP Vessels: Summary of Preliminary Studies

    Energy Technology Data Exchange (ETDEWEB)

    Gauglitz, Phillip A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bontha, Jagannadha R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Daniel, Richard C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mahoney, Lenna A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rassat, Scot D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wells, Beric E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bao, Jie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Boeringa, Gregory K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Buchmiller, William C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burns, Carolyn A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chun, Jaehun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Karri, Naveen K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Huidong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tran, Diana N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-07-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release from Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design

  6. Space Transportation Engine Program (STEP), phase B

    Science.gov (United States)

    1990-01-01

    The Space Transportation Engine Program (STEP) Phase 2 effort includes preliminary design and activities plan preparation that will allow smooth and time transition into a Prototype Phase and then into Phases 3, 4, and 5. A Concurrent Engineering approach using Total Quality Management (TQM) techniques, is being applied to define an oxygen-hydrogen engine. The baseline from Phase 1/1' studies was used as a point of departure for trade studies and analyses. Existing STME system models are being enhanced as more detailed module/component characteristics are determined. Preliminary designs for the open expander, closed expander, and gas generator cycles were prepared, and recommendations for cycle selection made at the Design Concept Review (DCR). As a result of July '90 DCR, and information subsequently supplied to the Technical Review Team, a gas generator cycle was selected. Results of the various Advanced Development Programs (ADP's) for the Advanced Launch Systems (ALS) were contributive to this effort. An active vehicle integration effort is supplying the NASA, Air Force, and vehicle contractors with engine parameters and data, and flowing down appropriate vehicle requirements. Engine design and analysis trade studies are being documented in a data base that was developed and is being used to organize information. To date, seventy four trade studies were input to the data base.

  7. The Preliminary Decommissioning Plan of the Dalat Nuclear Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lam, Pham Van; Vien, Luong Ba; Vinh, Le Vinh; Nghiem, Huynh Ton; Tuan, Nguyen Minh; Phuong, Pham Hoai [Nuclear Research Institute, Da Lat (Viet Nam)

    2013-08-15

    Recently, after 25 years of operation, a preliminary decommissioning plan for the Dalat Nuclear Research Reactor (DNRR) has been produced but as yet it has not been implemented due to the continued operations of the reactor. However, from the early phases of facility design and construction and during operation, the aspects that facilitate decommissioning process have been considered. This paper outlines the DNRR general description, the organization that manages the facility, the decommissioning strategy and associated project management, and the expected decommissioning activities. The paper also considers associated cost and funding, safety and environmental issues and waste management aspects amongst other considerations associated with decommissioning a nuclear research reactor. (author)

  8. Preliminary systems engineering evaluations for the National Ecological Observatory Network.

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, Perry J.; Kottenstette, Richard Joseph; Crouch, Shannon M.; Brocato, Robert Wesley; Zak, Bernard Daniel; Osborn, Thor D.; Ivey, Mark D.; Gass, Karl Leslie; Heller, Edwin J.; Dishman, James Larry; Schubert, William Kent; Zirzow, Jeffrey A.

    2008-11-01

    The National Ecological Observatory Network (NEON) is an ambitious National Science Foundation sponsored project intended to accumulate and disseminate ecologically informative sensor data from sites among 20 distinct biomes found within the United States and Puerto Rico over a period of at least 30 years. These data are expected to provide valuable insights into the ecological impacts of climate change, land-use change, and invasive species in these various biomes, and thereby provide a scientific foundation for the decisions of future national, regional, and local policy makers. NEON's objectives are of substantial national and international importance, yet they must be achieved with limited resources. Sandia National Laboratories was therefore contracted to examine four areas of significant systems engineering concern; specifically, alternatives to commercial electrical utility power for remote operations, approaches to data acquisition and local data handling, protocols for secure long-distance data transmission, and processes and procedures for the introduction of new instruments and continuous improvement of the sensor network. The results of these preliminary systems engineering evaluations are presented, with a series of recommendations intended to optimize the efficiency and probability of long-term success for the NEON enterprise.

  9. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  10. Possible people, complaints, and the distinction between genetic planning and genetic engineering.

    Science.gov (United States)

    Delaney, James J

    2011-07-01

    Advances in the understanding of genetics have led to the belief that it may become possible to use genetic engineering to manipulate the DNA of humans at the embryonic stage to produce certain desirable traits. Although this currently cannot be done on a large scale, many people nevertheless object in principle to such practices. Most often, they argue that genetic enhancements would harm the children who were engineered, cause societal harms, or that the risks of perfecting the procedures are too high to proceed. However, many of these same people do not have serious objections to what is called 'genetic planning' procedures (such as the selection of sperm donors with desirable traits) that essentially have the same ends. The author calls the view that genetic engineering enhancements are impermissible while genetic planning enhancements are permissible the 'popular view', and argues that the typical reasons people give for the popular view fail to distinguish the two practices. This paper provides a principle that can salvage the popular view, which stresses that offspring from genetic engineering practices have grounds for complaint because they are identical to the pre-enhanced embryo, whereas offspring who are the result of genetic planning have no such grounds.

  11. Development of a preliminary decommissioning plan of the reactor IPEN/MB-01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza; Carneiro, Alvaro Luiz Guimaraes

    2013-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend, through publications, guidelines for the conduct of activities both for decommissioning nuclear power plants and for research reactors, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors, having only a standard applied to decommissioning power plants which was published in November 2012. The Nuclear and Energy Research Institute (IPEN) has two research reactors one being the reactor IPEN/MB-01. The aim of this work is to develop a preliminary plan for decommissioning of nuclear reactor research, considering the technical documentation of the system (RAS-Safety Analysis Report), the existing rules of CNEN (National Nuclear Energy Commission), as well as regulatory instructions and recommendations of the IAEA. The preliminary decommissioning plan consists of the presentation of actions and steps required as well as the strategies to be adopted for the shutdown of the facility under the technical and administrative, seeking the safety, health workers and the general public, minimizing environmental impacts. (author)

  12. Sludge Treatment Project Engineered Container Retrieval And Transfer System Preliminary Design Hazard Analysis Supplement 1

    International Nuclear Information System (INIS)

    Franz, G.R.; Meichle, R.H.

    2011-01-01

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  13. Preliminary plan for decommissioning - repository for spent nuclear fuel; Preliminaer plan foer avveckling - slutfoervar foer anvaent kaernbraensle

    Energy Technology Data Exchange (ETDEWEB)

    Hallberg, Bengt; Tiberg, Liselotte (Studsvik Nuclear AB, Nykoeping (Sweden))

    2010-06-15

    The final disposal facility for spent nuclear fuel is part of the KBS-3 system, which also consists of a central facility for interim storage and encapsulation of the spent nuclear fuel and a transport system. The nuclear fuel repository will be a nuclear facility. Regulation SSMFS 2008:1 (Swedish Radiation Safety Authority's regulations on safety of nuclear facilities) requires that the licensee must have a current decommissioning plan throughout the facility lifecycle. Before the facility is constructed, a preliminary decommissioning plan should be reported to the Swedish Radiation Safety Authority. This document is a preliminary decommissioning plan, and submitted as an attachment to SKB's application for a license under the Nuclear Activities Act to construct, own and operate the facility. The final disposal facility for spent nuclear fuel consists of an above ground part and a below ground part and will be built near Forsmark and the final repository for radioactive operational waste, SFR. The parts above and below ground are connected by a ramp and several shafts, e.g. for ventilation. The below ground part consists of a central area, and several landfill sites. The latter form the repository area. The sealed below ground part constitutes the final repository. The decommissioning is taking place after the main operation has ended, that is, when all spent nuclear fuel has been deposited and the deposition tunnels have been backfilled and plugged. The decommissioning involves sealing of the remaining parts of the below ground part and demolition of above ground part. When decommissioning begins, there will be no contamination in the facility. The demolition is therefore performed as for a conventional plant. Demolition waste is sorted and recycled whenever possible or placed in landfill. Hazardous waste is managed in accordance with current regulations. A ground investigation is performed and is the basis for after-treatment of the site. The timetable

  14. Preliminary decommissioning plan of the reactor IPEN-MB01

    International Nuclear Information System (INIS)

    Vivas, Ary de Souza

    2014-01-01

    Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend a set of guidelines for the conduct of activities of nuclear facilities, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors. However, in March 2011 a study committee was formed with the main task facing the issues of decommissioning of nuclear installations in Brazil, culminating in Resolution 133 of November 8, 2012, a standard project that treat about the Decommissioning of nucleoelectric plants. O Instituto de Pesquisas Energeticas e Nucleares (IPEN) has two research reactors one being the reactor IPEN/MB-01. The purpose of this master dissertation is to develop a preliminary plan for decommissioning this research reactor, considering the technical documentation of the facility (RAS-Safety Analysis Report), the existing standards of CNEN (National Nuclear Energy Commission), as well as IAEA recommendations. In terms of procedures for decommissioning research reactors, this work was based on what is most modern in experiences, strategies and lessons learned performed and documented in IAEA publications covering techniques and technologies for decommissioning. Considering these technical knowledge and due to the peculiarities of the facility, was selected to immediate dismantling strategy, which corresponds to the start of decommissioning activities once the installation is switched off, dividing it into work sectors. As a resource for monitoring and project management of reactor decommissioning and maintenance of records, we developed a database using Microsoft Access 2007, which contain all the items and

  15. Preliminary experience with SpineEOS, a new software for 3D planning in AIS surgery.

    Science.gov (United States)

    Ferrero, Emmanuelle; Mazda, Keyvan; Simon, Anne-Laure; Ilharreborde, Brice

    2018-04-24

    Preoperative planning of scoliosis surgery is essential in the effective treatment of spine pathology. Thus, precontoured rods have been recently developed to avoid iatrogenic sagittal misalignment and rod breakage. Some specific issues exist in adolescent idiopathic scoliosis (AIS), such as a less distal lower instrumented level, a great variability in the location of inflection point (transition from lumbar lordosis to thoracic kyphosis), and sagittal correction is limited by both bone-implant interface. Since 2007, stereoradiographic imaging system is used and allows for 3D reconstructions. Therefore, a software was developed to perform preoperative 3D surgical planning and to provide rod's shape and length. The goal of this preliminary study was to assess the feasibility, reliability, and the clinical relevance of this new software. Retrospective study on 47 AIS patients operated with the same surgical technique: posteromedial translation through posterior approach with lumbar screws and thoracic sublaminar bands. Pre- and postoperatively, 3D reconstructions were performed on stereoradiographic images (EOS system, Paris, France) and compared. Then, the software was used to plan the surgical correction and determine rod's shape and length. Simulated spine and rods were compared to postoperative real 3D reconstructions. 3D reconstructions and planning were performed by an independent observer. 3D simulations were performed on the 47 patients. No difference was found between the simulated model and the postoperative 3D reconstructions in terms of sagittal parameters. Postoperatively, 21% of LL were not within reference values. Postoperative SVA was 20 mm anterior in 2/3 of the cases. Postoperative rods were significantly longer than precontoured rods planned with the software (mean 10 mm). Inflection points were different on the rods used and the planned rods (2.3 levels on average). In this preliminary study, the software based on 3D stereoradiography low

  16. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  17. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  18. Preliminary business plan: Plzen district heating system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  19. Institutional Plan, FY 1993--1998, Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-01-01

    This document presents the plans and goals of the Idaho National Engineering Laboratory for FY 1993--1998. Areas discussed in this document include: INEL strategic view; initiatives; scientific and technical programs; environmental, safety, and health management, technology transfer, science and math education, and community affairs; human resources; site and facilities; and resource projections

  20. Characteristics, finite element analysis, test description, and preliminary test results of the STM4-120 kinematic Stirling engine

    Science.gov (United States)

    Linker, K. L.; Rawlinson, K. S.; Smith, G.

    1991-10-01

    The Department of Energy's Solar Thermal Program has, as one of its program elements, the development and evaluation of conversion device technologies applicable to dish-electric systems. The primary research and development combines a conversion device (heat engine), solar receiver, and generator mounted at the focus of a parabolic dish concentrator. The Stirling-cycle heat engine was identified as the conversion device for dish-electric with the most potential for meeting the program's goals for efficiency, reliability, and installed cost. To advance the technology toward commercialization, Sandia National Laboratories has acquired a Stirling Thermal Motors, Inc. kinematic Stirling engine, STM4-120, for evaluation. The engine is being bench-tested at Sandia's Engine Test Facility and will be combined later with a solar receiver for on-sun evaluation. This report presents the engine characteristics, finite element analyses of critical engine components, test system layout, instrumentation, and preliminary performance results from the bench test.

  1. Center Planning and Development Student Engineer at KSC

    Science.gov (United States)

    Jenkins, Kenneth T., Jr.

    2015-01-01

    This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

  2. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  3. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  4. School Improvement Plans and Student Achievement: Preliminary Evidence from the Quality and Merit Project in Italy

    Science.gov (United States)

    Caputo, Andrea; Rastelli, Valentina

    2014-01-01

    This study provides preliminary evidence from an Italian in-service training program addressed to lower secondary school teachers which supports school improvement plans (SIPs). It aims at exploring the association between characteristics/contents of SIPs and student improvement in math achievement. Pre-post standardized tests and text analysis of…

  5. Quiet engine program flight engine design study

    Science.gov (United States)

    Klapproth, J. F.; Neitzel, R. E.; Seeley, C. T.

    1974-01-01

    The results are presented of a preliminary flight engine design study based on the Quiet Engine Program high-bypass, low-noise turbofan engines. Engine configurations, weight, noise characteristics, and performance over a range of flight conditions typical of a subsonic transport aircraft were considered. High and low tip speed engines in various acoustically treated nacelle configurations were included.

  6. Engineering Task Plan for Hepa Filter Differential Pressure (DP) Fan Interlock Upgrades

    International Nuclear Information System (INIS)

    SIMONS, S.R.

    2000-01-01

    This document provides a plan for installation of Differential Pressure (DP) fan interlocks on the primary ventilation systems in selected Tank Farm facilities. This plan contains the engineering tasks required for installation and is summarized by the Acceptance for Beneficial Use list. Individuals responsible for each task are identified and scheduled accordingly

  7. The Third Competition on Knowledge Engineering for Planning and Scheduling

    OpenAIRE

    Bartak, Roman; Fratini, Simone; McCluskey, Lee

    2010-01-01

    We report on the staging of the third competition on knowledge engineering for AI planning and scheduling systems, held during ICAPS-09 at Thessaloniki, Greece in September 2009. We give an overview of how the competition has developed since its first run in 2005, and its relationship with the AI planning field. This run of the competition focused on translators that when input with some formal description in an application-area-specific language, output solver-ready domain models. Despite a ...

  8. STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction

    Science.gov (United States)

    Capobianco, Brenda M.; Rupp, Madeline

    2014-01-01

    This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…

  9. Preliminary assessments the shortcut to remediation (category III-surplus facility assessments)

    International Nuclear Information System (INIS)

    Byars, L.L.

    1995-01-01

    This report presents the details of the preliminary assessments for the shortcut of decontamination of surplus nuclear facilities. Topics discussed include: environment, health and safety concerns; economic considerations; reduction of transition time; preliminary characterization reports; preliminary project plan; health and safety plan; quality assurance plan; surveillance and maintenance plan; and waste management plan

  10. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck bellows

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST)

  11. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  12. Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

    International Nuclear Information System (INIS)

    Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike; Daniska, Vladimir

    2013-01-01

    The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

  13. Idaho National Engineering Laboratory Conceptual Site Treatment Plan. Sections 1 through 8, Tables 2-1 through 6-1, Figures 1 and 2

    International Nuclear Information System (INIS)

    Eaton, D.

    1993-10-01

    The US Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The FFCAct requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the host state or the US Environmental Protection Agency (EPA) for either approval, approval with modification, or disapproval. The Idaho National Engineering Laboratory (INEL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the FFCAct and is being provided to the State of Idaho, the EPA, and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix A of this document. In addition to aiding the INEL in formulating its Final Proposed STP, this CSTP will also provide information to other DOE sites for use in identifying common technology needs and potential options for treating their wastes. The INEL CSTP is also intended to be used in conjunction with CSTPs from other sites as a basis for nationwide discussions among state regulators, the EPA, and other interested parties on treatment strategies and options, and on technical and equity issues associated with DOE's mixed waste

  14. Environmental Survey preliminary report, Idaho National Engineering Laboratory, Idaho Falls, Idaho and Component Development and Integration Facility, Butte, Montana

    International Nuclear Information System (INIS)

    1988-09-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations' carried on at the INEL and the CDIF, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S ampersand A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S ampersand A Plan will be executed by the Oak Ridge National Laboratory. When completed, the S ampersand A results will be incorporated into the INEL/CDIF Survey findings for inclusion into the Environmental Survey Summary Report. 90 refs., 95 figs., 77 tabs

  15. Environmental Survey preliminary report, Idaho National Engineering Laboratory, Idaho Falls, Idaho and Component Development and Integration Facility, Butte, Montana

    Energy Technology Data Exchange (ETDEWEB)

    1988-09-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations' carried on at the INEL and the CDIF, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S A) Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The S A Plan will be executed by the Oak Ridge National Laboratory. When completed, the S A results will be incorporated into the INEL/CDIF Survey findings for inclusion into the Environmental Survey Summary Report. 90 refs., 95 figs., 77 tabs.

  16. Preliminary investigation of airgap electrospun silk-fibroin-based structures for ligament analogue engineering.

    Science.gov (United States)

    Sell, S A; McClure, M J; Ayres, C E; Simpson, D G; Bowlin, G L

    2011-01-01

    The process of electrospinning has proven to be highly beneficial for use in a number of tissue-engineering applications due to its ease of use, flexibility and tailorable properties. There have been many publications on the creation of aligned fibrous structures created through various forms of electrospinning, most involving the use of a metal target rotating at high speeds. This work focuses on the use of a variation known as airgap electrospinning, which does not use a metal collecting target but rather a pair of grounded electrodes equidistant from the charged polymer solution to create highly aligned 3D structures. This study involved a preliminary investigation and comparison of traditionally and airgap electrospun silk-fibroin-based ligament constructs. Structures were characterized with SEM and alignment FFT, and underwent porosity, permeability, and mechanical anisotropy evaluation. Preliminary cell culture with human dermal fibroblasts was performed to determine the degree of cellular orientation and penetration. Results showed airgap electrospun structures to be anisotropic with significantly increased porosity and cellular penetration compared to their traditionally electrospun counterparts.

  17. A wood-waste fuelled, indirectly-fired gas turbine cogeneration plant for sawmill application. Phase 1. Preliminary engineering design and financial evaluation

    Energy Technology Data Exchange (ETDEWEB)

    1986-02-01

    Most sawmills generate more than enough wood waste to be potentially self-sufficient in both dry-kiln heat and electricity requirements. It is not generally economically viable to use conventional steam/electricty cogeneration systems at the sawmill scale of operation. As a result, Canadian sawmills are still large consumers of purchased fuels and electricity. The overall objective of this project was to develop a cost-effective wood waste-fired power generation and lumber drying system for sawmill applications. The system proposed and evaluated in this project is a wood waste-fuelled, indirectly-fired gas turbine cogeneration plant. Research, design, and development of the system has been planned to take place in a number of phases. Phase 1 consists of a preliminary engineering design and financial evaluation of the system, the subjects of this report. The results indicate that the proposed indirectly-fired gas turbine cogeneration system is both technically and financially feasible under a variety of conditions. 8 figs., 8 tabs.

  18. Borda application of selection planning scheduling method in dock engineering consultants in Central Sulawesi province Indonesia

    Directory of Open Access Journals (Sweden)

    Siti Fatimah

    2015-04-01

    Full Text Available The aim of this paper to find out the planning scheduling method that used in dock engineering consultants as a project supervisor dock. This research use qualitative approach to find the most preferred method by engineering consultants, this research was explorative that test and find out the most preferred method. This research showed that dock engineering consultants in Palu City, Central Sulawesi most preferred curve-s method than method such as CPM, PERT, PDM, and Bar Chart. This research can help further research to determine differences and similarities the project planning scheduling method and being basic for The New Dock Engineering Consultans. This research looking for the most preferred method with limited respondents dock engineering consultans in Palu City, Central Sulawesi.

  19. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double-Shell Tanks - FY 2001

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    2000-01-01

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities, plan for performance demonstration testing, and a plan for field activities. Also included are a Statement of Work for contractor performance and a protocol to be followed should tank flaws that exceed the acceptance criteria are found

  20. Los Alamos Experimental Engineering Waste Burial Facility: design considerations and preliminary experimental plan

    International Nuclear Information System (INIS)

    DePoorter, G.L.

    1981-01-01

    The Experimental Engineered Waste Burial Facility is a field test site where generic experiments can be performed on several scales to get the basic information necessary to understand the processes occurring in low-level waste disposal facilities. The experiments include hydrological, chemical, mechanical, and biological factors. In order to separate these various factors in the experiments and to extrapolate the experimental results to actual facilities, experiments will be performed on several different scales

  1. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  2. Suggestions and comments about preliminary plans of ABNT 20:04.002-001 standard 'Seismic actions for nuclear facilities project'

    International Nuclear Information System (INIS)

    Soares, W.A.

    1984-01-01

    This paper presents an analysis of preliminary plans of standard 'seismic actions for nuclear facilities project'. This document presents since seismic event characterization up to details of structural project of nuclear facilities construction. (C.M.)

  3. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  4. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  5. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan)

  6. A study on the development plan and preliminary design of proton accelerator for nuclear application

    Energy Technology Data Exchange (ETDEWEB)

    Eom, Tae Yoon; Choi, B H; Park, C K; Chung, K S. and others

    1997-11-01

    A study on the development plan and preliminary design for the realisation of high current proton accelerator to be used as an essential component for the R and D of accelerator-driven system (ADS) for energy production and transmutation of long-lived radionuclides. Various fields of application of the accelerator such as basic nuclear physics, material science, biology, high energy physics, medicine, etc. were also investigated. From the preliminary design study, 1 GeV (20 mA) - Linac is required for the purposed of transmutation and energy production. Specification of injector, RFQ, CCTL and SL was also suggested. For the case study, a duoplasmatron ion source was designed by KAERI and fabricated by a domestic manufacturer, and the performance was also tested. (author). 71 refs., 61 tabs., 131 figs

  7. Geotechnical information as an important element when planning and designing civil engineering work Bogotá

    OpenAIRE

    Denisse Cangrejo Aljure; Carlos Gustavo Infante

    2010-01-01

    The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...

  8. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  9. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  10. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  11. Test/QA plan for the verification testing of diesel exhaust catalysts, particulate filters and engine modification control technologies for highway and nonroad use diesel engines

    Science.gov (United States)

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  12. Geotechnical engineering considerations in the NRC's review of uranium mill tailings remedial action plans

    International Nuclear Information System (INIS)

    Gillen, D.M.

    1985-01-01

    To reduce potential health hazards associated with inactive uranium mill tailings sites, the Department of Energy (DOE) is presently investigating and implementing remedial actions at 24 sites in the Uranium Mill Tailings Remedial Action Program (UMTRAP). All remedial actions must be selected and performed with the concurrence of the Nuclear Regulatory Commission (NRC). This paper provides a discussion of geotechnical engineering considerations during the NRC's preconcurrence review of proposed remedial action plans. In order for the NRC staff to perform an adequate geotechnical engineering review, DOE documents must contain a presentation of the properties and stability of all in-situ and engineered soil and rock which may affect the ability of the remedial action plans to meet EPA standards for long-term stability and control. Site investigations, laboratory testing, and remedial action designs must be adequate in scope and technique to provide sufficient data for the NRC staff to independently evaluate static and dynamic stability, settlement, radon attenuation through the soil cover, durability of rock for erosion protection, and other geotechnical engineering factors

  13. Preliminary Axial Flow Turbine Design and Off-Design Performance Analysis Methods for Rotary Wing Aircraft Engines. Part 1; Validation

    Science.gov (United States)

    Chen, Shu-cheng, S.

    2009-01-01

    For the preliminary design and the off-design performance analysis of axial flow turbines, a pair of intermediate level-of-fidelity computer codes, TD2-2 (design; reference 1) and AXOD (off-design; reference 2), are being evaluated for use in turbine design and performance prediction of the modern high performance aircraft engines. TD2-2 employs a streamline curvature method for design, while AXOD approaches the flow analysis with an equal radius-height domain decomposition strategy. Both methods resolve only the flows in the annulus region while modeling the impact introduced by the blade rows. The mathematical formulations and derivations involved in both methods are documented in references 3, 4 for TD2-2) and in reference 5 (for AXOD). The focus of this paper is to discuss the fundamental issues of applicability and compatibility of the two codes as a pair of companion pieces, to perform preliminary design and off-design analysis for modern aircraft engine turbines. Two validation cases for the design and the off-design prediction using TD2-2 and AXOD conducted on two existing high efficiency turbines, developed and tested in the NASA/GE Energy Efficient Engine (GE-E3) Program, the High Pressure Turbine (HPT; two stages, air cooled) and the Low Pressure Turbine (LPT; five stages, un-cooled), are provided in support of the analysis and discussion presented in this paper.

  14. A Generative Computer Model for Preliminary Design of Mass Housing

    Directory of Open Access Journals (Sweden)

    Ahmet Emre DİNÇER

    2014-05-01

    Full Text Available Today, we live in what we call the “Information Age”, an age in which information technologies are constantly being renewed and developed. Out of this has emerged a new approach called “Computational Design” or “Digital Design”. In addition to significantly influencing all fields of engineering, this approach has come to play a similar role in all stages of the design process in the architectural field. In providing solutions for analytical problems in design such as cost estimate, circulation systems evaluation and environmental effects, which are similar to engineering problems, this approach is being used in the evaluation, representation and presentation of traditionally designed buildings. With developments in software and hardware technology, it has evolved as the studies based on design of architectural products and production implementations with digital tools used for preliminary design stages. This paper presents a digital model which may be used in the preliminary stage of mass housing design with Cellular Automata, one of generative design systems based on computational design approaches. This computational model, developed by scripts of 3Ds Max software, has been implemented on a site plan design of mass housing, floor plan organizations made by user preferences and facade designs. By using the developed computer model, many alternative housing types could be rapidly produced. The interactive design tool of this computational model allows the user to transfer dimensional and functional housing preferences by means of the interface prepared for model. The results of the study are discussed in the light of innovative architectural approaches.

  15. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    Energy Technology Data Exchange (ETDEWEB)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  16. CAREER PLANS OF GRADUATES OF A CANADIAN DENTAL SCHOOL: PRELIMINARY REPORT OF A 5-YEAR SURVEY.

    Science.gov (United States)

    Nassar, Usama; Fairbanks, Connor; Flores-Mir, Carlos; Kilistoff, Alan; Easton, Rick

    2016-07-01

    Comprehensive data on the characteristics and opinions of graduating dental students in Canada are lacking. Specifically, only minimal information is available on graduates' immediate career plans and factors that may influence their decisions regarding these plans. Our aim was to gather such data to allow better understanding of this issue and improve the design of future studies on this topic. The Career Development Committee at the school of dentistry, University of Alberta, designed a short survey to be administered to graduating students over 5 years to gain insight into their immediate career plans and opinions on career services at the school. Preliminary results from 2012-2014 are reported here. With a response rate of close to 90% (n = 99/111), the data reveal considerable differences in immediate career plans between the surveyed students and those in other schools in Canada and the United States. Of the students, 89% were planning to work in a general dental practice and only 9% were planning to enroll in advanced education, including general practice residency training. More research is needed to better understand the factors affecting career path decisions of students.

  17. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    International Nuclear Information System (INIS)

    JENSEN, C.E.

    2000-01-01

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered

  18. Engineering Task Plan for Water Supply for Spray Washers on the Support Trucks

    International Nuclear Information System (INIS)

    BOGER, R.M.

    2000-01-01

    This Engineering Task Plan (ETP) defines the task and deliverables associated with the design, fabrication and testing of an improved spray wash system for the Rotary Mode Core Sampling (RMCS) System Support Trucks

  19. A Plan for Revolutionary Change in Gas Turbine Engine Control System Architecture

    Science.gov (United States)

    Culley, Dennis E.

    2011-01-01

    The implementation of Distributed Engine Control technology on the gas turbine engine has been a vexing challenge for the controls community. A successful implementation requires the resolution of multiple technical issues in areas such as network communications, power distribution, and system integration, but especially in the area of high temperature electronics. Impeding the achievement has been the lack of a clearly articulated message about the importance of the distributed control technology to future turbine engine system goals and objectives. To resolve these issues and bring the technology to fruition has, and will continue to require, a broad coalition of resources from government, industry, and academia. This presentation will describe the broad challenges facing the next generation of advanced control systems and the plan which is being put into action to successfully implement the technology on the next generation of gas turbine engine systems.

  20. Understanding safety and production risks in rail engineering planning and protection.

    Science.gov (United States)

    Wilson, John R; Ryan, Brendan; Schock, Alex; Ferreira, Pedro; Smith, Stuart; Pitsopoulos, Julia

    2009-07-01

    Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of 'safety' and broad issues of 'production' or 'performance'. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain - rail systems engineering work.

  1. Program plan for US Department of Energy support for nuclear engineering education

    International Nuclear Information System (INIS)

    Perkins, L.

    1992-01-01

    This document describes the plan developed to address the growing concern for the continued deterioration of nuclear engineering education in the United States and its ability to meet the manpower demands for this Nation's work force requiring nuclear related talent in the foreseeable future

  2. 40 CFR Appendix A to Subpart G of... - Sampling Plans for Selective Enforcement Auditing of Marine Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Marine Engines A Appendix A to Subpart G of Part 91 Protection of Environment...-IGNITION ENGINES Selective Enforcement Auditing Regulations Pt. 91, Subpt. G, App. A Appendix A to Subpart G of Part 91—Sampling Plans for Selective Enforcement Auditing of Marine Engines Table 1—Sampling...

  3. Engineering Task Plan for the Integrity Assessment Examination of Double-Contained Receiver Tanks (DCRT), Catch Tanks and Ancillary facilities

    International Nuclear Information System (INIS)

    BECKER, D.L.

    2000-01-01

    This Engineering Task Plan (ETP) presents the integrity assessment examination of three DCRTs, seven catch tanks, and two ancillary facilities located in the 200 East and West Areas of the Hanford Site. The integrity assessment examinations, as described in this ETP, will provide the necessary information to enable the independently qualified registered professional engineer (IQRPE) to assess the condition and integrity of these facilities. The plan is consistent with the Double-Shell Tank Waste Transfer Facilities Integrity Assessment Plan

  4. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  5. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  6. Effects of the conditions imposed by the environment and by utilities on the design of process engineering plant

    Energy Technology Data Exchange (ETDEWEB)

    Bernecker, G

    1976-09-01

    Conditions of environment and utilities have a great influence on the investment and operation costs of process engineering plants. If these conditions are taken into consideration in preliminary process engineering, the considerable amount of time spent in planning subsequent modifications could be saved. This publication from the seminar held with the topic 'planning and construction of process engineering systems' by the VDI-Bildungswerk shows how to facilitate problems of waste products already 'in statu nascendi'. The second part which will be published in the next edition will summarize the possibilities and the determining restrictions in the use of the available media for heating and cooling. Both essays are extended presentations of a chapter from a book in preparation by the VDI with the same title as the seminar.

  7. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Nonroad Engines A Appendix A to Subpart F of Part 89 Protection of Environment... NONROAD COMPRESSION-IGNITION ENGINES Selective Enforcement Auditing Pt. 89, Subpt. F, App. A Appendix A to Subpart F of Part 89—Sampling Plans for Selective Enforcement Auditing of Nonroad Engines Table 1—Sampling...

  8. V&V Plan for FPGA-based ESF-CCS Using System Engineering Approach.

    Science.gov (United States)

    Maerani, Restu; Mayaka, Joyce; El Akrat, Mohamed; Cheon, Jung Jae

    2018-02-01

    Instrumentation and Control (I&C) systems play an important role in maintaining the safety of Nuclear Power Plant (NPP) operation. However, most current I&C safety systems are based on Programmable Logic Controller (PLC) hardware, which is difficult to verify and validate, and is susceptible to software common cause failure. Therefore, a plan for the replacement of the PLC-based safety systems, such as the Engineered Safety Feature - Component Control System (ESF-CCS), with Field Programmable Gate Arrays (FPGA) is needed. By using a systems engineering approach, which ensures traceability in every phase of the life cycle, from system requirements, design implementation to verification and validation, the system development is guaranteed to be in line with the regulatory requirements. The Verification process will ensure that the customer and stakeholder’s needs are satisfied in a high quality, trustworthy, cost efficient and schedule compliant manner throughout a system’s entire life cycle. The benefit of the V&V plan is to ensure that the FPGA based ESF-CCS is correctly built, and to ensure that the measurement of performance indicators has positive feedback that “do we do the right thing” during the re-engineering process of the FPGA based ESF-CCS.

  9. A preliminary census of engineering activities located in Sicily (Southern Italy) which may "potentially" induce seismicity

    Science.gov (United States)

    Aloisi, Marco; Briffa, Emanuela; Cannata, Andrea; Cannavò, Flavio; Gambino, Salvatore; Maiolino, Vincenza; Maugeri, Roberto; Palano, Mimmo; Privitera, Eugenio; Scaltrito, Antonio; Spampinato, Salvatore; Ursino, Andrea; Velardita, Rosanna

    2015-04-01

    The seismic events caused by human engineering activities are commonly termed as "triggered" and "induced". This class of earthquakes, though characterized by low-to-moderate magnitude, have significant social and economical implications since they occur close to the engineering activity responsible for triggering/inducing them and can be felt by the inhabitants living nearby, and may even produce damage. One of the first well-documented examples of induced seismicity was observed in 1932 in Algeria, when a shallow magnitude 3.0 earthquake occurred close to the Oued Fodda Dam. By the continuous global improvement of seismic monitoring networks, numerous other examples of human-induced earthquakes have been identified. Induced earthquakes occur at shallow depths and are related to a number of human activities, such as fluid injection under high pressure (e.g. waste-water disposal in deep wells, hydrofracturing activities in enhanced geothermal systems and oil recovery, shale-gas fracking, natural and CO2 gas storage), hydrocarbon exploitation, groundwater extraction, deep underground mining, large water impoundments and underground nuclear tests. In Italy, induced/triggered seismicity is suspected to have contributed to the disaster of the Vajont dam in 1963. Despite this suspected case and the presence in the Italian territory of a large amount of engineering activities "capable" of inducing seismicity, no extensive researches on this topic have been conducted to date. Hence, in order to improve knowledge and correctly assess the potential hazard at a specific location in the future, here we started a preliminary study on the entire range of engineering activities currently located in Sicily (Southern Italy) which may "potentially" induce seismicity. To this end, we performed: • a preliminary census of all engineering activities located in the study area by collecting all the useful information coming from available on-line catalogues; • a detailed compilation

  10. Preliminary Performance Data on Westinghouse Electronic Power Regulator Operating on J34-WE-32 Turbojet Engine in Altitude Wind Tunnel

    Science.gov (United States)

    Ketchum, James R.; Blivas, Darnold; Pack, George J.

    1950-01-01

    The behavior of the Westinghouse electronic power regulator operating on a J34-WE-32 turbojet engine was investigated in the NACA Lewis altitude wind tunnel at the request of the Bureau of Aeronautics, Department of the Navy. The object of the program was to determine the, steady-state stability and transient characteristics of the engine under control at various altitudes and ram pressure ratios, without afterburning. Recordings of the response of the following parameters to step changes in power lever position throughout the available operating range of the engine were obtained; ram pressure ratio, compressor-discharge pressure, exhaust-nozzle area, engine speed, turbine-outlet temperature, fuel-valve position, jet thrust, air flow, turbine-discharge pressure, fuel flow, throttle position, and boost-pump pressure. Representative preliminary data showing the actual time response of these variables are presented. These data are presented in the form of reproductions of oscillographic traces.

  11. Dry-run of site investigation planning using the manual for preliminary investigation in Japan

    International Nuclear Information System (INIS)

    Akamura, Shigeki; Miwa, Tadashi; Tanaka, Tatsuya; Shiratsuchi, Hiroshi; Horio, Atsushi

    2011-01-01

    A stepwise site selection process has been adopted for geological disposal of HLW in Japan. Literature surveys, followed by preliminary investigations (PI) and, finally, detailed investigations in underground facilities will be carried out in the successive selection stages. In the PI stage, surface-based investigations such as borehole surveys and geophysical prospecting will be implemented. In order to conduct the PI appropriately and efficiently within a restricted timeframe and budget, planning and management of PI are very important. NUMO therefore compiled existing knowledge and experience in the planning and managing of investigations in the form of manuals to be used to improve and maintain internal expertise. The first editions of the two manuals were prepared on the basis of experience overseas, and then they were revised by taking technological environment, laws and regulation in Japan into consideration. This paper introduces the procedure of PI planning using manual as well as the results of the dry-run, with the Yokosuka area as a hypothetical PI area, where the monstraction study is under way. Based on the dry-run, applicability of the manual is checked and, at the same time, further revisions are made to improve the content. (author)

  12. PRELIMINARY PROJECT PLAN FOR LANSCE INTEGRATED FLIGHT PATHS 11A, 11B, 12, and 13

    International Nuclear Information System (INIS)

    Bultman, D. H.; Weinacht, D.

    2000-01-01

    This Preliminary Project Plan Summarizes the Technical, Cost, and Schedule baselines for an integrated approach to developing several flight paths at the Manual Lujan Jr. Neutron Scattering Center at the Los Alamos Neutron Science Center. For example, the cost estimate is intended to serve only as a rough order of magnitude assessment of the cost that might be incurred as the flight paths are developed. Further refinement of the requirements and interfaces for each beamline will permit additional refinement and confidence in the accuracy of all three baselines (Technical, Cost, Schedule)

  13. 40 CFR Appendix A to Subpart F of... - Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines

    Science.gov (United States)

    2010-07-01

    ... Enforcement Auditing of Small Nonroad Engines A Appendix A to Subpart F of Part 90 Protection of Environment...-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Selective Enforcement Auditing Pt. 90, Subpt. F, App. A Appendix A to Subpart F of Part 90—Sampling Plans for Selective Enforcement Auditing of Small Nonroad Engines...

  14. A preliminary survey of the National Wetlands Inventory as mapped for the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Hampton, N.L.; Rope, R.C.; Glennon, J.M.; Moor, K.S.

    1995-02-01

    Approximately 135 areas within the boundaries of the Idaho National Engineering Laboratory (INEL) have been mapped as wetland habitat as part of the United States Fish and Wildlife Service (FWS) National Wetlands Inventory (NWI). A preliminary survey of these wetlands was conducted to examine their general characteristics and status, to provide an estimation of relative ecological importance, to identify additional information needed to complete ecological characterization of important INEL wetlands, and to identify high priority wetland areas on the INEL. The purpose of the survey was to provide information to support the preparation of the Environmental Restoration and Waste Management (ER ampersand WM) Environmental Impact Statement (EIS). Information characterizing general vegetation, hydrology, wildlife use, and archaeology was collected at 105 sample sites on the INEL. Sites representing NWI palustrine, lacustrine, and riverine wetlands (including manmade), and areas unmapped or unclassified by the NWI were included in the sample. The field information was used to develop a preliminary ranking of relative ecological importance for each wetland visited during this survey. Survey limitations are identified

  15. Preliminary study on the control of direct injection diesel engine for better fuel flexibility and emissions control. Pt. 3

    Energy Technology Data Exchange (ETDEWEB)

    Egnell, R.; Kassem, N.; Bohlin, T.

    1985-01-01

    This report summarizes the results of a preliminary study on turbocharged direct injection diesel engines. The objectives and scope of this study are: 1. To explore the potential of using electronic control systems based on dynamic models of the engine in order to reduce fuel consumption, while maintaining good driveability. 2. To analyze the transient response of a turbocharged diesel engine based on experimental data collected from one of SAAB-SCANIA's test cells. 3. To survey the hardware components that would satisfy the requirements of the electronic control systems mentioned above. Part III discusses the transient response measurements obtained from two sets of experiments conducted on a six-cylinder motor working under varying conditions of load and speed. The objective of the first set of experiments was to quantify the difference in ignition delay between the transient and steady state operating conditions. The second set of experiments were aimed to provide a basis on which the engine efficiency obtained under transient conditions can be compared to that obtained from a single-cylinder motor working under steady state conditions.

  16. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  17. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks Table 1—Sampling...

  18. 24 CFR 599.507 - Tax incentives utilization plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Tax incentives utilization plan....507 Tax incentives utilization plan. (a) Preliminary plan. Within six months of designation, the CoRA must prepare and submit to HUD a preliminary tax incentives utilization plan for achieving the State...

  19. General Mechanical Repair. Minor Automotive Maintenance, Small Engine [Repair, and] Welding: Curriculum Guide and Lesson Plans.

    Science.gov (United States)

    Hamlin, Larry

    This document contains a curriculum guide and lesson plans for a general mechanical repair course with three sections: minor automotive maintenance, small engine repair, and welding. The curriculum guide begins with a matrix that relates the lesson plans to essential elements of math, science, language arts, and social studies and to Texas…

  20. Preliminary siting activities for new waste handling facilities at the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.D.; Hoskinson, R.L.; Kingsford, C.O.; Ball, L.W.

    1994-09-01

    The Idaho Waste Processing Facility, the Mixed and Low-Level Waste Treatment Facility, and the Mixed and Low-Level Waste Disposal Facility are new waste treatment, storage, and disposal facilities that have been proposed at the Idaho National Engineering Laboratory (INEL). A prime consideration in planning for such facilities is the selection of a site. Since spring of 1992, waste management personnel at the INEL have been involved in activities directed to this end. These activities have resulted in the (a) identification of generic siting criteria, considered applicable to either treatment or disposal facilities for the purpose of preliminary site evaluations and comparisons, (b) selection of six candidate locations for siting,and (c) site-specific characterization of candidate sites relative to selected siting criteria. This report describes the information gathered in the above three categories for the six candidate sites. However, a single, preferred site has not yet been identified. Such a determination requires an overall, composite ranking of the candidate sites, which accounts for the fact that the sites under consideration have different advantages and disadvantages, that no single site is superior to all the others in all the siting criteria, and that the criteria should be assigned different weighing factors depending on whether a site is to host a treatment or a disposal facility. Stakeholder input should now be solicited to help guide the final selection. This input will include (a) siting issues not already identified in the siting, work to date, and (b) relative importances of the individual siting criteria. Final site selection will not be completed until stakeholder input (from the State of Idaho, regulatory agencies, the public, etc.) in the above areas has been obtained and a strategy has been developed to make a composite ranking of all candidate sites that accounts for all the siting criteria.

  1. Preliminary siting activities for new waste handling facilities at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Taylor, D.D.; Hoskinson, R.L.; Kingsford, C.O.; Ball, L.W.

    1994-09-01

    The Idaho Waste Processing Facility, the Mixed and Low-Level Waste Treatment Facility, and the Mixed and Low-Level Waste Disposal Facility are new waste treatment, storage, and disposal facilities that have been proposed at the Idaho National Engineering Laboratory (INEL). A prime consideration in planning for such facilities is the selection of a site. Since spring of 1992, waste management personnel at the INEL have been involved in activities directed to this end. These activities have resulted in the (a) identification of generic siting criteria, considered applicable to either treatment or disposal facilities for the purpose of preliminary site evaluations and comparisons, (b) selection of six candidate locations for siting,and (c) site-specific characterization of candidate sites relative to selected siting criteria. This report describes the information gathered in the above three categories for the six candidate sites. However, a single, preferred site has not yet been identified. Such a determination requires an overall, composite ranking of the candidate sites, which accounts for the fact that the sites under consideration have different advantages and disadvantages, that no single site is superior to all the others in all the siting criteria, and that the criteria should be assigned different weighing factors depending on whether a site is to host a treatment or a disposal facility. Stakeholder input should now be solicited to help guide the final selection. This input will include (a) siting issues not already identified in the siting, work to date, and (b) relative importances of the individual siting criteria. Final site selection will not be completed until stakeholder input (from the State of Idaho, regulatory agencies, the public, etc.) in the above areas has been obtained and a strategy has been developed to make a composite ranking of all candidate sites that accounts for all the siting criteria

  2. Software Engineering Improvement Plan

    Science.gov (United States)

    2006-01-01

    In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.

  3. Theory and Praxis in Community Based Language Development: preliminary findings from applications of the Guide for Planning the Future of Our Language

    OpenAIRE

    Eberhard David M.

    2017-01-01

    This study will provide a critique of preliminary results obtained from the application of the ‘Guide for Planning the Future of Our Language’ (Hanawalt, Varenkamp, Lahn, & Eberhard 2015) in minority speech communities. This recent methodological tool was developed to enable and empower minoritized language groups to do their own language planning and to control their own language development. The tool is based on a theoretical approach to community based language development known as the ‘Su...

  4. 32 CFR 644.30 - Preliminary real estate work.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Preliminary real estate work. 644.30 Section 644... PROPERTY REAL ESTATE HANDBOOK Project Planning Military (army and Air Force) and Other Federal Agencies § 644.30 Preliminary real estate work. (a) Preliminary real estate work is defined as that action taken...

  5. Preliminary engineering assessment of treatment alternatives for groundwater from the Hanford 200 Area 200-BP-5 plumes

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents the results of the Preliminary Engineering Assessment of Treatment Alternatives (PEATA), an engineering evaluation of potential treatment alternatives for groundwater extracted from the 200-BP-5 Area's 216-BY Cribs and 216-B-5 Reverse Well plumes. The primary objective of the PEATA was to identify treatment technologies that are worth further consideration (i.e., treatability testing or a more refined engineering evaluation). It will also provide a basis for evaluating the results of the treatability testing that is currently being conducted on the presumptive remedy of ion exchange with disposal of spent resin and will serve as a guide for selection of other technologies for additional testing. Because there are little data or past experience with groundwater similar to the BY-Crib and B-5 Reverse Well Plumes, treatment efficiencies cannot be predicted with certainty and rigorous treatment system designs and costs cannot be developed. This applies to all alternatives, including the presumptive remedy of ion exchange. The approach for this study was to develop conceptual designs and approximate costs for the treatment technologies that were most likely to be effective on the BY-Crib and B-5 Reverse Well groundwater

  6. Preliminary collection 891 of lectures/papers in symposium by Society of Automotive Engineers of Japan. Jidosha gijutsukai gakujutsu koenkai maezurishu 891

    Energy Technology Data Exchange (ETDEWEB)

    1989-05-29

    This preliminary collection collected lectures given and papers presented in the symposium by the Society of Automotive Engineers of Japan to be held in May, 1989. Totally 86 papers, together with two basic lectures, were presented therein. The categories comprise two basic lectures titled Future problems on CVT and automatic transmission and Advances of gasoline engine and measuring techniques, ten papers for the gasoline engine, covering the supercharger, air/fuel mixture, noise, bore deformation, etc., ten papers for the diesel engine, covering the exhaust gas, supercharger, methanol engine, etc., ten papers for the car body, covering the aerodynamical characteristics and movement of car body, movement analysis of motor bicycle, head lamp, painting, etc., ten papers for the car parts, ten papers for the fuel injection, ten papers for the engine parts, covering the piston, oil ring, cylinder, connecting rod, plug, rotary, car heater, etc., three papers for the car production, covering the line control, welding, production method, etc., seven papers for the car steering and stability, eight papers for the vibration and noise attenuation and three papers for the others. 370 refs., 857 figs., 100 tabs.

  7. Toward a Definition of the Engineering Method.

    Science.gov (United States)

    Koen, Billy V.

    1988-01-01

    Describes a preliminary definition of engineering method as well as a definition and examples of engineering heuristics. After discussing some alternative definitions of the engineering method, a simplified definition of the engineering method is suggested. (YP)

  8. A reliability as an independent variable (RAIV) methodology for optimizing test planning for liquid rocket engines

    Science.gov (United States)

    Strunz, Richard; Herrmann, Jeffrey W.

    2011-12-01

    The hot fire test strategy for liquid rocket engines has always been a concern of space industry and agency alike because no recognized standard exists. Previous hot fire test plans focused on the verification of performance requirements but did not explicitly include reliability as a dimensioning variable. The stakeholders are, however, concerned about a hot fire test strategy that balances reliability, schedule, and affordability. A multiple criteria test planning model is presented that provides a framework to optimize the hot fire test strategy with respect to stakeholder concerns. The Staged Combustion Rocket Engine Demonstrator, a program of the European Space Agency, is used as example to provide the quantitative answer to the claim that a reduced thrust scale demonstrator is cost beneficial for a subsequent flight engine development. Scalability aspects of major subsystems are considered in the prior information definition inside the Bayesian framework. The model is also applied to assess the impact of an increase of the demonstrated reliability level on schedule and affordability.

  9. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Leslie A. [DOE/NNSA

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  10. A preliminary study on radiation damage effect in ceramics composite materials as innovative basic research using the HTTR

    International Nuclear Information System (INIS)

    Ishihara, Masahiro; Baba, Shinichi; Aihara, Jun; Arai, T.; Hayashi, K.; Ishino, S.

    1999-01-01

    An innovative basic research concerning with the basic science and applied technology is planned using the High Temperature Engineering Test Reactor (HTTR), which provides the advantage of not only a high temperature irradiation field above 400degC but also a large irradiation space. The first irradiation experiment is to be performed in 2001. Many research themes with a wide variety of scientific and technological interests are proposed as the innovative basic research. For the purpose of demonstration of scientific feasibility and advantages in the HTTR irradiation, several research themes have been being conducted as the preliminary studies. In this paper the outline of the innovative basic research is described, and the preliminary study on the radiation damage mechanism of ceramic composite materials is presented. (author)

  11. Plutonium Immobilization Can Loading Preliminary Specifications

    Energy Technology Data Exchange (ETDEWEB)

    Kriikku, E.

    1998-11-25

    This report discusses the Plutonium Immobilization can loading preliminary equipment specifications and includes a process block diagram, process description, equipment list, preliminary equipment specifications, plan and elevation sketches, and some commercial catalogs. This report identifies loading pucks into cans and backfilling cans with helium as the top priority can loading development areas.

  12. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results

    International Nuclear Information System (INIS)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P.

    2004-01-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs

  13. Exoskeletal Engine Concept: Feasibility Studies for Medium and Small Thrust Engines

    Science.gov (United States)

    Halliwell, Ian

    2001-01-01

    The exoskeletal engine concept is one in which the shafts and disks are eliminated and are replaced by rotating casings that support the blades in spanwise compression. Omission of the shafts and disks leads to an open channel at the engine centerline. This has immense potential for reduced jet noise and for the accomodation of an alternative form of thruster for use in a combined cycle. The use of ceramic composite materials has the potential for significantly reduced weight as well as higher working temperatures without cooling air. The exoskeletal configuration is also a natural stepping-stone to complete counter-rotating turbomachinery. Ultimately this will lead to reductions in weight, length, parts count and improved efficiency. The feasibility studies are in three parts. Part I-Systems and Component Requirements addressed the mechanical aspects of components from a functionality perspective. This effort laid the groundwork for preliminary design studies. Although important, it is not felt to be particularly original, and has therefore not been included in the current overview. Part 2-Preliminary Design Studies turned to some of the cycle and performance issues inherent in an exoskeletal configuration and some initial attempts at preliminary design of turbomachinery were described. Twin-spoon and single-spool 25.800-lbf-thrust turbofans were used as reference vehicles in a mid-size commercial subsonic category in addition to a single-spool 5,000-lbf-thrust turbofan that represented a general aviation application. The exoskeletal engine, with its open centerline, has tremendous potential for noise suppression and some preliminary analysis was done which began to quantify the benefits. Part 3-Additional Preliminary Design Studies revisited the design of single-spool 25,800-lbf-thrust turbofan configurations, but in addition to the original FPR = 1.6 and BPR = 5.1 reference engine, two additional configurations used FPR = 2.4 and BPR = 3.0 and FPR = 3.2 and BPR

  14. Engineering Task Plan for a vapor treatment system on Tank 241-C-103

    International Nuclear Information System (INIS)

    Conrad, R.B.

    1995-01-01

    This Engineering Task Plan describes tasks and responsibilities for the design, fabrication, test, and installation of a vapor treatment system (mixing system) on Tank 241-C-103. The mixing system is to be installed downstream of the breather filter and will use a mixing blower to reduce the chemical concentrations to below allowable levels

  15. Strategic Plan | College of Engineering & Applied Science

    Science.gov (United States)

    Electrical Engineering Instructional Laboratories Student Resources Industrial & Manufacturing Engineering Industrial & Manufacturing Engineering Academic Programs Industrial & Manufacturing Engineering Major Industrial & Manufacturing Engineering Minor Industrial & Manufacturing Engineering

  16. Strategic Planning | College of Engineering & Applied Science

    Science.gov (United States)

    Electrical Engineering Instructional Laboratories Student Resources Industrial & Manufacturing Engineering Industrial & Manufacturing Engineering Academic Programs Industrial & Manufacturing Engineering Major Industrial & Manufacturing Engineering Minor Industrial & Manufacturing Engineering

  17. Field test facility for monitoring water/radionuclide transport through partially saturated geologic media: design, construction, and preliminary description. Appendix I. Engineering drawings

    International Nuclear Information System (INIS)

    Phillips, S.J.; Campbell, A.C.; Campbell, M.D.; Gee, G.W.; Hoober, H.H.; Schwarzmiller, K.O.

    1979-11-01

    The engineering plans for a test facility to monitor radionuclide transport in water through partially saturated geological media are included. Drawings for the experimental set-up excavation plan and details, lysimeter, pad, access caisson, and caisson details are presented

  18. Waste Receiving and Processing Facility, Module 1: Volume 5, Engineering studies

    International Nuclear Information System (INIS)

    1992-03-01

    The WRAP facility at Hanford will retrieve, process, certify transuranic, mixed, and low level radioactive wastes for disposal/either on-site or at the WIPP. The Conceptual Design Report for the Waste Receiving And Processing Facility, Module 1 (WRAP 1), established the technical benchmark. The UE ampersand C Engineering Proposal/Work Plan proposed twenty Evaluation/Optimization Engineering Studies to evaluate design alternatives and critically examine functional performance requirements prior to commencement of Preliminary Design. Of these twenty studies, one has been eliminated as unnecessary (The Use of Scintered Metal Filters) due mainly to the lack of National Standards and to the fact that standard HEPA type filters are totally adequate for WRAP application. This report presents an executive summary of the remaining nineteen studies

  19. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  20. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  1. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  2. WSSRAP [Weldon Spring Site Remedial Action Project] quarry preliminary engineering report

    International Nuclear Information System (INIS)

    1990-01-01

    The removal, transport, and temporary storage of radiologically and chemically contaminated bulk waste from the Weldon Spring Quarry will be accomplished by dividing the work into three subcontract packages. The major portion of the work will come under the bulk waste excavation package; construction of a temporary storage area (TSA) at the Weldon Spring Chemical Plant and of a haul road between the quarry and the TSA comprise the other two packages. Cost estimates to complete the removal range from $5 million to $9.4 million due to a high degree of uncertainty regarding both the productivity of the excavating equipment and the effectiveness of planned dewatering efforts. Quarry wastes will be substantially dewatered and the water treated before discharge. Waste will be excavated in three phases, using conventional construction equipment, with preliminary sorting of waste at the quarry before transport to the TSA. Special attention will be given to controlling the spread of contamination by careful monitoring and control of surface and groundwater drainage and of particulate and radiological contamination of the air. 6 refs., 21 figs., 8 tabs

  3. Implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Bullock, M.G.; Rodriguez, R.R.

    1987-05-01

    This document presents the current implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory. Information contained in this report was also included in several Department of Energy (DOE) planning documents for the Defense Transuranic Waste Program. This information can be found in the following DOE documents: Comprehensive Implementation Plan for the DOE Defense Buried TRU Waste Program; Defense Waste Management Plan for Buried Transuranic-Contaminated Waste, Transuranic-Contaminated Waste, Transuranic-Contaminated Soil, and Difficult-to-Certify Transuranic Waste; and Defense Special-Case Transuranic Waste Implementation Plan. 11 refs

  4. Fusion power by magnetic confinement: plans and the associated need for nuclear engineers

    International Nuclear Information System (INIS)

    Hirsch, R.L.; Beard, D.S.

    1975-01-01

    An essential ingredient in the fusion development plan will be the training of appropriate scientific and technical manpower. In examining the need for fusion-trained nuclear engineers, it is projected that an additional 120 to 250 engineers at the MS and PhD levels will be needed between now and 1980. To be most effective, these graduates must not only be trained in the ''classic'' physical, nuclear, mechanical, and electrical sciences, but they will need specialized training in fusion plasma physics and fusion materials science. To help develop the appropriate educational programs, close cooperation between U. S. Energy Research and Development Administration (ERDA) headquarters, ERDA laboratories, private industry, and the universities will be essential. An emerging need for a carefully structured ''fusion technology'' option in nuclear engineering departments is plainly evident and is already beginning to be developed at leading institutions

  5. In situ sampling cart development engineering task plan

    International Nuclear Information System (INIS)

    DeFord, D.K.

    1995-01-01

    This Engineering Task Plan (ETP) supports the development for facility use of the next generation in situ sampling system for characterization of tank vapors. In situ sampling refers to placing sample collection devices (primarily sorbent tubes) directly into the tank headspace, then drawing tank gases through the collection devices to obtain samples. The current in situ sampling system is functional but was not designed to provide the accurate flow measurement required by today's data quality objectives (DQOs) for vapor characterization. The new system will incorporate modern instrumentation to achieve much tighter control. The next generation system will be referred to in this ETP as the New In Situ System (NISS) or New System. The report describes the current sampling system and the modifications that are required for more accuracy

  6. Reliability criteria selection for integrated resource planning

    International Nuclear Information System (INIS)

    Ruiu, D.; Ye, C.; Billinton, R.; Lakhanpal, D.

    1993-01-01

    A study was conducted on the selection of a generating system reliability criterion that ensures a reasonable continuity of supply while minimizing the total costs to utility customers. The study was conducted using the Institute for Electronic and Electrical Engineers (IEEE) reliability test system as the study system. The study inputs and results for conditions and load forecast data, new supply resources data, demand-side management resource data, resource planning criterion, criterion value selection, supply side development, integrated resource development, and best criterion values, are tabulated and discussed. Preliminary conclusions are drawn as follows. In the case of integrated resource planning, the selection of the best value for a given type of reliability criterion can be done using methods similar to those used for supply side planning. The reliability criteria values previously used for supply side planning may not be economically justified when integrated resource planning is used. Utilities may have to revise and adopt new, and perhaps lower supply reliability criteria for integrated resource planning. More complex reliability criteria, such as energy related indices, which take into account the magnitude, frequency and duration of the expected interruptions are better adapted than the simpler capacity-based reliability criteria such as loss of load expectation. 7 refs., 5 figs., 10 tabs

  7. Resources to Support Faculty Writing Data Management Plans: Lessons Learned from an Engineering Pilot

    Directory of Open Access Journals (Sweden)

    Natsuko H. Nicholls

    2014-07-01

    Full Text Available Recent years have seen a growing emphasis on the need for improved management of research data. Academic libraries have begun to articulate the conceptual foundations, roles, and responsibilities involved in data management planning and implementation. This paper provides an overview of the Engineering data support pilot at the University of Michigan Library as part of developing new data services and infrastructure. Through this pilot project, a team of librarians had an opportunity to identify areas where the library can play a role in assisting researchers with data management, and has put forth proposals for immediate steps that the library can take in this regard. The paper summarizes key findings from a faculty survey and discusses lessons learned from an analysis of data management plans from accepted NSF proposals. A key feature of this Engineering pilot project was to ensure that these study results will provide a foundation for librarians to educate and assist researchers with managing their data throughout the research lifecycle.

  8. Engineering task plan for purged light system

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    A purged, closed circuit television system is currently used to video inside of waste tanks. The video is used to support inspection and assessment of the tank interiors, waste residues, and deployed hardware. The system is also used to facilitate deployment of new equipment. A new light source has been requested by Characterization Project Operations (CPO) for the video system. The current light used is mounted on the camera and provides 75 watts of light, which is insufficient for clear video. Other light sources currently in use on the Hanford site either can not be deployed in a 4-inch riser or do not meet the ignition source controls. The scope of this Engineering Task Plan is to address all activities associated with the specification and procurement of a light source for use with the existing CPO video equipment. The installation design change to tank farm facilities is not within the scope of this ETP

  9. Preliminary Results From a Heavily Instrumented Engine Ice Crystal Icing Test in a Ground Based Altitude Test Facility

    Science.gov (United States)

    Flegel, Ashlie B.; Oliver, Michael J.

    2016-01-01

    Preliminary results from the heavily instrumented ALF502R-5 engine test conducted in the NASA Glenn Research Center Propulsion Systems Laboratory are discussed. The effects of ice crystal icing on a full scale engine is examined and documented. This same model engine, serial number LF01, was used during the inaugural icing test in the Propulsion Systems Laboratory facility. The uncommanded reduction of thrust (rollback) events experienced by this engine in flight were simulated in the facility. Limited instrumentation was used to detect icing on the LF01 engine. Metal temperatures on the exit guide vanes and outer shroud and the load measurement were the only indicators of ice formation. The current study features a similar engine, serial number LF11, which is instrumented to characterize the cloud entering the engine, detect/characterize ice accretion, and visualize the ice accretion in the region of interest. Data were acquired at key LF01 test points and additional points that explored: icing threshold regions, low altitude, high altitude, spinner heat effects, and the influence of varying the facility and engine parameters. For each condition of interest, data were obtained from some selected variations of ice particle median volumetric diameter, total water content, fan speed, and ambient temperature. For several cases the NASA in-house engine icing risk assessment code was used to find conditions that would lead to a rollback event. This study further helped NASA develop necessary icing diagnostic instrumentation, expand the capabilities of the Propulsion Systems Laboratory, and generate a dataset that will be used to develop and validate in-house icing prediction and risk mitigation computational tools. The ice accretion on the outer shroud region was acquired by internal video cameras. The heavily instrumented engine showed good repeatability of icing responses when compared to the key LF01 test points and during day-to-day operation. Other noticeable

  10. TWRS privatization: Phase I monitoring well engineering study and decommissioning plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, B.A.

    1996-09-11

    This engineering study evaluates all well owners and users, the status or intended use of each well, regulatory programs, and any future well needs or special purpose use for wells within the TWRS Privatization Phase I demonstration area. Based on the evaluation, the study recommends retaining 11 of the 21 total wells within the demonstration area and decommissioning four wells prior to construction activities per the Well Decommissioning Plan (WHC-SD-EN-AP-161, Rev. 0, Appendix I). Six wells were previously decommissioned.

  11. Unified Engineering Software System

    Science.gov (United States)

    Purves, L. R.; Gordon, S.; Peltzman, A.; Dube, M.

    1989-01-01

    Collection of computer programs performs diverse functions in prototype engineering. NEXUS, NASA Engineering Extendible Unified Software system, is research set of computer programs designed to support full sequence of activities encountered in NASA engineering projects. Sequence spans preliminary design, design analysis, detailed design, manufacturing, assembly, and testing. Primarily addresses process of prototype engineering, task of getting single or small number of copies of product to work. Written in FORTRAN 77 and PROLOG.

  12. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    International Nuclear Information System (INIS)

    White, Maurice A.; Qiu Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's)

  13. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    Science.gov (United States)

    White, Maurice A.; Qiu, Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's). .

  14. Preliminary analysis of engineered barrieer performances in geological disposal of high level waste

    International Nuclear Information System (INIS)

    Ohe, Toshiaki; Maki, Yasuo; Tanaka, Hiroshi; Kawanishi, Motoi.

    1988-01-01

    This report represents preliminary results of safety analysis of a engineered barrier system in geological disposal of high level radioactive waste. Three well-known computer codes; ORIGEN 2, TRUMP, and SWIFT were used in the simulation. Main conceptual design of the repository was almost identical to that of SKB in Sweden and NAGRA in Switzerland; the engineered barrier conasists glass solidified waste, steel overpack, and compacted bentonite. Two different underground formations are considered; granite and neogene sedimentary rock, which are typically found in Japan. We first determined the repository configuration, particularly the space between disposal pitts. The ORIGEN 2 was used to estimate heat generation in the waste glass reprocessed at 4 years after removal from PWR. Then, temperature distribution was calculated by the TRUMP. The results of two or three dimensional calculation indicated that the pit interval should be kept more than 5 m in the case of granite formation at 500 m depth, according to the temperature criteria in the bentonite layer ( 90 Sr, 241 Am, 239 Pu, and 237 Np were chosen in one or two dimensional calculations. For both cases of steady release and instanteneous release, the maximum concentration in the pore water at the boundary between bentonite and surrounding rock had the following order; 237 Np> 239 Pu> 90 Sr> 241 Am. Sensitivity analysis showed that the order mainly due to the different adsorption characteristics of the nuclides in bentonite layer. (author)

  15. A Preliminary Assessment of Daily Weather Conditions in Nuclear Site for Development of Effective Emergency Plan

    International Nuclear Information System (INIS)

    Han, Seok Jung; Ahn, Kwang Il

    2012-01-01

    A radiological emergency preparedness for nuclear sites is recognized as an important measure against anticipated severe accidents with environmental releases of radioactive materials. While there are many individual means in the emergency preparedness for nuclear accidents, one of most important means is to make a decision of evacuation or shelter of the public residents with the emergency plan zone (EPZ) of a nuclear site. In order to prepare an effective strategy for the evacuation as a basis of the emergency preparedness, it may need the understanding of atmospheric dispersion characteristics of radiation releases to the environment, mainly depending upon the weather conditions of a radiation releases location, i.e., a nuclear site. As a preliminary study for the development of an effective emergency plan, the basic features of the weather conditions of a specific site were investigated. A main interest of this study is to identify whether or not the site weather conditions have specific features helpful for a decision making of evacuation of the public residents

  16. Virtual environment simulation as a tool to support evacuation planning

    International Nuclear Information System (INIS)

    Mol, Antonio C.; Grecco, Claudio H.S.; Santos, Isaac J.A.L.; Carvalho, Paulo V.R.; Jorge, Carlos A.F.; Sales, Douglas S.; Couto, Pedro M.; Botelho, Felipe M.; Bastos, Felipe R.

    2007-01-01

    This work is a preliminary study of the use of a free game-engine as a tool to build and to navigate in virtual environments, with a good degree of realism, for virtual simulations of evacuation from building and risk zones. To achieve this goal, some adjustments in the game engine have been implemented. A real building with four floors, consisting of some rooms with furniture and people, has been virtually implemented. Simulations of simple different evacuation scenarios have been performed, measuring the total time spent in each case. The measured times have been compared with their corresponding real evacuation times, measured in the real building. The first results have demonstrated that the virtual environment building with the free game engine is capable to reproduce the real situation with a satisfactory level. However, it is important to emphasize that such virtual simulations serve only as an aid in the planning of real evacuation simulations, and as such must never substitute the later. (author)

  17. SU-D-BRB-02: Combining a Commercial Autoplanning Engine with Database Dose Predictions to Further Improve Plan Quality

    Energy Technology Data Exchange (ETDEWEB)

    Robertson, SP; Moore, JA; Hui, X; Cheng, Z; McNutt, TR [Johns Hopkins University, Baltimore, MD (United States); DeWeese, TL; Tran, P; Quon, H [John Hopkins Hospital, Baltimore, MD (United States); Bzdusek, K [Philips, Fitchburg, WI (United States); Kumar, P [Philips India Limited, Bangalore, Karnataka (India)

    2016-06-15

    Purpose: Database dose predictions and a commercial autoplanning engine both improve treatment plan quality in different but complimentary ways. The combination of these planning techniques is hypothesized to further improve plan quality. Methods: Four treatment plans were generated for each of 10 head and neck (HN) and 10 prostate cancer patients, including Plan-A: traditional IMRT optimization using clinically relevant default objectives; Plan-B: traditional IMRT optimization using database dose predictions; Plan-C: autoplanning using default objectives; and Plan-D: autoplanning using database dose predictions. One optimization was used for each planning method. Dose distributions were normalized to 95% of the planning target volume (prostate: 8000 cGy; HN: 7000 cGy). Objectives used in plan optimization and analysis were the larynx (25%, 50%, 90%), left and right parotid glands (50%, 85%), spinal cord (0%, 50%), rectum and bladder (0%, 20%, 50%, 80%), and left and right femoral heads (0%, 70%). Results: All objectives except larynx 25% and 50% resulted in statistically significant differences between plans (Friedman’s χ{sup 2} ≥ 11.2; p ≤ 0.011). Maximum dose to the rectum (Plans A-D: 8328, 8395, 8489, 8537 cGy) and bladder (Plans A-D: 8403, 8448, 8527, 8569 cGy) were significantly increased. All other significant differences reflected a decrease in dose. Plans B-D were significantly different from Plan-A for 3, 17, and 19 objectives, respectively. Plans C-D were also significantly different from Plan-B for 8 and 13 objectives, respectively. In one case (cord 50%), Plan-D provided significantly lower dose than plan C (p = 0.003). Conclusion: Combining database dose predictions with a commercial autoplanning engine resulted in significant plan quality differences for the greatest number of objectives. This translated to plan quality improvements in most cases, although special care may be needed for maximum dose constraints. Further evaluation is warranted

  18. In Situ Vitrification Engineering-Scale Test ES-INEL-4, ES-INEL-5, ES-INEL-6, and ES-INEL-7 Test Plan

    International Nuclear Information System (INIS)

    Weidner, J.R.; Stoots, P.R.

    1990-10-01

    The In Situ Vitrification Engineering-Scale Tests ES-4, ES-5, ES-6, and ES-7 Product Characterization Test Plan describes the methods and procedures to be used or the physical and chemical characterization of the solid product(s) resulting from the Idaho National Engineering Laboratory engineering scale in situ vitrification tests ES-4, ES-5, ES-6, and ES-7. The goals of this Test Plan are to insure that the product characterization results are sufficient to meet the data needs of the In Situ Vitrification Program and are technically and legally defensible. Important issues addressed by the test plan include sampling and analysis strategy, sampling procedures, laboratory analysis, sample control and document management, equipment, data reporting and validation, quality assurance, specific routine procedures to assess data representativeness, safety and training program, and data management. 9 refs., 1 fig., 3 tabs

  19. Test/QA plan for the verification testing of selective catalytic reduction control technologies for highway, nonroad use heavy-duty diesel engines

    Science.gov (United States)

    This ETV test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research (DER) describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR Part 89 for nonroad engines, will be ...

  20. A preliminary conceptual design study for Korean fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Keeman, E-mail: kkeeman@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahak-ro, Daejeon 305-806 (Korea, Republic of); Kim, Hyoung Chan; Oh, Sangjun; Lee, Young Seok; Yeom, Jun Ho; Im, Kihak; Lee, Gyung-Su [National Fusion Research Institute, 169-148 Gwahak-ro, Daejeon 305-806 (Korea, Republic of); Neilson, George; Kessel, Charles; Brown, Thomas; Titus, Peter [Princeton Plasma Physics Laboratory, Princeton University, Princeton, NJ 08543 (United States)

    2013-10-15

    Highlights: ► Perform a preliminary conceptual study for a steady-state Korean DEMO reactor. ► Present design guidelines and requirements of Korean DEMO reactor. ► Present a preliminary design of TF (toroidal field) and CS (central solenoid) magnet. ► Present a preliminary result of the radial build scheme of Korean DEMO reactor. -- Abstract: As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy, so called fast-track approach. Korean strategy for fusion energy can be regarded as a fast-track approach and one special concept discussed in this paper is a two-stage development plan. At first, a steady-state Korean DEMO Reactor (K-DEMO) is designed not only to demonstrate a net electricity generation and a self-sustained tritium cycle, but also to be used as a component test facility. Then, at its second stage, a major upgrade is carried out by replacing in-vessel components in order to show a net electric generation on the order of 300 MWe and the competitiveness in cost of electricity (COE). The major radius is designed to be just below 6.5 m, considering practical engineering feasibilities. By using high performance Nb{sub 3}Sn-based superconducting cable currently available, high magnetic field at the plasma center above 8 T can be achieved. A design concept for TF magnets and radial builds for the K-DEMO considering a vertical maintenance scheme, are presented together with preliminary design parameters.

  1. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    Energy Technology Data Exchange (ETDEWEB)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia; Pilch, Martin M.

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

  2. A PRELIMINARY STUDY OF HUMOUR IN ENGINEERING EDUCATION

    Directory of Open Access Journals (Sweden)

    SIOW C. LIM

    2017-01-01

    Full Text Available It is commonly known that humour has an implication on the process of teaching and learning. However, there is still limited study done on the implication of humour in teaching and learning engineering courses. This paper studies the perception and experience of engineering lecturers and students towards the incorporation of sense of humour in the teaching and learning of engineering courses. Online and offline surveys were conducted on the students and lecturers from the school of engineering, Taylors’ University respectively. Several interesting insights were drawn from the responses with the general consensus from both students and lecturers that humour helps in enhancing the teaching and learning process. Real case examples of how the lecturers deliver their lectures with humour were also presented.

  3. Visual Assessment on Coastal Cruise Tourism: A Preliminary Planning Using Importance Performance Analysis

    Science.gov (United States)

    Trisutomo, S.

    2017-07-01

    Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar

  4. Developing a new industrial engineering curriculum using a systems engineering approach

    Science.gov (United States)

    Buyurgan, Nebil; Kiassat, Corey

    2017-11-01

    This paper reports on the development of an engineering curriculum for a new industrial engineering programme at a medium-sized private university in the northeast United States. A systems engineering process has been followed to design and develop the new curriculum. Considering the programme curriculum as a system, first the stakeholders have been identified, and some preliminary analysis on their needs and requirements has been conducted. Following that, the phases of conceptual design, preliminary design, and detailed design have been pursued during which different levels of validation, assessment, and evaluation processes have been utilised. In addition, a curriculum assessment and continuous improvement process have been developed to assess the curriculum and the courses frequently. The resulting curriculum is flexible, allowing the pursuit of accelerated graduate programmes, a second major, various minor options, and study-abroad; relevant, tailored to the needs of industry partners in the vicinity; and practical, providing hands-on education, resulting in employment-ready graduates.

  5. Measured Engine Installation Effects of Four Civil Transport Airplanes

    Science.gov (United States)

    Senzig, David A.; Fleming, Gregg G.; Shepherd, Kevin P.

    2001-01-01

    The Federal Aviation Administration's Integrated Noise Model (INM) is one of the primary tools for land use planning around airports. The INM currently calculates airplane noise lateral attenuation using the methods contained in the Society of Automotive Engineer's Aerospace Information Report No. 1751 (SAE AIR 1751). Researchers have noted that improved lateral attenuation algorithms may improve airplane noise prediction. The authors of SAE AIR 1751 based existing methods on empirical data collected from flight tests using 1960s-technology airplanes with tail-mounted engines. To determine whether the SAE AIR 1751 methods are applicable for predicting the engine installation component of lateral attenuation for airplanes with wing-mounted engines, the National Aeronautics and Space Administration (NASA) sponsored a series of flight tests during September 2000 at their Wallops Flight Facility. Four airplanes, a Boeing 767-400, a Douglas DC-9, a Dassault Falcon 2000, and a Beech KingAir, were flown through a 20 microphone array. The airplanes were flown through the array at various power settings, flap settings, and altitudes to simulate take-off and arrival configurations. This paper presents the preliminary findings of this study.

  6. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  7. Preliminary Waste Form Compliance Plan for the Idaho National Engineering and Environmental Laboratory High-Level Waste

    Energy Technology Data Exchange (ETDEWEB)

    B. A. Staples; T. P. O' Holleran

    1999-05-01

    The Department of Energy (DOE) has specific technical and documentation requirements for high-level waste (HLW) that is to be placed in a federal repository. This document describes in general terms the strategy to be used at the Idaho National Engineering and Environmental Laboratory (INEEL) to demonstrate that vitrified HLW, if produced at the INEEL, meets these requirements. Waste form, canister, quality assurance, and documentation specifications are discussed. Compliance strategy is given, followed by an overview of how this strategy would be implemented for each specification.

  8. Preliminary Waste Form Compliance Plan for the Idaho National Engineering and Environmental Laboratory High-Level Waste

    International Nuclear Information System (INIS)

    Staples, B. A.; O'Holleran, T. P.

    1999-01-01

    The Department of Energy (DOE) has specific technical and documentation requirements for high-level waste (HLW) that is to be placed in a federal repository. This document describes in general terms the strategy to be used at the Idaho National Engineering and Environmental Laboratory (INEEL) to demonstrate that vitrified HLW, if produced at the INEEL, meets these requirements. Waste form, canister, quality assurance, and documentation specifications are discussed. Compliance strategy is given, followed by an overview of how this strategy would be implemented for each specification

  9. Cell emulation and preliminary results.

    Science.gov (United States)

    2016-07-01

    This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...

  10. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume II. Detailed technical plan. Revision 2

    International Nuclear Information System (INIS)

    1982-08-01

    The four sections which comprise Part II describe in detail the technical basis for each of the four Program Elements (PE's) of the FWBS Engineering Technology Program (ETP). Each PE is planned to be executed in a number of phases. The purpose of the DTP's is to delineate detailed near-term research, development, and testing required to establish a FWBS engineering data base. Optimum testing strategies and construction of test facilities where needed are identified. The DTP's are based on guidelines given by Argonne National Laboratory which included the basic programmatic goals and the requirements for the types of tests and test conditions

  11. Teletraffic engineering and network planning

    DEFF Research Database (Denmark)

    Iversen, Villy Bæk

    This book covers the basic theory of teletrac engineering. The mathematical backgroundrequired is elementary probability theory. The purpose of the book is to enable engineers tounderstand ITU{T recommendations on trac engineering, evaluate tools and methods, andkeep up-to-date with new practices....... The book includes the following parts: Introduction: Chapter 1 Mathematical background: Chapter 2-3 Telecommunication loss models: Chapter 4-8 Data communication delay models: Chapter 9-12 Measurement and simulation: Chapter 13 The purpose of the book is twofold: to serve both as a handbook...... and as a textbook. Thusthe reader should, for example, be able to study chapters on loss models without studyingthe chapters on the mathematical background rst.The book is based on many years of experience in teaching the subject at the TechnicalUniversity of Denmark and from ITU training courses in developing...

  12. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1 : ASC software quality engineering practices version 1.0.

    Energy Technology Data Exchange (ETDEWEB)

    Minana, Molly A.; Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Forsythe, Christi A.; Schofield, Joseph Richard, Jr.; Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2005-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in DOE/AL Quality Criteria (QC-1) as conformance to customer requirements and expectations. This quality plan defines the ASC program software quality practices and provides mappings of these practices to the SNL Corporate Process Requirements (CPR 1.3.2 and CPR 1.3.6) and the Department of Energy (DOE) document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines (GP&G). This quality plan identifies ASC management and software project teams' responsibilities for cost-effective software engineering quality practices. The SNL ASC Software Quality Plan establishes the signatories commitment to improving software products by applying cost-effective software engineering quality practices. This document explains the project teams opportunities for tailoring and implementing the practices; enumerates the practices that compose the development of SNL ASC's software products; and includes a sample assessment checklist that was developed based upon the practices in this document.

  13. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  14. Scientific investigation plan for initial engineered barrier system field tests

    International Nuclear Information System (INIS)

    Wunan Lin.

    1993-02-01

    The purpose of this Scientific Investigation Plan (SIP) is to describe tests known as Initial Engineered Barrier System Field Tests (IEBSFT) and identified by Work Breakdown Structure as WBS 1.2.2.2.4. The IEBSFT are precursors to the Engineered Barrier System Field Test (EBSFT), WBS 1.2.2.2.4, to be conducted in the Exploratory Study Facility (ESF) at Yucca Mountain. The EBSFT and IEBSFT are designed to provide information on the interaction between waste packages (simulated by heated containers) and the surrounding rock mass, its vadose water, and infiltrated water. Heater assemblies will be installed in drifts or boreholes openings and heated to measure moisture movement during heat-up and subsequent cool-down of the rock mass. In some of the tests, infiltration of water into the heated rock mass will be studied. Throughout the heating and cooling cycle, instruments installed in the rock will monitor such parameters as temperature, moisture content, concentration of some chemical species, and stress and strain. Rock permeability measurements, rock and fluid (water and gas) sampling, and fracture pattern measurements will also be made before and after the test

  15. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    Science.gov (United States)

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  16. Space architecture education for engineers and architects designing and planning beyond earth

    CERN Document Server

    Häuplik-Meusburger, Sandra

    2016-01-01

    This book considers two key educational tools for future generations of professionals with a space architecture background in the 21st century: (1) introducing the discipline of space architecture into the space system engineering curricula; and (2) developing space architecture as a distinct, complete training curriculum.  Professionals educated this way will help shift focus from solely engineering-driven transportation systems and “sortie” missions towards permanent off-world human presence. The architectural training teaches young professionals to operate at all scales from the “overall picture” down to the smallest details, to provide directive intention–not just analysis–to design opportunities, to address the relationship between human behavior and the built environment, and to interact with many diverse fields and disciplines throughout the project lifecycle. This book will benefit individuals and organizations responsible for planning transportation and habitat systems in space, while a...

  17. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  18. Environmental Management Plan for the Chemical Engineering Laboratory (LIQ) of the National University of Colombia, Bogotá

    OpenAIRE

    Javier Gama Chávez; Martha Lozano García; Paulo César Narváez Rincón; Óscar Javier Suárez Medina

    2004-01-01

    An Enviromental Management Plan was formulated with the objective of improving the environmental performance of the Chemical Engineering Laboratory (LIQ). The plan was supported on the principles established by the ISO 140001 standard. In a first step, an environmental politic was proposed. Next, by means of an initial review of the laboratory, the most significant impacts related to the activities developed in the Laboratory were identified: dangerous chemical wastes accumulation, water cont...

  19. Comparative analysis of a DI diesel engine fuelled with biodiesel blends during the European MVEG-A cycle: Preliminary study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Lujan, J.M.; Tormos, B.; Salvador, F.J.; Gargar, K. [CMT-Motores Termicos, Universidad Politecnica de Valencia, Valencia (Spain)

    2009-06-15

    The present work consists of introducing the tests and facilities used to perform a comparative analysis of a diesel engine working with different blends of biodiesel fuel during the New European Driving Cycle. Furthermore, as a preliminary study, it was interesting to know the effects of biodiesel fuel on a common-rail high pressure injection system, those more useful in modern light duty diesel engines, as a consequence of its different physicochemical properties compared with conventional diesel fuel. As the real goal of the study is to compare fairly performance and emissions from the engine, it was essential to know any injection effects owed to fuel's own characteristics that finally would affect those parameters that will be evaluated. A complete fuel characterization for diesel and biodiesel fuels, as the EN 590 and the EN 14214 standard specifications, was performed in order to quantify the differences between both fuels. A priori, it could be thought that viscosity and density values will be the most significant parameters capable of altering the injection rate. As positive results, it was obtained that the common-rail high pressure injection system was totally blind in the injection rate measurements, even the significant differences between both fuels, taking into account the counterbalancing effects generated by two parameters mentioned before. The second part of the study deals with engine performance and pollutant emissions on an unmodified common-rail turbocharged diesel engine running with biodiesel fuel blends during the New European Driving Cycle. (author)

  20. Basic plans on measures of mine site at the Ningyo-Toge Environmental Engineering Center

    International Nuclear Information System (INIS)

    2002-04-01

    At the Ningyo-Toge and its peripheries, there are some mine relating facilities and apparatuses finishing their actions such as wasted stones and slags accumulation sites, and so on formed by results of searching and mining works of uranium mine carried out from beginning of 1950s by the Nuclear Fuels Corporation and the Power Reactor and Nuclear Fuel Development Corporation, both of which are predecessors of the Japan Nuclear Cycle Development Institute (JNC). These facilities are, at present, adequately maintained and managed by the Ningyo-Toge Environmental Engineering Center, but as resource development of uranium was positioned to a disposal business on JNC, JNC has investigated on optimal measuring methods and testing plans to evaluate their safety under cooperation with other works of JNC, to summarize a draft of the basic plans on measures of mine site'. Here were described two drafts of the 'Basic plans on measures of mine site' summarized on concepts and indications of whole of measures of mine relating facilities sites and of the 'Proof test plan' summarized on testing plans containing concrete measures to obtain basic data and knowledge required for progressing the measures and a proof test. (G.K.)

  1. Preliminary engineering assessment of the HCLL and HCPB Neutron Activation System

    Energy Technology Data Exchange (ETDEWEB)

    Calderoni, Pattrick; Leichtle, Dieter [Fusion for Energy, Barcelona, (Spain); Angelone, Maurizio [ENEA, Unita Tecnica Fusione, Frascati, (Italy); Klix, Axel [KIT, Eggenstein-Leopoldshafen, (Germany)

    2015-07-01

    The Neutron Activation System (NAS) is one of the four types of neutronics sensors considered for the testing of the HCLL and HCPB Test Blanket Module (TBM) in ITER. It measures the absolute neutron flux intensity with information on the neutron spectrum in selected positions of the TBM. The working principle of the NAS is as follows: the system moves small activation probes (capsules) into selected positions in the TBM (irradiation ends) by means of pneumatic transport with pressurized helium gas; the capsules are irradiated for a selected period, depending on their materials composition (several tens of seconds up to the full plasma pulse length); immediately after the irradiation they are extracted and transported to a gamma spectrometer by means of the same pneumatic transport system; the gamma spectrometer determines the induced gamma activity; the neutron flux and neutron fluence is calculated from the measured gamma activity and the known activation cross section of the materials in the activation probe; after the measurement the capsule is sent either to a disposal or storage (for later measurement). This paper summarizes the results of the feasibility assessment of the TBM NAS in the conceptual design phase, including design justification, identification of requirements based on the expected operating conditions in ITER and preliminary engineering assessment of the activation materials, irradiation ends integration in the modules design and the counting station. (authors)

  2. Nevada potential repository preliminary transportation strategy Study 2. Volume 1

    International Nuclear Information System (INIS)

    1996-02-01

    The objectives of this study were to build on the findings of the Nevada Potential Repository Preliminary Transportation Strategy Study 1 (CRWMS M ampersand O 1995b), and to provide additional information for input to the repository environmental impact statement (EIS) process. In addition, this study supported the future selection of a preferred rail corridor and/or heavy haul route based on defensible data, methods, and analyses. Study research did not consider proposed legislation. Planning was conducted according to the Civilian Radioactive Waste Management Program Plan (DOE 1994a). The specific objectives of Study 2 were to: eliminate or reduce data gaps, inconsistencies, and uncertainties, and strengthen the analysis performed in Study 1; develop a preliminary list of rail route evaluation criteria that could be used to solicit input from stakeholders during scoping meetings. The evaluation criteria will be revised based on comments received during scoping; restrict and refine the width of the four rail corridors identified in Study 1 to five miles or less, based on land use constraints and engineering criteria identified and established in Study 2; evaluate national-level effects of routing spent nuclear fuel and high-level waste to the four identified branch lines, including the effects of routing through or avoiding Las Vegas; continue to gather published land use information and environmental data to support the repository EIS; continue to evaluate heavy haul truck transport over three existing routes as an alternative to rail and provide sufficient information to support the repository EIS process; and evaluate secondary uses for rail (passenger use, repository construction, shared use)

  3. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    International Nuclear Information System (INIS)

    Liu, Baochang; Darko, Johnson; Osei, Ernest

    2016-01-01

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D m ) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  4. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Baochang; Darko, Johnson; Osei, Ernest [Grand River Regional Cancer Centre, Kitchener, Ontario (Canada)

    2016-08-15

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D{sub m}) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  5. Planning and design considerations in karst terrain

    Science.gov (United States)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures

  6. Engineering computer graphics in gas turbine engine design, analysis and manufacture

    Science.gov (United States)

    Lopatka, R. S.

    1975-01-01

    A time-sharing and computer graphics facility designed to provide effective interactive tools to a large number of engineering users with varied requirements was described. The application of computer graphics displays at several levels of hardware complexity and capability is discussed, with examples of graphics systems tracing gas turbine product development, beginning with preliminary design through manufacture. Highlights of an operating system stylized for interactive engineering graphics is described.

  7. Preliminary comparison of the Essie and PubMed search engines for answering clinical questions using MD on Tap, a PDA-based program for accessing biomedical literature.

    Science.gov (United States)

    Sutton, Victoria R; Hauser, Susan E

    2005-01-01

    MD on Tap, a PDA application that searches and retrieves biomedical literature, is specifically designed for use by mobile healthcare professionals. With the goal of improving the usability of the application, a preliminary comparison was made of two search engines (PubMed and Essie) to determine which provided most efficient path to the desired clinically-relevant information.

  8. In situ vitrification engineering-scale test ES-INEL-5 test plan

    International Nuclear Information System (INIS)

    Stoots, P.R.

    1990-06-01

    In 1952, the Radioactive Waste Management Complex (RWMC) was established at the Idaho National Engineering Laboratory (INEL). RWMC is located on approximately 144 acres in the southwestern corner of the INEL site and was established as a controlled area for the burial of solid low-level wastes generated by INEL operations. In 1954, the 88-acre Subsurface Disposal Area (SDA) of RWMC began accepting solid transuranic-contaminated waste. From 1954 to 1970, transuranic-contaminated waste was accepted from the Rocky Flats Plant (RFP) near Golden, CO, as well as from other US Department of Energy (DOE) locations. In 1987, the Buried Waste Program (BWP) was established by EG ampersand G Idaho, Inc., the prime contractor at INEL. Following the Environmental Restoration guidelines of the Buried Waste Program, the In Situ Vitrification Program is participating in a Remedial Investigation/Feasibility Study (RI/FS) for permanent disposal of INEL waste, in compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This study was requested and is being funded by the Office of Technology Development of the Idaho Operations Office of DOE (DOE-ID). As part of the RI/FS, an in situ vitrification (ISV) scoping study on the treatability of mixed low-level and mixed transuranic-contaminated waste is being performed to determine applicability of ISV to remediation of waste at SDA. This In Situ Vitrification Engineering-Scale Test ES-INEL-5 Test Plan considers the data needs of engineering, regulatory, health, and safety activities for all sampling and analysis activities in support of engineering scale test ES-INEL-5. 5 refs., 3 figs., 4 tabs

  9. Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope

    Science.gov (United States)

    Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.

    2012-09-01

    Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.

  10. Design study on the helium engineering demonstration loop (HENDEL)

    International Nuclear Information System (INIS)

    Aochi, Tetsuo; Yasuno, Takehiko; Muto, Yasushi; Suzuki, Kunihiko

    1977-11-01

    Four reference studies made on Helium Engineering Demonstration Loop (HENDEL) are described. HENDEL is used in confirmation of the designs of VHTR components such as reactor structure, core structure, intermediate heat exchanger and piping. It consists of mother loop, adapter section and four test sections for fuel stack, reactor support and insulation structure, core structure and high temperature heat transfer component respectively. System and component designs of the mother and adapter section and preliminary designs of the four test sections are shown. And, the plans of operation, instrumentation, control, safety, utilities (electricity, cooling water and helium gas) and construction schedule of HENDEL and research and development of the test sections are also briefed. (auth.)

  11. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  12. Engineering Design Handbook. Helicopter Engineering. Part One. Preliminary Design

    Science.gov (United States)

    1974-08-30

    the cost of prime interest being life-cycle cost, climate that is hot or cold, in atmosphere that is humid Chapter 3 discusses helicopter performance...required to satisfy 8-3.2 ENGINE INSTALLATION LOSSES varying climatic and environmental factors. For in- stance, maintenance of the helicopter should be...thammable h aulic , asytem l at mhtproidtem a considering the overall flight mission in segments, dur- source of flammable fluids, as well as electrical

  13. Horonobe underground research laboratory project. The plan for the in-situ experiments in Phase 2 and Phase 3 in/around URL

    International Nuclear Information System (INIS)

    Matsui, Hiroya

    2005-09-01

    This report describes for preliminary research plan in Phase 2 and Phase 3 taken into consideration of expected geological environment at location of URL based on the results of the investigations until FY 2003/2004. Duration of construction phase and total cost are considered as important factors for planning as well. The below items are planned for in-situ experiments in Phase 2 and Phase 3 in/around URL are planning. Phase 2. (In-situ experiments for understanding of geological environment) Geological survey at tunnel. Inflow measurement in shafts. Water pressure monitoring and groundwater sampling around shafts during excavation of URL. Investigation for EDZ around shafts. Stress measurement on support. Detail investigations for geological environment around drifts. Excavation disturbance experiment in a drift. Investigation for desaturation zone and REDOX condition around drifts. (Engineered barrier system) In-situ experiment on low-alkali concrete. In-situ experiment for gas migration in engineering barrier system. Phase 3. (In-situ experiments for understanding of geological environment) EDZ experiment for stress interference. Investigation of long-term behavior of EDZ around drifts. Detail investigation on fault/fault zone. Monitoring for the change of geological environment at earthquake. Backfill test in boreholes. (Engineered barrier system) T-H-M-C experiment. In-situ experiment for corrosion of overpack. Investigation of the influence of a concrete to engineering barrier system and geological environment. In-situ experiment for interference between backfill material and geological environment. Backfill test in a drift. (Safety assessment) Tracer tests in engineering barrier system, natural barrier and fault/fault zone. (author)

  14. Birth Planning Values and Decisions: Preliminary Findings.

    Science.gov (United States)

    Townes, Brenda D.; And Others

    The values and processes which underlie people's birth planning decisions were studied via decision theory. Sixty-three married couples including 23 with no children, 33 with one child, and 27 with two children were presented with a large set of personal values related to birth planning decisions. Individuals rated the importance or utility of…

  15. Scope and status of the USA Engineering Test Facility including relevant TFTR research and development

    International Nuclear Information System (INIS)

    Becraft, W.R.; Reardon, P.J.

    1980-01-01

    The vehicle by which the fusion program would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The progress toward the design and construction of the ETF will reflect the significant achievements of past, present, and future experimental tokamak devices. Some of the features of this foundation of experimental results and relevant engineering designs and operation will derive from the Tokamak Fusion Test Reactor (TFTR) Project, now nearing the completion of its construction phase. The ETF would provide a test-bed for reactor components in the fusion environment. In order to initiate preliminary planning for the ETF decision, the Office of Fusion Energy (OFE) established the ETF Design Center activity to prepare the design of the ETF. This paper describes the design status of the ETF and discusses some highlights of the TFTR R and D work

  16. Scope and status of the USA Engineering Test Facility including relevant TFTR research and development

    International Nuclear Information System (INIS)

    Becraft, W.R.; Reardon, P.J.

    1981-01-01

    The vehicle by which the fusion programme would move into the engineering testing phase of fusion power development is designated the Engineering Test Facility (ETF). The progress toward the design and construction of the ETF will reflect the significant achievements of past, present, and future experimental tokamak devices. Some of the features of this foundation of experimental results and relevant engineering designs and operation will derive from the Tokamak Fusion Test Reactor (TFTR) Project, now nearing the completion of its construction phase. The ETF would provide a test-bed for reactor components in the fusion environment. To initiate preliminary planning for the ETF decision, the Office of Fusion Energy (OFE) established the ETF Design Center activity to prepare the design of the ETF. This paper describes the design status of the ETF and discusses some highlights of the TFTR R and D work. (author)

  17. Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004

    Energy Technology Data Exchange (ETDEWEB)

    Enge, R.S.

    1999-12-01

    In this first institutional plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus its efforts on three strategic thrusts: (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemicals from biomass). The first strategic thrust focuses on meeting DOE-EMs environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NEs needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this institutional plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this institutional plan will offer additional content and resource refinements.

  18. Trade-off results and preliminary designs of Near-Term Hybrid Vehicles

    Science.gov (United States)

    Sandberg, J. J.

    1980-01-01

    Phase I of the Near-Term Hybrid Vehicle Program involved the development of preliminary designs of electric/heat engine hybrid passenger vehicles. The preliminary designs were developed on the basis of mission analysis, performance specification, and design trade-off studies conducted independently by four contractors. THe resulting designs involve parallel hybrid (heat engine/electric) propulsion systems with significant variation in component selection, power train layout, and control strategy. Each of the four designs is projected by its developer as having the potential to substitute electrical energy for 40% to 70% of the petroleum fuel consumed annually by its conventional counterpart.

  19. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  20. Hot air balloon engine

    Energy Technology Data Exchange (ETDEWEB)

    Edmonds, Ian [Solartran Pty Ltd, 12 Lentara Street, Kenmore, Brisbane 4069 (Australia)

    2009-04-15

    This paper describes a solar powered reciprocating engine based on the use of a tethered hot air balloon fuelled by hot air from a glazed collector. The basic theory of the balloon engine is derived and used to predict the performance of engines in the 10 kW to 1 MW range. The engine can operate over several thousand metres altitude with thermal efficiencies higher than 5%. The engine thermal efficiency compares favorably with the efficiency of other engines, such as solar updraft towers, that also utilize the atmospheric temperature gradient but are limited by technical constraints to operate over a much lower altitude range. The increased efficiency allows the use of smaller area glazed collectors. Preliminary cost estimates suggest a lower $/W installation cost than equivalent power output tower engines. (author)

  1. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    Science.gov (United States)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  2. Engine Management : A Decision Support Tool for Strategic Engine Maintenance Planning

    NARCIS (Netherlands)

    Mayordomo, A.F.; Ghobbar, A.A.; Ghijs, S.S.A.; Cator, E.

    2010-01-01

    This paper presents a model that helps engine management make cost saving decisions. The model is developed around airline-influenced factors that have an impact on engine Maintenance Repair & Overhaul (MRO): Operations, maintenance philosophy, contract type, and fleet age. Within the model a

  3. Hydrogen hybrid vehicle engine development: Experimental program

    Energy Technology Data Exchange (ETDEWEB)

    Van Blarigan, P. [Sandia National Lab., Livermore, CA (United States)

    1995-09-01

    A hydrogen fueled engine is being developed specifically for the auxiliary power unit (APU) in a series type hybrid vehicle. Hydrogen is different from other internal combustion (IC) engine fuels, and hybrid vehicle IC engine requirements are different from those of other IC vehicle engines. Together these differences will allow a new engine design based on first principles that will maximize thermal efficiency while minimizing principal emissions. The experimental program is proceeding in four steps: (1) Demonstration of the emissions and the indicated thermal efficiency capability of a standard CLR research engine modified for higher compression ratios and hydrogen fueled operation. (2) Design and test a new combustion chamber geometry for an existing single cylinder research engine, in an attempt to improve on the baseline indicated thermal efficiency of the CLR engine. (3) Design and build, in conjunction with an industrial collaborator, a new full scale research engine designed to maximize brake thermal efficiency. Include a full complement of combustion diagnostics. (4) Incorporate all of the knowledge thus obtained in the design and fabrication, by an industrial collaborator, of the hydrogen fueled engine for the hybrid vehicle power train illustrator. Results of the CLR baseline engine testing are presented, as well as preliminary data from the new combustion chamber engine. The CLR data confirm the low NOx produced by lean operation. The preliminary indicated thermal efficiency data from the new combustion chamber design engine show an improvement relative to the CLR engine. Comparison with previous high compression engine results shows reasonable agreement.

  4. The basics of integrating environmental and engineering in early wind farm siting

    Energy Technology Data Exchange (ETDEWEB)

    Alberti, A. [Tetra Tech Inc., Oakville, ON (Canada)

    2010-07-01

    This PowerPoint presentation discussed methods of integrating environmental and engineering studies into the early phases of wind farm siting plans. Most renewable energy development projects begin by an assessment of the transmission capability and renewable resources, followed by engineering and environmental screening procedures. Transmission screening is conducted to identify preliminary interconnection corridors between potential development sites and potential interconnecting transmission lines. Critical issues analysis (CIA) studies identify conditions, siting issues, and potential environmental and engineering tasks related to early scheduling and budget procedures. The components of a CIA include desktop and field studies that are conducted to document issues that warrant special consideration. Team members are comprised of qualified experts who are familiar with the geographic region and are able to collaborate at an early stage in the project. However, many CIA studies do not consider engineering constructability issues or develop strategies for ensuring community support for wind power projects. Conceptual layouts for wind power facilities include information related to turbine locations, access roads, and transmission lines and equipment. Engineering studies are used to evaluate conditions and potential hazards. Issues related to agricultural sites must also be considered. The final locations of turbines must be checked to ensure constructability and energy production potential. tabs., figs.

  5. Development and preliminary analyses of material balance evaluation model in nuclear fuel cycle

    International Nuclear Information System (INIS)

    Matsumura, Tetsuo

    1994-01-01

    Material balance evaluation model in nuclear fuel cycle has been developed using ORIGEN-2 code as basic engine. This model has feature of: It can treat more than 1000 nuclides including minor actinides and fission products. It has flexibility of modeling and graph output using a engineering work station. I made preliminary calculation of LWR fuel high burnup effect (reloading fuel average burnup of 60 GWd/t) on nuclear fuel cycle. The preliminary calculation shows LWR fuel high burnup has much effect on Japanese Pu balance problem. (author)

  6. Feasibility study of a pressure-fed engine for a water recoverable space shuttle booster. Volume 3, part 1: Program acquisition planning

    Science.gov (United States)

    Olsen, C. D.

    1972-01-01

    Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.

  7. Implementation of Capacity Planning Agent of Demand Responsive Planning Framework : Master’s Thesis in Production Engineering of The Royal Institute of Technology

    OpenAIRE

    Juhong, Nirut

    2013-01-01

    This master’s thesis is conducted as a conclusion of Master degree of Science in Production Engineering and Management at The Royal Institute of Technology. The focus of this thesis work is to implement a Capacity planning agent. Nowadays, companies need to adapt themselves to be as responsive to customers’ demand as possible. However, the responsiveness is usually limited by the fixed capacity of the production. Evolvable Production System (EPS), motivated by the limitation mentioned above, ...

  8. Versator divertor experiment: preliminary designs

    International Nuclear Information System (INIS)

    Wan, A.S.; Yang, T.F.

    1984-08-01

    The emergence of magnetic divertors as an impurity control and ash removal mechanism for future tokamak reactors bring on the need for further experimental verification of the divertor merits and their ability to operate at reactor relevant conditions, such as with auxiliary heating. This paper presents preliminary designs of a bundle and a poloidal divertor for Versator II, which can operate in conjunction with the existing 150 kW of LHRF heating or LH current drive. The bundle divertor option also features a new divertor configuration which should improve the engineering and physics results of the DITE experiment. Further design optimization in both physics and engineering designs are currently under way

  9. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  10. Environmental Management Plan for the Chemical Engineering Laboratory (LIQ of the National University of Colombia, Bogotá

    Directory of Open Access Journals (Sweden)

    Javier Gama Chávez

    2004-01-01

    Full Text Available An Enviromental Management Plan was formulated with the objective of improving the environmental performance of the Chemical Engineering Laboratory (LIQ. The plan was supported on the principles established by the ISO 140001 standard. In a first step, an environmental politic was proposed. Next, by means of an initial review of the laboratory, the most significant impacts related to the activities developed in the Laboratory were identified: dangerous chemical wastes accumulation, water contamination by effusions generation and air contamination. These impacts were the base for formulating following and control programs, furthermire, a training an communication program was done. All the programs, including the requiered documents and procedures, were published in the Environmental Management Plan and the Environmental Procedures Manual.

  11. Planning of modern process control systems in processing engineering and power plant engineering. Planung von modernen Prozessleitsystemen in der Verfahrens- und Kraftwerkstechnik

    Energy Technology Data Exchange (ETDEWEB)

    Gilson, W

    1985-01-01

    Correct planning of up-to-date process control systems results in considerable process automation and rationalization. These systems are used in process engineering, in production plants of the chemical industries and in power stations to a growing extent and rapidly reveal their advantages in terms of increased efficiency, improved product quality and reduced maintenance. However, this necessitates to make full and consistent use of the systems' qualities. Lack of experience often result in flows and errors in planning. The VDE und VDI district associations, Frankfurt, selected this subject for this year's discussion in the working group in February/March 1985 in order to provide a comprehensive coverage and demonstration of the field concerned. Experts and interested persons are given information on what facts will have to be observed during all stages in the planning of up-to-date process control systems. The book deals with the following subjects: From the process involved to the structure of the control system; - system specification and system selection; - configuration and project-accompagnying documentation; - trends and prospects exemplified by recent developments.

  12. Preliminary Evaluation of a Turbine/Rotary Combustion Compound Engine for a Subsonic Transport. [fuel consumption and engine tests of turbofan engines

    Science.gov (United States)

    Civinskas, K. C.; Kraft, G. A.

    1976-01-01

    The fuel consumption of a modern compound engine with that of an advanced high pressure ratio turbofan was compared. The compound engine was derived from a turbofan engine by replacing the combustor with a rotary combustion (RC) engine. A number of boost pressure ratios and compression ratios were examined. Cooling of the RC engine was accomplished by heat exchanging to the fan duct. Performance was estimated with an Otto-cycle for two levels of energy lost to cooling. The effects of added complexity on cost and maintainability were not examined and the comparison was solely in terms of cruise performance and weight. Assuming a 25 percent Otto-cycle cooling loss (representative of current experience), the best compound engine gave a 1.2 percent improvement in cruise. Engine weight increased by 23 percent. For a 10 percent Otto-cycle cooling loss (representing advanced insulation/high temperature materials technology), a compound engine with a boost PR of 10 and a compression ratio of 10 gave an 8.1 percent lower cruise than the reference turbofan.

  13. Physics goals for the planned next linear collider engineering test facility

    International Nuclear Information System (INIS)

    Bohn, C.; Michelotti, L.; Ostiguy, J.-F.; Syphers, M.; Bluem, H.; Todd, A.; Gai, W.; Power, J.; Simpson, J.; Raubenheimer, T.

    2001-01-01

    The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well as of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam

  14. Physics Goals for the Planned Next Linear Collider Engineering Test Facility

    International Nuclear Information System (INIS)

    Raubenheimer, Tor O

    2001-01-01

    The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well as of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam

  15. Development of engineering drawing ability for emerging engineering education

    Science.gov (United States)

    Guo, Jian-Wen; Cao, Xiao-Chang; Xie, Li; Jin, Jian-Jun; Wang, Chu-Diao

    2017-09-01

    Students majoring in engineering is required by the emerging engineering education (3E) in the aspect of their ability of engineering drawing. This paper puts forward training mode of engineering drawing ability for 3E. This mode consists of three kinds of training including training in courses, training in competitions and training in actual demand. We also design the feasible implementation plan and supplies viable references to carry out the mode.

  16. Diesel engine emission deterioration - a preliminary study

    CSIR Research Space (South Africa)

    Pretorius, Cecilia J

    2016-04-01

    Full Text Available The objective of this study was to find a parameter in diesel and oil analysis of underground mining vehicles that can be correlated with personal diesel particulate matter (DPM) exposure and used as part of an engine maintenance programme. A number...

  17. Wood-waste fuelled indirectly-fired gas turbine cogeneration plant for sawmill applications. Phase 2. Site-specific preliminary engineering and financial analysis

    Energy Technology Data Exchange (ETDEWEB)

    1988-03-01

    The use of conventional steam/electricity cogeneration systems is not generally economical at the sawmill scale of operation. This paper describes an evaluation of a wood-waste fueled and, indirectly, gas fired turbine cogeneration plant aimed at developing a cost-effective wood-waste fired power generation and dry kiln heating system for sawmill applications. A preliminary engineering design and financial analysis of the system was prepared for a demonstration site in British Columbia. A number of alternative system configurations were identified and preliminary engineering designs prepared for each. In the first option , wood wastes combusted in a wet cell hot gas generator powered a 600 kW turbine, and produced 7,000 kW for the drying kilns. The second option provided the same electrical and heat output but used a down-fired suspension burner unit fuelled by clean, dried sawdust, together with an integral air heater heat exchanger. The third option represented a commercial-scale configuration with an electrical output of 1,800 kW, and sufficient heat output for the dry kilns. A financial analyis based on a computerized feasibility model was carried out on the last two options. Low electricity rates in British Columbia combined with the small scale of a demonstration project provide an inadequate rate of return at the site without substantial outside support. At a commercial scale of operation and with the higher electricity prices that exist outside of British Columbia the financial analysis indicates that the incremental investment in the electric generation portion of the system provides very attractive rates of return for the 3 options. 11 figs., 10 tabs.

  18. An urban plan for CERN

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    The GS Department has just initiated several preliminary studies with a view to the elaboration of an urban plan for CERN. The aim is to re-define the organisation of the Laboratory's infrastructures and give it a new lease of life where the top priorities are environmental protection and quality of life for all who work here.   When CERN was established in 1954, the land was made available to the Laboratory by the Host States for exclusively scientific purposes. The question as to how the infrastructures would be organised was not on the agenda. Buildings were erected one after another to meet the needs of one scientific project after another. Nearly all of CERN's financial resources were then poured into the construction of the LHC but hardly any were invested in its infrastructure. "Back around 2000, we started realising how dilapidated certain buildings were becoming," notes Matti Tiirakari, who heads the Site Engineering and Management Group in the GS Department. But agein...

  19. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  20. Toward global planning of sustainable use of the earth. Development of global eco-engineering

    Energy Technology Data Exchange (ETDEWEB)

    Murai, S [ed.; School of Advanced Technologies, Asian Institute of Technology, Bangkok (Thailand)

    1995-07-01

    Better understanding of global environmental systems and the magnitude of human impacts is the most fundamental research task for developing an ecologically sound basis for the continuous human habitation and sustainable development of the earth`s limited resources. Although many research projects are already underway to begin addressing these issues, using global data mainly obtained from remote sensing technologies, our knowledge is far from sufficient. This volume is intended to promote further research towards the development of global eco-engineering which is seeking continuous human habitation and improvement of human welfare, based on the sustainable utilization of global environmental resources and preservation of global eco-systems. In the 42 papers in this volume a variety of disciplines is covered, including remote sensing, geography, meteorology, biology, biochemistry, ecology, marines science, hydrology, agriculture, environmental engineering, urban planning, social science, economy, ethics and philosophy. 160 figs., 66 tabs., 760 refs.

  1. Independent calculation-based verification of IMRT plans using a 3D dose-calculation engine

    International Nuclear Information System (INIS)

    Arumugam, Sankar; Xing, Aitang; Goozee, Gary; Holloway, Lois

    2013-01-01

    Independent monitor unit verification of intensity-modulated radiation therapy (IMRT) plans requires detailed 3-dimensional (3D) dose verification. The aim of this study was to investigate using a 3D dose engine in a second commercial treatment planning system (TPS) for this task, facilitated by in-house software. Our department has XiO and Pinnacle TPSs, both with IMRT planning capability and modeled for an Elekta-Synergy 6 MV photon beam. These systems allow the transfer of computed tomography (CT) data and RT structures between them but do not allow IMRT plans to be transferred. To provide this connectivity, an in-house computer programme was developed to convert radiation therapy prescription (RTP) files as generated by many planning systems into either XiO or Pinnacle IMRT file formats. Utilization of the technique and software was assessed by transferring 14 IMRT plans from XiO and Pinnacle onto the other system and performing 3D dose verification. The accuracy of the conversion process was checked by comparing the 3D dose matrices and dose volume histograms (DVHs) of structures for the recalculated plan on the same system. The developed software successfully transferred IMRT plans generated by 1 planning system into the other. Comparison of planning target volume (TV) DVHs for the original and recalculated plans showed good agreement; a maximum difference of 2% in mean dose, − 2.5% in D95, and 2.9% in V95 was observed. Similarly, a DVH comparison of organs at risk showed a maximum difference of +7.7% between the original and recalculated plans for structures in both high- and medium-dose regions. However, for structures in low-dose regions (less than 15% of prescription dose) a difference in mean dose up to +21.1% was observed between XiO and Pinnacle calculations. A dose matrix comparison of original and recalculated plans in XiO and Pinnacle TPSs was performed using gamma analysis with 3%/3 mm criteria. The mean and standard deviation of pixels passing

  2. Implications of the timing of the preliminary determination of suitability

    International Nuclear Information System (INIS)

    Cotton, T.A.

    1986-01-01

    The Nuclear Waste Policy Act of 1982 requires that the Enviromental Impact Statement prepared for the recommendation of a repository site must consider three sites -- the one selected for the repository and at least two alternatives. All of these sites must have been characterized, and the Secretary of Energy must have made a preliminary determination that each is suitable for development as a repository. There is great disagreement about whether that ''preliminary determination of suitability'' is to be made before or after site characterization. If the Act is interpreted as requiring the determination to be made after characterization is completed, DOE cannot recommend the first site for licensing until it has three sites that appear suitable after full characterization; if the determination can be made before characterization, DOE can proceed to licensing even if only one site survives characterization. While DOE plans to make the preliminary determination before starting characterization, the uncertainty about how a court might ultimately interpret the Act injects a significant institutional uncertainty into the schedule for the repository, and complicates contingency planning for the siting process. Early resolution of the interpretation would greatly aid DOE's planning for the siting program

  3. Expert System Approach For Generating And Evaluating Engine Design Alternatives

    Science.gov (United States)

    Shen, Stewart N. T.; Chew, Meng-Sang; Issa, Ghassan F.

    1989-03-01

    Artificial intelligence is becoming an increasingly important subject of study for computer scientists, engineering designers, as well as professionals in other fields. Even though AI technology is a relatively new discipline, many of its concepts have already found practical applications. Expert systems, in particular, have made significant contributions to technologies in such fields as business, medicine, engineering design, chemistry, and particle physics. This paper describes an expert system developed to aid the mechanical designer with the preliminary design of variable-stroke internal-combustion engines. The expert system accomplished its task by generating and evaluating a large number of design alternatives represented in the form of graphs. Through the application of structural and design rules directly to the graphs, optimal and near optimal preliminary design configurations of engines are deduced.

  4. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented

  5. Preliminary study on the control of direct injection diesel engine for better fuel flexibility and emissions control. Pt. 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Egnell, R.; Kassem, N.; Bohlin, T.

    1985-01-01

    This report summarizes the results of a preliminary study on turbocharged direct injection diesel engines. Part I reviews the qualitative dynamic aspects of turbocharged diesel engine and the factors that affect its transient behaviour. It gives a brief account of the model structure and the interrelationships between the different components of the model as well as the different types of engine models and the methods of simulation. The transient response of a turbocharged engine under changing load, speed, and ambient conditions are discussed. Methods to improve the transient response, thus reducing fuel consumption and smoke emissions are briefly reviewed. Finally, both conventional and advanced control strategies are discussed with emphasis on the control of fuel injection (Delta-control), injection time (Alfa-control), and exhaust gas recirculation (EGR-control). Part II (in Swedish) consists of a literature survey on hardware components such as sensors, actuators, and injection systems that are, or expect to be, available with reasonable commercial costs. The objective of this survey is to provide the grounds on which to decide if these components satisfy the requirements of electronic control systems. Part III (in Swedish) discusses the transient response measurements obtained from two sets of experiments conducted on a six-cylinder motor working under varying conditions of load and speed. The objective of the first set of experiments was to quantify the difference in ignition delay between the transient and steady state operating conditions. The second set of experiments were aimed to provide a basis on which the engine efficiency obtained under transient conditions can be compared to that obtained from a single-cylinder motor working under steady state conditions.

  6. Introduction of Human Factors Engineering Program Plan of a Research Reactor

    International Nuclear Information System (INIS)

    Jang, Tong Il; Lee, Hyun Chul

    2011-01-01

    KAERI (Korea Atomic Energy Research Institute) has a contract with Jordan to export a research and training reactor. KAERI is performing the project as an SD (System Design) and the design work has been performing by 8 design teams which include an Instrumentation and Control (I and C). A design of the MCR (Main Control Room) and the SCR (Supplementary Control Room) is being developed by the HFE design team which is a part of the I and C team. For the control room design considering the human factors principles, the HFE design team developed an HFEPP (Human Factors Engineering Program Plan) which should be established to meet regulatory requirements. In this study, the HFEPP for the JRTR (Jordan Research and Training Reactor) is introduced and the details are described

  7. A free-piston Stirling engine/linear alternator controls and load interaction test facility

    Science.gov (United States)

    Rauch, Jeffrey S.; Kankam, M. David; Santiago, Walter; Madi, Frank J.

    1992-01-01

    A test facility at LeRC was assembled for evaluating free-piston Stirling engine/linear alternator control options, and interaction with various electrical loads. This facility is based on a 'SPIKE' engine/alternator. The engine/alternator, a multi-purpose load system, a digital computer based load and facility control, and a data acquisition system with both steady-periodic and transient capability are described. Preliminary steady-periodic results are included for several operating modes of a digital AC parasitic load control. Preliminary results on the transient response to switching a resistive AC user load are discussed.

  8. Preliminary engineering analysis for clothes washers

    Energy Technology Data Exchange (ETDEWEB)

    Biermayer, Peter J.

    1996-10-01

    The Engineering Analysis provides information on efficiencies, manufacturer costs, and other characteristics of the appliance class being analyzed. For clothes washers, there are two classes: standard and compact. Since data were not available to analyze the compact class, only clothes washers were analyzed in this report. For this analysis, individual design options were combined and ordered in a manner that resulted in the lowest cumulative cost/savings ratio. The cost/savings ratio is the increase in manufacturer cost for a design option divided by the reduction in operating costs due to fuel and water savings.

  9. Status and plans for the next generation magnetically immersed diodes on RITS

    International Nuclear Information System (INIS)

    Rovang, Dean; Kincy, Mark; Maenchen, John; Menge, Peter; Molina, Isidro; Olson, Craig; Welch, Dale; Oliver, Bryan; Ives, Harry; VanDeValde, David; Johnson, David L.; Lesch, Benny; Swenson, Chuck

    2002-01-01

    Sandia National Laboratories is investigating and developing high-dose, high-brightness flash radiographic sources. We are in the process of designing; fabricating and conducting engineering tests on the next-generation magnetically immersed electron diodes. These diodes employ unique, large-bore (80-110 mm), high-field (28-45 T), cryogenically-cooled solenoid magnets to help produce an intense electron beam from a needle-like cathode 'immersed' in the strong Bz field of the magnet. The diode designs and status of the engineering development are described. Later this year we plan to conduct experiments with these sources on the new Radiographic Integrated Test Stand (RITS), now in operation at Sandia. In its present three-stage configuration, RITS provides a 4-MV, 150-kA, 70-ns pulse to the diode. Fully three-dimensional particle in cell LSP code simulations are used to investigate relevant physics issues and the expected radiographic performance (spot size and dose) of this system. Preliminary results from these simulations are described

  10. Introduction to Waste Engineering

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund

    2011-01-01

    Solid waste management as introduced in Chapter 1.1 builds in many ways on engineering. Waste engineering here means the skills and ability to understand quantitatively how a waste management system works in such a detail that waste management can be planned, facilities can be designed and sited......) regional plans for waste management, including (3) the selection of main management technologies and siting of facilities, (4) the design of individual technological units and, for example, (5) the operation of recycling schemes within a municipality. This chapter gives an introduction to waste engineering...

  11. Design of a New Research Reactor: Preliminary Conceptual Design (3rd Year)

    International Nuclear Information System (INIS)

    Park, Cheol; Lee, B. C.; Chae, H. T. and others

    2006-01-01

    A research reactor design is a kind of integral engineering project and a process to obtain a concrete shape through several years of concept development, conceptual design, basic design and detail design. So it requires close cooperation in various areas as well as lots of manpower and cost. The overall process at each stage may be said to be similar except for some stage-specific works. In 2005 as last year of a concept development stage, investigations on the various concepts of the fuel, reactor structure and systems which can meet the requirements established. The requirements for the process systems and I and C systems have also been embodied. The major tasks planned at the early of 2005 have been performed for each area of reactor design as follows: Establishment of the fuel and reactor core concept, and the core analysis, Preliminary thermal-hydraulic and safety analyses for the conceptual cores, Establishment and improvement of analysis system, Concept developments of the reactor structures and major systems, Test and test plan to verify the developed concepts, International cooperation to establish the foundations for exporting a research reactor

  12. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs

  13. Engineering, Analysis and Technology FY 1995 Site Support Program Plan

    International Nuclear Information System (INIS)

    Suyama, R.M.

    1994-09-01

    The vision of the Engineering, Analysis and Technology organization is to be recognized as the cost-effective supplier of specialized, integrated, multi-disciplined engineering teams to support Hanford missions. The mission of the Engineering, Analysis and Technology organization is to provide centralized engineering services. These services are focused on supplying technical design, analytical engineering and related support services that support Hanford's environmental restoration mission. These services include engineering analysis, design and development of systems and engineered equipment, supplying multi-disciplined engineering teams to all Hanford programs and project organizations, engineering document release, and site-wide leadership in the development and implementation of engineering standards, engineering practices, and configuration management processes

  14. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  15. Implementing of action plans for risk communication on the uranium mining sites remedy at Ningyo-Toge Environmental Engineering Center

    International Nuclear Information System (INIS)

    Yabuta, Naohiro; Kawai, Jun; Hikawa, Tamae

    2005-02-01

    On the closure of uranium production facilities, settled at Ningyo-Toge Environmental Engineering Center and other area in Okayama and Tottori prefectures, action plans for risk communication with residence and local governments were developed and implemented. With the direction of the action plans for risk communication, 'Imaging plan for developing the local area around Ningyo-Toge' were drawn. Furthermore, practical program called Ethnography by High School Students' were developed, which draw the outlines of past and future around Ningyo-Toge with the insights of high school students, and conducted. As the fundamental materials required to conduct the program above, the topography of northern part of Okayama prefecture, the history and cultures of Kamisaibara village, the history of the uranium mining sites at Ningyo-Toge and Japanese nuclear energy development were clarified. Furthermore, Emergency management plans during pursuing of risk communication plans were also developed. (author)

  16. New shipyard layout design for the preliminary phase & case study for the green field project

    Science.gov (United States)

    Song, Young Joo; Woo, Jong Hun

    2013-03-01

    For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

  17. New shipyard layout design for the preliminary phase & case study for the green field project

    Directory of Open Access Journals (Sweden)

    Young Joo Song

    2013-03-01

    Full Text Available For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

  18. Creating a strategic plan for configuration management using computer aided software engineering (CASE) tools

    International Nuclear Information System (INIS)

    Smith, P.R.; Sarfaty, R.

    1993-01-01

    This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates the facility's physical configuration, design basis, and documentation. The strategic plan does not need the support of a computer aided software engineering (CASE) tool. However, the use of the CASE tool provides a methodology for consistency in approach, graphics, and database capability combined to form an encyclopedia and a method of presentation that is easily understood and aids the process of reengineering. CASE tools have much more capability than those stated above. Some examples are supporting a joint application development group (JAD) to prepare a software functional specification document and, if necessary, provide the capability to automatically generate software application code. This paper briefly discusses characteristics and capabilities of two CASE tools that use different methodologies to generate similar deliverables

  19. Finite-element model evaluation of barrier configurations to reduce infiltration into waste-disposal structures: preliminary results and design considerations

    International Nuclear Information System (INIS)

    Lu, A.H.; Phillips, S.J.; Adams, M.R.

    1982-09-01

    Barriers to reduce infiltration into waste burial disposal structures (trenches, pits, etc.) may be required to provide adequate waste confinement. The preliminary engineering design of these barriers should consider interrelated barrier performance factors. This paper summarizes preliminary computer simulation activities to further engineering barrier design efforts. Several barrier configurations were conceived and evaluated. Models were simulated for each barrier configuration using a finite element computer code. Results of this preliminary evaluation indicate that barrier configurations, depending on their morphology and materials, may significantly influence infiltration, flux, drainage, and storage of water through and within waste disposal structures. 9 figures

  20. Career choice in engineering students: its relationship with motivation, satisfaction and the development of professional plans

    Directory of Open Access Journals (Sweden)

    Iciar Pablo-Lerchundi

    2015-01-01

    Full Text Available Choosing a university degree is a relevant process for the personal, social and economic development. This study was designed to explore the students' choice for technical degrees. It is centered on the relationship between the quality of their choice and their motivation, satisfaction and development of professional plans. The inquiry involved an incidental sample of 89 students from the Universidad Politécnica de Madrid (UPM in Architecture, Computer Sciences and Forestry Engineering. After the analysis of the ad hoc adapted inventory, descriptive data and the results concerning dependence between the variables considered (analyzed with Pearson's chi-squared test are presented. Non-parametric tests were used to asses differences on satisfaction by gender and degree studied. Results show dependence between the students' motivation and satisfaction, and the later and their professional plans' content. Gender and degree are also dependent with professional plans' temporality, as well as degree with their structure. No significant differences were found for the means in satisfaction.

  1. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  2. Planning required in the development of radiation protection guidance for underground engineering applications

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R H [U.S. Public Health Service, Rockville, MD (United States)

    1969-07-01

    The potential variety of engineering applications from the peaceful uses of underground nuclear explosives indicates an increased need for applicable radiation protection guidance to protect the public health of potentially exposed populations. To insure the orderly development of such uses, additional operational data as well as bioeffects data will be required to develop appropriate criteria and guidance to inform health officials and the public of the significance of possible exposures. The required planning includes an evaluation of the potential benefits and risks as well as the size and age of population, multiplicity of sources, likely and unlikely future uses, and the total environmental impact. (author)

  3. Planning required in the development of radiation protection guidance for underground engineering applications

    International Nuclear Information System (INIS)

    Neill, R.H.

    1969-01-01

    The potential variety of engineering applications from the peaceful uses of underground nuclear explosives indicates an increased need for applicable radiation protection guidance to protect the public health of potentially exposed populations. To insure the orderly development of such uses, additional operational data as well as bioeffects data will be required to develop appropriate criteria and guidance to inform health officials and the public of the significance of possible exposures. The required planning includes an evaluation of the potential benefits and risks as well as the size and age of population, multiplicity of sources, likely and unlikely future uses, and the total environmental impact. (author)

  4. Preliminary summary of the ETF conceptual studies

    Science.gov (United States)

    Seikel, G. R.; Bercaw, R. W.; Pearson, C. V.; Owens, W. R.

    1978-01-01

    Power plant studies have shown the attractiveness of MHD topped steam power plants for baseload utility applications. To realize these advantages, a three-phase development program was initiated. In the first phase, the engineering data and experience were developed for the design and construction of a pilot plant, the Engineering Test Facility (ETF). Results of the ETF studies are reviewed. These three parallel independent studies were conducted by industrial teams led by the AVCO Everett Research Laboratory, the General Electric Corporation, and the Westinghouse Corporation. A preliminary analysis and the status of the critical evaluation of these results are presented.

  5. Preliminary cost estimating for the nuclear industry

    International Nuclear Information System (INIS)

    Klumpar, I.V.; Soltz, K.M.

    1985-01-01

    The nuclear industry has higher costs for personnel, equipment, construction, and engineering than conventional industry, which means that cost estimation procedures may need adjustment. The authors account for the special technical and labor requirements of the nuclear industry in making adjustments to equipment and installation cost estimations. Using illustrative examples, they show that conventional methods of preliminary cost estimation are flexible enough for application to emerging industries if their cost structure is similar to that of the process industries. If not, modifications can provide enough engineering and cost data for a statistical analysis. 9 references, 14 figures, 4 tables

  6. Engineering task plan for the development of a high pressure water drill system for BY-105 saltwell screen installation

    International Nuclear Information System (INIS)

    RITTER, G.A.

    1999-01-01

    This engineering task plan identifies the activities required for developing an ultra high pressure water drill system for installation of a saltwell screen in Tank BY-105. A water drill system is needed to bore through the hard waste material in this tank because of the addition of Portland cement in the 1960s and/or 1970s. The activities identified in this plan include the design, procurement, and qualification testing of the water drill along with readiness preparations including developing operating procedures, training Operations personnel, and conducting an assessment of readiness

  7. Rehabilitation Engineering: What is Rehabilitation Engineering?

    Science.gov (United States)

    ... Corner Strategic Plan Budget Advisory Council Staff Directory Careers History Visitor Information You are here Home » Science Education » Science Topics » Rehabilitation Engineering SCIENCE EDUCATION SCIENCE EDUCATION Science Topics Resource Links ...

  8. Equity in transportation: new approach in transport planningpreliminary results of case study in Cracow

    Directory of Open Access Journals (Sweden)

    Lidia ZAKOWSKA

    2014-09-01

    Full Text Available The goal of the paper is to present the concept of equity as a new approach in transport and land-use planning. This concept is consistent with the objectives of sustainable development and it is becoming more common in European and world literature. Understanding the idea of equity in the context of the transport system development is very important in creating sustainable cities and regions without discriminating any social groups and creating a cohesive society not exposed to social exclusion due to lack of access to primary and secondary activities. The paper presents some results of the preliminary analysis on transport equity in Cracow. The basic equity level which has been considered here concerns senior citizens, older people living in Cracow area, in terms of their accessibility to transport infrastructure. Taking into account living conditions of elderly pedestrians, contour measures were used, in order to determine accessibility as equity indicator.

  9. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  10. Corporate plan 1989

    International Nuclear Information System (INIS)

    1988-12-01

    The paper presents the United Kingdom Science and Engineering Research Council's second Corporate Plan 1989. The Corporate Plan comprises statements of the current objectives of the Astronomy and Planetary Science Board, the Engineering Board, the Nuclear Physics Board, the Atmospheric Sciences and Computing Centre, along with a discussion of the mechanisms for their attainment. The Annex contains a description of some scientific highlights between 1985-1989, as well as a review of progress between 1984-5 to 1987-8. (U.K.)

  11. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  12. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  13. TMI-2 containment decontamination plans

    International Nuclear Information System (INIS)

    McDougall, F.

    1980-01-01

    Because of other priorities such as reentry, purging, and recovery, containment decontamination is only in the preliminary planning stages. This paper summarizes the study with emphasis on the remote decontamination techniques

  14. Preliminary design studies on the Broad Application Test Reactor

    International Nuclear Information System (INIS)

    Terry, W.J.; Terry, W.K.; Ryskamp, J.M.; Jahshan, S.N.; Fletcher, C.D.; Moore, R.L.; Leyse, C.F.; Ottewitte, E.H.; Motloch, C.G.; Lacy, J.M.

    1992-08-01

    This report describes progress made at the Idaho National Engineering Laboratory during the first three quarters of Fiscal Year (FY) 1992 on the Laboratory-Directed Research and Development (LDRD) project to perform preliminary design studies on the Broad Application Test Reactor (BATR). This work builds on the FY-92 BATR studies, which identified anticipated mission and safety requirements for BATR and assessed a variety of reactor concepts for their potential capability to meet those requirements. The main accomplishment of the FY-92 BATR program is the development of baseline reactor configurations for the two conventional conceptual test reactors recommended in the FY-91 report. Much of the present report consists of descriptions and neutronics and thermohydraulics analyses of these baseline configurations. In addition, we considered reactor safety issues, compared the consequences of steam explosions for alternative conventional fuel types, explored a Molten Chloride Fast Reactor concept as an alternate BATR design, and examined strategies for the reduction of operating costs. Work planned for the last quarter of FY-92 is discussed, and recommendations for future work are also presented

  15. Institute of Industrial Engineers Asian Conference 2013

    CERN Document Server

    Tsao, Yu-Chung; Lin, Shi-Woei

    2013-01-01

    This book is based on the research papers presented during The Institute of Industrial Engineers Asian Conference 2013 held at Taipei in July 2013. It presents information on the most recent and relevant research, theories and practices in industrial and systems engineering. Key topics include: Engineering and Technology Management Engineering Economy and Cost Analysis Engineering Education and Training Facilities Planning and Management Global Manufacturing and Management Human Factors Industrial & Systems Engineering Education Information Processing and Engineering Intelligent Systems Manufacturing Systems Operations Research Production Planning and Control Project Management Quality Control and Management Reliability and Maintenance Engineering Safety, Security and Risk Management Supply Chain Management Systems Modeling and Simulation Large scale complex systems.

  16. Engineering task plan for Tanks 241-AN-103, 104, 105 color video camera systems

    International Nuclear Information System (INIS)

    Kohlman, E.H.

    1994-01-01

    This Engineering Task Plan (ETP) describes the design, fabrication, assembly, and installation of the video camera systems into the vapor space within tanks 241-AN-103, 104, and 105. The one camera remotely operated color video systems will be used to observe and record the activities within the vapor space. Activities may include but are not limited to core sampling, auger activities, crust layer examination, monitoring of equipment installation/removal, and any other activities. The objective of this task is to provide a single camera system in each of the tanks for the Flammable Gas Tank Safety Program

  17. Environmental Survey preliminary report, Princeton Plasma Physics Laboratory, Princeton, New Jersey

    International Nuclear Information System (INIS)

    1989-05-01

    This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Princeton Plasma Physics Laboratory (PPPL), conducted June 13 through 17, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team members are being provided by private contractors. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with PPPL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at PPPL, and interviews with site personnel. The Survey team developed a Sampling and Analysis (S ampersand A) Plan to assist in further assessing certain of the environment problems identified during its on-site activities. The S ampersand A plan is being developed by the Idaho National Engineering Laboratory. When completed, the S ampersand A results will be incorporated into the PPPL Survey findings for inclusion in the Environmental Survey Summary Report. 70 refs., 17 figs., 21 tabs

  18. Power systems engineering and mathematics

    CERN Document Server

    Knight, U G

    1972-01-01

    Power Systems Engineering and Mathematics investigates the application of mathematical aids, particularly the techniques of resource planning, to some of the technical-economic problems of power systems engineering. Topics covered include the process of engineering design and the use of computers in system design and operation; power system planning and operation; time scales and computation in system operation; and load prediction and generation capacity. This volume is comprised of 13 chapters and begins by outlining the stages in the synthesis of designs (or operating states) for engineerin

  19. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results; Impact des changements climatiques sur les plans de gestion des reservoirs Saint-Francois et Aylmer : resultats preliminaires

    Energy Technology Data Exchange (ETDEWEB)

    Turcotte, R; Fortin, L G; Pugin, S; Cyr, J F; Picard, F; Poirier, C; Lacombe, P [Centre d' Expertise Hydrique du Quebec, Quebec, PQ (Canada). Service de la Securite des Barrages; Chaumont, D; Desrochers, G; Vescovi, L; Roy, R [Ouranos, Montreal, PQ (Canada)

    2004-09-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs.

  20. Impact of climate changes on management plans for the St. Francois and Aylmer reservoirs : preliminary results; Impact des changements climatiques sur les plans de gestion des reservoirs Saint-Francois et Aylmer : resultats preliminaires

    Energy Technology Data Exchange (ETDEWEB)

    Turcotte, R.; Fortin, L.G.; Pugin, S.; Cyr, J.F.; Picard, F.; Poirier, C.; Lacombe, P. [Centre d' Expertise Hydrique du Quebec, Quebec, PQ (Canada). Service de la Securite des Barrages; Chaumont, D.; Desrochers, G.; Vescovi, L.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2004-09-01

    Dams used for flood control, water supply, recreational activities and hydroelectricity in the province of Quebec are managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). This paper addressed the issue of global warming and the changes that may occur in the hydrological regime within the next decades in response to predicted changes in climate. As a result of the changes in hydrological regime, there is a risk of losing the equilibrium between various objectives, identifiable through water management plans. The CEHQ is conducting a pilot study for the Saint-Francois and Aylmer reservoirs in order to develop a method to evaluate the adaptability of current management plans to climate change. The project is based on potential climate change scenarios as well as on deterministic and distributed hydrological models. Daily time steps are used to evaluate the hydrological impacts of climate change. CEHQ has developed a model that simulates the use of current management plans. The model makes it possible to evaluate and compare the occurrences where stream flows and water levels exceed critical values. The effectiveness of the management plans in both current and climate change scenarios can thereby be evaluated. Preliminary results suggest a possible increase in flood risk and fewer low water level occurrences. 18 refs., 4 tabs., 12 figs.

  1. Expectations of a business rescue plan: international directives for ...

    African Journals Online (AJOL)

    Expectations of a business rescue plan: international directives for Chapter 6 implementation. ... AFRICAN JOURNALS ONLINE (AJOL) · Journals · Advanced Search ... Preliminary analysis of business rescue plans suggested that a significant ...

  2. Knowledge-based decision support for Space Station assembly sequence planning

    Science.gov (United States)

    1991-04-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  3. Installation Restoration Program. Preliminary Assessment: 143rd Tactical Airlift Group, Rhode Island Air National Guard, Quonset State Airport, North Kingstown, Rhode Island

    Science.gov (United States)

    1990-06-01

    portions of the master plan and preliminary engineering for a new international airport for Lisbon, Portugal , estimated to cost $250 million. Self... sinES awtuc, SiC,9 @, Sta. 0.4.. Loc.’ el v t tim w . made weet of 66 water to. dril Sl thr0 g concrete.~ oa~~ 4.80 L0051 1.450, a. Di caes"J @tknwe...8217:par-i SI17. lilt)*~ fir, Sai~d. irav nir 1 ,l 111.-li 1s -w-i-l, a 6-Inch lent, Of coals ,- t. tint SANUI. li1tle Silt l(ll) GFIAPNhf SISCCULI/ O REMAR

  4. Grid-connected ICES: preliminary feasibility analysis and evaluation. Volume 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-30

    The HEAL Complex in New Orleans will serve as a Demonstration Community for which the ICES Demonstration System will be designed. The complex is a group of hospitals, clinics, research facilities, and medical educational facilities. The five tasks reported on are: preliminary energy analysis; preliminary institutional assessment; conceptual design; firming-up of commitments; and detailed work management plan.

  5. Design study of RL10 derivatives. Volume 3, part 2: Operational and flight support plan. [analysis of transportation requirements for rocket engine in support of space tug program

    Science.gov (United States)

    Shubert, W. C.

    1973-01-01

    Transportation requirements are considered during the engine design layout reviews and maintenance engineering analyses. Where designs cannot be influenced to avoid transportation problems, the transportation representative is advised of the problems permitting remedies early in the program. The transportation representative will monitor and be involved in the shipment of development engine and GSE hardware between FRDC and vehicle manufacturing plant and thereby will be provided an early evaluation of the transportation plans, methods and procedures to be used in the space tug support program. Unanticipated problems discovered in the shipment of development hardware will be known early enough to permit changes in packaging designs and transportation plans before the start of production hardware and engine shipments. All conventional transport media can be used for the movement of space tug engines. However, truck transport is recommended for ready availability, variety of routes, short transit time, and low cost.

  6. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  7. On teaching software engineering based on formal techniques

    DEFF Research Database (Denmark)

    Bjørner, Dines

    2001-01-01

    thoughts about and plans for a different software engineering text book peter Lucas Farewell Symposium......thoughts about and plans for a different software engineering text book peter Lucas Farewell Symposium...

  8. Software engineering

    CERN Document Server

    Sommerville, Ian

    2010-01-01

    The ninth edition of Software Engineering presents a broad perspective of software engineering, focusing on the processes and techniques fundamental to the creation of reliable, software systems. Increased coverage of agile methods and software reuse, along with coverage of 'traditional' plan-driven software engineering, gives readers the most up-to-date view of the field currently available. Practical case studies, a full set of easy-to-access supplements, and extensive web resources make teaching the course easier than ever.

  9. Plans for characterization of the potential geologic repository site at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Dobson, D.C.; Blanchard, M.B.; Voegele, M.D.; Younker, J.L.

    1990-01-01

    Site investigations in the vicinity of the potential repository site at Yucca Mountain, Nevada, have occurred for many years. Although information from previous site investigations was adequate to support preliminary evaluations by the US Department of Energy (DOE) in the Environmental Assessment and to develop conceptual repository and waste package designs, this information is insufficient to proceed to the advanced designs and performance assessments required for the license application to the US Nuclear Regulatory Commission (NRC). Therefore, intensive site characterization is planned, as described in the December 1988 Site Characterization Plan (SCP). The data acquisition activities described in the SCP are focused on obtaining information to allow evaluations of the natural and engineered barriers considered potentially relevant to repository performance. The site data base must be adequate to allow predictions of the range of expected variation in geologic conditions over the next 10,000 years, as well as predictions of the probabilities for catastrophic geologic events that could affect repository performance. 4 refs., 4 figs

  10. Preliminary test results for post irradiation examination on the HTTR fuel

    International Nuclear Information System (INIS)

    Ueta, Shohei; Umeda, Masayuki; Sawa, Kazuhiro; Sozawa, Shizuo; Shimizu, Michio; Ishigaki, Yoshinobu; Obata, Hiroyuki

    2007-01-01

    The future post-irradiation program for the first-loading fuel of the HTTR is scheduled using the HTTR fuel handling facilities and the Hot Laboratory in the Japan Materials Testing Reactor (JMTR) to confirm its irradiation resistance and to obtain data on its irradiation characteristics in the core. This report describes the preliminary test results and the future plan for a post-irradiation examination for the HTTR fuel. In the preliminary test, fuel compacts made with the same SiC-coated fuel particle as the first loading fuel were used. In the preliminary test, dimension, weight, fuel failure fraction, and burnup were measured, and X-ray radiograph, SEM, and EPMA observations were carried out. Finally, it was confirmed that the first-loading fuel of the HTTR showed good quality under an irradiation condition. The future plan for the post-irradiation tests was described to confirm its irradiation performance and to obtain data on its irradiation characteristics in the HTTR core. (author)

  11. Prototype Engineered Barrier System Field Tests (PEBSFT)

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Wilder, D.G.

    1991-02-01

    This progress report presents the interpretation of data obtained (up to November 1, 1988) from the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed for the Yucca Mountain Project (YMP) in G-Tunnel within the Nevada Test site. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for the field tests for future investigations that will be conducted in the Exploratory Shaft Facilities, at a potential high-level radioactive waste repository site in Yucca Mountain. The primary objective of the tests is to provide the basis for determining whether tests planned for Yucca Mountain have the potential to be successful. Thirteen chapters discuss the following: mapping the electromagnetic permittivity and attenuation rate of the rock mass; changes in moisture content detected by the neutron logging probe; characterization of the in-situ permeability of the fractured tuff around the heater borehole; electrical resistance heater installed in a 30-cm borehole; relative humidity measurements; the operation, design, construction, calibration, and installation of a microwave circuit that might provide partial pressure information at temperatures in excess of 200 degree C (392 degree F); pressure and temperature measurements in the G-Tunnel; the moisture collection system, which attempts to collect steam that migrates into the heater borehole; The borehole television and borescope surveys that were performed to map the location, orientation, and aperture of the fractures intersecting the boreholes; preliminary scoping calculations of the hydrothermal conditions expected for this prototype test; the Data Acquisition System; and the results of the PEBSFT, preliminary interpretations of these results, and plans for the remainder of the test. Chapters have been indexed separately for inclusion on the data base

  12. Radon concentrations in Norwegian kindergartens: survey planning and preliminary results

    International Nuclear Information System (INIS)

    Birovljev, A.; Strand, T.; Heiberg, A.

    1998-01-01

    An extensive radon survey in Norwegian kindergartens and schools was started in early 1997; so far 2481 kindergartens were examined. Preliminary results of the first phase of the survey are presented in tabular and graphic form including, among others, the dependence of average radon concentration on the construction year of the kindergartens and on the age of the buildings. (A.K.)

  13. Detroit Diesel Engine Technology for Light Duty Truck Applications - DELTA Engine Update

    Energy Technology Data Exchange (ETDEWEB)

    Freese, Charlie

    2000-08-20

    The early generation of the DELTA engine has been thoroughly tested and characterized in the virtual lab, during engine dynamometer testing, and on light duty trucks for personal transportation. This paper provides an up-to-date account of program findings. Further, the next generation engine design and future program plans will be briefly presented.

  14. Robust economic optimization and environmental policy analysis for microgrid planning: An application to Taichung Industrial Park, Taiwan

    International Nuclear Information System (INIS)

    Yu, Nan; Kang, Jin-Su; Chang, Chung-Chuan; Lee, Tai-Yong; Lee, Dong-Yup

    2016-01-01

    This study aims to provide economical and environmentally friendly solutions for a microgrid system with distributed energy resources in the design stage, considering multiple uncertainties during operation and conflicting interests among diverse microgrid stakeholders. For the purpose, we develop a multi-objective optimization model for robust microgrid planning, on the basis of an economic robustness measure, i.e. the worst-case cost among possible scenarios, to reduce the variability among scenario costs caused by uncertainties. The efficacy of the model is successfully demonstrated by applying it to Taichung Industrial Park in Taiwan, an industrial complex, where significant amount of greenhouse gases are emitted. Our findings show that the most robust solution, but the highest cost, mainly includes 45% (26.8 MW) of gas engine and 47% (28 MW) of photovoltaic panel with the highest system capacity (59 MW). Further analyses reveal the environmental benefits from the significant reduction of the expected annual CO_2 emission and carbon tax by about half of the current utility facilities in the region. In conclusion, the developed model provides an efficient decision-making tool for robust microgrid planning at the preliminary stage. - Highlights: • Developed robust economic and environmental optimization model for microgrid planning. • Provided Pareto optimal planning solutions for Taichung Industrial Park, Taiwan. • Suggested microgrid configuration with significant economic and environmental benefits. • Identified gas engine and photovoltaic panel as two promising energy sources.

  15. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  16. The proposed human factors engineering program plan for man-machine interface system design of the next generation NPP in Korea

    International Nuclear Information System (INIS)

    Oh, I.S.; Lee, H.C.; Seo, S.M.; Cheon, S.W.; Park, K.O.; Lee, J.W.; Sim, B.S.

    1994-01-01

    Human factors application to nuclear power plant (NPP) design, especially, to man-machine interface system (MMIS) design becomes an important issue among the licensing requirements. Recently, the nuclear regulatory bodies require the evidence of systematic human factors application to the MMIS design. Human Factors Engineering Program Plan (HFEPP), as a basis and central one among the human factors application by the MMIS designers. This paper describes the framework of HFEPP for the MMIS design of next generation NPP (NG-NPP) in Korea. This framework provides an integral plan and some bases of the systematic application of human factors to the MMIS design, and consists of purpose and scope, codes and standards, human factors organization, human factors tasks, engineering control methodology, human factors documentations, and milestones. The proposed HFEPP is a top level document to define and describe human factors tasks, based on each step of MMIS design process, in view point of how, what, when and by whom to be performed. (author). 11 refs, 1 fig

  17. Notion Of Artificial Labs Slow Global Warming And Advancing Engine Studies Perspectives On A Computational Experiment On Dual-Fuel Compression-Ignition Engine Research

    Directory of Open Access Journals (Sweden)

    Tonye K. Jack

    2017-06-01

    Full Text Available To appreciate clean energy applications of the dual-fuel internal combustion engine D-FICE with pilot Diesel fuel to aid public policy formulation in terms of present and future benefits to the modern transportation stationary power and promotion of oil and gas green- drilling the brief to an engine research team was to investigate the feasible advantages of dual-fuel compression-ignition engines guided by the following concerns i Sustainable fuel and engine power delivery ii The requirements for fuel flexibility iii Low exhausts emissions and environmental pollution iv Achieving low specific fuel consumption and economy for maximum power v The comparative advantages over the conventional Diesel engines vi Thermo-economic modeling and analysis for the optimal blend as basis for a benefitcost evaluation Planned in two stages for reduced cost and fast turnaround of results - initial preliminary stage with basic simple models and advanced stage with more detailed complex modeling. The paper describes a simplified MATLAB based computational experiment predictive model for the thermodynamic combustion and engine performance analysis of dual-fuel compression-ignition engine studies operating on the theoretical limited-pressure cycle with several alternative fuel-blends. Environmental implications for extreme temperature moderation are considered by finite-time thermodynamic modeling for maximum power with predictions for pollutants formation and control by reaction rates kinetics analysis of systematic reduced plausible coupled chemistry models through the NCN reaction pathway for the gas-phase reactions classes of interest. Controllable variables for engine-out pollutants emissions reduction and in particular NOx elimination are identified. Verifications and Validations VampV through Performance Comparisons were made using a clinical approach in selection of StrokeBore ratios greater-than and equal-to one amp88051 low-to-high engine speeds and medium

  18. A preliminary parametric performance assessment for the disposal of alpha-contaminated mixed low-level waste stored at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Smith, T.H.; Anderson, G.L.; Myers, J.

    1995-01-01

    A preliminary parametric performance assessment (PA) has been performed of potential waste disposal systems for alpha-contaminated mixed low-level waste (ALLW) currently stored at the Idaho National Engineering Laboratory. The radionuclide-confinement performance of treated ALLW in various final waste forms, in various disposal locations, and under various assumptions was evaluated. Compliance with performance objectives was assessed for the undisturbed waste scenario and for intrusion scenarios. Some combinations of final waste form, disposal site, and environmental transport assumptions lead to calculated does that comply with the performance objectives, while others do not. The results will help determine the optimum degree of ALLW immobilization to satisfy the performance objectives while minimizing cost

  19. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  20. C-018H Pre-Operational Baseline Sampling Plan

    International Nuclear Information System (INIS)

    Guzek, S.J.

    1993-01-01

    The objective of this task is to field characterize and sample the soil at selected locations along the proposed effluent line routes for Project C-018H. The overall purpose of this effort is to meet the proposed plan to discontinue the disposal of contaminated liquids into the Hanford soil column as described by DOE (1987). Detailed information describing proposed transport pipeline route and associated Kaiser Engineers Hanford Company (KEH) preliminary drawings (H288746...755) all inclusive, have been prepared by KEH (1992). The information developed from field monitoring and sampling will be utilized to characterize surface and subsurface soil along the proposed C-018H effluent pipeline and it's associated facilities. Potentially existing contaminant levels may be encountered therefore, soil characterization will provide a construction preoperational baseline reference, develop personnel safety requirements, and determine the need for any changes in the proposed routes prior to construction of the pipeline

  1. Stirling engine design manual

    Science.gov (United States)

    Martini, W. R.

    1978-01-01

    This manual is intended to serve both as an introduction to Stirling engine analysis methods and as a key to the open literature on Stirling engines. Over 800 references are listed and these are cross referenced by date of publication, author and subject. Engine analysis is treated starting from elementary principles and working through cycles analysis. Analysis methodologies are classified as first, second or third order depending upon degree of complexity and probable application; first order for preliminary engine studies, second order for performance prediction and engine optimization, and third order for detailed hardware evaluation and engine research. A few comparisons between theory and experiment are made. A second order design procedure is documented step by step with calculation sheets and a worked out example to follow. Current high power engines are briefly described and a directory of companies and individuals who are active in Stirling engine development is included. Much remains to be done. Some of the more complicated and potentially very useful design procedures are now only referred to. Future support will enable a more thorough job of comparing all available design procedures against experimental data which should soon be available.

  2. Preliminary evaluation of crisis-relocation fallout-shelter options. Volume 2. Detailed analysis

    International Nuclear Information System (INIS)

    Santini, D.J.; Clinch, J.M.; Davis, F.H.; Hill, L.G.; Lynch, E.P.; Tanzman, E.A.; Wernette, D.R.

    1982-12-01

    This report presents a preliminary, detailed evaluation of various shelter options for use if the President orders crisis relocation of the US urban population because of strong expectation of a nuclear war. The availability of livable shelter space at 40 ft 2 per person (congregate-care space) by state is evaluated. Options are evaluated for construction of fallout shelters allowing 10 ft 2 per person - such shelters are designed to provide 100% survival at projected levels of radioactive fallout. The FEMA concept of upgrading existing buildings to act as fallout shelters can, in principle, provide adequate shelter throughout most of the US. Exceptions are noted and remedies proposed. In terms of upgrading existing buildings to fallout shelter status, great benefits are possible by turning away from a standard national approach and adopting a more site-specific approach. Existing FEMA research provides a solid foundation for successful crisis relocation planning, but the program can be refined by making suitable modifications in its locational, engineering, and institutionally specific elements

  3. Preliminary report on the environmnetal geology of the Islamabad-Rawalpindi area, Pakistan

    International Nuclear Information System (INIS)

    Williams, V.S.; Sheikh, I.; Pasha, M.K.; Khan, K.S.A.; Reza, Q.

    1994-01-01

    Islamabad, the capital of Pakistan, is a planned city constructed since about 1960 at the foot of the Margala hills just north of the old city of Rawalpindi. Since then, rapid growth of both Islamabad and Rawalpindi to a combined population of about 1.3 million has caused ever increasing demands for natural resources and adverse effects on the environment. To maintain the quality of the capital, municipal authorities need information on the physical environment to guide future development. Environment concerns include (1) availability of building materials, (2) environmental degradation from extraction and processing of building materials, (3) availability of surface and ground water (4) pollution of water by waste disposal, (5) geological hazards, and (6) engineering characteristics of soil ad rock. This preliminary report summarizes information on the environmental geology of the Islamabad-Rawalpindi area. The information has been collected by a cooperative project of the geological Survey of Pakistan and the U.S. Geological Survey, supported by the United States Agency for International Development. (author)

  4. Preliminary investigation of the 317 Area, ANL-E

    International Nuclear Information System (INIS)

    Wescott, J.; Moos, L.; Remeikis, A.

    1995-01-01

    The 317 Area at Argonne National Laboratory-East (ANL-E) is scheduled to undergo a Resource Conservation and Recovery Act (RCRA) Facility Investigation, Act or RFI. Prior to the formal RFI, a voluntary, preliminary characterization of the 317 Area was conducted by ANL-E. The characterization results were used to formulate the RFI work plan and provided a better focus for the formal investigation. This site presents a difficult engineering challenge. The nature of the waste disposed at this site in the past includes both liquid chemicals and radioactive waste. The 317 Area is classified as a radiologically controlled area because of operations currently performed there. Present Department of Energy policy stipulates that waste material from such an area must be considered radioactive. The possible presence of hazardous constituents in the soil and groundwater would require the investigation-derived waste generated at the site be disposed as radioactive mixed waste. Besides the nature of the waste possibly contaminating this site, the geology of the site poses an equally enigmatic situation. The ANL-E site is located in a region of recessional glacial moraine deposits

  5. Personal strategic planning mobile application: preliminary study ...

    African Journals Online (AJOL)

    With the recent advances in the capabilities of smartphones and their growing penetration rate among the individuals, it is possible to take advantage of these devices to design a mobile application to promote personal strategic planning. The paper reviews relevant literature and designs an instrument to investigate the ...

  6. Preliminary Results from Simulations of Temperature Oscillations in Stirling Engine Regenerator Matrices

    DEFF Research Database (Denmark)

    Andersen, Stig Kildegård; Carlsen, Henrik; Thomsen, Per Grove

    2006-01-01

    The objective of this study has been to create a Stirling engine model for studying the effects of regenerator matrix temperature oscillations on Stirling engine performance. A one-dimensional model with axial discretisation of engine components has been formulated using the control volume method...

  7. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  8. An Engineering Degree Does Not (Necessarily) an Engineer Make: Career Decision Making among Undergraduate Engineering Majors. Research Brief

    Science.gov (United States)

    Lichtenstein, Gary; Loshbaugh, Heidi G.; Claar, Brittany; Chen, Helen L.; Jackson, Kristyn; Sheppard, Sheri

    2009-01-01

    This paper explores the career-related decision making of seniors enrolled in undergraduate engineering programs at two nationally recognized institutions. This strand of the Academic Pathways Study (APS) research revealed that many engineering students were undecided about their career plans, even late into their senior years and that many were…

  9. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  10. Engineering task plan for flammable gas atmosphere mobile color video camera systems

    International Nuclear Information System (INIS)

    Kohlman, E.H.

    1995-01-01

    This Engineering Task Plan (ETP) describes the design, fabrication, assembly, and testing of the mobile video camera systems. The color video camera systems will be used to observe and record the activities within the vapor space of a tank on a limited exposure basis. The units will be fully mobile and designed for operation in the single-shell flammable gas producing tanks. The objective of this tank is to provide two mobile camera systems for use in flammable gas producing single-shell tanks (SSTs) for the Flammable Gas Tank Safety Program. The camera systems will provide observation, video recording, and monitoring of the activities that occur in the vapor space of applied tanks. The camera systems will be designed to be totally mobile, capable of deployment up to 6.1 meters into a 4 inch (minimum) riser

  11. 76 FR 36410 - Value Engineering

    Science.gov (United States)

    2011-06-22

    ...-2011-0046] RIN 2125-AF40 Value Engineering AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... regulations to enhance the integration of value engineering (VE) analysis in the planning and development of...-131 on Value Engineering. These revisions will also address certain findings contained in a 2007...

  12. An overview of the NASA rotary engine research program

    Science.gov (United States)

    Meng, P. R.; Hady, W. F.

    1984-01-01

    A brief overview and technical highlights of the research efforts and studies on rotary engines over the last several years at the NASA Lewis Research Center are presented. The test results obtained from turbocharged rotary engines and preliminary results from a high performance single rotor engine were discussed. Combustion modeling studies of the rotary engine and the use of a Laser Doppler Velocimeter to confirm the studies were examined. An in-house program in which a turbocharged rotary engine was installed in a Cessna Skymaster for ground test studies was reviewed. Details are presented on single rotor stratified charge rotary engine research efforts, both in-house and on contract.

  13. High Pressure Reverse Flow APS Engine

    Science.gov (United States)

    Senneff, J. M.

    1972-01-01

    A design and test demonstration effort was undertaken to evaluate the concept of the reverse flow engine for the APS engine application. The 1500 lb (6672 N) thrust engine was designed to operate on gaseous hydrogen and gaseous oxygen propellants at a mixture ratio of 4 and to achieve the objective performance of 435 sec (4266 Nsec/kg) specific impulse. Superimposed durability requirements called for a million-cycle capability with 50 hours duration. The program was undertaken as a series of tasks including the initial preliminary design, design of critical test components and finally, the design and demonstration of an altitude engine which could be used interchangeably to examine operating parameters as well as to demonstrate the capability of the concept. The program results are reported with data to indicate that all of the program objectives were met or exceeded within the course of testing on the program. The analysis effort undertaken is also reported in detail and supplemented with test data in some cases where prior definitions could not be made. The results are contained of these analyses as well as the test results conducted throughout the course of the program. Finally, the test data and analytical results were combined to allow recommendations for a flight weight design. This preliminary design effort is also detailed.

  14. Key Future Engineering Capabilities for Human Capital Retention

    Science.gov (United States)

    Sivich, Lorrie

    Projected record retirements of Baby Boomer generation engineers have been predicted to result in significant losses of mission-critical knowledge in space, national security, and future scientific ventures vital to high-technology corporations. No comprehensive review or analysis of engineering capabilities has been performed to identify threats related to the specific loss of mission-critical knowledge posed by the increasing retirement of tenured engineers. Archival data from a single diversified Fortune 500 aerospace manufacturing engineering company's engineering career database were analyzed to ascertain whether relationships linking future engineering capabilities, engineering disciplines, and years of engineering experience could be identified to define critical knowledge transfer models. Chi square, logistic, and linear regression analyses were used to map patterns of discipline-specific, mission-critical knowledge using archival data of engineers' perceptions of engineering capabilities, key developmental experiences, and knowledge learned from their engineering careers. The results from the study were used to document key engineering future capabilities. The results were then used to develop a proposed human capital retention plan to address specific key knowledge gaps of younger engineers as veteran engineers retire. The potential for social change from this study involves informing leaders of aerospace engineering corporations on how to build better quality mentoring or succession plans to fill the void of lost knowledge from retiring engineers. This plan can secure mission-critical knowledge for younger engineers for current and future product development and increased global competitiveness in the technology market.

  15. Medical Audit: A Nigerian Teaching Hospital's Preliminary Experience

    African Journals Online (AJOL)

    The definition, historical background, aims dimensions and the characteristics of medical audit as well as the indices to be measured in a medical audit exercise are highlighted. The preliminary experience of the University of Ilorin Teaching Hospital (UITH) in the planning, implementation and monitoring of a viable medical ...

  16. RE-1000 free-piston Stirling engine update

    Science.gov (United States)

    Schreiber, J. G.

    1985-01-01

    A free piston Stirling engine was tested. The tests performed over the past several years on the single cylinder engine were designed to investigate the dynamics of a free piston Stirling engine. The data are intended to be used primarily for computer code validation. The tests designed to investigate the sensitivity of the engine performance to variations in working space pressure, heater and cooler temperatures, regenerator porosity, power piston mass and displacer dynamics were completed. In addition, some data were recorded with alternate working fluids. A novel resonant balance system for the engine was also tested. Some preliminary test results of the tests performed are presented along with an outline of future tests to be run with the engine coupled to a hydraulic output unit. A description of the hydraulic output unit is given.

  17. Preliminary socioeconomic and community planning studies

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Goldie W; Rivkin, Malcolm D [Rivkin Associates, Bethesda, MD (United States)

    1986-07-01

    The timing of resettlement on Bikini Atoll and the nature of a master plan to guide construction of a new community depend on four critical determinants which are not yet definitively known. The Bikini Atoll Rehabilitation Committee (BARC) and its consultants have been addressing three of these: a. How long it will take to restore Bikini Island, which will be the main settlement area, to a habitable state. The methods under investigation by BARC for decontaminating the island might be considered as alternatives or, possibly in combination. They vary considerably, not only with respect to cost, but also with respect to important factors such as: - how long it will take to decontaminate the island (i.e. to reduce radiation to levels acceptable within Federal standards), - the necessity of removing existing vegetation and the time and effort needed to restore environment and vegetation to a state sufficient to support a new community at a reasonable standard of amenity, - requirements for repeated or continual application of decontamination procedures (and associated risks), and - implications for potential constraints on the lifestyle of the people who resettle on Bikini Island. b. Adequacy of water resources (groundwater and rainwater catchment potential) on Bikini and Eneu Islands to support both revegetation as necessary, and a new community. c. The likely state of the Bikini people (size of the population, location(s), living conditions, financial commitments, etc.) at the time their atoll is ready for resettlement. d. The judgment and wishes of the Bikini people regarding a community plan in light of all the foregoing factors, once they become known.

  18. Preliminary socioeconomic and community planning studies

    International Nuclear Information System (INIS)

    Rivkin, Goldie W.; Rivkin, Malcolm D.

    1986-01-01

    The timing of resettlement on Bikini Atoll and the nature of a master plan to guide construction of a new community depend on four critical determinants which are not yet definitively known. The Bikini Atoll Rehabilitation Committee (BARC) and its consultants have been addressing three of these: a. How long it will take to restore Bikini Island, which will be the main settlement area, to a habitable state. The methods under investigation by BARC for decontaminating the island might be considered as alternatives or, possibly in combination. They vary considerably, not only with respect to cost, but also with respect to important factors such as: - how long it will take to decontaminate the island (i.e. to reduce radiation to levels acceptable within Federal standards), - the necessity of removing existing vegetation and the time and effort needed to restore environment and vegetation to a state sufficient to support a new community at a reasonable standard of amenity, - requirements for repeated or continual application of decontamination procedures (and associated risks), and - implications for potential constraints on the lifestyle of the people who resettle on Bikini Island. b. Adequacy of water resources (groundwater and rainwater catchment potential) on Bikini and Eneu Islands to support both revegetation as necessary, and a new community. c. The likely state of the Bikini people (size of the population, location(s), living conditions, financial commitments, etc.) at the time their atoll is ready for resettlement. d. The judgment and wishes of the Bikini people regarding a community plan in light of all the foregoing factors, once they become known

  19. Retraining the Modern Civil Engineer.

    Science.gov (United States)

    Priscoli, Jerome Delli

    1983-01-01

    Discusses why modern engineering requires social science and the nature of planning. After these conceptional discussions, 12 practical tools which social science brings to engineering are reviewed. A tested approach to training engineers in these tools is then described. Tools include institutional analysis, policy profiling, and other impact…

  20. Preliminary design package for solar collector and solar pump

    Science.gov (United States)

    1978-01-01

    A solar-operated pump using an existing solar collector, for use on solar heating and cooling and hot water systems is described. Preliminary design criteria of the collector and solar-powered pump is given including: design drawings, verification plans, and hazard analysis.

  1. Development of a tissue-engineered human oral mucosa equivalent based on an acellular allogeneic dermal matrix: a preliminary report of clinical application to burn wounds.

    Science.gov (United States)

    Iida, Takuya; Takami, Yoshihiro; Yamaguchi, Ryo; Shimazaki, Shuji; Harii, Kiyonori

    2005-01-01

    Tissue-engineered skin equivalents composed of epidermal and dermal components have been widely investigated for coverage of full-thickness skin defects. We developed a tissue-engineered oral mucosa equivalent based on an acellular allogeneic dermal matrix and investigated its characteristics. We also tried and assessed its preliminary clinical application. Human oral mucosal keratinocytes were separated from a piece of oral mucosa and cultured in a chemically-defined medium. The keratinocytes were seeded on to the acellular allogeneic dermal matrix and cultured. Histologically, the mucosa equivalent had a well-stratified epithelial layer. Immunohistochemical study showed that it was similar to normal oral mucosa. We applied this equivalent in one case with an extensive burn wound. The equivalent was transplanted three weeks after the harvest of the patient's oral mucosa and about 30% of the graft finally survived. We conclude that this new oral mucosa equivalent could become a therapeutic option for the treatment of extensive burns.

  2. Third corporate plan September 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Science and Engineering Research Council (SERC) published its first Corporate Plan in 1985 and its second in 1989. This third plan comes at a time of considerable change for the Council. Funding is tightly constrained, with the costs of research rising. Changes in funding patterns have made the pursuit of research in the higher-education sector - where the SERC deploys much of its resource -much harder, yet major new challenges and opportunities are opening up. The refocusing of a large organisation like the SERC is not accomplished overnight and needs careful preparation. This plan is therefore an interim document describing some important decisions recently taken and the reviews now being carried out to set future priorities. A fourth plan, to be published early in 1993, will describe the outcome of this reappraisal and set a definitive path towards the end of the century. The aims for the following programmes are stated and the funding objectives stated: the science board materials commission, engineering board, astronomy and planetary science board, nuclear physics board, fellowships, central computing, repayment work administration. Corporate plan actions for the neutron facilities, nuclear structure research, particle physics, information technology, engineering and international cooperation are presented. The impact of the reused plan on the manpower requirements is discussed. (author)

  3. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  4. Career Planning Modules for the Officer Career Information and Planning System.

    Science.gov (United States)

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  5. Experience base for Radioactive Waste Thermal Processing Systems: A preliminary survey

    International Nuclear Information System (INIS)

    Mayberry, J.; Geimer, R.; Gillins, R.; Steverson, E.M.; Dalton, D.; Anderson, G.L.

    1992-04-01

    In the process of considering thermal technologies for potential treatment of the Idaho National Engineering Laboratory mixed transuranic contaminated wastes, a preliminary survey of the experience base available from Radioactive Waste Thermal Processing Systems is reported. A list of known commercial radioactive waste facilities in the United States and some international thermal treatment facilities are provided. Survey focus is upon the US Department of Energy thermal treatment facilities. A brief facility description and a preliminary summary of facility status, and problems experienced is provided for a selected subset of the DOE facilities

  6. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  7. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  8. Systems Engineering Assessment & Workforce Development Plan

    Science.gov (United States)

    2012-11-05

    Government or its technical domains. Other fields, such as culinary and healthcare, have also identified these emerging and growing issues (Calhoun...et al. (2009). "The Art and Science of Systems Engineering." Systems Research Forum 3(2): 81-100. Shenhar, A. and B. Sauser, Eds. (2009). Systems

  9. Test/QA plan for the verification testing of alternative or reformulated liquid fuels, fuel additives, fuel emulsions, and lubricants for highway and nonroad use heavy-duty diesel engines

    Science.gov (United States)

    This Environmental Technology Verification Program test/QA plan for heavy-duty diesel engine testing at the Southwest Research Institute’s Department of Emissions Research describes how the Federal Test Procedure (FTP), as listed in 40 CFR Part 86 for highway engines and 40 CFR P...

  10. Dealing with complex and ill-structured problems: results of a Plan-Do-Check-Act experiment in a business engineering semester

    Science.gov (United States)

    Riis, Jens Ove; Achenbach, Marlies; Israelsen, Poul; Kyvsgaard Hansen, Poul; Johansen, John; Deuse, Jochen

    2017-07-01

    Challenged by increased globalisation and fast technological development, we carried out an experiment in the third semester of a global business engineering programme aimed at identifying conditions for training student in dealing with complex and ill-structured problems of forming a new business. As this includes a fuzzy front end, learning cannot be measured in traditional, quantitative terms; therefore, we have explored the use of reflection to convert tacit knowledge to explicit knowledge. The experiment adopted a Plan-Do-Check-Act approach and concluded with developing a plan for new learning initiatives in the subsequent year's semester. The findings conclude that (1) problem-based learning develops more competencies than ordinarily measured at the examination, especially, the social/communication and personal competencies are developed; (2) students are capable of dealing with a complex and ambiguous problem, if properly guided. Four conditions were identified; (3) most students are not conscious of their learning, but are able to reflect if properly encouraged; and (4) improving engineering education should be considered as an organisational learning process.

  11. Engineering Design for Engineering Design: Benefits, Models, and Examples from Practice

    Science.gov (United States)

    Turner, Ken L., Jr.; Kirby, Melissa; Bober, Sue

    2016-01-01

    Engineering design, a framework for studying and solving societal problems, is a key component of STEM education. It is also the area of greatest challenge within the Next Generation Science Standards, NGSS. Many teachers feel underprepared to teach or create activities that feature engineering design, and integrating a lesson plan of core content…

  12. An Engineer Does What Now?

    Science.gov (United States)

    Gilbert, Amy; Wade, Katherine

    2014-01-01

    For an introductory engineering class at an all-girls urban high school in the Southeast, the authors planned an experience that would align with the engineering aspects of the "Next Generation Science Standards" (NGSS Lead States 2013). The goal was to better relate science, technology, engineering, and mathematics (STEM) to everyday…

  13. Explore the Role of Engineering Measurement in the Urban Planning Management%探讨城市规划管理中工程测量的作用

    Institute of Scientific and Technical Information of China (English)

    杨震

    2013-01-01

    Engineering measurement is the base work of the urban planning management, which services every project pro-cess in urban planning and construction, mainly including the design, survey, construction, monitoring, etc in the engineering construction. If there is no measurement, the urban planning c-an’t operate properly. This article elaborates the importance of measurement work in urban planning management.%工程测量是城市规划管理的基础工作,它服务于城市规划建设中的各项工程工序,主要包括工程建设中得设计、勘测、施工、监测等工作。如果没有测量工作,城市规划就无法正常运转。本文讲述了测量工作在城市规划管理工作中的重要性。

  14. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  15. Regional cooperation for emergency plan

    International Nuclear Information System (INIS)

    Chu, D.S.L.; Liu, P.C.

    1981-01-01

    It has become increasingly evident since the Three Mile Island (TMI) accident that a sound emergency plan is indispensable to the overall nuclear power generation program. In some developing countries in Eastern Aisa, the availability of manpower resources and facilities to handle a nuclear power plant accident are rather limited. Therefore, the establishment of a regional mutual emergency plan is deemed necessary. A preliminary idea concerning this establishment is presented for deliberation by this Conference

  16. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  17. Rotating Liner Engine: Improving Efficiency of Heavy Duty Diesels by Significant Friction Reduction, and Extending the Life of Heavy Duty Engines.

    Energy Technology Data Exchange (ETDEWEB)

    Dardalis, Dimitrios

    2013-12-31

    This report describes the work on converting a 4 cylinder Cummins ISB engine into a single cylinder Rotating Liner Engine functioning prototype that can be used to measure the friction benefits of rotating the cylinder liner in a high pressure compression ignition engine. A similar baseline engine was also prepared, and preliminary testing was done. Even though the fabrication of the single cylinder prototype was behind schedule due to machine shop delays, the fundamental soundness of the design elements are proven, and the engine has successfully functioned. However, the testing approach of the two engines, as envisioned by the original proposal, proved impossible due to torsional vibration resonance caused by the single active piston. A new approach for proper testing has been proposed,

  18. Preliminary design package for solar heating and hot water system

    Science.gov (United States)

    1976-01-01

    Two prototype solar heating and hot water systems for use in single-family dwellings or commercial buildings were designed. Subsystems included are: collector, storage, transport, hot water, auxiliary energy, and government-furnished site data acquisition. The systems are designed for Yosemite, California, and Pueblo, Colorado. The necessary information to evaluate the preliminary design for these solar heating and hot water systems is presented. Included are a proposed instrumentation plan, a training program, hazard analysis, preliminary design drawings, and other information about the design of the system.

  19. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  20. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  1. Human-factors engineering-control-room design review: Shoreham Nuclear Power Station. Draft audit report

    International Nuclear Information System (INIS)

    Peterson, L.R.; Preston-Smith, J.; Savage, J.W.; Rousseau, W.F.

    1981-01-01

    A human factors engineering preliminary design review of the Shoreham control room was performed at the site on March 30 through April 3, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The presented sections are numbered to conform to the guidelines of the draft version of NUREG-0700. They summarize the teams's observations of the control room design and layout, and of the control room operators' interface with the control room environment

  2. Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan

    Science.gov (United States)

    Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim

    2016-08-01

    We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case

  3. Preliminary radiological assessments of low-level waste repositories

    International Nuclear Information System (INIS)

    Nancarrow, D.J.; Sumerling, T.J.; Ashton, J.

    1988-06-01

    Preliminary assessments of the post-closure radiological impact from the disposal of low-level radioactive wastes in shallow engineered facilities at four sites are presented. This provides a framework to practice and refine a methodology that could be used, on behalf of the Department, for independent assessment of any similar proposal from Nirex. Information and methodological improvements that would be required are identified. (author)

  4. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume I. Summary, objectives and management. Revision 2

    International Nuclear Information System (INIS)

    1982-08-01

    This document defines a plan for conducting selected aspects of the engineering testing required for magnetic fusion reactor FWBS components and systems. The ultimate product of this program is an established data base that contributes to a functional, reliable, maintainable, economically attractive, and environmentally acceptable commercial fusion reactor first wall, blanket, and shield system. This program plan updates the initial plan issued in November of 1980 by the DOE/Office of Fusion Energy (unnumbered report). The plan consists of two parts. Part I is a summary of activities, responsibilities and program management including reporting and interfaces with other programs. Part II is a compilation of the Detailed Technical Plans for Phase I (1982 to 1984) developed by the participants during Phase 0 of the program

  5. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  6. Liquid xenon detector engineering

    International Nuclear Information System (INIS)

    Chen, E.; Chen, M.; Gaudreau, M.P.J.; Montgomery, D.B.; Pelly, J.D.; Shotkin, S.; Sullivan, J.D.; Sumorok, K.; Yan, X.; Zhang, X.; Lebedenko, V.

    1991-01-01

    The design, engineering constraints and R and D status of a 15 m 3 precision liquid xenon, electromagnetic calorimeter for the Superconducting Super Collider are discussed in this paper. Several prototype liquid xenon detectors have been built, and preliminary results are described. The design of a conical 7 cell by 7 cell detector capable of measuring fully contained high energy electron showers is described in detail

  7. An open-source, mobile-friendly search engine for public medical knowledge.

    Science.gov (United States)

    Samwald, Matthias; Hanbury, Allan

    2014-01-01

    The World Wide Web has become an important source of information for medical practitioners. To complement the capabilities of currently available web search engines we developed FindMeEvidence, an open-source, mobile-friendly medical search engine. In a preliminary evaluation, the quality of results from FindMeEvidence proved to be competitive with those from TRIP Database, an established, closed-source search engine for evidence-based medicine.

  8. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  9. Preliminary results on performance testing of a turbocharged rotary combustion engine

    Science.gov (United States)

    Meng, P. R.; Rice, W. J.; Schock, H. J.; Pringle, D. P.

    1982-01-01

    The performance of a turbocharged rotary engine at power levels above 75 kW (100 hp) was studied. A twin rotor turbocharged Mazda engine was tested at speeds of 3000 to 6000 rpm and boost pressures to 7 psi. The NASA developed combustion diagnostic instrumentation was used to quantify indicated and pumping mean effect pressures, peak pressure, and face to face variability on a cycle by cycle basis. Results of this testing showed that a 5900 rpm a 36 percent increase in power was obtained by operating the engine in the turbocharged configuration. When operating with lean carburetor jets at 105 hp (78.3 kW) and 4000 rpm, a brake specific fuel consumption of 0.45 lbm/lb-hr was measured.

  10. CDMA systems capacity engineering

    CERN Document Server

    Kim, Kiseon

    2004-01-01

    This new hands-on resource tackles capacity planning and engineering issues that are crucial to optimizing wireless communication systems performance. Going beyond the system physical level and investigating CDMA system capacity at the service level, this volume is the single-source for engineering and analyzing systems capacity and resources.

  11. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  12. Validation of GPU based TomoTherapy dose calculation engine.

    Science.gov (United States)

    Chen, Quan; Lu, Weiguo; Chen, Yu; Chen, Mingli; Henderson, Douglas; Sterpin, Edmond

    2012-04-01

    The graphic processing unit (GPU) based TomoTherapy convolution/superposition(C/S) dose engine (GPU dose engine) achieves a dramatic performance improvement over the traditional CPU-cluster based TomoTherapy dose engine (CPU dose engine). Besides the architecture difference between the GPU and CPU, there are several algorithm changes from the CPU dose engine to the GPU dose engine. These changes made the GPU dose slightly different from the CPU-cluster dose. In order for the commercial release of the GPU dose engine, its accuracy has to be validated. Thirty eight TomoTherapy phantom plans and 19 patient plans were calculated with both dose engines to evaluate the equivalency between the two dose engines. Gamma indices (Γ) were used for the equivalency evaluation. The GPU dose was further verified with the absolute point dose measurement with ion chamber and film measurements for phantom plans. Monte Carlo calculation was used as a reference for both dose engines in the accuracy evaluation in heterogeneous phantom and actual patients. The GPU dose engine showed excellent agreement with the current CPU dose engine. The majority of cases had over 99.99% of voxels with Γ(1%, 1 mm) engine also showed similar degree of accuracy in heterogeneous media as the current TomoTherapy dose engine. It is verified and validated that the ultrafast TomoTherapy GPU dose engine can safely replace the existing TomoTherapy cluster based dose engine without degradation in dose accuracy.

  13. Engineering management of large scale systems

    Science.gov (United States)

    Sanders, Serita; Gill, Tepper L.; Paul, Arthur S.

    1989-01-01

    The organization of high technology and engineering problem solving, has given rise to an emerging concept. Reasoning principles for integrating traditional engineering problem solving with system theory, management sciences, behavioral decision theory, and planning and design approaches can be incorporated into a methodological approach to solving problems with a long range perspective. Long range planning has a great potential to improve productivity by using a systematic and organized approach. Thus, efficiency and cost effectiveness are the driving forces in promoting the organization of engineering problems. Aspects of systems engineering that provide an understanding of management of large scale systems are broadly covered here. Due to the focus and application of research, other significant factors (e.g., human behavior, decision making, etc.) are not emphasized but are considered.

  14. NASA software documentation standard software engineering program

    Science.gov (United States)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  15. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  16. SU-E-T-488: An Iso-Dose Curve Based Interactive IMRT Optimization System for Physician-Driven Plan Tuning

    International Nuclear Information System (INIS)

    Shi, F; Tian, Z; Jia, X; Jiang, S; Zarepisheh, M; Cervino, L

    2014-01-01

    Purpose: In treatment plan optimization for Intensity Modulated Radiation Therapy (IMRT), after a plan is initially developed by a dosimetrist, the attending physician evaluates its quality and often would like to improve it. As opposed to having the dosimetrist implement the improvements, it is desirable to have the physician directly and efficiently modify the plan for a more streamlined and effective workflow. In this project, we developed an interactive optimization system for physicians to conveniently and efficiently fine-tune iso-dose curves. Methods: An interactive interface is developed under C++/Qt. The physician first examines iso-dose lines. S/he then picks an iso-dose curve to be improved and drags it to a more desired configuration using a computer mouse or touchpad. Once the mouse is released, a voxel-based optimization engine is launched. The weighting factors corresponding to voxels between the iso-dose lines before and after the dragging are modified. The underlying algorithm then takes these factors as input to re-optimize the plan in near real-time on a GPU platform, yielding a new plan best matching the physician's desire. The re-optimized DVHs and iso-dose curves are then updated for the next iteration of modifications. This process is repeated until a physician satisfactory plan is achieved. Results: We have tested this system for a series of IMRT plans. Results indicate that our system provides the physicians an intuitive and efficient tool to edit the iso-dose curves according to their preference. The input information is used to guide plan re-optimization, which is achieved in near real-time using our GPU-based optimization engine. Typically, a satisfactory plan can be developed by a physician in a few minutes using this tool. Conclusion: With our system, physicians are able to manipulate iso-dose curves according to their preferences. Preliminary results demonstrate the feasibility and effectiveness of this tool

  17. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  18. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1: ASC software quality engineering practices, Version 2.0.

    Energy Technology Data Exchange (ETDEWEB)

    Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Minana, Molly A.; Hackney, Patricia; Forsythe, Christi A.; Schofield, Joseph Richard, Jr. (,; .); Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2006-09-01

    The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR 1.3.2 and 1.3.6 and to a Department of Energy document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines. This document also identifies ASC management and software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.

  19. Application of modern tools and techniques to maximize engineering productivity in the development of orbital operations plans for the space station progrm

    Science.gov (United States)

    Manford, J. S.; Bennett, G. R.

    1985-01-01

    The Space Station Program will incorporate analysis of operations constraints and considerations in the early design phases to avoid the need for later modifications to the Space Station for operations. The application of modern tools and administrative techniques to minimize the cost of performing effective orbital operations planning and design analysis in the preliminary design phase of the Space Station Program is discussed. Tools and techniques discussed include: approach for rigorous analysis of operations functions, use of the resources of a large computer network, and providing for efficient research and access to information.

  20. Preliminary Results on the Influence of Engineered Artificial Mucus Layer on Phonation

    Science.gov (United States)

    Döllinger, Michael; Gröhn, Franziska; Berry, David A.; Eysholdt, Ulrich; Luegmair, Georg

    2014-01-01

    Purpose: Previous studies have confirmed the influence of dehydration and an altered mucus (e.g., due to pathologies) on phonation. However, the underlying reasons for these influences are not fully understood. This study was a preliminary inquiry into the influences of mucus architecture and concentration on vocal fold oscillation. Method: Two…

  1. Environmental Survey preliminary report, Los Alamos National Laboratory, Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Los Alamos National Laboratory (LANL), conducted March 29, 1987 through April 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the LANL, and interviews with site personnel. The Survey team developed Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Idaho National Engineering Laboratory. When completed, the results will be incorporated into the LANL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the LANL. 65 refs., 68 figs., 73 tabs

  2. Environmental Survey preliminary report, Los Alamos National Laboratory, Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Los Alamos National Laboratory (LANL), conducted March 29, 1987 through April 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the LANL, and interviews with site personnel. The Survey team developed Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Idaho National Engineering Laboratory. When completed, the results will be incorporated into the LANL Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the LANL. 65 refs., 68 figs., 73 tabs.

  3. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  4. Lyondell plans to hike heavy crude runs at Houston

    International Nuclear Information System (INIS)

    Land, R.

    1992-01-01

    Lyondell Petrochemical Co. has outlined a venture that would allow increased runs of heavy crude oil at its 265,000 b/cd Houston refiner. Preliminary plans call for Lyondell, Houston, to ally with subsidiaries of Venezuela's Petroleos de Venezuela SA to upgrade heavy crude processing capabilities of the refiner and obtain supplies of heavy crude feedstock. Lyondell proposes to form a jointly owned company with Pdvsa's Citgo Petroleum Corp. subsidiary to take over ownership of the Houston plant. This paper reports that upgrades would not significantly change the plant's crude capacity but would allow the refiner to process as much as 200,000 b/d of heavy crude feedstock, up from 120,000 b/d at present. Following completion of the upgrade, Citgo could increase its interest to 50% with Lyondell retaining remaining venture interest. Upgrade design and engineering are to begin immediately, with regulatory permitting and construction expected to be complete in 3-4 years

  5. Preliminary design package for solar hot water system

    Energy Technology Data Exchange (ETDEWEB)

    Fogle, Val; Aspinwall, David B.

    1977-12-01

    The information necessary to evaluate the preliminary design of the Solar Engineering and Manufacturing Company's (SEMCO) solar hot water system is presented. This package includes technical information, schematics, drawings and brochures. This system, being developed by SEMCO, consists of the following subsystems: collector, storage, transport, control, auxiliary energy, and Government-furnished site data acquisition. The two units being manufactured will be installed at Loxahatchee, Florida, and Macon, Georgia.

  6. Preliminary study of optimum ductburning turbofan engine cycle design parameters for supersonic cruising

    Science.gov (United States)

    Fishbach, L. H.

    1978-01-01

    The effect of turbofan engine overall pressure ratio, fan pressure ratio, and ductburner temperature rise on the engine weight and cruise fuel consumption for a mach 2.4 supersonic transport was investigated. Design point engines, optimized purely for the supersonic cruising portion of the flight where the bulk of the fuel is consumed, are considered. Based on constant thrust requirements at cruise, fuel consumption considerations would favor medium by pass ratio engines (1.5 to 1.8) of overall pressure ratio of about 16. Engine weight considerations favor low bypass ratio (0.6 or less) and low wverall pressure ratio (8). Combination of both effects results in bypass ratios of 0.6 to 0.8 and overall pressure ratio of 12 being the overall optimum.

  7. Planning, implementation and analysis of an assessment method of an industrial engineering course grounded on problem based learning

    Directory of Open Access Journals (Sweden)

    Camila Pereira Pinto

    2015-06-01

    Full Text Available In a highly competitive market, companies need increasingly skilled human resources, especially when it comes to engineering. Universities, therefore, play an important role in this scenario, while training future professionals of the country. However, in this task, the institutions are faced with the challenge of attracting and working with young people of Generation Y, which have characteristics and needs that are not met by traditional teaching methods. Problem-Based Learning (PBL is an approach evolved in order to study and develop educational alternatives that meet the needs of businesses as well as the new student profile. In addition, actively teaching is not a simple task and becomes more complex when it refers to assess the knowledge gained through this method. Thus, this paper presents the planning, implementation and the assessment method adopted in a course of Industrial Engineering at the Federal University of Itajubá based on PBL. For this study it was adopted the action research method, in which the authors actively participated in all stages of the course, acting as facilitators in the course planning, implementation and monitoring. As a result, it is highlighted in this article, the benefits achieved by all involved through active learning, as well as the strengths and weaknesses of the method. Moreover, improvements are proposed for future courses.

  8. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    Energy Technology Data Exchange (ETDEWEB)

    Chandler, K.; Eudy, L.

    2008-10-01

    This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

  9. Concepts for Distributed Engine Control

    Science.gov (United States)

    Culley, Dennis E.; Thomas, Randy; Saus, Joseph

    2007-01-01

    Gas turbine engines for aero-propulsion systems are found to be highly optimized machines after over 70 years of development. Still, additional performance improvements are sought while reduction in the overall cost is increasingly a driving factor. Control systems play a vitally important part in these metrics but are severely constrained by the operating environment and the consequences of system failure. The considerable challenges facing future engine control system design have been investigated. A preliminary analysis has been conducted of the potential benefits of distributed control architecture when applied to aero-engines. In particular, reductions in size, weight, and cost of the control system are possible. NASA is conducting research to further explore these benefits, with emphasis on the particular benefits enabled by high temperature electronics and an open-systems approach to standardized communications interfaces.

  10. Chinese engineers and scientists urge leadership to change Three Gorges Dam operating plan

    International Nuclear Information System (INIS)

    2000-01-01

    An appeal to the Chinese Leadership by a group of senior engineers, water management experts and academics about the dire consequences of filling the Three Gorges reservoir on the Yangtze River to 175 metres, is reported. Originally, the plan was to keep water levels behind the Three Gorges Dam at 156 metres for the first ten years of operation, in order to allow for resettlement of people displaced by building the dam, and to evaluate the impact of silt deposits on navigation and ports at the upper end of the reservoir. Plans have changed in 1997; the water level is now scheduled to rise to 175 metres in the sixth year of the dam's operation in order to maximize the dam's power output. The appeal by 53 experts warned the Chinese Government that the filling of the reservoir to 175 metres would displace 1.13 million people and raise the water level in the Yangtze River more than 10 metres at Chongqing City, submerging drainage outlets and backing up the city's sewage, as well as increase silt deposits, blocking shipping traffic along the Yangtze River. A parallel is drawn with the Sanmenxia Dam on the Yellow River. It was completed in 1960; it has proven to be useless for controlling floods while producing only one-third of its expected output due to massive silt build-up in the reservoir

  11. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  12. Engineers' Responsibilities for Global Electronic Waste: Exploring Engineering Student Writing Through a Care Ethics Lens.

    Science.gov (United States)

    Campbell, Ryan C; Wilson, Denise

    2017-04-01

    This paper provides an empirically informed perspective on the notion of responsibility using an ethical framework that has received little attention in the engineering-related literature to date: ethics of care. In this work, we ground conceptual explorations of engineering responsibility in empirical findings from engineering student's writing on the human health and environmental impacts of "backyard" electronic waste recycling/disposal. Our findings, from a purposefully diverse sample of engineering students in an introductory electrical engineering course, indicate that most of these engineers of tomorrow associated engineers with responsibility for the electronic waste (e-waste) problem in some way. However, a number of responses suggested attempts to deflect responsibility away from engineers towards, for example, the government or the companies for whom engineers work. Still other students associated both engineers and non-engineers with responsibility, demonstrating the distributed/collective nature of responsibility that will be required to achieve a solution to the global problem of excessive e-waste. Building upon one element of a framework for care ethics adopted from the wider literature, these empirical findings are used to facilitate a preliminary, conceptual exploration of care-ethical responsibility within the context of engineering and e-waste recycling/disposal. The objective of this exploration is to provide a first step toward understanding how care-ethical responsibility applies to engineering. We also hope to seed dialogue within the engineering community about its ethical responsibilities on the issue. We conclude the paper with a discussion of its implications for engineering education and engineering ethics that suggests changes for educational policy and the practice of engineering.

  13. Development plan of basic technology for a high intensity proton linear accelerator

    International Nuclear Information System (INIS)

    Mizumoto, M.

    1990-01-01

    The national program called OMEGA (Option Making Extra Gains from Actinide and Fission Products) has started with the aim of promoting the research and development of the new technologies for nuclear waste partitioning and transmutation. As a part of this program, Japan Atomic Energy Research Institute, JAERI, has laid out several R and D plans for accelerator based actinide transmutation. The present article first outlines the status of the high intensity proton linear accelerator. Then it describes the time schedule for the development of a high intensity proton linac, focusing on the first step development (basic technology accelerator), second step development (engineering test accelerator, and third step development (commercial plant). It also outlines the conceptual design study and preliminary design calculations for basic technology accelerator, focusing on general consideration, ion source, radio frequency quadrupole, drift tube linac, and high beta linac. (N.K.)

  14. Planejamento participativo no subprograma QEQ do PADCT Joint strategic planning in the chemistry and chemical engineering subprogram of PADCT

    Directory of Open Access Journals (Sweden)

    Eucler B. Paniago

    2007-12-01

    Full Text Available The development of the Brazilian chemistry sector, during the last 30 years, is nowadays being attributed to PADCT (Science and Technology Development Program. Since the seventies, the Government took notice of the importance of research in chemistry for the Brazilian economy, therefore creating PADCT to support chemistry and chemical engineering among other areas of science and technology. Planning and implementation of the second phase of this program represented a real joint strategic planning. Since then, academic research and human resources education have experienced significant improvements. However, in the chemical trade, the deficit continues to grow, in spite of an almost constant ratio between importation costs and export revenues. Continued investments for research in the area remain necessary.

  15. Draft audit report, human factors engineering control room design review: Saint Lucie Nuclear Power Plant, Unit No. 2

    International Nuclear Information System (INIS)

    Peterson, L.R.; Lappa, D.A.; Moore, J.W.

    1981-01-01

    A human factors engineering preliminary design review of the Saint Lucie Unit 2 control room was performed at the site on August 3 through August 7, 1981. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. This report was prepared on the basis of the HFEB's review of the applicant's Preliminary Design Assessment and the human factors engineering design review/audit performed at the site. The review team included human factors consultants from BioTechnology, Inc., Falls Church, Virginia, and from Lawrence Livermore National Laboratory (University of California), Livermore, California

  16. Preliminary evaluation of crisis-relocation fallout-shelter options. Volume 2. Detailed analysis

    Energy Technology Data Exchange (ETDEWEB)

    Santini, D.J.; Clinch, J.M.; Davis, F.H.; Hill, L.G.; Lynch, E.P.; Tanzman, E.A.; Wernette, D.R.

    1982-12-01

    This report presents a preliminary, detailed evaluation of various shelter options for use if the President orders crisis relocation of the US urban population because of strong expectation of a nuclear war. The availability of livable shelter space at 40 ft/sup 2/ per person (congregate-care space) by state is evaluated. Options are evaluated for construction of fallout shelters allowing 10 ft/sup 2/ per person - such shelters are designed to provide 100% survival at projected levels of radioactive fallout. The FEMA concept of upgrading existing buildings to act as fallout shelters can, in principle, provide adequate shelter throughout most of the US. Exceptions are noted and remedies proposed. In terms of upgrading existing buildings to fallout shelter status, great benefits are possible by turning away from a standard national approach and adopting a more site-specific approach. Existing FEMA research provides a solid foundation for successful crisis relocation planning, but the program can be refined by making suitable modifications in its locational, engineering, and institutionally specific elements.

  17. Hanford Waste Vitrification Plant: Preliminary description of waste form and canister

    International Nuclear Information System (INIS)

    Mitchell, D.E.

    1986-01-01

    In July 1985, the US Department of Energy's Office of Civilian Radioactive Waste Management established the Waste Acceptance Process as the means by which defense high-level waste producers, such as the Hanford Waste Vitrification Plant, will develop waste acceptance requirements with the candidate geologic repositories. A complete description of the Waste Acceptance Process is contained in the Preliminary Hanford Waste Vitrification Plant Waste Form Qualification Plan. The Waste Acceptance Process defines three documents that high-level waste producers must prepare as a part of the process of assuming that a high-level waste product will be acceptable for disposal in a geologic repository. These documents are the Description of Waste Form and Canister, Waste Compliance Plan, and Waste Qualification Report. This document is the Hanford Waste Vitrification Plant Preliminary Description of Waste Form and Canister for disposal of Neutralized Current Acid Waste. The Waste Acceptance Specifications for the Hanford Waste Vitrification Plant have not yet been developed, therefore, this document has been structured to corresponds to the Waste Acceptance Preliminary Specifications for the Defense Waste Processing Facility High-Level Waste Form. Not all of the information required by these specifications is appropriate for inclusion in this Preliminary Description of Waste Form and Canister. Rather, this description is limited to information that describes the physical and chemical characteristics of the expected high-level waste form. The content of the document covers three major areas: waste form characteristics, canister characteristics, and canistered waste form characteristics. This information will be used by the candidate geologic repository projects as the basis for preliminary repository design activities and waste form testing. Periodic revisions are expected as the Waste Acceptance Process progresses

  18. Coal-fueled high-speed diesel engine development: Task 2, Market assessment and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kakwani, R. M.; Wilson, Jr., R. P.; Winsor, R. E.

    1991-12-01

    Based on the preliminary coal engine design developed, this task was conducted to identify the best opportunity(s) to enter the market with the future coal-fueled, high-speed diesel engine. The results of this market and economic feasibility assessment will be used to determine what specific heavy duty engine application(s) are most attractive for coal fuel, and also define basic economic targets for the engine to be competitive.

  19. Transmission investment and expansion planning in a restructured electricity market

    International Nuclear Information System (INIS)

    Wu, F.F; Wen, F.S.; Zheng, F.L.

    2006-01-01

    Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thus, the paper makes economic literature more accessible to the engineering community and engineering literature more accessible to the economic community interested in the subject. (author)

  20. Preliminary Axial Flow Turbine Design and Off-Design Performance Analysis Methods for Rotary Wing Aircraft Engines. Part 2; Applications

    Science.gov (United States)

    Chen, Shu-cheng, S.

    2009-01-01

    In this paper, preliminary studies on two turbine engine applications relevant to the tilt-rotor rotary wing aircraft are performed. The first case-study is the application of variable pitch turbine for the turbine performance improvement when operating at a substantially lower shaft speed. The calculations are made on the 75 percent speed and the 50 percent speed of operations. Our results indicate that with the use of the variable pitch turbines, a nominal (3 percent (probable) to 5 percent (hypothetical)) efficiency improvement at the 75 percent speed, and a notable (6 percent (probable) to 12 percent (hypothetical)) efficiency improvement at the 50 percent speed, without sacrificing the turbine power productions, are achievable if the technical difficulty of turning the turbine vanes and blades can be circumvented. The second casestudy is the contingency turbine power generation for the tilt-rotor aircraft in the One Engine Inoperative (OEI) scenario. For this study, calculations are performed on two promising methods: throttle push and steam injection. By isolating the power turbine and limiting its air mass flow rate to be no more than the air flow intake of the take-off operation, while increasing the turbine inlet total temperature (simulating the throttle push) or increasing the air-steam mixture flow rate (simulating the steam injection condition), our results show that an amount of 30 to 45 percent extra power, to the nominal take-off power, can be generated by either of the two methods. The methods of approach, the results, and discussions of these studies are presented in this paper.

  1. Preliminary Results from Simulations of Temperature Fluctuations in Stirling Engine Regenerator Matrices

    DEFF Research Database (Denmark)

    Andersen, Stig Kildegård; Carlsen, Henrik; Thomsen, Per Grove

    2003-01-01

    The objective of this study has been to create a model for studying effects of temperature fluctuations in regenerator matrices on Stirling engine performance. A one-dimensional model with axial discretisation of engine components has been formulated using a fixed Eulerian grid. The model contains...... that adjusts solutions so that they satisfy the necessary cyclic boundary conditions as well as integral conditions for cyclic heat transfer for walls in the engine and for the mean cycle pressure. It has been found that it is possible to accurately solve the stiff ODE system that describes the coupled...

  2. Affordable Development and Demonstration of a Small NTR Engine and Stage: How Small is Big Enough?

    Science.gov (United States)

    Borowski, Stanley K.; Sefcik, Robert J.; Fittje, James E.; McCurdy, David R.; Qualls, Arthur L.; Schnitzler, Bruce G.; Werner, James E.; Weitzberg (Abraham); Joyner, Claude R.

    2015-01-01

    The Nuclear Thermal Rocket (NTR) derives its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core. It generates high thrust and has a specific impulse potential of approximately 900 seconds - a 100% increase over today's best chemical rockets. The Nuclear Thermal Propulsion (NTP) project, funded by NASA's AES program, includes five key task activities: (1) Recapture, demonstration, and validation of heritage graphite composite (GC) fuel (selected as the "Lead Fuel" option); (2) Engine Conceptual Design; (3) Operating Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable Development Strategy. During FY'14, a preliminary DDT&E plan and schedule for NTP development was outlined by GRC, DOE and industry that involved significant system-level demonstration projects that included GTD tests at the NNSS, followed by a FTD mission. To reduce cost for the GTD tests and FTD mission, small NTR engines, in either the 7.5 or 16.5 klbf thrust class, were considered. Both engine options used GC fuel and a "common" fuel element (FE) design. The small approximately 7.5 klbf "criticality-limited" engine produces approximately 157 megawatts of thermal power (MWt) and its core is configured with parallel rows of hexagonal-shaped FEs and tie tubes (TTs) with a FE to TT ratio of approximately 1:1. The larger approximately 16.5 klbf Small Nuclear Rocket Engine (SNRE), developed by LANL at the end of the Rover program, produces approximately 367 MWt and has a FE to TT ratio of approximately 2:1. Although both engines use a common 35 inch (approximately 89 cm) long FE, the SNRE's larger diameter core contains approximately 300 more FEs needed to produce an additional 210 MWt of power. To reduce the cost of the FTD mission, a simple "1-burn" lunar flyby mission was considered to reduce the LH2 propellant loading, the stage size and complexity. Use of existing and

  3. Site study plan for cultural resources, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Cultural Resources Site Study Plan describes a field program to identify and evaluate the archaeological, historical, and Native American Indian resources of the site on local and regional perspectives; monitor and manage discovered cultural resources; and establish a worker education program. The archaeological field program consists of three pedestrian surveys: Survey 1 includes two EDBH seismic survey lines and the area within the exploratory shaft facility (ESF); Survey 2 includes the remainder of the site plus a 1/4 to 3/4-mi border area; and Survey 3 includes an assortment of offsite areas. The historical studies will identify and evaluate known and discovered historical sites and structures and the Native American Indian will identify and evaluate cultural and religious concerns expressed by Indian tribal groups. Prehistoric and historic sites will be evaluated to determine if they meet eligibility criteria for listing on the National Register of Historic Places. This site study plan describes the need for each study; its design and design rationale; analysis, management, and use of data; schedule of field activities; organization of field personnel and sample management; and quality assurance requirements. The cultural resource studies will provide data for satisfying the Programmatic Agreement, engineering design needs, and SRP requirements for permits and approvals, and for minimizing effects to any cultural properties discovered during site characterization. 75 refs., 10 figs., 2 tabs

  4. Fast Whole-Engine Stirling Analysis

    Science.gov (United States)

    Dyson, Rodger W.; Wilson, Scott D.; Tew, Roy C.; Demko, Rikako

    2007-01-01

    An experimentally validated approach is described for fast axisymmetric Stirling engine simulations. These simulations include the entire displacer interior and demonstrate it is possible to model a complete engine cycle in less than an hour. The focus of this effort was to demonstrate it is possible to produce useful Stirling engine performance results in a time-frame short enough to impact design decisions. The combination of utilizing the latest 64-bit Opteron computer processors, fiber-optical Myrinet communications, dynamic meshing, and across zone partitioning has enabled solution times at least 240 times faster than previous attempts at simulating the axisymmetric Stirling engine. A comparison of the multidimensional results, calibrated one-dimensional results, and known experimental results is shown. This preliminary comparison demonstrates that axisymmetric simulations can be very accurate, but more work remains to improve the simulations through such means as modifying the thermal equilibrium regenerator models, adding fluid-structure interactions, including radiation effects, and incorporating mechanodynamics.

  5. Engineered barrier system and waste package design concepts for a potential geologic repository at Yucca Mountain

    International Nuclear Information System (INIS)

    Short, D.W.; Ruffner, D.J.; Jardine, L.J.

    1991-10-01

    We are using an iterative process to develop preliminary concept descriptions for the Engineered Barrier System and waste-package components for the potential geologic repository at Yucca Mountain. The process allows multiple design concepts to be developed subject to major constraints, requirements, and assumptions. Involved in the highly interactive and interdependent steps of the process are technical specialists in engineering, metallic and nonmetallic materials, chemistry, geomechanics, hydrology, and geochemistry. We have developed preliminary design concepts that satisfy both technical and nontechnical (e.g., programmatic or policy) requirements

  6. Alternative Pathways to Engineering Success--Using Academic and Social Integration to Understand Two-Year Engineering Student Success

    Science.gov (United States)

    Marra, Rose M.; Tsai, Chia-Lin; Bogue, Barbara; Pytel, Jean Landa

    2015-01-01

    The need for educating engineers in the United States continues as the projected demand is rising the number of high school seniors planning to enter engineering careers has remained relatively stable (Sargent, 2014). Additionally, figures show that attrition rates in undergraduate engineering continue to be an area of concern, (Sargent, 2014;…

  7. Area-based initiatives - Engines of planning and policy innovation?

    DEFF Research Database (Denmark)

    Agger, Annika; Norvig Larsen, Jacob

    studies of local planning culture change are discussed. Main findings are that during the past two decades a general change in planning culture has developed gradually, triggered by urban regeneration full scale experimentation with place-based approaches. Second, planners as well as public administrators...... and development in planning culture turns out to be a more substantial result than the reduction of social exclusion and economic deprivation. The paper analyses all available official evaluation studies of Danish place-based urban policy initiatives from mid-1990s through 2010. In addition to this, recent...... attitude towards the involvement of local citizens and stakeholders is significantly transformed. While earlier, public participation in planning was mostly restricted to what was lawfully mandatory, the new turn in planning culture demonstrates a practice that goes much further in involving citizens...

  8. Preliminary project concerning the straw-fueled combined power-heat plant to be constructed at Glamsbjerg

    International Nuclear Information System (INIS)

    Gabriel, S.; Koch, T.

    1994-06-01

    Power and heat generation based on biomass gasification is of great importance due to its beneficial environmental effects and good economy. This report concerns a preliminary project on feasibility and problems of implementing a dual-purpose power plant, supplying both power and district heating to several schools, swimming pools and other public facilities at Glamsbjerg (Funen). The plant is to be based on thermal gasification (pyrolysis) of straw and use of the gas in a diesel engine. The diesels operate the power generator, and their waste heat should be utilized in the local district heating network. In order to establish a stable and flexible straw supply to the plant an evaluation of resources in the area has been carried out. Apart from straw-derived fuel the plant is planned to use natural gas for start and maintenance of the process. The prices of the combined plant and of the fuel processing are estimated in the report. (EG)

  9. Bitumen/Water Emulsions as Fuels for High-Speed Ci Engines Preliminary Investigations

    DEFF Research Database (Denmark)

    Schramm, Jesper; Sigvardsen, R.; Forman, M.

    2003-01-01

    Mixtures of bitumen and water, are cheap fuel alternatives for combustion engines. There are, however, several problems that have to be solved before these fuels can be applied in high-speed diesel engines. These are: - emulsion break up due to high temperature or high shear stress in the injection...

  10. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  11. Miniaturization limitations of rotary internal combustion engines

    International Nuclear Information System (INIS)

    Wang, Wei; Zuo, Zhengxing; Liu, Jinxiang

    2016-01-01

    Highlights: • Developed a phenomenological model for rotary internal combustion engines. • Presented scaling laws for the performance of micro rotary engines. • Adiabatic walls can improve the cycle efficiency but result in higher charge leakage. • A lower compression ratio can increase the efficiency due to lower mass losses. • Presented possible minimum engine size of rotary internal combustion engines. - Abstract: With the rapid development of micro electro-mechanical devices, the demands for micro power generation systems have significantly increased in recent years. Traditional chemical batteries have energy densities much lower than hydrocarbon fuels, which makes internal-combustion-engine an attractive technological alternative to batteries. Micro rotary internal combustion engine has drawn great attractions due to its planar design, which is well-suited for fabrication in MEMS. In this paper, a phenomenological model considering heat transfer and mass leakage has been developed to investigate effects of engine speed, compression ratio, blow-by and heat transfer on the performance of micro rotary engine, which provide the guidelines for preliminary design of rotary engine. The lower possible miniaturization limits of rotary combustion engines are proposed.

  12. Preliminary market assessment of fluidized-bed waste-heat recovery technology

    Energy Technology Data Exchange (ETDEWEB)

    Campos, F.T.; Fey, C.L.; Grogan, P.J.; Klein, N.P.

    1980-06-01

    A preliminary assessment of fluidized-bed waste-heat recovery (FBWHR) system market potential is presented with emphasis on the factors influencing industrial acceptability. Preliminary market potential areas are identified based on the availability of waste heat. Trends in energy use are examined to see the effect they might have on these market potential areas in the future. Focus groups interviews are used to explore important factors in the industrial decision-making process. These important factors are explored quantitatively in a survey of industrial plant engineers. The survey deals with the waste-heat boiler configuration of the FBWHR system. Results indicate market acceptance of the fluidized-bed waste-heat boiler could be quite low.

  13. Preliminary consideration for research on geological disposal of high-level radioactive waste in China in the period of 2000-2040

    International Nuclear Information System (INIS)

    Xu Guoqing

    2004-01-01

    Based on the overseas practical experiences with combination of domestic realistic conditions a preliminary consideration of a long-range plan is proposed for research on geological disposal of high-level radioactive waste in China in the period of 2000-2040. An overview of research on geological disposal of high-level radioactive waste in the overseas and mainland is presented shortly first in this paper. Then the discussion is centered on the preliminary consideration of a long-range plan for research on geological disposal of high-level radioactive waste in China. The partition of stages of research on geological disposal of high-level radioactive waste, the goal, task, research contents and time table for each research stage is stated in this preliminary consideration. The data mentioned above will probably be useful for making plan for geological disposal of high-level radioactive waste in the future in China. (author)

  14. Tool for Turbine Engine Closed-Loop Transient Analysis (TTECTrA) Users' Guide

    Science.gov (United States)

    Csank, Jeffrey T.; Zinnecker, Alicia M.

    2014-01-01

    The tool for turbine engine closed-loop transient analysis (TTECTrA) is a semi-automated control design tool for subsonic aircraft engine simulations. At a specific flight condition, TTECTrA produces a basic controller designed to meet user-defined goals and containing only the fundamental limiters that affect the transient performance of the engine. The purpose of this tool is to provide the user a preliminary estimate of the transient performance of an engine model without the need to design a full nonlinear controller.

  15. SERC corporate plan 1993

    International Nuclear Information System (INIS)

    1993-03-01

    In its last Corporate Plan, the Science and Engineering Research Council (SERC) planned wide-ranging policy and programme reviews. These have been carried out and the results set the context for this plan. In addition, the SERC is responding to major changes in the higher education sector and a difficult financial climate. The Plan has been prepared before the Government's proposed White Paper on science and technology is available but is consistent with the SERC's advice on the White Paper. The SERC's ''mission statement'' recognises its dual role of strengthening the United Kingdom's capabilities in fundamental research and of developing capabilities in strategic research related to industrial and social need. Six strategic aims are identified: the funding of a portfolio of excellent research which contributes both to advancement of knowledge, and economic and social advance, the support of the training of scientists and engineers, the improvement of knowledge transfer within the ''science and engineering base'' and between this base and industry, the promotion of effective international collaboration, increasing the public awareness of research in science and engineering and improving the economy, efficiency and effectiveness of all of the SERC's operations. Within its programme expenditure, the SERC will examine whether funding should be extended to a wider range of bodies; develop new, more efficient, ways of funding higher education institutes (HEI) research; increase emphasis on output measures of research; specify service standards; and market-test scientific support activities. The SERC will make gains of at least 1.5% a year in efficiency of administration, through measures including market testing, and will extend management accounting systems. (Author)

  16. Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5

    Energy Technology Data Exchange (ETDEWEB)

    DiVincenzo, E.P.

    1994-09-27

    The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

  17. Engineering Faculty Motivation for and Engagement in Formative Assessment

    OpenAIRE

    Stanton, Kenneth C.

    2011-01-01

    The purposes of this study were to conduct an exploratory study of the status quo of engineering faculty motivation for and engagement in formative assessment, and to conduct a preliminary validation of a motivational model, based in self-determination theory, that explains relationships between these variables. To do so, a survey instrument was first developed and validated, in accordance with a process prescribed in the literature, that measured individual engineering faculty membersâ mo...

  18. Preliminary analysis of patent trends for magnetic fusion technology

    International Nuclear Information System (INIS)

    Levine, L.O.; Ashton, W.B.; Campbell, R.S.

    1984-02-01

    This study presents a preliminary analysis of development trends in magnetic fusion technology based on data from US patents. The research is limited to identification and description of general patent activity and ownership characteristics for 373 patents. The results suggest that more detailed studies of fusion patents could provide useful R and D planning information

  19. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter

  20. Integrated water resources management using engineering measures

    Science.gov (United States)

    Huang, Y.

    2015-04-01

    The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  1. Integrated water resources management using engineering measures

    Directory of Open Access Journals (Sweden)

    Y. Huang

    2015-04-01

    Full Text Available The management process of Integrated Water Resources Management (IWRM consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation, are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.

  2. Coupling Adaptation Tipping Points and Engineering Options: New Insights for Resilient Water Infrastructure Replacement Planning

    Science.gov (United States)

    Smet, K.; de Neufville, R.; van der Vlist, M.

    2017-12-01

    This work presents an innovative approach for replacement planning for aging water infrastructure given uncertain future conditions. We draw upon two existing methodologies to develop an integrated long-term replacement planning framework. We first expand the concept of Adaptation Tipping Points to generate long-term planning timelines that incorporate drivers of investment related to both internal structural processes as well as changes in external operating conditions. Then, we use Engineering Options to explore different actions taken at key moments in this timeline. Contrasting to the traditionally more static approach to infrastructure design, designing the next generation of infrastructure so it can be changed incrementally is a promising method to safeguard current investments given future uncertainty. This up-front inclusion of structural options in the system actively facilitates future adaptation, transforming uncertainty management in infrastructure planning from reactive to more proactive. A two-part model underpins this approach. A simulation model generates diverse future conditions, allowing development of timelines of intervention moments in the structure's life. This feeds into an economic model, evaluating the lifetime performance of different replacement strategies, making explicit the value of different designs and their flexibility. A proof of concept study demonstrates this approach for a pumping station. The strategic planning timelines for this structure demonstrate that moments when capital interventions become necessary due to reduced functionality from structural degradation or changed operating conditions are widely spread over the structure's life. The disparate timing of these necessary interventions supports an incremental, adaptive mindset when considering end-of-life and replacement decisions. The analysis then explores different replacement decisions, varying the size and specific options included in the proposed new structure

  3. Education of indoor enviromental engineering technology

    Czech Academy of Sciences Publication Activity Database

    Kic, P.; Zajíček, Milan

    2011-01-01

    Roč. 9, Spec. 1 (2011), s. 83-90 ISSN 1406-894X. [Biosystems Engineering 2011. Tartu, 12.05.2011-13.05.2011] Institutional research plan: CEZ:AV0Z10750506 Keywords : Biosystems engineering * indoor environment * study * programs Subject RIV: AM - Education http://library.utia.cas.cz/separaty/2011/VS/zajicek-education of indoor enviromental engineering technology.pdf

  4. Non-Toxic Orbital Maneuvering System Engine Development

    Science.gov (United States)

    Green, Christopher; Claflin, Scott; Maeding, Chris; Butas, John

    1999-01-01

    Recent results using the Aestus engine operated with LOx/ethanol propellant are presented. An experimental program at Rocketdyne Propulsion and Power is underway to adapt this engine for the Boeing Reusable Space Systems Division non-toxic Orbital Maneuvering System/Reaction control System (OMS/RCS) system. Daimler-Chrysler Aerospace designed the Aestus as an nitrogen tetroxide/monomethyl hydrazine (NTO/MMH) upper-stage engine for the Ariane 5. The non-toxic OMS/RCS system's preliminary design requires a LOx/ethanol (O2/C2H5OH) engine that operates with a mixture ratio of 1.8, a specific impulse of 323 seconds, and fits within the original OMS design envelope. This paper describes current efforts to meet these requirements including, investigating engine performance using LOx/ethanol, developing the en-ine system sizing package, and meeting the vehicle operation parameters. Data from hot-fire testing are also presented and discussed.

  5. Roadmapping - A Tool for Strategic Planning and Leveraging R and D completed by other Agencies

    International Nuclear Information System (INIS)

    Collins, J. W.

    2002-01-01

    The Department of Energy (DOE) is responsible for management of the environmental legacy of the nation's nuclear weapons and research program. This is the largest, most complex environmental cleanup program in the world. The issues and problems encountered in this program create the need to develop many scientific and technological solutions. To be effective, the process used to create these solutions must be well coordinated through DOE's Environmental Management program, the rest of DOE, and other Federal agencies. Roadmapping is one strategic planning tool to provide the needed coordination. Past roadmapping accomplishments include: (1) Issuance of the Draft EM Roadmapping Guidance; (2) Issuance of the EM R and D Program Plan and Strategic Plan which established the direction for Roadmapping; (3) Issuance of the OST Management Plan which calls out Roadmapping as a key tool in EM Research and Development (R and D) Strategic Planning; (4) Completion of or progress on key EM Roadmaps, i.e., Savannah River High Level Waste (HLW) Salt Dispositioning Roadmaps, Hanford Groundwater/Vadose Zone Roadmap, Robotics and Intelligent Machines Critical Technology Roadmap, Complex-Wide Vadose Zone Roadmap, Long-Term Stewardship Preliminary Roadmap, Hydrogen Gas Generation R and D Plan (Roadmap), Idaho National Engineering and Environmental Laboratory (INEEL) Sodium Bearing Waste Dispositioning Roadmap, INEEL Voluntary Consent Order Tanks Characterization Roadmap, INEEL Vadose Zone/Groundwater Roadmap, Calcine Treatment Alternatives Roadmap. These efforts represent a great start; however, there is more to be accomplished in using Roadmapping as a tool for planning strategic initiatives and in coordinating the R and D performed by multiple federal agencies

  6. Columbia River impact evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    As a result of past practices, four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. To accomplish the timely cleanup of the past-practice units, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), was signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE). To support the Tri-Party Agreement, milestones were adopted. These milestones represent the actions needed to ensure acceptable progress toward Hanford Site compliance with CERCLA, RCRA, and the Washington State Hazardous Waste Management Act of 1976. This report was prepared to fulfill the requirement of Tri-Party Agreement Milestone M-30-02, which requires a plan to determine cumulative health and environmental impacts to the Columbia River. This plan supplements the CERCLA remedial investigations/feasibility studies (RI/FS) and RCRA facility investigations/corrective measures studies (RFI/CMSs) that will be undertaken in the 100 Area. To support the plan development process, existing information was reviewed and a preliminary impact evaluation based on this information was performed. The purpose of the preliminary impact evaluation was to assess the adequacy of existing data and proposed data collection activities. Based on the results of the evaluation, a plan is proposed to collect additional data or make changes to existing or proposed data collection activities.

  7. A preliminary study on cone beam CT image based treatment planning

    International Nuclear Information System (INIS)

    Padmanaban, Sriram; Jeevanandham, Prakash; Boopathy, Raghavendiran; Sukumar, Prabakar; Syam Kumar, S.A.; Kunjithapatham, Bhuvana; Nagarajan, Vivekanandan

    2008-01-01

    Kilovolt Cone beam computed tomography (CBCT) based on flat panel technology is primarily used for positioning verification. However it is required to evaluate the accuracy of dose calculation based on CBCT images for the purpose of re-planning in adaptive radiation therapy (ART). In this study, 3DCRT and IMRT plans were done using both the planning CT and CBCT images and the corresponding variations in dose and MUs were analyzed, hence evaluating the feasibility of using kilovolt CBCT for dose calculation and patient dose verification. (author)

  8. System engineering approach to planning anticancer therapies

    CERN Document Server

    Świerniak, Andrzej; Smieja, Jaroslaw; Puszynski, Krzysztof; Psiuk-Maksymowicz, Krzysztof

    2016-01-01

    This book focuses on the analysis of cancer dynamics and the mathematically based synthesis of anticancer therapy. It summarizes the current state-of-the-art in this field and clarifies common misconceptions about mathematical modeling in cancer. Additionally, it encourages closer cooperation between engineers, physicians and mathematicians by showing the clear benefits of this without stating unrealistic goals. Development of therapy protocols is realized from an engineering point of view, such as the search for a solution to a specific control-optimization problem. Since in the case of cancer patients, consecutive measurements providing information about the current state of the disease are not available, the control laws are derived for an open loop structure. Different forms of therapy are incorporated into the models, from chemotherapy and antiangiogenic therapy to immunotherapy and gene therapy, but the class of models introduced is broad enough to incorporate other forms of therapy as well. The book be...

  9. Journal of transportation engineering

    National Research Council Canada - National Science Library

    1983-01-01

    The Journal of Transportation Engineering contains technical and professional articles on the planning, design, construction, maintenance, and operation of air, highway, rail, and urban transportation...

  10. Options for Parallelizing a Planning and Scheduling Algorithm

    Science.gov (United States)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  11. Enterprise resource planning (ERP) implementation using the value engineering methodology and Six Sigma tools

    Science.gov (United States)

    Leu, Jun-Der; Lee, Larry Jung-Hsing

    2017-09-01

    Enterprise resource planning (ERP) is a software solution that integrates the operational processes of the business functions of an enterprise. However, implementing ERP systems is a complex process. In addition to the technical issues, companies must address problems associated with business process re-engineering, time and budget control, and organisational change. Numerous industrial studies have shown that the failure rate of ERP implementation is high, even for well-designed systems. Thus, ERP projects typically require a clear methodology to support the project execution and effectiveness. In this study, we propose a theoretical model for ERP implementation. The value engineering (VE) method forms the basis of the proposed framework, which integrates Six Sigma tools. The proposed framework encompasses five phases: knowledge generation, analysis, creation, development and execution. In the VE method, potential ERP problems related to software, hardware, consultation and organisation are analysed in a group-decision manner and in relation to value, and Six Sigma tools are applied to avoid any project defects. We validate the feasibility of the proposed model by applying it to an international manufacturing enterprise in Taiwan. The results show improvements in customer response time and operational efficiency in terms of work-in-process and turnover of materials. Based on the evidence from the case study, the theoretical framework is discussed together with the study's limitations and suggestions for future research.

  12. Preliminary study on the corrosion behavior of carbon steel in Horonobe groundwater environment

    International Nuclear Information System (INIS)

    Taniguchi, Naoki; Kogawa, Noritaka; Maeda, Kazuto

    2006-08-01

    It is necessary to understand the corrosion behavior of candidate overpack materials to plan the in-situ engineered barrier test at underground laboratory constructing at Horonobe and to design the overpacks suitable to Horonobe environment. The preliminary corrosion tests of carbon steel which is a candidate material for overpacks were carried out using artificial groundwater and actual groundwater sampled at Horonobe. As the results of anodic polarization experiments, the anodic polarization curves of carbon steel in buffer material were active dissolution type, and the corrosion type of carbon steel in Horonobe groundwater environment was expected to be general corrosion. The results of immersion test under air equilibrium condition showed that the degrees of corrosion localization were not exceeded the data obtained in previous studies. The trend of corrosion rates in buffer material under anaerobic condition were similar to the data obtained in previous studies. Based on the experimental results, it was confirmed that the corrosion assessment model and assumed corrosion rate in second progress report (H12 report) can be applied to the assessment for Horonobe groundwater condition. (author)

  13. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada: Volume 1

    International Nuclear Information System (INIS)

    1987-08-01

    Environmental protection during the course of siting and constructing a repository is mandated by NWPA in conjunction with various phases of repository siting and development. However, DOE has issued no comprehensive, integrated plan for environmental protection. Consequently, it is unclear how DOE will accomplish environmental assessment, monitoring, impact mitigation, and site reclamation. DOE should, therefore, defer further implementation of its current characterization program until a comprehensive environmental protection plan is available. To fulfill its oversight responsibilities the State of Nevada has proposed a comprehensive environmental program for the Yucca Mountain site that includes immediately undertaking studies to establish a 12-month baseline of environmental information at the site; adopting the DOE Site Characterization Plan (SCP) and the engineering design plans it will contain as the basis for defining the impact potential of site characterization activities; using the environmental baseline and the SCP to evaluate the efficacy of the preliminary impact analyses reported by DOE in the EA; using the SCP as the basis for discussions with federal, state, and local regulatory authorities to decide which environmental requirements apply and how they can be complied with; using the SCP, the EA impact review, and the compliance requirements to determine the scope of reclamation measures needed; and developing environmental monitoring and impact mitigation plans based on the EA impact review, compliance requirements, and anticipated reclamation needs

  14. Chinese engineers and scientists urge leadership to change Three Gorges Dam operating plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-04-26

    An appeal to the Chinese Leadership by a group of senior engineers, water management experts and academics about the dire consequences of filling the Three Gorges reservoir on the Yangtze River to 175 metres, is reported. Originally, the plan was to keep water levels behind the Three Gorges Dam at 156 metres for the first ten years of operation, in order to allow for resettlement of people displaced by building the dam, and to evaluate the impact of silt deposits on navigation and ports at the upper end of the reservoir. Plans have changed in 1997; the water level is now scheduled to rise to 175 metres in the sixth year of the dam's operation in order to maximize the dam's power output. The appeal by 53 experts warned the Chinese Government that the filling of the reservoir to 175 metres would displace 1.13 million people and raise the water level in the Yangtze River more than 10 metres at Chongqing City, submerging drainage outlets and backing up the city's sewage, as well as increase silt deposits, blocking shipping traffic along the Yangtze River. A parallel is drawn with the Sanmenxia Dam on the Yellow River. It was completed in 1960; it has proven to be useless for controlling floods while producing only one-third of its expected output due to massive silt build-up in the reservoir.

  15. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  16. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  17. Advanced Propulsion System Studies for General Aviation Aircraft

    Science.gov (United States)

    Eisenberg, Joseph D. (Technical Monitor); German, Jon

    2003-01-01

    This final report addresses the following topics: Market Impact Analysis (1) assessment of general aviation, including commuter/regional, aircraft market impact due to incorporation of advanced technology propulsion system on acquisition and operating costs, job creation and/or manpower demand, and future fleet size; (2) selecting an aircraft and engine for the study by focusing on the next generation 19-passenger commuter and the Williams International FJ44 turbofan engine growth. Propulsion System Analysis Conducted mission analysis studies and engine cycle analysis to define a new commuter mission and required engine performance, define acquisition and operating costs and, select engine configuration and initiated preliminary design for hardware modifications required. Propulsion System Benefits (1) assessed and defined engine emissions improvements, (2) assessed and defined noise reduction potential and, (3) conducted a cost analysis impact study. Review of Relevant NASA Programs Conducted literature searches using NERAC and NASA RECON services for related technology in the emissions and acoustics area. Preliminary Technology Development Plans Defined plan to incorporate technology improvements for an FJ44-2 growth engine in performance, emissions, and noise suppression.

  18. Preliminary design report for prototypical spent nuclear fuel rod consolidation equipment

    International Nuclear Information System (INIS)

    Judson, B.F.; Maillet, J.; O'Neill, G.L.; Tsitsichvili, J.; Tucoulat, D.

    1986-12-01

    The purpose of the Prototypical Consolidation Demonstration Project (PCDP) is to develop and demonstrate the equipment system that will be used to consolidate the bulk of the spent nuclear fuel generated in the United States prior to its placement in a geological repository. The equipment must thus be capable of operating on a routine production basis over a long period of time with stringent requirements for safety, reliability, productivity and cost-effectiveness. Four phases are planned for the PCDP. Phase 1 is the Preliminary Design of generic consolidation equipment that could be installed at a Monitored Retrievable Storage (MRS) facility or in the Receiving ampersand Handling Facility at a geologic repository site. Phase 2 will be the Final Design and preparation of procurement packages for the equipment in a configuration capable of being installed and tested in a special enclosure within the TAN Hot Shop at DOE's Idaho National Engineering Laboratory. In Phase 3 the equipment will be fabricated and then tested with mock fuel elements in a contractor's facility. Finally, in Phase 4 the equipment will be moved to the TAN facility for demonstration operation with irradiated spent fuel elements. 55 figs., 15 tabs

  19. First-Year Engineering Students' Portrayal of Engineering in a Proposed Museum Exhibit for Middle School Students

    Science.gov (United States)

    Mena, Irene B.; Diefes-Dux, Heidi A.

    2012-04-01

    Students' perceptions of engineering have been documented through studies involving interviews, surveys, and word associations that take a direct approach to asking students about various aspects of their understanding of engineering. Research on perceptions of engineering rarely focuses on how students would portray engineering to others. First-year engineering student teams proposed a museum exhibit, targeted to middle school students, to explore the question "What is engineering?" The proposals took the form of a poster. The overarching research question focuses on how these students would portray engineering to middle school students as seen through their museum exhibit proposals. A preliminary analysis was done on 357 posters to determine the overall engineering themes for the proposed museum exhibits. Forty of these posters were selected and, using open coding, more thoroughly analyzed to learn what artifacts/objects, concepts, and skills student teams associate with engineering. These posters were also analyzed to determine if there were any differences by gender composition of the student teams. Building, designing, and teamwork are skills the first-year engineering students link to engineering. Regarding artifacts, students mentioned those related to transportation and structures most often. All-male teams were more likely to focus on the idea of space and to mention teamwork and designing as engineering skills; equal-gender teams were more likely to focus on the multidisciplinary aspect of engineering. This analysis of student teams' proposals provides baseline data, positioning instructors to develop and assess instructional interventions that stretch students' self-exploration of engineering.

  20. Screw expander for light duty diesel engines

    Science.gov (United States)

    1983-01-01

    Preliminary selection and sizing of a positive displacement screw compressor-expander subsystem for a light-duty adiabatic diesel engine; development of a mathematical model to describe overall efficiencies for the screw compressor and expander; simulation of operation to establish overall efficiency for a range of design parameters and at given engine operating points; simulation to establish potential net power output at light-duty diesel operating points; analytical determination of mass moments of inertia for the rotors and inertia of the compressor-expander subsystem; and preparation of engineering layout drawings of the compressor and expander are discussed. As a result of this work, it was concluded that the screw compressor and expander designed for light-duty diesel engine applications are viable alternatives to turbo-compound systems, with acceptable efficiencies for both units, and only a moderate effect on the transient response.

  1. Business process re-engineering in service operations

    International Nuclear Information System (INIS)

    McClintock, J.W.

    1995-01-01

    The concept of business process re-engineering, and how it was applied to the operations of the Consumers Gas Company were discussed. Business process re-engineering was defined as the improvement of the efficiency of the customer-service process, and the overall improvement of practices and operations. The re-engineering project was said to involve a thorough analysis of information technology, current limitations, and business operational needs, undertaken on an enterprise-wide basis. Viewed generically,a re-engineering project was said to have six major components: (1) business drivers (i.e. the articulation of the Company's strategic issues); (2) benchmark measures; (3) future state process models; (4) cost/benefit analysis; (5) a change management plan; and (6) a development plan. Business improvements expected to result from the project include reduced cost of operation, reduction of waste, and a substantially complete re-design of the business process. Management of the project involved a team approach, and help of a consultant to identify the scope of the re-design, its limitations, and future state. A life expectancy of approximately 10 years was given for the re-engineering plan, with annual benefits (in terms of cost reduction) of $4.6 million by the year 2000

  2. Forming engineers' sociocultural competence: Engineering ethics at tomsk polytechnic university

    Science.gov (United States)

    Galanina, E.; Dulzon, A.; Schwab, A.

    2015-10-01

    The aim of the present research is to discuss Tomsk Polytechnic University in respect of forming engineers’ sociocultural competence and teaching engineering ethics. Today international standards of training engineers cover efficient communication skills, ability to understand societal and environment context, professional and ethical responsibility. This article deals with the problem of contradiction between the need to form engineers’ sociocultural competence in Russian higher education institutions in order to meet the requirements of international accreditation organizations and the real capabilities of existing engineering curricula. We have described ethics teaching experience of TPU, studied the engineering master programs of TPU to see how the planned results are achieved. We have also given our recommendations to alter the structure of TPU educational curricula, which can also be applied in other higher education institutions.

  3. Advanced supersonic propulsion study, phases 3 and 4. [variable cycle engines

    Science.gov (United States)

    Allan, R. D.; Joy, W.

    1977-01-01

    An evaluation of various advanced propulsion concepts for supersonic cruise aircraft resulted in the identification of the double-bypass variable cycle engine as the most promising concept. This engine design utilizes special variable geometry components and an annular exhaust nozzle to provide high take-off thrust and low jet noise. The engine also provides good performance at both supersonic cruise and subsonic cruise. Emission characteristics are excellent. The advanced technology double-bypass variable cycle engine offers an improvement in aircraft range performance relative to earlier supersonic jet engine designs and yet at a lower level of engine noise. Research and technology programs required in certain design areas for this engine concept to realize its potential benefits include refined parametric analysis of selected variable cycle engines, screening of additional unconventional concepts, and engine preliminary design studies. Required critical technology programs are summarized.

  4. NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

    Science.gov (United States)

    Smith, David A.; Smith, John V.

    2010-01-01

    The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics

  5. The MEOW lunar project for education and science based on concurrent engineering approach

    Science.gov (United States)

    Roibás-Millán, E.; Sorribes-Palmer, F.; Chimeno-Manguán, M.

    2018-07-01

    The use of concurrent engineering in the design of space missions allows to take into account in an interrelated methodology the high level of coupling and iteration of mission subsystems in the preliminary conceptual phase. This work presents the result of applying concurrent engineering in a short time lapse to design the main elements of the preliminary design for a lunar exploration mission, developed within ESA Academy Concurrent Engineering Challenge 2017. During this program, students of the Master in Space Systems at Technical University of Madrid designed a low cost satellite to find water on the Moon south pole as prospect of a future human lunar base. The resulting mission, The Moon Explorer And Observer of Water/Ice (MEOW) compromises a 262 kg spacecraft to be launched into a Geostationary Transfer Orbit as a secondary payload in the 2023/2025 time frame. A three months Weak Stability Boundary transfer via the Sun-Earth L1 Lagrange point allows for a high launch timeframe flexibility. The different aspects of the mission (orbit analysis, spacecraft design and payload) and possibilities of concurrent engineering are described.

  6. Vasectomy: preliminary report on 25 cases.

    Science.gov (United States)

    Lema, V M; Makokha, A E

    1989-05-01

    Preliminary data on 25 men who underwent vasectomy for contraception between June 1986 and May 1988 at the Marie Stopes Clinic--Nairobi is presented. The majority (76.0%) of the subjects were aged between 25 and 39 years. 68.0% had 4 living children or less. Professionals including lecturers, lawyers, teachers, engineers etc, formed 88.0% of the total. Three clients(12.0%) had documented complications; one had aseptic wound, one had haematoma and the last one had a failed vasectomy. All were treated successfully. Complications of vasectomy and the need for follow-up of vasectomised men are discussed.

  7. Environmental Survey preliminary report, Strategic Petroleum Reserve, Texas and Louisiana Gulf Coast

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR), located in Louisiana and Texas, and conducted in two segments from November 30 through December 11, 1987, and February 1 through 10, 1988. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SPR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at SPR, and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the SPR Survey findings for inclusion into the Environmental Survey Summary Report. The Summary Report will reflect the final determinations of the SPR Survey and the other DOE site-specific Surveys. 200 refs., 50 figs., 30 tabs.

  8. Site study plan for EDBH [Engineering Design Boreholes] No. 1 and 2: Revision 1

    International Nuclear Information System (INIS)

    1987-12-01

    This site study plan describes the Engineering Design Boreholes 1 and 2 field activities to be conducted during early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from federal/state/local regulations and repository program requirements. A borehole will be drilled at the centerline of each of the planned exploratory shaft locations. The subsurface rock and fluids will be sampled as the boreholes are advanced to total depth of about 2600 ft. Continuous rock core will be taken below the base of the Dockum Group. Hydrologic testing will occur in units thought to be water bearing and in units of particular interest for shaft seals. Field methods/tests are chosen that provide the best or only means of obtaining the required data. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. Drilling will not begin until after site ground-water baseline conditions have been established. The Technical Field Services Contractor is responsible for conducting the field program of drilling and testing. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 28 refs., 10 figs., 4 tabs

  9. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

    2007-02-01

    federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

  10. Ship design methodologies of preliminary design

    CERN Document Server

    Papanikolaou, Apostolos

    2014-01-01

    This book deals with ship design and in particular with methodologies of the preliminary design of ships. The book is complemented by a basic bibliography and five appendices with useful updated charts for the selection of the main dimensions and other basic characteristics of different types of ships (Appendix A), the determination of hull form  from the data of systematic hull form series (Appendix B), the detailed description of the relational method for the preliminary estimation of ship weights (Appendix C), a brief review of the historical evolution of shipbuilding science and technology from the prehistoric era to date (Appendix D) and finally a historical review of regulatory developments of ship's damage stability to date (Appendix E).  The book can be used as textbook for ship design courses or as additional reading for university or college students of naval architecture courses and related disciplines; it may also serve as a reference book for naval architects, practicing engineers of rel...

  11. Implementing of action plans for risk communication on the uranium mining sites remedy at Ningyo-toge Environmental Engineering Center (2) (Contract research)

    International Nuclear Information System (INIS)

    Yabuta, Naohiro; Kawai, Jun; Hikawa, Tamae; Tokizawa, Takayuki; Sato, Kazuhiko; Koga, Osamu

    2008-11-01

    On the closure of uranium mine site at Ningyo-Toge Environmental Engineering Center Japan Atomic Energy Agency, the action plans for risk communication with residence and local governments were developed and implemented. Under a practical program of the risk communication, an ethnographical research on Ningyo-Toge Environmental Engineering Center has been conducted by local high school students. The research was focused on several social groups such as engineers at the Center and residents around Ningyo-Toge and described their circumstances from the past to the present, since the discovery of the uranium outcrop 1955. In the second year of the program, the results of the research were presented at symposium and the students had opportunities to exchange their views with others from different high schools that held in similar programs. Through those activities, the importance of the program was rediscovered and some new issues were also identified. (author)

  12. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  13. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    Energy Technology Data Exchange (ETDEWEB)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.

  14. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  15. [PRELIMINARY APPLICATION OF VIRTUAL PREOPERATIVE RECONSTRUCTION PLANNING IN Pilon FRACTURES].

    Science.gov (United States)

    Wang Xiaoping; Wei, Zhantu; Huang, Jian; Chen, Luyao; Hu, Shiqiang; Wu, Weiwei; Tu, Yumin; Guo, Sheng; Xu, Guotai; Deng, Zhicheng

    2016-01-01

    To investigate the application value of three-dimensional reconstruction and virtual preoperative planning for Pilon fractures. Between July 2010 and June 2014, 16 patients with closed Pilon fracture were treated, including 12 males and 4 females with an average age of 36.5 years (range, 22-53 years) and a mean disease duration of 10.2 days (range, 6-14 days). According to AO/Orthopaedic Trauma Association (AO/OTA) typing, 2 cases were rated as 43.B2 type, 3 cases as 43.B3 type, 3 cases as 43.C1 type, 2 cases as 43.C2 type, and 6 cases as 43.C3 type. The preoperative CT data from 16 patients were imported into Mimics10.01 software to establish the detailed fracture three-dimensional digital models. Virtual operation of fracture reduction and implanting internal fixation was performed on the models, and the optional surgical planning was made. Based on the virtual preoperative planning, operations were performed. Established detailed three-dimensional Pilon fracture digital models could perfectly reflect the fracture characteristics, could be observed at any direction, and aided for fracture classification accurately. Virtual fracture operations of reduction, internal fixation and other could be performed to simulate the clinical operation, which could assist the surgeon better preoperative planning in achieving visual presentation and improving the communication. The operation time was 70-130 minutes (mean, 87.8 minutes); intraoperative blood loss volume was 30-150 mL (mean, 71.9 mL). The wounds healed by first intension in all patients. The mean follow-up time was 11.6 months (range, 8-18 months). Postoperative radiological results at 3 groups showed good anatomic reduction according to the Burwell-Charnley criteria, and the fracture healing time was 3-6 months (mean, 3.7 months). There was no complication of internal fixation loosening or breakage during follow-up. The American Orthopedic Foot and Ankle Society (AOFAS) score was 71-100 (mean, 92.3); the results

  16. A plan for the modification and assessment of TRAC-PF1/MOD2 for use in analyzing CANDU 3 transient thermal-hydraulic phenomena

    International Nuclear Information System (INIS)

    Siebe, D.A.; Boyack, B.E.; Giguere, P.T.

    1994-11-01

    This report presents the results of the review and planning done for the United States Nuclear Regulatory Commission to identify the thermal-hydraulic phenomena that could occur in the CANDU 3 reactor design during transient conditions, plan modifications to the TRAC-PF1/MOD2 (TRAC) computer code needed to adequately predict CANDU 3 transient thermal-hydraulic phenomena, and identify an assessment program to verify the ability of TRAC, when modified, to predict these phenomena. This work builds on analyses and recommendations produced by the Idaho National Engineering Laboratory (INEL). To identify the thermal-hydraulic phenomena, a large-break loss-of-coolant accident simulation, performed as part of earlier work by INEL with an Atomic Energy of Canada, Limited (AECL) thermal-hydraulic computer code (CATHENA), was analyzed in detail. Other accident scenarios were examined for additional phenomena. A group of Los Alamos National Laboratory reactor thermal-hydraulics experts ranked the phenomena to produce a preliminary phenomena identification and ranking table (PIRT). The preliminary nature of the PIRT was a result of a lack of direct expertise with the unique processes and phenomena of the CANDU 3. Nonetheless, this PIRT provided an adequate foundation for planning a program of code modifications. We believe that this PIRT captured the most important phenomena and that refinements to the PIRT will mainly produce clarification of the relative importance (ranking) of phenomena. A plan for code modifications was developed based on this PIRT and on information about the modeling methodologies for CANDU-specific phenomena used in AECL codes. AECL thermal-hydraulic test facilities and programs were reviewed and the information used in developing an assessment plan to ensure that TRAC-PF1/MOD2, when modified, will adequately predict CANDU 3 phenomena

  17. Software engineering

    CERN Document Server

    Sommerville, Ian

    2016-01-01

    For courses in computer science and software engineering The Fundamental Practice of Software Engineering Software Engineering introduces readers to the overwhelmingly important subject of software programming and development. In the past few years, computer systems have come to dominate not just our technological growth, but the foundations of our world's major industries. This text seeks to lay out the fundamental concepts of this huge and continually growing subject area in a clear and comprehensive manner. The Tenth Edition contains new information that highlights various technological updates of recent years, providing readers with highly relevant and current information. Sommerville's experience in system dependability and systems engineering guides the text through a traditional plan-based approach that incorporates some novel agile methods. The text strives to teach the innovators of tomorrow how to create software that will make our world a better, safer, and more advanced place to live.

  18. Engineering, environmental and economic planning for tailings disposal

    International Nuclear Information System (INIS)

    Poellot, J.H.

    1982-01-01

    There are two principal points made in this paper. First, mining waste materials, or tailings, are geotechnical materials. Their behavior follows the principles of soil mechanics and is predictable by these principles. Second, proper disposal, meaning safe, environmentally sound and economical disposal, requires planning and recognizing waste disposal as part of the total mining system and process. In the development of these two principles, planning, design, and economic considerations of mine tailings are discussed

  19. WECC Variable Generation Planning Reference Book

    Energy Technology Data Exchange (ETDEWEB)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-14

    This planning reference book is a document reflecting a Western Electricity Coordination Council (WECC) effort to put together multiple sources of information and provide a clear, systemic, comprehensive outline of the problems, both existing and anticipated; their impacts on the system; currently used and proposed solutions by the industry and research community; planning practices; new technologies, equipment, and standards; and expected future trends. This living (periodically updated) document could help WECC and other practicing engineers, especially the younger generation of engineers joining the workforce, to get familiar with a large variety of information related to the integration of variable resources into the WECC system, bypassing in part the need for time-consuming information gathering and learning processes from more experienced engineers or from the literature.

  20. Long-range plan for buried transuranic waste studies at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Low, J.O.

    1985-12-01

    This document presents a plan to perform detailed studies of alternatives considered for the long-term management of buried transuranic waste at the Idaho National Engineering Laboratory (INEL). The studies will provide the technical basis for DOE to make a decision on the future management of that waste. Although the waste is currently being handled in an acceptable manner, new solutions are continually being researched to improve management techniques. Three alternatives are being considered: (a) leave the waste as is; (b) improve in situ confinement of the waste; and (c) retrieve, process, and certify the waste for disposal at a federal repository. Fourteen studies are described in this plan for Alternatives 2 and 3. The leave-as-is alternative involves continuing present procedures for managing the buried waste. An ongoing environmental surveillance program, a low-level-waste stabilization program, and enhanced subsurface migration studies begun in FY-1984 at the INEL will provide data for the decision-making process for the INEL buried TRU waste. These ongoing studies for the leave-as-is alternative are summarized in this plan in limited detail. The improved-confinement alternative involves leaving the waste in place, but providing additional protection against wind, water penetration, erosion, and plant and animal intrusion. Several studies proposed under this alternative will examine special techniques to immobilize or encapsulate the buried waste. An in situ grouting study was implemented at the INEL starting in FY-1985 and will be completed at the end of FY-1986 with the grouting of a simulated INEL buried TRU waste trench. Studies of the third alternative will investigate improved retrieval, processing, and certification techniques. New equipment, such as industrial manipulators and excavating machinery, will be tested in the retrieval studies. Processing and certification studies will examine rapidly changing or new technologies