  1. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  2. 45 CFR 1355.35 - Program improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program improvement plans. 1355.35 Section 1355.35... plans. (a) Mandatory program improvement plan. (1) States found not to be operating in substantial conformity shall develop a program improvement plan. The program improvement plan must: (i) Be developed...

  3. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  4. 25 CFR 170.415 - What is pre-project planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall...

  5. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    Science.gov (United States)

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  6. NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services

    Science.gov (United States)

    Johnsen, Susan K., Ed.

    2012-01-01

    The new Pre-K-Grade 12 Gifted Education Programming Standards should be part of every school district's repertoire of standards to ensure that the learning needs of advanced students are being met. "NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services" details six standards that…

  7. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    Science.gov (United States)

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  8. Pre-Existing Condition Insurance Plan Data

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Affordable Care Act created the new Pre-Existing Condition Insurance Plan (PCIP) program to make health insurance available to Americans denied coverage by...

  9. Evaluation of Pre-Departure English Training Program

    Directory of Open Access Journals (Sweden)

    Ali Saukah

    2016-02-01

    Full Text Available The program evaluation reported in this article covers three batches of participants, from 1996 through 1997, sponsored by the Directorate General of Higher Education projects to prepare faculty members of teacher training institutions for overseas studies. The result outcomes could be achieved when the initial English competence requirred for participating in the program was at least at the Pre-Advanced level. The criterion validity of the TOEFL-Equivalent test developed by the program was assured, and the test could, therefore, be used as a good predictor of the International TOEFL. Other recommendations are also given for the improvement of the planning and implementation of the program in the future

  10. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  11. The use of mixed-integer programming for inverse treatment planning with pre-defined field segments

    International Nuclear Information System (INIS)

    Bednarz, Greg; Michalski, Darek; Houser, Chris; Huq, M. Saiful; Xiao Ying; Rani, Pramila Anne; Galvin, James M.

    2002-01-01

    Complex intensity patterns generated by traditional beamlet-based inverse treatment plans are often very difficult to deliver. In the approach presented in this work the intensity maps are controlled by pre-defining field segments to be used for dose optimization. A set of simple rules was used to define a pool of allowable delivery segments and the mixed-integer programming (MIP) method was used to optimize segment weights. The optimization problem was formulated by combining real variables describing segment weights with a set of binary variables, used to enumerate voxels in targets and critical structures. The MIP method was compared to the previously used Cimmino projection algorithm. The field segmentation approach was compared to an inverse planning system with a traditional beamlet-based beam intensity optimization. In four complex cases of oropharyngeal cancer the segmental inverse planning produced treatment plans, which competed with traditional beamlet-based IMRT plans. The mixed-integer programming provided mechanism for imposition of dose-volume constraints and allowed for identification of the optimal solution for feasible problems. Additional advantages of the segmental technique presented here are: simplified dosimetry, quality assurance and treatment delivery. (author)

  12. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    Science.gov (United States)

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  13. The effectiveness of CCDSR learning model to improve skills of creating lesson plan and worksheet science process skill (SPS) for pre-service physics teacher

    Science.gov (United States)

    Limatahu, I.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.

  14. 78 FR 40625 - National School Lunch Program: Direct Certification Continuous Improvement Plans Required by the...

    Science.gov (United States)

    2013-07-08

    ... National School Lunch Program: Direct Certification Continuous Improvement Plans Required by the Healthy... Continuous Improvement Plans Required by the Healthy, Hunger-Free Kids Act of 2010'' on February 22, 2013... performance benchmarks and to develop and implement continuous improvement plans if they fail to do so. The...

  15. 23 CFR 1200.25 - Improvement plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Improvement plan. 1200.25 Section 1200.25 Highways... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...

  16. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  17. Nuclear Station Facilities Improvement Planning

    International Nuclear Information System (INIS)

    Hooks, R. W.; Lunardini, A. L.; Zaben, O.

    1991-01-01

    An effective facilities improvement program will include a plan for the temporary relocation of personnel during the construction of an adjoining service building addition. Since the smooth continuation of plant operation is of paramount importance, the phasing plan is established to minimize the disruptions in day-to-day station operation and administration. This plan should consider the final occupancy arrangements and the transition to the new structure; for example, computer hookup and phase-in should be considered. The nuclear industry is placing more emphasis on safety and reliability of nuclear power plants. In order to do this, more emphasis is placed on operations and maintenance. This results in increased size of managerial, technical and maintenance staffs. This in turn requires improved office and service facilities. The facilities that require improvement may include training areas, rad waste processing and storage facilities, and maintenance facilities. This paper discusses an approach for developing an effective program to plan and implement these projects. These improvement projects can range in magnitude from modifying a simple system to building a new structure to allocating space for a future project. This paper addresses the planning required for the new structures with emphasis on site location, space allocation, and internal layout. Since facility planning has recently been completed by Sargent and Leyden at six U. S. nuclear stations, specific examples from some of those plants are presented. Site planning and the establishment of long-range goals are of the utmost importance when undertaking a facilities improvement program for a nuclear station. A plan that considers the total site usage will enhance the value of both the new and existing facilities. Proper planning at the beginning of the program can minimize costs and maximize the benefits of the program

  18. Applying national survey results for strategic planning and program improvement: the National Diabetes Education Program.

    Science.gov (United States)

    Griffey, Susan; Piccinino, Linda; Gallivan, Joanne; Lotenberg, Lynne Doner; Tuncer, Diane

    2015-02-01

    Since the 1970s, the federal government has spearheaded major national education programs to reduce the burden of chronic diseases in the United States. These prevention and disease management programs communicate critical information to the public, those affected by the disease, and health care providers. The National Diabetes Education Program (NDEP), the leading federal program on diabetes sponsored by the National Institutes of Health (NIH) and the Centers for Disease Control and Prevention (CDC), uses primary and secondary quantitative data and qualitative audience research to guide program planning and evaluation. Since 2006, the NDEP has filled the gaps in existing quantitative data sources by conducting its own population-based survey, the NDEP National Diabetes Survey (NNDS). The NNDS is conducted every 2–3 years and tracks changes in knowledge, attitudes and practice indicators in key target audiences. This article describes how the NDEP has used the NNDS as a key component of its evaluation framework and how it applies the survey results for strategic planning and program improvement. The NDEP's use of the NNDS illustrates how a program evaluation framework that includes periodic population-based surveys can serve as an evaluation model for similar national health education programs.

  19. School Improvement Plans and Student Achievement: Preliminary Evidence from the Quality and Merit Project in Italy

    Science.gov (United States)

    Caputo, Andrea; Rastelli, Valentina

    2014-01-01

    This study provides preliminary evidence from an Italian in-service training program addressed to lower secondary school teachers which supports school improvement plans (SIPs). It aims at exploring the association between characteristics/contents of SIPs and student improvement in math achievement. Pre-post standardized tests and text analysis of…

  20. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  1. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  2. 24 CFR 901.145 - Improvement Plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Improvement Plan. 901.145 Section... PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM § 901.145 Improvement Plan. (a) After receipt of the State... a PHA, or a RMC through the PHA, to prepare and submit to the State/Area Office an Improvement Plan...

  3. The effectiveness of Concept Mapping Content Representation Lesson Study (ComCoReLS) model to improve skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher

    Science.gov (United States)

    Purwaningsih, E.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.

  4. SU-F-T-617: Remotely Pre-Planned Stereotactic Ablative Radiation Therapy: Validation of Treatment Plan Quality

    International Nuclear Information System (INIS)

    Juang, T; Bush, K; Loo, B; Gensheimer, M

    2016-01-01

    Purpose: We propose a workflow to improve access to stereotactic ablative radiation therapy (SABR) for rural patients. When implemented, a separate trip to the central facility for simulation can be eliminated. Two elements are required: (1) Fabrication of custom immobilization devices to match positioning on prior diagnostic CT (dxCT). (2) Remote radiation pre-planning on dxCT, with transfer of contours/plan to simulation CT (simCT) and initiation of treatment same-day or next day. In this retrospective study, we validated part 2 of the workflow using patients already treated with SABR for upper lobe lung tumors. Methods: Target/normal structures were contoured on dxCT; a plan was created and approved by the physician. Structures were transferred to simCT using deformable image registration and the plan was re-optimized on simCT. Plan quality was evaluated through comparison to gold-standard structures contoured on simCT and a gold-standard plan based on these structures. Workflow-generated plan quality in this study represents a worst-case scenario as these patients were not treated using custom immobilization to match dxCT position as would be done when the workflow is implemented clinically. Results: 5/6 plans created through the pre-planning workflow were clinically acceptable. For all six plans, the gold-standard GTV received full prescription dose, along with median PTV V95%=95.2% and median PTV D95%=95.4%. Median GTV DSC=0.80, indicating high degree of similarity between the deformed and gold-standard GTV contours despite small GTV sizes (mean=3.0cc). One outlier (DSC=0.49) resulted in inadequate PTV coverage (V95%=62.9%) in the workflow plan; in clinical practice, this mismatch between deformed/gold-standard GTV would be revised by the physician after deformable registration. For all patients, normal tissue doses were comparable to the gold-standard plan and well within constraints. Conclusion: Pre-planning SABR cases on diagnostic imaging generated

  5. Planning ability improves in a yogic education system compared to a modern.

    Science.gov (United States)

    Rangan, R; Nagendra, H R; Bhat, G Ramachandra

    2008-07-01

    Planning skills play a key role in higher developmental processes. The Tower of London test not only measures planning skills, but also the ability to execute plans. Yoga practices aim to bring about higher development. Can a Yoga-based education system be shown to meet this challenge? This study was aimed at comparing a Modern Education System (MES) with the ancient Yoga-based system of education, the Gurukula Education System (GES), in developing planning skills. Forty-nine boys with ages ranging from 11 to 13 years were selected from each of two residential schools, one MES and the other GES, providing similar ambience and daily routines. The boys were matched for age and socio-economic status. The GES educational program is based around integrated yoga modules while the MES provides a conventional modern education program. Planning and executive abilities were assessed using the Tower of London test at the start and the end of an academic year. Within groups, the pre-post test differences were significant for both groups. However, the between-groups results showed improvement in the GES group compared to the MES group at a P education improve planning and execution skills in school boys, GES is more effective of the two systems.

  6. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  7. HIV Pre-exposure Prophylaxis Program Implementation Using Intervention Mapping.

    Science.gov (United States)

    Flash, Charlene A; Frost, Elizabeth L T; Giordano, Thomas P; Amico, K Rivet; Cully, Jeffrey A; Markham, Christine M

    2018-04-01

    HIV pre-exposure prophylaxis has been proven to be an effective tool in HIV prevention. However, numerous barriers still exist in pre-exposure prophylaxis implementation. The framework of Intervention Mapping was used from August 2016 to October 2017 to describe the process of adoption, implementation, and maintenance of an HIV prevention program from 2012 through 2017 in Houston, Texas, that is nested within a county health system HIV clinic. Using the tasks outlined in the Intervention Mapping framework, potential program implementers were identified, outcomes and performance objectives established, matrices of change objectives created, and methods and practical applications formed. Results include the formation of three matrices that document program outcomes, change agents involved in the process, and the determinants needed to facilitate program adoption, implementation, and maintenance. Key features that facilitated successful program adoption and implementation were obtaining leadership buy-in, leveraging existing resources, systematic evaluation of operations, ongoing education for both clinical and nonclinical staff, and attention to emergent issues during launch. The utilization of Intervention Mapping to delineate the program planning steps can provide a model for pre-exposure prophylaxis implementation in other settings. Copyright © 2018. Published by Elsevier Inc.

  8. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  9. Emergency planning and preparedness: pre- and post-Three Mile Island

    International Nuclear Information System (INIS)

    Collins, H.E.

    1980-01-01

    The problems of radiological emergency response planning revealed by the Three-Mile Island nuclear power plant accident, are discussed. The most pressing problems are the need for an adequate planning basis, the improvement of accident assessment, the improvement and development of training programs, the need for adequate fundina and the development of emergency planning auidance. (H.K.)

  10. The Genesis of a Trauma Performance Improvement Plan.

    Science.gov (United States)

    Pidgeon, Kristopher

    2015-01-01

    The purpose of this article is to assist the trauma medical and program director with developing a performance improvement and patients safety plan (PIPS), which is a required component of a successful trauma verification process by the American College of Surgeons. This article will review trauma quality standards and will describe in detail the required elements of a successful trauma center's performance improvement plan including a written comprehensive plan that outlines the mission and vision of the PIPS Program, authority of the PIPS Program, PIPS Program Committee reporting structure to the other hospital committees, list of required PIPS multidisciplinary team members, the operational components of the utilized data management system (trauma registry), list of indicators/audit filters, levels of review, peer determinations, corrective action plan with implementation, event resolution, and reevaluation. Strategies to develop a successful trauma performance improvement plan are presented.

  11. Pre-Project planning of Capital Facilities at NASA

    OpenAIRE

    Barrow, Benjamin John

    1999-01-01

    This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for determining the necessary steps to follow in defining project scope and as a means to monitor progress and assess scope definition completeness at various stages during the NASA Pre-Project Planning process. This thesis also describes and identifies specific points in the NASA Capital Facility Programming Cycle for the performance of PDRI assessments ...

  12. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  13. Data management and data analysis techniques in pharmacoepidemiological studies using a pre-planned multi-database approach

    DEFF Research Database (Denmark)

    Bazelier, Marloes T.; Eriksson, Irene; de Vries, Frank

    2015-01-01

    pharmacoepidemiological multi-database studies published from 2007 onwards that combined data for a pre-planned common analysis or quantitative synthesis. Information was retrieved about study characteristics, methods used for individual-level analyses and meta-analyses, data management and motivations for performing...... meta-analysis (27%), while a semi-aggregate approach was applied in three studies (14%). Information on central programming or heterogeneity assessment was missing in approximately half of the publications. Most studies were motivated by improving power (86%). CONCLUSIONS: Pharmacoepidemiological multi...

  14. Choosing Pre-conception Planning for Women/Families: Counselling and Informed Consent (Part 2) - Pre-conception Reproductive Planning, Lifestyle, Immunization, and Psychosocial Issues.

    Science.gov (United States)

    Wilson, R Douglas

    2017-12-06

    To inform reproductive and other health care providers about pre-conception evaluation, including considerations for reproductive planning, lifestyle modification, immunization status and attitudes, and psychosocial issues. This counselling information can be used for patient education and planning and possible pre-conception and/or prenatal testing. This information may allow for improved risk assessment when pre-conception counselling for individual patients and their families is used. CONSIDERATIONS FOR PRE-CONCEPTION CARE (PART 2) REGARDING PRE-CONCEPTION REPRODUCTIVE PLANNING, LIFESTYLE, IMMUNIZATIONS, AND PSYCHOSOCIAL ISSUES: CONSIDERATION FOR CARE STATEMENTS: For this review article, the Consideration for Care Statements use the Grading of Recommendations, Assessment, Development and Evaluations strength and quality principles because they are comparable for the clinician and the patient/public user. For example, "Strong" for clinicians is defined as "the recommendation would apply to most individuals. Formal discussion aids are not likely to be needed to help individuals make decisions consistent with their values and preferences." For patients/the public, "Strong" is defined as, "we believe most people in this situation would want the recommended course of actions and only a small number would not." Quality of evidence (High, Moderate, Low) is based on the confidence that the true effect lies close to that of the estimate of the effect. In addition, the Canadian Task Force on Preventive Health Care key to evidence statements and grading of recommendations are included. PubMed, Medline, and the Cochrane Database were searched until May 2017, using appropriate key words (i.e., preconception, reproductive planning, lifestyle modification, immunization risks and benefits, psychosocial pregnancy factors/issues). Grey (unpublished) literature was identified through searching websites of health technology assessment and health technology assessment

  15. Pre-fire planning for nuclear power plants

    International Nuclear Information System (INIS)

    Talbert, J.H.

    1980-01-01

    Regardless of the fire prevention measures which are taken, plant experience indicates that fires will occur in a nuclear power plant. When a fire occurs, the plant staff must handle the fire emergency. Pre-fire planning is a method of developing detailed fire attack plans and salvage operations to protect equipment from damage due to fire and fire fighting operations. This paper describes the purpose and use of a pre-fire plan to achieve these goals in nuclear power plants

  16. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  17. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  18. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  19. An innovative approach for planning and execution of pre-experimental runs for Design of Experiments

    Directory of Open Access Journals (Sweden)

    Muhammad Arsalan Farooq

    2016-09-01

    Full Text Available This paper addresses the study of the pre-experimental planning phase of the Design of Experiments (DoE in order to improve the final product quality. The pre-experimental planning phase includes a clear identification of the problem statement, selection of control factors and their respective levels and ranges. To improve production quality based on the DoE a new approach for the pre-experimental planning phase, called Non-Conformity Matrix (NCM, is presented. This article also addresses the key steps of the pre-experimental runs considering a consumer goods manufacturing process. Results of the application for an industrial case show that this methodology can support a clear definition of the problem and also a correct identification of the factor ranges in particular situations. The proposed new approach allows modeling the entire manufacturing system holistically and correctly defining the factor ranges and respective levels for a more effective application of DoE. This new approach can be a useful resource for both research and industrial practitioners who are dedicated to large DoE projects with unknown factor interactions, when the operational levels and ranges are not completely defined.

  20. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  1. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  2. Examining pre-service science teachers' developing pedagogical design capacity for planning and supporting task-based classroom discussions

    Science.gov (United States)

    Ross, Danielle Kristina

    Teachers face many challenges as we move forward into the age of the Next Generation Science Standards (NGSS) (Achieve, Inc., 2013). The NGSS aim to develop a population of scientifically literate and talented students who can participate in the "innovation-driven economy" (p. 1). In order to meet these goals, teachers must provide students with opportunities to engage in science and engineering practices (SEPs) and learn core ideas of these disciplines. This study followed pre-service secondary science teachers as they participated in a secondary science teacher preparation program intended to support the development of their pedagogical design capacity (Brown, 2009) related to planning and supporting whole-class taskbased discussions. Teacher educators in this program designed an intervention that aimed in supporting this development. This study examined a particular dimension of PDC -- specifically, PSTs effective use of resources to plan science lessons in which students engage in a high demand task, participate in SEPs, and discuss their work in a whole-class setting. In order to examine the effectiveness of the intervention, I had to define PDC a priori. I measured PDC by documenting how/whether PSTs engaged in the following instructional planning practices: developing Learning Goals, selecting and/or designing challenging tasks, anticipating student thinking, planning for monitoring student thinking, imagining the discussion storyline, planning questions, and planning marking strategies. Analyses showed a significant difference between baseline lesson plan scores and Instructional Performance scores. These findings suggest these patterns and changes were directly linked to the teacher preparation program. The mean increase in Instructional Performance scores during the course of the teacher preparation year further supports the effect of the teacher preparation coursework. Pre-service teachers with high pedagogical design capacity continually integrated the

  3. Process Evaluation and Continuous Improvement in Community Youth Programs

    Directory of Open Access Journals (Sweden)

    Jennifer V. Trachtenberg

    2008-06-01

    Full Text Available A method of using process evaluation to provide improvement plans in order to promote community youth programs is described. The core elements of this method include the following: (1 collection and analysis of baseline data, (2 feedback provided to programs describing their strengths and limitations, (3 programs provided with assistance in preparing improvement plans in regard to their baseline data, and (4 follow-up evaluation assessed program changes based on their improvement plans and baseline data. A case study of an inner-city neighborhood youth center is used to demonstrate this method.

  4. A comprehensive medical student career development program improves medical student satisfaction with career planning.

    Science.gov (United States)

    Zink, Brian J; Hammoud, Maya M; Middleton, Eric; Moroney, Donney; Schigelone, Amy

    2007-01-01

    In 1999, the University of Michigan Medical School (UMMS) initiated a new career development program (CDP). The CDP incorporates the 4-phase career development model described by the Association of American Medical Colleges (AAMC) Careers in Medicine (CiM). The CDP offers self-assessment exercises with guidance from trained counselors for 1st- and 2nd-year medical students. Career exploration experiences include Career Seminar Series luncheons, shadow experiences with faculty, and a shadow program with second-year (M2) and fourth-year (M4) medical students. During the decision-making phase, students work with trained faculty career advisors (FCA). Mandatory sessions are held on career selection, preparing the residency application, interviewing, and program evaluation. During the implementation phase, students meet with deans or counselors to discuss residency application and matching. An "at-risk plan" assists students who may have difficulty matching. The CiM Web site is extensively used during the 4 stages. Data from the AAMC and UMMS Graduation Questionnaires (GQ) show significant improvements for UMMS students in overall satisfaction with career planning services and with faculty mentoring, career assessment activities, career information, and personnel availability. By 2003, UMMS students had significantly higher satisfaction in all measured areas of career planning services when compared with all other U.S. medical students.

  5. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a.... (iii) Appropriate improvements to control methods. (iv) Other steps appropriate to correct control...

  6. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    limited available resources of the suppliers to execute the work. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned using a dedicated core team, and involved much more involvement of the suppliers to ensure feasibility of the proposed program of work and more detailed specification of the required resources. Priorities for executing the diverse activities in the Program were originally set using criteria based on the risks that the liabilities presented to health and safety, to the environment and to AECL's ability to meet its obligations as the owner-operator of licensed nuclear sites. The LMU later recognized that the decision criteria should also explicitly include the value gained in reducing the risks and liabilities for expended funds. Greater consideration should be given to mitigating risks to the execution of the Program that might materialize. In addition, licensing strategies and processes should be better-defined, and waste characterization methods and disposition pathways would have to be put in place, or clearly identified, to deal with the wastes the Program would generate before many of the planned activities could be initiated. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and activities. These include developing a more formal procedure for setting priorities of the different parts of the Program, preparing an Integrated Waste Plan to identify the optimal suite of support facilities to be constructed, the creation of a series of 'pre-project initiation' procedures and documents to guide the development

  7. Strategic Planning to Improve EHDI Programs

    Science.gov (United States)

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  8. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  9. Decentralized Planning for Pre-Conflict and Post-Conflict ...

    African Journals Online (AJOL)

    Decentralized Planning for Pre-Conflict and Post-Conflict Management in the Bawku Municipal ... institutional arrangements for conflict monitoring and evaluation. Such processes are 'sine qua non' to pre-conflict and post-conflict prevention.

  10. Program planning for future improvement in managing ORNL's radioactive wastes

    International Nuclear Information System (INIS)

    1982-01-01

    This report is intended to serve as a reference document and guide in developing the long-term improvements section of ORNL's radioactive waste management plan. The report reviews ORNL's operations and future program needs in terms of currently applicable DOE regulations and also in terms of regulations and accepted practices of the commerical sector of the nuclear power industry so that the impact of potential future adoption of these regulations and standards on ORNL's operations can be fully evaluated. The principal conclusion reached after reviewing ORNL's waste management operations is that these operations are currently being conducted in a manner that does not endanger the health or safety of workers or the general public and that does not have an adverse effect on the environment. Although nineteen specific problem areas have been identified all of these problems can be attributed to one of the following: a) the legacy of past practices; b) gradual deterioration of systems which have reached (or are near to reaching) the end of their reasonable design lives; and c) potential changes in regulations applicable to ORNL. All of the programs designed to improve or correct these problem areas could be accomplished within a four year period. However, given current limitations on manpower and capital, these programs would more likely be spread out over a five to ten year period of time if they were all to be undertaken. The cost of undertaking all of these projects concurrently is estimated to be between 60 and 100 million dollars. Due to the many unknowns and uncertainties associated with the problem areas, actual total costs for specific projects could vary from those presented in this report by as much as 300 percent

  11. Decentralized Planning for Pre-Conflict and Post-Conflict ...

    African Journals Online (AJOL)

    2012-10-02

    Oct 2, 2012 ... Such processes are 'sine qua non' to pre-conflict and post-conflict prevention. .... A Basic Approach to Pre-Conflict Management Planning ... and also factor in an evaluation of perception variables that help us to understand ...

  12. Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

    International Nuclear Information System (INIS)

    Lessard, Leo; Kay, Jim; Lefrancois, Donald; Furr, Richard; Lucas, Matthieu; Schauer, Konrad

    2016-01-01

    Industry models for planning the efficient decommissioning of a nuclear power plant continue to evolve. Effective planning is a key to cost control, a critical aspect of decommissioning. In 2001, the Electric Power Research Institute (EPRI) published the 'Decommissioning Pre-Planning Manual', referred to as the 'Manual'. The goal of the Manual was to develop a framework for use in pre-planning the decommissioning of a nuclear power plant. The original research was based on information collected during the active decommissioning of power reactors in New England, and the ongoing decommissioning planning of another reactor still in operation. The research team identified thirty-two (32) major Decommissioning Tasks that support the strategic and tactical planning that can be conducted in advance of plant shutdown. The Decommissioning Tasks were organized in a logical sequence of execution, and sorted in common discipline groupings. Owners of U.S. nuclear plants that have shut down prematurely during the past 5 years have found the EPRI Decommissioning Pre-Planning Manual useful in developing their transition plans from an operating to shutdown facility. Concurrently, during the past 15 years, the IAEA has published numerous technical and safety reports on nuclear reactor decommissioning planning and execution. IAEA's goal is to provide its global members with useful and timely guidance for the planning and execution of nuclear decommissioning projects. This information has been used extensively by international nuclear plant operators. One of the key objectives will be to develop a road-map linking the 32 EPRI Decommissioning Tasks with the comparable (or equivalent) topics covered in the IAEA library of decommissioning knowledge. The logical and convenient structure of the Manual will be cross-referenced to the IAEA topics to aid in organizing the development of decommissioning plans. The road-map will serve to provide a basis for improved

  13. School Improvement Plans and Student Learning in Jamaica

    Science.gov (United States)

    Lockheed, Marlaine; Harris, Abigail; Jayasundera, Tamara

    2010-01-01

    A school improvement program that provided support to poor-performing schools on the basis of needs identified in a school improvement plan was implemented in 72 government schools in Jamaica, from 1998 to 2005. In this independent evaluation of the program, we use propensity score matching to create, post hoc, a control group of schools that were…

  14. Developing pre-service science teachers' pedagogical content knowledge by using training program

    Science.gov (United States)

    Udomkan, Watinee; Suwannoi, Paisan

    2018-01-01

    A training program was developed for enhancing pre-service science teachers' pedagogical content knowledge (PCK). The pre-service science teachers are able to: understand science curriculum, knowledge of assessment in science, knowledge of students' understanding of science, instructional strategies and orientations towards science teaching, which is conceptualized as PCK [5]. This study examined the preservice science teachers' understandings and their practices which include five pre-service science teachers' PCK. In this study, the participants demonstrated their PCK through the process of the training program by writing content representations (CoRes), preparing the lesson plans, micro-teaching, and actual teaching respectively. All pre-service science teachers' performs were collected by classroom observations. Then, they were interviewed. The results showed that the pre-service science teachers progressively developed knowledge components of PCK. Micro-teaching is the key activities for developing PCK. However, they had some difficulties in their classroom teaching. They required of sufficient ability to design appropriate instructional strategies and assessment activities for teaching. Blending content and pedagogy is also a matter of great concern. The implication of this study was that science educators can enhance pre-service science teachers' PCK by fostering their better understandings of the instructional strategies, assessment activities and blending between content and pedagogy in their classroom.

  15. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  16. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  17. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  18. Planning for Pre-Exascale Platform Environment (Fiscal Year 2015 Level 2 Milestone 5216)

    Energy Technology Data Exchange (ETDEWEB)

    Springmeyer, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Lang, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Noe, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-28

    This Plan for ASC Pre-Exascale Platform Environments document constitutes the deliverable for the fiscal year 2015 (FY15) Advanced Simulation and Computing (ASC) Program Level 2 milestone Planning for Pre-Exascale Platform Environment. It acknowledges and quantifies challenges and recognized gaps for moving the ASC Program towards effective use of exascale platforms and recommends strategies to address these gaps. This document also presents an update to the concerns, strategies, and plans presented in the FY08 predecessor document that dealt with the upcoming (at the time) petascale high performance computing (HPC) platforms. With the looming push towards exascale systems, a review of the earlier document was appropriate in light of the myriad architectural choices currently under consideration. The ASC Program believes the platforms to be fielded in the 2020s will be fundamentally different systems that stress ASC’s ability to modify codes to take full advantage of new or unique features. In addition, the scale of components will increase the difficulty of maintaining an errorfree system, thus driving new approaches to resilience and error detection/correction. The code revamps of the past, from serial- to vector-centric code to distributed memory to threaded implementations, will be revisited as codes adapt to a new message passing interface (MPI) plus “x” or more advanced and dynamic programming models based on architectural specifics. Development efforts are already underway in some cases, and more difficult or uncertain aspects of the new architectures will require research and analysis that may inform future directions for program choices. In addition, the potential diversity of system architectures may require parallel if not duplicative efforts to analyze and modify environments, codes, subsystems, libraries, debugging tools, and performance analysis techniques as well as exploring new monitoring methodologies. It is difficult if not impossible to

  19. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  20. Pre-Class Planning for Individualized Accounting

    Science.gov (United States)

    Clayton, Dean; Brooke, Joyce Ann

    1974-01-01

    Pre-class planning of individualized accounting is involved with goals, objectives, and activities developed and selected by the teacher in providing compatibility between accounting content and teaching strategy. A systematic arrangement of activities should be developed so that students can understand and apply accounting principles at their own…

  1. [An oral function improvement program utilizing health behavior theories ameliorates oral functions and oral hygienic conditions of pre-frail elderly persons].

    Science.gov (United States)

    Sakaguchi, Hideo

    2014-06-01

    Oral function improvement programs utilizing health behavior theories are considered to be effective in preventing the need for long-term social care. In the present study, an oral function improvement program based upon health behavior theories was designed, and its utility was assessed in 102 pre-frail elderly persons (33 males, 69 females, mean age: 76.9 +/- 5.7) considered to be in potential need of long-term social care and attending a long-term care prevention class in Sayama City, Saitama Prefecture, Japan. The degree of improvement in oral functions (7 items) and oral hygienic conditions (3 items) was assessed by comparing oral health before and after participation in the program. The results showed statistically significant improvements in the following oral functions: (1) lip functions (oral diadochokinesis, measured by the regularity of the repetition of the syllable "Pa"), (2) tongue functions, (3) tongue root motor skills (oral diadochokinesis, measured by the regularity of the repetition of the syllables "Ta" and "Ka"), (4) tongue extension/retraction, (5) side-to-side tongue movement functions, (6) cheek motor skills, and (7) repetitive saliva swallowing test (RSST). The following measures of oral hygiene also showed a statistically significant improvement: (1) debris on dentures or teeth, (2) coated tongue, and (3) frequency of oral cleaning. These findings demonstrated that an improvement program informed by health behavior theories is useful in improving oral functions and oral hygiene conditions.

  2. Hanford Site waste tank farm facilities design reconstitution program plan

    International Nuclear Information System (INIS)

    Vollert, F.R.

    1994-01-01

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980's has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan

  3. An analysis of pre-service family planning teaching in clinical and nursing education in Tanzania

    OpenAIRE

    Muganyizi, Projestine S; Ishengoma, Joyce; Kanama, Joseph; Kikumbih, Nassoro; Mwanga, Feddy; Killian, Richard; McGinn, Erin

    2014-01-01

    Background Promoting family planning (FP) is a key strategy for health, economic and population growth. Sub-Saharan Africa, with one of the lowest contraceptive prevalence and highest fertility rates globally, contributes half of the global maternal deaths. Improving the quality of FP services, including enhancing pre-service FP teaching, has the potential to improve contraceptive prevalence. In efforts to improve the quality of FP services in Tanzania, including provider skills, this study s...

  4. The Effects of Pre-Task Planning and On-line Planning on Fluency, Complexity, and Accuracy in L2 Monologic Oral Production.

    Science.gov (United States)

    Yuan, Fangyuan; Ellis, Rod

    2003-01-01

    Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…

  5. Pre-freshman enrichment program [University of New Haven

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Connecticut Pre-Engineering Program, Inc. (CPEP), is a collaboration of school districts, businesses, colleges, universities, government and community organizations whose mission and program efforts are aimed at increasing the pool of African-American, Hispanic, Native-American Indian, Asian American, Women and other under-represented minority students who pursue mathematics, science, engineering and other technological based college study and careers. CPEP provides enrichment programs and activities throughout the year in New Haven. Since 1987, CPEP has sponsored summer enrichment programs designed to motivate and stimulate middle school and high school students to pursue careers in mathematics, science, engineering and other technology related fields. Through the Summer Enrichment Program, CPEP has been able to better prepare under-represented and urban students with skills that will facilitate their accessing colleges and professionals careers. The essential premise of the program design and academic content is that targeted students must be taught and nurtured as to develop their self-confidence and personal ambitions so that they can seriously plan for and commit to college-level studies. The program stresses multi-disciplinary hands-on science and mathematics experience, group learning and research, and career exploration and academic guidance. Students study under the direction of school teachers and role model undergraduate students. Weekly field trips to industrial sites, science centers and the shoreline are included in this program.

  6. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  7. How we improved operations in drilling pre-salt wells

    Energy Technology Data Exchange (ETDEWEB)

    Hougaz, Augusto Borella [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Martins, Luiz Felipe; Bittencourt, Jessica Lima; Braz, Luciano Machado [Genesis do Brasil, Sao Paulo, SP (Brazil); Damski, Carlos [Genesis Petroleum Technology Pty Ltd. (GPT), Bentley, WA (Australia)

    2012-07-01

    The development of pre-salt wells offshore Brazil has been one of the most challenging projects in history of E and P. Facing water depths of 2000+ meters, a salt layer 2000 meters thick to reach reservoirs at 7000 meters below sea level, has to use technological and procedural techniques never used before. In those 2 years of exploration of those fields many technologies were tested and improved. This paper describes the systematic approach was taken to analyze, plan and follow-up the development of drilling operations campaign in those fields, and the case study of overall process improvement. The assumption was to apply a risk analysis tool which uses previous data to analyze the performance and plan future time. The goals of this process are continuous improvement of execution and process control for each operation. Looking into previous performance, new interventions were planned more accurately and further improvements were studied. The frequent follow up of the drilling intervention was done using the statistical base to compare the most recent results. At operational level it was possible to see if the last operation was done in the 1st, 2nd, 3rd or 4th quartile of its related statistical distribution, as well as to verify the difference within P10 and P90, which indicates the control of each operation execution process. The same process was done for some rig related operations and for the whole intervention at end of it. Close contact with the intervention progress was kept and actions taken in any major deviation from the plan. This paper describes the case study where the process control and optimization of the total time for drilling 10 wells with similar design was measured between March 2009 and May 2011. It resulted in significant improvement in the drilling process. (author)

  8. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  9. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  10. Attitudes and Motivations of Vocational Teachers Regarding Program Improvement.

    Science.gov (United States)

    Greenan, James P.; Wu, Mingchang; Mustapha, Ramlee B.; Ncube, Lisa B.

    1998-01-01

    Secondary vocational teachers in Indiana (n=186) indicated they were motivated to improve programs by concern for students, professional growth, and desire to keep current. They believed that program improvement enhances professional development, but lacked time to plan for improvement and were skeptical about administrators' ability to reduce…

  11. Multi-centre audit of VMAT planning and pre-treatment verification.

    Science.gov (United States)

    Jurado-Bruggeman, Diego; Hernández, Victor; Sáez, Jordi; Navarro, David; Pino, Francisco; Martínez, Tatiana; Alayrach, Maria-Elena; Ailleres, Norbert; Melero, Alejandro; Jornet, Núria

    2017-08-01

    We performed a multi-centre intercomparison of VMAT dose planning and pre-treatment verification. The aims were to analyse the dose plans in terms of dosimetric quality and deliverability, and to validate whether in-house pre-treatment verification results agreed with those of an external audit. The nine participating centres encompassed different machines, equipment, and methodologies. Two mock cases (prostate and head and neck) were planned using one and two arcs. A plan quality index was defined to compare the plans and different complexity indices were calculated to check their deliverability. We compared gamma index pass rates using the centre's equipment and methodology to those of an external audit (global 3D gamma, absolute dose differences, 10% of maximum dose threshold). Log-file analysis was performed to look for delivery errors. All centres fulfilled the dosimetric goals but plan quality and delivery complexity were heterogeneous and uncorrelated, depending on the manufacturer and the planner's methodology. Pre-treatment verifications results were within tolerance in all cases for gamma 3%-3mm evaluation. Nevertheless, differences between the external audit and in-house measurements arose due to different equipment or methodology, especially for 2%-2mm criteria with differences up to 20%. No correlation was found between complexity indices and verification results amongst centres. All plans fulfilled dosimetric constraints, but plan quality and complexity did not correlate and were strongly dependent on the planner and the vendor. In-house measurements cannot completely replace external audits for credentialing. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Emotionally Handicapped Pupils: Developing Appropriate Educational Programs.

    Science.gov (United States)

    North Carolina State Dept. of Public Instruction, Raleigh. Div. for Exceptional Children.

    The document is designed to assist local school systems as they plan, develop, and improve programs for emotionally handicapped students. Sections cover the following areas: definition of emotionally handicapped students; pre-planninq for emotionally handicapped programs; identification, referral, screening, assessment, and placement; service…

  13. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  14. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  15. Improving energy audit process and report outcomes through planning initiatives

    Science.gov (United States)

    Sprau Coulter, Tabitha L.

    Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first

  16. Pre-Test pan Work Plan sebagai Strategi Pembelajaran Efektif pada Praktikum Bahan Teknik Lanjut Jurusan Pendidikan Teknik Mesin FT UNY

    Directory of Open Access Journals (Sweden)

    Nurdjito Nurdjito

    2013-09-01

    Full Text Available To find the most effective learning strategy for the practicum in the laboratory of materials of the department of Mechanical Engineering Education, Faculty of Engineering, Yogyakarta State University (YSU, a study that aims to determine the effect of applying pre-test and work plan on the learning activities and the achievement of students in the laboratory was conducted. This action research used the purposive random sampling technique. Pre-test and work plan were conducted as the treatment. The data of study was collected through a test to analyse the students’ achievement scores, then they were analyzed using t-test with SPSS. The results of this study indicated that the application of pre-test and work plan in addition to the standard module was proven to be more effective than the  normative learning using the module with t = 3.055 p = 0.003 <0.05. The implementation of the pre-test and work plan in addition to the use of standard modules is able to  improve the students’ motivation, independence and readiness to learn as well as the cooperation among the students, therefore the achievement is also improved. The mastery of competencies increased significantly proved by the increasing values of mode 66 to 85 (the experiment, and mean 73.12 into 79.32 (experiment.

  17. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  18. Program planning for future improvement in managing ORNL's radioactive wastes

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This report is intended to serve as a reference document and guide in developing the long-term improvements section of ORNL's radioactive waste management plan. The report reviews ORNL's operations and future program needs in terms of currently applicable DOE regulations and also in terms of regulations and accepted practices of the commerical sector of the nuclear power industry so that the impact of potential future adoption of these regulations and standards on ORNL's operations can be fully evaluated. The principal conclusion reached after reviewing ORNL's waste management operations is that these operations are currently being conducted in a manner that does not endanger the health or safety of workers or the general public and that does not have an adverse effect on the environment. Although nineteen specific problem areas have been identified all of these problems can be attributed to one of the following: a) the legacy of past practices; b) gradual deterioration of systems which have reached (or are near to reaching) the end of their reasonable design lives; and c) potential changes in regulations applicable to ORNL. All of the programs designed to improve or correct these problem areas could be accomplished within a four year period. However, given current limitations on manpower and capital, these programs would more likely be spread out over a five to ten year period of time if they were all to be undertaken. The cost of undertaking all of these projects concurrently is estimated to be between 60 and 100 million dollars. Due to the many unknowns and uncertainties associated with the problem areas, actual total costs for specific projects could vary from those presented in this report by as much as 300 percent. (DMC)

  19. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  20. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  1. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  2. Program Planning in Health Professions Education

    Science.gov (United States)

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  3. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  4. Using Program Data to Improve Access to Family Planning and Enhance the Method Mix in Conflict-Affected Areas of the Democratic Republic of the Congo.

    Science.gov (United States)

    Ho, Lara S; Wheeler, Erin

    2018-03-21

    Unmet need for family planning in the conflict-affected area of eastern Democratic Republic of the Congo (DRC) has been reported to be as high as 38%, and women in such conflict settings are often the most at risk for maternal mortality. The International Rescue Committee implements the Family Planning and Post-Abortion Care in Emergencies program in 3 provinces of eastern DRC to provide women and couples access to family planning, including long-acting reversible contraceptives (LARCs). This article presents routine program data from June 2011 through December 2013 from 2 health zones as well as results from a qualitative assessment of family planning clients and of male and female non-users, conducted in 2013. It then describes how these findings were used to make program adjustments to improve access to family planning services and client informed choice and assesses the effects of the program design changes on family planning uptake and method mix using routine program data from January 2014 through December 2016. Between 2011 and 2013, 8,985 clients adopted family planning, with an average 14 clients adopting a method per facility, per month. The method mix remained stable during this period, with implants dominating at 48%. Barriers to uptake identified from the qualitative research were both supply- and demand-related, including misconceptions about certain modern contraceptive methods on the part of providers, users, and other community members. The program implemented several program changes based on the assessment findings, including clinical coaching and supportive supervision to improve provider skills and attitudes, introduction of immediate postpartum insertion of the intrauterine device (IUD) and the levonorgestrel-releasing intrauterine system (LNG-IUS), and behavior change communication campaigns to raise awareness about family planning. After these program changes, the mean number of clients adopting modern family planning per facility, per month

  5. Using Program Data to Improve Access to Family Planning and Enhance the Method Mix in Conflict-Affected Areas of the Democratic Republic of the Congo

    Science.gov (United States)

    Ho, Lara S; Wheeler, Erin

    2018-01-01

    Unmet need for family planning in the conflict-affected area of eastern Democratic Republic of the Congo (DRC) has been reported to be as high as 38%, and women in such conflict settings are often the most at risk for maternal mortality. The International Rescue Committee implements the Family Planning and Post-Abortion Care in Emergencies program in 3 provinces of eastern DRC to provide women and couples access to family planning, including long-acting reversible contraceptives (LARCs). This article presents routine program data from June 2011 through December 2013 from 2 health zones as well as results from a qualitative assessment of family planning clients and of male and female non-users, conducted in 2013. It then describes how these findings were used to make program adjustments to improve access to family planning services and client informed choice and assesses the effects of the program design changes on family planning uptake and method mix using routine program data from January 2014 through December 2016. Between 2011 and 2013, 8,985 clients adopted family planning, with an average 14 clients adopting a method per facility, per month. The method mix remained stable during this period, with implants dominating at 48%. Barriers to uptake identified from the qualitative research were both supply- and demand-related, including misconceptions about certain modern contraceptive methods on the part of providers, users, and other community members. The program implemented several program changes based on the assessment findings, including clinical coaching and supportive supervision to improve provider skills and attitudes, introduction of immediate postpartum insertion of the intrauterine device (IUD) and the levonorgestrel-releasing intrauterine system (LNG-IUS), and behavior change communication campaigns to raise awareness about family planning. After these program changes, the mean number of clients adopting modern family planning per facility, per month

  6. 20 CFR 632.255 - Program planning.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described in...

  7. Transportation Improvement Program of the Mid-Ohio Regional Planning Commission

    Science.gov (United States)

    1996-06-20

    The MORPC Transportation Improvement program (TIP) is a staged, multi-year schedule of regionally significant transportation improvements in the Columbus area. The Federal-aid Highway Act of 1962 and the federal Urban Mass Transportation Act of 1964 ...

  8. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  9. Multilingual Pedagogies and Pre-Service Teachers: Implementing "Language as a Resource" Orientations in Teacher Education Programs

    Science.gov (United States)

    Catalano, Theresa; Hamann, Edmund T.

    2016-01-01

    While Ruiz's (1984) influential work on language orientations has substantively influenced how we study and talk about language planning, few teacher education programs today actually embed his framework in the praxis of preparing pre-service and practicing teachers. Hence, the primary purpose of this article is to demonstrate new understandings…

  10. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  11. 75 FR 45013 - Pre-Existing Condition Insurance Plan Program

    Science.gov (United States)

    2010-07-30

    ... Department of Homeland Security's U.S. Citizenship and Immigration Services (USCIS) Systematic Alien... pre-existing condition based on evidence of the existence or history of certain medical or health...

  12. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    Science.gov (United States)

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy.

  13. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  14. Evaluation of Pre-disaster Planning of Bengawan Solo River Flood Bojonegoro Regency Year 2014

    Directory of Open Access Journals (Sweden)

    Enov Sayu Mimanggar Mirahesti

    2017-02-01

    Full Text Available Early year of 2014 flood was ranked first in the natural disasters with 69 incidences. Bengawan Solo floods is an annual natural disastersin Bojonegoro. Study’s results in 2011 showed that RHA activities was not maximum that pre-disaster activities should be evaluated. Based on management functions, planning is the very first step. Evaluation of pre-disaster planning is the earliest thing to do to minimize the disasters impact. This study aimed to evaluate activities of floods pre-disaster planning in Bojonegoro year 2014. Data were collected by interview anddocument study. Data were analyzed descriptively. The results showed that based on input components, SOP and facilities had met the standard, while the staff, the type of data, and funds had’nt metthe standard yet. Based on process component, contingency planning had been done according to the standard. Both geomedic mapping and identification of social and economic in the process of activities planning of prevention, mitigation, and disaster response preparedness actions didn’t conduct. Based on the output component, the health department already had a contingency plan, but didn’t have geomedic maps and prevention, mitigation, and disaster response preparedness actions plan. This study concluded that pre-disaster planning activities of Bojonegoro Regency Health Office wasn’t good. The suggestion given are control SOP, increase the staff amount, complete thedata types, allocate funds, make budgettaryplanning, provide vehicles, conduct identification of social and economic, give training to staffs, and make outline of the geomedicmap and prevention, mitigation, and disaster response preparedness actions plan. Keywords: planning, pre-disaster, floods

  15. Report on the Pre-existing Condition Insurance Plan Program

    Data.gov (United States)

    U.S. Department of Health & Human Services — Before the Affordable Care Act, Americans with pre-existing conditions who did not receive health coverage through their employers had few affordable options to get...

  16. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  17. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  18. Pre-Service Teachers’ Experiences during Off-Campus Observation: Basis for Improving the Roles of Teacher Education Institutions and Cooperating Schools

    Directory of Open Access Journals (Sweden)

    Maripaz C. Abas

    2016-05-01

    Full Text Available Observing experienced teachers is an indispensable part of practicum studies in teacher education.  This paper examined the perceptions of pre-service teachers from five major fields of teacher education program on their experiences during off-campus observation in selected secondary schools. This used qualitative content analysis method in order to “subjectively interpret the content of text data through the systematic classification process of coding and identifying themes or patterns” (Hsieh & Shanon, 2005 p. 1278 . Data were taken from 136 pre-service teachers  through open-ended questions and two high school principals, 10 cooperating teachers, six student supervisors and 12 pre-service teachers through Focus Group Interview (FGI and Key Informant Interview (KII. Codes and emerging themes were derived using content analysis.  Results showed 18 themes for desirable experiences and 24 themes for undesirable experiences. Pre-service teachers’ experiences mostly focused on students’ attitudes and behaviors. Suggestions to improve off-campus observation from multi-level participants of the study concentrated on preparedness,  orientation programs, supervision and monitoring,  personal attributes and roles, values, attitudes and behaviors, deployment, post conferences,  supervisory plan, observation policies and guidelines,  required documents, seminars, time management, evaluation, coordination, and cultural diversity. To sustain the desirable experiences, both cooperating teachers and student supervisors believed that their roles were to serve as model, guide, leader, monitor, planner, and motivator. The varied experiences of pre-service teachers imply that Teacher Education Institutions (TEIs and cooperating schools should provide opportunities, develop competencies, take responsibilities and strengthen partnership to enhance off-campus observation.

  19. Continual improvement plan

    Science.gov (United States)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  20. Improving productivity levels: family planning services for factory workers.

    Science.gov (United States)

    Darmokusumo, H V

    1989-10-01

    In May 1984, the Minister of Manpower in Indonesia, the Chairman of the BKKBN, and representatives of the employers' and workers' organizations of Indonesia issued a joint decree pledging that they would work together to enhance the implementation of the family planning program among workers in the organized sector. 1 objective of the decree is to improve workers' productivity and the standard of living of workers and their families by implementing a family planning program. 1 baseline survey and a clinic-based survey in 5 provinces revealed that 90% of women workers are between 21-40, or are of reproductive age, and are sexually active. Only about 50% are practicing family planning; the other 50% are afraid to practice family planning due to potential side effects of various methods. This fear was most often caused by negative rumors spread by unsatisfied family planning clients. Placing materials for family planning promotion such as instructional posters and video programs advertising contraceptive services in the work setting may increase knowledge and help alleviate some of this fear. Other studies of family planning services show that employees prefer female medical doctors or midwives as service providers, employees are willing to pay for services (but can only afford a small fee), and family planning service points should be near employees' work sites.

  1. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  2. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  3. Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

  4. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  5. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  6. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  7. The PrePex device is unlikely to achieve cost-savings compared to the forceps-guided method in male circumcision programs in sub-Saharan Africa.

    Directory of Open Access Journals (Sweden)

    Walter Obiero

    Full Text Available Male circumcision (MC reduces the risk of heterosexual HIV acquisition in men by approximately 60%. MC programs for HIV prevention are currently being scaled-up in fourteen countries in sub-Saharan Africa. The current standard surgical technique for MC in many sub-Saharan African countries is the forceps-guided male circumcision (FGMC method. The PrePex male circumcision (PMC method could replace FGMC and potentially reduce MC programming costs. We compared the potential costs of introducing the PrePex device into MC programming to the cost of the forceps-guided method.Data were obtained from the Nyanza Reproductive Health Society (NRHS, an MC service delivery organization in Kenya, and from the Kenya Ministry of Health. Analyses are based on 48,265 MC procedures performed in four Districts in western Kenya from 2009 through 2011. Data were entered into the WHO/UNAIDS Decision Makers Program Planning Tool. The tool assesses direct and indirect costs of MC programming. Various sensitivity analyses were performed. Costs were discounted at an annual rate of 6% and are presented in United States Dollars.Not including the costs of the PrePex device or referral costs for men with phimosis/tight foreskin, the costs of one MC surgery were $44.54-$49.02 and $54.52-$55.29 for PMC and FGMC, respectively.The PrePex device is unlikely to result in significant cost-savings in comparison to the forceps-guided method. MC programmers should target other aspects of the male circumcision minimum package for improved cost efficiency.

  8. Career/Vocational Preparation for Students with Disabilities: A Program Improvement Guide.

    Science.gov (United States)

    Stodden, Robert A.

    This program improvement guide is designed to assist district and school level interdisciplinary planning teams to improve career/vocational programs for students with disabilities. Its focus is on the integration of best practices within the educational program continuum to achieve positive student outcomes. The guide includes three sections.…

  9. Minority Pre-service Teachers' and Faculty Training on Climate Change Education in Delaware State University

    Science.gov (United States)

    Ozbay, G.; Fox-Lykens, R.; Veron, D. E.; Rogers, M.; Merrill, J.; Harcourt, P.; Mead, H.

    2015-12-01

    Delaware State University is working toward infusing undergraduate education with climate change science and enhancing the climate change learning content of pre-service teacher preparation programs as part of the MADE-CLEAR project (www.madeclear.org). Faculty development workshops have been conducted to prepare and educate a cadre of faculty from different disciplines in global climate science literacy. Following the workshops, the faculty participants have integrated climate literacy tenets into their existing curriculum. Follow up meetings have helped the faculty members to use specific content in their curriculum such as greenhouse gases, atmospheric CO2, sea level rise, etc. Additional training provided to the faculty participants in pedagogical methods of climate change instruction to identify common misconceptions and barriers to student understanding. Some pre-service teachers were engaged in summer internships and learned how to become messenger of climate change science by the state parks staff during the summer. Workshops were offered to other pre-service teachers to teach them specific climate change topics with enhanced hands-on laboratory activities. The participants were provided examples of lesson plans and guided to develop their own lesson plans and present them. Various pedagogical methods have been explored for teaching climate change content to the participants. The pre-service teachers found the climate content very challenging and confusing. Training activities were modified to focus on targeted topics and modeling of pedagogical techniques for the faculty and pre-service teachers. Program evaluation confirms that the workshop participant show improved understanding of the workshop materials by the participants if they were introduced few climate topics. Learning how to use hands-on learning tools and preparing lesson plans are two of the challenges successfully implemented by the pre-service teachers. Our next activity includes pre

  10. Intertechnology Corporation proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-09-01

    This report has three major parts. The first of these derives the requirements for the Test and Evaluation plan from the System Level Plan which is summarized in Section II. The second part contains the proposed plan to fill these requirements and includes hardware and software recommendations as well as procedures and management considerations. Primary emphasis has been given to the remote site because this is the area in which the commercial part of the demonstration is most unique. Finally, some pre-demonstration activities are described. The pilot program is intended to resolve a number of issues which arose in the course of the T and E plan. These relate to choice of scan frequencies, compression algorithms, etc. It is also intended to confirm performance and cost effectiveness of the site data collection package. The base line measurements of attitudes, etc. provide a reference mark against which one can measure the non-technical effectiveness of the demonstration program. (WDM)

  11. Site Support Program Plan Infrastructure Program

    International Nuclear Information System (INIS)

    1995-01-01

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site's infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford's infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition

  12. Nuclear Regulatory Commission staff approaches to improving the integration of regulatory guidance documents and prelicensing reviews

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-01-01

    The Nuclear Regulatory Commission staff is conducting numerous activities to improve the integration of its regulatory guidance documents (i.e., License Application Review Plan (LARP) and open-quotes Format and Content for the License Application for the High-Level Waste repositoryclose quotes (FCRG)) and pre-license application (LA) reviews. Those activities related to the regulatory guidance documents consist of: (1) developing an hierarchy of example evaluation findings for LARP; (2) identifying LARP review plan interfaces; (3) conducting an integration review of LARP review strategies; (4) correlating LARP to the ongoing technical program; and (5) revising the FCRG. Some of the more important strategies the staff is using to improve the integration of pre-LA reviews with the LA review include: (1) use of the draft LARP to guide the staff's pre-LA reviews; (2) focus detailed pre-LA reviews on key technical uncertainties; (3) identify and track concerns with DOE's program; and (4) use results of pre-LA reviews in LA reviews. The purpose of this paper is to describe these ongoing activities and strategies and discuss some of the new work that is planned to be included in LARP Revision 1 and the final FCRG, which are scheduled to be issued in late 1994. These activities reflect both the importance the staff has placed on integration and the staff's approach to improving integration in these areas. The staff anticipates that the results of these activities, when incorporated in the FCRG, LARP, and pre-LA reviews, will improve its guidance for DOE's ongoing site characterization program and LA annotated outline development

  13. 77 FR 52614 - Pre-Existing Condition Insurance Plan Program

    Science.gov (United States)

    2012-08-30

    ... program, program benefits, program oversight, program funding, coordination with state laws and programs... relief from removal by exercising deferred action on a case-by-case basis with respect to certain... of Homeland Security Janet Napolitano, at: http://www.dhs.gov/xlibrary/assets/s1-exercising...

  14. LANDSCAPE PLANNING IN UKRAINE: THE FIRST LANDSCAPE-PLANNING PROGRAM

    Directory of Open Access Journals (Sweden)

    Leonid Rudenko

    2013-01-01

    Full Text Available The paper presents the results of the first, in Ukraine; project on landscape planning widely accepted in European countries. Under the project implemented in 2010–2013, a landscape-planning program has been developed for the Cherkassy oblast. This is the first document of this kind in Ukraine. The program is mainly based on the experience of the German and Russian schools of landscape planning and on research and assessment conducted by the authors, which allowed identifying approaches to landscape planning, principles of the national policy, and characteristics and potential of environmentally friendly planning in Ukraine. The paper discusses the main phases of the work on the development of the landscape program for the oblast. It also identifies the main stages and key concepts and principles of landscape planning. The paper presents the results of integrated research on the identification and classification of conflicts in land use and the integral concept of the developmental goals for the oblast. The results can be the foundation for adopting management decisions and development of action plans for the lower hierarchal branches.

  15. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  16. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  17. Multiyear Program Plan for the High Temperature Materials Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  18. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  19. Improving MC and A Oversight in Russia by Implementing Measurement and Training Programs

    International Nuclear Information System (INIS)

    Bokov, Dmitry; Byers, Kenneth R.

    2004-01-01

    As the Russian State regulatory agency responsible for oversight of nuclear material control and accounting (MC and A), Gosatomnadzor of Russia (GAN) determines the status of the MC and A programs at Russian facilities. Last year, GAN developed and implemented their Nuclear Material Measurement Program Plan which documents current non-destructive assay (NDA) measurement capability in all regions of GAN; provides justification for upgrades to equipment, procedures and training; and defines the inspector-facility operator interface as it relates to NDA measurement equipment use. This Program Plan has helped to give the GAN inspection measurements more legal and official status as an oversight tool, and has also helped to improve other GAN MC and A oversight activities. These improvements include developing a tamper-indicating device program, conducting NDA workshops at specific Russian nuclear facilities to better train MC and A inspectors, and developing training evaluation programs. The Program is an important tool to address the GAN role in oversight of the Russian Federal Information System nuclear material database. This paper describes the feedback received from the GAN regional offices on the implementation of the Program Plan during its first year in operation and how the Program Plan has affected other GAN inspection activities to improve MC and A oversight.

  20. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  1. Site Support Program Plan Infrastructure Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  2. Assessment of existing local houses condition as analysis tools for shore housing improvement program in Weriagar district, Bintuni Bay

    Science.gov (United States)

    Firmansyah, F.; Fernando, A.; Allo, I. P. R.

    2018-01-01

    The housing assessment is a part of the pre-feasibility study inThe Shore Housing Improvement Program in Weriagar District, West Papua. The housing assessment was conducted to identify the physical condition of existing houses. The parameters of assessment formulated from local references, practices and also national building regulation that covers each building system components, such as building structure/frame, building floor, building cover, and building roof. This study aims to explains lessons from local practices and references, used as the formula to generate assessment parameter, elaborate with Indonesia building regulation. The result of housing assessment were used as a basis to develop the house improvement strategy, the design alternative for housing improvement and further planning recommendations. The local knowledges involved in housing improvement program expected that the local-based approach could respect to the local build culture, respect the local environment, and the most important can offer best suitable solutions for functional utility and livability.

  3. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  4. Effect of a comprehensive health education program on pre-hospital delay intentions in high-risk stroke population and caregivers.

    Science.gov (United States)

    Yang, Li; Zhao, Qiuli; Zhu, Xuemei; Shen, Xiaoying; Zhu, Yulan; Yang, Liu; Gao, Wei; Li, Minghui

    2017-08-01

    Many factors influence pre-hospital delays in the event of stroke. This study aimed to develop and evaluate a comprehensive educational program for decreasing pre-hospital delays in high-risk stroke population. We enrolled 220 high-risk stroke population and caregivers from six urban communities in Harbin from May 2013 to May 2015, and randomly divided them into intervention and control groups. We implemented a comprehensive educational program (intervention group), comprising public lectures, instructional brochures, case videos, simulations, and role-playing from May 2013 to May 2015. We delivered conventional oral education in the control group. We compared stroke pre-hospital delay behavioral intention (SPDBI), pre-hospital stroke symptom coping test (PSSCT), and stroke pre-symptoms alert test (SPSAT) results between the groups before and 6, 12, and 18 months after health intervention. There were significant differences between before and after intervention (P educational program was significantly effective in decreasing SPDBI, improving knowledge, enhancing stroke pre-symptoms alert, and reducing the possibility of pre-hospital delays.

  5. Campus Partnerships Improve Impact Documentation of Nutrition Programs

    Science.gov (United States)

    Brinkman, Patricia

    2015-01-01

    Partnerships with other campus college units can provide ways of improving Extension's impact documentation. Nutrition programs have relied upon knowledge gained and people's self report of behavior change. Partnering with the College of Nursing, student nurses provided blood screenings during the pre and 6 month follow-up of a pilot heart risk…

  6. An assessment of time involved in pre-test case review and counseling for a whole genome sequencing clinical research program.

    Science.gov (United States)

    Williams, Janet L; Faucett, W Andrew; Smith-Packard, Bethanny; Wagner, Monisa; Williams, Marc S

    2014-08-01

    Whole genome sequencing (WGS) is being used for evaluation of individuals with undiagnosed disease of suspected genetic origin. Implementing WGS into clinical practice will place an increased burden upon care teams with regard to pre-test patient education and counseling about results. To quantitate the time needed for appropriate pre-test evaluation of participants in WGS testing, we documented the time spent by our clinical research group on various activities related to program preparation, participant screening, and consent prior to WGS. Participants were children or young adults with autism, intellectual or developmental disability, and/or congenital anomalies, who have remained undiagnosed despite previous evaluation, and their biologic parents. Results showed that significant time was spent in securing allocation of clinical research space to counsel participants and families, and in acquisition and review of participant's medical records. Pre-enrollment chart review identified two individuals with existing diagnoses resulting in savings of $30,000 for the genome sequencing alone, as well as saving hours of personnel time for genome interpretation and communication of WGS results. New WGS programs should plan for costs associated with additional pre-test administrative planning and patient evaluation time that will be required to provide high quality care.

  7. DEVELOPING VENDOR IMPROVEMENT PROGRAM IN MALAYSIA AUTOMOTIVE COMPANY

    Directory of Open Access Journals (Sweden)

    SHUKRIAH ABDULLAH

    2016-04-01

    Full Text Available Improvement Program seek to do evaluation well, request to become sufficiently versed in evaluation or to integrate on improvement perspective in all phase of performance, from needs assessment to implementation and evaluation itself. The purpose of this program in the automotive company is to assist vendor as global manufacturer in preparation towards ASEAN Free Trade Agreement (AFTA 2015. This development vendor improvement program emphasize on the downtime reduction to below 200 minutes per month with the ultimate end of improving not only program or solutions but also the organizations and customer. A practical approach either planned or unplanned by the automotive company require policies and procedures that address the same consideration on the downtime identification. 20 top bottom rank vendor were determined based on the downtime performance, followed by classification into different group based on severity. To execute the vendor improvement program three among 20 top bottom rank vendors were selected due to willingness to participate and ease of data access in the program. Selected vendors have high ranking in terms of downtime. The case study method involved an interview and plant observation. The used of secondary data from the automotive company, and previous researcher are also utilised. This improvement program assists the automobile manufacturer to improve its supplier’s performance. The vendor improvement program is implemented through a whole supplier operation assessment.

  8. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  9. Planning JWST NIRSpec MSA spectroscopy using NIRCam pre-images

    Science.gov (United States)

    Beck, Tracy L.; Ubeda, Leonardo; Kassin, Susan A.; Gilbert, Karoline; Karakla, Diane M.; Reid, I. N.; Blair, William P.; Keyes, Charles D.; Soderblom, D. R.; Peña-Guerrero, Maria A.

    2016-07-01

    The Near-Infrared Spectrograph (NIRSpec) is the work-horse spectrograph at 1-5microns for the James Webb Space Telescope (JWST). A showcase observing mode of NIRSpec is the multi-object spectroscopy with the Micro-Shutter Arrays (MSAs), which consist of a quarter million tiny configurable shutters that are 0. ''20×0. ''46 in size. The NIRSpec MSA shutters can be opened in adjacent rows to create flexible and positionable spectroscopy slits on prime science targets of interest. Because of the very small shutter width, the NIRSpec MSA spectral data quality will benefit significantly from accurate astrometric knowledge of the positions of planned science sources. Images acquired with the Hubble Space Telescope (HST) have the optimal relative astrometric accuracy for planning NIRSpec observations of 5-10 milli-arcseconds (mas). However, some science fields of interest might have no HST images, galactic fields can have moderate proper motions at the 5mas level or greater, and extragalactic images with HST may have inadequate source information at NIRSpec wavelengths beyond 2 microns. Thus, optimal NIRSpec spectroscopy planning may require pre-imaging observations with the Near-Infrared Camera (NIRCam) on JWST to accurately establish source positions for alignment with the NIRSpec MSAs. We describe operational philosophies and programmatic considerations for acquiring JWST NIRCam pre-image observations for NIRSpec MSA spectroscopic planning within the same JWST observing Cycle.

  10. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  11. Improved operational performance through the use of business planning tools

    International Nuclear Information System (INIS)

    Hoelscher, H.L.

    1996-01-01

    Improved operational performance at Point Beach Nuclear Plant is based on a focused business plan. Quantitative goals that compare past performance with the performance of potential competitors are the basis of the business plan. This establishes goals for the nuclear power business unit which support corporate goals. Strategies and objectives are then developed to meet the established goals. To continue support for these strategies and objectives, individual performance plans are developed for all management personnel. These performance management plans identify individual contributor actions to support the goals, and also provide periodic feedback for changes to better prioritize individual actions. Performance criteria are also established to measure progress toward achieving the goals. The author also has a program to provide incentives for improved performance based upon success of the organization in achieving established goals

  12. Pre-surgical planning and MR-tractography utility in brain tumour resection

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A.; Fantozzi, L.M.; Bozzao, A. [University Sapienza, Department of Neuroradiology, S. Andrea Hospital, Rome (Italy); D' Andrea, G.; Mastronardi, L.; Ferrante, L. [University Sapienza, Department of Neurosurgery, S. Andrea Hospital, Rome (Italy); Minniti, G. [University Sapienza, Department of Radiotherapy, S. Andrea Hospital, Rome (Italy)

    2009-12-15

    The purposes of this study were (1) to evaluate the possible identification of trajectories of fibre tracts, (2) to examine the useful of a neuronavigation system for pre-surgical planning, (3) to assess pre- and post-surgery patients' clinical condition and (4) to evaluate the impact of this information on surgical planning and procedure. Twenty-eight right-handed patients were prospectively and consecutively studied. All the patients were clinically assessed by a neurologist in both pre- and post-surgical phases. Separately the pyramidal tract, optic radiation and arcuate fasciculus were reconstructed. The trajectories were considered suitable for surgical planning if there were no interruptions of any of the layers at the level of the lesion. Dedicated software 'merged' the acquired images with the tractographic processing, and the whole dataset was sent to the neuronavigation system. The assessment of the 37 visualised trajectories close to the tumour resulted in a modification of the surgical approach to corticotomy in six patients (21%); the impact on the definition of the resection margins during surgery was 64% (18 cases). The overall impact percentage on the surgical procedure was 82%. In 27 cases, the symptoms had not changed. MR-tractography provides the neurosurgeon with a new anatomical view that has an impact on the surgical resection planning for brain neoplasms. (orig.)

  13. Pre-surgical planning and MR-tractography utility in brain tumour resection

    International Nuclear Information System (INIS)

    Romano, A.; Fantozzi, L.M.; Bozzao, A.; D'Andrea, G.; Mastronardi, L.; Ferrante, L.; Minniti, G.

    2009-01-01

    The purposes of this study were (1) to evaluate the possible identification of trajectories of fibre tracts, (2) to examine the useful of a neuronavigation system for pre-surgical planning, (3) to assess pre- and post-surgery patients' clinical condition and (4) to evaluate the impact of this information on surgical planning and procedure. Twenty-eight right-handed patients were prospectively and consecutively studied. All the patients were clinically assessed by a neurologist in both pre- and post-surgical phases. Separately the pyramidal tract, optic radiation and arcuate fasciculus were reconstructed. The trajectories were considered suitable for surgical planning if there were no interruptions of any of the layers at the level of the lesion. Dedicated software 'merged' the acquired images with the tractographic processing, and the whole dataset was sent to the neuronavigation system. The assessment of the 37 visualised trajectories close to the tumour resulted in a modification of the surgical approach to corticotomy in six patients (21%); the impact on the definition of the resection margins during surgery was 64% (18 cases). The overall impact percentage on the surgical procedure was 82%. In 27 cases, the symptoms had not changed. MR-tractography provides the neurosurgeon with a new anatomical view that has an impact on the surgical resection planning for brain neoplasms. (orig.)

  14. Multiyear Program Plan for the High Temperature Materials Laboratory; FINAL

    International Nuclear Information System (INIS)

    Arvid E. Pasto

    2000-01-01

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO(sub x) and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required

  15. A Solid Foundation: Key Capacities of Construction Pre-Apprenticeship Programs

    Science.gov (United States)

    Helmer, Matt; Blair, Amy; Gerber, Allison

    2012-01-01

    This publication shares research from site visits conducted to construction pre-apprenticeship programs in Baltimore, Hartford, Milwaukee and Portland (OR). Findings from the site visits, which included interviews and focus groups with pre-apprenticeship program staff, public officials, philanthropic leaders, construction industry leaders and…

  16. Pre-task music improves swimming performance.

    Science.gov (United States)

    Smirmaul, B P; Dos Santos, R V; Da Silva Neto, L V

    2015-12-01

    The purpose of this study was to investigate the effects of pre-task music on swimming performance and other psychological variables. A randomized counterbalanced within-subjects (experimental and control condition) design was employed. Eighteen regional level male swimmers performed two 200-m freestyle swimming time trials. Participants were exposed to either 5 minutes of self-selected music (pre-task music condition) or 5 minutes of silence (control condition) and, after 1 minute, performed the swimming task. Swimming time was significantly shorter (-1.44%) in the pre-task music condition. Listening to pre-task music increased motivation to perform the swimming task, while arousal remained unchanged. While fatigue increased after the swimming task in both conditions, vigor, ratings of perceived exertion and affective valence were unaltered. It is concluded, for the first time, that pre-task music improves swimming performance.

  17. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  18. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  19. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  20. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Science.gov (United States)

    2011-02-09

    ... Plan Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Program implementation with request for comments. SUMMARY: SBA is introducing a new Dealer Floor Plan Pilot Program to make... Plan Pilot Program was created in the Small Business Jobs Act of 2010. Under the new Dealer Floor Plan...

  1. Islamic Pre-School Management and Its Implications towards Students’ Learning Quality Improvement

    Directory of Open Access Journals (Sweden)

    Rosniati Hakim

    2016-07-01

    Full Text Available Islamic education in schools had not completely assessed the development of students’ character and personality. Therefore, additional religious education through non-formal education and religious practices were needed in Islamic Pre-Schools. It provided a forum to foster, develop, cultivate, and transform the religious value of the students to improve their personality. The purpose of this research was to examine social phenomenon that occur naturally through the facts related to management activities of students. Qualitative research was used in this study where the data taken from head of Islamic pre-school and the school deputy, teacher, staffs, mosque administrators of Baitul Haadi, administrator of the school, staffs of Ministry of Religious Affairs as well as Islamic pre-school inspectors, parents, community leaders, and administrators of professional organizations. The finding showed that students’ management applied in Islamic pre-school through the management functions is able to provide the successful of student’s education and learning implementation. It was also found that student management applied in Islamic pre-school is planning activities of students’ admission process through the administration regularly with various regulations related to the success of education. Thus, it is expected that the government will provide the guidance and implement constant supervision in accordance with applicable regulations.

  2. Performance Demonstration Program Plan for the WIPP Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-02-01

    The Performance Demonstration Program is designed to ensure that compliance with the Quality Assurance Objective, identified in the Quality Assurance Program Plan for the WIPP Experimental-Waste Characterization Program (QAPP), is achieved. This Program Plan is intended for use by the WPO to assess the laboratory support provided for the characterization of WIPP TRU waste by the storage/generator sites. Phase 0 of the Performance Demonstration Program encompasses the analysis of headspace gas samples for inorganic and organic components. The WPO will ensure the implementation of this plan by designating an independent organization to coordinate and provide technical oversight for the program (Program Coordinator). Initial program support, regarding the technical oversight and coordination functions, shall be provided by the USEPA-ORP. This plan identifies the criteria that will be used for the evaluation of laboratory performance, the responsibilities of the Program Coordinator, and the responsibilities of the participating laboratories. 5 tabs

  3. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  4. FY85 Program plan for the Defense Transuranic Waste Program (DTWP)

    International Nuclear Information System (INIS)

    1984-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY85 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research and Development (R and D), the organizational interfaces and communication channels for R and D and the establishment of procedures for planning, reporting, and budgeting of all R and D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. The work breakdown structure is reflected graphically immediately following the Administration section and is described in the subsequent narrative. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY85; outyear budget projections are presented for future years

  5. Motivation for Evaluation: A roadmap for Improving Program Efficacy

    Science.gov (United States)

    Taber, J. J.; Bohon, W.; Bravo, T. K.; Dorr, P. M.; Hubenthal, M.; Johnson, J. A.; Sumy, D. F.; Welti, R.; Davis, H. B.

    2016-12-01

    Over the past year, the Incorporated Research Institutions for Seismology (IRIS) Education and Public Outreach (EPO) program has undertaken a new effort to increase the rigor with which it evaluates its programs and products. More specifically we sought to make evaluation an integral part of our EPO staff's work, enable staff to demonstrate why we do the activities we do, enhance the impact or our products and programs, and empower staff to be able to make evidence-based claims. The challenges we faced included a modest budget, finding an applicable approach to both new and legacy programs ranging from formal and informal education to public outreach, and implementing the process without overwhelming staff. The Collaborative Impact Analysis Method (IAM; Davis and Scalice, 2015) was selected as it allowed us to combine the EPO staff's knowledge of programs, audiences and content with the expertise of an outside evaluation expert, through consultations and a qualitative rubric assessing the initial state of each product/program's evaluation. Staff then developed action plans to make incremental improvements to the evaluation of programs over time. We have found that this approach promotes the development of staff knowledge and skills regarding evaluation, provides a common language among staff, increases enthusiasm to collect and share data, encourages discussions of evaluative approaches when planning new activities, and improves each program's ability to capture the intended and unintended effects on the behaviors, attitudes, skills, interests, and/or knowledge of users/participants. We will share the initial IAM Scores for products and programs in the EPO portfolio, along with examples of the action plans for several key products and programs, and the impact that implementing those actions plans has had on our evaluations. Davis, H. & Scalice, D. (2015). Evaluate the Impact of your Education and Outreach Program Using the Quantitative Collaborative Impact Analysis

  6. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  7. "I sleep better at night:" How peer review of radiation treatment plans indirectly improves quality of care across radiation treatment programs.

    Science.gov (United States)

    Brundage, Michael D; Hart, Margaret; O'Donnell, Jennifer; Reddeman, Lindsay; Gutierrez, Eric; Foxcroft, Sophie; Warde, Padraig

    Peer review of radiation oncology treatment plans is increasingly recognized as an important component of quality assurance in radiation treatment planning and delivery. Peer review of treatment plans can directly improve the quality of those plans and can also have indirect effects on radiation treatment programs. We undertook a systematic, qualitative approach to describing the indirect benefits of peer review, factors that were seen to facilitate or act as barriers to the implementation of peer review, and strategies to address these barriers across a provincial jurisdiction of radiation oncology programs (ROPs). Semistructured qualitative interviews were held with radiation oncology department heads and radiation therapy managers (or delegates) in all 14 ROPs in Ontario, Canada. We used a theoretically guided phenomenological qualitative approach to design and analyze the interview content. Themes were recorded by 2 independent reviewers, and any discordance was resolved by consensus. A total of 28 interviews were completed with 32 interviewees. Twenty-two unique themes addressed perceived benefits of peer review, relating to either peer review structure (n = 3), process (n = 9), or outcome (n = 10). Of these 22 themes, 19 related to indirect benefits to ROPs. In addition, 18 themes related to factors that facilitated peer review activities and 30 themes related to key barriers to implementing peer review were identified. Findings were consistent with, and enhanced the understanding of, previous survey-based assessments of the benefits and challenges of implementing peer review programs. Although challenges and concerns regarding the implementation of peer review were evident, the indirect benefits to radiation programs are numerous, far outweigh the implementation challenges, and strongly complement the direct individual-patient benefits that result from peer review quality assurance of radiation treatment plans. Copyright © 2016. Published by Elsevier Inc.

  8. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  9. Performance-based planning and programming guidebook.

    Science.gov (United States)

    2013-09-01

    "Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...

  10. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  11. Quality planning and executive force of program files in quality management

    International Nuclear Information System (INIS)

    Sun Danyu

    2008-01-01

    This paper discussed the quality planning in quality management. In the quality planning, the quality objectives, the quality liabilities and the procedures shall be developed, grading supervise shall be exercised, quality assurance program shall be established, and requirements on resource and documents shall be defined. At the same time, we shall also intensify and enhance the execute force of program documentation, supervise and inspect the implementation result, establish detailed check indicators, and bring up the requirement on how to improve the quality of products. (author)

  12. Targeting utility customers to improve energy savings from conservation and efficiency programs

    International Nuclear Information System (INIS)

    Taylor, Nicholas W.; Jones, Pierce H.; Kipp, M. Jennison

    2014-01-01

    Highlights: • Improving DSM program impacts by targeting high energy users. • DSM energy savings potential hinges on pre-participation performance. • Targeting can benefit different utilities and energy efficiency programs. • Overall performance can be improved by up to 250% via targeting strategies. - Abstract: Electric utilities, government agencies, and private interests in the US have committed and continue to invest substantial resources – including billions of dollars of financial capital – in the pursuit of energy efficiency and conservation through demand-side management (DSM) programs. While most of these programs are deemed to be cost effective, and therefore in the public interest, opportunities exist to improve cost effectiveness by targeting programs to those customers with the greatest potential for energy savings. This article details an analysis of three DSM programs offered by three Florida municipal electric utilities to explore such opportunities. First, we estimate programs’ energy savings impacts; second, we measure and compare energy savings across subgroups of program participants as determined by their pre-intervention energy performance, and third, we explore potential changes in program impacts that might be realized by targeting specific customers for participation in the DSM programs. All three programs resulted in statistically significant average (per-participant) energy savings, yet average savings varied widely, with the customers who performed best (i.e., most efficient) before the intervention saving the least energy and those who performed worst (i.e., least efficient) before the intervention saving the most. Assessment of alternative program participation scenarios with varying levels of customer targeting suggests that program impacts could be increased by as much as 80% for a professional energy audit program, just over 100% for a high-efficiency heat pump upgrade program, and nearly 250% for an attic insulation

  13. Evaluation of the Navy Master Planning Program

    Science.gov (United States)

    1976-05-01

    Navy planning directives, interviews with Navy planning personnel, researc " of applicable literature on planning and program evaluation, and the...master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63

  14. VA residential substance use disorder treatment program providers' perceptions of facilitators and barriers to performance on pre-admission processes.

    Science.gov (United States)

    Ellerbe, Laura S; Manfredi, Luisa; Gupta, Shalini; Phelps, Tyler E; Bowe, Thomas R; Rubinsky, Anna D; Burden, Jennifer L; Harris, Alex H S

    2017-04-04

    In the U.S. Department of Veterans Affairs (VA), residential treatment programs are an important part of the continuum of care for patients with a substance use disorder (SUD). However, a limited number of program-specific measures to identify quality gaps in SUD residential programs exist. This study aimed to: (1) Develop metrics for two pre-admission processes: Wait Time and Engagement While Waiting, and (2) Interview program management and staff about program structures and processes that may contribute to performance on these metrics. The first aim sought to supplement the VA's existing facility-level performance metrics with SUD program-level metrics in order to identify high-value targets for quality improvement. The second aim recognized that not all key processes are reflected in the administrative data, and even when they are, new insight may be gained from viewing these data in the context of day-to-day clinical practice. VA administrative data from fiscal year 2012 were used to calculate pre-admission metrics for 97 programs (63 SUD Residential Rehabilitation Treatment Programs (SUD RRTPs); 34 Mental Health Residential Rehabilitation Treatment Programs (MH RRTPs) with a SUD track). Interviews were then conducted with management and front-line staff to learn what factors may have contributed to high or low performance, relative to the national average for their program type. We hypothesized that speaking directly to residential program staff may reveal innovative practices, areas for improvement, and factors that may explain system-wide variability in performance. Average wait time for admission was 16 days (SUD RRTPs: 17 days; MH RRTPs with a SUD track: 11 days), with 60% of Veterans waiting longer than 7 days. For these Veterans, engagement while waiting occurred in an average of 54% of the waiting weeks (range 3-100% across programs). Fifty-nine interviews representing 44 programs revealed factors perceived to potentially impact performance in

  15. Budget Impact of a Comprehensive Nutrition-Focused Quality Improvement Program for Malnourished Hospitalized Patients.

    Science.gov (United States)

    Sulo, Suela; Feldstein, Josh; Partridge, Jamie; Schwander, Bjoern; Sriram, Krishnan; Summerfelt, Wm Thomas

    2017-07-01

    Nutrition interventions can alleviate the burden of malnutrition by improving patient outcomes; however, evidence on the economic impact of medical nutrition intervention remains limited. A previously published nutrition-focused quality improvement program targeting malnourished hospitalized patients showed that screening patients with a validated screening tool at admission, rapidly administering oral nutritional supplements, and educating patients on supplement adherence result in significant reductions in 30-day unplanned readmissions and hospital length of stay. To assess the potential cost-savings associated with decreased 30-day readmissions and hospital length of stay in malnourished inpatients through a nutrition-focused quality improvement program using a web-based budget impact model, and to demonstrate the clinical and fiscal value of the intervention. The reduction in readmission rate and length of stay for 1269 patients enrolled in the quality improvement program (between October 13, 2014, and April 2, 2015) were compared with the pre-quality improvement program baseline and validation cohorts (4611 patients vs 1319 patients, respectively) to calculate potential cost-savings as well as to inform the design of the budget impact model. Readmission rate and length-of-stay reductions were calculated by determining the change from baseline to post-quality improvement program as well as the difference between the validation cohort and the post-quality improvement program, respectively. As a result of improved health outcomes for the treated patients, the nutrition-focused quality improvement program led to a reduction in 30-day hospital readmissions and length of stay. The avoided hospital readmissions and reduced number of days in the hospital for the patients in the quality improvement program resulted in cost-savings of $1,902,933 versus the pre-quality improvement program baseline cohort, and $4,896,758 versus the pre-quality improvement program in the

  16. Using Iterative Plan-Do-Study-Act Cycles to Improve Teaching Pedagogy.

    Science.gov (United States)

    Murray, Elizabeth J

    2018-01-15

    Most students entering nursing programs today are members of Generation Y or the Millennial generation, and they learn differently than previous generations. Nurse educators must consider implementing innovative teaching strategies that appeal to the newest generation of learners. The Plan-Do-Study-Act cycle is a framework that can be helpful when planning, assessing, and continually improving teaching pedagogy. This article describes the use of iterative Plan-Do-Study-Act cycles to implement a change in teaching pedagogy.

  17. Children's Kindergarten Outcomes and Program Quality in the North Carolina Pre-Kindergarten Program: 2013-2014 Statewide Evaluation

    Science.gov (United States)

    Peisner-Feinberg, Ellen S.; Schaaf, Jennifer M.; Hildebrandt, Lisa M.; Pan, Yi; Warnaar, Bethany L.

    2015-01-01

    The 2013-2014 North Carolina Pre-Kindergarten (NC Pre-K) Evaluation study was designed to examine the longitudinal outcomes through kindergarten for children who attended the Pre-K program, along with comparisons to previous cohorts of program attendees. A sample of 561 children was included in the study, with data gathered at the beginning and…

  18. The Philippine Population Program strategic plan (1981-1985).

    Science.gov (United States)

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.

  19. Subseabed-disposal program: systems-analysis program plan

    International Nuclear Information System (INIS)

    Klett, R.D.

    1981-03-01

    This report contains an overview of the Subseabed Nuclear Waste Disposal Program systems analysis program plan, and includes sensitivity, safety, optimization, and cost/benefit analyses. Details of the primary barrier sensitivity analysis and the data acquisition and modeling cost/benefit studies are given, as well as the schedule through the technical, environmental, and engineering feasibility phases of the program

  20. Single Shell Tank (SST) Program Plan

    International Nuclear Information System (INIS)

    HAASS, C.C.

    2000-01-01

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000

  1. Single Shell Tank (SST) Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    HAASS, C.C.

    2000-03-21

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000.

  2. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    Science.gov (United States)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  3. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  4. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  5. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  6. Continuous quality improvement program for hip and knee replacement.

    Science.gov (United States)

    Marshall, Deborah A; Christiansen, Tanya; Smith, Christopher; Squire Howden, Jane; Werle, Jason; Faris, Peter; Frank, Cy

    2015-01-01

    Improving quality of care and maximizing efficiency are priorities in hip and knee replacement, where surgical demand and costs increase as the population ages. The authors describe the integrated structure and processes from the Continuous Quality Improvement (CQI) Program for Hip and Knee Replacement Surgical Care and summarize lessons learned from implementation. The Triple Aim framework and 6 dimensions of quality care are overarching constructs of the CQI program. A validated, evidence-based clinical pathway that measures quality across the continuum of care was adopted. Working collaboratively, multidisciplinary experts embedded the CQI program into everyday practices in clinics across Alberta. Currently, 83% of surgeons participate in the CQI program, representing 95% of the total volume of hip and knee surgeries. Biannual reports provide feedback to improve care processes, infrastructure planning, and patient outcomes. CQI programs evaluating health care services inform choices to optimize care and improve efficiencies through continuous knowledge translation. © The Author(s) 2014.

  7. Educational program emergency planning.

    Science.gov (United States)

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  8. Student Feedback of Career Development Workshops for Program Improvement

    Science.gov (United States)

    LeBeau, J. E.; Pressley, S. N.

    2016-12-01

    A number of techniques are employed each year to evaluate the effectiveness of and to identify opportunities for improvement in the Laboratory for Atmospheric Research (LAR) REU program at Washington State University. For example, information gathered from pre-/post-surveys and pre-/post-interviews provides information regarding students' perceptions and levels of experience with the scientific process, career and academic goals, and motivation for joining the REU program. Poster session rubrics assess students' abilities to summarize their experiences in a professional setting. Alumni surveys gauge former participants' perceptions of the REU experience. One seemingly simple and highly useful, but often less documented, component of the evaluation process for program improvement is the use of workshop feedback forms. Weekly workshops are designed to provide students with enhanced knowledge and skills in the area of atmospheric chemistry as well as research design skills, academic and career guidance, and presentation skills. According to previous years' evaluation reports, workshops are largely beneficial to students for learning new skills. Yet, students suggest a number of recommendations that may benefit any REU program, such as: providing slides beforehand to provide a framework for the upcoming workshop, having instructors speak in more student-friendly language, covering higher-level topics, and including more hands-on, instructor-guided practice during the workshops. Thus, workshop feedback forms provide meaningful feedback to increase learning outcomes and enhance the REU student experience. This presentation will offer ideas gathered from over five years of workshop feedback forms that, while somewhat specific to workshops offered for the LAR REU, can offer faculty and PIs insight into the student experience, enhancing their ability to improve programming and achieve greater learning outcomes.

  9. [The family planning program in Rwanda: assessment of ten years (1981-1991) and prospects].

    Science.gov (United States)

    Munyakazi, A

    1990-12-01

    Rwanda's official family planning policy dates back to 1981 and creation of the National Office of Population (ONAPO). Among its other function, ONAPO monitors proper use of family planning methods and studies the integration of family planning services into public health. Pilot family planning programs began in the prefectures of Butare, Kigali, and Ruhengeri and were extended to the other 7 around 1985. The development of family planning services in Rwanda is based on their integration into existing services, especially those devoted to maternal-child health. In 1989, 277 of the 350 health centers of all kinds in Rwanda and 12 secondary posts offered family planning services. The rate of integration was 79.4%. 185 of the 277 health services with family planning services were in the public sector. As of December 1989, the rate of integration in different prefectures varied from a high of 95.5% in Kibungo to a low of 64.9% in Gisenyi. Integration is particularly weak in health facilities administered by the Catholic Church. The 2 strategies to confront this situation are continuing dialogue with Catholic Church officials and creation of secondary family planning posts to improve accessibility to family planning for populations served by Church health services. The number of new and continuing family planning users increased from 1178 and 1368 respectively in 1982 to 66,950 and 104,604 through September 1990. There is wide variation from 1 prefecture to another in recruitment of new acceptors and in the number of acceptors per health facility. Recruitment of new acceptors is greatest in Ruhengeri, followed by Kigali and Byumba. As of September 1990, 28,943 women used pills, 2037 used IUDs, 66,515 used injectables, 3051 used barrier methods, 2888 used auto-observation methods, 343 used implants, and 588 were sterilized. The overall rate of contraceptive prevalence increased from .9% in 1983 to 6.2% in 1989 and 10% in 1990. The strategy for promoting family planning

  10. Integrative improvement method and mixed-integer programming in system planning

    International Nuclear Information System (INIS)

    Sadegheih, A.

    2002-01-01

    In this paper, system planning network is formulated for mixed-integer programming and a Ga. The cost function of this problem consists of the capital investment cost in discrete form, the cost of transmission losses and the power generation costs. The Dc load flow equations for the network are embedded in the constraints of the mathematical model to avoid sub-optimal solutions that can arise if the enforcement of such constraints is done in an indirect way. The solution of the model gives the best line additions. and also provides information regarding the optimal generation at each generation point. This method of solutions is demonstrated on the expansion of a 5 bus -bar system to 6 bus-bars

  11. Patient-specific surgical simulator for the pre-operative planning of single-incision laparoscopic surgery with bimanual robots.

    Science.gov (United States)

    Turini, Giuseppe; Moglia, Andrea; Ferrari, Vincenzo; Ferrari, Mauro; Mosca, Franco

    2012-01-01

    The trend of surgical robotics is to follow the evolution of laparoscopy, which is now moving towards single-incision laparoscopic surgery. The main drawback of this approach is the limited maneuverability of the surgical tools. Promising solutions to improve the surgeon's dexterity are based on bimanual robots. However, since both robot arms are completely inserted into the patient's body, issues related to possible unwanted collisions with structures adjacent to the target organ may arise. This paper presents a simulator based on patient-specific data for the positioning and workspace evaluation of bimanual surgical robots in the pre-operative planning of single-incision laparoscopic surgery. The simulator, designed for the pre-operative planning of robotic laparoscopic interventions, was tested by five expert surgeons who evaluated its main functionalities and provided an overall rating for the system. The proposed system demonstrated good performance and usability, and was designed to integrate both present and future bimanual surgical robots.

  12. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  13. Need of patient-specific quality assurance and pre-treatment verification program for special plans in radiotherapy

    International Nuclear Information System (INIS)

    Ravichandran, Ramamoorthy; Bhasi, Saju; Binukumar, J.P.; Davis, C.A.

    2011-01-01

    Accuracy in planned radiation dose delivery in cancer treatments becomes necessary in the advent of complex treatment delivery options with newer technology using medical linear accelerators, which makes patient management very crucial. Treatment outcome in an individual patient therefore depends on the professional involvement of staff and execution accuracy of planned procedure. Therefore, this article has addressed an important problem. International Atomic Energy Agency (IAEA) and International Commission on Radiological Protection (ICRP) reported mis-administrations of radiation dose, the nature of their occurrence and complexity of situations. Lack of adequate quality assurance (QA) program or failure in their routine applications, complacency in attention, lack of knowledge, overconfidence, pressures of time, lack of resources and failures in communication are some of the general human causes of errors. A recent report enumerated misadministration of radiation doses under the heading 'harming instead of healing' delivery of wrong doses in small field treatment plans with stereotactic equipment' was mostly highlighted

  14. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    Energy Technology Data Exchange (ETDEWEB)

    Chapas, Richard B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colwell, Jeffery A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  15. Microcredit, family planning programs, and contraceptive behavior: evidence from a field experiment in Ethiopia.

    Science.gov (United States)

    Desai, Jaikishan; Tarozzi, Alessandro

    2011-05-01

    The impact of community-based family planning programs and access to credit on contraceptive use, fertility, and family size preferences has not been established conclusively in the literature. We provide additional evidence on the possible effect of such programs by describing the results of a randomized field experiment whose main purpose was to increase the use of contraceptive methods in rural areas of Ethiopia. In the experiment, administrative areas were randomly allocated to one of three intervention groups or to a fourth control group. In the first intervention group, both credit and family planning services were provided and the credit officers also provided information on family planning. Only credit or family planning services, but not both, were provided in the other two intervention groups, while areas in the control group received neither type of service. Using pre- and post-intervention surveys, we find that neither type of program, combined or in isolation, led to an increase in contraceptive use that is significantly greater than that observed in the control group. We conjecture that the lack of impact has much to do with the mismatch between women's preferred contraceptive method (injectibles) and the contraceptives provided by community-based agents (pills and condoms).

  16. Exercise program improved subjective dry eye symptoms for office workers.

    Science.gov (United States)

    Sano, Kokoro; Kawashima, Motoko; Takechi, Sayuri; Mimura, Masaru; Tsubota, Kazuo

    2018-01-01

    We investigated the benefits of a cognitive behavior therapy-based exercise program to reduce the dry eye symptoms of office workers. We recruited 11 office workers with dry eye symptoms, aged 31-64 years, who voluntarily participated in group health guidance at a manufacturing company. Participants learned about the role of physical activity and exercise in enhancing wellness and performed an exercise program at home 3 days per week for 10 weeks. We estimated the indexes of body composition, dry eye symptoms, and psychological distress using the Dry Eye-Related Quality of Life Score and the World Health Organization's Subjective Well-Being Inventory questionnaires pre- and postintervention. The 10-week exercise program and the questionnaires were completed by 48.1% (39 of 81) of the participants. Body composition did not change pre- and postintervention. However, the average of the Dry Eye-Related Quality of Life Score scores in participants with subjective dry eye significantly improved after the intervention. Moreover, the World Health Organization's Subjective Well-Being Inventory positive well-being score tended to increase after the intervention. In this study, we showed that a 10-week exercise program improved subjective dry eye symptoms of healthy office workers. Our study suggests that a cognitive behavior therapy-based exercise program can play an important role in the treatment of patients with dry eye disease.

  17. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    Science.gov (United States)

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  18. Learning to improve path planning performance

    International Nuclear Information System (INIS)

    Chen, Pang C.

    1995-04-01

    In robotics, path planning refers to finding a short. collision-free path from an initial robot configuration to a desired configuratioin. It has to be fast to support real-time task-level robot programming. Unfortunately, current planning techniques are still too slow to be effective, as they often require several minutes, if not hours of computation. To remedy this situation, we present and analyze a learning algorithm that uses past experience to increase future performance. The algorithm relies on an existing path planner to provide solutions to difficult tasks. From these solutions, an evolving sparse network of useful robot configurations is learned to support faster planning. More generally, the algorithm provides a speedup-learning framework in which a slow but capable planner may be improved both cost-wise and capability-wise by a faster but less capable planner coupled with experience. The basic algorithm is suitable for stationary environments, and can be extended to accommodate changing environments with on-demand experience repair and object-attached experience abstraction. To analyze the algorithm, we characterize the situations in which the adaptive planner is useful, provide quantitative bounds to predict its behavior, and confirm our theoretical results with experiments in path planning of manipulators. Our algorithm and analysis are sufficiently, general that they may also be applied to other planning domains in which experience is useful

  19. MULTIMODAL FEEDBACK PROVISION IN IMPROVING PRE-SERVICE TEACHERS’ COMPETENCE

    Directory of Open Access Journals (Sweden)

    Fazri Nur Yusuf

    2017-09-01

    Full Text Available Studies on potentials of feedback over English language teaching seem not to have not been well-revealed, including studies on the use of feedback to improve English pre-service teachers’ competence. The present study investigates to what extent a multimodal feedback can influence pre-service teachers’ teaching, and which teaching aspects are influenced. Twenty five pre-service teachers taking Microteaching Course served as respondents supervised by a course advisor. The data were collected by teacher observation in a rating-scale form, self-appraisal, and interviews. The data were analyzed by using correlated sample t-test and the eight teaching components proposed by Brown (2001. The results showed that after multimodal feedback provision, pre-service teachers indicated an improvement significantly in seven out of eight teaching aspects. The provision of multimodal feedback could improve their teaching competence on preparation, instructional objective elicitation, mastery of instructional materials, use of media, and classroom management, including classroom language. But, the results do not indicate that they perform well on reflection and follow-up due to some reasons. In addition, the results evince that multimodal feedback provision could improve pre-service teachers’ pedagogical competence when the multimodal feedback is integrated with content, interpersonal relationship, and management.

  20. Mixed-Methods Assessment of Trauma and Acute Care Surgical Quality Improvement Programs in Peru.

    Science.gov (United States)

    LaGrone, Lacey N; Fuhs, Amy K; Egoavil, Eduardo Huaman; Rodriguez Castro, Manuel J A; Valderrama, Roberto; Isquith-Dicker, Leah N; Herrera-Matta, Jaime; Mock, Charles N

    2017-04-01

    Evidence for the positive impact of quality improvement (QI) programs on morbidity, mortality, patient satisfaction, and cost is strong. Data regarding the status of QI programs in low- and middle-income countries, as well as in-depth examination of barriers and facilitators to their implementation, are limited. This cross-sectional, descriptive study employed a mixed-methods design, including distribution of an anonymous quantitative survey and individual interviews with healthcare providers who participate in the care of the injured at ten large hospitals in Lima, Peru. Key areas identified for improvement in morbidity and mortality (M&M) conferences were the standardization of case selection, incorporation of evidence from the medical literature into case presentation and discussion, case documentation, and the development of a clear plan for case follow-up. The key barriers to QI program implementation were a lack of prioritization of QI, lack of sufficient human and administrative resources, lack of political support, and lack of education on QI practices. A national program that makes QI a required part of all health providers' professional training and responsibilities would effectively address a majority of identified barriers to QI programs in Peru. Specifically, the presence of basic QI elements, such as M&M conferences, should be required at hospitals that train pre-graduate physicians. Alternatively, short of this national-level organization, efforts that capitalize on local examples through apprenticeships between institutions or integration of QI into continuing medical education would be expected to build on the facilitators for QI programs that exist in Peru.

  1. Combining administrative data feedback, reflection and action planning to engage primary care professionals in quality improvement: qualitative assessment of short term program outcomes.

    Science.gov (United States)

    Vachon, Brigitte; Désorcy, Bruno; Gaboury, Isabelle; Camirand, Michel; Rodrigue, Jean; Quesnel, Louise; Guimond, Claude; Labelle, Martin; Huynh, Ai-Thuy; Grimshaw, Jeremy

    2015-09-18

    Improving primary care for chronic disease management requires a coherent, integrated approach to quality improvement. Evidence in the continuing professional development (CPD) field suggests the importance of using strategies such as feedback delivery, reflective practice and action planning to facilitate recognition of gaps and service improvement needs. Our study explored the outcomes of a CPD intervention, named the COMPAS Project, which consists of a three-hour workshop composed of three main activities: feedback, critical reflection and action planning. The feedback intervention is delivered face-to-face and presents performance indicators extracted from clinical-administrative databases. This aim of this study was to assess the short term outcomes of this intervention to engage primary care professional in continuous quality improvement (QI). In order to develop an understanding of our intervention and of its short term outcomes, a program evaluation approach was used. Ten COMPAS workshops on diabetes management were directly observed and qualitative data was collected to assess the intervention short term outcomes. Data from both sources were combined to describe the characteristics of action plans developed by professionals. Two independent coders analysed the content of these plans to assess if they promoted engagement in QI and interprofessional collaboration. During the ten workshops held, 26 interprofessional work teams were formed. Twenty-two of them developed a QI project they could implement themselves and that targeted aspects of their own practice they perceived in need of change. Most frequently prioritized strategies for change were improvement of systematic clientele follow-up, medication compliance, care pathway and support to improve adoption of healthier life habits. Twenty-one out of 22 action plans were found to target some level of improvement of interprofessional collaboration in primary care. Our study results demonstrate that the

  2. Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program

    International Nuclear Information System (INIS)

    None

    2000-01-01

    This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects

  3. 谈项目施工的前期策划%Discussion on pre planning of project construction

    Institute of Scientific and Technical Information of China (English)

    谷来喜

    2014-01-01

    论述了项目前期策划的重要性,依据项目前期策划的基本原则,对项目策划的组织机构、施工部署、技术、质量、安全管理策划等项目施工前期策划编制的主要内容作了阐述,为项目管理提供参考依据。%This paper discussed the importance of project pre planning, based on the basic principles of project pre planning, elaborated the main contents of project planning organization, construction planning, technology, quality, safety management preparation and project construc-tion pre planning, provide reference basis for project management.

  4. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  5. Pre-Assessment: Promises and Cautions

    Science.gov (United States)

    Guskey, Thomas R.; McTighe, Jay

    2016-01-01

    Nearly every modern instructional planning model, differentiation approach, and personalized learning system incorporates some form of re-assessment. Yet there's scant research evidence that teachers use pre-assessment in ways that improve learning, according to Guskey and McTighe. To increase the likelihood that pre-assessment will be worth the…

  6. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  7. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  8. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  9. First regional CSM program planned.

    Science.gov (United States)

    1982-09-01

    6 countries in the English-speaking Caribbean (Antigua, Barbados, Dominica, St. Kitts/Nevis, St. Lucia, and St. Vincent) are scheduled to form the 1st regional contraceptive social marketing program. The program will be under the auspices of the Barbados Family Planning Association. By combining resources, contraceptive social marketing should be able to effectively augment family planning activities in smaller countries where individual programs wuld be too costly. The regional program will also determine whether program elements from 1 country in a region are relevant in other countries. The Caribbean region as a whole has experienced a general decline in both crude birth rates and fertility rates during the past 15 years; however, adolescent fertility rates remain high and an average of 46% of the populations of Caribbean countries are under 15 years of age. Although heavy emigration has traditionally curbed population increases, new restrictive immigration laws are expected. Further increases in the working age population will contribute to already high unemployment rates and hinder economic development. The 6 countries selected for the social marketing program are receptive to innovative family planning approaches and have the basic marketing infrastructure required. Community-based distribution programs already in operation in these countries distribute condoms, oral contraceptives, and barrier methods. The success of these programs has plateaued, and there is a need for delivery systems capable of reaching broader segments of the population. The social marketing program will be phased in to ensure local acceptance among national leaders and consumers. The regional program hopes to borrow elements from Jamaica's contraceptive social marketing program to avoid the costs involved in starting a program from scratch. A major innovation will be the use of mass media advertising for contraceptives.

  10. An analysis of pre-service family planning teaching in clinical and nursing education in Tanzania.

    Science.gov (United States)

    Muganyizi, Projestine S; Ishengoma, Joyce; Kanama, Joseph; Kikumbih, Nassoro; Mwanga, Feddy; Killian, Richard; McGinn, Erin

    2014-07-12

    Promoting family planning (FP) is a key strategy for health, economic and population growth. Sub-Saharan Africa, with one of the lowest contraceptive prevalence and highest fertility rates globally, contributes half of the global maternal deaths. Improving the quality of FP services, including enhancing pre-service FP teaching, has the potential to improve contraceptive prevalence. In efforts to improve the quality of FP services in Tanzania, including provider skills, this study sought to identify gaps in pre-service FP teaching and suggest opportunities for strengthening the training. Data were collected from all medical schools and a representative sample of pre-service nursing, Assistant Medical Officer (AMO), Clinical Officer (CO) and assistant CO schools in mainland Tanzania. Teachers responsible for FP teaching at the schools were interviewed using a semi-structured questionnaire. Observations on availability of teaching resources and other evidence of FP teaching and evaluation were documented. Relevant approved teaching documents were assessed for their suitability as competency-based FP teaching tools against predefined criteria. Quantitative data were analyzed using EPI Info 6 and qualitative data were manually analyzed using content analysis. A total of 35 pre-service schools were evaluated for FP teaching including 30 technical education and five degree offering schools. Of the assessed 11 pre-service curricula, only one met the criteria for suitability of FP teaching. FP teaching was typically theoretical with only 22.9% of all the schools having systems in place to produce graduates who could skillfully provide FP methods. Across schools, the target skills were the same level of competence and skewed toward short acting methods of contraception. Only 23.3% (n = 7) of schools had skills laboratories, 76% (n = 22) were either physically connected or linked to FP clinics. None of the degree providing schools practiced FP at its own teaching hospital

  11. The Effects of Pre-Task, On-Line, and Both Pre-Task and On-Line Planning on Fluency, Complexity, and Accuracy--The Case of Iranian EFL Learners' Written Production

    Science.gov (United States)

    Piri, Faramarz; Barati, Hossein; Ketabi, Saeed

    2012-01-01

    Previous studies on the effect of planning on language production have revealed that planning does have a positive effect on language performance in terms of fluency, complexity, and accuracy. The present study was an attempt to investigate the effects of pre-task, on-line, and both pre-task and on-line planning on fluency, accuracy, and…

  12. Bottom head failure program plan

    International Nuclear Information System (INIS)

    Meyer, R.O.

    1989-01-01

    Earlier this year the NRC staff presented a Revised Severe Accident Research Program Plan (SECY-89-123) to the Commission and initiated work on that plan. Two of the near-term issues in that plan involve failure of the bottom head of the reactor pressure vessel. These two issues are (1) depressurization and DCH and (2) BWR Mark I Containment Shell Meltthrough. ORNL has developed models for several competing failure mechanisms for BWRs. INEL has performed analytical and experimental work directly related to bottom head failure in connection with several programs. SNL has conducted a number of analyses and experimental activities to examine the failure of LWR vessels. In addition to the government-sponsored work mentioned above, EPRI and FAI performed studies on vessel failure for the Industry Degraded Core Rulemaking Program (IDCOR). EPRI examined the failure of a PWR vessel bottom head without penetrations, as found in some Combustion Engineering reactors. To give more attention to this subject as called for by the revised Severe Accident Research Plan, two things are being done. First, work previously done is being reviewed carefully to develop an overall picture and to determine the reliability of assumptions used in those studies. Second, new work is being planned for FY90 to try to complete a reasonable understanding of the failure process. The review and planning are being done in close cooperation with the ACRS. Results of this exercise will be presented in this paper

  13. CM Process Improvement and the International Space Station Program (ISSP)

    Science.gov (United States)

    Stephenson, Ginny

    2007-01-01

    This viewgraph presentation reviews the Configuration Management (CM) process improvements planned and undertaken for the International Space Station Program (ISSP). It reviews the 2004 findings and recommendations and the progress towards their implementation.

  14. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  15. ESnet Program Plan 1994

    Energy Technology Data Exchange (ETDEWEB)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  16. ESnet Program Plan 1994

    International Nuclear Information System (INIS)

    Merola, S.

    1994-01-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet's development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet's development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet's connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking

  17. Final report for the Pre-Freshman Enrichment Program (PREP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This project reflected cooperation across the disciplines in the physical sciences, engineering, mathematics and computer science. The University of the Pacific served as the center for this pre-college program. The idea was to use this link as a pilot program.

  18. 30 CFR 75.161 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...

  19. Umatilla River Subbasin Fish Habitat Improvement Program, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-05-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat conditions. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, through the restoration of stable channel function. This report provides a summary of Program activities for the 2005 calendar year (January 1 through December 31, 2005), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance (O&M), and (4) Monitoring and Evaluation (M&E). This report also summarizes activities associated with Program Administration, Interagency Coordination, and Public Education.

  20. Improving treatment plan evaluation with automation

    Science.gov (United States)

    Covington, Elizabeth L.; Chen, Xiaoping; Younge, Kelly C.; Lee, Choonik; Matuszak, Martha M.; Kessler, Marc L.; Keranen, Wayne; Acosta, Eduardo; Dougherty, Ashley M.; Filpansick, Stephanie E.

    2016-01-01

    The goal of this work is to evaluate the effectiveness of Plan‐Checker Tool (PCT) which was created to improve first‐time plan quality, reduce patient delays, increase the efficiency of our electronic workflow, and standardize and automate the physics plan review in the treatment planning system (TPS). PCT uses an application programming interface to check and compare data from the TPS and treatment management system (TMS). PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user as part of a plan readiness check for treatment. Prior to and during PCT development, errors identified during the physics review and causes of patient treatment start delays were tracked to prioritize which checks should be automated. Nineteen of 33 checklist items were automated, with data extracted with PCT. There was a 60% reduction in the number of patient delays in the six months after PCT release. PCT was successfully implemented for use on all external beam treatment plans in our clinic. While the number of errors found during the physics check did not decrease, automation of checks increased visibility of errors during the physics check, which led to decreased patient delays. The methods used here can be applied to any TMS and TPS that allows queries of the database. PACS number(s): 87.55.‐x, 87.55.N‐, 87.55.Qr, 87.55.tm, 89.20.Bb PMID:27929478

  1. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.

  2. Use of automated rendezvous trajectory planning to improve spacecraft operations efficiency

    Science.gov (United States)

    Mulder, Tom A.

    1991-01-01

    The current planning process for space shuttle rendezvous with a second Earth-orbiting vehicle is time consuming and costly. It is a labor-intensive, manual process performed pre-mission with the aid of specialized maneuver processing tools. Real-time execution of a rendezvous plan must closely follow a predicted trajectory, and targeted solutions leading up to the terminal phase are computed on the ground. Despite over 25 years of Gemini, Apollo, Skylab, and shuttle vehicle-to-vehicle rendezvous missions flown to date, rendezvous in Earth orbit still requires careful monitoring and cannot be taken for granted. For example, a significant trajectory offset was experienced during terminal phase rendezvous of the STS-32 Long Duration Exposure Facility retrieval mission. Several improvements can be introduced to the present rendezvous planning process to reduce costs, produce more fuel-efficient profiles, and increase the probability of mission success.

  3. Pre-movement planning processes in people with congenital mirror movements.

    Science.gov (United States)

    Franz, E A; Fu, Y

    2017-10-01

    Pre-movement processes were investigated in people with Congenital mirrormovement (CMM), a rare disorder in which bilateral movement (mirroring) occurs in the upper distal extremities (primarily the hands and fingers) during intended unilateral movements. Abnormal density of ipsilateral corticospinal projections is an established hallmark of CMM. This study tested whether the Lateralised Readiness Potential (LRP), which reflects movement planning and readiness, is also abnormal in people with CMM. Twenty-eight neurologically-normal controls and 8 people with CMM were tested on a unimanual Go/No-go task while electroencephalography (EEG) was recorded to assess the LRP. No significant group differences were found in reaction time (RT). However, significantly smaller LRP amplitudes were found, on average, in the CMM group compared to Controls at central-motor (C3,C4) sites in stimulus-locked and response-locked epochs; similar group differences were also found at further frontal sites (F3,F4) during response-locked epochs. Abnormal brain activity in pre-movement processes associated with response planning and preparation is present in people with CMM. Aberrant bilateral activity during pre-movement processes is clearly implicated; whether part of the etiology of CMM, or as a mechanism of neuro-compensation, is not yet known. Copyright © 2017 International Federation of Clinical Neurophysiology. Published by Elsevier B.V. All rights reserved.

  4. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  5. Preretirement Programs within Service Firms: Existing and Planned Programs.

    Science.gov (United States)

    Siegel, Sidney R.; Rives, Janet M.

    1980-01-01

    A study of 300 nonmanufacturing firms' current and projected preretirement programs indicated that (1) personnel departments have primary responsibility for existing programs, (2) focus is changing from financial planning to psychological counseling, and (3) such programs benefit the company as well as the employee. (SK)

  6. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  7. Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)

    International Nuclear Information System (INIS)

    Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

    1982-01-01

    The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public

  8. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  9. User Experience, Actual Use, and Effectiveness of an Information Communication Technology-Supported Home Exercise Program for Pre-Frail Older Adults

    NARCIS (Netherlands)

    Dekker-van Weering, Marit; Jansen-Kosterink, Stephanie; Frazer, Sanne; Vollenbroek-Hutten, Miriam

    2017-01-01

    Objective: The main objective of this study was to investigate the use and user experience of an Information Communication Technology-supported home exercise program when offered for independent use to pre-frail older adults. Our secondary aim was to explore whether the program improved quality of

  10. FY97 Geothermal R&D Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  11. Improvement Plans of Fermilab’s Proton Accelerator Complex

    Science.gov (United States)

    Shiltsev, Vladimir

    2017-09-01

    The flagship of Fermilab’s long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab’s Main Injector. The physics goals of the DUNE require a proton beam with a power of some 2.4 MW at 120 GeV, which is roughly four times the current maximum power. Here I discuss current performance of the Fermilab proton accelerator complex, our plans for construction of the SRF proton linac as key part of the Proton Improvement Plan-II (PIP-II), outline the main challenges toward multi-MW beam power operation of the Fermilab accelerator complex and the staged plan to achieve the required performance over the next 15 years.

  12. 49 CFR 613.200 - Statewide transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  13. Technical aspects of the integration of three-dimensional treatment planning dose parameters (GEC-ESTRO Working Group) into pre-implant planning for LDR gynecological interstitial brachytherapy.

    Science.gov (United States)

    Chi, A; Gao, M; Nguyen, N P; Albuquerque, K

    2009-06-01

    This study investigates the technical feasibility of pre-implant image-based treatment planning for LDR GYN interstitial brachytherapy(IB) based on the GEC-ESTRO guidelines. Initially, a virtual plan is generated based on the prescription dose and GEC-ESTRO defined OAR dose constraints with a pre-implant CT. After the actual implant, a regular diagnostic CT was obtained and fused with our pre-implant scan/initial treatment plan in our planning software. The Flexi-needle position changes, and treatment plan modifications were made if needed. Dose values were normalized to equivalent doses in 2 Gy fractions (LQED 2 Gy) derived from the linear-quadratic model with alpha/beta of 3 for late responding tissues and alpha/beta of 10 for early responding tissues. D(90) to the CTV, which was gross tumor (GTV) at the time of brachytherapy with a margin to count for microscopic disease, was 84.7 +/- 4.9% of the prescribed dose. The OAR doses were evaluated by D(2cc) (EBRT+IB). Mean D(2cc) values (LQED(2Gy)) for the rectum, bladder, sigmoid, and small bowel were the following: 63.7 +/- 8.4 Gy, 61.2 +/- 6.9 Gy, 48.0 +/- 3.5 Gy, and 49.9 +/- 4.2 Gy. This study confirms the feasibility of applying the GEC-ESTRO recommended dose parameters in pre-implant CT-based treatment planning in GYN IB. In the process, this pre-implant technique also demonstrates a good approximation of the target volume dose coverage, and doses to the OARs.

  14. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  15. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  16. 25 CFR 87.9 - Programming aspects of plans.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  17. Is Zero-Based Budgeting Different from Planning--Programming--Budgeting Systems?

    Science.gov (United States)

    Hentschke, Guilbert C.

    1977-01-01

    Successful adoption of zero-base budgeting (ZBB) will be greater than that of planning-programming-budgeting-systems (PPBS) because perceived problems inherent in PPBS are largely missing in ZBB; ZBB appears to fit current school district budgeting behavior; and ZBB seems to improve communication about the need for budget reform. (Author/IRT)

  18. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  19. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  20. Pre-Employment Laboratory Education. Child Care Guidebook.

    Science.gov (United States)

    Texas Tech Univ., Lubbock. Home Economics Instructional Materials Center.

    This guidebook is designed for use in teaching students enrolled in secondary pre-employment laboratory education (PELE) child care programs. The first of two major sections includes an overview for teachers in planning, conducting, and evaluating a child care program. Specific topics discussed in section 1 include (1) the school-operated center,…

  1. Application of finite element analysis in pre-operative planning for deformity correction of abnormal hip joints--a case series.

    Science.gov (United States)

    Rhyu, K H; Kim, Y H; Park, W M; Kim, K; Cho, T-J; Choi, I H

    2011-09-01

    In experimental and clinical research, it is difficult to directly measure responses in the human body, such as contact pressure and stress in a joint, but finite element analysis (FEA) enables the examination of in vivo responses by contact analysis. Hence, FEA is useful for pre-operative planning prior to orthopaedic surgeries, in order to gain insight into which surgical options will result in the best outcome. The present study develops a numerical simulation technique based on FEA to predict the surgical outcomes of osteotomy methods for the treatment of slipped capital femoral epiphyses. The correlation of biomechanical parameters including contact pressure and stress, for moderate and severe cases, is investigated. For severe slips, a base-of-neck osteotomy is thought to be the most reliable and effective surgical treatment, while any osteotomy may produce dramatic improvement for moderate slips. This technology of pre-operative planning using FEA can provide information regarding biomechanical parameters that might facilitate the selection of optimal osteotomy methods and corresponding surgical options.

  2. Program plan for research and development in support of LWR fuel recycle

    International Nuclear Information System (INIS)

    1975-01-01

    The ERDA program that is being planned to assist industry in the commercialization of the LWR fuel cycle will involve a range of activities, including joint programs with industry, R and D to provide technology, conceptual design of fuel recycle facilities, and environmental and economic assessments. A two-part program to begin in 1976 that is a portion of the overall ERDA plan is described. Responsibility for coordination and management of the tasks described in this document has been assigned to Du Pont as prime contractor to the ERDA Savannah River Operations Office. The first part of the program consists of the conceptual design of complete recycle facilities. The second part of the program, which will proceed concurrently, consists of supporting R and D activities, economic and environmental studies, and other studies to assist in the regulatory process. The R and D program will include both near-term activities in support of the conceptual design effort, and other activities aimed at general improvements in fuel cycle technology. The conceptual design will be used to develop current cost information for a complete reprocessing complex. The design will be based initially on current technology with provision for improvements as confirmatory information and advanced technology become available from the R and D program. The conceptual design and cost estimate will be developed by the Du Pont Atomic Energy Division. The R and D program and supporting studies will be directed at uncertainties in current technology as well as toward development of improved technology. It will include such R and D as might be appropriate for ERDA to undertake in support of joint programs with industry. The Savannah River Laboratory will have responsibility for coordinating the program

  3. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    Science.gov (United States)

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  4. Pre-K Physical Education: Universal Initiatives and Teacher Preparation Recommendations

    Science.gov (United States)

    Ross, Susan M.

    2013-01-01

    The "National Physical Activity Plan", as well as professional and government agencies (NASPE, 2008a; US Department of Health and Human Services, 2000) acknowledge pre-kindergarten (pre-K) children should be part of comprehensive school physical activity initiatives anchored in quality physical education programming. These…

  5. WIPP facility representative program plan

    International Nuclear Information System (INIS)

    1994-01-01

    This plan describes the Department of Energy (DOE), Carlsbad Area Office (CAO) facility representative (FR) program at the Waste Isolation Pilot Plant (WIPP). It provides the following information: (1) FR and support organization authorities and responsibilities; (2) FR program requirements; and (3) FR training and qualification requirements

  6. Improving Phonological Awareness in Parents of Children at Risk of Literacy Difficulties: A Preliminary Evaluation of the Boost Program

    Directory of Open Access Journals (Sweden)

    Mark E. Boyes

    2017-09-01

    Full Text Available BackgroundPhonological awareness is an important skill underpinning the development of early literacy. Given the central role of parents in supporting the development of children’s early literacy skills, and that poor parental phonological awareness is associated with poorer child literacy outcomes, it is possible that improving parent phonological awareness may aid literacy development for at-risk children. This study is a preliminary evaluation of a program aiming to improve phonological awareness skills of parents in low socioeconomic status communities, and also provide these parents with strategies to support their child’s literacy development.MethodsAfter completing the program, participants were asked if it had helped them learn about how to assist their child’s reading and spelling, whether they planned on using the resources provided, and if they would be likely to attend a future workshop building on the Boost program. Phonological awareness measures (rhyme, syllable, and phoneme level, and measures of overall confidence in performance on the phonological awareness tasks, were administered both before and after attending the program.ResultsAlmost all parents indicated that the program helped with learning how to assist their child’s reading and spelling, that they would use the resources provided, and would likely attend a future workshop. Significant increases in pre- to post-program phonological awareness scores were obtained at the rhyme and phoneme level.ConclusionThe program and associated resources appear acceptable to parents in communities with high rates of literacy problems and improved parents’ phonological awareness skills. However, findings are preliminary and further evaluation using more rigorous methodologies and testing whether improvements in parents’ phonological awareness translate into better literacy outcomes for children is needed.

  7. 30 CFR 77.107-1 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section... COAL MINES Qualified and Certified Persons § 77.107-1 Plans for training programs. Each operator must..., a program or plan setting forth what, when, how, and where the operator will train and retrain...

  8. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  9. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

    2007-02-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other

  10. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  11. Automation through the PIP [Program Implementation Plan] concurrence system improves information sharing among DOE [Dept. of Energy] managers

    International Nuclear Information System (INIS)

    Imholz, R.M.; Berube, D.S.; Peterson, J.L.

    1990-01-01

    The Program Implementation Plan (PIP) Concurrence System is designed to improve information sharing within the U.S. Department of Energy (DOE) and between DOE and the Field. Effectively sharing information enables DOE managers to make more informed, effective decisions. The PIP Concurrence System improved information sharing among DOE managers by defining the automated process for concurring on a DOE document, thus reducing the time required to concur on the document by 75%. The first step in defining an automated process is to structure the process for concurring on a document. Only those DOE managers with approved access could review certain parts of a document on a concurrence system. Remember that the concurrence process is a sign off procedure unlike a commentary process in which comments may not be restricted to certain people. The commentary process is the beginning of the concurrence process. The commentary process builds a document; the concurrence process approves it. 6 refs., 7 figs

  12. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  13. Convergence and accommodation development is pre-programmed in premature infants

    Science.gov (United States)

    Horwood, Anna M; Toor, Sonia S; Riddell, Patricia M

    2015-01-01

    Purpose This study investigated whether vergence and accommodation development in pre-term infants is pre-programmed or is driven by experience. Methods 32 healthy infants, born at mean 34 weeks gestation (range 31.2-36 weeks) were compared with 45 healthy full-term infants (mean 40.0 weeks) over a 6 month period, starting at 4-6 weeks post-natally. Simultaneous accommodation and convergence to a detailed target were measured using a Plusoptix PowerRefII infra-red photorefractor as a target moved between 0.33m and 2m. Stimulus/response gains and responses at 0.33m and 2m were compared by both corrected (gestational) age and chronological (post-natal) age. Results When compared by their corrected age, pre-term and full-term infants showed few significant differences in vergence and accommodation responses after 6-7 weeks of age. However, when compared by chronological age, pre-term infants’ responses were more variable, with significantly reduced vergence gains, reduced vergence response at 0.33m, reduced accommodation gain, and increased accommodation at 2m, compared to full-term infants between 8-13 weeks after birth. Conclusions When matched by corrected age, vergence and accommodation in pre-term infants show few differences from full-term infants’ responses. Maturation appears pre-programmed and is not advanced by visual experience. Longer periods of immature visual responses might leave pre-term infants more at risk of development of oculomotor deficits such as strabismus. PMID:26275135

  14. Improving Retention and Enrollment Forecasting in Part-Time Programs

    Science.gov (United States)

    Shapiro, Joel; Bray, Christopher

    2011-01-01

    This article describes a model that can be used to analyze student enrollment data and can give insights for improving retention of part-time students and refining institutional budgeting and planning efforts. Adult higher-education programs are often challenged in that part-time students take courses less reliably than full-time students. For…

  15. National program for family planning and primary health care Pakistan: a SWOT analysis.

    Science.gov (United States)

    Wazir, Mohammad Salim; Shaikh, Babar Tasneem; Ahmed, Ashfaq

    2013-11-22

    The National Program for Family Planning and Primary Healthcare was launched in 1994. It is one of the largest community based programs in the world, providing primary healthcare services to about 80 million people, most of which is rural poor. The program has been instrumental in improving health related indicators of maternal and child health in the last two decades. SWOT analysis was used by making recourse to the structure and dynamics of the program as well as searching the literature. Strengths of the program include: comprehensive design of planning, implementation and supervision mechanisms aided by an MIS, selection and recruitments processes and evidence created through improving health impact indicators. Weaknesses identified are slow progress, poor integration of the program with health services at local levels including MIS, and de-motivational factors such as job insecurity and non-payment of salaries in time. Opportunities include further widening the coverage of services, its potential contribution to health system research, and its use in areas other than health like women empowerment and poverty alleviation. Threats the program may face are: political interference, lack of funds, social threats and implications for professional malpractices. Strengthening of the program will necessitate a strong political commitment, sustained funding and a just remuneration to this bare foot doctor of Pakistan, the Lady Health Worker.

  16. Process Evaluation for Improving K12 Program Effectiveness: Case Study of a National Institutes of Health Building Interdisciplinary Research Careers in Women's Health Research Career Development Program.

    Science.gov (United States)

    Raymond, Nancy C; Wyman, Jean F; Dighe, Satlaj; Harwood, Eileen M; Hang, Mikow

    2018-06-01

    Process evaluation is an important tool in quality improvement efforts. This article illustrates how a systematic and continuous evaluation process can be used to improve the quality of faculty career development programs by using the University of Minnesota's Building Interdisciplinary Research Careers in Women's Health (BIRCWH) K12 program as an exemplar. Data from a rigorous process evaluation incorporating quantitative and qualitative measurements were analyzed and reviewed by the BIRCWH program leadership on a regular basis. Examples are provided of how this evaluation model and processes were used to improve many aspects of the program, thereby improving scholar, mentor, and advisory committee members' satisfaction and scholar outcomes. A rigorous evaluation plan can increase the effectiveness and impact of a research career development plan.

  17. Using program impact pathways to understand and improve program delivery, utilization, and potential for impact of Helen Keller International's homestead food production program in Cambodia.

    Science.gov (United States)

    Olney, Deanna K; Vicheka, Sao; Kro, Meng; Chakriya, Chhom; Kroeun, Hou; Hoing, Ly Sok; Talukder, Aminzzaman; Quinn, Victoria; Iannotti, Lora; Becker, Elisabeth; Roopnaraine, Terry

    2013-06-01

    Evidence of the impact of homestead food production programs on nutrition outcomes such as anemia and growth is scant. In the absence of information on program impact pathways, it is difficult to understand why these programs, which have been successful in increasing intake of micronutrient-rich foods, have had such limited documented impact on nutrition outcomes. To conduct a process evaluation of Helen Keller International's (HKI's) homestead food production program in Cambodia to assess whether the program was operating as planned (in terms of design, delivery, and utilization) and to identify ways in which the program might need to be strengthened in order to increase its potential for impact. A program theory framework, which laid out the primary components along the hypothesized program impact pathways, was developed in collaboration with HKI and used to design the research. Semistructured interviews and focus group discussions with program beneficiaries (n = 36 and 12, respectively), nonbeneficiaries (n = 12), and program implementers (n = 17 and 2, respectively) and observations of key program delivery points, including health and nutrition training sessions (n = 6), village model farms (n = 6), and household gardens of beneficiaries (n = 36) and nonbeneficiaries (n = 12), were conducted to assess the delivery and utilization of the primary program components along the impact pathways. The majority of program components were being delivered and utilized as planned. However, challenges with some of the key components posited to improve outcomes such as anemia and growth were noted. Among these were a gap in the expected pathway from poultry production to increased intake of eggs and poultry meat, and some weaknesses in the delivery of the health and nutrition training sessions and related improvements in knowledge among the village health volunteers and beneficiaries. Although the program has been successful in delivering the majority of the program

  18. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  19. 42 CFR 441.474 - Quality assurance and improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State... pursue opportunities for system improvement. (b) The quality assurance and improvement plan shall also...

  20. Promoting Diversity in STEM through Active Recruiting and Mentoring: The Pre-Major in Astronomy Program (Pre-MAP) at the University of Washington

    Science.gov (United States)

    Schwieterman, Edward; Binder, Breanna; Tremmel, Michael; Garofali, Kristen; Agol, Eric; Meadows, Victoria

    2015-11-01

    The Pre-Major in Astronomy Program (Pre-MAP) is a research and mentoring program for underclassmen and transfer students offered by the University of Washington Astronomy Department since 2005. The primary goal of Pre-MAP is to recruit and retain students from groups traditionally underrepresented in science, technology, engineering, and mathematics (STEM) through early exposure to research. The Pre-MAP seminar is the core component of the program and offers instruction in computing skills, data manipulation, science writing, statistical analysis, and scientific speaking and presentation skills. Students choose research projects proposed by faculty, post-docs and graduate students in areas related to astrophysics, planetary science, and astrobiology. Pre-MAP has been successful in retaining underrepresented students in STEM fields relative to the broader UW population, and we've found these students are more likely to graduate and excel academically than their peers. As of spring 2015, more than one hundred students have taken the Pre-MAP seminar, and both internal and external evaluations have shown that all groups of participating students report an increased interest in astronomy and science careers at the end of the seminar. Several former Pre-MAP students have obtained or are pursuing doctoral and master’s degrees in STEM fields; many more work at NASA centers, teaching colleges, or as engineers or data analysts. Pre- MAP student research has produced dozens of publications in peer-reviewed research journals. This talk will provide an overview of the program: the structure of the seminar, examples of projects completed by students, cohort-building activities outside the seminar, funding sources, recruitment strategies, and the aggregate demographic and achievement data of our students. It is our hope that similar programs may be adopted successfully at other institutions.

  1. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  2. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  3. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    International Nuclear Information System (INIS)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991

  4. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  5. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  6. 45 CFR 235.62 - State plan requirements for training programs.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false State plan requirements for training programs. 235... ADMINISTRATION OF FINANCIAL ASSISTANCE PROGRAMS § 235.62 State plan requirements for training programs. A State plan under title I, IV-A, X, XIV, or XVI (AABD) of the Act must provide for a training program for...

  7. Quality and Characteristics of the North Carolina Pre-Kindergarten Program: 2011-2012 Statewide Evaluation

    Science.gov (United States)

    Peisner-Feinberg, Ellen; Schaaf, Jennifer; Hildebrandt, Lisa; LaForett, Dore

    2013-01-01

    The North Carolina Pre-Kindergarten Program (NC Pre-K) is a state-funded initiative for at-risk 4-year-olds, designed to provide a high quality, classroom-based educational program during the year prior to kindergarten entry. Children are eligible for NC Pre-K based on age, family income (at or below 75% of state median income), and other risk…

  8. Improving an Integer Linear Programming Model of an Ecovat Buffer by Adding Long-Term Planning

    Directory of Open Access Journals (Sweden)

    Gijs J. H. de Goeijen

    2017-12-01

    Full Text Available The Ecovat is a seasonal thermal storage solution consisting of a large underground water tank divided into a number of virtual segments that can be individually charged and discharged. The goal of the Ecovat is to supply heat demand to a neighborhood throughout the entire year. In this work, we extend an integer linear programming model to describe the charging and discharging of such an Ecovat buffer by adding a long-term (yearly planning step to the model. We compare the results from the model using this extension to previously obtained results and show significant improvements when looking at the combination of costs and the energy content of the buffer at the end of the optimization. Furthermore, we show that the model is very robust against prediction errors. For this, we compare two different cases: one case in which we assume perfect predictions are available and one case in which we assume no predictions are available. The largest observed difference in costs between these two cases is less than 2%.

  9. Exercise program improved subjective dry eye symptoms for office workers

    Directory of Open Access Journals (Sweden)

    Sano K

    2018-02-01

    Full Text Available Kokoro Sano,1 Motoko Kawashima,1 Sayuri Takechi,2 Masaru Mimura,2 Kazuo Tsubota1 1Department of Ophthalmology, 2Department of Neuropsychiatry, Keio University School of Medicine, Tokyo, Japan Introduction: We investigated the benefits of a cognitive behavior therapy-based exercise program to reduce the dry eye symptoms of office workers. Materials and methods: We recruited 11 office workers with dry eye symptoms, aged 31–64 years, who voluntarily participated in group health guidance at a manufacturing company. Participants learned about the role of physical activity and exercise in enhancing wellness and performed an exercise program at home 3 days per week for 10 weeks. We estimated the indexes of body composition, dry eye symptoms, and psychological distress using the Dry Eye-Related Quality of Life Score and the World Health Organization’s Subjective Well-Being Inventory questionnaires pre- and postintervention. Results: The 10-week exercise program and the questionnaires were completed by 48.1% (39 of 81 of the participants. Body composition did not change pre- and postintervention. However, the average of the Dry Eye-Related Quality of Life Score scores in participants with subjective dry eye significantly improved after the intervention. Moreover, the World Health Organization’s Subjective Well-Being Inventory positive well-being score tended to increase after the intervention. Conclusion: In this study, we showed that a 10-week exercise program improved subjective dry eye symptoms of healthy office workers. Our study suggests that a cognitive behavior therapy-based exercise program can play an important role in the treatment of patients with dry eye disease. Keywords: dry eye, exercise, office workers, cognitive behavioral therapy

  10. Functional MRI in pre-surgical planning: Case study and cautionary notes

    Directory of Open Access Journals (Sweden)

    Bruce S Spottiswoode

    2012-09-01

    Full Text Available Background. Since its inception almost 20 years ago, functional magnetic resonance imaging (fMRI has greatly advanced our knowledge of human brain function. Although the clinical applications of fMRI are still limited, there have recently been encouraging advances for its use in pre-operative functional cortical mapping to identify potentially eloquent areas prior to neurosurgery. Objectives. We explore the potential use of this emerging technique by presenting a neurosurgical case study, as performed at the Cape Universities Brain Imaging Centre (CUBIC, Tygerberg, Cape Town. We conclude with a brief summary of the potential pitfalls of this technique, as well as cautionary guidelines based on our experience. Methods and results. A 22-year-old male patient from Tygerberg Hospital underwent the successful resection of an anaplastic astrocytoma after fMRI presurgical planning at our facility. The subject was able to leave the ward unassisted. Conclusion. If consideration is given to the many limitations of this emerging technique, fMRI can be useful in aiding the neurosurgeon in pre-operative planning of his surgical approach.

  11. Indonesia's family planning program works toward self-sufficiency.

    Science.gov (United States)

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  12. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  13. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  14. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  15. Severe Accident Research Program plan update

    International Nuclear Information System (INIS)

    1992-12-01

    In August 1989, the staff published NUREG-1365, ''Revised Severe Accident Research Program Plan.'' Since 1989, significant progress has been made in severe accident research to warrant an update to NUREG-1365. The staff has prepared this SARP Plan Update to: (1) Identify those issues that have been closed or are near completion, (2) Describe the progress in our understanding of important severe accident phenomena, (3) Define the long-term research that is directed at improving our understanding of severe accident phenomena and developing improved methods for assessing core melt progression, direct containment heating, and fuel-coolant interactions, and (4) Reflect the growing emphasis in two additional areas--advanced light water reactors, and support for the assessment of criteria for containment performance during severe accidents. The report describes recent major accomplishments in understanding the underlying phenomena that can occur during a severe accident. These include Mark I liner failure, severe accident scaling methodology, source term issues, core-concrete interactions, hydrogen transport and combustion, TMI-2 Vessel Investigation Project, and direct containment heating. The report also describes the major planned activities under the SARP over the next several years. These activities will focus on two phenomenological issues (core melt progression, and fuel-coolant interactions and debris coolability) that have significant uncertainties that impact our understanding and ability to predict severe accident phenomena and their effect on containment performance SARP will also focus on severe accident code development, assessment and validation. As the staff completes the research on severe accident issues that relate to current generation reactors, continued research will focus on efforts to independently evaluate the capability of new advanced light water reactor designs to withstand severe accidents

  16. Improving medication titration in heart failure by embedding a structured medication titration plan.

    Science.gov (United States)

    Hickey, Annabel; Suna, Jessica; Marquart, Louise; Denaro, Charles; Javorsky, George; Munns, Andrew; Mudge, Alison; Atherton, John J

    2016-12-01

    To improve up-titration of medications to target dose in heart failure patients by improving communication from hospital to primary care. This quality improvement project was undertaken within three heart failure disease management (HFDM) services in Queensland, Australia. A structured medication plan was collaboratively designed and implemented in an iterative manner, using methods including awareness raising and education, audit and feedback, integration into existing work practice, and incentive payments. Evaluation was undertaken using sequential audits, and included process measures (use of the titration plan, assignment of responsibility) and outcome measures (proportion of patients achieving target dose) in HFDM service patients with reduced left ventricular ejection fraction. Comparison of the three patient cohorts (pre-intervention cohort A n=96, intervention cohort B n=95, intervention cohort C n=89) showed increase use of the titration plan, a shift to greater primary care responsibility for titration, and an increase in the proportion of patients achieving target doses of angiotensin converting enzyme inhibitors/angiotensin receptor blockers (ACEI/ARB) (A 37% vs B 48% vs C 55%, p=0.051) and beta-blockers (A 38% vs B 33% vs C 51%, p=0.045). Combining all three cohorts, patients not on target doses when discharged from hospital were more likely to achieve target doses of ACEI/ARB (pplan. A medication titration plan was successfully implemented in three HFDM services and improved transitional communication and achievement of target doses of evidence-based therapies within six months of hospital discharge. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  17. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  18. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... must correct the deficiency either immediately or pursuant to a Quality Improvement Plan. (c) An Early... Improvement Plan must submit to the responsible HHS official a Quality Improvement Plan specifying, for each...

  19. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  20. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  1. Strategic planning in an academic radiation medicine program.

    Science.gov (United States)

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  2. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  3. A decision support system for pre-earthquake planning of lifeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Liang, J.W. [Tianjin Univ. (China). Dept. of Civil Engineering

    1996-12-01

    This paper describes the frame of a decision support system for pre-earthquake planning of gas and water networks. The system is mainly based on the earthquake experiences and lessons from the 1976 Tangshan earthquake. The objective of the system is to offer countermeasures and help make decisions for seismic strengthening, remaking, and upgrading of gas and water networks.

  4. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    Science.gov (United States)

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  5. 7 CFR 22.304 - Multiyear planning and programming.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  6. Women's experiences after Planned Parenthood's exclusion from a family planning program in Texas.

    Science.gov (United States)

    Woo, C Junda; Alamgir, Hasanat; Potter, Joseph E

    2016-04-01

    We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006-2010 (NSFG). (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Requiring low-income family planning patients to switch healthcare providers has adverse consequences. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  8. Open pre-schools at integrated health services - A program theory

    Directory of Open Access Journals (Sweden)

    Agneta Abrahamsson

    2013-04-01

    Full Text Available Introduction: Family centres in Sweden are integrated services that reach all prospective parents and parents with children up to their sixth year, because of the co-location of the health service with the social service and the open pre-school. The personnel on the multi-professional site work together to meet the needs of the target group. The article explores a program theory focused on the open pre-schools at family centres.Method: A multi-case design is used and the sample consists of open pre-schools at six family centres. The hypothesis is based on previous research and evaluation data. It guides the data collection which is collected and analysed stepwise. Both parents and personnel are interviewed individually and in groups at each centre.Findings: The hypothesis was expanded to a program theory. The compliance of the professionals was the most significant element that explained why the open access service facilitated positive parenting. The professionals act in a compliant manner to meet the needs of the children and parents as well as in creating good conditions for social networking and learning amongst the parents. Conclusion: The compliance of the professionals in this program theory of open pre-schools at family centres can be a standard in integrated and open access services, whereas the organisation form can vary. The best way of increasing the number of integrative services is to support and encourage professionals that prefer to work in a compliant manner.

  9. Open pre-schools at integrated health services - A program theory

    Directory of Open Access Journals (Sweden)

    Agneta Abrahamsson

    2013-04-01

    Full Text Available Introduction: Family centres in Sweden are integrated services that reach all prospective parents and parents with children up to their sixth year, because of the co-location of the health service with the social service and the open pre-school. The personnel on the multi-professional site work together to meet the needs of the target group. The article explores a program theory focused on the open pre-schools at family centres. Method: A multi-case design is used and the sample consists of open pre-schools at six family centres. The hypothesis is based on previous research and evaluation data. It guides the data collection which is collected and analysed stepwise. Both parents and personnel are interviewed individually and in groups at each centre. Findings: The hypothesis was expanded to a program theory. The compliance of the professionals was the most significant element that explained why the open access service facilitated positive parenting. The professionals act in a compliant manner to meet the needs of the children and parents as well as in creating good conditions for social networking and learning amongst the parents. Conclusion: The compliance of the professionals in this program theory of open pre-schools at family centres can be a standard in integrated and open access services, whereas the organisation form can vary. The best way of increasing the number of integrative services is to support and encourage professionals that prefer to work in a compliant manner.

  10. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  11. Quality improvement initiatives: the missed opportunity for health plans.

    Science.gov (United States)

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  12. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    Science.gov (United States)

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  13. Long Island Transportation Plan to Manage Congestion: Framework for Developing and Evaluating Improvement Strategies

    Science.gov (United States)

    2002-04-20

    The Long Island Transportation Plan to Manage Congestion (LITP 2000) will establish an integrated, multi-modal transportation program of cost-effective strategies to manage congestion and improve the movement of people and goods in Nassau and Suffolk...

  14. Improved physical fitness among older female participants in a nationally disseminated, community-based exercise program.

    Science.gov (United States)

    Seguin, Rebecca A; Heidkamp-Young, Eleanor; Kuder, Julia; Nelson, Miriam E

    2012-04-01

    Strength training (ST) is an important health behavior for aging women; it helps maintain strength and function and reduces risk for chronic diseases. This study assessed change in physical fitness following participation in a ST program implemented and evaluated by community leaders. The StrongWomen Program is a nationally disseminated, research-based, community ST program active in 40 states. The Senior Fitness Test is used to assess upper and lower body strength, upper and lower body flexibility, aerobic fitness, and agility; data are collected prior to and following program participation. For these analyses, five states provided deidentified data for 367 female participants, mean age 63 (±11) years. Attendance in approximately 10 weeks of twice-weekly classes was 69.4%. Paired t tests were used to analyze pre-post change. Significant improvements were observed (p age-group and compared with published, age-based norms. This study demonstrates that it is feasible for community leaders to conduct pre-post physical fitness evaluations with participants and that participants experienced improvements across several important domains of physical fitness.

  15. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  16. The GPM Ground Validation Program: Pre to Post-Launch

    Science.gov (United States)

    Petersen, W. A.

    2014-12-01

    NASA GPM Ground Validation (GV) activities have transitioned from the pre to post-launch era. Prior to launch direct validation networks and associated partner institutions were identified world-wide, covering a plethora of precipitation regimes. In the U.S. direct GV efforts focused on use of new operational products such as the NOAA Multi-Radar Multi-Sensor suite (MRMS) for TRMM validation and GPM radiometer algorithm database development. In the post-launch, MRMS products including precipitation rate, types and data quality are being routinely generated to facilitate statistical GV of instantaneous and merged GPM products. To assess precipitation column impacts on product uncertainties, range-gate to pixel-level validation of both Dual-Frequency Precipitation Radar (DPR) and GPM microwave imager data are performed using GPM Validation Network (VN) ground radar and satellite data processing software. VN software ingests quality-controlled volumetric radar datasets and geo-matches those data to coincident DPR and radiometer level-II data. When combined MRMS and VN datasets enable more comprehensive interpretation of ground-satellite estimation uncertainties. To support physical validation efforts eight (one) field campaigns have been conducted in the pre (post) launch era. The campaigns span regimes from northern latitude cold-season snow to warm tropical rain. Most recently the Integrated Precipitation and Hydrology Experiment (IPHEx) took place in the mountains of North Carolina and involved combined airborne and ground-based measurements of orographic precipitation and hydrologic processes underneath the GPM Core satellite. One more U.S. GV field campaign (OLYMPEX) is planned for late 2015 and will address cold-season precipitation estimation, process and hydrology in the orographic and oceanic domains of western Washington State. Finally, continuous direct and physical validation measurements are also being conducted at the NASA Wallops Flight Facility multi

  17. Measuring Pre-Kindergarten Teachers' Perceptions: Compliance with the High/Scope Program

    Science.gov (United States)

    Palenzuela, Silvia M.

    2004-01-01

    The research study examined the relationship between pre-kindergarten teachers' age and years of experience with their perceptions and their actual compliance with the norms of the High/Scope Pre-kindergarten Program. Teachers' perceptions of satisfaction with the supervisory relationship were measured by the Early Childhood Job Satisfaction…

  18. The Effect of TMPT Program on Pre-School Children's Social Problem Solving Skills

    Science.gov (United States)

    Gur, Cagla; Kocak, Nurcan

    2018-01-01

    Purpose: Starting Thinking Training at an early age is important. However, few studies were found regarding Thinking Training programs for pre-school children and the contributions of these programs to children's social problem-solving. In this context, the TMPT Program was developed for pre-school children and the effect of the program on 5-6…

  19. Pre-Employment Laboratory Education. Home Furnishings/Interior Design Guidebook.

    Science.gov (United States)

    Texas Tech Univ., Lubbock. Home Economics Instructional Materials Center.

    This guidebook is designed for use in teaching students enrolled in pre-employment laboratory education (PELE) home furnishing/interior design programs. The first of two major sections includes an overview for teachers on planning, conducting, and evaluating a home furnishings/interior design program. Specific topics discussed in section 1 include…

  20. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  1. SRS ES and H Standards Compliance Program Implementation Plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs

  2. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  3. Strategic planning in an academic radiation medicine program

    Science.gov (United States)

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  4. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  5. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  6. The effects of musical training on movement pre-programming and re-programming abilities: an event-related potential investigation.

    Science.gov (United States)

    Anatürk, Melis; Jentzsch, Ines

    2015-03-01

    Two response precuing experiments were conducted to investigate effects of musical skill level on the ability to pre- and re-programme simple movements. Participants successfully used advance information to prepare forthcoming responses and showed response slowing when precue information was invalid rather than valid. This slowing was, however, only observed for partially invalid but not fully invalid precues. Musicians were generally faster than non-musicians, but no group differences in the efficiency of movement pre-programming or re-programming were observed. Interestingly, only musicians exhibited a significant foreperiod lateralized readiness potential (LRP) when response hand was pre-specified or full advance information was provided. These LRP findings suggest increased effector-specific motor preparation in musicians than non-musicians. However, here the levels of effector-specific preparation did not predict preparatory advantages observed in behaviour. In sum, combining the response precuing and ERP paradigms serves a valuable tool to examine influences of musical training on movement pre- or re-programming processes. Copyright © 2015 Elsevier B.V. All rights reserved.

  7. Effect of supervised structured aerobic exercise training program of interleukin-6, nitric oxide synthase-1, and cyclooxygenase-2 in type 2 diabetes mellitus

    International Nuclear Information System (INIS)

    Karimi, H.; Gillani, S.A.; Rehman, S.S.U.

    2017-01-01

    To determine the effects of supervised structured aerobic exercise training (SSAET) program on interleukin-6 (IL-6), nitric oxide synthase 1 (NOS-1), and cyclooxygenase-2 (COX-2) in type 2 diabetes mellitus (T2DM). Study Design: Randomized controlled trial. Place and Duration of Study: Riphah Rehabilitation and Research Centre, Railways General Hospital, Rawalpindi, from January 2015 to June 2016. Methodology: Patients of either gender of minimum one year history of T2DM ranging from 40-70 years of age were included. Those with chronic systemic diseases, history of regular exercise, smoking, and those on dietary plan were excluded. A total of 195 patients were screened; 120 were selected and 102 agreed to participate in the study. They were randomly placed into experimental and control groups. SSAET program, routine medication, and dietary plan were applied in experimental group; whereas, control group was managed with routine medication and dietary plan for 25 weeks. IL-6, NOS-1, and COX-2 were assessed at baseline and 25 weeks. Results: SSAET program, routine medication and dietary plan showed significantly improved IL-6 (pre-mean=0.25 +-0.11ng/ml, post-mean=0.19 +-0.04 ng/ml), NOS-1 (pre-median=4.65 ng/ml, IQ range=1.04 ng/ml), (post-median=2.72 ng/ml, IQ range=1.60 ng/ml), and COX-2 (pre-mean=18.72 +-4.42 ng/ml, post-mean=15.18 +-2.63 ng/ml) in experimental group, as compared with control group managed by routine medication and dietary plan, where deterioration was noted in IL-6 (pre-mean=0.23 +-0.08 ng/ml, post-mean=0.27 +-0.08 ng/ml) and COX-2 (pre-mean=18.49 +-4.56 ng/ml, post-mean=19.10 +-4.76 ng/ml), while NOS-1 slight improvement (pre-mean=4.99 ng/ml, IQ range=2.67 ng/ml), (post-mean=4.56 ng/ml, IQ range=3.85 ng/ml). Statistically at the baseline the p-values were not significant (p>0.05) in both experimental and control groups for IL-6, COX-2 and NOS-1; while after 25 weeks of intervention, the experimental group showed significant improvement (p<0

  8. Promoting Inclusivity in STEM through Active Recruiting and Mentoring: The Pre-Major in Astronomy Program (Pre-MAP) at the University of Washington

    Science.gov (United States)

    Schwieterman, Edward; Binder, Breanna A.; Pre-Major in Astronomy Program

    2016-01-01

    The Pre-Major in Astronomy Program (Pre-MAP) is a research and mentoring program for entering undergraduate students offered by the University of Washington Astronomy Department since 2005. The primary goal of Pre-MAP is to recruit and retain students from groups traditionally underrepresented in science, technology, engineering, and mathematics (STEM) through early exposure to guided research projects. The Pre-MAP seminar is the core component of the program and offers instruction in computing skills, data manipulation, science writing, statistical analysis, and scientific speaking and presentation skills. Students choose research projects proposed by faculty, post-docs and graduate students in areas related to astrophysics, planetary science, and astrobiology. Pre-MAP has been successful in retaining underrepresented students in STEM fields relative to the broader UW population, and we've found these students are more likely to graduate and excel academically than their peers. As of fall 2015, more than one hundred students have taken the Pre-MAP seminar, and both internal and external evaluations have shown that all groups of participating students report an increased interest in astronomy and science careers at the end of the seminar. This talk will provide an overview of the program and the structure of the core seminar. In particular, the talk will focus on additions and revisions to the seminar course over the last few years, such as the introduction of a public speaking coach, career and internship modules, and the formalization of external lab tours.

  9. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  10. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  11. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  12. 40 CFR 303.32 - Pre-payment offers.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Pre-payment offers. 303.32 Section 303.32 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS CITIZEN AWARDS FOR INFORMATION ON CRIMINAL VIOLATIONS UNDER...

  13. Organisational travel plans for improving health.

    Science.gov (United States)

    Hosking, Jamie; Macmillan, Alexandra; Connor, Jennie; Bullen, Chris; Ameratunga, Shanthi

    2010-03-17

    quality and extracted data. Seventeen studies were included. Ten were conducted in a school setting, two in universities, and five in workplaces. One study directly measured health outcomes, and all included studies measured travel outcomes. Two cluster randomised controlled trials in the school setting showed either no change in travel mode or mixed results. A randomised controlled trial in the workplace setting, conducted in a pre-selected group who were already contemplating or preparing for active travel, found improved health-related quality of life on some sub scales, and increased walking. Two controlled before-after studies found that school travel interventions increased walking. Other studies were judged to be at high risk of bias. No included studies were conducted in low- or middle-income countries, and no studies measured the social distribution of effects or adverse effects, such as injury. There is insufficient evidence to determine whether organisational travel plans are effective for improving health or changing travel mode. Organisational travel plans should be considered as complex health promotion interventions, with considerable potential to influence community health outcomes depending on the environmental context in which they are introduced. Given the current lack of evidence, organisational travel plans should be implemented in the context of robustly-designed research studies, such as well-designed cluster randomised trials.

  14. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  15. The Denver region traffic signal system improvement program : planning for management and operations

    Science.gov (United States)

    2009-04-01

    The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...

  16. Techniques for overcoming community resistance to family planning programs.

    Science.gov (United States)

    Palley, H A

    1968-01-01

    Methods of overcoming resistance to publicly subsidized family planning programs are discussed. The main sources of opposition include groups that oppose family planning for moral reasons, and those who object to the spending of government funds to provide services and information. Such opposition can be weakened by indicating that family planning clinics fulf: 11 important medical needs. Presenting social justification for family planning can help to lower oppostion. In order to secure participation in the programs by low income groups it is essential to have community leaders involved in policy decisions and to use indigenous community paraprofessionals in the clinics. A coalition of representatives of the poor community and the health and welfare system, aided by the community organization, can lead to an effective family planning program.

  17. Planning-Programming-Budgeting Systems.

    Science.gov (United States)

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  18. Operations research to add postpartum family planning to maternal and neonatal health to improve birth spacing in Sylhet District, Bangladesh.

    Science.gov (United States)

    Ahmed, Salahuddin; Norton, Maureen; Williams, Emma; Ahmed, Saifuddin; Shah, Rasheduzzaman; Begum, Nazma; Mungia, Jaime; Lefevre, Amnesty; Al-Kabir, Ahmed; Winch, Peter J; McKaig, Catharine; Baqui, Abdullah H

    2013-08-01

    Short birth intervals are associated with increased risk of adverse maternal and neonatal health (MNH) outcomes. Improving postpartum contraceptive use is an important programmatic strategy to improve the health and well-being of women, newborns, and children. This article documents the intervention package and evaluation design of a study conducted in a rural district of Bangladesh to evaluate the effects of an integrated, community-based MNH and postpartum family planning program on contraceptive use and birth-interval lengths. The study integrated family planning counseling within 5 community health worker (CHW)-household visits to pregnant and postpartum women, while a community mobilizer (CM) led community meetings on the importance of postpartum family planning and pregnancy spacing for maternal and child health. The CM and the CHWs emphasized 3 messages: (1) Use of the Lactational Amenorrhea Method (LAM) during the first 6 months postpartum and transition to another modern contraceptive method; (2) Exclusive, rather than fully or nearly fully, breastfeeding to support LAM effectiveness and good infant breastfeeding practices; (3) Use of a modern contraceptive method after a live birth for at least 24 months before attempting another pregnancy (a birth-to-birth interval of about 3 years) to support improved infant health and nutrition. CHWs provided only family planning counseling in the original study design, but we later added community-based distribution of methods, and referrals for clinical methods, to meet women's demand. Using a quasi-experimental design, and relying primarily on pre/post-household surveys, we selected pregnant women from 4 unions to receive the intervention (n = 2,280) and pregnant women from 4 other unions (n = 2,290) to serve as the comparison group. Enrollment occurred between 2007 and 2009, and data collection ended in January 2013. Formative research showed that women and their family members generally did not perceive

  19. Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan

    Science.gov (United States)

    Jardim, Kevin P.

    Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.

  20. Pre-Planning Civic Action: An Analysis of Civic Leaders' Problem Solving Strategies

    Science.gov (United States)

    Fitzgerald, Jason

    2016-01-01

    This study explores the civic thinking heuristics that civic leaders use when pre-planning action. Across eight think-aloud protocols, findings suggest that three heuristics are employed. "Frame alignment" refers to the process of harmonizing personal beliefs and interests with the particulars of a civic action issue to find personal…

  1. Federal Employees Health Benefits Program (FEHBP) Plan Information

    Data.gov (United States)

    Office of Personnel Management — A list of all Federal Employees Health Benefits Program (FEHBP) plans available in each state, as well as links to the plan brochures, changes for each plan from the...

  2. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  3. Integrating Faith-Based Organizations into State-Funded Pre-K Programs: Resolving Constitutional Conflict. Pre-K Policy Brief Series

    Science.gov (United States)

    Goldman, Dan; Boylan, Ellen

    2010-01-01

    This policy brief addresses federal and state constitutional issues that arise when faith-based organizations participate in state prekindergarten (pre-k) programs and recommends safeguards to ensure that public funding of those programs complies with constitutional principles respecting the separation of church and state and freedom of religion.…

  4. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  5. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  6. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    International Nuclear Information System (INIS)

    Lim, E.Y.; Miller, W.J.; Parkinson, W.J.; Ritzman, R.L.; vonHerrmann, J.L.; Wood, P.J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix

  7. Pre-processing by data augmentation for improved ellipse fitting.

    Science.gov (United States)

    Kumar, Pankaj; Belchamber, Erika R; Miklavcic, Stanley J

    2018-01-01

    Ellipse fitting is a highly researched and mature topic. Surprisingly, however, no existing method has thus far considered the data point eccentricity in its ellipse fitting procedure. Here, we introduce the concept of eccentricity of a data point, in analogy with the idea of ellipse eccentricity. We then show empirically that, irrespective of ellipse fitting method used, the root mean square error (RMSE) of a fit increases with the eccentricity of the data point set. The main contribution of the paper is based on the hypothesis that if the data point set were pre-processed to strategically add additional data points in regions of high eccentricity, then the quality of a fit could be improved. Conditional validity of this hypothesis is demonstrated mathematically using a model scenario. Based on this confirmation we propose an algorithm that pre-processes the data so that data points with high eccentricity are replicated. The improvement of ellipse fitting is then demonstrated empirically in real-world application of 3D reconstruction of a plant root system for phenotypic analysis. The degree of improvement for different underlying ellipse fitting methods as a function of data noise level is also analysed. We show that almost every method tested, irrespective of whether it minimizes algebraic error or geometric error, shows improvement in the fit following data augmentation using the proposed pre-processing algorithm.

  8. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  9. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  10. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  11. The Planning of Straight Line Trajectory in Robotics Using Interactive Graphics

    Directory of Open Access Journals (Sweden)

    Kesheng Wang

    1987-07-01

    Full Text Available The planning of straight line trajectory using the interactive computer graphics simulation of robot manipulator movement is discussed. This new approach to straight line motion planning improves the 'bound deviation joint paths' developed by R. M. Taylor (1979. The new approach has three characteristics: (1 linear interpolation in joint space; (2 unequal intervals for interpolating knot points; (3 using interactive computer graphics to assure that the maximum deviation in the whole segment is less than the pre-specified values. The structure and mathematical basis of a computer program developed for this purpose are presented.

  12. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  13. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  14. Software Engineering Improvement Activities/Plan

    Science.gov (United States)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  15. Review and summary of Solar Thermal Conversion Program planning assistance

    Energy Technology Data Exchange (ETDEWEB)

    1975-06-01

    The Solar Thermal Conversion Program comprises a major part of the national solar energy program which must be continuously reviewed and modified where necessary. Modifications are typically required to reflect technical achievements and uncertainties which arise from within the program or from other technical programs, changes in budgets available for supporting the program as well as internal program funding priorities, changing goals such as through acceleration or stretch-out of the program schedule, significant organizational changes involving responsible governmental agencies, the introduction of new project management support contractors, and required budget or schedule changes occurring within individual projects that make up the Solar Thermal Conversion Program. The Aerospace Corporation has provided data to assist in planning, review, coordination, and documentation of the overall Solar Thermal Conversion Program. The Solar Thermal Conversion Program Plan is described in detail. Sections 2.0 through 5.0 cover the discussion and detail planning covering the objectives, justification, basic and alternative plans, budgets, and schedules for the Solar Thermal sub-unit portion of the Solar Electric Applications effort. Appendices B1, B2, and B3 include the March 21, March 28, and April 5, 1975, Program Plan submissions of the complete Solar Electric Applications effort. In Appendix B the Solar Thermal, Solar Photovoltaic, Wind Energy, and Ocean Thermal sub-unit texts have been condensed and formatted for integration in the overall ERDA budget package. (WHK)

  16. Using Optimization to Improve Test Planning

    Science.gov (United States)

    2017-09-01

    OPTIMIZATION TO IMPROVE TEST PLANNING by Arlene M. Payne September 2017 Thesis Advisor: Jeffrey E. Kline Second Reader: Oleg A. Yakimenko THIS... Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2017 3. REPORT TYPE AND DATES COVERED Master’s...thesis 4. TITLE AND SUBTITLE USING OPTIMIZATION TO IMPROVE TEST PLANNING 5. FUNDING NUMBERS 6. AUTHOR(S) Arlene M. Payne 7. PERFORMING ORGANIZATION

  17. Essential pre-pregnancy and pregnancy interventions for improved maternal, newborn and child health

    Science.gov (United States)

    2014-01-01

    The statistics related to pregnancy and its outcomes are staggering: annually, an estimated 250000-280000 women die during childbirth. Unfortunately, a large number of women receive little or no care during or before pregnancy. At a period of critical vulnerability, interventions can be effectively delivered to improve the health of women and their newborns and also to make their pregnancy safe. This paper reviews the interventions that are most effective during preconception and pregnancy period and synergistically improve maternal and neonatal outcomes. Among pre-pregnancy interventions, family planning and advocating pregnancies at appropriate intervals; prevention and management of sexually transmitted infections including HIV; and peri-conceptual folic-acid supplementation have shown significant impact on reducing maternal and neonatal morbidity and mortality. During pregnancy, interventions including antenatal care visit model; iron and folic acid supplementation; tetanus Immunisation; prevention and management of malaria; prevention and management of HIV and PMTCT; calcium for hypertension; anti-Platelet agents (low dose aspirin) for prevention of Pre-eclampsia; anti-hypertensives for treating severe hypertension; management of pregnancy-induced hypertension/eclampsia; external cephalic version for breech presentation at term (>36 weeks); management of preterm, premature rupture of membranes; management of unintended pregnancy; and home visits for women and children across the continuum of care have shown maximum impact on reducing the burden of maternal and newborn morbidity and mortality. All of the interventions summarized in this paper have the potential to improve maternal mortality rates and also contribute to better health care practices during preconception and periconception period. PMID:25178042

  18. Comparison of skin sensory thresholds using pre-programmed or single-frequency transcutaneous electrical nerve stimulation.

    Science.gov (United States)

    Kang, Jong Ho

    2015-12-01

    [Purpose] The purpose of the present study was to compare the sensory thresholds of healthy subjects using pre-programmed or single-frequency transcutaneous electrical nerve stimulation. [Subjects] Ninety healthy adult subjects were randomly assigned to pre-programmed or single-frequency stimulation groups, each consisting of 45 participants. [Methods] Sensory thresholds were measured in the participants' forearms using von Frey filaments before and after pre-programmed or single-frequency transcutaneous electrical nerve stimulation, and the result in values were analyzed. [Results] Significant increases in sensory threshold after stimulation were observed in both groups. However, there were no significant differences between the two groups in sensory thresholds after stimulation or in the magnitude of threshold increases following stimulation. [Conclusion] Our results show that there are no differences between sensory threshold increases induced by pre-programmed and single-frequency transcutaneous electrical nerve stimulation.

  19. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  20. Natural and accelerated bioremediation research program plan

    International Nuclear Information System (INIS)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE's Office of Environmental Management (EM). The program builds on OHER's tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER's and Office of Energy Research's (OER's) commitment to supporting DOE's environmental management mission and the belief that bioremediation is an important part of the solution to DOE's environmental problems

  1. Low-level radioactive waste research program plan

    International Nuclear Information System (INIS)

    O'Donnell, E.; Lambert, J.

    1989-11-01

    The Waste Management Branch, Division of Engineering, Office of Nuclear Regulatory Research, has developed a strategy for conducting research on issues of concern to the US Nuclear Regulatory Commission (NRC) in its efforts to ensure safe disposal of low-level radioactive waste (LLW). The resulting LLW research program plan provides an integrated framework for planning the LLW research program to ensure that the program and its products are responsive and timely for use in NRC's LLW regulatory program. The plan discusses technical and scientific issues and uncertainties associated with the disposal of LLW, presents programmatic goals and objectives for resolving them, establishes a long-term strategy for conducting the confirmatory and investigative research needed to meet these goals and objectives, and includes schedules and milestones for completing the research. Areas identified for investigation include waste form and other material concerns, failure mechanisms and radionuclide releases, engineered barrier performance, site characterization and monitoring, and performance assessment. The plan proposes projects that (1) analyze and test actual LLW and solidified LLW under laboratory and field conditions to determine leach rates and radionuclide releases, (2) examine the short- and long-term performance of concrete-enhanced LLW burial structures and high-integrity containers, and (3) attempt to predict water movement and contaminant transport through low permeability saturated media and unsaturated porous media. 4 figs., 3 tabs

  2. The Impact of a Primary Care Education Program Regarding Cancer Survivorship Care Plans: Results from an Engineering, Primary Care, and Oncology Collaborative for Survivorship Health.

    Science.gov (United States)

    Donohue, SarahMaria; Haine, James E; Li, Zhanhai; Trowbridge, Elizabeth R; Kamnetz, Sandra A; Feldstein, David A; Sosman, James M; Wilke, Lee G; Sesto, Mary E; Tevaarwerk, Amye J

    2017-09-20

    Survivorship care plans (SCPs) have been recommended as tools to improve care coordination and outcomes for cancer survivors. SCPs are increasingly being provided to survivors and their primary care providers. However, most primary care providers remain unaware of SCPs, limiting their potential benefit. Best practices for educating primary care providers regarding SCP existence and content are needed. We developed an education program to inform primary care providers of the existence, content, and potential uses for SCPs. The education program consisted of a 15-min presentation highlighting SCP basics presented at mandatory primary care faculty meetings. An anonymous survey was electronically administered via email (n = 287 addresses) to evaluate experience with and basic knowledge of SCPs pre- and post-education. A total of 101 primary care advanced practice providers (APPs) and physicians (35% response rate) completed the baseline survey with only 23% reporting prior receipt of a SCP. Only 9% could identify the SCP location within the electronic health record (EHR). Following the education program, primary care physicians and APPs demonstrated a significant improvement in SCP knowledge, including improvement in their ability to locate one within the EHR (9 vs 59%, p educational program containing information about SCP existence, content, and location in the EHR increased primary care physician and APP knowledge in these areas, which are prerequisites for using SCP in clinical practice.

  3. Pre-Service Music Teachers' Metaphorical Perceptions of the Concept of a Music Teaching Program

    Science.gov (United States)

    Kiliç, Deniz Beste Çevik

    2017-01-01

    This study was intended to reveal pre-service music teachers' perceptions of the concept of a "music teaching program" with the use of metaphors. Its sample included 130 pre-service music teachers in the Music Teaching Program of Fine Arts Teaching Department in Balikesir University's Education Faculty. The study data were collected by…

  4. Montessori Public School Pre-K Programs and the School Readiness of Low-Income Black and Latino Children.

    Science.gov (United States)

    Ansari, Arya; Winsler, Adam

    2014-11-01

    Within the United States, there are a variety of early education models and curricula aimed at promoting young children's pre-academic, social, and behavioral skills. This study, using data from the Miami School Readiness Project (MSRP; Winsler et al., 2008, 2012), examined the school readiness gains of low-income Latino ( n = 7,045) and Black children ( n = 6,700) enrolled in two different types of Title-1 public school pre-K programs: those in programs using the Montessori curricula and those in more conventional programs using the High/Scope curricula with a literacy supplement. Parents and teachers reported on children's socio-emotional and behavioral skills with the Devereux Early Childhood Assessment (DECA), while children's pre-academic skills (cognitive, motor, and language) were assessed directly with the Learning Accomplishment Profile Diagnostic (LAP-D) at the beginning and end of their four-year-old pre-K year. All children, regardless of curricula, demonstrated gains across pre-academic, socio-emotional, and behavioral skills throughout the pre-K year; however, all children did not benefit equally from Montessori programs. Latino children in Montessori programs began the year at most risk in pre-academic and behavioral skills, yet exhibited the greatest gains across these domains and ended the year scoring above national averages. Conversely, Black children exhibited healthy gains in Montessori, but demonstrated slightly greater gains when attending more conventional pre-K programs. Findings have implications for tailoring early childhood education programs for Latino and Black children from low-income communities.

  5. Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1

    International Nuclear Information System (INIS)

    1995-09-01

    The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries

  6. FFTF-cycle 10 program and future plan

    Science.gov (United States)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  7. Seismic safety margin research program. Program plan, Revision I

    International Nuclear Information System (INIS)

    Smith, P.D.; Tokarz, F.J.; Bernreuter, D.L.; Cummings, G.E.; Chou, C.K.; Vagliente, V.N.

    1978-01-01

    The overall objective of the SSMRP is to develop mathematical models that realistically predict the probability of radioactive releases from seismically induced events in nuclear power plants. These models will be used for four purposes: (1) To perform sensitivity studies to determine the weak links in seismic methodology. The weak links will then be improved by research and development. (2) To estimate the probability of release for a plant. It is believed that the major difficulty in the program will be to obtain acceptably small confidence limits on the probability of release. (3) To estimate the conservatisms in the Standard Review Plan (SRP) seismic design methodology. This will be done by comparing the results of the SRP methodology and the methodology resulting from the research and development in (1). (4) To develop an improved seismic design methodology based on probability. The Phase I objective proposed in this report is to develop mathematical models which will accomplish the purposes No. 1 and No. 2 with simplified assumptions such as linear elastic analysis, limited assessment on component fragility (considering only accident sequences leading to core melt), and simplified safety system

  8. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  9. Stability, structure and scale: improvements in multi-modal vessel extraction for SEEG trajectory planning.

    Science.gov (United States)

    Zuluaga, Maria A; Rodionov, Roman; Nowell, Mark; Achhala, Sufyan; Zombori, Gergely; Mendelson, Alex F; Cardoso, M Jorge; Miserocchi, Anna; McEvoy, Andrew W; Duncan, John S; Ourselin, Sébastien

    2015-08-01

    Brain vessels are among the most critical landmarks that need to be assessed for mitigating surgical risks in stereo-electroencephalography (SEEG) implantation. Intracranial haemorrhage is the most common complication associated with implantation, carrying significantly associated morbidity. SEEG planning is done pre-operatively to identify avascular trajectories for the electrodes. In current practice, neurosurgeons have no assistance in the planning of electrode trajectories. There is great interest in developing computer-assisted planning systems that can optimise the safety profile of electrode trajectories, maximising the distance to critical structures. This paper presents a method that integrates the concepts of scale, neighbourhood structure and feature stability with the aim of improving robustness and accuracy of vessel extraction within a SEEG planning system. The developed method accounts for scale and vicinity of a voxel by formulating the problem within a multi-scale tensor voting framework. Feature stability is achieved through a similarity measure that evaluates the multi-modal consistency in vesselness responses. The proposed measurement allows the combination of multiple images modalities into a single image that is used within the planning system to visualise critical vessels. Twelve paired data sets from two image modalities available within the planning system were used for evaluation. The mean Dice similarity coefficient was 0.89 ± 0.04, representing a statistically significantly improvement when compared to a semi-automated single human rater, single-modality segmentation protocol used in clinical practice (0.80 ± 0.03). Multi-modal vessel extraction is superior to semi-automated single-modality segmentation, indicating the possibility of safer SEEG planning, with reduced patient morbidity.

  10. An Integrative Approach to Improving an Introductory Weather & Climate Course and Developing an Allied NASA Earth & Space Science Certificate Program for Pre-service Secondary Teachers (Invited)

    Science.gov (United States)

    Morrow, C. A.; Martin-Hansen, L.; Diem, J.; Elliott, W.

    2009-12-01

    An Atlanta-based partnership made up of leaders in science, education, and Georgia’s state-wide STEM Education Initiative are creating an enduring legacy of climate science education for pre-service and in-service teachers in Georgia as well as for underrepresented high school students who participate in an "Early College" program with Georgia State University (GSU). The core elements of our NASA-funded program are to infuse NASA global climate change resources and best pedagogical practice into a popular 4-credit lecture/lab course called “Introduction to Weather & Climate” (GEOG 1112) at GSU, and to establish a sustainable academic program for pre-service teachers in the College of Education called the NASA Earth & Space Science (ESS) Teacher Certificate. The NASA ESS Certificate will require candidates to accomplish the following as part of (or in addition to) standard degree and licensure requirements: 1. successfully complete a graduate section of “Introduction to Weather and Climate” (GEOG 7112), which requires lesson planning related to course content and engagement with GSU's new CO2 monitoring station whose research-quality data will provide unique hands-on opportunities for Metro Atlanta students and teachers; 2) complete an additional advanced course in climate change (GEOG 6784) plus elective hours in physical science disciplines (e.g. astronomy and physics); 3) serve as a lab teaching assistant for GEOG 1112 and a coach for a cadre of Carver Early College students who are taking the course; 4) make at least one of two teaching practica at a Georgia-based NASA Explorer School; and 5) participate or co-present in a week-long, residential, field-based, Summer Institute in Earth & Space Science intended to increase the interest, knowledge, and ability of in-service secondary science educators to fulfill climate-related standards in Earth Science and Earth Systems Science. We will evaluate, document, and disseminate (to the University System of

  11. Langley Research Center Strategic Plan for Education

    Science.gov (United States)

    Proctor, Sandra B.

    1994-01-01

    Research assignment centered on the preparation of final draft of the NASA Langley Strategic Plan for Education. Primary research activity consisted of data collection, through interviews with LaRC Office of Education and NASA Headquarters staff, university administrators and faculty, and school administrators / teachers; and documentary analysis. Pre-college and university programs were critically reviewed to assure effectiveness, support of NASA and Langley's mission and goals; National Education Goals; and educational reform strategies. In addition to these mandates, pre-college programs were reviewed to address present and future LaRC activities for teacher enhancement and preparation. University programs were reviewed with emphasis on student support and recruitment; faculty development and enhancement; and LaRC's role in promoting the utilization of educational technologies and distance learning. The LaRC Strategic Plan for Education will enable the Office of Education to provide a focused and well planned continuum of education programs for students, teachers and faculty. It will serve to direct and focus present activities and programs while simultaneously offering the flexibility to address new and emerging directions based on changing national, state, and agency trends.

  12. 77 FR 42914 - Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance...

    Science.gov (United States)

    2012-07-20

    ... Federal Flexible Benefits Plan: Pre-Tax Payment of Health Benefits Premiums AGENCY: Office of Personnel... this proposed rule; and (4) update the Federal Flexible Benefits Plan: Pre-Tax Payment of Health...--FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENTS OF HEALTH BENEFITS PREMIUMS PROGRAM 8. The authority...

  13. Analysis of Work Performance of Family Planning Field Workers in Male Family Planning Program in Cilacap District

    OpenAIRE

    Suryani, Untari Fajar; Nurjazuli, Nurjazuli; Arso, Septo Pawelas

    2013-01-01

    Target of MDG's to reach maternal mortality rate of 102/100.000 live-births and infantmortality rate of 23/1000 live-births had been performed by improving maternal health throughincreasing contraceptive prevalence rate and decreasing unmet need. Percentage of male withpermanent birth control in Cilacap district was in the lowest rank, 0.16%. Success of familyplanning program could not be separated from work performance of PLKB (family planning field workers); assessment of PLKB work performa...

  14. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  15. Employing continuous quality improvement in community-based substance abuse programs.

    Science.gov (United States)

    Chinman, Matthew; Hunter, Sarah B; Ebener, Patricia

    2012-01-01

    This article aims to describe continuous quality improvement (CQI) for substance abuse prevention and treatment programs in a community-based organization setting. CQI (e.g., plan-do-study-act cycles (PDSA)) applied in healthcare and industry was adapted for substance abuse prevention and treatment programs in a community setting. The authors assessed the resources needed, acceptability and CQI feasibility for ten programs by evaluating CQI training workshops with program staff and a series of three qualitative interviews over a nine-month implementation period with program participants. The CQI activities, PDSA cycle progress, effort, enthusiasm, benefits and challenges were examined. Results indicated that CQI was feasible and acceptable for community-based substance abuse prevention and treatment programs; however, some notable resource challenges remain. Future studies should examine CQI impact on service quality and intended program outcomes. The study was conducted on a small number of programs. It did not assess CQI impact on service quality and intended program outcomes. Practical implications- This project shows that it is feasible to adapt CQI techniques and processes for community-based programs substance abuse prevention and treatment programs. These techniques may help community-based program managers to improve service quality and achieve program outcomes. This is one of the first studies to adapt traditional CQI techniques for community-based settings delivering substance abuse prevention and treatment programs.

  16. Natural and accelerated bioremediation research program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  17. Performance improvement plan in customer technical services

    International Nuclear Information System (INIS)

    Lachambre, L.

    1995-01-01

    This presentation centred around the philosophy, goals, and initiatives associated with Gaz Metropolitain's performance improvement plan. Various aspects of the plan including customer surveys, new customer service policies, the creation of small working units, the decentralization of the Montreal service department, and customer-harmonized shift schedules were explored. Implementation of new service plans and contracts, the formation of improvement groups related to human resources, human resource and productivity management, leadership training, and the use of performance indicators were also explained

  18. Jordan's 2002 to 2012 Fertility Stall and Parallel USAID Investments in Family Planning: Lessons From an Assessment to Guide Future Programming.

    Science.gov (United States)

    Spindler, Esther; Bitar, Nisreen; Solo, Julie; Menstell, Elizabeth; Shattuck, Dominick

    2017-12-28

    Health practitioners, researchers, and donors are stumped about Jordan's stalled fertility rate, which has stagnated between 3.7 and 3.5 children per woman from 2002 to 2012, above the national replacement level of 2.1. This stall paralleled United States Agency for International Development (USAID) funding investments in family planning in Jordan, triggering an assessment of USAID family planning programming in Jordan. This article describes the methods, results, and implications of the programmatic assessment. Methods included an extensive desk review of USAID programs in Jordan and 69 interviews with reproductive health stakeholders. We explored reasons for fertility stagnation in Jordan's total fertility rate (TFR) and assessed the effects of USAID programming on family planning outcomes over the same time period. The assessment results suggest that the increased use of less effective methods, in particular withdrawal and condoms, are contributing to Jordan's TFR stall. Jordan's limited method mix, combined with strong sociocultural determinants around reproduction and fertility desires, have contributed to low contraceptive effectiveness in Jordan. Over the same time period, USAID contributions toward increasing family planning access and use, largely focused on service delivery programs, were extensive. Examples of effective initiatives, among others, include task shifting of IUD insertion services to midwives due to a shortage of female physicians. However, key challenges to improved use of family planning services include limited government investments in family planning programs, influential service provider behaviors and biases that limit informed counseling and choice, pervasive strong social norms of family size and fertility, and limited availability of different contraceptive methods. In contexts where sociocultural norms and a limited method mix are the dominant barriers toward improved family planning use, increased national government investments

  19. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  20. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  1. Developing the strategic plan for pollution prevention in defense programs

    International Nuclear Information System (INIS)

    Marchetti, John A.; Betschart, James F.; Suffern, J. Samuel

    1992-01-01

    In order to provide effective leadership and to ensure a consistent pollution prevention effort in all of its production facilities and laboratories, Defense Programs (DP) Headquarters, in close cooperation with the Field, has developed a strategic plan for its Pollution Prevention Program. The strategic plan is built upon the history of waste minimization, waste reduction, and pollution prevention activity to date, and articulates both long- and short-term strategies to ensure program initiation, growth, and stability. The organization of the program, including Headquarters staffing and linkages to the Geld, is described. Life-cycle analysis of program barriers and bottlenecks, along with associated initiatives and action plans are discussed. (author)

  2. Community-based home-care program for the management of pre-eclampsia: an alternative.

    OpenAIRE

    Helewa, M; Heaman, M; Robinson, M A; Thompson, L

    1993-01-01

    OBJECTIVE: To evaluate the safety, acceptability and cost of a community-based home-care program for the management of mild pre-eclampsia. DESIGN: A descriptive study of outcomes between Apr. 1, 1985, and Dec. 31, 1989. SETTING: St. Boniface General Hospital, Winnipeg. PATIENTS: Urban Winnipeg residents between 27 and 40 weeks' gestation with mild pre-eclampsia who demonstrated acceptance and compliance with home-care management; 321 patients of 1330 were enrolled in the program. INTERVENTION...

  3. Physical Activity and Improvement of Glycaemia in Pre-diabetes by Different Diagnostic Criteria

    DEFF Research Database (Denmark)

    Færch, Kristine; Witte, Daniel Rinse; Brunner, Eric

    2017-01-01

    Context: The effects of physical activity (PA) on improvement of glycaemia may differ between pre-diabetic individuals defined by OGTT versus HbA1c. Objective: We studied the association between PA and improvement of glycaemia in individuals with pre-diabetes defined by glucose versus HbA1c...... criteria. Design, setting and participants: From the Whitehall II study, 957 participants with pre-diabetes defined by isolated impaired fasting glucose (i-IFG), isolated impaired glucose tolerance (IGT) or both (IFG+IGT), and 457 with pre-diabetes defined by HbA1c were included. Main outcome measures......-up, 405 (42%) individuals with glucose-defined pre-diabetes reverted to NGT. A 5-year increase in moderate-to-vigorous-intensity PA was associated with improvements in insulin sensitivity and beta-cell function, but PA was not generally associated with reversion to NGT. Only among women ≥50 years with i...

  4. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  5. Light Water Reactor Sustainability Program Integrated Program Plan

    International Nuclear Information System (INIS)

    Griffith, George; Youngblood, Robert; Busby, Jeremy; Hallbert, Bruce; Barnard, Cathy; McCarthy, Kathryn

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  6. Light Water Reactor Sustainability Program Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  7. Airport Capital Improvement Planning: Stewardship for Airport Development

    Science.gov (United States)

    1997-09-01

    "Airport Capital Improvement Planning: Stewardship for Airport Development", was : originally written in October, 1995. It documented an effort to implement the : concept of capital improvement planning with the airport development industry. : Airpor...

  8. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  9. Atrial electrogram interpretation improves after an innovative education program.

    Science.gov (United States)

    Preston, Julie L; Currey, Judy; Considine, Julie

    2015-01-01

    To avoid adverse patient outcomes from inappropriate treatment, it is recommended that an atrial electrogram (AEG) be recorded whenever atrial arrhythmias develop in patients after cardiac surgery. However, AEGs are not commonly performed because nurses lack knowledge about differentiating atrial rhythms on AEGs. To investigate whether completing a novel online evidence-based education program on interpreting AEGs would improve critical care nurses' AEG interpretation. Specialized critical care nurses were taught about obtaining and interpreting atrial rhythms on AEGs using a 42-minute online mini-movie. AEG interpretation was assessed pre and two and eight weeks post-intervention. AEG interpretation increased two weeks post intervention and was retained at eight weeks. Some participants used this newly acquired knowledge to interpret arrhythmias that were not taught during the education program. Accurate interpretation of AEGs is an easy skill for specialized critical care nurses to learn via an online education program.

  10. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  11. SU-C-202-01: Incorporating Time-Dependent Hypoxia in IMRT Planning

    Energy Technology Data Exchange (ETDEWEB)

    Roy, A [Bowling Green State University, Bowling Green, OH (United States); Nohadani, O [Northwestern University Evanston, IL (United States)

    2016-06-15

    Purpose: To incorporate uncertainties in oxygenation of tumor cells into radiation therapy planning via robust optimization. The model is demonstrated using a clinical prostate cancer case. Methods: The tumor oxygenation levels are determined based on pre- and mid-treatment PET scans. To account for oxygenation changes, we use a radio-sensitivity factor for the effective dose necessary to treat hypoxic cells. Due to the unpredictable nature of re-oxygenation of hypoxic cells, the radio-sensitivity factor and its change is modeled to reside in a time-dependent uncertainty set. This uncertainty can adapt to both pre- and mid-treatment scans, resulting in a two-stage robust treatment planning model. We develop a robust counterpart reformulation that transforms the original NP-hard problem into a linear program consisting of finitely many linear constraints, which can be solved efficiently. Results: The robust plan is compared to both the corresponding fractionated plan which ignores hypoxia, and to the commonly practiced dose-escalated plan that uniformly increases dose based on initial oxygen concentrations. For PTV, the robust plan improves D{sub 50}, D{sub 95}, and EUD by 4% on average compared to fractionated, and by 11% compared to the optimal escalated plan. Moreover, the robust plan spared organs at risk similar to the fractionated plan, while the escalated plan led to over 170% increase of Bladder D{sub 30}. Conclusion: The proposed robust adaptive model can improve tumor coverage by increasing dose to hypoxic tumor voxels that is overlooked by common fractionated treatments. In addition, the robust model anticipates the re-oxygenation process, thus reducing the excess dose at later fractions in comparison to uniform dose-escalation methods.

  12. Highly enriched uranium (HEU) storage and disposition program plan

    International Nuclear Information System (INIS)

    Arms, W.M.; Everitt, D.A.; O'Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables

  13. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  14. Progress in improving provincial plans for nutrition through targeted technical assistance and local advocacy in Vietnam.

    Science.gov (United States)

    Harris, Jody; Nguyen, Phuong H; To, Quyen; Frongillo, Edward A; Menon, Purnima

    2016-12-01

    Vietnam has been decentralizing nutrition planning to provinces, which could help with local relevance and accountability. Assessment in 2009 found a continuing top-down approach, limited human capacity, and difficulty in integrating multiple sectors. Alive and Thrive (A&T) provided targeted assistance and capacity-building for 15 provincial plans for nutrition (PPNs). We aimed to (i) assess PPN content and quality improvements 2009-2014, and (ii) explain processes through which change occurred. Data consisted of interview-based assessments of provincial planning processes, annual PPN assessments, and tracking of A&T involvement. At endline, some provinces produced higher quality plans. Local planning skills improved, but capacity remained insufficient. Awareness of and support for nutrition improved, but some policy and legal environments were contradictory. Objectives were clearer, but use of data for planning remained inconsistent. Provinces became more proactive and creative, but remained constrained by slow approval processes and insufficient funding. Targeted assistance and local advocacy can improve decentralized planning, with success dependent on policy and programming contexts and ability to overcome constraints around capacity, investment, data use and remnants of centralized planning. We recommend strong engagement with planners at the national level to understand how to unblock major constraints; solutions must take into consideration the particular political, financial and administrative context. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.

  15. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  16. Image Processing of Welding Procedure Specification and Pre-process program development for Finite Element Modelling

    International Nuclear Information System (INIS)

    Kim, K. S.; Lee, H. J.

    2009-11-01

    PRE-WELD program, which generates automatically the input file for the finite element analysis on the 2D butt welding at the dissimilar metal weld part, was developed. This program is pre-process program of the FEM code for analyzing the residual stress at the welding parts. Even if the users have not the detail knowledge for the FEM modelling, the users can make the ABAQUS INPUT easily by inputting the shape data of welding part, the weld current and voltage of welding parameters. By using PRE-WELD program, we can save the time and the effort greatly for preparing the ABAQUS INPUT for the residual stress analysis at the welding parts, and make the exact input without the human error

  17. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  18. Experimental program plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  19. Experimental program plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included

  20. Quality and Characteristics of the North Carolina Pre-Kindergarten Program: 2011-2012 Statewide Evaluation. Executive Summary

    Science.gov (United States)

    Peisner-Feinberg, Ellen; Schaaf, Jennifer; Hildebrandt, Lisa; LaForett, Dore

    2013-01-01

    The North Carolina Pre-Kindergarten Program (NC Pre-K) is a state-funded initiative for at-risk 4-year-olds, designed to provide a high quality, classroom-based educational program during the year prior to kindergarten entry. Children are eligible for NC Pre-K based on age, family income (at or below 75% of state median income), and other risk…

  1. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    International Nuclear Information System (INIS)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-01-01

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA

  2. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Alan, E-mail: alan.bond@uea.ac.uk [InteREAM (Interdisciplinary Research in Environmental Assessment and Management), School of Environmental Sciences, University of East Anglia, Norwich, NR4 7TJ (United Kingdom); Cave, Ben, E-mail: ben.cave@bcahealth.co.uk [Ben Cave Associates Ltd., Leeds (United Kingdom); Ballantyne, Rob, E-mail: robdballantyne@gmail.com [Planning and Health Consultant, Oxfordshire (United Kingdom)

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  3. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    Science.gov (United States)

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  4. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  5. Implementation and Analysis of a Lean Six Sigma Program in Microsurgery to Improve Operative Throughput in Perforator Flap Breast Reconstruction.

    Science.gov (United States)

    Hultman, Charles Scott; Kim, Sendia; Lee, Clara N; Wu, Cindy; Dodge, Becky; Hultman, Chloe Elizabeth; Roach, S Tanner; Halvorson, Eric G

    2016-06-01

    Perforator flaps have become a preferred method of breast reconstruction but can consume considerable resources. We examined the impact of a Six Sigma program on microsurgical breast reconstruction at an academic medical center. Using methods developed by Motorola and General Electric, we applied critical pathway planning, workflow analysis, lean manufacturing, continuous quality improvement, and defect reduction to microsurgical breast reconstruction. Primary goals were to decrease preoperative-to-cut time and total operative time, through reduced variability and improved efficiency. Secondary goals were to reduce length of stay, complications, and reoperation. The project was divided into 3 phases: (1) Pre-Six Sigma (24 months), (2) Six Sigma (10 months), (3) and Post-Six Sigma (24 months). These periods (baseline, intervention, control) were compared by Student t test and χ analysis. Over a 5-year period, 112 patients underwent 168 perforator flaps for breast reconstructions, by experienced microsurgeons. Total operative time decreased from 714 to 607 minutes (P Six Sigma program in microsurgical breast reconstruction was associated with better operational and financial outcomes. These incremental gains were maintained over the course of the study, suggesting that these benefits were due, in part, to process improvements. However, continued reductions in total operative time and length of stay, well after the intervention period, support the possibility that "learning curve" phenomenon may have contributed to the improvement in these outcomes.

  6. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  7. Improving student understanding in web programming material through multimedia adventure games

    Science.gov (United States)

    Fitriasari, N. S.; Ashiddiqi, M. F.; Nurdin, E. A.

    2018-05-01

    This study aims to make multimedia adventure games and find out the improvement of learners’ understanding after being given treatment of using multimedia adventure game in learning Web Programming. Participants of this study are students of class X (ten) in one of the Vocational Schools (SMK) in Indonesia. The material of web programming is a material that difficult enough to be understood by the participant therefore needed tools to facilitate the participants to understand the material. Solutions offered in this study is by using multimedia adventures game. Multimedia has been created using Construct2 and measured understood with method Non-equivalent Control Group Design. Pre-test and post-test has given to learners who received treatment using the multimedia adventure showed increase in understanding web programming material.

  8. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  9. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Science.gov (United States)

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor...

  10. SRS ES ampersand H standards compliance program management plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan

  11. Women’s experiences after Planned Parenthood’s exclusion from a family planning program in Texas☆

    Science.gov (United States)

    Woo, C. Junda; Alamgir, Hasanat; Potter, Joseph E.

    2016-01-01

    Objective We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. Study Design We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006–2010 (NSFG). Results (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Conclusions Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Implications Requiring low-income family planning patients to switch healthcare providers has adverse consequences. PMID:26680757

  12. Effects of Supervised Structured Aerobic Exercise Training Program on Interleukin-6, Nitric Oxide Synthase-1, and Cyclooxygenase-2 in Type 2 Diabetes Mellitus.

    Science.gov (United States)

    Karimi, Hossein; Rehman, Syed Shakil Ur; Gillani, Syed Amir

    2017-06-01

    To determine the effects of supervised structured aerobic exercise training (SSAET) program on interleukin-6 (IL-6), nitric oxide synthase 1 (NOS-1), and cyclooxygenase-2 (COX-2) in type 2 diabetes mellitus (T2DM). Randomized controlled trial. Riphah Rehabilitation and Research Centre, Railways General Hospital, Rawalpindi, from January 2015 to June 2016. Patients of either gender of minimum one year history of T2DM ranging from 40-70 years of age were included. Those with chronic systemic diseases, history of regular exercise, smoking, and those on dietary plan were excluded. Atotal of 195 patients were screened; 120 were selected and 102 agreed to participate in the study. They were randomly placed into experimental and control groups. SSAETprogram, routine medication, and dietary plan were applied in experimental group; whereas, control group was managed with routine medication and dietary plan for 25 weeks. IL-6, NOS-1, and COX-2 were assessed at baseline and 25 weeks. SSAET program, routine medication and dietary plan showed significantly improved IL-6 (pre-mean=0.25 ±0.11ng/ml, post-mean=0.19 ±0.04 ng/ml), NOS-1 (pre-median=4.65 ng/ml, IQ range=1.04 ng/ml), (post-median=2.72 ng/ml, IQ range=1.60 ng/ml), and COX-2 (pre-mean=18.72 ±4.42 ng/ml, post-mean=15.18 ±2.63 ng/ml) in experimental group, as compared with control group managed by routine medication and dietary plan, where deterioration was noted in IL-6 (pre-mean=0.23 ±0.08 ng/ml, post-mean=0.27 ±0.08 ng/ml) and COX-2 (pre-mean=18.49 ±4.56 ng/ml, postmean=19.10 ±4.76 ng/ml), while NOS-1 slight improvement (pre-mean=4.99 ng/ml, IQ range=2.67 ng/ml), (postmean=4.56 ng/ml, IQ range=3.85 ng/ml). Statistically at the baseline the p-values were not significant (p>0.05) in both experimental and control groups for IL-6, COX-2 and NOS-1; while after 25 weeks of intervention, the experimental group showed significant improvement (p<0.05) in comparison with the control group. SSAET program, routine

  13. A randomized controlled trial of pre-conception treatment for periodontal disease to improve periodontal status during pregnancy and birth outcomes.

    Science.gov (United States)

    Jiang, Hong; Xiong, Xu; Su, Yi; Zhang, Yiming; Wu, Hongqiao; Jiang, Zhijun; Qian, Xu

    2013-12-09

    Evidence has suggested that periodontal disease is associated with an increased risk of various adverse pregnancy and birth outcomes. However, several large clinical randomized controlled trials failed to demonstrate periodontal therapy during pregnancy reduced the incidence of adverse pregnancy and birth outcomes. It has been suggested that the pre-conception period may be an optimal period for periodontal disease treatment rather than during pregnancy. To date, no randomized controlled trial (RCT) has examined if treating periodontal disease before pregnancy reduces adverse birth outcomes. This study aims to examine if the pre-conception treatment of periodontal disease will lead to improved periodontal status during late pregnancy and subsequent birth outcomes. A sample of 470 (235 in each arm of the study) pre-conception women who plan to conceive within one year and with periodontal disease will be recruited for the study. All participants will be randomly allocated to the intervention or control group. The intervention group will receive free therapy including dental scaling and root planning (the standard therapy), supragingival prophylaxis, and oral hygiene education. The control group will only receive supragingival prophylaxis and oral hygiene education. Women will be followed throughout their pregnancy and then to childbirth. The main outcomes include periodontal disease status in late pregnancy and birth outcomes measured such as mean birth weight (grams), and mean gestational age (weeks). Periodontal disease will be diagnosed through a dental examination by measuring probing depth, clinical attachment loss and percentage of bleeding on probing (BOP) between gestational age of 32 and 36 weeks. Local and systemic inflammatory mediators are also included as main outcomes. This will be the first RCT to test whether treating periodontal disease among pre-conception women reduces periodontal disease during pregnancy and prevents adverse birth outcomes. If

  14. Feed-pump hydraulic performance and design improvement, Phase I: research program design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.; Thompson, W.E.; Wilson, D.G.

    1982-03-01

    As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform the needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume discusses the design, performance and failures of feed pumps, and recommendations for research on pump dynamics, design, and specifications.

  15. Establishing a Nurse Mentor Program to Improve Nurse Satisfaction and Intent to Stay.

    Science.gov (United States)

    Jones, Sara Jane

    Mentoring is an intervention to foster development and socialization of new registered nurses to an organization or unit. A nurse mentor program was developed and implemented with the purpose to improve new registered nurse satisfaction and intent to stay. A pre- and postintervention design was used in a rural emergency department to evaluate nurse job satisfaction and intent to stay in the job. Intent to stay in the job mean scores increased, and the registered nurse participants reported program satisfaction through verbal and written feedback.

  16. DOE-owned spent nuclear fuel program plan

    International Nuclear Information System (INIS)

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines

  17. DOE-owned spent nuclear fuel program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  18. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  19. A continuous quality improvement program to focus a college of pharmacy on programmatic advancement.

    Science.gov (United States)

    Hall, Philip D; Dipiro, Joseph T; Rowen, Randall C; McNair, David

    2013-08-12

    To enhance the achievement of a college of pharmacy's goals for education, research, and service missions by implementing an excellence program based on the Studer Group model for continuous quality improvement. The Studer model was combined with university strategic planning for a comprehensive quality-improvement program that was implemented over 5 years. The program included identifying and measuring key performance indicators, establishing specific "pillar" goals, aligning behaviors with goals and values, and training leaders. Assessment of key performance indicators over 5 years demonstrated progress toward achieving college goals for student and faculty satisfaction, research funding, numbers of students seeking formal postgraduate training, and private giving. Implementation of a continuous quality-improvement program based on the Studer program enabled the college to focus on and meet its yearly and strategic goals for all components of its mission.

  20. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  1. Improving pedagogic competence using an e-learning approach for pre-service mathematics teachers

    Science.gov (United States)

    Retnowati, E.; Murdiyani, N. M.; Marsigit; Sugiman; Mahmudi, A.

    2018-03-01

    This article reported a classroom action research that was aimed to improve student’s pedagogic competence during a course namely Methods of Mathematics Instruction. An asynchronous e-learning approach was provided as supplementary material to the main lecture. This e-learning consisted of selected references and educational website addresses and also facilitated online discussions about various methods of mathematics instructions. The subject was twenty-six pre-service teachers in the Department of Mathematics Education, Yogyakarta State University, Indonesia, conducted by the researchers. The research completed three cycles, where each cycle consisted of plan-action-reflection. Through observation, documentation, and interview, it was concluded that asynchronous e-learning might be used to improve pedagogic competence when direct instruction is also applied in the classroom. Direct instruction in this study provided review, explanation, scheme, and examples which could be used by students to select relevant resources in the e-learning portal. Moreover, the pedagogic competence improved after students accomplished assignments to identify aspects of pedagogic instruction either from analyzing videos in e-learning course or simulating in the classroom with direct commentaries. Supporting factors were enthusiasm, discipline, and interactions among students and lecturer that were built throughout the lectures.

  2. The US Global Change Data and Information Management Program Plan

    International Nuclear Information System (INIS)

    1992-01-01

    The US Global Change Research Program (USGCRP) requires massive quantities of highly diverse data and information to improve our understanding of global change processes. The Committee on Earth and Environmental Sciences (CEES) comprises Federal agencies that need to provide reliable data and information for this purpose from existing programs and archives and from new activities designed to improve upon the data and information. This US Global Change Data and Information Management Program Plan commits the participating Federal agencies to work with each other, with academia, and with the international community to make it as easy as possible for researchers and others to access and use global change data and information. Toward this end, the agencies are organizing a Global Change Data and Information System (GCDIS), which takes advantage of the mission resources and responsibilities of each agency. Sources for global change data and information are national and international agency programs, including those focused on the USGCRP, such as NASA's Earth Observing System [EOS] and other agency global change initiatives and those contributing to the USGCRP from other agency programs not focused on global change. Data and information include raw data from observation systems, value-added data from data assembly activities, and derived data and information from models and other investigations. Additional data and information are identified from appropriate sources including academia and the international community

  3. SPACE 365: Upgraded App for Aviation and Space-Related Information and Program Planning

    Science.gov (United States)

    Williams, S.; Maples, J. E.; Castle, C. E.

    2014-12-01

    Foreknowledge of upcoming events and anniversary dates can be extraordinarily valuable in the planning and preparation of a variety of aviation and Space-related educational programming. Alignment of programming with items "newsworthy" enough to attract media attention on their own can result in effective program promotion at low/no cost. Similarly, awareness and avoidance of dates upon which media and public attention will likely be elsewhere can keep programs from being lost in the noise.NASA has created a useful and entertaining app called "SPACE 365" to help supply that foreknowledge. The app contains an extensive database of historical aviation and Space exploration-related events, along with other events and birthdays to provide socio-historical context, as well as an extensive file of present and future space missions, complete with images and videos. The user can search by entry topic category, date, and key words. Upcoming Events allows the user to plan, participate, and engage in significant "don't miss" happenings.The historical database was originally developed for use at the National Air and Space Museum, then expanded significantly to include more NASA-related information. The CIMA team at NASA MSFC, sponsored by the Planetary Science Division, added NASA current events and NASA educational programming information, and are continually adding new information and improving the functionality and features of the app. Features of SPACE 365 now include: NASA Image of the Day, Upcoming NASA Events, Event Save, Do Not Miss, and Ask Dr. Steve functions, and the CIMA team recently added a new start page and added improved search and navigation capabilities. App users can now socialize the Images of the Day via Twitter, Pinterest, Facebook, and other social media outlets.SPACE 365 is available at no cost from both the Apple appstore and GooglePlay, and has helped NASA, NASM, and other educators plan and schedule programming events. It could help you, too!

  4. Improving enzymatic saccharification of cassava stem using peroxide and microwave assisted pre-treatment techniques

    Directory of Open Access Journals (Sweden)

    Sudha A.

    2017-01-01

    Full Text Available The effectiveness of microwave assisted alkali (MAA and alkaline hydrogen peroxide (AHP pre-treatment methods in improving the enzymatic saccharification of cassava stem was investigated. Ground cassava stems were by MAA method by varying microwave power, NaOH concentration and pre-treatment time. AHP method was performed at various H2O2 concentrations, pre-treatment temperatures and times. The results showed that reducing sugar yield was higher from MAA pretreated stem when compared with AHP pre-treatment, which demonstrated that MAA pre-treatment was effective in releasing sugars. SEM studies on the pre-treated samples revealed extensive distortion of fibres in MAA pre-treated than AHP pre-treated samples, which showed pores and cracks in the fibrous structure. Spectral studies showed the change in the chemical structure of pre-treated samples. The work revealed that the studied pre-treatment methods were effective in improving the enzymatic saccharification of cassava stem.

  5. 'Only systems thinking can improve family planning program in Pakistan': A descriptive qualitative study.

    Science.gov (United States)

    Zafar, Saira; Shaikh, Babar Tasneem

    2014-12-01

    Family Planning (FP) program in Pakistan has been struggling to achieve the desired indicators. Despite a well-timed initiation of the program in late 50s, fertility decline has been sparingly slow. As a result, rapid population growth is impeding economic development in the country. A high population growth rate, the current fertility rate, a stagnant contraceptive prevalence rate and high unmet need remain challenging targets for population policies and FP programs. To accelerate the pace of FP programs and targets concerned, it is imperative to develop and adopt a holistic approach and strategy for plugging the gaps in various components of the health system: service delivery, information systems, drugs-supplies, technology and logistics, Human Resources (HRs), financing, and governance. Hence, World Health Organization (WHO) health systems building blocks present a practical framework for overall health system strengthening. This descriptive qualitative study, through 23 in-depth interviews, explored the factors related to the health system, and those responsible for a disappointing FP program in Pakistan. Provincial representatives from Population Welfare and Health departments, donor agencies and non-governmental organizations involved with FP programs were included in the study to document the perspective of all stakeholders. Content analysis was done manually to generate nodes, sub-nodes and themes. Performance of FP programs is not satisfactory as shown by the indicators, and these programs have not been able to deliver the desired outcomes. Interviewees agreed that inadequate prioritization given to the FP program by successive governments has led to this situation. There are issues with all health system areas, including governance, strategies, funding, financial management, service delivery systems, HRs, technology and logistic systems, and Management Information System (MIS); these have encumbered the pace of success of the program. All stakeholders

  6. Effects of a Technology-Friendly Education Program on Pre-Service Teachers' Perceptions and Learning Styles

    Science.gov (United States)

    Kim, Dong-Joong; Choi, Sang-Ho

    2016-01-01

    A technology-friendly teacher education program can make pre-service teachers more comfortable with using technology from laggard to innovator and change their learning styles in which they prefer the use of technology in teaching. It is investigated how a technology-friendly mathematics education program, which provided 49 pre-service teachers an…

  7. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    Energy Technology Data Exchange (ETDEWEB)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  8. Improving Risk Management and Resiliency: A Plan for a Proactive National Policy on Insurance Practices in FEMA’s Public Assistance Program

    Science.gov (United States)

    2013-12-01

    and reduce insurance costs. 178 Department of Finance and Deregulation , “Managing the Cost of Damage to Road Infrastructure Caused by Natural...MANAGEMENT AND RESILIENCY: A PLAN FOR A PROACTIVE NATIONAL POLICY ON INSURANCE PRACTICES IN FEMA’S PUBLIC ASSISTANCE PROGRAM by Gregory W. Eaton...AND RESILIENCY: A PLAN FOR A PROACTIVE NATIONAL POLICY ON INSURANCE PRACTICES IN FEMA’S PUBLIC ASSISTANCE PROGRAM 5. FUNDING NUMBERS 6. AUTHOR(S

  9. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  10. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  11. NASA program planning on nuclear electric propulsion

    International Nuclear Information System (INIS)

    Bennett, G.L.; Miller, T.J.

    1992-03-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors. 28 refs

  12. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  13. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  14. Task plan for the US Department of Energy TMI-2 programs

    International Nuclear Information System (INIS)

    1982-10-01

    The Task Plan for the US Department of Energy (DOE) Three Mile Island (TMI) Unit 2 Programs identifies the tasks to be planned and administered by the DOE Technical Integration Office (TIO) in a manner which will maximize the use of available resources, obtain the maximum benefit from the opportunities associated with the TMI-2 cleanup effort, and retrieve generically useful information for addressing some of the key problems and issues facing the nuclear power industry. The Plan identifies tasks in three major program areas where DOE has assumed implementation responsibility. The DOE TMI-2 Programs are: Data Acquisition Program, Waste Immobilization Program, and Reactor Evaluation Program. The plan is intended to serve as a management overview by defining the task objective, benefits, and work scope with respect to prioritization of tasks and utilization of resources

  15. A Pilot Study of a 6-Week Parenting Program for Mothers of Pre-school Children Attending Family Health Centers in Karachi, Pakistan

    Directory of Open Access Journals (Sweden)

    Yasmin Khowaja

    2016-02-01

    Full Text Available Background Recently, parenting programs to address behavioural and emotional problems associated with child maltreatment in developing countries have received much attention. There is a paucity of literature on effective parent education interventions in the local context of Pakistan. This study aimed to assess the feasibility of offering a 6-week parenting program for mothers of pre-school children attending family health centres (FHCs in Karachi, the largest metropolitan city of Pakistan. Methods A pilot quasi-experimental trial was conducted. Two FHCs were selected, one as the intervention and the second as the control. A total of 57 mothers of pre-school children (n = 30 intervention; n = 27 control participated in this study. Mothers in the intervention group received SOS Help for parents module, while mothers in the control group received information about routine childcare. A parenting scale (PS was administered before the program was implemented and repeated 2 weeks after the program was completed in both groups. Statistical analysis was performed to compare participants’ attributes. Descriptive analysis was conducted to compare pre- and post-test mean scores along with standard deviation for parenting subscales in the intervention and control groups. Results A total of 50 mothers (n = 25 intervention; n = 25 control completed the 6-week program. Attrition was observed as 5/30 (17% in the intervention arm and 2/27 (2% in the control arm. Mothers commonly reported the burden of daily domestic and social responsibilities as the main reason for dropping out. Furthermore, the majority of participants in the control group recommended increasing the duration of weekly sessions from 1 to 1.5 hours, thereby decreasing the program period from 6 to 4 weeks. Mothers in intervention group reported substantial improvement in parenting skills as indicated by mean difference in their pre- and post-test scores for laxness and over

  16. Social marketing to plan a fall prevention program for Latino construction workers.

    Science.gov (United States)

    Menzel, Nancy N; Shrestha, Pramen P

    2012-08-01

    Latino construction workers experience disparities in occupational death and injury rates. The Occupational Safety and Health Administration funded a fall prevention training program at the University of Nevada, Las Vegas in response to sharp increases in fall-related accidents from 2005 to 2007. The grant's purpose was to improve fall protection for construction workers, with a focus on Latinos. This study assessed the effectiveness of social marketing for increasing fall prevention behaviors. A multi-disciplinary team used a social marketing approach to plan the program. We conducted same day class evaluations and follow-up interviews 8 weeks later. The classes met trainee needs as evidenced by class evaluations and increased safety behaviors. However, Spanish-speaking Latinos did not attend in the same proportion as their representation in the Las Vegas population. A social marketing approach to planning was helpful to customize the training to Latino worker needs. However, due to the limitations of behavior change strategies, future programs should target employers and their obligation to provide safer workplaces. Copyright © 2012 Wiley Periodicals, Inc.

  17. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  18. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  19. Pre-service teacher professional development on climate change: Assessment of workshop success and influence of prior knowledge

    Science.gov (United States)

    Veron, D. E.; Ad-Marbach, G.; Fox-Lykens, R.; Ozbay, G.; Sezen-Barrie, A.; Wolfson, J.

    2017-12-01

    As states move to adopt the next generation science standards, in-service teachers are being provided with professional development that introduces climate change content and best practices for teaching climate change in the classroom. However, research has shown that it is challenging to bring this information into the higher education curriculum in education courses for pre-service teachers due to curricular and programming constraints. Over two years, the Maryland and Delaware Climate Change Assessment and Research (MADE-CLEAR) project explored a professional development approach for pre-service teachers which employed paired workshops that resulted in participant-developed lesson plans based on climate change content. The workshops were designed to provide pre-service teachers with climate change content related to the carbon cycle and to model a variety of techniques and activities for presenting this information in the classroom. Lesson plans were developed between the first and second workshop, presented at the second workshop and discussed with peers and in-service teachers, and then revised in response to feedback from the second workshop. Participant climate change content knowledge was assessed before the first workshop, and after the final revision of the lesson plan was submitted to the MADE-CLEAR team. Climate content knowledge was also assessed using the same survey for additional pre-service teacher groups who did not participate in the professional development. Results show that while the paired workshop approach increased climate content knowledge, the amount of improvement varied depending on the participants' prior knowledge in climate change content. In addition, some alternate conceptions of climate change were not altered by participant involvement in the professional development approach. Revised lesson plans showed understanding of underlying climate change impacts and demonstrated awareness of appropriate techniques for introducing this

  20. NCTPlan. The new PC version of MacNCTPlan improvements and validation of the treatment planning system

    International Nuclear Information System (INIS)

    Gonzalez, S.J.; Santa Cruz, Gustavo A.; Yam, C.S.

    2003-01-01

    Full text: The treatment planning system that has been used routinely in phase-I clinical trials of BNCT at Harvard/MIT consists of the MacNCTPlan interactive planning software coupled to the MCNP 4B Monte Carlo radiation transport code. The physical and mathematical principles of MacNCTPlan as well as its architecture, operation and application have been previously described elsewhere. The use of this software in clinical trials together with a detailed analysis of the code led to the identification of some limitations and deficiencies. The motivation for this PC version, Neutron Capture Therapy Planning, relies basically in two major reasons: the need to integrate the different steps for making a plan and the need to improve some features of the Macintosh version. NCTPlan aims to reproduce all the features and capabilities present in the Macintosh version. Working on this, some deficiencies were corrected and several changes in the interface were performed in order to provide a more friendly and reliable program. Among the changes intended to facilitate the treatment planning process, the most important are the integration of the auxiliary program MPREP to NCTPlan and a great improvement in the visualization of isodose contours. NCTPlan has the ability to show the isodose distributions superimposed on two orthogonal planes of the CT volume, these planes being updated in real time as the orientation of the planes is changed. The major modifications to the mathematical algorithms concerned the material assignment in the geometric model, dose distribution calculations and three-dimensional dose-volume histogram (DVH) derivation. Therefore, NCTPlan provides a user-friendly interface thanks to the integration of the different steps involved in treatment planning. Complete control of the MCNP radiation transport code is under study. Cross-validation of NCTPlan against reference calculations made apparent the improvements performed on the mathematical algorithms

  1. School-based sleep education program improves sleep and academic performance of school-age children.

    Science.gov (United States)

    Gruber, Reut; Somerville, Gail; Bergmame, Lana; Fontil, Laura; Paquin, Soukaina

    2016-05-01

    The objective of this study was to develop and evaluate the effectiveness of a school-based sleep education program aimed at improving the sleep and academic performance of school-age children. Using a community-based participatory research approach, we created a school-based sleep education program, "Sleep for Success"™ (SFS), composed of four distinct modules that addressed the children, their family and community, the school staff, and decision makers within the school setting. Implementation was carried out in three elementary schools. Seventy-one students participated in the evaluation of the program. The effectiveness of the SFS program was evaluated using non-randomized controlled before-and-after study groups (intervention and control) assessed over two time points (pre- and post-program implementation). Before (baseline) and after implementation, sleep and academic performance were measured using actigraphy and report card marks, respectively. In the intervention group, true sleep was extended by 18.2 min per night, sleep efficiency improved by 2.3%, and sleep latency was shortened by 2.3 min, and report card grades in mathematics and English improved significantly. No changes were noted in the control group. Participation in the sleep education program was associated with significant improvements in children's sleep and academic performance. Copyright © 2016 Elsevier B.V. All rights reserved.

  2. The Views of Pre-Service Teachers Who Take Special Teaching Course within the Context of Pedagogical Formation Certificate Program about Micro-Teaching Method and a Physics Lesson Plan

    Science.gov (United States)

    Gurbuz, Fatih

    2015-01-01

    The purpose of this study is to determine the views of the pre-service teachers who received training on pedagogical formation certificate program about micro-teaching method. The study was carried out with a case study method. Semi-structured interviews were used in the study as a data collection tool to gather pre-service teachers' views about…

  3. Computer guided pre-operative planning and dental implant placement

    Directory of Open Access Journals (Sweden)

    Dušan Grošelj

    2007-05-01

    Full Text Available Background: Implants in dentistry are, besides fixed, removable and maxillofacial prosthodontics, one of the reliable possibility to make functional and aesthetic rehabilitation of the edentulism. Surgical and prosthodontic implant complications are often an inattentive consequence of wrong diagnosis, planning, and placement. In this article we present a technique using a highly advanced software program along with a rapid prototyping technology named stereolithography. A planning software for implant placement needs basically the high quality computed tomographic scan of one or both jaws for making accurate preoperative diagnostics and 3D preoperative plan. Later individual drill guide is designed and generated based on both the CT images and the preoperative planning. The patient specific drill guide transfers the virtual planning to the patient’s mouth at time of surgery.Conclusions: The advantages of computer guided implantology are the better prepared surgery with visualisation of critical anatomic structures, assessment of available bone and data about bone quality, increased confidence for the surgeon, deceased operative time, less frequent use of bone grafts, higher quality of collaboration between specialists and prosthetic lab and better communication with patients. Radiographic examination of the operation field for computer guided planning for implant placement is due to high costs justified as the most important information source on the areas to be implanted.

  4. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  5. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  6. Pre-Language Activities for the Profoundly Mentally Retarded.

    Science.gov (United States)

    Poole, Marilyn R.; And Others

    Provided are sample lesson plans for a program to develop pre-language skills in profoundly retarded children and adults. Characteristic of the suggested activities is the stimulation of all sensory channels through structured infant-like play activities in five general areas: oral stimulation, sensory arousal, motor stimulation, vocal play, and…

  7. Design of a continuous quality improvement program to prevent falls among community-dwelling older adults in an integrated healthcare system

    Directory of Open Access Journals (Sweden)

    Yano Elizabeth M

    2009-11-01

    Full Text Available Abstract Background Implementing quality improvement programs that require behavior change on the part of health care professionals and patients has proven difficult in routine care. Significant randomized trial evidence supports creating fall prevention programs for community-dwelling older adults, but adoption in routine care has been limited. Nationally-collected data indicated that our local facility could improve its performance on fall prevention in community-dwelling older people. We sought to develop a sustainable local fall prevention program, using theory to guide program development. Methods We planned program development to include important stakeholders within our organization. The theory-derived plan consisted of 1 an initial leadership meeting to agree on whether creating a fall prevention program was a priority for the organization, 2 focus groups with patients and health care professionals to develop ideas for the program, 3 monthly workgroup meetings with representatives from key departments to develop a blueprint for the program, 4 a second leadership meeting to confirm that the blueprint developed by the workgroup was satisfactory, and also to solicit feedback on ideas for program refinement. Results The leadership and workgroup meetings occurred as planned and led to the development of a functional program. The focus groups did not occur as planned, mainly due to the complexity of obtaining research approval for focus groups. The fall prevention program uses an existing telephonic nurse advice line to 1 place outgoing calls to patients at high fall risk, 2 assess these patients' risk factors for falls, and 3 triage these patients to the appropriate services. The workgroup continues to meet monthly to monitor the progress of the program and improve it. Conclusion A theory-driven program development process has resulted in the successful initial implementation of a fall prevention program.

  8. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  9. Program to improve the effectiveness of education and professional activities of college students

    Directory of Open Access Journals (Sweden)

    I.V. Vlaskina

    2013-04-01

    Full Text Available We describe a training program on “Psychology of effective professional activity”, realized on the basis of the Ural College of the Beauty Industry. The purpose of this discipline is to improve the effectiveness of education and professional activities of college students acquiring professions of “Human-Human” type. To improve effectiveness of education and professional activities, this program provides formation of professionally important qualities of students. The results of the program can be: students’ acquisition of knowledge required for the effective performance of professional activities (ways to prevent burnout, increase self-confidence, etc.; mastery of professional skills (planning, simulation, etc.; formation of professionally important qualities (stress, tolerance, etc.; increasing the efficiency of their professional activities.

  10. Radioactive Waste Management Research Program Plan for high-level waste: 1987

    International Nuclear Information System (INIS)

    1987-05-01

    This plan will identify and resolve technical and scientific issues involved in the NRC's licensing and regulation of disposal systems intended to isolate high level hazardous radioactive wastes (HLW) from the human environment. The plan describes the program goals, discusses the research approach to be used, lays out peer review procedures, discusses the history and development of the high level radioactive waste problem and the research effort to date and describes study objectives and research programs in the areas of materials and engineering, hydrology and geochemistry, and compliance assessment and modeling. The plan also details the cooperative interactions with international waste management research programs. Proposed Earth Science Seismotectonic Research Program plan for radioactive waste facilities is appended

  11. Improving Leadership Preparation Programs through a School, University, and Professional Organization Partnership.

    Science.gov (United States)

    Peel, Henry A.; Wallace, Corinna

    Beginning educational administrators often find that they are unprepared to deal with the realities of school administration. This paper describes how the Halifax County, North Carolina, school system worked with a national organization and an area university to develop a plan to improve its administrator-preparation program. In 1992 the school…

  12. 40 CFR 30.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...

  13. 45 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  14. Family planning program: world review 1974. Introduction.

    Science.gov (United States)

    Watson, W B; Lapham, R J

    1975-08-01

    The 1974 Population Conference at Bucharest was marked with controversy between developed and developing countries, with the latter strongly critical of aid for population control but less for social and economic development. The Plan of Action which was finally approved emphasized the importance of social and economic factors in relation to population growth while recommending that couples in all nations should have access to family planning information. Different regions of the world, however, have widely divergent population policies and goals. The Asia-Pacific region of the developing world, which has 3/4 of the population of the developing world, has articulated a strong stance in favor of reducing birth rates at Post-Bucharest Consultation. Government-supported family planning programs are seen as a high priority item to reduce rapid population growth. Rapid population growth is not seen as a high-priority problem in most African, Arab, and Latin American countries. Population problems will be solved with economic and social advancement. There is more concern in Latin America for family planning as a "human right" issue than to promote demographic goals. Latin America was also concerned with migration/urbanization issues. All of the Regional Consultations after Bucharest favored a greater emphasis on population in development planning, concern for the problems caused by migration and urbanization, improvement in the status of women, and support for the reduction of mortality levels. Some 74 countries containing 93% of the population of the developing world, supported family planning, with only 4 populous countries -- Burma, Ethiopia, Peru, and North Korea not in support. More than 98% of the population of Asia lives in countries which support family planning; the figures are 94% for Latin America, 90% for the Middle East and North Africa and 64% for Sub-Saharan Africa. The governments of 39 countries with a combined population of 2.3 billion have stated that

  15. Light Water Reactor Sustainability Program: Integrated Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-02-15

    proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

  16. Light Water Reactor Sustainability Program: Integrated Program Plan

    International Nuclear Information System (INIS)

    2016-02-01

    and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

  17. The Effect of Task Type and Pre-task Planning Condition on the Accuracy of Intermediate EFL Learners' Writing Performance

    Directory of Open Access Journals (Sweden)

    Seyeed Mohammad Alavi

    2012-05-01

    Full Text Available Task-based language teaching, which requires learners to transact tasks resembling their real life language needs, demands language learners to perform planning at different stages of their learning. Since various types of tasks can be used in task-based instruction, the present study examined the effect of task types and various participatory structures during pre-task planning on the quality of learners' writing performance, (i.e., accuracy. Towards this end, 120 intermediate EFL students were randomly assigned to 3 experimental groups and one control group. While the experimental groups were subjected to different pre-task planning conditions, (i.e., individual, pair, and group, the control group performed tasks without any planning. During the treatment, they experienced task modeling, presentation and completion. A factorial design was followed in the present study, and the collected data were analyzed through ANOVAs that revealed task type and pre-task planning condition influenced the writing accuracy of the participants in a way that resulted in greater accuracy in the decision-making task in the experimental groups, thereby ensuring the effectiveness of the treatment in mitigating the long-standing problem of EFL learners in achieving higher levels of accuracy when a specific task type is concerned.

  18. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  19. Kent County Health Department: Using an Agency Strategic Plan to Drive Improvement.

    Science.gov (United States)

    Saari, Chelsey K

    The Kent County Health Department (KCHD) was accredited by the Public Health Accreditation Board (PHAB) in September 2014. Although Michigan has had a state-level accreditation process for local health departments since the late 1990s, the PHAB accreditation process presented a unique opportunity for KCHD to build on successes achieved through state accreditation and enhance performance in all areas of KCHD programs, services, and operations. PHAB's standards, measures, and peer-review process provided a standardized and structured way to identify meaningful opportunities for improvement and to plan and implement strategies for enhanced performance and established a platform for being recognized nationally as a high-performing local health department. The current case report highlights the way in which KCHD has developed and implemented its strategic plan to guide efforts aimed at addressing gaps identified through the accreditation process and to drive overall improvement within our agency.

  20. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  1. Tank Waste Remediation System Inactive Miscellaneous Underground Storage Tanks Program Plan

    International Nuclear Information System (INIS)

    Gustavson, R.D.

    1995-12-01

    The Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure

  2. An approach to improve Romanian geological repository planning

    International Nuclear Information System (INIS)

    Andrei, Veronica; Prisecaru, Ilie

    2016-01-01

    International standards recommend typical phases to be included within any national program for the development of a geological repository dedicated to disposal of the high level radioactive wastes generated in countries using nuclear power. However, these are not universally applicable and the content of each of these phases may need to be adapted for each national situation and regulatory and institutional framework. Several national geological repository programs have faced failures in schedules and have revised their programs to consider an adapted phased management approach. The authors have observed that in the case of those countries in the early phases of a geological repository program where boundary conditions have not been fully defined, international recommendations for handling delays/failures in the national program might not immediately help. This paper considers a case study of the influences of the national context risks on the current planning schedule of the Romanian national geological repository. It proposes an optimum solution for an integrated response to any significant adverse impact arising from these risks, enabling sustainable program planning

  3. An improved fast and elitist multi-objective genetic algorithm-ANSGA-II for multi-objective optimization of inverse radiotherapy treatment planning

    International Nuclear Information System (INIS)

    Cao Ruifen; Li Guoli; Song Gang; Zhao Pan; Lin Hui; Wu Aidong; Huang Chenyu; Wu Yican

    2007-01-01

    Objective: To provide a fast and effective multi-objective optimization algorithm for inverse radiotherapy treatment planning system. Methods: Non-dominated Sorting Genetic Algorithm-NSGA-II is a representative of multi-objective evolutionary optimization algorithms and excels the others. The paper produces ANSGA-II that makes use of advantage of NSGA-II, and uses adaptive crossover and mutation to improve its flexibility; according the character of inverse radiotherapy treatment planning, the paper uses the pre-known knowledge to generate individuals of every generation in the course of optimization, which enhances the convergent speed and improves efficiency. Results: The example of optimizing average dose of a sheet of CT, including PTV, OAR, NT, proves the algorithm could find satisfied solutions in several minutes. Conclusions: The algorithm could provide clinic inverse radiotherapy treatment planning system with selection of optimization algorithms. (authors)

  4. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  5. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  6. 38 CFR 49.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  7. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  8. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  9. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  10. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  11. NWTS waste package program plan. Volume II. Program logic networks

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  12. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-05-01

    This paper presents the status of technology program planning to develop those Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies with significant development heritage: ion electric propulsion and the SP-100 space nuclear power technologies. Detailed plans are presented for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  13. Brunswick improvement program

    International Nuclear Information System (INIS)

    Howe, P.W.

    1985-01-01

    The performance of the twin 790-MW Mark-4 boiling water reactors located at the Brunswick steam electric plant has historically been well below average. The plant experienced low availability, low capacity factors, high US Nuclear Regulatory Commission (NRC) violations, excessive radioactive waste generation, excessive licensee event reports (LERs), an unacceptable industrial safety record, poor SALP ratings, and numerous other deficiencies leading to unacceptable performance. In June 1982 it was determined that certain periodic tests (PT) had never been performed. While one unit was down for a refueling/modification outage, Carolina Power and Light (CP and L) elected to bring the other unit off line and perform an extensive self-examination. As a result, a number of needed improvements covering a wide range of plant activities were identified. CP and L elected to consolidate all the elements of the improvement into a single, plant-wide program. The consolidated program, called the Brunswick Improvement Program (BIP), was established. Major objectives of the BIP and measurable results are presented

  14. Florida's Prepaid College Tuition Program: Marketing a Pre-Need Service.

    Science.gov (United States)

    Gauff, Joseph F., Jr.

    1994-01-01

    A discussion of Florida's college tuition prepayment program describes the plan and its options and examines its marketing implications as a preneed service. It is concluded that the program makes saving for college easy, economical, and completely safe but requires rethinking of conventional marketing strategies and mix. (MSE)

  15. 22 CFR 145.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...

  16. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  17. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  18. Selenide isotope generator for the Galileo mission. Reliability program plan

    International Nuclear Information System (INIS)

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineated herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work

  19. Obesity and pre-hypertension in family medicine: Implications for quality improvement

    Directory of Open Access Journals (Sweden)

    Anderson Gregory J

    2007-12-01

    Full Text Available Abstract Background. Prevention of pre-hypertension is an important goal for primary care patients. Obesity is a risk factor for hypertension, but has not been addressed for pre-hypertension in primary care populations. The objective of this study was to assess the degree to which obesity independently is associated with risk for pre-hypertension in family medicine patients. Methods. This study was a retrospective analysis of information abstracted from medical records of 707 adult patients. Multivariable logistic regression was used to test the relationship between body mass index (BMI and pre-hypertension, after adjustment for comorbidity and demographic characteristics. Pre-hypertension was defined as systolic pressure between 120 and 139 mm Hg or diastolic pressure between 80 and 89 mm Hg. Results. In our sample, 42.9% of patients were pre-hypertensive. Logistic regression analysis revealed that, in comparison to patients with normal body mass, patients with BMI > 35 had higher adjusted odds of being pre-hypertensive (OR = 4.5, CI 2.55–8.11, p Conclusion. In our sample of family medicine patients, elevated BMI is a risk factor for pre-hypertension, especially BMI > 35. This relationship appears to be independent of age, gender, marital status and comorbidity. Weight loss intervention for obese patients, including patient education or referral to weight loss programs, might be effective for prevention of pre-hypertension and thus should be considered as a potential quality indicator.

  20. Westinghouse Hanford Company waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Craig, P.A.; Nichols, D.H.; Lindsey, D.W.

    1991-08-01

    The purpose of this plan is to establish the Westinghouse Hanford Company's Waste Minimization Program. The plan specifies activities and methods that will be employed to reduce the quantity and toxicity of waste generated at Westinghouse Hanford Company (Westinghouse Hanford). It is designed to satisfy the US Department of Energy (DOE) and other legal requirements that are discussed in Subsection C of the section. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as permitted by DOE Order 5400.1 (DOE 1988a). This plan is based on the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, which directs DOE Field Office, Richland contractors to develop and maintain a waste minimization program. This waste minimization program is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Westinghouse Hanford Waste Minimization Program is designed to prevent or minimize pollutant releases to all environmental media from all aspects of Westinghouse Hanford operations and offers increased protection of public health and the environment. 14 refs., 2 figs., 1 tab

  1. Pre-optimization of radiotherapy treatment planning: an artificial neural network classification aided technique

    International Nuclear Information System (INIS)

    Hosseini-Ashrafi, M.E.; Bagherebadian, H.; Yahaqi, E.

    1999-01-01

    A method has been developed which, by using the geometric information from treatment sample cases, selects from a given data set an initial treatment plan as a step for treatment plan optimization. The method uses an artificial neural network (ANN) classification technique to select a best matching plan from the 'optimized' ANN database. Separate back-propagation ANN classifiers were trained using 50, 60 and 77 examples for three groups of treatment case classes (up to 21 examples from each class were used). The performance of the classifiers in selecting the correct treatment class was tested using the leave-one-out method; the networks were optimized with respect their architecture. For the three groups used in this study, successful classification fractions of 0.83, 0.98 and 0.93 were achieved by the optimized ANN classifiers. The automated response of the ANN may be used to arrive at a pre-plan where many treatment parameters may be identified and therefore a significant reduction in the steps required to arrive at the optimum plan may be achieved. Treatment planning 'experience' and also results from lengthy calculations may be used for training the ANN. (author)

  2. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  3. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  4. Integrating Planning, Assessment, and Improvement in Higher Education

    Science.gov (United States)

    Sherlock, Barbara J.

    2009-01-01

    Based on Penn State's popular "Innovation Insights" series, this book brings together in one handy reference nearly a decade of tried and true insights into continuous quality improvements in higher education. Their five-step model for integrating planning, assessment, and improvement moves plans off the shelf and into the weekly and daily…

  5. A phenomenographic study of students' experiences with transition from pre-college engineering programs to first-year engineering

    Science.gov (United States)

    Salzman, Noah

    Recent national dialogues on the importance of preparing more students for careers in Science, Technology, Engineering, and Mathematics has driven the development of formal and informal learning opportunities for children and adolescents to explore engineering. Despite the growth of these programs, relatively little research exists on how participation in these programs affects students who choose to pursue further study in engineering. The present study addressed this gap through an exploration of the different ways that First-Year Engineering students experience the transition from pre-college engineering to undergraduate engineering studies. Given the focus of this research on students' experiences, phenomenography was chosen to explore the phenomenon of transition from pre-college to first-year engineering at a large, public Midwestern university. This facilitated understanding the range of variation in the ways that students experienced this transition. Twenty-two students with different amounts of participation in a variety of different engineering programs were selected to be interviewed using a purposeful maximum variation sampling strategy. The interviews were guided by a semi-structured interview protocol that encouraged the participants to reflect on their pre-college engineering experiences, their experiences in First-Year Engineering, and the transition between the two domains. The interviews were analyzed using phenomenographic methods to develop an outcome space consisting of five qualitatively different but related ways of experiencing the transition from pre-college to First-Year Engineering. These categories of description included Foreclosure, Frustration, Tedium, Connection, and Engaging Others. With the exception of the first category which was characterized by a lack of passion and commitment to engineering, the remaining four categories formed a hierarchical relationship representing increasing integration in First-Year Engineering. The

  6. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  7. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  8. Closing the gap-cardiovascular risk and primary prevention: results from the American College of Physicians quality improvement program.

    Science.gov (United States)

    Snow, Vincenza; Reynolds, Cara Egan; Bennett, Lia; Weiss, Kevin B; Snooks, Qianna; Qaseem, Amir

    2010-01-01

    The objective was to study the impact of a practice-based quality improvement program on practice teams' care for patients who have increased risk of cardiovascular disease. A total of 54 team members from 18 internal medicine practices participated in an educational program that used a pre-post intervention study design and focused on measures related to cardiovascular risk factors. The program involved live instruction, faculty-led conference calls, practice data collection, and progress reports detailing practices' improvement strategies. Data on 817 patients were reported. Practices showed significant improvement in counseling for diet (70% to 78%), exercise (67% to 74%), and weight loss (64% to 72%). Use of aspirin (53% to 64%) and statins (83% to 89%) also showed significant improvement. Administration of flu vaccine increased significantly from 51% to 54%. Improvements in patient counseling and medication management, if sustained, should lead to fewer cardiovascular events. However, program duration did not allow the capture of outcomes measures improvement.

  9. Incorporating Reporting Efforts to Manage and Improve Health and Wellness Programs.

    Science.gov (United States)

    Wells, Timothy S; Ozminkowski, Ronald J; McGinn, Michael P; Hawkins, Kevin; Bhattarai, Gandhi R; Serxner, Seth A; Greame, Chris

    2017-06-01

    Wellness programs are designed to help individuals maintain or improve their health. This article describes how a reporting process can be used to help manage and improve a wellness program. Beginning in 2014, a wellness pilot program became available in New Jersey for individuals with an AARP Medicare Supplement Insurance plan insured by UnitedHealthcare Insurance Company. The program has since expanded to include Missouri, Texas, Alabama, and Washington. This wellness program includes an online health portal, one-on-one telephonic coaching, gym membership discounts, and local health events. To assure smooth program operations and alignment with program objectives, weekly and monthly reports are produced. The weekly report includes metrics on member engagement and utilization for the aforementioned 4 program offerings and reports on the last 4 weeks, as well as for the current month and the current year to date. The monthly report includes separate worksheets for each state and a summary worksheet that includes all states combined, and provides metrics on overall engagement as well as utilization of the 4 program components. Although the monthly reports were used to better manage the 4 program offerings, the weekly reports help management to gauge response to program marketing. Reporting can be a data-driven management tool to help manage wellness programs. Reports provide rapid feedback regarding program performance. In contrast, in-depth program evaluations serve a different purpose, such as to report program-related savings, return on investment, or to report other longer term program-related outcomes.

  10. Planning for pre-exposure prophylaxis to prevent HIV transmission: challenges and opportunities

    Science.gov (United States)

    2010-01-01

    There are currently several ongoing or planned trials evaluating the efficacy of pre-exposure prophylaxis (PrEP) as a preventative approach to reducing the transmission of HIV. PrEP may prove ineffective, demonstrate partial efficacy, or show high efficacy and have the potential to reduce HIV infection in a significant way. However, in addition to the trial results, it is important that issues related to delivery, implementation and further research are also discussed. As a part of the ongoing discussion, in June 2009, the Bill & Melinda Gates Foundation sponsored a Planning for PrEP conference with stakeholders to review expected trial results, outline responsible educational approaches, and develop potential delivery and implementation strategies. The conference reinforced the need for continued and sustained dialogue to identify where PrEP implementation may fit best within an integrated HIV prevention package. This paper identifies the key action points that emerged from the Planning for PrEP meeting. PMID:20624303

  11. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  12. Efficacy of postal communication with patients who have cryopreserved pre-embryos.

    Science.gov (United States)

    Brzyski, R G

    1998-11-01

    To compare the characteristics of patients who did and did not respond to a request for information regarding their cryopreserved pre-embryos. Mail survey. Academic-assisted reproductive technology program. One hundred thirty-six patients with cryopreserved pre-embryos. Patients were surveyed by first-class mail regarding their plans for their cryopreserved pre-embryos and their interest in embryo donation. Age, number of stored pre-embryos, and duration of storage of responders and nonresponders at 6 weeks after mailing. Eighty-three patients (62%) did not respond to the survey. Compared with responders, nonresponders were significantly older at the time of embryo cryopreservation, had fewer pre-embryos cryopreserved, and had the pre-embryos cryopreserved for a longer duration. Five responders (9%) expressed an interest in embryo donation. Three patients requested disposal of pre-embryos. Sixteen surveys (12%) were returned as undeliverable. As a group, these patients had the fewest pre-embryos cryopreserved and had the longest duration of storage. A disturbing number of patients with cryopreserved pre-embryos ignored efforts by our program to maintain contact. Older patients with few cryopreserved pre-embryos may require special attention to avoid abandonment.

  13. The effectiveness of virtual simulation in improving student nurses' knowledge and performance during patient deterioration: A pre and post test design.

    Science.gov (United States)

    Borg Sapiano, Alexis; Sammut, Roberta; Trapani, Josef

    2018-03-01

    Preparing nursing students to perform competently in complex emergency situations, such as during rapid patient deterioration, is challenging. Students' active engagement in such scenarios cannot be ensured, due to the unexpected nature of such infrequent events. Many students may consequently not experience and integrate the management of patient deterioration into their knowledge and practical competency by the end of their studies, making them unprepared to manage such situations as practicing nurses. This study investigated the effectiveness of virtual simulation in improving performance during rapid patient deterioration. To investigate the effectiveness of virtual simulation in improving student nurses' knowledge and performance during rapid patient deterioration. A pre- and post-test design was used. Nursing students at a university in Malta were invited to participate in a virtual simulation program named FIRST 2 ACTWeb™, using their own computer devices. A total of 166 (response rate=50%) second and third year diploma and degree nursing students participated in the study. The simulation included three scenarios (Cardiac-Shock-Respiratory) portraying deteriorating patients. Performance feedback was provided at the end of each scenario. Students completed pre- and post-scenario knowledge tests and performance during each scenario was recorded automatically on a database. Findings showed a significant improvement in the students' post-scenario knowledge (z=-6.506, psimulation as an effective learning tool for pre-registration nursing students in different programs. Simulation improves both knowledge about and performance during patient deterioration. Virtual simulation of rare events should be a key component of undergraduate nurse education, to prepare students to manage complex situations as practicing nurses. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. Smart patient, smart community: improving client participation in family planning consultations through a community education and mass-media program in Indonesia.

    Science.gov (United States)

    Kim, Young Mi; Bazant, Eva; Storey, J Douglas

    In health care consultations, patients often receive insufficient information from providers and communicate little with providers about their needs or concerns. This study evaluated a combined community education and mass media intervention to improve clients' participation in family planning consultations. A household survey was conducted with 1,200 women in three sub-districts (two intervention and one control) of West Java province in Indonesia. A comparison of post-campaign findings among family planning clients suggests that the intervention as a whole had a positive effect on client participation, specifically the number of clients who prepared questions to ask the service provider prior to a family planning visit in the past year. Multivariate analyses showed that the "Smart Card" intervention and elements of the "Sahabat" (Friend) mass media campaign were positively associated with clients' preparation of questions and question asking behavior during family planning consultations, indicating that a combined community education and mass-media approach can improve client communication with providers and improve the quality of family planning counseling.

  15. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    Science.gov (United States)

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  16. A Seven-Step Business Plan Methodology To Develop and Manage Certificate Programs.

    Science.gov (United States)

    Cherif, Karim

    2000-01-01

    Outlines a process for writing a business plan for university certificate programs. The plan's sections include executive summary, rationale and objectives, prospective student profile, external involvement, program characteristics, marketing and promotion, and program administration. (SK)

  17. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  18. Evaluating a brief prevention program for improving marital conflict in community families.

    Science.gov (United States)

    Cummings, E Mark; Faircloth, W Brad; Mitchell, Patricia M; Cummings, Jennifer S; Schermerhorn, Alice C

    2008-04-01

    Marital conflict is related to well-being in children and adults (E. M. Cummings & P. T. Davies, 2002). Marital conflict is likely most effectively ameliorated before it becomes clinically significant. However, families without significant problems may be unwilling to participate in couples therapies or other lengthy or intensive interventions. Responding to this gap, the authors developed a 4-session psychoeducational program about marital conflict for community families. Couples with children 4-8 years of age were randomly blocked into 1 of 3 groups: (1) a parent-only group (n = 24), (2) a parent-child group (n = 33), or (3) a self-study group (n = 33). Pre- and posttest and 6-month and 1-year assessments were conducted. This report evaluates (a) whether participation in a psychoeducational program for parents improved marital conflict, especially concerning ways of expressing disagreements, and (b) whether changes in marital conflict subsequently improved marital satisfaction, parenting, and child adjustment. Greater constructive and less destructive marital conflict was observed at all assessments for treatment groups, and these changes were linked with improvements in other family processes. The findings support the promise of brief, psychoeducational programs for improving marital conflict for community samples. (c) 2008 APA, all rights reserved.

  19. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-01-01

    This paper presents the status of technology program planning to achieve readiness of Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies of significant maturity: ion electric propulsion and the SP-100 space nulcear power technologies. Detailed plans are presented herein for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  20. Risk communications and the Chemical Stockpile Emergency-Planning Program

    Energy Technology Data Exchange (ETDEWEB)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  1. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  2. The Situation Analysis Study of the family planning program in Kenya.

    Science.gov (United States)

    Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A

    1991-01-01

    A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.

  3. Program plan, and request for reprogramming first year funds. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  4. Lesson Study-Building Communities of Learning Among Pre-Service Science Teachers

    Science.gov (United States)

    Hamzeh, Fouada

    Lesson Study is a widely used pedagogical approach that has been used for decades in its country of origin, Japan. It is a teacher-led form of professional development that involves the collaborative efforts of teachers in co-planning and observing the teaching of a lesson within a unit for evidence that the teaching practices used help the learning process (Lewis, 2002a). The purpose of this research was to investigate if Lesson Study enables pre-service teachers to improve their own teaching in the area of science inquiry-based approaches. Also explored are the self-efficacy beliefs of one group of science pre-service teachers related to their experiences in Lesson Study. The research investigated four questions: 1) Does Lesson Study influence teacher preparation for inquiry-based instruction? 2) Does Lesson Study improve teacher efficacy? 3) Does Lesson Study impact teachers' aspiration to collaborate with colleagues? 4) What are the attitudes and perceptions of pre-service teachers to the Lesson Study idea in Science? The 12 participants completed two pre- and post-study surveys: STEBI- B, Science Teaching Efficacy Belief Instrument (Enochs & Riggs, 1990) and ASTQ, Attitude towards Science Teaching. Data sources included student teaching lesson observations, lesson debriefing notes and focus group interviews. Results from the STEBI-B show that all participants measured an increase in efficacy throughout the study. This study added to the body of research on teaching learning communities, professional development programs and teacher empowerment.

  5. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  6. A Fuzzy Linear Programming Approach for Aggregate Production Planning

    DEFF Research Database (Denmark)

    Iris, Cagatay; Cevikcan, Emre

    2014-01-01

    a mathematical programming framework for aggregate production planning problem under imprecise data environment. After providing background information about APP problem, together with fuzzy linear programming, the fuzzy linear programming model of APP is solved on an illustrative example for different a...

  7. Improving Latino disaster preparedness using social networks.

    Science.gov (United States)

    Eisenman, David P; Glik, Deborah; Gonzalez, Lupe; Maranon, Richard; Zhou, Qiong; Tseng, Chi-Hong; Asch, Steven M

    2009-12-01

    Culturally targeted, informal social networking approaches to improving disaster preparedness have not been empirically tested. In partnership with community health promoters and the Los Angeles County Department of Public Health, this study tested a disaster preparedness program for Latino households. This study had a community-based, randomized, longitudinal cohort design with two groups and was conducted during February-October 2007. Assessments were made at baseline and 3 months. Analyses were carried out January-October 2008. Community-based study of 231 Latinos living in Los Angeles County. Participants were randomly assigned to attending platicas (small-group discussions led by a health promoter/promotora de salud) or receiving "media" (a culturally tailored mailer). A total of 187 (81.0%) completed the 3-month follow-up. A self-reported disaster preparedness checklist was used. Among participants who did not have emergency water pre-intervention, 93.3% of those in the platica arm had it at follow-up, compared to 66.7% in the media arm (p=0.003). Among participants who did not have food pre-intervention, 91.7% in the platica arm reported it at follow-up, compared to 60.6% in the media arm (p=0.013). Finally, among participants who did not have a family communication plan pre-intervention, 70.4% in the platica arm reported one at follow-up, compared to 42.3% in the media arm (p=0.002). Although both arms improved in stockpiling water and food and creating a communication plan, the platica arm showed greater improvement than the media group.

  8. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  9. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    International Nuclear Information System (INIS)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required

  10. Pre-Service and In-Service Teachers' Experiences of Learning to Program in an Object-Oriented Language

    Science.gov (United States)

    Govender, I.; Grayson, D. J.

    2008-01-01

    This paper presents the results of an investigation into the various ways in which pre-service and in-service teachers experience learning to program in an object-oriented language. Both groups of teachers were enrolled in university courses. In most cases, the pre-service teachers were learning to program for the first time, while the in-service…

  11. ‘Only Systems Thinking Can Improve Family Planning Program in Pakistan’: A Descriptive Qualitative Study

    Directory of Open Access Journals (Sweden)

    Saira Zafar

    2014-12-01

    Full Text Available Background Family Planning (FP program in Pakistan has been struggling to achieve the desired indicators. Despite a well-timed initiation of the program in late 50s, fertility decline has been sparingly slow. As a result, rapid population growth is impeding economic development in the country. A high population growth rate, the current fertility rate, a stagnant contraceptive prevalence rate and high unmet need remain challenging targets for population policies and FP programs. To accelerate the pace of FP programs and targets concerned, it is imperative to develop and adopt a holistic approach and strategy for plugging the gaps in various components of the health system: service delivery, information systems, drugs-supplies, technology and logistics, Human Resources (HRs, financing, and governance. Hence, World Health Organization (WHO health systems building blocks present a practical framework for overall health system strengthening. Methods This descriptive qualitative study, through 23 in-depth interviews, explored the factors related to the health system, and those responsible for a disappointing FP program in Pakistan. Provincial representatives from Population Welfare and Health departments, donor agencies and non-governmental organizations involved with FP programs were included in the study to document the perspective of all stakeholders. Content analysis was done manually to generate nodes, sub-nodes and themes. Results Performance of FP programs is not satisfactory as shown by the indicators, and these programs have not been able to deliver the desired outcomes. Interviewees agreed that inadequate prioritization given to the FP program by successive governments has led to this situation. There are issues with all health system areas, including governance, strategies, funding, financial management, service delivery systems, HRs, technology and logistic systems, and Management Information System (MIS; these have encumbered the pace of

  12. Fontan Surgical Planning: Previous Accomplishments, Current Challenges, and Future Directions.

    Science.gov (United States)

    Trusty, Phillip M; Slesnick, Timothy C; Wei, Zhenglun Alan; Rossignac, Jarek; Kanter, Kirk R; Fogel, Mark A; Yoganathan, Ajit P

    2018-04-01

    The ultimate goal of Fontan surgical planning is to provide additional insights into the clinical decision-making process. In its current state, surgical planning offers an accurate hemodynamic assessment of the pre-operative condition, provides anatomical constraints for potential surgical options, and produces decent post-operative predictions if boundary conditions are similar enough between the pre-operative and post-operative states. Moving forward, validation with post-operative data is a necessary step in order to assess the accuracy of surgical planning and determine which methodological improvements are needed. Future efforts to automate the surgical planning process will reduce the individual expertise needed and encourage use in the clinic by clinicians. As post-operative physiologic predictions improve, Fontan surgical planning will become an more effective tool to accurately model patient-specific hemodynamics.

  13. The Development of Interdisciplinary Teaching Approaches among Pre-service Science and Mathematics Teachers

    Science.gov (United States)

    Miranda Martins, Dominique

    This study sought to understand how a group of pre-service teachers in a combined secondary science and mathematics teaching methods course conceptualized and experienced interdisciplinary approaches to teaching. Although knowing how to plan interdisciplinary activities is an essential teaching practice in Quebec, these pre-service teachers faced many challenges during the process of learning to teach with this approach. By using two interdisciplinary frameworks (Nikitina, 2005; Boix Mansilla & Duraising, 2007), I qualitatively analyzed the development of the pre-service teachers' prior and emerging ideas about interdisciplinarity and their ability to plan interdisciplinary teaching activities. The provincial curriculum and issues related to time greatly shaped students' conceptions about interdisciplinarity in the classroom and constrained their ability to plan for and envision the enactment of interdisciplinary lessons in secondary science and mathematics classes. In addition, images of themselves as content-specialists, self-efficacy beliefs in relation to interdisciplinary teaching, and student learning as a source of teacher motivation emerged as key factors promoting or interrupting the development of interdisciplinary teaching approaches. Examination of these factors highlights the need for teacher-education programs to provide opportunities for pre-service teachers to explore how they see themselves as educators, increase their instructional self-efficacy beliefs, and motivate them to teach in an interdisciplinary fashion. Keywords: interdisciplinary teaching, student-teachers, curriculum, teacher-education program, self-efficacy, motivation.

  14. Programming of Urban Revitalization

    Science.gov (United States)

    Biliński, Tadeusz

    2016-12-01

    The planning stage of the investment-construction process is of a crucial importance. Its overall impact on the costs, construction time and the quality of design solutions is huge. However, in practice, little attention is given to this pre-design stage, except for public buildings or other buildings of particular importance. In consequence, the results of investment and construction activities are unsatisfactory. Therefore, the issue has been given careful consideration in this paper. The paper discusses the issue of programming urban revitalization, emphasizing its socio-economic importance. To illustrate the complexity of revitalization projects planning, the author draws attention to social, economic, technical and organisational factors, such as public participation, reorganization and revaluation of land use planning, rationalization of energy use, organization and management of revitalization processes, as well as technical progress. Summarising the paper, the author concludes that in order to improve the quality of life of town residents and to protect material national heritage, it is indispensable to continuously revitalize subsequent town areas.

  15. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  16. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  17. Planning and programming of pre-operational and in-service inspections

    International Nuclear Information System (INIS)

    Udaondo, M.S.

    1984-01-01

    After a brief mention of the actual scope of in-service inspection work, conclusions are presented that relate to the preparations for inspections, making use of experience acquired since 1972 at 11 nuclear power plants in Spain which have commissioned such studies from one particular organization, and analyses are given of the advantages to be gained therefrom. Three different aspects of preparations for inspections are considered: (a) man-hour estimates and the duration of in-service inspections; (b) the sequence of action during a pre-operational inspection (assuming a typical functional organization) from definition of the codes of practice and standards applicable up to the issue of the final report and the schedule for distribution of the annual work load to be invested in a typical project, as a result of combining the two previous estimates, and (c) the documentary aspect of preparations for an inspection during a scheduled outage, as related to the various documents to be drawn up and their contents. Reference is made to the general training to be given to the staff in charge of inspection activities so as to provide them with information on, and a perspective of, the in-service inspection jobs required. (author)

  18. Are men well served by family planning programs?

    Science.gov (United States)

    Hardee, Karen; Croce-Galis, Melanie; Gay, Jill

    2017-01-23

    Although the range of contraceptives includes methods for men, namely condoms, vasectomy and withdrawal that men use directly, and the Standard Days Method (SDM) that requires their participation, family planning programming has primarily focused on women. What is known about reaching men as contraceptive users? This paper draws from a review of 47 interventions that reached men and proposes 10 key considerations for strengthening programming for men as contraceptive users. A review of programming shows that men and boys are not particularly well served by programs. Most programs operate from the perspective that women are contraceptive users and that men should support their partners, with insufficient attention to reaching men as contraceptive users in their own right. The notion that family planning is women's business only is outdated. There is sufficient evidence demonstrating men's desire for information and services, as well as men's positive response to existing programming to warrant further programming for men as FP users. The key considerations focus on getting information and services where men and boys need it; addressing gender norms that affect men's attitudes and use while respecting women's autonomy; reaching adolescent boys; including men as users in policies and guidelines; scaling up successful programming; filling gaps with implementation research and monitoring & evaluation; and creating more contraceptive options for men.

  19. Improvement of the financial planning on a railway transport

    OpenAIRE

    Bogomolova, N.; Kravchenko, O.

    2011-01-01

    In the article are considered approaches to the determination of financial planning, are chose defects of ukrainian financial planning system, is conducted analysis of financial planning and budgeting, are offered directions to improvement of financial planning in railroad transport.

  20. It Takes a Toll on Pre-Service Teachers and Programs: Case Studies of Teacher Candidates Who Withdrew from a Teacher Education Program

    Science.gov (United States)

    Lin, Pei-Ying; Childs, Ruth A.; Zhang, Jingshun

    2016-01-01

    Previous studies have examined patterns of withdrawal from initial teacher education (ITE) programs and have found that pre-service teachers are more likely to withdraw if they are male or older than the typical pre-service teacher. This study presents case studies based on semi-structured interviews with older male pre-service teachers who…

  1. SU-F-T-44: A Comparison of the Pre-Plan, Intra-Operative Plan, and Post-Implant Dosimetry for a Prostate Implant Case Using Prefabricated Linear Polymer-Encapsulated Pd-103

    International Nuclear Information System (INIS)

    Sheu, R; Powers, A; McGee, H; Stock, R; Lo, Y

    2016-01-01

    Purpose: To investigate the reproducibility and limitations of Pd-103 prostate brachytherapy using fixed length linear sources (CivaString). Methods: An LDR prostate brachytherapy case which was preplanned on MR images with prefabricated linear polymer-encapsulated Pd-103 sources (CivaString) was studied and compared with ultrasound based intra-operative planning and CT based post-implant dosimetry. We evaluated the following parameters among the three studies: prostate geometry (volume and cross sectional area), needle position and alignment deviations, and dosimetry parameters (D90). Results: The prostate volumes and axial cross sectional areas at center of prostate were measured as 41.8, 39.3 and 36.8 cc, and 14.9, 14.3, and 11.3 respectively on pre-plan MR, inter-op US, and post-implant CT studies. The deviation of prostate volumes and axial cross sectional areas measured on pre-planning MR and intra-operative US were within 5%. 17 out of 19 pre-planned needles were positioned within 5mm (the template grid size). One needle location was adjusted intra-operatively and another needle was removed due to proximity to urethra. The needle pathways were not always parallel to the trans-rectal probe due to the flexibility of CivaString. The angle of deviation was up to 10 degrees. Two pairs of needles were exchanged to better fit the length of prostate at the time of implant. This resulted in a prostate D90 of 153.8 Gy (124%) and 131.4 Gy (106.7%) for intra-op and PID respectively. Conclusion: Preplanning is a necessary part of implants performed with prefabricated linear polymer sources. However, as is often the case, there were real-time deviations from the pre-plan. Intra-op planning provides the ability conform to anatomy at the time of implant. Therefore, we propose to develop a systematic way to order extra strings of different length to provide the flexibility to perform intra-operative planning with fixed length strands.

  2. SU-F-T-44: A Comparison of the Pre-Plan, Intra-Operative Plan, and Post-Implant Dosimetry for a Prostate Implant Case Using Prefabricated Linear Polymer-Encapsulated Pd-103

    Energy Technology Data Exchange (ETDEWEB)

    Sheu, R; Powers, A; McGee, H; Stock, R; Lo, Y [Mount Sinai Medical Center, New York, NY (United States)

    2016-06-15

    Purpose: To investigate the reproducibility and limitations of Pd-103 prostate brachytherapy using fixed length linear sources (CivaString). Methods: An LDR prostate brachytherapy case which was preplanned on MR images with prefabricated linear polymer-encapsulated Pd-103 sources (CivaString) was studied and compared with ultrasound based intra-operative planning and CT based post-implant dosimetry. We evaluated the following parameters among the three studies: prostate geometry (volume and cross sectional area), needle position and alignment deviations, and dosimetry parameters (D90). Results: The prostate volumes and axial cross sectional areas at center of prostate were measured as 41.8, 39.3 and 36.8 cc, and 14.9, 14.3, and 11.3 respectively on pre-plan MR, inter-op US, and post-implant CT studies. The deviation of prostate volumes and axial cross sectional areas measured on pre-planning MR and intra-operative US were within 5%. 17 out of 19 pre-planned needles were positioned within 5mm (the template grid size). One needle location was adjusted intra-operatively and another needle was removed due to proximity to urethra. The needle pathways were not always parallel to the trans-rectal probe due to the flexibility of CivaString. The angle of deviation was up to 10 degrees. Two pairs of needles were exchanged to better fit the length of prostate at the time of implant. This resulted in a prostate D90 of 153.8 Gy (124%) and 131.4 Gy (106.7%) for intra-op and PID respectively. Conclusion: Preplanning is a necessary part of implants performed with prefabricated linear polymer sources. However, as is often the case, there were real-time deviations from the pre-plan. Intra-op planning provides the ability conform to anatomy at the time of implant. Therefore, we propose to develop a systematic way to order extra strings of different length to provide the flexibility to perform intra-operative planning with fixed length strands.

  3. 78 FR 7476 - Airport Improvement Program

    Science.gov (United States)

    2013-02-01

    ... Airports, Airport Planning and Programming, Routing Symbol APP-501, 800 Independence Avenue SW., Room 619... Programming, Routing Symbol APP-501, 800 Independence Avenue SW., Room 619, Washington, DC 20591; between 9 a... recognition of the interest of all segments of the airport community in the AIP. The agency will consider all...

  4. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    Science.gov (United States)

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  5. 76 FR 1592 - National Poultry Improvement Plan; General Conference Committee Meeting

    Science.gov (United States)

    2011-01-11

    ...] National Poultry Improvement Plan; General Conference Committee Meeting AGENCY: Animal and Plant Health... General Conference Committee of the National Poultry Improvement Plan. DATES: The General Conference... Improvement Plan, VS, APHIS, 1498 Klondike Road, Suite 101, Conyers, GA 30094-5104; (770) 922-3496...

  6. Development and evaluation of an educational intervention program for pre-professional adolescent ballet dancers: nutrition for optimal performance.

    Science.gov (United States)

    Doyle-Lucas, Ashley F; Davy, Brenda M

    2011-06-01

    The purpose of this investigation was to develop, implement, and evaluate a theoretically based nutritional education intervention through a DVD lecture series (three 30-minute classes) in summer intensive programs for pre-professional, adolescent ballet dancers. Objectives of this intervention program were to increase knowledge of basic sports nutrition principles and the Female Athlete Triad and promote self-efficacy for adopting healthier dietary habits. Dancers ranging from 13 to 18 years old who were attending summer intensive programs affiliated with professional ballet companies were recruited. Group One (n = 231) participated in the nutrition education program, while Group Two the control participants (n = 90) did not. Assessments of the participants' dietary status consisted of a demographic questionnaire, a Sports Nutrition Knowledge and Behavior Questionnaire, and a Food Frequency Questionnaire. The intervention group was assessed at baseline, immediately post-program, and at six weeks post-program. The control group was assessed at baseline and at six weeks post-baseline. The intervention program was effective at increasing nutrition knowledge, perceived susceptibility to the Female Athlete Triad, and self-efficacy constructs. Improvements in dietary intake were also observed among intervention group participants. To improve overall health and performance nutrition education should be incorporated into the training regimens of adolescent dancers. This potentially replicable DVD-based program may be an effective, low-cost mechanism for doing that.

  7. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  8. Patient-specific positioning guides for total knee arthroplasty: no significant difference between final component alignment and pre-operative digital plan except for tibial rotation.

    Science.gov (United States)

    Boonen, Bert; Schotanus, Martijn G M; Kerens, Bart; Hulsmans, Frans-Jan; Tuinebreijer, Wim E; Kort, Nanne P

    2017-09-01

    To assess whether there is a significant difference between the alignment of the individual femoral and tibial components (in the frontal, sagittal and horizontal planes) as calculated pre-operatively (digital plan) and the actually achieved alignment in vivo obtained with the use of patient-specific positioning guides (PSPGs) for TKA. It was hypothesised that there would be no difference between post-op implant position and pre-op digital plan. Twenty-six patients were included in this non-inferiority trial. Software permitted matching of the pre-operative MRI scan (and therefore calculated prosthesis position) to a pre-operative CT scan and then to a post-operative full-leg CT scan to determine deviations from pre-op planning in all three anatomical planes. For the femoral component, mean absolute deviations from planning were 1.8° (SD 1.3), 2.5° (SD 1.6) and 1.6° (SD 1.4) in the frontal, sagittal and transverse planes, respectively. For the tibial component, mean absolute deviations from planning were 1.7° (SD 1.2), 1.7° (SD 1.5) and 3.2° (SD 3.6) in the frontal, sagittal and transverse planes, respectively. Absolute mean deviation from planned mechanical axis was 1.9°. The a priori specified null hypothesis for equivalence testing: the difference from planning is >3 or plan in all planes, except for the tibial rotation in the transverse plane. Possible explanations for outliers are discussed and highlight the importance for adequate training surgeons before they start using PSPG in their day-by-day practise. Prospective cohort study, Level II.

  9. Alberta: evaluation of nursing retention and recruitment programs.

    Science.gov (United States)

    Weidner, Arlene; Graham, Carol; Smith, Jennifer; Aitken, Julia; Odell, Jill

    2012-03-01

    Retention and recruitment strategies are essential to address nursing workforce supply and ensure the viability of healthcare delivery in Canada. Knowledge transfer between experienced nurses and those new to the profession is also a focus for concern. The Multi-Employer/United Nurses of Alberta Joint Committee attempted to address these issues by introducing a number of retention and recruitment (R&R) initiatives for nurses in Alberta: in total, seven different programs that were introduced to some 24,000 nurses and employers across the province of Alberta in 2001 (the Transitional Graduate Nurse Recruitment Program) and 2007 (the remaining six R&R programs). Approximately 1,600 nurses participated in the seven programs between 2001 and 2009. Of the seven strategies, one supported entry into the workplace, two were pre-retirement strategies and four involved flexible work options. This project entailed a retrospective evaluation of the seven programs and differed from the other Research to Action (RTA) projects because it was solely concerned with evaluation of pre-existing initiatives. All seven programs were launched without a formal evaluation component, and the tracking of local uptake varied throughout the province. The union and various employers faced challenges in implementing these strategies in a timely fashion, as most were designed at the bargaining table during negotiations. As a result, systems, policy and procedural changes had to be developed to support their implementation after they became available.Participants in the programs indicated improvements over time in several areas, including higher levels of satisfaction with work–life balance, hours worked and their current practice and profession. The evaluation found that participation led to perceived improvements in nurses' confidence, greater control over their work environment, decreased stress levels, increased energy and morale and perceived improved ability to provide high-quality care

  10. The Managers’ Experiential Learning of Program Planning in Active Ageing Learning Centers

    Directory of Open Access Journals (Sweden)

    Chun-Ting Yeh

    2016-12-01

    Full Text Available Planning older adult learning programs is really a complex work. Program planners go through different learning stages and accumulate experiences to be able to undertake the task alone. This study aimed to explore the experiential learning process of older adult learning program planners who work in the Active Ageing Learning Centers (AALCs. Semi-structure interviews were conducted with seven program planners. The findings of this study were identified as follows. 1 Before being a program planner, the participants’ knowledge results from grasping and transforming experience gained from their family, their daily lives and past learning experiences; 2 after being a program planner, the participants’ experiential learning focused on leadership, training in the institute, professional development, as well as involvement in organizations for elderly people; and 3 the participants’ experiential learning outcomes in the older adult learning program planning include: their ability to reflect on the appropriateness and fulfillment of program planning, to apply theoretical knowledge and professional background in the field, and to make plans for future learning and business strategies.

  11. SU-F-T-225: Is It Time to Have Pre-Configured Therapeutic Beams Available in Commercial Treatment Planning Systems?

    International Nuclear Information System (INIS)

    Ding, G

    2016-01-01

    Purpose: Commissioning radiation beams requires considerable effort to obtain the beam data for beam configuration in a commercial treatment planning system. With the advances in technology, the manufacturer of accelerators now has the ability to adjust radiation beam parameters to meet pre-determined specifications with high precision. This study aims to illustrate the feasibility of making pre-configured radiation beams available in commercial treatment planning systems. Methods: In recent years, Varian has made a set of measured beam data from the TrueBeam accelerator available to users. Although the beam data are provided as “suggestive data” without warranty, the commissioned data measured by users have been shown to be in excellent agreement with the data set provided when the beams from the installed Linacs were adjusted to meet the beam specifications. An unofficial survey among Varian Linac TrueBeam users shows that the suggestive data set has been used with validation by users in some clinics. This indicates that radiation beams from a specified Linac can be standardized and pre-configured in a treatment planning system. Results: Two newly installed Varian TrueBeam accelerators at two different centers were examined in which one set of commissioned beam data was obtained from measurements performed by an independent physics consulting company and the other was measured by local physicists in the department. All beams from both accelerators were tuned to meet the manufacturer’s specifications. Discrepancies of less than 1% were found between the commissioned beam data from both accelerators and the suggestive data set provided by Varian. Conclusion: It may be feasible that radiation beams can be pre-configured in commercial treatment planning systems. The radiation beam users will perform the beam validation and end-to-end tests instead of configuring beams. This framework can increase both the efficiency and the accuracy in commercial radiation

  12. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program plan: Executive summary

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan provides a strategy for management of hazardous and mixed wastes generated by the five Department of Energy (DOE) installations managed by Martin Marietta Energy Systems, Inc. (Energy Systems). This integrated corporate plan is based on the individual installation plans, which identify waste streams, facility capabilities, problem wastes, future needs, and funding needs. Using this information, the corporate plan identifies common concerns and technology/facility needs over the next 10 years. The overall objective of this corporate plan is to ensure that treatment, storage, and disposal (TSD) needs for all hazardous and mixed wastes generated by Energy Systems installations have been identified and planned for. Specific objectives of the program plan are to (1) identify all hazardous and mixed waste streams; (2) identify hazardous and mixed waste TSD requirements; (3) identify any unresolved technical issues preventing implementation of the strategy; (4) develop schedules for studies, demonstrations, and facilities to resolve the issues; and (5) define the interfaces with the Low-Level Waste Disposal Development and Demonstration (LLWDDD) Program. 10 refs., 7 figs

  13. Improvement of quantum efficiency in green light-emitting diodes with pre-TMIn flow treatment

    International Nuclear Information System (INIS)

    Lee, Ya-Ju; Chen, Yi-Ching; Lu, Tien-Chang

    2011-01-01

    The effects of pre-trimethlyindium (TMIn) flow on the improved electrical characteristics and highly stable temperature properties of InGaN green light-emitting diodes (LEDs) are discussed. For the LED sample with a pre-TMIn flow treatment, the tunnelling of injected carriers associated with threading defects is significantly reduced, which promotes the diffusion-recombination of injected carriers, as well as the overall emission efficiency of the LED. In addition, the pre-TMIn flow treatment evidently reduces the dependence of external quantum efficiency on temperature and efficiency droop of green LEDs. As a result, we conclude that the pre-TMIn flow treatment is a promising scheme for the improvement of output performance of InGaN-based green LEDs.

  14. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  15. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  16. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  17. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  18. Business process modeling for the Virginia Department of Transportation : a demonstration with the integrated six-year improvement program and the statewide transportation improvement program.

    Science.gov (United States)

    2005-01-01

    This effort demonstrates business process modeling to describe the integration of particular planning and programming activities of a state highway agency. The motivations to document planning and programming activities are that: (i) resources for co...

  19. The Planning and Scheduling of HST: Improvements and Enhancements since Launch

    Science.gov (United States)

    Taylor, D. K.; Chance, D. R.; Jordan, I. J. E.; Patterson, A. P.; Stanley, M.; Taylor, D. C.

    2001-12-01

    The planning and scheduling (P&S) systems used in operating the Hubble Space Telescope (HST) have undergone such substantial and pervasive re-engineering that today they dimly resemble those used when HST was launched. Processes (i.e., software, procedures, networking, etc.) which allow program implementation, the generation of a Long Range Plan (LRP), and the scheduling of science and mission activities have improved drastically in nearly 12 years, resulting in a consistently high observing efficiency, a stable LRP that principal investigators can use, exceptionally clean command loads uplinked to the spacecraft, and the capability of a very fast response time due to onboard anomalies or targets of opportunity. In this presentation we describe many of the systems which comprise the P&S ("front-end") system for HST, how and why they were improved, and what benefits have been realized by either the HST user community or the STScI staff. The systems include the Guide Star System, the Remote Proposal Submission System - 2 (RPS2), Artificial Intelligence (AI) planning tools such as Spike, and the science and mission scheduling software. We also describe how using modern software languages such as Python and better development practices allow STScI staff to do more with HST (e.g., to handle much more science data when ACS is installed) without increasing the cost to HST operations.

  20. Theta burst magnetic stimulation over the pre-supplementary motor area improves motor inhibition.

    Science.gov (United States)

    Obeso, Ignacio; Wilkinson, Leonora; Teo, James T; Talelli, Penelope; Rothwell, John C; Jahanshahi, Marjan

    Stopping an ongoing motor response or resolving conflict induced by conflicting stimuli are associated with activation of a right-lateralized network of inferior frontal gyrus (IFG), pre-supplementary motor area (pre-SMA) and subthalamic nucleus (STN). However, the roles of the right IFG and pre-SMA in stopping a movement and in conflict resolution remain unclear. We used continuous theta burst stimulation (cTBS) to examine the involvement of the right IFG and pre-SMA in inhibition and conflict resolution using the conditional stop signal task. We measured stop signal reaction time (SSRT, measure of reactive inhibition), response delay effect (RDE, measure of proactive action restraint) and conflict induced slowing (CIS, measure of conflict resolution). Stimulation over the pre-SMA resulted in significantly shorter SSRTs (improved inhibition) compared to sham cTBS. This effect was not observed for CIS, RDE, or any other measures. cTBS over the right IFG had no effect on SSRT, CIS, RDE or on any other measure. The improvement of SSRT with cTBS over the pre-SMA suggests its critical contribution to stopping ongoing movements. Copyright © 2017 Elsevier Inc. All rights reserved.