WorldWideScience

Sample records for power project nears

  1. Elk and plants thrive near power lines

    Energy Technology Data Exchange (ETDEWEB)

    Lustre, L.

    1997-11-01

    Butterflies and elk gather in clearings near power line right-of-ways and on the edges of such clearings, where the wild flowers and plants that have widely disappeared as a result of intensive farming and subsurface drainage of fields have found a good habitat. Ornamental coniferous trees, various herbs and assorted berries do well and can be harvested near power lines from woodland clearings once thought unfit for cultivation. IVS, the nationwide network company, takes part in many projects aiming both to increase productive utilization of land areas under power lines and to promote biodiversity

  2. Pinon Pine power project nears start-up

    Energy Technology Data Exchange (ETDEWEB)

    Tatar, G.A. [Sierra Pacific Power Co., Reno, NV (United States); Gonzalez, M. [Foster Wheeler USA Corp., Clinton, NJ (United States); Mathur, G.K. [M.W. Kellogg Co., Houston, TX (United States)

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing of the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.

  3. AAEC nuclear power projections

    International Nuclear Information System (INIS)

    Khoe, G.; Fredsall, J.; Scurr, I.; Plotnikoff, W.

    1981-01-01

    The nuclear power capacity projections developed in the May-June period of 1981 by the AAEC are presented. There have been downward revisions for nearly all countries with centrally planned economies. Projections for the year 2000 for the Western World have decreased in aggregate by 4.7% (27Gw) compared to those of 1980. However, this reduction is less than the previous estimate reduction and there appears to have been a stabilisation in the projection

  4. Near-Term Nuclear Power Revival? A U.S. and International Perspective

    International Nuclear Information System (INIS)

    Braun, C.

    2004-01-01

    In this paper I review the causes for the renewed interest in the near-term revival of nuclear power in the U.S. and internationally. I comment on the progress already made in the U.S. in restarting a second era of commercial nuclear power plant construction, and on what is required going forwards, from a utilities perspective, to commit to and implement new plant orders. I review the specific nuclear projects discussed and committed to in the U.S. and abroad in terms of utilities, sites, vendor and suppliers teams, and project arrangements. I will then offer some tentative conclusions regarding the prospects for a near-term U.S. and global nuclear power revival

  5. Atomic power project, Kakrapar, Gujarat

    International Nuclear Information System (INIS)

    Varadarajan, G.

    1992-01-01

    The atomic power project at Kakrapar, comprising of two units of 235 MW each, went critical very recently in September 1992. The work consisted of construction of reactor and turbine buildings, outer and inner containment walls, calandria vault, natural draught cooling tower, etc. Nearly 152,000m 3 of normal aggregate concrete and 3,500m 3 of heavy aggregate concrete were produced and poured. The paper describes salient innovative construction features of the project. Incidentally, the project received a Certificate of Merit in the Excellence in Concrete competition held by the Maharashtra India Chapter of the American Concrete Institute. (author). 7 figs

  6. UCH-II, private power project, Dera Murad Jamali, Pakistan. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Energy Resources International and Power Development Company of Pakistan in association with General Electric Corporation, Inc. offers to build, finance, own and operate a 500+ MW combined cycle natural gas electric power plant, near Dera Murad Jamali, Pakistan. The basis for the undertaking is a carefully balanced and integrated series of contracts for fuel, power purchase, and implementation of the proposed project. The contracts would be established between the Government of Pakistan (GOP), its agencies and instrumentalities, Energy Resources International with Power Development Company and its associates, and a Project Company organized specifically for the undertaking. The report describes the project.

  7. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  8. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  9. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  10. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  11. Electric power from near-term fusion reactors

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Deis, G.A.; Miller, L.G.

    1981-01-01

    This paper examines requirements and possbilities of electric power production on near-term fusion reactors using low temperature cycle technology similar to that used in some geothermal power systems. Requirements include the need for a working fluid with suitable thermodynamics properties and which is free of oxygen and hydrogen to facilitate tritium management. Thermal storage will also be required due to the short system thermal time constants on near-time reactors. It is possbile to use the FED shield in a binary power cycle, and results are presented of thermodynamic analyses of this system

  12. Discussions and projections about the future demand for nuclear power in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Fabio Branco Vaz de, E-mail: fabio@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Nuclear and Engineering Center; Imakuma, Kengo, E-mail: kimakuma@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Information Technology Development Dept.

    2011-07-01

    This paper aims mainly to discuss the current scenarios of power consumption, nuclear power and conventional and uranium resources and, based on that, present projections about the future demand for power generated through atomic fissions in Brazil, showing that there may be differences in estimates of future projections, depending on the indexes considered: global or domestic. The time horizon for the analysis was studied up to the maximum for the national population, for some of the world and Brazil's governmental data in terms of population growth, energy consumption and energy consumption per capita. To introduce the importance of the methodology adopted, data and some problems presented about the current world energy and Brazilian scenarios are discussed. Calculations show that the power consumption projections for Brazil, when using global indexes, are very high. According to our methodology, power consumption in Brazil is nearly 4.5 times below the estimates presented by the global indexes. The conclusion is that applying global indexes and their extension to domestic scenarios lead to errors of orders of magnitudes, due to the specific particularities of each country, and must be avoided if accurate projections about energy and nuclear scenarios must be considered. (author)

  13. Discussions and projections about the future demand for nuclear power in Brazil

    International Nuclear Information System (INIS)

    Oliveira, Fabio Branco Vaz de; Imakuma, Kengo

    2011-01-01

    This paper aims mainly to discuss the current scenarios of power consumption, nuclear power and conventional and uranium resources and, based on that, present projections about the future demand for power generated through atomic fissions in Brazil, showing that there may be differences in estimates of future projections, depending on the indexes considered: global or domestic. The time horizon for the analysis was studied up to the maximum for the national population, for some of the world and Brazil's governmental data in terms of population growth, energy consumption and energy consumption per capita. To introduce the importance of the methodology adopted, data and some problems presented about the current world energy and Brazilian scenarios are discussed. Calculations show that the power consumption projections for Brazil, when using global indexes, are very high. According to our methodology, power consumption in Brazil is nearly 4.5 times below the estimates presented by the global indexes. The conclusion is that applying global indexes and their extension to domestic scenarios lead to errors of orders of magnitudes, due to the specific particularities of each country, and must be avoided if accurate projections about energy and nuclear scenarios must be considered. (author)

  14. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  15. Near-Site Transportation Infrastructure Project

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities

  16. Recent experiences with independent power projects

    International Nuclear Information System (INIS)

    Kline, R.H.; Fitzowitch, J.R.; Dalla-Longa, L.

    1999-01-01

    New opportunities are making it possible to develop independent power projects involving partnerships with the electric power industry, and the petroleum and natural gas industry . This paper described those opportunities, the impediments and the risks involved. Mercury Electric Corp. has been involved in power projects at remote gas field and oil field sites where they use of a turbogenerator which runs on flare gas to generate electricity. TransCanada Power's involvement in independent power projects includes the supply and transport of gas and their ability to provide gas fired combined cycle technology. They are involved in a project at Hermiston, Oregon and also in a cogeneration project in Medicine Hat, Alberta. The CanCarb City of Medicine Hat project makes use of waste heat at an industrial facility. 11 figs

  17. Photovoltaic System Pricing Trends. Historical, Recent, and Near-Term Projections, 2015 Edition

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chung, Donald [National Renewable Energy Lab. (NREL), Golden, CO (United States); Fu, Ran [National Renewable Energy Lab. (NREL), Golden, CO (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Davidson, Carolyn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Darghouth, Naïm [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-08-25

    This presentation, based on research at Lawrence Berkeley National Laboratory and the National Renewable Energy Laboratory, provides a high-level overview of historical, recent, and projected near-term PV pricing trends in the United States focusing on the installed price of PV systems. It also attempts to provide clarity surrounding the wide variety of potentially conflicting data available about PV system prices. This PowerPoint is the fourth edition from this series.

  18. Development of low head Kaplan turbine for power station rehabilitation project

    Science.gov (United States)

    Lim, S. M.; Ohtake, N.; Kurosawa, S.; Suzuki, T.; Yamasaki, T.; Nishi, H.

    2012-11-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  19. Development of low head Kaplan turbine for power station rehabilitation project

    International Nuclear Information System (INIS)

    Lim, S M; Ohtake, N; Kurosawa, S; Suzuki, T; Yamasaki, T; Nishi, H

    2012-01-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  20. High power RF systems for the BNL ERL project

    Energy Technology Data Exchange (ETDEWEB)

    Zaltsman, A.; Lambiase, R.

    2011-03-28

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  1. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  2. The magnetic field near power lines in the Moscow region: the results of measurements and their analyze

    Directory of Open Access Journals (Sweden)

    Prokofyeva A.S.

    2014-12-01

    Full Text Available The aim: to analyze the real power frequency magnetic field (50 Hz values near power lines. The material. Long-term measurements of the power frequency magnetic field (50 Hz near power lines of 110 kV, 220 kVand 500 kVin the Moscow region. Methods. Measurements were made by tracks which were perpendicular to the wires. Length of tracks was up to 40 m. Sensor of measurer was located on 1.8 m under the ground. General quantity of measurement points were 1103. The results. Was obtained general characteristics of real values of strength of electric field and values of magnetic flux density depending to distance to the projection last wire near power lines. Conclusion. Analysis of the results has the values of the magnetic field of power lines correspond to the Russian rules in all cases. Using additional World Health Organization safety criteria for magnetic fields (the class of carcinogenic risks 2B requires the expansion of the health safety zone 2-3 times.

  3. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    2009-12-01

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  4. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  5. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  6. TEP Power Partners Project [Tucson Electric Power

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-02-06

    The Arizona Governor’s Office of Energy Policy, in partnership with Tucson Electric Power (TEP), Tendril, and Next Phase Energy (NPE), formed the TEP Power Partners pilot project to demonstrate how residential customers could access their energy usage data and third party applications using data obtained from an Automatic Meter Reading (AMR) network. The project applied for and was awarded a Smart Grid Data Access grant through the U.S. Department of Energy. The project participants’ goal for Phase I is to actively engage 1,700 residential customers to demonstrate sustained participation, reduction in energy usage (kWh) and cost ($), and measure related aspects of customer satisfaction. This Demonstration report presents a summary of the findings, effectiveness, and customer satisfaction with the 15-month TEP Power Partners pilot project. The objective of the program is to provide residential customers with energy consumption data from AMR metering and empower these participants to better manage their electricity use. The pilot recruitment goals included migrating 700 existing customers from the completed Power Partners Demand Response Load Control Project (DRLC), and enrolling 1,000 new participants. Upon conclusion of the project on November 19, 2013; 1,390 Home Area Networks (HANs) were registered; 797 new participants installed a HAN; Survey respondents’ are satisfied with the program and found value with a variety of specific program components; Survey respondents report feeling greater control over their energy usage and report taking energy savings actions in their homes after participating in the program; On average, 43 % of the participants returned to the web portal monthly and 15% returned weekly; and An impact evaluation was completed by Opinion Dynamics and found average participant savings for the treatment period1 to be 2.3% of their household use during this period.2 In total, the program saved 163 MWh in the treatment period of 2013.

  7. Phased Array Excitations For Efficient Near Field Wireless Power Transmission

    Science.gov (United States)

    2016-09-01

    channeled to the battery or power plant. Figure 2. WPT System Block Diagram for Battery Charging. Source : [2]. Wireless power transfer has gained...EXCITATIONS FOR EFFICIENT NEAR-FIELD WIRELESS POWER TRANSMISSION by Sean X. Hong September 2016 Thesis Advisor: David Jenn Second Reader...TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE PHASED ARRAY EXCITATIONS FOR EFFICIENT NEAR-FIELD WIRELESS POWER TRANSMISSION 5

  8. Project management skills for nuclear power plants

    International Nuclear Information System (INIS)

    Bhatikar, R.J.

    2002-01-01

    Full text: The E and C Division of L and T has executed several power projects in India and abroad and thus possesses the requisite wherewithal to execute nuclear power projects on a fast track basis. To achieve this L and T has set up a separate Strategic Business Unit (SBU) to have a focused attention to the nuclear power industry in the country. All the four important and necessary hallmarks for successful implementation of any project namely (i) engineering capabilities, (ii) sophisticated project management tools, (iii) ability to mobilize resources, and (iv) skilled personnel to execute the project have been adequately addressed. These could be realized either by establishing fruitful collaborations with other specialist Companies and/or creating powerful and multitasking software tools for effective implementation. The execution of nuclear power projects on a fast track basis could be implemented by following the EPC route and by minimizing the number of packages. Details of this scheme for project implementation will be highlighted during the talk

  9. The planning of areas near nuclear power stations

    International Nuclear Information System (INIS)

    1977-01-01

    During the past five years national physical planning has been initiated by the Swedish Parliament. Guidelines have been given to the communities how to consider national interests when drawing up local planning and how to produce maps and descriptions of the planning. For the planning of the areas near the nuclear power stations the municipalities have certain guidelines from The Nuclear Power Inspectorate and The National Institute of Radiation Protection. It is advised to keep a low population density near the power plants, to avoid the type of harbour or industry which could have disturbing effects on the power plant and also to avoid to concentrate people, who are difficult to move from the area in case of an accident (i.e., homes for old people, maternity homes and prisons). The plants on the East Coast, Forsmark and Oskarshamn, are located in wooded areas with a very low population density. On the West Coast, near Ringhals and Barsebaeck, the population density is higher, and there is one village with about 2,000 inhabitants, situated at a distance of two (2) km from the Ringhals power plant. The Control Boards are now reluctant to concentrate more people in this village, where schools and shops were earlier planned for 3,000 inhabitants. The building activity near power plants is regulated by law. New buildings are prohibited within a distance of two (2) km from the plants. Some exeptions can be granted by the County Administrative Board after guidance from the Central Board. In a zone reaching 10 kilometers from the power plants there are no regulations by law about new buildings, except the earlier mentioned guidelines from the Central Boards to maintain a low population. (L.E.)

  10. Study of tidal power projects in the UK, with the exception of the Severn barrage

    International Nuclear Information System (INIS)

    Shaw, T.L.

    1997-01-01

    Several estuaries in the UK could be equipped with barrages and tidal power plants and several projects were proposed and studied from the end of the 1960's and 1989, until the electric power industry was privatized. Five projects revealed to be more promising than others: the Conwy estuary in the north of Wales, for which the feasibility study concluded that there was no serious environmental constraints on the project; Duddon, a little bit more in the north, which appears to be not economically interesting; Loughor, in the south of Wales, a small size project for which no advanced ecological consequences studies were carried out; Mersey, near Liverpool, the most important project (700 MW) which stands a good chance of being realized; the Wyre estuary, between Duddon and Mersey, for which the cost seems to be prohibitive. The economical conditions which started in the 1980's are largely responsible for the stand-by of any of these projects. The tide power kWh production cost continues to be viewed as two times more expensive than it would be with a classical power plant. Of course, this cost takes into account the actions for environmental protection. (J.S.)

  11. 25 CFR 169.27 - Power projects.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  12. The NASA CSTI High Capacity Power Project

    International Nuclear Information System (INIS)

    Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Schmitz, P.; Vandersande, J.

    1992-01-01

    This paper describes the elements of NASA's CSTI High Capacity Power Project which include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timeliness recently developed

  13. Independent power project finance rating criteria

    International Nuclear Information System (INIS)

    Goldsmith, D.; Chew W.; Moulton, C.

    1992-01-01

    Continuing growth of project financing for non-utility generators in the US and abroad has led to growing focus on their credit strength. In general, the financings remain relatively risky and would likely be rated below investment grade, because of various factors: loose power purchase arrangements, poor match between power pricing and fuel costs, aggressive leverage, troubled operating performance. But S and P believes some projects have the credit strength to support investment grade ratings. As traditional financing markets for these projects --- bank lending and private placements with highly specialized institutional investors --- have contracted, project sponsors and developers are considering broader markets. These include institutional investors without specialized focus on power project finance. In these markets, distinctions among projects may lead to greater liquidity and efficiency in developing the pricing and terms under which projects can be financed. This paper reports that ratings are most appropriate for projects seeking permanent financing as they enter commercial operations. They also may be useful for projects which have been operating for some time and for some very strong projects which are raising construction financing. To guide both project developers and investors in project financing, S and P has developed the following approach for rating these types of financings

  14. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  15. Financing power projects in emerging markets

    International Nuclear Information System (INIS)

    Matsumoto, G.T.

    1996-01-01

    Financing for power generation projects in the developing countries of the world has been provided by the United States Export-Import Bank. The loans provided by its new Project Finance Division, totalling $8.3 billion are described. The future of project financing for the power generation industry should, it is argued, rest not with government financing agencies, but with private sector financial markets. (UK)

  16. High risk behaviour near OPG dams and power stations : results from two surveys

    Energy Technology Data Exchange (ETDEWEB)

    Giesbrecht, N.; Schmidt, R.; Ialomiteanu, A. [Centre for Addiction and Mental Health, Toronto, ON (Canada)

    2009-07-01

    High risk behaviour near dams is not uncommon. This presentation discussed the results from 2 surveys on high risk behaviour near dams and power stations operated by Ontario Power Generation (OPG). The main components of the project were presented, with particular reference to analyses of recent literature on high-risk behaviour; interviews with OPG managers and staff in 4 regions; main survey of respondents from 4 regions; follow-up interviews with high-risk respondents; interviews with community members and contacts from recreational associations; and recommendations. Specific questions and results were provided from each survey. From the first survey, the characteristics of respondents that used OPG sites for recreation were identified. One hundred high risk respondents completed a follow-up interview. The survey showed that although high-risk behaviour is not uncommon, the main reason people use the facilities are for recreation and relaxation, and not for thrill seeking purposes. Recommendations stemming from the surveys included the need for definition of boundaries and delivery of messages via children, recreational associations, and law enforcement personnel. tabs., figs.

  17. Application of Nearly Linear Solvers to Electric Power System Computation

    Science.gov (United States)

    Grant, Lisa L.

    To meet the future needs of the electric power system, improvements need to be made in the areas of power system algorithms, simulation, and modeling, specifically to achieve a time frame that is useful to industry. If power system time-domain simulations could run in real-time, then system operators would have situational awareness to implement online control and avoid cascading failures, significantly improving power system reliability. Several power system applications rely on the solution of a very large linear system. As the demands on power systems continue to grow, there is a greater computational complexity involved in solving these large linear systems within reasonable time. This project expands on the current work in fast linear solvers, developed for solving symmetric and diagonally dominant linear systems, in order to produce power system specific methods that can be solved in nearly-linear run times. The work explores a new theoretical method that is based on ideas in graph theory and combinatorics. The technique builds a chain of progressively smaller approximate systems with preconditioners based on the system's low stretch spanning tree. The method is compared to traditional linear solvers and shown to reduce the time and iterations required for an accurate solution, especially as the system size increases. A simulation validation is performed, comparing the solution capabilities of the chain method to LU factorization, which is the standard linear solver for power flow. The chain method was successfully demonstrated to produce accurate solutions for power flow simulation on a number of IEEE test cases, and a discussion on how to further improve the method's speed and accuracy is included.

  18. The solar two power tower project

    International Nuclear Information System (INIS)

    Chavez, J.M.; Klimas, P.C.; Laquil, P. de III; Skowronski, M.

    1993-01-01

    A consortium of United States utility concerns led by Southern California Edison Company (SCE) has begun a cooperative project with the U.S. Department of Energy (DOE) and industry to convert the 10-MWe Solar One Tower Pilot Plant to molten nitrate salt technology. Successful operation of the convert plant to be called Solar Two, will reduce the economic risks in building the initial commercial power tower projects and accelerate the commercial acceptance of this promising renewable energy technology. In a molten salt power tower plant, sunlight is concentrated by a field of sun-tracking mirrors, called heliostats, onto a centrally located receiver, atop a tower. Molten salt is heated in the receiver and stored until it is needed to generate steam to power a conventional turbine generator. Joining the SCE and DOE in sponsoring in sponsoring this project are the following organizations: Los Alamos department of Water Power, Idaho Power Company, PacifiCorp, Pacific Gas and Electric Company, Sacramento Municipal Utility District, Arizona Public Service Company, Salt River Project, City of Pasadena, California Energy Commission, Electric Power Research Institute, South Coast Air Quality Commission, Electric Power research Institute, South Coast Air Quality Management District, and Bechtel Corporation. The Solar Two project will convert the Solar One heat transfer system from a water/steam type to molten nitrate salt by replacing the water/steam receiver and oil/rock thermal storage system with a nitrate salt receiver, salt thermal storage, and steam generator. The estimate cost of Solar Two, including 3-year test period, is 48.5 millions. The plant will be on line in early 1995. (authors)

  19. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  20. Unidirectional wireless power transfer using near-field plates

    International Nuclear Information System (INIS)

    Imani, Mohammadreza F.; Grbic, Anthony

    2015-01-01

    One of the obstacles preventing wireless power transfer from becoming ubiquitous is their leakage of power: high-amplitude electromagnetic fields that can interfere with other electronic devices, increase health concerns, or hinder power metering. In this paper, we present near-field plates (NFPs) as a novel method to tailor the electromagnetic fields generated by a wireless power transfer system while maintaining high efficiency. NFPs are modulated arrays or surfaces designed to form prescribed near-field patterns. The NFP proposed in this paper consists of an array of loaded loops that are designed to confine the electromagnetic fields of a resonant transmitting loop to the desired direction (receiving loop) while suppressing fields in other directions. The step-by-step design procedure for this device is outlined. Two NFPs are designed and examined in full-wave simulation. Their performance is shown to be in close agreement with the design predictions, thereby verifying the proposed design and operation. A NFP is also fabricated and experimentally shown to form a unidirectional wireless power transfer link with high efficiency

  1. Unidirectional wireless power transfer using near-field plates

    Energy Technology Data Exchange (ETDEWEB)

    Imani, Mohammadreza F., E-mail: mohamad.imani@gmail.com [Center for Metamaterials and Integrated Plasmonics, Department of Electrical and Computer Engineering, Duke University, Durham, North Carolina 27708 (United States); Grbic, Anthony [Radiation Laboratory, Department of Electrical Engineering and Computer Science, University of Michigan, Ann Arbor, Michigan 48109 (United States)

    2015-05-14

    One of the obstacles preventing wireless power transfer from becoming ubiquitous is their leakage of power: high-amplitude electromagnetic fields that can interfere with other electronic devices, increase health concerns, or hinder power metering. In this paper, we present near-field plates (NFPs) as a novel method to tailor the electromagnetic fields generated by a wireless power transfer system while maintaining high efficiency. NFPs are modulated arrays or surfaces designed to form prescribed near-field patterns. The NFP proposed in this paper consists of an array of loaded loops that are designed to confine the electromagnetic fields of a resonant transmitting loop to the desired direction (receiving loop) while suppressing fields in other directions. The step-by-step design procedure for this device is outlined. Two NFPs are designed and examined in full-wave simulation. Their performance is shown to be in close agreement with the design predictions, thereby verifying the proposed design and operation. A NFP is also fabricated and experimentally shown to form a unidirectional wireless power transfer link with high efficiency.

  2. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  3. Nuclear power: Financing big projects

    International Nuclear Information System (INIS)

    Raabe, G.

    1992-01-01

    Since the early seventies, the Dresdner Bank AG has been intensively engaged in financing nuclear power plants, e.g., the Muelheim-Kaerlich Nuclear Power Station currently down because of legal technicaltities. The bank has also been involved in other large-scale projects in the energy sector and, in addition, has conceptually accompanied the stages of the nuclear fuel cycle, such as enrichment, fuel element fabrication, and reprocessing. However, for political reasons it has not been possible to carry out these projects and finance them in the Federal Republic. With appropriate modifications, these financial models can also be transferred to international projects; after all, the enrichment sector has always been characterized by trilateral ventures. (orig.) [de

  4. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  5. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  6. Financing of nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1991-06-01

    This document is a summary of the ''Topical Seminar on Financing of Nuclear Power Projects in Developing Countries, held in Jakarta between 4-7 September, 1990. The seminar presentations were divided into the following sessions: Keynote session (3 papers), Perspective of Nuclear and Fossil-fired Generation Costs (9 papers), Assessment of Problems and Constraints for the Financing of Large Power Projects, with particular Attention to Nuclear Power Projects (9 papers), Mechanisms for Financing Nuclear Power Projects in Developing Countries (11 papers). A separate abstract was prepared for each of these papers. Refs, figs, tabs and charts

  7. Great expectations. Projections of nuclear power around the world

    International Nuclear Information System (INIS)

    McDonald, Alan; Rogner, Hans-Holger; Gritsevskyi, Andrii

    2009-01-01

    In its 2008 edition of Energy, Electricity and Nuclear Power Estimates for the Period to 2030, the International Atomic Energy Agency (IAEA) has again revised its projections for nuclear power upwards. Every year since 1981 the IAEA has published 2 updated projections for the world's nuclear power generating capacity, a low projection and a high projection. The low projection is a down to earth, business-as-usual projection. The high projection takes into account government and corporate announcements about longer-term plans for nuclear investments as well as potential new national policies, e.g., to combat climate change. The results for the 2008 projections are presented. In the low projection, the projected nuclear power capacity in 2030 is 473 GW(e), some 27% higher than today's 372 GW(e). In the high projection, nuclear capacity in 2030 is 748 GW(e), double today's capacity. But while projections for nuclear power's future rose, its share of the world's electricity generation today dropped from 15% in 2006 to 14% in 2007. The main reason is that while total global electricity generation rose 4.8% from 2007 to 2008, nuclear electricity actually dropped slightly. The overall message from the IAEA's 2008 edition of Energy, Electricity and Nuclear Power Estimates for the Period to 2030 is that global electricity use will grow significantly, that nuclear power will have to expand more rapidly than it has done recently in order to maintain its share, and that nuclear power can meet the challenge. (orig.)

  8. Financing arrangements for nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1993-01-01

    This reference book reviews the main features and problems or difficulties involved in the financing of nuclear power projects with special reference to developing countries. It provides basic information and advice to developing countries interested in nuclear power projects as part of their power sector planning. The book outlines the general characteristics of financing a nuclear power project and presents innovative approaches for power generation financing. It discusses the special conditions and requirements of nuclear power projects and their financing complexities. The focus is on the practical issues that need to be dealt with in order to successfully finance these power projects, as well as the constraints faced by most developing countries. Possible ways and means of dealing with these constraints are presented. 58 refs, figs and tabs

  9. Project-90 Near-field calculations using CALIBRE

    International Nuclear Information System (INIS)

    Worgan, K.; Robinson, P.

    1992-02-01

    A comprehensive set of near-field calculations for the Swedish Nuclear Power Inspectorates Project-90 safety assessment has been performed using the CALIBRE model. In the majority of cases considered the redox front migrates through the bentonite buffer and into the rock, where it becomes effectively immobilised. The fracture remains in a reducing state, which means that for solubility-limited nuclides, the concentration at the bentonite/fracture interface can never be greater than the reducing solubility limit. The calculations also show that significant retardation occurs for nuclides which are even moderately sorbed. The effect is less pronounced in the wider fracture and high flow cases, as the opportunity for diffusion from the fracture to the rock matrix is reduced. In contrast, the release from the near-field of poorly-sorbed nuclides which are not solubility limited is governed by the release rate from the fuel, the diffusive mass transfer resistance of the buffer, rock matrix and fracture, the initial inventories and the nuclide half-lives. In the reference case, the maximum dose potential of nuclides emerging from the near-field occur for I-129 and was 3.2 x 10 -7 Sv per canister-year, assuming the flux to be discharged directly into the wall receptor biosphere. The parameters which have the most impact on the reference base results are high flow, wide aperture and poor chemistry (i.e. high solubility limits and low sorption distribution coefficients). The effects of combining extreme values of parameters does not give results which are in proportion to their effect when applied in isolation. In the worst case variant (early canister failure high flow, wide aperture and poor chemistry) the maximum dose potential is 1.0 x 10 -4 Sv per canister-year, compared with 8.9 x 10 -6 Sv in the high flow case, 4.5 x 10 -7 in the wide aperture case, 2.3 x 10 -6 in the poor chemistry case and 3.9 x 10 -6 in the early failure, wide aperture and high flow case. (au)

  10. Near-term and next-generation nuclear power plant concepts

    International Nuclear Information System (INIS)

    Shiga, Shigenori; Handa, Norihiko; Heki, Hideaki

    2002-01-01

    Near-term and next-generation nuclear reactors will be required to have high economic competitiveness in the deregulated electricity market, flexibility with respect to electricity demand and investment, and good public acceptability. For near-term reactors in the 2010s, Toshiba is developing an improved advanced boiling water reactor (ABWR) based on the present ABWR with newly rationalized systems and components; a construction period of 36 months, one year shorter than the current period; and a power lineup ranging from 800 MWe to 1,600 MWe. For future reactors in the 2020s and beyond, Toshiba is developing the ABWR-II for large-scale, centralized power sources; a supercritical water-cooled power reactor with high thermal efficiency for medium-scale power sources; a modular reactor with siting flexibility for small-scale power sources; and a small, fast neutron reactor with inherent safety for independent power sources. From the viewpoint of efficient uranium resource utilization, a low-moderation BWR core with a high conversion factor is also being developed. (author)

  11. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  12. Concentrating Solar Power Projects - Khi Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL Khi Solar One This page provides information on Khi Solar One, a concentrating solar power (CSP) project, with data organized by background, parcipants and power plant configuration . Status Date: February 8, 2016 Project Overview Project Name: Khi Solar One Country: South Africa Location

  13. Review to give the public clear information on near surface disposal project of low-level radioactive wastes generated from research, industrial and medical facilities

    International Nuclear Information System (INIS)

    Shobu, Nobuhiro; Amazawa, Hiroya; Koibuchi, Hiroto; Nakata, Hisakazu; Kato, Masatoshi; Takao, Tomoe; Terashima, Daisuke; Tanaka, Yoshie; Shirasu, Hisanori

    2013-12-01

    Japan Atomic Energy Agency (hereafter abbreviated as “JAEA”) has promoted near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities after receiving project approval from the government in November 2009. JAEA has carried out public information about low-level radioactive wastes disposal project on the web site. When some town meetings are held toward mutual understanding with the public, more detailed and clear explanations for safety management of near surface disposal are needed especially. Therefore, the information provision method to make the public understand should be reviewed. Moreover, a web-based survey should be carried out in order to get a sense of what the public knows, what it values and where it stands on nuclear energy and radiation issues, because the social environment surrounding nuclear energy and radiation issues has drastically changed as a result of the accident at the Fukushima Daiichi Nuclear Power Station on March 11, 2011. This review clarified the points to keep in mind about public information on near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities, and that public awareness and understanding toward nuclear energy and radiation was changed before and after the accident at Fukushima Daiichi Nuclear Power Plant. (author)

  14. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  15. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  16. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  17. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  18. Wave Power Demonstration Project at Reedsport, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    Mekhiche, Mike [Principal Investigator; Downie, Bruce [Project Manager

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  19. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  20. Economics of nuclear power projects

    International Nuclear Information System (INIS)

    Chu, I.H.

    1985-01-01

    Nuclear power development in Taiwan was initiated in 1956. Now Taipower has five nuclear units in smooth operation, one unit under construction, two units under planning. The relatively short construction period, low construction costs and twin unit approach had led to the significant economical advantage of our nuclear power generation. Moreover betterment programmes have further improved the availability and reliability factors of our nuclear power plants. In Taipower, the generation cost of nuclear power was even less than half of that of oil-fired thermal power in the past years ever since the nuclear power was commissioned. This made Taipower have more earnings and power rates was even dropped down in March 1983. As Taiwan is short of energy sources and nuclear power is so well-demonstrated nuclear power will be logically the best choice for Taipower future projects

  1. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2005-01-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  2. The trillion dollar power project jackpot

    International Nuclear Information System (INIS)

    Roseman, E.J.

    1994-01-01

    International power needs, if not insatiable, are certainly of a magnitude beyond anything heretofore imagined. The international opportunities for independent power development are huge: Power Plants -- $700 to $800 billion worth of the new facilities will be needed by the year 2000; Transmission and Distribution -- Expansion of services will require an additional $300 to $400 billion; and Repowering and Improving Existing Plants -- The estimate is $40-$60 billion. RCG/Hagler, Bailly tracks the international power project development activities of over a hundred developers, and monitors the emerging private power market in Europe, Asia, and Latin America. On behalf of private clients and multi-lateral institutions, the authors have worked in more than three dozen countries in the past two years. There are far-reaching global implications involved in this massive movement toward independent power projects. New levels of international economic growth depend on it. Far greater energy efficiencies must accompany it. Environmental problems which will arise must be recognized and solved. The results from the trillion dollars that are to be invested will be far-reaching, dramatic, and vastly beneficial

  3. Assessment and financing of electric power projects

    International Nuclear Information System (INIS)

    Moscote, R.A.

    1976-01-01

    The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  4. Residential mobility of populations near UK power lines and implications for childhood leukaemia

    International Nuclear Information System (INIS)

    Swanson, John

    2013-01-01

    Epidemiological studies suggest associations between childhood leukaemia and living near high-voltage power lines, but the most obvious potential causative agent, the magnetic fields produced by the power lines, is not supported by laboratory studies or a known mechanism. An alternative hypothesised explanation is if there is greater population mobility near power lines, linking to the findings of Kinlen that population mixing increases leukaemia rates. We used the names recorded in electoral registers to see whether people near power lines move house more often than the population as a whole. We did find variations, but only small ones, and not such as to support the hypothesis. (note)

  5. Near field wireless power transfer using curved relay resonators for extended transfer distance

    International Nuclear Information System (INIS)

    Zhu, D; Beeby, S P; Clare, L; Stark, B H

    2015-01-01

    This paper investigates the performance of a near field wireless power transfer system that uses curved relay resonator to extend transfer distance. Near field wireless power transfer operates based on the near-field electromagnetic coupling of coils. Such a system can transfer energy over a relatively short distance which is of the same order of dimensions of the coupled coils. The energy transfer distance can be increased using flat relay resonators. Recent developments in printing electronics and e-textiles have seen increasing demand of embedding electronics into fabrics. Near field wireless power transfer is one of the most promising methods to power electronics on fabrics. The concept can be applied to body-worn textiles by, for example, integrating a transmitter coil into upholstery, and a flexible receiver coil into garments. Flexible textile coils take on the shape of the supporting materials such as garments, and therefore curved resonator and receiver coils are investigated in this work. Experimental results showed that using curved relay resonator can effectively extend the wireless power transfer distance. However, as the curvature of the coil increases, the performance of the wireless power transfer, especially the maximum received power, deteriorates. (paper)

  6. Application study of the project management on the nuclear power projects in China Institute of Atomic Energy

    International Nuclear Information System (INIS)

    Ji Cunxing

    2012-01-01

    The article introduced the actions of foreign and domestic nuclear power technical services in China Institute of Atomic Energy, the project management theory is applied to the organization, implementation and control of the nuclear power projects. It is analyzed the quality, schedule , investment etc of nuclear power projects, the improving measures and suggestions are bring forward on the project management organization, quality assurance, reduce cost etc. It will raise its nuclear power project management level in China Institute of Atomic Energy. (author)

  7. Thermal Power Systems, Point-Focusing Distributed Receiver Technology Project. Annual technical report, Fiscal Year 1978. Volume II. Detailed report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-15

    Thermal or electrical power from the sun's radiated energy through Point-Focusing Distributed Receiver technology is the goal of this Project. The energy thus produced must be economically competitive with other sources. This Project supports the industrial development of technology and hardware for extracting energy from solar power to achieve the stated goal. Present studies are working to concentrate the solar energy through mirrors or lenses, to a working fluid or gas, and through a power converter change it to an energy source useful to man. Rankine-cycle and Brayton-cycle engines are currently being developed as the most promising energy converters for our near future needs. Accomplishments on point-focusing technology in FY 1978 are detailed.

  8. Concentrating Solar Power Projects - KaXu Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL KaXu Solar One This page provides information on KaXu Solar One, a concentrating solar power (CSP) project, with data organized by background, parcipants and power plant configuration . Status Date: April 14, 2015 Project Overview Project Name: KaXu Solar One Country: South Africa Location

  9. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  10. Increased wheeze but not bronchial hyperreactivity near power stations.

    Science.gov (United States)

    Halliday, J A; Henry, R L; Hankin, R G; Hensley, M J

    1993-08-01

    In a previous study a higher than expected prevalence of asthma was found in Lake Munmorah, a coastal town near two power stations, compared with another coastal control town. This study aimed to compare atopy, bronchial hyperreactivity, and reported symptoms of asthma in the power station town and a second control area with greater socioeconomic similarity. A cross sectional survey was undertaken. Lake Munmorah, a coastal town near two power stations, and Dungog, a country town in the Hunter Valley, NSW, Australia. All children attending kindergarten to year 6 at all schools in the two towns were invited to participate in 1990. The response rates for the questionnaire for reported symptoms and associated demographic data were 92% in Lake Munmorah and 93% in Dungog, with 84% and 90% of children respectively being measured for lung function, atopy, and bronchial reactivity. There were 419 boys and 432 girls aged 5 to 12 years. Main outcome measures were current wheeze and bronchial hyper-reactivity, defined as a fall in forced expiratory volume in 1 second (FEV1) or peak expiratory flow (PEF) of 20% or more. Current wheeze was reported in 24.8% of the Lake Munmorah children compared with 14.6% of the Dungog children. Bronchial hyper-reactivity was similar for both groups--25.2% in Lake Munmorah and 22.3% in Dungog. The mean baseline FEV1 was lower in Lake Munmorah than in Dungog (p power station town, but bronchial hyper-reactivity and skin test defined atopy were similar in the two communities. These results are consistent with the previous study and confirm the increased presence of reported symptomatic illness in the town near power stations.

  11. Progress update of NASA's free-piston Stirling space power converter technology project

    Science.gov (United States)

    Dudenhoefer, James E.; Winter, Jerry M.; Alger, Donald

    1992-01-01

    A progress update is presented of the NASA LeRC Free-Piston Stirling Space Power Converter Technology Project. This work is being conducted under NASA's Civil Space Technology Initiative (CSTI). The goal of the CSTI High Capacity Power Element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system power output and system thermal and electric energy conversion efficiency at least five fold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. This paper will discuss progress toward 1050 K Stirling Space Power Converters. Fabrication is nearly completed for the 1050 K Component Test Power Converter (CTPC); results of motoring tests of the cold end (525 K), are presented. The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, bearings, superalloy joining technologies, high efficiency alternators, life and reliability testing, and predictive methodologies. This paper will compare progress in significant areas of component development from the start of the program with the Space Power Development Engine (SPDE) to the present work on CTPC.

  12. Power-law scaling of extreme dynamics near higher-order exceptional points

    Science.gov (United States)

    Zhong, Q.; Christodoulides, D. N.; Khajavikhan, M.; Makris, K. G.; El-Ganainy, R.

    2018-02-01

    We investigate the extreme dynamics of non-Hermitian systems near higher-order exceptional points in photonic networks constructed using the bosonic algebra method. We show that strong power oscillations for certain initial conditions can occur as a result of the peculiar eigenspace geometry and its dimensionality collapse near these singularities. By using complementary numerical and analytical approaches, we show that, in the parity-time (PT ) phase near exceptional points, the logarithm of the maximum optical power amplification scales linearly with the order of the exceptional point. We focus in our discussion on photonic systems, but we note that our results apply to other physical systems as well.

  13. Concentrating Solar Power Projects - Dish/Engine Projects | Concentrating

    Science.gov (United States)

    Solar Power | NREL Dish/Engine Projects Photo of several flat, octagonal panels arranged together to form a dish-shaped structure. The receiver is supported above the panels by an arm-like of the panels. These dish/Stirling units are being tested at Sandia National Laboratories in

  14. Living near nuclear power plants and thyroid cancer risk: A systematic review and meta-analysis

    International Nuclear Information System (INIS)

    Kim, Jae Young; Bang, Ye Jin; Ee, Won Jin

    2016-01-01

    There has been public concern regarding the safety of residing near nuclear power plants, and the extent of risk for thyroid cancer among adults living near nuclear power plants has not been fully explored. In the present study, a systematic review and meta-analysis of epidemiologic studies was conducted to investigate the association between living near nuclear power plants and the risk of thyroid cancer. Our study does not support an association between living near nuclear power plants and risk of thyroid cancer but does support a need for well designed future studies given the conflicting results from sensitivity analysis.

  15. Living near nuclear power plants and thyroid cancer risk: A systematic review and meta-analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Young [Dept. of Preventive Medicine, Keimyung University College of Medicine, Daegu (Korea, Republic of); Bang, Ye Jin; Ee, Won Jin [Dept. of Preventive Medicine, Korea University College of Medicine, Seoul (Korea, Republic of)

    2016-04-15

    There has been public concern regarding the safety of residing near nuclear power plants, and the extent of risk for thyroid cancer among adults living near nuclear power plants has not been fully explored. In the present study, a systematic review and meta-analysis of epidemiologic studies was conducted to investigate the association between living near nuclear power plants and the risk of thyroid cancer. Our study does not support an association between living near nuclear power plants and risk of thyroid cancer but does support a need for well designed future studies given the conflicting results from sensitivity analysis.

  16. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  17. An Ensemble Successive Project Algorithm for Liquor Detection Using Near Infrared Sensor.

    Science.gov (United States)

    Qu, Fangfang; Ren, Dong; Wang, Jihua; Zhang, Zhong; Lu, Na; Meng, Lei

    2016-01-11

    Spectral analysis technique based on near infrared (NIR) sensor is a powerful tool for complex information processing and high precision recognition, and it has been widely applied to quality analysis and online inspection of agricultural products. This paper proposes a new method to address the instability of small sample sizes in the successive projections algorithm (SPA) as well as the lack of association between selected variables and the analyte. The proposed method is an evaluated bootstrap ensemble SPA method (EBSPA) based on a variable evaluation index (EI) for variable selection, and is applied to the quantitative prediction of alcohol concentrations in liquor using NIR sensor. In the experiment, the proposed EBSPA with three kinds of modeling methods are established to test their performance. In addition, the proposed EBSPA combined with partial least square is compared with other state-of-the-art variable selection methods. The results show that the proposed method can solve the defects of SPA and it has the best generalization performance and stability. Furthermore, the physical meaning of the selected variables from the near infrared sensor data is clear, which can effectively reduce the variables and improve their prediction accuracy.

  18. An Ensemble Successive Project Algorithm for Liquor Detection Using Near Infrared Sensor

    Directory of Open Access Journals (Sweden)

    Fangfang Qu

    2016-01-01

    Full Text Available Spectral analysis technique based on near infrared (NIR sensor is a powerful tool for complex information processing and high precision recognition, and it has been widely applied to quality analysis and online inspection of agricultural products. This paper proposes a new method to address the instability of small sample sizes in the successive projections algorithm (SPA as well as the lack of association between selected variables and the analyte. The proposed method is an evaluated bootstrap ensemble SPA method (EBSPA based on a variable evaluation index (EI for variable selection, and is applied to the quantitative prediction of alcohol concentrations in liquor using NIR sensor. In the experiment, the proposed EBSPA with three kinds of modeling methods are established to test their performance. In addition, the proposed EBSPA combined with partial least square is compared with other state-of-the-art variable selection methods. The results show that the proposed method can solve the defects of SPA and it has the best generalization performance and stability. Furthermore, the physical meaning of the selected variables from the near infrared sensor data is clear, which can effectively reduce the variables and improve their prediction accuracy.

  19. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  20. Intertidal ecology of the sea shore near Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Balani, M.C.

    1975-01-01

    Surveys were carried out between March 1969 and August 1970 to study the fauna and flora in the littoral zone of the sea shore near the Tarapur Atomic Power Station. The beach adjacent to the Station is rocky with a number of tidal pools inhabited by a variety of organisms whereas the beach to the south is mostly sandy and barren except for a small rocky stretch. The tidal range is 6 m and over a mile of beach is exposed during low tide. The near shore currents are very strong and have a clear northsouth oscillation with the changing tides. Less Atherina sp. fry were available near the Power Station in March 1970 than during the previous year. Possible reasons for these differences are discussed, including the effect of heated discharges on biota. The need is also emphasized to monitor the biota (Plankton, Nekton and Benthos) systematically for content of fission products released by the Power Station. (auth.)

  1. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  2. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  3. Experience in independent power production: Two projects that closed

    Energy Technology Data Exchange (ETDEWEB)

    Kappaz, M.H.

    1994-12-31

    K and M Engineering and Consulting Corporation`s experience in independent power production is outlined. The following topics are discussed: the KMR Power Corporation, K and M strengths and strategy, key success factors, project experience, selected projects, and capital structure.

  4. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  5. Bats and bat habitats : guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-03-01

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  6. Bats and bat habitats : guidelines for wind power projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  7. Measures to improve nuclear power project management

    International Nuclear Information System (INIS)

    Ma Xinchao

    2012-01-01

    Focusing on correct application of ability level principle in setting organizational structure, the effective management system has been established, and 8 practical management regimes have been developed. Personnel training and management work shall be well done and enhanced. Experience feedback in construction management shall be well done for all systems. Exchange of construction and management techniques shall be actively carried out. All staff shall participate in safety management. KPI system is adopted for assessing stakeholders' project management method, and PDCA cycle is adopted for continued improved. Management level upgrading measures are proposed to ensure the smooth construction of nuclear power project. Setting forth and popularizing management theory can provide reference for and promote the smooth progress of various nuclear power projects. (author)

  8. Project quality management under EPC mode by the owner of nuclear power plant

    International Nuclear Information System (INIS)

    Xu Hui; Hu Miao

    2014-01-01

    As the first completely independent nuclear power project in China, Fangjiashan nuclear power project is constructed under EPC mode of general project contracting. This paper, taking the project as an example, aims to explore how the project owners carry out quality management for the installation project during the construction of the nuclear power plant based on EPC mode. It has certain reference value for the management of following nuclear power projects which adopting the EPC construction mode. It will play a positive role in improving China's overall self-management abilities in the nuclear power construction, and lay a solid foundation for follow-up nuclear power construction in China. (authors)

  9. FGD Franchising Pilot Project of Thermal Power Plants

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At...

  10. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  11. Natural radionuclides near a coal-fired power station

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Briggs, J L

    1984-06-15

    An experiment was carried out to measure the specific activity of Pb-210 and Po-210 in livers from cattle that had grazed in a field near Didcot coal-fired power station. Livers from cattle in the Cotswold region were measured for comparison. The specific activities of Pb-210 and Po-210 in soil and grass samples from both areas were also measured at 3-monthly intervals over a year. No statistically significant increases were observed in the Pb-210 and Po-210 levels in liver, soil or grass samples which could be attributed to the operation of the power station.

  12. Preliminary evaluation of the Section 1603 treasury grant program for renewable power projects in the United States

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-01-01

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the US to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the US in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 in the absence of the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the US during the construction phase of these wind projects, and 3860 long-term FTE gross jobs during the operational phase. The program's popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread 'gold-plating' or performance problems. (author)

  13. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  14. 77 FR 67813 - Sam Rayburn Dam Project Power Rate

    Science.gov (United States)

    2012-11-14

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Project Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of Rate Order Approving an Extension of Power Rate on an.... James K. McDonald, Assistant Administrator, Southwestern Power Administration, Department of Energy...

  15. Summer transport patterns affecting the Mohave Power Project emission

    Energy Technology Data Exchange (ETDEWEB)

    Farber, R.J.; Hoffer, T.E.; Green, M.C.; Walsh, P.A. [Southern California Edison, Rosemead, CA (United States)

    1997-03-01

    The Mohave Power Project (MPP) is an isolated 1580-MW coal-fired electric generating plant located in Laughlin, NV. Laughlin is a small desert gambling town situated in the lower Colorado River Valley near the junction of three states: Nevada, California, and Arizona. The location of the MPP is approximately 155 km southwest of the western end of the Grand Canyon National Park and about 240 km southwest from the Grand Canyon Village. This paper describes the summer transport patterns of the MPP emittants using illustrated examples from the Project MOHAVE (measurements of Haze and Visual Effects) 1992 summer intensive study. The intensive study lasted 50 days from mid-July through August and encompassed the major meteorological patterns associated with southwestern US summer meteorology. The MPP emittants were transported towards the Grand Canyon (north to the northeast) during more than 80% of the total hours. Airflow as from the south most of the time due to a combination of the semi-permanent thermal low, differential heating between the Gulf of California and lower Colorado River Valley, and upslope heating of the southern and western slopes of the nearby Colorado Plateau. 14 refs., 12 figs., 2 tabs.

  16. The role of instrumentation and control systems in power uprating projects for nuclear power plants

    International Nuclear Information System (INIS)

    2008-01-01

    The IAEA's activities in nuclear power plant operating performance and life cycle management are aimed at increasing Member State capabilities in utilizing good engineering and management practices developed and transferred by the IAEA. In particular, the IAEA supports activities focusing on the improvement of nuclear power plant (NPP) performance, plant life management, training, power uprating, operational licence renewal, and the modernization of instrumentation and control (I and C) systems of NPPs in Member States. The subject of the I and C systems' role in power uprating projects in NPPs was suggested by the Technical Working Group on Nuclear Power Plant Control and Instrumentation in 2003. The subject was then approved by the IAEA and included in the programmes for 2004-2007. The increasing importance of power uprating projects can be attributed to the general worldwide tendency to the deregulation of the electricity market. The greater demand for electricity and the available capacity and safety margins, as well as the pressure from several operating NPPs resulted in requests for licence modification to enable operation at a higher power level, beyond the original licence provisions. A number of nuclear utilities have already gone through the uprating process for their nuclear reactors, and many more are planning to go through this modification process. In addition to mechanical and process equipment changes, parts of the electrical and I and C systems and components may also need to be altered to accommodate the new operating conditions and safety limits. This report addresses the role of I and C systems in NPP power uprating projects. The objective of the report is to provide guidance to utilities, safety analysts, regulators and others involved in the preparation, implementation and licensing of power uprating projects, with particular emphasis on the I and C aspects of these projects. As the average age of NPPs is increasing, it is becoming common for

  17. Current issues in nuclear power projects decision making

    International Nuclear Information System (INIS)

    Yanev, Y.; Rogner, H.

    2011-01-01

    Concluding Comments: Firm government commitment and support - imminent; New financing approaches/models are emerging, repackaging existing methods and combination of project finance/co-operative mode; Global financial crisis will make financing for investors very challenging, especially for large scale infrastructure projects like NNP –financial regulators to impose tougher rules (Basel III, UK bank levy, US Financial Regulatory Bill, etc; Pure project finance is still challenging for nuclear projects - the availability of finance for new NPPs will depend on the initial government support. This presentation presents a “free market” view on investment in nuclear power projects; If the public sector (governments) wishes to invest in nuclear power as part of its socioeconomic development priorities, finance is not a real obstacle; It becomes an issue in the presence of other equally important development needs and private sector participation is sought

  18. Engineering schedule control of nuclear power project planning and management

    International Nuclear Information System (INIS)

    Meng Hao

    2014-01-01

    Nuclear power design is the important part of project management of nuclear power project, it is the way to control the project organization, design schedule, design progress, design quality and cost control. The good schedule system and control is the key to the success for the project. It is also analyzed the problem during the project, by using some theory and analyze the project structure, design schedule management, IED and document management and interface management propose some new idea for better improve the design management to finally better improve the management quality and efficiency. (author)

  19. 30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.

    Science.gov (United States)

    2010-07-01

    ...-voltage power lines. 56.12071 Section 56.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than trolley...

  20. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  1. PowerMatching City : A unique smart grid project

    NARCIS (Netherlands)

    dr. C.J. Wiekens

    2014-01-01

    In this presentation, the smart grid project 'PowerMatching City' is introduced. PowerMatching City is a living lab demonstration of the future energy system. In PowerMatching City the connected households are equipped with a mix of decentralized energy sources, hybrid heat pumps, smart appliances,

  2. High-power, continuous-wave, single-frequency, all-periodically-poled, near-infrared source.

    Science.gov (United States)

    Devi, Kavita; Chaitanya Kumar, S; Ebrahim-Zadeh, M

    2012-12-15

    We report a high-power, single-frequency, continuous-wave (cw) source tunable across 775-807 nm in the near-infrared, based on internal second harmonic generation (SHG) of a cw singly-resonant optical parametric oscillator (OPO) pumped by a Yb-fiber laser. The compact, all-periodically-poled source employs a 48-mm-long, multigrating MgO doped periodically poled lithium niobate (MgO:PPLN) crystal for the OPO and a 30-mm-long, fan-out grating MgO-doped stoichiometric periodically poled lithium tantalate (MgO:sPPLT) crystal for intracavity SHG, providing as much as 3.7 W of near-infrared power at 793 nm, together with 4 W of idler power at 3232 nm, at an overall extraction efficiency of 28%. Further, the cw OPO is tunable across 3125-3396 nm in the idler, providing as much as 4.3 W at 3133 nm with >3.8  W over 77% of the tuning range together with >3  W of near-infrared power across 56% of SHG tuning range, in high-spatial beam-quality with M2<1.4. The SHG output has an instantaneous linewidth of 8.5 MHz and exhibits a passive power stability better than 3.5% rms over more than 1 min.

  3. Summary of EPRI projects for improving power plant maintenance and maintainability

    International Nuclear Information System (INIS)

    Shugars, H.G.; Poole, D.N.; Pack, R.W.

    1979-01-01

    The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references

  4. Near-Blackbody Enclosed Particle-Receiver Development

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Zhiwen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sakadjian, Bartev [Babcock and Wilcox Research Center, Charlotte, NC (United States)

    2015-12-01

    This 3-year project develops a technology using gas/solid, two-phase flow as a heat-transfer fluid and separated, stable, solid particles as a thermal energy storage (TES) medium for a concentrating solar power (CSP) plant, to address the temperature, efficiency, and cost barriers associated with current molten-salt CSP systems. This project focused on developing a near-blackbody particle receiver and an integrated fluidized-bed heat exchanger with auxiliary components to achieve greater than 20% cost reduction over current CSP plants, and to provide the ability to drive high-efficiency power cycles.

  5. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  6. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  7. Considerations for successful minority investments in independent power projects

    International Nuclear Information System (INIS)

    Bleveans, Lincoln

    1998-01-01

    This article considers the role of lead developers and lead investors, and minority investors in power projects. The risks involved in minority investment without control is examined, and minority investor issues, the 'due diligence' of the minority investor, the need for timely information, and the importance of minority investors to the power project are discussed. (UK)

  8. Mighty vulture back from near extinction Austrian project breeds ...

    African Journals Online (AJOL)

    2007-03-02

    Mar 2, 2007 ... Alpine roosts. Today, however, the bone crusher is soaring toward a comeback as the continent's most ambitious – and priciest – wildlife reintroduction project achieves small but biologically significant success. The species was hunted nearly to extinction in the Alps by the start of the 20th century, mainly by ...

  9. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  10. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  11. Small-scale hydro power in the Anniviers Valley. Project Ayer-Nava. Variants and preliminary project; Forces Motrices de la Gougra SA. Mini-hydraulique en Anniviers. Projet Ayer-Nava. Etude de variantes et avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) reports on the preliminary project for a small hydropower plant near Ayer, a village in the Anniviers Valley (Swiss Alps). Water from the Nava, a steep mountain river, should be lead into a hydraulic scheme for power generation. A hydraulic head of 400 to 550 m is available, depending on the variant considered. The corresponding expected mechanical power is 0.9 to 1.1 MW. For the most promising variant a preliminary project is described (peak electric power: 0.91 MW, annual electrical energy production: 3.1 GWh). The local geology and hydrogeology are presented. The water collection points, conduits and the power station are described. Technical details on water quantities and energy production are presented. Financial aspects including construction and operating costs are presented and the economic viability of the project is discussed. Environmental aspects are reviewed. Further steps to be taken in the realisation of this hydropower installation are listed.

  12. Financing strategy for Indonesian Nuclear Power Project

    International Nuclear Information System (INIS)

    Subki, I.M.; Arbie, B.; Adiwardojo; Seotrisnanto, A.Y.

    1998-01-01

    In anticipation of the introduction in the early 2000s of a nuclear power plant, the Government of Indonesia (GOI), through the National Atomic Energy Agency (BATAN) , has formulated a Bid Invitation Specification (BIS) in parallel with the completion of the NPP Feasibility Study. This BIS formulation assumed an open international tender for the first unit of the NPP with project financing as a conventional loan. The GOI's recent policy is to minimize government financial support for power development. This paper summarizes a financing strategy for the Indonesian NPP project to make the NPP economically viable, and provides a general discussion on project financing using a conventional approach, Build--Own-Operate (BOO) and a counter-purchase approach. Innovative approaches for financing are still being pursued in order to obtain an optimum solution for investors and owners, to fulfill the Indonesian government's requirements. (author)

  13. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  14. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  15. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  16. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  17. Dispatchable Solar Power Plant Project

    Energy Technology Data Exchange (ETDEWEB)

    Price, Henry [Solar Dynamics LLC, Broomfield, CO (United States)

    2018-01-31

    As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines

  18. An ABC analysis for power generation project

    OpenAIRE

    Batool Hasani; Younos Vakilalroaia

    2013-01-01

    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC m...

  19. Information management for nuclear power stations: project description

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  20. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  1. Comparison of power spectra for tomosynthesis projections and reconstructed images

    International Nuclear Information System (INIS)

    Engstrom, Emma; Reiser, Ingrid; Nishikawa, Robert

    2009-01-01

    Burgess et al. [Med. Phys. 28, 419-437 (2001)] showed that the power spectrum of mammographic breast background follows a power law and that lesion detectability is affected by the power-law exponent β which measures the amount of structure in the background. Following the study of Burgess et al., the authors measured and compared the power-law exponent of mammographic backgrounds in tomosynthesis projections and reconstructed slices to investigate the effect of tomosynthesis imaging on background structure. Our data set consisted of 55 patient cases. For each case, regions of interest (ROIs) were extracted from both projection images and reconstructed slices. The periodogram of each ROI was computed by taking the squared modulus of the Fourier transform of the ROI. The power-law exponent was determined for each periodogram and averaged across all ROIs extracted from all projections or reconstructed slices for each patient data set. For the projections, the mean β averaged across the 55 cases was 3.06 (standard deviation of 0.21), while it was 2.87 (0.24) for the corresponding reconstructions. The difference in β for a given patient between the projection ROIs and the reconstructed ROIs averaged across the 55 cases was 0.194, which was statistically significant (p<0.001). The 95% CI for the difference between the mean value of β for the projections and reconstructions was [0.170, 0.218]. The results are consistent with the observation that the amount of breast structure in the tomosynthesis slice is reduced compared to projection mammography and that this may lead to improved lesion detectability.

  2. Effects of a power and photon energy of incident light on near-field etching properties

    Science.gov (United States)

    Yatsui, T.; Saito, H.; Nishioka, K.; Leuschel, B.; Soppera, O.; Nobusada, K.

    2017-12-01

    We developed a near-field etching technique for realizing an ultra-flat surfaces of various materials and structures. To elucidate the near-field etching properties, we have investigated the effects of power and the photon energy of the incident light. First, we established theoretically that an optical near-field with photon energy lower than the absorption edge of the molecules can induce molecular vibrations. We used nanodiamonds to study the power dependence of the near-field etching properties. From the topological changes of the nanodiamonds, we confirmed the linear-dependence of the etching volume with the incident power. Furthermore, we studied the photon energy dependence using TiO2 nanostriped structures, which revealed that a lower photon energy results in a lower etching rate.

  3. Pilot project wind power - Large scale wind power in northern Sweden; Pilotprojekt vindkraft - Storskalig vindkraft i norra Sverige

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Swedish Energy Agency granted 2009-04-20 Svevind AB financial aid to implement {sup P}ilot project wind power- Large scale wind power in northern Sweden{sup .} The purpose of the aid is to implement pilot sub-projects in wind power, to to increase knowledge for the larger establishments. The Energy Agency said in its decision that the projects Dragaliden and Gabriel Mountain is of 'great importance for future large-scale development of wind power in Sweden'. The special conditions prevailing in the project, forest environment and cold climate, gives the possibility of studies of wind turbines on birds, reindeer herding and hunting and the more technical aspects, such as de-icing and obstacle lighting. The objectives of the project, in addition to the construction and operation of 32 wind turbines, has been to include evaluating the permit process, studying the social effects around the wind power, to study the impact on small game hunting, perform tests of the de-icing system, investigate impacts on reindeer herding and explain the outcome of the project-generated rural funds. Some of the above sub-projects have been completed, which are reported in this report. For the sub-projects still in progress, the report presents the results to date, until the completion.

  4. International power projections and capital requirements

    International Nuclear Information System (INIS)

    Ann, H.

    1989-01-01

    This work is related to the international power projections and capital requirements of all kinds of energy and the share of electricity. It is also related to the so-called greenhouse effect carbon dioxide concentration in atmosphere. (A.C.A.S.)

  5. Sulfur dioxide concentrations near thermoelectric power plant of Rossano Calabro (Italy)

    International Nuclear Information System (INIS)

    Florio, G.

    1991-01-01

    This article presents the results of a one-year atmospheric sulfur dioxide concentration monitoring campaign conducted with the use of five detection stations situated near the 320 MW thermoelectric power plant serving the coastal town of Rossano Calabro (population 50,000). Apart from the analysis of sulfur dioxide concentrations, a meteorological study was carried out based on anemological data. Comparisons were made with reference to the relevant legal standards. It was thus possible to ascertain that air quality near the power station is quite high. Nevertheless, it should be pointed out that, due to the particular local meteorological situation strongly turbulent sea breezes, new detection stations should be opened in this area which may undergo significant industrial development

  6. Sulfur dioxide concentrations near thermoelectric power plant of Rossano Calabro (Italy)

    Energy Technology Data Exchange (ETDEWEB)

    Florio, G. (Calabria Univ., Arcavacata di Rende (Italy). Dipt. di Meccanica)

    This article presents the results of a one-year atmospheric sulfur dioxide concentration monitoring campaign conducted with the use of five detection stations situated near the 320 MW thermoelectric power plant serving the coastal town of Rossano Calabro (population 50,000). Apart from the analysis of sulfur dioxide concentrations, a meteorological study was carried out based on anemological data. Comparisons were made with reference to the relevant legal standards. It was thus possible to ascertain that air quality near the power station is quite high. Nevertheless, it should be pointed out that, due to the particular local meteorological situation strongly turbulent sea breezes, new detection stations should be opened in this area which may undergo significant industrial development.

  7. Assessment of power-plant effects on zooplankton in the near field

    International Nuclear Information System (INIS)

    Polgar, T.T.; Bongers, L.H.; Krainak, G.M.

    1976-01-01

    With the use of a simple entrainment model that takes into account tidal recirculation, mixing, and once-through kill rate, theoretical expressions are derived for ratios of densities of live organisms at the intake of a power plant to densities in the far field. Experimental data on the abundances of dead and live stages of Eurytemora affinis and Acartia tonsa are used to compare to model results. A study of the entrainment of zooplankton near the intake of the Morgantown power plant and a concurrent study of the distribution of zooplankton in the Potomac River provided the biological data. Physical information was derived from extensive hydrographic measurements. Comparing experimental data with model predictions showed that radical depletions occurred in the naupliar stages near the plant site which cannot be accounted for by cooling-system or delayed entrainment mortalities. These near-field changes are attributed to avoidance reactions and to mortalities in the vicinity of the plant

  8. Living near nuclear power plants and thyroid cancer risk: A systematic review and meta-analysis.

    Science.gov (United States)

    Kim, Jaeyoung; Bang, Yejin; Lee, Won Jin

    2016-02-01

    There has been public concern regarding the safety of residing near nuclear power plants, and the extent of risk for thyroid cancer among adults living near nuclear power plants has not been fully explored. In the present study, a systematic review and meta-analysis of epidemiologic studies was conducted to investigate the association between living near nuclear power plants and the risk of thyroid cancer. A comprehensive literature search was performed on studies published up to March 2015 on the association between nuclear power plants and thyroid cancer risk. The summary standardized incidence ratio (SIR), standardized mortality ratio (SMR), and 95% confidence intervals (CIs) were calculated using a random-effect model of meta-analysis. Sensitivity analyses were performed by study quality. Thirteen studies were included in the meta-analysis, covering 36 nuclear power stations in 10 countries. Overall, summary estimates showed no significant increased thyroid cancer incidence or mortality among residents living near nuclear power plants (summary SIR=0.98; 95% CI 0.87-1.11, summary SMR=0.80; 95% CI 0.62-1.04). The pooled estimates did not reveal different patterns of risk by gender, exposure definition, or reference population. However, sensitivity analysis by exposure definition showed that living less than 20 km from nuclear power plants was associated with a significant increase in the risk of thyroid cancer in well-designed studies (summary OR=1.75; 95% CI 1.17-2.64). Our study does not support an association between living near nuclear power plants and risk of thyroid cancer but does support a need for well-designed future studies. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. Near field studies within the SKB 91 Project

    International Nuclear Information System (INIS)

    Widen, H.; Bengtsson, A.; Grundfelt, B.

    1991-06-01

    A number of near field studies was preformed during the early part of the SKB91 project. This report summaries this work and includes: - Simulation of the steady release from the near field with different time for canister penetration. - Simulation of the release from a repository with 5300 canisters with different penetration times for different parts of the canisters due to manufacturing error, glaciations, inner over pressure and corrosion. - Calculation with a numerical model of the transient release of the instantaneously dissolvable species and the effect of different boundary conditions both at the canister/bentonite and the bentonite/rock interface. - Description of the implementation of a resistance network model for the calculation of the steady state transport resistances in the different pathways from the canisters. - Comparison of two analytical models for the calculation of the release of the instantaneously dissolvable species. (au)

  10. Management of difference in a nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2012-01-01

    The Thesis dissertate the application of Management of Difference in a Nuclear Power Project from nuclear safety regulation requirement, selection of a nuclear power plant site, engineering and procurement, construction, operation and maintenance, quality management, schedule management and experience feedback aspects. (author)

  11. Appraisal and financing of electric power projects

    International Nuclear Information System (INIS)

    Sheehan, R.H.

    1975-01-01

    This paper starts with the origin, nature and functions of the World Bank Group, reviews the past lending, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a look at the probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de

  12. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  13. Project designing of Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Krychtalek, Z.; Linek, V.

    1989-01-01

    The geological and seismic parameters are listed of the Temelin nuclear power plant. The division of the site in building zones is described. The main zones consist of the power generation unit zone with the related auxiliary buildings of hot plants and of the auxiliary buildings of the nonactive part with industrial buildings. The important buildings are interconnected with communication and technology bridges. Cooling towers and spray pools and the entrance area are part of the urbanistic design. The architectonic design of the buildings uses standard building elements and materials. The design of the buildings is based on the requirements on their function and on structural load and on the demands of maximal utilization of the type of the reinforced concrete prefab structure system. The structure is made of concrete or steel cells. The project design is based on Soviet projects. The layout is shown of the main power generation units and a section is presented of a 1,000 MW unit. (J.B.). 2 figs

  14. Piloting a community-based micro-hydro power generation project

    International Nuclear Information System (INIS)

    Buenafe, Menandro B.; Eponio, Melchor P.

    1998-01-01

    A community based microhydro power generation project was successfully piloted in Dulao, Malibcong, Abra. The project started with the identification and evaluation of five potential creeks flowing near villages in the Cordillera hinterlands. All the sites showed comparative hydrologic features except for one factor that decided the project's implementation: the willingness of the people to invest by providing their labor- counterpart. On this account, only the residents of Dulao put their full trust in the implementing institutions, the main reason for the project's success. The micro-hydro power project consisted of an earthen diversion canal that conveyed part of the streamflow unto a forebay located above the powerhouse. The forebay was built of riprap and concrete, equipped with a desilting chamber, trashrack, a spillway, and an overflow canal that directed water to the ricefields downstream. A polyethylenevinyl penstock was laid underground along the slope,from the forebay to the powerhouse. The penstock assumed a Y-configuration inside the powerhouse where the two crossflow turbines were separately mounted on each arms. Two butterfly valves were positioned just before each turbine so that flow can be alternately controlled for the two machines. A tailrace drained the discharge from the turbines back to the same creek. Originally, the setup could only operate the 3kw turbine that ran the ricemill by means of a flat belt drive. Upon further hydrologic study, an 8kw crossflow turbine was installed to a drive a 7.5kva, two-pole, single phase alternator. The 8kw turbine can operate under three design flows, namely: 20,40, and 60 liters per second. The turbine-alternator setup was achieved by a pulley and belt drive arrangement. Typically, the AC generator was provided with monitoring instruments like a volt meter, frequency meter, and ampere meter. An electronic load controller (ELC) was observed to effectively protect the alternator from runaway speeds, over

  15. Living near a nuclear power station

    International Nuclear Information System (INIS)

    Marcan, P.; Slovak, K.

    2007-01-01

    The need to expand nuclear power and its advantages are discussed publicly nearly each week. According to politicians and the nuclear lobby investing tens of billions Sk at Mochovce will bring Slovakia the often cited 'independence and energy self-sufficiency'. It will also mean profit for Slovenske elektrarne and the company's shareholders - the state and Italian company, Enel. In addition to the lively discussion on the pros and cons of nuclear energy, TREND was also interested in the living conditions around the concrete and strictly guarded, potentially dangerous plants and in the opinion of the people most affected by Mochovce and Jaslovske Bohunice on expansion of the existing and the building of new nuclear power plants. The construction of nuclear powers stations in these regions was not only about new jobs. The state 'prescribed' iodine pills and did not allow any construction in the region and, in the case of Mochovce, ordered the complete demolition of a village. The only thing that remained from Mochovce village was the church. 'And when it was found that the power plant would not reach it, it was even given a new roof. Former inhabitants, especially the older ones that had problems accepting the evacuation, used to visit it often,' explained Jan Foldy, the head of the local municipality in Kalna nad Hronom. After many years, life in the neighbouring villages is not bad. Their budgets are overflowing and so they can afford to spoil their inhabitants with free cable TV and high standard sport facilities, which should partly compensate for the fact that the people are living so close to a nuclear facility. (authors)

  16. Development of human factors engineering guide for nuclear power project

    International Nuclear Information System (INIS)

    Wu Dangshi; Sheng Jufang

    1997-01-01

    'THE PRACTICAL GUIDE FOR APPLICATION OF HUMAN FACTORS ENGINEERING TO NUCLEAR POWER PROJECT (First Draft, in Chinese)', which was developed under a research program sponsored by National Nuclear Safety Administration (NNSA) is described briefly. It is hoped that more conscious, more systematical and more comprehensive application of Human Factors Engineering to the nuclear power projects from the preliminary feasibility studies up to the commercial operation will benefit the safe, efficient and economical operations of nuclear power plants in China

  17. Power project financing in the People's Republic of China

    International Nuclear Information System (INIS)

    Gomm, R.

    1998-01-01

    The current state of financing and security issues which in the past have constrained the amount of foreign investment and project financing in the electric power market in the Peoples Republic of China (PRC) are reviewed. Past impediments to foreign investment and financing of power projects revolved around the rate of return on investment, the difficulties of obtaining project approvals, conflict of interest issues wherein the Chinese power bureau could act in its interest as a contracted party rather than for the joint venture as an equity investor, and currency convertibility. Recent developments such as the new security law, the new electricity law, and new project financing regulations represent major improvements, but foreign investment and financing is still much less than originally anticipated, the potential of the PRC power market for foreign investments notwithstanding. (For example, in 1997, 13,500 MW of new generation capacity was added to the Chinese grid system. This increased the total installed capacity to 250,000 MW, making China the second largest installed capacity in the world.) Recent trends in the market and the likely future of foreign investment in the PRC are also discussed, the conclusion being that although the size of the IPP and project finance market in China is probably smaller than originally hoped, a sufficient proportion of new generation capacity has been allocated to foreign investors to ensure a steady stream of investment opportunities

  18. The Philippine nuclear power project, its past, present and future

    International Nuclear Information System (INIS)

    Jovellanos, J.U.

    1993-01-01

    The article discussed the historical background of the nuclear power plants; how it operates; the government opinion on the operation of the nuclear power plant; the application of power resources to industry; the implementation of PNPP-1 particularly the economic aspects of energy in the near future. (IMA)

  19. Qinshan Phase III (CANDU) nuclear power project quality assurance

    International Nuclear Information System (INIS)

    Wang Lingen; Du Jinxiang

    2001-01-01

    The completion and implementation of quality assurance system of Qinshan Phase III (CANDU) nuclear power project are presented. Some comments and understanding with consideration of the project characteristics are put forward

  20. Topical and working papers on nuclear power capacity projections

    International Nuclear Information System (INIS)

    As a part of the overall work programme of WG. 1, Sub-Group 1A/2A was formed jointly with WG. 2 and given the responsibility for estimating the growth of nuclear power up to the year 2025 and the associated demands for nuclear fuels, heavy water, enrichment and other fuel cycle services. In carrying out the first part of its task, the estimation of nuclear power capacity growth, sub-Group 1A/2A prepared 6 working papers which contain the following information: A critique of recent world energy demand forecasts; world energy demand and installed capacity to the year 2025; nuclear power growth projections 1977-2000 for developing countries; long range world nuclear power growth projections; INFCE forecasts of nuclear generating capacity 1985-2025

  1. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  2. Analysis of debt leveraging in private power projects

    International Nuclear Information System (INIS)

    Kahn, E.P.; Meal, M.; Doerrer, S.; Morse, S.

    1992-08-01

    As private power (non-utility generation) has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital, and that this leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not home by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs

  3. Analysis of debt leveraging in private power projects

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P. (Lawrence Berkeley Lab., CA (United States)); Meal, M.; Doerrer, S.; Morse, S. (Morse, Richard, Weisenmiller Associates, Inc., Oakland, CA (United States))

    1992-08-01

    As private power has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital. This leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not borne by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs.

  4. Concentrating Solar Power Projects - Nevada Solar One | Concentrating Solar

    Science.gov (United States)

    Power | NREL Nevada Solar One This page provides information on Nevada Solar One, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Acciona Energy's Nevada Solar One is the third largest CSP plant in the world and the first plant

  5. HSAPS market analysis project

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-15

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  6. HSAPS market analysis project

    International Nuclear Information System (INIS)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-01

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  7. A hypothesis to explain childhood cancers near nuclear power plants

    International Nuclear Information System (INIS)

    Fairlie, Ian

    2014-01-01

    Over 60 epidemiological studies world-wide have examined cancer incidences in children near nuclear power plants (NPPs): most of them indicate leukemia increases. These include the 2008 KiKK study commissioned by the German Government which found relative risks (RR) of 1.6 in total cancers and 2.2 in leukemias among infants living within 5 km of all German NPPs. The KiKK study has retriggered the debate as to the cause(s) of these increased cancers. A suggested hypothesis is that the increased cancers arise from radiation exposures to pregnant women near NPPs. However any theory has to account for the >10,000 fold discrepancy between official dose estimates from NPP emissions and observed increased risks. An explanation may be that doses from spikes in NPP radionuclide emissions are significantly larger than those estimated by official models which are diluted through the use of annual averages. In addition, risks to embryos/fetuses are greater than those to adults and haematopoietic tissues appear more radiosensitive in embryos/fetuses than in newborn babies. The product of possible increased doses and possible increased risks per dose may provide an explanation. - Highlights: • Over 60 studies worldwide on increased cancers near nuclear power plants (NPPs). • German government KiKK study provides very strong evidence. • Hypothesis proposes cancers arise in pregnant women near NPPs. • Nuclide spikes during refuelling could result in increased exposures. • Explanation offered for discrepancy between small dose estimates and large risks

  8. Wind for Schools: A Wind Powering America Project

    Science.gov (United States)

    US Department of Energy, 2007

    2007-01-01

    The U.S. Department of Energy's (DOE's) Wind Powering America program (based at the National Renewable Energy Laboratory) sponsors the Wind for Schools Project to raise awareness in rural America about the benefits of wind energy while simultaneously educating college seniors regarding wind energy applications. The three primary project goals of…

  9. Fiscal 1999 research result report on energy and environment technology demonstration research support project (International joint demonstration research project). Japan- Russia joint demonstration research on large-capacity long- distant DC power transmission technology; 1999 nendo daiyoryo denryoku no chokyori chokuryu soden gijutsu ni kansuru Russia kenkyu kikan tono kyodo jissho kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Under the assumption of a large-capacity DC power transmission model project in the Far East and Siberia districts, technical study was made on the basic design of the project, considering selection of concrete power generation and consumption sites and power transmission routes, power transmission/transformation equipment, cables, and environmental impact. Study was also made on its applicability to similar projects in Japan. The model project aims at integration of Eastern Integrated Power System in the Far East and Russian Unified Power System, and development of abundant undeveloped hydraulic and tidal power generation in the Far East. The study result showed that (1) construction of the high-voltage DC power transmission (HVDC) system of model project class voltage and capacity in Eastern Siberia is possible technically enough, (2) the total construction cost of the model project scheduled to be put into operation in 2025 amounts to nearly $4.7 billion, and (3) the model project is environment-friendly without any CO{sub 2} gas emission because of hydraulic and tidal power generation. (NEDO)

  10. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  11. Simulation-based valuation of project finance investments. Crucial aspects of power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Pietz, Matthaeus

    2010-12-15

    The liberalization of electricity markets transformed a regulated and stable market to a market with former unknown price volatility. This results in a high uncertainty which is mainly due to the, from an economic point of view, lack of storability of the commodity electricity. Thus investments in power plants are highly risky. This dissertation analyzes crucial aspects within the valuation of a power plant financed via project finance, a popular financing method for projects with high capital requirements. Starting with the development of a valuation model based on stochastic modelling of the future cash flows the focus of the analysis is on the impact of model complexity and electricity prices. (orig.)

  12. New design algorithm and reliability testing of solar powered near ...

    African Journals Online (AJOL)

    New design algorithm and reliability testing of solar powered near-space flight vehicle for defense and security. ... To overcome this problem, we propose a pseudo-satellite system where telecommunication devices are carried on a perpetually flying solar aircraft cruising at stratospheric altitude. Our aircraft will combine ...

  13. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  14. The Ocean State Power Project

    International Nuclear Information System (INIS)

    Makowski, J.

    1987-01-01

    Ocean State Power is an independent partnership in the form of utility companies and private developers who have joined forces to build a gas-fired, combined cycle generating plant in Burrillville, Rhode Island. The initial capacity of the plant is expected to be approximately 250 MW, with a provision to double the size. Unit I will be on-line 2989/2990 with unit II shortly thereafter. The OSP equity group includes TransCanada PipeLines, Easter Utilities Associates, New England Electric System, Newport Electric and J. Makowski Associates. The author describes the project's major features and turns to a brief status report on the contracts and licenses. Ocean State Power came about because of; the rapid growth in demand for capacity in new England; the availability of a long-term supply of natural gas from Canada which has recently revised export policies and the inherent efficiency and reliability of combined cycle power generation

  15. Siting and early-stage project management of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Kai; Li Guojin

    2013-01-01

    In this paper, difficulties and challenges facing in siting of nuclear power plant after Fukushima nuclear accident is introduced. The key points for siting are analyzed. The site characteristics related to nuclear safety and the evaluated methods are discussed. From project management perspective, main procedures and key points for the early-stage of a nuclear power project are described. (authors)

  16. Study on the maturity model of nuclear power project management in China

    International Nuclear Information System (INIS)

    Chen Changbing; Li Huiqiang; Zheng Yanguo

    2009-01-01

    Based on the general project management maturity model, this paper discussed the establishment of nuclear power engineering project management maturity model in China, and proposed a basic framework in order to provide a way for improving and evaluating the ability of nuclear power project management in China. (authors)

  17. Virtual Mockup test based on computational science and engineering. Near future technology projected by JSPS-RFTFADVENTURE project

    International Nuclear Information System (INIS)

    Yoshimura, Shinobu

    2001-01-01

    The ADVENTURE project began on August, 1997, as a project in the computational science' field of JSPS-RFTFADVENTURE project, and is progressed as five year project. In this project, by using versatile parallel computer environment such as PC cluster, super parallel computer, and so on , to solve an arbitrary shape of actual dynamical equation by using 10 to 100 million freedom class mode under maintaining a general use analytical capacity agreeable with present general use computational mechanics system, further development of a large-scale parallel computational mechanics system (ADVENTURE system) capable of carrying out an optimization design on shapes, physical properties, loading conditions, and so on is performed. Here was scoped, after outlining on background of R and D on ADVENTURE system and its features, on near future virtual mockup test forecast from it. (G.K.)

  18. Measurement of incident sound power using near field acoustic holography

    DEFF Research Database (Denmark)

    Jacobsen, Finn; Tiana Roig, Elisabet

    2009-01-01

    ; and it has always been regarded as impossible to measure the sound power that is incident on a wall directly. This paper examines a new method of determining this quantity from sound pressure measurements at positions on the wall using ‘statistically optimised near field acoustic holography’ (SONAH...

  19. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  20. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  1. Financing Nuclear Power Plant Projects. A New Paradigm?

    International Nuclear Information System (INIS)

    Pehuet Lucet, Fabienne

    2015-05-01

    There are currently 435 operable nuclear power reactors around the world, with a further 71 under construction. Two main proven financing models were applied to nuclear plants in the past: the national model, and the corporate model. The historical model of financing is the national model. It allowed for the most efficient risk allocation model in then-regulated national electricity markets: government or state-owned utilities with government guarantee assumed the risks of building nuclear power plants locally. The national model has proven to be efficient in France, Russia and the USA where it was modified to support private business initiatives. It was then replicated in Japan, Korea and China where significant nuclear programs were developed. In the corporate business model, the owner of the plant assumes most of the risk, but various schemes are used to mitigate the owner's risk by transmitting large areas of risks to others: vendors for construction risk as in Finland, government through loans guarantees etc. As projects became international, a set of common principles were approved by OECD countries concerning financing and the role of Export Credit Agencies. The objective was to provide competition rules whereby exporters compete on the basis of the price and quality of their products rather than the financial terms provided. Various combinations of these models were and still are implemented. Pure Project Finance was not implemented for nuclear power plants, but the model nurtures reflections about new financing models. The context in which nuclear power projects are now decided and financed changed drastically: it is a new paradigm. Risk allocation and financial conditions are at the forefront of competition to win new nuclear projects' tenders insofar as reducing uncertainties is a decisive competition edge. In a context of electricity market deregulation and high construction risks, investors and lenders require more and more securities to

  2. Employment impacts of CDM projects in China's power sector

    International Nuclear Information System (INIS)

    Wang, Can; Zhang, Weishi; Cai, Wenjia; Xie, Xi

    2013-01-01

    There are continuous debates around the question of whether CDM really contributes to sustainable development (SD) in host countries. Employment impact is an essential indicator of SD. Based on an input-out approach this research builds a quantitative assessment model to evaluate the employment impacts of CDM. Both direct and indirect jobs creation and job losses of CDM projects in the power sector registered by the end of 2011 are calculated by project types and power grids where the project is located. Results of this study show that, although the above mentioned CDM projects causes about 99,000 net direct job losses, they also create about 3.08 million indirect jobs, resulting in the gross employment of CDM to be about 2.98 million. Thereof, hydro projects induce both direct and indirect job losses, which comes to approximately 0.89 million. Solar projects have the most potential since they own the highest indirect jobs created by one GWh generation, about 104 jobs/GWh. - Highlights: • An input–output model was built for assessment of CDM projects' employment impact; • CDM projects create direct and indirect jobs while cause some losses in short. • Significant indirect job gains of CDM projects were found; • Solar projects cause 104 jobs/GWh in average, ranking as the highest contributor

  3. WindNet: Improving the impact assessment of wind power projects

    Directory of Open Access Journals (Sweden)

    Christopher R. Jones

    2014-12-01

    Full Text Available Growing international demand for renewable energy has led to rapid growth in the wind power sector and wind farms are becoming an increasingly common feature of landscapes and seascapes in many countries. However, as the most appropriate locations within established markets are taken up, and as wind power penetrates new markets, there is an increasing likelihood that proposed projects will encroach on sensitive landscapes and residential areas. This will present challenges for the industry, particularly due to the impact that public opinion can have upon the outcomes of planning decisions about specific projects. This article introduces the four key dimensions of the WindNet programme, which are helping to elucidate some of the socio-technical debates that will likely shape the future of the wind power sector. The article outlines studies investigating (1 public responses to cumulative landscape and visual impacts, (2 the auditory impact of wind power projects on human health, (3 the science of wind farm design and its implications for planning, and (4 the relevance of the democratic deficit explanation of the so-called "social gap" in wind farm siting. The outcomes of the research being conducted by WindNet stand to help reduce uncertainty within the planning process and assist in providing a more comprehensive and fairer assessment of the possible impacts associated with wind power project development.

  4. Technical management of difference in CEPR nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2014-01-01

    The Thesis dissertate the application of technical management of difference in CEPR Nuclear Power Project from EPR technical bases, condition of a nuclear power plant site, engineering and procurement, construction, quality management, schedule management and experience feedback aspects. (author)

  5. Feasibility study of Pridneprovskaya Thermal Power Plant reconstruction project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With objectives of saving energy and reducing greenhouse gas emission at the Pridneprovskaya power plant in Ukraine, a scrap and build project has been discussed. This project will abolish the unit No.12 among the eight units in the existing coal burning power generation facilities, and install a natural gas burning combined cycle plant comprising of three units each with an output of 100 MW. The new plant facilities will consist of gas turbines, steam turbines, HRSG and auxiliary devices, and an air-cooled synchronous power generator with a capacity of 119 MVA. Use of natural gas as fuel reduces generation of soot, sulfur oxides, nitrogen oxides, and CO. In addition, the hot effluent and waste liquor effluent will decrease from those at the present plant. The required fund will be 30,107 million yen. The energy saving effect of this project is reduction of about 7.5 million tons of crude oil equivalent as a total in 40 years. The greenhouse effect gas will decrease by about 39 million tons as a total in 40 years. The profitability estimation calls for the number of investment recovery year of 16 years, and internal profit rate of 7.32%, wherein the implementation of the project cannot be expected as a project to be carried out by private funds. (NEDO)

  6. Project organization for automating an industrial power plant

    International Nuclear Information System (INIS)

    Williams, D.R.; McCowen, R.R.

    1988-01-01

    This paper reports on the controls for three boilers and three turbine generators at the power plant at the John Deere Waterloo Works that have been retrofit with a microprocessor based monitoring, control, and optimization system. The factors driving the project in the 15 mW, 500,000 lb/hr, 35 year old plant were reduced electricity costs due to peak shaving, energy conservation, labor savings, reduced maintenance costs and improved reliability. A turnkey design/build arrangement was sought after a preliminary study indicated an attractive return on investment Control system vendors and design/build contractors were evaluated using a group decision making method. A design/build contractor was chosen to do an in-depth study and write specifications for the control system were negotiated with the contractor The project was managed by the Power Plant and Energy Management Department, rather than by the staff department normally responsible for capital projects

  7. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  8. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  9. Photovoltaic (PV) Pricing Trends: Historical, Recent, and Near-Term Projections

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, D.; Barbose, G.; Margolis, R.; Wiser, R.; Darghouth, N.; Goodrich, A.

    2012-11-01

    This report helps to clarify the confusion surrounding different estimates of system pricing by distinguishing between past, current, and near-term projected estimates. It also discusses the different methodologies and factors that impact the estimated price of a PV system, such as system size, location, technology, and reporting methods.These factors, including timing, can have a significant impact on system pricing.

  10. More child leukemia near nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    2012-01-01

    A French study shows that there are more cases of child leukemia near nuclear power plants but the statistics is low: only 14 cases detected. The same study shows that the excess is not due to the releases of gaseous effluents from the plant, there is no relationship between the excess and a particular type of plant or even a particular plant. Some experts suggest that it might be the movement and intermingling of populations in the plant area that ease the propagation of infectious agents involved in child acute leukemia. A similar result was obtained in Germany a few years ago. (A.C.)

  11. Implementing national nuclear safety plan at the preliminary stage of nuclear power project development

    International Nuclear Information System (INIS)

    Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang

    2014-01-01

    This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)

  12. Solar photovoltaic projects in the mainstream power market

    CERN Document Server

    Wolfe, Philip

    2012-01-01

    Develop large-scale solar photovoltaic projects with this book, to feed power into a grid. Contains case studies of the Waldpolenz Energy Park, Germany, Lopburi Solar Plant in Thailand and what will be the world's largest PV plant, the Topaz Solar Farm in California. Also included are interviews from leading figures in the PV industry.Contents cover:planning and structuring projectssiting, planning and connection issuesbuilding and operating projectstechnology basicseconomies of PVhistory and business of PVfinancing and regulationtechnical aspects of system design.Supported by figures and photographs, this is for anyone wanting to master the commercial, professional, financial, engineering or political aspects of developing mega-watt solar PV projects in a mainstream power market.

  13. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  14. Bulk material management mode of general contractors in nuclear power project

    International Nuclear Information System (INIS)

    Zhang Jinyong; Zhao Xiaobo

    2011-01-01

    The paper introduces the characteristics of bulk material management mode in construction project, and the advantages and disadvantages of bulk material management mode of general contractors in nuclear power project. In combination with the bulk material management mode of China Nuclear Power Engineering Co., Ltd, some improvement measures have been put forward as well. (authors)

  15. Impact of financial institution environmental guidelines on international power generation projects

    International Nuclear Information System (INIS)

    Macak, J.J. III; Schott, G.A.

    1995-01-01

    Where financing is concerned, two major players for US based international power projects are The World Bank and the Export-Import Bank of the US (Ex-Im Bank). The concern for environmental protection is a global issue, yet many countries still have no enforceable environmental regulations for power generation facilities. In the past, many projects were developed with little or no environmental controls. However, designing a power generation project to meet The World Bank environmental guidelines is now generally regarded as standard practice for independent power projects in the developing world (Price et al, 1994). The World Bank standards are mandatory for projects financed by The World Bank, through the International Finance Corporation (IFC), or associated programs like the Expanded Cofinancing Program of the International Bank for Reconstruction and Development (IBRD). The Ex-Im Bank has recently established new environmental procedures and guidelines that went into effect on February 1, 1995. In order to avoid a competitive disadvantage for US exporters and still provide a means for global environmental protection, Ex-Im Bank has taken a leadership role in encouraging the adoption of common environmental procedures and standards by leading export credit agencies around the world. Until such procedures are established, Ex-Im Bank is seeking to establish common lines in specific cases with the Organization for Economic Cooperation and Development (OECD) on environmental standards for appropriate projects (Ex-Im, 1994)

  16. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  17. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  18. Sustainability Evaluation of Power Grid Construction Projects Using Improved TOPSIS and Least Square Support Vector Machine with Modified Fly Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available The electric power industry is of great significance in promoting social and economic development and improving people’s living standards. Power grid construction is a necessary part of infrastructure construction, whose sustainability plays an important role in economic development, environmental protection and social progress. In order to effectively evaluate the sustainability of power grid construction projects, in this paper, we first identified 17 criteria from four dimensions including economy, technology, society and environment to establish the evaluation criteria system. After that, the grey incidence analysis was used to modify the traditional Technique for Order Preference by Similarity to an Ideal Solution (TOPSIS, which made it possible to evaluate the sustainability of electric power construction projects based on visual angle of similarity and nearness. Then, in order to simplify the procedure of experts scoring and computation, on the basis of evaluation results of the improved TOPSIS, the model using Modified Fly Optimization Algorithm (MFOA to optimize the Least Square Support Vector Machine (LSSVM was established. Finally, a numerical example was given to demonstrate the effectiveness of the proposed model.

  19. Engineering for new-built nuclear power plant projects

    International Nuclear Information System (INIS)

    Gonzalez Lopez, A.

    2012-01-01

    This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)

  20. Investigation of Improved Methods in Power Transfer Efficiency for Radiating Near-Field Wireless Power Transfer

    Directory of Open Access Journals (Sweden)

    Hesheng Cheng

    2016-01-01

    Full Text Available A metamaterial-inspired efficient electrically small antenna is proposed, firstly. And then several improving power transfer efficiency (PTE methods for wireless power transfer (WPT systems composed of the proposed antenna in the radiating near-field region are investigated. Method one is using a proposed antenna as a power retriever. This WPT system consisted of three proposed antennas: a transmitter, a receiver, and a retriever. The system is fed by only one power source. At a fixed distance from receiver to transmitter, the distance between the transmitter and the retriever is turned to maximize power transfer from the transmitter to the receiver. Method two is using two proposed antennas as transmitters and one antenna as receiver. The receiver is placed between the two transmitters. In this system, two power sources are used to feed the two transmitters, respectively. By adjusting the phase difference between the two feeding sources, the maximum PTE can be obtained at the optimal phase difference. Using the same configuration as method two, method three, where the maximum PTE can be increased by regulating the voltage (or power ratio of the two feeding sources, is proposed. In addition, we combine the proposed methods to construct another two schemes, which improve the PTE at different extent than classical WPT system.

  1. Power project finance outside the U.S.: S and P's rating perspective

    International Nuclear Information System (INIS)

    Chew, William

    1994-01-01

    The growing prevalence of capital market debt financing for power projects outside the U.S. highlights the importance of understanding the risks this type of project poses, both for sponsors and potential investors. Based on its initial review of non-U.S. projects, S and P believes the stronger among them clearly have the potential to achieve ratings equal to or higher than those of U.S. projects. Nevertheless, sponsors still will need to address some of the risks such projects entail. S and P has established criteria that apply to power projects in all markets; however, it also has identified additional risks for projects outside the U.S. that should be addressed. (author)

  2. DETERMINANTS AFFECTING THE SUCCESS OF DISTRIBUTION GRID PROJECTS IN BINH THUAN POWER COMPANY, VIETNAM

    OpenAIRE

    Pham Van Tai* & Le Duc Thu

    2017-01-01

    The research identified the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company, clarify the mutual relationship between the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company and recommended and rated the solution to enhance the success of the distribution grid project in Binh Thuan Power Company. The research had found fours critical factors: External factors of project, Controlling and coordina...

  3. Initiating a nuclear power project - client's viewpoint

    International Nuclear Information System (INIS)

    Rieh, C.H.

    1985-01-01

    Based upon our experience in Korea, for any country that wants to effectively introduce nuclear plants, the authors recommend the following preparation for accepting the advanced nuclear technology prior to its implementation: training personnel, organizing domestic industries for the technology transfer, and establishing laws, regulations and licensing procedures related to nuclear development. Technical self-sufficiency in nuclear power plant construction and operation must be achieved step by step under a long term master plan. Localization, or internal self-sufficiency, is enhanced by repetitive construction of the same reactor type using a non-turnkey construction method. The project owner should, most of all, improve his management capability for the success of the project along with economic effectiveness. International cooperation among the developing countries who are introducing or planning to introduce nuclear power plant, is expected to play an important role in resolving unique problems which may commonly exist in their nuclear program. In this regard, Korea is prepared to share its accumulated experiences with other developing countries

  4. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  5. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  6. Beam alignment based on two-dimensional power spectral density of a near-field image.

    Science.gov (United States)

    Wang, Shenzhen; Yuan, Qiang; Zeng, Fa; Zhang, Xin; Zhao, Junpu; Li, Kehong; Zhang, Xiaolu; Xue, Qiao; Yang, Ying; Dai, Wanjun; Zhou, Wei; Wang, Yuanchen; Zheng, Kuixing; Su, Jingqin; Hu, Dongxia; Zhu, Qihua

    2017-10-30

    Beam alignment is crucial to high-power laser facilities and is used to adjust the laser beams quickly and accurately to meet stringent requirements of pointing and centering. In this paper, a novel alignment method is presented, which employs data processing of the two-dimensional power spectral density (2D-PSD) for a near-field image and resolves the beam pointing error relative to the spatial filter pinhole directly. Combining this with a near-field fiducial mark, the operation of beam alignment is achieved. It is experimentally demonstrated that this scheme realizes a far-field alignment precision of approximately 3% of the pinhole size. This scheme adopts only one near-field camera to construct the alignment system, which provides a simple, efficient, and low-cost way to align lasers.

  7. Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process

    International Nuclear Information System (INIS)

    Choi, Sun Woo; Roh, Myung Sub

    2013-01-01

    This paper proposes factors influencing the success of BOT nuclear power projects and their weighting method using Analytic Hierarchy Process (AHP) to find the optimal country which developer intends to develop. To summarize, this analytic method enable the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion by minimizing the opportunity cost. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the targeted country. Although the performance of this study is insufficient due to the limitation of time, small sampling and security of materials, it still has the possibility to improve the analytic model more systematically through further study with more data. Developing Build-Own(or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of targeted countries. Moreover, the nuclear power project in most case is practically implemented by Government to Government cooperation, so the key concern for such nuclear power project would be naturally focused on the country situation rather than project viability at planning stage. In this regard, it requires the evaluation of targeted countries before involving the project, comprehensive and proper decision making for complex judgment factors, and efficient integration of expert's opinions, etc. Therefore, prioritizing and evaluating the feasibility of country for identification of optimal project region is very meaningful study

  8. Ownership options, financing structures, and regulatory considerations affecting independent power production projects

    International Nuclear Information System (INIS)

    Knapp, G.M.

    1990-01-01

    In this paper is a framework for analysis of the legal, financing, and policy differences between independent power production projects (IPPs) and projects with qualifying facility status (QFs) under the Public Utility Regulatory Policies Act (PURPA). At a basic level, there is no fundamental difference in types of ownership and financing structures available to IPPs and QFS. The key consideration, though, is the regulatory and legal implications to project participants. Significant issues arise for equity participants, lenders, developers, and project operators that are considering IPP projects. Of course, many of these same issues apply to certain types of QF projects that are not fully exempt from the Public Utility Holding Company Act (PUHCA) and the Federal Power Act (FPA)

  9. Near-field characterization of plasmonic waveguides

    DEFF Research Database (Denmark)

    Zenin, Volodymyr

    2014-01-01

    simply by changing geometric parameters of the waveguide, keeping in mind the trade-off between confinement and propagation losses. A broad variety of plasmonic waveguides and waveguide components, including antennas for coupling the light in/out of the waveguide, requires correspondent characterization...... capabilities, especially on experimental side. The most straight-forward and powerful technique for such purpose is scanning near-field optical microscopy, which allows to probe and map near-field distribution and therefore becomes the main tool in this project. The detailed description of the used setups...

  10. Tecnatom support to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, A. B.

    2009-10-01

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  11. Water and power for the desert -- Energy solutions for the Near and Middle East

    Energy Technology Data Exchange (ETDEWEB)

    Siersdorfer, D.

    2007-07-01

    2007 will mark a unique milestone in human history: for the first time ever, more people on earth will live and work in cities than in rural areas. Moreover, only four of the twenty biggest megacities with populations over 10 million will be in industrial nations; the others will be in threshold and developing countries. Accelerating urbanization and economic growth will fuel a massive demand for adequate infrastructures - such as power and water supplies. Reliable and economical supply of power and water to populations in regions of harsh environments, e.g. in the Near and Middle East, ensures basic survival rather than merely providing for a pleasant life. Economical supply of power and water for desert regions requires a wide mix of reliable technologies already available today and new technologies under development for future needs. Siemens Power Generation's Energy Solution Division, having proven its responsiveness in the past by playing a vital role in the development of the Near and Middle East, will continue to provide answers in future for meeting power and water demand within the regionally specific environment. (auth)

  12. Massive Niagara Falls power generation project uses unique concrete locking system

    Energy Technology Data Exchange (ETDEWEB)

    Polski, A. [Con Cast Pipe, Niagara Falls, ON (Canada)

    2006-09-15

    A 512 metre long accelerating wall and a 360 metre-long approach wall in the Niagara River are being built using a novel locking system to withstand the forces of nature. The walls have been designed to direct continuous flow to a new diversion tunnel below the City of Niagara Falls, Ontario. The walls are made of a single row of pre-cast concrete boxes that lock together in a special configuration to prevent movement from extreme load combinations in the Niagara River. The system was designed as part of a larger project to increase the power generating capabilities of the Sir Adam Beck 2 power generation station. Water channelled into the new tunnel will provide an estimated additional 1.6 terawatt-hours of renewable electricity annually and expand capacity at the station by about 15 per cent. The pre-cast reinforced concrete box design was chosen for the walls as it allowed fast and simple assembly of the structures. The basic structural system for each box is 4 vertical panels that form an open rectangular wall. The boxes are filled with clean rock fragments that are uniformly graded. Once the boxes are installed, cast-in-place concrete slabs will be poured to a depth of approximately 600 mm on top of the wall to cap the entire structure. The value of the design-build contract for the Niagara project is nearly $600 million out of an estimated $985 million budget. Commonly used for the design of culverts, the concrete box technology holds promise for applications including the stabilization of shorelines and the construction of small dams. 3 figs.

  13. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  14. Educational project for the nuclear power and nuclear waste public acceptance fostering

    International Nuclear Information System (INIS)

    Constantin, M.; Diaconu, Daniela

    2005-01-01

    Full text: Until now, public acceptance of nuclear power in Romania can be assessed as good. The main motivations could be: the primacy effect of the information, the poverty, the absence of the interest, the relative low informing level. However we expect important changes in the near future: more active NGOs with anti-nuclear opinion, the public's awareness will be more important, serious opposition against the continuation of the nuclear development may appear followed by a reformulation of the Romanian ecologists ideas. The problem of radioactive nuclear wastes (RNW) is the most sensitive and, related to the public opinion, we expect it will become crucial in 10-15 years. The main assumption of our project is that children who are now in schools will be tomorrow's decision makers on 'nuclear energy and RNW. Thus, we intend to prepare the young generation for the future participation in the decision making process related to RNW. The paper shows the main ideas (initial conditions obtained by actual knowledge level measurements, constraints, methods, information contents, evaluation methods and produced outputs) of the educational proposed programme. The work is part of the Romanian contribution to COWAM FP6 project. (authors)

  15. Potential of wind power projects under the Clean Development Mechanism in India

    Directory of Open Access Journals (Sweden)

    Michaelowa Axel

    2007-07-01

    Full Text Available Abstract Background So far, the cumulative installed capacity of wind power projects in India is far below their gross potential (≤ 15% despite very high level of policy support, tax benefits, long term financing schemes etc., for more than 10 years etc. One of the major barriers is the high costs of investments in these systems. The Clean Development Mechanism (CDM of the Kyoto Protocol provides industrialized countries with an incentive to invest in emission reduction projects in developing countries to achieve a reduction in CO2 emissions at lowest cost that also promotes sustainable development in the host country. Wind power projects could be of interest under the CDM because they directly displace greenhouse gas emissions while contributing to sustainable rural development, if developed correctly. Results Our estimates indicate that there is a vast theoretical potential of CO2 mitigation by the use of wind energy in India. The annual potential Certified Emissions Reductions (CERs of wind power projects in India could theoretically reach 86 million. Under more realistic assumptions about diffusion of wind power projects based on past experiences with the government-run programmes, annual CER volumes by 2012 could reach 41 to 67 million and 78 to 83 million by 2020. Conclusion The projections based on the past diffusion trend indicate that in India, even with highly favorable assumptions, the dissemination of wind power projects is not likely to reach its maximum estimated potential in another 15 years. CDM could help to achieve the maximum utilization potential more rapidly as compared to the current diffusion trend if supportive policies are introduced.

  16. Natural radionuclides near a coal-fired power station

    International Nuclear Information System (INIS)

    Smith-Briggs, J.L.

    1984-01-01

    A previous assessment of the radiological consequences of the emission of natural radionuclides from coal-fired power stations had indicated that 210 Pb was the main contributor to the maximum individual dose. This dose arose from the consumption of foodstuffs particularly cattle liver contaminated by deposited fly ash. Uncertainty surrounded some of the factors used in the assessment, and a limited environmental monitoring programme was recommended to improve it. An experiment has been performed to measure the specific activities of 210 Pb and 210 Po in livers from cattle that had grazed in a field near Didcot power station. Livers from cattle in the Cotswold region have been measured for comparison. The specific activities of 210 Pb and 210 Po in soil and grass samples from both areas have also been measured at three-monthly intervals over a year. No statistically significant increases were observed in the 210 Pb and 210 Po levels in liver, soil or grass samples which could be attributed to the operation of the power station. Transfer coefficients for 210 Pb from forage to liver were about two orders of magnitude less than that used in the original assessment, and the transfer coefficients for 210 Po about a factor a two less. (orig.)

  17. Practice and innovation on safety management of Haiyang Nuclear Power Project

    International Nuclear Information System (INIS)

    Wei Guohu

    2011-01-01

    From the perspective of owner, this article has introduced the safety management model and practice of Haiyang Nuclear Power Project, one of AP1000 Self-reliance Program supporting projects of China. And the article has summarized characteristics of the safety management of Haiyang Project for reference and communication with nuclear or other projects. (author)

  18. Age, Amplitude of Accommodation and Near Addition Power of Adult ...

    African Journals Online (AJOL)

    When an individual changes fixa on from a distance to a near fixa on target, the op cal system of the eye has the ability to increase its focusing power. This enables the eye to bring the image of the object to a clear focus on the re na. This ability is referred to as accommoda on1 - 3 and the maximum amount of ...

  19. Minnesota Agri-Power Project. Quarterly report, January--March, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Wilbur, D.

    1998-05-01

    The Minnesota Valley Alfalfa Producers propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota industrial park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project utilizes air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. This progress report describes feedstock testing, feedstock supply system, performance guarantees, sales contracts, environmental permits, education, environment, economy, and project coordination and control.

  20. Nuclear Power Project in Thailand

    International Nuclear Information System (INIS)

    Namwong, Ratanachai

    2011-01-01

    The Electricity Generating Authority of Thailand (EGAT), the main power producer in Thailand, was first interested in nuclear power as an electricity option in 1967 when the electricity demand increased considerably for the first time as a result of the economic and industrial growth. Its viability had been assessed several times during the early seventies in relation to the changing factors. Finally in the late 1970s, the proceeding with nuclear option was suspended for a variety of reasons, for instance, public opposition, economic repercussion and the uncovering of the indigenous petroleum resources. Nonetheless, EGAT continued to maintain a core of nuclear expertise. During 1980s, faced with dwindling indigenous fossil fuel resources and restrictions on the use of further hydro as an energy source, EGAT had essentially reconsidered introducing nuclear power plants to provide a significant fraction to the long term future electricity demand. The studies on feasibility, siting and environmental impacts were conducted. However, the project was never implemented due to economics crisis in 1999 and strong opposition by environmentalists and activists groups. The 1986 Chernobyl disaster was an important cause. After a long dormant period, the nuclear power is now reviewed as one part of the solution for future energy supply in the country. Thailand currently relies on natural gas for 70 percent of its electricity, with the rest coming from oil, coal and hydro-power. One-third of the natural gas consumed in Thailand is imported, mainly from neighbouring Myanmar. According to Power Development Plan (PDP) 2007 rev.2, the total installed electricity capacity will increase from 28,530.3 MW in 2007 to 44,281 MW by the end of plan in 2021. Significantly increasing energy demand, concerns over climate change and dependence on overseas supplies of fossil fuels, all turn out in a favor of nuclear power. Under the current PDP (as revised in 2009), two 1,000- megawatt nuclear

  1. Low Power Near Field Communication Methods for RFID Applications of SIM Cards.

    Science.gov (United States)

    Chen, Yicheng; Zheng, Zhaoxia; Gong, Mingyang; Yu, Fengqi

    2017-04-14

    Power consumption and communication distance have become crucial challenges for SIM card RFID (radio frequency identification) applications. The combination of long distance 2.45 GHz radio frequency (RF) technology and low power 2 kHz near distance communication is a workable scheme. In this paper, an ultra-low frequency 2 kHz near field communication (NFC) method suitable for SIM cards is proposed and verified in silicon. The low frequency transmission model based on electromagnetic induction is discussed. Different transmission modes are introduced and compared, which show that the baseband transmit mode has a better performance. The low-pass filter circuit and programmable gain amplifiers are applied for noise reduction and signal amplitude amplification. Digital-to-analog converters and comparators are used to judge the card approach and departure. A novel differential Manchester decoder is proposed to deal with the internal clock drift in range-controlled communication applications. The chip has been fully implemented in 0.18 µm complementary metal-oxide-semiconductor (CMOS) technology, with a 330 µA work current and a 45 µA idle current. The low frequency chip can be integrated into a radio frequency SIM card for near field RFID applications.

  2. Cancellation of the Kaiseraugst nuclear power plant project

    International Nuclear Information System (INIS)

    Blocher, C.; Schoenenberger, J.; Stucky, G.

    1988-01-01

    The nuclear power plant project at Kaiseraugst has been worked on for over 20 years. In 1985 the Swiss Parliament decided to license the plant. The cost of the work to date is about 1.2 x10 6 Swiss Franks. Continuation of the project is only sensible if it can be realized within a foreseeable space of time. It is probable that the discussions concerning future energy, environment and safety will continue for a long time. If this is clear that the Kaiseraugst project will not be realized during the next five to ten years for social, civic and political reasons. A continuation of the project is not justifiable. Kernkraftwerk Kaiseraugst AG must be adequately compensated. A motion has been presented to Parliament which charges the Government to negotiate with Kernkraftwerk Kaiseraugst AG for cancellation of the project

  3. Power control for wind turbines in weak grids: Project summary

    DEFF Research Database (Denmark)

    Bindner, H.

    1999-01-01

    . The two case studies (Madeira, Portugal and Co. Donegal, Ireland) revealed that sometimes theleast cost and most attractive option is change in the operating strategy of the power system. This allowed that further wind energy can be integrated at competitive cost in the Madeira power system. In Co....... Donegal the options for pumped storage are goodcombined with good wind resources. Unfortunately the grid is weak. The least cost option for the feeder studied is either grid reinforcement or a power control system based on pumped storage if rather large amounts of wind energy are to be absorbed...... by thepower system. The cost estimates for the two options are in the same range. The current report is a summary of the work done in the project 'Power Control for Wind Turbines in Weak Grids'. The project has been partly funded by EU under contractJOR3-CT95-0067....

  4. Major projects for the use of high power linacs

    International Nuclear Information System (INIS)

    Prome, M.

    1996-01-01

    A review of the major projects for high power linacs is given. The field covers the projects aiming at the transmutation of nuclear waste or the production of tritium, as well as the production of neutrons for hybrid reactors or basic research with neutron sources. The technologies which arc common to all the projects are discussed. Comments are made on the technical difficulties encountered by all the projects, and the special problems of the pulsed linacs are mentioned. Elements for a comparison of normal conducting linacs versus superconducting ones are given. Finally the technical developments being made in various laboratories are reviewed. (author)

  5. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  6. Analysis of critical paths for schedule control of nuclear power projects

    International Nuclear Information System (INIS)

    Shi Liangmin; Ma Limin; Fan Kai

    2005-01-01

    Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310, based on the experiences from Daya Bay project and Ling Ao project. The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test. For NI civil work, the critical path is the main civil work of the reactor building, pre-stressing, handover of rooms for important areas, and key CW-erection interfaces; there are four critical paths for NI erection; For startup, two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test. (authors)

  7. Strategically oriented project management of the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Kemmeter, Sascha; Woempener, Andreas

    2013-01-01

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  8. Childhood leukaemia incidence below the age of 5 years near French nuclear power plants

    International Nuclear Information System (INIS)

    Laurier, D; Hemon, D; Clavel, J

    2008-01-01

    A recent study indicated an excess risk of leukaemia among children under the age of 5 years living in the vicinity of nuclear power plants in Germany. We present results relating to the incidence of childhood leukaemia in the vicinity of nuclear power plants in France for the same age range. These results do not indicate an excess risk of leukaemia in young children living near French nuclear power plants. (note)

  9. Safety Assessment Methodologies and Their Application in Development of Near Surface Waste Disposal Facilities--ASAM Project

    International Nuclear Information System (INIS)

    Batandjieva, B.; Metcalf, P.

    2003-01-01

    Safety of near surface disposal facilities is a primary focus and objective of stakeholders involved in radioactive waste management of low and intermediate level waste and safety assessment is an important tool contributing to the evaluation and demonstration of the overall safety of these facilities. It plays significant role in different stages of development of these facilities (site characterization, design, operation, closure) and especially for those facilities for which safety assessment has not been performed or safety has not been demonstrated yet and the future has not been decided. Safety assessments also create the basis for the safety arguments presented to nuclear regulators, public and other interested parties in respect of the safety of existing facilities, the measures to upgrade existing facilities and development of new facilities. The International Atomic Energy Agency (IAEA) has initiated a number of research coordinated projects in the field of development and improvement of approaches to safety assessment and methodologies for safety assessment of near surface disposal facilities, such as NSARS (Near Surface Radioactive Waste Disposal Safety Assessment Reliability Study) and ISAM (Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities) projects. These projects were very successful and showed that there is a need to promote the consistent application of the safety assessment methodologies and to explore approaches to regulatory review of safety assessments and safety cases in order to make safety related decisions. These objectives have been the basis of the IAEA follow up coordinated research project--ASAM (Application of Safety Assessment Methodologies for Near Surface Disposal Facilities), which will commence in November 2002 and continue for a period of three years

  10. High power cascade diode lasers emitting near 2 μm

    Energy Technology Data Exchange (ETDEWEB)

    Hosoda, Takashi; Feng, Tao; Shterengas, Leon, E-mail: leon.shterengas@stonybrook.edu; Kipshidze, Gela; Belenky, Gregory [State University of New York at Stony Brook, Stony Brook, New York 11794 (United States)

    2016-03-28

    High-power two-stage cascade GaSb-based type-I quantum well diode lasers emitting near 2 μm were designed and fabricated. Coated devices with cavity length of 3 mm generated about 2 W of continuous wave power from 100-μm-wide aperture at the current of 6 A. The power conversion efficiency peaked at 20%. Carrier recycling between quantum well gain stages was realized using band-to-band tunneling in GaSb/AlSb/InAs heterostructure complemented with optimized electron and hole injector regions. Design optimization eliminated parasitic optical absorption and thermionic emission, and included modification of the InAs quantum wells of electron and composition and doping profile of hole injectors. Utilization of the cascade pumping scheme yielded 2 μm lasers with improved output power and efficiency compared to existing state-of-the-art diodes.

  11. The IAEA research project on improvement of safety assessment methodologies for near surface disposal facilities

    International Nuclear Information System (INIS)

    Torres-Vidal, C.; Graham, D.; Batandjieva, B.

    2002-01-01

    The International Atomic Energy Agency (IAEA) Research Coordinated Project on Improvement of Safety Assessment Methodologies for Near Surface Disposal Facilities (ISAM) was launched in November 1997 and it has been underway for three years. The ISAM project was developed to provide a critical evaluation of the approaches and tools used in long-term safety assessment of near surface repositories. It resulted in the development of a harmonised approach and illustrated its application by way of three test cases - vault, borehole and Radon (a particular range of repository designs developed within the former Soviet Union) type repositories. As a consequence, the ISAM project had over 70 active participants and attracted considerable interest involving around 700 experts from 72 Member States. The methodology developed, the test cases, the main lessons learnt and the conclusions have been documented and will be published in the form of an IAEA TECDOC. This paper presents the work of the IAEA on improvement of safety assessment methodologies for near surface waste disposal facilities and the application of these methodologies for different purposes in the individual stages of the repository development. The paper introduces the main objectives, activities and outcome of the ISAM project and summarizes the work performed by the six working groups within the ISAM programme, i.e. Scenario Generation and Justification, Modelling, Confidence Building, Vault, Radon Type Facility and Borehole test cases. (author)

  12. Investigation of axial power gradients near a control rod tip

    Energy Technology Data Exchange (ETDEWEB)

    Loberg, John, E-mail: John.Loberg@fysast.uu.se [Uppsala University, Department of Physics and Astronomy, Division of Applied Nuclear Physics, Box 525, SE-75120 Uppsala (Sweden); Osterlund, Michael, E-mail: Michael.Osterlund@fysast.uu.se [Uppsala University, Department of Physics and Astronomy, Division of Applied Nuclear Physics, Box 525, SE-75120 Uppsala (Sweden); Bejmer, Klaes-Hakan, E-mail: Klaes-Hakan.Bejmer@vattenfall.com [Vattenfall Nuclear Fuel AB, Jaemtlandsgatan 99, 162 60 Vaellingby, Stockholm (Sweden); Blomgren, Jan, E-mail: Jan.Blomgren@vattenfall.com [Vattenfall Nuclear Fuel AB, Jaemtlandsgatan 99, 162 60 Vaellingby, Stockholm (Sweden); Kierkegaard, Jesper, E-mail: Jesper.Kierkegaar@vattenfall.com [Vattenfall Nuclear Fuel AB, Jaemtlandsgatan 99, 162 60 Vaellingby, Stockholm (Sweden)

    2011-07-15

    Highlights: > Pin power gradients near BWR control rod tips have been investigated. > A control rod tip is modeled in MCNP and compared to simplified 2D/3D geometry. > Small nodes increases pin power gradients; standard nodes underestimates gradients. > The MCNP results are validated against axial gamma scan of a controlled fuel pin. - Abstract: Control rod withdrawal in BWRs induces large power steps in the adjacent fuel assemblies. This paper investigates how well a 2D/3D method, e.g., CASMO5/SIMULATE5 computes axial pin power gradients adjacent to an asymmetrical control-rod tip in a BWR. The ability to predict pin power gradients accurately is important for safety considerations whereas large powers steps induced by control rod withdrawal can cause Pellet Cladding Interaction. The computation of axial pin power gradients axially around a control rod tip is a challenging task for any nodal code. On top of that, asymmetrical control rod handles are present in some BWR designs. The lattice code CASMO requires diagonal symmetry of all control rod parts. This introduces an error in computed pin power gradients that has been evaluated by Monte Carlo calculations. The results show that CASMO5/SIMULATE5, despite the asymmetrical control rod handle, is able to predict the axial pin power gradient within 1%/cm for axial nodal sizes of 15-3.68 cm. However, a nodal size of 3.68 cm still causes underestimations of pin power gradients compared with 1 cm nodes. Furthermore, if conventional node sizes are used, {approx}15 cm, pin power gradients can be underestimated by over 50% compared with 1 cm nodes. The detailed axial pin power profiles from MCNP are corroborated by measured gamma scan data on fuel rods irradiated adjacent to control rods.

  13. Investigation of axial power gradients near a control rod tip

    International Nuclear Information System (INIS)

    Loberg, John; Osterlund, Michael; Bejmer, Klaes-Hakan; Blomgren, Jan; Kierkegaard, Jesper

    2011-01-01

    Highlights: → Pin power gradients near BWR control rod tips have been investigated. → A control rod tip is modeled in MCNP and compared to simplified 2D/3D geometry. → Small nodes increases pin power gradients; standard nodes underestimates gradients. → The MCNP results are validated against axial gamma scan of a controlled fuel pin. - Abstract: Control rod withdrawal in BWRs induces large power steps in the adjacent fuel assemblies. This paper investigates how well a 2D/3D method, e.g., CASMO5/SIMULATE5 computes axial pin power gradients adjacent to an asymmetrical control-rod tip in a BWR. The ability to predict pin power gradients accurately is important for safety considerations whereas large powers steps induced by control rod withdrawal can cause Pellet Cladding Interaction. The computation of axial pin power gradients axially around a control rod tip is a challenging task for any nodal code. On top of that, asymmetrical control rod handles are present in some BWR designs. The lattice code CASMO requires diagonal symmetry of all control rod parts. This introduces an error in computed pin power gradients that has been evaluated by Monte Carlo calculations. The results show that CASMO5/SIMULATE5, despite the asymmetrical control rod handle, is able to predict the axial pin power gradient within 1%/cm for axial nodal sizes of 15-3.68 cm. However, a nodal size of 3.68 cm still causes underestimations of pin power gradients compared with 1 cm nodes. Furthermore, if conventional node sizes are used, ∼15 cm, pin power gradients can be underestimated by over 50% compared with 1 cm nodes. The detailed axial pin power profiles from MCNP are corroborated by measured gamma scan data on fuel rods irradiated adjacent to control rods.

  14. Near-maximum-power-point-operation (nMPPO) design of photovoltaic power generation system

    Energy Technology Data Exchange (ETDEWEB)

    Huang, B.J.; Sun, F.S.; Ho, R.W. [Department of Mechanical Engineering, National Taiwan University, Taipei 106, Taiwan (China)

    2006-08-15

    The present study proposes a PV system design, called 'near-maximum power-point-operation' (nMPPO) that can maintain the performance very close to PV system with MPPT (maximum-power-point tracking) but eliminate hardware of the MPPT. The concept of nMPPO is to match the design of battery bank voltage V{sub set} with the MPP (maximum-power point) of the PV module based on an analysis using meteorological data. Three design methods are used in the present study to determine the optimal V{sub set}. The analytical results show that nMPPO is feasible and the optimal V{sub set} falls in the range 13.2-15.0V for MSX60 PV module. The long-term performance simulation shows that the overall nMPPO efficiency {eta}{sub nMPPO} is higher than 94%. Two outdoor field tests were carried out in the present study to verify the design of nMPPO. The test results for a single PV module (60Wp) indicate that the nMPPO efficiency {eta}{sub nMPPO} is mostly higher than 93% at various PV temperature T{sub pv}. Another long-term field test of 1kWp PV array using nMPPO shows that the power generation using nMPPO is almost identical with MPPT at various weather conditions and T{sub pv} variation from 24{sup o}C to 70{sup o}C. (author)

  15. Study on optimized decision-making model of offshore wind power projects investment

    Science.gov (United States)

    Zhao, Tian; Yang, Shangdong; Gao, Guowei; Ma, Li

    2018-02-01

    China’s offshore wind energy is of great potential and plays an important role in promoting China’s energy structure adjustment. However, the current development of offshore wind power in China is inadequate, and is much less developed than that of onshore wind power. On the basis of considering all kinds of risks faced by offshore wind power development, an optimized model of offshore wind power investment decision is established in this paper by proposing the risk-benefit assessment method. To prove the practicability of this method in improving the selection of wind power projects, python programming is used to simulate the investment analysis of a large number of projects. Therefore, the paper is dedicated to provide decision-making support for the sound development of offshore wind power industry.

  16. Purposes and related aspects of the nuclear power plant aging Project

    International Nuclear Information System (INIS)

    Garaud, J.; Reynes, L.; Montardy, A. de

    1989-01-01

    The purposes and some aspects of the nuclear power plant Lifetime project is presented. The work is focused on the study of the aging of the PWR type power plant components. The project consists in two phases. The first one involves: the status reports and the analysis of the lifetime data of the most sensitive units, as well as the applied actions and proposals, the influence of the exploitation modes, the safety and the cost prospectives. The second phase includes: the definition, the contracts, the complementary actions and their achievement, the reasons and the surveyance improvements, the development of the decision supporting means, the summary and the conclusions. The selected units for the project first step and the project of actions, are listed. The first conclusions of the project show that most of the 900 MW PWR reactor components will have about 40 years of service life [fr

  17. High stability power sources for bending and quadrupole magnets of TRISTAN project

    International Nuclear Information System (INIS)

    Kumagai, Noritaka; Ogawa, Shin-ichi; Koseki, Shoichiro; Nagasaka, Saburo.

    1985-01-01

    The excitation power sources for the main ring magnets of the TRISTAN project of the Ministry of Educations's National Laboratory for High Energy Physics requires strict performances of 10 -4 for both long time stability and the ripple factor of the DC output current to obtain a stable beam. To satisfy such specifications, a precision current detector, and active filter, and other such technologies are used for the power source. To verify the performance of this power source, a prototype was manufactured and a combined test was done with the magnets actually used at the National Laboratory. The results have proved that the output stability, ripple factor, current tracking, and other specifications are quite satisfactory and, at present, 80 sets have been manufactured for the TRISTAN project. This paper describes the project's power supply system and reports the results of performance tests on the prototype. (author)

  18. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    International Nuclear Information System (INIS)

    Grecheck, Eugene S.; Batalo, David P.

    2010-01-01

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  19. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  20. Seminar on the organization and management of a commercial nuclear power project

    International Nuclear Information System (INIS)

    Peddicord, K.L.; Alvis, J.M.; Chitkara, K.K.

    1986-01-01

    A main function of student branches of the American Nuclear Society (ANS) is to identify activities that contribute to the professional development and growth of its student members. Over the past several years, the ANS student branch at Texas A and M University has toured the construction site of the South Texas Nuclear Project (STNP), which is jointly owned by the Houston Lighting and Power Company (HL and P), the City of San Antonio, the Central Power and Light Company, and the City of Austin. This year, student branch organizers recognized that another aspect of a commercial nuclear power plant was not being covered either in the academic course work or the plant tours. This facet includes the organization and management required to undertake a major nuclear power project. To fill this gap, HL and P sponsored a one-day seminar that covered the various managerial functions for STNP. The seminar on the Organization and Management at a Commercial Nuclear Power Project was very interesting and beneficial. Other ANS branches and utilities may find this to be a useful model for future activities

  1. Project finance and photovoltaic power plants : a theoretical and practical perspective

    OpenAIRE

    Aasgaard, Anne Kristine

    2010-01-01

    Project finance is a defined structure for developing new activity which involves establishing the project as a separate unit. The review of literature exhibits the distinctive characteristics of project finance and provides a rationale of this form of financing. Project finance entails financial modelling, risk management, legal aspects and the creation of a financial structure. The thesis explores practical use of project finance in a case study of a photovoltaic power plant and presents a ...

  2. Research on quality assurance classification methodology for domestic AP1000 nuclear power projects

    International Nuclear Information System (INIS)

    Bai Jinhua; Jiang Huijie; Li Jingyan

    2012-01-01

    To meet the quality assurance classification requirements of domestic nuclear safety codes and standards, this paper analyzes the quality assurance classification methodology of domestic AP1000 nuclear power projects at present, and proposes the quality assurance classification methodology for subsequent AP1000 nuclear power projects. (authors)

  3. Economical aspects of a nuclear power plant project

    International Nuclear Information System (INIS)

    Meldonian, N.L.; Santos, E.M. dos

    1992-01-01

    This work describes different aspects and parameters that should be regarded as guidelines for economic evaluation of small and medium power plant projects. The main objective of an economic evaluation is to establish the plant's unitary cost and its economic figure of merit. To achieve that, a number of studies must be undertaken to compare the global competitiveness of a nuclear power plant with other energetic alternatives. These studies involve macro economy, energy generation, electricity transmission and global feasibility of the enterprise. It is concluded that the economic evaluation of a nuclear power plant should be considered as the culmination of a long process of planning at a national level. The main reasons are the investments involved, the technological developments required and political implications of the utilization of nuclear power energy. (author)

  4. Artificial neural networks to estimate the EMF ELF on car travelling near power transmission line

    Energy Technology Data Exchange (ETDEWEB)

    Al-Sayegh, O.A.; Qabazard, A.M. [Kuwait Inst. for Scientific Research, Safat (Kuwait). advanced Systems Division of Environment and Urban

    2007-07-01

    An artificial neural network (ANN) was developed to determine the electromagnetic field (EMF) and extremely low frequency (ELF) intensity on a vehicle body at different distances from a high tension power line and at varying power loads. EMF radiated emissions from ELF source power transmission lines can produce interference in the electric components in vehicles traveling at variable speed near the power lines. The passengers in the vehicle may also experience EMF-related health problems. Although EMF has been recently categorized as a new form of pollution, the situation has been largely ignored by the industry. Typically, electromagnetic fields at different frequencies show the fastest growing environmental influences. All populations are now exposed to varying degrees of EMF and the levels will continue to increase as technology advances. The purpose of this work was to promote discussion and help find design solutions to manufacture a new device for measuring the EMF at variable speed. In this study, a set of near field measurements outside the vehicle were used to train ANN. Estimations of the EMF ELF for various distances from the high tension power line were presented. It was determined that the most important factors affecting the electric field model include exposure conditions; size, shape and position of the exposed body in the field; and, surface charge density. The EMF ELF was found to increase near sagging areas of the overhead power transmission line. The EMF ELF was found to be proportional to the total amps flowing through the line at the time of measurement. 14 refs., 3 figs.

  5. Cash flow forecasting model for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Guo Jilin

    2002-01-01

    Cash flow forecasting is very important for owners and contractors of nuclear power projects to arrange the capital and to decrease the capital cost. The factors related to contractor cash flow forecasting are analyzed and a cash flow forecasting model is presented which is suitable for both contractors and owners. The model is efficiently solved using a cost-schedule data integration scheme described. A program is developed based on the model and verified with real project data. The result indicates that the model is efficient and effective

  6. Projected change in characteristics of near surface temperature inversions for southeast Australia

    Science.gov (United States)

    Ji, Fei; Evans, Jason Peter; Di Luca, Alejandro; Jiang, Ningbo; Olson, Roman; Fita, Lluis; Argüeso, Daniel; Chang, Lisa T.-C.; Scorgie, Yvonne; Riley, Matt

    2018-05-01

    Air pollution has significant impacts on human health. Temperature inversions, especially near surface temperature inversions, can amplify air pollution by preventing convective movements and trapping pollutants close to the ground, thus decreasing air quality and increasing health issues. This effect of temperature inversions implies that trends in their frequency, strength and duration can have important implications for air quality. In this study, we evaluate the ability of three reanalysis-driven high-resolution regional climate model (RCM) simulations to represent near surface inversions at 9 sounding sites in southeast Australia. Then we use outputs of 12 historical and future RCM simulations (each with three time periods: 1990-2009, 2020-2039, and 2060-2079) from the NSW/ACT (New South Wales/Australian Capital Territory) Regional Climate Modelling (NARCliM) project to investigate changes in near surface temperature inversions. The results show that there is a substantial increase in the strength of near surface temperature inversions over southeast Australia which suggests that future inversions may intensify poor air quality events. Near surface inversions and their future changes have clear seasonal and diurnal variations. The largest differences between simulations are associated with the driving GCMs, suggesting that the large-scale circulation plays a dominant role in near surface inversion strengths.

  7. [Restoration filtering based on projection power spectrum for single-photon emission computed tomography].

    Science.gov (United States)

    Kubo, N

    1995-04-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical "least squares filter" theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the "Butterworth" filtering method (cut-off frequency of 0.15 cycles/pixel), and "Wiener" filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99mTc filled cylinder, were used. NMSE of the "Butterworth" filter, "Wiener" filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images.

  8. Restoration filtering based on projection power spectrum for single-photon emission computed tomography

    International Nuclear Information System (INIS)

    Kubo, Naoki

    1995-01-01

    To improve the quality of single-photon emission computed tomographic (SPECT) images, a restoration filter has been developed. This filter was designed according to practical 'least squares filter' theory. It is necessary to know the object power spectrum and the noise power spectrum. The power spectrum is estimated from the power spectrum of a projection, when the high-frequency power spectrum of a projection is adequately approximated as a polynomial exponential expression. A study of the restoration with the filter based on a projection power spectrum was conducted, and compared with that of the 'Butterworth' filtering method (cut-off frequency of 0.15 cycles/pixel), and 'Wiener' filtering (signal-to-noise power spectrum ratio was a constant). Normalized mean-squared errors (NMSE) of the phantom, two line sources located in a 99m Tc filled cylinder, were used. NMSE of the 'Butterworth' filter, 'Wiener' filter, and filtering based on a power spectrum were 0.77, 0.83, and 0.76 respectively. Clinically, brain SPECT images utilizing this new restoration filter improved the contrast. Thus, this filter may be useful in diagnosis of SPECT images. (author)

  9. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  10. The study of atmospheric dispersion of radionuclide near nuclear power plant using CFD approach

    International Nuclear Information System (INIS)

    Nagrale, Dhanesh B.; Bera, Subrata; Deo, Anuj K.; Gaikwad, Avinash J.

    2015-01-01

    Most of the studies on atmospheric dispersion of radioactive material released from nuclear power plants are based on Gaussian plume models which fail to take account turbulence generated. The Fire Dynamic Simulator (FDS) code is one such flow model that uses a form of Navier-Stokes equation for low mach number applications. In the 0-2 km range near nuclear power plant, mainly near the source of emission of radionuclides, obstructions like natural draft cooling towers, plant building and structures are located. The stability class 'F' conditions and temperature of surrounding atmosphere, 15°C are considered in analysis. Main constituents of radionuclides released from stack mainly xenon, krypton. Two cases are carried out a) dispersion of gases without obstruction of cooling tower and b) dispersion of gases with obstruction of cooling tower. It is observed that mass fraction of radionuclides near the cooling tower ground increased to certain extent due to obstruction and wake effect. (author)

  11. Manpower development for nuclear power programme. China. Project findings and recommendations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1992-01-01

    The United Nations Development Program (UNDP) project was conceived in April 1985, implementation was started on preliminary authorization by summer 1986, and it was approved and signed in early 1987. The duration was originally planned for three years with a UNDP input of US$ 1,657.500 (including Government cost sharing of US$ 280,000). The project is now essentially completed with a few items still pending, though committed as firmly planned, and the current cost estimate is US$ 1,707.617. The objective of the project was to assist in establishing long-term training programmes in two training centres in the People's Republic of China (Qinshan and Suzhou) and strengthen the training capabilities at these centres. The two centres are intended to provide specialized comprehensive training in basic and applied nuclear power engineering disciplines as well as in construction, operation and maintenance of nuclear power plants to technical personnel assigned to the nuclear power plants in the People's Republic of China

  12. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  13. Long-term allocation of power from the Snettisham Project

    International Nuclear Information System (INIS)

    1993-01-01

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan

  14. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  15. Code of Conduct for wind-power projects - Feasibility study

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2009-02-01

    This final report deals with the results of a feasibility study concerning the development of a Code of Conduct for wind-power projects. The aim is to strengthen the acceptance of wind-power by the general public. The necessity of new, voluntary market instruments is discussed. The urgency of development in this area is quoted as being high, and the authors consider the feasibility of the definition of a code of conduct as being proven. The code of conduct can, according to the authors, be of use at various levels but primarily in project development. Further free-enterprise instruments are also suggested that should help support socially compatible and successful market development. It is noted that the predominant portion of those questioned are prepared to co-operate in further work on the subject

  16. Power monitoring and control for large scale projects: SKA, a case study

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  17. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  18. Evaluation of water quality conditions near proposed fish production sites associated with the Yakima Fisheries Project. Final report

    International Nuclear Information System (INIS)

    Dauble, D.d.; Mueller, R.P.; Martinson, G.A.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP

  19. Austin Children`s Museum ``Go Power`` project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  20. Bomber Deployments: A New Power Projection Strategy

    Science.gov (United States)

    2016-08-21

    AIR COMMAND AND STAFF COLLEGE DISTANCE LEARNING AIR UNIVERSITY BOMBER DEPLOYMENTS: A NEW POWER PROJECTION STRATEGY by...operating base (FOB), main operating base ( MOB ) and intermediate staging base (ISB).10 Each type of base requires certain actions to make it suitable for...closure of many main operating bases ( MOB ) overseas and the reluctance of many nations to permit permanent military bases on their soil.”15 This

  1. 75 FR 2133 - Construction and Operation of the Quartzsite Solar Energy Project, La Paz County, AZ (DOE/EIS-0440)

    Science.gov (United States)

    2010-01-14

    ... Quartzsite Solar Energy Project, La Paz County, AZ (DOE/EIS-0440) AGENCY: Western Area Power Administration... proposed Quartzsite Solar Energy Project (Project) in La Paz County, near Quartzsite, Arizona. Quartzsite Solar Energy, LLC (QSE) has applied to Western to interconnect the proposed Project to Western's power...

  2. Use of photographic film to estimate exposure near the Three Mile Island Nuclear Power Station

    International Nuclear Information System (INIS)

    Shuping, R.E.

    1981-02-01

    This report documents the methodology and results of a Bureau of Radiological Health study of the use of photographic film samples for estimating exposure levels near the Three Mile Island nuclear power station. The study was conducted to provide an independent assessment of the radiation levels near TMI following the accident on March 28, 1979

  3. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  4. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  5. Discussion on organization structure system of nuclear power projects in China

    International Nuclear Information System (INIS)

    Wang Zhi

    2011-01-01

    With the development of the nuclear power industry in China, several AE companies were born and now play a major role in building nuclear power projects in China and overseas. After studying current organization structure systems of all nuclear power AE companies in China and comparing with successful foreign ones, this paper proposes some approaches to optimize the structure. (author)

  6. Brownfields City of Houston Solar Project: Solar Power Analysis and Design Specifications

    Science.gov (United States)

    This document details the scope of work elements completed in support of this project, as well as recommendations for next steps towards solar project development and power purchase agreement negotiation and finalization.

  7. Financial analysis of wind power projects

    International Nuclear Information System (INIS)

    Juanico, Luis E.; Bergallo, Juan E.

    1999-01-01

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO 2 emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries

  8. Summary evaluation e-NV200 'Power to Amsterdam' project : February - June 2015

    NARCIS (Netherlands)

    Balm, Susanne; Spoelstra, Jop; van Holstein, Leigh; Moser, Thijs; van Kollem, Wouter

    2015-01-01

    In the Netherlands, the automobile manufacturer Nissan has initiated a unique project to stimulate the uptake of electric vehicles (EV) for commercial usage. This project is called “Power to Amsterdam” and started by the end of 2014. In the project, Nissan has enabled entrepreneurs in the region of

  9. Opportunities and Challenges for Near-Field Wireless Power Transfer: A Review

    Directory of Open Access Journals (Sweden)

    Aqeel Mahmood Jawad

    2017-07-01

    Full Text Available Traditional power supply cords have become less important because they prevent large-scale utilization and mobility. In addition, the use of batteries as a substitute for power cords is not an optimal solution because batteries have a short lifetime, thereby increasing the cost, weight, and ecological footprint of the hardware implementation. Their recharging or replacement is impractical and incurs operational costs. Recent progress has allowed electromagnetic wave energy to be transferred from power sources (i.e., transmitters to destinations (i.e., receivers wirelessly, the so-called wireless power transfer (WPT technique. New developments in WPT technique motivate new avenues of research in different applications. Recently, WPT has been used in mobile phones, electric vehicles, medical implants, wireless sensor network, unmanned aerial vehicles, and so on. This review highlights up-to-date studies that are specific to near-field WPT, which include the classification, comparison, and potential applications of these techniques in the real world. In addition, limitations and challenges of these techniques are highlighted at the end of the article.

  10. The power of community : the role of ownership in social marketing of wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Roscoe, D. [Scotian Windfields, Dartmouth, NS (Canada)

    2008-07-01

    This paper discussed the benefits of community ownership for wind power projects in Nova Scotia. The community economic development investment fund (CEDIF) is a pool of capital funds formed by selling shares to people within a defined community. CEDIFs are created to operate or invest in local business as part of a government initiative to provide incentives for local business development. Those eligible for CEDIFs include incorporated organizations with a minimum of 25 investors, and when 6 of the maximum 12 directors are from the local community. No investors may own more than 20 per cent. CEDIF incentives include pre-approved holdings for registered savings plans; a 30 per cent non-refundable equity tax credit against Nova Scotia taxes, and additional credits for maintaining investment. Local WindFields investors have invested in the Scotian WindFields in order to develop renewable energy projects. Community ownership of wind power projects can result in greater acceptance of wind power as well as increased economic prosperity and employment. Community ownership can also lead to improved land lease opportunities and relationships between contractors, local businesses, and federal and provincial governments. Details of wind power projects in Nova Scotia were provided. It was concluded that wind power developers should consider community ownership of wind projects. tabs., figs.

  11. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  12. Backgrounder : 1998 historic resources overview assessment, Churchill River power project

    International Nuclear Information System (INIS)

    1999-01-01

    A survey was conducted to gather information regarding the history of land-use of the Innu Nation of Labrador. The survey was made possible through research into land use and documentary sources plus the analysis of geomorphologic features and air photos. The areas of the survey included portions of the Strait of Belle Isle, Churchill Valley, proposed transmission routes of the Churchill Power Project, and survey lines at Atikonak Lake. Over 65 historical and traditional land-use sites were recorded, including two major Hudson Bay Company fur-trading posts in the Churchill Valley. This survey will be important in helping to ensure that important sites are not destroyed as a result of the proposed Churchill Power Project

  13. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  14. Factors Causing Delay of Modification Projects at Koeberg Nuclear Power Station

    International Nuclear Information System (INIS)

    Ntoyanto, S.

    2017-01-01

    Modification project delays could lead to: disrupting the maintenance shutdown (outage) projects' schedule, affecting electricity capacity of the national grid., possible load-shedding restricting electricity supply to domestic, commercial, and industrial consumers; and detrimental consequences to the country's economic activities. To address proficiency of a project manager by improving: Understanding of the organizational processes, High-level technical knowledge of a nuclear power plant technology

  15. Design of retinal-projection-based near-eye display with contact lens.

    Science.gov (United States)

    Wu, Yuhang; Chen, Chao Ping; Mi, Lantian; Zhang, Wenbo; Zhao, Jingxin; Lu, Yifan; Guo, Weiqian; Yu, Bing; Li, Yang; Maitlo, Nizamuddin

    2018-04-30

    We propose a design of a retinal-projection-based near-eye display for achieving ultra-large field of view, vision correction, and occlusion. Our solution is highlighted by a contact lens combo, a transparent organic light-emitting diode panel, and a twisted nematic liquid crystal panel. Its design rules are set forth in detail, followed by the results and discussion regarding the field of view, angular resolution, modulation transfer function, contrast ratio, distortion, and simulated imaging.

  16. Past nuclear power project experiences of Turkey

    International Nuclear Information System (INIS)

    Kutukcuoglu, A.

    1994-01-01

    In this paper, developments in the world for utilization of nuclear energy and, in parallel to these developments, works undertaken in Turkey are summarized. Besides this, future prospects in the field of nuclear energy in the world and in Turkey, and our opinion about the action to be taken in our county, in the light of past experiences of nuclear power projects that could not be succeeded, are presented

  17. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  18. Success Factors in Wind Power Projects

    International Nuclear Information System (INIS)

    Cabal, H.; Varela, M.; Lago, C.; Saez, R. M.

    2002-01-01

    The Spanish wind energy market has experienced an average annual increase over 60% in recent years. With more than 4.1 GW of power at the end of 2002, this market has became the second in Europe and the third in the world. With the objective of obtaining the origin of this success, an analysis of technical and economic features of selected wind projects has been undertaken to draw the outstanding factors that any new independent promoter/developer should take into account within this market. (Author) 16 refs

  19. Present status and future development of Qinshan nuclear power project

    International Nuclear Information System (INIS)

    Ouyang Yu

    1987-01-01

    Qinshan 300 MWe Nuclear power Project is the first domestically designed and constructed nuclear power plant in China. Here is a brief description of its progress in design work, equipment manufacture and site construction since the first structural concrete in March 1985. In Qinshan area four units of 600 MWe each are planned to be built with collaboration of proper foreign partners. (author)

  20. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  1. Adaptively Addressing Uncertainty in Estuarine and Near Coastal Restoration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Thom, Ronald M.; Williams, Greg D.; Borde, Amy B.; Southard, John A.; Sargeant, Susan L.; Woodruff, Dana L.; Laufle, Jeffrey C.; Glasoe, Stuart

    2005-03-01

    Act; CWPPRA) have incorporated very specific and detailed elements in a more active adaptive management effort. In Puget Sound, the Puget Sound Action Team uses site-specific case studies, monitoring, and public involvement to direct actions to reduce microbial contamination of harvestable shellfish. Small-scale projects can also be improved through application of adaptive management. For example, directed research and site assessments resulted in successful restoration of seagrasses near a ferry terminal in Puget Sound. It is recommended that all restoration programs be conducted in an adaptive management framework, and where appropriate, a more active adaptive management approach be applied. The net effect should be less uncertainty, improved project success, advancement of the science of restoration, and cost savings.

  2. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  3. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  4. Development and application of project management computer system in nuclear power station

    International Nuclear Information System (INIS)

    Chen Junpu

    2000-01-01

    According to the experiences in the construction of Daya Bay and Lingao nuclear power plants presents, the necessity to use the computers for management and their application in the nuclear power engineering project are explained

  5. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    International Nuclear Information System (INIS)

    1981-01-01

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations

  6. Metal intoxication of atmospheric precipitations near coal power stations

    International Nuclear Information System (INIS)

    Kwapulinski, J.; Zielonka, U.; Kwapulinska, G.; Nowak, B.

    1989-01-01

    Intoxication of atmospheric precipitation near power stations is presented. The migration of some metals in air is described by intoxication coefficient, which in 1981 for Pb changed from 2.25 to 2.96, for Cd from 1.92 to 3.0, for Cu from 2.31 to 4.44, for Fe from 2.78 to 3.95, and for Mn from 1.77 to 3.76. The coefficient value defines potential ecotoxicity of a given metal in the region investigated. Rain or snow intoxication by Pb, Cu, Cd, Fe and Mn, depending o their amount, is described by equation y=ax b . (author). 4 refs, 3 figs, 3 tabs

  7. 76 FR 9340 - Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13995-000] Mill Town Power Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 4, 2011, Mill Town Power Project filed an application for a...

  8. Near and long term pulse power requirements for laser driven inertial confinement fusion

    International Nuclear Information System (INIS)

    Gagnon, W.L.

    1979-01-01

    At the Lawrence Livermore Laboraory, major emphasis has been placed upon the development of large, ND:glass laser systems in order to address the basic physics issues associated with light driven fusion targets. A parallel program is directed toward the development of lasers which exhibit higher efficiencies and shorter wavelengths and are thus more suitable as drivers for fusion power plants. This paper discusses the pulse power technology which has been developed to meet the near and far term needs of the laser fusion program at Livermore

  9. Point Lepreau nuclear project unlocks power future of New Brunswick

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, E J [New Brunswick Electric Power Commission, Fredericton (Canada)

    1976-08-01

    Projects under development will increase the generating capacity of New Brunswick Electric Power Commission from 1.47 to 3.14 GW. Of these projects, the most significant is the 0.63 GW Point Lepreau CANDU reactor. Progress in the construction of the power reactor is summarized. The concrete reactor building was slipformed in April 1976. A second nuclear unit at Point Lepreau is being considered. Information is also provided on the new oil-fired station at Coleson Cove, a new oil- or coal-fired unit at Dalhousie and further hydro units at Mactaquac. A 0.16 GW pumped storage hydro unit at Green River is being considered. Information on transmission (Including the HVDC system), substations, and connection with Hydro Quebec is included.

  10. Managing water, fish and power : trends in environmental regulation of hydropower projects

    Energy Technology Data Exchange (ETDEWEB)

    Bursey, D.; McLean, J.; Longe, R. [Bull, Housser and Tupper LLP, Vancouver, BC (Canada)

    2009-07-01

    Recent trends in federal legislation related to the environmental impacts of hydroelectric power projects were reviewed. The study focused on a discussion of recent and proposed amendments to the Species at Risk Act, the Fisheries Act, and the Navigable Waters Protection Act. Challenges associated with risk management, the public perception of risk, and the communication of decisions related to the management and protection of aquatic ecosystems were discussed. The Brilliant Expansion Power Project (BRX) examined the interactions with white sturgeon on the Kootenay River in British Columbia (BC). A monitoring program was conducted during the project's construction in order to reduce the risk to sturgeon from blasting. A habitat enhancement feature was also constructed. It was concluded that the mitigation strategies used during the BRX project provide a useful example of innovation and adaptive management. 19 refs.

  11. Selected power reactor projects in Canada and the United States of America

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-11-01

    As part of its activities in connection with the development of nuclear power, the IAEA has undertaken a continuing study of the technology and economics of power reactors, with particular reference to the needs of the developing countries. Information on the progress made in eight power reactor projects, namely those of Bonus, Pathfinder, Elk River, Piqua, Hallam, Experimental Gas-Cooled Reactor (EGCR), High-Temperature Gas-Cooled Reactor (HTGCR) and Nuclear Power Demonstration (NPD), is presented in this report. Developments during the past year are shown, emphasis being placed on operating experience in the case of those reactors which have become critical. The Agency is grateful to the Governments of Canada and the USA, who have extended the necessary facilities for covering he different power reactor projects in their respective countries. The cooperation received from the reactor manufacturers, builders and operators is also gratefully acknowledged. It is hoped that this report will be of interest to reactor technologists and operators and those interested in the application of nuclear power.

  12. Selected power reactor projects in Canada and the United States of America

    International Nuclear Information System (INIS)

    1964-01-01

    As part of its activities in connection with the development of nuclear power, the IAEA has undertaken a continuing study of the technology and economics of power reactors, with particular reference to the needs of the developing countries. Information on the progress made in eight power reactor projects, namely those of Bonus, Pathfinder, Elk River, Piqua, Hallam, Experimental Gas-Cooled Reactor (EGCR), High-Temperature Gas-Cooled Reactor (HTGCR) and Nuclear Power Demonstration (NPD), is presented in this report. Developments during the past year are shown, emphasis being placed on operating experience in the case of those reactors which have become critical. The Agency is grateful to the Governments of Canada and the USA, who have extended the necessary facilities for covering he different power reactor projects in their respective countries. The cooperation received from the reactor manufacturers, builders and operators is also gratefully acknowledged. It is hoped that this report will be of interest to reactor technologists and operators and those interested in the application of nuclear power

  13. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  14. Power processing systems for ion thrusters.

    Science.gov (United States)

    Herron, B. G.; Garth, D. R.; Finke, R. C.; Shumaker, H. A.

    1972-01-01

    The proposed use of ion thrusters to fulfill various communication satellite propulsion functions such as east-west and north-south stationkeeping, attitude control, station relocation and orbit raising, naturally leads to the requirement for lightweight, efficient and reliable thruster power processing systems. Collectively, the propulsion requirements dictate a wide range of thruster power levels and operational lifetimes, which must be matched by the power processing. This paper will discuss the status of such power processing systems, present system design alternatives and project expected near future power system performance.

  15. Reaching an agreement to build a new coal-fired power plant near a national park by mitigating potential environmental impacts

    International Nuclear Information System (INIS)

    Miller, R.L.; Ruppel, T.C.; Evans, E.W.; Heintz, S.J.

    1994-01-01

    This paper presents an interesting example of compromise through comprehensive environmental analysis and intensive negotiation to build a coal-fired power plant near an environmentally sensitive area. In December 1993, the US Department of Energy (DOE) completed the final environmental impact statement (EIS) for the Healy clean Coal Project (HCCP), a proposed demonstration project that would be cost- shared by DOE and the Alaska Industrial Development and Export Authority (AIDEA). The HCCP would be built adjacent to the existing coal-fired Golden Valley Electric Association, Inc. (GVEA) Unit No. 1 in Healy, Alaska, about 4 miles north of Denali National Park and Preserve (DNPP). In response to US Department of the Interior (DOI) concerns about potential air quality related impacts on DNPP, DOE facilitated negotiations among DOE, AIDEA, and GVEA which overcame a ''stalemate'' situation. A Memorandum of Agreement was signed by all four parties, enabling DOI to withdraw its objections. The cornerstone of the Agreement is the planned retrofit of Unit No. 1 to reduce emissions of sulfur dioxide and oxides of nitrogen. If the demonstration technologies operate as expected, combined emissions from the Healy site would increase by only about 8% but electrical generation would triple. The Agreement is a ''win/win'' outcome: DOE can demonstrate the new technologies, AIDEA can build a new power plant for GVEA to operate, and DOE can safeguard the pristine environment DNPP

  16. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  17. Sustainable model for financial viability of decentralized biomass gasifier based power projects

    NARCIS (Netherlands)

    Palit, D.; Malhotra, R.; Kumar, Atul

    2011-01-01

    This paper made a modest attempt for designing a sustainable model for financial viability of biomass gasifier power projects for enhancing electricity access in India and other developing countries. For long term sustainability of distributed generation projects in remote rural areas, viability

  18. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  19. Building the feedback system of project experience,and expediting the scientific development of nuclear power construction

    International Nuclear Information System (INIS)

    Zhou Hai

    2009-01-01

    In accord with the status of the energy structure and electric power demand in China, the Chinese government has made the strategy of developing nuclear power actively. Confronting the good chance for nuclear power development, the writer takes the Fangjiashan nuclear power project as an example, puts forward a viewpoint that establishing the nuclear power project experience summarization and feedback system is an urgent need for expediting the scientific development of nuclear power. It also demonstrates the necessity, feasibility, and detailed measures, etc. (authors)

  20. Nuclear power plants near consumers from a safety-engineering point of view

    International Nuclear Information System (INIS)

    Kroeger, W.

    1986-11-01

    Special safety requirements must be met by a nuclear power station near the consumer. These requirements may not be formulated in a purely probabilistic way because of the methodological deficiencies identified. The existing protection concept is rather extended so as to include the requirement of engineered safeguards in order to limit the damage in case of a worst reactor accident. The suggested individual dose limit together with the calculation rules should ensure that the consequences of a worst accident are essentially limited to the plant and that no emergency protection measures and countermeasures need to be considered either in the short term or in the longer term to prevent health damage. The resulting features of a reactor near the consumer aim at better inherent safety characteristics, which is shown to be possible by reasonable technical means and which seems to have already been realized to a large extent in plants of small and perhaps also medium power already conceived. The way of thinking behind this suggestion is applicable to other sectors of industrial technology. Furthermore, it might serve as a basis in the discussion about general advanced safety criteria, which has been stimulated due to 'Chernobyl'. (orig./HP) [de

  1. The Power Plant Mapping Student Project: Bringing Citizen Science to Schools

    Science.gov (United States)

    Tayne, K.; Oda, T.; Gurney, K. R.; O'Keeffe, D.; Petron, G.; Tans, P. P.; Frost, G. J.

    2014-12-01

    An emission inventory (EI) is a conventional tool to quantify and monitor anthropogenic emissions of greenhouse gases and air pollutants into the atmosphere. Gridded EI can visually show geographical patterns of emissions and their changes over time. These patterns, when available, are often determined using location data collected by regional governments, industries, and researchers. Datasets such as Carbon Monitoring and Action (CARMA, www.carma.org) are particularly useful for mapping emissions from large point sources and have been widely used in the EI community. The EI community is aware of potentially significant errors in the geographical locations of point sources, including power plants. The big challenge, however, is to review tens of thousands of power plant locations around the world and correct them where needed. The Power Plant Mapping Student Project (PPMSP) is a platform designed for students in 4th through 12th grade to improve the geographical location of power plants indicated in existing datasets to benefit international EI research. In PPMSP, we use VENTUS, a web-based platform (http://ventus.project.asu.edu/) that invites citizens to contribute power plant location data. Using VENTUS, students view scenes in the vicinity of reported power plant coordinates on Google Maps. Students either verify the location of a power plant or search for it within a designated radius using various indicators, an e-guide, and a power plant photo gallery for assistance. If the power plant cannot be found, students mark the plant as unverified. To assure quality for research use, the project contains multiple checkpoints and levels of review. While participating in meaningful research that directly benefits the EI research community, students are engaged in relevant science curricula designed to meet each grade level's Next Generation Science Standards. Students study energy, climate change, the atmosphere, and geographical information systems. The curricula is

  2. Deep convolutional neural network processing of aerial stereo imagery to monitor vulnerable zones near power lines

    Science.gov (United States)

    Qayyum, Abdul; Saad, Naufal M.; Kamel, Nidal; Malik, Aamir Saeed

    2018-01-01

    The monitoring of vegetation near high-voltage transmission power lines and poles is tedious. Blackouts present a huge challenge to power distribution companies and often occur due to tree growth in hilly and rural areas. There are numerous methods of monitoring hazardous overgrowth that are expensive and time-consuming. Accurate estimation of tree and vegetation heights near power poles can prevent the disruption of power transmission in vulnerable zones. This paper presents a cost-effective approach based on a convolutional neural network (CNN) algorithm to compute the height (depth maps) of objects proximal to power poles and transmission lines. The proposed CNN extracts and classifies features by employing convolutional pooling inputs to fully connected data layers that capture prominent features from stereo image patches. Unmanned aerial vehicle or satellite stereo image datasets can thus provide a feasible and cost-effective approach that identifies threat levels based on height and distance estimations of hazardous vegetation and other objects. Results were compared with extant disparity map estimation techniques, such as graph cut, dynamic programming, belief propagation, and area-based methods. The proposed method achieved an accuracy rate of 90%.

  3. Conference on wind power development in the face of landscape and local project acceptability challenges

    International Nuclear Information System (INIS)

    Victoire Lejzerzon; Sauron, Claire; Villot, Marie; Ratzbor, Guenter; Tausch, Christian; Cagneaux, Bertrand; Jouneau, Agathe; Stemmer, Boris; Huebner, Gundula; Orozco-Souel, Paola; Lhermitte, Charles; Ferus, Elisabeth; Benezech, Philippe; Gunzelmann, Thomas

    2015-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on n wind power development in the face of landscape and local project acceptability challenges. In the framework of this French-German exchange of experience, participants addressed the following points: the conciliation between landscape protection and wind power development, the definition of landscape environmental quality criteria, the needs and usages of the departments in charge of the treatment of landscape studies in France, the socio-psychological approach of the local acceptability of wind farm projects, the re-powering tool for the improvement of the wind farm integration in the landscape, and the conciliation between the monuments maintenance and wind power development. This document brings together the available presentations (slides) made during this event: 1 - Conciliating landscape protection and wind power development goals in France (Marie Villot); 2 - Wind turbines: Conflicts between development goals, landscape and acceptance - Perception and criteria (Guenter Ratzbor); 3 - Bayern's wind power atlas: a planning tool which takes into account the landscape aspects (Christian Tausch); 4 - Landscape assessment in wind farms projects: what and how to do in French administrative procedures? (Bertrand Cagneaux); 5 - Methods for evaluation of landscape for wind farms projects - A French project developer's feedback (Agathe Jouneau); 6 - Landscape Assessment: Methods from German Landscape Practice (Boris Stemmer); 7 - Acceptance of Wind Turbines - Social Psychological Research (Gundula Huebner); 8 - Local consultation: who to involve, when and how? (Paola Orozco-Souel); 9 - Local acceptability: what dialogue concepts and strategies, and how to manage wind energy objection (Charles Lhermitte); 10 - Re-powering and landscape: chances and limits (Elisabeth Ferus); 11 - Wind power and cultural heritage: consultation and dialogue to succeed (Philippe Benezech); 12

  4. Power-Efficient Computing: Experiences from the COSA Project

    Directory of Open Access Journals (Sweden)

    Daniele Cesini

    2017-01-01

    Full Text Available Energy consumption is today one of the most relevant issues in operating HPC systems for scientific applications. The use of unconventional computing systems is therefore of great interest for several scientific communities looking for a better tradeoff between time-to-solution and energy-to-solution. In this context, the performance assessment of processors with a high ratio of performance per watt is necessary to understand how to realize energy-efficient computing systems for scientific applications, using this class of processors. Computing On SOC Architecture (COSA is a three-year project (2015–2017 funded by the Scientific Commission V of the Italian Institute for Nuclear Physics (INFN, which aims to investigate the performance and the total cost of ownership offered by computing systems based on commodity low-power Systems on Chip (SoCs and high energy-efficient systems based on GP-GPUs. In this work, we present the results of the project analyzing the performance of several scientific applications on several GPU- and SoC-based systems. We also describe the methodology we have used to measure energy performance and the tools we have implemented to monitor the power drained by applications while running.

  5. Near-shore wind power - protected seascapes, environmentalists' attitudes, and the technocratic planning perspective

    NARCIS (Netherlands)

    Wolsink, M.

    2010-01-01

    In contested wind farm developments, the dominant issue concerns scenic impact and the landscape at the proposed site. The number of large wind power schemes that have failed is growing. The case analysed here is a near-shore wind farm in the Dutch part of the Wadden Sea, in 2001 the largest wind

  6. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  7. Economic and financial benefits as a compensation for living near a nuclear power station. A case study of Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kato, Takaaki; Hatta, Masahisa; Matsumoto, Shiro; Nishikawa, Masashi

    2007-01-01

    Although dwellers living near a nuclear power station are entitled to economic/financial benefits such as increased job opportunities and local tax revenues pertaining to the power station, it is not clear whether such benefits are appreciated by the dwellers. Two findings of this study based upon a social survey of local dwellers living near the Kashiwazaki-Kariwa Nuclear Power Station are summarized as follows. First, an increase in the per capita sizes of the local tax revenue and national subsidies resulted in a larger share of respondents who thought that those revenues are beneficial. Therefore, local dwellers are aware of the sizes of economic/financial benefits. Second, given the same risk level of nuclear disaster, a larger per capita financial benefit resulted in a larger share of respondents who felt compensated for the nuclear risk. However, this increase in the number of compensated respondents is low relative to the increase in the amount of financial benefits. (author)

  8. 3D digital dynamic management of maintenance projects for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Baizhong; Luo Yalin; Fang Hao; Ma Li; Zhang Jie; Wang Ruobing; Xie Min

    2005-01-01

    The whole process for the application of digital plant technique in the equipment transport in reactor building and the dynamic management of the spatial arrangement in Daya Bay Nuclear Power Station was introduced in the paper. The establishment of 3D digital Daya Bay plant, and the method and procedure to apply it in the nuclear power plant maintenance project have been discussed. This project utilizes the outer database to preserve the maintenance status of equipments, and avoids the damage or changing of the original 3D final model. Based on the maintenance procedure, the spatial arrangement and schedule for the maintenance of nuclear power station have been simulated and optimized for the whole process. This technique can simulate and optimize the arrangement and spatial arrangement for maintenance in limited space. It has been applied successfully in the reactor vessel head replacement for Unit 2 of Daya Bay NPP to shorten the time for key routes and the total time of this project by 16 hours and 92.5 hours, respectively. (author)

  9. Data base on nuclear power plant dose reduction research projects

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated.

  10. Data base on nuclear power plant dose reduction research projects

    International Nuclear Information System (INIS)

    Khan, T.A.; Dionne, B.J.; Baum, J.W.

    1985-12-01

    This report contains project information on the research and development activities of the nuclear power industry in the area of dose reduction. It is based on a data base of information set up at the ALARA Center of Brookhaven National Laboratory. One purpose of this report is to draw attention to work in progress and to enable researchers and subscribers to obtain further information from the investigators and project managers. Information is provided on 180 projects, divided according to whether they are oriented to Engineering Research or to Health Physics Technology. The report contains indices on main category, project manager, principal investigator, sponsoring organization, contracting organization, and subject. This is an initial report. It is intended that periodic updates be issued whenever sufficient material has been accumulated

  11. How many Enrons? Mark-ups in the stated capital cost of independent power producers' (IPPs') power projects in developing countries

    International Nuclear Information System (INIS)

    Phadke, Amol

    2009-01-01

    I analyze the determinants of the stated capital cost of IPPs' power projects which significantly influences their price of power. I show that IPPs face a strong incentive to overstate their capital cost and argue that effective competition or regulatory scrutiny will limit the extent of the same. I analyze the stated capital costs of combined cycle gas turbine (CCGT) IPP projects in eight developing countries which became operational during 1990-2006 and find that the stated capital cost of projects selected without competitive bidding is 44-56% higher than those selected with competitive bidding, even after controlling for the effect of cost differences among projects. The extent to which the stated capital costs of projects selected without competitive bidding are higher compared those selected with competitive bidding, is a lower bound on the extent to which they are overstated. My results indicate the drawbacks associated with a policy of promoting private sector participation without an adequate focus on improving competition or regulation. (author)

  12. Evaluation of Water Quality Conditions Near Proposed Fish Production Sites Associated with the Yakima Fisheries Project, 1991-1993 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dauble, Dennis D.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP.

  13. Basic infrastructure for a nuclear power project

    International Nuclear Information System (INIS)

    2006-06-01

    There are several stages in the process of introducing nuclear power in a country. These include development of nuclear policies and regulations, feasibility studies, public consultations, technology evaluation, requests for proposals and evaluations, contracts and financing, supply, construction, commissioning, operation and finally decommissioning. This publication addresses the 'basic' infrastructure needs, which are adequate until the issue of the construction license. It is obvious that a fully developed nuclear infrastructure will be required for the further implementation stages of a nuclear power reactor. The officials and experts in each country will undertake the transition from a basic infrastructure to a fully developed infrastructure that covers the stages of construction, commissioning, operation and decommissioning. The publication is directed to provide guidance for assessing the basic infrastructure necessary for: - A host country to consider when engaging in the implementation of nuclear power, and - A supplier country to consider when assessing whether the recipient country is in an acceptable condition to begin the implementation of a nuclear power project. The target users are decision makers, advisers and senior managers in the governmental organizations, utilities, industrial organizations and regulatory bodies in the countries adopting nuclear power programmes or exporting supplies for these programmes. The governmental organizations that may find this publication useful include: Ministries of Economy, Energy, Foreign Affairs, Finance, Mining, Internal Affairs, Academic Institutions, Nuclear Energy Agencies and Environmental Agencies. This publication was produced within the IAEA programme directed to increase the capability of Member States to plan and implement nuclear power programmes and to establish and enhance national nuclear infrastructure. This publication should be used in conjunction with the IAEA Safety Standards Series and other

  14. U-tube based near-surface environmental monitoring in the Shenhua carbon dioxide capture and storage (CCS) project.

    Science.gov (United States)

    Li, Qi; Song, Ranran; Shi, Hui; Ma, Jianli; Liu, Xuehao; Li, Xiaochun

    2018-04-01

    The CO 2 injected into deep formations during implementation of carbon dioxide (CO 2 ) capture and storage (CCS) technology may leak and migrate into shallow aquifers or ground surfaces through a variety of pathways over a long period. The leaked CO 2 can threaten shallow environments as well as human health. Therefore, almost all monitoring programs for CCS projects around the world contain near-surface monitoring. This paper presents a U-tube based near-surface monitoring technology focusing on its first application in the Shenhua CCS demonstration project, located in the Ordos Basin, Inner Mongolia, China. First, background information on the site monitoring program of the Shenhua CCS demonstration project was provided. Then, the principle of fluid sampling and the monitoring methods were summarized for the U-tube sampler system, and the monitoring data were analyzed in detail. The U-tube based monitoring results showed that the U-tube sampler system is accurate, flexible, and representative of the subsurface fluid sampling process. The monitoring indicators for the subsurface water and soil gas at the Shenhua CCS site indicate good stratification characteristics. The concentration level of each monitoring indicator decreases with increasing depth. Finally, the significance of this near-surface environmental monitoring technology for CO 2 leakage assessments was preliminarily confirmed at the Shenhua CCS site. The application potential of the U-tube based monitoring technology was also demonstrated during the subsurface environmental monitoring of other CCS projects.

  15. A GLOBAL ASSESSMENT OF SOLAR ENERGY RESOURCES: NASA's Prediction of Worldwide Energy Resources (POWER) Project

    Science.gov (United States)

    Zhang, T.; Stackhouse, P. W., Jr.; Chandler, W.; Hoell, J. M.; Westberg, D.; Whitlock, C. H.

    2010-12-01

    NASA's POWER project, or the Prediction of the Worldwide Energy Resources project, synthesizes and analyzes data on a global scale. The products of the project find valuable applications in the solar and wind energy sectors of the renewable energy industries. The primary source data for the POWER project are NASA's World Climate Research Project (WCRP)/Global Energy and Water cycle Experiment (GEWEX) Surface Radiation Budget (SRB) project (Release 3.0) and the Global Modeling and Assimilation Office (GMAO) Goddard Earth Observing System (GEOS) assimilation model (V 4.0.3). Users of the POWER products access the data through NASA's Surface meteorology and Solar Energy (SSE, Version 6.0) website (http://power.larc.nasa.gov). Over 200 parameters are available to the users. The spatial resolution is 1 degree by 1 degree now and will be finer later. The data covers from July 1983 to December 2007, a time-span of 24.5 years, and are provided as 3-hourly, daily and monthly means. As of now, there have been over 18 million web hits and over 4 million data file downloads. The POWER products have been systematically validated against ground-based measurements, and in particular, data from the Baseline Surface Radiation Network (BSRN) archive, and also against the National Solar Radiation Data Base (NSRDB). Parameters such as minimum, maximum, daily mean temperature and dew points, relative humidity and surface pressure are validated against the National Climate Data Center (NCDC) data. SSE feeds data directly into Decision Support Systems including RETScreen International clean energy project analysis software that is written in 36 languages and has greater than 260,000 users worldwide.

  16. Social barriers in wind power implementation in The Netherlands: Perceptions of wind power entrepreneurs and local civil servants of institutional and social conditions in realizing wind power projects

    International Nuclear Information System (INIS)

    Agterbosch, Susanne; Glasbergen, Pieter; Vermeulen, Walter J.V.

    2007-01-01

    The primary social factors for the implementation of wind energy projects in a liberalized market are entrepreneurs willing to invest. Understanding conditions that trigger entrepreneurs to invest in these projects, and understanding conditions that determine the chance of success for entrepreneurs to implement and exploit their projects, is vital for setting up effective policies to stimulate wind electricity generation. This paper analyses the way in which wind power entrepreneurs and local civil servants experience social and institutional conditions in the operational process of realizing wind power projects, and their perceptions of policy implications. A groups support system in an electronic board room was used to analyze the perceptions. From the analysis it was concluded that wind power entrepreneurs and civil servants share the opinion that the institutionally embedded power position of local politicians, and the sensitiveness of the local political debate for the popular opinion are most critical for project realization. With regard to the proposed solutions, both groups differ in their approach. Entrepreneurs stress procedural solutions, such as limiting the possibilities to appeal, reducing the complexity of the formal authorization trajectory and using a top down planning approach. Civil servants stress more strategic solutions, such as providing more public information on the necessity of wind power for local politicians and citizens, and community involvement in planning processes. Finally, the analysis explains that steering strategies that have been developed at the national level to solve the planning problems at the operational level do not address the right problems. (author)

  17. Cooling tower influence on the rainwater pH near a major power plant

    Science.gov (United States)

    Ta-Yung Li

    1976-01-01

    The dense network of 12 rainguages, covering an area of 6 km in diameter, was reinstalled near PEPCO's 710 MW Chalk Point power plant in southern Maryland. The rainwater samples were collected from July to December 1974. This second season's collection of rainwater samples were analyzed and results showed a general shifting of pH toward higher values since...

  18. Advanced Modular Power Approach to Affordable, Supportable Space Systems

    Science.gov (United States)

    Oeftering, Richard C.; Kimnach, Greg L.; Fincannon, James; Mckissock,, Barbara I.; Loyselle, Patricia L.; Wong, Edmond

    2013-01-01

    Recent studies of missions to the Moon, Mars and Near Earth Asteroids (NEA) indicate that these missions often involve several distinct separately launched vehicles that must ultimately be integrated together in-flight and operate as one unit. Therefore, it is important to see these vehicles as elements of a larger segmented spacecraft rather than separate spacecraft flying in formation. The evolution of large multi-vehicle exploration architecture creates the need (and opportunity) to establish a global power architecture that is common across all vehicles. The Advanced Exploration Systems (AES) Modular Power System (AMPS) project managed by NASA Glenn Research Center (GRC) is aimed at establishing the modular power system architecture that will enable power systems to be built from a common set of modular building blocks. The project is developing, demonstrating and evaluating key modular power technologies that are expected to minimize non-recurring development costs, reduce recurring integration costs, as well as, mission operational and support costs. Further, modular power is expected to enhance mission flexibility, vehicle reliability, scalability and overall mission supportability. The AMPS project not only supports multi-vehicle architectures but should enable multi-mission capability as well. The AMPS technology development involves near term demonstrations involving developmental prototype vehicles and field demonstrations. These operational demonstrations not only serve as a means of evaluating modular technology but also provide feedback to developers that assure that they progress toward truly flexible and operationally supportable modular power architecture.

  19. Decommissioning project of commercial nuclear power plant

    International Nuclear Information System (INIS)

    Karigome, S.

    2008-01-01

    Decommissioning project of commercial nuclear power plant in Japan was outlined. It is expected that the land, after the decommissioning of commercial nuclear power plants, will serve as sites for new plants. Steps will be taken to reduce the amount of wastes generated and to recycle/reuse them. Wastes with a radioactivity concentration below the 'clearance level' need not be dealt with as radioactive material, and may be handled in the same way as conventional wastes. The Tokai-1 power station, a 166 MWe carbon dioxide cooled reactor which closed down in 1998, is being decommissioned and the first ten years as 'safe storage' to allow radioactivity to decay. Non-reactor grade components such as turbines were already removed, heat exchanger dismantling started and the reactor will be dismantled, the buildings demolished and the site left ready for reuse. All radioactive wastes will be classified as low-level wastes in three categories and will be buried under the ground. The total cost will be 88.5 billion yen -34.7 billion for dismantling and 53.8 billion for waste treatment including the graphite moderator. (T. Tanaka)

  20. Planning your first wind power project. A primer for utilities: Everything you need to know to bring your first wind power plant on-line

    International Nuclear Information System (INIS)

    Conover, K.; Davis, E.

    1994-12-01

    This primer has been prepared to help utility personnel become familiar with some or the details relative to wind power technology and project development. It is written as a series of relatively independent chapters to address specific topics or phases of wind power evaluation and development as they might occur within a utility. The topics include: wind prospecting and the first pass analysis, resource validation, project feasibility, resource planning and evaluation, resource acquisition, project development, equipment selection, project design and construction, and plant operation and maintenance

  1. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  2. Thermal Energy Corporation Combined Heat and Power Project

    Energy Technology Data Exchange (ETDEWEB)

    Turner, E. Bruce [Thermal Energy Corporation, Houston, TX (United States); Brown, Tim [Thermal Energy Corporation, Houston, TX (United States); Mardiat, Ed [Burns and McDonnell Engineering Company, Inc., Kansas City, MI (United States)

    2011-12-31

    To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power

  3. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  4. Severe weather data near nuclear power station and reprocessing fuel facility in Japan

    International Nuclear Information System (INIS)

    Nagata, Tadahisa

    2017-01-01

    The main weather data are updated at any time. The strong wind and tornado (strong wind/tornado) data are opened until March 2016 in Japan. The main weather and the strong wind/tornado data near the nuclear power station (NPS) were investigated. The earthquake, Tunami and volcano were not mentioned on this report. The main weather data might not be severe. The maximum temperature had not been considered in the safety analysis of NPS. The weather data of some small observation posts near NPSs had not been considered. The unusual high temperature and the local severe rain near NPS by the global warming may be considered in future. The maximum intensities of the strong wind/tornado in Japan and near NPS were Fujita-scale 3 and 2, respectively. The maximum intensities of almost half NPSs were Fujita-scale 1. The intensity and the number of the strong winds/tornados differed depending on NPS. The Japanese main weather and strong wind/tornado might not be severe compared with other country. (author)

  5. Wind Powering America's Wind for Schools Project: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.; Newcomb, C.

    2012-06-01

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  6. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  7. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2015-01-01

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  8. Comparative assessment of nuclear power and other options: the DECADES project

    International Nuclear Information System (INIS)

    Vladu, I. F.

    1996-01-01

    This paper presents the results obtained in constructing and implementing a general framework for performing comprehensive assessment within the inter-agency joint project on Databases and Methodologies for Comparative Assessment of Different Energy Sources for electricity generation. The project was established in 1992 by nine international organizations. A short description of the DECADES project objectives, structure and main components is given. The technology inventory databases, which are a major part of the project, address all the levels of different energy chains, from fuel extraction through electricity generation to waste disposal. These databases support comparative assessment in the power sector, by providing generic information as well as country or region specific information on existing technologies and on those expected to enter the market in the next two to three decades. The paper further touches on the types of assessment that can be carried out using the methodology and databases developed. It point out in this regard the possibilities and limitations of comparative assessments performed at the level of power plant, full electricity supply chain and country or region electricity generation system. Illustrative results are presented for comparisons performed at all these levels. Case studies and workshops and seminars are one of the main activities carried out until now for validation and dissemination of the DECADES Computer Tools. In those studies where it was considered, nuclear power appeared to be cost effective for reducing emissions of CO 2 , SO 2 , NO x and other greenhouse gases. Finally, the paper briefly introduce the activities envisaged for the phase II of the DECADES project which will focus on disseminating the current computer tools, providing training in the use of the tools, and supporting country studies, and on development of new analytical capabilities. The paper concludes with some findings and remarks pointing out the

  9. A combined hydro-nuclear-solar project for electric power production

    International Nuclear Information System (INIS)

    Yiftah, S.

    1985-01-01

    Some of the main, general-perspective themes of Dr. Alvin Weinberg's leadership and long and varied work are: the effect of present and future nuclear energy projects on society, not only in the United States but throughout the world; analysis, comparison, and combination of various sources of energy; extensive multiple use of nuclear energy complexes (so-called NUPLEX, for nuclear complex) for various areas of the world; and use of ''Big Technology'' and ''Big Science'' for solving, or helping to solve, political problems. A combined hydro-nuclear-solar project for electric power production is discussed, as well as two other energy-related engineering projects. Some of the projects originated or were inspired by work done at the Oak Ridge National Laboratory under the leadership of Dr. Alvin Weinberg. Also reported are the technical characteristics and interrelationships of the three components of the envisaged hydronuclear-solar project

  10. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  11. Birds and bird habitats: guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-10-01

    Established in 2009, the Green Energy Act aims to increase the use of renewable energy sources including wind, water, solar and bioenergy in Ontario. The development of these resources is a major component of the province's plan, which aims to mitigate the contribution to climate change and to involve the Ontario's economy in the improvement of the quality of the environment. The Green Energy Act also considers as important the implementation of a coordinated provincial approval process, suggesting the integration of all Ministry requirements into a unique process during the evaluation of newly proposed renewable energy projects. The Ministry of the Environment's Renewable Energy Approval Regulation details the requirements for wind power projects involving significant natural features. Birds are an important part of Ontario's biodiversity and, according to the Ministry of Natural Resources, their habitats are considered as significant wildlife habitat (SWH). The Renewable Energy Approval Regulation and this guideline are meant to provide elements and guidance in order to protect bird SWH during the selection of a location of wind power facilities. . 27 refs., 1 tab., 2 figs.

  12. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  13. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    Science.gov (United States)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  14. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    Science.gov (United States)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  15. REALIZATION OF INVESTMENT PROJECTS IN POWER GENERATION SECTOR AND DETERMINATION OF CAPITAL INVESTMENT SOURCES

    Directory of Open Access Journals (Sweden)

    V. N. Nagornov

    2008-01-01

    Full Text Available The paper contains information on the basic directions of an investment activity in the power generation sector of the Republic of Belarus and importance of the realization of planned actions at the present moment. The main sources for financing modernization of basic production funds of the Belarusian power generation system have been analyzed in the paper. The paper describes general problems and difficulties that the power industry is facing while realizing investment projects. The most important problem is a formation of sources for complete project financing due to sharp price rise for imported power resources. The paper considers various approaches to provision of the required sources for financing investment activity in the power sector. The paper shows the need for a tariff policy reform, which is to be aimed, first of all, at the reduction of the cross subsidizing in power tariffs.

  16. Daedalus Project's Light Eagle - Human powered aircraft

    Science.gov (United States)

    1987-01-01

    The Michelob Light Eagle is seen here in flight over Rogers Dry Lake at the NASA Dryden Flight Research Center, Edwards, California. The Light Eagle and Daedalus human powered aircraft were testbeds for flight research conducted at Dryden between January 1987 and March 1988. These unique aircraft were designed and constructed by a group of students, professors, and alumni of the Massachusetts Institute of Technology within the context of the Daedalus project. The construction of the Light Eagle and Daedalus aircraft was funded primarily by the Anheuser Busch and United Technologies Corporations, respectively, with additional support from the Smithsonian Air and Space Museum, MIT, and a number of other sponsors. To celebrate the Greek myth of Daedalus, the man who constructed wings of wax and feathers to escape King Minos, the Daedalus project began with the goal of designing, building and testing a human-powered aircraft that could fly the mythical distance, 115 km. To achieve this goal, three aircraft were constructed. The Light Eagle was the prototype aircraft, weighing 92 pounds. On January 22, 1987, it set a closed course distance record of 59 km, which still stands. Also in January of 1987, the Light Eagle was powered by Lois McCallin to set the straight distance, the distance around a closed circuit, and the duration world records for the female division in human powered vehicles. Following this success, two more aircraft were built, the Daedalus 87 and Daedalus 88. Each aircraft weighed approximately 69 pounds. The Daedalus 88 aircraft was the ship that flew the 199 km from the Iraklion Air Force Base on Crete in the Mediterranean Sea, to the island of Santorini in 3 hours, 54 minutes. In the process, the aircraft set new records in distance and endurance for a human powered aircraft. The specific areas of flight research conducted at Dryden included characterizing the rigid body and flexible dynamics of the Light Eagle, investigating sensors for an

  17. Power Production Management of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Zhang Cheng

    2010-01-01

    @@ The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China,Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project's dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable references for the operation of oversized hydropower plants.

  18. Summary of a reference book on financing arrangements for nuclear power projects in developing countries

    International Nuclear Information System (INIS)

    1993-05-01

    The IAEA has recently published a reference book entitled Financing Arrangements for Nuclear Power Projects in Developing Countries (Technical Reports Series No. 353). The book reviews comprehensively the main features and problems concerning the financing of such projects in developing countries and presents innovative approaches for power generation financing. It also discusses the special conditions and requirements of nuclear power projects and the complexities of their financing, focusing on the practical issues to be dealt with to achieve successful financing, as well as the constraints encountered by most developing countries. This booklet summarizes the important features of the financing arrangements discussed in the reference book and was prepared with the aim of widely disseminating the results

  19. The Sydvaerme project: District heating from the Barsebeck nuclear power plant

    International Nuclear Information System (INIS)

    Josefsson, L.

    1977-01-01

    The paper presents a summary report of a study on district heating from Barsebeck Nuclear Power Plant in Sweden, prepared cooperatively by the cities of Malmoe, Lund, Helsingborg, Landskrona and the electric power company Sydkraft. A future number 3 generating set at the Barsebeck nuclear power station could be designed for combined production of heat and electric power. The generating set could be completed after 1983, and could then supply about 65% of total district heating requirements. The first stage of the investigation includes a proposal for a technically feasible solution, sufficiently detailed to permit both technical and economic evaluation of the project. (author)

  20. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  1. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  2. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and substainability analysis

    DEFF Research Database (Denmark)

    Ringius, L.; Grohnheit, Poul Erik; Nielsen, Lars Henrik

    2002-01-01

    and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana,Egypt is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between......The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment anddevelopment - that is, baseline development......, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, andrecommends methodologies for and approaches to baseline development. To present the application...

  3. Stirling engine with hydraulic power output for powering artificial hearts

    International Nuclear Information System (INIS)

    Johnston, R.P.; Noble, J.E.; Emigh, S.G.; White, M.A.; Griffith, W.R.; Perrone, R.E.

    1975-01-01

    The DWDL heart power source combines the high efficiency of Stirling engines with the reliability, efficiency, and flexibility of hydraulic power transfer and control to ensure long system life and physiological effectiveness. Extended life testing has already been achieved with an engine module; animal in-vivo tests with an assist heart have consistently demonstrated required performance by biological synchronization and effective ventricle relief. The present System 5 can reliably meet near-term thousand-hour animal in-vivo test goals as far as the durability and efficacy of the power source are concerned. Carefully planned development of System 6 has produced major reductions in size and required input power. Research engine tests have provided the basis for achieving performance goals and the approach for further improvement is well established. The near term goal is 33 W heat input with 16 W input projected for normal physical activity. The goal of reduction of engine module volume to 0.9 liter has been achieved. Demonstrated reliability of 292 d for the engine and 35 d for the full system, as well as effectiveness of the artificial heart power source in short-term in-vivo tests indicate that life-limiting problems are now blood pump reliability and the machine-animal interface

  4. Code of Conduct for wind-power projects - Phase 3; Code of Conduct fuer windkraftprojekte. Phase 3 Machbarkeit und Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-11-15

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  5. NRC assessment of the Department of Energy annealing demonstration project

    International Nuclear Information System (INIS)

    Jackson, D.A.; Malik, S.N.

    1997-01-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner's Group, Consumers Power, Electricite' de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project

  6. Different regulatory strategies in regulation of nuclear power projects: An Indian experience

    International Nuclear Information System (INIS)

    Khan, Sohail Ahmad

    2002-01-01

    Regulatory strategy needed for management of safety and safety culture involves careful planning and use of engineering concepts keeping in mind feasibility to implement certain safety requirements. It also requires adequate attention on working environment and mental conditions of designers, operating and maintenance staff and regulators. Different strategies followed during safety review and regulatory inspection of nuclear power projects for improving status of safety management and safety cultures have given certain results. The present paper brings out certain experience gained during regulation of Indian Nuclear Power Projects by Atomic Energy Regulatory Board of India in the area of management of safety and safety culture. (author)

  7. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  8. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model

    Directory of Open Access Journals (Sweden)

    Hong-ze Li

    2013-01-01

    Full Text Available The external economies of wind power engineering project may affect the operational efficiency of wind power enterprises and sustainable development of wind power industry. In order to ensure that the wind power engineering project is constructed and developed in a scientific manner, a reasonable external economies evaluation needs to be performed. Considering the interaction relationship of the evaluation indices and the ambiguity and uncertainty inherent, a hybrid model of external economies evaluation designed to be applied to wind power engineering project was put forward based on the analytic hierarchy process (AHP and matter-element extension model in this paper. The AHP was used to determine the weights of indices, and the matter-element extension model was used to deduce final ranking. Taking a wind power engineering project in Inner Mongolia city as an example, the external economies evaluation is performed by employing this hybrid model. The result shows that the external economies of this wind power engineering project are belonged to the “strongest” level, and “the degree of increasing region GDP,” “the degree of reducing pollution gas emissions,” and “the degree of energy conservation” are the sensitive indices.

  9. Chiral power counting and pp → ppπ0 near threshold

    International Nuclear Information System (INIS)

    Van Kolck, U.; Miller, G.A.

    1995-01-01

    The pp → ppπ 0 reaction is studied near threshold using power counting arguments based on chiral perturbation theory with an explicit Δ degree of freedom. Important contributions include the so-called impulse term, rescattering via the Δ and rescattering via the (off-shell) seagull term responsible for s-wave pion-nucleon scattering. These contributions largely cancel so that their sum greatly underpredicts the total cross-section. Other mechanisms are also discussed. The inclusion of the previously proposed σ meson exchange mechanism is not sufficient to resolve the discrepancy with experiment

  10. New Teaching Environments Near Real-World-Like Laboratories for Power Engineering

    DEFF Research Database (Denmark)

    Holbøll, Joachim; Østergaard, Jacob

    2014-01-01

    , and operating real-world systems. The tool to be presented here is mainly establishment of teaching facilities at the Technical University of Denmark adjacent to the research facilities and where nearness to the ‘real world’ is essential and implemented by clearly visible research activities and by close......The Technical University of Denmark offers educations within power engineering at all levels: bachelor, master and PhD. Relevant bachelor programs use the CDIO educational framework, which allows the students to learn engineering fundaments in a context of conceiving, designing, implementing...

  11. Antenna diagnostics for power flow in extreme near-field of a standard gain horn

    DEFF Research Database (Denmark)

    Popa, Paula Irina; Breinbjerg, Olav

    2016-01-01

    The plane wave spectrum of an aperture antenna can be calculated from a complex measurement of the radiated near- or far-field and it facilitates antenna diagnostics for the extreme near-field of the antenna. While antenna diagnostics often concerns the magnitude of the co-polar field, the plane...... wave spectrum actually allows for determination of both magnitude and phase of all three components of the electric as well as the magnetic field - and thus also the Poynting vector. In this work we focus on the Poynting vector and thus the power flow in the extreme near-field; as an example we employ...... that these oscillations are not merely a “Gibbs-like” phenomenon due to the availability of only the visible region of the plane wave spectrum and they are not caused by multiple reflections between the horn and the near-field probe - but resulted from the interference between the direct field and the edge...

  12. Design of an electrically small circularly polarised turnstile antenna and its application to near-field wireless power transfer

    DEFF Research Database (Denmark)

    Yoon, Ick-Jae; Ling, Hao

    2014-01-01

    An electrically small circularly polarised antenna is designed and applied to near-field wireless power transfer as a means of alleviating orientation dependence. The antenna is miniaturised from a spl lambda//2-turnstile antenna by utilising the top loading and multiple folding techniques. A loc...... performance is verified in the far field. The power transfer efficiency is then examined in the near field via simulation and measurement. It is shown that the designed circularly polarised antenna is effective in mitigating orientation dependence down to a distance of 0.2λ.......An electrically small circularly polarised antenna is designed and applied to near-field wireless power transfer as a means of alleviating orientation dependence. The antenna is miniaturised from a spl lambda//2-turnstile antenna by utilising the top loading and multiple folding techniques. A local...... numerical search is used to determine the optimal antenna dimensions to achieve good axial ratio and impedance matching. The resulting design has a kr of 0.67 and shows good circular polarisation characteristic with a 3% axial ratio bandwidth. The designed antenna is fabricated and its circular polarisation...

  13. Magnetic Field Exposure Estimates Based on Power Lines Near Homes (invited paper)

    International Nuclear Information System (INIS)

    Ahlbom, A.; Feychting, M.

    1999-01-01

    Several epidemiological studies have based their estimates of magnetic field exposure on the proximity to power lines. This has been done in three principally different ways, which differ in the amount of information that is used. These are: (1) distance; (2) distance and configuration (wire code); and (3) distance, configuration, and load (calculated field). It is presumed that the more information that is used, the more accurate is the exposure estimate. All these three approaches suffer from the limitation that they only account for exposure that is generated by power lines. The influence on the in-home magnetic field from sources other than the power line are not considered, nor is exposure experienced at places other than the home. This raises the following question. What is the implication for the result of the epidemiological study of the exposure misclassification that is introduced by basing magnetic field exposure estimation on power lines near homes? Although the necessary information is only partly at hand the answers to this question will be discussed. The basis will be some general epidemiological principles combined with data from a Swedish study on residential exposure and cancer risk. (author)

  14. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  15. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  16. Data base on dose reduction research projects for nuclear power plants

    International Nuclear Information System (INIS)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K.

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report

  17. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  18. JPL's electric and hybrid vehicles project: Project activities and preliminary test results. [power conditioning and battery charge efficiency

    Science.gov (United States)

    Barber, T. A.

    1980-01-01

    Efforts to achieve a 100 mile urban range, to reduce petroleum usage 40% to 70%, and to commercialize battery technology are discussed with emphasis on an all plastic body, four passenger car that is flywheel assisted and battery powered, and on an all metal body, four passenger car with front wheel drive and front motor. For the near term case, a parallel hybrid in which the electric motor and the internal combustion engine may directly power the drive wheels, is preferred to a series design. A five passenger car in which the electric motor and the gasoline engine both feed into the same transmission is discussed. Upgraded demonstration vehicles were tested using advanced lead acid, nickel zinc, nickel iron, and zinc chloride batteries to determine maximum acceleration, constant speed, and battery behavior. The near term batteries demonstrated significant improvement relative to current lead acid batteries. The increase in range was due to improved energy density, and ampere hour capacity, with relatively 1 small weight and volume differences.

  19. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  20. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear power plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Sharkawy, E.

    1977-01-01

    The increasing rise in fossil-fuel prices has favourably affected the economics of nuclear power generation bringing down the economically competitive size of nuclear units closer to small sizes compatible with grid capacities in developing countries. This encouraged Egypt to turn to nuclear power to fulfil its future power needs. In implementing its first nuclear power plant, Egypt is facing various problems. The capacity of the national electric power system and its inherent characteristics pose certain restrictions on the size and design of the nuclear plant required. The availability of sufficient local qualified management, engineering and technical personnel to participate in both precontractual and construction phases of the plant is quite a major problem. Lack of local developed industry to back up the construction phase implies the dependence to a large extent on imported equipment, materials and technology. The paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation programme. Various problems encountered and anticipated in introducing the first nuclear power plant are also discussed. (author)

  1. A new market risk model for cogeneration project financing---combined heat and power development without a power purchase agreement

    Science.gov (United States)

    Lockwood, Timothy A.

    Federal legislative changes in 2006 no longer entitle cogeneration project financings by law to receive the benefit of a power purchase agreement underwritten by an investment-grade investor-owned utility. Consequently, this research explored the need for a new market-risk model for future cogeneration and combined heat and power (CHP) project financing. CHP project investment represents a potentially enormous energy efficiency benefit through its application by reducing fossil fuel use up to 55% when compared to traditional energy generation, and concurrently eliminates constituent air emissions up to 50%, including global warming gases. As a supplemental approach to a comprehensive technical analysis, a quantitative multivariate modeling was also used to test the statistical validity and reliability of host facility energy demand and CHP supply ratios in predicting the economic performance of CHP project financing. The resulting analytical models, although not statistically reliable at this time, suggest a radically simplified CHP design method for future profitable CHP investments using four easily attainable energy ratios. This design method shows that financially successful CHP adoption occurs when the average system heat-to-power-ratio supply is less than or equal to the average host-convertible-energy-ratio, and when the average nominally-rated capacity is less than average host facility-load-factor demands. New CHP investments can play a role in solving the world-wide problem of accommodating growing energy demand while preserving our precious and irreplaceable air quality for future generations.

  2. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  3. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  4. Completion of Belene Nuclear Power Plant: Project perspectives

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2006-01-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  5. Completion of Belene Nuclear Power Plant: Project perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Bogdanov, D. [Risk Engineering Ltd., CREFID, 34 Totleben Blvd., Sofia 1606 (Bulgaria)]. E-mail: bogdanov@riskeng.bg

    2006-07-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  6. Power Production Analysis of the OE Buoy WEC for the CORES Project

    DEFF Research Database (Denmark)

    Lavelle, John; Kofoed, Jens Peter

    This report describes the analysis performed on the OE Buoy for the CORES project by the wave energy group at Aalborg University, Denmark. OE Buoy is a type of Oscillating Water Column (OWC) wave energy converter as part of the CORES project. This type of device is one of the most developed...... to extract energy from the ocean (1). Typically, a Wells turbine is used for the Power Take Off (PTO) for OWCs. The Wells turbine has the advantage that it is self-rectifying – with the ability to operate with either direction of airflow, which changes during each cycle of the wave. This type of turbine...... which a total of 39 hours of power production data was collected. A data acquisition system was used to sample the sensors on board and the generator shaft power time-series data was used in the analysis here. A wave-rider buoy, located at the site of OE Buoy and operated by the Marine Institute Ireland...

  7. Quality management in an international nuclear power plant project

    International Nuclear Information System (INIS)

    Brion, J.; Crustin, J.

    1975-01-01

    SNR (Schneller Natriumgekuehlter Reaktor) is the fast reactor power plant being erected at Kalkar, Federal German Republic. Quality management in this project is a contractual obligation. Quality management is subdivided into quality engineering, set of actions performed before manufacturing, and quality control, set of material controls performed during fabrication. The two successive phases of the quality management are presented. The difficulties and improvment possibilities are discussed [fr

  8. Regional comparison of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Bowers, H.I.

    1984-01-01

    Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures

  9. High-power FEL design issues - a critical review

    Energy Technology Data Exchange (ETDEWEB)

    Litvinenko, V.N.; Madey, J.M.J.; O`Shea, P.G. [Duke Univ., Durham, NC (United States)

    1995-12-31

    The high-average power capability of FELs has been much advertised but little realized. In this paper we provide a critical analysis of the technological and economic issues associated with high-average power FEL operation from the UV to near IR. The project of IR FEL for the Siberian Center of photochemical researches is described. The distinguished features of this project are the use of the race-track microtron-recuperator and the {open_quotes}electron output of radiation{close_quotes}. The building for the machine is under reconstruction now. About half of hardware has been manufactured. The assembly of installation began.

  10. Mitogenomes from The 1000 Genome Project reveal new Near Eastern features in present-day Tuscans.

    Directory of Open Access Journals (Sweden)

    Alberto Gómez-Carballa

    Full Text Available Genetic analyses have recently been carried out on present-day Tuscans (Central Italy in order to investigate their presumable recent Near East ancestry in connection with the long-standing debate on the origins of the Etruscan civilization. We retrieved mitogenomes and genome-wide SNP data from 110 Tuscans analyzed within the context of The 1000 Genome Project. For phylogeographic and evolutionary analysis we made use of a large worldwide database of entire mitogenomes (>26,000 and partial control region sequences (>180,000.Different analyses reveal the presence of typical Near East haplotypes in Tuscans representing isolated members of various mtDNA phylogenetic branches. As a whole, the Near East component in Tuscan mitogenomes can be estimated at about 8%; a proportion that is comparable to previous estimates but significantly lower than admixture estimates obtained from autosomal SNP data (21%. Phylogeographic and evolutionary inter-population comparisons indicate that the main signal of Near Eastern Tuscan mitogenomes comes from Iran.Mitogenomes of recent Near East origin in present-day Tuscans do not show local or regional variation. This points to a demographic scenario that is compatible with a recent arrival of Near Easterners to this region in Italy with no founder events or bottlenecks.

  11. Dustfall design of open coal yard in the power plant-a case study on the closed reconstruction project of coal storage yard in shengli power plant

    Science.gov (United States)

    Wang, Kunpeng; Ji, Weidong; Zhang, Feifei; Yu, Wei; Zheng, Runqing

    2018-02-01

    This thesis, based on the closed reconstruction project of the coal storage yard of Shengli Power Plant which is affiliated to Sinopec Shengli Petroleum Administration, first makes an analysis on the significance of current dustfall reconstruction of open coal yard, then summarizes the methods widely adopted in the dustfall of large-scale open coal storage yard of current thermal power plant as well as their advantages and disadvantages, and finally focuses on this project, aiming at providing some reference and assistance to the future closed reconstruction project of open coal storage yard in thermal power plant.

  12. Summary of developments and future projects in nuclear power plant control and instrumentation in the Netherlands

    International Nuclear Information System (INIS)

    Plas, Y. van der

    1990-01-01

    A general view is given on the developments and trends due to instrumentation and control of the two nuclear power plants in the Netherlands around the year 1989. Several projects, under which for classification of systems and components and for emergency operating procedures, are executed in both plants. An OSART mission initiated a project to make possible the periodic test of safety commands during operation. An other large project concerned the replacement of the process presentation system in Nuclear Power Plant Borssele. In the article several other developments due to the application of I and C in existing plants are outlined generally. Since 1974, no new nuclear power plants have been constructed in the Netherlands. (author). 2 figs

  13. 76 FR 41238 - Post Rock Wind Power Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2011-07-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-3959-000] Post Rock Wind Power Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Rock Wind Power Project, LLC's application for market-based rate authority, with an accompanying rate...

  14. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  15. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  16. Low Friction Cryostat for HTS Power Cable of Dutch Project

    NARCIS (Netherlands)

    Chevtchenko, O.; Zuijderduin, R.; Smit, J.; Willen, D.; Lentge, H.; Thidemann, C.; Traeholt, C.

    2012-01-01

    Particulars of 6 km long HTS AC power cable for Amsterdam project are: a cable has to fit in an annulus of 160 mm, with only two cooling stations at the cable ends [1]. Application of existing solutions for HTS cables would result in excessively high coolant pressure drop in the cable, possibly

  17. Internal structure of reactor building for Madras Atomic Power Project

    International Nuclear Information System (INIS)

    Pandit, D.P.

    1975-01-01

    The structural configuration and analysis of structural elements of the internal structure of reactor building for the Madras Atomic Power Project has been presented. Two methods of analysis of the internal structure, viz. Equivalent Plane Frame and Finite Element Method, are explained and compared with the use of bending moments obtained. (author)

  18. Implementing CDIO project-based learning in training of Heat and Power engineers

    Science.gov (United States)

    Boiko, E. A.; Shishmarev, P. V.; Karabarin, D. I.; Yanov, S. R.; Pikalova, A. A.

    2017-11-01

    This paper presents the experience and current results of CDIO standards implementation in training of bachelors in Heat and Power Engineering at Thermal Power Stations academic department in Siberian Federal University. It provides information on methodology of modernization of educational programs, curricula and programs of disciplines in transition to CDIO project-based learning technology. Preliminary assessment and analysis of lessons learned and scaling perspectives are given.

  19. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  20. The impacts of the 1995 financial institution environmental guidelines on power projects

    International Nuclear Information System (INIS)

    Weaver, K.L.; Schott, G.A.

    1996-01-01

    In 1995, two of the most influential international financial institutions, The World Bank and The US Export-Import Bank (Ex-Im Bank) issued new environmental guidelines. These guidelines, particularly the World Bank guidelines, are used as a benchmark for evaluating the environmental acceptability of a project by many financial institutions, project developers, private investors, the public, and many developing countries. The impact of these guidelines must be well understood by developers of power projects in order to obtain the necessary financing, in addition to attracting investors, and obtaining national approvals and general public acceptance

  1. The Evocative Power of Projective Techniques for the Elicitation of Meaning

    Directory of Open Access Journals (Sweden)

    Caroline Porr PhD

    2011-03-01

    Full Text Available A unique project was undertaken by doctoral and postdoctoral students, and their mentor, from diverse backgrounds in health and social sciences to explore their past experiences as participants in a qualitative research training initiative called EQUIPP (Enhancing Qualitative Understanding of Illness Processes and Prevention. The purpose of the project was to create a symbolic representation of the EQUIPP program through the use of projective techniques. The authors examined the meaning of engaging in qualitative research training through images and conceptual metaphors that were subsequently consolidated thematically and then portrayed in the form of a newly constructed logo that was developed with the assistance of a professional graphic designer. Projective techniques proved to be a powerful, evocative tool for eliciting meaning and translating concrete experiences into visual discourse. In this paper, the authors discuss how projective techniques were operationalized and consider their broad implications for qualitative research.

  2. Laguna Verde: a 120% extended power up-rate project developed by Iberdrola

    International Nuclear Information System (INIS)

    Merino Teillet, A.; Garcia-Serrano Tapia, J. L.; Ruiz Gutierrez, L.

    2010-01-01

    The experience which this document wants to present, describes the work being developed by IBERDROLA Ingenieria y Construccion, for the Laguna Verde plant in Mexico, owned by the Federal Electricity Commission (CFE). This generation plant consists of two light boiling water type units (BWR) design by General Electric in the 80's. The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Up-rate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power, whilst upgrading and renovating plant equipment and installations to achieve a license renewal from 40 to 60 years of operation The consortium formed in 97% by IBERDROLA Ingenieria y Construccion SAU and in 3% by ALSTOM Mexicana, S.A. de CV, was awarded the contract in an international bid, competing against General Electric and Siemens. The project began in March 2007 and is scheduled to finalize in December 2010. At this point the work carried out include modifications of the main condenser replacement, moisture separator reheaters (MSR's) and feedwater heaters no. 5 and 6 in the two units, therefore having executed two out of four scheduled outages. The scope, development and organization of this project, whose basic elements include the design, engineering, training, supply of equipment, dismantling, installation, testing, commissioning, treatment and delivery of radioactive waste generated during the project implementation to CFE, is aimed to ensure a safe and reliable operation of the plant under the new conditions of increased thermal power of the reactor, with a thermal cycle optimized so that the gross power of the generator increase from the current 686.7 MWe to a value of 817.1 MWe in both units. An Extended Power Up-rate means an opportunity to modernize equipments, to improve maintenance, to get a better plant knowledge and to motivate the employees facing a challenging project. This project, being the

  3. Economic Impacts from Indiana's First 1,000 Megawatts of Wind Power

    Energy Technology Data Exchange (ETDEWEB)

    Tegen, S.; Keyser, D.; Flores-Espino, F.; Hauser, R.

    2014-08-01

    The magnitude of Indiana's available wind resource indicates that the development of wind power infrastructure has the potential to support millions of dollars of economic activity in the state. The Jobs and Economic Development Impact (JEDI) models, developed by the National Renewable Energy Laboratory, are tools used to estimate some of the economic impacts of energy projects at the state level. JEDI calculates results in the form of jobs, earnings, and economic output in three categories: project development and onsite labor, local revenue and supply chain, and induced impacts. According to this analysis, the first 1,000 MW of wind power development in Indiana (projects built between 2008 and 2011): supported employment totaling more than 4,400 full-time-equivalent jobs in Indiana during the construction periods; supports approximately 260 ongoing Indiana jobs; supported nearly $570 million in economic activity for Indiana during the construction periods; supported and continues to support nearly $40 million in annual Indiana economic activity during the operating periods; generates more than $8 million in annual property taxes; generates nearly $4 million annually in income for Indiana landowners who lease their land for wind energy projects.

  4. The role of insurance and risk management in new power plant projects

    International Nuclear Information System (INIS)

    Ryan, R.

    1988-01-01

    Insurance, and other risk management techniques, can be used to facilitate the financing and construction of power plant projects. This paper describes certain techniques, then it concentrates on insurance based solutions. The objective of this paper is to point out how the insurance industry can help small power producers. First, the standard insurance coverages will be reviewed. Then coverages that have been specifically designed for the alternative energy, cogeneration and small power producing industries will be explained. Some real life examples will be discussed to show how the coverages really work

  5. Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates

    Energy Technology Data Exchange (ETDEWEB)

    Burford, D.P. [Southern Company Services, Inc., Birmingham, AL (United States)

    1997-12-31

    The Chiyoda Thoroughbred CT-121 flue gas desulfurization (FGD) process at Georgia Power`s Plant Yates completed a two year demonstration of its capabilities in late 1994 under both high- and low-particulate loading conditions. This $43 million demonstration was co-funded by Southern Company, the Electric Power Research Institute and the DOE under the auspices of the US Department of Energy`s Round II Innovative Clean Coal Technology (ICCT) program. The focus of the Yates Project was to demonstrate several cost-saving modifications to Chiyoda`s already efficient CT-121 process. These modifications included: the extensive use of fiberglass reinforced plastics (FRP) in the construction of the scrubber vessel and other associated vessels, the elimination of flue gas reheat through the use of an FRP wet chimney, and reliable operation without a spare absorber module. This paper focuses on the testing results from the last trimester of the second phase of testing (high-ash loading). Specifically, operation under elevated ash loading conditions, the effects of low- and high-sulfur coal, air toxics verification testing results and unexpected improvements in byproduct gypsum quality are discussed.

  6. Evaluating The Financial Consequences of Different Financing Structure for Nuclear Power Project under Malaysian Market

    International Nuclear Information System (INIS)

    Muhammed Zulfakar Zolkaffly; Faisal Izwan Abdul Rashid; Siti Syarina Mat Sali; Fairuz Suzana Mohd Chachuli; Mohd Azmi Sidid Omar

    2016-01-01

    Full text: In 2010, Malaysia through the Economic Transformation Programme (ETP) has initiated an effort to explore nuclear energy as an option for electricity generation post-2020 in order to meet country's growing energy demand and diversify its energy mix. To date, Malaysia is focusing its efforts on the preparatory activities, pending to make decision to embark on nuclear power project. The development of nuclear power plants is a major undertaking for any country which that requires huge financial implications and commitments. On this note, this paper aims at evaluating the financial consequences of different financing structure for nuclear power project under Malaysian market condition, based on two key financial indicators, namely, Net Present Value (NPV) and Internal Rate of Return (IRR). The computer model FINPLAN developed by the IAEA was used to perform this study. The result shows that different financing structure significantly affect the sensitivity of NPV and IRR, that may be of interest to the investors in exploring viable financing structure for nuclear power project development. (author)

  7. Power spectrum analysis of the x-ray scatter signal in mammography and breast tomosynthesis projections.

    Science.gov (United States)

    Sechopoulos, Ioannis; Bliznakova, Kristina; Fei, Baowei

    2013-10-01

    To analyze the frequency domain characteristics of the signal in mammography images and breast tomosynthesis projections with patient tissue texture due to detected scattered x-rays. Acquisitions of x-ray projection images of 19 different patient breasts were simulated using previously acquired volumetric patient images. Acquisition of these images was performed with a dedicated breast CT prototype system, and the images were classified into voxels representing skin, adipose, and glandular tissue with a previously validated automated algorithm. The classified three dimensional images then underwent simulated mechanical compression representing that which is performed during acquisition of mammography and breast tomosynthesis images. The acquisition of projection images of each patient breast was simulated using Monte Carlo methods with each simulation resulting in two images: one of the primary (non-scattered) signal and one of the scatter signal. To analyze the scatter signal for both mammography and breast tomosynthesis, two projections images of each patient breast were simulated, one with the x-ray source positioned at 0° (mammography and central tomosynthesis projection) and at 30° (wide tomosynthesis projection). The noise power spectra (NPS) for both the scatter signal alone and the total signal (primary + scatter) for all images were obtained and the combined results of all patients analyzed. The total NPS was fit to the expected power-law relationship NPS(f) = k/f β and the results were compared with those previously published on the power spectrum characteristics of mammographic texture. The scatter signal alone was analyzed qualitatively and a power-law fit was also performed. The mammography and tomosynthesis projections of three patient breasts were too small to analyze, so a total of 16 patient breasts were analyzed. The values of β for the total signal of the 0° projections agreed well with previously published results. As expected, the scatter

  8. Projections of spent fuel to be discharged by the U.S. nuclear power industry

    International Nuclear Information System (INIS)

    Alexander, C.W.; Kee, C.W.; Croff, A.G.; Blomeke, J.O.

    1977-10-01

    Calculated properties of spent fuel projected to be discharged and accumulated by the U.S. nuclear power industry through the year 2031 A.D. are presented. The projections are based on installed nuclear capacities of 380 and 543 GW(e) in the year 2000 and 2030, respectively. They include compilations of the grams of the elements, curies of radioactivity, thermal decay power, photon and neutron emission rates, and radiotoxicities of the assemblies that are accumulated at a Spent Unreprocessed Fuel Facility (SURFF), allowing for delays of 5 and 10 years before shipment to SURFF

  9. Projections of spent fuel to be discharged by the U. S. nuclear power industry

    Energy Technology Data Exchange (ETDEWEB)

    Alexander, C.W.; Kee, C.W.; Croff, A.G.; Blomeke, J.O.

    1977-10-01

    Calculated properties of spent fuel projected to be discharged and accumulated by the U.S. nuclear power industry through the year 2031 A.D. are presented. The projections are based on installed nuclear capacities of 380 and 543 GW(e) in the year 2000 and 2030, respectively. They include compilations of the grams of the elements, curies of radioactivity, thermal decay power, photon and neutron emission rates, and radiotoxicities of the assemblies that are accumulated at a Spent Unreprocessed Fuel Facility (SURFF), allowing for delays of 5 and 10 years before shipment to SURFF.

  10. Marion Industrial Substation project

    International Nuclear Information System (INIS)

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines

  11. Western GeoPower Corp. brochure : nature's own clean, renewable energy

    International Nuclear Information System (INIS)

    2004-10-01

    This brochure describes the most advanced geothermal project in Canada. British Columbia's Western GeoPower Corporation holds Canada's only geothermal lease issued for commercial production of electricity. The company's South Meager Geothermal Project is expected to bring 100 MW of generating capacity on stream in 2007 and an additional 100 MW in 2009. The project has a maximum potential of 250 MW. Geothermal energy was described as being the heat radiating from the Earth's molten core that can be harnessed to produce electricity, steam and hot water for industrial, commercial and residential use. This brochure explained how geothermal energy is created, where it is found, and its importance in the global energy scene. Potential geothermal power capacity is estimated to be 50,000 times the energy of all known petroleum reserves. Most countries of the Pacific Rim have developed geothermal resources to produce electricity. Iceland produces 80 per cent of its power requirements from geothermal energy. The cost of generating electricity from geothermal resources has been reduced by 25 per cent in the past decade due to technological advances. In addition, geothermal power plants receive incentives and premium prices related to their capacity. Geothermal power plants are extremely reliable and have a 95 per cent load capacity utilization. The thermal reservoir defined at South Meager has an areal extent of 4.5 to 7.5 square km and a thickness of 2,800 metres. This high temperature field located near Whistler, British Columbia is a major geothermal site with enough electricity for a city of about 500,000 people. The project is located near the province's main electricity grid which provides a direct link with the Bonneville Power Authority grid in the northwestern United States. The three phases of the South Meager Geothermal Project are: (1) resource confirmation in 2004-2005, (2) feasibility study, permitting and financing in 2005, and (3) project design and

  12. Advanced Low Temperature Geothermal Power Cycles (The ENTIV Organic Project) Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Mugerwa, Michael [Technip USA, Inc., Claremont, CA (United States)

    2015-11-18

    Feasibility study of advanced low temperature thermal power cycles for the Entiv Organic Project. Study evaluates amonia-water mixed working fluid energy conversion processes developed and licensed under Kalex in comparison with Kalina cycles. Both cycles are developed using low temperature thermal resource from the Lower Klamath Lake Geothermal Area. An economic feasibility evaluation was conducted for a pilot plant which was deemed unfeasible by the Project Sponsor (Entiv).

  13. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  14. An Integrated Assessment Framework of Offshore Wind Power Projects Applying Equator Principles and Social Life Cycle Assessment

    Directory of Open Access Journals (Sweden)

    Yu-Che Tseng

    2017-10-01

    Full Text Available This paper reviews offshore wind power project finance and provides an integrated assessment that employs Equator Principles, life cycle assessment, risk assessment, materiality analysis, credit assessment, and ISAE 3000 assurance. We have not seen any comprehensive review papers or book chapters that covers the entire offshore wind power project finance process. We also conducted an SWancor Formosa Phase 1 case study to illustrate the application of integrated assessment to better assist policymakers, wind farm developers, practitioners, potential investors and observers, and stakeholders in their decisions. We believe that this paper can form part of the effort to reduce information asymmetry and the transaction costs of wind power project finance, as well as mobilize green finance investments from the financial sector to renewable energy projects to achieve a national renewable energy policy.

  15. Optimization design of toroidal core for magnetic energy harvesting near power line by considering saturation effect

    Science.gov (United States)

    Park, Bumjin; Kim, Dongwook; Park, Jaehyoung; Kim, Kibeom; Koo, Jay; Park, HyunHo; Ahn, Seungyoung

    2018-05-01

    Recently, magnetic energy harvesting technologies have been studied actively for self-sustainable operation of applications around power line. However, magnetic energy harvesting around power lines has the problem of magnetic saturation, which can cause power performance degradation of the harvester. In this paper, optimal design of a toroidal core for magnetic energy harvesters has been proposed with consideration of magnetic saturation near power lines. Using Permeability-H curve and Ampere's circuital law, the optimum dimensional parameters needed to generate induced voltage were analyzed via calculation and simulation. To reflect a real environment, we consider the nonlinear characteristic of the magnetic core material and supply current through a 3-phase distribution panel used in the industry. The effectiveness of the proposed design methodology is verified by experiments in a power distribution panel and takes 60.9 V from power line current of 60 A at 60 Hz.

  16. The power of knowledge in collaborative projects across North and South

    DEFF Research Database (Denmark)

    Adriansen, Hanne Kirstine; Madsen, Lene Møller

    This paper studies outcome of collaboration between universities in Africa and Scandinavia. The African higher education landscape is a product of the colonial powers and subsequent uneven development leading to an academic dependency as argued by a number of African researchers. Today, many...... in the paper, where we (i) explores how North-driven projects approach knowledge as universal and transferable and thereby ignore diversity and local historical context; (ii) analyses the cultural production of African academics and methodological hegemony in collaborative projects; (iii) concludes...

  17. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  18. An applicable 5.8 GHz wireless power transmission system with rough beamforming to Project Loon

    Directory of Open Access Journals (Sweden)

    Chang-Jun Ahn

    2016-06-01

    Full Text Available In recent, Google proposed the Project Loon being developed with the mission of providing internet access to rural and remote areas using high-altitude balloons. In this paper, we describe an applicable prototype of 5.8 GHz wireless power transmission system with rough beamforming method to Project Loon. From the measurement results, transmit beamforming phased array antenna can transmit power more efficiently compared to a horn antenna and array antenna without beamforming with increasing the transmission distance. For the transmission distance of 1000 mm, transmit beamforming phased array antenna can obtain higher received power about 1.46 times compared to array antenna without transmit beamforming.

  19. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  20. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  1. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken

  2. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken. (Author)

  3. Brief introduction to project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Chen Jie

    1996-01-01

    The key points in development and engineering project management of full scope simulator for Qinshan 300 MW Nuclear Power Unit are briefly introduced. The Gantt chart, some project management methods and experience are presented. The key points analysis along with the project procedure will be useful to the similar project

  4. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  5. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Fouly, M.F.; El-Sharkawy, E.; El-Saiedi, A.F.

    1977-01-01

    This paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation program. Different problems encountered and anticipated in introducing the first nuclear power plant are also discussed

  6. M2 priority screening system for near-term activities: Project documentation. Final report December 11, 1992--May 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-12

    From May through August, 1993, the M-2 Group within M Division at LANL conducted with the support of the LANL Integration and Coordination Office (ICO) and Applied Decision Analysis, Inc. (ADA), whose purpose was to develop a system for setting priorities among activities. This phase of the project concentrated on prioritizing near-tenn activities (i.e., activities that must be conducted in the next six months) necessary for setting up this new group. Potential future project phases will concentrate on developing a tool for setting priorities and developing annual budgets for the group`s operations. The priority screening system designed to address the near-term problem was developed, applied in a series of meeting with the group managers, and used as an aid in the assignment of tasks to group members. The model was intended and used as a practical tool for documenting and explaining decisions about near-term priorities, and not as a substitute for M-2 management judgment and decision-making processes.

  7. Restoring the Power Projection Capabilities of the U.S. Armed Forces

    Science.gov (United States)

    2017-02-16

    stealthy UAVs; swarms of small, expendable UAVs; and robotic sensors on the surface. The idea is to spread sensors across a number of different...powered exoskeleton , also known as the Talon Project • Develop swarming and autonomous unmanned vehicles a David Ochmanek, Peter A. Wilson, Brenna

  8. Divorced women at retirement: projections of economic well-being in the near future.

    Science.gov (United States)

    Butrica, B A; Iams, H M

    2000-01-01

    The Modeling Income in the Near Term (MINT) data system projects retirement income for persons retiring in the 1990s through 2020. Using those data, we examine the economic well-being of divorced women at retirement. The MINT data system improves upon previous estimates of Social Security benefits by: Measuring and projecting years of marriage to determine if the 10-year requirement has been met, Projecting lifetime earnings until retirement and eligibility for Social Security retirement benefits, and Estimating lifetime earnings of former spouses. MINT also makes independent projections of each retiree's income from pensions, assets, and earnings (for working beneficiaries). As a result of changes in marital patterns, MINT projects that the proportion of women who are divorced will increase. At the same time, the proportion of those women who are eligible for auxiliary benefits is projected to decrease, for two main reasons. First, changes in women's earnings and work patterns result in more women receiving retired-worker benefits based on their own earnings. Second, an increased number of divorced women will not meet the 10-year marriage requirement for auxiliary benefits. Despite the projected decrease over time in eligibility rates for auxiliary benefits, the level of Social Security benefits is projected to change little between the older and younger birth cohorts of divorced women entering retirement. According to the MINT data, the most vulnerable of divorced women will be those who have not met the 10-year marriage requirement. Poverty rates will be higher for them than for all other divorced women. This group of divorced women is projected to grow as more and more women divorce from shorter marriages. With more women divorcing and with fewer divorced women meeting the 10-year marriage requirement, the proportion of economically vulnerable aged women will increase when the baby boom retires. Further research is warranted on this long neglected subject

  9. Nuclear power programmes and medium term projections in the OECD area

    International Nuclear Information System (INIS)

    Miida, J.; Haeussermann, W.; Mankin, S.

    1977-01-01

    The paper describes nuclear power growth forecasts up to 1985 on an individual country basis for the OECD area, based on present nuclear programmes. For the period between 1985 and the year 2000, no individual countries' estimates are given. The projections for this period are subdivided into three main areas: OECD Europe, North America and OECD Pacific Region. These projections are derived from the presently prevailing estimates concerning total energy growth, the increasing share of electricity requirements in total energy requirements and the growth of the nuclear share in electrical installed capacity. The basic assumptions are discussed and the combination of various possibilities results in upper and lower growth limits, which should include the most likely development. An attempt is also made to describe probable scenarios of nuclear reactor strategies, taking into account developments under way in the OECD area. Finally, the factors liable to influence nuclear power growth in a positive or negative way are briefly analysed

  10. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  11. The environmental aspects of a tidal power project in the upper reaches of the Bay Fundy

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, D.C.; Longhurst, A.R.

    1979-02-01

    A recommendation for pre-investment design studies for a tidal power development in the Cumberland Basin region of the Bay of Fundy has been made by the Bay of Fundy Tidal Power Review Board and is backed by Canadian provincial and federal governments. A brief history of regional tidal power proposals is presented, and procedures for determining the environmental impacts of the project are outlined. Possible environmental consequences of tidal power development can be hypothesized, but the existing environmental data base is sparse. Investigations are presently being expanded by university and governmental scientists, and specific impact assessment studies will be commissioned if the project is authorized to proceed. (1 map, 11 references)

  12. Peripheral blood cells among community residents living near nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yuan-Teh; Hsu, Hsiu-Ching; Chien, Kuo-Liong; Yang, Chi-Yu; Chen, Wen Jone [Department of Internal Medicine, National Taiwan University College of Medicine, No. 7 Chungshan South Road, 10020 Taipei (Taiwan, Province of China); Sung, Fung C. [Institute of Environmental Health, National Taiwan University College of Public Health, Taipei (Taiwan, Province of China); Lin, Ruey S. [Institute of Epidemiology, National Taiwan University College of Public Health, Taipei (Taiwan, Province of China)

    2001-12-03

    Information about hematopoieses as a result of exposure to very low levels of radiation is scarce. To investigate the human hematopoietic effect of very low level radiation exposure, measurements of peripheral blood components were performed among 3602 men and women, aged 35 and above, living in a community near two nuclear power installations in Chinshan, Taiwan. The radiation level that each individual was exposed to was represented by a surrogate level, '+', a transformed distance from each individual's residence to the two power plants D{sub 1} and D{sub 2}. In addition to comparing average hematology measurements, multiple regression analyses were done to include age, gender, smoking, drinking status and the surrogate radiation exposure level as independent variables. Univariate and bivariate analyses showed that the hematology measurements had significant associations with age, gender, smoking or drinking. The multiple regression analyses revealed that significant positive associations with '+' were found for hemoglobin, hematocrit, platelet, white blood cell and red blood cell. The platelet count might increase for 208.7x10{sup 3}/{mu}l if the exposure from the nuclear plants increased by one exposure unit. This type of association implies that those who lived closer to the nuclear power installation had a higher blood cell count; we suspect that this could be a type of radiation hormesis.

  13. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  14. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  15. Wind power projects and Aboriginal consultation

    Energy Technology Data Exchange (ETDEWEB)

    Isaac, T. [McCarthy Tetrault LLP, Vancouver, BC (Canada)

    2006-07-01

    This presentation outlined some of the legal aspects related to Aboriginal involvement in wind power development consultation processes and disputes. Aboriginal rights are rights held by Aboriginal people that are an element of a practice, custom, or tradition integral to the culture of groups claiming such rights. Wind power developers should understand that Aboriginal rights claims may include fishing; whaling; transportation; and cultural and spiritual activities. Aboriginal title is a subcategory of Aboriginal rights, and is a right to land itself, and an encumbrance on the Crown's underlying title to land. Weak Aboriginal claims where potential infringement by energy developers is minor may only require notice and information. Strong prima facie cases for Aboriginal rights and title where the potential for infringement is of high significance may result in more extensive consultation involving interim solutions; formal Aboriginal participation in decision-making processes; and written responses demonstrating how Aboriginal concerns have been considered. There are a number of circumstances requiring a case-by-case approach, and the Crown may make decisions in the face of Aboriginal disagreement. However, energy developers should ensure that consultation processes are fair and reasonable. Conflicting interests can often be successfully resolved through consultation, and accommodation to Aboriginal rights may include mitigation, avoiding interference, and agreeing to as little infringement as possible. Aboriginal title may attach to private land but only to the Crown's underlying title. The Crown has no duty to consult respecting Aboriginal title on private land because title has already been infringed. In these cases, duty to consult and accommodate may be discharged through other regulatory processes such as environmental impact assessments. It was concluded that wind power project proponents should build a relationship with the Crown, as avoiding

  16. Correcting a Persistent Manhattan Project Statistical Error

    Science.gov (United States)

    Reed, Cameron

    2011-04-01

    In his 1987 autobiography, Major-General Kenneth Nichols, who served as the Manhattan Project's ``District Engineer'' under General Leslie Groves, related that when the Clinton Engineer Works at Oak Ridge, TN, was completed it was consuming nearly one-seventh (~ 14%) of the electric power being generated in the United States. This statement has been reiterated in several editions of a Department of Energy publication on the Manhattan Project. This remarkable claim has been checked against power generation and consumption figures available in Manhattan Engineer District documents, Tennessee Valley Authority records, and historical editions of the Statistical Abstract of the United States. The correct figure is closer to 0.9% of national generation. A speculation will be made as to the origin of Nichols' erroneous one-seventh figure.

  17. Data base on dose reduction research projects for nuclear power plants: Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Baum, J.W.

    1989-05-01

    This is the third volume in a series of reports that provide information on dose-reduction research and health physics technology for nuclear power plants. The information is taken from data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 80 new projects, covering a wide area of activities. Projects on steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Collective dose data from the United States and other countries are also presented. In the conclusion, we suggest that although new advanced reactor design technology will eventually reduce radiation exposures at nuclear power plants to levels below serious concern, in the interim an aggressive approach to dose reduction remains necessary. 20 refs.

  18. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  19. The Comparative Effectiveness of Variants of Construction of Electricity Export Projects

    Directory of Open Access Journals (Sweden)

    Anatoly Vladimirovich Lagerev

    2014-06-01

    Full Text Available The study describes a methodological approach that evaluates the comparative efficiency of construction of export-oriented power plants and transmission lines taking into account the development of power industry in the region and uncertainty (ambiguity of initial information. At the first stage the authors determine socio-economic effects of each project of construction of export-oriented power plants. With the help of optimization models they choose options that can guarantee the balanced and cost-effective development of the regional electric power system. Then using a simulation model the researchers assess commercial viability of previously selected projects. The article applies this approach for selecting the preferred option of electricity export from Eastern Siberia to China. This study shows that the project of CPP based on Kovykta natural gas with electricity transmission line to Chinese border (near Zabaikalsk is more preferable one in comparison with other projects (CPP based on Kansk-Achinsk coal in Krasnoyarsky krai; CPP based on coal in the Republic of Buryatia and Zabaikalsky krai (Olon-Shibirskaya CPP; New Kharanorskaya CPP; CPP based on Mugunsky coal in Irkutskaya oblast

  20. High-Power Hall Propulsion Development at NASA Glenn Research Center

    Science.gov (United States)

    Kamhawi, Hani; Manzella, David H.; Smith, Timothy D.; Schmidt, George R.

    2014-01-01

    The NASA Office of the Chief Technologist Game Changing Division is sponsoring the development and testing of enabling technologies to achieve efficient and reliable human space exploration. High-power solar electric propulsion has been proposed by NASA's Human Exploration Framework Team as an option to achieve these ambitious missions to near Earth objects. NASA Glenn Research Center (NASA Glenn) is leading the development of mission concepts for a solar electric propulsion Technical Demonstration Mission. The mission concepts are highlighted in this paper but are detailed in a companion paper. There are also multiple projects that are developing technologies to support a demonstration mission and are also extensible to NASA's goals of human space exploration. Specifically, the In-Space Propulsion technology development project at NASA Glenn has a number of tasks related to high-power Hall thrusters including performance evaluation of existing Hall thrusters; performing detailed internal discharge chamber, near-field, and far-field plasma measurements; performing detailed physics-based modeling with the NASA Jet Propulsion Laboratory's Hall2De code; performing thermal and structural modeling; and developing high-power efficient discharge modules for power processing. This paper summarizes the various technology development tasks and progress made to date

  1. Solar thermal power systems point-focusing thermal and electric applications projects. Volume 1: Executive summary

    Science.gov (United States)

    Marriott, A.

    1980-01-01

    The activities of the Point-Focusing Thermal and Electric Applications (PETEA) project for the fiscal year 1979 are summarized. The main thrust of the PFTEA Project, the small community solar thermal power experiment, was completed. Concept definition studies included a small central receiver approach, a point-focusing distributed receiver system with central power generation, and a point-focusing distributed receiver concept with distributed power generation. The first experiment in the Isolated Application Series was initiated. Planning for the third engineering experiment series, which addresses the industrial market sector, was also initiated. In addition to the experiment-related activities, several contracts to industry were let and studies were conducted to explore the market potential for point-focusing distributed receiver (PFDR) systems. System analysis studies were completed that looked at PFDR technology relative to other small power system technology candidates for the utility market sector.

  2. Experimental study on an S-band near-field microwave magnetron power transmission system on hundred-watt level

    Science.gov (United States)

    Zhang, Biao; Jiang, Wan; Yang, Yang; Yu, Chengyang; Huang, Kama; Liu, Changjun

    2015-11-01

    A multi-magnetron microwave source, a metamaterial transmitting antenna, and a large power rectenna array are presented to build a near-field 2.45 GHz microwave power transmission system. The square 1 m2 rectenna array consists of sixteen rectennas with 2048 Schottky diodes for large power microwave rectifying. It receives microwave power and converts them into DC power. The design, structure, and measured performance of a unit rectenna as well as the entail rectenna array are presented in detail. The multi-magnetron microwave power source switches between half and full output power levels, i.e. the half-wave and full-wave modes. The transmission antenna is formed by a double-layer metallic hole array, which is applied to combine the output power of each magnetron. The rectenna array DC output power reaches 67.3 W on a 1.2 Ω DC load at a distance of 5.5 m from the transmission antenna. DC output power is affected by the distance, DC load, and the mode of microwave power source. It shows that conventional low power Schottky diodes can be applied to a microwave power transmission system with simple magnetrons to realise large power microwave rectifying.

  3. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  4. Fusion power plant economics

    International Nuclear Information System (INIS)

    Miller, R.L.

    1996-01-01

    The rationale, methodology, and updated comparative results of cost projections for magnetic-fusion-energy central-station electric power plants are considered. Changing market and regulatory conditions, particularly in the U.S., prompt fundamental reconsideration of what constitutes a competitive future energy-source technology and has implications for the direction and emphasis of appropriate near-term research and development programs, for fusion and other advanced generation systems. 36 refs., 2 figs., 2 tabs

  5. Utility-Scale Concentrating Solar Power and Photovoltaic Projects: A Technology and Market Overview

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Lowder, T.; Canavan, B.

    2012-04-01

    Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary of the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.

  6. The THESEUS project -- 50 MWe solar thermal power for Crete

    Energy Technology Data Exchange (ETDEWEB)

    Schillig, F.; Geyer, M.; Kistner, R.; Aringhoff, R.; Nava, P.; Brakmann, G.

    1998-07-01

    A consortium of European industry, utilities and research institutions from Greece, Germany, Spain and Italy attempts to implement a 52 MWe solar thermal power plant with parabolic trough technology on the Greek island of Crete sponsored by the EU' s THERMIE program. The increased demand for electricity on the island, a consequence of the growing allurement of the island as a tourist resort, makes it necessary to expand the installed capacity on Crete during the next years. According to the capacity expansion plans of Greek' s utility PPC a 160 MWe heavy fuel-fired power plant complex--two 30 MWe diesel units and two 50 MWe steam turbine units--is foreseen to be built by the year 2002. In this paper a description of the technical, economical and environmental aspects of the THESEUS project is provided. Moreover a market entry strategy for solar thermal power generation is discussed.

  7. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  8. High stabilized power sources for bending and quadrupole magnets of TRISTAN project

    International Nuclear Information System (INIS)

    Kumagai, Noritaka; Ogawa, Shin-ichi; Koseki, Shoichiro; Nagasaka, Saburo.

    1984-01-01

    In the power source exciting the electro-magnets for the electron ring of TRISTAN project being advanced in the National Laboratory for High Energy Physics, the performance as strict as 10 -4 is required for its long hour stability and pulsating rate of DC output current in order to maintain beam stably. For satisfying such specification, the structure of power source using a high accuracy current detector, an active filter and so on was adopted. In order to verify the performance of this power source, the trial manufacture was carried out independently, and the test combining with actual magnets was performed. As the results, it was confirmed that the power source had the sufficient performance about its output stability, pulsating rate, current-following property and so on. At present, the manufacture of 80 actual power sources is in progress. In this paper, the power source system and the results of performance test of the power source made for trial are reported. The power sources are divide into B power sources for exciting deflecting electro-magnets and Q power sources for exciting quadrupole electro-magnets. (Kako, I.)

  9. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  10. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  11. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project; Analise economico-financeira do empreendimento 'Usina Nuclear Angra 3'

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Ronaldo Barata de [ELETROBRAS Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)]. E-mail: rbarata@eletronuclear.gov.br

    2005-07-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  12. Radiation protection actions at Swedish nuclear power plants 1994-2002 and some reflections about the near future

    International Nuclear Information System (INIS)

    Erixon, Stig; Godaas, Tommy; Hofvander, Peter; Lund, Ingmar; Malmqvist, Lars; Thimgren, Ingela; Oelander-Guer, Hanna

    2003-12-01

    This report provides a summary of radiation protection experiences over the years 1994-2002 in the Swedish nuclear power industry. Actions to reduce radiation levels in reactor systems, occupational exposure results and some reflections about the near future are presented

  13. Comparison of physico-chemical parameters of groundwater from shallow aquifers near 2 thermal power plants in Punjab

    International Nuclear Information System (INIS)

    Gill, S.K.; Sahota, S.K.; Sahota, G.P.S.; Sahota, B.K.; Sahota, H.S.

    1993-01-01

    Physico-chemical parameters of groundwater from shallow aquifers near thermal power plants at Bathinda and Ropar have been measured. Increase in metallic content of water is noted in both the cases due to deposition of coal fly ash from the power plants on the soil. High values of calcium chloride, calcium carbonate and total dissolved solids are observed in Bathinda groundwater while Ropar groundwater is rich in ferric, fluoride and nitrate contents. (author). 8 refs., 1 fig., 1 tab

  14. New power plants in Europe? A challenge for project and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Hartung, M. [RWE Technology GmbH, Essen (Germany)

    2010-07-01

    Against the backdrop of the age structure of the European power plant fleet and the EU's climate protection targets, a significant need for new-build and replacement power plant capacity is becoming apparent. RWE has thus founded RWE Technology in order to achieve its growth targets, but also to implement its ongoing power plant new-build programme in the order of no fewer than 12,000 MW in capacity. This company combines the project management and engineering capacity of the Group in order to meet the challenges posed by the fast-changing energy market. The following article explains the specific steps taken to achieve these objectives. (orig.)

  15. 75 FR 66389 - Notice of Availability of the Record of Decision for the Blythe Solar Power Project and...

    Science.gov (United States)

    2010-10-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-048811, LLCAD060000, L51010000.FX0000, LVRWB09B2600] Notice of Availability of the Record of Decision for the Blythe Solar Power Project and... CACA-048811 for the proposed Blythe Solar Power Project (BSPP). Chevron Energy Solutions entered into a...

  16. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  17. Collaborative decision-making on wind power projects based on AHP method

    Science.gov (United States)

    Badea, A.; Proştean, G.; Tămăşilă, M.; Vârtosu, A.

    2017-01-01

    The complexity of projects implementation in Renewable Energy Sources (RES) requires finding collaborative alliances between suppliers and project developers in RES. Links activities in supply chain in RES, respectively, transportation of heavy components, processing orders to purchase quality raw materials, storage and materials handling, packaging, and other complex activities requiring a logistics system collaboratively to be permanently dimensioned properly selected and monitored. Requirements imposed by stringency of wind power energy projects implementation inevitably involves constraints in infrastructure, implementation and logistics. Thus, following an extensive research in RES project, to eliminate these constraints were identified alternative collaboration to provide feasible solutions on different levels of performance. The paper presents a critical analysis of different collaboration alternatives in supply chain for RES projects, selecting the ones most suitable for particular situations by using decision-making method Analytic Hierarchy Process (AHP). The role of AHP method was to formulate a decision model by which can be establish the collaboration alternative choice through mathematical calculation to reduce the impact created by constraints encountered. The solution provided through AHP provides a framework for detecting optimal alternative collaboration between suppliers and project developers in RES and avoids some breaks in the chain by resizing safety buffers for leveling orders in RES projects.

  18. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  19. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  20. Interlaboratory comparison of measuring results of magnetic field near 400 kV overhead power line

    Directory of Open Access Journals (Sweden)

    Grbić Maja

    2012-01-01

    Full Text Available The paper presents a comparison of measured results of magnetic field near 400 kV overhead power lines obtained by three laboratories. This interlaboratory comparison was performed to ensure confidence in the quality of the test results. The measured results were analyzed with standard methods, using En number, based on which the evaluation of the laboratories was performed.

  1. Solution and implementation of project ''Simulator of WWER-440 nuclear power plant''

    International Nuclear Information System (INIS)

    Koukal, V.

    1985-01-01

    The time data are given of the development and construction of the simulator of a WWER-440 nuclear power plant unit. The individual tasks are summed up which are related to the project implementation, and cooperating institutions and enterprises are listed. (J.C.)

  2. Decommissioning project feedback experience in the Japan Atomic Energy Research Institut

    International Nuclear Information System (INIS)

    Yanagihara, S.; Tachibana, M.; Miyajima, K.

    2003-01-01

    Since starting the research and development program for peaceful use of nuclear energy in 1950's, various research and demonstration facilities have been constructed in research organizations, universities and commercial sectors in Japan. Some of the nuclear facilities constructed in the early stage of research and development have been retired to be decommissioned because of completion of the initial objectives in the Japan Atomic Energy Research Institute (JAERI). On the other hand, since the first commercial operation of nuclear power plant (1968), the number of nuclear power plants has increased up to 52 plants operating as of August 2003 in Japan. The shear of nuclear energy accounts approximately for 35% of electricity generation in total at present time. However, several nuclear power plants have been operated for more than 25 years and two nuclear power plants are expected to be finally shutdown by 2010 to be eventually decommissioned. The Tokai Power Station, the oldest Japanese nuclear power plant operated by the Japan Atomic Power Company, was permanently shutdown from March 1998 and it is in decommissioning stage at this time. The Fugen, which is advanced thermal reactor operated by the Japan Nuclear Cycle Development Institute (JNC), was finally shutdown on March, 2003 after 25 years operation to be decommissioned. In addition, relating to planned unification between JAERI and JNC in 2005, the studies have been in progress on decommissioning and radioactive waste treatment and disposal; the cost was estimated to be 10 to 30 billion Japanese yens per year during 80 years for decommissioning of nearly 200 nuclear facilities. Decommissioning of nuclear facilities is thus getting to be one of important issues in Japan. Decommissioning of nuclear facilities might be possible using conventional and/or partially improved technology. However, reviewing project feedback experience on decommissioning and decontamination might contribute to solve various issues

  3. IAEA TC Project 'Strengthening safety and reliability of fuel and materials in nuclear power plants'

    International Nuclear Information System (INIS)

    Makihara, Y.

    2008-01-01

    The Regional TC Project in Europe RER9076 'Strengthening Safety and Reliability of Fuel and Materials in Nuclear Power Plants' was launched in 2003 as a four-year project and was subsequently extended in 2006 to run through 2008. The purpose of the Project is to support the Central and Eastern European countries with the necessary tools to fulfill their own fuel and material licensing needs. The main objective will be to provide quality data on fuel and materials irradiated in power reactors and in dedicated experiments carried out in material test reactors (MTRs). Within the framework of the Project, ten tasks were implemented. These included experiments performed at the test facilities in the region, training courses and workshops related to fuel safety. While several tasks are expected to be completed by the end of RER9076, some remain. It would be desirable to initiate a new RER Project from the next TC cycle (2009-2011) in order to take over RER9076 and to implement new tasks required for enhancing fuel safety in the region. (author)

  4. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  5. South Ukraine Nuclear Power Plant. Advanced Computer Information System Project

    International Nuclear Information System (INIS)

    Hord, J.; Afanasiev, N.; Smith, C.; Kudinov, Yu.

    1997-01-01

    The South Ukraine upgrade is the first of many that will take place in the former eastern bloc countries over the next several years. Westron is currently developing a similar system for the Zaporozhe nuclear power plant. In addition, there are eleven other WWER type units in operation in the Ukraine, as well as twenty seven others in operation throughout Eastern and Central Europe and Russia - all potential upgrade projects. (author)

  6. Finance structure and public enlightenment program of the first Turkish nuclear power plant project (a case study)

    International Nuclear Information System (INIS)

    Lutfi Sarici, E.

    2000-01-01

    This paper deals with four closely related subjects. These are: the positioning of nuclear energy in Turkey's energy planning by presenting supply and demand figures of electricity, giving emphasis to resource availability, pointing out the necessity of diversification of resources; the ongoing situation for realization of the Akkuyu Project with its updated milestones, alternative offers requested for the Akkuyu Nuclear Power Plant and member companies of the consortiums who already have submitted the three bids; the financing of big-scale energy investment projects in developing countries by giving special emphasis to the Akkuyu Nuclear Power Plant Project including the financing requirements in the Bid Specifications, OECD rules for financing, the requirements of financial agents, and financing means of domestic participation; public enlightenment during establishment of nuclear power in Turkey. (author)

  7. Evaluation of hazards from industrial activities near nuclear power plants

    International Nuclear Information System (INIS)

    Lannoy, A.; Gobert, T.

    1980-01-01

    Among the potential hazards which could arise from industrial activity near nuclear power plants, fires and explosions of dangerous products are of particular concern. Indeed, thermal radiation from an adjacent fire could endanger the resistance of a plant's structures. Likewise, an accident explosion would induce an overpressure wave which could affect buildings' integrity. This paper presents the methodology developed by Electricite de France to evaluate the consequences of accidents affecting: - Industrial facilities: refineries, chemical and petrochemical plants, storage areas, pipelines of gaseous, liquid and liquefied materials. - Transportation routes (roads, railways, inland waterways) used to carry dangerous substances (solid explosives, liquid, gaseous or liquefied hydrocarbons). Probabilistic methods have been developed by analysis of actual accident statistics (e.g. risks induced by transportation routes) and realistic and representative accident scenarios have been set up. Five sequences have been identified: Formation of a fluid jet at a breach. Evaporation and possible formation of a liquid layer. Atmospheric dispersion and drift of a gaseous cloud. Heat radiation from fire. Unconfined explosion of a gaseous cloud. This paper gives an overview of the methods and the main assumptions used to deal with each sequence. Those methods, presently applied by Electricite de France, provide a coherent and realistic approach for the evaluation of the risks at nuclear power plants induced by industrial activity. (orig.)

  8. The problem of space nuclear power sources collisions with artificial space objects in near-earth orbits

    International Nuclear Information System (INIS)

    Gafarov, A.A.

    1993-01-01

    Practically all space objects with onboard nuclear power sources stay in earth satellite orbits with an orbital lifetime long enough to reduce their radioactivity to levels presenting no danger for the Earth population. One of the reasons for orbit lifetime reduction can be collisions with other space objects in near-earth orbits. The possible consequence of collisions can be partial, or even complete, destruction of the spacecraft with an onboard nuclear power source; as well as delivery of additional impulse both to the spacecraft and its fragments. It is shown that collisions in orbit do not cause increase of radiation hazard for the Earth population if there is aerodynamic breakup of nuclear power sources into fragments of safe sizes during atmospheric reentry

  9. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  10. Data base on dose reduction research projects for nuclear power plants. Volume 5

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Yu, C.K.; Roecklein, A.K. [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    This is the fifth volume in a series of reports that provide information on dose reduction research and health physics technology or nuclear power plants. The information is taken from two of several databases maintained by Brookhaven National Laboratory`s ALARA Center for the Nuclear Regulatory Commission. The research section of the report covers dose reduction projects that are in the experimental or developmental phase. It includes topics such as steam generator degradation, decontamination, robotics, improvements in reactor materials, and inspection techniques. The section on health physics technology discusses dose reduction efforts that are in place or in the process of being implemented at nuclear power plants. A total of 105 new or updated projects are described. All project abstracts from this report are available to nuclear industry professionals with access to a fax machine through the ACEFAX system or a computer with a modem and the proper communications software through the ACE system. Detailed descriptions of how to access all the databases electronically are in the appendices of the report.

  11. Integration of coal gasification and packed bed CLC for high efficiency and near-zero emission power generation

    NARCIS (Netherlands)

    Spallina, V.; Romano, M.C.; Chiesa, P.; Gallucci, F.; Sint Annaland, van M.; Lozza, G.

    2014-01-01

    A detailed thermodynamic analysis has been carried out of large-scale coal gasification-based power plant cycles with near zero CO2 emissions, integrated with chemical looping combustion (CLC). Syngas from coal gasification is oxidized in dynamically operated packed bed reactors (PBRs), generating a

  12. The research and development of module 3D designing system for nuclear power project based on the PDMS

    International Nuclear Information System (INIS)

    Lu Qinwu; Li Yi; Wu Xiangyong

    2012-01-01

    In order to meet the demand of implementing Modularization design in CPR1000 nuclear power projects, this study aims to develop, relying on CPR1000 nuclear power project, the self-reliant module 3D design system based on the PDMS. so as to offer a convenient and effective module 3D design tool for the designers. Satisfactory results have been achieved through the test and application of two design projects. The research and application have entered the domestic advanced level. (authors)

  13. Project finance in Eastern Europe

    International Nuclear Information System (INIS)

    Hart, R.C.

    1993-01-01

    A dysfunctional system of commercial, legal, and financial institutions is the primary problem facing the energy sectors in Eastern Europe. Generally, a major systemic transformation is well underway in the area and is already showing signs of success. The empty promise of export credit financing exerts a significant negative influence on this reform process. The discipline of project finance provides the best, if not the only, basis for financing the modernization of the Eastern European energy sector. An example is given of the Cracow Environmental Project, a modernization project. The power plant is a combined heat and power facility with 460 MW of electric capacity and 1450 MW of thermal energy capacity. Located near the center of Cracow, the plant burns hard coal and provides more than seventy percent of the central district heat consumed in the city. The scope of proposed improvements has changed from the addition of capacity to a combination of modernization and environmental retrofit of the existing plant. The total estimated cost of the improvements program is 150 million dollars. The project consists of three major elements. First, it has proposed and is in the process of restructuring the ownership of the power plant. Second, it is engaged in a major restructuring of the commercial arrangements that govern the operation of the plant. Finally, it is in the late stages of selecting an engineering, procurement, and construction consortium with which it will contract to design and make major improvements to the existing plant

  14. Kenya geothermal private power project: A prefeasibility study

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    Twenty-eight geothermal areas in Kenya were evaluated and prioritized for development. The prioritization was based on the potential size, resource temperature, level of exploration risk, location, and exploration/development costs for each geothermal area. Suswa, Eburru and Arus are found to offer the best short-term prospects for successful private power development. It was found that cost per kill developed are significantly lower for the larger (50MW) than for smaller-sized (10 or 20 NW) projects. In addition to plant size, the cost per kill developed is seen to be a function of resource temperature, generation mode (binary or flash cycle) and transmission distance.

  15. Bakun - Where should all the power go?

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Tick Hui; Chua, Shing Chyi [Faculty of Engineering and Technology, Malaysia Multimedia University (MMU), 75450 Bukit Beruang, Malacca (Malaysia); Goh, Wei Wei [Foundation Studies and Extension Education, Malaysia Multimedia University (MMU), 75450 Bukit Beruang, Malacca (Malaysia)

    2011-02-15

    Deem as one of the few mega projects of such scale in this part of the world, the largest hydroelectric dam in the Southeast Asia region, Bakun in Sarawak, is expected to complete by end of 2010. The project first initiated back in 1980s is finally near fruition more than two decades later after much controversies and obstacles. With power generation expected to start in July 2011, there are much debates on how to deal with its 2400 MW maximum capacity now that the preliminary undersea transmission cable project to transfer 1600 MW to Peninsular Malaysia is called off and all that hydropower will be contained within Sarawak. On top of that, Murum dam will add another 944 MW to the grid by end of 2013 and several other dams are reportedly afoot for construction, all within the state of Sarawak. This will result in excessive energy generation in the state while Peninsular is projected to face power shortage by 2015 with the submarine cable project scrapped. This paper presents the numerous issues related to the Bakun project that have surfaced over the years. (author)

  16. Feasibility study for Tashkent Heat and Power Plant Modernizing Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    An investigational study was carried out of the project for energy conservation and greenhouse effect gas emission reduction by introducing the newest and most powerful gas turbine cogeneration facilities to the Tashkent cogeneration plant in Uzbekistan. At the Tashkent cogeneration plant, each of the facilities is being superannuated, which leads to lowering of operational reliability and increase in cost of repairs. In the project, studied was the introduction of the newest and most powerful gas turbine cogeneration facilities with heat output of 100 Gcal/h equivalent to that of one can of the existing hot water boiler and with generated output of 80MW. As a result of the study, obtained were the energy conservation amount of 83.9 ktoe/y and the greenhouse effect gas reduction amount of 179.7 kt-CO2/y. The initial investment amount was 10.003 billion yen. Expenses vs. effects were 8.39 toe/y-million yen in energy conservation amount and 18.0 t-CO2/y-million yen in greenhouse effect gas reduction amount. In the study of profitability, the internal earning rate was 9.24% after tax, the return yield of capital was 41.26%, and the period of ROI was 16.9 years. (NEDO)

  17. Project Aether Aurora: STEM outreach near the arctic circle

    Science.gov (United States)

    Longmier, B. W.; Bering, E. A.

    2012-12-01

    Project Aether is a program designed to immerse high-school through graduate students to field research in some of the fields of STEM. The program leaders launch high altitude weather balloons in collaboration with schools and students to teach physics concepts, experimental research skills, and to make space exploration accessible to students. A weather balloon lifts a specially designed payload package that is composed of HD cameras, GPS tracking devices, and other science equipment. The payload is constructed and attached to the balloon by the students with low-cost materials. The balloon and payload are launched with FAA clearance from a site chosen based on wind patterns and predicted landing locations. The balloon ascends over 2 hours to a maximum altitude of 100,000 feet where it bursts and allows the payload to slowly descend using a built-in parachute. The balloon's location is monitored during its flight by GPS-satellite relay. Most of the science and video data are recorded on SD cards using an Arduino digitizer. The payload is located using the GPS device. The science data are recovered from the payload and shared with the students. In April 2012, Project Aether leaders conducted a field campaign near Fairbanks Alaska, sending several student-built experiments to an altitude of 30km, underneath several strong auroral displays. Auroral physics experiments that can be done on ultra small balloons (5 cubic meters) include electric field and magnetic fluctuation observations, full spectrum and narrow band optical imaging, GPS monitoring of the total electron content of the ionosphere, x-ray detection and infrared and UV spectroscopy. The actual undergraduate student experiments will be reviewed and some data presented.; Balloon deployment underneath aurora, Fairbanks Alaska, 2012.

  18. Experience of international projects implementation at Leningrad Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zavialov, L.A.

    2008-01-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  19. Experience of international projects implementation at Leningrad Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Zavialov, L.A. [Leningrad Nuclear Power Plant ' Rosenergoatom' , Leningrad Region, 188540, Sosnovy Bor (Russian Federation)

    2008-07-01

    During the period of 1992-2007 more than 60 different projects of different specificity and budget have been successfully implemented in frames of Technical Assistance for the Commonwealth of Independent States (TACIS) Program, Project financed by European Bank for Reconstruction and Development (EBRD), as well as in frames of Agreements on Cooperation between Leningrad NPP and Radiation and Nuclear safety Authority of Finland (STUK) and Swedish Nuclear Power Inspectorate, International Co-operation Program SKI-ICP(SIP). All these projects were directed to the safety increasing of the Leningrad NPP reactor, type RBMK-1000. Implementation of the technical aid projects has been performed by different foreign companies such as Aarsleff Oy, (Finland), SGN (France), Nukem (Germany), Jergo AB (Sweden), SABAROS (Switzerland), Westinghouse (USA), Nordion (Canada), Bruel and Kjer (Denmark), Data System and Solutions (UK), SVT Braundshuz (Germany) WICOTEC (Sweden), Studsvik (Sweden) and etc. which has enough technical and organizational experience in implementation of such projects, as well as all necessary certificates and licenses for works performance. Selection of a Contractor/Supplier for a joined work performance has been carried out in accordance with the tender procedure, technical specification and a planned budget. Project financing was covered by foreign Consolidated Funds and Authorities interested in increasing of Leningrad NPP safety, which have valid intergovernmental agreements with Russian Federation on the technical assistance to be provided to the NPPs. At present time all joined international projects implemented at Leningrad NPP are financed jointly with LNPP. All projects can be divided into technical aid projects connected with development and turnkey implementation of systems and complexes and projects for supply of equipment which has no analogues in Russia but successfully used all over the world. Positive experience of the joined projects

  20. Grassroots Technological Resistance: The People's Power Project and the Impossible Dream of Wireless Transmission of Energy.

    Science.gov (United States)

    Schmidt, Pete

    2017-09-01

    In 1972, the Minnesota United Power Association (UPA) teamed up with the Minnesota Cooperative Power Association (CPA) to initiate an electrification project designed to bring power from North Dakota to the Twin Cities area. A significant backlash and protest began once farmers across the state became aware of the plan and the potential impending land seizure. In the midst of these actions, one group sought to create an alternative to the power line transmission system by designing a system of wireless energy transmission based on the plans of Nikola Tesla. This self-funded conglomeration of farmers and amateur researchers formed the People's Power Project (PPP) and set about building Tesla's system for the wireless transmission of energy. Using archival documents, this paper recounts this episode and argues that, in this case, the potential for successful grassroots action was derailed by the influence of longstanding myths about Tesla and his devices. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Quality and Safety Assurance - Priority Task at Nuclear Power Projects Implementation

    International Nuclear Information System (INIS)

    Nenkova, B.; Manchev, B.; Tomov, E.

    2010-01-01

    Quality and safety assurance at implementation of nuclear power engineering projects is important and difficult task for realization. Many problems arise during this process, when many companies from different countries participate, with various kinds of activities and services provided. The scope of activities necessary for quality and safety assurance is therefore quite expanded and diverse. In order to increase the safety and reliability of Kozloduy NPP Plc (KNPP) Units 5 and 6, as well as to bring the units in conformity with the newest international requirements for quality and safety in the field of nuclear energy, a program for their modernization on the basis of different technical studies and assessments was implemented. The Units 5 and 6 Modernization Program of Kozloduy Nuclear Power Plant was composed of 212 modifications aimed to improve the safety, operability, and reliability of the Units. The Program was realized by stages during yearly planned outages since year 2002 to 2007, without additional outages. A major Program Objective was to extend the Units Life Time in at least 15 Years, under a continuous, safe, and reliable operation. The Modernization Program of Units 5 and 6 of the Bulgarian Nuclear Power Plant in Kozloduy was the first and for the time being the only one in the world, program in the field of nuclear power engineering, by which the full scope of recommendations for improvement of the Kozloduy NPP units was applied. The main goal of the National Electric Company, which is the Employer for the construction of new nuclear facility in Bulgaria, is after completion of all activities regarding construction of Belene NPP the plant to meet or exceed the requirements of the respective national and international quality and safety codes and standards, as well as the IAEA guidelines, as they are established. The objective of this report is to describe different aspects of the quality assurance according to the requirements of quality and

  2. High-energy master oscillator power amplifier with near-diffraction-limited output based on ytterbium-doped PCF fiber

    Science.gov (United States)

    Li, Rao; Qiao, Zhi; Wang, Xiaochao; Fan, Wei; Lin, Zunqi

    2017-10-01

    With the development of fiber technologies, fiber lasers are able to deliver very high power beams and high energy pulses which can be used not only in scientific researches but industrial fields (laser marking, welding,…). The key of high power fiber laser is fiber amplifier. In this paper, we present a two-level master-oscillator power amplifier system at 1053 nm based on Yb-doped photonic crystal fibers. The system is used in the front-end of high power laser facility for the amplification of nano-second pulses to meet the high-level requirements. Thanks to the high gain of the system which is over 50 dB, the pulse of more than 0.89 mJ energy with the nearly diffraction-limited beam quality has been obtained.

  3. Report of fiscal 1999 basic survey for promoting joint implementation, etc. Combined cycle power generation project for Surgut No.1 power station in the Russian Federation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper explains fiscal 1999 survey on a combined cycle power generation project for Surgut power plant in the Russian Federation for the purpose of making the project tied to the COP3 joint implementation. This power plant consists of 16 units with the total capacity of 3,300 MW. This project is to replace the existing superannuated No.1 through No.6 units with a new high-efficiency gas combined cycle power plant. The project plant is planned to comprise of three units, having the capacity of 417 MW, each consisting of one gas turbine and one steam turbine. The average generation efficiency will be improved tremendously from the present 37.2% to 55.2%. The initial investment will be 615 million in US dollars (at 109.2 yen/dollar). Energy saving will be 634,800 toe/year, with cost to effect 9,452 toe-y/million yen. Greenhouse effect gas reduction will be 1,509,000 t-CO2/year, with cost to effect 22.5 t-CO2-y/million yen. The investment recovery period is estimated to be 24 years. The Russian side strongly wishes to be granted a finance on a favorable terms and conditions to realize this project. It is possible that the Russian government requests Japan for grant of the Yen credit. Accordingly, an early start is necessary in order to deal with such request. (NEDO)

  4. Projected near-future levels of temperature and pCO2 reduce coral fertilization success.

    Directory of Open Access Journals (Sweden)

    Rebecca Albright

    Full Text Available Increases in atmospheric carbon dioxide (pCO2 are projected to contribute to a 1.1-6.4°C rise in global average surface temperatures and a 0.14-0.35 reduction in the average pH of the global surface ocean by 2100. If realized, these changes are expected to have negative consequences for reef-building corals including increased frequency and severity of coral bleaching and reduced rates of calcification and reef accretion. Much less is known regarding the independent and combined effects of temperature and pCO2 on critical early life history processes such as fertilization. Here we show that increases in temperature (+3°C and pCO2 (+400 µatm projected for this century negatively impact fertilization success of a common Indo-Pacific coral species, Acropora tenuis. While maximum fertilization did not differ among treatments, the sperm concentration required to obtain 50% of maximum fertilization increased 6- to 8- fold with the addition of a single factor (temperature or CO2 and nearly 50- fold when both factors interact. Our results indicate that near-future changes in temperature and pCO2 narrow the range of sperm concentrations that are capable of yielding high fertilization success in A. tenuis. Increased sperm limitation, in conjunction with adult population decline, may have severe consequences for coral reproductive success. Impaired sexual reproduction will further challenge corals by inhibiting population recovery and adaptation potential.

  5. Establishing the quality assurance programme for a nuclear power plant project

    International Nuclear Information System (INIS)

    1984-01-01

    This Safety Guide provides requirements, recommendations and illustrative examples for establishing the overall quality assurance programme, and its constituent programmes, for a nuclear power plant project. It also provides guidance on the planning and documenting of programme plans and actions that are intended to ensure the achievement of the appropriate quality throughout the design, procurement, manufacture, construction, commissioning, operation and decommissioning of the nuclear power plant. The provisions of this Safety Guide are applicable to all organizations performing activities affecting the quality of items important to safety, such as designing, purchasing, fabricating, manufacturing, handling, shipping, storing, cleaning, erecting, installing, testing, commissioning, operating, inspecting, maintaining, repairing, refuelling, modifying and decommissioning

  6. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  7. Dose-projection considerations for emergency conditions at nuclear power plants

    International Nuclear Information System (INIS)

    Stoetzel, G.A.; Ramsdell, J.V.; Poeton, R.W.; Powell, D.C.; Desrosiers, A.E.

    1983-05-01

    The purpose of this report is to review the problems and issues associated with making environmental radiation-dose projections during emergencies at nuclear power plants. The review is divided into three areas: source-term development, characterization of atmospheric dispersion and selection of appropriate dispersion models, and development of dosimetry calculations for determining thyroid dose and whole-body dose for ground-level and elevated releases. A discussion of uncertainties associated with these areas is also provided

  8. Dose-projection considerations for emergency conditions at nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stoetzel, G.A.; Ramsdell, J.V.; Poeton, R.W.; Powell, D.C.; Desrosiers, A.E.

    1983-05-01

    The purpose of this report is to review the problems and issues associated with making environmental radiation-dose projections during emergencies at nuclear power plants. The review is divided into three areas: source-term development, characterization of atmospheric dispersion and selection of appropriate dispersion models, and development of dosimetry calculations for determining thyroid dose and whole-body dose for ground-level and elevated releases. A discussion of uncertainties associated with these areas is also provided.

  9. Near-Field Acoustic Power Level Analysis of F31/A31 Open Rotor Model at Simulated Cruise Conditions, Technical Report II

    Science.gov (United States)

    Sree, Dave

    2015-01-01

    Near-field acoustic power level analysis of F31A31 open rotor model has been performed to determine its noise characteristics at simulated cruise flight conditions. The non-proprietary parts of the test data obtained from experiments in the 8x6 supersonic wind tunnel were provided by NASA-Glenn Research Center. The tone and broadband components of total noise have been separated from raw test data by using a new data analysis tool. Results in terms of sound pressure levels, acoustic power levels, and their variations with rotor speed, freestream Mach number, and input shaft power, with different blade-pitch setting angles at simulated cruise flight conditions, are presented and discussed. Empirical equations relating models acoustic power level and input shaft power have been developed. The near-field acoustic efficiency of the model at simulated cruise conditions is also determined. It is hoped that the results presented in this work will serve as a database for comparison and improvement of other open rotor blade designs and also for validating open rotor noise prediction codes.

  10. A Power Electronic and Drives Curriculum with Project-oriented and Problem-based Learning: A Dynamic Teaching Approach for the Future

    DEFF Research Database (Denmark)

    Blaabjerg, Frede

    2002-01-01

    extra study time. This paper present a teaching approach which makes it possible very fast for the student to get in-depth skills in this important area which is the problem-oriented and project-based learning. The trend and application of power electronics are illustrated. The necessary skills...... for power electronic engineers are outlined followed up by a discussion on how problem-oriented and project-based learning are implemented. A complete curriculum at Aalborg University is presented where different power electronics related projects at different study levels are carried out....

  11. Safety assessment methodologies and their application in development of near surface waste disposal facilities - the ASAM project

    International Nuclear Information System (INIS)

    Metcalf, P.

    2003-01-01

    The scope of ASAM project covers near surface disposal facilities for all types of low and intermediate level wastes with emphasis of the post-closure safety assessment.The objectives are to explore practical application to a range of disposal facilities for a number of purposes e.g. development of design concepts, safety re-assessment, upgrading safety and to develop practical approaches to assist regulators, operators and other experts in review of safety assessment. The task of the Co-ordination Group are: reassessment of existing facilities - use of safety assessment in decision making on selection of options (volunteer site Hungary); disused sealed sources - evaluation of disposability of disused sealed sources in near surface facilities (volunteer site Saratov, Russia); mining and minerals processing waste - evaluation of long-term safety (volunteer site pmc S. Africa). An agreement on the scope and objectives of the project are reached and the further consideration, such as human intrusion/institutional control/security; waste from oil/gas industry; very low level waste; categorization of sealed sources coordinated with other IAEA activities are outlined

  12. Air-cooling viability to increase the power in the thermal power stations of gas: Colombian case

    International Nuclear Information System (INIS)

    Amell, Andres; Bedoya, H. A

    2000-01-01

    Thermal power decreases as air temperature increases, which reduce both efficiency and projects yielding. Technologically it is possible to eliminate the environment temperature incidence on reduction of power and efficiency, cooling the input air to the turbine, obtaining important power and efficiency improvements. In this work, the technical and economical viability, when applying air cooling technologies (evaporative cooling, steam compression, and production and ice storage (TES) were studied, having in mind meteorological conditions and Colombian electric marketing features, in which, nearly 2800 MW of natural gas thermal power have been installed in the last decade. as a result of applying these cooling technologies the study determined: the mean potential of recoverable power at the second peak of the national demand curve, shows several schemes in which they are technically and economically viable in the Colombian context

  13. Strategically oriented project management of the decommissioning of nuclear power plants; Strategieorientiertes Projektmanagement der Stilllegung von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Kemmeter, Sascha [Conscore GmbH, Duesseldorf (Germany); Woempener, Andreas [Duisburg-Essen Univ., Duisburg (Germany). Lehrstuhl fuer ABWL und Controlling

    2013-12-15

    Due to the politically induced change of the energy sector in Germany, the operators of nuclear power plants had to react and to deal with completely new conditions concerning the decommissioning of their plants on short notice. Therefore the operators have to devise new strategies for controlling their decommissioning and dismantling projects in a short amount of time and most often similarly for several plants. Two fundamental procedures are possible for the successful controlling of these dismantling projects: a centralized or a decentralized management organization. How these project control processes can be realized in an optimal way, is, next to other economic specifications of the dismantling of nuclear power plants, the topic of a new research project of the Chair of Management Accounting at the University Duisburg-Essen. In that process, results and experiences from other research and practical projects concerning general large-scale projects are being used. Selected findings have been compiled and are being discussed in this paper. (orig.)

  14. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  15. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  16. Prevented Mortality and Greenhouse Gas Emissions From Historical and Projected Nuclear Power

    Science.gov (United States)

    Kharecha, Pushker A.; Hansen, James E.

    2013-01-01

    In the aftermath of the March 2011 accident at Japan's Fukushima Daiichi nuclear power plant, the future contribution of nuclear power to the global energy supply has become somewhat uncertain. Because nuclear power is an abundant, low-carbon source of base-load power, it could make a large contribution to mitigation of global climate change and air pollution. Using historical production data, we calculate that global nuclear power has prevented an average of 1.84 million air pollution-related deaths and 64 gigatonnes of CO2-equivalent (GtCO2-eq) greenhouse gas (GHG) emissions that would have resulted from fossil fuel burning. On the basis of global projection data that take into account the effects of the Fukushima accident, we find that nuclear power could additionally prevent an average of 420 000-7.04 million deaths and 80-240 GtCO2-eq emissions due to fossil fuels by midcentury, depending on which fuel it replaces. By contrast, we assess that large-scale expansion of unconstrained natural gas use would not mitigate the climate problem and would cause far more deaths than expansion of nuclear power.

  17. Near-term implications of a ban on new coal-fired power plants in the United States.

    Science.gov (United States)

    Newcomer, Adam; Apt, Jay

    2009-06-01

    Large numbers of proposed new coal power generators in the United States have been canceled, and some states have prohibited new coal power generators. We examine the effects on the U.S. electric power system of banning the construction of coal-fired electricity generators, which has been proposed as a means to reduce U.S. CO2 emissions. The model simulates load growth, resource planning, and economic dispatch of the Midwest Independent Transmission System Operator (ISO), Inc., Electric Reliability Council of Texas (ERCOT), and PJM under a ban on new coal generation and uses an economic dispatch model to calculate the resulting changes in dispatch order, CO2 emissions, and fuel use under three near-term (until 2030) future electric power sector scenarios. A national ban on new coal-fired power plants does not lead to CO2 reductions of the scale required under proposed federal legislation such as Lieberman-Warner but would greatly increase the fraction of time when natural gas sets the price of electricity, even with aggressive wind and demand response policies.

  18. HPS: A space fission power system suitable for near-term, low-cost lunar and planetary bases

    International Nuclear Information System (INIS)

    Houts, M.G.; Poston, D.I.; Ranken, W.A.

    1996-01-01

    Near-term, low-cost space fission power systems can enhance the feasibility and utility of lunar and planetary bases. One such system, the Heatpipe Power System (HPS), is described in this paper. The HPS draws on 40 yr of United States and international experience to enable a system that can be developed in <5 yr at a cost of <$100M. Total HPS mass is <600 kg at 5 kWe and <2000 kg at 50 kWe, assuming that thermoelectric power conversion is used. More advanced power conversion systems could reduce system mass significantly. System mass for planetary surface systems also may be reduced (1) if indigenous material is used for radiation shielding and (2) because of the positive effect of the gravitational field on heatpipe operation. The HPS is virtually non-radioactive at launch and is passively subcritical during all credible launch accidents. Full-system electrically heated testing is possible, and a ground nuclear power test is not needed for flight qualification. Fuel burnup limits are not reached for several decades, thus giving the system long-life potential

  19. Project of Near-Real-Time Generation of ShakeMaps and a New Hazard Map in Austria

    Science.gov (United States)

    Jia, Yan; Weginger, Stefan; Horn, Nikolaus; Hausmann, Helmut; Lenhardt, Wolfgang

    2016-04-01

    Target-orientated prevention and effective crisis management can reduce or avoid damage and save lives in case of a strong earthquake. To achieve this goal, a project for automatic generated ShakeMaps (maps of ground motion and shaking intensity) and updating the Austrian hazard map was started at ZAMG (Zentralanstalt für Meteorologie und Geodynamik) in 2015. The first goal of the project is set for a near-real-time generation of ShakeMaps following strong earthquakes in Austria to provide rapid, accurate and official information to support the governmental crisis management. Using newly developed methods and software by SHARE (Seismic Hazard Harmonization in Europe) and GEM (Global Earthquake Model), which allows a transnational analysis at European level, a new generation of Austrian hazard maps will be ultimately calculated. More information and a status of our project will be given by this presentation.

  20. Addressing the security of a future sustainable power system: The Danish SOSPO project

    DEFF Research Database (Denmark)

    Yang, Guangya; Jóhannsson, Hjörtur; Lind, Morten

    2012-01-01

    evaluated to secure the operation from both transmission and distribution levels. The Danish SOSPO project is launched from 2012 targeting at the system security assessment in the control room for the future scenarios. Methods will be developed in this project to counteract with the future challenges......Current power systems have been undergoing in depth changes by the increasing use of renewable generations. At one hand, the grid is progressively more interconnected in order to collect the renewable generation from geographically dispersed places meanwhile reduce the risks of intermittency......; on the other, the power is increasingly generated at relative low voltage networks which in turn gives rise to new challenges in the conventional system design. The high governmental objective of greenhouse gas reduction provokes accelerating adoptation of the renewables. The effect of this has to be carefully...

  1. The market for, and economics of, cogeneration and independent power projects in a competitive environment

    International Nuclear Information System (INIS)

    McLeese, R.

    1999-01-01

    A corporate review of Access Capital Corporation was presented. The company is a financial advisor for the development and ownership of electric power projects. The company has expertise in various technologies including gas-fired cogeneration, hydro energy, biomass, renewables and district heating. This presentation included a series of overhead viewgraphs which focused on: (1) the restructuring of Ontario's electricity market, (2) future private power requirements, (3) economics of IPP technologies, (4) pros and cons of on-site power generation, (5) rates paid for private power supply, and (6) financial restructuring of current NUG power purchase contracts. 2 tabs., 6 figs

  2. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  3. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and sustainability analysis

    International Nuclear Information System (INIS)

    Ringius, L.; Grohnheit, P.E.; Nielsen, L.H.; Olivier, A.L.; Painuly, J.; Villavicencio, A.

    2002-12-01

    The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment and development - that is, baseline development, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends methodologies for and approaches to baseline development. To present the application and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana, Egypt- is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between the lowest (0.5496 tCO2/MWh) and the highest emission rate (0.6868 tCO 2 /MWh) estimated in accordance with these three standardized approaches to baseline development according to the Marrakesh Accord. This difference in emission factors comes about partly as a result of including hydroelectric power in the baseline scenario. Hydroelectric resources constitute around 21% of the generation capacity in Egypt, and, if excluding hydropower, the difference between the lowest and the highest baseline is reduced to 18%. Furthermore, since the two variations of the 'historical' baseline option examined result in the highest and the lowest baselines, by disregarding this baseline option altogether the difference between the lowest and the highest is reduced to 16%. The ES3-model, which the Systems Analysis Department at Risoe National Laboratory has developed, makes it possible for this report to explore the project-specific approach to baseline development in some detail. Based on quite disaggregated data on the Egyptian electricity system, including the wind power production

  4. Technology development goals for automotive fuel cell power systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    James, B.D.; Baum, G.N.; Kuhn, I.F. Jr. [Directed Technologies, Inc., Arlington, VA (United States)

    1994-08-01

    This report determines cost and performance requirements for Proton Exchange Membrane (PEM) fuel cell vehicles carrying pure H{sub 2} fuel, to achieve parity with internal combustion engine (ICE) vehicles. A conceptual design of a near term FCEV (fuel cell electric vehicle) is presented. Complete power system weight and cost breakdowns are presented for baseline design. Near term FCEV power system weight is 6% higher than ICE system, mid-term FCEV projected weights are 29% lower than ICE`s. There are no inherently high-cost components in FCE, and at automotive production volumes, near term FCEV cost viability is closer at hand than at first thought. PEM current vs voltage performance is presented for leading PEM manufacturers and researchers. 5 current and proposed onboard hydrogen storage techniques are critically compared: pressurized gas, cryogenic liquid, combined pressurized/cryogenic, rechargeable hydride, adsorption. Battery, capacitor, and motor/controller performance is summarized. Fuel cell power system component weight and cost densities (threshold and goal) are tabulated.

  5. Baseline recommendations for greenhouse gas mitigation projects in the electric power sector

    Energy Technology Data Exchange (ETDEWEB)

    Kartha, Sivan; Lazarus, Michael [Stockholm Environment Institute/Tellus Institute, Boston, MA (United States); Bosi, Martina [International Energy Agency, Paris, 75 (France)

    2004-03-01

    The success of the Clean Development Mechanism (CDM) and other credit-based emission trading regimes depends on effective methodologies for quantifying a project's emissions reductions. The key methodological challenge lies in estimating project's counterfactual emission baseline, through balancing the need for accuracy, transparency, and practicality. Baseline standardisation (e.g. methodology, parameters and/or emission rate) can be a means to achieve these goals. This paper compares specific options for developing standardised baselines for the electricity sector - a natural starting point for baseline standardisation given the magnitude of the emissions reductions opportunities. The authors review fundamental assumptions that baseline studies have made with respect to estimating the generation sources avoided by CDM or other emission-reducing projects. Typically, studies have assumed that such projects affect either the operation of existing power plants (the operating margin) or the construction of new generation facilities (the build margin). The authors show that both effects are important to consider and thus recommend a combined margin approach for most projects, based on grid-specific data. They propose a three-category framework, according to projects' relative scale and environmental risk. (Author)

  6. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  7. Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

    Energy Technology Data Exchange (ETDEWEB)

    Jim, Nichols [Truckee Meadows Community College, Reno, NV (United States)

    2014-04-29

    The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

  8. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  9. Wind Power: How Much, How Soon, and At What Cost?

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H; Hand, Maureen

    2010-01-01

    The global wind power market has been growing at a phenomenal pace, driven by favorable policies towards renewable energy and the improving economics of wind projects. On a going forward basis, utility-scale wind power offers the potential for significant reductions in the carbon footprint of the electricity sector. Specifically, the global wind resource is vast and, though accessing this potential is not costless or lacking in barriers, wind power can be developed at scale in the near to medium term at what promises to be an acceptable cost.

  10. Teaching Power Electronics with a Design-Oriented and Project-Based Learning Method at the Technical University of Denmark

    DEFF Research Database (Denmark)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast developing technology within the electrical engineering field. This paper presents the results and experiences gained from DesignOriented Project Based Learning of switch-mode power supply design within a power electronics course at the Technical University of Denmark...... (DTU). Project-based learning (PBL) is known to be a motivating and problem-centered teaching method that not only places students at the core of the teaching and learning activities but also gives students the ability to transfer their acquired scientific knowledge into industrial practices. Students...... are asked to choose a specification from different power converter applications such as a fuel cell power conditioning converter, a light-emitting diode (LED) driver or a battery charger. Based upon their choice, the students select topology, design magnetic components, calculate input/output filters...

  11. Influencing factors of public support for modern coal-fired power plant projects: An empirical study from China

    International Nuclear Information System (INIS)

    Liu, Feng; Lyu, Tao; Pan, Li; Wang, Fei

    2017-01-01

    With the development of clean coal technology, modern coal-fired power plants have achieved the similar emission standards as gas power plants. However, due to the impressions of high pollution and high emission in traditional coal-fired power plants, such projects are often opposed by local residents, which hinder the promotion of this technology. This manuscript aims to investigate public attitudes toward these projects and to analyze the influencing mechanisms of the factors of public support. The conceptual model was built with sense of place, trust and environmental attitude as the independent variables, benefit and cost perceptions as the mediating variables and public support as the dependent variable. The model was tested and modified by structural equation modelling. The results revealed that sense of place had a slight indirect impact (−0.043) on public support through benefit perception, whereas trust had a direct impact (0.332) on public support and indirect impacts (0.298) through benefit and cost perceptions. Environmental attitude had indirect impacts on public support through benefit perception (0.180) and cost perception (−0.115). In addition, policy suggestions on decision-making, project publicity and compensation strategy are proposed to enhance public support for similar projects. - Highlights: • This manuscript aims at eliminating the NIMBY effects on modern coal-fired power plant project. • A SEM model is proposed to explore how potential factors affect public support. • Trust is the dominant influencing factor to improve public support with both direct and indirect impacts. • Environmental attitude can also have positive effect on public support through rational compensation plans.

  12. Comprehensive evaluation of power grid projects' investment benefits under the reform of transmission and distribution price

    Science.gov (United States)

    Wang, Yongli; Wang, Gang; Zuo, Yi; Fan, Lisha; Ling, Yunpeng

    2017-03-01

    On March 15, 2015, the Central Office issued the "Opinions on Further Deepening the Reform of Electric Power System" (Zhong Fa No. 9). This policy marks the central government officially opened a new round of electricity reform. As a programmatic document under the new situation to comprehensively promote the reform of the power system, No. 9 document will be approved as a separate transmission and distribution of electricity prices, which is the first task of promoting the reform of the power system. Grid tariff reform is not only the transmission and distribution price of a separate approval, more of the grid company input-output relationship and many other aspects of deep-level adjustments. Under the background of the reform of the transmission and distribution price, the main factors affecting the input-output relationship, such as the main business, electricity pricing, and investment approval, financial accounting and so on, have changed significantly. The paper designed the comprehensive evaluation index system of power grid projects' investment benefits under the reform of transmission and distribution price to improve the investment efficiency of power grid projects after the power reform in China.

  13. Fiscal 1998 research report on the total electric power loss reduction project for Myanmer; 1998 nendo Myanmer koku denryoku soshitsu sogo teigen project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of Japanese clean development mechanism, study was made on reduction of greenhouse effect gas emission from thermal power plants by reduction of power transmission and distribution losses of power systems in Myanmer. Study was made on technical power transmission and distribution losses for the national grid transmission system, 33kV sub- transmission system of Thaketa substation in Yangong city, and 6.6kV and 400V distribution systems of Latha and Lanmadaw townships in the downtown area of Yangong. Countermeasures for power loss reduction were considered on the basis of the study result. The loss reduction project plan includes a construction cost of 5,134,000US$, loss reduction of 7,726kW, and loss reduction of 33,213,000kWh. The project feasibility and profitability were evaluated by comparison between a financial internal rate of return (FIRR) and an opportunity cost assuming that a discount rate is the opportunity cost. As a result, FIRR was 17.36% and the discount rate was 8.89% in Myanmer. (NEDO)

  14. High-power AlGaN-based near-ultraviolet light-emitting diodes grown on Si(111)

    Science.gov (United States)

    Li, Zengcheng; Liu, Legong; Huang, Yingnan; Sun, Qian; Feng, Meixin; Zhou, Yu; Zhao, Hanmin; Yang, Hui

    2017-07-01

    High-power AlGaN-based 385 nm near-ultraviolet light-emitting diodes (UVA-LEDs) grown on Si(111) substrates are reported. The threading dislocation (TD) density of AlGaN was reduced by employing an Al-composition step-graded AlN/AlGaN multilayer buffer. V-shaped pits were intentionally incorporated into the active region to screen the carriers from the nonradiative recombination centers (NRCs) around the TDs and to facilitate hole injection. The light extraction efficiency was enhanced by the surface roughening of a thin-film (TF) vertical chip structure. The as-fabricated TF-UVA-LED exhibited a light output power of 960 mW at 500 mA, corresponding to an external quantum efficiency of 59.7%.

  15. Comparative analysis of methodical approaches to evaluating the efficiency of investment projects in the power industry

    International Nuclear Information System (INIS)

    Tolstooukhov, D.A.; Karkhov, A.N.

    2001-01-01

    At present time, a transition is made to market mechanisms of economy functioning based on equilibrium price formation for products of enterprises and their self-financing. Based on long-term forecasts of economic development, electric power industry should not only ensure preservation of the accumulated potential but should also provide for modernization, reconstruction, service life extension of operating power facilities and construction of new ones. Under market conditions, nuclear power installations will have to prove their right to exist and develop in competition with other power technologies. In these conditions, the responsibility is growing for the correctness of investment decisions taken in the power industry and methods on which they are based. This paper analyzes currently used calculation methods for economic efficiency of investment projects. It emphasizes the limitations and drawbacks of the existing methodical approaches, and their inconsistency with market economy and scientific and technological progress (STP). The said drawbacks lead to serious mistakes in evaluating the prospects for the development of nuclear power. The paper describes a methodical approach based on equilibrium price formation that does not have the said drawbacks and may be used as the basis for further work on creation of improved calculation methods for the economic efficiency of investment projects in nuclear power. (authors)

  16. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  17. Miniaturized Power Processing Unit Study: A Cubesat Electric Propulsion Technology Enabler Project

    Science.gov (United States)

    Ghassemieh, Shakib M.

    2014-01-01

    This study evaluates High Voltage Power Processing Unit (PPU) technology and driving requirements necessary to enable the Microfluidic Electric Propulsion technology research and development by NASA and university partners. This study provides an overview of the state of the art PPU technology with recommendations for technology demonstration projects and missions for NASA to pursue.

  18. Feasibility improvement project for the gas turbine power plant in Iran

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Investigations and discussions have been given on measures to improve energy conservation and efficiency at a power plant of Kish Water and Power Company (KWPC) in Iran. The site has high ambient temperature throughout a year, making the gas turbine power plant capable of generating power only at about 70% of the rated output, with the power generation efficiency decreasing. The project has analyzed the current situation at the plant, and evaluated different means that appear effective in improving the efficiency, including the gas turbine absorbed air cooling system, the steam injection system, and the combined cycle. As a result of the discussions, it was revealed that energy saving effect can be obtained at 145 TJ with the gas turbine absorbed air cooling system, 224 TJ with the steam injection system, and 1017 TJ with the combined cycle. The annual reduction of greenhouse gas emission due to the above energy conservation would be about 11 thousand tons, 16.5 thousand tons, and 75 thousand tons, respectively. However, the investment payback period would be about 2.45 years, 8.31 years, and 14.21 years, respectively. Therefore, the profitability does not appear very attractive because of low fuel unit cost. (NEDO)

  19. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  20. The reliability evaluation of reclaimed water reused in power plant project

    Science.gov (United States)

    Yang, Jie; Jia, Ru-sheng; Gao, Yu-lan; Wang, Wan-fen; Cao, Peng-qiang

    2017-12-01

    The reuse of reclaimed water has become one of the important measures to solve the shortage of water resources in many cities, But there is no unified way to evaluate the engineering. Concerning this issue, it took Wanneng power plant project in Huai city as a example, analyzed the reliability of wastewater reuse from the aspects of quality in reclaimed water, water quality of sewage plant, the present sewage quantity in the city and forecast of reclaimed water yield, in particular, it was necessary to make a correction to the actual operation flow rate of the sewage plant. the results showed that on the context of the fluctuation of inlet water quality, the outlet water quality of sewage treatment plants is basically stable, and it can meet the requirement of circulating cooling water, but suspended solids(SS) and total hardness in boiler water exceed the limit, and some advanced treatment should be carried out. In addition, the total sewage discharge will reach 13.91×104m3/d and 14.21×104m3/d respectively in the two planning level years of the project. They are greater than the normal collection capacity of the sewage system which is 12.0×104 m3/d, and the reclaimed water yield can reach 10.74×104m3/d, which is greater than the actual needed quantity 8.25×104m3/d of the power plant, so the wastewater reuse of this sewage plant are feasible and reliable to the power plant in view of engineering.

  1. Reanalysis of Epidemiological Investigation of Cancer Risk among People Residing near Nuclear Power Plants in South Korea.

    Science.gov (United States)

    Kim, Jeong-Min; Kim, Myoung-Hee; Ju, Young-Su; Hwang, Seung-Sik; Ha, Mina; Kim, Bong-Kyu; Zoh, Kyung Ehi; Paek, Domyung

    2018-03-09

    Background : A 20-year follow-up study on cancer incidence among people living near nuclear power plants in South Korea ended in 2011 with a finding of significantly, but inconsistently, elevated thyroid cancer risk for females. Reanalysis of the original study was carried out to examine the dose-response relationship further, and to investigate any evidence of detection bias. Methods : In addition to replicating the original Cox proportional hazards models, nested case-control analysis was carried out for all subjects and for four different birth cohorts to examine the effects of excluding participants with pre-existing cancer history at enrollment. The potential for detection bias was investigated using the records of medical utilization and voluntary health checks of comparison groups. Results : The overall risk profile of the total sample was similar to that of the original study. However, in the stratified analysis of four birth cohorts, the cancer risk among people living near nuclear power plants became higher in younger birth cohorts. This was especially true for thyroid cancers of females (hazard ratio (HR) 3.38) and males (HR 1.74), female breast cancers (HR 2.24), and radiation-related cancers (HR 1.59 for males, HR 1.77 for females), but not for radiation-insensitive cancers (HR 0.59 for males, HR 0.98 for females). Based on medical records and health check reports, we found no differences between comparison groups that could have led to detection bias. Conclusions : The overall results suggest elevated risk of radiation-related cancers among residents living near nuclear power plants, controlling for the selective survival effect. This is further supported by the lack of evidence of detection bias and by records of environmental exposure from radiation waste discharge.

  2. Reanalysis of Epidemiological Investigation of Cancer Risk among People Residing near Nuclear Power Plants in South Korea

    Directory of Open Access Journals (Sweden)

    Jeong-Min Kim

    2018-03-01

    Full Text Available Background: A 20-year follow-up study on cancer incidence among people living near nuclear power plants in South Korea ended in 2011 with a finding of significantly, but inconsistently, elevated thyroid cancer risk for females. Reanalysis of the original study was carried out to examine the dose–response relationship further, and to investigate any evidence of detection bias. Methods: In addition to replicating the original Cox proportional hazards models, nested case-control analysis was carried out for all subjects and for four different birth cohorts to examine the effects of excluding participants with pre-existing cancer history at enrollment. The potential for detection bias was investigated using the records of medical utilization and voluntary health checks of comparison groups. Results: The overall risk profile of the total sample was similar to that of the original study. However, in the stratified analysis of four birth cohorts, the cancer risk among people living near nuclear power plants became higher in younger birth cohorts. This was especially true for thyroid cancers of females (hazard ratio (HR 3.38 and males (HR 1.74, female breast cancers (HR 2.24, and radiation-related cancers (HR 1.59 for males, HR 1.77 for females, but not for radiation-insensitive cancers (HR 0.59 for males, HR 0.98 for females. Based on medical records and health check reports, we found no differences between comparison groups that could have led to detection bias. Conclusions: The overall results suggest elevated risk of radiation-related cancers among residents living near nuclear power plants, controlling for the selective survival effect. This is further supported by the lack of evidence of detection bias and by records of environmental exposure from radiation waste discharge.

  3. The Geopolitics of Power Projection in US Foreign Policy: From Colonization to Globalization

    NARCIS (Netherlands)

    Houweling, H.; Amineh, M.P.

    2003-01-01

    This Chapter studies continuity and innovation in the geopolitics of America in projecting power beyond legally recognized borders. Exporting cultural symbols expressing what America has on offer plays as crucial a role in the opening of societies beyond borders as commodity exports and the

  4. The production of soft power: practising solidarity in Brazilian South–South development projects

    DEFF Research Database (Denmark)

    Bry, Sandra

    2015-01-01

    Brazil’s development cooperation and solidarity discourse have been portrayed as soft power resources. However, few studies have analysed how Brazil implements development cooperation, and soft power theory itself suffers from a lack of empirical evidence. This article looks at the perceptions...... of participants in three Brazilian projects, particularly how soft empowerment is manifested through the demand-driven and horizontality approaches to development cooperation. I contend that these approaches have produced a positive image among the “recipients”, and I show that their perceptions of development...

  5. Third generation hybrid drive. Transmission-based integration of power electronics; Dritte Generation Hybridantrieb. Getriebenahe Integration der Leistungselektronik

    Energy Technology Data Exchange (ETDEWEB)

    Schoen, Wolfgang [ZF Friedrichshafen AG, Friedrichshafen (DE). Hybridantriebe (F und E); Lutz, Steffen [BMW AG, Muenchen (Germany); Hensler, Alexander [Technische Univ. Chemnitz (Germany); Munding, Andreas [Liebherr Elektronik GmbH, Lindau (Germany); Thoben, Markus [Infineon Technologies AG, Warstein (Germany); Zeidler, Dietmar [Kemet Electronics GmbH, Landsberg am Lech (Germany)

    2011-06-15

    The power electronics components in today's hybrid vehicles are situated at different places in the vehicle - till now far away from harsh and hot surroundings. In order to develop an integrated solution near the transmission, ZF and BMW launched the research project 'Electric components for active power transmissions' (EfA). On the basis of an eight-speed full hybrid transmission and together with Infineon, Kemet, Liebherr, and the University of Technology of Chemnitz, they are developing a power electronics unit, which facilitates doubling the power density while increasing the operating temperature. The project EfA will be concluded in June 2011. (orig.)

  6. Measurement of the sound power incident on the walls of a reverberation room with near field acoustic holography

    DEFF Research Database (Denmark)

    Jacobsen, Finn; Tiana Roig, Elisabet

    2010-01-01

    area; and it has always been regarded as impossible to measure the sound power that is incident on a wall directly. This paper examines a new method of determining this quantity from sound pressure measurements at positions on the wall using 'statistically optimised near field acoustic holography...

  7. Data base on dose reduction research projects for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Khan, T.A.; Vulin, D.S.; Liang, H.; Baum, J.W. (Brookhaven National Lab., Upton, NY (United States))

    1992-08-01

    This is the fourth volume in a series of reports that provide information on dose reduction research and health physics technology for nuclear power plants. The information is taken from a data base maintained by Brookhaven National Laboratory's ALARA Center for the Nuclear Regulatory Commission. This report presents information on 118 new or updated projects, covering a wide range of activities. Projects including steam generator degradation, decontamination, robotics, improvement in reactor materials, and inspection techniques, among others, are described in the research section of the report. The section on health physics technology includes some simple and very cost-effective projects to reduce radiation exposures. Included in this volume is a detailed description of how to access the BNL data bases which store this information. All project abstracts from this report, as well as many other useful documents, can be accessed, with permission, through our on-line system, ACE. A computer equipped with a modem, or a fax machine is all that is required to connect to ACE. Many features of ACE, including software, hardware, and communications specifics, are explained in this report.

  8. Completion of Mochovce 1 and 2 nuclear power plant project

    International Nuclear Information System (INIS)

    Valach, J.

    2000-01-01

    Commissioning of the Mochovce Nuclear Power Plant unit 2 fully completed the Mochovce unit 1 and 2 project. The power plant construction passed through a complicated evolution since early 80's. The genesis started with the change of the plant location due to a seismic resistance requirement raised by the former Czechoslovak Atomic Energy Commission, change of the design and contractor of the Instrumentation and Control system in early 90's, halt of construction in 1993 till 1996 due to a lack of funding, as well as a series of international reviews of safety aspects. All the obstacles had been overcome in the end, and completion works were re-started in 1996. Looking back to the unit 1 and 2 completion project, I would like to highlight some aspects of the project, particularly the level of safety, technical and organisational conditions, and terms of funding. The most important argument for completion of the plant was that VVER 440/213 reactor units were distinguished with very high level of passive safety, even overcoming Western-type PWR's in some aspects. The replacement of the original I and C system was another important contribution to the initial level of safety. International safety reviews performed at Mochovce NPP between 1990 and 1995 (Siemens, EdF, IAEA, RlSKAUDIT) confirmed the high level of safety of VVER 440/213 reactors, however, pointed out at some safety issues which had not been dealt with in the design. Those included e.g. the 'external risks', primary-to-secondary leaks, qualification of pressurizer safety valves, and others. It is necessary to stress that the Safety Improvement Programme defined for Mochovce NPP to comply with international standards did not become the most important part of the completion project due to external pressures, but based on natural requirements on nuclear power plant safety level generally accepted in 90's. The good example could be the seismic resistance of the plant which, though designed as seismic resistant

  9. Near-term benefits of the plant life extension program

    International Nuclear Information System (INIS)

    Kaushansky, M.M.

    1987-01-01

    The aging process can be expected to reduce the availability and increase the production costs of nuclear power plants over time. To mitigate this process and recover or enhance plant availability, capacity, thermal efficiency, and maintenance expenditures, the utility must dedicate increased attention and commitment to a comprehensive plant life extension (PLEX) program. Improvements must be justified by balancing the cost of the recommended modifications with the economic value of benefits obtained from its implementation. It is often extremely difficult for utility management to make an optimal selection from among hundreds of proposed projects, most of which are cost-effective. A properly structured PLEX program with an emphasis on near-term benefits should provide the utility with a means of evaluating proposed projects, thus determining the optimum combination for authorization and implementation

  10. Safety cases for the co-ordinated research project on improvement of safety assessment methodologies for near surface radioactive waste disposal facilities (ISAM)

    International Nuclear Information System (INIS)

    Kozak, M.W.; Torres-Vidal, C.; Kelly, E.; Guskov, A.; Blerk, J. van

    2002-01-01

    A Co-ordinated Research Project (CRP) has recently been completed on the Improvement of Safety Assessment Methodologies for Near-Surface Radioactive Waste Disposal Facilities (ISAM). A major aspect of the project was the use of safety cases for the practical application of safety assessment. An overview of the ISAM safety cases is given in this paper. (author)

  11. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  12. Study on the near-field non-linearity (SMILE) of high power diode laser arrays

    Science.gov (United States)

    Zhang, Hongyou; Jia, Yangtao; Li, Changxuan; Zah, Chung-en; Liu, Xingsheng

    2018-02-01

    High power laser diodes have been found a wide range of industrial, space, medical applications, characterized by high conversion efficiency, small size, light weight and a long lifetime. However, due to thermal induced stress, each emitter in a semiconductor laser bar or array is displaced along p-n junction, resulting of each emitter is not in a line, called Near-field Non-linearity. Near-field Non-linearity along laser bar (also known as "SMILE") determines the outcome of optical coupling and beam shaping [1]. The SMILE of a laser array is the main obstacle to obtain good optical coupling efficiency and beam shaping from a laser array. Larger SMILE value causes a larger divergence angle and a wider line after collimation and focusing, respectively. In this letter, we simulate two different package structures based on MCC (Micro Channel Cooler) with Indium and AuSn solders, including the distribution of normal stress and the SMILE value. According to the theoretical results, we found the distribution of normal stress on laser bar shows the largest in the middle and drops rapidly near both ends. At last, we did another experiment to prove that the SMILE value of a laser bar was mainly affected by the die bonding process, rather than the operating condition.

  13. Stochastic Drought Risk Analysis and Projection Methods For Thermoelectric Power Systems

    Science.gov (United States)

    Bekera, Behailu Belamo

    Combined effects of socio-economic, environmental, technological and political factors impact fresh cooling water availability, which is among the most important elements of thermoelectric power plant site selection and evaluation criteria. With increased variability and changes in hydrologic statistical stationarity, one concern is the increased occurrence of extreme drought events that may be attributable to climatic changes. As hydrological systems are altered, operators of thermoelectric power plants need to ensure a reliable supply of water for cooling and generation requirements. The effects of climate change are expected to influence hydrological systems at multiple scales, possibly leading to reduced efficiency of thermoelectric power plants. This study models and analyzes drought characteristics from a thermoelectric systems operational and regulation perspective. A systematic approach to characterize a stream environment in relation to extreme drought occurrence, duration and deficit-volume is proposed and demonstrated. More specifically, the objective of this research is to propose a stochastic water supply risk analysis and projection methods from thermoelectric power systems operation and management perspectives. The study defines thermoelectric drought as a shortage of cooling water due to stressed supply or beyond operable water temperature limits for an extended period of time requiring power plants to reduce production or completely shut down. It presents a thermoelectric drought risk characterization framework that considers heat content and water quantity facets of adequate water availability for uninterrupted operation of such plants and safety of its surroundings. In addition, it outlines mechanisms to identify rate of occurrences of the said droughts and stochastically quantify subsequent potential losses to the sector. This mechanism is enabled through a model based on compound Nonhomogeneous Poisson Process. This study also demonstrates how

  14. Frictional power dissipation on plate boundary faults: Implications for coseismic slip propagation at near-surface depths

    Science.gov (United States)

    Ikari, M.; Kopf, A.; Saffer, D. M.; Marone, C.; Carpenter, B. M.

    2013-12-01

    The general lack of earthquake slip at shallow (behavior associated with laboratory observations that disaggregated fault gouges commonly strengthen with increasing sliding velocity (i.e. velocity-strengthening friction), which precludes strain energy release via stress drops. However, the 2011 Tohoku earthquake demonstrated that coseismic rupture and slip can sometimes propagate to the surface in subduction zones. Surface rupture is also known to occur on other plate boundary faults, such as the Alpine Fault in New Zealand. It is uncertain how the extent of coseismic slip propagation from depth is controlled by the frictional properties of the near-surface portion of major faults. In these situations, it is common for slip to localize within gouge having a significant component of clay minerals, which laboratory experiments have shown are generally weak and velocity strengthening. However, low overall fault strength should facilitate coseismic slip, while velocity-strengthening behavior would resist it. In order to investigate how frictional properties may control the extent of coseismic slip propagation at shallow depths, we compare frictional strength and velocity-dependence measurements using samples from three subduction zones known for hosting large magnitude earthquakes. We focus on samples recovered during scientific drilling projects from the Nankai Trough, Japan, the Japan Trench in the region of the Tohoku earthquake, and the Middle America Trench, offshore Costa Rica; however we also include comparisons with other major fault zones sampled by drilling. In order to incorporate the combined effects of overall frictional strength and friction velocity-dependence, we estimate shear strength as a function of slip velocity (at constant effective normal stress), and integrate this function to obtain the areal power density, or frictional power dissipation capability of the fault zone. We also explore the role of absolute shear stress level before arrival of a

  15. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  16. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  17. Project of a Near-Real-Time Sismo-acoustic Submarine Station for offshore monitoring (NRTSSS)

    Science.gov (United States)

    D'Anna, G.; Calore, D.; Mangano, G.; D'Alessandro, A.; Favali, P.

    2011-12-01

    The INGV seismic network ensures reliable and continuous monitoring of the Italian territory. However, the peculiarity of the Italian peninsula, characterised by an intense offshore geodynamic and seismic activity, requires the extension of the seismic monitoring to the sea. The aim of this project is: - to identify bottleneck is related to the construction, installation and use of underwater seismic station; - to define the most appropriate and low-cost architecture to guarantee the minimum functionality required for a seismic station. In order to obtain reliable seafloor seismic signals integrated to land-based network, the requirements to be fulfill are: - an acceptable coupling with the seabed; - the orientation of the components with respect to the magnetic North and to the verticality; - the correct time stamp of the data; - the data transfer to the land for the integration. Currently, the optimal solution for offshore seismic station is a cable connection to power and real-time data transfer, like the case of Western Ionian Sea cabled observatory, one of the operative node of the EMSO research infrastructure (European Multidisciplinary Seafloor and water column Observatory, http://emso-eu.org). But in the Mediterranean many seismic areas are located a few tens-hundreds of miles from the coast and cabled solutions are not feasible essentially for economic reasons. For this kind of installations EMSO research infrastructure foresees no-cabled solution, that requires a surface buoy deployed in the vicinity seafloor modules.This project plans to develop a surface buoy equipped with autonomous power supply system to power also the seafloor platforms and two-way communication system enabling the data transfer through latest generation of broadband radio communication or satellite link (Fig. 1). All the components of the prototype system are described.

  18. Reviewing nuclear power

    International Nuclear Information System (INIS)

    Robinson, Colin

    1990-01-01

    The UK government has proposed a review of the prospects for nuclear power as the Sizewell B pressurized water reactor project nears completion in 1994. However, a delay in the completion of Sizewell B or a change of government could put off the review for some years beyond the mid 1990s. Anticipating, though, that such a review will eventually take place, issues which it should consider are addressed. Three broad categories of possible benefit claimed for nuclear power are examined. These are that nuclear power contributes to the security of energy supply, that it provides protection against long run fossil fuel price increases and that it is a means of mitigating the greenhouse effect. Arguments are presented which cost doubt over the reality of these benefits. Even if these benefits could be demonstrated, they would have to be set against the financial, health and accident costs attendant on nuclear power. It is concluded that the case may be made that nuclear power imposes net costs on society that are not justified by the net benefits conferred. Some comments are made on how a government review, if and when it takes place, should be conducted. (UK)

  19. Project approach study for nuclear power plants in the Netherlands

    International Nuclear Information System (INIS)

    1985-11-01

    The new nuclear program in the Netherlands comprises the construction of two to four nuclear power plants up to the year 2000. The main objective pursued with the implementation of the nuclear program is the supply of low-cost electricity in the future. In order to prepare the program and to provide a basis for further decisions, the Ministry of Economic Affairs has entrusted Motor-Columbus Consulting Engineers Inc., Baden, Switzerland, with a study to determine the most suitable project approach option(s) for the implementation of the future nuclear program in the Netherlands. In carrying out this study, Motor-Columbus investigated the following main project approach options: 1. turnkey contract approach; 2. split-package contract approach; 3. multi-contract approach. It is concluded that if applied in the appropriate way, the normal turnkey contract approach represents the most suitable approach under the prevailing situation in the Netherlands. (orig.)

  20. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)