WorldWideScience

Sample records for pre-pump installation baseline

  1. Environmental Baseline Survey for Installation of Five New Hydrogeologic Groundwater Monitoring Wells

    Energy Technology Data Exchange (ETDEWEB)

    Catechis, Christopher S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Phase I Environmental Baseline Survey (EBS) provides the findings of a survey and assessment for termination of an existing easement granted to the Department of Energy (DOE) for the installation of 5 new hydrogeologic groundwater monitoring wells located on KAFB, New Mexico. The purpose of this EBS is to: Document the nature, magnitude, and extent of any environmental contamination of the property. Identify potential environmental contamination liabilities associated with the property. Develop sufficient information to assess the health and safety risks. Ensure adequate protection for human health and the environment related to a specific property. Determine possible effects of contamination on property valuation, and serve as the basis for notice of environmental condition for applicable federal or local real property disclosure requirements.

  2. Pre-pumped passively Q-switched Nd:YAG/Cr:YAG microchip laser

    Institute of Scientific and Technical Information of China (English)

    Xinning Tian(田信宁); Ping Yan(闫平); Qiang Liu(柳强); Mali Gong(巩马理); Yun Liao(廖云)

    2004-01-01

    A pre-pumped passively Q-switched Nd:YAG/Cr:YAG microchip laser is demonstrated with a peak power of 7.5 kW at pulse repetition rate of serveral kilohertzs. The full-width at half-maximum(FWHM)is 734 ps, and the pulse energy is 5.5 μJ with a fundamental spatial mode. In this system, the pre-pumped microchip laser of Nd:YAG/Cr:YAG wafer which is bonded through the thermal-bonding technique has achieved a time jitter value of 12 μs and a Q-switched amplitude instability of 1.26%(15)through the pre-pumped modulation technique.

  3. Environmental settings for selected US Department of Energy installations - support information for the programmatic environmental impact statement and the baseline environmental management report

    Energy Technology Data Exchange (ETDEWEB)

    Holdren, G.R.; Glantz, C.S.; Berg, L.K.; Delinger, K.; Fosmire, C.J.; Goodwin, S.M.; Rustad, J.R.; Schalla, R.; Schramke, J.A.

    1995-05-01

    This report contains the environmental setting information developed for 25 U.S. Department of Energy (DOE) installations in support of the DOE`s Programmatic Environmental Impact Study (PEIS) and the Baseline Environmental Management Report (BEMR). The common objective of the PEIS and the BEMR is to provide the public with information about the environmental contamination problems associated with major DOE facilities across the country, and to assess the relative risks that radiological and hazardous contaminants pose to the public, onsite workers, and the environment. Environmental setting information consists of the site-specific data required to model (using the Multimedia Environmental Pollutant Assessment System) the atmospheric, groundwater, and surface water transport of contaminants within and near the boundaries of the installations. The environmental settings data describes the climate, atmospheric dispersion, hydrogeology, and surface water characteristics of the installations. The number of discrete environmental settings established for each installation was governed by two competing requirements: (1) the risks posed by contaminants released from numerous waste sites were to be modeled as accurately as possible, and (2) the modeling required for numerous release sites and a large number of contaminants had to be completed within the limits imposed by the PEIS and BEMR schedule. The final product is the result of attempts to balance these competing concerns in a way that minimizes the number of settings per installation in order to meet the project schedule while at the same, time providing adequate, if sometimes highly simplified, representations of the different areas within an installation. Environmental settings were developed in conjunction with installation experts in the fields of meteorology, geology, hydrology, and geochemistry.

  4. Final design, installation and baseline testing of 500 kW direct contact pilot plant at East Mesa

    Energy Technology Data Exchange (ETDEWEB)

    Hlinak, A.; Lobach, J.; Nichols, K.; Olander, R.; Werner, D.

    1980-05-30

    The pilot plant was configured to accomplish two objectives - first to evaluate the overall performance potential of direct contact powerplants and second to develop design criteria and parameters for full-scale direct contact plants. The pilot plant includes all of the process functions that would be incorporated in a full-scale plant. Incoming brine is treated to remove undissolved gases, pumped through the direct contact heat exchanger (DCHX), and then sent to a recovery system for removal of the dissolved working fluid. The chosen working fluid is isobutane (IC/sub 4/). The working fluid loop includes a radial inflow turbine with generator, condensers, hot-well reservoir, and a feed pump. A downwell pump was installed in the geothermal well to supply the plant with unflashed brine. (MHR)

  5. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  6. Baseline rationing

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moreno-Ternero, Juan D.; Østerdal, Lars Peter Raahave

    The standard problem of adjudicating conflicting claims describes a situation in which a given amount of a divisible good has to be allocated among agents who hold claims against it exceeding the available amount. This paper considers more general rationing problems in which, in addition to claims......, there exist baselines (to be interpreted as objective entitlements, ideal targets, or past consumption) that might play an important role in the allocation process. The model we present is able to accommodate real-life rationing situations, ranging from resource allocation in the public health care sector...... to international protocols for the reduction of greenhouse emissions, or water distribution in drought periods. We define a family of allocation methods for such general rationing problems - called baseline rationing rules - and provide an axiomatic characterization for it. Any baseline rationing rule within...

  7. Potential Danger of Pre-Pump Clamping on Negative Pressure-Associated Gaseous Microemboli Generation During Extracorporeal Life Support--An In Vitro Study.

    Science.gov (United States)

    Wang, Shigang; Chin, Brian J; Gentile, Frank; Kunselman, Allen R; Palanzo, David; Ündar, Akif

    2016-01-01

    The objectives of this study were to investigate the relationship between revolution speed of a conventional centrifugal pump and negative pressure at the inlet of the pump by clamping the tubing upstream of the pump, and to verify whether negative pressure leads to gaseous microemboli (GME) production in a simulated adult extracorporeal life support (ECLS) system. The experimental circuit, including a Maquet Rotaflow centrifugal pump and a Medos Hilite 7000 LT polymethyl-pentene membrane oxygenator, was primed with packed red blood cells (hematocrit 35%). Negative pressure was created in the circuit by clamping the tubing upstream of the pump for 10 s, and then releasing the clamp. An emboli detection and classification quantifier was used to record GME volume and count at pre-oxygenator and post-oxygenator sites, and pressure and flow rate data were collected using a custom-based data acquisition system. All trials were conducted at 36°C at revolution speeds of 2000-4000 rpm (500 rpm increment). The flow rates were 1092.5-4708.4 mL/min at the revolution speeds of 2000-4000 rpm. Higher revolution speed generated higher negative pressure at the pre-pump site when clamping the tubing upstream of the pump (-108.3 ± 0.1 to -462.0 ± 0.5 mm Hg at 2000-4000 rpm). Moreover, higher negative pressure was associated with a larger number and volume of GME at pre-oxygenator site after de-clamp (GME count 10,573 ± 271 at pre-oxygenator site at 4000 rpm). The results showed that there was a potential danger of delivering GME to the patient when clamping pre-pump tubing during ECLS using a centrifugal pump. Our results warrant further clinical studies to investigate this phenomenon.

  8. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  9. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  10. Temperature-dependent strain and temperature sensitivities of fused silica single mode fiber sensors with pulse pre-pump Brillouin optical time domain analysis

    Science.gov (United States)

    Bao, Yi; Chen, Genda

    2016-06-01

    This paper reports a distributed temperature and strain sensor based on pulse pre-pump Brillouin optical time domain analysis. An uncoated, telecom-grade fused silica single-mode fiber as a distributed sensor was calibrated for its sensitivity coefficients under various strains and temperatures up to 800 °C. The Brillouin frequency of fiber samples changed nonlinearly with temperature and linearly with strain. The temperature sensitivity decreased from 1.113 to 0.830 MHz /°C in the range of 22-800 °C. The strain sensitivity was reduced from 0.054 to 0.042 MHz /μɛ as the temperature increased from 22 to 700 °C and became unstable at higher temperatures due to creep effect. The strain measurement range was reduced from 19 100 to 6000 μɛ in the temperature range of 22-800 °C due to fused silica’s degradation. The calibrated fiber optic sensor demonstrated adequate accuracy and precision for strain and temperature measurements and stable performance in heating-cooling cycles. It was validated in an application setting.

  11. Questa baseline and pre-mining ground-water quality investigation. 5. Well installation, water-level data, and surface- and ground-water geochemistry in the Straight Creek drainage basin, Red River Valley, New Mexico, 2001-03

    Science.gov (United States)

    Naus, Cheryl A.; McCleskey, R. Blaine; Nordstrom, D. Kirk; Donohoe, Lisa C.; Hunt, Andrew G.; Paillet, Frederick L.; Morin, Roger H.; Verplanck, Philip L.

    2005-01-01

    The U.S. Geological Survey, in cooperation with the New Mexico Environment Department, is investigating the pre-mining ground-water chemistry at the Molycorp molybdenum mine in the Red River Valley, northern New Mexico. The primary approach is to determine the processes controlling ground-water chemistry at an unmined, off-site, proximal analog. The Straight Creek drainage basin, chosen for this purpose, consists of the same quartz-sericite-pyrite altered andesitic and rhyolitic volcanic rock of Tertiary age as the mine site. The weathered and rugged volcanic bedrock surface is overlain by heterogeneous debris-flow deposits that interfinger with alluvial deposits near the confluence of Straight Creek and the Red River. Pyritized rock in the upper part of the drainage basin is the source of acid rock drainage (pH 2.8-3.3) that infiltrates debris-flow deposits containing acidic ground water (pH 3.0-4.0) and bedrock containing water of circumneutral pH values (5.6-7.7). Eleven observation wells were installed in the Straight Creek drainage basin. The wells were completed in debris-flow deposits, bedrock, and interfingering debris-flow and Red River alluvial deposits. Chemical analyses of ground water from these wells, combined with chemical analyses of surface water, water-level data, and lithologic and geophysical logs, provided information used to develop an understanding of the processes contributing to the chemistry of ground water in the Straight Creek drainage basin. Surface- and ground-water samples were routinely collected for determination of total major cations and selected trace metals; dissolved major cations, selected trace metals, and rare-earth elements; anions and alkalinity; and dissolved-iron species. Rare-earth elements were determined on selected samples only. Samples were collected for determination of dissolved organic carbon, mercury, sulfur isotopic composition (34S and 18O of sulfate), and water isotopic composition (2H and 18O) during

  12. SRP baseline hydrogeologic investigation, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Bledsoe, H.W.

    1987-11-01

    As discussed in the program plan for the Savannah River Plant (SRP) Baseline Hydrogeologic Investigation, this program has been implemented for the purpose of updating and improving the current state of knowledge and understanding of the hydrogeologic systems underlying the Savannah River Plant (SRP). The objective of the program is to install a series of observation well clusters (wells installed in each major water bearing formation at the same site) at key locations across the plant site in order to: (1) provide detailed information on the lithology, stratigraphy, and groundwater hydrology, (2) provide observation wells to monitor the groundwater quality, head relationships, gradients, and flow paths.

  13. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  14. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  15. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  16. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  17. FED baseline engineering studies report

    Energy Technology Data Exchange (ETDEWEB)

    Sager, P.H.

    1983-04-01

    Studies were carried out on the FED Baseline to improve design definition, establish feasibility, and reduce cost. Emphasis was placed on cost reduction, but significant feasibility concerns existed in several areas, and better design definition was required to establish feasibility and provide a better basis for cost estimates. Design definition and feasibility studies included the development of a labyrinth shield ring concept to prevent radiation streaming between the torus spool and the TF coil cryostat. The labyrinth shield concept which was developed reduced radiation streaming sufficiently to permit contact maintenance of the inboard EF coils. Various concepts of preventing arcing between adjacent shield sectors were also explored. It was concluded that installation of copper straps with molybdenum thermal radiation shields would provide the most reliable means of preventing arcing. Other design studies included torus spool electrical/structural concepts, test module shielding, torus seismic response, poloidal conditions in the magnets, disruption characteristics, and eddy current effects. These additional studies had no significant impact on cost but did confirm the feasibility of the basic FED Baseline concept.

  18. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  19. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article...... contributes to the understanding of the distinctive characteristics of such a new medium, and identifies three strategies for designing 3-D projection installations: establishing space; interplay between the digital and the physical; and transformation of materiality. The principal empirical case, From...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  20. BEAM PIPE IS INSTALLED

    CERN Multimedia

    The installation of the central section of the beam pipe into the heart of the  CMS was completed by 23 April. All the beam pipe elements have been successfully vacuum-tested and the bakeout started.  

  1. ECAL BARREL INSTALLED

    CERN Multimedia

    An important milestone was reached with the installation and test of the 36th ECAL Barrel Supermodule, completed July 27th.  The quality is exceptional: all but 28 of the 61200 channels are functional.    

  2. Installation af opvaskemaskine

    DEFF Research Database (Denmark)

    Christiansen, J.; Skibstrup Eriksen, S.; Nielsen, F.

    Denne SBI-anvisning er et led i en serie om modernisering af installationerne i den ældre boligmasse. Den henvender sig til både beboere, husejere, VVS-installatører og andre interesserede. Anvisningen indeholder almene afsnit om valg og placering af opvaskemaskine, sagsforløb ved installation......, forhold til myndigheder, priser, finansieringsmuligheder m.m. Anvisningen indeholder endvidere tekniske afsnit om vandinstallation, afløb og elinstallation i forbindelse med installation af opvaskemaskine....

  3. Installing the World

    Institute of Scientific and Technical Information of China (English)

    1998-01-01

    THE art of installation is an art about concept," explains Qing Qing Chen. The artist wants her audience to look at the development of aesthetics from a pluralistic angle on life. Unlike the expressive format of "art in the frame," the art of installation belongs to the category of "non-framed art." The choice of materials used is as important to expression as the creator’s ideas. Whereas only certain materials can be

  4. Complex biopower installation

    Directory of Open Access Journals (Sweden)

    Tirshu M.

    2008-12-01

    Full Text Available It is presented the technological scheme of complex biopower installation for manufacture of the electric power, hot water and gas at use as raw material of manure, birds dung and firm organic waste products. The suggested technical solution provides practically 100 % use of energy of burnt gas due to the introduced feedback between power station and a bioreactor. Recommendations for the best use of installation in Republics Moldova are developed as well.

  5. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  6. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  7. Electricity Generation Baseline Report

    Energy Technology Data Exchange (ETDEWEB)

    Logan, Jeffrey [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcy, Cara [National Renewable Energy Lab. (NREL), Golden, CO (United States); McCall, James [National Renewable Energy Lab. (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bloom, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aabakken, Jorn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jenkin, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Porro, Gian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Liu, Chang [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ganda, Francesco [Argonne National Lab. (ANL), Argonne, IL (United States); Boardman, Richard [Idaho National Lab. (INL), Idaho Falls, ID (United States); Tarka, Thomas [National Energy Technology Lab. (NETL), Albany, OR (United States); Brewer, John [National Energy Technology Lab. (NETL), Albany, OR (United States); Schultz, Travis [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2017-01-01

    This report was developed by a team of national laboratory analysts over the period October 2015 to May 2016 and is part of a series of studies that provide background material to inform development of the second installment of the Quadrennial Energy Review (QER 1.2). The report focuses specifically on U.S. power sector generation. The report limits itself to the generation sector and does not address in detail parallel issues in electricity end use, transmission and distribution, markets and policy design, and other important segments. The report lists 15 key findings about energy system needs of the future.

  8. Electrical installation technology

    CERN Document Server

    Neidle, Michael

    1982-01-01

    Electrical Installation Technology, Third Edition covers the wide range of subjects that come under the headings of electrical science, installations, and regulations. The book discusses electromagnetism; inductance; static electricity; d.c. circuits; voltage drop and current rating; distribution; and wiring techniques. The text also describes o.c. motors and generators; a.c. motors, transformers; power-factor improvement; earthing and earth-leakage protection; testing; illumination; and the general principles of temperature and heat. Communication systems and equipment; electronics; and site

  9. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  10. Magic Baseline Beta Beam

    CERN Document Server

    Agarwalla, Sanjib Kumar; Raychaudhuri, Amitava

    2007-01-01

    We study the physics reach of an experiment where neutrinos produced in a beta-beam facility at CERN are observed in a large magnetized iron calorimeter (ICAL) at the India-based Neutrino Observatory (INO). The CERN-INO distance is close to the so-called "magic" baseline which helps evade some of the parameter degeneracies and allows for a better measurement of the neutrino mass hierarchy and $\\theta_{13}$.

  11. Rationing with baselines

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moreno-Ternero, Juan D.; Østerdal, Lars Peter Raahave

    2013-01-01

    We introduce a new operator for general rationing problems in which, besides conflicting claims, individual baselines play an important role in the rationing process. The operator builds onto ideas of composition, which are not only frequent in rationing, but also in related problems...... such as bargaining, choice, and queuing. We characterize the operator and show how it preserves some standard axioms in the literature on rationing. We also relate it to recent contributions in such literature....

  12. The TDAQ Baseline Architecture

    CERN Multimedia

    Wickens, F J

    The Trigger-DAQ community is currently busy preparing material for the DAQ, HLT and DCS TDR. Over the last few weeks a very important step has been a series of meetings to complete agreement on the baseline architecture. An overview of the architecture indicating some of the main parameters is shown in figure 1. As reported at the ATLAS Plenary during the February ATLAS week, the main area where the baseline had not yet been agreed was around the Read-Out System (ROS) and details in the DataFlow. The agreed architecture has: Read-Out Links (ROLs) from the RODs using S-Link; Read-Out Buffers (ROB) sited near the RODs, mounted in a chassis - today assumed to be a PC, using PCI bus at least for configuration, control and monitoring. The baseline assumes data aggregation, in the ROB and/or at the output (which could either be over a bus or in the network). Optimization of the data aggregation will be made in the coming months, but the current model has each ROB card receiving input from 4 ROLs, and 3 such c...

  13. SRP Baseline Hydrogeologic Investigation, Phase 3

    Energy Technology Data Exchange (ETDEWEB)

    Bledsoe, H.W.

    1988-08-01

    The SRP Baseline Hydrogeologic Investigation was implemented for the purpose of updating and improving the knowledge and understanding of the hydrogeologic systems underlying the SRP site. Phase III, which is discussed in this report, includes the drilling of 7 deep coreholes (sites P-24 through P-30) and the installation of 53 observation wells ranging in depth from approximately 50 ft to more than 970 ft below the ground surface. In addition to the collection of geologic cores for lithologic and stratigraphic study, samples were also collected for the determination of physical characteristics of the sediments and for the identification of microorganisms.

  14. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  15. Leadership for Sustainable Installations

    Science.gov (United States)

    2011-04-01

    way into the lexicon of the Army and installation management ( Warnock , 2009). Accordingly, the Undersecretary of the Army is the Senior...business approach, the Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated...needed, and completing and reviewing the collection of information . Send comments regarding this burden estimate or any other aspect of this collection

  16. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  17. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  18. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  19. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  20. Mineral mining installation

    Energy Technology Data Exchange (ETDEWEB)

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  1. Long Baseline Neutrino Experiments

    Science.gov (United States)

    Mezzetto, Mauro

    2016-05-01

    Following the discovery of neutrino oscillations by the Super-Kamiokande collaboration, recently awarded with the Nobel Prize, two generations of long baseline experiments had been setup to further study neutrino oscillations. The first generation experiments, K2K in Japan, Minos in the States and Opera in Europe, focused in confirming the Super-Kamiokande result, improving the precision with which oscillation parameters had been measured and demonstrating the ντ appearance process. Second generation experiments, T2K in Japan and very recently NOνA in the States, went further, being optimized to look for genuine three neutrino phenomena like non-zero values of θ13 and first glimpses to leptonic CP violation (LCPV) and neutrino mass ordering (NMO). The discovery of leptonic CP violation will require third generation setups, at the moment two strong proposals are ongoing, Dune in the States and Hyper-Kamiokande in Japan. This review will focus a little more in these future initiatives.

  2. Biofuels Baseline 2008

    Energy Technology Data Exchange (ETDEWEB)

    Hamelinck, C.; Koper, M.; Berndes, G.; Englund, O.; Diaz-Chavez, R.; Kunen, E.; Walden, D.

    2011-10-15

    The European Union is promoting the use of biofuels and other renewable energy in transport. In April 2009, the Renewable Energy Directive (2009/28/EC) was adopted that set a 10% target for renewable energy in transport in 2020. The directive sets several requirements to the sustainability of biofuels marketed in the frame of the Directive. The Commission is required to report to the European Parliament on a regular basis on a range of sustainability impacts resulting from the use of biofuels in the EU. This report serves as a baseline of information for regular monitoring on the impacts of the Directive. Chapter 2 discusses the EU biofuels market, the production and consumption of biofuels and international trade. It is derived where the feedstock for EU consumed biofuels originally come from. Chapter 3 discusses the biofuel policy framework in the EU and major third countries of supply. It looks at various policy aspects that are relevant to comply with the EU sustainability requirements. Chapter 4 discusses the environmental and social sustainability aspects associated with EU biofuels and their feedstock. Chapter 5 discusses the macro-economic effects that indirectly result from increased EU biofuels consumption, on commodity prices and land use. Chapter 6 presents country factsheets for main third countries that supplied biofuels to the EU market in 2008.

  3. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  4. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  5. Questa Baseline and Pre-Mining Ground-Water Quality Investigation 15.-Methods of Phase II and III Well Installation and Development and Results of Well Logging, Hydraulic Testing, and Water-Level Measurements in the Red River Valley, New Mexico, 2002-04

    Science.gov (United States)

    Blanchard, Paul J.; Bartolino, James R.; Donohoe, Lisa C.; McAda, Douglas P.; Naus, Cheryl A.; Morin, Roger H.

    2007-01-01

    In April 2001, the U.S. Geological Survey and the New Mexico Environment Department began a cooperative study to infer the pre-mining ground-water chemistry at the Molycorp molybdenum mine site in the Red River Valley of north- central New Mexico. This report is one in a series of reports that can be used to determine pre-mining ground-water conditions at the mine site. Weathering of hydrothermally altered bedrock in the study area has resulted in steep, highly erosive, and sparsely vegetated scar areas that are clearly visible from the ground and in aerial photographs. Runoff from intense summer rainfall over tributary drainages containing scar areas can transport large quantities of sediment and form debris fans where these tributaries join the Red River. Twenty-nine observation wells were installed in three phases as part of this study in the Red River Valley and tributary drainages. Eight Phase II observation wells were drilled using an air-rotary/hammer rig. Three Phase II and 10 phase III small-diameter wells were installed using a direct-push rig. Lithologic logs were recorded for all eight Phase II drilled wells. Borehole geophysical logging (including natural gamma, induction, and single-detector neutron) was conducted in three Phase II wells. Aquifer tests conducted during 2003 to estimate the hydraulic properties of debris-flow and Red River alluvial deposits in and near Straight Creek included a flow-meter survey, slug tests, and a pumping test. Results of a flow-meter survey in well SC-7A indicated that about 77 percent of the water entered the well from a 10-foot-thick zone near the top of the screened interval and about 23 percent of the water entered the well from a 15-foot-thick zone near the bottom of the screened interval. Slug tests, performed in 11 wells during June 3-5, 2003, indicated that the mean and median estimated hydraulic conductivities for debris-flow deposits were 15.25 and 15.35 feet per day, respectively, for bedrock were 0.12 and

  6. Mineral mining installation

    Energy Technology Data Exchange (ETDEWEB)

    Becker, K.; Rosenberg, H.; Weirich, W.

    1981-12-29

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (Either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a spring-loaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  7. Mineral mining installation

    Energy Technology Data Exchange (ETDEWEB)

    Weirich, W.

    1984-01-24

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a springloaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  8. ROS Installation and Commissioning

    CERN Multimedia

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  9. Hanford Site technical baseline database

    Energy Technology Data Exchange (ETDEWEB)

    Porter, P.E.

    1996-09-30

    This document includes a cassette tape that contains the Hanford specific files that make up the Hanford Site Technical Baseline Database as of September 30, 1996. The cassette tape also includes the delta files that dellinate the differences between this revision and revision 4 (May 10, 1996) of the Hanford Site Technical Baseline Database.

  10. Hanford Site technical baseline database

    Energy Technology Data Exchange (ETDEWEB)

    Porter, P.E., Westinghouse Hanford

    1996-05-10

    This document includes a cassette tape that contains the Hanford specific files that make up the Hanford Site Technical Baseline Database as of May 10, 1996. The cassette tape also includes the delta files that delineate the differences between this revision and revision 3 (April 10, 1996) of the Hanford Site Technical Baseline Database.

  11. Way to increase the user access at the LCLS baseline

    CERN Document Server

    Geloni, Gianluca; Saldin, Evgeni

    2010-01-01

    The LCLS beam is meant for a single user, but the baseline undulator is long enough to serve two users simultaneously. To this end, we propose a setup composed of two elements: an X-ray mirrors pair for X-ray beam deflection, and a 4 m-long magnetic chicane, which creates an offset for mirrors pair installation in the middle of the baseline undulator. The insertable mirrors pair can separate spatially the X-ray beams generated in the first and in the second half of the baseline undulator. Rapid switching of the FEL amplification process allows deactivating one half and activating another half of the undulator. As proposed elsewhere, using a kicker installed upstream of the LCLS baseline undulator and an already existing corrector in the first half of the undulator, it is possible to rapidly switch the X-ray beam from one user to another. We present simulation results for the LCLS baseline, and show that it is possible to generate two saturated SASE X-ray beams in the whole 0.8-8 keV photon energy range in the...

  12. Plutonium Immobilization Project Baseline Formulation

    Energy Technology Data Exchange (ETDEWEB)

    Ebbinghaus, B.

    1999-02-01

    A key milestone for the Immobilization Project (AOP Milestone 3.2a) in Fiscal Year 1998 (FY98) is the definition of the baseline composition or formulation for the plutonium ceramic form. The baseline formulation for the plutonium ceramic product must be finalized before the repository- and plant-related process specifications can be determined. The baseline formulation that is currently specified is given in Table 1.1. In addition to the baseline formulation specification, this report provides specifications for two alternative formulations, related compositional specifications (e.g., precursor compositions and mixing recipes), and other preliminary form and process specifications that are linked to the baseline formulation. The preliminary specifications, when finalized, are not expected to vary tremendously from the preliminary values given.

  13. Oscillation Baselining and Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-27

    PNNL developed a new tool for oscillation analysis and baselining. This tool has been developed under a new DOE Grid Modernization Laboratory Consortium (GMLC) Project (GM0072 - “Suite of open-source applications and models for advanced synchrophasor analysis”) and it is based on the open platform for PMU analysis. The Oscillation Baselining and Analysis Tool (OBAT) performs the oscillation analysis and identifies modes of oscillations (frequency, damping, energy, and shape). The tool also does oscillation event baselining (fining correlation between oscillations characteristics and system operating conditions).

  14. Quivira NWR biological baseline data

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This dataset is biological baseline data for Quivira National Wildlife Refuge as of January 2016. It contains data on species found on the refuge, when and where...

  15. 324 Building Baseline Radiological Characterization

    Energy Technology Data Exchange (ETDEWEB)

    R.J. Reeder, J.C. Cooper

    2010-06-24

    This report documents the analysis of radiological data collected as part of the characterization study performed in 1998. The study was performed to create a baseline of the radiological conditions in the 324 Building.

  16. The LBNO long-baseline oscillation sensitivities with two conventional neutrino beams at different baselines

    CERN Document Server

    Agarwalla, S.K.; Aittola, M.; Alekou, A.; Andrieu, B.; Antoniou, F.; Asfandiyarov, R.; Autiero, D.; Besida, O.; Balik, A.; Ballett, P.; Bandac, I.; Banerjee, D.; Bartmann, W.; Bay, F.; Biskup, B.; Blebea-Apostu, A.M.; Blondel, A.; Bogomilov, M.; Bolognesi, S.; Borriello, E.; Brancus, I.; Bravar, A.; Buizza-Avanzini, M.; Caiulo, D.; Calin, M.; Calviani, M.; Campanelli, M.; Cantini, C.; Cata-Danil, G.; Chakraborty, S.; Charitonidis, N.; Chaussard, L.; Chesneanu, D.; Chipesiu, F.; Crivelli, P.; Dawson, J.; De Bonis, I.; Declais, Y.; del Amo Sanchez, P.; Delbart, A.; Di Luise, S.; Duchesneau, D.; Dumarchez, J.; Efthymiopoulos, I.; Eliseev, A.; Emery, S.; Enqvist, T.; Enqvist, K.; Epprecht, L.; Erykalov, A.N.; Esanu, T.; Franco, D.; Friend, M.; Galymov, V.; Gavrilov, G.; Gendotti, A.; Giganti, C.; Gilardoni, S.; Goddard, B.; Gomoiu, C.M.; Gornushkin, Y.A.; Gorodetzky, P.; Haesler, A.; Hasegawa, T.; Horikawa, S.; Huitu, K.; Izmaylov, A.; Jipa, A.; Kainulainen, K.; Karadzhov, Y.; Khabibullin, M.; Khotjantsev, A.; Kopylov, A.N.; Korzenev, A.; Kosyanenko, S.; Kryn, D.; Kudenko, Y.; Kuusiniemi, P.; Lazanu, I.; Lazaridis, C.; Levy, J.M.; Loo, K.; Maalampi, J.; Margineanu, R.M.; Marteau, J.; Martin-Mari, C.; Matveev, V.; Mazzucato, E.; Mefodiev, A.; Mineev, O.; Mirizzi, A.; Mitrica, B.; Murphy, S.; Nakadaira, T.; Narita, S.; Nesterenko, D.A.; Nguyen, K.; Nikolics, K.; Noah, E.; Novikov, Yu.; Oprima, A.; Osborne, J.; Ovsyannikova, T.; Papaphilippou, Y.; Pascoli, S.; Patzak, T.; Pectu, M.; Pennacchio, E.; Periale, L.; Pessard, H.; Popov, B.; Ravonel, M.; Rayner, M.; Resnati, F.; Ristea, O.; Robert, A.; Rubbia, A.; Rummukainen, K.; Saftoiu, A.; Sakashita, K.; Sanchez-Galan, F.; Sarkamo, J.; Saviano, N.; Scantamburlo, E.; Sergiampietri, F.; Sgalaberna, D.; Shaposhnikova, E.; Slupecki, M.; Smargianaki, D.; Stanca, D.; Steerenberg, R.; Sterian, A.R.; Sterian, P.; Stoica, S.; Strabel, C.; Suhonen, J.; Suvorov, V.; Toma, G.; Tonazzo, A.; Trzaska, W.H.; Tsenov, R.; Tuominen, K.; Valram, M.; Vankova-Kirilova, G.; Vannucci, F.; Vasseur, G.; Velotti, F.; Velten, P.; Venturi, V.; Viant, T.; Vihonen, S.; Vincke, H.; Vorobyev, A.; Weber, A.; Wu, S.; Yershov, N.; Zambelli, L.; Zito, M.

    2014-01-01

    The proposed Long Baseline Neutrino Observatory (LBNO) initially consists of $\\sim 20$ kton liquid double phase TPC complemented by a magnetised iron calorimeter, to be installed at the Pyh\\"asalmi mine, at a distance of 2300 km from CERN. The conventional neutrino beam is produced by 400 GeV protons accelerated at the SPS accelerator delivering 700 kW of power. The long baseline provides a unique opportunity to study neutrino flavour oscillations over their 1st and 2nd oscillation maxima exploring the $L/E$ behaviour, and distinguishing effects arising from $\\delta_{CP}$ and matter. In this paper we show how this comprehensive physics case can be further enhanced and complemented if a neutrino beam produced at the Protvino IHEP accelerator complex, at a distance of 1160 km, and with modest power of 450 kW is aimed towards the same far detectors. We show that the coupling of two independent sub-MW conventional neutrino and antineutrino beams at different baselines from CERN and Protvino will allow to measure ...

  17. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  18. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  19. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  20. Countering Terrorism on Military Installations

    Science.gov (United States)

    1977-07-29

    enforcement purposes. Installation Provost Marshal should review the installation Tables of Distribucion and Allowances to determine commercial items of law...terrorist acts occurring within the 50 U.S. states, territor- ies, and possessions (including the Panama Canal Zone) rests with the Federal Bureadu...nence of the threat is difficult to predict. Today I estimate the threat as relatively low. S- In the Panama Canal Zone there could be three threats. One

  1. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  2. The Status of LIGO Installation and Commissioning

    Science.gov (United States)

    Raab, Frederick J.

    2002-12-01

    LIGO is engaged in installation and commissioning in Hanford and Livingston. We are commissioning the first instance of any subsystem installed, applying lessons learned to later installations. We have installed all seismic stacks, installed lasers and input optics at both observatories and we have operated both of the 2-km Fabry-Perot cavities at Hanford, with lock times up to 10 hrs.

  3. Learning to Baseline Business Technology

    Directory of Open Access Journals (Sweden)

    David Gore

    2013-10-01

    Full Text Available bills, sign multi-­‐year contracts, and make purchasing decisions without having an overall technology plan. That plan includes a technology baseline to fully assess existing technology. A CIO's goal is to align IT with business goals. Businesses must know total cost of ownership and the return on investment for all technology purchases and monthly costs. A business must also be able to manage technology assets and best utilize resources across the business. Teaching students to baseline technology will enable them to track and manage costs, discover errors and waste, and consolidate and improve existing technology.

  4. The ATALANTE installation; L'installation atalante

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-10-01

    In the Atalante installation of the CEA/Marcoule, researches on the reprocessing of irradiated fuel from nuclear reactors, are performed. In the framework of the law (30 december 1991) on the public policy concerning the radioactive wastes management, the ATALANTE project has to proposed solutions for the long-dated management of these wastes and to help the reprocessing industry. The specifications of the installation and the research programs are detailed with a special interest for the glass durability and the plutonium purifying cycle. The public policy stakes are also recalled. (A.L.B.)

  5. Baseline Removal From EMG Recordings

    Science.gov (United States)

    2007-11-02

    a time-varying baseline contamination. Acknowledgements: Work funded by the Departamento de Salud del Gobierno de Navarrra and by a Spanish MEC...Name(s) and Address(es) Departamento de Ingenieria Electra y Electronica Universidad Publica de Navarra Pamplona, Spain Performing Organization Report

  6. YB0 SERVICES INSTALLATION COMPLETED

    CERN Multimedia

    The beauty of the completed YB0 was briefly visible at P5 as preparations continue for Tracker installation. A tremendous effort, lasting 7 months and involving more than 100 workers on the busiest days, resulted in 5700 electrical cables, 780 optical cables with 65k fibre channels, and 550 pipes laid on YB0 for HB, EB and Tracker.

  7. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  8. Temperature rise of installed FCC

    Science.gov (United States)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  9. Mode S Baseline Radar Tracking.

    Science.gov (United States)

    1982-11-01

    range units and 20 azimuth units) overlaying the position of the beacon reports. In the cases analyzed where beacon reports were not radar reinforced ...82/53 j~ C ~ 7 C _ _ _ _ _ _ 4. Title end Su.btitle 5. Neget at. November 1982 MDDE S BASELINE RADAR TRACKIN4G 6. Poelin Orgeuianti.. Cede ACT-100...Ground Clutter 33 Mode S/ARTS III 100-Scan False Radar Track Summary 74 34 Percent Beacon Radar Reinforcement 77 vii INTRODUCTION PURPOSE. The purpose of

  10. Long-Baseline Neutrino Experiments

    CERN Document Server

    Diwan, M V; Qian, X; Rubbia, A

    2016-01-01

    We review long-baseline neutrino experiments in which neutrinos are detected after traversing macroscopic distances. Over such distances neutrinos have been found to oscillate among flavor states. Experiments with solar, atmospheric, reactor, and accelerator neutrinos have resulted in a coherent picture of neutrino masses and mixing of the three known flavor states. We will summarize the current best knowledge of neutrino parameters and phenomenology with our focus on the evolution of the experimental technique. We proceed from the first evidence produced by astrophysical neutrino sources to the current open questions and the goals of future research.

  11. Long-Baseline Neutrino Experiments

    Science.gov (United States)

    Diwan, M. V.; Galymov, V.; Qian, X.; Rubbia, A.

    2016-10-01

    We review long-baseline neutrino experiments in which neutrinos are detected after traversing macroscopic distances. Over such distances neutrinos have been found to oscillate among flavor states. Experiments with solar, atmospheric, reactor, and accelerator neutrinos have resulted in a coherent picture of neutrino masses and mixing of the three known flavor states. We summarize the current best knowledge of neutrino parameters and phenomenology, with a focus on the evolution of the experimental technique. We proceed from the first evidence produced by astrophysical neutrino sources to the current open questions and the goals of future research.

  12. Baseline LAW Glass Formulation Testing

    Energy Technology Data Exchange (ETDEWEB)

    Kruger, Albert A. [USDOE Office of River Protection, Richland, WA (United States); Mooers, Cavin [The Catholic University of America, Washington, DC (United States). Vitreous State Lab.; Bazemore, Gina [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Pegg, Ian L. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Hight, Kenneth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Lai, Shan Tao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Buechele, Andrew [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Rielley, Elizabeth [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Gan, Hao [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Muller, Isabelle S. [The Catholic University of America, Washington, DC (United States). Vitreous State Lab; Cecil, Richard [The Catholic University of America, Washington, DC (United States). Vitreous State Lab

    2013-06-13

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  13. Reliability of Arctic offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Bercha, F.G. [Bercha Group, Calgary, AB (Canada); Gudmestad, O.T. [Stavanger Univ., Stavanger (Norway)]|[Statoil, Stavanger (Norway)]|[Norwegian Univ. of Technology, Stavanger (Norway); Foschi, R. [British Columbia Univ., Vancouver, BC (Canada). Dept. of Civil Engineering; Sliggers, F. [Shell International Exploration and Production, Rijswijk (Netherlands); Nikitina, N. [VNIIG, St. Petersburg (Russian Federation); Nevel, D.

    2006-11-15

    Life threatening and fatal failures of offshore structures can be attributed to a broad range of causes such as fires and explosions, buoyancy losses, and structural overloads. This paper addressed the different severities of failure types, categorized as catastrophic failure, local failure or serviceability failure. Offshore tragedies were also highlighted, namely the failures of P-36, the Ocean Ranger, the Piper Alpha, and the Alexander Kieland which all resulted in losses of human life. P-36 and the Ocean Ranger both failed ultimately due to a loss of buoyancy. The Piper Alpha was destroyed by a natural gas fire, while the Alexander Kieland failed due to fatigue induced structural failure. The mode of failure was described as being the specific way in which a failure occurs from a given cause. Current reliability measures in the context of offshore installations only consider the limited number of causes such as environmental loads. However, it was emphasized that a realistic value of the catastrophic failure probability should consider all credible causes of failure. This paper presented a general method for evaluating all credible causes of failure of an installation. The approach to calculating integrated reliability involves the use of network methods such as fault trees to combine the probabilities of all factors that can cause a catastrophic failure, as well as those which can cause a local failure with the potential to escalate to a catastrophic failure. This paper also proposed a protocol for setting credible reliability targets such as the consideration of life safety targets and escape, evacuation, and rescue (EER) success probabilities. A set of realistic reliability targets for both catastrophic and local failures for representative safety and consequence categories associated with offshore installations was also presented. The reliability targets were expressed as maximum average annual failure probabilities. The method for converting these annual

  14. IEA Wind Task 26: Offshore Wind Farm Baseline Documentation

    Energy Technology Data Exchange (ETDEWEB)

    Smart, Gavin [Offshore Renewable Energy Catapult, Blyth, Northumberland (United Kingdom); Smith, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Warner, Ethan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sperstad, Iver Bakken [SINTEF Energy Research, Trondheim (Norway); Prinsen, Bob [Ecofys, Utrecht (Netherlands). TKI Wind Op Zee; Lacal-Arantegui, Roberto [European Commission Joint Research Centre (JRC), Brussels (Belgium)

    2016-06-02

    This document has been produced to provide the definition and rationale for the Baseline Offshore Wind Farm established within IEA Wind Task 26--Cost of Wind Energy. The Baseline has been developed to provide a common starting point for country comparisons and sensitivity analysis on key offshore wind cost and value drivers. The baseline project reflects an approximate average of the characteristics of projects installed between 2012 and 2014, with the project life assumed to be 20 years. The baseline wind farm is located 40 kilometres (km) from construction and operations and maintenance (O&M) ports and from export cable landfall. The wind farm consists of 100 4-megawatt (MW) wind turbines mounted on monopile foundations in an average water depth of 25 metres (m), connected by 33-kilovolt (kV) inter-array cables. The arrays are connected to a single offshore substation (33kV/220kV) mounted on a jacket foundation, with the substation connected via a single 220kV export cable to an onshore substation, 10km from landfall. The wind farm employs a port-based O&M strategy using crew-transfer vessels.

  15. Baseline Gas Turbine Development Program. Eleventh quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F.W.; Wagner, C.E.

    1975-07-31

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. NASA completed initial heat balance testing of a baseline engine. An additional 450 hours were run on ceramic regenerators and seals. Seal wear rates are very good, and the elastomeric mounting system was satisfactory. An engine/control oil supply system based on the power steering pump is successfully operating in baseline vehicles. The design of the upgraded engine power turbine nozzle actuator was finalized, and layouts of the inlet guide vane actuator are in process. A lock-up torque converter was installed in the free rotor vehicle. Baseline engine and vehicle testing of water injection and variable inlet guide vanes was completed. A thermal analysis of the gas generator is in process. A steady-state, full power analysis was made. A three-dimensional stress analysis of the compressor cover was made. The power turbine nozzle actuating system layout was completed. The analytical studies of the power turbine rotor bearings were completed. MTI completed the design of the gas generator rotor simulation fixture and is starting to build it. Optimized reduction gears were successfully tested in a baseline engine.

  16. Pinellas Plant Environmental Baseline Report

    Energy Technology Data Exchange (ETDEWEB)

    1997-06-01

    The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current and past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.

  17. TWRS privatization process technical baseline

    Energy Technology Data Exchange (ETDEWEB)

    Orme, R.M.

    1996-09-13

    The U.S. Department of Energy (DOE) is planning a two-phased program for the remediation of Hanford tank waste. Phase 1 is a pilot program to demonstrate the procurement of treatment services. The volume of waste treated during the Phase 1 is a small percentage of the tank waste. During Phase 2, DOE intends to procure treatment services for the balance of the waste. The TWRS Privatization Process Technical Baseline (PPTB) provides a summary level flowsheet/mass balance of tank waste treatment operations which is consistent with the tank inventory information, waste feed staging studies, and privatization guidelines currently available. The PPTB will be revised periodically as privatized processing concepts are crystallized.

  18. Integrated Baseline Review (IBR) Handbook

    Science.gov (United States)

    Fleming, Jon F.; Kehrer, Kristen C.

    2016-01-01

    The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

  19. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-30

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  20. Installation package for a solar heating system

    Science.gov (United States)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  1. Multifunctional Heat Pump Installation for Dairy Plants

    Directory of Open Access Journals (Sweden)

    Sit M.L.

    2015-08-01

    Full Text Available The article presents the installation based on the approach using the integration of the carbon dioxide heat pump in pasteurization and cooling installation for milk and in installations for preparing of hot and "icy" water. The scheme differs from the prototype by the use of additional heat exchangers and of their connection to the main elements of the installation. A proposed technique of elements connection in the heat pump installation permits to compensate the effect of temperature of cold water supply source, which is low-grade heat source for the heat pump, on the quality the work of the installation. The design of the installation enables to compensate the impact of seasonal variation of water temperature. The installation ensures the COP = 5.3.

  2. Helium transfer line installation details.

    CERN Multimedia

    G. Perinic

    2007-01-01

    A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with the hole in the rail support as well as the connection points at both ends required precise measurements of the given geometries as well as the installation of a temporary target for the verification of the theoretical predictions.

  3. Automated solar collector installation design

    Energy Technology Data Exchange (ETDEWEB)

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  4. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a small-scal

  5. Dynamics of flatter wind pump installation

    Directory of Open Access Journals (Sweden)

    А. С. Крижановський

    1999-05-01

    Full Text Available Wind pump installation is considered, in which as quality wind engine is used flatter wind engine with vertically located wing blade. For research of dynamics of installation its mathematical model is constructed. Determined is the law of movement of wing blade at a connected load and main characteristics of wind pump installation

  6. VIRUS early installation and commissioning

    Science.gov (United States)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  7. 2016 Annual Technology Baseline (ATB)

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Wesley; Kurup, Parthiv; Hand, Maureen; Feldman, David; Sigrin, Benjamin; Lantz, Eric; Stehly, Tyler; Augustine, Chad; Turchi, Craig; O' Connor, Patrick; Waldoch, Connor

    2016-09-01

    Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), National Renewable Energy Laboratory provides an organized and centralized dataset that was reviewed by internal and external experts. It uses the best information from the Department of Energy laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information. The ATB includes both a presentation with notes (PDF) and an associated Excel Workbook. The ATB includes the following electricity generation technologies: land-based wind; offshore wind; utility-scale solar PV; concentrating solar power; geothermal power; hydropower plants (upgrades to existing facilities, powering non-powered dams, and new stream-reach development); conventional coal; coal with carbon capture and sequestration; integrated gasification combined cycle coal; natural gas combustion turbines; natural gas combined cycle; conventional biopower. Nuclear laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information.

  8. Assembly and Installation of the Daya Bay Antineutrino Detectors

    CERN Document Server

    Band, H R; Carr, R; Chen, X C; Chen, X H; Cherwinka, J J; Chu, M C; Draeger, E; Dwyer, D A; Edwards, W R; Gill, R; Goett, J; Greenler, L S; Gu, W Q; He, W S; Heeger, K M; Heng, Y K; Hinrichs, P; Ho, T H; Hoff, M; Hsiung, Y B; Jin, Y; Kang, L; Kettell, S H; Kramer, M; Kwan, K K; Kwok, M W; Lewis, C A; Li, G S; Li, N; Li, S F; Li, X N; Lin, C J; Littlejohn, B R; Liu, J L; Luk, K B; Luo, X L; Ma, X Y; McFarlane, M C; McKeown, R D; Nakajima, Y; Ochoa-Ricoux, J P; Pagac, A; Qian, X; Seilhan, B; Shih, K; Steiner, H; Tang, X; Themann, H; Tsang, K V; Tsang, R H M; Virostek, S; Wang, L; Wang, W; Wang, Z M; Webber, D M; Wei, Y D; Wen, L J; Wenman, D L; Wilhelmi, J; Wingert, M; Wise, T; Wong, H L H; Wu, F F; Xiao, Q; Yang, L; Zhang, Z J; Zhong, W L; Zhuang, H L

    2013-01-01

    The Daya Bay reactor antineutrino experiment is designed to make a precision measurement of the neutrino mixing angle theta13, and recently made the definitive discovery of its nonzero value. It utilizes a set of eight, functionally identical antineutrino detectors to measure the reactor flux and spectrum at baselines of 300 - 2000m from the Daya Bay and Ling Ao Nuclear Power Plants. The Daya Bay antineutrino detectors were built in an above-ground facility and deployed side-by-side at three underground experimental sites near and far from the nuclear reactors. This configuration allows the experiment to make a precision measurement of reactor antineutrino disappearance over km-long baselines and reduces relative systematic uncertainties between detectors and nuclear reactors. This paper describes the assembly and installation of the Daya Bay antineutrino detectors.

  9. 2016 Annual Technology Baseline (ATB) - Webinar Presentation

    Energy Technology Data Exchange (ETDEWEB)

    Cole, Wesley; Kurup, Parthiv; Hand, Maureen; Feldman, David; Sigrin, Benjamin; Lantz, Eric; Stehly, Tyler; Augustine, Chad; Turchi, Craig; Porro, Gian; O' Connor, Patrick; Waldoch, Connor

    2016-09-13

    This deck was presented for the 2016 Annual Technology Baseline Webinar. The presentation describes the Annual Technology Baseline, which is a compilation of current and future cost and performance data for electricity generation technologies.

  10. Atlantic NAD 83 SLA Baseline Points

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains baseline points in ArcGIS shapefile format for the BOEM Atlantic Region. Baseline points are the discrete coordinate points along the...

  11. Atlantic NAD 83 SLA Baseline Points

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains baseline points in ArcGIS shapefile format for the BOEM Atlantic Region. Baseline points are the discrete coordinate points along the...

  12. Atlantic NAD 83 SLA Baseline Tangents

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains baseline tangent lines in ArcGIS shapefile format for the BOEM Atlantic Region. Baseline tangent lines are typically bay or river closing...

  13. 40 CFR 1042.825 - Baseline determination.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Baseline determination. 1042.825... Provisions for Remanufactured Marine Engines § 1042.825 Baseline determination. (a) For the purpose of this... not valid. (f) Use good engineering judgment for all aspects of the baseline determination. We may...

  14. Comparative environmental assessment of unconventional power installations

    Science.gov (United States)

    Sosnina, E. N.; Masleeva, O. V.; Kryukov, E. V.

    2015-08-01

    Procedure of the strategic environmental assessment of the power installations operating on the basis of renewable energy sources (RES) was developed and described. This procedure takes into account not only the operational process of the power installation but also the whole life cycles: from the production and distribution of power resources for manufacturing of the power installations to the process of their recovery. Such an approach gives an opportunity to make a more comprehensive assessment of the influence of the power installations on environments and may be used during adaptation of the current regulations and development of new regulations for application of different types of unconventional power installations with due account of the ecological factor. Application of the procedure of the integrated environmental assessment in the context of mini-HPP (Hydro Power Plant); wind, solar, and biogas power installations; and traditional power installation operating natural gas was considered. Comparison of environmental influence revealed advantages of new energy technologies compared to traditional ones. It is shown that solar energy installations hardly pollute the environment during operation, but the negative influence of the mining operations and manufacturing and utilization of the materials used for solar modules is maximum. Biogas power installations are on the second place as concerns the impact on the environment due to the considerable mass of the biogas installation and gas reciprocating engine. The minimum impact on the environment is exerted by the mini-HPP. Consumption of material and energy resources for the production of the traditional power installation is less compared to power installations on RES; however, this factor incomparably increases when taking into account the fuel extraction and transfer. The greatest impact on the environment is exerted by the operational process of the traditional power installations.

  15. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...... the suction assisted installation process. In this thesis, the phenomenon of buckling of the bucket foundation during installation is investigated by means of Finite Element Analysis. The influence of boundary conditions on the bucket foundation is adressed as well as the effect of including the surrounding...

  16. Installation of Shimming Bars for CYCIAE-100

    Institute of Scientific and Technical Information of China (English)

    LV; Yin-long; WANG; Zhen-hui; ZHONG; Jun-qing; LIU; Geng-shou

    2012-01-01

    <正>The 100 MeV high intensity proton cyclotron, CYCIAE-100, is the most critical equipment of the BRIF project at CIAE. The shimming bars are used to get the isochronous magnetic field. In the process of magnetic mapping and shimming, the bars should be repeated the installed and disassembly for about 10 times. Each time the installation precision must be ensured. The bars installation schedule and quality are directly related to the BRIF project progress.

  17. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  18. ID Barrel installed in cryostat

    CERN Multimedia

    Apsimon, R.; Romaniouk, A.

    Wednesday 23rd August was a memorable day for the Inner Detector community as they witnessed the transport and installation of the central part of the inner detector (ID-barrel) into the ATLAS detector. Many members of the collaboration gathered to witness this moment at Point 1. After years of design, construction and commissioning, the outer two detectors (TRT and SCT) of the ID barrel were moved from the SR1 cleanroom to the ATLAS cavern. The barrel was moved across the car park from building 2175 to SX1. Although only a journey of about 100 metres, this required weeks of planning and some degree of luck as far as the weather was concerned. Accelerometers were fitted to the barrel to provide real-time monitoring and no values greater than 0.1 g were recorded, fully satisfying the transport specification for this extremely precise and fragile detector. Muriel, despite her fear of heights, bravely volunteered to keep a close eye on the detector. Swapping cranes to cross the entire parking lot, while Mur...

  19. Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Sharon M [ORNL; Jubin, Robert Thomas [ORNL; Patton, Bradley D [ORNL; Sullivan, Nicholas M [ORNL; Bugbee, Kathy P [ORNL

    2009-09-01

    sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

  20. Electricity End Uses, Energy Efficiency, and Distributed Energy Resources Baseline

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wei, Max [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Morrow, William [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Deason, Jeff [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Schiller, Steven R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Leventis, Greg [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Smith, Sarah [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Leow, Woei Ling [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Levin, Todd [Argonne National Lab. (ANL), Argonne, IL (United States); Plotkin, Steven [Argonne National Lab. (ANL), Argonne, IL (United States); Zhou, Yan [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2017-01-01

    This report was developed by a team of analysts at Lawrence Berkeley National Laboratory, with Argonne National Laboratory contributing the transportation section, and is a DOE EPSA product and part of a series of “baseline” reports intended to inform the second installment of the Quadrennial Energy Review (QER 1.2). QER 1.2 provides a comprehensive review of the nation’s electricity system and cover the current state and key trends related to the electricity system, including generation, transmission, distribution, grid operations and planning, and end use. The baseline reports provide an overview of elements of the electricity system. This report focuses on end uses, electricity consumption, electric energy efficiency, distributed energy resources (DERs) (such as demand response, distributed generation, and distributed storage), and evaluation, measurement, and verification (EM&V) methods for energy efficiency and DERs.

  1. Post Auction Coverage Baseline 2.0

    Data.gov (United States)

    Federal Communications Commission — FINAL TELEVISION CHANNEL ASSIGNMENT INFORMATION RELATED TO INCENTIVE AUCTION REPACKING. NOTE: This file provides new baseline coverage and population data for all...

  2. Automated baseline change detection -- Phases 1 and 2. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Byler, E.

    1997-10-31

    The primary objective of this project is to apply robotic and optical sensor technology to the operational inspection of mixed toxic and radioactive waste stored in barrels, using Automated Baseline Change Detection (ABCD), based on image subtraction. Absolute change detection is based on detecting any visible physical changes, regardless of cause, between a current inspection image of a barrel and an archived baseline image of the same barrel. Thus, in addition to rust, the ABCD system can also detect corrosion, leaks, dents, and bulges. The ABCD approach and method rely on precise camera positioning and repositioning relative to the barrel and on feature recognition in images. The ABCD image processing software was installed on a robotic vehicle developed under a related DOE/FETC contract DE-AC21-92MC29112 Intelligent Mobile Sensor System (IMSS) and integrated with the electronics and software. This vehicle was designed especially to navigate in DOE Waste Storage Facilities. Initial system testing was performed at Fernald in June 1996. After some further development and more extensive integration the prototype integrated system was installed and tested at the Radioactive Waste Management Facility (RWMC) at INEEL beginning in April 1997 through the present (November 1997). The integrated system, composed of ABCD imaging software and IMSS mobility base, is called MISS EVE (Mobile Intelligent Sensor System--Environmental Validation Expert). Evaluation of the integrated system in RWMC Building 628, containing approximately 10,000 drums, demonstrated an easy to use system with the ability to properly navigate through the facility, image all the defined drums, and process the results into a report delivered to the operator on a GUI interface and on hard copy. Further work is needed to make the brassboard system more operationally robust.

  3. The Analysis of Baselines for Different Fluxgate Theodolites of Geomagnetic Observatories

    Directory of Open Access Journals (Sweden)

    Xin Changjiang

    2011-07-01

    Full Text Available This paper analyzes the baselines of 8 geomagnetic observatories in the China Magnetic Observatory Network. The baselines of similar variometers were measured by two different fluxgate theodolites during the same time period. The results demonstrate that two baseline values measured by two independent absolute instruments did not completely coincide for the same components even though the differences between pillars and instruments had been corrected. The baseline values were still not smooth, and there existed obvious wave variations for the D, H, and Z components. The causes of this inconsistency might be the differences between the two pillars installed with two independent absolute instruments and instrument problems in some of the observatories. In other words, the difference in the geomagnetic field between two points in the same observational area is not a constant.

  4. TAPIR--Finnish national geochemical baseline database.

    Science.gov (United States)

    Jarva, Jaana; Tarvainen, Timo; Reinikainen, Jussi; Eklund, Mikael

    2010-09-15

    In Finland, a Government Decree on the Assessment of Soil Contamination and Remediation Needs has generated a need for reliable and readily accessible data on geochemical baseline concentrations in Finnish soils. According to the Decree, baseline concentrations, referring both to the natural geological background concentrations and the diffuse anthropogenic input of substances, shall be taken into account in the soil contamination assessment process. This baseline information is provided in a national geochemical baseline database, TAPIR, that is publicly available via the Internet. Geochemical provinces with elevated baseline concentrations were delineated to provide regional geochemical baseline values. The nationwide geochemical datasets were used to divide Finland into geochemical provinces. Several metals (Co, Cr, Cu, Ni, V, and Zn) showed anomalous concentrations in seven regions that were defined as metal provinces. Arsenic did not follow a similar distribution to any other elements, and four arsenic provinces were separately determined. Nationwide geochemical datasets were not available for some other important elements such as Cd and Pb. Although these elements are included in the TAPIR system, their distribution does not necessarily follow the ones pre-defined for metal and arsenic provinces. Regional geochemical baseline values, presented as upper limit of geochemical variation within the region, can be used as trigger values to assess potential soil contamination. Baseline values have also been used to determine upper and lower guideline values that must be taken into account as a tool in basic risk assessment. If regional geochemical baseline values are available, the national guideline values prescribed in the Decree based on ecological risks can be modified accordingly. The national geochemical baseline database provides scientifically sound, easily accessible and generally accepted information on the baseline values, and it can be used in various

  5. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  6. 46 CFR 111.33-5 - Installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  7. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  8. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER...

  9. A Hadron Radiation Installation and Verification Method

    NARCIS (Netherlands)

    Beekman, F.J.; Bom, V.R.

    2013-01-01

    A hadron radiation installation adapted to subject a target to irradiation by a hadron radiation beam, said installation comprising: - a target support configured to support, preferably immobilize, a target: - a hadron radiation apparatus adapted to emit a hadron radiation beam along a beam axis to

  10. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    What. This chapter focuses on software engineering principles with specific emphasis on interactive installations providing embodied, tangible, and immersive experiences for the user. Such installations may deliver light, image, sound, and movement through actuators and may provide interaction...... installations and support the description of the approach with a single case- a bumper car competition. Why. To some extent, standard techniques for software development can be adapted for interactive installations. However, there is a need to emphasize the unique aspects of installations, bringing tangible...... architecture as well as esthetic experience, artistic expression, and leisure aspects into focus. The approach presented here has this intended purpose. Where. Building on experience from conventional software development and with inspiration from interaction design and creative programming, this chapter...

  11. Arduino Tool: For Interactive Artwork Installations

    CERN Document Server

    Shaikh, Murtaza Hussain

    2012-01-01

    The emergence of the digital media and computational tools has widened the doors for creativity. The cutting edge in the digital arts and role of new technologies can be explored for the possible creativity. This gives an opportunity to involve arts with technologies to make creative works. The interactive artworks are often installed in the places where multiple people can interact with the installation, which allows the art to achieve its purpose by allowing the people to observe and involve with the installation. The level of engagement of the audience depends on the various factors such as aesthetic satisfaction, how the audience constructs meaning, pleasure and enjoyment. The method to evaluate these experiences is challenging as it depends on integration between the artificial life and real life by means of human computer interaction. This research investigates "How Adriano fits for creative and interactive artwork installations?" using an artwork installation in the campus of NTNU (Norwegian University...

  12. Photovoltaic installation connected to the electric network; Installation photovoltaique raccordee au reseau

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2004-07-15

    This technical sheet on the connection of a photovoltaic installation to the electric network, provides information on the operating of such an installation, the possibilities of installation on a building, the possible subsidies, types of connection, environmental impacts, the electric power production, the cost estimation, the maintenance and life time and the administrative procedures. (A.L.B.)

  13. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  14. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  15. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  16. Life Support Baseline Values and Assumptions Document

    Science.gov (United States)

    Anderson, Molly S.; Ewert, Michael K.; Keener, John F.; Wagner, Sandra A.

    2015-01-01

    The Baseline Values and Assumptions Document (BVAD) provides analysts, modelers, and other life support researchers with a common set of values and assumptions which can be used as a baseline in their studies. This baseline, in turn, provides a common point of origin from which many studies in the community may depart, making research results easier to compare and providing researchers with reasonable values to assume for areas outside their experience. With the ability to accurately compare different technologies' performance for the same function, managers will be able to make better decisions regarding technology development.

  17. Instability of Bucket Foundations during Installation

    DEFF Research Database (Denmark)

    Madsen, Søren; Andersen, Lars Vabbersgaard; Ibsen, Lars Bo

    The bucket foundation is an upcoming technology for offshore wind turbines. The bucket foundation is a large cylindrical monopod foundation constructed as a thin steel shell structure. A bucket foundation does not require heavy installation equipment since it is installed by suction forces....... The combination of a thin shell structure and suction forces leads to the fact that instability, in form of buckling, becomes a crucial issue during installation. The hydrostatic buckling pressure of the bucket foundation is addressed using three-dimensional, non-linear finite element analysis. The results...

  18. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects...

  19. Ultrasonic Techniques for Baseline-Free Damage Detection in Structures

    Science.gov (United States)

    Dutta, Debaditya

    This research presents ultrasonic techniques for baseline-free damage detection in structures in the context of structural health monitoring (SHM). Conventional SHM methods compare signals obtained from the pristine condition of a structure (baseline signals) with those from the current state, and relate certain changes in the signal characteristics to damage. While this approach has been successful in the laboratory, there are certain drawbacks of depending on baseline signals in real field applications. Data from the pristine condition are not available for most existing structures. Even if they are available, operational and environmental variations tend to mask the effect of damage on the signal characteristics. Most important, baseline measurements may become meaningless while assessing the condition of a structure after an extreme event such as an earthquake or a hurricane. Such events may destroy the sensors themselves and require installation of new sensors at different locations on the structure. Baseline-free structural damage detection can broaden the scope of SHM in the scenarios described above. A detailed discussion on the philosophy of baseline-free damage detection is provided in Chapter 1. Following this discussion, the research questions are formulated. The organization of this document and the major contributions of this research are also listed in this chapter. Chapter 2 describes a fully automated baseline-free technique for notch and crack detection in plates using a collocated pair of piezoelectric wafer transducers for measuring ultrasonic signals. Signal component corresponding to the damage induced mode-converted Lamb waves is extracted by processing the originally measured ultrasonic signals. The damage index is computed as a function of this mode-converted Lamb wave signal component. An over-determined system of Lamb wave measurements is used to find a least-square estimate of the measurement errors. This error estimate serves as the

  20. Breton Island, Louisiana Baseline (Geographic, NAD83)

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Breton Island, Louisiana Baseline (Geographic, NAD83) consists of vector line data that were input into the Digital Shoreline Analysis System (DSAS) version 4.0,...

  1. SSA FITARA Common Baseline Implementation Plan

    Data.gov (United States)

    Social Security Administration — This document describes the agency's plan to implement the Federal Information Technology Acquisition Reform Act (FITARA) Common Baseline per OMB memorandum M-15-14.

  2. NRAO Very Long Baseline Array (VLBA)

    Data.gov (United States)

    Federal Laboratory Consortium — The Very Long Baseline Array (VLBA) comprises ten radio telescopes spanning 5,351 miles. It's the world's largest, sharpest, dedicated telescope array. With an eye...

  3. Breton Island, Louisiana Baseline (Geographic, NAD83)

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Breton Island, Louisiana Baseline (Geographic, NAD83) consists of vector line data that were input into the Digital Shoreline Analysis System (DSAS) version 4.0,...

  4. Hanford Site technical baseline database. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Porter, P.E.

    1995-01-27

    This report lists the Hanford specific files (Table 1) that make up the Hanford Site Technical Baseline Database. Table 2 includes the delta files that delineate the differences between this revision and revision 0 of the Hanford Site Technical Baseline Database. This information is being managed and maintained on the Hanford RDD-100 System, which uses the capabilities of RDD-100, a systems engineering software system of Ascent Logic Corporation (ALC). This revision of the Hanford Site Technical Baseline Database uses RDD-100 version 3.0.2.2 (see Table 3). Directories reflect those controlled by the Hanford RDD-100 System Administrator. Table 4 provides information regarding the platform. A cassette tape containing the Hanford Site Technical Baseline Database is available.

  5. Structural Code Considerations for Solar Rooftop Installations.

    Energy Technology Data Exchange (ETDEWEB)

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  6. Prototype solar-heating system - installation manual

    Science.gov (United States)

    1978-01-01

    Manual for prototype solar-heating system gives detailed installation procedures for each of seven subsystems. Procedures for operation and maintenance are also included. It discusses architectural considerations, building construction considerations, and checkout-test procedures.

  7. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  8. Subsea flexible flowline installation issues and solutions

    Institute of Scientific and Technical Information of China (English)

    Kevin Huang

    2013-01-01

    Flexible flowlines and risers have been increasingly used for deepwater and ultra-deepwater field applications,partially because of its low submerged weight and better dynamic characteristics comparing to rigid pipelines.The offshore installation of flowline may have advantages as well.However,it has special needs for the installation aids,and it is challenging to install tie-in structures due to its low bending stiffness.This paper is to present some of the challenges during a recent flexible installation project with a total of more than 100 km flexible flowlines,and 24 in-line sleds/pipeline end termination(PLET) in water depth up to 1 300 m.

  9. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  10. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present a conce...... concerning urban computing, including media architecture.......Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects...

  11. RF accelerating unit installed in the PSB

    CERN Multimedia

    1972-01-01

    RF accelerating unit installed in the PSB ring between two bending magnets. Cool air from a heat exchanger is injected into the four cavities from the central feeder and the hot air recirculated via the lateral ducts.

  12. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  13. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  14. Software Management Environment (SME) installation guide

    Science.gov (United States)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  15. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  16. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  17. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  18. Enlisting Ecosystem Benefits: Quantification and Valuation of Ecosystem Services to Inform Installation Management

    Science.gov (United States)

    2015-05-27

    stewardship, sustaining multiple uses of lands (e.g., resource conservation, wildlife protection, recreation, and energy development), evaluating...restoration carried out by clear-cutting loblolly pine plantations yields a sharp loss of carbon across the installation in these two scenarios (red in...cutting loblolly plantations ~5 years from the baseline. The LEF scenario shows a large, positive impact on carbon sequestration and greater

  19. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  20. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  1. Salton Sea sampling program: baseline studies

    Energy Technology Data Exchange (ETDEWEB)

    Tullis, R.E.; Carter, J.L.; Langlois, G.W.

    1981-04-13

    Baseline data are provided on three species of fish from the Salton Sea, California. The fishes considered were the orange mouth corvina (Cynoscion xanthulus), gulf croaker (Bairdiella icistius) and sargo (Anisotremus davidsonii). Morphometric and meristic data are presented as a baseline to aid in the evaluation of any physiological stress the fish may experience as a result of geothermal development. Analyses were made on muscle, liver, and bone of the fishes sampled to provide baseline data on elemental tissue burdens. The elements measured were: As, Br, Ca, Cu, Fe, Ga, K, Mn, Mi, Pb, Rb, Se, Sr, Zn, and Zr. These data are important if an environmentally sound progression of geothermal power production is to occur at the Salton Sea.

  2. Baseline methodologies for clean development mechanism projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.K. (ed.); Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-15

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  3. Geochemical baseline studies of soil in Finland

    Science.gov (United States)

    Pihlaja, Jouni

    2017-04-01

    The soil element concentrations regionally vary a lot in Finland. Mostly this is caused by the different bedrock types, which are reflected in the soil qualities. Geological Survey of Finland (GTK) is carrying out geochemical baseline studies in Finland. In the previous phase, the research is focusing on urban areas and mine environments. The information can, for example, be used to determine the need for soil remediation, to assess environmental impacts or to measure the natural state of soil in industrial areas or mine districts. The field work is done by taking soil samples, typically at depth between 0-10 cm. Sampling sites are chosen to represent the most vulnerable areas when thinking of human impacts by possible toxic soil element contents: playgrounds, day-care centers, schools, parks and residential areas. In the mine districts the samples are taken from the areas locating outside the airborne dust effected areas. Element contents of the soil samples are then analyzed with ICP-AES and ICP-MS, Hg with CV-AAS. The results of the geochemical baseline studies are published in the Finnish national geochemical baseline database (TAPIR). The geochemical baseline map service is free for all users via internet browser. Through this map service it is possible to calculate regional soil baseline values using geochemical data stored in the map service database. Baseline data for 17 elements in total is provided in the map service and it can be viewed on the GTK's web pages (http://gtkdata.gtk.fi/Tapir/indexEN.html).

  4. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  5. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  6. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  7. Neutrino Interactions and Long-Baseline Experiments

    CERN Document Server

    Mosel, Ulrich

    2016-01-01

    The extraction of neutrino mixing parameters and the CP-violating phase requires knowledge of the neutrino energy. This energy must be reconstructed from the final state of a neutrino-nucleus reaction since all long-baseline experiments use nuclear targets. This reconstruction requires detailed knowledge of the neutrino reactions with bound nucleons and of the final state interactions of hadrons with the nuclear environment. Quantum-kinetic transport theory can be used to build an event generator for this reconstruction that takes basic nuclear properties, such as binding, into account. Some examples are discussed that show the effects of nuclear interactions on observables in long-baseline experiments

  8. Long-baseline Neutrino Oscillation at DUNE

    Science.gov (United States)

    Worcester, Elizabeth; DUNE Collaboration Collaboration

    2017-01-01

    The Deep Underground Neutrino Experiment (DUNE) is a long-baseline neutrino oscillation experiment with primary physics goals of determining the neutrino mass hierarchy and measuring δc P with sufficient sensitivity to discover CP violation in neutrino oscillation. CP violation sensitivity in DUNE requires careful understanding of systematic uncertainty, with contributions expected from uncertainties in the neutrino flux, neutrino interactions, and detector effects. In this presentation, we will describe the expected sensitivity of DUNE to long-baseline neutrino oscillation parameters, how various aspects of the experimental design contribute to that sensitivity, and the planned strategy for constraining systematic uncertainty in these measurements.

  9. Baseline Gas Turbine Development Program eighth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, C.E.

    1974-10-31

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. Major preparations for engine heat balance tests by NASA were completed. EPA laboratories completed Baseline vehicle emissions, noise, and odor tests. Assembly of the program endurance engine is nearing completion. Test cell evaluation of the government furnished combustor (Solar) verified steady state emissions to be extremely low. Initial engine tests of Vendor A ceramic regenerator cores with an elastomeric drive verified performance predictions. Efforts towards developing a non-nickel oxide regenerator seal show extreme sensitivity to porosity differences between cores of different suppliers. All three preprototype integrated control systems were built. Modifications are being worked out to achieve a stable low speed operation. Two prototype compressor turbine wheels made from the reuseable pattern process are being inspected and processed for testing. The engine housing modified for operation at higher cycle temperatures and pressures was received. The baseline engine converted to free rotor is completing test cell check out. The modified vehicle is ready for engine installation. The upgraded engine characterization was updated to include the latest information on V.I.G.V., rotors, and bearings. The upgraded engine housing is being modeled physically and analytically for design and stress studies. An accessory drive system for the upgraded engine was selected, and a final layout is in process.

  10. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  11. An installation for steam conversion of gases

    Energy Technology Data Exchange (ETDEWEB)

    Tabata, K.; Matsumoto, I.

    1983-01-28

    An installation is proposed for steam conversion of a hydrocarbon gas in order to produce an inorganic gas which chiefly consists of H2 and CO in which the line for feeding the hydrocarbon gas has a steam generator which has a microcapillary structure made of sponge metal, inorganic heat resistant fibers of glass, Si02, Al203 or carbon, inorganic heat resistant fibers twisted into a fiber or a cord of multipore ceramic material; the installation is equipped with a heater which regulates the water temperature, in which the steam generator is submerged. The installation is designed for converting natural gas, C3H8, other hydrocarbon gases and vapors of liquid hydrocarbons (Uv) into H2 and CO. The design and disposition of the steam generator simplify the design of the device, eliminating the pump for feeding the steam and the device for premixing of the steam and hydrocarbon gas.

  12. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  13. Waste management project technical baseline description

    Energy Technology Data Exchange (ETDEWEB)

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  14. How Valid Are the Portland Baseline Essays?

    Science.gov (United States)

    Martel, Erich

    1991-01-01

    Portland, Oregon's "African-American Baseline Essays," widely used in creating multicultural curricula, inaccurately depicts ancient Egyptians as black people and Olmec civilization as derived from African influences. The authors advance racial theories long abandoned by mainline Africa scholars, attribute mystical powers to pyramids,…

  15. Physics Potential of Long-Baseline Experiments

    Directory of Open Access Journals (Sweden)

    Sanjib Kumar Agarwalla

    2014-01-01

    Full Text Available The discovery of neutrino mixing and oscillations over the past decade provides firm evidence for new physics beyond the Standard Model. Recently, θ13 has been determined to be moderately large, quite close to its previous upper bound. This represents a significant milestone in establishing the three-flavor oscillation picture of neutrinos. It has opened up exciting prospects for current and future long-baseline neutrino oscillation experiments towards addressing the remaining fundamental questions, in particular the type of the neutrino mass hierarchy and the possible presence of a CP-violating phase. Another recent and crucial development is the indication of non-maximal 2-3 mixing angle, causing the octant ambiguity of θ23. In this paper, I will review the phenomenology of long-baseline neutrino oscillations with a special emphasis on sub-leading three-flavor effects, which will play a crucial role in resolving these unknowns. First, I will give a brief description of neutrino oscillation phenomenon. Then, I will discuss our present global understanding of the neutrino mass-mixing parameters and will identify the major unknowns in this sector. After that, I will present the physics reach of current generation long-baseline experiments. Finally, I will conclude with a discussion on the physics capabilities of accelerator-driven possible future long-baseline precision oscillation facilities.

  16. Geochemical modelling baseline compositions of groundwater

    DEFF Research Database (Denmark)

    Postma, Diederik Jan; Kjøller, Claus; Andersen, Martin Søgaard

    2008-01-01

    Reactive transport models, were developed to explore the evolution in groundwater chemistry along the flow path in three aquifers; the Triassic East Midland aquifer (UK), the Miocene aquifer at Valreas (F) and the Cretaceous aquifer near Aveiro (P). All three aquifers contain very old groundwaters...... of the evolution in natural baseline properties in groundwater....

  17. Solid Waste Program technical baseline description

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  18. Rationing in the presence of baselines

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moreno-Ternero, Juan D.; Østerdal, Lars Peter

    2013-01-01

    We analyze a general model of rationing in which agents have baselines, in addition to claims against the (insufficient) endowment of the good to be allocated. Many real-life problems fit this general model (e.g., bankruptcy with prioritized claims, resource allocation in the public health care...

  19. National Cyberethics, Cybersafety, Cybersecurity Baseline Study

    Science.gov (United States)

    Education Digest: Essential Readings Condensed for Quick Review, 2009

    2009-01-01

    This article presents findings from a study that explores the nature of the Cyberethics, Cybersafety, and Cybersecurity (C3) educational awareness policies, initiatives, curriculum, and practices currently taking place in the U.S. public and private K-12 educational settings. The study establishes baseline data on C3 awareness, which can be used…

  20. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  1. Solar heating system installed at Troy, Ohio

    Science.gov (United States)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  2. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  3. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  4. OPIUM : optimal package install/ uninstall manager

    OpenAIRE

    Tucker, Christopher James

    2008-01-01

    Linux distributions often include package management tools such as apt-get in Debian or yum in RedHat. Using information about package dependencies and conflicts, such tools can determine how to install a new package (and its dependencies on a system of already installed packages. Using off-the-shelf SAT solvers, pseudo-boolean solvers, and Integer Linear Programming solvers, we have developed a new package-management tool, called Opium, that improves on current tools in two ways: (1) Opium i...

  5. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  6. Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail

    Energy Technology Data Exchange (ETDEWEB)

    Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

    1994-01-01

    This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

  7. Future Long-Baseline Neutrino Facilities and Detectors

    Directory of Open Access Journals (Sweden)

    Milind Diwan

    2013-01-01

    Full Text Available We review the ongoing effort in the US, Japan, and Europe of the scientific community to study the location and the detector performance of the next-generation long-baseline neutrino facility. For many decades, research on the properties of neutrinos and the use of neutrinos to study the fundamental building blocks of matter has unveiled new, unexpected laws of nature. Results of neutrino experiments have triggered a tremendous amount of development in theory: theories beyond the standard model or at least extensions of it and development of the standard solar model and modeling of supernova explosions as well as the development of theories to explain the matter-antimatter asymmetry in the universe. Neutrino physics is one of the most dynamic and exciting fields of research in fundamental particle physics and astrophysics. The next-generation neutrino detector will address two aspects: fundamental properties of the neutrino like mass hierarchy, mixing angles, and the CP phase, and low-energy neutrino astronomy with solar, atmospheric, and supernova neutrinos. Such a new detector naturally allows for major improvements in the search for nucleon decay. A next-generation neutrino observatory needs a huge, megaton scale detector which in turn has to be installed in a new, international underground laboratory, capable of hosting such a huge detector.

  8. Fort Stewart integrated resource assessment. Volume 2, Baseline detail

    Energy Technology Data Exchange (ETDEWEB)

    Keller, J.M.; Sullivan, G.P.; Wahlstrom, R.R.; Larson, L.L.

    1993-08-01

    This report documents the assessment of baseline energy use at Fort Stewart, a US Army Forces Command facility located near Savannah, Georgia. This is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. PNL, in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), has designed a model program applicable to the federal sector for this purpose. The model program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Stewart. The analysis examines the characteristics of electric, natural gas, oil, propane, and wood chip use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Fort Stewart by building type, fuel type, and energy end use. A complete energy consumption reconciliation is presented that accounts for the distribution of all major energy uses and losses among buildings, utilities, and central systems.

  9. National INFOSEC technical baseline: multi-level secure systems

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, J P

    1998-09-28

    The purpose of this report is to provide a baseline description of the state of multilevel processor/processing to the INFOSEC Research Council and at their discretion to the R&D community at large. From the information in the report, it is hoped that the members of the IRC will be aware of gaps in MLS research. A primary purpose is to bring IRC and the research community members up to date on what is happening in the MLS arena. The review will attempt to cover what MLS products are still available, and to identify companies who still offer MLS products. We have also attempted to identify requirements for MLS by interviewing senior officers of the Intelligence community as well as those elements of DoD and DOE who are or may be interested in procuring MLS products for various applications. The balance of the report consists of the following sections; a background review of the highlights of the developments of MLS, a quick summary of where we are today in terms of products, installations, and companies who are still in the business of supplying MLS systems [or who are developing MLS system], the requirements as expressed by senior members of the Intelligence community and DoD and DOE, issues and unmet R&D challenges surrounding MLS, and finally a set of recommended research topics.

  10. Baseline Gas Turbine Development Program ninth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, C.E.

    1975-01-31

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. NASA completed the first phase of their baseline engine heat balance tests, and an upgraded engine compressor is being scaled for test. EPA completed their report on vehicle tests including emissions and vehicle performance, and a new endurance engine is on test. Significant development progress was made on both fixed and variable geometry combustors. After 45 hours of engine operation with Vendor A ceramic regenerator, no significant deterioration of the matrix, seals, or elastomeric mount was encountered. Ceramic regenerator stress analysis has commenced. Additional developments in non-nickel oxide regenerator rubbing seals are encouraging. The first preprototype integrated control system is in vehicle operation. Control adaptation for variable inlet guide vanes and water injection is progressing. AiRefrac turbine wheels were verified dimensionally and are being processed for engine testing. Water injection tests with a four nozzle system were run, and additional performance documentation of variable inlet guide vanes was obtained. Linerless insulation is on test in the free rotor engine, the new endurance engine, and a performance engine. The free rotor engine completed test cell checkout and was installed in a vehicle. Vehicle checkout, including a preprototype integrated control, is underway. Detailed specifications of the upgraded engine were written.

  11. On the Modelling of Pile Installation

    NARCIS (Netherlands)

    Dijkstra, J.

    2009-01-01

    This thesis introduces two different types of physical model tests to investigate the stress and density change in the soil during installation of a jacked pile as well as two numerical modelling approaches to model the same process in a finite element code capable of large deformations.

  12. Standard hydrogen monitoring system equipment installation instructions

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  13. Safety and Inspection Planning of Older Installations

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Ersdal, G.

    2007-01-01

    time intervals for ageing structures. Different approaches for updating inspection plans for older installations are proposed.The most promising method consists in increasing the rate of crack initiations at the end of the expected lifetime - corresponding to a bath-tube hazard rate effect.The approach...

  14. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  15. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  16. A tangible digital installation in the classroom

    DEFF Research Database (Denmark)

    Marchetti, Emanuela; Valente, Andrea

    2015-01-01

    : facilitating the emergence of imagination and conceptual thinking, and managing the interplay between cooperation and competition. This cooperation originates from one of the teachers’ interest in MicroCulture, a digital and tangible installation earlier created by the authors and aimed at bridging history...

  17. Installation of the ALICE dipole magnet

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The large dipole magnet is installed on the ALICE detector at CERN. This magnet, which is cooled by demineralised water, will bend the path of muons that leave the huge rectangular solenoid (in the background). These muons are heavy electrons that interact less with matter, allowing them to traverse the main section of the detector.

  18. Public Address Systems. Specifications - Installation - Operation.

    Science.gov (United States)

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  19. Participatory ergonomics applied in installation work

    NARCIS (Netherlands)

    Jong, A.M. de; Vink, P.

    2002-01-01

    This paper evaluates a step-by-step participatory approach to better work, applied in reducing the musculoskeletal workload in installation work. To arrive at a reduction in workload, a steering group led the project through the following steps: Introduction: defining the goal and informing all 7000

  20. 14 CFR 23.1061 - Installation.

    Science.gov (United States)

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Liquid Cooling § 23.1061 Installation. (a) General. Each liquid-cooled engine must have an independent cooling system (including coolant... must be treated to prevent absorption of flammable fluids; and (4) No air or vapor can be trapped...

  1. Installation of the LHC transfer lines begins

    CERN Document Server

    2003-01-01

    On 19 February, the very first magnet was installed in one of the two tunnels that will house the transfer lines leading to the LHC. This magnet, recycled from a previous facility, was transported and positioned using a novel system designed for conveying large objects through narrow tunnels.

  2. Tow techniques for marine pipeline installation

    NARCIS (Netherlands)

    Fernández, M.L.

    1981-01-01

    Tow techniques for marine pipelines frequently offer competitive and commercially attactive solutions over other installation methods and, on occasion, may represent the only alternative to traditional techniques. An assessment is also made of where each tow method is applicable and technically feas

  3. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  4. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  5. The Swiss nuclear installations. Annual report 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs.

  6. CASA Uno GPS orbit and baseline experiments

    Science.gov (United States)

    Schutz, B. E.; Ho, C. S.; Abusali, P. A. M.; Tapley, B. D.

    1990-01-01

    CASA Uno data from sites distributed in longitude from Australia to Europe have been used to determine orbits of the GPS satellites. The characteristics of the orbits determined from double difference phase have been evaluated through comparisons of two-week solutions with one-week solutions and by comparisons of predicted and estimated orbits. Evidence of unmodeled effects is demonstrated, particularly associated with the orbit planes that experience solar eclipse. The orbit accuracy has been assessed through the repeatability of unconstrained estimated baseline vectors ranging from 245 km to 5400 km. Both the baseline repeatability and the comparison with independent space geodetic methods give results at the level of 1-2 parts in 100,000,000. In addition, the Mojave/Owens Valley (245 km) and Kokee Park/Ft. Davis (5409 km) estimates agree with VLBI and SLR to better than 1 part in 100,000,000.

  7. Joint Multi-baseline SAR Interferometry

    Directory of Open Access Journals (Sweden)

    S. Tebaldini

    2005-12-01

    Full Text Available We propose a technique to provide interferometry by combining multiple images of the same area. This technique differs from the multi-baseline approach in literature as (a it exploits all the images simultaneously, (b it performs a spectral shift preprocessing to remove most of the decorrelation, and (c it exploits distributed targets. The technique is mainly intended for DEM generation at centimetric accuracy, as well as for differential interferometry. The problem is framed in the contest of single-input multiple-output (SIMO channel estimation via the cross-relations (CR technique and the resulting algorithm provides significant improvements with respect to conventional approaches based either on independent analysis of single interferograms or multi-baselines phase analysis of single pixels of current literature, for those targets that are correlated in all the images, like for long-term coherent areas, or for acquisitions taken with a short revisit time (as those gathered with future satellite constellations.

  8. Dissipative Effect in Long Baseline Neutrino Experiments

    CERN Document Server

    Oliveira, Roberto L N

    2016-01-01

    The propagation of neutrinos in long baselines experiments may be influenced by dissipation effects. Using Lindblad Master Equation we evolve neutrinos taking into account these dissipative effects. The MSW and the dissipative effects may change the probabilities behavior. In this work, we show and explain how the behavior of the probabilities can change due to the decoherence and relaxation effects acting individually with the MSW effect. A new exotic peak appears in this case and we show the difference between the decoherence and relaxation effects in the appearance of this peak. We also adapt the usual approximate expression for survival and appearance probabilities with all possible decoherence effects. We suppose the baseline of DUNE and show how each decoherence parameters change the probabilities analyzing the possible modification using numeric and analytic approach.

  9. CASA Uno GPS orbit and baseline experiments

    Science.gov (United States)

    Schutz, B. E.; Ho, C. S.; Abusali, P. A. M.; Tapley, B. D.

    1990-01-01

    CASA Uno data from sites distributed in longitude from Australia to Europe have been used to determine orbits of the GPS satellites. The characteristics of the orbits determined from double difference phase have been evaluated through comparisons of two-week solutions with one-week solutions and by comparisons of predicted and estimated orbits. Evidence of unmodeled effects is demonstrated, particularly associated with the orbit planes that experience solar eclipse. The orbit accuracy has been assessed through the repeatability of unconstrained estimated baseline vectors ranging from 245 km to 5400 km. Both the baseline repeatability and the comparison with independent space geodetic methods give results at the level of 1-2 parts in 100,000,000. In addition, the Mojave/Owens Valley (245 km) and Kokee Park/Ft. Davis (5409 km) estimates agree with VLBI and SLR to better than 1 part in 100,000,000.

  10. Systematic errors in long baseline oscillation experiments

    Energy Technology Data Exchange (ETDEWEB)

    Harris, Deborah A.; /Fermilab

    2006-02-01

    This article gives a brief overview of long baseline neutrino experiments and their goals, and then describes the different kinds of systematic errors that are encountered in these experiments. Particular attention is paid to the uncertainties that come about because of imperfect knowledge of neutrino cross sections and more generally how neutrinos interact in nuclei. Near detectors are planned for most of these experiments, and the extent to which certain uncertainties can be reduced by the presence of near detectors is also discussed.

  11. The Gambia Impact Evaluation Baseline Report

    OpenAIRE

    2015-01-01

    The Government of The Gambia is implementing the Maternal and Child Nutrition and Health Results Project (MCNHRP) to increase the utilization of community nutrition and primary maternal and child health services. In collaboration with the Government, the World Bank is conducting an impact evaluation (IE) to assess the impact of the project on key aspects of maternal and child nutrition and health. The baseline survey for the MCNHRP IE took place between November 2014 and February 2015. It c...

  12. Geochemical baseline data, Youngs Bay, Oregon, 1974

    Energy Technology Data Exchange (ETDEWEB)

    McMechan, K.J. (ed.); Johnson, V.G.; Cutshall, N.H.

    1975-04-01

    This report comprises one part of a final report to the Alumax Pacific Aluminum Corporation on the Physical, Chemical and Biological Studies of Youngs Bay''. The data reported herein are the product of the geochemical baseline section of the project. The primary objectives of the geochemical study were: to provide a baseline record of fluoride and selected trace metal levels in Youngs Bay bottom sediment, to identify areas that might function as heavy metal traps, to attempt to determine the recent depositional history of sediment in the bay. In addition to these primary objectives, a number of secondary tasks were undertaken during the study. While time did not allow these additional studies to be carried to completion, preliminary results are included herein because of their potential usefulness in assessing the impact of environmental releases of fluoride to aquatic systems in the vicinity of Youngs Bay or elsewhere. This report is made up of two major sections. In the first, a description of sample collection and analytical procedures is followed by a discussion of the baseline results. Obvious vertical and horizontal patterns of elemental distribution are identified and their origins considered. Problems needed further research are also discussed. In the second section, the data are presented in interpretive, graphical form, as well as in tables. 35 refs., 29 figs., 14 tabs.

  13. Efficient Wide Baseline Structure from Motion

    Science.gov (United States)

    Michelini, Mario; Mayer, Helmut

    2016-06-01

    This paper presents a Structure from Motion approach for complex unorganized image sets. To achieve high accuracy and robustness, image triplets are employed and (an approximate) camera calibration is assumed to be known. The focus lies on a complete linking of images even in case of large image distortions, e.g., caused by wide baselines, as well as weak baselines. A method for embedding image descriptors into Hamming space is proposed for fast image similarity ranking. The later is employed to limit the number of pairs to be matched by a wide baseline method. An iterative graph-based approach is proposed formulating image linking as the search for a terminal Steiner minimum tree in a line graph. Finally, additional links are determined and employed to improve the accuracy of the pose estimation. By this means, loops in long image sequences are implicitly closed. The potential of the proposed approach is demonstrated by results for several complex image sets also in comparison with VisualSFM.

  14. Financial guarantees for the wastes storage installations; Garanties financieres pour les installations de stockage de dechets

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The law of the 19 july 1976 specifies that the implementing of wastes storage installations, which present a risk for the public health or for the soils contamination, is submitted to financial guarantees settlement. These guarantees are devoted to provide the survey of the site and the safety control of the installation (accidents and rehabilitation). This paper presents the new rules of the financial guarantees calculation and specifies the application field. Example of cost and calculation are included. (A.L.B.)

  15. CosmoMC Installation and Running Guidelines

    CERN Document Server

    Li, Ming-Hua

    2014-01-01

    CosmoMC is a Fortran 95 Markov-Chain Monte-Carlo (MCMC) engine to explore the cosmological parameter space, plus a Python suite for plotting and presenting results (see http://cosmologist.info/cosmomc/). This document describes the installation of the CosmoMC on a Linux system (Ubuntu 14.04.1 LTS 64-bit version). It is written for those who want to use it in their scientific research but without much training on Linux and the program. Besides a step-by-step installation guide, we also give a brief introduction of how to run the program on both a desktop and a cluster. We share our way to generate the plots that are commonly used in the references of cosmology. For more information, one can refer to the CosmoCoffee forum (http://cosmocoffee.info/viewforum.php?f=11) or contact the authors of this document. Questions and comments would be much appreciated.

  16. Software safety analysis practice in installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W.; Chen, M. H.; Shyu, S. S., E-mail: hwhwang@iner.gov.t [Institute of Nuclear Energy Research, No. 1000 Wenhua Road, Chiaan Village, Longtan Township, 32546 Taoyuan County, Taiwan (China)

    2010-10-15

    This work performed a software safety analysis in the installation phase of the Lung men nuclear power plant in Taiwan, under the cooperation of Institute of Nuclear Energy Research and Tpc. The US Nuclear Regulatory Commission requests licensee to perform software safety analysis and software verification and validation in each phase of software development life cycle with Branch Technical Position 7-14. In this work, 37 safety grade digital instrumentation and control systems were analyzed by failure mode and effects analysis, which is suggested by IEEE standard 7-4.3.2-2003. During the installation phase, skew tests for safety grade network and point to point tests were performed. The failure mode and effects analysis showed all the single failure modes can be resolved by the redundant means. Most of the common mode failures can be resolved by operator manual actions. (Author)

  17. Installation Capacity Assessment of Damaged Deepwater Pipelines

    Directory of Open Access Journals (Sweden)

    Ramasamy R.

    2014-07-01

    Full Text Available The worldwide exploration and development of subsea and deepwater reservoirs has laid down some new and old engineering challenges to the offshore pipeline industry. This requires large D/t pipelines to be installed at water depths in the vicinity of up to 2700m. The deepwater collapse and buckle propagation event is almost unavoidable as the pipe wall thickness cannot be always determined from the codes and standards due to the limit state criteria. These codes also do not consider any fabrication imperfections and sustained damages emanating from transportation and handling. The objective of this paper is to present the Finite Element Analysis (FEA of dented pipes with D/t ratio more than 45, which is outside the applicability of current design codes, and to investigate the effects on installation capacity of these various damage sizes in terms of collapse and buckle propagation.

  18. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  19. The installation of the Gerda muon veto

    Energy Technology Data Exchange (ETDEWEB)

    Freund, Kai; Dietrich, Dennis; Grabmayr, Peter; Hegai, Alexander; Jochum, Josef; Knapp, Markus; Meierhofer, Georg; Ritter, Florian [Kepler Center for Astro and Particle Physics, Eberhard Karls Universitaet Tuebingen (Germany)

    2010-07-01

    The Gerda collaboration aims to determine the half-life of the neutrinoless double beta decay (0{nu}{beta}{beta}) of {sup 76}Ge. Due to the long half life of this decay (T{sub 1/2}>10{sup 25}y), the experimental background must be reduced at least to a level of 10{sup -3} counts/(kg.y.keV) in the region around Q{sub {beta}}{sub {beta}}. Cosmic muons induce a part of this dangerous background and must be detected in order to generate a veto signal. Part of this veto system is a water Cherenkov detector surrounding the cryostat which contains the germanium crystals. The Cherenkov veto was simulated, designed and installed by the astroparticle group in Tuebingen. The veto consists of 66 photomultiplier (8 inch), a calibration and monitoring system, reflective VM2000 foil and the control electronics. In this talk the veto, its design and accomplished installation is presented.

  20. TMS installation at A-1 Test Stand

    Science.gov (United States)

    2010-01-01

    Employees at NASA's John C. Stennis Space Center complete installation of the new thrust measurement system on the A-1 Test Stand. The new TMS is a state-of-the-art upgrade from the previous system, which was installed when the testing structure was built in the 1960s. It is an advanced calibration system capable of measuring vertical and horizontal thrust loads with accuracy within 0.15 percent at 225,000 pounds. It also will allow engineers to measure thrust as they gimbal (or tilt) engines during tests. The new TMS is part of upgrades for the A-1 Test Stand in preparation for testing the next generation of American space program rocket engines.

  1. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  2. Solar heating system installed at Stamford, Connecticut

    Science.gov (United States)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  3. CASTOR Calorimeter Installation Review at CMS

    CERN Multimedia

    CERN Video Productions

    2011-01-01

    This test is a part of CASTOR EDR process. The CASTOR phys-tech review held on 14 Jan 2011 and the subsequent EDR held on 17 Jun 2011, the CMS Management Board has endorsed a strategy in which CASTOR is removed during the 2011 Year-End Technical Stop, but is then refurbished, replacing a substantial fraction of the phototubes, so that it is ready for re-installation in the Technical Stop just before 2012 heavy-ion operation.

  4. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  5. MICROCOSM - INSTALLATION OF THE LHC MODEL

    CERN Multimedia

    2002-01-01

    This week, installation of a 6m long section of the LHC starts in Microcosm. This full-scale model is the first part of a new exhibition highlighting the technological challenges and the exciting physics of the LHC era. Many people at CERN have helped with the preparations for the model and the Microcosm team would like to thank all those involved. An inauguration for the press will take place at the start of the next school term.

  6. Numerical simulation of installation of skirt foundations

    Energy Technology Data Exchange (ETDEWEB)

    Vangelsten, Bjoern Vidar

    1997-12-31

    Skirt foundation has been increasingly used for permanent offshore oil installations and anchors for drilling ships. Suction is commonly used in skirt foundation installing. If a large amount of suction is applied, the soil around the foundation may fail and the foundation become useless. This thesis studies failure due to high seepage gradients, aiming to provide a basis for reducing the risk of such failures. Skirt penetration model testing has shown that to solve the problem one must understand what is going on at the skirt tip during suction installation. A numerical model based on micro mechanics was developed as continuum hypothesis was seen to be unsuitable to describe the processes in the critical phases of the failure. The numerical model combines two-dimensional elliptical particles with the finite difference method for flow to model water flow in a granular material. The key idea is to formulate the permeability as a function of the porosity of the grain assembly and so obtain an interaction between the finite difference method on flow and the particle movement. A computer program, DYNELL, was developed and used to simulate: (1) weight penetration of a skirt wall, (2) combined suction and weight penetration of a skirt wall, and (3) critical gradient tests around a skirt wall to study failure mechanisms. The model calculations agree well with laboratory experiments. 16 refs., 124 figs., 21 tabs.

  7. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  8. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  9. Very Long Baseline Interferometry with the SKA

    CERN Document Server

    Paragi, Zsolt; Reynolds, Cormac; Rioja, Maria; Deller, Adam; Zhang, Bo; Gurvits, Leonid; Bietenholz, Michael; Szomoru, Arpad; Bignall, Hayley; Boven, Paul; Charlot, Patrick; Dodson, Richard; Frey, Sandor; Garrett, Michael; Imai, Hiroshi; Lobanov, Andrei; Reid, Mark; Ros, Eduardo; van Langevelde, Huib; Zensus, J Anton; Zheng, Xing Wu; Alberdi, Antxon; Agudo, Ivan; An, Tao; Argo, Megan; Beswick, Rob; Biggs, Andy D; Brunthaler, Andreas; Campbell, Robert M; Cimo, Giuseppe; Colomer, Francisco; Corbel, Stephane; Conway, John; Cseh, David; Deane, Roger; Falcke, Heino; Gabanyi, Krisztina; Gawronski, Marcin; Gaylard, Michael; Giovannini, Gabriele; Giroletti, Marcello; Goddi, Ciriaco; Goedhart, Sharmila; Gomez, Jose L; Gunn, Alastair; Jung, Taehyun; Kharb, Preeti; Klockner, Hans-Rainer; Kording, Elmar; Kovalev, Yurii Yu; Kunert-Bajraszewska, Magdalena; Lindqvist, Michael; Lister, Matt; Mantovani, Franco; Marti-Vidal, Ivan; Mezcua, Mar; McKean, John; Middelberg, Enno; Miller-Jones, James; Moldon, Javier; Muxlow, Tom; O'Brien, Tim; Pérez-Torres, Miguel; Pogrebenko, Sergei; Quick, Jonathan; Rushton, Anthony P; Schilizzi, Richard; Smirnov, Oleg; Sohn, Bong Won; Surcis, Gabriele; Taylor, Greg; Tingay, Steven; Tudose, Valeriu; van der Horst, Alexander; van Leeuwen, Joeri; Venturi, Tiziana; Vermeulen, Rene; Vlemmings, Wouter; de Witt, Aletha; Wucknitz, Olaf; Yang, Jun

    2014-01-01

    Adding VLBI capability to the SKA arrays will greatly broaden the science of the SKA, and is feasible within the current specifications. SKA-VLBI can be initially implemented by providing phased-array outputs for SKA1-MID and SKA1-SUR and using these extremely sensitive stations with other radio telescopes, and in SKA2 by realising a distributed configuration providing baselines up to thousands of km, merging it with existing VLBI networks. The motivation for and the possible realization of SKA-VLBI is described in this paper.

  10. Optimization of the CLIC Baseline Collimation System

    Energy Technology Data Exchange (ETDEWEB)

    Resta-Lopez, Javier; /Oxford U., JAI; Angal-Kalinin, Deepa; /Daresbury; Fernandez-Hernando, Juan; /Daresbury; Jackson, Frank; /Daresbury; Dalena, Barbara; /CERN; Schulte, Daniel; /CERN; Tomas, Rogelio; /CERN; Seryi, Andrei; /SLAC

    2012-07-06

    Important efforts have recently been dedicated to the improvement of the design of the baseline collimation system of the Compact Linear Collider (CLIC). Different aspects of the design have been optimized: the transverse collimation depths have been recalculated in order to reduce the collimator wakefield effects while maintaining a good efficiency in cleaning the undesired beam halo; the geometric design of the spoilers have also been reviewed to minimize wakefields; in addition, the optics design have been polished to improve the collimation efficiency. This paper describes the current status of the CLIC collimation system after this optimization.

  11. SRP baseline hydrogeologic investigation: Aquifer characterization

    Energy Technology Data Exchange (ETDEWEB)

    Strom, R.N.; Kaback, D.S.

    1992-03-31

    An investigation of the mineralogy and chemistry of the principal hydrogeologic units and the geochemistry of the water in the principal aquifers at Savannah River Site (SRS) was undertaken as part of the Baseline Hydrogeologic Investigation. This investigation was conducted to provide background data for future site studies and reports and to provide a site-wide interpretation of the geology and geochemistry of the Coastal Plain Hydrostratigraphic province. Ground water samples were analyzed for major cations and anions, minor and trace elements, gross alpha and beta, tritium, stable isotopes of hydrogen, oxygen, and carbon, and carbon-14. Sediments from the well borings were analyzed for mineralogy and major and minor elements.

  12. Baseline Response Levels Are a Nuisance in Infant Contingency Learning

    Science.gov (United States)

    Millar, W. S.; Weir, Catherine

    2015-01-01

    The impact of differences in level of baseline responding on contingency learning in the first year was examined by considering the response acquisition of infants classified into baseline response quartiles. Whereas the three lower baseline groups showed the predicted increment in responding to a contingency, the highest baseline responders did…

  13. Physics Potential of Long-Baseline Experiments

    CERN Document Server

    Agarwalla, Sanjib Kumar

    2014-01-01

    The discovery of neutrino mixing and oscillations over the past decade provides firm evidence for new physics beyond the Standard Model. Recently, theta13 has been determined to be moderately large, quite close to its previous upper bound. This represents a significant milestone in establishing the three-flavor oscillation picture of neutrinos. It has opened up exciting prospects for current and future long-baseline neutrino oscillation experiments towards addressing the remaining fundamental questions, in particular the type of the neutrino mass hierarchy and the possible presence of a CP-violating phase. Another recent and crucial development is the indication of non-maximal 2-3 mixing angle, causing the octant ambiguity of theta23. In this paper, I will review the phenomenology of long-baseline neutrino oscillations with a special emphasis on sub-leading three-flavor effects, which will play a crucial role in resolving these unknowns. First, I will give a brief description of neutrino oscillation phenomeno...

  14. Baseline and benchmark model development for hotels

    Science.gov (United States)

    Hooks, Edward T., Jr.

    The hotel industry currently faces rising energy costs and requires the tools to maximize energy efficiency. In order to achieve this goal a clear definition of the current methods used to measure and monitor energy consumption is made. Uncovering the limitations to the most common practiced analysis strategies and presenting methods that can potentially overcome those limitations is the main purpose. Techniques presented can be used for measurement and verification of energy efficiency plans and retrofits. Also, modern energy modeling tool are introduced to demonstrate how they can be utilized for benchmarking and baseline models. This will provide the ability to obtain energy saving recommendations and parametric analysis to explore energy savings potential. These same energy models can be used in design decisions for new construction. An energy model is created of a resort style hotel that over one million square feet and has over one thousand rooms. A simulation and detailed analysis is performed on a hotel room. The planning process for creating the model and acquiring data from the hotel room to calibrate and verify the simulation will be explained. An explanation as to how this type of modeling can potentially be beneficial for future baseline and benchmarking strategies for the hotel industry. Ultimately the conclusion will address some common obstacles the hotel industry has in reaching their full potential of energy efficiency and how these techniques can best serve them.

  15. Vegetation baseline report : Connacher great divide project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-08-01

    This baseline report supported an application by Connacher Oil and Gas Ltd. to the Alberta Energy and Utilities Board (EUB) and Alberta Environment (AENV) for the Great Divide Steam Assisted Gravity Drainage (SAGD) Project. The goal of the report was to document the distribution and occurrence of ecosite phases and wetland classes in the project footprint as well as to document the distribution of rare plants; rare plant communities: and intrusive species and old growth communities, including species of management concern. A methodology of the baseline report was presented, including details of mapping and field surveys. Six vegetation types in addition to the disturbed land unit were identified in the project footprint and associated buffer. It was noted that all vegetation types are common for the boreal forest natural regions. Several species of management concern were identified during the spring rare plant survey, including rare bryophytes and non-native or invasive species. Mitigation was identified through a slight shift of the footprint, transplant of appropriate bryophyte species and implementation of a weed management plan. It was noted that results of future surveys for rare plants will be submitted upon completion. It was concluded that the effects of the project on existing vegetation is expected to be low because of the small footprint, prior disturbance history, available mitigation measures and conservation and reclamation planning. 27 refs., 5 tabs., 4 figs.

  16. High-intensity urban light installation dramatically alters nocturnal bird migration.

    Science.gov (United States)

    Van Doren, Benjamin M; Horton, Kyle G; Dokter, Adriaan M; Klinck, Holger; Elbin, Susan B; Farnsworth, Andrew

    2017-10-02

    Billions of nocturnally migrating birds move through increasingly photopolluted skies, relying on cues for navigation and orientation that artificial light at night (ALAN) can impair. However, no studies have quantified avian responses to powerful ground-based light sources in urban areas. We studied effects of ALAN on migrating birds by monitoring the beams of the National September 11 Memorial & Museum's "Tribute in Light" in New York, quantifying behavioral responses with radar and acoustic sensors and modeling disorientation and attraction with simulations. This single light source induced significant behavioral alterations in birds, even in good visibility conditions, in this heavily photopolluted environment, and to altitudes up to 4 km. We estimate that the installation influenced ≈1.1 million birds during our study period of 7 d over 7 y. When the installation was illuminated, birds aggregated in high densities, decreased flight speeds, followed circular flight paths, and vocalized frequently. Simulations revealed a high probability of disorientation and subsequent attraction for nearby birds, and bird densities near the installation exceeded magnitudes 20 times greater than surrounding baseline densities during each year's observations. However, behavioral disruptions disappeared when lights were extinguished, suggesting that selective removal of light during nights with substantial bird migration is a viable strategy for minimizing potentially fatal interactions among ALAN, structures, and birds. Our results also highlight the value of additional studies describing behavioral patterns of nocturnally migrating birds in powerful lights in urban areas as well as conservation implications for such lighting installations.

  17. LHC: installation du plus grand trajectographe au silicium du monde

    CERN Document Server

    2008-01-01

    The installation of the largest silicon trajectograph of the world was concluded at CERN. Thursday December 13 at dawn, the silicon trajectograph with ribbons of CMS (*) began its trip from the principal site of CERN to its installation of experimentation.

  18. Installation of some Cathode Strip Chambers on March 2004

    CERN Multimedia

    Richard Breedon

    2004-01-01

    Installation on the Disk of some Cathode Strip Chambers, type ME3/1, produced in the US. The installation has been performed on March 2004 at the CMS experimental site SX5 (P5) in Cessy, neighbouring France.

  19. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  20. Radio sources - Very, Very Long Baseline Interferometry

    Science.gov (United States)

    Roberts, D. H.

    1983-03-01

    With resolution of a thousandth of an arcsecond, the radio technique of Very Long Baseline Interferometry (VLBI) provides astronomers with their highest-resolution view of the universe. Data taken with widely-separated antennas are combined, with the help of atomic clocks, to form a Michelson interferometer whose size may be as great as the earth's diameter. Extraordinary phenomena, from the birth of stars as signaled by the brilliant flashes of powerful interstellar masers to the 'faster-than-light' expansion of the cores of distant quasars, are being explored with this technique. However, earth-bound VLBI suffers from several restrictions due to the location of the component antennas at fixed places on the earth's surface. The use of one or more antennas in space in concert with ground-based equipment will greatly expand the technical and scientific capabilities of VLBI, leading to a more complete and even higher resolution view of cosmic phenomena.

  1. The OPERA long baseline neutrino oscillation experiment

    Science.gov (United States)

    Wilquet, G.

    2008-05-01

    OPERA is a long baseline neutrino oscillation experiment designed to observe the appearance of vτ in a pure vμ beam in the parameter space indicated by the atmospheric neutrinos oscillation signal. The detector is situated in the underground LNGS laboratory under 3 800 water meter equivalent at a distance of 730 km from CERN where the CNGS neutrino beam to which it is exposed originates. It consists of two identical 0.68 kilotons lead/nuclear emulsion targets, each instrumented with a tracking device and complemented by a muon spectrometer. The concept and the status of the detector are described and the first results obtained with cosmic rays and during two weeks of beam commissioning in 2006 are reported.

  2. In-Space Manufacturing Baseline Property Development

    Science.gov (United States)

    Stockman, Tom; Schneider, Judith; Prater, Tracie; Bean, Quincy; Werkheiser, Nicki

    2016-01-01

    The In-Space Manufacturing (ISM) project at NASA Marshall Space Flight Center currently operates a 3D FDM (fused deposition modeling) printer onboard the International Space Station. In order to enable utilization of this capability by designer, the project needs to establish characteristic material properties for materials produced using the process. This is difficult for additive manufacturing since standards and specifications do not yet exist for these technologies. Due to availability of crew time, there are limitations to the sample size which in turn limits the application of the traditional design allowables approaches to develop a materials property database for designers. In this study, various approaches to development of material databases were evaluated for use by designers of space systems who wish to leverage in-space manufacturing capabilities. This study focuses on alternative statistical techniques for baseline property development to support in-space manufacturing.

  3. Pentek concrete scabbling system: Baseline report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-31

    The Pentek scabbling technology was tested at Florida International University (FIU) and is being evaluated as a baseline technology. This report evaluates it for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek concrete scabbling system consisted of the MOOSE{reg_sign}, SQUIRREL{reg_sign}-I, and SQUIRREL{reg_sign}-III scabblers. The scabblers are designed to scarify concrete floors and slabs using cross-section, tungsten carbide tipped bits. The bits are designed to remove concrete in 318 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation during the human factors assessment focused on two main areas: noise and dust.

  4. Steganography Based on Baseline Sequential JPEG Compression

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Information hiding in Joint Photographic Experts Group (JPEG) compressed images are investigated in this paper. Quantization is the source of information loss in JPEG compression process. Therefore, information hidden in images is probably destroyed by JPEG compression. This paper presents an algorithm to reliably embed information into the JPEG bit streams in the process of JPEG encoding. Information extraction is performed in the process of JPEG decoding. The basic idea of our algorithm is to modify the quantized direct current (DC) coefficients and non-zero alternating current (AC) coefficients to represent one bit information (0 or 1). Experimental results on gray images using baseline sequential JPEG encoding show that the cover images (images without secret information) and the stego-images (images with secret information) are perceptually indiscernible.

  5. Intensity interferometry: Optical imaging with kilometer baselines

    CERN Document Server

    Dravins, Dainis

    2016-01-01

    Optical imaging with microarcsecond resolution will reveal details across and outside stellar surfaces but requires kilometer-scale interferometers, challenging to realize either on the ground or in space. Intensity interferometry, electronically connecting independent telescopes, has a noise budget that relates to the electronic time resolution, circumventing issues of atmospheric turbulence. Extents up to a few km are becoming realistic with arrays of optical air Cherenkov telescopes (primarily erected for gamma-ray studies), enabling an optical equivalent of radio interferometer arrays. Pioneered by Hanbury Brown and Twiss, digital versions of the technique have now been demonstrated, reconstructing diffraction-limited images from laboratory measurements over hundreds of optical baselines. This review outlines the method from its beginnings, describes current experiments, and sketches prospects for future observations.

  6. Long-Baseline Neutrino Oscillation Experiments

    CERN Document Server

    Sousa, Alexandre

    2011-01-01

    During the past decade, long-baseline neutrino experiments played a fundamental role in confirming neutrino flavor change and in measuring the neutrino mixing matrix with high precision. This role will be amplified with the next generation of experiments, which will begin probing the possibility of CP violation in the leptonic sector and possibly pin down the neutrino mass hierarchy. An account of the most recent results from the MINOS experiment is presented, along with the earlier measurement from the K2K experiment. The next generation projects, T2K and NOvA, are described and their current status, schedule and physics reach discussed. Finally, we report on future efforts, currently in the R&D stage, such as the LBNE and T2KK projects.

  7. The WITCH Model. Structure, Baseline, Solutions.

    Energy Technology Data Exchange (ETDEWEB)

    Bosetti, V.; Massetti, E.; Tavoni, M.

    2007-07-01

    WITCH - World Induced Technical Change Hybrid - is a regionally disaggregated hard link hybrid global model with a neoclassical optimal growth structure (top down) and an energy input detail (bottom up). The model endogenously accounts for technological change, both through learning curves affecting prices of new vintages of capital and through R and D investments. The model features the main economic and environmental policies in each world region as the outcome of a dynamic game. WITCH belongs to the class of Integrated Assessment Models as it possesses a climate module that feeds climate changes back into the economy. In this paper we provide a thorough discussion of the model structure and baseline projections. We report detailed information on the evolution of energy demand, technology and CO2 emissions. Finally, we explicitly quantifiy the role of free riding in determining the emissions scenarios. (auth)

  8. Octant degeneracy, CPV phase at Long Baseline $\

    CERN Document Server

    Bora, Kalpana; Dutta, Debajyoti

    2015-01-01

    In a recent work by two of us, we have studied, how CP violation discovery potential can be improved at long baseline neutrino experiments (LBNE/DUNE), by combining with its ND (near detector) and reactor experiments. In this work, we discuss how this study can be further analysed to resolve entanglement of the quadrant of CPV phase and Octant of atmospheric mixing angle {\\theta}23, at LBNEs. The study is done for both NH (Normal hierarchy) and IH (Inverted hierarchy). We further show how leptogenesis can enhance this effect of resolving this entanglement. A detailed analytic and numerical study of baryogenesis through leptogenesis is performed in this framework in a model independent way. We then compare our result of the baryon to photon ratio with the the current observational data of the baryon asymmetry.

  9. Tightly coupled long baseline/ultra-short baseline integrated navigation system

    Science.gov (United States)

    Batista, Pedro; Silvestre, Carlos; Oliveira, Paulo

    2016-06-01

    This paper proposes a novel integrated navigation filter based on a combined long baseline/ultra short baseline acoustic positioning system with application to underwater vehicles. With a tightly coupled structure, the position, linear velocity, attitude, and rate gyro bias are estimated, considering the full nonlinear system dynamics without resorting to any algebraic inversion or linearisation techniques. The resulting solution ensures convergence of the estimation error to zero for all initial conditions, exponentially fast. Finally, it is shown, under simulation environment, that the filter achieves very good performance in the presence of sensor noise.

  10. Owning the program technical baseline for future space systems acquisition: program technical baseline tracking tool

    Science.gov (United States)

    Nguyen, Tien M.; Guillen, Andy T.; Hant, James J.; Kizer, Justin R.; Min, Inki A.; Siedlak, Dennis J. L.; Yoh, James

    2017-05-01

    The U.S. Air Force (USAF) has recognized the needs for owning the program and technical knowledge within the Air Force concerning the systems being acquired to ensure success. This paper extends the previous work done by the authors [1-2] on the "Resilient Program Technical Baseline Framework for Future Space Systems" and "Portfolio Decision Support Tool (PDST)" to the development and implementation of the Program and Technical Baseline (PTB) Tracking Tool (PTBTL) for the DOD acquisition life cycle. The paper describes the "simplified" PTB tracking model with a focus on the preaward phases and discusses how to implement this model in PDST.

  11. Basic electrical installation work level 2

    CERN Document Server

    Linsley, Trevor

    2015-01-01

    Everything needed to pass the first part of the City & Guilds 2365 Diploma in Electrical InstallationsUpdated in line with the 3rd Amendment of the 17th Edition IET Wiring Regulations, this new edition covers the City & Guilds 2365-02 course. Written in an accessible style with a chapter dedicated to each unit of the syllabus, this book helps you to master each topic before moving on to the next. End of chapter revision questions enable learners to check their understanding and consolidate key concepts learnt in each chapter. With a companion website containing videos, animations, worksheets a

  12. RF installation for the grain disinfestation

    CERN Document Server

    Zajtzev, B V; Kobetz, A F; Rudiak, B I

    2001-01-01

    The ecologically pure method of grain product disinfestations through the grain treatment with the RF electric field is described. The experimental data obtained showed that with strengths of the electrical RF field of E=5 kV/cm and frequency of 80 MHz the relative death rate is 100%.The time of the grain treatment it this case is 1 sec. The pulses with a duration of 600 mu s and repetition rate of 2 Hz were used, the duration of the front was 10 mu s. The schematic layout of installation with a productivity of 50 tones/h and power of 10 kW is given.

  13. Small wind planning and building successful installations

    CERN Document Server

    Clark, Nolan

    2013-01-01

    This book provides a cohesive guide to achieving successful small wind installations. It is a comprehensive information resource from one of the world's most experienced small wind professionals, covering all the key issues for small wind system development, from site and machine selection to international standards compliance. Engineers who are tasked with planning and developing these small wind systems, from choosing the best site and accurately estimating likely power output to obtaining proper permitting and troubleshooting operational inefficiencies, will find this book an ess

  14. Introduction to Linux installation and programming

    CERN Document Server

    Venkateswarlu, N B

    2008-01-01

    Since early 1970, Unix Operating System has gone through many metamorphosis. As of now many variants of Unix systems are available and some of them are commercial whereas the others are freely available. As a result, many people are becoming Unix/Linux enthusiasts especially in India. Hundreds of Books have been written in the past, which explores various facets of Unix. This book attempts to expose the reader to Linux installations and programming, and it is assumed that the reader has had some prior exposure to an operating system such as Windows, as well as C Programming.

  15. CAST with its micromegas detector installed.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    The CERN Axion Solar Telescope (CAST) uses a prototype LHC dipole magnet to search for very weakly interacting neutral particles called axions, which should originate in the core of the Sun. The magnet converts the solar axions to photons which are then detected by an X-ray detector based on Micromegas technology. CAST's Micromegas detector has now been installed. Photos 01 02: General view of the CAST experiment with the Micromegas detector in place. Photo 03: Close-up of the micromegas set-up.

  16. Centaur Rocket Installation in PSL #1

    Science.gov (United States)

    1962-01-01

    Centaur Rocket Installation in PSL - Propulsion Systems Laboratory #1. The RL-10 Rocket was developed by Pratt and Whitney in the late 1950's and tested at the Lewis Research Center (now known as the John H. Glenn Research Lewis Field). This power plant was the propulsion system for NASA's upper stage Centaur rocket and was significant for being the first to use liquid hydrogen and oxygen as fuel. The Centaur suffered a number of early failures, but later proved to be a very successful upper stage for numerous commercial, NASA and military payloads.

  17. Switchgear installations for extremely high voltages

    Energy Technology Data Exchange (ETDEWEB)

    Muller, M.; Stepinski, B.

    1964-01-01

    The methods by which 750-kV installations can be economically constructed are described. Besides the choice of phase distances and conductors, the possible layouts and circuitry are dealt with and illustrated by results obtained from the basic studies of 750-kV equipment. In conclusion, a comparison of costs is made, both for the individual components and for the overall financial outlay for the arrangements considered; the total and itemized costs of compounds for voltages of 245 to 750 kV according to the present state of the art are also discussed.

  18. Biological baseline data Youngs Bay, Oregon, 1974

    Energy Technology Data Exchange (ETDEWEB)

    McMechan, K.J. (ed.); Higley, D.L.; Holton, R.L.

    1975-04-01

    This report presents biological baseline information gathered during the research project, Physical, Chemical and Biological Studies on Youngs Bay.'' Youngs Bay is a shallow embayment located on the south shore of the Columbia River, near Astoria, Oregon. Research on Youngs Bay was motivated by the proposed construction by Alumax Pacific Aluminum Corporation of an aluminum reduction plant at Warrenton, Oregon. The research was designed to provide biological baseline information on Youngs Bay in anticipation of potential harmful effects from plant effluents. The information collected concerns the kinds of animals found in the Youngs Bay area, and their distribution and seasonal patterns of abundance. In addition, information was collected on the feeding habits of selected fish species, and on the life history and behavioral characteristics of the most abundant benthic amphipod, Corophium salmonis. Sampling was conducted at approximately three-week intervals, using commonly accepted methods of animal collection. Relatively few stations were sampled for fish, because of the need to standardize conditions of capture. Data on fish capture are reported in terms of catch-per-unit effort by a particular sampling gear at a specific station. Methods used in sampling invertebrates were generally more quantitative, and allowed sampling at a greater variety of places, as well as a valid basis for the computation of densities. Checklists of invertebrate species and fish species were developed from these samples, and are referred to throughout the report. The invertebrate checklist is more specific taxonomically than are tables reporting invertebrate densities. This is because the methods employed in identification were more precise than those used in counts. 9 refs., 27 figs., 25 tabs.

  19. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  20. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  1. Notes: Installation vs. Echelon Stock Policies for Multilevel Inventory Control

    OpenAIRE

    Sven Axsäter; Kaj Rosling

    1993-01-01

    This paper compares installation and echelon stock policies for multilevel inventory control. The major results are for serial and assembly systems. For (Q, r)-rules, echelon stock policies are, in general, superior to installation stock policies. A Kanban-policy is identified as a restricted type of installation stock (Q, r)-policy.

  2. 30 CFR 77.511 - Danger signs at electrical installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  3. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, Ferdy

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  4. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for operation of motor...

  5. 32 CFR 636.11 - Installation traffic codes

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In addition to the requirements in § 634.25(d) of this subchapter...

  6. 24 CFR 3285.907 - Manufacturer additions to installation instructions.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Manufacturer additions to... Optional Information for Manufacturer's Installation Instructions § 3285.907 Manufacturer additions to installation instructions. A manufacturer may include in its installation instructions items that are...

  7. 24 CFR 3285.2 - Manufacturer installation instructions.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Manufacturer installation... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer installation instructions. (a) Instructions required. A manufacturer must provide with each new...

  8. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  9. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  10. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605... Installation, maintenance, adjustment, and repair. (a) Only a person specifically licensed by the Commission or an Agreement State shall install, maintain, adjust, or repair a remote afterloader unit,...

  11. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, F.T.Y.

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  12. Zinc Bromide Flow Battery Installation for Islanding and Backup Power

    Science.gov (United States)

    2016-09-18

    75 Figure 5-41: Clouds forming in the southwestern sky ...sizing Renewable Energy (RE) generation in order to demonstrate progress towards reaching Net Zero operation; e.g. a Military installation that produces...will come from renewable sources. Power from Renewable Sources •By 2020, 50% of installations will be net -zero consumers.Net-zero installations

  13. 46 CFR 58.20-15 - Installation of refrigerating machinery.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation of refrigerating machinery. 58.20-15... AND AUXILIARY MACHINERY AND RELATED SYSTEMS Refrigeration Machinery § 58.20-15 Installation of refrigerating machinery. (a) Where refrigerating machines are installed in which anhydrous ammonia is used as...

  14. 14 CFR 23.1353 - Storage battery design and installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  15. 30 CFR 56.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial...

  16. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  17. Scheme for generation of highly monochromatic X-rays from a baseline XFEL undulator

    CERN Document Server

    Geloni, Gianluca; Saldin, Evgeni

    2010-01-01

    One goal of XFEL facilities is the production of narrow bandwidth X-ray radiation. The self-seeding scheme was proposed to obtain a bandwidth narrower than that achievable with conventional X-ray SASE FELs. A self-seeded FEL is composed of two undulators separated by a monochromator and an electron beam bypass that must compensate for the path delay of X-rays in the monochromator. This leads to a long bypass, with a length in the order of 40-60 m, which requires modifications of the baseline undulator configuration. As an attempt to get around this obstacle, together with a study of the self-seeding scheme for the European XFEL, here we propose a novel technique based on a pulse doubler concept. Using a crystal monochromator installed within a short magnetic chicane in the baseline undulator, it is possible to decrease the bandwidth of the radiation well beyond the XFEL design down to 10^(-5). The magnetic chicane can be installed without any perturbation of the XFEL focusing structure, and does not interfere...

  18. Zero Energy Housing for Military Installations

    Science.gov (United States)

    2013-07-01

    both the ZEH and the baseline homes was compared to the average energy use of the surrounding homes in the neighborhood , called the Woodlands. Water ...methods, buildings account for 54% of sulfur dioxide emissions, 17% of nitrous oxide emissions, and 40% of CO2 emissions (DOE, 2011). This project...inform future building designs, as to which design and operations strategies were most effective in reducing energy and water use, while maintaining

  19. District heating substations - design and installation

    Energy Technology Data Exchange (ETDEWEB)

    2004-12-15

    These technical regulations for district heating substations are sector-wide regulations for the Swedish district heating sector, describing the design, installation, use and maintenance of substations. If a district heating substation is to operate in the best possible way, the building's space heating and domestic hot water systems must comply with the requirements in these regulations and with those issued by public authorities. These regulations also describe aspects that must be considered when substations need to be replaced. The use then of correct values for the building energy requirements ensures that the new substation will be properly matched to its duties. These regulations are intended for use by: - those responsible for contacts between the district heating supplier and the customer. - those who own, operate and/or administer a building or facility that is heated by district heating. - those who design, manufacture, purchase, test or install substations. It is recommended that enquiries should refer to the Swedish District Heating Association's technical regulations when specifying requirements. The procurement criteria described in these regulations should be applied when evaluating tenders

  20. Assembling and Installing LRUs for NIF

    Energy Technology Data Exchange (ETDEWEB)

    Bonanno, R E

    2003-12-31

    Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

  1. Performance of Installed Cooking Exhaust Devices

    Energy Technology Data Exchange (ETDEWEB)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  2. An installation for vapor conversion of gases

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, I.; Tabata, K.

    1983-01-28

    An installation is proposed for converting a mixture of hydrocarbon gases with steam in the presence of nickel, platinum, lead and cobalt catalysts (Kt) on a carrier of Si0/sub 2/, A1/sub 2/0/sub 3/, Ti0/sub 2/ and so on. The reaction tower (RK1) for conversion is made of an inorganic, heat resistant ceramic material (for instance, A1/sub 2/0/sub 3/ ceramic), heaters are located inside the walls of the reaction tower, while on the outside the reaction conversion tower is equipped with an external tubular housing made of heat resistant materials or of inorganic heat resistant ceramic material. Here, there is a space between the external walls of the reaction conversion tower and the walls of the housing along the entire circumference of the reaction conversion tower which serves for preheating of the hydrocarbon gas and the steam before their input into the reaction conversion tower. The installation is designed for conversion of natural gas, C/sub 3/H/sub 8/ and other hydrocarbon gases and of liquid hydrocarbons (Uv) into synthesis gas. The design provides for even heating of the catalyst during reforming. The use of ceramic materials for the reaction conversion tower prevents sedimentation of coke on the walls of the reaction tower.

  3. GLoBES: General Long Baseline Experiment Simulator

    Science.gov (United States)

    Huber, Patrick; Kopp, Joachim; Lindner, Manfred; Rolinec, Mark; Winter, Walter

    2007-09-01

    GLoBES (General Long Baseline Experiment Simulator) is a flexible software package to simulate neutrino oscillation long baseline and reactor experiments. On the one hand, it contains a comprehensive abstract experiment definition language (AEDL), which allows to describe most classes of long baseline experiments at an abstract level. On the other hand, it provides a C-library to process the experiment information in order to obtain oscillation probabilities, rate vectors, and Δχ-values. Currently, GLoBES is available for GNU/Linux. Since the source code is included, the port to other operating systems is in principle possible. GLoBES is an open source code that has previously been described in Computer Physics Communications 167 (2005) 195 and in Ref. [7]). The source code and a comprehensive User Manual for GLoBES v3.0.8 is now available from the CPC Program Library as described in the Program Summary below. The home of GLobES is http://www.mpi-hd.mpg.de/~globes/. Program summaryProgram title: GLoBES version 3.0.8 Catalogue identifier: ADZI_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/ADZI_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing provisions: Standard CPC licence, http://cpc.cs.qub.ac.uk/licence/licence.html No. of lines in distributed program, including test data, etc.: 145 295 No. of bytes in distributed program, including test data, etc.: 1 811 892 Distribution format: tar.gz Programming language: C Computer: GLoBES builds and installs on 32bit and 64bit Linux systems Operating system: 32bit or 64bit Linux RAM: Typically a few MBs Classification: 11.1, 11.7, 11.10 External routines: GSL—The GNU Scientific Library, www.gnu.org/software/gsl/ Nature of problem: Neutrino oscillations are now established as the leading flavor transition mechanism for neutrinos. In a long history of many experiments, see, e.g., [1], two oscillation frequencies have been identified: The fast atmospheric

  4. Long-term Testing Results for the 2008 Installation of LED Luminaires at the I-35 West Bridge in Minneapolis

    Energy Technology Data Exchange (ETDEWEB)

    Kinzey, Bruce R.; Davis, Robert G.

    2014-09-30

    This document reports the long-term testing results from an extended GATEWAY project that was first reported in “Demonstration Assessment of Light-Emitting Diode (LED) Roadway Lighting at the I-35W Bridge, in Minneapolis, MN,” August 2009. That original report presented the results of lighting the newly reconstructed I 35W Bridge using LEDs in place of conventional high-pressure sodium (HPS) roadway luminaires, comparing energy use and illuminance levels with a simulated baseline condition. That installation was an early stage implementation of LED lighting and remains one of the oldest installations in continued operation today. This document provides an update of the LED system’s performance since its installation in September 2008.

  5. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Azoeuf, P.; Guillon, A. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  6. Arc melter demonstration baseline test results

    Energy Technology Data Exchange (ETDEWEB)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O`Connor, W.K.; Turner, P.C.

    1994-07-01

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process.

  7. The LOFAR long baseline snapshot calibrator survey

    CERN Document Server

    Moldón, J; Wucknitz, O; Jackson, N; Drabent, A; Carozzi, T; Conway, J; Kapińska, A D; McKean, P; Morabito, L; Varenius, E; Zarka, P; Anderson, J; Asgekar, A; Avruch, I M; Bell, M E; Bentum, M J; Bernardi, G; Best, P; Bîrzan, L; Bregman, J; Breitling, F; Broderick, J W; Brüggen, M; Butcher, H R; Carbone, D; Ciardi, B; de Gasperin, F; de Geus, E; Duscha, S; Eislöffel, J; Engels, D; Falcke, H; Fallows, R A; Fender, R; Ferrari, C; Frieswijk, W; Garrett, M A; Grießmeier, J; Gunst, A W; Hamaker, J P; Hassall, T E; Heald, G; Hoeft, M; Juette, E; Karastergiou, A; Kondratiev, V I; Kramer, M; Kuniyoshi, M; Kuper, G; Maat, P; Mann, G; Markoff, S; McFadden, R; McKay-Bukowski, D; Morganti, R; Munk, H; Norden, M J; Offringa, A R; Orru, E; Paas, H; Pandey-Pommier, M; Pizzo, R; Polatidis, A G; Reich, W; Röttgering, H; Rowlinson, A; Scaife, A M M; Schwarz, D; Sluman, J; Smirnov, O; Stappers, B W; Steinmetz, M; Tagger, M; Tang, Y; Tasse, C; Thoudam, S; Toribio, M C; Vermeulen, R; Vocks, C; van Weeren, R J; White, S; Wise, M W; Yatawatta, S; Zensus, A

    2014-01-01

    Aims. An efficient means of locating calibrator sources for International LOFAR is developed and used to determine the average density of usable calibrator sources on the sky for subarcsecond observations at 140 MHz. Methods. We used the multi-beaming capability of LOFAR to conduct a fast and computationally inexpensive survey with the full International LOFAR array. Sources were pre-selected on the basis of 325 MHz arcminute-scale flux density using existing catalogues. By observing 30 different sources in each of the 12 sets of pointings per hour, we were able to inspect 630 sources in two hours to determine if they possess a sufficiently bright compact component to be usable as LOFAR delay calibrators. Results. Over 40% of the observed sources are detected on multiple baselines between international stations and 86 are classified as satisfactory calibrators. We show that a flat low-frequency spectrum (from 74 to 325 MHz) is the best predictor of compactness at 140 MHz. We extrapolate from our sample to sho...

  8. Lorentz symmetry and very long baseline interferometry

    Science.gov (United States)

    Le Poncin-Lafitte, C.; Hees, A.; Lambert, S.

    2016-12-01

    Lorentz symmetry violations can be described by an effective field theory framework that contains both general relativity and the Standard Model of particle physics called the Standard Model extension (SME). Recently, postfit analysis of Gravity Probe B and binary pulsars led to an upper limit at the 10-4 level on the time-time coefficient s¯T T of the pure-gravity sector of the minimal SME. In this work, we derive the observable of very long baseline interferometry (VLBI) in SME and then implement it into a real data analysis code of geodetic VLBI observations. Analyzing all available observations recorded since 1979, we compare estimates of s¯T T and errors obtained with various analysis schemes, including global estimations over several time spans, and with various Sun elongation cutoff angles, and by analysis of radio source coordinate time series. We obtain a constraint on s¯ T T=(-5 ±8 )×10-5 , directly fitted to the observations and improving by a factor of 5 previous postfit analysis estimates.

  9. Gated integrator with signal baseline subtraction

    Science.gov (United States)

    Wang, Xucheng

    1996-01-01

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window.

  10. Gated integrator with signal baseline subtraction

    Energy Technology Data Exchange (ETDEWEB)

    Wang, X.

    1996-12-17

    An ultrafast, high precision gated integrator includes an opamp having differential inputs. A signal to be integrated is applied to one of the differential inputs through a first input network, and a signal indicative of the DC offset component of the signal to be integrated is applied to the other of the differential inputs through a second input network. A pair of electronic switches in the first and second input networks define an integrating period when they are closed. The first and second input networks are substantially symmetrically constructed of matched components so that error components introduced by the electronic switches appear symmetrically in both input circuits and, hence, are nullified by the common mode rejection of the integrating opamp. The signal indicative of the DC offset component is provided by a sample and hold circuit actuated as the integrating period begins. The symmetrical configuration of the integrating circuit improves accuracy and speed by balancing out common mode errors, by permitting the use of high speed switching elements and high speed opamps and by permitting the use of a small integrating time constant. The sample and hold circuit substantially eliminates the error caused by the input signal baseline offset during a single integrating window. 5 figs.

  11. Resetting predator baselines in coral reef ecosystems

    Science.gov (United States)

    Bradley, Darcy; Conklin, Eric; Papastamatiou, Yannis P.; McCauley, Douglas J.; Pollock, Kydd; Pollock, Amanda; Kendall, Bruce E.; Gaines, Steven D.; Caselle, Jennifer E.

    2017-01-01

    What did coral reef ecosystems look like before human impacts became pervasive? Early efforts to reconstruct baselines resulted in the controversial suggestion that pristine coral reefs have inverted trophic pyramids, with disproportionally large top predator biomass. The validity of the coral reef inverted trophic pyramid has been questioned, but until now, was not resolved empirically. We use data from an eight-year tag-recapture program with spatially explicit, capture-recapture models to re-examine the population size and density of a key top predator at Palmyra atoll, the same location that inspired the idea of inverted trophic biomass pyramids in coral reef ecosystems. Given that animal movement is suspected to have significantly biased early biomass estimates of highly mobile top predators, we focused our reassessment on the most mobile and most abundant predator at Palmyra, the grey reef shark (Carcharhinus amblyrhynchos). We estimated a density of 21.3 (95% CI 17.8, 24.7) grey reef sharks/km2, which is an order of magnitude lower than the estimates that suggested an inverted trophic pyramid. Our results indicate that the trophic structure of an unexploited reef fish community is not inverted, and that even healthy top predator populations may be considerably smaller, and more precarious, than previously thought. PMID:28220895

  12. Baseline air quality study at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Dave, M.J.; Charboneau, R.

    1980-10-01

    Air quality and meteorological data collected at Fermi National Accelerator Laboratory are presented. The data represent baseline values for the pre-construction phase of a proposed coal-gasification test facility. Air quality data were characterized through continuous monitoring of gaseous pollutants, collection of meteorological data, data acquisition and reduction, and collection and analysis of discrete atmospheric samples. Seven air quality parameters were monitored and recorded on a continuous real-time basis: sulfur dioxide, ozone, total hydrocarbons, nonreactive hydrocarbons, nitric oxide, nitrogen oxides, and carbon monoxide. A 20.9-m tower was erected near Argonne's mobile air monitoring laboratory, which was located immediately downwind of the proposed facility. The tower was instrumented at three levels to collect continuous meteorological data. Wind speed was monitored at three levels; wind direction, horizontal and vertical, at the top level; ambient temperature at the top level; and differential temperature between all three levels. All continuously-monitored parameters were digitized and recorded on magnetic tape. Appropriate software was prepared to reduce the data. Statistical summaries, grphical displays, and correlation studies also are presented.

  13. Camera Trajectory fromWide Baseline Images

    Science.gov (United States)

    Havlena, M.; Torii, A.; Pajdla, T.

    2008-09-01

    Camera trajectory estimation, which is closely related to the structure from motion computation, is one of the fundamental tasks in computer vision. Reliable camera trajectory estimation plays an important role in 3D reconstruction, self localization, and object recognition. There are essential issues for a reliable camera trajectory estimation, for instance, choice of the camera and its geometric projection model, camera calibration, image feature detection and description, and robust 3D structure computation. Most of approaches rely on classical perspective cameras because of the simplicity of their projection models and ease of their calibration. However, classical perspective cameras offer only a limited field of view, and thus occlusions and sharp camera turns may cause that consecutive frames look completely different when the baseline becomes longer. This makes the image feature matching very difficult (or impossible) and the camera trajectory estimation fails under such conditions. These problems can be avoided if omnidirectional cameras, e.g. a fish-eye lens convertor, are used. The hardware which we are using in practice is a combination of Nikon FC-E9 mounted via a mechanical adaptor onto a Kyocera Finecam M410R digital camera. Nikon FC-E9 is a megapixel omnidirectional addon convertor with 180° view angle which provides images of photographic quality. Kyocera Finecam M410R delivers 2272×1704 images at 3 frames per second. The resulting combination yields a circular view of diameter 1600 pixels in the image. Since consecutive frames of the omnidirectional camera often share a common region in 3D space, the image feature matching is often feasible. On the other hand, the calibration of these cameras is non-trivial and is crucial for the accuracy of the resulting 3D reconstruction. We calibrate omnidirectional cameras off-line using the state-of-the-art technique and Mičušík's two-parameter model, that links the radius of the image point r to the

  14. Lorentz symmetry and Very Long Baseline Interferometry

    CERN Document Server

    Poncin-Lafitte, C Le; lambert, S

    2016-01-01

    Lorentz symmetry violations can be described by an effective field theory framework that contains both General Relativity and the Standard Model of particle physics called the Standard-Model extension (SME). Recently, post-fit analysis of Gravity Probe B and binary pulsars lead to an upper limit at the $10^{-4}$ level on the time-time coefficient $\\bar s^{TT}$ of the pure-gravity sector of the minimal SME. In this work, we derive the observable of Very Long Baseline Interferometry (VLBI) in SME and then we implement it into a real data analysis code of geodetic VLBI observations. Analyzing all available observations recorded since 1979, we compare estimates of $\\bar s^{TT}$ and errors obtained with various analysis schemes, including global estimations over several time spans and with various Sun elongation cut-off angles, and with analysis of radio source coordinate time series. We obtain a constraint on $\\bar s^{TT}=(-5\\pm 8)\\times 10^{-5}$, directly fitted to the observations and improving by a factor 5 pr...

  15. Buffer protection in the installation phase

    Energy Technology Data Exchange (ETDEWEB)

    Wimelius, Hans (Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)); Pusch, Roland (Geodevelopment International AB, Lund (Sweden))

    2008-12-15

    The research and development of the design and construction of the SKB's repository for final disposal of spent reactor fuel is conducted along several paths ('lines'). Issues concerning the bedrock are dealt with in the 'rock line' and those related to buffer and backfill in deposition holes and tunnels are considered in the 'buffer line' and 'backfill line', respectively. These lines also deal with sub-activities that are coupled to several other lines. One of them includes development of techniques for protecting buffer blocks from moisture and water in the installation phase. Techniques and methods for placement and removal of the 'buffer protection sheet' are dealt with in the 'buffer line'. The removal is, however, considered as being part of the backfilling sequence. Since the performance of the sheet is of fundamental importance to the placement and function of the buffer it deserves particular attention. Thus, the removal of the rubber sheet that serves to protect the buffer blocks in the installation phase may be difficult and can cause significant problems that may require retrieval of already placed canister, buffer and backfill. These matters are in focus in the present report. Arrangements for protecting already placed buffer blocks from moist air and water have been tested in earlier large-scale experiments, i.e. the Prototype Repository project at Aespoe but the experience from them has called for more effective protection of the clay blocks as described in the present report. Focus is on the construction of foundation components at the bottom of the deposition holes required for establishing a tight seal between rock and buffer blocks, and on the protection sheet and arrangements for limiting water pressure on it. Special attention is paid to the drainage of the space between rock and protection sheet that is necessary for avoiding failure of the sheet and to systems for achieving

  16. Digital Offshore Cadastre (DOC) - Pacific83 - Baseline Tangent Lines

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains baseline tangent lines and bay closing lines in ESRI Arc/Info export and Arc/View shape file formats for the BOEM Pacific Region. Baseline...

  17. The effect of short-baseline neutrino oscillations on LBNE

    Energy Technology Data Exchange (ETDEWEB)

    Louis, William C. [Physics Division, Los Alamos National Laboratory, Los Alamos, NM 87545 (United States)

    2015-10-15

    Short-baseline neutrino oscillations can have a relatively big effect on long-baseline oscillations, due to the cross terms that arise from multiple mass scales. The existing short-baseline anomalies suggest that short-baseline oscillations can affect the ν{sub μ} → ν{sub e} appearance probabilities by up to 20-40%, depending on the values of the CP-violating parameters.

  18. The effect of short-baseline neutrino oscillations on LBNE

    Science.gov (United States)

    Louis, William C.

    2015-10-01

    Short-baseline neutrino oscillations can have a relatively big effect on long-baseline oscillations, due to the cross terms that arise from multiple mass scales. The existing short-baseline anomalies suggest that short-baseline oscillations can affect the νμ → νe appearance probabilities by up to 20-40%, depending on the values of the CP-violating parameters.

  19. Dark energy camera installation at CTIO: overview

    Science.gov (United States)

    Abbott, Timothy M.; Muñoz, Freddy; Walker, Alistair R.; Smith, Chris; Montane, Andrés.; Gregory, Brooke; Tighe, Roberto; Schurter, Patricio; van der Bliek, Nicole S.; Schumacher, German

    2012-09-01

    The Dark Energy Camera (DECam) has been installed on the V. M. Blanco telescope at Cerro Tololo Inter-American Observatory in Chile. This major upgrade to the facility has required numerous modifications to the telescope and improvements in observatory infrastructure. The telescope prime focus assembly has been entirely replaced, and the f/8 secondary change procedure radically changed. The heavier instrument means that telescope balance has been significantly modified. The telescope control system has been upgraded. NOAO has established a data transport system to efficiently move DECam's output to the NCSA for processing. The observatory has integrated the DECam highpressure, two-phase cryogenic cooling system into its operations and converted the Coudé room into an environmentally-controlled instrument handling facility incorporating a high quality cleanroom. New procedures to ensure the safety of personnel and equipment have been introduced.

  20. Safety installation for preventing pollution by pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Wittgenstein, G.F.

    1972-10-25

    A safety installation for preventing pollution by pipelines, particularly those used for transporting liquid hydrocarbons, is described. It is applicable to any pipeline, but particularly to underground or submarine pipelines, whether made of steel, plastics, or any other material. The 4 essential objects of the invention are to insure reliable prevention of pollution of the environment due to leakage of a hydrocarbon through cracks in the pipe; to evacuate the leakage flow without delay to a vessel; to signal almost instantaneously the existence of a leak; and to effect remote control of operations by which the dynamic pressure in the pipe is cancelled. Each equipped section consists of a fluid-type jacket of plastic material which surrounds the pipe, which at its ends is sealed off. It is these seals which delimit the sections. (7 claims)

  1. Safety Assessment in Installation of Precast Concrete

    Directory of Open Access Journals (Sweden)

    Yashrri S.N.

    2014-03-01

    Full Text Available This study was carried out to identify the safety aspects and the level of safety during the installation process in construction sites. A questionnaire survey and interviews were done to provide data on safety requirements in precast concrete construction. All of the interviews and the research questionnaire survey were conducted among contractors that are registered as class 1 to class 7 with the Construction Industry Development Board (CIDB and class A to class G with Pusat Khidmat Kontraktor (PKK in Penang. Returned questionnaires were analysed with the use of simple percentages and the Likert Scale analysis method to identify safety aspects of precast construction. The results indicate that the safety aspect implemented by companies involved in the precast construction process is at a good level in the safety aspect during bracing, propping, welding and grouting processes and at a very good level of safety in general aspects and safety aspects during lifting processes.

  2. Skin: an interactive hyperstereoscopic electro installation

    Science.gov (United States)

    Kostis, Helen-Nicole; Kooima, Robert; Kannenberg, John

    2007-02-01

    It is the uniqueness of Virtual Reality as a medium that calls for the creation of hybrid realities which blur the finite boundaries between physical and digital existence. Virtual Reality's distinguishing features as an artistic medium embody a distinct form of aesthetics: it is a stereoscopic, immersive, interactive, performative, dynamic, and experiential medium. A Virtual Reality art piece manifests in multiple ways. It can present itself as an interactive virtual archetype, exploring concepts rendered from different perspectives, and as an impetus to challenge the platform's capabilities, not only theoretically as an artistic practice, but also by calling for the instantiation of authoring tools for the development of virtual reality experiences. The paradigm presented in this paper is a Virtual Reality art piece, called skin, 2006, developed on Electro, which is an open-source cross-platform development environment. skin, 2006, is an interactive hypersteroscopic high-definition audiovisual installation that explores a dialogue between physical and digital senses of "touch".

  3. Designing performativity for mixed reality installations

    Directory of Open Access Journals (Sweden)

    Andrew Morrison

    2010-07-01

    Full Text Available This article takes up the concept of performativity prevalent in the humanities and applies it to the design of installation arts in mixed reality mode. Based on the design, development and public access to two specific works, the concept is related to a form of research by design. We argue that the concept of performativity may be further usefully employed in investigations (design and research, artistic and public into digital arts where complex intersections between concepts, technologies, dramaturgy, media and participant actions are in flux and together constitute the emergence and experience of a work. Theories of performativity are related to these two works in an argument that further suggests there is room in research by design to also include ‘performative design’. The article is the result of a wide-ranging interdisciplinary collaboration and aims to convey some sense of that in its reporting style, content and analysis.

  4. Installing met towers in marine environments

    Energy Technology Data Exchange (ETDEWEB)

    Hanberg, Jackie [DNV Canada (Canada)

    2011-07-01

    Onshore measurements are taken to supplement offshore wind resource measurement campaigns. To maximize the quality of the measured data, the conditions presented by marine environments must be well understood and mitigated. This paper discusses the several factors that need attention prior to installation of the met towers. The towers experience high corrosion from their exposure to moist, salt-laden, marine air. Careful instrumentation and material selection can prevent or decrease corrosion. Stainless or galvanized hardware and coating sensor terminals with petroleum jelly are both helpful. Soil in the marine environment has variable moisture levels and is extremely wet, which makes grounding systems and backfill enhancers necessary. Weather conditions in these environments also tend to be unpredictable; hence, towers should be strong enough to handle typical marine weather. In conclusion, successful marine wind resource assessment campaigns require environmental research, careful planning, and awareness of the specific issues.

  5. Photovoltaic energy systems: Design and installation

    Science.gov (United States)

    Buresch, M.

    The characteristics of solar radiation, the design of solar cells, and the installation of Si solar cell arrays for various applications are described. The discussion is limited to medium-scale photovoltaic systems, from 0.1-100 kW peak output, mounted in fixed flat plate modules, the simplest, most maintenance-free concept. Solar cell functioning principles are outlined, including the parasitic mechanisms which reduce cell efficiency. The magnitude, variations, and distribution of the global solar energy input are quantified. Consideration is given to series and parallel connected solar arrays, and to performance under a variable load. Array protection and failure detection are explored, as are integrated array power conditioning equipment comprising energy storage, voltage regulation, and ac to dc converters. Attention is also devoted to array mounting and matching solar cell systems to load.

  6. Design tool for hydronic building installations

    Energy Technology Data Exchange (ETDEWEB)

    Soethout, L. [TNO Building and Construction Research, Delft (Netherlands); Aerts, J. [ISSO, Rotterdam (Netherlands); Plokker, W. [VABI Association for Automation in Building and Installation Technology, Delft (Netherlands)

    2005-07-01

    Design flaws and faulty commissioning can create imbalances in heat transfer and distribution in buildings. The design of the hydronic side of HVAC installations in buildings is in practice often limited to only the full load situation. However, installations most frequently operate in part load situations. This paper discussed a method of designing hydronic circuits for heating which considered full load and part load scenarios. The model was then validated by a simulation tool. Both the tool and the method were based on a modular approach, starting with the heat demands required by the various functions and locations in the building. Common design problems were reviewed, and an overview of the process in designing, commissioning and using a hydronic system was presented. A modular design method for a hydronic system was presented, which enabled users to design the system so that all user modules can be controlled in a decoupled manner, guaranteeing the required full load. The software tool consisted of several parts: a main application for the user interface; and a central project database and information retrieval system. An analysis module monitored design behavior. A library of modules was available within the program, as well as a graphical interface. Based on the outcome of calculation results, users can make changes in design and then restart the evaluation. It was anticipated that the tool will be coupled to a building simulation tool which will allow for the calculation of the dynamic demands of a building and provide realistic part-load information. The algorithm for solving the non linear equations of pressure versus flow was discussed. Equations were solved on 2 levels, and the solving process consisted of several repeated steps. The analysis module consisted of an expert system containing several rules describing the desired behavior of hydronic systems. It was noted that the rules were derived from, and compliant with compliance standards. 11 refs

  7. 40 CFR 80.90 - Conventional gasoline baseline emissions determination.

    Science.gov (United States)

    2010-07-01

    ... gasoline baseline emissions determination. (a) Annual average baseline values. For any facility of a... gasoline volume of the facility, per § 80.91. (b) Baseline exhaust benzene emissions—simple model. (1) Simple model exhaust benzene emissions of conventional gasoline shall be determined using the following...

  8. 10 CFR 850.20 - Baseline beryllium inventory.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Baseline beryllium inventory. 850.20 Section 850.20 Energy... Baseline beryllium inventory. (a) The responsible employer must develop a baseline inventory of the... inventory, the responsible employer must: (1) Review current and historical records; (2) Interview...

  9. Report on nuclear installations safety and security control. Rapport sur le controle de la surete et de la securite des installations nucleaires. Surete des installations. Securite et information

    Energy Technology Data Exchange (ETDEWEB)

    Birraux, C.; Serusclat, F.

    1990-01-01

    This report of the parliamentary office for evaluation of scientific and technological choices bearing on the safety and security of nuclear installations is divided into 2 volumes bearing on: - Volume I: nuclear installations safety. - nuclear safety and international organizations. - works separation: Finland, Belgium and Federal Republic of Germany. - French organization. - Volume II: security and information. - French nuclear security. - Public information.

  10. Nonintrusive methodology for wellness baseline profiling

    Science.gov (United States)

    Chung, Danny Wen-Yaw; Tsai, Yuh-Show; Miaou, Shaou-Gang; Chang, Walter H.; Chang, Yaw-Jen; Chen, Shia-Chung; Hong, Y. Y.; Chyang, C. S.; Chang, Quan-Shong; Hsu, Hon-Yen; Hsu, James; Yao, Wei-Cheng; Hsu, Ming-Sin; Chen, Ming-Chung; Lee, Shi-Chen; Hsu, Charles; Miao, Lidan; Byrd, Kenny; Chouikha, Mohamed F.; Gu, Xin-Bin; Wang, Paul C.; Szu, Harold

    2007-04-01

    We develop an accumulatively effective and affordable set of smart pair devices to save the exuberant expenditure for the healthcare of aging population, which will not be sustainable when all the post-war baby boomers retire (78 millions will cost 1/5~1/4 GDP in US alone). To design an accessible test-bed for distributed points of homecare, we choose two exemplars of the set to demonstrate the possibility of translation of modern military and clinical know-how, because two exemplars share identically the noninvasive algorithm adapted to the Smart Sensor-pairs for the real world persistent surveillance. Currently, the standard diagnoses for malignant tumors and diabetes disorders are blood serum tests, X-ray CAT scan, and biopsy used sometime in the physical checkup by physicians as cohort-average wellness baselines. The loss of the quality of life in making second careers productive may be caused by the missing of timeliness for correct diagnoses and easier treatments, which contributes to the one quarter of human errors generating the lawsuits against physicians and hospitals, which further escalates the insurance cost and wasteful healthcare expenditure. Such a vicious cycle should be entirely eliminated by building an "individual diagnostic aids (IDA)," similar to the trend of personalized drug, developed from daily noninvasive intelligent databases of the "wellness baseline profiling (WBP)". Since our physiology state undulates diurnally, the Nyquist anti-aliasing theory dictates a minimum twice-a-day sampling of the WBP for the IDA, which must be made affordable by means of noninvasive, unsupervised and unbiased methodology at the convenience of homes. Thus, a pair of military infrared (IR) spectral cameras has been demonstrated for the noninvasive spectrogram ratio test of the spontaneously emitted thermal radiation from a normal human body at 37°C temperature. This invisible self-emission spreads from 3 microns to 12 microns of the radiation wavelengths

  11. 1993 baseline solid waste management system description

    Energy Technology Data Exchange (ETDEWEB)

    Armacost, L.L.; Fowler, R.A.; Konynenbelt, H.S.

    1994-02-01

    Pacific Northwest Laboratory has prepared this report under the direction of Westinghouse Hanford Company. The report provides an integrated description of the system planned for managing Hanford`s solid low-level waste, low-level mixed waste, transuranic waste, and transuranic mixed waste. The primary purpose of this document is to illustrate a collective view of the key functions planned at the Hanford Site to handle existing waste inventories, as well as solid wastes that will be generated in the future. By viewing this system as a whole rather than as individual projects, key facility interactions and requirements are identified and a better understanding of the overall system may be gained. The system is described so as to form a basis for modeling the system at various levels of detail. Model results provide insight into issues such as facility capacity requirements, alternative system operating strategies, and impacts of system changes (ie., startup dates). This description of the planned Hanford solid waste processing system: defines a baseline system configuration; identifies the entering waste streams to be managed within the system; identifies basic system functions and waste flows; and highlights system constraints. This system description will evolve and be revised as issues are resolved, planning decisions are made, additional data are collected, and assumptions are tested and changed. Out of necessity, this document will also be revised and updated so that a documented system description, which reflects current system planning, is always available for use by engineers and managers. It does not provide any results generated from the many alternatives that will be modeled in the course of analyzing solid waste disposal options; such results will be provided in separate documents.

  12. Topo-Iberia GPS network: installation complete

    Science.gov (United States)

    Khazaradze, G.

    2009-04-01

    As part of the project, titled "Geociencias en Iberia: Estudios integrados de topografía y evolución 4D: Topo-Iberia", we have established a network of 26 continuous GPS stations, covering the Spanish part of the Iberian Peninsula (22 stations) and Morocco (4 stations). A major objective behind the establishment of this array is to monitor millimeter level deformation of the crust due to the collision of African and Eurasian (including Iberian) tectonic plates. More specific goals of the project include the identification of the areas and/or specific seismic faults which exhibit higher deformation rates, which could imply an increased seismic hazard in these specific areas. The network has been designed as two X-shaped transects crossing the peninsula from NE to SW and NW to SE, with relatively coarse distribution of the stations, superimposed with denser coverage in the seismically active areas of the Betics, Pyrenees and Cantabrian chains. The majority of the built monuments consist of 1.5-1.8 m tall concrete pillars of 40 cm in diameter anchored to the bedrock using iron rebars. One station in Huesca was built according the UNAVCO's short drilled braced monument (SDBM) specifications. All the monuments were equipped with the SCIGN leveling mounts to ensure the precise antenna alignment and re-alignment in case of the antenna replacement, as well as, tamper resistance of the monument mark. In places were the snow accumulation was possible the antennas were covered with plastic radomes. The instrumentation used is Trimble NetRS dual-frequency receivers with choke-ring antennas. The communication is mainly via cellular telephone system. As of December 2008, the network installation has been competed and all the stations are fully operational. Here we report the milestones of the installation of the network and, as well as, present the first preliminary results of the analysis of the data. Besides the newly established Topo-Iberia CGPS stations, we have included

  13. Preventive medicine oversight of splash pads on military installations.

    Science.gov (United States)

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.

  14. Sustainability Indicators for the Army Installation Management Command

    Science.gov (United States)

    2011-03-01

    portal contains other Assistant Chief of Staff for Installation Management (ACSIM) systems.21 Cost and revenue information about Army installations...that could be used as a dashboard in the vein of the set of installation sustainability indicators described herein. The 86 conceptual metrics listed...Training usage and management actions for training and natural resources - Percent Acre-days available Goal 8 - Metrics: - Biological Oxygen

  15. Installation of the Canadian Muon Cargo Inspection System at CRL

    Science.gov (United States)

    2014-04-01

    Installation of the Canadian Muon Cargo Inspection System at CRL Prepared by: Guy Jonkmans Atomic Energy of Canada Limited Chalk River ON...INSTALLATION OF THE CANADIAN MUON CARGO INSPECTION SYSTEM AT CRL 153-30100-REPT-001 Revision 0 2013/02/19 UNRESTRICTED 2013/02/19 ILLIMITÉ 153...30100-REPT-001 2013/02/19 Report, General Installation of the Canadian Muon Cargo Inspection System at CRL Research and Development 153-30100

  16. Advanced Measuring (Instrumentation Methods for Nuclear Installations: A Review

    Directory of Open Access Journals (Sweden)

    Wang Qiu-kuan

    2012-01-01

    Full Text Available The nuclear technology has been widely used in the world. The research of measurement in nuclear installations involves many aspects, such as nuclear reactors, nuclear fuel cycle, safety and security, nuclear accident, after action, analysis, and environmental applications. In last decades, many advanced measuring devices and techniques have been widely applied in nuclear installations. This paper mainly introduces the development of the measuring (instrumentation methods for nuclear installations and the applications of these instruments and methods.

  17. Tilecal towards the Installation at Cruise Speed

    CERN Multimedia

    Miralles, Ll

    Over the last month the Tile Calorimeter has made a major step in its way towards its assembly in ATLAS. Late February the final EndCap supports were installed and the load (200 Tn) transferred from the assembly cradle to the supports. By mid-March, 32 Endcap modules, 50% of the total with a weight of 350 Tn were pre-assembled in bldg. 185 at CERN. At this stage the assembly is inside its geometrical envelope and the tooling and procedures have been developed. The ATLAS Tile Calorimeter is composed of 3 cylinders ("barrels") of steel, scintillating tiles and optical fibers, altogether about 12 m long, with an outer diameter of 8.4 m, inner diameter of 4.5 m and weighing about 2800 tons. The central cavity will contain the Liquid Argon cryostats, and the whole calorimetry system will measure the direction and energy of jets produced at the LHC, as well as the missing transverse energy, which - as everyone knows - is one of the telltale signals of new and exciting physics. Each of the three cylinders is divid...

  18. Minimal Technologies Application Project: Planning and installation

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Severinghaus, W.D.; Johnson, D.O.; Brent, J.J.

    1989-03-01

    Intensive and continuous tactical training during the last 35 years at the Hohenfels Training Area in West Germany has caused the loss of vegetative ground cover and has accelerated soil erosion rates, resulting in extensive environmental damage, safety hazards, and unrealistic training habitats. The objectives of this project are to develop and evaluate revegetation procedures for establishing adequate vegetative cover to control erosion at minimal costs and disruption to training activities. This project involved the development and installation of 12 revegetation procedures that combined four seedbed preparation methods and seeding options with three site-closure periods. In March 1987, the four seedbed preparation/seeding options and closure periods were selected, a study site design and location chosen, and specifications for the revegetation procedures developed. A German rehabilitation contractor attempted the specified seedbed preparation and seeding on the 13.5-ha site in June, but abnormally high rainfall, usually wet site conditions, and lack of adequate equipment prevented the contractor from completing six of the 12 planned procedures. Planning and execution of the project has nonetheless provided valuable information on the importance and use of soil analytical results, seed availability and cost data, contractor equipment requirements, and time required for planning future revegetation efforts. Continued monitoring of vegetative ground cover at the site for the next two years, combined with cost information, will provide necessary data to determine which of the six revegetation procedures is the most effective. These data will be used in planning future rehabilitation efforts on tactical training areas.

  19. AUTONOMOUS WIND POWER INSTALLATIONS AND SYSTEMS

    Directory of Open Access Journals (Sweden)

    Kvitko A. V.

    2015-10-01

    Full Text Available The article shows the main advantages and disadvantages of renewable energy sources. It is shown, that in general, the use of renewable energy in the world has acquired real momentum and stable growth trend. An interesting fact is that the greatest application was currently the most mutable and unstable form of energy - wind. The total global installed capacity of large wind turbines, according to various estimates, is approximately 20 GW. This is because the specific investment in wind power is lower than with most other forms of renewable energy. The article presents features of the design and operation of modern wind power stations. It is shown that when choosing wind power plants and stations we must take into account the following main parameters and factors: the average value of amount of electricity consumed by power consumers on a monthly basis; power generator; uptime in the absence wind or when weak wind. The study shows block-circuit solutions of different options of energy systems made using wind power plants. We have also disclosed prospects of development wind energy and considered the advantages and the features of the choice of the main functional units of wind power stations which will increase the effectiveness of predesign work on the creation of high-performance systems of electrosupply with combined power supply systems based on renewable energy sources

  20. Production Facility Prototype Blower Installation Report

    Energy Technology Data Exchange (ETDEWEB)

    Woloshun, Keith Albert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dale, Gregory E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dalmas, Dale Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero, Frank Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-28

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating.  Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere.  With the increased beam heating, the helium flow requirement increased so that a larger blower was need for a mass flow rate of 400 g/s at 2.76 MPa (400 psig).  An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing.  This report describes this blower/motor/ppressure vessel package and the status of the facility preparations.

  1. Child passenger safety: direction, selection, location, installation.

    Science.gov (United States)

    Agran, Phyllis F; Hoffman, Benjamin

    2008-09-01

    The most significant risk factor for death and serious injury in a car crash is the failure to use a size-appropriate restraint system. Providing accurate car safety seat anticipatory guidance to families is the standard of care. Guiding families on the best car seat for best protection can be done with the four messages, direction, selection, location, and refer, if needed, to community resources for correct installation. Addressing special issues that impact use of a car seat on each and every ride, including challenging behaviors and obesity, will transfer to many other situations. Data support a new recommendation that children stay rear-facing in size-appropriate car seats until they reach the highest weight and height allowed for rear-facing by the manufacturer of the convertible seat. Premature graduation to the next seat type/size/position increases risk of injury. A driver who is distracted by a cell phone, food, or something else, becomes a risk factor for a car crash. State laws may lag behind best practices. Advocacy for stronger laws, better enforcement, and best practices at the local, state, and national levels is a critical role for the pediatric professional community.

  2. Solid targetry at the TESLA Accelerator Installation

    Energy Technology Data Exchange (ETDEWEB)

    Comor, J.J. E-mail: jcomor@rt270.vin.bg.ac.yu; Dakovic, M.; Rajcevic, M.; Kosutic, D.; Spasic, M.; Vidovic, A.; Duricic, J.; Nedeljkovic, N

    2002-03-11

    According to the concept of the TESLA Accelerator Installation, the channel for production of radioisotopes has to routinely produce {sup 201}Tl, {sup 111}In, {sup 67}Ga, {sup 123}I and {sup 18}F, and a number of other radionuclides for experimental purposes. The production of {sup 123}I and {sup 18}F will be performed in dedicated, commercial target stations, while a versatile solid target irradiation system is designed for the routine and experimental production of all other radioisotopes. The solid target station is designed to accept targets for both the 7 deg. and 90 deg. irradiation geometry. The targets used for the routine production will be prepared by electroplating on a silver substrate. They can be irradiated with a 1.5 kW beam using the 7 deg. geometry. The cooling of these targets is enhanced by fins on the back of the silver substrate designed so that the highest temperature on the surface of the target does not exceed 110 deg. C. The irradiation procedures will conform to the GMP requirements for the production of radiopharmaceuticals. The irradiated targets will be transported directly into the appropriate hot cell for radiochemical processing. All cells will be equipped with a target dissolution unit for etching the irradiated, electroplated film. After decontamination and sufficient cooling down, these targets will be reused several times.

  3. Solid targetry at the TESLA Accelerator Installation

    CERN Document Server

    Comor, J J; Rajcevic, M; Kosutic, D; Spasic, M; Vidovic, A; Duricic, J; Nedeljkovic, N

    2002-01-01

    According to the concept of the TESLA Accelerator Installation, the channel for production of radioisotopes has to routinely produce sup 2 sup 0 sup 1 Tl, sup 1 sup 1 sup 1 In, sup 6 sup 7 Ga, sup 1 sup 2 sup 3 I and sup 1 sup 8 F, and a number of other radionuclides for experimental purposes. The production of sup 1 sup 2 sup 3 I and sup 1 sup 8 F will be performed in dedicated, commercial target stations, while a versatile solid target irradiation system is designed for the routine and experimental production of all other radioisotopes. The solid target station is designed to accept targets for both the 7 deg. and 90 deg. irradiation geometry. The targets used for the routine production will be prepared by electroplating on a silver substrate. They can be irradiated with a 1.5 kW beam using the 7 deg. geometry. The cooling of these targets is enhanced by fins on the back of the silver substrate designed so that the highest temperature on the surface of the target does not exceed 110 deg. C. The irradiation ...

  4. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...

  5. 14 CFR 23.929 - Engine installation ice protection.

    Science.gov (United States)

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and...

  6. IPPC installations in France and limit values of emission; Installations IPPC en France et valeurs limites d'emission

    Energy Technology Data Exchange (ETDEWEB)

    Soleille, S

    2004-07-15

    The IPPC directive of the 24 September 1996 asked for the main european industrial installations an authorization. This authorization fixes limit values for pollutant emissions. In France, the main industrial installations are controlled since many years in the framework of the regulation on classified installations for the environment protection (ICPE). This report compares the limit values of emissions for the national and prefectorial orders and for the IPPC directive. (A.L.B.)

  7. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  8. Installation package for a solar heating and hot water system

    Science.gov (United States)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  9. 46 CFR 182.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... installation. (a) The design of all exhaust systems must ensure minimum risk of injury to personnel. Protection... be used in bulkhead penetration glands for dry exhaust systems. A wet exhaust pipe may be welded to a... 46 Shipping 7 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 182.430 Section...

  10. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    Science.gov (United States)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  11. Progress Report 1 January 1983 - 31 December 1984. Computer Installation

    DEFF Research Database (Denmark)

    Risø National Laboratory, Roskilde

    This report describes selected parts of the activities at the Computer Installation of Risa National Laboratory in 1983 and 1984. Information given may be preliminary.......This report describes selected parts of the activities at the Computer Installation of Risa National Laboratory in 1983 and 1984. Information given may be preliminary....

  12. 33 CFR 183.550 - Fuel tanks: Installation.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Fuel tanks: Installation. 183.550...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Manufacturer Requirements § 183.550 Fuel tanks: Installation. (a) Each fuel tank must not be integral with any boat structure or mounted on an engine. (b)...

  13. The new installation at the Nijmegen High Field Magnet Laboratory

    NARCIS (Netherlands)

    Perenboom, J.A.A.J.; Wiegers, S.A.J.; Christianen, P.C.M.; Zeitler, U.; Maan, J.C.

    2004-01-01

    For research in the highest continuous and pulsed magnetic fields large, complex and powerful installations are needed. A new 20 MW installation has been built at the University of Nijmegen. The ultra-low ripple power converter, delivering 40 kA at up to 500 V, provides the capability to perform exp

  14. Targeting Net Zero Energy for Military Installations (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Burman, K.

    2012-05-01

    Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

  15. 24 CFR 3285.501 - Home installation manual supplements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Home installation manual supplements. 3285.501 Section 3285.501 Housing and Urban Development Regulations Relating to Housing and Urban... Home installation manual supplements. Supplemental instructions for optional equipment or features...

  16. 46 CFR 111.15-5 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... must be as close as possible to the engine or engines. (c) Small batteries. Small size battery... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery...

  17. Climate Change Impacts at Department of Defense Installations

    Science.gov (United States)

    2017-06-16

    ANL/EVS-17/9 Climate Change Impacts at Department of Defense Installations Environmental Science Division About...LLC. June 16, 2017 ANL/EVS-17/9 Climate Change Impacts at Department of Defense Installations prepared by Rao Kotamarthi...7 3.2 Use of Weather Data and Views on Climate Change among the DoD Site Contacts

  18. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine... drained by a device for automatic return of all drip to engine air intakes. (2) All gasoline engines...

  19. Framework for Modelling Multiple Input Complex Aggregations for Interactive Installations

    DEFF Research Database (Denmark)

    Padfield, Nicolas; Andreasen, Troels

    2012-01-01

    We describe a generalized framework as a method and design tool for creating interactive installations with a demand for exploratory meaning creation, not limited to the design stage, but extending into the stage where the installation meets participants and audience. The proposed solution is bas...

  20. Design and installation package for solar hot water system

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    This report contains the design and installation procedure for the Solar Engineering and Manufacturing Company's solar hot water system. Included are the system performance specifications, system design drawings, hazard analysis and other information necessary to evaluate the design and instal the system.

  1. 46 CFR 167.40-1 - Electrical installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise provided by law or regulation in this part, the electrical equipment may be considered acceptable if...

  2. 14 CFR 29.1353 - Electrical equipment and installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and...

  3. 14 CFR 25.1353 - Electrical equipment and installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must...

  4. 46 CFR 76.27-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of subchapter J (Electrical Engineering) of this chapter. (f) A framed chart or diagram shall be installed in... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The...

  5. Forecasting Climate-Induced Ecosystem Changes on Military Installations

    Science.gov (United States)

    James D. Westervelt; William W. Hargrove

    2011-01-01

    Military installation training lands must be managed to support species at risk as well as to be effective training environments for soldiers. Forecasts from various global climate change models suggest that the habitats associated with some military training installations will face pressures that induce biome-shifts, invasive species, loss of habitat, and changes in...

  6. Capability Planning for Today and Tomorrow Army Installation Status Report

    Science.gov (United States)

    2012-05-01

    Report – Provide data for IMCP metrics How are ISR-NI Data Utilized? Unclassified 9 of 22 Installation Status Report Michelle Fulton/(571)256...ol13 Measures (84.6%) ) Output ( IMCP ) ( IGI&S ) ( OSD-NIM ) (G3 SRR (FY10)) Unclassified 15 of 22 Installation Status Report Michelle Fulton

  7. Installation of Ceramic Tile: Residential Thin-Set Methods.

    Science.gov (United States)

    Short, Sam

    This curriculum guide contains materials for use in teaching a course on residential thin-set methods of tile installation. Covered in the individual units are the following topics: the tile industry; basic math; tools; measurement; safety in tile setting; installation materials and guidelines for their use; floors; counter tops and backsplashes;…

  8. 46 CFR 58.10-15 - Gas turbine installations.

    Science.gov (United States)

    2010-10-01

    ... harmful foreign material, including water, into the system. (2) A gas turbine air inlet must not be in a... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine...

  9. 30 CFR 77.1605 - Loading and haulage equipment; installations.

    Science.gov (United States)

    2010-07-01

    ... UNDERGROUND COAL MINES Loading and Haulage § 77.1605 Loading and haulage equipment; installations. (a) Cab... railroads shall be designed, installed, and maintained in a safe manner consistent with the speed and type... projection of moving railroad equipment shall be provided on at least one side of the tracks; all places...

  10. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    OpenAIRE

    Petru Chioncel; Cristian Paul Chioncel; Nicoleta Gillich

    2013-01-01

    This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  11. 14 CFR 27.1353 - Storage battery design and installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... result when the battery is recharged (after previous complete discharge)— (1) At maximum...

  12. 30 CFR 77.509 - Transformers; installation and guarding.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground,...

  13. 32 CFR 643.121 - Private organizations on DA installations.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Private organizations on DA installations. 643.121 Section 643.121 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY... DA installations. (a) AR 210-1 defines and classifies private organizations, such as thrift shops...

  14. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step......-by-step, detailed guide on how to pre-configure and install the machines and network. For more detailed description of the steps, a reader is advised to refer to another supplemental book named “Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment.” There are a few more details, accompanied...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...

  15. Installation of a modular building block photovoltaic concentrator array field

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, J.A.; Cass, D.C.; Broadbent, S.

    1985-06-01

    A building block array field nominally rated at 25 kW has been installed in Albuquerque, New Mexico. The building block is a single source electrical circuit of six center pedestal two-axis tracking arrays connected in parallel and having a nominal operating voltage of 420 volts DC. Each array contains 60 point-focusing Fresnel lens photovoltaic concentrator modules connected in series for a nominal power output of 4.2 kW per array. The structural design uses a center pedestal two-axis cantilevered support tube with a closed loop sun sensor electronic control system. A master control provides manual override of the array field. The installation was accomplished without difficulty and demonstrated the ease of turnkey building block installation. The costs of 1 MW size fields is estimated to be $6.99 per watt installed based on the building block installation.

  16. Risk information in support of cost estimates for the Baseline Environmental Management Report (BEMR). Section 1

    Energy Technology Data Exchange (ETDEWEB)

    Gelston, G.M.; Jarvis, M.F.; Warren, B.R. [Pacific Northwest Lab., Richland, WA (United States); Von Berg, R. [ICF Kaiser Engineers, Inc., Oakland, CA (United States)

    1995-06-01

    The Pacific Northwest Laboratory (PNL)(1) effort on the overall Baseline Environmental Management Report (BEMR) project consists of four installation-specific work components performed in succession. These components include (1) development of source terms, 92) collection of data and preparation of environmental settings reports, (3) calculation of unit risk factors, and (4) utilization of the unit risk factors in Automated Remedial Action Methodology (ARAM) for computation of target concentrations and cost estimates. This report documents work completed for the Nevada Test Site, Nevada, for components 2 and 3. The product of this phase of the BEMR project is the development of unit factors (i.e., unit transport factors, unit exposure factors, and unit risk factors). Thousands of these unit factors are gene rated and fill approximately one megabyte of computer information per installation. The final unit risk factors (URF) are transmitted electronically to BEMR-Cost task personnel as input to a computer program (ARAM). Abstracted files and exhibits of the URF information are included in this report. These visual formats are intended to provide a sample of the final task deliverable (the URF files) which can be easily read without a computer.

  17. Installation rules for low-voltage lightning arresters; Regles d'installation des parafoudres basse tension

    Energy Technology Data Exchange (ETDEWEB)

    Mignardot, D. [Schneider Electric, 38 - Grenoble (France)

    1998-06-01

    Following assessment of lightning risk and selection of a suitable lightning arrester for the installation, knowledge of good practice in arrester installation is crucial in obtaining genuinely effective protection. Major concepts here include earthing diagrams, building equipotentiality, lightning arrester cascade arrangements, and device disconnection and coordination plans. Understanding of these concepts is important in ensuring effective protection against overvoltages of atmospheric origin. (authors)

  18. High Bypass Ratio Jet Noise Reduction and Installation Effects Including Shielding Effectiveness

    Science.gov (United States)

    Thomas, Russell H.; Czech, Michael J.; Doty, Michael J.

    2013-01-01

    An experimental investigation was performed to study the propulsion airframe aeroacoustic installation effects of a separate flow jet nozzle with a Hybrid Wing Body aircraft configuration where the engine is installed above the wing. Prior understanding of the jet noise shielding effectiveness was extended to a bypass ratio ten application as a function of nozzle configuration, chevron type, axial spacing, and installation effects from additional airframe components. Chevron types included fan chevrons that are uniform circumferentially around the fan nozzle and T-fan type chevrons that are asymmetrical circumferentially. In isolated testing without a pylon, uniform chevrons compared to T-fan chevrons showed slightly more low frequency reduction offset by more high frequency increase. Phased array localization shows that at this bypass ratio chevrons still move peak jet noise source locations upstream but not to nearly the extent, as a function of frequency, as for lower bypass ratio jets. For baseline nozzles without chevrons, the basic pylon effect has been greatly reduced compared to that seen for lower bypass ratio jets. Compared to Tfan chevrons without a pylon, the combination with a standard pylon results in more high frequency noise increase and an overall higher noise level. Shielded by an airframe surface 2.17 fan diameters from nozzle to airframe trailing edge, the T-fan chevron nozzle can produce reductions in jet noise of as much as 8 dB at high frequencies and upstream angles. Noise reduction from shielding decreases with decreasing frequency and with increasing angle from the jet inlet. Beyond an angle of 130 degrees there is almost no noise reduction from shielding. Increasing chevron immersion more than what is already an aggressive design is not advantageous for noise reduction. The addition of airframe control surfaces, including vertical stabilizers and elevon deflection, showed only a small overall impact. Based on the test results, the best

  19. 77 FR 26535 - Hope Gas, Inc.; Notice of Baseline Filing

    Science.gov (United States)

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hope Gas, Inc.; Notice of Baseline Filing Take notice that on April 26, 2012, Hope Gas, Inc. (Hope Gas) submitted a baseline filing of their Statement of Operating Conditions...

  20. 77 FR 31841 - Hope Gas, Inc.; Notice of Baseline Filing

    Science.gov (United States)

    2012-05-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Hope Gas, Inc.; Notice of Baseline Filing Take notice that on May 16, 2012, Hope Gas, Inc. (Hope Gas) submitted a revised baseline filing of their Statement of...

  1. Adapting the M3 Surveillance Metrics for an Unknown Baseline

    Energy Technology Data Exchange (ETDEWEB)

    Hamada, Michael Scott [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Abes, Jeff I. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Jaramillo, Brandon Michael Lee [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-11-30

    The original M3 surveillance metrics assume that the baseline is known. In this article, adapted M3 metrics are presented when the baseline is not known and estimated by available data. Deciding on how much available data is enough is also discussed.

  2. 40 CFR 80.93 - Individual baseline submission and approval.

    Science.gov (United States)

    2010-07-01

    ...: (i) Refinery block flow diagram, showing principal refining units; (ii) Principal refining unit..., whether or not the auditor was retained through the baseline approval process. (ii) Identification of the... samples from batch processes, including volume of each batch sampled; and (G) Baseline fuel parameter...

  3. Digital Offshore Cadastre (DOC) - Pacific83 - Baseline Points

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains baseline points in ESRI Arc/Info export and Arc/View shape file formats for the BOEM Pacific Region. Baseline points are used by the BOEM to...

  4. Searching for neutrino oscillation parameters in long baseline experiments

    CERN Document Server

    Vihonen, Sampsa

    2016-01-01

    Developing neutrino astronomy requires a good understanding of the neutrino oscillations mechanism. The European strategy for neutrino oscillation physics sets a high priority on future long baseline neutrino experiments with the aim to measure the intrinsic parameters that govern the neutrino oscillations. In this work we take a look at the next generation of long baseline experiments and discuss their prospects in future research.

  5. Using Baseline Studies in the Investigation of Test Impact

    Science.gov (United States)

    Wall, Dianne; Horak, Tania

    2007-01-01

    The purpose of this article is to discuss the role of "baseline studies" in investigations of test impact and to illustrate the type of thinking underlying the design and implementation of such studies by reference to a recent study relating to a high-stakes test of English language proficiency. Baseline studies are used to describe an educational…

  6. The 2014 ALMA Long Baseline Campaign : An Overview

    NARCIS (Netherlands)

    ALMA Partnership, [Unknown; Fomalont, E. B.; Vlahakis, C.; Corder, S.; Remijan, A.; Barkats, D.; Lucas, R.; Hunter, T. R.; Brogan, C. L.; Asaki, Y.; Matsushita, S.; Dent, W. R. F.; Hills, R. E.; Phillips, N.; Richards, A. M. S.; Cox, P.; Amestica, R.; Broguiere, D.; Cotton, W.; Hales, A. S.; Hiriart, R.; Hirota, A.; Hodge, J. A.; Impellizzeri, C. M. V.; Kern, J.; Kneissl, R.; Liuzzo, E.; Marcelino, N.; Marson, R.; Mignano, A.; Nakanishi, K.; Nikolic, B.; Perez, J. E.; Pérez, L. M.; Toledo, I.; Aladro, R.; Butler, B.; Cortes, J.; Cortes, P.; Dhawan, V.; Di Francesco, J.; Espada, D.; Galarza, F.; Garcia-Appadoo, D.; Guzman-Ramirez, L.; Humphreys, E. M.; Jung, T.; Kameno, S.; Laing, R. A.; Leon, S.; Mangum, J.; Marconi, G.; Nagai, H.; Nyman, L.-A.; Radiszcz, M.; Rodón, J. A.; Sawada, T.; Takahashi, S.; Tilanus, R. P. J.; van Kempen, T.; Vila Vilaro, B.; Watson, L. C.; Wiklind, T.; Gueth, F.; Tatematsu, K.; Wootten, A.; Castro-Carrizo, A.; Chapillon, E.; Dumas, G.; de Gregorio-Monsalvo, I.; Francke, H.; Gallardo, J.; Garcia, J.; Gonzalez, S.; Hibbard, J. E.; Hill, T.; Kaminski, T.; Karim, A.; Krips, M.; Kurono, Y.; Lopez, C.; Martin, S.; Maud, L.; Morales, F.; Pietu, V.; Plarre, K.; Schieven, G.; Testi, L.; Videla, L.; Villard, E.; Whyborn, N.; Alves, F.; Andreani, P.; Avison, A.; Barta, M.; Bedosti, F.; Bendo, G. J.; Bertoldi, F.; Bethermin, M.; Biggs, A.; Boissier, J.; Brand, J.; Burkutean, S.; Casasola, V.; Conway, J.; Cortese, L.; Dabrowski, B.; Davis, T. A.; Diaz Trigo, M.; Fontani, F.; Franco-Hernandez, R.; Fuller, G.; Galvan Madrid, R.; Giannetti, A.; Ginsburg, A.; Graves, S. F.; Hatziminaoglou, E.; Hogerheijde, M.; Jachym, P.; Jimenez Serra, I.; Karlicky, M.; Klaasen, P.; Kraus, M.; Kunneriath, D.; Lagos, C.; Longmore, S.; Leurini, S.; Maercker, M.; Magnelli, B.; Marti Vidal, I.; Massardi, M.; Maury, A.; Muehle, S.; Muller, S.; Muxlow, T.; O’Gorman, E.; Paladino, R.; Petry, D.; Pineda, J.; Randall, S.; Richer, J. S.; Rossetti, A.; Rushton, A.; Rygl, K.; Sanchez Monge, A.; Schaaf, R.; Schilke, P.; Stanke, T.; Schmalzl, M.; Stoehr, F.; Urban, S.; van Kampen, E.; Vlemmings, W.; Wang, K.; Wild, W.; Yang, Y.; Iguchi, S.; Hasegawa, T.; Saito, M.; Inatani, J.; Mizuno, N.; Asayama, S.; Kosugi, G.; Morita, K.-I.; Chiba, K.; Kawashima, S.; Okumura, S. K.; Ohashi, N.; Ogasawara, R.; Sakamoto, S.; Noguchi, T.; Huang, Y.-D.; Liu, S.-Y.; Kemper, F.; Koch, P. M.; Chen, M.-T.; Chikada, Y.; Hiramatsu, M.; Iono, D.; Shimojo, M.; Komugi, S.; Kim, J.; Lyo, A.-R.; Muller, E.; Herrera, C.; Miura, R. E.; Ueda, J.; Chibueze, J.; Su, Y.-N.; Trejo-Cruz, A.; Wang, K.-S.; Kiuchi, H.; Ukita, N.; Sugimoto, M.; Kawabe, R.; Hayashi, M.; Miyama, S.; Ho, P. T. P.; Kaifu, N.; Ishiguro, M.; Beasley, A. J.; Bhatnagar, S.; Braatz, J. A., III; Brisbin, D. G.; Brunetti, N.; Carilli, C.; Crossley, J. H.; D’Addario, L.; Donovan Meyer, J. L.; Emerson, D. T.; Evans, A. S.; Fisher, P.; Golap, K.; Griffith, D. M.; Hale, A. E.; Halstead, D.; Hardy, E. J.; Hatz, M. C.; Holdaway, M.; Indebetouw, R.; Jewell, P. R.; Kepley, A. A.; Kim, D.-C.; Lacy, M. D.; Leroy, A. K.; Liszt, H. S.; Lonsdale, C. J.; Matthews, B.; McKinnon, M.; Mason, B. S.; Moellenbrock, G.; Moullet, A.; Myers, S. T.; Ott, J.; Peck, A. B.; Pisano, J.; Radford, S. J. E.; Randolph, W. T.; Rao Venkata, U.; Rawlings, M. G.; Rosen, R.; Schnee, S. L.; Scott, K. S.; Sharp, N. K.; Sheth, K.; Simon, R. S.; Tsutsumi, T.; Wood, S. J.

    2015-01-01

    A major goal of the Atacama Large Millimeter/submillimeter Array (ALMA) is to make accurate images with resolutions of tens of milliarcseconds, which at submillimeter (submm) wavelengths requires baselines up to ∼15 km. To develop and test this capability, a Long Baseline Campaign (LBC) was carried

  7. An Evaluation of Installation Methods for STS-1 Seismometers

    Science.gov (United States)

    Holcomb, L. Gary; Hutt, Charles R.

    1992-01-01

    INTRODUCTION This report documents the results of a series of experiments conducted by the authors at the Albuquerque Seismological Laboratory (ASl) during the spring and summer of 1991; the object of these experiments was to obtain and document quantitative performance comparisons of three methods of installing STS-1 seismometers. Historically, ASL has installed STS-1 sensors by cementing their thick glass base plates to the concrete floor of the vault (see Peterson and Tilgner, 1985, p 44 and Figure 31, p 51 for the details of this installation technique). This installation technique proved to be fairly satisfactory for the China Digital Seismic Network and for several sets of STS-1 sensors installed in other locations since that time. However, the cementing operation is rather labor intensive and the concrete requires a lengthy (about 1 week) curing time during which the sensor installed on it is noisy. In addition it is difficult to assure that all air bubbles have been removed from the interface between the cement and the glass base plate. If air bubbles are present beneath the plate, horizontal sensors can be unacceptably noisy. Moving a sensor installed in this manner requires the purchase of a new glass base plate because the old plate normally can not be removed without breakage. Therefore, this study was undertaken with the aim of developing an improved method of installing STS-1's. The goals were to develop a method which requires less field site labor during the installation and assures a higher quality installation when finished. In addition, the improved installation technique should promote portability. Two alternate installation techniques were evaluated in this study. One method replaces the cement between the base plate and the vault floor with sand. This method has been used in the French Geoscope program and in several IRIS/IDA installations made by the University of California at San Diego (UCSD) and possibly others. It is easily implemented in

  8. Esophageal impedance baseline according to different time intervals

    Directory of Open Access Journals (Sweden)

    Ummarino Dario

    2012-06-01

    Full Text Available Abstract Background The impedance baseline has been shown to reflect esophageal integrity, and to be decreased in patients with esophagitis. However, different methods for the determination of the impedance baseline have not been compared. Methods The median impedance baseline was calculated in 10 consecutive multichannel intraluminal impedance recordings in children with non-erosive reflux disease. All children underwent an endoscopy with a biopsy as part of the clinical work-up to exclude esophagitis. The impedance baseline was obtained both by including and excluding all impedance episodes (IE; reflux, swallows and gas episodes during the full recording, and during the first 1-minute period without an IE every hour (method 1, every 2 hours (method 2 or every 4 hours (method 3. The impedance baseline obtained during the full recording was set at 100%, and the variation (difference in impedance baseline for the different methods and variability (difference in impedance baseline during one analysis period were assessed. Results None of the participants had esophagitis. The mean difference over the six channels between the impedance baseline over the total recording with and without IE was approximately 2.5%, and comparable for each channel (range 0.47% to 5.55%. A mean of 1,028 IEs were excluded in each tracing, and it took between 4 and 24 hours to delete all events in one tracing. The difference in the impedance baseline obtained with and without IEs was mainly caused by the gas episodes in the upper channels and swallows in the lower channels. The median impedance baseline according to the three one-minute analysis methods was comparable to the median impedance baseline according to the 24 hour analysis. Conclusions The automatic determination of the median impedance baseline over the total tracing including IEs is an adequate method. In isolated tracings with numerous IEs, the calculation of the median impedance baseline over one minute

  9. Establishing a store baseline during interim storage of waste packages and a review of potential technologies for base-lining

    Energy Technology Data Exchange (ETDEWEB)

    McTeer, Jennifer; Morris, Jenny; Wickham, Stephen [Galson Sciences Ltd. Oakham, Rutland (United Kingdom); Bolton, Gary [National Nuclear Laboratory Risley, Warrington (United Kingdom); McKinney, James; Morris, Darrell [Nuclear Decommissioning Authority Moor Row, Cumbria (United Kingdom); Angus, Mike [National Nuclear Laboratory Risley, Warrington (United Kingdom); Cann, Gavin; Binks, Tracey [National Nuclear Laboratory Sellafield (United Kingdom)

    2013-07-01

    Interim storage is an essential component of the waste management lifecycle, providing a safe, secure environment for waste packages awaiting final disposal. In order to be able to monitor and detect change or degradation of the waste packages, storage building or equipment, it is necessary to know the original condition of these components (the 'waste storage system'). This paper presents an approach to establishing the baseline for a waste-storage system, and provides guidance on the selection and implementation of potential base-lining technologies. The approach is made up of two sections; assessment of base-lining needs and definition of base-lining approach. During the assessment of base-lining needs a review of available monitoring data and store/package records should be undertaken (if the store is operational). Evolutionary processes (affecting safety functions), and their corresponding indicators, that can be measured to provide a baseline for the waste-storage system should then be identified in order for the most suitable indicators to be selected for base-lining. In defining the approach, identification of opportunities to collect data and constraints is undertaken before selecting the techniques for base-lining and developing a base-lining plan. Base-lining data may be used to establish that the state of the packages is consistent with the waste acceptance criteria for the storage facility and to support the interpretation of monitoring and inspection data collected during store operations. Opportunities and constraints are identified for different store and package types. Technologies that could potentially be used to measure baseline indicators are also reviewed. (authors)

  10. Analysis of antenna position measurements and weather station network data during the ALMA Long Baseline Campaign of 2015

    CERN Document Server

    Hunter, Todd R; Broguiere, Dominique; Fomalont, Ed B; Dent, William R F; Phillips, Neil; Rabanus, David; Vlahakis, Catherine

    2016-01-01

    In a radio interferometer, the determination of geometrical antenna positions relies on accurate calibration of the dry and wet delay of the atmosphere above each antenna. For the Atacama Large Millimeter/Submillimeter Array (ALMA), which has baseline lengths up to 16 kilometers, the geography of the site forces the height above mean sea level of the more distant antenna pads to be significantly lower than the central array. Thus, both the ground level meteorological values and the total water column can be quite different between antennas in the extended configurations. During 2015, a network of six additional weather stations was installed to monitor pressure, temperature, relative humidity and wind velocity, in order to test whether inclusion of these parameters could improve the repeatability of antenna position determinations in these configurations. We present an analysis of the data obtained during the ALMA Long Baseline Campaign of Oct. through Nov. 2015. The repeatability of antenna position measurem...

  11. Control of the amplification process in baseline XFEL undulator with mechanical SASE switchers

    CERN Document Server

    Geloni, Gianluca; Saldin, Evgeni

    2010-01-01

    The magnetic gap of the baseline XFEL undulators can be varied mechanically for wavelength tuning. In particular, the wavelength range 0.1 nm - 0.4 nm can be covered by operating the European XFEL with the SASE2 undulator. The length of the SASE2 undulator (256.2 m) is sufficient to independently generate three pulses of different radiation wavelengths at saturation. Normally, if a SASE FEL operates in saturation, the quality of the electron beam is too bad for generation of SASE radiation in the subsequent part of undulator which is resonant at a few times longer wavelength. The new method of SASE undulator-switching based on the rapid switching of the FEL amplification process proposed in this paper is an attempt to get around this obstacle. Using mechanical SASE shutters installed within short magnetic chicanes in the baseline undulator, it is possible to rapidly switch the FEL photon beam from one wavelength to another, providing simultaneous multi-color capability. Combining this method with a photon-bea...

  12. Installation management for the European XFEL main accelerator

    Science.gov (United States)

    Bousonville, M.; Eints, F.; Choroba, S.

    2017-07-01

    By end of 2016, the main accelerator of the European XFEL was completed. To build this complex machine in a minimum of time, certain management methods were introduced in mid 2015, which accelerated the installation process substantially. In the following 64 weeks additional 84 % of the main accelerator were set up. This was possible due to an improved planning, the reinforcement of two teams as well as a permanent controlling and optimizing of the installation process. In this paper, the installation process from July 2015 to end 2016 and the measures, which speeded up the workflow, are described.

  13. Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station

    Science.gov (United States)

    Scheidegger, Brianne T.; Lively, Michael L.

    2012-01-01

    This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.

  14. Self and world: large scale installations at science museums.

    Science.gov (United States)

    Shimojo, Shinsuke

    2008-01-01

    This paper describes three examples of illusion installation in a science museum environment from the author's collaboration with the artist and architect. The installations amplify the illusory effects, such as vection (visually-induced sensation of self motion) and motion-induced blindness, to emphasize that perception is not just to obtain structure and features of objects, but rather to grasp the dynamic relationship between the self and the world. Scaling up the size and utilizing the live human body turned out to be keys for installations with higher emotional impact.

  15. The MINK methodology: background and baseline. [USA - Midwest Region

    Energy Technology Data Exchange (ETDEWEB)

    Rosenberg, N.J.; Crosson, P.R.; Frederick, K.D.; Easterling, W.E. III; McKenney, M.S.; Bowes, M.D.; Sedjo, R.A.; Darmstadter, J.; Katz, L.A.; Lemon, K.M. (Resources for the Future, Washington, DC (United States))

    1993-06-01

    A four step methodology has been developed for study of the regional impacts of climate change and the possible responses thereto. First the region's climate sensitive sectors and total economy are described (Task A, current baseline). Next a scenario of climate change is imposed on the current baseline (Task B, current baseline with climate change). A new baseline describing the climate sensitive sectors and total regional economy is projected for some time in the future (Task C, future baseline, year 2030) in the absence of climate change. Finally, the climate change scenario is reimposed on the future baseline (Task D, future baseline with climate change). Impacts of the climate change scenario on the current and future regional economies are determined by means of simulation models and other appropriate techniques. These techniques are also used to assess the impacts of an elevated CO[sub 2] concentration (450 ppm) and of various forms of adjustments and adaptations. The region chosen for the first test of the methodology is composed of the four U.S. states of Missouri, Iowa, Nebraska and Kansas. The climate change scenario is the actual weather of the 1930s decade in the MINK region. 'Current' climate is the actual weather of the period 1951-1980. 20 refs., 3 figs., 2 tabs.

  16. Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

  17. Radionuclide monitoring in molluscs inhabiting intertidal region near a nuclear installation, Gulf of Mannar, India.

    Science.gov (United States)

    Khan, M Feroz; Wesley, S Godwin

    2012-02-01

    Protection of non-human biota from ionizing contaminants, especially in the vicinity of nuclear installations is a very important aspect for nuclear engineers and ecologists. In this view, a baseline data on the activity concentration of (210)Po and (210)Pb were quantified in different tissues of molluscs inhabiting the intertidal region along the coast of Kudankulam. The activity concentration was noticed higher in the organs associated with digestion and metabolism. Filter feeding bivalve molluscs registered the maximum activity of (210)Po in their whole body compared to grazing gastropods. (210)Po:(210)Pb ratio was calculated to be greater than unity in most of the analysed tissues. The ecological sensitivity of molluscs to the radiation exposure and the safeness of the environment was analysed by calculating the external and internal dose rate. The hazard quotient for molluscs was lesser than the global bench mark dose rate of 10 μGyh(-1).

  18. Trinocular Stereo Matching Based on Correlations Between Baselines and Disparities

    Institute of Scientific and Technical Information of China (English)

    GUANYepeng; GUWeikang

    2004-01-01

    Gray correlation technique is utilized to take the multi-peak feature points with gray correlation coefficients less than a certain range of maximal correlation coefficient as a potential candidate matching set. There exists the maximal correlation between the correct disparities and their corresponding baselines. A trinocular stereo matching algorithm is proposed based on correlations between the baselines and disparities. After computing the correlations between the baselines and disparities, the unique matches can be determined by maximal correlation coefficient. It is proved that the algorithm proposed is valid and credible by 3-D reconstruction on two pairs of actual natural stereo images.

  19. Neutrino oscillations: what is magic about the "magic" baseline?

    CERN Document Server

    Smirnov, A Yu

    2006-01-01

    Physics interpretation of the ``magic'' baseline that can play important role in future oscillation experiments is given. The ``magic'' baseline coincides with the refraction length, $l_0$. The latter, in turn, approximately equals the oscillation length in matter at high energies. Therefore at the baseline $L = l_0$ the oscillation phase is $2\\pi$, and consequently, the ``solar'' amplitude of oscillations driven by the mixing angle $\\theta_{12}$ and mass splitting $\\Delta m^2_{21}$ vanishes. As a result, in the lowest order (i) the interference of amplitudes in the $\

  20. Dynamic baseline detection method for power data network service

    Science.gov (United States)

    Chen, Wei

    2017-08-01

    This paper proposes a dynamic baseline Traffic detection Method which is based on the historical traffic data for the Power data network. The method uses Cisco's NetFlow acquisition tool to collect the original historical traffic data from network element at fixed intervals. This method uses three dimensions information including the communication port, time, traffic (number of bytes or number of packets) t. By filtering, removing the deviation value, calculating the dynamic baseline value, comparing the actual value with the baseline value, the method can detect whether the current network traffic is abnormal.

  1. DF-224 Version 7.3 FS Installation

    Science.gov (United States)

    Boyce, Leslye

    1990-12-01

    Version 7.3 will implement a three logical memory unit contingency plan. It removes under utilized DF-224 code to recover memory margins and restructures code. The installation of DF-224, version 7.3 will be broken into a Installation, Regression test, and Contingency Back-out time. In addition, it eliminates the 10 and 300 second processing rate. It is highly desirable to implement the version of the flight software ASAP. Due to the complexity of the installation, dedicated spacecraft time is required to minimize spacecraft risk In summary, this proposal requests 14 orbits of dedicated spacecraft time for installation, regression test, and contingency back_out time for DF-224 FS V7.3 to be scheduled in the first few days of SMS 054.

  2. 30 CFR 77.704-5 - Installation of protective equipment.

    Science.gov (United States)

    2010-07-01

    ... high-voltage surface lines is begun, protective equipment shall be used to cover all bare conductors.... Such protective equipment shall be installed from a safe position below the conductors or...

  3. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  4. Progress of the Electrical Installation Work for LHC

    CERN Document Server

    Pedersen, J

    2001-01-01

    During the year 2000 the ST-EL group has performed a number of electrical installations within the LHC project. The 18 kV substation of zone 18 has been entirely renovated and the installations in the SD, SMA and SHM buildings terminated. In access point 5 the SX, SY, SH and SF buildings are either completed or have seen the installation advance according to schedule. The preparations for the injection tunnels and the buildings BA 4 and BA 7 have continued. The study work for the LHC general service is progressing well, supported by a study office, staffed by contracted personnel. The possibilities for an ST-EL support for the cabling of the experiments is currently being investigated by a joint EST - ST working group. A new activity to be taken over by the group is the optical fibre installation. The specialist team from SL joined the group the first of January 2001 and is presently settling in ST .

  5. Gargamelle installed in the neutrino beam in the West Area

    CERN Multimedia

    1976-01-01

    This photo shows the support on which shielding weighting 180 tons is installed, 6 metres above ground. Eight proportional chambers were later hung on each side of it. The expansion system can also be seen.

  6. 46 CFR 76.35-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of subchapter J (Electrical Engineering) of this chapter. (e) A framed chart or diagram shall be installed...

  7. Bridging interpersonal installation art with tangible business modeling

    DEFF Research Database (Denmark)

    Mitchell, Robb

    2012-01-01

    This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction....

  8. Development of cryogenic installations for large liquid argon neutrino detectors

    CERN Document Server

    Adamowski, M; Geynisman, M; Hentschel, S; Montanari, D; Nessi, M; Norris, B

    2015-01-01

    A proposal for a very large liquid argon (68,000 kg) based neutrino detector is being studied. To validate the design principles and the detector technology, and to gain experience in the development of the cryostats and the cryogenic systems needed for such large experiments, several smaller scale installations will be developed and implemented, at Fermilab and CERN. The cryogenic systems for these installations will be developed, constructed, installed and commissioned by an international engineering team. These installations shall bring the required cooling power under specific conditions to the experiments for the initial cool-down and the long term operation, and shall also guarantee the correct distribution of the cooling power within the cryostats to ensure a homogeneous temperature distribution within the cryostat itself. The cryogenic systems shall also include gaseous and liquid phase argon purification devices to be used to reach and maintain the very stringent purity requirements needed for these...

  9. Installation errors in calculating large-panel buildings (rus

    Directory of Open Access Journals (Sweden)

    Nedviga E.S.

    2011-10-01

    Full Text Available Every year the problem of civil and erection work quality gets sharper in Russia. The article is devoted to solving the identified problem not from the point of organizational and technological aspects of building but from the point of design and calculation. The paper considers the influence of offsetting and axes fractures of wall panels in the process of its installation into large-panel building. Comparative analysis of design schemes that takes into account different types of errors in installation is done. The structure calculation taking into account errors of details installation was made. Obtained efforts in structural elements exceeded allowable values prescribed in the standard documentation. Conclusions about need to consider installation errors (caused by a deviation from the design of vertical structures in design model were made, including calculation in the CAD software.

  10. Financial Responsibility and Installer Certification - 2005 Energy Policy Act

    Science.gov (United States)

    Grant guidelines to implement the financial responsibility and installer certification provision in Section 9003(i) of the Solid Waste Disposal Act, enacted by the Underground Storage Tank Compliance Act, part of the Energy Policy Act of 2005.

  11. Installation package for a solar-heating system

    Science.gov (United States)

    1980-01-01

    Package consists of installation, operation and maintenance manuals for four commercial solar energy subsystems, including flat plate solar collector pebble bed thermal-storage. Manual gives design information, sizing data, specification drawings, and other material for subsystem.

  12. Ceremony to mark the installation of first magnet at LEP

    CERN Multimedia

    CERN Audiovisual Team

    1987-01-01

    Speech from French Prime Minister Jacques Chirac following the installation of the first magnet at LEP on 4 June 1987. And from Herwig Schopper, CERN Director-General; Swiss President Pierre Aubert and Wolfgang Kummer, President of the CERN Council.

  13. Installation of optical shieldwire on existing transmission lines

    Energy Technology Data Exchange (ETDEWEB)

    Trausch, S. (Fluor Daniel, Chicago, IL (US))

    1988-01-01

    The author reports the development of a communication network between Minneapolis and Chicago. The fiber optics cable was installed, with a few exceptions, on existing transmission lines. Most of the utilized transmission structures are 138-161 kV wood pole H-frame structures with two shield wires. One of the shield wires was removed and replaced by the fiber optic cable. In a 30-mile section the fiber optic cable was installed on 345 kV lines supported on steel poles and steel lattice towers. Generally, however, 345 kV lines were avoided because it was difficult to obtain outages for the installation of the optic ground wire (OPGW). In some cases, where existing transmission line structures could not be used, the fiber optic cable was installed on 30- to 50-foot single wood pole structures designed to support this cable.

  14. Offshore Renewable Energy Installations: Impact on Navigation and Marine Safety

    Science.gov (United States)

    2011-01-01

    To reduce our dependence on foreign energy supplies, alternative or renewable energy sources are being pursued. These sources exploit a wide range of...technologies: solar photovoltaics or power plants; hydroelectricity (dams); ocean thermal energy conversion facilities; and offshore renewable energy installations...to affect marine navigation and safety, and although no offshore renewable energy installations presently exist in U.S. waters, several are

  15. Installation Management Transformation -- Promise, Impact and Contemporary Challenges

    Science.gov (United States)

    2012-03-12

    IMCOM provides ‗The Army‘s Home ‘ to thousands of men and women in uniform and the families that support them. Our mission is to provide the Army with...11 More specifically, Army leaders suggested transformed installations would support expeditionary formations while at home and while deployed...capture and use of rainwater and 3) treatment of wastewater with subsequent return to the aquifer. Fort Huachuca is one installation that has achieved

  16. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    Directory of Open Access Journals (Sweden)

    Petru Chioncel

    2013-01-01

    Full Text Available This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  17. A Framework to Survey the Energy Efficiency of Installed Motor Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rao, Prakash; Hasanbeigi, Ali; McKane, Aimee

    2013-08-01

    While motors are ubiquitous throughout the globe, there is insufficient data to properly assess their level of energy efficiency across regional boundaries. Furthermore, many of the existing data sets focus on motor efficiency and neglect the connected drive and system. Without a comprehensive survey of the installed motor system base, a baseline energy efficiency of a country or region’s motor systems cannot be developed. The lack of data impedes government agencies, utilities, manufacturers, distributers, and energy managers when identifying where to invest resources to capture potential energy savings, creating programs aimed at reducing electrical energy consumption, or quantifying the impacts of such programs. This paper will outline a data collection framework for use when conducting a survey under a variety of execution models to characterize motor system energy efficiency within a country or region. The framework is intended to standardize the data collected ensuring consistency across independently conducted surveys. Consistency allows for the surveys to be leveraged against each other enabling comparisons to motor system energy efficiencies from other regions. In creating the framework, an analysis of various motor driven systems, including compressed air, pumping, and fan systems, was conducted and relevant parameters characterizing the efficiency of these systems were identified. A database using the framework will enable policymakers and industry to better assess the improvement potential of their installed motor system base particularly with respect to other regions, assisting in efforts to promote improvements to the energy efficiency of motor driven systems.

  18. Evaluation of Cable Harness Post-Installation Testing. Part B

    Science.gov (United States)

    King, M. S.; Iannello, C. J.

    2011-01-01

    The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

  19. Development of a quality management system for Brazilian nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), Sao Paulo, SP (Brazil). Dept. da Qualidade]. E-mail: edkibrit@yahoo.com.br; Zouain, Desiree Moraes [Instituto de Pesquisas Energeticas e Nucleares (IPEN), Sao Paulo, SP (Brazil). Div. de Planejamento e Inovacao Tecnologica]. E-mail: dmzouain@ipen.br

    2005-07-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  20. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  1. Baseline inventory data recommendations for National Wildlife Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Baseline Inventory Team recommends that each refuge have available abiotic “data layers” for topography, aerial photography, hydrography, soils, boundaries, and...

  2. Baseline Biomarkers for Outcome of Melanoma Patients Treated with Pembrolizumab

    NARCIS (Netherlands)

    Weide, Benjamin; Martens, Alexander; Hassel, Jessica C.; Berking, Carola; Postow, Michael A.; Bisschop, Kees; Simeone, Ester; Mangana, Johanna; Schilling, Bastian; Di Giacomo, Anna Maria; Brenner, Nicole; Kaehler, Katharina; Heinzerling, Lucie; Gutzmer, Ralf; Bender, Armin; Gebhardt, Christoffer; Romano, Emanuela; Meier, Friedegund; Martus, Peter; Maio, Michele; Blank, Christian; Schadendorf, Dirk; Dummer, Reinhard; Ascierto, Paolo A.; Hospers, Geke; Garbe, Claus; Wolchok, Jedd D.

    2016-01-01

    Purpose: Biomarkers for outcome after immune-checkpoint blockade are strongly needed as these may influence individual treatment selection or sequence. We aimed to identify baseline factors associated with overall survival (OS) after pembrolizumab treatment in melanoma patients. Experimental Design:

  3. Baseline inventory data users guide to abiotic GIS layers

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Baseline Inventory Team was chartered by the Fulfilling the Promises Implementation Team to recommend minimum abiotic and biotic inventories for the National...

  4. Seier NWR second year baseline CCP preparation surveys

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Final report for a project to collect baseline biological information on John W. And Louise Seier National Wildlife Refuge, to aid in preparation of 2014...

  5. Butler Hollow Glades : Baseline assessment and vegetation monitoring establishment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Several sampling and documentation protocols were implemented to establish baseline vegetation data. These data will provide a comparison point for future...

  6. Information architecture. Volume 2, Part 1: Baseline analysis summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The Department of Energy (DOE) Information Architecture, Volume 2, Baseline Analysis, is a collaborative and logical next-step effort in the processes required to produce a Departmentwide information architecture. The baseline analysis serves a diverse audience of program management and technical personnel and provides an organized way to examine the Department`s existing or de facto information architecture. A companion document to Volume 1, The Foundations, it furnishes the rationale for establishing a Departmentwide information architecture. This volume, consisting of the Baseline Analysis Summary (part 1), Baseline Analysis (part 2), and Reference Data (part 3), is of interest to readers who wish to understand how the Department`s current information architecture technologies are employed. The analysis identifies how and where current technologies support business areas, programs, sites, and corporate systems.

  7. Information architecture. Volume 2, Part 1: Baseline analysis summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The Department of Energy (DOE) Information Architecture, Volume 2, Baseline Analysis, is a collaborative and logical next-step effort in the processes required to produce a Departmentwide information architecture. The baseline analysis serves a diverse audience of program management and technical personnel and provides an organized way to examine the Department`s existing or de facto information architecture. A companion document to Volume 1, The Foundations, it furnishes the rationale for establishing a Departmentwide information architecture. This volume, consisting of the Baseline Analysis Summary (part 1), Baseline Analysis (part 2), and Reference Data (part 3), is of interest to readers who wish to understand how the Department`s current information architecture technologies are employed. The analysis identifies how and where current technologies support business areas, programs, sites, and corporate systems.

  8. Sterile Neutrino Fits to Short-Baseline Neutrino Oscillation Measurements

    Directory of Open Access Journals (Sweden)

    J. M. Conrad

    2013-01-01

    (3 + 2 and (3 + 3 fits, rather than (3 + 1 fits, for future neutrino oscillation phenomenology. These results motivate the pursuit of further short-baseline experiments, such as those reviewed in this paper.

  9. Baseline vegetation mapping : Fort Niobrara National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Final report for the baseline vegetation mapping project on Fort Niobrara National Wildlife Refuge. This project aims to create a vegetation map showing the...

  10. Baseline assessment of fish communities of the Flower Garden Banks

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The work developed baseline information on fish and benthic communities within the Flower Garden Banks National Marine Sanctuary (FGBNMS). Surveys employed diving,...

  11. LBCS: The LOFAR Long-Baseline Calibrator Survey

    Science.gov (United States)

    Jackson, N.; Tagore, A.; Deller, A.; Moldón, J.; Varenius, E.; Morabito, L.; Wucknitz, O.; Carozzi, T.; Conway, J.; Drabent, A.; Kapinska, A.; Orrù, E.; Brentjens, M.; Blaauw, R.; Kuper, G.; Sluman, J.; Schaap, J.; Vermaas, N.; Iacobelli, M.; Cerrigone, L.; Shulevski, A.; ter Veen, S.; Fallows, R.; Pizzo, R.; Sipior, M.; Anderson, J.; Avruch, I. M.; Bell, M. E.; van Bemmel, I.; Bentum, M. J.; Best, P.; Bonafede, A.; Breitling, F.; Broderick, J. W.; Brouw, W. N.; Brüggen, M.; Ciardi, B.; Corstanje, A.; de Gasperin, F.; de Geus, E.; Eislöffel, J.; Engels, D.; Falcke, H.; Garrett, M. A.; Grießmeier, J. M.; Gunst, A. W.; van Haarlem, M. P.; Heald, G.; Hoeft, M.; Hörandel, J.; Horneffer, A.; Intema, H.; Juette, E.; Kuniyoshi, M.; van Leeuwen, J.; Loose, G. M.; Maat, P.; McFadden, R.; McKay-Bukowski, D.; McKean, J. P.; Mulcahy, D. D.; Munk, H.; Pandey-Pommier, M.; Polatidis, A. G.; Reich, W.; Röttgering, H. J. A.; Rowlinson, A.; Scaife, A. M. M.; Schwarz, D. J.; Steinmetz, M.; Swinbank, J.; Thoudam, S.; Toribio, M. C.; Vermeulen, R.; Vocks, C.; van Weeren, R. J.; Wise, M. W.; Yatawatta, S.; Zarka, P.

    2016-11-01

    We outline the LOFAR Long-Baseline Calibrator Survey (LBCS), whose aim is to identify sources suitable for calibrating the highest-resolution observations made with the International LOFAR Telescope, which include baselines >1000 km. Suitable sources must contain significant correlated flux density (≳ 50 - 100 mJy) at frequencies around 110-190 MHz on scales of a few hundred milliarcseconds. At least for the 200-300-km international baselines, we find around 1 suitable calibrator source per square degree over a large part of the northern sky, in agreement with previous work. This should allow a randomly selected target to be successfully phase calibrated on the international baselines in over 50% of cases. Products of the survey include calibrator source lists and fringe-rate and delay maps of wide areas - typically a few degrees - around each source. The density of sources with significant correlated flux declines noticeably with baseline length over the range 200-600 km, with good calibrators on the longest baselines appearing only at the rate of 0.5 per sq. deg. Coherence times decrease from 1-3 min on 200-km baselines to about 1 min on 600-km baselines, suggesting that ionospheric phase variations contain components with scales of a few hundred kilometres. The longest median coherence time, at just over 3 min, is seen on the DE609 baseline, which at 227 km is close to being the shortest. We see median coherence times of between 80 and 110 s on the four longest baselines (580-600 km), and about 2 min for the other baselines. The success of phase transfer from calibrator to target is shown to be influenced by distance, in a manner that suggests a coherence patch at 150-MHz of the order of 1 deg. Although source structures cannot be measured in these observations, we deduce that phase transfer is affected if the calibrator source structure is not known. We give suggestions for calibration strategies and choice of calibrator sources, and describe the access to

  12. Fusion of a Variable Baseline System and a Range Finder

    Directory of Open Access Journals (Sweden)

    Rafael Arnay

    2011-12-01

    Full Text Available One of the greatest difficulties in stereo vision is the appearance of ambiguities when matching similar points from different images. In this article we analyze the effectiveness of using a fusion of multiple baselines and a range finder from a theoretical point of view, focusing on the results of using both prismatic and rotational articulations for baseline generation, and offer a practical case to prove its efficiency on an autonomous vehicle.

  13. THE 2014 ALMA LONG BASELINE CAMPAIGN: AN OVERVIEW

    Energy Technology Data Exchange (ETDEWEB)

    Partnership, ALMA [Astrophysics Research Institute, Liverpool John Moores University, IC2, Liverpool Science Park, 146 Brownlow Hill, Liverpool L3 5RF (United Kingdom); Fomalont, E. B.; Vlahakis, C.; Corder, S.; Remijan, A.; Barkats, D.; Dent, W. R. F.; Phillips, N.; Cox, P.; Hales, A. S. [Joint ALMA Observatory, Alonso de Córdova 3107, Vitacura, Santiago (Chile); Lucas, R. [Institut de Planétologie et d’Astrophysique de Grenoble (UMR 5274), BP 53, F-38041 Grenoble Cedex 9 (France); Hunter, T. R.; Brogan, C. L.; Amestica, R.; Cotton, W. [National Radio Astronomy Observatory, 520 Edgemont Road, Charlottesville, VA 22903 (United States); Asaki, Y. [National Astronomical Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo 181-8588 (Japan); Matsushita, S. [Institute of Astronomy and Astrophysics, Academia Sinica, P.O. Box 23-141, Taipei 106, Taiwan (China); Hills, R. E. [Astrophysics Group, Cavendish Laboratory, JJ Thomson Avenue, Cambridge CB3 0HE (United Kingdom); Richards, A. M. S. [Jodrell Bank Centre for Astrophysics, School of Physics and Astronomy, University of Manchester, Oxford Road, Manchester M13 9PL (United Kingdom); Broguiere, D., E-mail: efomalon@nrao.edu [Institut de Radioastronomie Millime´trique (IRAM), 300 rue de la Piscine, Domaine Universitaire, F-38406 Saint Martin d’Hères (France); and others

    2015-07-20

    A major goal of the Atacama Large Millimeter/submillimeter Array (ALMA) is to make accurate images with resolutions of tens of milliarcseconds, which at submillimeter (submm) wavelengths requires baselines up to ∼15 km. To develop and test this capability, a Long Baseline Campaign (LBC) was carried out from 2014 September to late November, culminating in end-to-end observations, calibrations, and imaging of selected Science Verification (SV) targets. This paper presents an overview of the campaign and its main results, including an investigation of the short-term coherence properties and systematic phase errors over the long baselines at the ALMA site, a summary of the SV targets and observations, and recommendations for science observing strategies at long baselines. Deep ALMA images of the quasar 3C 138 at 97 and 241 GHz are also compared to VLA 43 GHz results, demonstrating an agreement at a level of a few percent. As a result of the extensive program of LBC testing, the highly successful SV imaging at long baselines achieved angular resolutions as fine as 19 mas at ∼350 GHz. Observing with ALMA on baselines of up to 15 km is now possible, and opens up new parameter space for submm astronomy.

  14. MALDI-TOF Baseline Drift Removal Using Stochastic Bernstein Approximation

    Directory of Open Access Journals (Sweden)

    Howard Daniel

    2006-01-01

    Full Text Available Stochastic Bernstein (SB approximation can tackle the problem of baseline drift correction of instrumentation data. This is demonstrated for spectral data: matrix-assisted laser desorption/ionization time-of-flight mass spectrometry (MALDI-TOF data. Two SB schemes for removing the baseline drift are presented: iterative and direct. Following an explanation of the origin of the MALDI-TOF baseline drift that sheds light on the inherent difficulty of its removal by chemical means, SB baseline drift removal is illustrated for both proteomics and genomics MALDI-TOF data sets. SB is an elegant signal processing method to obtain a numerically straightforward baseline shift removal method as it includes a free parameter that can be optimized for different baseline drift removal applications. Therefore, research that determines putative biomarkers from the spectral data might benefit from a sensitivity analysis to the underlying spectral measurement that is made possible by varying the SB free parameter. This can be manually tuned (for constant or tuned with evolutionary computation (for .

  15. Precise baseline determination for the TanDEM-X mission

    Science.gov (United States)

    Koenig, Rolf; Moon, Yongjin; Neumayer, Hans; Wermuth, Martin; Montenbruck, Oliver; Jäggi, Adrian

    The TanDEM-X mission will strive for generating a global precise Digital Elevation Model (DEM) by way of bi-static SAR in a close formation of the TerraSAR-X satellite, already launched on June 15, 2007, and the TanDEM-X satellite to be launched in May 2010. Both satellites carry the Tracking, Occultation and Ranging (TOR) payload supplied by the GFZ German Research Centre for Geosciences. The TOR consists of a high-precision dual-frequency GPS receiver, called Integrated GPS Occultation Receiver (IGOR), and a Laser retro-reflector (LRR) for precise orbit determination (POD) and atmospheric sounding. The IGOR is of vital importance for the TanDEM-X mission objectives as the millimeter level determination of the baseline or distance between the two spacecrafts is needed to derive meter level accurate DEMs. Within the TanDEM-X ground segment GFZ is responsible for the operational provision of precise baselines. For this GFZ uses two software chains, first its Earth Parameter and Orbit System (EPOS) software and second the BERNESE software, for backup purposes and quality control. In a concerted effort also the German Aerospace Center (DLR) generates precise baselines independently with a dedicated Kalman filter approach realized in its FRNS software. By the example of GRACE the generation of baselines with millimeter accuracy from on-board GPS data can be validated directly by way of comparing them to the intersatellite K-band range measurements. The K-band ranges are accurate down to the micrometer-level and therefore may be considered as truth. Both TanDEM-X baseline providers are able to generate GRACE baselines with sub-millimeter accuracy. By merging the independent baselines by GFZ and DLR, the accuracy can even be increased. The K-band validation however covers solely the along-track component as the K-band data measure just the distance between the two GRACE satellites. In addition they inhibit an un-known bias which must be modelled in the comparison, so the

  16. Preliminary assessment report for Redmond Army National Guard Facility, Installation 53120, Redmond, Washington. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Ketels, P.; Aggarwal, P.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Washington Army National Guard (WAARNG) property in Redmond, Washington. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Redmond ARNG property, Phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations (ESOs) associated with the property are (1) supply/storage of hazardous materials, (2) weapons cleaning, (3) the underground storage tanks (USTs), and (4) the use of herbicides. These ESOs are no longer active because of the closure of OMS 10 activities in 1988.

  17. Renewable Energy Opportunities at the Kanto Installations, Japan

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most

  18. WEBsite of monitoring solar installations; Portal WEB de funcionamiento de instalaciones solares

    Energy Technology Data Exchange (ETDEWEB)

    Lopez, G.; Perez-Solano, M. J.

    2004-07-01

    This article shows an Internet Website of monitoring solar installations. It describes the most interesting characteristics of these installations and includes measures of their working variables. These values are presented in graphics and summarised reports. The solar installations are divided in four groups: Solar Thermal Installations, Domestic Solar Systems, Isolated Photovoltaic Installations and Grid Connected Photovoltaic Installations, however, in this article, the operation and the contents of this Website will be described based on the group of Solar Thermal Installations. This article describes the main page of the website and the necessary procedures to access to an installation, as well as the different screens related to this group. (Author)

  19. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  20. Utility company installs first Hudson River drilled crossing

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Directionally drilling a natural gas pipe line under the Hudson River called for innovative installation techniques including an elevated pullback over a heavily traveled commuter railroad. The 3,700-ft crossing was installed for Central Hudson Gas and Electric Corp. as part of an 11-mi system to supply natural gas from the Iroquois Gas Transmission System to the utility company's Roseton Generating Station. It represents the first horizontal drilled pipe line installation of the Hudson River and the longest drilled crossing in the US Northeast. At the point of installation, the line was designed to contend with an existing glacial till geology, the river crossing, eight electric cables near the right-of-way and the high-speed Metro North Railroad on the east side of the river. Through the interconnection with Iroquois, the utility receives up to 100 MMcfd of natural gas at 750 psig. Total cost of the new system was about $13.1 million with nearly $3.2 million dedicated to the crossing. This paper describes the installation procedures used in this project.

  1. Financing of Liabilities Beyond the Service Life of Nuclear Installations

    Directory of Open Access Journals (Sweden)

    L. Havlíček

    2006-01-01

    Full Text Available Operation of a nuclear installation is connected with the creation of long-term liabilities for spent fuel management and disposal, and also decommissioning of the installation (power plant, storages. This means that the operator will have to expend considerable amount of financial resources over a long period after the closure of installation. These financial resources will have to be created during operation of the installation. Related costs to be expended in future must be fully included in the price of electricity, in order to ensure fair competition among different operators. Financial resources for future coverage of liabilities must be continuously invested in order to compensate for inflation and to gain some real interest.Any failure by the operator to comply with its liabilities poses an economic and potentially an environmental hazard for operator’s country. Due attention must therefore be paid to assessing connected costs, defining liabilities and ensuring appropriate regulatory oversight. Appropriate measures must be well defined and firmly anchored in the legislation of countries operating nuclear installations. This paper reviews the basic principles that should ensure operator’s compliance their liabilities, and maps the current situation in the Czech Republic. 

  2. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  3. Physical installation of Pelletron and electron cooling system

    Energy Technology Data Exchange (ETDEWEB)

    Hurh, P.

    1997-09-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here.

  4. Intelligent devices simplify remote SCADA installations in substations

    Energy Technology Data Exchange (ETDEWEB)

    Kopriva, V.J. [Gilbert/Commonwealth, Inc., Reading, PA (United States)

    1994-12-31

    Utilities are increasingly relying on Supervisory Control and Data Acquisition (SCADA) Systems for the effective and economical management of electric transmission and distribution systems. Now, advances in equipment and design technologies have created opportunities for an increased level of monitoring and control at electric power substations. In the past, prohibitive factors, including complicated equipment and wiring retrofits, protocol compatibility, and hardware installation and maintenance costs have impeded electric utilities in their attempt at broad based application of SCADA systems in electric substations, particularly at distribution voltage levels. These advances in equipment technologies have provided utilities with the opportunity to install and operate SCADA systems at lower cost, while providing flexibility for system expansion over longer periods. The development of intelligent microprocessor controlled devices and integrated communications has facilitated the use of a distributed design approach to installing SCADA monitoring and control in substations. This approach offers greater hardware flexibility and reduced installation costs while increasing reliability, making the addition of monitoring and control to electric substations increasingly practical. This paper will examine current trends in the application of intelligent microprocessor controlled and electronic devices, in stand alone and distributed applications, and the simplification of techniques for installing SCADA systems in substations. It will also consider the potential advantages to be realized in cost and reliability, and examine the necessary changes in design and operation philosophies required to effectively implement the new technology.

  5. Energy efficiency of lighting installations: Software application and experimental validation

    Directory of Open Access Journals (Sweden)

    J.A. Lobão

    2015-11-01

    Full Text Available The rational use of energy and energy-efficient environmental public street lighting is an important topic. In the design of new public lighting installations, national regulations containing energy-efficient guidelines are already used. Nevertheless, either in new installations or in reconstructions of existing lighting, designers do not generally consider all the available means to save energy. In installations of street lighting, energy consumption can be reduced by reducing the losses in the conductors, associated with the efficiency of the equipment, allowing better use of the available energy. The losses in the conductors must be analysed in conjunction with all the loads that contribute to the current in the sections of the installed street lighting. When opting for more efficient lamps and luminaires or lighting control systems, the current decreases in the sections covered with the most significant power loss due to proportionality with the square of the current. This decrease, often forgotten, is considered in this work in the investment analysis of efficiency and sustainable street lighting via simulation and experimental results. This analysis, combined with the features and operating parameters of the electrical installation, accounts for all the gains that can make a difference in the choice of efficient street lighting.

  6. Deformation Monitoring of the Submillimetric UPV Calibration Baseline

    Science.gov (United States)

    García-Asenjo, Luis; Baselga, Sergio; Garrigues, Pascual

    2017-06-01

    A 330 m calibration baseline was established at the Universitat Politècnica de València (UPV) in 2007. Absolute scale was subsequently transferred in 2012 from the Nummela Standard Baseline in Finland and distances between pillars were determined with uncertainties ranging from 0.1 mm to 0.3 mm. In order to assess the long-term stability of the baseline three field campaigns were carried out from 2013 to 2015 in a co-operative effort with the Universidad Complutense de Madrid (UCM), which provided the only Mekometer ME5000 distance meter available in Spain. Since the application of the ISO17123-4 full procedure did not suffice to come to a definite conclusion about possible displacements of the pillars, we opted for the traditional geodetic network approach. This approach had to be adapted to the case at hand in order to deal with problems such as the geometric weakness inherent to calibration baselines and scale uncertainty derived from both the use of different instruments and the high correlation between the meteorological correction and scale determination. Additionally, the so-called the maximum number of stable points method was also tested. In this contribution it is described the process followed to assess the stability of the UPV submillimetric calibration baseline during the period of time from 2012 to 2015.

  7. Detection of abrupt baseline length changes using cumulative sums

    Science.gov (United States)

    Janssen, Volker

    2009-06-01

    Dynamic processes are usually monitored by collecting a time series of observations, which is then analysed in order to detect any motion or non-standard behaviour. Geodetic examples include the monitoring of dams, bridges, high-rise buildings, landslides, volcanoes and tectonic motion. The cumulative sum (CUSUM) test is recognised as a popular means to detect changes in the mean and/or the standard deviation of a time series and has been applied to various monitoring tasks. This paper briefly describes the CUSUM technique and how it can be utilised for the detection of small baseline length changes by differencing two perpendicular baselines sharing a common site. A simulation is carried out in order to investigate the expected behaviour of the resulting CUSUM charts for a variety of typical deformation monitoring scenarios. This simulation shows that using first differences (between successive epochs) as input, rather than the original baseline lengths, produces clear peaks or jumps in the differenced CUSUM time series when a sudden change in baseline length occurs. These findings are validated by analysing several GPS baseline pairs of a network deployed to monitor the propagation of an active ice shelf rift on the Amery Ice Shelf, East Antarctica.

  8. Combined GPS + BDS for short to long baseline RTK positioning

    Science.gov (United States)

    Odolinski, R.; Teunissen, P. J. G.; Odijk, D.

    2015-04-01

    The BeiDou Navigation Satellite System (BDS) has become fully operational in the Asia-Pacific region and it is of importance to evaluate what BDS brings when combined with the Global Positioning System (GPS). In this contribution we will look at the short, medium and long single-baseline real-time kinematic (RTK) positioning performance. Short baseline refers to when the distance between the two receivers is at most a few kilometers so that the relative slant ionospheric and tropospheric delays can be assumed absent, whereas with medium baseline we refer to when the uncertainty of these ionospheric delays can reliably be modeled as a function of the baseline length. With long baseline we refer to the necessity to parameterize the ionospheric delays and (wet) Zenith Tropospheric Delay (ZTD) as completely unknown. The GNSS real data are collected in Perth, Australia. It will be shown that combining the two systems allows for the use of higher than customary elevation cut-off angles. This can be of particular benefit in environments with restricted satellite visibility such as in open pit mines or urban canyons.

  9. LBCS: the LOFAR Long-Baseline Calibrator Survey

    CERN Document Server

    Jackson, N; Deller, A; Moldón, J; Varenius, E; Morabito, L; Wucknitz, O; Carozzi, T; Conway, J; Drabent, A; Kapinska, A; Orrù, E; Brentjens, M; Blaauw, R; Kuper, G; Sluman, J; Schaap, J; Vermaas, N; Iacobelli, M; Cerrigone, L; Shulevski, A; ter Veen, S; Fallows, R; Pizzo, R; Sipior, M; Anderson, J; Avruch, M; Bell, M; van Bemmel, I; Bentum, M; Best, P; Bonafede, A; Breitling, F; Broderick, J; Brouw, W; Brüggen, M; Ciardi, B; Corstanje, A; de Gasperin, F; de Geus, E; Eislöffel, J; Engels, D; Falcke, H; Garrett, M; Griessmeier, J; Gunst, A; van Haarlem, M; Heald, G; Hoeft, M; Hörandel, J; Horneffer, A; Intema, H; Juette, E; Kuniyoshi, M; van Leeuwen, J; Loose, G; Maat, P; McFadden, R; McKay-Bukowski, D; McKean, J; Mulcahy, D; Munk, H; Pandey-Pommier, M; Polatidis, A; Reich, W; Röttgering, H; Rowlinson, A; Scaife, A; Schwarz, D; Steinmetz, M; Swinbank, J; Thoudam, S; Toribio, M; Vermeulen, R; Vocks, C; van Weeren, R; Wise, M; Yatawatta, S; Zarka, P

    2016-01-01

    (abridged). We outline LBCS (the LOFAR Long-Baseline Calibrator Survey), whose aim is to identify sources suitable for calibrating the highest-resolution observations made with the International LOFAR Telescope, which include baselines >1000 km. Suitable sources must contain significant correlated flux density (50-100mJy) at frequencies around 110--190~MHz on scales of a few hundred mas. At least for the 200--300-km international baselines, we find around 1 suitable calibrator source per square degree over a large part of the northern sky, in agreement with previous work. This should allow a randomly selected target to be successfully phase calibrated on the international baselines in over 50% of cases. Products of the survey include calibrator source lists and fringe-rate and delay maps of wide areas -- typically a few degrees -- around each source. The density of sources with significant correlated flux declines noticeably with baseline length over the range 200--600~km, with good calibrators on the longest...

  10. Multiproject baselines for evaluation of electric power projects

    Energy Technology Data Exchange (ETDEWEB)

    Sathaye, Jayant; Murtishaw, Scott; Price, Lynn; Lefranc, Maurice; Roy, Joyashree; Winkler, Harald; Spalding-Fecher, Randall

    2003-03-12

    Calculating greenhouse gas emissions reductions from climate change mitigation projects requires construction of a baseline that sets emissions levels that would have occurred without the project. This paper describes a standardized multiproject methodology for setting baselines, represented by the emissions rate (kg C/kWh), for electric power projects. A standardized methodology would reduce the transaction costs of projects. The most challenging aspect of setting multiproject emissions rates is determining the vintage and types of plants to include in the baseline and the stringency of the emissions rates to be considered, in order to balance the desire to encourage no- or low-carbon projects while maintaining environmental integrity. The criteria for selecting power plants to include in the baseline depend on characteristics of both the project and the electricity grid it serves. Two case studies illustrate the application of these concepts to the electric power grids in eastern India and South Africa. We use hypothetical, but realistic, climate change projects in each country to illustrate the use of the multiproject methodology, and note the further research required to fully understand the implications of the various choices in constructing and using these baselines.

  11. Atmospheric pressure loading parameters from very long baseline interferometry observations

    Science.gov (United States)

    Macmillan, D. S.; Gipson, John M.

    1994-01-01

    Atmospheric mass loading produces a primarily vertical displacement of the Earth's crust. This displacement is correlated with surface pressure and is large enough to be detected by very long baseline interferometry (VLBI) measurements. Using the measured surface pressure at VLBI stations, we have estimated the atmospheric loading term for each station location directly from VLBI data acquired from 1979 to 1992. Our estimates of the vertical sensitivity to change in pressure range from 0 to -0.6 mm/mbar depending on the station. These estimates agree with inverted barometer model calculations (Manabe et al., 1991; vanDam and Herring, 1994) of the vertical displacement sensitivity computed by convolving actual pressure distributions with loading Green's functions. The pressure sensitivity tends to be smaller for stations near the coast, which is consistent with the inverted barometer hypothesis. Applying this estimated pressure loading correction in standard VLBI geodetic analysis improves the repeatability of estimated lengths of 25 out of 37 baselines that were measured at least 50 times. In a root-sum-square (rss) sense, the improvement generally increases with baseline length at a rate of about 0.3 to 0.6 ppb depending on whether the baseline stations are close to the coast. For the 5998-km baseline from Westford, Massachusetts, to Wettzell, Germany, the rss improvement is about 3.6 mm out of 11.0 mm. The average rss reduction of the vertical scatter for inland stations ranges from 2.7 to 5.4 mm.

  12. Hydrophone localization for the newly installed CTBTO station HA04 using noise from the installation vessel

    Science.gov (United States)

    Nielsen, Peter; Haralabus, Georgios; Stanley, Jerry; Zampolli, Mario; Grenard, Patrick; Brown, David; Le Bras, Ronan; Amir, Menachem; Slava, Bereza; Bittner, Paulina; Gore, Jane; Wang, Haijun

    2017-04-01

    During December 2016, the cabled hydroacoustic station HA04 was installed close to the Crozet Islands, France, in the southern Indian Ocean as part of the Comprehensive Nuclear-Test-Ban Treaty Organization's (CTBTO) International Monitoring System (IMS) designed to detect nuclear explosions worldwide. The HA04 station consists of two triplets of cabled to shore hydrophones deployed north and south of Crozet. Each triplet forms a two kilometre triangular configuration positioned in the Sound Fixing and Ranging channel for optimum performance. The water depth is approximately 1200 m with the hydrophones connected to a riser cable of approximately 700 m in length. The deployment was conducted from a cable vessel utilising high precision global and dynamic positioning system to position the sensors as close as possible to the planned locations. Although high confidence in the sensor locations was achieved during the vessel operation, the locations were verified by independent means in order to refine sensor locations, optimize station performance, and to ensure that the deployment was within the tolerance of the terms of reference for the deployment. The alternative estimate of the individual sensor locations was formulated as a global optimization problem with 10 unknown parameters, i.e., latitude, longitude and depth for each sensor within a station and an effective sound speed value in water. The objective function was defined as a least-mean-square type error function between modelled and measured arrival times between pairs of hydrophones. The arrival times were obtained by cross-correlating radiated noise from the surface vessel deploying the sensors while performing a dedicated known track for the purpose of the hydrophone localization. Results from the hydrophone localization estimation are presented and compared to the planned positions together with uncertainty estimates caused by independent modelling and measurement errors.

  13. Functional Testing Protocols for Commercial Building Efficiency Baseline Modeling Software

    Energy Technology Data Exchange (ETDEWEB)

    Jump, David; Price, Phillip N.; Granderson, Jessica; Sohn, Michael

    2013-09-06

    This document describes procedures for testing and validating proprietary baseline energy modeling software accuracy in predicting energy use over the period of interest, such as a month or a year. The procedures are designed according to the methodology used for public domain baselining software in another LBNL report that was (like the present report) prepared for Pacific Gas and Electric Company: ?Commercial Building Energy Baseline Modeling Software: Performance Metrics and Method Testing with Open Source Models and Implications for Proprietary Software Testing Protocols? (referred to here as the ?Model Analysis Report?). The test procedure focuses on the quality of the software?s predictions rather than on the specific algorithms used to predict energy use. In this way the software vendor is not required to divulge or share proprietary information about how their software works, while enabling stakeholders to assess its performance.

  14. A publication database for optical long baseline interferometry

    CERN Document Server

    Malbet, Fabien; Lawson, Peter; Taillifet, Esther; Lafrasse, Sylvain

    2010-01-01

    Optical long baseline interferometry is a technique that has generated almost 850 refereed papers to date. The targets span a large variety of objects from planetary systems to extragalactic studies and all branches of stellar physics. We have created a database hosted by the JMMC and connected to the Optical Long Baseline Interferometry Newsletter (OLBIN) web site using MySQL and a collection of XML or PHP scripts in order to store and classify these publications. Each entry is defined by its ADS bibcode, includes basic ADS informations and metadata. The metadata are specified by tags sorted in categories: interferometric facilities, instrumentation, wavelength of operation, spectral resolution, type of measurement, target type, and paper category, for example. The whole OLBIN publication list has been processed and we present how the database is organized and can be accessed. We use this tool to generate statistical plots of interest for the community in optical long baseline interferometry.

  15. Designing, Integrating, and Coordinating the Installation of MedAustron

    CERN Document Server

    Nicquevert, B; Benedikt, M

    2011-01-01

    "Give me a layout good enough and a building to place it, and I will install your accelerator". To paraphrase Archimedes, this is the role attributed to the Integration team in the MedAustron project. Starting with the optics layout and a building sketch, the integration work consists of a series of activities, interlinked in a complex manner. First the design and the integration of accelerator: list all items, define geometrical envelopes with interfaces, put them in position in CAD, identify conflicts and define input for design of items and of infrastructure. Then the various equipment is procured: verify and validate design data, follow-up manufacturing, fiducialize equipment and build supports. Lastly the global installation: check building and infrastructure, define survey framework, install and pre-align equipment on supports, move assemblies to their final location, survey actual position and adjust to theoretical position. The whole chain of operations from the layout to a real beam in MedAustron, i...

  16. PV Systems Installed in Marine Vessels: Technologies and Specifications

    Directory of Open Access Journals (Sweden)

    Ioannis Kobougias

    2013-01-01

    Full Text Available Considerations are held about the specificationin whichthe PV plants have to fulfill so that they can be installed on marine vessels. Initially, a brief description of the typical electrical grid of ships is presented, distinguishing the main parts, reporting the typical electrical magnitudes, and choosing the most preferable installation areas. The technical specifications,in whichthe PV plants have to be compatible with, are fully described. They are determined by the special marine environmental conditions, taking into consideration parameters like wind, humidity, shading, corrosion, and limited installation area. The work is carried out with the presentation of the most popular trends in the field of solar cell types and PV system technologies and their ability to keep up with the aforementioned specifications.

  17. High performance installation for drill and blast advance Mitholz, Switzerland

    Institute of Scientific and Technical Information of China (English)

    Jost Wenk

    2004-01-01

    The section Mitholz of the L tschberg Alp - Transit tunnel consists basically of 3 drill & blast advances with a cross section of 63 - 69m2 and a total length of 25 km.The high - performance back - up installation in use distinguishes itself by the following substantial innovations:The joint venture SATCO ( STRABAG AG, Rothpletz, Lienhard & Cie. , Walo Bertschinger AG, Vinci Construction,Skanska Europe AB), the c ontractor in charge, is achieving very high rates of advance, thanks to the high - performance back - up installations.- The chosen heading system has a positive effect on the entire construction program. Supplementary work can be done within the planned time schedule - Owing to the excellent performance, the joint venture SATCO is ahead on the construction program by about 700m.- The high rates of advance result for the customer in a positive return on investment - The installed equipment results in a higher safety at the workplace for the workers

  18. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  19. Environmental baselines: preparing for shale gas in the UK

    Science.gov (United States)

    Bloomfield, John; Manamsa, Katya; Bell, Rachel; Darling, George; Dochartaigh, Brighid O.; Stuart, Marianne; Ward, Rob

    2014-05-01

    Groundwater is a vital source of freshwater in the UK. It provides almost 30% of public water supply on average, but locally, for example in south-east England, it is constitutes nearly 90% of public supply. In addition to public supply, groundwater has a number of other uses including agriculture, industry, and food and drink production. It is also vital for maintaining river flows especially during dry periods and so is essential for maintaining ecosystem health. Recently, there have been concerns expressed about the potential impacts of shale gas development on groundwater. The UK has abundant shales and clays which are currently the focus of considerable interest and there is active research into their characterisation, resource evaluation and exploitation risks. The British Geological Survey (BGS) is undertaking research to provide information to address some of the environmental concerns related to the potential impacts of shale gas development on groundwater resources and quality. The aim of much of this initial work is to establish environmental baselines, such as a baseline survey of methane occurrence in groundwater (National methane baseline study) and the spatial relationships between potential sources and groundwater receptors (iHydrogeology project), prior to any shale gas exploration and development. The poster describes these two baseline studies and presents preliminary findings. BGS are currently undertaking a national survey of baseline methane concentrations in groundwater across the UK. This work will enable any potential future changes in methane in groundwater associated with shale gas development to be assessed. Measurements of methane in potable water from the Cretaceous, Jurassic and Triassic carbonate and sandstone aquifers are variable and reveal methane concentrations of up to 500 micrograms per litre, but the mean value is relatively low at 2km. The geological modelling process will be presented and discussed along with maps combining

  20. Association of Fetal Heart Rate Baseline Change and Neonatal Outcomes.

    Science.gov (United States)

    Yang, Michael; Stout, Molly J; López, Julia D; Colvin, Ryan; Macones, George A; Cahill, Alison G

    2017-07-01

    Objective The objective of this study was to describe the incidence of baseline change within normal range during labor and its prediction of neonatal outcomes. Materials and Methods This was a prospective cohort of singleton, nonanomalous, term neonates with continuous electronic fetal monitoring and normal baseline fetal heart rate throughout the last 2 hours of labor. We determined baseline in 10-minute segments using Eunice Kennedy Shriver National Institute of Child Health and Human Development criteria. We evaluated baseline changes of ≥ 20 and ≥ 30 bpm for association with acidemia (umbilical cord arterial pH ≤ 7.10) and neonatal intensive care unit (NICU) admission. Finally, we performed a sensitivity analysis of normal neonates, excluding those with acidemia, NICU admission, or 5-minute Apgar bpm; 272 (9.0%) had ≥ 30 bpm. Among normal neonates (n = 2,939), 1,221 (41.5%) had change ≥20 bpm. Acidemia was not associated with baseline change of any direction or magnitude. NICU admission was associated with decrease ≥ 20 bpm (adjusted odds ratio [aOR]: 2.93; 95% confidence interval [CI]: 1.19 - 7.21) or any direction ≥ 20 bpm (aOR: 4.06; 95% CI: 1.46-11.29). For decrease ≥ 20 bpm, sensitivity and specificity were 40.0 and 81.7%; for any direction ≥ 20 bpm, 75.0 and 58.3%. Conclusion Changes of normal baseline are common in term labor and poorly predict morbidity, regardless of direction or magnitude. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  1. Meeting the challenges of installing a mobile robotic system

    Science.gov (United States)

    Decorte, Celeste

    1994-01-01

    The challenges of integrating a mobile robotic system into an application environment are many. Most problems inherent to installing the mobile robotic system fall into one of three categories: (1) the physical environment - location(s) where, and conditions under which, the mobile robotic system will work; (2) the technological environment - external equipment with which the mobile robotic system will interact; and (3) the human environment - personnel who will operate and interact with the mobile robotic system. The successful integration of a mobile robotic system into these three types of application environment requires more than a good pair of pliers. The tools for this job include: careful planning, accurate measurement data (as-built drawings), complete technical data of systems to be interfaced, sufficient time and attention of key personnel for training on how to operate and program the robot, on-site access during installation, and a thorough understanding and appreciation - by all concerned - of the mobile robotic system's role in the security mission at the site, as well as the machine's capabilities and limitations. Patience, luck, and a sense of humor are also useful tools to keep handy during a mobile robotic system installation. This paper will discuss some specific examples of problems in each of three categories, and explore approaches to solving these problems. The discussion will draw from the author's experience with on-site installations of mobile robotic systems in various applications. Most of the information discussed in this paper has come directly from knowledge learned during installations of Cybermotion's SR2 security robots. A large part of the discussion will apply to any vehicle with a drive system, collision avoidance, and navigation sensors, which is, of course, what makes a vehicle autonomous. And it is with these sensors and a drive system that the installer must become familiar in order to foresee potential trouble areas in the

  2. Detecting dark energy in long baseline neutrino oscillations

    Institute of Scientific and Technical Information of China (English)

    GU Pei-Hong; BI Xiao-Jun; FENG Bo; YOUNG Bing-Lin; ZHANG Xin-Min

    2008-01-01

    In this paper, we discuss a possibility of studying properties of dark energy in long baseline neutrino oscillation experiments. We consider two types of models of neutrino dark energy. For one type of models the scalar field is taken to be quintessence-like and for the other phantom-like. In these models the scalar fields couple to the neutrinos to give rise to spatially varying neutrino masses. We will show that the two types of models predict different behaviors of the spatial variation of the neutrino masses inside the Earth and consequently result in different signals in long baseline neutrino oscillation experiments.

  3. Future long-baseline neutrino oscillations: View from Asia

    Energy Technology Data Exchange (ETDEWEB)

    Hayato, Yoshinari [Kamioka Observatory, ICRR, The University of Tokyo (Japan)

    2015-07-15

    Accelerator based long-baseline neutrino oscillation experiments have been playing important roles in revealing the nature of neutrinos. However, it turned out that the current experiments are not sufficient to study two major remaining problems, the CP violation in the lepton sector and the mass hierarchy of neutrinos. Therefore, several new experiments have been proposed. Among of them, two accelerator based long-baseline neutrino oscillation experiments, the J-PARC neutrino beam and Hyper-Kamiokande, and MOMENT, have been proposed in Asia. These two projects are reviewed in this article.

  4. Solar central electric power generation - A baseline design

    Science.gov (United States)

    Powell, J. C.

    1976-01-01

    The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.

  5. Intermediate baseline appearance experiments and three-neutrino mixing schemes

    CERN Document Server

    Cardall, C Y; Cline, D; Cardall, Christian Y.; Fuller, George M.; Cline, David

    1997-01-01

    Three-neutrino mixing schemes suggested by Cardall \\& Fuller and Acker \\& Pakvasa are compared and contrasted. Both of these schemes seek to solve the solar and atmospheric neutrino problems {\\em and} to account for the possible neutrino oscillation signal in the LSND experiment. These neutrino oscillation schemes have different atmospheric and solar neutrino signatures that will be discriminated by Super-Kamiokande and SNO. They will also have different signatures in proposed long-baseline accelerator and reactor experiments. In particular, both of these schemes would give dramatic (and dramatically different) signals in an ``intermediate baseline'' experiment, such as the proposed ICARUS detector in the Jura mountains 17 km from CERN.

  6. Subtracting Technique of Baselines for Capillary Electrophoresis Signals

    Institute of Scientific and Technical Information of China (English)

    WANG Ying; MO Jin-yuan; CHEN Zuan-guang; GAO Yan

    2004-01-01

    The drifting baselines of capillary electrophoresis affect the veracity of analysis greatly. This paper presents Threshold Fitting Technique(TFT) so as to subtract the baselines from the original signals and emendate the signals. In TFT, wav elet and curve fitting technique are applied synthetically, thresholds are decided by the computer automatically. Many experiments of signal processing indicate that TFT is simple for being used, there are few man-induced factors, and the results are satisfactory. TFT can be applied for noisy signals without any pre-processing.

  7. EQUIVALENT BASELINE AND INTERFEROMETRIC PHASE OF CLUSTER SATELLITE SAR

    Institute of Scientific and Technical Information of China (English)

    Gong Min; Zhang Chuanwu; Huang Shunji

    2005-01-01

    The change of the equivalent baseline and interferometric phase of cluster SAR satellites is analyzed when the constellation circles around the Earth and the satellites rotate around the center at the same time. The letter provides assessment of baseline error and phase error which influence the precision of height measurement in the across-track interferometric mode. The mathematical model of cluster satellite movement is built, simulation analyses and the curve of height error are presented. The simulation results show that height measurement error can be compensated by the formulae derived in this letter, therefore, the Digital Elevation Models (DEM's) are recovered accurately.

  8. Addendum to the 2015 Eastern Interconnect Baselining and Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Amidan, Brett G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Follum, James D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-06-30

    This report serves as an addendum to the report 2015 Eastern Interconnect Baselining and Analysis Report (Amidan, Follum, and Freeman, 2015). This addendum report investigates the following: the impact of shorter record lengths and of adding a daily regularization term to the date/time models for angle pair measurements, additional development of a method to monitor the trend in phase angle pairs, the effect of changing the length of time to determine a baseline, when calculating atypical events, and a comparison between quantitatively discovered atypical events and actual events.

  9. Deepwater offshore windfarm. Design fabrication and installation study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report discusses the plans and benefits of using the Beatrice oil field installation for the development of the offshore Beatrice windfarm in the Moray Firth. The development of an economic support structure for wind turbine generators to allow development of deepwater wind farms was investigated, and the screening of structural designs, and the analysis of fatigue, fabrication and installation considerations is described. Details are given of the recommendation for a further examination of two structural designs as options for the Beatrice windfarm development, the estimated costs, and the results of an environmental review.

  10. Solar heating system installed at Troy, Ohio. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This document is the Final Report of the Solar Energy System located at Troy-Miami County Public Library, Troy, Ohio. The completed system is composed of tree basic subsystems: the collector system consisting of 3264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which includes a 5000-gallon insulated steel tank; and the distribution and control system which includes piping, pumping and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and is, therefore, a retrofit system. This report includes extracts from the site files, specifications, drawings, installation, operation and maintenance instructions.

  11. Installation of the AGATA Demonstrator and commissioning experiments at LNL

    Energy Technology Data Exchange (ETDEWEB)

    Recchia, Francesco, E-mail: recchia@pd.infn.i [INFN Sezione di Padova, Padova (Italy)

    2010-01-01

    The first phase of the AGATA project, namely the AGATA Demonstrator Array, consists of a subset of 5 triple clusters of the final array and will be used to demonstrate the feasibility of the {gamma}-ray tracking. The performance of the instrument has been estimated up to now only through Monte Carlo simulations and indirect measurements. The first installation is presently ongoing ay the Laboratori Nazionali di Legnaro, Italy, where it has replaced the CLARA array at the target position of the PRISMA magnetic spectrometer. In the present contribution, the details of the installation will be reviewed and preliminary results from the first in-beam commissioning test will be given.

  12. Photovoltaics for professionals solar electric systems marketing, design and installation

    CERN Document Server

    Falk, Antony; Remmers, Karl-Heinz

    2007-01-01

    For the building industry, the installation of photovoltaic systems has become a new field of activity. Interest in solar energy is growing and future business prospects are excellent. Photovoltaics for Professionals describes the practicalities of marketing, designing and installing photovoltaic systems, both grid-tied and stand-alone. It has been written for electricians, technicians, builders, architects and building engineers who want to get involved in this expanding industry. It answers all the beginner's questions as well as serving as a textbook and work of reference

  13. Solar system installation at Louisville, Kentucky (final report)

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-07

    A contract was awarded in June 1976 for the installation of a solar space heating and domestic hot water system at 2400 Watteroon Trail, Louisville, Kentucky. The overall philosophy used was to install both a liquid and a hot air system retrofitted to the existing office and combined warehouse building. The 1080 sq ft office space is heated first and excess heat is dumped into the warehouse. The two systems offered a unique opportunity to measure the performance and compare results of both air and liquid at one site. The two systems are described in detail and information on the data acquisition system is included.

  14. Status and perspectives of wind turbine installations in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Barra, L.; Arena, A.; Mizzoni, G.; Pirazzi, L. [ENEA, Rome (Italy). Energy Dept.

    1995-12-31

    The article intends to illustrate the Italian situation in wind sector, giving some elements to explain why some delay is registered with respect to other European countries. Further than the present day situation, from which it can be concluded that the diffusion process is still commencing, being installed only 20 MW, the perspectives are discussed. Projects for plant installations totaling about 430 MW have been submitted to the electric utility. The actual realization of these important initiatives will probably depend on the ability to use wind energy as an occasion to sustain economic development of the involved zones. (author)

  15. McClellan PV system installation provides key lessons

    Science.gov (United States)

    Kauffman, W. R.

    Design features and lessons learned in the installation of a 40 kWp solar cell array to supply power to a market on an airbase are outlined. The fixed-position modules interface with an inverter, ac and dc switchgear, controls, instrumentation, and an energy management system. The power control unit has a peak power tracking feature to maximize output from the 1142 cell modules. The inverter has functioned at over 98 percent efficiency near the 25 kW design range of the array. Moisture sealing to prevent ground faults was found necessary during the installation of the underground cabling.

  16. Rotary feeding system for metallic coating installation by electrodeposition

    Science.gov (United States)

    Stănescu, A.; Alecusan, A. M.; Dimitescu, A.

    2016-08-01

    The paper aims to present an alternative feeding system for metallic coatings lines by electrodeposition which lends itself to the circular arrangement of the cuvettes used in such plants. The novelty lies both, in the arrangement of the electrodeposition installation components and mechanical feeding and transport system for parts to be electrodeposited. The control and actuation system of this type of installation simplifies. Nevertheless, all these increase the system reliability and run lower maintenance costs, without adversely affecting the quality of the end product. The paper presents the justification for reducing the total energy consumption in the electrodeposition process, too.

  17. Deepwater offshore windfarm. Design fabrication and installation study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report discusses the plans and benefits of using the Beatrice oil field installation for the development of the offshore Beatrice windfarm in the Moray Firth. The development of an economic support structure for wind turbine generators to allow development of deepwater wind farms was investigated, and the screening of structural designs, and the analysis of fatigue, fabrication and installation considerations is described. Details are given of the recommendation for a further examination of two structural designs as options for the Beatrice windfarm development, the estimated costs, and the results of an environmental review.

  18. Stripe-PZT Sensor-Based Baseline-Free Crack Diagnosis in a Structure with a Welded Stiffener

    Directory of Open Access Journals (Sweden)

    Yun-Kyu An

    2016-09-01

    Full Text Available This paper proposes a stripe-PZT sensor-based baseline-free crack diagnosis technique in the heat affected zone (HAZ of a structure with a welded stiffener. The proposed technique enables one to identify and localize a crack in the HAZ using only current data measured using a stripe-PZT sensor. The use of the stripe-PZT sensor makes it possible to significantly improve the applicability to real structures and minimize man-made errors associated with the installation process by embedding multiple piezoelectric sensors onto a printed circuit board. Moreover, a new frequency-wavenumber analysis-based baseline-free crack diagnosis algorithm minimizes false alarms caused by environmental variations by avoiding simple comparison with the baseline data accumulated from the pristine condition of a target structure. The proposed technique is numerically as well as experimentally validated using a plate-like structure with a welded stiffener, reveling that it successfully identifies and localizes a crack in HAZ.

  19. Cost-effective way to enhance the capabilities of the LCLS baseline

    Energy Technology Data Exchange (ETDEWEB)

    Geloni, Gianluca [European XFEL GmbH, Hamburg (Germany); Kocharyan, Vitali; Saldin, Evgeni [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany)

    2010-08-15

    This paper discusses the potential for enhancing the LCLS hard X-ray FEL capabilities. In the hard X-ray regime, a high longitudinal coherence will be the key to such performance upgrade. The method considered here to obtain high longitudinal coherence is based on a novel single-bunch self-seeding scheme exploiting a single crystal monochromator, which is extremely compact and can be straightforwardly installed in the LCLS baseline undulator. We present simulation results dealing with the LCLS hard X-ray FEL, and show that this method can produce fully-coherent X-ray pulses at 100 GW power level. With the radiation beam monochromatized down to the Fourier transform limit, a variety of very different techniques leading to further improvements of the LCLS performance become feasible. In particular, we describe an efficient way for obtaining full polarization control at the LCLS hard X-ray FEL. We also propose to exploit crystals in the Bragg reflection geometry as movable deflectors for the LCLS X-ray transport systems. The hard X-ray beam can be deflected of an angle of order of a radian without perturbations. The monochromatization of the output radiation constitutes the key for reaching such result. Finally, we describe a newoptical pump - hard X-ray probe technique which will allow time-resolved studies at the LCLS baseline on the femtosecond time scale. The principle of operation of the proposed scheme is essentially based on the use of the time jitter between pump and probe pulses. This eliminates the need for timing XFELs to high-power conventional lasers with femtosecond accuracy. (orig.)

  20. ECG baseline wander reduction using linear phase filters

    NARCIS (Netherlands)

    Alsté, van J.A.; Eck, van W.; Hermann, O.E.

    1986-01-01

    The continuous real time reduction of baseline wander is a considerable problem in electrocardiography during exercises. Our solution consists of spectral filtering. The legitimacy of high-pass filtering of the ECG by means of digital linear phase filters with a low cut-off frequency as high as the

  1. BASELINE DESIGN/ECONOMICS FOR ADVANCED FISCHER-TROPSCH TECHNOLOGY

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-04-01

    Bechtel, along with Amoco as the main subcontractor, developed a Baseline design, two alternative designs, and computer process simulation models for indirect coal liquefaction based on advanced Fischer-Tropsch (F-T) technology for the U. S. Department of Energy's (DOE's) Federal Energy Technology Center (FETC).

  2. Revised SRC-I project baseline. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The SRC Process Area Design Baseline consists of six volumes. The first four were submitted to DOE on 9 September 1981. The fifth volume, summarizing the Category A Engineering Change Proposals (ECPs), was not submitted. The sixth volume, containing proprietary information on Kerr-McGee's Critical Solvent Deashing System, was forwarded to BRHG Synthetic Fuels, Inc. for custody, according to past instructions from DOE, and is available for perusal by authorized DOE representatives. DOE formally accepted the Design Baseline under ICRC Release ECP 4-1001, at the Project Configuration Control Board meeting in Oak Ridge, Tennessee on 5 November 1981. The documentation was then revised by Catalytic, Inc. to incorporate the Category B and C and Post-Baseline Engineering Change Proposals. Volumes I through V of the Revised Design Baseline, dated 22 October 1982, are nonproprietary and they were issued to the DOE via Engineering Change Notice (ECN) 4-1 on 23 February 1983. Volume VI again contains proprieary information on Kerr-McGee Critical Solvent Deashing System; it was issued to Burns and Roe Synthetic Fuels, Inc. Subsequently, updated process descriptions, utility summaries, and errata sheets were issued to the DOE and Burns and Roe Synthetic Fuels, Inc. on nonproprietary Engineering Change Notices 4-2 and 4-3 on 24 May 1983.

  3. Treatment decisions based on scalar and functional baseline covariates.

    Science.gov (United States)

    Ciarleglio, Adam; Petkova, Eva; Ogden, R Todd; Tarpey, Thaddeus

    2015-12-01

    The amount and complexity of patient-level data being collected in randomized-controlled trials offer both opportunities and challenges for developing personalized rules for assigning treatment for a given disease or ailment. For example, trials examining treatments for major depressive disorder are not only collecting typical baseline data such as age, gender, or scores on various tests, but also data that measure the structure and function of the brain such as images from magnetic resonance imaging (MRI), functional MRI (fMRI), or electroencephalography (EEG). These latter types of data have an inherent structure and may be considered as functional data. We propose an approach that uses baseline covariates, both scalars and functions, to aid in the selection of an optimal treatment. In addition to providing information on which treatment should be selected for a new patient, the estimated regime has the potential to provide insight into the relationship between treatment response and the set of baseline covariates. Our approach can be viewed as an extension of "advantage learning" to include both scalar and functional covariates. We describe our method and how to implement it using existing software. Empirical performance of our method is evaluated with simulated data in a variety of settings and also applied to data arising from a study of patients with major depressive disorder from whom baseline scalar covariates as well as functional data from EEG are available.

  4. The Dutch CAFE baseline: In or out of line?

    NARCIS (Netherlands)

    Jimmink BA; Folkert RJM; Thomas R; Beck JP; Eerdt MM van; Elzenga HE; Hoek KW van der; Hoen A; Peek CJ; LED; KMD; NMD; LVM; RIM; LDL

    2004-01-01

    The European Commission is constructing a strategy on air pollution within the Clean Air For Europe (CAFE) programme. This strategy will be based on assessments using the RAINS model for different policy ambitions where the CAFE baseline scenario and control strategies are employed. The Netherlands

  5. Emergency Response Capability Baseline Needs Assessment - Requirements Document

    Energy Technology Data Exchange (ETDEWEB)

    Sharry, J A

    2016-10-04

    This document was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by LLNL Emergency Management Department Head James Colson. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only addresses emergency response.

  6. An Overview of the 2014 ALMA Long Baseline Campaign

    CERN Document Server

    Partnership, ALMA; Vlahakis, C; Corder, S; Remijan, A; Barkats, D; Lucas, R; Hunter, T R; Brogan, C L; Asaki, Y; Matsushita, S; Dent, W R F; Hills, R E; Phillips, N; Richards, A M S; Cox, P; Amestica, R; Broguiere, D; Cotton, W; Hales, A S; Hiriart, R; Hirota, A; Hodge, J A; Impellizzeri, C M V; Kern, J; Kneissl, R; Liuzzo, E; Marcelino, N; Marson, R; Mignano, A; Nakanishi, K; Nikolic, B; Perez, J E; Pérez, L M; Toledo, I; Aladro, R; Butler, B; Cortes, J; Cortes, P; Dhawan, V; Di Francesco, J; Espada, D; Galarza, F; Garcia-Appadoo, D; Guzman-Ramirez, L; Humphreys, E M; Jung, T; Kameno, S; Laing, R A; Leon, S; Mangum, J; Marconi, G; Nagai, H; Nyman, L -A; Perley, R; Radiszcz, M; Rodón, J A; Sawada, T; Takahashi, S; Tilanus, R P J; van Kempen, T; Vilaro, B Vila; Watson, L C; Wiklind, T; Gueth, F; Tatematsu, K; Wootten, A; Castro-Carrizo, A; Chapillon, E; Dumas, G; de Gregorio-Monsalvo, I; Francke, H; Gallardo, J; Garcia, J; Gonzalez, S; Hibbard, J E; Hill, T; Kaminski, T; Karim, A; Krips, M; Kurono, Y; Lopez, C; Martin, S; Maud, L; Morales, F; Pietu, V; Plarre, K; Schieven, G; Testi, L; Videla, L; Villard, E; Whyborn, N; Zwaan, M A; Alves, F; Andreani, P; Avison, A; Barta, M; Bedosti, F; Bendo, G J; Bertoldi, F; Bethermin, M; Biggs, A; Boissier, J; Brand, J; Burkutean, S; Casasola, V; Conway, J; Cortese, L; Dabrowski, B; Davis, T A; Trigo, M Diaz; Fontani, F; Franco-Hernandez, R; Fuller, G; Madrid, R Galvan; Giannetti, A; Ginsburg, A; Graves, S F; Hatziminaoglou, E; Hogerheijde, M; Jachym, P; Serra, I Jimenez; Karlicky, M; Klaasen, P; Kraus, M; Kunneriath, D; Lagos, C; Longmore, S; Leurini, S; Maercker, M; Magnelli, B; Vidal, I Marti; Massardi, M; Maury, A; Muehle, S; Muller, S; Muxlow, T; O'Gorman, E; Paladino, R; Petry, D; Pineda, J; Randall, S; Richer, J S; Rossetti, A; Rushton, A; Rygl, K; Monge, A Sanchez; Schaaf, R; Schilke, P; Stanke, T; Schmalzl, M; Stoehr, F; Urban, S; van Kampen, E; Vlemmings, W; Wang, K; Wild, W; Yang, Y; Iguchi, S; Hasegawa, T; Saito, M; Inatani, J; Mizuno, N; Asayama, S; Kosugi, G; Morita, K -I; Chiba, K; Kawashima, S; Okumura, S K; Ohashi, N; Ogasawara, R; Sakamoto, S; Noguchi, T; Huang, Y -D; Liu, S -Y; Kemper, F; Koch, P M; Chen, M -T; Chikada, Y; Hiramatsu, M; Iono, D; Shimojo, M; Komugi, S; Kim, J; Lyo, A -R; Muller, E; Herrera, C; Miura, R E; Ueda, J; Chibueze, J; Su, Y -N; Trejo-Cruz, A; Wang, K -S; Kiuchi, H; Ukita, N; Sugimoto, M; Kawabe, R; Hayashi, M; Miyama, S; Ho, P T P; Kaifu, N; Ishiguro, M; Beasley, A J; Bhatnagar, S; Braatz, J A; Brisbin, D G; Brunetti, N; Carilli, C; Crossley, J H; D'Addario, L; Meyer, J L Donovan; Emerson, D T; Evans, A S; Fisher, P; Golap, K; Griffith, D M; Hale, A E; Halstead, D; Hardy, E J; Hatz, M C; Holdaway, M; Indebetouw, R; Jewell, P R; Kepley, A A; Kim, D -C; Lacy, M D; Leroy, A K; Liszt, H S; Lonsdale, C J; Matthews, B; McKinnon, M; Mason, B S; Moellenbrock, G; Moullet, A; Myers, S T; Ott, J; Peck, A B; Pisano, J; Radford, S J E; Randolph, W T; Venkata, U Rao; Rawlings, M; Rosen, R; Schnee, S L; Scott, K S; Sharp, N K; Sheth, K J; Simon, R S; Tsutsumi, T; Wood, S J

    2015-01-01

    A major goal of the Atacama Large Millimeter/submillimeter Array (ALMA) is to make accurate images with resolutions of tens of milliarcseconds, which at submillimeter (submm) wavelengths requires baselines up to ~15 km. To develop and test this capability, a Long Baseline Campaign (LBC) was carried out from September to late November 2014, culminating in end-to-end observations, calibrations, and imaging of selected Science Verification (SV) targets. This paper presents an overview of the campaign and its main results, including an investigation of the short-term coherence properties and systematic phase errors over the long baselines at the ALMA site, a summary of the SV targets and observations, and recommendations for science observing strategies at long baselines. Deep ALMA images of the quasar 3C138 at 97 and 241 GHz are also compared to VLA 43 GHz results, demonstrating an agreement at a level of a few percent. As a result of the extensive program of LBC testing, the highly successful SV imaging at long...

  7. THE FIRST VERY LONG BASELINE INTERFEROMETRIC SETI EXPERIMENT

    Energy Technology Data Exchange (ETDEWEB)

    Rampadarath, H.; Morgan, J. S.; Tingay, S. J.; Trott, C. M., E-mail: hayden.rampadarath@icrar.org [International Centre for Radio Astronomy Research, Curtin University, GPO Box U1987, Perth, WA (Australia)

    2012-08-15

    The first Search for Extra-Terrestrial Intelligence (SETI) conducted with very long baseline interferometry (VLBI) is presented. By consideration of the basic principles of interferometry, we show that VLBI is efficient at discriminating between SETI signals and human generated radio frequency interference (RFI). The target for this study was the star Gliese 581, thought to have two planets within its habitable zone. On 2007 June 19, Gliese 581 was observed for 8 hr at 1230-1544 MHz with the Australian Long Baseline Array. The data set was searched for signals appearing on all interferometer baselines above five times the noise limit. A total of 222 potential SETI signals were detected and by using automated data analysis techniques were ruled out as originating from the Gliese 581 system. From our results we place an upper limit of 7 MW Hz{sup -1} on the power output of any isotropic emitter located in the Gliese 581 system within this frequency range. This study shows that VLBI is ideal for targeted SETI including follow-up observations. The techniques presented are equally applicable to next-generation interferometers, such as the long baselines of the Square Kilometre Array.

  8. Moon-Based INSAR Geolocation and Baseline Analysis

    Science.gov (United States)

    Liu, Guang; Ren, Yuanzhen; Ye, Hanlin; Guo, Huadong; Ding, Yixing; Ruan, Zhixing; Lv, Mingyang; Dou, Changyong; Chen, Zhaoning

    2016-07-01

    Earth observation platform is a host, the characteristics of the platform in some extent determines the ability for earth observation. Currently most developing platforms are satellite, in contrast carry out systematic observations with moon based Earth observation platform is still a new concept. The Moon is Earth's only natural satellite and is the only one which human has reached, it will give people different perspectives when observe the earth with sensors from the moon. Moon-based InSAR (SAR Interferometry), one of the important earth observation technology, has all-day, all-weather observation ability, but its uniqueness is still a need for analysis. This article will discuss key issues of geometric positioning and baseline parameters of moon-based InSAR. Based on the ephemeris data, the position, liberation and attitude of earth and moon will be obtained, and the position of the moon-base SAR sensor can be obtained by coordinate transformation from fixed seleno-centric coordinate systems to terrestrial coordinate systems, together with the Distance-Doppler equation, the positioning model will be analyzed; after establish of moon-based InSAR baseline equation, the different baseline error will be analyzed, the influence of the moon-based InSAR baseline to earth observation application will be obtained.

  9. Automated baseline change detection phase I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Automated Baseline Change Detection (ABCD) project is supported by the DOE Morgantown Energy Technology Center (METC) as part of its ER&WM cross-cutting technology program in robotics. Phase 1 of the Automated Baseline Change Detection project is summarized in this topical report. The primary objective of this project is to apply robotic and optical sensor technology to the operational inspection of mixed toxic and radioactive waste stored in barrels, using Automated Baseline Change Detection (ABCD), based on image subtraction. Absolute change detection is based on detecting any visible physical changes, regardless of cause, between a current inspection image of a barrel and an archived baseline image of the same barrel. Thus, in addition to rust, the ABCD system can also detect corrosion, leaks, dents, and bulges. The ABCD approach and method rely on precise camera positioning and repositioning relative to the barrel and on feature recognition in images. In support of this primary objective, there are secondary objectives to determine DOE operational inspection requirements and DOE system fielding requirements.

  10. Attendance at Health Promotion Programs: Baseline Predictors and Program Outcomes.

    Science.gov (United States)

    Atkins, Catherine J.; And Others

    1990-01-01

    As part of a family cardiovascular health promotion project, 111 Mexican-American and 95 Anglo-American families with fifth or sixth grade children were assigned to either a primary prevention program involving 18 sessions or to a control condition. Correlates of attendance were low baseline scores on physical activity and cardiovascular fitness…

  11. International Space Station EXPRESS Pallet. Ground Demonstration Baseline Design Review

    Science.gov (United States)

    Schaffer, James R.

    1995-01-01

    This publication is comprised of the viewgraphs from the presentations of the EXPRESS Pallet Baseline Design Review meeting held July 20, 1995. Individual presentations addressed general requirements and objectives; mechanical, electrical, and data systems; software; operations and KSC (Kennedy Space Center) integration; payload candidates; thermal considerations; ground vs. flight demo; and recommended actions.

  12. Magical properties of 2540 km baseline Superbeam Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Umasankar, Sankagiri; Raut, Sushant [Department of Physics, Indian Institute of Technology - I.I.T. Bombay, Mumbai, 400076 Maharashtra (India); Singh, Ravi Shanker [Department of Physics, Barus-Holley building, 184 Hope Street, Brown University, Box 1843, Providence, RI 02912 (United States)

    2010-07-01

    The determination if the neutrino mixing matrix and mass-squared differences is one of the aims of neutrino physics today. This is a complicated affair, owing to the various parameter degeneracies. While the proposed 7500 km long 'magic baseline' experiment simplifies the task considerably, the intense beam required for such an experiment seems futuristic by current standards. As an alternative, we highlight the 'magical' properties of the 2540 km baseline. We propose a Superbeam experiment at this much shorter baseline with a narrow band NuMI-like beam, and demonstrate the ability of this single setup to distinguish between the two mass hierarchies. This, we show, is possible with a moderate exposure and by running the experiment in the neutrino mode only. Our results hold up to fairly small values of the mixing angle {theta}{sub 13} and irrespective of the value of the CP violating parameter. Unlike the magic baseline, it may also be possible to use this setup to measure CP violation in neutrino oscillation experiments. (authors)

  13. Baseline correction of intraoperative electromyography using discrete wavelet transform.

    Science.gov (United States)

    Rampp, Stefan; Prell, Julian; Thielemann, Henning; Posch, Stefan; Strauss, Christian; Romstöck, Johann

    2007-08-01

    In intraoperative analysis of electromygraphic signals (EMG) for monitoring purposes, baseline artefacts frequently pose considerable problems. Since artefact sources in the operating room can only be reduced to a limited degree, signal-processing methods are needed to correct the registered data online without major changes to the relevant data itself. We describe a method for baseline correction based on "discrete wavelet transform" (DWT) and evaluate its performance compared to commonly used digital filters. EMG data from 10 patients who underwent removal of acoustic neuromas were processed. Effectiveness, preservation of relevant EMG patterns and processing speed of a DWT based correction method was assessed and compared to a range of commonly used Butterworth, Resistor-Capacitor and Gaussian filters. Butterworth and DWT filters showed better performance regarding artefact correction and pattern preservation compared to Resistor-Capacitor and Gaussian filters. Assuming equal weighting of both characteristics, DWT outperformed the other methods: While Butterworth, Resistor-Capacitor and Gaussian provided good pattern preservation, the effectiveness was low and vice versa, while DWT baseline correction at level 6 performed well in both characteristics. The DWT method allows reliable and efficient intraoperative baseline correction in real-time. It is superior to commonly used methods and may be crucial for intraoperative analysis of EMG data, for example for intraoperative assessment of facial nerve function.

  14. The Dutch CAFE baseline: In or out of line?

    NARCIS (Netherlands)

    Jimmink BA; Folkert RJM; Thomas R; Beck JP; Eerdt MM van; Elzenga HE; Hoek KW van der; Hoen A; Peek CJ; LED; KMD; NMD; LVM; RIM; LDL

    2004-01-01

    The European Commission is constructing a strategy on air pollution within the Clean Air For Europe (CAFE) programme. This strategy will be based on assessments using the RAINS model for different policy ambitions where the CAFE baseline scenario and control strategies are employed. The Netherlands

  15. Baseline design of an OTEC pilot plantship. Volume C. Specifications

    Energy Technology Data Exchange (ETDEWEB)

    Glosten, L. R.; Bringloe, Thomas; Soracco, Dave; Fenstermacher, Earl; Magura, Donald; Sander, Olof; Richards, Dennis; Seward, Jerry

    1979-05-01

    Volume C is part of a three-volume report that presents a baseline engineering design of an Ocean Thermal Energy Conversion (OTEC) plantship. This volume provides the specifications for the hull, cold-water pipe, ship outfitting and machinery, OTEC power system, electrical system, and folded-tube heat exchangers.

  16. Delta Healthy Sprouts: Participants' Diet and Food Environment at Baseline

    Science.gov (United States)

    Local food environments influence the nutrition and health of area residents. This baseline analysis focuses on the food environments of women who participated in the Delta Healthy Sprouts project, a randomized, controlled, comparative trial designed to test the efficacy of two Maternal, Infant, an...

  17. Revised SRC-I project baseline. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    International Coal Refining Company (ICRC), in cooperation with the Commonwealth of Kentucky has contracted with the United States Department of Energy (DOE) to design, build and operate a first-of-its-kind plant demonstrating the economic, environmental, socioeconomic and technical feasibility of the direct coal liquefaction process known as SRC-I. ICRC has made a massive commitment of time and expertise to design processes, plan and formulate policy, schedules, costs and technical drawings for all plant systems. These fully integrated plans comprise the Project Baseline and are the basis for all future detailed engineering, plant construction, operation, and other work set forth in the contract between ICRC and the DOE. Volumes I and II of the accompanying documents constitute the updated Project Baseline for the SRC-I two-stage liquefaction plant. International Coal Refining Company believes this versatile plant design incorporates the most advanced coal liquefaction system available in the synthetic fuels field. SRC-I two-stage liquefaction, as developed by ICRC, is the way of the future in coal liquefaction because of its product slate flexibility, high process thermal efficiency, and low consumption of hydrogen. The SRC-I Project Baseline design also has made important state-of-the-art advances in areas such as environmental control systems. Because of a lack of funding, the DOE has curtailed the total project effort without specifying a definite renewal date. This precludes the development of revised accurate and meaningful schedules and, hence, escalated project costs. ICRC has revised and updated the original Design Baseline to include in the technical documentation all of the approved but previously non-incorporated Category B and C and new Post-Baseline Engineering Change Proposals.

  18. Environmental Assessment Installation Development and Base Realignment and Closure Actions

    Science.gov (United States)

    2007-01-01

    Intergovernmental Coordination for Enviro nmental Planning Public Involvement LIST OF TABLES Annua l and Average Monthly T-38 Passes at SeaRay Range...environmentally-sound install ation, and a wellness-oriented, physica lly-fi t workforce. This is accomplished through fitness, smoking cessation

  19. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... exhaust systems must ensure minimum risk of injury to personnel. Protection must be provided in compliance... in bulkhead penetration glands for dry exhaust systems. A wet exhaust pipe may be welded to a steel... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section...

  20. 24 CFR 3286.5 - Overview of installation program.

    Science.gov (United States)

    2010-04-01

    ... authorized by the Act to oversee the system established by the regulations in this part, as the Secretary... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban...

  1. Benchmark Design and Installation: A synthesis of Existing Information.

    Science.gov (United States)

    1987-07-01

    included. Slater and Slater (1979) and Floyd (1978) point out that benchmark designs and installation procedures have remained virtually unchanged for...structures Table 85 Splks, nails Tables 2,63 T9. 0 1 - In trees, posts, poles Fig. 39 0 - In roads, pavements Fig. 39, Table 33 0 libro than 10 ft dee

  2. Installation of NA62 Large Angle Veto detectors

    CERN Multimedia

    2012-01-01

    In May 2012, the NA62 collaboration has installed the first eight (out of 12) Large Angle Veto detectors for the accurate identification of photons. These subdetectors will re-use 3000 lead glass crystals with attached photomultipliers from the OPAL experiment at LEP – CERN’s former accelerator.

  3. ATLAS Tile Calorimeter central barrel assembly and installation.

    CERN Multimedia

    nikolai topilin

    2009-01-01

    These photos belong to the self-published book by Nikolai Topilin "ATLAS Hadron Calorimeter Assembly". The book is a collection of souvenirs from the years of assembly and installation of the Tile Hadron Calorimeter, which extended from November 2002 until May 2006.

  4. 14 CFR 1261.411 - Collection in installments.

    Science.gov (United States)

    2010-01-01

    ... the National Aeronautics and Space Administration (NASA) § 1261.411 Collection in installments. (a... unable to pay the debt in one lump sum must submit financial statements. If NASA agrees to accept payment...-judgment note, comparable to the Department of Justice Form USA-70a, should be obtained from a debtor...

  5. Streamlining U.S. Army Military Installation Map (MIM) Production

    Science.gov (United States)

    2010-06-01

    Assurance Plans ( QAPs ). Serves as the standardized data structure across all Army training and testing installations. Once populated, this...produced NGA MIMs and supporting documentation. All aspects reflect the layout, fonts, and features which are common to MIMs. Based on SRP QAP (CIP

  6. Power Quality Issues on Wind Power Installations in Denmark

    DEFF Research Database (Denmark)

    Sørensen, Poul Ejnar; Cutululis, Nicolaos Antonio; Lund, Torsten

    2007-01-01

    This paper introduces the power quality issues of wind power installations in a historic perspective, as the development from a few small wind turbines connected directly to the low voltage grid, to the present system with high penetration on the medium voltage distribution grids and two large...

  7. Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for

    Science.gov (United States)

    Denson, Erik C.

    2014-01-01

    This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.

  8. 47 CFR 0.121 - Location of field installations.

    Science.gov (United States)

    2010-10-01

    ... 0.121 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Organization Enforcement Bureau § 0.121 Location of field installations. (a) Field offices are located... Bureau or see the U.S. Government Manual. (b) Protected field offices are located at the following...

  9. Massive scale production and installation of flexible printed solar cells

    DEFF Research Database (Denmark)

    Hösel, Markus

    Printed solar cells can be prepared on a large scale (kilometers) on relatively small equipment using little material. The performance and lifetime are lower and shorter than many conventional PV technology but manufacturing speed, manufacturing cost, energy pay back time and installation speed can...

  10. 30 CFR 75.210 - Manual installation of temporary support.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Manual installation of temporary support. 75.210 Section 75.210 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Roof Support § 75.210...

  11. 24 CFR 3286.305 - Installation trainer criteria.

    Science.gov (United States)

    2010-04-01

    ... trainer, an individual or other training entity must provide to HUD evidence that each individual who will... curriculum. In order to register as a qualified trainer, an individual or other training entity must submit... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation trainer criteria....

  12. Contamination of Ground Water Samples from Well Installations

    DEFF Research Database (Denmark)

    Grøn, Christian; Madsen, Jørgen Øgaard; Simonsen, Y.

    1996-01-01

    Leaching of a plasticizer, N-butylbenzenesulfonamide, from ground water multilevel sampling installations in nylon has been demonstrated. The leaching resulted in concentrations of DOC and apparent AOX, both comparable with those observed in landfill contaminated ground waters. It is concluded th...

  13. Structure of Self-shielding Electron Beam Installation for Sterilization

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    In order to prevent terrorist using letters with anthrax germ or spores to postal route and disturbsociety, and defend the people’s life-safety China Institute of Atomic Energy (CIAE) has developed aself-shielding electron beam installation for sterilization (SEBIS).

  14. Heat conduction errors and time lag in cryogenic thermometer installations

    Science.gov (United States)

    Warshawsky, I.

    1973-01-01

    Installation practices are recommended that will increase rate of heat exchange between the thermometric sensing element and the cryogenic fluid, in addition to bringing about a reduction in the rate of undesired heat transfer to higher temperature objects. Formulas and numerical data are given that help to estimate the magnitude of heat conduction errors and of time lag in response.

  15. 33 CFR 183.552 - Plastic encased fuel tanks: Installation.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Plastic encased fuel tanks... § 183.552 Plastic encased fuel tanks: Installation. (a) Each fuel tank encased in cellular plastic foam or in fiber reinforced plastic must have the connections, fittings, and labels accessible...

  16. Radiation protection in Swiss nuclear installations; Strahlenschutz in Schweizer Kernanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Hammer, J.; Brunell, M. [Eidgenoessisches Nuklearsicherheitsinspektorat ENSI, Brugg (Switzerland)

    2015-07-01

    Well developed measures on operational radiation protection within Swiss nuclear installations will be presented. The focus lays on competent authority actions. Results of the last ten years, including events on radiation issues, will be discussed. Finally a view on challenges for radiation protection personnel with respect to a renewed Swiss radiation protection legislation based on recent ICRP recommendations will be given.

  17. 30 CFR 75.340 - Underground electrical installations.

    Science.gov (United States)

    2010-07-01

    ... electrical installations. (a) Underground transformer stations, battery charging stations, substations... temperature in the noncombustible structure reaches 165 °F; or (B) The carbon monoxide concentration reaches... calibrated with a known concentration of carbon monoxide and air sufficient to activate the closing door,...

  18. Installation Restoration Program. Phase 1 - Records Search, Elmendorf AFB, Alaska

    Science.gov (United States)

    1983-09-01

    appart ... in Quaternary materials, no obvious significant structural features that impact water movement are known to exist. The unconsolidated units...under atmospheric or artesian pressure GROUND WATER RESERVOIR: The earth materials and the intervening open spaces that contain ground water HARDFILL...Installation Restoration Hazardous Waste Management Past Solid Waste Disposal Sites Ground Water Contamination 26. ABSTRACT (CO- ffew. - reev. ilde It necessar

  19. Spallation Neutron Source High Power RF Installation and Commissioning Progress

    CERN Document Server

    McCarthy, Michael P; Bradley, Joseph T; Fuja, Ray E; Gurd, Pamela; Hardek, Thomas; Kang, Yoon W; Rees, Daniel; Roybal, William; Young, Karen A

    2005-01-01

    The Spallation Neutron Source (SNS) linac will provide a 1 GeV proton beam for injection into the accumulator ring. In the normal conducting (NC) section of this linac, the Radio Frequency Quadupole (RFQ) and six drift tube linac (DTL) tanks are powered by seven 2.5 MW, 402.5 MHz klystrons and the four coupled cavity linac (CCL) cavities are powered by four 5.0 MW, 805 MHz klystrons. Eighty-one 550 kW, 805 MHz klystrons each drive a single cavity in the superconducting (SC) section of the linac. The high power radio frequency (HPRF) equipment was specified and procured by LANL and tested before delivery to ensure a smooth transition from installation to commissioning. Installation of RF equipment to support klystron operation in the 350-meter long klystron gallery started in June 2002. The final klystron was set in place in September 2004. Presently, all RF stations have been installed and high power testing has been completed. This paper reviews the progression of the installation and testing of the HPRF Sys...

  20. Systems study of drilling for installation of geothermal heat pumps

    Energy Technology Data Exchange (ETDEWEB)

    Finger, J.T.; Sullivan, W.N.; Jacobson, R.D.; Pierce, K.G.

    1997-09-01

    Geothermal, or ground-source, heat pumps (GHP) are much more efficient than air-source units such as conventional air conditioners. A major obstacle to their use is the relatively high initial cost of installing the heat-exchange loops into the ground. In an effort to identify drivers which influence installation cost, a number of site visits were made during 1996 to assess the state-of-the-art in drilling for GHP loop installation. As an aid to quantifying the effect of various drilling-process improvements, we constructed a spread-sheet based on estimated time and material costs for all the activities required in a typical loop-field installation. By substituting different (improved) values into specific activity costs, the effect on total project costs can be easily seen. This report contains brief descriptions of the site visits, key points learned during the visits, copies of the spread-sheet, recommendations for further work, and sample results from sensitivity analysis using the spread-sheet.

  1. Documenting the Analogue Past in Marijke van Warmerdam's Film Installations

    NARCIS (Netherlands)

    Noordegraaf, J.

    2015-01-01

    Dutch visual artist Marijke van Warmerdam is best known for her film-based installations, which present simple settings or actions, such as a girl performing a handstand, in short, 16mm film loops that are projected in the gallery space. In 2011 van Warmerdam took the decision to digitize most of

  2. Reducing the environmental impact of a gas operated cogeneration installation

    Directory of Open Access Journals (Sweden)

    Irimie Sabin Ioan

    2017-01-01

    The amount of energy saved yearly, the specific fuel consumption and the environmental impact were determined by the comparative study. The diagrams representing the variation of the performance indicators according to the operation period were also created. The usefulness of the paper consists in the creation of the yearly optimum installation operation time chart.

  3. 26 CFR 1.6655-2 - Annualized income installment method.

    Science.gov (United States)

    2010-04-01

    ... period ending March 31, 2008 (as well as one quarter of any additional bonus liability properly... installment payments for its 2008 and 2009 taxable years. ABC is in the business of giving dancing lessons and... section 5.02 of Rev. Proc. 2004-34 for the advance payments it receives for dance lessons. On November...

  4. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... to avoid displacement. For the purpose of servicing and replacement, each appliance shall be both... the manufactured home. Any opening for ducts, piping, wiring, etc., shall be sealed. (e) A forced air... enclosure. (3) Cooling coils installed as a portion of, or in connection with, any forced-air furnace...

  5. 46 CFR 111.35-1 - Electrical propulsion installations.

    Science.gov (United States)

    2010-10-01

    ... CFR 110.10-1), except that each one for mobile offshore drilling units must meet the requirements in part 4, chapter 3, section 4/3.5.3 of ABS MODU Rules (incorporated by reference; see 46 CFR 110.10-1). ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1...

  6. 46 CFR 76.33-20 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... indicating devices shall be of an approved type. (f) All wiring and electrical circuits and equipment shall meet the applicable requirements of subchapter J (Electrical Engineering) of this chapter. (g) A framed chart or diagram shall be installed adjacent to the detecting cabinet and auxiliary panel indicating...

  7. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1

    Science.gov (United States)

    1986-03-28

    techniques used were developed by the United States Department of the Navy, Naval Facilities Engineering Command and are described in Cedergren (1977...429. 3 Cedergren , H. R., 1977, Seepage, Drainage and Flow Nets: John Wiley & Sons, New York. 4. CH 2M Hill, 1983. "Installation Restoration Program

  8. Mechanical installation for standby power house, Building No. 184-N

    Energy Technology Data Exchange (ETDEWEB)

    1960-09-01

    This specification covers the furnishing of piping, piping accessories, and certain specified mechanical equipment. Further it covers the provision of all labor, supervision, supplies, equipment and tools required for the handling, installation, painting, readying for operating and functional testing of all the equipment and systems described.

  9. Art at large: through performance and installation art

    NARCIS (Netherlands)

    van Mechelen, M.

    2013-01-01

    A collection of essays previously published in various international journals by art historian Marga van Mechelen, recognised for her expertise in the fields of conceptual, performance and video and installation art, this unusual book was handwritten by graphic designer Ilke Gers. This action in its

  10. Environmental Assessment: Installation Development at Vance Air Force Base, Oklahoma

    Science.gov (United States)

    2007-04-01

    present throughout both installations, but more prevalent on Kegel man. The Service recommends incorporating migratory birds into your environmental...Attachment 2 Project Number 15 16 1.7 18 19 21 Description/ Location Physical Fitness Center/ HA WC Addition Kegel man Fire Station Repair

  11. Electrical Installation and Maintenance: A Competency-Based Curriculum Manual.

    Science.gov (United States)

    Ball, Peggy, Ed.; And Others

    Described is a competency-based community college curriculum for programs in electrical installation and maintenance. The initial curriculum development project involved identifying career opportunities, determining the skills (tasks) required for each job, and analyzing each task for necessary competencies and performance criteria. Project…

  12. Composite rotor blades for large wind energy installations

    Science.gov (United States)

    Kussmann, A.; Molly, J.; Muser, D.

    1980-01-01

    The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.

  13. Criteria for Evaluating United States Marine Corps Installation Strategic Management

    Science.gov (United States)

    2001-12-01

    business success for the organization. The scoring weights emphasize those items identified in Marine Corps strategic documents as being of...should use this or a similar process to evaluate themselves. This system helps installations focus on keys to business success . If the Marine

  14. Transformation of Installation Management: An Analysis of Organizational Change

    Science.gov (United States)

    2006-03-15

    This paper analyzes the dynamics of organizational change that led the Department of the Army (DA) to establish the Installation Management Agency...to establish the IMA. Viewed through the lenses of contingency and organizational theory this paper provides answers related to organizational change that are relevant to today’s strategic leaders.

  15. Installation of one supermodule of the ALICE Transition Radiation Detector.

    CERN Multimedia

    Saba, A.

    2006-01-01

    In order to be installed in the correct position, the TRD supermodule is placed in a special rotating frame. The space to fit the module is very tight, so the insertion is monitored from outside but also from inside the space frame.

  16. Installing, Configuring and Implementing an SMF in Joomla

    Directory of Open Access Journals (Sweden)

    Maria Cristina ENACHE

    2009-01-01

    Full Text Available This paper’s goal is to show how an asynchronous communication componentwhich can also be used in teaching activities was installed, configured andimplemented on the website of the Department of Accounting and EconomicInformatics of the Economics Faculty within the Dunarea de Jos University inGalati. This component is known under the name of forum or discussionboard.

  17. Assessment approaches to logistics for offshore wind energy installation

    NARCIS (Netherlands)

    Vis, Iris F.A.; Ursavas, Evrim

    2016-01-01

    Offshore wind farm installation planning is highly complex, due to the high dependency on weather and the oversized components that impose specific constraints in areas such as transportation and lifting. Currently, there is very little transparency vis-à-vis the logistics challenges in the industry

  18. Analysis of Bright Harvest Remote Analysis for Residential Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Nangle, John [National Renewable Energy Lab. (NREL), Golden, CO (United States); Simon, Joseph [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-06-17

    Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.

  19. 46 CFR 182.422 - Integral and non-integral keel cooler installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Integral and non-integral keel cooler installations. 182... VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.422 Integral and non-integral keel cooler installations. (a) A keel cooler installation used for engine cooling...

  20. 46 CFR 169.608 - Non-integral keel cooler installations

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Non-integral keel cooler installations 169.608 Section... SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.608 Non-integral keel cooler installations (a) Hull penetrations for non-integral keel cooler installations must be made...